WorldWideScience

Sample records for superfund site issue

  1. Superfund Sites

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This layer represents active Superfund Sites published by the Environmental Protection Agency (EPA). These data were extracted from the Superfund Enterprise...

  2. Superfund Site Information

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes a number of individual data sets related to site-specific information for Superfund, which is governed under the Comprehensive Environmental...

  3. Stakeholder views of superfund sites

    International Nuclear Information System (INIS)

    English, M.R.

    1992-01-01

    Nearly ten years have passed since the enactment of the federal Comprehensive Response, Compensation, and Liability Act (CERCLA), usually referred to as open-quotes Superfundclose quotes. Nearly four years have passed since CERCLA's major overhaul through the Superfund Amendments and Reauthorization Act (SARA). Although much still remains to be done under Superfund, there is now enough experience to assess how effectively it is working. A study being undertaken by the University of Tennessee's Waste Management Research and Education Institute will supply a portion of that assessment. The study was completed in the fall of 1990. Our study examines two related issues: the resources that will be needed in the coming years to fulfill the mandate of Superfund and other hazardous waste remediation programs, and the site-level experience to date in implementing CERCLA and SARA. This chapter discusses only the open-quotes site-level experienceclose quotes effort, and only its methodological approach. The purpose of the open-quotes site-level experienceclose quotes effort is to explore what counts as a open-quotes successfulclose quotes site in the eyes of different stakeholders in a Superfund cleanup - e.g., the affected community, the potentially responsible parties (PRPs), state and local officials, and the US Environmental Protection Agency (EPA)

  4. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — National Priorities List (NPL) Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access...

  5. Superfund Site Information - Site Sampling Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes Superfund site-specific sampling information including location of samples, types of samples, and analytical chemistry characteristics of...

  6. Superfund National Priority List (NPL) Site Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — A set of site boundaries for each site in EPA Region 1 (Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont) on EPA's Superfund National...

  7. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a selected set of...

  8. Region 9 NPL Sites (Superfund Sites 2013)

    Science.gov (United States)

    NPL site POINT locations for the US EPA Region 9. NPL (National Priorities List) sites are hazardous waste sites that are eligible for extensive long-term cleanup under the Superfund program. Eligibility is determined by a scoring method called Hazard Ranking System. Sites with high scores are listed on the NPL. The majority of the locations are derived from polygon centroids of digitized site boundaries. The remaining locations were generated from address geocoding and digitizing. Area covered by this data set include Arizona, California, Nevada, Hawaii, Guam, American Samoa, Northern Marianas and Trust Territories. Attributes include NPL status codes, NPL industry type codes and environmental indicators. Related table, NPL_Contaminants contains information about contaminated media types and chemicals. This is a one-to-many relate and can be related to the feature class using the relationship classes under the Feature Data Set ENVIRO_CONTAMINANT.

  9. SITE COMPREHENSIVE LISTING (CERCLIS) - Contaminants at CERCLIS (Superfund) Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Contaminants at Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Sites - The CERCLIS Public Access Database...

  10. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - Responsible Parties at CERCLIS Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Responsible Parties at CERCLIS Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access...

  11. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - Non-NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Non-NPL Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a...

  12. Blasting at a Superfund chemical waste site

    International Nuclear Information System (INIS)

    Burns, D.R.

    1991-01-01

    During the summer of 1989, Maine Drilling and Blasting of Gardiner, Maine was contracted by Cayer Corporation of Harvard, Massachusetts to drill and blast an interceptor trench at the Nyanza Chemical Superfund Site in Ashland, Massachusetts. The interceptor trench was to be 1,365 feet long and to be blasted out of granite. The trench was to be 12 feet wide at the bottom with 1/1 slopes, the deepest cut being 30 feet deep. A French drain 12 feet wide by 15 to 35 feet deep was blasted below the main trench on a 2% slope from its center to each end. A French drain is an excavation where the rock is blasted but not dug. The trench would be used as a perimeter road with any ground water flow going through the French drain flowing to both ends of the trench. Being a Superfund project turned a simple blasting project into a regulatory nightmare. The US Environmental Protection Agency performed all the chemical related functions on site. The US Army Corps of Engineers was overseeing all related excavation and construction on site, as was the Massachusetts Department of Environmental Quality Engineering, the local Hazardous Wastes Council, and the local Fire Department. All parties had some input with the blasting and all issues had to be addressed. The paper outlines the project, how it was designed and completed. Also included is an outline of the blast plan to be submitted for approval, an outline of the Safety/Hazardous Waste training and a description of all the problems which arose during the project by various regulatory agencies

  13. Superfund Sites as Anti-landscapes

    DEFF Research Database (Denmark)

    Nye, David

    2017-01-01

    Americans have used a range of narratives to make sense of their settlement and use of natural resources. This article focuses on narratives of environmental degradation after the United States passed legislation mandating the cleanup of toxic sites and provided a Superfund for that purpose. Thre...

  14. Optimization Review: Carson River Mercury Superfund Site, Carson City, Nevada

    Science.gov (United States)

    The Carson River Mercury Site (CRMS) (Figure 1) is located in northwest Nevada and was designated a Superfund site in 1990 because of elevated mercury concentrations observed in surface water, sediments and biota inhabiting the site.

  15. Strategy to Ensure Institutional Control Implementation at Superfund Sites

    Science.gov (United States)

    This document sets forth EPA’s strategy (Strategy) for ensuring that institutional controls (ICs) are successfully implemented at Superfund sites, with an emphasis on evaluating ICs at sites where all construction of all remedies is complete (construction complete sites).

  16. Alternating current electrocoagulation for Superfund site remediation

    International Nuclear Information System (INIS)

    Farrell, C.W.

    1991-01-01

    A study is being conducted by Electro-Pure Systems, Inc. (EPS) under the Emerging Technology portion of the U.S. Environmental Protection Agency's (EPA's) Superfund Innovative Technology Evaluation (SITE) Program to study alternating current electrocoagulation for Superfund site remediation. Alternating current electrocoagulation has proven to be effective in agglomerating and removing colloidal solids, metals and certain organic contaminants from surrogate soils prepared from the US EPA's Synthetic Soil Matrix. Treatments under a wide range of operating conditions have enabled the optimum parameter settings to be established for multiple phase separation. Electrocoagulation enables appreciably enhanced filtration and dewatering rates to be realized for metals- and diesel fuel-spiked surrogate soil slurries; such enhancements are prompted by growth in the mean particle size of the clays and particulates from typically < 10 microns to as much as 150 microns depending on the degree of electrocoagulation. Reduction in the total suspended solids content of clays in all slurries in excess of 90% can routinely be achieved. Bench-scale experiments of the metals-spiked surrogate soils indicate that electrocoagulation preferentially concentrates soluble metals into the sludge phase; excellent metals separation (Pb, Cr, Cu, Cd) can be realized. Experiments on surrogate wastes spiked with volatile organics suggest that this technology is not capable of effecting good volatile extractions from the aqueous phase. Reductions in excess of 80% in the total organic carbon (TOC) content of the diesel fuel-spiked surrogates can, however, be achieved

  17. Feasibility study for the United Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    Lincoff, A.H. [US Environmental Protection Agency, San Francisco, CA (United States). Region IX; Costan, G.P.; Montgomery, M.S.; White, P.J. [Pacific Northwest Lab., Richland, WA (United States)

    1994-07-01

    The United Heckathom Superfund Site in Richmond, California, was used to formulate pesticides from approximately 1947 to 1966. Soils at the site and sediments in the harbor were contaminated with various chlorinated pesticides, primarily DDT, as a result of these activities. The US Environmental Protection Agency listed the site on the Superfund National Priorities List in 1990. This document is part of the Remedial Investigation and Feasibility Study phase of the Superfund response, which will provide the basis for selection of a final remedy that will protect human health and the environment and achieve compliance with federal and state envirorunental laws.

  18. Feasibility study for the United Heckathorn Superfund Site, Richmond, California

    International Nuclear Information System (INIS)

    Lincoff, A.H.

    1994-07-01

    The United Heckathom Superfund Site in Richmond, California, was used to formulate pesticides from approximately 1947 to 1966. Soils at the site and sediments in the harbor were contaminated with various chlorinated pesticides, primarily DDT, as a result of these activities. The US Environmental Protection Agency listed the site on the Superfund National Priorities List in 1990. This document is part of the Remedial Investigation and Feasibility Study phase of the Superfund response, which will provide the basis for selection of a final remedy that will protect human health and the environment and achieve compliance with federal and state envirorunental laws

  19. U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites

    International Nuclear Information System (INIS)

    Carey, Pat; Walker, Stuart

    2008-01-01

    This paper describes the Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities. The Environmental Protection Agency (EPA) implements the Superfund program under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA). From the beginning of the Superfund program, Congress envisioned a role for communities. This role has evolved and expanded during the implementation of the Superfund program. Initially, the CERCLA statute had community involvement requirements designed to inform surrounding communities of the work being done at a site. CERCLA's provisions required 1) development of a community relations plan for each site, 2) establishment of information repositories near each site where all publicly available materials related to the site would be accessible for public inspection, 3) opportunities for the public to comment on the proposed remedy for each site and 4) development of a responsiveness summary responding to all significant comments received on the proposed remedy. In recognition of the need for people living near Superfund sites to be well-informed and involved with decisions concerning sites in their communities, SARA expanded Superfund's community involvement activities in 1986. SARA provided the authority to award Technical Assistance Grants (TAGs) to local communities enabling them to hire independent technical advisors to assist them in understanding technical issues and data about the site. The Superfund Community Involvement Program has sought to effectively implement the statutory community involvement requirements, and to go beyond those requirements to find meaningful ways to involve citizens in the cleanup of sites in their communities. We've structured our program around

  20. Remediation System Evaluation, Savage Municipal Water Supply Superfund Site (PDF)

    Science.gov (United States)

    The Savage Municipal Water Supply Superfund Site, located on the western edge of Milford, New Hampshire, consists of a source area and an extended plume that is approximately 6,000 feet long and 2,500 feet wide.

  1. Chromosomal aberrations in Sigmodon hispidus from a Superfund site

    International Nuclear Information System (INIS)

    Bowers, B.; McBee, K.; Lochmiller, R.; Burks, S.; Qualls, C.

    1995-01-01

    Cotton rats (Sigmodon hispidus) were collected from an EPA Superfund site located on an abandoned oil refinery. Three trapping grids were located on the refinery and three similar grids were located at uncontaminated localities which served as reference sites. Bone marrow metaphase chromosome preparations were examined for chromosomal damage. For each individual, 50 cells were scored for six classes of chromosomal lesions. For the fall 1991 trapping period, mean number of aberrant cells per individual was 2.33, 0.85, and 1.50 for the three Superfund grids., Mean number of aberrant cells per individual was 2.55, 2.55, and 2.12 from the reference grids. Mean number of lesions per cell was 2.77, 0.86, and 1.9 from the Superfund grids, and 3.55, 2.77, and 2.50 from the reference grids. For the spring 1992 trapping period, more damage was observed in animals from both Superfund and reference sites; however, animals from Superfund grids had more damage than animals from reference grids. Mean number of aberrant cells per individual was 3.50, 3.25, and 3.70 from the Superfund grids, and 2.40, 2.11, and 1.40 from the reference grids. Mean number of lesions per cell was 4.80, 4.25, and 5.50 from the Superfund grids, and 2.60, 2.33, and 1.50 from the reference grids. These data suggest animals may be more susceptible to chromosomal damage during winter months, and animals from the Superfund grids appear to be more severely affected than animals from reference grids

  2. Centredale Manor Superfund Site in Rhode Island included on EPA List of Targeted for Immediate Attention

    Science.gov (United States)

    Today, the U.S. Environmental Protection Agency released the list of Superfund sites that Administrator Pruitt has targeted for immediate and intense attention. The Centredale Manor Restoration Project superfund site is one of the 21 sites on the list.

  3. 78 FR 23563 - LWD, Inc. Superfund Site; Calvert City, Marshall County, Kentucky; Notice of Settlement

    Science.gov (United States)

    2013-04-19

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9805-2; CERCLA-04-2013-3751] LWD, Inc. Superfund Site... costs concerning the LWD, Inc., Superfund Site located in Calvert City, Marshall County, Kentucky. The... V. Painter. Submit your comments by Site name LWD, Inc., Superfund Site by one of the following...

  4. 78 FR 14543 - Ward Transformer Superfund Site; Raleigh, Wake County, NC; Notice of Settlement

    Science.gov (United States)

    2013-03-06

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL 9788-2; CERCLA-04-2013-3754] Ward Transformer Superfund Site... Ward Transformer Superfund Site located in Raleigh, Wake County, North Carolina. Under the terms of the.... Submit your comments by Site name Ward Transformer Superfund Site by one of the following methods: [[Page...

  5. Remediation System Evaluation, Douglas Road Landfill Superfund Site

    Science.gov (United States)

    The Douglas Road Landfill Superfund Site is located in St. Joseph County just north of Mishawaka,Indiana. The site consists of a 16-acre capped landfill located on an approximately 32-acre lot (includingthe land purchased in 1999 for a wetlands...

  6. DECISION ANALYSIS OF INCINERATION COSTS IN SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This study examines the decision-making process of the remedial design (RD) phase of on-site incineration projects conducted at Superfund sites. Decisions made during RD affect the cost and schedule of remedial action (RA). Decision analysis techniques are used to determine the...

  7. Superfund tio videos: Set A. Overview of superfund, response activities and responsibilities, site discovery, notification, and evaluation. Part 1. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into three sections. Section 1 discusses the development and framework of CERCLA and the Superfund Program and outlines the implementing rules that guide Superfund site cleanups. The Superfund response actions - remedial, removal, and enforcement - are reviewed. Section 2 outlines On-Scene Coordinator's (OSC) and Remedial Project Manager's (RPM) roles and responsibilities in Superfund removal, remedial, and enforcement activities. The other players involved in Superfund response activities also are identified. Section 3 describes how EPA learns of potential Superfund sites and lists the authorities that determine the requirements for site discovery. The procedures used to prioritize the sites and to identify and select sites for remediation are discussed

  8. Cleanups In My Community (CIMC) - Superfund National Priority List (NPL) Sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Superfund National Priority List Sites as part of the CIMC web service. Superfund is a program administered by the EPA to locate,...

  9. Case history: Vertical barrier wall system for Superfund Site

    International Nuclear Information System (INIS)

    Koelling, M.A.; Kovac, C.P.; Norris, J.E.

    1997-01-01

    Design considerations and construction aspects are presented for the installation of a vertical barrier wall system for the Boeing Company at a Superfund Site near Seattle, WA. The construction was performed during 1996. The vertical barrier wall system included: (1) a soil-bentonite (SB) slurry wall, approximately 670 meters (2200 feet) in length, ranging from 12 to 21 meters (40 to 70 feet) in depth; (2) expansion of a cover system over the area enclosed by the SB wall; and (3) surface drainage improvements. Design and construction of the system addressed requirements of a Consent Decree for the site issued in 1993. The paper discusses the development of the design to meet remedial performance goals of preventing migration of contaminants in the soil/groundwater system and aiding aquifer restoration. Secondly, the paper details installation of the SB wall, highlighting the more significant construction issues, which included excavation of the wall through glacially deposited cobbles/boulders/till as well as addressing the severe elevation changes along the wall alignment. Thirdly, the paper presents Quality Assurance (QA) monitoring and testing performed during the construction phase

  10. U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites

    International Nuclear Information System (INIS)

    Martin, K.; Walker, St.

    2009-01-01

    This paper describes the EPA Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities, and what lessons have been learned by EPA when trying to conduct meaningful community involvement at sites. In addition, it discusses tools that EPA has designed to specifically enhance community involvement at radioactively contaminated Superfund sites. In summary, the Superfund program devotes substantial resources to involving the local community in the site cleanup decision making process. We believe community involvement provides us with highly valuable information that must be available to carefully consider remedial alternatives at a site. We also find our employees enjoy their jobs more. Rather than fighting with an angry public they can work collaboratively to solve the problems created by the hazardous waste sites. We have learned the time and resources we devote at the beginning of a project to developing relationships with the local community, and learning about their issues and concerns is time and resources well spent. We believe the evidence shows this up-front investment helps us make better cleanup decisions, and avoids last minute efforts to work with a hostile community who feels left out of the decision-making process. (authors)

  11. Superfund Removal Site Points, Region 9, 2012, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of CERCLA (Superfund) Removal sites. CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act)...

  12. EPA [Environmental Protection Agency] SITE [Superfund Innovative Technology Evaluation] program seeks technology proposals

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    EPA will issue an RFP to initiate the SITE-005 solicitation for demonstration of technologies under the Superfund Innovative Technology Evaluation (SITE) Program. This portion of the SITE program offers a mechanism for conducting a joint technology demonstration between EPA and the private sector. The goal of the demonstration program is to provide an opportunity for developers to demonstrate the performance of their technologies on actual hazardous wastes at Superfund sites, and to provide accurate and reliable data on that performance. Technologies selected must be of commercial scale and provide solutions to problems encountered at Superfund Sites. Primary emphasis in the RFP is on technologies that address: treatment of mixed, low level radioactive wastes in soils and groundwater; treatment of soils and sludges contaminated with organics and/or inorganics, materials handling as a preliminary step to treatment or further processing, treatment trains designed to handle specific wastes, are in situ technologies, especially those processes providing alternatives to conventional groundwater pump and treat techniques

  13. 77 FR 11533 - Anniston PCB Superfund Site, Anniston, Calhoun County, Alabama; Notice of Amended Settlement

    Science.gov (United States)

    2012-02-27

    ... ENVIRONMENTAL PROTECTION AGENCY [CERCLA-04-2012-3763; FRL 9637-7] Anniston PCB Superfund Site... past response costs concerning the Anniston PCB Superfund Site located in Anniston, Calhoun County.... Submit your comments by Site name Anniston PCB by one of the following methods: www.epa.gov/region4...

  14. 77 FR 16548 - Florida Petroleum Reprocessors Superfund Site; Davie, Broward County, FL; Notice of Settlements

    Science.gov (United States)

    2012-03-21

    ...-2012- 3766; CERCLA-04-2012-3765] Florida Petroleum Reprocessors Superfund Site; Davie, Broward County... costs concerning the Florida Petroleum Reprocessors Superfund Site located in Davie, Broward County.... Painter. Submit your comments by Site name Florida Petroleum Reprocessors by one of the following methods...

  15. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    Science.gov (United States)

    This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse and redevelopment of BRAC federal properties. When the BRAC program began in the early 1990s, EPA worked with DoD and the states to identify uncontaminated areas and these parcels were immediately made available for reuse. Since then EPA has worked with DoD to clean up the contaminated portions of bases. These are usually parcels that were training ranges, landfills, maintenance facilities and other past waste-disposal areas. Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned.This data layer shows Superfund Sites that are located at BRAC Federal Facilities. Additional Superfund sites and other BRAC sites (those that are not Superfund sites) are included in other data layers as part of this web service.BRAC Superfund Sites shown in this web service are derived from the epa.gov website and include links to the relevant web pages within the attribute table. Data about BRAC Superfund Sites are located on their own EPA web pages, and CIMC links to those pages. The CIMC web service

  16. Restoration principles and criteria: superfund program policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Walker, Stuart

    2006-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) is responsible for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund'. The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund program. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in a consistent manner as with chemical contamination, except to account for the technical differences between radionuclides and chemicals. This consistency is important since at every radioactively contaminated site being addressed under Superfund's primary program for long-term cleanup, the National Priorities List (NPL), chemical contamination is also present. (author)

  17. Remediation System Evaluation, McCormick and Baxter Superfund SiteRemediation System Evaluation, McCormick and Baxter Superfund Site

    Science.gov (United States)

    The McCormick and Baxter Creosoting Company, Portland Plant, Superfund Site is located adjacent tothe Willamette River in Portland, Oregon and addresses contamination of soil, groundwater, and riversediments stemming from creosoting operations...

  18. 40 CFR 35.4040 - How many groups can receive a TAG at one Superfund site?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false How many groups can receive a TAG at one Superfund site? 35.4040 Section 35.4040 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Eligible? § 35.4040 How many groups can receive a TAG at one Superfund site? (a) Only one TAG may be...

  19. SHIRCO PILOT-SCALE INFRARED INCINERATION SYSTEM AT THE ROSE TOWNSHIP DEMODE ROAD SUPERFUND SITE

    Science.gov (United States)

    Under the Superfund Innovative Technology Evaluation or SITE Program, an evaluation was made of the Shirco Pilot-Scale Infrared Incineration System during 17 separate test runs under varying operating conditions. The tests were conducted at the Demode Road Superfund site in Ros...

  20. 78 FR 729 - Ellman Battery Superfund Site; Orlando, Orange County, FL; Notice of Settlement

    Science.gov (United States)

    2013-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9767-6; CERCLA-04-2012-3780] Ellman Battery Superfund Site; Orlando, Orange County, FL; Notice of Settlement AGENCY: Environmental Protection Agency (EPA). ACTION... Action at the Ellman Battery Superfund Site located in Orlando, Orange County, Florida. DATES: The Agency...

  1. Superfund impasse

    International Nuclear Information System (INIS)

    Dowd, R.M.

    1988-01-01

    EPA recently reported to Congress on the status of the Superfund program. A review of the report reveals that Superfund is a costly, slow-moving juggernaut that consumes an ever-growing share of resources and threatens to overwhelm other, more pressing environmental issues. EPA was given a broad mandate to clean up hazardous-waste sites when Congress enacted the Comprehensive Environmental Response. Compensation, and Liability Act in 1980 and established a $1.6 billion appropriation for a Superfund. In 1986 Congress extended the program for another five years and added $8.5 billion to complete the job-an overly optimistic estimate, as we shall see. Superfund is a huge program; the inventory of potentially hazardous waste sites is large and growing quickly. By the end of fiscal year 1987, EPA's inventory listed 27,571 hazardous-waste sites,and this number is increasing steadily at a rate of about 2500 each year. The General Accounting Office suggests that there may be as many as 150,000 such sites

  2. Renton's Quendall Terminals on List of EPA Superfund Sites Targeted for Immediate, Intense Attention

    Science.gov (United States)

    EPA released the list of Superfund sites that Administrator Pruitt has targeted for intense and immediate attention, including the Quendall Terminals Site, a former creosote facility on the shore of Lake Washington in Renton, Washington.

  3. Remediation of the Wells G & H Superfund Site, Woburn, Massachusetts.

    Science.gov (United States)

    Bair, E Scott; Metheny, Maura A

    2002-01-01

    Remediation of ground water and soil contamination at the Wells G & H Superfund Site, Woburn, Massachusetts, uses technologies that reflect differences in hydrogeologic settings, concentrations of volatile organic compounds (VOCs), and costs of treatment. The poorly permeable glacial materials that overlie fractured bedrock at the W.R. Grace property necessitate use of closely spaced recovery wells. Contaminated ground water is treated with hydrogen peroxide and ultraviolet (UV) oxidation. At UniFirst, a deep well completed in fractured bedrock removes contaminated ground water, which is treated by hydrogen peroxide, UV oxidation, and granular activated carbon (GAC). The remediation system at Wildwood integrates air sparging, soil-vapor extraction, and ground water pumping. Air stripping and GAC are used to treat contaminated water; GAC is used to treat contaminated air. New England Plastics (NEP) uses air sparging and soil-vapor extraction to remove VOCs from the unsaturated zone and shallow ground water. Contaminated air and water are treated using separate GAC systems. After nine years of operation at W.R. Grace and UniFirst, 30 and 786 kg, respectively, of VOCs have been removed. In three years of operation, 866 kg of VOCs have been removed at Wildwood. In 15 months of operation, 36 kg of VOCs were removed at NEP. Characterization work continues at the Olympia Nominee Trust, Whitney Barrel, Murphy Waste Oil, and Aberjona Auto Parts properties. Risk assessments are being finalized that address heavy metals in the floodplain sediments along the Aberjona River that are mobilized from the Industri-Plex Superfund Site located a few miles upstream.

  4. A method for estimating the local area economic damages of Superfund waste sites

    International Nuclear Information System (INIS)

    Walker, D.R.

    1992-01-01

    National Priority List (NPL) sites, or more commonly called Superfund sites, are hazardous waste sites (HWS) deemed by the Environmental Protection Agency (EPA) to impose the greatest risks to human health or welfare or to the environment. HWS are placed and ranked for cleanup on the NPL based on a score derived from the Hazard Ranking System (HRS), which is a scientific assessment of the health and environmental risks posed by HWS. A concern of the HRS is that the rank of sites is not based on benefit-cost analysis. The main objective of this dissertation is to develop a method for estimating the local area economic damages associated with Superfund waste sites. Secondarily, the model is used to derive county-level damage estimates for use in ranking the county level damages from Superfund sites. The conceptual model used to describe the damages associated with Superfund sites is a household-firm location decision model. In this model assumes that households and firms make their location choice based on the local level of wages, rents and amenities. The model was empirically implemented using 1980 census microdata on households and workers in 253 counties across the US. The household sample includes data on the value and structural characteristics of homes. The worker sample includes the annual earnings of workers and a vector worker attributes. The microdata was combined with county level amenity data, including the number of Superfund sites. The hedonic pricing technique was used to estimate the effect of Superfund sites on average annual wages per household and on monthly expenditures on housing. The results show that Superfund sites impose statistically significant damages on households. The annual county damages from Superfund sites for a sample of 151 counties was over 14 billion dollars. The ranking of counties using the damage estimates is correlated with the rank of counties using the HRS

  5. Superfund and Toxic Release Inventory Sites - MDC_ContaminatedSite

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — A point feature class of open DERM Contaminated sites - see phase code for status of site. Contaminated sites identifies properties where environmental contamination...

  6. Remedial design services for Montclair/West Orange and Glen Ridge Superfund sites

    International Nuclear Information System (INIS)

    Urbaniak, T.F.; Tomiczek, P.W. Jr.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites are located 12 miles west of New York City in Essex County, New Jersey. The sites are contaminated with waste materials from radium-processing facilities which operated in the area during the early 1900's. The waste materials, containing radium and other radioactive isotopes were placed in three separate landfill sites. Major public health risks are indoor radon gas build-up and indoor/ outdoor gamma radiation. In 1989, the EPA issued a Record of Decision (ROD) which chose excavation and off-site disposal of material as the preferred alternative. The purpose of this presentation is to highlight key elements of the design process for the remedial action at Montclair. Those key elements are as follows: meeting community relations challenges; measuring radioactive contamination; developing plans and specifications; packaging of remedial action contacts; and continually improving both the process and the designs

  7. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse...

  8. Cleanups In My Community (CIMC) - Federal facilities that are also Superfund sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — Federal facilities are properties owned by the federal government. This data layer provides access to Federal facilities that are Superfund sites as part of the CIMC...

  9. Restoration principles and criteria: Superfund programme policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Shapiro, M.

    2000-01-01

    The Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response is responsible for implementing two key US laws regulating waste management and cleanup: the Resource Conservation and Recovery Act, and the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed ''Superfund''. The purpose of the Superfund programme is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund programme. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in the identical way as chemical contamination. (author)

  10. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  11. Report: Remedial Project Manager Turnover at Superfund Sites

    Science.gov (United States)

    Report #2001-M-000015, June 15, 2001. We determined that EPA Region III did not have formal procedures in place to mitigate continuity problems caused by turnover of EPA personnel in the Superfund program.

  12. Superfund Technology Evaluation Report: SITE Program Demonstration Test Shirco Pilot-Scale Infrared Incineration System at the Rose Township Demode Road Superfund Site Volume I

    Science.gov (United States)

    The Shirco Pilot-Scale Infrared Incineration System was evaluated during a series of seventeen test runs under varied operating conditions at the Demode Road Superfund Site located in Rose Township, Michigan. The tests sought to demonstrate the effectiveness of the unit and the t...

  13. Phase I Source Investigation, Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, Nancy P; Evans, Nathan R

    2002-12-18

    This report represents Phase I of a multi-phase approach to a source investigation of DDT at the Heckathorn Superfund Site, Richmond, California, the former site of a pesticide packaging plant, and the adjacent waterway, the Lauritzen Channel. Potential identified sources of contamination were from sloughed material from undredged areas (such as side banks) and from outfall pipes. Objectives of Phase I included the (1) evaluation of pesticide concentrations associated with discharge from outfalls, (2) identification of additional outfalls in the area, (3) identification of type, quantity, and distribution of sediment under the Levin pier, (4) quantification of pesticide concentrations in sediment under the pier, and (5) evaluation of sediment structure and slope stability under the pier. Field operations included the collection of sediment directly from inside the mouths of outfall pipes, when possible, or the deployment of specially designed particle traps where direct sampling was problematic. Passive water samplers were placed at the end of known outfall pipes and analyzed for DDT and other pesticides of concern. Underwater dive surveys were conducted beneath the Levin pier to document type, slope, and thickness of sediment. Samples were collected at locations of interest and analyzed for contaminants. Also sampled was soil from bank areas, which were suspected of potentially contributing to continued DDT contamination of the Lauritzen Channel through erosion and groundwater leaching. The Phase I Source Investigation was successful in identifying significant sources of DDT contamination to Lauritzen Channel sediment. Undredged sediment beneath the Levin pier that has been redistributed to the channel is a likely source. Two outfalls tested bear further investigation. Not as well-defined are the contributions of bank erosional material and groundwater leaching. Subsequent investigations will be based on the results of this first phase.

  14. Optimization Evaluation: Lee Chemical Superfund Site, City Of Liberty, Clay County, Missouri

    Science.gov (United States)

    The Lee Chemical Superfund Site (site) is located along Missouri Highway 210 in Liberty, Missouri, approximately 15 miles east of Kansas City, Missouri. Currently, the site is a vacant lot of approximately2.5 acres in a flat alluvial plain.

  15. 78 FR 47317 - Ore Knob Mine Superfund Site; Laurel Springs, Ashe County, North Carolina; Notice of Settlement

    Science.gov (United States)

    2013-08-05

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9843-3; CERCLA-04-2013-3759] Ore Knob Mine Superfund Site; Laurel Springs, Ashe County, North Carolina; Notice of Settlement AGENCY: Environmental Protection Agency... settlement with Herbert N. Francis concerning the Ore Knob Mine Superfund Site located in Laurel Springs...

  16. 75 FR 81269 - Ward Transformer Superfund Site Raleigh, Wake County, NC; Notice of Settlements

    Science.gov (United States)

    2010-12-27

    ... ENVIRONMENTAL PROTECTION AGENCY [Docket EPA-RO4-SFUND-2010-1053, FRL-9243-2] Ward Transformer... entered into a five settlements for reimbursement of past response costs concerning the Ward Transformer... Docket ID No. EPA-RO4- SFUND-2010-1053 or Site name Ward Transformer Superfund Site by one of the...

  17. 77 FR 13603 - Anniston PCB Superfund Site; Anniston, Calhoun County, AL; Correction

    Science.gov (United States)

    2012-03-07

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9644-2; CERCLA-04-2012-3763] Anniston PCB Superfund Site... FR 11533 (FRL-9637-7), EPA posted a Notice of Amended Settlement concerning the Anniston PCB... the settlement are available from Ms. Paula V. Painter. Submit your comments by Site name Anniston PCB...

  18. Remediation System Evaluation, Tutu Wellfield Superfund Site, St. Thomas, U.S. Virgin Islands

    Science.gov (United States)

    The Tutu Wellfield Superfund Site is a 1.5 square mile site located on the eastern end of St. Thomas, U.S. Virgin Islands (USVI) within the upper Turpentine Run surface drainage basin in the Anna’s Retreat area.

  19. 75 FR 53694 - Florida Petroleum Reprocessors Superfund Site; Davie, Broward County, FL; Notice of Settlement

    Science.gov (United States)

    2010-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY [Docket EPA-RO4-SFUND-2010-0729, FRL-9196-1] Florida Petroleum... entered into a settlement for reimbursement of past response costs concerning the Florida Petroleum... No. EPA-RO4- SFUND-2010-0729 or Site name Florida Petroleum Reprocessors Superfund Site by one of the...

  20. Assessment of technologies for the remediation of radioactively contaminated Superfund sites

    International Nuclear Information System (INIS)

    1990-01-01

    The report is a screening evaluation of information needs for the development of generic treatability studies for the remediation of Superfund Radiation Sites on the National Priorities List (NPL). It presents a categorization of the 25 radiation sites currently proposed or listed on the NPL, and provides a rating system for evaluating technologies that may be used to remediate these sites. It also identifies gaps in site assessment and technology data and provides information about and recommendations for technology development

  1. Superfund record of decision (EPA Region 7): Cherokee County Superfund Site, Cherokee County, KS, July 29, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The decision document presents the selected remedial action for the mining wastes at Operable Unit No. 07 of the Galena Subsite, which is part of the Cherokee County Superfund Site in Cherokee County, Kansas. The selected remedy includes actions for residential soils impacted by mining wastes and includes: Excavation and disposal of residential soils impacted by mining wastes; Health education for the general community and medical professionals; Institutional controls to guide future development in residential areas impacted by mining wastes; Treatability studies to evaluate the effectiveness of phosphate stabilization as a future alternative; and Operation and maintenance of all remedy aspects including, but not limited to, health education, institutional controls, and long-term monitoring.

  2. Private-Sector Cleanup Expenditures and Transaction Costs at 18 Superfund Sites (1993)

    Science.gov (United States)

    Superfund allows the government either to clean up a site and recover its cost from the potentially responsible parties (PRPs) or to require the PRPs to undertake the cleanup themselves. This study examines private-sector expenditures and transaction-costs

  3. 78 FR 76143 - Proposed CERCLA Settlement Relating to the Paul's Tank Cleaning Service Superfund Site...

    Science.gov (United States)

    2013-12-16

    ... Paul's Tank Cleaning Service Superfund Site, Burlington County, New Jersey AGENCY: Environmental.... (``Settling Party''). The Settling Party is a potentially responsible party, pursuant to Section 107(a) of CERCLA, and thus is potentially liable for response costs incurred at or in connection Paul's Tank...

  4. A General Chemistry Assignment Analyzing Environmental Contamination for the Depue, IL, National Superfund Site

    Science.gov (United States)

    Saslow Gomez, Sarah A.; Faurie-Wisniewski, Danielle; Parsa, Arlen; Spitz, Jeff; Spitz, Jennifer Amdur; Loeb, Nancy C.; Geiger, Franz M.

    2015-01-01

    The classroom exercise outlined here is a self-directed assignment that connects students to the environmental contamination problem surrounding the DePue Superfund site. By connecting chemistry knowledge gained in the classroom with a real-world problem, students are encouraged to personally connect with the problem while simultaneously…

  5. Geochemical Characteristics of TP3 Mine Wastes at the Elizabeth Copper Mine Superfund Site, Orange County, Vermont

    Science.gov (United States)

    Hammarstrom, Jane M.; Piatak, Nadine M.; Seal, Robert R.; Briggs, Paul H.; Meier, Allen L.; Muzik, Timothy L.

    2003-01-01

    Remediation of the Elizabeth mine Superfund site in the Vermont copper belt poses challenges for balancing environmental restoration goals with issues of historic preservation while adopting cost-effective strategies for site cleanup and long-term maintenance. The waste-rock pile known as TP3, at the headwaters of Copperas Brook, is especially noteworthy in this regard because it is the worst source of surface- and ground-water contamination identified to date, while also being the area of greatest historical significance. The U.S. Geological Survey (USGS) conducted a study of the historic mine-waste piles known as TP3 at the Elizabeth mine Superfund site near South Strafford, Orange County, VT. TP3 is a 12.3-acre (49,780 m2) subarea of the Elizabeth mine site. It is a focus area for historic preservation because it encompasses an early 19th century copperas works as well as waste from late 19th- and 20th century copper mining (Kierstead, 2001). Surface runoff and seeps from TP3 form the headwaters of Copperas Brook. The stream flows down a valley onto flotation tailings from 20th century copper mining operations and enters the West Branch of the Ompompanoosuc River approximately 1 kilometer downstream from the mine site. Shallow drinking water wells down gradient from TP3 exceed drinking water standards for copper and cadmium (Hathaway and others, 2001). The Elizabeth mine was listed as a Superfund site in 2001, mainly because of impacts of acid-mine drainage on the Ompompanoosuc River.

  6. Value engineering study for seletion of verticle barrier technology at a Superfund site

    International Nuclear Information System (INIS)

    Bryan, E.E.; Guglielmetti, J.L.; Butler, P.B.; Brill, M.P.

    1997-01-01

    A value engineering (VE) study was conducted to identify and evaluate vertical barrier technologies and alignments for a Superfund project in New Castle County, Delaware. The objective was to select and recommend the most appropriate vertical barrier(s) for two separate landfills and a portion of the manufacturing plant on the site. A VE team was assembled to identify and evaluate site specific issues related to effectiveness, constructability and cost for numerous vertical barrier technologies. Several cost-effective alternatives were identified that met project objectives. The VE study concluded that a composite vertical barrier system consisting of a soil-bentonite slurry trench and steel sheet piles would provide effective containment of the North Landfill. Additionally, the geologic confining unit specified in the Record of Decision (ROD) was found to be unsuitable as a vertical barrier key and a more suitable, shallow confining unit was discovered. This paper describes the value engineering process and results of the VE study for one of the landfills

  7. Biomonitoring for metal contamination near two Superfund sites in Woburn, Massachusetts, using phytochelatins

    International Nuclear Information System (INIS)

    Gawel, James E.; Hemond, Harold F.

    2004-01-01

    Characterizing the spatial extent of groundwater metal contamination traditionally requires installing sampling wells, an expensive and time-consuming process in urban areas. Moreover, extrapolating biotic effects from metal concentrations alone is problematic, making ecological risk assessment difficult. Our study is the first to examine the use of phytochelatin measurements in tree leaves for delimiting biological metal stress in shallow, metal-contaminated groundwater systems. Three tree species (Rhamnus frangula, Acer platanoides, and Betula populifolia) growing above the shallow groundwater aquifer of the Aberjona River watershed in Woburn, Massachusetts, display a pattern of phytochelatin production consistent with known sources of metal contamination and groundwater flow direction near the Industri-Plex Superfund site. Results also suggest the existence of a second area of contaminated groundwater and elevated metal stress near the Wells G and H Superfund site downstream, in agreement with a recent EPA ecological risk assessment. Possible contamination pathways at this site are discussed

  8. Long-Term Groundwater Monitoring Optimization, Clare Water Supply Superfund Site, Permeable Reactive Barrier and Soil Remedy Areas, Clare, Michigan

    Science.gov (United States)

    This report contains a review of the long-term groundwater monitoring network for the Permeable Reactive Barrier (PRB) and Soil Remedy Areas at the Clare Water Supply Superfund Site in Clare, Michigan.

  9. HISTORY AND ACCOMPLISHMENTS OF THE US EPA'S SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION (SITE) MONITORING AND MEASUREMENT (MMT) PROGRAM

    Science.gov (United States)

    This manuscript presents the history and evolution of the U.S. Environmental Protection Agency's (EPA) Superfund Innovative Technology Evaluation (SITE) Monitoring and Measurement Technology (MMT) Program. This includes a discussion of how the fundamental concepts of a performanc...

  10. Issuance of Final Guidance: Ecological Risk Assessment and Risk Management Principles for Superfund Sites, October 7, 1999

    Science.gov (United States)

    This guidance is intended to help Superfund risk managers make ecological risk management decisions that are based on sound science, consistent across Regions, and present a characterization of site risks that is transparent to the public.

  11. Case studies of community relations on DOE's Formerly Utilized Sites Remedial Action Program as models for Superfund sites

    International Nuclear Information System (INIS)

    Plant, S.W.; Adler, D.G.

    1995-01-01

    Ever since the US Department of Energy (DOE) created its Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974, there has been a community relations program. The community relations effort has grown as FUSRAP has grown. With 20 of 46 sites now cleaned up, considerable experience in working with FUSRAP stakeholders has been gained. Why not share that experience with others who labor on the Superfund sites? Many similarities exist between the Superfund sites and FUSRAP. FUSRAP is a large, multiple-site environmental restoration program. The challenges range from small sites requiring remedial actions measurable in weeks to major sites requiring the full remedial investigation/feasibility study process. The numerous Superfund sites throughout the United States offer the same diversity, both geographically and technically. But before DOE offers FUSRAP's community relations experience as a model, it needs to make clear that this will be a realistic model. As experiences are shared, DOE will certainly speak of the efforts that achieved its goals. But many of the problems that DOE encountered along the way will also be related. FUSRAP relies on a variety of one- and two-way communication techniques for involving stakeholders in the DOE decision-making process. Some of the techniques and experiences from the case studies are presented

  12. Fifteen years of Superfund at South Valley: Reengineering required

    International Nuclear Information System (INIS)

    Cormier, J.; Horak, F.

    1995-01-01

    It is no surprise to many of Superfund's practitioners that the law and its application are flawed. The South Valley Superfund Site in Albuquerque, New Mexico has not escaped Superfund's problems. The problems and issues arising out of the South Valley Superfund site have spurred the desire to seek a better way to administer and manage cleanup. This new method applies organizational and role changes that bring Superfund closer to an efficient business-like entity. This ''Reengineered'' Superfund strives for reorganization, contractor reduction, improved communication, reporting reduction, and teaming. In addition, modifications are made to the roles of regulators, potentially responsible parties (PRPs), and the public. Today the site encompasses roughly one square mile in area, includes six identified contaminant sources, and deals with solvent and petroleum by-product contamination

  13. Electrochemical peroxidation of PCBs and VOCs in superfund site water and sediments

    Energy Technology Data Exchange (ETDEWEB)

    Scrudato, R.J.; Chiarenzelli, J.R. [SUNY, Oswego, NY (United States)

    1996-12-31

    An electrochemical peroxidation (ECP) process has been developed and used to degrade polychlorinated biphenyls (PCB) and volatile organic compounds (VOC)-contaminated water, sludge, and sediments at a New York State Federal and State Superfund Site. The process involves passing an oscillating low-amperage (<10 amps) current through steel electrodes immersed in an acidified water or sediment slurry into which hydrogen peroxide (<1,000 ppm) is added. The generated free radicals attack organic compounds, including organo-metallic complexes and refractory compounds including PCBs. PCB degradation ranged from about 30% to 80% in experiments involving Federal Superfund Site sediments; total PCBs were reduced by {approximately}97% to 68%, respectively, in water and slurry collected from a State Superfund subsurface storage tank. VOC bench-scale experiments involved chloroethane, 1,1-dichloroethane, dichloromethane, 1,1,1-trichloroethane, and acetone and after a 3-min ECP treatment, degradation ranged from >94% to about 99.9%. Results indicate the ECP is a viable process to degrade organic contaminants in water and sediment suspensions. Because the treated water suspensions are acidified, select trace metal sorbed to the particulates is solubilized and therefore can be segregated from the particulates, offering a process that simultaneously degrades organic contaminants and separates trace metals. 19 refs., 1 fig., 4 tabs.

  14. Aquatic assessment of the Ely Copper Mine Superfund site, Vershire, Vermont

    Science.gov (United States)

    Seal, Robert R.; Kiah, Richard G.; Piatak, Nadine M.; Besser, John M.; Coles, James F.; Hammarstrom, Jane M.; Argue, Denise M.; Levitan, Denise M.; Deacon, Jeffrey R.; Ingersoll, Christopher G.

    2010-01-01

    The Ely Mine, which operated from 1821 to 1905, and its area of downstream impact constitute the Ely Copper Mine Superfund site. The site was placed on the National Priorities List in 2001. The mine comprises underground workings, foundations from historical structures, several waste-rock piles, roast beds associated with the smelting operation, and slag piles resulting from the smelting. The mine site is drained by Ely Brook, which includes several tributaries, one of which drains a series of six ponds. Ely Brook empties into Schoolhouse Brook, which flows 3.3 kilometers and joins the Ompompanoosuc River.

  15. Superfund at work: Hazardous waste cleanup efforts nationwide, spring 1993 (Radium Chemical Site profile, Queens, New York)

    International Nuclear Information System (INIS)

    1993-01-01

    The Radium Chemical hazardous waste site in Queens, New York was contaminated with radium, posing a grave potential threat to the community. The US Environmental Protection Agency (EPA) used the Superfund program to design a long-term cleanup for the site using input from citizens and the business community. Superfund staff: Mobilized a quick cleanup action to remove 10,000 small containers of radium; Developed a streamlined approach to long-term cleanup; Secured the site to reduce the possibility of radiation exposure to the local residents; Cooperated with the community to design a well-organized emergency response plan; and Educated local citizens about site hazards, incorporating community concerns into the cleanup process. The Radium Chemical site is a clear example of EPA's effective management and problem-solving strategies at Superfund sites

  16. EPA RREL's mobile volume reduction unit advances soil washing at four Superfund sites

    International Nuclear Information System (INIS)

    Gaire, R.; Borst, M.

    1994-01-01

    Research testing of the US. Environmental Protection Agency (EPA) Risk Reduction Engineering Laboratory's (RREL) Volume Reduction Unit (VRU), produced data helping advance soil washing as a remedial technology for contaminated soils. Based on research at four Superfund sites, each with a different matrix of organic contaminants, EPA evaluated the soil technology and provided information to forecast realistic, full-scale remediation costs. Primarily a research tool, the VRU is RREL's mobile test unit for investigating the breadth of this technology. During a Superfund Innovative Technology Evaluation (SITE) Demonstration at Escambia Wood Treating Company Site, Pensacola, FL, the VRU treated soil contaminated with pentachlorophenol (PCP) and polynuclear aromatic hydrocarbon-laden creosote (PAH). At Montana Pole and Treatment Plant Site, Butte, MT, the VRU treated soil containing PCP mixed with diesel oil (measured as total petroleum hydrocarbons) and a trace of dioxin. At Dover Air Force Base Site, Dover, DE, the VRU treated soil containing JP-4 jet fuel, measured as TPHC. At Sand Creek Site, Commerce City, CO, the feed soil at this site was contaminated with two pesticides: heptachlor and dieldrin. Less than 10 percent of these pesticides remained in the treated coarse soil fractions

  17. A brownfield to greenfield success story: Denver Radium Superfund Site

    International Nuclear Information System (INIS)

    Baracani, E.; Bruskin, L.J.

    1996-01-01

    The Denver Radium Site consists of forty-nine separate sites divided into 11 operable units throughout the city of Denver, Colorado. The sites contained radioactive soils and residues (310,000 tons) from processing of radium in the early 1900s. The majority of the radioactive material was removed, transported by rail, and disposed offsite in Utah. During radiologic cleanup at the former Robinson Brick Company Site (ROBCO), (OU No. 4/5), metal contaminated soils from previous smelting operations were encountered. The Denver Radium Site was placed on the National Priorities List (NPL), and through cooperation of private parties, the state and federal governments, the land was cleaned up and restored to productive use

  18. 1992 update of US EPA's Superfund Innovative Technology Evaluation (SITE) Emerging Technology Program

    International Nuclear Information System (INIS)

    Lewis, N.M.; Barkley, N.P.; Williams, T.

    1992-01-01

    The Superfund Innovative Technology Evaluation (SITE) Emerging Technology Program (ETP) has financially supported further development of bench- and pilot-scale testing and evaluation of innovative technologies for use at hazardous waste sites for five years. The ETP was established under the Superfund Amendments and Reauthorization Act (SARA) of 1986. The ETP complies with the goal of the SITE Program to promote, accelerate and make commercially available the development of alternative/innovative treatment technologies for use at Superfund sites. Technologies are submitted to the ETP through yearly solicitations for Preproposals. Applicants are asked to submit a detailed project proposal and a cooperative agreement application that requires Developer/EPA cost sharing. EPA co-funds selected Developers for one to two years. Second-year funding requires documentation of significant progress during the first year. Facilities, equipment, data collection, performance and development are monitored throughout the project. The US Department of Energy (DOE) and the US Air Force (USAF) are participants in the ETP. DOE has co-funded ETP projects since 1990 and the USAF since 1991. A goal of the ETP is to move developed technologies to the field-demonstration stage. A developer may be considered for participation in the SITE Demonstration Program if performance in the ETP indicates the technology is field-ready for evaluation. Six technology categories: biological, chemical, materials handling, physical, solidification/stabilization and thermal, are presently in the ETP. Technologies of primary interest to EPA are those that can treat complex mixtures of hazardous organic and inorganic contaminants and provide improved solids handling and/or pretreatment. An account of the background and progress of the ETP's first five years is presented in this paper. Technologies currently in the ETP are noted, and developers and EPA Project Managers, are listed. 4 refs., 11 figs., 6 tabs

  19. Toward identifying the next generation of superfund and hazardous waste site contaminants.

    Science.gov (United States)

    Ela, Wendell P; Sedlak, David L; Barlaz, Morton A; Henry, Heather F; Muir, Derek C G; Swackhamer, Deborah L; Weber, Eric J; Arnold, Robert G; Ferguson, P Lee; Field, Jennifer A; Furlong, Edward T; Giesy, John P; Halden, Rolf U; Henry, Tala; Hites, Ronald A; Hornbuckle, Keri C; Howard, Philip H; Luthy, Richard G; Meyer, Anita K; Sáez, A Eduardo; Vom Saal, Frederick S; Vulpe, Chris D; Wiesner, Mark R

    2011-01-01

    This commentary evolved from a workshop sponsored by the National Institute of Environmental Health Sciences titled "Superfund Contaminants: The Next Generation" held in Tucson, Arizona, in August 2009. All the authors were workshop participants. Our aim was to initiate a dynamic, adaptable process for identifying contaminants of emerging concern (CECs) that are likely to be found in future hazardous waste sites, and to identify the gaps in primary research that cause uncertainty in determining future hazardous waste site contaminants. Superfund-relevant CECs can be characterized by specific attributes: They are persistent, bioaccumulative, toxic, occur in large quantities, and have localized accumulation with a likelihood of exposure. Although still under development and incompletely applied, methods to quantify these attributes can assist in winnowing down the list of candidates from the universe of potential CECs. Unfortunately, significant research gaps exist in detection and quantification, environmental fate and transport, health and risk assessment, and site exploration and remediation for CECs. Addressing these gaps is prerequisite to a preventive approach to generating and managing hazardous waste sites. A need exists for a carefully considered and orchestrated expansion of programmatic and research efforts to identify, evaluate, and manage CECs of hazardous waste site relevance, including developing an evolving list of priority CECs, intensifying the identification and monitoring of likely sites of present or future accumulation of CECs, and implementing efforts that focus on a holistic approach to prevention.

  20. Challenge of superfund community relations

    International Nuclear Information System (INIS)

    Goldman, N.J.

