  1. Superfund tio videos: Set A. Overview of superfund, response activities and responsibilities, site discovery, notification, and evaluation. Part 1. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into three sections. Section 1 discusses the development and framework of CERCLA and the Superfund Program and outlines the implementing rules that guide Superfund site cleanups. The Superfund response actions - remedial, removal, and enforcement - are reviewed. Section 2 outlines On-Scene Coordinator's (OSC) and Remedial Project Manager's (RPM) roles and responsibilities in Superfund removal, remedial, and enforcement activities. The other players involved in Superfund response activities also are identified. Section 3 describes how EPA learns of potential Superfund sites and lists the authorities that determine the requirements for site discovery. The procedures used to prioritize the sites and to identify and select sites for remediation are discussed

  2. Superfund Removal Site Points, Region 9, 2012, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of CERCLA (Superfund) Removal sites. CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act)...

  3. Regulatory compliance issues related to the White Oak Creek Embayment time-critical removal action

    International Nuclear Information System (INIS)

    Leslie, M.; Kimmel, B.L.

    1992-01-01

    In September 1990, Martin Marietta Energy Systems (Energy Systems) discovered high levels of Cesium-137 present in surface sediments at the mouth of White Oak Creek (WOC) Embayment. WOC receives the majority of surface water drainage from Oak Ridge National Laboratory. Following this discovery, the Department of Energy (DOE) and Energy Systems pursued stabilizing sediment migration under provisions of the National Contingency Plan (NCP) Section 300.400 et. seq. as a time-critical removal action. However, significant uncertainty exists concerning the applicability of NCP procedural requirements designed for conducting US EPA-led, Superfund-financed response actions, because NCP Subpart K dealing with response actions at federal facilities has not been promulgated. In addition, relatively new guidance exists from DOE concerning National Environmental Policy Act documentation requirements for categorical exclusions associated with conducting removal actions at DOE facilities. A proactive approach was taken to identify issues and involve appropriate state and federal regulatory agencies. This approach required achieving consensus among all involved parties and identification of all applicable or relevant and appropriate regulatory requirements related to the removal action. As a result, this project forms a framework for conducting future time-critical removal actions at federal facilities

  4. 75 FR 49414 - Cooperative Agreements and Superfund State Contracts for Superfund Response Actions

    Science.gov (United States)

    2010-08-13

    ...-0276. FOR FURTHER INFORMATION CONTACT: Angelo Carasea, Assessment and Remediation Division, Office of Superfund Remediation and Technology Innovation, (5204P), Environmental Protection Agency, 1200 Pennsylvania... funds to a State, political subdivision, or Indian Tribe that assumes responsibility as the lead or...

  5. Case studies of community relations on DOE's Formerly Utilized Sites Remedial Action Program as models for Superfund sites

    International Nuclear Information System (INIS)

    Plant, S.W.; Adler, D.G.

    1995-01-01

    Ever since the US Department of Energy (DOE) created its Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974, there has been a community relations program. The community relations effort has grown as FUSRAP has grown. With 20 of 46 sites now cleaned up, considerable experience in working with FUSRAP stakeholders has been gained. Why not share that experience with others who labor on the Superfund sites? Many similarities exist between the Superfund sites and FUSRAP. FUSRAP is a large, multiple-site environmental restoration program. The challenges range from small sites requiring remedial actions measurable in weeks to major sites requiring the full remedial investigation/feasibility study process. The numerous Superfund sites throughout the United States offer the same diversity, both geographically and technically. But before DOE offers FUSRAP's community relations experience as a model, it needs to make clear that this will be a realistic model. As experiences are shared, DOE will certainly speak of the efforts that achieved its goals. But many of the problems that DOE encountered along the way will also be related. FUSRAP relies on a variety of one- and two-way communication techniques for involving stakeholders in the DOE decision-making process. Some of the techniques and experiences from the case studies are presented

  6. Superfund at work: Hazardous waste cleanup efforts nationwide, spring 1993 (Radium Chemical Site profile, Queens, New York)

    International Nuclear Information System (INIS)

    1993-01-01

    The Radium Chemical hazardous waste site in Queens, New York was contaminated with radium, posing a grave potential threat to the community. The US Environmental Protection Agency (EPA) used the Superfund program to design a long-term cleanup for the site using input from citizens and the business community. Superfund staff: Mobilized a quick cleanup action to remove 10,000 small containers of radium; Developed a streamlined approach to long-term cleanup; Secured the site to reduce the possibility of radiation exposure to the local residents; Cooperated with the community to design a well-organized emergency response plan; and Educated local citizens about site hazards, incorporating community concerns into the cleanup process. The Radium Chemical site is a clear example of EPA's effective management and problem-solving strategies at Superfund sites

  7. 78 FR 729 - Ellman Battery Superfund Site; Orlando, Orange County, FL; Notice of Settlement

    Science.gov (United States)

    2013-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9767-6; CERCLA-04-2012-3780] Ellman Battery Superfund Site; Orlando, Orange County, FL; Notice of Settlement AGENCY: Environmental Protection Agency (EPA). ACTION... Action at the Ellman Battery Superfund Site located in Orlando, Orange County, Florida. DATES: The Agency...

