WorldWideScience

Sample records for supply system reliability

  1. Assessing reliability in energy supply systems

    International Nuclear Information System (INIS)

    McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

    2007-01-01

    Reliability has always been a concern in the energy sector, but concerns are escalating as energy demand increases and the political stability of many energy supply regions becomes more questionable. But how does one define and measure reliability? We introduce a method to assess reliability in energy supply systems in terms of adequacy and security. It derives from reliability assessment frameworks developed for the electricity sector, which are extended to include qualitative considerations and to be applicable to new energy systems by incorporating decision-making processes based on expert opinion and multi-attribute utility theory. The method presented here is flexible and can be applied to any energy system. To illustrate its use, we apply the method to two hydrogen pathways: (1) centralized steam reforming of imported liquefied natural gas with pipeline distribution of hydrogen, and (2) on-site electrolysis of water using renewable electricity produced independently from the electricity grid

  2. Maximising water supply system yield subject to multiple reliability ...

    African Journals Online (AJOL)

    Maximising water supply system yield subject to multiple reliability constraints via simulation-optimisation. ... Water supply systems have to satisfy different demands that each require various levels of reliability ... and monthly operating rules that maximise the yield of a water supply system subject to ... HOW TO USE AJOL.

  3. Creation of reactor's reliable system of emergency energy supply

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Brovkin, A.Yu.; Petukhov, V.K.; Chekushin, A.I.; Chernyaev, V.P.; Yagotinets, N.A.

    1998-01-01

    System of reliable power supply of the WWR-K reactor complex is described, which completely provides safety operation of reactor equipment in the case of total voltage loss from external power transmission lines as well as under destruction of accumulation batteries by earthquake more than 6 balls. Switching on in operation of diesel-generators and system of constant current supply from accumulator batteries is occurred automatically under cessation of voltage supply from centralized power system. Reliable reactor dampening in case it work on capacity has been ensured. Reactor cooling under its emergency shutdown during both the partial or the total loss of coolant in first counter has been carried out. Under full coolant loss the system of emergency reactor cooling has been switched on in operation

  4. Modelling Reliability of Supply and Infrastructural Dependency in Energy Distribution Systems

    OpenAIRE

    Helseth, Arild

    2008-01-01

    This thesis presents methods and models for assessing reliability of supply and infrastructural dependency in energy distribution systems with multiple energy carriers. The three energy carriers of electric power, natural gas and district heating are considered. Models and methods for assessing reliability of supply in electric power systems are well documented, frequently applied in the industry and continuously being subject to research and improvement. On the contrary, there are compar...

  5. Small nuclear power reactor emergency electric power supply system reliability comparative analysis

    International Nuclear Information System (INIS)

    Bonfietti, Gerson

    2003-01-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  6. Supply chain reliability modelling

    Directory of Open Access Journals (Sweden)

    Eugen Zaitsev

    2012-03-01

    Full Text Available Background: Today it is virtually impossible to operate alone on the international level in the logistics business. This promotes the establishment and development of new integrated business entities - logistic operators. However, such cooperation within a supply chain creates also many problems related to the supply chain reliability as well as the optimization of the supplies planning. The aim of this paper was to develop and formulate the mathematical model and algorithms to find the optimum plan of supplies by using economic criterion and the model for the probability evaluating of non-failure operation of supply chain. Methods: The mathematical model and algorithms to find the optimum plan of supplies were developed and formulated by using economic criterion and the model for the probability evaluating of non-failure operation of supply chain. Results and conclusions: The problem of ensuring failure-free performance of goods supply channel analyzed in the paper is characteristic of distributed network systems that make active use of business process outsourcing technologies. The complex planning problem occurring in such systems that requires taking into account the consumer's requirements for failure-free performance in terms of supply volumes and correctness can be reduced to a relatively simple linear programming problem through logical analysis of the structures. The sequence of the operations, which should be taken into account during the process of the supply planning with the supplier's functional reliability, was presented.

  7. TFTR CAMAC power supplies reliability

    International Nuclear Information System (INIS)

    Camp, R.A.; Bergin, W.

    1989-01-01

    Since the expected life of the Tokamak Fusion Test Reactor (TFTR) has been extended into the early 1990's, the issues of equipment wear-out, when to refurbish/replace, and the costs associated with these decisions, must be faced. The management of the maintenance of the TFTR Central Instrumentation, Control and Data Acquisition System (CICADA) power supplies within the CAMAC network is a case study of a set of systems to monitor repairable systems reliability, costs, and results of action. The CAMAC network is composed of approximately 500 racks, each with its own power supply. By using a simple reliability estimator on a coarse time interval, in conjunction with determining the root cause of individual failures, a cost effective repair and maintenance program has been realized. This paper describes the estimator, some of the specific causes for recurring failures and their correction, and the subsequent effects on the reliability estimator. By extension of this program the authors can assess the continued viability of CAMAC power supplies into the future, predicting wear-out and developing cost effective refurbishment/replacement policies. 4 refs., 3 figs., 1 tab

  8. Reliability analysis for power supply system in a reprocessing facility based on GO methodology

    International Nuclear Information System (INIS)

    Wang Renze

    2014-01-01

    GO methodology was applied to analyze the reliability of power supply system in a typical reprocessing facility. Based on the fact that tie breakers are set in the system, tie breaker operator was defined. Then GO methodology modeling and quantitative analysis were performed sequently, minimal cut sets and average unavailability of the system were obtained. Parallel analysis between GO methodology and fault tree methodology was also performed. The results showed that setup of tie breakers was rational and necessary and that the modeling was much easier and the chart was much more succinct for GO methodology parallel with fault tree methodology to analyze the reliability of the power supply system. (author)

  9. Optimal design of water supply networks for enhancing seismic reliability

    International Nuclear Information System (INIS)

    Yoo, Do Guen; Kang, Doosun; Kim, Joong Hoon

    2016-01-01

    The goal of the present study is to construct a reliability evaluation model of a water supply system taking seismic hazards and present techniques to enhance hydraulic reliability of the design into consideration. To maximize seismic reliability with limited budgets, an optimal design model is developed using an optimization technique called harmony search (HS). The model is applied to actual water supply systems to determine pipe diameters that can maximize seismic reliability. The reliabilities between the optimal design and existing designs were compared and analyzed. The optimal design would both enhance reliability by approximately 8.9% and have a construction cost of approximately 1.3% less than current pipe construction cost. In addition, the reinforcement of the durability of individual pipes without considering the system produced ineffective results in terms of both cost and reliability. Therefore, to increase the supply ability of the entire system, optimized pipe diameter combinations should be derived. Systems in which normal status hydraulic stability and abnormal status available demand could be maximally secured if configured through the optimal design. - Highlights: • We construct a seismic reliability evaluation model of water supply system. • We present technique to enhance hydraulic reliability in the aspect of design. • Harmony search algorithm is applied in optimal designs process. • The effects of the proposed optimal design are improved reliability about by 9%. • Optimized pipe diameter combinations should be derived indispensably.

  10. ASCERTAINMENT OF ELECTRIC-SUPPLY SCHEMES RELIABILITY FOR THE ATOMIC POWER PLANT AUXILIARIES

    Directory of Open Access Journals (Sweden)

    A. L. Starzhinskij

    2015-01-01

    Full Text Available The paper completes ascertainment of electrical-supply scheme reliability for the auxiliaries of a nuclear power plant. Thereat the author considers the system behavior during the block normal operation, carrying out current maintenance, and capital repairs in combination with initiating events. The initiating events for reactors include complete blackout, i.e. the loss of outside power supply (normal and reserve; emergency switching one of the working turbogenerators; momentary dumping the normal rating to the level of auxiliaries with seating the cutout valve of one turbo-generator. The combination of any initiating event with the repairing mode in case of one of the system elements failure should not lead to blackout occurrence of more than one system of the reliable power supply. This requirement rests content with the help of the reliable power supply system self-dependence (electrical and functional and the emergency power-supply operational autonomy (diesel generator and accumulator batteries.The reliability indicators of the power supply system for the nuclear power plant auxiliaries are the conditional probabilities of conjoined blackout of one, two, and three sections of the reliable power supply conditional upon an initiating event emerging and the blackout of one, two, and three reliable power-supply sections under the normal operational mode. Furthermore, they also are the blackout periodicity of one and conjointly two, three, and four sections of normal operation under the block normal operational mode. It is established that the blackout of one bus section of normal operation and one section of reliable power-supply system of the auxiliaries that does not lead to complete blackout of the plant auxiliaries may occur once in three years. The probability of simultaneous power failure of two or three normal-operation sections and of two reliable power-supply sections during the power plant service life is unlikely.

  11. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    Directory of Open Access Journals (Sweden)

    Mark Ndubuka NWOHU

    2007-09-01

    Full Text Available The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. This paper presents an economic framework that can be used to optimize electric power system reliability. Finally the cost models are investigated to take into account the economic analysis of system reliability, which can be periodically updated to improve overall reliability of electric power system.

  12. power system reliability in supplying nuclear reactors

    International Nuclear Information System (INIS)

    Gad, M.M.M.

    2007-01-01

    this thesis presents a simple technique for deducing minimal cut set (MCS) from the defined minimal path set (MPS) of generic distribution system and this technique have been used to evaluate the basic reliability indices of Egypt's second research reactor (ETRR-2) electrical distribution network. the alternative system configurations are then studied to evaluate their impact on service reliability. the proposed MCS approach considers both sustained and temporary outage. the temporary outage constitutes an important parameter in characterizing the system reliability indices for critical load point in distribution system. it is also consider the power quality impact on the reliability indices

  13. LED system reliability

    NARCIS (Netherlands)

    Driel, W.D. van; Yuan, C.A.; Koh, S.; Zhang, G.Q.

    2011-01-01

    This paper presents our effort to predict the system reliability of Solid State Lighting (SSL) applications. A SSL system is composed of a LED engine with micro-electronic driver(s) that supplies power to the optic design. Knowledge of system level reliability is not only a challenging scientific

  14. Reliability analysis of self-supply system of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Kuklik, B.

    The results are summarized of the fault tree analysis of the V-1 power plant self-consumption system. The 6 kV busbars providing power for the main circulating pumps, the steam generator feed pumps and other important components including the 0.4 kV busbars are of the highest importance for nuclear safety. A fault tree analysis was also made of the emergency core cooling system of the reactor. Dangerous faults are defined and fault trees are developed. A brief description is given of the calculation algorithm for a digital computer. Some results are discussed. The calculated reliability of the emergency core cooling system is 10 5 years, of the 6 kV busbars it is 6.6x10 4 years. In case of a permanent or a long-term outage of the 220 kV stand-bye power supply, the system reliability is reduced to 7x10 2 years. (Z.M.)

  15. Fuzzy QFD for supply chain management with reliability consideration

    International Nuclear Information System (INIS)

    Sohn, So Young; Choi, In Su

    2001-01-01

    Although many products are made through several tiers of supply chains, a systematic way of handling reliability issues in a various product planning stage has drawn attention, only recently, in the context of supply chain management (SCM). The main objective of this paper is to develop a fuzzy quality function deployment (QFD) model in order to convey fuzzy relationship between customers needs and design specification for reliability in the context of SCM. A fuzzy multi criteria decision-making procedure is proposed and is applied to find a set of optimal solution with respect to the performance of the reliability test needed in CRT design. It is expected that the proposed approach can make significant contributions on the following areas: effectively communicating with technical personnel and users; developing relatively error-free reliability review system; and creating consistent and complete documentation for design for reliability

  16. Fuzzy QFD for supply chain management with reliability consideration

    Energy Technology Data Exchange (ETDEWEB)

    Sohn, So Young; Choi, In Su

    2001-06-01

    Although many products are made through several tiers of supply chains, a systematic way of handling reliability issues in a various product planning stage has drawn attention, only recently, in the context of supply chain management (SCM). The main objective of this paper is to develop a fuzzy quality function deployment (QFD) model in order to convey fuzzy relationship between customers needs and design specification for reliability in the context of SCM. A fuzzy multi criteria decision-making procedure is proposed and is applied to find a set of optimal solution with respect to the performance of the reliability test needed in CRT design. It is expected that the proposed approach can make significant contributions on the following areas: effectively communicating with technical personnel and users; developing relatively error-free reliability review system; and creating consistent and complete documentation for design for reliability.

  17. Reliability evaluation of power supply and distribution for special heat removal systems in nuclear power stations

    International Nuclear Information System (INIS)

    Jazbec, D.

    1982-01-01

    An example of the power supply and distribution of a Special Emergency Heat Removal System (SEHR) shows how an engineering organization may, with the aid of the analytical method of min-cut sets optimize the system reliability. Herein are given the necessary simple calculation methods. (Auth.)

  18. Application of GO methodology in reliability analysis of offsite power supply of Daya Bay NPP

    International Nuclear Information System (INIS)

    Shen Zupei; Li Xiaodong; Huang Xiangrui

    2003-01-01

    The author applies the GO methodology to reliability analysis of the offsite power supply system of Daya Bay NPP. The direct quantitative calculation formulas of the stable reliability target of the system with shared signals and the dynamic calculation formulas of the state probability for the unit with two states are derived. The method to solve the fault event sets of the system is also presented and all the fault event sets of the outer power supply system and their failure probability are obtained. The resumption reliability of the offsite power supply system after the stability failure of the power net is also calculated. The result shows that the GO methodology is very simple and useful in the stable and dynamic reliability analysis of the repairable system

  19. Hawaii Electric System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Loose, Verne William [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Silva Monroy, Cesar Augusto [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2012-08-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers’ views of reliability “worth” and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers’ views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  20. Hawaii electric system reliability.

    Energy Technology Data Exchange (ETDEWEB)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  1. Spatial distribution of water supply reliability and critical links of water supply to crucial water consumers under an earthquake

    International Nuclear Information System (INIS)

    Wang Yu; Au, S.-K.

    2009-01-01

    This paper describes a process to characterize spatial distribution of water supply reliability among various consumers in a water system and proposes methods to identify critical links of water supply to crucial water consumers under an earthquake. Probabilistic performance of water supply is reflected by the probability of satisfying consumers' water demand, Damage Consequence Index (DCI) and Upgrade Benefit Index (UBI). The process is illustrated using a hypothetical water supply system, where direct Monte Carlo simulation is used for estimating the performance indices. The reliability of water supply to consumers varies spatially, depending on their respective locations in the system and system configuration. The UBI is adopted as a primary index in the identification of critical links for crucial water consumers. A pipe with a relatively large damage probability is likely to have a relatively large UBI, and hence, to be a critical link. The concept of efficient frontier is employed to identify critical links of water supply to crucial water consumers. It is found that a group of links that have the largest UBI individually do not necessarily have the largest group UBI, or be the group of critical links

  2. Reliability analysis of the automatic control and power supply of reactor equipment

    International Nuclear Information System (INIS)

    Monori, Pal; Nagy, J.A.; Meszaros, Zoltan; Konkoly, Laszlo; Szabo, Antal; Nagy, Laszlo

    1988-01-01

    Based on reliability analysis the shortcomings of nuclear facilities are discovered. Fault tree types constructed for the technology of automatic control and for power supply serve as input data of the ORCHARD 2 computer code. In order to charaterize the reliability of the system, availability, failure rates and time intervals between failures are calculated. The results of the reliability analysis of the feedwater system of the Paks Nuclear Power Plant showed that the system consisted of elements of similar reliabilities. (V.N.) 8 figs.; 3 tabs

  3. Supply reliability in context to quality regulation. Forecast model for the supply reliability; Versorgungszuverlaessigkeit im Kontext der Qualitaetsregulierung. Prognosemodell fuer die Versorgungszuverlaessigkeit

    Energy Technology Data Exchange (ETDEWEB)

    Quadflieg, Dieter [VDE, Berlin (Germany). FNN-Projektgruppe ' ' Einflussgroessen auf die Versorgungszuverlaessigkeit' '

    2011-11-14

    The forum network technology / network operations in VDE (FNN) has published a technical note on supply reliability in the context of quality regulation. In the underlying investigations, on the one hand the influencing variables on the supply reliability are analyzed on the basis of FNN fault and availability statistics. On the other stochastic methods are developed that allow a prediction of the stochastic reliability characteristics of each network operator.

  4. Reliability analysis of Diesel Generator power supply system of Prototype Fast Breeder Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, Pramod Kumar, E-mail: pramodks@igcar.gov.in; Bhuvana, V.; Ramakrishnan, M.

    2016-12-15

    Highlights: • The unavailability of DG success is 4.75E−3 for 2/4 and 1.47E−3 for 1/4. • Modeling includes sub systems like CB, SSWS, Fuel oil system & 220 V DC. • DG-FR, DG-FR-CCF and DG maintenance is major contributors of DG unavailability. • Uncertainty analysis has been carried out through Monte Carlo simulations. • Sensitivity analysis identifies DG mechanical FR as most sensitive part. - Abstract: The unavailability of Diesel Generator power supply system has been evaluated using Fault tree method with ISOGRAPH reliability software and is found to be 4.75E−3 for 2/4 (DG success) and 1.47E−3 for 1/4 (DG success). Common cause failures contribute significantly to the unavailability of the system. Statistical analysis indicates that the DG unavailability is uncertain by Error Factor 4.4 (90% confidence bound) for 2 out of 4 DG system (system success) and by Error Factor 4.1 (90% confidence bound) for 1 out of 4 DG system (system success). Support systems namely Safety related service water system, Fuel oil system and circuit breaker control power supply dependency have been modeled. Results of importance analysis and sensitivity study are used to identify significant contributors to unavailability. DG fails to run, DG fails to run due to CCF and DG maintenance out of service is identified as dominant and important contributors of DG unavailability. Uncertainty analysis has been carried out through Monte Carlo simulations.

  5. Application of SAW method for multiple-criteria comparative analysis of the reliability of heat supply organizations

    Science.gov (United States)

    Akhmetova, I. G.; Chichirova, N. D.

    2016-12-01

    Heat supply is the most energy-consuming sector of the economy. Approximately 30% of all used primary fuel-and-energy resources is spent on municipal heat-supply needs. One of the key indicators of activity of heat-supply organizations is the reliability of an energy facility. The reliability index of a heat supply organization is of interest to potential investors for assessing risks when investing in projects. The reliability indices established by the federal legislation are actually reduced to a single numerical factor, which depends on the number of heat-supply outages in connection with disturbances in operation of heat networks and the volume of their resource recovery in the calculation year. This factor is rather subjective and may change in a wide range during several years. A technique is proposed for evaluating the reliability of heat-supply organizations with the use of the simple additive weighting (SAW) method. The technique for integrated-index determination satisfies the following conditions: the reliability level of the evaluated heat-supply system is represented maximum fully and objectively; the information used for the reliability-index evaluation is easily available (is located on the Internet in accordance with demands of data-disclosure standards). For reliability estimation of heat-supply organizations, the following indicators were selected: the wear of equipment of thermal energy sources, the wear of heat networks, the number of outages of supply of thermal energy (heat carrier due to technological disturbances on heat networks per 1 km of heat networks), the number of outages of supply of thermal energy (heat carrier due to technologic disturbances on thermal energy sources per 1 Gcal/h of installed power), the share of expenditures in the cost of thermal energy aimed at recovery of the resource (renewal of fixed assets), coefficient of renewal of fixed assets, and a coefficient of fixed asset retirement. A versatile program is developed

  6. The supply of medical radioisotopes - The Path to Reliability

    International Nuclear Information System (INIS)

    2011-01-01

    The reliable supply of molybdenum-99 ( 99 Mo) and its decay product, technetium-99m ( 99m Tc), is a vital component of modern medical diagnostic practices. Disruptions in the supply chain of these radioisotopes can delay or prevent important medical testing services. Unfortunately, supply reliability has declined over the past decade, due to unexpected or extended shutdowns at the few ageing, 99 Mo-producing, research reactors and processing facilities. These shutdowns have recently created global supply shortages. This report provides the findings and analysis of two years of extensive examination of the 99 Mo/ 99m Tc supply chain by the OECD/NEA High-level Group on the Security of Supply of Medical Radioisotopes (HLG-MR). It puts forth a comprehensive policy approach that would help ensure long-term supply security of 99 Mo/ 99m Tc, detailing the essential steps to be taken by governments, industry and the health community to address the vulnerabilities of the supply chain, including its economic structure. (authors)

  7. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  8. Problems and solutions of reliability issues for external power supply in the coal mines

    Directory of Open Access Journals (Sweden)

    И. Ю. Семыкина

    2017-08-01

    Full Text Available Restructuring of the energy sector  and liberalization of the electricity market resulted in separation of a single industry into a multitude of generating companies, federal and interregional distribution utilities, regional power providers and energy suppliers. For a number of reasons, related to the process of managing separate companies, faults in the laws and regulations, and unsatisfactory technical state of the energy equipment both on the part of distributors and consumers, reliability of energy supply faces increasing negative trends, which potentially can lead to big problems. Up to this day the energy sector does not have a developed database on the state of equipment and results of its maintenance, nor has it defined criteria to actually assess technical conditions of the equipment. The authors propose to develop and implement a mechanism aimed at technical auditing and monitoring of the engineering state of external power supply system, whose results can help in the development of more efficient and economically sound measures to improve reliability of energy supply. In recent years, a lot of attention has been paid to the issues of enhanced security of industrial power supply. However, specific characteristics of underground coal mining and enormous work load of the production process limit the applicability of developed methods and algorithms. Existing research does not address economic issues of reliable energy supply, either direct (economic damage from power interruptions, contractual security of supply, tariff regulation or indirect (charges for utility connection with a required level of reliability. There is no explicit definition for the term «autonomous energy source», nor is there a list of power receivers falling into the first and «special» categories according to their reliability. The paper contains a range of urgent problems and solutions that will increase reliability of external power supply in the coal mines.

  9. System Statement of Tasks of Calculating and Providing the Reliability of Heating Cogeneration Plants in Power Systems

    Science.gov (United States)

    Biryuk, V. V.; Tsapkova, A. B.; Larin, E. A.; Livshiz, M. Y.; Sheludko, L. P.

    2018-01-01

    A set of mathematical models for calculating the reliability indexes of structurally complex multifunctional combined installations in heat and power supply systems was developed. Reliability of energy supply is considered as required condition for the creation and operation of heat and power supply systems. The optimal value of the power supply system coefficient F is based on an economic assessment of the consumers’ loss caused by the under-supply of electric power and additional system expences for the creation and operation of an emergency capacity reserve. Rationing of RI of the industrial heat supply is based on the use of concept of technological margin of safety of technological processes. The definition of rationed RI values of heat supply of communal consumers is based on the air temperature level iside the heated premises. The complex allows solving a number of practical tasks for providing reliability of heat supply for consumers. A probabilistic model is developed for calculating the reliability indexes of combined multipurpose heat and power plants in heat-and-power supply systems. The complex of models and calculation programs can be used to solve a wide range of specific tasks of optimization of schemes and parameters of combined heat and power plants and systems, as well as determining the efficiency of various redundance methods to ensure specified reliability of power supply.

  10. Designing reliable supply chain network with disruption risk

    Directory of Open Access Journals (Sweden)

    Ali Bozorgi Amiri

    2013-01-01

    Full Text Available Although supply chains disruptions rarely occur, their negative effects are prolonged and severe. In this paper, we propose a reliable capacitated supply chain network design (RSCND model by considering random disruptions in both distribution centers and suppliers. The proposed model determines the optimal location of distribution centers (DC with the highest reliability, the best plan to assign customers to opened DCs and assigns opened DCs to suitable suppliers with lowest transportation cost. In this study, random disruption occurs at the location, capacity of the distribution centers (DCs and suppliers. It is assumed that a disrupted DC and a disrupted supplier may lose a portion of their capacities, and the rest of the disrupted DC's demand can be supplied by other DCs. In addition, we consider shortage in DCs, which can occur in either normal or disruption conditions and DCs, can support each other in such circumstances. Unlike other studies in the extent of literature, we use new approach to model the reliability of DCs; we consider a range of reliability instead of using binary variables. In order to solve the proposed model for real-world instances, a Non-dominated Sorting Genetic Algorithm-II (NSGA-II is applied. Preliminary results of testing the proposed model of this paper on several problems with different sizes provide seem to be promising.

  11. Early operating and reliability experience with the CEBAF DC magnet power supplies

    International Nuclear Information System (INIS)

    Merz, W.; Flood, R.; Martin, E.J.; O'Sullivan, M.

    1996-01-01

    The CEBAF accelerator is a five pass, recirculating, CW electron linear accelerator. There are a total of nine recirculation arcs connecting the two linacs. Three experimental halls are serviced by the accelerator through separate transport channels. The magnet powering system for CEBAF consists of approximately 2000 independent control channels. About 1850 of these channels are low current, trim magnet power supplies. There are 28 higher power supplies used to energize the major bending elements. Over one hundred, 20 amp, active shunts are used to vary current in selected magnets in the major dipole strings. The majority of the magnetic elements are concentrated in the arcs and transport channels. The correction dipoles, quadrupoles and sextupoles are each powered individually be a dedicated trim power supply channel. The arc and extraction channel dipoles are powered in series strings by the high powered supplies, known locally at CEBAF as 'box power supplies'. Arc loads consist of some 30--40 magnets in series. Transport channel, path length control doglegs and septa box power supplies have loads ranging from 1 to 10 magnets. Shunts are installed on virtually all loads where two or more magnets are in series. At this time, 95% of the power supplies are installed and commissioned. In the past twelve months, beginning in May 1994, approximately 1200 trim magnet power supplies have been checked out. During this same period approximately 22 box power supplies and 100 shunts have been made operational. Full operation of the equipment has only been under way since early 1995. While this operation is only just beginning, much has been learned based on the reliability performance seen so far. The remainder of this paper describes the systems mentioned, their reliability problems, the fixes implemented to date, and some plans for the future. 6 refs., 3 tabs

  12. Reliable Biomass Supply Chain Design under Feedstock Seasonality and Probabilistic Facility Disruptions

    Directory of Open Access Journals (Sweden)

    Zhixue Liu

    2017-11-01

    Full Text Available While biomass has been recognized as an important renewable energy source which has a range of positive impacts on the economy, environment, and society, the existence of feedstock seasonality and risk of service disruptions at collection facilities potentially compromises the efficiency and reliability of the energy supply system. In this paper, we consider reliable supply chain design for biomass collection against feedstock seasonality and time-varying disruption risks. We optimize facility location, inventory, biomass quantity, and shipment decisions in a multi-period planning horizon setting. A real-world case in Hubei, China is studied to offer managerial insights. Our computational results show that: (1 the disruption risk significantly affects both the optimal facility locations and the supply chain cost; (2 no matter how the failure probability changes, setting backup facilities can significantly decrease the total cost; and (3 the feedstock seasonality does not affect locations of the collection facilities, but it affects the allocations of collection facilities and brings higher inventory cost for the biomass supply chain.

  13. Basis for the power supply reliability study of the 1 MW neutron source

    International Nuclear Information System (INIS)

    McGhee, D.G.; Fathizadeh, M.

    1993-01-01

    The Intense Pulsed Neutron Source (IPNS) upgrade to 1 MW requires new power supply designs. This paper describes the tools and the methodology needed to assess the reliability of the power supplies. Both the design and operation of the power supplies in the synchrotron will be taken into account. To develop a reliability budget, the experiments to be conducted with this accelerator are reviewed, and data is collected on the number and duration of interruptions possible before an experiment is required to start over. Once the budget is established, several accelerators of this type will be examined. The budget is allocated to the different accelerator systems based on their operating experience. The accelerator data is usually in terms of machine availability and system down time. It takes into account mean time to failure (MTTF), time to diagnose, time to repair or replace the failed components, and time to get the machine back online. These estimated times are used as baselines for the design. Even though we are in the early stage of design, available data can be analyzed to estimate the MTTF for the power supplies

  14. Defining regulatory requirements for water supply systems in Vietnam

    Directory of Open Access Journals (Sweden)

    Deryushev Leonid Georgiyevich

    2014-01-01

    Full Text Available In the article the authors offer their suggestions for improving the reliability of the standardization requirements for water supply facilities in Vietnam, as an analog of building regulations of Russia 31.13330.2012. In Russia and other advanced countries the reliability of the designed water supply systems is usual to assess quantitatively. Guidelines on the reliability assessment of water supply systems and facilities have been offered by many researchers, but these proposals are not officially approved. Some methods for assessing the reliability of water supply facilities are informally used in practice when describing their quality. These evaluation methods are simple and useful. However, the given estimations defy common sense and regulatory requirements used by all the organizations, ministries and departments, for example, of Russia, in the process of allowances for restoration and repair of water supply facilities. Inadequacy of the water supply facilities assessment is shown on the example of assessing the reliability of pipeline system. If we take MTBF of specific length of the pipeline as reliability index for a pipeline system, for example, 5 km, a pipeline of the similar gauge, material and working conditions with the length of 5 m, according to the estimation on the basis of non-official approach, must have a value of MTBF 1000 times greater than with the length of 5 km. This conclusion runs counter to common sense, for the reason that all the pipes in the area of 5 km are identical, have the same load and rate of wear (corrosion, fouling, deformation, etc.. It was theoretically and practically proved that products of the same type in the same operating conditions (excluding determined impact of a person, work as an entity, which MTBF is equal to the average lifetime. It is proposed to take the average service life as a reliability indicator of a pipeline. Durability, but not failsafety of the pipe guarantees pipeline functioning

  15. Potential for deserts to supply reliable renewable electric power

    Science.gov (United States)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  16. The Path to a Reliable Supply of Medical Radioisotopes

    International Nuclear Information System (INIS)

    Gas, Serge; Westmacott, Chad; Cameron, Ron; Lokhov, Alexey

    2011-06-01

    Medical imaging techniques using technetium-99m account for roughly 80% of all nuclear medicine procedures, representing over 30 million examinations worldwide every year. Disruptions in the supply chain of these medical isotopes - which have half-lives of 66 hours for molybdenum-99 ( 99 Mo) and 6 hours for technetium-99m ( 99m Tc), and thus must be produced continually - can lead to cancellations or delays in important medical testing services. Unfortunately, supply reliability has declined over the past decade, due to unexpected or extended shutdowns at the few ageing, 99 Mo-producing, research reactors and processing facilities. These shutdowns have created global supply shortages. At the request of its member countries, the OECD Nuclear Energy Agency (NEA) established the High-level Group on the Security of Supply of Medical Radioisotopes (HLG-MR) in 2009. During its two-year mandate, the HLG-MR assessed the factors rendering the supply chain vulnerable and identified practical measures - near, medium and long term - to ensure the security of supply of this important medical isotope. Building on its findings and assessments, the HLG-MR developed a comprehensive policy approach to encourage long-term supply security of 99 Mo/' 99m Tc, detailing the essential steps to be taken by governments, industry and the health community to address the vulnerabilities within the supply chain, including changing an economic structure that does not support or reinforce reliable supply

  17. The Economics of Groundwater Replenishment for Reliable Urban Water Supply

    Directory of Open Access Journals (Sweden)

    Lei Gao

    2014-06-01

    Full Text Available This paper explores the potential economic benefits of water banking in aquifers to meet drought and emergency supplies for cities where the population is growing and changing climate has reduced the availability of water. A simplified case study based on the city of Perth, Australia was used to estimate the savings that could be achieved by water banking. Scenarios for investment in seawater desalination plants and groundwater replenishment were considered over a 20 year period of growing demand, using a Monte Carlo analysis that embedded the Markov model. An optimisation algorithm identified the minimum cost solutions that met specified criteria for supply reliability. The impact of depreciation of recharge credits was explored. The results revealed savings of more than A$1B (~US$1B or 37% to 33% of supply augmentation costs by including water banking in aquifers for 95% and 99.5% reliability of supply respectively. When the hypothetically assumed recharge credit depreciation rate was increased from 1% p.a. to 10% p.a. savings were still 33% to 31% for the same reliabilities. These preliminary results show that water banking in aquifers has potential to offer a highly attractive solution for efficiently increasing the security of urban water supplies where aquifers are suitable.

  18. Reliability of dc power supplies in nuclear power plant application

    International Nuclear Information System (INIS)

    Eisenhut, D.G.

    1978-01-01

    In June 1977 the reliability of dc power supplies at nuclear power facilities was questioned. It was postulated that a sudden gross failure of the redundant dc power supplies might occur during normal plant operation, and that this could lead to insufficient shutdown cooling of the reactor core. It was further suggested that this potential for insufficient cooling is great enough to warrant consideration of prompt remedies. The work described herein was part of the NRC staff's efforts aimed towards putting the performance of dc power supplies in proper perspective and was mainly directed towards the particular concern raised at that time. While the staff did not attempt to perform a systematic study of overall dc power supply reliability including all possible failure modes for such supplies, the work summarized herein describes how a probabilistic approach was used to supplement our more usual deterministic approach to reactor safety. Our evaluation concluded that the likelihood of dc power supply failures leading to insufficient shutdown cooling of the reactor core is sufficiently small as to not require any immediate action

  19. Power supply and stabilization of the supply system on board using decentralized voltage rectifiers

    Energy Technology Data Exchange (ETDEWEB)

    Grueb, W; Wegerer, K

    1987-04-01

    The functionally redundant power supply system of the Transrapid 06 II maglev train is described; it comprises four independent, battery-buffered networks and 30 linear generators per train section. Voltage rectifiers adapt the velocity- and load-dependent linear generator voltage to the 440 V d.c. networks and assure dynamic stabilisation as well as buffer battery loading. The result is a high-reliability power supply system on board with optimum utilisation of the power supplied by the linear generators while the train is running.

  20. Performance of different types of renewable power supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Al-Motawakel, M K [Sana' a Univ. (Republic of Yemen). Dept. of Physics; Abu-El-Eizz, H M; Awwad, Z [Zagazig Univ. (EG). Dept. of Physics

    1991-10-01

    In this paper we investigate the performance of a hybrid Photovoltaic (PV)-Wind generator power supply system operating under good and fair insolation and wind regimes. The effectiveness of such a hybrid system is measured by the Relative Sizing Parameter (RSP), Money Saving Parameter (MSP), and the Overall Reliability Parameter (ORP). Under specified weather conditions and for a nominal load demand, the RSP relates the product of the PV-modules and storage batteries involved in sizing the PV-Wind hybrid system to those of a stand alone PV-system sized to meet the same load. The MSP reports the difference between the total costs of a stand-alone PV power supply system and a hybrid PV-Wind power supply system, both sized to meet the same load, as a percentage of the total costs involved in supplying the load with a stand-alone PV power supply system only. The ORP compares the yearly average of the daily excess energy (positive difference between generated and consumed energy) of the hybrid system to that of the stand-alone PV power system. Based on this strategy we were able to develop a number of design diagrams which can be used in judging the benefits of utilizing hybrid PW-Wind generators on both economic and energy reliability grounds. (author).

  1. The impact of faulty response of overload protection systems on the reliability of electricity supply

    International Nuclear Information System (INIS)

    Schweigert, J.; Schnuerer, G.

    1988-01-01

    Protection equipment of the engineered safety system which is to prevent the triggering of actions via signals from the reactor protection system is to be made so reliable that it has no impact on the non-availability of the supplied systems. Design and functional mode of the various overload protection equipment and the relevant switching device and combinations are explained together with the requirements such as choice, design, and adjustment of the protection equipment, followed by a survey of possible causes of faulty response of overload protection device and of the means and measures available for improvement. The now presented version of September 1987 of the 'overload protection report deals basically with all main topics of the Juli 1985 version, but has been updated and extended by material taking into account practice-oriented data on the new developments in convoy power plant design. (orig./HP) [de

  2. Village-level supply reliability of surface water irrigation in rural China: effects of climate change

    Science.gov (United States)

    Li, Yanrong; Wang, Jinxia

    2018-06-01

    Surface water, as the largest part of water resources, plays an important role on China's agricultural production and food security. And surface water is vulnerable to climate change. This paper aims to examine the status of the supply reliability of surface water irrigation, and discusses how it is affected by climate change in rural China. The field data we used in this study was collected from a nine-province field survey during 2012 and 2013. Climate data are offered by China's National Meteorological Information Center which contains temperature and precipitation in the past 30 years. A Tobit model (or censored regression model) was used to estimate the influence of climate change on supply reliability of surface water irrigation. Descriptive results showed that, surface water supply reliability was 74 % in the past 3 years. Econometric results revealed that climate variables significantly influenced the supply reliability of surface water irrigation. Specifically, temperature is negatively related with the supply reliability of surface water irrigation; but precipitation positively influences the supply reliability of surface water irrigation. Besides, climate influence differs by seasons. In a word, this paper improves our understanding of the impact of climate change on agriculture irrigation and water supply reliability in the micro scale, and provides a scientific basis for relevant policy making.

  3. The impact of forest thinning on the reliability of water supply in central Arizona.

    Directory of Open Access Journals (Sweden)

    Silvio Simonit

    Full Text Available Economic growth in Central Arizona, as in other semiarid systems characterized by low and variable rainfall, has historically depended on the effectiveness of strategies to manage water supply risks. Traditionally, the management of supply risks includes three elements: hard infrastructures, landscape management within the watershed, and a supporting set of institutions of which water markets are frequently the most important. In this paper we model the interactions between these elements. A forest restoration initiative in Central Arizona (the Four Forest Restoration Initiative, or 4FRI will result in thinning of ponderosa pine forests in the upper watershed, with potential implications for both sedimentation rates and water delivery to reservoirs. Specifically, we model the net effect of ponderosa pine forest thinning across the Salt and Verde River watersheds on the reliability and cost of water supply to the Phoenix metropolitan area. We conclude that the sediment impacts of forest thinning (up to 50% of canopy cover are unlikely to compromise the reliability of the reservoir system while thinning has the potential to increase annual water supply by 8%. This represents an estimated net present value of surface water storage of $104 million, considering both water consumption and hydropower generation.

  4. The Impact of Forest Thinning on the Reliability of Water Supply in Central Arizona

    Science.gov (United States)

    Simonit, Silvio; Connors, John P.; Yoo, James; Kinzig, Ann; Perrings, Charles

    2015-01-01

    Economic growth in Central Arizona, as in other semiarid systems characterized by low and variable rainfall, has historically depended on the effectiveness of strategies to manage water supply risks. Traditionally, the management of supply risks includes three elements: hard infrastructures, landscape management within the watershed, and a supporting set of institutions of which water markets are frequently the most important. In this paper we model the interactions between these elements. A forest restoration initiative in Central Arizona (the Four Forest Restoration Initiative, or 4FRI) will result in thinning of ponderosa pine forests in the upper watershed, with potential implications for both sedimentation rates and water delivery to reservoirs. Specifically, we model the net effect of ponderosa pine forest thinning across the Salt and Verde River watersheds on the reliability and cost of water supply to the Phoenix metropolitan area. We conclude that the sediment impacts of forest thinning (up to 50% of canopy cover) are unlikely to compromise the reliability of the reservoir system while thinning has the potential to increase annual water supply by 8%. This represents an estimated net present value of surface water storage of $104 million, considering both water consumption and hydropower generation. PMID:25835003

  5. Small nuclear power reactor emergency electric power supply system reliability comparative analysis; Analise da confiabilidade do sistema de suprimento de energia eletrica de emergencia de um reator nuclear de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Bonfietti, Gerson

    2003-07-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  6. A multi-objective reliable programming model for disruption in supply chain

    Directory of Open Access Journals (Sweden)

    Emran Mohammadi

    2013-05-01

    Full Text Available One of the primary concerns on supply chain management is to handle risk components, properly. There are various reasons for having risk in supply chain such as natural disasters, unexpected incidents, etc. When a series of facilities are built and deployed, one or a number of them could probably fail at any time due to bad weather conditions, labor strikes, economic crises, sabotage or terrorist attacks and changes in ownership of the system. The objective of risk management is to reduce the effects of different domains to an acceptable level. To overcome the risk, we propose a reliable capacitated supply chain network design (RSCND model by considering random disruptions risk in both distribution centers and suppliers. The proposed study of this paper considers three objective functions and the implementation is verified using some instance.

  7. Reliability of the electric power supply in the safety apparatus of nuclear power plants: a comparative analysis

    International Nuclear Information System (INIS)

    Cruz, L.A.

    1992-01-01

    This paper discusses the risk of total loss of electric power supply to the Class 1E system. Two alternatives are focused: a system with two off-site and two onsite power supplies emergency power supply, as recommended by the American Regulations, and a system with only one off-site and four on-site power supplies, applicable when two off-site are not available. To allow the fact that the equipment can be repaired, the method proper involves use of the Markov model, with which one can find, for each configuration of the system, the change over time of the probability of a simultaneous failure of all power sources. The sensitivity of each parameter is studied in each case and, on the basis of the results of the study, the author conclude that the system with two off-site power supplies is preferable in all alternatives analysed, although the system with one off-site power supply can be adopted with high reliability diesel-generators. (author)

  8. A model for reliability avaliation of the electrical supply source of the 1A3 and 1A4 control rods assemblies of Angra I reactor

    International Nuclear Information System (INIS)

    Yang, T.

    1978-01-01

    The reliability of the electrical power supply to the 4.16KV buses for the safety system operation of a nuclear power plant was studied. Particularly, Angra Unit I system was focused. Initially, reliability of each electrical supply source was estimated. Using a probabilistic approach based on the Markov processes, the system reliability was evaluated in terms of frequency and duration of loss of power supply and of the system failure probability evolution when one or more sources remained unavailable. Based on these results, certain reactor operating rules were proposed concerning later shutdown of the plant without compromising the nuclear reactor safety. A sensitivity analysis was also performed to show the different reliability parameter influences on final results. This analysis showed that the diesel system performs an important role in the power supply for a nuclear power plant [pt

  9. Monitoring operating temperature and supply voltage in achieving high system dependability

    NARCIS (Netherlands)

    Khan, M.A.; Kerkhoff, Hans G.

    2013-01-01

    System dependability being a set of number of attributes, of which the important reliability, heavily depends on operating temperature and supply voltage. Any change beyond the designed specifications may change the system performance and could result in system reliability and hence dependability

  10. Non-utility generation and demand management reliability of customer delivery systems

    International Nuclear Information System (INIS)

    Hamoud, G.A.; Wang, L.

    1995-01-01

    A probabilistic methodology for evaluating the impact of non-utility generation (NUG) and demand management programs (DMP) on supply reliability of customer delivery systems was presented. The proposed method was based on the criteria that the supply reliability to the customers on the delivery system should not be affected by the integration of either NUG or DMPs. The method considered station load profile, load forecast, and uncertainty in size and availability of the nuio. Impacts on system reliability were expressed in terms of possible delays of the in-service date for new facilities or in terms of an increase in the system load carrying capability. Examples to illustrate the proposed methodology were provided. 10 refs., 8 tabs., 2 figs

  11. TEXT poloidal coil systems power supplies

    International Nuclear Information System (INIS)

    Hutchins, S.H.; Brower, D.F.

    1977-01-01

    TEXT is a convertional iron core tokamak which will have a toroidal field of 3.0 Tesla produced by room temperature copper coils and a maximum plasma current pulse of 400 kA induced by a 40 turn Ohmic Heating coil. The major radius is 100 cm and the minor radius of the plasma is 28 cm. The machine is intended for basic research in tokamak plasma physics and atomic physics and is designed primarily to provide a stable hot plasma, extremely good diagnostic access, and reliable operation. The discharge pulse length will be 300 msec and the repetition period 120 seconds. Power for the toroidal field coils and for the ohmic heating supply is provided by a 100 MVA energy storage alternator. The vertical field, horizontal field, fast positioning, and discharge cleaning power supply systems are powered from the Tokamak Laboratory power mains. The ohmic heating power system consists of an SCR controlled premagnetizing supply and commutation circuit, the main ohmic heating capacitor bank to provide plasma breakdown and current rise, and an SCR controlled power supply which sustains plasma current during the 300 ms pulse. The vertical field power system uses a small capacitor bank and an SCR controlled supply. The horizontal field has a reversible SCR controlled supply, and the fast positioning coils are powered by bipolar output transistor controlled supplies. This paper describes the loads, required wave forms, and the specifications for these power supply systems

  12. Management of natural gas supply reliability and modulation in France

    International Nuclear Information System (INIS)

    Dupas, D.

    1995-01-01

    France imports most of its gas, and demand for gas varies considerably between summer and winter. Faced with insufficient flexibility in its supply contracts to deal with the gas balance, Gaz de France decided to develop a policy based on combined and consistent use of a large-scale underground storage system, a suspendable clientele, and a rate policy to maintain the balance. It was the integrated character of the company that makes it possible to optimize the arrangement of these adjustment facilities. Most of the seasonal modulation is taken up by underground storage in water tables, and the peak cold complement comes from salt dome storage. Underground storage also contributes, as does the suspendable clientele, to supply reliability, with a specific quality due to their speed and versatility of use. The prime purpose of the suspendable clientele portfolio is rather to respond to supply failures, but the demand too, during periods of extreme cold, is reduced by curtailing deliveries whose contractual suspension notice time is short. (author). 3 figs

  13. Climate protection and reliability of supply. Development of a sustainable power supply concept; Klimaschutz und Versorgungssicherheit. Entwicklung einer nachhaltigen Stromversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Klaus, Thomas; Loreck, Charlotte; Mueschen, Klaus

    2009-09-15

    Germany, like other states, committed itself to sustainable development in the Rio declaration of 1992. The boundary conditions for this are set by nature itself, whose laws must be respected if goals like reliability of supply and economic efficiency are to be achieved. This study of the Federal Environmental Office shows how sustainable power supply can be achieved. It is possible to combine climate protection, reliability of supply and economic efficiency, even without nuclear power and without constructing new conventional power plants that do not have the function of combined heat and power generation. (orig.)

  14. ANALYSIS OF POWER SYSTEM RELIABILITY IMPROVEMENT FOR 74-BUS RADIAL DISTRIBUTION SYSTEM

    OpenAIRE

    Su Mon Myint*

    2018-01-01

    In Myanmar, electric power system planning is widely constructed because of more and more load growth and facing with failure of electricity, outage problems and system shut-down. Thus, not only making new power system network but also improving reliability of the existing system using suitable methods is very important to provide an adequate supply of electrical energy to its customers as economically and reliably as possible with an acceptable degree of continuity and quality that is design...

  15. Reliability modelling - PETROBRAS 2010 integrated gas supply chain

    Energy Technology Data Exchange (ETDEWEB)

    Faertes, Denise; Heil, Luciana; Saker, Leonardo; Vieira, Flavia; Risi, Francisco; Domingues, Joaquim; Alvarenga, Tobias; Carvalho, Eduardo; Mussel, Patricia

    2010-09-15

    The purpose of this paper is to present the innovative reliability modeling of Petrobras 2010 integrated gas supply chain. The model represents a challenge in terms of complexity and software robustness. It was jointly developed by PETROBRAS Gas and Power Department and Det Norske Veritas. It was carried out with the objective of evaluating security of supply of 2010 gas network design that was conceived to connect Brazilian Northeast and Southeast regions. To provide best in class analysis, state of the art software was used to quantify the availability and the efficiency of the overall network and its individual components.

  16. Reliability of supply in competitive electricity markets: The Nordic electricity Market

    International Nuclear Information System (INIS)

    Singh, Balbir

    2005-12-01

    An overview of the current regulation and performance of the network utilities with respect to the reliability of supply across Europe in general indicates wide variation. On the regional level the situation in the Nordic market is no exception. Can the variation in reliability of supply in Nordic region be explained by differences in regulatory frameworks in the Nordic countries and is it possible to draw any best practice lessons for other countries and regions? The Norwegian regulation and performance with respect to reliability criterion is encouraging, however it must be emphasized that the Norwegian experience with reliability regulation in its current form covers a period of 3 years, a period that is too short to evaluate the Norwegian model. A closer examination of the Norwegian model reveals dynamic trade off in reliability performance, which if permanent may endanger the reliability of supply in the long-run. Last, but not the least important is the criterion that choice of regulation should be based on a careful social cost-benefit analysis of the regulatory model where both cost incurred by the regulatory agencies and the compliance costs incurred by the regulated utilities are included. A preliminary analysis of regulatory agencies in the Nordic market indicates that Norwegian model of network regulation is quite resource incentive. While it is premature to draw conclusions about the national regulatory mechanisms, the Nordic cross border regulation through voluntary arrangements under the auspices of NORDEL provides a good example of an arrangement that is useful when implementation of a formal regulatory regime across different jurisdiction is not possible

  17. SNS AC Power Distribution and Reliability of AC Power Supply

    CERN Document Server

    Holik, Paul S

    2005-01-01

    The SNS Project has 45MW of installed power. A design description under the Construction Design and Maintenance (CDM) with regard to regulations (OSHA, NFPA, NEC), reliability issues and maintenance of the AC power distribution system are herewith presented. The SNS Project has 45MW of installed power. The Accelerator Systems are Front End (FE)and LINAC KLYSTRON Building (LK), Central Helium Liquefier (CHL), High Energy Beam Transport (HEBT), Accumulator Ring and Ring to Target Beam Transport (RTBT) Support Buildings have 30MW installed power. FELK has 16MW installed, majority of which is klystron and magnet power supply system. CHL, supporting the super conducting portion of the accelerator has 7MW installed power and the RING Systems (HEBT, RING and RTBT) have also 7MW installed power.*

  18. Electrical supply for MFTF-B superconducting magnet system

    International Nuclear Information System (INIS)

    Shimer, D.W.; Owen, E.W.

    1985-01-01

    The MFTF-B magnet system consists of 42 superconducting magnets which must operate continuously for long periods of time. The magnet power supply system is designed to meet the operational requirements of accuracy, flexibility, and reliability. The superconducting magnets require a protection system to protect against critical magnet faults of quench, current lead overtemperature, and overcurrent. The protection system is complex because of the large number of magnets, the strong coupling between magnets, and the high reliability requirement. This paper describes the power circuits and the components used in the design

  19. A physical review on power system reliability factors

    International Nuclear Information System (INIS)

    Navid, Taghizadegan; Ahmad Reza, Zentabchi; Mohammad Ali, Tavakoli; Nader, Samsunchi; Mohammad Ali, Tavakoli

    2005-01-01

    Full text : Planning and design engineers and management must necessarily take into consideration the funds available, the requirements of regulatory agencies and other restrictions that may be imposed, as well as availability of equipment and supplies. A well-designed electrical power system strikes a reasonable between reliability and cost. A prime responsibility of power system operators is to operate their systems in such a way that will provide the maximum reliability of service possible with the facilities under their control

  20. Effects of rainwater harvesting on centralized urban water supply systems

    DEFF Research Database (Denmark)

    Grandet, C.; Binning, Philip John; Mikkelsen, Peter Steen

    2010-01-01

    depths but very different temporal distributions. Supply reliability and the extent of reliance on the public distribution system are identified as suitable performance indicators for mains water infrastructure. A uniform temporal distribution of rainfall in an oceanic climate like that of Dinard......, Northern France, yielded supply reliabilities close to 100% for reasonable tank sizes (0.065 m3/m2 of roof area in Dinard compared with 0.262 m3/m2 in Nice with a RWSO of 30% for a detached house). However, the collection and use of rainfall results in a permanent decrease in mains water demand leading...... to an increase in water age in the distribution network. Investigations carried on a real network showed that water age is greatly affected when rainwater supplies more than 30% of the overall water demand. In urban water utilities planning, rainwater supply systems may however be profitable for the community...

  1. Determination of the Level of Influence of Various Factors on the Reliability of Power System

    Directory of Open Access Journals (Sweden)

    Victor Popescu

    2014-09-01

    Full Text Available Consumers supply with qualitative electric power is one of the priority requirements imposed to power systems. Currently, in electricity networks take place a number of planned and unplanned disconnections, which interrupt the power and affect consumers, causing economic damage. To ensure the quality of power supply it is essential to know the factors that influence the reliability of power systems, which have a visible impact on the variation of reliability of equipment installed in power systems. This paper is devoted to problems of calculation and analysis of power systems reliability and estimation of the impact of various factors that influence the supply of consumers.

  2. Reliability Estimation for Digital Instrument/Control System

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Yaguang; Sydnor, Russell [U.S. Nuclear Regulatory Commission, Washington, D.C. (United States)

    2011-08-15

    Digital instrumentation and controls (DI and C) systems are widely adopted in various industries because of their flexibility and ability to implement various functions that can be used to automatically monitor, analyze, and control complicated systems. It is anticipated that the DI and C will replace the traditional analog instrumentation and controls (AI and C) systems in all future nuclear reactor designs. There is an increasing interest for reliability and risk analyses for safety critical DI and C systems in regulatory organizations, such as The United States Nuclear Regulatory Commission. Developing reliability models and reliability estimation methods for digital reactor control and protection systems will involve every part of the DI and C system, such as sensors, signal conditioning and processing components, transmission lines and digital communication systems, D/A and A/D converters, computer system, signal processing software, control and protection software, power supply system, and actuators. Some of these components are hardware, such as sensors and actuators, their failure mechanisms are well understood, and the traditional reliability model and estimation methods can be directly applied. But many of these components are firmware which has software embedded in the hardware, and software needs special consideration because its failure mechanism is unique, and the reliability estimation method for a software system will be different from the ones used for hardware systems. In this paper, we will propose a reliability estimation method for the entire DI and C system reliability using a recently developed software reliability estimation method and a traditional hardware reliability estimation method.

  3. Reliability Estimation for Digital Instrument/Control System

    International Nuclear Information System (INIS)

    Yang, Yaguang; Sydnor, Russell

    2011-01-01

    Digital instrumentation and controls (DI and C) systems are widely adopted in various industries because of their flexibility and ability to implement various functions that can be used to automatically monitor, analyze, and control complicated systems. It is anticipated that the DI and C will replace the traditional analog instrumentation and controls (AI and C) systems in all future nuclear reactor designs. There is an increasing interest for reliability and risk analyses for safety critical DI and C systems in regulatory organizations, such as The United States Nuclear Regulatory Commission. Developing reliability models and reliability estimation methods for digital reactor control and protection systems will involve every part of the DI and C system, such as sensors, signal conditioning and processing components, transmission lines and digital communication systems, D/A and A/D converters, computer system, signal processing software, control and protection software, power supply system, and actuators. Some of these components are hardware, such as sensors and actuators, their failure mechanisms are well understood, and the traditional reliability model and estimation methods can be directly applied. But many of these components are firmware which has software embedded in the hardware, and software needs special consideration because its failure mechanism is unique, and the reliability estimation method for a software system will be different from the ones used for hardware systems. In this paper, we will propose a reliability estimation method for the entire DI and C system reliability using a recently developed software reliability estimation method and a traditional hardware reliability estimation method

  4. Computer determination of event maps with application to auxiliary supply systems

    International Nuclear Information System (INIS)

    Wredenberg, L.; Billinton, R.

    1975-01-01

    A method of evaluating the reliability of sequential operations in systems containing standby and alternate supply facilities is presented. The method is based upon the use of a digital computer for automatic development of event maps. The technique is illustrated by application to a nuclear power plant auxiliary supply system. (author)

  5. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    OpenAIRE

    Mark Ndubuka NWOHU

    2007-01-01

    The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. ...

  6. Dimensioning aspects of 48 V telecommunications power supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Jakab, L. [Siemens Telefongyar Kft (Hungary)

    2000-07-01

    Considering the reliable operation of the 48 V telecommunications power supply systems it is essential the appropriate dimensioning. The basic elements of the power supply systems, i.e. batteries, rectifiers, DC/AC cabling, fuses, etc., should be defined by exact calculation. The presentation reviews the main questions and problems of dimensioning. It lays a special emphasis on the optimized planning procedure, further it also deals with the economical impacts of the dimensioning parameters. (orig.)

  7. Electrical system design and reliability at Ontario Hydro nuclear generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Royce, C. J. [Ontario Hydro, 700 University Avenue, Toronto, Ontario M5G 1X6 (Canada)

    1986-02-15

    This paper provides an overview of design practice and the predicted and actual reliability of electrical station service Systems at Ontario Nuclear Generating Stations. Operational experience and licensing changes have indicated the desirability of improving reliability in certain instances. For example, the requirement to start large emergency coolant injection pumps resulted in the turbine generator units in a multi-unit station being used as a back-up power supply. Results of reliability analyses are discussed. To mitigate the effects of common mode events Ontario Hydro adopted a 'two group' approach to the design of safety related Systems. This 'two group' approach is reviewed and a single fully environmentally qualified standby power supply is proposed for future use. (author)

  8. Lean and reliable digital supply chains - case study

    Directory of Open Access Journals (Sweden)

    Marcin Hajdul

    2015-03-01

    Full Text Available Background: Existing business model supply chains organisation results in inefficient use of transport resources, high transport costs, increasing congestions and CO2 emission. This effect has been demonstrated by research conducted by the author as well as by the European Environmental Agency. To change this situation companies are in need of affordable, realisable and trusted data-interchange solutions to take part in international trade and commerce flows. The aim of this paper is to present practical implementation of the developed by the authors concept of global freight management ecosystem and its practical implementation using T-Traco platform. Methods: Survey, desk research and real case study results were used in the paper. Reults and conclusions: Real time and global data exchange within the whole supply (including modes of transport and transport units chain is a backbone of the lean and reliable digital supply chain.