    1991-01-01

    Conducting a community relations effort in a community which is home to a Superfund site is a formidable challenge. Any education press, however appropriate, quickly falls victim to doubt, mistrust of fears of the very public intended to be served by the effort. While each site is uniquely different, the issues raised by affected communities in one part of the country are strikingly similar to those raised in other parts. Those most involved must join those most affected in seeking meaningful solutions and in building the trust that is so vital in moving forward with Superfund

  1. Land use and demography survey for a large superfund site

    International Nuclear Information System (INIS)

    Hattemer-Frey, H.A.; Quinlan, R.E.; Krieger, G.R.; Lau, V.

    1994-01-01

    Inconsistencies in the exposure assessment process often arise when risk assessors are forced to make assumptions about the frequency and duration of exposures in the absence of site-specific data. EPA encourages the collection of site-specific data so that risks can be more accurately assessed on a case-by-case basis. Typically, estimates of exposure frequency and duration represent the largest source of uncertainty for non-food related exposure pathways, while the largest source of uncertainty for foodchain pathways stems primarily from estimating the fraction ingested that originated from the affected area. A Land Use and Demography Survey was conducted to obtain site-specific information on: (1) the amount of time individuals spend indoors, outdoors, and on or near affected areas; (2) recreational use of surface water bodies on-site; (3) the percentage of food items consumed that were raised or produced locally; and (4) other behavioral patterns and activities that could influence their exposure to site-related chemicals. More than 300 households were randomly selected and the residents personally interviewed. A wide variety of individuals ranging from children to elderly residents with vastly different recreational, behavioral, and consumption patterns were interviewed. This paper discusses the survey results in relation to EPA standard default exposure assumptions

  2. Assessment of international remedial technologies for application to Superfund sites

    International Nuclear Information System (INIS)

    Sanning, D.E.

    1990-01-01

    This paper presents some of the logical arguments for conducting research on remedial technologies for contaminated land and groundwater at an international level. It gives information on many of the international organizations that are involved in environmental programs, but it especially gives emphasis to the NATO-CCMS pilot study on Demonstration of Remedial Action Technologies for Contaminated Land and Groundwater. The purpose of the study is to field demonstrate and evaluate new/innovative technologies for remedial action at uncontrolled hazardous waste sites. This study is a logical international extension of the US EPA SITE program. It offers the opportunity to obtain a multiple data base on various remedial action unit processes without any single country having to commit a disproportionate amount of its internal resources to any specific activity. Each participating country provides the necessary resources for those demonstrations which they are contributing to the study. Sites are selected by a majority vote of all participating countries (no country is permitted to vote for its own sites). The study is a 5 year program with participants from Canada, Denmark, Federal Republic of Germany, France, Greece, Italy, Japan, the Netherlands, Norway, Spain, and the US. The need for cost-effective remedial action technologies for hazardous waste sites is a problem of all industrialized countries. The need to build a knowledge base of emerging remedial technologies was the impetus behind the USEPA's lead role and commitment to this pilot study

  3. EXPERIENCE IN INCINERATION APPLICABLE TO SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This document can be used as a reference tool for hazardous waste site remediation where incineration is used as a treatment alternative. It provides the user with information garnered from the experiences of others who use incineration. The document presents useful lessons in ev...

  4. Remediation of acid tar sludge at a Superfund site

    International Nuclear Information System (INIS)

    Grajczak, P.; McManus, R.W.

    1995-01-01

    An old refinery site in Texas was safely remediated a year before schedule and for 25% less than original engineering estimates through aggressive project management and the application of an innovative design. The authors planned to solidify the petroleum acid sludge and place it in an on-site, constructed landfill. Careful evaluation of available solidification technologies lead to selection of the DCR process, a patented stabilization process far waste treatment. The technology offered low expansion factor, low reagent to waste ratio, and low cost. The process also proved to be efficient and safe, implemented using a custom-designed, transportable treatment unit. High treatment rates and continuous uninterrupted operation resulted in early completion of the waste treatment task

  5. Bedrock neutralization study for the Bruin Lagoon Superfund Site

    International Nuclear Information System (INIS)

    Patelunas, G.M.; Lenhardt, D.R.; Niece, J.E.

    1989-01-01

    The Bruin Lagoon site is located in Bruin Butler County, Pennsylvania, and is listed as No. 3 on the U.S. Environmental Protection Agencies' National Priority List. The Lagoon contains waste petroleum tars, sulfuric acid, coal combustion ash, spent bauxite and other waste materials. This paper reports on the bedrock neutralization study, conducted to assess the feasibility of injecting caustic solutions into acid-contaminated bedrock beneath the lagoon. The site is underlain by a fine to medium grain quartz sandstone which is contaminated with acid to depths in excess of 30 feet. For this investigation, Nx-cores were obtained and pressure tests conducted to a depth of 30 feet below the top of rock. Leach tests were conducted on contaminated core sections using sodium hydroxide and sodium carbonate solutions. A total of 12 core sections were exposed in 3-inch diameter test cylinders and permeated under a positive pressure of 25 to 50 psi. Measurements of leachate volume, temperature, pH, and hydraulic conductivity were recorded

  6. 76 FR 24479 - In the Matter of the Taylor Lumber and Treating Superfund Site, Sheridan, Oregon, Amendment to...

    Science.gov (United States)

    2011-05-02

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9300-9] In the Matter of the Taylor Lumber and Treating... Taylor Lumber and Treating Site, which PWPO was acquiring, in exchange for several obligations related to...-553- 0705. Comments should reference the Taylor Lumber and Treating Superfund Site in Sheridan, Oregon...

  7. Regional economic impact assessment: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Harrison, David; Coughlin, Conor; Hogan, Dylan; Edwards, Deborah A; Smith, Benjamin C

    2018-01-01

    The present paper describes a methodology for evaluating impacts of Superfund remedial alternatives on the regional economy in the context of a broader sustainability evaluation. Although economic impact methodology is well established, some applications to Superfund remedial evaluation have created confusion because of seemingly contradictory results. This confusion arises from failure to be explicit about 2 opposing impacts of remediation expenditures: 1) positive regional impacts of spending additional money in the region and 2) negative regional impacts of the need to pay for the expenditures (and thus forgo other expenditures in the region). The present paper provides a template for economic impact assessment that takes both positive and negative impacts into account, thus providing comprehensive estimates of net impacts. The paper also provides a strategy for identifying and estimating major uncertainties in the net impacts. The recommended methodology was applied at the Portland Harbor Superfund Site, located along the Lower Willamette River in Portland, Oregon, USA. The US Environmental Protection Agency (USEPA) developed remedial alternatives that it estimated would cost up to several billion dollars, with construction durations possibly lasting decades. The economic study estimated regional economic impacts-measured in terms of gross regional product (GRP), personal income, population, and employment-for 5 of the USEPA alternatives relative to the "no further action" alternative. Integr Environ Assess Manag 2018;14:32-42. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  8. Diffusive flux of PAHs across sediment-water and water-air interfaces at urban superfund sites.

    Science.gov (United States)

    Minick, D James; Anderson, Kim A

    2017-09-01

    Superfund sites may be a source of polycyclic aromatic hydrocarbons (PAHs) to the surrounding environment. These sites can also act as PAH sinks from present-day anthropogenic activities, especially in urban locations. Understanding PAH transport across environmental compartments helps to define the relative contributions of these sources and is therefore important for informing remedial and management decisions. In the present study, paired passive samplers were co-deployed at sediment-water and water-air interfaces within the Portland Harbor Superfund Site and the McCormick and Baxter Superfund Site. These sites, located along the Willamette River (Portland, OR, USA), have PAH contamination from both legacy and modern sources. Diffusive flux calculations indicate that the Willamette River acts predominantly as a sink for low molecular weight PAHs from both the sediment and the air. The sediment was also predominantly a source of 4- and 5-ring PAHs to the river, and the river was a source of these same PAHs to the air, indicating that legacy pollution may be contributing to PAH exposure for residents of the Portland urban center. At the remediated McCormick and Baxter Superfund Site, flux measurements highlight locations within the sand and rock sediment cap where contaminant breakthrough is occurring. Environ Toxicol Chem 2017;36:2281-2289. © 2017 SETAC. © 2017 SETAC.

  9. Arsenic Fate, Transport And Stability Study: Groundwater, Surface Water, Soil And Sediment Investigation At Fort Devens Superfund Site

    Science.gov (United States)

    A field investigation was conducted to examine the distribution of arsenic in groundwater, surface water, and sediments at the Fort Devens Superfund Site. The study area encompassed a portion of plow Shop Pond (Red Cove), which receives groundwater discharge from the aquifer und...

  10. 77 FR 58989 - Proposed CERCLA Administrative Cost Recovery Settlement for the Buckbee-Mears Co. Superfund Site...

    Science.gov (United States)

    2012-09-25

    ... paid $150,000 attributable to the costs of marketing and selling the Properties; (b) The Bank will pay... ENVIRONMENTAL PROTECTION AGENCY [FRL-9720-7] Proposed CERCLA Administrative Cost Recovery... costs concerning the Buckbee-Mears Co. Superfund Site located in Cortland, Cortland County, New York...

  11. Optimization Review: Bunker Hill Mining and Metallurgical Complex Superfund Site, Central Treatment Plant (CTP), Kellogg, Shoshone County, Idaho

    Science.gov (United States)

    The Bunker Hill Mining and Metallurgical Complex Superfund Site includes all areas of the Coeur d’Alene Basin where mining-related contamination occurred and encompasses a 21-square mile “Box” along Interstate 90 surrounding the former smelter complex.

  12. 76 FR 20287 - Superfund Site, New Bedford Harbor, New Bedford, MA: Anchorage Ground and Regulated Navigation Area

    Science.gov (United States)

    2011-04-12

    ... may lead to the discovery of a significant environmental impact from this proposed rule. List of... engaged in activities associated with remediation efforts in the New Bedford Harbor Superfund Site... activity can be performed without undue risk to environmental remediation efforts. Requests for waivers...

  13. Mining-related sediment and soil contamination in a large Superfund site: Characterization, habitat implications, and remediation

    Science.gov (United States)

    Juracek, Kyle E.; Drake, K. D.

    2016-01-01

    Historical mining activity (1850–1970) in the now inactive Tri-State Mining District provided an ongoing source of lead and zinc to the environment including the US Environmental Protection Agency Superfund site located in Cherokee County, southeast Kansas, USA. The resultant contamination adversely affected biota and caused human health problems and risks. Remediation in the Superfund site requires an understanding of the magnitude and extent of contamination. To provide some of the required information, a series of sediment and soil investigations were conducted in and near the Superfund site to characterize lead and zinc contamination in the aquatic and floodplain environments along the main-stem Spring River and its major tributaries. In the Superfund site, the most pronounced lead and zinc contamination, with concentrations that far exceed sediment quality guidelines associated with potential adverse biological effects, was measured for streambed sediments and floodplain soils located within or downstream from the most intensive mining-affected areas. Tributary streambeds and floodplains in affected areas are heavily contaminated with some sites having lead and zinc concentrations that are an order of magnitude (or more) greater than the sediment quality guidelines. For the main-stem Spring River, the streambed is contaminated but the floodplain is mostly uncontaminated. Measured lead and zinc concentrations in streambed sediments, lakebed sediments, and floodplain soils documented a persistence of the post-mining contamination on a decadal timescale. These results provide a basis for the prioritization, development, and implementation of plans to remediate contamination in the affected aquatic and floodplain environments within the Superfund site.

  14. Mining-Related Sediment and Soil Contamination in a Large Superfund Site: Characterization, Habitat Implications, and Remediation.

    Science.gov (United States)

    Juracek, K E; Drake, K D

    2016-10-01

    Historical mining activity (1850-1970) in the now inactive Tri-State Mining District provided an ongoing source of lead and zinc to the environment including the US Environmental Protection Agency Superfund site located in Cherokee County, southeast Kansas, USA. The resultant contamination adversely affected biota and caused human health problems and risks. Remediation in the Superfund site requires an understanding of the magnitude and extent of contamination. To provide some of the required information, a series of sediment and soil investigations were conducted in and near the Superfund site to characterize lead and zinc contamination in the aquatic and floodplain environments along the main-stem Spring River and its major tributaries. In the Superfund site, the most pronounced lead and zinc contamination, with concentrations that far exceed sediment quality guidelines associated with potential adverse biological effects, was measured for streambed sediments and floodplain soils located within or downstream from the most intensive mining-affected areas. Tributary streambeds and floodplains in affected areas are heavily contaminated with some sites having lead and zinc concentrations that are an order of magnitude (or more) greater than the sediment quality guidelines. For the main-stem Spring River, the streambed is contaminated but the floodplain is mostly uncontaminated. Measured lead and zinc concentrations in streambed sediments, lakebed sediments, and floodplain soils documented a persistence of the post-mining contamination on a decadal timescale. These results provide a basis for the prioritization, development, and implementation of plans to remediate contamination in the affected aquatic and floodplain environments within the Superfund site.

  15. Contingency analysis modeling for superfund sites and other sources. Final report

    International Nuclear Information System (INIS)

    Christensen, D.; Kaiser, G.D.

    1993-01-01

    The report provides information on contingency modeling for a wide range of different accidental release scenarios of hazardous air pollutants that might take place at Superfund and other sites. The scenarios are used to illustrate how atmospheric dispersion models, including dense gas models, should be applied. Particular emphasis is made on the input data that is needed for proper applications of models. Flow charts direct the user to specific sections where various scenarios are discussed. A check list of items that should be discussed before running the model is provided. Several examples are provided to specifically show how to apply the models so as to produce a credible analysis for a particular release scenario

  16. Raman spectroscopy of efflorescent sulfate salts from Iron Mountain Mine Superfund Site, California

    Science.gov (United States)

    Sobron, Pablo; Alpers, Charles N.

    2013-01-01

    The Iron Mountain Mine Superfund Site near Redding, California, is a massive sulfide ore deposit that was mined for iron, silver, gold, copper, zinc, and pyrite intermittently for nearly 100 years. As a result, both water and air reached the sulfide deposits deep within the mountain, producing acid mine drainage consisting of sulfuric acid and heavy metals from the ore. Particularly, the drainage water from the Richmond Mine at Iron Mountain is among the most acidic waters naturally found on Earth. The mineralogy at Iron Mountain can serve as a proxy for understanding sulfate formation on Mars. Selected sulfate efflorescent salts from Iron Mountain, formed from extremely acidic waters via drainage from sulfide mining, have been characterized by means of Raman spectroscopy. Gypsum, ferricopiapite, copiapite, melanterite, coquimbite, and voltaite are found within the samples. This work has implications for Mars mineralogical and geochemical investigations as well as for terrestrial environmental investigations related to acid mine drainage contamination.

  17. New photocatalytic process provides 99.9+% reduction of VOC at Superfund site

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-03-01

    A new photocatalytic process, dubbed the A-I-R-2000 Process, is described. The process is said to offer marked economic advantages, while providing consistent 99.9+% reduction of volatile organic compounds (VOCs) from soil vapours and groundwater at the Stamina Mills Superfund site in North Smithfield, Rhode Island. The A-I-R-2000 process has been developed by KSE Inc., of Amherst, Massachusetts, and has been licensed exclusively worldwide to Trojan Technologies, Inc., of London, Ontario. The process consists essentially of adsorption of VOCs onto a UV light-activated proprietary catalysts, for breakdown to carbon dioxide and water, and also to hydrochloric acid and a small amount of chlorine gas when the VOCs are chlorinated. With a maximum internal operating temperature of 125 degrees F, it is a low-energy system when compared to other catalytic technologies that feature thermal catalytic equipment. 1 photo.

  18. Raman spectroscopy of efflorescent sulfate salts from Iron Mountain Mine Superfund Site, California.

    Science.gov (United States)

    Sobron, Pablo; Alpers, Charles N

    2013-03-01

    The Iron Mountain Mine Superfund Site near Redding, California, is a massive sulfide ore deposit that was mined for iron, silver, gold, copper, zinc, and pyrite intermittently for nearly 100 years. As a result, both water and air reached the sulfide deposits deep within the mountain, producing acid mine drainage consisting of sulfuric acid and heavy metals from the ore. Particularly, the drainage water from the Richmond Mine at Iron Mountain is among the most acidic waters naturally found on Earth. The mineralogy at Iron Mountain can serve as a proxy for understanding sulfate formation on Mars. Selected sulfate efflorescent salts from Iron Mountain, formed from extremely acidic waters via drainage from sulfide mining, have been characterized by means of Raman spectroscopy. Gypsum, ferricopiapite, copiapite, melanterite, coquimbite, and voltaite are found within the samples. This work has implications for Mars mineralogical and geochemical investigations as well as for terrestrial environmental investigations related to acid mine drainage contamination.

  19. Case study: Montclair/West Orange and Glen Ridge Radium Superfund sites

    International Nuclear Information System (INIS)

    Pezzella, R.; Seppi, P.; Watson, D.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Radium Sites are located 12 miles west of New York City in three residential communities in Essex County, New Jersey. The sites are contaminated with waste materials from a local radium processing facility which ceased operations in 1926. Houses were subsequently constructed on or near the radium waste disposal areas. The waste material was also used as backfill, which caused contamination to be spread randomly over the communities. There are 769 properties between four townships that comprise the Superfund sites. The Environmental Protection Agency (EPA) conducted an aerial survey in 1981 which identified the boundaries of the sites. In 1985, the New Jersey Department of Environmental Protection (NJDEP) began a pilot study to examine the feasibility of excavation and off-site disposal of contaminated material as a permanent solution. The study was interrupted when the permit for the disposal site was revoked by the state of Nevada. Since 1990 field testing has been completed on over 725 properties and remediation and restoration has been completed on 75 properties

  20. TECHNOLOGY EVALUATION REPORT, SITE PROGRAM DEMONSTRATION TEST: SHIRCO PILOT-SCALE INFRARED INCINERATION SYSTEM ROSE TOWNSHIP DEMODE ROAD SUPERFUND SITE - VOLUME II

    Science.gov (United States)

    The performance of the Shirco pilot-scale infrared thermal destruction system has been evaluated at the Rose Township, Demode Road Superfund Site and is presented in the report. The waste tested consisted of solvents, organics and heavy metals in an illegal dump site. Volume I gi...

  1. On using residual risk to assess the cost effectiveness and health protectiveness of remedy selection at superfund sites

    International Nuclear Information System (INIS)

    Katsumata, Peter T.; Kastenberg, William E.

    1998-01-01

    This article examines the importance of determining residual risk and its impact on remedy selection at Superfund Sites. Within this examination, risks are assessed using probabilistic models that incorporate the uncertainty and variability of the input parameters, and utilize parameter distributions based on current and applicable site-specific data. Monte Carlo methods are used to propagate these uncertainties and variabilities through the risk calculations resulting in a distribution for the estimate of both risk and residual risk. Such an approach permits an informed decision based on a broad information base which involves considering the entire uncertainty distribution of risk rather than a point estimate for each exposure scenario. Using the probabilistic risk estimates, with current and applicable site-specific data, alternative decisions regarding cleanup are obtained for two Superfund Sites

  2. Pilot-scale incineration of comtaminated soils from the drake chemical superfund site. Final report

    International Nuclear Information System (INIS)

    King, C.; Lee, J.W.; Waterland, L.R.

    1993-03-01

    A series of pilot-scale incineration tests were performed at the U.S. Environmental Protection Agency's (EPA's) Incineration Research Facility to evaluate the potential of incineration as an option to treat contaminated soils from the Drake Chemical Superfund site in Lock Haven, Pennsylvania. The soils at the Drake site are reported to be contaminated to varying degrees with various organic constituents and several hazardous constituent trace metals. The purpose of the test program was to evaluate the incinerability of selected site soils in terms of the destruction of contaminant organic constituents and the fate of contaminant trace metals. All tests were conducted in the rotary kiln incineration system at the IRF. Test results show that greater than 99.995 percent principal organic hazardous constituent (POHC) destruction and removal efficiencies (DRE) can be achieved at kiln exit gas temperatures of nominally 816 C (1,500 F) and 538 C (1,000 F). Complete soil decontamination of semivolatile organics was achieved; however, kiln ash levels of three volatile organic constituents remained comparable to soil levels

  3. In-situ stabilization of the Geiger (C and M Oil) Superfund Site

    International Nuclear Information System (INIS)

    Andromalos, K.B.; Ameel, M.E.

    1994-01-01

    The Geiger (C and M Oil) Superfund Site is the first US Army Corps of Engineers managed soil remediation project which utilized the in-situ stabilization/solidification technique to remediate the soil. This project involved the remediation of approximately 23,000 cubic yards of contaminated soil. Contaminants of concern included chromium, lead, PCB'S, toluene, benzene, and other organic compounds. Clean-up criteria for the stabilized material was equal to the National Primary Drinking Water Regulations, when tested using the TCLP leachate extraction method. Chromium, lead, and toluene were the main contaminants of concern, with TCLP clean-up goals of 150, 15 and 1,000 parts per billion (ppb), respectively. This National Priorities List (NPL) site is located near Charleston, SC and was an abandoned old waste oil facility that utilized unlined shallow trenches for the storage of waste oil. This paper summarizes the initial testing programs and the final production work at the site. Extensive testing was performed throughout all phases of the project. This testing was performed for the purpose of mix optimization, quality assurance, and verification testing. Specific parameters tested included: TCLP testing of organics, metals and PCBs, permeability testing, and unconfirmed compression strength

  4. Chemical dechlorination of pesticides at a superfund site in Region II

    International Nuclear Information System (INIS)

    Pendergrass, S.; Prince, J.

    1991-01-01

    Selecting technologies for cleaning up hazardous waste sites is a complex task, due in part to the rapidly changing nature of the state-of-the-art in technology. There is strong support for use of innovative technologies as specified in Section 121(b) of CERCLA. However, use of an innovative technology requires overcoming a variety of challenges. These challenges include: Screening potentially appropriate technologies, including innovative technologies, and selecting one or more potential innovative technologies for which preliminary results are promising; however, site-specific data are needed prior to technology evaluation. Evaluating the effectiveness of the proposed technology for the site through the use of treatability studies. Gaining acceptance for the innovative technology, which may employ new or unfamiliar concepts. Determining optimal design and operating parameters for full-scale remediation. This paper discusses the technology evaluation process and how that process supported the selection of an innovative technology for the Myers Property site, a Superfund site in Region II. A case study is presented showing how technology screening and laboratory treatability studies were used to evaluate an innovative technology (chemical dechlorination), which was selected as the technology for remediation of soils and sediments contaminated with pesticides at this environmentally sensitive site in New Jersey. The remedy selected by the U.S. EPA for this site designates chemical dechlorination as the selected technology, but does not specify any particular vendor or process. Rather, the remedy sets forth technology performance standards and recommends certain design tasks which may be used to select a particular chemical process. This paper discusses he of these design tasks as they might apply to innovative technologies, using chemical dechlorination as a model

  5. Efficient analysis using custom interactive visualization tools at a Superfund site

    International Nuclear Information System (INIS)

    Williams, G.; Durham, L.

    1992-01-01

    Custom visualization analysis programs were developed and used to analyze contaminant transport calculations from a three-dimensional numerical groundwater flow model developed for a Department of Energy Superfund site. The site hydrogeology, which is highly heterogenous, includes both fractured limestone and dolomite and alluvium deposits. Three-dimensional interactive visualization techniques were used to understand and analyze the three-dimensional, double-porosity modeling results. A graphical object oriented programming environment was applied to efficiently develop custom visualization programs in a coarse-grained data structure language. Comparisons were made, using the results from the three-dimensional, finite-difference model, between traditional two-dimensional analyses (contour and vector plots) and interactive three-dimensional techniques. Subjective comparison areas include the accuracy of analysis, the ability to understand the results of three-dimensional contaminant transport simulation, and the capability to transmit the results of the analysis to the project management. In addition, a quantitative comparison was made on the time required to develop a thorough analysis of the modeling results. The conclusions from the comparative study showed that the visualization analysis provided an increased awareness of the contaminant transport mechanisms, provided new insights into contaminant migration, and resulted in a significant time savings

  6. Estimating risk at a Superfund site contaminated with radiological and chemical wastes

    International Nuclear Information System (INIS)

    Temeshy, A.; Liedle, J.M.; Sims, L.M.; Efird, C.R.

    1992-01-01

    This paper describes the method and results for estimating carcinogenic and noncarcinogenic effects at a Superfund site that is radiologically and chemically contaminated. Risk to receptors from disposal of waste in soil and resulting contamination of groundwater, air, surface water, and sediment is quantified. Specific risk assessment components which are addressed are the exposure assessment, toxicity assessment, and the resulting risk characterization. In the exposure assessment, potential exposure pathways are identified using waste disposal inventory information for soil and modeled information for other media. Models are used to calculate future radionuclide concentrations in groundwater, soil, surface water and air. Chemical exposure concentrations are quantified using site characterization data. Models are used to determine concentrations of chemicals in surface water and in air. Toxicity parameters used to quantify the dose-response relationship associated with the carcinogenic contaminants are slope factors and with noncarcinogenic contaminants are reference doses. In the risk characterization step, results from the exposure assessment and toxicity assessment are summarized and integrated into quantitative risk estimates for carcinogens and hazard induces for noncarcinogens. Calculated risks for carcinogenic contaminants are compared with EPA's target risk range. At WAG 6, the risk from radionuclides and chemicals for an on-WAG homesteader exceeds EPA's target risk range. Hazard indices are compared to unity for noncarcinogenic contaminants. At WAG 6, the total pathway hazard index for the on-WAG homesteader exceeds unity

  7. Efficient analysis using custom interactive visualization tools at a Superfund site

    Energy Technology Data Exchange (ETDEWEB)

    Williams, G. [Northwestern Univ., Evanston, IL (United States); Durham, L. [Argonne National Lab., IL (United States)

    1992-12-01

    Custom visualization analysis programs were developed and used to analyze contaminant transport calculations from a three-dimensional numerical groundwater flow model developed for a Department of Energy Superfund site. The site hydrogeology, which is highly heterogenous, includes both fractured limestone and dolomite and alluvium deposits. Three-dimensional interactive visualization techniques were used to understand and analyze the three-dimensional, double-porosity modeling results. A graphical object oriented programming environment was applied to efficiently develop custom visualization programs in a coarse-grained data structure language. Comparisons were made, using the results from the three-dimensional, finite-difference model, between traditional two-dimensional analyses (contour and vector plots) and interactive three-dimensional techniques. Subjective comparison areas include the accuracy of analysis, the ability to understand the results of three-dimensional contaminant transport simulation, and the capability to transmit the results of the analysis to the project management. In addition, a quantitative comparison was made on the time required to develop a thorough analysis of the modeling results. The conclusions from the comparative study showed that the visualization analysis provided an increased awareness of the contaminant transport mechanisms, provided new insights into contaminant migration, and resulted in a significant time savings.

  8. Can standard sequential extraction determinations effectively define heavy metal species in superfund site soils?

    Energy Technology Data Exchange (ETDEWEB)

    Dahlin, Cheryl L.; Williamson, Connie A.; Collins, Wesley K.; Dahlin, David C.

    2001-01-01

    Speciation and distribution of heavy metals in soils controls the degree to which metals and their compounds are mobile, extractable, and plant-available. Consequently, speciation impacts the success of remediation efforts both by defining the relationship of the contaminants with their environment and by guiding development and evaluation of workable remediation strategies. The U.S. Department of Energy, Albany Research Center (Albany, OR), under a two-year interagency project with the U.S. Environmental Protection Agency (EPA), examined the suitability of sequential extraction as a definitive means to determine species of heavy metals in soil samples. Representative soil samples, contaminated with lead, arsenic, and/or chromium, were collected by EPA personnel from two Superfund sites, the National Lead Company site in Pedricktown, NJ, and the Roebling Steel, Inc., site in Florence, NJ. Data derived from Tessier=s standard three-stage sequential-extraction procedure were compared to data from a comprehensive characterization study that combined optical- and scanning-electron microscopy (with energy-dispersive x-ray and wavelength-dispersive x-ray analyses), x-ray diffraction, and chemical analyses. The results show that standard sequential-extraction procedures that were developed for characterizing species of contaminants in river sediments may be unsuitable for sole evaluation of contaminant species in industrial-site materials (particularly those that contain larger particles of the contaminants, encapsulated contaminants, and/or man-made materials such as slags, metals, and plastics). However, each sequential extraction or comprehensive characterization procedure has it=s own strengths and weaknesses. Findings of this study indicate that the use of both approaches, during the early stages of site studies, would be a best practice. The investigation also highlights the fact that an effective speciation study does not simply identify metal contaminants as

  9. Guidance: Strategies to Achieve Timely Settlement and Implementation of RD/RA at Superfund Sites

    Science.gov (United States)

    Memorandum recommends strategies to encourage PRPs to enter into a settlement using the model RD/RA Consent Decree; discusses the current model UAO; and suggests practical alternatives to expedite Superfund settlements and the cleanup process.

  10. Towards identifying the next generation of superfund and hazardous waste site contaminants

    Science.gov (United States)

    Ela, Wendell P.; Sedlak, David L.; Barlaz, Morton A.; Henry, Heather F.; Muir, Derek C.G.; Swackhamer, Deborah L.; Weber, Eric J.; Arnold, Robert G.; Ferguson, P. Lee; Field, Jennifer A.; Furlong, Edward T.; Giesy, John P.; Halden, Rolf U.; Henry, Tala; Hites, Ronald A.; Hornbuckle, Keri C.; Howard, Philip H.; Luthy, Richard G.; Meyer, Anita K.; Saez, A. Eduardo; vom Saal, Frederick S.; Vulpe, Chris D.; Wiesner, Mark R.

    2011-01-01

    Background This commentary evolved from a workshop sponsored by the National Institute of Environmental Health Sciences titled "Superfund Contaminants: The Next Generation" held in Tucson, Arizona, in August 2009. All the authors were workshop participants.

  11. Key Principles of Superfund Remedy Selection

    Science.gov (United States)

    Guidance on the primary considerations of remedy selection which are universally applicable at Superfund sites. Key guidance here include: Rules of Thumb for Superfund Remedy Selection and Role of the Baseline Risk Assessment.

  12. Graphic products used in the evaluation of traditional and emerging remote sensing technologies for the detection of fugitive contamination at selected superfund hazardous waste sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2011-01-01

    This report presents the overhead imagery and field sampling results used to prepare U.S. Geological Survey Open-File Report 2011-1050, 'Evaluation of Traditional and Emerging Remote Sensing Technologies for the Detection of Fugitive Contamination at Selected Superfund Hazardous Waste Sites'. These graphic products were used in the evaluation of remote sensing technology in postclosure monitoring of hazardous waste sites and represent an ongoing research effort. Soil sampling results presented here were accomplished with field portable x-ray fluoresence (XRF) technology and are used as screening tools only representing the current conditions of metals and other contaminants at selected Superfund hazardous waste sites.

  13. An evaluation of remote sensing technologies for the detection of fugitive contamination at selected Superfund hazardous waste sites in Pennsylvania

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2014-01-01

    This evaluation was conducted to assess the potential for using both traditional remote sensing, such as aerial imagery, and emerging remote sensing technology, such as hyperspectral imaging, as tools for postclosure monitoring of selected hazardous waste sites. Sixteen deleted Superfund (SF) National Priorities List (NPL) sites in Pennsylvania were imaged with a Civil Air Patrol (CAP) Airborne Real-Time Cueing Hyperspectral Enhanced Reconnaissance (ARCHER) sensor between 2009 and 2012. Deleted sites are those sites that have been remediated and removed from the NPL. The imagery was processed to radiance and atmospherically corrected to relative reflectance with standard software routines using the Environment for Visualizing Imagery (ENVI, ITT–VIS, Boulder, Colorado) software. Standard routines for anomaly detection, endmember collection, vegetation stress, and spectral analysis were applied.

  14. Superfund Query

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Superfund Query allows users to retrieve data from the Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) database.

  15. The atmosphere as a source/sink of polychlorinated biphenyls to/from the Lower Duwamish Waterway Superfund site

    International Nuclear Information System (INIS)

    Apell, Jennifer N.; Gschwend, Philip M.

    2017-01-01

    Waterbodies polluted with polychlorinated biphenyls (PCBs) may cause the air in the surrounding area to become PCB-contaminated. Conversely, when a waterbody is located in or near an urban area, the deposition of atmospheric PCBs may act as a low-level, ongoing source of PCB contamination to that water. Distinguishing these situations is necessary to be protective of human populations and to guide efforts seeking to cleanup such aquatic ecosystems. To assess the situation at the Lower Duwamish Waterway (LDW) Superfund site, low-density polyethylene passive samplers were deployed in the summer of 2015 to quantify freely dissolved water and gaseous air concentrations of PCBs thereby enabling estimates of the direction and magnitude of air-water exchange of PCB congeners. For the sum of the 27 PCB congeners, average concentrations were 220 pg/m 3 (95% C.I.: 80–610) in the air and 320 pg/L (95% C.I.: 110–960) in the water. The sum of air-water exchange fluxes of these PCB congeners was estimated to be 68 ng/m 2 /day (95% C.I.: 30–148) into the lower atmosphere, contrasting with the reported wet and dry depositional flux of only 5.5 ng/m 2 /day (95% C.I.: 1–38) from the air into the water. Therefore, the atmosphere was ultimately a sink of PCBs from the LDW Superfund site, at least under 2015 summertime conditions. However, we conclude that air-water exchange of PCBs is likely only a minor sink of PCBs from the LDW and only a minor source of contamination to the region's local atmosphere. - Highlights: • Passive samplers were used to estimate air and water concentrations. • At this site, PCBs were being transported from the water into the local atmosphere. • Air-water exchange was likely only a minor sink of PCBs for the LDW site. • The LDW was likely only a minor source of PCBs to the local atmosphere. - Air-water exchange of PCBs from the LDW Superfund site, calculated using passive sampler data, was determined to be a minor sink of PCBs from

  16. Geophysical logging and thermal imaging near the Hemphill Road TCE National Priorities List Superfund site near Gastonia, North Carolina

    Science.gov (United States)

    Antolino, Dominick J.; Chapman, Melinda J.

    2017-03-27

    Borehole geophysical logs and thermal imaging data were collected by the U.S. Geological Survey near the Hemphill Road TCE (trichloroethylene) National Priorities List Superfund site near Gastonia, North Carolina, during August 2014 through February 2015. In an effort to assist the U.S. Environmental Protection Agency in the development of a conceptual groundwater model for the assessment of current contaminant distribution and future migration of contaminants, surface geological mapping and borehole geophysical log and thermal imaging data collection, which included the delineation of more than 600 subsurface features (primarily fracture orientations), was completed in five open borehole wells and two private supply bedrock wells. In addition, areas of possible groundwater discharge within a nearby creek downgradient of the study site were determined based on temperature differences between the stream and bank seepage using thermal imagery.

  17. Research Implementation and Quality Assurance Project Plan: An Evaluation of Hyperspectral Remote Sensing Technologies for the Detection of Fugitive Contamination at Selected Superfund Hazardous Waste Sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2009-01-01

    This project is a research collaboration between the U.S. Environmental Protection Agency (EPA) Office of Inspector General (OIG) and the U.S. Geological Survey (USGS) Eastern Geographic Science Center (EGSC), for the purpose of evaluating the utility of hyperspectral remote sensing technology for post-closure monitoring of residual contamination at delisted and closed hazardous waste sites as defined under the Comprehensive Environmental Response Compensation and Liability Act [CERCLA (also known as 'Superfund')] of 1980 and the Superfund Amendments and Reauthorization Act (SARA) of 1986.

  18. Final Report; Arsenic Fate, Transport and Stability Study; Groundwater, Surface Water, Soil And Sediment Investigation, Fort Devens Superfund Site, Devens, Massachusetts

    Science.gov (United States)

    This document presents results from the Fiscal Years 2006-2008 field investigation at the Fort Devens Superfund Site, Operable Unit 1 (Shepley's Hill Landfill) to fulfill the research objectives outlined in the proposal entitled, 'Fate and Transport of Arsenic in an Urban, Milita...

  19. Occurences and Fate of DDT Principal Isomers/Metabolites, DDA, and o,p'-DDD Enantiomers in Fish, Sediment and Water at a DDT-Impacted Superfund Site

    Science.gov (United States)

    In the 1950s and 60s, discharges from a DDT manufacturing plant contaminated a tributary system of the Tennessee River near Huntsville, Alabama, USA. Regulatory action resulted in declaring the area a Superfund site which required remediation and extensive monitoring. Monitoring ...

  20. DOJ News Release: New York Man Ordered to Pay Over $400,000 in Restitution and Fines for Role in Kickback Scheme at New Jersey Superfund Sites

    Science.gov (United States)

    WASHINGTON, D.C. – An Amherst, New York, man was ordered to pay over $400,000 in restitution and fines and placed on five years’ probation for his role in a kickback scheme at the Federal Creosote and Diamond Alkali Superfund sites in New Jersey.

  1. USA - Paper provided by the US delegation to the RWMC. Site Decontamination and Clean-up Under the U.S. EPA 'Superfund'

    International Nuclear Information System (INIS)

    2003-01-01

    capability, permanence, and cost may be considered to select between or modify alternatives. The ultimate disposal destination and disposal method for decontamination waste may be specified as part of the clean-up agreement. Release from Liability: Once clean-up goals have been met, a site may undergo 'close-out' and be removed from the National Priorities List. Due to the nature of liability under the Superfund law, however, a potentially responsible party remains potentially liable indefinitely. New information revealing additional hazards can provide grounds for re-opening a site. Current Issues: Some nuclear facilities have the potential to be regulated by both the Nuclear Regulatory Commission (NRC) and the EPA upon decommissioning. To avoid uncertainty and duplication of effort in these situations, EPA and NRC signed a Memorandum of Understanding in 2002. The agreement clarifies how EPA and NRC will cooperate regarding sites that operate and are decommissioned under an NRC license. In accordance with the Nuclear Waste Policy Act of 1982 (NWPA), the costs for disposal of commercial spent nuclear fuel (SNF) in a potential repository are to be funded by $0.001 per kWh fee levied on electricity generated and sold. For SNF generated prior to enactment of the NWPA, utilities were required to pay a one-time fee equivalent to an average charge of $0.001 per kWh. These fees are deposited in a Nuclear Waste Fund (NWF) held by the U.S treasury and managed by DOE The NWF is to be used for development and implementation of a radioactive waste management system in accordance with the NWPA, including a potential geologic repository. DOE is required to pay its fair share of cost for disposal of defence-related materials. DOE is currently in the process of developing a license application to be submitted to the NRC in December 2004 for the construction of a geologic repository at the Yucca Mountain site (Nevada). It is planned that, after waste emplacement and performance confirmation

  2. Hydrogeologic investigation of the Malvern TCE Superfund Site, Chester County, Pennsylvania

    Science.gov (United States)

    Sloto, Ronald A.

    1997-01-01

    The Malvern TCE Superfund Site, a former solvent recycling facility that now stores and sells solvents, consists of a plant and disposal area, which are approximately 1,900 ft (feet) apart. The site is underlain by an unconfined carbonate bedrock aquifer in which permeability has been enhanced in places by solution. Water levels respond quickly to precipitation and show a similar seasonal variation, response to precipitation, and range of fluctuation. The altitude of water levels in wells at the disposal area is nearly identical because of the small hydraulic gradient. A comparison of water-table maps for 1983, 1993, and 1994 shows that the general shape of the water table and hydraulic gradients in the area have remained the same through time and for different climatic conditions.The plant area is underlain by dolomite of the Elbrook Formation. The dolomite at the plant area does not yield as much water as the dolomite at the disposal area because it is less fractured, and wells penetrate few water-bearing fractures. Yields of nine wells at the plant area range from 1 to 200 gal/min (gallons per minute); the median yield is 6 gal/min. Specific capacities range from 0.08 to 2 (gal/min)/ft (gallons per minute per foot). Aquifer tests were conducted in two wells; median transmissivities estimated from the aquifer-test data ranged from 528 to 839 feet squared per day. Maximum concentrations of volatile organic compounds (VOC's) in ground water at the plant area in 1996 were 53,900 ug/L (micrograms per liter) for trichloroethylene (TCE), 7,110 ug/L for tetrachloroethylene (PCE), and 17,700 ug/L for 1,1,1-trichloroethane (TCA).A ground-water divide is located between the plant area and the disposal area. Ground-water withdrawal for dewatering the Catanach quarry has caused a cone of depression in the water-table surface that reaches to the plant area. From the plant area, ground water flows 1.2 miles to the northeast and discharges to the Catanach quarry. The regional

  3. Aquatic assessment of the Pike Hill Copper Mine Superfund site, Corinth, Vermont

    Science.gov (United States)

    Piatak, Nadine M.; Argue, Denise M.; Seal, Robert R.; Kiah, Richard G.; Besser, John M.; Coles, James F.; Hammarstrom, Jane M.; Levitan, Denise M.; Deacon, Jeffrey R.; Ingersoll, Christopher G.

    2013-01-01

    The Pike Hill Copper Mine Superfund site in Corinth, Orange County, Vermont, includes the Eureka, Union, and Smith mines along with areas of downstream aquatic ecosystem impairment. The site was placed on the U.S. Environmental Protection Agency (USEPA) National Priorities List in 2004. The mines, which operated from about 1847 to 1919, contain underground workings, foundations from historical structures, several waste-rock piles, and some flotation tailings. The mine site is drained to the northeast by Pike Hill Brook, which includes several wetland areas, and to the southeast by an unnamed tributary that flows to the south and enters Cookville Brook. Both brooks eventually drain into the Waits River, which flows into the Connecticut River. The aquatic ecosystem at the site was assessed using a variety of approaches that investigated surface-water quality, sediment quality, and various ecological indicators of stream-ecosystem health. The degradation of surface-water quality is caused by elevated concentrations of copper, and to a lesser extent cadmium, with localized effects caused by aluminum, iron, and zinc. Copper concentrations in surface waters reached or exceeded the USEPA national recommended chronic water-quality criteria for the protection of aquatic life in all of the Pike Hill Brook sampling locations except for the location farthest downstream, in half of the locations sampled in the tributary to Cookville Brook, and in about half of the locations in one wetland area located in Pike Hill Brook. Most of these same locations also contained concentrations of cadmium that exceeded the chronic water-quality criteria. In contrast, surface waters at background sampling locations were below these criteria for copper and cadmium. Comparison of hardness-based and Biotic Ligand Model (BLM)-based criteria for copper yields similar results with respect to the extent or number of stations impaired for surface waters in the affected area. However, the BLM

  4. CERCLA and RCRA requirements affecting cleanup of a hazardous waste management unit at a Superfund site: A case study

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1995-03-01

    The Fernald Environmental Management Project (FEMP) attempted to address both RCRA and CERCLA requirements at the fire training facility (FTF) by integrating a CERCLA removal action work plan with a RCRA closure plan. While the regulatory agencies involved with the FTF cleanup agreed the integrated document was a good idea, implementation proved complicated, owing to disposition of clean debris from a Superfund site, treatment of contaminated media, duration of cleanup activities, and cleanup certification. While all the complications have not been resolved, solutions to all have been proposed to Ohio EPA and U.S. EPA. Both agencies have worked closely with FEMP to find the most effective fulfillment of RCRA and CERCLA requirements

  5. An evaluation of traditional and emerging remote sensing technologies for the detection of fugitive contamination at selected Superfund hazardous waste sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2011-01-01

    This report represents a remote sensing research effort conducted by the U.S. Geological Survey in cooperation with the U.S. Environmental Protection Agency (EPA) for the EPA Office of Inspector General. The objective of this investigation was to explore the efficacy of remote sensing as a technology for postclosure monitoring of hazardous waste sites as defined under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (Public Law 96-510, 42 U.S.C. §9601 et seq.), also known as \\"Superfund.\\" Five delisted Superfund sites in Maryland and Virginia were imaged with a hyperspectral sensor and visited for collection of soil, water, and spectral samples and inspection of general site conditions. This report evaluates traditional and hyperspectral imagery and field spectroscopic measurement techniques in the characterization and analysis of fugitive (anthropogenic, uncontrolled) contamination at previously remediated hazardous waste disposal sites.

  6. Superfund: right-to-know and hazardous waste site cleanup. Hearing before the Subcommittee on Commerce, Transportation, and Tourism of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session, December 20, 1985

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    Representatives of local and state offices and the congressional representative of St. Paul, Minnesota testified at a field hearing on the Superfund program. The focus of the hearing was on community right-to-know aspects and the cleanup of hazardous materials that were abandoned on federal sites. At issue was environmental problems at the 38 priority sites listed for Minnesota and the lack of information on health effects after over 20 years of environmental study of toxic substances. The proposed legislation would subject federal facilities and sites to the same standards, cleanup schedules, and oversite as private sites. A new enforcement bill would encourage citizen suits to force cleanup. Military arsenals that contribute to water and soil pollution were of particular concern. Witnesses discussed the need for a national right-to-know law so that businesses would not be tempted to relocate to avoid Minnesota's environmental policy. The hearing record covers the testimony of seven witnesses.

  7. Influence of a chlor-alkali superfund site on mercury bioaccumulation in periphyton and low-trophic level fauna

    Science.gov (United States)

    Buckman, Kate L.; Marvin-DiPasquale, Mark C.; Taylor, Vivien F.; Chalmers, Ann T.; Broadley, Hannah J.; Agee, Jennifer L.; Jackson, Brian P.; Chen, Celia Y.

    2015-01-01

    In Berlin, New Hampshire, USA, the Androscoggin River flows adjacent to a former chlor-alkali facility that is a US Environmental Protection Agency Superfund site and source of mercury (Hg) to the river. The present study was conducted to determine the fate and bioaccumulation of methylmercury (MeHg) to lower trophic-level taxa in the river. Surface sediment directly adjacent to the source showed significantly elevated MeHg (10–40× increase, mean ± standard deviation [SD]: 20.1 ± 24.8 ng g–1 dry wt) and total mercury (THg; 10–30× increase, mean ± SD: 2045 ± 2669 ng g–1 dry wt) compared with all other reaches, with sediment THg and MeHg from downstream reaches elevated (3–7× on average) relative to the reference (THg mean ± SD: 33.5 ± 9.33 ng g–1 dry wt; MeHg mean ± SD: 0.52 ± 0.21 ng g–1 dry wt). Water column THg concentrations adjacent to the point source for both particulate (0.23 ng L–1) and dissolved (0.76 ng L–1) fractions were 5-fold higher than at the reference sites, and 2-fold to 5-fold higher than downstream. Methylmercury production potential of periphyton material was highest (2–9 ng g–1 d–1 dry wt) adjacent to the Superfund site; other reaches were close to or below reporting limits (0. 1 ng g–1 d–1 dry wt). Total Hg and MeHg bioaccumulation in fauna was variable across sites and taxa, with no clear spatial patterns downstream of the contamination source. Crayfish, mayflies, and shiners showed a weak positive relationship with porewater MeHg concentration.

  8. The design and construction of large diameter pre-filter packed recovery wells at the Ninth Avenue Superfund Site

    International Nuclear Information System (INIS)

    Lombardo, S.L.; Maley, T.J.; Bono, B.A.

    1992-01-01

    Large diameter groundwater/oil recovery wells were installed in an unconfined sand aquifer at the Ninth Avenue Superfund Site in Gary, Indiana. To assure adequate filter packs, prefilter packed groundwater/oil recovery wells were selected to minimize silting by using appropriate screen slot size and filter pack. A properly sized filter pack was necessary to prevent the formation material from entering the well. During field drilling operations, open-quotes having sandsclose quotes and silting of existing wells were encountered. By using sieve analyses of the native aquifer soil, described by Driscoll (1989), the filter pack and screen slot size were selected. Prefilter packed well screens were selected for this site to assure the presence of a uniform filter pack, thus minimizing siltation in the wells. A prefilter packed well screen consists of a double screen with the interstitial space filled with granular filter pack material designed specifically for site conditions. These wells provide the adequate filter pack without the need to add additional filter pack material outside the well screen. Wells were installed using 12 1/4 inch ID hollow stem augers. This methodology is EPA-approved, expeditious, and inexpensive. Level B personal protective equipment was required during installation. Therefore, the advantages of hollow stem drilling include short drilling time and no circulation fluids. The 14 recovery wells were successfully installed in 14 days using the hollow stem auger drilling technique. Observations during well development revealed little or no silt present in purged groundwater

  9. Stigma: The Psychology and Economics of Superfund (2004)

    Science.gov (United States)

    Study documents the long-term impacts of Superfund cleanup on property values in communities neighboring prominent Superfund sites, examining the sale prices of nearly 35,000 homes for up to a thirty-year period near six very large Superfund sites.

  10. New York's new Superfund regulations: Implications for federal and other state programs

    International Nuclear Information System (INIS)

    Pavetto, C.S.; Rubinton, D.S.

    1994-01-01

    The need for cleaning up hazardous waste disposal sites was identified early in New York. In fact, New York's ''Superfund'' statute preceded the federal Superfund law thereby providing a model for CERCLA. Moreover, there are currently almost as many sites on New York's Registry of Inactive Hazardous Waste Disposal sites as there are sites on the National Priorities List. While New York's law served as a model for the federal CERCLA, CERCLA, in turn, has served as a model for other states' statutes. Similarly, lessons learned from the implementation of state Superfund statutes such as New York's can be instructive for those whose work involves dealing with CERCLA-type issues. This is because the problems associated with site restoration and cleanup, such as exceedingly complex site review and evaluation processes, high transaction costs, and difficulties in prioritizing sites for clean-up based upon the threat or risk of environmental harm, are universal

  11. Relating Magnetic Parameters to Heavy Metal Concentrations and Environmental Factors at Formosa Mine Superfund Site, Douglas County, OR

    Science.gov (United States)

    Upton, T. L.

    2016-12-01

    Advances in the field of environmental magnetism have led to exciting new applications for this field. Magnetic minerals are ubiquitous in the environment and tend to have an affinity for heavy metals. Hence, it has been demonstrated that magnetic properties are often significantly related to concentrations of heavy metals and other pollutants. As a result, magnetic techniques have been used as proxy for determining hot spots of several types of pollution produced from a diversity of anthropogenic sources. Magnetic measurements are non-destructive and relatively inexpensive compared to geochemical analyses. The utility of environmental magnetic methods varies widely depending on biological, chemical and physical processes that create and transform soils and sediments. Applications in the direction of mapping heavy metals have been studied and shown to be quite useful in countries such as China and India but to date, little research has been done in the US. As such, there is need to expand the scope of research to a wider range of soil types and land uses, especially within the US. This study investigates the application of environmental magnetic techniques to mapping of heavy metal concentrations at the Formosa Mine Superfund Site, an abandoned mine about 25 miles southwest of Roseburg, OR. The soils and sediment at this site are derived from pyrite-rich bedrock which is weak in terms of magnetic susceptibility. Using hotspot analysis, correlation and cluster analyses, interactions between metals and magnetic parameters are investigated in relation to environmental factors such as proximity to seeps and adits. Preliminary results suggest significant correlation of magnetic susceptibility with certain heavy metals, signifying that magnetic methods may be useful in mapping heavy metal hotspots at this site. Further analysis examines the relation of various land use differences in magnetic signatures obtained throughout the Cow Creek watershed.

