WorldWideScience

Sample records for support construction management

  1. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  2. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  3. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  4. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  5. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  6. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  7. Constructing counterproductive behavior for supporting evironmental management system research

    Science.gov (United States)

    Tiarapuspa; Indyastuti, D. L.; Sari, W. R.

    2018-01-01

    This study aims to explore the definition of counterproductive behavior based on supervisors’ and sub ordinaries’ perceptions. Recently, environmental management system is a strategic tool to gain a competitive advantage. Human resource is the vital factor for successful environmental management system. Counterproductive behavior will destroy environmental management system. Unfortunately, the construct of counterproductive behavior is still debatable. Different culture show different dimensions and indicators of counterproductive behavior. The unclear construct results ambiguous empirical evidence. This study results that many items are included of counterproductive behavior, such as come late, impolite communication, playing gadget in working time, and the other negative behaviors.

  8. Prototype Development of an ICT System to Support Construction Management Based on Virtual Models and RFID

    DEFF Research Database (Denmark)

    Sørensen, Kristian Birch; Christiansson, Per; Svidt, Kjeld

    2009-01-01

    early example) of an ICT system was carried out to identify and formalise user needs in relation to construction management based on virtual models and radio frequency identification (RFID). The prototype was developed to support working processes in real-time project progress management, quality...

  9. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    Science.gov (United States)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  10. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  11. Construction Management for Conventional Facilities of Proton Accelerator

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Cho, Jin Sam; Lee, Jae Sang

    2008-05-01

    Proton Engineering Frontier Project, puts its aim to building 100MeV 20mA linear proton accelerator which is national facility for NT, BT, IT, and future technologies, expected to boost up the national industry competitiveness. This R and D, Construction Management is in charge of the supportive works as site selection, architecture and engineering of conventional facilities, and overall construction management. The major goals of this work are as follows: At first, architecture and engineering of conventional facilities. Second, construction management, audit and inspection on construction of conventional facilities. Lastly, cooperation with the project host organization for adjusting technical issues of overall construction. In this research, We reviewed the basic design and made a detail design of conventional facilities. Preparation for construction license, site improvement and access road construction is fulfilled. Also, we made the technical support for project host as follows : selection of project host organization and host site selection, construction technical work for project host organization and procedure management

  12. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  13. Resource management for sustainable development : The application of a methodology to support resource management for the adequate application of Construction Systems to enhance sustainability in the lower income dwelling construction industry in Costa Rica

    NARCIS (Netherlands)

    Egmond - de Wilde De Ligny, van E.L.C.; Erkelens, P.A.; Jonge, de S.; Vliet, van A.A.M.

    2000-01-01

    This paper describes the results of the application of a methodology to support resource management for the enhancement of sustainability in the construction industry. Particular emphasis is given to the sustainability of manufacturing and application of construction systems for low income housing

  14. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  15. Considering Materials Management in Construction: An Exploratory Study

    Directory of Open Access Journals (Sweden)

    Zakaria Dakhli

    2018-03-01

    Full Text Available While materials count for a considerable amount of construction costs, the way materials are managed seems to be improvised rather than approached methodically. This study investigates the practice of novel techniques used to manage materials in the construction industry. Techniques that have already proven themselves to be efficient ways to manage the production pace within the industry include the pull system, Just-In-Time, Kitting and off-site fabrication. These are explained and assessed in the context of the French construction industry through an exploratory study, supported by a questionnaire completed by contractors. The results reveal that a clear plan to manage materials on-site is lacking among the respondents, creating common inventory problems. This research provides evidence to support the central role played by an efficient management of material flow on-site. It also highlights the obstacles that hinder the adoption of innovative techniques, such as sub-contractor coordination.

  16. Innovative quality management practices in the Dutch construction industry

    NARCIS (Netherlands)

    Bossink, B.A.G.

    2002-01-01

    Quality management practices do support the management of strategically important innoυation processes. This conclusion is based on empirical research in the Dutch construction industry. A large-scale innovative construction project is intensively studied during a three-year period. The quality

  17. A Construction Management Framework for Mass Customisation in Traditional Construction

    Directory of Open Access Journals (Sweden)

    María Dolores Andújar-Montoya

    2015-04-01

    Full Text Available A Mass Customisation model is discussed as a competitive positioning strategy in the marketplace adding value to the customer’s end-use. It includes the user as part of the construction process responding to the customer’s demands and wishes. To the present day, almost all proposals for Mass Customisation have been focused on the design phase and single family houses. The reality is that the processes carried out in the work execution are so inefficient that the costs of the Mass Customisation models are assumed by the customer and they do not offer solutions that support the change management. Furthermore, this inefficiency often makes Mass Customisation unfeasible in terms of deadlines and site management. Therefore, the present proposal focuses on achieving the paradigm of Mass Customisation in the traditional residential construction complementary to the existing proposals in the design phase. All this through the proposal of a framework for the integral management in the work execution, which will address change management introduced by the users offering an efficient and productive model that reduces costs in the process. This model will focus on the synergy between different strategies, techniques and technologies currently used in the construction management (such as Lean Construction or Six Sigma, together with, other strategies and technologies that have proven to be valid solutions in other fields (such as Business Process Management, Service Oriented Architecture, etc..

  18. Construction Management.

    Science.gov (United States)

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  19. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  20. Management of construction and demolition wastes as secondary building resources

    Science.gov (United States)

    Manukhina, Lyubov; Ivanova, Irina

    2017-10-01

    The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.

  1. Construction managers' perceptions of construction safety practices in small and large firms: a qualitative investigation.

    Science.gov (United States)

    Gillen, Marion; Kools, Susan; McCall, Cade; Sum, Juliann; Moulden, Kelli

    2004-01-01

    Despite the institution of explicit safety practices in construction, there continue to be exceedingly high rates of morbidity and mortality from work-related injury. This study's purpose was to identify, compare and contrast views of construction managers from large and small firms regarding construction safety practices. A complementary analysis was conducted with construction workers. A semi-structured interview guide was used to elicit information from construction managers (n = 22) in a series of focus groups. Questions were designed to obtain information on direct safety practices and indirect practices such as communication style, attitude, expectations, and unspoken messages. Data were analyzed using thematic content analysis. Managers identified a broad commitment to safety, worker training, a changing workplace culture, and uniform enforcement as key constructs in maintaining safe worksites. Findings indicate that successful managers need to be involved, principled, flexible, and innovative. Best practices, as well as unsuccessful injury prevention programs, were discussed in detail. Obstacles to consistent safety practice include poor training, production schedules and financial constraints. Construction managers play a pivotal role in the definition and implementation of safety practices in the workplace. In order to succeed in this role, they require a wide variety of management skills, upper management support, and tools that will help them instill and maintain a positive safety culture. Developing and expanding management skills of construction managers may assist them in dealing with the complexity of the construction work environment, as well as providing them with the tools necessary to decrease work-related injuries.

  2. Construction Management for Conventional Facilities of Proton Accelerator

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Cho, Jang Hyung; Cho, Sung Won

    2013-01-01

    Proton Engineering Frontier Project, puts its aim to building 100MeV 20mA linear proton accelerator which is national facility for NT, BT, IT, and future technologies, expected to boost up the national industry competitiveness. This R and D, Construction Management is in charge of the supportive works such as site selection, architecture and engineering of conventional facilities, and overall construction management. The major goals of this work are as follows: At first, architecture and engineering of conventional facilities. Second, construction management, supervision and inspection on construction of conventional facilities. Lastly, cooperation with the project host organization, Gyeongju city, for adjusting technically interrelated work during construction. In this research, We completed the basic, detail, and field changed design of conventional facilities. Acquisition of necessary construction and atomic license, radiation safety analysis, site improvement, access road construction were successfully done as well. Also, we participated in the project host related work as follows: Project host organization and site selection, construction technical work for project host organization and procedure management, etc. Consequently, we so fulfilled all of the own goals which were set up in the beginning of this construction project that we could made contribution for installing and running PEFP's developed 100MeV 20mA linear accelerator

  3. Document management in engineering construction

    International Nuclear Information System (INIS)

    Liao Bing

    2008-01-01

    Document management is one important part of systematic quality management, which is one of the key factors to ensure the construction quality. In the engineering construction, quality management and document management shall interwork all the time, to ensure the construction quality. Quality management ensures that the document is correctly generated and adopted, and thus the completeness, accuracy and systematicness of the document satisfy the filing requirements. Document management ensures that the document is correctly transferred during the construction, and various testimonies such as files and records are kept for the engineering construction and its quality management. This paper addresses the document management in the engineering construction based on the interwork of the quality management and document management. (author)

  4. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  5. Repository construction management and quality assurance

    International Nuclear Information System (INIS)

    Hood, F.C.

    1984-01-01

    An emphasis on preventive rather than reactive management is key to an efficient construction management operation. Development of contingency plans to deal with unexpected adverse conditions, e.g., brine pockets during mining operations, are an integral part of the management program to ensure project safety, quality, cost, schedule and environmental objectives are met. A viable quality assurance program with active management support will optimize management effectiveness in reaching project goals. With adequate planning and perceptive application of the proper management controls, Quality Assurance becomes an essential ingredient for efficiently managing a job because it has been built into the management system rather than being an uninvolved peripheral entity. 6 references, 3 figures

  6. Construction quality management principles and good practice

    CERN Document Server

    Watson, Paul

    2011-01-01

    Quality management is essential for facilitating the competitiveness of modern day commercial organizations. Excellence in quality management is a requisite for construction organizations who seek to remain competitive and successful. The challenges presented by competitive construction markets and large projects that are dynamic and complex necessitate the adoption and application of quality management approaches. This textbook is written in line with the ISO 9001:2008 standard and provides a comprehensive evaluation of quality management systems and tools. Their effectiveness in achieving project objectives is explored, as well as applications in corporate performance enhancement. Both the strategic and operational dimensions of quality assurance are addressed by focusing on providing models of best practice. The reader is supported throughout by concise and clear explanations and with self-assessment questions. Practical case study examples show how various evaluative-based quality management systems and t...

  7. A BIM-based approach to reusing construction firm’s management information

    OpenAIRE

    Zhiliang Ma

    2012-01-01

    Nowadays most construction firms have begun to use information management systems in their business to work more efficiently. At the same time, a lot of management information is being accumulated and some of the information can be reused to support the decision-making. Up to now, the information has not been reused so effectively in construction firms as expected. This paper introduces a new approach to reusing construction firm’s management information, which is based on BIM (Building Inf...

  8. Portfolio management for investment projects in the construction industry

    Directory of Open Access Journals (Sweden)

    Kozlov Alexander

    2017-01-01

    Full Text Available The Russian business community has realized the need for project/targeted programme management procedures; therefore, the demand for customized project-oriented management methods goes up. In the meantime, this demand is not supplied in full, and the supply is far from being efficient. Project management methodologies need further improvement, including development of portfolio management processes applicable to investment projects developed and implemented in the construction industry. The article considers General approaches to the formalization of the management of portfolios of investment–construction projects. For the main groups of processes portfolio management (“Formation and alignment”, “Monitoring and control” and “Support and development” deals with their constituent sub-processes. The proposed decomposition can be used for both portfolio construction and investment projects and also has an invariant character, which allows extending the proposed approaches to other system target–oriented and project–oriented management.

  9. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  10. A web-based Decision Support System for the optimal management of construction and demolition waste.

    Science.gov (United States)

    Banias, G; Achillas, Ch; Vlachokostas, Ch; Moussiopoulos, N; Papaioannou, I

    2011-12-01

    Wastes from construction activities constitute nowadays the largest by quantity fraction of solid wastes in urban areas. In addition, it is widely accepted that the particular waste stream contains hazardous materials, such as insulating materials, plastic frames of doors, windows, etc. Their uncontrolled disposal result to long-term pollution costs, resource overuse and wasted energy. Within the framework of the DEWAM project, a web-based Decision Support System (DSS) application - namely DeconRCM - has been developed, aiming towards the identification of the optimal construction and demolition waste (CDW) management strategy that minimises end-of-life costs and maximises the recovery of salvaged building materials. This paper addresses both technical and functional structure of the developed web-based application. The web-based DSS provides an accurate estimation of the generated CDW quantities of twenty-one different waste streams (e.g. concrete, bricks, glass, etc.) for four different types of buildings (residential, office, commercial and industrial). With the use of mathematical programming, the DeconRCM provides also the user with the optimal end-of-life management alternative, taking into consideration both economic and environmental criteria. The DSS's capabilities are illustrated through a real world case study of a typical five floor apartment building in Thessaloniki, Greece. Copyright © 2011 Elsevier Ltd. All rights reserved.

  11. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  12. A Framework For A Decision Support Model For Supply Chain Management In The Construction Industry

    OpenAIRE

    Perdomo-Rivera, Jose Luis

    2004-01-01

    Materials are one of the areas that require special attention while creating a project's master plan as well as during the daily construction progress. The absence of materials when needed is one of the main causes of loss of productivity at a jobsite. Inefficient materials management can lead to an increase of 50% in work hours. As a result, a detailed plan for the materials management of each construction project is necessary. The critical role of materials management in the su...

  13. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  14. Constructing a management strategy for contaminated agricultural systems using the decision support system RODOS and GIS technology

    International Nuclear Information System (INIS)

    Montero, Milagros; Dvorzhak, Alla

    2008-01-01

    Full text: In the event of a radiological accident or incident, the construction of a strategy for managing the possible contaminated systems is an important component into the emergency response process. There are a wide collection of possible management options, but for any one accident scenario only a subset of options conforming a management strategy will be applied. The selection of these options depends on a wide range of criteria (time and space, effectiveness, economic cost, radiological and environmental impact, waste disposal, legislative issues and societal and ethical aspects, for example) which, nowadays, are implemented into tools and systems to guide to the decision-makers. This work aims to establish the usefulness and applicability of the Decision Support System RODOS for representative Spanish situations where food production systems become contaminated after a radiological emergency. This aspect is demonstrated for developing an management strategy for one scenario involving contamination of the food chain after a hypothetical accidental release of 137 Cs and 90 Sr from a Spanish NPP. For this scenario, the NWP (Numerical Weather Prediction) data of INM (National Meteorological Institute) have been considered. The deposited contamination, the activity concentration in significant agricultural products for this region, human doses and countermeasures proposed by the RODOS system have been considered and analyzed. There could be defined a ranking of the information intended for the decision makers based on the importance of the decisions to be made from it in each phase of the accident. In the initial moments, there is no detailed radiological information, and urgent countermeasures must be taken promptly to be effective. In regard to the information in which decision is supported during subsequent phases of the accident (late phase), time scheduling is not limiting, being the key requirement to count on the most reliable and complete information

  15. Decision problems in management of construction projects

    Science.gov (United States)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  16. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  17. Construction Management Meets Today's Realities.

    Science.gov (United States)

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  18. Workshop presentation: research guidelines for Construction Management

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1 Construction management: tools and methods to manage construction projects 2 environmental impact of construction projects 3 construction management and safety 4 project procurement 5 construction management for major public works & complex projects

  19. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  20. Construction Management--Exploding Some Myths.

    Science.gov (United States)

    Kluenker, Charles

    1986-01-01

    Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)

  1. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  2. Workshop presentation: research guidelines for Construction Management

    OpenAIRE

    Marco Alvise Bragadin

    2013-01-01

    Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1) Construction management: tools and methods to manage construction projects 2) environmental impact of construction projects 3) construction management and safety 4) project p...

  3. A theory of construction management?

    Directory of Open Access Journals (Sweden)

    Gerard de Valence

    2012-09-01

    Full Text Available The links between theory and construction management (CM, and for that matter construction economics (CE, are not strong (see de Valence 2011. This may be one of the reasons why they have not gained complete acceptance as academic disciplines and are not seen as distinct branches of economics and management respectively. Another reason may be that products and production (the focus of management and economic theories respectively are not the same as projects and project management in general, and construction projects and CM in particular.

  4. Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system

    International Nuclear Information System (INIS)

    Trinh Dinh Hai; Nguyen Thanh Cuong; Huynh Ton Nghiem; Phan Quoc Minh; Nguyen Duc Tuan; Nguyen Nhi Dien

    2004-01-01

    From 1/2002 to 12/2003, we implemented successfully a project, entitled 'Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system' under the assistance of the Ministry of Science and Technology. Its main results such as Testing Apparatus based on microcontroller for all functional boards of the Control Logic System of the Reactor Control System (RCS). Technical support CD - ROM for Process Instrumentation System, software for logging automatically information from important systems of the RCS through LAN, program for failure management of Process Instrumentation System have been playing an important role for observation, operation support, maintenance of the RCS. Through this project, the implementation group has grown up rapidly. The control and instrumentation group has been provided with some modern equipment, electronic components, and materials for maintenance work and research development in the years to come. This paper presents typical results and discussions. (author)

  5. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  6. A BIM-based approach to reusing construction firm’s management information

    Directory of Open Access Journals (Sweden)

    Zhiliang Ma

    2012-12-01

    Full Text Available Nowadays most construction firms have begun to use information management systems in their business to work more efficiently. At the same time, a lot of management information is being accumulated and some of the information can be reused to support the decision-making. Up to now, the information has not been reused so effectively in construction firms as expected. This paper introduces a new approach to reusing construction firm’s management information, which is based on BIM (Building Information Modeling technology. In the paper, the current approaches are reviewed at first, and then the framework of the new approach is described. Next, the key issues of the new approach are clarified. Finally, a use case of the new approach is demonstrated. It is concluded that the new approach can be used in construction firms to better reuse the accumulated management information.

  7. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  8. Human Factors Simulation in Construction Management Education

    Science.gov (United States)

    Jaeger, M.; Adair, D.

    2010-01-01

    Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management…

  9. Conceptual Model for Systematic Construction Waste Management

    OpenAIRE

    Abd Rahim Mohd Hilmi Izwan; Kasim Narimah

    2017-01-01

    Development of the construction industry generated construction waste which can contribute towards environmental issues. Weaknesses of compliance in construction waste management especially in construction site have also contributed to the big issues of waste generated in landfills and illegal dumping area. This gives sign that construction projects are needed a systematic construction waste management. To date, a comprehensive criteria of construction waste management, particularly for const...

  10. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  11. BIM for Construction Site Logistics Management

    Directory of Open Access Journals (Sweden)

    K. Whitlock

    2018-01-01

    Full Text Available Emerging Building Information Modelling (BIM has been hailed as a revolutionary technology and information management process that facilitates collaboration and more efficient design and construction processes through innovative 3D modelling software, open access to information and multidisciplinary integration. The deadline of compliance to BIM level 2 on all public sector centrally procured construction projects has expired leaving many construction firms anxious to adopt BIM. Most common documented applications of BIM have been in the areas of architectural and structural design, quantity surveying, construction project management, and sustainability with very limited peer-reviewed studies on construction logistics management. The aim of this study is to investigate how BIM can be applied to construction logistics management. This study adopts a desk-top approach, with articles sources from renowned scientific databases such as ScienceDirect, Google Scholar and Emerald. The study culminated in the identification of benefits and barriers of adopting BIM for construction logistics management. Given only a desk-top approach has been used, the recommendation for future study is to build on this to conduct an empirical study using both qualitative and quantitative data. This will provide an in-depth understanding of the use of BIM for construction logistics management and open opportunities for further research.

  12. Constructing collaboration and management platform with spring+ hibernate

    International Nuclear Information System (INIS)

    Zhang Hongmei; Ou Ge; Nie Jianyin; Song Liming; Chen Gang

    2007-01-01

    HCMP is the platform of collaboration and management for HXMT. The documents of HXMT project are the main context of HCMP. Besides the users of HXMT project, HCMP also serves other users. HCMP adopts the hierarchy Web structure to implement context release, documents approval, project management and portal website. HCMP provides the support of informatlization and standardization for HXMT project. This paper adopts Spring + Hibernate technique to construct the J2EE architecture, based on which HCMP is implemented. (authors)

  13. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  14. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  15. Financial management of the construction company

    Directory of Open Access Journals (Sweden)

    Antosova, Karolina

    2016-12-01

    Full Text Available This paper informs about the financial management in the construction company. The work describes problems of the management, its tasks, goals, dependencies on the size of the construction company and progress in the construction production and also introduce topic of the risks in the construction business. Also controlling and reporting in the construction company together with basic tools are described in example of Metrostav a.s. in this work.

  16. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  17. Development, content validity, and piloting of an instrument designed to measure managers' attitude toward workplace breastfeeding support.

    Science.gov (United States)

    Chow, Tan; Wolfe, Edward W; Olson, Beth H

    2012-07-01

    Manager attitude is influential in female employees' perceptions of workplace breastfeeding support. Currently, no instrument is available to assess manager attitude toward supporting women who wish to combine breastfeeding with work. We developed and piloted an instrument to measure manager attitudes toward workplace breastfeeding support entitled the "Managers' Attitude Toward Breastfeeding Support Questionnaire," an instrument that measures four constructs using 60 items that are rated agree/disagree on a 4-point Likert rating scale. We established the content validity of the Managers' Attitude Toward Breastfeeding Support Questionnaire measures through expert content review (n=22), expert assessment of item fit (n=11), and cognitive interviews (n=8). Data were collected from a purposive sample of 185 front-line managers who had experience supervising female employees, and responses were scaled using the Multidimensional Random Coefficients Multinomial Logit Model. Dimensionality analyses supported the proposed four-construct model. Reliability ranged from 0.75 to 0.86, and correlations between the constructs were moderately strong (0.47 to 0.71). Four items in two constructs exhibited model-to-data misfit and/or a low score-measure correlation. One item was revised and the other three items were retained in the Managers' Attitude Toward Breastfeeding Support Questionnaire. Findings of this study suggest that the Managers' Attitude Toward Breastfeeding Support Questionnaire measures are reliable and valid indicators of manager attitude toward workplace breastfeeding support, and future research should be conducted to establish external validity. The Managers' Attitude Toward Breastfeeding Support Questionnaire could be used to collect data in a standardized manner within and across companies to measure and compare manager attitudes toward supporting breastfeeding. Organizations can subsequently develop targeted strategies to improve support for breastfeeding

  18. On how to do construction management communications engineering

    Institute of Scientific and Technical Information of China (English)

    Zhang Zhi

    2014-01-01

    In the communication construction projects, improving the efectivenes of project management is an important part of the quality asurance program. The efectivenes of the communication and construction project management is afected by many factors. Therefore, the discusion of communication construction project management efectivenes is good for improving the quality of projects of great significance. This paper analyzes the characteristics and problems of communication construction projects, reflecting the importance of project management; then discused the factors afecting the efectivenes of project management; finaly targeted to improve the communication of construction project management efectivenes propose specific methods to ensure communication quality of construction projects.

  19. Application of Total Quality Management (TQM Requirements in Risk Management in Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Entisar K. Al-Geelawee

    2016-06-01

    Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

  20. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  1. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  2. Construction Cost Management in Resource Based Economy

    OpenAIRE

    Elazzazy, Muhammad

    2017-01-01

    Resource Based Economy tested according to criteria formulated from the construction cost management best practices. A cost management plan modeled to demonstrate the possibility of construction management under a new socio-economic system, which counts the consumed natural resources by construction as the dry cost to the environment.

  3. Operations Management on The Construction Site

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...

  4. Group affiliation in self-management: support or threat to identity?

    Science.gov (United States)

    Bossy, Dagmara; Knutsen, Ingrid Ruud; Rogers, Anne; Foss, Christina

    2017-02-01

    Self-management is considered important in chronic illness, and contemporary health policy recommends participation in support groups for individuals with chronic conditions. Although withdrawal from or non-participation in support groups is an important problem, there is limited knowledge about individuals' own motivation for participation in or withdrawal from self-management support groups. To investigate how individuals with type 2 diabetes perceive participation in group-based self-management support. This is a qualitative focus group study using a semi-structured interview guide. Sixteen participants diagnosed with type 2 diabetes were included in the study. Individuals with and without group affiliations were mixed in three focus groups to trigger discussions. In the analysis, reoccurring themes of engagement and discussions between participants were focused within a theoretical frame of institutional logic. The focus groups are seen as social spaces where participants construct identity. Both participation and non-participation in group-based self-management support are associated with dealing with the stigma of having type 2 diabetes. Negotiations contribute to constructing an illness dignity as a response to the logic of moral responsibility for the disease. Contemporary policy contributes to societal understandings of individuals with type 2 diabetes as morally inadequate. Our study shows that group-based self-management support may counteract blame and contribute in negotiations of identity for individuals with type 2 diabetes. This mechanism makes participation in groups beneficial for some but stigma inducing for others. © 2016 The Authors. Health Expectations Published by John Wiley & Sons Ltd.

  5. Implementing complex innovations: factors influencing middle manager support.

    Science.gov (United States)

    Chuang, Emmeline; Jason, Kendra; Morgan, Jennifer Craft

    2011-01-01

    Middle manager resistance is often described as a major challenge for upper-level administrators seeking to implement complex innovations such as evidence-based protocols or new skills training. However, factors influencing middle manager support for innovation implementation are currently understudied in the U.S. health care literature. This article examined the factors that influence middle managers' support for and participation in the implementation of work-based learning, a complex innovation adopted by health care organizations to improve the jobs, educational pathways, skills, and/or credentials of their frontline workers. We conducted semistructured interviews and focus groups with 92 middle managers in 17 health care organizations. Questions focused on understanding middle managers' support for work-based learning as a complex innovation, facilitators and barriers to the implementation process, and the systems changes needed to support the implementation of this innovation. Factors that emerged as influential to middle manager support were similar to those found in broader models of innovation implementation within the health care literature. However, our findings extend previous research by developing an understanding about how middle managers perceived these constructs and by identifying specific strategies for how to influence middle manager support for the innovation implementation process. These findings were generally consistent across different types of health care organizations. Study findings suggest that middle manager support was highest when managers felt the innovation fit their workplace needs and priorities and when they had more discretion and control over how it was implemented. Leaders seeking to implement innovations should consider the interplay between middle managers' control and discretion, their narrow focus on the performance of their own departments or units, and the dedication of staff and other resources for empowering their

  6. 25 CFR 900.118 - Do these “construction contract” regulations apply to construction management services?

    Science.gov (United States)

    2010-04-01

    ... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...” regulations apply to construction management services? No. Construction management services may be contracted separately under section 108 of the Act. Construction management services consultants and/or Indian tribe or...

  7. Management of health in the construction and assembly of land pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Richa, Newton M.M.; Ruella, Nildemar C [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The objectives of this study are: describe the main aspects of a health management experience in a work of construction and assembly of land pipeline, highlighting the positive impacts on safety and productivity; demonstrate that the general objective of the health function is to provide technical support to companies, information and services for leaders, managers, supervisors, workers and families in the management of multiple interfaces of health, especially the health-work interface; and demonstrate that the appropriate management of health may contribute significantly to the overall management of undertakings. (author)

  8. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  9. K-means clustering for support construction in diffractive imaging.

    Science.gov (United States)

    Hattanda, Shunsuke; Shioya, Hiroyuki; Maehara, Yosuke; Gohara, Kazutoshi

    2014-03-01

    A method for constructing an object support based on K-means clustering of the object-intensity distribution is newly presented in diffractive imaging. This releases the adjustment of unknown parameters in the support construction, and it is well incorporated with the Gerchberg and Saxton diagram. A simple numerical simulation reveals that the proposed method is effective for dynamically constructing the support without an initial prior support.

  10. STIMULATION OF CONSTRUCTION OF AFFORDABLE HOUSING BY REFORMATION OF A CONSTRUCTION COMPLEX MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    BRONEVYTSKYI S. P.

    2015-10-01

    Full Text Available Purpose. Development of offers on stimulation of construction of affordable housing by reformation of a construction complex management system. Methodology. The revelation of the problems of planning of construction in large cities. The analysis of forming of structure of a build complex management in soviet times and in a transitional period. The revelation of the modern, actual, socio-economic problems of the construction activity management. Proposition on the improvement of methods of construction management in cities of Ukraine. Results. The methods of a construction complex management in countries with a market economy as for building of affordable housing are shown. Originality. In composition of a town-planning documentations, except for the norms of the common use of territories of city (density of population of micro region, the maximum parameters of a construction examining of land areas are proposed to determine: building percent and coefficient of maximum superficial area. Practical value. The principle of management and organization of construction is norms of a build use of territories for building of mass affordable housing for funds of population and investors while providing of the comfort of housing in accordance with state construction norms.

  11. The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies

    Directory of Open Access Journals (Sweden)

    A.Q. Adeleke

    2018-03-01

    Full Text Available Background: Substantial empirical research has shown conflicting results regarding the influence of organizational external factors on construction risk management, suggesting the necessity to introduce a moderator into the study. The present research confirmed whether rules and regulations matter on the relationships between organizational external factors and construction risk management. Methods: Based on discouragement and organizational control theory, this research examined the effects of organizational external factors and rules and regulations on construction risk management among 238 employees operating in construction companies in Abuja and Lagos, Nigeria. A personally administered questionnaire was used to acquire the data. The data were analyzed using partial least squares structural equation modeling. Results: A significant positive relationship between organizational external factors and construction risk management was asserted. This study also found a significant positive relationship between rules and regulations and construction risk management. As anticipated, rules and regulations were found to moderate the relationship between organizational external factors and construction risk management, with a significant positive result. Similarly, a significant interaction effect was also found between rules and regulations and organizational external factors. Implications of the research from a Nigerian point of view have also been discussed. Conclusion: Political, economy, and technology factors helped the construction companies to reduce the chance of risk occurrence during the construction activities. Rules and regulations also helped to lessen the rate of accidents involving construction workers as well as the duration of the projects. Similarly, the influence of the organizational external factors with rules and regulations on construction risk management has proven that most of the construction companies that implement the

  12. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  13. A Study of the potency of construction service industries to support the first nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana

    2008-01-01

    The study was conducted to identify the potency of construction service industries to participate in nuclear power plant program in Indonesia. The potency is identified by evaluation results of national industries potency in some multinational construction service industries. The research methodology chosen was the survey method by sending questionnaires, visits to National industries, interview, and literature study. The data collection technique was sampling purposive. Data can be obtained from both primary and secondary data. The study results showed that the performance of construction service industries to support the NPP program must be increased through the selection of competent human resources, reliable equipment and an effective and efficient project management system, so that they can be expected to play necessary role in the nuclear power plant construction in Indonesia. (author)

  14. Putting into practice error management theory: Unlearning and learning to manage action errors in construction.

    Science.gov (United States)

    Love, Peter E D; Smith, Jim; Teo, Pauline

    2018-05-01

    Error management theory is drawn upon to examine how a project-based organization, which took the form of a program alliance, was able to change its established error prevention mindset to one that enacted a learning mindfulness that provided an avenue to curtail its action errors. The program alliance was required to unlearn its existing routines and beliefs to accommodate the practices required to embrace error management. As a result of establishing an error management culture the program alliance was able to create a collective mindfulness that nurtured learning and supported innovation. The findings provide a much-needed context to demonstrate the relevance of error management theory to effectively address rework and safety problems in construction projects. The robust theoretical underpinning that is grounded in practice and presented in this paper provides a mechanism to engender learning from errors, which can be utilized by construction organizations to improve the productivity and performance of their projects. Copyright © 2018 Elsevier Ltd. All rights reserved.

  15. Internet-based Interactive Construction Management Learning System.

    Science.gov (United States)

    Sawhney, Anil; Mund, Andre; Koczenasz, Jeremy

    2001-01-01

    Describes a way to incorporate practical content into the construction engineering and management curricula: the Internet-based Interactive Construction Management Learning System, which uses interactive and adaptive learning environments to train students in the areas of construction methods, equipment and processes using multimedia, databases,…

  16. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  17. Optimum Tower Crane Selection and Supporting Design Management

    Directory of Open Access Journals (Sweden)

    Hyo Won Sohn

    2014-08-01

    Full Text Available To optimize tower crane selection and supporting design, lifting requirements (as well as stability should be examined, followed by a review of economic feasibility. However, construction engineers establish plans based on data provided by equipment suppliers since there are no tools with which to thoroughly examine a support design's suitability for various crane types, and such plans lack the necessary supporting data. In such cases it is impossible to optimize a tower crane selection to satisfy lifting requirements in terms of cost, and to perform lateral support and foundation design. Thus, this study is intended to develop an optimum tower crane selection and supporting design management method based on stability. All cases that are capable of generating an optimization of approximately 3,000 ˜ 15,000 times are calculated to identify the candidate cranes with minimized cost, which are examined. The optimization method developed in the study is expected to support engineers in determining the optimum lifting equipment management.

  18. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  19. Advanced construction management for lunar base construction - Surface operations planner

    Science.gov (United States)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  20. an appraisal of construction management practice in nigeria

    African Journals Online (AJOL)

    user

    Keywords: Construction Project, Management tools, Project delivery, Construction Industry, Nigeria. 1. ..... developing country” International Journal of Project. Management, Vol. 18, Number 3 ... Construction Industry Perspective”, Building &.

  1. Management of design support for nuclear plant modifications

    International Nuclear Information System (INIS)

    Doyle, F.W.

    1991-01-01

    The paper will present an overview of the Ontario Hydro organization and processes for providing design support to the operating nuclear power plants. Examples of design support for Pickering GS will be highlighted. The process is described from identification of projects through the design, procurement, construction, commissioning and in-service phases. The practices for managing engineering deliverables are discussed in the context of how these integrate into the overall change control process. The interaction of Engineering with Operations, Construction, Supply and the regulatory bodies is discussed both for major retro-fit programs and for ongoing design support to the nuclear power plants. Recent experiences during the 1990 Pickering Station Outage and during the Unit 3 fuel channel replacement program are highlighted and an integrated 5 year plan for upgrading the safety related systems for the Pickering Nuclear Power Plant is presented. (author)

  2. Construct Measurement in Management Research

    DEFF Research Database (Denmark)

    Nielsen, Bo Bernhard

    2014-01-01

    Far too often do management scholars resort to crude and often inappropriate measures of fundamental constructs in their research; an approach which calls in question the interpretation and validity of their findings. Scholars often legitimize poor choices in measurement with a lack of availability......, this research note raises important questions about the use of proxies in management research and argues for greater care in operationalizing constructs with particular attention to matching levels of theory and measurement....

  3. Managing Client Values in Construction Design

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2008-01-01

    In construction projects the client will comprise both owner, end-users, and the wider society, representatives of which may have conflicting goals and values; and these may not be fully realized by the stakeholders themselves. Therefore it is a great challenge to capture and manage the values...... for capturing and managing client values within a lean framework. This paper describes the initial findings of a joint research project between academia and industry practitioners that seeks to develop the workshop method to create a state of the art approach in construction design management. This includes...... of the multiple stakeholders that constitutes the “client”. However, seeing client satisfaction as the end-goal of construction it is imperative to make client values explicit in the early project phase and make sure that these values are reflected in all subsequent phases of design and construction...

  4. Building Support for Research Data Management: Biographies of Eight Research Universities

    Directory of Open Access Journals (Sweden)

    Katherine G. Akers

    2014-10-01

    Full Text Available Academic research libraries are quickly developing support for research data management (RDM, including both new services and infrastructure. Here, we tell the stories of how eight different universities have developed programs of RDM support, focusing on the prominent role of the library in educating and assisting researchers with managing their data throughout the research lifecycle. Based on these stories, we construct timelines for each university depicting key steps in building support for RDM, and we discuss similarities and dissimilarities among universities in motivation to provide RDM support, collaborations among campus units, assessment of needs and services, and changes in staffing.

  5. Discursive construction of polyphony in healthcare management.

    Science.gov (United States)

    Hujala, Anneli; Rissanen, Sari

    2012-01-01

    The aim of the paper is to understand and define how the polyphony of management is constructed in interaction and to describe this through concrete management meeting cases. Polyphony refers to the diverse voices of various organization members, and how these voices are present, disclosed and utilized in management. The study is based on the social constructionist and discursive perspectives of management, which question the traditional, individualistic approaches of management. The issue was examined through a qualitative case study by analysing the micro-level management discourse in three healthcare organizations. Discursive practices that enhance or inhibit polyphony are often unnoticed and unconscious. Key moments of management discourse are an example of unconscious mundane practices through which members of organizations construct the reality of management. The empirical results are locally contextual. In the future, research will be able to apply the approach to diverse contexts as well as link micro-level discourses to the construction of broader health and social management discourses. The paper increases the understanding of how to enhance participation and staff contribution, and how to utilize the knowledge of all members of the organization. Both managers and other staff members are fully involved in the social construction of management. Micro-level discourse should be paid attention to in management work as well as in the education of managers and staff. The study increases the understanding of micro-level issues of management and challenges the conventional, taken-for-granted assumptions behind organization and management theories.

  6. Influential Factors Affecting Materials Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Jusoh Zairra Mat

    2017-12-01

    Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

  7. Supply Chain Management In Construction Revealed

    OpenAIRE

    Dr. Ghaith Al-Werikat

    2017-01-01

    The construction supply chain plays a major role in the construction market competition. Construction supply chain management assists enterprises by helping to improve competitiveness increase profits and have more control over the different factors and variables within the project. This paper discusses the construction supply chain characteristics challenges and problems supply chains encounter and the benefits of an integrated supply chain in the construction sector.

  8. Haiyang nuclear power construction management and practice

    International Nuclear Information System (INIS)

    Wang Fengxue

    2010-01-01

    The paper introduces the basic situation of Shandong Haiyang Nuclear Power Plant, as well as the management and progress of the project. Through the construction management practice, problems encountered in nuclear power construction are put forward for peer exchange and discussion. (author)

  9. Supply Chain Management In Construction Revealed

    Directory of Open Access Journals (Sweden)

    Dr. Ghaith Al-Werikat

    2017-03-01

    Full Text Available The construction supply chain plays a major role in the construction market competition. Construction supply chain management assists enterprises by helping to improve competitiveness increase profits and have more control over the different factors and variables within the project. This paper discusses the construction supply chain characteristics challenges and problems supply chains encounter and the benefits of an integrated supply chain in the construction sector.

  10. Factors associated with integrating self-management support into primary care.

    Science.gov (United States)

    Crespo, Richard; Shrewsberry, Molly

    2007-06-01

    The purpose of this article is to expand the understanding of self-management support by describing factors that contribute to implementing a comprehensive self-management program in primary care. Four rural health centers in medically underserved areas participated in a study to document the implementation of a self-management program. This program consisted of a social marketing plan and decision-making tools to guide patients in making self-management behavior changes. The stages of change constructs of the transtheoretical model were used to design the social marketing plan. Key informant interviews were conducted at 6-month and 9-month intervals to document the implementation process. A standardized set of questions was used in the interviews. The data from the interviews were analyzed using content analysis techniques. One of the principle findings is that self-management support requires putting a system in place, not just adding a new component to primary care. The health centers that fully implemented the self-management program made an organizational commitment to keep self-management on the agenda in management meetings, clinical staff set the example by adopting self-management behaviors, and patient self-management support was implemented in multiple patient care venues. Primary care centers with limited financial resources are able to integrate self-management support into their system of chronic illness care.

  11. The Crisis Management Practices of Australian Construction Companies

    Directory of Open Access Journals (Sweden)

    M Loosemore

    2012-11-01

    Full Text Available Recent world events in the international relations arena and the subsequent knock-on affect on the insurance industry, have sent shock-waves through Australia’s business community,elevating crisis management to the top of the managerial agenda. This paperpresents the findings of exploratory research, which investigated the crisis managementpractices of construction companies. Using a diagnostic model of crisis preparednesswhich has been developed and tested across a broad range of industries, it concludes thatif the sample surveyed is typical, then crisis planning is rudimentary and undertaken in aninsular, informal, fragmented fashion, supported by few resources and little strategicguidance. Consequently, many construction companies will have an inadequate understandingof their crisis exposure, of how to cope with crises when they happen and of howto learn and recover from their aftermath.

  12. Applying Sensor-Based Technology to Improve Construction Safety Management.

    Science.gov (United States)

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-08-11

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.

  13. Enterprise risk management in international construction operations

    CERN Document Server

    Zhao, Xianbo; Low, Sui Pheng

    2015-01-01

    This book provides readers an understanding of the implementation of Enterprise Risk Management (ERM) for international construction operations. In an extended case study, it primarily focuses on Chinese construction firms (CCFs) based in Singapore. In this regard, the book explains the differences and similarities between Risk Management (RM), Project Risk Management (PRM) and ERM in the construction industry, and examines their linkages for international construction operations in a broader context. The explanation elaborates on how companies may adopt and implement RM, PRM and ERM as appropriate in their various operations, both in their home market as well as in overseas host markets. The book also reviews the whole spectrum of work relating to organizational behavior (OB) as one of the key underpinnings for companies to evaluate and implement ERM. It will benefit practitioners from the industry as well as academics interested in the implementation of ERM practices in international construction operat...