  9. Effect of dc-power-system reliability on reactor-shutdown cooling

    International Nuclear Information System (INIS)

    Kolaczkowski, A.M.; Baranowsky, P.W.; Hickman, J.W.

    1981-01-01

    The DC power systems in a nuclear power plant provide control and motive power to valves, instrumentation, emergency diesel generators, and many other components and systems during all phases of plant operation including abnormal shutdowns and accident situations. A specific area of concern is the adequacy of the minimum design requirements for DC power systems, particularly with regard to multiple and common cause failures. This concern relates to the application of the single failure criterion for assuring a reliable DC power supply which may be required for the functionability of shutdown cooling systems. The results are presented of a reliability based study performed to assess the adequacy of DC power supply design requirements for currently operating light water reactors with particular attention to shutdown cooling requirements

  10. Improvement of standards on functional reliability of electric power systems

    International Nuclear Information System (INIS)

    Barinov, V.A.; Volkov, G.A.; Kalita, V.V.; Kogan, F.L.; Makarov, S.F.; Manevich, A.S.; Mogirev, V.V.; Sin'chugov, F.I.; Skopintsev, V.A.; Khvoshchinskaya, Z.G.

    1993-01-01

    Analysis of the most principal aspects of the existing standards and requirements on assuring safety and stability of electric power systems (EPS) and effective (reliable and economical) power supply of consumers is given. The reliability is determined as ability to accomplish the assigned functions. Basic recommendations on improving the standards regulating the safety and reliability of the NPP functioning are formulated

  11. Computer Model to Estimate Reliability Engineering for Air Conditioning Systems

    International Nuclear Information System (INIS)

    Afrah Al-Bossly, A.; El-Berry, A.; El-Berry, A.

    2012-01-01

    Reliability engineering is used to predict the performance and optimize design and maintenance of air conditioning systems. Air conditioning systems are expose to a number of failures. The failures of an air conditioner such as turn on, loss of air conditioner cooling capacity, reduced air conditioning output temperatures, loss of cool air supply and loss of air flow entirely can be due to a variety of problems with one or more components of an air conditioner or air conditioning system. Forecasting for system failure rates are very important for maintenance. This paper focused on the reliability of the air conditioning systems. Statistical distributions that were commonly applied in reliability settings: the standard (2 parameter) Weibull and Gamma distributions. After distributions parameters had been estimated, reliability estimations and predictions were used for evaluations. To evaluate good operating condition in a building, the reliability of the air conditioning system that supplies conditioned air to the several The company's departments. This air conditioning system is divided into two, namely the main chilled water system and the ten air handling systems that serves the ten departments. In a chilled-water system the air conditioner cools water down to 40-45 degree F (4-7 degree C). The chilled water is distributed throughout the building in a piping system and connected to air condition cooling units wherever needed. Data analysis has been done with support a computer aided reliability software, this is due to the Weibull and Gamma distributions indicated that the reliability for the systems equal to 86.012% and 77.7% respectively. A comparison between the two important families of distribution functions, namely, the Weibull and Gamma families was studied. It was found that Weibull method performed for decision making.

  12. Investigation of thermochemical biorefinery sizing and environmental sustainability impacts for conventional supply system and distributed preprocessing supply system designs

    Energy Technology Data Exchange (ETDEWEB)

    Muth, jr., David J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Langholtz, Matthew H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Tan, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jacobson, Jacob [Idaho National Lab. (INL), Idaho Falls, ID (United States); Schwab, Amy [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wu, May [Argonne National Lab. (ANL), Argonne, IL (United States); Argo, Andrew [Sundrop Fuels, Golden, CO (United States); Brandt, Craig C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cafferty, Kara [Idaho National Lab. (INL), Idaho Falls, ID (United States); Chiu, Yi-Wen [Argonne National Lab. (ANL), Argonne, IL (United States); Dutta, Abhijit [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eaton, Laurence M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Searcy, Erin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-03-31

    The 2011 US Billion-Ton Update estimates that by 2030 there will be enough agricultural and forest resources to sustainably provide at least one billion dry tons of biomass annually, enough to displace approximately 30% of the country's current petroleum consumption. A portion of these resources are inaccessible at current cost targets with conventional feedstock supply systems because of their remoteness or low yields. Reliable analyses and projections of US biofuels production depend on assumptions about the supply system and biorefinery capacity, which, in turn, depend upon economic value, feedstock logistics, and sustainability. A cross-functional team has examined combinations of advances in feedstock supply systems and biorefinery capacities with rigorous design information, improved crop yield and agronomic practices, and improved estimates of sustainable biomass availability. A previous report on biochemical refinery capacity noted that under advanced feedstock logistic supply systems that include depots and pre-processing operations there are cost advantages that support larger biorefineries up to 10 000 DMT/day facilities compared to the smaller 2000 DMT/day facilities. This report focuses on analyzing conventional versus advanced depot biomass supply systems for a thermochemical conversion and refinery sizing based on woody biomass. The results of this analysis demonstrate that the economies of scale enabled by advanced logistics offsets much of the added logistics costs from additional depot processing and transportation, resulting in a small overall increase to the minimum ethanol selling price compared to the conventional logistic supply system. While the overall costs do increase slightly for the advanced logistic supply systems, the ability to mitigate moisture and ash in the system will improve the storage and conversion processes. In addition, being able to draw on feedstocks from further distances will decrease the risk of biomass supply to

  13. Reliability analyses of safety systems for WWER-440 nuclear power plants

    International Nuclear Information System (INIS)

    Dusek, J.; Hojny, V.

    1985-01-01

    The UJV in Rez near Prague studied the reliability of the system of emergency core cooling and of the system for suppressing pressure in the sealed area of the nuclear power plant in the occurrence of a loss-of-coolant accident. The reliability of the systems was evaluated by failure tree analysis. Simulation and analytical calculation programs were developed and used for the reliability analysis. The results are briefly presented of the reliability analyses of the passive system for the immediate short-term flooding of the reactor core, of the active low-pressure system of emergency core cooling, the spray system, the bubble-vacuum system and the system of emergency supply of the steam generators. (E.S.)

  14. Reliability of supply of switchgear for auxiliary low voltage in substations extra high voltage to high voltage

    Directory of Open Access Journals (Sweden)

    Perić Dragoslav M.

    2015-01-01

    Full Text Available Switchgear for auxiliary low voltage in substations (SS of extra high voltages (EHV to high voltage (HV - SS EHV/HV kV/kV is of special interest for the functioning of these important SS, as it provides a supply for system of protection and other vital functions of SS. The article addresses several characteristic examples involving MV lines with varying degrees of independence of their supply, and the possible application of direct transformation EHV/LV through special voltage transformers. Auxiliary sources such as inverters and diesel generators, which have limited power and expensive energy, are also used for the supply of switchgear for auxiliary low voltage. Corresponding reliability indices are calculated for all examples including mean expected annual engagement of diesel generators. The applicability of certain solutions of switchgear for auxiliary low voltage SS EHV/HV, taking into account their reliability, feasibility and cost-effectiveness is analyzed too. In particular, the analysis of applications of direct transformation EHV/LV for supply of switchgear for auxiliary low voltage, for both new and existing SS EHV/HV.

  15. French power system reliability report 2008

    International Nuclear Information System (INIS)

    Tesseron, J.M.

    2009-06-01

    The reliability of the French power system was fully under control in 2008, despite the power outage in the eastern part of the Provence-Alpes-Cote d'Azur region on November 3, which had been dreaded for several years, since it had not been possible to set up a structurally adequate network. Pursuant to a consultation meeting, the reinforcement solution proposed by RTE was approved by the Minister of Energy, boding well for greater reliability in future. Based on the observations presented in this 2008 Report, RTE's Power System Reliability Audit Mission considers that no new recommendations are needed beyond those expressed in previous reliability reports and during reliability audits. The publication of this yearly report is in keeping with RTE's goal to promote the follow-up over time of the evolution of reliability in its various aspects. RTE thus aims to contribute to the development of reliability culture, by encouraging an improved assessment by the different players (both RTE and network users) of the role they play in building reliability, and by advocating the taking into account of reliability and benchmarking in the European organisations of Transmission System Operators. Contents: 1 - Brief overview of the evolution of the internal and external environment; 2 - Operating situations encountered: climatic conditions, supply / demand balance management, operation of interconnections, management of internal congestion, contingencies affecting the transmission facilities; 3 - Evolution of the reliability reference guide: external reference guide: directives, laws, decrees, etc, ETSO, UCTE, ENTSO-E, contracting contributing to reliability, RTE internal reference guide; 4 - Evolution of measures contributing to reliability in the equipment field: intrinsic performances of components (generating sets, protection systems, operation PLC's, instrumentation and control, automatic frequency and voltage controls, transmission facilities, control systems, load

  16. Design of EAST LHCD high power supply feedback control system based on PLC

    International Nuclear Information System (INIS)

    Hu Huaichuan; Shan Jiafang

    2009-01-01

    Design of EAST LHCD -35kV/5.6MW high power supply feedback control system based on PLC is described. Industrial computer and PLC are used to control high power supply in the system. PID arithmetic is adopted to achieve the feedback control of voltage of high power supply. Operating system is base on real-time operating system of QNX. Good controlling properties and reliable protective properties of the feedback control system are proved by the experiment results. (authors)

  17. Reliability analysis with the simulator S.ESCAF of a very complex sequential system: the electrical power supply system of a nuclear reactor

    International Nuclear Information System (INIS)

    Blot, M.

    1987-06-01

    The reliability analysis of complex sequential systems, in which the order of arrival of the events must be taken into account, can be very difficult, because the use of the classical modelling technique of Markov diagrams leads to an important limitation on the number of components which can be handled. The desk-top apparatus S.ESCAF, which electronically simulates very closely the behaviour of the system being studied, and is very easy to use, even by a non specialist in electronics, allows one to avoid these inconveniences and to enlarge considerably the analysis possibilities. This paper shows the application of the S.ESCAF method to the electrical power supply system of a nuclear reactor. This system requires the simulation of more than forty components with about sixty events such as failure, repair and refusal to start. A comparison of times necessary to perform the analysis by these means and by other methods is described, and the advantages of S.ESCAF are presented

  18. Investigation of thermochemical biorefinery sizing and environmental sustainability impacts for conventional supply system and distributed pre-processing supply system designs

    Energy Technology Data Exchange (ETDEWEB)

    David J. Muth, Jr.; Matthew H. Langholtz; Eric C. D. Tan; Jacob J. Jacobson; Amy Schwab; May M. Wu; Andrew Argo; Craig C. Brandt; Kara G. Cafferty; Yi-Wen Chiu; Abhijit Dutta; Laurence M. Eaton; Erin M. Searcy

    2014-08-01

    The 2011 US Billion-Ton Update estimates that by 2030 there will be enough agricultural and forest resources to sustainably provide at least one billion dry tons of biomass annually, enough to displace approximately 30% of the country's current petroleum consumption. A portion of these resources are inaccessible at current cost targets with conventional feedstock supply systems because of their remoteness or low yields. Reliable analyses and projections of US biofuels production depend on assumptions about the supply system and biorefinery capacity, which, in turn, depend upon economic value, feedstock logistics, and sustainability. A cross-functional team has examined combinations of advances in feedstock supply systems and biorefinery capacities with rigorous design information, improved crop yield and agronomic practices, and improved estimates of sustainable biomass availability. A previous report on biochemical refinery capacity noted that under advanced feedstock logistic supply systems that include depots and pre-processing operations there are cost advantages that support larger biorefineries up to 10 000 DMT/day facilities compared to the smaller 2000 DMT/day facilities. This report focuses on analyzing conventional versus advanced depot biomass supply systems for a thermochemical conversion and refinery sizing based on woody biomass. The results of this analysis demonstrate that the economies of scale enabled by advanced logistics offsets much of the added logistics costs from additional depot processing and transportation, resulting in a small overall increase to the minimum ethanol selling price compared to the conventional logistic supply system. While the overall costs do increase slightly for the advanced logistic supply systems, the ability to mitigate moisture and ash in the system will improve the storage and conversion processes. In addition, being able to draw on feedstocks from further distances will decrease the risk of biomass supply to

  19. An introduction to system reliability for solid-state lighting

    NARCIS (Netherlands)

    Driel, W.D. van; Evertz, F.E.; Zaal, J.J.M.; Morales Nápoles, O.; Yuan, C.A.

    2013-01-01

    Solid-State Lighting (SSL) applications are slowly but gradually pervading into our daily life. An SSL system is composed of an light-emitting diode (LED) engine with a microelectronic driver(s) in a housing that also supplies the optic design. Knowledge of system-level reliability is crucial for

  20. Assessing rural small community water supply in Limpopo, South Africa: water service benchmarks and reliability.

    Science.gov (United States)

    Majuru, Batsirai; Jagals, Paul; Hunter, Paul R

    2012-10-01

    Although a number of studies have reported on water supply improvements, few have simultaneously taken into account the reliability of the water services. The study aimed to assess whether upgrading water supply systems in small rural communities improved access, availability and potability of water by assessing the water services against selected benchmarks from the World Health Organisation and South African Department of Water Affairs, and to determine the impact of unreliability on the services. These benchmarks were applied in three rural communities in Limpopo, South Africa where rudimentary water supply services were being upgraded to basic services. Data were collected through structured interviews, observations and measurement, and multi-level linear regression models were used to assess the impact of water service upgrades on key outcome measures of distance to source, daily per capita water quantity and Escherichia coli count. When the basic system was operational, 72% of households met the minimum benchmarks for distance and water quantity, but only 8% met both enhanced benchmarks. During non-operational periods of the basic service, daily per capita water consumption decreased by 5.19l (pwater sources were 639 m further (p ≤ 0.001, 95% CI 560-718). Although both rudimentary and basic systems delivered water that met potability criteria at the sources, the quality of stored water sampled in the home was still unacceptable throughout the various service levels. These results show that basic water services can make substantial improvements to water access, availability, potability, but only if such services are reliable. Copyright © 2012 Elsevier B.V. All rights reserved.

  1. The role of PV electricity generation in fully renewable energy supply systems

    International Nuclear Information System (INIS)

    Lehmann, H.; Peter, S.

    2004-01-01

    A sustainable energy supply will be based on renewable energies and it must use available resources efficiently. Earlier or later the energy supply will rely completely on renewable sources. A solar energy system that provides a reliable energy supply throughout the year includes the consistent use of local renewable energy sources (e.g. PV) wherever possible. Using Japan as a example it was shown that the vision of a full renewable energy supply, even with high shares of domestic sources is possible. Detailed simulations of such a system show that the PV systems play an important role delivering electricity at peak demand times. (authors)

  2. Apples to Apples: Equivalent-Reliability Power Systems Across Diverse Resource Mix Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Stephen, Gordon W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Frew, Bethany A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Sigler, Devon [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jones, Wesley B [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-28

    Electricity market research is highly price sensitive, and prices are strongly influenced by balance of supply and demand. This work looks at how to combine capacity expansion models and reliability assessment tools to assess equivalent-reliability power systems across diverse resource mix scenarios.

  3. Impact of Operating Rules on Planning Capacity Expansion of Urban Water Supply Systems

    Science.gov (United States)

    de Neufville, R.; Galelli, S.; Tian, X.

    2017-12-01

    This study addresses the impact of operating rules on capacity planning of urban water supply systems. The continuous growth of metropolitan areas represents a major challenge for water utilities, which often rely on industrial water supply (e.g., desalination, reclaimed water) to complement natural resources (e.g., reservoirs). These additional sources increase the reliability of supply, equipping operators with additional means to hedge against droughts. How do their rules for using industrial water supply impact the performance of water supply system? How might it affect long-term plans for capacity expansion? Possibly significantly, as demonstrated by the analysis of the operations and planning of a water supply system inspired by Singapore. Our analysis explores the system dynamics under multiple inflow and management scenarios to understand the extent to which alternative operating rules for the use of industrial water supply affect system performance. Results first show that these operating rules can have significant impact on the variability in system performance (e.g., reliability, energy use) comparable to that of hydro-climatological conditions. Further analyses of several capacity expansion exercises—based on our original hydrological and management scenarios—show that operating rules significantly affect the timing and magnitude of critical decisions, such as the construction of new desalination plants. These results have two implications: Capacity expansion analysis should consider the effect of a priori uncertainty about operating rules; and operators should consider how their flexibility in operating rules can affect their perceived need for capacity.

  4. High reliability flow system - an assessment of pump reliability and optimisation of the number of pumps

    International Nuclear Information System (INIS)

    Butterfield, J.M.

    1981-01-01

    A system is considered where a number of pumps operate in parallel. Normally, all pumps operate, driven by main motors fed from the grid. Each pump has a pony motor fed from an individual battery supply. Each pony motor is normally running, but not engaged to the pump shaft. On demand, e.g. failure of grid supplies, each pony motor is designed to clutch-in automatically when the pump speed falls to a specified value. The probability of all the pony motors failing to clutch-in on demand must be demonstrated with 95% confidence to be less than 10 -8 per demand. This assessment considers how the required reliability of pony motor drives might be demonstrated in practice and the implications on choice of the number of pumps at the design stage. The assessment recognises that not only must the system prove to be extremely reliable, but that demonstration that reliability is adequate must be done during plant commissioning, with practical limits on the amount of testing performed. It is concluded that a minimum of eight pony motors should be provided, eight pumps each with one pony motor (preferred) or five pumps each with two independent pony motors. A minimum of two diverse pony motor systems should be provided. (author)

  5. Start-up neutral-beam power supply system for MFTF

    International Nuclear Information System (INIS)

    Mooney, L.J.

    1979-01-01

    This paper describes some of the design features and considerations of the MFTF start-up neutral-beam power supplies. In particular, we emphasize features of the system that will ensure MFTF compatibility and achieve the required reliability/availability for the MFTF to be successful

  6. Availability of nuclear fuels: one aspect of the reliability of supply. [German Federal Republic

    Energy Technology Data Exchange (ETDEWEB)

    Dolinski, U; Ziesing, H J [Deutsches Inst. fuer Wirtschaftsforschung, Berlin (F.R. Germany)

    1976-09-01

    In connection with the future supply of nuclear fuels to the Federal Republic of Germany the authors discuss the problems which arise. They describe the future development of the demand for natural uranium and the work involved in separation and deal with the possibilities of meeting the demand. They pay particular attention to the changed market situation and to the policies of the countries which produce uranium. The article is a detailed examination of the report by the German Institute for Economic Research (DIW) on aspects of the reliability of supply to the electricity supply industry in the Federal Republic of Germany, which was prepared under the aegis of the Bavarian Ministry for Economic and Transport. This investigation will be published, omitting the regional aspects, towards the middle of 1976, by the German Institute for Economic Research under the title 'Reliability, price and environmental protection aspects of energy supply'.

  7. Extension planning for electrical energy supply systems

    International Nuclear Information System (INIS)

    Bieselt, R.

    1975-01-01

    In the future as well as in the past, and in particular in the next decade a considerable increase in electrical energy demand can be expected. To satisfy this demand in a reliable and sufficient manner will force the utilities to invest large sums of money for the operation and the extension of power generation and distribution plants. The size of these investments justifies the search for more and more comprehensive and at the same time more detailed planning methods. With the help of system analysis a planning model for the electricity supply industry of a major supply area will be designed. (orig./RW) [de

  8. Passive system with steam-water injector for emergency supply of NPP steam generators

    International Nuclear Information System (INIS)

    Il'chenko, A.G.; Strakhov, A.N.; Magnitskij, D.N.

    2009-01-01

    The calculation results of reliability indicators of emergency power supply system and emergency feed-water supply system of serial WWER-1000 unit are presented. To ensure safe water supply to steam generators during station blackout it was suggested using additional passive emergency feed-water system with a steam-water injector working on steam generators dump steam. Calculated analysis of steam-water injector operating capacity was conducted at variable parameters of steam at the entrance to injector, corresponding to various moments of time from the beginning of steam-and-water damping [ru

  9. Analysis of the Possible Use of Solar Photovoltaic Energy in Urban Water Supply Systems

    Directory of Open Access Journals (Sweden)

    Bojan Đurin

    2014-05-01

    Full Text Available Because of the importance of water supply for the sustainability of urban areas, and due to the significant consumption of energy with prices increasing every day, an alternative solution for sustainable energy supply should be sought in the field of Renewable Energy Sources (RES. An innovative solution as presented in this paper has until now not been comprehensively analyzed. This work presents the solution with the application of a (Photovoltaic PV generator. The main technological features, in addition to the designing methodology and case study are presented in this paper. The critical period approach has been used for the first time for system sizing. The application of this sizing method provides a high reliability of the proposed system. The obtained results confirm the assumption that the PV generator is a promising energy sustainable solution for urban water supply systems. The service reservoir, which acts as water and energy storage for the proposed system, provides the basis for a sustainable solution of water and energy supply. In accordance with the proposed, the reliability of such system is high. This concept of energy supply operation does not generate any atmospheric emission of greenhouse gases, which contributes significantly to the reduction of the impacts of climate changes. The proposed solution and designing methodology are widely applicable and in accordance with the characteristics of the water supply system and climate.

  10. Study of selected problems of reliability of the supply chain in the trading company

    Directory of Open Access Journals (Sweden)

    2010-06-01

    Full Text Available The paper presents the problems of the reliability of the supply chain as a whole in the dependence on the reliability of its elements. Different variants of reserving of canals (prime and reserve ones and issues connected with their switching are discussed.

  11. Realization of toroidal field power supply control system for J-TEXT tokamak

    International Nuclear Information System (INIS)

    Qiu Shengshun; Zhuang Ge; Zhang Ming; Feng Jianming

    2009-01-01

    Based on the integrated development environment provided by QNX real-time operation system, the control system of toroidal field power supply is designed and developed. The system is proved to be reliable, stable and in real-time. It can control the power supply successfully to produce a constant current up to 92.5kA lasting for 1s and 1.74T at the magnetic axis. In conclusion, the control system can meet the requirements of the J-TEXT routine operation at present. (authors)

  12. Reliability criteria selection for integrated resource planning

    International Nuclear Information System (INIS)

    Ruiu, D.; Ye, C.; Billinton, R.; Lakhanpal, D.

    1993-01-01

    A study was conducted on the selection of a generating system reliability criterion that ensures a reasonable continuity of supply while minimizing the total costs to utility customers. The study was conducted using the Institute for Electronic and Electrical Engineers (IEEE) reliability test system as the study system. The study inputs and results for conditions and load forecast data, new supply resources data, demand-side management resource data, resource planning criterion, criterion value selection, supply side development, integrated resource development, and best criterion values, are tabulated and discussed. Preliminary conclusions are drawn as follows. In the case of integrated resource planning, the selection of the best value for a given type of reliability criterion can be done using methods similar to those used for supply side planning. The reliability criteria values previously used for supply side planning may not be economically justified when integrated resource planning is used. Utilities may have to revise and adopt new, and perhaps lower supply reliability criteria for integrated resource planning. More complex reliability criteria, such as energy related indices, which take into account the magnitude, frequency and duration of the expected interruptions are better adapted than the simpler capacity-based reliability criteria such as loss of load expectation. 7 refs., 5 figs., 10 tabs

  13. Systems reliability/structural reliability

    International Nuclear Information System (INIS)

    Green, A.E.

    1980-01-01

    The question of reliability technology using quantified techniques is considered for systems and structures. Systems reliability analysis has progressed to a viable and proven methodology whereas this has yet to be fully achieved for large scale structures. Structural loading variants over the half-time of the plant are considered to be more difficult to analyse than for systems, even though a relatively crude model may be a necessary starting point. Various reliability characteristics and environmental conditions are considered which enter this problem. The rare event situation is briefly mentioned together with aspects of proof testing and normal and upset loading conditions. (orig.)

  14. Ultracapacitor-Based Uninterrupted Power Supply System

    Science.gov (United States)

    Eichenberg, Dennis J.

    2011-01-01

    The ultracapacitor-based uninterrupted power supply (UPS) system enhances system reliability; reduces life-of-system, maintenance, and downtime costs; and greatly reduces environmental impact when compared to conventional UPS energy storage systems. This design provides power when required and absorbs power when required to smooth the system load and also has excellent low-temperature performance. The UPS used during hardware tests at Glenn is an efficient, compact, maintenance-free, rack-mount, pure sine-wave inverter unit. The UPS provides a continuous output power up to 1,700 W with a surge rating of 1,870 W for up to one minute at a nominal output voltage of 115 VAC. The ultracapacitor energy storage system tested in conjunction with the UPS is rated at 5.8 F. This is a bank of ten symmetric ultracapacitor modules. Each module is actively balanced using a linear voltage balancing technique in which the cell-to-cell leakage is dependent upon the imbalance of the individual cells. The ultracapacitors are charged by a DC power supply, which can provide up to 300 VDC at 4 A. A constant-voltage, constant-current power supply was selected for this application. The long life of ultracapacitors greatly enhances system reliability, which is significant in critical applications such as medical power systems and space power systems. The energy storage system can usually last longer than the application, given its 20-year life span. This means that the ultracapacitors will probably never need to be replaced and disposed of, whereas batteries require frequent replacement and disposal. The charge-discharge efficiency of rechargeable batteries is approximately 50 percent, and after some hundreds of charges and discharges, they must be replaced. The charge-discharge efficiency of ultracapacitors exceeds 90 percent, and can accept more than a million charges and discharges. Thus, there is a significant energy savings through the efficiency improvement, and there is far less

  15. Reliability estimation for multiunit nuclear and fossil-fired industrial energy systems

    International Nuclear Information System (INIS)

    Sullivan, W.G.; Wilson, J.V.; Klepper, O.H.

    1977-01-01

    As petroleum-based fuels grow increasingly scarce and costly, nuclear energy may become an important alternative source of industrial energy. Initial applications would most likely include a mix of fossil-fired and nuclear sources of process energy. A means for determining the overall reliability of these mixed systems is a fundamental aspect of demonstrating their feasibility to potential industrial users. Reliability data from nuclear and fossil-fired plants are presented, and several methods of applying these data for calculating the reliability of reasonably complex industrial energy supply systems are given. Reliability estimates made under a number of simplifying assumptions indicate that multiple nuclear units or a combination of nuclear and fossil-fired plants could provide adequate reliability to meet industrial requirements for continuity of service

  16. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.A.; MI, J.; OERTER, B.; SANDERS, R.; SANDBERG, J.

    2001-01-01

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beam dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful

  17. High voltage pulse system for the streamer chamber supply of the GIBS spectrometer

    International Nuclear Information System (INIS)

    Aksinenko, V.D.; Glagoleva, N.S.; Dement'ev, E.A.; Kaminskij, N.I.; Matyushin, A.T.; Matyushin, V.T.; Rozhnyatovskaya, S.A.; Ryakhovskij, V.N.; Nurgozhin, N.N.; Khusainov, E.K.

    1987-01-01

    Results of development and testing of high voltage pulse system HVPS for the streamer chamber supply of the GIBS spectrometer are presented. HVPS consists of the following basic blocks: nanosecond pulse high voltage generator, high voltage charging supply, trigger generator, chamber parameter control devices, gas-oil vacuuming supply systems, auxiliary and fire-prevention devices. The system blocks are described. Experimental results of HVPC testing are presented. HVPC provides a reliable (10 5 operations) of streamer chamber supply with high voltage pulse parameters: amplitude - 500 kV, amplitude instability (0.5-1.5)%, pulse duration - 12 ns, delay time - 500 ns, delay instability (2.5-5)%, mean frequency of output a signals - 0.1 Hz

  18. A design of electric power supply system for gamma irradiator ISG-500

    International Nuclear Information System (INIS)

    Harno Garnito; Enggar; Harjani; Ari Satmoko; Sutomo Budihaharjo

    2010-01-01

    Reliability of electrical power system in Irradiator system is absolutely necessary during the life cycle. Electrical energy is used as the main supporting element for both Irradiator operation of mechanical system, lighting, as well as for instrumentation and control systems. The reliability of electrical power system in the system can be achieved by paying attention Irradiator safety, simplicity of operation, ease of maintenance and possible future development. Distribution network of the most commonly used is the Radial network system, for the simple and in accordance with the criteria demanded by a distribution system. In addition to the network system, to get the reliability of electric power supply system is the selection of equipment/materials that meet the standards, and the installation of which provide facilities for maintenance and repairs. (author)

  19. Smart Power Supply Systems for Mission Critical Facilities

    Science.gov (United States)

    Hirose, Keiichi; Babasaki, Tadatoshi

    To develop the advanced and rich life, and the also economy and social activity continuously, various types of energy are necessary. At the same time, to protect the global environment and to prevent the depletion of natural resources, the effective and moreover efficient use of energy is becoming important. Electric power is one of the most important forms of energy for our life and society. This paper describes topics and survey results of technical trends regarding the electric power supply systems which are playing a core role as the important infrastructure to support the emergence of information-oriented society. Specifically, the power supply systems that enhance high power quality and reliability (PQR) are important for the steady growth of information and communication services. The direct current (DC) power, which has been used for telecommunications power systems and information and communications technologies (ICT), enables existing utilities' grid and distributed energy resources to keep a balance between supply and demand of small-scaled power systems or microgirds. These techniques are expected to be part of smartgrid technologies and facilitate the installation of distributed generators in mission critical facilities.

  20. Reliability assessment of emergency exhaust system in a pool-type research reactor

    International Nuclear Information System (INIS)

    Khan, S.A.

    1991-01-01

    The reliability of an extract system in a swimming-pool-type research reactor has been assessed. A global fault-tree analysis technique has been utilized. The basic event reliability data is based on both generic and reactor specific informations. The unavailability of the extract system is quantified in terms of the unavailability of the various functional requirements of the system. The unavailability is expressed as the probability of failure on demand. The computer system unavailability is determined from the minimal cutsets of the system. It is found that only three events have a major contribution to the top event, i.e., failures of compressed air supply, electric power supply and solenoid valve. A sensitivity analysis is performed to show the effects of variations in the data values of the dominant cutsets. An uncertainty analysis was also performend on the fault tree. The evaluations show that the reactor extract system lacks diversity and redundance in most of its components. It is tolerant of most minor degradations, as these are taken care of by the operating policies and procedures. However, it can not tolerate common cause failures, e.g. simultaneous compressed air and electric power supply failure. Based upon the results obtained, some recommendations are made. (orig.)

  1. Reliable computer systems.

    Science.gov (United States)

    Wear, L L; Pinkert, J R

    1993-11-01

    In this article, we looked at some decisions that apply to the design of reliable computer systems. We began with a discussion of several terms such as testability, then described some systems that call for highly reliable hardware and software. The article concluded with a discussion of methods that can be used to achieve higher reliability in computer systems. Reliability and fault tolerance in computers probably will continue to grow in importance. As more and more systems are computerized, people will want assurances about the reliability of these systems, and their ability to work properly even when sub-systems fail.

  2. Energy supplies in the Federal Republic of Germany. The reliability of supplies and strategies to provide for it. Die Energieversorgung der Bundesrepublik. Sicherungsbedarf und Sicherungsstrategien

    Energy Technology Data Exchange (ETDEWEB)

    Matthies, K

    1985-06-01

    The IEA crisis management has so far not been required to demonstrate its full capacity and power. In spite of a number of crises in the Middle East oil has always been sufficiently available in the Western world. Even with the Gulf at war there have been abundant oil supplies and once again slackening petroleum prices on the world market for several years. This very situation did not fail to affect the different opinions on the reliability of supplies. While the Western German petroleum industry is being suffocated by accumulating idle refinery stocks and therefore protests against excessive provision making with the help of restrictive policies, the mining industry still meets with political support for a policy of stockpiling for the sake of reliable energy supplies. In view of the inflationary use of the reliability and safety concepts in political discussion the publication abstracted is trying to throw light on the meaning per se, the development of the supply situation in the Federal Republic of Germany since 1973 and on the applicability and costs of possible precautionary strategies taking effect in the case of suspended energy imports.

  3. Reliability analysis for the facility data acquisition interface system upgrade at TA-55

    International Nuclear Information System (INIS)

    Turner, W.J.; Pope, N.G.; Brown, R.E.

    1995-05-01

    Because replacement parts for the existing facility data acquisition interface system at TA-55 have become scarce and are no longer being manufactured, reliability studies were conducted to assess various possible replacement systems. A new control system, based on Allen-Bradley Programmable Logic Controllers (PLCs), was found to have a likely reliability 10 times that of the present system, if the existing Continuous Air Monitors (CAMS) were used. Replacement of the old CAMs with new CAMs will result in even greater reliability as these are gradually phased in. The new PLC-based system would provide for hot standby processors, redundant communications paths, and redundant power supplies, and would be expandable and easily maintained, as well as much more reliable. TA-55 is the Plutonium Processing Facility which processes and recovers Pu-239 from scrap materials

  4. Coordination in the Decentralized Assembly System with Dual Supply Modes

    Directory of Open Access Journals (Sweden)

    Xu Guan

    2013-01-01

    Full Text Available This paper investigates a decentralized assembly system that consists of one assembler and two independent suppliers; wherein one supplier is perfectly reliable for the production, while the other generates yield uncertainty. Facing the random market demand, the assembler has to order the components from one supplier in advance and meanwhile requires the other supplier to deliver the components under VMI mode. We construct a Nash game between the supplier and the assembler so as to derive their equilibrium procurement/production strategies. The results show that the channel’s performance is highly undermined by the decentralization between players and also the combination of two supply modes. Compared to the centralized system, we propose an advance payment contract to perfectly coordinate the supply chain performance. The numerical examples indicate some management implications on the supply mode comparison and sensitivity analysis.

  5. Numerical study on oil supply system of a rotary compressor

    International Nuclear Information System (INIS)

    Wu, Jianhua; Wang, Gang

    2013-01-01

    The oil supply system is a crucial reliability issue for rotary compressors. This paper provides a general method for analyzing the oil supply system of a rotary compressor by using computational fluid dynamics (CFD). The process includes establishing the physical model, dividing computational grid, setting boundary conditions, calculating leakage rates through the roller end clearances, translating the dynamic issue into the static issue and so on. Validation of the rationality of the oil supply system model has been made by the measurement of the main bearing oil flow rates. The effects of operating conditions of the compressor, the oil level height of the oil sump and the main design parameters of the oil supply system on the oil supply characteristics are analyzed by numerical simulation. It is found that the main bearing oil flow rate varies circularly along with the rotation of the shaft. The shape and inclination angle of the spiral groove also influence the main bearing oil flow rate. The oil leakage rates through the roller end clearances depend largely on the operating conditions. In addition, the oil level height of the oil sump has a huge effect on the total oil flow rate. -- Highlights: • A CFD method for analyzing the oil supply system of rotary compressor is presented. • Leakage through the roller end clearances depends on the operating condition. • Groove shape and inclination angle are the main design parameters of spiral grooves. • A parabolic interface of oil and gas can be formed in the gallery of the shaft. • Single-flow model and steady solver can be applied to the oil supply system

  6. System for the reliability analysis of the electric energy supply; Sistema para el analisis de confiabilidad del suministro de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Perales, Favio; Martinez, Javier; Huesca, Francisco; Garcia, Norma; Nieva, Rolando [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    A computer tool, developed for the reliability evaluation of the electric energy supply, considering the faults in the generation and transmission systems, is presented. The application of the tool in planning the expansion and operation of the electric systems, the methodology of the solution employed and the various functions it accounts for, are described. At the end some illustrative examples of its applications by means of the studies with a model of representative characteristics of the interconnected national system. [Espanol] Se presenta una herramienta computacional desarrollada para evaluar la confiabilidad del suministro de energia electrica, considerando las fallas en los sistemas de generacion y transmision. Se describen las aplicaciones de la herramienta en la planeacion de la expansion y de la operacion de sistemas electricos, la metodologia de solucion empleada y las diversas funciones con que cuenta. Al final se presentan algunos ejemplos ilustrativos de sus aplicaciones mediante estudios con un modelo de caracteristicas representativas del sistema interconectado nacional.

  7. System for the reliability analysis of the electric energy supply; Sistema para el analisis de confiabilidad del suministro de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Perales, Favio; Martinez, Javier; Huesca, Francisco; Garcia, Norma; Nieva, Rolando [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    A computer tool, developed for the reliability evaluation of the electric energy supply, considering the faults in the generation and transmission systems, is presented. The application of the tool in planning the expansion and operation of the electric systems, the methodology of the solution employed and the various functions it accounts for, are described. At the end some illustrative examples of its applications by means of the studies with a model of representative characteristics of the interconnected national system. [Espanol] Se presenta una herramienta computacional desarrollada para evaluar la confiabilidad del suministro de energia electrica, considerando las fallas en los sistemas de generacion y transmision. Se describen las aplicaciones de la herramienta en la planeacion de la expansion y de la operacion de sistemas electricos, la metodologia de solucion empleada y las diversas funciones con que cuenta. Al final se presentan algunos ejemplos ilustrativos de sus aplicaciones mediante estudios con un modelo de caracteristicas representativas del sistema interconectado nacional.

  8. Power supply system on HT-7 tokamak for diagnostic neutral beam based on PLC

    International Nuclear Information System (INIS)

    Zhang Jian; Liu Baohua; Ding Tonghai; Du Shaowu

    2006-01-01

    A power supply system for diagnostic neutral beam on the HT-7 Tokamak was developed. Its logic control system based on S7-300 PLC was described. The experimental results show that the system is easy to operate and its performance is reliable. (authors)

  9. Reliability assessment of distribution power systems including distributed generations

    International Nuclear Information System (INIS)

    Megdiche, M.

    2004-12-01

    Nowadays, power systems have reached a good level of reliability. Nevertheless, considering the modifications induced by the connections of small independent producers to distribution networks, there's a need to assess the reliability of these new systems. Distribution networks present several functional characteristics, highlighted by the qualitative study of the failures, as dispersed loads at several places, variable topology and some electrotechnical phenomena which must be taken into account to model the events that can occur. The adopted reliability calculations method is Monte Carlo simulations, the probabilistic method most powerful and most flexible to model complex operating of the distribution system. We devoted a first part on the case of a 20 kV feeder to which a cogeneration unit is connected. The method was applied to a software of stochastic Petri nets simulations. Then a second part related to the study of a low voltage power system supplied by dispersed generations. Here, the complexity of the events required to code the method in an environment of programming allowing the use of power system calculations (load flow, short-circuit, load shedding, management of units powers) in order to analyse the system state for each new event. (author)

  10. Construction and qualification of the Power Supply system of the AMS-02 Tracker detector

    International Nuclear Information System (INIS)

    Menichelli, M.; Accardo, L.; Ambrosi, G.; Battiston, R.; Bizzarri, M.; Blasko, S.; Cosson, D.; Fiori, E.M.; Maris, O.; Papi, A.; Scolieri, G.

    2007-01-01

    The AMS-02 Tracker power supply system, described in this paper, has been designed optimizing noise performances, modularity and efficiency. The power is distributed starting from a 28V line coming from the power distribution system is converted into the needed voltages by means of DC-DC converters, and for bias supply and front-end voltages is post-regulated by means of linear regulators. Components Off The Shelf (COTS) have been extensively used in the construction of this power supply, however various radiation test campaigns have been performed in order to verify the reliability of these components. The power supply architecture developed for the tracker detector has been used as a guideline for the development of the power supplies for the other detectors in the experiment

  11. Smart Power Supply for Battery-Powered Systems

    Science.gov (United States)

    Krasowski, Michael J.; Greer, Lawrence; Prokop, Norman F.; Flatico, Joseph M.

    2010-01-01

    A power supply for battery-powered systems has been designed with an embedded controller that is capable of monitoring and maintaining batteries, charging hardware, while maintaining output power. The power supply is primarily designed for rovers and other remote science and engineering vehicles, but it can be used in any battery alone, or battery and charging source applications. The supply can function autonomously, or can be connected to a host processor through a serial communications link. It can be programmed a priori or on the fly to return current and voltage readings to a host. It has two output power busses: a constant 24-V direct current nominal bus, and a programmable bus for output from approximately 24 up to approximately 50 V. The programmable bus voltage level, and its output power limit, can be changed on the fly as well. The power supply also offers options to reduce the programmable bus to 24 V when the set power limit is reached, limiting output power in the case of a system fault detected in the system. The smart power supply is based on an embedded 8051-type single-chip microcontroller. This choice was made in that a credible progression to flight (radiation hard, high reliability) can be assumed as many 8051 processors or gate arrays capable of accepting 8051-type core presently exist and will continue to do so for some time. To solve the problem of centralized control, this innovation moves an embedded microcontroller to the power supply and assigns it the task of overseeing the operation and charging of the power supply assets. This embedded processor is connected to the application central processor via a serial data link such that the central processor can request updates of various parameters within the supply, such as battery current, bus voltage, remaining power in battery estimations, etc. This supply has a direct connection to the battery bus for common (quiescent) power application. Because components from multiple vendors may have

  12. MYRRHA cryogenic system study on performances and reliability requirements

    International Nuclear Information System (INIS)

    Junquera, T.; Chevalier, N.R.; Thermeau, J.P.; Medeiros Romao, L.; Vandeplassche, D.

    2015-01-01

    A precise evaluation of the cryogenic requirements for accelerator-driven system such as the MYRRHA project has been performed. In particular, operation temperature, thermal losses, and required cryogenic power have been evaluated. A preliminary architecture of the cryogenic system including all its major components, as well as the principles for the cryogenic fluids distribution has been proposed. A detailed study on the reliability aspects has also been initiated. This study is based on the reliability of large cryogenic systems used for accelerators like HERA, LHC or SNS Linac. The requirements to guarantee good cryogenic system availability can be summarised as follows: 1) Mean Time Between Maintenance (MTBM) should be > 8 000 hours; 2) Valves, heat exchangers and turbines are particularly sensitive elements to impurities (dust, oil, gases), improvements are necessary to keep a minimal level in these components; 3) Redundancy studies for all elements containing moving/vibrating parts (turbines, compressors, including their respective bearings and seal shafts) are necessary; 4) Periodic maintenance is mandatory: oil checks, control of screw compressors every 10.000-15.000 hours, vibration surveillance programme, etc; 5) Special control and maintenance of utilities equipment (supply of cooling water, compressed air and electrical supply) is necessary; 6) Periodic vacuum checks to identify leakage appearance such as insulation vacuum of transfer lines and distribution boxes are necessary; 7) Easily exchangeable cold compressors are required

  13. Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options

    International Nuclear Information System (INIS)

    Batlle, Carlos; Vazquez, Carlos; Rivier, Michel; Perez-Arriaga, Ignacio J.

    2007-01-01

    There has been total unanimity about the vital importance of reliability of supply since the beginning of the electricity sector deregulation process. This paper describes the procedure proposed by to improve upon the current scheme to guarantee a reasonable reserve margin, the capacity payment mechanism. This alternative design introduces improvements aimed at guaranteeing at least a minimum capacity reserve margin, as well as at providing a strong incentive for generating units to be available when needed, namely, in situations when supply is likely to be insufficient to meet the total demand

  14. Impact of Hybrid Water Supply on the Centralised Water System

    Directory of Open Access Journals (Sweden)

    Robert Sitzenfrei

    2017-11-01

    Full Text Available Traditional (technical concepts to ensure a reliable water supply, a safe handling of wastewater and flood protection are increasingly criticised as outdated and unsustainable. These so-called centralised urban water systems are further maladapted to upcoming challenges because of their long lifespan in combination with their short-sighted planning and design. A combination of (existing centralised and decentralised infrastructure is expected to be more reliable and sustainable. However, the impact of increasing implementation of decentralised technologies on the local technical performance in sewer or water supply networks and the interaction with the urban form has rarely been addressed in the literature. In this work, an approach which couples the UrbanBEATS model for the planning of decentralised strategies together with a water supply modelling approach is developed and applied to a demonstration case. With this novel approach, critical but also favourable areas for such implementations can be identified. For example, low density areas, which have high potential for rainwater harvesting, can result in local water quality problems in the supply network when further reducing usually low pipe velocities in these areas. On the contrary, in high demand areas (e.g., high density urban forms there is less effect of rainwater harvesting due to the limited available space. In these high density areas, water efficiency measures result in the highest savings in water volume, but do not cause significant problems in the technical performance of the potable water supply network. For a more generalised and case-independent conclusion, further analyses are performed for semi-virtual benchmark networks to answer the question of an appropriate representation of the water distribution system in a computational model for such an analysis. Inappropriate hydraulic model assumptions and characteristics were identified for the stated problem, which have more

  15. Stability analyses of urban water supply systems with wastewater reuse; Toshi haisui no junkan riyo ni yoru mizu kyokyu anteika ni kansuru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, H.; Zhang, S. [Meijo Univ., Nagoya (Japan); Okada, N. [Kyoto Univ., Kyoto (Japan). Disaster Prevention Research Inst.

    1995-10-20

    Wastewater reuse can be considered as a type of water resource development which is expected to improve the aquatic environment, as well as the stability and reliability of municipal water supply systems. To this extent, wastewater reuse has been taken into account in the planning of water supply systems in several Japanese cities. However, to date the effect of wastewater reuse on water supply system stabilization has not been discussed quantitatively, and the relation between waster water reuse rate and water supply system stability has not been analyzed. In this study, a stochastic model has been presented to evaluate the stability of water supply systems with optimal wastewater reuse rate. Some theoretical analyses and numerical studies were performed, and all of the results have shown that the model is reliable for not only basic studies on water supply system stability, but also for practical use as well. 5 refs., 5 figs., 3 tabs.

  16. Alternative power supply systems for remote industrial customers

    Science.gov (United States)

    Kharlamova, N. V.; Khalyasmaa, A. I.; Eroshenko, S. A.

    2017-06-01

    The paper addresses the problem of alternative power supply of remote industrial clusters with renewable electric energy generation. As a result of different technologies comparison, consideration is given to wind energy application. The authors present a methodology of mean expected wind generation output calculation, based on Weibull distribution, which provides an effective express-tool for preliminary assessment of required installed generation capacity. The case study is based on real data including database of meteorological information, relief characteristics, power system topology etc. Wind generation feasibility estimation for a specific territory is followed by power flow calculations using Monte Carlo methodology. Finally, the paper provides a set of recommendations to ensure safe and reliable power supply for the final customers and, subsequently, to provide sustainable development of the regions, located far from megalopolises and industrial centres.

  17. First Assessment of Reliability Data for the LHC Accelerator and Detector Cryogenic System Components

    CERN Document Server

    Perinic, G; Alonso-Canella, I; Balle, C; Barth, K; Bel, J F; Benda, V; Bremer, J; Brodzinski, K; Casas-Cubillos, J; Cuccuru, G; Cugnet, M; Delikaris, D; Delruelle, N; Dufay-Chanat, L; Fabre, C; Ferlin, G; Fluder, C; Gavard, E; Girardot, R; Haug, F; Herblin, L; Junker, S; Klabi , T; Knoops, S; Lamboy, J P; Legrand, D; Metselaar, J; Park, A; Perin, A; Pezzetti, M; Penacoba-Fernandez, G; Pirotte, O; Rogez, E; Suraci, A; Stewart, L; Tavian, L J; Tovar-Gonzalez, A; Van Weelderen, R; Vauthier, N; Vullierme, B; Wagner, U

    2012-01-01

    The Large Hadron Collider (LHC) cryogenic system comprises eight independent refrigeration and distribution systems that supply the eight 3.3 km long accelerator sectors with cryogenic refrigeration power as well as four refrigeration systems for the needs of the detectors ATLAS and CMS. In order to ensure the highest possible reliability of the installations, it is important to apply a reliability centred approach for the maintenance. Even though large scale cryogenic refrigeration exists since the mid 20th century, very little third party reliability data is available today. CERN has started to collect data with its computer aided maintenance management system (CAMMS) in 2009, when the accelerator has gone into normal operation. This paper presents the reliability observations from the operation and the maintenance side, as well as statistical data collected by the means of the CAMMS system.

  18. Optimizing the design and operation of reactor emergency systems using reliability analysis techniques

    International Nuclear Information System (INIS)

    Snaith, E.R.

    1975-01-01

    Following a reactor trip various reactor emergency systems, e.g. essential power supplies, emergency core cooling and boiler feed water arrangements are required to operate with a high degree of reliability. These systems must therefore be critically assessed to confirm their capability of operation and determine their reliability of performance. The use of probability analysis techniques enables the potential operating reliability of the systems to be calculated and this can then be compared with the overall reliability requirements. However, a system reliability analysis does much more than calculate an overall reliability value for the system. It establishes the reliability of all parts of the system and thus identifies the most sensitive areas of unreliability. This indicates the areas where any required improvements should be made and enables the overall systems' designs and modes of operation to be optimized, to meet the system and hence the overall reactor safety criteria. This paper gives specific examples of sensitive areas of unreliability that were identified as a result of a reliability analysis that was carried out on a reactor emergency core cooling system. Details are given of modifications to design and operation that were implemented with a resulting improvement in reliability of various reactor sub-systems. The report concludes that an initial calculation of system reliability should represent only the beginning of continuing process of system assessment. Data on equipment and system performance, particularly in those areas shown to be sensitive in their effect on the overall nuclear power plant reliability, should be collected and processed to give reliability data. These data should then be applied in further probabilistic analyses and the results correlated with the original analysis. This will demonstrate whether the required and the originally predicted system reliability is likely to be achieved, in the light of the actual history to date of

  19. Improving the Reliability of LDP through the Divergence of Power Supply for LDP

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Bang Sil [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The representative operating systems are Large Display Panel (LDP), Operator Workstation (OWS), Computerized Procedure System (CPS). The LDP provides the information which is plant essential safety function, plant operating mode, the state of major operating variable and the important alarm to operator continuously. In case of malfunction and switchover fail of the inverter, it is possible to occur the power loss of LDP. The power of LDP and operator console workstation had been supplied by only 2 non-safety Power Line1/Power Line2 (P.L1/P.L2). This study mentioned the divergence of power for LDP as method of power loss caused by unreliability of inverter. Ultimately, LDP power line has been added, and then it is more improved on the safety of LDP operation than before. So Shin-Kori 3,4 can enhance the reliability and economic, safety of plant.

  20. Power stores and power electronics. Elements for a stable and reliable vehicle power supply system; Energiespeicher und Leistungselektronik. Elemente fuer ein stabiles und zuverlaessiges Bordnetz

    Energy Technology Data Exchange (ETDEWEB)

    Nalbach, Marc; Hoff, Carsten; Olk, Joachim; Schoellmann, Matthias [Hella KGaA Hueck und Co., Lippstadt (Germany); Schick, Detlef [Atmel, Garching (Germany)

    2008-07-01

    The demand for fuel efficient technologies in automotive applications is driven by the ongoing and increased CO{sub 2} discussion respective the upcoming tightening of the law as well as by the exhaustion of the worldwide oil resources. Today, micro-hybrid cars using idle stop, micro-regenerative braking and/or electrification of auxiliary components deliver a cost efficient approach within the 14V E/E energy system. Furthermore, the optimization of the components themselves like turbo-charging of the combustion engine, tyres with a low rolling friction as well as weight reduction and LED lighting has a significant impact on the car efficiency. But the implementations of idle stop plus additional innovations like electrical power steering are able to jeopardize the stability of the vehicle electrical power system by its amount of electrical energy and power consumption. Contrary, these mechatronics and actuators need a reliable power supply especially if they are safety critical. To ensure the stability of the power supply the ratio of energy storage and power resources has to be balanced within the E/E system. Within this paper the optimization of energy and power resources is shown using an exemplary application and how this approach could be extrapolated to the whole automobile power system. (orig.)

  1. System Reliability Engineering

    International Nuclear Information System (INIS)

    Lim, Tae Jin

    2005-02-01

    This book tells of reliability engineering, which includes quality and reliability, reliability data, importance of reliability engineering, reliability and measure, the poisson process like goodness of fit test and the poisson arrival model, reliability estimation like exponential distribution, reliability of systems, availability, preventive maintenance such as replacement policies, minimal repair policy, shock models, spares, group maintenance and periodic inspection, analysis of common cause failure, and analysis model of repair effect.

  2. Design of ion-pump power supply control software system based on TCP/IP protocol

    International Nuclear Information System (INIS)

    Lin Feiyu; Huang Jijiang; Guo Yuhui; Fang Zheng; Wang Yanyu

    2009-01-01

    This paper discuss a Ion-pump Power Supply control system making use of RS232 series bus and Intranet. The system's hardware VAC800 is composed of MSP430F149 mixed-signal processors produced by TI and UA7000A network model. MSP430F149 has advantages of ultra-low-power and high-integration. The Ion-pump Power Supply control system has the characteristics of strong function, simple structure, high reliability, strong resistance of noise, no peripheral chip, etc. Visual studio 2005 is used to design the system's software. The Ion-pump Power supplier control system can remotely monitor and control Ion-pump Power Suppliers. (authors)

  3. The integrated North American electricity market : a bi-national model for securing a reliable supply of electricity

    International Nuclear Information System (INIS)

    Egan, T.

    2004-03-01

    The 50 million people who experienced the power blackout on August 14, 2003 in southern Ontario and the U.S. Midwest and Northeast understood how vital electricity is in our day-to-day lives, but they also saw the resiliency of the North American electricity system. More than 65 per cent of the power generation was restored to service within 12 hours and no damage was caused to the generation or transmission facilities. Although the interconnected North American electricity system is among the most reliable in the world, it is threatened by an aging infrastructure, lack of new generation and transmission to meet demand, and growing regulatory pressures. This report suggests that any measures that respond to the threat of ongoing reliability should be bi-national in scope due to the interconnected nature of the system. Currently, the market, regulatory and administrative systems are different in each country. The full engagement and cooperation of both Canada and the United States is important to ensure future cross-border trade and power reliability. The Canadian Electricity Association proposes the following 7 measures: (1) support an open debate on all the supply options available to meet growing power demands, (2) promote bi-national cooperation in the construction of new transmission capacity to ensure a reliable continental electricity system, (3) examine opportunities for bi-national cooperation for investment in advanced transmission technologies and transmission research and development, (4) promote new generation technology and demand-side measures to relieve existing transmission constraints and reduce the need for new transmission facilities, (5) endorse a self-governing international organization for developing and enforcing mandatory reliability standards for the electricity industry, (6) coordinate measures to promote critical infrastructure protection, and (7) harmonize U.S. and Canadian efforts to streamline or clarify regulation of electricity

  4. Potential impacts of climate warming on water supply reliability in the Tuolumne and Merced River Basins, California.

    Directory of Open Access Journals (Sweden)

    Michael Kiparsky

    Full Text Available We present an integrated hydrology/water operations simulation model of the Tuolumne and Merced River Basins, California, using the Water Evaluation and Planning (WEAP platform. The model represents hydrology as well as water operations, which together influence water supplied for agricultural, urban, and environmental uses. The model is developed for impacts assessment using scenarios for climate change and other drivers of water system behavior. In this paper, we describe the model structure, its representation of historical streamflow, agricultural and urban water demands, and water operations. We describe projected impacts of climate change on hydrology and water supply to the major irrigation districts in the area, using uniform 2 °C, 4 °C, and 6 °C increases applied to climate inputs from the calibration period. Consistent with other studies, we find that the timing of hydrology shifts earlier in the water year in response to temperature warming (5-21 days. The integrated agricultural model responds with increased water demands 2 °C (1.4-2.0%, 4 °C (2.8-3.9%, and 6 °C (4.2-5.8%. In this sensitivity analysis, the combination of altered hydrology and increased demands results in decreased reliability of surface water supplied for agricultural purposes, with modeled quantity-based reliability metrics decreasing from a range of 0.84-0.90 under historical conditions to 0.75-0.79 under 6 °C warming scenario.

  5. Reliability Equivalence to Symmetrical UHVDC Transmission Systems Considering Redundant Structure Configuration

    Directory of Open Access Journals (Sweden)

    Xing Jiang

    2018-03-01

    Full Text Available In recent years, the ultra-high voltage direct current (UHVDC transmission system has been developed rapidly for its significant long-distance, high-capacity and low-loss properties. Equipment failures and overall outages of the UHVDC system have increasingly vital influence on the power supply of the receiving end grid. To improve the reliability level of UHVDC systems, a quantitative selection and configuration approach of redundant structures is proposed in this paper, which is based on multi-state reliability equivalence. Specifically, considering the symmetry characteristic of an UHVDC system, a state space model is established as a monopole rather than a bipole, which effectively reduces the state space dimensions to be considered by deducing the reliability merging operator of two poles. Considering the standby effect of AC filters and the recovery effect of converter units, the number of available converter units and corresponding probability are expressed with in universal generating function (UGF form. Then, a sensitivity analysis is performed to quantify the impact of component reliability parameters on system reliability and determine the most specific devices that should be configured in the redundant structure. Finally, a cost-benefit analysis is utilized to help determine the optimal scheme of redundant devices. Case studies are conducted to demonstrate the effectiveness and accuracy of the proposed method. Based on the numerical results, configuring a set of redundant transformers is indicated to be of the greatest significance to improve the reliability level of UHVDC transmission systems.