  12. Superfund fact sheet: The remedial program. Fact sheet

    International Nuclear Information System (INIS)

    1992-09-01

    The fact sheet describes what various actions the EPA can take to clean up hazardous wastes sites. Explanations of how the criteria for environmental and public health risk assessment are determined and the role of state and local governments in site remediation are given. The fact sheet is one in a series providing reference information about Superfund issues and is intended for readers with no formal scientific training

  13. Air cleaning issues with contaminated sites

    Energy Technology Data Exchange (ETDEWEB)

    Bellamy, R.R. [Nuclear Regulatory Commission, King of Prussia, PA (United States)

    1997-08-01

    The US Nuclear Regulatory Commission has developed a list of contaminated sites that warrant special USNRC attention because they pose unique or complex decommissioning issues. This list of radiologically contaminated sites is termed the Site Decommissioning Management Plan (SDMP), and was first issued in 1990. A site is placed on the SDMP list if it has; (1) Problems with the viability of the responsible organization (e.g., the licensee for the site is unable or unwilling to pay for the decommissioning); (2) Large amounts of soil contamination or unused settling ponds or burial grounds that may make the waste difficult to dispose of; (3) The long-term presence of contaminated, unused buildings; (4) A previously terminated license; or (5) Contaminated or potential contamination of the ground water from on-site wastes. In deciding whether to add a site to the SDMP list, the NRC also considers the projected length of time for decommissioning and the willingness of the responsible organization to complete the decommissioning in a timely manner. Since the list was established, 9 sites have been removed from the list, and the current SDMP list contains 47 sites in 11 states. The USNRC annually publishes NUREG-1444, {open_quotes}Site Decommissioning Management Plan{close_quotes}, which updates the status of each site. This paper will discuss the philosophical goals of the SDMP, then will concentrate on the regulatory requirements associated with air cleaning issues at the SDMP sites during characterization and remediation. Both effluent and worker protection issues will be discussed. For effluents, the source terms at sites will be characterized, and measurement techniques will be presented. Off-site dose impacts will be included. For worker protection issues, air sampling analyses will be presented in order to show how the workers are adequately protected and their doses measured to satisfy regulatory criteria during decontamination operations. 1 tab.

  14. Superfund Record of Decision (EPA region 2): Glen Ridge Radium site, Essex County, NJ. (Second remedial action), June 1990. Final report

    International Nuclear Information System (INIS)

    1990-01-01

    The 90-acre Glen Ridge Radium site is a residential community in the Borough of Glen Ridge, Essex County, New Jersey. The site is adjacent to another Superfund site, the Montclair/West Orange site. The Glen Ridge site includes a community of 274 properties serviced by surface reservoirs in northern New Jersey. In the early 1900s, a radium processing or utilization facility was located in the vicinity of the site. EPA investigations in 1981 and 1983 confirmed the presence of gamma radiation contamination in the Glen Ridge area and in several adjacent houses. The ROD complements the previous 1989 ROD for this site and provides a final remedy. The primary contaminant of concern affecting the soil is radium 226

  15. 78 FR 57852 - Warrior Rosin Spill Superfund Site, Holt, Tuscaloosa County, Alabama ; Notice of Settlement

    Science.gov (United States)

    2013-09-20

    ... Response, Compensation and Liability Act (CERCLA), the United States Environmental Protection Agency has... addresses costs from a fund- lead Removal Action taken by EPA at the Site. DATES: The Agency will consider...

  16. Funding a California Superfund site with minimal state or federal money

    International Nuclear Information System (INIS)

    Mullaney, M.; Lemcke, H.

    1996-01-01

    The remediation of abandoned waste sites is a difficult task with limited funding from local, state and federal governments. It has become necessary for site managers and property owners to locate novel sources of funding and services to remediate these sites. An example of such a site is Pacific States Steel Corporation (PSSC) in Union City, California. PSSC abruptly closed its doors in 1978. The former employees (pensioners) of PSSC, won a civil suit in Federal Court for reinstatement of their medical benefits. The Federal Court took control of PSSC's largest remaining asset: a 93 acre site which was covered with slag, dilapidated buildings, a petroleum contaminated cooling pond, asbestos, PCBs, 800 barrels containing unknown fluids, heavy metals, non hazardous solid waste, and other wastes. A court-appointed Special Master submitted to the Court a plan to clean up and develop the 93 acre site to its highest and best use in order to pay the pensioners and other creditors. Total cleanup costs were estimated at over $30 million. Currently, approximately 31 acres are ready for development and 62 acres have all but two structures removed. All above ground waste streams have been remediated or contained

  17. Stakeholder value-linked sustainability assessment: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Apitz, Sabine E; Fitzpatrick, Anne G; McNally, Amanda; Harrison, David; Coughlin, Conor; Edwards, Deborah A

    2018-01-01

    Regulatory decisions on remediation should consider affected communities' needs and values, and how these might be impacted by remedial options; this process requires that diverse stakeholders are able to engage in a transparent consideration of value trade-offs and of the distribution of risks and benefits associated with remedial actions and outcomes. The Stakeholder Values Assessment (SVA) tool was developed to evaluate remedial impacts on environmental quality, economic viability, and social equity in the context of stakeholder values and priorities. Stakeholder values were linked to the pillars of sustainability and also to a range of metrics to evaluate how sediment remediation affects these values. Sediment remedial alternatives proposed by the US Environmental Protection Agency (USEPA) for the Portland Harbor Superfund Site were scored for each metric, based upon data provided in published feasibility study (FS) documents. Metric scores were aggregated to generate scores for each value; these were then aggregated to generate scores for each pillar of sustainability. In parallel, the inferred priorities (in terms of regional remediation, restoration, planning, and development) of diverse stakeholder groups (SGs) were used to evaluate the sensitivity and robustness of the values-based sustainability assessment to diverse SG priorities. This approach, which addresses social indicators of impact and then integrates them with indicators of environmental and economic impacts, goes well beyond the Comprehensive Environmental Response, Compensation and Liability Act's (CERCLA) 9 criteria for evaluating remedial alternatives because it evaluates how remedial alternatives might be ranked in terms of the diverse values and priorities of stakeholders. This approach identified trade-offs and points of potential contention, providing a systematic, semiquantitative, transparent valuation tool that can be used in community engagement. Integr Environ Assess Manag 2018

  18. Application of probabilistic risk assessment: Evaluating remedial alternatives at the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Ruffle, Betsy; Henderson, James; Murphy-Hagan, Clare; Kirkwood, Gemma; Wolf, Frederick; Edwards, Deborah A

    2018-01-01

    A probabilistic risk assessment (PRA) was performed to evaluate the range of potential baseline and postremedy health risks to fish consumers at the Portland Harbor Superfund Site (the "Site"). The analysis focused on risks of consuming fish resident to the Site containing polychlorinated biphenyls (PCBs), given that this exposure scenario and contaminant are the primary basis for US Environmental Protection Agency's (USEPA's) selected remedy per the January 2017 Record of Decision (ROD). The PRA used probability distributions fit to the same data sets used in the deterministic baseline human health risk assessment (BHHRA) as well as recent sediment and fish tissue data to evaluate the range and likelihood of current baseline cancer risks and noncancer hazards for anglers. Areas of elevated PCBs in sediment were identified on the basis of a geospatial evaluation of the surface sediment data, and the ranges of risks and hazards associated with pre- and postremedy conditions were calculated. The analysis showed that less active remediation (targeted to areas with the highest concentrations) compared to the remedial alternative selected by USEPA in the ROD can achieve USEPA's interim risk management benchmarks (cancer risk of 10 -4 and noncancer hazard index [HI] of 10) immediately postremediation for the vast majority of subsistence anglers that consume smallmouth bass (SMB) fillet tissue. In addition, the same targeted remedy achieves USEPA's long-term benchmarks (10 -5 and HI of 1) for the majority of recreational anglers. Additional sediment remediation would result in negligible additional risk reduction due to the influence of background. The PRA approach applied here provides a simple but adaptive framework for analysis of risks and remedial options focused on variability in exposures. It can be updated and refined with new data to evaluate and reduce uncertainty, improve understanding of the Site and target populations, and foster informed remedial decision

  19. Superfund Record of Decision (EPA Region 8): Denver Radium Site Streets, Colorado, March 1986. Final report

    International Nuclear Information System (INIS)

    1986-01-01

    Denver Radium Site Streets is located in Denver, Colorado. The operable unit is comprised of eight street segments in the Cheesman Park area and one segment in the upper downtown area. The nine contaminated street segments are owned by the City and County of Denver and extend approximately 4.5 miles through largely residential areas. The Denver Radium Site Streets contain a 4- to 6-inch layer of radium-contaminated asphalt. The contaminated layer is underlain by compacted gravel road base and is usually overlain by 4 to 12 inches of uncontaminated asphalt pavement. There is an estimated 38,500 cubic yards of contaminated material covering approximately 832,000 square feet. The selected remedial action for the site includes: leaving the contaminated material in place; improving institutional controls; and removing any contaminated material excavated during routine maintenance, repair, or construction activities in the affected streets to a facility approved for storage or disposal of contaminated material

  20. Passive Treatment And Monitoring At The Standard Mine Superfund Site, Crested Butte, CO

    Science.gov (United States)

    At the 2008 ASMR conference, data from the initial two months of operation of a U.S. EPA pilot biochemical reactor (BCR) was reported. The BCR was designed and constructed in August, 2007 to treat mining influenced water (MIW) emanating from an adit at a remote site in southern ...

  1. Passive Treatment And Monitoring At The Standard Mine Superfund Site, Crested Butte, CO (Presentation)

    Science.gov (United States)

    At the 2008 ASMR conference, data from the initial two months of operation of a U.S. EPA pilot biochemical reactor (BCR) was reported. The BCR was designed and constructed in August, 2007 to treat mining influenced water (MIW) emanating from an adit at a remote site in southern ...

  2. RCRA and CERCLA requirements affecting cleanup activities at a federal facility superfund site

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1994-01-01

    The Fernald Environmental Management Project (FEMP) achieved success on an integrated groundwater monitoring program which addressed both RCRA and CERCLA requirements. The integrated plan resulted in a cost savings of approximately $2.6 million. At present, the FEMP is also working on an integrated closure process to address Hazardous Waste Management Units (HWMUs) at the site. To date, Ohio EPA seems willing to discuss an integrated program with some stipulations. If an integrated program is implemented, a cost savings of several million dollars will be realized since the CERCLA documents can be used in place of a RCRA closure plan. The success of an integrated program at the FEMP is impossible without the support of DOE and the regulators. Since DOE is an owner/operator of the facility and Ohio EPA regulates hazardous waste management activities at the FEMP, both parties must be satisfied with the proposed integration activities. Similarly, US EPA retains CERCLA authority over the site along with a signed consent agreement with DOE, which dictates the schedule of the CERCLA activities. Another federal facility used RCRA closure plans to satisfy CERCLA activities. This federal facility was in a different US EPA Region than the FEMP. While this approach was successful for this site, an integrated approach was required at the FEMP because of the signed Consent Agreement and Consent Decree. For federal facilities which have a large number of HWMUs along with OUs, an integrated approach may result in a timely and cost-effective cleanup

  3. Methods for evaluating potential impacts to aquatic receptors at a metal-contaminated superfund site

    International Nuclear Information System (INIS)

    Hattemer-Frey, H.A.; Quinlan, R.E.; Krieger, G.R.

    1994-01-01

    An ecological risk assessment (ERA) was conducted for a metals mining site in the midwestern United States. Chemicals of potential concern were shown to be heavy metals associated with mine wastes and with base metal ore deposits that are characteristic of this area. Environmental receptors were identified by considering the relevant exposure pathways and the potential or known occurrence of species exposed via those pathways. Selection of key receptor species was designed to minimize the possibility that other species would be more exposed than the key species themselves and to include representation of sensitive organisms present at the subsites. In addition, an EPA-approved method was use to developed site-specific ambient water quality criteria. Ecological impacts were assessed using two complimentary approaches. First, potential chronic impacts were assessed by applying the toxicity quotient approach (i.e., a comparison of the measured concentration of site-related metals in surface water with available health-based criteria). Secondly, semi-quantitative comparative ecology data were used to obtain to provide a direct measure of impacts to key species. Results from these two approaches were used to provide a direct measure of impacts to key species. Results from these two approaches were used to obtain a realistic picture of actual and potential risks associated with exposure by key species to mining-related metals. This paper discusses the uncertainties associated with both methods and presents a method for interpreting disparate and sometimes confusing ecological data using the results from a case study

  4. Vadose zone investigations at the Lawrence Livermore National Laboratory Superfund Site: An overview

    International Nuclear Information System (INIS)

    Iovenitti, J.L.; Nitao, J.J.; Bishop, D.J.

    1992-09-01

    Lawrence Livermore National Laboratory (LLNL)is investigating the fate and transport of vadose zone contaminants at their Livermore site in Livermore, California. The principal objectives of this work are to identify potential source areas at the Livermore site which require remediation, to prioritize those areas, and finally, to optimize the remediation process. Primary contaminants of interest for this investigation are volatile organic compounds (VOCs) and tritium. A fully integrated, three-part program, consisting of quantitative modeling, field studies, and laboratory measurements, is in progress. To evaluate and predict vadose zone contaminant migration, quantitative modeling is used. Our modeling capabilities are being enhanced through the development of a multicomponent,three-dimensional,nonaqueous phase liquid-liquid-vapor,nonisothermal flow and transport computer code. This code will be also used to evaluate vadose zone remediation requirements. Field studies to acquire LLNL site-specific soil (sediment) characteristics for computer code calibration and validation include subsurf ace lithologic and contaminant profiling, in situ soil moisture content, ground surface emission flux of VOCs and tritium, transpiration of tritium, and ground surface evapotranspiration of water. Multilevel vadose zone monitoring devices are used to monitor the gaseous and aqueous transport of contaminants

  5. Selected remedy at the Queen City Farms superfund site: A risk management approach

    International Nuclear Information System (INIS)

    Weber, E.F.; Wilson, J.; Kirk, M.; Tochko, S.

    1994-01-01

    A risk management approach at a former industrial waste disposal site in western Washington resulted in a selected remedy that is cost-effective and that meets the CERCLA threshold criterion of protecting human health and the environment. The proposed remedy, which addresses contamination in soil and groundwater, does not require an ARARs waiver and received state and community acceptance. By analyzing the current and potential risk at the site, a proposed remedy was chosen that would control the source and naturally attenuate the groundwater plume. Source control will include removal and treatment of some light nonaqueous phase liquid (LNAPL) and some soil, followed by isolation of the remaining soil and LNAPL within a slurry wall and beneath a multilayer cap. A contingent groundwater extraction and treatment system was included to address uncertainty in the risk characterization. Implementing source control is predicted to result in a steady decline in volatile organic compound levels in the drinking water aquifer through adsorption, degradation, and dispersion. Exposure to groundwater during the period of natural attenuation will be controlled by monitoring, institutional controls, and a thorough characterization of the plume and receptors. 7 figs., 1 tab

  6. Concentration and trend of 1,4-dioxane in wells sampled during 2002–2017 in the vicinity of the Tucson International Airport Area Superfund Site, Arizona

    Science.gov (United States)

    Tillman, Fred D.

    2017-09-25

    Industrial activities causing extensive groundwater contamination led to the listing of the Tucson International Airport Area (TIAA) as a Superfund Site in 1983. Early groundwater investigations identified volatile organic compounds (VOCs), including the chlorinated solvents trichloroethylene (TCE) and perchloroethylene (PCE), in wells in the area. Several responsible parties were identified and cleanup activities began in the late 1980s. In 2002, the compound 1,4-dioxane was discovered in wells in the area and has since been detected in measurable concentrations throughout the site. The U.S. Environmental Protection Agency (USEPA) classifies 1,4-dioxane as a likely human carcinogen.The purpose of this map is to present 1,4-dioxane concentrations in wells sampled from 2002 through mid-2017 in the TIAA Superfund Site area to indicate both the current status and trends in 1,4-dioxane groundwater contamination. This map includes data from wells in the commercial and residential community in the TIAA and does not include data from wells in suspected or confirmed source areas, such as Air Force Plant 44 and Tucson International Airport, or from wells within treatment facilities.

  7. Superfund record of decision (EPA Region 4): Marzone Inc. /Chevron Chemical Company Superfund Site, Operable Unit 1, Tifton, GA, September 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-30

    This decision document (Record of Decision) presents the selected remedial action for the Marzone, Inc./Chevron Chemical Company Site in Tift County, Georgia. EPA has organized the work at this Site into two phases or operable units (OUs). Operable Unit No. 1 involves contamination on the 1.68-acre former Marzone pesticide blending area, part of the Slack Property, and railroad drainage ditch past the southwest corner of the horse pasture, and contaminated groundwater related to the Site. This first operable unit is broken down into two separate remedies; one for groundwater and the other for soil.

  8. Unique issues concerning ''placement'' vs ''movement'' of contaminated soils at ORNL's CERCLA sites

    International Nuclear Information System (INIS)

    Greer, J.K. Jr.; Schrof, C.A.

    1992-01-01

    At Oak Ridge National Laboratory, which is owned and operated by the US Department of Energy (DOE), there are several areas where hazardous wastes and/or radioactive materials have been placed in shallow land burial trenches or ''auger'' holes for disposal. Since Oak Ridge Reservation (ORR) has been placed on the National Priority List (NPL) by the US Environmental Protection Agency (EPA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) applies to waste disposal sites at ORNL. Under CERCLA, the RCRA regulations, pertaining to the LDRs, apply to CERCLA activities if the regulations are deemed ''applicable or relevant and appropriate'' (ARARS) by the lead agency or by the EPA. This report discusses the following issue: Under what conditions will contaminated soil and debris generated at a Superfund site be subject to the Resource Conservation and Recovery Act (RCRA) land disposal restrictions (LDRs) treatment standards?

  9. Onondaga Lake: A Forsaken Superfund Site, or a Sampling Playground for Environmental Geochemistry Classes?

    Science.gov (United States)

    Karmosky, C. C.; Harpp, K. S.

    2004-05-01

    Onondaga Lake, in Syracuse, NY, is described by the EPA as one of the most polluted lakes in the US. High levels of heavy metal and semi-volatile organic contamination provide an excellent case study that serves as the cornerstone for an environmental geochemistry course at Colgate University. Our course is designed to teach students basic environmental analysis skills including experimental design, sample preparation, analytical instrumentation operation, data processing and statistical analysis, and preparation of a collaborative scientific paper. Participating students generally have some background in environmental geology, but rarely more than one semester of chemistry. The Onondaga Lake project is the focus of the course for approximately half the semester. At the outset of the project, students are presented with a driving question that is answered through a series of guided field and lab investigations, such as an assessment of the environmental consequences of a proposed marina along the lakefront. The students' first task is to delve into the lake's environmental history, including identification of contaminants, location of point and non-point pollution sources, and clean-up efforts. Students then participate in 2 field trips to the site. First, students learn the geography of the lake system, collect sediment and water samples, and observe mitigation efforts at the wastewater treatment plant. The second trip is 2-3 weeks later, after students have assessed further sampling needs. Identification and quantification of organic compounds are accomplished by GC-MS, and heavy metal contents are determined by ICP-MS. Students compile their results, perform statistical analyses, and collaboratively draw their conclusions regarding the impact of the proposed project. The final product is a single report written by the entire class, an exercise in organization, cooperation, and planning that is usually the most challenging, but ultimately the most rewarding

  10. SUPERFUND TREATABILITY CLEARINGHOUSE: BDAT FOR SOLIDIFICATION/STABILIZATION TECHNOLOGY FOR SUPERFUND SOILS (DRAFT FINAL REPORT)

    Science.gov (United States)

    This report evaluates the performance of solidification as a method for treating solids from Superfund sites. Tests were conducted on four different artificially contaminated soils which are representative of soils found at the sites. Contaminated soils were solidified us...

  11. Arsenic species in weathering mine tailings and biogenic solids at the Lava Cap Mine Superfund Site, Nevada City, CA

    Directory of Open Access Journals (Sweden)

    Ashley Roger P

    2011-01-01

    Full Text Available Abstract Background A realistic estimation of the health risk of human exposure to solid-phase arsenic (As derived from historic mining operations is a major challenge to redevelopment of California's famed "Mother Lode" region. Arsenic, a known carcinogen, occurs in multiple solid forms that vary in bioaccessibility. X-ray absorption fine-structure spectroscopy (XAFS was used to identify and quantify the forms of As in mine wastes and biogenic solids at the Lava Cap Mine Superfund (LCMS site, a historic "Mother Lode" gold mine. Principal component analysis (PCA was used to assess variance within water chemistry, solids chemistry, and XAFS spectral datasets. Linear combination, least-squares fits constrained in part by PCA results were then used to quantify arsenic speciation in XAFS spectra of tailings and biogenic solids. Results The highest dissolved arsenic concentrations were found in Lost Lake porewater and in a groundwater-fed pond in the tailings deposition area. Iron, dissolved oxygen, alkalinity, specific conductivity, and As were the major variables in the water chemistry PCA. Arsenic was, on average, 14 times more concentrated in biologically-produced iron (hydroxide than in mine tailings. Phosphorous, manganese, calcium, aluminum, and As were the major variables in the solids chemistry PCA. Linear combination fits to XAFS spectra indicate that arsenopyrite (FeAsS, the dominant form of As in ore material, remains abundant (average: 65% in minimally-weathered ore samples and water-saturated tailings at the bottom of Lost Lake. However, tailings that underwent drying and wetting cycles contain an average of only 30% arsenopyrite. The predominant products of arsenopyrite weathering were identified by XAFS to be As-bearing Fe (hydroxide and arseniosiderite (Ca2Fe(AsO43O3•3H2O. Existence of the former species is not in question, but the presence of the latter species was not confirmed by additional measurements, so its identification is

  12. Geophysical log analysis of selected test and residential wells at the Shenandoah Road National Superfund Site, East Fishkill, Dutchess County, New York

    Science.gov (United States)

    Reynolds, Richard J.; Anderson, J. Alton; Williams, John H.

    2015-01-01

    The U.S. Geological Survey collected and analyzed geophysical logs from 20 test wells and 23 residential wells at the Shenandoah Road National Superfund Site in East Fishkill, New York, from 2006 through 2010 as part of an Interagency Agreement to provide hydrogeologic technical support to the U.S. Environmental Protection Agency, Region 2. The geophysical logs collected include caliper, gamma, acoustic and optical televiewer, deviation, electromagnetic-induction, magnetic-susceptibility, fluid-property, and flow under ambient and pumped conditions. The geophysical logs were analyzed along with single-well aquifer test data and drilling logs to characterize the lithology, fabric, fractures, and flow zones penetrated by the wells. The results of the geophysical log analysis were used as part of the hydrogeologic characterization of the site and in the design of discrete-zone monitoring installations in the test wells and selected residential wells.

  13. TREATABILITY STUDY REPORT OF GREEN MOUNTAIN LABORATORIES, INC.'S BIOREMEDIATION PROCESS, TREATMENT OF PCB CONTAMINATED SOILS, AT BEEDE WASTE OIL/CASH ENERGY SUPERFUND SITE, PLAISTOW, NEW HAMPSHIRE

    Science.gov (United States)

    In 1998, Green Mountain Laboratories, Inc. (GML) and the USEPA agreed to carry out a Superfund Innovative Technology Evaluation (SITE) project to evaluate the effectiveness of GML's Bioremediation Process for the treatment of PCB contaminated soils at the Beede Waste Oil/Cash Ene...

  14. Mercury in tree swallow food, eggs, bodies, and feathers at Acadia National Park, Maine, and an EPA superfund site, Ayer, Massachusetts.

    Science.gov (United States)

    Longcore, Jerry R; Haines, Terry A; Halteman, William A

    2007-03-01

    We monitored nest boxes during 1997-1999 at Acadia National Park, Mt. Desert Island, ME and at an old-field site in Orono, ME to determine mercury (Hg) uptake in tree swallow (Tachycineta bicolor) eggs, tissues, and food boluses. Also, in 1998-1999 we monitored nest boxes at Grove Pond and Plow Shop Pond at a U.S. Environmental Protection Agency Superfund site in Ayer, MA. We recorded breeding success at all locations. On average among locations, total mercury (THg) biomagnified 2 to 4-fold from food to eggs and 9 to 18-fold from food to feathers. These are minimum values because the proportion of transferable methyl mercury (MeHg) of the THg in insects varies (i.e., 35%-95% of THg) in food boluses. THg was highest in food boluses at Aunt Betty Pond at Acadia, whereas THg in eggs was highest at the Superfund site. A few eggs from nests at each of these locations exceeded the threshold (i.e., 800-1,000 ng/g, wet wt.) of embryotoxicity established for Hg. Hatching success was 88.9% to 100% among locations, but five eggs failed to hatch from 4 of the 11 clutches in which an egg exceeded this threshold. MeHg in feathers was highest in tree swallows at Aunt Betty Pond and the concentration of THg in bodies was related to the concentration in feathers. Transfer of an average of 80%-92% of the Hg in bodies to feathers may have enhanced nestling survival. Residues of Hg in tissues of tree swallows in the Northeast seem higher than those of the Midwest.

  15. Issues at manufactured gas plant sites

    International Nuclear Information System (INIS)

    Menzie, C.A.; Unites, D.F.; Nakles, D.

    1991-01-01

    Gas, manufactured from coal or oil was used to light and heat homes, industries, and streets of this country from the mid-1800s to the late 1940s or early 1950s. The era, with its associated gas lights, faded with the development of natural gas supplies and direct use of other fossil fuels. Today, Manufactured Gas Plant (MGP) sites are part of our history. Most of the MGPs were operated at a time when the state of the environmental sciences was much less sophisticated and the environmental regulations were much less stringent or nonexistent. While there was an awareness of potential environmental problems then the concerns were more qualitative (e.g., odor, color) and resulted in minimal treatment of process residuals. Inasmuch as there may be over a thousand MGP sites in the United States, it also became clear that utility research institutes such as the Gas Research Institute (GRI) and the Electric Power Research Institute (EPRI) should address key research and management issues related to site investigation, risk assessment, and site remediation. Information gained from these research initiatives would serve the industry as a whole, as well as other groups involved in the assessment of MGP sites. This paper provides and overview of these programs and identifies how additional information can be obtained

  16. Investigations of groundwater system and simulation of regional groundwater flow for North Penn Area 7 Superfund site, Montgomery County, Pennsylvania

    Science.gov (United States)

    Senior, Lisa A.; Goode, Daniel J.

    2013-01-01

    Groundwater in the vicinity of several industrial facilities in Upper Gwynedd Township and vicinity, Montgomery County, in southeast Pennsylvania has been shown to be contaminated with volatile organic compounds (VOCs), the most common of which is the solvent trichloroethylene (TCE). The 2-square-mile area was placed on the National Priorities List as the North Penn Area 7 Superfund site by the U.S. Environmental Protection Agency (USEPA) in 1989. The U.S. Geological Survey (USGS) conducted geophysical logging, aquifer testing, and water-level monitoring, and measured streamflows in and near North Penn Area 7 from fall 2000 through fall 2006 in a technical assistance study for the USEPA to develop an understanding of the hydrogeologic framework in the area as part of the USEPA Remedial Investigation. In addition, the USGS developed a groundwater-flow computer model based on the hydrogeologic framework to simulate regional groundwater flow and to estimate directions of groundwater flow and pathways of groundwater contaminants. The study area is underlain by Triassic- and Jurassic-age sandstones and shales of the Lockatong Formation and Brunswick Group in the Mesozoic Newark Basin. Regionally, these rocks strike northeast and dip to the northwest. The sequence of rocks form a fractured-sedimentary-rock aquifer that acts as a set of confined to partially confined layers of differing permeabilities. Depth to competent bedrock typically is less than 20 ft below land surface. The aquifer layers are recharged locally by precipitation and discharge locally to streams. The general configuration of the potentiometric surface in the aquifer is similar to topography, except in areas affected by pumping. The headwaters of Wissahickon Creek are nearby, and the stream flows southwest, parallel to strike, to bisect North Penn Area 7. Groundwater is pumped in the vicinity of North Penn Area 7 for industrial use, public supply, and residential supply. Results of field investigations

  17. Measurement of volatile organic compounds during start-up of bioremediation of French limited superfund site in Crosby Texas using wind dependent whole-air sampling

    International Nuclear Information System (INIS)

    Pleil, J.D.; Fortune, C.R.; Yoong, M.; Oliver, K.D.

    1993-01-01

    Whole-air sampling was performed before and after the start-up of the bioremediation of an industrial (primarily petrochemical) waste lagoon in Crosby Texas, near Houston. Four 'Sector Samplers' were deployed at the four corners of the French Limited Superfund Site. These samplers collect air into one of two SUMMA polished canisters depending upon wind direction and speed. When the wind blows at the sampler from across the waste lagoon, air is routed to the 'IN' sector canister, otherwise sample is collected in the 'OUT' sector canister. As such, each sampler provides its own background sample, and, upon gas chromatographic analysis, individual compounds can be associated with the waste lagoon. Five sets of 24-hour sector samples were taken; the first set was collected prior to the start of the bioremediation effort and the remaining four sets were taken sequentially for four 24-hour periods after the start-up of the procedure

  18. Treatability Study of In Situ Technologies for Remediation of Hexavalent Chromium in Groundwater at the Puchack Well Field Superfund Site, New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    Vermeul, Vince R.; Szecsody, Jim E.; Truex, Michael J.; Burns, Carolyn A.; Girvin, Donald C.; Phillips, Jerry L.; Devary, Brooks J.; Fischer, Ashley E.; Li, Shu-Mei W.

    2006-11-13

    This treatability study was conducted by Pacific Northwest National Laboratory (PNNL), at the request of the U. S. Environmental Protection Agency (EPA) Region 2, to evaluate the feasibility of using in situ treatment technologies for chromate reduction and immobilization at the Puchack Well Field Superfund Site in Pennsauken Township, New Jersey. In addition to in situ reductive treatments, which included the evaluation of both abiotic and biotic reduction of Puchack aquifer sediments, natural attenuation mechanisms were evaluated (i.e., chromate adsorption and reduction). Chromate exhibited typical anionic adsorption behavior, with greater adsorption at lower pH, at lower chromate concentration, and at lower concentrations of other competing anions. In particular, sulfate (at 50 mg/L) suppressed chromate adsorption by up to 50%. Chromate adsorption was not influenced by inorganic colloids.

  19. PCBs and DDE in tree swallow (Tachycineta bicolor) eggs and nestlings from an estuarine PCB superfund site, New Bedford Harbor, MA, U.S.A.

    Science.gov (United States)

    Jayaraman, Saro; Nacci, Diane E.; Champlin, Denise M.; Pruell, Richard J.; Rocha, Kenneth J.; Custer, Christine M.; Custer, Thomas W.; Cantwell, Mark

    2009-01-01

    While breeding tree swallows (Tachycineta bicolor) have been used as biomonitors for freshwater sites, we report the first use of this species to assess contaminant bioaccumulation from estuarine breeding grounds into these aerial insectivores. Eggs and nestlings were collected from nest boxes in a polychlorinated biphenyl (PCB) contaminated estuary, the New Bedford Harbor Superfund site (NBH, Massachusetts, USA), and a reference salt marsh, Fox Hill (FH, Jamestown, Rhode Island, USA). Sediments, eggs, and nestlings were compared on a ng g−1 wet weight basis for total PCBs and DDE (1,1-bis-(4-chlorophenyl)-2,2-dichloroethene), metabolite of DDT (1,1,1-trichloro-2,2-bis-(p-chlorophenyl)ethane). NBH samples contained high concentrations of PCBs compared to FH for sediment (36,500 and 0.2), eggs (11,200 and 323), and nestlings (16,800 and 26). PCB homologue patterns linked tree swallow contamination to NBH sediment. NBH samples were also contaminated with DDE compared to FH for sediment (207 and 0.9) and nestlings (235 and 30) but not for eggs (526 and 488), suggesting both NBH and nonbreeding ground sources for DDE. The relationships between sediment and tree swallow egg and nestling PCBs were similar to those reported for freshwater sites. Like some highly contaminated freshwater sites, NBH PCB bioaccumulation had little apparent effect on reproductive success.

  20. Identification of potential water-bearing zones by the use of borehole geophysics in the vicinity of Keystone Sanitation Superfund Site, Adams County, Pennsylvania and Carroll County, Maryland

    Science.gov (United States)

    Conger, Randall W.

    1997-01-01

    Between April 23, 1996, and June 21, 1996, the U.S. Environmental Protection Agency contracted Haliburton-NUS, Inc., to drill four clusters of three monitoring wells near the Keystone Sanitation Superfund Site. The purpose of the wells is to allow monitoring and sampling of shallow, intermediate, and deep waterbearing zones for the purpose of determining the horizontal and vertical distribution of any contaminated ground water migrating from the Keystone Site. Twelve monitoring wells, ranging in depth from 50 to 397.9 feet below land surface, were drilled in the vicinity of the Keystone Site. The U.S. Geological Survey conducted borehole-geophysical logging and determined, with geophysical logs and other available data, the ideal intervals to be screened in each well. Geophysical logs were run on four intermediate and four deep wells, and a caliper log only was run on shallow well CL-AD-173 (HN-1S). Interpretation of geophysical logs and existing data determined the placement of screens within each borehole.

  1. Superfund Record of Decision (EPA Region 5): Ossineke Groundwater Contamination Site, Alpena County, Ossineke, MI. (First remedial action), June 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The Ossineke Ground Water Contamination site is an area overlying a contaminated aquifer in Ossineke, Alpena County, Michigan. The site hydrogeology is characterized by an upper aquifer and lower confined aquifer, both of which supply drinking water to local residents. Historically there have been two contaminant source areas of concern within Ossineke. Area 1 is in the center of the Town of Ossineke where two gas stations are located, consisting of underground storage tanks, and a former automobile rustproofing shop. Area 2 is a laundry and dry cleaning facility that has an associated wash water pond containing chlorinated hydrocarbons and VOCs. The State advised all users of the upper aquifer to stop using their wells. In 1982, the State discovered that a snow plow had hit a gasoline pump causing an unknown amount of gasoline to spill and, subsequently, contaminate the basements of several businesses. In 1986, the State replaced residential wells affected by ground water contamination. Because the contaminants of concern have been confirmed to be related to petroleum releases from underground storage tanks, the Superfund program does not have the authority to address cleanup under CERLCLA. The selected remedial action for the site is that no further action

  2. Radiochemical Analyses of the Filter Cake, Granular Activated Carbon, and Treated Ground Water from the DTSC Stringfellow Superfund Site Pretreatment Plant

    International Nuclear Information System (INIS)

    Esser, B K; McConachie, W; Fischer, R; Sutton, M; Szechenyi, S

    2005-01-01

    The Department of Toxic Substance Control (DTSC) requested that Lawrence Livermore National Laboratory (LLNL) evaluate the treatment process currently employed at the Department's Stringfellow Superfund Site Pretreatment Plant (PTP) site to determine if wastes originating from the site were properly managed with regards to their radioactivity. In order to evaluate the current management strategy, LLNL suggested that DTSC characterize the effluents from the waste treatment system for radionuclide content. A sampling plan was developed; samples were collected and analyzed for radioactive constituents. Following is brief summary of those results and what implications for waste characterization may be made. (1) The sampling and analysis provides strong evidence that the radionuclides present are Naturally Occurring Radioactive Material (NORM). (2) The greatest source of radioactivity in the samples was naturally occurring uranium. The sample results indicate that the uranium concentration in the filter cake is higher than the Granular Activated Carbon (GAC) samples. (11 -14 and 2-6 ppm respectively). (3) No radiologic background for geologic materials has been established for the Stringfellow site, and comprehensive testing of the process stream has not been conducted. Without site-specific testing of geologic materials and waste process streams, it is not possible to conclude if filter cake and spent GAC samples contain radioactivity concentrated above natural background levels, or if radionuclides are being concentrated by the waste treatment process. Recommendation: The regulation of Technologically Enhanced, Naturally Occurring Radioactive Materials (T-NORM) is complex. Since the results of this study do not conclusively demonstrate that natural radioactive materials have not been concentrated by the treatment process it is recommended that the DTSC consult with the Department of Health Services (DHS) Radiological Health Branch to determine if any further action is

  3. Quantitative analysis of the extent of heavy-metal contamination in soils near Picher, Oklahoma, within the Tar Creek Superfund Site.

    Science.gov (United States)

    Beattie, Rachelle E; Henke, Wyatt; Davis, Conor; Mottaleb, M Abdul; Campbell, James H; McAliley, L Rex

    2017-04-01

    The Tri-State Mining District of Missouri, Kansas and Oklahoma was the site of large-scale mining operations primarily for lead and zinc until the mid-1950s. Although mining across the area has ceased, high concentrations of heavy metals remain in the region's soil and water systems. The town of Picher, Ottawa County, OK, lies within this district and was included in the Tar Creek Superfund Site by the U.S. Environmental Protection Agency in 1980 due to extensive contamination. To elucidate the extent of heavy-metal contamination, a soil-chemistry survey of the town of Picher was conducted. Samples (n = 111) were collected from mine tailings, locally known as chat, in Picher and along cardinal-direction transects within an 8.05-km radius of the town in August 2015. Samples were analyzed for soil pH, moisture, and metal content. Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES) analyses of 20 metals showed high concentrations of lead (>1000 ppm), cadmium (>40 ppm) and zinc (>4000 ppm) throughout the sampled region. Soil moisture content ranged from 0.30 to 35.9%, and pH values ranged from 5.14 to 7.42. MANOVA of metal profiles determined that soils collected from the north transect and chat were significantly different (p zinc were correlated with one another. These data show an unequal distribution of contamination surrounding the Picher mining site. Mapping heavy-metal contamination in these soils represents the first step in understanding the distribution of these contaminants at the Picher mining site. Copyright © 2016 Elsevier Ltd. All rights reserved.

  4. Occurrences and fate of DDT principal isomers/metabolites, DDA, and o,p'-DDD enantiomers in fish, sediment and water at a DDT-impacted Superfund site.

    Science.gov (United States)

    Garrison, A W; Cyterski, M; Roberts, K D; Burdette, D; Williamson, J; Avants, J K

    2014-11-01

    In the 1950s and 60s, discharges from a DDT manufacturing plant contaminated a tributary system of the Tennessee River near Huntsville, Alabama, USA. Regulatory action resulted in declaring the area a Superfund site which required remediation and extensive monitoring. Monitoring data collected from 1988, after remediation, through 2011 showed annual decreases approximating first-order decay in concentrations of total DDT and its six principal congeners (p,p'-DDT, o,p'-DDT, p,p'-DDD, o,p'-DDD, p,p'-DDE and o,p'-DDE) in filets from three species of fish. As of 2013, these concentrations met the regulatory requirements of 5 mg/kg or less total DDT for each fish tested. The enantiomer fractions (EF) of chiral o,p'-DDD in smallmouth buffalo and channel catfish were always below 0.5, indicating preferential decay of the (+)-enantiomer of this congener; this EF did not change significantly over 15 years. The often-neglected DDT metabolite p,p'-DDA was found at a concentration of about 20 μg/l in the ecosystem water. Published by Elsevier Ltd.

  5. Time series geophysical monitoring of permanganate injections and in situ chemical oxidation of PCE, OU1 area, Savage Superfund Site, Milford, NH, USA

    Science.gov (United States)

    Harte, Philip T.; Smith, Thor E.; Williams, John H.; Degnan, James R.

    2012-01-01

    In situ chemical oxidation (ISCO) treatment with sodium permanganate, an electrically conductive oxidant, provides a strong electrical signal for tracking of injectate transport using time series geophysical surveys including direct current (DC) resistivity and electromagnetic (EM) methods. Effective remediation is dependent upon placing the oxidant in close contact with the contaminated aquifer. Therefore, monitoring tools that provide enhanced tracking capability of the injectate offer considerable benefit to guide subsequent ISCO injections. Time-series geophysical surveys were performed at a superfund site in New Hampshire, USA over a one-year period to identify temporal changes in the bulk electrical conductivity of a tetrachloroethylene (PCE; also called tetrachloroethene) contaminated, glacially deposited aquifer due to the injection of sodium permanganate. The ISCO treatment involved a series of pulse injections of sodium permanganate from multiple injection wells within a contained area of the aquifer. After the initial injection, the permanganate was allowed to disperse under ambient groundwater velocities. Time series geophysical surveys identified the downward sinking and pooling of the sodium permanganate atop of the underlying till or bedrock surface caused by density-driven flow, and the limited horizontal spread of the sodium permanganate in the shallow parts of the aquifer during this injection period. When coupled with conventional monitoring, the surveys allowed for an assessment of ISCO treatment effectiveness in targeting the PCE plume and helped target areas for subsequent treatment.

  6. Time series geophysical monitoring of permanganate injections and in situ chemical oxidation of PCE, OU1 area, Savage Superfund Site, Milford, NH, USA.

    Science.gov (United States)

    Harte, Philip T; Smith, Thor E; Williams, John H; Degnan, James R

    2012-05-01

    In situ chemical oxidation (ISCO) treatment with sodium permanganate, an electrically conductive oxidant, provides a strong electrical signal for tracking of injectate transport using time series geophysical surveys including direct current (DC) resistivity and electromagnetic (EM) methods. Effective remediation is dependent upon placing the oxidant in close contact with the contaminated aquifer. Therefore, monitoring tools that provide enhanced tracking capability of the injectate offer considerable benefit to guide subsequent ISCO injections. Time-series geophysical surveys were performed at a superfund site in New Hampshire, USA over a one-year period to identify temporal changes in the bulk electrical conductivity of a tetrachloroethylene (PCE; also called tetrachloroethene) contaminated, glacially deposited aquifer due to the injection of sodium permanganate. The ISCO treatment involved a series of pulse injections of sodium permanganate from multiple injection wells within a contained area of the aquifer. After the initial injection, the permanganate was allowed to disperse under ambient groundwater velocities. Time series geophysical surveys identified the downward sinking and pooling of the sodium permanganate atop of the underlying till or bedrock surface caused by density-driven flow, and the limited horizontal spread of the sodium permanganate in the shallow parts of the aquifer during this injection period. When coupled with conventional monitoring, the surveys allowed for an assessment of ISCO treatment effectiveness in targeting the PCE plume and helped target areas for subsequent treatment. Published by Elsevier B.V.

  7. Superfund record of decision (EPA Region 3): Southern Maryland Wood Treating Site, Hollywood, MD, September 8, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The decision document presents the selected remedial action for the Southern Maryland Wood Treating Site (`the Site`), in Hollywood, Maryland. This is the second and final phase of remedial action for the Site. This phase addresses soil and sediment contamination and non-aqueous phase liquids (`NAPLs`) which are the principal threats remaining at the Site and are a source of contamination to the ground water and surface water.

  8. Superfund Record of Decision (EPA Region 2): Ramapo Landfill Site, Rockland County, NY. (First remedial action), March 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 60-acre former landfill site is located on a 96-acre tract in the Town of Ramapo, Rockland County, New York, about 35 miles northwest of New York City. Utility corridors lie on three sides of the site, including high-voltage power transmission lines. The site is currently being used as a compaction and transfer facility by the Town of Ramapo. Trash and debris are weighed at a weigh station/guardhouse, compacted at a baler facility in the northeastern corner of the site, and transferred to the Al Turi Landfill in Goshen, New York. The ROD represents the entire remedial action for the site by controlling source of contamination and the generation of leachate, and treatment of contaminated ground water. The primary contaminants of concern affecting soil, ground water, and surface water are VOCs, including benzene; other organics; and metals, including arsenic, chromium, and lead. The selected remedial action for the site is included

  9. Transcriptomic assessment of resistance to effects of an aryl hydrocarbon receptor (AHR agonist in embryos of Atlantic killifish (Fundulus heteroclitus from a marine Superfund site

    Directory of Open Access Journals (Sweden)

    Franks Diana G

    2011-05-01

    Full Text Available Abstract Background Populations of Atlantic killifish (Fundulus heteroclitus have evolved resistance to the embryotoxic effects of polychlorinated biphenyls (PCBs and other halogenated and nonhalogenated aromatic hydrocarbons that act through an aryl hydrocarbon receptor (AHR-dependent signaling pathway. The resistance is accompanied by reduced sensitivity to induction of cytochrome P450 1A (CYP1A, a widely used biomarker of aromatic hydrocarbon exposure and effect, but whether the reduced sensitivity is specific to CYP1A or reflects a genome-wide reduction in responsiveness to all AHR-mediated changes in gene expression is unknown. We compared gene expression profiles and the response to 3,3',4,4',5-pentachlorobiphenyl (PCB-126 exposure in embryos (5 and 10 dpf and larvae (15 dpf from F. heteroclitus populations inhabiting the New Bedford Harbor, Massachusetts (NBH Superfund site (PCB-resistant and a reference site, Scorton Creek, Massachusetts (SC; PCB-sensitive. Results Analysis using a 7,000-gene cDNA array revealed striking differences in responsiveness to PCB-126 between the populations; the differences occur at all three stages examined. There was a sizeable set of PCB-responsive genes in the sensitive SC population, a much smaller set of PCB-responsive genes in NBH fish, and few similarities in PCB-responsive genes between the two populations. Most of the array results were confirmed, and additional PCB-regulated genes identified, by RNA-Seq (deep pyrosequencing. Conclusions The results suggest that NBH fish possess a gene regulatory defect that is not specific to one target gene such as CYP1A but rather lies in a regulatory pathway that controls the transcriptional response of multiple genes to PCB exposure. The results are consistent with genome-wide disruption of AHR-dependent signaling in NBH fish.

  10. Changes in Groundwater Flow and Volatile Organic Compound Concentrations at the Fischer and Porter Superfund Site, Warminster Township, Bucks County, Pennsylvania, 1993-2009

    Science.gov (United States)

    Sloto, Ronald A.

    2010-01-01

    The 38-acre Fischer and Porter Company Superfund Site is in Warminster Township, Bucks County, Pa. Historically, as part of the manufacturing process, trichloroethylene (TCE) degreasers were used for parts cleaning. In 1979, the Bucks County Health Department detected TCE and other volatile organic compounds (VOCs) in water from the Fischer and Porter on-site supply wells and nearby public-supply wells. The Fischer and Porter Site was designated as a Superfund Site and placed on the National Priorities List in September 1983. A 1984 Record of Decision for the site required the Fischer and Porter Company to pump and treat groundwater contaminated by VOCs from three on-site wells at a combined rate of 75 gallons per minute to contain groundwater contamination on the property. Additionally, the Record of Decision recognized the need for treatment of the water from two nearby privately owned supply wells operated by the Warminster Heights Home Ownership Association. In 2004, the Warminster Heights Home Ownership Association sold its water distribution system, and both wells were taken out of service. The report describes changes in groundwater levels and contaminant concentrations and migration caused by the shutdown of the Warminster Heights supply wells and presents a delineation of the off-site groundwater-contamination plume. The U.S. Geological Survey (USGS) conducted this study (2006-09) in cooperation with the U.S. Environmental Protection Agency (USEPA). The Fischer and Porter Site and surrounding area are underlain by sedimentary rocks of the Stockton Formation of Late Triassic age. The rocks are chiefly interbedded arkosic sandstone and siltstone. The Stockton aquifer system is comprised of a series of gently dipping lithologic units with different hydraulic properties. A three-dimensional lithostratigraphic model was developed for the site on the basis of rock cores and borehole geophysical logs. The model was simplified by combining individual lithologic

  11. Post-remediation biomonitoring of pesticides and other contaminants in marine waters and sediment near the United Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    LD Antrim; NP Kohn

    2000-05-26

    Marine sediment remediation at the United Heckathorn Superfund Site was completed in April 1997. Water and mussel tissues were sampled in February 1999 from four stations near Lauritzen Canal in Richmond, California, for Year 2 of post-remediation monitoring of marine areas near the United Heckathorn Site. Dieldrin and dichlorodiphenyl trichloroethane (DDT) were analyzed in water samples, tissue samples from resident mussels, and tissue samples from transplanted mussels deployed for 4 months. Concentrations of dieldrin and total DDT in water and total DDT in tissue were compared with Year 1 of post-remediation monitoring, and with preremediation data from the California State Mussel Watch program (tissues) and the Ecological Risk Assessment for the United Heckathorn Superfund Site (tissues and water). Mussel tissues were also analyzed for polychlorinated biphenyls (PCB), which were detected in sediment samples. Chlorinated pesticide concentrations in water samples were similar to preremediation levels and did not meet remediation goals. Mean dieidrin concentrations in water ranged from 0.62 rig/L to 12.5 ng/L and were higher than the remediation goal (0.14 ng/L) at all stations. Mean total DDT concentrations in water ranged from 14.4 ng/L to 62.3 ng/L and exceeded the remediation goal (0.59 ng/L) at all stations. The highest concentrations of both pesticides were found at the Lauritzen Canal/End station. Despite exceedence of the remediation goals, chlorinated pesticide concentrations in Lauritzen Canal water samples were notably lower in 1999 than in 1998. Tissue samples from biomonitoring organisms (mussels) provide an indication of the longer-term integrated exposure to contaminants in the water column, which overcomes the limitations of grab samples of water. Biomonitoring results indicated that the bioavailability of chlorinated pesticides has been reduced from preremediation levels both in the dredged area and throughout Richmond Harbor. Total DDT and

  12. NPL Site Locations

    Data.gov (United States)

    U.S. Environmental Protection Agency — The National Priorities List (NPL) is a list published by EPA of Superfund sites. A site must be added to this list before remediation can begin under Superfund. The...

  13. NPL Site Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — The National Priorities List (NPL) is a list published by EPA of Superfund sites. A site must be added to this list before remediation can begin under Superfund. The...

  14. Guidance for performing site inspections under CERCLA

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    This guidance presents EPA`s site inspection (SI) strategy. The strategy discusses procedural guidelines to investigate potential Superfund (CERCLA) sites for evaluation pursuant to the Hazard Ranking System (HRS), revised in accordance with the Superfund Amendments and Reauthorization Act of 1986. The HRS is the primary means by which EPA evaluates sites for superfund`s National Priorities List (NPL).

  15. Superfund Technical Assistance Grants

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes data related to the Superfund Technical Assistance Grant program, including grant number, award amounts, award dates, period of performance,...