  8. Superfund Sites

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This layer represents active Superfund Sites published by the Environmental Protection Agency (EPA). These data were extracted from the Superfund Enterprise...

  9. Ensuring the adequacy of cost share provisions in superfund state contracts. Directive

    International Nuclear Information System (INIS)

    1993-01-01

    The memorandum requests regional offices to re-examine existing Superfund State Contracts (SSCs) for Fund-financed remedial actions to verify that they adequately reflect incurred and projected remedial action costs

  10. Superfund impasse

    International Nuclear Information System (INIS)

    Dowd, R.M.

    1988-01-01

    EPA recently reported to Congress on the status of the Superfund program. A review of the report reveals that Superfund is a costly, slow-moving juggernaut that consumes an ever-growing share of resources and threatens to overwhelm other, more pressing environmental issues. EPA was given a broad mandate to clean up hazardous-waste sites when Congress enacted the Comprehensive Environmental Response. Compensation, and Liability Act in 1980 and established a $1.6 billion appropriation for a Superfund. In 1986 Congress extended the program for another five years and added $8.5 billion to complete the job-an overly optimistic estimate, as we shall see. Superfund is a huge program; the inventory of potentially hazardous waste sites is large and growing quickly. By the end of fiscal year 1987, EPA's inventory listed 27,571 hazardous-waste sites,and this number is increasing steadily at a rate of about 2500 each year. The General Accounting Office suggests that there may be as many as 150,000 such sites

  11. DECISION ANALYSIS OF INCINERATION COSTS IN SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This study examines the decision-making process of the remedial design (RD) phase of on-site incineration projects conducted at Superfund sites. Decisions made during RD affect the cost and schedule of remedial action (RA). Decision analysis techniques are used to determine the...

  12. Superfund record of decision (EPA Region 7): Cherokee County Superfund Site, Cherokee County, KS, July 29, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The decision document presents the selected remedial action for the mining wastes at Operable Unit No. 07 of the Galena Subsite, which is part of the Cherokee County Superfund Site in Cherokee County, Kansas. The selected remedy includes actions for residential soils impacted by mining wastes and includes: Excavation and disposal of residential soils impacted by mining wastes; Health education for the general community and medical professionals; Institutional controls to guide future development in residential areas impacted by mining wastes; Treatability studies to evaluate the effectiveness of phosphate stabilization as a future alternative; and Operation and maintenance of all remedy aspects including, but not limited to, health education, institutional controls, and long-term monitoring.

  13. Remediation of the Wells G & H Superfund Site, Woburn, Massachusetts.

    Science.gov (United States)

    Bair, E Scott; Metheny, Maura A

    2002-01-01

    Remediation of ground water and soil contamination at the Wells G & H Superfund Site, Woburn, Massachusetts, uses technologies that reflect differences in hydrogeologic settings, concentrations of volatile organic compounds (VOCs), and costs of treatment. The poorly permeable glacial materials that overlie fractured bedrock at the W.R. Grace property necessitate use of closely spaced recovery wells. Contaminated ground water is treated with hydrogen peroxide and ultraviolet (UV) oxidation. At UniFirst, a deep well completed in fractured bedrock removes contaminated ground water, which is treated by hydrogen peroxide, UV oxidation, and granular activated carbon (GAC). The remediation system at Wildwood integrates air sparging, soil-vapor extraction, and ground water pumping. Air stripping and GAC are used to treat contaminated water; GAC is used to treat contaminated air. New England Plastics (NEP) uses air sparging and soil-vapor extraction to remove VOCs from the unsaturated zone and shallow ground water. Contaminated air and water are treated using separate GAC systems. After nine years of operation at W.R. Grace and UniFirst, 30 and 786 kg, respectively, of VOCs have been removed. In three years of operation, 866 kg of VOCs have been removed at Wildwood. In 15 months of operation, 36 kg of VOCs were removed at NEP. Characterization work continues at the Olympia Nominee Trust, Whitney Barrel, Murphy Waste Oil, and Aberjona Auto Parts properties. Risk assessments are being finalized that address heavy metals in the floodplain sediments along the Aberjona River that are mobilized from the Industri-Plex Superfund Site located a few miles upstream.

