WorldWideScience

Sample records for superfund site remediation

  1. DECISION ANALYSIS OF INCINERATION COSTS IN SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This study examines the decision-making process of the remedial design (RD) phase of on-site incineration projects conducted at Superfund sites. Decisions made during RD affect the cost and schedule of remedial action (RA). Decision analysis techniques are used to determine the...

  2. Key Principles of Superfund Remedy Selection

    Science.gov (United States)

    Guidance on the primary considerations of remedy selection which are universally applicable at Superfund sites. Key guidance here include: Rules of Thumb for Superfund Remedy Selection and Role of the Baseline Risk Assessment.

  3. Assessment of technologies for the remediation of radioactively contaminated Superfund sites

    International Nuclear Information System (INIS)

    1990-01-01

    The report is a screening evaluation of information needs for the development of generic treatability studies for the remediation of Superfund Radiation Sites on the National Priorities List (NPL). It presents a categorization of the 25 radiation sites currently proposed or listed on the NPL, and provides a rating system for evaluating technologies that may be used to remediate these sites. It also identifies gaps in site assessment and technology data and provides information about and recommendations for technology development

  4. Case studies of community relations on DOE's Formerly Utilized Sites Remedial Action Program as models for Superfund sites

    International Nuclear Information System (INIS)

    Plant, S.W.; Adler, D.G.

    1995-01-01

    Ever since the US Department of Energy (DOE) created its Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974, there has been a community relations program. The community relations effort has grown as FUSRAP has grown. With 20 of 46 sites now cleaned up, considerable experience in working with FUSRAP stakeholders has been gained. Why not share that experience with others who labor on the Superfund sites? Many similarities exist between the Superfund sites and FUSRAP. FUSRAP is a large, multiple-site environmental restoration program. The challenges range from small sites requiring remedial actions measurable in weeks to major sites requiring the full remedial investigation/feasibility study process. The numerous Superfund sites throughout the United States offer the same diversity, both geographically and technically. But before DOE offers FUSRAP's community relations experience as a model, it needs to make clear that this will be a realistic model. As experiences are shared, DOE will certainly speak of the efforts that achieved its goals. But many of the problems that DOE encountered along the way will also be related. FUSRAP relies on a variety of one- and two-way communication techniques for involving stakeholders in the DOE decision-making process. Some of the techniques and experiences from the case studies are presented

  5. Superfund tio videos: Set A. Overview of superfund, response activities and responsibilities, site discovery, notification, and evaluation. Part 1. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into three sections. Section 1 discusses the development and framework of CERCLA and the Superfund Program and outlines the implementing rules that guide Superfund site cleanups. The Superfund response actions - remedial, removal, and enforcement - are reviewed. Section 2 outlines On-Scene Coordinator's (OSC) and Remedial Project Manager's (RPM) roles and responsibilities in Superfund removal, remedial, and enforcement activities. The other players involved in Superfund response activities also are identified. Section 3 describes how EPA learns of potential Superfund sites and lists the authorities that determine the requirements for site discovery. The procedures used to prioritize the sites and to identify and select sites for remediation are discussed

  6. Mining-Related Sediment and Soil Contamination in a Large Superfund Site: Characterization, Habitat Implications, and Remediation.

    Science.gov (United States)

    Juracek, K E; Drake, K D

    2016-10-01

    Historical mining activity (1850-1970) in the now inactive Tri-State Mining District provided an ongoing source of lead and zinc to the environment including the US Environmental Protection Agency Superfund site located in Cherokee County, southeast Kansas, USA. The resultant contamination adversely affected biota and caused human health problems and risks. Remediation in the Superfund site requires an understanding of the magnitude and extent of contamination. To provide some of the required information, a series of sediment and soil investigations were conducted in and near the Superfund site to characterize lead and zinc contamination in the aquatic and floodplain environments along the main-stem Spring River and its major tributaries. In the Superfund site, the most pronounced lead and zinc contamination, with concentrations that far exceed sediment quality guidelines associated with potential adverse biological effects, was measured for streambed sediments and floodplain soils located within or downstream from the most intensive mining-affected areas. Tributary streambeds and floodplains in affected areas are heavily contaminated with some sites having lead and zinc concentrations that are an order of magnitude (or more) greater than the sediment quality guidelines. For the main-stem Spring River, the streambed is contaminated but the floodplain is mostly uncontaminated. Measured lead and zinc concentrations in streambed sediments, lakebed sediments, and floodplain soils documented a persistence of the post-mining contamination on a decadal timescale. These results provide a basis for the prioritization, development, and implementation of plans to remediate contamination in the affected aquatic and floodplain environments within the Superfund site.

  7. Mining-related sediment and soil contamination in a large Superfund site: Characterization, habitat implications, and remediation

    Science.gov (United States)

    Juracek, Kyle E.; Drake, K. D.

    2016-01-01

    Historical mining activity (1850–1970) in the now inactive Tri-State Mining District provided an ongoing source of lead and zinc to the environment including the US Environmental Protection Agency Superfund site located in Cherokee County, southeast Kansas, USA. The resultant contamination adversely affected biota and caused human health problems and risks. Remediation in the Superfund site requires an understanding of the magnitude and extent of contamination. To provide some of the required information, a series of sediment and soil investigations were conducted in and near the Superfund site to characterize lead and zinc contamination in the aquatic and floodplain environments along the main-stem Spring River and its major tributaries. In the Superfund site, the most pronounced lead and zinc contamination, with concentrations that far exceed sediment quality guidelines associated with potential adverse biological effects, was measured for streambed sediments and floodplain soils located within or downstream from the most intensive mining-affected areas. Tributary streambeds and floodplains in affected areas are heavily contaminated with some sites having lead and zinc concentrations that are an order of magnitude (or more) greater than the sediment quality guidelines. For the main-stem Spring River, the streambed is contaminated but the floodplain is mostly uncontaminated. Measured lead and zinc concentrations in streambed sediments, lakebed sediments, and floodplain soils documented a persistence of the post-mining contamination on a decadal timescale. These results provide a basis for the prioritization, development, and implementation of plans to remediate contamination in the affected aquatic and floodplain environments within the Superfund site.

  8. Alternating current electrocoagulation for Superfund site remediation

    International Nuclear Information System (INIS)

    Farrell, C.W.

    1991-01-01

    A study is being conducted by Electro-Pure Systems, Inc. (EPS) under the Emerging Technology portion of the U.S. Environmental Protection Agency's (EPA's) Superfund Innovative Technology Evaluation (SITE) Program to study alternating current electrocoagulation for Superfund site remediation. Alternating current electrocoagulation has proven to be effective in agglomerating and removing colloidal solids, metals and certain organic contaminants from surrogate soils prepared from the US EPA's Synthetic Soil Matrix. Treatments under a wide range of operating conditions have enabled the optimum parameter settings to be established for multiple phase separation. Electrocoagulation enables appreciably enhanced filtration and dewatering rates to be realized for metals- and diesel fuel-spiked surrogate soil slurries; such enhancements are prompted by growth in the mean particle size of the clays and particulates from typically < 10 microns to as much as 150 microns depending on the degree of electrocoagulation. Reduction in the total suspended solids content of clays in all slurries in excess of 90% can routinely be achieved. Bench-scale experiments of the metals-spiked surrogate soils indicate that electrocoagulation preferentially concentrates soluble metals into the sludge phase; excellent metals separation (Pb, Cr, Cu, Cd) can be realized. Experiments on surrogate wastes spiked with volatile organics suggest that this technology is not capable of effecting good volatile extractions from the aqueous phase. Reductions in excess of 80% in the total organic carbon (TOC) content of the diesel fuel-spiked surrogates can, however, be achieved

  9. Remedial design services for Montclair/West Orange and Glen Ridge Superfund sites

    International Nuclear Information System (INIS)

    Urbaniak, T.F.; Tomiczek, P.W. Jr.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites are located 12 miles west of New York City in Essex County, New Jersey. The sites are contaminated with waste materials from radium-processing facilities which operated in the area during the early 1900's. The waste materials, containing radium and other radioactive isotopes were placed in three separate landfill sites. Major public health risks are indoor radon gas build-up and indoor/ outdoor gamma radiation. In 1989, the EPA issued a Record of Decision (ROD) which chose excavation and off-site disposal of material as the preferred alternative. The purpose of this presentation is to highlight key elements of the design process for the remedial action at Montclair. Those key elements are as follows: meeting community relations challenges; measuring radioactive contamination; developing plans and specifications; packaging of remedial action contacts; and continually improving both the process and the designs

  10. Remediation of the Wells G & H Superfund Site, Woburn, Massachusetts.

    Science.gov (United States)

    Bair, E Scott; Metheny, Maura A

    2002-01-01

    Remediation of ground water and soil contamination at the Wells G & H Superfund Site, Woburn, Massachusetts, uses technologies that reflect differences in hydrogeologic settings, concentrations of volatile organic compounds (VOCs), and costs of treatment. The poorly permeable glacial materials that overlie fractured bedrock at the W.R. Grace property necessitate use of closely spaced recovery wells. Contaminated ground water is treated with hydrogen peroxide and ultraviolet (UV) oxidation. At UniFirst, a deep well completed in fractured bedrock removes contaminated ground water, which is treated by hydrogen peroxide, UV oxidation, and granular activated carbon (GAC). The remediation system at Wildwood integrates air sparging, soil-vapor extraction, and ground water pumping. Air stripping and GAC are used to treat contaminated water; GAC is used to treat contaminated air. New England Plastics (NEP) uses air sparging and soil-vapor extraction to remove VOCs from the unsaturated zone and shallow ground water. Contaminated air and water are treated using separate GAC systems. After nine years of operation at W.R. Grace and UniFirst, 30 and 786 kg, respectively, of VOCs have been removed. In three years of operation, 866 kg of VOCs have been removed at Wildwood. In 15 months of operation, 36 kg of VOCs were removed at NEP. Characterization work continues at the Olympia Nominee Trust, Whitney Barrel, Murphy Waste Oil, and Aberjona Auto Parts properties. Risk assessments are being finalized that address heavy metals in the floodplain sediments along the Aberjona River that are mobilized from the Industri-Plex Superfund Site located a few miles upstream.

  11. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  12. Feasibility study for the United Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    Lincoff, A.H. [US Environmental Protection Agency, San Francisco, CA (United States). Region IX; Costan, G.P.; Montgomery, M.S.; White, P.J. [Pacific Northwest Lab., Richland, WA (United States)

    1994-07-01

    The United Heckathom Superfund Site in Richmond, California, was used to formulate pesticides from approximately 1947 to 1966. Soils at the site and sediments in the harbor were contaminated with various chlorinated pesticides, primarily DDT, as a result of these activities. The US Environmental Protection Agency listed the site on the Superfund National Priorities List in 1990. This document is part of the Remedial Investigation and Feasibility Study phase of the Superfund response, which will provide the basis for selection of a final remedy that will protect human health and the environment and achieve compliance with federal and state envirorunental laws.

  13. Feasibility study for the United Heckathorn Superfund Site, Richmond, California

    International Nuclear Information System (INIS)

    Lincoff, A.H.

    1994-07-01

    The United Heckathom Superfund Site in Richmond, California, was used to formulate pesticides from approximately 1947 to 1966. Soils at the site and sediments in the harbor were contaminated with various chlorinated pesticides, primarily DDT, as a result of these activities. The US Environmental Protection Agency listed the site on the Superfund National Priorities List in 1990. This document is part of the Remedial Investigation and Feasibility Study phase of the Superfund response, which will provide the basis for selection of a final remedy that will protect human health and the environment and achieve compliance with federal and state envirorunental laws

  14. Remediation System Evaluation, McCormick and Baxter Superfund SiteRemediation System Evaluation, McCormick and Baxter Superfund Site

    Science.gov (United States)

    The McCormick and Baxter Creosoting Company, Portland Plant, Superfund Site is located adjacent tothe Willamette River in Portland, Oregon and addresses contamination of soil, groundwater, and riversediments stemming from creosoting operations...

  15. Long-Term Groundwater Monitoring Optimization, Clare Water Supply Superfund Site, Permeable Reactive Barrier and Soil Remedy Areas, Clare, Michigan

    Science.gov (United States)

    This report contains a review of the long-term groundwater monitoring network for the Permeable Reactive Barrier (PRB) and Soil Remedy Areas at the Clare Water Supply Superfund Site in Clare, Michigan.

  16. Stakeholder views of superfund sites

    International Nuclear Information System (INIS)

    English, M.R.

    1992-01-01

    Nearly ten years have passed since the enactment of the federal Comprehensive Response, Compensation, and Liability Act (CERCLA), usually referred to as open-quotes Superfundclose quotes. Nearly four years have passed since CERCLA's major overhaul through the Superfund Amendments and Reauthorization Act (SARA). Although much still remains to be done under Superfund, there is now enough experience to assess how effectively it is working. A study being undertaken by the University of Tennessee's Waste Management Research and Education Institute will supply a portion of that assessment. The study was completed in the fall of 1990. Our study examines two related issues: the resources that will be needed in the coming years to fulfill the mandate of Superfund and other hazardous waste remediation programs, and the site-level experience to date in implementing CERCLA and SARA. This chapter discusses only the open-quotes site-level experienceclose quotes effort, and only its methodological approach. The purpose of the open-quotes site-level experienceclose quotes effort is to explore what counts as a open-quotes successfulclose quotes site in the eyes of different stakeholders in a Superfund cleanup - e.g., the affected community, the potentially responsible parties (PRPs), state and local officials, and the US Environmental Protection Agency (EPA)

  17. Remediation System Evaluation, Douglas Road Landfill Superfund Site

    Science.gov (United States)

    The Douglas Road Landfill Superfund Site is located in St. Joseph County just north of Mishawaka,Indiana. The site consists of a 16-acre capped landfill located on an approximately 32-acre lot (includingthe land purchased in 1999 for a wetlands...

  18. On using residual risk to assess the cost effectiveness and health protectiveness of remedy selection at superfund sites

    International Nuclear Information System (INIS)

    Katsumata, Peter T.; Kastenberg, William E.

    1998-01-01

    This article examines the importance of determining residual risk and its impact on remedy selection at Superfund Sites. Within this examination, risks are assessed using probabilistic models that incorporate the uncertainty and variability of the input parameters, and utilize parameter distributions based on current and applicable site-specific data. Monte Carlo methods are used to propagate these uncertainties and variabilities through the risk calculations resulting in a distribution for the estimate of both risk and residual risk. Such an approach permits an informed decision based on a broad information base which involves considering the entire uncertainty distribution of risk rather than a point estimate for each exposure scenario. Using the probabilistic risk estimates, with current and applicable site-specific data, alternative decisions regarding cleanup are obtained for two Superfund Sites

  19. Regional economic impact assessment: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Harrison, David; Coughlin, Conor; Hogan, Dylan; Edwards, Deborah A; Smith, Benjamin C

    2018-01-01

    The present paper describes a methodology for evaluating impacts of Superfund remedial alternatives on the regional economy in the context of a broader sustainability evaluation. Although economic impact methodology is well established, some applications to Superfund remedial evaluation have created confusion because of seemingly contradictory results. This confusion arises from failure to be explicit about 2 opposing impacts of remediation expenditures: 1) positive regional impacts of spending additional money in the region and 2) negative regional impacts of the need to pay for the expenditures (and thus forgo other expenditures in the region). The present paper provides a template for economic impact assessment that takes both positive and negative impacts into account, thus providing comprehensive estimates of net impacts. The paper also provides a strategy for identifying and estimating major uncertainties in the net impacts. The recommended methodology was applied at the Portland Harbor Superfund Site, located along the Lower Willamette River in Portland, Oregon, USA. The US Environmental Protection Agency (USEPA) developed remedial alternatives that it estimated would cost up to several billion dollars, with construction durations possibly lasting decades. The economic study estimated regional economic impacts-measured in terms of gross regional product (GRP), personal income, population, and employment-for 5 of the USEPA alternatives relative to the "no further action" alternative. Integr Environ Assess Manag 2018;14:32-42. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  20. Superfund fact sheet: The remedial program. Fact sheet

    International Nuclear Information System (INIS)

    1992-09-01

    The fact sheet describes what various actions the EPA can take to clean up hazardous wastes sites. Explanations of how the criteria for environmental and public health risk assessment are determined and the role of state and local governments in site remediation are given. The fact sheet is one in a series providing reference information about Superfund issues and is intended for readers with no formal scientific training

  1. Strategy to Ensure Institutional Control Implementation at Superfund Sites

    Science.gov (United States)

    This document sets forth EPA’s strategy (Strategy) for ensuring that institutional controls (ICs) are successfully implemented at Superfund sites, with an emphasis on evaluating ICs at sites where all construction of all remedies is complete (construction complete sites).

  2. Restoration principles and criteria: superfund program policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Walker, Stuart

    2006-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) is responsible for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund'. The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund program. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in a consistent manner as with chemical contamination, except to account for the technical differences between radionuclides and chemicals. This consistency is important since at every radioactively contaminated site being addressed under Superfund's primary program for long-term cleanup, the National Priorities List (NPL), chemical contamination is also present. (author)

  3. Superfund Sites

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This layer represents active Superfund Sites published by the Environmental Protection Agency (EPA). These data were extracted from the Superfund Enterprise...

  4. U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites

    International Nuclear Information System (INIS)

    Carey, Pat; Walker, Stuart

    2008-01-01

    This paper describes the Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities. The Environmental Protection Agency (EPA) implements the Superfund program under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA). From the beginning of the Superfund program, Congress envisioned a role for communities. This role has evolved and expanded during the implementation of the Superfund program. Initially, the CERCLA statute had community involvement requirements designed to inform surrounding communities of the work being done at a site. CERCLA's provisions required 1) development of a community relations plan for each site, 2) establishment of information repositories near each site where all publicly available materials related to the site would be accessible for public inspection, 3) opportunities for the public to comment on the proposed remedy for each site and 4) development of a responsiveness summary responding to all significant comments received on the proposed remedy. In recognition of the need for people living near Superfund sites to be well-informed and involved with decisions concerning sites in their communities, SARA expanded Superfund's community involvement activities in 1986. SARA provided the authority to award Technical Assistance Grants (TAGs) to local communities enabling them to hire independent technical advisors to assist them in understanding technical issues and data about the site. The Superfund Community Involvement Program has sought to effectively implement the statutory community involvement requirements, and to go beyond those requirements to find meaningful ways to involve citizens in the cleanup of sites in their communities. We've structured our program around

  5. Remediation System Evaluation, Savage Municipal Water Supply Superfund Site (PDF)

    Science.gov (United States)

    The Savage Municipal Water Supply Superfund Site, located on the western edge of Milford, New Hampshire, consists of a source area and an extended plume that is approximately 6,000 feet long and 2,500 feet wide.

  6. Restoration principles and criteria: Superfund programme policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Shapiro, M.

    2000-01-01

    The Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response is responsible for implementing two key US laws regulating waste management and cleanup: the Resource Conservation and Recovery Act, and the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed ''Superfund''. The purpose of the Superfund programme is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund programme. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in the identical way as chemical contamination. (author)

  7. Diffusive flux of PAHs across sediment-water and water-air interfaces at urban superfund sites.

    Science.gov (United States)

    Minick, D James; Anderson, Kim A

    2017-09-01

    Superfund sites may be a source of polycyclic aromatic hydrocarbons (PAHs) to the surrounding environment. These sites can also act as PAH sinks from present-day anthropogenic activities, especially in urban locations. Understanding PAH transport across environmental compartments helps to define the relative contributions of these sources and is therefore important for informing remedial and management decisions. In the present study, paired passive samplers were co-deployed at sediment-water and water-air interfaces within the Portland Harbor Superfund Site and the McCormick and Baxter Superfund Site. These sites, located along the Willamette River (Portland, OR, USA), have PAH contamination from both legacy and modern sources. Diffusive flux calculations indicate that the Willamette River acts predominantly as a sink for low molecular weight PAHs from both the sediment and the air. The sediment was also predominantly a source of 4- and 5-ring PAHs to the river, and the river was a source of these same PAHs to the air, indicating that legacy pollution may be contributing to PAH exposure for residents of the Portland urban center. At the remediated McCormick and Baxter Superfund Site, flux measurements highlight locations within the sand and rock sediment cap where contaminant breakthrough is occurring. Environ Toxicol Chem 2017;36:2281-2289. © 2017 SETAC. © 2017 SETAC.

  8. Technology needs and trends for hazardous waste site remediation

    International Nuclear Information System (INIS)

    Kovalick, W.W. Jr.

    1995-01-01

    Over the next few decades, federal, state, and local governments and private industry will commit billions of dollars annually to clean up sites contaminated with hazardous waste and petroleum products. While these needs represent an obligation for society, they also represent an important business opportunity for vendors of remediation services. This presentation assesses the remediation market by characterizing sites that comprise the demand for cleanup services, observing remedy selection trends in the Superfund program, and discussing gaps in the supply of technologies

  9. Superfund Record of Decision (EPA region 2): Glen Ridge Radium site, Essex County, NJ. (Second remedial action), June 1990. Final report

    International Nuclear Information System (INIS)

    1990-01-01

    The 90-acre Glen Ridge Radium site is a residential community in the Borough of Glen Ridge, Essex County, New Jersey. The site is adjacent to another Superfund site, the Montclair/West Orange site. The Glen Ridge site includes a community of 274 properties serviced by surface reservoirs in northern New Jersey. In the early 1900s, a radium processing or utilization facility was located in the vicinity of the site. EPA investigations in 1981 and 1983 confirmed the presence of gamma radiation contamination in the Glen Ridge area and in several adjacent houses. The ROD complements the previous 1989 ROD for this site and provides a final remedy. The primary contaminant of concern affecting the soil is radium 226

  10. Remediation System Evaluation, Tutu Wellfield Superfund Site, St. Thomas, U.S. Virgin Islands

    Science.gov (United States)

    The Tutu Wellfield Superfund Site is a 1.5 square mile site located on the eastern end of St. Thomas, U.S. Virgin Islands (USVI) within the upper Turpentine Run surface drainage basin in the Anna’s Retreat area.

  11. Application of probabilistic risk assessment: Evaluating remedial alternatives at the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Ruffle, Betsy; Henderson, James; Murphy-Hagan, Clare; Kirkwood, Gemma; Wolf, Frederick; Edwards, Deborah A

    2018-01-01

    A probabilistic risk assessment (PRA) was performed to evaluate the range of potential baseline and postremedy health risks to fish consumers at the Portland Harbor Superfund Site (the "Site"). The analysis focused on risks of consuming fish resident to the Site containing polychlorinated biphenyls (PCBs), given that this exposure scenario and contaminant are the primary basis for US Environmental Protection Agency's (USEPA's) selected remedy per the January 2017 Record of Decision (ROD). The PRA used probability distributions fit to the same data sets used in the deterministic baseline human health risk assessment (BHHRA) as well as recent sediment and fish tissue data to evaluate the range and likelihood of current baseline cancer risks and noncancer hazards for anglers. Areas of elevated PCBs in sediment were identified on the basis of a geospatial evaluation of the surface sediment data, and the ranges of risks and hazards associated with pre- and postremedy conditions were calculated. The analysis showed that less active remediation (targeted to areas with the highest concentrations) compared to the remedial alternative selected by USEPA in the ROD can achieve USEPA's interim risk management benchmarks (cancer risk of 10 -4 and noncancer hazard index [HI] of 10) immediately postremediation for the vast majority of subsistence anglers that consume smallmouth bass (SMB) fillet tissue. In addition, the same targeted remedy achieves USEPA's long-term benchmarks (10 -5 and HI of 1) for the majority of recreational anglers. Additional sediment remediation would result in negligible additional risk reduction due to the influence of background. The PRA approach applied here provides a simple but adaptive framework for analysis of risks and remedial options focused on variability in exposures. It can be updated and refined with new data to evaluate and reduce uncertainty, improve understanding of the Site and target populations, and foster informed remedial decision

  12. Superfund record of decision (EPA Region 7): Cherokee County Superfund Site, Cherokee County, KS, July 29, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The decision document presents the selected remedial action for the mining wastes at Operable Unit No. 07 of the Galena Subsite, which is part of the Cherokee County Superfund Site in Cherokee County, Kansas. The selected remedy includes actions for residential soils impacted by mining wastes and includes: Excavation and disposal of residential soils impacted by mining wastes; Health education for the general community and medical professionals; Institutional controls to guide future development in residential areas impacted by mining wastes; Treatability studies to evaluate the effectiveness of phosphate stabilization as a future alternative; and Operation and maintenance of all remedy aspects including, but not limited to, health education, institutional controls, and long-term monitoring.

  13. A strategy for end point criteria for Superfund remediation

    International Nuclear Information System (INIS)

    Hwang, S.T.

    1992-06-01

    Since the inception of cleanup for hazardous waste sites, estimating target cleanup levels has been the subject of considerable investigation and debate in the Superfund remediation process. Establishing formal procedures for assessing human health risks associated with hazardous waste sites has provided a conceptual framework for determining remediation goals and target cleanup levels (TCLs) based on human health and ecological risk consideration. This approach was once considered at variance with the concept of the pre-risk assessment period; that is, cleaning up to the background level, or using containment design or best available control technologies. The concept has been gradually adopted by the regulatory agencies and the parties responsible for cleanup. Evaluation of cleanup strategies at the outset of the planning stage will eventually benefit the parties responsible for cleanup and the oversight organizations, including regulatory agencies. Development of the strategies will provide an opportunity to promote an improvement in the pace and quality of many activities to be carried out. The strategies should help address the issues related to (1) improving remediation management activities to arrive at remediation as expeditiously as possible, (2) developing alternate remediation management activities, (3) identifying obstructing issues to management for resolution, (4) adapting the existing framework to correspond to the change in remediation statutes and guidelines, and (5) providing the basis for evaluating options for the record of decision process. This paper will discuss some of the issues and the research efforts that were addressed as part of the strategies requiring future discussion and comment

  14. EPA RREL's mobile volume reduction unit advances soil washing at four Superfund sites

    International Nuclear Information System (INIS)

    Gaire, R.; Borst, M.

    1994-01-01

    Research testing of the US. Environmental Protection Agency (EPA) Risk Reduction Engineering Laboratory's (RREL) Volume Reduction Unit (VRU), produced data helping advance soil washing as a remedial technology for contaminated soils. Based on research at four Superfund sites, each with a different matrix of organic contaminants, EPA evaluated the soil technology and provided information to forecast realistic, full-scale remediation costs. Primarily a research tool, the VRU is RREL's mobile test unit for investigating the breadth of this technology. During a Superfund Innovative Technology Evaluation (SITE) Demonstration at Escambia Wood Treating Company Site, Pensacola, FL, the VRU treated soil contaminated with pentachlorophenol (PCP) and polynuclear aromatic hydrocarbon-laden creosote (PAH). At Montana Pole and Treatment Plant Site, Butte, MT, the VRU treated soil containing PCP mixed with diesel oil (measured as total petroleum hydrocarbons) and a trace of dioxin. At Dover Air Force Base Site, Dover, DE, the VRU treated soil containing JP-4 jet fuel, measured as TPHC. At Sand Creek Site, Commerce City, CO, the feed soil at this site was contaminated with two pesticides: heptachlor and dieldrin. Less than 10 percent of these pesticides remained in the treated coarse soil fractions

  15. 76 FR 20287 - Superfund Site, New Bedford Harbor, New Bedford, MA: Anchorage Ground and Regulated Navigation Area

    Science.gov (United States)

    2011-04-12

    ... may lead to the discovery of a significant environmental impact from this proposed rule. List of... engaged in activities associated with remediation efforts in the New Bedford Harbor Superfund Site... activity can be performed without undue risk to environmental remediation efforts. Requests for waivers...

  16. Assessment of international remedial technologies for application to Superfund sites

    International Nuclear Information System (INIS)

    Sanning, D.E.

    1990-01-01

    This paper presents some of the logical arguments for conducting research on remedial technologies for contaminated land and groundwater at an international level. It gives information on many of the international organizations that are involved in environmental programs, but it especially gives emphasis to the NATO-CCMS pilot study on Demonstration of Remedial Action Technologies for Contaminated Land and Groundwater. The purpose of the study is to field demonstrate and evaluate new/innovative technologies for remedial action at uncontrolled hazardous waste sites. This study is a logical international extension of the US EPA SITE program. It offers the opportunity to obtain a multiple data base on various remedial action unit processes without any single country having to commit a disproportionate amount of its internal resources to any specific activity. Each participating country provides the necessary resources for those demonstrations which they are contributing to the study. Sites are selected by a majority vote of all participating countries (no country is permitted to vote for its own sites). The study is a 5 year program with participants from Canada, Denmark, Federal Republic of Germany, France, Greece, Italy, Japan, the Netherlands, Norway, Spain, and the US. The need for cost-effective remedial action technologies for hazardous waste sites is a problem of all industrialized countries. The need to build a knowledge base of emerging remedial technologies was the impetus behind the USEPA's lead role and commitment to this pilot study

  17. U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites

    International Nuclear Information System (INIS)

    Martin, K.; Walker, St.

    2009-01-01

    This paper describes the EPA Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities, and what lessons have been learned by EPA when trying to conduct meaningful community involvement at sites. In addition, it discusses tools that EPA has designed to specifically enhance community involvement at radioactively contaminated Superfund sites. In summary, the Superfund program devotes substantial resources to involving the local community in the site cleanup decision making process. We believe community involvement provides us with highly valuable information that must be available to carefully consider remedial alternatives at a site. We also find our employees enjoy their jobs more. Rather than fighting with an angry public they can work collaboratively to solve the problems created by the hazardous waste sites. We have learned the time and resources we devote at the beginning of a project to developing relationships with the local community, and learning about their issues and concerns is time and resources well spent. We believe the evidence shows this up-front investment helps us make better cleanup decisions, and avoids last minute efforts to work with a hostile community who feels left out of the decision-making process. (authors)

  18. Superfund Site Information

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes a number of individual data sets related to site-specific information for Superfund, which is governed under the Comprehensive Environmental...

  19. Stakeholder value-linked sustainability assessment: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Apitz, Sabine E; Fitzpatrick, Anne G; McNally, Amanda; Harrison, David; Coughlin, Conor; Edwards, Deborah A

    2018-01-01

    Regulatory decisions on remediation should consider affected communities' needs and values, and how these might be impacted by remedial options; this process requires that diverse stakeholders are able to engage in a transparent consideration of value trade-offs and of the distribution of risks and benefits associated with remedial actions and outcomes. The Stakeholder Values Assessment (SVA) tool was developed to evaluate remedial impacts on environmental quality, economic viability, and social equity in the context of stakeholder values and priorities. Stakeholder values were linked to the pillars of sustainability and also to a range of metrics to evaluate how sediment remediation affects these values. Sediment remedial alternatives proposed by the US Environmental Protection Agency (USEPA) for the Portland Harbor Superfund Site were scored for each metric, based upon data provided in published feasibility study (FS) documents. Metric scores were aggregated to generate scores for each value; these were then aggregated to generate scores for each pillar of sustainability. In parallel, the inferred priorities (in terms of regional remediation, restoration, planning, and development) of diverse stakeholder groups (SGs) were used to evaluate the sensitivity and robustness of the values-based sustainability assessment to diverse SG priorities. This approach, which addresses social indicators of impact and then integrates them with indicators of environmental and economic impacts, goes well beyond the Comprehensive Environmental Response, Compensation and Liability Act's (CERCLA) 9 criteria for evaluating remedial alternatives because it evaluates how remedial alternatives might be ranked in terms of the diverse values and priorities of stakeholders. This approach identified trade-offs and points of potential contention, providing a systematic, semiquantitative, transparent valuation tool that can be used in community engagement. Integr Environ Assess Manag 2018

  20. EXPERIENCE IN INCINERATION APPLICABLE TO SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This document can be used as a reference tool for hazardous waste site remediation where incineration is used as a treatment alternative. It provides the user with information garnered from the experiences of others who use incineration. The document presents useful lessons in ev...

  1. Report: Remedial Project Manager Turnover at Superfund Sites

    Science.gov (United States)

    Report #2001-M-000015, June 15, 2001. We determined that EPA Region III did not have formal procedures in place to mitigate continuity problems caused by turnover of EPA personnel in the Superfund program.

  2. Superfund Site Information - Site Sampling Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes Superfund site-specific sampling information including location of samples, types of samples, and analytical chemistry characteristics of...

  3. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — National Priorities List (NPL) Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access...

  4. Post-remediation biomonitoring of pesticides and other contaminants in marine waters and sediment near the United Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    LD Antrim; NP Kohn

    2000-05-26

    Marine sediment remediation at the United Heckathorn Superfund Site was completed in April 1997. Water and mussel tissues were sampled in February 1999 from four stations near Lauritzen Canal in Richmond, California, for Year 2 of post-remediation monitoring of marine areas near the United Heckathorn Site. Dieldrin and dichlorodiphenyl trichloroethane (DDT) were analyzed in water samples, tissue samples from resident mussels, and tissue samples from transplanted mussels deployed for 4 months. Concentrations of dieldrin and total DDT in water and total DDT in tissue were compared with Year 1 of post-remediation monitoring, and with preremediation data from the California State Mussel Watch program (tissues) and the Ecological Risk Assessment for the United Heckathorn Superfund Site (tissues and water). Mussel tissues were also analyzed for polychlorinated biphenyls (PCB), which were detected in sediment samples. Chlorinated pesticide concentrations in water samples were similar to preremediation levels and did not meet remediation goals. Mean dieidrin concentrations in water ranged from 0.62 rig/L to 12.5 ng/L and were higher than the remediation goal (0.14 ng/L) at all stations. Mean total DDT concentrations in water ranged from 14.4 ng/L to 62.3 ng/L and exceeded the remediation goal (0.59 ng/L) at all stations. The highest concentrations of both pesticides were found at the Lauritzen Canal/End station. Despite exceedence of the remediation goals, chlorinated pesticide concentrations in Lauritzen Canal water samples were notably lower in 1999 than in 1998. Tissue samples from biomonitoring organisms (mussels) provide an indication of the longer-term integrated exposure to contaminants in the water column, which overcomes the limitations of grab samples of water. Biomonitoring results indicated that the bioavailability of chlorinated pesticides has been reduced from preremediation levels both in the dredged area and throughout Richmond Harbor. Total DDT and

  5. In-situ stabilization of the Geiger (C and M Oil) Superfund Site

    International Nuclear Information System (INIS)

    Andromalos, K.B.; Ameel, M.E.

    1994-01-01

    The Geiger (C and M Oil) Superfund Site is the first US Army Corps of Engineers managed soil remediation project which utilized the in-situ stabilization/solidification technique to remediate the soil. This project involved the remediation of approximately 23,000 cubic yards of contaminated soil. Contaminants of concern included chromium, lead, PCB'S, toluene, benzene, and other organic compounds. Clean-up criteria for the stabilized material was equal to the National Primary Drinking Water Regulations, when tested using the TCLP leachate extraction method. Chromium, lead, and toluene were the main contaminants of concern, with TCLP clean-up goals of 150, 15 and 1,000 parts per billion (ppb), respectively. This National Priorities List (NPL) site is located near Charleston, SC and was an abandoned old waste oil facility that utilized unlined shallow trenches for the storage of waste oil. This paper summarizes the initial testing programs and the final production work at the site. Extensive testing was performed throughout all phases of the project. This testing was performed for the purpose of mix optimization, quality assurance, and verification testing. Specific parameters tested included: TCLP testing of organics, metals and PCBs, permeability testing, and unconfirmed compression strength

  6. Chemical dechlorination of pesticides at a superfund site in Region II

    International Nuclear Information System (INIS)

    Pendergrass, S.; Prince, J.

    1991-01-01

    Selecting technologies for cleaning up hazardous waste sites is a complex task, due in part to the rapidly changing nature of the state-of-the-art in technology. There is strong support for use of innovative technologies as specified in Section 121(b) of CERCLA. However, use of an innovative technology requires overcoming a variety of challenges. These challenges include: Screening potentially appropriate technologies, including innovative technologies, and selecting one or more potential innovative technologies for which preliminary results are promising; however, site-specific data are needed prior to technology evaluation. Evaluating the effectiveness of the proposed technology for the site through the use of treatability studies. Gaining acceptance for the innovative technology, which may employ new or unfamiliar concepts. Determining optimal design and operating parameters for full-scale remediation. This paper discusses the technology evaluation process and how that process supported the selection of an innovative technology for the Myers Property site, a Superfund site in Region II. A case study is presented showing how technology screening and laboratory treatability studies were used to evaluate an innovative technology (chemical dechlorination), which was selected as the technology for remediation of soils and sediments contaminated with pesticides at this environmentally sensitive site in New Jersey. The remedy selected by the U.S. EPA for this site designates chemical dechlorination as the selected technology, but does not specify any particular vendor or process. Rather, the remedy sets forth technology performance standards and recommends certain design tasks which may be used to select a particular chemical process. This paper discusses he of these design tasks as they might apply to innovative technologies, using chemical dechlorination as a model

  7. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - Non-NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Non-NPL Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a...

  8. Superfund Green Remediation

    Science.gov (United States)

    Green remediation is the practice of considering all environmental effects of site cleanup and incorporating options – like the use of renewable energy resources – to maximize the environmental benefits of cleanups.

  9. Chromosomal aberrations in Sigmodon hispidus from a Superfund site

    International Nuclear Information System (INIS)

    Bowers, B.; McBee, K.; Lochmiller, R.; Burks, S.; Qualls, C.

    1995-01-01

    Cotton rats (Sigmodon hispidus) were collected from an EPA Superfund site located on an abandoned oil refinery. Three trapping grids were located on the refinery and three similar grids were located at uncontaminated localities which served as reference sites. Bone marrow metaphase chromosome preparations were examined for chromosomal damage. For each individual, 50 cells were scored for six classes of chromosomal lesions. For the fall 1991 trapping period, mean number of aberrant cells per individual was 2.33, 0.85, and 1.50 for the three Superfund grids., Mean number of aberrant cells per individual was 2.55, 2.55, and 2.12 from the reference grids. Mean number of lesions per cell was 2.77, 0.86, and 1.9 from the Superfund grids, and 3.55, 2.77, and 2.50 from the reference grids. For the spring 1992 trapping period, more damage was observed in animals from both Superfund and reference sites; however, animals from Superfund grids had more damage than animals from reference grids. Mean number of aberrant cells per individual was 3.50, 3.25, and 3.70 from the Superfund grids, and 2.40, 2.11, and 1.40 from the reference grids. Mean number of lesions per cell was 4.80, 4.25, and 5.50 from the Superfund grids, and 2.60, 2.33, and 1.50 from the reference grids. These data suggest animals may be more susceptible to chromosomal damage during winter months, and animals from the Superfund grids appear to be more severely affected than animals from reference grids

  10. SITE COMPREHENSIVE LISTING (CERCLIS) - Contaminants at CERCLIS (Superfund) Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Contaminants at Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Sites - The CERCLIS Public Access Database...

  11. Remediation of acid tar sludge at a Superfund site

    International Nuclear Information System (INIS)

    Grajczak, P.; McManus, R.W.

    1995-01-01

    An old refinery site in Texas was safely remediated a year before schedule and for 25% less than original engineering estimates through aggressive project management and the application of an innovative design. The authors planned to solidify the petroleum acid sludge and place it in an on-site, constructed landfill. Careful evaluation of available solidification technologies lead to selection of the DCR process, a patented stabilization process far waste treatment. The technology offered low expansion factor, low reagent to waste ratio, and low cost. The process also proved to be efficient and safe, implemented using a custom-designed, transportable treatment unit. High treatment rates and continuous uninterrupted operation resulted in early completion of the waste treatment task

  12. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels.

  13. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    International Nuclear Information System (INIS)

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels

  14. Toward identifying the next generation of superfund and hazardous waste site contaminants.

    Science.gov (United States)

    Ela, Wendell P; Sedlak, David L; Barlaz, Morton A; Henry, Heather F; Muir, Derek C G; Swackhamer, Deborah L; Weber, Eric J; Arnold, Robert G; Ferguson, P Lee; Field, Jennifer A; Furlong, Edward T; Giesy, John P; Halden, Rolf U; Henry, Tala; Hites, Ronald A; Hornbuckle, Keri C; Howard, Philip H; Luthy, Richard G; Meyer, Anita K; Sáez, A Eduardo; Vom Saal, Frederick S; Vulpe, Chris D; Wiesner, Mark R

    2011-01-01

    This commentary evolved from a workshop sponsored by the National Institute of Environmental Health Sciences titled "Superfund Contaminants: The Next Generation" held in Tucson, Arizona, in August 2009. All the authors were workshop participants. Our aim was to initiate a dynamic, adaptable process for identifying contaminants of emerging concern (CECs) that are likely to be found in future hazardous waste sites, and to identify the gaps in primary research that cause uncertainty in determining future hazardous waste site contaminants. Superfund-relevant CECs can be characterized by specific attributes: They are persistent, bioaccumulative, toxic, occur in large quantities, and have localized accumulation with a likelihood of exposure. Although still under development and incompletely applied, methods to quantify these attributes can assist in winnowing down the list of candidates from the universe of potential CECs. Unfortunately, significant research gaps exist in detection and quantification, environmental fate and transport, health and risk assessment, and site exploration and remediation for CECs. Addressing these gaps is prerequisite to a preventive approach to generating and managing hazardous waste sites. A need exists for a carefully considered and orchestrated expansion of programmatic and research efforts to identify, evaluate, and manage CECs of hazardous waste site relevance, including developing an evolving list of priority CECs, intensifying the identification and monitoring of likely sites of present or future accumulation of CECs, and implementing efforts that focus on a holistic approach to prevention.

  15. Superfund National Priority List (NPL) Site Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — A set of site boundaries for each site in EPA Region 1 (Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont) on EPA's Superfund National...

  16. NPL Site Locations

    Data.gov (United States)

    U.S. Environmental Protection Agency — The National Priorities List (NPL) is a list published by EPA of Superfund sites. A site must be added to this list before remediation can begin under Superfund. The...

  17. NPL Site Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — The National Priorities List (NPL) is a list published by EPA of Superfund sites. A site must be added to this list before remediation can begin under Superfund. The...

  18. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  19. 78 FR 14543 - Ward Transformer Superfund Site; Raleigh, Wake County, NC; Notice of Settlement

    Science.gov (United States)

    2013-03-06

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL 9788-2; CERCLA-04-2013-3754] Ward Transformer Superfund Site... Ward Transformer Superfund Site located in Raleigh, Wake County, North Carolina. Under the terms of the.... Submit your comments by Site name Ward Transformer Superfund Site by one of the following methods: [[Page...

  20. Superfund Sites as Anti-landscapes

    DEFF Research Database (Denmark)

    Nye, David

    2017-01-01

    Americans have used a range of narratives to make sense of their settlement and use of natural resources. This article focuses on narratives of environmental degradation after the United States passed legislation mandating the cleanup of toxic sites and provided a Superfund for that purpose. Thre...

  1. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - Responsible Parties at CERCLIS Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Responsible Parties at CERCLIS Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access...

  2. An evaluation of traditional and emerging remote sensing technologies for the detection of fugitive contamination at selected Superfund hazardous waste sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2011-01-01

    This report represents a remote sensing research effort conducted by the U.S. Geological Survey in cooperation with the U.S. Environmental Protection Agency (EPA) for the EPA Office of Inspector General. The objective of this investigation was to explore the efficacy of remote sensing as a technology for postclosure monitoring of hazardous waste sites as defined under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (Public Law 96-510, 42 U.S.C. §9601 et seq.), also known as \\"Superfund.\\" Five delisted Superfund sites in Maryland and Virginia were imaged with a hyperspectral sensor and visited for collection of soil, water, and spectral samples and inspection of general site conditions. This report evaluates traditional and hyperspectral imagery and field spectroscopic measurement techniques in the characterization and analysis of fugitive (anthropogenic, uncontrolled) contamination at previously remediated hazardous waste disposal sites.