  16. Superfund TIO videos. Set A. Identifying PRPS. Removal process: Removal site evaluation. Part 2. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into three sections. Section 1 details the liability of Potentially Responsible Parties (PRPs) and describes the four classes of PRPs: current owners and operators, former owners and operators, generators, and transporters (if they selected the site). Section 2 lists the goals of the Potentially Responsible Party (PRP) search and explains how to identify key players during the PRP search. How to plan and conduct the PRP search is also outlined. Section 3 outlines the steps involved in conducting a removal site evaluation. A discussion of when to conduct a removal preliminary assessment, a removal site inspection, and an Engineering Evaluation/Cost Analysis (EE/AC) also is covered

  17. Site enforcement tracking system (SETS): PRP listing by site for region 9

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  18. Site enforcement tracking system (SETS): PRP listing by site for region 8

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  19. Site enforcement tracking system (SETS): PRP listing by site for region 10

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  20. Site enforcement tracking system (SETS): PRP listing by site for region 3

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  1. Site enforcement tracking system (SETS): PRP listing by site for region 2

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  2. Site enforcement tracking system (SETS): PRP listing by site for region 5

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  3. Site enforcement tracking system (SETS): PRP listing by site for region 6

    International Nuclear Information System (INIS)

    1993-04-01

    When expending Superfund monies at a CERCLA (Comprehensive Environmental Response, Compensation and Liability Act) site, EPA must conduct a search to identify parties with potential financial responsibility for remediation of uncontrolled hazardous waste sites. EPA regional Superfund Waste Management Staff issue a notice letter to the potentially responsible party (PRP). Data from the notice letter is used to form the Site Enforcement Tracking System (SETS). The data includes PRP name and address, a company contact person, the date the notice was issued, and the related CERCLA site name and identification number

  4. Shocking Path of Least Resistance Shines Light on Subsurface by Revealing the Paths of Water and the Presence of Faults: Stacked EM Case Studies over Barite Hills Superfund Site in South Carolina

    Science.gov (United States)

    Haggar, K. S.; Nelson, H. R., Jr.; Berent, L. J.

    2017-12-01

    The Barite Hills/Nevada Gold Fields mines are in Late Proterozoic and early Paleozoic rocks of the gold and iron sulfides rich Carolina slate belt. The mines were active from 1989 to1995. EPA and USGS site investigations in 2003 resulted in the declaration of the waste pit areas as a superfund site. The USGS and private consulting firms have evaluated subsurface water flow paths, faults & other groundwater-related features at this superfund site utilizing 2-D conductivity & 3-D electromagnetic (EM) surveys. The USGS employed conductivity to generate instantaneous 2-D profiles to evaluate shallow groundwater patterns. Porous regolith sediments, contaminated water & mine debris have high conductivity whereas bedrock is identified by its characteristic low conductivity readings. Consulting contractors integrated EM technology, magnetic & shallow well data to generate 3-D images of groundwater flow paths at given depths across the superfund site. In so doing several previously undetected faults were identified. Lighting strike data was integrated with the previously evaluated electrical and EM data to determine whether this form of natural-sourced EM data could complement and supplement the more traditional geophysical data described above. Several lightning attributes derived from 3-D lightning volumes were found to correlate to various features identified in the previous geophysical studies. Specifically, the attributes Apparent Resistivity, Apparent Permittivity, Peak Current & Tidal Gravity provided the deepest structural geological framework & provided insights into rock properties & earth tides. Most significantly, Peak Current showed remarkable coincidence with the preferred groundwater flow map identified by one of the contractors utilizing EM technology. This study demonstrates the utility of robust integrated EM technology applications for projects focused on hydrology, geohazards to dams, levees, and structures, as well as mineral and hydrocarbon exploration.

  5. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  6. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO - (Presentation)

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  7. Reclamation of waste rock material at the Summitville Mine Superfund site using organic matter and topsoil treatments

    Energy Technology Data Exchange (ETDEWEB)

    Winter, M.E.; Redente, E.F.

    1999-07-01

    The Summitville Mine was a high elevation (3,500 m) open-pit gold mine located in southwestern Colorado. The mine was abandoned in 1992 leaving approximately 200 ha of disturbed area comprised partially of two large waste rock piles. Reclamation of waste rock material is challenging due to extreme climatic conditions in conjunction with a high acid-production potential and low organic matter concentration of the material. In addition, stockpiled topsoil at the site is acidic and may be biologically inactive due to long-term storage, and therefore sufficient plant growth medium may be limited. The purpose of this study was to determine the effect of organic amendments (mushroom compost vs. biosolids) and topsoil (stockpiled vs. nonstockpiled) on aboveground biomass, herbaceous cover, and trace element uptake. An on-site field study was established in 1995 to identify the most effective combination of treatments for successful reclamation of waste rock material. Incorporation of organic matter increased total aboveground production and cover, with mushroom compost being more effective than biosolids, but did not show significant trends relative to trace element uptake. The use of topsoil did not show a significant response relative to aboveground production, cover, and trace element uptake. This study shows that waste rock materials can be directly revegetated if properly neutralized, fertilized, and amended with organic matter. Additionally, stockpiled topsoil was equivalent in plant growth to non-stockpiled topsoil when neutralized with lime.

  8. Temporal Chemical Data for Sediment, Water, and Biological Samples from the Lava Cap Mine Superfund Site, Nevada County, California-2006-2008

    Science.gov (United States)

    Foster, Andrea L.; Ona-Nguema, Georges; Tufano, Kate; White, Richard III

    2010-01-01

    the possibility of future movement of tailings, and began an assessment of the risks posed by physical and chemical hazards at the site. The EPA's assessment identified arsenic (As) as the primary hazard of concern. Three main exposure routes were identified: inhalation/ingestion of mine tailings, dermal absorption/ingestion of As in lake water from swimming, and ingestion of As-contaminated ground water or surface water. Lost Lake is a private lake which is completely surrounded by low-density residential development. Prior to the dam failure, the lake was used by the local residents for swimming and boating. An estimated 1,776 people reside within one mile of the lake, and almost all residents of the area use potable groundwater for domestic use. Risk factors for human exposure to As derived from mine wastes were high enough to merit placement of the mine site and surrounding area on the National Priority List (commonly called ?Superfund?). The Lava Cap Mine Superfund site (LCMS) encompasses approximately 33 acres that include the mine site, the stretch of Little Clipper Creek between the mine and Lost Lake, the lake itself, and the area between the lake and the confluence of Little Clipper Creek with its parent stream, Clipper Creek. The area between the two creeks is named the ?deposition area? due to the estimated 24 m thick layer of tailings that were laid down there during and after active mining. The lobate structure of Lost Lake is also due to deposition in this area. The deposition area and Lost Lake are together estimated to contain 382,277 m3 of tailings. The primary goals of the EPA have been to minimize tailings movement downstream of Lost Lake and to ensure that residents in the area have drinking water that meets national water quality standards. EPA has officially decided to construct a public water supply line to deliver safe water to affected residences, since some residential wells in the area have As concentrations above the curr

  9. Geochemical Characterization of Mine Waste, Mine Drainage, and Stream Sediments at the Pike Hill Copper Mine Superfund Site, Orange County, Vermont

    Science.gov (United States)

    Piatak, Nadine M.; Seal, Robert R.; Hammarstrom, Jane M.; Kiah, Richard G.; Deacon, Jeffrey R.; Adams, Monique; Anthony, Michael W.; Briggs, Paul H.; Jackson, John C.

    2006-01-01

    The Pike Hill Copper Mine Superfund Site in the Vermont copper belt consists of the abandoned Smith, Eureka, and Union mines, all of which exploited Besshi-type massive sulfide deposits. The site was listed on the U.S. Environmental Protection Agency (USEPA) National Priorities List in 2004 due to aquatic ecosystem impacts. This study was intended to be a precursor to a formal remedial investigation by the USEPA, and it focused on the characterization of mine waste, mine drainage, and stream sediments. A related study investigated the effects of the mine drainage on downstream surface waters. The potential for mine waste and drainage to have an adverse impact on aquatic ecosystems, on drinking- water supplies, and to human health was assessed on the basis of mineralogy, chemical concentrations, acid generation, and potential for metals to be leached from mine waste and soils. The results were compared to those from analyses of other Vermont copper belt Superfund sites, the Elizabeth Mine and Ely Copper Mine, to evaluate if the waste material at the Pike Hill Copper Mine was sufficiently similar to that of the other mine sites that USEPA can streamline the evaluation of remediation technologies. Mine-waste samples consisted of oxidized and unoxidized sulfidic ore and waste rock, and flotation-mill tailings. These samples contained as much as 16 weight percent sulfides that included chalcopyrite, pyrite, pyrrhotite, and sphalerite. During oxidation, sulfides weather and may release potentially toxic trace elements and may produce acid. In addition, soluble efflorescent sulfate salts were identified at the mines; during rain events, the dissolution of these salts contributes acid and metals to receiving waters. Mine waste contained concentrations of cadmium, copper, and iron that exceeded USEPA Preliminary Remediation Goals. The concentrations of selenium in mine waste were higher than the average composition of eastern United States soils. Most mine waste was

  10. Geophysical bed sediment characterization of the Androscoggin River from the former Chlor-Alkali Facility Superfund Site, Berlin, New Hampshire, to the state border with Maine, August 2009

    Science.gov (United States)

    Degnan, James R.; Teeple, Andrew; Johnston, Craig M.; Marvin-DiPasquale, Mark C.; Luce, Darryl

    2011-01-01

    The former Chlor-Alkali Facility in Berlin, New Hampshire, was listed on the U.S. Environmental Protection Agency National Priorities List in 2005 as a Superfund site. The Chlor-Alkali Facility lies on the east bank of the Androscoggin River. Elemental mercury currently discharges from that bank into the Androscoggin River. The nature, extent, and the speciation of mercury and the production of methyl mercury contamination in the adjacent Androscoggin River is the subject of continuing investigations. The U.S. Geological Survey, in cooperation with Region I of the U.S. Environmental Protection Agency, used geophysical methods to determine the distribution, thickness, and physical properties of sediments in the Androscoggin River channel at a small area of an upstream reference reach and downstream from the site to the New Hampshire–Maine State border. Separate reaches of the Androscoggin River in the study area were surveyed with surface geophysical methods including ground-penetrating radar and step-frequency electromagnetics. Results were processed to assess sediment characteristics including grain size, electrical conductivity, and pore-water specific conductance. Specific conductance measured during surface- and pore-water sampling was used to help interpret the results of the geophysical surveys. The electrical resistivity of sediment samples was measured in the laboratory with intact pore water for comparison with survey results. In some instances, anthropogenic features and land uses, such as roads and power lines affected the detection of riverbed properties using geophysical methods; when this occurred, the data were removed. Through combining results, detailed riverbed sediment characterizations were made. Results from ground-penetrating radar surveys were used to image and measure the depth to the riverbed, depth to buried riverbeds, riverbed thickness and to interpret material-type variations in terms of relative grain size. Fifty two percent of the

  11. Investigation of off-site airborne transport of lead from a superfund removal action site using lead isotope ratios and concentrations

    Science.gov (United States)

    Pribil, Michael J.; Maddaloni, Mark A.; Staiger, Kimberly; Wilson, Eric; Magriples, Nick; Ali, Mustafa; Santella, Dennis

    2014-01-01

    Lead (Pb) concentration and Pb isotopic composition of surface and subsurface soil samples were used to investigate the potential for off-site air transport of Pb from a former white Pb processing facility to neighboring residential homes in a six block area on Staten Island, NY. Surface and subsurface soil samples collected on the Jewett White Pb site were found to range from 1.122 to 1.138 for 206Pb/207Pb and 2.393 to 2.411 for 208Pb/207Pb. The off-site surface soil samples collected from residential backyards, train trestle, near site grass patches and background areas varied from 1.144 to 1.196 for 206Pb/207Pb and 2.427 to 2.464 for 208Pb/207Pb. Two soil samples collected along Richmond Terrace, where Jewett site soils accumulated after major rain events, varied from 1.136 to 1.147 for 206Pb/207Pb and 2.407 to 2.419 for 208Pb/207Pb. Lead concentration for on-site surface soil samples ranged from 450 to 8000 ug/g, on-site subsurface soil samples ranged from 90,000 to 240,000 ug/g and off-site samples varied from 380 to 3500 ug/g. Lead concentration and isotopic composition for the Staten Island off-site samples were similar to previously published data for other northeastern US cities and reflect re-suspension and re-mobilization of local accumulated Pb. The considerable differences in both the Pb isotopic composition and Pb concentration of on-site and off-site samples resulted in the ability to geochemically trace the transport of particulate Pb. Data in this study indicate minimal off-site surface transport of Pb from the Jewett site into the neighboring residential area.

  12. Hydrogeologic framework, arsenic distribution, and groundwater geochemistry of the glacial-sediment aquifer at the Auburn Road landfill superfund site, Londonderry, New Hampshire

    Science.gov (United States)

    Degnan, James R.; Harte, Philip T.

    2013-01-01

    Leachate continues to be generated from landfills at the Auburn Road Landfill Superfund Site in Londonderry, New Hampshire. Impermeable caps on the three landfills at the site inhibit direct infiltration of precipitation; however, high water-table conditions allow groundwater to interact with landfill materials from below, creating leachate and ultimately reducing conditions in downgradient groundwater. Reducing conditions can facilitate arsenic transport by allowing it to stay in solution or by liberating arsenic adsorbed to surfaces and from geologic sources, such as glacial sediments and bedrock. The site occupies a 180-acre parcel of land containing streams, ponds, wetlands, and former gravel pits located in glacial sediment. Four areas, totaling 14 acres, including three landfills and one septage lagoon, were used for waste disposal. The site was closed in 1980 after volatile organic compounds associated with industrial waste dumping were detected. The site was added to the U.S. Environmental Protection Agency National Priority List in 1982, and the landfills were capped in 1996. Although volatile organic compound concentrations in groundwater have declined substantially, some measurable concentrations remain. Temporally variable and persistent elevated arsenic concentrations have been measured in groundwater affected by the landfill leachate. Microbial consumption of carbon found in leachate is a driver of reducing conditions that liberate arsenic at the site. In addition to sources of carbon in landfill leachate, wetland areas throughout the site also could contribute carbon to groundwater, but it is currently unknown if any of the wetland areas have downward or reversing gradients that could allow the infiltration of surface water to groundwater. Red-stained sediments and water indicate iron-rich groundwater discharge to surface water and are also associated with elevated concentrations of arsenic in sediment and groundwater. Ironrich groundwater seeps have

  13. Superfund and Toxic Release Inventory Sites - INSTITUTIONAL_CONTROLS_IDEM_IN.SHP: Institutional Control Sites in Indiana (Indiana Department of Environmental Management, Polygon Shapefile)

    Data.gov (United States)

    NSGIC State | GIS Inventory — INSTITUTIONAL_CONTROLS_IDEM_IN is a polygon shapefile that contains Institutional Control (IC) site locations in Indiana, provided by personnel of Indiana Department...

  14. The site-characterization plan and its role in resolving siting and licensing issues

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1986-01-01

    As required by the Nuclear Waste Policy Act and the Nuclear Regulatory Commission (NRC) in 10 CFR Part 60, the Department of Energy is preparing plans for conducting site characterization at three candidate sites. Prepared according to a detailed annotated outline that is based on the NRC's Regulatory Guide 4.17, these plans will present the information collected to date about the geologic, hydrologic, geochemical, geoengineering, and climatic conditions of each site; describe the design of the repository and the waste package; and discuss the site-characterization program. The most important portions of the plan will be the strategy for resolving siting and licensing issues and the description of the testing and analysis program to be followed in resolving these issues. The issues-resolution strategy consists of identifying issues and the associated information needs; allocating performance goals for various components of the repository system; developing a testing plan to gather the necessary information; gathering and analyzing the information; and documenting the results for use in site selection and licensing. The issues-resolution strategy will allow the Department to define all of the issues that must be resolved in order to demonstrate compliance with applicable regulations and to specify the information needed to resolve these issues. It will provide a consistent framework and establish priorities for the Department's site-characterization effort for the next several years

  15. SUPERFUND TREATABILITY CLEARINGHOUSE: FINAL REPORT DEMONSTRATION TEST ON-SITE PCB DESTRUCTION, SHIRCO INFRARED PORTABLE UNIT AT FLORIDA STEEL INDIANTOWN MILL SITE, INDIANTOWN, FLORIDA.

    Science.gov (United States)

    This document reports on the results of a Florida Steel Corporation study to develop and evaluate cleanup alternatives for onsite treatment of PCB contaminated soils. The results of this study aided in the selection of an approach to remediate the site. Demonstration tes...

  16. SUPERFUND TREATABILITY CLEARINGHOUSE: SOIL STABILIZATION PILOT STUDY, UNITED CHROME NPL SITE PILOT STUDY AND HEALTH AND SAFETY PROGRAM, UNITED CHROME NPL SITE PILOT STUDY

    Science.gov (United States)

    This document is a project plan for a pilot study at the United Chrome NPL site, Corvallis, Oregon and includes the health and safety and quality assurance/quality control plans. The plan reports results of a bench-scale study of the treatment process as iieasured by the ...

  17. Smart moves in superfund - revitalization one year later. Volume 1, Number 3, January 1993. Bulletin

    International Nuclear Information System (INIS)

    1993-01-01

    The issue of the Smart Moves in Superfund bulletin series provides an update on the revitalization effort, highlighting National Priorities List (NPL) construction completions, accelerating cleanup, the Superfund Accelerated Cleanup Model, risk assessment/risk management, contracts management, enforcement policy/equity, interagency cooperation, public forms, and state meetings

  18. Bioaccumulation of polychlorinated biphenyls and organochlorine pesticides in young-of-the-year bluefish (Pomatomus saltatrix) in the vicinity of a Superfund Site in New Bedford Harbor, Massachusetts, and in the adjacent waters.

    Science.gov (United States)

    Deshpande, Ashok D; Dockum, Bruce W; Cleary, Thomas; Farrington, Cameron; Wieczorek, Daniel

    2013-07-15

    Spatial gradients of polychlorinated biphenyls (PCBs) and organochlorine pesticides were examined in the young-of-the-year (YOY) bluefish (Pomatomus saltatrix) in the vicinity of a PCB Superfund Site in New Bedford Harbor, Massachusetts, and in the adjacent waters. PCB concentrations in bluefish varied between different locations, and also among fish from a given location. A generally decreasing gradient in PCB concentrations was evident as the bluefish were collected away from the Superfund Site. The average sum of PCB concentrations were highest for bluefish collected in the Upper Harbor between Interstate-195 Bridge and Coggeshall Street Bridge (Upper Harbor), followed by bluefish in Lower Harbor from north of Popes Island Bridge (Lower Harbor), and bluefish from Outer Harbor south of Hurricane Barrier (Outer Harbor). The levels of PCBs in bluefish from Clarks Cove and PCBs in bluefish from Buzzards Bay were similar and lowest among all bluefish specimens analyzed in the present study. Pesticide concentrations were about one order of magnitude or lower than the PCB concentrations, and the gradient of pesticide concentrations generally followed the gradient of PCB concentrations. Some of the commonly detected pesticides in the order of decreasing concentrations included DDTs and metabolites, heptachlor epoxide, endosulfan sulfate, and α-chlordane. Distribution of PCBs and organochlorine pesticides were examined in the tissues of YOY bluefish from Clarks Cove. PCBs and lipids in the brain samples of YOY bluefish were generally numerically greater than PCBs in the liver samples, but these differences were not statistically significant. PCBs and lipids in hypaxial muscle samples were numerically greater than PCBs in epaxial muscle samples, although these two groups of tissues were not statistically different. Despite the higher susceptibility of lighter PCB homologs to geophysical and biogeochemical weathering processes, the relative dominance of lighter homologs

  19. Hydrogeologic characterization and assessment of bioremediation of chlorinated benzenes and benzene in wetland areas, Standard Chlorine of Delaware, Inc. Superfund Site, New Castle County, Delaware, 2009-12

    Science.gov (United States)

    Lorah, Michelle M.; Walker, Charles W.; Baker, Anna C.; Teunis, Jessica A.; Emily Majcher,; Brayton, Michael J.; Raffensperger, Jeff P.; Cozzarelli, Isabelle M.

    2015-01-01

    Wetlands at the Standard Chlorine of Delaware, Inc. Superfund Site (SCD) in New Castle County, Delaware, are affected by contamination with chlorobenzenes and benzene from past waste storage and disposal, spills, leaks, and contaminated groundwater discharge. In cooperation with the U.S. Environmental Protection Agency, the U.S. Geological Survey began an investigation in June 2009 to characterize the hydrogeology and geochemistry in the wetlands and assess the feasibility of monitored natural attenuation and enhanced bioremediation as remedial strategies. Groundwater flow in the wetland study area is predominantly vertically upward in the wetland sediments and the underlying aquifer, and groundwater discharge accounts for a minimum of 47 percent of the total discharge for the subwatershed of tidal Red Lion Creek. Thus, groundwater transport of contaminants to surface water could be significant. The major contaminants detected in groundwater in the wetland study area included benzene, monochlorobenzene, and tri- and di-chlorobenzenes. Shallow wetland groundwater in the northwest part of the wetland study area was characterized by high concentrations of total chlorinated benzenes and benzene (maximum about 75,000 micrograms per liter [μg/L]), low pH, and high chloride. In the northeast part of the wetland study area, wetland groundwater had low to moderate concentrations of total chlorinated benzenes and benzene (generally not greater than 10,000 μg/L), moderate pH, and high sulfate concentrations. Concentrations in the groundwater in excess of 1 percent of the solubility of the individual chlorinated benzenes indicate that a contaminant source is present in the wetland sediments as dense nonaqueous phase liquids (DNAPLs). Consistently higher contaminant concentrations in the shallow wetland groundwater than deeper in the wetland sediments or the aquifer also indicate a continued source in the wetland sediments, which could include dissolution of DNAPLs and

  20. Superfund record of decision (EPA Region 4): Ciba-Geigy Site (McIntosh Plant), Washington County, McIntosh, AL. (Third remedial action), July 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 1,500-acre Ciba-Geigy site is an active chemical manufacturer in an industrial area in McIntosh, Washington County, Alabama. A wetlands area borders the site property, and part of the site lies within the floodplain of the Tombigbee River. In 1985, EPA issued a RCRA permit that included a corrective action plan requiring Ciba-Geigy to remove and treat ground water and surface water contamination at the site. Further investigations by EPA revealed 11 former waste management areas of potential contamination onsite. These areas contain a variety of waste, debris, pesticide by-products and residues. The ROD addresses a final remedy for OU4, which includes contaminated soil and sludge in former waste management Area 8 and the upper dilute ditch. The primary contaminants of concern affecting the soil, sludge, and debris are VOCs, including benzene, toluene, and xylenes; other organics, including pesticides; metals, including arsenic, chromium, and lead; and inorganics, including cyanide. The selected remedial action for the site are included

  1. Industrial implementation issues of Total Site Heat Integration

    International Nuclear Information System (INIS)

    Chew, Kew Hong; Klemeš, Jiří Jaromír; Wan Alwi, Sharifah Rafidah; Abdul Manan, Zainuddin

    2013-01-01

    Heat Integration has been a well-established energy conservation strategy in the industry. Total Site Heat Integration (TSHI) has received growing interest since its inception in the 90s. The methodology has been used with certain simplifications to solve TSHI problems. This paper investigates the main issues that can influence the practical implementation of TSHI in the industry. The main aim is to provide an assessment and possible guidance for future development and extension of the TSHI methodology from the industrial perspective. Several key issues have been identified as being of vital importance for the industries: design, operation, reliability/availability/maintenance, regulatory/policy and economics. Design issues to consider include plant layout, pressure drop, etc. For operation, issues such as startup and shutdown need to be considered. Reliability, availability and maintenance (RAM) are important as they directly affect the production. Relevant government policy and incentives are also important when considering the options for TSHI. Finally, a TSHI system needs to be economically viable. This paper highlights the key issues to be considered for a successful implementation of TSHI. The impacts of these issues on TS integration are summarised in a matrix, which forms a basis for an improved and closer-to-real-life implementation of the TSHI methodology. Highlights: ► Current TSHI methodology has been used for solving models with certain simplifications. ► Several issues that can influence practical implementation of TSHI are identified. ► Impacts of these issues on safety, environment and economics are evaluated. ► The findings form a basis for an improved and practical implementation of TSHI

  2. Site Features

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of various site features from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times...

  3. A strategy for end point criteria for Superfund remediation

    International Nuclear Information System (INIS)

    Hwang, S.T.

    1992-06-01

    Since the inception of cleanup for hazardous waste sites, estimating target cleanup levels has been the subject of considerable investigation and debate in the Superfund remediation process. Establishing formal procedures for assessing human health risks associated with hazardous waste sites has provided a conceptual framework for determining remediation goals and target cleanup levels (TCLs) based on human health and ecological risk consideration. This approach was once considered at variance with the concept of the pre-risk assessment period; that is, cleaning up to the background level, or using containment design or best available control technologies. The concept has been gradually adopted by the regulatory agencies and the parties responsible for cleanup. Evaluation of cleanup strategies at the outset of the planning stage will eventually benefit the parties responsible for cleanup and the oversight organizations, including regulatory agencies. Development of the strategies will provide an opportunity to promote an improvement in the pace and quality of many activities to be carried out. The strategies should help address the issues related to (1) improving remediation management activities to arrive at remediation as expeditiously as possible, (2) developing alternate remediation management activities, (3) identifying obstructing issues to management for resolution, (4) adapting the existing framework to correspond to the change in remediation statutes and guidelines, and (5) providing the basis for evaluating options for the record of decision process. This paper will discuss some of the issues and the research efforts that were addressed as part of the strategies requiring future discussion and comment

  4. Resolution of the Hanford site ferrocyanide safety issue

    International Nuclear Information System (INIS)

    Cash, R.J.; Lilga, M.A.; Babad, H.

    1997-01-01

    The Ferrocyanide Safety Issue at the Hanford Site was officially resolved in December 1996. This paper summarizes the key activities that led to final resolution of this safety hazard, a process that began in 1990 after it and other safety concerns were identified for the underground high-level waste storage tanks at the Hanford Site. At the time little was known about ferrocyanide-nitrate/nitrite reactions and their potential to cause offsite releases of radioactivity. The ferrocyanide hazard was a perceived problem, but it took six years of intense studies and analyses of tank samples to prove that the problem no longer exists. The issue revolved around the fact that ferrocyanide and nitrate mixtures can be made to explode violently if concentrated, dry, and heated to temperatures of at least 250 degrees C. The studies conducted over the last six years have shown that the combined effects of temperature, radiation, and pH during 40 or more years of storage have destroyed almost all of the ferrocyanide originally added to tanks. This was shown in laboratory experiments using simulant wastes and confirmed by actual samples taken from the ferrocyanide tanks. The tank waste sludges are now too dilute to support a sustained exothermic reaction, even if dried out and heated to high temperatures. 2 tabs., 18 refs

  5. Tenure Issues in REDD+ Pilot Project Sites in Tanzania

    Directory of Open Access Journals (Sweden)

    Therese Dokken

    2014-02-01

    Full Text Available REDD+ has been proposed as a viable option for addressing climate change in the near term, and at relatively low cost. There is a broad consensus that clearly defined tenure rights are important for the implementation and success of REDD+, both to manage forests effectively and to protect local communities’ livelihoods. We use primary data from 23 villages in six REDD+ pilot sites in Tanzania to identify causes of deforestation and forest degradation, and tenure rights issues, at the village level prior to project implementation. Further, interviews with project proponents and examination of project documents yields insights into how the proponents plan to address tenure issues. Most villages perceive their tenure as secure and have exclusion rights, while collective action challenges are prevalent in villages experiencing deforestation and forest degradation. These findings suggest that the main tenure issues are related to internal institutional arrangements. While we find that tenure is high on the agenda for all the project proponents, they are mainly focusing on formalization and securing tenure rights from state to community level. Though we do find this to be a precondition for reducing deforestation and degradation, some of their focus should be shifted to strengthening village institutions and enhancing internal compliance.

  6. Superfund XV conference proceedings. Volume 1

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This conference was held November 29--December 1, 1994 in Washington, D.C..The purpose of this conference was to provide a forum for exchange of state-of-the-art information on Superfund. Papers are included on the following topics: bioremediation; building decontamination; environmental policy issues; federal environmental restoration; groundwater remediation; innovative sampling and analytical technologies; laboratory methods; metals management; mixed wastes; PCB waste management; remediation technology and case studies; and risk assessment. Individual papers have been processed separately for inclusion in the appropriate data bases

  7. Resolving the Ferrocyanide Safety Issue at the Hanford Site

    International Nuclear Information System (INIS)

    Meacham, J.E.; Cash, R.J.; Babad, H.

    1994-02-01

    Considerable data have been obtained on the chemical and physical properties of ferrocyanide waste stored in Hanford Site single-shell tanks (SSTs). Theoretical analyses and ferrocyanide waste simulant studies have led to the development of fuel, moisture, and temperature criteria that define continued safe storage. Developing the criteria provides the technical basis for closing the Ferrocyanide Unreviewed Safety Question (USQ). Using the safety criteria, the ferrocyanide tanks have been ranked into one of three safety categories: Safe, Conditionally Safe, and Unsafe. All the ferrocyanide tanks are currently ranked in either the Safe or Conditionally Safe categories. Analyses of core samples taken from three ferrocyanide tanks have shown cyanide concentrations about a factor of ten lower than predicted by the original flowsheets. Hydrolytic and radiolytic destruction (aging) of the ferrocyanide matrix has occurred during the 35 plus years the waste has been stored at the Hanford Site. Because of waste aging, it is possible that all of the ferrocyanide tanks may now contain less than the 8 wt % sodium nickel ferrocyanide specified in the fuel criterion for the Safe category. Ferrocyanide tanks that remain in the Conditionally Safe category may require monitoring and surveillance to verify that the waste remains in an unreactive state. Further characterization of the tanks by core sampling and analyses should lead to resolution of the Ferrocyanide Safety Issue by September 1997

  8. Superfund Record of Decision (EPA Region 3): Southern Maryland Wood Treating Site, Hollywood, Maryland (first remedial action) June 1988. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1988-06-29

    The Southern Maryland Wood Treating (SMWT) site is located in Hollywood, St. Mary's County, Maryland. The site is situated within a wetland area in a drainage divide such that runoff from the site discharges into Brooks Run and McIntosh Run tributaries, which flow into the Potomac River. The area surrounding the site is predominantly used for agricultural and residential purposes. Currently, part of the site is being used as a retail outlet for pretreated lumber and crab traps. The waste generated at the site included retort and cylinder sludges, process wastes, and material spillage. These wastes were in six onsite unlined lagoons. The primary contaminants of concern affecting the onsite ground water, soil, surface water, sediments, and debris include: VOCs, PNA, and base/neutral acid extractables. The selected remedial action for the site is included.

  9. Evaluation of native microbial soil populations at a trichloroethylene contaminated Superfund site in the presence of a permeable reactive barrier (biowall) using a metagenomics approach

    Science.gov (United States)

    The Beaverdam Road Landfill occupies 3.5 acres and was an active disposal site for miscellaneous non-hazardous waste from 1943 to 1990, before being capped. In 1994, this site was included on the Nation Priorities List (NPL) for periodic inspection and remediation in accordance with the program regu...

  10. Superfund Record of Decision (EPA Region 2): Woodland Township Route 72 site, Burlington County, New Jersey (first remedial action), May 16, 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The 12-acre Woodland Route 72 Dump site is an abandoned hazardous waste dump in Woodland Township, Burlington County, New Jersey. The site is being remediated concurrently with another abandoned dump. Several chemical manufacturing firms dumped chemicals and other wastes into trenches and lagoons or burned the waste at the sites from the early 1950s to 1962. The primary contaminants of concern affecting the surface soil, sediment, sludge, debris, and ground water are VOCs including benzene, toluene, TCE and xylenes; organics including PAHs, pesticides, and phenols; radionuclides (e.g., uranium and thorium series); and metals including lead and chromium. The selected remedial action for the site includes excavation, further characterization, and offsite disposal at a permitted facility of 54,000 cubic yards (total from both sites) of contaminated surface soil, sludges, debris and sediment; offsite disposal of 19 cubic yards (total from both sites) of radiologically contaminated surface materials including a drum of radioactive pellets; ground water pumping and treatment with treatment to be determined during design. The total estimated present worth cost for the concurrent remedial actions at the Route 72 and Route 532 sites is $142,200,000

  11. Developing Sediment Remediation Goals at Superfund Sites Based on Pore Water for the Protection of Benthic Organisms from Direct Toxicity to Non-ionic Organic Contaminants

    Science.gov (United States)

    A methodology for developing remediation goals for sites with contaminated sediments is provided. The remediation goals are based upon the concentrations of chemicals in the sediment interstitial water measured using the passive sampling technique. The passive sampling technique ...

  12. Effects of changes in pumping on regional groundwater-flow paths, 2005 and 2010, and areas contributing recharge to discharging wells, 1990–2010, in the vicinity of North Penn Area 7 Superfund site, Montgomery County, Pennsylvania

    Science.gov (United States)

    Senior, Lisa A.; Goode, Daniel J.

    2017-06-06

    A previously developed regional groundwater flow model was used to simulate the effects of changes in pumping rates on groundwater-flow paths and extent of recharge discharging to wells for a contaminated fractured bedrock aquifer in southeastern Pennsylvania. Groundwater in the vicinity of the North Penn Area 7 Superfund site, Montgomery County, Pennsylvania, was found to be contaminated with organic compounds, such as trichloroethylene (TCE), in 1979. At the time contamination was discovered, groundwater from the underlying fractured bedrock (shale) aquifer was the main source of supply for public drinking water and industrial use. As part of technical support to the U.S. Environmental Protection Agency (EPA) during the Remedial Investigation of the North Penn Area 7 Superfund site from 2000 to 2005, the U.S. Geological Survey (USGS) developed a model of regional groundwater flow to describe changes in groundwater flow and contaminant directions as a result of changes in pumping. Subsequently, large decreases in TCE concentrations (as much as 400 micrograms per liter) were measured in groundwater samples collected by the EPA from selected wells in 2010 compared to 2005‒06 concentrations.To provide insight on the fate of potentially contaminated groundwater during the period of generally decreasing pumping rates from 1990 to 2010, steady-state simulations were run using the previously developed groundwater-flow model for two conditions prior to extensive remediation, 1990 and 2000, two conditions subsequent to some remediation 2005 and 2010, and a No Pumping case, representing pre-development or cessation of pumping conditions. The model was used to (1) quantify the amount of recharge, including potentially contaminated recharge from sources near the land surface, that discharged to wells or streams and (2) delineate the areas contributing recharge that discharged to wells or streams for the five conditions.In all simulations, groundwater divides differed from

  13. Access control issues and solutions for large sites

    International Nuclear Information System (INIS)

    Warren, F.E.

    1992-07-01

    The Lawrence Livermore National Laboratory (LLNL) operates an automated access control system consisting of more than 100 portals. We have gained considerable practical experience in the issues involved in operating this large system, and have identified the central issues to include system reliability, the large user population, the need for central control, constant change, high visibility and the budget. This paper outlines these issues and draws from our experience to discuss some fruitful ways of addressing them

  14. AHR-related activities in a creosote-adapted population of adult atlantic killifish, Fundulus heteroclitus, two decades post-EPA superfund status at the Atlantic Wood Site, Portsmouth, VA USA

    Energy Technology Data Exchange (ETDEWEB)

    Wojdylo, Josephine V. [Department of Biological Sciences, Environmental Toxicology Graduate Program, Clemson University, Clemson, SC 29634 (United States); Vogelbein, Wolfgang [The College of William & Mary, Gloucester Point, VA 23062 (United States); Bain, Lisa J. [Department of Biological Sciences, Environmental Toxicology Graduate Program, Clemson University, Clemson, SC 29634 (United States); Rice, Charles D., E-mail: cdrice@clemson.edu [Department of Biological Sciences, Environmental Toxicology Graduate Program, Clemson University, Clemson, SC 29634 (United States)

    2016-08-15

    Highlights: • AHR-related activities in creosote-adapted adult killifish were examined. • Creosote-adapted adult killifish have elevated intestine CYP1A. • Creosote-adapted adult killifish have elevated liver COX2 mRNA expression. • Most creosote-adapted adult killifish have lesions varying in severity. • Liver lesions in creosote-adapted adult killifish express CYP1A and AHR2 proteins. - Abstract: Atlantic killifish, Fundulus heteroclitus, are adapted to creosote-based PAHs at the US EPA Superfund site known as Atlantic Wood (AW) on the southern branch of the Elizabeth River, VA USA. Subsequent to the discovery of the AW population in the early 1990s, these fish were shown to be recalcitrant to CYP1A induction by PAHs under experimental conditions, and even to the time of this study, killifish embryos collected from the AW site are resistant to developmental deformities typically associated with exposure to PAHs in reference fish. Historically, however, 90 +% of the adult killifish at this site have proliferative hepatic lesions including cancer of varying severity. Several PAHs at this site are known to be ligands for the aryl hydrocarbon receptor (AHR). In this study, AHR-related activities in AW fish collected between 2011 and 2013 were re-examined nearly 2 decades after first discovery. This study shows that CYP1A mRNA expression is three-fold higher in intestines of AW killifish compared to a reference population. Using immunohistochemistry, CYP1A staining in intestines was uniformly positive compared to negative staining in reference fish. Livers of AW killifish were examined by IHC to show that CYP1A and AHR2 protein expression reflect lesions-specific patterns, probably representing differences in intrinsic cellular physiology of the spectrum of proliferative lesions comprising the hepatocarcinogenic process. We also found that COX2 mRNA expression levels were higher in AW fish livers compared to those in the reference population, suggesting a

  15. Superfund record of decision (EPA Region 4): Potter's septic tank service pits site, Brunswick County, Sandy Creek, NC. (First remedial action), August 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 5-acre Potter's Septic Tank Service Pits (Potter's Pits) is located in a rural section of Brunswick County, North Carolina. The site is situated within a residential community known as the Town of Sandy Creek. Disposal practices consisted of placing petroleum waste products and septic tank sludges either in shallow unlined pits or directly on the land surface. The ROD addresses the ground water treatment and contaminated soils at the site. Primary contaminants of concern affecting surface and subsurface soil are VOCs and semi-VOCs, including napthalene, metals, and pesticides. Ground water is contaminated with VOCs, including benzene, ethyl benzene, toluene; other organics including naphthalene, and xylenes; and metals, including chromium and lead. The selected remedial action for the site includes excavating all soils that exceed the soil clean-up standards; treating contaminated soils by using an onsite ex-situ thermal desorption process; performing secondary treatment of the concentrated organic contaminants, and sampling and analyzing the treatment residue

  16. Superfund Record of Decision (EPA Region 4): Maxey Flats Nuclear Disposal site, Fleming County, KY. (First remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 280-acre Maxey Flats Nuclear Disposal site is an inactive low-level radioactive waste disposal facility in Fleming County, Kentucky. The estimated 663 people who reside within 2.5 miles of the site use the public water supply for drinking purposes. From 1962 to 1977, Nuclear Engineering Company, Inc. (NECO), operated a solid by-product, source, and special nuclear material disposal facility under a license with the State. Several State investigations in the 1970's revealed that leachate contaminated with tritium and other radioactive substances was migrating from the disposal trenches to unrestricted areas. The Record of Decision (ROD) addresses final remediation of soil, debris, and associated leachate. The primary contaminants of concern affecting the soil and debris are VOCs including benzene, TCE, and toluene; metals including arsenic and lead; and radioactive materials. The selected remedial action for the site is included

  17. Superfund record of decision (EPA Region 4): Whitehouse Waste Oil Pits Site, Duval County, Jacksonville, FL. (First remedial action), (Amendment), June 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 7-acre Whitehouse Waste Oil Pits site was used by Allied Petroleum Products (Allied) to dispose of acidic waste oil sludges from its oil reclamation process in Whitehouse, Duval County, Florida. A cypress swamp system and residential area are immediately adjacent to the site. The acid sludge produced in the first step and clay used to decolorize the oil were dumped into the unlined pits at the site. A 1985 ROD addressed source control as a containment remedy consisting of a slurry wall construction, soil cap, and a ground water recovery and treatment system; however, EPA has re-evaluated the 1985 ROD selection and determined that the containment remedy failed to meet the requirements of SARA. As a result, the ROD Amendment focuses on an alternative for treating Whitehouse wastes by eliminating direct contact risk associated with pit soil/sludge wastes and preventing contaminated ground water in the surficial aquifer from migrating laterally. The primary contaminants of concern that affect the soil, sediment, surface water, and ground water are VOCs, including benzene, toluene, and xylenes; organics, including PCBs and phenols; and metals, including arsenic, chromium, and lead. The amended remedial action for the site are included

  18. PCBs and DDE in Tree Swallow (Tachycineta bicolor) Eggs and Nestlings from an Estuarine PCB Superfund Site, New Bedford Harbor, MA, U.S.A.

    Science.gov (United States)

    While breeding tree swallows (Tachycineta bicolor) have been used as biomonitors for freshwater sites, we report the first use of this species to assess the transfer of breeding ground contaminants from an estuarine system. Eggs and nestlings were collected from nest boxes locat...

  19. Evolving issues in the prevention of surgical site infections.

    LENUS (Irish Health Repository)

    Quinn, A

    2009-06-01

    Surgical site infection is one of the more common causes of post-operative morbidity. Such infections contribute to prolonged recovery, delayed discharge and increasing costs to both patients and the health service. In the current climate increased emphasis is being placed on minimising the risks of acquiring or transmitting these nosocomial infections. This article reviews the current literature obtained from a Pubmed database search in relation to three specific aspects of surgical site infection: compliance with prophylactic antibiotics, post-discharge surveillance and novel methods for preventing surgical site infections. These topics represent areas where many institutions will find room for improvement in the prevention of surgical site infections. Tight adherence to prophylactic antibiotic guidelines, close followup of surgical wounds during and after hospital discharge, and attention to oxygenation status and the body temperature of patients may all prove to be useful adjuncts in significantly decreasing surgical site infections.

  20. Superfund Record of Decision (EPA Region 5): Buckeye Reclamation Landfill Site, Belmont County, OH. (First remedial action), August 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 658-acre Buckeye Reclamation site contains a 50-acre former landfill in Richland Township, Belmont County, Ohio. Land use in the area is predominantly agricultural, rural residential, and strip mining. A total of 46 domestic wells and springs are located within 1 mile of the site. The original topography of the valley has been altered by coal mining and landfill operations. Solid industrial wastes also were disposed of with municipal wastes elsewhere in the landfill. In 1980, the Waste Pit was filled with sludge, mine spoil, and overburden soil; covered with soil and garbage; and seeded. Results of the RI indicate various levels of contamination in all media sampled, except air. The Record of Decision (ROD) addresses the remediation of contaminated leachate and ground water and eliminates exposure to contaminated surface soil. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, TCE, and toluene; other organics including PAHs; and metals including arsenic, chromium, beryllium, and lead. The selected remedial action for the site is included

  1. The regional issues involved in the siting of power stations

    International Nuclear Information System (INIS)

    Livingstone, R.

    1980-01-01

    This paper deals with the regional implications of power station siting in England and Wales and refers to the procedures used by the CEGB to find and develop sites. The resources required for a power station are outlined both for conventional and nuclear stations and the possible development of uses for the rejected heat from power stations as a result of the energy crisis is discussed. (U.K.)

  2. CERCLIS (Superfund) ASCII Text Format - CPAD Database

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database (CPAD) contains a selected set...

  3. Superfund record of decision (EPA Region 4): Savannah River Site (USDOE) D-Area Oil Seepage Basin (631-G), Aiken, SC, August 14, 1998

    International Nuclear Information System (INIS)

    1999-03-01

    The D-Area Oil Seepage Basin (D-Area OSB) Operable Unit (OU) is listed as a Resource Conservation and Recovery Act (RCRA) 3004(u) Solid Waste Management Unit/Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) unit in Appendix C of the Federal Facility Agreement (FFA) for the Savannah River Site (SRS). No Action is the selected remedy for shallow soil, surface water and sediment, because no constituents of concern (COCs) were identified for them in the RCRA Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA). The selected remedy for D-Area OSB groundwater is Alternative GW-2: Natural Attenuation/Groundwater Mixing Zone (GWMZ) with Institutional Controls

  4. Plan for addressing issues relating to oil shale plant siting

    Energy Technology Data Exchange (ETDEWEB)

    Noridin, J. S.; Donovan, R.; Trudell, L.; Dean, J.; Blevins, A.; Harrington, L. W.; James, R.; Berdan, G.

    1987-09-01

    The Western Research Institute plan for addressing oil shale plant siting methodology calls for identifying the available resources such as oil shale, water, topography and transportation, and human resources. Restrictions on development are addressed: land ownership, land use, water rights, environment, socioeconomics, culture, health and safety, and other institutional restrictions. Descriptions of the technologies for development of oil shale resources are included. The impacts of oil shale development on the environment, socioeconomic structure, water availability, and other conditions are discussed. Finally, the Western Research Institute plan proposes to integrate these topics to develop a flow chart for oil shale plant siting. Western Research Institute has (1) identified relative topics for shale oil plant siting, (2) surveyed both published and unpublished information, and (3) identified data gaps and research needs. 910 refs., 3 figs., 30 tabs.

  5. Delineation of areas having elevated electrical conductivity, orientation and characterization of bedrock fractures, and occurrence of groundwater discharge to surface water at the U.S. Environmental Protection Agency Barite Hill/Nevada Goldfields Superfund site near McCormick, South Carolina

    Science.gov (United States)

    Chapman, Melinda J.; Huffman, Brad A.; McSwain, Kristen Bukowski

    2015-07-16

    During October 2012 through March 2013, the U.S. Geological Survey (USGS), in cooperation with the U.S. Environmental Protection Agency (EPA) Region 4, Superfund Section, conducted borehole geophysical logging, surface geophysical surveys, and water-quality profiling in selected wells and areas to characterize or delineate the extent of elevated subsurface electrical conductivity at the EPA Barite Hill/Nevada Goldfields Superfund site near McCormick, South Carolina. Elevated electrical conductivity measured at the site may be related to native rock materials, waste rock disposal areas used in past operations, and (or) groundwater having elevated dissolved solids (primarily metals and major ions) related to waste migration. Five shallow screened wells and four open-borehole bedrock wells were logged by using a suite of borehole tools, and downhole water-quality profiles were recorded in two additional wells. Well depths ranged from about 26 to 300 feet below land surface. Surface geophysical surveys based on frequency-domain electromagnetic and distributed temperature sensing (DTS) techniques were used to identify areas of elevated electrical conductivity (Earth materials and groundwater) and potential high dissolved solids in groundwater and surface water on land and in areas along the northern unnamed tributary at the site.

  6. Superfund Record of Decision (EPA Region 9): North Hollywood/Burbank Well Field Area 1, San Fernando Valley Site, California (first remedial action), September 1987. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-24

    The North Hollywood - Burbank Well Field (NHBWF) is located within the San Fernando Valley Ground Water basin, which can provide drinking water for approximately 500,000 people residing in the San Fernando Valley and Los Angeles. In 1980 TCE and PCE were discovered in 25% of DWP's wells. In July 1981, DWP and the Southern California Association of Governments began a two-year study funded by EPA. The study revealed the occurrence of ground-water contamination plume patterns that are spreading toward the southeast. The primary contaminant of concern to the ground-water is TCE with PCE and other VOCs present. The selected remedial action for the site is ground-water pump and treatment using aeration and granular-activated-carbon - air-filtering units, with discharge to the DWP Pumping Station for chlorination and distribution. Spent carbon will be removed and replaced with fresh carbon, with the spent carbon scheduled either for disposal or regeneration. The estimated capital cost for this remedial action is $2,192,895 with present worth OandM of $2,284,105.

  7. Superfund Green Remediation

    Science.gov (United States)

    Green remediation is the practice of considering all environmental effects of site cleanup and incorporating options – like the use of renewable energy resources – to maximize the environmental benefits of cleanups.

  8. FUSRAP adapts to the amendments of Superfund

    International Nuclear Information System (INIS)

    Atkin, R.G.; Liedle, S.D.; Clemens, B.W.

    1988-01-01

    With the promulgation of the Superfund Amendments and Reauthorization Act (SARA) federal facilities were required to comply with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) in the same manner as any non-government entity. This situation presented challenges for the Department of Energy (DOE) and other federal agencies involved in remedial action work because of the requirements under SARA that overlap other laws requiring DOE compliance, e.g., the National Environmental Policy Act (NEPA). This paper outlines options developed to comply with CERCLA and NEPA as part of an active, multi-site remedial action program. The program, the Formerly Utilized Sites Remedial Action Program (FUSRAP), was developed to identify, clean up, or control sites containing residual radioactive contamination resulting from the nation's early development of nuclear power. During the Manhattan Project, uranium was extracted from domestic and foreign ores and resulted in mill concentrates, purified metals, and waste products that were transported for use or disposal at other locations. Figure 1 shows the steps for producing uranium metal during the Manhattan Project. As a result of these activities materials equipment, buildings, and land became contaminated, primarily with naturally occurring radionuclides. Currently, FUSRAP includes 29 sites; three are on the Environmental Protection Agency's (EPA's) National Priorities List (NPL) of hazardous waste sites

  9. Site Area Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of site boundaries from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  10. Confined Site Construction: A qualitative investigation of critical issues affecting management of Health and Safety

    OpenAIRE

    Spillane, John P.; Oyedele, Lukumon O.; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E.; Tijani, Iyabo K.

    2011-01-01

    The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, th...

  11. Cleaning up DOE's weapons sites: Issues of organization and management

    International Nuclear Information System (INIS)

    Morzinski, J.A.

    1994-01-01

    Many Department of Energy facilities across the United States are seriously contaminated with radioactive and other hazardous wastes. Decades of focus on weapons production and inadequate attention to long-term solutions for dealing with those wastes have resulted in tremendous problems. The Department of Energy recognizes the seriousness of those problems and is addressing them. In some cases existing management systems are being used to accomplish the new mission of environmental cleanup, and in other cases new systems have been created to help carry out that mission. Widespread criticism of those efforts to data are evidence that the management systems being used may not be appropriate for the job. In particular, it appears that some management systems aren't producing desired results because they are not well aligned with the people and tasks for whom they are intended, and these issues are discussed in this report

  12. National priorities list sites: Wisconsin, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  13. National priorities list sites: Wyoming, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  14. National priorities list sites: New York, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  15. National priorities list sites: Delaware, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  16. National priorities list sites: North Carolina, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  17. National priorities list sites: Oklahoma, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  18. National priorities list sites: New Mexico, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  19. Shaft sealing issue in CO2 storage sites

    Science.gov (United States)

    Dieudonné, A.-C.; Charlier, R.; Collin, F.

