WorldWideScience

Sample records for supernemo project study

  1. Development of an optical simulation for the SuperNEMO calorimeter

    Science.gov (United States)

    Huber, Arnaud; SuperNEMO Collaboration

    2017-09-01

    The SuperNEMO double beta decay project is a modular tracker-calorimeter based experiment. The aim of this project is to reach a sensitivity of the order of 1026 years concerning the neutrinoless double beta decay half-life, corresponding to a Majorana neutrino mass of 50-100 meV. The main calorimeter of the SuperNEMO demonstrator is based on 520 Optical Modules made of large volume plastic scintillators (10L) coupled with large area photomultipliers (Hamamatsu R5912-MOD and R6594). The design of the calorimeter is optimized for the double beta decay detection and allows gamma tagging for background rejection. In large volumes of scintillators, a similar deposited energy by electrons or photons will give different visible energy and signal shapes due to different interactions inside the scintillator. The aim of the optical simulation, developed for SuperNEMO, is to model the Optical Module response on the energy and time performances, regarding the particle type.

  2. Low background techniques for SuperNEMO

    International Nuclear Information System (INIS)

    Liu, Xin Ran; Mott, James

    2015-01-01

    The UK contribution to achieving the ultra-low background conditions required inside the detectors of the SuperNEMO experiment are described. A dedicated facility has been established for the screening and selection of materials through gamma ray spectroscopy using germanium detectors. Initial results from two detectors are shown. The radon level inside the SuperNEMO detector must be less than 150 μBq/m 3 in order to achieve the target sensitivity. A Radon Concentration Line (RnCL) has been developed capable of measuring radon levels in large gas volumes down to 5 μBq/m 3 , improving on standard state-of-the-art radon detectors by 3 orders of magnitude. The development, commissioning and first measurements of radon content using the RnCL are also presented. (paper)

  3. Background constrains of the SuperNEMO experiment for neutrinoless double beta-decay searches

    Energy Technology Data Exchange (ETDEWEB)

    Povinec, Pavel P.

    2017-02-11

    The SuperNEMO experiment is a new generation of experiments dedicated to the search for neutrinoless double beta-decay, which if observed, would confirm the existence of physics beyond the Standard Model. It is based on the tracking and calorimetry techniques, which allow the reconstruction of the final state topology, including timing and kinematics of the double beta-decay transition events, offering a powerful tool for background rejection. While the basic detection strategy of the SuperNEMO detector remains the same as of the NEMO-3 detector, a number of improvements were accomplished for each of detector main components. Upgrades of the detector technologies and development of low-level counting techniques ensure radiopurity control of construction parts of the SuperNEMO detector. A reference material made of glass pellets has been developed to assure quality management and quality control of radiopurity measurements. The first module of the SuperNEMO detector (Demonstrator) is currently under construction in the Modane underground laboratory. No background event is expected in the neutrinoless double beta-decay region in 2.5 years of its operation using 7 kg of {sup 82}Se. The half-life sensitivity of the Demonstrator is expected to be >6.5·10{sup 24} y, corresponding to an effective Majorana neutrino mass sensitivity of |0.2−0.4| eV (90% C.L.). The full SuperNEMO experiment comprising of 20 modules with 100 kg of {sup 82}Se source should reach an effective Majorana neutrino mass sensitivity of |0.04−0.1| eV, and a half-life limit 1·10{sup 26} y. - Highlights: • SuperNEMO detector for 2β0ν-decay of {sup 82}Se should reach half-life limit of 10{sup 26} y. • Radiopurity of the SuperNEMO internal detector parts was checked down to 0.1 mBq/kg. • Reference material of glass pellets was developed for underground γ-spectrometry.

  4. Strategy of HPGe screening measurements in the SuperNEMO experiment

    Energy Technology Data Exchange (ETDEWEB)

    Perrot, Frédéric [Université de Bordeaux, Centre d' Etudes Nucléaires de Bordeaux Gradignan, UMR 5797, Chemin du Solarium, Le Haut-Vigneau, BP120, F-33175 Gradignan, France and CNRS/IN2P3, Centre d' Etudes Nucléaires de Bordeaux Gradignan, UMR 5797 (France); Collaboration: SuperNEMO Collaboration

    2013-08-08

    SuperNEMO is a double beta decay experiment that will use a tracko-calorimeter technique. The goal is to reach a sensitivity of T{sub 1/2}(0ν)>10{sup 26} y corresponding to an effective Majorana neutrino mass of 0.04-0.11 eV with 100 kg of {sup 82}Se. The general strategy of the HPGe screening measurements is described for the materials of the SuperNEMO demonstrator, regarding their radiopurity and their location. The two platforms, PRISNA and LSM, used for this screening are also briefly described.

  5. Radon emanation chamber: High sensitivity measurements for the SuperNEMO experiment

    Energy Technology Data Exchange (ETDEWEB)

    Soulé, B. [Université Bordeaux 1, Centre d' Etudes Nucléaires de Bordeaux Gradignan, UMR 5797, Chemin du Solarium, Le Haut-Vigneau, BP120, F-33175 Gradignan (France); Collaboration: SuperNEMO Collaboration; and others

    2013-08-08

    Radon is a well-known source of background in ββ0ν experiments due to the high Q{sub β} value of one of its daughter nucleus, {sup 214}Bi. The SuperNEMO collaboration requires a maximum radon contamination of 0.1 mBq/m{sup 3} inside its next-generation double beta decay detector. To reach such a low activity, a drastic screening process has been set for the selection of the detector's materials. In addition to a good radiopurity, a low emanation rate is required. To test this parameter, a Radon Emanation Setup is running at CENBG. It consists in a large emanation chamber connected to an electrostatic detector. By measuring large samples and having a low background level, this setup reaches a sensitivity of a few μ Bq. m{sup −2}. d{sup −1} and is able to qualify materials used in the construction of the SuperNEMO detector.

  6. Probing new physics models of neutrinoless double beta decay with SuperNEMO

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, R. [CNRS/IN2P3, IPHC, Universite de Strasbourg, Strasbourg (France); Augier, C.; Bongrand, M.; Garrido, X.; Jullian, S.; Sarazin, X.; Simard, L. [CNRS/IN2P3, LAL, Universite Paris-Sud 11, Orsay (France); Baker, J.; Caffrey, A.J.; Horkley, J.J.; Riddle, C.L. [INL, Idaho Falls, ID (United States); Barabash, A.S.; Konovalov, S.I.; Umatov, V.I.; Vanyushin, I.A. [Institute of Theoretical and Experimental Physics, Moscow (Russian Federation); Basharina-Freshville, A.; Evans, J.J.; Flack, R.; Holin, A.; Kauer, M.; Richards, B.; Saakyan, R.; Thomas, J.; Vasiliev, V.; Waters, D. [University College London, London (United Kingdom); Brudanin, V.; Egorov, V.; Kochetov, O.; Nemchenok, I.; Timkin, V.; Tretyak, V.; Vasiliev, R. [Joint Institute for Nuclear Research, Dubna (Russian Federation); Cebrian, S.; Dafni, T.; Irastorza, I.G.; Gomez, H.; Iguaz, F.J.; Luzon, G.; Rodriguez, A. [University of Zaragoza, Zaragoza (Spain); Chapon, A.; Durand, D.; Guillon, B.; Mauger, F. [Universite de Caen, LPC Caen, ENSICAEN, Caen (France); Chauveau, E.; Hubert, P.; Hugon, C.; Lutter, G.; Marquet, C.; Nachab, A.; Nguyen, C.H.; Perrot, F.; Piquemal, F.; Ricol, J.S. [UMR 5797, Universite de Bordeaux, Centre d' Etudes Nucleaires de Bordeaux Gradignan, Gradignan (France); UMR 5797, CNRS/IN2P3, Centre d' Etudes Nucleaires de Bordeaux Gradignan, Gradignan (France); Deppisch, F.F.; Jackson, C.M.; Nasteva, I.; Soeldner-Rembold, S. [Univ. of Manchester (United Kingdom); Diaz, J.; Monrabal, F.; Serra, L.; Yahlali, N. [CSIC - Univ. de Valencia, IFIC (Spain); Fushima, K.I. [Tokushima Univ., Tokushima (Japan); Holy, K.; Povinec, P.P.; Simkovic, F. [Comenius Univ., FMFI, Bratislava (Slovakia); Ishihara, N. [KEK, Tsukuba, Ibaraki (Japan); Kovalenko, V. [CNRS/IN2P3, IPHC, Univ. de Strasbourg (France); Joint Inst. for Nuclear Research, Dubna (Russian Federation); Lamhamdi, T. [USMBA, Fes (Morocco); Lang, K.; Pahlka, R.B. [Univ. of Texas, Austin, TX (United States)] (and others)

    2010-12-15

    The possibility to probe new physics scenarios of light Majorana neutrino exchange and right-handed currents at the planned next generation neutrinoless double {beta} decay experiment SuperNEMO is discussed. Its ability to study different isotopes and track the outgoing electrons provides the means to discriminate different underlying mechanisms for the neutrinoless double {beta} decay by measuring the decay half-life and the electron angular and energy distributions. (orig.)

  7. Spectral modeling of scintillator for the NEMO-3 and SuperNEMO detectors

    Energy Technology Data Exchange (ETDEWEB)

    Argyriades, J. [LAL, Universite Paris-Sud, CNRS/IN2P3, F-91405 Orsay (France); Arnold, R. [IPHC, Universite de Strasbourg, CNRS/IN2P3, F-67037 Strasbourg (France); Augier, C. [LAL, Universite Paris-Sud, CNRS/IN2P3, F-91405 Orsay (France); Baker, J. [INL, Idaho Falls, 83415 (United States); Barabash, A.S. [Institute of Theoretical and Experimental Physics, 117259 Moscow (Russian Federation); Bongrand, M.; Broudin-Bay, G. [LAL, Universite Paris-Sud, CNRS/IN2P3, F-91405 Orsay (France); Brudanin, V.B. [Joint Institute for Nuclear Research, 141980 Dubna (Russian Federation); Caffrey, A.J. [INL, Idaho Falls, 83415 (United States); Cebrian, S. [University of Zaragoza, C/ Pedro Cerbuna 12, 50009 Zaragoza (Spain); Chapon, A. [LPC Caen, ENSICAEN, Universite de Caen, CNRS/IN2P3, F-14032 Caen (France); Chauveau, E. [CNRS/IN2P3, Centre d' Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France); Universite de Bordeaux, Centre d' Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France); Dafni, Th. [University of Zaragoza, C/ Pedro Cerbuna 12, 50009 Zaragoza (Spain); Daraktchieva, Z. [University College London, WC1E 6BT London (United Kingdom); Diaz, J. [IFIC, CSIC - Universidad de Valencia, Valencia (Spain); Durand, D. [LPC Caen, ENSICAEN, Universite de Caen, CNRS/IN2P3, F-14032 Caen (France); Egorov, V.G. [Joint Institute for Nuclear Research, 141980 Dubna (Russian Federation); Evans, J.J. [University College London, WC1E 6BT London (United Kingdom); Fatemi-Ghomi, N. [University of Manchester, M13 9PL Manchester (United Kingdom); Flack, R. [University College London, WC1E 6BT London (United Kingdom)

    2011-01-01

    We have constructed a GEANT4-based detailed software model of photon transport in plastic scintillator blocks and have used it to study the NEMO-3 and SuperNEMO calorimeters employed in experiments designed to search for neutrinoless double beta decay. We compare our simulations to measurements using conversion electrons from a calibration source of {sup 207}Bi and show that the agreement is improved if wavelength-dependent properties of the calorimeter are taken into account. In this article, we briefly describe our modeling approach and results of our studies.

  8. Development of high performance and very low radioactivity scintillation counters for the SuperNEMO calorimeter

    International Nuclear Information System (INIS)

    Chauveau, E.

    2010-11-01

    SuperNEMO is a next generation double beta decay experiment which will extend the successful 'tracko-calo' technique employed in NEMO 3. The main characteristic of this type of detector is to identify not only double beta decays, but also to measure its own background components. The project aims to reach a sensitivity up to 10 26 years on the half-life of 82 Se. One of the main challenge of the Research and Development is to achieve an unprecedented energy resolution for the electron calorimeter, better than 8 % FWHM at 1 MeV. This thesis contributes to improve scintillators and photomultipliers performances and reduce their radioactivity, including in particular the development of a new photomultiplier in collaboration with Photonis. (author)

  9. Results of the BiPo-1 prototype for radiopurity measurements for the SuperNEMO double beta decay source foils

    Energy Technology Data Exchange (ETDEWEB)

    Argyriades, J. [LAL, Universite Paris-Sud, CNRS/IN2P3, F-91405 Orsay (France); Arnold, R. [IPHC, Universite de Strasbourg, CNRS/IN2P3, F-67037 Strasbourg (France); Augier, C. [LAL, Universite Paris-Sud, CNRS/IN2P3, F-91405 Orsay (France); Baker, J. [INL, Idaho Falls, ID 83415 (United States); Barabash, A.S. [Institute of Theoretical and Experimental Physics, 117259 Moscow (Russian Federation); Basharina-Freshville, A. [University College London, WC1E 6BT London (United Kingdom); Bongrand, M.; Bourgeois, C.; Breton, D.; Briere, M.; Broudin-Bay, G. [LAL, Universite Paris-Sud, CNRS/IN2P3, F-91405 Orsay (France); Brudanin, V.B. [Joint Institute for Neear Research, 141980 Dubna (Russian Federation); Caffrey, A.J. [INL, Idaho Falls, ID 83415 (United States); Carcel, S. [Instituto de Fisica Corpuscular, CSIC, Universidad de Valencia, Valencia (Spain); Cebrian, S. [Instituto de Fisica Nuclear y Altas Energias, Universidad de Zaragoza, Zaragoza (Spain); Chapon, A. [LPC Caen, ENSICAEN, Universite de Caen, CNRS/IN2P3, F-14032 Caen (France); Chauveau, E. [CNRS/IN2P3, Centre d' Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France); Universite de Bordeaux, Centre d' Etudes Nucleaires de Bordeaux Gradignan, UMR 5797, F-33175 Gradignan (France); Dafni, Th. [Instituto de Fisica Nuclear y Altas Energias, Universidad de Zaragoza, Zaragoza (Spain); Diaz, J. [Instituto de Fisica Corpuscular, CSIC, Universidad de Valencia, Valencia (Spain); Durand, D. [LPC Caen, ENSICAEN, Universite de Caen, CNRS/IN2P3, F-14032 Caen (France)

    2010-10-01

    The development of BiPo detectors is dedicated to the measurement of extremely high radiopurity in {sup 208}Tl and {sup 214}Bi for the SuperNEMO double beta decay source foils. A modular prototype, called BiPo-1, with 0.8 m{sup 2} of sensitive surface area, has been running in the Modane Underground Laboratory since February, 2008. The goal of BiPo-1 is to measure the different components of the background and in particular the surface radiopurity of the plastic scintillators that make up the detector. The first phase of data collection has been dedicated to the measurement of the radiopurity in {sup 208}Tl. After more than one year of background measurement, a surface activity of the scintillators of A({sup 208}Tl)=1.5{mu}Bq/m{sup 2} is reported here. Given this level of background, a larger BiPo detector having 12 m{sup 2} of active surface area, is able to qualify the radiopurity of the SuperNEMO selenium double beta decay foils with the required sensitivity of A({sup 208}Tl)<2{mu}Bq/kg (90% C.L.) with a six month measurement.

  10. Neutrino Physics without Neutrinos: Recent results from the NEMO-3 experiment and plans for SuperNEMO

    CERN Multimedia

    CERN. Geneva

    2015-01-01

    The observation of neutrino oscillations has proved that neutrinos have mass. This discovery has renewed and strengthened the interest in neutrinoless double beta decay experiments which provide the only practical way to determine whether neutrinos are Majorana or Dirac particles. The recently completed NEMO-3 experiment, located in the Laboratoire Souterrain de Modane in the Frejus Tunnel, was an experiment searching for neutrinoless double beta decays using a powerful technique for detecting a two-electron final state by employing an apparatus combining tracking, calorimetry, and the time-of-flight measurements. We will present latest results from NEMO-3 and will discuss the status of SuperNEMO, the next generation experiment that will exploit the same experimental technique to extend the sensitivity of the current search.

  11. Double-beta decay measurement of 100Mo to the excited 01+ state of 100Ru in the NEMO3 experiment - R/D program for SuperNEMO: development of a BiPo detector to measure ultra low contaminations in the source foils

    International Nuclear Information System (INIS)

    Chapon, A.

    2011-10-01

    The NEMO3 detector was designed for the study of double beta decay and in particular the search for neutrinoless double beta decay (ββ0ν). The quantity of 100 Mo in the detector (7 kg) allows also a competitive measurement of the two-neutrino double beta decay (ββ2ν) of 100 Mo to the excited 0 1 + state of 100 Ru (eeNγ channel). Monte-Carlo simulations of the effect and of all the possible sources of background have been studied in order to determine their contributions to the full NEMO3 experimental data (2003-2011). These one have then been analysed: the ββ2ν decay half-life has been measured, and a limit on the ββ0ν decay has been obtained. Moreover, the SuperNEMO experiment aims to reach a sensitivity up to 10 26 years on the half-life of neutrinoless double beta decay. The SuperNEMO detector radioactivity has to be as low as possible. Especially radio-purity levels of 2 μBq*kg -1 in 208 Tl and 10 μBq*kg -1 in 214 Bi are required for the source foils. The gamma-spectrometry can not measure such low contamination levels. Hence, a BiPo dedicated detector has been developed to measure 208 Tl and 214 Bi contaminations, identifying the Bi→Po→Pb β-α chains. A proof of principle has been performed and the detector background has been measured. Assuming these values, a full BiPo detector of 3.6 m 2 can achieve the required sensitivities for the SuperNEMO source foils within six months of measurement. (author)

  12. Study and development of microporous organic compounds for radon adsorption and his application in particle physics

    International Nuclear Information System (INIS)

    Noel, Raymond

    2015-01-01

    The neutrino is one of the twelve elementary particles from the standard model. It is characterize by a neutral electrical charge and an extremely low mass. Many experiments have been set up in order to study the properties of neutrino. Despite scientific breakthrough, the nature of this particle is still unknown up to now. The NEMO collaboration is studying the neutrinoless double beta decay, a very rare radioactive process, to find out the nature of neutrino and to know if the neutrino is equivalent to the antineutrino. Today, the NEMO collaboration is building a new detector called SuperNEMO. The gas inside the detector need to have a concentration in radon below 100 μBq/m"3, to minimize the radioactive background. The purification of this gas is achieved from the adsorption of radon by microporous material. In this work, we have developed in CPPM a bench test to measure the radon adsorption by various materials, in order to propose an adsorption model, and to reach the purity condition needed for SuperNEMO. Along with the study on adsorbents available and to better understand the radon adsorption, we synthesized and studied at CINaM star-shape poly-aromatic hydrocarbons and branched or dendritic aromatic polymers, incorporating sulfur, to adsorb radon [fr

  13. Radiochemical separation of mostly short-lived neutron activation products

    Czech Academy of Sciences Publication Activity Database

    Kučera, Jan; Kameník, Jan; Povinec, P. P.

    2017-01-01

    Roč. 311, č. 2 (2017), s. 1299-1307 ISSN 0236-5731. [1st International Conference on Radioanalytical and Nuclear chemistry (RANC). Budapest, 10.04.2016-15.04.2016] R&D Projects: GA ČR(CZ) GBP108/12/G108 Institutional support: RVO:61389005 Keywords : determination * Vanadium * Iodine * Manganese * Silicon * Mercury * Selenium * Th-232 anad U-238 * SuperNEMO experiment Subject RIV: CB - Analytical Chemistry, Separation OBOR OECD: Analytical chemistry Impact factor: 1.282, year: 2016

  14. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  15. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  16. Simulation of double beta decay in the 'SeXe' TPC

    Energy Technology Data Exchange (ETDEWEB)

    Mauger, F [LPC Caen and University of Caen, ENSICAEN, 6 Bd Marechal Juin, 14050 CAEN CEDEX 4 (France)

    2007-04-15

    In 2004, the NEMO collaboration has started some preliminary studies for a next-generation double beta decay experiment: SuperNEMO. The possibility to use a large gaseous TPC has been investigated using simulation and extrapolation of former experiments. In this talk, I report on the reasons why such techniques have not been selected in 2004 and led the NEMO collaboration to reuse the techniques implemented within the NEMO3 detector.

  17. Simulation of double beta decay in the ''SeXe'' TPC

    Science.gov (United States)

    Mauger, F.

    2007-04-01

    In 2004, the NEMO collaboration has started some preliminary studies for a next-generation double beta decay experiment: SuperNEMO. The possibility to use a large gaseous TPC has been investigated using simulation and extrapolation of former experiments. In this talk, I report on the reasons why such techniques have not been selected in 2004 and led the NEMO collaboration to reuse the techniques implemented within the NEMO3 detector.

  18. Great Basin paleoenvironmental studies project

    International Nuclear Information System (INIS)

    1993-01-01

    Project goals, project tasks, progress on tasks, and problems encountered are described and discussed for each of the studies that make up the Great Basin Paleoenvironmental Studies Project for Yucca Mountain. These studies are: Paleobotany, Paleofauna, Geomorphology, and Transportation. Budget summaries are also given for each of the studies and for the overall project

  19. Nemo-3 experiment assets and limitations. Perspective for the double β physics

    International Nuclear Information System (INIS)

    Augier, C.

    2005-06-01

    After an introduction to this report in Chapter 1, I present a status of our knowledge in neutrino physics in Chapter 2. Then, I detail in Chapter 3 all the choices made for the design and realisation of the NEMO 3 detector for the research of double beta decay process. Performance of the detector is presented, concerning both the capacity of the detector to identify the backgrounds and the ability to study all the ββ process. I also explain the methods chosen by the NEMO collaboration to reduce the radon activity inside the detector and to make this background negligible today. This chapter, which is written in English, is the 'Technical report of the NEMO 3 detector' and forms an independent report for the NEMO collaborators. I finish this report in Chapter 4 with a ten years prospect for experimental projects in physics, with both the SuperNEMO project and its experiment program, and also by comparing the most interesting experiments, CUORE and GERDA, showing as an example the effect of nuclear matrix elements on the neutrino effective mass measurement. (author)

  20. Project studies and engaged scholarship

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2016-01-01

    and to rejuvenate these research directions. Design/methodology/approach The authors propose the umbrella term: “project studies” to denote the research related to projects and temporary organizing. Project studies is conceived not only as a body of research, but also as a social process embedded in research...... scholars, who’s “job” goes beyond the writing of articles and research applications, and includes shaping discourses of project research, nurturing new project scholars, contributing to project practice and carefully considering the legacy of projects and project studies in society. Originality......Purpose In 2006, the “Rethinking Project Management” network called for a paradigm shift in project research, and proposed five research directions. The directions inspired research and marked a milestone in the development of the field. The purpose of this paper is to reflect on the past decade...

  1. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  2. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  3. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    Science.gov (United States)

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  4. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  5. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  6. Project description and crowdfunding success: an exploratory study.

    Science.gov (United States)

    Zhou, Mi Jamie; Lu, Baozhou; Fan, Weiguo Patrick; Wang, G Alan

    2018-01-01

    Existing research on antecedent of funding success mainly focuses on basic project properties such as funding goal, duration, and project category. In this study, we view the process by which project owners raise funds from backers as a persuasion process through project descriptions. Guided by the unimodel theory of persuasion, this study identifies three exemplary antecedents (length, readability, and tone) from the content of project descriptions and two antecedents (past experience and past expertise) from the trustworthy cue of project descriptions. We then investigate their impacts on funding success. Using data collected from Kickstarter, a popular crowdfunding platform, we find that these antecedents are significantly associated with funding success. Empirical results show that the proposed model that incorporated these antecedents can achieve an accuracy of 73 % (70 % in F-measure). The result represents an improvement of roughly 14 percentage points over the baseline model based on informed guessing and 4 percentage points improvement over the mainstream model based on basic project properties (or 44 % improvement of mainstream's performance over informed guessing). The proposed model also has superior true positive and true negative rates. We also investigate the timeliness of project data and find that old project data is gradually becoming less relevant and losing predictive power to newly created projects. Overall, this study provides evidence that antecedents identified from project descriptions have incremental predictive power and can help project owners evaluate and improve the likelihood of funding success.

  7. Project ATTACK and Project VISTA: Benchmark studies on the road to NATO's early TNF policy

    International Nuclear Information System (INIS)

    Garrity, P.J.

    1994-01-01

    This paper is concerned with those studies and analyses that affected early NATO nuclear policy and force structure. The discussion focuses specifically on two open-quotes benchmarkclose quotes activities. Project VISTA and Project ATTACK. These two studies were chosen less because one can document their direct impact on NATO nuclear policy and more because they capture the state of thinking about tactical nuclear weapons at a particular point of time. Project VISTA offers an especially important benchmark in this respect. Project ATTACK is a rather different kind of benchmark. It is not a pathbreaking study. It is much narrower and more technical than VISTA. It appears to have received no public attention. Project ATTACK is interesting because it seems to capture a open-quotes nuts-and-boltsclose quotes feel for how U.S. (and thereby NATO) theater nuclear policy was evolving prior to MC 48. The background and context for Project VISTA and Project ATTACK are presented and discussed

  8. Scoping study into community-based renewable energy projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This scoping study has been carried out by the Centre for Sustainable Energy (CSE), a charity which promotes energy efficiency and renewable energy. CSE have used their involvement in the development of the Energy Club (the first energy service company for householders in the UK) and the Bristol Environment and Energy Trust (a cross-sector organisation initiating environmental projects) as the basis of the study. This study is the first phase of a long term project to set up two small-scale renewable energy schemes to demonstrate the benefits of a community based approach. Specific objectives of the study were: to identify, quantify and cost, renewable energy resources for interested community organisations; to evaluate two routes for developing community based projects - Environment Trusts and Energy Clubs'; to organise a seminar with the objective of bringing together community interest groups with experts in renewable energy; to identify two communities with viable renewable projects for the next phase - full feasibility studies/pilot projects. (author)

  9. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  10. Spent nuclear fuel project design basis capacity study

    Energy Technology Data Exchange (ETDEWEB)

    Cleveland, K.J.

    1996-09-09

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

  11. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  12. NDM06: 2. symposium on neutrinos and dark matter in nuclear physics

    Energy Technology Data Exchange (ETDEWEB)

    Akerib, D; Arnold, R; Balantekin, A; Barabash, A; Barnabe, H; Baroni, S; Baussan, E; Bellini, F; Bobisut, F; Bongrand, M; Brofferio, Ch; Capolupo, A; Enrico, Carrara; Caurier, E; Cermak, P; Chardin, G; Civitarese, O; Couchot, F; Kerret, H de; Heros, C de los; Detwiler, J; Dracos, M; Drexlin, G; Efremenko, Y; Ejiri, H; Falchini, E; Fatemi-Ghomi, N; Finger, M Ch; Finger Miroslav, Ch; Fiorillo, G; Fiorini, E; Fracasso, S; Frekers, D; Fushimi, K I; Gascon, J; Genest, M H; Georgadze, A; Giuliani, A; Goeger-Neff, M; Gomez-Cadenas, J J; Greenfield, M; H de Jesus, J; Hallin, A; Hannestad, St; Hirai, Sh; Hoessl, J; Ianni, A; Ieva, M B; Ishihara, N; Jullian, S; Kaim, S; Kajino, T; Kayser, B; Kochetov, O; Kopylov, A; Kortelainen, M; Kroeninger, K; Lachenmaier, T; Lalanne, D; Lanfranchi, J C; Lazauskas, R; Lemrani, A R; Li, J; Mansoulie, B; Marquet, Ch; Martinez, J; Mirizzi, A; Morfin Jorge, G; Motz, H; Murphy, A; Navas, S; Niedermeier, L; Nishiura, H; Nomachi, M; Nones, C.; Ogawa, H; Ogawa, I; Ohsumi, H; Palladino, V; Paniccia, M; Perotto, L; Petcov, S; Pfister, S; Piquemal, F; Poves, A; Praet, Ch; Raffelt, G; Ramberg, E; Rashba, T; Regnault, N; Ricol, J St; Rodejohann, W; Rodin, V; Ruz, J; Sander, Ch; Sarazin, X; Scholberg, K; Sigl, G; Simkovic, F; Sousa, A; Stanev, T; Strolger, L; Suekane, F; Thomas, J; Titov, N; Toivanen, J; Torrente-Lujan, E; Tytler, D; Vala, L; Vignaud, D; Vitiello, G; Vogel, P; Volkov, G; Volpe, C; Wong, H; Yilmazer, A

    2006-07-01

    This second symposium on neutrinos and dark matter is aimed at discussing research frontiers and perspectives on currently developing subjects. It has been organized around 6 topics: 1) double beta decays, theory and experiments (particularly: GERDA, MOON, SuperNEMO, CUORE, CANDLES, EXO, and DCBA), 2) neutrinos and nuclear physics, 3) single beta decays and nu-responses, 4) neutrino astrophysics, 5) solar neutrino review, and 6) neutrino oscillations. This document is made up of the slides of the presentations.

  13. NDM06: 2. symposium on neutrinos and dark matter in nuclear physics

    International Nuclear Information System (INIS)

    Akerib, D.; Arnold, R.; Balantekin, A.; Barabash, A.; Barnabe, H.; Baroni, S.; Baussan, E.; Bellini, F.; Bobisut, F.; Bongrand, M.; Brofferio, Ch.; Capolupo, A.; Carrara Enrico; Caurier, E.; Cermak, P.; Chardin, G.; Civitarese, O.; Couchot, F.; Kerret, H. de; Heros, C. de los; Detwiler, J.; Dracos, M.; Drexlin, G.; Efremenko, Y.; Ejiri, H.; Falchini, E.; Fatemi-Ghomi, N.; Finger, M.Ch.; Finger Miroslav, Ch.; Fiorillo, G.; Fiorini, E.; Fracasso, S.; Frekers, D.; Fushimi, K.I.; Gascon, J.; Genest, M.H.; Georgadze, A.; Giuliani, A.; Goeger-Neff, M.; Gomez-Cadenas, J.J.; Greenfield, M.; H de Jesus, J.; Hallin, A.; Hannestad, St.; Hirai, Sh.; Hoessl, J.; Ianni, A.; Ieva, M.B.; Ishihara, N.; Jullian, S.; Kaim, S.; Kajino, T.; Kayser, B.; Kochetov, O.; Kopylov, A.; Kortelainen, M.; Kroeninger, K.; Lachenmaier, T.; Lalanne, D.; Lanfranchi, J.C.; Lazauskas, R.; Lemrani, A.R.; Li, J.; Mansoulie, B.; Marquet, Ch.; Martinez, J.; Mirizzi, A.; Morfin Jorge, G.; Motz, H.; Murphy, A.; Navas, S.; Niedermeier, L.; Nishiura, H.; Nomachi, M.; Nones, C.; Ogawa, H.; Ogawa, I.; Ohsumi, H.; Palladino, V.; Paniccia, M.; Perotto, L.; Petcov, S.; Pfister, S.; Piquemal, F.; Poves, A.; Praet, Ch.; Raffelt, G.; Ramberg, E.; Rashba, T.; Regnault, N.; Ricol, J.St.; Rodejohann, W.; Rodin, V.; Ruz, J.; Sander, Ch.; Sarazin, X.; Scholberg, K.; Sigl, G.; Simkovic, F.; Sousa, A.; Stanev, T.; Strolger, L.; Suekane, F.; Thomas, J.; Titov, N.; Toivanen, J.; Torrente-Lujan, E.; Tytler, D.; Vala, L.; Vignaud, D.; Vitiello, G.; Vogel, P.; Volkov, G.; Volpe, C.; Wong, H.; Yilmazer, A.

    2006-01-01

    This second symposium on neutrinos and dark matter is aimed at discussing research frontiers and perspectives on currently developing subjects. It has been organized around 6 topics: 1) double beta decays, theory and experiments (particularly: GERDA, MOON, SuperNEMO, CUORE, CANDLES, EXO, and DCBA), 2) neutrinos and nuclear physics, 3) single beta decays and nu-responses, 4) neutrino astrophysics, 5) solar neutrino review, and 6) neutrino oscillations. This document is made up of the slides of the presentations

  14. Project safety studies - nuclear waste management (PSE)

    International Nuclear Information System (INIS)

    1981-10-01

    The project 'Safety Studies-Nuclear Waste Management' (PSE) is a research project performed by order of the Federal Minister for Research and Technology, the general purpose of which is to deepen and ensure the understanding of the safety aspects of the nuclear waste management and to prepare a risk analysis which will have to be established in the future. Owing to this the project is part of a series of projects which serve the further development of the concept of nuclear waste management and its safety, and which are set up in such a way as to accompany the realization of that concept. This report contains the results of the first stage of the project from 1978 to mid-1981. (orig./RW) [de

  15. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  16. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    Science.gov (United States)

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  17. Spent nuclear fuel project design basis capacity study

    International Nuclear Information System (INIS)

    Cleveland, K.J.

    1998-01-01

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. A base case, reflecting the Fiscal Year 1998 process configuration, is evaluated. Parametric evaluations are also considered, investigating the impact of higher fuel retrieval system productivity and reduced shift operations at the canister storage building on total project duration

  18. CDIO Projects in Civil Engineering Study Program at DTU

    DEFF Research Database (Denmark)

    Krogsbøll, Anette; Simonsen, Claus; Christensen, Jørgen Erik

    2011-01-01

    or a design build project on each of the first four semesters. In this paper the four projects in the civil engineering study program are described along with a brief description of the entire study program. The aim is to provide additional information and documentation to accompany an exposition where......In 2008 all Bachelor of engineering study programs at the Technical University of Denmark (DTU) have been adopted to the “Conceive – Design – Implement – Operate” approach. As part of the necessary changes it was decided that all seven study programs should have a cross disciplinary project...... students present their projects. Learning outcomes, training and assessment of personal, professional and social engineering skills are described from a project point of view. Progression of engineering skills is discussed from a study program perspective. The interrelation between the various elements...

  19. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  20. Aurora Mine project - historical resources baseline study

    International Nuclear Information System (INIS)

    Reeves, B.

    1996-01-01

    This volume contains the results of a base line archaeological study of the Aurora Mine Project local study area. It was compiled in support of Syncrude Canada's application to the Alberta Energy and Utilities Board (AEUB) and Alberta Environmental Protection to construct and operate it new Aurora Mine, located northeast of Fort McMurray, Alberta. The objective of this study was to compile, consolidate, review and analyze the reports for the area compiled over the past 22 years in and adjacent to the local study area (LSA), particularly those of now existing and Syncrude projects, and previously proposed Alsands and OSLO projects. The report is a summary of the human history in the area including pre-contact native archaeological sites, past archaeological studies, the Hinterland site pattern, post-contact native traditional sites, oil sands exploration/development related sites and paleontological sites in the subject area, and areas adjacent to it. 150 refs., 5 tabs., 43 figs

  1. A study of critical paths for feasibility studies of mining projects

    International Nuclear Information System (INIS)

    Sayadi, R.

    2002-01-01

    This work develops a model for design and realisation of profitability's and feasibility studies of a mining project. The model provides the structure of various necessary procedures to establish the feasibility studies and presents a logical system of task sequencing and information circulating between tasks. The specifications of mining projects, particularly their duration, complexity and high costs, necessitate design and realisation of feasibility study bases on the sufficient understanding of task behaviour and the critical path method view. For this purpose, critical paths with the highest frequency of occurrence were studied through several simulations. In addition, the critical tasks and sub tasks with the most probability were identified. The model introduced in this paper can serve as a perfect tool in feasibility study of a mining project. It can also be used as a basis of future development of mining software

  2. The Dynamics of Project-Based Learning Extension Courses: The "Laboratory of Social Projects" Case Study

    Science.gov (United States)

    Arantes do Amaral, Joao Alberto

    2017-01-01

    In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, "Laboratory of Social Projects." The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of…

  3. Esmeralda project for studying extensive sodium fire

    International Nuclear Information System (INIS)

    Sophy, Y.M.; Roy, D.; Bentz, A.; Gerosa, A.; Noel, H.

    1979-01-01

    This paper describes the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The motivations which prompted the decision to create this research facility are related to construction of the Super-Phenix breeder reactor and to the scale effect problems posed by the use of very large quantities of sodium. Information is included on the dimensions of the installation, the objectives of the project, the means to be employed, the timetable to be followed, and the organization which was created for this project within the context of Franco-Italian cooperation

  4. Canadian Pharmacy Practice Residents’ Projects: Publication Rates and Study Characteristics

    Science.gov (United States)

    Hung, Michelle; Duffett, Mark

    2013-01-01

    Background: Research projects are a key component of pharmacy residents’ education. Projects represent both a large investment of effort for each resident (up to 10 weeks over the residency year) and a large body of research (given that there are currently over 150 residency positions in Canada annually). Publication of results is a vital part of the dissemination of information gleaned from these projects. Objectives: To determine the publication rate for research projects performed under the auspices of accredited English-language hospital pharmacy residency programs in Canada and to describe the study characteristics of residency projects performed in Ontario from 1999/2000 to 2008/2009. Methods: Lists of residents and project titles for the period of interest were obtained from residency coordinators. PubMed, CINAHL, the Canadian Journal of Hospital Pharmacy, and Google were searched for evidence of publication of each project identified, as an abstract or presentation at a meeting, a letter to the editor, or a full-text manuscript. The library holdings of the University of Toronto were reviewed to determine study characteristics of the Ontario residency projects. Results: For the objective of this study relating to publication rate, 518 projects were included. The overall publication rate was 32.2% (60 [35.9%] as abstracts and 107 [64.1%] as full-text manuscripts). Publication in pharmacy-specific journals (66 [61.7%] of 107 full-text manuscripts) was more frequent than publication in non-pharmacy-specific journals. The publication rate of projects as full-text manuscripts remained stable over time. Of the 202 Ontario residency projects archived in the University of Toronto’s library, most were cohort studies (83 [41.1%]), and the most common topic was efficacy and/or safety of a medication (46 [22.8%]). Conclusions: Most hospital pharmacy residents’ projects were unpublished, and the publication rate of projects as full-text manuscripts has not

  5. Canadian pharmacy practice residents' projects: publication rates and study characteristics.

    Science.gov (United States)

    Hung, Michelle; Duffett, Mark

    2013-03-01

    Research projects are a key component of pharmacy residents' education. Projects represent both a large investment of effort for each resident (up to 10 weeks over the residency year) and a large body of research (given that there are currently over 150 residency positions in Canada annually). Publication of results is a vital part of the dissemination of information gleaned from these projects. To determine the publication rate for research projects performed under the auspices of accredited English-language hospital pharmacy residency programs in Canada and to describe the study characteristics of residency projects performed in Ontario from 1999/2000 to 2008/2009. Lists of residents and project titles for the period of interest were obtained from residency coordinators. PubMed, CINAHL, the Canadian Journal of Hospital Pharmacy, and Google were searched for evidence of publication of each project identified, as an abstract or presentation at a meeting, a letter to the editor, or a full-text manuscript. The library holdings of the University of Toronto were reviewed to determine study characteristics of the Ontario residency projects. For the objective of this study relating to publication rate, 518 projects were included. The overall publication rate was 32.2% (60 [35.9%] as abstracts and 107 [64.1%] as full-text manuscripts). Publication in pharmacy-specific journals (66 [61.7%] of 107 full-text manuscripts) was more frequent than publication in non-pharmacy-specific journals. The publication rate of projects as full-text manuscripts remained stable over time. Of the 202 Ontario residency projects archived in the University of Toronto's library, most were cohort studies (83 [41.1%]), and the most common topic was efficacy and/or safety of a medication (46 [22.8%]). Most hospital pharmacy residents' projects were unpublished, and the publication rate of projects as full-text manuscripts has not increased over time. Most projects were observational studies

  6. Pad A treatability study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-06-01

    This plan addresses the work to be accomplished by the Pad A Treatability Study Project. The purpose of this project is to investigate potential treatment and separation technologies, identify the best technologies, and to demonstrate by both lab- and pilot-scale demonstration, the most applicable remedial technologies for treating plutonium-contaminated salts at the Pad A site located at the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) a the Idaho National Engineering Laboratory (INEL). The conduct of this project will be supported by other DOE laboratories, universities, and private industries, who will provide support for near-term demonstrations of treatment and separation technologies. The purpose of this long-range planning document is to present the detailed plan for the implementation of the Pad A Treatability Study Project

  7. Feasibility Study for a Hopi Utility-Scale Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Kendrick Lomayestewa

    2011-05-31

    The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. Wind resource assessments were conducted at two study sites on Hopi fee simple lands located south of the city of Winslow. Reports from the study were recently completed and have not been compared to any existing historical wind data nor have they been processed under any wind assessment models to determine the output performance and the project economics of turbines at the wind study sites. Ongoing analysis of the wind data and project modeling will determine the feasibility of a tribal utility-scale wind energy generation.

  8. A Place for Project Management in English Studies and Communication studies  curricula

    DEFF Research Database (Denmark)

    Kampf, Constance; Isohella, Suvi

    2009-01-01

    In this paper, we argue for a place for project management in the English Studies and Communication Studies curricula, often the home of Technical Communication programs, in order to offer students an opportunity to apply their language, discourse analysis, analytical skills, and creativity in a ...... of the project management genres are briefly discussed and related to key skills emerging from English studies and Technical Communication curricula.......In this paper, we argue for a place for project management in the English Studies and Communication Studies curricula, often the home of Technical Communication programs, in order to offer students an opportunity to apply their language, discourse analysis, analytical skills, and creativity...

  9. Study on Top-Down Estimation Method of Software Project Planning

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jun-guang; L(U) Ting-jie; ZHAO Yu-mei

    2006-01-01

    This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, Program Evaluation and Review Technique (PERT) method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning.

  10. Evaluating effectiveness of project start-ups: an exploratory study

    NARCIS (Netherlands)

    Halman, Johannes I.M.; Burger, G.T.N.