  14. Construction techniques and management methods for BWR plants

    International Nuclear Information System (INIS)

    Shimizu, Yohji; Tateishi, Mizuo; Hayashi, Yoshishige

    1989-01-01

    Toshiba is constantly striving for safer and more efficient plant construction to realize high-quality BWR plants within a short construction period. To achieve these aims, Toshiba has developed and improved a large number of construction techniques and construction management methods. In the area of installation, various techniques have been applied such as the modularization of piping and equipment, shop installation of reactor internals, etc. Further, installation management has been upgraded by the use of pre-installation review programs, the development of installation control systems, etc. For commissioning, improvements in commissioning management have been achieved through the use of computer systems, and testing methods have also been upgraded by the development of computer systems for the recording and analysis of test data and the automatic adjustment of controllers in the main control system of the BWR. This paper outlines these construction techniques and management methods. (author)

  15. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  16. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  17. Data exploration of social client relationship management (CRM 2.0) adoption in the Nigerian construction business.

    Science.gov (United States)

    Ojelabi, Rapheal A; Afolabi, Adedeji O; Oyeyipo, Opeyemi O; Tunji-Olayeni, Patience F; Adewale, Bukola A

    2018-06-01

    Integrating social client relationship management (CRM 2.0) in the built environment can enhance the relationship between construction organizations and client towards sustaining a long and lasting collaboration. The data exploration analyzed the e-readiness of contracting and consulting construction firms in the uptake of CRM 2.0 and the barriers encountered in the adoption of the modern business tool. The targeted organizations consist of seventy five (75) construction businesses operating in Lagos State which were selected from a pool of registered contracting and consulting construction firms using random sampling technique. Descriptive statistics of the e-readiness of contracting and consulting construction firms for CRM 2.0 adoption and barriers limiting its uptake were analyzed. Also, inferential analysis using Mann-Whitney U statistical and independent sample t-test was performed on the dataset obtained. The data generated will support construction firms on the necessity to engage in client social relationship management in ensuring sustainable client relationship management in the built environment.

  18. Using Construction Management for Public and Institutional Facilities.

    Science.gov (United States)

    Public Technology, Inc., Washington, DC.

    Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…

  19. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Pingish, Panupong [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  20. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Pingish, Panupong; Choi, Kwang Sik

    2010-01-01

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  1. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    Science.gov (United States)

    2016-09-01

    supporting documentation for reviews that the U.S. Forces-Afghanistan conducted beginning in November 2011 of planned or ongoing contingency ...12 Contingency basing includes the planning , designing, constructing, operating, managing, and transitioning or closing of a non-enduring location...2016). Background Definition of “ Contingency Construction” Project Page 7 GAO-16-406 Defense Infrastructure statutory authority

  2. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  3. [Medication error management climate and perception for system use according to construction of medication error prevention system].

    Science.gov (United States)

    Kim, Myoung Soo

    2012-08-01

    The purpose of this cross-sectional study was to examine current status of IT-based medication error prevention system construction and the relationships among system construction, medication error management climate and perception for system use. The participants were 124 patient safety chief managers working for 124 hospitals with over 300 beds in Korea. The characteristics of the participants, construction status and perception of systems (electric pharmacopoeia, electric drug dosage calculation system, computer-based patient safety reporting and bar-code system) and medication error management climate were measured in this study. The data were collected between June and August 2011. Descriptive statistics, partial Pearson correlation and MANCOVA were used for data analysis. Electric pharmacopoeia were constructed in 67.7% of participating hospitals, computer-based patient safety reporting systems were constructed in 50.8%, electric drug dosage calculation systems were in use in 32.3%. Bar-code systems showed up the lowest construction rate at 16.1% of Korean hospitals. Higher rates of construction of IT-based medication error prevention systems resulted in greater safety and a more positive error management climate prevailed. The supportive strategies for improving perception for use of IT-based systems would add to system construction, and positive error management climate would be more easily promoted.

  4. Methodical ecologization principles in construction management

    OpenAIRE

    Nuzhina Irina Pavlovna; Yudakhina Olga Borisovna

    2015-01-01

    In the article the subject of ecologization of construction sector is presented, the necessity of ecologization technology and technological processes is proved. The article also presents principles of ecologically friendly management of construction and investment activities and describes these principles in detail.

  5. Determining the essential skill requirements for construction managers' practice in Nigeria

    Directory of Open Access Journals (Sweden)

    Olabode E Ogunsanmi

    2016-12-01

    Full Text Available The study investigates the essential skill requirements for construction managers in Nigeria. The objective is to determine the most important skill requirements for construction managers. A structured questionnaire was administered to construction professionals who worked recently with construction managers in their recently completed projects. Snowballing sampling technique was used to select seventy (70 respondents, however only forty (40 responses were used for the data analysis. The results indicate that essential skills required by the construction managers for their jobs include: procedural-industrial skills, quality assurance/management, listening skills, knowledge of codes and regulations, sustainable skills and ability to learn skills. These skills are important for the construction manager to practice effectively in Nigeria and other developing countries. These findings have seven practical implications to professional bodies, Universities and other trainers of construction managers, whose present curricula may be deficient in knowledge areas in industry (business, managerial, personal and technical. These institutions may need to re-orientate and improve the curricula for newly trained construction managers to cope with current skill requirements. On the other hand, recruiting agencies should ensure that job applicants with the right hard and soft skills are engaged as construction managers. Consequently efficient and effective management of future construction projects in Nigeria and other developing countries can be ensured.

  6. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  7. Knowledge management in support of enterprise risk management

    OpenAIRE

    Rodriguez, Eduardo; Edwards, John S.

    2014-01-01

    Risk management and knowledge management have so far been studied almost independently. The evolution of risk management to the holistic view of Enterprise Risk Management requires the destruction of barriers between organizational silos and the exchange and application of knowledge from different risk management areas. However, knowledge management has received little or no attention in risk management. This paper examines possible relationships between knowledge management constructs relate...

  8. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  9. Construction Management: Building Schools Faster in the International Marketplace

    Science.gov (United States)

    Scarano, Joseph J.

    1976-01-01

    Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)

  10. Relational approach in managing construction project safety: a social capital perspective.

    Science.gov (United States)

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  11. Information systems for material flow management in construction processes

    Science.gov (United States)

    Mesároš, P.; Mandičák, T.

    2015-01-01

    The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.

  12. Best Practice of Construction Waste Management and Minimization

    Directory of Open Access Journals (Sweden)

    Khor Jie Cheng

    2014-07-01

    Full Text Available Material management is an important issue as seen in construction waste management. Best practice of material management is accompanied by various benefits which are acknowledged by several studies. The site layout has particular effects on both materials and their waste through effective waste management practice. Ignoring the benefits of material management could result in a daily reduction in productivity of up to 40% by material wastage. Thus, the benefits of effective material management must be well comprehended for the sake of waste minimization. Another convincing fact about waste is that poor site management accounts for the largest factor of waste generation. Hence the site condition is very crucial in developing effective material management. Factors contributing to the efficiency of material management process are effective logistical management and supply chain management. The logistics system must be performing as schedule so that materials are wisely managed on-site without encountering presence of excessive materials. As materials management is closely related to logistics in construction projects, there will be delay in construction projects when materials are not delivered to site as scheduled. The management must be effective in terms of delivery, off-loading, storage, handling, on-site transportation and on-site utilization of materials.

  13. Solid construction waste management in large civil construction companies through use of specific software - case study

    Directory of Open Access Journals (Sweden)

    Caio Dalla Zanna

    2017-05-01

    Full Text Available In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about waste. This helps the decision makers, at all different levels of the company improving waste management through better decisions. The software program was used during the construction of two residential buildings, constructed by a large construction company in the South of Brazil. Five key performance indicators were used by the construction company team: Generated Waste Height (cm, cost per built area (R$ m-², Waste Segregation Quality Index (WSQI, Effective Waste Management Index (EWMI and Waste Management Quality Index (WMQI. After four months the total cost of waste management was R$ 83,551.71 for site A and R$ 91,668.02 for site B. About 70% of the waste was raw material waste. The software program provided information not previously available, which made it possible to calculate the cost of material loss, indicating corrective actions, all without losing sight of cost reduction opportunities for the management of Solid construction Waste (SCW.

  14. Waste Management in Industrial Construction: Investigating Contributions from Industrial Ecology

    Directory of Open Access Journals (Sweden)

    Larissa A. R. U. Freitas

    2017-07-01

    Full Text Available The need for effective construction waste management is growing in importance, due to the increasing generation of construction waste and to its adverse impacts on the environment. However, despite the numerous studies on construction waste management, recovery of construction waste through Industrial Symbiosis and the adoption of other inter-firm practices, comprised within Industrial Ecology field of study, have not been fully explored. The present research aims to investigate Industrial Ecology contributions to waste management in industrial construction. The waste management strategies adopted in two industrial construction projects in Brazil are analyzed. The main waste streams generated are identified, recycling and landfilling diversion rates are presented and waste recovery through Industrial Symbiosis is discussed. A SWOT analysis was carried out. Results demonstrate that 9% of the waste produced in one of the projects was recovered through Industrial Symbiosis, while in the other project, waste recovery through Industrial Symbiosis achieved the rate of 30%. These data reveal Industrial Symbiosis’ potential to reduce landfilling of industrial construction wastes, contributing to waste recovery in construction. In addition, results show that industrial construction projects can benefit from the following synergies common in Industrial Ecology place-based approaches: centralized waste management service, shared waste management infrastructure and administrative simplification.

  15. Estimation of construction waste generation and management in Thailand.

    Science.gov (United States)

    Kofoworola, Oyeshola Femi; Gheewala, Shabbir H

    2009-02-01

    This study examines construction waste generation and management in Thailand. It is estimated that between 2002 and 2005, an average of 1.1 million tons of construction waste was generated per year in Thailand. This constitutes about 7.7% of the total amount of waste disposed in both landfills and open dumpsites annually during the same period. Although construction waste constitutes a major source of waste in terms of volume and weight, its management and recycling are yet to be effectively practiced in Thailand. Recently, the management of construction waste is being given attention due to its rapidly increasing unregulated dumping in undesignated areas, and recycling is being promoted as a method of managing this waste. If effectively implemented, its potential economic and social benefits are immense. It was estimated that between 70 and 4,000 jobs would have been created between 2002 and 2005, if all construction wastes in Thailand had been recycled. Additionally it would have contributed an average savings of about 3.0 x 10(5) GJ per year in the final energy consumed by the construction sector of the nation within the same period based on the recycling scenario analyzed. The current national integrated waste management plan could enhance the effective recycling of construction and demolition waste in Thailand when enforced. It is recommended that an inventory of all construction waste generated in the country be carried out in order to assess the feasibility of large scale recycling of construction and demolition waste.

  16. Knowledge Management Practice in Two Australian Architecture-Engineering-Construction (AEC Companies

    Directory of Open Access Journals (Sweden)

    Patrick Zou

    2012-11-01

    Full Text Available Knowledge management (KM could be described as a management system that supports the creation, sharing and retrieving of valued information, expertise and insight within and across communities of people and related organizations using information and communication technologies and hence it is a combination of the effective application of information technlogy and management of human resources. KM is becoming a core competitive factor in construction operations. This paper presents the results of two case studies of KM practices in large AEC (architecture, engineering and construction companies through desk-top study and semi-structured interviews. The results indicate that implementing KM in AEC companies leads to competitive advantages and improved decision-making, problem solving and business performance. The results also indicateed that while technology plays an important role, top management commitment, total employee involvement, performance assessment and the culture of knowledge-learning and sharing must be considered when implementing KM. Therefore it is suggested that the implementation of KM should incorporate the company's vision, work processes, technology and culture, to improve the ability of knowledge creating, capturing, sharing, retrieving and ultimately, to improve the company's competitive advantage, decision making, problem solving and innovation.

  17. Management as a Symbolizing Construction? Re-Arranging the Understanding of Management

    Directory of Open Access Journals (Sweden)

    Katharina Mayr

    2010-09-01

    Full Text Available In this article, we outline the concept of management as a symbolizing construction. According to Niklas LUHMANN, organizations process by referring to decisions. But decisions are not simply "given" and in principle invisible. This is the reason why organizations institute formalities like protocols, signatures or other insignia of the official that symbolize the decision—without actually being a decision. These symbols allow for making decisions "process-able." And just like a protocol or a signature, management symbolizes decisions as well. Management provides an organizational practice with symbols of decision making without being the "unity" of the decisions, as decisions perpetually have to be reconstructed, redefined and rearranged in the communication of all organizational units. Therefore management symbolizes on the one hand more than it can achieve. On the other hand the importance of management as a symbolizing construction lies in allowing the reconstruction, redefining and rearrangement of decisions by making them visible and recognizable. Heroic managers, meetings, management tools and procedures are solutions to the paradox of decision making. By symbolizing decidedness they create credibilities that conceal the self-referential construction of organizational communication and the paradox of its decision praxis. URN: urn:nbn:de:0114-fqs1003218

  18. Reuse Tools to Support ADA Instantiation Construction

    Science.gov (United States)

    1990-06-01

    specification and body with embedded task shell instantiations, as well as an inter-task coordination procedure which controls task activation, execution, and...Tools to Support Ada Instantiation Construction 3 - Generalized Construction Approaches Page 39 4Automatic Programming Programmer’s Apprentice ~ASLs...which is the root of a frame hierarchy. The specification frame controls the hierarchy’s composition of the program and stores all its custom

  19. Practice of knowledge management for institutes--take the construction of experience feedback system as the example

    International Nuclear Information System (INIS)

    Wu Kaiping

    2014-01-01

    The construction of experience feedback system is an important part and breakthrough point of institutes' knowledge management. It is significant for institutes' design, management, development and innovation. This article introduces the concept of experience feedback for institutes. It also goes details of the content of experience feedback system construction for institutes, including the founding of experience feedback organizational mechanism, the development of experience feedback system, construction of knowledge database system, the construction of knowledge resources, and the appraisal of experience feedback's performance. Furthermore, the recognition and support of leaders, understanding and cooperation of relative departments, and corporation's culture of encouraging knowledge sharing, also are the important guarantees for the good effects of institutes' experience feedback work. (author)

  20. Enhancing knowledge sharing management using BIM technology in construction.

    Science.gov (United States)

    Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui

    2013-01-01

    Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.

  1. Quality Management System at Construction Project: A Questionnaire Survey

    OpenAIRE

    P.P.Mane; J.R.Patil

    2015-01-01

    The best quality, time and cost are the important aspects of successful construction project which fulfills the main goal of construction industry. The quality management has to provide the environment within which related tools, techniques and procedures can be deployed effectively leading to operational success for a construction project. The role of quality management for a construction company is not an isolated activity, but intertwined with all the operational and managerial...

  2. Approach to improve construction management utilizing information technology

    International Nuclear Information System (INIS)

    Lee, Woo Bang; Moon, Jin Yeong

    2003-01-01

    Korea Hydro and Nuclear Power (KHNP) has been managed Nuclear Power Plant (NPP) construction projects including basic project planning, design, procurement, construction and start-up for nearly 30 years, and taken the leading role in the self-reliance program for constructing NPP. To maintain its leading position of construction technology and export it to other countries, it is more likely required to build the strong and competitive business management system to improve internal business efficiency and transparency, and also to respond to the change of external business circumstances such as electricity market opening. KHNP is implementing Enterprise Resource Planning (ERP) System as a business innovation tool to improve business efficiency, which changes the way of performing work from organizational system to process-oriented system in order to optimize the company resources to achieve above goals. This change should be made based on the results of performing Business Process Re-engineering (BPR) to maximize overall business efficiency. For the construction project management area, the establishment of Integrated Construction Information Sharing System based on Information Technology (IT) is the most important part. It makes possible to build collaboration system with 'Win-Win strategy' between the project owner and all related entities and to contribute to secure transparency and cut the project cost down. We would like to introduce our NPP Construction Project Management System, Infrastructure for Information System, Information Sharing System among construction related entities and Implementation Practices in this paper and also include the suggestions on our customary practice and subject that should be improved

  3. Sustainable Management of Construction and Demolition Materials

    Science.gov (United States)

    This web page discusses how to sustainably manage construction and demolition materials, Information covers, what they are, and how builders, construction crews, demolition teams,and deign practitioners can divert C&D from landfills.

  4. Healthcare managers' construction of the manager role in relation to the medical profession.

    Science.gov (United States)

    von Knorring, Mia; Alexanderson, Kristina; Eliasson, Miriam A

    2016-05-16

    Purpose - The purpose of this paper is to explore how healthcare managers construct the manager role in relation to the medical profession in their organisations. Design/methodology/approach - In total, 18 of Sweden's 20 healthcare chief executive officers (CEOs) and 20 clinical department managers (CDMs) were interviewed about their views on management of physicians. Interviews were performed in the context of one aspect of healthcare management; i.e., management of physicians' sickness certification practice. A discourse analysis approach was used for data analysis. Findings - Few managers used a management-based discourse to construct the manager role. Instead, a profession-based discourse dominated and managers frequently used the attributes "physician" or "non-physician" to categorise themselves or other managers in their managerial roles. Some managers, both CEOs and CDMs, shifted between the management- and profession-based discourses, resulting in a kind of "yes, but […]" approach to management in the organisations. The dominating profession-based discourse served to reproduce the power and status of physicians within the organisation, thereby rendering the manager role weaker than the medical profession for both physician and non-physician managers. Research limitations/implications - Further studies are needed to explore the impact of gender, managerial level, and basic profession on how managers construct the manager role in relation to physicians. Practical implications - The results suggest that there is a need to address the organisational conditions for managers' role taking in healthcare organisations. Originality/value - Despite the general strengthening of the manager position in healthcare through political reforms during the last decades, this study shows that a profession-based discourse clearly dominated in how the managers constructed the manager role in relation to the medical profession on the workplace level in their organisations.

  5. USAID Construction Assessment

    Data.gov (United States)

    US Agency for International Development — The USAID construction assessment is a survey of the character, scope, value and management of construction activities supported by USAID during the period from June...

  6. Modern Methods for Cost Management in Construction Enterprises

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2015-06-01

    Full Text Available Cost management should be seen as an essential function of enterprises which perform their activities in current market environment. One of the main factors affecting the level of achieved profit and favourable market position is cost structure. The company's ability to obtain necessary and reliable information on their own cost, subsequent processing and effective cost management is crucial for achieving success. This study focuses on cost management and the use of modern methods of cost management in construction enterprises. The aim of this paper is to identify approaches to cost management in Slovak construction enterprises, based on own empirical research.

  7. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  8. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  9. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry.

    Science.gov (United States)

    Yoon, Seok J; Lin, Hsing K; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-12-01

    The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.

  10. Methodology to Estimate the Quantity, Composition, and Management of Construction and Demolition Debris in the United States

    Science.gov (United States)

    This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estima...

  11. Procurement management for modification of supports and hangers in Tianwan nuclear power station phase I

    International Nuclear Information System (INIS)

    Jin Jiadong

    2015-01-01

    After completing construction of TNPS Phase I, some of supports and hangers supplied by Russia including many nuclear safety class supports and hangers were unexpectedly found quality problem. It is necessary to purchase the domestic product as replacement. The works on modification of supports and hangers became one of the key paths of TNPS construction. Under condition of that there isn't any reference in this aspect in nuclear power construction, Jiangsu Nuclear Power Corporation has always adhered to the principle of 'Safety first and quality first', overcome many difficulties of procurement, carried out the procurement work scientifically and reasonably under the condition of urgent need for the engineering construction, and ensured the quality control and schedule control. A large amount of procurement works for the modified supports and hangers were finished within short period. This firmly assured the construction period of TNPS. At the same time, a method of procurement management under the condition of urgent need for the engineering construction has been explored. (author)

  12. Overcoming ICT Barriers in IBS Management Process in Malaysia Construction Industry

    Directory of Open Access Journals (Sweden)

    Soon Ern Peniel Ang

    2017-01-01

    Full Text Available As the result of government’s initiative and future outlook in uprising the awareness towards the implementation of sustainable elements in construction industries, the Industrialized Building System (IBS is one of the approaches that had been introduced as an alternative to conventional building method and produce the new strategy of reducing the waste of materials in construction. The IBS approach is actively promoted through several strategies and incentives as an alternative to conventional building methods. Extensive uptakes of modern Information Communication Technology (ICT applications are able to support the different IBS processes for effective production. However, it is argued that ICT uptake at the organizational level needs to be regularly improved. Thus, this paper fulfills the need to identify the critical barriers to ICT employment and highlighting the ICT drivers in enhancing the IBS management process. Critical barriers and drivers to ICT uptake were identified through questionnaire survey with industry stakeholders and were analyzed using mean index and critical t-value with the use of SPSS software. The critical drivers are top management support and commitment and improving the availability of the technologies. The critical drivers which were identified are significant in ensuring the enhancement of ICT implementation. Hence, any system in place should avoid the highest ranked barriers or seek to alleviate their impact by focusing on the identified drivers in order to enhance implementation of ICT in IBS process management.

  13. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  14. Social support for diabetes illness management: supporting adolescents and caregivers.

    Science.gov (United States)

    Idalski Carcone, April; Ellis, Deborah A; Weisz, Arlene; Naar-King, Sylvie

    2011-10-01

    The aim of this research study was to examine the relationship between 4 sources of social support (support for the adolescent from family, support for the adolescent from friends, support for the caregiver from another adult, and support to the family from the health care provider) and adolescents' diabetes outcomes (illness management behavior and health status) using a diverse sample of urban adolescents. One hundred forty-one adolescents with insulin-managed diabetes and their primary caregivers completed questionnaires assessing social support and illness management behavior. Glucose meters were downloaded and hemoglobin A1c assays were obtained. Structural equation modeling was used to test a model social support informed by social ecological theory. The results of the structural equation modeling indicated that support for the caregiver from another adult was directly and positively related to support for the adolescent from family and indirectly related to better illness management. Support for the adolescent from family was directly related to better diabetes management and, through better management, to better diabetes health. Support to the family from the health care provider was not related to support for the adolescent and support to the adolescent from friends was not related to illness management, as hypothesized. This study identifies a novel target for social support intervention to improve adolescents' illness management behavior-the caregivers of adolescents with diabetes. By enhancing the social support caregivers receive from other adults in their lives, caregivers' ability to support their adolescent children with diabetes might also be improved which, in turn, improves adolescents' illness outcomes.

  15. Assessment Framework and Decision—Support System for Consolidating Urban-Rural Construction Land in Coastal China

    Directory of Open Access Journals (Sweden)

    Fangfang Cai

    2014-11-01

    Full Text Available Urbanization transforms urban-rural landscape and profoundly affects ecological processes. To maintain a sustainable urbanization, two important issues of land-use need to be quantified: the comprehensive variation of urban-rural construction land and the specific models for consolidating these lands. The purpose of this study is to develop a framework to assess the change of urban-rural construction land and build a decision-support system for consolidating these lands. Four sub-layers were first built in the assessment framework, including the characteristic layer, the coordination layer, the potential layer and the urgency layer. Each layer encompassed specific indices for evaluating the change of urban-rural construction land in different aspects. The entropy method was then applied to the data resources from Landsat TM (Thematic Mapper images, statistical data and overall land-use and land consolidation planning of Nantong city in coastal China to allocate weightings to the indices in each sub-layer. Finally, the decision-support system was built based on the assessment results and the degree of importance for consolidating urban and rural construction land, respectively. The results of our study show an overall investigation and quantitative description of the change of urban-rural construction land and provide an effective framework for land consolidation and land use management.

  16. Design, construction and commissioning of the new solid waste management and storage facilities of Ignalina NPP, Lithuania

    Energy Technology Data Exchange (ETDEWEB)

    Goehring, R.; Wenninger, K. [RWE NUKEM GmbH, Alzenau (Germany)

    2006-04-15

    The contract for the design, construction and commissioning (turn-key) of the New Solid Waste Management and Storage Facilities (SWMSF) has been awarded to RWE NUKEM GmbH. The contract was signed on the 30.11.2005. The New Solid Waste Management and Storage Facilities (SWMSF) are financed by the Ignalina Decommissioning Support Fund which is managed by European Bank for Reconstruction and Development (EBRD). The new facilities are required on the Ignalina Nuclear Power Plant (INPP) in order to support ongoing decomissioning work, including removal of waste from existing waste storage buildings. (orig.)

  17. Management of construction safety at KKNPP site

    International Nuclear Information System (INIS)

    Khare, P.K.

    2016-01-01

    Construction is considered as one of the most hazardous activities owing to the number of accidents and injuries. At KKNPP, management of industrial safety has been envisaged since the preliminary stage of construction planning, including design aspects. The governing principles of safety management are evolved from the Factories Act, 1948, the Atomic Energy(Factories) Rules, 1996, AERB safety guidelines on Control of works (2011) and Corporate HSE policy of NPCIL (2014). Numerous risk assessment and hazard control measures are adopted consistently to ensure a safe work environment during the construction, which includes Job Hazard Analysis, work permit through Computerized Maintenance Management System, safety procedures, exclusive safety training facility for the contractor's workmen, safety motivational measures, safety surveillance and reporting through Safety Related Deficiencies Management System. Assessment of efficacy of safety management system is continuously done through safety audits and observations are being circulated and discussed in committee meetings. Fire safety is also being taken care of since inception of project work. Well-equipped fire station with trained fire fighters was made available since the beginning as per AERB safety standard on fire protection system for Nuclear facilities. Fire prevention measures specific to the work are implemented during all activities. (author)

  18. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    Finland is one of the foremost countries in the world in developing the disposal of spent fuel. The construction license application for the Olkiluoto spent fuel disposal facility was submitted to the authorities at the end of 2012 and the facility is expected to start operation around 2020. This has been a long-term project with over 30 years of parallel development of the repository project and the regulatory approach to spent fuel management. In 1983 the government made a strategic decision on the objectives and target time schedule for the research, development and technical planning of nuclear waste management. While an export and international disposal solution was still the preferred option, this decision required the licensees without this possibility to prepare for disposal in Finland and it also gave the time line for the milestones on the way to an operating disposal facility by 2020. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act and Decree (1987, 1988). These licensing steps are: - Decision-in-principle is required for a nuclear facility having considerable general significance. This is essentially a political decision: the government decides if the construction project is in line with the overall good of society. The decision can be applied for one or more sites, the host municipality has a veto right and the parliament has the choice of ratifying or not ratifying the decision. - Construction license is granted by the government and authorises the construction of the disposal facility. The actual construction is regulated by STUK and includes several review and approval steps, hold points and viewpoints. - Operational license is granted by the government and authorises the operation of the facility for a certain period. The operational license is needed before nuclear waste can be disposed. The first step in the licensing process was reached

  19. Design and Construction of an Entity Resolution System that Supports Entity Identity Information Management and Asserted Resolution

    Science.gov (United States)

    Nelson, Eric Derrand

    2011-01-01

    This work describes the design and construction of an open source, entity resolution system that enables users to assign and maintain persistent identifiers for master data items. Two key features of this system that are not available in current ER systems and that make persistent identification possible are (1) The capture and management of…

  20. Waste Management in Industrial Construction: Investigating Contributions from Industrial Ecology

    OpenAIRE

    Larissa A. R. U. Freitas; Alessandra Magrini

    2017-01-01

    The need for effective construction waste management is growing in importance, due to the increasing generation of construction waste and to its adverse impacts on the environment. However, despite the numerous studies on construction waste management, recovery of construction waste through Industrial Symbiosis and the adoption of other inter-firm practices, comprised within Industrial Ecology field of study, have not been fully explored. The present research aims to investigate Industrial Ec...

  1. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  2. MPI support in the DIRAC Pilot Job Workload Management System

    International Nuclear Information System (INIS)

    Tsaregorodtsev, A; Hamar, V

    2012-01-01

    Parallel job execution in the grid environment using MPI technology presents a number of challenges for the sites providing this support. Multiple flavors of the MPI libraries, shared working directories required by certain applications, special settings for the batch systems make the MPI support difficult for the site managers. On the other hand the workload management systems with Pilot Jobs became ubiquitous although the support for the MPI applications in the Pilot frameworks was not available. This support was recently added in the DIRAC Project in the context of the GISELA Latin American Grid Initiative. Special services for dynamic allocation of virtual computer pools on the grid sites were developed in order to deploy MPI rings corresponding to the requirements of the jobs in the central task queue of the DIRAC Workload Management System. Pilot Jobs using user space file system techniques install the required MPI software automatically. The same technique is used to emulate shared working directories for the parallel MPI processes. This makes it possible to execute MPI jobs even on the sites not supporting them officially. Reusing so constructed MPI rings for execution of a series of parallel jobs increases dramatically their efficiency and turnaround. In this contribution we describe the design and implementation of the DIRAC MPI Service as well as its support for various types of MPI libraries. Advantages of coupling the MPI support with the Pilot frameworks are outlined and examples of usage with real applications are presented.

  3. Analysis and management of risks experienced in tunnel construction

    Directory of Open Access Journals (Sweden)

    Cagatay Pamukcu

    2015-12-01

    Full Text Available In this study, first of all, the definitions of "risk", "risk analysis", "risk assessment" and "risk management" were made to avoid any confusions about these terms and significance of risk analysis and management in engineering projects was emphasized. Then, both qualitative and quantitative risk analysis techniques were mentioned and within the scope of the study, Event Tree Analysis method was selected in order to analyze the risks regarding TBM (Tunnel Boring Machine operations in tunnel construction. After all hazards that would be encountered during tunnel construction by TBM method had been investigated, those hazards were undergoing a Preliminary Hazard Analysis to sort out and prioritize the risks with high scores. When the risk scores were taken into consideration, it was seen that the hazards with high risk scores could be classified into 4 groups which are excavation + support induced accidents, accidents stemming from geologic conditions, auxiliary works, and project contract. According to these four classified groups of initiating events, Event Tree Analysis was conducted by taking into care 4 countermeasures apart from each other. Finally, the quantitative and qualitative consequences of Event Tree Analyses, which were undertaken for all initiating events, were investigated and interpreted together by making comparisons and referring to previous studies.

  4. Leveraging Text Content for Management of Construction Project Documents

    Science.gov (United States)

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  5. The four roles of supply chain management in construction

    NARCIS (Netherlands)

    Vrijhoef, R.; Koskela, L.

    2000-01-01

    It is argued that due to construction peculiarities, supply chain management has four specific roles in construction. Practical initiatives in each role to advance the construction supply chain are analysed. The present status of construction supply chains is investigated by means of case studies

  6. Fluid management in the optimization of space construction

    Science.gov (United States)

    Snyder, Howard

    1990-01-01

    Fluid management impacts strongly on the optimization of space construction. Large quantities of liquids are needed for propellants and life support. The mass of propellant liquids is comparable to that required for the structures. There may be a strong dynamic interaction between the stored liquids and the space structure unless the design minimizes the interaction. The constraints of cost and time required optimization of the supply/resupply strategy. The proper selection and design of the fluid management methods for: slosh control; stratification control; acquisition; transfer; gauging; venting; dumping; contamination control; selection of tank configuration and size; the storage state and the control system can improve the entire system performance substantially. Our effort consists of building mathematical/computer models of the various fluid management methods and testing them against the available experimental data. The results of the models are used as inputs to the system operations studies. During the past year, the emphasis has been on modeling: the transfer of cryogens; sloshing and the storage configuration. The work has been intermeshed with ongoing NASA design and development studies to leverage the funds provided by the Center.

  7. Potential and Benefits of Building Information Modeling (BIM) During Pre-Construction, Construction and Post Construction Stage

    OpenAIRE

    Aw Nien Wei; Md Azree Othuman Mydin

    2017-01-01

    The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology current...

  8. Industrial safety management with emphasis on construction safety

    International Nuclear Information System (INIS)

    Bhattacharya, R.

    2016-01-01

    Safety professionals, line managers, team leaders and concerned workers today eagerly discuss to find out the best safety approach for their workplace. Some research suggested that behaviour based and comprehensive ergonomics approaches lead in average reduction of injuries. This article discusses 'the science and engineering' behind improvement in industrial safety aspects particularly at construction sites through various safety approaches. A high degree of commitment to safety by the project management and rigorous and proactive measures are essential to prevent accidents at construction sites particularly in DAE units because of its sensitivity. Persistent efforts by the project management are needed for sustainable and committed safety at work place. The number of fatalities occurring from construction work in DAE units is sometimes disturbing and fall of person from height and through openings are the major causes for serious accidents

  9. Environmental management systems - before, during and after construction

    International Nuclear Information System (INIS)

    Braun, T.L.

    1997-01-01

    The purpose of this paper is to describe an operational environmental managment system (EMS) as developed by TransCanada PipeLines, including an example of the application and concomitant benefits. The focus will be on the planning, construction, inspection and post-construction monitoring programs, covering approximately 3,190 kilometers of large diameter pipeline constructed between 1990 and 1996, across a wide range of Canadian land-uses and ecosystems. With the implementation of such systems, governments have recognized that corporate responsibility and self-management on environmental matters can result in effective, environmentally sound programs that minimize impacts and allow for a more cost-effective and streamlined regulatory approach. (au)

  10. The construction of enterprise content management platform

    International Nuclear Information System (INIS)

    Liu Diyong

    2010-01-01

    The paper introduces the content management platform development background and the construction mode of Sanmen Nuclear Power Co., Ltd. It also proposes the system design architecture, especially focuses on the implementation of the project, the key technical issues and the project management experience. In addition, it describes how to classify, manage and use the unformatted information, digital assets and documents. (author)

  11. School Construction Management: Expert Administrators Speak.

    Science.gov (United States)

    Fickes, Michael

    2001-01-01

    Presents expert opinion on school construction management communication concerning educational needs, obtaining consensus among diverse groups, and envisioning what schools must offer in the future. Why furniture issues are also important is highlighted. (GR)

  12. The emotional context of self-management in chronic illness: A qualitative study of the role of health professional support in the self-management of type 2 diabetes

    Directory of Open Access Journals (Sweden)

    Dunbar James

    2008-10-01

    Full Text Available Abstract Background Support for patient self-management is an accepted role for health professionals. Little evidence exists on the appropriate basis for the role of health professionals in achieving optimum self-management outcomes. This study explores the perceptions of people with type 2 diabetes about their self-management strategies and how relationships with health professionals may support this. Methods Four focus groups were conducted with people with type 2 diabetes: two with English-speaking and one each with Turkish and Arabic-speaking. Transcripts from the groups were analysed drawing on grounded hermeneutics and interpretive description. Results We describe three conceptually linked categories of text from the focus groups based on emotional context of self management, dominant approaches to self management and support from health professionals for self management. All groups described important emotional contexts to living with and self-managing diabetes and these linked closely with how they approached their diabetes management and what they looked for from health professionals. Culture seemed an important influence in shaping these linkages. Conclusion Our findings suggest people construct their own individual self-management and self-care program, springing from an important emotional base. This is shaped in part by culture and in turn determines the aims each person has in pursuing self-management strategies and the role they make available to health professionals to support them. While health professionals' support for self-care strategies will be more congruent with patients' expectations if they explore each person's social, emotional and cultural circumstances, pursuit of improved health outcomes may involve a careful balance between supporting as well as helping shift the emotional constructs surrounding a patient life with diabetes.

  13. Careers in Construction: Construction Industry Series: Student Manual and Instructor's Guide.

    Science.gov (United States)

    Texas Education Agency, Austin. Dept. of Occupational Education and Technology.

    The guide for instructors of construction occupations provides instructional suggestions and informational sources for structuring an exploratory program. The program is divided into the following blocks, representing different experiences in construction: (1) wood; (2) finishing; (3) engineering, support, and management services; (4) metal; (5)…

  14. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  15. Risk management as an executive task in the construction of Wendelstein 7-X

    Energy Technology Data Exchange (ETDEWEB)

    Vilbrandt, Reinhard, E-mail: Reinhard.Vilbrandt@ipp.mpg.de [Max Planck Institute for Plasma Physics, EURATOM Association, Wendelsteinstr. 1, 17491 Greifswald (Germany); Bosch, Hans-Stephan; Eeten, Paul van [Max Planck Institute for Plasma Physics, EURATOM Association, Wendelsteinstr. 1, 17491 Greifswald (Germany)

    2013-10-15

    Highlights: Development, manufacturing, and assembly are subdivided into clearly defined steps. Because of importance, specifications are supported by clear structured templates. Database with information about changes and nonconformities allows risk assessment. To discover impacts or dependencies single risks are assigned to several subsystems. Connection to safety device database supports definition of safe operational limits. -- Abstract: To manage all risks during construction, commissioning and later operation of complex fusion experiments like the stellarator W7-X it is necessary to have a thorough and highly efficient approach. It is an executive task of the upper management to anticipate, analyze and to build up a system of measures to prevent the occurrence of potential risks or to handle the risks in such a way to minimize the impact. Very good experience has been made with the introduction of a uniform quality management system which takes into account both the processes and the technology. The most important risks for the project and the decisions made to manage them are outlined briefly.

  16. Exploitation of cloud computing in management of construction projects in Slovakia

    Directory of Open Access Journals (Sweden)

    Mandičák Tomáš

    2016-12-01

    Full Text Available The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT services based on the exploitation of Web (it represents a cloud and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.

  17. VALUE-BASED APPROACH TO MANAGING CURRENT ASSETS OF CORPORATE CONSTRUCTION COMPANIES

    Directory of Open Access Journals (Sweden)

    Galyna Shapoval

    2017-09-01

    Full Text Available In modern conditions of management, the value of an enterprise becomes the main indicator, which is learned not only by scientists, but also by owners of enterprise and potential investors. Current assets take a very important place among the factors that affect the value of an enterprise, so management of current assets becomes more acute from the point of their impact on enterprise value. The purpose of the paper is to develop a system of value-based management of corporate construction companies’ current assets. The main tasks are: the study of current assets impact on the value of corporate construction companies, the definition of value-based approach to managing current assets of corporate enterprises and development of value-based management system of corporate construction companies’ current assets by elements. General scientific and special research methods were used while writing the work. Value-based management of current assets involves value-based management of the elements of current assets. The value-based inventory management includes the following stages of management: the assessment of reliability and choice of supplier according to the criterion of cash flow maximization, the classification of stocks in management accounting according to the rhythm of supply and the establishment of periodicity of supplies in accordance with the needs of the construction process. The value-based management of accounts receivable includes the following stages of management: assessment of the efficiency of investment of working capital into accounts receivable, the assessment of customers' loyalty and the definition of credit conditions and monitoring of receivables by construction and debt instruments. Value-based cash management involves determining the required level of cash to ensure the continuity of the construction process, assessing the effectiveness of cash use according to the criterion of maximizing cash flow, as well as budget

  18. Construction safety management guide for use with DOE Order 440.1

    International Nuclear Information System (INIS)

    1997-01-01

    DOE Order (DOE O) 440.1, Worker Protection Management for DOE Federal and Contractor Employees, establishes the framework for an effective worker protection program to reduce or eliminate accidental losses, injuries, and illnesses by providing workers with places of employment free of recognized hazards. In addition to prescribing program requirements applicable to all activities performed by DOE and its contractors, DOE O 440.1 provides specific requirements applicable only to construction activities. The intent of these construction-specific requirements is to compel the proactive management of construction safety on a project-by-project basis and, to the greatest extent possible, integrate the management of safety and health, both in terms of project personnel and management methodologies, with the management of the other primary elements of construction project performance: quality, cost and schedule

  19. Assessing problem-solving skills in construction education with the virtual construction simulator

    Science.gov (United States)

    Castronovo, Fadi

    The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on

  20. The innovation of nuclear science and technology supporting for the central plains economic zone construction

    International Nuclear Information System (INIS)

    Yang Xiaowei

    2014-01-01

    This paper discusses the nuclear agronomy support for the central plains economic zone construction, radiation chemical new material support for the central plains economic zone construction, nuclear medical support for the central plains economic zone construction, nuclear instrument and meter industry support for the central plains economic zone construction and the development trend of related disciplines. (author)

  1. Critical analysis of procurement techniques in construction management sectors

    Science.gov (United States)

    Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad

    2018-04-01

    Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.

  2. Project and Production Management in the Construction Industry

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.