  14. Superfund fact sheet: The remedial program. Fact sheet

    International Nuclear Information System (INIS)

    1992-09-01

    The fact sheet describes what various actions the EPA can take to clean up hazardous wastes sites. Explanations of how the criteria for environmental and public health risk assessment are determined and the role of state and local governments in site remediation are given. The fact sheet is one in a series providing reference information about Superfund issues and is intended for readers with no formal scientific training

  15. The Removal Action Work Plan for CPP-603A Basin Facility

    International Nuclear Information System (INIS)

    B. T. Richards

    2006-01-01

    This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center

  16. Superfund Query

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Superfund Query allows users to retrieve data from the Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) database.

  17. Key Principles of Superfund Remedy Selection

    Science.gov (United States)

    Guidance on the primary considerations of remedy selection which are universally applicable at Superfund sites. Key guidance here include: Rules of Thumb for Superfund Remedy Selection and Role of the Baseline Risk Assessment.

  18. Stigma: The Psychology and Economics of Superfund (2004)

    Science.gov (United States)

    Study documents the long-term impacts of Superfund cleanup on property values in communities neighboring prominent Superfund sites, examining the sale prices of nearly 35,000 homes for up to a thirty-year period near six very large Superfund sites.

  19. 75 FR 38100 - National Institute of Environmental Health Sciences Superfund Hazardous Substance Research and...

    Science.gov (United States)

    2010-07-01

    ...- traditional communication methods to make the significance and applicability of SRP-funded research... and Social Sciences Research, and National Institute of Biomedical Imaging and Bioengineering. [cir... Superfund Hazardous Substance Research and Training Program Strategic Plan; Request for Comments ACTION...

  20. CERCLA and RCRA requirements affecting cleanup of a hazardous waste management unit at a Superfund site: A case study

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1995-03-01

    The Fernald Environmental Management Project (FEMP) attempted to address both RCRA and CERCLA requirements at the fire training facility (FTF) by integrating a CERCLA removal action work plan with a RCRA closure plan. While the regulatory agencies involved with the FTF cleanup agreed the integrated document was a good idea, implementation proved complicated, owing to disposition of clean debris from a Superfund site, treatment of contaminated media, duration of cleanup activities, and cleanup certification. While all the complications have not been resolved, solutions to all have been proposed to Ohio EPA and U.S. EPA. Both agencies have worked closely with FEMP to find the most effective fulfillment of RCRA and CERCLA requirements

  1. Fifteen years of Superfund at South Valley: Reengineering required

    International Nuclear Information System (INIS)

    Cormier, J.; Horak, F.

    1995-01-01

    It is no surprise to many of Superfund's practitioners that the law and its application are flawed. The South Valley Superfund Site in Albuquerque, New Mexico has not escaped Superfund's problems. The problems and issues arising out of the South Valley Superfund site have spurred the desire to seek a better way to administer and manage cleanup. This new method applies organizational and role changes that bring Superfund closer to an efficient business-like entity. This ''Reengineered'' Superfund strives for reorganization, contractor reduction, improved communication, reporting reduction, and teaming. In addition, modifications are made to the roles of regulators, potentially responsible parties (PRPs), and the public. Today the site encompasses roughly one square mile in area, includes six identified contaminant sources, and deals with solvent and petroleum by-product contamination

  2. Stakeholder views of superfund sites

    International Nuclear Information System (INIS)

    English, M.R.

    1992-01-01

    Nearly ten years have passed since the enactment of the federal Comprehensive Response, Compensation, and Liability Act (CERCLA), usually referred to as open-quotes Superfundclose quotes. Nearly four years have passed since CERCLA's major overhaul through the Superfund Amendments and Reauthorization Act (SARA). Although much still remains to be done under Superfund, there is now enough experience to assess how effectively it is working. A study being undertaken by the University of Tennessee's Waste Management Research and Education Institute will supply a portion of that assessment. The study was completed in the fall of 1990. Our study examines two related issues: the resources that will be needed in the coming years to fulfill the mandate of Superfund and other hazardous waste remediation programs, and the site-level experience to date in implementing CERCLA and SARA. This chapter discusses only the open-quotes site-level experienceclose quotes effort, and only its methodological approach. The purpose of the open-quotes site-level experienceclose quotes effort is to explore what counts as a open-quotes successfulclose quotes site in the eyes of different stakeholders in a Superfund cleanup - e.g., the affected community, the potentially responsible parties (PRPs), state and local officials, and the US Environmental Protection Agency (EPA)

  3. Superfund Site Information

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes a number of individual data sets related to site-specific information for Superfund, which is governed under the Comprehensive Environmental...