    In this paper an exploratory study is reported about the effectiveness of project start-up (PSU) practices within a world-scale operating, high technology innovating and manufacturing company. The emphasis is on the focal position of both project owner and project manager. To uncover potential

  11. Ecological impact study methodology for hydrotechnical projects

    International Nuclear Information System (INIS)

    Manoliu, Mihai; Toculescu, Razvan

    1993-01-01

    Besides the expected benefits, hydrotechnical projects may entail unfavorable effects on the hydrological regime, environment, health and living conditions of the population. Rational water resource management should take into consideration both the favorable and unfavorable effects. This implies the assessment of socio-economic and environmental impacts of the changes of the hydrological regime. The paper proposes a methodology for carrying out impact studies of hydrotechnical projects. The results of the work are presented graphically on the basis of composite programing. A summary of mathematical methods involved in impact study design is also presented. (authors)

  12. A project management approach to an ACPE accreditation self-study.

    Science.gov (United States)

    Dominelli, Angela; Iwanowicz, Susan L; Bailie, George R; Clarke, David W; McGraw, Patrick S

    2007-04-15

    In preparation for an on-site evaluation and accreditation by the American Council on Pharmaceutical Education (ACPE), the Albany College of Pharmacy employed project management techniques to complete a comprehensive self-study. A project lifecycle approach, including planning, production, and turnover phases, was used by the project's Self-Study Steering Committee. This approach, with minimal disruption to college operations, resulted in the completion of the self-study process on schedule. Throughout the project, the Steering Committee maintained a log of functions that either were executed successfully or in hindsight, could have been improved. To assess the effectiveness of the project management approach to the the self-study process, feedback was obtained from the College community through a poststudy survey. This feedback, coupled with the Steering Committee's data on possible improvements, form the basis for the lessons learned during this self-study process.

  13. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Science.gov (United States)

    Romeli, Norsyakilah; Muhamad Halil, Faridah; Ismail, Faridah; Sufian Hasim, Muhammad

    2018-03-01

    As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  14. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Directory of Open Access Journals (Sweden)

    Romeli Norsyakilah

    2018-01-01

    Full Text Available As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  15. Pre-feasibility study template for nZEB pilot projects development

    OpenAIRE

    Crespo Sánchez, Eva

    2015-01-01

    This document corresponds to Task 5.2 NZEB pilot projects development, Deliverable 5.2 Basic project conceptual design with feasibility analysis for eight pilot project of the SUSTAINCO project and should present a structure of pre-feasibility studies for eight NZEB projects implementation. It aims to give an overview of how SUSTAINCO project implementation is to be prepared and which technical and financial parameters to concern.

  16. The Use of Volunteers in Local Study Library Projects: A Case Study of the Walter Gardiner Photography Project

    Directory of Open Access Journals (Sweden)

    Beth Hewitt

    2012-03-01

    Full Text Available Objectives – Interviews with library staff and volunteers were conducted to evaluate the use of volunteers in UK public libraries via a case study of the Walter Gardiner Photographic Project, a digitisation project based in Worthing Library, to inform future guidelines on volunteer usage and to make recommendations to existing practice.Methods – Fourteen semi-structured interviews were carried out to explore the perceptions and experiences of both staff and volunteers of the project. All interviews were fully transcribed and then coded to identify emergent themes.Results – Key positives for volunteers were professional training, good time management and organization by staff, the friendliness and approachability of staff, and the informal nature of the volunteering. Enjoyment of the work and forming close relationships with others were key motivating factors. For staff, the completion of work which would have otherwise been impossible was the most positive outcome. Problem areas identified by volunteers were lack of contact time with project staff and feeling isolated from other library staff. For project staff, a lack of professionalism on behalf of some volunteers was the primary negative. Key issues to emerge were the need to strike a balance between formal and informal management, the need for good integration between the volunteers and host organization, and the importance of acknowledging the nature of the voluntary commitment.Conclusions – The project proved overall to be a successful example of using volunteers in public library projects with good examples of volunteer recruitment, training, and management being demonstrated. Areas of conflict that did arise stemmed from differing expectations of levels of service between staff and volunteers. Clarification on these expectations through a written volunteer agreement is advocated for further projects.

  17. Socioeconomic study: WPPSS Nuclear Projects 1 and 4

    International Nuclear Information System (INIS)

    1975-04-01

    A study is presented which is primarily concerned with the identification of those WNP-1 and WNP-4 impacts which place stress upon the socioeconomic structure of the Tri-City region. The study fulfills three objectives: first, to describe the socioeconomic implications of the proposed projects and the components of socioeconomic structure characterizing the study region; second, to postulate the potential impacts of the projects as well as possible mitigating measures on these components; and third, to present overall evaluation and planning strategies

  18. Technology Uncertainty and Project Managers' Information Sharing - A comparative case study of two new product development projects

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Dietrich, Perttu

    2014-01-01

    uncertainty during various phases of new product development (NPD) projects. In this study, we compare two longitudinal NPD sub-projects that differ in uncertainty within the same large NPD project, in which the data source is the complete email exchange between a project manager and various actors...... (consisting of 3979 emails). The results show high levels of information sharing with the customer in both the early and late phases of high uncertainty. Interestingly, in the low uncertainty project, information sharing with the production department and the supplier is higher during the late phase...... of the NPD project. Unexpectedly, in both sub-projects, the project manager shares information with a wider range of both intra- and inter-organization actors in the early phases of the projects than in the late phases....

  19. ICT and the Project Studies at Roskilde University, Denmark

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche; Ou, Tie

    2004-01-01

    needs for qualification and reform. With distinctive philosophy and approach in education, studies at Roskilde University are organized as project work characterized by problem orientation, participant direction, exemplarity, interdisciplinarity and collaborative learning. The paper addresses how...... the increasing application of ICT is changing the educational environments at Roskilde University and, consequently, facilitating and challenging the project studies. The discussion is mainly based on an empirical research in which we observed a group of students and participated in their project work. The data...

  20. Pad A Treatability Study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-08-01

    The purpose of the Pad A Treatability Study Project is to identify and demonstrate through lab- and pilot-scale testing, technologies for treating plutonium-contaminated salt waste. This document presents proposed objectives and schedules, scope of work and breakdown structure, cost elements, deployment, benefits, and change controls for the project

  1. The ESMERALDA project for studying extensive sodium fire

    International Nuclear Information System (INIS)

    Sophy, Y.M.; Roy, D.; Noel, H.; Gerosa, A.

    1979-08-01

    This paper describes the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The motivations which prompted the decision to create this research facility are related to construction of the Super-Phenix breeder reactor and to the scale effect problems posed by the use of very large quantities of sodium. Information is included on the dimensions of the installation, the objectives of the project, the means to be employed, the timetable to be followed, and the organization which was created for this project within the context of Franco-Italian cooperation

  2. The Woodworker's Website: A Project Management Case Study

    Science.gov (United States)

    Jance, Marsha

    2014-01-01

    A case study that focuses on building a website for a woodworking business is discussed. Project management and linear programming techniques can be used to determine the time required to complete the website project discussed in the case. This case can be assigned to students in an undergraduate or graduate decision modeling or management science…

  3. Halifax Lateral Pipeline Project : comprehensive study report

    International Nuclear Information System (INIS)

    1998-12-01

    The National Energy Board has requested the preparation of a comprehensive study report (CSR) for the proposed Halifax Lateral Pipeline Project in support of Maritimes and Northeast Pipeline Company's proposal to construct the lateral pipeline to transport natural gas produced in offshore Nova Scotia to the Tufts Cove electric generating station in the Halifax Regional Municipality. The project will also enhance the access of natural gas to potential markets located along the pipeline route. This CSR was prepared according to guidelines of the Canadian Environmental Assessment Agency. The report presents: (1) an overview of the project, (2) a summary of the regulatory requirements for assessment, (3) a description of the environmental assessment and regulatory process to date, (4) a summary of the predicted residual environmental and socio-economic effects associated with the project, and (5) a summary of the public consultation process. The environmental and socio-economic assessment focused on these eleven issues: groundwater resources, surface water resources, wetlands, soils, air quality, fish habitat, rare herpetiles, mammals, avifauna, rare plants and archaeological heritage resources. The report identified potential interactions between the project and valued socio-economic and environmental components. These were addressed in combination with recommended mitigative measures to reduce potential adverse effects. It was concluded that the overall environmental effects from the proposed project are likely to be minimal and can be effectively managed with good environmental management methods. 14 refs., 5 tabs., 5 figs., 2 appendices

  4. Users and user study methodology: the JUBILEE project

    Directory of Open Access Journals (Sweden)

    Linda Banwell

    2004-01-01

    Full Text Available This paper presents both theoretical aspects and practical examples from the on-going and large-scale JUBILEE (JISC User Behaviour in Information seeking: Longitudinal Evaluation of Electronic information services project, now in its fifth year. Particular emphasis will be placed on the importance of using robust theory and methods as the basis for reputable user studies, especially those undertaken by practitioners. Theory underlying the development of the JUBILEE project and Toolkit is outlined, followed by demonstration of its practical use and impact during the project's on-going program of monitoring and evaluation activities. Themes underlying the paper concern the importance to practitioners of the need to understand and adopt a well founded methodology and sound methods with which to conduct projects, the additional benefits they can derive by so doing, and the pitfalls and dangers of not so doing. JUBILEE is used throughout as the example project to demonstrate the points made.

  5. The Ranger project - a case study

    International Nuclear Information System (INIS)

    Young, R.I.

    1983-01-01

    Ranger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3000 tonne/yr of U 3 O 8 from 3500 tonne/day of mill feed. The construction of the project was completed in 1981. Wright-Davy were the project managers and designers of the $270 million ore treatment plant and associated infrastructure. Details of project cost, staffing, project design and project systems are given

  6. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  7. PUREX transition project case study

    International Nuclear Information System (INIS)

    Jasen, W.G.

    1996-01-01

    In December 1992, the US Department of Energy (DOE) directed that the Plutonium-Uranium Extraction (PUREX) Plant be shut down and deactivated because it was no longer needed to support the nation's production of weapons-grade plutonium. The PUREX/UO 2 Deactivation Project will establish a safe and environmentally secure configuration for the facility and preserve that configuration for 10 years. The 10-year span is used to predict future maintenance requirements and represents the estimated time needed to define, authorize, and initiate the follow-on decontamination and decommissioning activities. Accomplishing the deactivation project involves many activities. Removing major hazards, such as excess chemicals, spent fuel, and residual plutonium are major goals of the project. The scope of the PUREX Transition Project is described within

  8. Grounded Theory Study of Conflicts in Norwegian Agile Software Projects: The Project Managers’ Perspective

    Directory of Open Access Journals (Sweden)

    Lubna Siddique

    2016-07-01

    Full Text Available This paper aims to explore the process of conflicts in agile software projects. The purpose was to investigate the causes and consequences of these conflicts. For this purpose, we conducted a qualitative study involving agile software projects in Norway. Grounded theory was used to analyze the data and the interview findings are presented using Glaser´s Six C model (context, condition, causes, consequences, contingencies, and covariance. The research findings suggest that there are several causes of conflicts. These include: the role of the product owner, an inexperienced project manager, the customer’s lack of knowledge about methodology organizational hierarchy in public companies, contracting, personal egos, financial issues, not getting the right team. Consequences of conflicts include: decreased productivity, wastage of time and resources, diverted attention from project objectives loss of motivation, poor decision making, loss of communication. Based on interview data, different conflict strategies are suggested and these include appropriately skilled project manager, communication and negotiation, defining clear roles, stakeholder analysis, managing stakeholder´s expectations, discussion, finding the root cause of conflict. Project managers are using these strategies to avoid or resolve conflicts. The competencies required to handle these kind of conflicts are also discussed in the paper, while the implications of theory and practice of conflict management theory are also presented.

  9. Contractors' Perception of factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia

    Directory of Open Access Journals (Sweden)

    Azlan Shah Ali

    2010-12-01

    Full Text Available Delay in construction projects is a situation where the project cannot be completed under the planned time. It is a common issue faced in the construction industry all over the world especially in developing countries. In the Malaysian construction industry, 17.3% of construction projects experience more than 3 months delay and some of them are abandoned. Hence, the study of factors contributing to delay is very important in order to reduce the number of projects that experience delay in project delivery. Three objectives of the research have been formulated, namely (1 to identify factors that contribute to delay in construction projects; (2 to analyse and rank the causes of delay rated by contractors; and (3 to study the effects of delay in construction projects. One hundred questionnaires were distributed during data collection stage and only 36 responses received. The respondents only consist of contractors and sub-contractors because the scope of the research focuses on contractors' perception. The data collected was analysed using SPSS software. Seven factors that contribute to delay were identified through literature review, namely contractors' financial difficulties, construction mistakes and defective work, labour shortage, coordination problems, shortage of tools and equipment, material shortage and poor site management. Of those factors, the three most important factors were found to be labour shortage, contractors' financial difficulties and construction mistakes and defective works. Besides project delay, the research shows that cost overrun and extension of time (EOT are the most common effects of delay in construction projects.

  10. Analysis of the data from the NEMO3 experiment and search for neutrinoless double beta decay - Study of systematic bias of the calorimeter and development of analysis tools

    International Nuclear Information System (INIS)

    Hugon, C.

    2012-11-01

    The NEMO3 experiment was researching the neutrinoless double-β (0ndb) decay by using various sources of double beta decay isotopes (mainly 100 Mo, 82 Se, 116 Cd and 130 Te for about 10 kg in total). The detector was located in the underground laboratory of Modane (Italy) in the halfway point of the Frejus tunnel. This experiment demonstrated that the 'tracko-calo' technology is really competitive and, in addition, it gives new results for the 2-neutrinos double-β (2ndb) decay and the (0ndb) decays research. Moreover it opened an new way for its successor SuperNEMO, which aim is to reach a mass of 100 kg of 82 Se (for a sensitivity of 10 26 years). The main goal of the thesis is to measure the 2ndb and 0ndb decay of the 100 Mo to the excited state 0 1 + of the 100 Ru thanks to the whole NEMO3 data, with new original methods of analysis and through the development of the collaboration analysis software. The results obtained for the ground states (gs) and excited states 2ndb of the 100 Mo are for the half-lives: T(2nbd, gs)=[7.05±0.01(stat)±0.54(syst)]*10 18 years and T(2ndb, 0 1 + )=[6.15±1.1(sta)±0.78]*10 20 years. Those results are compatibles with the last ones published by the collaboration. For the 0ndb(0 1 + ), this work gave a half-life of T(0ndb, 0 1 + ) > 2.6*10 23 years, improving significantly the last published results. Furthermore those methods also allowed to present a new and more exhaustive background noise model for this experiment. The second point of this work was to measure the systematics errors of the NEMO3 calorimeter, among others due to the wavelength of the NEMO3 calibration systems. This work was done using a new test bench based on LED. This bench also allowed to contribute to the development of the SuperNEMO calorimeter, especially in the time characteristic and the energy linearity measurement of the photomultiplier intended to the demonstrator of the experiments. (author)

  11. Accessing Digital Libraries: A Study of ARL Members' Digital Projects

    Science.gov (United States)

    Kahl, Chad M.; Williams, Sarah C.

    2006-01-01

    To ensure efficient access to and integrated searching capabilities for their institution's new digital library projects, the authors studied Web sites of the Association of Research Libraries' (ARL) 111 academic, English-language libraries. Data were gathered on 1117 digital projects, noting library Web site and project access, metadata, and…

  12. South Bay Salt Pond Mercury Studies Project

    Science.gov (United States)

    Information about the SFBWQP South Bay Salt Pond Mercury Studies Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  13. Flash Study Analysis and the Music Learning Pro-Files Project

    Science.gov (United States)

    Cremata, Radio; Pignato, Joseph; Powell, Bryan; Smith, Gareth Dylan

    2016-01-01

    This paper introduces the Music Learning Profiles Project, and its methodological approach, flash study analysis. Flash study analysis is a method that draws heavily on extant qualitative approaches to education research, to develop broad understandings of music learning in diverse contexts. The Music Learning Profiles Project (MLPP) is an…

  14. The Project TALENT Twin and Sibling Study.

    Science.gov (United States)

    Prescott, Carol A; Achorn, Deanna Lyter; Kaiser, Ashley; Mitchell, Lindsey; McArdle, John J; Lapham, Susan J

    2013-02-01

    Project TALENT is a US national longitudinal study of about 377,000 individuals born in 1942-1946, first assessed in 1960. Students in about 1,200 schools participated in a 2-day battery covering aptitudes, abilities, interests, and individual and family characteristics (Flanagan, 1962; www.projectTALENT.org). Follow-up assessments 1, 5, and 11 years later assessed educational and occupational outcomes. The sample includes approximately 92,000 siblings from 40,000 families, including 2,500 twin pairs and 1,200 other siblings of twins. Until recently, almost no behavior genetic research has been conducted with the sample. In the original data collection information was not collected with the intent to link family members. Recently, we developed algorithms using names, addresses, birthdates, and information about family structure to link siblings and identify twins. We are testing several methods to determine zygosity, including use of yearbook photographs. In this paper, we summarize the design and measures in Project TALENT, describe the Twin and Sibling sample, and present our twin-sib-classmate model. In most twin and family designs, the 'shared environment' includes factors specific to the family combined with between-family differences associated with macro-level variables such as socioeconomic status. The school-based sampling design used in Project TALENT provides a unique opportunity to partition the shared environment into variation shared by siblings, specific to twins, and associated with school- and community-level factors. The availability of many measured characteristics on the family, schools, and neighborhoods enhances the ability to study the impact of specific factors on behavioral variation.

  15. Managing IT Projects in Public Companies: A Case Study

    Directory of Open Access Journals (Sweden)

    Bouras, A.

    2014-07-01

    Full Text Available As part of its public sector modernization effort, a North African government has put a lot of effort and allocated significant budgets since 1997 to modernize one of its main public sector companies. Consequently, this company, that mainly offers postal services, initiated many IT-based projects to computerize all paper-based ongoing services offered through its branches and to present new products to customers. This company was aiming to improve service quality and to diversify the range of its services. However, some of these IT-based projects inevitably faced problems. Some projects were either not completed successfully, cancelled, over-budget or taking more time than scheduled. As a result, many employees and customers of this company were dissatisfied and complained about bad planning, slowness and significant disruptions in these projects, an event that affected adversely the quality of service. This study aims at determining the causes of these project disruptions, failures or delays. To achieve this aim, 30 experienced project developers and engineers working in that company’s IT department volunteered to respond to a detailed questionnaire specifically developed for this purpose. The questionnaire included questions about project vision clarity, time/cost management, project quality assurance, risk management and human resources management. Results show that the main reasons for disruptions, failure or delays in IT projects are lack of business plan and poor documentation during and after finishing projects, lack of clear quality assurance criteria, standards and reviews, and poor project risk management practices. Ramifications of such results in terms of improving IT project management practices in the public service sector are finally presented.

  16. Wholesomeness studies in the International Food Irradiation Project

    Energy Technology Data Exchange (ETDEWEB)

    Elias, P S [International Food Irradiation Project, Federal Research Centre for Nutrition

    1980-01-01

    Despite more than 25 years of history as an effective food preservation method, food irradiation is still subject to strict legislative control in many countries and scientific investigations are required to provide reassurance as to the safety of irradiated food. The International Food Irradiation Project was set up on October 14, 1970 to facilitate the objective evaluation of the wholesomeness of irradiated foodstuffs. Its major activities are; (1) wholesomeness testing of irradiated foods, (2) research on and investigations into the methodology of wholesomeness testing, (3) dissemination of information, and (4) assisting national and international authorities in their consideration of acceptance of irradiated food. In particular, the project over the past nine years had been devoted to the provision of data to national health authorities and international bodies. Up to now, 23 studies were and are being carried out for the project under contract. Subjects for the studies include wheat, wheat flour, potatoes, fish, rice, mango, spices, dried dates, onions and cocoa beans.

  17. Wholesomeness studies in the International Food Irradiation Project

    International Nuclear Information System (INIS)

    Elias, P.S.

    1980-01-01

    Despite more than 25 years history as an effective food preservation method, food irradiation is still subject to strict legislative control in many countries and it is required to carry out scientific investigations to reassure the safety of irradiated food. The International Food Irradiation Project was set up on October 14, 1970 to facilitate the objective evaluation of the wholesomeness of irradiated foodstuffs. Its major activities are; (1) wholesomeness testing of irradiated foods, (2) research on and investigations into the methodology of wholesomeness testing, (3) dissemination of information, and (4) assisting national and international authorities in their consideration of acceptance of irradiated food. In particular, the project over the past nine years had been devoted to the provision of data to national health authorities and international bodies. Up to now, 23 studies were and are being carried out for the project under contract. Subject to the studies include wheat, wheat flour, potatoes, fish, rice, mango, spices, dried dates, onions and cocoa beans. (Kitajima, A.)

  18. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    At the request of Enova (the 'Client'), Garrad Hassan and Partners Limited ('GH') has provided technical advice on capital cost expectations for wind farm developments. In summary, the work provides a survey of the present and future 5-year prognosis for costs and conditions facing developers and suppliers in the European wind power market. The report will be used as a benchmark to support tendering for future Norwegian projects. As such, it will also provide discussion of how project characteristics can influence project cost. Data Used in the Analysis GH has obtained data on the investment costs for 35 projects developed or in development in Europe. The projects represent to the extent possible the characteristics representative of potential Norwegian projects. The data used in this analysis are from actual projects in: France, Germany, Hungary, Ireland, Italy, Northern Ireland, Portugal, Scotland, Spain and Wales. The turbine capacities represented in the data are typically 2 MW or above, except in one case where a mix of turbines sizes was used at the project. GH highlights that because of high demand for turbines, the main manufacturers have recently been offering to meet delivery schedules for new orders from late 2010. For new tenders it is likely that delivery time frames offered will now be for 2011 deliveries. As a result of the current 'Seller's Market', production capacity typically relates directly to the number of turbines sold in the year; therefore for 2007 the annual production capacity was approximately 22 GW. GH is aware that turbine suppliers across the market are working to increase their production capacity in order to ease the pressure on the market, however, there are bottlenecks through the supply chain at the sub component level. As a result, increases in production capacity will likely remain at a relatively steady state in the short term. Energy Assessment The energy assessment of a project is the area

  19. Users and user study methodology: the JUBILEE project

    OpenAIRE

    Linda Banwell; Graham Coulson

    2004-01-01

    This paper presents both theoretical aspects and practical examples from the on-going and large-scale JUBILEE (JISC User Behaviour in Information seeking: Longitudinal Evaluation of Electronic information services) project, now in its fifth year. Particular emphasis will be placed on the importance of using robust theory and methods as the basis for reputable user studies, especially those undertaken by practitioners. Theory underlying the development of the JUBILEE project and Toolkit is out...

  20. Project-Based Learning in Electronic Technology: A Case Study

    Science.gov (United States)

    Li, Li

    2015-01-01

    A case study of project-based learning (PBL) implemented in Tianjin University of Technology and Education is presented. This multidiscipline project is innovated to meet the novel requirements of industry while keeping its traditional effectiveness in driving students to apply knowledge to practice and problem-solving. The implementation of PBL…

  1. Quantitative Correlational Study: Emotional Intelligence and Project Outcomes among Hispanics in Technology

    Science.gov (United States)

    Trejo, Arturo

    2013-01-01

    The present quantitative correlational research study explored relationships between Emotional Intelligence (EI) competencies, such as self-awareness, self-management, social awareness, and relationship management, and project management outcomes: scope creep, in-budget project cost, and project timeliness. The study was conducted within the…

  2. M3D project for simulation studies of plasmas

    International Nuclear Information System (INIS)

    Park, W.; Belova, E.V.; Fu, G.Y.; Sugiyama, L.E.

    1998-01-01

    The M3D (Multi-level 3D) project carries out simulation studies of plasmas of various regimes using multi-levels of physics, geometry, and mesh schemes in one code package. This paper and papers by Strauss, Sugiyama, and Belova in this workshop describe the project, and present examples of current applications. The currently available physics models of the M3D project are MHD, two-fluids, gyrokinetic hot particle/MHD hybrid, and gyrokinetic particle ion/two-fluid hybrid models. The code can be run with both structured and unstructured meshes

  3. PROJECT-DRIVEN SOFTWARE BUSINESS IN TRANSILVANIA - A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Radu Marius

    2015-07-01

    Full Text Available The fairly low salaries of the IT workers compared to the Western countries, the skills and the location have supported outsourcing become one of the most competitive Romanian sectors. IT sector in Romania maintains a steady growth favoured by outsourcing companies. Moreover Romania is highly competitive when you take into account the level of technical proficiency and soft skills in the country. Romanian labour force can drive relevant projects even in small teams. This case study explores the realty of Romanian IT companies profiles. It presents in comparison two companies bases on organizational and strategic dimensions: project approach orientation, leadership, project value driven, and social responsibility. The corporate goal of the first company presented in the case study - Fortech - is to achieve the best adaptive organizational structure which can sustain its competitive advantage. This advantage results from combination of three main ingredients: scaled up human resource capital, versatile knowledge management and adaptability to customer needs. Fortech manages and administrates and execute their business activities using project management methodologies and practices in order to achieve the strategic goals. On the other hand Dolphin Kiss Company is a “Python boutique agency” created around a single contract and organized on a single project. The project was contracted with a top company from telecommunication industry. The company is a small team of creative software engineers focused on developing a very innovative software business solution. This case study is an empirical qualitative research intended to depict the main differences between two relevant company profiles present in the actual economic context: small team – results oriented – highly skilled VS large structure of outsourcing teams – matrix organized – customer oriented. The case study constructs a space for debates regarding the potential evolution of the

  4. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects

    International Nuclear Information System (INIS)

    Morimoto, Risako

    2013-01-01

    Before commissioning any energy projects, conducting robust assessments of different options in terms of their economic and socio-environmental impacts is important for successful project implementation. Yet, there is currently a lack of tools that simultaneously assess sustainability impacts; instead, they are often investigated separately, which gives decision makers somehow disintegrated information. Thus the main objective of this study is to examine how to incorporate socio-environmental considerations into project assessment models. The multi-criteria analysis is applied to the case study of Sri Lankan hydropower projects as an illustrative example. The estimated quantitative relationship between economic, environmental and social impacts of hydropower development is presented in this study. Such estimation, using sustainability indicators of hydropower projects, enables us to understand marginal trade-offs among economic, environmental and social objectives of hydropower development. Hence, this would provide an overview of potential impacts of different scenarios that are designed to be implemented and indicate an optimum mix of hydropower generation. - Highlights: • This study provides an effective hydropower project evaluation method using the MCA. • The proposed tool shows the quantitative relationship explicitly. • Marginal trade-offs between sustainability objectives are presented

  5. The Citizenship Safety Project: a pilot study.

    Science.gov (United States)

    Frederick, K; Barlow, J

    2006-02-01

    The Government White Paper Saving Lives: Our Healthier Nation (1999) provides a clear indication that accidents are a serious public health problem and have been targeted by the Department of Health as a key area for prevention over the next 10 years. School-based injury prevention programmes have been identified as one of the key settings for the implementation of the White Paper's heath promotion strategies. The Citizen Safety Project (CSP) is a peer-delivered injury prevention programme for Year 10 students (14-15 years) and Year 2 pupils (6-7 years). This paper summarizes the findings of a pilot study that assessed the feasibility of implementing the CSP in schools and of conducting a larger study. Working as part of their Personal Social Health Education lessons, 11 pairs (n = 22) of Year 10 students developed a project to take one accident prevention theme of their choice into a primary school to teach small groups of five or six Year 2 pupils (n = 55). A formative evaluation was conducted, based on interviews with Year 2 and Year 10 teachers (n = 2), and the diaries of Year 10 students. Knowledge of accident prevention and risk awareness was measured in Year 2 pupils using the Draw and Write technique, and impact on Year 10 students was measured using self-esteem and locus of control inventories. Using both statistical and thematic analysis the study concludes that the CSP is well accepted, improves knowledge in Year 2 pupils and boosts confidence in Year 10 students, while concurrently achieving key stage attainment targets. Implications of the study are discussed in terms of future research, as are recommendations with regard to modifications to the project.

  6. An empirical study on key factors for purchasing strategy on project based organizations: A case study of gas field development projects

    Directory of Open Access Journals (Sweden)

    Aboulfazl Kazazi

    2012-08-01

    Full Text Available One of the primary concerns in development of oil and gas resources is to find the critical success factors associated with different important projects. Purchasing and procurement plays a key role in these projects. There is no doubt that in history of similar studies, there are not much studies to determine key factors. The proposed study of this paper presents an empirical study to find these factors in one of the most important gas filed in Iran is now South Pars Gas Field. The study distributes a questionnaire consists of various questions associated with purchasing activities. We investigate the feedbacks gathered from decision makers using factor analysis. The results of our survey reveal that there are three categories of organizational strategy, the relative importance of strategy and risk according to factor analysis. Each factor consists of many other factors and the relative importance of all factors are investigated.

  7. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  8. Learning from case studies and monitoring of Dutch tunnel projects

    NARCIS (Netherlands)

    Korff, M.

    2017-01-01

    Individuals and project-based organisations in the construction industry can learn in a (more) systematic way from case studies and the monitoring of underground construction works. Underground construction projects such as tunnels and excavations suffer as much or more from failure costs

  9. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  10. Reducing construction waste: A study of urban infrastructure projects.

    Science.gov (United States)

    de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu

    2017-09-01

    The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. NCSS Peace Studies Project: An Interim Report.

    Science.gov (United States)

    Ferber, Michael

    This preliminary report of a National Council for the Social Studies (NCSS) project briefly assesses teaching materials related to peace and nuclear warfare. Covering elementary, secondary, and higher education, the materials discussed present a variety of activities, decision-making approaches, and analytical assessments of policies of many…

  12. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  13. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  14. Laboratory of Corpuscular Physics - LPC Caen. July 2007 - December 2009 activity report

    International Nuclear Information System (INIS)

    2010-01-01

    The ENSICAEN (National Graduate School of Engineering) is an internationally renowned, pluri-disciplinary scientific research centre. Six of its seven laboratories are associated with the French National Centre of Scientific Research (CNRS), one of them also benefiting from the French Atomic and Renewable Energies (CEA) supervision. The Corpuscular Physics Laboratory (LPC) covers the following Research themes: Medical and industrial applications; upstream of the nuclear waste processing cycle; nuclear systems dynamics and thermodynamics; fundamental interactions; research on neutrinos; nuclei at the limits of stability; theoretical and phenomenological physics. This document is the July 2007 - December 2009 Activity report of the LPC-Caen. It presents the following activities: 1 - Physics Research: Nuclear physics (Nuclear structure, Nuclear dynamics and thermodynamics, Theoretical physics and phenomenology); interdisciplinary research (Back-end of the fuel cycle, Medical and industrial applications); FUNDAMENTAL INTERACTIONS and Neutrino Nature (NEMO3 and SuperNEMO experiments, β-ν correlations, n-EDM experiment); 2 - Technical and administrative activities (Administration, technical design and mechanics, electronics and microelectronics, computers and information technology, instrumentation, library, projects support and quality, health and safety); 3 - knowledge dissemination (teaching, training, seminars, valorisation, publications, conferences and scientific meetings); 4 - General information (permanent staff, organigram, research fellows, glossary)

  15. CDIO Projects in DTU’s B.Eng. in IT Study Program

    DEFF Research Database (Denmark)

    Sparsø, Jens; Bolander, Thomas; Fischer, Paul

    2011-01-01

    Since the fall 2008 all B.Eng. study programs at the Technical University of Denmark have been based on the CDIO concept. The adoption of the CDIO standards and principles resulted in new or significantly revised study programs. As part of this effort design-build projects have been introduced...... on each of the first 4 semesters, and each semester-project spans several courses. The aim of this paper is to describe the four CDIO semester projects in the B.Eng. in IT study, and – along with similar papers describing the other six B.Eng. programs – to provide documentation to accompany an exposition...

  16. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope

  17. Radiological safety research for nuclear excavation projects - Interoceanic canal studies

    Energy Technology Data Exchange (ETDEWEB)

    Klement, Jr, A W [U.S. Atomic Energy Commission, Las Vegas, NV (United States)

    1969-07-01

    The general radiological problems encountered in nuclear cratering and nuclear excavation projects are discussed. Procedures for assessing radiological problems in such projects are outlined. Included in the discussions are source term, meteorology, fallout prediction and ecological factors. Continuing research requirements as well as pre- and post-excavation studies are important considerations. The procedures followed in the current interoceanic canal feasibility studies provide examples of radiological safety problems, current solutions and needed research. (author)

  18. Radiological safety research for nuclear excavation projects - Interoceanic canal studies

    International Nuclear Information System (INIS)

    Klement, A.W. Jr.

    1969-01-01

    The general radiological problems encountered in nuclear cratering and nuclear excavation projects are discussed. Procedures for assessing radiological problems in such projects are outlined. Included in the discussions are source term, meteorology, fallout prediction and ecological factors. Continuing research requirements as well as pre- and post-excavation studies are important considerations. The procedures followed in the current interoceanic canal feasibility studies provide examples of radiological safety problems, current solutions and needed research. (author)

  19. A study on strategies for effective participation in the IAEA/RCA projects

    International Nuclear Information System (INIS)

    Chung, Joon Keuk; Jun, Byung Jin; Lee, Man Ki; Jin, Joon Ha; Choi, Pyung Hoon; Kim, Myung Ro; Min, Do Young

    2002-07-01

    In an effort to achieve the objectives, the following provisions were made. First of all, how this project supported RCA events that were held in Korea during the project period was described. Also, participation in RCA major policy level meetings, RCA-30 Scientific Forum, RCA Regional Office Opening were briefly reviewed. Secondly, RCA's general features including history and objective of its establishment, basic policy, administrative structure, major meetings was also reviewed. Thirdly, Overview of RCA projects, project implementation mechanism, on-going and planned project, review of technology utilization so fat and success stories were described. Fourthly, the issues related to the effective RCA management such as lead countries, Regional Resources Units (RRUs), RCA future vision and outsourcing of technical cooperation projects were reviewed. Finally, proper strategies and recommendations for active implementation of RCA projects were presented. This study can be utilized as basic reference material in the efficient implementation of RCA programmes in the future and for the personnel involved in the RCA projects as the fundamental elements for implementing the RCA cooperation are presented. The effective implementation direction for RCA programmes and strategies for strengthening Korea's participation in RCA projects can be utilized as basic reference material for the effective planning and implementation of RCA projects. It is hoped that this study will be widely utilized for expanding Korea's participation in the RCA project and for establishing a future direction for RCA projects by the governments, industries, academic circles and research institutions

  20. Project Investment and Project Financing: A study on Business Case and Financing Models

    OpenAIRE

    Wang, Simiao

    2012-01-01

    Uncertainty is a very significant factor that must be taken into consideration in project front-end phase management. By taking into uncertainty, the planners can to a great extent make sure that the business case could be accurate between specific intervals, hence business case can be based on to make decision. In a highly uncertain environment; the project sponsors should prefer other means to finance the project rather than using debt. Risk management is extremely important in project fina...

  1. CDIO Projects in DTU’s Chemical and Biochemical B.Eng. Study Program

    DEFF Research Database (Denmark)

    Clement, Karsten; Harris, Pernille; Agersø, Yvonne

    2011-01-01

    The aim of this paper is to describe how the CDIO standards [1] have influenced the cross-disciplinary projects that are part of the study plan for the Chemical and Biochemical B.Eng. program. Four projects are described: The 1st semester design-build project on cleaning of waste water from a power...... plant, the 2nd semester laboratory project concerning antimicrobial resistant E. coli bacteria in retail meats, the 3rd semester project on unit operations in enzyme production, the 4th semester project on the fermentation and purification part of enzyme production....

  2. Laboratory of Corpuscular Physics - LPC Caen / Laboratoire de Physique Corpusculaire - LPC Caen. Report 2010-2011

    International Nuclear Information System (INIS)

    2012-01-01

    This report covers the period 2010-11 and describes the work of the LPC Caen in the areas of basic and applied research (including technology transfer) and the educational activities, including public outreach, undertaken by the staff and students. The laboratory's activities over the last two years have been characterised by the upgrading of existing equipment and projects and the launching of new ones to be conducted at major facilities in the coming years. These projects involve physics with radioactive beams (GANIL/SPIRAL1, SPIRAL2, ISAC-TRIUMF and RIBF-RIKEN), neutron beams (NFS-SPIRAL2) and ultra-cold neutrons (PSI), the analysis of data from NEMO-3, the SuperNEMO project, nuclear waste processing (GUINEVERE) and the treatment of cancer by hadron-therapy (ARCHADE). Existing and new projects in theory and phenomenology have also been pursued with success. Beyond supporting the projects listed above, the laboratory's technical staff have lead our continued participation in the construction of the SPIRAL2 facility, as well as developing new electronics and a digital data acquisition system, along with the development of detectors for dosimetry in partnership with private industry. All of these activities have been ably supported by the laboratory's administrative service. Content: 1 - Research: Nuclear physics (Nuclear structure, Nuclear dynamics and thermodynamics, Theoretical physics and phenomenology); Interdisciplinary research (Nuclear waste management, Medical and industrial applications); Fundamental interactions (Neutrinoless double beta decay, Towards a new measurement of the neutron Electric Dipole Moment, Precise correlation measurements in nuclear beta decay, LPC Magneto-Optical Trap); 2 - Administration and technical departments (Administrative and general services, Design office and mechanical workshop, Electronics and microelectronics, Computing services, Instrumentation, Documentation, Quality assurance and project support, Health and safety); 3

  3. Financial study of an integrated nuclear desalination system in Tunisia: the Tundesal Project

    International Nuclear Information System (INIS)

    Bouzguenda Benzarti, Neila; Albouy, Michel; Nisan, Simon

    2006-01-01

    This paper focuses on a case study of financing an integrated nuclear desalination system at la Skhira site in Tunisia. More specifically, it shows the financial characteristics of the study, known as the TUNDESAL project, the main financing mechanisms that can be used, and the principal actions required to attract the potential investors and lenders. The paper describes: - The specific financial considerations corresponding to the particular characteristics of nuclear desalination projects: high capital costs, high level of risks and uncertainties, relatively long construction lead times and social and environmental concerns; - The main risks involved in nuclear energy projects; - The profitability study of the TUNDESAL project with the application of the Discounted Cash Flow Analysis; - The main financing sources for the project; - The financing schemes that can be used for project implementation and comparison between these schemes in terms of benefits generated, after covering project costs and repayment of lenders and investors; - The main actions to be done for making the project financially attractive in order to gain the confidence of investors and international financial institutions (optimal allocation of project risks and uncertainties, a suitable and flexible energy and water tariffs policy). Analysis has shown that in particular conditions of Tunisia, the most attractive financial scheme could be the 'project financing + leasing'. (authors)

  4. A Collaborative Disability Studies-based Undergraduate Art Project at Two Universities

    Directory of Open Access Journals (Sweden)

    John Derby

    2015-05-01

    Full Text Available In this manuscript, we discuss research findings from a collaborative visual arts curricular unit on ableism, which we implemented in non-Disability Studies undergraduate courses at two universities during the 2012-2013 academic year. Our project builds on previous research in which we (Derby, 2015, in press; Karr & Weida, 2013 began adding Disability Studies arts pedagogy to our undergraduate coursework. For this project, we developed a shared unit, which we implemented in a general freshman seminar course, an introductory art teaching methods course, and an upper level art education course on applied technology. Utilizing a pedagogy of transformation, we engaged students with shared resources, including lectures, readings, and videos on Disability Studies and ableism; the project culminated with each student producing and exhibiting both an artwork and an artist's statement. After reviewing the literature and describing the project and research methods, we provide a nuanced discussion of the data, especially the artwork. The data indicate that our students, who were previously unexposed to ableism, conceptualized ableism at least on an elementary level, with many students demonstrating advanced conceptualization of ableism in one or more of three categories. Our findings suggest that integrating Disability Studies into non-Disability Studies curricula on a small scale can be useful, but that results are limited by the complexities of disability. The success of the project indicates that incorporating Disability Studies into standard curricula through a pedagogy of transformation can reach typical college students who are unfamiliar with Disability Studies concepts.

  5. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)

    OpenAIRE

    Hatem Khaleefah Al-Ageeli; Abdul Salam J. Ali Alzobaee

    2016-01-01

    The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A select...

  6. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Ageeli

    2016-03-01

    Full Text Available The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twelve critical success factors, the most important factors of it were ("contractor financial efficiency ", " security ,political , economic stability ", "the project manager competence" and " Integration and clarity of contract documents " , thirteen critical failure factors, the most important factors of it were ("corruption " , " external circumstances ", "Financial difficulties of owner", and ten success criteria , the most important criteria of it were ("within allocated budget" , " within time period" , "Quality" .

  7. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project

  8. Case study: I-95 Landfill gas recovery project Fairfax County, Virginia

    International Nuclear Information System (INIS)

    McGuigan, M.J.; Peterson, E.R.; Smithberger, J.M.; Owen, W.L.

    1993-01-01

    This paper presents a case study of the landfill gas (LFG) recovery project at the I-95 Landfill in Fairfax County, Virginia. The project originally was conceived more than 10 years ago and has overcome numerous obstacles enroute to its present success. The efforts of the landfill owner (Fairfax County) and the project developer (Michigan Cogeneration Systems, Inc.) to surmount these obstacles are presented

  9. Reef and Shore. Hawaii Nature Study Project.

    Science.gov (United States)

    Hawaii Univ., Honolulu. Curriculum Research and Development Group.

    This teaching guide is one of a series developed by the Curriculum Research and Development Group at the University of Hawaii. The program is laboratory and field oriented for elementary students. The focus of study for the project is the plant and animal life and the physical components of the Hawaiian environment, and their ecological…

  10. PROJECT MANAGEMENT INFORMATION SYSTEM: STUDY IN SMALL AND MEDIUM ENTERPRISES OF INDUSTRIAL AUTOMATION

    Directory of Open Access Journals (Sweden)

    Paulo Eduardo Mondin

    2016-12-01

    Full Text Available This article aims to analyze the structuring stage and use of information systems in project management in small and medium-sized companies in the business of providing services in industrial automation. Information systems applied to project management - SIGPs can contribute to decision-making on projects, assisting in the management of reliable information in real time, making it a natural choice for most companies looking to increase performance management of their projects. The research method used was multiple case study, in line with the explanatory nature of the study, when to investigate and perform analytical comparisons on how small and medium-sized enterprises of the studied branch structure and use the SIGPs, considering the contemporary character theme and the possibility of direct observation of the object of study, in addition to conducting interviews. The main results were identified the main gaps in project management in companies and research as the management characteristics of these SMEs have influence in how their projects are managed. It was observed that there is a predominance of features involving scope, time and resources on projects, whereas aspects related to costs, risks, quality, procurement and communications have unimpressive results in relation to structuring.