  3. An Overview of Total Quality Management (TQM) practice in Construction Sector

    Science.gov (United States)

    Likita, A. J.; Zainun, N. Y.; Rahman, I. Abdul; Awal, A. S. M. Abdul; Alias, A. R.; Rahman, M. Q. Abdul; Ghazali, F. E. Mohamed

    2018-04-01

    In construction sector TQM can be termed as a philosophy which guides construction professionals on the proper execution of construction projects in terms of quality. The aim of this paper is to discuss on quality management practice in construction sector. This paper evaluated five previous researches and the findings were discussed to find a conclusion of TQM practise in construction sector. The study found that TQM had been successfully practice in construction sector at Saudi Arabia, India, US and South Africa. Application of Artificial Neural Network (ANN) help to improve the implementation of TQM in construction sector. In conclusion, quality management practices will give better control of processes in construction sector.

  4. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  5. Assessment of supply chain management in Nigerian construction ...

    African Journals Online (AJOL)

    This paper on assessment of supply Chain Management (SCM) in Effective Project ... in Imo state focused on identifying the challenges of construction supply chain ... and diverse objective were ranked highest whereas unfair risk allocation and poor ... The study recommends that construction stakeholders should embrace ...

  6. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    Science.gov (United States)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  7. Development of a Prototype Web-Based Decision Support System for Watershed Management

    Directory of Open Access Journals (Sweden)

    Dejian Zhang

    2015-02-01

    Full Text Available Using distributed hydrological models to evaluate the effectiveness of reducing non-point source pollution by applying best management practices (BMPs is an important support to decision making for watershed management. However, complex interfaces and time-consuming simulations of the models have largely hindered the applications of these models. We designed and developed a prototype web-based decision support system for watershed management (DSS-WMRJ, which is user friendly and supports quasi-real-time decision making. DSS-WMRJ is based on integrating an open-source Web-based Geographical Information Systems (Web GIS tool (Geoserver, a modeling component (SWAT, Soil and Water Assessment Tool, a cloud computing platform (Hadoop and other open source components and libraries. In addition, a private cloud is used in an innovative manner to parallelize model simulations, which are time consuming and computationally costly. Then, the prototype DSS-WMRJ was tested with a case study. Successful implementation and testing of the prototype DSS-WMRJ lay a good foundation to develop DSS-WMRJ into a fully-fledged tool for watershed management. DSS-WMRJ can be easily customized for use in other watersheds and is valuable for constructing other environmental decision support systems, because of its performance, flexibility, scalability and economy.

  8. Decision support model for selecting and evaluating suppliers in the construction industry

    Directory of Open Access Journals (Sweden)

    Fernando Schramm

    2012-12-01

    Full Text Available A structured evaluation of the construction industry's suppliers, considering aspects which make their quality and credibility evident, can be a strategic tool to manage this specific supply chain. This study proposes a multi-criteria decision model for suppliers' selection from the construction industry, as well as an efficient evaluation procedure for the selected suppliers. The model is based on SMARTER (Simple Multi-Attribute Rating Technique Exploiting Ranking method and its main contribution is a new approach to structure the process of suppliers' selection, establishing explicit strategic policies on which the company management system relied to make the suppliers selection. This model was applied to a Civil Construction Company in Brazil and the main results demonstrate the efficiency of the proposed model. This study allowed the development of an approach to Construction Industry which was able to provide a better relationship among its managers, suppliers and partners.

  9. Predicting Chinese human resource managers' strategic competence : roles of identity, career variety, organizational support and career adaptability.

    OpenAIRE

    Guan, Y.; Yang, W.; Zhou, X.; Tian, Z.; Eves, A.

    2016-01-01

    Based on career construction theory, the predictors of human resource managers' strategic competence in the Chinese context were examined. Results from a survey administered to Chinese HR managers (N = 220) showed that professional identification, career variety and organizational support for strategic human resource management positively predicted Chinese human resource managers' strategic competence. In addition, career adaptability served as a significant mediator for the above relations. ...

  10. Higher Education Change and Its Managers: Alternative Constructions

    Science.gov (United States)

    Hotho, Sabine

    2013-01-01

    This article is based on a case study conducted in the context of UK higher education change. The article argues that "change" is a construct created in discourses of change policy and change management, and resulting in reductivist change management discourses which may impede rather than facilitate effective change management in the…

  11. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  12. Management of waste from packaging of construction materials in building construction works

    OpenAIRE

    González Pericot, Natalia; Río Merino, Mercedes del

    2011-01-01

    Every material arriving at the construction site comes protected in some type of packaging, fundamentally cardboard, plastic or wood, and presently the great majority of these packagings finish in a container mixed with the rest of waste of the construction work. The increasing tendency to use prefabricated materials increases the volume of packaging necessary in product transport; in addition, the traditional materials also arrive more protected with packaging. A specific management for ...

  13. Construction of self-supporting cylindrical multiwire proportional chambers

    International Nuclear Information System (INIS)

    Kobayashi, Masaaki; Fujitani, Takeo; Omori, Tsunehiko; Sugimoto, Shojiro; Yamaguchi, Yoshitake; Nakagawa, Yuji; Wada, Toshiaki.

    1984-08-01

    Cylindrical MWPC's have been constructed with 240-430 mm in anode diameter and 750 mm in length. They are supported by inner and outer cathode cylinders made of approximately 6 mm thick aramid fibre/phenolic resin honeycomb, sandwiched between 50 μm thick Kapton sheets with or without Cu strips laminated to them. The chambers have been successfully used throughout the E68(P-barPC) experiment at the KEK 12 GeV Proton Synchrotrons. Constructional details are described. (author)

  14. Potential and Benefits of Building Information Modeling (BIM During Pre-Construction, Construction and Post Construction Stage

    Directory of Open Access Journals (Sweden)

    Aw Nien Wei

    2017-11-01

    Full Text Available The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology currently used in the construction industry is the AutoCAD (Automatic computeraided design. AutoCAD is a commercial software application for 2D and 3D computer-aided design (CAD and drafting develop by Autodesk. Generally, all the drawing design from Autocad will be exchanged among the stakeholder in the form of paper. Information exchanged among them mostly involves a lot of documents and drawings. This practice creates errors because of documents and drawings are mostly in a paper-based format that is not properly managed which results in miscommunication among them. Having wrong information in the construction process could hinder the productivity of projects because in a construction project information is one of the important construction materials. Building Information Modeling (BIM is one of the newly software in the architecture, engineering, and construction (AEC industries to ensure all parties receive the right information. BIM technology is also an intelligent model of a building constructed digitally in the way of 3D. The software will generate model containing the information needed to support the construction, fabrication, and procurement activities that needed to realize the building. This paper will discuss on potential and benefits of BIM during pre-construction stage, construction stage and during post construction stage

  15. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. Plant Engineering and Construction System with Knowledge Management: A Case Study in NPP Construction in Hitachi-GE NE

    International Nuclear Information System (INIS)

    Mochida, T.; Hamamoto, M.; Nakamitsu, N.

    2016-01-01

    Full text: Hitachi-GE Nuclear Energy, Ltd. (HGNE) has more than 40 years BWR plants construction experience. The company continues to develop plant engineering system and plant construction systems based on the experience and the lessons learned. Currently, these systems are integrated in a variety of knowledge bases using the latest information technology (IT). Their performance is continuously validated in the recent NPP constructions. Typical examples are shown as case studies for knowledge management. These plant engineering and construction management systems are essential to achieve the on-time and on-budget-goals in NPP construction projects. (author

  17. Risk management in the construction industry: a new literature review

    Directory of Open Access Journals (Sweden)

    Renault Berenger Y.

    2016-01-01

    Full Text Available The construction industry is well known as a highly risk prone industry owing to the complexity of its activities and dynamic project environments generating an atmosphere of risks that must be taken into consideration in the decision process. For this reason, we have developed this treatise to elucidate the fundamentals of risk management through a concise new proposal of literature review for risk management in construction. Our explanation of this is venture is that over the years, this area has been acknowledged as a crucial process in the business institutions and the most discussed subject among experts and researchers in the construction sector. We have tried in this report to present the most recent studies considering the impossibility to present all definitions of the concept of risk. This study is mainly a literature review; it looks at the literature relating to the concept of risk, risk management in construction as well as methods used in construction industry.

  18. Occupational health management system: A study of expatriate construction professionals.

    Science.gov (United States)

    Chan, I Y S; Leung, M Y; Liu, A M M

    2016-08-01

    Due to its direct impact on the safety and function of organizations, occupational health has been a concern of the construction industry for many years. The inherent complexity of occupational health management presents challenges that make a systems approach essential. From a systems perspective, health is conceptualized as an emergent property of a system in which processes operating at the individual and organizational level are inextricably connected. Based on the fundamental behavior-to-performance-to-outcome (B-P-O) theory of industrial/organizational psychology, this study presents the development of an I-CB-HP-O (Input-Coping Behaviors-Health Performance-Outcomes) health management systems model spanning individual and organizational boundaries. The model is based on a survey of Hong Kong expatriate construction professionals working in Mainland China. Such professionals tend to be under considerable stress due not only to an adverse work environment with dynamic tasks, but also the need to confront the cross-cultural issues arising from expatriation. A questionnaire was designed based on 6 focus groups involving 44 participants, and followed by a pilot study. Of the 500 questionnaires distributed in the main study, 137 valid returns were received, giving a response rate of 27.4%. The data were analyzed using statistical techniques such as factor analysis, reliability testing, Pearson correlation analysis, multiple regression modeling, and structural equation modeling. Theories of coping behaviors and health performance tend to focus on the isolated causal effects of single factors and/or posits the model at single, individual level; while industrial practices on health management tend to focus on organizational policy and training. By developing the I-CB-HP-O health management system, incorporating individual, interpersonal, and organizational perspectives, this study bridges the gap between theory and practice while providing empirical support for a

  19. Effectiveness of Quality Management System (QMS) on Construction Projects

    OpenAIRE

    Behnam Neyestani

    2016-01-01

    Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...

  20. Effectiveness of Practicing Supply Chain Management in Construction Site

    Directory of Open Access Journals (Sweden)

    Mamter S.

    2014-01-01

    Full Text Available Construction Supply chain management comprised of the network of organization involved in the different processes and activities which produce the material, components and services that come together to design, procurement and deliver a building. It also consists of different organizations involved in the construction process including client/owner, designer, contractor, subcontractor and suppliers. This paper shall present on the implementation of supply chain management in construction and the effectiveness of practicing SCM in construction site. A field study is done from the viewpoint of contractor and consultant then analysed by using average index methods and presented in a statistical analysis. From the analysis, it reveals that effectiveness of practicing the SCM give a lot of good performances and granted benefits to contractor. The statistical analysis produced first ranking effectiveness of SCM is can minimize waste of material and labor for construction project.

  1. An appraisal of construction management practice in Nigeria | Ugwu ...

    African Journals Online (AJOL)

    An appraisal of construction management practice in Nigeria. ... 108 questionnaires were distributed to the key construction actors as follows: 45 to ... conflicting design information, effective co-ordination of resources, critical path method, ...

  2. Decision support for emergency management

    International Nuclear Information System (INIS)

    Andersen, V.

    1989-05-01

    A short introduction will be given to the Nordic project ''NKA/INF: Information Technology for Accident and Emergency Management'', which is now in its final phase. To perform evaluation of the project, special scenarious have been developed, and experiments based on these will be fulfilled and compared with experiments without use of the decision support system. Furthermore, the succeeding European project, ''IT Support for Emergency Management - ISEM'', with the purpose of developing a decision support system for complex and distributed decision making in emergency management in full scale, will be described and the preliminary conceptual model for the system will be presented. (author)

  3. Strengthening of nuclear power plant construction safety management

    International Nuclear Information System (INIS)

    Yu Jun

    2012-01-01

    The article describes the warning of the Fukushima nuclear accident, and analyzes the major nuclear safety issues in nuclear power development in China, problems in nuclear power plants under construction, and how to strengthen supervision and management in nuclear power construction. It also points out that the development of nuclear power must attach great importance to the safety, and nuclear power plant construction should strictly implement the principle of 'safety first and quality first'. (author)

  4. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  5. Life cycle assessment of construction and demolition waste management

    DEFF Research Database (Denmark)

    Butera, Stefania; Christensen, Thomas Højlund; Astrup, Thomas Fruergaard

    2015-01-01

    Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed...... of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most...... of the impact assessment was critical for modelling the leaching impacts. Compared with the overall life cycle of building and construction materials, leaching emissions were shown to be potentially significant for toxicity impacts, compared with contributions from production of the same materials, showing...

  6. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  7. Implementation of Risk Management in Malaysian Construction Industry: Case Studies

    OpenAIRE

    Abdul-Rahman, Hamzah; Wang, Chen; Sheik Mohamad, Farhanim

    2015-01-01

    Construction industries are exposed to wide array of risks, such as financial, design, and contractual ones, which might have a direct impact on their performance toward achieving the desired objectives. Risk Management is a proactive decision-making process used to minimize and manage the risks in the most efficient and appropriate manner. However, most construction firms in Malaysia do not apply formal risk management in their projects. Thus, this study aims to identify the actual process o...

  8. The Platform Architecture and Key Technology of Cloud Service that Support Wisdom City Management

    Directory of Open Access Journals (Sweden)

    Liang Xiao

    2013-05-01

    Full Text Available According to the new requirement of constructing “resource sharing and service on demand” wisdom city system, this paper put forward the platform architecture of cloud service for wisdom city management which support IaaS, PaaS and SaaS three types of service model on the basis of researching the operation mode of the wisdom city which under cloud computing environment and through the research of mass storing technology of cloud data, building technology of cloud resource pool, scheduling management methods and monitoring technology of cloud resource, security management and control technology of cloud platform and other key technologies. The platform supports wisdom city system to achieve business or resource scheduling management optimization and the unified and efficient management of large-scale hardware and software, which has the characteristics of cross-domain resource scheduling, cross-domain data sharing, cross-domain facilities integration and cross-domain service integration.

  9. Decision Support System for Reservoir Management and Operation in Africa

    Science.gov (United States)

    Navar, D. A.

    2016-12-01

    Africa is currently experiencing a surge in dam construction for flood control, water supply and hydropower production, but ineffective reservoir management has caused problems in the region, such as water shortages, flooding and loss of potential hydropower generation. Our research aims to remedy ineffective reservoir management by developing a novel Decision Support System(DSS) to equip water managers with a technical planning tool based on the state of the art in hydrological sciences. The DSS incorporates a climate forecast model, a hydraulic model of the watershed, and an optimization model to effectively plan for the operation of a system of cascade large-scale reservoirs for hydropower production, while treating water supply and flood control as constraints. Our team will use the newly constructed hydropower plants in the Omo Gibe basin of Ethiopia as the test case. Using the basic HIDROTERM software developed in Brazil, the General Algebraic Modeling System (GAMS) utilizes a combination of linear programing (LP) and non-linear programming (NLP) in conjunction with real time hydrologic and energy demand data to optimize the monthly and daily operations of the reservoir system. We compare the DSS model results with the current reservoir operating policy used by the water managers of that region. We also hope the DSS will eliminate the current dangers associated with the mismanagement of large scale water resources projects in Africa.

  10. High-rise construction in the Russian economy: modeling of management decisions

    Science.gov (United States)

    Miroshnikova, Tatyana; Taskaeva, Natalia

    2018-03-01

    The growth in the building industry, particularly in residential high-rise construction, is having considerable influence on the country's economic development. The scientific hypothesis of the research is that the execution of town-planning programs of high-rise construction depends to a large extent on the management of the provision of material resources for the construction of a millionth city, while the balance model is the most important tool for establishing and determining the ratio between supply and demand for material resources. In order to improve the efficiency of high-rise building management, it is proposed to develop a methodology for managing the provision of construction of large cities with material resources.

  11. Evaluating environmental impacts of alternative construction waste management approaches using supply-chain-linked life-cycle analysis.

    Science.gov (United States)

    Kucukvar, Murat; Egilmez, Gokhan; Tatari, Omer

    2014-06-01

    Waste management in construction is critical for the sustainable treatment of building-related construction and demolition (C&D) waste materials, and recycling of these wastes has been considered as one of the best strategies in minimization of C&D debris. However, recycling of C&D materials may not always be a feasible strategy for every waste type and therefore recycling and other waste treatment strategies should be supported by robust decision-making models. With the aim of assessing the net carbon, energy, and water footprints of C&D recycling and other waste management alternatives, a comprehensive economic input-output-based hybrid life-cycle assessment model is developed by tracing all of the economy-wide supply-chain impacts of three waste management strategies: recycling, landfilling, and incineration. Analysis results showed that only the recycling of construction materials provided positive environmental footprint savings in terms of carbon, energy, and water footprints. Incineration is a better option as a secondary strategy after recycling for water and energy footprint categories, whereas landfilling is found to be as slightly better strategy when carbon footprint is considered as the main focus of comparison. In terms of construction materials' environmental footprint, nonferrous metals are found to have a significant environmental footprint reduction potential if recycled. © The Author(s) 2014.

  12. The management of social problems talk in a support group

    Directory of Open Access Journals (Sweden)

    Andrezza Gomes Peretti

    2013-01-01

    Full Text Available The comprehension of the health-disease process from a multifactorial perspective has allowed important transformations in the healthcare practices. In this article, we discuss the use of the support group as a resource for mental health care, analyzing how conversations about social issues are managed in this context. Based on contributions from the social constructionist movement, we analyzed the transcripts of the conversations developed in meetings of a support group offered to patients of a mental health outpatient clinic. The analysis of the process of meaning making indicates that the discourse of the social influence on mental health is not legitimized, due to a predominant individualistic discourse, which psychologizes care and is centered on the emotional analysis of the problems of the quotidian. We argue that this mode of management brings limits to the construction of the group as a device for promoting autonomy and encouraging the social transformation processes.

  13. Lean construction management the Toyota way

    CERN Document Server

    Gao, Shang

    2014-01-01

    The book presents a mixed research method adopted to assess and present the Toyota Way practices within construction firms in general and for firms in China specifically. The results of an extensive structured questionnaire survey based on the Toyota Way-styled attributes identified were developed, and data collected from building professionals working in construction firms is presented. The quantitative data presented in the book explains the status quo of the Toyota Way-styled practices implemented in the construction industry, as well as the extent to which these attributes were perceived for lean construction management. The book highlights all the actionable attributes derived from the Toyota Way model appreciated by the building professionals, but alerts the readers that some attributes felled short of implementation. Further findings from in-depth interviews and case studies are also presented in the book to provide to readers an understanding how these Toyota Way practices can be implemented in real-l...

  14. The context of innovation management in construction firms

    NARCIS (Netherlands)

    Hartmann, Andreas

    2006-01-01

    Conscious management of innovation in construction firms is becoming more and more a necessity. However, the possibilities and ways to successfully put an innovative idea into practice depend on a range of contingencies. A framework of innovation management was devised to structure the context

  15. A Proposal of a Method to Measure and Evaluate the Effect to Apply External Support Measures for Owners by Construction Management Method, etc

    Science.gov (United States)

    Tada, Hiroshi; Miyatake, Ichiro; Mouri, Junji; Ajiki, Norihiko; Fueta, Toshiharu

    In Japan, various approaches have been taken to ensure the quality of public works or to support the procurement regime of the governmental agencies, as a means to utilize external resources, which include the procurement support service or the construction management (CM) method. Although discussions on these measures to utilize external resources (hereinafter referred to as external support measure) have been going on, as well as the follow-up surveys showing the positive effects of such measures have been conducted, the surveys only deal with the matters concerning the overall effects of the external support measure on the whole, meaning that the effect of each item of the tasks have not been addressed, and that the extent it dealt with the expectations of the client is unknown. However, the effective use of the external support measure in future cannot be achieved without knowing what was the purpose to introduce the external support measure, and what effect was expected on each task item, and what extent the expectation fulfilled. Furthermore, it is important to clarify not only the effect as compared to the client's expectation (performance), but also the public benefit of this measure (value improvement). From this point of view, there is not an established method to figure out the effect of the client's measure to utilize external resources. In view of this background, this study takes the CM method as an example of the external support measure, and proposes a method to measure and evaluate the effect by each task item, and suggests the future issues and possible responses, in the aim of contributing the promotion, improvement, and proper implementation of the external support measures in future.

  16. Conflict management style, supportive work environments and the experience of work stress in emergency nurses.

    Science.gov (United States)

    Johansen, Mary L; Cadmus, Edna

    2016-03-01

    To examine the conflict management style that emergency department (ED) nurses use to resolve conflict and to determine whether their style of managing conflict and a supportive work environment affects their experience of work stress. Conflict is a common stressor that is encountered as nurses strive to achieve patient satisfaction goals while delivering quality care. How a nurse perceives support may impact work stress levels and how they deal with conflict. A correlational design examined the relationship between supportive work environment, and conflict management style and work stress in a sample of 222 ED nurses using the expanded nurse work stress scale; the survey of perceived organisational support; and the Rahim organisational conflict inventory-II. Twenty seven percent of nurses reported elevated levels of work stress. A supportive work environment and avoidant conflict management style were significant predictors of work stress. Findings suggest that ED nurses' perception of a supportive work environment and their approach to resolving conflict may be related to their experience of work stress. Providing opportunities for ED nurses in skills training in constructive conflict resolution may help to reduce work stress and to improve the quality of patient care. © 2015 John Wiley & Sons Ltd.

  17. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  18. Analysing the disposal of non-conformance in support and hunger design from the view of quality management

    International Nuclear Information System (INIS)

    Zhu Jianjun

    2008-01-01

    A serious non-conformance in the support and hunger design was found during the construction stage in a nuclear power project. In the view of quality management, the origin for the non-conformance is that the design process was not controlled properly and the design result was given without validation. Several experiences are summarized, such as the enhancement of the management level for various leaders and quality consciousness for all staff, the improvement of process management and training scheme, and paying more attention to the communication with the purchaser and the informationization construction in the design work, to ensure the traceability of the design and development. (author)

  19. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  20. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  1. Occupational safety and health management in the construction industry: a review.

    Science.gov (United States)

    Jaafar, Mohd Hafiidz; Arifin, Kadir; Aiyub, Kadaruddin; Razman, Muhammad Rizal; Ishak, Muhammad Izzuddin Syakir; Samsurijan, Mohamad Shaharudin

    2017-09-11

    The construction industry plays a significant role in contributing to the economy and development globally. During the process of construction, various hazards coupled with the unique nature of the industry contribute to high fatality rates. This review refers to previous published studies and related Malaysian legislation documents. Four main elements consisting of human, worksite, management and external elements which cause occupational accidents and illnesses were identified. External and management elements are the underlying causes contributing to occupational safety and health (OSH), while human and worksite elements are more apparent causes of occupational accidents and illnesses. An effective OSH management approach is required to contain all hazards at construction sites. An approach to OSH management constructed by elements of policy, process, personnel and incentive developed in previous work is explored. Changes to the sub-elements according to previous studies and the related Malaysian legislation are also covered in this review.

  2. Preliminary study on enhancing waste management best practice model in Malaysia construction industry

    Science.gov (United States)

    Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul

    2017-08-01

    Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.

  3. Managers' social support: Facilitators and hindrances for seeking support at work.

    Science.gov (United States)

    Lundqvist, Daniel; Fogelberg Eriksson, Anna; Ekberg, Kerstin

    2018-01-01

    Previous research has shown that social support is important for health and performance at work, but there is a lack of research regarding managers' social support at work, and if it needs to be improvedOBJECTIVE:To investigate managers' perception of work-related social support, and facilitators and hindrances that influence their seeking of social support at work. Semi-structured interviews with sixty-two managers in two Swedish organizations. Work-related support, which strengthened their managerial image of being competent, was sought from sources within the workplace. Sensitive and personal support, where there was a risk of jeopardizing their image of being competent, was sought from sources outside the workplace. Access to arenas for support (location of the workplace, meetings, and vocational courses) and the managerial role could facilitate their support-seeking, but could also act as hindrances. Because attending different arenas for support were demanding, they refrained from seeking support if the demands were perceived as too high. Different supportive sources are distinguished based on what supportive function they have and in which arenas they are found, in order to preserve the confidence of the closest organization and to maintain the image of being a competent and performing manager.

  4. Investigating factors influencing construction waste management efforts in developing countries: an experience from Thailand.

    Science.gov (United States)

    Manowong, Ektewan

    2012-01-01

    Rapid economic growth and urbanization in developing countries lead to extensive construction activities that generate a large amount of waste. A challenge is how to manage construction waste in the most sustainable way. In the developing world, research on construction waste management is scarce and such academic knowledge needs to be responsive to actual practices in the industry in order to be implemented. As construction projects involve a number of participants and stakeholders, their participation and commitment can have a major influence on the goals of green and sustainable construction for urban development. This study provides a significant step in conducting a very first research of this kind in Thailand by aiming to investigate the level of construction stakeholders' commitment as well as the achievement of construction waste management in order to improve short-term practices and to establish a long-term strategic construction waste management plan. In this study, a structural equation model was employed to investigate the influence of factors that are related to environmental aspects, social aspects, and economic aspect of construction waste management. Concern about health and safety was found to be the most significant and dominant influence on the achievement of sustainable construction waste management. Other factors affecting the successful management of construction waste in Thai construction projects were also identified. It is perceived that this study has potential to contribute useful guidelines for practitioners both in Thailand and other developing countries with similar contexts.

  5. Construction management research at the interface of design and explanatory science

    NARCIS (Netherlands)

    Voordijk, Johannes T.

    2011-01-01

    Purpose – The purpose of this study is to characterize construction management research at the interface of explanatory science and design science. Design/methodology/approach – The dual nature of construction management research is analyzed by relating this field of research to natural science,

  6. 20th International Symposium on Advancement of Construction Management and Real Estate

    CERN Document Server

    Zheng, Sheng; Luo, Jiaojiao; Wang, Wei; Mo, Zhibin; Shan, Liping

    2017-01-01

    These conference proceedings offer an outstanding resource for academics and professionals, sharing essential findings on the latest developments in real estate and construction management. The subject is “Advancement of Construction Management and Real Estate” in the context of new-type urbanization. The Chinese Research Institute of Construction Management (CRIOCM), working in close collaboration with Zhejiang University, organized CRIOCM2015, the 20th International Symposium. Written by academics and professionals from all over the world, these proceedings discuss the latest achievements, research outputs and advances between frontier disciplines in the field of construction management and real estate. They cover a wide range of topics, including new-type urbanization, land development and land use, urban development and management, the real estate market and housing policies. The discussions will provide an important reference source on the implementation of new-type urbanization in China and abroad.

  7. Introduction of construction management system for preparation work of Shimane Nuclear Power Station Unit-3

    International Nuclear Information System (INIS)

    Sasaki, Yutaka; Tsumura, Isamu; Hayashi, Minoru; Nakamoto, Kenji

    2005-01-01

    The construction management system aims to have information on the construction management between the Chugoku Electric Power Co. Inc. and each contractor, and to work efficiently. The system has been operating during about half year. The system manages the manufacturing process, safety and quality. The aims, development process, characteristics, network construction of the system are reported. As outline of the construction management system, functions and construction management of each process, safety and quality and ITV camera are explained. The system will be used at construction of Shimane nuclear power station unit-3. (S.Y.)

  8. Stress Management: Social Support

    Science.gov (United States)

    Healthy Lifestyle Stress management Having close friends and family has far-reaching benefits for your health. Here's how to build and maintain these ... article: http://www.mayoclinic.org/healthy-lifestyle/stress-management/in-depth/social-support/art-20044445 . Mayo Clinic ...

  9. Needs Assessment--A Construction Management Bachelor of Science Degree in Alaska.

    Science.gov (United States)

    Gunderson, D. E.; Ra, J. W.; Schroeder, H.; Holland, H. R.

    2002-01-01

    Responses from 99 Alaskan contractors identified the number of entry-level construction management personnel needed, salaries, and desired skills. Skills identified will be used to develop a construction management curriculum specific to the Alaskan environment. Findings correlate with research predicting supply and demand for graduates nationwide…

  10. Watershed Management Optimization Support Tool (WMOST) ...

    Science.gov (United States)

    EPA's Watershed Management Optimization Support Tool (WMOST) version 2 is a decision support tool designed to facilitate integrated water management by communities at the small watershed scale. WMOST allows users to look across management options in stormwater (including green infrastructure), wastewater, drinking water, and land conservation programs to find the least cost solutions. The pdf version of these presentations accompany the recorded webinar with closed captions to be posted on the WMOST web page. The webinar was recorded at the time a training workshop took place for EPA's Watershed Management Optimization Support Tool (WMOST, v2).

  11. Research on information models for the construction schedule management based on the IFC standard

    Directory of Open Access Journals (Sweden)

    Weirui Xue

    2015-05-01

    Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

  12. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  13. An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2018-06-01

    Full Text Available The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.

  14. Welcoming high reliability organising in construction management

    NARCIS (Netherlands)

    olde Scholtenhuis, Léon Luc; Doree, Andries G.; Smith, S.D.; Ahiaga-Dagbui, D.D.

    2013-01-01

    To achieve project objectives, construction project managers have to manoeuvre through complex coordination structures. They have to simultaneously deal with limited budgets, tight schedules, demanding stakeholders and a fragmented supply-chain. Despite their extensive coordination efforts, project

  15. HSE management for AP1000 nuclear plant construction in EPC mode

    International Nuclear Information System (INIS)

    He Xiaogang; Wei Zhong

    2010-01-01

    As a new nuclear type, AP1000 will become the development direction of Chinese nuclear project. EPC General Contract mode is favored by nuclear owners both at home and abroad. Therefore, there is necessity for studying HSE management system and method suitable for AP1000 nuclear plant construction (ANPC) based on combination of AP1000 construction characters in EPC mode. This can not only ensure safety for ANPC but also positively promote national nuclear power development. For this reason, based on site HSE management of the first AP1000 nuclear plant under construction, HSE management system and method for ANPC in EPC mode was proposed after analysis of the character of EPC mode and ANPC character. It is hoped that it will be helpful for safe construction for ANPC. (authors)

  16. Logistic description of investment and construction management

    Directory of Open Access Journals (Sweden)

    Sborshchikov Sergey Borisovich

    2014-01-01

    Full Text Available The article is devoted to the questions of defining dynamic behavior of investment and construction activity as a technical and economic system and its formalized description. It is offered to use the term "condition vector" as one of the main characteristics while describing investment and construction activity. Logistic interpretation of a sustainable development of investment and construction defines the concept of optimum trajectory, which considers various dependencies of its components (construction operations, their preparation, design, material, technique, personnel, information, investment, etc.. It is necessary to point out that this state is homeostatic, which means, the managing system must provide continuous monitoring of each system component of investment and construction activities in accordance with the sustainable development pathway. The concept of dynamic balance used in logistics is identical to the concept of homeostatic balance, which is accepted in system engineering. It is defined as a property of technical and economic system, which implies that its deviations from the development pathway lie within admissible values.

  17. Improvement of the material and transport component of the system of construction waste management

    Science.gov (United States)

    Kostyshak, Mikhail; Lunyakov, Mikhail

    2017-10-01

    Relevance of the topic of selected research is conditioned with the growth of construction operations and growth rates of construction and demolition wastes. This article considers modern approaches to the management of turnover of construction waste, sequence of reconstruction or demolition processes of the building, information flow of the complete cycle of turnover of construction and demolition waste, methods for improvement of the material and transport component of the construction waste management system. Performed analysis showed that mechanism of management of construction waste allows to increase efficiency and environmental safety of this branch and regions.

  18. MATES in Construction: Impact of a Multimodal, Community-Based Program for Suicide Prevention in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Graham Martin

    2011-11-01

    Full Text Available A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention; gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010 are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers.

  19. MATES in Construction: Impact of a Multimodal, Community-Based Program for Suicide Prevention in the Construction Industry

    Science.gov (United States)

    Gullestrup, Jorgen; Lequertier, Belinda; Martin, Graham

    2011-01-01

    A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention); gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST) training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010) are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers. PMID:22163201

  20. Construction Of A Performance Assessment Model For Zakat Management Institutions

    Directory of Open Access Journals (Sweden)

    Sri Fadilah

    2016-12-01

    Full Text Available The objective of the research is to examine the performance evaluation using Balanced Scorecard model. The research is conducted due to a big gap existing between zakat (alms and religious tax in Islam with its potential earn of as much as 217 trillion rupiahs and the realization of the collected zakat fund that is only reached for three trillion. This indicates that the performance of zakat management organizations in collecting the zakat is still very low. On the other hand, the quantity and the quality of zakat management organizations have to be improved. This means the performance evaluation model as a tool to evaluate performance is needed. The model construct is making a performance evaluation model that can be implemented to zakat management organizations. The organizational performance with Balanced Scorecard evaluation model will be effective if it is supported by three aspects, namely:  PI, BO and TQM. This research uses explanatory method and data analysis tool of SEM/PLS. Data collecting technique are questionnaires, interviews and documentation. The result of this research shows that PI, BO and TQM simultaneously and partially gives a significant effect on organizational performance.

  1. Ontologies to Support RFID-Based Link between Virtual Models and Construction Components

    DEFF Research Database (Denmark)

    Sørensen, Kristian Birch; Christiansson, Per; Svidt, Kjeld

    2010-01-01

    the virtual models and the physical components in the construction process can improve the information handling and sharing in construction and building operation management. Such a link can be created by means of Radio Frequency Identification (RFID) technology. Ontologies play an important role...

  2. Collaborative Management of Complex Major Construction Projects: AnyLogic-Based Simulation Modelling

    Directory of Open Access Journals (Sweden)

    Na Zhao

    2016-01-01

    Full Text Available Complex supply chain system collaborative management of major construction projects effectively integrates the different participants in the construction project. This paper establishes a simulation model based on AnyLogic to reveal the collaborative elements in the complex supply chain management system and the modes of action as well as the transmission problems of the intent information. Thus it is promoting the participants to become an organism with coordinated development and coevolution. This study can help improve the efficiency and management of the complex system of major construction projects.

  3. Efficiency potential of management and technical solutions for a construction object

    Directory of Open Access Journals (Sweden)

    Lapidus Azariy Abramovich

    2014-01-01

    Full Text Available The authors investigate the models of efficiency potential of management and technical solutions for a construction object, which allows accounting for the influence of management-technological and administrative solutions in the process of implementing construction project. The solutions are represented by various factors – solitary integral potentials. The factors, which should be taken into account in the process of developing an integral model, are: development of general contracting structure, project decisions, management decisions, administrative decisions and ecological impact. In is necessary to develop the model, which will integrally put together the above mentioned factors of a construction project, observe and investigate other factors, create a model and get the opportunity not only to predict the endpoint of the future construction object on the stage of formulating technological requirements, but also to monitor the changes of this prognosis in time. The parameters of the integral potential will allow the system to obtain flexibility, which makes it possible to adjust to the changes usually taking place on a construction object and at the same time to aim for optimization of organizational, technological and administrative solutions in the process of reaching endpoint of construction.

  4. A Decision Support Concept for a construction design project – selecting the type of glass façade

    Directory of Open Access Journals (Sweden)

    Franjo Šimić

    2017-01-01

    Full Text Available The paper describes research into the possibility of developing a concept for supporting decisions in planning construction projects (one of the most important stages of construction project management. The focus is on supporting decisions in selecting the type of and solution for the glass façade in the main design. Materials and types of soluteons for a glass façade were analyzed and alternative solutions were obtained. The concept was developed in that it included relevant stakeholders in the decision-making process during the construction design. These stakeholders were the investor, architect, and construction contractor. The analysis was carried out and a hierarchical structure of objectives was formed as a goal tree. The criteria at the last hierarchical level were used to evaluate alternative solutions for the glass façade, and their weights were determined by all stakeholders using the AHP method (Analytic Hierarchy Process. Using PROMETHEE (Preference Ranking Method for Enrichment Evaluation, a comparison of alternative solutions for the glass façade was conducted and the alternatives were ranked according to the priorities for inclusion into the main design. The concept was tested by selecting a type of glass façade on a residential-commercial building in the city of Rijeka, Croatia.

  5. Construct validation of supply chain management in cooperative

    OpenAIRE

    Idris, Nurjihan; Arshad, Fatimah Mohamed; Radam, Alias; Ali, Noor Azman

    2009-01-01

    This study attempts to analyze construct in supply chain and to determine which construct contribute to performance of agricultural cooperatives in Malaysia. The primary data is collected via questionnaire from top level management of agricultural cooperatives using 5-item Likert scale. Factor analysis and structural equations modeling were used to analyze the data. Findings show that cooperatives places importance on quality and technology, logistic, supplier and governance. As a whole, supp...

  6. Managing engineering to meet construction requirements

    International Nuclear Information System (INIS)

    Martin, D.F.; Houchen, J.D.

    1976-01-01

    The San Onofre Units 2 and 3 Project schedule is compared with Bechtel's Generic Nuclear Power Plant schedule. This comparison shows that the major delays experienced on the San Onofre Project have resulted from the regulatory process. To date, Engineering has met Construction's requirements and the Project has not experienced any Engineering related delays. The San Onofre Project has been faced with many uncertainties, such as limited site area, high seismic design criteria, new and changing Federal and State regulations, shifts in supplier market conditions and unpredictable supplier performance. Each of these uncertainties has impacted the Engineering effort and jeopardized project schedule goals. The SCE-Bechtel Engineering Management team has acted to mitigate the impact of these uncertainties through use of a cost trend program, simplification of SCE-Bechtel interfaces, close Engineering-Construction coordination, the use of task forces to handle critical supplier problems and the use of additional Engineering personnel, etc. so that Construction requirements have been met

  7. Fluid management in space construction

    Science.gov (United States)

    Snyder, Howard

    1989-01-01

    The low-g fluids management group with the Center for Space Construction is engaged in active research on the following topics: gauging; venting; controlling contamination; sloshing; transfer; acquisition; and two-phase flow. Our basic understanding of each of these topics at present is inadequate to design space structures optimally. A brief report is presented on each topic showing the present status, recent accomplishings by our group and our plans for future research. Reports are presented in graphic and outline form.

  8. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  9. Probabilistic analysis in the life cycle management of construction deficiencies

    International Nuclear Information System (INIS)

    Zebroski, E.; Starr, C.

    1985-01-01

    The author discusses the urgent need for better systems and procedures for evaluating actual or suspected construction deficiencies in nuclear power plants. The following topics of interest are discussed: summary of tools available, use of plant-specific probabilistic risk assessments, general process for the rational management of construction deficiencies, rationales for the timing of required corrective actions, example of deficiency management in France, proposed screening process, deficiencies calling for corrective actions, institutional obstacles, and specific recommendations

  10. Evolutionary Game Model Study of Construction Green Supply Chain Management under the Government Intervention

    Science.gov (United States)

    Xing, Yuanzhi; Deng, Xiaoyi

    2017-11-01

    The paper first has defined the concepts of green supply chain management and evolution game theory, and pointed out the characteristics of green supply chain management in construction. The main participants and key links of the construction green supply chain management are determined by constructing the organization framework. This paper established the evolutionary game model between construction enterprises and recycling enterprises for the green supply chain closed-loop structure. The waste recycling evolutionary stability equilibrium solution is obtained to explore the principle and effective scope of government policy intervention. This paper put forward the relevant countermeasures to the green supply chain management in construction recycling stage from the government point of view. The conclusion has reference value and guidance to the final product construction enterprises, recycling enterprises and the government during green supply chain.

  11. Management self-assessment in construction phase of nuclear power station

    International Nuclear Information System (INIS)

    Shao Bixiu

    2004-01-01

    Management self-assessment is one of the quality management methods to achieve the organization's continuous improvement. Through the investigation of the methods, the author hopes to give guideline to the management at all levels involved in the construction of nuclear power station in the implementation of management self-assessment, and also to make the management self-assessment more normalized, systematical and effective

  12. On the effectiveness in implementing a waste-management-plan method in construction

    International Nuclear Information System (INIS)

    Tam, Vivian W.Y.