  6. Dependent systems reliability estimation by structural reliability approach

    DEFF Research Database (Denmark)

    Kostandyan, Erik; Sørensen, John Dalsgaard

    2014-01-01

    Estimation of system reliability by classical system reliability methods generally assumes that the components are statistically independent, thus limiting its applicability in many practical situations. A method is proposed for estimation of the system reliability with dependent components, where...... the leading failure mechanism(s) is described by physics of failure model(s). The proposed method is based on structural reliability techniques and accounts for both statistical and failure effect correlations. It is assumed that failure of any component is due to increasing damage (fatigue phenomena...... identification. Application of the proposed method can be found in many real world systems....

  7. Fault Analysis of ITER Coil Power Supply System

    International Nuclear Information System (INIS)

    Song, In Ho; Jun, Tao; Benfatto, Ivone

    2009-01-01

    The ITER magnet coils are all designed using superconductors with high current carrying capability. The Toroidal Field (TF) coils operate in a steadystate mode with a current of 68 kA and discharge the stored energy in case of quench with using 9 interleaved Fast Discharge Units (FDUs). The Central Solenoid (CS) coils and Poloidal Field (PF) coils operate in a pulse mode with currents of up to 45 kA and require fast variation of currents inducing more than 10 kV during normal operation on the coil terminals using Switching Network (SN) systems (CSs, PF1 and 6) and Booster and VS converters (PF2 to 5), which are series connected to Main converters. SN and FDU systems comprise high current DC circuit breakers and resistors for generating high voltage (SN) and to dissipate magnetic energy (FDUs). High transient voltages can arise due to the switching operation of SN and FD and the characteristics of resistors and stray components of DC distribution systems. Also, faults in power supply control such as shorts or grounding faults can produce higher voltages between terminals and between terminal and ground. Therefore, the design of the coil insulation, coil terminal regions, feeders, feed throughs, pipe breaks and instrumentation must take account of these high voltages during normal and abnormal conditions. Voltage insulation level can be defined and it is necessary to test the coils at higher voltages, to be sure of reliable performance during the lifetime of operation. This paper describes the fault analysis of the TF, CS and PF coil power supply systems, taking account of the stray parameter of the power supply and switching systems and inductively coupled superconducting coil models. Resistor grounding systems are included in the simulation model and all fault conditions such as converter hardware and software faults, switching system hardware and software faults, DC short circuits and single grounding faults are simulated. The occurrence of two successive faults

  8. Prognostic Health Management for Avionics System Power Supplies

    National Research Council Canada - National Science Library

    Orsagh, Rolf; Brown, Douglas; Roemer, Michael; Dabney, Thomas; Hess, Andrew

    2005-01-01

    This paper presents an integrated approach to switching mode power supply health management that implements techniques from engineering disciplines including statistical reliability modeling, damage...

  9. 600W uninterruptible power supply

    Energy Technology Data Exchange (ETDEWEB)

    Frizell, C

    1988-01-01

    Although the mains power supply in western Europe is normally reliable, power failures, transients and noise can cause loss or corruption of data held on personal computers. The design of an uninterruptible power supply system (UPS) based on well proven technology, is described.

  10. A Newly Developed Method for Computing Reliability Measures in a Water Supply Network

    Directory of Open Access Journals (Sweden)

    Jacek Malinowski

    2016-01-01

    Full Text Available A reliability model of a water supply network has beens examined. Its main features are: a topology that can be decomposed by the so-called state factorization into a (relativelysmall number of derivative networks, each having a series-parallel structure (1, binary-state components (either operative or failed with given flow capacities (2, a multi-state character of the whole network and its sub-networks - a network state is defined as the maximal flow between a source (sources and a sink (sinks (3, all capacities (component, network, and sub-network have integer values (4. As the network operates, its state changes due to component failures, repairs, and replacements. A newly developed method of computing the inter-state transition intensities has been presented. It is based on the so-called state factorization and series-parallel aggregation. The analysis of these intensities shows that the failure-repair process of the considered system is an asymptotically homogenous Markov process. It is also demonstrated how certain reliability parameters useful for the network maintenance planning can be determined on the basis of the asymptotic intensities. For better understanding of the presented method, an illustrative example is given. (original abstract

  11. A high pulsed power supply system designed for pulsed high magnetic field

    International Nuclear Information System (INIS)

    Liu Kefu; Wang Shaorong; Zhong Heqing; Xu Yan; Pan Yuan

    2008-01-01

    This paper introduces the design of high pulsed power supply system for producing pulsed high magnetic field up to 70 T. This system consists of 58 sets of 55 μF of capacitor bank which provides 1.0 MJ energy storage. A set of vacuum closing switch is chosen as main switch for energy discharge into magnetic coil. A crowbar circuit with high power diodes in series with resistor is used to absorb the redundant energy and adjust pulse width. The resistance of magnetic coil changing with current is deduced by energy balance equations. A capacitor-charging power supply using a series-resonant, constant on-time variable frequency control, and zero-current switching charges the capacitor bank in one minute time with high efficiency. The pulsed power supply provides adjustable current and pulse width with 30 kA peak and 30 ms maximum. The primary experiments demonstrate the system reliability. This work provides an engineering guidance for future development of pulsed high magnetic field. (authors)

  12. [Application of supply chain integration management of medical consumables].

    Science.gov (United States)

    Zhang, Jian

    2013-07-01

    This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.

  13. Charging system of ECRH high-voltage power supply and its control system

    International Nuclear Information System (INIS)

    Hu Guofu; Ding Tonghai; Liu Baohua; Jiang Shufang

    2003-01-01

    High-voltage power supply (HVPS) of Electron Cyclotron Resonance Heating (ECRH) for HT-7 and HT-7U is presently being constructed. The high voltage (100 kV) energy of HVPS is stored in the capacitor banks, and they can power one or two gyrotrons. All the operation of the charging system will be done by the control system, where the field signals are interfaced to programmable logic controller (PLC). The use of PLC not only simplifies the control system, but also enhances the reliability. The software written by using configuration software installed in the master computer allows for remote and multiple operator control, and the status and data information is also remotely available

  14. Reliability research based experience with systems and events at the Kozloduy NPP units 1-4

    Energy Technology Data Exchange (ETDEWEB)

    Khristova, R; Kaltchev, B; Dimitrov, B [Energoproekt, Sofia (Bulgaria); Nedyalkova, D; Sonev, A [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1996-12-31

    An overview of equipment reliability based on operational data of selected safety systems at the Kozloduy NPP is presented. Conclusions are drawn on reliability of the service water system, feed water system, emergency power supply - category 2, emergency high pressure ejection system and spray system. For the units 1-4 all recorded accident protocols in the period 1974-1993 have been processed and the main initiators identified. A list with 39 most frequent initiators of accidents/incidents is compiled. The human-caused errors account for 27% of all events. The reliability characteristics and frequencies have been calculated for all initiating events. It is concluded that there have not been any accidents with consequences for fuel integrity or radioactive release. 14 refs.

  15. Reliability research based experience with systems and events at the Kozloduy NPP units 1-4

    International Nuclear Information System (INIS)

    Khristova, R.; Kaltchev, B.; Dimitrov, B.; Nedyalkova, D.; Sonev, A.

    1995-01-01

    An overview of equipment reliability based on operational data of selected safety systems at the Kozloduy NPP is presented. Conclusions are drawn on reliability of the service water system, feed water system, emergency power supply - category 2, emergency high pressure ejection system and spray system. For the units 1-4 all recorded accident protocols in the period 1974-1993 have been processed and the main initiators identified. A list with 39 most frequent initiators of accidents/incidents is compiled. The human-caused errors account for 27% of all events. The reliability characteristics and frequencies have been calculated for all initiating events. It is concluded that there have not been any accidents with consequences for fuel integrity or radioactive release. 14 refs

  16. Design of Supply Chain Networks with Supply Disruptions using Genetic Algorithm

    OpenAIRE

    Taha, Raghda; Abdallah, Khaled; Sadek, Yomma; El-Kharbotly, Amin; Afia, Nahid

    2014-01-01

    The design of supply chain networks subject to disruptions is tackled. A genetic algorithm with the objective of minimizing the design cost and regret cost is developed to achieve a reliable supply chain network. The improvement of supply chain network reliability is measured against the supply chain cost.

  17. Reliability Approach of a Compressor System using Reliability Block ...

    African Journals Online (AJOL)

    pc

    2018-03-05

    Mar 5, 2018 ... This paper presents a reliability analysis of such a system using reliability ... Keywords-compressor system, reliability, reliability block diagram, RBD .... the same structure has been kept with the three subsystems: air flow, oil flow and .... and Safety in Engineering Design", Springer, 2009. [3] P. O'Connor ...

  18. Hybrid renewable energy system application for electricity and heat supply of a residential building

    Directory of Open Access Journals (Sweden)

    Nakomčić-Smaragdakis Branka B.

    2016-01-01

    Full Text Available Renewable and distributed energy systems could provide a solution to the burning issue of reliable and clean supply of energy, having in mind current state and future predictions for population growth and fossil fuel scarcity. Hybrid renewable energy systems are novelty in Serbia and warrant further detailed research. The aim of this paper is to analyze the application of renewable energy sources(RES for electricity and heat supply of a typical household in Serbia, as well as the cost-effectiveness of the proposed system. The influence of feed-in tariff change on the value of the investment is analyzed. Small, grid-connected hybrid system (for energy supply of a standard household, consisting of geothermal heat pump for heating/cooling, solar photovoltaic panels and small wind turbine for power supply is analyzed as a case study. System analysis was conducted with the help of RETScreen software. Results of techno-economics analysis have shown that investing in geothermal heat pump and photovoltaic panels is cost-effective, while that is not the case with small wind turbine.

  19. Optimal integrated sizing and planning of hubs with midsize/large CHP units considering reliability of supply

    International Nuclear Information System (INIS)

    Moradi, Saeed; Ghaffarpour, Reza; Ranjbar, Ali Mohammad; Mozaffari, Babak

    2017-01-01

    Highlights: • New hub planning formulation is proposed to exploit assets of midsize/large CHPs. • Linearization approaches are proposed for two-variable nonlinear CHP fuel function. • Efficient operation of addressed CHPs & hub devices at contingencies are considered. • Reliability-embedded integrated planning & sizing is formulated as one single MILP. • Noticeable results for costs & reliability-embedded planning due to mid/large CHPs. - Abstract: Use of multi-carrier energy systems and the energy hub concept has recently been a widespread trend worldwide. However, most of the related researches specialize in CHP systems with constant electricity/heat ratios and linear operating characteristics. In this paper, integrated energy hub planning and sizing is developed for the energy systems with mid-scale and large-scale CHP units, by taking their wide operating range into consideration. The proposed formulation is aimed at taking the best use of the beneficial degrees of freedom associated with these units for decreasing total costs and increasing reliability. High-accuracy piecewise linearization techniques with approximation errors of about 1% are introduced for the nonlinear two-dimensional CHP input-output function, making it possible to successfully integrate the CHP sizing. Efficient operation of CHP and the hub at contingencies is extracted via a new formulation, which is developed to be incorporated to the planning and sizing problem. Optimal operation, planning, sizing and contingency operation of hub components are integrated and formulated as a single comprehensive MILP problem. Results on a case study with midsize CHPs reveal a 33% reduction in total costs, and it is demonstrated that the proposed formulation ceases the need for additional components/capacities for increasing reliability of supply.

  20. Multidisciplinary System Reliability Analysis

    Science.gov (United States)

    Mahadevan, Sankaran; Han, Song; Chamis, Christos C. (Technical Monitor)

    2001-01-01

    The objective of this study is to develop a new methodology for estimating the reliability of engineering systems that encompass multiple disciplines. The methodology is formulated in the context of the NESSUS probabilistic structural analysis code, developed under the leadership of NASA Glenn Research Center. The NESSUS code has been successfully applied to the reliability estimation of a variety of structural engineering systems. This study examines whether the features of NESSUS could be used to investigate the reliability of systems in other disciplines such as heat transfer, fluid mechanics, electrical circuits etc., without considerable programming effort specific to each discipline. In this study, the mechanical equivalence between system behavior models in different disciplines are investigated to achieve this objective. A new methodology is presented for the analysis of heat transfer, fluid flow, and electrical circuit problems using the structural analysis routines within NESSUS, by utilizing the equivalence between the computational quantities in different disciplines. This technique is integrated with the fast probability integration and system reliability techniques within the NESSUS code, to successfully compute the system reliability of multidisciplinary systems. Traditional as well as progressive failure analysis methods for system reliability estimation are demonstrated, through a numerical example of a heat exchanger system involving failure modes in structural, heat transfer and fluid flow disciplines.

  1. Reliability Indicators of Urban Electric Network Schemes for Supply of Second and Third Category Consumers

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2012-01-01

    Full Text Available The paper considers two schemes of the urban distributive electric network for supply of the second and third category consumers for whom indicators of reliability have been determined.As for a network scheme of the 2nd category it has been determined that while installing low-oil and vacuum switches at a distributive point the most remote transformer substation has the highest non-availability  factor which is higher of the corresponding non-availability  factor of the nearest transformer substation by 1,21–1,23 fold  accordingly.As for a network scheme of the 3rd category consumers it has been obtained the data that reliability of consumers receiving supply from bus-bars of transformer substations with 0,38 kW voltage changes  significantly (by 1,2–1,9-fold while changing a breakpoint of the network with 10 kW voltage.

  2. Developing the Water Supply System for Travel to Mars

    Science.gov (United States)

    Jones, Harry W.; Fisher, John W.; Delzeit, Lance D.; Flynn, Michael T.; Kliss, Mark H.

    2016-01-01

    What water supply method should be used on a trip to Mars? Two alternate approaches are using fuel cell and stored water, as was done for short missions such as Apollo and the Space Shuttle, or recycling most of the water, as on long missions including the International Space Station (ISS). Stored water is inexpensive for brief missions but its launch mass and cost become very large for long missions. Recycling systems have much lower total mass and cost for long missions, but they have high development cost and are more expensive to operate than storage. A Mars transit mission would have an intermediate duration of about 450 days out and back. Since Mars transit is about ten times longer than a brief mission but probably less than one-tenth as long as ISS, it is not clear if stored or recycled water would be best. Recycling system design is complicated because water is used for different purposes, drinking, food preparation, washing, and flushing the urinal, and because wastewater has different forms, humidity condensate, dirty wash water, and urine and flush water. The uses have different requirements and the wastewater resources have different contaminants and processing requirements. The most cost-effective water supply system may recycle some wastewater sources and also provide safety reserve water from storage. Different water supply technologies are compared using mass, cost, reliability, and other factors.

  3. Reliable design of a closed loop supply chain network under uncertainty: An interval fuzzy possibilistic chance-constrained model

    Science.gov (United States)

    Vahdani, Behnam; Tavakkoli-Moghaddam, Reza; Jolai, Fariborz; Baboli, Arman

    2013-06-01

    This article seeks to offer a systematic approach to establishing a reliable network of facilities in closed loop supply chains (CLSCs) under uncertainties. Facilities that are located in this article concurrently satisfy both traditional objective functions and reliability considerations in CLSC network designs. To attack this problem, a novel mathematical model is developed that integrates the network design decisions in both forward and reverse supply chain networks. The model also utilizes an effective reliability approach to find a robust network design. In order to make the results of this article more realistic, a CLSC for a case study in the iron and steel industry has been explored. The considered CLSC is multi-echelon, multi-facility, multi-product and multi-supplier. Furthermore, multiple facilities exist in the reverse logistics network leading to high complexities. Since the collection centres play an important role in this network, the reliability concept of these facilities is taken into consideration. To solve the proposed model, a novel interactive hybrid solution methodology is developed by combining a number of efficient solution approaches from the recent literature. The proposed solution methodology is a bi-objective interval fuzzy possibilistic chance-constraint mixed integer linear programming (BOIFPCCMILP). Finally, computational experiments are provided to demonstrate the applicability and suitability of the proposed model in a supply chain environment and to help decision makers facilitate their analyses.

  4. RTE - Reliability report 2016

    International Nuclear Information System (INIS)

    2017-06-01

    Every year, RTE produces a reliability report for the past year. This document lays out the main factors that affected the electrical power system's operational reliability in 2016 and the initiatives currently under way intended to ensure its reliability in the future. Within a context of the energy transition, changes to the European interconnected network mean that RTE has to adapt on an on-going basis. These changes include the increase in the share of renewables injecting an intermittent power supply into networks, resulting in a need for flexibility, and a diversification in the numbers of stakeholders operating in the energy sector and changes in the ways in which they behave. These changes are dramatically changing the structure of the power system of tomorrow and the way in which it will operate - particularly the way in which voltage and frequency are controlled, as well as the distribution of flows, the power system's stability, the level of reserves needed to ensure supply-demand balance, network studies, assets' operating and control rules, the tools used and the expertise of operators. The results obtained in 2016 are evidence of a globally satisfactory level of reliability for RTE's operations in somewhat demanding circumstances: more complex supply-demand balance management, cross-border schedules at interconnections indicating operation that is closer to its limits and - most noteworthy - having to manage a cold spell just as several nuclear power plants had been shut down. In a drive to keep pace with the changes expected to occur in these circumstances, RTE implemented numerous initiatives to ensure high levels of reliability: - maintaining investment levels of euro 1.5 billion per year; - increasing cross-zonal capacity at borders with our neighbouring countries, thus bolstering the security of our electricity supply; - implementing new mechanisms (demand response, capacity mechanism, interruptibility, etc.); - involvement in tests or projects

  5. Remote power supply by wind/diesel/battery systems - operational experience and economy

    International Nuclear Information System (INIS)

    Kniehl, R.; Cramer, G.; Toenges, K.H.

    1995-01-01

    To continuously supply remote villages and settlements not connected to the public grid with electric power is an ambitious technical task considering ecological and economical points of view. The German company SMA has developed a modular supply system as a solution for this task in the range of 30 kW to 5 MW. Meanwhile more than 20 applications of these 'Intelligent Power Systems (IPS)' have proved their technical reliability and economical competitiveness worldwide under different, and also extreme environmental conditions. Actually it is the first commercially available advanced Wind/Diesel/Battery System for remote area electrification. The modular autonomous electric supply systems realized by SMA basically consist of two or more diesel power sets, battery storage with converter, a rotating phaseshifter, and an optional number of wind turbines. All modules are coupled on the 3-phase AC system grid and run in various parallel configurations depending on the wind speed and the consumer power demand. The control system operates fully automatical and offers a very user-friendly graphical interface. This advanced system control also contains a remote control and operating data output via modem and telephone line. SMA and CES have considerable experience with Wind/Diesel/Battery Systems for more than eight years. In many cases wind energy converters in the power range of 30 to 40 kW were used, but it is also possible to use larger wind turbines (e.g. 250 kW). In the following the system technology is described in detail, experience of different system sizes in several countries of application is presented, and economical analyses for power supply by IPS are given in comparison to a conventional fully diesel power supply. (author)

  6. Remote power supply by wind/diesel/battery systems - operational experience and economy

    Energy Technology Data Exchange (ETDEWEB)

    Kniehl, R [CES - Consulting and Engineering Services, Heidelberg (Germany); Cramer, G; Toenges, K H [SMA Regelsysteme GmbH, Niestetal (Germany)

    1996-12-31

    To continuously supply remote villages and settlements not connected to the public grid with electric power is an ambitious technical task considering ecological and economical points of view. The German company SMA has developed a modular supply system as a solution for this task in the range of 30 kW to 5 MW. Meanwhile more than 20 applications of these `Intelligent Power Systems (IPS)` have proved their technical reliability and economical competitiveness worldwide under different, and also extreme environmental conditions. Actually it is the first commercially available advanced Wind/Diesel/Battery System for remote area electrification. The modular autonomous electric supply systems realized by SMA basically consist of two or more diesel power sets, battery storage with converter, a rotating phaseshifter, and an optional number of wind turbines. All modules are coupled on the 3-phase AC system grid and run in various parallel configurations depending on the wind speed and the consumer power demand. The control system operates fully automatical and offers a very user-friendly graphical interface. This advanced system control also contains a remote control and operating data output via modem and telephone line. SMA and CES have considerable experience with Wind/Diesel/Battery Systems for more than eight years. In many cases wind energy converters in the power range of 30 to 40 kW were used, but it is also possible to use larger wind turbines (e.g. 250 kW). In the following the system technology is described in detail, experience of different system sizes in several countries of application is presented, and economical analyses for power supply by IPS are given in comparison to a conventional fully diesel power supply. (author)

  7. Remote power supply by wind/diesel/battery systems - operational experience and economy

    Energy Technology Data Exchange (ETDEWEB)

    Kniehl, R. [CES - Consulting and Engineering Services, Heidelberg (Germany); Cramer, G.; Toenges, K.H. [SMA Regelsysteme GmbH, Niestetal (Germany)

    1995-12-31

    To continuously supply remote villages and settlements not connected to the public grid with electric power is an ambitious technical task considering ecological and economical points of view. The German company SMA has developed a modular supply system as a solution for this task in the range of 30 kW to 5 MW. Meanwhile more than 20 applications of these `Intelligent Power Systems (IPS)` have proved their technical reliability and economical competitiveness worldwide under different, and also extreme environmental conditions. Actually it is the first commercially available advanced Wind/Diesel/Battery System for remote area electrification. The modular autonomous electric supply systems realized by SMA basically consist of two or more diesel power sets, battery storage with converter, a rotating phaseshifter, and an optional number of wind turbines. All modules are coupled on the 3-phase AC system grid and run in various parallel configurations depending on the wind speed and the consumer power demand. The control system operates fully automatical and offers a very user-friendly graphical interface. This advanced system control also contains a remote control and operating data output via modem and telephone line. SMA and CES have considerable experience with Wind/Diesel/Battery Systems for more than eight years. In many cases wind energy converters in the power range of 30 to 40 kW were used, but it is also possible to use larger wind turbines (e.g. 250 kW). In the following the system technology is described in detail, experience of different system sizes in several countries of application is presented, and economical analyses for power supply by IPS are given in comparison to a conventional fully diesel power supply. (author)

  8. Measures for a reliable and environmental power supply. Massnahmen fuer eine sichere und umweltvertraegliche Energieversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Dolinski, U; Ziesing, H J

    1978-01-01

    This brochure, supplement and final part of a 1976 DIW study (Reliability, Pricing, and Environmental Aspects of Power Supply), presents the necessary technical and energy policy measures required for achieving certain goals in energy policy. Present and future measures taken in West Germany are presented. Effects and consequences of these steps are investigated, although a quantitative analysis was only possible in a few cases. Measures for ensuring the energy supply are listed according to energy sources; measures to reduce environmental pollution deal with pollutant emissions, thermal pollution, optical and acoustic load factors, and energy conservation.

  9. Calculating system reliability with SRFYDO

    Energy Technology Data Exchange (ETDEWEB)

    Morzinski, Jerome [Los Alamos National Laboratory; Anderson - Cook, Christine M [Los Alamos National Laboratory; Klamann, Richard M [Los Alamos National Laboratory

    2010-01-01

    SRFYDO is a process for estimating reliability of complex systems. Using information from all applicable sources, including full-system (flight) data, component test data, and expert (engineering) judgment, SRFYDO produces reliability estimates and predictions. It is appropriate for series systems with possibly several versions of the system which share some common components. It models reliability as a function of age and up to 2 other lifecycle (usage) covariates. Initial output from its Exploratory Data Analysis mode consists of plots and numerical summaries so that the user can check data entry and model assumptions, and help determine a final form for the system model. The System Reliability mode runs a complete reliability calculation using Bayesian methodology. This mode produces results that estimate reliability at the component, sub-system, and system level. The results include estimates of uncertainty, and can predict reliability at some not-too-distant time in the future. This paper presents an overview of the underlying statistical model for the analysis, discusses model assumptions, and demonstrates usage of SRFYDO.

  10. COMPOSITE METHOD OF RELIABILITY RESEARCH FOR HIERARCHICAL MULTILAYER ROUTING SYSTEMS

    Directory of Open Access Journals (Sweden)

    R. B. Tregubov

    2016-09-01

    Full Text Available The paper deals with the idea of a research method for hierarchical multilayer routing systems. The method represents a composition of methods of graph theories, reliability, probabilities, etc. These methods are applied to the solution of different private analysis and optimization tasks and are systemically connected and coordinated with each other through uniform set-theoretic representation of the object of research. The hierarchical multilayer routing systems are considered as infrastructure facilities (gas and oil pipelines, automobile and railway networks, systems of power supply and communication with distribution of material resources, energy or information with the use of hierarchically nested functions of routing. For descriptive reasons theoretical constructions are considered on the example of task solution of probability determination for up state of specific infocommunication system. The author showed the possibility of constructive combination of graph representation of structure of the object of research and a logic probable analysis method of its reliability indices through uniform set-theoretic representation of its elements and processes proceeding in them.

  11. Analysis of Parking Reliability Guidance of Urban Parking Variable Message Sign System

    Directory of Open Access Journals (Sweden)

    Zhenyu Mei

    2012-01-01

    Full Text Available Operators of parking guidance and information systems (PGIS often encounter difficulty in determining when and how to provide reliable car park availability information to drivers. Reliability has become a key factor to ensure the benefits of urban PGIS. The present paper is the first to define the guiding parking reliability of urban parking variable message signs (VMSs. By analyzing the parking choice under guiding and optional parking lots, a guiding parking reliability model was constructed. A mathematical program was formulated to determine the guiding parking reliability of VMS. The procedures were applied to a numerical example, and the factors that affect guiding reliability were analyzed. The quantitative changes of the parking berths and the display conditions of VMS were found to be the most important factors influencing guiding reliability. The parking guiding VMS achieved the best benefit when the parking supply was close to or was less than the demand. The combination of a guiding parking reliability model and parking choice behavior offers potential for PGIS operators to reduce traffic congestion in central city areas.

  12. Reliability Block Diagram (RBD) Analysis of NASA Dryden Flight Research Center (DFRC) Flight Termination System and Power Supply

    Science.gov (United States)

    Morehouse, Dennis V.

    2006-01-01

    In order to perform public risk analyses for vehicles containing Flight Termination Systems (FTS), it is necessary for the analyst to know the reliability of each of the components of the FTS. These systems are typically divided into two segments; a transmitter system and associated equipment, typically in a ground station or on a support aircraft, and a receiver system and associated equipment on the target vehicle. This analysis attempts to analyze the reliability of the NASA DFRC flight termination system ground transmitter segment for use in the larger risk analysis and to compare the results against two established Department of Defense availability standards for such equipment.

  13. Intermodal Supply Chain Risk Management

    OpenAIRE

    Maslarić, Marinko; Brnjac, Nikolina; Bago, Drago

    2016-01-01

    Efficient and secure global supply chains contribute to the Improvement of the competitiveness of the products traded on international markets by reducing their costs and delivery time while increasing the reliability and security. Global supply chains are unthinkable without transport integration, which is usually accomplished through the form of intermodal transport systems. Intermodal transport systems are much more complex than the unimodal ones due to the number of stakeholders, included...

  14. AC power supply systems

    International Nuclear Information System (INIS)

    Law, H.

    1987-01-01

    An ac power supply system includes a rectifier fed by a normal ac supply, and an inverter connected to the rectifier by a dc link, the inverter being effective to invert the dc output of the receiver at a required frequency to provide an ac output. A dc backup power supply of lower voltage than the normal dc output of the rectifier is connected across the dc link such that the ac output of the rectifier is derived from the backup supply if the voltage of the output of the inverter falls below that of the backup supply. The dc backup power may be derived from a backup ac supply. Use in pumping coolant in nuclear reactor is envisaged. (author)

  15. Passive safety systems reliability and integration of these systems in nuclear power plant PSA

    International Nuclear Information System (INIS)

    La Lumia, V.; Mercier, S.; Marques, M.; Pignatel, J.F.

    2004-01-01

    Innovative nuclear reactor concepts could lead to use passive safety features in combination with active safety systems. A passive system does not need active component, external energy, signal or human interaction to operate. These are attractive advantages for safety nuclear plant improvements and economic competitiveness. But specific reliability problems, linked to physical phenomena, can conduct to stop the physical process. In this context, the European Commission (EC) starts the RMPS (Reliability Methods for Passive Safety functions) program. In this RMPS program, a quantitative reliability evaluation of the RP2 system (Residual Passive heat Removal system on the Primary circuit) has been realised, and the results introduced in a simplified PSA (Probabilistic Safety Assessment). The scope is to get out experience of definition of characteristic parameters for reliability evaluation and PSA including passive systems. The simplified PSA, using event tree method, is carried out for the total loss of power supplies initiating event leading to a severe core damage. Are taken into account: failures of components but also failures of the physical process involved (e.g. natural convection) by a specific method. The physical process failure probabilities are assessed through uncertainty analyses based on supposed probability density functions for the characteristic parameters of the RP2 system. The probabilities are calculated by MONTE CARLO simulation coupled to the CATHARE thermalhydraulic code. The yearly frequency of the severe core damage is evaluated for each accident sequence. This analysis has identified the influence of the passive system RP2 and propose a re-dimensioning of the RP2 system in order to satisfy the safety probabilistic objectives for reactor core severe damage. (authors)

  16. Derivation of optimal joint operating rules for multi-purpose multi-reservoir water-supply system

    Science.gov (United States)

    Tan, Qiao-feng; Wang, Xu; Wang, Hao; Wang, Chao; Lei, Xiao-hui; Xiong, Yi-song; Zhang, Wei

    2017-08-01

    The derivation of joint operating policy is a challenging task for a multi-purpose multi-reservoir system. This study proposed an aggregation-decomposition model to guide the joint operation of multi-purpose multi-reservoir system, including: (1) an aggregated model based on the improved hedging rule to ensure the long-term water-supply operating benefit; (2) a decomposed model to allocate the limited release to individual reservoirs for the purpose of maximizing the total profit of the facing period; and (3) a double-layer simulation-based optimization model to obtain the optimal time-varying hedging rules using the non-dominated sorting genetic algorithm II, whose objectives were to minimize maximum water deficit and maximize water supply reliability. The water-supply system of Li River in Guangxi Province, China, was selected for the case study. The results show that the operating policy proposed in this study is better than conventional operating rules and aggregated standard operating policy for both water supply and hydropower generation due to the use of hedging mechanism and effective coordination among multiple objectives.

  17. Power system reliability impacts of wind generation and operational reserve requirements

    Directory of Open Access Journals (Sweden)

    Esteban Gil

    2015-06-01

    Full Text Available Due to its variability, wind generation integration presents a significant challenge to power system operators in order to maintain adequate reliability levels while ensuring least cost operation. This paper explores the trade-off between the benefits associated to a higher wind penetration and the additional operational reserve requirements that they impose. Such exploration is valued in terms of its effect on power system reliability, measured as an amount of unserved energy. The paper also focuses on how changing the Value of Lost Load (VoLL can be used to attain different reliability targets, and how wind power penetration and the diversity of the wind energy resource will impact quality of supply (in terms of instances of unserved energy. The evaluation of different penetrations of wind power generation, different wind speed profiles, wind resource diversity, and different operational reserve requirements, is conducted on the Chilean Northern Interconnected System (SING using statistical modeling of wind speed time series and computer simulation through a 24-hour ahead unit commitment algorithm and a Monte Carlo simulation scheme. Results for the SING suggest that while wind generation can significantly reduce generation costs, it can also imply higher security costs to reach acceptable reliability levels.

  18. Analysis of trends in the development of cities' heat supply systems

    Science.gov (United States)

    Stennikov, V. A.; Mednikova, E. E.

    2016-09-01

    New challenges—including the modern urban development policy, formation of the market of energy efficient technologies and different types of equipment of a broad power capacity range, tightening requirements to reliability, quality, and economic accessibility of heat supply—enhance the competitiveness of decentralized heat supply. In addition, its spontaneous growth and not always reasonable implementation lead to unjustified expenses, low efficiency, and ecological inconsistency. This proves the relevance of solving the problems of dividing an urban territory into zones of centralized heating (CH) and decentralized heating (DCH) along with their planning and justification, as well as determining a reasonable level of heat supply centralization and concentration of heat sources' power capacity. Solving these problems using the suggested method will allow optimizing the application areas for various types of heat supply and heat sources, justifying the degree of heat power capacity concentration and the extent of the systems as early as at the phase of a detailed urban planning project and then refining them during the design of urban heat supply systems. This will dramatically improve the reasonability of the decisions made and will simplify the procedure of their implementation. For criteria of limiting the extent (radius) of heat supply systems and defining their type, we suggest using standard values—the density of heat load per unit length of the pipeline and per unit area of urban territory. Standard values must be differentiated across the territory of Russia taking into account regional climatic and economic conditions and unique characteristics of heat supply development in cities and towns. The present article continues and develops the statements made in the previous articles created within the framework of the Theory of Hydraulic Circuits and takes into account the current situation and emerging trends in heat supply.

  19. Systems reliability analysis: applications of the SPARCS System-Reliability Assessment Computer Program

    International Nuclear Information System (INIS)

    Locks, M.O.

    1978-01-01

    SPARCS-2 (Simulation Program for Assessing the Reliabilities of Complex Systems, Version 2) is a PL/1 computer program for assessing (establishing interval estimates for) the reliability and the MTBF of a large and complex s-coherent system of any modular configuration. The system can consist of a complex logical assembly of independently failing attribute (binomial-Bernoulli) and time-to-failure (Poisson-exponential) components, without regard to their placement. Alternatively, it can be a configuration of independently failing modules, where each module has either or both attribute and time-to-failure components. SPARCS-2 also has an improved super modularity feature. Modules with minimal-cut unreliabiliy calculations can be mixed with those having minimal-path reliability calculations. All output has been standardized to system reliability or probability of success, regardless of the form in which the input data is presented, and whatever the configuration of modules or elements within modules

  20. Supply Chain Systems Architecture and Engineering Design: Green-field Supply Chain Integration

    OpenAIRE

    Radanliev, P

    2015-01-01

    This paper developed a new theory for supply chain architecture, and engineering design that enables integration of the business and supply chain strategies. The architecture starts with individual supply chain participants and derives insights into the complex and abstract concept of green-field integration design. The paper presented a conceptual system for depicting the interactions between business and supply chain strategy engineering. The system examines the decisions made when engineer...

  1. Reconstruction of Low Pressure Gas Supply System

    Directory of Open Access Journals (Sweden)

    S. N. Osipov

    2013-01-01

    Full Text Available The current reconstruction of residential areas in large cities especially with the developed heat-supply systems from thermal power stations and reduction of heat consumption for heating due to higher thermal resistance of building enclosing structures requires new technical solutions in respect of gas-supply problems. While making reconstruction of a gas-supply system of the modernized or new buildings in the operating zone of one gas-distribution plant it is necessary to change hot water-supply systems from gas direct-flow water heaters to centralized heat-supply and free gas volumes are to be used for other needs or gas-supply of new buildings with the current external gas distribution network.Selection of additional gas-line sections and points of gas-supply systems pertaining to new and reconstructed buildings for their connection to the current distribution system of gas-supply is to be executed in accordance with the presented methodology.

  2. Reliability of IGBT-based power devices in the viewpoint of applications in future power supply systems

    International Nuclear Information System (INIS)

    Lutz, J.

    2011-01-01

    IGBT-based high-voltage power devices will be key components for future renewable energy base of the society. Windmills in the range up to 10 MW use converters with IGBTs. HVDC systems with IGBT-based voltage source converters have the advantage of a lower level of harmonics, less efforts for filters and more possibilities for control. The power devices need a lifetime expectation of several ten years. The lifetime is determined by the reliability of the packaging technology. IGBTs are offered packaged in presspacks and modules. The presentation will have the focus on IGBT high power modules. Accelerated power cycling tests for to determine the end-of-life at given conditions and their results are shown. models to calculate the lifetime, and actual work in research for systems with increased reliability.

  3. A new model for reliability optimization of series-parallel systems with non-homogeneous components

    International Nuclear Information System (INIS)

    Feizabadi, Mohammad; Jahromi, Abdolhamid Eshraghniaye

    2017-01-01

    In discussions related to reliability optimization using redundancy allocation, one of the structures that has attracted the attention of many researchers, is series-parallel structure. In models previously presented for reliability optimization of series-parallel systems, there is a restricting assumption based on which all components of a subsystem must be homogeneous. This constraint limits system designers in selecting components and prevents achieving higher levels of reliability. In this paper, a new model is proposed for reliability optimization of series-parallel systems, which makes possible the use of non-homogeneous components in each subsystem. As a result of this flexibility, the process of supplying system components will be easier. To solve the proposed model, since the redundancy allocation problem (RAP) belongs to the NP-hard class of optimization problems, a genetic algorithm (GA) is developed. The computational results of the designed GA are indicative of high performance of the proposed model in increasing system reliability and decreasing costs. - Highlights: • In this paper, a new model is proposed for reliability optimization of series-parallel systems. • In the previous models, there is a restricting assumption based on which all components of a subsystem must be homogeneous. • The presented model provides a possibility for the subsystems’ components to be non- homogeneous in the required conditions. • The computational results demonstrate the high performance of the proposed model in improving reliability and reducing costs.

  4. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    International Nuclear Information System (INIS)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design

  5. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design.

  6. Improvements to the sodium supply system of a nuclear reactor core

    International Nuclear Information System (INIS)

    Chevallier, Rene; Marchais, Christian.

    1981-01-01

    This invention concerns an improvement to the sodium supply system of a nuclear reactor core and, in particular, concerns the area included between the outlet of the primary circulation pumps and the core proper. A simplified structure and a lightening of all this linking area between the circulation pumps and the distribution tank under the core is achieved and this results in a very significant reduction in the risks of deterioration and in a definite increase in the reliability of the reactor. The invention is therefore an improvement to the sodium supply system of the nuclear reactor core vessel with incorporated exchangers, in which the cool sodium, after passing through the primary exchangers, is collected in a ring compartment from whence it is taken up by the pumps and moved to at least one pipe reaching a distribution tank located under the reactor core [fr

  7. Increasing the reliability of electric energy supply to consumers in ROMAG-PROD Heavy Water Plant

    International Nuclear Information System (INIS)

    Barta, Ioan; Hanes, Marian . E-mail electrica@romag.ro

    2004-01-01

    Full text: This work aims at achieving an analysis of time evolution of the status of electrical installations, their performances and reliability, at describing the refurbishment measures adopted, at assessing the efficiency of these measures and also to suggest solutions for improving the reliability in the electric energy supply of ROMAG-PROD Heavy Water Plant. The analysis started from the original design, the manner the electrical installations were mounted, the technological level of this equipment and gives an evaluation of the deficiencies and the evolution of incidents occurred during the operation period. On the basis of the experience gathered one advances new items for equipment renewing and refurbishment of electric installations which together with the existing ones would ensure an electric energy supply more secure and efficient, leading directly to a more safe and efficient operation of the ROMAG-PROD Heavy Water Plant. In this work the incidents of electric energy nature which occurred are analyzed, the equipment which generated events identified and measures to solve these problems proposed

  8. Reliability of Power Electronic Converter Systems

    DEFF Research Database (Denmark)

    -link capacitance in power electronic converter systems; wind turbine systems; smart control strategies for improved reliability of power electronics system; lifetime modelling; power module lifetime test and state monitoring; tools for performance and reliability analysis of power electronics systems; fault...... for advancing the reliability, availability, system robustness, and maintainability of PECS at different levels of complexity. Drawing on the experience of an international team of experts, this book explores the reliability of PECS covering topics including an introduction to reliability engineering in power...... electronic converter systems; anomaly detection and remaining-life prediction for power electronics; reliability of DC-link capacitors in power electronic converters; reliability of power electronics packaging; modeling for life-time prediction of power semiconductor modules; minimization of DC...

  9. Demand Response Application forReliability Enhancement in Electricity Market

    OpenAIRE

    Romera Pérez, Javier

    2015-01-01

    The term reliability is related with the adequacy and security during operation of theelectric power system, supplying the electricity demand over time and saving thepossible contingencies because every inhabitant needs to be supplied with electricity intheir day to day. Operating the system in this way entails spending money. The first partof the project is going to be an analysis of the reliability and the economic impact of it.During the last decade, electric utilities and companies had be...

  10. Electric power supply for a mine: Principles and examples

    International Nuclear Information System (INIS)

    Mienville, G.; Grellety, J.

    1990-01-01

    The power supply of a water pumping system at the PEN or RAN mine is studied. A reliable pumping system was required because of the small volume of the available drainage reservoirs. Different power supply systems are considered. The 20 RV system configuration and adapted safety devices are described. The use of a generating set was required to ensure the mine operations. The power supply system in use allowed a reduction of the electricity cost [fr

  11. Multi-Disciplinary System Reliability Analysis

    Science.gov (United States)

    Mahadevan, Sankaran; Han, Song

    1997-01-01

    The objective of this study is to develop a new methodology for estimating the reliability of engineering systems that encompass multiple disciplines. The methodology is formulated in the context of the NESSUS probabilistic structural analysis code developed under the leadership of NASA Lewis Research Center. The NESSUS code has been successfully applied to the reliability estimation of a variety of structural engineering systems. This study examines whether the features of NESSUS could be used to investigate the reliability of systems in other disciplines such as heat transfer, fluid mechanics, electrical circuits etc., without considerable programming effort specific to each discipline. In this study, the mechanical equivalence between system behavior models in different disciplines are investigated to achieve this objective. A new methodology is presented for the analysis of heat transfer, fluid flow, and electrical circuit problems using the structural analysis routines within NESSUS, by utilizing the equivalence between the computational quantities in different disciplines. This technique is integrated with the fast probability integration and system reliability techniques within the NESSUS code, to successfully compute the system reliability of multi-disciplinary systems. Traditional as well as progressive failure analysis methods for system reliability estimation are demonstrated, through a numerical example of a heat exchanger system involving failure modes in structural, heat transfer and fluid flow disciplines.

  12. METHODS OF IMPROVING THE RELIABILITY OF THE CONTROL SYSTEM TRACTION POWER SUPPLY OF ELECTRIC TRANSPORT BASED ON AN EXPERT INFORMATION

    Directory of Open Access Journals (Sweden)

    O. O. Matusevych

    2009-03-01

    Full Text Available The author proposed the numerous methods of solving the multi-criterion task – increasing of reliability of control system on the basis of expert information. The information, which allows choosing thoughtfully the method of reliability increasing for a control system of electric transport, is considered.

  13. Oil inventories should be based on margins, supply reliability

    International Nuclear Information System (INIS)

    Waguespack, K.; Cantor, B.D.

    1996-01-01

    US oil inventories have plummeted to their lowest recorded levels this year, leading industry observers to conclude that refiners have adopted new just-in-time (JIT) inventory policies. Total crude oil inventories are about 300 million bbl -- 8% below the 10-year average. Distillate inventories posted similar declines this year because of unusually cold winter temperatures and refiners' reluctance to build sufficient stocks in the autumn months. Gasoline stocks are 20% below the 10-year average at 200 million bbl, despite forecasts of record-high gasoline demand this summer. The sudden drop in crude and product inventories this year is widely considered a sign that refiners have implemented JIT, signaling a permanent shift to reduced stocks. The authors submit that the shift towards reduced oil inventories is not related to a concerted adoption of JIT by US refiners, and that oil inventory management decisions should instead be based on refining margins and supply reliability. The paper discusses the JIT revolution and the optimal-inventory model

  14. Power supply system for KSTAR neutral beam injector

    Energy Technology Data Exchange (ETDEWEB)

    Cho, W., E-mail: franciscocho@nfri.re.kr; Bae, Y.S.; Han, W.S.; Jeong, J.H.; Kim, J.S.; Park, H.T.; Yang, H.L.; Oh, Y.K.; Kwak, J.G.

    2015-10-15

    Highlights: • The power supply system in KSTAR NBI consists of DC power supplies for ion source. • For operation NBI, DC High Voltage based on the low voltage transformer with chopper. • The surge absorber near the ion source limit the energy deposited to accelerator grid. - Abstract: The power supply system in KSTAR neutral beam injector consists of low voltage and high current DC power supplies for plasma generator of ion source and high voltage and high current DC power supply for accelerator grid system. The arc discharge is initiated by an arc power supply supplying the arc voltage between the chamber wall and 12 filaments which are heated by individual filament power supply. The negative output of arc power supply is common to each positive output of 12 filament power supplies. To interrupt the arc discharging for the fault condition of the arc current unbalance, DCCT current monitor is placed at the positive output cable of the filament power supply. The plasma grid (G1) power supply has the maximum capability of 120 kV/70 A which consists of low voltage regulator with IGBT-switched chopper array system for the voltage control in unit of 600 V and the high voltage rectified transformers to supply DC voltage of 20 kV, 30 kV, and 50 kV. The output voltage of the G1 power supply is also connected to the input of the voltage divider system which supplies the gradient voltage to the gradient grid (G2) in the range of 80–90% of G1 voltage by changing tap of winding resistors in unit of 1%. The charged G1 voltage is turned on and off by the high voltage switch (HVS) system consisting of MOSFET fast semiconductor switches which can immediately be opened less than 1 μs when the ion source grid breakdown occurs. The decelerating grid (G3) power supply is inverter system using capacitor-charge power supply to supply maximum −5 kV/5 A. The important component in power supply system is the surge absorber near the ion source to limit the arc energy deposited to

  15. Power supply system for KSTAR neutral beam injector

    International Nuclear Information System (INIS)

    Cho, W.; Bae, Y.S.; Han, W.S.; Jeong, J.H.; Kim, J.S.; Park, H.T.; Yang, H.L.; Oh, Y.K.; Kwak, J.G.

    2015-01-01

    Highlights: • The power supply system in KSTAR NBI consists of DC power supplies for ion source. • For operation NBI, DC High Voltage based on the low voltage transformer with chopper. • The surge absorber near the ion source limit the energy deposited to accelerator grid. - Abstract: The power supply system in KSTAR neutral beam injector consists of low voltage and high current DC power supplies for plasma generator of ion source and high voltage and high current DC power supply for accelerator grid system. The arc discharge is initiated by an arc power supply supplying the arc voltage between the chamber wall and 12 filaments which are heated by individual filament power supply. The negative output of arc power supply is common to each positive output of 12 filament power supplies. To interrupt the arc discharging for the fault condition of the arc current unbalance, DCCT current monitor is placed at the positive output cable of the filament power supply. The plasma grid (G1) power supply has the maximum capability of 120 kV/70 A which consists of low voltage regulator with IGBT-switched chopper array system for the voltage control in unit of 600 V and the high voltage rectified transformers to supply DC voltage of 20 kV, 30 kV, and 50 kV. The output voltage of the G1 power supply is also connected to the input of the voltage divider system which supplies the gradient voltage to the gradient grid (G2) in the range of 80–90% of G1 voltage by changing tap of winding resistors in unit of 1%. The charged G1 voltage is turned on and off by the high voltage switch (HVS) system consisting of MOSFET fast semiconductor switches which can immediately be opened less than 1 μs when the ion source grid breakdown occurs. The decelerating grid (G3) power supply is inverter system using capacitor-charge power supply to supply maximum −5 kV/5 A. The important component in power supply system is the surge absorber near the ion source to limit the arc energy deposited to

  16. Study on application of a high-speed trigger-type SFCL (TSFCL) for interconnection of power systems with different reliabilities

    International Nuclear Information System (INIS)

    Kim, Hye Ji; Yoon, Yong Tae

    2016-01-01

    Highlights: • Application of TSFCL to interconnect systems with different reliabilities is proposed. • TSFCL protects a grid by preventing detrimental effects from being delivered through the interconnection line. • A high-speed TSFCL with high impedance for transmission systems is required to be developed. - Abstract: Interconnection of power systems is one effective way to improve power supply reliability. However, differences in the reliability of each power system create a greater obstacle for the stable interconnection of power systems, as after interconnection a high-reliability system is affected by frequent faults in low reliability side systems. Several power system interconnection methods, such as the back-to-back method and the installation of either transformers or series reactors, have been investigated to counteract the damage caused by faults in the other neighboring systems. However, these methods are uneconomical and require complex operational management plans. In this work, a high-speed trigger-type superconducting fault current limiter (TSFCL) with large-impedance is proposed as a solution to maintain reliability and power quality when a high reliability power system is interconnected with a low reliability power system. Through analysis of the reliability index for the numerical examples obtained from a PSCAD/EMTDC simulator, a high-speed TSFCL with a large-impedance is confirmed to be effective for the interconnection between power systems with different reliabilities.

  17. Reliability and optimization of structural systems

    International Nuclear Information System (INIS)

    Thoft-Christensen, P.

    1987-01-01

    The proceedings contain 28 papers presented at the 1st working conference. The working conference was organized by the IFIP Working Group 7.5. The proceedings also include 4 papers which were submitted, but for various reasons not presented at the working conference. The working conference was attended by 50 participants from 18 countries. The conference was the first scientific meeting of the new IFIP Working Group 7.5 on 'Reliability and Optimization of Structural Systems'. The purpose of the Working Group 7.5 is to promote modern structural system optimization and reliability theory, to advance international cooperation in the field of structural system optimization and reliability theory, to stimulate research, development and application of structural system optimization and reliability theory, to further the dissemination and exchange of information on reliability and optimization of structural system optimization and reliability theory, and to encourage education in structural system optimization and reliability theory. (orig./HP)

  18. Decentralized supply of electricity is a favorable development. Analysis of system options and effects

    International Nuclear Information System (INIS)

    Faber, A.; Ros, J.; De Boer-Meulman, P.; In 't Groen, B.

    2010-01-01

    Decentralised electricity systems can provide a significant contribution to the development of environment-friendly techniques such as solar power and electric vehicles. However, there are also some obstacles and uncertainties. Not only does the balancing of supply and demand constitute an important challenge; the development of smart grids is also crucial to the improvement of reliability and system efficiency of the decentralized grids. Especially the distribution of investment costs is a decisive factor for the success rate of decentralized electricity systems. What is more, it is still uncertain whether an extensive decentralized system would have a higher score in cleanliness, affordability and reliability than a future central system. The system variants can be distinguished based on the deployment of six possible energy technologies for the future: PV (solar power), micro-CHP, small-scale wind energy in the built environment (urban wind), heat pumps, electric vehicles and air-conditioning. [nl

  19. Reliability-Based Optimization of Series Systems of Parallel Systems

    DEFF Research Database (Denmark)

    Enevoldsen, I.; Sørensen, John Dalsgaard

    1993-01-01

    Reliability-based design of structural systems is considered. In particular, systems where the reliability model is a series system of parallel systems are treated. A sensitivity analysis for this class of problems is presented. Optimization problems with series systems of parallel systems...... optimization of series systems of parallel systems, but it is also efficient in reliability-based optimization of series systems in general....

  20. Results of a Demonstration Assessment of Passive System Reliability Utilizing the Reliability Method for Passive Systems (RMPS)

    Energy Technology Data Exchange (ETDEWEB)

    Bucknor, Matthew; Grabaskas, David; Brunett, Acacia; Grelle, Austin

    2015-04-26

    Advanced small modular reactor designs include many advantageous design features such as passively driven safety systems that are arguably more reliable and cost effective relative to conventional active systems. Despite their attractiveness, a reliability assessment of passive systems can be difficult using conventional reliability methods due to the nature of passive systems. Simple deviations in boundary conditions can induce functional failures in a passive system, and intermediate or unexpected operating modes can also occur. As part of an ongoing project, Argonne National Laboratory is investigating various methodologies to address passive system reliability. The Reliability Method for Passive Systems (RMPS), a systematic approach for examining reliability, is one technique chosen for this analysis. This methodology is combined with the Risk-Informed Safety Margin Characterization (RISMC) approach to assess the reliability of a passive system and the impact of its associated uncertainties. For this demonstration problem, an integrated plant model of an advanced small modular pool-type sodium fast reactor with a passive reactor cavity cooling system is subjected to a station blackout using RELAP5-3D. This paper discusses important aspects of the reliability assessment, including deployment of the methodology, the uncertainty identification and quantification process, and identification of key risk metrics.

  1. Many-objective optimization and visual analytics reveal key trade-offs for London's water supply

    Science.gov (United States)

    Matrosov, Evgenii S.; Huskova, Ivana; Kasprzyk, Joseph R.; Harou, Julien J.; Lambert, Chris; Reed, Patrick M.

    2015-12-01

    In this study, we link a water resource management simulator to multi-objective search to reveal the key trade-offs inherent in planning a real-world water resource system. We consider new supplies and demand management (conservation) options while seeking to elucidate the trade-offs between the best portfolios of schemes to satisfy projected water demands. Alternative system designs are evaluated using performance measures that minimize capital and operating costs and energy use while maximizing resilience, engineering and environmental metrics, subject to supply reliability constraints. Our analysis shows many-objective evolutionary optimization coupled with state-of-the art visual analytics can help planners discover more diverse water supply system designs and better understand their inherent trade-offs. The approach is used to explore future water supply options for the Thames water resource system (including London's water supply). New supply options include a new reservoir, water transfers, artificial recharge, wastewater reuse and brackish groundwater desalination. Demand management options include leakage reduction, compulsory metering and seasonal tariffs. The Thames system's Pareto approximate portfolios cluster into distinct groups of water supply options; for example implementing a pipe refurbishment program leads to higher capital costs but greater reliability. This study highlights that traditional least-cost reliability constrained design of water supply systems masks asset combinations whose benefits only become apparent when more planning objectives are considered.

  2. Reliability and maintainability assessment factors for reliable fault-tolerant systems

    Science.gov (United States)

    Bavuso, S. J.

    1984-01-01

    A long term goal of the NASA Langley Research Center is the development of a reliability assessment methodology of sufficient power to enable the credible comparison of the stochastic attributes of one ultrareliable system design against others. This methodology, developed over a 10 year period, is a combined analytic and simulative technique. An analytic component is the Computer Aided Reliability Estimation capability, third generation, or simply CARE III. A simulative component is the Gate Logic Software Simulator capability, or GLOSS. The numerous factors that potentially have a degrading effect on system reliability and the ways in which these factors that are peculiar to highly reliable fault tolerant systems are accounted for in credible reliability assessments. Also presented are the modeling difficulties that result from their inclusion and the ways in which CARE III and GLOSS mitigate the intractability of the heretofore unworkable mathematics.

  3. PARAMЕTЕRS OF RЕLIABILITY OF ELECTRICAL POWЕR SUPPLY SYSTЕMS

    Directory of Open Access Journals (Sweden)

    Mr. Aleksandr A. Skripilev

    2016-09-01

    Full Text Available This article describes the theoretical basis of reliability of power supply system. It also provides qualitative and quantitative indicators of reliability, concepts and definitions, specific to the objects. The authors evaluate the impact of the interruption of еlеctricity supply on damage to consumers of еlеctricity. It is shown that the еffеctivеnеss of the country's еlеctricity depends on the reliability of power supply systems. The authors determine causes of unreliability of main and auxiliary еquipmеnt of centralized and autonomous power sources, which include aging and wear-prone components, difficulties of technological nature. The research shows ways to improve and enhance the reliability of еlеctricity in modern conditions. The authors identify the principles and means to ensure the reliability, rеprеsеnt universal methods of analysis and mеasurеmеnt of rеliability during the life cycle of еlеctrical systems based on reliability indicators, durability, reparability and pеrsistеncе of unit, taking into account their structuring.

  4. Using VIIRS Day/Night Band to Measure Electricity Supply Reliability: Preliminary Results from Maharashtra, India

    Directory of Open Access Journals (Sweden)

    Michael L. Mann

    2016-08-01

    Full Text Available Unreliable electricity supplies are common in developing countries and impose large socio-economic costs, yet precise information on electricity reliability is typically unavailable. This paper presents preliminary results from a machine-learning approach for using satellite imagery of nighttime lights to develop estimates of electricity reliability for western India at a finer spatial scale. We use data from the Visible Infrared Imaging Radiometer Suite (VIIRS onboard the Suomi National Polar Partnership (SNPP satellite together with newly-available data from networked household voltage meters. Our results point to the possibilities of this approach as well as areas for refinement. With currently available training data, we find a limited ability to detect individual outages identified by household-level measurements of electricity voltage. This is likely due to the relatively small number of individual outages observed in our preliminary data. However, we find that the approach can estimate electricity reliability rates for individual locations fairly well, with the predicted versus actual regression yielding an R2 > 0.5. We also find that, despite the after midnight overpass time of the SNPP satellite, the reliability estimates derived are representative of daytime reliability.