  3. A method for estimating the local area economic damages of Superfund waste sites

    International Nuclear Information System (INIS)

    Walker, D.R.

    1992-01-01

    National Priority List (NPL) sites, or more commonly called Superfund sites, are hazardous waste sites (HWS) deemed by the Environmental Protection Agency (EPA) to impose the greatest risks to human health or welfare or to the environment. HWS are placed and ranked for cleanup on the NPL based on a score derived from the Hazard Ranking System (HRS), which is a scientific assessment of the health and environmental risks posed by HWS. A concern of the HRS is that the rank of sites is not based on benefit-cost analysis. The main objective of this dissertation is to develop a method for estimating the local area economic damages associated with Superfund waste sites. Secondarily, the model is used to derive county-level damage estimates for use in ranking the county level damages from Superfund sites. The conceptual model used to describe the damages associated with Superfund sites is a household-firm location decision model. In this model assumes that households and firms make their location choice based on the local level of wages, rents and amenities. The model was empirically implemented using 1980 census microdata on households and workers in 253 counties across the US. The household sample includes data on the value and structural characteristics of homes. The worker sample includes the annual earnings of workers and a vector worker attributes. The microdata was combined with county level amenity data, including the number of Superfund sites. The hedonic pricing technique was used to estimate the effect of Superfund sites on average annual wages per household and on monthly expenditures on housing. The results show that Superfund sites impose statistically significant damages on households. The annual county damages from Superfund sites for a sample of 151 counties was over 14 billion dollars. The ranking of counties using the damage estimates is correlated with the rank of counties using the HRS

  4. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    Science.gov (United States)

    This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse and redevelopment of BRAC federal properties. When the BRAC program began in the early 1990s, EPA worked with DoD and the states to identify uncontaminated areas and these parcels were immediately made available for reuse. Since then EPA has worked with DoD to clean up the contaminated portions of bases. These are usually parcels that were training ranges, landfills, maintenance facilities and other past waste-disposal areas. Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned.This data layer shows Superfund Sites that are located at BRAC Federal Facilities. Additional Superfund sites and other BRAC sites (those that are not Superfund sites) are included in other data layers as part of this web service.BRAC Superfund Sites shown in this web service are derived from the epa.gov website and include links to the relevant web pages within the attribute table. Data about BRAC Superfund Sites are located on their own EPA web pages, and CIMC links to those pages. The CIMC web service

  5. Case study: Montclair/West Orange and Glen Ridge Radium Superfund sites

    International Nuclear Information System (INIS)

    Pezzella, R.; Seppi, P.; Watson, D.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Radium Sites are located 12 miles west of New York City in three residential communities in Essex County, New Jersey. The sites are contaminated with waste materials from a local radium processing facility which ceased operations in 1926. Houses were subsequently constructed on or near the radium waste disposal areas. The waste material was also used as backfill, which caused contamination to be spread randomly over the communities. There are 769 properties between four townships that comprise the Superfund sites. The Environmental Protection Agency (EPA) conducted an aerial survey in 1981 which identified the boundaries of the sites. In 1985, the New Jersey Department of Environmental Protection (NJDEP) began a pilot study to examine the feasibility of excavation and off-site disposal of contaminated material as a permanent solution. The study was interrupted when the permit for the disposal site was revoked by the state of Nevada. Since 1990 field testing has been completed on over 725 properties and remediation and restoration has been completed on 75 properties

  6. Occurences and Fate of DDT Principal Isomers/Metabolites, DDA, and o,p'-DDD Enantiomers in Fish, Sediment and Water at a DDT-Impacted Superfund Site

    Science.gov (United States)

    In the 1950s and 60s, discharges from a DDT manufacturing plant contaminated a tributary system of the Tennessee River near Huntsville, Alabama, USA. Regulatory action resulted in declaring the area a Superfund site which required remediation and extensive monitoring. Monitoring ...

  7. 78 FR 23563 - LWD, Inc. Superfund Site; Calvert City, Marshall County, Kentucky; Notice of Settlement

    Science.gov (United States)

    2013-04-19

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9805-2; CERCLA-04-2013-3751] LWD, Inc. Superfund Site... costs concerning the LWD, Inc., Superfund Site located in Calvert City, Marshall County, Kentucky. The... V. Painter. Submit your comments by Site name LWD, Inc., Superfund Site by one of the following...

  8. Geochemical Characteristics of TP3 Mine Wastes at the Elizabeth Copper Mine Superfund Site, Orange County, Vermont

    Science.gov (United States)

    Hammarstrom, Jane M.; Piatak, Nadine M.; Seal, Robert R.; Briggs, Paul H.; Meier, Allen L.; Muzik, Timothy L.

    2003-01-01

    Remediation of the Elizabeth mine Superfund site in the Vermont copper belt poses challenges for balancing environmental restoration goals with issues of historic preservation while adopting cost-effective strategies for site cleanup and long-term maintenance. The waste-rock pile known as TP3, at the headwaters of Copperas Brook, is especially noteworthy in this regard because it is the worst source of surface- and ground-water contamination identified to date, while also being the area of greatest historical significance. The U.S. Geological Survey (USGS) conducted a study of the historic mine-waste piles known as TP3 at the Elizabeth mine Superfund site near South Strafford, Orange County, VT. TP3 is a 12.3-acre (49,780 m2) subarea of the Elizabeth mine site. It is a focus area for historic preservation because it encompasses an early 19th century copperas works as well as waste from late 19th- and 20th century copper mining (Kierstead, 2001). Surface runoff and seeps from TP3 form the headwaters of Copperas Brook. The stream flows down a valley onto flotation tailings from 20th century copper mining operations and enters the West Branch of the Ompompanoosuc River approximately 1 kilometer downstream from the mine site. Shallow drinking water wells down gradient from TP3 exceed drinking water standards for copper and cadmium (Hathaway and others, 2001). The Elizabeth mine was listed as a Superfund site in 2001, mainly because of impacts of acid-mine drainage on the Ompompanoosuc River.

  9. Case history: Vertical barrier wall system for Superfund Site

    International Nuclear Information System (INIS)

    Koelling, M.A.; Kovac, C.P.; Norris, J.E.

    1997-01-01

    Design considerations and construction aspects are presented for the installation of a vertical barrier wall system for the Boeing Company at a Superfund Site near Seattle, WA. The construction was performed during 1996. The vertical barrier wall system included: (1) a soil-bentonite (SB) slurry wall, approximately 670 meters (2200 feet) in length, ranging from 12 to 21 meters (40 to 70 feet) in depth; (2) expansion of a cover system over the area enclosed by the SB wall; and (3) surface drainage improvements. Design and construction of the system addressed requirements of a Consent Decree for the site issued in 1993. The paper discusses the development of the design to meet remedial performance goals of preventing migration of contaminants in the soil/groundwater system and aiding aquifer restoration. Secondly, the paper details installation of the SB wall, highlighting the more significant construction issues, which included excavation of the wall through glacially deposited cobbles/boulders/till as well as addressing the severe elevation changes along the wall alignment. Thirdly, the paper presents Quality Assurance (QA) monitoring and testing performed during the construction phase

  10. Superfund Record of Decision (EPA Region 5): Ossineke Groundwater Contamination Site, Alpena County, Ossineke, MI. (First remedial action), June 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The Ossineke Ground Water Contamination site is an area overlying a contaminated aquifer in Ossineke, Alpena County, Michigan. The site hydrogeology is characterized by an upper aquifer and lower confined aquifer, both of which supply drinking water to local residents. Historically there have been two contaminant source areas of concern within Ossineke. Area 1 is in the center of the Town of Ossineke where two gas stations are located, consisting of underground storage tanks, and a former automobile rustproofing shop. Area 2 is a laundry and dry cleaning facility that has an associated wash water pond containing chlorinated hydrocarbons and VOCs. The State advised all users of the upper aquifer to stop using their wells. In 1982, the State discovered that a snow plow had hit a gasoline pump causing an unknown amount of gasoline to spill and, subsequently, contaminate the basements of several businesses. In 1986, the State replaced residential wells affected by ground water contamination. Because the contaminants of concern have been confirmed to be related to petroleum releases from underground storage tanks, the Superfund program does not have the authority to address cleanup under CERLCLA. The selected remedial action for the site is that no further action

  11. Environmental compliance at U.S. Department of Energy FUSRAP (Formerly Utilized Sites Remedial Action Program) sites

    International Nuclear Information System (INIS)

    Liedle, S.D.; Clemens, B.W.

    1988-01-01

    With the promulgation of the Superfund Amendments and Reauthorization Act (SARA), federal facilities were required to comply with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) in the same manner as any non-government entity. This presented challenges for the Department of Energy (DOE) and other federal agencies involved in remedial action work because there are many requirements under SARA that overlap other laws requiring DOE compliance, e.g., the National Environmental Policy Act (NEPA). This paper outlines the options developed to comply with CERCLA and NEPA as part of active, multi-site remedial action program. The program, the Formerly Utilized Sites Remedial Action Program (FUSRAP), was developed to identify, clean up, or control sites containing residual radioactive or chemical contamination as a result of the nation's early development of nuclear power. During the Manhattan Project, uranium was extracted from ores and resulted in mill concentrates, purified metals, and waste products that were transported for use or disposal at other locations. Figure 1 shows the steps for producing uranium metal during the Manhattan Project. As a result of these activities materials, equipment, buildings, and land became contaminated, primarily with naturally occurring radionuclides. Currently, FUSRAP includes 29 sites; three are on the Environmental Protection Agency's (EPA's) National Priorities List (NPL) of hazardous waste sites

  12. Thermal treatment and competing technologies for remediation of MGP (manufactured gas plant) sites

    International Nuclear Information System (INIS)

    McGowan, T.F.; Greer, B.A.; Lawless, M.

    1995-01-01

    More than 1,500 MGP (manufactured gas plant) sites exist throughout the US. Many are contaminated with coal tar from coal-fueled gas works which produced ''town gas'' from the mid-1800s through the 1950s. Virtually all old US cities have such sites. Most are in downtown areas, as they were installed for central distribution of manufactured gas. While a few sites are CERCLA/Superfund, most are not. However, the contaminants and methods used for remediation are similar to those used for Superfund cleanups of coal tar contamination from wood-treating and coke oven facilities. Clean-up of sites is triggered by property transfers and re-development as well as releases to the environment--in particular, via ground water migration. This paper describes recent experience with high capacity/low cost thermal desorption process for this waste. It also reviews competing non-thermal technology, such as bio-treatment, capping, recycling, and dig and haul. Cost data are provided for all technologies, and a case study for thermal treatment is also presented

  13. Selected remedy at the Queen City Farms superfund site: A risk management approach

    International Nuclear Information System (INIS)

    Weber, E.F.; Wilson, J.; Kirk, M.; Tochko, S.

    1994-01-01

    A risk management approach at a former industrial waste disposal site in western Washington resulted in a selected remedy that is cost-effective and that meets the CERCLA threshold criterion of protecting human health and the environment. The proposed remedy, which addresses contamination in soil and groundwater, does not require an ARARs waiver and received state and community acceptance. By analyzing the current and potential risk at the site, a proposed remedy was chosen that would control the source and naturally attenuate the groundwater plume. Source control will include removal and treatment of some light nonaqueous phase liquid (LNAPL) and some soil, followed by isolation of the remaining soil and LNAPL within a slurry wall and beneath a multilayer cap. A contingent groundwater extraction and treatment system was included to address uncertainty in the risk characterization. Implementing source control is predicted to result in a steady decline in volatile organic compound levels in the drinking water aquifer through adsorption, degradation, and dispersion. Exposure to groundwater during the period of natural attenuation will be controlled by monitoring, institutional controls, and a thorough characterization of the plume and receptors. 7 figs., 1 tab

  14. 75 FR 49414 - Cooperative Agreements and Superfund State Contracts for Superfund Response Actions

    Science.gov (United States)

    2010-08-13

    ...-0276. FOR FURTHER INFORMATION CONTACT: Angelo Carasea, Assessment and Remediation Division, Office of Superfund Remediation and Technology Innovation, (5204P), Environmental Protection Agency, 1200 Pennsylvania... funds to a State, political subdivision, or Indian Tribe that assumes responsibility as the lead or...

  15. Region 9 NPL Sites (Superfund Sites 2013)

    Science.gov (United States)

    NPL site POINT locations for the US EPA Region 9. NPL (National Priorities List) sites are hazardous waste sites that are eligible for extensive long-term cleanup under the Superfund program. Eligibility is determined by a scoring method called Hazard Ranking System. Sites with high scores are listed on the NPL. The majority of the locations are derived from polygon centroids of digitized site boundaries. The remaining locations were generated from address geocoding and digitizing. Area covered by this data set include Arizona, California, Nevada, Hawaii, Guam, American Samoa, Northern Marianas and Trust Territories. Attributes include NPL status codes, NPL industry type codes and environmental indicators. Related table, NPL_Contaminants contains information about contaminated media types and chemicals. This is a one-to-many relate and can be related to the feature class using the relationship classes under the Feature Data Set ENVIRO_CONTAMINANT.

  16. Optimization Review: Carson River Mercury Superfund Site, Carson City, Nevada

    Science.gov (United States)

    The Carson River Mercury Site (CRMS) (Figure 1) is located in northwest Nevada and was designated a Superfund site in 1990 because of elevated mercury concentrations observed in surface water, sediments and biota inhabiting the site.

  17. Role of institutional controls in selection of remedial measures

    International Nuclear Information System (INIS)

    Bakr, A.A.; Agoston, E.N.; McLeod, R.V.; Hicks, H.T.

    1992-01-01

    This paper explores the regulatory intent of CERCLA's definition and applicability of institutional controls at hazardous substance release sites undergoing remedial action and institutional controls that have been defined and implemented at selected CERCLA (Superfund) sites in the United States. Under provisions of CERCLA, institutional controls can be components of, or supplements to, interim or final remedial measures for hazardous substance [as defined under CERCLA 101(14)] releases. The use of institutional controls has been proposed in a number of RODs for large Superfund sites (e.g., Times Beach, Missouri; the Clothier Disposal Site in Oswego County, New York; and the Wildcat Landfill in Kent County, Delaware). In these cases, the selected remedial actions combine active response measures with institutional controls to protect human health and the environment. These RODs provide insight to how widely the concept of institutional controls is used and under what conditions. The use of institutional controls at large federal facilities is also discussed

  18. SHIRCO PILOT-SCALE INFRARED INCINERATION SYSTEM AT THE ROSE TOWNSHIP DEMODE ROAD SUPERFUND SITE

    Science.gov (United States)

    Under the Superfund Innovative Technology Evaluation or SITE Program, an evaluation was made of the Shirco Pilot-Scale Infrared Incineration System during 17 separate test runs under varying operating conditions. The tests were conducted at the Demode Road Superfund site in Ros...

  19. 78 FR 729 - Ellman Battery Superfund Site; Orlando, Orange County, FL; Notice of Settlement

    Science.gov (United States)

    2013-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9767-6; CERCLA-04-2012-3780] Ellman Battery Superfund Site; Orlando, Orange County, FL; Notice of Settlement AGENCY: Environmental Protection Agency (EPA). ACTION... Action at the Ellman Battery Superfund Site located in Orlando, Orange County, Florida. DATES: The Agency...

  20. 77 FR 16548 - Florida Petroleum Reprocessors Superfund Site; Davie, Broward County, FL; Notice of Settlements

    Science.gov (United States)

    2012-03-21

    ...-2012- 3766; CERCLA-04-2012-3765] Florida Petroleum Reprocessors Superfund Site; Davie, Broward County... costs concerning the Florida Petroleum Reprocessors Superfund Site located in Davie, Broward County.... Painter. Submit your comments by Site name Florida Petroleum Reprocessors by one of the following methods...

  1. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    Science.gov (United States)

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  2. Superfund Record of Decision (EPA Rregion 4): Oak Ridge Reservation (USDOE), (Operable Unit 3), Anderson County, Oak Ridge, TN. (Second remedial action), September 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Oak Ridge Reservation (ORR) (USDOE) (Operable Unit 3) site is an active nuclear weapons component manufacturing facility located in Oak Ridge, Anderson County, Tennessee. The Y-12 plant, which is addressed as Operable Unit 3, is one of several hundred waste disposal sites or areas of contamination at the ORR site requiring Superfund remedial action. The site occupies the upper reaches of East Fork Poplar Creek (EFPC) in Bear Creek Valley. From 1940 to the present, the Y-12 plant has been used to produce nuclear weapons components. From 1955 to 1963, mercury was used in a column-exchange process to separate lithium isotopes. Testing of the three concrete tanks showed that the tank sediment contained mercury, and that contaminated waste is still being discharged into two of the three tanks. The Record of Decision (ROD) focuses on the contaminated sediment in the sedimentation tanks as an interim action. The primary contaminants of concern affecting the sediment are mercury, a metal and radioactive materials. The selected interim remedial action for the site is included

  3. Cleanups In My Community (CIMC) - Superfund National Priority List (NPL) Sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Superfund National Priority List Sites as part of the CIMC web service. Superfund is a program administered by the EPA to locate,...

  4. 77 FR 11533 - Anniston PCB Superfund Site, Anniston, Calhoun County, Alabama; Notice of Amended Settlement

    Science.gov (United States)

    2012-02-27

    ... ENVIRONMENTAL PROTECTION AGENCY [CERCLA-04-2012-3763; FRL 9637-7] Anniston PCB Superfund Site... past response costs concerning the Anniston PCB Superfund Site located in Anniston, Calhoun County.... Submit your comments by Site name Anniston PCB by one of the following methods: www.epa.gov/region4...

  5. Measurement and monitoring technologies are important SITE program component

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    An ongoing component of the Superfund Innovative Technologies Evaluation (SITE) Program, managed by the US EPA at its Hazardous Waste Engineering Research Laboratory in Cincinnati, is the development and demonstration of new and innovative measurement and monitoring technologies that will be applicable to Superfund site characterization. There are four important roles for monitoring and measurement technologies at Superfund sites: (1) to assess the extent of contamination at a site, (2) to supply data and information to determine impacts to human health and the environment, (3) to supply data to select the appropriate remedial action, and (4) to monitor the success or effectiveness of the selected remedy. The Environmental Monitoring Systems Laboratory in Las Vegas, Nevada (EMSL-LV) has been supporting the development of improved measurement and monitoring techniques in conjunction with the SITE Program with a focus on two areas: Immunoassay for toxic substances and fiber optic sensing for in-situ analysis at Superfund sites

  6. Centredale Manor Superfund Site in Rhode Island included on EPA List of Targeted for Immediate Attention

    Science.gov (United States)

    Today, the U.S. Environmental Protection Agency released the list of Superfund sites that Administrator Pruitt has targeted for immediate and intense attention. The Centredale Manor Restoration Project superfund site is one of the 21 sites on the list.

  7. EPA [Environmental Protection Agency] SITE [Superfund Innovative Technology Evaluation] program seeks technology proposals

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    EPA will issue an RFP to initiate the SITE-005 solicitation for demonstration of technologies under the Superfund Innovative Technology Evaluation (SITE) Program. This portion of the SITE program offers a mechanism for conducting a joint technology demonstration between EPA and the private sector. The goal of the demonstration program is to provide an opportunity for developers to demonstrate the performance of their technologies on actual hazardous wastes at Superfund sites, and to provide accurate and reliable data on that performance. Technologies selected must be of commercial scale and provide solutions to problems encountered at Superfund Sites. Primary emphasis in the RFP is on technologies that address: treatment of mixed, low level radioactive wastes in soils and groundwater; treatment of soils and sludges contaminated with organics and/or inorganics, materials handling as a preliminary step to treatment or further processing, treatment trains designed to handle specific wastes, are in situ technologies, especially those processes providing alternatives to conventional groundwater pump and treat techniques

  8. Risk management at hazardous waste sites

    International Nuclear Information System (INIS)

    Travis, C.C.; Doty, C.B.

    1990-01-01

    The Superfund Amendments and Reauthorization Act of 1986 (SARA) provided the Environmental Protection Agency (EPA) with additional resources and direction for the identification, evaluation, and remediation of hazardous waste sites in the United States. SARA established more stringent requirements for the Superfund program, both in terms of the pace of the program and the types of remedial alternatives selected. The central requirement is that remedial alternatives be ''protective of public health and the environment'' and ''significantly and permanently'' reduce the toxicity, mobility, or volume of contaminants. The mandate also requires that potential risk be considered in the decision-making process. This document discusses risk management at hazardous waste sites. Topics include selection of sites for placement on the National Priority List, risk assessment and the decision process, risk reduction and remedial alternative selection, and aquifer restoration. 10 refs., 2 figs

  9. Superfund impasse

    International Nuclear Information System (INIS)

    Dowd, R.M.

    1988-01-01

    EPA recently reported to Congress on the status of the Superfund program. A review of the report reveals that Superfund is a costly, slow-moving juggernaut that consumes an ever-growing share of resources and threatens to overwhelm other, more pressing environmental issues. EPA was given a broad mandate to clean up hazardous-waste sites when Congress enacted the Comprehensive Environmental Response. Compensation, and Liability Act in 1980 and established a $1.6 billion appropriation for a Superfund. In 1986 Congress extended the program for another five years and added $8.5 billion to complete the job-an overly optimistic estimate, as we shall see. Superfund is a huge program; the inventory of potentially hazardous waste sites is large and growing quickly. By the end of fiscal year 1987, EPA's inventory listed 27,571 hazardous-waste sites,and this number is increasing steadily at a rate of about 2500 each year. The General Accounting Office suggests that there may be as many as 150,000 such sites

  10. An evaluation of remote sensing technologies for the detection of fugitive contamination at selected Superfund hazardous waste sites in Pennsylvania

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2014-01-01

    This evaluation was conducted to assess the potential for using both traditional remote sensing, such as aerial imagery, and emerging remote sensing technology, such as hyperspectral imaging, as tools for postclosure monitoring of selected hazardous waste sites. Sixteen deleted Superfund (SF) National Priorities List (NPL) sites in Pennsylvania were imaged with a Civil Air Patrol (CAP) Airborne Real-Time Cueing Hyperspectral Enhanced Reconnaissance (ARCHER) sensor between 2009 and 2012. Deleted sites are those sites that have been remediated and removed from the NPL. The imagery was processed to radiance and atmospherically corrected to relative reflectance with standard software routines using the Environment for Visualizing Imagery (ENVI, ITT–VIS, Boulder, Colorado) software. Standard routines for anomaly detection, endmember collection, vegetation stress, and spectral analysis were applied.

  11. Remedial design of the Fultz Landfill Site, Byesville, Ohio

    International Nuclear Information System (INIS)

    Rajaram, V.; Riesing, R.; Bloom, T.

    1994-01-01

    The Fultz Landfill Superfund (Fultz) site is a 30-acre hazardous waste landfill located near Byesville, Ohio. The site is approximately 75 miles east of Columbus and 3 miles southwest of Cambridge, the largest city in Guernsey County, Ohio. The landfill is situated on the north slope of a ridge that overlies abandoned coal mines in the Upper Freeport Coal seam. The north half of the landfill lies in an unreclaimed strip mine in the Upper Freeport Coal seam, where saturated portions of surface mine spoils and natural soils form the ''shallow aquifer''. The south half of the landfill lies 40 to 50 feet (ft.) above an abandoned, flooded deep mine in the same coal seam. The flooded deep mine forms an aquifer referred to as the ''coal mine aquifer''. This paper presents the results of design studies completed by PRC Environmental Management, Inc. (PRC), during 1993, and the remedial design (RD) of the components specified by the US Environmental Protection Agency (EPA) Record of Decision (ROD) for the Fultz site (EPA 1991). The remedy specified in the ROD includes a multilayer landfill cap that is compliant with Resource Conservation and Recovery Act (RCRA) Subtitle C guidelines, a leachate collection and groundwater extraction and treatment system, and stabilizing mine voids underlying the southern portion of the site. Vinyl chloride is the only contaminant exceeding a maximum contaminant limit (MCL) in the coal mine aquifer

  12. Remedial design process for Montclair/West Orange and Glen Ridge radium sites

    International Nuclear Information System (INIS)

    MacIndoe, M.; Johnson, R.; Paez-Restrepo, A.; Wilkinson, S.; Hyman, M.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, New Jersey, are contaminated to varying degrees with radioactive materials. The waste materials originated from radium processing facilities prevalent in the area during the early 1900's. The two sites consist of 769 residential and commercial properties having a combined land area of approximately 210 acres. Historically, radioactive waste materials were disposed as landfill material in what were once rural areas. As development flourished, homes and streets were constructed over the landfilled waste. In 1981 the EPA conducted an aerial gamma radiation survey of the area to determine the presence of radioactive materials. It was from this survey that subsequent ground studies where initiated, and elevated gamma radiation and radon levels were discovered. The paper will discuss the methods used to obtain data through field investigations; the relationship between the interpretation of data to define the vertical and lateral limits of contamination and the selection of remedial design methods used to develop excavation plans; the evolution of remediation methods and technologies relative to the remediation of structures by underpinning basements, on-grade structures, and chimneys; removal of contaminated material beneath footings without cribbing; and demolition of basement foundation walls (where contaminated) without use of traditional support methods. Finally, the paper will discuss remedial action execution of the work

  13. Characterization and remediation of soil prior to construction of an on-site disposal facility at Fernald

    International Nuclear Information System (INIS)

    Hunt, A.; Jones, G.; Nelson, K.

    1998-03-01

    During the production years at the Feed Materials Production Center (FMPC), the soil of the site and the surrounding areas was surficially impacted by airborne contamination. The volume of impacted soil is estimated at 2.2 million cubic yards. During site remediation, this contamination will be excavated, characterized, and disposed of. In 1986 the US Environmental Protection Agency (EPA) and the Department of Energy (DOE) entered into a Federal Facility Compliance Agreement (FFCA) covering environmental impacts associated with the FMPC. A site wide Remedial Investigation/Feasibility Study (RI/FS) was initiated pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act (CERCLA). The DOE has completed the RI/FS process and has received approval of the final Records of Decision. The name of the facility was changed to the Fernald Environmental Management Project (FEMP) to emphasize the change in mission to environmental restoration. Remedial actions which address similar scopes of work or types of contaminated media have been grouped into remedial projects for the purpose of managing the remediation of the FEMP. The Soil Characterization and Excavation Project (SCEP) will address the remediation of FEMP soils, certain waste units, at- and below-grade material, and will certify attainment of the final remedial limits (FRLs) for the FEMP. The FEMP will be using an on-site facility for low level radioactive waste disposal. The facility will be an above-ground engineered structure constructed of geological material. The area designated for construction of the base of the on-site disposal facility (OSDF) is referred to as the footprint. Contaminated soil within the footprint must be identified and remediated. Excavation of Phase 1, the first of seven remediation areas, is complete

  14. Program management strategies for following EPA guidance for remedial design/remedial action at DOE sites

    International Nuclear Information System (INIS)

    Hopper, J.P.; Chew, J.R.; Kowalski, T.E.

    1991-01-01

    At the US Department of Energy (DOE) facilities, environmental restoration is being conducted in accordance with Federal Facilities Compliance Agreements (or Interagency Agreements). These agreements establish a cooperative working relationship and often define roles, responsibilities and authorities for conduct and oversight of the Remedial Action Programs. The US Environmental Protection Agency (EPA) has guidelines on how to initiate and perform remedial actions for sites they are remediating under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) as amended by the Superfund Amendments and Re-Authorization Act (SARA). This paper addresses some of the difference and commonalities between the DOE project management procedures and EPA guidance documents. This report covers only the RD/RA phase of environmental restoration. On the surface, there are many apparent differences between the DOE and EPA project management processes. Upon closer review, however, many of the differences are the result of applying different terminology to the same phase of a project. By looking for the similarities in the two processes rather than hunting for differences, many communication problems are avoided. Understanding both processes also aids in figuring out when, how and to what extent EPA should participate in the RD/RA phase for DOE lead cleanup activities. The DOE Remedial Design and Remedial Action process is discussed in a stepwise manner and compared to the EPA process. Each element of the process is defined. Activities common to both the EPA and DOE are correlated. The annual DOE budget cycle for remediation projects and the four-year cycle for appropriation of remediation funds are discussed, and the constraints of this process examined. DOE orders as well as other requirements for RD/RA activities are summarized and correlated to EPA regulations where this is possible

  15. 40 CFR 35.4040 - How many groups can receive a TAG at one Superfund site?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false How many groups can receive a TAG at one Superfund site? 35.4040 Section 35.4040 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Eligible? § 35.4040 How many groups can receive a TAG at one Superfund site? (a) Only one TAG may be...

  16. Site enforcement tracking system (SETS): PRP listing by site for region 9

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  17. Site enforcement tracking system (SETS): PRP listing by site for region 8

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  18. Site enforcement tracking system (SETS): PRP listing by site for region 10

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  19. Site enforcement tracking system (SETS): PRP listing by site for region 3

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  20. Site enforcement tracking system (SETS): PRP listing by site for region 2

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  1. Site enforcement tracking system (SETS): PRP listing by site for region 5

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  2. Site enforcement tracking system (SETS): PRP listing by site for region 6

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  3. Superfund Removal Site Points, Region 9, 2012, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of CERCLA (Superfund) Removal sites. CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act)...

  4. Briefing paper -- Remedial Action Assessment System

    International Nuclear Information System (INIS)

    Buelt, J.L.

    1990-04-01

    Congress has mandated a more comprehensive management of hazardous wastes with the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or ''Superfund'') and the Superfund Amendment and Reauthorization Act (SARA). This mandate includes restoration of disposal sites contaminated through past disposal practices. This mandate applies to facilities operated for and by the Department of Energy (DOE), just as it does to industrial and other institutions. To help implement the CERCLA/SARA remedial investigation and feasibility study (RI/FS) process in a consistent, timely, and cost-effective manner, a methodology needs to be developed that will allow definition, sorting, and screening of remediation technologies for each operable unit (waste site). This need is stated specifically in Section 2.2.2.1 of the October 1989 Applied Research, Development, Demonstration, Testing, and Evaluation (RDDT ampersand E) Plan of the DOE. This Briefing Paper is prepared to respond to this need. 1 fig

  5. Thermal treatment and non-thermal technologies for remediation of manufactured gas plant sites

    International Nuclear Information System (INIS)

    McGowan, T.F.; Greer, B.A.; Lawless, M.

    1996-01-01

    More than 1,500 manufactured gas plant (MGP) sites exist throughout the US. Many are contaminated with coal tar from coal-fueled gas works which produced town gas from the mid-1800s through the 1950s. Virtually all old US cities have such sites. Most are in downtown areas as they were installed for central distribution of manufactured gas. While a few sites are CERCLA/Superfund, most are not. However, the contaminants and methods used for remediation are similar to those used for Superfund clean-ups of coal tar contamination from wood-treating and coke oven facilities. Clean-up of sites is triggered by regulatory pressure, property transfers and re-development as well as releases to the environment--in particular, via groundwater migration. Due to utility de-regulation, site clean-ups may also be triggered by sale of a utility or of a specific utility site to other utilities. Utilities have used two approaches in dealing with their MGP sites. The first is do nothing and hope for the best. History suggests that, sooner or later, these sites become a bigger problem via a release, citizen lawsuit or regulatory/public service commission intervention. The second, far better approach is to define the problem now and make plans /for waste treatment or immobilization. This paper describes recent experience with a high capacity/low cost thermal desorption process for this waste and reviews non-thermal technology, such as bio-treatment, capping, recycling, and dig and haul. Cost data are provided for all technologies, and a case study for thermal treatment is also presented

  6. Optimization Evaluation: Lee Chemical Superfund Site, City Of Liberty, Clay County, Missouri

    Science.gov (United States)

    The Lee Chemical Superfund Site (site) is located along Missouri Highway 210 in Liberty, Missouri, approximately 15 miles east of Kansas City, Missouri. Currently, the site is a vacant lot of approximately2.5 acres in a flat alluvial plain.

  7. FUSRAP adapts to the amendments of Superfund

    International Nuclear Information System (INIS)

    Atkin, R.G.; Liedle, S.D.; Clemens, B.W.

    1988-01-01

    With the promulgation of the Superfund Amendments and Reauthorization Act (SARA) federal facilities were required to comply with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) in the same manner as any non-government entity. This situation presented challenges for the Department of Energy (DOE) and other federal agencies involved in remedial action work because of the requirements under SARA that overlap other laws requiring DOE compliance, e.g., the National Environmental Policy Act (NEPA). This paper outlines options developed to comply with CERCLA and NEPA as part of an active, multi-site remedial action program. The program, the Formerly Utilized Sites Remedial Action Program (FUSRAP), was developed to identify, clean up, or control sites containing residual radioactive contamination resulting from the nation's early development of nuclear power. During the Manhattan Project, uranium was extracted from domestic and foreign ores and resulted in mill concentrates, purified metals, and waste products that were transported for use or disposal at other locations. Figure 1 shows the steps for producing uranium metal during the Manhattan Project. As a result of these activities materials equipment, buildings, and land became contaminated, primarily with naturally occurring radionuclides. Currently, FUSRAP includes 29 sites; three are on the Environmental Protection Agency's (EPA's) National Priorities List (NPL) of hazardous waste sites

  8. 78 FR 47317 - Ore Knob Mine Superfund Site; Laurel Springs, Ashe County, North Carolina; Notice of Settlement

    Science.gov (United States)

    2013-08-05

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9843-3; CERCLA-04-2013-3759] Ore Knob Mine Superfund Site; Laurel Springs, Ashe County, North Carolina; Notice of Settlement AGENCY: Environmental Protection Agency... settlement with Herbert N. Francis concerning the Ore Knob Mine Superfund Site located in Laurel Springs...

  9. Superfund at work: Hazardous waste cleanup efforts nationwide, spring 1993 (Radium Chemical Site profile, Queens, New York)

    International Nuclear Information System (INIS)

    1993-01-01

    The Radium Chemical hazardous waste site in Queens, New York was contaminated with radium, posing a grave potential threat to the community. The US Environmental Protection Agency (EPA) used the Superfund program to design a long-term cleanup for the site using input from citizens and the business community. Superfund staff: Mobilized a quick cleanup action to remove 10,000 small containers of radium; Developed a streamlined approach to long-term cleanup; Secured the site to reduce the possibility of radiation exposure to the local residents; Cooperated with the community to design a well-organized emergency response plan; and Educated local citizens about site hazards, incorporating community concerns into the cleanup process. The Radium Chemical site is a clear example of EPA's effective management and problem-solving strategies at Superfund sites

  10. Superfund Technology Evaluation Report: SITE Program Demonstration Test Shirco Pilot-Scale Infrared Incineration System at the Rose Township Demode Road Superfund Site Volume I

    Science.gov (United States)

    The Shirco Pilot-Scale Infrared Incineration System was evaluated during a series of seventeen test runs under varied operating conditions at the Demode Road Superfund Site located in Rose Township, Michigan. The tests sought to demonstrate the effectiveness of the unit and the t...

  11. Superfund record of decision (EPA Region 2): Carroll and Dubies Sewage Disposal, Port Jervis, Town of Deerpark, Orange County, NY, September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This decision document presents the selected remedial action for the contaminated groundwater at the Carroll and Dubies Superfund Site (the Site). This operable unit represents the second of two operable units planned for the Site. It addresses the contaminated groundwater underlying and downgradient of the Carroll and Dubies site.

  12. Can standard sequential extraction determinations effectively define heavy metal species in superfund site soils?

    Energy Technology Data Exchange (ETDEWEB)

    Dahlin, Cheryl L.; Williamson, Connie A.; Collins, Wesley K.; Dahlin, David C.

    2001-01-01

    Speciation and distribution of heavy metals in soils controls the degree to which metals and their compounds are mobile, extractable, and plant-available. Consequently, speciation impacts the success of remediation efforts both by defining the relationship of the contaminants with their environment and by guiding development and evaluation of workable remediation strategies. The U.S. Department of Energy, Albany Research Center (Albany, OR), under a two-year interagency project with the U.S. Environmental Protection Agency (EPA), examined the suitability of sequential extraction as a definitive means to determine species of heavy metals in soil samples. Representative soil samples, contaminated with lead, arsenic, and/or chromium, were collected by EPA personnel from two Superfund sites, the National Lead Company site in Pedricktown, NJ, and the Roebling Steel, Inc., site in Florence, NJ. Data derived from Tessier=s standard three-stage sequential-extraction procedure were compared to data from a comprehensive characterization study that combined optical- and scanning-electron microscopy (with energy-dispersive x-ray and wavelength-dispersive x-ray analyses), x-ray diffraction, and chemical analyses. The results show that standard sequential-extraction procedures that were developed for characterizing species of contaminants in river sediments may be unsuitable for sole evaluation of contaminant species in industrial-site materials (particularly those that contain larger particles of the contaminants, encapsulated contaminants, and/or man-made materials such as slags, metals, and plastics). However, each sequential extraction or comprehensive characterization procedure has it=s own strengths and weaknesses. Findings of this study indicate that the use of both approaches, during the early stages of site studies, would be a best practice. The investigation also highlights the fact that an effective speciation study does not simply identify metal contaminants as

  13. 77 FR 13603 - Anniston PCB Superfund Site; Anniston, Calhoun County, AL; Correction

    Science.gov (United States)

    2012-03-07

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9644-2; CERCLA-04-2012-3763] Anniston PCB Superfund Site... FR 11533 (FRL-9637-7), EPA posted a Notice of Amended Settlement concerning the Anniston PCB... the settlement are available from Ms. Paula V. Painter. Submit your comments by Site name Anniston PCB...

  14. Blasting at a Superfund chemical waste site

    International Nuclear Information System (INIS)

    Burns, D.R.

    1991-01-01

    During the summer of 1989, Maine Drilling and Blasting of Gardiner, Maine was contracted by Cayer Corporation of Harvard, Massachusetts to drill and blast an interceptor trench at the Nyanza Chemical Superfund Site in Ashland, Massachusetts. The interceptor trench was to be 1,365 feet long and to be blasted out of granite. The trench was to be 12 feet wide at the bottom with 1/1 slopes, the deepest cut being 30 feet deep. A French drain 12 feet wide by 15 to 35 feet deep was blasted below the main trench on a 2% slope from its center to each end. A French drain is an excavation where the rock is blasted but not dug. The trench would be used as a perimeter road with any ground water flow going through the French drain flowing to both ends of the trench. Being a Superfund project turned a simple blasting project into a regulatory nightmare. The US Environmental Protection Agency performed all the chemical related functions on site. The US Army Corps of Engineers was overseeing all related excavation and construction on site, as was the Massachusetts Department of Environmental Quality Engineering, the local Hazardous Wastes Council, and the local Fire Department. All parties had some input with the blasting and all issues had to be addressed. The paper outlines the project, how it was designed and completed. Also included is an outline of the blast plan to be submitted for approval, an outline of the Safety/Hazardous Waste training and a description of all the problems which arose during the project by various regulatory agencies

  15. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a selected set of...

  16. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  17. Innovative design and construction solutions to remediate radiologically contaminated residential communities in Essex County New Jersey

    International Nuclear Information System (INIS)

    MacIndoe, M.S.; Johnson, R.T.; Wilkinson, S.G.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essen Country, New Jersey, are contaminated to varying degrees with radioactive materials. Both sites are listed on the Superfund National Priorities List (NPL). The waste materials originated from radium processing facilities prevalent in the area during the early 1900's. The design for remediation of these sites is performed by Bechtel National, Inc. on the behalf of the US Army Corps of Engineers (USACE) Kansas City District, which administers the project through an Interagency Agreement with the US Environmental Protection Agency (EPA) Region 2

  18. Renton's Quendall Terminals on List of EPA Superfund Sites Targeted for Immediate, Intense Attention

    Science.gov (United States)

    EPA released the list of Superfund sites that Administrator Pruitt has targeted for intense and immediate attention, including the Quendall Terminals Site, a former creosote facility on the shore of Lake Washington in Renton, Washington.

  19. STEAM INJECTION REMEDIATION IN FRACTURED BEDROCK AT LORING AIR FORCE BASE

    Science.gov (United States)

    Contaminated groundwater occurs at many Superfund, RCRA, and Brownfields sites. Chlorinated solvents which can form a dense nonaqueous phase (DNAPL) when released to the subsurface can pose an extreme challenge for remediation, as DNAPLs are often difficult to locate and even ha...

  20. Ensuring the adequacy of cost share provisions in superfund state contracts. Directive

    International Nuclear Information System (INIS)

    1993-01-01

    The memorandum requests regional offices to re-examine existing Superfund State Contracts (SSCs) for Fund-financed remedial actions to verify that they adequately reflect incurred and projected remedial action costs

  1. Stigma: The Psychology and Economics of Superfund (2004)

    Science.gov (United States)

    Study documents the long-term impacts of Superfund cleanup on property values in communities neighboring prominent Superfund sites, examining the sale prices of nearly 35,000 homes for up to a thirty-year period near six very large Superfund sites.

  2. Electrochemical peroxidation of PCBs and VOCs in superfund site water and sediments

    Energy Technology Data Exchange (ETDEWEB)

    Scrudato, R.J.; Chiarenzelli, J.R. [SUNY, Oswego, NY (United States)

    1996-12-31

    An electrochemical peroxidation (ECP) process has been developed and used to degrade polychlorinated biphenyls (PCB) and volatile organic compounds (VOC)-contaminated water, sludge, and sediments at a New York State Federal and State Superfund Site. The process involves passing an oscillating low-amperage (<10 amps) current through steel electrodes immersed in an acidified water or sediment slurry into which hydrogen peroxide (<1,000 ppm) is added. The generated free radicals attack organic compounds, including organo-metallic complexes and refractory compounds including PCBs. PCB degradation ranged from about 30% to 80% in experiments involving Federal Superfund Site sediments; total PCBs were reduced by {approximately}97% to 68%, respectively, in water and slurry collected from a State Superfund subsurface storage tank. VOC bench-scale experiments involved chloroethane, 1,1-dichloroethane, dichloromethane, 1,1,1-trichloroethane, and acetone and after a 3-min ECP treatment, degradation ranged from >94% to about 99.9%. Results indicate the ECP is a viable process to degrade organic contaminants in water and sediment suspensions. Because the treated water suspensions are acidified, select trace metal sorbed to the particulates is solubilized and therefore can be segregated from the particulates, offering a process that simultaneously degrades organic contaminants and separates trace metals. 19 refs., 1 fig., 4 tabs.

  3. MGP site remediation: Working toward presumptive remedies

    International Nuclear Information System (INIS)

    Larsen, B.R.

    1996-01-01

    Manufactured Gas Plants (MGPs) were prevalent in the United States during the 19th and first half of the 20th centuries. MGPs produced large quantities of waste by-products, which varied depending on the process used to manufacture the gas, but most commonly were tars and polynuclear aromatic hydrocarbons. There are an estimated 3,000 to 5,000 abandoned MGP sites across the United States. Because these sites are not concentrated in one geographic location and at least three different manufacturing processes were used, the waste characteristics are very heterogeneous. The question of site remediation becomes how to implement a cost-effective remediation with the variety of cleanup technologies available for these sites. Because of the significant expenditure required for characterization and cleanup of MGP sites, owners and regulatory agencies are beginning to look at standardizing cleanup technologies for these sites. This paper discusses applicable cleanup technologies and the attitude of state regulatory agencies towards the use of presumptive remedies, which can reduce the amount of characterization and detailed analysis necessary for any particular site. Additionally, this paper outlines the process of screening and evaluating candidate technologies, and the progress being made to match the technology to the site

  4. Superfund record of decision (EPA Region 2): Carroll and Dubies Sewage Disposal, Port Jervis, NY, March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This decision document presents the selected remedial action for the Carroll and Dubies Superfund Site (the Site). This operable unit (OU1) represents the first of two operable units planned for the Site. This operable unit addresses the source areas (lagoons and surrounding impacted soils) at the Site and actions needed to ensure that the source areas do not pose a threat to human health or the environment, including any potential cross media impacts to groundwater.