    2012-04-01

    Carbon capture and storage is an innovating approach to tackle climate changes through the reduction of greenhouse gas emissions. Deep saline aquifers, depleted oil and gas reservoirs and unmineable coal seams are among the most studied reservoirs. However other types of reservoir, such as abandonned coal mines, could also be used for the storage of carbon dioxide. In this case, the problem of shaft sealing appears to be particularly critical regarding to the economic, ecologic and health aspects of geological storage. The purpose of the work is to study shaft sealing in the framework of CO2 storage projects in abandoned coal mines. The problem of gas transfers around a sealing system is studied numerically using the finite elements code LAGAMINE, which has been developped for 30 years at the University of Liege. A coupled hydro-mechanical model of unsaturated geomaterials is used for the analyses. The response of the two-phase flow model is first studied through a simple synthetic problem consisting in the injection of gas in a concrete-made column. It stands out of this first modeling that the advection of the gas phase represents the main transfer mechanism of CO2 in highly unsaturated materials. Furthermore the setting of a bentonite barrier seal limits considerably the gas influx into the biosphere. A 2D axisymetric hydromechanical modeling of the Anderlues natural gas storage site is then performed. The geological and hydrogeological contexts of the site are used to define the problem, for the initial and boundary conditions, as well as the material properties. In order to reproduce stress and water saturation states in the shale before CO2 injection in the mine, different phases corresponding to the shaft sinking, the mining and the set up of the sealing system are simulated. The system efficiency is then evaluated by simulating the CO2 injection with the imposed pressure at the shaft wall. According to the modeling, the low water saturation of concrete and

  20. D Webgis and Visualization Issues for Architectures and Large Sites

    Science.gov (United States)

    De Amicis, R.; Conti, G.; Girardi, G.; Andreolli, M.

    2011-09-01

    Traditionally, within the field of archaeology and, more generally, within the cultural heritage domain, Geographical Information Systems (GIS) have been mostly used as support to cataloguing activities, essentially operating as gateways to large geo-referenced archives of specialised cultural heritage information. Additionally GIS have proved to be essential to help cultural heritage institutions improve management of their historical information, providing the means for detection of otherwise hard-to-discover spatial patterns, supporting with computation tools necessary to perform spatial clustering, proximity and orientation analysis. This paper presents a platform developed to answer to both the aforementioned issues, by allowing geo-referenced cataloguing of multi-media resources of cultural relevance as well as access, in a user-friendly manner, through an interactive 3D geobrowser which operates as single point of access to the available digital repositories. The solution has been showcased in the context of "Festival dell'economia" (the Fair of Economics) a major event recently occurred in Trento, Italy and it has allowed visitors of the event to interactively access an extremely large repository of information, as well as their metadata, available across the area of the Autonomous Province of Trento, in Italy. Within the event, an extremely large repository was made accessible, via the network, through web-services, from a 3D interactive geobrowser developed by the authors. The 3D scene was enriched with a number of Points of Interest (POIs) linking to information available within various databases. The software package was deployed with a complex hardware set-up composed of a large composite panoramic screen covering a horizontal field of view of 240 degrees.

  1. Wetland restoration and compliance issues on the Savannah River site

    International Nuclear Information System (INIS)

    Wein, G.R.; McLeod, K.W.; Sharitz, R.R.

    1993-01-01

    Operation of the nuclear production reactors on the Savannah River Site has faced potential conflicts with wetland regulations on several occasions. This paper provides two examples in which regulatory compliance and restoration research have been meshed, providing both compliance and better knowledge to aid future regulatory needs. The decision to restart the L reactor required the mitigation of thermal effluents under Sec. 316 of the Clean Water Act. The National Pollutant Discharge Elimination System, permit for the selected mitigation alternative, a 405-ha once-through cooling reservoir, required the establishment of a balanced biological community (BBC) within the lake. To promote the development of a BBC, the reservoir was seeded with water from an existing BBC (Par Pond) and stocked with fish and had artificial reefs constructed. The US Department of Energy (DOE) also requested that the Savannah River Ecology Laboratory establish littoral/wetland vegetation along the shoreline to provide aquatic and wildlife habitat, shoreline stabilization, and a good faith effort toward the establishment of a BBC. The development of wetland vegetation was deemed important to the successful development of a BBC within L Lake. However, in a similar cooling reservoir system constructed in 1957 (Par Pond), wetland vegetation successfully developed without any planting effort. Other than the good faith effort toward a BBC, there is no reason to assume a littoral/wetland community would not develop of its own accord. However, research conducted at L Lake indicates that the planting of wetland vegetation at L Lake accelerated the process of natural selection over that of areas that were not planted

  2. Hydrostratigraphy, soil/sediment chemistry, and water quality, Potomac-Raritan-Magothy aquifer system, Puchack Well Field Superfund site and vicinity, Pennsauken Township, Camden County, New Jersey, 1997-2001

    Science.gov (United States)

    Barringer, Julia L.; Walker, Richard L.; Jacobsen, Eric; Jankowski, Pamela

    2010-01-01

    Drinking-water supplies from the Potomac-Raritan-Magothy aquifer system at the Puchack well field in Pennsauken Township, Camden County, New Jersey, have been contaminated by hexavalent chromium-the most toxic and mobile form-at concentrations exceeding the New Jersey maximum contaminant level of 100 micrograms per liter. Also, scattered but widespread instances of volatile organic compounds (primarily trichloroethylene) at concentrations that exceed their respective maximum contaminant levels in the area's ground water have been reported. Because inorganic and organic contaminants are present in the ground water underlying the Puchack well field, no water from there has been withdrawn for public supply since 1998, when the U.S. Environmental Protection Agency (USEPA) added the area that contains the Puchack well field to the National Priorities List. As part of the USEPA's investigation of the Puchack Well Field Superfund site, the U.S. Geological Survey (USGS) conducted a study during 1997-2001 to (1) refine previous interpretations of the hydrostratigraphic framework, hydraulic gradients, and local directions of ground-water flow; (2) describe the chemistry of soils and saturated aquifer sediments; and (3) document the quality of ground water in the Potomac-Raritan-Magothy aquifer system in the area. The four major water-bearing units of the Potomac-Raritan-Magothy aquifer system-the Upper aquifer (mostly unsaturated in the study area), the Middle aquifer, the Intermediate Sand (a local but important unit), and the Lower aquifer-are separated by confining units. The confining units contain areas of cut and fill, resulting in permeable zones that permit water to pass through them. Pumping from the Puchack well field during the past 3 decades resulted in downward hydraulic gradients that moved contaminants into the Lower aquifer, in which the production wells are finished, and caused ground water to flow northeast, locally. A comparison of current (1997

  3. Issues in clustered nuclear siting: a comparison of a hypothetical nuclear energy center in New Jersey with dispersed nuclear siting

    International Nuclear Information System (INIS)

    Meier, P.M.; Morell, D.

    1976-09-01

    The report is an analysis of a hypothetical nuclear energy center (NEC) conducted in support of the recently completed study by the Nuclear Regulatory Commission, mandated by the Congress in the Energy Reorganization Act of 1974. The intent of the analysis of the hypothetical, or ''surrogate'', site was to inject a local and regional perspective into the assessment of technical, environmental, institutional, and socioeconomic issues which could be adequately addressed only by reference to a specific site. The hypothetical NEC site in Ocean County, New Jersey, was chosen to illustrate the problems and impacts of potential energy centers in coastal and near-coastal sites in relatively close proximity to large metropolitan areas. Earlier studies of hypothetical energy centers on the Mississippi River at River Bend, La., and on the Columbia River near Hanford, Washington, were also re-examined for their relevance to this new study effort. Neither Ocean County, nor any of the other surrogate sites, have been considered for actual construction of an NEC, nor does their selection for study purposes imply any judgement of desirability. Indeed, the major finding of the report presented is that Ocean County is a relatively poor location for an energy center, and this may well be true of many coastal locations similar to the Jersey shore. The objective in selecting surrogate sites, then, was not to find the best locations, but to select sites that would illustrate the broadest range of potential public policy and siting issues

  4. Status report on resolution of Waste Tank Safety Issues at the Hanford Site. Revision 1

    International Nuclear Information System (INIS)

    Dukelow, G.T.; Hanson, G.A.

    1995-05-01

    The purpose of this report is to provide and update the status of activities supporting the resolution of waste tank safety issues and system deficiencies at the Hanford Site. This report provides: (1) background information on safety issues and system deficiencies; (2) a description of the Tank Waste Remediation System and the process for managing safety issues and system deficiencies; (3) changes in safety issue description, prioritization, and schedules; and (4) a summary of the status, plans, order of magnitude, cost, and schedule for resolving safety issues and system deficiencies

  5. Impact of liability and site closure and long-term care issues on future siting efforts

    International Nuclear Information System (INIS)

    Carlin, E.M.; Hana, S.L.A.

    1988-01-01

    Washington's research in the area of financial responsibility for liability and cleanup for radioactive materials licensees and low-level radioactive waste permittees is offered to assist unsited states and regions in their planning and development of new low-level waste disposal capacity. The state considered the need for third party bodily injury and property damage financial responsibility and determined that the USDOT requirements comprehensively cover transport of wastes. In regard to licensees' facilities, it is the state's opinion that an adequate technical basis for third party requirements has not yet been developed. Also considered was the need for financial assurance for cleanup, which is covered for transportation, but generally not available for facilities. Three options are examined to provide such coverage, and the economic impact on licensees assessed. Finally, the current low-level waste disposal site operator's insurance coverage is analyzed and deficiencies are identified. Washington is also conducting research into site closure and perpetual care and maintenance requirements for the commercial low-level radioactive waste disposal facility located on the Hanford reservation near Richland, Washington. This research includes a site assessment and identification and formulation of site-specific design elements for closure and long-term care

  6. Influence of economic factor and site milestones on the salience of environmental issues at Department of Energy sites

    International Nuclear Information System (INIS)

    O'Connor, S.; Yin, J.

    1997-01-01

    The change in the US Department of Energy's (DOE) mission from nuclear weapons production to remediation and restoration of its installations, in 1989, challenged all citizens around the nation's weapons complex to get involved in DOE's environmental management decision-making process. The purpose of this study is to determine whether, and to what extent, economic factors and site milestones influence the rise and fall of environmental issues and participation. One might believe that citizen participation would be influenced by economic conditions, particularly with the down-sizing that occurred at many DOE sites. Another factor that might influence salience of environmental issues is the occurrence of crucial events, or site milestones. Important events occurring at DOE installations are well publicized by local and national media, and citizens' interest and opinions are influenced by media. In this study, the authors use the number of comments expressed by the public and Indian tribes as a measure of public involvement and salience of issues. Their study, using multiple regression analysis, examined the relationships between the number of comments expressed and the economic conditions as indicated by monthly unemployment rates, and the relationship between the number of comments expressed and the occurrence of crucial site events or milestones

  7. High-level radioactive waste disposal: Key geochemical issues and information needs for site characterization

    International Nuclear Information System (INIS)

    Brooks, D.J.; Bembia, P.J.; Bradbury, J.W.; Jackson, K.C.; Kelly, W.R.; Kovach, L.A.; Mo, T.; Tesoriero, J.A.

    1986-01-01

    Geochemistry plays a key role in determining the potential of a high-level radioactive waste disposal site for long-term radionuclide containment and isolation. The Nuclear Regulatory Commission (NRC) has developed a set of issues and information needs important for characterizing geochemistry at the potential sites being investigated by the Department of Energy Basalt Waste Isolation Project, Nevada Nuclear Waste Storage Investigations project, and Salt Repository Project. The NRC site issues and information needs consider (1) the geochemical environment of the repository, (2) changes to the initial geochemical environment caused by construction and waste emplacement, and (3) interactions that affect the transport of waste radionuclides to the accessible environment. The development of these issues and information needs supports the ongoing effort of the NRC to identify and address areas of geochemical data uncertainty during prelicensing interactions

  8. National priorities list sites: The United States Territories, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  9. National priorities list sites: Puerto Rico and Virgin Islands, 1992

    International Nuclear Information System (INIS)

    1992-12-01

    The publication provides general Superfund background information and descriptions of activities at each State National Priorities List (NPL) site. It clearly describes what the problems are, what EPA and others participating in site cleanups are doing, and how the nation can move ahead in solving these serious problems. Compiles site summary fact sheets on each State site being cleaned up under the Superfund Program

  10. Superfund TIO videos: Set A. Settlement tools and practices, win-win negotiations, closeout, records management, authorities and liabilities. Part 5. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into 5 sections. Section 1 provides an overview of settlement activities including conducting an information exchange, issuing general notice letters, initiating special notice procedures, receiving good faith offers (GFO), negotiating and settlements, and pursuing enforcement actions. Section 2 covers the types of negotiations that commonly involve OSCs and RPMs. The characteristics of a negotiating style that satisfy all the parties as well as methods for preparing and conducting this type of negotiation are outlined. Section 3 deals with post-removal site control arrangements and other closeout requirements for a removal site, such as completing necessary paperwork. The remedial project closeout procedures also are covered, including the remedial closeout report, operation and maintenance (O ampersand M) arrangements, transfer of site responsibility, and deletion from the National Priorities List (NPL). Section 4 discusses the purpose, procedures, roles and responsibilities associated with records management under Superfund. Section 5 outlines the response authority provided by CERCLA to OCSs and RPMs

  11. Program plan for evaluation of the Ferrocyanide Waste Tank safety issue at the Hanford Site

    International Nuclear Information System (INIS)

    Borsheim, G.L.; Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1994-03-01

    This document describes the background, priorities, strategy and logic, and task descriptions for the Ferrocyanide Waste Tank Safety Program. The Ferrocyanide Safety Program was established in 1990 to provide resolution of a major safety issue identified for 24 high-level radioactive waste tanks at the Hanford Site

  12. Holistic approach to multi-unit site risk assessment: Status and Issues

    International Nuclear Information System (INIS)

    Kim, Inn Seock; Jang, Mi Suk; Kim, Seoung Rae

    2017-01-01

    The events at the Fukushima Daiichi Nuclear Power Station in March 2011 point out, among other matters, that concurrent accidents at multiple units of a site can occur in reality. Although site risk has been deterministically considered to some extent in nuclear power plant siting and design, potential occurrence of multi-unit accident sequences at a site was not investigated in sufficient detail thus far in the nuclear power community. Therefore, there is considerable worldwide interest and research effort directed toward multi-unit site risk assessment, especially in the countries with high-density nuclear-power-plant sites such as Korea. As the technique of probabilistic safety assessment (PSA) has been successfully applied to evaluate the risk associated with operation of nuclear power plants in the past several decades, the PSA having primarily focused on single-unit risks is now being extended to the multi-unit PSA. In this paper we first characterize the site risk with explicit consideration of the risk associated with spent fuel pools as well as the reactor risks. The status of multi-unit risk assessment is discussed next, followed by a description of the emerging issues relevant to the multi-unit risk evaluation from a practical standpoint

  13. Holistic approach to multi-unit site risk assessment: Status and Issues

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Inn Seock; Jang, Mi Suk; Kim, Seoung Rae [Nuclear Engineering Service and Solution Company (NESS), Daejeon Business Agency, Daejeon (Korea, Republic of)

    2017-03-15

    The events at the Fukushima Daiichi Nuclear Power Station in March 2011 point out, among other matters, that concurrent accidents at multiple units of a site can occur in reality. Although site risk has been deterministically considered to some extent in nuclear power plant siting and design, potential occurrence of multi-unit accident sequences at a site was not investigated in sufficient detail thus far in the nuclear power community. Therefore, there is considerable worldwide interest and research effort directed toward multi-unit site risk assessment, especially in the countries with high-density nuclear-power-plant sites such as Korea. As the technique of probabilistic safety assessment (PSA) has been successfully applied to evaluate the risk associated with operation of nuclear power plants in the past several decades, the PSA having primarily focused on single-unit risks is now being extended to the multi-unit PSA. In this paper we first characterize the site risk with explicit consideration of the risk associated with spent fuel pools as well as the reactor risks. The status of multi-unit risk assessment is discussed next, followed by a description of the emerging issues relevant to the multi-unit risk evaluation from a practical standpoint.

  14. Resolution of the ferrocyanide safety issue for the Hanford site high-level waste tanks

    International Nuclear Information System (INIS)

    Cash, R.J.

    1996-01-01

    This paper describes the approach used to resolve the ferrocyanide safety issue, a process that began in 1990 after heightened concern was expressed by various government agencies about the safety of Hanford site high-level waste tanks. At the time, little was known about ferrocyanide-nitrate/nitrite reactions and the potential for offsite releases of radioactivity from the Hanford Site. Recent studies have shown that the combined effects of temperature, radiation, and pH during more than 38 years of storage have destroyed most of the ferrocyanide originally added to tanks. This has been proven in the laboratory using flowsheet-derived waste simulants and confirmed by waste samples obtained from the ferrocyanide tanks. The resulting tank waste sludges are too dilute to support a sustained exothermic reaction, even if dried out and heated to temperatures of at least 250 C. The US Department of Energy (DOE) has been requested to close the ferrocyanide safety issue

  15. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Science.gov (United States)

    2010-07-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  16. Superfund record of decision (EPA Region 2): Carroll and Dubies Sewage Disposal, Port Jervis, Town of Deerpark, Orange County, NY, September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This decision document presents the selected remedial action for the contaminated groundwater at the Carroll and Dubies Superfund Site (the Site). This operable unit represents the second of two operable units planned for the Site. It addresses the contaminated groundwater underlying and downgradient of the Carroll and Dubies site.

  17. Facilitating Site Specific and Citizens Advisory Boards: Running Effective Meetings that Involve Complex Technical Issues

    International Nuclear Information System (INIS)

    Freeman, J.

    2009-01-01

    Environmental cleanup issues at federal sites are more often than not on the agendas of meetings of the Site Specific Advisory Boards (SSABs), also called Citizens Advisory Boards (CABs), that exist at most U.S. Department of Energy (DOE) sites with an Environmental Management (EM) mission. In 1994, when Congress established these committees comprised of local citizens, it enabled community stakeholders to become more directly involved in DOE EM cleanup decisions. This involvement is to help the agency make cost-effective and environmentally sound decisions which lead to faster, safer cleanups. Eight local Boards that fall under the Federal Advisory Committee Act-chartered EM SSAB charter are found in Hanford, Washington; Idaho; Northern New Mexico; Nevada; Oak Ridge, Tennessee; Paducah, Kentucky; Portsmouth, Ohio; and at the Savannah River Site in South Carolina. These boards provide advice and recommendations about EM site-specific issues such as cleanup standards (how clean is clean?), environmental restoration, waste management, the stabilization and disposal of non-stockpile nuclear materials, future land use and long-term stewardship, risk assessment and management, and cleanup science and technology activities. These issues are, by their very nature, loaded with complicated technical terms and strategies, scientific data and interpretations, and long histories of studies and reports. The members of SSABs and CABs rotate on and off the Boards according to defined terms of office, thereby routinely opening the Boards' ranks to new members, many of whom are new to the issues. In addition, members of the public who have access to public comment periods at each Board meeting run up against the same daunting menu of obscure acronyms, scientific terms and notations, and an historical trail which is not always evident except to those involved with the issues over many years. How does a facilitator effectively guide such a group of citizens, each of whom arrives to

  18. Use of a web site to increase knowledge and awareness of hunger-related issues.

    Science.gov (United States)

    Jennings, Sharla; Cotugna, Nancy; Vickery, Connie E

    2003-11-01

    The purpose of this study was to determine the current level of knowledge and awareness of hunger-related issues among a convenience sample of Delawareans. We also assessed whether raising knowledge and awareness of the hunger problem through the FBD's newly designed web site would encourage participation in antihunger activities. Via e-mail, 1,719 individuals were invited to participate in a three-phase, online survey, and 392 agreed. Phase-I questions were answered prior to viewing the web site, phase II (n=217) immediately afterward, and phase III (n=61) six weeks later. Responses indicated a high level of awareness about general hunger issues but specific knowledge proved to be at a lower level. No statistically significant differences were noted when data were collapsed across gender, age, educational level, or work setting. In a six-week post-survey, 41% of subjects were motivated by the web site to engage in an antihunger activity; 34% had told others about the web site and indicated it may be a useful tool in antihunger outreach efforts for the FBD.

  19. Use of a web site to increase knowledge and awareness of hunger-related issues.

    Science.gov (United States)

    Jennings, Sharla; Cotugna, Nancy; Vickery, Connie E.

    2003-01-01

    The purpose of this study was to determine the current level of knowledge and awareness of hunger-related issues among a convenience sample of Delawareans. We also assessed whether raising knowledge and awareness of the hunger problem through the FBD's newly designed web site would encourage participation in antihunger activities. Via e-mail, 1,719 individuals were invited to participate in a three-phase, online survey, and 392 agreed. Phase-I questions were answered prior to viewing the web site, phase II (n=217) immediately afterward, and phase III (n=61) six weeks later. Responses indicated a high level of awareness about general hunger issues but specific knowledge proved to be at a lower level. No statistically significant differences were noted when data were collapsed across gender, age, educational level, or work setting. In a six-week post-survey, 41% of subjects were motivated by the web site to engage in an antihunger activity; 34% had told others about the web site and indicated it may be a useful tool in antihunger outreach efforts for the FBD. PMID:14651376

  20. Superfund record of decision (EPA Region 2): Carroll and Dubies Sewage Disposal, Port Jervis, NY, March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This decision document presents the selected remedial action for the Carroll and Dubies Superfund Site (the Site). This operable unit (OU1) represents the first of two operable units planned for the Site. This operable unit addresses the source areas (lagoons and surrounding impacted soils) at the Site and actions needed to ensure that the source areas do not pose a threat to human health or the environment, including any potential cross media impacts to groundwater.

  1. Developing and Maintaining Official Government Agencies Web site - Issues and Challenges

    International Nuclear Information System (INIS)

    Mohd Fauzi Haris; Mohd Hasnor Hasan; Nuruliza Samsudin

    2011-01-01

    In the era where Internet technology has grown rapidly, information is now at your fingertips. Web site is considered as an important medium and widely used whether for the purposes of promoting products and services or as an effective way to disseminate general information about the organization, companies or individuals. Nowadays, a general term such as Web 2.0 is almost out of date and is now entering the era of the Real World Web. For government agencies for instance, official web site is an important and effective tool for dissemination and communication of information to the public. In the view of Web master for a government agency, a number of issues and challenges may arise. They might face the same issues and challenges but they way to handle them are differ from one agency to another, depending on the culture, special rules and regulations applied and shared values among the staff. This paper will discuss these issues and challenges as well as applicable solutions based on our experiences. (author)

  2. Safeguards issues of long-term waste management at DOE sites

    International Nuclear Information System (INIS)

    Pillay, K.K.S.

    1992-06-01

    Waste management at US Department of Energy (DOE) sites is not often regarded as a safeguard-sensitive step in the nuclear fuel cycle because the material concerned is relatively unattractive for diversion or theft. However, the accumulation of large amounts of fissile materials in wastes over a period of time can be a safeguards concern. One estimate shows that high-level and transuranic wastes and some miscellaneous radioactive materials at DOE sites may contain as much as 15 Mt of fissile materials. In the context of present US strategies for the disposal of these radioactive wastes, this study identifies safeguards issues relevant to proposed scenarios for the long-term management and permanent disposal of the above-mentioned waste forms in geologic repositories. This study points out areas of concern and the need to examine the issues before the wastes are processed for geologic disposal. Good waste management practices may offer unique opportunities to address the safeguards issues identified here. A judicious approach to examining the safeguards requirements of waste disposal programs may also contribute to DOE's new effort to establish and maintain public confidence in its environmental restoration programs

  3. Issues relating to the siting of tritium-fueled fusion experiments

    International Nuclear Information System (INIS)

    Reilly, H.J.; Holland, D.F.

    1985-01-01

    A preconceptual design study and safety analysis of the Tokamak Fusion Core Experiment (TFCX) was conducted in 1984 for the Department of Energy. This paper summarizes the calculations and comparisons related to TFCX siting and environmental issues such as radiological doses to the public living near the facility. Included are discussions of (a) routine and accidental releases of tritium, (b) routine releases of activated air, (c) direct radiation (including ''skyshine''), and (d) seismic criteria. Other potential issues are also discussed including the amount of tritium that might be retained in the graphite armor in the torus, the possible severity of magnet accidents, and the extent of damage due to plasma disruptions. The conclusions drawn from these calculations should be applicable to some of the other planned ignited core experiments that have operating parameters similar to those of TFCX

  4. Issues relating to the siting of tritium-fueled fusion experiments

    International Nuclear Information System (INIS)

    Reilly, H.J.; Holland, D.F.

    1985-01-01

    A preconceptual design study and safety analysis of the Tokamak Fusion Core Experiment (TFCX) was conducted in 1984 for the Department of Energy. This paper summarizes the calculations and comparisons related to TFCX siting and environmental issues such as radiological doses to the public living near the facility. Included are discussions of (a) routine and accidental releases of tritium, (b) routine releases of activated air, (c) direct radiation (including skyshine), and (d) seismic criteria. Other potential issues are also discussed including the amount of tritium that might be retained in the graphite armor in the torus, the possible severity of magnet accidents, and the extent of damage due to plasma disruptions. The conclusions drawn from these calculations should be applicable to some of the other planned ignited core experiments that have operating parameters similar to those of TFCX

  5. Proposed nomination of sites for site characterization and recommendation of issues for environmental assessments and site characterization plans. Technical report. Summary of issues and concerns expressed during the April-May 1983 US Department of Energy public hearings

    International Nuclear Information System (INIS)

    1983-09-01

    As required by Section 112(b)(2) of the Nuclear Waste Policy Act (Public Law 97-425), the US Department of Energy (DOE) conducted a series of nine formal public hearings during April and May 1983 in local communities in the vicinity of seven identified potentially acceptable salt sites and in the state capitals of the States of Louisiana, Mississippi, Texas, and Utah. The public hearings focused on the proposed nomination of the Vacherie Dome site in Louisiana; the Richton and Cypress Creek Salt Dome sites in Mississippi; the Deaf Smith County and Swisher County bedded salt sites in Texas; and the Davis and Lavender Canyon bedded salt sites in Utah. The issues expressed during area public hearings are summarized in this document, which serves as a digest of and as an index to the public hearing records of each of the four salt states. Specifically, almost 1100 paraphrased public hearing comments are identified and grouped into 62 subjects within the following nine general topical areas: NWTS Program Planning Process, Consultation and Cooperation, Engineering/Repository Design, Geology, Hydrology, Transportation, Public Health and Safety, Environmental Quality, and Socioeconomics

  6. Superfund Training/Tech Transfer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes a collection of information resources, training, and other media related to hazardous waste site cleanup and characterization. A major part of...

  7. 77 FR 4559 - Ecusta Mill Site, Pisgah Forest, Transylvania County, NC; Notice of Amended Settlement

    Science.gov (United States)

    2012-01-30

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-R4-SFUND 2012-; FRL-9624-1] Ecusta Mill Site, Pisgah Forest... settlement for resolution of past response and future costs concerning the Ecusta Mill Superfund Site located... settlement are available from Ms. Paula V. Painter. Submit your comments by Site name Ecusta Mill Superfund...

  8. Review of institutional and socioeconomic issues for radioactive waste repository siting

    International Nuclear Information System (INIS)

    Copenhaver, E.D.; Carnes, S.A.; Soderstrom, E.J.; Sorensen, J.H.; Peelle, E.; Bjornstad, D.J.

    1982-01-01

    In recent years, the importance of social and institutional issues in the siting of radioactive waste management repositories has been recognized. This study deals with the possibility of using incentives to assist in siting repositories and outlines some of their uses, limitations, and preconditions. Limited survey data and other studies indicate that incentives may help encourage people to formulate positive positions on radioactive waste repositories. In an overall siting strategy, incentives are just one part of a structured process involving the creation of a mutually acceptable set of arrangements that make certain guarantees and confer certain benefits in exchange for the acceptance of the proposed facility. Because the range of needs to be fulfilled is varied, a package of incentives is likely to be more acceptable than any one single incentive. The purpose of incentives is to encourage local approval by minimizing and redressing costs and providing missing benefits. Most previous discussions of incentives have emphasized mitigation mechanisms only. This paper also identifies compensation, incentives, and criteria by which compensation or an incentive system can be evaluated. The study provides the means by which incentives can be identified, assessed, negotiated, and implemented by affected parties and attempts to show where incentives fit into an overall siting strategy by developing a classification scheme and an analytical framework that capture: (1) the preconditions that must exist before any incentive system can be considered; (2) the objective features of an incentive; such as adequacy and ease of administration; (3) community perceptions of an incentive, such as interpretability and relevance; and (4) the consequences of implementing an incentive, such as distributional effects and conflict and consensus. 38 references, 1 figure, 2 tables

  9. Societal and Political Issues of Site Selection Process Development for the LILW Repository in Slovenia

    Energy Technology Data Exchange (ETDEWEB)

    Polic, Marko; KoS, Drago [Univ. of Ljubljana (Slovenia); Zeleznik, Nadja [ARAO, Ljubljana (Slovenia)

    2006-09-15

    The siting of the radioactive waste repository, even the low and intermediate level radioactivity waste (LILW), presents a great problem in almost every country that produces these materials. Attempts to locate a disposal facility in Slovenia have until now proven unsuccessful. After the failure of the first 'technocratic' approach it became evident that the main problem was not a technical one, but socio-psychological, namely the public acceptability of any radioactive waste disposal facility (RWD). In general people strongly oppose to any kind of such a facility in their vicinity and exhibit a 'Not in my Backyard' (NIMBY) attitude even if they are aware of its necessity. However there are slight signs of changes especially in argumentation supporting the public denial of LIL RWD. The main LILW producer in Slovenia is nuclear power plant in Krsko (NEK). The project for the construction of this plant did not include consideration of the LIL RWD while at that time plans for new NPP's in Yugoslavia with a centralized LILW repository were present. The search for possible locations of LILW repository started only after the beginning of its commercial operation in 1983. The general development of radioactive waste management (RWM) issue in Slovenia was similar to the development in other developed countries, while its details and context differ in smaller or greater degree due to different cultural, political, social and economic backgrounds. The RWM process was following the same general course: technological approach neglecting public issues - public reactance - move toward public involvement. All this was accompanied by the relevant public attitudes: neutrality - rejection - eventual conditional public acceptance. The procedure to find a LILW repository is proposed and established, but the processes leading to final solution are going on without being completely foreseen yet. The general underlying view is connected to the fear of

  10. Societal and Political Issues of Site Selection Process Development for the LILW Repository in Slovenia

    International Nuclear Information System (INIS)

    Polic, Marko; KoS, Drago; Zeleznik, Nadja

    2006-01-01

    The siting of the radioactive waste repository, even the low and intermediate level radioactivity waste (LILW), presents a great problem in almost every country that produces these materials. Attempts to locate a disposal facility in Slovenia have until now proven unsuccessful. After the failure of the first 'technocratic' approach it became evident that the main problem was not a technical one, but socio-psychological, namely the public acceptability of any radioactive waste disposal facility (RWD). In general people strongly oppose to any kind of such a facility in their vicinity and exhibit a 'Not in my Backyard' (NIMBY) attitude even if they are aware of its necessity. However there are slight signs of changes especially in argumentation supporting the public denial of LIL RWD. The main LILW producer in Slovenia is nuclear power plant in Krsko (NEK). The project for the construction of this plant did not include consideration of the LIL RWD while at that time plans for new NPP's in Yugoslavia with a centralized LILW repository were present. The search for possible locations of LILW repository started only after the beginning of its commercial operation in 1983. The general development of radioactive waste management (RWM) issue in Slovenia was similar to the development in other developed countries, while its details and context differ in smaller or greater degree due to different cultural, political, social and economic backgrounds. The RWM process was following the same general course: technological approach neglecting public issues - public reactance - move toward public involvement. All this was accompanied by the relevant public attitudes: neutrality - rejection - eventual conditional public acceptance. The procedure to find a LILW repository is proposed and established, but the processes leading to final solution are going on without being completely foreseen yet. The general underlying view is connected to the fear of radioactivity and general negative

  11. Hinkley Point 'C' power station public inquiry: proof of evidence on local site related issues

    International Nuclear Information System (INIS)

    Gammon, K.M.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom, adjacent to an existing nuclear power station. The CEGB evidence to the Inquiry on local site related issues begins by setting the proposed development within the context of local authority planning policies for the area. The implications of the development in terms of overall land needs, construction, access, buildings and works both temporary and permanent, are described. Environmental impacts, aesthetic and socio-economic factors are considered including possible effects on agriculture, nature conservation, water supply, transport and employment. (UK)

  12. Potential Nuclear Power Plant Siting Issues in the United Arab Emirates

    International Nuclear Information System (INIS)

    Al Hanai, Waddah T.

    2011-01-01

    Based on the need to develop additional sources of electricity to meet future demand and to ensure the rapid growth of its economy, the United Arab Emirates has embarked on a nuclear programme. The Federal Law by Decree No. 6 of 2009, Concerning the Peaceful Uses of Nuclear Energy was signed by the President, last fall. This law created the Federal Authority for Nuclear Regulation (FANR), which is developing the framework of regulations which will guide the UAE programme. This paper reviews the development of the FANR regulation on Siting and the related environmental issues in general and those unique to the area. This will include steps being planned by the Authority to review the license application and the current concepts being looked at for the inspection programme. Among the unique aspects the author will look at are the results from a recent in-depth study performed on dust and sand storms. (author)

  13. 75 FR 49414 - Cooperative Agreements and Superfund State Contracts for Superfund Response Actions

    Science.gov (United States)

    2010-08-13

    ...-0276. FOR FURTHER INFORMATION CONTACT: Angelo Carasea, Assessment and Remediation Division, Office of Superfund Remediation and Technology Innovation, (5204P), Environmental Protection Agency, 1200 Pennsylvania... funds to a State, political subdivision, or Indian Tribe that assumes responsibility as the lead or...

  14. Independent technical review of Savannah River Site Defense Waste Processing Facility technical issues

    International Nuclear Information System (INIS)

    1992-07-01

    The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) will vitrify high-level radioactive waste that is presently stored as liquid, salt-cake, and sludge in 51 waste-storage tanks. Construction of the DWPF began in 1984, and the Westinghouse Savannah Company (WSRC) considers the plant to be 100% turned over from construction and 91% complete. Cold-chemical runs are scheduled to begin in November 1992, and hot start up is projected for June 1994. It is estimated that the plant lifetime must exceed 15 years to complete the vitrification of the current, high-level tank waste. In a memo to the Assistant Secretary for Defense Programs (DP-1), the Assistant Secretary for Environmental Restoration and Waste management (EM-1) established the need for an Independent Technical Review (ITR), or the Red Team, to ''review process technology issues preventing start up of the DWPF.'' This report documents the findings of an Independent Technical Review (ITR) conducted by the Department of Energy (DOE), Office of Environmental Restoration and Waste Management (EM), at the request of the Assistant Secretary for Environmental Restoration and Waste Management, of specified aspects of Defense Waste Process Facility (DWPF) process technology. Information for the assessment was drawn from documents provided to the ITR Team by the Westinghouse Savannah River Company (WSRC), and presentations, discussions, interviews, and tours held at the Savannah River Site (SRS) during the weeks of February and March 9, 1992

  15. The StreamCat Dataset: Accumulated Attributes for NHDPlusV2 (Version 2.1) Catchments for the Conterminous United States: Facility Registry Services (FRS) : Toxic Release Inventory (TRI) , National Pollutant Discharge Elimination System (NPDES) , and Superfund Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset represents the estimated density of georeferenced sites within individual, local NHDPlusV2 catchments and upstream, contributing watersheds based on the...

  16. Issues and recent advances in optimal experimental design for site investigation (Invited)

    Science.gov (United States)

    Nowak, W.

    2013-12-01

    This presentation provides an overview over issues and recent advances in model-based experimental design for site exploration. The addressed issues and advances are (1) how to provide an adequate envelope to prior uncertainty, (2) how to define the information needs in a task-oriented manner, (3) how to measure the expected impact of a data set that it not yet available but only planned to be collected, and (4) how to perform best the optimization of the data collection plan. Among other shortcomings of the state-of-the-art, it is identified that there is a lack of demonstrator studies where exploration schemes based on expert judgment are compared to exploration schemes obtained by optimal experimental design. Such studies will be necessary do address the often voiced concern that experimental design is an academic exercise with little improvement potential over the well- trained gut feeling of field experts. When addressing this concern, a specific focus has to be given to uncertainty in model structure, parameterizations and parameter values, and to related surprises that data often bring about in field studies, but never in synthetic-data based studies. The background of this concern is that, initially, conceptual uncertainty may be so large that surprises are the rule rather than the exception. In such situations, field experts have a large body of experience in handling the surprises, and expert judgment may be good enough compared to meticulous optimization based on a model that is about to be falsified by the incoming data. In order to meet surprises accordingly and adapt to them, there needs to be a sufficient representation of conceptual uncertainty within the models used. Also, it is useless to optimize an entire design under this initial range of uncertainty. Thus, the goal setting of the optimization should include the objective to reduce conceptual uncertainty. A possible way out is to upgrade experimental design theory towards real-time interaction

  17. QA issues for site hydrochemical data used for groundwater evolution models

    Energy Technology Data Exchange (ETDEWEB)

    Savage, D. [Quintessa Ltd., Nottingham (United Kingdom); Miller, B. [QuantiSci Ltd., Melton Mowbray (United Kingdom); Sasamoto, Hiroshi; Yui, Mikazu [Japan Nuclear Cycle Development Inst., Tokai Works, Tokai, Ibaraki (Japan)

    1999-06-01

    Groundwater data used for modelling site or repository evolution need to be assessed for their quality and whether they are 'fit for purpose', prior to utilization. This report discuss factors and issues which impinge upon the quality of such data. It is recommended that geochemical modelleres: are aware of how groundwater samples were collected, whether during drilling, during hydraulic testing, or thereafter, by in-situ measurement, pumped from boreholes, or by pressurised sampler; are aware of what procedures (if any) were used to 'correct' samples for drill fluid contamination and what errors were associated with those methods; are aware of whether samples were subject to de-pressurisation during sampling, and whether geochemical modelling techniques were applied to correct the compositions of samples for that process; request different measures of redox activity (e.g., electrode measurements of Eh, concentrations of different redox-sensitive aqueous species) to be applied to key groundwater samples to investigate the extent of redox equilibrium; are aware of how groundwater samples were filtered and preserved for off-site analysis; ensure that adequate methods of groundwater filtration (< 0.1 {mu}m) and chemical analysis are applied to ensure accurate and reproducible analyses for dissolved aluminum at low levels of concentration (generally less than 0.2 mg/L); are aware of elemental errors and detection limits in chemical analysis of groundwater samples and assess the quality of groundwater analyses via ion exchange balances and via a comparison of measured and calculated values for total dissolved solids contents; ensure that detailed mineralogical analysis is carried out on rock samples from locations where key groundwater samples have been extracted. (author)

  18. QA issues for site hydrochemical data used for groundwater evolution models

    International Nuclear Information System (INIS)

    Savage, D.; Miller, B.; Sasamoto, Hiroshi; Yui, Mikazu

    1999-06-01

    Groundwater data used for modelling site or repository evolution need to be assessed for their quality and whether they are 'fit for purpose', prior to utilization. This report discuss factors and issues which impinge upon the quality of such data. It is recommended that geochemical modelleres: are aware of how groundwater samples were collected, whether during drilling, during hydraulic testing, or thereafter, by in-situ measurement, pumped from boreholes, or by pressurised sampler; are aware of what procedures (if any) were used to 'correct' samples for drill fluid contamination and what errors were associated with those methods; are aware of whether samples were subject to de-pressurisation during sampling, and whether geochemical modelling techniques were applied to correct the compositions of samples for that process; request different measures of redox activity (e.g., electrode measurements of Eh, concentrations of different redox-sensitive aqueous species) to be applied to key groundwater samples to investigate the extent of redox equilibrium; are aware of how groundwater samples were filtered and preserved for off-site analysis; ensure that adequate methods of groundwater filtration (< 0.1 μm) and chemical analysis are applied to ensure accurate and reproducible analyses for dissolved aluminum at low levels of concentration (generally less than 0.2 mg/L); are aware of elemental errors and detection limits in chemical analysis of groundwater samples and assess the quality of groundwater analyses via ion exchange balances and via a comparison of measured and calculated values for total dissolved solids contents; ensure that detailed mineralogical analysis is carried out on rock samples from locations where key groundwater samples have been extracted. (author)

  19. THE SITE DEMONSTRATION OF CHEMFIX SOLIDIFICATION/ STABILIZATION PROCESS AT THE PORTABLE EQUIPMENT SALVAGE COMPANY SITE

    Science.gov (United States)

    A demonstration of the GHEMFIX solidification/stabilization process was conducted under the United States Environmental Protection Agency`s (EPA) Superfund Innovative Technology Evaluation (SITE) program. The demonstration was conducted in March 1989, at the Portable Equipment Sa...

  20. Some issues on radiological consequences analysis in site selection for nuclear power stations

    International Nuclear Information System (INIS)

    Chen Xiaoqiu; Yue Huiguo

    2006-01-01

    The three considerations, Site safety and environmental protection and emergency preparedness, are the focus of attention in the evaluation of the suitability of a site for nuclear power station. This paper summarized the basic regulatory requirements for the siting of nuclear power station, described the existing problems on radiological consequences analyses during the siting stage and discussed the is- sues that need to concern in the reviewing of the radiological consequences analyses in the siting appraisal stage. (authors)

  1. Implementation of an ex situ stabilization technique at the Sand Springs superfund site to solidify and stabilize acid tar sludges involving a quick-lime based stabilization process and innovative equipment design

    International Nuclear Information System (INIS)

    McManus, R.W.; Grajczak, P.; Wilcoxson, J.C.; Webster, S.D.

    1997-01-01

    An old refinery site was safely remediated a year before schedule and for 25% less than final engineering estimates for the stabilization remedy thanks to energetic project management and innovative design involving ex situ stabilization/solidification of acid tar sludges. A quicklime based process, Dispersion by Chemical Reaction (DCR trademark), was employed to solidify and stabilize (SS) over 103,000 cubic meters (135,000 cubic yards) of petroleum waste, mostly acidic tarry sludge. The SS process was selected over competing methods because it afforded minimal volume increase, could readily achieve Record of Decision (ROD) specified physical and chemical treatment goals, could be implemented with treatment equipment that minimized emissions, and could be performed with low reagent usage and at low cost. To ensure treatment goals were achieved and an accelerated schedule met, a custom designed and fabricated transportable treatment unit (TTU) was employed to implement the process. The treated material was visually soil-like in character, it was left in stockpiles for periods of time, and it was placed and compacted in the on site landfill using standard earth-moving equipment

  2. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Standard Chlorine of Delaware Superfund Site in Delaware City, Delaware. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-06-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Standard Chlorine of Delaware site in Delaware City, Delaware, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  3. Analysis of Critical Issues in Biosphere Assessment Modelling and Site Investigation

    Energy Technology Data Exchange (ETDEWEB)

    Egan, M.J.; Thorne, M.C.; Little, R.H.; Pasco, R.F. [Quintessa Limited, Henley-on-Thames (United Kingdom)

    2003-07-01

    The aim of this document is to present a critical review of issues concerned with the treatment of the biosphere and geosphere-biosphere interface in long-term performance assessment studies for nuclear waste disposal in Sweden. The review covers three main areas of investigation: a review of SKB's plans for undertaking site investigations at candidate locations for the development of a deep geological repository for spent fuel; identification of critical uncertainties associated with SKB's treatment of the geosphere-biosphere interface in recent performance assessments; and a preliminary modelling investigation of the significance of features, events and processes in the near-surface environment in terms of their effect on the accumulation and redistribution of radionuclides at the geosphere-biosphere interface. Overall, SKB's proposals for site investigations are considered to be comprehensive and, if they can be carried out to the specification presented, will constitute a benchmark that other waste management organisations will have to work hard to emulate. The main concern is that expertise for undertaking the investigations and reporting the results could be stretched very thin. The authors have also identified weaknesses in the documentation concerning the collection of evidence for environmental change and on developing scenarios for future environmental change. A fundamental assumption adopted in the renewed assessment of the SFR 1 repository, which is not discussed or justified in any of the documentation that has been reviewed, is that radionuclides enter the water column of the coastal and lake models directly, without passing first through the bed sediments. The modelling study reported herein suggests that SKB's models are robust to range of alternative conceptual descriptions relating to the geosphere-biosphere interface. There are however situations, in which contaminated groundwater is released via sediment rather than directly

  4. Analysis of Critical Issues in Biosphere Assessment Modelling and Site Investigation

    International Nuclear Information System (INIS)

    Egan, M.J.; Thorne, M.C.; Little, R.H.; Pasco, R.F.

    2003-07-01

    The aim of this document is to present a critical review of issues concerned with the treatment of the biosphere and geosphere-biosphere interface in long-term performance assessment studies for nuclear waste disposal in Sweden. The review covers three main areas of investigation: a review of SKB's plans for undertaking site investigations at candidate locations for the development of a deep geological repository for spent fuel; identification of critical uncertainties associated with SKB's treatment of the geosphere-biosphere interface in recent performance assessments; and a preliminary modelling investigation of the significance of features, events and processes in the near-surface environment in terms of their effect on the accumulation and redistribution of radionuclides at the geosphere-biosphere interface. Overall, SKB's proposals for site investigations are considered to be comprehensive and, if they can be carried out to the specification presented, will constitute a benchmark that other waste management organisations will have to work hard to emulate. The main concern is that expertise for undertaking the investigations and reporting the results could be stretched very thin. The authors have also identified weaknesses in the documentation concerning the collection of evidence for environmental change and on developing scenarios for future environmental change. A fundamental assumption adopted in the renewed assessment of the SFR 1 repository, which is not discussed or justified in any of the documentation that has been reviewed, is that radionuclides enter the water column of the coastal and lake models directly, without passing first through the bed sediments. The modelling study reported herein suggests that SKB's models are robust to range of alternative conceptual descriptions relating to the geosphere-biosphere interface. There are however situations, in which contaminated groundwater is released via sediment rather than directly to the water column

  5. Hydrogeologic framework, hydrology, and refined conceptual model of groundwater flow for Coastal Plain aquifers at the Standard Chlorine of Delaware, Inc. Superfund Site, New Castle County, Delaware, 2005-12

    Science.gov (United States)

    Brayton, Michael J.; Cruz, Roberto M.; Myers, Luke; Degnan, James R.; Raffensperger, Jeff P.

    2015-01-01

    From 1966 to 2002, activities at the Standard Chlorine of Delaware chemical facility in New Castle County, Delaware resulted in the contamination of groundwater, soils, and wetland sediment. In 2005, the U.S. Geological Survey (USGS), in partnership with the U.S. Environmental Protection Agency, Region 3, and the Delaware Department of Natural Resources and Environmental Control began a multi-year investigation of the hydrogeologic framework and hydrology of the confined aquifer system. The goals of the ongoing study at the site (the Potomac Aquifer Study) are to determine the hydraulic connection between the Columbia and Potomac aquifers, determine the direction of groundwater flow in the Potomac aquifer, and identify factors affecting the fate of contaminated groundwater. This report describes progress made towards these goals based on available data collected through September 2012.

  6. In-Depth Case Studies of Superfund Reuse

    Science.gov (United States)

    SRI’s in-depth case studies explore Superfund reuse stories from start to finish. Their purpose is to see what redevelopment strategies worked, acknowledge reuse barriers and understand how communities overcame the barriers to create new reuse outcomes.

  7. Privacy Impact Assessment for the Enforcement Superfund Tracking System

    Science.gov (United States)

    This Enforcement Superfund Tracking System (ESTS) collects publicly available information from the California Secretary of State on businesses. Learn how this data is collected, how it will be used, access to the data, and the purpose of data collection.

  8. Human Health Toxicity Values in Superfund Risk Assessments

    Science.gov (United States)

    This memorandum revises the hierarchy of human health toxicity values generally recommended for use inr isk assessments, originally presented in Risk Assessment Guidance for Superfund Volume I, Part A.

  9. Oil and gas property transfers: Analyzing the environmental risk through the environmental site assessment process

    International Nuclear Information System (INIS)

    Bratberg, D.; Hocker, S.

    1994-01-01

    The Superfund Act made anyone buying contaminated real estate liable for cleanup costs whether they know about the contamination or contributed to the contamination. In 1986, SARA amended the Superfund Act to include a provision known as the ''Innocent Landowner Defense.'' This provision created a defense for purchasers of contaminated property who did not contribute to the contamination and had no reason to believe that the property was contaminated at the time of the real estate transfer. SARA allows the purchasers and lenders to perform an environmental assessment using ''due diligence'' to identify contamination problems existing at a site. Since the passing of SARA, the environmental site assessment (ESA) process has become commonplace during the transfer of commercial real estate. Since the introduction of SARA, many professional associations, governmental agencies, and proposed federal legislation have struggled to produce a standard for conducting Phase 1 ESAs. Only recently has a standard been produced. Until recently, the domestic oil and gas industry has been relatively unconcerned about the Superfund liability issues. This approach was created by Congress's decision in 1980 to temporarily exempt the majority of oil and gas exploration and production wastes from federal hazardous waste rulings. However, new stringent rules governing oil and gas waste management practices are being considered by federal and state regulatory agencies. Based upon this knowledge and the awakening of public awareness, the use of ESAs for oil and gas transactions is increasing

  10. Measurement and monitoring technologies are important SITE program component

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    An ongoing component of the Superfund Innovative Technologies Evaluation (SITE) Program, managed by the US EPA at its Hazardous Waste Engineering Research Laboratory in Cincinnati, is the development and demonstration of new and innovative measurement and monitoring technologies that will be applicable to Superfund site characterization. There are four important roles for monitoring and measurement technologies at Superfund sites: (1) to assess the extent of contamination at a site, (2) to supply data and information to determine impacts to human health and the environment, (3) to supply data to select the appropriate remedial action, and (4) to monitor the success or effectiveness of the selected remedy. The Environmental Monitoring Systems Laboratory in Las Vegas, Nevada (EMSL-LV) has been supporting the development of improved measurement and monitoring techniques in conjunction with the SITE Program with a focus on two areas: Immunoassay for toxic substances and fiber optic sensing for in-situ analysis at Superfund sites

  11. Triad Issue Paper: Using Geophysical Tools to Develop the Conceptual Site Model

    Science.gov (United States)

    This technology bulletin explains how hazardous-waste site professionals can use geophysical tools to provide information about subsurface conditions to create a more representative conceptual site model (CSM).