  5. Navigating financial and supply reliability tradeoffs in regional drought management portfolios

    Science.gov (United States)

    Zeff, Harrison B.; Kasprzyk, Joseph R.; Herman, Jonathan D.; Reed, Patrick M.; Characklis, Gregory W.

    2014-06-01

    Rising development costs and growing concerns over environmental impacts have led many communities to explore more diversified water management strategies. These "portfolio"-style approaches integrate existing supply infrastructure with other options such as conservation measures or water transfers. Diversified water supply portfolios have been shown to reduce the capacity and costs required to meet demand, while also providing greater adaptability to changing hydrologic conditions. However, this additional flexibility can also cause unexpected reductions in revenue (from conservation) or increased costs (from transfers). The resulting financial instability can act as a substantial disincentive to utilities seeking to implement more innovative water management techniques. This study seeks to design portfolios that employ financial tools (e.g., contingency funds and index insurance) to reduce fluctuations in revenues and costs, allowing these strategies to achieve improved performance without sacrificing financial stability. This analysis is applied to the development of coordinated regional supply portfolios in the "Research Triangle" region of North Carolina, an area comprising four rapidly growing municipalities. The actions of each independent utility become interconnected when shared infrastructure is utilized to enable interutility transfers, requiring the evaluation of regional tradeoffs in up to five performance and financial objectives. Diversified strategies introduce significant tradeoffs between achieving reliability goals and introducing burdensome variability in annual revenues and/or costs. Financial mitigation tools can mitigate the impacts of this variability, allowing for an alternative suite of improved solutions. This analysis provides a general template for utilities seeking to navigate the tradeoffs associated with more flexible, portfolio-style management approaches.

  6. Network reliability analysis of complex systems using a non-simulation-based method

    International Nuclear Information System (INIS)

    Kim, Youngsuk; Kang, Won-Hee

    2013-01-01

    Civil infrastructures such as transportation, water supply, sewers, telecommunications, and electrical and gas networks often establish highly complex networks, due to their multiple source and distribution nodes, complex topology, and functional interdependence between network components. To understand the reliability of such complex network system under catastrophic events such as earthquakes and to provide proper emergency management actions under such situation, efficient and accurate reliability analysis methods are necessary. In this paper, a non-simulation-based network reliability analysis method is developed based on the Recursive Decomposition Algorithm (RDA) for risk assessment of generic networks whose operation is defined by the connections of multiple initial and terminal node pairs. The proposed method has two separate decomposition processes for two logical functions, intersection and union, and combinations of these processes are used for the decomposition of any general system event with multiple node pairs. The proposed method is illustrated through numerical network examples with a variety of system definitions, and is applied to a benchmark gas transmission pipe network in Memphis TN to estimate the seismic performance and functional degradation of the network under a set of earthquake scenarios.

  7. System reliability developments in structural engineering

    International Nuclear Information System (INIS)

    Moses, F.

    1982-01-01

    Two major limitations occur in present structural design code developments utilizing reliability theory. The notional system reliabilities may differ significantly from calibrated component reliabilities. Secondly, actual failures are often due to gross errors not reflected in most present code formats. A review is presented of system reliability methods and further new concepts are developed. The incremental load approach for identifying and expressing collapse modes is expanded by employing a strategy to identify and enumerate the significant structural collapse modes. It further isolates the importance of critical components in the system performance. Ductile and brittle component behavior and strength correlation is reflected in the system model and illustrated in several examples. Modal combinations for the system reliability are also reviewed. From these developments a system factor can be addended to component safety checking equations. Values may be derived from system behavior by substituting in a damage model which accounts for the response range from component failure to collapse. Other strategies are discussed which emphasize quality assurance during design and in-service inspection for components whose behavior is critical to the system reliability. (Auth.)

  8. Reliability of electronic systems

    International Nuclear Information System (INIS)

    Roca, Jose L.

    2001-01-01

    Reliability techniques have been developed subsequently as a need of the diverse engineering disciplines, nevertheless they are not few those that think they have been work a lot on reliability before the same word was used in the current context. Military, space and nuclear industries were the first ones that have been involved in this topic, however not only in these environments it is that it has been carried out this small great revolution in benefit of the increase of the reliability figures of the products of those industries, but rather it has extended to the whole industry. The fact of the massive production, characteristic of the current industries, drove four decades ago, to the fall of the reliability of its products, on one hand, because the massively itself and, for other, to the recently discovered and even not stabilized industrial techniques. Industry should be changed according to those two new requirements, creating products of medium complexity and assuring an enough reliability appropriated to production costs and controls. Reliability began to be integral part of the manufactured product. Facing this philosophy, the book describes reliability techniques applied to electronics systems and provides a coherent and rigorous framework for these diverse activities providing a unifying scientific basis for the entire subject. It consists of eight chapters plus a lot of statistical tables and an extensive annotated bibliography. Chapters embrace the following topics: 1- Introduction to Reliability; 2- Basic Mathematical Concepts; 3- Catastrophic Failure Models; 4-Parametric Failure Models; 5- Systems Reliability; 6- Reliability in Design and Project; 7- Reliability Tests; 8- Software Reliability. This book is in Spanish language and has a potentially diverse audience as a text book from academic to industrial courses. (author)

  9. Problem of nuclear power plant reliability

    International Nuclear Information System (INIS)

    Popyrin, L.S.; Nefedov, Yu.V.

    1989-01-01

    The problem of substantiation of rational and methods of ensurance of NPP reliability at the stage of its designing has been studied. It is shown that the optimal level of NPP reliability is determined by coordinating solution of the proiblems for optimization of reliability of power industry, heat and power supply and nuclear power generation systems comprising NPP, and problems of reliability optimization of NPP proper, as a complex engineering system. The conclusion is made that the greatest attention should be paid to the development of mathematical models of reliability, taking into account different methods of equipment redundancy, as well as dependence of failures on barious factors, improvement of NPP reliability indices, development of data base, working out of the complec of consistent standards of reliability. 230 refs.; 2 figs.; 1 tab

  10. Improvement of Equipment reliability for Auxiliary Feed Water System

    Energy Technology Data Exchange (ETDEWEB)

    Deok, Lee Sang; Kwan, Lee Yong [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    According to AP913 ER) of INPO, Number of the event related to equipment is higher than others like external or human performance. In the top 25 systems, Auxiliary feed water system is the seventh highest among systems. AWFS consists of many component and complex system and Main Function of AFWS is to supply feedwater to the steam generators for the removal of heat from the RCS(Reactor Coolant System) in event the main feedwater system is unavailable following a transient or accident. Reliability of component means how well operate on demands and monitoring is necessary to keep track of condition of component. If component performance is lower than the required value, corrective action for failure mode should be done. The objective of this study is focused to improve of AF pump by adding the tasks of SHR(System Health Report) into the task of system engineer walkdown of PMT(Preventive Maintenance Template). Increasing the reliability of AF pump will contribute to improvement of reliability of AFWS. Based on operating history, there was high vibration of AF pump during performance test. In that case, there were a lot of maintenance works for normal operation of AF pump. Vibration problem related pump can't be detected by tasks of SE walkdown because it's not running during normal operation except for surveillance test. CHR(Component Health Report) of AF pump in AFWS can be made from necessary part which means monitoring and functional failure because problem of Stand-by pump can be covered by conducting monitoring and analysis of functional failure. To improve reliability of AF pump, walkdown of PMT and SHR should be conducted both in accordance with surveillance test frequency. Health of AF pump based on operation history can be verified first and then can find out which parts of pump are weak. Finally, weak part can be managed intensively and failure can be reduced according to SE walkdown. But this work can be risky and burdensome because all parts of

  11. System design of the traction power supply for the high-speed line Beijing - Tianjin

    Energy Technology Data Exchange (ETDEWEB)

    Altmann, Martin; Fischer, Andreas; Tornow, Torsten [Siemens AG, Erlangen (Germany)

    2011-11-15

    The high-speed line Beijing - Tianjin connecting the Capital Beijing with the harbour city Tianjin is the first high-speed line in China dedicated only to passenger traffic and is operated at 300 km/h. The commercial service started in due time for the Olympic games in 2008. For the system design and a reliable traction power supply the simulation software Sitras {sup registered} Sidytrac was used. The program incorporates all modules necessary for the overall system design and relating detailed investigations. Measurements during system integration test validated the simulation results. (orig.)

  12. Geothermal heat-pump systems of heat supply

    International Nuclear Information System (INIS)

    Vasil'ev, G.P.

    2004-01-01

    The data on the multilayer operation of the objects, located in the climatic conditions of the central area of Russia and equipped with the geothermal heat-pumping systems of the heat supply are presented. The results of the analytical studies on evaluating the geothermal heat-pumping systems of the heat supply integration efficiency into the structure of the energy supply system, prevailing in the country, are presented [ru

  13. Supply reliability and dynamic safety analysis of an alternative energy supply chain

    DEFF Research Database (Denmark)

    Herbert-Hansen, Zaza Nadja Lee; Markert, Frank; Jacobsen, Peter

    2016-01-01

    This paper focuses on the integration of risk and supply chain modelling by means of analysing a case concerning a Hydrogen Refuelling Station in Berlin. It presents a framework that can analyse an energy supply chain and at the same time enables easy reporting and presentation of various results...... by utilizing Dis-crete Event Simulation (DES). The industrial implication of this work is to provide practitioners with an anal-ysis framework for improved decision support. The novelty of this paper is the approach to model a supply chain together with a dynamically modelled event tree-based approach...

  14. Exploitation examination of reliability of coal dust systems

    International Nuclear Information System (INIS)

    Dojchinovski, Ilija; Trajkovski, Kole

    1997-01-01

    Designers and operators wish is, long, failure free operation at designed parameters of every system. Always we know the system start up time, but we don't know how long this system will operate successfully. Because of that in this article is given a method how, step by step, to determine the reliability of the system. Reliability parameters are obtained from experimental and operational data. When reliability parameters are determined then it is very easy to compare reliability of similar systems, for example excavators, or different systems, such as truck and rubber band transport system. Practical use of the theory of reliability is by purchasing of the systems when manufacturers have to have and present reliability parameters and on this way we can decide which system satisfies our needs regarding the quality-price-reliability. Reliability can be practically used in system operation where: 1) system reliability is maintained with proper start, use and shutdown of the system; 2) a system reliability is maintained with good maintenance organization; 3) a system reliability is maintained with innovations and improvements with final purpose removing of the imperfections experienced through the operation. Reliability is very important parameter in power generation plants. (Author)

  15. Comprehensive automation and monitoring of MV grids as the key element of improvement of energy supply reliability and continuity

    Directory of Open Access Journals (Sweden)

    Stanisław Kubacki

    2012-03-01

    Full Text Available The paper presents the issue of comprehensive automation and monitoring of medium voltage (MV grids as a key element of the Smart Grid concept. The existing condition of MV grid control and monitoring is discussed, and the concept of a solution which will provide the possibility of remote automatic grid reconfiguration and ensure full grid observability from the dispatching system level is introduced. Automation of MV grid switching is discussed in detail to isolate a faulty line section and supply electricity at the time of the failure to the largest possible number of recipients. An example of such automation controls’ operation is also presented. The paper’s second part presents the key role of the quick fault location function and the possibility of the MV grid’s remote reconfiguration for improving power supply reliability (SAIDI and SAIFI indices. It is also shown how an increase in the number of points fitted with faulted circuit indicators with the option of remote control of switches from the dispatch system in MV grids may affect reduction of SAIDI and SAIFI indices across ENERGA-OPERATOR SA divisions.

  16. ANALYSIS OF RELIABILITY OF RESERVED AUTOMATIC CONTROL SYSTEMS OF INDUSTRIAL POWER PROCESSES

    Directory of Open Access Journals (Sweden)

    V. A. Anishchenko

    2014-01-01

    Full Text Available This paper describes the comparative analysis of the main structural schemes for reserved automatic control and regulation devices of important objects of power supply with increased reliability requirements. There were analyzed schemes of passive and active doubling with control device, passive and active tripling, combined redundancy and majority redundancy according to schemes: “two from three” and “three from five”. On the results of calculations fulfilled there was made comparison of these schemes for ideal devices of built-in control and ideal majority elements. Scales of preferences of systems according to criterion of average time maximum and average probability of no-failure operation were built. These scales have variable character, depending on intervals in which there is a parameter obtained by multiplication of failure rate and time. The sequence of systems’ preferences is changing and is depending on each system failures and in moments of curves crossing of average probability of no-failure operation of systems. Analysis of calculation results showed the advantages of tripling systems and combined redundancy in reliability and this is achieved by a great amount of expenses for these systems creation. Under definite conditions the reliability of system of passive tripling is higher compared to system of active doubling. The majority schemes allow determining not only the full but also single (metrological failures. Boundary value of unreliability of built-in control device is determined, and this allows making a perfect choice between systems of active and passive redundancy.

  17. Supply reliability and dynamic safety analysis of an alternative energy supply chain

    DEFF Research Database (Denmark)

    Herbert-Hansen, Zaza Nadja Lee; Markert, Frank; Jacobsen, Peter

    2016-01-01

    This paper focuses on the integration of risk and supply chain modelling by means of analysing a case concerning a Hydrogen Refuelling Station in Berlin. It presents a framework that can analyse an energy supply chain and at the same time enables easy reporting and presentation of various results...

  18. PV Systems Reliability Final Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lavrova, Olga [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Flicker, Jack David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Johnson, Jay [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Armijo, Kenneth Miguel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gonzalez, Sigifredo [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Schindelholz, Eric John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorensen, Neil R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Yang, Benjamin Bing-Yeh [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-12-01

    The continued exponential growth of photovoltaic technologies paves a path to a solar-powered world, but requires continued progress toward low-cost, high-reliability, high-performance photovoltaic (PV) systems. High reliability is an essential element in achieving low-cost solar electricity by reducing operation and maintenance (O&M) costs and extending system lifetime and availability, but these attributes are difficult to verify at the time of installation. Utilities, financiers, homeowners, and planners are demanding this information in order to evaluate their financial risk as a prerequisite to large investments. Reliability research and development (R&D) is needed to build market confidence by improving product reliability and by improving predictions of system availability, O&M cost, and lifetime. This project is focused on understanding, predicting, and improving the reliability of PV systems. The two areas being pursued include PV arc-fault and ground fault issues, and inverter reliability.

  19. Advances in reliability and system engineering

    CERN Document Server

    Davim, J

    2017-01-01

    This book presents original studies describing the latest research and developments in the area of reliability and systems engineering. It helps the reader identifying gaps in the current knowledge and presents fruitful areas for further research in the field. Among others, this book covers reliability measures, reliability assessment of multi-state systems, optimization of multi-state systems, continuous multi-state systems, new computational techniques applied to multi-state systems and probabilistic and non-probabilistic safety assessment.

  20. The role of enterprise systems in supply chain networks: a taxonomy of supply chain strategies

    DEFF Research Database (Denmark)

    Møller, Charles

    2006-01-01

    in the supply chain and to choose the right supply chain strategy. The work is based on a comprehensive study of the Supply Chain Management (SCM) and Enterprise Resource Planning (ERP) literature and the study suggests that there is an emerging new research potential for Enterprise Systems (ES) in the supply......This paper proposes a taxonomy for supply chain integration strategies. The taxonomy is based on the contingencies of supply chain network coupling and the Extended Enterprise Systems (EES) architecture in the supply chain. The purpose of this model is to map the portfolio of relations...

  1. Reliability of large and complex systems

    CERN Document Server

    Kolowrocki, Krzysztof

    2014-01-01

    Reliability of Large and Complex Systems, previously titled Reliability of Large Systems, is an innovative guide to the current state and reliability of large and complex systems. In addition to revised and updated content on the complexity and safety of large and complex mechanisms, this new edition looks at the reliability of nanosystems, a key research topic in nanotechnology science. The author discusses the importance of safety investigation of critical infrastructures that have aged or have been exposed to varying operational conditions. This reference provides an asympt

  2. Assessment of system reliability for a stochastic-flow distribution network with the spoilage property

    Science.gov (United States)

    Lin, Yi-Kuei; Huang, Cheng-Fu; Yeh, Cheng-Ta

    2016-04-01

    In supply chain management, satisfying customer demand is the most concerned for the manager. However, the goods may rot or be spoilt during delivery owing to natural disasters, inclement weather, traffic accidents, collisions, and so on, such that the intact goods may not meet market demand. This paper concentrates on a stochastic-flow distribution network (SFDN), in which a node denotes a supplier, a transfer station, or a market, while a route denotes a carrier providing the delivery service for a pair of nodes. The available capacity of the carrier is stochastic because the capacity may be partially reserved by other customers. The addressed problem is to evaluate the system reliability, the probability that the SFDN can satisfy the market demand with the spoilage rate under the budget constraint from multiple suppliers to the customer. An algorithm is developed in terms of minimal paths to evaluate the system reliability along with a numerical example to illustrate the solution procedure. A practical case of fruit distribution is presented accordingly to emphasise the management implication of the system reliability.

  3. Space Vehicle Reliability Modeling in DIORAMA

    Energy Technology Data Exchange (ETDEWEB)

    Tornga, Shawn Robert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-07-12

    When modeling system performance of space based detection systems it is important to consider spacecraft reliability. As space vehicles age the components become prone to failure for a variety of reasons such as radiation damage. Additionally, some vehicles may lose the ability to maneuver once they exhaust fuel supplies. Typically failure is divided into two categories: engineering mistakes and technology surprise. This document will report on a method of simulating space vehicle reliability in the DIORAMA framework.

  4. Modeling integrated water user decisions in intermittent supply systems

    Science.gov (United States)

    Rosenberg, David E.; Tarawneh, Tarek; Abdel-Khaleq, Rania; Lund, Jay R.

    2007-07-01

    We apply systems analysis to estimate household water use in an intermittent supply system considering numerous interdependent water user behaviors. Some 39 household actions include conservation; improving local storage or water quality; and accessing sources having variable costs, availabilities, reliabilities, and qualities. A stochastic optimization program with recourse decisions identifies the infrastructure investments and short-term coping actions a customer can adopt to cost-effectively respond to a probability distribution of piped water availability. Monte Carlo simulations show effects for a population of customers. Model calibration reproduces the distribution of billed residential water use in Amman, Jordan. Parametric analyses suggest economic and demand responses to increased availability and alternative pricing. It also suggests potential market penetration for conservation actions, associated water savings, and subsidies to entice further adoption. We discuss new insights to size, target, and finance conservation.

  5. A global water supply reservoir yield model with uncertainty analysis

    International Nuclear Information System (INIS)

    Kuria, Faith W; Vogel, Richard M

    2014-01-01

    Understanding the reliability and uncertainty associated with water supply yields derived from surface water reservoirs is central for planning purposes. Using a global dataset of monthly river discharge, we introduce a generalized model for estimating the mean and variance of water supply yield, Y, expected from a reservoir for a prespecified reliability, R, and storage capacity, S assuming a flow record of length n. The generalized storage–reliability–yield (SRY) relationships reported here have numerous water resource applications ranging from preliminary water supply investigations, to economic and climate change impact assessments. An example indicates how our generalized SRY relationship can be combined with a hydroclimatic model to determine the impact of climate change on surface reservoir water supply yields. We also document that the variability of estimates of water supply yield are invariant to characteristics of the reservoir system, including its storage capacity and reliability. Standardized metrics of the variability of water supply yields are shown to depend only on the sample size of the inflows and the statistical characteristics of the inflow series. (paper)

  6. Forward reliability markets: Less risk, less market power, more efficiency

    International Nuclear Information System (INIS)

    Cramton, Peter; Stoft, Steven

    2008-01-01

    A forward reliability market is presented. The market coordinates new entry through the forward procurement of reliability options - physical capacity bundled with a financial option to supply energy above a strike price. The market assures adequate generating resources and prices capacity from the bids of competitive new entry in an annual auction. Efficient performance incentives are maintained from a load-following obligation to supply energy above the strike price. The capacity payment fully hedges load from high spot prices, and reduces supplier risk as well. Market power is reduced in the spot market, since suppliers enter the spot market with a nearly balanced position in times of scarcity. Market power in the reliability market is addressed by not allowing existing supply to impact the capacity price. The approach, which has been adopted in New England and Colombia, is readily adapted to either a thermal system or a hydro system. (author)

  7. Power system reliability memento; Memento de la surete du systeme electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The reliability memento of the French power system (national power transmission grid) is an educational document which purpose is to point out the role of each one as regards power system operating reliability. This memento was first published in 1999. Extensive changes have taken place since then. The new 2002 edition shows that system operating reliability is as an important subject as ever: 1 - foreword; 2 - system reliability: the basics; 3 - equipment measures taken in order to guarantee the reliability of the system; 4 - organisational and human measures taken to guarantee the reliability of the system; appendix 1 - system operation: basic concepts; appendix 2 - guiding principles governing the reliability of the power system; appendix 3 - international associations of transmission system operators; appendix 4 - description of major incidents.

  8. Reliability evaluation of power systems

    CERN Document Server

    Billinton, Roy

    1996-01-01

    The Second Edition of this well-received textbook presents over a decade of new research in power system reliability-while maintaining the general concept, structure, and style of the original volume. This edition features new chapters on the growing areas of Monte Carlo simulation and reliability economics. In addition, chapters cover the latest developments in techniques and their application to real problems. The text also explores the progress occurring in the structure, planning, and operation of real power systems due to changing ownership, regulation, and access. This work serves as a companion volume to Reliability Evaluation of Engineering Systems: Second Edition (1992).

  9. Integrated system reliability analysis

    DEFF Research Database (Denmark)

    Gintautas, Tomas; Sørensen, John Dalsgaard

    Specific targets: 1) The report shall describe the state of the art of reliability and risk-based assessment of wind turbine components. 2) Development of methodology for reliability and risk-based assessment of the wind turbine at system level. 3) Describe quantitative and qualitative measures...

  10. Power-supply system for high-voltage electron guns with grid control

    International Nuclear Information System (INIS)

    Grigorev, Y.V.

    1985-01-01

    A power-supply system for electron guns with grid control is described which consists of a source of accelerating voltage between 20 and 180 kV with a current of 100 mA and a control circuit for an electron gun that contains a pulse generator having an output voltage of up to 5 kV for pulse durations of 2, 10, 50 and 90 microseconds. The output pulses of the generator are synchronized with a certain phase of the cathode heater current of the gun, and they can be repeated at a frequency between 100 and 0.4 Hz. The system is reliable and resistant to the overloads associated with breakdowns in the gun

  11. Reliability Based Optimization of Structural Systems

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    1987-01-01

    The optimization problem to design structural systems such that the reliability is satisfactory during the whole lifetime of the structure is considered in this paper. Some of the quantities modelling the loads and the strength of the structure are modelled as random variables. The reliability...... is estimated using first. order reliability methods ( FORM ). The design problem is formulated as the optimization problem to minimize a given cost function such that the reliability of the single elements satisfies given requirements or such that the systems reliability satisfies a given requirement....... For these optimization problems it is described how a sensitivity analysis can be performed. Next, new optimization procedures to solve the optimization problems are presented. Two of these procedures solve the system reliability based optimization problem sequentially using quasi-analytical derivatives. Finally...

  12. Supply system with microprocessor control for electron gun

    International Nuclear Information System (INIS)

    Duplin, N.I.; Sergeev, N.N.

    1988-01-01

    Precision supply system for electron gun used in Auger-spectrometer is described. The supply system consists of control and high-voltage parts, made as separate units. Supply high-voltage unit includes system supply module, filament module to supply electron gun cathode and 6 high-volt modules to supply accelerating, modulating and three focusing electrodes of the gun. High-voltage modules have the following characteristics: U-(100-1000)V output voltage, 5x10 -5 U stability, 10 -5 xU pulsation amplitude, J-(0-5)A filament current change range at 10 -4 xJ stability. Control unit including microprocessor, timer and storage devices forms control voltage for all modules and regulates voltage and current of filament at electrodes

  13. Performance Analyses of Renewable and Fuel Power Supply Systems for Different Base Station Sites

    Directory of Open Access Journals (Sweden)

    Josip Lorincz

    2014-11-01

    Full Text Available Base station sites (BSSs powered with renewable energy sources have gained the attention of cellular operators during the last few years. This is because such “green” BSSs impose significant reductions in the operational expenditures (OPEX of telecom operators due to the possibility of on-site renewable energy harvesting. In this paper, the green BSSs power supply system parameters detected through remote and centralized real time sensing are presented. An implemented sensing system based on a wireless sensor network enables reliable collection and post-processing analyses of many parameters, such as: total charging/discharging current of power supply system, battery voltage and temperature, wind speed, etc. As an example, yearly sensing results for three different BSS configurations powered by solar and/or wind energy are discussed in terms of renewable energy supply (RES system performance. In the case of powering those BSS with standalone systems based on a fuel generator, the fuel consumption models expressing interdependence among the generator load and fuel consumption are proposed. This has allowed energy-efficiency comparison of the fuel powered and RES systems, which is presented in terms of the OPEX and carbon dioxide (CO2 reductions. Additionally, approaches based on different BSS air-conditioning systems and the on/off regulation of a daily fuel generator activity are proposed and validated in terms of energy and capital expenditure (CAPEX savings.

  14. System reliability of corroding pipelines

    International Nuclear Information System (INIS)

    Zhou Wenxing

    2010-01-01

    A methodology is presented in this paper to evaluate the time-dependent system reliability of a pipeline segment that contains multiple active corrosion defects and is subjected to stochastic internal pressure loading. The pipeline segment is modeled as a series system with three distinctive failure modes due to corrosion, namely small leak, large leak and rupture. The internal pressure is characterized as a simple discrete stochastic process that consists of a sequence of independent and identically distributed random variables each acting over a period of one year. The magnitude of a given sequence follows the annual maximum pressure distribution. The methodology is illustrated through a hypothetical example. Furthermore, the impact of the spatial variability of the pressure loading and pipe resistances associated with different defects on the system reliability is investigated. The analysis results suggest that the spatial variability of pipe properties has a negligible impact on the system reliability. On the other hand, the spatial variability of the internal pressure, initial defect sizes and defect growth rates can have a significant impact on the system reliability.

  15. Power system reliability analysis using fault trees

    International Nuclear Information System (INIS)

    Volkanovski, A.; Cepin, M.; Mavko, B.

    2006-01-01

    The power system reliability analysis method is developed from the aspect of reliable delivery of electrical energy to customers. The method is developed based on the fault tree analysis, which is widely applied in the Probabilistic Safety Assessment (PSA). The method is adapted for the power system reliability analysis. The method is developed in a way that only the basic reliability parameters of the analysed power system are necessary as an input for the calculation of reliability indices of the system. The modeling and analysis was performed on an example power system consisting of eight substations. The results include the level of reliability of current power system configuration, the combinations of component failures resulting in a failed power delivery to loads, and the importance factors for components and subsystems. (author)

  16. Hot weather stresses system : more supply needed

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2002-08-01

    Signs of stress in Ontario's electric system were revealed this summer, mainly as a result of the hot and humid weather experienced in the Toronto region in particular. A question was raised by the Executive Director of the Independent Power Producers' Society of Ontario (IPPSO) as to whether there are enough incentives for new supply or any unnecessary barriers, in light of the tight reserve margins and little new construction. No major failures or breakdowns were experienced, which proved to be a real test of the newly created market system. However, significant spikes in hourly prices and uplift charges were felt in July. At times, power had to be purchased from outside the province, and the prices paid for this power were much higher than the prices paid to in-province producers. There was proof that consumers were not adjusting their consumption in response to fluctuations in the prices, as had been expected by the system's designers. Pre-dispatch and real-time prices were disconnected, and large consumers did not benefit from reliable day-ahead price projections. Another major issue raised was that of finding new power supplies. The situation is not yet desperate as Ontario can trade electricity with other regions, but it is felt that the situation should be examined sooner rather than later. Import pricing is an issue that needs to be addressed now. The IPPSO is concerned that no new generating capacity plans are in the works at this time. The barriers to new investment in Ontario's generation must be identified, and a meeting between market participants and government should be scheduled for that purpose. A review of the presentation of price-related information is being conducted to allow consumers to adjust their consumption, cutting back when prices soar and saving money by the same token. It is felt that a more comfortable surplus of supply would either reduce or eliminate these problems. Some of the reasons believed to affect the

  17. Hot weather stresses system : more supply needed

    International Nuclear Information System (INIS)

    Anon

    2002-01-01

    Signs of stress in Ontario's electric system were revealed this summer, mainly as a result of the hot and humid weather experienced in the Toronto region in particular. A question was raised by the Executive Director of the Independent Power Producers' Society of Ontario (IPPSO) as to whether there are enough incentives for new supply or any unnecessary barriers, in light of the tight reserve margins and little new construction. No major failures or breakdowns were experienced, which proved to be a real test of the newly created market system. However, significant spikes in hourly prices and uplift charges were felt in July. At times, power had to be purchased from outside the province, and the prices paid for this power were much higher than the prices paid to in-province producers. There was proof that consumers were not adjusting their consumption in response to fluctuations in the prices, as had been expected by the system's designers. Pre-dispatch and real-time prices were disconnected, and large consumers did not benefit from reliable day-ahead price projections. Another major issue raised was that of finding new power supplies. The situation is not yet desperate as Ontario can trade electricity with other regions, but it is felt that the situation should be examined sooner rather than later. Import pricing is an issue that needs to be addressed now. The IPPSO is concerned that no new generating capacity plans are in the works at this time. The barriers to new investment in Ontario's generation must be identified, and a meeting between market participants and government should be scheduled for that purpose. A review of the presentation of price-related information is being conducted to allow consumers to adjust their consumption, cutting back when prices soar and saving money by the same token. It is felt that a more comfortable surplus of supply would either reduce or eliminate these problems. Some of the reasons believed to affect the level of investment in

  18. Intelligent power supply controller

    International Nuclear Information System (INIS)

    Rumrill, R.S.; Reinagel, D.J.

    1991-01-01

    The authors have developed a new power supply controller which would combine 20-bit precision, simple interfacing, and versatile software control. It performs many tasks internal to the power supply and also communicates with an external host computer. Parameters can be entered and/or read over a serial link using one of the 82 command words. In addition, an optional remote control panel can be located up to thousands of feet away. This new controller will reduce the software development time normally spent by the user, while increasing the reliability of the system. The cost is less than buying the equivalent separate CAMAC system. Nonvolatile memory remembers all configuration data; one generic controller can thus be programmed to use anywhere from the smallest power supply to the largest. The controllers will be used at the Clinton P. Anderson Meson Facility at Los Alamos

  19. Study on intermediate frequency power supply automatic monitor system

    International Nuclear Information System (INIS)

    Wang Yuntong; Xu Bin

    2007-06-01

    A new design project of the automatic monitor system for the intermediate frequency power supply system by using the communication server is put for- ward and the realizing principle method and the key technique are clarified in detail. This system made use of the conversion function with the series communication server's control, realized the data collecting function by the double machine backup and redundancy. The new network system adopted the photoelectric-insulated-communication connect device and the diagnosis technique, increased the anti-interference ability, the communication adopted the technique by the alarm information sending out in first and circularly repeating, the slowly speed is overcame in the original monitor network system, and strengthened the celerity of the monitor system and the reliability of the alarm report. After the new monitor system running, the result shows that the functions is more perfect than the original monitor system, the usage is more convenient, have the higher and dependable stability, the report of alarm is more quickly, and is convenient for the analysis after the trouble, at the same time, the system still have the strong ability and value to expand. (authors)

  20. Power Industry Reliability Coordination in Asia in a Market Environment

    OpenAIRE

    Hammons, Thomas J.; Voropai, Nikolai I.

    2010-01-01

    This paper addresses the problems of power supply reliability in a market environment. The specific features of economic interrelations between the power supply organization and consumers in terms of reliability assurance are examined and the principles of providing power supply reliability are formulated. The economic mechanisms of coordinating the interests of power supply organization and consumers to provide power supply reliability are discussed. Reliability of restructuring China's powe...

  1. Reliability-Based Optimization of Series Systems of Parallel Systems

    DEFF Research Database (Denmark)

    Enevoldsen, I.; Sørensen, John Dalsgaard

    Reliability-based design of structural systems is considered. Especially systems where the reliability model is a series system of parallel systems are analysed. A sensitivity analysis for this class of problems is presented. Direct and sequential optimization procedures to solve the optimization...

  2. System Reliability Analysis Considering Correlation of Performances

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Saekyeol; Lee, Tae Hee [Hanyang Univ., Seoul (Korea, Republic of); Lim, Woochul [Mando Corporation, Seongnam (Korea, Republic of)

    2017-04-15

    Reliability analysis of a mechanical system has been developed in order to consider the uncertainties in the product design that may occur from the tolerance of design variables, uncertainties of noise, environmental factors, and material properties. In most of the previous studies, the reliability was calculated independently for each performance of the system. However, the conventional methods cannot consider the correlation between the performances of the system that may lead to a difference between the reliability of the entire system and the reliability of the individual performance. In this paper, the joint probability density function (PDF) of the performances is modeled using a copula which takes into account the correlation between performances of the system. The system reliability is proposed as the integral of joint PDF of performances and is compared with the individual reliability of each performance by mathematical examples and two-bar truss example.

  3. System Reliability Analysis Considering Correlation of Performances

    International Nuclear Information System (INIS)

    Kim, Saekyeol; Lee, Tae Hee; Lim, Woochul

    2017-01-01

    Reliability analysis of a mechanical system has been developed in order to consider the uncertainties in the product design that may occur from the tolerance of design variables, uncertainties of noise, environmental factors, and material properties. In most of the previous studies, the reliability was calculated independently for each performance of the system. However, the conventional methods cannot consider the correlation between the performances of the system that may lead to a difference between the reliability of the entire system and the reliability of the individual performance. In this paper, the joint probability density function (PDF) of the performances is modeled using a copula which takes into account the correlation between performances of the system. The system reliability is proposed as the integral of joint PDF of performances and is compared with the individual reliability of each performance by mathematical examples and two-bar truss example.

  4. 76 FR 42534 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits; System...

    Science.gov (United States)

    2011-07-19

    ... Reliability Operating Limits; System Restoration Reliability Standards AGENCY: Federal Energy Regulatory... data necessary to analyze and monitor Interconnection Reliability Operating Limits (IROL) within its... Interconnection Reliability Operating Limits, Order No. 748, 134 FERC ] 61,213 (2011). \\2\\ The term ``Wide-Area...

  5. ANFIS-based modelling for photovoltaic power supply system: A case study

    Energy Technology Data Exchange (ETDEWEB)

    Mellit, Adel [Faculty of Sciences and Technology, Department of Electronics, LAMEL, Jijel University, Ouled-Aissa, P.O. Box 98, Jijel 18000 (Algeria); Kalogirou, Soteris A. [Department of Mechanical Engineering and Materials Science and Engineering, Cyprus University of Technology, P.O. Box 50329, Limassol 3603 (Cyprus)

    2011-01-15

    Due to the various seasonal, monthly and daily changes in meteorological data, it is relatively difficult to find a suitable model for Photovoltaic power supply (PVPS) system. This paper deals with the modelling and simulation of a PVPS system using an Adaptive Neuro-Fuzzy Inference Scheme (ANFIS) and the proposition of a new expert configuration PVPS system. For the modelling of the PVPS system, it is required to find suitable models for its different components (ANFIS PV generator, ANFIS battery and ANFIS regulator) that could give satisfactory results under variable climatic conditions in order to test its performance and reliability. A database of measured climate data (global radiation, temperature and humidity) and electrical data (photovoltaic, battery and regulator voltage and current) of a PVPS system installed in Tahifet (south of Algeria) has been recorded for the period from 1992 to 1997. These data have been used for the modelling and simulation of the PVPS system. The results indicated that the reliability and the accuracy of the simulated system are excellent and the correlation coefficient between measured values and those estimated by the ANFIS gave a good prediction accuracy of 98%. Additionally, test results show that the ANFIS performed better than the Artificial Neural Network (ANN), which has also being tried to model the system. In addition, a new configuration of an expert PVPS system is proposed in this work. The predicted electrical data by the ANFIS model can be used for several applications in PV systems. (author)

  6. Power System Reliability Assessment by Analysing Voltage Dips on the Blue Horizon Bay 22KV Overhead Line in the Nelson Mandela Bay Municipality

    Science.gov (United States)

    Lamour, B. G.; Harris, R. T.; Roberts, A. G.

    2010-06-01

    Power system reliability problems are very difficult to solve because the power systems are complex and geographically widely distributed and influenced by numerous unexpected events. It is therefore imperative to employ the most efficient optimization methods in solving the problems relating to reliability of the power system. This paper presents a reliability analysis and study of the power interruptions resulting from severe power outages in the Nelson Mandela Bay Municipality (NMBM), South Africa and includes an overview of the important factors influencing reliability, and methods to improve the reliability. The Blue Horizon Bay 22 kV overhead line, supplying a 6.6 kV residential sector has been selected. It has been established that 70% of the outages, recorded at the source, originate on this feeder.

  7. Reliable energy supply. The new measuring of the world; Energiesicherheit. Die neue Vermessung der Welt

    Energy Technology Data Exchange (ETDEWEB)

    Mueller-Kraenner, S.

    2007-07-01

    The author presents a convincing final speech for a cooperative energy policy in an European frame, which supplies our economy with energy from different sources: payable, nonpolluting, reliable. The main topics are: what is reliability of energy supply; new measuring of the world during exploitation of new energy resources; energy superpower Russia; way up of Asia; common European energy policy; the defence of the last paradise's; ways out of dependency - sun or atom; the power of right and the diplomacy of the future. (GL) [German] Beim Run auf die letzten Energieressourcen wird derzeit die Welt neu vermessen. Die internationalen Machtverhaeltnisse verschieben sich entlang der Frage, wer die Ressourcen und den Zugang zum Weltmarkt kontrolliert. Das neue Sorgenkind der Weltgemeinschaft heisst Energiesicherheit. Der Begriff meint nicht nur die sichere und bezahlbare Versorgung mit Energie, sondern eine Politik, die im Kampf um Rohstoffe nicht neue Konflikte schafft und die Umwelt schaedigt. Was bedeutet es, wenn Russland die neue Erdgaspipeline durch die Ostsee fuehren will, ueber Meeresboden, in dem die Giftgasgranaten zweier Weltkriege liegen? Gibt es eine Alternative zu der gefaehrlichen Grossmachtpolitik, die Laender wie China, die USA und Russland derzeit verfolgen? Als Antwort auf die weltweite Energiekrise plaediert Mueller-Kraenner fuer eine kooperative Energiepolitik im europaeischen Rahmen, die unsere Wirtschaft mit Energie aus unterschiedlichen Quellen versorgt: bezahlbar, umweltfreundlich, sicher. (orig.)

  8. Accelerator-control-system interface for intelligent power supplies

    International Nuclear Information System (INIS)

    Cohen, S.

    1992-01-01

    A number of high-current high-precision magnet power supplies have been installed at the proton storage ring at the Los Alamos National Laboratory Accelerator Complex. The units replace existing supplies, powering large dipole magnets in the ring. These bending magnets require a high-current supply that is precise and stable. The control and interface design for these power supplies represents a departure from all others on-site. The supplies have sophisticated microprocessor control on-board and communicate with the accelerator control system via RS-422 (serial communications). The units, built by Alpha Scientific Electronics, Hayward, CA use a high-level ASCII control protocol. The low-level ''front-end'' software used by the accelerator control system has been written to accommodate these new devices. They communicate with the control system through a terminal server port connected to the site-wide ethernet backbone. Details of the software implementation for the analog and digital control of the supplies through the accelerator control system will be presented

  9. Reliability models for Space Station power system

    Science.gov (United States)

    Singh, C.; Patton, A. D.; Kim, Y.; Wagner, H.

    1987-01-01

    This paper presents a methodology for the reliability evaluation of Space Station power system. The two options considered are the photovoltaic system and the solar dynamic system. Reliability models for both of these options are described along with the methodology for calculating the reliability indices.

  10. Electricity supply. Older plants' impact on reliability and air quality

    International Nuclear Information System (INIS)

    England-Joseph, Judy A.; Adams, Charles M.; Wood, David G.; Feehan, Daniel J.; Veal, Howard F.; Skeen, John H. III; Koenigs, Melvin J.; Lichtenfeld, David I.; Seretakis, Pauline J.

    1990-09-01

    Life extension of fossil fuel plants is a relatively recent phenomenon; thus, utilities have little experience to demonstrate the longer-term operating reliability of plants with an extended service life. While utility industry officials and government and industry studies express optimism that these plants will continue to operate reliably, the officials and the studies also caution that it is too soon to determine how pursuing life extension will affect the reliability of the nation's electricity supply. According to DOE, the number of fossil fuel generating units' 30 years old or older is expected to increase from about 2,500 in 1989 to roughly 3,700 in 1998, increasing such plants' share of overall generating capacity from 13 percent in 1989 to 27 percent in 1998. EPA estimates that with existing air quality requirements, fossil fuel plant emissions will increase steadily during the coming decade. Proposed acid rain control legislation, which would affect many plants that may have their service life extended, would require utilities to significantly reduce emissions by the year 2000 but would allow utilities flexibility in deciding how and where to achieve the reductions. If such legislation is enacted, utilities generally are expected to find reducing emissions from existing plants more cost-effective than replacing them and to continue extending plants' service life. Officials of DOE and utility organizations expressed concern, however, that EPA could decide, as it did for one plant in 1988, that alterations made in extending the service life of plants exempted from the Clean Air Act would result in increased emissions and thus cause the altered plants to lose their exemption. According to the officials, the additional costs of achieving the Clean Air Act's standards could discourage some life extension projects. However, such decisions by EPA could also reduce the nation's total power plant emissions by eliminating an existing incentive to retain exempt

  11. System Dynamics Modeling for Supply Chain Information Sharing

    Science.gov (United States)

    Feng, Yang

    In this paper, we try to use the method of system dynamics to model supply chain information sharing. Firstly, we determine the model boundaries, establish system dynamics model of supply chain before information sharing, analyze the model's simulation results under different changed parameters and suggest improvement proposal. Then, we establish system dynamics model of supply chain information sharing and make comparison and analysis on the two model's simulation results, to show the importance of information sharing in supply chain management. We wish that all these simulations would provide scientific supports for enterprise decision-making.

  12. Reliable actuators for twin rotor MIMO system

    Science.gov (United States)

    Rao, Vidya S.; V. I, George; Kamath, Surekha; Shreesha, C.

    2017-11-01

    Twin Rotor MIMO System (TRMS) is a bench mark system to test flight control algorithms. One of the perturbations on TRMS which is likely to affect the control system is actuator failure. Therefore, there is a need for a reliable control system, which includes H infinity controller along with redundant actuators. Reliable control refers to the design of a control system to tolerate failures of a certain set of actuators or sensors while retaining desired control system properties. Output of reliable controller has to be transferred to the redundant actuator effectively to make the TRMS reliable even under actual actuator failure.

  13. RELIABILITY ANALYSIS OF POWER DISTRIBUTION SYSTEMS

    Directory of Open Access Journals (Sweden)

    Popescu V.S.

    2012-04-01

    Full Text Available Power distribution systems are basic parts of power systems and reliability of these systems at present is a key issue for power engineering development and requires special attention. Operation of distribution systems is accompanied by a number of factors that produce random data a large number of unplanned interruptions. Research has shown that the predominant factors that have a significant influence on the reliability of distribution systems are: weather conditions (39.7%, defects in equipment(25% and unknown random factors (20.1%. In the article is studied the influence of random behavior and are presented estimations of reliability of predominantly rural electrical distribution systems.

  14. The Concept of Autonomous Power Supply System Fed with Renewable Energy Sources

    Directory of Open Access Journals (Sweden)

    Waldemar Fedak

    2017-12-01

    Full Text Available Sustainable economic development requires the use of renewable energy sources in a rational and thoughtful way. In Polish conditions the use of several types of renewable energy sources on a single setup is a new issue. In particular, hybrid devices in conjunction with intelligent energy systems, such as lighting systems are generally not used. Therefore, the Polish energy production still relies on the burning of coal. Despite their advantages, renewable energy sources are characterized by seasonality and considerable instability. Access to renewable energy varies daily and seasonally, hence activities promoting the use of autonomous, hybrid power systems must be intensified. The presented research aims at the development of the Autonomous Power Supply (APS system based on the so-called energy mix. Such a system works in an isolated arrangement and serves to reliably supply electricity from renewable sources for small residential or public utility devices in an urban area. Systems with up to 3 kW power consist of modules, whose modular design allows the combination of various power configurations and types of renewable energy used. The basic system consists of a primary power source, additional power source, emergency power source, energy storage device, weather station and controller. The energy mix depends on the geographical location of the system. The emergency source can be implemented as an on-grid connector or fuel power generator with the participation of 100% until the primary or accessory power source failure is removed. The energy storage system consists of batteries or supercapacitors. The proposed system can be combined to create a local network that automatically responds to energy shortages in various network nodes by adjusting the supply of electricity within the network depending on its needs. For Poland realistic solutions in this article are the new and modern answer to these requirements.

  15. Towards Reliable Integrated Services for Dependable Systems

    DEFF Research Database (Denmark)

    Schiøler, Henrik; Ravn, Anders Peter; Izadi-Zamanabadi, Roozbeh

    Reliability issues for various technical systems are discussed and focus is directed towards distributed systems, where communication facilities are vital to maintain system functionality. Reliability in communication subsystems is considered as a resource to be shared among a number of logical c...... applications residing on alternative routes. Details are provided for the operation of RRRSVP based on reliability slack calculus. Conclusions summarize the considerations and give directions for future research....... connections and a reliability management framework is suggested. We suggest a network layer level reliability management protocol RRSVP (Reliability Resource Reservation Protocol) as a counterpart of the RSVP for bandwidth and time resource management. Active and passive standby redundancy by background...

  16. Towards Reliable Integrated Services for Dependable Systems

    DEFF Research Database (Denmark)

    Schiøler, Henrik; Ravn, Anders Peter; Izadi-Zamanabadi, Roozbeh

    2003-01-01

    Reliability issues for various technical systems are discussed and focus is directed towards distributed systems, where communication facilities are vital to maintain system functionality. Reliability in communication subsystems is considered as a resource to be shared among a number of logical c...... applications residing on alternative routes. Details are provided for the operation of RRRSVP based on reliability slack calculus. Conclusions summarize the considerations and give directions for future research....... connections and a reliability management framework is suggested. We suggest a network layer level reliability management protocol RRSVP (Reliability Resource Reservation Protocol) as a counterpart of the RSVP for bandwidth and time resource management. Active and passive standby redundancy by background...

  17. Evaluation of the Influence of the Logistic Operations Reliability on the Total Costs of a Supply Chain

    Directory of Open Access Journals (Sweden)

    Lukinskiy Valery

    2016-12-01

    Full Text Available Nowadays in logistics integral processes between the material and related flows in supply chains are getting developed more and more. However, in spite of increasing volume of statistical data which reflect the integral processes, the influence evaluation issues of the logistic operations reliability indexes on the total logistics costs remain open and require the corresponding researches implementation.

  18. On Bayesian System Reliability Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen Ringi, M

    1995-05-01

    The view taken in this thesis is that reliability, the probability that a system will perform a required function for a stated period of time, depends on a person`s state of knowledge. Reliability changes as this state of knowledge changes, i.e. when new relevant information becomes available. Most existing models for system reliability prediction are developed in a classical framework of probability theory and they overlook some information that is always present. Probability is just an analytical tool to handle uncertainty, based on judgement and subjective opinions. It is argued that the Bayesian approach gives a much more comprehensive understanding of the foundations of probability than the so called frequentistic school. A new model for system reliability prediction is given in two papers. The model encloses the fact that component failures are dependent because of a shared operational environment. The suggested model also naturally permits learning from failure data of similar components in non identical environments. 85 refs.

  19. On Bayesian System Reliability Analysis

    International Nuclear Information System (INIS)

    Soerensen Ringi, M.

    1995-01-01

    The view taken in this thesis is that reliability, the probability that a system will perform a required function for a stated period of time, depends on a person's state of knowledge. Reliability changes as this state of knowledge changes, i.e. when new relevant information becomes available. Most existing models for system reliability prediction are developed in a classical framework of probability theory and they overlook some information that is always present. Probability is just an analytical tool to handle uncertainty, based on judgement and subjective opinions. It is argued that the Bayesian approach gives a much more comprehensive understanding of the foundations of probability than the so called frequentistic school. A new model for system reliability prediction is given in two papers. The model encloses the fact that component failures are dependent because of a shared operational environment. The suggested model also naturally permits learning from failure data of similar components in non identical environments. 85 refs

  20. Modeling sustainability in renewable energy supply chain systems

    Science.gov (United States)

    Xie, Fei

    This dissertation aims at modeling sustainability of renewable fuel supply chain systems against emerging challenges. In particular, the dissertation focuses on the biofuel supply chain system design, and manages to develop advanced modeling framework and corresponding solution methods in tackling challenges in sustaining biofuel supply chain systems. These challenges include: (1) to integrate "environmental thinking" into the long-term biofuel supply chain planning; (2) to adopt multimodal transportation to mitigate seasonality in biofuel supply chain operations; (3) to provide strategies in hedging against uncertainty from conversion technology; and (4) to develop methodologies in long-term sequential planning of the biofuel supply chain under uncertainties. All models are mixed integer programs, which also involves multi-objective programming method and two-stage/multistage stochastic programming methods. In particular for the long-term sequential planning under uncertainties, to reduce the computational challenges due to the exponential expansion of the scenario tree, I also developed efficient ND-Max method which is more efficient than CPLEX and Nested Decomposition method. Through result analysis of four independent studies, it is found that the proposed modeling frameworks can effectively improve the economic performance, enhance environmental benefits and reduce risks due to systems uncertainties for the biofuel supply chain systems.

  1. Protective and control relays as coal-mine power-supply ACS subsystem

    Science.gov (United States)

    Kostin, V. N.; Minakova, T. E.

    2017-10-01

    The paper presents instantaneous selective short-circuit protection for the cabling of the underground part of a coal mine and central control algorithms as a Coal-Mine Power-Supply ACS Subsystem. In order to improve the reliability of electricity supply and reduce the mining equipment down-time, a dual channel relay protection and central control system is proposed as a subsystem of the coal-mine power-supply automated control system (PS ACS).

  2. Component reliability for electronic systems

    CERN Document Server

    Bajenescu, Titu-Marius I

    2010-01-01

    The main reason for the premature breakdown of today's electronic products (computers, cars, tools, appliances, etc.) is the failure of the components used to build these products. Today professionals are looking for effective ways to minimize the degradation of electronic components to help ensure longer-lasting, more technically sound products and systems. This practical book offers engineers specific guidance on how to design more reliable components and build more reliable electronic systems. Professionals learn how to optimize a virtual component prototype, accurately monitor product reliability during the entire production process, and add the burn-in and selection procedures that are the most appropriate for the intended applications. Moreover, the book helps system designers ensure that all components are correctly applied, margins are adequate, wear-out failure modes are prevented during the expected duration of life, and system interfaces cannot lead to failure.

  3. Working Group summary reports from the Advanced Photon Source reliability workshop

    International Nuclear Information System (INIS)

    1992-05-01

    A workshop was held at APS to address reliability goals for accelerator systems. Seventy-one individuals participated in the workshop, including 30 from other institutions. The goals of the workshop were to: (1) Give attendees an introduction to the basic concepts of reliability analysis. (2) Exchange information on operating experience at existing accelerator facilities and strategies for achieving reliability at facilities under design or in construction. (3) Discuss reliability goals for APS and the means of their achievement. This report contains the working group summary report an APS's following systems: RF Systems; Power Supplies; Magnet Systems; Interlock and Diagnostics; and Vacuum Systems

  4. Energy costs and Portland water supply system

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, W.M.; Hawley, R.P.

    1981-10-01

    The changing role of electrical energy on the Portland, Oregon, municipal-water-supply system is presented. Portland's actions in energy conservation include improved operating procedures, pump modifications, and modifications to the water system to eliminate pumping. Portland is implementing a small hydroelectric project at existing water-supply dams to produce an additional source of power for the area. Special precautions in construction and operation are necessary to protect the high quality of the water supply. 2 references, 7 figures.

  5. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  6. Systems thinking benefits in supply change management:an illustration of the viable systems model in a supply chain

    OpenAIRE

    Chronéer, Diana; Mirijamdotter, Anita

    2009-01-01

    Existing product development models are solely an organisational matter. They do not take into consideration the whole supply chain and its different actors. We investigate in this paper how Supply Chain Management (SCM) and Viable System Model (VSM) can support and create an effective use of information in product development and hence identify critical linkages in the supply chain. The aim is to introduce VSM as a framework that enable an analysis of company's supply chains and visualize vi...

  7. Aviation Fuel System Reliability and Fail-Safety Analysis. Promising Alternative Ways for Improving the Fuel System Reliability

    Directory of Open Access Journals (Sweden)

    I. S. Shumilov

    2017-01-01

    Full Text Available The paper deals with design requirements for an aviation fuel system (AFS, AFS basic design requirements, reliability, and design precautions to avoid AFS failure. Compares the reliability and fail-safety of AFS and aircraft hydraulic system (AHS, considers the promising alternative ways to raise reliability of fuel systems, as well as elaborates recommendations to improve reliability of the pipeline system components and pipeline systems, in general, based on the selection of design solutions.It is extremely advisable to design the AFS and AHS in accordance with Aviation Regulations АП25 and Accident Prevention Guidelines, ICAO (International Civil Aviation Association, which will reduce risk of emergency situations, and in some cases even avoid heavy disasters.ATS and AHS designs should be based on the uniform principles to ensure the highest reliability and safety. However, currently, this principle is not enough kept, and AFS looses in reliability and fail-safety as compared with AHS. When there are the examined failures (single and their combinations the guidelines to ensure the AFS efficiency should be the same as those of norm-adopted in the Regulations АП25 for AHS. This will significantly increase reliability and fail-safety of the fuel systems and aircraft flights, in general, despite a slight increase in AFS mass.The proposed improvements through the use of components redundancy of the fuel system will greatly raise reliability of the fuel system of a passenger aircraft, which will, without serious consequences for the flight, withstand up to 2 failures, its reliability and fail-safety design will be similar to those of the AHS, however, above improvement measures will lead to a slightly increasing total mass of the fuel system.It is advisable to set a second pump on the engine in parallel with the first one. It will run in case the first one fails for some reasons. The second pump, like the first pump, can be driven from the

  8. Developing a Procedure for Segmenting Meshed Heat Networks of Heat Supply Systems without Outflows

    Science.gov (United States)

    Tokarev, V. V.

    2018-06-01

    The heat supply systems of cities have, as a rule, a ring structure with the possibility of redistributing the flows. Despite the fact that a ring structure is more reliable than a radial one, the operators of heat networks prefer to use them in normal modes according to the scheme without overflows of the heat carrier between the heat mains. With such a scheme, it is easier to adjust the networks and to detect and locate faults in them. The article proposes a formulation of the heat network segmenting problem. The problem is set in terms of optimization with the heat supply system's excessive hydraulic power used as the optimization criterion. The heat supply system computer model has a hierarchically interconnected multilevel structure. Since iterative calculations are only carried out for the level of trunk heat networks, decomposing the entire system into levels allows the dimensionality of the solved subproblems to be reduced by an order of magnitude. An attempt to solve the problem by fully enumerating possible segmentation versions does not seem to be feasible for systems of really existing sizes. The article suggests a procedure for searching rational segmentation of heat supply networks with limiting the search to versions of dividing the system into segments near the flow convergence nodes with subsequent refining of the solution. The refinement is performed in two stages according to the total excess hydraulic power criterion. At the first stage, the loads are redistributed among the sources. After that, the heat networks are divided into independent fragments, and the possibility of increasing the excess hydraulic power in the obtained fragments is checked by shifting the division places inside a fragment. The proposed procedure has been approbated taking as an example a municipal heat supply system involving six heat mains fed from a common source, 24 loops within the feeding mains plane, and more than 5000 consumers. Application of the proposed

  9. Reliability and protection against failure in computer systems

    International Nuclear Information System (INIS)

    Daniels, B.K.