    2008-01-01

    The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that 'Propose methods for on-site reuse of materials' and 'Propose methods for reducing waste' are the main benefits gained from the implementation of the WMP method. However, 'Low financial incentive' and 'Increase in overhead cost' are considered as the major difficulties in the implementation. From that, 'Use of prefabricated building components' is considered as the major effective measure to encourage the implementation of the WMP method

  13. Strategies, methods and tools for managing nanorisks in construction

    Science.gov (United States)

    López de Ipiña, J. M.; Vaquero, C.; Boutry, D.; Damlencourt, J. F.; Neofytou, P.; Pilou, M.; Jankowska, E.; Larraza, I.; Pina, R.; Fernández, S.; Contreras, S.; Romero, A.; Calderon, M.; Swiezewsk, P.; Otkallo, K.; Pintea, A.; Salazar, C.; Oroz, T.; Hargreaves, B.; Ciobanu, R.; Tabrea, A.; Hazebrouck, B.; Salvi, O.; Stockmann-Juvala, H.; Vaananen, V.; Pui, D. H. Y.; Thompson, Drew

    2015-05-01

    This paper presents a general overview of the work carried out by European project SCAFFOLD (GA 280535) during its 30 months of life, with special emphasis on risk management component. The research conducted by SCAFFOLD is focused on the European construction sector and considers 5 types of nanomaterials (TiO2, SiO2, carbon nanofibres, cellulose nanofibers and nanoclays), 6 construction applications (Depollutant mortars, selfcompacting concretes, coatings, self-cleaning coatings, fire resistant panels and insulation materials) and 26 exposure scenarios, including lab, pilot and industrial scales. The document focuses on the structure, content and operation modes of the Risk Management Toolkit developed by the project to facilitate the implementation of “nano-management” in construction companies. The tool deploys and integrated approach OHSAS 18001 - ISO 31000 and is currently being validated on 5 industrial case studies.

  14. Strategies, methods and tools for managing nanorisks in construction

    International Nuclear Information System (INIS)

    De Ipiña, J M López; Vaquero, C; Boutry, D; Damlencourt, J F; Neofytou, P; Pilou, M; Jankowska, E; Larraza, I; Pina, R; Fernández, S; Contreras, S; Romero, A; Calderon, M; Swiezewsk, P; Otkallo, K; Pintea, A; Salazar, C; Oroz, T; Hargreaves, B; Ciobanu, R

    2015-01-01

    This paper presents a general overview of the work carried out by European project SCAFFOLD (GA 280535) during its 30 months of life, with special emphasis on risk management component. The research conducted by SCAFFOLD is focused on the European construction sector and considers 5 types of nanomaterials (TiO 2 , SiO 2 , carbon nanofibres, cellulose nanofibers and nanoclays), 6 construction applications (Depollutant mortars, selfcompacting concretes, coatings, self-cleaning coatings, fire resistant panels and insulation materials) and 26 exposure scenarios, including lab, pilot and industrial scales. The document focuses on the structure, content and operation modes of the Risk Management Toolkit developed by the project to facilitate the implementation of “nano-management” in construction companies. The tool deploys and integrated approach OHSAS 18001 - ISO 31000 and is currently being validated on 5 industrial case studies. (paper)

  15. MANAGEMENT OF RISKS BASED ON INTERACTION BETWEEN CONSTRUCTION EXPERT AND CUSTOMER ORGANIZATION

    Directory of Open Access Journals (Sweden)

    Александр Васильевич Харитонович

    2016-02-01

    Full Text Available The paper describes problems connected to management of risk and key characteristics of interaction of construction expert and organization-customer of expert services. We have conducted the analysis of different schemes used for management of risk, their advantages and disadvantages. In addition authors describe the main opportunities that appear in the organization as a result of the systematic engagement of an external expert at different stages of investment and construction project (getting recommendations aimed at improving of the organization adaptability to changes and risks; improving the efficiency of management of investment and construction projects etc..

  16. Building the future of healthcare. Part III: managing the build. Hospital leaders are moving forward using specialized IT tools to help them manage today's complex new-construction projects.

    Science.gov (United States)

    Lawrence, Daphne

    2010-05-01

    Hospital leaders are increasing making use of project management information systems (PMIS), which are built around documentation and communication of project-specific information. PMIS solutions are being applied to the daunting challenge of managing the large volumes of information involved in new construction projects. Project management tools usually utilize a portal. These tools can interface with administrative systems for best effect. CIOs and other senior executives emphasize that good leadership and execution are fundamental to success, and that automated project management tools are supports, not substitutes for good strategic planning and execution.

  17. Construction of test-bed system of voltage management system to ...

    African Journals Online (AJOL)

    Construction of test-bed system of voltage management system to apply physical power system. ... Journal of Fundamental and Applied Sciences ... system of voltage management system (VMS) in order to apply physical power system.

  18. Management Needs for Computer Support.

    Science.gov (United States)

    Irby, Alice J.

    University management has many and varied needs for effective computer services in support of their processing and information functions. The challenge for the computer center managers is to better understand these needs and assist in the development of effective and timely solutions. Management needs can range from accounting and payroll to…

  19. A system dynamics-based environmental performance simulation of construction waste reduction management in China.

    Science.gov (United States)

    Ding, Zhikun; Yi, Guizhen; Tam, Vivian W Y; Huang, Tengyue

    2016-05-01

    A huge amount of construction waste has been generated from increasingly higher number of construction activities than in the past, which has significant negative impacts on the environment if they are not properly managed. Therefore, effective construction waste management is of primary importance for future sustainable development. Based on the theory of planned behaviors, this paper develops a system dynamic model of construction waste reduction management at the construction phase to simulate the environmental benefits of construction waste reduction management. The application of the proposed model is shown using a case study in Shenzhen, China. Vensim is applied to simulate and analyze the model. The simulation results indicate that source reduction is an effective waste reduction measure which can reduce 27.05% of the total waste generation. Sorting behaviors are a premise for improving the construction waste recycling and reuse rates which account for 15.49% of the total waste generated. The environmental benefits of source reduction outweigh those of sorting behaviors. Therefore, to achieve better environmental performance of the construction waste reduction management, attention should be paid to source reduction such as low waste technologies and on-site management performance. In the meantime, sorting behaviors encouragement such as improving stakeholders' waste awareness, refining regulations, strengthening government supervision and controlling illegal dumping should be emphasized. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. A Bibliometric Review on Risk Management and Building Information Modeling for International Construction

    Directory of Open Access Journals (Sweden)

    Tsenguun Ganbat

    2018-01-01

    Full Text Available International construction is complicated and involves high risks. However, with the development of technological innovation, Building Information Modeling (BIM emerged and seems to be able to address certain risks. To understand BIM applications in risk management for international construction, a state-of-the-art review is required. Therefore, this paper aims to identify the research trends and opportunities for risk management in BIM-enabled international construction by reviewing 526 peer-reviewed journal articles for the years 2007–2017. Thus five steps of bibliometric analysis were conducted based on the proposed frameworks of BIM risk management in international construction (BIM-RM-INTL. The results show that the popularization of BIM not only attracts all stakeholders’ interests but also brings some risks. For example, financial factors are hard to detect and control through BIM, information loss during transmission stands out, and BIM has no unified standards and regulations for international construction. The research has mapped existing research results and their relationships for future risk management in BIM-enabled international construction.

  1. COMPARISON OF TRENDS IN RISK MANAGEMENT THEORY AND PRACTICES WITHIN THE CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Dena Crnković

    2016-12-01

    Full Text Available This study considered the problem of understanding and use of risk management methods in construction projects and their representation in the literature and their practical application. Research of trends in risk management was conducted using studies from the EBSCO database that were published in the period from 1999 to 2015. The focus included the development of two terms, namely traditional and holistic approach to risk management as well as to uncertainty and opportunity management. The trend of leading standards in the field of project management, PMBoK and ISO 31000 indicated full support for the modernization of risk management that focused on the risks as well as potential opportunities in the project. The findings also revealed that the global practices continued to lack awareness of risk management and its benefits for project goals. A similar situation was found in Croatia by observing project management practices in two case studies, namely Project Zagrebačka obala in Rijeka and a Project of SEECEL Zagreb. Primarily, the lack of education and communication between experts are important issues requiring attention in practice and academics. It is necessary to gradually introduce standards over time to prepare for progress in managing uncertainties and adopting more holistic approaches.

  2. Trend-Analysis and Research Direction in Construction Management Literature

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    Planning and scheduling, both in the form of pre-assembly construction as well as increase in cost and time are all themes that haven’t been studies in a trend-analysis, with the purpose of finding gaps and research directions in the literature. The aim of this paper is therefor to analyze...... of Construction Engineering and Management....

  3. The innovation and application of the nuclear power construction management information system MISNPC

    International Nuclear Information System (INIS)

    Wang Kaihua; Tang Zihui; Zhang Baiqi; Sun Guangwei; Zhu Guodong; Qian Fuhua

    2009-01-01

    This paper focuses on introducing the innovation achievements on the management information system of nuclear power construction (MISNPC). The innovation is achieved through summarizing the practice of nuclear power construction in China and drawing on advanced experience of international nuclear power construction. The innovation, including the management standard for nuclear power construction, the standard of construction process, the standard of nuclear-power basic codes and the standard for nuclear power construction and control, can be rapidly copied for application in various nuclear power construction projects. The application of the innovation may play an essential role in ensuring safe construction and operation of nuclear power plants in China and improving economic benefits. (authors)

  4. Construction and management of ARDS/sepsis registry with REDCap.

    Science.gov (United States)

    Pang, Xiaoqing; Kozlowski, Natascha; Wu, Sulong; Jiang, Mei; Huang, Yongbo; Mao, Pu; Liu, Xiaoqing; He, Weiqun; Huang, Chaoyi; Li, Yimin; Zhang, Haibo

    2014-09-01

    The study aimed to construct and manage an acute respiratory distress syndrome (ARDS)/sepsis registry that can be used for data warehousing and clinical research. The workflow methodology and software solution of research electronic data capture (REDCap) was used to construct the ARDS/sepsis registry. Clinical data from ARDS and sepsis patients registered to the intensive care unit (ICU) of our hospital formed the registry. These data were converted to the electronic case report form (eCRF) format used in REDCap by trained medical staff. Data validation, quality control, and database management were conducted to ensure data integrity. The clinical data of 67 patients registered to the ICU between June 2013 and December 2013 were analyzed. Of the 67 patients, 45 (67.2%) were classified as sepsis, 14 (20.9%) as ARDS, and eight (11.9%) as sepsis-associated ARDS. The patients' information, comprising demographic characteristics, medical history, clinical interventions, daily assessment, clinical outcome, and follow-up data, was properly managed and safely stored in the ARDS/sepsis registry. Data efficiency was guaranteed by performing data collection and data entry twice weekly and every two weeks, respectively. The ARDS/sepsis database that we constructed and manage with REDCap in the ICU can provide a solid foundation for translational research on the clinical data of interest, and a model for development of other medical registries in the future.

  5. Elementary Introduction to the Green Management of the Construction in Whole Process

    Science.gov (United States)

    Na), Wu Y. N.(Yun; Yu), Yan H. Y.(Hong; Jun), Huang Z. J.(Zhi

    Construction industries consume more energy resources than necessary. it is essential to establish a management system with all pollution problems resolved to construct green buildings. By applying the theory of whole life cycle, this paper divides the whole process of construction into four sub-phases, which will also be subdivided into more concrete working procedures. Based on this, a systematic framework is promoted for the green management of the construction, especially and creatively, considering the green aims as important as the traditional three aims-"quality aim, schedule aim and cost aim". This framework, adhering to the integration idea-"customers first, whole optimal", regards the green control and workflow as an organic whole in order to build green, sustainable and healthy architecture, and then provide a perfect guide and reference to the green management.

  6. End-to-end requirements management for multiprojects in the construction industry

    DEFF Research Database (Denmark)

    Wörösch, Michael

    Performance Concrete and insulation materials – is used. By means of action research and interviews of case project staff it has become evident that many elements of formalized requirements management are missing in the case project. To fill those gaps and be able to manage requirements end...... with regards to requirements management. As the literature study gives little new information, a series of interviews are initiated with experts from industry and universities. Those interviews reveal major shortcomings in the way requirements are handled in Danish construction companies today. In order...... to give managers of construction projects a useful and guiding tool for formally managing requirements that is rooted in practice, the “Conceptual requirements management framework”, is created. The framework builds upon the gathered empirical data, obtained by action research, interviews, and available...

  7. Data processing project management in the construction of plants and power stations

    International Nuclear Information System (INIS)

    Huelsen, H.; Hayen, W.

    1987-01-01

    The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de

  8. Construct Validation of the Behavior and Instructional Management Scale

    Science.gov (United States)

    Martin, Nancy K.; Sass, Daniel A.

    2010-01-01

    Beliefs related to classroom management vary among teachers and play an important role in classrooms. Despite the importance of this construct, valid measures have proven difficult to develop. This study evaluated the psychometric properties of the Behavior and Instructional Management Scale (BIMS), a short but valid measure of teachers'…

  9. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  10. Analysis of Informationization Construction of Business Financial Management under the Network Economy

    Science.gov (United States)

    Dong, Yahui; Zhang, Pengwei; Li, Wei

    To strengthen the informationization construction of the financial management has great significance to the achievement of business management informationization, and under the network economic environment, it is an important task of the financial management that how to conduct informationization construction of traditional financial management to provide true, reliable and complete financial information system for the business managers. This paper thoroughly researches the problem of financial information orientation management (FIOM) by taking the method of combining theory with practice. This paper puts forward the thinking method of financial information management, makes the new contents of E-finance. At last, this paper rebuilds the system of finance internal control from four aspects such as control of organization and management, system development control and safety control of network system.

  11. Managing Conflict in The Nigerian Construction Industry: A Study of ...

    African Journals Online (AJOL)

    The study investigated the causes of conflictin the Nigerian construction industry and, the strategies for managing them in terms of resolutions and prevention. A quantitative approach using questionnaire survey was adopted to empirically test the opinions of construction professionals on causes of conflicts and ...

  12. Managing public support during oil spills

    International Nuclear Information System (INIS)

    Zuidinga, K.; Boston, N.; Robertson, I.

    1990-01-01

    Too often oil spill contingency plans ignore and responders overlook the problem of managing auxiliary support, that is volunteers. These may consists of Native Bands, environmental organizations, community groups and the public in general. The consequences of not managing or poorly managing public support for the response effort is an increasingly frustrated public which begins to coordinate their own response efforts, proceeding without training or supervision. such a response can pose a threat to individuals as well as to the clean-up effort in general. Preparation and effective communication, particularly with the news media are key elements in successfully managing public support. In this paper the issues to be addressed are: coordination (mobilization, assignments), safety and insurance, equipment and clothing, fatigue and stress, food and shelter, training, public information including information about potential hazards, and public expectations of response efficiency

  13. Support to design and construction of the PBMR plant

    International Nuclear Information System (INIS)

    Cazorla, F.; Moron, P.; Gonzalez, J. I.

    2010-01-01

    Developing the new reactor design to a licensable state for constructing a pilot plant is a tough task require specific resources, concerning knowledge and previous experience, which trespassing the pure scientific or technologic knowledge linked to the reactor conceptual design. Taking into consideration the experience derived from the collaboration between the South African company PBMR (PTY) Ltd.; the Pebble Bed Modular Reactor Designer, and Tecnatom SA, the article presents some of the aspects in which the companies or organization in charge of the design can demand external support to license and construct the pilot plants with guaranteed success. (Author)

  14. The management of design interfaces in the nuclear power construction

    International Nuclear Information System (INIS)

    Lv Shubao

    2005-01-01

    This paper introduces the design interfaces management in the construction of nuclear power plant through the Interface Control Manual (ICM). The ICM management model had been applied and practiced in the construction of both DAYA BAY and LING AO phase I (LNPS I ) nuclear power stations. It has solved many troublesome matters in the design interfaces information exchange among all concerned parties, and contributed to these projects greatly. The author considers that the ICM management: has great value for extending and applying in the new construction of nuclear power station. In order to understand easily the ICM management model, the paper expatiates on the compiling principle, the procedure establishing, the interface editing and the ICM updating. The advantages of using ICM are as follow: First, the ICM model provides the authoritative and legal document to be obeyed by all contractors for exchanging the design technical information basing on the responsibility and planning. Second, the ICM enhances the schedule control for the project engineering. Third, using ICM to manage the design information exchange solves the questions assorted with different parties, and decreases the times spent in unproductive coordination meeting. Fourth, the ICM management uses computer database and provides convenient method for engineers to track and control interface exchange, gets twice the result with half the effort. Fifth, the ICM database allows easy retrieval of any technical information for further re-use in a similar project. (authors)

  15. Study on the Quality Management of Building Electricity Engineering Construction in the Whole Process

    Science.gov (United States)

    Qin, Minwu

    2018-05-01

    With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.

  16. Construction of APR1000 nuclear power information management system based on international standards

    International Nuclear Information System (INIS)

    Choi, Seung Hwan; Song, Deok Yong; Han, Byung Sub; An, Kyung Ik; Hwang, Jin Sang

    2010-01-01

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  17. Construction of APR1000 nuclear power information management system based on international standards

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Seung Hwan [Korea Electric Power Research Institute, Daejeon (Korea, Republic of); Song, Deok Yong; Han, Byung Sub [Enesys Co., Daejeon (Korea, Republic of); An, Kyung Ik; Hwang, Jin Sang [PartDB Co., Daejeon (Korea, Republic of)

    2010-10-15

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  18. Decision support tools to support the operations of traffic management centers (TMC)

    Science.gov (United States)

    2011-01-31

    The goal of this project is to develop decision support tools to support traffic management operations based on collected intelligent transportation system (ITS) data. The project developments are in accordance with the needs of traffic management ce...

  19. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  20. Peer Assessment for Construction Management and Quantity Surveying Students

    Directory of Open Access Journals (Sweden)

    Patricia McLaughlin

    2012-11-01

    Full Text Available Students undertaking the Bachelor of ConstructionManagement degree course at RMIT University, Melbourne,qualify for registration with the Australian Institute ofQuantity Surveyors (AIQS and the Australian Institute ofBuilding (AIB upon graduation. Over the past decade thedegree course has been constantly upgraded and altered inline with recommendations from professional bodies such asthese and other industry partners. In 1994 the Departmentof Building and Construction Economics re-assesseda range of subjects including the first year technologysubjects. Out of the review a problem-based integratedlearning unit was developed and tested. This unit has nowbeen in place for ten years.Quantity surveying and construction management likemost other professions in the construction industryrequire teamwork and advanced consultation skills. Theseskills may be learnt through experience but there isconsiderable evidence that these skills can be taught in theundergraduate years. Therefore in line with team-basedapproaches used in industry and professional constructionsettings, this year a new assessment model - peerassessment - will be applied to the problem-based learningunit. This paper describes the procedures and processesused to introduce the change and examines the theoreticalbase upon which the model was developed.

  1. Auditing of suppliers as the requirement of quality management systems in construction

    Science.gov (United States)

    Harasymiuk, Jolanta; Barski, Janusz

    2017-07-01

    The choice of a supplier of construction materials can be important factor of increase or reduction of building works costs. Construction materials present from 40 for 70% of investment task depending on kind of works being provided for realization. There is necessity of estimate of suppliers from the point of view of effectiveness of construction undertaking and necessity from the point of view of conformity of taken operation by executives of construction job and objects within the confines of systems of managements quality being initiated in their organizations. The estimate of suppliers of construction materials and subexecutives of special works is formal requirement in quality management systems, which meets the requirements of the ISO 9001 standard. The aim of this paper is to show possibilities of making use of anaudit for estimate of credibility and reliability of the supplier of construction materials. The article describes kinds of audits, that were carried in quality management systems, with particular taking into consideration audits called as second-site. One characterizes the estimate criterions of qualitative ability and method of choice of the supplier of construction materials. The paper shows also propositions of exemplary questions, that would be estimated in audit process, the way of conducting of this estimate and conditionality of estimate.

  2. Identifying the Critical Factors Affecting Safety Program Performance for Construction Projects within Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Zubair Ahmed Memon

    2013-04-01

    Full Text Available Many studies have shown that the construction industry one of the most hazardous industries with its high rates of fatalities and injuries and high financial losses incurred through work related accident. To reduce or overcome the safety issues on construction sites, different safety programs are introduced by construction firms. A questionnaire survey study was conducted to highlight the influence of the Construction Safety Factors on safety program implementation. The input from the questionnaire survey was analyzed by using AIM (Average Index Method and rank correlation test was conducted between different groups of respondents to measure the association between different groups of respondent. The finding of this study highlighted that management support is the critical factor for implementing the safety program on projects. From statistical test, it is concluded that all respondent groups were strongly in the favor of management support factor as CSF (Critical Success Factor. The findings of this study were validated on selected case studies. Results of the case studies will help to know the effect of the factors on implementing safety programs during the execution stage.

  3. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  4. Database Support for Workflow Management: The WIDE Project

    NARCIS (Netherlands)

    Grefen, P.W.P.J.; Pernici, B; Sánchez, G.; Unknown, [Unknown

    1999-01-01

    Database Support for Workflow Management: The WIDE Project presents the results of the ESPRIT WIDE project on advanced database support for workflow management. The book discusses the state of the art in combining database management and workflow management technology, especially in the areas of

  5. Decision support system for containment and release management

    Energy Technology Data Exchange (ETDEWEB)

    Oosterhuis, B [Twente Univ., Enschede (Netherlands). Computer Science Dept.

    1995-09-01

    The Containment and Release Management project was carried out within the Reinforced Concerted Action Programme for Accident Management Support and partly financed by the European Union. In this report a prototype of an accident management support system is presented. The support system integrates several concepts from accident management research, like safety objective trees, severe accident phenomena, calculation models and an emergency response data system. These concepts are provided by the prototype in such a way that the decision making process of accident management is supported. The prototype application is demonstrated by process data taken from a severe accident scenario for a pressurized water reactor (PWR) that was simulated with the thermohydraulic computer program MAAP. The prototype was derived from a decision support framework based on a decision theory. For established and innovative concepts from accident management research it is pointed out in which way these concepts can support accident management and how these concepts can be integrated. This approach is generic in two ways; it applies to both pressurized and boiling water reactors and it applies to both in vessel management and containment and release management. The prototype application was developed in Multimedia Toolbox 3.0 and requires at least a 386 PC with 4 MB memory, 6 MB free disk space and MS Windows 3.1. (orig.).

  6. Decision support system for containment and release management

    International Nuclear Information System (INIS)

    Oosterhuis, B.

    1995-09-01

    The Containment and Release Management project was carried out within the Reinforced Concerted Action Programme for Accident Management Support and partly financed by the European Union. In this report a prototype of an accident management support system is presented. The support system integrates several concepts from accident management research, like safety objective trees, severe accident phenomena, calculation models and an emergency response data system. These concepts are provided by the prototype in such a way that the decision making process of accident management is supported. The prototype application is demonstrated by process data taken from a severe accident scenario for a pressurized water reactor (PWR) that was simulated with the thermohydraulic computer program MAAP. The prototype was derived from a decision support framework based on a decision theory. For established and innovative concepts from accident management research it is pointed out in which way these concepts can support accident management and how these concepts can be integrated. This approach is generic in two ways; it applies to both pressurized and boiling water reactors and it applies to both in vessel management and containment and release management. The prototype application was developed in Multimedia Toolbox 3.0 and requires at least a 386 PC with 4 MB memory, 6 MB free disk space and MS Windows 3.1. (orig.)

  7. Causal Factors of Corruption in Construction Project Management: An Overview.

    Science.gov (United States)

    Owusu, Emmanuel Kingsford; Chan, Albert P C; Shan, Ming

    2017-11-11

    The development of efficient and strategic anti-corruption measures can be better achieved if a deeper understanding and identification of the causes of corruption are established. Over the past years, many studies have been devoted to the research of corruption in construction management (CM). This has resulted in a significant increase in the body of knowledge on the subject matter, including the causative factors triggering these corrupt practices. However, an apropos systematic assessment of both past and current studies on the subject matter which is needful for the future endeavor is lacking. Moreover, there is an absence of unified view of the causative factors of corruption identified in construction project management (CPM). This paper, therefore, presents a comprehensive review of the causes of corruption from selected articles in recognized construction management journals to address the mentioned gaps. A total number of 44 causes of corruption were identified from 37 publications and analyzed in terms of existing causal factors of corruption, annual trend of publications and the thematic categorization of the identified variables. The most identifiable causes were over close relationships, poor professional ethical standards, negative industrial and working conditions, negative role models and inadequate sanctions. A conceptual framework of causes of corruption was established, after categorizing the 44 variables into five unique categories. In descending order, the five constructs are Psychosocial-Specific Causes, Organizational-Specific Causes, Regulatory-Specific Causes, Project-Specific Causes and Statutory-Specific Causes. This study extends the current literature of corruption research in construction management and contributes to a deepened understanding of the causal instigators of corruption identified in CPM. The findings from this study provide valuable information and extended knowledge to industry practitioners and policymakers as well as

  8. Exploration and practice of data management in information construction of Tianwan nuclear power station

    International Nuclear Information System (INIS)

    Jiang Lirui; Wang Yinhui; Liu Feng; Zhu Yunfei; Song Jili

    2014-01-01

    The paper introduces the exploration and practices in TNPS data management system construction, data management system maturity model construction, management system maturity self-evaluation and data quality improvement, etc. Through the identification and illustration on TNPS data management functions and it also illustrates the effect of scientific management on the enterprise operation with the combination of the characteristics of Big Data Time. Then it looks into the prospect of the data management. (authors)

  9. Construction schedule management of China Experimental Fast Reactor

    International Nuclear Information System (INIS)

    Wang Yue

    2012-01-01

    China Experimental Fast Reactor (CEFR) in the first Fast Reactor in China, which is one of large project of the National High Technology Research and Development Program ('863' Program). On 21 st July 2011, CEFR had succeeded to connect to power grid, the target of construction had come true. To a large item, schedule management is one of the most important management, this paper a overall discussion about CEFR item. It has proved that the management of CEFR project is scientific, normative and high-efficiency, it will be valuable for lager Fast Reactor item and designers in interrelated field. (author)

  10. Using management inquiry to co-construct other memories about the future

    DEFF Research Database (Denmark)

    Larsen, Mette Vinther; Willert, Søren

    2017-01-01

    on the acknowledgment that people in organizations have memories of the future. And it is argued that the prospective memories managers have of how an organizational dilemma will unfold in the nearby future shape their actions and co-construction of meaning in the present. In the article, we exemplify and explore how......The focal point in this article is to explore how management inquiry in the context of reflexive dialogical action research can be used as a way for researchers and managers to jointly construct knowledge that partakes in developing organizational life from “within.” This article builds...... researchers and managers by using “unadjusted responses” and “social poetics” as ways of gesturing and responding can engage in management inquiry and enhance the future managers remember to make room for more desirable future memories to emerge that expand managers’ possible space for action in the present....

  11. Analysis of factors influencing safety management for metro construction in China.

    Science.gov (United States)

    Yu, Q Z; Ding, L Y; Zhou, C; Luo, H B

    2014-07-01

    With the rapid development of urbanization in China, the number and size of metro construction projects are increasing quickly. At the same time, and increasing number of accidents in metro construction make it a disturbing focus of social attention. In order to improve safety management in metro construction, an investigation of the participants' perspectives on safety factors in China metro construction has been conducted to identify the key safety factors, and their ranking consistency among the main participants, including clients, consultants, designers, contractors and supervisors. The result of factor analysis indicates that there are five key factors which influence the safety of metro construction including safety attitude, construction site safety, government supervision, market restrictions and task unpredictability. In addition, ANOVA and Spearman rank correlation coefficients were performed to test the consistency of the means rating and the ranking of safety factors. The results indicated that the main participants have significant disagreement about the importance of safety factors on more than half of the items. Suggestions and recommendations on practical countermeasures to improve metro construction safety management in China are proposed. Copyright © 2013 Elsevier Ltd. All rights reserved.

  12. A Bibliometric Review on Risk Management and Building Information Modeling for International Construction

    OpenAIRE

    Ganbat, Tsenguun; Chong, Heap-Yih; Liao, Pin-Chao; Wu, You-Di

    2018-01-01

    International construction is complicated and involves high risks. However, with the development of technological innovation, Building Information Modeling (BIM) emerged and seems to be able to address certain risks. To understand BIM applications in risk management for international construction, a state-of-the-art review is required. Therefore, this paper aims to identify the research trends and opportunities for risk management in BIM-enabled international construction by reviewing 526 pee...

  13. The use of production management techniques in the construction of large scale physics detectors

    International Nuclear Information System (INIS)

    Bazan, A.; Chevenier, G.; Estrella, F.

    1999-01-01

    The construction process of detectors for the Large Hadron Collider (LHC) experiments is large scale, heavily constrained by resource availability and evolves with time. As a consequence, changes in detector component design need to be tracked and quickly reflected in the construction process. With similar problems in industry engineers employ so-called Product Data Management (PDM) systems to control access to documented versions of designs and managers employ so-called Product Data Management (PDM) systems to control access to documented versions of designs and managers employ so-called Workflow Management Software (WfMS) to coordinate production work processes. However, PDM and WfMS software are not generally integrated in industry. The scale of LHC experiments, like CMS, demands that industrial production techniques be applied in detector construction. This paper outlines the major functions and applications of the CRISTAL system (Cooperating Repositories and an Information System for Tracking Assembly Lifecycles) in use in CMS which successfully integrates PDM and WfMS techniques in managing large scale physics detector construction. This is the first time industrial production techniques have been deployed to this extent in detector construction

  14. Assessment of different construction and demolition waste management approaches

    Directory of Open Access Journals (Sweden)

    Manal S. Abdelhamid

    2014-12-01

    Full Text Available The waste generated from construction and demolition sites is considered one of the most irritating problems in Egypt. In the last 10 years some effort has been made toward solving this problem, the most outstanding is the newly issued Egyptian rating system “Green Pyramids Rating System”. It emphasizes on waste management and particularly “site provision and environment” which contributes to 75% of the management category score. However the traditional practice which is limited to dumping all the generated waste is still dominating. The absence of sustainable practices in construction sector in Egypt led to the lack in financial and environmental data. From strategic perspective, the research aims at developing a detailed procedure to evaluate two construction and demolition waste management approaches by means of Decision Matrix technique. A detailed study is introduced for the two approaches; for each approach a flow chart is developed to demonstrate its lifecycle, as well as the cost break down structure and the different stakeholders’ roles. A penetration discussion of the pros and cons for each approach was developed accordingly and came out with sixteen influencing attributes for both approaches. The previous steps paved the ground to construct a Decision Matrix to decide on one of the approaches from a strategic environmentally oriented perspective. The study relied on the detailed and deep demonstration of the two approaches to justify the assigned weight for attributes and scores for corresponding approach. From a strategic perspective, the decision came out in favor of the more environmentally friendly approach.

  15. ACCELERATING CONSTRUCTION INDUSTRY DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Mohan M. Kumaraswamy

    2006-06-01

    Full Text Available The needs for construction industry development are initially viewed from the broader perspectives of imperatives for infrastructure development and national development. All these are clearly more critical in developing countries. A non-exhaustive set of potential drivers and common barriers to construction industry development is identified from previous research. These suggest the usefulness of consolidating a cluster of recent proposals and exercises aiming at (a construction organization development in terms of an over-arching management support system model, as well as improved information and knowledge management; and (b project team development in the context of relationally integrated teams and supply chains, joint risk management and ‘technology and knowledge exchange’ in joint ventures, as well as longer term public private partnerships. These apparently disparate research thrusts are threaded together into a pattern that may inspire, if not feed, specific research and development (R & D agendas for construction industry development in different countries according to their own priorities, constraints and stages of infrastructure and national development.

  16. The research on the material management system in nuclear power plant construction process

    International Nuclear Information System (INIS)

    Liu Xuegeng; Huang Zhongping

    2010-01-01

    According to the module construction speciality of nuclear power plant, this article analyzes the relationship between the actual amount of the material transported to the construction site and the planed needs of the material, and points out the zero inventory management target in the nuclear power plant construction site. Based on this, the article put forward a nuclear power plant material management system which is based on the 'pull' information driver. This system is composed by material coding sub-system, procurement and site material integrated management sub-system and project control sub-system, and is driven by the material demand from construction site to realize the JIT purchasing. This structure of the system can reduce the gap between the actual amount of the material transported to the site and the planed needs of the material and achieve the target of reducing storage at construction site. (authors)

  17. System dynamic modeling on construction waste management in Shenzhen, China.

    Science.gov (United States)

    Tam, Vivian W Y; Li, Jingru; Cai, Hong

    2014-05-01

    This article examines the complexity of construction waste management in Shenzhen, Mainland China. In-depth analysis of waste generation, transportation, recycling, landfill and illegal dumping of various inherent management phases is explored. A system dynamics modeling using Stella model is developed. Effects of landfill charges and also penalties from illegal dumping are also simulated. The results show that the implementation of comprehensive policy on both landfill charges and illegal dumping can effectively control the illegal dumping behavior, and achieve comprehensive construction waste minimization. This article provides important recommendations for effective policy implementation and explores new perspectives for Shenzhen policy makers.

  18. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  19. Safety cost management in construction companies: A proposal classification.

    Science.gov (United States)

    López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C

    2016-06-16

    Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.

  20. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  1. Positioning and Priorities of Growth Management in Construction Industrialization: Chinese Firm-Level Empirical Research

    Directory of Open Access Journals (Sweden)

    Jingxiao Zhang

    2017-06-01

    Full Text Available The purpose of this research is to quantitatively evaluate the growth phase, position, and priorities of the industrialization policy management of the construction industry at firm level. The goal is to integrate quantitative dynamics into the policy-making process for sustainable policy development in future China. This research proposes an integrated framework, including growth management model and industrial policy evaluation method, to identify the challenges of construction industrialization and policy management. The research applies the mixed system method, which includes entropy method and average score method, to analyze the growth stage and major impact indexes targeting 327 survey samples. The empirical results show that the proposed conceptual framework and policy evaluation method could effectively determine the growth position and directions of the construction industrialization. For verification purpose, the study uses the local industry data from Shaanxi Province, China. The calculation results substantiate that the construction industry is in the middle section of the third growth phase. The comparison of the results from statistical methods shows that the local construction industry still needs substantial effort in policy management to improve its sustainable industrialization level. As countermeasures, the policy priorities should concentrate on: (1 enhancing effective cooperation among universities, research institutions and enterprises; (2 improving actions towards technology transfer into productivity; and (3 encouraging market acceptance of construction industrialization. This research complements the existing literature of policy evaluation of construction industrialization. Moreover, it provides theoretical and operational steps on industry policy evaluation and growth management framework, with accurate and ample data analysis on firm-level survey. Researchers and policy makers can use this research for further

  2. Is overprotection a different construct of social support?

    Directory of Open Access Journals (Sweden)

    Victoria Permuy

    2014-07-01

    Full Text Available The aim of this article is to contribute to a better definition of the overprotection construct. More specifically, it aims at establishing whether or not it can be considered just an excess of social support. To do this, two instruments, OPSA and UCLA-SSI, developed from different perspectives on the issue, were translated and adapted from English into Spanish. Analysis performed on a diverse sample of 436 subjects show a good reliability of scores obtained with the Spanish versions, as much on the OPSA test (α = .82 with the full format and α = .81 with the short one as on the two selected subscales of the UCLA-SSI test (α = .88 with Need/ Want Support subscale, and α = .90 with the Support Received subscale. The relationship among the different measurements was analyzed in a typical sample of 50 recent myocardial infarction patients, as usual in this field. Results suggest that overprotection differs both in quality and quantity from given social support, but it is however related to needed social support. This new finding seems to indicate that those individuals who are more in need of social support could indeed be the more overprotected ones. Clinical and educational implications of the results are discussed.

  3. Strategies for effective management of health and safety in confined site construction

    Directory of Open Access Journals (Sweden)

    John Spillane

    2013-12-01

    Full Text Available Purpose: The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. Design/Methodology/Approach: This is achieved by utilising individual interviews, focus groups discussion on selected case studies of confined construction sites, coupled with a questionnaire survey. Findings: The top five key strategies include (1 Employ safe system of work plans to mitigate personnel health and safety issues; (2 Inform personnel, before starting on-site, of the potential issues using site inductions; (3 Effective communication among site personnel; (4 Draft and implement an effective design site layout prior to starting on-site; and (5 Use of banksman (traffic co-ordinator to segregate personnel from vehicular traffic. Practical Implication: The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. Originality/Value: This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

  4. An Analysis of Enterprise Risk Management and IT Effectiveness Constructs

    Science.gov (United States)

    Waithe, Errol

    2016-01-01

    One major problem many organizations are facing is balancing the risk-management practices of the organization with overall information technology (IT) effectiveness. The purpose of this non-experimental quantitative correlational study was to assess the constructs and correlations associated with enterprise risk management and IT effectiveness.…

  5. Development of a descriptive model of an integrated information system to support complex, dynamic, distributed decision making for emergency management in large organisations

    International Nuclear Information System (INIS)

    Andersen, V.; Andersen, H.B.; Axel, E.; Petersen, T.

    1990-01-01

    A short introduction will be given to the European (ESPRIT II) project, ''IT Support for Emergency Management - ISEM''. The project is aimed at the development of an integrated information system capable of supporting the complex, dynamic, distributed decision making in the management of emergencies. The basic models developed to describe and construct emergency management organisations and their preparedness have been illustrated, and it has been stated that similarities may be found even in emergency situations that originally are of quite different nature. (author)

  6. Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts

    Directory of Open Access Journals (Sweden)

    Saad Sarhan

    2013-03-01

    Full Text Available Performance measurement has received substantial attention from researchers and the construction industry over the past two decades. This study sought to assess UK practitioners’ awareness of the importance of the use of appropriate performance measures and its role in supporting the application of Lean Construction (LC concepts. To enable the study to achieve its objectives, a review of a range of measurements developed to evaluate project performance including those devoted to support LC efforts was conducted. Consequently a questionnaire survey was developed and sent to 198 professionals in the UK construction industry as well as a small sample of academics with an interest in LC. Results indicated that although practitioners recognise the importance of the selection of non-financial performance measures, it has not been properly and widely implemented. The study identified the most common techniques used by UK construction organisations for performance measurement, and ranked a number of non-financial key performance indicators as significant. Some professed to have embraced the Last Planner System methodology as a means for performance measurement and organisational learning, while further questioning suggested otherwise. It was also suggested that substance thinking amongst professionals could be a significant hidden barrier that militates against the successful implementation of LC.

  7. ROW (Right-of-Way) interfering construction activities management program

    Energy Technology Data Exchange (ETDEWEB)

    Rosito, Roberta; Oliveira, Marisa; Lima, Shirley [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    A significant portion of pipeline failures occurs due to external damage. This includes third party right of way (ROW) encroachment, which shall be identified and avoided. However, injuries caused by known and planned activities do happen. Construction of crossing or sharing ROW pipelines, crossing roads and bridges, neighboring buildings and excavations of any kind might put existing pipelines in risk. This paper presents how the TRANSPETRO ROW Interfering Construction Activities Management Program is implemented by a regional ROW maintenance department responsible for more than 3,000 km of pipelines, mostly in Rio de Janeiro and Minas Gerais states. This program is based on a TRANSPETRO procedure that was written after the publication of the Official Order number 125 of ANP (Oil, Gas and Biofuel Brazilian National Agency). Tasks from design review and approval to field construction supervision are performed by the staff responsible for the routine patrols and maintenance management. The ability of foreseeing risky activities is improved by expertise gained from day-to-day work on site. (author)

  8. Construction firm practices and manager beliefs regarding the employment and safety of teenaged employees: a North Carolina based study.

    Science.gov (United States)

    Rauscher, Kimberly J; Schulman, Michael; Runyan, Carol W

    2010-01-01

    The objective of this study was to examine the reported practices of construction firms and the beliefs of firm managers/supervisors with respect to employing youth under age 18 and ensuring their safety. The participants in this study were firm representatives from 54, mostly small to medium sized, construction firms in North Carolina. Survey responses were analyzed for the entire sample and within strata of firm size (1-10, 11+ employees) using descriptive statistics. Percentages and 95% confidence intervals were calculated. Chi-square tests were used to test for statistical significance in differences between firm sizes. The findings suggest limits in the adequacy of safety training given to youth in construction, particularly in light of the minimal experience firms require of young hires, that managers' beliefs about the causes of young worker injury are largely focused on worker behaviors rather than on the presence of hazards, and that managers' compliance with child labor laws may be hampered by their lack of knowledge of these laws and an ambivalence toward their usefulness and enforcement. While larger studies are needed to confirm and advance these findings, when considered along with prior studies, they demonstrate the need to improve the safety of the construction environment for youth. The development of new educational interventions by health and safety professionals targeted at construction firms are supported, as are efforts by government regulators to increase enforcement and employer knowledge of the child labor laws.