  11. Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study

    Directory of Open Access Journals (Sweden)

    Mohammadreza Yadollahi

    2014-01-01

    Full Text Available All construction professionals such as civil, mechanical, and electrical engineers, quantity surveyors, and architects have important roles in the construction process. Among these, architects are frequently appointed as a project manager (PM. The role of a PM will drive the success of the projects implementation. Therefore, the capability of an architect as a PM (ArPM is critical in reducing challenges encountered. Accordingly, the identification of these challenges is an important task in selecting an appropriate ArPM. The aim of this study is to identify the most critical challenges faced by an ArPM for construction projects. The data were collected through questionnaires and interviews with architects and professionals in the Malaysian construction industry. Because of the fuzziness and uncertainty of subjective responses, Fuzzy Set Ttheory is applied to identify critical challenges. A total of 65 questionnaires were distributed and 36 questionnaires were returned. The results revealed that the critical challenges faced by an ArPM are “poor planning,” “unfamiliar technology,” “unfamiliarity with green buildings and materials,” “inappropriate scheduling,” and “poor workmanship.” All critical challenges were then categorized into six main groups including technical, managerial, personal skills, contractual, psychological, and financial.

  12. Some new machine projects studied at LNS

    International Nuclear Information System (INIS)

    Tkatchenko, A.

    1983-01-01

    In front of the increasing interest for the synchrotron radiation uses, the electron storage rings have been gradually transformed in light sources. Yet, those machines had not been optimized for this use. So, in the last 10 years, numerous optimized machines have been defined and destinated to sole synchrotron light production up to the X domain. In the French domain, several projects have been elaborated, to satisfy the national needs in far UV and X radiation. - SUPER-ACO project (0,8 GeV) from Orsay. Its realisation is in progress. - SIREM project (1,2 GeV) from Grenoble CEN. - European ESRF project (5 GeV) optimized for X radiation, and for which a work group has been installed at CERN. - A X radiation national machine project (3 or 4 GeV) derived from the ESRF one. - At last, the Mars project, concerning a X radiation source storage ring aimed to a industrial use: the microlithographie [fr

  13. Large scale waste combustion projects. A study of financial structures and sensitivities

    International Nuclear Information System (INIS)

    Brandler, A.

    1993-01-01

    The principal objective of the study was to determine the key contractual and financial aspects of large scale energy-from-waste projects, and to provide the necessary background information on financing to appreciate the approach lenders take when they consider financing waste combustion projects. An integral part of the study has been the preparation of a detailed financial model, incorporating all major financing parameters, to assess the economic and financial viability of typical waste combustion projects. (author)

  14. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  15. Wuskwatim generation project : Canadian Environmental Assessment Act comprehensive study report

    International Nuclear Information System (INIS)

    2005-10-01

    This study report described the plan by Manitoba Hydro and the Nisichawayasihk Cree Nation (NCN) to construct a new 200- megawatt (MW) generating station at Taskinigup Falls on the Burntwood River, near the outlet of Wuskwatim Lake. This hydroelectric power project will allow Manitoba Hydro to meet its projected energy needs within the next two decades as identified in its 2002/03 Power Resource Plan. It will also allow Manitoba Hydro and NCN to obtain additional export revenues and profits by advancing the in-service date of the Project from 2020 to 2009. A formal environmental assessment is required under the Canadian Environmental Assessment Act (CEAA) because Fisheries and Oceans Canada (DFO) has determined that the Project would cause fish habitat losses requiring an authorization under the Fisheries Act. Many of the structures to be built in navigable waters would also require formal approval under the Navigable Waters Protection Act (NWPA), which has prompted this application of the CEAA. This environmental assessment report has been prepared by DFO in consultation with Transport Canada and other federal authorities concerned. It provides a summary of the Wuskwatim Generation Project and the environment in which it will be built and operated. In addition, the results of public consultations are discussed. It presents an assessment of the Project's influence on fish and fish habitat, birds, species at risk, human health (local air quality, quality of drinking water and consumption of fishery products), navigation, use of renewable resources, and current use of lands and resources for traditional purposes by Aboriginal persons (hunting, trapping, gathering, subsistence fishing and heritage sites). It was concluded that the proposed Project, as defined by the scope of the study, is not likely to cause significant adverse environmental effects. 45 refs., 5 tabs., 13 figs., 3 appendices

  16. Study on Risk Approaches in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Claudiu BRANDAS

    2012-01-01

    Full Text Available Risk approaches in project development led to the integration in the IT project management methodologies and software development of activities and processes of risk management. The diversity and the advanced level of the used technologies in IT projects with increasing com-plexity leads to an exponential diversification of risk factors.The purpose of this research is to identify the level of the risk approach in IT projects both at the IT project management and software development methodologies level and the level of the perception of IT project man-agers, IT managers and IT analysts in Romanian IT companies. Thus, we want to determine the correlation between the use of a project management or software development methodology and the overall level of risk perceived by the project managers using these methodologies.

  17. Enhancing STEM coursework at MSIs through the AMS Climate Studies Diversity Project

    Science.gov (United States)

    Abshire, W. E.; Mills, E. W.; Slough, S. W.; Brey, J. A.; Geer, I. W.; Nugnes, K. A.

    2017-12-01

    The AMS Education Program celebrates a successful completion to its AMS Climate Studies Diversity Project. The project was funded for 6 years (2011-2017) through the National Science Foundation (NSF). It introduced and enhanced geoscience and/or sustainability-focused course components at minority-serving institutions (MSIs) across the U.S., many of which are signatories to the President's Climate Leadership Commitments, administered by Second Nature, and/or members of the Louis Stokes Alliances for Minority Participation. The Project introduced AMS Climate Studies curriculum to approximately 130 faculty representing 113 MSIs. Each year a cohort of, on average, 25 faculty attended a course implementation workshop where they were immersed in the course materials, received presentations from high-level speakers, and trained as change agents for their local institutions. This workshop was held in the Washington, DC area in collaboration with Second Nature, NOAA, NASA Goddard Space Flight Center, Howard University, and other local climate educational and research institutions. Following, faculty introduced and enhanced geoscience curricula on their local campuses with AMS Climate Studies course materials, thereby bringing change from within. Faculty were then invited to the following AMS Annual Meeting to report on their AMS Climate Studies course implementation progress, reconnect with their colleagues, and learn new science presented at the meeting. A longitudinal survey was administered to all Climate Diversity Project faculty participants who attended the course implementation workshops. The survey goals were to assess the effectiveness of the Project in helping faculty implement/enhance their institutional climate science offering, share best practices in offering AMS Climate Studies, and analyze the usefulness of course materials. Results will be presented during this presentation. The AMS Climate Studies Diversity Project builds on highly successful, NSF

  18. Engaging Students in Learning: Findings from a Study of Project-Led Education

    Science.gov (United States)

    Fernandes, Sandra; Mesquita, Diana; Flores, Maria Assunção; Lima, Rui M.

    2014-01-01

    This paper reports on findings from a three-year study of project-based learning implemented in the first year of the Industrial Engineering and Management programme, at the University of Minho, Portugal. This particular model was inspired on project-led education (PLE), following Powell and Weenk's [2003. "Project-Led Engineering…

  19. Project Leadership Lived Experiences with Web-Based Social Networking: A Phenomenological Study

    Science.gov (United States)

    Scroggins, Charles W.

    2010-01-01

    This study explores the lived experiences of project leaders adopting and using Web-2.0 social networking collaboration applications for their project leadership activities. The experiences of 20 project leaders in a Fortune 500 aerospace and defense enterprise in the northeastern United States of America were explored using a qualitative…

  20. Study on the relationship between project management and organizational efficacy in nonprofit organizations

    Directory of Open Access Journals (Sweden)

    Kao I-Chan

    2018-01-01

    Full Text Available This study treats the members in nonprofit organizations (NPOs as subjects, and explores the origination, planning, control, and completion of project management in NPOs, as well as the general performance of organizational efficacy, such as environmental satisfaction, organizational atmosphere, operational performance, job engagement, and work quality. It also probes into the relationship and effect. By various research methods, such as literature review and questionnaire survey, this study attempts to determine if project management in NPOs can significantly enhance organizational efficacy. This study finds that different NPOs have significant differences in the general performance of project management and organizational efficacy. When the performance of project management in NPOs is more significant, organizational efficacy is higher. Project management in NPOs has a significant path relationship to organizational efficacy; therefore, reinforcement of vocational training in the project management of NPOs could improve performance, which would have significant effect on enhancing organizational efficacy.

  1. Color image quality in projection displays: a case study

    Science.gov (United States)

    Strand, Monica; Hardeberg, Jon Y.; Nussbaum, Peter

    2005-01-01

    Recently the use of projection displays has increased dramatically in different applications such as digital cinema, home theatre, and business and educational presentations. Even if the color image quality of these devices has improved significantly over the years, it is still a common situation for users of projection displays that the projected colors differ significantly from the intended ones. This study presented in this paper attempts to analyze the color image quality of a large set of projection display devices, particularly investigating the variations in color reproduction. As a case study, a set of 14 projectors (LCD and DLP technology) at Gjovik University College have been tested under four different conditions: dark and light room, with and without using an ICC-profile. To find out more about the importance of the illumination conditions in a room, and the degree of improvement when using an ICC-profile, the results from the measurements was processed and analyzed. Eye-One Beamer from GretagMacbeth was used to make the profiles. The color image quality was evaluated both visually and by color difference calculations. The results from the analysis indicated large visual and colorimetric differences between the projectors. Our DLP projectors have generally smaller color gamut than LCD projectors. The color gamuts of older projectors are significantly smaller than that of newer ones. The amount of ambient light reaching the screen is of great importance for the visual impression. If too much reflections and other ambient light reaches the screen, the projected image gets pale and has low contrast. When using a profile, the differences in colors between the projectors gets smaller and the colors appears more correct. For one device, the average ΔE*ab color difference when compared to a relative white reference was reduced from 22 to 11, for another from 13 to 6. Blue colors have the largest variations among the projection displays and makes them

  2. The CUORE/CUORICINO project: preliminary studies

    International Nuclear Information System (INIS)

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 420 kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.) The scale of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project are briefly discussed [ru

  3. The CUORE/CUORICINO project: Preliminary studies

    International Nuclear Information System (INIS)

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 42-kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.). The state of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project, is briefly discussed

  4. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  5. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Down-selection of one or more Maglev projects for... Procedures For Financial Assistance § 268.21 Down-selection of one or more Maglev projects for further study... completion of Phase III of the Maglev Deployment Program, FRA will down-select one or more projects to...

  6. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    Science.gov (United States)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  7. Study On The Multi-Project Management Practices for Complex Investments

    Directory of Open Access Journals (Sweden)

    Mircea Sandru

    2015-11-01

    Full Text Available This paper highlights the results of a study carried out during the doctoral research in case of multi project Engineering, Procurement, Construction, Commissioning (EPCC investment types. The objective of this study was to improve the project portfolio management. The methodology used in the research presented in this paper is focused on the analysis of the authors related to the approaches debated in literature and theirs applicability in EPCC type investment programs. In this sense were analyzed 11 international projects in petrochemical and refinery field and also 7 investments in other different areas of chemical industry. The research highlighted that the management process of these investments can be improved trough the correct project integration, being able to provide a performing working environment able to sustain the management team in identifying the investment program criticalities and congestion points in order to be able to manage them in an efficient manner in order to assure the reach of the investment goal. Having as consequence the possibility to significant reduction of execution period, up to 16% and in the mean time also the delays related risks through a more efficient investment managerial act.

  8. The rationality of intuition: Studying adaptive heuristics in project decision-making

    DEFF Research Database (Denmark)

    Stingl, Verena; Geraldi, Joana

    This paper presents a research agenda for studying adaptive heuristics in project decision making. Project decisions are a potentially fruitful research field for adaptive heuristics. These decisions typically take place under time and information constraints, with high complexity and ambiguity...... - environments in which adaptive heuristics typically strive as effective decision tools. Yet, project decisions as a research topic introduce challenges that are currently not considered in the main body of adaptive heuristics research: the issue of group decision making, and the element of an unpredictable...... the limitations of these methods for project decision-making, and suggests alternative methodologies, suitable to cope with group decision-making and irreducible uncertainty....

  9. Data management for community research projects: A JGOFS case study

    Science.gov (United States)

    Lowry, Roy K.

    1992-01-01

    Since the mid 1980s, much of the marine science research effort in the United Kingdom has been focused into large scale collaborative projects involving public sector laboratories and university departments, termed Community Research Projects. Two of these, the Biogeochemical Ocean Flux Study (BOFS) and the North Sea Project incorporated large scale data collection to underpin multidisciplinary modeling efforts. The challenge of providing project data sets to support the science was met by a small team within the British Oceanographic Data Centre (BODC) operating as a topical data center. The role of the data center was to both work up the data from the ship's sensors and to combine these data with sample measurements into online databases. The working up of the data was achieved by a unique symbiosis between data center staff and project scientists. The project management, programming and data processing skills of the data center were combined with the oceanographic experience of the project communities to develop a system which has produced quality controlled, calibrated data sets from 49 research cruises in 3.5 years of operation. The data center resources required to achieve this were modest and far outweighed by the time liberated in the scientific community by the removal of the data processing burden. Two online project databases have been assembled containing a very high proportion of the data collected. As these are under the control of BODC their long term availability as part of the UK national data archive is assured. The success of the topical data center model for UK Community Research Project data management has been founded upon the strong working relationships forged between the data center and project scientists. These can only be established by frequent personal contact and hence the relatively small size of the UK has been a critical factor. However, projects covering a larger, even international scale could be successfully supported by a

  10. LHC related projects and studies - Part (I)

    International Nuclear Information System (INIS)

    Garoby, R.; Ponce, L.

    2012-01-01

    This session was the first of the two sessions dealing with future projects and the associated studies. Starting with descriptions of the plans and needs of the LHCb and ALICE experiments which are less extensively documented than those of ATLAS and CMS, it addressed the plans for the High Luminosity LHC and for the upgrade of the injectors, both for protons and other ions. (authors)

  11. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  12. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  13. Academy of Program/Project & Engineering Leadership: APPEL Case Studies

    Data.gov (United States)

    National Aeronautics and Space Administration — Case studies illustrate the kinds of decisions and dilemmas managers face every day, and as such provide an effective learning tool for project management. Due to...

  14. Academy of Program/Project & Engineering Leadership: Interactive Case Studies

    Data.gov (United States)

    National Aeronautics and Space Administration — Case studies illustrate the kinds of decisions and dilemmas managers face every day, and as such provide an effective learning tool for project management. Due to...

  15. A Study on the Management of Intellectual Property for the Pending Projects in KAERI

    International Nuclear Information System (INIS)

    Chung, W. S.; Yang, M. H.; Yun, S. W.; Lee, D. S.

    2011-01-01

    This study is to analysis legal status of intellectual property of the Jordan Researching and Training Reactor(JRTR). To get the goals, researching internal and international laws related with intellectual properties and reviewing the JRTR project are performed. Not only technology itself but also human resources joined the project are considered to find best solution for management. This study will be a good base for the JRTR project itself and other similar projects

  16. RISK ANALYSIS FOR SHIP CONVERTING PROJECT ACCOMPLISHMENT (Case study of KRI KP Converting Project

    Directory of Open Access Journals (Sweden)

    Dimas Endro W

    2013-10-01

    Full Text Available Ship converting has become as prospective activity in ship building area. Operational and economical aspect are the most dominant rationale. Baseon a new fuction of converted ship, a task list which contain several jobs that must be done is listed. This accomplishment schedule not only contain a task list, but also duration for certain job title. In practical apllication job duration is maintained based on experience of project manager.  Further more, total accomplish duration is setted as time accomplishment for the project. This setted time has become reference for the project bid. Occasionaly, if accomplishment time which offered is strict, than schedule slip become as potencial nightmare. For this situation, project manager has had a cristal clearconsideration to select a proper decision wheter he will take the tender offer or not. practically, project mananger has layed on his experience to handle previous project and face  penalty if the project delayed. This paper focussed on how to measure tender offer based on risk analysis, specially for converted ship tender which has a strike time accomplishment.A new application method to analysis proposed tender based on time and penalty parameter has become a topic of this paper.

  17. Correlational Study of Project Managers' Competence Experience, Education, and Technology Experience on Project

    Science.gov (United States)

    Hosford, Bryan

    2017-01-01

    Organizations continue to rely on information technology (IT) as a foundational element, yet poor IT project success continues to impact growth and innovation. Research into IT project success is widespread yet has focused on high-level project management attributes, not specific IT solutions. A review of the research literature revealed that the…

  18. Is a Clean Development Mechanism project economically justified? Case study of an International Carbon Sequestration Project in Iran.

    Science.gov (United States)

    Katircioglu, Salih; Dalir, Sara; Olya, Hossein G

    2016-01-01

    The present study evaluates a carbon sequestration project for the three plant species in arid and semiarid regions of Iran. Results show that Haloxylon performed appropriately in the carbon sequestration process during the 6 years of the International Carbon Sequestration Project (ICSP). In addition to a high degree of carbon dioxide sequestration, Haloxylon shows high compatibility with severe environmental conditions and low maintenance costs. Financial and economic analysis demonstrated that the ICSP was justified from an economic perspective. The financial assessment showed that net present value (NPV) (US$1,098,022.70), internal rate of return (IRR) (21.53%), and payback period (6 years) were in an acceptable range. The results of the economic analysis suggested an NPV of US$4,407,805.15 and an IRR of 50.63%. Therefore, results of this study suggest that there are sufficient incentives for investors to participate in such kind of Clean Development Mechanism (CDM) projects.

  19. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM: A Case-Study on Oil and Gas Projects, the Piping Process

    Directory of Open Access Journals (Sweden)

    Sung-Hwan Jo

    2018-05-01

    Full Text Available Engineering, Procurement, and Construction (EPC of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping works (prefabrication and installation occupying a majority of that schedule. As such, an effective methodology for scheduling, planning, and controlling of piping activities is essential for project success. To meet this need, this study used the Critical Chain Project Management (CCPM to develop a piping construction delay prevention methodology, incorporating material procurement processes for EPC megaprojects. Recent studies indicate that the traditional scheduling method used on oil and gas mega projects has critical limitations regarding resource scarcity, calculation of activity duration, and dealing with uncertainties. To overcome these limitations, the Theory of Constraints-based CCPM was proposed and implemented to provide schedule buffers management. Nonexistent in literature, and of critical importance, is this paper’s focus on the resource buffer, representing material uncertainty and management. Furthermore, this paper presents a step-by-step process and flow chart for project, construction, and material managers to effectively manage a resource buffer through the CCPM process. This study extends the knowledge of traditional resource buffers in CCPM to improve material and procurement management, thus avoiding the shortage of piping materials and minimizing delays. The resultant process was validated by both deterministic and probabilistic schedule analysis through two case studies of a crude pump unit and propylene compressor installation at a Middle Eastern Refinery Plant Installation. The results show that the CCPM method effectively handles uncertainty, reducing the duration of piping works construction by about a 35% when compared to the traditional method. Furthermore, the

  20. Marginal Productivity Gained Through Prefabrication: Case Studies of Building Projects in Auckland

    Directory of Open Access Journals (Sweden)

    Wajiha Shahzad

    2015-02-01

    Full Text Available Several studies have documented benefits of prefabrication system (prefab compared to the traditional building system (TBS. However, the documented benefits have been anecdotal or fragmented with reports of isolated case study projects. Few studies have looked at the objectively quantified benefits from statistical significance point of view and across building types in New Zealand. This study contributes to filling this knowledge gap by analyzing cost and time-savings, and productivity improvement achievable by the use of prefab in place of the TBS. Records of completion times and final contract values of 66 building projects implemented using prefab in Auckland were collected. The building types included commercial, houses, apartments, educational, and community buildings. The project details included final contract sums, completion dates, gross floor areas, and number of floors. Based on these details, the equivalent completion times and the final cost estimates for similar buildings implemented using the TBS were obtained from the Rawlinsons construction data handbook and feedback from some designers and contractors. Marginal productivity outcome for each building project was computed as the product of the cost and time-savings achieved using the prefab. Results showed that the use of prefab in place of TBS resulted in 34% and 19% average reductions in the completion times and costs, respectively. This also translated to overall 7% average improvement in the productivity outcomes in the building projects. Univariate ANOVA-based hypothesis test results showed that ‘building type’ had no significant effects on the cost and productivity improvement outcomes, but had significant effect on the time savings analyzed in the case study projects. The greatest productivity gain of 11% was achieved in house projects. These evidence-based results could guide optimized use of prefab for specific building application. The hypothesis-testing outcome

  1. ERGONOMIC ASPECTS IN THE PLANNING AND EXECUTION OF PROJECTS: A TEXTILE PRODUCTS DISTRIBUTION CENTER PROJECT CASE STUDY

    Directory of Open Access Journals (Sweden)

    Emerson Lourenço da Silva

    2013-01-01

    Full Text Available The planning and execution phases of a distribution center project of a large textile industry was made, evaluating the ergonomic aspects related to the operations to be performed in the facility and staff anthropometric data. The ergonomic collaborative analysis of the tasks associated with the method of movement plotting, guided the planning of the picking, manual induction and order consolidation areas from the distribution center. Using this methodology, it was possible to obtain a proper ergonomically project planning and execution of the three studied areas.

  2. Studying Student Benefits of Assigning a Service-Learning Project Compared to a Traditional Final Project in a Business Statistics Class

    Science.gov (United States)

    Phelps, Amy L.; Dostilio, Lina

    2008-01-01

    The present study addresses the efficacy of using service-learning methods to meet the GAISE guidelines (http://www.amstat.org/education/gaise/GAISECollege.htm) in a second business statistics course and further explores potential advantages of assigning a service-learning (SL) project as compared to the traditional statistics project assignment.…

  3. Projected study of neutronic decay of giant resonances and continuum states

    International Nuclear Information System (INIS)

    Blumenfeld, Y.; Chomaz, P.; Fortier, S.; Frascaria, N.; Gales, S.; Guillot, J.; Langevin, H.; Laurent, H.; Maison, J.M.; Nguyen Van Giai

    1988-01-01

    A project to study the decay of very excited states in nuclei is presented. A multidetector to measure these modes for excited structures situated beyond the neutron emission threshold is proposed. Coincidence experiments would allow a study of the wave functions of these elementary excitations and of the damping mechanisms in the nuclear domain. The definition of the characteristics of the system; tests to be carried out before selecting a detector; and nonscientific and nontechnical aspects of the project are also presented [fr

  4. Theory, modeling, and integrated studies in the Arase (ERG) project

    Science.gov (United States)

    Seki, Kanako; Miyoshi, Yoshizumi; Ebihara, Yusuke; Katoh, Yuto; Amano, Takanobu; Saito, Shinji; Shoji, Masafumi; Nakamizo, Aoi; Keika, Kunihiro; Hori, Tomoaki; Nakano, Shin'ya; Watanabe, Shigeto; Kamiya, Kei; Takahashi, Naoko; Omura, Yoshiharu; Nose, Masahito; Fok, Mei-Ching; Tanaka, Takashi; Ieda, Akimasa; Yoshikawa, Akimasa

    2018-02-01

    Understanding of underlying mechanisms of drastic variations of the near-Earth space (geospace) is one of the current focuses of the magnetospheric physics. The science target of the geospace research project Exploration of energization and Radiation in Geospace (ERG) is to understand the geospace variations with a focus on the relativistic electron acceleration and loss processes. In order to achieve the goal, the ERG project consists of the three parts: the Arase (ERG) satellite, ground-based observations, and theory/modeling/integrated studies. The role of theory/modeling/integrated studies part is to promote relevant theoretical and simulation studies as well as integrated data analysis to combine different kinds of observations and modeling. Here we provide technical reports on simulation and empirical models related to the ERG project together with their roles in the integrated studies of dynamic geospace variations. The simulation and empirical models covered include the radial diffusion model of the radiation belt electrons, GEMSIS-RB and RBW models, CIMI model with global MHD simulation REPPU, GEMSIS-RC model, plasmasphere thermosphere model, self-consistent wave-particle interaction simulations (electron hybrid code and ion hybrid code), the ionospheric electric potential (GEMSIS-POT) model, and SuperDARN electric field models with data assimilation. ERG (Arase) science center tools to support integrated studies with various kinds of data are also briefly introduced.[Figure not available: see fulltext.

  5. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  6. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  7. Chernobyl Studies Project - working group 7.0 environmental transport and health effects

    International Nuclear Information System (INIS)

    Hendrickson, S.M.

    1994-01-01

    The DOE-funded Chernobyl Studies Project was begun as part of a cooperative agreement between the US and the former USSR, (quote) To develop jointly methods to project rapidly the health effects of any future reactor accident (quote). Most of the initial tasks for this project are completed or near completion. The focus has now turned primarily to the issue of health effects from the Chernobyl accident. Currently, we are extensively engaged in case-control and cohort studies of thyroid diseases among Belarussian children and in the Ukraine. A major part of the effort is providing methods and applications of dose reconstruction and providing support and equipment for the medical teams. This document contains reports on progress in the following task areas: Management; External Dose; Hydrological Transport; Chromosome Painting Dosimetry; Stochastic Effects; Thyroid Studies; and Leukemia Studies

  8. Chernobyl Studies Project. Working Group 7.0, environmental transport and health effects

    International Nuclear Information System (INIS)

    Hendrickson, S.M.

    1994-01-01

    The focus of the Chernobyl Studies Project has now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams

  9. An Annotated List of New Social Studies Projects.

    Science.gov (United States)

    Knight, Merle M., Comp.

    The curriculum materials developed by 34 projects are described in this directory. The discussions are organized by discipline: Anthropology, Economics, Geography, History, Political Science, Social Psychology, Sociology, and General and Interdisciplinary. Each individual project note includes: project name, director, address, and a summary of the…

  10. Case study of the interdisciplinary integration in an IST-E3 project

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik

    2002-01-01

    Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission.......Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission....

  11. Methodological Issues In Forestry Mitigation Projects: A CaseStudy Of Kolar District

    Energy Technology Data Exchange (ETDEWEB)

    Ravindranath, N.H.; Murthy, I.K.; Sudha, P.; Ramprasad, V.; Nagendra, M.D.V.; Sahana, C.A.; Srivathsa, K.G.; Khan, H.

    2007-06-01

    There is a need to assess climate change mitigationopportunities in forest sector in India in the context of methodologicalissues such as additionality, permanence, leakage, measurement andbaseline development in formulating forestry mitigation projects. A casestudy of forestry mitigation project in semi-arid community grazing landsand farmlands in Kolar district of Karnataka, was undertaken with regardto baseline and project scenariodevelopment, estimation of carbon stockchange in the project, leakage estimation and assessment ofcost-effectiveness of mitigation projects. Further, the transaction coststo develop project, and environmental and socio-economic impact ofmitigation project was assessed.The study shows the feasibility ofestablishing baselines and project C-stock changes. Since the area haslow or insignificant biomass, leakage is not an issue. The overallmitigation potential in Kolar for a total area of 14,000 ha under variousmitigation options is 278,380 tC at a rate of 20 tC/ha for the period2005-2035, which is approximately 0.67 tC/ha/yr inclusive of harvestregimes under short rotation and long rotation mitigation options. Thetransaction cost for baseline establishment is less than a rupee/tC andfor project scenario development is about Rs. 1.5-3.75/tC. The projectenhances biodiversity and the socio-economic impact is alsosignificant.

  12. Decision making in inter‐corporate projects : A qualitative and quantitative study of project workers in automobile research and pre‐ development projects in Japan and Germany

    OpenAIRE

    Markkula, Petter

    2009-01-01

    This thesis is dealing with the integration of Japanese and German project workers in automobile inter‐corporate research/pre‐development projects. The focus is on better understanding the respective decision making process. As cultural differences play a big role in the way that people behave an extra focus was put on investigating this. The methods chosen for this study were quantitative research in the form of a questionnaire and qualitative research in the form of an interview series. For...

  13. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  14. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  15. LHC related projects and studies - Part (II)

    International Nuclear Information System (INIS)

    Rossi, L.; De Maria, R.

    2012-01-01

    The session was devoted to address some aspects of the HL-LHC (High Luminosity LHC) project and explore ideas on new machines for the long term future. The session had two parts. The former focused on some of the key issues of the HL-LHC projects: beam current limits, evolution of the collimation system, research plans for the interaction region magnets and crab cavities. The latter explored the ideas for the long term future projects (LHeC and HE-LHC) and how the current research-development program for magnets and RF structures could fit in the envisaged scenarios

  16. Mining exploitation of Imouraren.Complementary studies.Report of synthesis - volume I. and J. Project realization Economics variants and studies

    International Nuclear Information System (INIS)

    1980-07-01

    The object of volume I is to propose a plan for the Imouraren project realization. The study consists essentially of studies realization, supplies and construction and operator particular activities during investment period.This study : technical activities level to be attained and recommended method for their execution, project realization planning and overall complex investment costs mine, processing plant, utilities and general services, town and infrastructures. The aim of the volume J is to present studies result that have been carried out within three main directions : an essay of several procedure variants for the plant ; a modification of mining exploitation planning to minimize the overburden and obtain an average grade of maximum ore during first years functionment and economical studies in order to economically evaluate the project in many cases by calculating the internal rate of profit for many uranium sell prices and by utilizing as base investment costs and functioning project reference [fr

  17. Virtual Teaming and Collaboration Technology: A Study of Influences on Virtual Project Outcomes

    Science.gov (United States)

    Broils, Gary C.

    2014-01-01

    The purpose of this quantitative correlational study was to explore the relationships between the independent variables, contextual factors for virtual teams and collaboration technology, and the dependent variable, virtual project outcomes. The problem leading to the need for the study is a lower success rate for virtual projects compared to…

  18. Termites of the Savanna ecosystem project study area, Nylsvley

    CSIR Research Space (South Africa)

    Ferrar, P

    1982-09-01

    Full Text Available This report describes the termite fauna of the Savanna Ecosystem Project study area at the Nylsvley Nature Reserve, with an illustrated key for identification of species. Twenty-one species of fifteen genera and two families are recorded, and notes...

  19. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  20. A study on the development of the “Taiwan project management competence scale”

    Directory of Open Access Journals (Sweden)

    Kao I-Chan

    2017-01-01

    Full Text Available On the basis of the 46 competence elements in the International Project Management Association (IPMA ICB Version 3.0 and the PMP competence guidelines in PMBOK® Guide -- Fifth Edition by the Project Management Institute, this study formulates a “Preliminary Draft of the Taiwan Project Management Competence Scale”. After expert review, a pretest was developed for the Taiwan Project Management Competence Scale. With adult students in adult education institutions as the respondents, a pretest was conducted in order to collect data. Confirmatory factor analysis, and reliability analysis were then conducted to construct the “Taiwan Project Management Competence Scale”, which covers the four dimensions of project management of cognitive and conceptual competences, behavioral and technical competences, contextual competences, and moral and ethical competences. It is intended that this scale could be used as reference in future investigations into and measurement of project management competence in Taiwan, thus, facilitating the diagnosis, improvement, and refinement of performance in terms of project management competence.

  1. Detailed analysis of radon flux studies at Australian uranium projects

    International Nuclear Information System (INIS)

    Mudd, Gavin M.

    2005-01-01

    The release of radon gas and radon progeny from uranium projects is a major issue during operation as well as for the design of rehabilitation works. In Australia, there have been a number of premining radon flux studies as part of the environmental investigation and potential development of recent uranium projects. There is also an increasing amount of operational data on radon fluxes and loads from various aspects of projects, such as tailings, waste rock and mills. Thus there exists much useful measured data which can be used to assess the design radon flux and load targets for rehabilitation. The main projects for which radon data exists includes Ranger, Olympic Dam, Beverley, Honeymoon, Jabiluka, Yeelirrie, Lake Way, Koongarra, Moline, Coronation Hill, Rockhole, Nabarlek, Rum Jungle, Port Pirie and Ben Lomond. To date, much of this data has not been systematically evaluated. The need to compile and assess this data is twofold. Firstly, to assess the loads released from uranium production as an input into life-cycle analyses of the nuclear fuel cycle, such as those undertaken by UNSCEAR and industry groups. Secondly, there is a need to set suitable design standards for radon flux for the rehabilitation of former and current uranium projects. This paper will present such a detailed compilation of radon fluxes and loads which can then be used as the basis for both life-cycle analyses as well as setting appropriate site-specific rehabilitation criteria for radon. The implications for former and current projects is then discussed as well as future data needs. Ultimately, there is a critical need for thorough baseline surveys prior to mining to ensure accurate assessments of changes to radon fluxes and loads. The data and analysis presented is considered applicable to all uranium projects in Australia, as well as being a useful model for considering such issues internationally

  2. Study On Risk Handling Strategy Of Road Contruction Projects In Jayapura City

    Directory of Open Access Journals (Sweden)

    Irianto

    2017-08-01

    Full Text Available Project risk is an event or an uncertain condition which if it appears will have a threat on the project object. Many contractors still do not understand the threats that occur in the project they still assume that risks are always harmful. Based on data from the Papua Public Works procurement service that the implementation of road improvement projects always faces problems. This research is an explorative and descriptive study which explores the risks threats that occur in the project from the contractors perspective in Jayapura Papua Province Indonesia. The object of this research is the company contractor involved in the implementation of road improvement project in Jayapura whereas the respondent is the project manager and the field supervisor involved in the implementation of road improvement project The analysis result shows that the overall level of risk is in very low category and the biggest risks affecting contractors in sequence are 1 material delays from suppliers 2 material inventories 3 design difficulties 4 incorrectly shipped material volumes 5 changes to specifications by the owner 6 difficulty in obtaining materials and equipment 7 material price increases 8 over quality 9 damage to machine tools 10 weakening the bearing capacity of subgrade soil. While the response to risks threats that occur in road improvement projects is to reduce and avoid.

  3. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  4. Project STARS (Studies on Trajectories of Adolescent Relationships and Sexuality) : A longitudinal, multidomain study on sexual development of Dutch adolescents

    NARCIS (Netherlands)

    Reitz, Ellen; van de Bongardt, Daphne; Baams, Laura; Doornwaard, Suzan; Dalenberg, Wieke; Dubas, Judith; van Aken, Marcel; Overbeek, Geertjan; ter Bogt, Tom; van der Eijnden, Regina; Vanwesenbeeck, Ine; Kunnen, Saskia; Timmerman, Greetje; van Geert, Paul; Dekovic, Maja

    2015-01-01

    This study gives an overview of Project STARS (Studies on Trajectories of Adolescent Relationships and Sexuality), a four-wave longitudinal study of 1297 Dutch adolescents. First, the sample, measures and four sub-projects are described. Second, hierarchical regression analyses were conducted to

  5. Study on archive management for nuclear facility decommissioning projects

    International Nuclear Information System (INIS)

    Huang Ling; Gong Jing; Luo Ning; Liao Bing; Zhou Hao

    2011-01-01

    This paper introduces the main features and status of the archive management for nuclear facility decommissioning projects, and explores and discusses the countermeasures in its archive management. Taking the practice of the archive management system of a reactor decommissioning project as an example, the paper illustrates the establishment of archive management system for the nuclear facility decommissioning projects. The results show that the development of a systematic archive management principle and system for nuclear decommissioning projects and the construction of project archives for the whole process from the design to the decommissioning by digitalized archive management system are one effective route to improve the complete, accurate and systematic archiving of project documents, to promote the standardization and effectiveness of the archive management and to ensure the traceability of the nuclear facility decommissioning projects. (authors)

  6. A 1000 Arab genome project to study the Emirati population.

    Science.gov (United States)

    Al-Ali, Mariam; Osman, Wael; Tay, Guan K; AlSafar, Habiba S

    2018-04-01

    Discoveries from the human genome, HapMap, and 1000 genome projects have collectively contributed toward the creation of a catalog of human genetic variations that has improved our understanding of human diversity. Despite the collegial nature of many of these genome study consortiums, which has led to the cataloging of genetic variations of different ethnic groups from around the world, genome data on the Arab population remains overwhelmingly underrepresented. The National Arab Genome project in the United Arab Emirates (UAE) aims to address this deficiency by using Next Generation Sequencing (NGS) technology to provide data to improve our understanding of the Arab genome and catalog variants that are unique to the Arab population of the UAE. The project was conceived to shed light on the similarities and differences between the Arab genome and those of the other ethnic groups.

  7. Ecotourism Projects and Women's Empowerment:A Case Study in the Province of Bohol,Philippines

    OpenAIRE

    Pleno, Manuel Jose L.

    2006-01-01

    This paper examined the way in which successful ecotourism projects empowered women participants. Research sites were selected at barangay level by looking into two successful ecotourism projects launched by people's organizations in Bohol Province, Philippines. The researcher investigated the sociopolitical contexts of ecotourism projects that facilitate women's empowerment. This study analyzed the socio-political conditions before and during the implementation of ecotourism projects in Boho...

  8. Project Photofly: New 3d Modeling Online Web Service (case Studies and Assessments)

    Science.gov (United States)

    Abate, D.; Furini, G.; Migliori, S.; Pierattini, S.

    2011-09-01

    During summer 2010, Autodesk has released a still ongoing project called Project Photofly, freely downloadable from AutodeskLab web site until August 1 2011. Project Photofly based on computer-vision and photogrammetric principles, exploiting the power of cloud computing, is a web service able to convert collections of photographs into 3D models. Aim of our research was to evaluate the Project Photofly, through different case studies, for 3D modeling of cultural heritage monuments and objects, mostly to identify for which goals and objects it is suitable. The automatic approach will be mainly analyzed.

  9. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    NARCIS (Netherlands)

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  10. Is Project Towards No Drug Abuse (Project TND) an evidence-based drug and violence prevention program? A review and reappraisal of the evaluation studies.

    Science.gov (United States)

    Gorman, Dennis M

    2014-08-01

    This paper critically reviews the published evidence pertaining to Project Towards No Drug Abuse (Project TND). Publications from seven evaluation studies of Project TND are reviewed, and the results from these are discussed as related to the following outcomes: main effects on the use of cigarettes, alcohol and marijuana; main effects on the use of "hard drugs," defined in the evaluations as cocaine, hallucinogens, stimulants, inhalants, ecstasy and other drugs (e.g., depressants, PCP, steroids and heroin); subgroup and interaction analyses of drug use; and violence-related behaviors. Very few main effects have been found for cigarette, alcohol and marijuana use in the Project TND evaluations. While studies do report main effects for hard drug use, these findings are subject to numerous threats to validity and may be attributable to the data analyses employed. Similarly, while isolated subgroup and interaction effects were found for alcohol use among baseline nonusers and some violence-related behaviors in the early Project TND evaluations, these findings have not been replicated in more recent studies and may result from multiple comparisons between study conditions. In conclusion, there is little evidence to support the assertion that Project TND is an effective drug or violence prevention program. The broader implications of these findings for prevention science are discussed and suggestions are made as to how the quality of research in the field might be improved.

  11. A desk evaluation review of project MYA/6/015 hormonal studies on pituitary adrenal disorders. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell's viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell's viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project

  12. A desk evaluation review of project MYA/6/015 hormonal studies on pituitary adrenal disorders. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-09

    Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell`s viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell`s viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project.

  13. Developing Routines in Large Inter-organisational Projects: A Case Study of an Infrastructure Megaproject

    Directory of Open Access Journals (Sweden)

    Therese Eriksson

    2015-08-01

    Full Text Available General management research has increasingly recognised the significance of routines in organisational performance. Among organisational tasks, megaprojects depend more on routines selected and created within the project than standard, small-scale projects do, owing largely to their size, duration, and uniqueness. Within this context, the present paper investigates how project routines were established and developed during the early design phase of an inter-organisational megaproject. A case study of a large public infrastructure project was conducted, in which data were collected during observations, semi-structured interviews, and project document studies over the course of three years. Results of analysis revealed that the client exerted the greatest impact on choice of routines and that the temporary nature of tasks limited efforts to fine-tune routines. Changes in routines were primarily reactive to new knowledge concerning project needs. The findings suggest that meta-routines to consciously review routines should be used to a greater extent and designed to capture supplier experiences as well.

  14. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  15. Management of Stakeholders in Urban Regeneration Projects. Case Study: Baia-Mare, Transylvania

    Directory of Open Access Journals (Sweden)

    Corina M. Rădulescu

    2016-03-01

    Full Text Available The process of regeneration of abandoned areas or deteriorated structures in the cities of Romania has become a strategy of urban-integrated development. Conversions and/or regeneration of facilities in the form of assets, with different destinations, are part of the new trend of urban regeneration and a strategy used to attract investment capital. The disappearance of mining industry sites in Maramures County, Romania, has allowed the expansion and planning of new spaces for public use and/or semipublic, and most cities have opened new development perspectives. The study is based on empirical research conducted on the brownfields of Baia-Mare City. This research investigates how stakeholders of an urban regeneration project can be more actively involved in the decision-making processes with regard to the strategic elements of the renewal project of Cuprom, as a former mining industry area. This research contributes to the development of the investigation of new types of knowledge of stakeholder analysis and improves the available practices for stakeholder salience. Social networks created and consolidated by stakeholders of an urban regeneration project are the object of analysis, evaluation, and monitoring of the equilibrium between project management and grant of resources and capital. This paper studies the salience of stakeholders of the SEPA-CUPROM project from Baia-Mare using the social networking approach. Visualization by graphical methods of social networking analysis is a useful instrument in the decision-making process of brownfield projects as part of sustainable strategies in Romania.

  16. Double Beta Decay Experiments: Present Status and Prospects for the Future

    Science.gov (United States)

    Barabash, A. S.

    The review of modern experiments on search and studying of double beta decay processes is done. Results of the most sensitive current experiments are discussed. The main attention is paid to EXO-200, KamLAND-Zen, GERDA-I and CUORE-0 experiments. Modern values of T1/2(2ν) and best present limits on neutrinoless double beta decay and double beta decay with Majoron emission are presented. Conservative limits on effective mass of a Majorana neutrino ( at the level of ˜ (0.01-0.1) eV are discussed. The main attention is paid to experiments of CUORE, GERDA, MAJORANA, EXO, KamLAND-Zen-2, SuperNEMO and SNO+. Possibilities of low-temperature scintillating bolometers on the basis of inorganic crystals (ZnSe, ZnMoO4, Li2MoO4, CaMoO4 and CdWO4) are considered too.