    1979-01-01

    Computers are being increasingly integrated into the control and safety systems of large and potentially hazardous industrial processes. This development introduces problems which are particular to computer systems and opens the way to new techniques of solving conventional reliability and availability problems. References to the developing fields of software reliability, human factors and software design are given, and these subjects are related, where possible, to the quantified assessment of reliability. Original material is presented in the areas of reliability growth and computer hardware failure data. The report draws on the experience of the National Centre of Systems Reliability in assessing the capability and reliability of computer systems both within the nuclear industry, and from the work carried out in other industries by the Systems Reliability Service. (author)

  10. Life Support with Failures and Variable Supply

    Science.gov (United States)

    Jones, Harry

    2010-01-01

    The life support system for long duration missions will recycle oxygen and water to reduce the material resupply mass from Earth. The impact of life support failures was investigated by dynamic simulation of a lunar outpost habitat life support model. The model was modified to simulate resupply delays, power failures, recycling system failures, and storage failures. Many failures impact the lunar outpost water supply directly or indirectly, depending on the water balance and water storage. Failure effects on the water supply are reduced if Extra Vehicular Activity (EVA) water use is low and the water supply is ample. Additional oxygen can be supplied by scavenging unused propellant or by production from regolith, but the amounts obtained can vary significantly. The requirements for oxygen and water can also vary significantly, especially for EVA. Providing storage buffers can improve efficiency and reliability, and minimize the chance of supply failing to meet demand. Life support failures and supply variations can be survivable if effective solutions are provided by the system design

  11. Automation of reliability evaluation procedures through CARE - The computer-aided reliability estimation program.

    Science.gov (United States)

    Mathur, F. P.

    1972-01-01

    Description of an on-line interactive computer program called CARE (Computer-Aided Reliability Estimation) which can model self-repair and fault-tolerant organizations and perform certain other functions. Essentially CARE consists of a repository of mathematical equations defining the various basic redundancy schemes. These equations, under program control, are then interrelated to generate the desired mathematical model to fit the architecture of the system under evaluation. The mathematical model is then supplied with ground instances of its variables and is then evaluated to generate values for the reliability-theoretic functions applied to the model.

  12. Systems approach to design of power supply to mines

    Energy Technology Data Exchange (ETDEWEB)

    Shul' ga, Yu I; Voloshko, A V

    1986-09-01

    Optimization of power supplies to underground coal mines in the USSR is evaluated. Systems analysis of power systems is discussed. Power system of a coal mine is treated as an element of the branch power system which forms a subsystem of the local and national power system. Design of a system for computerized control of power supplies to underground coal mines is evaluated. Elements of the system, control equipment, types of information stored and processed by the system as well as economic efficiency of using computerized control for power supply in underground mining are discussed. Recommendations for computer-aided design of power systems and use of computerized control systems for power supply in underground coal mining in the USSR are made.

  13. Exact reliability quantification of highly reliable systems with maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bris, Radim, E-mail: radim.bris@vsb.c [VSB-Technical University Ostrava, Faculty of Electrical Engineering and Computer Science, Department of Applied Mathematics, 17. listopadu 15, 70833 Ostrava-Poruba (Czech Republic)

    2010-12-15

    When a system is composed of highly reliable elements, exact reliability quantification may be problematic, because computer accuracy is limited. Inaccuracy can be due to different aspects. For example, an error may be made when subtracting two numbers that are very close to each other, or at the process of summation of many very different numbers, etc. The basic objective of this paper is to find a procedure, which eliminates errors made by PC when calculations close to an error limit are executed. Highly reliable system is represented by the use of directed acyclic graph which is composed from terminal nodes, i.e. highly reliable input elements, internal nodes representing subsystems and edges that bind all of these nodes. Three admissible unavailability models of terminal nodes are introduced, including both corrective and preventive maintenance. The algorithm for exact unavailability calculation of terminal nodes is based on merits of a high-performance language for technical computing MATLAB. System unavailability quantification procedure applied to a graph structure, which considers both independent and dependent (i.e. repeatedly occurring) terminal nodes is based on combinatorial principle. This principle requires summation of a lot of very different non-negative numbers, which may be a source of an inaccuracy. That is why another algorithm for exact summation of such numbers is designed in the paper. The summation procedure uses benefits from a special number system with the base represented by the value 2{sup 32}. Computational efficiency of the new computing methodology is compared with advanced simulation software. Various calculations on systems from references are performed to emphasize merits of the methodology.

  14. Reliability analysis of shutdown system

    International Nuclear Information System (INIS)

    Kumar, C. Senthil; John Arul, A.; Pal Singh, Om; Suryaprakasa Rao, K.

    2005-01-01

    This paper presents the results of reliability analysis of Shutdown System (SDS) of Indian Prototype Fast Breeder Reactor. Reliability analysis carried out using Fault Tree Analysis predicts a value of 3.5 x 10 -8 /de for failure of shutdown function in case of global faults and 4.4 x 10 -8 /de for local faults. Based on 20 de/y, the frequency of shutdown function failure is 0.7 x 10 -6 /ry, which meets the reliability target, set by the Indian Atomic Energy Regulatory Board. The reliability is limited by Common Cause Failure (CCF) of actuation part of SDS and to a lesser extent CCF of electronic components. The failure frequency of individual systems is -3 /ry, which also meets the safety criteria. Uncertainty analysis indicates a maximum error factor of 5 for the top event unavailability

  15. Development of an integrated medical supply information system

    Science.gov (United States)

    Xu, Eric; Wermus, Marek; Blythe Bauman, Deborah

    2011-08-01

    The integrated medical supply inventory control system introduced in this study is a hybrid system that is shaped by the nature of medical supply, usage and storage capacity limitations of health care facilities. The system links demand, service provided at the clinic, health care service provider's information, inventory storage data and decision support tools into an integrated information system. ABC analysis method, economic order quantity model, two-bin method and safety stock concept are applied as decision support models to tackle inventory management issues at health care facilities. In the decision support module, each medical item and storage location has been scrutinised to determine the best-fit inventory control policy. The pilot case study demonstrates that the integrated medical supply information system holds several advantages for inventory managers, since it entails benefits of deploying enterprise information systems to manage medical supply and better patient services.

  16. Reliability issues : a Canadian perspective

    International Nuclear Information System (INIS)

    Konow, H.

    2004-01-01

    A Canadian perspective of power reliability issues was presented. Reliability depends on adequacy of supply and a framework for standards. The challenges facing the electric power industry include new demand, plant replacement and exports. It is expected that demand will by 670 TWh by 2020, with 205 TWh coming from new plants. Canada will require an investment of $150 billion to meet this demand and the need is comparable in the United States. As trade grows, the challenge becomes a continental issue and investment in the bi-national transmission grid will be essential. The 5 point plan of the Canadian Electricity Association is to: (1) establish an investment climate to ensure future electricity supply, (2) move government and industry towards smart and effective regulation, (3) work to ensure a sustainable future for the next generation, (4) foster innovation and accelerate skills development, and (5) build on the strengths of an integrated North American system to maximize opportunity for Canadians. The CEA's 7 measures that enhance North American reliability were listed with emphasis on its support for a self-governing international organization for developing and enforcing mandatory reliability standards. CEA also supports the creation of a binational Electric Reliability Organization (ERO) to identify and solve reliability issues in the context of a bi-national grid. tabs., figs

  17. Photovoltaic and Wind Turbine Integration Applying Cuckoo Search for Probabilistic Reliable Optimal Placement

    OpenAIRE

    R. A. Swief; T. S. Abdel-Salam; Noha H. El-Amary

    2018-01-01

    This paper presents an efficient Cuckoo Search Optimization technique to improve the reliability of electrical power systems. Various reliability objective indices such as Energy Not Supplied, System Average Interruption Frequency Index, System Average Interruption, and Duration Index are the main indices indicating reliability. The Cuckoo Search Optimization (CSO) technique is applied to optimally place the protection devices, install the distributed generators, and to determine the size of ...

  18. Hybrid photovoltaic-diesel-battery systems for remote energy supply

    Energy Technology Data Exchange (ETDEWEB)

    Bopp, G.; Gabler, H.; Kiefer, K.; Preiser, K.; Wiemken, E. [Fraunhofer Institute for Solar Energy Systems ISE, Freiburg (Germany)

    1997-12-31

    Photovoltaic solar generators combined with diesel engines and battery energy storage are powering isolated mountain lodges, information centres in nature parks, isolated farms or dwellings all over Europe. A total of 300000 buildings in Europe are estimated to be not connected to the public grid. This represents a major market potential for photovoltaics, as often photovoltaic power generation is less expensive than a connection to the electric utility. The Fraunhofer Institute for Solar Energy Systems ISE has planned, realized and monitored about 30 hybrid remote energy supply systems with PV generators typically around 5 kW for loads typically around 20 kWh per day. More than one hundred years of operational experience accumulated so far, are a sound foundation on which to draw an interim balance over problems solved and technical questions still under development. Room for further technical development is seen in the domain of system reliability and the reduction of operating costs as well as in the optimization of the utilisation of the electric energy produced by the PV generator. (orig.) 8 refs.

  19. 30 CFR 36.27 - Fuel-supply system.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuel-supply system. 36.27 Section 36.27 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF... Construction and Design Requirements § 36.27 Fuel-supply system. (a) Fuel tank. (1) The fuel tank shall not...

  20. Systemic-Functional Approach to Utilities Supplys

    Directory of Open Access Journals (Sweden)

    Nikolay I. Komkov

    2017-01-01

    Full Text Available Purpose: the purpose of the article consists in statement of management approach to development of utilities supply processes based on conflict situations decision – making search. It had appeared in the period of the transition from the planned and directive management to market development. Methods: the research methodology is based on the system analysis of full life cycle processes functioning, forecasting of complex systems development, mathematical modeling of processes of services supply and innovative and investment projects modeling as well as development of supplying services processes. Results: the results of the work are concentrated in the presentation of systemic-functional approach to managing the development of processes of municipal services, able to resolve conflict situations in this sphere. Conclusions and Relevance: the traditional management approach on the basis of elimination of "bottlenecks" and emergencies prevailing within planned and directive system at its transformation in the market conditions has led to accumulation of conflict situations and unsolvable problems. The offered systemic-functional approach based on forecasting of full life cycle of the modernized processes and the services providing systems allows to consider costs of modernization, prime cost and quality of the rendered services. 

  1. Photovoltaic power system reliability considerations

    Science.gov (United States)

    Lalli, V. R.

    1980-01-01

    This paper describes an example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems. This particular application was for a solar cell power system demonstration project in Tangaye, Upper Volta, Africa. The techniques involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of a fail-safe and planned spare parts engineering philosophy.

  2. DEVELOPMENT OF TECHNICAL DECISIONS FOR HEAT SUPPLY WITH TUBULAR GAS HEATERS

    Directory of Open Access Journals (Sweden)

    IRODOV V. F.

    2017-05-01

    Full Text Available Annotation. Problems formulation. The problem that is solved is the development of autonomous heat supply systems that reduce the capital costs of construction and increase the efficiency of the use of energy resources. One of the ways to solve this problem is the use of tubular gas heaters. For this, it is necessary to develop new technical solutions for heat supply with tubular gas heaters, as well as scientific and methodological support for the development, construction and operation of heat supply systems with tubular gas heaters. Analysis of recent research. Preliminary studies of infrared tubular gas heaters are considered, which were used to heat industrial enterprises with sufficiently high premises. The task was to extend the principles of heat supply by means of tubular heaters for heating air, water and heating medium in relatively low rooms. Goal and tasks. To lay out the development of technical solutions for heat supply with tubular gas heaters, which increase the efficiency and reliability of heat supply systems and extend the use of tubular gas heaters in heat supply. Results. Technical solutions for heat supply with tubular gas heaters have made it possible to extend their applications for heating air, water and heating medium in relatively low rooms. Scientific novelty. New technical solutions for heat supply with tubular gas heaters increase the efficiency of using fuel and energy resources at low capital costs. Practical significance. Technical solutions for heat supply using tubular heaters have the potential for wide application in the heat supply of industrial, public and residential facilities. Conclusions. For two decades, new technical solutions for heat supply with tubular gas heaters have been developed, which increase the efficiency and reliability of heat supply systems and can be widely used for autonomous heating.

  3. Recent Advances in System Reliability Signatures, Multi-state Systems and Statistical Inference

    CERN Document Server

    Frenkel, Ilia

    2012-01-01

    Recent Advances in System Reliability discusses developments in modern reliability theory such as signatures, multi-state systems and statistical inference. It describes the latest achievements in these fields, and covers the application of these achievements to reliability engineering practice. The chapters cover a wide range of new theoretical subjects and have been written by leading experts in reliability theory and its applications.  The topics include: concepts and different definitions of signatures (D-spectra),  their  properties and applications  to  reliability of coherent systems and network-type structures; Lz-transform of Markov stochastic process and its application to multi-state system reliability analysis; methods for cost-reliability and cost-availability analysis of multi-state systems; optimal replacement and protection strategy; and statistical inference. Recent Advances in System Reliability presents many examples to illustrate the theoretical results. Real world multi-state systems...

  4. Providing all global energy with wind, water, and solar power, Part II: Reliability, system and transmission costs, and policies

    International Nuclear Information System (INIS)

    Delucchi, Mark A.; Jacobson, Mark Z.

    2011-01-01

    This is Part II of two papers evaluating the feasibility of providing all energy for all purposes (electric power, transportation, and heating/cooling), everywhere in the world, from wind, water, and the sun (WWS). In Part I, we described the prominent renewable energy plans that have been proposed and discussed the characteristics of WWS energy systems, the global demand for and availability of WWS energy, quantities and areas required for WWS infrastructure, and supplies of critical materials. Here, we discuss methods of addressing the variability of WWS energy to ensure that power supply reliably matches demand (including interconnecting geographically dispersed resources, using hydroelectricity, using demand-response management, storing electric power on site, over-sizing peak generation capacity and producing hydrogen with the excess, storing electric power in vehicle batteries, and forecasting weather to project energy supplies), the economics of WWS generation and transmission, the economics of WWS use in transportation, and policy measures needed to enhance the viability of a WWS system. We find that the cost of energy in a 100% WWS will be similar to the cost today. We conclude that barriers to a 100% conversion to WWS power worldwide are primarily social and political, not technological or even economic. - Research highlights: → We evaluate the feasibility of global energy supply from wind, water, and solar energy. → WWS energy can be supplied reliably and economically to all energy-use sectors. → The social cost of WWS energy generally is less than the cost of fossil-fuel energy. → Barriers to 100% WWS power worldwide are socio-political, not techno-economic.

  5. Design for Reliability of Power Electronic Systems

    DEFF Research Database (Denmark)

    Wang, Huai; Ma, Ke; Blaabjerg, Frede

    2012-01-01

    Advances in power electronics enable efficient and flexible processing of electric power in the application of renewable energy sources, electric vehicles, adjustable-speed drives, etc. More and more efforts are devoted to better power electronic systems in terms of reliability to ensure high......). A collection of methodologies based on Physics-of-Failure (PoF) approach and mission profile analysis are presented in this paper to perform reliability-oriented design of power electronic systems. The corresponding design procedures and reliability prediction models are provided. Further on, a case study...... on a 2.3 MW wind power converter is discussed with emphasis on the reliability critical components IGBTs. Different aspects of improving the reliability of the power converter are mapped. Finally, the challenges and opportunities to achieve more reliable power electronic systems are addressed....

  6. Specific properties of the electrical equipment in the nuclear steam supply system; Specificnosti elektricne opreme u primarnom djelu nuklearne elektrane

    Energy Technology Data Exchange (ETDEWEB)

    Smiljanic, D [Rade Koncar Institut, Zagreb (Yugoslavia)

    1979-07-01

    The paper presents description of reactor coolant pump motor in the primary coolant loop. The motor is treated as a representative of all electrical equipment in the nuclear steam supply system that has to meet all the requirements concerning reliability, minimum maintenance, radiation, seismic etc. (author)

  7. Solid State Lighting Reliability Components to Systems

    CERN Document Server

    Fan, XJ

    2013-01-01

    Solid State Lighting Reliability: Components to Systems begins with an explanation of the major benefits of solid state lighting (SSL) when compared to conventional lighting systems including but not limited to long useful lifetimes of 50,000 (or more) hours and high efficacy. When designing effective devices that take advantage of SSL capabilities the reliability of internal components (optics, drive electronics, controls, thermal design) take on critical importance. As such a detailed discussion of reliability from performance at the device level to sub components is included as well as the integrated systems of SSL modules, lamps and luminaires including various failure modes, reliability testing and reliability performance. This book also: Covers the essential reliability theories and practices for current and future development of Solid State Lighting components and systems Provides a systematic overview for not only the state-of-the-art, but also future roadmap and perspectives of Solid State Lighting r...

  8. Reliability of Power Units in Poland and the World

    OpenAIRE

    Józef Paska

    2015-01-01

    One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland), NERC (North American Electric Reliability Corporation – USA), ...

  9. Reliability and Cost Impacts for Attritable Systems

    Science.gov (United States)

    2017-03-23

    on reliability and cost: a probabilistic model. Electric Power Systems Research, 72(3), 213-224. Kalbfleisch, J.D. & Prentice, R.L. (1980). The...copyright protection in the United States. AFIT-ENV-MS-17-M-172 RELIABILITY AND COST IMPACTS FOR ATTRITABLE SYSTEMS THESIS Presented to... power of discrete time Markov chains, whether homogeneous or non-homogeneous, to model the reliability and dependability of repairable systems should

  10. Overview of system reliability analyses for PSA

    International Nuclear Information System (INIS)

    Matsuoka, Takeshi

    2012-01-01

    Overall explanations are given for many matters relating to system reliability analysis. Systems engineering, Operations research, Industrial engineering, Quality control are briefly explained. Many system reliability analysis methods including advanced methods are introduced. Discussions are given for FMEA, reliability block diagram, Markov model, Petri net, Bayesian network, goal tree success tree, dynamic flow graph methodology, cell-to-cell mapping technique, the GO-FLOW and others. (author)

  11. Reducing stock-outs of essential tuberculosis medicines: a system dynamics modelling approach to supply chain management.

    Science.gov (United States)

    Bam, L; McLaren, Z M; Coetzee, E; von Leipzig, K H

    2017-10-01

    The under-performance of supply chains presents a significant hindrance to disease control in developing countries. Stock-outs of essential medicines lead to treatment interruption which can force changes in patient drug regimens, drive drug resistance and increase mortality. This study is one of few to quantitatively evaluate the effectiveness of supply chain policies in reducing shortages and costs. This study develops a systems dynamics simulation model of the downstream supply chain for amikacin, a second-line tuberculosis drug using 10 years of South African data. We evaluate current supply chain performance in terms of reliability, responsiveness and agility, following the widely-used Supply Chain Operation Reference framework. We simulate 141 scenarios that represent different combinations of supplier characteristics, inventory management strategies and demand forecasting methods to identify the Pareto optimal set of management policies that jointly minimize the number of shortages and total cost. Despite long supplier lead times and unpredictable demand, the amikacin supply chain is 98% reliable and agile enough to accommodate a 20% increase in demand without a shortage. However, this is accomplished by overstocking amikacin by 167%, which incurs high holding costs. The responsiveness of suppliers is low: only 57% of orders are delivered to the central provincial drug depot within one month. We identify three Pareto optimal safety stock management policies. Short supplier lead time can produce Pareto optimal outcomes even in the absence of other optimal policies. This study produces concrete, actionable guidelines to cost-effectively reduce stock-outs by implementing optimal supply chain policies. Preferentially selecting drug suppliers with short lead times accommodates unexpected changes in demand. Optimal supply chain management should be an essential component of national policy to reduce the mortality rate. © The Author 2017. Published by Oxford

  12. The Supply of Medical Radioisotopes. An Economic Study of the Molybdenum-99 Supply Chain

    International Nuclear Information System (INIS)

    2010-01-01

    The reliable supply of molybdenum-99 (Mo-99) and its decay product, technetium-99m (Tc-99m), is a vital component of modern medical diagnostic practices. Disruptions in the supply chain of these radioisotopes - which cannot be effectively stored - can suspend important medical testing services. Unfortunately, supply reliability has declined over the past decade, due to unexpected or extended shutdowns at the few ageing, Mo-99 producing, research reactors and processing facilities. These shutdowns have created global supply shortages. The full study offers a unique analysis of the economic structure and present state of the Mo-99/Tc-99m supply chain. It finds that the shortages are a symptom of a longer-term problem linked to insufficient capital investment, which has been brought about by an economic structure that does not provide sufficient remuneration for producing Mo-99 or support for developing additional production and processing infrastructure. To assist governments and other decision makers in their efforts to ensure long-term, reliable supply of these important medical isotopes, the study presents options for creating a sustainable economic structure. The study will also enhance understanding amongst stakeholders of the costs of supplying Mo-99 and ultimately contribute to a better functioning market. (authors)

  13. Reliable electricity. The effects of system integration and cooperative measures to make it work

    Energy Technology Data Exchange (ETDEWEB)

    Hagspiel, Simeon [Koeln Univ. (Germany). Energiewirtschaftliches Inst.; Koeln Univ. (Germany). Dept. of Economics

    2017-12-15

    We investigate the effects of system integration for reliability of supply in regional electricity systems along with cooperative measures to support it. Specifically, we set up a model to contrast the benefits from integration through statistical balancing (i.e., a positive externality) with the risk of cascading outages (a negative externality). The model is calibrated with a comprehensive dataset comprising 28 European countries on a high spatial and temporal resolution. We find that positive externalities from system integration prevail, and that cooperation is key to meet reliability targets efficiently. To enable efficient solutions in a non-marketed environment, we formulate the problem as a cooperative game and study different rules to allocate the positive and negative effects to individual countries. Strikingly, we find that without a mechanism, the integrated solution is unstable. In contrast, proper transfer payments can be found to make all countries better off in full integration, and the Nucleolus is identified as a particularly promising candidate. The rule could be used as a basis for compensation payments to support the successful integration and cooperation of electricity systems.

  14. Reliable electricity. The effects of system integration and cooperative measures to make it work

    International Nuclear Information System (INIS)

    Hagspiel, Simeon; Koeln Univ.

    2017-01-01

    We investigate the effects of system integration for reliability of supply in regional electricity systems along with cooperative measures to support it. Specifically, we set up a model to contrast the benefits from integration through statistical balancing (i.e., a positive externality) with the risk of cascading outages (a negative externality). The model is calibrated with a comprehensive dataset comprising 28 European countries on a high spatial and temporal resolution. We find that positive externalities from system integration prevail, and that cooperation is key to meet reliability targets efficiently. To enable efficient solutions in a non-marketed environment, we formulate the problem as a cooperative game and study different rules to allocate the positive and negative effects to individual countries. Strikingly, we find that without a mechanism, the integrated solution is unstable. In contrast, proper transfer payments can be found to make all countries better off in full integration, and the Nucleolus is identified as a particularly promising candidate. The rule could be used as a basis for compensation payments to support the successful integration and cooperation of electricity systems.

  15. Transmission reliability faces future challenges

    International Nuclear Information System (INIS)

    Beaty, W.

    1993-01-01

    The recently published Washington International Energy Group's 1993 Electric Utility Outlook states that nearly one-third (31 percent) of U.S. utility executives expect reliability to decrease in the near future. Electric power system stability is crucial to reliability. Stability analysis determines whether a system will stay intact under normal operating conditions, during minor disturbances such as load fluctuations, and during major disturbances when one or more parts of the system fails. All system elements contribute to reliability or the lack of it. However, this report centers on the transmission segment of the electric system. The North American Electric Reliability Council (NERC) says the transmission systems as planned will be adequate over the next 10 years. However, delays in building new lines and increasing demands for transmission services are serious concerns. Reliability concerns exist in the Mid-Continent Area Power Pool and the Mid-America Interconnected Network regions where transmission facilities have not been allowed to be constructed as planned. Portions of the transmission systems in other regions are loaded at or near their limits. NERC further states that utilities must be allowed to complete planned generation and transmission as scheduled. A reliable supply of electricity also depends on adhering to established operating criteria. Factors that could complicate operations include: More interchange schedules resulting from increased transmission services. Increased line loadings in portions of the transmission systems. Proliferation of non-utility generators

  16. Hydropower recovery in water supply systems: Models and case study

    International Nuclear Information System (INIS)

    Vilanova, Mateus Ricardo Nogueira; Balestieri, José Antônio Perrella

    2014-01-01

    Highlights: • We present hydropower recovery models for water supply systems. • Hydropower recovery potential in water supply systems is highly variable. • The case studied could make the supply systems self-sufficient in terms of energy. • Hydropower recovery can reduce GHGs emissions and generate carbon credits. - Abstract: The energy efficiency of water supply systems can be increased through the recovery of hydraulic energy implicit to the volumes of water transported in various stages of the supply process, which can be converted into electricity through hydroelectric recovery systems. Such a process allows the use of a clean energy source that is usually neglected in water supplies, reducing its dependence on energy from the local network and the system’s operation costs. This article evaluates the possibilities and benefits of the use of water supply facilities, structures and equipment for hydraulic energy recovery, addressing several applicable hydroelectric models. A real case study was developed in Brazil to illustrate the technical, economic and environmental aspects of hydropower recovery in water supply systems

  17. Fundamentals and applications of systems reliability analysis

    International Nuclear Information System (INIS)

    Boesebeck, K.; Heuser, F.W.; Kotthoff, K.

    1976-01-01

    The lecture gives a survey on the application of methods of reliability analysis to assess the safety of nuclear power plants. Possible statements of reliability analysis in connection with specifications of the atomic licensing procedure are especially dealt with. Existing specifications of safety criteria are additionally discussed with the help of reliability analysis by the example of the reliability analysis of a reactor protection system. Beyond the limited application to single safety systems, the significance of reliability analysis for a closed risk concept is explained in the last part of the lecture. (orig./LH) [de

  18. Reliability evaluation of a natural circulation system

    International Nuclear Information System (INIS)

    Jafari, Jalil; D'Auria, Francesco; Kazeminejad, Hossein; Davilu, Hadi

    2003-01-01

    This paper discusses a reliability study performed with reference to a passive thermohydraulic natural circulation (NC) system, named TTL-1. A methodology based on probabilistic techniques has been applied with the main purpose to optimize the system design. The obtained results have been adopted to estimate the thermal-hydraulic reliability (TH-R) of the same system. A total of 29 relevant parameters (including nominal values and plausible ranges of variations) affecting the design and the NC performance of the TTL-1 loop are identified and a probability of occurrence is assigned for each value based on expert judgment. Following procedures established for the uncertainty evaluation of thermal-hydraulic system codes results, 137 system configurations have been selected and each configuration has been analyzed via the Relap5 best-estimate code. The reference system configuration and the failure criteria derived from the 'mission' of the passive system are adopted for the evaluation of the system TH-R. Four different definitions of a less-than-unity 'reliability-values' (where unity represents the maximum achievable reliability) are proposed for the performance of the selected passive system. This is normally considered fully reliable, i.e. reliability-value equal one, in typical Probabilistic Safety Assessment (PSA) applications in nuclear reactor safety. The two 'point' TH-R values for the considered NC system were found equal to 0.70 and 0.85, i.e. values comparable with the reliability of a pump installed in an 'equivalent' forced circulation (active) system having the same 'mission'. The design optimization study was completed by a regression analysis addressing the output of the 137 calculations: heat losses, undetected leakage, loop length, riser diameter, and equivalent diameter of the test section have been found as the most important parameters bringing to the optimal system design and affecting the TH-R. As added values for this work, the comparison has

  19. Reliability performance of standby equipment with periodic testing

    International Nuclear Information System (INIS)

    Sim, S.H.

    1985-11-01

    In this report, the reliability performance of standby equipment subjected to periodic testing is studied. analytical expressions have been derived for reliability measures, such as the man accumulated operating time to failure, the expected number of tests between two consecutive failures, the mean time to failure following an emergency start-up and the probability of failing to complete an emergency mission of a specified duration. These results are useful for the reliability assessment of standby equipment such as combustion turbine units of the emergency power supply system, and of the Class III power system at a nuclear generating station

  20. Piggy-back power supplies for magnet systems

    International Nuclear Information System (INIS)

    Gano, J.J.

    1977-01-01

    In accelerator facilities, particularly beam switchyards, it is common to have two or more related magnets which require nearly the same dc current. Presently the magnets are energized from separate sources, or from a single current-regulated source, with the magnets connected in series, and current-sink shunts across one or more of the magnets to obtain the difference. Advantages are discussed of economy, efficiency, reliability, and flexibility which accrue if auxiliary power supplies are used to trim the currents by the addition of more current to one or more magnets

  1. Performance analysis of Supply Chain Management with Supply Chain Operation reference model

    Science.gov (United States)

    Hasibuan, Abdurrozzaq; Arfah, Mahrani; Parinduri, Luthfi; Hernawati, Tri; Suliawati; Harahap, Bonar; Rahmah Sibuea, Siti; Krianto Sulaiman, Oris; purwadi, Adi

    2018-04-01

    This research was conducted at PT. Shamrock Manufacturing Corpora, the company is required to think creatively to implement competition strategy by producing goods/services that are more qualified, cheaper. Therefore, it is necessary to measure the performance of Supply Chain Management in order to improve the competitiveness. Therefore, the company is required to optimize its production output to meet the export quality standard. This research begins with the creation of initial dimensions based on Supply Chain Management process, ie Plan, Source, Make, Delivery, and Return with hierarchy based on Supply Chain Reference Operation that is Reliability, Responsiveness, Agility, Cost, and Asset. Key Performance Indicator identification becomes a benchmark in performance measurement whereas Snorm De Boer normalization serves to equalize Key Performance Indicator value. Analiytical Hierarchy Process is done to assist in determining priority criteria. Measurement of Supply Chain Management performance at PT. Shamrock Manufacturing Corpora produces SC. Responsiveness (0.649) has higher weight (priority) than other alternatives. The result of performance analysis using Supply Chain Reference Operation model of Supply Chain Management performance at PT. Shamrock Manufacturing Corpora looks good because its monitoring system between 50-100 is good.

  2. 75 FR 35689 - System Personnel Training Reliability Standards

    Science.gov (United States)

    2010-06-23

    ... planning staff at control areas and reliability coordinators concerning power system characteristics and... Coordination--Staffing). \\11\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, Federal... American bulk electric system are competent to perform those reliability-related tasks.\\22\\ The proposed...

  3. Influence of reliability of the relay protection to the whole reliability of electric power systems

    International Nuclear Information System (INIS)

    Stojanovski, Ljupcho I.

    2001-01-01

    The influence of the reliability of the elements of relay protection up today analyses of the reliability on electric power systems, very rare has been taken into consideration, in other words, in these analyses it is assumed that the reliability of the protection has value one. In this work an attempt is that through modelling of individual types of protection of the elements of high-voltage systems to make calculation to the influence of the reliability of the relay protection on the total reliability of the high-voltage systems.(Author)

  4. DIII-D ICRF high voltage power supply regulator upgrade

    International Nuclear Information System (INIS)

    Cary, W.P.; Burley, B.L.; Grosnickle, W.H.

    1997-11-01

    For reliable operation and component protection, of the 2 MW 30--120 MHz ICRF Amplifier System on DIII-D, it is desirable for the amplifier to respond to high VSWR conditions as rapidly as possible. This requires a rapid change in power which also means a rapid change in the high voltage power supply current demands. An analysis of the power supply's regulator dynamics was needed to verify its expected operation during such conditions. Based on this information it was found that a new regulator with a larger dynamic range and some anticipation capability would be required. This paper will discuss the system requirements, the as-delivered regulator performance, and the improved performance after installation of the new regulator system. It will also be shown how this improvement has made the amplifier perform at higher power levels more reliably

  5. 75 FR 71625 - System Restoration Reliability Standards

    Science.gov (United States)

    2010-11-24

    ... to start operating and delivering electric power without assistance from the electric system... and system restoration and reporting following disturbances. \\3\\ North American Electric Reliability... Reliability Standards for the Bulk-Power System and determined that the proposed requirements are necessary to...

  6. User's guide to the Reliability Estimation System Testbed (REST)

    Science.gov (United States)

    Nicol, David M.; Palumbo, Daniel L.; Rifkin, Adam

    1992-01-01

    The Reliability Estimation System Testbed is an X-window based reliability modeling tool that was created to explore the use of the Reliability Modeling Language (RML). RML was defined to support several reliability analysis techniques including modularization, graphical representation, Failure Mode Effects Simulation (FMES), and parallel processing. These techniques are most useful in modeling large systems. Using modularization, an analyst can create reliability models for individual system components. The modules can be tested separately and then combined to compute the total system reliability. Because a one-to-one relationship can be established between system components and the reliability modules, a graphical user interface may be used to describe the system model. RML was designed to permit message passing between modules. This feature enables reliability modeling based on a run time simulation of the system wide effects of a component's failure modes. The use of failure modes effects simulation enhances the analyst's ability to correctly express system behavior when using the modularization approach to reliability modeling. To alleviate the computation bottleneck often found in large reliability models, REST was designed to take advantage of parallel processing on hypercube processors.

  7. Developing Reliable Life Support for Mars

    Science.gov (United States)

    Jones, Harry W.

    2017-01-01

    A human mission to Mars will require highly reliable life support systems. Mars life support systems may recycle water and oxygen using systems similar to those on the International Space Station (ISS). However, achieving sufficient reliability is less difficult for ISS than it will be for Mars. If an ISS system has a serious failure, it is possible to provide spare parts, or directly supply water or oxygen, or if necessary bring the crew back to Earth. Life support for Mars must be designed, tested, and improved as needed to achieve high demonstrated reliability. A quantitative reliability goal should be established and used to guide development t. The designers should select reliable components and minimize interface and integration problems. In theory a system can achieve the component-limited reliability, but testing often reveal unexpected failures due to design mistakes or flawed components. Testing should extend long enough to detect any unexpected failure modes and to verify the expected reliability. Iterated redesign and retest may be required to achieve the reliability goal. If the reliability is less than required, it may be improved by providing spare components or redundant systems. The number of spares required to achieve a given reliability goal depends on the component failure rate. If the failure rate is under estimated, the number of spares will be insufficient and the system may fail. If the design is likely to have undiscovered design or component problems, it is advisable to use dissimilar redundancy, even though this multiplies the design and development cost. In the ideal case, a human tended closed system operational test should be conducted to gain confidence in operations, maintenance, and repair. The difficulty in achieving high reliability in unproven complex systems may require the use of simpler, more mature, intrinsically higher reliability systems. The limitations of budget, schedule, and technology may suggest accepting lower and

  8. Economics of PV power supply for Libyan remote areas

    International Nuclear Information System (INIS)

    La-azebi, I.F.; Kagilik, A.S.; Bara, M.F.

    2000-01-01

    The electrical power supplies of remote and isolated areas has been and is still an issue for electric power companies worldwide. Usually there are three ways of supplying these remote areas mainly, the general grid, the Diesel generators, and photovoltaic power supply. The use of one of these systems instead of the other depend, on the availability, reliability, and cost. There are some isolated areas, which can t be supplied from the general grid as they are far away from it and economically not visible, so the electric power is needed of such isolated areas will be supplied either by Diesel generators or photovoltaics. The use of diesel generator demands a constant fuel supply, and maintenance staff, which also may not be available in small villages. Therefore the PV generators in such cases are considered an ideal solution of supplying these areas. In Libya, a national program has been started to supply small villages and other loads in remote and isolated areas, with electricity using PV power supply. This paper presents an economical comparison between the two different alternatives of electric supply systems to be used in remote areas: Diesel generators and PV systems. (Author)

  9. Reliability demonstration of imaging surveillance systems

    International Nuclear Information System (INIS)

    Sheridan, T.F.; Henderson, J.T.; MacDiarmid, P.R.

    1979-01-01

    Security surveillance systems which employ closed circuit television are being deployed with increasing frequency for the protection of property and other valuable assets. A need exists to demonstrate the reliability of such systems before their installation to assure that the deployed systems will operate when needed with only the scheduled amount of maintenance and support costs. An approach to the reliability demonstration of imaging surveillance systems which employ closed circuit television is described. Failure definitions based on industry television standards and imaging alarm assessment criteria for surveillance systems are discussed. Test methods which allow 24 hour a day operation without the need for numerous test scenarios, test personnel and elaborate test facilities are presented. Existing reliability demonstration standards are shown to apply which obviate the need for elaborate statistical tests. The demonstration methods employed are shown to have applications in other types of imaging surveillance systems besides closed circuit television

  10. Interaction between supply and end-use

    International Nuclear Information System (INIS)

    Skytte, K.; Noergaard, P.; Togeby, M.

    2005-01-01

    In a future power system with a high proportion of distributed and intermittent generation, it will be difficult and costly to ensure short-term security of supply if demand is unable to react to fluctuations on the supply side. At present, most power consumers in the EU, with the exception of the largest consumers such as energy intensive industries, buy their power on fixed tariffs. Fixed tariffs provide no incentives for consumers to alter their patterns of power consumption. This calls for more interaction between the supply and demand sides, which in turn would allow better matching of demand to intermittent supply. The development of cheap and reliable electronic communication technologies has made this a realistic option, so we are left with the general question of how the demand side can become more active in the future power market. Liberalisation of the wholesale power markets has introduced market-based pricing for the marginal electricity supply. Prices are set hourly, or even more frequently, by reference to the balance between the expected demand and supply at the time. If the expected demand exceeds supply, prices increase until demand falls or more generation comes on line. If supply exceeds demand, prices fall. In this way, market prices are used to determine the balance level between generation and consumption. In liquid markets, the power price is a reliable indicator of the state of the electricity system. Price fluctuations reveal the cost of marginal production capacity; very high prices indicate that capacity is limited compared with demand. At present, it is mostly the generation side that adjust their supply in order to create balance between supply and expected demand. If demand, as well as supply, could respond to price signals from the market, the flexibility of the energy system would increase. This would make it easier to increase the proportion of intermittent renewable energy sources in the system. Demand response (DR) is the term

  11. Conceptual study on HTGR-IS hydrogen supply system using organic hydrides

    International Nuclear Information System (INIS)

    Terada, Atsuhiko; Noguchi, Hiroki; Takegami, Hiroaki; Kamiji, Yu; Inagaki, Yoshiyuki

    2012-02-01

    We have proposed a hydrogen supply-chain system, which is a storage/supply system of large amount of hydrogen produced by HTGR-IS hydrogen production system. The organic chemical hydride method is one of the candidate techniques in the system for hydrogen storage and transportation. In this study, properties of organic hydrides and conventional hydrogen storage/supply system were surveyed to make use of the conceptual design of the hydrogen supply system using an organic hydrides method with VHTR-IS hydrogen production process (hydrogen production: 85,400 Nm 3 /h). Conceptual specifications of the main equipments were designed for the hydrogen supply system consisting of hydrogenation and dehydrogenation process. It was also clarified the problems of hydrogen supply system, such as energy efficiency and system optimization. (author)

  12. Reliability of Power Units in Poland and the World

    Directory of Open Access Journals (Sweden)

    Józef Paska

    2015-09-01

    Full Text Available One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland, NERC (North American Electric Reliability Corporation – USA, and WEC (World Energy Council. Deficiencies and the lack of a unified national system for collecting and processing electric power equipment unavailability data are also indicated.

  13. Field reliability of electronic systems

    International Nuclear Information System (INIS)

    Elm, T.

    1984-02-01

    This report investigates, through several examples from the field, the reliability of electronic units in a broader sense. That is, it treats not just random parts failure, but also inadequate reliability design and (externally and internally) induced failures. The report is not meant to be merely an indication of the state of the art for the reliability prediction methods we know, but also as a contribution to the investigation of man-machine interplay in the operation and repair of electronic equipment. The report firmly links electronics reliability to safety and risk analyses approaches with a broader, system oriented view of reliability prediction and with postfailure stress analysis. It is intended to reveal, in a qualitative manner, the existence of symptom and cause patterns. It provides a background for further investigations to identify the detailed mechanisms of the faults and the remedical actions and precautions for achieving cost effective reliability. (author)

  14. Monitoring of heavy metals in selected Water Supply Systems in Poland, in relation to current regulations

    Science.gov (United States)

    Szuster-Janiaczyk, Agnieszka; Zeuschner, Piotr; Noga, Paweł; Skrzypczak, Marta

    2018-02-01

    The study presents an analysis of water quality monitoring in terms of the content of heavy metals, which is conducted in three independent water supply systems in Poland. The analysis showed that the monitoring of heavy metals isn't reliable - both the quantity of tested water samples and the location of the monitoring points are the problem. The analysis of changes in water quality from raw water to tap water was possible only for one of the analysed systems and indicate a gradual deterioration of water quality, although still within acceptable limits of legal regulations.

  15. New supply for canyon fire foam system

    International Nuclear Information System (INIS)

    Gainey, T.

    1995-01-01

    The raw water supply for the B-Plant Canyon fire foam system is being replaced. The 4 inche water supply line to the foam system is being rerouted from the 6 inches raw water line in the Pipe Gallery to the 10 inches raw water main in the Operating Gallery. This document states the acceptance criteria for the flushing and testing to be performed by the contractor

  16. The Supply of Medical Radioisotopes An Economic Study of the Molybdenum-99 Supply Chain: Summary

    International Nuclear Information System (INIS)

    2010-01-01

    The reliable supply of molybdenum-99 (Mo-99) and its decay product, technetium-99m (Tc-99m), is a vital component of modern medical diagnostic practices. Disruptions in the supply chain of these radioisotopes - which cannot be effectively stored - can suspend important medical testing services. Unfortunately, supply reliability has declined over the past decade, due to unexpected or extended shutdowns at the few ageing, Mo-99 producing, research reactors and processing facilities. These shutdowns have created global supply shortages. The full study offers a unique analysis of the economic structure and present state of the Mo-99/Tc-99m supply chain. It finds that the shortages are a symptom of a longer-term problem linked to insufficient capital investment, which has been brought about by an economic structure that does not provide sufficient remuneration for producing Mo-99 or support for developing additional production and processing infrastructure. To assist governments and other decision makers in their efforts to ensure long-term, reliable supply of these important medical isotopes, the study presents options for creating a sustainable economic structure. The study will also enhance understanding amongst stakeholders of the costs of supplying Mo-99 and ultimately contribute to a better functioning market. (authors)

  17. Cost/worth assessment of reliability improvement in distribution networks by means of artificial intelligence

    Energy Technology Data Exchange (ETDEWEB)

    Bouhouras, Aggelos S.; Labridis, Dimitris P.; Bakirtzis, Anastasios G. [Power Systems Laboratory, Aristotle University of Thessaloniki, Dept. of Electrical and Computer Engineering, 54124 Thessaloniki (Greece)

    2010-06-15

    A major challenge for the power utilities today is to ensure a high level of reliability of supply to customers. Two main factors determine the feasibility of a project that improves the reliability of supply: the project cost (investment and operational) and the benefits that result from the implementation of the project. This paper examines the implementation of an Artificial Intelligence System in an urban distribution network, capable to locate and isolate short circuit faults in the feeder, thus accomplishing immediate restoration of electric supply to the customers. The paper describes the benefits of the project, which are supply reliability improvement and distribution network loss reduction through network reconfigurations. By comparison of the project benefits and costs the economic feasibility of such a project for an underground distribution feeder in Greece is demonstrated. (author)

  18. 75 FR 72664 - System Personnel Training Reliability Standards

    Science.gov (United States)

    2010-11-26

    ...--Staffing). \\2\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 72 FR 16416 (Apr... on the North American bulk electric system are competent to perform those reliability-related tasks... PER-004-2 will achieve a significant improvement in the reliability of the Bulk- Power System and...

  19. Assessment of Electronic Circuits Reliability Using Boolean Truth Table Modeling Method

    International Nuclear Information System (INIS)

    EI-Shanshoury, A.I.

    2011-01-01

    This paper explores the use of Boolean Truth Table modeling Method (BTTM) in the analysis of qualitative data. It is widely used in certain fields especially in the fields of electrical and electronic engineering. Our work focuses on the evaluation of power supply circuit reliability using (BTTM) which involves systematic attempts to falsify and identify hypotheses on the basis of truth tables constructed from qualitative data. Reliability parameters such as the system's failure rates for the power supply case study are estimated. All possible state combinations (operating and failed states) of the major components in the circuit were listed and their effects on overall system were studied

  20. Nuclear plant reliability data system. 1979 annual reports of cumulative system and component reliability

    International Nuclear Information System (INIS)

    1979-01-01

    The primary purposes of the information in these reports are the following: to provide operating statistics of safety-related systems within a unit which may be used to compare and evaluate reliability performance and to provide failure mode and failure rate statistics on components which may be used in failure mode effects analysis, fault hazard analysis, probabilistic reliability analysis, and so forth

  1. Power supply for nuclear power plant home consumption using inverter sources

    International Nuclear Information System (INIS)

    Stepar, V.; Tvrdik, J.

    1988-01-01

    A description is presented of the system configuration of a nuclear power plant with WWER-440 and WWER-1000 units and of a system of guaranteed power supply for the plant home consumption network for a WWER-440 power plant. The power supply network consists of 6 inverter supplies for safety systems, 4 supplies for nonsystem facilities and of a minimum of three power supplies for facilities outside the units. A diagram is shown and the principle described of the currently used ABP 1500 power supply system of Soviet origin. Using the experience from its operation, a Czechoslovak inverter supply system was designed featuring parallel operation of the inverter units. The principles are given for the design of a power supply system of an output of 75 kVA, the diagram is shown and the principle described. The design allows implementing and using the system without redundancy or in redundant operation of the 2 from 3 type at an installed capacity of 66%, or of the 1 from 2 type at an installed capacity of 50% of the output. The system is undergoing tests that should verify its reliability. (J.B.). 3 figs., 1 tab

  2. Public Water Supply Systems (PWS)

    Data.gov (United States)

    Kansas Data Access and Support Center — This dataset includes boundaries for most public water supply systems (PWS) in Kansas (525 municipalities, 289 rural water districts and 13 public wholesale water...

  3. Process computers automate CERN power supply installations

    CERN Document Server

    Ullrich, H

    1974-01-01

    Computerized automation systems are being used at CERN, Geneva, to improve the capacity, operational reliability and flexibility of the power supply installations for main ring magnets in the experimental zones of particle accelerators. A detailed account of the technological problem involved is followed in the article by a description of the system configuration, the program system and field experience already gathered in similar schemes. (1 refs).

  4. System reliability effects in wind turbine blades

    DEFF Research Database (Denmark)

    Dimitrov, Nikolay Krasimirov; Friis-Hansen, Peter; Berggreen, Christian

    2012-01-01

    from reliability point of view. The present paper discusses the specifics of system reliability behavior of laminated composite sandwich panels, and solves an example system reliability problem for a glass fiber-reinforced composite sandwich structure subjected to in-plane compression.......Laminated composite sandwich panels have a layered structure, where individual layers have randomly varying stiffness and strength properties. The presence of multiple failure modes and load redistribution following partial failures are the reason for laminated composites to exhibit system behavior...

  5. Reliable computer systems design and evaluatuion

    CERN Document Server

    Siewiorek, Daniel

    2014-01-01

    Enhance your hardware/software reliabilityEnhancement of system reliability has been a major concern of computer users and designers ¦ and this major revision of the 1982 classic meets users' continuing need for practical information on this pressing topic. Included are case studies of reliablesystems from manufacturers such as Tandem, Stratus, IBM, and Digital, as well as coverage of special systems such as the Galileo Orbiter fault protection system and AT&T telephone switching processors.

  6. Probabilistic risk assessment course documentation. Volume 3. System reliability and analysis techniques, Session A - reliability

    International Nuclear Information System (INIS)

    Lofgren, E.V.

    1985-08-01

    This course in System Reliability and Analysis Techniques focuses on the quantitative estimation of reliability at the systems level. Various methods are reviewed, but the structure provided by the fault tree method is used as the basis for system reliability estimates. The principles of fault tree analysis are briefly reviewed. Contributors to system unreliability and unavailability are reviewed, models are given for quantitative evaluation, and the requirements for both generic and plant-specific data are discussed. Also covered are issues of quantifying component faults that relate to the systems context in which the components are embedded. All reliability terms are carefully defined. 44 figs., 22 tabs

  7. A Reliable Wireless Control System for Tomato Hydroponics.

    Science.gov (United States)

    Ibayashi, Hirofumi; Kaneda, Yukimasa; Imahara, Jungo; Oishi, Naoki; Kuroda, Masahiro; Mineno, Hiroshi

    2016-05-05

    Agricultural systems using advanced information and communication (ICT) technology can produce high-quality crops in a stable environment while decreasing the need for manual labor. The system collects a wide variety of environmental data and provides the precise cultivation control needed to produce high value-added crops; however, there are the problems of packet transmission errors in wireless sensor networks or system failure due to having the equipment in a hot and humid environment. In this paper, we propose a reliable wireless control system for hydroponic tomato cultivation using the 400 MHz wireless band and the IEEE 802.15.6 standard. The 400 MHz band, which is lower than the 2.4 GHz band, has good obstacle diffraction, and zero-data-loss communication is realized using the guaranteed time-slot method supported by the IEEE 802.15.6 standard. In addition, this system has fault tolerance and a self-healing function to recover from faults such as packet transmission failures due to deterioration of the wireless communication quality. In our basic experiments, the 400 MHz band wireless communication was not affected by the plants' growth, and the packet error rate was less than that of the 2.4 GHz band. In summary, we achieved a real-time hydroponic liquid supply control with no data loss by applying a 400 MHz band WSN to hydroponic tomato cultivation.

  8. A Reliable Wireless Control System for Tomato Hydroponics

    Science.gov (United States)

    Ibayashi, Hirofumi; Kaneda, Yukimasa; Imahara, Jungo; Oishi, Naoki; Kuroda, Masahiro; Mineno, Hiroshi

    2016-01-01

    Agricultural systems using advanced information and communication (ICT) technology can produce high-quality crops in a stable environment while decreasing the need for manual labor. The system collects a wide variety of environmental data and provides the precise cultivation control needed to produce high value-added crops; however, there are the problems of packet transmission errors in wireless sensor networks or system failure due to having the equipment in a hot and humid environment. In this paper, we propose a reliable wireless control system for hydroponic tomato cultivation using the 400 MHz wireless band and the IEEE 802.15.6 standard. The 400 MHz band, which is lower than the 2.4 GHz band, has good obstacle diffraction, and zero-data-loss communication is realized using the guaranteed time-slot method supported by the IEEE 802.15.6 standard. In addition, this system has fault tolerance and a self-healing function to recover from faults such as packet transmission failures due to deterioration of the wireless communication quality. In our basic experiments, the 400 MHz band wireless communication was not affected by the plants’ growth, and the packet error rate was less than that of the 2.4 GHz band. In summary, we achieved a real-time hydroponic liquid supply control with no data loss by applying a 400 MHz band WSN to hydroponic tomato cultivation. PMID:27164105

  9. ARCHITECTURE AND RELIABILITY OF OPERATING SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav V. Nazarov

    2018-03-01

    Full Text Available Progress in the production technology of microprocessors significantly increased reliability and performance of the computer systems hardware. It cannot be told about the corresponding characteristics of the software and its basis – the operating system (OS. Some achievements of program engineering are more modest in this field. Both directions of OS improvement (increasing of productivity and reliability are connected with the development of effective structures of these systems. OS functional complexity leads to the multiplicity of the structure, which is further enhanced by the specialization of the operating system depending on scope of computer system (complex scientific calculations, real time, information retrieval systems, systems of the automated and automatic control, etc. The functional complexity of the OS leads to the complexity of its architecture, which is further enhanced by the specialization of the operating system, depending on the computer system application area (complex scientific calculations, real-time, information retrieval systems, automated and automatic control systems, etc.. That fact led to variety of modern OS. It is possible to estimate reliability of different OS structures only as results of long-term field experiment or simulation modeling. However it is most often unacceptable because of time and funds expenses for carrying out such research. This survey attempts to evaluate the reliability of two main OS architectures: large multi-layered modular core and a multiserver (client-server system. Represented by continuous Markov chains which are explored in the stationary mode on the basis of transition from systems of the differential equations of Kolmogorov to system of the linear algebraic equations, models of these systems are developed.

  10. Prospects for development of heat supply systems in high-rise districts

    Science.gov (United States)

    Zhila, Viktor; Solovyeva, Elena

    2018-03-01

    The article analyzes the main advantages and disadvantages of centralized and decentralized heat supply systems in high-rise districts. The main schemes of centralized heat supply systems are considered. They include centralized heat supply from boiler houses, centralized heat supply from autonomous heat sources, heat supply from roof boiler houses and door-to-door heating supply. For each of these variant, the gas distribution systems are considered and analyzed. These systems vary depending on the heat source location. For each of these systems, technical and economic indicators are taken into account, the analysis of which allows choosing the best option for districts where high-rise buildings predominate.

  11. Knowledge management system for risk mitigation in supply chain uncertainty: case from automotive battery supply chain

    Science.gov (United States)

    Marie, I. A.; Sugiarto, D.; Surjasa, D.; Witonohadi, A.

    2018-01-01

    Automotive battery supply chain include battery manufacturer, sulphuric acid suppliers, polypropylene suppliers, lead suppliers, transportation service providers, warehouses, retailers and even customers. Due to the increasingly dynamic condition of the environment, supply chain actors were required to improve their ability to overcome various uncertainty issues in the environment. This paper aims to describe the process of designing a knowledge management system for risk mitigation in supply chain uncertainty. The design methodology began with the identification of the knowledge needed to solve the problems associated with uncertainty and analysis of system requirements. The design of the knowledge management system was described in the form of a data flow diagram. The results of the study indicated that key knowledge area that needs to be managed were the knowledge to maintain the stability of process in sulphuric acid process and knowledge to overcome the wastes in battery manufacturing process. The system was expected to be a media acquisition, dissemination and storage of knowledge associated with the uncertainty in the battery supply chain and increase the supply chain performance.

  12. Reliability of operating WWER monitoring systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.A.; Goldrin, V.M.; Garagulya, A.V.

    1996-01-01

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs

  13. Reliability of operating WWER monitoring systems

    Energy Technology Data Exchange (ETDEWEB)

    Yastrebenetsky, M A; Goldrin, V M; Garagulya, A V [Ukrainian State Scientific Technical Center of Nuclear and Radiation Safety, Kharkov (Ukraine). Instrumentation and Control Systems Dept.

    1997-12-31

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs.

  14. DAΦNE magnet power supply system

    International Nuclear Information System (INIS)

    Ricci, R.; Sanelli, C.; Stecchi, A.

    1998-01-01

    The e + -e - , 1020 MeV at center of mass, Particle Accelerator Complex DAΦNE, consists of a linear accelerator (Linac), a damping ring (D.A.), nearly 180 m of transfer lines (T.L.) and two storage rings (S.R.), that intersect each other in two points (I.P.), for Φ particle production. The D.A., T.L. and S.R. magnets are powered by means of 462 power supplies, rating from 100 W to 1 MW. The very different output currents, from 10 A to 2300 A, and output voltages, from 8 V to 1300 V, imposed many different technical solution realized by the world industry. This paper describes the Power Supply System giving also a description of the different typologies, their characteristics and control systems. The paper reports also the power supply performances and gives information on their installation and first year operation period

  15. Reliability Growth in Space Life Support Systems

    Science.gov (United States)

    Jones, Harry W.

    2014-01-01

    A hardware system's failure rate often increases over time due to wear and aging, but not always. Some systems instead show reliability growth, a decreasing failure rate with time, due to effective failure analysis and remedial hardware upgrades. Reliability grows when failure causes are removed by improved design. A mathematical reliability growth model allows the reliability growth rate to be computed from the failure data. The space shuttle was extensively maintained, refurbished, and upgraded after each flight and it experienced significant reliability growth during its operational life. In contrast, the International Space Station (ISS) is much more difficult to maintain and upgrade and its failure rate has been constant over time. The ISS Carbon Dioxide Removal Assembly (CDRA) reliability has slightly decreased. Failures on ISS and with the ISS CDRA continue to be a challenge.

  16. 78 FR 44475 - Protection System Maintenance Reliability Standard

    Science.gov (United States)

    2013-07-24

    ... that the performance or product has some reliability-related value, then the requirement will have...] Protection System Maintenance Reliability Standard AGENCY: Federal Energy Regulatory Commission, Energy... Commission proposes to approve a revised Reliability Standard, PRC-005- 2--Protection System Maintenance, to...

  17. Optimization of urban water supply portfolios combining infrastructure capacity expansion and water use decisions

    Science.gov (United States)

    Medellin-Azuara, J.; Fraga, C. C. S.; Marques, G.; Mendes, C. A.

    2015-12-01

    The expansion and operation of urban water supply systems under rapidly growing demands, hydrologic uncertainty, and scarce water supplies requires a strategic combination of various supply sources for added reliability, reduced costs and improved operational flexibility. The design and operation of such portfolio of water supply sources merits decisions of what and when to expand, and how much to use of each available sources accounting for interest rates, economies of scale and hydrologic variability. The present research provides a framework and an integrated methodology that optimizes the expansion of various water supply alternatives using dynamic programming and combining both short term and long term optimization of water use and simulation of water allocation. A case study in Bahia Do Rio Dos Sinos in Southern Brazil is presented. The framework couples an optimization model with quadratic programming model in GAMS with WEAP, a rain runoff simulation models that hosts the water supply infrastructure features and hydrologic conditions. Results allow (a) identification of trade offs between cost and reliability of different expansion paths and water use decisions and (b) evaluation of potential gains by reducing water system losses as a portfolio component. The latter is critical in several developing countries where water supply system losses are high and often neglected in favor of more system expansion. Results also highlight the potential of various water supply alternatives including, conservation, groundwater, and infrastructural enhancements over time. The framework proves its usefulness for planning its transferability to similarly urbanized systems.