  12. Superfund at work: Hazardous waste cleanup efforts nationwide, fall 1992. (CIBA-GEIGY Corporation, McIntosh, Alabama)

    International Nuclear Information System (INIS)

    1992-01-01

    On March 31, 1992, the U.S. Environmental Protection Agency (EPA) reached an agreement with Ciba-Geigy Corporation in McIntosh, Alabama to clean up soil and ground water contaminated by DDT, herbicides, and chemicals. The agreement is one of the largest private party settlements in Superfund history, valued at approximately $120 million. EPA activities at the site included: conducting preliminary contamination investigations jointly with the Alabama Environmental Health Administration, beginning in 1979; designing a multi-phased cleanup that is responsive to the complex nature of the contamination and reduces potential risk to the local population and environment; and awarding a grant to a community group to help them participate in cleanup decisions. Ciba-Geigy, like EPA, has made consistent efforts to build and maintain good relations with the community. These efforts demonstrate the increasing trend toward cooperation between industries, local communities, and EPA at Superfund sites

  13. The Livelihoods of Nara Palace Local Residents: Site Conservation Issues and Solutions

    OpenAIRE

    WANG, Dongdong; 王, 冬冬

    2017-01-01

    Nara Palace is an important location in the history of Japanese archaeological site conservation because conservation work here started early, the project is large scale, and a number of participants are involved. The history of conservation at this site went passed through a number of complex stages over more than a century, including initial discovery, calls for protection, damage, initiation of a conservation movement, designation as a historic site, acquisition of land by the Japanese gov...

  14. [Urban industrial contaminated sites: a new issue in the field of environmental remediation in China].

    Science.gov (United States)

    Liao, Xiao-Yong; Chong, Zhong-Yi; Yan, Xiu-Lan; Zhao, Dan

    2011-03-01

    Contamination of urban industrial lands is a new environmental problem in China during the process of upgrade of industrial structure and adjustment of urban layout. It restricts the safe re-use of urban land resources, and threatens the health of surrounding inhabitants. In the paper, the market potential of contaminated-site remediation was known through analysis of spatial distribution of urban industrial sites in China. Remediation technologies in the Occident which were suitable for urban industrial contaminated sites were discussed and compared to evaluate their superiority and inferiority. And then, some advices of remediation technologies for urban industrial contaminated sites in China were proposed.

  15. DEMONSTRATION OF AQUAFIX AND SAPS PASSIVE MINE WATER TREATMENT TECHNOLOGIES AT SUMMITVILLE MINE SITE, INNOVATIVE TECHNOLOGY EVALUATION REPORT

    Science.gov (United States)

    As part of the Superfund Innovative Technology Evaluation (SITE) Program, the U.S. Environmental Protection Agency evaluated two passive water treatment (PWT) technologies for metals removal from acid mine drainage (AMD) at the Summitville Mine Superfund Site in southern Colorado...

  16. Information report on nuclear safety and radiation protection of the Tricastin AREVA site - Issue 2012

    International Nuclear Information System (INIS)

    2013-06-01

    Published in compliance with the French code of the environment, this report first presents different aspects of the Areva's Tricastin site which comprises five basic nuclear installations or INBs, and seven ICPE (installation classified for the protection of the environment). The activities are dedicated to uranium conversion, uranium enrichment, uranium chemistry, industrial services, and fuel manufacturing. The report presents this important industrial site, describes the various measures regarding nuclear safety and radiation protection, reports nuclear events which occurred on this site and had to be declared, reports the management of releases by this site and the control of the environment. The next part addresses the management of the various wastes produced by the different installations present on this site. The management of other impacts is also reported. The last chapter reviews the actions undertaken in the field of transparency and information

  17. Nuclear Energy Center Site Survey, 1975. Part IV. Practical issues of implementation

    International Nuclear Information System (INIS)

    1976-01-01

    The objective of Part IV is to assemble, organize, and present facts, analyses, and responsible viewpoints with respect to issues going beyond technical and technical-economic tradeoff considerations that bear on NECs; to identify options; and to analyze and comment on merits of alternative options. Five broad groups of issues addressed include jurisdictional and institutional; economic; social and political; accident risk; national security; and nuclear material safeguards

  18. Climate and climate-related issues for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    The purpose of this report is to document current scientific knowledge on climate and climate-related conditions, relevant to the long-term safety of a KBS-3 repository, to a level required for an adequate treatment in the safety assessment SR-Site. The report also presents a number of dedicated studies on climate and selected climate-related processes of relevance for the assessment of long term repository safety. Based on this information, the report presents a number of possible future climate developments for Forsmark, the site selected for building a repository for spent nuclear fuel in Sweden (Figure 1-1). The presented climate developments are used as basis for the selection and analysis of SR-Site safety assessment scenarios in the SR-Site main report /SKB 2011/. The present report is based on research conducted and published by SKB as well as on research reported in the general scientific literature

  19. Climate and climate-related issues for the safety assessment SR-Site

    International Nuclear Information System (INIS)

    2010-12-01

    The purpose of this report is to document current scientific knowledge on climate and climate-related conditions, relevant to the long-term safety of a KBS-3 repository, to a level required for an adequate treatment in the safety assessment SR-Site. The report also presents a number of dedicated studies on climate and selected climate-related processes of relevance for the assessment of long term repository safety. Based on this information, the report presents a number of possible future climate developments for Forsmark, the site selected for building a repository for spent nuclear fuel in Sweden (Figure 1-1). The presented climate developments are used as basis for the selection and analysis of SR-Site safety assessment scenarios in the SR-Site main report /SKB 2011/. The present report is based on research conducted and published by SKB as well as on research reported in the general scientific literature

  20. Radiation effects issues related to US DOE site remediation and nuclear waste storage

    International Nuclear Information System (INIS)

    Weber, W.J.; Ewing, R.C.

    1994-10-01

    Site restoration activities at DOE facilities and the permanent disposal of nuclear waste generated at the same DOE facilities involve working with and within various types and levels of radiation fields. Radionuclide decay and the associated radiation fields lead to physical and chemical changes that can degrade or enhance material properties. This paper reviews the impact of radiation fields on site restoration activities and on the release rate of radionuclides to the biosphere from nuclear waste forms

  1. Superfund TIO videos: Set B. Financial management and SCAP. Part 8. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape covers various aspects of financial management for the Superfund Program. The importance of effective financial management and execution is discussed. The objectives and definitions of the Superfund Comprehensive Accomplishment Plan (SCAP) and the roles and responsibilities of Superfund personnel in the SCAP process are covered

  2. Superfund TIO videos: Set B. Community relations, communicating with the media and presenting technical information. Part 9. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into three sections. Section 1 discusses the Superfund Community Relations (CR) Program and its history and objectives. Community Relations requirements as defined by CERCLA for Superfund actions are outlined. Community Relations requirements, the nature of community involvement in CR plans, effective CR techniques, and the roles of the OSC, RPM, and EPA Community Relations Coordinator (CRC) are discussed. Section 2 (1) describes the media's perspective on seeking information; (2) identifies five settings and mechanisms for interacting with the media; (3) offers good media-relations techniques; and (4) lists tips for conducting media interviews. Section 3 outlines techniques for presenting technical information, describes how to be prepared to address typical issues of community concern, and identifies the four key elements in handling tough questions

  3. OLEM Center for Program Analysis Site Analysis Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes environmental justice-related analyses of population located within a mile of Superfund and RCRA Corrective Action sites. It characterizes...

  4. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    International Nuclear Information System (INIS)

    Banaee, J.

    2002-01-01

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances

  5. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    Energy Technology Data Exchange (ETDEWEB)

    Banaee, J.

    2002-05-16

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances.

  6. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    Energy Technology Data Exchange (ETDEWEB)

    Banaee, Jila

    2002-08-01

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances.

  7. AMCO Off-Site Air Monitoring Polygons, Oakland CA, 2017, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — This feature class was developed to support the AMCO Chemical Superfund Site air monitoring process and depicts a single polygon layer, Off-Site Air Monitors,...

  8. Issues on a tritium measurement system's qualification on a dismantling site

    Energy Technology Data Exchange (ETDEWEB)

    Pigeon, Benoit; Met, Frederic [Waste Treatment and Nuclear Safety Service - SASN, Waste and Measurement Laboratory - LDM, CEA/SASN/LDM, DAM, DIF, Bruyeres Le Chatel, F-91297 Arpajon (France)

    2015-07-01

    In order to choose the suitable outlet, final disposal of radioactive package requires good knowledge of radiological characteristics of the waste. As part of a nuclear facility's dismantling within tritium proceeds, {sup 3}H contamination is evaluated by using wipe tests which are measured by liquid scintillation. The industrialist's choice is a triple coincidence to double coincidence ratio (TDCR) method with a dry counting protocol. The initial protocol had been defined to reduce the quantity of radioactive liquid waste and to perform an automatic quenching correction. A based on TDCR method liquid scintillation analyser was installed on the decommissioning site. It had had to be used by operator non specialized in metrology, This poster presents the laboratory's feedback on the use of the TDCR method on a site: - problems encountered about protocol on a decommissioning site - protocol adjustments and their consequences. (authors)

  9. CanWEA regional issues and wind energy project siting : mountainous areas

    Energy Technology Data Exchange (ETDEWEB)

    D' Entremont, M. [Jacques Whitford Ltd., Vancouver, BC (Canada)]|[Axys Environmental Consulting Ltd., Vancouver, BC (Canada)

    2008-07-01

    Planning and permitting considerations for wind energy project siting in mountainous areas were discussed. Mountainous regions have a specific set of environmental and socio-economic concerns. Potential disruptions to wildlife, noise, and visual impacts are a primary concern in the assessment of potential wind farm projects. Alpine habitats are unique and often contain fragile and endangered species. Reclamation techniques for mountainous habitats have not been extensively tested, and the sites are not as resilient as sites located in other ecosystems. In addition, alpine habitats are often migratory corridors and breeding grounds for threatened or endangered birds. In the winter months, alpine habitats are used by caribou, grizzly bears, and wolverine dens. Bats are also present at high elevations. It is often difficult to conduct baseline and monitoring studies in mountainous areas since alpine habitat is subject to rapid weather changes, and has a very short construction period. tabs., figs.

  10. SCP Tools user's guide: A knowledge base toolbox for documenting relationships among high-level issues and site studies planned for characterization of a repository site

    International Nuclear Information System (INIS)

    Korns, D.E.; Troy, K.S.

    1988-03-01

    This document describes a personal computer knowledge base system that ranges from issue identification to performance allocation of mined geologic disposal system site characteristics. With SCP Tools, a user can describe a system configuration, identify information needs and parameters and allocate performance of selected system characteristics. SCP Tools allows the user to define information needs for resolution of an issue; parameters required for an information need; measures of performance for parameters, and then link supporting parameters to performance parameters and performance parameters to performance measures. All this is done with computer tools that create non-redundant facts stored in a knowledge base. Unlike most information systems, the SCP Tools remember which facts were already collected, thus allowing greater flexibility and speed in appending facts and reducing the amount of hard disk storage

  11. Demonstrating and Deploying Private Sector Technologies at DOE Sites - Issues to be Overcome

    International Nuclear Information System (INIS)

    Bedick, R. C.

    2002-01-01

    The Department of Energy (DOE), Office of Environmental Management (EM) continues to pursue cost-effective, environmental cleanup of the weapons complex sites with a concomitant emphasis on deployment of innovative technologies as a means to this end. The EM Office of Science and Technology (OST) pursues a strategy that entails identification of technologies that have potential applications throughout the DOE complex: at multiple DOE sites and at multiple facilities on those sites. It further encourages a competitive procurement process for the various applications entailed in the remediation of a given facility. These strategies require a competitive private-sector supplier base to help meet EM needs. OST supports technology development and deployment through investments in partnerships with private industry to enhance the acceptance of their technology products within the DOE market. Since 1992, OST and the National Energy Technology Laboratory (NETL) have supported the re search and development of technology products and services offered by the private sector. During this time, NETL has managed over 140 research and development projects involving industrial and university partners. These projects involve research in a broad range of EM related topics, including deactivation and decommissioning, characterization, monitoring, sensors, waste separation, groundwater remediation, robotics, and mixed waste treatment. Successful partnerships between DOE and Industry have resulted in viable options for EM's cleanup needs, and require continued marketing efforts to ensure that these technology solutions are used at multiple DOE sites and facilities

  12. Issues in the Development of Children's Centres on Nursery and Primary School Sites

    Science.gov (United States)

    Lewis, Jane; Finnegan, Cathy; West, Anne

    2011-01-01

    This paper explores the development of children's centres in England between 2004 and 2008, focusing on the newly created centres that have been located on primary and nursery school sites. Using both an analysis of policy documents and interview data from three urban local authorities, we examine the use of premises and the differing priorities…

  13. Analyzing Patterns of Community Interest at a Legacy Mining Waste Site to Assess and Inform Environmental Health Literacy Efforts

    Science.gov (United States)

    Ramirez-Andreotta, Monica D.; Lothrop, Nathan; Wilkinson, Sarah T.; Root, Robert A.; Artiola, Janick F.; Klimecki, Walter; Loh, Miranda

    2015-01-01

    Understanding a community’s concerns and informational needs is crucial to conducting and improving environmental health research and literacy initiatives. We hypothesized that analysis of community inquiries over time at a legacy mining site would be an effective method for assessing environmental health literacy efforts and determining whether community concerns were thoroughly addressed. Through a qualitative analysis, we determined community concerns at the time of being listed as a Superfund site. We analyzed how community concerns changed from this starting point over the subsequent years, and whether: 1) communication materials produced by the USEPA and other media were aligned with community concerns; and 2) these changes demonstrated a progression of the community’s understanding resulting from community involvement and engaged research efforts. We observed that when the Superfund site was first listed, community members were most concerned with USEPA management, remediation, site-specific issues, health effects, and environmental monitoring efforts related to air/dust and water. Over the next five years, community inquiries shifted significantly to include exposure assessment and reduction methods and issues unrelated to the site, particularly the local public water supply and home water treatment systems. Such documentation of community inquiries over time at contaminated sites is a novel method to assess environmental health literacy efforts and determine whether community concerns were thoroughly addressed. PMID:27595054

  14. Siting of repositories for high level nuclear waste geological and institutional issues

    International Nuclear Information System (INIS)

    Ahagen, H.

    1993-01-01

    Two studies have been conducted in Sweden under contract from SKN-National Board for Spent Nuclear Fuel. The responsibilities of SKN has been transferred to SKI as of July 1, 1992. The first study is related to a compilation of experience and lessons learned from siting of nuclear waste repositories and other controversial facilities in seven countries. The second study is aimed at compiling examples of the state of knowledge related to the regional geological information with relevance to siting of a repository in Sweden. This paper is drawing the general combined conclusions from both these studies. The first study reviewed programs for siting of nuclear and hazardous waste disposal facilities in Canada, Finland, France, Sweden, Switzerland, United Kingdom and USA. The main topics reviewed are related to a/ The use of technical screening, b/ Legal framework and local veto, c/ Public involvement, d/ Interim storage and schedule flexibility, e/ Sequential vs. parallel characterization. The second study focused on the regional geological information available for Sweden and if this information allows for a ''grouping'' of tectonic regions in Sweden with significant differences in history and characteristics. Factors studied as potentially important for siting are bedrock properties, mineralizations, ground water conditions and available volume for a repository. The experience gained from these studies is aimed to be used as background information in the review of the program conducted for the Swedish nuclear utilities by SKB. SKB will according to current plans initiate siting for a repository for spent nuclear fuel in Sweden during 1993. (author). 2 refs

  15. A site specific approach to life cycle managment of labour rights issues

    DEFF Research Database (Denmark)

    Dreyer, Louise Camilla

    not beyond dismissing suppliers and sub-contractors located in high risk environments. Balancing feasibility on one hand and reliability and relevance of results on the other hand is the challenge for a Social LCA method supporting life cycle management. This presentation offers a toolbox for prioritisation...... issues in the product chain through dialogue and partnership. The presented work is based on 5 years of research and practical CSR work in a globally operating Danish Corporation.......It can be observed from companies’ public sustainability commitments and increasing participation in voluntary social responsibility or accountability initiatives like Global Compact and ISO26000 or certification schemes like SA8000 that management of labour rights issues in the product chain...

  16. Information report on nuclear safety and radiation protection of La Hague AREVA site. Issue 2014

    International Nuclear Information System (INIS)

    2013-01-01

    Published in compliance with the French code of the environment, this report first presents the Areva's La Hague site which comprises several basic nuclear installations (INB), is dedicated to several activities related to the nuclear fuel cycle, is submitted to a constraining legal and regulatory framework, and implements a policy for a sustainable development and continuous progress. The document describes the various measures regarding nuclear safety and radiation protection, reports nuclear events which are classified according to the INES scale and occurred and had to be declared in 2014, describes the management of effluents by the different installations present on this site and the control of the environment. It addresses the waste management and the management of other impacts. It gives an overview of actions undertaken regarding information and transparency. Recommendations of the CHSCT are reported

  17. Information report on nuclear safety and radiation protection of La Hague AREVA site. Issue 2013

    International Nuclear Information System (INIS)

    2014-01-01

    Published in compliance with the French code of the environment, this report first presents the Areva's La Hague site which comprises several basic nuclear installations (INB), is dedicated to several activities related to the nuclear fuel cycle, is submitted to a constraining legal and regulatory framework, and implements a policy for a sustainable development and continuous progress. The document describes the various measures regarding nuclear safety and radiation protection, reports nuclear events which are classified according to the INES scale and occurred and had to be declared in 2013, describes the management of effluents by the different installations present on this site and the control of the environment. It addresses the waste management and the management of other impacts. It gives an overview of actions undertaken regarding information and transparency. Recommendations of the CHSCT are reported

  18. Information report on nuclear safety and radiation protection of the La Hague AREVA site- Issue 2012

    International Nuclear Information System (INIS)

    2013-06-01

    Published in compliance with the French code of the environment, this report first presents the Areva's La Hague site which comprises several basis nuclear installations (INB), is dedicated to several activities related to the nuclear fuel cycle, is submitted to a constraining legal and regulatory framework, and implements a policy for a sustainable development and continuous progress. The document describes the various measures regarding nuclear safety and radiation protection, reports nuclear events which are classified according to the INES scale and occurred and had to be declared in 2012, describes the management of effluents by the different installations present on this site and the control of the environment. It addresses the waste management and the management of other impacts. It gives an overview of actions undertaken regarding information and transparency. Recommendations of the CHSCT are reported

  19. Preface Special issue: Monitoring and Seismic Characterization of Archaeological Sites and Structures

    Directory of Open Access Journals (Sweden)

    Paolo Clemente

    2017-07-01

    In this perspective a team composed by researchers of ENEA, INGV and Sapienza University of Rome has recently carried out geophysical and structural investigations on the Amphiteatrum Flavium in Rome, better known as Colosseum, which is the symbol of monumental heritage in Italy and well-known all over the world. The experimental campaign was only a preliminary analysis of the very famous archaeological site that allowed outlining the state of knowledge about the characteristics of the site and the structure and should be considered as a starting point for an in-depth investigation of the monument vulnerability. In our opinion, the benefits of such an integrated approach can steer the political and social choices related with the preservation of the cultural heritage at National or European level.

  20. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  1. Geotechnical investigation for seismic issues for K-reactor area at Savannah River Site

    International Nuclear Information System (INIS)

    Castro, G.; Reeves, C.Q.

    1991-01-01

    A geotechnical investigation has been completed at Savannah River Site to characterize the foundation conditions in K-Reactor Area and confirm soil design properties for use in seismic qualification of structures. The scope of field work included ten soil borings to a 200-foot depth with split-spoon and undisturbed sampling. Additionally, 42 cone penetrometer tests were performed with seismic down-hole measurements. Three cross-hole shear wave velocity tests were also completed to confirm the assumed dynamic properties which had been used in preliminary seismic analysis

  2. Radioactive Waste Management and Environmental Contamination Issues at the Chernobyl Site

    International Nuclear Information System (INIS)

    Napier, Bruce A.; Schmieman, Eric A.; Voitsekhovitch, Oleg V.

    2007-01-01

    The destruction of the Unit 4 reactor at the Chernobyl Nuclear Power Plant resulted in the generation of radioactive contamination and radioactive waste at the site and in the surrounding area (referred to as the Exclusion Zone). In the course of remediation activities, large volumes of radioactive waste were generated and placed in temporary near surface waste-storage and disposal facilities. Trench and landfill type facilities were created from 1986 to 1987 in the Chernobyl Exclusion Zone at distances 0.5 to 15 km from the NPP site. This large number of facilities was established without proper design documentation, engineered barriers, or hydrogeological investigations and they do not meet contemporary waste-safety requirements. Immediately following the accident, a Shelter was constructed over the destroyed reactor; in addition to uncertainties in stability at the time of its construction, structural elements of the Shelter have degraded as a result of corrosion. The main potential hazard of the Shelter is a possible collapse of its top structures and release of radioactive dust into the environment. A New Safe Confinement (NSC) with a 100-years service life is planned to be built as a cover over the existing Shelter as a longer-term solution. The construction of the NSC will enable the dismantlement of the current Shelter, removal of highly radioactive, fuel-containing materials from Unit 4, and eventual decommissioning of the damaged reactor. More radioactive waste will be generated during NSC construction, possible Shelter dismantling, removal of fuel containing materials, and decommissioning of Unit 4. The future development of the Exclusion Zone depends on the future strategy for converting Unit 4 into an ecologically safe system, i.e., the development of the NSC, the dismantlement of the current Shelter, removal of fuel containing material, and eventual decommissioning of the accident site. To date, a broadly accepted strategy for radioactive waste

  3. Radioactive waste management and environmental contamination issues at the Chernobyl site.

    Science.gov (United States)

    Napier, B A; Schmieman, E A; Voitsekovitch, O

    2007-11-01

    The destruction of the Unit 4 reactor at the Chernobyl Nuclear Power Plant resulted in the generation of radioactive contamination and radioactive waste at the site and in the surrounding area (referred to as the Exclusion Zone). In the course of remediation activities, large volumes of radioactive waste were generated and placed in temporary near-surface waste storage and disposal facilities. Trench and landfill type facilities were created from 1986-1987 in the Chernobyl Exclusion Zone at distances 0.5-15 km from the nuclear power plant site. This large number of facilities was established without proper design documentation, engineered barriers, or hydrogeological investigations and they do not meet contemporary waste-safety requirements. Immediately following the accident, a Shelter was constructed over the destroyed reactor; in addition to uncertainties in stability at the time of its construction, structural elements of the Shelter have degraded as a result of corrosion. The main potential hazard of the Shelter is a possible collapse of its top structures and release of radioactive dust into the environment. A New Safe Confinement (NSC) with a 100 y service life is planned to be built as a cover over the existing Shelter as a longer-term solution. The construction of the NSC will enable the dismantlement of the current Shelter, removal of highly radioactive, fuel-containing materials from Unit 4, and eventual decommissioning of the damaged reactor. More radioactive waste will be generated during NSC construction, possible Shelter dismantling, removal of fuel-containing materials, and decommissioning of Unit 4. The future development of the Exclusion Zone depends on the future strategy for converting Unit 4 into an ecologically safe system, i.e., the development of the NSC, the dismantlement of the current Shelter, removal of fuel-containing material, and eventual decommissioning of the accident site. To date, a broadly accepted strategy for radioactive waste

  4. Information report on nuclear safety and radiation protection of the Romans site - Issue 2014

    International Nuclear Information System (INIS)

    2015-06-01

    In compliance with the French Code of the Environment, this annual document describes the arrangements regarding nuclear safety and radiation protection, reports incidents and accidents of nuclear safety and radiation protection which must be declared according to this Code and which occurred within the installation, as well as the actions undertaken to limit their development and the consequences for people health for the environment, describes the nature and results of measurements of radioactive and not radioactive releases by the installation in the environment, describes the nature and quantities of radioactive wastes which are warehoused on the installation site as well as measures to limit their volume and their impact on health and on the environment, notably in soils and waters. After a presentation of the AREVA plant located in Romans-sur-Isere which comprises two basic nuclear installations (INB) and where fuel assemblies are manufactured, the different parts of this report address the measures regarding nuclear safety and radiation protection, nuclear events according to the INES scale, the management of releases by the different installations of this site and the control of the environment, the management of radioactive wastes, and the actions undertaken regarding information and transparency. Recommendations of the CHSCT are also reported

  5. Information report on nuclear safety and radiation protection of the Romans site - Issue 2012

    International Nuclear Information System (INIS)

    2013-06-01

    In compliance with the French Code of the Environment, this annual document describes the arrangements regarding nuclear safety and radiation protection, reports incidents and accidents of nuclear safety and radiation protection which must be declared according to this Code and which occurred within the installation, as well as the actions undertaken to limit their development and the consequences for people health for the environment, describes the nature and results of measurements of radioactive and not radioactive releases by the installation in the environment, describes the nature and quantities of radioactive wastes which are warehoused on the installation site as well as measures to limit their volume and their impact on health and on the environment, notably in soils and waters. After a presentation of the AREVA plant located in Romans-sur-Isere which comprises two basic nuclear installations (INB) and where fuel assemblies are manufactured, the different parts of this report address the measures regarding nuclear safety and radiation protection, nuclear events according to the INES scale, the management of releases by the different installations of this site and the control of the environment, the management of radioactive wastes, and the actions undertaken regarding information and transparency. Recommendations of the CHSCT are also reported

  6. Information report on nuclear safety and radiation protection of the Romans site - Issue 2013

    International Nuclear Information System (INIS)

    2014-06-01

    In compliance with the French Code of the Environment, this annual document describes the arrangements regarding nuclear safety and radiation protection, reports incidents and accidents of nuclear safety and radiation protection which must be declared according to this Code and which occurred within the installation, as well as the actions undertaken to limit their development and the consequences for people health for the environment, describes the nature and results of measurements of radioactive and not radioactive releases by the installation in the environment, describes the nature and quantities of radioactive wastes which are warehoused on the installation site as well as measures to limit their volume and their impact on health and on the environment, notably in soils and waters. After a presentation of the AREVA plant located in Romans-sur-Isere which comprises two basic nuclear installations (INB) and where fuel assemblies are manufactured, the different parts of this report address the measures regarding nuclear safety and radiation protection, nuclear events according to the INES scale, the management of releases by the different installations of this site and the control of the environment, the management of radioactive wastes, and the actions undertaken regarding information and transparency. Recommendations of the CHSCT are also reported

  7. Safety issues in construction of facilities for long-term storage of radioactive waste at vector site

    Energy Technology Data Exchange (ETDEWEB)

    Tokarevskyi, O.; Alekseeva, Z.; Kondratiev, S. [State Scientific and Technical Center for Nuclear and Radiation Safety, Kyiv (Ukraine); Rybalka, N. [State Nuclear Regulatory Inspectorate of Ukraine, Kyiv (Ukraine)

    2013-07-01

    In Ukraine, it is planned to create a number of near-surface facilities for disposal of short-lived RW and long-term (up to 100 years) storage of long-lived RW at the Vector site in the Chernobyl exclusion zone. The expected streams of long-lived RW are analyzed in the paper. According to the analysis of RW streams, in particular, issues are considered on development of RW acceptance criteria, admissible radiological impacts during preparation of RW for long-term storage, reliability of barriers (RW packages, modules and structures, etc.) during long-term storage of RW. (orig.)

  8. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  9. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  10. Hanford Site organic waste tanks: History, waste properties, and scientific issues

    International Nuclear Information System (INIS)

    Strachan, D.M.; Schulz, W.W.; Reynolds, D.A.

    1993-01-01

    Eight Hanford single-shell waste tanks are included on a safety watch list because they are thought to contain significant concentrations of various organic chemical. Potential dangers associated with the waste in these tanks include exothermic reaction, combustion, and release of hazardous vapors. In all eight tanks the measured waste temperatures are in the range 16 to 46 degree C, far below the 250 to 380 degree C temperatures necessary for onset of rapid exothermic reactions and initiation of deflagration. Investigation of the possibility of vapor release from Tank C-103 has been elevated to a top safety priority. There is a need to obtain an adequate number of truly representative vapor samples and for highly sensitive and capable methods and instruments to analyze these samples. Remaining scientific issues include: an understanding of the behavior and reaction of organic compounds in existing underground tank environments knowledge of the types and amounts of organic compounds in the tanks knowledge of selected physical and chemical properties of organic compounds source, composition, quality, and properties of the presently unidentified volatile organic compound(s) apparently evolving from Tank C-103

  11. Radioactive waste isolation in salt: Peer review of the Office of Nuclear Waste Isolation's draft report on an issues hierarchy and data needs for site characterization

    International Nuclear Information System (INIS)

    Harrison, W.; Fenster, D.F.; Ditmars, J.D.; Paddock, R.A.; Rote, D.M.; Hambley, D.F.; Seitz, M.G.; Hull, A.B.

    1986-12-01

    At the request of the Salt Repository Project (SRPO), Argonne National Laboratory conducted an independent peer review of a report by the Battelle Office of Nuclear Waste Isolation entitled ''Salt Repository Project Issues Hierarchy and Data Needs for Site Characterization (Draft).'' This report provided a logical structure for evaluating the outstanding questions (issues) related to selection and licensing of a site as a high-level waste repository. It also provided a first estimate of the information and data necessary to answer or resolve those questions. As such, this report is the first step in developing a strategy for site characterization. Microfiche copies of ''Draft Issues Hierarchy, Resolution Strategy, and Information Needs for Site Characterization and Environmental/Socioeconomic Evaluation - July, 1986'' and ''Issues Hierarchy and Data Needs for Site Characterization - February, 1985'' are included in the back pocket of this report

  12. 'Mini'-Roadmapping - Ensuring Timely Sites' Cleanup/Closure by Resolving Science and Technology Issues

    International Nuclear Information System (INIS)

    Luke, D.E.; Dixon, B.W.; Murphy, J.A.

    2003-01-01

    Roadmapping is a powerful tool to manage technical risks and opportunities associated with complex problems. Roadmapping identifies technical capabilities required for both project- and program-level efforts and provides the basis for plans that ensure the necessary enabling activities will be done when needed. Roadmapping reveals where to focus further development of the path forward by evaluating uncertainties for levels of complexity, impacts, and/or the potential for large payback. Roadmaps can be customized to the application, a ''graded approach'' if you will. Some roadmaps are less detailed. We have called these less detailed, top-level roadmaps ''mini-roadmaps''. These mini roadmaps are created to tie the needed enablers (e.g., technologies, decisions, etc.) to the functions. If it is found during the mini-roadmapping that areas of significant risk exist, then those can be roadmapped further to a lower level of detail. Otherwise, the mini-roadmap may be sufficient to manage the project/program risk. Applying a graded approach to the roadmapping can help keep the costs down. Experience has indicated that it is best to do mini-roadmapping first and then evaluate the risky areas to determine whether to further evaluate those areas. Roadmapping can be especially useful for programs/projects that have participants from multiple sites, programs, or other entities which are involved. Increased synergy, better communications, and increased cooperation are the results from roadmapping a program/project with these conditions

  13. Information report on nuclear safety and radiation protection of the SOMANU site - Issue 2014

    International Nuclear Information System (INIS)

    2015-01-01

    Published in compliance with the French code of the environment, this report first presents different aspects of the SOMANU plant which is dedicated to the maintenance of materials and equipment from nuclear installations: location and environment, history, description of activities, regulatory framework. It describes the various measures regarding nuclear safety and radiation protection: general principles of nuclear safety, organization, presentation of the Areva's nuclear safety Charter, inspections and controls, measures regarding radiation protection. The next part addresses nuclear events which occurred on this site and had to be declared. The report gives an overview of activities and measures regarding the management of releases and the control of the environment. The next part addresses waste management: general considerations on radioactive waste management in France, description and classification of radioactive wastes present in the INB, management of conventional wastes. The management of other impacts is also reported. The last chapter reviews the actions undertaken in the field of transparency and information. Recommendations of the CHSCT are reported

  14. A green roof experimental site in the Mediterranean climate: the storm water quality issue.

    Science.gov (United States)

    Gnecco, Ilaria; Palla, Anna; Lanza, Luca G; La Barbera, Paolo

    2013-01-01

    Since 2007, the University of Genoa has been carrying out a monitoring programme to investigate the hydrologic response of green roofs in the Mediterranean climate by installing a green roof experimental site. In order to assess the influence of green roofs on the storm water runoff quality, water chemistry data have been included in the monitoring programme since 2010, providing rainfall and outflow data. For atmospheric source, the bulk deposition is collected to evaluate the role of the overall atmospheric deposition in storm water runoff quality. For subsurface outflow, a maximum of 24 composite samples are taken on an event basis, thus aiming at a full characterization of the outflow hydrograph. Water chemistry data reveal that the pollutant loads associated with green roof outflow is low; in particular, solids and metal concentrations are lower than values generally observed in storm water runoff from traditional rooftops. The concentration values of chemical oxygen demand, total dissolved solids, Fe, Ca and K measured in the subsurface outflow are significantly higher than those observed in the bulk deposition (p green roof behaviour as a sink/source of pollutants is investigated based on both concentration and mass.

  15. Information report on nuclear safety and radiation protection of the SOMANU site - Issue 2012

    International Nuclear Information System (INIS)

    2013-06-01

    Published in compliance with the French code of the environment, this report first presents different aspects of the SOMANU plant which is dedicated to the maintenance of materials and equipment from nuclear installations: location and environment, history, description of activities, regulatory framework. It describes the various measures regarding nuclear safety and radiation protection: general principles of nuclear safety, organization, presentation of the Areva's nuclear safety Charter, inspections and controls, measures regarding radiation protection. The next part addresses nuclear events which occurred on this site and had to be declared. The report gives an overview of activities and measures regarding the management of releases and the control of the environment. The next part addresses waste management: generalities on radioactive waste management in France, description and classification of radioactive wastes present in the INB, management of conventional wastes. The management of other impacts is also reported. The last chapter reviews the actions undertaken in the field of transparency and information. Recommendations of the CHSCT are reported

  16. Issues on safe radioactive waste management at ChNPP site in International Shelter Implementation Plan

    International Nuclear Information System (INIS)

    Bykov, V.; Kilochytska, T.; Gromyko, S.; Kadkin, Y.; Kondratiev, S.; Pavlenko, A.; Bogorinski, P.

    2003-01-01

    The International Shelter Implementation Plan (SIP) [1], is aimed to convert the ChNPP unit 4, destroyed by a beyond-design accident in 1986, into an environmentally safe facility by means of large-scale projects such as stabilization of the existing Sarcophagus (Shelter), construction of a New Safe Confinement (NSC), and installation of engineering and monitoring systems. This report presents some important safety issues concerning radioactive waste (RAW) management at the Shelter. One of the main problems of RAW management is to dispose of large volumes of RAW generated during ground preparation work. It is necessary that RAW be sorted carefully to separate low-active radioactive waste (LLW), which will be the majority, from high-level waste. Considering the fact that the Shelter is in the exclusion zone, the interim storage of LLW in this zone is possible, but a set of safety measures is required, e.g. prevention of dust generation or spreading of radioactivity with water. Another problem is high level RAW management. Highly radioactive fragments of the core, including fuel were ejected during the accident and are now buried under the man-made layer around the Shelter. Unanticipated disclosure of such fragments may happen during any ground preparation work as well as during clearing of premises inside the damaged buildings. Therefore, permanent radiation monitoring is required to prevent any intolerable exposure of workers. Unanticipated disclosure of high-active radioactive waste (HLW) could lead to considerable delay of any work. Since it is particularly difficult to remove HLW from those locations, which can not be easily accessed with removal equipment, such waste needs to be confined and properly shielded at in situ. Due to absence of a permanent HLW storage, an interim storage needs to be provided for in the territory of the Sarcophagus. (author)

  17. Regulatory Issues and Challenges in Preparing for the Regulation of New Reactor Siting: Malaysia's Experience

    International Nuclear Information System (INIS)

    Jais, Azlina Mohammad; Hassan, Halimah; Yasir, Muhamad Samudi; Roslan, Ridha

    2011-01-01

    This paper aims at giving an overview about the issues and challenges facing regulatory authority, the Atomic Energy Licensing Board (AELB) in ensuring nuclear safety, security and safeguards (3S's) and other relevant authorities to meet an impending nuclear power programme post-2020, in particular at the beginning stage of preparation for the regulation of nuclear power reactor siting. A comparison with an international framework and guidelines of the International Atomic Energy Agency (IAEA) and other countries' practice was made to get an overview of the present adequacy of Malaysia's nuclear regulatory framework in preparation for Malaysia to consider and perhaps decide for a safe, secure and peaceful nuclear power project in Malaysia, in utilising nuclear power in a quest for energy diversity and security. The important stage in the development of a nuclear power project is the evaluation of a suitable site to establish the site-related design inputs for the NPP. The evaluation of suitable site is the result of a process to ensure adequate protection of workers, public and the environment from the undue risk of ionizing radiation arising from NPP taking into account impact to the social communities and public acceptance, thus it will depend on the regulators to ensure a high level safety standards and security are met, in addition to its peaceful uses. Development of regulatory criteria for the site evaluation is a pre-initiatives licensing work for a possible nuclear power plant to performing effective nuclear safety and security reviews in an efficient and timely manner regardless whether Malaysia embarks on a nuclear power programme with anticipating challenges, learning from others' experiences in preparing for the demands for new licensing processes by collaborating internationally, in an expanding global environment

  18. Experiences from two local processes of debate and referenda on the issue of siting high level nuclear waste

    International Nuclear Information System (INIS)

    Drottz Sjoberg, B.M.

    1998-01-01

    Full text of publication follows: the paper summarizes results from two interview studies conducted in the communities of Storuman (1995) and Malaa (1997) in northern Sweden regarding whether to continue investigations of the areas for siting of a deep level repository for high level nuclear waste. Active, local participants in the work and discussions preceding each local referendum on the issue were asked to reflect on reasons and considerations related to their opinions, as well as the overall outcome for achieving a deeper understanding of the local processes. The first referendum (1995) yielded a strongly voiced rejection of continuing local investigations (72%), whereas the second (1997) referendum resulted in a marginally negative response (54%). A comparison of the results of the interview studies showed e.g. that the decision processes differed across communities, regarding both time interval and content, and that the local strategies and tactics related to the campaigns preceding the referenda differed. Among the similarities were the types of questions which remained unclear, often related to a long term perspective, e.g. risks and uncertainties regarding material reliability, access to and future safety of the repository, concern for future generations, national and international long-term decision procedures, and roles of responsibility. The discussion focuses on considerations around the issue of local vs. centralized political decisions and the tool provided by the referendum, and touches upon some issues which appeared rather paradoxical. (author)

  19. 'Mini'-Roadmapping - Ensuring Timely Sites' Cleanup/Closure by Resolving Science and Technology Issues

    International Nuclear Information System (INIS)

    Dale Luke; James Murphy

    2003-01-01

    Roadmapping is a powerful tool to manage technical risks and opportunities associated with complex problems. Roadmapping identifies technical capabilities required for both project- and program-level efforts and provides the basis for plans that ensure the necessary enabling activities will be done when needed. Roadmapping reveals where to focus further development of the path forward by evaluating uncertainties for levels of complexity, impacts, and/or the potential for large payback. Roadmaps can be customized to the application, a ''graded approach'' if you will. Some roadmaps are less detailed. We have called these less detailed, top-level roadmaps ''mini-roadmaps''. These miniroadmaps are created to tie the needed enablers (e.g., technologies, decisions, etc.) to the functions. If it is found during the mini-roadmapping that areas of significant risk exist, then those can be road mapped further to a lower level of detail. Otherwise, the mini-roadmap may be sufficient to manage the project/program risk. Applying a graded approach to the roadmapping can help keep the costs down. Experience has indicated that it is best to do mini-roadmapping first and then evaluate the risky areas to determine whether to further evaluate those areas. Roadmapping can be especially useful for programs/projects that have participants from multiple sites, programs, or other entities which are involved. Increased synergy, better communications, and increased cooperation are the results from roadmapping a program/project with these conditions. And, as with any trip, the earlier you use a roadmap, the more confidence you will have that you will arrive at your destination with few, if any, problems. The longer the trip or complicated the route, the sooner the map is needed. This analogy holds true for using roadmapping for laying out program/project baselines and any alternative (contingency) plans. The mini-roadmapping process has been applied to past projects like the hydrogen gas

  20. SITE - EMERGING TECHNOLOGIES: LASER INDUCED PHOTO- CHEMICAL OXIDATIVE DESTRUCTION OF TOXIC ORGANICS IN LEACHATES AND GROUNDWATERS

    Science.gov (United States)

    The technology described in this report has been developed under the Emerging Technology Program of the Superfund Innovative Technology Evaluation (SITE) Program to photochemically oxidize organic compounds in wastewater by applying ultraviolet radiation using an excimer laser. T...

  1. 40 CFR 300.220 - Related Title III issues.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Related Title III issues. 300.220 Section 300.220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... PLAN Planning and Preparedness § 300.220 Related Title III issues. Other related Title III requirements...

  2. Superfund explanation of significant difference for the record of decision (EPA Region 8): Lowry Landfill, Aurora, CO, October 24, 1997

    International Nuclear Information System (INIS)

    1999-03-01

    Please be advised that there is an error within Attachment E (Technical Evaluation of Proposed Ground-Water Treatment and Disposal Alternatives) of the ''Responsiveness Summary for the Second Explanation of Significant Differences, Lowry Landfill Superfund Site'' document. The evaluation table, which summarizes the rankings of the two cleanup alternatives, failed to include numerical values for State Acceptance and Community Acceptance. Enclosed is a copy of the table as it should have appeared in Attachment E. Copies of this errata sheet are being mailed to all recipients of the Responsiveness Summary

  3. Site-specific evaluation of safety issues for high-level waste disposal in crystalline rocks. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Jobmann, M. (ed.) [DBE Technology GmbH, Peine (Germany)

    2016-03-31

    intent to assist Russian engineers and scientists in their integration into the international scientific community concerned with radioactive waste disposal and to share advanced safety approaches. The corresponding joint R and D activities were pooled in the following three R and D BMWi-funded projects: - ASTER ''Requirements for Site Investigation for a HLW Repository in hard rock Formations'' (2002 - 05), to develop a well-justified methodological approach for site investigation and selection in the Nizhnekansk granitoid formation near Krasnoyarsk, exemplarily for the disposal of conditioned HLW sludge from formerly produced weapons-grade plutonium and vitrified HLW from reprocessing - WIBASTA ''Performance investigation of engineered and geologic barriers of a HLW repository in magmatic host rocks'' (2005 - 08): performance analysis of the system of geologic and engineered barriers based on safety functions, exemplarily for the proposed HLW disposal facility at the Yeniseysky site - URSEL ''Site-specific evaluation of safety issues for HLW disposal in crystalline rocks'' (2008 - 16) Main Objective: Investigation of the robustness of the safety and of the safety assessment of e repository in crystalline rocks. In the last decade of the 20th century, site investigation activities started in various preselected regions of the Nizhnekansky granitoid formation east of Krasnoyarsk. Starting in 2003, preference was given to the Yeniseysky site, which is located several kilometres south east of the underground former production facilities for weapons-grade plutonium of the Mining Chemical Combine (MCC) at Zheleznogorsk. In the beginning, these investigations were performed for the eventual disposal of conditioned HLW sludge from weapons-grade plutonium production and vitrified HLW from reprocessing of the planned reprocessing plant RT-2 at Zheleznogorsk. Recently, priority has been given to so-called class 1 waste

  4. Superfund Hazard Ranking System Training Course

    Science.gov (United States)

    The Hazard Ranking System (HRS) training course is a four and ½ day, intermediate-level course designed for personnel who are required to compile, draft, and review preliminary assessments (PAs), site inspections (SIs), and HRS documentation records/packag

  5. Superfund/IGD: EF_NPL

    Data.gov (United States)

    U.S. Environmental Protection Agency — EF_NPL is a subset of facilities from FRS_INTEREST and FRS_FACILITY_SITE which are updated on a monthly basis as part of the Locational Reference Tables (LRT)...

  6. AMCO On-Site Trichloroethene (TCE) Air Monitoring Points, Oakland CA, Live 2017, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — This feature class contains points depicting locations and air monitor sensor readings for Trichloroethene (TCE) and supports the AMCO Chemical Superfund Site air...

  7. Superfund risk assessment in soil contamination studies

    International Nuclear Information System (INIS)

    Hoddinott, K.B.

    1992-01-01

    This symposium was held in New Orleans, Louisiana on January 30-31, 1991. The purpose of the meeting was to provide a forum for exchange of information on risk assessment associated with soil contamination. The conference included presentations in the following categories: site characterization; fate and transport; toxicity, exposures, and receptors; risk characterization/case studies; and establishing cleanup levels. Individual papers have been cataloged separately for inclusion in the appropriate data bases

  8. SUPERFUND TREATABILITY CLEARINGHOUSE: WORK PLAN FOR BIODEGRADATION OF POLY-CHLORINATED BIPHENYLS (PCBS) AT A SUPERFUND SITE

    Science.gov (United States)

    This document is composed of a work plan and additional technical information which demonstrates the qualifications of Detox Industries, Inc. to conduct remediation of a PCB contaminated sludge at General Motors (GM) plant in New York. Provided are the results of a field demons...

  9. Evaluation of hearings. Results from reviews of the nuclear waste issue in the Swedish site candidate municipalities

    International Nuclear Information System (INIS)

    Drottz-Sjoeberg, B.M.

    2001-10-01

    building a future high level nuclear waste repository. The recently published report by SKB (FUD-K) contributed the main foundation for the program content, which was structured into the two parts of (a) the choice of methodology and (b) the choice of municipalities for the forthcoming site investigations. This report is based on the content of the actual hearings, e.g. questions, answers and comments from the proceedings and group discussions, as well as responses to three questionnaires. The report states that the majority of the participants at the hearings were those already involved, in one way or another, in the municipalities organized work related to the nuclear waste issue. Thus, the hearings did not attract a large number of novices or uninitiated individuals from the general public. The wide scope of considered aspects and the high level of knowledge among the participants were reflected by the questions put to the panel. The questionnaire responses also indicated high initial involvement in the hearings, and that the participants came well prepared to the meetings. The main preparation being studies of available reports and other materials, but also e.g. participation in information seminars or in meetings organized by the municipalities. Their reasons for participation often involved a desire to learn more in relation to specifically formulated questions and / or to gain a better understanding of the work and the overall process. The participants wanted to achieve a result that outlined pros and cons of various methodologies regarding waste management, and which stated the degree of reliability regarding the proposed technological solutions. Furthermore, to reach a substantial level of clarity regarding what can be considered as established facts in contrast to what remains uncertain or problematic. The results indicated that a majority of the participants preferred the proposed KBS-3 method to other alternatives with respect to the construction of a final

  10. Information report on nuclear safety and radiation protection of the Tricastin AREVA site - Issue 2013. Figures and information about nuclear safety and radiation protection of the Tricastin AREVA site - Issue 2013

    International Nuclear Information System (INIS)

    2014-06-01

    Published in compliance with the French code of the environment, this report first presents different aspects of the Areva's Tricastin site which comprises five basic nuclear installations or INBs, and seven ICPE (installation classified for the protection of the environment). The activities are dedicated to uranium conversion, uranium enrichment, uranium chemistry, industrial services, and fuel manufacturing. The report presents this important industrial site, describes the various measures regarding nuclear safety and radiation protection, reports nuclear events which occurred on this site and had to be declared, reports the management of releases by this site and the control of the environment. The next part addresses the management of the various wastes produced by the different installations present on this site. The management of other impacts is also reported. The last chapter reviews the actions undertaken in the field of transparency and information

  11. Information report on nuclear safety and radiation protection of the Tricastin AREVA site - Issue 2014. Figures and information about nuclear safety and radiation protection of the Tricastin AREVA site - Issue 2014

    International Nuclear Information System (INIS)

    2015-06-01

    Published in compliance with the French code of the environment, this report first presents different aspects of the Areva's Tricastin site which comprises five basic nuclear installations or INBs, and seven ICPE (installation classified for environment protection). The activities are dedicated to uranium conversion, uranium enrichment, uranium chemistry, industrial services, and fuel manufacturing. The report presents this important industrial site, describes the various measures regarding nuclear safety and radiation protection, reports nuclear events which occurred on this site and had to be declared, reports the management of releases by this site and the control of the environment. The next part addresses the management of the various wastes produced by the different installations present on this site. The management of other impacts is also reported. The last chapter reviews the actions undertaken in the field of transparency and information

  12. 48 CFR 22.404-4 - Solicitations issued without wage determinations for the primary site of the work.

    Science.gov (United States)

    2010-10-01

    ... Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS... issued as an amendment to the solicitation. (b) In sealed bidding, bids may not be opened until a...

  13. Ensuring the adequacy of cost share provisions in superfund state contracts. Directive

    International Nuclear Information System (INIS)

    1993-01-01

    The memorandum requests regional offices to re-examine existing Superfund State Contracts (SSCs) for Fund-financed remedial actions to verify that they adequately reflect incurred and projected remedial action costs

  14. 75 FR 38100 - National Institute of Environmental Health Sciences Superfund Hazardous Substance Research and...

    Science.gov (United States)

    2010-07-01

    ...- traditional communication methods to make the significance and applicability of SRP-funded research... and Social Sciences Research, and National Institute of Biomedical Imaging and Bioengineering. [cir... Superfund Hazardous Substance Research and Training Program Strategic Plan; Request for Comments ACTION...

  15. Assessment of economic factors affecting the satellite power system. Volume 2: The systems implications of rectenna siting issues

    Science.gov (United States)

    Chapman, P. K.; Bugos, B. J.; Csigi, K. I.; Glaser, P. E.; Schimke, G. R.; Thomas, R. G.

    1979-01-01

    The feasibility was evaluated of finding potential sites for Solar Power Satellite (SPS) receiving antennas (rectennas) in the continental United States, in sufficient numbers to permit the SPS to make a major contribution to U.S. generating facilities, and to give statistical validity to an assessment of the characteristics of such sites and their implications for the design of the SPS system. It is found that the cost-optimum power output of the SPS does not depend on the particular value assigned to the cost per unit area of a rectenna and its site, as long as it is independent of rectenna area. Many characteristics of the sites chosen affect the optimum design of the rectenna itself.