  17. Fermeuse wind power project Newfoundland : noise and visual analysis studies

    Energy Technology Data Exchange (ETDEWEB)

    Henn, P.; Turgeon, J.; Heraud, P.; Belanger, S.; Dakousian, S.; Lamontagne, C.; Soares, D. [Helimax Energy Inc., Montreal, PQ (Canada); Basil, C.; Boulianne, S.; Salacup, S.; Thompson, C. [Skypower, Toronto, ON (Canada)

    2008-03-15

    This paper discussed the noise and visual analyses used to assess the potential impacts of a wind energy project on the east coast of the Avalon Peninsula near St. John's, Newfoundland. The proposed farm will be located approximately 1 km away from the town of Fermeuse, and will have an installed capacity of 27 MW from 9 turbines. The paper provided details of the consultation process conducted to determine acceptable distance and site locations for the wind turbines from the community. Stakeholders were identified during meetings, events, and discussions with local authorities. Consultations were also held with government agencies and municipal councils. A baseline acoustic environment study was conducted, and details of anticipated environmental impacts during the project's construction, operation, and decommissioning phases were presented. The visual analysis study was divided into the following landscape units: town, shoreline, forest, open land and lacustrine landscapes. The effect of the turbines on the landscapes were assessed from different viewpoints using visual simulation programs. The study showed that the visual effects of the project are not considered as significant because of the low number of turbines. It was concluded that the effect of construction on ambient noise levels is of low concern as all permanent dwellings are located at least 1 km away from the turbines. 2 refs., 4 tabs., 4 figs.

  18. MATURITY IN PROJECT MANAGEMENT: A STUDY OF EXISTING PRACTICES IN GOVERNMENT BODIES PERNAMBUCO

    Directory of Open Access Journals (Sweden)

    Antonio de Souza Silva Júnior

    2012-11-01

    Full Text Available Targets able to conquer the organization's business strategy give rise to projects that run the organization. And success in managing these projects is related to the skill level of the organization to manage them. With this, organizations need mature in the science and art of project management. This article is a case of study which seeks to identify the level of maturity and the management practices of public institutions in Pernambuco State. Therefore we conducted a quantitative survey to assess the level 2 of the Project Management Maturity Model, proposed by Kerzner (2006, and qualitative research in order to identify the management practices of the projects in the state. It can be concluded that public agencies in the State of Pernambuco did not reach the level 2 (common procedure of maturity in project management. The structured project management approach is not widely used yet. In many projects, the management is done empirically, with little interaction between the stakeholders, with no training for team work and proper risks treatment.

  19. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  20. Public summaries of feasibility studies conducted for the trinidad LNG project. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The study, conducted by The M. W. Kellog Company, was funded by the U.S. Trade and Development Agency on behalf of the National Gas Company of Trinidad and Tobago. It shows the results of Project Definition Phase which was implemented as a follow-up to two previous feasibility studies which were conducted for a LNG plant in Trinidad. The objective of this report is to develop a project design basis and implementation plan plus a cost estimate. The study is divided into the following sections: (1) Introduction; (2) Project Design Basis; (3) Seismic Hazard Assessment; (4) Geotechnical; and (5) Environmental Assessment.

  1. Methods and Management of the Healthy Brain Study: A Large Multisite Qualitative Research Project

    Science.gov (United States)

    Laditka, Sarah B.; Corwin, Sara J.; Laditka, James N.; Liu, Rui; Friedman, Daniela B.; Mathews, Anna E.; Wilcox, Sara

    2009-01-01

    Purpose of the study: To describe processes used in the Healthy Brain project to manage data collection, coding, and data distribution in a large qualitative project, conducted by researchers at 9 universities in 9 states. Design and Methods: Project management protocols included: (a) managing audiotapes and surveys to ensure data confidentiality,…

  2. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  3. Accident Investigation on a Large Construction Project: An Ethnographic Case Study

    OpenAIRE

    Oswald, David; Smith, Simon; Sherratt, Fred

    2015-01-01

    Unsafe acts are believed to account for approximately 80 to 90 percent of accidents. This paper will investigate this issue through exploring the reasoning behind the unsafe acts that resulted in a minor accident on a large construction project (+$1B) in the UK. The study described here, part of a wider PhD project, was undertaken using an ethnographic approach. Participant observation enabled the researcher to be involved in the whole accident investigation process including witness statemen...

  4. Two Eyes, 3D: A New Project to Study Stereoscopy in Astronomy Education

    Science.gov (United States)

    Price, Aaron; SubbaRao, M.; Wyatt, R.

    2012-01-01

    "Two Eyes, 3D" is a 3-year NSF funded research project to study the educational impacts of using stereoscopic representations in informal settings. The project funds two experimental studies. The first is focused on how children perceive various spatial qualities of scientific objects displayed in static 2D and 3D formats. The second is focused on how adults perceive various spatial qualities of scientific objects and processes displayed in 2D and 3D movie formats. As part of the project, two brief high-definition films about variable stars will be developed. Both studies will be mixed-method and look at prior spatial ability and other demographic variables as covariates. The project is run by the American Association of Variable Star Observers, Boston Museum of Science and the Adler Planetarium and Astronomy Museum with consulting from the California Academy of Sciences. Early pilot results will be presented. All films will be released into the public domain, as will the assessment software designed to run on tablet computers (iOS or Android).

  5. Great Lakes O shore Wind Project: Utility and Regional Integration Study

    Energy Technology Data Exchange (ETDEWEB)

    Sajadi, Amirhossein [Case Western Reserve Univ., Cleveland, OH (United States); Loparo, Kenneth A. [Case Western Reserve Univ., Cleveland, OH (United States); D' Aquila, Robert [General Electric (GE), Albany, NY (United States); Clark, Kara [National Renewable Energy Lab. (NREL), Golden, CO (United States); Waligorski, Joseph G. [FirstEnergy, Akron, OH (United States); Baker, Scott [PJM Interconnection, Audubon, PA (United States)

    2016-06-30

    This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

  6. Understanding lean & safety projects: analysis of case studies

    Directory of Open Access Journals (Sweden)

    Maria Crema

    2017-12-01

    Full Text Available Facing the current socio-economic contingency while guaranteeing a high level of care quality is particularly challenging in the field of healthcare. Through an integrated adoption of emerging managerial solutions, projects that allow organizations to achieve both efficiency and patient safety improvements could be implemented, thereby transposing policy directives towards a safer and more sustainable healthcare system. Therefore, the purpose of this paper is to investigate the features of Lean & Safety (L&S projects. Three Health Lean Management (HLM projects that had unexpected patient safety results were selected from the same region. Differences and similarities among the cases have been highlighted and interesting points of evidence have been noted. Despite the fact that the projects were pursuing similar objectives and benefiting from comparable support, the obtained changes had direct impact on patient safety enhancement in the cases that involved the front-office processes, and an indirect impact on patient safely for the L&S project that focused on back-office activities. The implementation processes and the Information and Communication Technologies (ICT adoption of the cases are also different.

  7. Application study of the project management on the nuclear power projects in China Institute of Atomic Energy

    International Nuclear Information System (INIS)

    Ji Cunxing

    2012-01-01

    The article introduced the actions of foreign and domestic nuclear power technical services in China Institute of Atomic Energy, the project management theory is applied to the organization, implementation and control of the nuclear power projects. It is analyzed the quality, schedule , investment etc of nuclear power projects, the improving measures and suggestions are bring forward on the project management organization, quality assurance, reduce cost etc. It will raise its nuclear power project management level in China Institute of Atomic Energy. (author)

  8. Project STARS (Studies on Trajectories of Adolescent Relationships and Sexuality) : A longitudinal, multi-domain study on sexual development of Dutch adolescents

    NARCIS (Netherlands)

    Reitz, Ellen; van de Bongardt, Daphne; Baams, Laura; Doornwaard, Suzan; Dalenberg, Wieke; Dubas, Judith; van Aken, Marcel; Overbeek, Geertjan; ter Bogt, Tom; van den Eijnden, Regina; Vanwesenbeeck, Wilhelmina; Kunnen, Saskia; Timmerman, Greetje; van Geert, Paul; Deković, Maja

    2015-01-01

    This study gives an overview of Project STARS (Studies on Trajectories of Adolescent Relationships and Sexuality), a four-wave longitudinal study of 1297 Dutch adolescents. First, the sample, measures and four sub-projects are described. Second, hierarchical regression analyses were conducted to

  9. Project STARS (Studies on Trajectories of Adolescent Relationships and Sexuality): A longitudinal, multi-domain study on sexual development of Dutch adolescents

    NARCIS (Netherlands)

    Reitz, E.; van de Bongardt, D.; Baams, L.; Doornwaard, S.; Dalenberg, W.; Dubas, J.; van Aken, M.; Overbeek, G.; ter Bogt, T.; van der Eijnden, R.; Vanwesenbeeck, I.; Kunnen, S.; Timmerman, G.; van Geert, P.; Deković, M.

    2015-01-01

    This study gives an overview of Project STARS (Studies on Trajectories of Adolescent Relationships and Sexuality), a four-wave longitudinal study of 1297 Dutch adolescents. First, the sample, measures and four sub-projects are described. Second, hierarchical regression analyses were conducted to

  10. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  11. An Exploratory Study of the Effects of Project Finance on Project Risk Management : How the Distinguishing Attributes of Project Finance affects the Prevailing Risk Factor?

    OpenAIRE

    Chan, Ka Fai

    2011-01-01

    Project finance is a financing arrangement for projects, and it is characterised by the creation of a legally independent project company financed with non- or limited recourse loans. It is observed that the popularity of project finance is increasing in the recent decades, despite of the impact of Asian financial crisis. Especially in emerging markets, project finance is very common among the public-private partnership projects. It is possible that project finance yields some benefits in pro...

  12. A study of images of Projective Angles of pulmonary veins

    Energy Technology Data Exchange (ETDEWEB)

    Wang Jue [Beijing Anzhen Hospital, Beijing (China); Zhaoqi, Zhang [Beijing Anzhen Hospital, Beijing (China)], E-mail: zhaoqi5000@vip.sohu.com; Yu Wei; Miao Cuilian; Yan Zixu; Zhao Yike [Beijing Anzhen Hospital, Beijing (China)

    2009-09-15

    Aims: In images of magnetic resonance and computed tomography (CT) there are visible angles between pulmonary veins and the coronary, transversal or sagittal section of body. In this study these angles are measured and defined as Projective Angles of pulmonary veins. Several possible influential factors and characters of distribution are studied and analyzed for a better understanding of this imaging anatomic character of pulmonary veins. And it could be the anatomic base of adjusting correctly the angle of the central X-ray of the angiography of pulmonary veins undergoing the catheter ablation of atrial fibrillation (AF). Method: Images of contrast enhanced magnetic resonance angiography (CEMRA) and contrast enhanced computer tomography (CECT) of the left atrium and pulmonary veins of 137 health objects and patients with atrial fibrillation (AF) are processed with the technique of post-processing, and Projective Angles to the coronary and transversal sections are measured and analyzed statistically. Result: Project Angles of pulmonary veins are one of real and steady imaging anatomic characteristics of pulmonary veins. The statistical distribution of variables is relatively concentrated, with a fairly good representation of average value. It is possible to improve the angle of the central X-ray according to the average value in the selective angiography of pulmonary veins undergoing the catheter ablation of AF.

  13. Environmental-impact assessment of dams and reservoir projects (review and a case study)

    International Nuclear Information System (INIS)

    Shah, S.M.

    2009-01-01

    Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)

  14. Educational Designs Supporting Student Engagement Through Network Project Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche

    2016-01-01

    Internationally, new pedagogical approaches emphasizing collaboration or learning in networks have been developed following the introduction of new technologies, especially the spread of social media. It is interesting to see such pedagogical developments in relation to similar approaches......, developed from the traditions of organizing university studies through student-driven project work and problem-driven learning approaches, which have been developed at the Danish universities of Roskilde and Aalborg as early as from the beginning of the 1970s. Specific educational designs integrating...... digital media are discussed, especially focusing on student engagement and the implications of organizing the pedagogical practice as networked project work. The discussions are based on the author’s experiences during 16 years of teaching and supervising at the Danish Master’s Program of ICT and Learning...

  15. Code of Conduct for wind-power projects - Feasibility study

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2009-02-01

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  16. Summaries of studies carried out in the NKS/BOK-2 project. Technical report

    International Nuclear Information System (INIS)

    Palsson, S.E.

    2002-12-01

    Summaries of studies carried out in the NKSBOK-2 project, Radiological and Environmental Consequences. The structure of the project as such is described in NKS-64, Radiological and Environmental Consequences - Final Report of the Nordic Nuclear Safety Research Project BOK-2. That report also includes compilations based on the summaries presented in this report. The project was carried out 1998-2001 with participants from all the Nordic countries. Representatives from the Baltic States were also invited to some of the meetings and seminars. The project consisted of work on terrestrial and marine radioecology and had a broad scope in order to enable participation of research groups with various fields of interest. The topics included improving assessment of old and recent fallout, use of radionuclides as tracers in Nordic marine areas, improving assessment of internal doses and use of mass spectrometry in radioecology. This report is a compilation of summaries from each research group, 32 papers in all, and gives references to papers published in scientific journals. Some of the studies have been described previously, at least to some degree, in NKS-70, Proceedings of the 8 th Nordic Seminar on Radioecology, 25-28 February 2001, Rovaniemi, Finland. (au)

  17. Destitution through “Development”: A Case Study of the Laka Laka Project in Cochabamba, Bolivia

    Directory of Open Access Journals (Sweden)

    Avrum J. Shriar

    2010-10-01

    Full Text Available This study examined environmental and socioeconomic outcomes of a water project in rural Bolivia, and sought insights on how and why its planning was so flawed. The project destroyed an ancient, sustainable irrigation system, and replaced it with one that provides insufficient and diminishing quantities of water to many fewer people, appears to be causing land degradation and groundwater depletion, and has fueled conflicts. The study shows that even relatively small, NGO-led projects can generate significant negative impacts, and raises questions about the pressures on development agencies to charge ahead with projects, despite obvious potential for such impacts.

  18. Existing Whole-House Solutions Case Study: Greenbelt Homes, Inc. Pilot Retrofit Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-06-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc., (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects that include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy-savings benefits of improvements. Phase 1—baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2—installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season; Phase 3—energy simulations supporting recommendations for HVAC and water heating upgrades.

  19. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  20. Research project on “A Study in Urban Air Pollution Improvement in Asia”

    OpenAIRE

    2017-01-01

    This final report of the joint research project “A study in urban air pollution improvement in Asia” is submitted by the Asian Institute of Technology (AIT) on behalf of the project team following the contract between AIT and the Japan International Cooperation Agency (JICA) for the project period of March 2015 - December 2017. Technical support is provided by the Asia Center for Air Pollution Research (ACAP) Japan and the operational support is provided by the Pollution Control Department (P...

  1. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  2. Saint John lateral pipeline project: comprehensive study report

    International Nuclear Information System (INIS)

    1999-02-01

    A descripion is given of the results of an environmental impact assessment of the construction of a natural gas pipeline that will bring gas from Maritimes and Northeast Pipeline Management Ltd.'s (M and NP) main transmission pipeline to clients in Lake Utopia and Saint John, NB. It will be 110 km long, and the Saint John lateral will join the mainline approximately 2 km south of Big Kedron Lake, NB. Various institutional, industrial, commercial and residential clients will be able to access the pipeline in the future, and it is intended to be capable of future expansion for markets along its route and for markets that become economically feasible in the future. A matrix was developed that relates environmental resources to Environmental Components of Concern (ECCs), and to the rationale for exclusion/inclusion of the ECC as a Valued Environmental Component (VECs). The positive benefits of the pipeline to clients in the Saint John area include: reduced dependence on foreign oil, fuel switching and price competition, lower air emission pollution, increased energy efficiency, and a source of energy that is secure and reliable. VECs were selected based on: concerns of various stakeholders including the public, community groups, scientific parties, Aboriginal groups, government officials and agencies, relevant regulations; relevant literature; and past evaluation experiences, including future developments of the proposed study area. Further selection of the VECs required an examination of the issues picked out via scoping to determine the ways in which the overall project could affect the ECCs, and included construction, operation, decommissioning/abandonment, malfunctions and accidents of the pipeline. The phases of the project as they impacted residually and cumulatively on the VECs were evaluated, and impacts on Valued Socio-Economic Components (VSCs) were assessed also. The mitigation efforts taken will minimize the potential effects of the project on VECs and VSCs

  3. Study on operation I and C DCS test method of EPR project

    International Nuclear Information System (INIS)

    Meng Ying; Lv Zhihong; Huang Xinnian; Fan Haiying; Li Zhuojia; Xiao Shushu

    2014-01-01

    Through summarization and optimization of the method for operation I and C DCS test of the European pressurized reactor project, the conclusions play a guiding role on the operation I and C DCS test of the domestic advanced nuclear power plant. The study of the method focuses on the test platform, the test process and the optimization of method of operation I and C DCS test with the practical experience. The reasonable and reliable test method for operation I and C DCS test of the European pressurized reactor project is worthy of the reference and the development in the project of the domestic advanced nuclear power plant. (authors)

  4. Independent Study Project, Topic: Topology.

    Science.gov (United States)

    Notre Dame High School, Easton, PA.

    Using this guide and the four popular books noted in it, a student, working independently, will learn about some of the classical ideas and problems of topology: the Meobius strip and Klein bottle, the four color problem, genus of a surface, networks, Euler's formula, and the Jordan Curve Theorem. The unit culminates in a project of the students'…

  5. Revitalisation of Orlík reservoir – case study of a regional restoration project

    Directory of Open Access Journals (Sweden)

    Ivana Očásková

    2014-06-01

    Full Text Available This case study describes the bottom-up formation of a regional project for restoring a reservoir. Land use changes in the upper Vltava river basin caused the eutrophication of Orlík reservoir, which resulted in water blooms, which in association with socio-economic changes caused a decline in tourism in this region and serious difficulties for local people. The study examines how public awareness helped in the establishment of a restoration project, its framework and strategy. Regional governance of the project management took into consideration both knowledge-based solutions and the interests of local people and municipalities. The project has the potential for resolving both environmental and socio-economic problems and providing a sustainable win-win strategy for the region, residents, tourists and stakeholders.

  6. Location Independent Professional Project: A Pilot Study

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  7. only: A Case Study In Projective Meaning

    OpenAIRE

    Craige Roberts

    2010-01-01

    I offer an integrated theory of the meaning of only in which the prejacent, while not presupposed, is both entailed and backgrounded, hence tends to project (following a general proposal about projection due to Simons et al. 2010). Moreover, I argue, contra Beaver & Brady (2008), that only is not conventionally associated with focus, the focus effects arising instead pragmatically. But I do adopt aspects of their semantics for only, including the presupposition of a pre-order over the ele...

  8. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  9. Mrica Hydroelectric Project: a study in partnering

    International Nuclear Information System (INIS)

    Loraine, R.K.; Bannmark, O.

    1993-01-01

    This paper describes the contractual and financial aspects of the Mrica Project. Of particular interest is the high degree of cooperation that developed between the various parties, and the effect this had on the progress and completion of the project. This relationship had its origin in the need to make the best use of the relatively scarce funds available. It was vitally important that problems were solved jointly and that costs did not escalate as a result of confrontation between the parties. In this respect, the project was an early manifestation of the contractual relationship now called partnering, and the procedures adopted at Mrica are very similar to those now widely used in partnering contracts. The paper is therefore structured to identify and analyse the key elements of co-operation, and their impact on both the negotiation of the contracts and the completion of the works. (Author)

  10. Study of tidal power projects in the UK, with the exception of the Severn barrage

    International Nuclear Information System (INIS)

    Shaw, T.L.

    1997-01-01

    Several estuaries in the UK could be equipped with barrages and tidal power plants and several projects were proposed and studied from the end of the 1960's and 1989, until the electric power industry was privatized. Five projects revealed to be more promising than others: the Conwy estuary in the north of Wales, for which the feasibility study concluded that there was no serious environmental constraints on the project; Duddon, a little bit more in the north, which appears to be not economically interesting; Loughor, in the south of Wales, a small size project for which no advanced ecological consequences studies were carried out; Mersey, near Liverpool, the most important project (700 MW) which stands a good chance of being realized; the Wyre estuary, between Duddon and Mersey, for which the cost seems to be prohibitive. The economical conditions which started in the 1980's are largely responsible for the stand-by of any of these projects. The tide power kWh production cost continues to be viewed as two times more expensive than it would be with a classical power plant. Of course, this cost takes into account the actions for environmental protection. (J.S.)

  11. Computing with words to feasibility study of software projects

    Directory of Open Access Journals (Sweden)

    Marieta Peña Abreu

    2017-02-01

    Full Text Available Objective: This paper proposes a method to analyze the technical, commercial and social feasibility of software projects in environments of uncertainty. It allows working with multiple experts and multiple criteria and facilitates decision-making. Method: The proposal contains two phases, first the necessary information is collected and in second place projects are evaluated using 2-tuple linguistic representation model. The experts are selected by analyzing their curricular synthesis. The evaluation criteria are defined using the technique Focus Group and weighted in the interval (0,1 according to their importance. three domains are offered to express the preferences: numeric, interval-valued and linguistic. For aggregation extended arithmetic mean and weighted average extended are used, preventing the loss of information. A 2-tuple (feasibility, precision is obtained as a result for each project. Results: The evaluation of P1 project was a very high feasibility with -0,33 of precision. The P2 project obtained a high feasibility with 0,38 of precision and P3 project achieved a medium feasibility with -0,21 of precision. Conclusions: This method is favorable for software projects feasibility analysis with presence of multiple experts and criteria, in environments of uncertainty. It tries heterogeneous assessments without loss of information. Their results are consistent and useful for decision makers.

  12. Project approach study for nuclear power plants in the Netherlands

    International Nuclear Information System (INIS)

    1985-11-01

    The new nuclear program in the Netherlands comprises the construction of two to four nuclear power plants up to the year 2000. The main objective pursued with the implementation of the nuclear program is the supply of low-cost electricity in the future. In order to prepare the program and to provide a basis for further decisions, the Ministry of Economic Affairs has entrusted Motor-Columbus Consulting Engineers Inc., Baden, Switzerland, with a study to determine the most suitable project approach option(s) for the implementation of the future nuclear program in the Netherlands. In carrying out this study, Motor-Columbus investigated the following main project approach options: 1. turnkey contract approach; 2. split-package contract approach; 3. multi-contract approach. It is concluded that if applied in the appropriate way, the normal turnkey contract approach represents the most suitable approach under the prevailing situation in the Netherlands. (orig.)

  13. A comparative study between matched and mis-matched projection/back projection pairs used with ASIRT reconstruction method

    International Nuclear Information System (INIS)

    Guedouar, R.; Zarrad, B.

    2010-01-01

    For algebraic reconstruction techniques both forward and back projection operators are needed. The ability to perform accurate reconstruction relies fundamentally on the forward projection and back projection methods which are usually, the transpose of each other. Even though the mis-matched pairs may introduce additional errors during the iterative process, the usefulness of mis-matched projector/back projector pairs has been proved in image reconstruction. This work investigates the performance of matched and mis-matched reconstruction pairs using popular forward projectors and their transposes when used in reconstruction tasks with additive simultaneous iterative reconstruction techniques (ASIRT) in a parallel beam approach. Simulated noiseless phantoms are used to compare the performance of the investigated pairs in terms of the root mean squared errors (RMSE) which are calculated between reconstructed slices and the reference in different regions. Results show that mis-matched projection/back projection pairs can promise more accuracy of reconstructed images than matched ones. The forward projection operator performance seems independent of the choice of the back projection operator and vice versa.

  14. A comparative study between matched and mis-matched projection/back projection pairs used with ASIRT reconstruction method

    Energy Technology Data Exchange (ETDEWEB)

    Guedouar, R., E-mail: raja_guedouar@yahoo.f [Higher School of Health Sciences and Techniques of Monastir, Av. Avicenne, 5060 Monastir, B.P. 128 (Tunisia); Zarrad, B., E-mail: boubakerzarrad@yahoo.f [Higher School of Health Sciences and Techniques of Monastir, Av. Avicenne, 5060 Monastir, B.P. 128 (Tunisia)

    2010-07-21

    For algebraic reconstruction techniques both forward and back projection operators are needed. The ability to perform accurate reconstruction relies fundamentally on the forward projection and back projection methods which are usually, the transpose of each other. Even though the mis-matched pairs may introduce additional errors during the iterative process, the usefulness of mis-matched projector/back projector pairs has been proved in image reconstruction. This work investigates the performance of matched and mis-matched reconstruction pairs using popular forward projectors and their transposes when used in reconstruction tasks with additive simultaneous iterative reconstruction techniques (ASIRT) in a parallel beam approach. Simulated noiseless phantoms are used to compare the performance of the investigated pairs in terms of the root mean squared errors (RMSE) which are calculated between reconstructed slices and the reference in different regions. Results show that mis-matched projection/back projection pairs can promise more accuracy of reconstructed images than matched ones. The forward projection operator performance seems independent of the choice of the back projection operator and vice versa.

  15. A method to study the management of urban development projects

    NARCIS (Netherlands)

    Heurkens, E.

    2011-01-01

    The management of urban development projects in the Netherlands has changed significantly in recent years. These projects have become mainly ‘led’ by developers as they manage the entire life cycle of development projects, while public actors mainly facilitate development projects. This changes the

  16. AN APPROACH TO MANAGING UNIVERSITY STUDENTS’ SELF-STUDY BASED ON INTERDISCIPLINARY E-PROJECTS

    Directory of Open Access Journals (Sweden)

    Yu. V. Krasavina

    2017-01-01

    Full Text Available Introduction. There are two tendencies considerably allocated in educational process of the modern higher school: the increasing amount of time for independent work of students and the active introduction of the information and communication technologies (ICT which is followed by its continuous updating and improvement. The article contributes to the problem of managing competency-based and professionally-oriented self-study for future teachers; the suggested method combines the advantages of project-based learning and the use of ICT.Aim. The objective of the paper is to assess the efficacy of interdisciplinary e-project-based approach to managing university students’ self-study.Methods. To evaluate the efficacy of such innovative method as interdisciplinary e-projects, we use quantitative and qualitative assessment. A set of quantitative pre- and post-surveys are administered for students in order to evaluate their learning outcomes and competencies development. Students’ motivation and attitudes were evaluated through questionnaires, interviews and discussions. An expert group appraisal method was used to define assessment components. Results. The groups of didactic properties and ICT didactic functions are allocated and analysed. Types of educational projects are presented. Definition and characteristic of the interdisciplinary e-project are given. Results of the pedagogical experiment conducted in M. T. Kalashnikov Izhevsk State University are described; the technology of development among students of foreign-language and information-communication competences as the most important professional ones is approved.Scientific novelty. The method of interdisciplinary e-projects is offered; it involves a set of the educational-informative techniques and procedures realized in the electronic environment and directed to the solution of the interdisciplinary problem connected with types and tasks of vocational activity

  17. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  18. Social impacts of community renewable energy projects: findings from a woodfuel case study

    International Nuclear Information System (INIS)

    Rogers, Jennifer C.; Simmons, Eunice A.; Convery, Ian; Weatherall, Andrew

    2012-01-01

    There is much current interest in the potential of community-based renewable energy projects to contribute to transition towards low carbon energy systems. As well as displacing fossil fuel consumption by increasing renewable energy generation, projects are expected to have a range of social impacts which may result in additional positive sustainability outcomes. These include potential to increase: acceptance of renewable energy developments; awareness of renewable and sustainable energy technologies and issues; uptake of low carbon technologies; and sustainable/pro-environmental behaviours. To date however, there has been little investigation of whether and how these impacts occur. This paper presents results from qualitative research investigating the social impacts of a community woodfuel project as experienced by project participants and other local stakeholders. Findings show projects can raise awareness of renewable energy technologies and increase uptake of renewables. Overall the case study project successfully changed the local social context for development of woodfuel heating, reducing risk for all involved in the future development of this sector, particularly in the immediate locality. There was some evidence of increased engagement with wider sustainability issues but this was limited to direct participants, suggesting local projects need to be supported by wider systemic change to maximise impacts. - Highlights: ► We assessed the social impacts of a community woodfuel project. ► The project increased awareness and uptake of woodfuel heating. ► Impacts were achieved as a result of the locally-specific approach. ► Local projects can seed cultural change promoting transition to a low carbon society.

  19. Project of experimental study on plasma waves and plasma turbulence

    International Nuclear Information System (INIS)

    Ferreira, J.L.

    1990-09-01

    The objective of this project is to perform experiments with wave phenomena on plasmas. Particular attention will be given to Langmuir and whistler waves due to its relations with several phenomena occuring on space and laboratory plasmas. The new concepts of particle acceleration with electromagnetic waves, the auroral phenomena on the polar regions and the charged particle precipitation to the atmosphere through anomalies of the earth magnetic field are examples where these waves have an important role. In this project we intend to study the propagation of these waves in a quiescent plasma machine. This machine is able to produce a plasma with density and temperature with values similar to what is met in the ionosphere. This project will be a part of the activities of the basic plasma group of the INPE's Associated Plasma Laboratory (LAP). It will have the collaboration of the departments of Aeronomy and Geophysics also from INPE, and the collaboration of the Plasma and Gas Physics Laboratory from University of Paris - South, in France. (author)

  20. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    Science.gov (United States)

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  1. Academic Librarians and Project Management: An International Study

    Science.gov (United States)

    Serrano, Silvia Cobo; Avilés, Rosario Arquero

    2016-01-01

    Because information and documentation units in libraries have responsibility for an ever-increasing number of projects, this paper aims at analyzing the discipline of project management in library and information science (LIS) from a professional perspective. To that end, the researchers employed quantitative and qualitative methodology based on a…

  2. Leadership in Project Management: A Study of the Relationship between Leadership Styles and Industry Type on Project Success

    Science.gov (United States)

    Barrantes-Guevara, Rita I.

    2013-01-01

    Every year organizations invest billions of dollars in Information Technology (IT) projects; however, IT project success rates continue to be low. Several critical success factors are mentioned in the research literature, the leadership skills of the project manager being one of the most frequently cited in the recent project management…

  3. Sustainability in Open Source Software Commons: Lessons Learned from an Empirical Study of SourceForge Projects

    OpenAIRE

    Charles M. Schweik

    2013-01-01

    In this article, we summarize a five-year US National Science Foundation funded study designed to investigate the factors that lead some open source projects to ongoing collaborative success while many others become abandoned. Our primary interest was to conduct a study that was closely representative of the population of open source software projects in the world, rather than focus on the more-often studied, high-profile successful cases. After building a large database of projects (n=174,33...

  4. Environmental impact studies of projects be licensed under the Atomic Law

    International Nuclear Information System (INIS)

    Heuel-Fabianek, Burkhard; Lennartz, Reinhard

    2009-01-01

    The German Law on Environmental Impact Assessment (UVPG) defines projects to be licensed under the Atomic Law that require an environmental impact study (EIS). Since the project concepts as defined in the UVPG are often not the same as those defined in the Atomic Law (AtG), the licensing authority has to decide which project should be subjected to an EIA. Additionally, Article 37 of the EURATOM Treaty obliges every Member State to communicate certain data relating to the impact of emissions of radioactive substances to the Commission. This is independent of the EIA. A licence may only be granted by the competent authorities if an opinion has been received from the Commission pursuant to Article 37. In either case, the licensing authority is the first point of contact for the applicant if the question arises of whether a project has to be subjected to an EIA. A ''voluntary'' EIA should be regarded with caution because of the complexity of such a procedure within the licensing process requiring considerable resources of time and manpower, and the danger of a loss of credibility of the EIA. (orig.)

  5. Data harmonization and federated analysis of population-based studies : the BioSHaRE project

    NARCIS (Netherlands)

    Doiron, Dany; Burton, Paul; Marcon, Yannick; Gaye, Amadou; Wolffenbuttel, Bruce H R; Perola, Markus; Stolk, Ronald P; Foco, Luisa; Minelli, Cosetta; Waldenberger, Melanie; Holle, Rolf; Kvaløy, Kirsti; Hillege, Hans L; Tassé, Anne-Marie; Ferretti, Vincent; Fortier, Isabel

    2013-01-01

    ABSTRACTS BACKGROUND: Individual-level data pooling of large population-based studies across research centres in international research projects faces many hurdles. The BioSHaRE (Biobank Standardisation and Harmonisation for Research Excellence in the European Union) project aims to address these

  6. Assessment Of Carbon Leakage In Multiple Carbon-Sink Projects: ACase Study In Jambi Province, Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Boer, Rizaldi; Wasrin, Upik R.; Hendri, Perdinan; Dasanto,Bambang D.; Makundi, Willy; Hero, Julius; Ridwan, M.; Masripatin, Nur

    2007-06-01

    Rehabilitation of degraded forest land throughimplementation of carbon sink projects can increase terrestrial carbonstock. However, carbon emissions outside the project boundary, which iscommonly referred to as leakage, may reduce or negate the sequestrationbenefits. This study assessed leakage from carbon sink projects thatcould potentially be implemented in the study area comprised of elevensub-districts in the Batanghari District, Jambi Province, Sumatra,Indonesia. The study estimates the probability of a given land use/coverbeing converted into other uses/cover, by applying a logit model. Thepredictor variables were: proximity to the center of the land use area,distance to transportation channel (road or river), area of agriculturalland, unemployment (number of job seekers), job opportunities, populationdensity and income. Leakage was estimated by analyzing with and withoutcarbon sink projects scenarios. Most of the predictors were estimated asbeing significant in their contribution to land use cover change. Theresults of the analysis show that leakage in the study area can be largeenough to more than offset the project's carbon sequestration benefitsduring the period 2002-2012. However, leakage results are very sensitiveto changes of carbon density of the land uses in the study area. Byreducing C-density of lowland and hill forest by about 10 percent for thebaseline scenario, the leakage becomes positive. Further data collectionand refinement is therefore required. Nevertheless, this study hasdemonstrated that regional analysis is a useful approach to assessleakage.

  7. Survival of the project: a case study of ICT innovation in health care.

    Science.gov (United States)

    Andreassen, Hege K; Kjekshus, Lars Erik; Tjora, Aksel

    2015-05-01

    From twenty years of information and communication technology (ICT) projects in the health sector, we have learned one thing: most projects remain projects. The problem of pilotism in e-health and telemedicine is a growing concern, both in medical literature and among policy makers, who now ask for large-scale implementation of ICT in routine health service delivery. In this article, we turn the question of failing projects upside down. Instead of investigating the obstacles to implementing ICT and realising permanent changes in health care routines, we ask what makes the temporary ICT project survive, despite an apparent lack of success. Our empirical material is based on Norwegian telemedicine. Through a case study, we take an in-depth look into the history of one particular telemedical initiative and highlight how ICT projects matter on a managerial level. Our analysis reveals how management tasks were delegated to the ICT project, which thus contributed to four processes of organisational control: allocating resources, generating and managing enthusiasm, system correction and aligning local practice and national policies. We argue that the innovation project in itself can be considered an innovation that has become normalised in health care, not in clinical, but in management work. In everyday management, the ICT project appears to be a convenient tool suited to ease the tensions between state regulatory practices and claims of professional autonomy that arise in the wake of new public management reforms. Separating project management and funding from routine practice handles the conceptualised heterogeneity between innovation and routine within contemporary health care delivery. Whilst this separation eases the execution of both normal routines and innovative projects, it also delays expected diffusion of technology. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. Investigation and Prioritizing Outsourcing of Information and Communication Technology (ICT Projects (Case Study: ICT Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Seyed Ehsan Khansarizadeh

    2015-03-01

    Full Text Available Outsourcing IT functions is being developed as a replacement for implementing IT projects or rendering IT services within organizations. Organizations’ past experiences in outsourcing indicate that this process poses variety of risks and problems. This study is aimed to identify and prioritize the risks of outsourcing IT infrastructure projects. Classifying risks of outsourcing along with incorporating thematic experts’ experiences through the Delphi method, reveals various risks associated with the employer and the contractor as the primary sources of risks as well as general risks and chronological risks which occur in the periods before, during and after contracts. A total of 22 main risks were identified and categorized. Afterwards, based on the opinions obtained from thematic experts and using the Analytic Hierarchy Process, different types of risks were prioritized. The results suggest that those risks arising due to failings of structure and content are more important than those of technical and contextual knowledge.

  9. PROJECT MANAGEMENT OFFICE – LINK BETWEEN ORGANIZATIONAL STRATEGIC AND OPERATIONAL: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Mario Manzini Cianfanelli

    2014-12-01

    Full Text Available The objective of this work is to demonstrate the organizational integration achieved through the implementation of a project management office (PMO, created to combat the loss of water distribution in one of the business units of Basic Sanitation Company of the State of São Paulo – Sabesp. The methodology used to achieve this goal was the study of a single case in which the information was obtained through documentary research and semi-structured interviews. The results showed how this integration was achieved with the adoption of a standard methodology in project management, control based on information technology and the spread of the organization's strategy in the sectors below. This work concluded that with this implantation of the project management office it was possible to improve the planning and the control of the activities of the projects through a pattern methodology in managing projects that gave possibilities to create a new culture focusing in solving problems.

  10. Conceptual study of SCRUM and CCPM combined application in multiple project flexible management

    Directory of Open Access Journals (Sweden)

    Ilton Marchi de Almeida

    2016-11-01

    Full Text Available Project Management (PM has gained a major role in the viability of organizational strategic objectives. The development of products and services has been under increasing market pressure, demanding frequent releases in ever-shorter time periods. To meet these new requirements, PM has to provide the information needed to make decisions in multiple complex projects that are exposed to uncertainty and volatility. Regarding the opportunities to improve PM practices in order to deal with this unstable and ambiguous environment, the aim of this paper is to propose, by means of a conceptual literature analysis, the combined application of two PM methodologies: Critical Chain Project Management (CCPM, and SCRUM. The results of this study indicate that integration of these methodologies can enhance the benefits and mitigate the weaknesses of each of them. This hybrid model could enable better articulation and coordination of project tasks, allowing more effective decisions to be made in multiple project environments affected by volatility, uncertainty, complexity and ambiguity (VUCA.

  11. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  12. Study and Proposal of the Nuclear Power Plant Technology for the Ninh Thuan 2 Project

    International Nuclear Information System (INIS)

    Tran Chi Thanh; Le Van Hong; Hoang Sy Than; Nguyen Van De; Mai Dinh Trung; Nguyen Nhi Dien; Nguyen Minh Tuan; Pham Van Lam; Phan Ngoc Tuyen; Do Chi Dung; Hoang Minh Giang; Le Dai Dien

    2015-01-01

    The Ninh Thuan 1&2 Nuclear Power Plant Projects were approved on November 25th, 2009. At present, the task of NPP technology selection of these projects is an important and complex task. This report will show the acceptable method to create a set of criterion for selecting technology for Ninh Thuan 2 NPP project. The result of evaluation of three NPP technologies, such as ATMEA1, AP1000 and MPWR+ introduced in the Feasibility Study Reports of this project, will be discussed. In conclusion, the AP1000 technology is the first candidate for the Ninh Thuan 2 NPP Project. (author)

  13. Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

    Science.gov (United States)

    Khadem, Mohammad Miftaur Rahman Khan; Piya, Sujan; Shamsuzzoha, Ahm

    2017-09-01

    The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert's opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project's on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.

  14. Study of 3D solder-paste profilometer by dual digital fringe projection

    Science.gov (United States)

    Juan, Yi-Hua; Yih, Jeng-Nan; Cheng, Nai-Jen

    2013-09-01

    In a 3D profilometer by the fringe projection, the shadow will be produced inevitably, thus the fringes cannot be detected in the region of the shadow. In addition, a smooth surface or a metal surface produces the specular reflection, and then, no projection fringe can be recorded in the region of oversaturation on CCD. This paper reveals a proposed system for improved these defects and shows some preliminary improved 3D profiles by the proposed dual fringe projection. To obtain the profile of sample hided in the shadow and the oversaturation, this study used the dual-projection system by two projectors. This system adopted two different directions of fringe projection and illuminates them alternately, therefore, the shadow and the oversaturation produced in their corresponding locations. Two raw 3D profiles obtained from taking the dual-projection by the four-step phase-shift. A set of algorithms used to identify the pixels of the shadow and the oversaturation, and create an error-map. According to the error-map to compensate, two 3D profiles merged into an error-reduced 3D profile. We used the solder paste as a testing sample. After comparatively analyzing the 3D images obtained by our measurement system and by a contact stylus profilometer, the result shows that our measurement system can effectively reduce the error caused by shadows and oversaturation. Fringe projection system by using a projector is a non-contact, full field and quickly measuring system. The proposed dual-projection by dual-projectors can effectively reduce the shadow and the oversaturation errors and enhance the scope of application of the 3D contour detection, especially in the detection of precision structure parts with specular reflection.

  15. Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-08-01

    Full Text Available The construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract The question is, was the optimum implementation accomplished? The provision for the success of the project is how are the daily activities managed by the three stakeholders of the project (contractor, owner, and consultant and their technical and practical capability to attain the balance of the project fundamental points (cost, time and quality taking into account the project objectives that were set by the owner. Despite the way, logical framework management and project’s major steps there is a group of elements which become major measures to determine the success or failure of the project, the research interested in these elements by a thorough study of references related to the success of a constructional project. To reinforce the theoretical study a field assessment of the housing project; this led to the recognition of the major elements that caused breaches of the evaluation criteria. The closed questionnaire and the regular forms based on the data and information collected through the theoretical review and the closed questionnaire to conclude and examine some concepts related by assessing the quality of building materials used in residential investment projects through the stages (planning - design-implementation Through the research a lot of deductions were made, the most important is that there cannot be an evaluation system

  16. Estimating the greenhouse gas benefits of forestry projects: A Costa Rican Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Busch, Christopher; Sathaye, Jayant; Sanchez Azofeifa, G. Arturo

    2000-09-01

    If the Clean Development Mechanism proposed under the Kyoto Protocol is to serve as an effective means for combating global climate change, it will depend upon reliable estimates of greenhouse gas benefits. This paper sketches the theoretical basis for estimating the greenhouse gas benefits of forestry projects and suggests lessons learned based on a case study of Costa Rica's Protected Areas Project, which is a 500,000 hectare effort to reduce deforestation and enhance reforestation. The Protected Areas Project in many senses advances the state of the art for Clean Development Mechanism-type forestry projects, as does the third-party verification work of SGS International Certification Services on the project. Nonetheless, sensitivity analysis shows that carbon benefit estimates for the project vary widely based on the imputed deforestation rate in the baseline scenario, e.g. the deforestation rate expected if the project were not implemented. This, along with a newly available national dataset that confirms other research showing a slower rate of deforestation in Costa Rica, suggests that the use of the 1979--1992 forest cover data originally as the basis for estimating carbon savings should be reconsidered. When the newly available data is substituted, carbon savings amount to 8.9 Mt (million tones) of carbon, down from the original estimate of 15.7 Mt. The primary general conclusion is that project developers should give more attention to the forecasting land use and land cover change scenarios underlying estimates of greenhouse gas benefits.