  18. Reliability of power system with open access

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A. M.; Fotuhi Firuzabad, M.; Ehsani, M.

    2003-01-01

    Recently, in many countries, electric utility industry is undergoing considerable changes in regard to its structure and regulation. It can be clearly seen that the thrust towards privatization and deregulation or re regulation of the electric utility industry will introduce numerous reliability problems that will require new criteria and analytical tools that recognize the residual uncertainties in the new environment. In this paper, different risks and uncertainties in competitive electricity markets are briefly introduced; the approach of customers, operators, planners, generation bodies and network providers to the reliability of deregulated system is studied; the impact of dispersed generation on system reliability is evaluated; and finally, the reliability cost/reliability worth issues in the new competitive environment are considered

  19. System reliability analysis with natural language and expert's subjectivity

    International Nuclear Information System (INIS)

    Onisawa, T.

    1996-01-01

    This paper introduces natural language expressions and expert's subjectivity to system reliability analysis. To this end, this paper defines a subjective measure of reliability and presents the method of the system reliability analysis using the measure. The subjective measure of reliability corresponds to natural language expressions of reliability estimation, which is represented by a fuzzy set defined on [0,1]. The presented method deals with the dependence among subsystems and employs parametrized operations of subjective measures of reliability which can reflect expert 's subjectivity towards the analyzed system. The analysis results are also expressed by linguistic terms. Finally this paper gives an example of the system reliability analysis by the presented method

  20. 76 FR 16277 - System Restoration Reliability Standards

    Science.gov (United States)

    2011-03-23

    ... electric system. Blackstart units are essential to restart generation and restore power to the grid in the... Standard EOP-007-0. \\2\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 72 FR... = $5,894,624. Title: Mandatory Reliability Standards for the Bulk-Power System. Action: FERC 725A...

  1. Power supply control system for experimental physical facilities

    International Nuclear Information System (INIS)

    Zelepukin, S.A.; Osipov, Eh.V.; Petrov, V.S.; Sergeev, V.A.; Uglekov, V.Ya.

    1979-01-01

    A multichannel (to 1024 channels) system for control of power supply voltage is descrited. The system consists of an analog commulator, a digital voltmeter and a special controller. The controller serves at the same time as an interface for connecting the system as a ''unit'' of the VECTOR and SUMMA unified electronic systems. The system has been realized for control of the photomultiplier power supply voltage of the MARK multipurpose experimental device (256 channels, the measurement accuracy is 0.2%, the measuring time is 500 ms per point). Software devised for the HP-2100 computer permits automatical comparison of photomultiplier power supply voltages with sample ones in the mode of continuous control of a single voltage or in the mode of programmed selection of voltages to provide the control in arbitrary order or automatic scanning

  2. Reliability of thermal-hydraulic passive safety systems

    International Nuclear Information System (INIS)

    D'Auria, F.; Araneo, D.; Pierro, F.; Galassi, G.

    2014-01-01

    The scholar will be informed of reliability concepts applied to passive system adopted for nuclear reactors. Namely, for classical components and systems the failure concept is associated with malfunction of breaking of hardware. In the case of passive systems the failure is associated with phenomena. A method for studying the reliability of passive systems is discussed and is applied. The paper deals with the description of the REPAS (Reliability Evaluation of Passive Safety System) methodology developed by University of Pisa (UNIPI) and with results from its application. The general objective of the REPAS methodology is to characterize the performance of a passive system in order to increase the confidence toward its operation and to compare the performances of active and passive systems and the performances of different passive systems

  3. The Complex Economic System of Supply Chain Financing

    Science.gov (United States)

    Zhang, Lili; Yan, Guangle

    Supply Chain Financing (SCF) refers to a series of innovative and complicated financial services based on supply chain. The SCF set-up is a complex system, where the supply chain management and Small and Medium Enterprises (SMEs) financing services interpenetrate systematically. This paper establishes the organization structure of SCF System, and presents two financing models respectively, with or without the participation of the third-party logistic provider (3PL). Using Information Economics and Game Theory, the interrelationship among diverse economic sectors is analyzed, and the economic mechanism of development and existent for SCF system is demonstrated. New thoughts and approaches to solve SMEs financing problem are given.

  4. Reliability Electrical Power System of Hospital as Cold Standby System

    Directory of Open Access Journals (Sweden)

    Grabski Franciszek

    2016-07-01

    Full Text Available The probabilistic model of a hospital electrical power system consisting of mains, an emergency power system and the automatic transfer switch with the generator starter are discussed in this paper. The reliability model is semi-Markov process describing two different units renewable cold standby system and switch. The embedded Semi-Markov processes concept is applied for description of the system evolution. Time to failure of the system is represented by a random variable denoting the first passage time of the process from the given state to the subset of states. The appropriate theorems of the Semi-Markov processes theory allow us to evaluate the reliability function and some reliability characteristics.

  5. Optimal Control and Optimization of Stochastic Supply Chain Systems

    CERN Document Server

    Song, Dong-Ping

    2013-01-01

    Optimal Control and Optimization of Stochastic Supply Chain Systems examines its subject in the context of the presence of a variety of uncertainties. Numerous examples with intuitive illustrations and tables are provided, to demonstrate the structural characteristics of the optimal control policies in various stochastic supply chains and to show how to make use of these characteristics to construct easy-to-operate sub-optimal policies.                 In Part I, a general introduction to stochastic supply chain systems is provided. Analytical models for various stochastic supply chain systems are formulated and analysed in Part II. In Part III the structural knowledge of the optimal control policies obtained in Part II is utilized to construct easy-to-operate sub-optimal control policies for various stochastic supply chain systems accordingly. Finally, Part IV discusses the optimisation of threshold-type control policies and their robustness. A key feature of the book is its tying together of ...

  6. JIT supply chain; an investigation through general system theory

    Directory of Open Access Journals (Sweden)

    O P Mishra

    2013-03-01

    Full Text Available This paper explains theoretical approach of the four theories of General system Theory (GST developed by Yourdon (1989 [Yourdon, E. (1989. Modern Structured Analysis. Yourdon Press, Prentice-Hall International, Englewood Cliffs, New Jersey. Senge] while applying it in information technology and subsequently used by caddy (2007 [Caddy I.N., & Helou, M.M. (2007. Supply chains and their management: Application of general systems theory. Journal of Retailing and Consumer Services, 14, 319–327.] in field of supply chain and management. JIT philosophy in core activities of supply chain i.e. procurement, production processes, and logistics are discussed through general system theory. The growing structure of the supply chain poses the implication restrictions and requires a heavy support system, many times a compromise is done while implementing JIT. The study would be useful to understand the general trends generated naturally regarding the adoption of the JIT philosophy in the supply chain.

  7. Energy-Cost Optimisation in Water-Supply System

    OpenAIRE

    Farrukh Mahmood; Haider Ali

    2013-01-01

    Households as well as community water-supply systems for utilisation of underground aquifers are massive consumers of energy. Prevailing energy crisis and focus of the government on demand-side energy policies (i.e., energy conservation) in Pakistan raises need of using energy efficient techniques in almost every aspect of life. This paper analyses performance of community relative to household water-supply system in connection with efficient energy utilisation. Results suggest that total ope...

  8. Systems reliability analysis for the national ignition facility

    International Nuclear Information System (INIS)

    Majumdar, K.C.; Annese, C.E.; MacIntyre, A.T.; Sicherman, A.

    1996-01-01

    A Reliability, Availability and Maintainability (RAM) analysis was initiated for the National Ignition Facility (NIF). The NIF is an inertial confinement fusion research facility designed to achieve controlled thermonuclear reaction; the preferred site for the NIF is the Lawrence Livermore National Laboratory (LLNL). The NIF RAM analysis has three purposes: (1) to allocate top level reliability and availability goals for the systems, (2) to develop an operability model for optimum maintainability, and (3) to determine the achievability of the allocated goals of the RAM parameters for the NIF systems and the facility operation as a whole. An allocation model assigns the reliability and availability goals for front line and support systems by a top-down approach; reliability analysis uses a bottom-up approach to determine the system reliability and availability from component level to system level

  9. The imperative for stronger vaccine supply and logistics systems.

    Science.gov (United States)

    Zaffran, Michel; Vandelaer, Jos; Kristensen, Debra; Melgaard, Bjørn; Yadav, Prashant; Antwi-Agyei, K O; Lasher, Heidi

    2013-04-18

    With the introduction of new vaccines, developing countries are facing serious challenges in their vaccine supply and logistics systems. Storage capacity bottlenecks occur at national, regional, and district levels and system inefficiencies threaten vaccine access, availability, and quality. As countries adopt newer and more expensive vaccines and attempt to reach people at different ages and in new settings, their logistics systems must be strengthened and optimized. As a first step, national governments, donors, and international agencies have crafted a global vision for 2020 vaccine supply and logistics systems with detailed plans of action to achieve five priority objectives. Vaccine products and packaging are designed to meet the needs of developing countries. Immunization supply systems support efficient and effective vaccine delivery. The environmental impact of energy, materials, and processes used in immunization systems is minimized. Immunization information systems enable better and more timely decision-making. Competent and motivated personnel are empowered to handle immunization supply chain issues. Over the next decade, vaccine supply and logistics systems in nearly all developing countries will require significant investments of time and resources from global and national partners, donors, and governments. These investments are critical if we are to reach more people with current and newer vaccines. Copyright © 2012 Elsevier Ltd. All rights reserved.

  10. Operation reliability analysis of independent power plants of gas-transmission system distant production facilities

    Science.gov (United States)

    Piskunov, Maksim V.; Voytkov, Ivan S.; Vysokomornaya, Olga V.; Vysokomorny, Vladimir S.

    2015-01-01

    The new approach was developed to analyze the failure causes in operation of linear facilities independent power supply sources (mini-CHP-plants) of gas-transmission system in Eastern part of Russia. Triggering conditions of ceiling operation substance temperature at condenser output were determined with mathematical simulation use of unsteady heat and mass transfer processes in condenser of mini-CHP-plants. Under these conditions the failure probability in operation of independent power supply sources is increased. Influence of environmental factors (in particular, ambient temperature) as well as output electric capability values of power plant on mini-CHP-plant operation reliability was analyzed. Values of mean time to failure and power plant failure density during operation in different regions of Eastern Siberia and Far East of Russia were received with use of numerical simulation results of heat and mass transfer processes at operation substance condensation.

  11. Reliability of structural systems subject to fatigue

    International Nuclear Information System (INIS)

    Rackwitz, R.

    1984-01-01

    Concepts and computational procedures for the reliability calculation of structural systems subject to fatigue are outlined. Systems are dealt with by approximately computing componential times to first failure. So-called first-order reliability methods are then used to formulate dependencies between componential failures and to evaluate the system failure probability. (Author) [pt

  12. Reliability and diagnostic of modular systems

    Directory of Open Access Journals (Sweden)

    J. Kohlas

    2014-01-01

    Full Text Available Reliability and diagnostic are in general two problems discussed separately. Yet the two problems are in fact closely related to each other. Here, this relation is considered in the simple case of modular systems. We show, how the computation of reliability and diagnostic can efficiently be done within the same Bayesian network induced by the modularity of the structure function of the system.

  13. Risk analysis of critical infrastructures emphasizing electricity supply and interdependencies

    International Nuclear Information System (INIS)

    Kjølle, G.H.; Utne, I.B.; Gjerde, O.

    2012-01-01

    Failures in critical infrastructures can cause major damage to society. Wide-area interruptions (blackouts) in the electricity supply system have severe impacts on societal critical functions and other critical infrastructures, but there is no agreed-upon framework on how to analyze and predict the reliability of electricity supply. Thus, there is a need for an approach to cross-sector risk analyses, which facilitates risk analysis of outages in the electricity supply system and enables investigation of cascading failures and consequences in other infrastructures. This paper presents such an approach, which includes contingency analysis (power flow) and reliability analysis of power systems, as well as use of a cascade diagram for investigating interdependencies. A case study was carried out together with the Emergency Preparedness Group in the city of Oslo, Norway and the network company Hafslund Nett. The case study results highlight the need for cross-sector analyses by showing that the total estimated societal costs are substantially higher when cascading effects and consequences to other infrastructures are taken into account compared to only considering the costs of electricity interruptions as seen by the network company. The approach is a promising starting point for cross-sector risk analysis of electricity supply interruptions and consequences for dependent infrastructures.

  14. Reliability worth assessment of radial systems with distributed generation

    OpenAIRE

    Bellart Llavall, Francesc Xavier

    2010-01-01

    With recent advances in technology, utilities generation (DG) on the distribution systems. Reliability worth is very important in power system planning and operation. Having a DG ensures reli increase the reliability worth. This research project presents the study of a radial distribution system and the impact of placing DG in order to increase the reliability worth. where a DG have to be placed. The reliability improvement is measured by different reliability indices tha...

  15. EXTENDED WARRANTY STRATEGIES FOR ONLINE SHOPPING SUPPLY CHAIN WITH COMPETING SUPPLIERS CONSIDERING COMPONENT RELIABILITY

    Institute of Scientific and Technical Information of China (English)

    Xinghong Qin; Qiang Su; Samuel H.Huang

    2017-01-01

    This article presents the issue of extended warranty and management strategies in a three-echelon competing online shopping supply chain with price-and base warranty period-dependent demand.We employ game theory to develop decision models to explore the interactions between component suppliers and the manufacturer,as well as competition between two component suppliers.Products and extended warranty are sold by an online store,which is the leader in the Stackelberg game.Two scenarios are considered:either the manufacturer offers a prepaid extended warranty to customers or doses not.In each scenario,base warranties are assumed to be bundled with products.Our results show that when the manufacturer's repair costs change in a proper range,providing extended warranty can benefit both the manufacturer and the online store;otherwise,the manufacturer has no incentive to offer the extended warranty.Reducing repair costs,improving component reliability,or shortening the base warranty period allows the manufacturer to realize significantly better value of the extended warranty.High component reliability benefits both the manufacturer and the online store,with the manufacturer reaping more benefit.Extending the length of the base warranty adversely affects profit of the manufacturer and the value of the extended warranty.

  16. Contributions to the fundamental optimization and higher reliability of nuclear reactor complex control systems

    International Nuclear Information System (INIS)

    Tapu, C.

    1979-01-01

    The reference control system automatically adjusted to the reactor state and the reliability analysis of the control systems which survive the first defect with given solution for detecting all kinds of defects in the system with parallel redundancy, supply additional data on the high performance and largely available solutions. The results of the paper have been applied in the following cases: The reference control system automatically adapted to the reactor state has been tested with the VVR-S reactor and was patented. The solutions advanced for period and reactivity monitoring by the numerical technique were worked up during the training in France-CEN-Saclay and have been applied on the Ulysse reactor at INSTN (CERN-Saclay). At the same time, the papers published on these subjects have been cited in ''Revue General d'Electricite (February 1976)'' and in ''MCH/MENT 10 - Materiel Electronique Nucleaire pour tableau de commande et de controle (1976)'' issued by CEA France, as marking a progress in the control of nuclear power plants. The reliability analysis of the control system with parallel redundancy was performed during a specialization in France and on the basis of this analysis, the control system for the high flux reactor in Grenoble was selected. (author)

  17. The reliability of nuclear power plant safety systems

    International Nuclear Information System (INIS)

    Susnik, J.

    1978-01-01

    A criterion was established concerning the protection that nuclear power plant (NPP) safety systems should afford. An estimate of the necessary or adequate reliability of the total complex of safety systems was derived. The acceptable unreliability of auxiliary safety systems is given, provided the reliability built into the specific NPP safety systems (ECCS, Containment) is to be fully utilized. A criterion for the acceptable unreliability of safety (sub)systems which occur in minimum cut sets having three or more components of the analysed fault tree was proposed. A set of input MTBF or MTTF values which fulfil all the set criteria and attain the appropriate overall reliability was derived. The sensitivity of results to input reliability data values was estimated. Numerical reliability evaluations were evaluated by the programs POTI, KOMBI and particularly URSULA, the last being based on Vesely's kinetic fault tree theory. (author)

  18. Reliability model of SNS linac (spallation neutron source-ORNL)

    International Nuclear Information System (INIS)

    Pitigoi, A.; Fernandez, P.

    2015-01-01

    A reliability model of SNS LINAC (Spallation Neutron Source at Oak Ridge National Laboratory) has been developed using risk spectrum reliability analysis software and the analysis of the accelerator system's reliability has been performed. The analysis results have been evaluated by comparing them with the SNS operational data. This paper presents the main results and conclusions focusing on the definition of design weaknesses and provides recommendations to improve reliability of the MYRRHA ( linear accelerator. The reliability results show that the most affected SNS LINAC parts/systems are: 1) SCL (superconducting linac), front-end systems: IS, LEBT (low-energy beam transport line), MEBT (medium-energy beam transport line), diagnostics and controls; 2) RF systems (especially the SCL RF system); 3) power supplies and PS controllers. These results are in line with the records in the SNS logbook. The reliability issue that needs to be enforced in the linac design is the redundancy of the systems, subsystems and components most affected by failures. For compensation purposes, there is a need for intelligent fail-over redundancy implementation in controllers. Enough diagnostics has to be implemented to allow reliable functioning of the redundant solutions and to ensure the compensation function

  19. Comparison of centralized and decentralized energy supply systems

    OpenAIRE

    Pfeifer, Thomas; Fahl, Ulrich; Voß, Alfred

    1991-01-01

    Communal energy programs are often embedded in a conception of a decentralized energy supply system where electricity is produced by a number of smaller power plants. For a comprehensive survey the question arises whether these decentralized systems are more advantageous than centralized systems with regard to the criterions energy consumption, safety of supply, environmental compatibility and economy. In the following, after a definition of the term "decentralized", the present structure of ...

  20. Time domain series system definition and gear set reliability modeling

    International Nuclear Information System (INIS)

    Xie, Liyang; Wu, Ningxiang; Qian, Wenxue

    2016-01-01

    Time-dependent multi-configuration is a typical feature for mechanical systems such as gear trains and chain drives. As a series system, a gear train is distinct from a traditional series system, such as a chain, in load transmission path, system-component relationship, system functioning manner, as well as time-dependent system configuration. Firstly, the present paper defines time-domain series system to which the traditional series system reliability model is not adequate. Then, system specific reliability modeling technique is proposed for gear sets, including component (tooth) and subsystem (tooth-pair) load history description, material priori/posterior strength expression, time-dependent and system specific load-strength interference analysis, as well as statistically dependent failure events treatment. Consequently, several system reliability models are developed for gear sets with different tooth numbers in the scenario of tooth root material ultimate tensile strength failure. The application of the models is discussed in the last part, and the differences between the system specific reliability model and the traditional series system reliability model are illustrated by virtue of several numerical examples. - Highlights: • A new type of series system, i.e. time-domain multi-configuration series system is defined, that is of great significance to reliability modeling. • Multi-level statistical analysis based reliability modeling method is presented for gear transmission system. • Several system specific reliability models are established for gear set reliability estimation. • The differences between the traditional series system reliability model and the new model are illustrated.

  1. Influence Of Inspection Intervals On Mechanical System Reliability

    International Nuclear Information System (INIS)

    Zilberman, B.

    1998-01-01

    In this paper a methodology of reliability analysis of mechanical systems with latent failures is described. Reliability analysis of such systems must include appropriate usage of check intervals for latent failure detection. The methodology suggests, that based on system logic the analyst decides at the beginning if a system can fail actively or latently and propagates this approach through all system levels. All inspections are assumed to be perfect (all failures are detected and repaired and no new failures are introduced as a result of the maintenance). Additional assumptions are that mission time is much smaller, than check intervals and all components have constant failure rates. Analytical expressions for reliability calculates are provided, based on fault tree and Markov modeling techniques (for two and three redundant systems with inspection intervals). The proposed methodology yields more accurate results than are obtained by not using check intervals or using half check interval times. The conventional analysis assuming that at the beginning of each mission system is as new, give an optimistic prediction of system reliability. Some examples of reliability calculations of mechanical systems with latent failures and establishing optimum check intervals are provided

  2. A New Reliability Analysis Model of the Chegongzhuang Heat-Supplying Tunnel Structure Considering the Coupling of Pipeline Thrust and Thermal Effect

    Directory of Open Access Journals (Sweden)

    Jiawen Zhang

    2018-02-01

    Full Text Available Based on the operating Chegongzhuang heat-supplying tunnel in Beijing, the reliability of its lining structure under the action of large thrust and thermal effect is studied. According to the characteristics of a heat-supplying tunnel service, a three-dimensional numerical analysis model was established based on the mechanical tests on the in-situ specimens. The stress and strain of the tunnel structure were obtained before and after the operation. Compared with the field monitoring data, the rationality of the model was verified. After extracting the internal force of the lining structure, the improved method of subset simulation was proposed as the performance function to calculate the reliability of the main control section of the tunnel. In contrast to the traditional calculation method, the analytic relationship between the sample numbers in the subset simulation method and Monte Carlo method was given. The results indicate that the lining structure is greatly influenced by coupling in the range of six meters from the fixed brackets, especially the tunnel floor. The improved subset simulation method can greatly save computation time and improve computational efficiency under the premise of ensuring the accuracy of calculation. It is suitable for the reliability calculation of tunnel engineering, because “the lower the probability, the more efficient the calculation.”

  3. Estimation of reliability of a interleaving PFC boost converter

    Directory of Open Access Journals (Sweden)

    Gulam Amer Sandepudi

    2010-01-01

    Full Text Available Reliability plays an important role in power supplies. For other electronic equipment, a certain failure mode, at least for a part of the total system, can often be employed without serious (critical effects. However, for power supply no such condition can be accepted, since very high demands on its reliability must be achieved. At higher power levels, the continuous conduction mode (CCM boost converter is preferred topology for implementation a front end with PFC. As a result, significant efforts have been made to improve the performance of high boost converter. This paper is one of the efforts for improving the performance of the converter from the reliability point of view. In this paper, interleaving boost power factor correction converter is simulated with single switch in continuous conduction mode (CCM, discontinuous conduction mode (DCM and critical conduction mode (CRM under different output power ratings. Results of the converter are explored from reliability point of view.

  4. Technical and human considerations in establishing quality of supply objectives

    International Nuclear Information System (INIS)

    Fraser, J.C.

    1989-01-01

    The standard adopted for the quality of electrical supply ultimately determines the cost of the supply. Technical considerations prevent the achievement of perfect quality at any cost and high quality is gained usually only at high cost. Customer opinion ultimately determines acceptable quality and cost. However, gaining opinion data which is useful for system design is a task that must account for certain human characteristics which influence the reliability of data obtained from surveys. An overview is given of technical factors which limit the quality of supply and human nature impacts on opinion data. Power generation, generation design criteria, transmission system design criteria and subtransmission and distribution criteria for reliability of supply are discussed. Public opinion of electrical power quality is distorted by several influences. While electricity use is continuous, bills come periodically, and the time discrepancy is likely to inflate the perception of energy cost. Periods with low quality problems become expected as the norm, although to a certain degree memory of poor performance is more persistant than memory of good performance, moderating the effect. Costs customers are willing to bear to provide for improved performance are analyzed. 10 refs., 8 figs., 3 tabs

  5. Reliability planning in distributed electric energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.

    1978-10-01

    The goal of this paper is to develop tools for technology evaluation that address questions involving the economics of large-scale systems. The kind of cost discussed usually involves some dynamic aspect of the energy system. In particular, such properties as flexibility, stability, and resilience are features of entire systems. Special attention must be paid to the question of reliability, i.e., availability on demand. The storage problem and the planning for reliability in utility systems are the subjects of this paper. The introductory chapter addresses preliminary definitions--reliability planning, uncertainty, resilience, and other sensitivities. The study focuses on the contrast between conventional power generation technologies with controllable output and intermittent resources such as wind and solar electric conversion devices. The system studied is a stylized representation of California conditions. Significant differences were found in reliability planning requirements (and therefore costs) for systems dominated by central station plants as opposed to those dominated by intermittent resource technologies. It is argued that existing hydroelectric facilities need re-optimization. These plants provide the only currently existing bulk power storage in electric energy systems. 38 references. (MCW)

  6. Electric power supply and demand 1979 to 1988 for the contiguous United States as projected by the Regional Electric Reliability Councils in their April 1, 1979 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    Savage, N.; Graban, W.

    1979-12-01

    Information concerning bulk electric power supply and demand is summarized and reviewed. Electric-utility power-supply systems are composed of power sources, transmission and distribution facilities, and users of electricity. In the United States there are three such systems of large geographic extent that together cover the entire country. Subjects covered are: energy forecasts, peak demand forecasts, generating-capacity forecasts, purchases and sales of capacity, and transmission. Extensive data are compiled in 17 tables. Information in two appendices includes a general description of the Regional Electric Reliability Councils and US generating capacity as of June 30, 1979. 3 figures, 17 tables.

  7. Reliability analysis of reactor protection systems

    International Nuclear Information System (INIS)

    Alsan, S.

    1976-07-01

    A theoretical mathematical study of reliability is presented and the concepts subsequently defined applied to the study of nuclear reactor safety systems. The theory is applied to investigations of the operational reliability of the Siloe reactor from the point of view of rod drop. A statistical study conducted between 1964 and 1971 demonstrated that most rod drop incidents arose from circumstances associated with experimental equipment (new set-ups). The reliability of the most suitable safety system for some recently developed experimental equipment is discussed. Calculations indicate that if all experimental equipment were equipped with these new systems, only 1.75 rod drop accidents would be expected to occur per year on average. It is suggested that all experimental equipment should be equipped with these new safety systems and tested every 21 days. The reliability of the new safety system currently being studied for the Siloe reactor was also investigated. The following results were obtained: definite failures must be detected immediately as a result of the disturbances produced; the repair time must not exceed a few hours; the equipment must be tested every week. Under such conditions, the rate of accidental rod drops is about 0.013 on average per year. The level of nondefinite failures is less than 10 -6 per hour and the level of nonprotection 1 hour per year. (author)

  8. Distribution System Reliability Analysis for Smart Grid Applications

    Science.gov (United States)

    Aljohani, Tawfiq Masad

    Reliability of power systems is a key aspect in modern power system planning, design, and operation. The ascendance of the smart grid concept has provided high hopes of developing an intelligent network that is capable of being a self-healing grid, offering the ability to overcome the interruption problems that face the utility and cost it tens of millions in repair and loss. To address its reliability concerns, the power utilities and interested parties have spent extensive amount of time and effort to analyze and study the reliability of the generation and transmission sectors of the power grid. Only recently has attention shifted to be focused on improving the reliability of the distribution network, the connection joint between the power providers and the consumers where most of the electricity problems occur. In this work, we will examine the effect of the smart grid applications in improving the reliability of the power distribution networks. The test system used in conducting this thesis is the IEEE 34 node test feeder, released in 2003 by the Distribution System Analysis Subcommittee of the IEEE Power Engineering Society. The objective is to analyze the feeder for the optimal placement of the automatic switching devices and quantify their proper installation based on the performance of the distribution system. The measures will be the changes in the reliability system indices including SAIDI, SAIFI, and EUE. The goal is to design and simulate the effect of the installation of the Distributed Generators (DGs) on the utility's distribution system and measure the potential improvement of its reliability. The software used in this work is DISREL, which is intelligent power distribution software that is developed by General Reliability Co.

  9. CADRIGS--computer aided design reliability interactive graphics system

    International Nuclear Information System (INIS)

    Kwik, R.J.; Polizzi, L.M.; Sticco, S.; Gerrard, P.B.; Yeater, M.L.; Hockenbury, R.W.; Phillips, M.A.

    1982-01-01

    An integrated reliability analysis program combining graphic representation of fault trees, automated data base loadings and reference, and automated construction of reliability code input files was developed. The functional specifications for CADRIGS, the computer aided design reliability interactive graphics system, are presented. Previously developed fault tree segments used in auxiliary feedwater system safety analysis were constructed on CADRIGS and, when combined, yielded results identical to those resulting from manual input to the same reliability codes

  10. Improvements in electric power supply in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Minovskii, Yu.P.; Nabokov, Eh.P.; Savel' ev, G.P.

    1985-01-01

    Reviews measures taken by major coal producing countries to increase output levels. Discusses research carried out into advance design of equipment in FRG, UK, USA and France and proposes establishment of central automatic control of electric power supply system in Soviet mines, improvement in underground power supply equipment, increase in reliability, stabilization of standby capacity in low voltage circuits, maintenance-free electrical equipment, and efficient spare part storage in underground workings. States that introduction of the proposed system (details are given) will ensure that Soviet mines will eventually reach the development level of foreign mines. 2 refs.

  11. The relationship between security of supply and its drivers

    International Nuclear Information System (INIS)

    2007-10-01

    The relationship between security of supply of natural gas in the UK and three possible drivers were considered. The drivers discussed are (1) supply margin, (2) reliability of supply and (3) diversity of supply. The department for Business Enterprise and Regulatory Reform's gas security of supply model may be applied to estimate 'expected energy unserved (EEU)' according to a range of conditions of supply and demand. Supply margin and mix can be varied in the model, as can the reliability of supply sources. The paper describes work exploring the impact on the EEU of changes in these three drivers

  12. Preliminary investigation on reliability assessment of passive safety system

    International Nuclear Information System (INIS)

    Huang Changfan; Kuang Bo

    2012-01-01

    The reliability evaluation of passive safety system plays an important part in probabilistic safety assessment (PSA) of nuclear power plant applying passive safety design, which depends quantitatively on reliabilities of passive safety system. According to the object of reliability assessment of passive safety system, relevant parameters are identified. Then passive system behavior during accident scenarios are studied. A practical example of this method is given for the case of reliability assessment of AP1000 passive heat removal system in loss of normal feedwater accident. Key and design parameters of PRHRS are identified and functional failure criteria are established. Parameter combinations acquired by Latin hyper~ cube sampling (LHS) in possible parametric ranges are input and calculations of uncertainty propagation through RELAP5/MOD3 code are carried out. Based on the calculations, sensitivity assessment on PRHRS functional criteria and reliability evaluation of the system are presented, which might provide further PSA with PRHR system reliability. (authors)

  13. Systems reliability in high risk situations

    International Nuclear Information System (INIS)

    Hunns, D.M.

    1974-12-01

    A summary is given of five papers and the discussion of a seminar promoted by the newly-formed National Centre of Systems Reliability. The topics covered include hazard analysis, reliability assessment, and risk assessment in both nuclear and non-nuclear industries. (U.K.)

  14. System Reliability of Timber Structures with Ductile Behaviour

    DEFF Research Database (Denmark)

    Kirkegaard, Poul Henning; Sørensen, John Dalsgaard; Čizmar, Dean

    2011-01-01

    The present paper considers the evaluation of timber structures with the focus on robustness due to connection ductility. The robustness analysis is based on the structural reliability framework applied to a simplified mechanical system. The structural timber system is depicted as a parallel system....... An evaluation method of the ductile behaviour is introduced. For different ductile behaviours, the system reliability is estimated based on Monte Carlo simulation. A correlation between the strength of the structural elements is introduced. The results indicate that the reliability of a structural timber system...

  15. Reliability Modeling of Wind Turbines

    DEFF Research Database (Denmark)

    Kostandyan, Erik

    Cost reductions for offshore wind turbines are a substantial requirement in order to make offshore wind energy more competitive compared to other energy supply methods. During the 20 – 25 years of wind turbines useful life, Operation & Maintenance costs are typically estimated to be a quarter...... for Operation & Maintenance planning. Concentrating efforts on development of such models, this research is focused on reliability modeling of Wind Turbine critical subsystems (especially the power converter system). For reliability assessment of these components, structural reliability methods are applied...... to one third of the total cost of energy. Reduction of Operation & Maintenance costs will result in significant cost savings and result in cheaper electricity production. Operation & Maintenance processes mainly involve actions related to replacements or repair. Identifying the right times when...

  16. Reliability engineering for nuclear and other high technology systems

    International Nuclear Information System (INIS)

    Lakner, A.A.; Anderson, R.T.

    1985-01-01

    This book is written for the reliability instructor, program manager, system engineer, design engineer, reliability engineer, nuclear regulator, probability risk assessment (PRA) analyst, general manager and others who are involved in system hardware acquisition, design and operation and are concerned with plant safety and operational cost-effectiveness. It provides criteria, guidelines and comprehensive engineering data affecting reliability; it covers the key aspects of system reliability as it relates to conceptual planning, cost tradeoff decisions, specification, contractor selection, design, test and plant acceptance and operation. It treats reliability as an integrated methodology, explicitly describing life cycle management techniques as well as the basic elements of a total hardware development program, including: reliability parameters and design improvement attributes, reliability testing, reliability engineering and control. It describes how these elements can be defined during procurement, and implemented during design and development to yield reliable equipment. (author)

  17. Data concealing of supply chain transactions using the Distributed Trust Backbone

    NARCIS (Netherlands)

    Pruksasri, P.; Berg, J. van den; Hofman, W.J.; Tan, Y.H.

    2014-01-01

    Secure and accurate transactions are vital to any large-scale business system in order to guarantee the reliability of the system to stakeholders in both the public and private sectors. In supply chain systems, however, a variety of information security shortcomings is currently occurring in several

  18. Control of the superconducting magnet power supply for SECRAL

    International Nuclear Information System (INIS)

    Zhou Wenxiong; Wang Yanyu; Zhou Detai; Lu Wang; Feng Yucheng; Su Jianjun

    2014-01-01

    The control of the superconducting magnet power supply (SMPS) is very important for Superconducting Electron Cyclotron Resonance Ion source with Advanced design in Lanzhou (SECRAL). In order to improve the safety and the reliability of the SMPS, a remote control system was designed and implemented. There are four power supplies needed to be controlled with suitable strategy to avoid the quench of the superconducting magnet. These four power supplies are used to supply four superconducting solenoids. Because the value and the changing rates of the current for these four solenoids are different, the power supplies must be operated synchronously to keep the current of the solenoids balanced. In this paper, we provide a detailed description for the control strategy of the four power supplies and the architecture of the hardware and the software. A serial switch is used for protocol conversion between TCP/IP and RS232 in firmware. And the software is implemented using VC++. The system can operate the four power supplies automatically after it is triggered. With the help of the control system, operation of the SMPS gets easier and safer. (authors)

  19. An integrated mine development and supply system

    Energy Technology Data Exchange (ETDEWEB)

    Muguira, T. [Brambles Coal Services, Newcastle, NSW (Australia)

    1998-12-31

    In the face of intense global competition and other business pressures on coal miners, ongoing quality initiatives and continuous process improvements are needed to enhance business performance. By viewing a minesite interms of key processes, rather than departments, and employing innovative technologies and better applying organisational resources, there exists enormous potential to achieve reductions in process cost and time. The paper identifies and selects one critical coal mining process, namely the supply system, to think about how productivity improvements might occur and what changes might be employed to enhance overall system performance. While the supply system is one of few processes existing at a minesite, the paper addresses only the supply process, but includes interaction across traditional interdepartmental boundaries. The paper has been prepared for a wide audience and is based on experience and observation at several underground mines however some of the concepts are a result of dreaming in the face of global competition. 3 refs., 1 tab.

  20. Unattended nuclear systems for local energy supply

    International Nuclear Information System (INIS)

    Lynch, G.F.; Bancroft, A.R.; Hilborn, J.W.; McDougall, D.S.; Ohta, M.M.

    1988-02-01

    This paper describes recent developments in a small nuclear heat and electricity production system - the SLOWPOKE Energy System - that make it possible to locate the system close to the load, and that could have a major impact on local energy supply. The most important unique features arising from these developments are walk-away safety and the ability to operate in an unattended mode. Walk-away safety means that radiological protection is provided by intrinsic characteristics and does not depend on either engineered safety systems or operator intervention. This, in our view, is essential to public acceptance. The capability for unattended operation results from self-regulation; however, the performance can be remotely monitored. The SLOWPOKE Energy System consists of a water-filled pool, operating at atmospheric pressure, which cools and moderates a beryllium-reflected thermal reactor that is fuelled with 100 to 400 kg of low-enriched uranium. The pool water also provides shielding from radioactive materials trapped in the fuel. Heat is drawn from the pool and transferred either to a building hot-water distribution system or to an organic liquid which is converted to vapour to drive a turbine-generator unit. Heating loads between 2 qnd 10 MWt, and electrical loads up to 1 MWe can be satisfied. SLOWPOKE is a dramatic departure from conventional nuclear power reactors. Its nuclear heat source is intrinsically simple, having only one moving part: a solid neutron absorber which is slowly withdrawn from the reactor to balance the fuel burnup. Its power is self-regulated and excessive heat production cannot occur, even for the most severe combinations of system failure. Cooling of the fuel is assured by natural physical processes that do not depend on mechanical components such as pumps. These intrinsic characteristics assure public safety and ultra high reliability

  1. Unattended nuclear systems for local energy supply

    International Nuclear Information System (INIS)

    Lynch, G.F.; Bancroft, A.R.; Hilborn, J.W.; McDougall, D.S.; Ohta, M.M.

    1986-10-01

    This paper describes recent developments in a small nuclear heat and electricity production system - the SLOWPOKE energy system - that make it possible to locate the system close to the load, and that could have a major impact on local energy supply. The most important unique features arising from these developments are walk-away safety and the ability to operate in an unattended mode. Walk-away safety means that radiological protection is provided by intrinsic characteristics and does not depend on either engineered safety systems or operator intervention. This, in our view, is essential to public acceptance. The capability for unattended operation results from self-regulation, however the performance can be remotely monitored. The SLOWPOKE energy system consists of a water-filled pool, operating at atmospheric pressure, which cools and moderates a beryllium-reflected thermal reactor that is fuelled with 100 to 400 kg of low enriched uranium. The pool water also provides shielding from radioactive materials trapped in the fuel. Heat is drawn from the pool and transferred either to a building hot-water distribution system or to an organic liquid which is converted to vapour to drive a turbine-generator unit. Heating loads between 2 and 10 MWt, and electrical loads up to 1 MWe can be satisfied. SLOWPOKE is a dramatic departure from conventional nuclear power reactors. Its nuclear heat source is intrinsically simple, having only one moving part: a solid neutron absorber which is slowly withdrawn from the reactor to balance the fuel burnup. Its power is self-regulated and excessive heat production cannot occur, even for the most severe combinations of system failure. Cooling of the fuel is assured by natural physical processes that do not depend on mechanical components such as pumps. These intrinsic characteristics assure public safety and ultra high reliability. (author)

  2. Reliability payments to generation capacity in electricity markets

    International Nuclear Information System (INIS)

    Olsina, Fernando; Pringles, Rolando; Larisson, Carlos; Garcés, Francisco

    2014-01-01

    Electric power is a critical input to modern economies. Generation adequacy and security of supply in power systems running under competition are currently topics of high concern for consumers, regulators and governments. In a market setting, generation investments and adequacy can only be achieved by an appropriate regulatory framework that sets efficient remuneration to power capacity. Theoretically, energy-only electricity markets are efficient and no additional mechanism is needed. Nonetheless, the energy-only market design suffers from serious drawbacks. Therefore, jointly with the evolution of electricity markets, many remunerating mechanisms for generation capacity have been proposed. Explicit capacity payment was the first remunerating approach implemented and perhaps still the most applied. However, this price-based regulation has been applied no without severe difficulties and criticism. In this paper, a new reliability payment mechanism is envisioned. Capacity of each generating unit is paid according to its effective contribution to overall system reliability. The proposed scheme has many attractive features and preserves the theoretical efficiency properties of energy-only markets. Fairness, incentive compatibility, market power mitigation and settlement rules are investigated in this work. The article also examines the requirements for system data and models in order to implement the proposed capacity mechanism. A numerical example on a real hydrothermal system serves for illustrating the practicability of the proposed approach and the resulting reliability payments to the generation units. - Highlights: • A new approach for remunerating supply reliability provided by generation units is proposed. • The contribution of each generating unit to lessen power shortfalls is determined by simulations. • Efficiency, fairness and incentive compatibility of the proposed reliability payment are assessed

  3. Troubleshooting of signal power supply system for Shanghai metro line 7

    Science.gov (United States)

    Lu, Kaixia; Xiao, Jie

    2018-03-01

    With the rapid development of Urban Rail Transit Signal Technology, the demand of signal power supply system for signal equipment is higher and higher. The signal intelligent power supply panel is the main component of the urban rail traffic signal power supply system. Whether the intelligent power supply panel working or not is directly related to traffic safety. The maintenance of intelligent signal power supply panel is particularly important. Line 7 of Shanghai Metro adopts PMZG Signal Intelligent Power Supply Panel, which is produced by Beijing Jinyujiaxin Polytron Technologies Inc. Maintenance of power supply system mainly includes routine maintenance and troubleshooting. This article will make clear the routine maintenance contents of PMZG Signal Intelligent Power Supply Panel, and put forward the common fault information and troubleshooting methods of PMZG Signal Intelligent Power Supply Panel. In accordance with the steps of fault handling, the faults can be eliminated in the shortest possible time, and PMZG Signal Intelligent Power Supply Panel can be quickly restored to normal working state.

  4. New Industrial Park Energy Supply (NIPES): a method of efficiently supplying energy to a community of industrial users

    International Nuclear Information System (INIS)

    1984-08-01

    The New Industrial Park Energy Supply (NIPES) concept allows the use of coal by small as well as large industrial users. The NIPES concept consists of a system of Energy Supply Stations groups of cogeneration plants) and steam transmission lines that supplies process heat and electricity to multiple existing and/or new users in an industrial park(s) setting. The Energy Supply Stations grow along with the industrial park(s) as new industries are attracted by a reliable reasonably priced energy source. The growth of the Energy Supply Stations over a period of years allows the introduction of new energy sources and technologies as they become established. This report describes the generic NIPES concept and the results of the evaluation of a specific NIPES system for the Lake Charles, Louisiana, area. A ten-year process steam load growth scenario is developed including both new and existing industrial users. During the initial years of the growth scenario, process steam is supplied to the industrial users by several coal-fired plants. Later, as the process steam load develops, a two-unit nuclear plant is integrated into the specific NIPES system. An evaluation is also performed for a NIPES system consisting of all coal-fired plants. The specific NIPES system is compared to: (1) individual user owned oil-fired facilities for existing industrial users; and (2) individual user owned coal-fired facilities for new industrial plants. A financial analysis is performed to determine the total economic advantages associated with the NIPES system: savings in a steam costs for industrial users, potential return on investment for investors

  5. New Industrial Park Energy Supply (NIPES): a method of efficiently supplying energy to a community of industrial users

    Energy Technology Data Exchange (ETDEWEB)

    1984-08-01

    The New Industrial Park Energy Supply (NIPES) concept allows the use of coal by small as well as large industrial users. The NIPES concept consists of a system of Energy Supply Stations groups of cogeneration plants) and steam transmission lines that supplies process heat and electricity to multiple existing and/or new users in an industrial park(s) setting. The Energy Supply Stations grow along with the industrial park(s) as new industries are attracted by a reliable reasonably priced energy source. The growth of the Energy Supply Stations over a period of years allows the introduction of new energy sources and technologies as they become established. This report describes the generic NIPES concept and the results of the evaluation of a specific NIPES system for the Lake Charles, Louisiana, area. A ten-year process steam load growth scenario is developed including both new and existing industrial users. During the initial years of the growth scenario, process steam is supplied to the industrial users by several coal-fired plants. Later, as the process steam load develops, a two-unit nuclear plant is integrated into the specific NIPES system. An evaluation is also performed for a NIPES system consisting of all coal-fired plants. The specific NIPES system is compared to: (1) individual user owned oil-fired facilities for existing industrial users; and (2) individual user owned coal-fired facilities for new industrial plants. A financial analysis is performed to determine the total economic advantages associated with the NIPES system: savings in a steam costs for industrial users, potential return on investment for investors.

  6. Foundations for a time reliability correlation system to quantify human reliability

    International Nuclear Information System (INIS)

    Dougherty, E.M. Jr.; Fragola, J.R.

    1988-01-01

    Time reliability correlations (TRCs) have been used in human reliability analysis (HRA) in conjunction with probabilistic risk assessment (PRA) to quantify post-initiator human failure events. The first TRCs were judgmental but recent data taken from simulators have provided evidence for development of a system of TRCs. This system has the equational form: t = tau R X tau U , where the first factor is the lognormally distributed random variable of successful response time, derived from the simulator data, and the second factor is a unitary lognormal random variable to account for uncertainty in the model. The first random variable is further factored into a median response time and a factor to account for the dominant type of behavior assumed to be involved in the response and a second factor to account for other influences on the reliability of the response

  7. Risk Management in Biopharmaceutical Supply Chains

    OpenAIRE

    Ma, Yao

    2011-01-01

    Biopharmaceutical supply chains present considerable complexity issue for the formulation of optimal plans due to significant uncertainty in the supply chain. The primary goal of biopharmaceutical supply chain planning is to provide reliable supply to patients while coping with various supply chain risks. In chapter 1 first I discuss the key elements and basic characteristics of the biopharmaceutical supply chain . Then I present the major challenges in biopharmaceutical supply chain planning...

  8. Nuclear steam supply system KLT-40 enhanced safety as independent power supply source. Employment prospects

    International Nuclear Information System (INIS)

    Polunichev, V.I.; Sayanov, D.G.; Ardabievsky, A.A.

    1993-01-01

    High quality of KLT-40 nuclear steam supply system (NSSS) providing enhanced safety is attained owing to the development and operation experience of equipments and systems in Soviet nuclear icebreakers. First of all they are the operating nuclear-powered icebreakers open-quotes Arktikaclose quotes, open-quotes Sibirclose quotes, open-quotes Rossiyaclose quotes, open-quotes Sovetsky Soyuzclose quotes, the limited draught icebreakers of joint Soviet-Finnish manufacturing open-quotes Taimyrclose quotes open-quotes Vaigachclose quotes. 30-years trouble-free operation of icebreaker open-quotes Leninclose quotes, the ancestor of nuclear powered fleet, is unprecedented. Operation life of individual equipment items amounts to 107000 hours, that testifies to high reliability and life characteristics of NSSS. Trouble-free operation of the nuclear-powered icebreakers' reactor plants (RPs) exceeded 130 reactor years, that proves high quality of design decisions being underlain in the basis of the KLT-40 NSSS for the lighter-cargo carrier open-quotes Sevmorputclose quotes, which was put into operation into 1988. Besides it testifies to the expediency of KLT-40 NSSS employment as a power source in different power installations. The KLT-40 is a reactor plant with a pwr type reactor. The design is described in detail with diagrams

  9. Load Control System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Trudnowski, Daniel [Montana Tech of the Univ. of Montana, Butte, MT (United States)

    2015-04-03

    This report summarizes the results of the Load Control System Reliability project (DOE Award DE-FC26-06NT42750). The original grant was awarded to Montana Tech April 2006. Follow-on DOE awards and expansions to the project scope occurred August 2007, January 2009, April 2011, and April 2013. In addition to the DOE monies, the project also consisted of matching funds from the states of Montana and Wyoming. Project participants included Montana Tech; the University of Wyoming; Montana State University; NorthWestern Energy, Inc., and MSE. Research focused on two areas: real-time power-system load control methodologies; and, power-system measurement-based stability-assessment operation and control tools. The majority of effort was focused on area 2. Results from the research includes: development of fundamental power-system dynamic concepts, control schemes, and signal-processing algorithms; many papers (including two prize papers) in leading journals and conferences and leadership of IEEE activities; one patent; participation in major actual-system testing in the western North American power system; prototype power-system operation and control software installed and tested at three major North American control centers; and, the incubation of a new commercial-grade operation and control software tool. Work under this grant certainly supported the DOE-OE goals in the area of “Real Time Grid Reliability Management.”

  10. Protection and switching system for the RFX power supply

    International Nuclear Information System (INIS)

    Browning, J.L.; Gray, J.W.; Mace, T.A.; Varley, G.L.

    1986-01-01

    The RFX toroidal field power supply comprises a large 4.8MJ (max) modular capacitor bank and four 14MW AC/DC converter flat-top power supply modules. The high fault level associated with the capacitor banks presents a problem in the design of the switching system, since mistiming could produce large currents in the flat-top supplies. The poloidal circuit consists of four groups of magnetising windings connected in series, each with its own flat-top convertor supply and opening switch transfer system. The flat-top converter supplies are needed when the transfer voltage has fallen from approximately 40kV to 1kV. Solutions to the problem of designing a fault-tolerant system which presents no danger to the flat-top converters are described in the paper. The adopted methods make use of hybrid ignitron/mechanical switches to give the required combination of switching speed and current carrying capacity, together with careful attention to the circuit layout of different switching elements. (author)

  11. Research on reliability management systems for Nuclear Power Plant

    International Nuclear Information System (INIS)

    Maki, Nobuo

    2000-01-01

    Investigation on a reliability management system for Nuclear Power Plants (NPPs) has been performed on national and international archived documents as well as on current status of studies at Idaho National Engineering and Environmental Laboratory (INEEL), US NPPs (McGuire, Seabrook), a French NPP (St. Laurent-des-Eaux), Japan Atomic Energy Research Institute (JAERI), Central Research Institute of Electric Power Industries (CRIEPI), and power plant manufacturers in Japan. As a result of the investigation, the following points were identified: (i) A reliability management system is composed of a maintenance management system to inclusively manage maintenance data, and an anomalies information and reliability data management system to extract data from maintenance results stored in the maintenance management system and construct a reliability database. (ii) The maintenance management system, which is widely-used among NPPs in the US and Europe, is an indispensable system for the increase of maintenance reliability. (iii) Maintenance management methods utilizing reliability data like Reliability Centered Maintenance are applied for NPP maintenance in the US and Europe, and contributing to cost saving. Maintenance templates are effective in the application process. In addition, the following points were proposed on the design of the system: (i) A detailed database on specifications of facilities and components is necessary for the effective use of the system. (ii) A demand database is indispensable for the application of the methods. (iii) Full-time database managers are important to maintain the quality of the reliability data. (author)

  12. A new power supply for superconductive magnetic energy storage system

    International Nuclear Information System (INIS)

    Karady, G.G.; Han, B.M.

    1992-01-01

    In this paper a new power supply for a superconductive magnetic energy storage system, which permits a fast independent regulation of the active and reactive power, is presented. The power supply is built with several units connected in parallel. Each unit consists of a 24-pulse bridge converter, thyristor-switched tap-changing transformer, and thyristor-switched capacitor bank. Its system operation is analyzed by computer simulation and a feasible system realization is shown. A superconductive magnetic energy storage system with the proposed power supply has the capability of leveling the load variation, damping the low-frequency oscillation, and improving the transient stability in the power system. This power supply can be built with commercially available components using well-proven technologies

  13. Lean production in improving supply chain performance through hybrid model SCOR 11.0 - system dynamics

    Science.gov (United States)

    Saleh, Chairul; Fatcha Mubiena, Ghaida; Immawan, Taufiq; Hassan, Azmi

    2016-02-01

    Supply Chain Operation Reference (SCOR) is a method to measure supply chain serving the business process framework, performance indicators and unique technologies to support communication and collaboration among supply chain partners. The objective of this paper is to measure Supply Chain Management performance by using SCOR version 11.0 for production typology of MTS-MTO in Indonesian Batik Industry. This research combines SCOR's model and System Dynamics in order to predict the complex activities on batik industry. The hybrid SCOR-SD could identify the interaction among five attributes with the associated variables simultaneously. The results are obtained after the performance of lean production application is increased and the targets are achieved, even exceeding the target. For reliability attributes that associated with perfect order fulfilment started from 2015 to 2019 respectively are calculated as 80.06%, 103.53%, 105.58%, 93.76%, and 72.17%. Responsiveness attributes associated with the order fulfilment cycle time, respectively 122.45%, 149.10%, 159.26%, 131.53%, and 119.36%. Attributes associated with the total cost of service charge respectively 93.46%, 93.53%, 93.45%, 93.49, and 93.49%. Attributes associated with cash management assets to cash cycle time in a row were 160%, 153%, 146.3%, 150%, and 126.7%. The latter attribute is agility attributes associated with supply chain flexibility upside respectively 100%, 87.2%, 100%, 82%, and 82%.

  14. Reliability evaluation of microgrid considering incentive-based demand response

    Science.gov (United States)

    Huang, Ting-Cheng; Zhang, Yong-Jun

    2017-07-01

    Incentive-based demand response (IBDR) can guide customers to adjust their behaviour of electricity and curtail load actively. Meanwhile, distributed generation (DG) and energy storage system (ESS) can provide time for the implementation of IBDR. The paper focus on the reliability evaluation of microgrid considering IBDR. Firstly, the mechanism of IBDR and its impact on power supply reliability are analysed. Secondly, the IBDR dispatch model considering customer’s comprehensive assessment and the customer response model are developed. Thirdly, the reliability evaluation method considering IBDR based on Monte Carlo simulation is proposed. Finally, the validity of the above models and method is studied through numerical tests on modified RBTS Bus6 test system. Simulation results demonstrated that IBDR can improve the reliability of microgrid.

  15. OPTIMIZATION OF THE RELIABILITY OF AGRICULTURAL CONSUMERS ELECTRICITY DISTRIBUTING AND SUPPLY SYSTEMS

    Directory of Open Access Journals (Sweden)

    Lupushor I.

    2007-12-01

    Full Text Available The problems of the optimization reliability in electrical networks of the different class of voltage have probabilistic nature, they discretely change and depend on the number of factors both definite and indefinite and have importance by selection of electric equipment, graph of development of electrical networks and voltage levels. The definition of the major factors, which have determining significance on their value and speed of their change allow to elaborate methods of their optimization and to elaborate effective methods of their growth limitation in electrical networks with the different class of voltage.

  16. Integral evaluation of energy supply systems at mountain refuges

    Energy Technology Data Exchange (ETDEWEB)

    Aschauer, C. [Univ. of Natural Resources and Applied Life Sciences, Vienna (Austria). Inst. for Chemical and Energy Engineering; Steinbacher, G. [Steinbacher and Steinbacher Civil Engineering Inc. (Austria); Weber, P. [DAV-Deutscher Alpenverein e.V. (Germany). Bundesgeschaeftsstelle; Deubler, Hubert

    2010-07-01

    Most of the mountain refuges scattered over the Alps (more than 1500) are not connected to public infrastructure, requiring decentralized supply and disposal and are therefore called island systems. The increasing number of guests goes along with a higher demand for comport and thus puts pressure on available resources. There are numerous challenges like remoteness, transport, low temperatures, seasonal operation and climate change to be faced. Furthermore, the supply and disposal system of an alpine hut has to merge different interests of the alpine associations, refuge operators, legal authorities and the alpine tourists. Therefore the respective infracstructure has to be managed as an overall-self-contained system. Energy supply is the central issue showing complex interaction with water supply, wastewater treatment and waste disposal. Many problems according to planning, decision-making, construction and operation concerning alpine infrastructure are reported. However detailed information on experiences made in these fields is missing at an international level so far. To correct this lack of data, the German Alpine Association (DAV) initiated the project ''Integral Evaluation of Supply and Disposal Systems of Mountain Refuges, IEVEBS'' in 2006, inviting all stakeholders (Alpine Associations, Legal Authorities, Planners, and Researchers) to participate. Additionally to the final project report which contains a detailed description and evaluation of the supply systems, guidelines will be elaborated in 2010 for planning, implementation and operation, all applicable at an international level. (orig.)