  5. Private-Sector Cleanup Expenditures and Transaction Costs at 18 Superfund Sites (1993)

    Science.gov (United States)

    Superfund allows the government either to clean up a site and recover its cost from the potentially responsible parties (PRPs) or to require the PRPs to undertake the cleanup themselves. This study examines private-sector expenditures and transaction-costs

  6. Remediating MGP brownfields

    International Nuclear Information System (INIS)

    Larsen, B.R.

    1997-01-01

    Before natural gas pipelines became widespread in this country, gas fuel was produced locally in more than 5,000 manufactured gas plants (MGPs). The toxic wastes from these processes often were disposed onsite and have since seeped into the surrounding soil and groundwater. Although the MGPs--commonly called gas plants, gas-works or town gas plants--have closed and most have been demolished, they have left a legacy of environmental contamination. At many MGP sites, underground storage tanks were constructed of wood or brick, with process piping and equipment which frequently leaked. Waste materials often were disposed onsite. Releases of coal tars, oils and condensates produced within the plants contributed to a wide range of contamination from polycyclic aromatic hydrocarbons, phenols, benzene and cyanide. Remediation of selected MGP sites has been sporadic. Unless the site has been identified as a Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) Superfund site, the regulatory initiative to remediate often remains with the state in which the MGP is located. A number of factors are working to change that picture and to create a renewed interest in MGP site remediation. The recent Brownfield Initiative by the US Environmental Protection Agency (EPA) is such an example

  7. Superfund Record of Decision (EPA Region 2): Ramapo Landfill Site, Rockland County, NY. (First remedial action), March 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 60-acre former landfill site is located on a 96-acre tract in the Town of Ramapo, Rockland County, New York, about 35 miles northwest of New York City. Utility corridors lie on three sides of the site, including high-voltage power transmission lines. The site is currently being used as a compaction and transfer facility by the Town of Ramapo. Trash and debris are weighed at a weigh station/guardhouse, compacted at a baler facility in the northeastern corner of the site, and transferred to the Al Turi Landfill in Goshen, New York. The ROD represents the entire remedial action for the site by controlling source of contamination and the generation of leachate, and treatment of contaminated ground water. The primary contaminants of concern affecting soil, ground water, and surface water are VOCs, including benzene; other organics; and metals, including arsenic, chromium, and lead. The selected remedial action for the site is included

  8. Topical Day on Site Remediation

    Energy Technology Data Exchange (ETDEWEB)

    Vandenhove, H [ed.

    1996-09-18

    Ongoing activities at the Belgian Nuclear Research Centre relating to site remediation and restoration are summarized. Special attention has been paid to the different phases of remediation including characterization, impact assessment, evaluation of remediation actions, and execution of remediation actions.

  9. Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

    International Nuclear Information System (INIS)

    Deeb, Rula A.; Hawley, Elisabeth L.

    2013-01-01

    The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-term management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate

  10. Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

    Energy Technology Data Exchange (ETDEWEB)

    Deeb, Rula A.; Hawley, Elisabeth L. [ARCADIS, U.S., 2000 Powell St., 7th Floor, Emeryville, California 94608 (United States)

    2013-07-01

    The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-term management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed

  11. Site remediation: The naked truth

    International Nuclear Information System (INIS)

    Calloway, J.M.

    1991-01-01

    The objective of any company faced with an environmental site remediation project is to perform the cleanup effectively at the lowest possible cost. Today, there are a variety of techniques being applied in the remediation of sites involving soils and sludges. The most popular include: stabilization, incineration, bioremediation and off-site treatment. Dewatering may also play an integral role in a number of these approaches. Selecting the most cost-effective technique for remediation of soils and sludges can be a formidable undertaking, namely because it is often difficult to quantify certain expenses in advance of the project. In addition to providing general cost guidelines for various aspects of soil and sludge remediation, this paper will show how some significant cost factors can be affected by conditions related to specific remediation projects and the cleanup technology being applied

  12. Superfund Record of Decision (EPA Region 2): Woodland Township Route 72 site, Burlington County, New Jersey (first remedial action), May 16, 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The 12-acre Woodland Route 72 Dump site is an abandoned hazardous waste dump in Woodland Township, Burlington County, New Jersey. The site is being remediated concurrently with another abandoned dump. Several chemical manufacturing firms dumped chemicals and other wastes into trenches and lagoons or burned the waste at the sites from the early 1950s to 1962. The primary contaminants of concern affecting the surface soil, sediment, sludge, debris, and ground water are VOCs including benzene, toluene, TCE and xylenes; organics including PAHs, pesticides, and phenols; radionuclides (e.g., uranium and thorium series); and metals including lead and chromium. The selected remedial action for the site includes excavation, further characterization, and offsite disposal at a permitted facility of 54,000 cubic yards (total from both sites) of contaminated surface soil, sludges, debris and sediment; offsite disposal of 19 cubic yards (total from both sites) of radiologically contaminated surface materials including a drum of radioactive pellets; ground water pumping and treatment with treatment to be determined during design. The total estimated present worth cost for the concurrent remedial actions at the Route 72 and Route 532 sites is $142,200,000

  13. Biomonitoring for metal contamination near two Superfund sites in Woburn, Massachusetts, using phytochelatins

    International Nuclear Information System (INIS)

    Gawel, James E.; Hemond, Harold F.

    2004-01-01

    Characterizing the spatial extent of groundwater metal contamination traditionally requires installing sampling wells, an expensive and time-consuming process in urban areas. Moreover, extrapolating biotic effects from metal concentrations alone is problematic, making ecological risk assessment difficult. Our study is the first to examine the use of phytochelatin measurements in tree leaves for delimiting biological metal stress in shallow, metal-contaminated groundwater systems. Three tree species (Rhamnus frangula, Acer platanoides, and Betula populifolia) growing above the shallow groundwater aquifer of the Aberjona River watershed in Woburn, Massachusetts, display a pattern of phytochelatin production consistent with known sources of metal contamination and groundwater flow direction near the Industri-Plex Superfund site. Results also suggest the existence of a second area of contaminated groundwater and elevated metal stress near the Wells G and H Superfund site downstream, in agreement with a recent EPA ecological risk assessment. Possible contamination pathways at this site are discussed

  14. Fifteen years of Superfund at South Valley: Reengineering required

    International Nuclear Information System (INIS)

    Cormier, J.; Horak, F.

    1995-01-01

    It is no surprise to many of Superfund's practitioners that the law and its application are flawed. The South Valley Superfund Site in Albuquerque, New Mexico has not escaped Superfund's problems. The problems and issues arising out of the South Valley Superfund site have spurred the desire to seek a better way to administer and manage cleanup. This new method applies organizational and role changes that bring Superfund closer to an efficient business-like entity. This ''Reengineered'' Superfund strives for reorganization, contractor reduction, improved communication, reporting reduction, and teaming. In addition, modifications are made to the roles of regulators, potentially responsible parties (PRPs), and the public. Today the site encompasses roughly one square mile in area, includes six identified contaminant sources, and deals with solvent and petroleum by-product contamination

  15. Cleanups In My Community (CIMC) - Federal facilities that are also Superfund sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — Federal facilities are properties owned by the federal government. This data layer provides access to Federal facilities that are Superfund sites as part of the CIMC...

  16. The role of innovative remediation technologies

    International Nuclear Information System (INIS)

    Doesburg, J.M.

    1992-05-01

    There are currently over 1200 sites on the US Superfund's National Priorities List (NPL) of hazardous waste sites, and there are over 30, 000 sites listed by the Comprehensive Environmental Responsibility, Compensation and Liability Information System (CERCLIS). The traditional approach to remediating sites in the US has been to remove the material and place it in a secure landfill, or in the case of groundwater, pump and treat the effluent. These technologies have proven to be very expensive and don't really fix the problem. The waste is just moved from one place to another. In recent years, however, alternative and innovative technologies have been increasingly used in the US to replace the traditional approaches. This paper will focus on just such innovative remediation technologies in the US, looking at the regulatory drivers, the emerging technologies, some of the problems in deploying technologies, and a case study

  17. 1992 update of US EPA's Superfund Innovative Technology Evaluation (SITE) Emerging Technology Program

    International Nuclear Information System (INIS)

    Lewis, N.M.; Barkley, N.P.; Williams, T.

    1992-01-01

    The Superfund Innovative Technology Evaluation (SITE) Emerging Technology Program (ETP) has financially supported further development of bench- and pilot-scale testing and evaluation of innovative technologies for use at hazardous waste sites for five years. The ETP was established under the Superfund Amendments and Reauthorization Act (SARA) of 1986. The ETP complies with the goal of the SITE Program to promote, accelerate and make commercially available the development of alternative/innovative treatment technologies for use at Superfund sites. Technologies are submitted to the ETP through yearly solicitations for Preproposals. Applicants are asked to submit a detailed project proposal and a cooperative agreement application that requires Developer/EPA cost sharing. EPA co-funds selected Developers for one to two years. Second-year funding requires documentation of significant progress during the first year. Facilities, equipment, data collection, performance and development are monitored throughout the project. The US Department of Energy (DOE) and the US Air Force (USAF) are participants in the ETP. DOE has co-funded ETP projects since 1990 and the USAF since 1991. A goal of the ETP is to move developed technologies to the field-demonstration stage. A developer may be considered for participation in the SITE Demonstration Program if performance in the ETP indicates the technology is field-ready for evaluation. Six technology categories: biological, chemical, materials handling, physical, solidification/stabilization and thermal, are presently in the ETP. Technologies of primary interest to EPA are those that can treat complex mixtures of hazardous organic and inorganic contaminants and provide improved solids handling and/or pretreatment. An account of the background and progress of the ETP's first five years is presented in this paper. Technologies currently in the ETP are noted, and developers and EPA Project Managers, are listed. 4 refs., 11 figs., 6 tabs

  18. 75 FR 81269 - Ward Transformer Superfund Site Raleigh, Wake County, NC; Notice of Settlements

    Science.gov (United States)

    2010-12-27

    ... ENVIRONMENTAL PROTECTION AGENCY [Docket EPA-RO4-SFUND-2010-1053, FRL-9243-2] Ward Transformer... entered into a five settlements for reimbursement of past response costs concerning the Ward Transformer... Docket ID No. EPA-RO4- SFUND-2010-1053 or Site name Ward Transformer Superfund Site by one of the...

  19. Recycling abandoned lead battery sites

    International Nuclear Information System (INIS)

    Montgomery, A.H.

    1993-01-01

    In the past, automobile batteries were recycled principally for their lead content. The waste generated at battery wrecking facilities consisted of spent acid, crushed casings (ebonite and plastic), and where secondary smelting was involved, matte, slag, and carbon from the smelting process. These waste products were generally disposed in an on-site in a landfill or stored in piles. If the facility shut down because further commercial operations were not financially viable, the waste piles remained to be addressed at a later date through remedial action or reclamation programs. There are many of these facilities in the US. Nationally, about 28 sites have been discovered by the US Environmental Protection Agency (EPA) under the Superfund program and are under investigation or administrative orders for remedial action. A major remediation effort is now underway at the Gould Superfund Site in Portland, Oregon, which was operated as a secondary smelting facility between 1949 and 1981. This paper describes the nature of the contamination at the Gould site and the work conducted by Canonie Environmental Services Corp. (Canonie) to develop a process which would treat the waste from battery wrecking operations and produce revenue generating recyclable products while removing the source contamination (lead) from the site. The full-scale commercial plant is now operating and is expected to achieve a throughput rate of between 200 and 250 tons per day in the coming weeks

  20. Superfund XV conference proceedings. Volume 1

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This conference was held November 29--December 1, 1994 in Washington, D.C..The purpose of this conference was to provide a forum for exchange of state-of-the-art information on Superfund. Papers are included on the following topics: bioremediation; building decontamination; environmental policy issues; federal environmental restoration; groundwater remediation; innovative sampling and analytical technologies; laboratory methods; metals management; mixed wastes; PCB waste management; remediation technology and case studies; and risk assessment. Individual papers have been processed separately for inclusion in the appropriate data bases

  1. Remediation management of complex sites using an adaptive site management approach.

    Science.gov (United States)

    Price, John; Spreng, Carl; Hawley, Elisabeth L; Deeb, Rula

    2017-12-15

    Complex sites require a disproportionate amount of resources for environmental remediation and long timeframes to achieve remediation objectives, due to their complex geologic conditions, hydrogeologic conditions, geochemical conditions, contaminant-related conditions, large scale of contamination, and/or non-technical challenges. A recent team of state and federal environmental regulators, federal agency representatives, industry experts, community stakeholders, and academia worked together as an Interstate Technology & Regulatory Council (ITRC) team to compile resources and create new guidance on the remediation management of complex sites. This article summarizes the ITRC team's recommended process for addressing complex sites through an adaptive site management approach. The team provided guidance for site managers and other stakeholders to evaluate site complexities and determine site remediation potential, i.e., whether an adaptive site management approach is warranted. Adaptive site management was described as a comprehensive, flexible approach to iteratively evaluate and adjust the remedial strategy in response to remedy performance. Key aspects of adaptive site management were described, including tools for revising and updating the conceptual site model (CSM), the importance of setting interim objectives to define short-term milestones on the journey to achieving site objectives, establishing a performance model and metrics to evaluate progress towards meeting interim objectives, and comparing actual with predicted progress during scheduled periodic evaluations, and establishing decision criteria for when and how to adapt/modify/revise the remedial strategy in response to remedy performance. Key findings will be published in an ITRC Technical and Regulatory guidance document in 2017 and free training webinars will be conducted. More information is available at www.itrc-web.org. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. Aquatic assessment of the Ely Copper Mine Superfund site, Vershire, Vermont

    Science.gov (United States)

    Seal, Robert R.; Kiah, Richard G.; Piatak, Nadine M.; Besser, John M.; Coles, James F.; Hammarstrom, Jane M.; Argue, Denise M.; Levitan, Denise M.; Deacon, Jeffrey R.; Ingersoll, Christopher G.

    2010-01-01

    The Ely Mine, which operated from 1821 to 1905, and its area of downstream impact constitute the Ely Copper Mine Superfund site. The site was placed on the National Priorities List in 2001. The mine comprises underground workings, foundations from historical structures, several waste-rock piles, roast beds associated with the smelting operation, and slag piles resulting from the smelting. The mine site is drained by Ely Brook, which includes several tributaries, one of which drains a series of six ponds. Ely Brook empties into Schoolhouse Brook, which flows 3.3 kilometers and joins the Ompompanoosuc River.

  3. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse...

  4. French uranium mining sites remediation

    International Nuclear Information System (INIS)

    Roche, M.

    2002-01-01

    Following a presentation of the COGEMA's general policy for the remediation of uranium mining sites and the regulatory requirements, the current phases of site remediation operations are described. Specific operations for underground mines, open pits, milling facilities and confining the milled residues to meet long term public health concerns are detailed and discussed in relation to the communication strategies to show and explain the actions of COGEMA. A brief review of the current remediation situation at the various French facilities is finally presented. (author)

  5. Pump-and-treat is not the only solution to aquifer remediation

    International Nuclear Information System (INIS)

    Odermatt, J.R.

    1994-01-01

    The Environmental Protection Agency (EPA) recently surveyed remediation technologies used at petroleum-contaminated sites in 22 states. About 96 percent of underground storage tank (UST) corrective action sites used some form of pump-and-treat technology to remediate contaminated groundwater. However, using only pump-and-treat technology is not a cost-effective approach to aquifer remediation. Pump-and-treat may be more appropriate for containing plumes or for use in initial emergency response actions at sites and massive NAPL releases to groundwater. As of 1990, 68 percent of Superfund records of decision selected pump-and-treat as the final remedy for aquifer remediation. However, of 13 sites where the remedial alternative objective was to restore the aquifer to health-based levels, only one pump-and-treat method has succeeded. Except in cases where human health and the environment are threatened, long-term active technologies, such as pump-and-treat, may not be warranted. Groundwater monitoring and possible wellhead treatment may be perceived as time-consuming processes; however, at many sites, this long-term approach may be far less costly and just as effective as other long-term strategies based on exclusive use of pump-and-treat technology

  6. 77 FR 40318 - Availability of Addendum to Documentation Supporting the Proposal of the Leeds Metal Site to the...

    Science.gov (United States)

    2012-07-09

    ... policy is that all comments received will be included in the public Docket without change and may be made..., email: [email protected] , Site Assessment and Remedy Decisions Branch, Assessment and Remediation Division, Office of Superfund Remediation and Technology Innovation (Mail Code 5204P), U.S. Environmental...

  7. Site remediation techniques in India: a review

    International Nuclear Information System (INIS)

    Anomitra Banerjee; Miller Jothi

    2013-01-01

    India is one of the developing countries operating site remediation techniques for the entire nuclear fuel cycle waste for the last three decades. In this paper we intend to provide an overview of remediation methods currently utilized at various hazardous waste sites in India, their advantages and disadvantages. Over the years the site remediation techniques have been well characterized and different processes for treatment, conditioning and disposal are being practiced. Remediation Methods categorized as biological, chemical or physical are summarized for contaminated soils and environmental waters. This paper covers the site remediation techniques implemented for treatment and conditioning of wastelands arising from the operation of nuclear power plant, research reactors and fuel reprocessing units. (authors)

  8. Hanford Site Tank Waste Remediation System

    International Nuclear Information System (INIS)

    1993-05-01

    The US Department of Energy's (DOE) Hanford Site in southeastern Washington State has the most diverse and largest amount of highly radioactive waste of any site in the US. High-level radioactive waste has been stored in large underground tanks since 1944. A Tank Waste Remediation System Program has been established within the DOE to safely manage and immobilize these wastes in anticipation of permanent disposal in a geologic repository. The Hanford Site Tank Waste Remediation System Waste Management 1993 Symposium Papers and Viewgraphs covered the following topics: Hanford Site Tank Waste Remediation System Overview; Tank Waste Retrieval Issues and Options for their Resolution; Tank Waste Pretreatment - Issues, Alternatives and Strategies for Resolution; Low-Level Waste Disposal - Grout Issue and Alternative Waste Form Technology; A Strategy for Resolving High-Priority Hanford Site Radioactive Waste Storage Tank Safety Issues; Tank Waste Chemistry - A New Understanding of Waste Aging; Recent Results from Characterization of Ferrocyanide Wastes at the Hanford Site; Resolving the Safety Issue for Radioactive Waste Tanks with High Organic Content; Technology to Support Hanford Site Tank Waste Remediation System Objectives

  9. TECHNOLOGY EVALUATION REPORT, SITE PROGRAM DEMONSTRATION TEST: SHIRCO PILOT-SCALE INFRARED INCINERATION SYSTEM ROSE TOWNSHIP DEMODE ROAD SUPERFUND SITE - VOLUME II

    Science.gov (United States)

    The performance of the Shirco pilot-scale infrared thermal destruction system has been evaluated at the Rose Township, Demode Road Superfund Site and is presented in the report. The waste tested consisted of solvents, organics and heavy metals in an illegal dump site. Volume I gi...

  10. 75 FR 53694 - Florida Petroleum Reprocessors Superfund Site; Davie, Broward County, FL; Notice of Settlement

    Science.gov (United States)

    2010-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY [Docket EPA-RO4-SFUND-2010-0729, FRL-9196-1] Florida Petroleum... entered into a settlement for reimbursement of past response costs concerning the Florida Petroleum... No. EPA-RO4- SFUND-2010-0729 or Site name Florida Petroleum Reprocessors Superfund Site by one of the...

  11. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites

  12. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  13. Salmon Site Remedial Investigation Report

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  14. Voluntary program promotes equitable and expedited remediation of contaminated properties

    Energy Technology Data Exchange (ETDEWEB)

    Wolfenden, A.K.; Cambridge, M. [California Environmental Protection Agency, Sacramento, CA (United States). Dept. of Toxic Substances Control

    1995-12-31

    In California, the California Environmental Protection Agency (Cal/EPA) has developed a more equitable and expedited approach for the redevelopment of sites contaminated with hazardous substances. Senate Bill 923 enacted in 1994, established the Expedited Remedial Action Program (ERAP) under Chapter 6.85 of the California Health and Safety Code. This bill responds to a nationwide demand to reform Superfund laws and promote the restoration of blighted and contaminated parcels--often referred to as Brownfields. The program was designed as an alternative to CERCLA, which has come under criticism for being inefficient, unfair and restricting opportunities for effective cleanups. Cal/EPA`s Department of Toxic Substances Control will implement this pilot program. This pilot program, which will eventually comprise 30 sites, provides incentives for voluntary remediation by addressing key economic issues associated with the remediation and redevelopment of contaminated properties.

  15. Superfund Record of Decision (EPA Region 4): Maxey Flats Nuclear Disposal site, Fleming County, KY. (First remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 280-acre Maxey Flats Nuclear Disposal site is an inactive low-level radioactive waste disposal facility in Fleming County, Kentucky. The estimated 663 people who reside within 2.5 miles of the site use the public water supply for drinking purposes. From 1962 to 1977, Nuclear Engineering Company, Inc. (NECO), operated a solid by-product, source, and special nuclear material disposal facility under a license with the State. Several State investigations in the 1970's revealed that leachate contaminated with tritium and other radioactive substances was migrating from the disposal trenches to unrestricted areas. The Record of Decision (ROD) addresses final remediation of soil, debris, and associated leachate. The primary contaminants of concern affecting the soil and debris are VOCs including benzene, TCE, and toluene; metals including arsenic and lead; and radioactive materials. The selected remedial action for the site is included

  16. A General Chemistry Assignment Analyzing Environmental Contamination for the Depue, IL, National Superfund Site

    Science.gov (United States)

    Saslow Gomez, Sarah A.; Faurie-Wisniewski, Danielle; Parsa, Arlen; Spitz, Jeff; Spitz, Jennifer Amdur; Loeb, Nancy C.; Geiger, Franz M.

    2015-01-01

    The classroom exercise outlined here is a self-directed assignment that connects students to the environmental contamination problem surrounding the DePue Superfund site. By connecting chemistry knowledge gained in the classroom with a real-world problem, students are encouraged to personally connect with the problem while simultaneously…

  17. Process for determining the remediation category of hazardous substance sites

    International Nuclear Information System (INIS)

    Sieben, A.K.

    1994-01-01

    An evaluation process has been developed that aids in selecting the appropriate remediation category of hazardous substance sites. Three general remediation categories have been established: No further Action: Potential Early Action: and Defer for RI/FS or Transition/Decontamination and Decommissioning. This evaluation method is a preliminary screening process only and will not identify the most appropriate remediation alternative for each site. The remedy selection process can proceed only after a remediation category is determined for each site. All sites are evaluated at a preliminary screening level to determine the general remediation category. After the first screen, a secondary evaluation is performed on both the PEA sites and the DEFER sites. For PEAs, this secondary evaluation will incorporate additional specific factors, such as a screening level risk assessment. For the DEFER sites feasibility factors will be used to distinguish between the sites which should undergo a normal RI/FS and the sites which will be recommended to be remediated in association with D ampersand D of buildings. Ultimately, all of the sites will be placed into one of four remediation categories

  18. Developing Sediment Remediation Goals at Superfund Sites Based on Pore Water for the Protection of Benthic Organisms from Direct Toxicity to Non-ionic Organic Contaminants

    Science.gov (United States)

    A methodology for developing remediation goals for sites with contaminated sediments is provided. The remediation goals are based upon the concentrations of chemicals in the sediment interstitial water measured using the passive sampling technique. The passive sampling technique ...

  19. Superfund Record of Decision (EPA Region 5): Buckeye Reclamation Landfill Site, Belmont County, OH. (First remedial action), August 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 658-acre Buckeye Reclamation site contains a 50-acre former landfill in Richland Township, Belmont County, Ohio. Land use in the area is predominantly agricultural, rural residential, and strip mining. A total of 46 domestic wells and springs are located within 1 mile of the site. The original topography of the valley has been altered by coal mining and landfill operations. Solid industrial wastes also were disposed of with municipal wastes elsewhere in the landfill. In 1980, the Waste Pit was filled with sludge, mine spoil, and overburden soil; covered with soil and garbage; and seeded. Results of the RI indicate various levels of contamination in all media sampled, except air. The Record of Decision (ROD) addresses the remediation of contaminated leachate and ground water and eliminates exposure to contaminated surface soil. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, TCE, and toluene; other organics including PAHs; and metals including arsenic, chromium, beryllium, and lead. The selected remedial action for the site is included

  20. 78 FR 76143 - Proposed CERCLA Settlement Relating to the Paul's Tank Cleaning Service Superfund Site...

    Science.gov (United States)

    2013-12-16

    ... Paul's Tank Cleaning Service Superfund Site, Burlington County, New Jersey AGENCY: Environmental.... (``Settling Party''). The Settling Party is a potentially responsible party, pursuant to Section 107(a) of CERCLA, and thus is potentially liable for response costs incurred at or in connection Paul's Tank...

  1. Superfund record of decision (EPA Region 4): Whitehouse Waste Oil Pits Site, Duval County, Jacksonville, FL. (First remedial action), (Amendment), June 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 7-acre Whitehouse Waste Oil Pits site was used by Allied Petroleum Products (Allied) to dispose of acidic waste oil sludges from its oil reclamation process in Whitehouse, Duval County, Florida. A cypress swamp system and residential area are immediately adjacent to the site. The acid sludge produced in the first step and clay used to decolorize the oil were dumped into the unlined pits at the site. A 1985 ROD addressed source control as a containment remedy consisting of a slurry wall construction, soil cap, and a ground water recovery and treatment system; however, EPA has re-evaluated the 1985 ROD selection and determined that the containment remedy failed to meet the requirements of SARA. As a result, the ROD Amendment focuses on an alternative for treating Whitehouse wastes by eliminating direct contact risk associated with pit soil/sludge wastes and preventing contaminated ground water in the surficial aquifer from migrating laterally. The primary contaminants of concern that affect the soil, sediment, surface water, and ground water are VOCs, including benzene, toluene, and xylenes; organics, including PCBs and phenols; and metals, including arsenic, chromium, and lead. The amended remedial action for the site are included

  2. Status report: Fernald site remediation

    International Nuclear Information System (INIS)

    Craig, J.R. Jr.; Saric, J.A.; Schneider, T.; Yates, M.K.

    1995-01-01

    The Fernald site is rapidly transitioning from a Remedial Investigation/ Feasibility Study (RI/FS) site to one where design and construction of the remedies dominates. Fernald is one of the first sites in the Department of Energy (DOE) complex to accomplish this task and real physical progress is being made in moving the five operable units through the CERCLA process. Two of the required Records of Decision (ROD) are in hand and all five operable units will have received their RODs (IROD for OU3) by the end of 1995. Pre-design investigations, design work or construction are now in progress on the operable units. The lessons learned from the work done to date include implementing innovations in the RI and FS process as well as effective use of Removal Actions to begin the actual site remediation. Also, forging close working relationships with the Federal and State Regulators, citizens action groups and the Fernald Citizens Task Force has helped move the program forward. The Fernald successes have been achieved by close coordination and cooperation among all groups working on the projects and by application of innovative technologies within the decision making process

  3. 77 FR 21433 - Regulated Navigation Area; Pacific Sound Resources and Lockheed Shipyard EPA Superfund Cleanup...

    Science.gov (United States)

    2012-04-10

    ... superfund cleanup remediation efforts. This RNA will prohibit activities that would disturb the seabed, such... or capped are arsenic, copper, lead, mercury, zinc, PAHs and PCBs. The metal contaminants were... installed in the designated regulated navigation area, pursuant to the remediation efforts of the U.S...

  4. Challenge of superfund community relations

    International Nuclear Information System (INIS)

    Goldman, N.J.

    1991-01-01

    Conducting a community relations effort in a community which is home to a Superfund site is a formidable challenge. Any education press, however appropriate, quickly falls victim to doubt, mistrust of fears of the very public intended to be served by the effort. While each site is uniquely different, the issues raised by affected communities in one part of the country are strikingly similar to those raised in other parts. Those most involved must join those most affected in seeking meaningful solutions and in building the trust that is so vital in moving forward with Superfund

  5. Occurrences and fate of DDT principal isomers/metabolites, DDA, and o,p'-DDD enantiomers in fish, sediment and water at a DDT-impacted Superfund site.

    Science.gov (United States)

    Garrison, A W; Cyterski, M; Roberts, K D; Burdette, D; Williamson, J; Avants, J K

    2014-11-01

    In the 1950s and 60s, discharges from a DDT manufacturing plant contaminated a tributary system of the Tennessee River near Huntsville, Alabama, USA. Regulatory action resulted in declaring the area a Superfund site which required remediation and extensive monitoring. Monitoring data collected from 1988, after remediation, through 2011 showed annual decreases approximating first-order decay in concentrations of total DDT and its six principal congeners (p,p'-DDT, o,p'-DDT, p,p'-DDD, o,p'-DDD, p,p'-DDE and o,p'-DDE) in filets from three species of fish. As of 2013, these concentrations met the regulatory requirements of 5 mg/kg or less total DDT for each fish tested. The enantiomer fractions (EF) of chiral o,p'-DDD in smallmouth buffalo and channel catfish were always below 0.5, indicating preferential decay of the (+)-enantiomer of this congener; this EF did not change significantly over 15 years. The often-neglected DDT metabolite p,p'-DDA was found at a concentration of about 20 μg/l in the ecosystem water. Published by Elsevier Ltd.

  6. Treatability Study of In Situ Technologies for Remediation of Hexavalent Chromium in Groundwater at the Puchack Well Field Superfund Site, New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    Vermeul, Vince R.; Szecsody, Jim E.; Truex, Michael J.; Burns, Carolyn A.; Girvin, Donald C.; Phillips, Jerry L.; Devary, Brooks J.; Fischer, Ashley E.; Li, Shu-Mei W.

    2006-11-13

    This treatability study was conducted by Pacific Northwest National Laboratory (PNNL), at the request of the U. S. Environmental Protection Agency (EPA) Region 2, to evaluate the feasibility of using in situ treatment technologies for chromate reduction and immobilization at the Puchack Well Field Superfund Site in Pennsauken Township, New Jersey. In addition to in situ reductive treatments, which included the evaluation of both abiotic and biotic reduction of Puchack aquifer sediments, natural attenuation mechanisms were evaluated (i.e., chromate adsorption and reduction). Chromate exhibited typical anionic adsorption behavior, with greater adsorption at lower pH, at lower chromate concentration, and at lower concentrations of other competing anions. In particular, sulfate (at 50 mg/L) suppressed chromate adsorption by up to 50%. Chromate adsorption was not influenced by inorganic colloids.

  7. Expedited remedial action -- A promising opportunity at your doorstep

    Energy Technology Data Exchange (ETDEWEB)

    Newman, E.R.

    1996-12-31

    The Expedited Remedial Action Program or ERAP carries great promise and is limited to no more than 30 sites, there are a number of slots now available, and the legislature will soon be considering a reauthorization of the full state Superfund program, which expires in June 1998, to reportedly be based to a great extent on the ERAP model. The ERAP provides for: (1) The early identification of fair and equitable shares of liability, including an orphan share, where appropriate, to be paid by the state; (2) The elimination of all joint and several liability; (3) Cleanup levels and remedies based on the foreseeable planned use of the site; (4) Site specific risk assessments based on the latest risk assessment protocols; (5) Use of an arbitrator to quickly resolve all significant liability and technical disputes; and (6) Broad and timely releases from future liability upon completion of cleanup.

  8. SUPERFUND TREATABILITY CLEARINGHOUSE: BDAT FOR SOLIDIFICATION/STABILIZATION TECHNOLOGY FOR SUPERFUND SOILS (DRAFT FINAL REPORT)

    Science.gov (United States)

    This report evaluates the performance of solidification as a method for treating solids from Superfund sites. Tests were conducted on four different artificially contaminated soils which are representative of soils found at the sites. Contaminated soils were solidified us...

  9. US EPA record of decision review for landfills: Sanitary landfill (740-G), Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report presents the results of a review of the US Environmental Protection Agency (EPA) Record of Decision System (RODS) database search conducted to identify Superfund landfill sites where a Record of Decision (ROD) has been prepared by EPA, the States or the US Army Corps of Engineers describing the selected remedy at the site. ROD abstracts from the database were reviewed to identify site information including site type, contaminants of concern, components of the selected remedy, and cleanup goals. Only RODs from landfill sites were evaluated so that the results of the analysis can be used to support the remedy selection process for the Sanitary Landfill at the Savannah River Site (SRS).

  10. US EPA record of decision review for landfills: Sanitary landfill (740-G), Savannah River Site

    International Nuclear Information System (INIS)

    1993-06-01

    This report presents the results of a review of the US Environmental Protection Agency (EPA) Record of Decision System (RODS) database search conducted to identify Superfund landfill sites where a Record of Decision (ROD) has been prepared by EPA, the States or the US Army Corps of Engineers describing the selected remedy at the site. ROD abstracts from the database were reviewed to identify site information including site type, contaminants of concern, components of the selected remedy, and cleanup goals. Only RODs from landfill sites were evaluated so that the results of the analysis can be used to support the remedy selection process for the Sanitary Landfill at the Savannah River Site (SRS)

  11. 76 FR 24479 - In the Matter of the Taylor Lumber and Treating Superfund Site, Sheridan, Oregon, Amendment to...

    Science.gov (United States)

    2011-05-02

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9300-9] In the Matter of the Taylor Lumber and Treating... Taylor Lumber and Treating Site, which PWPO was acquiring, in exchange for several obligations related to...-553- 0705. Comments should reference the Taylor Lumber and Treating Superfund Site in Sheridan, Oregon...

  12. CERCLA site assessment workbook, Volume 1

    International Nuclear Information System (INIS)

    1994-08-01

    This workbook provides instructions for planning, implementing, and reporting site assessments under CERCLA, commonly referred to as Superfund. Site assessment consists of two information-gathering steps: the remedial preliminary assessment (PA) and the site inspection (SI). The information obtained is then used to estimate, or score, a site's relative risk to public health and the environment. The score is derived via the hazard ranking system (HRS). Although the workbook and its exercises can be adapted to group study, it is designed primarily for use by an individual

  13. Issuance of Final Guidance: Ecological Risk Assessment and Risk Management Principles for Superfund Sites, October 7, 1999

    Science.gov (United States)

    This guidance is intended to help Superfund risk managers make ecological risk management decisions that are based on sound science, consistent across Regions, and present a characterization of site risks that is transparent to the public.

  14. Waste minimization applications at a remediation site

    International Nuclear Information System (INIS)

    Allmon, L.A.

    1995-01-01

    The Fernald Environmental Management Project (FEMP) owned by the Department of Energy was used for the processing of uranium. In 1989 Fernald suspended production of uranium metals and was placed on the National Priorities List (NPL). The site's mission has changed from one of production to environmental restoration. Many groups necessary for producing a product were deemed irrelevant for remediation work, including Waste Minimization. Waste Minimization does not readily appear to be applicable to remediation work. Environmental remediation is designed to correct adverse impacts to the environment from past operations and generates significant amounts of waste requiring management. The premise of pollution prevention is to avoid waste generation, thus remediation is in direct conflict with this premise. Although greater amounts of waste will be generated during environmental remediation, treatment capacities are not always available and disposal is becoming more difficult and costly. This creates the need for pollution prevention and waste minimization. Applying waste minimization principles at a remediation site is an enormous challenge. If the remediation site is also radiologically contaminated it is even a bigger challenge. Innovative techniques and ideas must be utilized to achieve reductions in the amount of waste that must be managed or dispositioned. At Fernald the waste minimization paradigm was shifted from focusing efforts on source reduction to focusing efforts on recycle/reuse by inverting the EPA waste management hierarchy. A fundamental difference at remediation sites is that source reduction has limited applicability to legacy wastes but can be applied successfully on secondary waste generation. The bulk of measurable waste reduction will be achieved by the recycle/reuse of primary wastes and by segregation and decontamination of secondary wastestreams. Each effort must be measured in terms of being economically and ecologically beneficial

  15. In situ soil remediation using electrokinetics

    International Nuclear Information System (INIS)

    Buehler, M.F.; Surma, J.E.; Virden, J.W.

    1994-11-01

    Electrokinetics is emerging as a promising technology for in situ soil remediation. This technique is especially attractive for Superfund sites and government operations which contain large volumes of contaminated soil. The approach uses an applied electric field to induce transport of both radioactive and hazardous waste ions in soil. The transport mechanisms include electroosmosis, electromigration, and electrophoresis. The feasibility of using electrokinetics to move radioactive 137 Cs and 60 Co at the Hanford Site in Richland, Washington, is discussed. A closed cell is used to provide in situ measurements of 137 Cs and 60 Co movement in Hanford soil. Preliminary results of ionic movement, along with the corresponding current response, are presented

  16. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies

  17. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  18. 77 FR 58989 - Proposed CERCLA Administrative Cost Recovery Settlement for the Buckbee-Mears Co. Superfund Site...

    Science.gov (United States)

    2012-09-25

    ... paid $150,000 attributable to the costs of marketing and selling the Properties; (b) The Bank will pay... ENVIRONMENTAL PROTECTION AGENCY [FRL-9720-7] Proposed CERCLA Administrative Cost Recovery... costs concerning the Buckbee-Mears Co. Superfund Site located in Cortland, Cortland County, New York...

  19. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, Christopher [U.S Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S Department of Energy Office of Legacy Management, Westminster, Colorado; Widdop, Michael; Gillespie, Joey [SM Stoller Corporation, Grand Junction, Colorado

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with the U

  20. Funding a California Superfund site with minimal state or federal money

    International Nuclear Information System (INIS)

    Mullaney, M.; Lemcke, H.

    1996-01-01

    The remediation of abandoned waste sites is a difficult task with limited funding from local, state and federal governments. It has become necessary for site managers and property owners to locate novel sources of funding and services to remediate these sites. An example of such a site is Pacific States Steel Corporation (PSSC) in Union City, California. PSSC abruptly closed its doors in 1978. The former employees (pensioners) of PSSC, won a civil suit in Federal Court for reinstatement of their medical benefits. The Federal Court took control of PSSC's largest remaining asset: a 93 acre site which was covered with slag, dilapidated buildings, a petroleum contaminated cooling pond, asbestos, PCBs, 800 barrels containing unknown fluids, heavy metals, non hazardous solid waste, and other wastes. A court-appointed Special Master submitted to the Court a plan to clean up and develop the 93 acre site to its highest and best use in order to pay the pensioners and other creditors. Total cleanup costs were estimated at over $30 million. Currently, approximately 31 acres are ready for development and 62 acres have all but two structures removed. All above ground waste streams have been remediated or contained

  1. 76 FR 20546 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-04-13

    ...'s Dump Superfund Site. Remedial Investigation and Feasibility Study (RI/FS) The Remedial... Investigation Report and Risk Assessment for both the Spiegelberg and Rasmussen's Dump Superfund sites due to... and operating an on-site pump and treat treatment pilot plant. Construction activities included: site...

  2. Remediation of the Maxey Flats Site

    International Nuclear Information System (INIS)

    1990-01-01

    This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets

  3. HISTORY AND ACCOMPLISHMENTS OF THE US EPA'S SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION (SITE) MONITORING AND MEASUREMENT (MMT) PROGRAM

    Science.gov (United States)

    This manuscript presents the history and evolution of the U.S. Environmental Protection Agency's (EPA) Superfund Innovative Technology Evaluation (SITE) Monitoring and Measurement Technology (MMT) Program. This includes a discussion of how the fundamental concepts of a performanc...

  4. CO2 Sparging Proof of Concept Test Report, Revision 1, LCP Chemicals Site, Brunswick, Georgia

    Science.gov (United States)

    April 2013 report to evaluate the feasibility of CO2 sparging to remediate a sub-surface caustic brine pool (CBP) at the LCP Chemicals Superfund Site, GA. Region ID : 04, DocID: 10940639 , DocDate: 2013-04-01

  5. Remediation of sites with dispersed radioactive contamination

    International Nuclear Information System (INIS)

    2004-01-01

    To respond to the needs of Member States, the IAEA launched an environmental remediation project to deal with the problems of radioactive contamination worldwide. The IAEA environmental remediation project includes an IAEA Coordinated Research Project, as well as the participation of IAEA experts in concrete remediation projects when requested by individual Member States. The IAEA has prepared several documents dedicated to particular technical or conceptual areas, including documents on the characterization of contaminated sites, technical and non-technical factors relevant to the selection of a preferred remediation strategy and technique, overview of applicable techniques for environmental remediation,, options for the cleanup of contaminated groundwater and planning and management issues. In addition, a number of other IAEA publications dealing with related aspects have been compiled under different IAEA projects; these include TECDOCs on the remediation of uranium mill tailings, the decontamination of buildings and roads and the characterization of decommissioned sites. Detailed procedures for the planning and implementation of remedial measures have been developed over the past decade or so. A critical element is the characterization of the contamination and of the various environmental compartments in which it is found, in order to be able to evaluate the applicability of remediation techniques. The chemical or mineralogical form of the contaminant will critically influence the efficiency of the remediation technique chosen. Careful delineation of the contamination will ensure that only those areas or volumes of material that are actually contaminated are treated. This, in turn, reduces the amount of any secondary waste generated. The application of a remediation technique requires holistic studies examining the technical feasibility of the proposed measures, including analyses of their impact. Consequently, input from various scientific and engineering

  6. 200-ZP-1 IRM phase 2 and 3 remedial design report, Revision 1

    International Nuclear Information System (INIS)

    1996-07-01

    This 200-ZP-1 remedial design report presents the objectives and rationale developed for the design and implementation of the selected interim remedial measure (IRM) for the 200-ZP-1 Operable Unit, located in the 200 West Area of the Hanford Site.The IRM was chosen in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986, the Hanford Federal Facility Agreement and Consent Order (also known as the Tri- party Agreement), and the National Oil and Hazardous Substance Pollution Contingency Plan

  7. Superfund Record of Decision (EPA Region 3): Southern Maryland Wood Treating Site, Hollywood, Maryland (first remedial action) June 1988. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1988-06-29

    The Southern Maryland Wood Treating (SMWT) site is located in Hollywood, St. Mary's County, Maryland. The site is situated within a wetland area in a drainage divide such that runoff from the site discharges into Brooks Run and McIntosh Run tributaries, which flow into the Potomac River. The area surrounding the site is predominantly used for agricultural and residential purposes. Currently, part of the site is being used as a retail outlet for pretreated lumber and crab traps. The waste generated at the site included retort and cylinder sludges, process wastes, and material spillage. These wastes were in six onsite unlined lagoons. The primary contaminants of concern affecting the onsite ground water, soil, surface water, sediments, and debris include: VOCs, PNA, and base/neutral acid extractables. The selected remedial action for the site is included.

  8. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords

  9. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  10. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  11. Large-scale commercial applications of the in situ vitrification remediation technology

    International Nuclear Information System (INIS)

    Campbell, B.E.; Hansen, J.E.; McElroy, J.L.; Thompson, L.E.; Timmerman, C.L.