  17. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    Energy Technology Data Exchange (ETDEWEB)

    Bonnal, P. [CERN; Féral, B. [CERN; Kershaw, K. [CERN; Nicquevert, B. [CERN; Baudin, M. [Ecole Normale Superieure; Lari, L. [ESS, Lund; Le Cardinal, J. [Chatenay-Malabry, Ecole Centrale

    2016-07-15

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies and development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.

  18. Belo Monte hydropower project: actual studies; AHE Belo Monte: os estudos atuais

    Energy Technology Data Exchange (ETDEWEB)

    Figueira Netto, Carlos Alberto de Moya [CNEC Engenharia S.A., Sao Paulo, SP (Brazil); Rezende, Paulo Fernando Vieira Souto [Centrais Eletricas Brasileiras S.A. (ELETROBRAS), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    This article presents the evolution of the studies of Belo Monte Hydro Power Project (HPP) since the initial inventory studies of the Xingu River in 1979 until the current studies for conclusion of the Technical, Economic and Environmental Feasibility Studies the Belo Monte Hydro Power Project, as authorized by Brazilian National Congress. The current studies characterize the Belo Monte HPP with an installed capacity of 11,181.3 MW (20 units of 550 MW in the main power house and 7 units of 25.9 MW in the additional power house), connected to the Brazilian Interconnected Power Grid, allowing to generate 4,796 mean MW of firm energy, without depending on any flow rate regularization of the upstream Xingu river flooding only 441 k m2, of which approximately 200 k m2, correspond to the normal annual wet season flooding of the Xingu River. (author)

  19. Decision Process Analysis on Project Priority Strategy: A Case Study of an ICT Design Firm

    Directory of Open Access Journals (Sweden)

    Vincent F. Yu

    2014-01-01

    Full Text Available Project priority strategy is the benchmarking of a corporate operation management strategy and in particular is used by a projects-based research and development firm in the complex competence environment of the information and communication technology (ICT industry. This research takes the variables of external environments and internal resources into account for a firm’s market, technology, and finance assets in order to present a decision process on a project priority strategy. This empirical study also addresses the key factors of the interaction between business on a project development’s supply chain: clients, the examined firm, and suppliers. The findings indicate that a profit-driven project can dominate the firm’s strategic operations and management from the resource-based view and analytic hierarchy process technique perspectives. At the same time, the analysis results contribute significant values to project decision management, which is highly recommended for small-medium enterprises conducting product/project development, project portfolio management, and strategic business management.

  20. A Case Study of Teaching Marketing Research Using Client-Sponsored Projects: Method, Challenges, and Benefits

    Science.gov (United States)

    Bove, Liliana L.; Davies, W. Martin

    2009-01-01

    This case study outlines the use of client-sponsored research projects in a quantitative postgraduate marketing research subject conducted in a 12-week semester in a research-intensive Australian university. The case study attempts to address the dearth of recent literature on client-sponsored research projects in the discipline of marketing.…

  1. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  2. Feasibility study for Tashkent Heat and Power Plant Modernizing Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was carried out of the project for energy conservation and greenhouse effect gas emission reduction by introducing the newest and most powerful gas turbine cogeneration facilities to the Tashkent cogeneration plant in Uzbekistan. At the Tashkent cogeneration plant, each of the facilities is being superannuated, which leads to lowering of operational reliability and increase in cost of repairs. In the project, studied was the introduction of the newest and most powerful gas turbine cogeneration facilities with heat output of 100 Gcal/h equivalent to that of one can of the existing hot water boiler and with generated output of 80MW. As a result of the study, obtained were the energy conservation amount of 83.9 ktoe/y and the greenhouse effect gas reduction amount of 179.7 kt-CO2/y. The initial investment amount was 10.003 billion yen. Expenses vs. effects were 8.39 toe/y-million yen in energy conservation amount and 18.0 t-CO2/y-million yen in greenhouse effect gas reduction amount. In the study of profitability, the internal earning rate was 9.24% after tax, the return yield of capital was 41.26%, and the period of ROI was 16.9 years. (NEDO)

  3. PMP Project Management Professional Exam Study Guide

    CERN Document Server

    Heldman, Kim

    2011-01-01

    Completely updated for the 2011 version of the PMP exam! If you're preparing for the Project Management Professional (PMP) exam, this thorough book is what you need. Not only does it reflect the very latest version of the exam, it is written by popular project management expert Kim Heldman—author of the five previous editions of this top-selling book—and it also includes a CD with practice exams, exam prep software, electronic flashcards, and over two hours of additional audio review. All exam objectives, as well as essential PMP topics, concepts, and key terms are covered.Prepares

  4. ASP project. Dissolved oxygen issues in ASP project

    Directory of Open Access Journals (Sweden)

    M.Y. Bondar

    2018-03-01

    Full Text Available The article presents the latest results of studies about the effect of dissolved oxygen on the efficiency of the ASP flooding project implemented by Salym Petroleum Development N.V.. Pilot project on experimental injection of anionic surfactant solutions, soda and polymer into the reservoir for enhanced oil recovery (ASP project has been implemented since 2016. The stability of one of the components of the ASP polymer is strongly dependent on the presence of iron, stiffness cations and dissolved oxygen in the water. Since the polymer is used for injection at two stages of the project, which are essential and the longest, at the design stage of ASP project a whole complex of polymer protection had been established against negative factors, in particular from the influence of oxygen, which causes not only oxygen corrosion but also irreversible destruction polymer chains. In the paper, studies on the stability of polymer solutions are described, an analysis of viscosity loss with time in the presence of iron and oxygen for polymer solutions is carried out. The choice of chemical deoxygenation method for the control of dissolved oxygen is substantiated. The program of laboratory studies of the ASP project and the analytical instruments used are described. The technological scheme of the ASP process is presented, and recommendations for the implementation of the technology are given.

  5. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  6. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  7. Angular-momentum-projected cranked HFB approach to the study of nuclear rotations

    International Nuclear Information System (INIS)

    Wuest, E.; Ansari, A.; Mosel, U.

    1985-01-01

    Employing a pairing-plus-quadrupole interaction hamiltonian and projecting out good angular momentum states from the cranked Hartree-Fock-Bogoliubov (CHFB) intrinsic wave functions the yrast spectra of 158 Dy and 168 Yb are calculated up to moderately high spins (Isub(max)=16) as to include the backbending region. Then the variation of pairing correlation, g-factor and rotational alignment of neutron spin as a function of total angular momentum is studied. The effect of particle number projection on the spin-projected CHFB wave functions is also investigated and is found to be unimportant for the calculation of g-factors. On the other hand, corrections of the excitation energies for number fluctuations in the CHFB wave functions are essential. Furthermore, looking at the distribution of the total projection quantum number K in various cranking wave functions we are able to throw some light on the Knot=0 nature of the aligned s-band. A variation-after-spin projection calculation strictly for the axial shape, without cranking, is also carried out for both the nuclei considered here. In the low-spin region this numerically 'cheaper' scheme produces energy spectra similar to that of the CHFB method, and may thus be used to readjust the interaction parameters. (orig.)

  8. Laboratory and field studies related to the Hydrology/Radionuclide Migration Project

    International Nuclear Information System (INIS)

    Thompson, J.L.

    1991-05-01

    This annual report describes research conducted in FY 1990 by Los Alamos National Laboratory for the Hydrology/Radionuclide Migration Project. This multi-agency project measures the underground movement of radionuclides related to nuclear testing at the Nevada Test Site. This project continues the long-term experiment at the site of the Cambric nuclear test. Water pumped from a well adjacent to the explosion cavity continues to show decreasing amounts of tritium and Krypton 85 but no Cesium 139. Analyses of drillback debris shows a distinction between refractory and volatile materials in respect to both their location in the test cavity and their leachability with groundwater. We surveyed materials used during nuclear testing to evaluate any post-test hazard; we concluded that most such materials pose a minimal hazard. The Los Alamos drilling program provided an opportunity for us to sample a collapsed zone above the cavity of a test, which was fired 2 years ago. We continue our research in colloid characterization and in detection of low levels of Technetium 99 in Nevada Test Site water. During FY 1990, we drilled a new hole in the Yucca Flat area to study radionuclide migration. This report also describes Los Alamos management and planning activities in support of this project. 20 refs., 2 figs., 14 tabs

  9. M.S. independent research study : partnering on small construction project

    OpenAIRE

    Conley, Michael A

    1997-01-01

    This investigation will address the possibility that partnering concepts are underutilized in small government projects. If Government Contracting Officers utilized partnering concepts on small construction projects, there could be a potential for saving millions of dollars annually. The primary objective of this report is to inform Contracting Officers of the benefits of partnering on small construction projects. Small projects will be considered to have a value of less than $3 million, mid-...

  10. Balancing risk in regulatory decision making: the Port Granby Project case study

    International Nuclear Information System (INIS)

    Benitez, L.; Kleb, H.

    2011-01-01

    The purpose of this paper is to review the trade-offs that are routinely considered in regulatory decision making, and the policy basis and methods for making those trade-offs. Regulatory decisions under the Canadian Environmental Assessment Act (CEAA) and the Nuclear Safety and Control Act (NSCA) normally consider potential risks to the environment, human health and safety, if a project were to proceed. There is only limited consideration, under such circumstances, of the risks to the environment, human health and safety if the project were not to proceed. The focus is on the potential adverse effects of the project, except in the event of an emergency, where the focus shifts to the economic and other beneficial effects. The Port Granby long-term low-level radioactive waste management project is a project to clean up and provide appropriate local, long-term management of historic low-level radioactive waste (LLRW) in the Port Granby, Ontario area. Approximately 0.4 M m 3 of LLRW, presently located at the Port Granby Waste Management Facility, is to be transported to a newly constructed long-term waste management facility ~700 m north of the bluff face where the facility is located. Accordingly, the project is subject to environmental assessment and licensing processes under the CEAA and the NSCA, respectively. While the Port Granby Project does not represent an emergency situation, it does represent a situation that could result in a significant degree of environmental risk if the project were not to proceed. Over the course of the various studies that have been undertaken at the Waste Management Facility, it has become apparent that the facility is subject to erosion and gullying along the bluff face. The potential for the leaching of contaminants from the existing facility and the erosion of the Lake Ontario bluffs are recognized as ongoing risks that will continue and potentially worsen if the project does not proceed. The economic and other considerations that

  11. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  12. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  13. Challenges in Doctoral Research Project Management: A Comparative Study

    Directory of Open Access Journals (Sweden)

    Reuven Katz

    2016-03-01

    Full Text Available This paper presents quantitative results of a comparative study evaluating the management skills of doctoral candidates working toward a PhD and additional information related to their lifestyles. We conducted a survey among enrolled doctoral candidates at five universities in Israel and three technological universities in Western Europe. 1013 Israeli candidates and 457 Western European candidates replied to our survey. In our analysis, we compared the answers of Israeli Science and Engineering candidates to those of Social Sciences and Humanities candidates; in addition, we compared the answers of Israeli Science and Engineering students to their Western European peers. Our analysis focused on finding significant patterns by comparing these groups of students. In order to identify such patterns, we analyzed each question using the Pearson chi-square test. The current study’s main finding is that the majority of candidates, regardless of their chosen academic field or the region where they study, have no training or expertise in managing a doctoral research project. Based on these findings, we suggest that all doctoral candidates be taught basic research-project management. We believe that such training will provide them with a powerful tool for better managing their research as they advance towards successful completion of their doctorate.

  14. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  15. Project-Based Social Justice Mathematics: A Case Study of Five 6th Grade Students

    Science.gov (United States)

    McHugh, Maighread L.

    2015-01-01

    The purpose of this qualitative multiple case study was to explore how five sixth grade female students navigated the process of project-based learning as they designed and implemented their own project centered on mathematics while using a social justice lens. The theoretical frameworks of Authentic Intellectual Work and Social Justice…

  16. Case study B. Architectural design management using a project web

    NARCIS (Netherlands)

    DeClerck, F.; Pels, H.J.; Otter, den A.F.H.J.; Emmitt, S.; Prins, M.; Otter, den A.F.

    2009-01-01

    In this chapter the use and organization of use of a project website is described in the design and realization of a construction project. The case concerns a complicated project with a high number of different parties involved, managed by an architectural office and having an internationally

  17. A Pilot Study: Facilitating Cross-Cultural Understanding with Project-Based Collaborative Learning in an Online Environment

    Science.gov (United States)

    Shadiev, Rustam; Hwang, Wu-Yuin; Huang, Yueh-Min

    2015-01-01

    This study investigated three aspects: how project-based collaborative learning facilitates cross-cultural understanding; how students perceive project-based collaborative learning implementation in a collaborative cyber community (3C) online environment; and what types of communication among students are used. A qualitative case study approach…

  18. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  19. Measuring Student Career Interest within the Context of Technology-Enhanced STEM Projects: A Cross-Project Comparison Study Based on the Career Interest Questionnaire

    Science.gov (United States)

    Peterman, Karen; Kermish-Allen, Ruth; Knezek, Gerald; Christensen, Rhonda; Tyler-Wood, Tandra

    2016-12-01

    This article describes Energy for ME and Going Green! Middle Schoolers Out to Save the World, two Science, Technology, Engineering, and Mathematics (STEM) education programs with the common goal of improving students' attitudes about scientific careers. The authors represent two project teams, each with funding from the National Science Foundation's ITEST program. Using different approaches and technology, both projects challenged students to use electricity monitoring system data to create action plans for conserving energy in their homes and communities. The impact of each project on students' career interests was assessed via a multi-method evaluation that included the Career Interest Questionnaire (CIQ), a measure that was validated within the context of ITEST projects and has since become one of the instruments used most commonly across the ITEST community. This article explores the extent to which the CIQ can be used to document the effects of technology-enhanced STEM educational experiences on students' career attitudes and intentions in different environments. The results indicate that the CIQ, and the Intent subscale in particular, served as significant predictors of students' self-reported STEM career aspirations across project context. Results from each project also demonstrated content gains by students and demonstrated the impact of project participation and gender on student outcomes. The authors conclude that the CIQ is a useful tool for providing empirical evidence to document the impact of technology-enhanced science education programs, particularly with regard to Intent to purse a STEM career. The need for additional cross-project comparison studies is also discussed.

  20. Ferrocyanide safety project ferrocyanide aging studies. Final report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Hallen, R.T.; Alderson, E.V.

    1996-06-01

    This final report gives the results of the work conducted by Pacific Northwest National Laboratory (PNNL) from FY 1992 to FY 1996 on the Ferrocyanide Aging Studies, part of the Ferrocyanide Safety Project. The Ferrocyanide Safety Project was initiated as a result of concern raised about the safe storage of ferrocyanide waste intermixed with oxidants, such as nitrate and nitrite salts, in Hanford Site single-shell tanks (SSTs). In the laboratory, such mixtures can be made to undergo uncontrolled or explosive reactions by heating dry reagents to over 200 degrees C. In 1987, an Environmental Impact Statement (EIS), published by the U.S. Department of Energy (DOE), Final Environmental Impact Statement, Disposal of Hanford Defense High-Level Transuranic and Tank Waste, Hanford Site, Richland, Washington, included an environmental impact analysis of potential explosions involving ferrocyanide-nitrate mixtures. The EIS postulated that an explosion could occur during mechanical retrieval of saltcake or sludge from a ferrocyanide waste tank, and concluded that this worst-case accident could create enough energy to release radioactive material to the atmosphere through ventilation openings, exposing persons offsite to a short-term radiation dose of approximately 200 mrem. Later, in a separate study (1990), the General Accounting Office postulated a worst-case accident of one to two orders of magnitude greater than that postulated in the DOE EIS. The uncertainties regarding the safety envelope of the Hanford Site ferrocyanide waste tanks led to the declaration of the Ferrocyanide Unreviewed Safety Question (USQ) in October 1990

  1. Quality function deployment (QFD in the development of training projects: an exploratory study for service

    Directory of Open Access Journals (Sweden)

    Francisco José Dias Junior

    2012-01-01

    Full Text Available Training is important in preparing employees. The Quality Function Deployment (QFD is an effective method to systematically translate customer requirements into project specifications. This study presents the use of QFD method in development of training project. It is a qualitative research conducted in the industry services company. The results show that the use of QFD is an effective alternative for managers to develop or improve their training projects.

  2. Effects of Business Model Development Projects on Organizational Culture: A Multiple Case Study of SMEs

    Directory of Open Access Journals (Sweden)

    Ulla Santti

    2017-08-01

    Full Text Available Previous research has shown that links between organizational culture and innovativeness/performance may act as a “social glue” that helps a company develop organizational culture as a competitive advantage. In this study of three case companies, the organizational culture change due business model development projects is studied using the Competing Values Framework (CVF tool and interviews with respondents about discovered changes. To reveal intervention and implied effects between business model development project and organizational culture changes, we used CIMO logic (context, intervention, mechanism, and outcome to bridge practice and theory by explanatory, backward-looking research. Our case studies of companies in relatively short-duration business model development projects indicate that organizational culture may have some dynamic characteristics, for example, an increase of the adhocracy organizational type in all case companies or an increase in the hierarchical leadership type in one case company. Thus, the development of an organizational culture type can be partly controlled. Our results also indicated business model development projects do have a minor effect on organizational culture, even when development activities have not been put fully into practice. However, the more comprehensively business model development project activities have been put into practice, the larger the effect on organizational culture.

  3. Improving Initiation and Tracking of Research Projects at an Academic Health Center: A Case Study.

    Science.gov (United States)

    Schmidt, Susanne; Goros, Martin; Parsons, Helen M; Saygin, Can; Wan, Hung-Da; Shireman, Paula K; Gelfond, Jonathan A L

    2017-09-01

    Research service cores at academic health centers are important in driving translational advancements. Specifically, biostatistics and research design units provide services and training in data analytics, biostatistics, and study design. However, the increasing demand and complexity of assigning appropriate personnel to time-sensitive projects strains existing resources, potentially decreasing productivity and increasing costs. Improving processes for project initiation, assigning appropriate personnel, and tracking time-sensitive projects can eliminate bottlenecks and utilize resources more efficiently. In this case study, we describe our application of lean six sigma principles to our biostatistics unit to establish a systematic continual process improvement cycle for intake, allocation, and tracking of research design and data analysis projects. The define, measure, analyze, improve, and control methodology was used to guide the process improvement. Our goal was to assess and improve the efficiency and effectiveness of operations by objectively measuring outcomes, automating processes, and reducing bottlenecks. As a result, we developed a web-based dashboard application to capture, track, categorize, streamline, and automate project flow. Our workflow system resulted in improved transparency, efficiency, and workload allocation. Using the dashboard application, we reduced the average study intake time from 18 to 6 days, a 66.7% reduction over 12 months (January to December 2015).

  4. New Zealand Curriculum Innovation in Historical and Political Context: The Freyberg Integrated Studies Project and Parallel Projects of the 1940s.

    Science.gov (United States)

    McKinnon, David H.; And Others

    1991-01-01

    Describes curricular and pedagogical experimentation in humanities and social studies instruction conducted in New Zealand immediately after World War II. Compares such developments with the Freyberg Integrated Studies Project, a later three-year curriculum development and research program. Concludes that the Freyberg model provides support for…

  5. Principal elements of the Basalt Waste Isolation Project performance assessment studies

    International Nuclear Information System (INIS)

    Baca, R.G.; Wilde, R.T.

    1983-12-01

    In this paper, three of the principal elements of the Basalt Waste Isolation Project (BWIP) performance assessment studies are focused on: (1) development of a methodology for probabilistic risk assessment, (2) performance analyses of repository subsystems, and (3) selection and ranking of disruptive event scenarios. Other elements of the BWIP performance assessment studies are briefly outlined. 12 references, 5 figures

  6. Interdisciplinary Project-Based Learning through an Environmental Water Quality Study

    Science.gov (United States)

    Juhl, Lorie; Yearsley, Kaye; Silva, Andrew J.

    1997-12-01

    An interdisciplinary environmental water quality study was designed and conducted to enhance training and employability of chemical and environmental technician students in associate degree programs. Four project objectives were identified as a means to enhance the educational experience and employability of our students: provide experience on analytical instrumentation for organic compounds (gas chromatography/mass spectrometry, GC/MS), require interdisciplinary group interactions and problem solving, provide experience with Environmental Protection Agency (EPA) procedures, and require cooperation with state agencies/private organizations. Students worked in groups that included representatives from both programs to develop project objectives and a Sampling and Analysis Plan (SAP) following EPA standards. Input from personnel at Idaho's Department of Environmental Quality and Bureau of Laboratories and from volunteers in an environmental "watch dog" organization called the Henry's Fork Foundation aided students in the development and implementation of their SAP. Subsequently, groups sampled sections of the Henry's Fork River and analyzed for organic, inorganic, and fecal contaminants. Analysis included EPA method 525.2 for pesticides using GC/MS. Data from all river segments was shared and each group submitted a final report analyzing results. Surveys completed by students and instructors indicate that the project is a successful teaching method allowing introduction of new skills as well as review of important technical and employability skills.

  7. CLIC project R&D studies: the magnet system for the 3 TEV

    CERN Document Server

    Modena, Michele

    2017-01-01

    This Note presents the R&D activities done and coordinated by TE-MSC Group on the magnetic system for the CLIC (Compact Linear Collider) project. The main aspects investigated are: the magnetic system definition, basic design for all magnets (i.e. a CLIC Magnet Catalogue), powering and cost evaluation, advanced design and prototyping for the most critical magnet variants. The CLIC layout here considered is the one for the highest collision energy of 3 TeV. This layout was the one studied in detail as baseline for the CLIC Conceptual Design Report that was released in 2012. This Note summarize the activities of about 6 years (2010-2016) done with the contribution of CERN staff (part-time), the contribution of some CERN Project Associates sponsored by the CLIC Project and in collaboration with STCF Daresbury Laboratory (UK).

  8. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  9. Probability-of-success studies for geothermal projects: from subsurface data to geological risk analysis

    Science.gov (United States)

    Schumacher, Sandra; Pierau, Roberto; Wirth, Wolfgang

    2017-04-01

    In recent years, the development of geothermal plants in Germany has increased significantly due to a favorable political setting and resulting financial incentives. However, most projects are developed by local communities or private investors, which cannot afford a project to fail. To cover the risk of total loss if the geothermal well should not provide the energy output necessary for an economically viable project, investors try to procure insurances for this worst case scenario. In order to issue such insurances, the insurance companies insist on so called probability-of-success studies (POS studies), in which the geological risk for not achieving the necessary temperatures and/or flow rates for an economically successful project is quantified. Quantifying the probability of reaching a minimum temperature, which has to be defined by the project investors, is relatively straight forward as subsurface temperatures in Germany are comparatively well known due tens of thousands of hydrocarbon wells. Moreover, for the German Molasse Basin a method to characterize the hydraulic potential of a site based on pump test analysis has been developed and refined in recent years. However, to quantify the probability of reaching a given flow rate with a given drawdown is much more challenging in areas where pump test data are generally not available (e.g. the North German Basin). Therefore, a new method based on log and core derived porosity and permeability data was developed to quantify the geological risk of reaching a determined flow rate in such areas. We present both methods for POS studies and show how subsurface data such as pump tests or log and core measurements can be used to predict the chances of a potential geothermal project from a geological point of view.

  10. Hydrological and geological preliminary studies in the scope of the RMB project

    International Nuclear Information System (INIS)

    Ferreira, Vinicius V.M.; Barreto, Alberto A.; Aleixo, Bruna L.

    2011-01-01

    The RMB - Brazilian Multipurpose Reactor is a project that will contribute decisively in order to develop the science and the technology of the country. However, the licensing process of this facility is not a simple task, since it involves nuclear and environmental questions. The utilization of geoprocessing tools became in the last years an important technique to aid the development of several studies, and will be necessary also in this project. The objective of this work is to present the first hydrological and geological geoprocessing studies done in order to support the future environmental licensing process of the facility. The results show that further efforts should be done since there is a lack of many data needed for the next steps. (author)

  11. Implementing service improvement projects within pre-registration nursing education: a multi-method case study evaluation.

    Science.gov (United States)

    Baillie, Lesley; Bromley, Barbara; Walker, Moira; Jones, Rebecca; Mhlanga, Fortune

    2014-01-01

    Preparing healthcare students for quality and service improvement is important internationally. A United Kingdom (UK) initiative aims to embed service improvement in pre-registration education. A UK university implemented service improvement teaching for all nursing students. In addition, the degree pathway students conducted service improvement projects as the basis for their dissertations. The study aimed to evaluate the implementation of service improvement projects within a pre-registration nursing curriculum. A multi-method case study was conducted, using student questionnaires, focus groups with students and academic staff, and observation of action learning sets. Questionnaire data were analysed using SPSS v19. Qualitative data were analysed using Ritchie and Spencer's (1994) Framework Approach. Students were very positive about service improvement. The degree students, who conducted service improvement projects in practice, felt more knowledgeable than advanced diploma students. Selecting the project focus was a key issue and students encountered some challenges in practice. Support for student service improvement projects came from action learning sets, placement staff, and academic staff. Service improvement projects had a positive effect on students' learning. An effective partnership between the university and partner healthcare organisations, and support for students in practice, is essential. Copyright © 2013 Elsevier Ltd. All rights reserved.

  12. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    Directory of Open Access Journals (Sweden)

    Argaw Tarekegn Gurmu

    2016-09-01

    Full Text Available This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry-wide survey to prioritize the best practices. Accordingly, project start-up plan, traffic control plan, machinery positioning strategy, project completion plan, and dynamic site layout plan were shown to be the top five best practices for construction methods. The study also revealed that high levels of implementation of best practices are associated with low levels of project delays. The use of best practices also varied according to the project costs. There were no discernible differences between the top five best practices. The authors suggest that they should be implemented jointly to improve productivity in building projects. Contractors could use the logistic regression model developed, to predict the probability of exceeding a baseline productivity factor and, on that basis, implement corrective actions to achieve the desired level of productivity.

  13. Critical Success Factors of Mobile Application Development Projects: A Qualitative Study

    Directory of Open Access Journals (Sweden)

    Hamza Khastar

    2016-07-01

    Full Text Available This study seeks to identify the critical success factors of teams in the application-development project. To achieve this goal, a qualitative approach and content analysis was utilized. Semi-structured interviews with 14 developers and experts was performed for data collection. A systematic review of previous research shows that after 9 critical success factors. With the analysis interviews, the CSf's raised to 12; including user experience, strategy and project management, support and promotion, business models, planning and goal setting, financial and budgeting, marketing and customer needs, infrastructure, technical issues and design, contextual factors, teamwork and staffing. The results show that the customer experience, teamwork and contextual factors are core categories in the research paradigm model.

  14. How should grid operators govern smart grid innovation projects? An embedded case study approach

    International Nuclear Information System (INIS)

    Reuver, Mark de; Lei, Telli van der; Lukszo, Zofia

    2016-01-01

    Grid operators increasingly have to collaborate with other actors in order to realize smart grid innovations. For routine maintenance, grid operators typically acquire technologies in one-off transactions, but the innovative nature of smart grid projects may require more collaborate relationships. This paper studies how a transactional versus relational approach to governing smart grid innovation projects affects incentives for other actors to collaborate. We analyse 34 cases of smart grid innovation projects based on extensive archival data as well as interviews. We find that projects relying on relational governance are more likely to provide incentives for collaboration. Especially non-financial incentives such as reputational benefits and shared intellectual property rights are more likely to be found in projects relying on relational governance. Policy makers that wish to stimulate smart grid innovation projects should consider stimulating long-term relationships between grid operators and third parties, because such relationships are more likely to produce incentives for collaboration. - Highlights: • Smart grids require collaboration between grid operators and other actors. • We contrast transactional and relational governance of smart grid projects. • Long-term relations produce more incentives for smart grid collaboration. • Non-financial incentives are more important in long-term relations. • Policy makers should stimulate long-term relations to stimulate smart grids.

  15. Attribute Hierarchy of Conflicts in Construction Projects: A Case Study of Sindh

    Directory of Open Access Journals (Sweden)

    Shabbir Hussain Khahro

    2015-10-01

    Full Text Available Conflicts seem to arise throughout the life cycle of the construction project and in result, these may lead to several other issues such as project cost overrun, time overrun, productivity loss, loss of profit and above all damage of business relationships in general and specifically in construction industry. Hence, this paper focuses on various direct and indirect causes leading to conflicts in construction industry of Sindh, Pakistan. Detailed literature review and interviews have been carried out to identify several direct and indirect causes of conflicts and finally, a set of questionnaire has been designed and distributed to get expert opinion on the significance of these causes in this sector. The data has been analyzed by RIW (Relative Importance Weight method. The outcome of this study shows that payment delay is the major direct cause of conflicts in the construction projects followed by contractual claims, public interruption, poor communication and site conditions. Thus, it is suggested that proper attention should be given to the above mentioned concerns so as to have a uniform flow of construction project life cycle without any interruption.

  16. The Study of Nursing Care project: back to the future for contemporary nursing research?

    Science.gov (United States)

    Smith, Kylie M; Crookes, Patrick A

    2012-11-01

      To discuss the Study of Nursing Care project, an initiative from the late 1970s in the UK. The article explores the impact of the Study of Nursing Care on nursing research, and considers to what extent it presents a useful model for contemporary nursing research.   It is acknowledged internationally that the nursing academic workforce is ageing and dwindling. Many possible solutions are being debated with all agreeing that the next generation of evidence based nurse leaders is urgently required.   In this article, the authors survey existing workforce schemes, describe the Study of Nursing Care series, published in the 1970s, and draw on interviews and correspondence conducted in 2009 with four of the original Study of Nursing Care research assistants.   The Study of Nursing Care project poses a potential response to academic workforce issues. This article discusses the evolution of the project, its methods and operation and considers its possible implications for contemporary practice. Implications for nursing.  The Study of Nursing Care model demonstrates the clear benefits of fully committed funding, a programmatic approach towards research development, and the importance of selecting the right kind of people for the work, in a national scheme.   The authors argue that although the clinical outcomes it set out to achieve remain elusive, the project produced a cohort of nurse researchers who went on to give important leadership in nursing, including in nursing academia/research. A contemporary version of the Study of Nursing Care has important potential to generate the next generation of nurse researchers, and leaders, into the twenty-first century. © 2012 Blackwell Publishing Ltd.

  17. Project Oasis : A Case Study in Jamaican Development Administration

    NARCIS (Netherlands)

    Gayle, Dennis J.; Drori, Israel D.

    1984-01-01

    This paper is concerned with development administration in practice, at the level of a particular project which was implemented in the Caribbean island of Jamaica in 1979. We are essentially concerned with the problem of the degree of fit between operational project objectives and the management of

  18. Scaling the quality of clinical audit projects: a pilot study.

    Science.gov (United States)

    Millard, A D

    1999-06-01

    To pilot the development of a scale measuring the quality of audit projects through audit project reports. Statements about clinical audit projects were selected from existing instruments, assessing the quality of clinical audit projects, to form a Likert scale. The audit facilitators were based in Scottish health boards and trusts. The participants were audit facilitators known to have over 2 years experience of supporting clinical audit. The response at first test was 11 out of 14 and at the second test it was 27 out of 46. The draft scale was tested by 27 audit facilitators who expressed their strength of agreement or disagreement with each statement for three reports. Validity was assessed by test-re-test, item-total, and total-global indicator correlations. Of the 20 statements, 15 had satisfactory correlations with scale totals. Scale totals had good correlations with global indicators. Test-re-test correlation was modest. The wide range of responses means further research is needed to measure the consistency of audit facilitators' interpretations, perhaps comparing a trained group with an untrained group. There may be a need for a separate scale for reaudits. Educational impact is distinct from project impact generally. It may be more meaningful to treat the selection of projects and aims, methodology and impact separately as subscales and take a project profiling approach rather than attempting to produce a global quality index.

  19. A study for EVMS application to NPP construction project

    Energy Technology Data Exchange (ETDEWEB)

    Roh, M. S.; Kwak, J. K. [KEPCO, Daejeon (Korea, Republic of)

    2016-05-15

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated.

  20. A study for EVMS application to NPP construction project

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.

    2016-01-01

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated

  1. An archival study on the reacting plasma project (R-project) at the institute of plasma physics, Nagoya University. An interview with MATSUURA Kiyokata, professor emeritus at Nagoya University

    Energy Technology Data Exchange (ETDEWEB)

    Terashima, Y [Nagoya Univ., Nagoya, Aichi (Japan); Obayashi, H; Fujita, J; Namba, C; Kimura, K; Matsuoka, K; Hanaoka, S [National Inst. for Fusion Science, Toki, Gifu (Japan)

    2006-01-15

    An interview record with MATSUURA Kiyokata, Professor Emeritus at Nagoya University, is given on the Reacting Plasma Project (R-project), which was proposed and investigated in 1980's by the Institute of Plasma Physics, Nagoya University (IPP Nagoya). The project was planned to aim at producing a DT reacting plasma in tokamak to explore its physics and technology. But after intensive studies on design work, together with some R and D efforts and related investigations, the project could not be realized. The circumstances of the R-Project at its initiation and termination stages are the major topics of the present interview, held as a round-table talk with Prof. Matsuura, the project leader. (author)

  2. Managing uncertainty during r&d projects: a case study

    NARCIS (Netherlands)

    Wouters, Marc; Roorda, Berend; Gal, Ruud

    2011-01-01

    Firms make signifi cant investments in R&D projects, yet the economic return is often diffi cult to predict because of signifi cant technological and commercial uncertainty. We present an innovative and practical method for managing R&D projects, and we discuss its application to a large R&D

  3. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  4. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    Directory of Open Access Journals (Sweden)

    Debadyuti Das

    2017-12-01

    Full Text Available The present work attempts to identify critical success factors (CSFs influencing the performance of development projects based on their key performance indicators (KPIs. It has considered the case of Constituency Development Fund (CDF projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items constituting these six factors represent six CSFs namely project-related, client-related, consultant-related, contractor-related, supply chain-related, and external environment-related factor. The findings are also relevant to development projects undertaken in other developing countries.

  5. Industrially-Situated Project-Based Learning: A Study of Feedback and Diffusion

    Science.gov (United States)

    Gilbuena, Debra M.

    The Virtual Chemical Vapor Deposition (CVD) Process Development Project provides the context for the two areas of the research presented in this dissertation. The first area, generally referred to as feedback in this dissertation, focuses on student learning and the interactions of students and instructors that take place in the project, specifically focused on characterizing feedback and determining the influence of feedback as student teams progress towards completing the project. The characteristics of feedback found in this project are presented within a situative perspective using the analytical framework of episodes. The characteristics include: a list and categorization of episode themes, the structure and flow of episodes during the coaching session, the sub-structure present within individual episodes, and the types of feedback present. This dissertation shows how these characteristics frame participation in a community of practice and can be used as tools to scaffold instructor feedback in project-based learning. Episodes analysis is also used to investigate how feedback on professional skills can help to enculturate students into a community of practice and influence their fluency with professional skills and engagement in more technical activities. The second area examines the spread of this innovative project from its home institution to other institutions. In this area an analysis of the spread of the Virtual CVD Process Development Project in the high school setting is presented. The project was found to provide versatility for instructors and afford student learning in the areas of motivation, cognition, and epistemological beliefs. These two areas inform each other. As the project is assessed at different institutions, it is continually improved and the sensitivity of different aspects of the project is explored, e.g., the aspects of the project that are crucial to maintain effectiveness are identified. One of these aspects is the feedback that

  6. Sustainability in Open Source Software Commons: Lessons Learned from an Empirical Study of SourceForge Projects

    Directory of Open Access Journals (Sweden)

    Charles M. Schweik

    2013-01-01

    Full Text Available In this article, we summarize a five-year US National Science Foundation funded study designed to investigate the factors that lead some open source projects to ongoing collaborative success while many others become abandoned. Our primary interest was to conduct a study that was closely representative of the population of open source software projects in the world, rather than focus on the more-often studied, high-profile successful cases. After building a large database of projects (n=174,333 and implementing a major survey of open source developers (n=1403, we were able to conduct statistical analyses to investigate over forty theoretically-based testable hypotheses. Our data firmly support what we call the conventional theory of open source software, showing that projects start small, and, in successful cases, grow slightly larger in terms of team size. We describe the “virtuous circle” supporting conventional wisdom of open source collaboration that comes out of this analysis, and we discuss two other interesting findings related to developer motivations and how team members find each other. Each of these findings is related to the sustainability of these projects.

  7. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  8. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  9. Analysis model for the physical dimension in the environmental studies of electric transmission projects

    International Nuclear Information System (INIS)

    Garcia Gomez; Maria Aleyda; Caballero Acosta, Humberto

    2001-01-01

    This study makes a description and analysis of the physical aspects of the environment, which are contemplated, in the environmental studies of the projects of high voltage for electric transmission lines. Its meaning and out reach are defined in this projects, in its different phases of implementation; that is in the stages of design, construction and operation, making proposals to improve the adequate incorporation of physical dimension in the environmental activities. A very important aspect, worked out in the investigation, has to do with the way as this dimension is described in the real terms of reference for EIA of the Ministry of Environment; that is why it is analysed and some elements are proposed which are to correct and to articulate properly the information in these studies, because some problems were found in the articulation and contents of the physical aspects in the studies of environmental impact (EIA). Another very important aspect, which was obtained with this research, is the methodological proposal for the integration of the components of the physical dimension in which s ynthesis units are defined in different scales for the integration of those components. These facts will facilitate a better understanding of the natural processes in the areas of influence of the projects and a better understanding of the reciprocal relations between the project and the physical surroundings. In the process of searching a methodology for integration of the components of the physical dimension it is hoped that the studies be more congruent from the environmental point of view

  10. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities

    International Nuclear Information System (INIS)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources

  11. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  12. Assessment of online public opinions on large infrastructure projects: A case study of the Three Gorges Project in China

    International Nuclear Information System (INIS)

    Jiang, Hanchen; Qiang, Maoshan; Lin, Peng

    2016-01-01

    Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework uses web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework.

  13. Assessment of online public opinions on large infrastructure projects: A case study of the Three Gorges Project in China

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, Hanchen, E-mail: jhc13@mails.tsinghua.edu.cn; Qiang, Maoshan, E-mail: qiangms@tsinghua.edu.cn; Lin, Peng, E-mail: celinpe@mail.tsinghua.edu.cn

    2016-11-15

    Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework uses web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework.

  14. Feasibility study of Pridneprovskaya Thermal Power Plant reconstruction project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of saving energy and reducing greenhouse gas emission at the Pridneprovskaya power plant in Ukraine, a scrap and build project has been discussed. This project will abolish the unit No.12 among the eight units in the existing coal burning power generation facilities, and install a natural gas burning combined cycle plant comprising of three units each with an output of 100 MW. The new plant facilities will consist of gas turbines, steam turbines, HRSG and auxiliary devices, and an air-cooled synchronous power generator with a capacity of 119 MVA. Use of natural gas as fuel reduces generation of soot, sulfur oxides, nitrogen oxides, and CO. In addition, the hot effluent and waste liquor effluent will decrease from those at the present plant. The required fund will be 30,107 million yen. The energy saving effect of this project is reduction of about 7.5 million tons of crude oil equivalent as a total in 40 years. The greenhouse effect gas will decrease by about 39 million tons as a total in 40 years. The profitability estimation calls for the number of investment recovery year of 16 years, and internal profit rate of 7.32%, wherein the implementation of the project cannot be expected as a project to be carried out by private funds. (NEDO)

  15. Summary of Session 8 'LHC-related Projects and Studies (I)'

    Energy Technology Data Exchange (ETDEWEB)

    Garoby, R; Ponce, Laurette [European Organization for Nuclear Research, Geneva (Switzerland)

    2012-07-01

    This session was the first of the two sessions dealing with future projects and the associated studies. Starting with descriptions of the plans and needs of the LHCb and ALICE experiments which are less extensively documented than those of ATLAS and CMS, it addressed the plans for the High Luminosity LHC and for the upgrade of the injectors, both for protons and other ions. (author)

  16. Rethinking project portfolio management: A case study of a public organization

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian; Svejvig, Per

    2018-01-01

    analytical perspectives. One perspective, denoted as classical project management (CPM), highlights key characteristics of traditional PPM research. A second perspective, denoted as rethinking project management (RPM), highlights characteristics of progressive PPM research. Against this background, we...... diagnose PPM practices in a large public organization and find that organizational top management use the vocabulary and request the values emphasized by the CPM perspective, such as executability, controllability, instrumentality and linearity. However, below top management level, we find managers...... practices. Taking into account the limitations of our single case study design, our research shows how an organization, which differs considerably from advise provided by the conventional CPM perspective, and best PPM practices, may be well functioning – or at least, in large, meets the organization’ PPM...

  17. Projected shell model study of odd-odd f-p-g shell proton-rich nuclei

    International Nuclear Information System (INIS)

    Palit, R.; Sheikh, J.A.; Sun, Y.; Jain, H.C.

    2003-01-01

    A systematic study of two-quasiparticle bands of the proton-rich odd-odd nuclei in the mass A∼70-80 region is performed using the projected shell model approach. The study includes Br, Rb, and Y isotopes with N=Z+2 and Z+4. We describe the energy spectra and electromagnetic transition strengths in terms of the configuration mixing of the angular-momentum projected multi-quasiparticle states. Signature splitting and signature inversion in the rotational bands are discussed and are shown to be well described. A preliminary study of the odd-odd N=Z nucleus 74 Rb, using the concept of spontaneous symmetry breaking is also presented

  18. Business Value Is not only Dollars : Results from Case Study Research on Agile Software Projects

    NARCIS (Netherlands)

    Racheva, Z.; Daneva, Maia; Sikkel, Nicolaas; Buglione, Luigi; Ali Babar, M.; Vierimaa, Matias; Oivo, Markku

    Business value is a key concept in agile software development. This paper presents results of a case study on how business value and its creation is perceived in the context of agile projects. Our overall conclusion is that the project participants almost never use an explicit and structured

  19. Studies on characteristics of water sources around Kaiga project area

    International Nuclear Information System (INIS)

    Prakash, T.R.; Krishna Bhat, D.; Thimme Gowda, B.; Sherigara, B.S.; Abdul Khadar, A.M.