  17. Technical report on dc power supplies in nuclear power plants

    International Nuclear Information System (INIS)

    1977-06-01

    Emergency electrical power supplies, both a.c. and d.c. for nuclear power plants are important to safety. For this reason, the electric power systems for operating nuclear plants and those plants under licensing review have been required to provide a high degree of reliability. It is this high reliability that provides confidence that sufficient safety margin exists against loss of all d.c. power for extended periods of time to allow an orderly examination of safety issues, such as this. However, because of the importance of the a.c. and d.c. power systems, the staff has been expending effort to review the reliability of these systems and shall continue to do so in the future

  18. MODEL BASED BIOMASS SYSTEM DESIGN OF FEEDSTOCK SUPPLY SYSTEMS FOR BIOENERGY PRODUCTION

    Energy Technology Data Exchange (ETDEWEB)

    David J. Muth, Jr.; Jacob J. Jacobson; Kenneth M. Bryden

    2013-08-01

    Engineering feedstock supply systems that deliver affordable, high-quality biomass remains a challenge for the emerging bioenergy industry. Cellulosic biomass is geographically distributed and has diverse physical and chemical properties. Because of this feedstock supply systems that deliver cellulosic biomass resources to biorefineries require integration of a broad set of engineered unit operations. These unit operations include harvest and collection, storage, preprocessing, and transportation processes. Design decisions for each feedstock supply system unit operation impact the engineering design and performance of the other system elements. These interdependencies are further complicated by spatial and temporal variances such as climate conditions and biomass characteristics. This paper develops an integrated model that couples a SQL-based data management engine and systems dynamics models to design and evaluate biomass feedstock supply systems. The integrated model, called the Biomass Logistics Model (BLM), includes a suite of databases that provide 1) engineering performance data for hundreds of equipment systems, 2) spatially explicit labor cost datasets, and 3) local tax and regulation data. The BLM analytic engine is built in the systems dynamics software package PowersimTM. The BLM is designed to work with thermochemical and biochemical based biofuel conversion platforms and accommodates a range of cellulosic biomass types (i.e., herbaceous residues, short- rotation woody and herbaceous energy crops, woody residues, algae, etc.). The BLM simulates the flow of biomass through the entire supply chain, tracking changes in feedstock characteristics (i.e., moisture content, dry matter, ash content, and dry bulk density) as influenced by the various operations in the supply chain. By accounting for all of the equipment that comes into contact with biomass from the point of harvest to the throat of the conversion facility and the change in characteristics, the

  19. Reliability-based decision making for selection of ready-mix concrete supply using stochastic superiority and inferiority ranking method

    International Nuclear Information System (INIS)

    Chou, Jui-Sheng; Ongkowijoyo, Citra Satria

    2015-01-01

    Corporate competitiveness is heavily influenced by the information acquired, processed, utilized and transferred by professional staff involved in the supply chain. This paper develops a decision aid for selecting on-site ready-mix concrete (RMC) unloading type in decision making situations involving multiple stakeholders and evaluation criteria. The uncertainty of criteria weights set by expert judgment can be transformed in random ways based on the probabilistic virtual-scale method within a prioritization matrix. The ranking is performed by grey relational grade systems considering stochastic criteria weight based on individual preference. Application of the decision aiding model in actual RMC case confirms that the method provides a robust and effective tool for facilitating decision making under uncertainty. - Highlights: • This study models decision aiding method to assess ready-mix concrete unloading type. • Applying Monte Carlo simulation to virtual-scale method achieves a reliable process. • Individual preference ranking method enhances the quality of global decision making. • Robust stochastic superiority and inferiority ranking obtains reasonable results

  20. A computational Bayesian approach to dependency assessment in system reliability

    International Nuclear Information System (INIS)

    Yontay, Petek; Pan, Rong

    2016-01-01

    Due to the increasing complexity of engineered products, it is of great importance to develop a tool to assess reliability dependencies among components and systems under the uncertainty of system reliability structure. In this paper, a Bayesian network approach is proposed for evaluating the conditional probability of failure within a complex system, using a multilevel system configuration. Coupling with Bayesian inference, the posterior distributions of these conditional probabilities can be estimated by combining failure information and expert opinions at both system and component levels. Three data scenarios are considered in this study, and they demonstrate that, with the quantification of the stochastic relationship of reliability within a system, the dependency structure in system reliability can be gradually revealed by the data collected at different system levels. - Highlights: • A Bayesian network representation of system reliability is presented. • Bayesian inference methods for assessing dependencies in system reliability are developed. • Complete and incomplete data scenarios are discussed. • The proposed approach is able to integrate reliability information from multiple sources at multiple levels of the system.

  1. Highly reliable electro-hydraulic control system

    International Nuclear Information System (INIS)

    Mande, Morima; Hiyama, Hiroshi; Takahashi, Makoto

    1984-01-01

    The unscheduled shutdown of nuclear power stations disturbs power system, and exerts large influence on power generation cost due to the lowering of capacity ratio; therefore, high reliability is required for the control system of nuclear power stations. Toshiba Corp. has exerted effort to improve the reliability of the control system of power stations, and in this report, the electro-hydraulic control system for the turbines of nuclear power stations is described. The main functions of the electro-hydraulic control system are the control of main steam pressure with steam regulation valves and turbine bypass valves, the control of turbine speed and load, the prevention of turbine overspeed, the protection of turbines and so on. The system is composed of pressure sensors and a speed sensor, the control board containing the electronic circuits for control computation and protective sequence, the oil cylinders, servo valves and opening detectors of the valves for control, a high pressure oil hydraulic machine and piping, the operating panel and so on. The main features are the adoption of tripling intermediate value selection method, the multiplying of protection sensors and the adoption of 2 out of 3 trip logic, the multiplying of power sources, the improvement of the reliability of electronic circuit hardware and oil hydraulic system. (Kako, I.)

  2. Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques

    International Nuclear Information System (INIS)

    Ding, Yi; Wang, Peng; Goel, Lalit; Billinton, Roy; Karki, Rajesh

    2007-01-01

    This paper presents a technique to evaluate reliability of a restructured power system with a bilateral market. The proposed technique is based on the combination of the reliability network equivalent and pseudo-sequential simulation approaches. The reliability network equivalent techniques have been implemented in the Monte Carlo simulation procedure to reduce the computational burden of the analysis. Pseudo-sequential simulation has been used to increase the computational efficiency of the non-sequential simulation method and to model the chronological aspects of market trading and system operation. Multi-state Markov models for generation and transmission systems are proposed and implemented in the simulation. A new load shedding scheme is proposed during generation inadequacy and network congestion to minimize the load curtailment. The IEEE reliability test system (RTS) is used to illustrate the technique. (author)

  3. Climate and water resource change impacts and adaptation potential for US power supply

    Science.gov (United States)

    Miara, Ariel; Macknick, Jordan E.; Vörösmarty, Charles J.; Tidwell, Vincent C.; Newmark, Robin; Fekete, Balazs

    2017-11-01

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptation strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. Climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.

  4. FUNDAMENTALS OF RELIABILITY OF ELECTRIC POWER SYSTEM AND EQUIPMENT

    OpenAIRE

    Engr. Anumaka; Michael Chukwukadibia

    2011-01-01

    Today, the electric power system consists of complex interconnected network which are prone to different problems that militates against the reliability of the power system. Inadequate reliability in the power system causes problems such as high failure rate of power system installations and consumer equipment, transient and intransient faults, symmetrical faults etc. This paper provides an extensive review of the powers system and equipment reliability and related failure patterns in equipment.

  5. Reliability analysis of Angra I safety systems

    International Nuclear Information System (INIS)

    Oliveira, L.F.S. de; Soto, J.B.; Maciel, C.C.; Gibelli, S.M.O.; Fleming, P.V.; Arrieta, L.A.

    1980-07-01

    An extensive reliability analysis of some safety systems of Angra I, are presented. The fault tree technique, which has been successfully used in most reliability studies of nuclear safety systems performed to date is employed. Results of a quantitative determination of the unvailability of the accumulator and the containment spray injection systems are presented. These results are also compared to those reported in WASH-1400. (E.G.) [pt

  6. The upgraded PSI application in the BEPCⅡ power supply control system

    International Nuclear Information System (INIS)

    Li Jiangqi; Wang Xiaoli; Wang Chunhong; Liu Jia

    2011-01-01

    There are about 460 magnet power supplies in the two rings and the transport lines of the BEPCⅡ which are controlled by the power supply controller and the power supply interface. An upgraded Power Supply Interface (PSI-Ⅱ) was developed for replacing the old one in the power supply control system of the BEPCⅡ. It will firstly describe feature of the PSI-Ⅱ and difference from the PSI. Then, discuss performance test of the PSI-Ⅱ well as its application in the power supply control system. (authors)

  7. A simple levitation system using wireless power supply system and Lorentz force

    International Nuclear Information System (INIS)

    Oka, Koichi; Tanaka, Masako

    2016-01-01

    A new type of magnetic levitation mechanism has been proposed. The feature of this mechanism is using wireless power supply system and Lorentz forces for levitation. The stability of levitation is performed by passive control by magnetic flux configuration between permanent magnets and active control of electromagnets. In this paper, the concept of levitation mechanism is introduced, FEM analyses for levitation force and wireless power supply performance is examined. In concept two types of levitation systems which are different on the point of active control directions are introduced. In FEM analyses, the required current for levitation and the directions of generating forces are calculated. In the study of wireless power supply system, the required voltage for the levitation is expected. Finally the feasibility of the proposed levitation system will be verified. (paper)

  8. Software engineering practices for control system reliability

    International Nuclear Information System (INIS)

    S. K. Schaffner; K. S White

    1999-01-01

    This paper will discuss software engineering practices used to improve Control System reliability. The authors begin with a brief discussion of the Software Engineering Institute's Capability Maturity Model (CMM) which is a framework for evaluating and improving key practices used to enhance software development and maintenance capabilities. The software engineering processes developed and used by the Controls Group at the Thomas Jefferson National Accelerator Facility (Jefferson Lab), using the Experimental Physics and Industrial Control System (EPICS) for accelerator control, are described. Examples are given of how their procedures have been used to minimized control system downtime and improve reliability. While their examples are primarily drawn from their experience with EPICS, these practices are equally applicable to any control system. Specific issues addressed include resource allocation, developing reliable software lifecycle processes and risk management

  9. Operating experience feedback on lose of offsite power supply for nuclear power plant

    International Nuclear Information System (INIS)

    Jiao Feng; Hou Qinmai; Che Shuwei

    2013-01-01

    The function of the service power system of a nuclear power plant is to provide safe and reliable power supply for the nuclear power plant facilities. The safety of nuclear power plant power supply is essential for nuclear safety. The serious accident of Fukushima Daiichi nuclear power plant occurred due to loss of service power and the ultimate heat sink. The service power system has two independent offsite power supplies as working power and auxiliary power. This article collected events of loss of offsite power supply in operating nuclear power plants at home and abroad, and analyzed the plant status and cause of loss of offsite power supply events, and proposed improvement measures for dealing with loss of offsite power supply. (authors)

  10. Telecommunications system reliability engineering theory and practice

    CERN Document Server

    Ayers, Mark L

    2012-01-01

    "Increasing system complexity require new, more sophisticated tools for system modeling and metric calculation. Bringing the field up to date, this book provides telecommunications engineers with practical tools for analyzing, calculating, and reporting availability, reliability, and maintainability metrics. It gives the background in system reliability theory and covers in-depth applications in fiber optic networks, microwave networks, satellite networks, power systems, and facilities management. Computer programming tools for simulating the approaches presented, using the Matlab software suite, are also provided"

  11. Reliability and cost evaluation of small isolated power systems containing photovoltaic and wind energy

    Science.gov (United States)

    Karki, Rajesh

    Renewable energy application in electric power systems is growing rapidly worldwide due to enhanced public concerns for adverse environmental impacts and escalation in energy costs associated with the use of conventional energy sources. Photovoltaics and wind energy sources are being increasingly recognized as cost effective generation sources. A comprehensive evaluation of reliability and cost is required to analyze the actual benefits of utilizing these energy sources. The reliability aspects of utilizing renewable energy sources have largely been ignored in the past due the relatively insignificant contribution of these sources in major power systems, and consequently due to the lack of appropriate techniques. Renewable energy sources have the potential to play a significant role in the electrical energy requirements of small isolated power systems which are primarily supplied by costly diesel fuel. A relatively high renewable energy penetration can significantly reduce the system fuel costs but can also have considerable impact on the system reliability. Small isolated systems routinely plan their generating facilities using deterministic adequacy methods that cannot incorporate the highly erratic behavior of renewable energy sources. The utilization of a single probabilistic risk index has not been generally accepted in small isolated system evaluation despite its utilization in most large power utilities. Deterministic and probabilistic techniques are combined in this thesis using a system well-being approach to provide useful adequacy indices for small isolated systems that include renewable energy. This thesis presents an evaluation model for small isolated systems containing renewable energy sources by integrating simulation models that generate appropriate atmospheric data, evaluate chronological renewable power outputs and combine total available energy and load to provide useful system indices. A software tool SIPSREL+ has been developed which generates

  12. City gas supply management system. Toshi gas kyokyu kanri system

    Energy Technology Data Exchange (ETDEWEB)

    Ota, S [Tokyo Gas Co. Ltd., Tokyo (Japan)

    1991-07-05

    Supply and control system of city gas (about 90% is LNG) at Tokyo Gas Company is summarized. The LNG is delivered from the high pressure, A-middle pressure and B-middle pressure stations through the low pressure governors at about 3,000 locations to the low-pressure conduit networks. The information system department uses a large-size general purpose IBM computer as a host computer, control computers at each station, and communication networks consisted mainly of the in-house wireless networks. The trunk lines are all looped, and the important facilities are dualized. Characteristic functions include the supply prediction, which takes into account the past supply and ambient temperature records, a day of the week for a particular date, and demand fluctuation trends; adjustments of each holder based on the prediction and restrictions; and piping network simulation to decide gas manufacturing patterns, and determine reasonability of local construction of complicated conduits. The monitoring and control system as the central nerve includes a quick block-wide operation at an accident from earthquake and the like to prevent wide area disasters. 8 figs., 1 tab.

  13. Reliability Modeling of Electromechanical System with Meta-Action Chain Methodology

    Directory of Open Access Journals (Sweden)

    Genbao Zhang

    2018-01-01

    Full Text Available To establish a more flexible and accurate reliability model, the reliability modeling and solving algorithm based on the meta-action chain thought are used in this thesis. Instead of estimating the reliability of the whole system only in the standard operating mode, this dissertation adopts the structure chain and the operating action chain for the system reliability modeling. The failure information and structure information for each component are integrated into the model to overcome the given factors applied in the traditional modeling. In the industrial application, there may be different operating modes for a multicomponent system. The meta-action chain methodology can estimate the system reliability under different operating modes by modeling the components with varieties of failure sensitivities. This approach has been identified by computing some electromechanical system cases. The results indicate that the process could improve the system reliability estimation. It is an effective tool to solve the reliability estimation problem in the system under various operating modes.

  14. Leaks in the internal water supply piping systems

    OpenAIRE

    Orlov Evgeniy Vladimirovich; Komarov Anatoliy Sergeevich; Mel’nikov Fedor Alekseevich; Serov Aleksandr Evgen’evich

    2015-01-01

    Great water losses in the internal plumbing of a building lead to the waste of money for a fence, purification and supply of water volumes in excess. This does not support the concept of water conservation and resource saving lying today in the basis of any building’s construction having plumbing. Leakage means unplanned of water losses systems in domestic water supply systems (hot or cold) as a result of impaired integrity, complicating the operation of a system and leading to high costs of ...

  15. Heroic Reliability Improvement in Manned Space Systems

    Science.gov (United States)

    Jones, Harry W.

    2017-01-01

    System reliability can be significantly improved by a strong continued effort to identify and remove all the causes of actual failures. Newly designed systems often have unexpected high failure rates which can be reduced by successive design improvements until the final operational system has an acceptable failure rate. There are many causes of failures and many ways to remove them. New systems may have poor specifications, design errors, or mistaken operations concepts. Correcting unexpected problems as they occur can produce large early gains in reliability. Improved technology in materials, components, and design approaches can increase reliability. The reliability growth is achieved by repeatedly operating the system until it fails, identifying the failure cause, and fixing the problem. The failure rate reduction that can be obtained depends on the number and the failure rates of the correctable failures. Under the strong assumption that the failure causes can be removed, the decline in overall failure rate can be predicted. If a failure occurs at the rate of lambda per unit time, the expected time before the failure occurs and can be corrected is 1/lambda, the Mean Time Before Failure (MTBF). Finding and fixing a less frequent failure with the rate of lambda/2 per unit time requires twice as long, time of 1/(2 lambda). Cutting the failure rate in half requires doubling the test and redesign time and finding and eliminating the failure causes.Reducing the failure rate significantly requires a heroic reliability improvement effort.

  16. Reliability analysis of water distribution systems under uncertainty

    International Nuclear Information System (INIS)

    Kansal, M.L.; Kumar, Arun; Sharma, P.B.

    1995-01-01

    In most of the developing countries, the Water Distribution Networks (WDN) are of intermittent type because of the shortage of safe drinking water. Failure of a pipeline(s) in such cases will cause not only the fall in one or more nodal heads but also the poor connectivity of source with various demand nodes of the system. Most of the previous works have used the two-step algorithm based on pathset or cutset approach for connectivity analysis. The computations become more cumbersome when connectivity of all demand nodes taken together with that of supply is carried out. In the present paper, network connectivity based on the concept of Appended Spanning Tree (AST) is suggested to compute global network connectivity which is defined as the probability of the source node being connected with all the demand nodes simultaneously. The concept of AST has distinct advantages as it attacks the problem directly rather than in an indirect way as most of the studies so far have done. Since the water distribution system is a repairable one, a general expression for pipeline avialability using the failure/repair rate is considered. Furthermore, the sensitivity of global reliability estimates due to the likely error in the estimation of failure/repair rates of various pipelines is also studied

  17. Multiplicity in public health supply systems: a learning agenda.

    Science.gov (United States)

    Bornbusch, Alan; Bates, James

    2013-08-01

    Supply chain integration-merging products for health programs into a single supply chain-tends to be the dominant model in health sector reform. However, multiplicity in a supply system may be justified as a risk management strategy that can better ensure product availability, advance specific health program objectives, and increase efficiency.

  18. Supply Chain Collaboration Roles of Interorganizational Systems, Trust, and Collaborative Culture

    CERN Document Server

    Cao, Mei

    2013-01-01

    To survive and thrive in the competition, firms have strived to achieve greater supply chain collaboration to leverage the resources and knowledge of suppliers and customers.  Internet based technologies, particularly interorganizational systems, further extend the firms’ opportunities to strengthen their supply chain partnerships and share real-time information to optimize their operations.  Supply Chain Collaboration: Roles of Interorganizational Systems, Trust, and Collaborative Culture explores the nature and characteristics, antecedents, and consequences of supply chain collaboration from multiple theoretical perspectives.  Supply Chain Collaboration: Roles of Interorganizational Systems, Trust, and Collaborative Culture conceptualizes supply chain collaboration as seven interconnecting elements including information sharing, incentive alignment, goal congruence, decision synchronization, resource sharing, as well as communication and joint knowledge creation. These seven components define the occur...

  19. Addressing the reliability issues of intelligent well systems

    International Nuclear Information System (INIS)

    Drakeley, Brian; Douglas, Neil

    2000-01-01

    New Technology receives its fair share of 'risk aversion' both in good and not so good economic times from oil and gas operators evaluating application opportunities. This paper presents details of a strategy developed and implemented to bring to market an Intelligent Well system designed from day one to maximize system reliability, while offering the customer a high degree of choice in system functionality. A team of engineers and scientists skilled in all aspects of Reliability Analysis and Assessment analyzed the Intelligent Well system under development, gathered reliability performance data from other sources and using various analytical techniques developed matrices of system survival probability estimates for various scenarios. Interaction with the system and design engineers has been an on-going process as designs are modified to maximize reliability predictions and extensive qualification test programs developed from the component to the overall system level. The techniques used in the development project will be presented. A comparative model now exists that facilitates the evaluation of future design alternative considerations and also contains databases that can be readily updated with actual field data etc. (author)

  20. Reliability evaluation of deregulated electric power systems for planning applications

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A.M.; Jafari, A.; Fotuhi-Firuzabad, M.

    2008-01-01

    In a deregulated electric power utility industry in which a competitive electricity market can influence system reliability, market risks cannot be ignored. This paper (1) proposes an analytical probabilistic model for reliability evaluation of competitive electricity markets and (2) develops a methodology for incorporating the market reliability problem into HLII reliability studies. A Markov state space diagram is employed to evaluate the market reliability. Since the market is a continuously operated system, the concept of absorbing states is applied to it in order to evaluate the reliability. The market states are identified by using market performance indices and the transition rates are calculated by using historical data. The key point in the proposed method is the concept that the reliability level of a restructured electric power system can be calculated using the availability of the composite power system (HLII) and the reliability of the electricity market. Two case studies are carried out over Roy Billinton Test System (RBTS) to illustrate interesting features of the proposed methodology

  1. Design for Reliability in Renewable Energy Systems

    DEFF Research Database (Denmark)

    Blaabjerg, Frede; Zhou, Dao; Sangwongwanich, Ariya

    2017-01-01

    Power electronics are widely used in renewable energy systems to achieve lower cost of energy, higher efficiency and high power density. At the same time, the high reliability of the power electronics products is demanded, in order to reduce the failure rates and ensure cost-effective operation...... of the renewable energy systems. This paper thus describes the basic concepts used in reliability engineering, and presents the status and future trends of Design for Reliability (DfR) in power electronics, which is currently undergoing a paradigm shift to a physics-of-failure approach. Two case studies of a 2 MW...

  2. Ultra-Reliable Communication in 5G Wireless Systems

    DEFF Research Database (Denmark)

    Popovski, Petar

    2014-01-01

    —Wireless 5G systems will not only be “4G, but faster”. One of the novel features discussed in relation to 5G is Ultra-Reliable Communication (URC), an operation mode not present in today’s wireless systems. URC refers to provision of certain level of communication service almost 100 % of the time....... Example URC applications include reliable cloud connectivity, critical connections for industrial automation and reliable wireless coordination among vehicles. This paper puts forward a systematic view on URC in 5G wireless systems. It starts by analyzing the fundamental mechanisms that constitute......-term URC (URC-S). The second dimension is represented by the type of reliability impairment that can affect the communication reliability in a given scenario. The main objective of this paper is to create the context for defining and solving the new engineering problems posed by URC in 5G....

  3. Business Intelligence tools as an element of information supply system

    Directory of Open Access Journals (Sweden)

    Agnieszka Szmelter

    2013-12-01

    Full Text Available This paper aims to present theBusiness Intelligence toolsas an element improvingflow of information withinthe management information systemand as atool to facilitate theachieving the objectives ofinformation supply system.In the firstpart of the paperthe author presents the issuesrelatedto the specific character of information as a kind of resource and functioning ofthe information supply systemin the enterprise. The secondpart of the articleincludethe characteristics ofBusiness Intelligence systems. The thirdpart deals withthe impact ofBusiness Intelligence toolsto the ongoingactivities ofinformation supply system.

  4. A simple, robust and reliable wind diesel concept for remote power supply

    DEFF Research Database (Denmark)

    Lundsager, P.; Bindner, H.

    1994-01-01

    The paper introduces a Wind Diesel concept suitable for remote communities, the 'Simple, Robust and Reliable Concept' developed at Riso. All components are standard components, the system is self regulating using the component controllers and there is no power electronics. The paper documents...

  5. 77 FR 7526 - Interpretation of Protection System Reliability Standard

    Science.gov (United States)

    2012-02-13

    ... Federal Power Act (FPA) requires a Commission-certified Electric Reliability Organization (ERO) to develop.... Cir. 2009). \\8\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats... a person that is ``directly and materially affected'' by Bulk-Power System reliability may request...

  6. Reliability analysis in interdependent smart grid systems

    Science.gov (United States)

    Peng, Hao; Kan, Zhe; Zhao, Dandan; Han, Jianmin; Lu, Jianfeng; Hu, Zhaolong

    2018-06-01

    Complex network theory is a useful way to study many real complex systems. In this paper, a reliability analysis model based on complex network theory is introduced in interdependent smart grid systems. In this paper, we focus on understanding the structure of smart grid systems and studying the underlying network model, their interactions, and relationships and how cascading failures occur in the interdependent smart grid systems. We propose a practical model for interdependent smart grid systems using complex theory. Besides, based on percolation theory, we also study the effect of cascading failures effect and reveal detailed mathematical analysis of failure propagation in such systems. We analyze the reliability of our proposed model caused by random attacks or failures by calculating the size of giant functioning components in interdependent smart grid systems. Our simulation results also show that there exists a threshold for the proportion of faulty nodes, beyond which the smart grid systems collapse. Also we determine the critical values for different system parameters. In this way, the reliability analysis model based on complex network theory can be effectively utilized for anti-attack and protection purposes in interdependent smart grid systems.

  7. Evaluation of Stock Management Strategies Reliability at Dependent Demand

    Directory of Open Access Journals (Sweden)

    Lukinskiy Valery

    2017-03-01

    Full Text Available For efficiently increasing the logistic systems, the core specialists’ attention has to be directed to reducing costs and increasing supply chains reliability. A decent attention to costs reduction has already been paid, so it can be stated that in this way there is a significant progress. But the problem of reliability evaluation is still insufficiently explored, particularly, in such an important sphere as inventory management at the dependent demand.

  8. Endocrine disrupting compounds in drinking water supply system and human health risk implication.

    Science.gov (United States)

    Wee, Sze Yee; Aris, Ahmad Zaharin

    2017-09-01

    To date, experimental and epidemiological evidence of endocrine disrupting compounds (EDCs) adversely affecting human and animal populations has been widely debated. Notably, human health risk assessment is required for risk mitigation. The lack of human health risk assessment and management may thus unreliably regulate the quality of water resources and efficiency of treatment processes. Therefore, drinking water supply systems (DWSSs) may be still unwarranted in assuring safe access to potable drinking water. Drinking water supply, such as tap water, is an additional and crucial route of human exposure to the health risks associated with EDCs. A holistic system, incorporating continuous research in DWSS monitoring and management using multi-barrier approach, is proposed as a preventive measure to reduce human exposure to the risks associated with EDCs through drinking water consumption. The occurrence of EDCs in DWSSs and corresponding human health risk implications are analyzed using the Needs, Approaches, Benefits, and Challenges (NABC) method. Therefore, this review may act as a supportive tool in protecting human health and environmental quality from EDCs, which is essential for decision-making regarding environmental monitoring and management purposes. Subsequently, the public could have sustainable access to safer and more reliable drinking water. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Urban community perception towards intermittent water supply system.

    Science.gov (United States)

    Joshi, M W; Talkhande, A V; Andey, S P; Kelkar, P S

    2002-04-01

    While evaluating intermittent and continuous water supply systems, consumers opinion survey was undertaken for critical appraisal of both modes of operation. With the help of a pre-designed set of questions relating to various aspects of water supply and the opinion of consumers regarding degree of service, a house to house survey was conducted in the study area of Ghaziabad and Jaipur. The consumer opinion survey clearly indicated a satisfactory degree of service wherever adequate quantity of water was made available irrespective of the mode of water supply. Number of complaints regarding quality of water supplied, timings of supply, low pressures and breakdowns in supply were reported during intermittent water supply. Every family stored water for drinking and other uses. Most of the families discard drinking water once the fresh water supply is resumed next day. Discarded drinking water is usually used in kitchen for washing and gardening. Storage for other purposes depends on economic status and availability of other sources like open dug well in the house. While most of the respondents had no complaints on water tariff, all of them were in favour of continuous water supply.

  10. The contribution of instrumentation and control software to system reliability

    International Nuclear Information System (INIS)

    Fryer, M.O.

    1984-01-01

    Advanced instrumentation and control systems are usually implemented using computers that monitor the instrumentation and issue commands to control elements. The control commands are based on instrument readings and software control logic. The reliability of the total system will be affected by the software design. When comparing software designs, an evaluation of how each design can contribute to the reliability of the system is desirable. Unfortunately, the science of reliability assessment of combined hardware and software systems is in its infancy. Reliability assessment of combined hardware/software systems is often based on over-simplified assumptions about software behavior. A new method of reliability assessment of combined software/hardware systems is presented. The method is based on a procedure called fault tree analysis which determines how component failures can contribute to system failure. Fault tree analysis is a well developed method for reliability assessment of hardware systems and produces quantitative estimates of failure probability based on component failure rates. It is shown how software control logic can be mapped into a fault tree that depicts both software and hardware contributions to system failure. The new method is important because it provides a way for quantitatively evaluating the reliability contribution of software designs. In many applications, this can help guide designers in producing safer and more reliable systems. An application to the nuclear power research industry is discussed

  11. Relativity evaluation of reliability on operation in nuclear power plant

    International Nuclear Information System (INIS)

    Inata, Takashi

    1987-01-01

    The report presents a quantitative method for evaluating the reliability of operations conducted in nuclear power plants. The quantitative reliability evaluation method is based on the 'detailed block diagram analysis (De-BDA)'. All units of a series of operations are separately displayed for each block and combined sequentially. Then, calculation is performed to evaluate the reliability. Basically, De-BDA calculation is made for pairs of operation labels, which are connected in parallel or in series at different subordination levels. The applicability of the De-BDA method is demonstrated by carrying out calculation for three model cases: operations in the event of malfunction of the control valve in the main water supply system for PWR, switching from an electrically-operated water supply pump to a turbin-operated water supply pump, and isolation and water removal operation for a low-pressure condensate pump. It is shown that the relative importance of each unit of a series of operations can be evaluated, making it possible to extract those units of greater importance, and that the priority among the factors which affect the reliability of operations can be determined. Results of the De-BDA calculation can serve to find important points to be considered in developing an operation manual, conducting education and training, and improving facilities. (Nogami, K.)

  12. System Description of the Electrical Power Supply System for the ATLAS Integral Test Loop

    International Nuclear Information System (INIS)

    Moon, S. K.; Park, J. K.; Kim, Y. S.; Song, C. H.; Baek, W. P.

    2007-02-01

    An integral effect test loop for pressurized water reactors (PWRs), the ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), is constructed by Thermal-Hydraulics Safety Research Team in Korea Atomic Energy Research Institute (KAERI). The ATLAS facility has been designed to have the length scale of 1/2 and area scale of 1/144 compared with the reference plant, APR1400. This report describes the design and technical specifications of the electrical power supply system which supplies the electrical powers to core heater rods, other heaters, various pumps and other systems. The electrical power supply system had acquired the final approval on the operation from the Korea Electrical Safety Corporation. During performance tests for the operation and control, the electrical power supply system showed completely acceptable operation and control performance

  13. System Reliability for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Marquez-Dominguez, Sergio; Sørensen, John Dalsgaard

    2013-01-01

    E). In consequence, a rational treatment of uncertainties is done in order to assess the reliability of critical details in OWTs. Limit state equations are formulated for fatigue critical details which are not influenced by wake effects generated in offshore wind farms. Furthermore, typical bi-linear S-N curves...... are considered for reliability verification according to international design standards of OWTs. System effects become important for each substructure with many potential fatigue hot spots. Therefore, in this paper a framework for system effects is presented. This information can be e.g. no detection of cracks...... in inspections or measurements from condition monitoring systems. Finally, an example is established to illustrate the practical application of this framework for jacket type wind turbine substructure considering system effects....

  14. Structural Reliability Methods for Wind Power Converter System Component Reliability Assessment

    DEFF Research Database (Denmark)

    Kostandyan, Erik; Sørensen, John Dalsgaard

    2012-01-01

    Wind power converter systems are essential subsystems in both off-shore and on-shore wind turbines. It is the main interface between generator and grid connection. This system is affected by numerous stresses where the main contributors might be defined as vibration and temperature loadings....... The temperature variations induce time-varying stresses and thereby fatigue loads. A probabilistic model is used to model fatigue failure for an electrical component in the power converter system. This model is based on a linear damage accumulation and physics of failure approaches, where a failure criterion...... is defined by the threshold model. The attention is focused on crack propagation in solder joints of electrical components due to the temperature loadings. Structural Reliability approaches are used to incorporate model, physical and statistical uncertainties. Reliability estimation by means of structural...

  15. Supply systems of forest chip production in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Kaerhae, K. (Metsaeteho Oy, Helsinki (Finland)), e-mail: kalle.karha@metsateho.fi

    2010-07-01

    The Metsaeteho study investigated how logging residue chips, stump wood chips, and chips from small-diameter thinning wood and large-sized (rotten) roundwood used by heating and power plants were produced in Finland in 2009. Almost all the major forest chip suppliers in Finland were involved in the study. The total volume of forest chips supplied in 2009 by these suppliers was 8,4 TWh. The study was implemented by conducting an e-mail questionnaire survey and telephone interviews. Research data was collected from March-May, 2010. The majority of the logging residue chips and chips from small-diameter thinning wood were produced using the roadside chipping supply system in Finland in 2009. The chipping at plant supply system was also significant in the production of logging residue chips. Nearly 70 % of all stump wood chips consumed were comminuted at the plant and 28 % at terminals. The role of the terminal chipping supply system was also significant in the production of chips from logging residues and small-diameter wood chips. When producing chips from large-sized (rotten) roundwood, similarly roughly 70 % of chips were comminuted at plants and 23 % at terminals. (orig.)

  16. Flexibility of Supply Chain in Industrialised Building System (IBS

    Directory of Open Access Journals (Sweden)

    Kassim U.

    2014-01-01

    Full Text Available It is irrefutable that the construction industry is in need of a highly technological construction method or system for the simple aim of giving it a push it deserves. In Malaysia this technologically enhanced method is known as the Indutrialised Building System (IBS. Concerted efforts have been made for the past decade by various responsible parties especially by the government. Therefore, the IBS ‘Road Map’ 2003–2010 was introduced and now continues with the IBS ‘road map’ 2011-2015. However, its performance is still at its infancy, which target is only at an initial stage. This study seeks to identify and analyse the factor of the IBS’ system’s supply chain flexibility as a factor on the success of the system itself. It has been a suspicion that there exists a condition and situation where the supply chain is too rigid and is not flexible in fulfilling the needs and demands of the IBS development in Malaysia. This inflexible situation has brought about a broad range of problems and has stood in the way of the development of the industrialised building system, despite it being introduced since 1964, or 49 years ago. Flexibility in the IBS supply chain is very important and is associated with other industries like transportation, manufacturing industry, and others. Up until now, we have yet to discover any special studies related to the flexibility in the IBS supply chain in this country. Responding to this challenge, this research is hoped to be able to provide sufficient feedback to the solution to the IBS supply chain flexibility issue. The researcher is confident that the poor system flow of supply chain has impeded the advancement of the Industrialised Building System that has long been open to debate.

  17. A supply chain approach to biochar systems [Chapter 2

    Science.gov (United States)

    Nathaniel M. Anderson; Richard D. Bergman; Deborah S. Page-Dumroese

    2017-01-01

    Biochar systems are designed to meet four related primary objectives: improve soils, manage waste, generate renewable energy, and mitigate climate change. Supply chain models provide a holistic framework for examining biochar systems with an emphasis on product life cycle and end use. Drawing on concepts in supply chain management and engineering, this chapter presents...

  18. D. C. power supply

    Energy Technology Data Exchange (ETDEWEB)

    Ohashi, N. Watanabe, Y.; Kitani, M

    1978-04-01

    DC power supplies are for ordinary and emergency use as power sources for various structures such as office buildings, department stores, hotels, and for facilities such as roads, tunnels, dams, power stations, etc. There is strong demand for these dc power supplies to be safe, automated, and maintenance free, and to have high reliability. A dc power supply which meets these demands is described; electric circuit construction is emphasized. (10 figures, 4 tables)

  19. An integrated reliability management system for nuclear power plants

    International Nuclear Information System (INIS)

    Kimura, T.; Shimokawa, H.; Matsushima, H.

    1998-01-01

    The responsibility in the nuclear field of the Government, utilities and manufactures has increased in the past years due to the need of stable operation and great reliability of nuclear power plants. The need to improve the reliability is not only for the new plants but also for those now running. So, several measures have been taken to improve reliability. In particular, the plant manufactures have developed a reliability management system for each phase (planning, construction, maintenance and operation) and these have been integrated as a unified system. This integrated reliability management system for nuclear power plants contains information about plant performance, failures and incidents which have occurred in the plants. (author)

  20. Reliability and standard market design : a square plug and a round socket, the fundamental flaw of the market design

    International Nuclear Information System (INIS)

    Bekman, K.

    2003-01-01

    A electricity power system is designed and built to deliver reliable power supplies. A failure of a single component should not lead to the failure of the entire system. Oversupply results in prices at marginal cost of production, inadequate return on capital investment and economic failure of supplies. Uneconomic sources of supply would pull out in cases of oversupply. Competitive markets need flexible supply and demand and scarcity pricing in order to promote new investment. The problem with such a scenario is that scarcity reduces the level of reliability. An oversupply, while ensuring reliability, offers an inadequate return on capital. This presentation included several graphs depicting results of market failure with reference to NYMEX analysis of credit quality, NEPOOL summer capacity 2001, NYS summer capacity 2001, and PJM summer capacity 2001. A graph illustrating a New England 2002 load duration curve and its analysis was also included. According to the author, the market design is flawed because it does not pay for reliability. It fails to compensate generation for capital at risk, and it fails to address the fact that nearly half of the capacity supplies less than 10 per cent energy. He notes that the liquidity crisis will continue and grow unless changes are made and new entrants come into the market. 8 figs

  1. Contribution of components of Green Supply Chain Execution-Supply Loops in Green Supply Chain Performance measurement-A Pilot Empirical Study of the Indian Automobile Manufacturing Sector

    OpenAIRE

    Mohd. Asif Gandhi

    2017-01-01

    This paper is one of the several extensions of the research works done by [5]. Green Supply Chain Practices have been known to have an impact on Green Supply Chain Performance [5].This paper tests empirically through a pilot study of the Indian Automobile Manufacturing Sector, the contribution of the three variables constituting the construct Green Supply Chain Execution-Supply Loops in Green Supply Chain Performance measurement. Also the paper establishes the reliability of the questionnaire...

  2. Photovoltaic and Wind Turbine Integration Applying Cuckoo Search for Probabilistic Reliable Optimal Placement

    Directory of Open Access Journals (Sweden)

    R. A. Swief

    2018-01-01

    Full Text Available This paper presents an efficient Cuckoo Search Optimization technique to improve the reliability of electrical power systems. Various reliability objective indices such as Energy Not Supplied, System Average Interruption Frequency Index, System Average Interruption, and Duration Index are the main indices indicating reliability. The Cuckoo Search Optimization (CSO technique is applied to optimally place the protection devices, install the distributed generators, and to determine the size of distributed generators in radial feeders for reliability improvement. Distributed generator affects reliability and system power losses and voltage profile. The volatility behaviour for both photovoltaic cells and the wind turbine farms affect the values and the selection of protection devices and distributed generators allocation. To improve reliability, the reconfiguration will take place before installing both protection devices and distributed generators. Assessment of consumer power system reliability is a vital part of distribution system behaviour and development. Distribution system reliability calculation will be relayed on probabilistic reliability indices, which can expect the disruption profile of a distribution system based on the volatility behaviour of added generators and load behaviour. The validity of the anticipated algorithm has been tested using a standard IEEE 69 bus system.

  3. Risk of the Maritime Supply Chain System Based on Interpretative Structural Model

    Directory of Open Access Journals (Sweden)

    Jiang He

    2017-11-01

    Full Text Available Marine transportation is the most important transport mode of in the international trade, but the maritime supply chain is facing with many risks. At present, most of the researches on the risk of the maritime supply chain focus on the risk identification and risk management, and barely carry on the quantitative analysis of the logical structure of each influencing factor. This paper uses the interpretative structure model to analysis the maritime supply chain risk system. On the basis of comprehensive literature analysis and expert opinion, this paper puts forward 16 factors of maritime supply chain risk system. Using the interpretative structure model to construct maritime supply chain risk system, and then optimize the model. The model analyzes the structure of the maritime supply chain risk system and its forming process, and provides a scientific basis for the controlling the maritime supply chain risk, and puts forward some corresponding suggestions for the prevention and control the maritime supply chain risk.

  4. MANAGING THE LOAD SCHEDULE OF THE ADMINISTRATIVE BUILDING TAKING INTO ACCOUNT EMERGING RISKS WHEN CONNECTING THE KINETIC ENERGY STORAGE TO THE POWER SUPPLY SYSTEM

    Directory of Open Access Journals (Sweden)

    S. Yu. Shevchenko

    2017-12-01

    Full Text Available Purpose. The purpose of the paper is to analyze load schedules of the administrative building and develop a structural scheme for connecting the kinetic energy storage in the power supply system of this building, which will allow using it as a consumer regulator, as well as a theoretical study of the risks that arise. Methodology. To conduct the research, the theory of designing internal electrical networks of buildings, the theory of plotting electric load graphs, methods of the theory of electromechanical systems and for analyzing the risk system, the T. Saati method of hierarchies were used. Results. The structure of kinetic energy storage (KES connection to the power supply system of the administrative building is developed and the structural diagram of the KES proposed for installation is given, the average daily winter and summer load schedules are presented, a set of groups and subgroups of risks and their influence on the work of the power supply system of the building are connected with the connection of the KES. Originality. For the first time, the application of the kinetic energy storage in the power supply system of the building with the analysis of emerging risks is considered, which makes it possible to improve the reliability of the developed system and the efficiency of load regulation. Practical value. The application of the proposed scheme will make it possible to use administrative buildings as load regulators of the external power supply system, and also effectively manage the load in the internal power supply system of the building.

  5. ISABELLE magnet power supply system performance analysis

    International Nuclear Information System (INIS)

    Edwards, R.J.

    1981-01-01

    The power supply system that will energize the superconducting magnets in the ISABELLE 400 x 400 GeV accelerator must supply various voltages and currents. The voltages for the correction winding range from ten to one hundred twenty-five volts unipolar and bipolar with current rating of 50 to 300 amperes. The main field winding requires voltages from 90V (at flattop) to 600V during maximum ramp rate or acceleration cycle. The power supplies are programmable over their full range of output current with a reproducibility error varying from +- 10 ppM to +- 400 ppM of full scale. Included within the reproducibility error are the long and short term stability requirements of the power supplies. The purpose of this paper is to define some of the design goals and outline the approach taken in reaching these goals

  6. Reliability of power electronic converter systems

    CERN Document Server

    Chung, Henry Shu-hung; Blaabjerg, Frede; Pecht, Michael

    2016-01-01

    This book outlines current research into the scientific modeling, experimentation, and remedial measures for advancing the reliability, availability, system robustness, and maintainability of Power Electronic Converter Systems (PECS) at different levels of complexity.

  7. Hybrid energy system evaluation in water supply system energy production: neural network approach

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Fabio V.; Ramos, Helena M. [Civil Engineering Department, Instituto Superior Tecnico, Technical University of Lisbon, Av. Rovisco Pais, 1049-001, Lisbon (Portugal); Reis, Luisa Fernanda R. [Universidade de Sao Paulo, EESC/USP, Departamento de Hidraulica e Saneamento., Avenida do Trabalhador Saocarlense, 400, Sao Carlos-SP (Brazil)

    2010-07-01

    Water supply systems are large consumers of energy and the use of hybrid systems for green energy production is this new proposal. This work presents a computational model based on neural networks to determine the best configuration of a hybrid system to generate energy in water supply systems. In this study the energy sources to make this hybrid system can be the national power grid, micro-hydro and wind turbines. The artificial neural network is composed of six layers, trained to use data generated by a model of hybrid configuration and an economic simulator - CES. The reason for the development of an advanced model of forecasting based on neural networks is to allow rapid simulation and proper interaction with hydraulic and power model simulator - HPS. The results show that this computational model is useful as advanced decision support system in the design of configurations of hybrid power systems applied to water supply systems, improving the solutions in the development of its global energy efficiency.

  8. Will building new reservoirs always help increase the water supply reliability? - insight from a modeling-based global study

    Science.gov (United States)

    Zhuang, Y.; Tian, F.; Yigzaw, W.; Hejazi, M. I.; Li, H. Y.; Turner, S. W. D.; Vernon, C. R.

    2017-12-01

    More and more reservoirs are being build or planned in order to help meet the increasing water demand all over the world. However, is building new reservoirs always helpful to water supply? To address this question, the river routing module of Global Change Assessment Model (GCAM) has been extended with a simple yet physical-based reservoir scheme accounting for irrigation, flood control and hydropower operations at each individual reservoir. The new GCAM river routing model has been applied over the global domain with the runoff inputs from the Variable Infiltration Capacity Model. The simulated streamflow is validated at 150 global river basins where the observed streamflow data are available. The model performance has been significantly improved at 77 basins and worsened at 35 basins. To facilitate the analysis of additional reservoir storage impacts at the basin level, a lumped version of GCAM reservoir model has been developed, representing a single lumped reservoir at each river basin which has the regulation capacity of all reservoir combined. A Sequent Peak Analysis is used to estimate how much additional reservoir storage is required to satisfy the current water demand. For basins with water deficit, the water supply reliability can be improved with additional storage. However, there is a threshold storage value at each basin beyond which the reliability stops increasing, suggesting that building new reservoirs will not help better relieve the water stress. Findings in the research can be helpful to the future planning and management of new reservoirs.

  9. [The development of hospital medical supplies information management system].

    Science.gov (United States)

    Cao, Shaoping; Gu, Hongqing; Zhang, Peng; Wang, Qiang

    2010-05-01

    The information management of medical materials by using high-tech computer, in order to improve the efficiency of the consumption of medical supplies, hospital supplies and develop a new technology way to manage the hospital and material support. Using C # NET, JAVA techniques to develop procedures for the establishment of hospital material management information system, set the various management modules, production of various statistical reports, standard operating procedures. The system is convenient, functional and strong, fluent statistical functions. It can always fully grasp and understand the whole hospital supplies run dynamic information, as a modern and effective tool for hospital materials management.

  10. Operator reliability assessment system (OPERAS)

    International Nuclear Information System (INIS)

    Singh, A.; Spurgin, A.J.; Martin, T.; Welsch, J.; Hallam, J.W.

    1991-01-01

    OPERAS is a personal-computer (PC) based software to collect and process simulator data on control-room operators responses during requalification training scenarios. The data collection scheme is based upon approach developed earlier during the EPRI Operator Reliability Experiments project. The software allows automated data collection from simulator, thus minimizing simulator staff time and resources to collect, maintain and process data which can be useful in monitoring, assessing and enhancing the progress of crew reliability and effectiveness. The system is designed to provide the data and output information in the form of user-friendly charts, tables and figures for use by plant staff. OPERAS prototype software has been implemented at the Diablo Canyon (PWR) and Millstone (BWR) plants and is currently being used to collect operator response data. Data collected from similator include plant-state variables such as reactor pressure and temperature, malfunction, times at which annunciators are activated, operator actions and observations of crew behavior by training staff. The data and systematic analytical results provided by the OPERAS system can contribute to increase objectivity by the utility probabilistic risk analysis (PRA) and training staff in monitoring and assessing reliability of their crews

  11. Development in structural systems reliability theory

    Energy Technology Data Exchange (ETDEWEB)

    Murotsu, Y

    1986-07-01

    This paper is concerned with two topics on structural systems reliability theory. One covers automatic generation of failure mode equations, identifications of stochastically dominant failure modes, and reliability assessment of redundant structures. Reduced stiffness matrixes and equivalent nodal forces representing the failed elements are introduced for expressing the safety of the elements, using a matrix method. Dominant failure modes are systematically selected by a branch-and-bound technique and heuristic operations. The other discusses the various optimum design problems based on reliability concept. Those problems are interpreted through a solution to a multi-objective optimization problem.

  12. Development in structural systems reliability theory

    International Nuclear Information System (INIS)

    Murotsu, Y.

    1986-01-01

    This paper is concerned with two topics on structural systems reliability theory. One covers automatic generation of failure mode equations, identifications of stochastically dominant failure modes, and reliability assessment of redundant structures. Reduced stiffness matrixes and equivalent nodal forces representing the failed elements are introduced for expressing the safety of the elements, using a matrix method. Dominant failure modes are systematically selected by a branch-and-bound technique and heuristic operations. The other discusses the various optimum design problems based on reliability concept. Those problems are interpreted through a solution to a multi-objective optimization problem. (orig.)

  13. Expiration of franchise contracts - supply reliability and competition. Ablauf von Konzessionsvertraegen - Versorgungssicherheit und Wettbewerb

    Energy Technology Data Exchange (ETDEWEB)

    Baur, J.F. (Koeln Univ. (Germany). Inst. fuer Energierecht Koeln Univ. (Germany). Inst. fuer das Recht der Europaeischen Gemeinschaften) (ed.); Biedermann, W. (Erdgas Suedbayern GmbH, Muenchen (Germany)); Busse von Colbe, W. (Bochum Univ. (Germany)); Hempel, D. (Wuppertaler Stadtwerke AG, Wuppertal (Germany)); Schulz-Jander, R. (Schleswag AG, Rendsburg (Germany)); Tettinger, P.J. (Bochum Univ. (G

    1992-01-01

    At the moment, a large portion of the territories to be supplied with power which is dependent on power distribution networks is at the power suppliers' disposal. Most of the old licensing contracts will run out by January 1, 1995 at the latest. The local authorities are free to choose whether they want to renew their contract with the previous power supply company, whether they want to provide for themselves or whether they want to make a new licencing contract with neighbouring power supply company. Therefore the local authorities are deliberating on the structure of their power supply systems of the future. But regarding the future dimensions of the territories which they hope to supply are being made. At the annual meeting of the Institut fuer Energierecht (in November of 1992), the problems which typically arise when a licensing contract is terminated were examined. The costs which a local government will have to carry play an important role when it comes to deciding whether the local authorities will take the opportunity of the termination of a licensing contract to stop doing business with the previous power supplier or not. If the licensing contracts which are to be assessed lack regulations on the adoption of power-distribution networks and costs of network disentanglement, then use should be made of legal standards of assessment. (orig./HSCH).

  14. Reliability and durability in solar energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Godolphin, D.

    1982-10-01

    The reliability and durability in solar energy systems for residential buildings is discussed. It is concluded that although strides have been made in design and manufacturing over the past years, the reliability and durability of the equipment depends on the proper installation. (MJF)

  15. DIII-D power supply, design, and development

    International Nuclear Information System (INIS)

    Nerem, A.

    1995-02-01

    An overview of the DIII-D power supply system with information details concerning the configuration, power ratings, acquisition costs, and cost scaling relevant to the design of ITER and other tokamaks is presented. The power supplies for the DIII-D tokamak were installed and commissioned during the late 1970's and the beginning of the 1980's. Several upgrades have been implemented during the last two years to solve increasing reliability problems encountered as the equipment aged, to provide enhanced operational flexibilities, and to enable operation at the higher power levels needed to provide experimental data relevant to the ITER and TPX design activities. These upgrades ranged from redesign of the power supply control systems to the replacement of vacuum circuit breakers which had become unreliable in service. A new interlock and protection system has also been implemented using the latest programmable logic controllers (PLC) and computer technology. These upgrades have been highly successful and are described to provide insight to many issues in the specification of high power converters. Power supply models used in the design of the DIII-D Plasma Control System are also described along with model verification test data. These models are being used in the development of a new advanced plasma control system for the DIII-D tokamak. Recent operational experience and results are presented

  16. On estimation of reliability of a nuclear power plant with tokamak reactor

    International Nuclear Information System (INIS)

    Klemin, A.I.; Smetannikov, V.P.; Shiverskij, E.A.

    1982-01-01

    The results of the analysis of INTOR plant reliability are presented. The first stage of the analysis consists in the calculation of the INTOR plant structural reliability factors (15 ibs main systems have been considered). For each system the failure flow parameter (W(1/h)) and operational readiness Ksub(r) have been determined which for the plant as a whole besides these factors-technological utilization coefficient Ksub(TU) and mean-cycles-between failures Tsub(o). The second stage of the reliability analysis consists in investigating methods of improving its reliability factors reratively to the one calculated at the first level stage. It is shown that the reliability of the whole plant to the most essential extent is determined by the power supply system reliability. The following as to the influence extent on the INTOR plant reliability is the cryogenic system. Calculations of the INTOR plant reliability factors have given the following values: W=4,5x10 -3 1/h. Tsub(o)=152 h, Ksub(r)=0,71, Ksub(TU)=o,4 g

  17. Route planning module as a part of Supply Chain Management system

    Directory of Open Access Journals (Sweden)

    Michal Košíček

    2012-01-01

    Full Text Available Today, the demand for creating a systematic approach for managing sales, ordering, and logistics has increased. Supply Chain Management (SCM is one of the responses to problems that have arose with the need for managing complex supply chains. Nowadays, most of the activities of Supply Chain Management is realized or supported with computing technologies. Route planning is an important part of Supply Chain Management related to both procurement and distribution. Route planning systems specify the sequences in which the selected transport vehicles should supply the demand points by requested quantities of goods at the right time. The paper is focused on the analysis of a route planning system which could be used as a part of Supply Chain Management information system or as a standalone application. It describes basic techniques and frameworks of transportation problems as well as important functional requirements, considering recent trends in the field of distribution planning. As a result, functional specification of basic features and other components of system are provided. The paper is a result of a joint initiative of the authors and a vendor of business information systems.

  18. System reliability evaluation of a touch panel manufacturing system with defect rate and reworking

    International Nuclear Information System (INIS)

    Lin, Yi-Kuei; Huang, Cheng-Fu; Chang, Ping-Chen

    2013-01-01

    In recent years, portable consumer electronic products, such as cell phone, GPS, digital camera, tablet PC, and notebook are using touch panel as interface. With the demand of touch panel increases, performance assessment is essential for touch panel production. This paper develops a method to evaluate system reliability of a touch panel manufacturing system (TPMS) with defect rate of each workstation and takes reworking actions into account. The system reliability which evaluates the possibility of demand satisfaction can provide to managers with an understanding of the system capability and can indicate possible improvements. First, we construct a capacitated manufacturing network (CMN) for a TPMS. Second, a decomposition technique is developed to determine the input flow of each workstation based on the CMN. Finally, we generate the minimal capacity vectors that should be provided to satisfy the demand. The system reliability is subsequently evaluated in terms of the minimal capacity vectors. A further decision making issue is discussed to decide a reliable production strategy. -- Graphical abstract: The proposed procedure to evaluate system reliability of the touch panel manufacturing system (TPMS). Highlights: • The system reliability of a touch panel manufacturing system (TPMS) is evaluated. • The reworking actions are taken into account in the TPMS. • A capacitated manufacturing network is constructed for the TPMS. • A procedure is proposed to evaluate system reliability of TPMS

  19. Statistical reliability assessment of software-based systems

    International Nuclear Information System (INIS)

    Korhonen, J.; Pulkkinen, U.; Haapanen, P.

    1997-01-01

    Plant vendors nowadays propose software-based systems even for the most critical safety functions. The reliability estimation of safety critical software-based systems is difficult since the conventional modeling techniques do not necessarily apply to the analysis of these systems, and the quantification seems to be impossible. Due to lack of operational experience and due to the nature of software faults, the conventional reliability estimation methods can not be applied. New methods are therefore needed for the safety assessment of software-based systems. In the research project Programmable automation systems in nuclear power plants (OHA), financed together by the Finnish Centre for Radiation and Nuclear Safety (STUK), the Ministry of Trade and Industry and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. This volume in the OHA-report series deals with the statistical reliability assessment of software based systems on the basis of dynamic test results and qualitative evidence from the system design process. Other reports to be published later on in OHA-report series will handle the diversity requirements in safety critical software-based systems, generation of test data from operational profiles and handling of programmable automation in plant PSA-studies. (orig.) (25 refs.)

  20. Reliability prediction of engineering systems with competing failure modes due to component degradation

    International Nuclear Information System (INIS)

    Son, Young Kap

    2011-01-01

    Reliability of an engineering system depends on two reliability metrics: the mechanical reliability, considering component failures, that a functional system topology is maintained and the performance reliability of adequate system performance in each functional configuration. Component degradation explains not only the component aging processes leading to failure in function, but also system performance change over time. Multiple competing failure modes for systems with degrading components in terms of system functionality and system performance are considered in this paper with the assumption that system functionality is not independent of system performance. To reduce errors in system reliability prediction, this paper tries to extend system performance reliability prediction methods in open literature through combining system mechanical reliability from component reliabilities and system performance reliability. The extended reliability prediction method provides a useful way to compare designs as well as to determine effective maintenance policy for efficient reliability growth. Application of the method to an electro-mechanical system, as an illustrative example, is explained in detail, and the prediction results are discussed. Both mechanical reliability and performance reliability are compared to total system reliability in terms of reliability prediction errors

  1. On adaptive modified projective synchronization of a supply chain management system

    Science.gov (United States)

    Tirandaz, Hamed

    2017-12-01

    In this paper, the synchronization problem of a chaotic supply chain management system is studied. A novel adaptive modified projective synchronization method is introduced to control the behaviour of the leader supply chain system by a follower chaotic system and to adjust the leader system parameters until the measurable errors of the system parameters converge to zero. The stability evaluation and convergence analysis are carried out by the Lyapanov stability theorem. The proposed synchronization and antisynchronization techniques are studied for identical supply chain chaotic systems. Finally, some numerical simulations are presented to verify the effectiveness of the theoretical discussions.