    1994-01-01

    The first large-scale commercial application of the innovative In Situ Vitrification (ISV) remediation technology was completed at the Parsons Chemical/ETM Enterprises Superfund site in Michigan State midyear 1994. This project involved treating 4,800 tons of pesticide and mercury-contaminated soil. The project also involved performance of the USEPA SITE Program demonstration test for the ISV technology. The Parsons project involved consolidation and staging of contaminated soil from widespread locations on and nearby the site. This paper presents a brief description of the ISV technology along with case-study type information on these two sites and the performance of the ISV technology on them. The paper also reviews other remediation projects where ISV has been identified as the/a preferred remedy, and where ISV is currently planned for use. These sites include soils contaminated with pesticides, dioxin, PCP, paint wastes, and a variety of heavy metals. This review of additional sites also includes a description of a planned radioactive mixed waste remediation project in Australia that contains large amounts of plutonium, uranium, lead, beryllium, and metallic and other debris buried in limestone and dolomitic soil burial pits. Initial test work has been completed on this application, and preparations are now underway for pilot testing in Australia. This project will demonstrate the applicability of the ISV technology to the challenging application of buried mixed wastes

  12. Superfund record of decision (EPA Region 4): Ciba-Geigy Site (McIntosh Plant), Washington County, McIntosh, AL. (Third remedial action), July 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 1,500-acre Ciba-Geigy site is an active chemical manufacturer in an industrial area in McIntosh, Washington County, Alabama. A wetlands area borders the site property, and part of the site lies within the floodplain of the Tombigbee River. In 1985, EPA issued a RCRA permit that included a corrective action plan requiring Ciba-Geigy to remove and treat ground water and surface water contamination at the site. Further investigations by EPA revealed 11 former waste management areas of potential contamination onsite. These areas contain a variety of waste, debris, pesticide by-products and residues. The ROD addresses a final remedy for OU4, which includes contaminated soil and sludge in former waste management Area 8 and the upper dilute ditch. The primary contaminants of concern affecting the soil, sludge, and debris are VOCs, including benzene, toluene, and xylenes; other organics, including pesticides; metals, including arsenic, chromium, and lead; and inorganics, including cyanide. The selected remedial action for the site are included

  13. Natural Remediation at Savannah River Site

    International Nuclear Information System (INIS)

    Lewis, C. M.; Van Pelt, R.

    2002-01-01

    Natural remediation is a general term that includes any technology or strategy that takes advantage of natural processes to remediate a contaminated media to a condition that is protective of human health and the environment. Natural remediation techniques are often passive and minimally disruptive to the environment. They are generally implemented in conjunction with traditional remedial solutions for source control (i.e., capping, stabilization, removal, soil vapor extraction, etc.). Natural remediation techniques being employed at Savannah River Site (SRS) include enhanced bio-remediation, monitored natural attenuation, and phytoremediation. Enhanced bio-remediation involves making nutrients available and conditions favorable for microbial growth. With proper precautions and feeding, the naturally existing microbes flourish and consume the contaminants. Case studies of enhanced bio-remediation include surface soils contaminated with PCBs and pesticides, and Volatile Organic Compound (VOC) contamination in both the vadose zone and groundwater. Monitored natural attenuation (MNA) has been selected as the preferred alternative for groundwater clean up at several SRS waste units. Successful implementation of MNA has been based on demonstration that sources have been controlled, groundwater modeling that indicates that plumes will not expand or reach surface water discharge points at levels that exceed regulatory limits, and continued monitoring. Phytoremediation is being successfully utilized at several SRS waste units. Phytoremediation involves using plants and vegetation to uptake, break down, or manage contaminants in groundwater or soils. Case studies at SRS include managing groundwater plumes of tritium and VOCs with pine trees that are native to the area. Significant decreases in tritium discharge to a site stream have been realized in one phytoremediation project. Studies of other vegetation types, methods of application, and other target contaminants are

  14. Integrated approach to planning the remediation of sites undergoing decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Responding to the needs of Member States, the IAEA has launched an environmental remediation guidance initiative dealing with the issues of radioactive contamination world wide. Its aim is to collate and disseminate information concerning the key issues affecting environmental remediation of contaminated sites. This IAEA initiative includes the development of documents that report on remediation technologies available, best practices, and information and guidance concerning (a) Strategy development for environmental remediation; (b) Characterization and remediation of contaminated sites and contaminated groundwater; (c) Management of waste and residues from mining and milling of uranium and thorium; (d) Decommissioning of buildings; (e) A database for contaminated sites. The subject of this present report concerns the integration of decommissioning and remediation activities at sites undergoing decommissioning and this fits within the first category of guidance documentation (strategy development). This document addresses key strategic planning issues. It is intended to provide practical advice and complement other reports that focus on decommissioning and remediation at nuclear facilities. The document is designed to encourage site remediation activities that take advantage of synergies with decommissioning in order to reduce the duplication of effort by various parties and minimize adverse impacts on human health, the environment, and costs through the transfer of experience and knowledge. To achieve this objective, the document is designed to help Member States gain perspective by summarizing available information about synergies between decommissioning and remediation, strategic planning and project management and planning tools and techniques to support decision making and remediation. Case studies are also presented as to give concrete examples of the theoretical elements elaborated in the documents. This publication investigates the potential synergies

  15. Technologies for remediation of radioactively contaminated sites

    International Nuclear Information System (INIS)

    1999-06-01

    This report presents particulars on environmental restoration technologies (control and treatment) which can be applied to land based, radioactively contaminated sites. The media considered include soils, groundwater, surface water, sediments, air, and terrestrial and aquatic vegetation. The technologies addressed in this report can be categorized as follows: self-attenuation (natural restoration); in-situ treatment; removal of contamination; ex-situ treatment; and transportation and final disposal. The report provides also background information about and a general approach to remediation of radioactively contaminated sites as well as some guidance for the selection of a preferred remediation technology. Examples of remediation experience in Australia and Canada are given it annexes

  16. Technologies for remediation of radioactively contaminated sites

    Energy Technology Data Exchange (ETDEWEB)

    1999-06-01

    This report presents particulars on environmental restoration technologies (control and treatment) which can be applied to land based, radioactively contaminated sites. The media considered include soils, groundwater, surface water, sediments, air, and terrestrial and aquatic vegetation. The technologies addressed in this report can be categorized as follows: self-attenuation (natural restoration); in-situ treatment; removal of contamination; ex-situ treatment; and transportation and final disposal. The report provides also background information about and a general approach to remediation of radioactively contaminated sites as well as some guidance for the selection of a preferred remediation technology. Examples of remediation experience in Australia and Canada are given it annexes Refs, figs, tabs

  17. Nanotechnology for Site Remediation: Fact Sheet

    Science.gov (United States)

    This fact sheet presents a snapshot of nanotechnology and its current uses in remediation. It presents information to help site project managers understand the potential applications of this group of technologies at their sites.

  18. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    International Nuclear Information System (INIS)

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado

  19. Optimization Review: Bunker Hill Mining and Metallurgical Complex Superfund Site, Central Treatment Plant (CTP), Kellogg, Shoshone County, Idaho

    Science.gov (United States)

    The Bunker Hill Mining and Metallurgical Complex Superfund Site includes all areas of the Coeur d’Alene Basin where mining-related contamination occurred and encompasses a 21-square mile “Box” along Interstate 90 surrounding the former smelter complex.

  20. Risk evaluation of remedial alternatives for the Hanford Site

    International Nuclear Information System (INIS)

    Clark, S.W.; Lane, N.K.; Swenson, L.

    1994-01-01

    Risk assessment is one of the many tools used to evaluate and select remedial alternatives and evaluate the risk associated with selected remedial alternatives during and after implementation. The risk evaluation of remedial alternatives (RERA) is performed to ensure selected alternatives are protective of human health and the environment. Final remedy selection is promulgated in a record of decision (ROD) and risks of the selected alternatives are documented. Included in the ROD documentation are the risk-related analyses for long-term effectiveness, short-term effectiveness, and overall protection of human health and the environment including how a remedy will eliminate, reduce or control risks and whether exposure will be reduced to acceptable levels. A major goal of RERA in the process leading to a ROD is to provide decision-makers with specific risk information that may be needed to choose among alternatives. For the Hanford Site, there are many considerations that must be addressed from a risk perspective. These include the large size of the Hanford Site, the presence of both chemical and radionuclide contamination, one likelihood of many analogues sites, public and worker health and safety, and stakeholder concern with ecological impacts from site contamination and remedial actions. A RERA methodology has been promulgated to (1) identify the points in the process leading to a ROD where risk assessment input is either required or desirable and (2) provide guidance on how to evaluate risks associated with remedial alternatives under consideration. The methodology and evaluations parallel EPA guidance requiring consideration of short-term impacts and the overall protectiveness of remedial actions for evaluating potential human health and ecological risks during selection of remedial alternatives, implementation of remedial measures, and following completion of remedial action

  1. Salmon Site Remedial Investigation Report, Appendix C

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  2. Salmon Site Remedial Investigation Report, Exhibit 2

    Energy Technology Data Exchange (ETDEWEB)

    USDOE NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  3. Salmon Site Remedial Investigation Report, Appendix D

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  4. Salmon Site Remediation Investigation Report, Appendix A

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  5. Salmon Site Remedial Investigation Report, Main Body

    Energy Technology Data Exchange (ETDEWEB)

    US DOE/NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  6. Salmon Site Remedial Investigation Report, Exhibit 2

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  7. Salmon Site Remedial Investigation Report, Appendix C

    Energy Technology Data Exchange (ETDEWEB)

    US DOE/NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  8. Salmon Site Remedial Investigation Report, Exhibit 5

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  9. Salmon Site Remedial Investigation Report, Exhibit 5

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  10. Superfund record of decision (EPA Region 4): Marzone Inc. /Chevron Chemical Company Superfund Site, Operable Unit 1, Tifton, GA, September 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-30

    This decision document (Record of Decision) presents the selected remedial action for the Marzone, Inc./Chevron Chemical Company Site in Tift County, Georgia. EPA has organized the work at this Site into two phases or operable units (OUs). Operable Unit No. 1 involves contamination on the 1.68-acre former Marzone pesticide blending area, part of the Slack Property, and railroad drainage ditch past the southwest corner of the horse pasture, and contaminated groundwater related to the Site. This first operable unit is broken down into two separate remedies; one for groundwater and the other for soil.

  11. Applications of Ecological Engineering Remedies for Uranium Processing Sites, USA

    Energy Technology Data Exchange (ETDEWEB)

    Waugh, William [Navarro Research and Engineering

    2016-05-23

    The U.S. Department of Energy (USDOE) is responsible for remediation of environmental contamination and long-term stewardship of sites associated with the legacy of nuclear weapons production during the Cold War in the United States. Protection of human health and the environment will be required for hundreds or even thousands of years at many legacy sites. USDOE continually evaluates and applies advances in science and technology to improve the effectiveness and sustainability of surface and groundwater remedies (USDOE 2011). This paper is a synopsis of ecological engineering applications that USDOE is evaluating to assess the effectiveness of remedies at former uranium processing sites in the southwestern United States. Ecological engineering remedies are predicated on the concept that natural ecological processes at legacy sites, once understood, can be beneficially enhanced or manipulated. Advances in tools for characterizing key processes and for monitoring remedy performance are demonstrating potential. We present test cases for four ecological engineering remedies that may be candidates for international applications.

  12. The observational approach for site remediation at federal facilities

    International Nuclear Information System (INIS)

    Myers, R.S.; Gianti, S.J.

    1989-11-01

    The observational approach, developed by geotechnical engineers to cope with the uncertainty associated with subsurface construction such as tunnels and dams, can be applied to hazardous waste site remediation. During the last year, the observational approach has gained increasing attention as a means of addressing the uncertainties involved in site remediation. In order to evaluate the potential advantages and constraints of applying the observational approach to site restoration at federal facilities, a panel of scientists and engineers from Pacific Northwest Laboratory and CH2M Hill was convened. Their review evaluated potential technical and institutional advantages and constraints that may affect the use of the observational approach for site remediation. This paper summarizes the panel's comments and conclusions about the application of the observational approach to site remediation at federal facilities. Key issues identified by the panel include management of uncertainty, cost and schedule, regulations and guidance, public involvement, and implementation. 5 refs

  13. Arsenic Fate, Transport And Stability Study: Groundwater, Surface Water, Soil And Sediment Investigation At Fort Devens Superfund Site

    Science.gov (United States)

    A field investigation was conducted to examine the distribution of arsenic in groundwater, surface water, and sediments at the Fort Devens Superfund Site. The study area encompassed a portion of plow Shop Pond (Red Cove), which receives groundwater discharge from the aquifer und...

  14. Radon impact at a remediated uranium mine site in Japan

    International Nuclear Information System (INIS)

    Ishimori, Yuu

    2011-01-01

    This paper mainly illustrates the radon impact of the closed uranium mine site remediated in 2007. The site remediated is the waste rock site located on the steep slope of a hill about 1.5 km upstream from a residential area along a main ravine. Major remedial action was to cover these waste rock yards with weathering granite soil. The radon flux density after remediation was intended to be 0.1 Bqm -2 s -1 in consideration with the natural background level around Ningyo-toge because there is no value of radon flux density regulated in Japan. Our action decreased the radon concentration in the site to natural background level, approximately from 10 to 40 Bqm -3 , although relatively high concentration in excess of 100 Bqm -3 was observed before remediation. On the other hand, our action did not decrease the radon concentrations around the site in general. This fact proved that the limited source such as waste rocks affected the radon concentrations at neighboring area only. The similar tendencies were also observed in other environmental data such as radon progeny concentrations. In conclusion, these findings proved that our remedial action was successful against radon. This fact will lead to more reasonable action plans for other closed mine sites. (author)

  15. Lead remediation and changes in human lead exposure: some physiological and biokinetic dimensions.

    Science.gov (United States)

    Mushak, Paul

    2003-02-15

    This paper presents a qualitative and quantitative analysis of the various aspects of lead remediation effectiveness with particular reference to human health risk assessment. One of the key elements of lead remediation efforts at such sites as those under the Superfund program deals with populations at elevated exposure and toxicity risk in the proximity of, or at, the site of remediation, especially remediation workers, workers at other tasks on sites that were remediated down to some action level of lead concentration in soils, and groups at risk in nearby communities. A second element has to do with how one measures or models lead exposure changes with special reference to baseline and post-remediation conditions. Various biomarkers of lead exposure can be employed, but their use requires detailed knowledge of what results using each means. The most commonly used approach is measurement of blood lead (Pb-B). Recognized limitations in the use of Pb-B has led to the use of predictive Pb exposure models, which are less vulnerable to the many behavioral, physiological, and environmental parameters that can distort isolated or 'single shot' Pb-B testings. A third aspect covered in this paper presents various physiological factors that affect the methods by which one evaluates Pb remediation effectiveness. Finally, this article offers an integrated look at how lead remediation actions directed at one lead source or pathway affect the total lead exposure picture for human populations at elevated lead exposure and toxicity risk.

  16. Soil sorting, new approach to site remediation management

    International Nuclear Information System (INIS)

    Bramlitt, E.T.; Woods, J.A.; Dillon, M.J.

    1996-01-01

    Soil sorting is the technology which conveys soil beneath contaminant detectors and, based on contaminant signal, automatically toggles a gate at the conveyor end to send soil with contamination above a guideline to a separate location from soil which meets the guideline. The technology was perfected for remediation of sites having soils with radioactive contamination, but it is applicable to other contaminants when instrumental methods exist for rapid contaminant detection at levels of concern. This paper examines the three methods for quantifying contamination in soil in support of site remediation management. Examples are discussed where the primary contaminant is plutonium, a radioactive substance and source of nuclear energy which can be hazardous to health when in the environment without controls. Field survey instruments are very sensitive to plutonium and can detect it in soil at levels below a part per billion, and there are a variety of soils which have been contaminated by plutonium and thoroughly investigated. The lessons learned with plutonium are applicable to other types of contaminants and site remediations. The paper concludes that soil sorting can be the most cost effective approach to site remediation, and it leads to the best overall cleanup

  17. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  18. Development of subsurface characterization method for decommissioning site remediation

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sang Bum; Nam, Jong Soo; Choi, Yong Suk; Seo, Bum Kyoung; Moon, Jei Kwon; Choi, Jong Won [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    In situ measurement of peak to valley method based on the ratio of counting rate between the full energy peak and Compton region was applied to identify the depth distribution of 137Cs. The In situ measurement and sampling results were applied to evaluate a residual radioactivity before and after remediation in decommissioning KRR site. Spatial analysis based on the Geostatistics method provides a reliable estimating the volume of contaminated soil with a graphical analysis, which was applied to the site characterization in the decommissioning KRR site. The in situ measurement and spatial analysis results for characterization of subsurface contamination are presented. The objective of a remedial action is to reduce risks to human health to acceptable levels by removing the source of contamination. Site characterization of the subsurface contamination is an important factor for planning and implementation of site remediation. Radiological survey and evaluation technology are required to ensure the reliability of the results, and the process must be easily applied during field measurements. In situ gamma-ray spectrometry is a powerful method for site characterization that can be used to identify the depth distribution and quantify radionuclides directly at the measurement site. The in situ measurement and Geostatistics method was applied to the site characterization for remediation and final status survey in decommissioning KRR site.

  19. Human health and other risk drivers to prioritize site remediation

    Energy Technology Data Exchange (ETDEWEB)

    McHugh, T.; Connor, J. [Groundwater Services Inc, Houston, TX (United States)

    2003-07-01

    Remedial actions at soil and groundwater cleanup sites have traditionally been addressed on an individual, case-by-case basis, as needed to address regulatory requirements. However, effective management of large portfolios of remediation sites (such as hundreds or thousands of underground storage tank sites owned by a single company) requires coordination and prioritisation of individual site response actions to optimise the degree of risk reduction achieved with available resources. To meet these management objectives, two new risk-based management tools have been developed and implemented by the authors: i) a simple risk-based classification system, that can be employed to prioritise response actions, identify key risk drivers, and measure risk reduction progress over time for the full site portfolio; and ii) a lifecycle cost management system that can be employed to forecast remediation spending and optimise risk reduction benefits. For use in prioritising response actions at remediation sites, 'risk' is defined as the negative consequence of no action. (orig.)

  20. Contingency analysis modeling for superfund sites and other sources. Final report

    International Nuclear Information System (INIS)

    Christensen, D.; Kaiser, G.D.

    1993-01-01

    The report provides information on contingency modeling for a wide range of different accidental release scenarios of hazardous air pollutants that might take place at Superfund and other sites. The scenarios are used to illustrate how atmospheric dispersion models, including dense gas models, should be applied. Particular emphasis is made on the input data that is needed for proper applications of models. Flow charts direct the user to specific sections where various scenarios are discussed. A check list of items that should be discussed before running the model is provided. Several examples are provided to specifically show how to apply the models so as to produce a credible analysis for a particular release scenario

  1. Technologies to remediate hazardous waste sites

    International Nuclear Information System (INIS)

    Falco, J.W.

    1990-03-01

    Technologies to remediate hazardous wastes must be matched with the properties of the hazardous materials to be treated, the environment in which the wastes are imbedded, and the desired extent of remediation. Many promising technologies are being developed, including biological treatment, immobilization techniques, and in situ methods. Many of these new technologies are being applied to remediate sites. The management and disposal of hazardous wastes is changing because of federal and state legislation as well as public concern. Future waste management systems will emphasize the substitution of alternatives for the use of hazardous materials and process waste recycling. Onsite treatment will also become more frequently adopted. 5 refs., 7 figs

  2. Remediation of the Gunnar uranium mine site, northern Saskatchewan

    International Nuclear Information System (INIS)

    Calvert, H.T.; Brown, J.L.

    2011-01-01

    The Gunnar uranium mine, located in northern Saskatchewan, operated from 1955 to 1963. When the mine was closed, the site was not remediated to the standards that are in place for today's uranium mines. Waste rock and mill tailings were left un-covered and water quality issues were not addressed. As a result, the current state of the site impacts the local environment. The company that operated the Gunnar Mine no longer exists. In 2006, the Government of Saskatchewan and the Government of Canada entered into an agreement to share the costs for remediating the site. An environment assessment of the project to remediate the site is currently underway. This paper provides an update of the issues and the progress being made. (author)

  3. Superfund TIO videos: Set A. Settlement tools and practices, win-win negotiations, closeout, records management, authorities and liabilities. Part 5. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into 5 sections. Section 1 provides an overview of settlement activities including conducting an information exchange, issuing general notice letters, initiating special notice procedures, receiving good faith offers (GFO), negotiating and settlements, and pursuing enforcement actions. Section 2 covers the types of negotiations that commonly involve OSCs and RPMs. The characteristics of a negotiating style that satisfy all the parties as well as methods for preparing and conducting this type of negotiation are outlined. Section 3 deals with post-removal site control arrangements and other closeout requirements for a removal site, such as completing necessary paperwork. The remedial project closeout procedures also are covered, including the remedial closeout report, operation and maintenance (O ampersand M) arrangements, transfer of site responsibility, and deletion from the National Priorities List (NPL). Section 4 discusses the purpose, procedures, roles and responsibilities associated with records management under Superfund. Section 5 outlines the response authority provided by CERCLA to OCSs and RPMs

  4. Site characterization techniques used in environmental remediation activities

    International Nuclear Information System (INIS)

    Kostelnik, K.M.

    2000-01-01

    As a result of decades of nuclear energy research, weapons production, as well as ongoing operations, a significant amount of radioactive contamination has occurred throughout the United States Department of Energy (DOE) complex. DOE facility are in the process of assessing and potentially remediating various sites according to the regulations imposed by a Federal Facility Agreement and Consent order (FFA/CO) between DOE, the state in which the facility is located, and the U.S. Environmental Protection Agency (EPA). In support of these active site remediation efforts, the DOE has devoted considerable resources towards the development of innovative site characterization techniques that support environmental restoration activities. These resources and efforts have focused on various aspects of this complex problem. Research and technology development conducted at the Idaho National Engineering and Environmental Laboratory (INEEL) has resulted in the ability and state-of-the-art equipment required to obtain real-time, densely spaced, in situ characterization data (i.e. detection, speciation, and location) of various radionuclides and contaminants. The Remedial Action Monitoring System (RAMS), developed by the INEEL, consists of enhanced sensor technology, measurement modeling and interpretation techniques, and a suite of deployment platforms which can be interchanged to directly support remedial cleanup and site verification operations. In situ characterization techniques have advanced to the point where they are being actively deployed in support of remedial operations. The INEEL has deployed its system at various DOE and international sites. The deployment of in situ characterization systems during environmental restoration operations has shown that this approach results in several significant benefits versus conventional sampling techniques. A flexible characterization system permits rapid modification to satisfy physical site conditions, available site resources

  5. Graphic products used in the evaluation of traditional and emerging remote sensing technologies for the detection of fugitive contamination at selected superfund hazardous waste sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2011-01-01

    This report presents the overhead imagery and field sampling results used to prepare U.S. Geological Survey Open-File Report 2011-1050, 'Evaluation of Traditional and Emerging Remote Sensing Technologies for the Detection of Fugitive Contamination at Selected Superfund Hazardous Waste Sites'. These graphic products were used in the evaluation of remote sensing technology in postclosure monitoring of hazardous waste sites and represent an ongoing research effort. Soil sampling results presented here were accomplished with field portable x-ray fluoresence (XRF) technology and are used as screening tools only representing the current conditions of metals and other contaminants at selected Superfund hazardous waste sites.

  6. Challenges for Deep Vadose Zone Remediation at the Hanford Site

    International Nuclear Information System (INIS)

    Morse, John G.; Charboneau, Briant L.; Lober, Robert W.; Triplett, Mark B.

    2008-01-01

    The 'deep vadose zone' is defined as the region below the practical depth of surface remedy influence (e.g., excavation or barrier). At the Hanford Site, this region of the Central Plateau poses unique challenges for characterization and remediation. The contaminants in this region also pose a potentially significant continuing or future threat to groundwater. Currently, deep vadose zone characterization efforts and remedy selection are spread over multiple waste site Operable Units and tank farm Waste Management Areas. A particular challenge for this effort is the situation in which past leaks from single-shell tanks have become commingled with discharges from nearby liquid disposal sites. The Hanford Site is working with all affected parties, including the Washington State Department of Ecology, the Environmental Protection Agency, DOE-RL, DOE-ORP, and multiple contractor organizations to develop a unified approach to conducting work and reaching remediation decisions. This effort addresses the complex and challenging technical and regulatory issues within this environment. A true inter-Agency effort is evaluating the best strategy or combination of strategies for focusing technical investigations, including treatability studies, and for attaining remedy decisions on the Hanford Site

  7. New York's new Superfund regulations: Implications for federal and other state programs

    International Nuclear Information System (INIS)

    Pavetto, C.S.; Rubinton, D.S.

    1994-01-01

    The need for cleaning up hazardous waste disposal sites was identified early in New York. In fact, New York's ''Superfund'' statute preceded the federal Superfund law thereby providing a model for CERCLA. Moreover, there are currently almost as many sites on New York's Registry of Inactive Hazardous Waste Disposal sites as there are sites on the National Priorities List. While New York's law served as a model for the federal CERCLA, CERCLA, in turn, has served as a model for other states' statutes. Similarly, lessons learned from the implementation of state Superfund statutes such as New York's can be instructive for those whose work involves dealing with CERCLA-type issues. This is because the problems associated with site restoration and cleanup, such as exceedingly complex site review and evaluation processes, high transaction costs, and difficulties in prioritizing sites for clean-up based upon the threat or risk of environmental harm, are universal

  8. Passive remediation strategies for petroleum contaminated sites

    International Nuclear Information System (INIS)

    Everett, L.G.; Cullen, S.J.; Eccles, L.A.

    1991-01-01

    The US EPA is becoming increasingly aware of costs and the limited success of existing remediation strategies. Research teams within the US EPA believe that if passive remediation can be successfully demonstrated, it is a candidate for best available technology. Passive remediation, however, must be demonstrated through the use of monitoring techniques, which demonstrate: contaminants are not moving in the dissolved, adsorbed or free product phase; and contamination is biodegrading in-place. This paper presents a concise monitoring and analysis strategy for passive remediation. Specifically, the paper presents the accuracy, precision and operating range of neutron moderation techniques as a low cost, real-time screening tool to measure the migration of the dissolved phase in soil moisture, the stabilized adsorbed phase and free product movement. In addition, the paper identifies the capillary pressure range through which the dissolved phase will move and identifies techniques for satisfying the risk analysis that movement is not taking place. The rationale for passive remediation taking place is confirmed through a discussion of gas ratios associated with bacterial assimilation of hydrocarbons. Gas ratios which are relatively constant above ground are highly inverted in the subsurface at contamination sites. The use of frequent screening of a vertical geologic profile using least cost techniques and the infrequent analysis of soil gas ratios provides the required data upon which the public will accept passive remediation as best available technology at a particular site. The paper points out that neutron moderation is a high candidate vadose zone monitoring device and identifies alternative techniques using resistivity and dielectric constants, which are in the developmental stage. The economic implications for passive remediation are enormous relative to the excavation and remediation strategies which are currently in use

  9. Remediation of Soil at Nuclear Sites

    International Nuclear Information System (INIS)

    Holmes, R.; Boardman, C.; Robbins, R; Fox, Robert Vincent; Mincher, Bruce Jay

    2000-01-01

    As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste

  10. CERCLA-linked environmental impact and benefit analysis: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    McNally, Amanda D; Fitzpatrick, Anne G; Mirchandani, Sera; Salmon, Matthew; Edwards, Deborah A

    2018-01-01

    This analysis focused on evaluating the environmental consequences of remediation, providing indicators for the environmental quality pillar of 3 "pillars" of the Portland Harbor Sustainability Project (PHSP) framework (the other 2 pillars are economic viability and social equity). The project an environmental impact and benefit analysis (EIBA) and an EIBA-based cost-benefit analysis. Metrics developed in the EIBA were used to quantify and compare remedial alternatives' environmental benefits and impacts in the human and ecological domains, as a result of remedial actions (relative to no action). The cost-benefit results were used to evaluate whether remediation costs were proportionate or disproportionate to the environmental benefits. Alternatives B and D had the highest overall benefit scores, and Alternative F was disproportionately costly relative to its achieved benefits when compared to the other remedial alternatives. Indeed, the costlier alternatives with larger remedial footprints had lower overall EIBA benefit scores-because of substantially more air emissions, noise, and light impacts, and more disturbance to business, recreational access, and habitat during construction-compared to the less costly and smaller alternatives. Put another way, the adverse effects during construction tended to outweigh the long-term benefits, and the net environmental impacts of the larger remedial alternatives far outweighed their small incremental improvements in risk reduction. Results of this Comprehensive Environmental Response Compensation and Liability Act (CERCLA)-linked environmental analysis were integrated with indicators of economic and social impacts of remediation in a stakeholder values-based sustainability framework. These tools (EIBA, EIBA-based cost-benefit analysis, economic impact assessment, and the stakeholder values-based integration) provide transparent and quantitative evaluations of the benefits and impacts associated with remedial alternatives

  11. Description of the Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed

  12. Description of the Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

  13. Preliminary remediation goals for ecological endpoints

    International Nuclear Information System (INIS)

    Efroymson, R.A.; Suter, G.W. II; Sample, B.E.; Jones, D.S.

    1996-07-01

    Preliminary remediation goals (PRGs) are useful for risk assessment and decision making at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites. PRGs are upper concentration limits for specific chemicals in specific environmental media that are anticipated to protect human health or the environment. They can be used for multiple remedial investigations at multiple facilities. In addition to media and chemicals of potential concern, the development of PRGs generally requires some knowledge or anticipation of future land use. In Preliminary Remediation Goals for Use at the U.S. Department of Energy Oak Ridge Operations Office (Energy Systems 1995), PRGs intended to protect human health were developed with guidance from Risk Assessment Guidance for Superfund: Volume I - Human Health Evaluation Manual, Part B (RAGS) (EPA 1991). However, no guidance was given for PRGs based on ecological risk. The numbers that appear in this volume have, for the most part, been extracted from toxicological benchmarks documents for Oak Ridge National Laboratory (ORNL) and have previously been developed by ORNL. The sources of the quantities, and many of the uncertainties associated with their derivation, are described in this technical memorandum

  14. Preliminary remediation goals for ecological endpoints

    International Nuclear Information System (INIS)

    Efroymson, R.A.; Suter, G.W. II.

    1995-09-01

    Preliminary remediation goals (PRGs) are useful for risk assessment and decision making at Comprehensive Environmental Response, compensation, and Liability Act (CERCLA) sites. PRGs are upper concentration limits for specific chemicals in specific environmental media that are anticipated to protect human health or the environment. They can be used for multiple remedial investigations at multiple facilities. In addition to media and chemicals of potential concern, the development of PRGs generally requires some knowledge or anticipation of future land use. In Preliminary Remediation Goals for Use at the US Department of Energy Oak Ridge Operations Office (Energy Systems 1995), PRGs intended to protect human health were developed with guidance from Risk Assessment Guidance for Superfund: Volume I-Human Health Evaluation Manual, Part B (RAGS) (EPA 1991). However, no guidance was given for PRGs based on ecological risk. The numbers that appear in this volume have, for the most part, been extracted from toxicological benchmarks documents for Oak Ridge National Laboratory (ORNL) and have previously been developed by ORNL. The sources of the quantities, and many of the uncertainties associated with their derivation, are described in this technical memorandum

  15. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  16. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    International Nuclear Information System (INIS)

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho

  17. Remedial Investigation of Hanford Site Releases to the Columbia River

    International Nuclear Information System (INIS)

    Lerch, J.A.

    2009-01-01

    In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts of Hanford Site hazardous substance releases to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previously investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The impacts are now being assessed under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 via a remedial investigation. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River has been developed and issued to initiate the remedial investigation. The work plan establishes a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities began in October 2008 and are anticipated to continue into Fall 2009 over a 120 mile stretch of the Columbia River. Information gained from performing this remedial investigation will ultimately be used to help make final regulatory decisions for cleaning up Hanford Site contamination that exists in and along the Columbia River. (authors)

  18. Petroleum hydrocarbon contaminated sites: a review of investigation and remediation regulations and processes

    Energy Technology Data Exchange (ETDEWEB)

    Epelbaum, Michel; Claudio, Jair R [Bureau Veritas do Brasil Sociedade Classificadora e Certificadora Ltda., Sao Paulo, SP (Brazil)

    1994-12-31

    This paper discusses alternatives on remediation of petroleum hydrocarbon contaminated sites which include groundwater remediation techniques and soil remediation techniques. Finally, the work points out some trends of sites remediation in Brazil and abroad. 6 refs., 1 fig., 7 tabs.

  19. Petroleum hydrocarbon contaminated sites: a review of investigation and remediation regulations and processes

    Energy Technology Data Exchange (ETDEWEB)

    Epelbaum, Michel; Claudio, Jair R. [Bureau Veritas do Brasil Sociedade Classificadora e Certificadora Ltda., Sao Paulo, SP (Brazil)

    1993-12-31

    This paper discusses alternatives on remediation of petroleum hydrocarbon contaminated sites which include groundwater remediation techniques and soil remediation techniques. Finally, the work points out some trends of sites remediation in Brazil and abroad. 6 refs., 1 fig., 7 tabs.

  20. Remedial investigation for the chemical plant area of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1992-11-01

    The US Department of Energy (DOE) is responsible for management of the Weldon Spring Site Remedial Action Project (WSSRAP) under its Environmental Restoration and Waste Management Program. Major goals include eliminating potential public and environmental hazards due to site contamination and releasing the property for alternate uses to the maximum extent practicable. The purpose of the remedial investigation described in this report was to determine the extent of contamination associated with the portion of the Weldon Spring site known as the chemical plant and raffinate pit area. The DOE has assumed responsibility for investigating and remediating all on-site soil contamination and off-site soil which is radiologically contaminated as a result of uranium and thorium processing operations. The DOE has also assumed the responsibility for radiologically contaminated groundwater on and off site. The Weldon Spring site remedial investigation also involved the evaluation of the sources, nature and extent, and environmental fate and transport of contaminants to provide a basis for defining the risks that the contaminants may pose to human health and the environment. Data are included in this report to support the screening of remedial technologies and to permit the development and detailed analysis of alternatives for remedial action at the site during the feasibility study process

  1. Pyramid mountain diesel fuel storage site remediation

    Energy Technology Data Exchange (ETDEWEB)

    Brolmsa, M.; Sandau, C. [Jacques Whitford Environment Ltd., Burnaby, BC (Canada)

    2005-07-01

    Remediation activities during the decommissioning of a microwave tower facility where a tram line was used to transfer diesel fuel from the base of a mountain to its summit were described. As the site was leased from Parks Canada, federal guidelines were used to assess levels of contamination. Underground storage tanks (USTs) used for diesel storage had been replaced with aboveground storage tanks (AST) in 1994. Remediation was also complicated by the remote location and altitude of the site, as well as by extreme weather conditions. Hand auguring and test pitting were used at both the summit and base to allow characterization and preliminary delineation of impacted soils. A heavy lift helicopter was used to place demolition and excavation equipment on the summit. An excavator was used to remove hydrocarbon impacted soils. Following the remedial excavation for the summit diesel AST, residual soil impacts in excess of the applicable remediation guidelines were present at the bottom of the tank nest and under a floor slab. An environmental liner was installed, and a quantitative screening level risk assessment demonstrated the low level of risk for the area, as well as for waste oil impacted soils on the slope below the summit. Contaminants of potential concern were barium, zinc, naphthalene, and petroleum hydrocarbon fractions F1-F4. It was concluded that there are now no unacceptable ecological or human risks from residual impacts at the site. 1 tab., 19 figs.

  2. Methods for the analysis and remediation of contaminated sites

    International Nuclear Information System (INIS)

    Mariani, M.; Bemporad, E.; Berardi, S.; Marino, A.; Paglietti, F.

    2008-01-01

    In Italy, in recent years, the number of contaminated sites has multiplied disproportionately. In essence, contamination is caused by accidental spills or intentional discharge of pollutants into the soils or waters from industrial activities, or non-controlled deposits of urban and/or industrial waste, mostly part toxic and harmful. Contaminated sites clearly pose risks to human health and the environment; hence the need to remediate these sites. The remediation of soil and water and the restoration of degraded areas are complex operations requiring specific technical and scientific know-how, including knowledge of the methodologies and tools required to tackle problems arising during the different phases of the remediation process. These include, in particular: - health and environmental risk assessment procedures for the quantification of risks to human health (general population and workers) and the environment from a contaminated site; - remote sensing and the Geographical Information Systems (GIS), which are a fundamentally important IT support for each phase of planning and management of remediation interventions; - criteria for the management of sites contaminated by asbestos, a highly carcinogenic and therefore hazardous substance that was widely used in the past due to its particular mechanical and thermal characteristics; - analysis of the issues relating to waste management in contaminated sites; - relationship between safety procedures for workers and the general population. Identification of the best available techniques for an efficient, integrated management of contaminated sites, which will also take into account the health protection of workers and of the general population living near such sites

  3. Site remediation guided by risk assessment

    International Nuclear Information System (INIS)

    McBean, E.A.; Gowing, A.; Pieczonka, G.

    2002-01-01

    'Full text:' Risk assessment (RA) provides an effective tool for identifying hazards with respect to human health and ecological receptors, hazards that arise from contaminants in the environment. Risk assessment relies upon: hazard identification/problem formulation; toxicity assessment; exposure assessment; and risk characterization. Hence, risk assessment provides an effective guide for site remediation through the identification of the associated risks arising from pre- and potential post-remediation activities. As a demonstration of this decision-making process, a site-specific risk assessment (SSRA) was performed on a chemical producing facility. Historical waste practices during the production of DDT compounds resulted in impacted site soils and sediment and soils of the creek passing through the facility. The purpose of the SSRA was to derive site-specific cleanup values for the impacted on-site soils, creek sediments, and embankment soils, incorporating human and ecological receptors associated with the environmental media. The human exposure pathways considered were dermal contact, incidental ingestion, and inhalation of the various soils. The potential human receptors were industrial workers, construction workers, trespassers, and off-site residents. Ingestion of fish from the creek by residents was also evaluated in the human health risk assessment (HHRA). Food web analyses were used to evaluate the impact of exposure to chemical compounds in aquatic sediments and related soils by ecological receptors such as the great blue heron, raccoon, and mink. The SSRA involved modelling the daily chemical intake by receptors and the transfer of chemicals to identified secondary media (e.g., ambient air or animal tissues) that are also potential exposure media. These models, while using the site-specific chemical data in the source media, possess uncertainties associated with default parameters that are only approximations and not site-specific (e.g., soil

  4. Tier 2 guidelines and remediation of Tebuthiuron on a native prairie site

    Energy Technology Data Exchange (ETDEWEB)

    Bessie, K.; Harckham, N.; Dance, T. [EBA Engineering Consultants Ltd., Calgary, AB (Canada); Burk, A. [EnCana Corp., Calgary, AB (Canada); Stephenson, G. [Stantec Consulting, Guelph, ON (Canada); Corbet, B. [Access Analytical Laboratories Inc., Calgary, AB (Canada)

    2009-10-01

    Tebuthiuron is a sterilant used to control vegetation at upstream and midstream petroleum sites. This article discussed the remediation processes used to reclaim a native prairie site contaminated with tebuthiuron. The site was located within a dry mixed grass natural area. A literature review was conducted to establish soil eco-contact guidelines specific to tebuthiuron. A site-specific ecotoxicity assessment was then conducted using a liquid chromatograph to detect tebuthiuron limits in the contaminated soils. A soil sampling technique was used to delineate the affected areas at the site. Site soils were spiked with various concentrations of tebuthiuron ranging from 0.00003 mg/kg to 3000 mg/kg. Test species included a Folsomia candida, an earthworm, and 4 plant species. The study showed that the invertebrate species were less sensitive to tebuthiuron than the plant species. A groundwater assessment showed that tebuthiuron levels exceeded Tier 1 groundwater remediation guidelines. A multilayer hydro-geological model showed that remediation guidelines were orders of magnitude greater than Tier 1 groundwater remediation. A thermal desorption technique was used to remediate the site. 7 refs., 8 figs.

  5. Post-Remediation Radiological Dose Assessment, Linde Site, Tonawanda, New York

    Energy Technology Data Exchange (ETDEWEB)

    Kamboj, Sunita [Argonne National Lab. (ANL), Argonne, IL (United States); Durham, Lisa A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-06-01

    A post-remediation radiological dose assessment was conducted for the Formerly Utilized Sites Remedial Action Program (FUSRAP) Linde Site by using the measured residual concentrations of the radionuclides of concern following the completion of the soils remedial action. The site’s FUSRAP-related contaminants of concern (COCs) are radionuclides associated with uranium processing activities conducted by the Manhattan Engineer District (MED) in support of the Nation’s early atomic energy and weapons program and include radium-226 (Ra-226), thorium-230 (Th-230), and total uranium (Utotal). Remedial actions to address Linde Site soils and structures were conducted in accordance with the Record of Decision for the Linde Site, Tonawanda, New York (ROD) (USACE 2000a). In the ROD, the U.S. Army Corps of Engineers (USACE) determined that the cleanup standards found in Title 40, Part 192 of the Code of Federal Regulations (40 CFR Part 192), the standards for cleanup of uranium mill sites designated under the Uranium Mill Tailings Radiation Control Act (UMTRCA), and the Nuclear Regulatory Commission (NRC) standards for decommissioning of licensed uranium and thorium mills, found in 10 CFR Part 40, Appendix A, Criterion 6(6), are Applicable or Relevant and Appropriate Requirements (ARARs) for cleanup of MED-related contamination at the Linde Site. The major elements of this remedy will involve excavation of the soils with COCs above soil cleanup levels and placement of clean materials to meet the other criteria of 40 CFR Part 192.

  6. Comparison of approaches for assessing sustainable remediation of contaminated sites

    DEFF Research Database (Denmark)

    Søndergaard, Gitte Lemming; Binning, Philip John; Bjerg, Poul Løgstrup

    2017-01-01

    It has been estimated that there are approximately 2.5 million potentially contaminated sites in Europe. Of these, approximately 340,000 sites are thought to be contaminated to a degree that may require remediation (Joint Research Center, 2014). Until recently, remediation was considered...... to be inherently green or sustainable since it removes a contaminant problem. However, it is now broadly recognized that while remediation is intended to address a local environmental threat, it may cause other local, regional and global impacts on the environment, society and economy. Over the last decade......, the broader assessment of these criteria is occurring in a movement toward ‘sustainable remediation’. This paper aims to review the available methods for assessing the sustainability of remediation alternatives. Sustainable remediation seeks to reduce direct contaminant point source impacts on the environment...

  7. Ethical Issues in Using Children's Blood Lead Levels as a Remedial Action Objective

    Science.gov (United States)

    Evans, Emily Lorraine

    2011-01-01

    The Environmental Protection Agency measures the success or failure of Superfund site remediation efforts against remedial action objectives (RAOs). RAOs are frequently based on environmental contaminant concentrations, but with lead exposure, blood lead levels from the population at risk are often used. Although childhood lead screening is an important public health tool, an RAO based on child blood lead levels raises ethical concerns: public health efforts that are more reactive than preventive, a blood lead standard (10 μg/dL) that may not be fully protective, the use of a measure whose validity and reliability may be easily compromised, and exacerbation of environmental injustice and systematic disadvantages. The example of Bunker Hill mine, Kellogg, Idaho, allowed an examination of these ethical concerns. PMID:21836120

  8. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which describes the proposed remedial action for the Naturita site. An extensive amount of data and supporting information has been generated and evaluated for this remedial action. These data and supporting information are not incorporated into this single document but are included or referenced in the supporting documents. The RAP consists of this RAS and four supporting documents or attachments. This Attachment 2, Geology Report describes the details of geologic, geomorphic, and seismic conditions at the Dry Flats disposal site

  9. Geochemical Characterization of Mine Waste, Mine Drainage, and Stream Sediments at the Pike Hill Copper Mine Superfund Site, Orange County, Vermont

    Science.gov (United States)

    Piatak, Nadine M.; Seal, Robert R.; Hammarstrom, Jane M.; Kiah, Richard G.; Deacon, Jeffrey R.; Adams, Monique; Anthony, Michael W.; Briggs, Paul H.; Jackson, John C.