  16. Abstracts of 3. International scientific-practical conference 'Semipalatinsk Test Site. Radiation Legacy and Non-proliferation Issues'

    International Nuclear Information System (INIS)

    2008-01-01

    The Conference gathered representatives of more than 25 countries and international organizations. In the Conference among with actual problems of current environment conditions in Kazakhstan, perspective trends in the field of radiation protection, radio-ecological and radiobiological research and issues of international co-operation in support of non-proliferation regime, other advanced scientific projects were considered [ru

  17. Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act Section 120(e)(5)

    International Nuclear Information System (INIS)

    1992-05-01

    The US Department of Energy (DOE) is committed to conducting its operations. In a safe and environmentally sound manner. High priorities for the Department are identifying and correcting environmental problems at DOE facilities that resulted from past operations, and preventing environmental problems from occurring during present and future operations. In this regard, the Department is committed to the 30-year goal of cleanup of all facilities by the year 2019. DOE has issued an Order and guidance establishing policy and procedures for activities conducted under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA), and has developed a Five-Year Plan, updated annually, that integrates planing for corrective activities, environmental restoration, and waste management operations at its facilities. During Calendar Year 1991 and early 1992, DOE made significant progress in reaching agreements with regulatory entities, undertaking cleanup actions, and initiating preventive measures designed to eliminate future environmental problems. These accomplishments are described

  18. Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

    International Nuclear Information System (INIS)

    Walker, Stuart

    2008-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions

  19. Addressing host community issues through enhancing community well-being: a practical framework for siting major nuclear projects in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Stemeroff, M.; Richardson, D.; Wlodarczyk, T.L. [AECOM Canada Limited, Markham, ON (Canada)

    2011-07-01

    Canada. Despite the wide use of different terminology, all relate to a similar set of goals, largely being the improvement of community and/or individual quality-of-life or state of well-being over the long-term. There is an old adage that says 'you get what you measure'. In this case, simply defining community well-being, no matter the nature or scope of it, is not enough to make it happen. For many, the process of measuring community well-being provides a concrete focus to engage local citizens and to strengthen communities through discussions about what matters most to them. The process of defining community well-being and developing community well-being indicators and community plans is seen by many as an excellent way to inform and involve local people and organizations, and it is a meaningful undertaking for local citizens. It enables them to identify their key issues, discuss their priorities and contribute to possible actions and plans for their community that they feel they have developed for themselves. Involving citizens in the process is more likely to lead to change (hopefully increase) in community well-being. It will be shown that local community stakeholders 'buy-in' to or adopt changes more readily when they are a part of the 'well-being assessment' process from the beginning and are involved in assessing how it directly applies to them. What this means for the nuclear industry in siting and implementing its projects and activities, (from uranium mining, milling and processing, power generation and transmission, to decommissioning and waste management), will be discussed. The end game is earning social acceptance by leveraging publically accessible and open communication medium (which we refer to as 'Open Source' approaches,), such as Facebook, Twitter, etc. In some sense this is the new reality of project approvals -- which we refer to later as Project Approvals 2.0. Using a community well-being framework is a

  20. Addressing host community issues through enhancing community well-being: a practical framework for siting major nuclear projects in Canada

    International Nuclear Information System (INIS)

    Stemeroff, M.; Richardson, D.; Wlodarczyk, T.L.

    2011-01-01

    Canada. Despite the wide use of different terminology, all relate to a similar set of goals, largely being the improvement of community and/or individual quality-of-life or state of well-being over the long-term. There is an old adage that says 'you get what you measure'. In this case, simply defining community well-being, no matter the nature or scope of it, is not enough to make it happen. For many, the process of measuring community well-being provides a concrete focus to engage local citizens and to strengthen communities through discussions about what matters most to them. The process of defining community well-being and developing community well-being indicators and community plans is seen by many as an excellent way to inform and involve local people and organizations, and it is a meaningful undertaking for local citizens. It enables them to identify their key issues, discuss their priorities and contribute to possible actions and plans for their community that they feel they have developed for themselves. Involving citizens in the process is more likely to lead to change (hopefully increase) in community well-being. It will be shown that local community stakeholders 'buy-in' to or adopt changes more readily when they are a part of the 'well-being assessment' process from the beginning and are involved in assessing how it directly applies to them. What this means for the nuclear industry in siting and implementing its projects and activities, (from uranium mining, milling and processing, power generation and transmission, to decommissioning and waste management), will be discussed. The end game is earning social acceptance by leveraging publically accessible and open communication medium (which we refer to as 'Open Source' approaches,), such as Facebook, Twitter, etc. In some sense this is the new reality of project approvals -- which we refer to later as Project Approvals 2.0. Using a community well-being framework is a

  1. Addressing host community issues through enhancing community well-being: a practical framework for siting major nuclear projects in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Stemeroff, M.; Richardson, D.; Wlodarczyk, T. L. [AECOM Canada Limited, Markham, ON (Canada)

    2011-07-01

    use of different terminology, all relate to a similar set of goals, largely being the improvement of community and/or individual quality-of-life or state of well-being over the long-term. There is an old adage that says 'you get what you measure'. In this case, simply defining community well-being, no matter the nature or scope of it, is not enough to make it happen. For many, the process of measuring community well-being provides a concrete focus to engage local citizens and to strengthen communities through discussions about what matters most to them. The process of defining community well-being and developing community well-being indicators and community plans is seen by many as an excellent way to inform and involve local people and organizations, and it is a meaningful undertaking for local citizens. It enables them to identify their key issues, discuss their priorities and contribute to possible actions and plans for their community that they feel they have developed for themselves. Involving citizens in the process is more likely to lead to change (hopefully increase) in community well-being. It will be shown that local community stakeholders 'buy-in' to or adopt changes more readily when they are a part of the 'well-being assessment' process from the beginning and are involved in assessing how it directly applies to them. What this means for the nuclear industry in siting and implementing its projects and activities, (from uranium mining, milling and processing, power generation and transmission, to decommissioning and waste management), will be discussed. The end game is earning social acceptance by leveraging publically accessible and open communication medium (which we refer to as 'Open Source' approaches,), such as Facebook, Twitter, etc. In some sense this is the new reality of project approvals -- which we refer to later as Project Approvals 2.0. Using a community well-being framework is a tactic that when applied in right measure and context, can be

  2. Potential CERCLA reauthorization issues relevant to US DOE's Environmental Restoration Program

    International Nuclear Information System (INIS)

    Siegel, M.R.; McKinney, M.D.; Jaksch, J.A.; Dailey, R.L.

    1993-02-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is currently scheduled to be reauthorized in 1994. The US Department of Energy (DOE) has a significant stake in CERCLA reauthorization. CERCLA, along with its implementing regulation, the National Contingency Plan (NCP), is the principal legal authority governing DOE's environmental restoration program. The manner in which CERCLA-related issues are identified, evaluated, and dispatched may have a substantial impact on DOE's ability to conduct its environmental restoration program. A number of issues that impact DOE's environmental restoration program could be addressed through CERCLA reauthorization. These issues include the need to (1) address how the National Environmental Policy Act (NEPA) should be integrated into DOE CERCLA actions, (2) facilitate the streamlining of the Superfund process at DOE sites, (3) address the conflicts between the requirements of CERCLA and the Resource Conservation and Recovery Act (RCRA) that are especially relevant to DOE, (4) examine the criteria for waiving applicable or relevant and appropriate requirements (ARARs) at DOE sites, and (5) delineate the appropriate use of institutional controls at DOE sites

  3. Occupational health and safety issues in the informal economic segment of Pakistan: a survey of construction sites.

    Science.gov (United States)

    Ahmed, Ishfaq; Shaukat, Muhammad Zeeshan; Usman, Ahmad; Nawaz, Muhammad Musarrat; Nazir, Mian Sajid

    2018-06-01

    This research covers the current status of occupational health and safety (OHS)-related practices in the informal construction segment of Pakistan. Data were collected, through interviews, from 316 construction sites employing 3577 workers. The results of the study reveal that both employers and workers lack knowledge of OHS laws/standards and no practices of this nature are enacted at these construction sites. Alarmingly, work-related accidents, whenever they happen, are not given due attention and there is no formal injury-report system. The informal construction industry employs a huge portion of the informal workforce, and lack of OHS happens at tremendous human cost. These research findings may thus play their role in strengthening the case for reforms in the sector. This study, if properly utilized, may also enable employers of the sector by increasing their knowledge about OHS practices and, as a result, trying to offer safer environments for their workers.

  4. Site-specific issues related to structural/seismic design of an underground independent spent fuel storage installation (ISFSI)

    International Nuclear Information System (INIS)

    Tripathi, B.P.

    2005-01-01

    Utilities owning and operating commercial nuclear power plants (NPP) in USA may choose to build an underground Independent Spent Fuel Storage Installation (ISFSI) to store the spent nuclear fuels. The regulatory requirements and other guidance are based on 10 CFR Part 72, Regulatory Guide RG 3.73, Standard Review Plans NUREG-1536 and NUREG-1567, and Interim staff Guidance (ISG) documents as applicable. Structures, Systems, and Components (SSCs) classified as important to safety are designed to withstand the effects of site-specific environmental conditions and natural phenomena such as earthquake, tornado, flood, etc. An underground ISFSI for storage of spent nuclear fuel, presents some unique analysis and design challenges. This paper will briefly address some of these challenges and discuss site-specific loads, including seismic for the ISFSI design. (authors)

  5. Collaborative Russian-US work in nuclear material protection, control and accounting at the Institute of Physics and Power Engineering. 3: Emphasis on site-wide issues

    International Nuclear Information System (INIS)

    Kuzin, V.V.; Pshakin, G.M.; Belov, A.P.

    1997-07-01

    During 1997, collaborative Russian-US nuclear material protection, control, and accounting (MPC and A) tasks at the Institute of Physics and Power Engineering (IPPE) in Obninsk, Russia are focusing increasingly on site-wide issues, though there is continued work at several major facilities: the Fast Critical Facility, the Technological Laboratory for Fuel Fabrication, and the (new and existing) Central Storage Facility. The collaborative work is being done with US Department of Energy National Laboratories. IPPE's emphasis on site-wide issues has resulted in the formation of a separate division for MPC and A. This new division reports directly to the IPPE Chief Engineer. It is a separate scientific and engineering operating division responsible for coordination and harmonization of MPC and A at IPPE, as well as for audit, assessment and inspection. By virtue of the organizational independence of this new division, IPPE has significantly strengthened the role of MPC and A. Two specific site-wide accomplishments are the consolidation of nuclear material from many buildings to a smaller number, and, as a major part of this strategy, the construction of a nuclear island surrounding the Fast Critical Facility and the new Central Storage Facility. Most of IPPE's weapons-grade nuclear materials will be concentrated within the nuclear island. The paper summarizes the following technical elements: computerized accounting, bar coding, weight measurements, gamma-ray measurements, tamper indicating devices, procedures for physical inventory taking and material balance closure, and video monitoring systems for storage and critical assembly areas

  6. Risk management at hazardous waste sites

    International Nuclear Information System (INIS)

    Travis, C.C.; Doty, C.B.

    1990-01-01

    The Superfund Amendments and Reauthorization Act of 1986 (SARA) provided the Environmental Protection Agency (EPA) with additional resources and direction for the identification, evaluation, and remediation of hazardous waste sites in the United States. SARA established more stringent requirements for the Superfund program, both in terms of the pace of the program and the types of remedial alternatives selected. The central requirement is that remedial alternatives be ''protective of public health and the environment'' and ''significantly and permanently'' reduce the toxicity, mobility, or volume of contaminants. The mandate also requires that potential risk be considered in the decision-making process. This document discusses risk management at hazardous waste sites. Topics include selection of sites for placement on the National Priority List, risk assessment and the decision process, risk reduction and remedial alternative selection, and aquifer restoration. 10 refs., 2 figs

  7. The StreamCat Dataset: Accumulated Attributes for NHDPlusV2 (Version 2.1) Catchments Riparian Buffer for the Conterminous United States: Facility Registry Services (FRS) : Toxic Release Inventory (TRI) , National Pollutant Discharge Elimination System (NPDES) , and Superfund Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset represents the estimated density of georeferenced sites within individual, local NHDPlusV2 catchments and upstream, contributing watersheds riparian...

  8. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE ITER

    Science.gov (United States)

    In Fall 1994, anaerobic compost wetlands in both upflow and downflow configurations were constructed adjacent to and received drainage from the Burleigh Tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The e...

  9. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE TECHNOLOGY CAPSULE

    Science.gov (United States)

    In fall 1994, anaerobic compost wetlands in both upflow and down flow configurations were constructed adjacent to and received drainage from the Burleigh tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The ...

  10. Regulatory analysis for the resolution of Generic Issue 130: Essential service water system failures at multi-unit sites

    International Nuclear Information System (INIS)

    Leung, V.; Basdekas, D.; Mazetis, G.

    1991-06-01

    The essential service water system (ESWS) is required to provide cooling in nuclear power plants during normal operation and accident conditions. The ESWS typically supports component cooling water heat exchangers, containment spray heat exchangers, high-pressure injection pump oil coolers, emergency diesel generators, and auxiliary building ventilation coolers. Failure of the ESWS function could lead to severe consequences. This report presents the regulatory analysis for GI-130, ''Essential Service Water System Failures at Multi-Unit Sites.'' The risk reduction estimates, cost/benefit analyses, and other insights gained during this effort have shown that implementation of the recommendations will significantly reduce risk and that these improvements are warranted in accordance with the backfit rule, 10 CFR 50.109(a)(3). 19 refs., 16 tabs

  11. California Energy Incentive Programs: An Annual Update on Key Energy Issues and Financial Opportunities for Federal Sites in California

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-12-01

    A spate of recently enacted energy legislation and associated program changes is providing numerous opportunities to help California federal energy managers cut costs and meet their renewables, energy efficiency and GHG emissions goals. In April 2011, Governor Jerry Brown approved the nation’s most ambitious renewable portfolio standard (RPS), which requires 33% of the state’s electricity to come from renewable energy sources by 2020. Policy changes that will support the RPS include expanded eligibility rules that fill previous gaps in incentives for certain sizes of on-site renewable energy systems. Program updates described in this document include: $200 million more in funding for California Solar Initiative rebates to commercial and industrial customers; an increase in the eligible system size for the Feed-In-Tariff (FIT) from 1.5MW to 3MW; and pending changes that may allow customer-side systems to sell tradable renewable energy credits (TRECs) to entities with RPS compliance obligations in California.

  12. An analysis of inhabitants opinion on energy issues. Comparison between localities of nuclear installation sites and of urban communities

    International Nuclear Information System (INIS)

    Takahashi, Reiko; Nakagome, Yoshihiro

    2004-01-01

    For the purpose of comparing the mental attitudes toward nuclear power generation held by the public between localities containing nuclear installation sites and those of urban communities, a survey has been conducted by mail and by direct interviews. The survey conversed Fukushima, Niigata and Fukui Prefectures, representing the former group of localities, whereas Tokyo and Osaka, representing the latter. The mail survey revealed differences between the two groups of localities in their image of power and in their perception of its present status, as well as in their sense of values in daily life. The interview survey indicated that the factors behind the differences included regional characteristics such as temperaments of resident population, and effects on the private life style brought by nuclear installation. Narrowing down this gap of mental attitude between the two groups of localities should call indispensably for better mutual understanding. In bringing this about, consideration should be given to particular local characteristics, including popular mentality and personal view of life, as well as image and knowledge of energy sources held by the individuals. (author)

  13. Analysis of risk indicators and issues associated with applications of screening model for hazardous and radioactive waste sites

    International Nuclear Information System (INIS)

    Buck, J.W.; Strenge, D.L.; Droppo, J.G. Jr.

    1990-12-01

    Risk indicators, such as population risk, maximum individual risk, time of arrival of contamination, and maximum water concentrations, were analyzed to determine their effect on results from a screening model for hazardous and radioactive waste sites. The analysis of risk indicators is based on calculations resulting from exposure to air and waterborne contamination predicted with Multimedia Environmental Pollutant Assessment System (MEPAS) model. The different risk indicators were analyzed, based on constituent type and transport and exposure pathways. Three of the specific comparisons that were made are (1) population-based versus maximum individual-based risk indicators, (2) time of arrival of contamination, and (3) comparison of different threshold assumptions for noncarcinogenic impacts. Comparison of indicators for population- and maximum individual-based human health risk suggests that these two parameters are highly correlated, but for a given problem, one may be more important than the other. The results indicate that the arrival distribution for different levels of contamination reaching a receptor can also be helpful in decisions regarding the use of resources for remediating short- and long-term environmental problems. The addition of information from a linear model for noncarcinogenic impacts allows interpretation of results below the reference dose (RfD) levels that might help in decisions for certain applications. The analysis of risk indicators suggests that important information may be lost by the use of a single indicator to represent public health risk and that multiple indicators should be considered. 15 refs., 8 figs., 1 tab

  14. Regulatory and institutional issues impending cleanup at US Department of Energy sites: Perspectives gained from an office of environmental restoration workshop

    Energy Technology Data Exchange (ETDEWEB)

    Fallon, W E; Gephart, J M; Gephart, R E; Quinn, R D; Stevenson, L A

    1991-05-01

    The US Department of Energy's (DOE) nuclear weapons and energy operations are conducted across a nation-wide industrial complex engaged in a variety of manufacturing, processing, testing, and research and development activities. The overall mission of DOE Office of Environmental Restoration and Waste Management (EM) is to protect workers, the public, and the environment from waste materials generated by past, current, and future DOE activities and to bring the DOE complex into compliance with all applicable laws, regulations, and agreements related to health, safety, and the environment. EM addresses this broad mandate through related and interdependent programs that include corrective actions, waste operations, environmental restoration, and technology development. The EM Office of Environmental Restoration (EM-40) recognizes the importance of implementing a complex-wide process to identify and resolve those issues that may impede progress towards site cleanup. As a first step in this process, FM-40 sponsored an exercise to identify and characterize major regulatory and institutional issues and to formulate integrated action steps towards their resolution. This report is the first product of that exercise. It is intended that the exercise described here will mark the beginning of an ongoing process of issue identification, tracking, and resolution that will benefit cleanup activities across the DOE complex.

  15. To the Issue of Search For New Radioprotectors Made of Vegetative Raw Materials of the Former Semipalatinsk Test Site

    International Nuclear Information System (INIS)

    Muzychkina, R.A.; Abilov, Zh.A.; Omarkamzinova, V.B.; Burasheva, G.Sh.; Zhusupova, G.E.; Seisebaev, A.T.; Kadyrova, N.Zh.; Karabalin, B.K.

    1998-01-01

    The problem of organism protection against the radiation damage is of particular importance in view of new tasks of atomic energy, radioecology and radiation biotechnology development, One of the promising directions of the chemical protection development is the search for natural anti-radiation compounds and preparations made of the vegetative raw material of Kazakstan. Our many-year experience in the fields of chemistry of biologically active compounds of plants and experimental radiobiology speaks for the need of new approaches and sources of radiomodifying compounds. The members of the chair for the Chemistry of Natural Compounds of the AI-Farabi's Kazakh State University have been involved in study of the chemical composition of plants growing on the territory of Kazakstan for over 30 years. There is an experimental data bank for over 300 species of herbs and other plants. The investigation of the chemical composition of plants from the contaminated territories of the former Semipalatinsk Test Site (STS) has been started. The experimental data on these plants testifies on the significant change in the composition of some natural compounds and their quantitative content as compared to the analogues species growing in the ecologically favorable regions. It is supposed that the chronic irradiation of several plant generation by even low doses during the several generations leads to the alteration of the metabolism and non-specific accumulation of certain groups of biologically active compounds (substances of polyphenol nature, kinone, hydro sulphur groups, ascorbic acid, melanin, etc.). One of the mechanisms of plant radioresistance and radiation adaptation to the elevated radiation background can be caused by the accumulation of radioprotective substances by plants. The preliminary study of radiomodifying properties of some compounds made of polyphenols of plants allowed to obtain a number of compounds with the stable radioprotective effect. The experiments

  16. FOCUSED FEASIBILITY STUDY OF PHYTOREMEDIATION ALTERNATIVE FOR THE INDUSTRIAL EXCESS LANDFILL SITE IN STARK COUNTY, OHIO.

    Science.gov (United States)

    Focused feasibility study of phytoremediation alternative for the Industrial Excess Landfill site in Stark County, Ohio. More information can be found on the NPL Fact Sheet for this site at www.epa.gov/region5/superfund/npl/ohio/OHD000377971.htm

  17. 76 FR 13616 - Picayune Wood Treating Site Picayune, Pearl River County, MS; Notice of Settlement

    Science.gov (United States)

    2011-03-14

    ... ENVIRONMENTAL PROTECTION AGENCY [Docket EPA-RO4-SFUND-2011-0201, FRL-9280-3] Picayune Wood... entered into a settlement for reimbursement of past response costs concerning the Picayune Wood Treating... No. EPA-RO4- SFUND-2011-0201 or Site name Picayune Wood Treating Superfund Site by one of the...

  18. CERCLA site assessment workbook, Volume 1

    International Nuclear Information System (INIS)

    1994-08-01

    This workbook provides instructions for planning, implementing, and reporting site assessments under CERCLA, commonly referred to as Superfund. Site assessment consists of two information-gathering steps: the remedial preliminary assessment (PA) and the site inspection (SI). The information obtained is then used to estimate, or score, a site's relative risk to public health and the environment. The score is derived via the hazard ranking system (HRS). Although the workbook and its exercises can be adapted to group study, it is designed primarily for use by an individual

  19. Residential cancer cluster investigation nearby a Superfund Study Area with trichloroethylene contamination.

    Science.gov (United States)

    Press, David J; McKinley, Meg; Deapen, Dennis; Clarke, Christina A; Gomez, Scarlett Lin

    2016-05-01

    Trichloroethylene (TCE) is an industrial solvent associated with liver cancer, kidney cancer, and non-Hodgkin's lymphoma (NHL). It is unclear whether an excess of TCE-associated cancers have occurred surrounding the Middlefield-Ellis-Whisman Superfund site in Mountain View, California. We conducted a population-based cancer cluster investigation comparing the incidence of NHL, liver, and kidney cancers in the neighborhood of interest to the incidence among residents in the surrounding four-county region. Case counts and address information were obtained using routinely collected data from the Greater Bay Area Cancer Registry, part of the Surveillance, Epidemiology, and End Results program. Population denominators were obtained from the 1990, 2000, and 2010 US censuses. Standardized incidence ratios (SIRs) with two-sided 99 % confidence intervals (CIs) were calculated for time intervals surrounding the US Censuses. There were no statistically significant differences between the neighborhood of interest and the larger region for cancers of the liver or kidney. A statistically significant elevation was observed for NHL during one of the three time periods evaluated (1996-2005: SIR = 1.8, 99 % CI 1.1-2.8). No statistically significant NHL elevation existed in the earlier 1988-1995 (SIR = 1.3, 99 % CI 0.5-2.6) or later 2006-2011 (SIR = 1.3, 99 % CI 0.6-2.4) periods. There is no evidence of an increased incidence of liver or kidney cancer, and there is a lack of evidence of a consistent, sustained, or more recent elevation in NHL occurrence in this neighborhood. This evaluation included existing cancer registry data, which cannot speak to specific exposures incurred by past or current residents of this neighborhood.

  20. Recycling abandoned lead battery sites

    International Nuclear Information System (INIS)

    Montgomery, A.H.

    1993-01-01

    In the past, automobile batteries were recycled principally for their lead content. The waste generated at battery wrecking facilities consisted of spent acid, crushed casings (ebonite and plastic), and where secondary smelting was involved, matte, slag, and carbon from the smelting process. These waste products were generally disposed in an on-site in a landfill or stored in piles. If the facility shut down because further commercial operations were not financially viable, the waste piles remained to be addressed at a later date through remedial action or reclamation programs. There are many of these facilities in the US. Nationally, about 28 sites have been discovered by the US Environmental Protection Agency (EPA) under the Superfund program and are under investigation or administrative orders for remedial action. A major remediation effort is now underway at the Gould Superfund Site in Portland, Oregon, which was operated as a secondary smelting facility between 1949 and 1981. This paper describes the nature of the contamination at the Gould site and the work conducted by Canonie Environmental Services Corp. (Canonie) to develop a process which would treat the waste from battery wrecking operations and produce revenue generating recyclable products while removing the source contamination (lead) from the site. The full-scale commercial plant is now operating and is expected to achieve a throughput rate of between 200 and 250 tons per day in the coming weeks

  1. Local decision-making facing issues of national interest experiences from the swedish siting process for a spent nuclear fuel repository

    International Nuclear Information System (INIS)

    Soderberg, O.

    1998-01-01

    It is common knowledge that there are difficulties in convincing the general public and their democratically elected representatives that final disposal of spent nuclear fuel can be made in safe way. Special problems for the decision-makers are created by the demands put on today's generations to make a responsible risk assessment in a area with genuine uncertainties and characterised by any expressions of lack of confidence in social institutions. The current Swedish process for siting a deep repository for spent nuclear fuel has evolved during a period of many years, through inputs by the industry, Government, regulatory authorities and concerned municipalities. It is clear that the nuclear industry, represented by the Swedish Nuclear Fuel and Waste Management CO (SKB), has the full responsibility to find a solution to the waste management problem and to implement the solution - and to for this under the supervision of Government and regulating authorities. But, given the strong tradition of local self-government, the concerned municipalities, the local population in this process. this is simply the following fact: For people who have engaged themselves in local politics - and are prepared to take their responsibility for the well-being and development of their local community - the issue of a possible nuclear repository in the neighbourhood is difficult to handle. A relevant question is: Why should the nation as a whole expect these locally elected representatives to feel a responsibility for an issue of national importance? (author)

  2. Hydrologic issues in repository siting

    International Nuclear Information System (INIS)

    Remson, I.; Gorelick, S.M.

    1982-01-01

    Extrapolation of Darcy's law to the transport of water an solutes in unfractured poorly permeable rocks being studied for nuclear waste disposal is questioned. The hydrologic literature includes numerous references to both non-Darcian flow in dense materials devoid of macrofractures and microfractures and to threshold gradients below which no flow occurs. For such situations to occur, the pore-size range must be small enough so that all pore water is sufficiently close to mineral surfaces to be affected by the surficial forces. Then the flow will be non-Newtonian and non-Darcian, and solute transport will be by molecular diffusion. If fluid transport in very dense unfractured rocks is non-Darcian, useful methods of testing candidate host rocks become apparent. In situ nondestructive pressure testing of canister waste emplacement boreholes in a mined repository can verify the absence of both fracture flow and Darcian flow. 18 references

  3. EMERGING TECHNOLOGY BULLETIN: RECLAMATION OF LEAD FROM SUPERFUND WASTE MATERIAL USING SECONDARY LEAD SMELTERS

    Science.gov (United States)

    This process involves incorporating lead-contaminated Superfund waste with the regular feed to a secondary lead smelter. Since secondary lead smelters already recover lead from recycled automobile batteries, it seems likely that this technology could be used to treat waste from ...

  4. Evaluating public participation in environmental decision-making: EPA's superfund community involvement program.

    Science.gov (United States)

    Susan Charnley; Bruce. Engelbert

    2005-01-01

    This article discusses an 8-year, ongoing project that evaluates the Environmental Protection Agency's Superfund community involvement program. The project originated as a response to the Government Performance and Results Act, which requires federal agencies to articulate program goals, and evaluate and report their progress in meeting those goals. The evaluation...

  5. 77 FR 21433 - Regulated Navigation Area; Pacific Sound Resources and Lockheed Shipyard EPA Superfund Cleanup...

    Science.gov (United States)

    2012-04-10

    ... superfund cleanup remediation efforts. This RNA will prohibit activities that would disturb the seabed, such... or capped are arsenic, copper, lead, mercury, zinc, PAHs and PCBs. The metal contaminants were... installed in the designated regulated navigation area, pursuant to the remediation efforts of the U.S...

  6. Technology needs and trends for hazardous waste site remediation

    International Nuclear Information System (INIS)

    Kovalick, W.W. Jr.

    1995-01-01

    Over the next few decades, federal, state, and local governments and private industry will commit billions of dollars annually to clean up sites contaminated with hazardous waste and petroleum products. While these needs represent an obligation for society, they also represent an important business opportunity for vendors of remediation services. This presentation assesses the remediation market by characterizing sites that comprise the demand for cleanup services, observing remedy selection trends in the Superfund program, and discussing gaps in the supply of technologies

  7. Mohawk Tannery Hazardous Waste Site in New Hampshire included on EPA List of Targeted for Immediate Attention

    Science.gov (United States)

    Today, the U.S. Environmental Protection Agency released the list of Superfund sites that Administrator Pruitt has targeted for immediate and intense attention. The former Mohawk Tannery facility (a.k.a. Granite State Leathers) is one of the 21 sites on th

  8. Site-specific data confirm arsenic exposure predicted by the U.S. Environmental Protection Agency.

    OpenAIRE

    Walker, S; Griffin, S

    1998-01-01

    The EPA uses an exposure assessment model to estimate daily intake to chemicals of potential concern. At the Anaconda Superfund site in Montana, the EPA exposure assessment model was used to predict total and speciated urinary arsenic concentrations. Predicted concentrations were then compared to concentrations measured in children living near the site. When site-specific information on concentrations of arsenic in soil, interior dust, and diet, site-specific ingestion rates, and arsenic abso...

  9. Use of risk to resolve conflicts in assessing hazards at mixed-waste sites

    International Nuclear Information System (INIS)

    Rechard, R.P.; Chu, M.S.Y.

    1991-01-01

    Two main issues contribute to the assessment of health hazard from mixed waste: the scientific methods to assess these materials and the legislative and regulatory control of these materials. This paper is primarily concerned with the scientific method of assessing hazards from mixed waste (i.e., carcinogenic chemicals, noncarcinogenic chemicals, and radioactive material). This paper discusses SRS, a Site Ranking System, and its use of risk concepts to avoid introducing new inconsistencies when ranking mixed-waste sites. SRS ranks each site by scoring factors that influence the human health risk. The factors are (1) the potentially exposed population, (2) the average amount of exposure to the waste, and (3) the toxicity of the waste. The relative risk of a release is measured as the product of these three factors. The third factor, toxicity, is indexed with a single score, but because methods of measuring toxicity differ for carcinogenic chemicals, noncarcinogenic chemicals, and radionuclides, comparison can be difficult; hence, this paper also summarizes the logic and assumptions used to make toxicity comparisons in SRS. As may be expected, results from a ranking scheme based on risk are different from results generated by the original Hazard Ranking System (HRS), used by the Environmental Protection Agency. This paper briefly discusses these differences for five Superfund sites (no mixed waste). The legislative and regulatory control of these materials to protect human health is also discussed. 37 refs., 1 tab

  10. 76 FR 1154 - Operating Industries, Inc., Superfund Site, Monterey Park, CA; Notice of Proposed CERCLA...

    Science.gov (United States)

    2011-01-07

    ... Electric Company, as successor by merger to Reliance Electric Company (fka Reliance Electric Industrial... Car Wash General Partnership, Bimbo Bakeries USA, Inc., Bimbo Foods, Inc., successor-in-interest to... Supply, LLC, L-3 Services, [[Page 1156

  11. Technical Guidelines on Performing a Sediment Erosion and Deposition Assessment (SEDA) at Superfund Sites

    Science.gov (United States)

    2014-09-01

    introduced to a water body because of the failure of a river bank due to, for example, flow-induced erosion of the bank toe and/or surface, or...under supercritical flows (with Froude number greater than one). Antidunes are usually more symmetrical (in their longitudinal profile) than dunes ... dunes , and anti- dunes . Bedload Sediment material moving on top of or near a channel bed by rolling, sliding, and saltating, i.e., jumping

  12. 78 FR 5801 - Operating Industries, Inc. Superfund Site, Monterey Park, CA; Notice of Proposed CERCLA...

    Science.gov (United States)

    2013-01-28

    ... Metals Corporation, R.R. Kellogg, Inc., Ralphs Grocery Company, RCG Electronics Corp., dba Washington... (CERCLA), 42 U.S.C. 9622(i) and Section 7003(d) of the Resource Conservation and Recovery Act, as amended (RCRA), 42 U.S.C. 6973, notice is hereby given of a proposed administrative settlement with 47 de...

  13. 78 FR 44119 - Circle Environmental #1 Superfund Site; Dawson, Terrell County, Georgia; Notice of Settlement

    Science.gov (United States)

    2013-07-23

    ..., Compensation and Liability Act (CERCLA), the United States Environmental Protection Agency has entered into a..., Terrell County, Georgia. The settlement addresses cost incurred by the agency in conducting a fund lead...

  14. IN SITU OXIDATION FIELD PILOT OF 1,4-DIOXANE AT THE COOPER DRUM SUPERFUND SITE

    Science.gov (United States)

    1,4-Dioxane, a solvent in paints, varnishes, lacquers, cosmetics, deodorants, cleaning and detergent preparations fluids, has attracted a lot of notice recently because its chemical analytical detection limit has recently been lowered from 50 µg/L to 1 µg/L. It is now commonly de...

  15. CO2 Sparging Proof of Concept Test Report, Revision 1, LCP Chemicals Site, Brunswick, Georgia

    Science.gov (United States)

    April 2013 report to evaluate the feasibility of CO2 sparging to remediate a sub-surface caustic brine pool (CBP) at the LCP Chemicals Superfund Site, GA. Region ID : 04, DocID: 10940639 , DocDate: 2013-04-01

  16. Thermal impact of a small alas-valley river in a continuous permafrost area - insights and issues raised from a field monitoring Site in Syrdakh (Central Yakutia)

    Science.gov (United States)

    Grenier, Christophe; Nicolas, Roux; Fedorov, Alexander; Konstantinov, Pavel; Séjourné, Antoine; Costard, François; Marlin, Christelle; Khristoforov, Ivan; Saintenoy, Albane

    2017-04-01

    river, in the atmosphere and into boreholes in the permafrost, at different locations and various distances from the river and the upstream lake. Hydrological information was collected as well (e.g. water temperature, electrical conductivity, pH and isotopic profiles; river flow rates). Soil properties were studied in pits (e.g. thermal conductivity, soil humidity and temperature measurements). More recently GPR studies were conducted along river profiles complementing the dataset. This new study site is introduced and the major results are presented as well as the main issues raised and future perspectives.

  17. Denver radium site's - Case history

    International Nuclear Information System (INIS)

    Topolski, T.T.

    1985-01-01

    In developing this case history of the Denver radium sites, an attempt is made to establish the Colorado carnotite connection from the point of discovery to early development and its eventual role in the inception of the National Radium Institute and Denver's radium legacy. Early exploitive mining activities and the exportation of the highest grades of uranium ore to Europe greatly disturbed key officials at the U.S. Bureau of Mines. With its proximity to known carnotite deposits and industrial capacity, Denver's destiny as one of America's early radium production centers became a reality by 1914. With African pitchblend discoveries, Belgium competition spelled the beginning of the end of Denver's romance with radium by 1920. The sites where Denver made or used its radium were lost in obscurity for 60 years and rediscovered in 1979. Thirty one sites and a characterization of their radioactive impact are now a part of the Superfund National Priorities listing for eventual cleanup

  18. Superfund Hazard Ranking System Training Course: Table of Contents

    Science.gov (United States)

    The Hazard Ranking System (HRS) training course is a four and ½ day, intermediate-level course designed for personnel who are required to compile, draft, and review preliminary assessments (PAs), site inspections (SIs), and HRS documentation records/packag

  19. Energy infrastructure of the United States and projected siting needs: Scoping ideas, identifying issues and options. Draft report of the Department of Energy Working Group on Energy Facility Siting to the Secretary

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    A Department of Energy (DOE) Working Group on Energy Facility Siting, chaired by the Policy Office with membership from the major program and staff offices of the Department, reviewed data regarding energy service needs, infrastructure requirements, and constraints to siting. The Working Group found that the expeditious siting of energy facilities has important economic, energy, and environmental implications for key Administration priorities.

  20. Superfund Record of Decision (EPA Rregion 4): Oak Ridge Reservation (USDOE), (Operable Unit 3), Anderson County, Oak Ridge, TN. (Second remedial action), September 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Oak Ridge Reservation (ORR) (USDOE) (Operable Unit 3) site is an active nuclear weapons component manufacturing facility located in Oak Ridge, Anderson County, Tennessee. The Y-12 plant, which is addressed as Operable Unit 3, is one of several hundred waste disposal sites or areas of contamination at the ORR site requiring Superfund remedial action. The site occupies the upper reaches of East Fork Poplar Creek (EFPC) in Bear Creek Valley. From 1940 to the present, the Y-12 plant has been used to produce nuclear weapons components. From 1955 to 1963, mercury was used in a column-exchange process to separate lithium isotopes. Testing of the three concrete tanks showed that the tank sediment contained mercury, and that contaminated waste is still being discharged into two of the three tanks. The Record of Decision (ROD) focuses on the contaminated sediment in the sedimentation tanks as an interim action. The primary contaminants of concern affecting the sediment are mercury, a metal and radioactive materials. The selected interim remedial action for the site is included

  1. Current issues and actions

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the progress that has been made toward achieving full regulatory compliance at the Hanford Site. Ongoing compliance self-assessments, implementation of the Tri-Party Agreement, and public meetings continue to identify environmental compliance issues. These issues are discussed openly with the regulatory agencies and with the public to ensure that all environmental compliance issues are addressed.

  2. Current issues and actions

    International Nuclear Information System (INIS)

    Black, D.G.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the progress that has been made toward achieving full regulatory compliance at the Hanford Site. Ongoing compliance self-assessments, implementation of the Tri-Party Agreement, and public meetings continue to identify environmental compliance issues. These issues are discussed openly with the regulatory agencies and with the public to ensure that all environmental compliance issues are addressed

  3. Uranium and nuclear issues

    International Nuclear Information System (INIS)

    1983-01-01

    This seminar focussed on the major issues affecting the future of the entire nuclear fuel cycle. In particular it covered issues bearing on the formation of public policy in relation to the use of uranium as an energy source: economic risk, industrial risks, health effects, site selection, environmental issues, and public acceptance

  4. Superfund 16: Conference and exhibition proceedings. Volume 2

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This conference was held November 6--8, 1995 in Washington, D.C. The purpose of the conference was to provide a multidisciplinary forum dealing with state-of-the-art methods and site characterization technologies for environmental monitoring and remedial action planning of hazardous wastes. Individual papers have been processed separately for inclusion in the appropriate data bases

  5. Superfund 16: Conference and exhibition proceedings. Volume 1

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This conference was held November 6--8, 1995 in Washington, D.C. The purpose of the conference was to provide a multidisciplinary forum dealing with state-of-the-art methods and site characterization technologies for environmental monitoring and remedial action planning of hazardous wastes. Individual papers have been processed separately for inclusion in the appropriate data bases

  6. 77 FR 40318 - Availability of Addendum to Documentation Supporting the Proposal of the Leeds Metal Site to the...

    Science.gov (United States)

    2012-07-09

    ... policy is that all comments received will be included in the public Docket without change and may be made..., email: [email protected] , Site Assessment and Remedy Decisions Branch, Assessment and Remediation Division, Office of Superfund Remediation and Technology Innovation (Mail Code 5204P), U.S. Environmental...

  7. DELTA-13C VALUES OF POLYCYCLIC AROMATIC HYDROCARBONS (PAHS) COLLECTED FROM TWO CREOSOTE-CONTAMINATED WASTE SITES

    Science.gov (United States)

    Groundwater samples were collected from the American Creosote Works (ACW) Superfund site in Pensacola, Florida in June and September 1994. Sampling wells were located along a transect leading away from the most contaminated area. PAHs were extracted from the groundwater samples w...

  8. Initial data of seismic input and soil conditions of Kozloduy NPP site. Extension to Part 2 soil conditions, issued October '93

    International Nuclear Information System (INIS)

    Boyadjiev, Z.

    1995-01-01

    On the basis of the results of the carried out experimental (laboratory and in situ) investigations of the dynamic characteristics, the following conclusions for the Kozloduy NPP site are presented. (1) The established through experimental studies relationships for the shear module and the damping factor as strain dependent of representative samples of soils of the site profile, can be used for all similar soils in the profile in the different parts of the site, taking into account the possible differences by means of the initial shear module in the normalized relationship for the respective generalized soil type. (2) When solving the problems of the site response and the 'soil - structure analysis', the geotechnical seismic model of the 'free field' profile can be assumed for all parts of the NPP site. (3) The changes of the lithological profile in different parts of the site, in respect to type and thickness, as well as in view of the different way and depth of the NPP structures foundation, make it necessary the elaboration of a geotechnical seismic model of the profile below the foundation plates of the reactor buildings of the NPP units in each particular case. These models can be made out on the basis of the summarized data about the shear velocities of the soil types, the lithological data of the studied boreholes in these places and the data having natural bulk density from 30 - 40 m depth determined by the laboratory studies of samples of these soils, assuming with approximation that the geotechnical seismic model below this depth is the same as the one of the 'free field'. (4) Studies have been carried out through in situ and laboratory studies of all the fundamental structures on the NPP site and the results of them are sufficient as an addition to the present initial data for solving the problems of the site response and the 'soil-structure inter-action' analyses of each structure

  9. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  10. US EPA record of decision review for landfills: Sanitary landfill (740-G), Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report presents the results of a review of the US Environmental Protection Agency (EPA) Record of Decision System (RODS) database search conducted to identify Superfund landfill sites where a Record of Decision (ROD) has been prepared by EPA, the States or the US Army Corps of Engineers describing the selected remedy at the site. ROD abstracts from the database were reviewed to identify site information including site type, contaminants of concern, components of the selected remedy, and cleanup goals. Only RODs from landfill sites were evaluated so that the results of the analysis can be used to support the remedy selection process for the Sanitary Landfill at the Savannah River Site (SRS).

  11. US EPA record of decision review for landfills: Sanitary landfill (740-G), Savannah River Site

    International Nuclear Information System (INIS)

    1993-06-01

    This report presents the results of a review of the US Environmental Protection Agency (EPA) Record of Decision System (RODS) database search conducted to identify Superfund landfill sites where a Record of Decision (ROD) has been prepared by EPA, the States or the US Army Corps of Engineers describing the selected remedy at the site. ROD abstracts from the database were reviewed to identify site information including site type, contaminants of concern, components of the selected remedy, and cleanup goals. Only RODs from landfill sites were evaluated so that the results of the analysis can be used to support the remedy selection process for the Sanitary Landfill at the Savannah River Site (SRS)

  12. Fusion Canada issue 27

    International Nuclear Information System (INIS)

    1995-03-01

    A short bulletin from the National Fusion Program highlighting in this issue ITER reactor siting, a major upgrade for TdeV tokamak, Ceramic Breeders: new tritium mapping technique and Joint Fusion Symposium. 2 figs

  13. Heterogeneous redox conditions, arsenic mobility, and groundwater flow in a fractured-rock aquifer near a waste repository site in New Hampshire, USA

    Science.gov (United States)

    Anthropogenic sources of carbon from landfill or waste leachate can promote reductive dissolution of in situ arsenic (As) and enhance the mobility of As in groundwater. Groundwater from residential-supply wells in a fractured crystalline-rock aquifer adjacent to a Superfund site ...

  14. Nuclear safety - Topical issues

    International Nuclear Information System (INIS)

    1995-01-01

    The following topical issues related to nuclear safety are discussed: steam generators; maintenance strategies; control rod drive nozzle cracks; core shrouds cracks; sump strainer blockage; fire protection; computer software important for safety; safety during shutdown; operational safety experience; external hazards and other site related issues. 5 figs, 5 tabs

  15. Savannah River Site RCRA/CERCLA/NEPA integrated investigation case study

    International Nuclear Information System (INIS)

    Clark, D.R.; Thomas, R.; Wilson, M.P.

    1992-01-01

    The Savannah River Site (SRS) is a US Department of Energy facility placed on the Superfund National Priority List in 1989. Numerous past disposal facilities and contaminated areas are undergoing the integrated regulatory remediation process detailed in the draft SRS Federal Facility Agreement. This paper will discuss the integration of these requirements by highlighting the investigation of the D-Area Burning/Rubble Pits, a typical waste unit at SRS

  16. THM-issues in repository rock. Thermal, mechanical, thermo-mechanical and hydro-mechanical evolution of the rock at the Forsmark and Laxemar sites

    Energy Technology Data Exchange (ETDEWEB)

    Hoekmark, Harald; Loennqvist, Margareta; Faelth, Billy (Clay Technology AB, Lund (Sweden))

    2010-05-15

    The present report addresses aspects of the Thermo-Hydro-Mechanical (THM) evolution of the repository host rock that are of potential importance to the SR-Site safety assessment of a KBS-3 type spent nuclear fuel repository. The report covers the evolution of rock temperatures, rock stresses, pore pressures and fracture transmissivities during the excavation and operational phase, the temperate phase and a glacial cycle on different scales. The glacial cycle is assumed to include a period of pre-glacial permafrost with lowered temperatures and with increased pore pressures in the rock beneath the impermeable permafrost layer. The report also addresses the question of the peak temperature reached during the early temperate phase in the bentonite buffer surrounding the spent fuel canisters. The main text is devoted exclusively to the projected THM evolution of the rock at the Forsmark site in central Sweden. The focus is on the potential for stress-induced failures, i.e. spalling, in the walls of the deposition holes and on changes in the transmissivity of fractures and deformation zones. All analyses are conducted by a combination of numerical tools (3DEC) and analytical solutions. All phases are treated separately and independently of each other, although in reality construction will overlap with heat generation because of the step-by-step excavation/deposition approach with some 50 years between deposition of the first and last canisters. It is demonstrated here that the thermal and thermo-mechanical evolution of the near-field will be independent of heat generated by canisters that were deposited in the past, provided that deposition is made in an orderly fashion, deposition area by deposition area. Peak temperatures and near-field stresses can, consequently, be calculated as if all canisters were deposited simultaneously. The canister and tunnel spacing is specified such that the peak buffer temperature will not exceed 100 deg C in any deposition hole, i.e. not

  17. On site clean up with a hazardous waste incinerator

    International Nuclear Information System (INIS)

    Cross, F.L. Jr.; Tessitore, J.L.

    1987-01-01

    The Army Corps of Engineers and the EPA have determined that on-site incineration for the detoxification of soils, sediments, and sludges is a viable, safe, and economic alternative. This paper discusses an approach to on-site incineration as a method of detoxification of soils/sediments contaminated with organic hazardous wastes. Specifically, this paper describes the procedures used to evaluate on-site incineration at a large Superfund site with extensive PCB contaminated soils and sediments. The paper includes the following: (1) a discussion of site waste quantities and properties, (2) a selection of an incineration technology with a resulting concept and design, (3) a discussion of incinerator permitting requirements, (4) discussion and rationale for an incinerator sub-scale testing approach, and (5) analysis of on-site incineration cost

  18. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads, drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI

  19. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada; Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads, drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.

  20. In-situ bioremediation at the French Limited Site

    International Nuclear Information System (INIS)

    Woodward, R.; Ramsden, D.

    1990-01-01

    In situ biodegradation of petrochemical wastes at the French Limited Superfund Site was stimulated by providing the appropriate pH, essential nutrients, oxygen, and substrate availability. Fourteen wastewater treatment parameters, plus toxicity, were monitored to document the program of bioremediation. Periodic, organic priority pollutant analysis of mixed liquor, settled sludges and subsoils provided data for kinetics interpretation and half life calculation. The half lives of thirteen PAH compounds ranged from 27 to 46 days, in contrast to the degradation rate, in months, reported for these compounds in LTUs. An ambitious air monitoring program measured fugitive emissions at lagoon side, fenceline, and from the lagoon surface by floating flux chamber. The amount of volatiles lost never exceeded 1/2 of the OSHA 8 hr TLV and it could be readily managed by adjusting the intensity and frequency of mixing and aeration. The demonstration confirmed the feasibility of in situ bioremediation and led to one of the first US EPA Record of Decisions to use bioremediation for cleanup of a large Superfund site. A consent Decree outlining the site remedial action program was signed by the PRP task group and published in the Federal Register. This represents a landmark project for in situ bioremediation and has established precedence for use of this technology at CERCLA and RCRA sites nationwide

  1. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  2. Family Issues

    Science.gov (United States)

    ... es Autismo? Family Issues Home / Living with Autism / Family Issues Stress Siblings A child’s autism diagnosis affects every member of the family in different ways. Parents/caregivers must now place their ... may put stress on their marriage, other children, work, finances, and ...

  3. Global Issues

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, J.L.

    2001-10-15

    Global Issues is an introduction to the nature and background of some of the central issues - economic, social, political, environmental - of modern times. This new edition of this text has been fully updated throughout and features expanded sections on issues such as global warming, biotechnology, and energy. Fully updated throughout and features expanded sections on issues such as global warming, biotechnology, and energy. An introduction to the nature and background of some of the central issues - economic, social, political, environmental - of modern times. Covers a range of perspectives on a variety of societies, developed and developing. Extensively illustrated with diagrams and photographs, contains guides to further reading, media, and internet resources, and includes suggestions for discussion and studying the material. (author)

  4. Fusion Canada issue 15

    International Nuclear Information System (INIS)

    1991-10-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on the 1996 IAEA Fusion Conference site, operations at the Tokamak de Varennes including divertor pumping of impurities and pumping of carbon monoxide and methane, a discussion of the CFFTP and it's role. 1 fig

  5. Fusion Canada issue 15

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-10-01

    A short bulletin from the National Fusion Program. Included in this issue is a report on the 1996 IAEA Fusion Conference site, operations at the Tokamak de Varennes including divertor pumping of impurities and pumping of carbon monoxide and methane, a discussion of the CFFTP and it`s role. 1 fig.

  6. Fusion Canada issue 25

    International Nuclear Information System (INIS)

    1994-08-01

    A short bulletin from the National Fusion Program highlighting in this issue an economic impact study of the Canadian site for ITER, Harvey Skarsgard: fusion pioneer retires, NFP: Phillips and Holtslander exchange roles, Europe's fusion funding proposals and an update of CCFM/TdeV. 1 fig

  7. Fusion Canada issue 24

    International Nuclear Information System (INIS)

    1994-04-01

    A short bulletin from the National Fusion Program highlighting in this issue the opening of the Garching ITER site, a CCFM/TdeV update,a tritium release field test, measuring radial profile of plasma current density on TdeV, power supplies for TdeV, 5th International Tritium Technology conference, and 1994 basic tritium course. 4 figs

  8. GIS-Mapping and Statistical Analyses to Identify Climate-Vulnerable Communities and Populations Exposed to Superfund Sites

    Science.gov (United States)

    Climate change-related cumulative health risks are expected to be disproportionately greater for overburdened communities, due to differential proximity and exposures to chemical sources and flood zones. Communities and populations vulnerable to climate change-associated impacts ...