  2. Reliability assessment of complex electromechanical systems under epistemic uncertainty

    International Nuclear Information System (INIS)

    Mi, Jinhua; Li, Yan-Feng; Yang, Yuan-Jian; Peng, Weiwen; Huang, Hong-Zhong

    2016-01-01

    The appearance of macro-engineering and mega-project have led to the increasing complexity of modern electromechanical systems (EMSs). The complexity of the system structure and failure mechanism makes it more difficult for reliability assessment of these systems. Uncertainty, dynamic and nonlinearity characteristics always exist in engineering systems due to the complexity introduced by the changing environments, lack of data and random interference. This paper presents a comprehensive study on the reliability assessment of complex systems. In view of the dynamic characteristics within the system, it makes use of the advantages of the dynamic fault tree (DFT) for characterizing system behaviors. The lifetime of system units can be expressed as bounded closed intervals by incorporating field failures, test data and design expertize. Then the coefficient of variation (COV) method is employed to estimate the parameters of life distributions. An extended probability-box (P-Box) is proposed to convey the present of epistemic uncertainty induced by the incomplete information about the data. By mapping the DFT into an equivalent Bayesian network (BN), relevant reliability parameters and indexes have been calculated. Furthermore, the Monte Carlo (MC) simulation method is utilized to compute the DFT model with consideration of system replacement policy. The results show that this integrated approach is more flexible and effective for assessing the reliability of complex dynamic systems. - Highlights: • A comprehensive study on the reliability assessment of complex system is presented. • An extended probability-box is proposed to convey the present of epistemic uncertainty. • The dynamic fault tree model is built. • Bayesian network and Monte Carlo simulation methods are used. • The reliability assessment of a complex electromechanical system is performed.

  3. Control system of power supply for resistance welding machine

    Directory of Open Access Journals (Sweden)

    Світлана Костянтинівна Поднебенна

    2017-06-01

    Full Text Available This article describes the existing methods of heat energy stabilizing, which are realized in thyristor power supplies for resistance welding machines. The advantages and features of thyristor power supplies have been described. A control system of power supply for resistance welding machine with stabilization of heat energy in a welding spot has been developed. Measurements are performed in primary winding of a welding transformer. Weld spot heating energy is calculated as the difference between the energy, consumed from the mains, and the energy losses in the primary and secondary circuits of the welding transformer as well as the energy losses in the transformer core. Algorithms of digital signal processing of the developed control system are described in the article. All measurements and calculations are preformed automatically in real-time. Input signals to the control system are: transformer primary voltage and current, temperature of the welding circuit. The designed control system ensures control of the welding heat energy and is not influenced by the supply voltage and impedance changes caused by insertion of the ferromagnetic mass in the welding circuit, the temperature change during the welding process. The developed control system for resistance welding machine makes it possible to improve the quality of welded joints, increase the efficiency of the resistance welding machine

  4. Distribution system reliability evaluation using credibility theory | Xu ...

    African Journals Online (AJOL)

    In this paper, a hybrid algorithm based on fuzzy simulation and Failure Mode and Effect Analysis (FMEA) is applied to determine fuzzy reliability indices of distribution system. This approach can obtain fuzzy expected values and their variances of reliability indices, and the credibilities of reliability indices meeting specified ...

  5. Evolving Reliability and Maintainability Allocations for NASA Ground Systems

    Science.gov (United States)

    Munoz, Gisela; Toon, T.; Toon, J.; Conner, A.; Adams, T.; Miranda, D.

    2016-01-01

    This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) programs subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

  6. Conceptual Software Reliability Prediction Models for Nuclear Power Plant Safety Systems

    International Nuclear Information System (INIS)

    Johnson, G.; Lawrence, D.; Yu, H.

    2000-01-01

    The objective of this project is to develop a method to predict the potential reliability of software to be used in a digital system instrumentation and control system. The reliability prediction is to make use of existing measures of software reliability such as those described in IEEE Std 982 and 982.2. This prediction must be of sufficient accuracy to provide a value for uncertainty that could be used in a nuclear power plant probabilistic risk assessment (PRA). For the purposes of the project, reliability was defined to be the probability that the digital system will successfully perform its intended safety function (for the distribution of conditions under which it is expected to respond) upon demand with no unintended functions that might affect system safety. The ultimate objective is to use the identified measures to develop a method for predicting the potential quantitative reliability of a digital system. The reliability prediction models proposed in this report are conceptual in nature. That is, possible prediction techniques are proposed and trial models are built, but in order to become a useful tool for predicting reliability, the models must be tested, modified according to the results, and validated. Using methods outlined by this project, models could be constructed to develop reliability estimates for elements of software systems. This would require careful review and refinement of the models, development of model parameters from actual experience data or expert elicitation, and careful validation. By combining these reliability estimates (generated from the validated models for the constituent parts) in structural software models, the reliability of the software system could then be predicted. Modeling digital system reliability will also require that methods be developed for combining reliability estimates for hardware and software. System structural models must also be developed in order to predict system reliability based upon the reliability

  7. Reliability analysis and initial requirements for FC systems and stacks

    Science.gov (United States)

    Åström, K.; Fontell, E.; Virtanen, S.

    In the year 2000 Wärtsilä Corporation started an R&D program to develop SOFC systems for CHP applications. The program aims to bring to the market highly efficient, clean and cost competitive fuel cell systems with rated power output in the range of 50-250 kW for distributed generation and marine applications. In the program Wärtsilä focuses on system integration and development. System reliability and availability are key issues determining the competitiveness of the SOFC technology. In Wärtsilä, methods have been implemented for analysing the system in respect to reliability and safety as well as for defining reliability requirements for system components. A fault tree representation is used as the basis for reliability prediction analysis. A dynamic simulation technique has been developed to allow for non-static properties in the fault tree logic modelling. Special emphasis has been placed on reliability analysis of the fuel cell stacks in the system. A method for assessing reliability and critical failure predictability requirements for fuel cell stacks in a system consisting of several stacks has been developed. The method is based on a qualitative model of the stack configuration where each stack can be in a functional, partially failed or critically failed state, each of the states having different failure rates and effects on the system behaviour. The main purpose of the method is to understand the effect of stack reliability, critical failure predictability and operating strategy on the system reliability and availability. An example configuration, consisting of 5 × 5 stacks (series of 5 sets of 5 parallel stacks) is analysed in respect to stack reliability requirements as a function of predictability of critical failures and Weibull shape factor of failure rate distributions.

  8. Reliability issues of free-space communications systems and networks

    Science.gov (United States)

    Willebrand, Heinz A.

    2003-04-01

    Free space optics (FSO) is a high-speed point-to-point connectivity solution traditionally used in the enterprise campus networking market for building-to-building LAN connectivity. However, more recently some wire line and wireless carriers started to deploy FSO systems in their networks. The requirements on FSO system reliability, meaing both system availability and component reliability, are far more stringent in the carrier market when compared to the requirements in the enterprise market segment. This paper tries to outline some of the aspects that are important to ensure carrier class system reliability.

  9. Comparing two reliability upper bounds for multistate systems

    International Nuclear Information System (INIS)

    Meng, Fan C.

    2005-01-01

    The path-cut reliability bound due to Esary and Proschan [J. Am. Stat. Assoc. 65 (1970) 329] and the minimax reliability bound due to Barlow and Proschan [Statistical Theory of Reliability and Life Testing: Probability Models, 1981] for binary systems have been generalized to multistate systems by Block and Savits [J. Appl. Probab. 19 (1982) 391]. Some comparison results concerning the two multistate lower bounds for various types of multistate systems are given by Meng [Probab. Eng. Inform. Sci. 16 (2002) 485]. In this note we compare the two multistate upper bounds and present results which generalize some previous ones obtained by Maymin [J. Stat. Plan. Inference 16 (1987) 337] for binary systems. Examples are given to illustrate our results

  10. NEA activities on medical isotope supply issues

    International Nuclear Information System (INIS)

    Westmacott, C.; Vance, R.

    2009-01-01

    variety of challenges: the management of existing capacities and maximization of these capacities in times of shortages; the economic validity of the current model of producing isotopes; flexibility and efficiency of the supply chain; regulatory requirements; and demand-side management. They identified the need to develop, deepen and share, as appropriate, contingency plans for future supply disruptions. They also focused on the longer term and on the need to engage health authorities to reduce uncertainties regarding long-term demand and the means by which to encourage more investment in production and greater spare capacity in the system. At the workshop, there was unanimous support for the establishment of a working group to carry forward the conclusions of the workshop and to identify the practical measures that should be taken. This working group, the High-level Group on the Security of Supply of Medical Radioisotopes (HLG-MR), was established by the NEA following endorsement by the Steering Committee for Nuclear Energy, and is comprised of 20 experts from 11 countries, the European Commission and the International Atomic Energy Agency. The group will oversee and assist, where necessary, efforts of the international community to address the challenges of medical isotope supply reliability

  11. Innovations in power systems reliability

    CERN Document Server

    Santora, Albert H; Vaccaro, Alfredo

    2011-01-01

    Electrical grids are among the world's most reliable systems, yet they still face a host of issues, from aging infrastructure to questions of resource distribution. Here is a comprehensive and systematic approach to tackling these contemporary challenges.

  12. Interrater reliability of a Pilates movement-based classification system.

    Science.gov (United States)

    Yu, Kwan Kenny; Tulloch, Evelyn; Hendrick, Paul

    2015-01-01

    To determine the interrater reliability for identification of a specific movement pattern using a Pilates Classification system. Videos of 5 subjects performing specific movement tasks were sent to raters trained in the DMA-CP classification system. Ninety-six raters completed the survey. Interrater reliability for the detection of a directional bias was excellent (Pi = 0.92, and K(free) = 0.89). Interrater reliability for classifying an individual into a specific subgroup was moderate (Pi = 0.64, K(free) = 0.55) however raters who had completed levels 1-4 of the DMA-CP training and reported using the assessment daily demonstrated excellent reliability (Pi = 0.89 and K(free) = 0.87). The reliability of the classification system demonstrated almost perfect agreement in determining the existence of a specific movement pattern and classifying into a subgroup for experienced raters. There was a trend for greater reliability associated with increased levels of training and experience of the raters. Copyright © 2014 Elsevier Ltd. All rights reserved.

  13. Development of RBDGG Solver and Its Application to System Reliability Analysis

    International Nuclear Information System (INIS)

    Kim, Man Cheol

    2010-01-01

    For the purpose of making system reliability analysis easier and more intuitive, RBDGG (Reliability Block diagram with General Gates) methodology was introduced as an extension of the conventional reliability block diagram. The advantage of the RBDGG methodology is that the structure of a RBDGG model is very similar to the actual structure of the analyzed system, and therefore the modeling of a system for system reliability and unavailability analysis becomes very intuitive and easy. The main idea of the development of the RBDGG methodology is similar with that of the development of the RGGG (Reliability Graph with General Gates) methodology, which is an extension of a conventional reliability graph. The newly proposed methodology is now implemented into a software tool, RBDGG Solver. RBDGG Solver was developed as a WIN32 console application. RBDGG Solver receives information on the failure modes and failure probabilities of each component in the system, along with the connection structure and connection logics among the components in the system. Based on the received information, RBDGG Solver automatically generates a system reliability analysis model for the system, and then provides the analysis results. In this paper, application of RBDGG Solver to the reliability analysis of an example system, and verification of the calculation results are provided for the purpose of demonstrating how RBDGG Solver is used for system reliability analysis

  14. A Review: Passive System Reliability Analysis – Accomplishments and Unresolved Issues

    Energy Technology Data Exchange (ETDEWEB)

    Nayak, Arun Kumar, E-mail: arunths@barc.gov.in [Reactor Engineering Division, Reactor Design and Development Group, Bhabha Atomic Research Centre, Mumbai (India); Chandrakar, Amit [Homi Bhabha National Institute, Mumbai (India); Vinod, Gopika [Reactor Safety Division, Reactor Design and Development Group, Bhabha Atomic Research Centre, Mumbai (India)

    2014-10-10

    Reliability assessment of passive safety systems is one of the important issues, since safety of advanced nuclear reactors rely on several passive features. In this context, a few methodologies such as reliability evaluation of passive safety system (REPAS), reliability methods for passive safety functions (RMPS), and analysis of passive systems reliability (APSRA) have been developed in the past. These methodologies have been used to assess reliability of various passive safety systems. While these methodologies have certain features in common, but they differ in considering certain issues; for example, treatment of model uncertainties, deviation of geometric, and process parameters from their nominal values. This paper presents the state of the art on passive system reliability assessment methodologies, the accomplishments, and remaining issues. In this review, three critical issues pertaining to passive systems performance and reliability have been identified. The first issue is applicability of best estimate codes and model uncertainty. The best estimate codes based phenomenological simulations of natural convection passive systems could have significant amount of uncertainties, these uncertainties must be incorporated in appropriate manner in the performance and reliability analysis of such systems. The second issue is the treatment of dynamic failure characteristics of components of passive systems. REPAS, RMPS, and APSRA methodologies do not consider dynamic failures of components or process, which may have strong influence on the failure of passive systems. The influence of dynamic failure characteristics of components on system failure probability is presented with the help of a dynamic reliability methodology based on Monte Carlo simulation. The analysis of a benchmark problem of Hold-up tank shows the error in failure probability estimation by not considering the dynamism of components. It is thus suggested that dynamic reliability methodologies must be

  15. Reliability Issues in Stirling Radioisotope Power Systems

    Science.gov (United States)

    Schreiber, Jeffrey; Shah, Ashwin

    2005-01-01

    Stirling power conversion is a potential candidate for use in a Radioisotope Power System (RPS) for space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced requirement of radioactive material. Reliability of an RPS that utilizes Stirling power conversion technology is important in order to ascertain long term successful performance. Owing to long life time requirement (14 years), it is difficult to perform long-term tests that encompass all the uncertainties involved in the design variables of components and subsystems comprising the RPS. The requirement for uninterrupted performance reliability and related issues are discussed, and some of the critical areas of concern are identified. An overview of the current on-going efforts to understand component life, design variables at the component and system levels, and related sources and nature of uncertainties are also discussed. Current status of the 110 watt Stirling Radioisotope Generator (SRG110) reliability efforts is described. Additionally, an approach showing the use of past experience on other successfully used power systems to develop a reliability plan for the SRG110 design is outlined.

  16. Defence in depth for electric power supplies in Indian nuclear power plants

    International Nuclear Information System (INIS)

    Gupta, S.K.; Srivasista, K.; Solanki, R.B.

    2009-01-01

    The purpose of electric power supply system in a nuclear power plant is to supply and distribute reliable electric power to safety related systems and systems important to safety in various forms, arrangements and combinations of redundancy and diversity in order to perform safety functions required during operational states and design basis events (DBE) such as shutting down the reactor, maintaining the reactor in safe shutdown state, containment isolation and reactor core cooling preventing significant release of radioactive material to the environment. Hence the design basis of electric power supply systems includes identification of DBE that require power supplies, adequacy of redundancy and diversity, environmental conditions to which electric equipment are qualified, identification of loads requiring interrupted and uninterrupted power supplies, time sequence in which emergency loads are to be supplied in case of interruption, provisions for maintaining and testing, consideration for minimum duration capability of emergency power supplies during station blackout etc. Based on operation experience, results of probability safety assessment and certain weaknesses noticed in defence in depth of electric power supply systems, several continuous design improvements have been made in Indian nuclear power plants during operating phase and life extension. Instituting various tests during initial commissioning, subsequent operation and life extension has ensured high standards of performance of electric power supplies. Some of these aspects are highlighted in this paper

  17. A heuristic-based approach for reliability importance assessment of energy producers

    International Nuclear Information System (INIS)

    Akhavein, A.; Fotuhi Firuzabad, M.

    2011-01-01

    Reliability of energy supply is one of the most important issues of service quality. On one hand, customers usually have different expectations for service reliability and price. On the other hand, providing different level of reliability at load points is a challenge for system operators. In order to take reasonable decisions and obviate reliability implementation difficulties, market players need to know impacts of their assets on system and load-point reliabilities. One tool to specify reliability impacts of assets is the criticality or reliability importance measure by which system components can be ranked based on their effect on reliability. Conventional methods for determination of reliability importance are essentially on the basis of risk sensitivity analysis and hence, impose prohibitive calculation burden in large power systems. An approach is proposed in this paper to determine reliability importance of energy producers from perspective of consumers or distribution companies in a composite generation and transmission system. In the presented method, while avoiding immense computational burden, the energy producers are ranked based on their rating, unavailability and impact on power flows in the lines connecting to the considered load points. Study results on the IEEE reliability test system show successful application of the proposed method. - Research highlights: → Required reliability level at load points is a concern in modern power systems. → It is important to assess reliability importance of energy producers or generators. → Generators can be ranked based on their impacts on power flow to a selected area. → Ranking of generators is an efficient tool to assess their reliability importance.

  18. Final Report for the Virtual Reliability Realization System LDRD

    Energy Technology Data Exchange (ETDEWEB)

    DELLIN, THEODORE A.; HENDERSON, CHRISTOPHER L.; O' TOOLE, EDWARD J.

    2000-12-01

    Current approaches to reliability are not adequate to keep pace with the need for faster, better and cheaper products and systems. This is especially true in high consequence of failure applications. The original proposal for the LDRD was to look at this challenge and see if there was a new paradigm that could make reliability predictions, along with a quantitative estimate of the risk in that prediction, in a way that was faster, better and cheaper. Such an approach would be based on the underlying science models that are the backbone of reliability predictions. The new paradigm would be implemented in two software tools: the Virtual Reliability Realization System (VRRS) and the Reliability Expert System (REX). The three-year LDRD was funded at a reduced level for the first year ($120K vs. $250K) and not renewed. Because of the reduced funding, we concentrated on the initial development of the expertise system. We developed an interactive semiconductor calculation tool needed for reliability analyses. We also were able to generate a basic functional system using Microsoft Siteserver Commerce Edition and Microsoft Sequel Server. The base system has the capability to store Office documents from multiple authors, and has the ability to track and charge for usage. The full outline of the knowledge model has been incorporated as well as examples of various types of content.

  19. Fill Rates of Single-Stage and Multistage Supply Systems

    OpenAIRE

    Matthew J. Sobel

    2004-01-01

    A supply system's fill rate is the fraction of demand that is met from on-hand inventory. This paper presents formulas for the fill rate of periodic review supply systems that use base-stock-level policies. The first part of the paper contains fill-rate formulas for a single-stage system and general distributions of demand. When demand is normally distributed, an exact expression uses only the standard normal distribution and density functions, and a good approximation uses only the standard ...

  20. Usefulness of the Monte Carlo method in reliability calculations

    International Nuclear Information System (INIS)

    Lanore, J.M.; Kalli, H.

    1977-01-01

    Three examples of reliability Monte Carlo programs developed in the LEP (Laboratory for Radiation Shielding Studies in the Nuclear Research Center at Saclay) are presented. First, an uncertainty analysis is given for a simplified spray system; a Monte Carlo program PATREC-MC has been written to solve the problem with the system components given in the fault tree representation. The second program MONARC 2 has been written to solve the problem of complex systems reliability by the Monte Carlo simulation, here again the system (a residual heat removal system) is in the fault tree representation. Third, the Monte Carlo program MONARC was used instead of the Markov diagram to solve the simulation problem of an electric power supply including two nets and two stand-by diesels

  1. System Reliability for LED-Based Products

    Energy Technology Data Exchange (ETDEWEB)

    Davis, J Lynn; Mills, Karmann; Lamvik, Michael; Yaga, Robert; Shepherd, Sarah D; Bittle, James; Baldasaro, Nick; Solano, Eric; Bobashev, Georgiy; Johnson, Cortina; Evans, Amy

    2014-04-07

    Results from accelerated life tests (ALT) on mass-produced commercially available 6” downlights are reported along with results from commercial LEDs. The luminaires capture many of the design features found in modern luminaires. In general, a systems perspective is required to understand the reliability of these devices since LED failure is rare. In contrast, components such as drivers, lenses, and reflector are more likely to impact luminaire reliability than LEDs.

  2. Using operational data to estimate the reliable yields of water-supply wells

    Science.gov (United States)

    Misstear, Bruce D. R.; Beeson, Sarah

    The reliable yield of a water-supply well depends on many different factors, including the properties of the well and the aquifer; the capacities of the pumps, raw-water mains, and treatment works; the interference effects from other wells; and the constraints imposed by ion licences, water quality, and environmental issues. A relatively simple methodology for estimating reliable yields has been developed that takes into account all of these factors. The methodology is based mainly on an analysis of water-level and source-output data, where such data are available. Good operational data are especially important when dealing with wells in shallow, unconfined, fissure-flow aquifers, where actual well performance may vary considerably from that predicted using a more analytical approach. Key issues in the yield-assessment process are the identification of a deepest advisable pumping water level, and the collection of the appropriate well, aquifer, and operational data. Although developed for water-supply operators in the United Kingdom, this approach to estimating the reliable yields of water-supply wells using operational data should be applicable to a wide range of hydrogeological conditions elsewhere. Résumé La productivité d'un puits capté pour l'adduction d'eau potable dépend de différents facteurs, parmi lesquels les propriétés du puits et de l'aquifère, la puissance des pompes, le traitement des eaux brutes, les effets d'interférences avec d'autres puits et les contraintes imposées par les autorisations d'exploitation, par la qualité des eaux et par les conditions environnementales. Une méthodologie relativement simple d'estimation de la productivité qui prenne en compte tous ces facteurs a été mise au point. Cette méthodologie est basée surtout sur une analyse des données concernant le niveau piézométrique et le débit de prélèvement, quand ces données sont disponibles. De bonnes données opérationnelles sont particuli

  3. An intelligent traceability system: Efficient tool for a supply chain sustainability

    Science.gov (United States)

    Bougdira, Abdesselam; Ahaitouf, Abdelaziz; Akharraz, Ismail

    2016-07-01

    The supply chain sustainability becomes a necessity for a smooth, a rapid and a fluid economic transaction. To reach a sustainable supply chain, we propose to focus attention on products and their lifecycle. So, we consider the traceability as a major success key to ensure the supply chain sustainability. For that, we consider a supply chain design that use an intelligent products traced by an intelligent traceability system. This system identifies, restores history and properties of a product, besides it tracks, in real-time a product. This solution can, also, bring, in the product environment, appropriate adjustments to prevent any risk of threatening qualities for the product. So, it helps supply chain contributors making the sustainable adjustments and the instant benchmark of the supply chain sustainability.

  4. Mission reliability of semi-Markov systems under generalized operational time requirements

    International Nuclear Information System (INIS)

    Wu, Xiaoyue; Hillston, Jane

    2015-01-01

    Mission reliability of a system depends on specific criteria for mission success. To evaluate the mission reliability of some mission systems that do not need to work normally for the whole mission time, two types of mission reliability for such systems are studied. The first type corresponds to the mission requirement that the system must remain operational continuously for a minimum time within the given mission time interval, while the second corresponds to the mission requirement that the total operational time of the system within the mission time window must be greater than a given value. Based on Markov renewal properties, matrix integral equations are derived for semi-Markov systems. Numerical algorithms and a simulation procedure are provided for both types of mission reliability. Two examples are used for illustration purposes. One is a one-unit repairable Markov system, and the other is a cold standby semi-Markov system consisting of two components. By the proposed approaches, the mission reliability of systems with time redundancy can be more precisely estimated to avoid possible unnecessary redundancy of system resources. - Highlights: • Two types of mission reliability under generalized requirements are defined. • Equations for both types of reliability are derived for semi-Markov systems. • Numerical methods are given for solving both types of reliability. • Simulation procedure is given for estimating both types of reliability. • Verification of the numerical methods is given by the results of simulation

  5. DC power supplies power management and surge protection for power electronic systems

    CERN Document Server

    Kularatna, Nihal

    2011-01-01

    Modern electronic systems, particularly portable consumer electronic systems and processor based systems, are power hungry, compact, and feature packed. This book presents the most essential summaries of the theory behind DC-DC converter topologies of both linear and switching types. The text discusses power supply characteristics and design specifications based on new developments in power management techniques and modern semiconductors entering into the portable electronics market. The author also addresses off-the-line power supplies, digital control of power supply, power supply protection

  6. Power supply of ETL-TPE 2

    International Nuclear Information System (INIS)

    Takeda, Syohei; Sato, Yasuhiro; Kiyama, Satoru; Ikeda, Nagayasu

    1986-01-01

    The ETL-TPE2 experiment is planned to investigate a behavior of high beta plasma with high temperature. A system design of power supply to generate and to confine the plasma is described. Essential features of the design are the following; 1) To obtain a dense plasma with high temperature, two capacitor banks with opposite polarities of 80 kV charging voltage are provided in tandem feed for the toroidal fast field. 2) A high current pulse with long duration is supplied by a power crowbar system and realizes the investigation of the plasma confinement for a longer pulsed magnetic field. A power supply system of the power crowbar is connected with a main circuit in series through a current transformer. The circuit system is operated at high efficiency and high reliability. 3) In the vertical and compensating field circuits, each rise time and peak value of currents can be controlled over a wide range of pre-set programmings corresponding to an experimental condition. 4) A small resistance is connected with a crowbar circuit in a compression pre-heat field circuit. The circuit can be crowbarred at an arbitrary phase. This operation and the effect of additional resistance are favourable to maintain an effective plasma heating and to improve the plasma confinement. (author)

  7. Optimization of Reliability and Power Consumption in Systems on a Chip

    OpenAIRE

    Simunic, Tajana; Mihic, Kresimir; De Micheli, Giovanni

    2005-01-01

    Aggressive transistor scaling, decreased voltage margins and increased processor power and temperature, have made reliability assessment a much more significant issue in design. Although reliability of devices and interconnect has been broadly studied, here we characterize reliability at the system level. Thus we consider component-based System on Chip designs. Reliability is strongly affected by system temperature, which is in turn driven by power consumption. Thus, component reliability and...

  8. An approach for assessing ALWR passive safety system reliability

    International Nuclear Information System (INIS)

    Hake, T.M.

    1991-01-01

    Many of the advanced light water reactor (ALWR) concepts proposed for the next generation of nuclear power plants rely on passive rather than active systems to perform safety functions. Despite the reduced redundancy of the passive systems as compared to active systems in current plants, the assertion is that the overall safety of the plant is enhanced due to the much higher expected reliability of the passive systems. In order to investigate this assertion, a study is being conducted at Sandia National Laboratories to evaluate the reliability of ALWR passive safety features in the context of probabilistic risk assessment (PRA). The purpose of this paper is to provide a brief overview of the approach to this study. The quantification of passive system reliability is not as straightforward as for active systems, due to the lack of operating experience, and to the greater uncertainty in the governing physical phenomena. Thus, the adequacy of current methods for evaluating system reliability must be assessed, and alternatives proposed if necessary. For this study, the Westinghouse Advanced Passive 600 MWe reactor (AP600) was chosen as the advanced reactor for analysis, because of the availability of AP600 design information. This study compares the reliability of AP600 emergency cooling system with that of corresponding systems in a current generation reactor

  9. OVERVIEW OF THE RHIC INSERTION REGION, SEXTUPOLE, AND SNAKE POWER SUPPLY SYSTEMS

    International Nuclear Information System (INIS)

    BRUNO, D.; ENG, W.; GANETIS, G.; LAMBIASE, R.F.; SANDBERG, J.

    2001-01-01

    The Relativistic Heavy Ion Collider (RHIC) was commissioned in 1999 and 2000. RHIC requires power supplies to supply currents to highly inductive superconducting magnets. The RHIC Insertion Region (IR) contains many shunt power supplies to trim the current of different magnet elements in a large superconducting magnet circuit. There are a total of 237 Insertion Region power supplies in both RHIC rings. RHIC also requires sextupole power supplies. One sextupole power supply is connected across 12 sextupole magnets. There are a total of 24 sextupole power supplies in both rings. Snake magnets are also a part of the RHIC ring, and these snake magnets also require power supplies. There shall be a total of 24 snake power supplies in both rings. Power supply technology, connections, control systems and interfacing with the Quench Protection System will be presented

  10. Sourcing and pricing strategies for two retailers in a decentralized supply chain system under supply disruption

    Directory of Open Access Journals (Sweden)

    M.A. Azarmehr

    2012-01-01

    Full Text Available This paper presents the decentralized supply chain with two suppliers and two competing retailers. It also investigates the sourcing and pricing strategies of two retailers in a decentralized supply chain system under a supply disruption environment. These retailers face their individual stochastic demand markets; however, they compete with each other through a two-stage price and service operation. The interactive dynamics among retailers is characterized, including the existence and uniqueness of the Nash Equilibrium in service and price games demonstrated.

  11. Engineering, maintenance, and initiatives to improve LAMPF beam availability and system reliability

    International Nuclear Information System (INIS)

    Harris, H.W.; DeHaven, R.A.; Hart, V.E.; Parsons, W.M.; Sturrock, J.C.

    1992-01-01

    Two different requirements are driving engineering studies and hardware development to improve LAMPF. The first is concerned with component and system improvements to increase beam availability during the LAMPF production cycle. Hardware changes in RF, power supplies, and magnets are being implemented to increase mean time between failure and reduce time to replace or repair failed units. A joint LAMPF-Industry project is on-going to improve reliability of RF components. A component test stand is being refurbished to include significant development capability. The second approach includes several changes that will increase the duty factor of the existing accelerator. Major changes are being evaluated for replacing the front end of the accelerator. Other changes improving the high brightness capability could result in a new performance plateau for LAMPF. 2 refs., 2 figs

  12. An analytical framework for reliability growth of one-shot systems

    International Nuclear Information System (INIS)

    Hall, J. Brian; Mosleh, Ali

    2008-01-01

    In this paper, we introduce a new reliability growth methodology for one-shot systems that is applicable to the case where all corrective actions are implemented at the end of the current test phase. The methodology consists of four model equations for assessing: expected reliability, the expected number of failure modes observed in testing, the expected probability of discovering new failure modes, and the expected portion of system unreliability associated with repeat failure modes. These model equations provide an analytical framework for which reliability practitioners can estimate reliability improvement, address goodness-of-fit concerns, quantify programmatic risk, and assess reliability maturity of one-shot systems. A numerical example is given to illustrate the value and utility of the presented approach. This methodology is useful to program managers and reliability practitioners interested in applying the techniques above in their reliability growth program

  13. Research on Knowledge-Oriented Supply ChainRisk Management System Model

    OpenAIRE

    Yingchun Guo

    2011-01-01

    Based on analyzing the characteristics of supply chain risk management under the influences of knowledge, in this paper integrates basic theories and methods of knowledge management into the process of risk management, builds a knowledge-oriented supply chain risk management system model, and proposes relevant strategies, presenting references for practical application of knowledge-oriented supply chain risk management. By means of acquiring, storing, sharing, and transferring supply chain ri...

  14. Reliable LED Lighting Technologies: Key Factors and Procurement Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Lynn; Arquit Niederberger, Anne

    2015-10-08

    Abstract— Lighting systems have the ability to transform the economic and educational infrastructure of disadvantaged communities, and eradicating “light poverty” has become one of the primary goals of the International Year of Light 2015. Solid-state lighting (SSL) technology, based on light-emitting diode (LED) light sources, has emerged as the next generation of lighting technology, with a current global market penetration of roughly 5%. This paper will report on recent research on understanding SSL lighting system reliability (failure modes, environmental stressors, electrical power quality); discuss the implications of SSL technology reliability for providing lighting services; and suggest practical approaches to ensure SSL reliability to benefit humanity. Among the key findings from this work is that LED sources can be extremely reliable, withstanding a broad range of environmental stresses without failure. Nonetheless, SSL lighting systems can have a negative impact on electrical power reliability, as well as on the affordability of lighting services, without attention to the quality of the accompanying power infrastructure. It is therefore critical to ensure that the performance of the power supply electronics used in lighting systems is matched to the quality of the power source, when evaluating energy efficient lighting choices.

  15. Engineering systems reliability, safety, and maintenance an integrated approach

    CERN Document Server

    Dhillon, B S

    2017-01-01

    Today, engineering systems are an important element of the world economy and each year billions of dollars are spent to develop, manufacture, operate, and maintain various types of engineering systems around the globe. Many of these systems are highly sophisticated and contain millions of parts. For example, a Boeing jumbo 747 is made up of approximately 4.5 million parts including fasteners. Needless to say, reliability, safety, and maintenance of systems such as this have become more important than ever before.  Global competition and other factors are forcing manufacturers to produce highly reliable, safe, and maintainable engineering products. Therefore, there is a definite need for the reliability, safety, and maintenance professionals to work closely during design and other phases. Engineering Systems Reliability, Safety, and Maintenance: An Integrated Approach eliminates the need to consult many different and diverse sources in the hunt for the information required to design better engineering syste...

  16. Intra- and Interobserver Reliability of Three Classification Systems for Hallux Rigidus.

    Science.gov (United States)

    Dillard, Sarita; Schilero, Christina; Chiang, Sharon; Pham, Peter

    2018-04-18

    There are over ten classification systems currently used in the staging of hallux rigidus. This results in confusion and inconsistency with radiographic interpretation and treatment. The reliability of hallux rigidus classification systems has not yet been tested. The purpose of this study was to evaluate intra- and interobserver reliability using three commonly used classifications for hallux rigidus. Twenty-one plain radiograph sets were presented to ten ACFAS board-certified foot and ankle surgeons. Each physician classified each radiograph based on clinical experience and knowledge according to the Regnauld, Roukis, and Hattrup and Johnson classification systems. The two-way mixed single-measure consistency intraclass correlation was used to calculate intra- and interrater reliability. The intrarater reliability of individual sets for the Roukis and Hattrup and Johnson classification systems was "fair to good" (Roukis, 0.62±0.19; Hattrup and Johnson, 0.62±0.28), whereas the intrarater reliability of individual sets for the Regnauld system bordered between "fair to good" and "poor" (0.43±0.24). The interrater reliability of the mean classification was "excellent" for all three classification systems. Conclusions Reliable and reproducible classification systems are essential for treatment and prognostic implications in hallux rigidus. In our study, Roukis classification system had the best intrarater reliability. Although there are various classification systems for hallux rigidus, our results indicate that all three of these classification systems show reliability and reproducibility.

  17. A multi-state model for the reliability assessment of a distributed generation system via universal generating function

    International Nuclear Information System (INIS)

    Li, Yan-Fu; Zio, Enrico

    2012-01-01

    The current and future developments of electric power systems are pushing the boundaries of reliability assessment to consider distribution networks with renewable generators. Given the stochastic features of these elements, most modeling approaches rely on Monte Carlo simulation. The computational costs associated to the simulation approach force to treating mostly small-sized systems, i.e. with a limited number of lumped components of a given renewable technology (e.g. wind or solar, etc.) whose behavior is described by a binary state, working or failed. In this paper, we propose an analytical multi-state modeling approach for the reliability assessment of distributed generation (DG). The approach allows looking to a number of diverse energy generation technologies distributed on the system. Multiple states are used to describe the randomness in the generation units, due to the stochastic nature of the generation sources and of the mechanical degradation/failure behavior of the generation systems. The universal generating function (UGF) technique is used for the individual component multi-state modeling. A multiplication-type composition operator is introduced to combine the UGFs for the mechanical degradation and renewable generation source states into the UGF of the renewable generator power output. The overall multi-state DG system UGF is then constructed and classical reliability indices (e.g. loss of load expectation (LOLE), expected energy not supplied (EENS)) are computed from the DG system generation and load UGFs. An application of the model is shown on a DG system adapted from the IEEE 34 nodes distribution test feeder.

  18. Reliability and cost/worth evaluation of generating systems utilizing wind and solar energy

    Science.gov (United States)

    Bagen

    The utilization of renewable energy resources such as wind and solar energy for electric power supply has received considerable attention in recent years due to adverse environmental impacts and fuel cost escalation associated with conventional generation. At the present time, wind and/or solar energy sources are utilized to generate electric power in many applications. Wind and solar energy will become important sources for power generation in the future because of their environmental, social and economic benefits, together with public support and government incentives. The wind and sunlight are, however, unstable and variable energy sources, and behave far differently than conventional sources. Energy storage systems are, therefore, often required to smooth the fluctuating nature of the energy conversion system especially in small isolated applications. The research work presented in this thesis is focused on the development and application of reliability and economic benefits assessment associated with incorporating wind energy, solar energy and energy storage in power generating systems. A probabilistic approach using sequential Monte Carlo simulation was employed in this research and a number of analyses were conducted with regards to the adequacy and economic assessment of generation systems containing wind energy, solar energy and energy storage. The evaluation models and techniques incorporate risk index distributions and different operating strategies associated with diesel generation in small isolated systems. Deterministic and probabilistic techniques are combined in this thesis using a system well-being approach to provide useful adequacy indices for small isolated systems that include renewable energy and energy storage. The concepts presented and examples illustrated in this thesis will help power system planners and utility managers to assess the reliability and economic benefits of utilizing wind energy conversion systems, solar energy conversion

  19. Mass and Reliability System (MaRS)

    Science.gov (United States)

    Barnes, Sarah

    2016-01-01

    The Safety and Mission Assurance (S&MA) Directorate is responsible for mitigating risk, providing system safety, and lowering risk for space programs from ground to space. The S&MA is divided into 4 divisions: The Space Exploration Division (NC), the International Space Station Division (NE), the Safety & Test Operations Division (NS), and the Quality and Flight Equipment Division (NT). The interns, myself and Arun Aruljothi, will be working with the Risk & Reliability Analysis Branch under the NC Division's. The mission of this division is to identify, characterize, diminish, and communicate risk by implementing an efficient and effective assurance model. The team utilizes Reliability and Maintainability (R&M) and Probabilistic Risk Assessment (PRA) to ensure decisions concerning risks are informed, vehicles are safe and reliable, and program/project requirements are realistic and realized. This project pertains to the Orion mission, so it is geared toward a long duration Human Space Flight Program(s). For space missions, payload is a critical concept; balancing what hardware can be replaced by components verse by Orbital Replacement Units (ORU) or subassemblies is key. For this effort a database was created that combines mass and reliability data, called Mass and Reliability System or MaRS. The U.S. International Space Station (ISS) components are used as reference parts in the MaRS database. Using ISS components as a platform is beneficial because of the historical context and the environment similarities to a space flight mission. MaRS uses a combination of systems: International Space Station PART for failure data, Vehicle Master Database (VMDB) for ORU & components, Maintenance & Analysis Data Set (MADS) for operation hours and other pertinent data, & Hardware History Retrieval System (HHRS) for unit weights. MaRS is populated using a Visual Basic Application. Once populated, the excel spreadsheet is comprised of information on ISS components including

  20. Reliability analysis of safety systems of nuclear power plant and utility experience with reliability safeguarding of systems during specified normal operation

    International Nuclear Information System (INIS)

    Balfanz, H.P.

    1989-01-01

    The paper gives an outline of the methods applied for reliability analysis of safety systems in nuclear power plant. The main tasks are to check the system design for detection of weak points, and to find possibilities of optimizing the strategies for inspection, inspection intervals, maintenance periods. Reliability safeguarding measures include the determination and verification of the broundary conditions of the analysis with regard to the reliability parameters and maintenance parameters used in the analysis, and the analysis of data feedback reflecting the plant response during operation. (orig.) [de

  1. Development of Probabilistic Reliability Models of Photovoltaic System Topologies for System Adequacy Evaluation

    Directory of Open Access Journals (Sweden)

    Ahmad Alferidi

    2017-02-01

    Full Text Available The contribution of solar power in electric power systems has been increasing rapidly due to its environmentally friendly nature. Photovoltaic (PV systems contain solar cell panels, power electronic converters, high power switching and often transformers. These components collectively play an important role in shaping the reliability of PV systems. Moreover, the power output of PV systems is variable, so it cannot be controlled as easily as conventional generation due to the unpredictable nature of weather conditions. Therefore, solar power has a different influence on generating system reliability compared to conventional power sources. Recently, different PV system designs have been constructed to maximize the output power of PV systems. These different designs are commonly adopted based on the scale of a PV system. Large-scale grid-connected PV systems are generally connected in a centralized or a string structure. Central and string PV schemes are different in terms of connecting the inverter to PV arrays. Micro-inverter systems are recognized as a third PV system topology. It is therefore important to evaluate the reliability contribution of PV systems under these topologies. This work utilizes a probabilistic technique to develop a power output model for a PV generation system. A reliability model is then developed for a PV integrated power system in order to assess the reliability and energy contribution of the solar system to meet overall system demand. The developed model is applied to a small isolated power unit to evaluate system adequacy and capacity level of a PV system considering the three topologies.

  2. Risk-based methods for reliability investments in electric power distribution systems

    Energy Technology Data Exchange (ETDEWEB)

    Alvehag, Karin

    2011-07-01

    Society relies more and more on a continuous supply of electricity. However, while under investments in reliability lead to an unacceptable number of power interruptions, over investments result in too high costs for society. To give incentives for a socio economically optimal level of reliability, quality regulations have been adopted in many European countries. These quality regulations imply new financial risks for the distribution system operator (DSO) since poor reliability can reduce the allowed revenue for the DSO and compensation may have to be paid to affected customers. This thesis develops a method for evaluating the incentives for reliability investments implied by different quality regulation designs. The method can be used to investigate whether socio economically beneficial projects are also beneficial for a profit-maximizing DSO subject to a particular quality regulation design. To investigate which reinvestment projects are preferable for society and a DSO, risk-based methods are developed. With these methods, the probability of power interruptions and the consequences of these can be simulated. The consequences of interruptions for the DSO will to a large extent depend on the quality regulation. The consequences for the customers, and hence also society, will depend on factors such as the interruption duration and time of occurrence. The proposed risk-based methods consider extreme outage events in the risk assessments by incorporating the impact of severe weather, estimating the full probability distribution of the total reliability cost, and formulating a risk-averse strategy. Results from case studies performed show that quality regulation design has a significant impact on reinvestment project profitability for a DSO. In order to adequately capture the financial risk that the DSO is exposed to, detailed riskbased methods, such as the ones developed in this thesis, are needed. Furthermore, when making investment decisions, a risk

  3. Sustainable, Reliable Mission-Systems Architecture

    Science.gov (United States)

    O'Neil, Graham; Orr, James K.; Watson, Steve

    2007-01-01

    A mission-systems architecture, based on a highly modular infrastructure utilizing: open-standards hardware and software interfaces as the enabling technology is essential for affordable and sustainable space exploration programs. This mission-systems architecture requires (a) robust communication between heterogeneous system, (b) high reliability, (c) minimal mission-to-mission reconfiguration, (d) affordable development, system integration, and verification of systems, and (e) minimal sustaining engineering. This paper proposes such an architecture. Lessons learned from the Space Shuttle program and Earthbound complex engineered system are applied to define the model. Technology projections reaching out 5 years are mde to refine model details.

  4. Reliability Evaluation and Improvement Approach of Chemical Production Man - Machine - Environment System

    Science.gov (United States)

    Miao, Yongchun; Kang, Rongxue; Chen, Xuefeng

    2017-12-01

    In recent years, with the gradual extension of reliability research, the study of production system reliability has become the hot topic in various industries. Man-machine-environment system is a complex system composed of human factors, machinery equipment and environment. The reliability of individual factor must be analyzed in order to gradually transit to the research of three-factor reliability. Meanwhile, the dynamic relationship among man-machine-environment should be considered to establish an effective blurry evaluation mechanism to truly and effectively analyze the reliability of such systems. In this paper, based on the system engineering, fuzzy theory, reliability theory, human error, environmental impact and machinery equipment failure theory, the reliabilities of human factor, machinery equipment and environment of some chemical production system were studied by the method of fuzzy evaluation. At last, the reliability of man-machine-environment system was calculated to obtain the weighted result, which indicated that the reliability value of this chemical production system was 86.29. Through the given evaluation domain it can be seen that the reliability of man-machine-environment integrated system is in a good status, and the effective measures for further improvement were proposed according to the fuzzy calculation results.

  5. System reliability, performance and trust in adaptable automation.

    Science.gov (United States)

    Chavaillaz, Alain; Wastell, David; Sauer, Jürgen

    2016-01-01

    The present study examined the effects of reduced system reliability on operator performance and automation management in an adaptable automation environment. 39 operators were randomly assigned to one of three experimental groups: low (60%), medium (80%), and high (100%) reliability of automation support. The support system provided five incremental levels of automation which operators could freely select according to their needs. After 3 h of training on a simulated process control task (AutoCAMS) in which the automation worked infallibly, operator performance and automation management were measured during a 2.5-h testing session. Trust and workload were also assessed through questionnaires. Results showed that although reduced system reliability resulted in lower levels of trust towards automation, there were no corresponding differences in the operators' reliance on automation. While operators showed overall a noteworthy ability to cope with automation failure, there were, however, decrements in diagnostic speed and prospective memory with lower reliability. Copyright © 2015. Published by Elsevier Ltd.

  6. Reliability Standards of Complex Engineering Systems

    Science.gov (United States)

    Galperin, E. M.; Zayko, V. A.; Gorshkalev, P. A.

    2017-11-01

    Production and manufacture play an important role in today’s modern society. Industrial production is nowadays characterized by increased and complex communications between its parts. The problem of preventing accidents in a large industrial enterprise becomes especially relevant. In these circumstances, the reliability of enterprise functioning is of particular importance. Potential damage caused by an accident at such enterprise may lead to substantial material losses and, in some cases, can even cause a loss of human lives. That is why industrial enterprise functioning reliability is immensely important. In terms of their reliability, industrial facilities (objects) are divided into simple and complex. Simple objects are characterized by only two conditions: operable and non-operable. A complex object exists in more than two conditions. The main characteristic here is the stability of its operation. This paper develops the reliability indicator combining the set theory methodology and a state space method. Both are widely used to analyze dynamically developing probability processes. The research also introduces a set of reliability indicators for complex technical systems.

  7. Using an Integrated Hydrologic-Economic Model to Develop Minimum Cost Water Supply Portfolios and Manage Supply Risk

    Science.gov (United States)

    Characklis, G. W.; Ramsey, J.

    2004-12-01

    Water scarcity has become a reality in many areas as a result of population growth, fewer available sources, and reduced tolerance for the environmental impacts of developing the new supplies that do exist. As a result, successfully managing future water supply risk will become more dependent on coordinating the use of existing resources. Toward that end, flexible supply strategies that can rapidly respond to hydrologic variability will provide communities with increasing economic advantages, particularly if the frequency of more extreme events (e.g., drought) increases due to global climate change. Markets for established commodities (e.g., oil, gas) often provide a framework for efficiently responding to changes in supply and demand. Water markets, however, have remained relatively crude, with most transactions involving permanent transfers and long regulatory processes. Recently, interest in the use of flexible short-term transfers (e.g., leases, options) has begun to motivate consideration of more sophisticated strategies for managing supply risk, strategies similar to those used in more mature markets. In this case, communities can benefit from some of the advantages that water enjoys over other commodities, in particular, the ability to accurately characterize the stochastic nature of supply and demand through hydrologic modeling. Hydrologic-economic models are developed for two different water scarce regions supporting active water markets: Edward Aquifer and Lower Rio Grande Valley. These models are used to construct portfolios of water supply transfers (e.g., permanent transfers, options, and spot leases) that minimize the cost of meeting a probabilistic reliability constraint. Real and simulated spot price distributions allow each type of transfer to be priced in a manner consistent with financial theory (e.g., Black-Scholes). Market simulations are integrated with hydrologic models such that variability in supply and demand are linked with price behavior

  8. Contract Coordination in Dual Sourcing Supply Chain under Supply Disruption Risk

    Directory of Open Access Journals (Sweden)

    Tong Shu

    2015-01-01

    Full Text Available This paper explores a coordination model for a three-echelon supply chain including two different manufacturers, one distributer and one retailer via the combined option and back contracts. And one manufacturer provides the high wholesale price with low supply disruption risk and the other is completely the opposite. This differs from the previous supply chain coordination model. Firstly, supply disruption is added to the three-echelon supply chain. Secondly, considering the coordination of the supply chain, we deploy the combined option and back contracts which are seldom used in the previous study. Furthermore, it is interesting that supply disruption risk and buyback factor do not affect the distributor’s order quantity from the manufacturer who has low product price and unreliable operating ability, while the order quantity increases with the rise of option premium and option strike price. The distributor’s order quantity from the manufacturer, which has high product price and reliable operating ability, increases with the rise of supply disruption risk but decreases when the buyback factor, option premium, and option strike price decrease.

  9. Research on Connection and Function Reliability of the Oil&Gas Pipeline System

    Directory of Open Access Journals (Sweden)

    Xu Bo

    2017-01-01

    Full Text Available Pipeline transportation is the optimal way for energy delivery in terms of safety, efficiency and environmental protection. Because of the complexity of pipeline external system including geological hazards, social and cultural influence, it is a great challenge to operate the pipeline safely and reliable. Therefore, the pipeline reliability becomes an important issue. Based on the classical reliability theory, the analysis of pipeline system is carried out, then the reliability model of the pipeline system is built, and the calculation is addressed thereafter. Further the connection and function reliability model is applied to a practical active pipeline system, with the use of the proposed methodology of the pipeline system; the connection reliability and function reliability are obtained. This paper firstly presented to considerate the connection and function reliability separately and obtain significant contribution to establish the mathematical reliability model of pipeline system, hence provide fundamental groundwork for the pipeline reliability research in the future.

  10. Engineering, maintenance, and new initiatives to improve LAMPF beam availability and system reliability

    International Nuclear Information System (INIS)

    Harris, H.W.; DeHaven, R.A.; Hart, V.E.; Parsons, W.M.; Sturrock, J.C.

    1992-01-01

    Two different requirements are driving engineering studies and hardware development to improve LAMPF. The first is concerned with component and system improvements to increase beam availability during the LAMPF production cycle. Hardware changes in RF, power supplies, and magnets are being implemented to increase mean time between failure and reduce time to replace or repair failed units. A joint LAMPF-Industry project is on-going to improve reliability of RF components. A component test stand is being refurbished to include significant development capability. The second approach includes several changes that will increase the duty factor of the existing accelerator. Major changes are being evaluated for replacing the front end of the accelerator. Other changes improving high brightness capability could result in a new performance plateau for LAMPF

  11. Reliability analysis of wind embedded power generation system for ...

    African Journals Online (AJOL)

    This paper presents a method for Reliability Analysis of wind energy embedded in power generation system for Indian scenario. This is done by evaluating the reliability index, loss of load expectation, for the power generation system with and without integration of wind energy sources in the overall electric power system.

  12. Feasibility study for the European Reliability Data System (ERDS)

    International Nuclear Information System (INIS)

    Mancini, G.

    1980-01-01

    In the framework of the Reactor Safety Programme of the Commission of the European Communities, the JRC - Ispra Establishment has performed a feasibility study for an integrated European Reliability Data System, the aim of which is the collection and organization of information related to the operation of LWRs with regard to component and systems behaviour, abnormal occurrences, outages, etc. Component Event Data Bank (CEGB), Abnormal Occurrences Reporting System, Generic Reliability Parameter Data Bank, Operating Unit Status Reports and the main activities carried out during the last two years are described. The most important achievements are briefly reported, such as: Reference Classification for Systems, Components and Failure Events, Informatic Structure of the Pilot Experiment of the CEDB, Information Retrieval System for Abnormal Occurrences Reports, Data Bank on Component Reliability Parameters, System on the Exchange of Operation Experience of LWRs, Statistical Data Treatment. Finally, the general conclusions of the feasibility study are summarized: the possibility and the usefulness for the creation of an integrated European Reliability Data System are outlined. (author)

  13. Application of embedded database to digital power supply system in HIRFL

    International Nuclear Information System (INIS)

    Wu Guanghua; Yan Huaihai; Chen Youxin; Huang Yuzhen; Zhou Zhongzu; Gao Daqing

    2014-01-01

    Background: This paper introduces the application of embedded MySQL database in the real-time monitoring system of the digital power supply system in Heavy Ion Research Facility in Lanzhou (HIRFL). Purpose: The aim is to optimize the real-time monitoring system of the digital power supply system for better performance. Methods: The MySQL database is designed and implemented under Linux operation system running on ARM processor, together with the related functions for real-time data monitoring, such as collection, storage and query. All status parameters of digital power supply system is collected and communicated with ARM by a FPGA, whilst the user interface is realized by Qt toolkits at ARM end. Results: The actual operation indicates that digital power supply can realize the function of real-time data monitoring, collection, storage and so on. Conclusion: Through practical application, we have found some aspects we can improve and we will try to optimize them in the future. (authors)

  14. [Comparison of different types automatic water-supply system for mouse rearing (author's transl)].

    Science.gov (United States)

    Kikuchi, S; Suzuki, M; Tagashira, Y

    1979-04-01

    Rearing and breeding scores were compared between groups of mice (JCL : ICR and ddN strains) raised with two different types of automatic water-supply systems; the Japanese type and the American type, using manual water-supply system as control. The mice raised with the manual water-supply system were superior in body weight gain as compared to those with two automatic water-supply systems. As to the survival rate, however, the m; anual water-supply system and the Japanese type gave better results than the American type. As to weanling rate in the breeding test, the manual water-supply system gave somewhat better result than either of the two automatic types. Accidental water leaks, which are serious problems of automatic systems, occurred frequently only when the American type was used. Only one defect of the Japanese type revealed was that it was unfavorable for mice with smaller size (e.g., young ddN mice), resulting in lower body weight gain as well as lower breeding scores.

  15. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  16. Reliability-oriented energy storage sizing in wind power systems

    DEFF Research Database (Denmark)

    Qin, Zian; Liserre, Marco; Blaabjerg, Frede

    2014-01-01

    Energy storage can be used to suppress the power fluctuations in wind power systems, and thereby reduce the thermal excursion and improve the reliability. Since the cost of the energy storage in large power application is high, it is crucial to have a better understanding of the relationship...... between the size of the energy storage and the reliability benefit it can generate. Therefore, a reliability-oriented energy storage sizing approach is proposed for the wind power systems, where the power, energy, cost and the control strategy of the energy storage are all taken into account....... With the proposed approach, the computational effort is reduced and the impact of the energy storage system on the reliability of the wind power converter can be quantified....

  17. Alternative off-site power supply improves nuclear power plant safety

    International Nuclear Information System (INIS)

    Gjorgiev, Blaže; Volkanovski, Andrija; Kančev, Duško; Čepin, Marko

    2014-01-01

    Highlights: • Additional power supply for mitigation of the station blackout event in NPP is used. • A hydro power plant is considered as an off-site alternative power supply. • An upgrade of the probabilistic safety assessment from its traditional use is made. • The obtained results show improvement of nuclear power plant safety. - Abstract: A reliable power system is important for safe operation of the nuclear power plants. The station blackout event is of great importance for nuclear power plant safety. This event is caused by the loss of all alternating current power supply to the safety and non-safety buses of the nuclear power plant. In this study an independent electrical connection between a pumped-storage hydro power plant and a nuclear power plant is assumed as a standpoint for safety and reliability analysis. The pumped-storage hydro power plant is considered as an alternative power supply. The connection with conventional accumulation type of hydro power plant is analysed in addition. The objective of this paper is to investigate the improvement of nuclear power plant safety resulting from the consideration of the alternative power supplies. The safety of the nuclear power plant is analysed through the core damage frequency, a risk measure assess by the probabilistic safety assessment. The presented method upgrades the probabilistic safety assessment from its common traditional use in sense that it considers non-plant sited systems. The obtained results show significant decrease of the core damage frequency, indicating improvement of nuclear safety if hydro power plant is introduced as an alternative off-site power source

  18. Can Slovakia secure reliable electricity supply without nuclear?

    International Nuclear Information System (INIS)

    Pnacek, I.

    2004-01-01

    In this presentation author deals with structure of electricity production in the Slovak republic in 2006 and perspectives of electricity supply up to 2020 year. Decommissioning of Unit 1 and Unit 2 of the Bohunice NPP and completion of Unit 3 and 4 of the Mochovce NPP are discussed

  19. Development of high-reliability control system for nuclear power plants

    International Nuclear Information System (INIS)

    Asami, K.; Yanai, K.; Hirose, H.; Ito, T.

    1983-01-01

    In Japan, many nuclear power generating plants are in operation and under construction. There is a general awareness of the problems in connection with nuclear power generation and strong emphasis is put on achieving highly reliable operation of nuclear power plants. Hitachi has developed a new high-reliability control system. NURECS-3000 (NUclear Power Plant High-REliability Control System), which is applied to the main control systems, such as the reactor feedwater control system, the reactor recirculation control system and the main turbine control system. The NURECS-3000 system was designed taking into account the fact that there will be failures, but the aim is for the system to continue to function correctly; it is therefore a fault-tolerant system. It has redundant components which can be completely isolated from each other in order to prevent fault propagation. The system has a hierarchical configuration, with a main controller, consisting of a triplex microcomputer system, and sub-loop controllers. Special care was taken to ensure the independence of these subsystems. Since most of the redundant system failures are caused by common-mode failures and the reliability of redundant systems depends on the reliability of the common-mode parts, the aim was to minimize these parts. (author)

  20. Optics Supply Planning System

    International Nuclear Information System (INIS)

    Gaylord, J.

    2009-01-01

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system