  9. Stainless steel pool constructing technology and management of Fangjiashan Nuclear Power Company

    International Nuclear Information System (INIS)

    Wei Lianfeng; Wang Qun

    2013-01-01

    The construction of Fangjiashan nuclear power plant stainless steel cladding has been taken much attention. Based on the careful analysis of stainless steel cladding welding and construction main issues; Many measures have been taken such as welding technology, construction process, the stress control of welding deformation, the cleanliness control of construction process, install precision control, improvements of Non-destructive testing, product protection, etc. And installation methods and techniques have been improved and innovative, the installation quality of stainless steel cladding has been enhanced. At the same time, as owners of the plants, we explored the methods of quality supervision and control, together with the relevant units; and sense of quality management has been unified effectively, made stainless steel cladding quality getting better and better. Fangjiashan nuclear power stainless steel cladding construction quality and management experience has been highly recognized by every company. (authors)

  10. The method of using current regulations and standards in designing management and technologies of construction

    Directory of Open Access Journals (Sweden)

    Sinenko Sergey

    2017-01-01

    Full Text Available Economic efficiency of using funds in construction of buildings and structures begins from an effective, proper design, which is based on modern, cutting-edge, advanced equipment, streamlined organization and process solutions of construction operations. In the light of this it is considered application of “Self-Organization and Technology of Building” multifunctional software package capable of solving various engineering tasks on designing management of construction operations in accordance with the applicable rules and regulations in view of using software for automatic generation of workflow. Implementing this software in the construction management processes may help to solve management tasks at the construction site.

  11. Defense Contract Management Command Support to System Acquisition Program Managers

    National Research Council Canada - National Science Library

    1999-01-01

    .... This report discusses the planning of contract administration office support to system acquisition program managers through the program integration process and the customer support outreach program...

  12. Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6

    International Nuclear Information System (INIS)

    Hagan, J.W.

    1994-09-01

    The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide coordination. Primary activities include providing strategic and business planning and reporting support to ESQ management; developing and documenting ESQ management systems and procedures; coordinating ESQ's self-assessment and Award Fee self evaluation efforts; coordinating the ESQ departments's communication, total quality, cost savings, and productivity efforts; and tracking ESQ commitments and staffing data. This program element also provides program direction and performance assessment for the ESH ampersand Q division of ICF KH. The ESH ampersand Q Division educates ICF KH management and employees to protect personnel and the environment; identifies, interprets and inspects to requirements; provides administrative and field support; performs final acceptance of construction; assesses effectiveness of ICF KH programs and processes, and performs baseline ESH ampersand Q assessments

  13. Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6

    Energy Technology Data Exchange (ETDEWEB)

    Hagan, J.W.

    1994-09-01

    The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide coordination. Primary activities include providing strategic and business planning and reporting support to ESQ management; developing and documenting ESQ management systems and procedures; coordinating ESQ`s self-assessment and Award Fee self evaluation efforts; coordinating the ESQ departments`s communication, total quality, cost savings, and productivity efforts; and tracking ESQ commitments and staffing data. This program element also provides program direction and performance assessment for the ESH&Q division of ICF KH. The ESH&Q Division educates ICF KH management and employees to protect personnel and the environment; identifies, interprets and inspects to requirements; provides administrative and field support; performs final acceptance of construction; assesses effectiveness of ICF KH programs and processes, and performs baseline ESH&Q assessments.

  14. Management of metrology in measuring of the displacement of building construction

    Directory of Open Access Journals (Sweden)

    Jiří Kratochvíl

    2007-06-01

    Full Text Available The metrology management of the measurement of the displacement of building construction is not regulated in the standard ČSN ISO 73 0405 - Measurement of the displacement of building construction. But the metrology management has to be included in the project of measurement of the displacement (Stage of project. Then we have to pay an attention to the metrological management during this measurement (Stage of realization and during the evaluation of this measurement (Stage of evaluation. We have to insist on the subsequent improving of metrology management within the frame of the next project (so-called feedback. The metrology management in the measurement of the displacement during the stages should be based on an application of statutory instruments and technical standards. We should insist especially on the system of standards for the quality control ISO 9000. Considering specialities of geodetic measurements it is necessary to adapt the metrology management. That is why it will differ from the metrology management in other fields of knowledge. This paper includes some steps of metrological provision which must not be ignored.

  15. Application of statistical distribution theory to launch-on-time for space construction logistic support

    Science.gov (United States)

    Morgenthaler, George W.

    1989-01-01

    The ability to launch-on-time and to send payloads into space has progressed dramatically since the days of the earliest missile and space programs. Causes for delay during launch, i.e., unplanned 'holds', are attributable to several sources: weather, range activities, vehicle conditions, human performance, etc. Recent developments in space program, particularly the need for highly reliable logistic support of space construction and the subsequent planned operation of space stations, large unmanned space structures, lunar and Mars bases, and the necessity of providing 'guaranteed' commercial launches have placed increased emphasis on understanding and mastering every aspect of launch vehicle operations. The Center of Space Construction has acquired historical launch vehicle data and is applying these data to the analysis of space launch vehicle logistic support of space construction. This analysis will include development of a better understanding of launch-on-time capability and simulation of required support systems for vehicle assembly and launch which are necessary to support national space program construction schedules. In this paper, the author presents actual launch data on unscheduled 'hold' distributions of various launch vehicles. The data have been supplied by industrial associate companies of the Center for Space Construction. The paper seeks to determine suitable probability models which describe these historical data and that can be used for several purposes such as: inputs to broader simulations of launch vehicle logistic space construction support processes and the determination of which launch operations sources cause the majority of the unscheduled 'holds', and hence to suggest changes which might improve launch-on-time. In particular, the paper investigates the ability of a compound distribution probability model to fit actual data, versus alternative models, and recommends the most productive avenues for future statistical work.

  16. SAMEX: A severe accident management support expert

    International Nuclear Information System (INIS)

    Park, Soo-Yong; Ahn, Kwang-Il

    2010-01-01

    A decision support system for use in a severe accident management following an incident at a nuclear power plant is being developed which is aided by a severe accident risk database module and a severe accident management simulation module. The severe accident management support expert (SAMEX) system can provide the various types of diagnostic and predictive assistance based on the real-time plant specific safety parameters. It consists of four major modules as sub-systems: (a) severe accident risk data base module (SARDB), (b) risk-informed severe accident risk data base management module (RI-SARD), (c) severe accident management simulation module (SAMS), and (d) on-line severe accident management guidance module (on-line SAMG). The modules are integrated into a code package that executes within a WINDOWS XP operating environment, using extensive user friendly graphics control. In Korea, the integrated approach of the decision support system is being carried out under the nuclear R and D program planned by the Korean Ministry of Education, Science and Technology (MEST). An objective of the project is to develop the support system which can show a theoretical possibility. If the system is feasible, the project team will recommend the radiation protection technical support center of a national regulatory body to implement a plant specific system, which is applicable to a real accident, for the purpose of immediate and various diagnosis based on the given plant status information and of prediction of an expected accident progression under a severe accident situation.

  17. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    Science.gov (United States)

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  19. Construction of maintenance management system of atomic power plant

    International Nuclear Information System (INIS)

    Shibasaki, Naofumi; Ookawara, Koumei; Suzuki, Masashi

    2005-01-01

    This maintenance management system has the retrieval function of the variation conditions with the three dimensions models and repair history. The structure of system consists of the management data retrieval tool and the total facilities repair plan support tool. The system has the management function of facilities information, a bird's-eye view of three dimensions models, data recording function, output of various kinds of registers, pre-estimation of degradation and the repair plan support function. When the total facilities repair plan support tool is selected, the variation conditions of facilities, repair history and repair cost are shown, and each part of facility and materials is able to display. (S.Y.)

  20. A guideline for interpersonal capabilities enhancement to support sustainable facility management practice

    Science.gov (United States)

    Sarpin, Norliana; Kasim, Narimah; Zainal, Rozlin; Noh, Hamidun Mohd

    2018-04-01

    Facility management is the key phase in the development cycle of an assets and spans over a considerable length of time. Therefore, facility managers are in a commanding position to maximise the potential of sustainability through the development phases from construction, operation, maintenance and upgrade leading to decommission and deconstruction. Sustainability endeavours in facility management practices will contribute to reducing energy consumption, waste and running costs. Furthermore, it can also help in improving organisational productivity, financial return and community standing of the organisation. Facility manager should be empowered with the necessary knowledge and capabilities at the forefront facing sustainability challenge. However, literature studies show a gap between the level of awareness, specific knowledge and the necessary skills required to pursue sustainability in the facility management professional. People capability is considered as the key enabler in managing the sustainability agenda as well as being central to the improvement of competency and innovation in an organisation. This paper aims to develop a guidelines for interpersonal capabilities to support sustainability in facility management practice. Starting with a total of 7 critical interpersonal capabilities factors identified from previous questionnaire survey, the authors conducted an interview with 3 experts in facility management to assess the perceived importance of these factors. The findings reveal a set of guidelines for the enhancement of interpersonal capabilities among facility managers by providing what can be done to acquire these factors and how it can support the application of sustainability in their practice. The findings of this paper are expected to form the basis of a mechanism framework developed to equip facility managers with the right knowledge, to continue education and training and to develop new mind-sets to enhance the implementation of sustainability

  1. The role of knowledge management tools in supporting sustainable forest management

    Directory of Open Access Journals (Sweden)

    H. Vacik

    2013-12-01

    Full Text Available Aim of study: Knowledge Management (KM tools facilitate the implementation of knowledge processes by identifying, creating, structuring, and sharing knowledge through use of information technology in order to improve decision-making. In this contribution, we review the way in which KM tools and techniques are used in forest management, and categorize a selected set of them according to their contribution to support decision makers in the phases of problem identification, problem modelling, and problem solving.Material and Methods: Existing examples of cognitive mapping tools, web portals, workflow systems, best practices, and expert systems as well as intelligent agents are screened for their applicability and use in the context of decision support for sustainable forest management. Evidence from scientific literature and case studies is utilized to evaluate the contribution of the different KM tools to support problem identification, problem modelling, and problem solving.Main results: Intelligent agents, expert systems and cognitive maps support all phases of the forest planning process strongly. Web based tools have good potential to support participatory forest planning. Based on the needs of forest management decision support and the thus-far underutilized capabilities of KM tools it becomes evident that future decision analysis will have to consider the use of KM more intensively. Research highlights: As the problem-solving process is the vehicle for connecting both knowledge and decision making performance, the next generation of DSS will need to better encapsulate practices that enhance and promote knowledge management. Web based tools will substitute desktop applications by utilizing various model libraries on the internet.Keywords: best practices; cognitive mapping; expert systems; intelligent agents; web portals; workflow systems; Decision Support Systems. 

  2. Development of support tools for efficient construction of dynamic simulation program for engineering systems

    International Nuclear Information System (INIS)

    Gofuku, Akio

    1993-01-01

    In this study, two support tools are developed for construction of a dynamic simulation program for engineering systems (especially nuclear systems) by combining software modules. These are (1) a sub-system to support the module selection suitable for dynamic simulation and (2) a graphical user interface to support visual construction of simulation programs. The support tools are designed to be independent on the conception of software modules (data communication methods between modules). In the module selection sub-system of item 1, a module is characterized beforehand by keywords for several criteria. The similarity between the characteristic of requested module by users and that of registered modules in the module library is estimated by a weighted average of similarity indexes for criteria. In the module selection sub-system, the weights are flexibly extracted from users by applying the analytic hierarchy process. The graphical user interface helps users to specify both calling order of modules and data transfer between two modules. The availability of the support tools is evaluated by several sample problems of module selection and dynamic simulation model construction. The support tools will be a strong tool for the efficient usage of software modules. (author)

  3. Traffic incident management in construction and maintenance work zones.

    Science.gov (United States)

    2009-01-01

    In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...

  4. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Science.gov (United States)

    2010-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  5. The role of knowledge management tools in supporting sustainable forest management

    Energy Technology Data Exchange (ETDEWEB)

    Vacik, H.; Torresan, C.; Hujala, T.; Khadka, C.; Reynolds, K.

    2013-07-01

    Aim of study: Knowledge Management (KM) tools facilitate the implementation of knowledge processes by identifying, creating, structuring, and sharing knowledge through use of information technology in order to improve decision-making. In this contribution, we review the way in which KM tools and techniques are used in forest management, and categorize a selected set of them according to their contribution to support decision makers in the phases of problem identification, problem modelling, and problem solving. Material and methods: Existing examples of cognitive mapping tools, web portals, work flow systems, best practices, and expert systems as well as intelligent agents are screened for their applicability and use in the context of decision support for sustainable forest management. Evidence from scientific literature and case studies is utilized to evaluate the contribution of the different KM tools to support problem identification, problem modelling, and problem solving. Main results: Intelligent agents, expert systems and cognitive maps support all phases of the forest planning process strongly. Web based tools have good potential to support participatory forest planning. Based on the needs of forest management decision support and the thus-far under utilized capabilities of KM tools it becomes evident that future decision analysis will have to consider the use of KM more intensively. Research highlights: As the problem-solving process is the vehicle for connecting both knowledge and decision making performance, the next generation of DSS will need to better encapsulate practices that enhance and promote knowledge management. Web based tools will substitute desktop applications by utilizing various model libraries on the internet. (Author)

  6. Life cycle assessment of construction and demolition waste management.

    Science.gov (United States)

    Butera, Stefania; Christensen, Thomas H; Astrup, Thomas F

    2015-10-01

    Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60-95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared with the overall life cycle of building and construction materials, leaching emissions were shown to be potentially significant for toxicity impacts, compared with contributions from production of the same materials, showing that end-of-life impacts and leaching should not be disregarded when assessing environmental impacts from construction products and materials. CO2 uptake in the C

  7. Improved nuclear reactor construction with bottom supported reactor vessel

    International Nuclear Information System (INIS)

    Sharbaugh, J.E.

    1987-01-01

    An improved liquid metal nuclear reactor construction has a reactor core and a generally cylindrical reactor vessel for holding liquid metal coolant and housing the core within the pool. A generally cylindrical concrete containment structure surrounds the reactor vessel and a central support pedestal is anchored to the containment structure base mat and supports the bottom wall of the reactor vessel and the reactor core. The periphery of the reactor vessel bore is supported by an annular structure which allows thermal expansion but not seismic motion of the vessel, and a bed of thermally insulating material uniformly supports the vessel base whilst allowing expansion thereof. A guard ring prevents lateral seismic motion of the upper end of the reactor vessel. The periphery of the core is supported by an annular structure supported by the vessel base and keyed to the vessel wall so as to be able to expand but not undergo seismic motion. A deck is supported on the containment structure above the reactor vessel open top by annular bellows, the deck carrying the reactor control rods such that heating of the reactor vessel results in upward expansion against the control rods. (author)

  8. Investigation of Visual Management Cases in Construction by an Analytical Framework from Manufacturing

    OpenAIRE

    Murata, K.; Nakajima, K.; Kinoshita, K.; Tezel, Algan; Koskela, Lauri; Tzortzopoulos, Patricia; Katayama, H.

    2016-01-01

    Along with the progress of globalization, speed and efficiency have become more critical for any industry than ever before. In this sense, the concept and methods of lean management, promoting these performances, have been deployed from manufacturing, its origin industry, to other industries. This paper deals with this management style in the construction industry, called lean construction. In particular, visual management (VM) as one effective tool in this scheme is focused on. A number of V...

  9. ISEM: Europe's ESPRIT support for emergency management

    International Nuclear Information System (INIS)

    Andersen, V.

    1991-01-01

    The CEC-supported ISEM project to develop Information technology Support for Emergency Management was started in 1989. Two specific applications to demonstrate the ISEM system were selected; a NPP accident and a chemical plant emergency. An Emergency Management System provides user-friendly facilities for communication between the numerous local, regional and national organizations

  10. An Agent Based Approach for Project Management in Construction

    OpenAIRE

    Sencer, Safiye; Turgay, Tahsin

    2013-01-01

    Project management has an important role in terms of time, cost and flexibility. An agentbased architecture provides additional robustness, scalability, flexibility that is particularly appropriate for problems with a dynamic and distributed nature. Integrated agent based project management covers design and construction planning. It is combined with plan execution, tolerating both the design and plan, which may be changed as necessary. In this reason, the decision making process requires tha...

  11. Assessing buyer-supplier relationship management: a multiple case-study in the Dutch construction industry

    NARCIS (Netherlands)

    Bemelmans, Jeroen; Voordijk, Johannes T.; Vos, B.; Buter, J.I.H.

    2012-01-01

    The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction

  12. Assessing buyer-supplier relationship management : A multiple case-study in the Dutch construction industry

    NARCIS (Netherlands)

    Bemelmans, J.; Voordijk, H.; Vos, G.C.J.M.; Buter, J.

    2012-01-01

    The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction

  13. Walking the tightrope: Constructing gender and professional identities in account management

    NARCIS (Netherlands)

    Gremmen, C.C.M.; Benschop, Y.W.M.

    2009-01-01

    This paper contributes to the growing stream of organization research that explores the relationship between professional identities and gender. Our central question pertains to how account managers ‘do gender’ in constructing their professional identities. While account management has been

  14. Management information system of research institute supported by ministry of science and technology

    International Nuclear Information System (INIS)

    1992-12-01

    This book mentions development strategy of MIS. This book contains development strategy of MIS research institute supported by government, computerization of administrative work of research institute, library computer system, methodology on system development, LAN build of ministry science and technology, ocean data base energy data base, computerization of research data management case of construction and analysis for chemical DB, information system of life science, electronic data interchange, queueing theory, biotechnology and computer, comprehensive weather information system, special equipment of data and data processing of oil-hunt operation.

  15. Management information system of research institute supported by ministry of science and technology

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-15

    This book mentions development strategy of MIS. This book contains development strategy of MIS research institute supported by government, computerization of administrative work of research institute, library computer system, methodology on system development, LAN build of ministry science and technology, ocean data base energy data base, computerization of research data management case of construction and analysis for chemical DB, information system of life science, electronic data interchange, queueing theory, biotechnology and computer, comprehensive weather information system, special equipment of data and data processing of oil-hunt operation.

  16. Systems analysis support to the waste management technology center

    International Nuclear Information System (INIS)

    Rivera, A.L.; Osborne-Lee, I.W.; DePaoli, S.M.

    1988-01-01

    This paper describes a systems analysis concept being developed in support of waste management planning and analysis activities for Martin Marietta Energy Systems, Inc. (Energy Systems), sites. This integrated systems model serves as a focus for the accumulation and documentation of technical and economic information from current waste management practices, improved operations projects, remedial actions, and new system development activities. The approach is generic and could be applied to a larger group of sites. This integrated model is a source of technical support to waste management groups in the Energy Systems complex for integrated waste management planning and related technology assessment activities. This problem-solving methodology for low-level waste (LLW) management is being developed through the Waste Management Technology Center (WMTC) for the Low-Level Waste Disposal, Development, and Demonstration (LLWDDD) Program. In support of long-range planning activities, this capability will include the development of management support tools such as specialized systems models, data bases, and information systems. These management support tools will provide continuing support in the identification and definition of technical and economic uncertainties to be addressed by technology demonstration programs. Technical planning activities and current efforts in the development of this system analysis capability for the LLWDDD Program are presented in this paper

  17. Simulation-based modeling of building complexes construction management

    Science.gov (United States)

    Shepelev, Aleksandr; Severova, Galina; Potashova, Irina

    2018-03-01

    The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.

  18. Effectiviteit van markting management support systemen

    NARCIS (Netherlands)

    G.H. van Bruggen (Gerrit); A. Smidts (Ale); B. Wierenga (Berend)

    1994-01-01

    textabstractVerhoogt het gebruik van marketing management support systemen de kwaliteit van marketingbeslissingen? En zo ja, onder welke omstandigheden? Aan de hand van een experimenteel laboratoriumonderzoek met het simulatiespel MARKSTRATonder 80 marketing managers en 160 studenten, kan de eerste

  19. Internal and External Regulation to Support Knowledge Construction and Convergence in Computer Supported Collaborative Learning (CSCL)

    Science.gov (United States)

    Romero, Margarida; Lambropoulos, Niki

    2011-01-01

    Computer Supported Collaborative Learning (CSCL) activities aim to promote collaborative knowledge construction and convergence. During the CSCL activity, the students should regulate their learning activity, at the individual and collective level. This implies an organisation cost related to the coordination of the activity with the team-mates…

  20. MANAGEMENT PROCESS OF HEALTH AND SAFETY RISK IN THE NIGERIA CONSTRUCTION INDUSTRY

    OpenAIRE

    Akwu, Ifeoma Claris

    2017-01-01

    The study examined the state of health and safety risk management practices in the building sector of the construction industry with the objective to examine the health and safety risk management processes adopted by the construction industry in Nigeria; the study adopted the survey and case study research design. It employed the use of Delphi’s technique in the distribution of questionnaire and made use of chi-square analytical technique for the analysis of gathered data. The findings reveal...

  1. IMPLEMENTATION OF THE CONCEPT OF AUTOMATION AND INTELLECTUALIZATION OF MANAGEMENT OF ROAD CONSTRUCTION PROCESSES

    Directory of Open Access Journals (Sweden)

    Ivanchura Vladimir Ivanovich

    2018-02-01

    Full Text Available Subject: management of operating modes of road-building machines, taking into account the implementation of the concept of information modeling of the road. We have reviewed the status and the development problems for directions of improving the control systems of road-construction machine processes. In this work we focus on the road construction stage “laying asphalt-concrete - compaction”, the effective control of which can lead to significant improvement in the quality of road surfaces, increase of durability and reduction of defects in pavements. Research objectives: rationale and directions of realization of the concept of intellectualization of the road construction management. Materials and methods: analysis of the shortcomings of construction of asphalt-concrete pavements, analysis of the methods of workflow management of road-building machines. Results: we have substantiated the methodological background for the development of intellectual control systems of road-building machines. Conclusions: we considered possible ways of introducing the concept of intellectualization of management systems for road-building machines.

  2. Care Management In The Family Health Support Core: Technologies Operated In The Professional Dimension

    Directory of Open Access Journals (Sweden)

    José Maria Ximenes Guimarães

    2017-03-01

    Full Text Available Introduction: The Centre for Health Support Family - NASF has a innovative character with potential to concretize change in the organization of services and in care practices, supporting and expanding the solvability of the actions of the teams of the Family Health Strategy - FHS. To this end, it must operationalize technologies, arrangements and care management devices. Objective: To describe the care management technologies, particularly in the professional dimension, operated by the teams of the Support Centre for Family Health, in its dialogue with the Health Strategy. Methods: case study with a qualitative approach, with the 12 professionals from a NASF team of Maracanaú, Ceará, Brazil. Focal group was performed. The empirical material was analysed based on the content analysis. Results: there is evidence of a proposal for production of integral care based on the use of technologies as host, bond, autonomy and accountability. The user approach is based on the principles of the extended clinic. However, there are difficulties related to the regulation of access, the construction of bonds, the construction of therapeutic projects and intersectional articulation. Final thoughts: it appears necessary to overcome the challenges, strengthen mechanisms for coordination and for negotiation of labour, as well as rethinking the NASF linking logic to a seemingly high number of FHS teams complicates the organization of work processes, building of agendas, weakens the bonds with the users and even the solvency.

  3. PRIORITISING LEAN CONSTRUCTION BARRIERS IN UGANDA'S CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Henry Mwanaki Alinaitwe

    2009-06-01

    Full Text Available Engaging in lean construction efforts could prove to be highly rewarding for building firms in Uganda. However, lean construction is risky and can be disastrous if not properly managed. Lean production efforts in some other countries have not been successful due to the many barriers to its successful implementation. To enable sound lean construction efforts and to increase the chances of success in eliminating waste, a thorough investigation of the barriers is essential. This study presents 31 barriers and investigates their influence (strength on the success of lean construction initiatives. Structured interviews were carried out with technical managers of building firms to assess their perception of the barriers to lean production based on their experience at their firms. The strongest barrier is the provision of inputs exactly when required. Additionally, the barriers were ranked according to the ease of overcoming each. The easiest barrier to overcome is keeping the required items in the right place. Finally, a graphical aid is provided to enable decision makers to concentrate their efforts on the influential (strong, yet easy to overcome barriers. A lack of buildable designs and a participative management style for the workforce are the most important barriers to successful waste reduction in terms of strength and ease of overcoming. On the other hand, a lack of an organisational culture that supports teamwork, a lack of prefabrication and a lack of knowledgeable and skilled workers are regarded as low in strength, and at the same time difficult to overcome.

  4. Assessing Management Regimes in Transboundary River Basins: Do They Support Adaptive Management?

    Directory of Open Access Journals (Sweden)

    G.T. (Tom Raadgever

    2008-06-01

    Full Text Available River basin management is faced with complex problems that are characterized by uncertainty and change. In transboundary river basins, historical, legal, and cultural differences add to the complexity. The literature on adaptive management gives several suggestions for handling this complexity. It recognizes the importance of management regimes as enabling or limiting adaptive management, but there is no comprehensive overview of regime features that support adaptive management. This paper presents such an overview, focused on transboundary river basin management. It inventories the features that have been claimed to be central to effective transboundary river basin management and refines them using adaptive management literature. It then collates these features into a framework describing actor networks, policy processes, information management, and legal and financial aspects. Subsequently, this framework is applied to the Orange and Rhine basins. The paper concludes that the framework provides a consistent and comprehensive perspective on transboundary river basin management regimes, and can be used for assessing their capacity to support adaptive management.

  5. Decisive management in selecting locations for development of construction projects

    Science.gov (United States)

    Szafranko, E.; Pawłowicz, J. A.

    2017-08-01

    The location of an investment project is one of the most important decisions in the construction and land development business. The shape of a new building and aspects of its future use depend on making a good choice of a land plot where it will be constructed. There are many characteristics involved descriptions of land available for development. On the one hand, different buildings (with different envisaged use) fit differently to a given location. Residential homes, for example, require a location which will ensure a peaceful lifestyle, with places for walks and recreation, situated in a relatively quite setting. On the other hand, close proximity to schools, shops or a health clinic is another important consideration. Industrial buildings should be localized so as not to be a nuisance to others, and their location should facilitate efficient transport of raw materials and ready products. Yet other requirements are defined for public buildings. It is therefore evident that the characteristics included in an evaluation of the location of a planned building can be highly diverse and their diversity makes the evaluation difficult. Selection of a location can be supported by a variety of methods. For instance, an evaluation can rely on assigning points which indicate the fulfillment of certain criteria. This approach generates a complex evaluation in the form of tables and maps of usefulness. Another possibility is to make an assessment of the criteria that a given land parcels should satisfy in order to develop a specific type of a building. Having combined these two sets of information, we can create a system or a model for the management of land resources, which will easily help to support decision making processes pertaining to the choice of a location. This article shows a model approach for a specific building.

  6. Management support and perceived consumer satisfaction in skilled nursing facilities.

    Science.gov (United States)

    Metlen, Scott; Eveleth, Daniel; Bailey, Jeffrey J

    2005-08-01

    How managers 'manage' employees influences important firm outcomes. Heskett, Sasser, and Schlesinger contend that the level of internal support for service workers will influence consumer satisfaction. This study empirically explores how skilled nursing facility (SNF) managers affect consumer satisfaction by encouraging employee effectiveness and listening to employees to determine how to improve employee effectiveness. We extend previous research by proposing management as a form of internal support and demonstrating its relationship to service process integration, as a distinct form of internal support. The results of our individual-level investigation of 630 nursing assistants from 45 SNFs provide support for our two-part hypothesis. First, active management support and process integration, as elements of internal support, do lead to increased employee satisfaction and employee effectiveness. Second, the increased employee satisfaction and effectiveness was positively related to consumer satisfaction, as evaluated by the service workers. Thus, there is a positive influence of management's internal support of nursing assistants on perceived consumer satisfaction.

  7. Logistics and logistics support in crisis management and citizen protection

    OpenAIRE

    HOLEJŠOVSKÝ, Jan

    2010-01-01

    ABSTRAKT LOGISTICS AND LOGISTICS SUPPORT IN CRISIS MANAGEMENT AND CITIZEN PROTECTION The graduation thesis on topic "Logistics and logistics support in crisis management and citizen protection" is divided into several chapters, which in summary are a material presenting information about logistics and logistics support in crisis management and citizen protection. This was one of the aims at this work. Chapters I., II., III., IV. describe logistics and logistics support, crisis management, cit...

  8. Portfolio Management Decision Support Tools Analysis Relating to Management Value Metrics

    National Research Council Canada - National Science Library

    Goodson, Christopher J; Knutson, Richard D

    2007-01-01

    .... The results of this research will assist MDA managers, and operational leaders, in making portfolio management decisions for allocating resources to create the correct support tools for MDA processes...

  9. Perceived safety climate, job demands, and coworker support among union and nonunion injured construction workers.

    Science.gov (United States)

    Gillen, Marion; Baltz, Davis; Gassel, Margy; Kirsch, Luz; Vaccaro, Diane

    2002-01-01

    This study evaluated injured construction workers' perceptions of workplace safety climate, psychological job demands, decision latitude, and coworker support, and the relationship of these variables to the injury severity sustained by the workers. Injury severity was assessed using the Health Assessment Questionnaire (HAQ), which evaluates functional limitations. Worker perceptions of workplace variables were determined by two instruments: (a) the Safety Climate Measure for Construction Sites and (b) the Job Content Questionnaire (JCQ). The overall model explained 23% of the variance in injury severity, with unique contributions provided by union status, the Safety Climate Score, and Psychological Job Demands. A positive significant correlation was found between injury severity and the Safety Climate Scores (r = .183, P = .003), and between the Safety Climate Scores and union status (r = .225, P safety climate on 5 of the 10 safety climate items. Union workers were more likely than nonunion workers to: (a) perceive their supervisors as caring about their safety; (b) be made aware of dangerous work practices; (c) have received safety instructions when hired; (d) have regular job safety meetings; and (e) perceive that taking risks was not a part of their job. However, with regard to the 49-item JCQ, which includes Coworker Support, the responses between union and nonunion workers were very similar, indicating an overall high degree of job satisfaction. However, workers who experienced their workplace as more safe also perceived the level of management (r = -.55, P demands, need to be identified.

  10. Rules and regulations as potential moderator on the relationship between organizational internal and external factors with effective construction risk management in Nigerian construction companies: A proposed framework

    Science.gov (United States)

    Adeleke, A. Q.; Bahaudin, A. Y.; Kamaruddeen, A. M.

    2016-08-01

    Certain organizational internal and external factors have been found to influence effective construction risk management within the construction company which has contributed to massive risk occurrence on the projects. Yet, the influence of the organizational factors such as effective communication, team competency with skills, active leadership, political factor, organizational culture, technology factor and economic factor on effective construction risk management among the construction companies operating in Abuja and Lagos state Nigeria have not received considerable attention. More so, a moderating variable is proposed. This paper proposes rules and regulations as the potential moderator on the relationship between organisational internal factors, external factors and effective construction risk management.

  11. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Science.gov (United States)

    2010-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  12. Personal construct psychology: a theory to help understand professional development, a philosophy to support it.

    Science.gov (United States)

    Brocklehurst, Paul R

    2010-10-01

    The aim of this paper is to introduce the reader to personal construct psychology as a theory to help understand the process of change in facilitative and mentoring relationships. Continuing professional development is critical if practitioners are to keep up to date with new ideas, techniques, and materials. However, is it important not only to consider what is learnt, it is also important to understand the how of learning in order to develop an approach that leads to lifelong learning. Mentoring, coaching, and appraisal are all facilitative processes that aim to encourage professionals to engage with their own development. This leads to differing degrees of both behavioural and attitudinal change. As a result, it is useful to have a theory that can help an individual to understand these changes and to identify any difficulties that are associated with them. Personal construct psychology has long been recognised as a potential framework for personal development. It has been used extensively in a broad range of domains, including clinical and educational psychology, management, and psychotherapy. Personal construct psychology is a useful theory for understanding the facilitative process because it enables the facilitator to form a conceptual framework to comprehend behavioural and attitudinal change. Its underlying philosophical approach also supports lifelong learning, given its emphasis on an enquiring mind and reflection, both of which are key to continuing professional development.

  13. Failure stress as a motivator for creative construction management

    NARCIS (Netherlands)

    Gassel, van F.J.M.; Visser, M.J.E.; Bronswijk, van J.E.M.H.; Haidu, M.; Skibniewski, M.

    2013-01-01

    A building assignment is a complex task that demands collaborative working in order to achieve added value for users and society through creative construction management. Modular building systems are used in workshops in the building environment domain to make students aware of various phenomena

  14. Management of Operational Support Requirements for Manned Flight Missions

    Science.gov (United States)

    1991-01-01

    This Instruction establishes responsibilities for managing the system whereby operational support requirements are levied for support of manned flight missions including associated payloads. This management system will ensure that support requirements are properly requested and responses are properly obtained to meet operational objectives.

  15. A Spanish model for quantification and management of construction waste.

    Science.gov (United States)

    Solís-Guzmán, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramírez-de-Arellano, Antonio

    2009-09-01

    Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.

  16. A Spanish model for quantification and management of construction waste

    International Nuclear Information System (INIS)

    Solis-Guzman, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramirez-de-Arellano, Antonio

    2009-01-01

    Currently, construction and demolition waste (C and D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C and D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C and D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C and D waste volume in both new construction and demolition projects.

  17. Technique treatment of early stage support construction system for Gaoling mountain tunnel engineering of Daya Bay nuclear power station

    International Nuclear Information System (INIS)

    Ma Keli

    2010-01-01

    This article studies the technical treatment of primary support system used in Gaoling mountain tunnel construction process at Daya by nuclear power plant in combination with the new austrian tunneling construction method, this article first analyzes the design of primary support system, and the key point of the analyses lies in the primary support technical treatment schemes of Gaoling mountain tunnel with the examples of tunnel collapse and primary support design alteration for bias voltage section, then the construction technology of the primary support system is summarized, and the safety of wall rock is analyzed as well with the measurement data. In the end, suggestions are put forward on the design and construction of primary support system for tunnels on the basis of practical working experience. (author)

  18. An initial investigation on the challenges of managing construction workforce in Saudi Arabia

    Science.gov (United States)

    Al-Emad, N.; Rahman, I. A.

    2017-11-01

    Most of the construction workers in Saudi Arabia are foreigners from several countries having different knowledge, skills and cultures. These create challenges to administer the workers in ensuring project success. This paper presents an initial investigation to uncover the challenges faced by construction professionals in managing construction workforce in Saudi Arabia. It describes insight processes of handling the workforce during planning stage, recruitment procedures and construction stage based on interview with senior manager who are well experienced in handling mega construction projects in Saudi Arabia. The interview was carried out in semi structured mode where the interviewee was given ample time to express the experiences encountered in dealing the workforce issue. This preliminary work able to identify among important issues related to construction workers are restrictions to non-Muslim skilled workers, limited visa quota, being away from family, delay in salary payment, cheating of workers skill’s status, safety issues, communication barriers and living conditions. Hence, these issues require quality leadership attributes such as continuous empathy with workers, respectful, trustful, sincere, reliable, good communication skills and problem solving skills. These findings are useful to construction practitioners and also research work related to construction leadership in handling worker’s issues.

  19. MANAGEMENT OF CONSTRUCTION TIME AT THE RESTORATION OF THE OSTANKINO TV TOWER

    Directory of Open Access Journals (Sweden)

    Михаил Николаевич ЕРШОВ

    2015-05-01

    Full Text Available The article presents options for managing construction time at restoration and renovation of the "Ostankino television tower", Moscow, also provides variants of method for optimization construction and installation works. Methodology is based on the construction of the project models in Microsoft Project and their experimental and statistical analysis using software COMPEX. This method is effective in the optimization reconstruction of complex engineering structures.

  20. Solutions for decision support in university management

    Directory of Open Access Journals (Sweden)

    Andrei STANCIU

    2009-06-01

    Full Text Available The paper proposes an overview of decision support systems in order to define the role of a system to assist decision in university management. The authors present new technologies and the basic concepts of multidimensional data analysis using models of business processes within the universities. Based on information provided by scientific literature and on the authors’ experience, the study aims to define selection criteria in choosing a development environment for designing a support system dedicated to university management. The contributions consist in designing a data warehouse model and models of OLAP analysis to assist decision in university management.

  1. Nuclear reactor construction with bottom supported reactor vessel

    International Nuclear Information System (INIS)

    Sharbaugh, J.E.

    1987-01-01

    This patent describes an improved liquid metal nuclear reactor construction comprising: (a) a nuclear reactor core having a bottom platform support structure; (b) a reactor vessel for holding a large pool of low pressure liquid metal coolant and housing the core; (c) a containment structure surrounding the reactor vessel and having a sidewall spaced outwardly from the reactor vessel side wall and having a base mat spaced below the reactor vessel bottom end wall; (d) a central small diameter post anchored to the containment structure base mat and extending upwardly to the reactor vessel to axially fix the bottom end wall of the reactor vessel and provide a center column support for the lower end of the reactor core; (e) annular support structure disposed in the reactor vessel on the bottom end wall and extending about the lower end of the core; (f) structural support means disposed between the containment structure base mat and bottom end of the reactor vessel wall and cooperating for supporting the reactor vessel at its bottom end wall on the containment structure base mat to allow the reactor vessel to expand radially but substantially prevent any lateral motions that might be imposed by the occurrence of a seismic event; (g) a bed of insulating material disposed between the containment structure base mat and the bottom end wall of the reactor vessel and uniformly supporting the reactor vessel at its bottom end wall; freely expand radially from the central post as it heats up while providing continuous support thereof; (h) a deck supported upon the wall of the containment vessel above the top open end of the reactor vessel; and (i) extendible and retractable coupling means extending between the deck and the top open end of the reactor vessel and flexibly and sealably interconnecting the reactor vessel at its top end to the deck

  2. Feasibility Study on UAV-assisted Construction Surplus Soil Tracking Control and Management Technique

    Science.gov (United States)

    Jieh Haur, Chen; Kuo, Lin Sheng; Fu, Chen Ping; Li Hsu, Yeh; Da Heng, Chen

    2018-01-01

    Construction surplus soil tracking management has been the key management issue in Taiwan since 1991. This is mainly due to the construction surplus soils were often regarded as disposable waste and were disposed openly without any supervision, leading to environmental pollution. Even though the surplus soils were gradually being viewed as reusable resources, some unscrupulous enterprises still dump them freely for their own convenience. In order to dispose these surplus soils, site offices are required to confirm with the soil treatment plant regarding the approximate soil volume for hauling vehicle dispatch. However, the excavated soil volume will transform from bank volume to loose volume upon excavation, which may differ by a certain speculative coefficient (1.3), depending on the excavation site and geological condition. For managing and tracking the construction surplus soils, local government authorities frequently performed on-site spot check, but the lack of rapid assessment tools for soil volume estimation increased the evaluation difficulty for on-site inspectors. This study adopted unmanned aerial vehicle (UAV) in construction surplus soil tracking and rapidly acquired site photography and point cloud data, the excavated soil volume can be determined promptly after post-processing and interpretation, providing references to future surplus soil tracking management.

  3. Practical considerations from construction of the FFTF pipe support system

    International Nuclear Information System (INIS)

    Hartsell, J.O.

    1979-04-01

    Late this year the FFTF is scheduled to initiate criticality and power operation, an event signifying complete resolution of construction problems and compliance with applicable requirements. One of the tasks accomplished to achieve this position was the conduct of cell completion walkthroughs, problem identification, and resolution. Heavily oriented toward the final verification of pipe supports, the cell completion process identified and resolved a series of problems not readily apparent during the detailed design phases of plant construction. It is the objective of this presentation to establish a degree of awareness of these types of problems and of the FFTF techniques employed in resolution. All of the problems depicted herein have been solved and the installations corrected

  4. Environmental management of construction and demolition waste in Kuwait.

    Science.gov (United States)

    Kartam, Nabil; Al-Mutairi, Nayef; Al-Ghusain, Ibrahim; Al-Humoud, Jasem

    2004-01-01

    There is an increasing pressure on the construction industry to reduce costs and improve the quality of our environment. The fact is that both of these goals can be achieved at the same time. Although construction and demolition (C&D) constitutes a major source of waste in terms of volume and weight, its management and recycling efforts have not yet seen the light in Kuwait. This study focuses on recycling efforts leading to the minimization of the total C&D waste that is currently landfilled in Kuwait. This paper presents the current status of C&D waste disposal system in Kuwait and identifies the potential problems to the environment, people and economy. Then, it investigates alternative solutions to manage and control this major type of waste in an economically efficient and environmentally safe manner. Next, the paper describes the feasibility of establishing a C&D waste recycling facility in Kuwait. It concludes by highlighting the major benefits and bottleneck problems with such a recycling facility.