  9. 76 FR 35742 - Superfund Site, New Bedford Harbor, New Bedford, MA: Anchorage Ground and Regulated Navigation Area

    Science.gov (United States)

    2011-06-20

    ... National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use... heavy metals. An extensive history and background of the cleanup project can be found on the EPA's Web... entities'' comprises small businesses, not-for-profit organizations that are independently owned and...

  10. SUPERFUND TREATABILITY CLEARINGHOUSE: FINAL REPORT: ON-SITE INCINERATION OF SHIRCO INFRARED SYSTEMS PORTABLE PILOT TEST UNIT, TIMES BEACH, MISSOURI

    Science.gov (United States)

    During the period of July 8 - July 12, 1985, the Shirco Infrared Systems Portable Pilot Test Unit was in operation at the Times Beach Dioxin Research Facility to demonstrate the capability of Shirco's infrared technology to decontaminate silty soil laden with 2,3,7,8-tetrachlorod...

  11. 77 FR 46433 - Proposed CERCLA Administrative Cost Recovery Settlements for the Buckbee-Mears Co. Superfund Site...

    Science.gov (United States)

    2012-08-03

    ... Protection Agency (EPA). ACTION: Notice; request for public comment. SUMMARY: Under Section 122(h) of the... costs of marketing and selling the Properties. Any proceeds from the Bank's foreclosure sale remaining... percentage that the following amounts represent in relation to the combined total of said amounts: (1) For...

  12. CERCLA-linked environmental impact and benefit analysis: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    McNally, Amanda D; Fitzpatrick, Anne G; Mirchandani, Sera; Salmon, Matthew; Edwards, Deborah A

    2018-01-01

    This analysis focused on evaluating the environmental consequences of remediation, providing indicators for the environmental quality pillar of 3 "pillars" of the Portland Harbor Sustainability Project (PHSP) framework (the other 2 pillars are economic viability and social equity). The project an environmental impact and benefit analysis (EIBA) and an EIBA-based cost-benefit analysis. Metrics developed in the EIBA were used to quantify and compare remedial alternatives' environmental benefits and impacts in the human and ecological domains, as a result of remedial actions (relative to no action). The cost-benefit results were used to evaluate whether remediation costs were proportionate or disproportionate to the environmental benefits. Alternatives B and D had the highest overall benefit scores, and Alternative F was disproportionately costly relative to its achieved benefits when compared to the other remedial alternatives. Indeed, the costlier alternatives with larger remedial footprints had lower overall EIBA benefit scores-because of substantially more air emissions, noise, and light impacts, and more disturbance to business, recreational access, and habitat during construction-compared to the less costly and smaller alternatives. Put another way, the adverse effects during construction tended to outweigh the long-term benefits, and the net environmental impacts of the larger remedial alternatives far outweighed their small incremental improvements in risk reduction. Results of this Comprehensive Environmental Response Compensation and Liability Act (CERCLA)-linked environmental analysis were integrated with indicators of economic and social impacts of remediation in a stakeholder values-based sustainability framework. These tools (EIBA, EIBA-based cost-benefit analysis, economic impact assessment, and the stakeholder values-based integration) provide transparent and quantitative evaluations of the benefits and impacts associated with remedial alternatives, and should be applied to complex remediation projects to aid environmental decision making. Integr Environ Assess Manag 2018;14:22-31. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  13. 77 FR 2720 - Proposed Agreement and Covenant Not To Sue for the Colville Post & Poles Superfund Site, Stevens...

    Science.gov (United States)

    2012-01-19

    .... MacDonald, Assistant Regional Counsel, U.S. Environmental Protection Agency, Region 10, 1200 Sixth Avenue, Suite 900, Seattle, Washington 98101; fax: (206) 553-1762; email: MacDonald[email protected] . FOR FURTHER INFORMATION CONTACT: Jennifer G. MacDonald, Assistant Regional Counsel, U.S. Environmental...

  14. 77 FR 52322 - McClellan Air Force Base Superfund Site Proposed Notice of Administrative Order on Consent

    Science.gov (United States)

    2012-08-29

    ... limited liability company. The proposed administrative order on consent concerns cleanup of portions of...; request for public comment. SUMMARY: Notice is hereby given that a proposed administrative order on... of Suitability for Early Transfer (``FOSET''), which has been subject to a public comment period. The...

  15. 76 FR 72405 - San Fernando Valley Area 2 Superfund Site; Notice of Proposed Prospective Purchaser Agreement Re...

    Science.gov (United States)

    2011-11-23

    ... Ohio limited liability company, The Kroger Co., an Ohio corporation, and Ralphs Grocery Company, an...: Environmental Protection Agency (EPA). ACTION: Notice; request for public comment. SUMMARY: The EPA is hereby...

  16. Superfund reauthorization. Hearings before the Subcommittee on Commerce, Transportation, and Tourism of the Committee on Energy and Commerce, House of Representatives, Ninety-Eighth Congress, Second Session on H. R. 4813 and H. R. 4915, February 28, March 1, 8, and 15, 1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    Four days of hearings on two bills (H.R. 4813 and H.R. 4915) designed to provide cleanup funds for hazardous waste sites cover the testimony of 42 witnesses, including that of Environmental Protection Agency Director Ruckelshaus and representatives of the US Chamber of Commerce, government agencies, environmental and other interest groups, the medical profession, the chemical and mining industries, and waste treatment agencies and organizations. The three-year-old Superfund has only cleaned up a few sites, and EPA predicts that the $1.6 billion fund can handle only 170 of the 546 priority sites. The reauthorizing bills increase funding, set cleanup standards, increase enforcement provisions, and encourage a state and federal partnership in the cleanup process. Material submitted for the record follows the text of the two bills and the testimony.

  17. Superfund at work: Hazardous waste cleanup efforts nationwide, fall 1992. (Wide Beach section of Brant, New York)

    International Nuclear Information System (INIS)

    1992-01-01

    Wide-spread contamination of polychlorinated biphenyls (PCBs) threatened the Wide Beach section of Brant, New York, a popular vacation resort. EPA's Superfund program effectively completed a permanent cleanup of Wide Beach in the span of one year. Other highlights included: a new and innovative technology to remove PCB contamination; reduction of PCBs to one-fifth of acceptable levels; temporary relocation of residents who were concerned for their health while cleanup activities took place; newly paved roads and driveways, re-landscaped yards, and a new storm sewer system; and restoration of ecologically sensitive wetlands. EPA's achievements significantly reduced PCB risks at Wide Beach, and left a satisfied community in Brant

  18. Site recycling: From Brownfield to football field

    Energy Technology Data Exchange (ETDEWEB)

    Lee, C.; Haas, W.L. [HDR Engineering Inc., Charlotte, NC (United States)

    1995-07-01

    The Carolina Panther`s new home, Carolinas Stadium, will be impressive. It will include a 75,000-seat stadium, about 2,000 parking spaces, and a practice facility equipped with three full-sized football fields, all located on 30 acres bordering the central business district of Charlotte, NC. Fans of the NFL expansion team may never know that, until recently, 13 of those 30 acres were a former state Superfund site contaminated by a commercial scrapyard that had operated from the early 1930s to 1983. The salvage of nonferrous metals from lead-acid batteries, copper from transformers and other electrical equipment, and ferrous metal scrap from junk automobiles at the Smith Metal and Iron (SMI) site had left a complex contamination legacy. The soil contained lead, polychlorinated biphenyls (PCBs), lesser amounts of semivolatiles (polyaromatic hydrocarbons, or PAHs), and volatile organic compounds and petroleum hydrocarbons. The site had remained dormant, like many former industrial sites that have come be called {open_quotes}brownfields,{close_quotes} for nearly a decade when in 1993, Charlotte was selected as the future home of the Carolina Panthers, a National Football League expansion team. The city was able to attract the team in part by offering to redevelop the site, a prime location adjacent to the downtown area. An eight-month-long site remediation effort by HDR Engineering Inc. was completed March 31, on schedule for a June 1996 unveiling of the team`s new facility.

  19. Legal and institutional issues

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Leaving aside the natural desire to avoid the difficulties imposed by the enormously complex siting and certification process, a utility might decide to forego adding new capacity because of a variety of legal and institutional disincentives. Some of these are discussed in this chapter. The addition of new lines to support a competitive generating market also raises unique institutional issues. Perhaps the most important of these is the question of who should pay for the necessary capital expenditures. This issue also is discussed in this section

  20. Environmental restoration at the Lawrence Livermore National Laboratory Livermore Site

    International Nuclear Information System (INIS)

    Ziagos, J.P.; Bainer, R.W.; Dresen, M.D.; Hoffman, J.D.

    1992-04-01

    Ground water beneath Lawrence Livermore National Laboratory (LLNL) near Livermore California, contains 19 compounds in concentrations exceeding regulatory standards. These include volatile organic compounds (VOCs), dissolved fuel hydrocarbons, free product gasoline, cadmium, chromium, lead, and tritium. VOCs are the most widespread hazardous materials in the ground water, covering an area of about 1.4 square miles. The other compounds occur sporadically around the site. The LLNL site was added to the National Priorities (Superfund) List in 1987. This paper describes the technology developed at LLNL to remediate soil and ground water contamination. Included in this paper are methods in which site characterization has been aided by using a drilling technique developed at LLNL to evaluate the vertical distribution of VOCs in multiple water-bearing zones in single borehole. The paper also describes the development and implementation of a comprehensive three-step program to investigate and evaluate potential sources of hazardous materials in soil and ground water

  1. Workforce Issues.

    Science.gov (United States)

    1996

    This document consists of four papers presented during a symposium on work force issues moderated by Jan DeJong at the 1996 conference of the Academy of Human Resource Development (AHRD). "Rethinking the Ties that Bind: An Exploratory Study of Employee Development in Utilities in Canada and the United States" (Michael Aherne, David…

  2. Sanskrit Issue.

    Science.gov (United States)

    Miller, Barbara Stoler, Ed.

    1971-01-01

    This issue of "Mahfil" is devoted to Sanskrit literature and contains a note on Sanskrit pronunciation and selections of Sanskrit literature. It also contains articles analyzing and discussing various aspects of the literature, including "Sanskrit Rhetoric and Poetic,""The Creative Role of the Goddess Vac in the…

  3. Bond Issues.

    Science.gov (United States)

    Pollack, Rachel H.

    2000-01-01

    Notes trends toward increased borrowing by colleges and universities and offers guidelines for institutions that are considering issuing bonds to raise money for capital projects. Discussion covers advantages of using bond financing, how use of bonds impacts on traditional fund raising, other cautions and concerns, and some troubling aspects of…

  4. Ethical Issues in Online Education

    Science.gov (United States)

    Anderson, Bill; Simpson, Mary

    2007-01-01

    Teaching at a distance raises ethical issues particular to the distance context. When distance teaching is also online teaching, the situation is even more complex. Online teaching environments amplify the ethical issues faced by instructors and students. Online sites support complex discourses and multiple relationships; they cross physical,…

  5. Theoretical Issues

    Energy Technology Data Exchange (ETDEWEB)

    Marc Vanderhaeghen

    2007-04-01

    The theoretical issues in the interpretation of the precision measurements of the nucleon-to-Delta transition by means of electromagnetic probes are highlighted. The results of these measurements are confronted with the state-of-the-art calculations based on chiral effective-field theories (EFT), lattice QCD, large-Nc relations, perturbative QCD, and QCD-inspired models. The link of the nucleon-to-Delta form factors to generalized parton distributions (GPDs) is also discussed.

  6. Transmission issues

    International Nuclear Information System (INIS)

    Bradford, J.; Wilson, L.; Thon, S.; Millar, N.

    2005-01-01

    This session on transmission issues focused on the role that transmission plays in electricity markets and the importance of getting the market structure right in terms of generation divestiture with buy back contracts, demand side responsive programs, transmission upgrades and long term contracts. The difficulties of distinguishing between market power and scarcity were examined along with some of the complications that ensue if transmission experiences congestion, as exemplified by the August 2003 blackout in eastern North America. The presentations described the best ways to handle transmission issues, and debated whether transmission should be deregulated or follow market forces. Issues of interconnections and reliability of connections were also debated along with the attempt to integrate renewables into the grid. Some presentations identified what new transmission must be built and what must be done to ensure that transmission gets built. The challenges and business opportunities for transmission in Alberta were discussed with reference to plans to invest in new infrastructure, where it is going outside of the province and how it works with other jurisdictions. Manitoba's Conawapa Hydro Project and its 2000 MW tie line to Ontario was also discussed. Some examples of non-optimal use of interconnections in Europe were also discussed in an effort to learn from these mistakes and avoid them in Canada. tabs., figs

  7. Miscellaneous issues

    International Nuclear Information System (INIS)

    2002-01-01

    The New Brunswick Market Design Committee has examined several issues regarding the restructuring of the province's electricity sector. This report presents issues that require guidance for implementation, with particular focus on options available for their resolutions. The issues include: (1) rate principles for stranded offer service (SOS) supply, (2) the ability of contestable customers to return to SOS after having left it, (3) whether loads embedded in distribution systems are eligible to participate in the bilateral contract market, (4) whether generators or suppliers can offer capacity and energy to SOS suppliers in competition with the SOS supplier, and (5) details for the balancing market, including pricing, bidding protocols, settlements and how intermittent power sources can participate in the market. A section on pricing for SOS explains pricing principles, the use of export profits, pricing for SOS capacity, and time of use pricing. The Committee has made recommendations for the electricity system in the province to have an energy imbalance service that can move towards a market in order to develop an efficient and effective service. This report also explains pricing in the balancing market, penalties, and settlements. 7 refs

  8. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  9. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, ∼ 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner

  10. Socioeconomic Site Study Plan: Draft

    International Nuclear Information System (INIS)

    1987-07-01

    Social and economic issues and concerns of the Deak Smith County site area will be evaluated during site characterization. Effects that the area could experience from a repository project include demographic, economic, community service, fiscal, and social impacts. The Socioeconomic Site Study Plan is designed to provide a strategy to assess the potential for those impacts. The Socioeconomic Site Study Plan is structured to provide an overview of the socioeconomic program requirements, objectives, and activities to be conducted during site characterization. This report will describe the study design and its rationale; data collection, management, and reporting; program schedules and milestones; site study organization and management; and quality assurance issues. 43 refs

  11. Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund, Section 104(k); and CERCLA Section 104(d); ‘‘ ‘Discounted Loans’ Under Brownfields Revolving Loan Fund Grants’

    Science.gov (United States)

    Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund, Section 104(k); and CERCLA Section 104(d); ‘‘ ‘Discounted Loans’ Under Brownfields Revolving Loan Fund Grants’`

  12. Liability Issues

    International Nuclear Information System (INIS)

    O’Donoghue, K.

    2016-01-01

    Nuclear liability conventions try to provide a set of rules to govern third party liability. Not all States are parties to one of the existing liability conventions. There are a number of reasons why individual States may choose not to join one of the existing conventions. These include limits of compensation, jurisdiction issues, complexity, cost and definition of damage among others. This paper looks at the existing conventions and identifies some of the main issues in the existing conventions which prevent some States from signing them. The paper attempts to tease out some of the perceived gaps in the existing conventions and give a brief description of the reasons why non-Contracting Parties have difficulty with the provisions of the conventions. The paper recognizes that there has been work done in this area previously by the International Expert Group on Nuclear Liability (INLEX) and others to try to develop the existing frameworks to enhance global adherence by nuclear and non-nuclear States to an effective nuclear liability regime. (author)

  13. Pilot Project to Optimize Superfund-financed Pump and Treat Systems: Summary Report and Lessons Learned

    Science.gov (United States)

    This report summarizes Phase II (site optimization) of the Nationwide Fund-lead Pump and Treat Optimization Project. This phase included conducting Remediation System Evaluations (RSEs) at each of the 20 sites selected in Phase I.

  14. Evaluation of hearings. Results from reviews of the nuclear waste issue in the Swedish site candidate municipalities; Utvaerdering av utfraagningar. Resultat fraan genomlysningar av kaernavfallsfraagan i de svenska foerstudiekommunerna

    Energy Technology Data Exchange (ETDEWEB)

    Drottz-Sjoeberg, B.M. [NTNU, Trondheim (Norway). Dept. of Psychology

    2001-10-01

    towards building a future high level nuclear waste repository. The recently published report by SKB (FUD-K) contributed the main foundation for the program content, which was structured into the two parts of (a) the choice of methodology and (b) the choice of municipalities for the forthcoming site investigations. This report is based on the content of the actual hearings, e.g. questions, answers and comments from the proceedings and group discussions, as well as responses to three questionnaires. The report states that the majority of the participants at the hearings were those already involved, in one way or another, in the municipalities organized work related to the nuclear waste issue. Thus, the hearings did not attract a large number of novices or uninitiated individuals from the general public. The wide scope of considered aspects and the high level of knowledge among the participants were reflected by the questions put to the panel. The questionnaire responses also indicated high initial involvement in the hearings, and that the participants came well prepared to the meetings. The main preparation being studies of available reports and other materials, but also e.g. participation in information seminars or in meetings organized by the municipalities. Their reasons for participation often involved a desire to learn more in relation to specifically formulated questions and / or to gain a better understanding of the work and the overall process. The participants wanted to achieve a result that outlined pros and cons of various methodologies regarding waste management, and which stated the degree of reliability regarding the proposed technological solutions. Furthermore, to reach a substantial level of clarity regarding what can be considered as established facts in contrast to what remains uncertain or problematic. The results indicated that a majority of the participants preferred the proposed KBS-3 method to other alternatives with respect to the construction of a

  15. Site decommissioning management plan

    International Nuclear Information System (INIS)

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff's strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites

  16. Site decommissioning management plan

    Energy Technology Data Exchange (ETDEWEB)

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

  17. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  18. Site characterization report for the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1982-11-01

    This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues

  19. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  20. Site Closure Strategy Model for Creosote Site

    International Nuclear Information System (INIS)

    Coll, F.R.; Gray, D.R.

    2009-01-01

    In conjunction with RCRA site corrective action at an active wood preserving facility, a risk-based site closure strategy was developed and incorporated the performance of a dense non-aqueous phase liquid (DNAPL) source recovery remedy, a monitored natural attenuation (MNA) remedy for dissolved phase groundwater, and institutional controls. Innovative creosote DNAPL source recovery has been undertaken at the Site since 1998. Pooled creosote DNAPL is present 90 feet below ground within a transmissive sand and gravel aquifer with a saturated thickness of approximately 80 feet. The creosote DNAPL source is situated on the property boundary of the site and has generated a 1/2 mile off-site dissolved phase plume, creating significant NAPL management and remedial technology verification issues. To date, over 120,000 gallons of creosote DNAPL have been recovered from the subsurface utilizing a modified circulation well technology. A mass discharge flux protocol was developed to serve as a major performance metrics for the continuation of source removal efforts and to support the application of monitored natural attenuation as an associated remedial technology for groundwater. The mass removal success has supported the MNA remedy for dissolved phase groundwater and the associated development of institutional controls. The enacted site management strategy outlines the current and future risk management activities for the Site and represents an appropriate site closure strategy for the Site. (authors)

  1. Thermal treatment and competing technologies for remediation of MGP (manufactured gas plant) sites

    International Nuclear Information System (INIS)

    McGowan, T.F.; Greer, B.A.; Lawless, M.

    1995-01-01

    More than 1,500 MGP (manufactured gas plant) sites exist throughout the US. Many are contaminated with coal tar from coal-fueled gas works which produced ''town gas'' from the mid-1800s through the 1950s. Virtually all old US cities have such sites. Most are in downtown areas, as they were installed for central distribution of manufactured gas. While a few sites are CERCLA/Superfund, most are not. However, the contaminants and methods used for remediation are similar to those used for Superfund cleanups of coal tar contamination from wood-treating and coke oven facilities. Clean-up of sites is triggered by property transfers and re-development as well as releases to the environment--in particular, via ground water migration. This paper describes recent experience with high capacity/low cost thermal desorption process for this waste. It also reviews competing non-thermal technology, such as bio-treatment, capping, recycling, and dig and haul. Cost data are provided for all technologies, and a case study for thermal treatment is also presented

  2. Proposed plan for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-03-01

    The US Department of Energy (DOE) in compliance with Section 117(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, is releasing the proposed plan for remedial action at the United Nuclear Corporation (UNC) Disposal Site located at the DOE Oak Ridge Operations (ORO) Y-12 Plant, Oak Ridge, Tennessee. The purpose of this document is to present and solicit for comment to the public and all interested parties the ''preferred plan'' to remediate the UNC Disposal Site. However, comments on all alternatives are invited

  3. Legal protection issues with regard to the site selection of a final repository for heat-generating radioactive wastes; Rechtsschutzfragen hinsichtlich der Standortauswahl eines Endlagers fuer waermeentwickelnde radioaktive Abfaelle

    Energy Technology Data Exchange (ETDEWEB)

    Keienburg, Bettina [KUEMMERLEIN Rechtsanwaelte und Notare, Essen (Germany)

    2014-10-15

    The site selection law (hereinafter StandAG) adopted on 23.07 2013 and entirely entered into force on 01.01.2014 shall clarify especially the site selection question of a final repository for highly radioactive waste until the year 2031. For this purpose, the act regulates a comprehensive procedure with multiple public participations and multiple interventions of the legislator. Thus the legislator hopes for an accepted dispute decision on a permanent basis - meaning acceptance. It remains to be seen, if this expectation is realistic. The StandAG and the decisions provided already rise potential for dispute. Added to this is a large number of dispute potential with regard to scouting out in connection with the site selection - despite of legal regulations for scouting out sites and remaining sites- and required authorisation. The potential shall be reported below.

  4. Transitional issues

    International Nuclear Information System (INIS)

    1998-01-01

    This discussion paper, the fifth in the series developed at the IPPSO Market Design Conference, addressed the issue of the need to prevent Ontario Hydro from taking unfair advantage of independent producers and other stakeholders through activities and investments in new power generating capacity in the transitional period leading up to deregulation. The need for controls is predicated on the assumption that the short-term actions and investments of Ontario Hydro could seriously compromise the position of independent generators, and that without such controls the level playing field essential to the operation of a competitive market, does not exist. Various actual and potential actions of Ontario Hydro were discussed, all of which point to the need for strict controls over Ontario Hydro exercising its dominant market power in an unfair way. It was recommended that as a minimum, the provincial government should no longer provide guarantees for Ontario Hydro capital projects, and that Ontario Hydro be instructed to defer any investment on new or returning generating capacity until the new market is in place. Limits could also be placed on Ontario Hydro's marketing efforts to enter into contracts during the transition period, and Ontario Hydro and municipal utilities should be required to keep separate accounts of their commercial preparation, and to settle such accounts separate from ratepayer revenue

  5. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as ''the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as ''the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs

  6. Biota Modeling in EPA's Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

    Energy Technology Data Exchange (ETDEWEB)

    Manning, Karessa L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dolislager, Fredrick G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bellamy, Michael B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-11-01

    The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level tools that set forth Environmental Protection Agency's (EPA) recommended approaches, based upon currently available information with respect to risk assessment, for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has a residential gardening scenario and subsistence farmer exposure scenarios that require modeling of the transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC exposure scenarios. Recent improvements have been made in the biota modeling for these calculators, including newly derived biota intake rates, more comprehensive soil mass loading factors (MLFs), and more comprehensive soil to tissue transfer factors (TFs) for animals and soil to plant transfer factors (BV's). New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

  7. Biota Modeling in EPA's Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

    International Nuclear Information System (INIS)

    Manning, Karessa L.; Dolislager, Fredrick G.; Bellamy, Michael B.

    2016-01-01

    The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level tools that set forth Environmental Protection Agency's (EPA) recommended approaches, based upon currently available information with respect to risk assessment, for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has a residential gardening scenario and subsistence farmer exposure scenarios that require modeling of the transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC exposure scenarios. Recent improvements have been made in the biota modeling for these calculators, including newly derived biota intake rates, more comprehensive soil mass loading factors (MLFs), and more comprehensive soil to tissue transfer factors (TFs) for animals and soil to plant transfer factors (BV's). New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

  8. Superfund record of decision (EPA Region 2): NL Industries, Inc. , Pedricktown, NJ, July 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-08

    This Record of Decision documents the U.S. Environmental Protection Agency's (EPA's) selection of the remedial action for the NL Industries, Inc. site. The remedial action described in this document represents the second of two planned phases, or operable units, at the NL Industries site. This action, designated as Operable Unit One, addresses contaminated ground water, surface water, soils and stream sediments at the site.

  9. Key issues

    International Nuclear Information System (INIS)

    Cook, N.G.W.

    1980-01-01

    Successful modeling of the thermo-mechanical and hydrochemical behavior of radioactive waste repositories in hard rock is possible in principle. Because such predictions lie outside the realm of experience, their adequacy depends entirely upon a thorough understanding of three fundamental questions: an understanding of the chemical and physical processess that determine the behavior of rock and all its complexities; accurate and realistic numerical models of the geologic media within which a repository may be built; and sufficient in-situ data covering the entire geologic region affected by, or effecting the behavior of a repository. At present sufficient is known to be able to identify most of those areas which require further attention. These areas extend all the way from a complete understanding of the chemical and physical processes determining the behavior of rock through to the exploration mapping and testing that must be done during the development of any potential repository. Many of the techniques, laboratory equipment, field instrumentation, and numerical methods needed to accomplish this do not exist at present. Therefore it is necessary to accept that a major investment in scientific research is required to generate this information over the next few years. The spectrum of scientific and engineering activities is wide extending from laboratory measurements through the development of numerical models to the measurement of data in-situ, but there is every prospect that sufficient can be done to resolve these key issues. However, to do so requires overt recognition of the many gaps which exist in our knowledge and abilities today, and of the need to bridge these gaps and of the significant costs involved in doing so

  10. Metropolitan siting: a historical perspective

    International Nuclear Information System (INIS)

    Bunch, D.F.

    1978-09-01

    The paper discusses the development and implementation of the Reactor Site Criteria and particularly the evolving posture of the agency on the subject of metropolitan siting. The review actions on nine sites are described to illustrate the various issues and positions and to clarify at least some of the bases for current practices of the NRC staff

  11. Siting controversial facilities

    International Nuclear Information System (INIS)

    Baird, R.D.; Blacker, P.B.

    1985-01-01

    There is often significant difficulty involved with siting controversial facilities. The social and political problems are frequently far more difficult to resolve than the technical and economic issues. The tendancy for most developing organizations is to address only technical issues in the search for a technically optimal site, to the exclusion of such weighting considerations as the social and political climate associated with potential sites--an approach which often imperils the success of the project. The site selection processes currently suggested is summarized and two contemporary examples of their application are cited. The difference between developers' real objectives and the objectives they have implicitly assumed by adopting the recommended approaches without augmentation are noted. The resulting morass of public opposition is attributed to the failure to consider the needs of individuals and groups who stand to be negatively impacted by the development. A comprehensive implementation strategy which addresses non-technical consideration in parallel with technical ones is presented and evaluated

  12. Fusion facility siting considerations

    International Nuclear Information System (INIS)

    Bussell, G.T.

    1985-01-01

    Inherent in the fusion program's transition from hydrogen devices to commercial power machines is a general increase in the size and scope of succeeding projects. This growth will lead to increased emphasis on safety, environmental impact, and the external effects of fusion in general, and of each new device in particular. A critically important consideration in this regard is site selection. The purpose of this paper is to examine major siting issues that may affect the economics, safety, and environmental impact of fusion

  13. In-situ and on-site technologies; An overview

    Energy Technology Data Exchange (ETDEWEB)

    Freestone, F J [Technical Support Branch, ORD, RREL, U.S. EPA, Edison, New Jersey (US)

    1990-01-01

    A broad analysis of and perspective on the characteristics and measured performance of in-situ and on-site treatment technologies available for remediation of contaminated soils, groundwater and associated debris at hazardous waste sites. Included in the analysis is information from U.S. and European sources. Available data are appended from nine recently completed field demonstrations from the U.S. Environmental Protection Agency (EPA) Superfund Innovative Technology Evaluation (SITE) program. The most frequently applied technology areas appear to be on-site thermal treatment for organics, on-site and in-situ solidification/stabilization technologies for most inorganics and metals, traditional on-site water treatment techniques, and soil vapor extraction for volatile organic compounds. Rapidly developing areas include bioremediation technologies, and concentration technologies. Two of the weakest areas include materials handling for such situations as excavating buried drums and soils with volatiles safely, and performing physical and chemical site characterization using technology-sensitive parameters. An area worthy of international cooperatin is that of performing benchscale screening and treatability studies, including the specification of key parameters needing measurement, techniques for such measurement and for interpretation, storage and retrieval of resulting data. We are in the process of evaluating existing treatability study data on soils and debris, and will be installing that data onto an on-line information system available to the public world-wide. (AB) 10 refs.

  14. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels.

  15. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    International Nuclear Information System (INIS)

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels

  16. Orphan radon daughters at Denver Radium site

    International Nuclear Information System (INIS)

    Holub, R.F.; Droullard, R.F.; Davis, T.H.

    1992-01-01

    During 18 mo of sampling airborne radioactively at a National Priority List (open-quotes Superfundclose quotes) site in metroPOlitan Denver, Bureau of mines personnel discovered radon daughters that are not supported by the parent radon gas. We refer to them as open-quotes orphanclose quotes daughters because the parent, radon, is not present in sufficient concentration to support the measured daughter products. Measurements of the open-quotes orphanclose quotes daughters were made continuously, using the Bureau-developed radon and working-level (radon-daughter) monitors. The data showed high equilibrium ratios, ranging from 0.7 to 3.5, for long periods of time. Repeated, high-volume, 15-min grab samples were made, using the modified Tsivoglou method, to measure radon daughters, to which thoron daughters contributed 26 ± 12%. On average 28 ± 6% of the particulate activity was contributed by thoron daughters. Most samples were mixtures in which the 218 Po concentration was lower than that of 214 Pb and 214 Bi, in agreement with the high-equilibrium factors obtained from the continuous sampling data. In view of the short half-life of radon progeny, we conclude that the source of the orphan daughters is not far from the Superfund sites. The mechanism of this phenomenon is not understood at this time, but we will discuss its possible significance in evaluating population doses

  17. Thermal treatment and non-thermal technologies for remediation of manufactured gas plant sites

    International Nuclear Information System (INIS)

    McGowan, T.F.; Greer, B.A.; Lawless, M.

    1996-01-01

    More than 1,500 manufactured gas plant (MGP) sites exist throughout the US. Many are contaminated with coal tar from coal-fueled gas works which produced town gas from the mid-1800s through the 1950s. Virtually all old US cities have such sites. Most are in downtown areas as they were installed for central distribution of manufactured gas. While a few sites are CERCLA/Superfund, most are not. However, the contaminants and methods used for remediation are similar to those used for Superfund clean-ups of coal tar contamination from wood-treating and coke oven facilities. Clean-up of sites is triggered by regulatory pressure, property transfers and re-development as well as releases to the environment--in particular, via groundwater migration. Due to utility de-regulation, site clean-ups may also be triggered by sale of a utility or of a specific utility site to other utilities. Utilities have used two approaches in dealing with their MGP sites. The first is do nothing and hope for the best. History suggests that, sooner or later, these sites become a bigger problem via a release, citizen lawsuit or regulatory/public service commission intervention. The second, far better approach is to define the problem now and make plans /for waste treatment or immobilization. This paper describes recent experience with a high capacity/low cost thermal desorption process for this waste and reviews non-thermal technology, such as bio-treatment, capping, recycling, and dig and haul. Cost data are provided for all technologies, and a case study for thermal treatment is also presented

  18. Siting nuclear power plants

    International Nuclear Information System (INIS)

    Yellin, J.; Joskow, P.L.

    1980-01-01

    The first edition of this journal is devoted to the policies and problems of siting nuclear power plants and the question of how far commercial reactors should be placed from urban areas. The article is divided into four major siting issues: policies, risk evaluation, accident consequences, and economic and physical constraints. One concern is how to treat currently operating reactors and those under construction that were established under less-stringent criteria if siting is to be used as a way to limit the consequences of accidents. Mehanical cost-benefit analyses are not as appropriate as the systematic use of empirical observations in assessing the values involved. Stricter siting rules are justified because (1) opposition because of safety is growing: (2) remote siting will make the industry more stable; (3) the conflict is eliminated between regulatory policies and the probability basis for nuclear insurance; and (4) joint ownership of utilities and power-pooling are increasing. 227 references, 7 tables

  19. Superfund Reauthorization 1994: DoD’s Opportunity to Clean Up Its Hazardous Waste Act

    Science.gov (United States)

    1994-04-01

    doctrines of waiver, estoppel and laches are relevant and admissible on the issue of allocation of liability under a contribution plan); Westwood...injunctive relief, estoppel and unclean hands to proceed to trial); United States v. Dickerson, 640 F. Supp. 448, 451 (D. Md. 1986) (court allowed estoppel

  20. SITE demonstration of the Dynaphore/Forager Sponge technology to remove dissolved metals from contaminated groundwater

    Energy Technology Data Exchange (ETDEWEB)

    Esposito, C.R. [Environmental Protection Agency, Edison, NJ (United States); Vaccaro, G. [Science Applications International Corp., Hackensack, NJ (United States)

    1995-10-01

    A Superfund Innovative Technology Evaluation (SITE) demonstration was conducted of the Dynaphore/Forager Sponge technology during the week of April 3, 1994 at the N.L. Industries Superfund Site in Pedricktown, New Jersey. The Forager Sponge is an open-celled cellulose sponge incorporating an amine-containing chelating polymer that selectively absorbs dissolved heavy metals in both cationic and anionic states. This technology is a volume reduction technology in which heavy metal contaminants from an aqueous medium are concentrated into a smaller volume for facilitated disposal. The developer states that the technology can be used to remove heavy metals from a wide variety of aqueous media, such as groundwater, surface waters and process waters. The sponge matrix can be directly disposed, or regenerated with chemical solutions. For this demonstration the sponge was set up as a mobile pump-and-treat system which treated groundwater contaminated with heavy metals. The demonstration focused on the system`s ability to remove lead, cadmium, chromium and copper from the contaminated groundwater over a continuous 72-hour test. The removal of heavy metals proceeded in the presence of significantly higher concentrations of innocuous cations such as calcium, magnesium, sodium, potassium and aluminum.

  1. Site decontamination

    International Nuclear Information System (INIS)

    Bicker, A.E.

    1981-01-01

    Among the several DOE sites that have been radiologically decontaminated under the auspices of the Nevada Operations Office are three whose physical characteristics are unique. These are the Tatum Dome Test Site (TDTS) near Hattiesburg, Mississippi; a location of mountainous terrain (Pahute Mesa) on the Nevada Test Site; and the GNOME site near Carlsbad, New Mexico. In each case the contamination, the terrain, and the climate conditions were different. This presentation includes a brief description of each site, the methods used to perform radiological surveys, the logistics required to support the decontamination (including health physics and sample analysis), and the specific techniques used to reduce or remove the contamination

  2. Superfund TIO videos. Set C. Treatment technologies: Incineration. Part 12. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape discusses incineration performance factors, such as destruction removal efficiency, and types of incineration, such as rotary kiln, fluidized bed, and infrared. Procedural considerations including mobilization/demobilization, site preparation, set up of utilities and support equipment, and monitoring are presented

  3. Site organization and site arrangement

    International Nuclear Information System (INIS)

    Boissonnet, B.; Macqueron, J.F.

    1976-01-01

    The present paper deals with criteria for the choice of a production unit or power plant site, the organization and development of a site in terms of its particular characteristics and takes into account personnel considerations in site organizations as well as the problem of integrating the architecture into the environment. (RW) [de

  4. Remotely operated excavator needs assessment/site visit summary

    Energy Technology Data Exchange (ETDEWEB)

    Straub, J.; Haller, S.; Worsley, R. [Westinghouse Environmental Management Co. of Ohio, Cincinnati, OH (United States); King, M. [THETA Technology Inc. (United States)

    1992-12-02

    The Uranium in Soils Integrated Demonstration requested an assessment of soil excavation needs relative to soil remediation. The following list identifies the DOE sites assessed: Mound Laboratory, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant, Nevada Test Site, Lawrence Livermore National Laboratory, Rocky Flats Plant, Los Alamos National Laboratory, Sandia National Laboratory, Idaho National Engineering Laboratory, Hanford Site, and Fernald Site. The reviewed sites fall into one or more of the following three categories: production, EPA National Priorities List, or CERCLA (superfund) designation. Only three of the sites appear to have the need for a remotely operated excavator rope. Hanford and Idaho Falls have areas of high-level radioactive contamination either buried or in/under buildings. The Fernald site has a need for remote operated equipment of different types. It is their feeling that remote equipment can be used to remove the health dangers to humans by removing them from the area. Most interviewees stated that characterization technologies needs are more immediate concern over excavation. In addition, the sites do not have similar geographic conditions which would aid in the development of a generic precision excavator. The sites visited were not ready to utilize or provide the required design information necessary to draft a performance specification. This creates a strong case against the development of one type of ROPE for use at these sites. Assuming soil characterization technology/methodology is improved sufficiently to allow accurate and real time field characterization then development of a precision excavator might be pursued based on FEMP needs, since the FEMP`s sole scope of work is remediation. The excavator could then be used/tested and then later modified for other sites as warranted.

  5. Superfund Record of Decision (EPA Region 2): Glen Ridge Radium, NJ. (First Remedial Action), June 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Glen Ridge Radium site is in the Borough of Glen Ridge and the town of East Orange in Essex County, New Jersey. The soil at the site is contaminated to varying degrees with radioactive waste materials suspected to have originated from radium processing or utilization facilities located nearby during the early 1900s. Temporary radon ventilation systems and gamma-radiation shielding have been installed and maintained by EPA and the State to reduce indoor exposures. The primary contaminant of concern affecting the soil and structures in radium 226 which delays to radon gas. The selected remedial action includes excavation of approximately 41,000 cu yd of highly contaminated soil and an unspecified amount of debris followed by offsite disposal; installation and maintenance of indoor engineering controls at less contaminated properties; environmental monitoring to ensure remedy effectiveness; and continuation of a treatment technology study for future actions

  6. Radioactive waste storage issues

    International Nuclear Information System (INIS)

    Kunz, D.E.

    1994-01-01

    In the United States we generate greater than 500 million tons of toxic waste per year which pose a threat to human health and the environment. Some of the most toxic of these wastes are those that are radioactively contaminated. This thesis explores the need for permanent disposal facilities to isolate radioactive waste materials that are being stored temporarily, and therefore potentially unsafely, at generating facilities. Because of current controversies involving the interstate transfer of toxic waste, more states are restricting the flow of wastes into - their borders with the resultant outcome of requiring the management (storage and disposal) of wastes generated solely within a state's boundary to remain there. The purpose of this project is to study nuclear waste storage issues and public perceptions of this important matter. Temporary storage at generating facilities is a cause for safety concerns and underscores, the need for the opening of permanent disposal sites. Political controversies and public concern are forcing states to look within their own borders to find solutions to this difficult problem. Permanent disposal or retrievable storage for radioactive waste may become a necessity in the near future in Colorado. Suitable areas that could support - a nuclear storage/disposal site need to be explored to make certain the health, safety and environment of our citizens now, and that of future generations, will be protected

  7. Coal mine site reclamation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-02-15

    Coal mine sites can have significant effects on local environments. In addition to the physical disruption of land forms and ecosystems, mining can also leave behind a legacy of secondary detrimental effects due to leaching of acid and trace elements from discarded materials. This report looks at the remediation of both deep mine and opencast mine sites, covering reclamation methods, back-filling issues, drainage and restoration. Examples of national variations in the applicable legislation and in the definition of rehabilitation are compared. Ultimately, mine site rehabilitation should return sites to conditions where land forms, soils, hydrology, and flora and fauna are self-sustaining and compatible with surrounding land uses. Case studies are given to show what can be achieved and how some landscapes can actually be improved as a result of mining activity.

  8. Site operations

    International Nuclear Information System (INIS)

    House, W.B.; Ebenhack, D.G.

    1989-01-01

    This chapter is a discussion of the management and operations practices used at the Barnwell Waste Management Facility in Barnwell, SC. The following topics are discussed: (1) Waste receiving and inspection, including manifest and certificates of compliance, radiological surveys, disposition of nonconforming items, and decontamination and disposition of secondary waste streams; (2) Waste disposal, including Title 10 CFR 61 requirements, disposal area evaluations, shipment offloading, container emplacement, and radiation protection; (3) Trench closure, including trench backfilling, trench capping, and permanent markers; (4) Site maintenance and stabilization, including trench maintenance, surface water management, and site closure activities; (5) Site monitoring programs, including operational monitoring, and environmental monitoring program; (6) Personnel training and qualifications, including basic training program, safety training program, special skills training, and physical qualifications; (7) Records management, including waste records, personnel training records, personnel dosimetry records, site monitoring records, trench qualification and construction records, and site drawings and stabilization records; (8) Site security; (9) Emergency response plans; and (10) Quality assurance

  9. Request for information related to the resolution of generic issue 130, ''Essential service water system failures at multi-unit sites,'' pursuant to 10 CFR 50.54(f) - Generic Letter 91-13

    International Nuclear Information System (INIS)

    Partlow, J.G.

    1993-01-01

    The essential service water system (ESWS) is important in maintaining plant safety during power operation, shutdown, and accident conditions. As part of the Nuclear Regulatory Commission's (NRC) evaluation of loss of essential service water (LOSW), extensive analyses of this issue were performed at the Brookhaven National Laboratory (BNL). In addition, the NRC staff performed a regulatory analysis to evaluate the safety benefits and implementation costs associated with various equipment and the administrative-type improvements that were considered. These analyses assume that the flushing and flow testing provisions of Generic Letter (GL) 89-13, ''Service Water System Problems Affecting Safety-Related Equipment,'' will be applied to the crosstie lines as part of addressees' implementation of the resolution of GI-51, ''Improving the Reliability of Open-Cycle Service Water Systems'' (GL 89-13 and Supplement 1). On the basis of results of these evaluations of this generic safety issue, the NRC staff has concluded that the following administrative-type improvements would significantly enhance the availability of the ESWS in affected plants, and their implementation is warranted in view of the safety benefit to be derived and the cost of implementation: technical specification (TS) changes contained in Enclosure 1 to enhance the availability of the ESWS as applied to the design configuration of affected plants; and improvement of emergency procedures for a LOSW using existing design features, specifically: (a) operating and maintaining high-pressure injection (HPI) pump integrity in the event of loss of reactor coolant pump (RCP) seals as a result of ESWS failure, and (b) testing and manipulating the ESWS crosstie between the units during a LOSW accident

  10. Environmental compliance at U.S. Department of Energy FUSRAP (Formerly Utilized Sites Remedial Action Program) sites

    International Nuclear Information System (INIS)

    Liedle, S.D.; Clemens, B.W.

    1988-01-01

    With the promulgation of the Superfund Amendments and Reauthorization Act (SARA), federal facilities were required to comply with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) in the same manner as any non-government entity. This presented challenges for the Department of Energy (DOE) and other federal agencies involved in remedial action work because there are many requirements under SARA that overlap other laws requiring DOE compliance, e.g., the National Environmental Policy Act (NEPA). This paper outlines the options developed to comply with CERCLA and NEPA as part of active, multi-site remedial action program. The program, the Formerly Utilized Sites Remedial Action Program (FUSRAP), was developed to identify, clean up, or control sites containing residual radioactive or chemical contamination as a result of the nation's early development of nuclear power. During the Manhattan Project, uranium was extracted from ores and resulted in mill concentrates, purified metals, and waste products that were transported for use or disposal at other locations. Figure 1 shows the steps for producing uranium metal during the Manhattan Project. As a result of these activities materials, equipment, buildings, and land became contaminated, primarily with naturally occurring radionuclides. Currently, FUSRAP includes 29 sites; three are on the Environmental Protection Agency's (EPA's) National Priorities List (NPL) of hazardous waste sites

  11. Implementing ‘Site BIM’

    DEFF Research Database (Denmark)

    Davies, Richard; Harty, Chris

    2013-01-01

    Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation...... of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM...

  12. Ethical Issues in Using Children's Blood Lead Levels as a Remedial Action Objective

    Science.gov (United States)

    Evans, Emily Lorraine

    2011-01-01

    The Environmental Protection Agency measures the success or failure of Superfund site remediation efforts against remedial action objectives (RAOs). RAOs are frequently based on environmental contaminant concentrations, but with lead exposure, blood lead levels from the population at risk are often used. Although childhood lead screening is an important public health tool, an RAO based on child blood lead levels raises ethical concerns: public health efforts that are more reactive than preventive, a blood lead standard (10 μg/dL) that may not be fully protective, the use of a measure whose validity and reliability may be easily compromised, and exacerbation of environmental injustice and systematic disadvantages. The example of Bunker Hill mine, Kellogg, Idaho, allowed an examination of these ethical concerns. PMID:21836120

  13. Third party Superfund lawsuit defense influenced by the choice of remediation method

    International Nuclear Information System (INIS)

    Haddad, B.I.; Parish, G.B.

    1994-01-01

    Paper Company A was sued in a third party action suit initiated by a local utility who was a potential responsible party (PRP) to a contaminated site regulated under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) program. In addition to Paper Company A, other parties to the third party suit included Paper Company B and Contractor C, a demolition contractor/waste hauler. Other PRPs included land owners where the contaminated debris was dumped, Mr. and Mrs. D. Based on background information, Paper Company A dumped coal ash, off quality feed stock, wood and trash north of the D-property. Paper Company B admitted dumping material north of the D-property. Samples of industrial sludges on the D-property had properties characteristic of the Paper Company B's sludges. Paper Company B dumped ash, chromium contaminated gypsum sludge and other waste. The utility company dumped ash on the D-property. Contractor C hauled demolition debris to the D property. A third PRP, Company E was the original owner of the buildings that were demolished. This PRP settled with the EPA as part of a bankruptcy settlement. The hazardous substances encountered at the site included PCBs, chromium and lead in the coal ash, demolition debris and industrial sludges. Disposal of material containing hazardous substances resulted in PCB contaminated debris and sediment, and chromium and lead contamination in the sediment, soil and groundwater

  14. Remedial design of the Fultz Landfill Site, Byesville, Ohio

    International Nuclear Information System (INIS)

    Rajaram, V.; Riesing, R.; Bloom, T.

    1994-01-01

    The Fultz Landfill Superfund (Fultz) site is a 30-acre hazardous waste landfill located near Byesville, Ohio. The site is approximately 75 miles east of Columbus and 3 miles southwest of Cambridge, the largest city in Guernsey County, Ohio. The landfill is situated on the north slope of a ridge that overlies abandoned coal mines in the Upper Freeport Coal seam. The north half of the landfill lies in an unreclaimed strip mine in the Upper Freeport Coal seam, where saturated portions of surface mine spoils and natural soils form the ''shallow aquifer''. The south half of the landfill lies 40 to 50 feet (ft.) above an abandoned, flooded deep mine in the same coal seam. The flooded deep mine forms an aquifer referred to as the ''coal mine aquifer''. This paper presents the results of design studies completed by PRC Environmental Management, Inc. (PRC), during 1993, and the remedial design (RD) of the components specified by the US Environmental Protection Agency (EPA) Record of Decision (ROD) for the Fultz site (EPA 1991). The remedy specified in the ROD includes a multilayer landfill cap that is compliant with Resource Conservation and Recovery Act (RCRA) Subtitle C guidelines, a leachate collection and groundwater extraction and treatment system, and stabilizing mine voids underlying the southern portion of the site. Vinyl chloride is the only contaminant exceeding a maximum contaminant limit (MCL) in the coal mine aquifer

  15. Getting the job done: Resolving state-federal conflicts in Superfund

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.; Silver, D.

    1998-12-31

    The American system of federalism creates frequent opportunities for clashes between state and federal environmental regulators.State and federal environmental laws overlap but are not easily reconciled. Most federal environmental law provides no clear answer as to how to reconcile differing mandates of state and federal environmental regulators. In this article, they will examine these state-federal conflicts as they played out in 1994 in the cleanup of contaminated sites in the state of Washington. This article describes the way a regional office of the Environmental Protection Agency and the state`s Department of Ecology developed a novel approach to managing the essential tension between overlapping state and federal cleanup laws.

  16. Site development

    International Nuclear Information System (INIS)

    Noack, J.

    1975-01-01

    The subject of this paper is a general view over all necessary considerations to develop the site after it has been chosen and before starting with the construction of a nuclear power plant. (orig./RW) [de

  17. Site selection

    International Nuclear Information System (INIS)

    Olsen, C.W.

    1983-07-01

    The conditions and criteria for selecting a site for a nuclear weapons test at the Nevada Test Site are summarized. Factors considered are: (1) scheduling of drill rigs, (2) scheduling of site preparation (dirt work, auger hole, surface casing, cementing), (3) schedule of event (when are drill hole data needed), (4) depth range of proposed W.P., (5) geologic structure (faults, Pz contact, etc.), (6) stratigraphy (alluvium, location of Grouse Canyon Tuff, etc.), (7) material properties (particularly montmorillonite and CO 2 content), (8) water table depth, (9) potential drilling problems (caving), (10) adjacent collapse craters and chimneys, (11) adjacent expended but uncollapsed sites, (12) adjacent post-shot or other small diameter holes, (13) adjacent stockpile emplacement holes, (14) adjacent planned events (including LANL), (15) projected needs of Test Program for various DOB's and operational separations, and (16) optimal use of NTS real estate

  18. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale

  19. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  20. Challenges in Obtaining Property Access: The FUSRAP Maywood Site Experience - 13433

    Energy Technology Data Exchange (ETDEWEB)

    Kollar, William [Shaw Environmental, Inc., 100 West Hunter Avenue, Maywood, NJ 07607 (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the US government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. Many of these sites are not owned by the federal government and therefore require owner permission to enter. The experience in pursuing such access at the FUSRAP Maywood Superfund Site (the Maywood Site or the Site) in Bergen County, New Jersey, is extensive. Since the US Army Corps of Engineers (the Corps) assumed responsibility for the Maywood Site from the US Department of Energy in 1997, at least 186 separate property access agreements (known in FUSRAP as a Real Estate Right-of- Entry or ROE) have been executed between the Corps and approximately 55 different land owners and tenant occupants at the Maywood Site (agreement renewals with the same owners over time account for the difference). Maywood's experience during the Corps' tenure, reflected here in three case studies of representative property access efforts, offers some lessons and best practices that may apply to other remedial programs. While the Site Community Relations Manager (the author of this paper) managed the property access task, multi-disciplinary support from across the project was also critical to success in this endeavor. (authors)