  4. Chromosomal aberrations in Sigmodon hispidus from a Superfund site

    International Nuclear Information System (INIS)

    Bowers, B.; McBee, K.; Lochmiller, R.; Burks, S.; Qualls, C.

    1995-01-01

    Cotton rats (Sigmodon hispidus) were collected from an EPA Superfund site located on an abandoned oil refinery. Three trapping grids were located on the refinery and three similar grids were located at uncontaminated localities which served as reference sites. Bone marrow metaphase chromosome preparations were examined for chromosomal damage. For each individual, 50 cells were scored for six classes of chromosomal lesions. For the fall 1991 trapping period, mean number of aberrant cells per individual was 2.33, 0.85, and 1.50 for the three Superfund grids., Mean number of aberrant cells per individual was 2.55, 2.55, and 2.12 from the reference grids. Mean number of lesions per cell was 2.77, 0.86, and 1.9 from the Superfund grids, and 3.55, 2.77, and 2.50 from the reference grids. For the spring 1992 trapping period, more damage was observed in animals from both Superfund and reference sites; however, animals from Superfund grids had more damage than animals from reference grids. Mean number of aberrant cells per individual was 3.50, 3.25, and 3.70 from the Superfund grids, and 2.40, 2.11, and 1.40 from the reference grids. Mean number of lesions per cell was 4.80, 4.25, and 5.50 from the Superfund grids, and 2.60, 2.33, and 1.50 from the reference grids. These data suggest animals may be more susceptible to chromosomal damage during winter months, and animals from the Superfund grids appear to be more severely affected than animals from reference grids

  5. Superfund Record of Decision (EPA Rregion 4): Oak Ridge Reservation (USDOE), (Operable Unit 3), Anderson County, Oak Ridge, TN. (Second remedial action), September 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Oak Ridge Reservation (ORR) (USDOE) (Operable Unit 3) site is an active nuclear weapons component manufacturing facility located in Oak Ridge, Anderson County, Tennessee. The Y-12 plant, which is addressed as Operable Unit 3, is one of several hundred waste disposal sites or areas of contamination at the ORR site requiring Superfund remedial action. The site occupies the upper reaches of East Fork Poplar Creek (EFPC) in Bear Creek Valley. From 1940 to the present, the Y-12 plant has been used to produce nuclear weapons components. From 1955 to 1963, mercury was used in a column-exchange process to separate lithium isotopes. Testing of the three concrete tanks showed that the tank sediment contained mercury, and that contaminated waste is still being discharged into two of the three tanks. The Record of Decision (ROD) focuses on the contaminated sediment in the sedimentation tanks as an interim action. The primary contaminants of concern affecting the sediment are mercury, a metal and radioactive materials. The selected interim remedial action for the site is included

  6. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  7. Superfund TIO videos: Set A. Settlement tools and practices, win-win negotiations, closeout, records management, authorities and liabilities. Part 5. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into 5 sections. Section 1 provides an overview of settlement activities including conducting an information exchange, issuing general notice letters, initiating special notice procedures, receiving good faith offers (GFO), negotiating and settlements, and pursuing enforcement actions. Section 2 covers the types of negotiations that commonly involve OSCs and RPMs. The characteristics of a negotiating style that satisfy all the parties as well as methods for preparing and conducting this type of negotiation are outlined. Section 3 deals with post-removal site control arrangements and other closeout requirements for a removal site, such as completing necessary paperwork. The remedial project closeout procedures also are covered, including the remedial closeout report, operation and maintenance (O ampersand M) arrangements, transfer of site responsibility, and deletion from the National Priorities List (NPL). Section 4 discusses the purpose, procedures, roles and responsibilities associated with records management under Superfund. Section 5 outlines the response authority provided by CERCLA to OCSs and RPMs

  8. Superfund Technical Assistance Grants

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes data related to the Superfund Technical Assistance Grant program, including grant number, award amounts, award dates, period of performance,...

  9. Challenge of superfund community relations

    International Nuclear Information System (INIS)

    Goldman, N.J.