    1995-01-01

    A systematic and detailed study of characteristics of ground water, Kali river water and rain water samples around Kaiga project area has been undertaken. The analysis of a large number of parameters revealed that the ground waters and Kali river water are of calcium-bicarbonate type as indicated by Romani's modified Hill Piper diagram. The ionic impurities in ground waters and Kali river water are well within the Indian Drinking Water Specifications. The results obtained would serve as base line data for future impact studies. (author). 6 refs., 1 tab

  20. Miniaturized Power Processing Unit Study: A Cubesat Electric Propulsion Technology Enabler Project

    Science.gov (United States)

    Ghassemieh, Shakib M.

    2014-01-01

    This study evaluates High Voltage Power Processing Unit (PPU) technology and driving requirements necessary to enable the Microfluidic Electric Propulsion technology research and development by NASA and university partners. This study provides an overview of the state of the art PPU technology with recommendations for technology demonstration projects and missions for NASA to pursue.

  1. Integrating Forage, Wildlife, Water, and Fish Projections with Timber Projections at the Regional Level: A Case Study in Southern United States

    Science.gov (United States)

    Linda A. Joyce; Curtis H. Flather; Patricia A. Flebbe; Thomas W. Hoekstra; Stan J. Ursic

    1990-01-01

    The impact of timber management and land-use change on forage production, turkey and deer abundance, red-cockaded woodpecker colonies, water yield, and trout abundance was projected as part of a policy study focusing on the southern United States. The multiresource modeling framework used in this study linked extant timber management and land-area policy models with...

  2. Factors Affecting Project Governance Of Arusha Archdiocesan Food Security And Livelihood Project In Monduli District Tanzania.

    Directory of Open Access Journals (Sweden)

    Kisame Deogratious

    2015-06-01

    Full Text Available Abstract This research project dealt with the factors affecting governance of Food security and livelihood projects a case study of the Food security and livelihood project that was implemented by AAIDRO in Monduli district and included 60 respondents all together. The specific objectives of this study intended to access the Leadership styles that are being used in project governance. The findings of the study indicated that 91.7 of the respondents were in favor of their leaders project governance styles it was portrayed that participative leadership style was being used by the leaders for project governance. Based on a sample of 60 project members this study had confirmed that a project leaders leadership roles like mentor facilitator innovator and coordinator are important in influencing project governance effectiveness which includes team mission goal achievement and empowerment open and honest communication

  3. A comparative study on the Environmental Impact Assessment of industrial projects in Malaysia

    Science.gov (United States)

    Marmaya, E. A.; Mahbub, R.

    2018-02-01

    In the past decade, mankind has been manipulating the natural environment to better suit its needs for providing buildings and infrastructure for residential, commercial, business and industrial purposes. The rapid industrialization that has taken place has generated several issues regarding the environment. Therefore, managing environmental risks in construction projects has been recognized as an important process to achieve the project objectives in terms of time, cost, quality, safety and environmental sustainability. The aim of this research is to assess the environmental impact of industrial projects to the surrounding areas. The impact to the environment can be categorized into several aspects such as ecosystem impact, natural resources impact and public impact. This research employs the quantitative approach, that is, a questionnaire survey targeted at the occupants living in the surrounding areas of the case study location, namely the industrial sites in Sabah Ammonia Urea (SAMUR), Sipitang, Sabah and Lynas Advanced Materials Plant (LAMP), Gebeng Pahang. The findings of the research show that the two projects are perceived to have negative environmental impact especially for land pollution and green-house gas emissions.

  4. [The organizational projects management led by head nurses: qualitative study from an educational device.

    Science.gov (United States)

    Dujardin, Pierre-Philippe; Reverdy, Thomas; Valette, Annick; François, Patrice

    2017-09-01

    The work of operational coordination led by head nurses (HN) is more known than their abilities to change work organization, as well as, care practices. In this article, we explore organizational projects led by HN. Depending on the situations, they may concern their health care team or involve institutional hierarchy or other teams. We rely on an intervention study, which enabled us to follow 17 organizational projects led by HN for one year. The results of this study highlight as the main condition for success, the HN' efforts to enable mutual understanding with other interested actors. Managers, who engage their health care team in the development of solutions, bring sustainable results. When problems involve the hierarchy, the managers focus on the development of personal relationships. When problems involve other departments, which they depend on, then they engage themselves into integrative negotiations. These results invite to open discussion about work organization and to formalize organizational projects. This intervention study also points out that work - training at operational audit is relevant for HN. Activé par Editorial Manager® et ProduXion.

  5. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  6. Relationship of creative projects in anatomy to medical student professionalism, test performance and stress: an exploratory study.

    Science.gov (United States)

    Shapiro, Johanna; Nguyen, Vincent P; Mourra, Sarah; Boker, John R; Ross, Marianne; Thai, Trung M; Leonard, Robert J

    2009-11-03

    The anatomy course offers important opportunities to develop professionalism at an early stage in medical education. It is an academically significant course that also engenders stress in some students. Over a three-year period, 115 of 297 students completed creative projects. Thirty-four project completers and 47 non-completers consented to participate in the study. Projects were analyzed for professionalism themes using grounded theory. A subset of project completers and non-completers were interviewed to determine their views about the stress of anatomy and medical school, as well as the value of the creative projects. We also compared test performance of project completers and non-completers. Projects completed early in the course often expressed ambivalence about anatomy, whereas later projects showed more gratitude and sense of awe. Project completers tended to report greater stress than noncompleters, but stated that doing projects reduced stress and caused them to develop a richer appreciation for anatomy and medicine. Project completers performed significantly lower than non-completers on the first written exam (pre-project). Differences between groups on individual exams after both the first and second creative project were nonsignificant. For some students, creative projects may offer a useful way of reflecting on various aspects of professionalism while helping them to manage stress.

  7. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  8. What is ′Successful Development′ in Conservation and Development Projects? Insights from Two Nicaraguan Case Studies

    Directory of Open Access Journals (Sweden)

    Sandra K Znajda

    2014-01-01

    Full Text Available The lack of clear indications of success in integrated conservation and development projects has resulted in strong criticisms of these projects, and a call for the return to conservation activities that exclude local communities. Impeding this discussion is the lack of clarity around how project success is defined and measured in conservation and development projects, especially in terms of development goals. This study involved an in-depth exploration of two agroforestry-focused conservation and development projects in Nicaragua to provide insights into how success in reaching development goals is interpreted in such projects. In both projects, development was equated with increased household income, in contrast to more contemporary definitions that include aspects such as self-respect and social integration. Both projects in turn relied on income as a measure of development success, which ultimately lessened attention to impacts not easily measured quantitatively as well as participant perspectives on desired goals. The paper concludes with a discussion of implications for conservation practitioners; specifically the need for better alignment of project goals with contemporary explanations of development, and a need to move beyond primarily numerical indicators to measure change through an interdisciplinary approach in order to have a more comprehensive understanding of project impacts.

  9. Impact of choice of future climate change projection on growth chamber experimental outcomes: a preliminary study in potato

    Science.gov (United States)

    Leisner, Courtney P.; Wood, Joshua C.; Vaillancourt, Brieanne; Tang, Ying; Douches, Dave S.; Robin Buell, C.; Winkler, Julie A.

    2017-11-01

    Understanding the impacts of climate change on agriculture is essential to ensure adequate future food production. Controlled growth experiments provide an effective tool for assessing the complex effects of climate change. However, a review of the use of climate projections in 57 previously published controlled growth studies found that none considered within-season variations in projected future temperature change, and few considered regional differences in future warming. A fixed, often arbitrary, temperature perturbation typically was applied for the entire growing season. This study investigates the utility of employing more complex climate change scenarios in growth chamber experiments. A case study in potato was performed using three dynamically downscaled climate change projections for the mid-twenty-first century that differ in terms of the timing during the growing season of the largest projected temperature changes. The climate projections were used in growth chamber experiments for four elite potato cultivars commonly planted in Michigan's major potato growing region. The choice of climate projection had a significant influence on the sign and magnitude of the projected changes in aboveground biomass and total tuber count, whereas all projections suggested an increase in total tuber weight and a decrease in specific gravity, a key market quality trait for potato, by mid-century. These results demonstrate that the use of more complex climate projections that extend beyond a simple incremental change can provide additional insights into the future impacts of climate change on crop production and the accompanying uncertainty.

  10. A Case Study of Horizontal Reuse in a Project-Driven Organisation

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak; Røn, Henrik

    2000-01-01

    This experience paper presents observations, lessons learned, and recommendations based on a case study of reuse. The case study is concerned with the development, maturation, and reuse of a business domain independent software component (horizontal reuse) in a project-driven organisation that has...... knowledge is transferred within an organisation; (c) design patterns can be as risky as they can be beneficial; and (d) there is more to architectural mismatch than “merely ” packaging mismatch....

  11. Study of Kvanefjeld uranium project for the Ministry for Greenland. Vol. 2

    International Nuclear Information System (INIS)

    1977-01-01

    Appendices to volume 1 of the report 'Study of Kvanefjeld uranium project for the Ministry for Greenland'. Calculation sheets and prints dealing with material and energy balance, and estimate of leaching, extraction, pelleting, and many other technological processes. (EG)

  12. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  13. A study of the Bienstock-Zuckerberg algorithm, Applications in Mining and Resource Constrained Project Scheduling

    OpenAIRE

    Muñoz, Gonzalo; Espinoza, Daniel; Goycoolea, Marcos; Moreno, Eduardo; Queyranne, Maurice; Rivera, Orlando

    2016-01-01

    We study a Lagrangian decomposition algorithm recently proposed by Dan Bienstock and Mark Zuckerberg for solving the LP relaxation of a class of open pit mine project scheduling problems. In this study we show that the Bienstock-Zuckerberg (BZ) algorithm can be used to solve LP relaxations corresponding to a much broader class of scheduling problems, including the well-known Resource Constrained Project Scheduling Problem (RCPSP), and multi-modal variants of the RCPSP that consider batch proc...

  14. Pre-project study on a demonstration plant for seawater desalination using a nuclear heating reactor in Morocco

    International Nuclear Information System (INIS)

    Achour, M.

    2000-01-01

    This paper gives in the first part detailed information on the pre-project study on a demonstration plant for seawater desalination using heating reactor implemented by both Moroccan and Chinese sides. The main findings of the pre-project study are given in the second part. (author)

  15. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  16. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    Science.gov (United States)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  17. The project De Caldas International Project: An example of a large-scale radwaste isolation natural analogue study

    International Nuclear Information System (INIS)

    Shea, M.

    1995-01-01

    The proper isolation of radioactive waste is one of today's most pressing environmental issues. Research is being carried out by many countries around the world in order to answer critical and perplexing questions regarding the safe disposal of radioactive waste. Natural analogue studies are an increasingly important facet of this international research effort. The Pocos de Caldas Project represents a major effort of the international technical and scientific community towards addressing one of modern civilization's most critical environmental issues - radioactive waste isolation

  18. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  19. The Study on Stage Financing Model of IT Project Investment

    Directory of Open Access Journals (Sweden)

    Si-hua Chen

    2014-01-01

    Full Text Available Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model.

  20. The Study on Stage Financing Model of IT Project Investment

    Science.gov (United States)

    Xu, Sheng-hua; Xiong, Neal N.

    2014-01-01

    Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model. PMID:25147845

  1. The study on stage financing model of IT project investment.

    Science.gov (United States)

    Chen, Si-hua; Xu, Sheng-hua; Lee, Changhoon; Xiong, Neal N; He, Wei

    2014-01-01

    Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model.

  2. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  3. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Science.gov (United States)

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  4. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  5. The Generalizability of Private Sector Research on Software Project Management in Two USAF Organizations: An Exploratory Study

    National Research Council Canada - National Science Library

    Garman, Michael

    2003-01-01

    ... budget. However, software projects frequently fail to meet these criteria. Software engineers, acquisition officers, and project managers have all studied this issue and made recommendations for achieving success...

  6. Analyzing Drivers of Conflict in Energy Infrastructure Projects: Empirical Case Study of Natural Gas Pipeline Sectors

    Directory of Open Access Journals (Sweden)

    Chan Young Park

    2017-11-01

    Full Text Available Energy infrastructure projects have caused various conflicts between stakeholders, particularly among the residents around construction sites and operators. The conflicts are largely due to the “Not in My Backyard” mentality associated with hazardous projects. In natural gas pipeline (NGP projects, conflicts have been increasing with the increase in a wider range of linear projects, and they have been worsening because of the lack of clear countermeasures. This study proposes an effective conflict management strategy for NGP projects in Korea. To achieve the objectives, 25 conflict drivers were identified and 143 case-based surveys were conducted to determine the causal relationship between the drivers and the level of conflict using structural equation modeling (SEM. The SEM results show that factors such as economic (e.g., decreased value of the land, construction-related (e.g., disturbance due to using the original route and site, and safety-related characteristics (e.g., concerns about explosions and accidents are the most important in understanding the causes of conflicts. Based on the causal relationship, five key strategies were proposed to manage the critical conflicts. This study can serve as a basis for implementing better conflict management plans in the future for a more sustainable project execution.

  7. Case Studies in Application of System Engineering Practices to Capstone Projects

    Science.gov (United States)

    Murphy, Gloria; vanSusante, Paul; Carmen, Christina; Morris, Tommy; Schmidt, Peter; Zalewski, Janusz

    2011-01-01

    The Exploration Systems Mission Directorate (ESMD) of the National Aeronautics and Space Administration (NASA) sponsors a faculty fellowship program that engages researchers with interests aligned with current ESMD development programs. The faculty-members are committed to run a capstone senior design project based- on the materials and experience gained during the fellowship. For the 2010 - 2011 academic year, 5 projects were approved. These projects are in the areas of mechanical and electrical hardware design and optimization, fault prediction and extra planetary civil site preparation. This work summarizes the projects, describes the student teams performing the work, and comments on the integration of Systems Engineering principles into the projects, as well as the affected course curriculums.

  8. Study on Applicability of 10 CFR Part 21 to APR1400 DC Project

    International Nuclear Information System (INIS)

    Shin, He Young; Lee, Do Hwan; Lim, Jae Yong

    2014-01-01

    The tools such as NCR (non conformance report), CAR (corrective action request) and CAP (corrective action program) are widely used for that purpose based upon the rule of 10 CFR Part 50 Appendix B and the ASME Code NQA-1 requirements. These are the tools for a utility, as a purchaser taking over related basic components and services, to ensure strong quality assurance. During the conduct of the project for the acquisition of the standard design certification for APR1400 nuclear power plants from the U. S. NRC (APR1400 DC Project), a new CAP procedure that is appropriate to conduct this unique project was developed. However, it was also recommended to comply with the requirements under 10 CFR Part 21 which enhances nuclear safety quality assurances. Consequently, a new QA procedure is developed in order to deal with the 10 CFR Part 21 issues and this is integrated to the CAP procedure In this paper, the current corrective action program for the APR1400 DC project is introduced and the result of the study on the applicability of 10 CFR Part 21 to the project is indicated. In addition, further improving aspects to be considered are identified. As a frontier project to obtain the standard design certification for APR 1400 model from the U. S. NRC, a modified CAP procedure is developed and enhanced to deal with safety concerning issues in accordance with 10 CFR Part 21. In addition, the newly established QA procedure to directly control the reportability on 10 CFR Part 21 is interfaced into the existing CAP procedure

  9. A Study on Project Duration Incentives in a Retail Apparel Franchise

    Directory of Open Access Journals (Sweden)

    Yichen Peng

    2015-02-01

    Full Text Available This paper studies the impact on project duration of different forms of over-confidence among general contractors executing such projects, in the context of retail apparel franchises. It goes on to consider the design of relevant incentives and, in particular, a compensation mechanism included in the initial contract that covers the event of contractor dismissal. This mechanism is examined as a means of hedging risk arising from the behavior of the principal. This includes a study of a two-way risk avoidance strategy, which is intended to make up for a shortfall in this regard in the existing literature. Outcomes derived from this research include the conclusion that different levels of confidence can have various impacts on optimal incentive coefficients and the effort level extracted from agents, thereby affecting the ultimate configuration of an optimal contract. Introducing a compensation mechanism covering the event of dismissal can serve to diminish the risk of an agent breaching their contract. This paper applies the concept of bounded rationality to a principal-agent model, ensuring conclusions that are attuned to reality.

  10. Subseabed Disposal Project annual report, FY85 to termination of project: Physical Oceanography and Water Column Geochemistry Studies, October 1984 through May 1986

    Energy Technology Data Exchange (ETDEWEB)

    Kupferman, S.L. (ed.)

    1987-05-01

    This report covers the work of the Physical Oceanography and Water Column Geochemistry (POWCG) Studies Group of the Subseabed Disposal Project (SDP) from October 1984 to termination of the project in May 1986. The overview of the work includes an introduction, general descriptions of the activities, and a summary. Detailed discussions are included as appendices. During the period of this report the POWCG Studies Group held a meeting to develop a long-term research plan for the Nares Abyssal Plain, which was recently designated as a study area for the Environmental Study Group of the SDP. The POWCG Studies Group has also planned and participated in two interdisciplinary oceanographic missions to the Nares which have resulted in the acquisition of data and samples which can be used to begin to understand the workings of the ecosystem at the site, and for developing a preliminary site assessment. The papers in the appendices have been processed for inclusion in the Energy Data Base.

  11. Subseabed Disposal Project annual report, FY85 to termination of project: Physical Oceanography and Water Column Geochemistry Studies, October 1984 through May 1986

    International Nuclear Information System (INIS)

    Kupferman, S.L.

    1987-05-01

    This report covers the work of the Physical Oceanography and Water Column Geochemistry (POWCG) Studies Group of the Subseabed Disposal Project (SDP) from October 1984 to termination of the project in May 1986. The overview of the work includes an introduction, general descriptions of the activities, and a summary. Detailed discussions are included as appendices. During the period of this report the POWCG Studies Group held a meeting to develop a long-term research plan for the Nares Abyssal Plain, which was recently designated as a study area for the Environmental Study Group of the SDP. The POWCG Studies Group has also planned and participated in two interdisciplinary oceanographic missions to the Nares which have resulted in the acquisition of data and samples which can be used to begin to understand the workings of the ecosystem at the site, and for developing a preliminary site assessment. The papers in the appendices have been processed for inclusion in the Energy Data Base

  12. Storytelling Practices in Project Management : Exploratory study in new business process implementation in Information and Communication Technology projects

    OpenAIRE

    Abdubaliev, Ulukbek; Akysheva, Aizhan

    2017-01-01

    Stories have always been present in the life of people as a part of their culture, it is a rather ancient narrative technique. The message delivered in a form of a story is specifically appealing to listeners, which makes it a powerful communication tool. The thesis explores storytelling practices in project management by answering the question: “How project managers use storytelling in new business process implementation in ICT projects?” The choice of the topic was driven by the gap in the ...

  13. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  14. Relationship of creative projects in anatomy to medical student professionalism, test performance and stress: an exploratory study

    Directory of Open Access Journals (Sweden)

    Thai Trung M

    2009-11-01

    Full Text Available Abstract Background The anatomy course offers important opportunities to develop professionalism at an early stage in medical education. It is an academically significant course that also engenders stress in some students. Methods Over a three-year period, 115 of 297 students completed creative projects. Thirty-four project completers and 47 non-completers consented to participate in the study. Projects were analyzed for professionalism themes using grounded theory. A subset of project completers and non-completers were interviewed to determine their views about the stress of anatomy and medical school, as well as the value of the creative projects. We also compared test performance of project completers and non-completers. Results Projects completed early in the course often expressed ambivalence about anatomy, whereas later projects showed more gratitude and sense of awe. Project completers tended to report greater stress than noncompleters, but stated that doing projects reduced stress and caused them to develop a richer appreciation for anatomy and medicine. Project completers performed significantly lower than non-completers on the first written exam (pre-project. Differences between groups on individual exams after both the first and second creative project were nonsignificant. Conclusion For some students, creative projects may offer a useful way of reflecting on various aspects of professionalism while helping them to manage stress.

  15. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  16. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  17. From field studies to risk management: the Sensib project

    International Nuclear Information System (INIS)

    Mercat-Rommens, C.; Renaud, P.

    2004-01-01

    The consequences for the man and the environment of the discharges of nuclear facilities depend on the importance and the nature of the discharges, but also on the environment which receives them. Thus, the impact of a pollution, which is expressed in term of toxicity, risk or economic consequences, varies according to the characteristics of the environment and the use of this environment by the man. The radioecological sensitivity can be defined as the response of the environment to a radioactive pollution. This response is expressed through various indicators: the activity of a radionuclide at a precise moment, a stock of radionuclide in a given environmental compartment or a flux of radionuclide... For a determined discharge, the higher is the response, the more sensitive is the environment. If all the ecosystems appear sensitive, their sensitivity does not concern the same criteria and it is currently difficult to compare these criteria between them; is it more hazardous to have a stock of radioactivity present in a natural space or to have an important but time-limited concentration of radionuclides in a river used for irrigation? The idea of the SENSIB project is to create a standardized tool which makes it possible to represent and to compare with the same scale the sensitivity of various ecosystems. The sensitivity indexes, which will be developed during the project, aim to represent the intensity of the environmental response. These indicators, which are the result of the transfer of the radionuclides in the environment, depend on various intrinsic parameters of the ecosystems (climate, soil, agricultural practises...). The SENSIB project, based on results of field studies conducted by IRSN, aims to develop both a methodology to calculate sensitivity indexes and a radioecological sensitivity scale usable for risk management. (author)

  18. Study of geological details towards feasibility of uranium project: Indian case studies

    International Nuclear Information System (INIS)

    Sarangi, A.

    2014-01-01

    Appropriate technical evaluation of geological details at early stage of exploration is the key to minimising the lead-time between discovery and production. This has a major influence on economic viability of the deposits. Indian uranium deposits are of medium-tonnage and low-grade occurring in dissimilar geological provinces. Detailed studies of geological characteristics of these deposits are very vital to the proper selection of technology and subsequent successful operation. The method of mining (underground/open pit/in-situ recovery) is influenced by the ore body depth, size, grade, configuration, hostrock and adjoining strata characteristics, hydrological condition etc. The ore processing technology is also subjective to mineralogical characteristics of the ore. In order to draw the flowsheet, determine process parameters and selection of reagents, a comprehensive study on identification of minerals and their probable metallurgical characteristics, general physical relationship between various minerals, mineral liberation size etc is of great significance. The technology for disposal of tailings is also influenced by geological/geo-hydrological characteristics. The key to successful operation of Indian uranium deposits lies in outlining a pre-development strategy as the exploration advances to different stages. This phase called ''exploratory mining'' - which starts with detailed exploration and ends with approval of the project is very critical for early commissioning of the project. The activities during this period include collection of representative drill core samples during exploration, laboratory studies, geo-technical studies and determination of geomechanical properties of ore and waste rock etc. Later, the ore lenses are accessed through limited entry(ies). Developments along the ore body helps in better understanding of the configuration of the lenses. Studies for strata control in case of underground mining are carried out towards deciding the

  19. Decision models in explorative and exploitative innovation projects: a case study

    NARCIS (Netherlands)

    Wolbers, Michiel; Hofman, Erwin; Halman, Johannes I.M.

    2013-01-01

    Innovation processes are seen as collections of decisions that are made in the context of a single innovation project. Those decisions determine the course and the final success of an innovation project. There is, however, a lack of literature on how decisions are made in innovation projects. In

  20. Assessment of Project Website Sustainability: Case of the Arctic EIA Project

    Directory of Open Access Journals (Sweden)

    Sonja H Bickford

    2016-07-01

    Full Text Available In many cases, temporary websites may be simple, accessible solutions for knowledge management and dissemination of information. However, such sites may become outdated as the funding ends, but yet in many cases, still publicly available through the Internet. The issue of website sustainability is a relevant topic for all organizations that have websites. Website lifecycle, knowledge management, and website sustainability issues are discussed through a theoretical-based literature review. These issues are then summarized and used as lessons learned for the case study approach of this paper. The aim is to identify a solution to address a website’s life and longevity, post project. A practical case study assessment of the issue of project website sustainability is needed to address the website’s longevity—post project—as creation is often made through temporary endeavors. Recommendations for future project websites are made as the outcomes and results of this study and are expressed in the form of suggested practices for project website sustainability in future projects.

  1. A Study on the Efficacy of Project-Based Learning Approach on Social Studies Education: Conceptual Achievement and Academic Motivation

    Science.gov (United States)

    Ilter, Ilhan

    2014-01-01

    In this research, an experimental study was carried out in social studies 4th grade students to develop students' conceptual achievement and motivation to succeed academically. The study aims to investigate the effectiveness of project-based learning (PBL) in social studies. A quasi-experimental research design (pre- and posttest) was used in the…

  2. The wind forecasting improvement project. Description and results from the Southern study region

    Energy Technology Data Exchange (ETDEWEB)

    Freedman, Jeffrey [AWS Truepower LLC, Albany, NY (United States); Benjamin, Stan; Wilczak, James [National Oceanic and Atmospheric Administration, Washington, DC and Boulder, CO (United States)] [and others

    2012-07-01

    The Wind Forecasting Improvement Project (WFIP) is a multi-year U.S. Department of Energy (DOE)/National Oceanographic and Atmospheric Administration (NOAA) sponsored study whose main purpose is to demonstrate the scientific and economic benefits of additional atmospheric observations and model enhancements on wind energy production forecasts. WFIP covers two geographical regions of the U.S.: (1) the upper Great Plains, or Northern Study Area, and (2) most of Texas-the Southern Study Area. The Southern campaign is being led by AWS Truepower LLC, and includes a team of private, government, and academic partners with collective experience and expertise in all facets required to ensure a successful completion of the project. In addition presenting a summary of the state-of-the-art forecasting techniques used and phenomena-based analysis mentioned above, a brief synopsis of how ''lessons learned'' from the WFIP Southern Study Area can be articulated and applied to other wind resource regions will be described. (orig.)

  3. Nuclear Criticality Technology and Safety Project parameter study database

    International Nuclear Information System (INIS)

    Toffer, H.; Erickson, D.G.; Samuel, T.J.; Pearson, J.S.

    1993-03-01

    A computerized, knowledge-screened, comprehensive database of the nuclear criticality safety documentation has been assembled as part of the Nuclear Criticality Technology and Safety (NCTS) Project. The database is focused on nuclear criticality parameter studies. The database has been computerized using dBASE III Plus and can be used on a personal computer or a workstation. More than 1300 documents have been reviewed by nuclear criticality specialists over the last 5 years to produce over 800 database entries. Nuclear criticality specialists will be able to access the database and retrieve information about topical parameter studies, authors, and chronology. The database places the accumulated knowledge in the nuclear criticality area over the last 50 years at the fingertips of a criticality analyst

  4. The Llama Project.

    Science.gov (United States)

    Ganzel, Candy; Stuglik, Jan

    2003-01-01

    At a suburban Indiana elementary school, the Project Approach serves as the basis of the curriculum in all Kindergarten classrooms. The four classes of 5- and 6-year-old children at this school chose to study llamas. This article discusses how the project evolved, describes the three phases of the project, and provides teachers' reflections on the…

  5. How to communicate safety? Some reflections from European project studies

    International Nuclear Information System (INIS)

    Richardson, Philip; Galson, Daniel

    2009-12-01

    Attempts to site geological disposal facilities for radioactive waste - and associated public reactions - indicate that communicating safety and demonstrating safety are very different things. The three different approaches to stakeholder engagement undertaken in the context of the PAMINA, ARGONA and CIP projects have provided valuable insights into how risk communication processes and tools can be improved. The approaches used in these projects all involve the participation of interested stakeholders in identifying concerns and issues, which are then examined in a co-operative fashion between stakeholders and developers acting in partnership. Such approaches offer avenues for dialogue and confidence building where such channels were previously not well developed, Full results from the projects will be available in late 2009 for PAMINA and ARGONA and in early 2010 for CIP. The comments and interim insights outlined here will be developed further and incorporated in the overall project outputs, and help inform developing European policy in this area. It is already clear, however, that the approaches used in these projects offer great promise in helping to develop the trust in the institutions and organisations involved that is essential in gaining support and acceptance for the waste management activities now underway across Europe

  6. The Case Study as Research Heuristic: Lessons from the R&D Value Mapping Project.

    Science.gov (United States)

    Bozeman, Barry; Klein, Hans K.

    1999-01-01

    Examines the role of prototype case studies as the foundation for later evaluation through two studies from the "R&D Value Mapping Project," a study that will involve more than 30 cases. Explores the usefulness of case studies in defining and assessing subsequent research efforts. (SLD)

  7. Economic efficiency of brownfield regeneration: study of South Moravian projects

    Directory of Open Access Journals (Sweden)

    Jana Korytárová

    2017-06-01

    Full Text Available The objective of brownfield regeneration is to increase the attractiveness and value of individual sites to a level where they can compete directly with the construction of a greenfi eld project. The aim of this paper is to examine the economic efficiency of brownfield regeneration. By using CBA outputs, the contribution of socio-economic efficiency to the total efficiency of individual projects based on EBCR was investigated on the basis of a sample of 14 projects located in the South Moravian Region. Furthermore, the expected value of EBCR was simulated by using the Monte Carlo method. The results reveal that socio-economic efficiency contributes significantly to the overall efficiency of these projects and therefore cannot be neglected during their evaluation. At the end of the paper, future research directions in this area are outlined.

  8. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    Science.gov (United States)

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  9. MATRIX MANAGEMENT OF PROJECTS AND POWER STRUGGLES - A CASE-STUDY OF AN RESEARCH-AND-DEVELOPMENT LABORATORY

    NARCIS (Netherlands)

    DELAAT, PB

    Matrix management of projects, it is argued, may generate normative conflict, prompting project and functional managers to engage in nonconformist conflict behavior which challenges the division of authority in matrix. An analysis of such struggles has been lacking yet. The present study fills this

  10. Livingston Parish Landfill Methane Recovery Project (Feasibility Study)

    Energy Technology Data Exchange (ETDEWEB)

    White, Steven

    2012-11-15

    The Woodside Landfill is owned by Livingston Parish, Louisiana and is operated under contract by Waste Management of Louisiana LLC. This public owner/private operator partnership is commonplace in the solid waste industry today. The landfill has been in operation since approximately 1988 and has a permitted capacity of approximately 41 million cubic yards. Based on an assumed in-place waste density of 0.94 ton per cubic yard, the landfill could have an expected design capacity of 39.3 million tons. The landfill does have an active landfill gas collection and control system (LFGCCS) in place because it meets the minimum thresholds for the New Source Performance Standards (NSPS). The initial LFGCS was installed prior to 2006 and subsequent phases were installed in 2007 and 2010. The Parish received a grant from the United States Department of Energy in 2009 to evaluate the potential for landfill gas recovery and utilization at the Woodside Landfill. This includes a technical and economic feasibility study of a project to install a landfill gas to energy (LFGTE) plant and to compare alternative technologies. The LFGTE plant can take the form of on-site electrical generation, a direct use/medium Btu option, or a high-Btu upgrade technology. The technical evaluation in Section 2 of this report concludes that landfill gas from the Woodside landfill is suitable for recovery and utilization. The financial evaluations in sections 3, 4, and 5 of this report provide financial estimates of the returns for various utilization technologies. The report concludes that the most economically viable project is the Electricity Generation option, subject to the Parish’s ability and willingness to allocate adequate cash for initial capital and/or to obtain debt financing. However, even this option does not present a solid return: by our estimates, there is a 19 year simple payback on the electricity generation option. All of the energy recovery options discussed in this report

  11. A Project Management Approach to M&A Deals and their Post-Integration Projects : A Case Study

    OpenAIRE

    Habibbeigi, Pooria

    2010-01-01

    Mergers and acquisitions (M&A) projects have long been considered as a strategy for organizational growth and gain of market share. Top management teams of companies take M&As into consideration since it is faster and less costly compare to internal growth and development programs. M&A project has variety of benefits such as growth in market share, increase in shareholder wealth, access to new markets, technological advantages and so on and so forth. Another benefit of such projec...

  12. Analyzing the contributions of a government-commissioned research project: A case study

    NARCIS (Netherlands)

    Hegger, I.; Janssen, S.W.J.; Keijsers, J.F.E.M.; Schuit, A.J.; Oers, H.A.M. van

    2014-01-01

    Background: It often remains unclear to investigators how their research contributes to the work of the commissioner. We initiated the 'Risk Model' case study to gain insight into how a Dutch National Institute for Public Health and the Environment (RIVM) project and its knowledge products

  13. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  14. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  15. A Study on Evaluation of the Biology Projects Submitted to the TUBITAK Secondary Education Research Projects Contest from the Bursa Region

    Science.gov (United States)

    Zeren Özer, Dilek; Güngör, Sema Nur; Özkan, Muhlis

    2015-01-01

    This study evaluates, through the employment of scientific methods and techniques, a total of 107 Biology projects submitted by secondary education students to the Bursa Region Coordinatorship of TUBITAK (a region which encompasses the municipalities of Afyonkarahisar, Balikesir, Bilecik, Canakkale, Eskisehir, Kutahya, and Yalova). The projects…

  16. The use of public participation and economic appraisal for public involvement in large-scale hydropower projects: Case study of the Nam Theun 2 Hydropower Project

    International Nuclear Information System (INIS)

    Mirumachi, Naho; Torriti, Jacopo

    2012-01-01

    Gaining public acceptance is one of the main issues with large-scale low-carbon projects such as hydropower development. It has been recommended by the World Commission on Dams that to gain public acceptance, public involvement is necessary in the decision-making process (). As financially-significant actors in the planning and implementation of large-scale hydropower projects in developing country contexts, the paper examines the ways in which public involvement may be influenced by international financial institutions. Using the case study of the Nam Theun 2 Hydropower Project in Laos, the paper analyses how public involvement facilitated by the Asian Development Bank had a bearing on procedural and distributional justice. The paper analyses the extent of public participation and the assessment of full social and environmental costs of the project in the Cost-Benefit Analysis conducted during the project appraisal stage. It is argued that while efforts were made to involve the public, there were several factors that influenced procedural and distributional justice: the late contribution of the Asian Development Bank in the project appraisal stage; and the issue of non-market values and discount rate to calculate the full social and environmental costs. - Highlights: ► Public acceptance in large-scale hydropower projects is examined. ► Both procedural and distributional justice are important for public acceptance. ► International Financial Institutions can influence the level of public involvement. ► Public involvement benefits consideration of non-market values and discount rates.

  17. The Canada Goose Project: A First Project with Children under 3

    Science.gov (United States)

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  18. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  19. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    OpenAIRE

    Debadyuti Das; Christopher Ngacho

    2017-01-01

    The present work attempts to identify critical success factors (CSFs) influencing the performance of development projects based on their key performance indicators (KPIs). It has considered the case of Constituency Development Fund (CDF) projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items co...

  20. Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida

    Energy Technology Data Exchange (ETDEWEB)

    Vinick, Charles; Riccobono, Antonino, MS; Messing, Charles G., Ph.D.; Walker, Brian K., Ph.D.; Reed, John K., Ph.D.

    2012-02-28

    Dehlsen Associates, LLC was awarded a grant by the United States Department of Energy (DOE) Golden Field Office for a project titled 'Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida,' corresponding to DOE Grant Award Number DE-EE0002655 resulting from DOE funding Opportunity Announcement Number DE-FOA-0000069 for Topic Area 2, and it is referred to herein as 'the project.' The purpose of the project was to enhance the certainty of the survey requirements and regulatory review processes for the purpose of reducing the time, efforts, and costs associated with initial siting efforts of marine and hydrokinetic energy conversion facilities that may be proposed in the Atlantic Ocean offshore Southeast Florida. To secure early input from agencies, protocols were developed for collecting baseline geophysical information and benthic habitat data that can be used by project developers and regulators to make decisions early in the process of determining project location (i.e., the siting process) that avoid or minimize adverse impacts to sensitive marine benthic habitat. It is presumed that such an approach will help facilitate the licensing process for hydrokinetic and other ocean renewable energy projects within the study area and will assist in clarifying the baseline environmental data requirements described in the U.S. Department of the Interior Bureau of Ocean Energy Management, Regulation and Enforcement (formerly Minerals Management Service) final regulations on offshore renewable energy (30 Code of Federal Regulations 285, published April 29, 2009). Because projects generally seek to avoid or minimize impacts to sensitive marine habitats, it was not the intent of this project to investigate areas that did not appear suitable for the siting of ocean renewable energy projects. Rather, a two-tiered approach was designed with the first step consisting of gaining overall insight

  1. Do project management and network governance contribute to inter-organisational collaboration in primary care? A mixed methods study.

    Science.gov (United States)

    Schepman, Sanneke; Valentijn, Pim; Bruijnzeels, Marc; Maaijen, Marlies; de Bakker, Dinny; Batenburg, Ronald; de Bont, Antoinette

    2018-06-07

    The need for organisational development in primary care has increased as it is accepted as a means of curbing rising costs and responding to demographic transitions. It is only within such inter-organisational networks that small-scale practices can offer treatment to complex patients and continuity of care. The aim of this paper is to explore, through the experience of professionals and patients, whether, and how, project management and network governance can improve the outcomes of projects which promote inter-organisational collaboration in primary care. This paper describes a study of projects aimed at improving inter-organisational collaboration in Dutch primary care. The projects' success in project management and network governance was monitored by interviewing project leaders and board members on the one hand, and improvement in the collaboration by surveying professionals and patients on the other. Both qualitative and quantitative methods were applied to assess the projects. These were analysed, finally, using multi-level models in order to account for the variation in the projects, professionals and patients. Successful network governance was associated positively with the professionals' satisfaction with the collaboration; but not with improvements in the quality of care as experienced by patients. Neither patients nor professionals perceived successful project management as associated with the outcomes of the collaboration projects. This study shows that network governance in particular makes a difference to the outcomes of inter-organisational collaboration in primary care. However, project management is not a predictor for successful inter-organisational collaboration in primary care.

  2. Analyzing the contributions of a government-commissioned research project : A case study

    NARCIS (Netherlands)

    Hegger, I.; Janssen, S.W.J.; Keijsers, J.F.E.M.; Schuit, A.J.; van Oers, J.A.M.

    2014-01-01

    Background It often remains unclear to investigators how their research contributes to the work of the commissioner. We initiated the ‘Risk Model’ case study to gain insight into how a Dutch National Institute for Public Health and the Environment (RIVM) project and its knowledge products contribute

  3. Project Stakeholder Management: A Case Study of a Brazilian Science Park

    Directory of Open Access Journals (Sweden)

    Antônio Carlos Pacagnella Júnior

    2015-07-01

    Full Text Available The stakeholder management has been a topic increasingly discussed in the literature about project management, though still existing, large gaps to be filled, especially in complex projects such as the implementation of science parks. Thus, in this paper is presented a case of a Brazilian Science Park which shows how the management team of the project identified key stakeholders and established strategies for engagement and collaboration that sought to increase their engagement, get resources and make use of specific capabilities that were required during the lifecycle of the project to the reaching of its goals.

  4. Overview of the NKS/RAK-1 project 'Strategies for reactor safety' and linkages to piping reliability studies

    International Nuclear Information System (INIS)

    Andersson, Kjell

    1997-01-01

    The NKS/RAK-1 project forms part of a four-year research program (1994-97) in the Nordic countries. The general objective of NKS/RAK-1 project is to explore strategies for reactor safety: to investigate and evaluate the safety work, to increase realism and reliability of safety analysis; and to increase the safety of nuclear installations in selected areas. The project has done extensive interview work at utilities and authorities, and analysed a number of case studies. Brief highlights and overviews of the sub-projects are presented in this paper

  5. Core Abilities Evaluation Index System Exploration and Empirical Study on Distributed PV-Generation Projects

    Directory of Open Access Journals (Sweden)

    Lin He

    2017-12-01

    Full Text Available In line with the constraints of environmental problems and economic development, large-scale renewable-generation projects have been planned and constructed in recent years. In order to achieve sustainable power development and improve the power supply structure, China’s government has focused on distributed photovoltaic (PV generation projects due to their advantages of clean emission and local consumption. However, their unstable output power still brings a series of problems concerning reliability, investment income, and available substitution proportion to traditional power, and so on. Therefore, it is imperative to understand the competitive development abilities of distributed PV generation projects and measure them effectively. First, through various investigation methods such as literature reviews, feasibility report analysis and expert interviews, the factors that influence the core abilities of distributed PV-generation projects were explored based on the micro-grid structure. Then, with the indexed exploration results, the factors were classified into 6 dimensions, i.e., investment and earning ability, production and operation ability, power-grid coordination ability, energy-conservation and emission-reduction ability, sustainable development ability, and society-serving ability. Meanwhile, an evaluation index system for core abilities of distributed PV-generation project was constructed using all quantitative indicators. Third, for examining the availability of the evaluation index system, combination weighting and techniques for order preference by similarity to an ideal solution (TOPSIS methods were adopted to assess the practical distributed PV-generation projects. The case study results showed that installed capacity, local economy development, and grid-connected power quantity will influence the core abilities of distributed PV-generation project, obviously. The conclusions of the evaluation analysis on core abilities can

  6. The Role of the National and University Library of Slovenia in a Multinational Research Project (IMPACT: a Case Study

    Directory of Open Access Journals (Sweden)

    Ines Vodopivec

    2012-04-01

    Full Text Available In this paper, the participation and the role of individual libraries acting as partners in research project consortia, dealing with digitisation issues are analysed, following the example of the National and University Library of Slovenia (NUK as a partner in the IMPACT project — Improving Access to Text. IMPACT is funded under the Seventh Framework Programme of the European Commission (FP7 aimed at improving automated text recognition of digitised materials from different European digital collections. To achieve the project’s objectives, a consortium of partners comprised of several European libraries, information technology and software engineering centres, and linguistic institutes was established. The consortium’s work was based on interdisciplinary collaboration in which libraries (like NUK played an important role firstly as demonstrators of tools and procedures developed within the project, and secondly as representatives of end-users’ needs and demands. Different European digitisation projects in the past have already included national libraries as project partners and the results of collaboration have been so far quite positive. A case study methodology is used for exploring several dimensions of such collaboration. First of all, the study shows that the consortium ensures libraries the economic and expert groundwork needed for the effective realization of the objectives outlined in the framework of the project. Secondly, the study shows positive results when comparing the sum total of knowledge and experience gained over the course of the project and the efforts invested in it by individual libraries. On the basis of such a success, NUK will be able to expand its digitisation plans. Other advantages include more concrete project outcomes, such as the formation of a common multinational digital collection, applicable OCR technology and metadata standardisation. A comparative study with some of NUK’s other on-going projects

  7. Deep Uncertainty Surrounding Coastal Flood Risk Projections: A Case Study for New Orleans

    Science.gov (United States)

    Wong, Tony E.; Keller, Klaus

    2017-10-01

    Future sea-level rise drives severe risks for many coastal communities. Strategies to manage these risks hinge on a sound characterization of the uncertainties. For example, recent studies suggest that large fractions of the Antarctic ice sheet (AIS) may rapidly disintegrate in response to rising global temperatures, leading to potentially several meters of sea-level rise during the next few centuries. It is deeply uncertain, for example, whether such an AIS disintegration will be triggered, how much this would increase sea-level rise, whether extreme storm surges intensify in a warming climate, or which emissions pathway future societies will choose. Here, we assess the impacts of these deep uncertainties on projected flooding probabilities for a levee ring in New Orleans, LA. We use 18 scenarios, presenting probabilistic projections within each one, to sample key deeply uncertain future projections of sea-level rise, radiative forcing pathways, storm surge characterization, and contributions from rapid AIS mass loss. The implications of these deep uncertainties for projected flood risk are thus characterized by a set of 18 probability distribution functions. We use a global sensitivity analysis to assess which mechanisms contribute to uncertainty in projected flood risk over the course of a 50-year design life. In line with previous work, we find that the uncertain storm surge drives the most substantial risk, followed by general AIS dynamics, in our simple model for future flood risk for New Orleans.