    2006-01-01

    The Pike Hill Copper Mine Superfund Site in the Vermont copper belt consists of the abandoned Smith, Eureka, and Union mines, all of which exploited Besshi-type massive sulfide deposits. The site was listed on the U.S. Environmental Protection Agency (USEPA) National Priorities List in 2004 due to aquatic ecosystem impacts. This study was intended to be a precursor to a formal remedial investigation by the USEPA, and it focused on the characterization of mine waste, mine drainage, and stream sediments. A related study investigated the effects of the mine drainage on downstream surface waters. The potential for mine waste and drainage to have an adverse impact on aquatic ecosystems, on drinking- water supplies, and to human health was assessed on the basis of mineralogy, chemical concentrations, acid generation, and potential for metals to be leached from mine waste and soils. The results were compared to those from analyses of other Vermont copper belt Superfund sites, the Elizabeth Mine and Ely Copper Mine, to evaluate if the waste material at the Pike Hill Copper Mine was sufficiently similar to that of the other mine sites that USEPA can streamline the evaluation of remediation technologies. Mine-waste samples consisted of oxidized and unoxidized sulfidic ore and waste rock, and flotation-mill tailings. These samples contained as much as 16 weight percent sulfides that included chalcopyrite, pyrite, pyrrhotite, and sphalerite. During oxidation, sulfides weather and may release potentially toxic trace elements and may produce acid. In addition, soluble efflorescent sulfate salts were identified at the mines; during rain events, the dissolution of these salts contributes acid and metals to receiving waters. Mine waste contained concentrations of cadmium, copper, and iron that exceeded USEPA Preliminary Remediation Goals. The concentrations of selenium in mine waste were higher than the average composition of eastern United States soils. Most mine waste was

  10. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods

  11. PROBABILISTIC RISK ANALYSIS OF REMEDIATION EFFORTS IN NAPL SITES

    Science.gov (United States)

    Fernandez-Garcia, D.; de Vries, L.; Pool, M.; Sapriza, G.; Sanchez-Vila, X.; Bolster, D.; Tartakovsky, D. M.

    2009-12-01

    The release of non-aqueous phase liquids (NAPLs) such as petroleum hydrocarbons and chlorinated solvents in the subsurface is a severe source of groundwater and vapor contamination. Because these liquids are essentially immiscible due to low solubility, these contaminants get slowly dissolved in groundwater and/or volatilized in the vadoze zone threatening the environment and public health over a long period. Many remediation technologies and strategies have been developed in the last decades for restoring the water quality properties of these contaminated sites. The failure of an on-site treatment technology application is often due to the unnoticed presence of dissolved NAPL entrapped in low permeability areas (heterogeneity) and/or the remaining of substantial amounts of pure phase after remediation efforts. Full understanding of the impact of remediation efforts is complicated due to the role of many interlink physical and biochemical processes taking place through several potential pathways of exposure to multiple receptors in a highly unknown heterogeneous environment. Due to these difficulties, the design of remediation strategies and definition of remediation endpoints have been traditionally determined without quantifying the risk associated with the failure of such efforts. We conduct a probabilistic risk assessment of the likelihood of success of an on-site NAPL treatment technology that easily integrates all aspects of the problem (causes, pathways, and receptors). Thus, the methodology allows combining the probability of failure of a remediation effort due to multiple causes, each one associated to several pathways and receptors.

  12. Risk evaluation of remedial alternatives for the Hanford Site

    International Nuclear Information System (INIS)

    1994-09-01

    This document provides guidance on the process of risk evaluation of remedial alternatives (RERA) at the Hanford Site. Remediation activities at the Hanford Site are being conducted pursuant to the Comprehensive Environmental Restoration, Compensation, and Liability Act and the Resource Conservation and Recovery Act. This document identifies points in the remedial alternative selection process where risk assessment input is either required or desirable. For each of these points of application, the document identifies issues to consider and address, and suggests possible approaches, techniques, and appropriate levels of detail. The level of detail of a RERA is driven by the need to use risk as a criterion for selecting a remedial alternative. Such a document is needed to ensure that RERA is conducted in a consistent manner, and to prevent restating or creating guidance within each RERA

  13. The atmosphere as a source/sink of polychlorinated biphenyls to/from the Lower Duwamish Waterway Superfund site

    International Nuclear Information System (INIS)

    Apell, Jennifer N.; Gschwend, Philip M.

    2017-01-01

    Waterbodies polluted with polychlorinated biphenyls (PCBs) may cause the air in the surrounding area to become PCB-contaminated. Conversely, when a waterbody is located in or near an urban area, the deposition of atmospheric PCBs may act as a low-level, ongoing source of PCB contamination to that water. Distinguishing these situations is necessary to be protective of human populations and to guide efforts seeking to cleanup such aquatic ecosystems. To assess the situation at the Lower Duwamish Waterway (LDW) Superfund site, low-density polyethylene passive samplers were deployed in the summer of 2015 to quantify freely dissolved water and gaseous air concentrations of PCBs thereby enabling estimates of the direction and magnitude of air-water exchange of PCB congeners. For the sum of the 27 PCB congeners, average concentrations were 220 pg/m 3 (95% C.I.: 80–610) in the air and 320 pg/L (95% C.I.: 110–960) in the water. The sum of air-water exchange fluxes of these PCB congeners was estimated to be 68 ng/m 2 /day (95% C.I.: 30–148) into the lower atmosphere, contrasting with the reported wet and dry depositional flux of only 5.5 ng/m 2 /day (95% C.I.: 1–38) from the air into the water. Therefore, the atmosphere was ultimately a sink of PCBs from the LDW Superfund site, at least under 2015 summertime conditions. However, we conclude that air-water exchange of PCBs is likely only a minor sink of PCBs from the LDW and only a minor source of contamination to the region's local atmosphere. - Highlights: • Passive samplers were used to estimate air and water concentrations. • At this site, PCBs were being transported from the water into the local atmosphere. • Air-water exchange was likely only a minor sink of PCBs for the LDW site. • The LDW was likely only a minor source of PCBs to the local atmosphere. - Air-water exchange of PCBs from the LDW Superfund site, calculated using passive sampler data, was determined to be a minor sink of PCBs from

  14. Critical review of decision support tools for sustainability assessment of site remediation options.

    Science.gov (United States)

    Huysegoms, Lies; Cappuyns, Valérie

    2017-07-01

    In Europe alone, there are more than 2,5 million potentially contaminated sites of which 14% are expected to require remediation. Contaminated soil and groundwater can cause damage to human health as well as to valuable ecosystems. Globally more attention has been paid to this problem of soil contamination in the past decades. For example, more than 58 000 sites have been remediated in Europe between 2006 and 2011. Together with this increase in remediation projects there has been a surge in the development of new remediation technologies and decision support tools to be able to match every site and its specific characteristics to the best possible remediation alternative. In the past years the development of decision support tools (DST) has evolved in a more sustainable direction. Several DSTs added the claim not only to denote effective or technologically and economically feasible remediation alternatives but also to point out the more or most sustainable remediation alternatives. These trends in the evaluation of site remediation options left users with a confusing clew of possibly applicable tools to assist them in decision making for contaminated site remediation. This review provides a structured overview on the extent decision support tools for contaminated site remediation, that claim to assist in choosing the most sustainable remediation alternative, actually include the different elements of sustainability proposed in our assessment framework. The review contains an in-depth analysis of thirteen tools specifically developed to assess the sustainability of site remediation alternatives. This analysis is based on six criteria derived from the definition of sustainable development of the Brundtland report. The six criteria were concretized by using the three pillars of sustainability, applied to site remediation according to the SuRF-UK framework, two criteria derived from Life Cycle Assessment and Cost-Benefit Analysis, and an 'User friendly' criterion

  15. Final Report; Arsenic Fate, Transport and Stability Study; Groundwater, Surface Water, Soil And Sediment Investigation, Fort Devens Superfund Site, Devens, Massachusetts

    Science.gov (United States)

    This document presents results from the Fiscal Years 2006-2008 field investigation at the Fort Devens Superfund Site, Operable Unit 1 (Shepley's Hill Landfill) to fulfill the research objectives outlined in the proposal entitled, 'Fate and Transport of Arsenic in an Urban, Milita...

  16. Full scale solvent extraction remedial results

    International Nuclear Information System (INIS)

    Cash, A.B.

    1992-01-01

    Sevenson Extraction Technology, Inc. has completed the development of the Soil Restoration Unit (initially developed by Terra-Kleen Corporation), a mobile, totally enclosed solvent extraction treatment facility for the removal of organic contaminated media is greater by a closed loop, counter current process that recycles all solvents. The solvents used are selected for the individual site dependant upon the contaminants, such as PCB's, oil, etc. and the soil conditions. A mixture of up to fourteen non-toxic solvents can be used for complicated sites. The full scale unit has been used to treat one superfund site, the Traband Site in Tulsa, Oklahoma, and is currently treating another superfund site, the Pinette's Salvage Yard Site in Washburn, Maine. The full scale Soil Restoration Unit has also been used at a non-superfund site, as part of a TSCA Research and Development permit. The results from these sites will be discussed in brief herein, and in more detail in the full paper

  17. Savannah River Site RCRA/CERCLA/NEPA integrated investigation case study

    International Nuclear Information System (INIS)

    Clark, D.R.; Thomas, R.; Wilson, M.P.

    1992-01-01

    The Savannah River Site (SRS) is a US Department of Energy facility placed on the Superfund National Priority List in 1989. Numerous past disposal facilities and contaminated areas are undergoing the integrated regulatory remediation process detailed in the draft SRS Federal Facility Agreement. This paper will discuss the integration of these requirements by highlighting the investigation of the D-Area Burning/Rubble Pits, a typical waste unit at SRS

  18. Horizontal directional drilling: a green and sustainable technology for site remediation.

    Science.gov (United States)

    Lubrecht, Michael D

    2012-03-06

    Sustainability has become an important factor in the selection of remedies to clean up contaminated sites. Horizontal directional drilling (HDD) is a relatively new drilling technology that has been successfully adapted to site remediation. In addition to the benefits that HDD provides for the logistics of site cleanup, it also delivers sustainability advantages, compared to alternative construction methods.

  19. Salmon Site Remedial Investigation Report, Appendix B (Part 2)

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  20. Salmon Site Remedial Investigation Report, Appendix B (Part 1)

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  1. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    International Nuclear Information System (INIS)

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  2. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

  3. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    International Nuclear Information System (INIS)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description

  4. Proposed plan for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-03-01

    The US Department of Energy (DOE) in compliance with Section 117(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, is releasing the proposed plan for remedial action at the United Nuclear Corporation (UNC) Disposal Site located at the DOE Oak Ridge Operations (ORO) Y-12 Plant, Oak Ridge, Tennessee. The purpose of this document is to present and solicit for comment to the public and all interested parties the ''preferred plan'' to remediate the UNC Disposal Site. However, comments on all alternatives are invited

  5. Nuclear Facilities Decommissioning and site remedial actions: a selected bibliography. Vol. 2

    International Nuclear Information System (INIS)

    Owen, P.T.; Fielden, J.M.; Knox, N.P.; Trotter, ES.

    1981-10-01

    This bibliography of 643 references represents the second in a series on nuclear facility decommissioning and site remedial actions to be produced by the Radiation Effects Information Center (REIC) within the Information Center Complex, Information Division, Oak Ridge National Laboratory. The bibliography contains scientific, technical, economic, and regulatory information pertaining to the US Department of Energy's Remedial Action Program. Major chapters are: Surplus Facilities Management Program; Nuclear Facilities Decommissioning; Formerly Utilized Sites Remedial Action Program; and Uranium Mill Tailings Management. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by title. Indexes are provided for: (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. The bibliography was compiled from a specialized data base established and maintained by REIC to provide information support for the US Department of Energy's Remedial Action Program, under the cosponsorship of its four major components: Surplus Facilities Management Program; Formerly Utilized Sites Remedial Action Program; Uranium Mill Tailings Remedial Action Program; and the Grand Junction Remedial Action Program

  6. Groundwater remediation at the Hanford site

    International Nuclear Information System (INIS)

    Fries, W.

    1993-01-01

    Ion exchange resin and adsorption technology has been used successfully to treat diversified types of toxic waste water for many years. Even though the Hanford Site presents many unique problems, the author believes these technologies can remediate the groundwater at this site. However, treatment of the sludge in tanks generally is beyond the pale of these technologies except for the possibility of experimental studies being performed at the University of Idaho (Troescher)

  7. Superfund record of decision (EPA Region 3): Southern Maryland Wood Treating Site, Hollywood, MD, September 8, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The decision document presents the selected remedial action for the Southern Maryland Wood Treating Site (`the Site`), in Hollywood, Maryland. This is the second and final phase of remedial action for the Site. This phase addresses soil and sediment contamination and non-aqueous phase liquids (`NAPLs`) which are the principal threats remaining at the Site and are a source of contamination to the ground water and surface water.

  8. Vadose zone investigations at the Lawrence Livermore National Laboratory Superfund Site: An overview

    International Nuclear Information System (INIS)

    Iovenitti, J.L.; Nitao, J.J.; Bishop, D.J.

    1992-09-01

    Lawrence Livermore National Laboratory (LLNL)is investigating the fate and transport of vadose zone contaminants at their Livermore site in Livermore, California. The principal objectives of this work are to identify potential source areas at the Livermore site which require remediation, to prioritize those areas, and finally, to optimize the remediation process. Primary contaminants of interest for this investigation are volatile organic compounds (VOCs) and tritium. A fully integrated, three-part program, consisting of quantitative modeling, field studies, and laboratory measurements, is in progress. To evaluate and predict vadose zone contaminant migration, quantitative modeling is used. Our modeling capabilities are being enhanced through the development of a multicomponent,three-dimensional,nonaqueous phase liquid-liquid-vapor,nonisothermal flow and transport computer code. This code will be also used to evaluate vadose zone remediation requirements. Field studies to acquire LLNL site-specific soil (sediment) characteristics for computer code calibration and validation include subsurf ace lithologic and contaminant profiling, in situ soil moisture content, ground surface emission flux of VOCs and tritium, transpiration of tritium, and ground surface evapotranspiration of water. Multilevel vadose zone monitoring devices are used to monitor the gaseous and aqueous transport of contaminants

  9. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  10. Surface water management at a mixed waste remediation site

    International Nuclear Information System (INIS)

    Schlotzhauer, D.S.; Warbritton, K.R.

    1991-01-01

    The Weldon Spring Remedial Action Project (WSSRAP) deals with chemical and radiological contaminants. MK-Ferguson Company is managing the project under contract with the US Department of Energy. Remedial activities include demolishing buildings, constructing material storage and staging areas, excavating and consolidating waste materials, and treating and disposing of the materials in a land disposal facility. Due to the excavation and construction required during remediation, a well-planned surface water management system is essential. Planning involves characterization of source areas and surface water transport mechanisms and identification of applicable regulations. System components include: erosion control sediment control, flow attenuation, and management of contaminated water. Combinations of these components may be utilized during actual construction and remediation to obtain optimum control. Monitoring is performed during implementation in order to assess the effectiveness of control measures. This management scheme provides for comprehensive management of surface water at this site by providing control and/or treatment to appropriate standards. Although some treatment methodologies for contaminated water are specific to site contaminants, this comprehensive program provides a management approach which is applicable to many remedial projects in order to minimize contaminant release and meet Clean Water Act requirements

  11. Innovative technology for expedited site remediation of extensive surface and subsurface contamination

    International Nuclear Information System (INIS)

    Audibert, J.M.E.; Lew, L.R.

    1994-01-01

    Large scale surface and subsurface contamination resulted from numerous releases of feed stock, process streams, waste streams, and final product at a major chemical plant. Soil and groundwater was contaminated by numerous compounds including lead, tetraethyl lead, ethylene dibromide, ethylene dichloride, and toluene. The state administrative order dictated that the site be investigated fully, that remedial alternative be evaluated, and that the site be remediated within a year period. Because of the acute toxicity and extreme volatility of tetraethyl lead and other organic compounds present at the site and the short time frame ordered by the regulators, innovative approaches were needed to carry out the remediation while protecting plant workers, remediation workers, and the public

  12. Development of site remediation technologies in European countries

    International Nuclear Information System (INIS)

    Nunno, T.J.; Hyman, J.A.; Pheiffer, T.

    1988-01-01

    Site remediation is a pressing issue in European countries due to limited availability of land. Therefore, much progress is being made in the development of effective technologies for remediating contaminated sites. The purpose of this program was to investigate the most successful and innovative technologies for potential application into US markets. This EPA-sponsored project was based on a 9-month research effort which identified 95 innovative technologies in use or being researched in foreign countries. The most promising technologies were studied in-depth through personal interviews with the engineers who research and apply these technologies, and tours of laboratory models and full-scale installations. The most successful full-scale technologies investigated were developed in Holland, West Germany and Belgium. These technologies include vacuum extraction of hydrocarbons from soil, in situ washing of cadmium-polluted soil, rotating biocontractors for treating pesticides in ground water, high-temperature slagging incineration of low-level radioactive wastes, in situ steam stripping, and a number of landfarming and soil washing operations. The paper provides description of 13 site remediation techniques that have shown such promise in laboratory studies or in practice to warrant consideration of their use in the US

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568

  14. Biota Modeling in EPA's Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

    International Nuclear Information System (INIS)

    Manning, Karessa L.; Dolislager, Fredrick G.; Bellamy, Michael B.

    2016-01-01

    The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level tools that set forth Environmental Protection Agency's (EPA) recommended approaches, based upon currently available information with respect to risk assessment, for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has a residential gardening scenario and subsistence farmer exposure scenarios that require modeling of the transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC exposure scenarios. Recent improvements have been made in the biota modeling for these calculators, including newly derived biota intake rates, more comprehensive soil mass loading factors (MLFs), and more comprehensive soil to tissue transfer factors (TFs) for animals and soil to plant transfer factors (BV's). New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

  15. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 7

    International Nuclear Information System (INIS)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.; Fowler, J.W.

    1986-09-01

    The 644 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the seventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. References are arranged alphabetically by leading author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations

  16. Electrokinetic remediation of plutonium-contaminated nuclear site wastes: Results from a pilot-scale on-site trial

    International Nuclear Information System (INIS)

    Agnew, Kieran; Cundy, Andrew B.; Hopkinson, Laurence; Croudace, Ian W.; Warwick, Phillip E.; Purdie, Philip

    2011-01-01

    This paper examines the field-scale application of a novel low-energy electrokinetic technique for the remediation of plutonium-contaminated nuclear site soils, using soil wastes from the Atomic Weapons Establishment (AWE) Aldermaston site, Berkshire, UK as a test medium. Soils and sediments with varying composition, contaminated with Pu through historical site operations, were electrokinetically treated at laboratory-scale with and without various soil pre-conditioning agents. Results from these bench-scale trials were used to inform a larger on-site remediation trial, using an adapted containment pack with battery power supply. 2.4 m 3 (ca. 4 tonnes) of Pu-contaminated soil was treated for 60 days at a power consumption of 33 kW h/m 3 , and then destructively sampled. Radiochemical data indicate mobilisation of Pu in the treated soil, and migration (probably as a negatively charged Pu-citrate complex) towards the anodic compartment of the treatment cell. Soil in the cathodic zone of the treatment unit was remediated to a level below free-release disposal thresholds (1.7 Bq/g, or <0.4 Bq/g above background activities). The data show the potential of this method as a low-cost, on-site tool for remediation of radioactively contaminated soils and wastes which can be operated remotely on working sites, with minimal disruption to site infrastructure or operations.

  17. Remedial investigation work plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-03-01

    More than 200 contaminated sites created by past waste management practices have been identified at the Y-12 Plant. Many of the sites have been grouped into operable units based on priority and on investigative and remediation requirements. The Y-12 Plant is one of three major facilities on the ORR. The ORR contains both hazardous and mixed-waste sites that are subject to regulations promulgated under the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986. Under RCRA guidelines and requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions

  18. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

  19. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints

  20. EVALUATION OF PILOT TREATMENT EFFLUENTS FROM SUMMITVILLE MINE, CO, USING CERIODAPHNIA DUBIA, FATHEAD MINNOW (PIMEPHALES PROMELAS), AND RAINBOW TROUT (ONCORHYNCHUS MYKISS) TOXICITY TESTS

    Science.gov (United States)

    As part of a Superfund Innovative Technology Evaluation (SITE) Program, the U.S. Environmental Protection Agency evaluated a remediation technology at the Summitville Mine Superfund site in southern Colorado. The technology evaluated was a successive alkalinity producing system ...

  1. Efficient analysis using custom interactive visualization tools at a Superfund site

    International Nuclear Information System (INIS)

    Williams, G.; Durham, L.

    1992-01-01

    Custom visualization analysis programs were developed and used to analyze contaminant transport calculations from a three-dimensional numerical groundwater flow model developed for a Department of Energy Superfund site. The site hydrogeology, which is highly heterogenous, includes both fractured limestone and dolomite and alluvium deposits. Three-dimensional interactive visualization techniques were used to understand and analyze the three-dimensional, double-porosity modeling results. A graphical object oriented programming environment was applied to efficiently develop custom visualization programs in a coarse-grained data structure language. Comparisons were made, using the results from the three-dimensional, finite-difference model, between traditional two-dimensional analyses (contour and vector plots) and interactive three-dimensional techniques. Subjective comparison areas include the accuracy of analysis, the ability to understand the results of three-dimensional contaminant transport simulation, and the capability to transmit the results of the analysis to the project management. In addition, a quantitative comparison was made on the time required to develop a thorough analysis of the modeling results. The conclusions from the comparative study showed that the visualization analysis provided an increased awareness of the contaminant transport mechanisms, provided new insights into contaminant migration, and resulted in a significant time savings

  2. Efficient analysis using custom interactive visualization tools at a Superfund site

    Energy Technology Data Exchange (ETDEWEB)

    Williams, G. [Northwestern Univ., Evanston, IL (United States); Durham, L. [Argonne National Lab., IL (United States)

    1992-12-01

    Custom visualization analysis programs were developed and used to analyze contaminant transport calculations from a three-dimensional numerical groundwater flow model developed for a Department of Energy Superfund site. The site hydrogeology, which is highly heterogenous, includes both fractured limestone and dolomite and alluvium deposits. Three-dimensional interactive visualization techniques were used to understand and analyze the three-dimensional, double-porosity modeling results. A graphical object oriented programming environment was applied to efficiently develop custom visualization programs in a coarse-grained data structure language. Comparisons were made, using the results from the three-dimensional, finite-difference model, between traditional two-dimensional analyses (contour and vector plots) and interactive three-dimensional techniques. Subjective comparison areas include the accuracy of analysis, the ability to understand the results of three-dimensional contaminant transport simulation, and the capability to transmit the results of the analysis to the project management. In addition, a quantitative comparison was made on the time required to develop a thorough analysis of the modeling results. The conclusions from the comparative study showed that the visualization analysis provided an increased awareness of the contaminant transport mechanisms, provided new insights into contaminant migration, and resulted in a significant time savings.

  3. Superfund Record of Decision (EPA Region 2): NL Industries, Salem County, Pedricktown, NJ. (First remedial action), September 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-27

    The 44-acre NL Industries site is an inactive, secondary lead smelting facility in Pedricktown, Salem County, New Jersey. The site overlies the Cape May aquifer, a potential source of drinking water for local residents. In 1989, EPA began a multi-phased removal action. The Focused Feasibility Study resulted in the issuance of the Early Remedial Action Record of Decision (ROD), designated as Operable Unit (OU2). The nature and extent of remaining contamination on the site and areas adjacent to the site in various environmental media, such as soil, sediment, ground water, surface water, and air, are currently being evaluated and will be addressed as OU1 in a subsequent ROD. The primary contaminants of concern affecting the slag and lead oxide piles, sediment, debris, and standing surface water are metals including arsenic, chromium, and lead. The selected remedial action for the site is included.

  4. ANALYSIS OF REMEDIATION PROCESS OF THE GROUDWATER COTAMINATION IN AN ILLEGAL DUMPING SITE

    Science.gov (United States)

    Nishida, Norikazu; Furuichi, Toru; Ishii, Kazuei

    Among on-site remediation technologies applied to illegal dumping sites, a technology to remedy contaminated groundwater without removal of the dumped waste is expected to provide a great opportunity to fulfill a societal need due to its economic advantage compared to removal of all waste. However heterogeneously-distributed waste makes the remedial process difficult. In this study, an in situflushing technology was applied to an illegal dumping site in Kuwana city, Mie, in order to remedy groundwater contaminated with several volatile organic compounds (VOCs) within five years. The key to successfully achieve the target was to conduct a series of advanced remediation processes; introducing a new indicator by which multiple VOCs can be estimated integratelly, monitoring the progress of remediation with a contour map of VOC concentration as well as the weighted averages of the concentration derived from the indicator, pinpointing residual contaminants area, reexamining the plan, and taking additional steps that promote further remediation.

  5. Guidance for performing site inspections under CERCLA

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    This guidance presents EPA`s site inspection (SI) strategy. The strategy discusses procedural guidelines to investigate potential Superfund (CERCLA) sites for evaluation pursuant to the Hazard Ranking System (HRS), revised in accordance with the Superfund Amendments and Reauthorization Act of 1986. The HRS is the primary means by which EPA evaluates sites for superfund`s National Priorities List (NPL).

  6. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    Energy Technology Data Exchange (ETDEWEB)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  7. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    International Nuclear Information System (INIS)

    Ewy, Ann; Hays, David

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  8. Background report for the uranium-mill-tailings-sites remedial-action program

    International Nuclear Information System (INIS)

    1981-04-01

    The Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, mandates remedial action responsibilities to the Department of Energy for designated inactive uranium processing sites. To comply with the mandates of the Act, a program to survey and evaluate the radiological conditions at inactive uranium processing sites and at vicinity properties containing residual radioactive material derived from the sites is being conducted; the Remedial Action Program Office, Office of the Assistant Secretary for Nuclear Energy is implementing remedial actions at these processing sites. This report provides a brief history of the program, a description of the scope of the program, and a set of site-specific summaries for the 22 locations specified in the Act and three additional locations designated in response to Federal Register notices issued on August 17 and September 5, 1979. It is designed to be a quick source of background information on sites covered by the implementation program for Public Law 95-604

  9. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

  10. Environmental Chemistry Principles in Site Remediation (CEECHE 2018 Krakow Poland)

    Science.gov (United States)

    In CEECHE meeting, we will present scientific, engineering information and case studies on sustainable and innovative remediation technologies used in contaminated sites in Europe and the United States. One of the most important tasks to be performed to remediate contaminated si...

  11. Value engineering study for seletion of verticle barrier technology at a Superfund site

    International Nuclear Information System (INIS)

    Bryan, E.E.; Guglielmetti, J.L.; Butler, P.B.; Brill, M.P.

    1997-01-01

    A value engineering (VE) study was conducted to identify and evaluate vertical barrier technologies and alignments for a Superfund project in New Castle County, Delaware. The objective was to select and recommend the most appropriate vertical barrier(s) for two separate landfills and a portion of the manufacturing plant on the site. A VE team was assembled to identify and evaluate site specific issues related to effectiveness, constructability and cost for numerous vertical barrier technologies. Several cost-effective alternatives were identified that met project objectives. The VE study concluded that a composite vertical barrier system consisting of a soil-bentonite slurry trench and steel sheet piles would provide effective containment of the North Landfill. Additionally, the geologic confining unit specified in the Record of Decision (ROD) was found to be unsuitable as a vertical barrier key and a more suitable, shallow confining unit was discovered. This paper describes the value engineering process and results of the VE study for one of the landfills

  12. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    International Nuclear Information System (INIS)

    Beres, Christopher M.; Fort, E. Joseph; Boyle, James D.

    2013-01-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

  13. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    Energy Technology Data Exchange (ETDEWEB)

    Beres, Christopher M.; Fort, E. Joseph [Cabrera Services, Inc., 473 Silver Lane, East Hartford, CT 06118 (United States); Boyle, James D. [United States Army Corps of Engineers - Buffalo, 1776 Niagara Street, Buffalo, NY 14207 (United States)

    2013-07-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

  14. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.

  15. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    International Nuclear Information System (INIS)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations

  16. Superfund record of decision (EPA Region 10): Teledyne Wah Chang, Albany, OR. (first remedial action), December 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Teledyne Wah Chang (TWC) site, in Millersburg, Oregon, is an active plant used to produce nonferrous metals and products. The site consists of a 110-acre plant site, which contains the plant's former sludge ponds, and a 115-acre farm site, which contains four active wastewater sludge ponds. Portions of the TWC site are within the Willamette River's 100- and 500-year flood plain. The Wah Chang Corporation began operating a U.S. Bureau of Mines zirconium metal sponge pilot plant under contract with the U.S. Atomic Energy Commission in 1956. Additional facilities were subsequently built near the plant beginning in 1957 to produce nonferrous metals and products. The Lower River Solids Pond (LRSP) and Schmidt Lake sludge pond, which stored wastewater generated from the plant operations, are being addressed by this remedial action. The sludge in both the LRSP and Schmidt Lake contains heavy metals, organic compounds, and trace levels of radionuclides. The selected remedial action for the site includes excavation of 85,000 cubic yards of sludge with partial solidification of the sludge, followed by offsite disposal in a permitted solid waste landfill

  17. Remedial actions at the former Union Carbide Corporation uranium mill sites, Rifle, Garfield County, Colorado

    International Nuclear Information System (INIS)

    1990-03-01

    This appendix provides the information needed to understand the conceptual designs for the remedial action alternatives addressed in this environmental impact statement (EIS). It is intended to provide sufficient details for the reader to evaluate the feasibility and assess the impacts of each remedial action alternative. It is not intended to provide the detailed engineering necessary to implement the alternatives. Details of the preferred remedial action will be presented in the remedial action plan (RAP). The remedial action alternatives addressed in this EIS include no action, stabilization at the New Rifle site, disposal at the Estes Gulch site, and disposal at the Lucas Mesa site. All alternatives include interim actions to remediate existing health and safety hazards to the Rifle community that presently exist at the Old and New Rifle processing sites. It should be noted that the borrow sites included in this EIS were selected as the sources of the necessary borrow materials for impacts analyses purposes only. The borrow sites to be used for the remedial action will be selected during the final design. 21 figs., 18 tabs

  18. Comparison of the environmental impacts of two remediation technologies used at hydrocarbon contaminated sites

    International Nuclear Information System (INIS)

    Viikala, R.; Kuusola, J.

    2000-01-01

    Investigation and remediation of contaminated sites has rapidly increased in Finland during the last decade. Public organisations as well as private companies are investigating and remediating their properties, e.g. redevelopment or business transactions. Also numerous active and closed gasoline stations have been investigated and remediated during the last few years. Usually the contaminated sites are remediated to limit values regardless of the risk caused by contamination. The limit values currently used in Finland for hydrocarbon remediation at residential or ground water areas are 300 mg/kg of total hydrocarbons and 100 mg/kg of volatile hydrocarbons (boiling point < appr. 200 deg C). Additionally, compounds such as aromatic hydrocarbons have specific limit values. Remediation of hydrocarbon contaminated sites is most often carried out by excavating the contaminated soil and taking it to a landfill by lorries. As distances from the sites to landfills are generally rather long, from tens of kilometres to few hundred kilometres, it is evident that this type of remediation has environmental impacts. Another popular technology used at sites contaminated by volatile hydrocarbons is soil vapour extraction (SVE). SVE is a technique of inducing air flow through unsaturated soils by vapour extraction wells or pipes to remove organic contaminants with an off-gas treatment system. The purpose of this study was to evaluate some of the environmental impacts caused by remediation of hydrocarbon contaminated soil. Energy consumption and air emissions related remedial activities of the two methods were examined in this study. Remediation of the sites used in this study were carried out by Golder Associates Oy in different parts of Finland in different seasons. Evaluation was made by using life cycle assessment based approach

  19. Research Implementation and Quality Assurance Project Plan: An Evaluation of Hyperspectral Remote Sensing Technologies for the Detection of Fugitive Contamination at Selected Superfund Hazardous Waste Sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2009-01-01

    This project is a research collaboration between the U.S. Environmental Protection Agency (EPA) Office of Inspector General (OIG) and the U.S. Geological Survey (USGS) Eastern Geographic Science Center (EGSC), for the purpose of evaluating the utility of hyperspectral remote sensing technology for post-closure monitoring of residual contamination at delisted and closed hazardous waste sites as defined under the Comprehensive Environmental Response Compensation and Liability Act [CERCLA (also known as 'Superfund')] of 1980 and the Superfund Amendments and Reauthorization Act (SARA) of 1986.

  20. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms

  1. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

  2. Cost-efficient remediation of an upstream oilfield battery site

    Energy Technology Data Exchange (ETDEWEB)

    Siebert, L.D. [Imperial Oil Resources Canada, Calgary, AB (Canada); Bedard, G.; Pouliot, M.; Soucy, F.; Faucher, C.; Corbin, R. [Biogenie Inc., Quebec City, PQ (Canada)

    2003-07-01

    The soil at an oilfield battery site, located 18 kilometres (km) northwest of Devon, Alberta has been contaminated with crude oil and salt, following years of operation. Surrounding the site is flat farmland intended for future agricultural production. A remedial program aimed at complying with Tier I criteria of the Alberta Soil and Water Quality Guidelines for Hydrocarbons at Upstream Oil and Gas Facilities (ASWQG) of Alberta Environment, was developed and implemented. Characterization of the site was carried out in 1997 to delineate a salt plume, followed by a second sampling campaign in 1999, which all together revealed three impacted areas. A supplementary characterization was performed in 2001 by Biogenie in an effort to better determine the nature and level of petroleum contamination and more accurately evaluate the volume of contaminated soil. A three-dimensional Visualization software integrating a Kriging geostatistical model was used for this purpose. The results indicated that an estimated 8,800 cubic metres of contaminated soil would need to be excavated and treated. The next phase involved an evaluation of the various remedial options, which was accomplished using a biotreatability study. The remediation program selected involved the excavation of the contaminated soil and segregation of source material, the ex-situ Biopile treatment of the source material to meet Class II landfill criteria, and the ex-situ Biopile treatment of the contaminated soil followed by its use as backfill on site. The biotreatability study proved to be a strategic tool in the remediation effort. 1 tab., 2 figs.

  3. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale

  4. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado

  5. Methodology to remediate a mixed waste site

    International Nuclear Information System (INIS)

    Berry, J.B.

    1994-08-01

    In response to the need for a comprehensive and consistent approach to the complex issue of mixed waste management, a generalized methodology for remediation of a mixed waste site has been developed. The methodology is based on requirements set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA) and incorporates ''lessons learned'' from process design, remediation methodologies, and remediation projects. The methodology is applied to the treatment of 32,000 drums of mixed waste sludge at the Oak Ridge K-25 Site. Process technology options are developed and evaluated, first with regard to meeting system requirements and then with regard to CERCLA performance criteria. The following process technology options are investigated: (1) no action, (2) separation of hazardous and radioactive species, (3) dewatering, (4) drying, and (5) solidification/stabilization. The first two options were eliminated from detailed consideration because they did not meet the system requirements. A quantitative evaluation clearly showed that, based on system constraints and project objectives, either dewatering or drying the mixed waste sludge was superior to the solidification/stabilization process option. The ultimate choice between the drying and the dewatering options will be made on the basis of a technical evaluation of the relative merits of proposals submitted by potential subcontractors

  6. Methodology to remediate a mixed waste site

    Energy Technology Data Exchange (ETDEWEB)

    Berry, J.B.

    1994-08-01

    In response to the need for a comprehensive and consistent approach to the complex issue of mixed waste management, a generalized methodology for remediation of a mixed waste site has been developed. The methodology is based on requirements set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA) and incorporates ``lessons learned`` from process design, remediation methodologies, and remediation projects. The methodology is applied to the treatment of 32,000 drums of mixed waste sludge at the Oak Ridge K-25 Site. Process technology options are developed and evaluated, first with regard to meeting system requirements and then with regard to CERCLA performance criteria. The following process technology options are investigated: (1) no action, (2) separation of hazardous and radioactive species, (3) dewatering, (4) drying, and (5) solidification/stabilization. The first two options were eliminated from detailed consideration because they did not meet the system requirements. A quantitative evaluation clearly showed that, based on system constraints and project objectives, either dewatering or drying the mixed waste sludge was superior to the solidification/stabilization process option. The ultimate choice between the drying and the dewatering options will be made on the basis of a technical evaluation of the relative merits of proposals submitted by potential subcontractors.

  7. Biota Modeling in EPA's Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

    Energy Technology Data Exchange (ETDEWEB)

    Manning, Karessa L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dolislager, Fredrick G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bellamy, Michael B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-11-01

    The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level tools that set forth Environmental Protection Agency's (EPA) recommended approaches, based upon currently available information with respect to risk assessment, for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has a residential gardening scenario and subsistence farmer exposure scenarios that require modeling of the transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC exposure scenarios. Recent improvements have been made in the biota modeling for these calculators, including newly derived biota intake rates, more comprehensive soil mass loading factors (MLFs), and more comprehensive soil to tissue transfer factors (TFs) for animals and soil to plant transfer factors (BV's). New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

  8. Influence of a chlor-alkali superfund site on mercury bioaccumulation in periphyton and low-trophic level fauna

    Science.gov (United States)

    Buckman, Kate L.; Marvin-DiPasquale, Mark C.; Taylor, Vivien F.; Chalmers, Ann T.; Broadley, Hannah J.; Agee, Jennifer L.; Jackson, Brian P.; Chen, Celia Y.

    2015-01-01

    In Berlin, New Hampshire, USA, the Androscoggin River flows adjacent to a former chlor-alkali facility that is a US Environmental Protection Agency Superfund site and source of mercury (Hg) to the river. The present study was conducted to determine the fate and bioaccumulation of methylmercury (MeHg) to lower trophic-level taxa in the river. Surface sediment directly adjacent to the source showed significantly elevated MeHg (10–40× increase, mean ± standard deviation [SD]: 20.1 ± 24.8 ng g–1 dry wt) and total mercury (THg; 10–30× increase, mean ± SD: 2045 ± 2669 ng g–1 dry wt) compared with all other reaches, with sediment THg and MeHg from downstream reaches elevated (3–7× on average) relative to the reference (THg mean ± SD: 33.5 ± 9.33 ng g–1 dry wt; MeHg mean ± SD: 0.52 ± 0.21 ng g–1 dry wt). Water column THg concentrations adjacent to the point source for both particulate (0.23 ng L–1) and dissolved (0.76 ng L–1) fractions were 5-fold higher than at the reference sites, and 2-fold to 5-fold higher than downstream. Methylmercury production potential of periphyton material was highest (2–9 ng g–1 d–1 dry wt) adjacent to the Superfund site; other reaches were close to or below reporting limits (0. 1 ng g–1 d–1 dry wt). Total Hg and MeHg bioaccumulation in fauna was variable across sites and taxa, with no clear spatial patterns downstream of the contamination source. Crayfish, mayflies, and shiners showed a weak positive relationship with porewater MeHg concentration.

  9. Superfund record of decision (EPA Region 6): Oklahoma Refining Company, Cyril, OK. (First remedial action), June 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 160-acre Oklahoma Refining site is a petroleum refinery located on the eastern edge of Cyril, Oklahoma, in Caddo County. The facility included refinery process areas, bulk storage tanks, waste pits, wastewater treatment ponds, and a land treatment area. During the mid-1980's, EPA investigations revealed large-scale organic and heavy metal contamination of onsite soil and ground water. In 1990, EPA conducted a removal action, which included characterization and removal of drums, plugging wells, and wildlife protection measures. The ROD addresses the remediation of onsite contaminated soil, sediment, surface water, and ground water as a final remedy. The primary contaminants of concern affecting the soil, sediment, ground water, and surface water are VOCs, including benzene, toluene, and xylenes; other organics, including PAHs and phenols; and metals, including arsenic, chromium, and lead. The selected remedial action for the site is included

  10. Superfund Record of Decision (EPA Region 2): Montclair/West Orange, Radium, NJ. (First Remedial Action), June 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Montclair/West Orange Radium site is in the towns of Montclair and West Orange in Essex County, New Jersey. The soil at the site is contaminated with radioactive-waste materials suspected to have originated from radium processing or utilization facilities located nearby during the early 1900s. Temporary radon ventilation systems and gamma-radiation shielding have been installed and maintained by EPA and the State to reduce indoor exposures. The primary contaminant of concern affecting the soil and structures is radium 226 which decays to radon gas. The selected remedial action for the site includes excavation of approximately 41,000 cu yd of highly contaminated soil and an unspecified amount of debris followed by offsite disposal; installation and maintenance of indoor engineering controls at less contaminated properties; environmental monitoring to ensure remedy effectiveness; and continuation of a treatment technology study for future actions. EPA deferred a final continuation of a treatment-technology study for future action

  11. Remediation of polluted sites. The risks, liabilities and costs; Rehabilitation de sites pollues. Quels risques? Quelles responsabilites? Quels couts?

    Energy Technology Data Exchange (ETDEWEB)

    Paquot, A. [Ministere de l' Ecologie et du Developpement Durable 75 - Paris (France); Darmendrail, D. [BRGM, 75 - Paris (France); Mensah, J. [Etablissement public foncier Nord Pas de Calais, 59 - Lille (France); Costil, J. [BURGEAP, 69 - Lyon (France); Carbon, S. [Gaz de France (GDF), 75 - Paris (France); Gervaise, Y. [SGS Multilab, 51 - Rouen (France); Bonin, H. [GRS Valtech, 69 - Rilleux-la-Pape (France); Delfaud, L. [Projenor, 59 - Lille (France); Croze, V. [ICF Environnement, 92 - Gennevilliers (France); Ricour, J. [ANTEA, des solutions globales, durables et rentables, 45 - Orleans (France); Langlois, P.

    2003-10-01

    This conference deals with the following topics: the mastery of the economic, regulation, juridical and contractual framework; liabilities and financing distribution between the intervenors; the diagnostic cost; the financial security in the sites acquisition and social right transfer; the efficient technologies of sites remediation; the communication near the site in remediation. (A.L.B.)

  12. Pilot-scale incineration of comtaminated soils from the drake chemical superfund site. Final report

    International Nuclear Information System (INIS)

    King, C.; Lee, J.W.; Waterland, L.R.

    1993-03-01

    A series of pilot-scale incineration tests were performed at the U.S. Environmental Protection Agency's (EPA's) Incineration Research Facility to evaluate the potential of incineration as an option to treat contaminated soils from the Drake Chemical Superfund site in Lock Haven, Pennsylvania. The soils at the Drake site are reported to be contaminated to varying degrees with various organic constituents and several hazardous constituent trace metals. The purpose of the test program was to evaluate the incinerability of selected site soils in terms of the destruction of contaminant organic constituents and the fate of contaminant trace metals. All tests were conducted in the rotary kiln incineration system at the IRF. Test results show that greater than 99.995 percent principal organic hazardous constituent (POHC) destruction and removal efficiencies (DRE) can be achieved at kiln exit gas temperatures of nominally 816 C (1,500 F) and 538 C (1,000 F). Complete soil decontamination of semivolatile organics was achieved; however, kiln ash levels of three volatile organic constituents remained comparable to soil levels

  13. Superfund Record of Decision (EPA Region 2): Glen Ridge Radium, NJ. (First Remedial Action), June 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Glen Ridge Radium site is in the Borough of Glen Ridge and the town of East Orange in Essex County, New Jersey. The soil at the site is contaminated to varying degrees with radioactive waste materials suspected to have originated from radium processing or utilization facilities located nearby during the early 1900s. Temporary radon ventilation systems and gamma-radiation shielding have been installed and maintained by EPA and the State to reduce indoor exposures. The primary contaminant of concern affecting the soil and structures in radium 226 which delays to radon gas. The selected remedial action includes excavation of approximately 41,000 cu yd of highly contaminated soil and an unspecified amount of debris followed by offsite disposal; installation and maintenance of indoor engineering controls at less contaminated properties; environmental monitoring to ensure remedy effectiveness; and continuation of a treatment technology study for future actions

  14. Remedial actions of nuclear safety shot sites: Double Tracks and Clean Slates

    International Nuclear Information System (INIS)

    Sanchez, M.; Shotton, M.; Lyons, C.