  5. Engaged scholarship in construction management research: the adoption of information and communications technology in construction projects

    NARCIS (Netherlands)

    Voordijk, Johannes T.; Adriaanse, Adriaan Maria

    2016-01-01

    The objective is to explore what engaged scholarship (ES) could mean for construction management research in facilitating interactions between practice and theory. ES aims to develop knowledge that advances both science and practice through engagement of scholars with practice. Three types of ES are

  6. Confined Site Construction: A qualitative investigation of critical issues affecting management of Health and Safety

    OpenAIRE

    Spillane, John P.; Oyedele, Lukumon O.; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E.; Tijani, Iyabo K.

    2011-01-01

    The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, th...

  7. INCREASED COMPETITIVENESS OF CONSTRUCTION ENTERPRISES ON THE BASIS OF ORGANISATIONAL-ECONOMIC DECISIONS OF PERSONNEL POTENTIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    J. R. Emirbekova

    2017-01-01

    Full Text Available Objectives. The development of an algorithm for optimising the formation and use of human resources of a construction enterprise.Methods. The research basis consists in a generalised methodology  for personnel management, as well as specific methods for logical  and statistical analysis of management decision-making in  construction activities. The approaches, criteria, indicators and methods for assessing the effectiveness of human resource  management are studied alongside factors influencing the efficiency  resource potential management in a construction enterprise.Results. A quantitative methodology for the selection of qualified  staff for the implementation of construction projects is proposed.  The indicators of the effectiveness of the staff potential are  determined. Qualitative and quantitative data for the optimal  personnel formation for the construction project realisation are  systematised. An algorithm for optimising the personnel potential of  a construction enterprise is proposed. The use of this algorithm will  inform the choice of organisational and economic solutions for the  formation and effective use of qualified personnel at the expense of  combining professions, thereby reducing the cost and duration of construction work and increasing the resource efficiency and competitiveness of the construction enterprise.Conclusion. The labour potential of a construction enterprise can  significantly contribute to increased efficiency if it is used  appropriately and in an organised manner, using modern scientific  methods of management. Methods for building and organising the  activity of the personnel management system are proposed and a  mechanism for establishing relationships between the employer and employees that promote the most effective use of all types of resources for the development of the enterprise according to  strategic objectives is disclosed. The dominant role of the

  8. Network design and operational modelling for construction green supply chain management

    Directory of Open Access Journals (Sweden)

    Pengfei Zhou Dong Chen

    2013-01-01

    Full Text Available Based on studying organizational structure of Construction Green Supply Chain Management (CGSCM, a mathematical programming model of CGSCM was proposed. The model aimed to maximize the aggregate profits of normalized construction logistics, the reverse logistics and the environmental performance. Numerical experiments show that the proposed approach can improve the aggregate profit effectively. In addition, return ratio, subsidies from governmental organizations, and environmental performance were analyzed for CGSCM performance. Herein, the proper return, subsidy and control strategy could optimize construction green supply chain.

  9. Supporting people with disabilities in managing individual budgets: the role of support brokers.

    Science.gov (United States)

    Quach, Emma D; O'Connor, Darlene Dee; McGaffigan, Erin

    2010-01-01

    Nationwide people with disabilities are self-directing their long-term care supports through individual budgets. Because these individuals may rely on a "support broker" to assist them in making and executing decisions regarding their budgets, the interactions between the participant and the support broker can influence participant autonomy. Massachusetts piloted a program for 14 participants to receive individual budgets for home and community-based services. Central to this pilot were the participant-designated support brokers, including home care case managers and peer advocates. Analysis of data on participants and support brokers indicated that the support brokers struggled with when, how, and how much to assist participants to self-direct. Case managers or other providers assuming the support broker's role will need proper training if they are to respond skillfully to challenging situations self-direction may bring.

  10. Self-management education and support in chronic disease management.

    Science.gov (United States)

    McGowan, Patrick T

    2012-06-01

    With the changing health care environment, prevalence of chronic health conditions, and burgeoning challenges of health literacy, obesity, and homelessness, self-management support provides an opportunity for clinicians to enhance effectiveness and, at the same time, to engage patients to participate in managing their own personal care. This article reviews the differences between patient education and self-management and describes easy-to-use strategies that foster patient self-management and can be used by health care providers in the medical setting. It also highlights the importance of linking patients to nonmedical programs and services in the community. Copyright © 2012 Elsevier Inc. All rights reserved.

  11. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    Science.gov (United States)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  12. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    OpenAIRE

    Gurmu, Argaw Tarekegn; Aibinu, Ajibade Ayodeji; Chan, Toong Khuan

    2016-01-01

    This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry...

  13. The use of production management techniques in the construction of large scale physics detectors

    CERN Document Server

    Bazan, A; Estrella, F; Kovács, Z; Le Flour, T; Le Goff, J M; Lieunard, S; McClatchey, R; Murray, S; Varga, L Z; Vialle, J P; Zsenei, M

    1999-01-01

    The construction process of detectors for the Large Hadron Collider (LHC) experiments is large scale, heavily constrained by resource availability and evolves with time. As a consequence, changes in detector component design need to be tracked and quickly reflected in the construction process. With similar problems in industry engineers employ so-called Product Data Management (PDM) systems to control access to documented versions of designs and managers employ so- called Workflow Management software (WfMS) to coordinate production work processes. However, PDM and WfMS software are not generally integrated in industry. The scale of LHC experiments, like CMS, demands that industrial production techniques be applied in detector construction. This paper outlines the major functions and applications of the CRISTAL system (Cooperating Repositories and an information System for Tracking Assembly Lifecycles) in use in CMS which successfully integrates PDM and WfMS techniques in managing large scale physics detector ...

  14. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry

    OpenAIRE

    Yoon, Seok J.; Lin, Hsing K.; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-01-01

    Background: The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods: The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became ...

  15. Promoting Constructive Activities that Support Vicarious Learning during Computer-Based Instruction

    Science.gov (United States)

    Gholson, Barry; Craig, Scotty D.

    2006-01-01

    This article explores several ways computer-based instruction can be designed to support constructive activities and promote deep-level comprehension during vicarious learning. Vicarious learning, discussed in the first section, refers to knowledge acquisition under conditions in which the learner is not the addressee and does not physically…

  16. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  17. A Duration Prediction Using a Material-Based Progress Management Methodology for Construction Operation Plans

    Directory of Open Access Journals (Sweden)

    Yongho Ko

    2017-04-01

    Full Text Available Precise and accurate prediction models for duration and cost enable contractors to improve their decision making for effective resource management in terms of sustainability in construction. Previous studies have been limited to cost-based estimations, but this study focuses on a material-based progress management method. Cost-based estimations typically used in construction, such as the earned value method, rely on comparing the planned budget with the actual cost. However, accurately planning budgets requires analysis of many factors, such as the financial status of the sectors involved. Furthermore, there is a higher possibility of changes in the budget than in the total amount of material used during construction, which is deduced from the quantity take-off from drawings and specifications. Accordingly, this study proposes a material-based progress management methodology, which was developed using different predictive analysis models (regression, neural network, and auto-regressive moving average as well as datasets on material and labor, which can be extracted from daily work reports from contractors. A case study on actual datasets was conducted, and the results show that the proposed methodology can be efficiently used for progress management in construction.

  18. Managing risks during the construction of a power generation facility

    International Nuclear Information System (INIS)

    Loulakis, M.C.

    1992-01-01

    The construction of a power generation facility is a substantial undertaking that involves considerable risks to all parties involved. While contractors are accustomed to dealing with risks, construction owners are typically more naive about not only the risks they are assuming in the construction of a project, but also about the role they play on the project itself. Owners and developers of power facilities must understand at the outset that their role during the construction of a project is as integral to the success of the project as that of the designer and contractor. In addition, owners should also understand that there are virtually no risks on a construction project that cannot be shifted among the contracting parties as part of the business deal. Consequently, an owner may contractually be assuming the risks of (1) unusually severe weather, (2) unexpected subsurface conditions, (3) strikes at the turbine supplier's plant or (4) changes in law - as well as the increases in price and delays to project completion associated with such risks. In light of this, a prudent owner will evaluate more than just whether there is sufficient financing to complete the construction of a contemplated project. Prudent owners will conduct a risk management review of the project structure and the contracting terms, with the primary focus being (1) the identification and analysis of the most significant risks faced, (2) a determination of how such risks can be either mitigated or eliminated, and (3) the assessment of the financial exposure to the owner should the potential risk become a reality. This paper will present the framework that owners and developers of power generation projects can use in undertaking such a risk management review

  19. Managing Multiple Forms of Employment in the Construction Sector

    DEFF Research Database (Denmark)

    Raja, Jawwad; D. Green, Stuart; Leiringer, Roine

    2013-01-01

    different contracting arrangements impinge on attempts to reposition human resource management (HRM) as a strategic function along the business partnering model. Elevating the role of the HR function is found to be difficult to reconcile with the concurrent demands of managing multiple forms of employment......The construction industry is one of the largest and most complex industrial sectors in the UK. The industry's failure to adopt progressive human resource (HR) practices is routinely blamed on the challenges of operating in a fragmented, project-based environment reliant on subcontracting...

  20. Data management for interdisciplinary field experiments: OTTER project support

    Science.gov (United States)

    Angelici, Gary; Popovici, Lidia; Skiles, J. W.

    1993-01-01

    The ability of investigators of an interdisciplinary science project to properly manage the data that are collected during the experiment is critical to the effective conduct of science. When the project becomes large, possibly including several scenes of large-format remotely sensed imagery shared by many investigators requiring several services, the data management effort can involve extensive staff and computerized data inventories. The OTTER (Oregon Transect Ecosystem Research) project was supported by the PLDS (Pilot Land Data System) with several data management services, such as data inventory, certification, and publication. After a brief description of these services, experiences in providing them are compared with earlier data management efforts and some conclusions regarding data management in support of interdisciplinary science are discussed. In addition to providing these services, a major goal of this data management capability was to adopt characteristics of a pro-active attitude, such as flexibility and responsiveness, believed to be crucial for the effective conduct of active, interdisciplinary science. These are also itemized and compared with previous data management support activities. Identifying and improving these services and characteristics can lead to the design and implementation of optimal data management support capabilities, which can result in higher quality science and data products from future interdisciplinary field experiments.

  1. Life cycle assessment of construction and demolition waste management

    International Nuclear Information System (INIS)

    Butera, Stefania; Christensen, Thomas H.; Astrup, Thomas F.

    2015-01-01

    Highlights: • LCA of C&DW utilisation in road vs. C&DW landfilling. • C&DW utilisation in road better than landfilling for most categories. • Transportation is the most important process in non-toxic impact categories. • Leaching of oxyanions is the critical process in toxic impact categories. • Modelling of Cr fate in the subsoil is highly influential to the results. - Abstract: Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60–95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared

  2. Life cycle assessment of construction and demolition waste management

    Energy Technology Data Exchange (ETDEWEB)

    Butera, Stefania, E-mail: stbu@teknologisk.dk; Christensen, Thomas H.; Astrup, Thomas F.

    2015-10-15

    Highlights: • LCA of C&DW utilisation in road vs. C&DW landfilling. • C&DW utilisation in road better than landfilling for most categories. • Transportation is the most important process in non-toxic impact categories. • Leaching of oxyanions is the critical process in toxic impact categories. • Modelling of Cr fate in the subsoil is highly influential to the results. - Abstract: Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60–95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared

  3. Visual management support system

    Science.gov (United States)

    Lee Anderson; Jerry Mosier; Geoffrey Chandler

    1979-01-01

    The Visual Management Support System (VMSS) is an extension of an existing computer program called VIEWIT, which has been extensively used by the U. S. Forest Service. The capabilities of this program lie in the rapid manipulation of large amounts of data, specifically opera-ting as a tool to overlay or merge one set of data with another. VMSS was conceived to...

  4. The Role of Problem Solving in Construction Management Practices

    DEFF Research Database (Denmark)

    Schultz, Casper Siebken

    2012-01-01

    industry. An Industrial PhD carried out at a large Danish contractor examined how failures and defects are produced and handled in the social practices of construction projects. The study addresses quality issues related to project management and examines the role of problem solving practices......Quality issues are a topic of continuous interest in the Danish construction industry. Not only can failures and defects be vital to the success of the single project but also the annual profits of the whole company can be put at risk. Moreover quality issues jeopardize the reputation of the entire......-dispositions regarding quality issues in the decision making and redressing of defects and failures in the processes. The role of problem solving and trouble-shooting is analysed through the well-organized processes of erecting the precast concrete structure and the chaotic processes of constructing the penthouse storey...

  5. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    OpenAIRE

    Spillane, John P; Oyedele, Lukumon O; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E; Tijani, Iyabo K

    2011-01-01

    The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues...

  6. Sustainable construction building performance simulation and asset and maintenance management

    CERN Document Server

    2016-01-01

    This book presents a collection of recent research works that highlight best practice solutions, case studies and practical advice on the implementation of sustainable construction techniques. It includes a set of new developments in the field of building performance simulation, building sustainability assessment, sustainable management, asset and maintenance management and service-life prediction. Accordingly, the book will appeal to a broad readership of professionals, scientists, students, practitioners, lecturers and other interested parties.

  7. Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

    Science.gov (United States)

    Kurrus, R.; Stump, F.

    1995-01-01

    The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

  8. Reduction of construction wastes by improving construction contract management: a multinational evaluation.

    Science.gov (United States)

    Mendis, Daylath; Hewage, Kasun N; Wrzesniewski, Joanna

    2013-10-01

    The Canadian construction industry generates 30% of the total municipal solid waste deposited in landfills. Ample evidence can be found in the published literature about rework and waste generation due to ambiguity and errors in contract documents. Also, the literature quotes that disclaimer clauses in contract documents are included in the contractual agreements to prevent contractor claims, which often cause rework. Our professional practice has also noted that there are several disclaimer clauses in standard contract documents which have the potential to cause rework (and associated waste). This article illustrates a comparative study of standard contractual documents and their potential to create rework (and associated waste) in different regions of the world. The objectives of this study are (1) to analyse standard contractual documents in Canada, the USA and Australia in terms of their potential to generate rework and waste, and (2) to propose changes/amendments to the existing standard contract documents to minimise/avoid rework. In terms of construction waste management, all the reviewed standard contract documents have deficiencies. The parties that produce the contract documents include exculpatory clauses to avoid the other party's claims. This approach tends to result in rework and construction waste. The contractual agreements/contract documents should be free from errors, deficiencies, ambiguity and unfair risk transfers to minimise/avoid potential to generate rework and waste.

  9. Trend of the research on construction and demolition waste management

    International Nuclear Information System (INIS)

    Yuan Hongping; Shen Liyin

    2011-01-01

    Research interests in addressing construction and demolition (C and D) waste management issues have resulted in a large amount of publications during the last decade. This study demonstrates that there is no systematic examination on the research development in literature in the discipline of C and D waste management. This study presents the latest research trend in the discipline through analyzing the publications from 2000 to 2009 in eight major international journals. The analysis is conducted on the number of papers published annually, main authors' contributions, research methods and data analysis methods adopted, and research topics covered. The results exhibit an increasing research interest in C and D waste management in recent years. Researchers from developed economies have contributed significantly to the development of the research in the discipline. Some developing countries such as Malaysia and China have also been making good efforts in promoting C and D waste management research. The findings from this study also indicate that survey and case study are major methods for data collection, and the data are mostly processed through descriptive analysis. It is anticipated that more future studies on C and D waste management will be led by researchers from developing economies, where construction works will remain their major economic activities. On the other hand, more sophisticated modeling and simulating techniques have been used effectively in a number of studies on C and D waste management research, and this is considered a major methodology for future research in the discipline. C and D waste management will continue to be a hot research topic in the future, in particularly, the importance of human factors in C and D waste management has emerged as a new challenging topic.

  10. Trend of the research on construction and demolition waste management.

    Science.gov (United States)

    Yuan, Hongping; Shen, Liyin

    2011-04-01

    Research interests in addressing construction and demolition (C&D) waste management issues have resulted in a large amount of publications during the last decade. This study demonstrates that there is no systematic examination on the research development in literature in the discipline of C&D waste management. This study presents the latest research trend in the discipline through analyzing the publications from 2000 to 2009 in eight major international journals. The analysis is conducted on the number of papers published annually, main authors' contributions, research methods and data analysis methods adopted, and research topics covered. The results exhibit an increasing research interest in C&D waste management in recent years. Researchers from developed economies have contributed significantly to the development of the research in the discipline. Some developing countries such as Malaysia and China have also been making good efforts in promoting C&D waste management research. The findings from this study also indicate that survey and case study are major methods for data collection, and the data are mostly processed through descriptive analysis. It is anticipated that more future studies on C&D waste management will be led by researchers from developing economies, where construction works will remain their major economic activities. On the other hand, more sophisticated modeling and simulating techniques have been used effectively in a number of studies on C&D waste management research, and this is considered a major methodology for future research in the discipline. C&D waste management will continue to be a hot research topic in the future, in particularly, the importance of human factors in C&D waste management has emerged as a new challenging topic. Copyright © 2010 Elsevier Ltd. All rights reserved.

  11. Knowledge-Based Information Management in Decision Support for Ecosystem Management

    Science.gov (United States)

    Keith Reynolds; Micahel Saunders; Richard Olson; Daniel Schmoldt; Michael Foster; Donald Latham; Bruce Miller; John Steffenson; Lawrence Bednar; Patrick Cunningham

    1995-01-01

    The Pacific Northwest Research Station (USDA Forest Service) is developing a knowledge-based information management system to provide decision support for watershed analysis in the Pacific Northwest region of the U.S. The decision support system includes: (1) a GIS interface that allows users to graphically navigate to specific provinces and watersheds and display a...

  12. Construction of a smart medication dispenser with high degree of scalability and remote manageability.

    Science.gov (United States)

    Pak, JuGeon; Park, KeeHyun

    2012-01-01

    We propose a smart medication dispenser having a high degree of scalability and remote manageability. We construct the dispenser to have extensible hardware architecture for achieving scalability, and we install an agent program in it for achieving remote manageability. The dispenser operates as follows: when the real-time clock reaches the predetermined medication time and the user presses the dispense button at that time, the predetermined medication is dispensed from the medication dispensing tray (MDT). In the proposed dispenser, the medication for each patient is stored in an MDT. One smart medication dispenser contains mainly one MDT; however, the dispenser can be extended to include more MDTs in order to support multiple users using one dispenser. For remote management, the proposed dispenser transmits the medication status and the system configurations to the monitoring server. In the case of a specific event such as a shortage of medication, memory overload, software error, or non-adherence, the event is transmitted immediately. All these operations are performed automatically without the intervention of patients, through the agent program installed in the dispenser. Results of implementation and verification show that the proposed dispenser operates normally and performs the management operations from the medication monitoring server suitably.

  13. Construction of a Smart Medication Dispenser with High Degree of Scalability and Remote Manageability

    Directory of Open Access Journals (Sweden)

    JuGeon Pak

    2012-01-01

    Full Text Available We propose a smart medication dispenser having a high degree of scalability and remote manageability. We construct the dispenser to have extensible hardware architecture for achieving scalability, and we install an agent program in it for achieving remote manageability. The dispenser operates as follows: when the real-time clock reaches the predetermined medication time and the user presses the dispense button at that time, the predetermined medication is dispensed from the medication dispensing tray (MDT. In the proposed dispenser, the medication for each patient is stored in an MDT. One smart medication dispenser contains mainly one MDT; however, the dispenser can be extended to include more MDTs in order to support multiple users using one dispenser. For remote management, the proposed dispenser transmits the medication status and the system configurations to the monitoring server. In the case of a specific event such as a shortage of medication, memory overload, software error, or non-adherence, the event is transmitted immediately. All these operations are performed automatically without the intervention of patients, through the agent program installed in the dispenser. Results of implementation and verification show that the proposed dispenser operates normally and performs the management operations from the medication monitoring server suitably.

  14. Effectiviteit van markting management support systemen

    OpenAIRE

    Bruggen, Gerrit; Smidts, Ale; Wierenga, Berend

    1994-01-01

    textabstractVerhoogt het gebruik van marketing management support systemen de kwaliteit van marketingbeslissingen? En zo ja, onder welke omstandigheden? Aan de hand van een experimenteel laboratoriumonderzoek met het simulatiespel MARKSTRATonder 80 marketing managers en 160 studenten, kan de eerste vraag positief worden beantwoord. Omstandigheden als tijdsdruk, ervaring in het nemen van marketingbeslissingen en de analytische capaciteiten van de gebruikers vormen een belangrijk aandachtspunt ...

  15. Integrated Constructed Wetlands (ICW) for livestock wastewater management.

    Science.gov (United States)

    Harrington, Rory; McInnes, Robert

    2009-11-01

    Social, economic and environmental coherence is sought in the management of livestock wastewater. Wetlands facilitate the biogeochemical processes that exploit livestock wastewater and provide opportunities to achieve such coherence and also to deliver on a range of ecosystem services. The Integrated Constructed Wetland (ICW) concept integrates three inextricably linked objectives: water quantity and quality management, landscape-fit to improve aesthetic site values and enhanced biodiversity. The synergies derived from this explicit integration allow one of the key challenges for livestock management to be addressed. An example utilizing twelve ICW systems from a catchment on the south coast of Ireland demonstrates that over an eight year period mean reduction of total and soluble phosphorus (molybdate reactive phosphorus) exceeded 95% and the mean removal of ammonium-N exceeded 98%. This paper reviews evidence regarding the capacity of ICWs to provide a coherent and sustainable alternative to conventional systems.

  16. Watershed Management Optimization Support Tool (WMOST) v3: Theoretical Documentation

    Science.gov (United States)

    The Watershed Management Optimization Support Tool (WMOST) is a decision support tool that facilitates integrated water management at the local or small watershed scale. WMOST models the environmental effects and costs of management decisions in a watershed context, accounting fo...

  17. Technology Trends and Opportunities for Construction Industry and Lifecycle Management

    OpenAIRE

    Janson, Vidar

    2017-01-01

    Master's thesis in for Offshore Technology: Industrial Asset Management The purpose of the report is to highlight methods that can make it easier for the construction industry and industry in general to benefit from new technology. The report is intended as a reference to technological solutions that along with some techniques, can streamline workflow for multiple tasks in planning, design, and operation and maintenance management. The problems focused on is how to: • Simplify the procu...

  18. Evolutionary algorithms and metaheuristics in civil engineering and Construction management

    CERN Document Server

    Greiner, David

    2015-01-01

    This book focuses on civil and structural engineering and construction management applications. The contributions constitute modified, extended and improved versions of research presented at the  minisymposium organized by the editors at the ECCOMAS conference on this topic in Barcelona 2014.

  19. The Emergence of Family-specific Support Constructs: Cross-level Effects of Family-supportive Supervision and Family-Supportive Organization Perceptions on Individual Outcomes.

    Science.gov (United States)

    Hill, Rachel T; Matthews, Russell A; Walsh, Benjamin M

    2016-12-01

    Implicit to the definitions of both family-supportive supervision (FSS) and family-supportive organization perceptions (FSOP) is the argument that these constructs may manifest at a higher (e.g. group or organizational) level. In line with these conceptualizations, grounded in tenants of conservation of resources theory, we argue that FSS and FSOP, as universal resources, are emergent constructs at the organizational level, which have cross-level effects on work-family conflict and turnover intentions. To test our theoretically derived hypotheses, a multilevel model was examined in which FSS and FSOP at the unit level predict individual work-to-family conflict, which in turn predicts turnover intentions. Our hypothesized model was generally supported. Collectively, our results point to FSOP serving as an explanatory mechanism of the effects that mutual perceptions of FSS have on individual experiences of work-to-family conflict and turnover intentions. Lagged (i.e. overtime) cross-level effects of the model were also confirmed in supplementary analyses. Our results extend our theoretical understanding of FSS and FSOP by demonstrating the utility of conceptualizing them as universal resources, opening up a variety of avenues for future research. Copyright © 2015 John Wiley & Sons, Ltd. Copyright © 2015 John Wiley & Sons, Ltd.

  20. A study on the attitudes and behavioural influence of construction waste management in occupied Palestinian territory.

    Science.gov (United States)

    Al-Sari, Majed I; Al-Khatib, Issam A; Avraamides, Marios; Fatta-Kassinos, Despo

    2012-02-01

    As a step towards comprehending what drives the management of construction waste in the occupied Palestinian territory, this paper quantifies construction waste generation and examines how the local contractors' waste management attitudes and behaviour are influenced. Collection of data was based on a survey, carried out in the southern part of the West Bank between April and May 2010. The survey targeted contractors who specialized in the construction of buildings. A logistic regression model was used to investigate the relationship between various attributes and the attitudes and behaviour that the local contractors demonstrate towards waste management. The results showed that during the construction of buildings, 17 to 81 kg of construction waste are generated per square metre of building floor. Although the area of a building is the key factor determining 74.8% of the variation of construction waste generation, the employment of labour-intensive techniques in the study area means that human factors such as the contractor's attitude and behaviour towards waste management, exert a key influence on waste generation. Attitudes towards the 3Rs of waste minimization and behaviour towards waste disposal are generally positive with smaller contractors exhibiting more positive attitudes and more satisfactory behaviour towards waste management. Overall, while contractors' behaviour towards waste sorting and disposal tends to be more satisfactory among contractors who are more conscious about the potential environmental impacts of construction waste, it was generally observed that in the absence of a regulatory framework, the voluntary attitudes and behaviour among the local contractors are mostly driven by direct economic considerations.

  1. Looking back on safety management in construction of advanced thermal nuclear power plant 'Fugen'

    International Nuclear Information System (INIS)

    Emori, Kengo

    1979-01-01

    The safety management of the advanced thermal nuclear power plant ''Fugen'' during the period from the preparation of plant construction in October, 1970, to the full power operation in March, 1979, is looked back and explained. Any large human and material accidents did not occur during the long construction time. The total numbers of persons and hours were 1.397 x 10 6 workers and 11.55 x 10 6 hours, respectively. The number of labor accidents was twenty with no dead person, the number of loss days was 645 days, the number of accident rate was 1.73, the intensity rate was 0.06, and the mean rate of labor accidents per year per 1000 workers was 6.4. The radiation exposure dose was 65.27 man-rem for the managed 1804 workers in total, during the testing and operating periods. These data show that the safety management for ''Fugen'' is very excellent, considering the following special features: 1) there were many works which were carried out for the first time, 2) the construction of the plant was conducted by five contractors taking partial charge, there were many kinds of construction works, the construction and testing periods were long, and the workers had to go to the site from Tsuruga city by car and bus. The organization of preventing disasters, the concrete implementation items for safety management, including the planning of activities, various meetings, patrol, education and training, the honoring system, the prevention of traffic accident and so on, and the results of actual safety management are explained with the reflection. (Nakai, Y.)

  2. The influence of system interactivity and technical support on learning management system utilization

    Directory of Open Access Journals (Sweden)

    Sousan Baleghi-Zadeh

    2017-03-01

    Full Text Available In recent years, there has been a growing increase in using Learning Management System (LMS by universities. However, its utilization by students is limited in Malaysia. The main purpose of the present study is to develop and test a model that predicts LMS utilization by Malaysian higher education students. Based on the Technology Acceptance Model, the study investigated the relationships among six constructs (system interactivity, technical support, perceived ease of use, perceived usefulness, behavioral intention to use and LMS use through structural equation modelling. The participants were 216 undergraduate students from a local university in Malaysia. The result of the study revealed that system interactivity had a significant effect on perceived usefulness, but not on perceived ease of use; technical support had a significant effect on perceived ease of use, but not on perceived usefulness.

  3. Social Support for Diabetes Self-Management via eHealth Interventions.

    Science.gov (United States)

    Vorderstrasse, Allison; Lewinski, Allison; Melkus, Gail D'Eramo; Johnson, Constance

    2016-07-01

    eHealth interventions have been increasingly used to provide social support for self-management of type 2 diabetes. In this review, we discuss social support interventions, types of support provided, sources or providers of support, outcomes of the support interventions (clinical, behavioral, psychosocial), and logistical and clinical considerations for support interventions using eHealth technologies. Many types of eHealth interventions demonstrated improvements in self-management behaviors, psychosocial outcomes, and clinical measures, particularly HbA1c. Important factors to consider in clinical application of eHealth support interventions include participant preferences, usability of eHealth technology, and availability of personnel to orient or assist participants. Overall, eHealth is a promising adjunct to clinical care as it addresses the need for ongoing support in chronic disease management.

  4. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  5. Infrastructure support for the Waste Management Institute. Progress report

    International Nuclear Information System (INIS)

    1995-01-01

    North Carolina A ampersand T State University is in the process of developing an infrastructure for an interdisciplinary Waste Management Institute (WMI). The Interdisciplinary Waste Management Institute (WMI) was approved in June 1994 by the General Administration of the University of North Carolina as an academic support unit with research and public service functions. The mission of the WMI is to enhance awareness and understanding of waste management issues and to provide instructional support including research and outreach. The goals of WMI are as follows: increase the number of minority professionals who will work in waste management fields; develop cooperative and exchange programs involving faculty, students, government, and industry; serve as institutional sponsor of public awareness workshops and lecture series; and support interdisciplinary research programs. Accomplishments for this reporting period are presented for WMI enrollment; waste management and certificate program; waste management instructional projects; undergraduate scholarship/stipend and faculty student development projects; research; and community relations

  6. Usability evaluation of mobile ICT support used at the building construction site

    DEFF Research Database (Denmark)

    Christiansson, Per; Svidt, Kjeld

    2006-01-01

    The paper summarizes findings from field evaluations and controlled laboratory usability evaluations of new mobile Information and Communication Technology, ICT, support used by craftsmen at construction sites as well as a discussion of methodologies for user centred ICT tools design. The finding...

  7. Decision support for utility environmental risk management

    International Nuclear Information System (INIS)

    Balson, W.E.; Wilson, D.S.

    1991-01-01

    This paper reviews a number of decision support methods developed and applied by Decision Focus Incorporated to help utility personnel manage current environmental problems. This work has been performed for the Environmental Risk Analysis Program of EPRI's Environment Division, and also for a number of electric utilities across the country. These are two distinct types of decision support software tools that have been created: economic risk management and environmental risk analysis. These types differ primarily in the identification of who will make a decision. Economic risk management tools are directed primarily at decisions made by electric utilities. Environmental risk analysis tools are directed primarily at decisions made by legislative or regulatory agencies, about which a utility may wish to comment

  8. Ubiquitous mobile knowledge construction in collaborative learning environments.

    Science.gov (United States)

    Baloian, Nelson; Zurita, Gustavo

    2012-01-01

    Knowledge management is a critical activity for any organization. It has been said to be a differentiating factor and an important source of competitiveness if this knowledge is constructed and shared among its members, thus creating a learning organization. Knowledge construction is critical for any collaborative organizational learning environment. Nowadays workers must perform knowledge creation tasks while in motion, not just in static physical locations; therefore it is also required that knowledge construction activities be performed in ubiquitous scenarios, and supported by mobile and pervasive computational systems. These knowledge creation systems should help people in or outside organizations convert their tacit knowledge into explicit knowledge, thus supporting the knowledge construction process. Therefore in our understanding, we consider highly relevant that undergraduate university students learn about the knowledge construction process supported by mobile and ubiquitous computing. This has been a little explored issue in this field. This paper presents the design, implementation, and an evaluation of a system called MCKC for Mobile Collaborative Knowledge Construction, supporting collaborative face-to-face tacit knowledge construction and sharing in ubiquitous scenarios. The MCKC system can be used by undergraduate students to learn how to construct knowledge, allowing them anytime and anywhere to create, make explicit and share their knowledge with their co-learners, using visual metaphors, gestures and sketches to implement the human-computer interface of mobile devices (PDAs).

  9. Complexity, Contract Design and Incentive Design in the Construction Management Industry

    OpenAIRE

    Beg, Zeshawn Afsari

    2015-01-01

    In this paper I examine how one construction management company uses contract design and incentive design to respond to aspects of task complexity and relationship complexity present in its construction projects. In terms of contract design, I find that the company is unable to increase its use of cost-plus pricing when faced with technically complex projects. Instead, the company uses increased pre-execution design modification and price markups when technically complex projects are contract...

  10. A constructivist approach for teaching research methodology in construction management

    NARCIS (Netherlands)

    Hartmann, Andreas; Doree, Andries G.; Martin, Ludwig

    2010-01-01

    Construction Management (CM) is an acknowledged field of expertise and profession that requires students to research real world problems. To prepare the students for this task, many CM programs contain a Research Methodology (RM) course. However, after taking part in these courses, many students

  11. Constructing Proxy Variables to Measure Adult Learners' Time Management Strategies in LMS

    Science.gov (United States)

    Jo, Il-Hyun; Kim, Dongho; Yoon, Meehyun

    2015-01-01

    This study describes the process of constructing proxy variables from recorded log data within a Learning Management System (LMS), which represents adult learners' time management strategies in an online course. Based on previous research, three variables of total login time, login frequency, and regularity of login interval were selected as…

  12. Appropriate and sustainable wastewater management in developing countries by the use of constructed wetlands

    DEFF Research Database (Denmark)

    Brix, Hans; Koottatep, Thammarat; Fryd, Ole

    2010-01-01

    Constructed wetland systems for wastewater management may have great potential in developing countries as robust and decentralized solution. A case study from Koh Phi Phi island in Thailand where a constructed wetland systems was established after the destructions by the tsunami in 2004...... is described. The project includes a wastewater collection system for the main business area of the island, a pumping station, a multistage constructed wetland system, and a system for reuse of treated wastewater. The wastewater is treated to meet the Thai effluent standards for total suspended solids......, the system is only partly a success, mainly because no key-person or key-authority took responsibility for managing the system....

  13. Development of an allergy management support system in primary care

    Directory of Open Access Journals (Sweden)

    Flokstra - de Blok BMJ

    2017-03-01

    Full Text Available Bertine MJ Flokstra - de Blok,1,2 Thys van der Molen,1,2 Wianda A Christoffers,3 Janwillem WH Kocks,1,2 Richard L Oei,4 Joanne NG Oude Elberink,2,4 Emmy M Roerdink,5 Marie Louise Schuttelaar,3 Jantina L van der Velde,1,2 Thecla M Brakel,1,6 Anthony EJ Dubois2,5 1Department of General Practice, 2GRIAC Research Institute, 3Department of Dermatology, 4Department of Allergology, 5Department of Pediatric Pulmonology and Pediatric Allergy, University of Groningen, University Medical Center Groningen, 6Teaching Unit, Department of Social Psychology, University of Groningen, Groningen, The Netherlands Background: Management of allergic patients in the population is becoming more difficult because of increases in both complexity and prevalence. Although general practitioners (GPs are expected to play an important role in the care of allergic patients, they often feel ill-equipped for this task. Therefore, the aim of this study was to develop an allergy management support system (AMSS for primary care. Methods: Through literature review, interviewing and testing in secondary and primary care patients, an allergy history questionnaire was constructed by allergists, dermatologists, GPs and researchers based on primary care and specialists’ allergy guidelines and their clinical knowledge. Patterns of AMSS questionnaire responses and specific immunoglobulin E (sIgE-test outcomes were used to identify diagnostic categories and develop corresponding management recommendations. Validity of the AMSS was investigated by comparing specialist (gold standard and AMSS diagnostic categories. Results: The two-page patient-completed AMSS questionnaire consists of 12 (mainly multiple choice questions on symptoms, triggers, severity and medication. Based on the AMSS questionnaires and sIgE-test outcome of 118 patients, approximately 150 diagnostic categories of allergic rhinitis, asthma, atopic dermatitis, anaphylaxis, food allergy, hymenoptera allergy and other

  14. Adherence to internet-based mobile-supported stress management

    DEFF Research Database (Denmark)

    Zarski, A C; Lehr, D.; Berking, M.

    2016-01-01

    of this study was to investigate the influence of different guidance formats (content-focused guidance, adherence-focused guidance, and administrative guidance) on adherence and to identify predictors of nonadherence in an Internet-based mobile-supported stress management intervention (ie, GET.ON Stress......) for employees. Methods: The data from the groups who received the intervention were pooled from three randomized controlled trials (RCTs) that evaluated the efficacy of the same Internet-based mobile-supported stress management intervention (N=395). The RCTs only differed in terms of the guidance format...... of the predictors significantly predicted nonadherence. Conclusions: Guidance has been shown to be an influential factor in promoting adherence to an Internet-based mobile-supported stress management intervention. Adherence-focused guidance, which included email reminders and feedback on demand, was equivalent...

  15. An exploratory study of global leaders' and Chinese managers' leadership constructs in multinational corporations in China

    OpenAIRE

    Wang, Lake

    2012-01-01

    This research explores the leadership constructs of global leaders and Chinese managers in multi-national corporations (MNCs) in order to understand whether their constructs are misaligned, and if so, in what ways. To address these questions, data was gathered via repertory grid test interviews with 31 global leaders and 59 Chinese managers in six MNCs’ China organizations. Analysis subsequently revealed that global leaders rely upon twelve key constructs to define global leaders...

  16. Logistic management materials-technical support railway enterprises

    OpenAIRE

    Dykan, V.; Borozenetc, T.

    2014-01-01

    The essence of logistics management. Determine the feasibility of applying the principles of logistics management in organizing the logistics of railway transport. Discussed measures to develop suppliers in the implementation of logistics management logistics. Identified the need to develop and implement regulatory and methodical system to improve materials-technical support through the introduction of modern logistics principles. Applied systemic campaign to organize the materials-technical ...

  17. Recruitment and Transition of Construction Lecturers in Further Education: The Perspective of Middle Managers

    Science.gov (United States)

    Page, Damien

    2013-01-01

    This article presents findings from a study of 14 heads of construction in further education colleges in England as they manage the transition of new construction lecturers from a culture of hypermasculinity to one of emotional labour and caring. It focuses firstly on the dilemmas faced by heads of construction at the recruitment stage before…

  18. 76 FR 8782 - Underground Construction Standard; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2011-02-15

    ...] Underground Construction Standard; Extension of the Office of Management and Budget's (OMB) Approval of... Underground Construction (29 CFR 1926.800). DATES: Comments must be submitted (postmarked, sent, or received...). Seven paragraphs in the Underground Construction Standard (``the Standard''), 29 CFR 1926.800, require...

  19. Processes in construction of failure management expert systems from device design information

    Science.gov (United States)

    Malin, Jane T.; Lance, Nick

    1987-01-01

    This paper analyzes the tasks and problem solving methods used by an engineer in constructing a failure management expert system from design information about the device to te diagnosed. An expert test engineer developed a trouble-shooting expert system based on device design information and experience with similar devices, rather than on specific expert knowledge gained from operating the device or troubleshooting its failures. The construction of the expert system was intensively observed and analyzed. This paper characterizes the knowledge, tasks, methods, and design decisions involved in constructing this type of expert system, and makes recommendations concerning tools for aiding and automating construction of such systems.

  20. Life Support Systems: Wastewater Processing and Water Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Advanced Exploration Systems (AES) Life Support Systems project Wastewater Processing and Water Management task: Within an integrated life support system, water...

  1. To the rationalization of the constructive solutions of the bridge supports

    Directory of Open Access Journals (Sweden)

    Petrova Olena

    2017-01-01

    Full Text Available Reduction of material consumption and labor intensity of building structures is a topical task for both theory and practice of building production. Today there are many ways to achieve proper economic effect while reconstruction or erection of building and structures. One of them is to rationalize well-known constructive solutions using as criteria the value of density of potential energy of deformation of structures. In this connection, the new constructive solution for short massive supports with outer reinforcement made of expanded metal sheet and frames (reinforcing rings which are used in construction of road and railway bridges and high-rise buildings is proposed in this paper. The theoretical approach for the definition of its rational parameters is given. Numerical analysis of the highlighted method is also carried out. As a result of study the increase in the bearing capacity in concrete pillars made in rational mesh clips with and without frames was obtained.