  8. The State of Open Source Electronic Health Record Projects: A Software Anthropology Study.

    Science.gov (United States)

    Alsaffar, Mona; Yellowlees, Peter; Odor, Alberto; Hogarth, Michael

    2017-02-24

    Electronic health records (EHR) are a key tool in managing and storing patients' information. Currently, there are over 50 open source EHR systems available. Functionality and usability are important factors for determining the success of any system. These factors are often a direct reflection of the domain knowledge and developers' motivations. However, few published studies have focused on the characteristics of free and open source software (F/OSS) EHR systems and none to date have discussed the motivation, knowledge background, and demographic characteristics of the developers involved in open source EHR projects. This study analyzed the characteristics of prevailing F/OSS EHR systems and aimed to provide an understanding of the motivation, knowledge background, and characteristics of the developers. This study identified F/OSS EHR projects on SourceForge and other websites from May to July 2014. Projects were classified and characterized by license type, downloads, programming languages, spoken languages, project age, development status, supporting materials, top downloads by country, and whether they were "certified" EHRs. Health care F/OSS developers were also surveyed using an online survey. At the time of the assessment, we uncovered 54 open source EHR projects, but only four of them had been successfully certified under the Office of the National Coordinator for Health Information Technology (ONC Health IT) Certification Program. In the majority of cases, the open source EHR software was downloaded by users in the United States (64.07%, 148,666/232,034), underscoring that there is a significant interest in EHR open source applications in the United States. A survey of EHR open source developers was conducted and a total of 103 developers responded to the online questionnaire. The majority of EHR F/OSS developers (65.3%, 66/101) are participating in F/OSS projects as part of a paid activity and only 25.7% (26/101) of EHR F/OSS developers are, or have been

  9. Study protocol for the translating research in elder care (TREC: building context – an organizational monitoring program in long-term care project (project one

    Directory of Open Access Journals (Sweden)

    Cummings Greta G

    2009-08-01

    Full Text Available Abstract Background While there is a growing awareness of the importance of organizational context (or the work environment/setting to successful knowledge translation, and successful knowledge translation to better patient, provider (staff, and system outcomes, little empirical evidence supports these assumptions. Further, little is known about the factors that enhance knowledge translation and better outcomes in residential long-term care facilities, where care has been shown to be suboptimal. The project described in this protocol is one of the two main projects of the larger five-year Translating Research in Elder Care (TREC program. Aims The purpose of this project is to establish the magnitude of the effect of organizational context on knowledge translation, and subsequently on resident, staff (unregulated, regulated, and managerial and system outcomes in long-term care facilities in the three Canadian Prairie Provinces (Alberta, Saskatchewan, Manitoba. Methods/Design This study protocol describes the details of a multi-level – including provinces, regions, facilities, units within facilities, and individuals who receive care (residents or work (staff in facilities – and longitudinal (five-year research project. A stratified random sample of 36 residential long-term care facilities (30 urban and 6 rural from the Canadian Prairie Provinces will comprise the sample. Caregivers and care managers within these facilities will be asked to complete the TREC survey – a suite of survey instruments designed to assess organizational context and related factors hypothesized to be important to successful knowledge translation and to achieving better resident, staff, and system outcomes. Facility and unit level data will be collected using standardized data collection forms, and resident outcomes using the Resident Assessment Instrument-Minimum Data Set version 2.0 instrument. A variety of analytic techniques will be employed including descriptive

  10. I-15 North Project

    Science.gov (United States)

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  11. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  12. Salt repository project site study plan for water resources: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    The Site Study Plan for Water Resources describes a field program consisting of surface-water and ground-water characterization. The surface-water studies will determine the drainage basin characteristics (i.e., topography, soils, land use), hydrometeorology, runoff to streams and playas, and surface-water quality (i.e., offsite pollution sources in playa lakes and in streams). The environmental ground-water studies will focus on ground-water quality characterization. The site study plan describes for each study the need for the study, study design, data management and use, schedule of proposed activities, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Projects Requirements Document. 78 refs., 8 figs., 5 tabs

  13. An updated hip fracture projection in Asia: The Asian Federation of Osteoporosis Societies study

    Directory of Open Access Journals (Sweden)

    Ching-Lung Cheung

    2018-03-01

    Full Text Available Objectives: Hip fracture is a major public health problem. Earlier studies projected that the total number of hip fracture will increase dramatically by 2050, and most of the hip fracture will occur in Asia. To date, only a few studies provided the updated projection, and none of them focused on the hip fracture projection in Asia. Thus, it is essential to provide the most up to date prediction of hip fracture in Asia, and to evaluate the total direct medical cost of hip fracture in Asia. Methods: We provide the updated projection of hip fracture in 9 Asian Federation of Osteoporosis Societies members using the most updated incidence rate and projected population size. Results: We show that the number of hip fracture will increase from 1,124,060 in 2018 to 2,563,488 in 2050, a 2.28-fold increase. This increase is mainly due to the changes on the population demographics, especially in China and India, which have the largest population size. The direct cost of hip fracture will increase from 9.5 billion United State dollar (USD in 2018 to 15 billion USD in 2050, resulting a 1.59-fold increase. A 2%–3% decrease in incidence rate of hip fracture annually is required to keep the total number of hip fracture constant over time. Conclusions: The results show that hip fracture remains a key public health issue in Asia, despite the available of better diagnosis, treatment, and prevention of fracture over the recent years. Healthcare policy in Asia should be aimed to reduce the burden of hip fracture. Keywords: Hip fracture, Asia, Osteoporosis, Incidence

  14. Study on quality assurance for high-level radioactive waste disposal project

    International Nuclear Information System (INIS)

    Takada, Susumu

    2005-01-01

    The U.S. Department of Energy (DOE) has developed comparatively detailed quality assurance requirements for the high-level radioactive waste disposal systems. Quality assurance is recognized as a key issue for confidence building and smooth implementation of the HLW program in Japan, and Japan is at an initial phase of repository development. Then the quality assurance requirements at site research and site selection, site characterization, and site suitability analysis used in the Yucca Mountain project were examined in detail and comprehensive descriptions were developed using flow charts. Additionally, the applicability to the Japan high-level radioactive waste disposal project was studied. The examination and study were performed for the following QA requirements: The requirements that have the relative importance at site research and site selection, site characterization, and site suitability analysis (such as planning and performing scientific investigations, sample control, data control, model development and use, technical report review, software control, and control of the electric management of data). The requirements that have the relative importance at the whole repository phases (such as quality assurance program, document control, and control of quality assurance records). (author)

  15. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  16. Tedese Project

    Science.gov (United States)

    Buforn, E.; Davila, J. Martin; Bock, G.; Pazos, A.; Udias, A.; Hanka, W.

    The TEDESE (Terremotos y Deformacion Cortical en el Sur de España) project is a joint project of the Universidad Complutense de Madrid (UCM) and Real Instituto y Observatorio de la Armada de San Fernando, Cadiz (ROA) supported by the Spanish Ministerio de Ciencia y Tecnologia with the participation of the GeoforschungZen- trum, Potsdam (GFZ). The aim is to carry out a study of the characteristics of the oc- currence and mechanism of earthquakes together with measurements of crustal struc- ture and deformations in order to obtain an integrated evaluation of seismic risk in southern Spain from. As part of this project a temporal network of 10 broad-band seismological stations, which will complete those already existing in the zone, have been installed in southern Spain and northern Africa for one year beginning in October 2001. The objectives of the project are the study in detail of the focal mechanisms of earthquakes in this area, of structural in crust and upper mantle, of seismic anisotropy in crust and mantle as indicator for tectonic deformation processed and the measure- ments of crustal deformations using techniques with permanent GPS and SLR stations and temporary GPS surveys. From these studies, seismotectonic models and maps will be elaborated and seismic risk in the zone will be evaluated.

  17. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    International Nuclear Information System (INIS)

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work

  18. Private Finance Initiative (PFI for Road Projects in UK: Current Practice with a Case Study

    Directory of Open Access Journals (Sweden)

    Rifat Akbiyikli

    2011-05-01

    Full Text Available The long-term sustainable provision of new and high quality maintained road stock is vitally important, especially in times of economic constraint such as Europe is currently experiencing. The Private Finance Initiative (PFI is one method of financing such large-scale, capital intensive projects. An important aspect of this form of financing projects is that the risks are borne not only by the sponsors but are shared by different types of investors such as equity holders, debt providers, and quasi-equity investors. Consequently, a comprehensive and heuristic risk management process is essential for the success of the project. The proposition made within this paper is that the PFI mechanism provides a Value-for-Money and effective mechanism to achieve this. The structure of this PFI finance and investment on a particular road project therefore enables all project stakeholders to take a long-term perspective. This long-term perspective is reflected in the mechanism of a case study of UK – Class A trunk roads which are examined in detail. This paper presents a novel solution to a modern dilemma.

  19. Case Study Application of the Biodiversity Security Index to Ranking Feasibility Studies for Ecosystem Restoration Projects of the U.S. Army Corps of Engineers

    Science.gov (United States)

    2016-04-01

    ER D C/ EL C R- 16 -1 Ecosystem Management and Restoration Research Program Case Study Application of the Biodiversity Security Index... Biodiversity Security Index to Ranking Feasibility Studies for Ecosystem Restoration Projects of the U.S. Army Corps of Engineers Richard A. Cole... Biodiversity Security Index (BSI) was applied to 23 project sites ranked for restoration feasibility study annual funding by the U. S. Army Corps of

  20. Implementation of Project Management Concept into Industrial Energetics: Case Study in Paper Factory

    Directory of Open Access Journals (Sweden)

    Golub Markovic

    2015-05-01

    Full Text Available Fuel changing is directly linked to market movements of energy sources, consequently, large companies adapt to these changes and move towards economically worthwhile strategies. The appearance of an energy source, change or fuel production startup, is a complex investment project in the field of industrial energetics. This research paper brings a case study of transition from gas to solid fuel in the paper factory, where the factory achieved significant savings by changing the basic fuel. In this study we applied a large number of criteria and parameters of the project management concepts (such as WBS structure, Gantt chart, SWOT analysis, criteria for settlement date, etc.. The purpose of this study is to demonstrate and broaden the knowledge base of in the industrial and energy sectors and to show significant benefits and cost savings which occur as a result of changes of energy sources in the industry involving mass production processes.

  1. Project-based learning in a high school engineering program: A case study

    Science.gov (United States)

    France, Todd

    Generating greater student interest in science, technology, engineering, and mathematics (STEM) has been a major topic of discussion among educators, policymakers, and researchers in recent years, as increasing the number of graduates in these fields is widely considered a necessary step for sustaining the progress of today's society. Fostering this interest must occur before students reach college, and substantial efforts have been made to engage students at K-12 levels in STEM-focused learning. Attempts to involve students in engineering, a vital and growing profession, yet one in which students often have little experience, have frequently emphasized the design and construction of physical products, a practice supported by project-based learning. This thesis examines the environment of an engineering high school course that employed the project-based model. The course is part of a dedicated curricular program which aims to provide students with positive experiences in engineering-related activities while also preparing them for the rigors of college. A case study was conducted to provide insight into the benefits and drawbacks of the learning model. The study's outcomes are intended to provide guidance to educators participating in the design and/or facilitation of project-based activities, particularly those involved with engineering education. The research was performed using a qualitative approach. Long-term engagement with course participants was deemed critical to gaining a comprehensive understanding of the interactions and events that transpired on a daily basis. Nine educators involved with the program were interviewed, as were nineteen of the course's thirty-nine students. A wealth of other relevant data -- including surveys, field notes, and evaluations of student work -- was compiled for analysis as well. The study findings suggest that experiences in problem solving and teamwork were the central benefits of the course. Limitations existed due to a

  2. Revisiting EOR Projects in Indonesia through Integrated Study: EOR Screening, Predictive Model, and Optimisation

    KAUST Repository

    Hartono, A. D.; Hakiki, Farizal; Syihab, Z.; Ambia, F.; Yasutra, A.; Sutopo, S.; Efendi, M.; Sitompul, V.; Primasari, I.; Apriandi, R.

    2017-01-01

    EOR preliminary analysis is pivotal to be performed at early stage of assessment in order to elucidate EOR feasibility. This study proposes an in-depth analysis toolkit for EOR preliminary evaluation. The toolkit incorporates EOR screening, predictive, economic, risk analysis and optimisation modules. The screening module introduces algorithms which assimilates statistical and engineering notions into consideration. The United States Department of Energy (U.S. DOE) predictive models were implemented in the predictive module. The economic module is available to assess project attractiveness, while Monte Carlo Simulation is applied to quantify risk and uncertainty of the evaluated project. Optimization scenario of EOR practice can be evaluated using the optimisation module, in which stochastic methods of Genetic Algorithms (GA), Particle Swarm Optimization (PSO) and Evolutionary Strategy (ES) were applied in the algorithms. The modules were combined into an integrated package of EOR preliminary assessment. Finally, we utilised the toolkit to evaluate several Indonesian oil fields for EOR evaluation (past projects) and feasibility (future projects). The attempt was able to update the previous consideration regarding EOR attractiveness and open new opportunity for EOR implementation in Indonesia.

  3. Revisiting EOR Projects in Indonesia through Integrated Study: EOR Screening, Predictive Model, and Optimisation

    KAUST Repository

    Hartono, A. D.

    2017-10-17

    EOR preliminary analysis is pivotal to be performed at early stage of assessment in order to elucidate EOR feasibility. This study proposes an in-depth analysis toolkit for EOR preliminary evaluation. The toolkit incorporates EOR screening, predictive, economic, risk analysis and optimisation modules. The screening module introduces algorithms which assimilates statistical and engineering notions into consideration. The United States Department of Energy (U.S. DOE) predictive models were implemented in the predictive module. The economic module is available to assess project attractiveness, while Monte Carlo Simulation is applied to quantify risk and uncertainty of the evaluated project. Optimization scenario of EOR practice can be evaluated using the optimisation module, in which stochastic methods of Genetic Algorithms (GA), Particle Swarm Optimization (PSO) and Evolutionary Strategy (ES) were applied in the algorithms. The modules were combined into an integrated package of EOR preliminary assessment. Finally, we utilised the toolkit to evaluate several Indonesian oil fields for EOR evaluation (past projects) and feasibility (future projects). The attempt was able to update the previous consideration regarding EOR attractiveness and open new opportunity for EOR implementation in Indonesia.

  4. Reference terms for the capitalisation study of Mali domestic biogas (BFM) and Climate and Energy in Western Africa (CEnAO) projects. Projects financed by the FISONG arrangement of the French Agency for Development (AFD)

    International Nuclear Information System (INIS)

    2014-01-01

    The BFM project (or domestic biogas project in Mali) project concerns the installation of 100 bio-digesters in Mali, and the CenAO one concerns the building up of wood-energy sector in Bamako. This report first presents these both projects, and then presents the capitalisation study, its objectives (global and specific objectives). It presents the study organisation: method and approach (preliminary phase, realisation, conclusion and recommendation), required abilities for the assessment, duration, documents to be produced

  5. Project Termination from a Benefit Realisation Management Approach : An abductive study of IT and R&D projects

    OpenAIRE

    Franco Gonzalez, Jose Miguel; Luzuriaga Ubilla, Daniela Lorena

    2018-01-01

    Bad or failing projects drain organisational resources in vain, affect team morale,and are a detriment to corporate strategy. Theimportance of terminating a project that will not deliver as promised canhardly be overemphasized, however it is still a major managerial challenge. Throughout this papera call is made toidentify andterminate failing projectsvia a benefit realisation management process, as successful projectsare only those thatdeliver the expected benefits. Thus, the research questi...

  6. A Study on the Evaluation of Science Projects of Primary School Students Based on Scientific Criteria

    Science.gov (United States)

    Gungor, Sema Nur; Ozer, Dilek Zeren; Ozkan, Muhlis

    2013-01-01

    This study re-evaluated 454 science projects that were prepared by primary school students between 2007 and 2011 within the scope of Science Projects Event for Primary School Students. Also, submitted to TUBITAK BIDEB Bursa regional science board by MNE regional work groups in accordance with scientific research methods and techniques, including…

  7. Bill project on energy transition for a green growth - Nr 2188. Impact study

    International Nuclear Information System (INIS)

    Valls, Manuel; Royal, Segolene

    2014-01-01

    This document first proposes a statement by the Minister on Ecology on the motivations of the French bill project on energy transition which notably addresses the development of new energies, expresses a strong political commitment on energy, addresses the big issue of energy saving (with objectives of job creation and price reduction in the building sector), promotes a development of renewable energies based on local resources, aims at the emergence of citizen participation in energy choices and issues. The content of the bill project is then commented. The main addressed issues are: to define common objectives for a successful energy transition, an energy independence and for the struggle against climate change, a better renovation of buildings to save energy, to reduce prices and to create jobs, to develop clean transports to improve air quality and to protect health, to struggle against energy wastes and to promote circular economy, to promote renewable energies, to strengthen nuclear safety and citizen information, to simplify and clarify procedures, to enable citizens, local communities and the State to act together. The document then proposes the text of the bill project. A second part is a report of an impact study of these different issues and objectives addressed in the bill project

  8. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  9. Project Dickey: Evaluation of "Deliverance" Leads to Study in Research and Communications Theory

    Science.gov (United States)

    Birkhead, Douglas; Starck, Kenneth

    1973-01-01

    Reports on a journalism course at the University of South Carolina in which students follow their own interests by working on group projects to study the source, message, channel, and receiver while learning the principles of communication. (RB)

  10. A Study of Using Simulation to Overcome Obstacles That Block the Implementation of Critical Chain Project Management to Project Management Environment

    OpenAIRE

    Chia-Ling Huang; Rong-Kwei Li; Chih-Hung Tsai; Yi-Chan Chung; Yao-Wen Hsu

    2014-01-01

    Since 1997, the Critical Chain Project Management (CCPM) method has received considerable attention. Hundreds of successful CCPM cases have achieved highly reliable on-time delivery (OTD) with short project lead-time (PLT) in multi-project environments. However, two obstacles have remained, blocking the implementation of CCPM to project management (PM) society. The first has been addressed by PM practitioners, who have been less than confident that OTD and PLT can be significantly improved by...

  11. Massachusetts Study of Teacher Supply and Demand: Trends and Projections

    Science.gov (United States)

    Levin, Jesse; Berg-Jacobson, Alex; Atchison, Drew; Lee, Katelyn; Vontsolos, Emily

    2015-01-01

    In April 2015, the Massachusetts Department of Elementary and Secondary Education (ESE) commissioned American Institutes for Research (AIR) to develop a comprehensive set of 10-year projections of teacher supply and demand in order to inform planning for future workforce needs. This included state-level projections both in the aggregate, as well…

  12. The Study on quality control of nuclear power installation project

    International Nuclear Information System (INIS)

    Wu Jie

    2008-01-01

    The quality planning, quality assurance and quality control are discussed by applying the quality control (QC) theory and combining the real situation of the Qinshan II project. This paper is practical and plays an active role in instruction of project quality control by applying the above QC theory and control techniques. (authors)

  13. Open Source Projects in Software Engineering Education: A Mapping Study

    Science.gov (United States)

    Nascimento, Debora M. C.; Almeida Bittencourt, Roberto; Chavez, Christina

    2015-01-01

    Context: It is common practice in academia to have students work with "toy" projects in software engineering (SE) courses. One way to make such courses more realistic and reduce the gap between academic courses and industry needs is getting students involved in open source projects (OSP) with faculty supervision. Objective: This study…

  14. Regional nuclear fuel cycle centers study project

    International Nuclear Information System (INIS)

    Bennett, L.; Catlin, R.G.; Meckoni, V.

    1977-01-01

    The concept of regional fuel cycle centers (RFCC) has attracted wide interest. The concept was endorsed by many countries in discussions at the General Conference of the International Atomic Energy Agency and at the General Assembly of the United Nations. Accordingly, in 1975, the IAEA initiated a detailed study of the RFCC concept. The Agency study has concentrated on what is referred to as the ''back-end'' of the fuel cycle because that is the portion which is currently problematic. The study covers transport, storage, processing and recycle activities starting from the time the spent fuel leaves the reactor storage pools and through all steps until the recycled fuel is in finished fuel elements and shipped to the reactor. A detailed evaluation of the specific features of large regional fuel cycle centers established on a multinational basis vis-a-vis smaller dispersed fuel cycle facilities set up on a national basis has been carried out. The methodology for assessment of alternative strategies for fuel storage, reprocessing, and recycling of plutonium has been developed, characteristic data on material flows and cost factors have been generated, and an analytic system has been developed to carry out such evaluations including appropriate sensitivity analysis. Studies in related areas on institutional and legal, organizational, environmental, materials control and other essential aspects have also been made. The material developed during the course of this Study would enable any group of interested Member States to examine and work out alternative strategies pertinent to their present and projected nuclear fuel cycle needs, as well as evolve institutional, legal and other appropriate frameworks or agreements for the establishment of fuel cycle centers on a multinational cooperative basis

  15. Big Data Science Education: A Case Study of a Project-Focused Introductory Course

    Science.gov (United States)

    Saltz, Jeffrey; Heckman, Robert

    2015-01-01

    This paper reports on a case study of a project-focused introduction to big data science course. The pedagogy of the course leveraged boundary theory, where students were positioned to be at the boundary between a client's desire to understand their data and the academic class. The results of the case study demonstrate that using live clients…

  16. "Cheesy Pizza": The Pizza Project

    Science.gov (United States)

    Gallick, Barbara; Lee, Lisa

    2009-01-01

    A class of 3- to 5-year-old children in a midwestern child care center chose to study pizza restaurants as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teachers' reflections on the project. Photos taken during the project and children's sketches are included. (Contains…

  17. Simple Tools to Facilitate Project Management of a Nursing Research Project.

    Science.gov (United States)

    Aycock, Dawn M; Clark, Patricia C; Thomas-Seaton, LaTeshia; Lee, Shih-Yu; Moloney, Margaret

    2016-07-01

    Highly organized project management facilitates rigorous study implementation. Research involves gathering large amounts of information that can be overwhelming when organizational strategies are not used. We describe a variety of project management and organizational tools used in different studies that may be particularly useful for novice researchers. The studies were a multisite study of caregivers of stroke survivors, an Internet-based diary study of women with migraines, and a pilot study testing a sleep intervention in mothers of low-birth-weight infants. Project management tools were used to facilitate enrollment, data collection, and access to results. The tools included protocol and eligibility checklists, event calendars, screening and enrollment logs, instrument scoring tables, and data summary sheets. These tools created efficiency, promoted a positive image, minimized errors, and provided researchers with a sense of control. For the studies described, there were no protocol violations, there were minimal missing data, and the integrity of data collection was maintained. © The Author(s) 2016.

  18. Students' Research Experiences during Consulting Projects: Three Themes Emerging from Case Studies

    Science.gov (United States)

    Phillips, Carissa M. Holler

    2010-01-01

    Student consulting projects, an advanced form of problem-based learning, allow students to apply the skills developed in their classes on behalf of client organizations. A review of selected case studies in business education and other management education literature shows that research is an integral part of this consulting process. More than…

  19. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  20. The TERRA project, a space nuclear micro-reactor case study

    International Nuclear Information System (INIS)

    Guimaraes, Lamartine N.F.; Nascimento, Jamil A.; Borges, Eduardo M.; Lobo, Paulo D. Castro; Placco, Guilherme M.; Barrios Junior, Ary G.

    2011-01-01

    The TEcnologia de Reatores Rapidos Avancados project, also known as TERRA Project is been conducted by the Institute for Advanced Studies IEAv. The TERRA project has a general objective of understanding and developing the key technologies that will allow (Brazil) the use of nuclear technology to generate electricity in space. This electricity may power several space systems and/or a type of plasma based engine. Also, the type of reactor intended for space may be used for power generation in very inhospitable environment such as the ocean floor. Some of the mentioned technologies may include: Brayton cycles, Stirling engines, heat pipes and its coupled systems, nuclear fuel technology, new materials and several others. Once there is no mission into which apply this technology, at this moment, this research may be conducted in many forms and ways. The fact remains that when this technology becomes needed there will be no way that we (Brazilians) will be able to buy it from. This technology, in this sense, is highly strategic and will be the key to commercially explore deep space. Therefore, there is the need to face the development problems and solve them, to gain experience with our own rights and wrongs. This paper will give a brief overview of what has been done so far, on experimental facilities and hardware that could support space system development, including a Brayton cycle test facility, Tesla turbine testing, and Stirling engine development and modeling. Our great problem today is lack of human resources. To attend that problem we are starting a new graduate program that will allow overcoming that, given the proper time frame. (author)

  1. The TERRA project, a space nuclear micro-reactor case study

    Energy Technology Data Exchange (ETDEWEB)

    Guimaraes, Lamartine N.F.; Nascimento, Jamil A.; Borges, Eduardo M.; Lobo, Paulo D. Castro, E-mail: guimarae@ieav.cta.br, E-mail: jamil@ieav.cta.br, E-mail: eduardo@ieav.cta.br [Divisao de Energia Nuclear. Instituto de Estudos Avancados, Sao Jose dos Campos, SP (Brazil); Placco, Guilherme M.; Barrios Junior, Ary G. [Faculdade de Tecnologia Sao Francisco (FATESF), Jacarei, SP (Brazil)

    2011-07-01

    The TEcnologia de Reatores Rapidos Avancados project, also known as TERRA Project is been conducted by the Institute for Advanced Studies IEAv. The TERRA project has a general objective of understanding and developing the key technologies that will allow (Brazil) the use of nuclear technology to generate electricity in space. This electricity may power several space systems and/or a type of plasma based engine. Also, the type of reactor intended for space may be used for power generation in very inhospitable environment such as the ocean floor. Some of the mentioned technologies may include: Brayton cycles, Stirling engines, heat pipes and its coupled systems, nuclear fuel technology, new materials and several others. Once there is no mission into which apply this technology, at this moment, this research may be conducted in many forms and ways. The fact remains that when this technology becomes needed there will be no way that we (Brazilians) will be able to buy it from. This technology, in this sense, is highly strategic and will be the key to commercially explore deep space. Therefore, there is the need to face the development problems and solve them, to gain experience with our own rights and wrongs. This paper will give a brief overview of what has been done so far, on experimental facilities and hardware that could support space system development, including a Brayton cycle test facility, Tesla turbine testing, and Stirling engine development and modeling. Our great problem today is lack of human resources. To attend that problem we are starting a new graduate program that will allow overcoming that, given the proper time frame. (author)

  2. Apply Lean Thinking in Project Management

    OpenAIRE

    Pham Ngoc, Lan

    2015-01-01

    The purpose of this thesis was to study the effects of Lean Thinking in Project Management and how applying Lean Project Management could enhance the productivity of project work. The study was carried using theoretical research and collecting empirical data from three interviews and one case study at a local company. At the end of the study, the major project management problems at the company were identified and analyzed following Lean Principles. It was also pointed out where there...

  3. Large-Scale Urban Projects, Production of Space and Neo-liberal Hegemony: A Comparative Study of Izmir

    Directory of Open Access Journals (Sweden)

    Mehmet PENPECİOĞLU

    2013-04-01

    Full Text Available With the rise of neo-liberalism, large-scale urban projects (LDPs have become a powerful mechanism of urban policy. Creating spaces of neo-liberal urbanization such as central business districts, tourism centers, gated residences and shopping malls, LDPs play a role not only in the reproduction of capital accumulation relations but also in the shift of urban political priorities towards the construction of neo-liberal hegemony. The construction of neo-liberal hegemony and the role played by LDPs in this process could not only be investigated by the analysis of capital accumulation. For such an investigation; the role of state and civil society actors in LDPs, their collaborative and conflictual relationships should be researched and their functions in hegemony should be revealed. In the case of Izmir’s two LDPs, namely the New City Center (NCC and Inciraltı Tourism Center (ITC projects, this study analyzes the relationship between the production of space and neo-liberal hegemony. In the NCC project, local governments, investors, local capital organizations and professional chambers collaborated and disseminated hegemonic discourse, which provided social support for the project. Through these relationships and discourses, the NCC project has become a hegemonic project for producing space and constructed neo-liberal hegemony over urban political priorities. In contrast to the NCC project, the ITC project saw no collaboration between state and organized civil society actors. The social opposition against the ITC project, initiated by professional chambers, has brought legal action against the ITC development plans in order to prevent their implementation. As a result, the ITC project did not acquire the consent of organized social groups and failed to become a hegemonic project for producing space.

  4. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  5. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    International Nuclear Information System (INIS)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources

  6. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  7. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  8. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  9. BIOMETORE Project - Studying the Biodiversity in the Northeastern Atlantic Seamounts

    Science.gov (United States)

    Dos Santos, A.; Biscoito, M.; Campos, A.; Tuaty Guerra, M.; Meneses, G.; Santos, A. M. P. A.

    2016-02-01

    Understanding the deep-sea ecosystem functioning is a key issue in the study of ocean sciences. Bringing together researchers from several scientific domains, the BIOMETORE project aims to the increase knowledge on deep-sea ecosystems and biodiversity at the Atlantic seamounts of the Madeira-Tore and Great Meteor geological complexes. The project outputs will provide important information for the understanding and sustainable management of the target seamount ecosystems, thus contributing to fulfill knowledge gaps on their biodiversity, from bacteria to mammals, and food webs, as well as to promote future sustainable fisheries and sea-floor integrity. The plan includes the realization of eight multidisciplinary surveys, four done during the summer of 2015 and another four planned for the same season of 2016, in target seamounts: the Gorringe bank, the Josephine, and others in the Madeira-Tore, and selected ones in the Greta Meteor (northeastern Atlantic Ocean). The surveys cover a number of scientific areas in the domains of oceanography, ecology, integrative taxonomy, geology, fisheries and spatial mapping. We present and discuss BIOMETORE developments, the preliminary results from the four 2015 summer surveys, and the planning of the next four surveys.

  10. Final project report for NEET pulsed ion beam project

    Energy Technology Data Exchange (ETDEWEB)

    Kucheyev, S. O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2018-01-11

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurement of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.

  11. Stakeholder Salience in ERP Projects

    OpenAIRE

    Salhotra, Eashan

    2014-01-01

    The aim of this study is to examine stakeholder involvement in an Enterprise Resource Planning (ERP) System project that involves implementation and improvement of the implemented system. The study targets stakeholders, their classification, and their degree of importance during different phases of an ERP project life cycle, i.e. planning, implementation, stabilisation and improvement. The study shows that stakeholder involvement and their salience vary along the ERP project life cycle a...

  12. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  13. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  14. Modeling and Simulation Optimization and Feasibility Studies for the Neutron Detection without Helium-3 Project

    Energy Technology Data Exchange (ETDEWEB)

    Ely, James H.; Siciliano, Edward R.; Swinhoe, Martyn T.; Lintereur, Azaree T.

    2013-01-01

    This report details the results of the modeling and simulation work accomplished for the ‘Neutron Detection without Helium-3’ project during the 2011 and 2012 fiscal years. The primary focus of the project is to investigate commercially available technologies that might be used in safeguards applications in the relatively near term. Other technologies that are being developed may be more applicable in the future, but are outside the scope of this study.

  15. A comprehensive study on decreasing the kilovoltage cone-beam CT dose by reducing the projection number.

    Science.gov (United States)

    Lu, Bo; Lu, Haibin; Palta, Jatinder

    2010-05-12

    The objective of this study was to evaluate the effect of kilovoltage cone-beam computed tomography (CBCT) on registration accuracy and image qualities with a reduced number of planar projections used in volumetric imaging reconstruction. The ultimate goal is to evaluate the possibility of reducing the patient dose while maintaining registration accuracy under different projection-number schemes for various clinical sites. An Elekta Synergy Linear accelerator with an onboard CBCT system was used in this study. The quality of the Elekta XVI cone-beam three-dimensional volumetric images reconstructed with a decreasing number of projections was quantitatively evaluated by a Catphan phantom. Subsequently, we tested the registration accuracy of imaging data sets on three rigid anthropomorphic phantoms and three real patient sites under the reduced projection-number (as low as 1/6th) reconstruction of CBCT data with different rectilinear shifts and rota-tions. CBCT scan results of the Catphan phantom indicated the CBCT images got noisier when the number of projections was reduced, but their spatial resolution and uniformity were hardly affected. The maximum registration errors under the small amount transformation of the reference CT images were found to be within 0.7 mm translation and 0.3 masculine rotation. However, when the projection number was lower than one-fourth of the full set with a large amount of transformation of reference CT images, the registration could easily be trapped into local minima solutions for a nonrigid anatomy. We concluded, by using projection-number reduction strategy under conscientious care, imaging-guided localization procedure could achieve a lower patient dose without losing the registration accuracy for various clinical sites and situations. A faster scanning time is the main advantage compared to the mA decrease-based, dose-reduction method.

  16. A CMMI-based approach for medical software project life cycle study.

    Science.gov (United States)

    Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi

    2013-01-01

    In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.

  17. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  18. Summaries of studies carried out in the NKS/BOK-2 project. Technical report[Radiological and environmental consequences

    Energy Technology Data Exchange (ETDEWEB)

    Palsson, S E [Icelandic Radiation Protection Inst., Reykjavik (Iceland)

    2002-12-01

    Summaries of studies carried out in the NKSBOK-2 project, Radiological and Environmental Consequences. The structure of the project as such is described in NKS-64, Radiological and Environmental Consequences - Final Report of the Nordic Nuclear Safety Research Project BOK-2. That report also includes compilations based on the summaries presented in this report. The project was carried out 1998-2001 with participants from all the Nordic countries. Representatives from the Baltic States were also invited to some of the meetings and seminars. The project consisted of work on terrestrial and marine radioecology and had a broad scope in order to enable participation of research groups with various fields of interest. The topics included improving assessment of old and recent fallout, use of radionuclides as tracers in Nordic marine areas, improving assessment of internal doses and use of mass spectrometry in radioecology. This report is a compilation of summaries from each research group, 32 papers in all, and gives references to papers published in scientific journals. Some of the studies have been described previously, at least to some degree, in NKS-70, Proceedings of the 8{sup th} Nordic Seminar on Radioecology, 25-28 February 2001, Rovaniemi, Finland. (au)

  19. CSCW Challenges in Large-Scale Technical Projects - a case study

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Kyng, Morten; Mogensen, Preben Holst

    1992-01-01

    This paper investigates CSCW aspects of large-scale technical projects based on a case study of a specific Danish engineering company and uncovers s challenges to CSCW applications in this setting. The company is responsible for management and supervision of one of the worlds largest tunnel....... The initial qualitative analysis identified a number of bottlenecks in daily work, where support for cooperation is needed. Examples of bottlenecks are: sharing materials, issuing tasks, and keeping track of task status. Grounded in the analysis, cooperative design workshops based on scenarios of future work...

  20. Customer Ranking Model for Project Businesses: A Case Study from the Automotive Industry

    Directory of Open Access Journals (Sweden)

    Bernd Markus Zunk

    2014-03-01

    Full Text Available For technology-orientated enterprises that operate project-based businesses, the goal-oriented allocation of scarce marketing resources has great potential to help consolidate their competitive position. An important precondition for goal-oriented management is the identification of the most valuable customers. This enables technology-orientated enterprises to segment markets in order to make tactical marketing decisions. This theorybased paper aims to develop and test a holistic customer ranking model. By deploying the five steps presented in this paper, customer relationship managers are better able to identify and to rank their customers in project-based businesses. A case study provides an example of the application of the method from the automotive industry in Austria. The experiences derived from this case study show that using a customer ranking framework is a crucial factor for enterprises in narrow technology markets to be successful and to achieve their corporate goals.

  1. An Evaluation of the Agriculture Science Project in Mauritius. African Studies in Curriculum Development & Evaluation No. 102.

    Science.gov (United States)

    Jeeroburkhan, M. Fazal

    This study evaluated the Agricultural Curriculum Project which is being implemented in 16 secondary schools in Mauritius. Specific areas examined included: (1) the relevance, appropriateness, and practicability of the project's general objectives; (2) the relevance, balance, and organization of the course content; (3) the effectiveness and…

  2. Using the Lashof Accounting Methodology to Assess Carbon Mitigation Projects Using LCA: Ethanol Biofuel as a Case Study

    DEFF Research Database (Denmark)

    Courchesne, Alexandre; Becaert, Valerie; Rosenbaum, Ralph K.

    2010-01-01

    and comparison of different carbon mitigation projects (e.g. biofuel use, sequestering plant, afforestation project, etc.). The Lashof accounting methodology is chosen amid other methods of greenhouse gas (GHG) emission characterization for its relative simplicity and capability of characterizing all types...... of carbon mitigation projects. It calculates the cumulative radiative forcing caused by GHG emission within a predetermined time frame. Basically, the developed framework uses the Mg-year as a functional unit and isolates impacts related to the climate mitigation function with system expansion. The proposed...... framework is demonstrated with a case study of tree ethanol pathways (maize, sugarcane and willow). Study shows that carbon mitigation assessment through LCA is possible and that it could be a useful tool for decision makers as it can compare different projects regardless of their original context. Case...

  3. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  4. The Kintyre uranium project

    International Nuclear Information System (INIS)

    Larson, B.

    1997-01-01

    The Kintyre Uranium Project is being developed by Canning Resources Pty Ltd, a subsidiary of Rio Tinto (formerly CRA). The work on the project includes the planning and management of a number of background environmental studies. The company has also commissioned studies by external consultants into process technologies, mining strategies and techniques for extracting the uranium ore from the waste rock. In addition, Canning Resources has made a detailed assessment of the worldwide market potential for Australian uranium in the late 1990s and into the 21st century. The most significant factor affecting the future of this project is the current product price. This price is insufficient to justify the necessary investment to bring this project into production

  5. Near field studies within the SKB 91 Project

    International Nuclear Information System (INIS)

    Widen, H.; Bengtsson, A.; Grundfelt, B.

    1991-06-01

    A number of near field studies was preformed during the early part of the SKB91 project. This report summaries this work and includes: - Simulation of the steady release from the near field with different time for canister penetration. - Simulation of the release from a repository with 5300 canisters with different penetration times for different parts of the canisters due to manufacturing error, glaciations, inner over pressure and corrosion. - Calculation with a numerical model of the transient release of the instantaneously dissolvable species and the effect of different boundary conditions both at the canister/bentonite and the bentonite/rock interface. - Description of the implementation of a resistance network model for the calculation of the steady state transport resistances in the different pathways from the canisters. - Comparison of two analytical models for the calculation of the release of the instantaneously dissolvable species. (au)

  6. The Use of Mobile Technologies in Project-Based Science: A Case Study

    Science.gov (United States)

    Avraamidou, Lucy

    2013-01-01

    The main aim of this study was to examine how a group of elementary students perceived their engagement in a project-based science intervention investigating the water quality of a local lake. The students collaborated with a scientist to conduct various experiments and used handheld computers to collect and analyze data in order to examine the…

  7. Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Vaught, Douglas J.

    2007-03-31

    The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNC’s technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clark’s Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least one year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clark’s Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).

  8. A Three Cohort Study of Role-Play Instruction for Agile Project Management

    Science.gov (United States)

    Schmitz, Kurt

    2018-01-01

    Agile Project Management methods and processes that emphasize action and feedback over planning continue to gain prominence for Information Systems projects. This topic is an ideal candidate to lead the evolution of project management instruction from teaching "about" to learning "how to." This paper describes a role-play…

  9. Study on the maturity model of nuclear power project management in China

    International Nuclear Information System (INIS)

    Chen Changbing; Li Huiqiang; Zheng Yanguo

    2009-01-01

    Based on the general project management maturity model, this paper discussed the establishment of nuclear power engineering project management maturity model in China, and proposed a basic framework in order to provide a way for improving and evaluating the ability of nuclear power project management in China. (authors)

  10. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  11. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  12. The quality of Portuguese Environmental Impact Studies: The case of small hydropower projects

    International Nuclear Information System (INIS)

    Pinho, Paulo; Maia, Rodrigo; Monterroso, Ana

    2007-01-01

    In most Environmental Impact Assessment (EIA) systems environmental authorities can stop an EIA process by refusing the respective EIA Report, on the grounds of technical or methodological insufficiencies identified in the review procedure. However, often times, it cannot be taken for granted that, once an EIA Report is formally accepted, as part of an EIA process, its quality standard is, consistently, of a satisfactory level. This paper summarises the results of a one-year research project aimed at assessing the quality of EIA studies carried out for small hydropower plants in Portugal. An extensive survey was carried out to analyse all EIA Reports that were the basis of successful EIA processes involving this kind of small scale projects, under the old and the new national EIA legislation, that is, over the last two decades. Often times unnoticeable to the general public and the media, located in isolated areas upstream secondary rivers, these projects are likely to generate some significant environmental impacts, in particular on the aesthetics value and character of local landscapes and on pristine ecological habitats. And yet, they are usually regarded as environmental friendly projects designed to produce emission free energy. The design of the evaluation criteria benefited from the literature review on similar research projects carried out in other EU countries. The evaluation exercise revealed a number of technical and methodological weaknesses in a significant percentage of cases. A set of simple and clear cut recommendations is proposed twofold: to improve the current standard of EIA practice and to strengthen the role of the so called EIA Commissions, at the crucial review stage of the EIA process

  13. Brokerage by a Project Manager across a New Product Development Project

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Jepsen, Anna Lund; Dietrich, Perttu

    2012-01-01

    between three subtypes of brokerage: Brokerage connecting actors from the project team with actors from the various departments within the same organization (intra-organizational brokerage), brokerage connecting employees at the NPD organization with someone working in another organization (inter...... as a hub between possible suppliers for the project. We had also expected that the PM would be more involved in coordination of, to and from the project team than what we found in this study. Based on the study, it seems that some of the connections that we, based on existing knowledge, would expect...... that the management of the project in terms of linking the stakeholders takes off in the solution development phase rather than in the concept development phase which is the phase in focus in large parts of the research that has taken place in this field. Further, contrary to expectations based on existing knowledge...