    1998-03-01

    Remedial actions of plutonium (Pu)-contaminated soils are in the preliminary stages of development at the Nevada Test Site (NTS). Interim clean-up actions were completed at the Double Tracks and Clean Slate 1 safety shot sites in 1996 and 1997, respectively. Soil at both sites, with a total transuranic activity greater than 20 picoCuries per gram (pCi/g), was excavated and shipped to the NTS for disposal. Characterization and assessment efforts were initiated at the Double Tracks site in 1995, and the clean-up of this site as an interim action was completed in 1996. Clean-up of this site consisted of taking site-specific data and applying rationale for dose and risk calculations in selecting parameter values for the interim corrective action level. The remediation process included excavating and stockpiling the contaminated soil and loading the soil into supersacks with approximately 1,513 cubic meters (53,500 cubic feet) being shipped to the NTS for disposal. In 1997, remediation began on the Clean Slate 1 site on which characterization had already been completed using a very similar approach; however, the site incorporated lessons learned, cost efficiencies, and significant improvements to the process. This paper focuses on those factors and the progress that has been made in cleaning up the sites. The application of a technically reasonable remediation method, as well as the cost factors that supported transport and disposal of the low-level waste in bulk are discussed

  15. Annual status report on the inactive uranium mill tailings sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    Assessments of inactive uranium mill tailings sites in the United States led to the designation of 25 processing sites for remedial action under the provisions of Section 102(a) Public Law 95-604. The Department of Energy assessed the potential health effects to the public from the residual radioactive materials on or near the 25 sites; and, with the advice of the Environmental Protection Agency, the Secretary established priorities for performing remedial action. In designating the 25 sites and establishing the priorities for performing remedial action, the Department of Energy consulted with the Environmental Protection Agency, Nuclear Regulatory Commission, Department of the Interior, governors of the affected States, Navajo Nation, and appropriate property owners. Public participation in this process was encouraged. During Fiscal Year 1980, Department of Energy will be conducting surveys to verify the radiological characterization at the designated processing sites; developing cooperative agreements with the affected States; and initiating the appropriate National Environmental Policy Act documentation prior to conducting specific remedial actions.

  16. Risk-based economic decision analysis of remediation options at a PCE-contaminated site

    DEFF Research Database (Denmark)

    Lemming, Gitte; Friis-Hansen, P.; Bjerg, Poul Løgstrup

    2010-01-01

    by the remediation activities. More attention is increasingly being given to these secondary environmental impacts when evaluating remediation options. This paper presents a methodology for an integrated economic decision analysis which combines assessments of remediation costs, health risk costs and potential...... at a downstream groundwater well. Potential environmental impacts on the local, regional and global scales due to the site remediation activities are evaluated using life cycle assessments (LCA). The potential impacts on health and environment are converted to monetary units using a simplified cost model. A case......Remediation methods for contaminated sites cover a wide range of technical solutions with different remedial efficiencies and costs. Additionally, they may vary in their secondary impacts on the environment i.e. the potential impacts generated due to emissions and resource use caused...

  17. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action

  18. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use

  19. Remediation of hazardous waste sites by heap leaching

    International Nuclear Information System (INIS)

    Samani, Z.; Hanson, A.; Dwyer, B.

    1994-01-01

    Efforts are being made to devise technologies and treatment systems to remediate contaminated soil-on site without generating significant wastes for off-site disposal. Heap leaching, a technique used extensively in the mining industry, has been investigated as a method for remediation of hazardous chemical contamination of the vadose zone. In the mining industry, metal-bearing ore is excavated and mounded on a pad. The metals are removed by passing a special leaching solution through the ore. In this study, the removal of chromium(VI) from the New Mexico soils (sand, sandy loam, and clay) using heap leaching was evaluated at a column scale. The heap leaching study demonstrated greater than 99% removal of Cr(VI) from all three soils using tap water as the leaching agent. (author) 13 figs., 5 tabs., 21 refs

  20. Remediating sites contaminated with heavy metals

    International Nuclear Information System (INIS)

    Swartzbaugh, J.; Sturgill, J.; Cormier, B.; Williams, H.D.

    1992-01-01

    This article is intended to serve as a reference for decision makers who must choose an approach to remediate sites contaminated with heavy metals. Its purpose is to explain pertinent chemical and physical characteristics of heavy metals, how to use these characteristics to select remedial technologies, and how to interpret and use data from field investigations. Different metal species are typically associated with different industrial processes. The contaminant species behave differently in various media (i.e., groundwater, soils, air), and require different technologies for containment and treatment. We focus on the metals that are used in industries that generate regulated waste. These include steelmaking, paint and pigment manufacturing, metal finishing, leather tanning, papermaking, aluminum anodizing, and battery manufacturing. Heavy metals are also present in refinery wastes as well as in smelting wastes and drilling muds

  1. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  2. Superfund Record of Decision (EPA region 5): Fultz Landfill, Byesville, OH. (First remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 30-acre Fultz Landfill site is a privately owned inactive sanitary landfill on the north slope of a ridge that overlies abandoned coal mines in Jackson Township, Guernsey County, Ohio. The site lies within the drainage basin of Wills Creek, which flows north adjacent to the site and is used by the city of Cambridge as the municipal water supply. The northern half of the landfill lies in an unreclaimed strip mine where surface mine spoil and natural soil form a shallow aquifer. During the 1970's, the landfill operator was cited for various violations. Investigations in 1988 by EPA indicated that ground water and leachate contaminants emanating from the site have contaminated the shallow aquifer and, to a lesser extent, the deep mine aquifer. The Record of Decision (ROD) addresses all contaminated media, and provides a final remedy for the site. The primary contaminants of concern affecting the soil, sediment, debris, ground water, and surface water are VOCs including benzene, PCE, TCE, toluene, and xylenes; other organics including PAHs and phenols; metals including arsenic, chromium, and lead; and other inorganics. The selected remedial action for this site is included

  3. Towards identifying the next generation of superfund and hazardous waste site contaminants

    Science.gov (United States)

    Ela, Wendell P.; Sedlak, David L.; Barlaz, Morton A.; Henry, Heather F.; Muir, Derek C.G.; Swackhamer, Deborah L.; Weber, Eric J.; Arnold, Robert G.; Ferguson, P. Lee; Field, Jennifer A.; Furlong, Edward T.; Giesy, John P.; Halden, Rolf U.; Henry, Tala; Hites, Ronald A.; Hornbuckle, Keri C.; Howard, Philip H.; Luthy, Richard G.; Meyer, Anita K.; Saez, A. Eduardo; vom Saal, Frederick S.; Vulpe, Chris D.; Wiesner, Mark R.

    2011-01-01

    Background This commentary evolved from a workshop sponsored by the National Institute of Environmental Health Sciences titled "Superfund Contaminants: The Next Generation" held in Tucson, Arizona, in August 2009. All the authors were workshop participants.

  4. Characterization of radioactively contaminated sites for remediation purposes

    International Nuclear Information System (INIS)

    1998-05-01

    Characterization of the contaminated site is essential before embarking on a programme for its remediation and ultimate restoration. Reliable and suitable data must be obtained regarding the distribution and physical, chemical and nuclear properties of all radioactive contaminants. Characterization data is necessary for assessing the associated radiation risks and is used in support of the required engineering design and project planning for the environmental restoration. In addition, continuing characterization can provide information regarding efficiency of the cleanup methods and influence possible redirection of work efforts. Similarly, at the end of the remediation phase, characterization and ongoing monitoring can be used to demonstrate completion and success of the cleanup process. The suggested methodology represents a contribution attempting to solve the issue of preremediation characterization in a general manner. However, a number of difficulties might make this methodology unsuitable for general application across the diverse social, environmental and political systems in the IAEA Member States. This TECDOC covers the methodologies used to characterize radioactively contaminated sites for the purpose of remediating the potential sources of radiation exposure and assessing the hazards to human health and the environment

  5. New photocatalytic process provides 99.9+% reduction of VOC at Superfund site

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-03-01

    A new photocatalytic process, dubbed the A-I-R-2000 Process, is described. The process is said to offer marked economic advantages, while providing consistent 99.9+% reduction of volatile organic compounds (VOCs) from soil vapours and groundwater at the Stamina Mills Superfund site in North Smithfield, Rhode Island. The A-I-R-2000 process has been developed by KSE Inc., of Amherst, Massachusetts, and has been licensed exclusively worldwide to Trojan Technologies, Inc., of London, Ontario. The process consists essentially of adsorption of VOCs onto a UV light-activated proprietary catalysts, for breakdown to carbon dioxide and water, and also to hydrochloric acid and a small amount of chlorine gas when the VOCs are chlorinated. With a maximum internal operating temperature of 125 degrees F, it is a low-energy system when compared to other catalytic technologies that feature thermal catalytic equipment. 1 photo.

  6. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas

    International Nuclear Information System (INIS)

    Chernoff, A.R.; Lacker, D.K.

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas

  7. Remediation of uranium contaminated sites: clean-up activities in Serbia

    International Nuclear Information System (INIS)

    Raicevic, S.; Raicevic, J. . E-mail address of corresponding author: raich@beotel.yu; Raicevic, S.)

    2005-01-01

    One of the serious environmental problems in Serbia represent sites contaminated with depleted uranium (DU) during past war activities. According to UNEP reports and our findings there are two types of contamination: (i) localized points of high, concentrated contamination where DU penetrators enter the soil, and (ii) low level of widespread DU contamination, which indicates that during the conflict DU dust was dispersed into the environment. Remediation of these sites is an urgent need because they represent a permanent threat to the population living in this area. Here we give a brief description of approaches commonly used in remediation of DU contaminated sites, and an overview of current clean-up activities performed in Serbia. (author)

  8. Superfund Record of Decision (EPA Region 2): Sinclair Refinery, Allegany County, Wellsville, NY. (Second remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The Sinclair Refinery site is a former refinery in Wellsville, Allegany County, New York. The site is composed of a 90-acre refinery area, 10-acre landfill area, and 14-acre offsite tank farm. From 1901 to 1958, the site was used to process Pennsylvania grade crude oil until a fire in 1958 halted operations. Currently, some private companies and the State University of New York occupy the site. A 1981 site inspection revealed that debris from the eroding landfill area has washed into and contaminated the Genesee River. The ROD addresses OU2, remediation of the remaining contaminated areas at the site located within the 90-acre refinery area and the offsite tank farm including the contaminated ground water beneath the refinery. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene and xylenes, semi-volatile compounds including naphthalene and nitrobenzene, and metals including arsenic and lead. The selected remedial action for the site is included

  9. Risk-based remediation of polluted sites: A critical perspective.

    Science.gov (United States)

    Kuppusamy, Saranya; Venkateswarlu, Kadiyala; Megharaj, Mallavarapu; Mayilswami, Srinithi; Lee, Yong Bok

    2017-11-01

    Sites contaminated with chemical pollutants represent a growing challenge, and remediation of such lands is of international concern. Risk-based land management (RBLM) is an emerging approach that integrates risk assessment practices with more traditional site-specific investigations and remediation activities. Developing countries are yet to adopt RBLM strategies for remediation. RBLM is considered to be practical, scientifically defensible and cost-efficient. However, it is inherently limited by: firstly, the accuracy of risk assessment models used; secondly, ramifications of the fact that they are more likely to leave contamination in place; and thirdly, uncertainties involved and having to consider the total concentrations of all contaminants in soils that overestimate the potential risks from exposure to the contaminants. Consideration of contaminant bioavailability as the underlying basis for risk assessment and setting remediation goals of those contaminated lands that pose a risk to environmental and human health may lead to the development of a more sophisticated risk-based approach. However, employing the bioavailability concept in RBLM has not been extensively studied and/or legalized. This review highlights the extent of global land contamination, and the concept of risk-based assessment and management of contaminated sites including its advantages and disadvantages. Furthermore, the concept of bioavailability-based RBLM strategy has been proposed, and the challenges of RBLM and the priority areas for future research are summarized. Thus, the present review may help achieve a better understanding and successful implementation of a sustainable bioavailability-based RBLM strategy. Copyright © 2017 Elsevier Ltd. All rights reserved.

  10. Superfund Record of Decision (EPA Region 5): Midco II, Gary, IN. (First remedial action), (amendment), April 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The 7-acre Midco II site is an abandoned chemical waste storage and disposal facility in Gary, Indiana. Land use in the surrounding area is predominantly industrial. The underlying aquifer, which is used primarily for non-drinking purposes, is highly susceptible to contamination from surface sources. From 1976 to 1978, the site was used for treatment, storage, and disposal of chemical and bulk liquid wastes. The ROD amends a 1989 ROD that addressed the remaining contaminated soil, pit wastes, and ground water by treatment of an estimated 35,000 cubic yards of soil wastes. The amended remedy reduces the estimated amount of soil to be treated, as a result of new information on arsenic data and amended soil CALs, further defines the site cover requirements, and further defines the requirements for deep well injection of contaminated ground water. The primary contaminants of concern affecting the subsurface soil, sediment, and ground water are VOCs, including methylene chloride, benzene, toluene, TCE, and xylenes; other organics, including PCBs, phenols, and PAHs; and metals, including chromium, and lead. The amended remedial action for the ROD is included

  11. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Rifle, Colorado

    International Nuclear Information System (INIS)

    1990-02-01

    This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Rifle sites. That remedial action consists of removing approximately 4,185,000 cubic yards (cy) of tailings and contaminated materials from their current locations, transporting, and stabilizing the tailings material at the Estes Gulch disposal site, approximately six miles north of Rifle. The tailings and contaminated materials are comprised of approximately 597,000 cy from Old Rifle, 3,232,000 cy from New Rifle, and 322,000 cy from vicinity properties and about 34,000 cy from demolition. The remedial action plan includes specific design requirements for the detailed design and construction of the remedial action. An extensive amount of data and supporting information have been generated for this remedial action and cannot all be incorporated into this document. Pertinent information and data are included with reference given to the supporting documents

  12. Remedial investigation report on waste area grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 4, Appendix C, Risk assessment

    International Nuclear Information System (INIS)

    1995-09-01

    Waste Area Grouping (WAG) 5 is part of Oak Ridge National Laboratory (ORNL) and is located on the United States Department of Energy's Oak Ridge Reservation (DOE-ORR). The site lies southeast of Haw Ridge in Melton Valley and comprises approximately 32 ha (80 ac) [12 ha (30 ac) of forested area and the balance in grassed fields]. Waste Area Grouping 5 consists of several contaminant source areas for the disposal of low-level radioactive, transuranic (TRU), and fissile wastes (1959 to 1973) as well as inorganic and organic chemical wastes. Wastes were buried in trenches and auger holes. Radionuclides from buried wastes are being transported by shallow groundwater to Melton Branch and White Oak Creek. Different chemicals of potential concern (COPCs) were identified (e.g., cesium-137, strontium-90, radium-226, thorium-228, etc.); other constituents and chemicals, such as vinyl chloride, bis(2-ethylhexyl)phthalate, trichloroethene, were also identified as COPCs. Based on the results of this assessment contaminants of concern (COCs) were subsequently identified. The objectives of the WAG 5 Baseline Human Health Risk Assessment (BHHRA) are to document the potential health hazards (i.e., risks) that may result from contaminants on or released from the site and provide information necessary for reaching informed remedial decisions. As part of the DOE-Oak Ridge Operations (ORO), ORNL and its associated waste/contamination sites fall under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), also known as Superfund under the Superfund Amendments and Reauthorization Act (SARA). The results of the BHHRA will (1) document and evaluate risks to human health, (2) help determine the need for remedial action, (3) determine chemical concentrations protective of current and future human receptors, and (4) help select and compare various remedial alternatives.

  13. Remedial action at the Acid/Pueblo Canyon site, Los Alamos, New Mexico. Final report

    International Nuclear Information System (INIS)

    1984-10-01

    The Acid/Pueblo Canyon site (TA-45) was designated in 1976 for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). During the period 1943 to 1964 untreated and treated liquid wastes generated by nuclear weapons research activities at the Los Alamos Scientific Laboratory (LASL) were discharged into the two canyons. A survey of the site conducted by LASL in 1976 to 1977 identified two areas where radiological contamination exceeded criteria levels. The selected remedial action was based on extensive radiological characterization and comprehensive engineering assessments and comprised the excavation and disposal of 390 yd 3 of contaminated soil and rock. This document describes the background to the remedial action, the parties involved in administering and executing it, the chronology of the work, verification of the adequacy of the remedial action, and the cost incurred. 14 references, 5 figures, 5 tables

  14. Radiological guidelines for application to DOE's Formerly Utilized Sites Remedial Action Program. [FUSRAP sites

    Energy Technology Data Exchange (ETDEWEB)

    1983-03-01

    The US Department of Energy has implemented a program to evaluate and, where necessary, take action to protect the public from contamination at sites that were used in the past to process and/or store radioactive materials for the former US Army Corps of Engineers Manhattan Engineer District or the US Atomic Energy Commission. The program is identified as the Formerly Utilized Sites Remedial Action Program (FUSRAP). This document describes methods considered appropriate for the evaluation of health effects that might possible be caused by radioactive contamination at FUSRAP sites. This assessment methodology is applied to a typical site for the purposeof deriving guidelines for the cleanup of contaminated soil. Additional guidance is provided for planning site-specific remedial action that is consistent with the overall objectives of FUSRAP.

  15. Specialized sorting and measuring system for site remediation

    International Nuclear Information System (INIS)

    Runge, H.; Christ, G.

    2001-01-01

    The machine design and measurement philosophy of the SSGE, developed for excavation and treatment of some 21,000 metric tons of ground material and concrete from NUKEM decommissioned fuel element factory, have already been passed the official licensing procedure. The start up of site clean-up is scheduled for summer 2001. With the SSGE there has been made available a method to safe and economically remediate contaminated ground of nuclear sites. The SSEG, being a mobile system, can be applied at various sites

  16. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use

  17. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    International Nuclear Information System (INIS)

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D ampersand D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D ampersand D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword

  18. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

  19. LCA of contaminated site remediation - integration of site-specific impact assessment of local toxic impacts

    DEFF Research Database (Denmark)

    Lemming, Gitte; Hauschild, Michael Zwicky; Chambon, Julie Claire Claudia

    2011-01-01

    impacts have typically been assessed using site-generic characterization models representing a continental scale and excluding the groundwater compartment. Soil contaminants have therefore generally been assigned as emissions to surface soil or surface water compartments. However, such site-generic...... assessments poorly reflect the fate of frequent soil contaminants such as chloroethenes as they exclude the groundwater compartment and assume that the main part escapes to the atmosphere. Another important limitation of the generic impact assessment models is that they do not include the formation......The environmental impacts from remediation can be divided into primary and secondary impacts. Primary impacts cover the local impacts associated with the on-site contamination, whereas the secondary impacts are impacts on the local, regional and global scale generated by the remediation activities...

  20. Remediation of Site of Decommissioning Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Danilovich, A.S.; Ivanov, O.P.; Lemus, A.V.; Pavlenko, V.I.; Potapov, V.N.; Semenov, S.G.; Shisha, A.D.; Chesnokov, A.V. [National Research Center ' Kurchatov Institute' , 123182, Moscow (Russian Federation)

    2014-07-01

    In the world the most widespread method of soil decontamination consists of removing the contaminated upper layer and sending it for long-term controlled storage. However, implementation of this soil cleanup method for remediation of large contaminated areas would involve high material and financial expenditures, because it produces large amounts of radioactive waste demanding removal to special storage sites. Contaminated soil extraction and cleanup performed right on the spot of remediation activities represents a more advanced and economically acceptable method. Radiological separation of the radioactive soil allows reducing of amount of radwaste. Studies performed during the liquidation of the Chernobyl accident consequences revealed that a considerable fraction of radioactivity is accumulated in minute soil grains. So, the separation of contaminated soil by size fractions makes it possible to extract and concentrate the major share of radioactivity in the fine fraction. Based on these researches water gravity separation technology was proposed by Bochvar Institute. The method extracts the fine fraction from contaminated soil. Studies carried out by Bochvar Institute experts showed that, together with the fine fraction (amounting to 10-20% of the initial soil), this technology can remove up to 85-90% of contaminating radionuclides. The resulting 'dirty' soil fraction could be packaged into containers and removed as radwaste, and decontaminated fractions returned back to their extraction site. Use of radiological and water gravity separations consequently increases the productivity of decontamination facility. Efficiency of this technology applied for contaminated soil cleanup was confirmed in the course of remediation of the contaminated territories near decommissioning research reactor in the Kurchatov Institute. For soil cleaning purposes, a special facility implementing the technology of water gravity separation and radiometric monitoring of soil

  1. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  2. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  3. 76 FR 44580 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Science.gov (United States)

    2011-07-26

    ... FURTHER INFORMATION CONTACT: Lois Gartner, Assessment and Remediation Division, Office of Superfund... capacities of state action and administration of community activities at Fund-lead NPL sites. Remedial... at new and ongoing state-lead sites and at all state-lead, Federal-lead and Federal Facility sites...

  4. USA - Paper provided by the US delegation to the RWMC. Site Decontamination and Clean-up Under the U.S. EPA 'Superfund'

    International Nuclear Information System (INIS)

    2003-01-01

    Contaminated and hazardous waste sites, including nuclear facilities, may be subject to clean-up under the U.S. Environmental Protection Agency (EPA). The Comprehensive Environmental Response, Compensation, and Liabilities Act (CERCLA), commonly known as 'Superfund', authorises EPA to respond to releases or threatened releases of hazardous substances, pollutants, or contaminants that may endanger public health or the environment. The legislation defines hazardous substances to include radiation. Entry into Superfund: The EPA may be notified of a site potentially requiring clean up from any source. Potential sites are evaluated under a numerical hazard ranking system, and are then included on the clean-up list ('National Priorities List') if they meet an established threshold. Nuclear Facilities and Radioactively Contaminated Sites under Superfund: Any site may be subject to CERCLA action if EPA determines that it poses a hazard. There are three major types of sites that have been or are subject to action under this program: Federal nuclear facilities, Decommissioned facilities, Privately-owned, unlicensed sites Liabilities Under Superfund: The authorising legislation specifically provided for liability of persons responsible for releases of hazardous waste at uncontrolled sites. Liability under CERCLA is 'strict,' 'retroactive,' and 'joint and several'. Thus, the burden of proof for disproving liability is quite high, and that the extent of the liability is not limited to the share of the waste or hazardous substance contributed by a party. The EPA may pursue liable parties to recover past and future costs associated with clean-up, including direct costs and indirect costs incurred by both EPA and its contractors. Clean-Up Levels: Clean-up goals and technologies are established on a site-specific basis. In general, clean-up goals must meet risk requirements and be consistent with applicable standards. Other factors such as community acceptance, volume reduction

  5. Phase I Source Investigation, Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, Nancy P; Evans, Nathan R

    2002-12-18

    This report represents Phase I of a multi-phase approach to a source investigation of DDT at the Heckathorn Superfund Site, Richmond, California, the former site of a pesticide packaging plant, and the adjacent waterway, the Lauritzen Channel. Potential identified sources of contamination were from sloughed material from undredged areas (such as side banks) and from outfall pipes. Objectives of Phase I included the (1) evaluation of pesticide concentrations associated with discharge from outfalls, (2) identification of additional outfalls in the area, (3) identification of type, quantity, and distribution of sediment under the Levin pier, (4) quantification of pesticide concentrations in sediment under the pier, and (5) evaluation of sediment structure and slope stability under the pier. Field operations included the collection of sediment directly from inside the mouths of outfall pipes, when possible, or the deployment of specially designed particle traps where direct sampling was problematic. Passive water samplers were placed at the end of known outfall pipes and analyzed for DDT and other pesticides of concern. Underwater dive surveys were conducted beneath the Levin pier to document type, slope, and thickness of sediment. Samples were collected at locations of interest and analyzed for contaminants. Also sampled was soil from bank areas, which were suspected of potentially contributing to continued DDT contamination of the Lauritzen Channel through erosion and groundwater leaching. The Phase I Source Investigation was successful in identifying significant sources of DDT contamination to Lauritzen Channel sediment. Undredged sediment beneath the Levin pier that has been redistributed to the channel is a likely source. Two outfalls tested bear further investigation. Not as well-defined are the contributions of bank erosional material and groundwater leaching. Subsequent investigations will be based on the results of this first phase.

  6. Almost remediation of saltwater spills at E and P sites

    International Nuclear Information System (INIS)

    Carty, D.J.

    1995-01-01

    At exploration and production (E and P) sites crude spills restricted to topsoil are often self-remediating, but salt spills rarely are. Most soils naturally biodegrade crude. Without appropriate human intervention, brine spills can result in decades of barren land and seriously degrade surface water and aquifers. Servicing the E and P industry are remediation practitioners with a limited array of often expensive remediation concepts and materials which they hope will work, and sometimes do. Unfortunately, many remediation practitioners are unfamiliar with, or disregard, the natural physical, chemical, and biotic complexity of the soil and aquatic media. All too often this results in exacerbating injury to an already damaged ecosystem. Likewise, important cultural factors such as public relations, environmental regulations, property rights, and water rights are also overlooked until after implementation of an ill-advised or illegal remediation design has been initiated. A major issue is determining what constitutes ''successful'' remediation of a brine spill. Environmental managers have long sought one or two universally applicable fast and cheap amendment/treatment protocols for all their diverse multi-state salt affected spill scenarios. This presentation describes aspects of common spill-affected ecosystems which must be considered to achieve ''successful'' remediation

  7. On site remediation of a fuel spill and soil reuse in Antarctica.

    Science.gov (United States)

    McWatters, R S; Wilkins, D; Spedding, T; Hince, G; Raymond, B; Lagerewskij, G; Terry, D; Wise, L; Snape, I

    2016-11-15

    The first large-scale remediation of fuel contamination in Antarctica treated 10000L of diesel dispersed in 1700t of soil, and demonstrated the efficacy of on-site bioremediation. The project progressed through initial site assessment and natural attenuation, passive groundwater management, then active remediation and the managed reuse of soil. Monitoring natural attenuation for the first 12years showed contaminant levels in surface soil remained elevated, averaging 5000mg/kg. By contrast, in five years of active remediation (excavation and biopile treatment) contaminant levels decreased by a factor of four. Chemical indicators showed hydrocarbon loss was apportioned to both biodegradation and evaporative processes. Hydrocarbon degradation rates were assessed against biopile soil temperatures, showing a phase of rapid degradation (first 100days above soil temperature threshold of 0°C) followed by slower degradation (beyond 100days above threshold). The biopiles operated successfully within constraints typical of harsh climates and remote sites, including limitations on resources, no external energy inputs and short field seasons. Non-native microorganisms (e.g. inoculations) and other organic materials (e.g. bulking agents) are prohibited in Antarctica making this cold region more challenging for remediation than the Arctic. Biopile operations included an initial fertiliser application, biannual mechanical turning of the soil and minimal leachate recirculation. The biopiles are a practical approach to remediate large quantities of contaminated soil in the Antarctic and already 370t have been reused in a building foundation. The findings presented demonstrate that bioremediation is a viable strategy for Antarctica and other cold regions. Operators can potentially use the modelled relationship between days above 0°C (threshold temperature) and the change in degradation rates to estimate how long it would take to remediate other sites using the biopile technology

  8. In-situ bioremediation at the French Limited Site

    International Nuclear Information System (INIS)

    Woodward, R.; Ramsden, D.

    1990-01-01

    In situ biodegradation of petrochemical wastes at the French Limited Superfund Site was stimulated by providing the appropriate pH, essential nutrients, oxygen, and substrate availability. Fourteen wastewater treatment parameters, plus toxicity, were monitored to document the program of bioremediation. Periodic, organic priority pollutant analysis of mixed liquor, settled sludges and subsoils provided data for kinetics interpretation and half life calculation. The half lives of thirteen PAH compounds ranged from 27 to 46 days, in contrast to the degradation rate, in months, reported for these compounds in LTUs. An ambitious air monitoring program measured fugitive emissions at lagoon side, fenceline, and from the lagoon surface by floating flux chamber. The amount of volatiles lost never exceeded 1/2 of the OSHA 8 hr TLV and it could be readily managed by adjusting the intensity and frequency of mixing and aeration. The demonstration confirmed the feasibility of in situ bioremediation and led to one of the first US EPA Record of Decisions to use bioremediation for cleanup of a large Superfund site. A consent Decree outlining the site remedial action program was signed by the PRP task group and published in the Federal Register. This represents a landmark project for in situ bioremediation and has established precedence for use of this technology at CERCLA and RCRA sites nationwide

  9. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Levine, M.B.

    1990-01-01

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab

  10. Superfund record of decision (EPA Region 4): Potter's septic tank service pits site, Brunswick County, Sandy Creek, NC. (First remedial action), August 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 5-acre Potter's Septic Tank Service Pits (Potter's Pits) is located in a rural section of Brunswick County, North Carolina. The site is situated within a residential community known as the Town of Sandy Creek. Disposal practices consisted of placing petroleum waste products and septic tank sludges either in shallow unlined pits or directly on the land surface. The ROD addresses the ground water treatment and contaminated soils at the site. Primary contaminants of concern affecting surface and subsurface soil are VOCs and semi-VOCs, including napthalene, metals, and pesticides. Ground water is contaminated with VOCs, including benzene, ethyl benzene, toluene; other organics including naphthalene, and xylenes; and metals, including chromium and lead. The selected remedial action for the site includes excavating all soils that exceed the soil clean-up standards; treating contaminated soils by using an onsite ex-situ thermal desorption process; performing secondary treatment of the concentrated organic contaminants, and sampling and analyzing the treatment residue

  11. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    International Nuclear Information System (INIS)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764

  12. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P. T.; Webb, J. R.; Knox, N. P.; Goins, L. F.; Harrell, R. E.; Mallory, P. K.; Cravens, C. D.

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  13. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation

  14. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.

  15. DOJ News Release: New York Man Ordered to Pay Over $400,000 in Restitution and Fines for Role in Kickback Scheme at New Jersey Superfund Sites

    Science.gov (United States)

    WASHINGTON, D.C. – An Amherst, New York, man was ordered to pay over $400,000 in restitution and fines and placed on five years’ probation for his role in a kickback scheme at the Federal Creosote and Diamond Alkali Superfund sites in New Jersey.

  16. Effect of Remediation Parameters on in-Air Ambient Dose Equivalent Rates When Remediating Open Sites with Radiocesium-contaminated Soil.

    Science.gov (United States)

    Malins, Alex; Kurikami, Hiroshi; Kitamura, Akihiro; Machida, Masahiko

    2016-10-01

    Calculations are reported for ambient dose equivalent rates [H˙*(10)] at 1 m height above the ground surface before and after remediating radiocesium-contaminated soil at wide and open sites. The results establish how the change in H˙*(10) upon remediation depends on the initial depth distribution of radiocesium within the ground, on the size of the remediated area, and on the mass per unit area of remediated soil. The remediation strategies considered were topsoil removal (with and without recovering with a clean soil layer), interchanging a topsoil layer with a subsoil layer, and in situ mixing of the topsoil. The results show the ratio of the radiocesium components of H˙*(10) post-remediation relative to their initial values (residual dose factors). It is possible to use the residual dose factors to gauge absolute changes in H˙*(10) upon remediation. The dependency of the residual dose factors on the number of years elapsed after fallout deposition is analyzed when remediation parameters remain fixed and radiocesium undergoes typical downward migration within the soil column.

  17. Remediation of radioactively contaminated facilities and the site of Russian Research Center Kurchatov Institute

    International Nuclear Information System (INIS)

    Velikhov, E.P.; Ponomarev-Stepnoj, N.N.; Volkov, V.G.

    2007-01-01

    One discusses the efforts to rehabilitate the radiation hazard installations and to remediate the contaminated territory of the Kurchatov Institute RSC undertaken in 2006-2007 in terms of the Remediation Project. The old radwaste storage facilities constructed at the site when the Institute was involved in activities to elaborate both war and civil nuclear technologies were the basic objects of the rehabilitation efforts. Paper describes the structure of the storage facilities covering the volume and the characteristics of the stored radwaste. Paper discusses the storage facility site layout parameters taken into consideration in the course of the remediation efforts. Paper describes the procedures, the sequence of the remediation efforts and the peculiar features of the planning and engineering approaches. Paper dwells upon the results of the rehabilitation and the remediation efforts [ru

  18. Superfund record of decision (EPA Region 3): Paoli Rail Yard, Paoli, PA. (First remedial action), July 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 428-acre Paoli Rail Yard site is a maintenance, storage, and repair facility located north of Paoli in Chester County, Pennsylvania. Soil contamination in and around the car shop is attributed to releases of fuel oil and PCB-laden transformer fluid from rail cars during maintenance and repair activities. In 1985, EPA identified PCB contamination in soil and sediment, and on building surfaces. The rail companies agreed to address site clean-up activities, including erosion, sedimentation, and stormwater characteristics and control, decontamination, soil sampling, excavation of 3,500 cubic yards residential soil, and implementation of worker protection measures. The ROD provides a final remedy for contaminated soil (from the rail yard and residences), sediment, and structures at the Paoli Rail Yard, and contaminated ground water. The primary contaminants of concern affecting the soil, sediment, debris, and ground water are VOCs, including benzene, ethylbenzene, toluene, xylenes; and other organics, including PCBs. The selected remedial action for the site are included

  19. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ''may affect'' the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA)

  20. [Urban industrial contaminated sites: a new issue in the field of environmental remediation in China].

    Science.gov (United States)

    Liao, Xiao-Yong; Chong, Zhong-Yi; Yan, Xiu-Lan; Zhao, Dan

    2011-03-01

    Contamination of urban industrial lands is a new environmental problem in China during the process of upgrade of industrial structure and adjustment of urban layout. It restricts the safe re-use of urban land resources, and threatens the health of surrounding inhabitants. In the paper, the market potential of contaminated-site remediation was known through analysis of spatial distribution of urban industrial sites in China. Remediation technologies in the Occident which were suitable for urban industrial contaminated sites were discussed and compared to evaluate their superiority and inferiority. And then, some advices of remediation technologies for urban industrial contaminated sites in China were proposed.

  1. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    International Nuclear Information System (INIS)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word

  3. Options Evaluation for Remediation of the Gunnar Site Using a Decision- Tree Approach

    Energy Technology Data Exchange (ETDEWEB)

    Yankovich, Tamara L. [International Atomic Energy Agency, P.O. Box 100, 1400 Vienna (Austria); Hachkowski, Andrea [CH2M Hill Canada Limited, 1305 Kenaston Blvd, Winnipeg, Manitoba, R3P 2P2 (Canada); Klyashtorin, Alexey [Saskatchewan Research Council, 15 Innovation Blvd no.125, Saskatoon, Saskatchewan, S7N 2X8 (Canada)

    2014-07-01

    Current best practice in the nuclear industry involves proactive planning of activities from cradle-to-grave over the entire nuclear life cycle in accordance with national requirements and international guidance. This includes the development of detailed decommissioning plans (DDP) at an early stage to facilitate proactive, responsible decision-making as activities are being planned. It should be noted, however, that the current approach may not be applicable to historic nuclear legacy sites, such as abandoned uranium mines and mills, which had operated in the past under less stringent regulatory regimes. In such cases, records documenting past activities are often not available and monitoring data may not have been collected, thereby limiting knowledge of impacts related to past activities. This can lead to challenges in gaining regulatory and funding approvals related to the remediation of such sites, especially given the costs that can be associated with remediation and the uncertainties in characterizing the existing situation. The Gunnar Site, in northern Saskatchewan, is an example of an abandoned uranium mine/mill site, which was operated between the late 1950's to early 1960's under a different regulatory regime than today. Due to the lack of monitoring data and records for the site, and the corresponding uncertainties, a number of precedent-setting approaches have been developed and applied, as part of the environmental impact assessment (EIA) process. Specifically, unlike traditional environmental assessments for planned and operating facilities, it was not possible to identify a preferred and alternative remedial option. Instead, a step-wise decision-tree approach has been developed to identify all potentially feasible remedial options and to map out key decision points, during the licensing phase of the project (following approval of the environmental assessment), when final remedial options will be selected. The presentation will provide

  4. Environmental audit of the Maywood Site: Formerly Utilized Sites Remedial Action Program, Maywood Interim Storage Site vicinity properties

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This report presents the results of the Environmental Audit of the Maywood Site managed by the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Audit was carried out from November 7 through 16, 1990. The Audit Team found overall technical competence and knowledge of management and staff to be excellent. This applies to DOE as well as to Bechtel National, Incorporated (BNI). In particular, there was excellent knowledge of federal, state, and local environmental regulations, as well as analysis for applicability of these regulations to FUSRAP. Project management of the Maywood Site is also excellent. BNI and DOE project staff have made frequent contact with members of the community, and all removal actions and remedial investigation activities have been planned, scheduled, and accomplished with competence and attention to total quality principles. To date, all actions taken for the Maywood Site cleanup have been completed ahead of schedule and on or under budget. Weakness noted include self-assessment efforts by DOE, failure to fully implement DOE Order requirements throughout the program, and some discrepancies in formally documenting and reviewing procedures. 7 figs., 10 tabs.

  5. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  6. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  7. TREATABILITY STUDY REPORT OF GREEN MOUNTAIN LABORATORIES, INC.'S BIOREMEDIATION PROCESS, TREATMENT OF PCB CONTAMINATED SOILS, AT BEEDE WASTE OIL/CASH ENERGY SUPERFUND SITE, PLAISTOW, NEW HAMPSHIRE

    Science.gov (United States)

    In 1998, Green Mountain Laboratories, Inc. (GML) and the USEPA agreed to carry out a Superfund Innovative Technology Evaluation (SITE) project to evaluate the effectiveness of GML's Bioremediation Process for the treatment of PCB contaminated soils at the Beede Waste Oil/Cash Ene...

  8. Technology evaluation report: Biotrol Soil Washing System for treatment of a wood-preserving site. Volume 2, Part B

    International Nuclear Information System (INIS)

    Skovronek, H.S.; Ellis, W.; Evans, J.; Kitaplioglu, O.; McPherson, J.

    1991-12-01

    The SITE Program demonstration of one configuration of the BioTrol Soil Washing System (BSWS) was conducted to obtain reliable performance and cost data that can be used to evaluate the potential applicability of the technology as a remediation alternative for sites contaminated with hazardous wastes. The BSWS treatment train used in the study consists of three technologies: a soil washer; an aqueous treatment system; and a slurry bio-reactor. The demonstration was carried out at the MacGillis and Gibbs Superfund site in New Brighton, MN. The report analyzes the results from the SITE demonstration. It includes discussion of the operation of the three separate treatment technologies (SW, SBR, and BATS) evaluated in the test and provides flow diagrams, a summary of the sampling and analytical programs, an economic analysis, and a quality assurance/quality control evaluation of the data. Conclusions were reached concerning the technology's suitability for use in remediations involving both similar and different materials at other sites

  9. Site clean-up requirements: where does one dispose of dirt?

    International Nuclear Information System (INIS)

    Feldman, J.

    1986-01-01

    Under its Superfund program the US Environmental Protection Agency (EPA) has committed itself to remediate certain residential and commercial properties impacted by an accumulation of indoor radon or thoron resulting from deposition of contaminated dirt. A case in point: The State of New Jersey now has a number of sites contaminated with the residues of radium or thorium extraction operations. The residues (dirt) were removed from the original operations areas and used as landfill, often in locations which are now around houses or other buildings. EPA's soil contamination limits for radium or thorium dictate that remediation efforts consist of removal of that fill. This solution presents the problem of disposing of large volumes of marginally radioactive materials. Options which recognize the present lack of low-level radioactive waste disposal facilities are examined here

  10. Natural bioventing remediation from tidal wave action at a field site

    International Nuclear Information System (INIS)

    Kampbell, D.H.; Kittel, J.A.

    1996-01-01

    A remediation research study has been implemented at a jet fuel spill site on an island airport. A buried pipeline fracture several years ago resulted in a fuel spill exceeding 160,000 gallons. The site hydrogeology is a fragmented coral matrix with fresh water overlying more dense salt water. Water table fluctuations of about two feet occur once every twelve hours from tidal action. The research approach being pursued is to recover free-phase floating petroleum liquid using vacuum-mediated subsurface skimming wells. The vacuum will create an active vadose zone aeration to enhance aerobic biodegradation processes and vaporization of fuel. Once the floating fuel is removed, a natural bioventing action caused by tidal oscillations will complete remediation of the spill site

  11. Final record of decision for remedial actions at Operable Unit 4

    International Nuclear Information System (INIS)

    1994-12-01

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. This remedial action was selected in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the extent practicable 40 Code of Federal Regulations (CFR) Part 300, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). For Operable Unit 4 at the FEMP, DOE has chosen to complete an integrated CERCLA/NEPA process. This decision was based on the longstanding interest on the part of local stakeholders to prepare an Environmental Impact Statement (EIS) on the restoration activities at the FEMP and on the recognition that the draft document was issued and public comments received. Therefore, this single document is intended to serve as DOE's Record of Decision (ROD) for Operable Unit 4 under both CERCLA and NEPA; however, it is not the intent of the DOE to make a statement on the legal applicability of NEPA to CERCLA actions

  12. Time series geophysical monitoring of permanganate injections and in situ chemical oxidation of PCE, OU1 area, Savage Superfund Site, Milford, NH, USA

    Science.gov (United States)

    Harte, Philip T.; Smith, Thor E.; Williams, John H.; Degnan, James R.

    2012-01-01

    In situ chemical oxidation (ISCO) treatment with sodium permanganate, an electrically conductive oxidant, provides a strong electrical signal for tracking of injectate transport using time series geophysical surveys including direct current (DC) resistivity and electromagnetic (EM) methods. Effective remediation is dependent upon placing the oxidant in close contact with the contaminated aquifer. Therefore, monitoring tools that provide enhanced tracking capability of the injectate offer considerable benefit to guide subsequent ISCO injections. Time-series geophysical surveys were performed at a superfund site in New Hampshire, USA over a one-year period to identify temporal changes in the bulk electrical conductivity of a tetrachloroethylene (PCE; also called tetrachloroethene) contaminated, glacially deposited aquifer due to the injection of sodium permanganate. The ISCO treatment involved a series of pulse injections of sodium permanganate from multiple injection wells within a contained area of the aquifer. After the initial injection, the permanganate was allowed to disperse under ambient groundwater velocities. Time series geophysical surveys identified the downward sinking and pooling of the sodium permanganate atop of the underlying till or bedrock surface caused by density-driven flow, and the limited horizontal spread of the sodium permanganate in the shallow parts of the aquifer during this injection period. When coupled with conventional monitoring, the surveys allowed for an assessment of ISCO treatment effectiveness in targeting the PCE plume and helped target areas for subsequent treatment.

  13. Radiological guidelines for application to DOE's Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1983-03-01

    The US Department of Energy has implemented a program to evaluate and, where necessary, take action to protect the public from contamination at sites that were used in the past to process and/or store radioactive materials for the former US Army Corps of Engineers Manhattan Engineer District or the US Atomic Energy Commission. The program is identified as the Formerly Utilized Sites Remedial Action Program (FUSRAP). This document describes methods considered appropriate for the evaluation of health effects that might possible be caused by radioactive contamination at FUSRAP sites. This assessment methodology is applied to a typical site for the purposeof deriving guidelines for the cleanup of contaminated soil. Additional guidance is provided for planning site-specific remedial action that is consistent with the overall objectives of FUSRAP

  14. Safety analysis and hazard classification for the 100-B/C Site Remediation Project, Phase 1. Revision 1

    International Nuclear Information System (INIS)

    Adam, W.J.; Lehrschall, R.R.; Oestreich, D.K.