  2. Determinants of Management Innovation in the Ghanaian Construction Consulting Sector

    Directory of Open Access Journals (Sweden)

    De-Graft Owusu-Manu

    2015-03-01

    Full Text Available Determinants of management innovation (MI within the Ghanaian construction consulting sector are examined. A sample of 70 consulting firms is surveyed using self-administered questionnaires. Data are analysed using descriptive statistics and factor analysis. Findings indicate that determinants of MI were interwoven among seven principal factors viz: community and market demands; financial and business management practices; human resource policies; creativity and organizational strategies; corporate social responsibility; prevailing conditions; and competitive leverage. The study adds to the discourse on evolution of innovation within the global consulting sector generally, while providing reference for practitioners and academics in the field with respect to MI determinants more specifically. It is envisaged that practitioners who adopt these findings in the construction consultancy sector would enhance their ability to provide innovative services to clients. Study recommendations include that future research should explore how innovation is diffused within consulting enterprises’ value chains. Paper Type: Research article

  3. Research and practice of informatization construction in waste treatment and management

    International Nuclear Information System (INIS)

    Kong Jinsong; Guo Weiqun; Yu Ren; Xiang Xinmin

    2013-01-01

    The goal, content and requirement of the informatization construction in waste treatment and management in nuclear power system are discussed in the paper, as well as some key problems in this process. Taking the engineering practice of informatization construction in a waste treatment center as an example, the composition and architecture of the information system, the consideration and the solution methods of some key problems in system design and development are introduced in the paper. (authors)

  4. A Principal Component Analysis of Project Management Construction Industry Competencies for the Ghanaian

    Directory of Open Access Journals (Sweden)

    Rockson Dobgegah

    2011-03-01

    Full Text Available The study adopts a data reduction technique to examine the presence of any complex structure among a set of project management competency variables. A structured survey questionnaire was administered to 100 project managers to elicit relevant data, and this achieved a relatively high response rate of 54%. After satisfying all the necessary tests of reliability of the survey instrument, sample size adequacy and population matrix, the data was subjected to principal component analysis, resulting in the identification of six new thematic project management competency areas ; and were explained in terms of human resource management and project control; construction innovation and communication; project financial resources management; project risk and quality management; business ethics and; physical resources and procurement management. These knowledge areas now form the basis for lateral project management training requirements in the context of the Ghanaian construction industry. Key contribution of the paper is manifested in the use of the principal component analysis, which has rigorously provided understanding into the complex structure and the relationship between the various knowledge areas. The originality and value of the paper is embedded in the use of contextual-task conceptual knowledge to expound the six uncorrelated empirical utility of the project management competencies.

  5. Strategies for healthcare facilities, construction, and real estate management.

    Science.gov (United States)

    Lee, James G

    2012-05-01

    Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.

  6. The role of the family in supporting the self-management of chronic conditions: A qualitative systematic review.

    Science.gov (United States)

    Whitehead, Lisa; Jacob, Elisabeth; Towell, Amanda; Abu-Qamar, Ma'en; Cole-Heath, Amanda

    2018-01-01

    To explore the contribution of family members in promoting and supporting the self-management of chronic conditions amongst adult family members. The prevalence of chronic disease continues to grow globally. The role of the family in chronic condition management and support for self-management has received little attention. A systematic review of qualitative literature using the Joanna Briggs Institute approach for qualitative systematic reviews. Ovid (MEDLINE, CINAHL and PsycINFO) were searched for the period of database inception-2016. The QARI (Qualitative Assessment and Review Instrument) critical appraisal instrument was used to assess the quality of each study. Using the Joanna Briggs Institute-QARI data extraction tool, findings related to the family role in the self-management of chronic conditions were extracted and each finding rated according to Joanna Briggs Institute-QARI levels of credibility. Findings were categorised and synthesised to produce a final set of aggregated findings. Families were key in constructing an environment that was conducive to family engagement and support. Adaptation within the family included maintaining cohesion between family members, normalisation and contextualisation of the chronic condition. Whilst evidence on the value of the family in promoting positive health outcomes is clear, research on how families can specifically support the self-management of chronic conditions is emerging. Family adaptability has been found to be the most powerful predictor of carer depression. Families may need support to change their home and family organisation to adapt to the challenges they face overtime. Change in roles and subsequent adaptation can be stressful, even for those family members at a distance. Nurses working in hospital and community settings can play an important role in assessing how families are adapting to living with chronic illness and to explore strategies to cope with challenges in the home setting. © 2017 John

  7. Study Of Safety Management By Using Gis In Coimbatore

    Directory of Open Access Journals (Sweden)

    S. Kanchana

    2015-08-01

    Full Text Available The safety management is very important in the process of construction .The traditional methods of construction safety control cannot meet the construction of big project. To ensure the safety of construction and reduce accidents in the process of construction the current situation and problems we face in construction safety management should be studied first. And then the project risk warning mechanism based on the GIS is constructed according to the problems we faced to achieve visual monitoring and warning of construction safety risk management and to provide decision support for construction. This project aims to develop a web-based spatial decision support system model for proactive health and safety management in linear construction projects. 5 Currently health and safety management is usually performed reactively instead of proactive management since hazard identification and risk assessment is mostly performed on paper based documents that are not effectively used at site. An information system relates to a chain of operations lead to planning the observation and collection of data to storage and analysis of data to the use of derived information in decision-making processes. To create a web-based free and open sourced GIS that can work with different data formats by exchanging and presenting data as a real-time map on web.

  8. Project Management Support and Services for the Environmental Restoration and Waste Management. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Los Alamos National Laboratory (LANL) Environmental Restoration Technical Support Office (ERTSO) contracted Project Time ampersand Cost, Inc. (PT ampersand C) on 16 November 1992 to provide support services to the US Department of Energy (DOE). ERTSO had traditionally supported the DOE Albuquerque office in the Environmental Restoration and Waste Management Programs and had also supported the Office of Waste Management (EM-30) at DOE Headquarters in Germantown, Maryland. PT ampersand C was requested to provide project management and support services for the DOE as well as liaison and coordination of responses and efforts between various agencies. The primary objective of this work was to continue LANL's technical support role to EM-30 and assist in the development of the COE Cost and Schedule Estimating (CASE) Guide for EM-30. PT ampersand C's objectives, as specified in Section B of the contract, were well met during the duration of the project through the review and comment of various draft documents, trips to DOE sites providing program management support and participating in the training for the EM-30 Cost and Schedule Estimating Guide, drafting memos and scheduling future projects, attending numerous meetings with LANL, DOE and other subcontractors, and providing written observations and recommendations.he results obtained were determined to be satisfactory by both the LANL ERTSO and DOE EM-30 organizations. The objective to further the support from LANL and their associated subcontractor (PT ampersand C) was met. The contract concluded with no outstanding issues

  9. Implementation of safety management systems in Hong Kong construction industry - A safety practitioner's perspective.

    Science.gov (United States)

    Yiu, Nicole S N; Sze, N N; Chan, Daniel W M

    2018-02-01

    In the 1980s, the safety management system (SMS) was introduced in the construction industry to mitigate against workplaces hazards, reduce the risk of injuries, and minimize property damage. Also, the Factories and Industrial Undertakings (Safety Management) Regulation was introduced on 24 November 1999 in Hong Kong to empower the mandatory implementation of a SMS in certain industries including building construction. Therefore, it is essential to evaluate the effectiveness of the SMS in improving construction safety and identify the factors that influence its implementation in Hong Kong. A review of the current state-of-the-practice helped to establish the critical success factors (CSFs), benefits, and difficulties of implementing the SMS in the construction industry, while structured interviews were used to establish the key factors of the SMS implementation. Results of the state-of-the-practice review and structured interviews indicated that visible senior commitment, in terms of manpower and cost allocation, and competency of safety manager as key drivers for the SMS implementation. More so, reduced accident rates and accident costs, improved organization framework, and increased safety audit ratings were identified as core benefits of implementing the SMS. Meanwhile, factors such as insufficient resources, tight working schedule, and high labor turnover rate were the key challenges to the effective SMS implementation in Hong Kong. The findings of the study were consistent and indicative of the future development of safety management practice and the sustainable safety improvement of Hong Kong construction industry in the long run. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.

  10. Assessment Attributes on Effective Construction Management for Property Developers in Malaysia

    Directory of Open Access Journals (Sweden)

    Ayob Norizam

    2014-06-01

    attributes. Comparison was made with attributes from Project Management Book of Knowledge in order to explore the underlying suitability of the proposed attributes with the study area in terms of climate, economy, etc. Factor Analysis was adopted to investigate the group component relationships. This study focuses on the link between CSFs and the implementation of an effective construction management specifically for property developers in Malaysia.

  11. Career pathways in research: support and management.

    Science.gov (United States)

    Kenkre, J E; Foxcroft, D R

    This article, the third in the series on career pathways, highlights support and management careers open to nurses working in the NHS and research and development, or people working for funding bodies or charitable organisations. These roles involve ensuring that the right infrastructure is in place to support research projects, and the correct decisions are made about which research projects should be supported and commissioned.

  12. National differences in FEI support and innovation management

    DEFF Research Database (Denmark)

    Aagaard, Annabeth

    2012-01-01

    This paper explores how Front End Innovation (FEI) is supported among companies of different nationality within the context of Pharmaceutical R&D. The present study is carried out in order to contribute to the development of a clearer understanding of active facilitation of innovation management...... and front end innovation in theory and practice. I aim to show how different aspects of company size, type and nationality affect the way innovation management and FEI is supported within organizations. This is examined through an in-depth case study of the Danish pharmaceutical company, H. Lundbeck A....../S, and a comparative study including seven European and American Biotech and Pharmaceutical companies. The findings from the study reveal a number of similarities and differences in innovation management and FEI support among the different companies and present propositions of important aspects to consider...

  13. Application of 3D model in the schedule management of nuclear power plant construction

    International Nuclear Information System (INIS)

    Nian Fayang

    2009-01-01

    While 3D technology has been widely used in engineering design, the 3D model of engineering design also includes information that can be used to construction. By the visual interface, the 3D model can be used in different aspects of construction. By linking the 3D model with the construction schedule, the 4D model can be created, through which the visual manage of the construction schedule can be achieved. (authors)

  14. Problems of improving the investing process management in NPP construction

    International Nuclear Information System (INIS)

    Denisov, G.A.

    1986-01-01

    Problems of development of the optimal system for the investing process management in NPP construction are discussed. It includes 3 steps: design construction ( including building structure and equipment production ), and achievement of designed technical and economical indices, during reactor start-up. The method for estimating the interest of each participator of the intensing process and developing the optimal solution, that is capable to approach these interests, is suggested. The conclusion is made that it is necessary to develop and confirm the branch standard, which should include a complex amalgamated network of works to improve the organization of the investing process

  15. Technical support and management systems for nuclear power stations

    International Nuclear Information System (INIS)

    Oya, Tadashi; Abe, Norihiko

    1990-01-01

    Sophisticated automatic monitoring and control capabilities and computerized operation management are needed in nuclear power plants to boost plant safety and availability and to reduce operating costs. The article covers the areas of operation management and maintenance management within the larger category of operational administration. The concept of technical administration support-that is, the use of computerization to support the on-site technician's operations-is introduced. The article also suggests the direction of future development. (author)

  16. The construction of a class of trivariate nonseparable compactly supported orthogonal wavelets

    International Nuclear Information System (INIS)

    Huang Yongdong; Lei Chongmin; Yang Miao

    2009-01-01

    In this paper, under a mild condition, the construction of compactly supported orthogonal wavelets is obtained. Wavelets inherit the symmetry of the corresponding scaling function and satisfy the vanishing moment condition originating in the symbols of the scaling function. An example is also given to demonstrate the general theory.

  17. Management of Research Organization: Informational Support

    Directory of Open Access Journals (Sweden)

    Natalia Bruc

    2011-10-01

    Full Text Available We consider the conceptual approach to the system, providing scientific management of a research institution, and information support of scientific cooperation with similar institutions from other countries. This approach is partly tested at the Institute of Mathematics and Computer Science of Academy of Sciences of Moldova and is proposed for several other academic institutions. We believe that this approach will allow automated information management of cooperation with foreign scientific institutions.

  18. A model for evaluating the social performance of construction waste management

    International Nuclear Information System (INIS)

    Yuan Hongping

    2012-01-01

    Highlights: ► Scant attention is paid to social performance of construction waste management (CWM). ► We develop a model for assessing the social performance of CWM. ► With the model, the social performance of CWM can be quantitatively simulated. - Abstract: It has been determined by existing literature that a lot of research efforts have been made to the economic performance of construction waste management (CWM), but less attention is paid to investigation of the social performance of CWM. This study therefore attempts to develop a model for quantitatively evaluating the social performance of CWM by using a system dynamics (SD) approach. Firstly, major variables affecting the social performance of CWM are identified and a holistic system for assessing the social performance of CWM is formulated in line with feedback relationships underlying these variables. The developed system is then converted into a SD model through the software iThink. An empirical case study is finally conducted to demonstrate application of the model. Results of model validation indicate that the model is robust and reasonable to reflect the situation of the real system under study. Findings of the case study offer helpful insights into effectively promoting the social performance of CWM of the project investigated. Furthermore, the model exhibits great potential to function as an experimental platform for dynamically evaluating effects of management measures on improving the social performance of CWM of construction projects.

  19. Stakeholder views of management and decision support tools to integrate climate change into Great Lakes Lake Whitefish management

    Science.gov (United States)

    Lynch, Abigail J.; Taylor, William W.; McCright, Aaron M.

    2016-01-01

    Decision support tools can aid decision making by systematically incorporating information, accounting for uncertainties, and facilitating evaluation between alternatives. Without user buy-in, however, decision support tools can fail to influence decision-making processes. We surveyed fishery researchers, managers, and fishers affiliated with the Lake Whitefish Coregonus clupeaformis fishery in the 1836 Treaty Waters of Lakes Huron, Michigan, and Superior to assess opinions of current and future management needs to identify barriers to, and opportunities for, developing a decision support tool based on Lake Whitefish recruitment projections with climate change. Approximately 64% of 39 respondents were satisfied with current management, and nearly 85% agreed that science was well integrated into management programs. Though decision support tools can facilitate science integration into management, respondents suggest that they face significant implementation barriers, including lack of political will to change management and perceived uncertainty in decision support outputs. Recommendations from this survey can inform development of decision support tools for fishery management in the Great Lakes and other regions.

  20. Maturity of project management in construction companies with the use of fuzzy numbers

    Science.gov (United States)

    Klaus-Rosińska, Agata; Kuchta, Dorota

    2017-07-01

    The main aim of the article is to describe issue of maturity in project management regarding construction companies. Taking into consideration this problem the literature research was made, existing project management maturity models were analyzed, model of maturity in project management (using fuzzy numbers approach) was described and tested. The results of testing stage are shown in the case study.

  1. COMPARISON OF TRENDS IN RISK MANAGEMENT THEORY AND PRACTICES WITHIN THE CONSTRUCTION INDUSTRY

    OpenAIRE

    Dena Crnković; Mladen Vukomanović

    2016-01-01

    This study considered the problem of understanding and use of risk management methods in construction projects and their representation in the literature and their practical application. Research of trends in risk management was conducted using studies from the EBSCO database that were published in the period from 1999 to 2015. The focus included the development of two terms, namely traditional and holistic approach to risk management as well as to uncertainty and opportunity management. The ...

  2. Delineating Supply Chain Management (SCM Features in Construction Project Delivery: The Nigerian Case

    Directory of Open Access Journals (Sweden)

    Benedict Amade

    2017-04-01

    Full Text Available This study sought to delineate SCM features using the analytical hierarchy process (AHP with a view to incorporating it into the delivery of construction projects in Nigeria. The study adopted an exploratory research design (quantitative and qualitative methods. A purposive and convenient sampling technique was deployed with the aid of semi-structured interview, case study; questionnaire survey in a construction firm in Port-Harcourt, Rivers State, Nigeria. Questionnaires were used to collect primary data after being pre-tested via a pilot study for validity and reliability. The data collected were analysed using the AHP. Findings from the study shows that the following features are key; Instituting trust and long term relationships amongst supply chain partners (ITP, supply chain finance (SCF, supply chain and continuous performance measurement (SCCPM, information technology (IT, quality management (QM, supply base management (SBM, senior management’s commitment (SMC and supply chain orientation (SCO. In delivering construction projects to success using the SCM approach, adequate attention and emphasis should be accorded to the aforementioned important features in the order they appear as they would aid in effecting the much needed success. It is also expected that the features would further be beneficial to construction firms as it would enable the firms to manage, measure and evaluate the gains ensuing from the deployment of SCM techniques.

  3. Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

    Science.gov (United States)

    Spee, Ton; Gillen, Matt; Lentz, Thomas J.; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-01-01

    Objectives This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions. PMID:22953194

  4. Review of qualitative approaches for the construction industry: designing a risk management toolbox.

    Science.gov (United States)

    Zalk, David M; Spee, Ton; Gillen, Matt; Lentz, Thomas J; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-06-01

    This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

  5. Operation environment construction of geological information database for high level radioactive waste geological disposal

    International Nuclear Information System (INIS)

    Wang Peng; Gao Min; Huang Shutao; Wang Shuhong; Zhao Yongan

    2014-01-01

    To fulfill the requirements of data storage and management in HLW geological disposal, a targeted construction method for data operation environment was proposed in this paper. The geological information database operation environment constructed by this method has its unique features. And it also will be the important support for HLW geological disposal project and management. (authors)

  6. Managing knowledge in technical and scientific support organizations

    International Nuclear Information System (INIS)

    Beraha, D.; Goetz, K.; Puhr-Westerheide. P.

    2007-01-01

    Full text: In an introduction, the issues in knowledge management regarding licensing and supervision authorities as well as technical and scientific support organisations (TSO's) will be discussed. Although in general many of these issues are quite similar across organizations in the nuclear field, specific questions arise according to the knowledge management policies in regulation and supervision, as will be demonstrated by discussing the results of a recent workshop on human resource management in regulation and safety. With the need for managing knowledge in regulation and safety, a further field of supporting authorities has been opened to TSO's. As a prerequisite, a good knowledge on knowledge management methods and tools has to be acquired by a TSO, preferably by installing an own knowledge management system, thus gaining the indispensable practical experience. Driven by the ongoing demographic change, some TSO's have started early with the implementation of knowledge management practices in their own organizations. Three examples will be presented in the paper concerning knowledge management in safety and regulation, illustrating the efforts undertaken at GRS, the BMU (German Federal Ministry of Environment, Nature Preservation and Reactor Safety), and the TUV-SUD. At GRS, knowledge management started by specifying the goals of maintaining knowledge, particularly of retiring experts, and transferring this knowledge to the next generation. In addition, the knowledge management methods should become an integral part of every day's work, thus ensuring the sustainability of the effort. Initially, a basis for handling and distributing information and documents was provided by setting up a portal with integrated document management capabilities. In a next step, work was concentrated on the core business process, namely project work. This has been achieved by providing an own portal site for each project where all information pertinent to the project such as

  7. BASIC ACTUAL AND EFFECTIVENESS OF LEADERSHIP STYLES OF CONSTRUCTION PROJECT MANAGERS IN SURABAYA

    Directory of Open Access Journals (Sweden)

    Andi Andi

    2004-01-01

    Full Text Available Leading is one of the most important facets in managing construction projects, and behaving as an effective leader is a vital project manager’s responsibility to ensure that work efforts of other persons are directed toward the accomplishment of organizational objectives. This paper aims to determine basic and actual leadership styles of construction project managers in Surabaya. The effectiveness of the actual leadership style is also examined. To accomplish the objective, the paper first briefly reviews the ways in which leadership is approached. Data were then collected through an empirical survey to 46 project managers, taking Fiedler and Hersey-Blanchard’s models as the point of departure. The results indicate that the basic leadership of project managers in Surabaya falls slightly on task-oriented behavior. Meanwhile selling is the most common style used as actual leadership in practice. The paper discusses the effectiveness of the styles adopted and situational variables affecting.

  8. Self-management-support in dementia care: A mixed methods study among nursing staff.

    Science.gov (United States)

    Verkaik, Renate; van Antwerpen-Hoogenraad, Paulien; de Veer, Anke; Francke, Anneke; Huis In Het Veld, Judith

    2017-11-01

    Background Self-management in patients and family caregivers confronted with dementia is not self-evident. Self-management skills may be limited because of the progressive cognitive decline of the patient and because family caregivers are often also very aged. Self-management support by nursing staff is therefore of paramount importance. Objectives To gain insight into how nursing staff perceive their self-management support tasks, and how they put them into practice. Research questions are: 'What are the opinions and experiences of Dutch nursing staff working in home care or residential elderly care regarding self-management support for people with dementia and their family caregivers?' and 'Do nursing staff feel sufficiently trained and skilled for self-management support?'. Methods A mixed methods approach was used, combining cross-sectional quantitative survey data from 206 Dutch nursing professionals with qualitative interviews among 12 nursing staff working in home care or residential elderly care in The Netherlands. Results Nursing staff working in home care experienced self-management support of people with dementia as a part of their job and as an attractive task. They consider 'helping people with dementia to maintain control over their lives by involving them in decisions in daily care' the essence of self-management support. Nursing staff saw family caregivers as their main partners in providing self-management support to the patient. They were less aware that family caregivers themselves might also need self-management support. Nursing staff often felt insufficiently trained to give adequate self-management support. RN's and CNA's did not differ in their opinions, experiences and training needs. Conclusions Nursing staff in home care do consider self-management support an important and attractive task in dementia care. Their skills for providing self-management support to patients with dementia and family caregivers need improvement. Recommendations

  9. Effect of Pre-Construction on Construction Schedule and Client Loyalty

    OpenAIRE

    Jong Hoon Kim; Hyun-Soo Lee; Moonseo Park; Min Jeong; Inbeom Lee

    2016-01-01

    Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client sat...

  10. Giving patients responsibility or fostering mutual response-ability: family physicians' constructions of effective chronic illness management.

    Science.gov (United States)

    Thille, Patricia H; Russell, Grant M

    2010-10-01

    Current visions of family medicine and models of chronic illness management integrate evidence-based medicine with collaborative, patient-centered care, despite critiques that these constructs conflict with each other. With this potential conflict in mind, we applied a critical discursive psychology methodology to present discursive patterns articulated by 13 family physicians in Ontario, Canada, regarding care of patients living with multiple chronic illnesses. Physicians constructed competing versions of the terms "effective chronic illness management" and "patient involvement." One construction integrated individual responsibility for health with primacy of "evidence," resulting in a conceptualization consistent with paternalistic care. The second constructed effective care as involving active partnership of physician and patient, implying a need to foster the ability of both practitioners and patients to respond to complex challenges as they arose. The former pattern is inconsistent with visions of family medicine and chronic illness management, whereas the latter embodies it.

  11. Strategy generation in accident management support

    International Nuclear Information System (INIS)

    Sirola, M.

    1995-01-01

    An increased interest for research in the field of Accident Management can be noted. Several international programmes have been started in order to be able to understand the basic physical and chemical phenomena in accident conditions. A feasibility study has shown that it would be possible to design and develop a computerized support system for plant staff in accident situations. To achieve this goal the Halden Project has initiated a research programme on Computerized Accident Management Support (CAMS project). The aim is to utilize the capabilities of computerized tools to support the plant staff during the various accident stages. The system will include identification of the accident state, assessment of the future development of the accident and planning of accident mitigation strategies. A prototype is developed to support operators and the Technical Support Centre in decision making during serious accident in nuclear power plants. A rule based system has been built to take care of the strategy generation. This system assists plant personnel in planning control proposals and mitigation strategies from normal operation to severe accident conditions. The ideal of a safety objective tree and knowledge from the emergency procedures have been used. Future prediction requires good state identification of the plant status and some knowledge about the history of some critical variables. The information needs to be validated as well. Accurate calculations in simulators and a large database including all important information form the plant will help the strategy planning. (author). 12 refs, 2 figs

  12. Information technology support for emergency management

    International Nuclear Information System (INIS)

    Uuspaeae, P.

    1990-01-01

    Information systems for distributed decision support for emergency management are considered. Specific applications include nuclear power plant emergencies. Emergencies in other industries such as chemical industry may also be considered. Research in the ISEM project is briefly summarized

  13. DCSC (Defense Construction Supply Center) Total Quality Management Master Plan

    Science.gov (United States)

    1989-07-01

    job while allowing them to establish a better balance between work and personal needs. 29 TQM SHORT-MID-LONG RANGE INITIATIVES MID RANGE (3 YEARS...all performance standards. IMPROVE THE QUALITY OF WORKLIFE - Projects requiring engineering support throughout FY 90 and beyond are: Construction of

  14. Construction management at the SP-100 ground engineering system test site

    International Nuclear Information System (INIS)

    Burchell, G.P.; Wilson, L.R.

    1991-01-01

    Contractors under the U.S. Department of Energy management have implemented a comprehensive approach to the management of design and construction of the complex facility modifications at the SP-100 Ground Engineering System Test Site on the Hanford Reservation. The SP-100 Test Site employs a multi-organizational integrated management approach with clearly defined responsibilities to assure success. This approach allows for thorough planning and analysis before the project kick off, thus minimizing the number and magnitude of problems which arise during the course of the project. When combined with a comprehensive cost and schedule/project management reporting system the problems which do occur are recognized early enough to assure timely intervention and resolution

  15. 77 FR 47883 - The Lead in Construction Standard; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2012-08-10

    ... Lead in Construction Standard; Extension of the Office of Management and Budget's (OMB) Approval of... proposal to extend the Office of Management and Budget's (OMB) approval of the information collection requirements specified in the Lead in Construction Standard (29 CFR 1926.62). DATES: Comments must be submitted...

  16. Student use of a Learning Management System for group projects: A case study investigating interaction, collaboration, and knowledge construction

    Science.gov (United States)

    Lonn, Steven D.

    Web-based Learning Management Systems (LMS) allow instructors and students to share instructional materials, make class announcements, submit and return course assignments, and communicate with each other online. Previous LMS-related research has focused on how these systems deliver and manage instructional content with little concern for how students' constructivist learning can be encouraged and facilitated. This study investigated how students use LMS to interact, collaborate, and construct knowledge within the context of a group project but without mediation by the instructor. The setting for this case study was students' use in one upper-level biology course of the local LMS within the context of a course-related group project, a mock National Institutes of Health grant proposal. Twenty-one groups (82 students) voluntarily elected to use the LMS, representing two-thirds of all students in the course. Students' peer-to-peer messages within the LMS, event logs, online surveys, focus group interviews, and instructor interviews were used in order to answer the study's overarching research question. The results indicate that students successfully used the LMS to interact and, to a significant extent, collaborate, but there was very little evidence of knowledge construction using the LMS technology. It is possible that the ease and availability of face-to-face meetings as well as problems and limitations with the technology were factors that influenced whether students' online basic interaction could be further distinguished as collaboration or knowledge construction. Despite these limitations, students found several tools and functions of the LMS useful for their online peer interaction and completion of their course project. Additionally, LMS designers and implementers are urged to consider previous literature on computer-supported collaborative learning environments in order to better facilitate independent group projects within these systems. Further research is

  17. Data Management Coordinators Monitor STS-78 Mission at the Huntsville Operations Support Center

    Science.gov (United States)

    1996-01-01

    Launched on June 20, 1996, the STS-78 mission's primary payload was the Life and Microgravity Spacelab (LMS), which was managed by the Marshall Space Flight Center (MSFC). During the 17 day space flight, the crew conducted a diverse slate of experiments divided into a mix of life science and microgravity investigations. In a manner very similar to future International Space Station operations, LMS researchers from the United States and their European counterparts shared resources such as crew time and equipment. Five space agencies (NASA/USA, European Space Agency/Europe (ESA), French Space Agency/France, Canadian Space Agency /Canada, and Italian Space Agency/Italy) along with research scientists from 10 countries worked together on the design, development and construction of the LMS. This photo represents Data Management Coordinators monitoring the progress of the mission at the Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at MSFC. Pictured are assistant mission scientist Dr. Dalle Kornfeld, Rick McConnel, and Ann Bathew.

  18. Critical ICT-Inhibiting Factors on IBS Production Management Processes in the Malaysia Construction Industry

    Science.gov (United States)

    Ern, Peniel Ang Soon; Kasim, Narimah; Hamid, Zuhairi Abd; Chen, Goh Kai

    2017-10-01

    Industrialized Building System (IBS) is one of the approaches that had been introduced as an alternative to conventional building method where it becomes the new strategy of enhancing the sustainable construction in current industries while spearheading a huge advancement of benefits with green constructions into the existing industries. The IBS approach is actively promoted through several strategies and incentives as an alternative to conventional building methods. Extensive uptakes of modern Information Communication Technology (ICT) applications are able to support the different IBS processes for effective production. However, it is argued that ICT uptake at the organisational level is still in its infancy. This raises the importance to identify critical inhibitors which are inhibing the effective uptake of ICT in the IBS production management process. Critical inhibitors to ICT uptake were identified through questionnaire survey with the IBS industry stakeholders. The mean index and critical t-values are generated with the use of the quantitative tool, Statistical Package for Social Sciences (SPSS). The top ten priority ranked inhibitors reflect the Cost, People and Process elements to ICT uptake. High costs in acquiring the technologies and resistance to change were some main concerns from the findings.

  19. Construction management of Indian pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Bohra, S.A.; Sharma, P.D.

    2006-01-01

    Pandit Jawaharlal Nehru and Dr. Homi J. Bhabha, the visionary architects of Science and Technology of modern India foresaw the imperative need to establish a firm base for indigenous research and development in the field of nuclear electricity generation. The initial phase has primarily focused on the technology development in a systematic and structured manner, which has resulted in establishment of strong engineering, manufacturing and construction base. The nuclear power program started with the setting up of two units of boiling light water type reactors in 1969 for speedy establishment of nuclear technology, safety culture, and development of operation and maintenance manpower. The main aim at that stage was to demonstrate (to ourselves, and indeed to the rest of the world) that India, inspite of being a developing country, with limited industrial infrastructure and low capacity power grids, could successfully assimilate the high technology involved in the safe and economical operation of nuclear power reactors. The selection of a BWR was in contrast to the pressurized heavy water reactors (PHWR), which was identified as the flagship for the first stage of India's nuclear power program. The long-term program in three stages utilizes large reserves of thorium in the monazite sands of Kerala beaches in the third stage with first stage comprising of series of PHWR type plants with a base of 10,000 MW. India has at present 14 reactors in operation 12 of these being of PHWR type. The performance of operating units of 2720 MW has improved significantly with an overall capacity factor of about 90% in recent times. The construction work on eight reactor units with installed capacity of 3960 MW (two PHWRs of 540 MW each, four PHWRs of 220 MW each and two VVERs of 1000 MW each) is proceeding on a rapid pace with project schedules of less than 5 years from first pour of concrete. This is being achieved through advanced construction technology and management. Present

  20. Technology and Products Supporting E-learning by Knowledge Management - A Review

    Directory of Open Access Journals (Sweden)

    Ying Wang

    2014-06-01

    Full Text Available Abstract—Knowledge management is supported by many strategies such as business intelligence, collaboration, document management and e-learning. With the development of modern information technology and the increases of demand for building and maintaining dynamic capabilities, E-learning has played more and more important role of all the technologies in the supporting knowledge management. A successful e-learning system is supported by many critical success factors and technology has become the key factor among these factors. Consequently, the review of basic technologies and corresponding products that support e-learning will be in favor of further study on e-learning. From perspective of knowledge management, this paper makes a review about the relationship between e-learning and knowledge management and advanced technologies and corresponding products that support the design and operation of e-learning system. At the end of this paper, we analyze the main trends of the development direction of e-learning technology.

  1. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    Science.gov (United States)

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  2. Developing a decision support system to meet nurse managers' information needs for effective resource management.

    Science.gov (United States)

    Ruland, C M

    2001-01-01

    This article describes the development of a decision support system called CLASSICA, which assists nurse managers in financial management, resource allocation, activity planning, and quality control. CLASSICA integrates information about patient flow and activity, staffing, and the cost of nursing care at the nursing-unit level. The system provides assistance in planning activities, balancing the budget, and identifying barriers to unsatisfactory resource management. In addition, CLASSICA contains forecasting and simulation options to analyze the influence of factors that affect nursing costs. This article describes the system's development process steps to tailor it to the needs of nurse managers and their existing work practices. Nurse managers actively participated in defining their tasks and responsibilities; identified barriers and difficulties in managing these tasks; defined information needs, data input, and output and interface requirements; and identified expected benefits. Clear communication of project goals, strong user involvement, and purposeful benefit planning was used to achieve the goals for CLASSICA: (1) to provide essential information and decision support for effective financial management, resource allocation, activity planning, and staffing; (2) to improve nurse managers' competence in financial management and decision making; (3) to improve cost containment; and (4) to provide a helpful and easy to use tool for decision support.

  3. Starting early: integration of self-management support into an acute stroke service.

    Science.gov (United States)

    Mäkelä, Petra; Gawned, Sara; Jones, Fiona

    2014-01-01

    Self-management support following stroke is rare, despite emerging evidence for impact on patient outcomes. The promotion of a common approach to self-management support across a stroke pathway requires collaboration between professionals. To date, the feasibility of self-management support in acute stroke settings has not been evaluated. The Bridges stroke self-management package (SMP) is based on self-efficacy principles. It is delivered by professionals and supported by a patient-held workbook. The aim of this project was to introduce the Bridges stroke SMP to the multidisciplinary staff of a London hyperacute and acute stroke unit. The 'Plan Do Study Act' (PDSA) cycle guided iterative stages of project development, with normalisation process theory helping to embed the intervention into existing ways of working. Questionnaires explored attitudes, beliefs and experiences of the staff who were integrating self-management support into ways of working in the acute stroke setting. Self-management support training was delivered to a total of 46 multidisciplinary stroke staff. Of the staff who attended the follow-up training, 66% had implemented Bridges self-management support with patients since initial training, and 100% felt their practice had changed. Questionnaire findings demonstrated that staff attitudes and beliefs had changed following training, particularly regarding ownership and type of rehabilitation goals set, and prioritisation of self-management support within acute stroke care. Staff initiated an audit of washing and dressing practices pre- and post-training. This was designed to evaluate the number of occasions when techniques were used by staff to facilitate patients' independence and self-management. They found that the number of occasions featuring optimum practice went from 54% at baseline to 63% at three months post-training. This project demonstrated the feasibility of integrating self-management support into an acute stroke setting. Further

  4. Development as an effective management system construction and investment projects

    Directory of Open Access Journals (Sweden)

    Beloborodov Roman S.

    2011-02-01

    Full Text Available The article presents the material of the application of the conception «Development» as the effective methodology of the investment-construction project management within the framework the systems approach. Theoretical principles of the application of this conception are generalized and systematized based on the example of the creation of the low habitable complex.

  5. Construction management and economics: the epistemology of a multidisciplinary design science

    NARCIS (Netherlands)

    Voordijk, Johannes T.

    2009-01-01

    Research in the field of construction management and economics (CME) can be characterized as a multidisciplinary design science. Results from the sciences and humanities are necessary inputs for this field of research that deals with design, production and operation of the built environment. The

  6. A role-play approach for teaching research methodology in construction management

    NARCIS (Netherlands)

    Hartmann, Andreas; Doree, Andries G.; Martin, Ludwig; Dainty, A

    2008-01-01

    Assignments of Construction Management (CM) graduate programmes often require students to carry out research on real-world problems. To prepare students for this task, many CM-programmes contain a research methodology course. However, after taking part in these courses, many students still lack the

  7. 76 FR 70166 - Electrical Standards for Construction and General Industry; Extension of the Office of Management...

    Science.gov (United States)

    2011-11-10

    ...] Electrical Standards for Construction and General Industry; Extension of the Office of Management and Budget... contained in the Electrical Standards for Construction (29 CFR part 1926, Subpart K) and for General... maintenance of electric utilization equipment that prevent death and serious injuries among construction and...

  8. A dynamic Bayesian network based approach to safety decision support in tunnel construction

    International Nuclear Information System (INIS)

    Wu, Xianguo; Liu, Huitao; Zhang, Limao; Skibniewski, Miroslaw J.; Deng, Qianli; Teng, Jiaying

    2015-01-01

    This paper presents a systemic decision approach with step-by-step procedures based on dynamic Bayesian network (DBN), aiming to provide guidelines for dynamic safety analysis of the tunnel-induced road surface damage over time. The proposed DBN-based approach can accurately illustrate the dynamic and updated feature of geological, design and mechanical variables as the construction progress evolves, in order to overcome deficiencies of traditional fault analysis methods. Adopting the predictive, sensitivity and diagnostic analysis techniques in the DBN inference, this approach is able to perform feed-forward, concurrent and back-forward control respectively on a quantitative basis, and provide real-time support before and after an accident. A case study in relating to dynamic safety analysis in the construction of Wuhan Yangtze Metro Tunnel in China is used to verify the feasibility of the proposed approach, as well as its application potential. The relationships between the DBN-based and BN-based approaches are further discussed according to analysis results. The proposed approach can be used as a decision tool to provide support for safety analysis in tunnel construction, and thus increase the likelihood of a successful project in a dynamic project environment. - Highlights: • A dynamic Bayesian network (DBN) based approach for safety decision support is developed. • This approach is able to perform feed-forward, concurrent and back-forward analysis and control. • A case concerning dynamic safety analysis in Wuhan Yangtze Metro Tunnel in China is presented. • DBN-based approach can perform a higher accuracy than traditional static BN-based approach

  9. Development of a validation process for parameters utilized in optimizing construction quality management of pavements.

    Science.gov (United States)

    2006-01-01

    The implementation of an effective performance-based construction quality management requires a tool for determining impacts of construction quality on the life-cycle performance of pavements. This report presents an update on the efforts in the deve...

  10. From strategy to action: how top managers' support increases middle managers' commitment to innovation implementation in health care organizations.

    Science.gov (United States)

    Birken, Sarah A; Lee, Shoou-Yih Daniel; Weiner, Bryan J; Chin, Marshall H; Chiu, Michael; Schaefer, Cynthia T

    2015-01-01

    Evidence suggests that top managers' support influences middle managers' commitment to innovation implementation. What remains unclear is how top managers' support influences middle managers' commitment. Results may be used to improve dismal rates of innovation implementation. We used a mixed-method sequential design. We surveyed (n = 120) and interviewed (n = 16) middle managers implementing an innovation intended to reduce health disparities in 120 U.S. health centers to assess whether top managers' support directly influences middle managers' commitment; by allocating implementation policies and practices; or by moderating the influence of implementation policies and practices on middle managers' commitment. For quantitative analyses, multivariable regression assessed direct and moderated effects; a mediation model assessed mediating effects. We used template analysis to assess qualitative data. We found support for each hypothesized relationship: Results suggest that top managers increase middle managers' commitment by directly conveying to middle managers that innovation implementation is an organizational priority (β = 0.37, p = .09); allocating implementation policies and practices including performance reviews, human resources, training, and funding (bootstrapped estimate for performance reviews = 0.09; 95% confidence interval [0.03, 0.17]); and encouraging middle managers to leverage performance reviews and human resources to achieve innovation implementation. Top managers can demonstrate their support directly by conveying to middle managers that an initiative is an organizational priority, allocating implementation policies and practices such as human resources and funding to facilitate innovation implementation, and convincing middle managers that innovation implementation is possible using available implementation policies and practices. Middle managers may maximize the influence of top managers' support on their commitment by communicating with top

  11. Self-management support at the end of life: Patients', carers' and professionals' perspectives on managing medicines.

    Science.gov (United States)

    Campling, N; Richardson, A; Mulvey, M; Bennett, M; Johnston, B; Latter, S

    2017-11-01

    Pain is a frequently reported symptom by patients approaching the end of life and well-established that patients and carers hold fears relating to opioids, and experience side effects related to their use. The management of medicines is intrinsic to achieving effective pain relief. The concept of self-management support whilst well characterised in the context of chronic illness has not been elaborated with respect to end of life care. To identify patient, carer and professional views on the concept of self-management support at end of life, specifically in relation to analgesia and related medicines (for side-effect management) in order to describe, characterise and explain self-management support in this context. Qualitative design, data collection methods involved focus groups and interviews. Topics included the meaning of self-management support in this context, roles and behaviours adopted to manage pain-related medicines, and factors that influence these. A largely deductive approach was used, involving verification and validation of key frameworks from the literature, but with capacity for new findings to emerge. Participants were drawn from two different localities in England, one North, the other South. Interviews with patients and carers took place in their own homes and focus groups with healthcare professionals were held at local hospices. 38 individuals participated. 15 patients, in the last year of life, and 4 carers under the care of community-based specialist palliative care services and 19 specialist palliative care health professionals (predominantly community palliative care nurses). The concept of self-management support had salience for patients, carers and specialist nurses alongside some unique features, specific to the end of life context. Specifically self-management was identified as an ever-changing process enacted along a continuum of behaviours fluctuating from full to no engagement. Disease progression, frequent changes in symptoms and

  12. How do top managers support strategic information system projects and why do they sometimes withhold this support?

    NARCIS (Netherlands)

    Boonstra, A.