  14. Coordinated research projects (CRP). Coordinated research project (CRP)

    International Nuclear Information System (INIS)

    Takagi, Hidekazu; Koike, Fumihiro; Nakamura, Nobuyuki

    2013-01-01

    In the present paper, the contribution of Japanese scientists in coordinated research projects on thermonuclear fusion. Representative subjects taken in seven projects are the precise computation of theoretical data on electron-molecule collisions in the peripheral plasma, the computation of spectroscopic data of multi-charged tungsten ions, the spectroscopic measurement of multi-charged tungsten ions using an ion trap device, the development of collisional-radiative model for plasmas including hydrogen and helium, the computational and theoretical studies on the behavior of tungsten and beryllium in the plasma-wall interaction, the study on the property of dusts generated in fusion devices. These subjects are those of most important issues in ITER. (author)

  15. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  16. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  17. The Cigar Lake analog study: An international R ampersand D project

    International Nuclear Information System (INIS)

    Cramer, J.J.; Sargent, F.P.

    1994-01-01

    This paper provides background information and summarizes the results of AECL's analog study on the Cigar Lake uranium deposit. This R ampersand D project includes national and international cooperation with many organizations directly or indirectly involved in nuclear waste management research. The emphasis is on the analog aspects of this deposit and the implications of modelling activities related to the environmental and safety assessment of the Canadian disposal concept for nuclear fuel waste

  18. APPLICATION OF PROJECT BASED LEARNING IN THE DISCIPLINE OF LOGISTICS: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Paulo Cesar Chagas Rodrigues

    2011-06-01

    Full Text Available Currently the higher education institutions need to search for new tools and methods to make learning more enjoyable and dynamic for students because the job market increasingly needs young people who have the ability to self-criticism above average. A search was performed on a course of action and technologist who had a total of 15 students, for the purpose of this research was to improve the learning level of students, reducing absenteeism and dropout, encourage research and participation in teamwork. As a way to develop this study the students had to develop a project of a bridge made of newspaper and involving the disciplines of logistics, financial management, human resource management and managing projects.

  19. Final report to the Atomic Energy Control Board on project management capabilities using NAOP as a case study

    International Nuclear Information System (INIS)

    Masters, P.

    1998-01-01

    The purpose of this report is to identify practices of the Atomic Energy Control Board that support or detract from the implementation of collaborative cross-functional project management and to recommend ways and means of increasing the Board's ability to respond to projects. Ontario Hydro's Nuclear Asset Optimization Program (NAOP) and the Board's response to that program form the basis of a case study for the purposes of this report. Issues examined include: Whether the Board follows a logical project management framework when it addresses projects such as the NAOP; where the Board exhibits good practices in addressing project such as the NAOP; and where the Board needs to develop better practices

  20. The economics of project analysis: Optimal investment criteria and methods of study

    Science.gov (United States)

    Scriven, M. C.

    1979-01-01

    Insight is provided toward the development of an optimal program for investment analysis of project proposals offering commercial potential and its components. This involves a critique of economic investment criteria viewed in relation to requirements of engineering economy analysis. An outline for a systems approach to project analysis is given Application of the Leontief input-output methodology to analysis of projects involving multiple processes and products is investigated. Effective application of elements of neoclassical economic theory to investment analysis of project components is demonstrated. Patterns of both static and dynamic activity levels are incorporated.

  1. Learning from Experience Case Studies of the Hyper-X Project

    Science.gov (United States)

    Peebles, Curtis

    2009-01-01

    The Hyper-X project (X-43A) provides a number of "lessons learned" which can be applied to other aerospace project. The specific areas examined were the selection of the goals of the Hyper-X. How the technical unknowns and assumptions were handled. The final lesson was the ambiguous nature of risk assessment, and how trying to remove a technical unknown can have unintended consequences.

  2. Project on Alternative Systems Study - PASS. Final report

    International Nuclear Information System (INIS)

    1992-10-01

    Alternative repository systems for deep disposal of spent fuel and different types of canisters are studied regarding technical aspects in Project on Alternative System Study (PASS). The objective is to present a ranking of repository systems as well as of canister types for each system. The studies and compared systems are: KBS-3, Medium Long Tunnels (MLH), Long tunnels (VLH) and Deep Boreholes (VDH). For KBS-3 and MLH five canister types are compared (copper/steel, copper/lead, copper (HIP), steel/lead and steel), for VLH two types (copper/steel and steel), and for VDH three types (titanium/concrete with non-consolidated fuel assemblies, titanium/concrete with consolidated assemblies and copper (HIP) with non-consolidated assemblies). The comparison is separated into three sub-comparisons (Technology, Long-term performance and safety, and Costs), which eventually are merged into one ranking. With respect to canister alternatives the result is that the copper/steel canister is ranked first for KBS-3, MLH and VLH, while the titanium/concrete canister is ranked first for VDH (non-consolidated as well as consolidated assemblies. With these canister alternatives the merged ranking of repository systems results in placing KBS-3 slightly in front of MLH. VLH comes thereafter and VDH last. (32 refs.)

  3. Managemant of NASA's major projects

    Science.gov (United States)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  4. Strengthening organizational performance through accreditation research-a framework for twelve interrelated studies: the ACCREDIT project study protocol

    Directory of Open Access Journals (Sweden)

    Pope Catherine

    2011-10-01

    Full Text Available Abstract Background Service accreditation is a structured process of recognising and promoting performance and adherence to standards. Typically, accreditation agencies either receive standards from an authorized body or develop new and upgrade existing standards through research and expert views. They then apply standards, criteria and performance indicators, testing their effects, and monitoring compliance with them. The accreditation process has been widely adopted. The international investments in accreditation are considerable. However, reliable evidence of its efficiency or effectiveness in achieving organizational improvements is sparse and the value of accreditation in cost-benefit terms has yet to be demonstrated. Although some evidence suggests that accreditation promotes the improvement and standardization of care, there have been calls to strengthen its research base. In response, the ACCREDIT (Accreditation Collaborative for the Conduct of Research, Evaluation and Designated Investigations through Teamwork project has been established to evaluate the effectiveness of Australian accreditation in achieving its goals. ACCREDIT is a partnership of key researchers, policymakers and agencies. Findings We present the framework for our studies in accreditation. Four specific aims of the ACCREDIT project, which will direct our findings, are to: (i evaluate current accreditation processes; (ii analyse the costs and benefits of accreditation; (iii improve future accreditation via evidence; and (iv develop and apply new standards of consumer involvement in accreditation. These will be addressed through 12 interrelated studies designed to examine specific issues identified as a high priority. Novel techniques, a mix of qualitative and quantitative methods, and randomized designs relevant for health-care research have been developed. These methods allow us to circumvent the fragmented and incommensurate findings that can be generated in small

  5. Strengthening organizational performance through accreditation research-a framework for twelve interrelated studies: the ACCREDIT project study protocol.

    Science.gov (United States)

    Braithwaite, Jeffrey; Westbrook, Johanna; Johnston, Brian; Clark, Stephen; Brandon, Mark; Banks, Margaret; Hughes, Clifford; Greenfield, David; Pawsey, Marjorie; Corbett, Angus; Georgiou, Andrew; Callen, Joanne; Ovretveit, John; Pope, Catherine; Suñol, Rosa; Shaw, Charles; Debono, Deborah; Westbrook, Mary; Hinchcliff, Reece; Moldovan, Max

    2011-10-09

    Service accreditation is a structured process of recognising and promoting performance and adherence to standards. Typically, accreditation agencies either receive standards from an authorized body or develop new and upgrade existing standards through research and expert views. They then apply standards, criteria and performance indicators, testing their effects, and monitoring compliance with them. The accreditation process has been widely adopted. The international investments in accreditation are considerable. However, reliable evidence of its efficiency or effectiveness in achieving organizational improvements is sparse and the value of accreditation in cost-benefit terms has yet to be demonstrated. Although some evidence suggests that accreditation promotes the improvement and standardization of care, there have been calls to strengthen its research base.In response, the ACCREDIT (Accreditation Collaborative for the Conduct of Research, Evaluation and Designated Investigations through Teamwork) project has been established to evaluate the effectiveness of Australian accreditation in achieving its goals. ACCREDIT is a partnership of key researchers, policymakers and agencies. We present the framework for our studies in accreditation. Four specific aims of the ACCREDIT project, which will direct our findings, are to: (i) evaluate current accreditation processes; (ii) analyse the costs and benefits of accreditation; (iii) improve future accreditation via evidence; and (iv) develop and apply new standards of consumer involvement in accreditation. These will be addressed through 12 interrelated studies designed to examine specific issues identified as a high priority. Novel techniques, a mix of qualitative and quantitative methods, and randomized designs relevant for health-care research have been developed. These methods allow us to circumvent the fragmented and incommensurate findings that can be generated in small-scale, project-based studies. The overall

  6. Critical success factors in infrastructure projects

    Science.gov (United States)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  7. San Joaquin River Up-Stream DO TMDL Project Task 4: MonitoringStudy Interim Task Report #3

    Energy Technology Data Exchange (ETDEWEB)

    Stringfellow, William; Borglin, Sharon; Dahlgren, Randy; Hanlon,Jeremy; Graham, Justin; Burks, Remie; Hutchinson, Kathleen

    2007-03-30

    The purpose of the Dissolved Oxygen Total Maximum Daily LoadProject (DO TMDLProject) is to provide a comprehensive understanding ofthe sources and fate of oxygen consuming materials in the San JoaquinRiver (SJR) watershed between Channel Point and Lander Avenue (upstreamSJR). When completed, this study will provide the stakeholders anunderstanding of the baseline conditions of the basin, provide input foran allocation decision, and provide the stakeholders with a tool formeasuring the impact of any waterquality management program that may beimplemented as part of the DO TMDL process. Previous studies haveidentified algal biomass as the most significant oxygen-demandingsubstance in the DO TMDL Project study-area between of Channel Point andLander Ave onthe SJR. Other oxygen-demanding substances found in theupstream SJR include ammonia and organic carbon from sources other thanalgae. The DO TMDL Project study-area contains municipalities, dairies,wetlands, cattle ranching, irrigated agriculture, and industries thatcould potentially contribute biochemical oxygen demand (BOD) to the SJR.This study is designed to discriminate between algal BOD and othersources of BOD throughout the entire upstream SJR watershed. Algalbiomass is not a conserved substance, but grows and decays in the SJR;hence, characterization of oxygen-demanding substances in the SJR isinherently complicated and requires an integrated effort of extensivemonitoring, scientific study, and modeling. In order to achieve projectobjectives, project activities were divided into a number of Tasks withspecific goals and objectives. In this report, we present the results ofmonitoring and research conducted under Task 4 of the DO TMDL Project.The major objective of Task 4 is to collect sufficient hydrologic (flow)and water quality (WQ) data to characterize the loading of algae, otheroxygen-demanding materials, and nutrients fromindividual tributaries andsub-watersheds of the upstream SJR between Mossdale and

  8. The role intuitive decision making plays in project selection in the residential property market: a case study of a medium sized

    OpenAIRE

    Ryan, Diarmuid

    2013-01-01

    non-peer-reviewed This thesis addresses the role of intuition in project selection in residential property development. The paper provides a comprehensive review of existing literature in relation to project selection and decision making. In addition, the examination of the project files of M.A. Ryan & Sons Ltd., a medium sized property development company, has enabled a case study to be carried out on three projects carried out by the organisation. Through the case study, t...

  9. Salt Repository Project site study plan for background environmental radioactivity: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    The Site Study Plan for Background Environmental Radioactivity describes a field program consisting of an initial radiological survey and a radiological sampling program. The field program includes measurement of direct radiation and collection and analysis of background radioactivity samples of air, precipitation, soil, water, milk, pasture grass, food crops, meat, poultry, game, and eggs. The plan describes for each study the need for the study, the study design, data management, and use, schedule of proposed activities, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document. 43 refs., 10 figs., 7 tabs

  10. Geomechanical/Geochemical Modeling Studies Conducted within the International DECOVALEX Project

    International Nuclear Information System (INIS)

    Birkholzer, J.T.; Rutqvist, J.; Sonnenthal, E.L.; Barr, D.; Chijimatsu, M.; Kolditz, O.; Liu, Q.; Oda, Y.; Wang, W.; Xie, M.; Zhang, C.

    2005-01-01

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysis of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status

  11. Geomechanical/Geochemical Modeling Studies Conducted Within the International DECOVALEX Project

    International Nuclear Information System (INIS)

    J.T. Birkholzer; J. Rutqvist; E.L. Sonnenthal; D. Barr; M.Chijimatsu; O. Kolditz; Q. Liu; Y. Oda; W. Wang; M. Xie; C. Zhang

    2006-01-01

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysis of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status

  12. A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects

    Directory of Open Access Journals (Sweden)

    Dennis Travagini Cremonese

    Full Text Available Abstract In the early stage of front-end studies of a Mining Project, the global availability (i.e. number of hours a plant is available for production and production (number of hours a plant is actually operated with material time of the process plant are normally assumed based on the experience of the study team. Understanding and defining the availability hours at the early stages of the project are important for the future stages of the project, as drastic changes in work hours will impact the economics of the project at that stage. An innovative high-level dynamic modeling approach has been developed to assist in the rapid evaluation of assumptions made by the study team. This model incorporates systems or equipment that are commonly used in mining projects from mine to product stockyard discharge after the processing plant. It includes subsystems that will simulate all the component handling, and major process plant systems required for a mining project. The output data provided by this high-level dynamic simulation approach will enhance the confidence level of engineering carried out during the early stage of the project. This study discusses the capabilities of the approach, and a test case compared with standard techniques used in mining project front-end studies.

  13. Supply Chain Management in Flyover Projects in India

    Directory of Open Access Journals (Sweden)

    Sudhir Yadav

    2015-01-01

    Full Text Available This paper explores the application of supply chain management (SCM in the Indian construction industry. The authors studied the SCM practices followed in flyover projects and compared them with the seamless SCM model for construction proposed by a previous study. A case study approach was followed for the research work. Structured interviews were conducted to understand the SCM practices in flyover projects in India. The developed model advocates leading roles for client and strategic needs analysis and value management study that are missing in the studied projects. All of the projects studied faced cost and time overruns. The seamless SCM model may be extended to developing countries by incorporating requirements related to the long-term relationship between project agents and, if possible, by suggesting that clients should not select agents using only the minimal cost criteria. The extended model also proposes SCM training for all project agents before the start of the project. Strategic needs analysis and value management study should be an integral part of the construction project to improve project efficiency. Implementing the seamless SCM model calls for the early involvement (i.e., at the project design stage of all project agents. Project sponsors can apply the findings of this study to manage time and cost overruns.

  14. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  15. ENGINEERING STUDY FOR THE 200 AREA EFFLUENT TREATMENT FACILITY (ETF) SECONDARY WASTE TREATMENT OF PROJECTED FUTURE WASTE FEEDS

    International Nuclear Information System (INIS)

    LUECK, K.J.

    2004-01-01

    This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, and summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation

  16. The research project KLIMAT. Report of carrot case study; Forskningsprosjektet KLIMAT. Rapport fra gulrot case studie

    Energy Technology Data Exchange (ETDEWEB)

    Svanes, Erik

    2012-07-01

    The research project 'KLIMAT' was 1.1.2009 to 31.8.2012. The main goal of this project was to develop a 'best practice' methodology for quantifying the carbon footprint of products with a focus on fruits, vegetables, dairy and meat products. The methodology was tested on six selected case products. One of these products was the carrot. The product was selected because it is a product with high sales volume, a large part of the production takes place in Norway, and it may be assumed to represent the root vegetables which are a very important group of vegetable products. Oestfold Research, in conjunction with BAMA and Gartnerhallen, collected the necessary data to conduct the study. Data came from a group of 13 producers with ties to Laagendalen that all products supplied to the Laagen Gulrot for processing and packing. The producers were voluntarily affiliated with an online reporting system for a variety of information, including information about resource use that were used in this study. Climate track of carrot packed in the cup was, according to the methodology that was developed 0.39 kg Co2-ekv/kg product delivered to the consumer, 0.44 kg Co2-ekv/kg consumed carrot. (Author)

  17. Defining Project Purchasing Activities - Exemplified by the Purchasing Practices in Offshore Wind Farm Projects

    DEFF Research Database (Denmark)

    Lutz, Salla

    and limited learning outcomes from one project to another. Furthermore, the study reveals the importance of a more holistic approach to project purchasing practices by focusing on the entire life cycle of a project. Managerially it helps selling companies to understand the peculiar buying phases...

  18. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  19. Developing Government Renewable Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  20. Youth's social network structures and peer influences: study protocol MyMovez project - Phase I.

    Science.gov (United States)

    Bevelander, Kirsten E; Smit, Crystal R; van Woudenberg, Thabo J; Buijs, Laura; Burk, William J; Buijzen, Moniek

    2018-04-16

    Youth are an important target group for social network interventions, because they are particularly susceptible to the adaptation of healthy and unhealthy habits and behaviors of others. They are surrounded by 'social influence agents' (i.e., role models such as family, friends and peers) that co-determine their dietary intake and physical activity. However, there is a lack of systematic and comprehensive research on the implementation of a social network approach in health campaigns. The MyMovez research project aims to fill this gap by developing a method for effective social network campaign implementation. This protocol paper describes the design and methods of Phase I of the MyMovez project, aiming to unravel youth's social network structures in combination with individual, psychosocial, and environmental factors related to energy intake and expenditure. In addition, the Wearable Lab is developed to enable an attractive and state-of-the-art way of collecting data and online campaign implementation via social networks. Phase I of the MyMovez project consists of a large-scale cross-sequential cohort study (N = 953; 8-12 and 12-15 y/o). In five waves during a 3-year period (2016-2018), data are collected about youth's social network exposure, media consumption, socialization experiences, psychological determinants of behavior, physical environment, dietary intake (snacking and drinking behavior) and physical activity using the Wearable Lab. The Wearable Lab exists of a smartphone-based research application (app) connected to an activity tracking bracelet, that is developed throughout the duration of the project. It generates peer- and self-reported (e.g., sociometric data and surveys) and experience sampling data, social network beacon data, real-time physical activity data (i.e., steps and cycling), location information, photos and chat conversation data from the app's social media platform Social Buzz. The MyMovez project - Phase I is an innovative cross

  1. OECD: Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    The work at the Project has continued in the two main fields: test fuel irradiation and fuel research, and computer based process supervision and control. Organizations participating in the Project continue to have their fuel irradiated in the Halden Reactor in instrumented test assemblies designed and manufactured by the Project. The Project's fuel studies continue to focus on specific subjects such as fuel pellet/cladding interaction and heat transfer, fission product release and fuel behavior under loss of coolant conditions. The work on process control and supervision continues in the highly relevant fields of core control and operator-process communication. A system for predictive core control is being developed while special mathematical methods for core power distribution control are being studied. Operator-process communication studies comprise use of computer simulation on colour display as important ingredients, while the work on developing a system for interactive plant disturbance analysis continues

  2. Oluvil Port Development Project

    DEFF Research Database (Denmark)

    Frigaard, Peter; Margheritini, Lucia

    Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during...... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...

  3. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  4. Trends in diabetes incidence from 1992 to 2015 and projections for 2024: A Portuguese General Practitioner's Network study.

    Science.gov (United States)

    de Sousa-Uva, Mafalda; Antunes, L; Nunes, B; Rodrigues, A P; Simões, J A; Ribeiro, R T; Boavida, J M; Matias-Dias, C

    2016-10-01

    Diabetes is known as a major cause of morbidity and mortality worldwide. Portugal is known as the European country with the highest prevalence of this disease. While diabetes prevalence data is updated annually in Portugal, the General Practitioner's (GP) Sentinel Network represents the only data source on diabetes incidence. This study describes the trends in Diabetes incidence, between 1992 and 2015, and estimate projections for the future incidence rates in Portugal until 2024. An ecological time-series study was conducted using data from GP Sentinel Network between 1992 and 2015. Family doctors reported all new cases of Diabetes in their patients' lists. Annual trends were estimated through Poisson regression models as well as the future incidence rates (until 2024), sex and age group stratified. Incidence rate projections were adjusted to the distribution of the resident Portuguese population given Statistics Portugal projections. The average increase in Diabetes incidence rate was in total 4.29% (CI95% 3.80-4.80) per year under study. Until 1998-2000, the annual incidence rate was higher in women, and from 1998-2000 to 2013-2015 turn out to be higher in men. The incidence rate projected for 2022-2024 was 972.77/10(5) inhabitants in total, and 846.74/10(5) and 1114.42/10(5), respectively, in women and men. This is the first study in Portugal to estimate diabetes incidence rate projections. The disturbing reported projections seem realistic if things continue as in the past. Actually, effective public health policies will need to be undertaken to minimize this alarming future scenario. Copyright © 2016 Primary Care Diabetes Europe. Published by Elsevier Ltd. All rights reserved.

  5. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  6. The Americleft Speech Project: A Training and Reliability Study.

    Science.gov (United States)

    Chapman, Kathy L; Baylis, Adriane; Trost-Cardamone, Judith; Cordero, Kelly Nett; Dixon, Angela; Dobbelsteyn, Cindy; Thurmes, Anna; Wilson, Kristina; Harding-Bell, Anne; Sweeney, Triona; Stoddard, Gregory; Sell, Debbie

    2016-01-01

    To describe the results of two reliability studies and to assess the effect of training on interrater reliability scores. The first study (1) examined interrater and intrarater reliability scores (weighted and unweighted kappas) and (2) compared interrater reliability scores before and after training on the use of the Cleft Audit Protocol for Speech-Augmented (CAPS-A) with British English-speaking children. The second study examined interrater and intrarater reliability on a modified version of the CAPS-A (CAPS-A Americleft Modification) with American and Canadian English-speaking children. Finally, comparisons were made between the interrater and intrarater reliability scores obtained for Study 1 and Study 2. The participants were speech-language pathologists from the Americleft Speech Project. In Study 1, interrater reliability scores improved for 6 of the 13 parameters following training on the CAPS-A protocol. Comparison of the reliability results for the two studies indicated lower scores for Study 2 compared with Study 1. However, this appeared to be an artifact of the kappa statistic that occurred due to insufficient variability in the reliability samples for Study 2. When percent agreement scores were also calculated, the ratings appeared similar across Study 1 and Study 2. The findings of this study suggested that improvements in interrater reliability could be obtained following a program of systematic training. However, improvements were not uniform across all parameters. Acceptable levels of reliability were achieved for those parameters most important for evaluation of velopharyngeal function.

  7. Study of blasting seismic effects of underground powerhouse of pumped storage project in granite condition

    Science.gov (United States)

    Wan, Sheng; Li, Hui

    2018-03-01

    Though the test of blasting vibration, the blasting seismic wave propagation laws in southern granite pumped storage power project are studied. Attenuation coefficient of seismic wave and factors coefficient are acquired by the method of least squares regression analysis according to Sadaovsky empirical formula, and the empirical formula of seismic wave is obtained. This paper mainly discusses on the test of blasting vibration and the procedure of calculation. Our practice might as well serve as a reference for similar projects to come.

  8. NEA international co-operative projects

    International Nuclear Information System (INIS)

    1989-01-01

    This text is consecrated at the international co-operative projects of the OECD Nuclear Energy Agency (NEA) in the field of reactor safety (Halden reactor project, Loft project, studies on the damaged Three Mile Island unit-2 reactor, inspection of reactor steel components, incident reporting system) and in the field of radioactive waste management (Stripa project, geochemical data bases, Alligator river project, seabed disposal of high-level radioactive waste, decommissioning of nuclear facilities)

  9. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  10. Teachers' response to the Punjab ICT education project: a case study

    OpenAIRE

    Kaur, Ramandeep

    2017-01-01

    Acknowledging the importance of digital technologies in education, the Government of India introduced the ICT in Schools Scheme in 2004 to improve the ICT skills of school students. Under this scheme, the government of Punjab state launched the ICT Education Project for computer education in 2005. This research study aims to explore the perceptions and practices of a small number of teachers in one government, rural girls’ senior secondary school in Punjab in relation to integration of IC...

  11. Mackenzie Gas Project : gas resource and supply study

    International Nuclear Information System (INIS)

    Harris, D.G.; Braaten, K.M.

    2004-01-01

    A study was conducted to assess the future gas supply for the Mackenzie Gas Project. The economically recoverable gas resources and deliverability in the region were assessed in order to support construction of the Mackenzie Valley pipeline and the associated gathering system. This supply study was based on a 25 year timeframe for resource development. Production forecasts were also prepared for 50 years following the date of the study. Natural gas forecasts for the general area to be served by the proposed pipeline were also presented. This report includes an introduction to the final gas resource and supply study as well as the regional geology relating to discovered and undiscovered resources. The following regions were included in the study area: onshore Mackenzie Delta including the Niglintgak, Parsons Lake and Taglu anchor fields; central Mackenzie Valley region extending from the Mackenzie Delta south to 63 degrees latitude; northern portion of the Yukon Territory; and, portions of the offshore Mackenzie Delta region limited to a water depth of 30 metres. Forecasts and economic analyses were prepared for the following 3 scenarios: contingent onshore resources only; contingent and prospective onshore resources; and, contingent and prospective onshore and offshore resources. Sensitivity forecasts were prepared for a fully expanded pipeline capacity of 1.8 bcf/day with an equal capacity gathering system. In addition, the National Energy Board estimates of resources for the 3 anchor field were used in place of the operator's estimates. A geological review was included for the plays in the study area. 15 refs., 43 tabs., 38 figs

  12. Pipeline politics—A study of India′s proposed cross border gas projects

    International Nuclear Information System (INIS)

    Nathan, Hippu Salk Kristle; Kulkarni, Sanket Sudhir; Ahuja, Dilip R.

    2013-01-01

    India′s energy situation is characterized by increasing energy demand, high fossil fuel dependency, large import shares, and significant portion of population deprived of modern energy services. At this juncture, natural gas, being the cleanest fossil fuel with high efficiency and cost effectiveness, is expected to play an important role. India, with only 0.6% of proven world reserves, is not endowed with adequate natural gas domestically. Nevertheless, there are gas reserves in neighbouring regions which gives rise to the prospects of three cross border gas pipeline projects, namely, Iran–Pakistan–India, Turkmenistan–Afghanistan–Pakistan–India, and Myanmar–Bangladesh–India. This study is a political analysis of these pipeline projects. First, it provides justification on use of natural gas and promotion of cross border energy trade. Then it examines these three pipeline projects and analyses the security concerns, role of different actors, their positions, shifting goals, and strategies. The study develops scenarios on the basis of changing circumstances and discusses some of the pertinent issues like technology options for underground/underwater pipelines and role of private players. It also explores impact of India′s broader foreign relations and role of SAARC on the future of pipelines and proposes energy induced mutually assured protection (MAP) as a concept for regional security. -- Highlights: •We justify the need for cross border energy trade through gas pipelines for India. •We examine prospective pipeline projects—IPI, TAPI, MBI and their security issues. •We develop scenarios and analyze role of actors, their positions, and strategies. •We discuss technology and policy options for realizing these gas pipelines. •We propose energy induced mutually assured protection (MAP) for regional security

  13. Chernobyl Studies Project - working group 7.0 environmental transport and health effects. Progress report, October 1993--January 1994

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, S.M. [ed.

    1994-03-01

    The DOE-funded Chernobyl Studies Project was begun as part of a cooperative agreement between the US and the former USSR, (quote) To develop jointly methods to project rapidly the health effects of any future reactor accident (quote). Most of the initial tasks for this project are completed or near completion. The focus has now turned primarily to the issue of health effects from the Chernobyl accident. Currently, we are extensively engaged in case-control and cohort studies of thyroid diseases among Belarussian children and in the Ukraine. A major part of the effort is providing methods and applications of dose reconstruction and providing support and equipment for the medical teams. This document contains reports on progress in the following task areas: Management; External Dose; Hydrological Transport; Chromosome Painting Dosimetry; Stochastic Effects; Thyroid Studies; and Leukemia Studies.

  14. Technology choice and CDM projects in China: case study of a small steel company in Shandong Province

    International Nuclear Information System (INIS)

    Kaneko, Shinji; Yonamine, Asaka; Jung, Tae Yong

    2006-01-01

    Corporate motives and strategies of both investing and hosting country affect the outcomes of a clean development mechanism (CDM) project-who introduces what technology to whom-and result in large differences in economic viability and the CO 2 emission reductions. This is particularly true for steel industry in which steel making consists of many detailed and complex processes, a given strategy could produce cumulative effects of the individual technologies used, leading to large energy savings overall. The objective of this study is to demonstrate some analytical methods that can be used to quantitatively evaluate the impacts of technology selection on the profit performance of CDM projects. Specifically, in this study we analyze a CDM project to introduce energy saving technology from Japan to a small steel manufacturer in China's Shandong Province, and conduct a simulation of the quantitative relationships between various technology options and profitability. Based on these results, we examine the environmental and economic significance of technology selection for CDM projects. To take this further, we then reconsider the profitability of a project as typical FDI activity (i.e., without the CDM), and by comparing this outcome with the CDM case, we clarify the significance and potential of the CDM

  15. Feasibility study on Bobovdol thermal power plant upgrading project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A survey has been made in relation with the improvement project intended of energy conservation, and reduction of global warming gas emission at the Bobovdol thermal power plant located in the suburb of Sofia, the capital of the Republic of Bulgaria. The existing Bobovdol power plant having a total capacity of 630 MW with three generators is a coal burning thermal power plant having been used already for 23 to 27 years, hence over-aged. The survey has discussed an improvement project of scrap-and-build type to make the plant a high-efficiency gas combined cycle power plant using gas turbines. The project calls for building 210-MW gas combined power generation facilities having 70-MW gas turbines, one each in three stages in 2007, 2012 and 2017. As a result of the discussions, the fuel consumption reducing rate was found to reach 37.99%, whereas the cumulative energy saving quantity in 41 years will reach 16.37 million tons of fuel oil equivalent. In addition, the reduction rate of global warming gas emission is 57.75%, and the cumulative reduction quantity in 41 years is 105.18 million tons. (NEDO)

  16. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  17. Human Genome Project

    Energy Technology Data Exchange (ETDEWEB)

    Block, S. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Cornwall, J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dally, W. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dyson, F. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Fortson, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Joyce, G. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Kimble, H. J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Lewis, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Max, C. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Prince, T. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Schwitters, R. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Weinberger, P. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Woodin, W. H. [The MITRE Corporation, McLean, VA (US). JASON Program Office

    1998-01-04

    The study reviews Department of Energy supported aspects of the United States Human Genome Project, the joint National Institutes of Health/Department of Energy program to characterize all human genetic material, to discover the set of human genes, and to render them accessible for further biological study. The study concentrates on issues of technology, quality assurance/control, and informatics relevant to current effort on the genome project and needs beyond it. Recommendations are presented on areas of the genome program that are of particular interest to and supported by the Department of Energy.

  18. 77 FR 12312 - Electronic Submission of Nonclinical Study Data; Notice of Pilot Project

    Science.gov (United States)

    2012-02-29

    ...] Electronic Submission of Nonclinical Study Data; Notice of Pilot Project AGENCY: Food and Drug Administration... and Research (CBER) is announcing an invitation to participate in a pilot evaluation program to test.... Participation in the pilot program is open to all sponsors. The pilot program is intended to provide industry...

  19. Collaborative Projects: A Study of Paired Work in a Malaysian University.

    Science.gov (United States)

    Holmes, Richard

    2003-01-01

    Examines the project work of university students in a TESOL (Teaching of English as a Second Language) program in Malaysia. Compares phonetics and phonology projects completed by students working in pairs with those completed by students alone and reports student attitudes and strategies. (Author/LRW)

  20. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  1. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  2. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  3. Software project management tools in global software development: a systematic mapping study.

    Science.gov (United States)

    Chadli, Saad Yasser; Idri, Ali; Ros, Joaquín Nicolás; Fernández-Alemán, José Luis; de Gea, Juan M Carrillo; Toval, Ambrosio

    2016-01-01

    Global software development (GSD) which is a growing trend in the software industry is characterized by a highly distributed environment. Performing software project management (SPM) in such conditions implies the need to overcome new limitations resulting from cultural, temporal and geographic separation. The aim of this research is to discover and classify the various tools mentioned in literature that provide GSD project managers with support and to identify in what way they support group interaction. A systematic mapping study has been performed by means of automatic searches in five sources. We have then synthesized the data extracted and presented the results of this study. A total of 102 tools were identified as being used in SPM activities in GSD. We have classified these tools, according to the software life cycle process on which they focus and how they support the 3C collaboration model (communication, coordination and cooperation). The majority of the tools found are standalone tools (77%). A small number of platforms (8%) also offer a set of interacting tools that cover the software development lifecycle. Results also indicate that SPM areas in GSD are not adequately supported by corresponding tools and deserve more attention from tool builders.

  4. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    -study, whereas the project study form is based on collaboration and dialogue. Consequently, successful implementation of project work in distance education requires extensive utilisation of new information and communication technology. In this paper the experiences of project work in a new Master of Industrial...... devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons...

  5. Numatron project

    Energy Technology Data Exchange (ETDEWEB)

    Sugimoto, K [Osaka Univ., Toyonaka (Japan). Dept. of Physics; Hirao, Yasuo

    1977-04-01

    A project of high energy heavy ion acceleration is under consideration. The high energy heavy ions can produce highly condensed states of nuclei. A new phase of nucleus would be seen at the incident energy higher than 140 MeV/nucleon. High energy heavy ions causing high density states and meson emission will produce various new nuclides. Process of formation of atomic elements will be studied. Various fields of science can be also investigated by the high energy heavy ions. Spectroscopic study of multi-valent ions will be made high energy uranium. Study of materials for the fusion reactor is important. Impurity heavy ion from the wall of the fusion reactor may lose the energy of the reactor, and the characteristic features of heavy ions should be investigated. The highly ionized states of atoms are also produced by heavy ion injection into material. Several projects of heavy ion acceleration are in progress in the world. The Numatron project in Japan is to construct a combination machine of a Cockcroft type machine, three linear accelerator and a synchrotron. The planned energy of the machine is 670 MeV/nucleon. Technical problems are under investigation.

  6. Project Management 2027; The Future of Project Management

    NARCIS (Netherlands)

    Drs. A.J.G. Silvius

    2008-01-01

    This paper describes a study into the expected development of the competences op the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  7. A general exact method for synthesizing parallel-beam projections from cone-beam projections via filtered backprojection

    International Nuclear Information System (INIS)

    Li Liang; Chen Zhiqiang; Xing Yuxiang; Zhang Li; Kang Kejun; Wang Ge

    2006-01-01

    In recent years, image reconstruction methods for cone-beam computed tomography (CT) have been extensively studied. However, few of these studies discussed computing parallel-beam projections from cone-beam projections. In this paper, we focus on the exact synthesis of complete or incomplete parallel-beam projections from cone-beam projections. First, an extended central slice theorem is described to establish a relationship between the Radon space and the Fourier space. Then, data sufficiency conditions are proposed for computing parallel-beam projection data from cone-beam data. Using these results, a general filtered backprojection algorithm is formulated that can exactly synthesize parallel-beam projection data from cone-beam projection data. As an example, we prove that parallel-beam projections can be exactly synthesized in an angular range in the case of circular cone-beam scanning. Interestingly, this angular range is larger than that derived in the Feldkamp reconstruction framework. Numerical experiments are performed in the circular scanning case to verify our method

  8. The Phebus FP project

    International Nuclear Information System (INIS)

    Delchambre, P.; Von der Hardt, P.

    1989-01-01

    This report summarizes the pre-project studies concerning the PHEBUS FP facility. After recalling the programme objectives, it describes the projected modifications to the PHEBUS reactor, outlines new installations and justifies the selected options

  9. Student ownership of projects in an upper-division optics laboratory course: A multiple case study of successful experiences

    Science.gov (United States)

    Dounas-Frazer, Dimitri R.; Stanley, Jacob T.; Lewandowski, H. J.

    2017-12-01

    We investigate students' sense of ownership of multiweek final projects in an upper-division optics lab course. Using a multiple case study approach, we describe three student projects in detail. Within-case analyses focused on identifying key issues in each project, and constructing chronological descriptions of those events. Cross-case analysis focused on identifying emergent themes with respect to five dimensions of project ownership: student agency, instructor mentorship, peer collaboration, interest and value, and affective responses. Our within- and cross-case analyses yielded three major findings. First, coupling division of labor with collective brainstorming can help balance student agency, instructor mentorship, and peer collaboration. Second, students' interest in the project and perceptions of its value can increase over time; initial student interest in the project topic is not a necessary condition for student ownership of the project. Third, student ownership is characterized by a wide range of emotions that fluctuate as students alternate between extended periods of struggle and moments of success while working on their projects. These findings not only extend the literature on student ownership into a new educational domain—namely, upper-division physics labs—they also have concrete implications for the design of experimental physics projects in courses for which student ownership is a desired learning outcome. We describe the course and projects in sufficient detail that others can adapt our results to their particular contexts.

  10. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  11. Zagreb Conference on English Contrastive Projects, 7-9 December 1970. Papers and Discussion. Studies 4. The Yugoslav Serbo-Croatian-English Contrastive Project.

    Science.gov (United States)

    Filipovic, Rudolf, Ed.

    The fourth volume in this series contains the papers presented at the Zagreb Conference on English Contrastive Projects. They are: "Recent Center Activities in Contrastive Linguistics," by William Nemser; "The Yugoslav Serbo-Croatian-English Contrastive Project So Far," by Rudolf Filipovic; "The Poznan Polish-English Contrastive Project," by Jacek…

  12. Non-financial analysis in project appraisal – an empirical study

    OpenAIRE

    Moutinho, Nuno; Lopes, MDS

    2011-01-01

    Recent literature has been emphasising the need to take both financial and nonfinancial aspects into consideration when considering capital budgeting decisions. This is to be done since the early stages of project appraisal, and not only when risks become reality. We wanted to know to what extent portuguese companies are aware of the importance of non financial aspects at their project appraisal processes, and, in their practices, what exactly they are doing and considering as more or less i...

  13. So many developers, so many projects: toward a motivation-based theory of project selection

    NARCIS (Netherlands)

    van Osch, W.; Adelaar, T.; Pith, M.

    2011-01-01

    Studies into open source software (OSS) development projects have hitherto focused on the question of why people aremotivated to contribute to these projects, thereby assuming that motivational factors are the same across all types of OSSprojects. In this study we challenge this assumption by

  14. The Veggie Project: a case study of a multi-component farmers' market intervention.

    Science.gov (United States)

    Freedman, Darcy A; Bell, Bethany A; Collins, Leslie V

    2011-08-01

    This case study provides an in-depth examination of process and feasibility factors associated with the development of a multi-component environmental intervention designed to increase access to fresh fruits and vegetables in four low-income, minority, urban communities with few healthy food retail outlets. The intervention, the Veggie Project, included three components: (a) onsite farmers' markets, (b) a Super Shopper voucher program, and (c) a Youth Leader Board. We analyzed receipts from sales transactions at the farmers' markets, close-ended surveys with participants, in-depth interviews with project stakeholders, and journal entries completed by youth participants. Thirty-four farmers' markets occurred, resulting in 1,101 sales transactions. Financial vouchers were used to purchased 63% of the produce. All of the youth Super Shoppers came to the market at least once and made significantly more purchase transactions than adults. The farmers' markets were never accessed by 38% of the adult Super Shoppers. The Veggie Project increased access to healthy foods, particularly among youth. More research is warranted to examine the relationship between market use and dietary behaviors as well as other factors (i.e., besides physical and economic) influencing food access among adults.

  15. Climate projections FAQ

    Science.gov (United States)

    A.E. Daniels; J.F. Morrison; L.A. Joyce; N.L. Crookston; S.C. Chen; S.G. McNulty

    2012-01-01

    Climate scenarios offer one way to identify and examine the land management challenges posed by climate change. Selecting projections, however, requires careful consideration of the natural resources under study, and where and how they are sensitive to climate. Selection also depends on the robustness of different projections for the resources and geographic area of...

  16. The Nordwrite Project.

    Science.gov (United States)

    Evensen, Lars, Sigfred

    A planned 3-year joint project of the Nordic research council for the humanities that focuses on writing development in school-age children is described. Four Nordic countries are involved in the project: Finland, Sweden, Norway, and Denmark. In the study, discourse-level performance analyses of student writing in English as a Second Language are…

  17. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  18. Sprays and Cartan projective connections

    Science.gov (United States)

    Saunders, D. J.

    2004-10-01

    Around 80 years ago, several authors (for instance H. Weyl, T.Y. Thomas, J. Douglas and J.H.C. Whitehead) studied the projective geometry of paths, using the methods of tensor calculus. The principal object of study was a spray, namely a homogeneous second-order differential equation, or more generally a projective equivalence class of sprays. At around the same time, E. Cartan studied the same topic from a different point of view, by imagining a projective space attached to a manifold, or, more generally, attached to a `manifold of elements'; the infinitesimal `glue' may be interpreted in modern language as a Cartan projective connection on a principal bundle. This paper describes the geometrical relationship between these two points of view.

  19. National Biomedical Tracer Facility: Project definition study

    International Nuclear Information System (INIS)

    Heaton, R.; Peterson, E.; Smith, P.

    1995-01-01

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPF to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design

  20. National Biomedical Tracer Facility: Project definition study

    Energy Technology Data Exchange (ETDEWEB)

    Heaton, R.; Peterson, E. [Los Alamos National Lab., NM (United States); Smith, P. [Smith (P.A.) Concepts and Designs (United States)

    1995-05-31

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPF to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design.