    1996-07-01

    The purpose of this report is to document the preliminary hazard classification (PHC) for the initial group of sites to be remediated by the 100-B/C Site Remediation Project. The project is targeted at excavation of contaminated solid from seven waste sites, and the transportation and disposal of these wastes at the Environmental Restoration Disposal Facility. The PHC for these remediation activities is rated as radiological

  15. Raman spectroscopy of efflorescent sulfate salts from Iron Mountain Mine Superfund Site, California

    Science.gov (United States)

    Sobron, Pablo; Alpers, Charles N.

    2013-01-01

    The Iron Mountain Mine Superfund Site near Redding, California, is a massive sulfide ore deposit that was mined for iron, silver, gold, copper, zinc, and pyrite intermittently for nearly 100 years. As a result, both water and air reached the sulfide deposits deep within the mountain, producing acid mine drainage consisting of sulfuric acid and heavy metals from the ore. Particularly, the drainage water from the Richmond Mine at Iron Mountain is among the most acidic waters naturally found on Earth. The mineralogy at Iron Mountain can serve as a proxy for understanding sulfate formation on Mars. Selected sulfate efflorescent salts from Iron Mountain, formed from extremely acidic waters via drainage from sulfide mining, have been characterized by means of Raman spectroscopy. Gypsum, ferricopiapite, copiapite, melanterite, coquimbite, and voltaite are found within the samples. This work has implications for Mars mineralogical and geochemical investigations as well as for terrestrial environmental investigations related to acid mine drainage contamination.

  16. Raman spectroscopy of efflorescent sulfate salts from Iron Mountain Mine Superfund Site, California.

    Science.gov (United States)

    Sobron, Pablo; Alpers, Charles N

    2013-03-01

    The Iron Mountain Mine Superfund Site near Redding, California, is a massive sulfide ore deposit that was mined for iron, silver, gold, copper, zinc, and pyrite intermittently for nearly 100 years. As a result, both water and air reached the sulfide deposits deep within the mountain, producing acid mine drainage consisting of sulfuric acid and heavy metals from the ore. Particularly, the drainage water from the Richmond Mine at Iron Mountain is among the most acidic waters naturally found on Earth. The mineralogy at Iron Mountain can serve as a proxy for understanding sulfate formation on Mars. Selected sulfate efflorescent salts from Iron Mountain, formed from extremely acidic waters via drainage from sulfide mining, have been characterized by means of Raman spectroscopy. Gypsum, ferricopiapite, copiapite, melanterite, coquimbite, and voltaite are found within the samples. This work has implications for Mars mineralogical and geochemical investigations as well as for terrestrial environmental investigations related to acid mine drainage contamination.

  17. Radiological audit of remedial action activities at the processing site, transfer site, and Cheney disposal site Grand Junction, Colorado: Audit date, August 9--11, 1993

    International Nuclear Information System (INIS)

    1993-08-01

    The Uranium Mill Tailing Remedial Action (UMTRA) Project's Technical Assistance Contractor (TAC) performed a radiological audit of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site, transfer site, and Cheney disposal site in Grand Junction, Colorado. Jim Hylko and Bill James of the TAC conducted this audit August 9 through 11, 1993. Bob Cornish and Frank Bosiljevec represented the US Department of Energy (DOE). This report presents one programmatic finding, eleven site-specific observations, one good practice, and four programmatic observations

  18. What's the point? The contribution of a sustainability view in contaminated site remediation.

    Science.gov (United States)

    Anderson, Robert; Norrman, Jenny; Back, Pär-Erik; Söderqvist, Tore; Rosén, Lars

    2018-07-15

    Decision support tools (DST) are often used in remediation projects to aid in the complex decision on how best to remediate a contaminated site. In recent years, the sustainable remediation concept has brought increased attention to the often-overlooked contradictory effects of site remediation, with a number of sustainability assessment tools now available. The aim of the present study is twofold: (1) to demonstrate how and when different assessment views affect the decision support outcome on remediation alternatives in a DST, and (2) to demonstrate the contribution of a full sustainability assessment. The SCORE tool was used in the analysis; it is based on a holistic multi-criteria decision analysis (MCDA) approach, assessing sustainability in three dimensions: environmental, social, and economic. Four assessment scenarios, compared to a full sustainability assessment, were considered to reflect different possible assessment views; considering public and private problem owner perspectives, as well as green and traditional assessment scopes. Four real case study sites in Sweden were analyzed. The results show that the decision support outcome from a full sustainability assessment most often differs to that of other assessment views, and results in remediation alternatives which balance trade-offs in most of the scenarios. In relation to the public perspective and traditional scope, which is seen to lead to the most extensive and expensive remediation alternatives, the trade-off is related to less contaminant removal in favour of reduced negative secondary effects such as emissions and waste disposal. Compared to the private perspective, associated with the lowest cost alternatives, the trade-off is higher costs, but more positive environmental and social effects. Generally, both the green and traditional assessment scopes miss out on relevant social and local environmental secondary effects which may ultimately be very important for the actual decision in a

  19. Estimating risk at a Superfund site contaminated with radiological and chemical wastes

    International Nuclear Information System (INIS)

    Temeshy, A.; Liedle, J.M.; Sims, L.M.; Efird, C.R.

    1992-01-01

    This paper describes the method and results for estimating carcinogenic and noncarcinogenic effects at a Superfund site that is radiologically and chemically contaminated. Risk to receptors from disposal of waste in soil and resulting contamination of groundwater, air, surface water, and sediment is quantified. Specific risk assessment components which are addressed are the exposure assessment, toxicity assessment, and the resulting risk characterization. In the exposure assessment, potential exposure pathways are identified using waste disposal inventory information for soil and modeled information for other media. Models are used to calculate future radionuclide concentrations in groundwater, soil, surface water and air. Chemical exposure concentrations are quantified using site characterization data. Models are used to determine concentrations of chemicals in surface water and in air. Toxicity parameters used to quantify the dose-response relationship associated with the carcinogenic contaminants are slope factors and with noncarcinogenic contaminants are reference doses. In the risk characterization step, results from the exposure assessment and toxicity assessment are summarized and integrated into quantitative risk estimates for carcinogens and hazard induces for noncarcinogens. Calculated risks for carcinogenic contaminants are compared with EPA's target risk range. At WAG 6, the risk from radionuclides and chemicals for an on-WAG homesteader exceeds EPA's target risk range. Hazard indices are compared to unity for noncarcinogenic contaminants. At WAG 6, the total pathway hazard index for the on-WAG homesteader exceeds unity

  20. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    International Nuclear Information System (INIS)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions

  1. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  2. Robust remediation strategies at gas-work sites: a case of source recognition and source characterization

    International Nuclear Information System (INIS)

    Vries, P.O. de

    2005-01-01

    In The Netherlands there have been gasworks at about 260 to 270 locations. Most of these locations are or were heavily polluted with tar, ashes and cyanides and many of them belong to the locations where remediation actions have already been executed. It seems however that many of them also belong to the locations where remediation actions were not quite as successful as was expected. So, for many gas-work sites that were already 'remedied' in the 80's and early 90's of the foregoing century, new programs for site remediation are planned. Of course the mistakes from the past should now be avoided. The current remediation strategy in The Netherlands for gas-work sites can be comprised in four steps: 1 - removing spots in the top soil, 2 - removing spots with mobile components in the shallow subsoil, 3 - controlling spots with mobile components in the deep subsoil, 4 - creating a 'steady endpoint situation' in the plume. At many former gas-work sites real sources, i.e. in a physico-chemical sense, are not very well known. This can easily lead to insufficient removal of some or part of these sources and cause a longer delivery of contaminants to the groundwater plume, with higher endpoint concentrations, higher costs and more restrictions for future use. The higher concentrations and longer deliveries originating from not recognized or not localized sources are often not sufficiently compensated by the proposed plume management in current remediation strategies. Remediation results can be improved by using knowledge about the processes that determine the delivery of contaminants to the groundwater, the materials that cause these delivery and the locations at the site where these are most likely found. When sources are present in the deep subsoil or the exact localization of sources is uncertain, robust remediation strategies should be chosen and wishful thinking about removing sources with in situ techniques should be avoided. Robust strategies are probably less

  3. Development of an integrated economic decision-support tool for the remediation of contaminated sites. Overview note

    International Nuclear Information System (INIS)

    Samson, R.; Bage, G.

    2004-05-01

    This report concludes the first design phase of an innovative software tool which, when completed, will allow managers of contaminated sites to make optimal decisions with respect to site remediation. The principal objective of the project was to develop the foundations for decision-support software (SITE VII) which will allow a comprehensive and rigorous approach to the comparison of remediation scenarios for sites contaminated with petroleum hydrocarbons. During this first phase of the project, the NSERC Industrial Chair in Site Remediation and Management of the Ecole Polytechnique de Montreal has completed four stages in the design of a decision-support tool that could be applied by any site manager using a simple computer. These four stages are: refinement of a technico-economic evaluation model; development of databases for five soil remediation technologies; design of a structure for integration of the databases with the technico-economic model; and simulation of the remediation of a contaminated site using the technico-economic model and a subset of the databases. In the interim report, the emphasis was placed on the development of the technico-economic model, supported by a very simple, single-technology simulation of remediation. In the present report, the priority is placed on the integration of the different components required for the creation of decision-support software based on the technico-economic model. An entire chapter of this report is devoted to elaborating the decision structure of the software. The treatment of information within the software is shown schematically and explained step-by-step. Five remediation technologies are handled by the software: three in-situ technologies (bio-venting, bio-slurping, bio-sparging) and two ex-situ technologies (thermal desorption, Bio-pile treatment). A technology file has been created for each technology, containing a brief description of the technology, its performance, its criteria of applicability

  4. Superfund Record of Decision (EPA Region 7): Weldon Spring Quarry/Plant/Pits (USDOE), Weldon Spring, MO. (Second remedial action), September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The 226-acre Weldon Spring Quarry/Plant/Pits (USDOE) site is a former ordnance works and chemical plant near the city of Weldon Spring in St. Charles County, Missouri. The site is divided into two noncontiguous areas: a 217-acre chemical plant area, comprised of various buildings, ponds and four raffinate pits, and a 9-acre quarry, which forms a valley wall at the edge of the Missouri River floodplain. Since the early 1940s, the site has been used by various government agencies for chemical and ordnance processing with chemical and radioactive waste disposal in the quarry. From 1941 to 1946, the site was an Army ordnance works used for the production of trinitrotoluene (TNT) and dinitrotoluene (DNT) explosives. The selected interim remedial action for the site includes excavating an estimated 95,000 cubic yards of chemically and radioactively contaminated bulk wastes from the quarry and temporarily storing the wastes onsite in the chemical plant area; and implementing site access restrictions. The estimated total cost for the remedial action is $11,000,000

  5. Challenges in Obtaining Property Access: The FUSRAP Maywood Site Experience - 13433

    International Nuclear Information System (INIS)

    Kollar, William

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the US government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. Many of these sites are not owned by the federal government and therefore require owner permission to enter. The experience in pursuing such access at the FUSRAP Maywood Superfund Site (the Maywood Site or the Site) in Bergen County, New Jersey, is extensive. Since the US Army Corps of Engineers (the Corps) assumed responsibility for the Maywood Site from the US Department of Energy in 1997, at least 186 separate property access agreements (known in FUSRAP as a Real Estate Right-of- Entry or ROE) have been executed between the Corps and approximately 55 different land owners and tenant occupants at the Maywood Site (agreement renewals with the same owners over time account for the difference). Maywood's experience during the Corps' tenure, reflected here in three case studies of representative property access efforts, offers some lessons and best practices that may apply to other remedial programs. While the Site Community Relations Manager (the author of this paper) managed the property access task, multi-disciplinary support from across the project was also critical to success in this endeavor. (authors)

  6. Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs

  7. Current activities handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified

  8. Current activities handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-27

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

  9. Determining site-specific background level with geostatistics for remediation of heavy metals in neighborhood soils

    Directory of Open Access Journals (Sweden)

    Tammy M. Milillo

    2017-03-01

    Full Text Available The choice of a relevant, uncontaminated site for the determination of site-specific background concentrations for pollutants is critical for planning remediation of a contaminated site. The guidelines used to arrive at concentration levels vary from state to state, complicating this process. The residential neighborhood of Hickory Woods in Buffalo, NY is an area where heavy metal concentrations and spatial distributions were measured to plan remediation. A novel geostatistics based decision making framework that relies on maps generated from indicator kriging (IK and indicator co-kriging (ICK of samples from the contaminated site itself is shown to be a viable alternative to the traditional method of choosing a reference site for remediation planning. GIS based IK and ICK, and map based analysis are performed on lead and arsenic surface and subsurface datasets to determine site-specific background concentration levels were determined to be 50 μg/g for lead and 10 μg/g for arsenic. With these results, a remediation plan was proposed which identified regions of interest and maps were created to effectively communicate the results to the environmental agencies, residents and other interested parties.

  10. Summary report of Hanford Site well remediation and decommissioning activities for fiscal year 1994

    International Nuclear Information System (INIS)

    Reynolds, K.D.

    1994-01-01

    Remediation and decommissioning of Hanford Site wells has become an integral part of Hanford Site Environmental Restoration (ER) and Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring programs. A well remediation and decommissioning program was funded and implemented in fiscal year (FY) 1993 under the RCRA and Operational Monitoring (ROM) Program. Funding for this work increased in FY 1994. In FY 1994 well decommissioning activities conducted for the ROM program were centered around the 200 West Area; activities for the ER program were centered in the Fitzner/Eberhart Arid Land Ecology (ALE) (Reserve) unit and the Wahluke Slope (North Slope) area. A total of 116 wells and test borings were decommissioned between the two programs during FY 1994. Additionally, five wells were identified as in need of remediation and were successfully brought into compliance with regulatory requirements. As Hanford Site restoration and remediation efforts increase in scope, the well decommissioning program will remain dynamic. The program will aggressively seek to fulfill the needs of the various environmental cleanup and groundwater/vadose monitoring programs. Wells that do not meet regulatory requirements for preservation will continually be identified and remediated or decommissioned accordingly

  11. A multidisciplinary approach to site remediation and management in a bedrock environment

    Energy Technology Data Exchange (ETDEWEB)

    Millard, G. [Shell Canada Ltd., Calgary, AB (Canada); Micklethwaite, R.; Digel, S.; Lyons, E. [O' Connor Associates Environmental Inc., Calgary, AB (Canada)

    2006-07-01

    A multidisciplinary approach to site remediation and management in a bedrock environment was presented. This presentation provided a description of the site which was a former service station from 1985 to 2003 in Calgary. Illustrations of the subject site and stratigraphic section were presented along with initial environmental conditions. The project objectives included: managing the site so that a tenant could re-develop and occupy the site; minimizing management costs until long-term, remediation could be achieved; and, developing and implementing a plan to assess, mitigate, and manage the risk in a manner accepted by Alberta Environment and the City of Calgary. The presentation also addressed issues regarding a risk-assessment, high vacuum extraction system, and refining HVE operations. The regulatory, business and ancillary outcomes of the risk assessment were also outlined. Last, the presentation identified how the results were achieved. tabs., figs.

  12. Soil remediation of a former power plant site in Tulita, Northwest Territories

    International Nuclear Information System (INIS)

    Pouliot, Y.; Thomassin-Lacroix, E.; Moreau, N.

    2005-01-01

    This paper outlines major stages of an ongoing remediation project caused by a power generating plant in the Dene Hamlet of Tulita. High levels of soil contamination were caused by the plant's operations as well as accidental petroleum hydrocarbon (PHC) spills. The decommissioning of the plant required that the site be remediated. Challenges faced by the remediators included the high level of contamination, the remote location of the community, as well as the fact that the site was located in the centre of the community. In addition, the soil in the impacted site was fine, and a 20 cm thick layer of peat acted as sponge, absorbing and trapping hydrocarbons. Remedial criteria was outlined according to Canada-Wide Standards for fine-grained soil in an industrial setting. The technology used for the project was Biopile, a process consisting of installing wells in the contaminated zone in order to provide the aeration required for PHC biodegradation and to condition the soil on a regular basis in order to promote optimal treatment conditions throughout the impacted material. Results indicated that the first 2 months were successful in reducing initial PHC levels. However, the following treatment season did not show as much degradation. An investigation revealed that nitrogen and phosphorus levels were insufficient to sustain microbial activity, as a result of lower than normal temperatures in the area for that season. Nutrients were added to the soil to re-establish the appropriate treatment conditions. It was concluded that the technology used presented numerous advantages. Overall disturbance of the area was reduced, and allowed other measures to be implemented, including segregation of the highly impacted peat layer. It was expected that remediation objectives for the entire site will be met by July 2005. 3 refs., 3 tabs

  13. Soil remediation of a former power plant site in Tulita, Northwest Territories

    Energy Technology Data Exchange (ETDEWEB)

    Pouliot, Y.; Thomassin-Lacroix, E. [Biogenie Inc., Lachenaie, PQ (Canada); Moreau, N. [Biogenie, Quebec City, PQ (Canada)

    2005-07-01

    This paper outlines major stages of an ongoing remediation project caused by a power generating plant in the Dene Hamlet of Tulita. High levels of soil contamination were caused by the plant's operations as well as accidental petroleum hydrocarbon (PHC) spills. The decommissioning of the plant required that the site be remediated. Challenges faced by the remediators included the high level of contamination, the remote location of the community, as well as the fact that the site was located in the centre of the community. In addition, the soil in the impacted site was fine, and a 20 cm thick layer of peat acted as sponge, absorbing and trapping hydrocarbons. Remedial criteria was outlined according to Canada-Wide Standards for fine-grained soil in an industrial setting. The technology used for the project was Biopile, a process consisting of installing wells in the contaminated zone in order to provide the aeration required for PHC biodegradation and to condition the soil on a regular basis in order to promote optimal treatment conditions throughout the impacted material. Results indicated that the first 2 months were successful in reducing initial PHC levels. However, the following treatment season did not show as much degradation. An investigation revealed that nitrogen and phosphorus levels were insufficient to sustain microbial activity, as a result of lower than normal temperatures in the area for that season. Nutrients were added to the soil to re-establish the appropriate treatment conditions. It was concluded that the technology used presented numerous advantages. Overall disturbance of the area was reduced, and allowed other measures to be implemented, including segregation of the highly impacted peat layer. It was expected that remediation objectives for the entire site will be met by July 2005. 3 refs., 3 tabs.

  14. Concentration and trend of 1,4-dioxane in wells sampled during 2002–2017 in the vicinity of the Tucson International Airport Area Superfund Site, Arizona

    Science.gov (United States)

    Tillman, Fred D.

    2017-09-25

    Industrial activities causing extensive groundwater contamination led to the listing of the Tucson International Airport Area (TIAA) as a Superfund Site in 1983. Early groundwater investigations identified volatile organic compounds (VOCs), including the chlorinated solvents trichloroethylene (TCE) and perchloroethylene (PCE), in wells in the area. Several responsible parties were identified and cleanup activities began in the late 1980s. In 2002, the compound 1,4-dioxane was discovered in wells in the area and has since been detected in measurable concentrations throughout the site. The U.S. Environmental Protection Agency (USEPA) classifies 1,4-dioxane as a likely human carcinogen.The purpose of this map is to present 1,4-dioxane concentrations in wells sampled from 2002 through mid-2017 in the TIAA Superfund Site area to indicate both the current status and trends in 1,4-dioxane groundwater contamination. This map includes data from wells in the commercial and residential community in the TIAA and does not include data from wells in suspected or confirmed source areas, such as Air Force Plant 44 and Tucson International Airport, or from wells within treatment facilities.

  15. Superfund Query

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Superfund Query allows users to retrieve data from the Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) database.

  16. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  17. Superfund Record of Decision (EPA Region 9): North Hollywood/Burbank Well Field Area 1, San Fernando Valley Site, California (first remedial action), September 1987. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-24

    The North Hollywood - Burbank Well Field (NHBWF) is located within the San Fernando Valley Ground Water basin, which can provide drinking water for approximately 500,000 people residing in the San Fernando Valley and Los Angeles. In 1980 TCE and PCE were discovered in 25% of DWP's wells. In July 1981, DWP and the Southern California Association of Governments began a two-year study funded by EPA. The study revealed the occurrence of ground-water contamination plume patterns that are spreading toward the southeast. The primary contaminant of concern to the ground-water is TCE with PCE and other VOCs present. The selected remedial action for the site is ground-water pump and treatment using aeration and granular-activated-carbon - air-filtering units, with discharge to the DWP Pumping Station for chlorination and distribution. Spent carbon will be removed and replaced with fresh carbon, with the spent carbon scheduled either for disposal or regeneration. The estimated capital cost for this remedial action is $2,192,895 with present worth OandM of $2,284,105.

  18. Development of a sitewide groundwater remediation strategy at the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Goswami, D.

    1996-01-01

    Over 440 km 2 (170 mi 2 ) of groundwater beneath the Hanford Site are contaminated by hazardous and radioactive waste, out of which almost half is over state and federal drinking water standards. In addition to the complicated nature of these plumes, remediation is further obscured by limited application of available technologies and hydrogeologic information. This paper briefly describes the processes used by the Washington State Department of Ecology (Ecology), U.S. Environmental Protection Agency, and U.S. Department of Energy (USDOE) in developing a sitewide groundwater remediation strategy for Hanford and its outcome. As an initial approach to sitewide groundwater remediation, the strategy is to remediate the major plumes found in the reactor areas (100 Area) adjacent to the Columbia River and contain the major plumes found in the Central Plateau region (200 Area). This approach was based mainly on the qualitative risk, stakeholder's and tribe's values, and available technical feasibility. The strategy emphasizes the use of existing treatment and extraction technology for the remediation of groundwater in combination with proposed and existing site infrastructure. This work is being performed in parallel with ongoing risk and other feasibility activities. Under this strategy, innovative technologies being developed are in the areas of dense nonaqueous phase liquid identification and recovery, and problems associated with strontium-90, cesium-137, and plutonium in the vadose zone and groundwater. The final remediation strategy alternatives remain a product of risk assessment, technical feasibility, site use scenario, and cost consideration. In order to develop a strategy for the final cleanup, several issues such as aquifer restoration, natural attenuation, potential contamination of groundwater from the tank farms and from the existing contamination source in the vadose zone must be looked in detail in conjuction with public and stakeholder's values

  19. Guidance: Strategies to Achieve Timely Settlement and Implementation of RD/RA at Superfund Sites

    Science.gov (United States)

    Memorandum recommends strategies to encourage PRPs to enter into a settlement using the model RD/RA Consent Decree; discusses the current model UAO; and suggests practical alternatives to expedite Superfund settlements and the cleanup process.

  20. Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York

    International Nuclear Information System (INIS)

    1990-06-01

    This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs

  1. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  2. Nuclear Site Remediation and Restoration during Decommissioning of Nuclear Installations. A Report by the NEA Co-operative Programme on Decommissioning

    International Nuclear Information System (INIS)

    Orr, Peter; Mitchell, Nick; Mobbs, Shelly; Bennest, Terry; Abu-Eid, Rateb-Boby; Berton, Marie-Anne; Dehaye, Catherine Ollivier; Pellenz, Gilles; Cruikshank, Julian; Diaz Arocas, Paloma; Garcia Tapias, Ester; Hess, Norbert; Hong, Sam-Bung; Miller, Susan; Monken-Fernandes, Horst; ); Morse, John; Nitzsche, Olaf; Ooms, Bart; Osimani, Celso; Stuart Walker

    2014-01-01

    Decommissioning of nuclear facilities and related remedial actions are currently being undertaken around the world to enable sites or parts of sites to be reused for other purposes. Remediation has generally been considered as the last step in a sequence of decommissioning steps, but the values of prevention, long-term planning and parallel remediation are increasingly being recognised as important steps in the process. This report, prepared by the Task Group on Nuclear Site Restoration of the NEA Co-operative Programme on Decommissioning, highlights lessons learnt from remediation experiences of NEA member countries that may be particularly helpful to practitioners of nuclear site remediation, regulators and site operators. It provides observations and recommendations to consider in the development of strategies and plans for efficient nuclear site remediation that ensures protection of workers and the environment. (authors)

  3. Determining site-specific background level with geostatistics for remediation of heavy metals in neighborhood soils

    OpenAIRE

    Tammy M. Milillo; Gaurav Sinha; Joseph A. Gardella Jr.

    2017-01-01

    The choice of a relevant, uncontaminated site for the determination of site-specific background concentrations for pollutants is critical for planning remediation of a contaminated site. The guidelines used to arrive at concentration levels vary from state to state, complicating this process. The residential neighborhood of Hickory Woods in Buffalo, NY is an area where heavy metal concentrations and spatial distributions were measured to plan remediation. A novel geostatistics based decision ...

  4. Preliminary data report of investigations conducted at the Salmon Site, Lamar County, Mississippi

    International Nuclear Information System (INIS)

    1994-04-01

    The US Department of Energy (DOE) conducted ecological studies at the Salmon Site (SS), Lamar County, Mississippi, from the middle of June 1992 to the end of April 1993. The studies are part of the Remedial Investigation and Feasibility Study (RI/FS) being conducted by the DOE. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (CERCLA/SARA) for evaluating hazardous waste sites on the National Priorities List (NPL). The Salmon Site is not listed on the NPL but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA/SARA. As part of the remedial investigation, baseline human health and ecological risk assessments will be conducted. These baseline risk assessments will evaluate the potential impact on human health and the environment if remedial actions are not conducted, identify locations where additional information needs to be collected, help determine whether remedial actions are necessary, and provide justification for performing remedial actions. This report describes the sampling activities conducted between February and April 1993 to aid in evaluating the possible environmental impacts at the SS tailored to the specific circumstances and conditions found there. The initial investigations included identification of the flora and fauna in and around the SS, with particular emphasis on identifying sensitive environments, endangered species and their habitats, and those species consumed by humans or found in human food chains

  5. Statistical methods for evaluating the attainment of cleanup standards

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, R.O.; Simpson, J.C.

    1992-12-01

    This document is the third volume in a series of volumes sponsored by the US Environmental Protection Agency (EPA), Statistical Policy Branch, that provide statistical methods for evaluating the attainment of cleanup Standards at Superfund sites. Volume 1 (USEPA 1989a) provides sampling designs and tests for evaluating attainment of risk-based standards for soils and solid media. Volume 2 (USEPA 1992) provides designs and tests for evaluating attainment of risk-based standards for groundwater. The purpose of this third volume is to provide statistical procedures for designing sampling programs and conducting statistical tests to determine whether pollution parameters in remediated soils and solid media at Superfund sites attain site-specific reference-based standards. This.document is written for individuals who may not have extensive training or experience with statistical methods. The intended audience includes EPA regional remedial project managers, Superfund-site potentially responsible parties, state environmental protection agencies, and contractors for these groups.

  6. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  7. Applicability of petroleum horizontal drilling technology to hazardous waste site characterization and remediation

    International Nuclear Information System (INIS)

    Goranson, C.

    1992-09-01

    Horizontal wells have the potential to become an important tool for use in characterization, remediation and monitoring operations at hazardous waste disposal, chemical manufacturing, refining and other sites where subsurface pollution may develop from operations or spills. Subsurface pollution of groundwater aquifers can occur at these sites by leakage of surface disposal ponds, surface storage tanks, underground storage tanks (UST), subsurface pipelines or leakage from surface operations. Characterization and remediation of aquifers at or near these sites requires drilling operations that are typically shallow, less than 500-feet in depth. Due to the shallow nature of polluted aquifers, waste site subsurface geologic formations frequently consist of unconsolidated materials. Fractured, jointed and/or layered high compressive strength formations or compacted caliche type formations can also be encountered. Some formations are unsaturated and have pore spaces that are only partially filled with water. Completely saturated underpressured aquifers may be encountered in areas where the static ground water levels are well below the ground surface. Each of these subsurface conditions can complicate the drilling and completion of wells needed for monitoring, characterization and remediation activities. This report describes some of the equipment that is available from petroleum drilling operations that has direct application to groundwater characterization and remediation activities. A brief discussion of petroleum directional and horizontal well drilling methodologies is given to allow the reader to gain an understanding of the equipment needed to drill and complete horizontal wells. Equipment used in river crossing drilling technology is also discussed. The final portion of this report is a description of the drilling equipment available and how it can be applied to groundwater characterization and remediation activities

  8. Remedial actions at the former Union Carbide Corporation uranium mill sites, Rifle, Garfield County, Colorado: Final environmental impact statement

    International Nuclear Information System (INIS)

    1990-03-01

    This appendix provides the information needed to understand the conceptual designs for the remedial action alternatives addressed in this environmental impact statement (EIS). It is intended to provide sufficient details for the reader to evaluate the feasibility and assess the impacts of each remedial action alternative. It is not intended to provide the detailed engineering necessary to implement the alternatives. Details of the preferred remedial action will be presented in the remedial action plan (RAP). The remedial action alternatives addressed in this EIS include no action, stabilization at the New Rifle site, disposal at the Estes Gulch site, and disposal at the Lucas Mesa site. All alternatives include interim actions to remediate existing health and safety hazards to the Rifle community that presently exist at the Old and New Rifle processing sites. 21 figs., 18 tabs

  9. National priorities list sites: Delaware, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  10. National priorities list sites: Oklahoma, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  11. National priorities list sites: Wisconsin, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  12. National priorities list sites: Wyoming, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  13. Engineered wetlands for on-site groundwater remediation

    International Nuclear Information System (INIS)

    Wallace, S.; Davis, B.M.

    2008-01-01

    Engineered wetlands have been touted as an emerging technology for the in situ remediation of hydrocarbon-contaminated soil and water. They incorporate a horizontal subsurface flow gravel bed reactor lined with impermeable liners, and are equipped with forced bed aeration systems that enhance oxygen delivery to the wetland's aerobic micro-organisms. Engineered wetlands generally emphasize specific characteristics of wetland ecosystems to improve treatment capacities. Design parameters include biodegradation rate coefficients, flowrate, hydraulic residence time plus influent and required effluent concentrations. This paper described the installation of an engineered wetland system at a former British Petroleum (BP) refinery in Wyoming where a pipeline terminal generated contact wastewater containing benzene, toluene, ethylbenzene and xylene (BTEX) and ammonia. The wetland treatment system was designed to treat 6000 m 3 of contaminated ground water per day and has been in operation since May 2003. It was concluded that engineered wetlands can offer long-term solutions to site remediation challenges. 16 refs., 3 tabs., 6 figs

  14. Trade-offs between worker risk and public risk during remediation at DOE sites

    International Nuclear Information System (INIS)

    Beam, B.N.; Morris, J.; Blaylock, B.; Travis, C.

    1995-01-01

    Within the next 30 years, the US Department of Energy (DOE) Environmental Restoration Program will be responsible for remediating thousands of waste sites across the DOE complex. A major concern during remediation will be the protection of thousands of workers engaged in the remediation. In addition to well know safety hazards associated with conventional construction operations, remedial workers at DOE will encounter radiation and chemical exposures from radioactive, hazardous, and mixed waste. Although historically represented as minimal due to a paucity of data related to worker exposures during remediation, potential worker health risk is an important factor that must be taken into account in the selection of remedial strategies, and the potential risk reduction offered by a remedial strategy must be weighed against the potential worker risk incurred during its implementation. Analysis has shown a trend that the worker risk incurred outweighs,the benefits of risk reduction to the public

  15. Hybrid life cycle assessment comparison of colloidal silica and cement grouted soil barrier remediation technologies

    Energy Technology Data Exchange (ETDEWEB)

    Gallagher, Patricia M., E-mail: pmg24@drexel.edu [Civil, Architectural and Environmental Engineering, Drexel University, 3141 Chestnut Street, Philadelphia, PA 19038 (United States); Spatari, Sabrina; Cucura, Jeffrey [Civil, Architectural and Environmental Engineering, Drexel University, 3141 Chestnut Street, Philadelphia, PA 19038 (United States)

    2013-04-15

    Highlights: ► We use LCA to study environmental impacts of grouting techniques for site remediation. ► We consider colloidal silica permeation grouting and cement jet grouting. ► Manufacturing and transportation contribute significantly in all impact categories. ► Activity outside of direct site activity is important in assessing impacts. ► LCA can be used to consider sustainability criteria for remediation decisions. -- Abstract: Site remediation involves balancing numerous costs and benefits but often neglects the environmental impacts over the entire project life cycle. Life cycle assessment (LCA) offers a framework for inclusion of global environmental “systems-level” decision metrics in combination with technological and cost analysis. We compare colloidal silica (CS) and cement grouted soil barrier remediation technologies for soils affected by low level radionuclides at a U.S. Superfund site using hybrid LCA methods. CS is a new, high performance grouting material installed using permeation grouting techniques. Cement, a more traditional grouting material, is typically installed using jet grouting techniques. Life cycle impacts were evaluated using the US EPA TRACI 2 model. Results show the highest life cycle environmental impacts for the CS barrier occur during materials production and transportation to the site. In general, the life cycle impacts for the cement barrier were dominated by materials production; however, in the extreme scenario the life cycle impacts were dominated by truck transportation of spoils to a distant, off-site radioactive waste facility. It is only in the extreme scenario tested in which soils are transported by truck (Option 2) that spoils waste transport dominates LCIA results. Life cycle environmental impacts for both grout barriers were most sensitive to resource input requirements for manufacturing volumes and transportation. Uncertainty associated with the efficacy of new technology such as CS over its required

  16. Hybrid life cycle assessment comparison of colloidal silica and cement grouted soil barrier remediation technologies

    International Nuclear Information System (INIS)

    Gallagher, Patricia M.; Spatari, Sabrina; Cucura, Jeffrey

    2013-01-01

    Highlights: ► We use LCA to study environmental impacts of grouting techniques for site remediation. ► We consider colloidal silica permeation grouting and cement jet grouting. ► Manufacturing and transportation contribute significantly in all impact categories. ► Activity outside of direct site activity is important in assessing impacts. ► LCA can be used to consider sustainability criteria for remediation decisions. -- Abstract: Site remediation involves balancing numerous costs and benefits but often neglects the environmental impacts over the entire project life cycle. Life cycle assessment (LCA) offers a framework for inclusion of global environmental “systems-level” decision metrics in combination with technological and cost analysis. We compare colloidal silica (CS) and cement grouted soil barrier remediation technologies for soils affected by low level radionuclides at a U.S. Superfund site using hybrid LCA methods. CS is a new, high performance grouting material installed using permeation grouting techniques. Cement, a more traditional grouting material, is typically installed using jet grouting techniques. Life cycle impacts were evaluated using the US EPA TRACI 2 model. Results show the highest life cycle environmental impacts for the CS barrier occur during materials production and transportation to the site. In general, the life cycle impacts for the cement barrier were dominated by materials production; however, in the extreme scenario the life cycle impacts were dominated by truck transportation of spoils to a distant, off-site radioactive waste facility. It is only in the extreme scenario tested in which soils are transported by truck (Option 2) that spoils waste transport dominates LCIA results. Life cycle environmental impacts for both grout barriers were most sensitive to resource input requirements for manufacturing volumes and transportation. Uncertainty associated with the efficacy of new technology such as CS over its required

  17. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-10-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer at the point of compliance (POC) at the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site near Gunnison, Colorado. The proposed remedial action will ensure protection of human health and the environment. A summary of the principal features of the water resources protection strategy for the Gunnison disposal site is included in this report

  18. Hazelwood Interim Storage Site environmental report for calendar year 1992, 9200 Latty Avenue, Hazelwood, Missouri

    International Nuclear Information System (INIS)

    1993-05-01

    This report describes the environmental surveillance program at the Hazelwood Interim storage Site (HISS) and surrounding area, provides the results for 1992, and discusses applicable environmental standards and requirements with which the results were compared. HISS is located in eastern Missouri in the City of Hazelwood (St. Louis County) and occupies approximately 2.2 ha (5.5 acres). Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), which was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. In 1992 there were no environmental occurrences or unplanned contaminant releases as defined in DOE requirements and in the Superfund Amendment and Reauthorization Act (SARA) Title III of CERCLA

  19. Hazelwood Interim Storage Site environmental report for calendar year 1992, 9200 Latty Avenue, Hazelwood, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Hazelwood Interim storage Site (HISS) and surrounding area, provides the results for 1992, and discusses applicable environmental standards and requirements with which the results were compared. HISS is located in eastern Missouri in the City of Hazelwood (St. Louis County) and occupies approximately 2.2 ha (5.5 acres). Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), which was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. In 1992 there were no environmental occurrences or unplanned contaminant releases as defined in DOE requirements and in the Superfund Amendment and Reauthorization Act (SARA) Title III of CERCLA.

  20. Considering bioavailability in the remediation of heavy metal contaminated sites

    Directory of Open Access Journals (Sweden)

    Leita L.

    2013-04-01

    Full Text Available Many years of research have demonstrated that instead of the total concentration of metals in soil, bioavailability is the key to understand the environmental risk derived by metals, since adverse effects are related only to the biologically available forms of these elements. The knowledge of bioavailability can decrease the uncertainties in evaluating exposure in human and ecological risk assessment. At the same time, the efficiency of remediation treatments could be greatly influenced by availability of the contaminants. Consideration of the bioavailability processes at contaminated sites could be useful in site-specific risk assessment: the fraction of mobile metals, instead of total content should be provided as estimates of metal exposure. Moreover, knowledge of the chemical forms of heavy metals in soils is a critical component in the evaluation of applicability of different remediation technologies such as phytoremdiation or soil washing.

  1. Preliminary Hazard Classification for the Remediation of the 100-B/C Area Remaining Sites (Confirmatory Sampling Effort)

    International Nuclear Information System (INIS)

    Routt, T.M.

    2000-01-01

    This document provides the preliminary hazard classification for the sampling and characterization activities to be conducted at the 100-B/C confirmatory sampling effort sites in support of remedial design and eventual remediation of these sites

  2. Case study of manufactured gas plant site remediations using thermal desorption

    Energy Technology Data Exchange (ETDEWEB)

    Vogel, R.G.; Hayes, T.; Slimon, K.F.; Unites, D. [Southern California Gas Company, Los Angeles, CA (United States)

    1995-12-31

    Southern California Gas Company (SoCal Gas) has recently remediated five of its former manufactured gas plant (MGP) sites using on-site and off-site thermal desorption. This technology has proven effective in the treatment of PAH-contaminated soils with widely variable concentrations. At two of the five sites, MGP-contaminated materials were excavated and thermally treated on site. At the other sites, MGP-contaminated materials were excavated and transported directly to an off-site thermal desorber. Much of the production was of oil-gas, giving lampblack contamination, but some coal tar was also present.

  3. International developments in uranium mining and mill site remediation

    International Nuclear Information System (INIS)

    Quarch, H.; Kuhlmann, J.; Daroussin, J.L.; Poyser, R.W.

    1993-01-01

    At the end of production, mine sites, mill sites, tailings ponds, heap leaching residues in uranium mining districts world-wide have to be remediated in a responsible and sustainable manner in order to minimize long term environmental impacts. Current practice, regulatory environments and rehabilitation objectives in some of the most important uranium producing countries are briefly characterized as well as applicable radioprotection and geotechnical criteria. Important local and regional variables are outlined which determine optimal site specific solutions. Examples from Europe and North America are shown. Monitoring and control requirements as well as areas of current and necessary research and development are identified

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  5. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  6. Time series geophysical monitoring of permanganate injections and in situ chemical oxidation of PCE, OU1 area, Savage Superfund Site, Milford, NH, USA.

    Science.gov (United States)

    Harte, Philip T; Smith, Thor E; Williams, John H; Degnan, James R

    2012-05-01

    In situ chemical oxidation (ISCO) treatment with sodium permanganate, an electrically conductive oxidant, provides a strong electrical signal for tracking of injectate transport using time series geophysical surveys including direct current (DC) resistivity and electromagnetic (EM) methods. Effective remediation is dependent upon placing the oxidant in close contact with the contaminated aquifer. Therefore, monitoring tools that provide enhanced tracking capability of the injectate offer considerable benefit to guide subsequent ISCO injections. Time-series geophysical surveys were performed at a superfund site in New Hampshire, USA over a one-year period to identify temporal changes in the bulk electrical conductivity of a tetrachloroethylene (PCE; also called tetrachloroethene) contaminated, glacially deposited aquifer due to the injection of sodium permanganate. The ISCO treatment involved a series of pulse injections of sodium permanganate from multiple injection wells within a contained area of the aquifer. After the initial injection, the permanganate was allowed to disperse under ambient groundwater velocities. Time series geophysical surveys identified the downward sinking and pooling of the sodium permanganate atop of the underlying till or bedrock surface caused by density-driven flow, and the limited horizontal spread of the sodium permanganate in the shallow parts of the aquifer during this injection period. When coupled with conventional monitoring, the surveys allowed for an assessment of ISCO treatment effectiveness in targeting the PCE plume and helped target areas for subsequent treatment. Published by Elsevier B.V.

  7. Sampling and analysis plan for remediation of Operable Unit 100-IU-3 waste site 600-104

    International Nuclear Information System (INIS)

    1997-08-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities to support remediation of 100-IU-3 Operable Unit waste site 600-104. The purpose of the proposed sampling and analysis activities is to demonstrate that time-critical remediation of the waste site for soil containing 2,4-Dichlorophonoxyacetic acid salts and esters (2,4-D) and dioxin/furan isomers at concentrations that exceed cleanup levels has been effective. This shall be accomplished by sampling various locations of the waste site before and after remediation, analyzing the samples, and comparing the results to action levels set by the Washington State Department of Ecology

  8. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, M L [USDOE Albuquerque Operations Office, NM (United States). Uranium Mill Tailings Remedial Action Project Office; Sullivan, M [Wyoming State Government, Cheyenne, WY (United States)

    1990-04-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at an inactive uranium processing site northeast of Casper, Wyoming, and referred to as the Spook site. It provides a characterization of the present conditions at the site and also serves to document the concurrence of the State of Wyoming and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the State of Wyoming, and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement.

  9. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming

    International Nuclear Information System (INIS)

    Matthews, M.L.

    1990-04-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at an inactive uranium processing site northeast of Casper, Wyoming, and referred to as the Spook site. It provides a characterization of the present conditions at the site and also serves to document the concurrence of the State of Wyoming and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the State of Wyoming, and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement

  10. Use of technical and economic analysis for optimizing technology selection and remedial design for contaminated sites

    International Nuclear Information System (INIS)

    Hardisty, P.E.; Brown, A.

    1996-01-01

    The decision to remediate a contaminated site can be seen from the macroeconomic and microeconomic viewpoints. Macroeconomics can be used to plan and account for the overall cost of pollution as part of a firm's production, and thus make overall decisions on the real cost of pollution and the level of clean-up which may be called for. Valuation of damaged resources, option values and intrinsic worth is an important part of this process. Once the decision to remediate has been taken, the question becomes how best to remediate. Microeconomic analysis deals with providing efficient allocative decisions for reaching specified goals. it is safe to say that cost is one of the single most important factors in site clean-up decision making. A basic rule of remediation is often taken to be the maximization of contaminant mass removed per dollar spent. However, remediation may also be governed by other objectives and constraints. In some situations, minimization of time, rather than cost, could be the constraint. Or perhaps the objective could be to achieve a set level of clean-up for the lowest possible cost, even if a large program would result in unit-cost reductions. Evaluation of the economics of a clean-up project is directly linked to the objectives of the site owner, and the constraints within which the remediation is to be performed. Economic analysis of remedial options for containment of a 350,000 L hydrocarbon spill migrating through fractured rock into a river in Alberta, Canada, clear direction to the site owner

  11. Successful community relations efforts at the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    McKee, James E. Jr.; Meyer, Linda L.