    Top management support is an important determinant of information system project success. This is especially the case in complex and large-scale IS projects. Surprisingly, however, there is only limited reliable knowledge about the types of behavior that underlie top management support. Further,

  13. Critical success factors for implementing risk management systems in developing countries

    Directory of Open Access Journals (Sweden)

    M.Reza Hosseini

    2016-03-01

    Full Text Available A review of published studies on risk management in developing countries reveals that critical success factors for implementing risk management has remained an under-researched area of investigation. This paper is aimed at investigating the perceptions of construction professionals concerning the critical success factors (CSFs for implementation of risk management systems (IRMS. Survey data was collected from 87 construction professionals from the Iranian construction industry as a developing country. The results indicate that four factors are regarded as highly critical: ‘support from managers’, ‘inclusion of risk management in construction education and training courses for construction practitioners’, ‘attempting to deliver projects systematically’, and ‘awareness and knowledge of the process for implementing risk management’. Assessing the associations among CSFs also highlighted the crucial role of enhancing the effectiveness of knowledge management practices in construction organisations. Study also revealed that parties involved in projects do not agree on the level of importance of CSFs for implementing risk management in developing countries. This study contributes to practice and research in several ways. For practice, it increases understanding of how closely knowledge management is associated with the implementation of risk management systems in developing countries. For research, the findings would encourage construction practitioners to support effective knowledge management as a precursor to higher levels of risk management implementation on construction projects.

  14. Rules for selection of computer system to support customer relationships management

    Directory of Open Access Journals (Sweden)

    Dorota Buchnowska

    2012-12-01

    Full Text Available The number of support systems for business management on the Polish market is increasing. Because of that, enterprises are facing a more and more difficult dilemma: which solution to choose? This paper will present stages of the selection process of applications for customer relationships management support, discuss selection criteria and present a decision making tool for the selection of management support system, allowing for multi-faceted and impartial comparison of business applications.

  15. A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste

    International Nuclear Information System (INIS)

    Yuan Hongping; Chini, Abdol R.; Lu Yujie; Shen Liyin

    2012-01-01

    Highlights: ► We proposes a model for projecting C and D waste reduction of construction projects. ► The model can simulate effects of various management strategies on waste reduction. ► The model integrates all essential variables that affect C and D waste reduction. ► By using the model, best strategies could be identified before being implemented. - Abstract: During the past few decades, construction and demolition (C and D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C and D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C and D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C and D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C and D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity – interrelationships and dynamics – of any social, economic and managerial system. The dynamic model integrates major variables that affect C and D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C and D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only

  16. Project management in fossil plant construction: A perspective for the Nineties

    International Nuclear Information System (INIS)

    Bhatia, N.K.

    1991-01-01

    The continuing growth in demand for electric power, and the reluctance of electric utility management to commit to new capacity additions has created a potential for somewhat hectic activity in the fossil power plant construction market. With the changing matrix of power plant types and ownerships, the project manager is called upon to deliver a complex product with exacting contract requirements: lump sum contracts, competitive pricing, short schedules, and performance guarantees. A shortage of experienced professionals in the ranks of the owners, engineers, contractors, and suppliers magnifies the challenge. Plant replication, automation, creative management of vendors and contractors, and participative management of the work force will be key elements of successful projects. Partnering between the clients and the engineers-constructors will be an interesting new relationship model

  17. Systems Science in Support of Total Quality Management,

    Science.gov (United States)

    Quality Management (TQM). This paper bridges the gap between these two subjects to illustrate specific means by which systems science can begin to augment TQM. This construction is based upon the consideration of two topics. First, a brief introduction to systems science is provided. Second, systems science is applied through the concept of the Conant-Ashby

  18. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    Directory of Open Access Journals (Sweden)

    Spillane, John P

    2011-12-01

    Full Text Available The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

  19. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  20. Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM

    Directory of Open Access Journals (Sweden)

    Mingjiang Deng

    2018-02-01

    Full Text Available The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnels is 516 km. The total tunneling mileage is 569 km, which includes 49 slow-inclined shafts and vertical shafts. Among the tunnels constructed in the project, the Ka–Shuang tunnel, which is a single tunnel with a length of 283 km, is currently the longest water-conveyance tunnel in the world. The main tunnel of the Ka–Shuang tunnel is divided into 18 tunnel-boring machine (TBM sections, and 34 drilling-and-blasting sections, with 91 tunnel faces. The construction of the Ka–Shuang tunnel has been regarded as an unprecedented challenge for project construction management, risk control, and safe and efficient construction; it has also presented higher requirements for the design, manufacture, operation, and maintenance of the TBMs and their supporting equipment. Based on the engineering characteristics and adverse geological conditions, it is necessary to analyze the major problems confronted by the construction and systematically locate disaster sources. In addition, the risk level should be reasonably ranked, responsibility should be clearly identified, and a hierarchical-control mechanism should be established. Several techniques are put forward in this paper to achieve the objectives mentioned above; these include advanced geological prospecting techniques, intelligent tunneling techniques combined with the sensing and fusion of information about rock parameters and mechanical parameters, monitoring and early-warning techniques, and modern information technologies. The application of these techniques offers scientific guidance for risk control and puts forward technical ideas about improving the efficiency of safe tunneling. These techniques and ideas have great significance for the development of modern tunneling technologies and research into major

  1. Use of the "dual construct" for the management of complex spinal reconstructions.

    Science.gov (United States)

    Shen, Francis H; Qureshi, Rabia; Tyger, Rose; Lehman, Rebecca; Singla, Anuj; Shimer, Adam; Hassanzadeh, Hamid

    2018-03-01

    Surgical management of complex spinal reconstructions remains a clinical challenge, as pseudoarthrosis with subsequent rod breakage can occur. Increased rod density in the form of "satellite" or "outrigger" rods have been described; however, rod-fracture above or below satellite rods persist and can result in dissociation of the construct, loss of correction, and recurrence of deformity. The use of four distinct and mechanically independent rods (dual construct) reduces this concern. Since the original case description in 2006, there have been no other studies that use the dual construct for the surgical management of complex spinal reconstructions. The purpose of this study is to review the long-term experience and surgical technique using the dual construct, and to present our complications, rod fracture rates, and outcomes for the surgical management of complex spinal reconstructions. This study used a surgical technique with case series outcomes. Patients were from a single-institute who underwent dual construct between 2010 and 2014 and who were available for 2-year follow-up. Radiographic and functional outcomes, complications, rod fracture rates, and revision surgery rates were the outcome measures. A retrospective review was conducted from a single institution between 2010 and 2014, with a subsequent 2-year follow-up period. Extensive review of patients' medical record, radiographs, and advanced imaging where available was performed. Medical record was evaluated for patient demographics, surgical procedure, and complications. Radiographic measurements included presence or absence of implant failure and proximal junctional kyphosis or distal junctional kyphosis. A total of 36 patients underwent surgical reconstruction. The average estimated blood loss was 1,856 cc (range, 400-4,000 cc). The average length of stay was 7.3 days (range, 4-22 days). Clinical follow-up reported 21 patients (58.3%) with no or minimal pain. There were six deaths during the

  2. Distributed Global Transaction Support for Workflow Management Applications

    NARCIS (Netherlands)

    Vonk, J.; Grefen, P.W.P.J.; Boertjes, E.M.; Apers, Peter M.G.

    Workflow management systems require advanced transaction support to cope with their inherently long-running processes. The recent trend to distribute workflow executions requires an even more advanced transaction support system that is able to handle distribution. This paper presents a model as well

  3. Review of Solid Waste Management Practice, Handling and Planning in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Fiza Mohd Noh

    2017-11-01

    Full Text Available The building and construction industry is a major contributor to the source of national economy. However, inappropriate construction waste management lead to various problems such as illegal dumping along the roadsides, demolition waste and disposal of construction at landfills that Malaysia is facing serious shortage of landfill space and recently the issue has become more serious throughout the country, which these have caused major government sources and environmental issue. Solid waste management is one of the environmental issues which always been a concerned to most governments. In urban areas, 46% of the population in the statistics that shows the world population has reached six billion. In 1997, generation of the municipal solid waste was about 0.49 billion tons around the globe with an estimated annual growth rate of 3.2-4.5% in develop nations and 2-3% in developing countries. The characteristics of solid waste generated were changed due to the rapid urbanization and industrialization.

  4. Educational support programs: Office of Civilian Radioactive Waste Management

    International Nuclear Information System (INIS)

    Williamson, R.C.

    1989-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) currently sponsors two educationally related programs: the Radioactive Waste Management Fellowship Program and the Radioactive Waste Management Research Program for Historically Black Colleges and Universities (HBCU). The graduate fellowship program was implemented in 1985 to meet the US Department of Energy's (DOE's) expected manpower needs for trained scientists and engineers to assist in carrying out the activities of the Nuclear Waste Policy Act. It is recognized that a shortage of master's and doctoral level scientists and engineers in disciplines supportive of the nation's high-level radioactive waste management (RWM) program may impede the DOE's ability to properly carry out its mission under the act. The fellowship program encourages talented undergraduate students to enter graduate programs designed to educate and train them in fields directly related to RWM. The program supports graduate students in various disciplines, including nuclear science and engineering, health physics, and certain area of geology and chemical engineering. It also encourages universities to support and improve research activities and academic programs related to the management of spent nuclear fuel and high-level radioactive waste

  5. A Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site

    Directory of Open Access Journals (Sweden)

    Ali Asghar Najafpoor

    2014-09-01

    Full Text Available Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated with transportation, disposal or recycling of wastes. The present study is aimed to identify activities generating the wastes in design, transportation and storage and procurement of building materials. Materials and Methods: This was questionnaire survey. A total of 94 professionals in the construction industry were attended in this study. To determine the validity and reliability of the instrument, content validity method and Cronbach’s alpha coefficient (0.79 were used. Data were analyzed using SPSS for Windows. Frequencies, percentage, mean and standard deviation were determined in this research. Results: The results showed that handling and storage have been chosen as the most causative factor of waste production in construction activity. Improper material storage was identified major factor in producing waste in handling and storage phase. Usage of low-quality material in design stage and material price changes in procurement were recognized as major causes of waste production in these stages. Conclusion: All studied phases in this research were identified as causative factors in producing of waste. Identifying causes of construction waste production will help us decide better how to control this sort of wastes.

  6. Use of communication technologies in document exchange for the management of construction projects

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2016-06-01

    Full Text Available Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  7. Use of communication technologies in document exchange for the management of construction projects

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2016-06-01

    Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  8. IT support for emergency management - ISEM

    International Nuclear Information System (INIS)

    Andersen, V.

    1990-11-01

    The project is aimed at the development of an integrated information system capable of supporting the complex, dynamic distributed decision making in the management of emergencies. Emphasis will be put on definition of a system architecture and on development of an application generator and tools to support the full life cycle of the system. The development will be driven by the requirements derived from emergency organisations in two different industries. Care is taken that the results are easily applicable and adaptable to other organisations. (author)

  9. Comparison of scenarios for the integrated management of construction and demolition waste by life cycle assessment: A case study in Brazil.

    Science.gov (United States)

    Penteado, Carmenlucia Santos Giordano; Rosado, Laís Peixoto

    2016-10-01

    Brazil, as a result of economic development and strengthening of the construction industry in recent years, is generating an increasing amount of construction and demolition waste (CDW). Hence, environmental assessment of the management systems is vital. A life cycle assessment (LCA) is presented of CDW management in a medium-sized municipality located in the southeast region of Brazil, where the impacts of leaching were not considered due to absence of consistent data. Six different proposed scenarios for the current CDW management situation have been considered. These scenarios comprised the combined use of landfilling, sorting, and recycling, and the use of CDW as paving material for landfill roads, in different percentages. Considering 0.8 ton of waste as the functional unit, the life cycle inventory was performed using primary data obtained from field survey and secondary data from the database Ecoinvent version 3.1, and from the literature. The method CML 2 baseline 2001 was used for environmental impacts evaluation. The results highlight that recycling is beneficial when efficient CDW sorting takes place at construction sites, avoiding the transport of refuse to sorting and recycling facilities, and the distance between the generation source and the recycling unit is within 30 km. Thus, our results are helpful to ensure that the decision-making processes are based on environmental and technical aspects, and not only on economic and political factors, and also provide data and support for other LCA studies on CDW. © The Author(s) 2016.

  10. 75 FR 60480 - Concrete and Masonry Construction; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2010-09-30

    ...] Concrete and Masonry Construction; Extension of the Office of Management and Budget's (OMB) Approval of... requirements specified in the Standard on Concrete and Masonry Construction (29 CFR part 1926, subpart Q..., screens or pumps used for concrete and masonry construction) specified by paragraphs 1926.702(a)(2), (j)(1...

  11. [Knowledge management system for laboratory work and clinical decision support].

    Science.gov (United States)

    Inada, Masanori; Sato, Mayumi; Yoneyama, Akiko

    2011-05-01

    This paper discusses a knowledge management system for clinical laboratories. In the clinical laboratory of Toranomon Hospital, we receive about 20 questions relevant to laboratory tests per day from medical doctors or co-medical staff. These questions mostly involve the essence to appropriately accomplish laboratory tests. We have to answer them carefully and suitably because an incorrect answer may cause a medical accident. Up to now, no method has been in place to achieve a rapid response and standardized answers. For this reason, the laboratory staff have responded to various questions based on their individual knowledge. We began to develop a knowledge management system to promote the knowledge of staff working for the laboratory. This system is a type of knowledge base for assisting the work, such as inquiry management, laboratory consultation, process management, and clinical support. It consists of several functions: guiding laboratory test information, managing inquiries from medical staff, reporting results of patient consultation, distributing laboratory staffs notes, and recording guidelines for laboratory medicine. The laboratory test information guide has 2,000 records of medical test information registered in the database with flexible retrieval. The inquiry management tool provides a methos to record all questions, answer easily, and retrieve cases. It helps staff to respond appropriately in a short period of time. The consulting report system treats patients' claims regarding medical tests. The laboratory staffs notes enter a file management system so they can be accessed to aid in clinical support. Knowledge sharing using this function can achieve the transition from individual to organizational learning. Storing guidelines for laboratory medicine will support EBM. Finally, it is expected that this system will support intellectual activity concerning laboratory work and contribute to the practice of knowledge management for clinical work support.

  12. Construction of nuclear special information service

    International Nuclear Information System (INIS)

    Oh, Jeong Hoon; Kim, Tae Whan; Lee, Kyu Jeong; Yi, Ji Ho; Chun, Young Choon; Yoo, Jae Bok; Yoo, An Na

    2009-02-01

    Domestic INIS project has carried out various activities on supporting a decision-making for INIS Secretariat, exchanges of the statistical information between INIS and the country,and technical assistance for domestic end-users using INIS database. Based on the construction of INIS database sent by member states, the data published in the country has been gathered, collected, and inputted to INIS database according to the INIS reference series. Using the INIS output data, it has provided domestic users with searching INIS CD-ROM DB, INIS online database, INIS SDI service, and non-conventional literature delivery services. INIS2 DB Host site in Korea has serviced users of domestic and INIS member countries. In order to maintain the same data as Vienna center, the data update process has been performed. Also, publicity information activities were performed by many ways. To construct digital information infrastructure, we changed web server of NUCLIS21 and upgraded information management manager system and constructed full text DB on research and technical reports. Also we collected web DB, digital journals and so on and made an effort on operation of knowledge management system and research documents management. We have inputted over 3,000 records per year since 2002 and the input amount this year has reached 3,738 records. In order to input the comprehensive domestic publication related to nuclear energy, and rise in position of the national center, it is necessary to continue efforts and support budgets. We expect the INIS2 DB Host site will make a contribution to the improvement of productivity in the nuclear energy research as well as the diffusion of information about nuclear energy. We provided users with stable services changing web server of NUCLIS21. Also we contributed to the improvement of librarians' productivity by upgrading information management manager system and provided users with services of web DB, digital journals and so on

  13. Awareness Support in Scientific Event Management with ginkgo

    NARCIS (Netherlands)

    Reinhardt, Wolfgang; Maicher, Julian; Drachsler, Hendrik; Sloep, Peter

    2011-01-01

    Reinhardt, W., Maicher, J., Drachsler, H., & Sloep, P. B. (2011). Awareness Support in Scientific Event Management with ginkgo. In Proceedings of the 11th International Conference on Knowledge Management and Knowledge Technologies (i-Know’11) (pp. 40:1–40:8). New York, NY, USA: ACM.

  14. United nations Supported principles for Responsible Management Education

    DEFF Research Database (Denmark)

    Godemann, Jasmin; Moon, Jeremy; Haertle, Jonas

    2014-01-01

    and various ecological system crises. The United Nations supported Principles for Responsible Management Education (PRME) initiative is an important catalyst for the transformation of management education and a global initiative to change and reform management education in order to meet the increasing......The expectation that management education institutions should be leading thought and action on issues related to corporate responsibility and sustainability has been reinforced in the light of their association with business leaders' failings, including corporate corruption, the financial crisis...

  15. A Research on the Construction of University R&D Management Team in China

    Science.gov (United States)

    Jia, Ning

    2007-01-01

    The system of Chinese universities R&D as a branch of the system of the whole country R&D, has a great effect on the development and innovation of the country's science and technique. Consequently, it's important to construct an effective management team with high diathesis for University R&D management. Based on the statistics of the…

  16. COPD self-management supportive care: chaos and complexity theory.

    Science.gov (United States)

    Cornforth, Amber

    This paper uses the emergent theories of chaos and complexity to explore the self-management supportive care of chronic obstructive pulmonary disease (COPD) patients within the evolving primary care setting. It discusses the concept of self-management support, the complexity of the primary care context and consultations, smoking cessation, and the impact of acute exacerbations and action planning. The author hopes that this paper will enable the acquisition of new insight and better understanding in this clinical area, as well as support meaningful learning and facilitate more thoughtful, effective and high quality patient-centred care within the context of primary care.

  17. Nominal Device Support for ATCA Shelf Manager

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Bruno; Carvalho, Paulo F.; Rodrigues, A.P.; Carvalho, Bernardo B.; Sousa, Jorge; Batista, Antonio J.N.; Combo, Alvaro M.; Cruz, Nuno; Correia, Carlos M.B.A.; Goncalves, Bruno [Instituto de Plasmas e Fusao Nuclear, Instituto Superior Tecnico, Universidade de Lisboa, 1049-001 Lisboa (Portugal); Correia, Miguel [Centro de Instrumentacao, Departamento de Fisica, Universidade de Coimbra, 3004-516 Coimbra (Portugal)

    2015-07-01

    The ATCA standard specifies a mandatory Shelf Manager (ShM) unit which is a key element for the system operation. It includes the Intelligent Platform Management Controller (IPMC) which monitors the system health, retrieves inventory information and controls the Field Replaceable Units (FRUs). These elements enable the intelligent health monitoring, providing high-availability and safety operation, ensuring the correct system operation. For critical systems like ones of tokamak ITER these features are mandatory to support the long pulse operation. The Nominal Device Support (NDS) was designed and developed for the ITER CODAC Core System (CCS), which will be the responsible for plant Instrumentation and Control (I and C), supervising and monitoring on ITER. It generalizes the Enhanced Physics and Industrial Control System (EPICS) device support interface for Data Acquisition (DAQ) and timing devices. However the support for health management features and ATCA ShM are not yet provided. This paper presents the implementation and test of a NDS for the ATCA ShM, using the ITER Fast Plant System Controller (FPSC) prototype environment. This prototype is fully compatible with the ITER CCS and uses the EPICS Channel Access (CA) protocol as the interface with the Plant Operation Network (PON). The implemented solution running in an EPICS Input / Output Controller (IOC) provides Process Variables (PV) to the PON network with the system information. These PVs can be used for control and monitoring by all CA clients, such as EPICS user interface clients and alarm systems. The results are presented, demonstrating the fully integration and the usability of this solution. (authors)

  18. Marital Conflict and Support Seeking by Parents in Adolescence: Empirical Support for the Parentification Construct

    Science.gov (United States)

    Peris, Tara S.; Goeke-Morey, Marcie C.; Cummings, E. Mark; Emery, Robert E.

    2010-01-01

    Parentification, a parent–child dynamic wherein children come to provide ongoing emotional support for their parents, has been documented extensively in the clinical literature; however, it rarely has been studied systematically. Using a community sample of 83 couples and their adolescent children (mean age = 15.26 years; 52% male, 48% female), the authors linked adolescent self-report of parentification to specific youth and adult behaviors using multiple methods and examined its associations with youth adjustment problems. The parentification measure demonstrated strong internal consistency and 1-year stability. Parentification was associated with marital conflict, youth perceptions of threat, low warmth in the parent–child relationship, and the tendency for youths to intervene in marital conflict. Links were also found with youth reports of internalizing and externalizing behavior and poorer competency in close friendships. These findings thus support the parentification construct and provide evidence that parentification may contribute to poor youth outcomes by burdening children with developmentally inappropriate responsibilities. PMID:18729677

  19. ARAC: A support capability for emergency managers

    Energy Technology Data Exchange (ETDEWEB)

    Pace, J.C.; Sullivan, T.J.; Baskett, R.L. [and others

    1995-08-01

    This paper is intended to introduce to the non-radiological emergency management community the 20-year operational history of the Atmospheric Release Advisory Capability (ARAC), its concept of operations, and its applicability for use in support of emergency management decision makers. ARAC is a centralized federal facility for assessing atmospheric releases of hazardous materials in real time, using a robust suite of three-dimensional atmospheric transport and diffusion models, extensive geophysical and source-description databases, automated meteorological data acquisition systems, and experienced staff members. Although originally conceived to respond to nuclear accidents, the ARAC system has proven to be extremely adaptable, and has been used successfully during a wide variety of nonradiological hazardous chemical situations. ARAC represents a proven, validated, operational support capability for atmospheric hazardous releases.

  20. Supporting self-management of chronic health conditions: common approaches.

    Science.gov (United States)

    Lawn, Sharon; Schoo, Adrian

    2010-08-01

    The aims of this paper are to provide a description of the principles of chronic condition self-management, common approaches to support currently used in Australian health services, and benefits and challenges associated with using these approaches. We examined literature in this field in Australia and drew also from our own practice experience of implementing these approaches and providing education and training to primary health care professionals and organizations in the field. Using common examples of programs, advantages and disadvantages of peer-led groups (Stanford Courses), care planning (The Flinders Program), a brief primary care approach (the 5As), motivational interviewing and health coaching are explored. There are a number of common approaches used to enhance self-management. No one approach is superior to other approaches; in fact, they are often complimentary. The nature and context for patients' contact with services, and patients' specific needs and preferences are what must be considered when deciding on the most appropriate support mode to effectively engage patients and promote self-management. Choice of approach will also be determined by organizational factors and service structures. Whatever self-management support approaches used, of importance is how health services work together to provide support. Copyright 2009 Elsevier Ireland Ltd. All rights reserved.

  1. [Construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province].

    Science.gov (United States)

    Zhao-Hui, Zheng; Jun, Qin; Li, Chen; Hong, Zhu; Li, Tang; Zu-Wu, Tu; Ming-Xing, Zeng; Qian, Sun; Shun-Xiang, Cai

    2016-10-09

    To analyze the construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province, so as to provide the reference for the standardized detection and management of schistosomiasis laboratories. According to the laboratory standard of schistosomiasis at provincial, municipal and county levels, the management system construction and operation status of 60 schistosomiasis control institutions was assessed by the acceptance examination method from 2013 to 2015. The management system was already occupied over all the laboratories of schistosomiasis control institutions and was officially running. There were 588 non-conformities and the inconsistency rate was 19.60%. The non-conformity rate of the management system of laboratory quality control was 38.10% (224 cases) and the non-conformity rate of requirements of instrument and equipment was 23.81% (140 cases). The management system has played an important role in the standardized management of schistosomiasis laboratories.

  2. Multiple domains of social support are associated with diabetes self-management among Veterans.

    Science.gov (United States)

    Gray, Kristen E; Hoerster, Katherine D; Reiber, Gayle E; Bastian, Lori A; Nelson, Karin M

    2018-01-01

    Objectives To examine, among Veterans, relationships of general social support and diabetes-specific social support for physical activity and healthy eating with diabetes self-management behaviors. Methods Patients from VA Puget Sound, Seattle completed a cross-sectional survey in 2012-2013 ( N = 717). We measured (a) general social support and (b) diabetes-specific social support for healthy eating and physical activity with domains reflecting support person participation, encouragement, and sharing ideas. Among 189 self-reporting diabetes patients, we fit linear and modified Poisson regression models estimating associations of social support with diabetes self-management behaviors: adherence to general and diabetes-specific diets and blood glucose monitoring (days/week); physical activity (social support was not associated with diabetes self-management. For diabetes-specific social support, higher healthy eating support scores across all domains were associated with better adherence to general and diabetes-specific diets. Higher physical activity support scores were positively associated with ≥150 min/week of physical activity only for the participation domain. Discussion Diabetes-specific social support was a stronger and more consistent correlate of improved self-management than general social support, particularly for lifestyle behaviors. Incorporating family/friends into Veterans' diabetes self-management routines may lead to better self-management and improvements in disease control and outcomes.

  3. Self-Management Support Interventions for Stroke Survivors: A Systematic Meta-Review.

    Directory of Open Access Journals (Sweden)

    Hannah L Parke

    Full Text Available There is considerable policy interest in promoting self-management in patients with long-term conditions, but it remains uncertain whether these interventions are effective in stroke patients.Systematic meta-review of the evidence for self-management support interventions with stroke survivors to inform provision of healthcare services.We searched MEDLINE, EMBASE, CINAHL, PsychINFO, AMED, BNI, Database of Abstracts of Reviews for Effectiveness, and Cochrane Database of Systematic Reviews for systematic reviews of self-management support interventions for stroke survivors. Quality was assessed using the R-AMSTAR tool, and data extracted using a customised data extraction form. We undertook a narrative synthesis of the reviews' findings.From 12,400 titles we selected 13 systematic reviews (published 2003-2012 representing 101 individual trials. Although the term 'self-management' was rarely used, key elements of self-management support such as goal setting, action planning, and problem solving were core components of therapy rehabilitation interventions. We found high quality evidence that supported self-management in the context of therapy rehabilitation delivered soon after the stroke event resulted in short-term (< 1 year improvements in basic and extended activities of daily living, and a reduction in poor outcomes (dependence/death. There is some evidence that rehabilitation and problem solving interventions facilitated reintegration into the community.Self-management terminology is rarely used in the context of stroke. However, therapy rehabilitation currently successfully delivers elements of self-management support to stroke survivors and their caregivers with improved outcomes. Future research should focus on managing the emotional, medical and social tasks of long-term survivorship.

  4. A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste.

    Science.gov (United States)

    Yuan, Hongping; Chini, Abdol R; Lu, Yujie; Shen, Liyin

    2012-03-01

    During the past few decades, construction and demolition (C&D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C&D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C&D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C&D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C&D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity - interrelationships and dynamics - of any social, economic and managerial system. The dynamic model integrates major variables that affect C&D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C&D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only built confidence in the model so that it can be used for quantitative analysis, but also assessed and compared the effect of three designed policy scenarios on C&D waste reduction. One major contribution of this study is the development of a dynamic model for evaluating C&D waste reduction strategies under various scenarios, so that best management strategies could be identified before being implemented

  5. Construction and application research of Three-dimensional digital power grid in Southwest China

    Science.gov (United States)

    Zhou, Yang; Zhou, Hong; You, Chuan; Jiang, Li; Xin, Weidong

    2018-01-01

    With the rapid development of Three-dimensional (3D) digital design technology in the field of power grid construction, the data foundation and technical means of 3D digital power grid construction approaches perfection. 3D digital power grid has gradually developed into an important part of power grid construction and management. In view of the complicated geological conditions in Southwest China and the difficulty in power grid construction and management, this paper is based on the data assets of Southwest power grid, and it aims at establishing a 3D digital power grid in Southwest China to provide effective support for power grid construction and operation management. This paper discusses the data architecture, technical architecture and system design and implementation process of the 3D digital power grid construction through teasing the key technology of 3D digital power grid. The application of power grid data assets management, transmission line corridor planning, geological hazards risk assessment, environmental impact assessment in 3D digital power grid are also discussed and analysed.

  6. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  7. Forecasting of construction and demolition waste in Brazil.

    Science.gov (United States)

    Paz, Diogo Hf; Lafayette, Kalinny Pv

    2016-08-01

    The objective of this article is to develop a computerised tool (software) that facilitates the analysis of strategies for waste management on construction sites through the use of indicators of construction and demolition waste generation. The development involved the following steps: knowledge acquisition, structuring the system, coding and system evaluation. The step of knowledge acquisition aims to provide subsidies for the representation of them through models. In the step of structuring the system, it was presented the structuring and formalisation of knowledge for the development of the system, and has two stages: the construction of the conceptual model and the subsequent instantiation of the model. The coding system aims to implement (code) the conceptual model developed in a model played by computer (digital). The results showed that the system is very useful and applicable in construction sites, helping to improve the quality of waste management, and creating a database that will support new research. © The Author(s) 2016.

  8. Mathematical Methods of Managing Economic Sustainability of the Construction Company

    Science.gov (United States)

    Kostuchenko, Vasiliy; Zdanov, Andrej; Rodionov, Anatolij

    2017-10-01

    This article presents a long-term research in developing innovative mathematical techniques of managing the contractor’s economic sustainability proven by some experimental studies. The article aims at presenting some practical results of applying these techniques to the scientific community. This research presents a description of some applied mathematical models, views, and some results of their practical application in the applied field for the purposes of evaluating operational sustainability and minimizing losses in the process of managing the company. The authors have put the technology they have developed to practical use, and the article presents the results of such application. The authors have put the developed technology to practical use. Company management also means the management of power consumption, which is highly vital both for the construction and maintenance of buildings and structures. The articles also dwell on some possible improvements of managing energy consumption within the framework of the general management of company’s economic sustainability, because these phenomena have a tight organic interdependence. The authors continue researching this direction in order to improve the production efficiency of the proposed technologies as well as to eliminate some drawbacks they have spotted.

  9. Decision Support Model for Optimal Management of Coastal Gate

    Science.gov (United States)

    Ditthakit, Pakorn; Chittaladakorn, Suwatana

    2010-05-01

    The coastal areas are intensely settled by human beings owing to their fertility of natural resources. However, at present those areas are facing with water scarcity problems: inadequate water and poor water quality as a result of saltwater intrusion and inappropriate land-use management. To solve these problems, several measures have been exploited. The coastal gate construction is a structural measure widely performed in several countries. This manner requires the plan for suitably operating coastal gates. Coastal gate operation is a complicated task and usually concerns with the management of multiple purposes, which are generally conflicted one another. This paper delineates the methodology and used theories for developing decision support modeling for coastal gate operation scheduling. The developed model was based on coupling simulation and optimization model. The weighting optimization technique based on Differential Evolution (DE) was selected herein for solving multiple objective problems. The hydrodynamic and water quality models were repeatedly invoked during searching the optimal gate operations. In addition, two forecasting models:- Auto Regressive model (AR model) and Harmonic Analysis model (HA model) were applied for forecasting water levels and tide levels, respectively. To demonstrate the applicability of the developed model, it was applied to plan the operations for hypothetical system of Pak Phanang coastal gate system, located in Nakhon Si Thammarat province, southern part of Thailand. It was found that the proposed model could satisfyingly assist decision-makers for operating coastal gates under various environmental, ecological and hydraulic conditions.

  10. Efficient Mobility Management Signalling in Network Mobility Supported PMIPV6.

    Science.gov (United States)

    Samuelraj, Ananthi Jebaseeli; Jayapal, Sundararajan

    2015-01-01

    Proxy Mobile IPV6 (PMIPV6) is a network based mobility management protocol which supports node's mobility without the contribution from the respective mobile node. PMIPV6 is initially designed to support individual node mobility and it should be enhanced to support mobile network movement. NEMO-BSP is an existing protocol to support network mobility (NEMO) in PMIPV6 network. Due to the underlying differences in basic protocols, NEMO-BSP cannot be directly applied to PMIPV6 network. Mobility management signaling and data structures used for individual node's mobility should be modified to support group nodes' mobility management efficiently. Though a lot of research work is in progress to implement mobile network movement in PMIPV6, it is not yet standardized and each suffers with different shortcomings. This research work proposes modifications in NEMO-BSP and PMIPV6 to achieve NEMO support in PMIPV6. It mainly concentrates on optimizing the number and size of mobility signaling exchanged while mobile network or mobile network node changes its access point.

  11. Efficient Mobility Management Signalling in Network Mobility Supported PMIPV6

    Directory of Open Access Journals (Sweden)

    Ananthi Jebaseeli Samuelraj

    2015-01-01

    Full Text Available Proxy Mobile IPV6 (PMIPV6 is a network based mobility management protocol which supports node’s mobility without the contribution from the respective mobile node. PMIPV6 is initially designed to support individual node mobility and it should be enhanced to support mobile network movement. NEMO-BSP is an existing protocol to support network mobility (NEMO in PMIPV6 network. Due to the underlying differences in basic protocols, NEMO-BSP cannot be directly applied to PMIPV6 network. Mobility management signaling and data structures used for individual node’s mobility should be modified to support group nodes’ mobility management efficiently. Though a lot of research work is in progress to implement mobile network movement in PMIPV6, it is not yet standardized and each suffers with different shortcomings. This research work proposes modifications in NEMO-BSP and PMIPV6 to achieve NEMO support in PMIPV6. It mainly concentrates on optimizing the number and size of mobility signaling exchanged while mobile network or mobile network node changes its access point.

  12. Support for self-management of cardiovascular disease by people with learning disabilities.

    Science.gov (United States)

    Young, Anita F; Naji, Simon; Kroll, Thilo

    2012-08-01

    Cardiovascular disease (CVD) is the second most common cause of death among people with learning disabilities (LD), and lifestyle has been linked to risk factors. With a shift towards illness prevention and self-management support, it is important to know how people with LD can be involved in this process. To elicit the perceptions of people with LD, carers and health professionals regarding supported self-management of CVD. A qualitative approach used in-depth semi-structured interviews based on vignettes with accompanying pictures. Fourteen people with LD, 11 carers/care staff and 11 health professionals were recruited and interviewed. Thematic framework analysis was used to analyse interview data. In total, 11 men and 25 women were interviewed. All respondents contributed views of self-management with a wide range of opinions expressed within each participant group. Four key themes encompassed: strategies for self-management; understanding the prerequisites for self-management support; preferred supporters and challenges for self-management implementation. Facilitated service user involvement in self-management decision making was highly valued in all groups. Service users wished for co-ordinated incremental support from across agencies and individuals. People with LD can be effectively consulted regarding health management and their views can inform service development. Promoting joined-up support across health and social care and families will require investment in resources, education and dismantling of professional barriers.

  13. Training Support for Crisis Managers with Elements of Serious Gaming

    OpenAIRE

    Havlik , Denis; Deri , Oren; Rannat , Kalev; Warum , Manuel; Rafalowski , Chaim; Taveter , Kuldar; Kutschera , Peter; Meriste , Merik

    2015-01-01

    Part 3: Decision Support Tools and Systems; International audience; This paper presents a methodology and a prototypic software implementation of a simple system supporting resource management training for crisis managers. The application that is presented supports the execution and assessment of a desktop training for decision makers on a tactical and strategic level. It introduces elements of turn-based strategic “serious gaming”, with a possibility to roll back in time and re-try new decis...

  14. The role of knowledge management tools in supporting sustainable forest management

    OpenAIRE

    Vacik, H.; Torresan, C.; Hujala, T.; Khadka, C.; Reynolds, K.

    2013-01-01

    Aim of study: Knowledge Management (KM) tools facilitate the implementation of knowledge processes by identifying, creating, structuring, and sharing knowledge through use of information technology in order to improve decision-making. In this contribution, we review the way in which KM tools and techniques are used in forest management, and categorize a selected set of them according to their contribution to support decision makers in the phases of problem identification, problem modelling, a...

  15. Experiences from implementation of ICT for resource management in small construction companies

    DEFF Research Database (Denmark)

    Svidt, Kjeld; Christiansson, Per

    2006-01-01

    This paper summarizes experiences from the process of implementation of ICT-based systems for resource management in small construction companies. The initial decision process, system requirements specification and integration, education and staff training, and end user experiences were followed ...

  16. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  17. Constructing Support Vector Machine Ensembles for Cancer Classification Based on Proteomic Profiling

    Institute of Scientific and Technical Information of China (English)

    Yong Mao; Xiao-Bo Zhou; Dao-Ying Pi; You-Xian Sun

    2005-01-01

    In this study, we present a constructive algorithm for training cooperative support vector machine ensembles (CSVMEs). CSVME combines ensemble architecture design with cooperative training for individual SVMs in ensembles. Unlike most previous studies on training ensembles, CSVME puts emphasis on both accuracy and collaboration among individual SVMs in an ensemble. A group of SVMs selected on the basis of recursive classifier elimination is used in CSVME, and the number of the individual SVMs selected to construct CSVME is determined by 10-fold cross-validation. This kind of SVME has been tested on two ovarian cancer datasets previously obtained by proteomic mass spectrometry. By combining several individual SVMs, the proposed method achieves better performance than the SVME of all base SVMs.

  18. Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain

    Directory of Open Access Journals (Sweden)

    Ana Jiménez-Rivero

    2017-03-01

    Full Text Available On-site management of construction waste commonly determines its destination. In the case of plasterboard (PB, on-site segregation becomes crucial for closed-loop recycling. However, PB is commonly mixed with other wastes in Spain. In this context, the involvement of stakeholders that can contribute to reversing this current situation is needed. This paper analyzes on-site waste management of PB in Spain through a pilot study of a construction site, with the main objective of identifying best practices to increase waste prevention, waste minimization, and the recyclability of the waste. On-site visits and structured interviews were conducted. The results show five management stages: PB distribution (I; PB installation (II; Construction waste storage at the installation area (III; PB waste segregation at the installation area (IV and PB waste transfer to the PB container and storage (V. The proposed practices refer to each stage and include the merging of Stages III and IV. This measure would avoid the mixing of waste fractions in Stage III, maximizing the recyclability of PB. In addition, two requisites for achieving enhanced management are analyzed: ‘Training and commitment’ and ‘fulfilling the requirements established by the current regulation’. The results show that foremen adopted a more pessimistic attitude than installers towards a joint commitment for waste management. Moreover, not all supervisors valued the importance of a site waste management plan, regulated by the Royal Decree 105/2008 in Spain.

  19. NEW INSTRUMENTS FOR MANAGEMENT OF CONSTRUCTION PROGRAMS AND PROJECTS IN THE NEW ECONOMY STRUCTURE

    Directory of Open Access Journals (Sweden)

    Silka Dmitriy Nikolaevich

    2017-11-01

    Full Text Available Subject: the new economy structure is directly related to the active application of digital technologies. Economic processes are more formalized and for making administrative decisions it becomes possible to operate in a greater degree with precise criteria and information than probabilistic assumptions. As a subject of research, new tools for managing construction programs and projects are presented. Research objectives: the purpose of the study is to formulate general principles and directions for the digitization of economic relations in investment and construction activities to ensure the effectiveness of implementation of new generation projects. Materials and methods: to achieve the goal, the article shows the composition of state programs and projects in the construction sector and the system problems of their implementation. Organizational methods of increasing their effectiveness are considered. Results: the most promising areas of implementation of new management tools for investment and construction programs and projects are identified. Conclusions: the article shows the current dynamics of changes in technical and socio-economic systems at the level of construction sector. It is pointed out that the tasks of socio-economic nature require the development of unique approaches since the peculiarities of Russian legislation, of the prevailing norms and rules of economic activity prevent the direct replication of successful foreign experience.

  20. GIS-based planning system for managing the flow of construction and demolition waste in Brazil.

    Science.gov (United States)

    Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo

    2018-05-01

    The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.