    1992-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) Community Relations Program involves many participants from the U.S. Department of Energy (DOE) and the Prime Management Contractor (PMC) composed of M.K. Ferguson and Jacobs Engineering. The proactive community relations plan exceeds the compliance requirements of NEPA and CERCLA and is coordinated by a three-person staff of professional communicators. The program permeates many of the operating decisions and the result has been public acceptance of the Project and its actions to date, which has been to conduct remedial actions that will place the site in a radiologically and chemically safe condition, eliminating potential hazards to the public and environment. (author)

  12. DECHEM: A remedial planning tool for metallic contaminants in soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The DECHEM (DEcontamination of CHEMicals) method was developed for the Uranium Mill Tailings Remedial Action (UMTRA) Project to guide characterization and remedial planning for metals contamination in soils. This is necessary because non-radiological hazardous constituents may be more mobile than radium-226 (Ra-226), and hence may migrate more deeply into subpile soils (beneath tailings that are to be relocated) or into adjacent contaminated soils at UMTRA Project sites. The result is that remedial action to the Ra-226 excavation limit, as specified in the US Environmental Protection Agency (EPA) standards, may not adequately remove hazardous non-radiological contamination. Unmitigated, these contaminants in soil may cause health risks because of their presence in resuspended particles, their uptake by crops or fodder their seepage into aquifers used for drinking water or other possible exposure pathways. The DECHEM method was developed in response to the need for advanced planning for the remediation of chemical contaminants at UMTRA Project sites, and includes the following elements: Establishment of acceptable exposure rates for humans to chemicals, based on EPA guidelines or other toxicological literature. Modeling of chemical migration through environmental pathways from a remediated UMTRA Project site to humans. Determination of allowable residual concentrations (i.e., cleanup guidelines) for chemicals in soils that results in doses to humans that are below established acceptable exposure rates. The initial development and application of the DECHEM method has focused upon hazardous metallic contaminants such as arsenic, lead, molybdenum, and selenium, which are known to occur in elevated concentrations at some UMTRA Project sites

  13. Mercury in tree swallow food, eggs, bodies, and feathers at Acadia National Park, Maine, and an EPA superfund site, Ayer, Massachusetts.

    Science.gov (United States)

    Longcore, Jerry R; Haines, Terry A; Halteman, William A

    2007-03-01

    We monitored nest boxes during 1997-1999 at Acadia National Park, Mt. Desert Island, ME and at an old-field site in Orono, ME to determine mercury (Hg) uptake in tree swallow (Tachycineta bicolor) eggs, tissues, and food boluses. Also, in 1998-1999 we monitored nest boxes at Grove Pond and Plow Shop Pond at a U.S. Environmental Protection Agency Superfund site in Ayer, MA. We recorded breeding success at all locations. On average among locations, total mercury (THg) biomagnified 2 to 4-fold from food to eggs and 9 to 18-fold from food to feathers. These are minimum values because the proportion of transferable methyl mercury (MeHg) of the THg in insects varies (i.e., 35%-95% of THg) in food boluses. THg was highest in food boluses at Aunt Betty Pond at Acadia, whereas THg in eggs was highest at the Superfund site. A few eggs from nests at each of these locations exceeded the threshold (i.e., 800-1,000 ng/g, wet wt.) of embryotoxicity established for Hg. Hatching success was 88.9% to 100% among locations, but five eggs failed to hatch from 4 of the 11 clutches in which an egg exceeded this threshold. MeHg in feathers was highest in tree swallows at Aunt Betty Pond and the concentration of THg in bodies was related to the concentration in feathers. Transfer of an average of 80%-92% of the Hg in bodies to feathers may have enhanced nestling survival. Residues of Hg in tissues of tree swallows in the Northeast seem higher than those of the Midwest.

  14. Tackling the Challenge of Deep Vadose Zone Remediation at the Hanford Site

    Science.gov (United States)

    Morse, J. G.; Wellman, D. M.; Gephart, R.

    2010-12-01

    The Central Plateau of the Hanford Site in Washington State contains some 800 waste disposal sites where 1.7 trillion liters of contaminated water was once discharged into the subsurface. Most of these sites received liquids from the chemical reprocessing of spent uranium fuel to recover plutonium. In addition, 67 single shell tanks have leaked or are suspected to have leaked 3.8 million liters of high alkali and aluminate rich cesium-contaminated liquids into the sediment. Today, this inventory of subsurface contamination contains an estimated 550,000 curies of radioactivity and 150 million kg (165,000 tons) of metals and hazardous chemicals. Radionuclides range from mobile 99Tc to more immobilized 137Cs, 241Am, uranium, and plutonium. A significant fraction of these contaminants likely remain within the deep vadose zone. Plumes of groundwater containing tritium, nitrate, 129I and other contaminants have migrated through the vadose zone and now extend outward from the Central Plateau to the Columbia River. During most of Hanford Site history, subsurface studies focused on groundwater monitoring and characterization to support waste management decisions. Deep vadose zone studies were not a priority because waste practices relied upon that zone to buffer contaminant releases into the underlying aquifer. Remediation of the deep vadose zone is now central to Hanford Site cleanup because these sediments can provide an ongoing source of contamination to the aquifer and therefore to the Columbia River. However, characterization and remediation of the deep vadose zone pose some unique challenges. These include sediment thickness; contaminant depth; coupled geohydrologic, geochemical, and microbial processes controlling contaminant spread; limited availability and effectiveness of traditional characterization tools and cleanup remedies; and predicting contaminant behavior and remediation performance over long time periods and across molecular to field scales. The U

  15. Proposed plan for remedial action at the chemical plant area of the Weldon Spring site

    International Nuclear Information System (INIS)

    1992-11-01

    This proposed plan addresses the management of contaminated material at the chemical plant area of the Weldon Spring site and nearby properties in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry, both of which are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced at the chemical plant in the 1940s, and uranium and thorium materials were processed in the 1950s and 1960s. Various liquid, sludge, and solid wastes were disposed of at the Chemical plant area and in the quarry during that time. The Weldon Spring site is listed on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The proposed plan is organized as follows: Chapter 2 presents the history and setting of the Weldon Spring site and briefly describes the contaminated material at the chemical plant area. Chapter 3 defines the scope of the remedial action and its role in the Weldon Spring Site Remedial Action Project. Chapter 4 summarizes the risks associated with possible exposures to site contaminants in the absence of remedial action and identifies proposed cleanup levels for soil. Chapter 5 briefly describes the final alternatives considered for the remedial action. Chapter 6 summarizes the evaluation of final alternatives for managing the contaminated material, identifies the currently preferred alternative, and discusses a possible contingency remedy to provide treatment flexibility. Chapter 7 presents the community's role in this action. Chapter 8 is a list of the references cited in this proposed plan

  16. The role of risk assessment in remedial action cleanup programs (RACP): A case history

    International Nuclear Information System (INIS)

    Fessler, R.G.; Bergmann, W.R.; Greenberg, A.J.

    1988-01-01

    A RACP (Remedial Action Cleanup Program) selects site cleanup criteria that protect human health and the environment and are cost effective. They generally use existing environmental standards and/or guidelines which include safe drinking water, RCRA groundwater protection, threshold limit values and air quality standards, and recommended soil cleanup level guidelines. If these are the only criteria used, the RACP may be more stringent and expensive than necessary. Another step, a risk assessment program, should then be considered in the cleanup decision process. A risk assessment uses chemical concentrations observed in soils, groundwater, and air to project their impact on human health and the environment. Toxicological data on human exposure to these concentrations (LD 50s and carcinogenic action levels) are used to assess risks to human health and the environment. The risk assessment also considers the probability of exposure. E.g., remedial programs at Superfund sites consider three criteria in order to assess risks to human health and the environment: (1) pathways of exposure, (2) population at risk, and (3) chemicals of concern. By eliminating or severely limiting the significance of any criteria, the site may no longer represent a significant risk. This paper presents a RACP case history where a risk assessment was needed to select a cost effective and environmentally acceptable cleanup program

  17. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  18. Final Work Plan for a Remedial Action Plan in Support of the Risk-Based Approach to Remediation at KC-135 Crash Site

    National Research Council Canada - National Science Library

    1994-01-01

    ... receptor exposure to fuel-hydrocarbon- contaminated environmental media at the KC-135 Crash Site. The second goal is to implement any necessary and appropriate remedial technologies at the KC-135 Crash Site...

  19. Challenges in Obtaining Property Access: The FUSRAP Maywood Site Experience - 13433

    Energy Technology Data Exchange (ETDEWEB)

    Kollar, William [Shaw Environmental, Inc., 100 West Hunter Avenue, Maywood, NJ 07607 (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the US government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. Many of these sites are not owned by the federal government and therefore require owner permission to enter. The experience in pursuing such access at the FUSRAP Maywood Superfund Site (the Maywood Site or the Site) in Bergen County, New Jersey, is extensive. Since the US Army Corps of Engineers (the Corps) assumed responsibility for the Maywood Site from the US Department of Energy in 1997, at least 186 separate property access agreements (known in FUSRAP as a Real Estate Right-of- Entry or ROE) have been executed between the Corps and approximately 55 different land owners and tenant occupants at the Maywood Site (agreement renewals with the same owners over time account for the difference). Maywood's experience during the Corps' tenure, reflected here in three case studies of representative property access efforts, offers some lessons and best practices that may apply to other remedial programs. While the Site Community Relations Manager (the author of this paper) managed the property access task, multi-disciplinary support from across the project was also critical to success in this endeavor. (authors)

  20. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  1. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes

    International Nuclear Information System (INIS)

    1996-10-01

    This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation

  2. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation.

  3. Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

  4. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  5. National priorities list sites: New York, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  6. National priorities list sites: North Carolina, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  7. National priorities list sites: New Mexico, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  8. Pilot Project to Optimize Ground Water Remediation Systems at RCRA Corrective Action Facilities: Summary Report and Lessons Learned

    Science.gov (United States)

    Based on previous success with conducting independent optimization evaluations at Fund-lead pump and treat sites (i.e., those sites with pump and treat systems funded and managed by Superfund and the States), the EPA Office of Superfund .....

  9. Screening of groundwater remedial alternatives for brownfield sites: a comprehensive method integrated MCDA with numerical simulation.

    Science.gov (United States)

    Li, Wei; Zhang, Min; Wang, Mingyu; Han, Zhantao; Liu, Jiankai; Chen, Zhezhou; Liu, Bo; Yan, Yan; Liu, Zhu

    2018-06-01

    Brownfield sites pollution and remediation is an urgent environmental issue worldwide. The screening and assessment of remedial alternatives is especially complex owing to its multiple criteria that involves technique, economy, and policy. To help the decision-makers selecting the remedial alternatives efficiently, the criteria framework conducted by the U.S. EPA is improved and a comprehensive method that integrates multiple criteria decision analysis (MCDA) with numerical simulation is conducted in this paper. The criteria framework is modified and classified into three categories: qualitative, semi-quantitative, and quantitative criteria, MCDA method, AHP-PROMETHEE (analytical hierarchy process-preference ranking organization method for enrichment evaluation) is used to determine the priority ranking of the remedial alternatives and the solute transport simulation is conducted to assess the remedial efficiency. A case study was present to demonstrate the screening method in a brownfield site in Cangzhou, northern China. The results show that the systematic method provides a reliable way to quantify the priority of the remedial alternatives.

  10. Geophysical logging and thermal imaging near the Hemphill Road TCE National Priorities List Superfund site near Gastonia, North Carolina

    Science.gov (United States)

    Antolino, Dominick J.; Chapman, Melinda J.

    2017-03-27

    Borehole geophysical logs and thermal imaging data were collected by the U.S. Geological Survey near the Hemphill Road TCE (trichloroethylene) National Priorities List Superfund site near Gastonia, North Carolina, during August 2014 through February 2015. In an effort to assist the U.S. Environmental Protection Agency in the development of a conceptual groundwater model for the assessment of current contaminant distribution and future migration of contaminants, surface geological mapping and borehole geophysical log and thermal imaging data collection, which included the delineation of more than 600 subsurface features (primarily fracture orientations), was completed in five open borehole wells and two private supply bedrock wells. In addition, areas of possible groundwater discharge within a nearby creek downgradient of the study site were determined based on temperature differences between the stream and bank seepage using thermal imagery.

  11. Screening and comparison of remedial alternatives for the South Field and flyash piles at the Fernald site

    International Nuclear Information System (INIS)

    Bumb, A.C.; Jones, G.N.

    1996-05-01

    The South Field, the Inactive Flyash Pile, and the Active Flyash Pile are in close proximity to each other and are part of Operable Unit 2 (OU2) at the Fernald Environmental Management Project (FEMP). The baseline risk assessment indicated that the exposure pathways which pose the most significant risk are external radiation from radionuclides in surface soils and use of uranium contaminated groundwater. This paper presents screening and comparison of various remedial alternatives considered to mitigate risks from the groundwater pathway. Eight remedial alternatives were developed which consisted of consolidation and capping, excavation and off-site disposal with or without treatment, excavation and on-site disposal with or without treatment and combinations of these. Risk-based source (soil) preliminary remediation levels (PRLs) and waste acceptance criteria (WACs) were developed for consolidation and capping, excavation, and on-site disposal cell. The PRLs and WACs were developed using an integrated modeling tool consisting of an infiltration model, a surface water model, a vadose zone model, and a three-dimensional contaminant migration model in saturated media. The PRLs and WACs were then used to determine need for soil treatment, determine excavation volumes, and screen remedial alternatives. The selected remedial alternative consisted of excavation and on-site disposal with off-site disposal of the fraction exceeding the WAC

  12. Compliance monitoring for remediated sites

    International Nuclear Information System (INIS)

    1999-10-01

    Throughout the world, many countries have experienced problems associated with pollution of the environment. Poorly managed practices in nuclear fuel cycle, medicine, industry, weapons production and testing, research and development activities, as well as accidents, and poor disposal practices have produced a large array of radioactively contaminated facilities and sites. Structures, biota, soils, rocks, and both surface and groundwaters have become contaminated with radionuclides and other associated contaminants, a condition that raises serious concern due to potential health effects to the exposed human populations and the environment. In response to the needs of its Member States in dealing with the problems of radioactive contamination in the environment, the IAEA has established an Environmental Restoration Project. The principal aspects of current IAEA efforts in this area include (1) gathering information and data, performing analyses, and publishing technical summaries, and other documents on key technical aspects of environmental restoration; (2) conducting a Co-ordinated Research Project on Environmental Restoration; and (3) providing direct technical assistance to Member States through technical co-operation programmes. The transfer of technologies to Member States in need of applicable methodologies and techniques for the remediation of contaminated sites is a principal objective of this project

  13. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  14. Environmental remediation. Strategies and techniques for cleaning radioactively contaminated sites

    International Nuclear Information System (INIS)

    Falck, W. Eberhard

    2001-01-01

    Actions for a cleaner and safety environment have risen on social and political agendas in recent years. They include efforts to remediate contaminated sites posing a radiological risk to humans and the surrounding environment. Radiological risks can result from a variety of nuclear and non-nuclear activities. They include: nuclear or radiological accidents; nuclear weapons production and testing; poor radioactive waste management and disposal practices; industrial manufacturing involving radioactive materials; conventional mining and milling of ores and other production processes, e.g. oil and gas production, resulting in enhanced concentrations of naturally occurring radioactive materials (NORMs). The IAEA has developed a comprehensive programme directed at the remediation of radioactively contaminated sites. The programme collates and distributes knowledge about contaminated sites; appropriate methods for their characterization; assessment of their potential environmental and radiological impact; and applicable methods for their clean-up, following internationally recommended safety criteria. The overall resources, and which are technologically less advanced, to focus their efforts and chose appropriate strategies for the abatement or removal of exposure to radiation. An important aspect is the intention to 'close the loop' in the nuclear fuel cycle in the interests of sustainable energy development including nuclear power

  15. Proceedings of the 2000 contaminated site remediation conference. From source zones to ecosystems. 2 volumes

    International Nuclear Information System (INIS)

    Johnston, C.D.

    2000-01-01

    The conference theme, 'From Source Zones to Ecosystems' , indicate the recognition of the fact that once released into environment, contaminants followed a pathway from the source to the point of impact with an ecosystem or other receptors, consequently care is taken to associate remediation with reducing risk to these receptors. The papers, presented at the conference provide a guide to current practice and future direction of contaminated site remediation in Australia and internationally. Monitored natural attenuation is considered as is an increased body of evidence available to evaluate this approach when managing site contamination for Australian conditions. Remediation strategies for heavy metal contamination appear to be underdeveloped and indeed underrepresented. The phyto remediation is being developed to ameliorate the problem and there is also a focus on the bioavailability of metals and on better defining the risk they pose

  16. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  17. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  18. Modifications to the remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Green River, Utah

    International Nuclear Information System (INIS)

    1994-09-01

    Modifications to the water resources protection strategy detailed in the remedial action plan for the Green River, Utah, disposal site are presented. The modifications are based on new information, including ground water quality data collected after remedial action was completed and on a revised assessment of disposal cell design features, surface conditions, and site hydrogeology. The modifications will result in compliance with the U.S. EPA proposed ground water standards (52 FR 36000 (1987))

  19. Selection of remedial alternatives for mine sites: a multicriteria decision analysis approach.

    Science.gov (United States)

    Betrie, Getnet D; Sadiq, Rehan; Morin, Kevin A; Tesfamariam, Solomon

    2013-04-15

    The selection of remedial alternatives for mine sites is a complex task because it involves multiple criteria and often with conflicting objectives. However, an existing framework used to select remedial alternatives lacks multicriteria decision analysis (MCDA) aids and does not consider uncertainty in the selection of alternatives. The objective of this paper is to improve the existing framework by introducing deterministic and probabilistic MCDA methods. The Preference Ranking Organization Method for Enrichment Evaluation (PROMETHEE) methods have been implemented in this study. The MCDA analysis involves processing inputs to the PROMETHEE methods that are identifying the alternatives, defining the criteria, defining the criteria weights using analytical hierarchical process (AHP), defining the probability distribution of criteria weights, and conducting Monte Carlo Simulation (MCS); running the PROMETHEE methods using these inputs; and conducting a sensitivity analysis. A case study was presented to demonstrate the improved framework at a mine site. The results showed that the improved framework provides a reliable way of selecting remedial alternatives as well as quantifying the impact of different criteria on selecting alternatives. Copyright © 2013 Elsevier Ltd. All rights reserved.

  20. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  1. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  2. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  3. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project

  4. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project.

  5. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as ''the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as ''the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs

  6. Remedial Investigation of Hanford Site Releases to the Columbia River - 13603

    Energy Technology Data Exchange (ETDEWEB)

    Lerch, J.A.; Hulstrom, L.C. [Washington Closure Hanford, LLC, Richland, Washington 99354 (United States); Sands, J.P. [U.S Department of Energy, Richland Operations Office, Richland, Washington 99352 (United States)

    2013-07-01

    In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previously investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation

  7. Environmental remediation of an Alstom grid industrial site (France) - 59270

    International Nuclear Information System (INIS)

    Romero, Stephanie

    2012-01-01

    ALSTOM Grid is the project owner of the remediation of a former industrial site, located in Saint-Ouen, north of Paris. The industrial activity (power transformer production) started in 1921 and stopped in 2006. The type of pollution is linked with the former activity. It's an organic pollution: hydrocarbon, PCB and chlorinated volatile organic compounds. The clean-up concerns soil and groundwater. The main specificity of the project is that the remediation is operated inside the existing industrial buildings which must be kept in place and restituted to the owner after the works. The treatment of soil requires excavating soil up to 9 m deep (1 m under the level of the groundwater) inside the buildings. As a consequence, some impressive devices were set up to ensure the stability of the buildings during the clean-up, like support structures of the foundations and strengthening of the building fronts. In the same time, it has to be pointed out that great diversity of clean-up actions is performed on the site: the soil is excavated to be treated on site (bioremediation or chemical treatment) or off site. The treatment of groundwater consists of pumping the oil staying on the surface and oxidizing the dissolved pollution. This project is probably the first experience of this scale in France with multi-contaminated soil and groundwater decontamination in keeping and reinforcing the existing buildings. (authors)

  8. Workbook for prioritizing petroleum industry exploration and production sites for remediation

    International Nuclear Information System (INIS)

    White, G.J.

    1998-01-01

    The purpose of this Workbook is to provide a screening-level method for prioritizing petroleum exploration and production sites for remediation that is based on readily available information, but which does not require a full characterization of the sites being evaluated. The process draws heavily from the Canadian National Classification System for Contaminated Sites, and fits into the framework for ecological risk assessment provided in guidance from the US Environmental Protection Agency. Using this approach, scoring guidelines are provided for a number of Evaluation Factors relating to: (1) the contaminants present at the site; (2) the potential exposure pathways for these contaminants; and (3) the potential receptors of those contaminants. The process therefore incorporates a risk-based corrective action (RBCA) framework to estimate the relative threat posed by a site to human health and to ecological systems. Physical (non-toxic) disturbance factors have also been incorporated into the process. It should also be noted that the process described in this Workbook has not yet been field tested at petroleum E and P sites. The first logical step in the field testing of this process is to apply the method at a small number of sites to assess the availability of the information that is needed to score each evaluation factor. Following this evaluation, the Workbook process should be applied at a series of sites to determine the effectiveness of the process at ranking sites according to their relative need for remediation. Upon completion of these tests, the Workbook should be revised to reflect the findings of the field tests

  9. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  10. Sampling and analysis plan for volatile organic compounds in storm drain for the Upper East Fork Poplar Creek characterization area remedial investigation at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-03-01

    The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Department of Energy and managed by Lockheed Martin Energy Systems, Inc. The Y-12 Plant is one of three major facilities on the ORR. The ORR contains both hazardous- and mixed-waste sites that are subject to regulations promulgated under the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986. Under RCRA guidelines and requirements from the Tennessee Department of Environment and Conservation, the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire ORR was placed on the National Priorities List of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions

  11. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-03-01

    Attachment 3 Groundwater Hydrology Report describes the hydrogeology, water quality, and water resources at the processing site and Dry Flats disposal site. The Hydrological Services calculations contained in Appendix A of Attachment 3, are presented in a separate report. Attachment 4 Water Resources Protection Strategy describes how the remedial action will be in compliance with the proposed EPA groundwater standards

  12. Maxey Flats low-level waste disposal site closure activities

    International Nuclear Information System (INIS)

    Haight, C.P.; Mills, D.; Razor, J.E.

    1987-01-01

    The Maxey Flats Radioactive Waste Disposal Facility in Fleming County, Kentucky is in the process of being closed. The facility opened for commercial business in the spring of 1963 and received approximately 4.75 million cubic feet of radioactive waste by the time it was closed in December of 1977. During fourteen years of operation approximately 2.5 million curies of by-product material, 240,000 kilograms of source material, and 430 kilograms of special nuclear material were disposed. The Commonwealth purchased the lease hold estate and rights in May 1978 from the operating company. This action was taken to stabilize the facility and prepare it for closure consisting of passive care and monitoring. To prepare the site for closure, a number of remedial activities had to be performed. The remediation activities implemented have included erosion control, surface drainage modifications, installation of a temporary plastic surface cover, leachate removal, analysis, treatment and evaporation, US DOE funded evaporator concentrates solidification project and their on-site disposal in an improved disposal trench with enhanced cover for use in a humid environment situated in a fractured geology, performance evaluation of a grout injection demonstration, USGS subsurface geologic investigation, development of conceptual closure designs, and finally being added to the US EPA National Priority List for remediation and closure under Superfund. 13 references, 3 figures

  13. Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Faust, R.A.; Fore, C.S.; Knox, N.P.

    1980-09-01

    This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory.

  14. Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography

    International Nuclear Information System (INIS)

    Faust, R.A.; Fore, C.S.; Knox, N.P.

    1980-09-01

    This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory

  15. RCRA Facility Investigation/Remedial Investigation Report for the Grace Road Site (631-22G)

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E.

    1998-10-02

    This report summarizes the activities and documents the results of a Resource Conservation and Recovery Act Facility Investigation/Remedial Investigation conducted at Grace Road Site on the Savannah River Site near Aiken, South Carolina.

  16. RCRA Facility Investigation/Remedial Investigation Report for the Grace Road Site (631-22G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1998-01-01

    This report summarizes the activities and documents the results of a Resource Conservation and Recovery Act Facility Investigation/Remedial Investigation conducted at Grace Road Site on the Savannah River Site near Aiken, South Carolina

  17. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1993-07-01

    This report presents geologic considerations that are pertinent to the Remedial Action Plan for Slick Rock mill tailings. Topics covered include regional geology, site geology, geologic stability, and geologic suitability

  18. CERCLA and RCRA requirements affecting cleanup of a hazardous waste management unit at a Superfund site: A case study

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1995-03-01

    The Fernald Environmental Management Project (FEMP) attempted to address both RCRA and CERCLA requirements at the fire training facility (FTF) by integrating a CERCLA removal action work plan with a RCRA closure plan. While the regulatory agencies involved with the FTF cleanup agreed the integrated document was a good idea, implementation proved complicated, owing to disposition of clean debris from a Superfund site, treatment of contaminated media, duration of cleanup activities, and cleanup certification. While all the complications have not been resolved, solutions to all have been proposed to Ohio EPA and U.S. EPA. Both agencies have worked closely with FEMP to find the most effective fulfillment of RCRA and CERCLA requirements

  19. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  20. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  1. Site Features

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of various site features from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times...

  2. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    Energy Technology Data Exchange (ETDEWEB)

    Levine, M.B.; Sigmon, C.F.

    1989-09-29

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges.

  3. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    International Nuclear Information System (INIS)

    Levine, M.B.; Sigmon, C.F.

    1989-01-01

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges

  4. ALTERNATIVE REMEDIATION TECHNOLOGY STUDY FOR GROUNDWATER TREATMENT AT 200-PO-1 OPERABLE UNIT AT HANFORD SITE

    Energy Technology Data Exchange (ETDEWEB)

    DADO MA

    2008-07-31

    This study focuses on the remediation methods and technologies applicable for use at 200-PO-I Groundwater Operable Unit (OU) at the Hanford Site. The 200-PO-I Groundwater au requires groundwater remediation because of the existence of contaminants of potential concern (COPC). A screening was conducted on alternative technologies and methods of remediation to determine which show the most potential for remediation of groundwater contaminants. The possible technologies were screened to determine which would be suggested for further study and which were not applicable for groundwater remediation. COPCs determined by the Hanford Site groundwater monitoring were grouped into categories based on properties linking them by remediation methods applicable to each COPC group. The screening considered the following criteria. (1) Determine if the suggested method or technology can be used for the specific contaminants found in groundwater and if the technology can be applied at the 200-PO-I Groundwater au, based on physical characteristics such as geology and depth to groundwater. (2) Evaluate screened technologies based on testing and development stages, effectiveness, implementability, cost, and time. This report documents the results of an intern research project conducted by Mathew Dado for Central Plateau Remediation in the Soil and Groundwater Remediation Project. The study was conducted under the technical supervision of Gloria Cummins and management supervision of Theresa Bergman and Becky Austin.

  5. Site remediation using photocatalytic VOC destruction of chlorinated hydrocarbons

    Energy Technology Data Exchange (ETDEWEB)

    Brunet, R.A.H.; Pearcey, R.; Kittrell, J.R.; Mackin, G.; Wise, C.A.

    1999-07-01

    An innovative environmental technology has been developed and demonstrated for cost-effective control of toxic air emissions, such as trichloroethylene (TCE) and perchloroethylene (PCE), found in soil and groundwater at hazardous waste sites and in industrial effluents. The technology uses UV light and a proprietary photocatalyst to adsorb and destroy pollutants at ambient conditions, even with high humidity. Air stripping and soil vapor extraction efficiently transfer the pollutants to the gas phase, where they can be economically treated by photocatalysis without the risk of hazardous by-product formation. The AIR2000 photocatalytic technology was successfully installed at the Stamina Mills Superfund site in Rhode Island, where a commercial scale unit is treating 700 cfm of up to 1,000 ppm TCE, mixed with PCE, dichloroethylene (DCE), trichloroethane (TCA), and vinyl chloride (VC) produced through a combination of soil vapor extraction (SVE) and air stripping. As part of the EPA SITE program, the system was monitored for overall destruction removal efficiency (DRE) and hazardous by-product formation. A DRE in excess of 99% was reported over the first four months of operation, with greater than 99.99% DRE achieved, without production of hazardous by-products. The operating cost of the system is approximately 20% of activated carbon adsorption, which provides approximately $1,500,000 in cost savings over the life of the Stamina Mills project. The Adsorption Integrated Reaction (AIR) process is the recipient of the 1997 SBIR Technology of the Year award, the 1998 EPA Environmental Technology Innovator Award, and the 1998 R and D 100 Award.

  6. SUPERFUND TREATABILITY CLEARINGHOUSE: FINAL REPORT DEMONSTRATION TEST ON-SITE PCB DESTRUCTION, SHIRCO INFRARED PORTABLE UNIT AT FLORIDA STEEL INDIANTOWN MILL SITE, INDIANTOWN, FLORIDA.

    Science.gov (United States)

    This document reports on the results of a Florida Steel Corporation study to develop and evaluate cleanup alternatives for onsite treatment of PCB contaminated soils. The results of this study aided in the selection of an approach to remediate the site. Demonstration tes...

  7. Bioaccumulation of polychlorinated biphenyls and organochlorine pesticides in young-of-the-year bluefish (Pomatomus saltatrix) in the vicinity of a Superfund Site in New Bedford Harbor, Massachusetts, and in the adjacent waters.

    Science.gov (United States)

    Deshpande, Ashok D; Dockum, Bruce W; Cleary, Thomas; Farrington, Cameron; Wieczorek, Daniel

    2013-07-15

    for the New Bedford Harbor Superfund Site that is currently being remediated. Published by Elsevier Ltd.

  8. Remediation options and treatment for Tebuthiuron at an upstream oil and gas site

    Energy Technology Data Exchange (ETDEWEB)

    Lin, F. [EBA Engineering Consultants Ltd., Edmonton, AB (Canada)

    2009-07-01

    Sterilants are strong herbicides that contain teburithion, a substance of concern in remediation and reclamation activities. Tebuthiuron has very high to low mobility in soils, and its sorption capacity increases in relation to clay and organic matter content. There is currently no soil benchmark for sterilants. Remedial options for tebuthiuron include adsorption with amendments, thermal desorption, and soil flushing with injected solutions. A recent pilot plant successfully used thermal desorption to treat soil contaminated with tebuthiuron and bromacil to below laboratory detection limits. Surface soils at the site were contaminated to a depth of 4 m. A temperature ramping study was performed to determine optimal treatment temperatures. A total of 15,136 tonnes of soil were treated and then used as backfill on-site. Water at the site was monitored and treated with charcoal filters. Hydrocarbon-contaminated soil at the site was also successfully treated using the thermal desorption process. tabs., figs.

  9. Analyzing Patterns of Community Interest at a Legacy Mining Waste Site to Assess and Inform Environmental Health Literacy Efforts

    Science.gov (United States)

    Ramirez-Andreotta, Monica D.; Lothrop, Nathan; Wilkinson, Sarah T.; Root, Robert A.; Artiola, Janick F.; Klimecki, Walter; Loh, Miranda

    2015-01-01

    Understanding a community’s concerns and informational needs is crucial to conducting and improving environmental health research and literacy initiatives. We hypothesized that analysis of community inquiries over time at a legacy mining site would be an effective method for assessing environmental health literacy efforts and determining whether community concerns were thoroughly addressed. Through a qualitative analysis, we determined community concerns at the time of being listed as a Superfund site. We analyzed how community concerns changed from this starting point over the subsequent years, and whether: 1) communication materials produced by the USEPA and other media were aligned with community concerns; and 2) these changes demonstrated a progression of the community’s understanding resulting from community involvement and engaged research efforts. We observed that when the Superfund site was first listed, community members were most concerned with USEPA management, remediation, site-specific issues, health effects, and environmental monitoring efforts related to air/dust and water. Over the next five years, community inquiries shifted significantly to include exposure assessment and reduction methods and issues unrelated to the site, particularly the local public water supply and home water treatment systems. Such documentation of community inquiries over time at contaminated sites is a novel method to assess environmental health literacy efforts and determine whether community concerns were thoroughly addressed. PMID:27595054

  10. National priorities list sites: The United States Territories, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  11. Building dismantlement and site remediation at the Apollo Fuel Plant: When is technology the answer?

    International Nuclear Information System (INIS)

    Walton, L.

    1995-01-01

    The Apollo fuel plant was located in Pennsylvania on a site known to have been used continuously for stell production from before the Civil War until after World War II. Then the site became a nuclear fuel chemical processing plants. Finally it was used to convert uranium hexafluoride to various oxide fuel forms. After the fuel manufacturing operations were teminated, the processing equipment was partially decontaminated, removed, packaged and shipped to a licensed low-level radioactive waste burial site. The work was completed in 1984. In 1990 a detailed site characterization was initiated to establishe the extent of contamination and to plan the building dismantlement and soil remediation efforts. This article discusses the site characterization and remedial action at the site in the following subsections: characterization; criticality control; mobile containment; soil washing; in-process measurements; and the final outcome of the project

  12. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado: Remedial action selection report

    International Nuclear Information System (INIS)

    1992-10-01

    The Gunnison uranium mill tailings site is just south of the city limits of Gunnison, Colorado, in the south-central part of the state. The entire site covers 61 acres in the valley of the Gunnison River and Tomichi Creek. Contaminated materials at the Gunnison processing site include the tailings pile, covering about 35 acres to an average depth of nine feet and containing 459,000 cubic yards. Ore storage areas and the former mill processing area cover about 20 acres on the south side of the site. The volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 718,900 cubic yards. An interim action was approved by the US Department of Energy to eliminate existing safety hazards to the Gunnison community. These actions, started in September 1991, included demolition of mill buildings and related processing facilities, excavation of two underground storage tanks, removal of asbestos and other hazardous materials from buildings, storage of those materials in a secured area on the site, and improvements of site security

  13. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    Bachrach, A.; Hoopes, J.; Morycz, D.; Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P.; Rice, G.

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated [vicinity] properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed

  14. Remotely operated excavator needs assessment/site visit summary

    Energy Technology Data Exchange (ETDEWEB)

    Straub, J.; Haller, S.; Worsley, R. [Westinghouse Environmental Management Co. of Ohio, Cincinnati, OH (United States); King, M. [THETA Technology Inc. (United States)

    1992-12-02

    The Uranium in Soils Integrated Demonstration requested an assessment of soil excavation needs relative to soil remediation. The following list identifies the DOE sites assessed: Mound Laboratory, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant, Nevada Test Site, Lawrence Livermore National Laboratory, Rocky Flats Plant, Los Alamos National Laboratory, Sandia National Laboratory, Idaho National Engineering Laboratory, Hanford Site, and Fernald Site. The reviewed sites fall into one or more of the following three categories: production, EPA National Priorities List, or CERCLA (superfund) designation. Only three of the sites appear to have the need for a remotely operated excavator rope. Hanford and Idaho Falls have areas of high-level radioactive contamination either buried or in/under buildings. The Fernald site has a need for remote operated equipment of different types. It is their feeling that remote equipment can be used to remove the health dangers to humans by removing them from the area. Most interviewees stated that characterization technologies needs are more immediate concern over excavation. In addition, the sites do not have similar geographic conditions which would aid in the development of a generic precision excavator. The sites visited were not ready to utilize or provide the required design information necessary to draft a performance specification. This creates a strong case against the development of one type of ROPE for use at these sites. Assuming soil characterization technology/methodology is improved sufficiently to allow accurate and real time field characterization then development of a precision excavator might be pursued based on FEMP needs, since the FEMP`s sole scope of work is remediation. The excavator could then be used/tested and then later modified for other sites as warranted.

  15. Sampling and analysis plan for remediation of Operable Unit 100-IU-3 waste site 600-104. Revision 1

    International Nuclear Information System (INIS)

    1997-08-01

    This sampling and analysis plan presents the rationale and strategy for the sampling and analysis activities to support remediation of 100-IU-3 Operable Unit waste site 600-104. The purpose of the proposed sampling and analysis activities is to demonstrate that time-critical remediation of the waste site for soil containing 2,4-Dichlorophenoxyacetic acid salts and esters (2,4-D) and dioxin/furan isomers at concentrations that exceed cleanup levels has been effective. This shall be accomplished by sampling various locations of the waste site before and after remediation, analyzing the samples, and comparing the results to action levels set by the Washington State Department of Ecology

  16. Remediation options and the significance of water treatment at former uranium production sites in Eastern Germany

    International Nuclear Information System (INIS)

    Gatzweiler, R.; Jakubick, A.T.; Kiessig, G.

    2000-01-01

    The WISMUT remediation project in the States of Saxony and Thuringia, Germany, comprises several mine and mill sites including large volumes of production residues. Due to the climate, the intensive land use and the regulatory conditions, the water path is most important in evaluating remediation options. Water treatment is an integral part of mine flooding, mine dump and tailings remediation, and treatment costs represent a major portion of the overall costs of the project. Uncertainties in the estimations of quantities of mine and seepage waters, variations in quality from site to site, and changing conditions in time demand a strategic approach to the selection and optimization of water treatment methods. The paper describes options considered and experience gained including efforts to limit long-term treatment costs by developing and applying passive treatment systems and negotiating acceptable discharge limits. (author)

  17. Case study: remediation of a former uranium mining/processing site in Hungary

    International Nuclear Information System (INIS)

    Csovari, M. et al.

    2004-01-01

    The Hungarian uranium mining activities near Pecs lasted from 1958 to 1997. Approximately 46 Mt of rock were mined, from which 18.8 Mt of upgraded ore were processed. Some ore had been exported prior to the construction of the processing plant at the site. Remediation of the former uranium-related industrial sites is being carried out by the Mecsek Ore Environment Ltd. and started in the 1990s. Today the former mines and their surroundings are rehabilitated, former heap piles and a number of smaller waste rock piles have been relocated to a more protected area (waste rock pile N 3). Ongoing core remediation activities are directed to the remediation of the tailings ponds, and also water treatment issues are most important. Three water treatment facilities are currently in operation: a mine water treatment system with the objective to remove uranium and gain a marketable by-product; a pump-and-treat system to restore the groundwater quality in the vicinity of the tailing ponds; a pilot-scale, experimental passive in-situ groundwater treatment system to avoid migration of uranium contaminated groundwater. Refs. 5 (author)

  18. Shocking Path of Least Resistance Shines Light on Subsurface by Revealing the Paths of Water and the Presence of Faults: Stacked EM Case Studies over Barite Hills Superfund Site in South Carolina

    Science.gov (United States)

    Haggar, K. S.; Nelson, H. R., Jr.; Berent, L. J.

    2017-12-01

    The Barite Hills/Nevada Gold Fields mines are in Late Proterozoic and early Paleozoic rocks of the gold and iron sulfides rich Carolina slate belt. The mines were active from 1989 to1995. EPA and USGS site investigations in 2003 resulted in the declaration of the waste pit areas as a superfund site. The USGS and private consulting firms have evaluated subsurface water flow paths, faults & other groundwater-related features at this superfund site utilizing 2-D conductivity & 3-D electromagnetic (EM) surveys. The USGS employed conductivity to generate instantaneous 2-D profiles to evaluate shallow groundwater patterns. Porous regolith sediments, contaminated water & mine debris have high conductivity whereas bedrock is identified by its characteristic low conductivity readings. Consulting contractors integrated EM technology, magnetic & shallow well data to generate 3-D images of groundwater flow paths at given depths across the superfund site. In so doing several previously undetected faults were identified. Lighting strike data was integrated with the previously evaluated electrical and EM data to determine whether this form of natural-sourced EM data could complement and supplement the more traditional geophysical data described above. Several lightning attributes derived from 3-D lightning volumes were found to correlate to various features identified in the previous geophysical studies. Specifically, the attributes Apparent Resistivity, Apparent Permittivity, Peak Current & Tidal Gravity provided the deepest structural geological framework & provided insights into rock properties & earth tides. Most significantly, Peak Current showed remarkable coincidence with the preferred groundwater flow map identified by one of the contractors utilizing EM technology. This study demonstrates the utility of robust integrated EM technology applications for projects focused on hydrology, geohazards to dams, levees, and structures, as well as mineral and hydrocarbon exploration.

  19. Technical Evaluation of Soil Remediation Alternatives at the Building 812 Operable Unit, Lawrence Livermore National Laboratory Site 300

    International Nuclear Information System (INIS)

    Eddy-Dilek, C.; Miles, D.; Abitz, R.

    2009-01-01

    The Department of Energy Livermore Site Office requested a technical review of remedial alternatives proposed for the Building 812 Operable Unit, Site 300 at the Lawrence Livermore National Laboratory. The team visited the site and reviewed the alternatives proposed for soil remediation in the draft RI/FS and made the following observations and recommendations. Based on the current information available for the site, the team did not identify a single technology that would be cost effective and/or ecologically sound to remediate DU contamination at Building 812 to current remedial goals. Soil washing is not a viable alternative and should not be considered at the site unless final remediation levels can be negotiated to significantly higher levels. This recommendation is based on the results of soil washing treatability studies at Fernald and Ashtabula that suggest that the technology would only be effective to address final remediation levels higher than 50 pCi/g. The technical review team identified four areas of technical uncertainty that should be resolved before the final selection of a preferred remedial strategy is made. Areas of significant technical uncertainty that should be addressed include: (1) Better delineation of the spatial distribution of surface contamination and the vertical distribution of subsurface contamination in the area of the firing table and associated alluvial deposits; (2) Chemical and physical characterization of residual depleted uranium (DU) at the site; (3) Determination of actual contaminant concentrations in air particulates to support risk modeling; and (4) More realistic estimation of cost for remedial alternatives, including soil washing, that were derived primarily from vendor estimates. Instead of conducting the planned soil washing treatability study, the team recommends that the site consider a new phased approach that combines additional characterization approaches and technologies to address the technical uncertainty in

  20. TECHNICAL EVALUATION OF SOIL REMEDIATION ALTERNATIVES AT THE BUILDING 812 OPERABLE UNIT, LAWRENCE LIVERMORE NATIONAL LABORATORY SITE 300

    Energy Technology Data Exchange (ETDEWEB)

    Eddy-Dilek, C.; Miles, D.; Abitz, R.

    2009-08-14

    The Department of Energy Livermore Site Office requested a technical review of remedial alternatives proposed for the Building 812 Operable Unit, Site 300 at the Lawrence Livermore National Laboratory. The team visited the site and reviewed the alternatives proposed for soil remediation in the draft RI/FS and made the following observations and recommendations. Based on the current information available for the site, the team did not identify a single technology that would be cost effective and/or ecologically sound to remediate DU contamination at Building 812 to current remedial goals. Soil washing is not a viable alternative and should not be considered at the site unless final remediation levels can be negotiated to significantly higher levels. This recommendation is based on the results of soil washing treatability studies at Fernald and Ashtabula that suggest that the technology would only be effective to address final remediation levels higher than 50 pCi/g. The technical review team identified four areas of technical uncertainty that should be resolved before the final selection of a preferred remedial strategy is made. Areas of significant technical uncertainty that should be addressed include: (1) Better delineation of the spatial distribution of surface contamination and the vertical distribution of subsurface contamination in the area of the firing table and associated alluvial deposits; (2) Chemical and physical characterization of residual depleted uranium (DU) at the site; (3) Determination of actual contaminant concentrations in air particulates to support risk modeling; and (4) More realistic estimation of cost for remedial alternatives, including soil washing, that were derived primarily from vendor estimates. Instead of conducting the planned soil washing treatability study, the team recommends that the site consider a new phased approach that combines additional characterization approaches and technologies to address the technical uncertainty in