    1991-01-01

    Conducting a community relations effort in a community which is home to a Superfund site is a formidable challenge. Any education press, however appropriate, quickly falls victim to doubt, mistrust of fears of the very public intended to be served by the effort. While each site is uniquely different, the issues raised by affected communities in one part of the country are strikingly similar to those raised in other parts. Those most involved must join those most affected in seeking meaningful solutions and in building the trust that is so vital in moving forward with Superfund

  10. Alternating current electrocoagulation for Superfund site remediation

    International Nuclear Information System (INIS)

    Farrell, C.W.

    1991-01-01

    A study is being conducted by Electro-Pure Systems, Inc. (EPS) under the Emerging Technology portion of the U.S. Environmental Protection Agency's (EPA's) Superfund Innovative Technology Evaluation (SITE) Program to study alternating current electrocoagulation for Superfund site remediation. Alternating current electrocoagulation has proven to be effective in agglomerating and removing colloidal solids, metals and certain organic contaminants from surrogate soils prepared from the US EPA's Synthetic Soil Matrix. Treatments under a wide range of operating conditions have enabled the optimum parameter settings to be established for multiple phase separation. Electrocoagulation enables appreciably enhanced filtration and dewatering rates to be realized for metals- and diesel fuel-spiked surrogate soil slurries; such enhancements are prompted by growth in the mean particle size of the clays and particulates from typically < 10 microns to as much as 150 microns depending on the degree of electrocoagulation. Reduction in the total suspended solids content of clays in all slurries in excess of 90% can routinely be achieved. Bench-scale experiments of the metals-spiked surrogate soils indicate that electrocoagulation preferentially concentrates soluble metals into the sludge phase; excellent metals separation (Pb, Cr, Cu, Cd) can be realized. Experiments on surrogate wastes spiked with volatile organics suggest that this technology is not capable of effecting good volatile extractions from the aqueous phase. Reductions in excess of 80% in the total organic carbon (TOC) content of the diesel fuel-spiked surrogates can, however, be achieved

  11. Restoration principles and criteria: superfund program policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Walker, Stuart

    2006-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) is responsible for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund'. The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund program. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in a consistent manner as with chemical contamination, except to account for the technical differences between radionuclides and chemicals. This consistency is important since at every radioactively contaminated site being addressed under Superfund's primary program for long-term cleanup, the National Priorities List (NPL), chemical contamination is also present. (author)

  12. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a selected set of...

  13. Restoration principles and criteria: Superfund programme policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Shapiro, M.

    2000-01-01

    The Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response is responsible for implementing two key US laws regulating waste management and cleanup: the Resource Conservation and Recovery Act, and the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed ''Superfund''. The purpose of the Superfund programme is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund programme. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in the identical way as chemical contamination. (author)

  14. Regulatory compliance issues related to the White Oak Creek Embayment time-critical removal action

    International Nuclear Information System (INIS)

    Leslie, M.; Kimmel, B.L.

    1991-01-01

    In September 1990, Martin Marietta Energy Systems (Energy Systems) discovered high levels of Cesium-137 ( 137 Cs) in surface sedimenus near the mouth of White Oak Creek Embayment (WOCE). White Oak Creek (WOC) receives surface water drainage from Oak Ridge National Laboratory. Since this discovery, the Department of Energy (DOE) and Energy Systems have pursued actions designed to stabilize the contaminated WOCE sediments under provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and the implementing regulations in the National Contingency Plan (NCP) (40 CFR Part 300), as a time-critical removal action. By definition, a time-critical removal is an action where onsite activities are initiated within six months of the determination that a removal action is appropriate. Time-critical removal actions allow comparatively rapid mobilization to protect human health and the environment without going through the lengthy and extensive CERCLA Remedial Investigation/Feasibility Study/Record of Decision process. Many aspects of the project, in terms of compliance with the substantive requirements of the NCP and ARARs, have exceeded the regulatory requirements, despite the fact that there is no apparent authority on conducting removal actions at Federal facilities. Much of the interpretation of the NCP was groundbreaking in nature for both EPA and DOE. 4 refs., 2 figs

  15. CLEANing the Reward: Counterfactual Actions to Remove Exploratory Action Noise in Multiagent Learning

    Science.gov (United States)

    HolmesParker, Chris; Taylor, Mathew E.; Tumer, Kagan; Agogino, Adrian

    2014-01-01

    Learning in multiagent systems can be slow because agents must learn both how to behave in a complex environment and how to account for the actions of other agents. The inability of an agent to distinguish between the true environmental dynamics and those caused by the stochastic exploratory actions of other agents creates noise in each agent's reward signal. This learning noise can have unforeseen and often undesirable effects on the resultant system performance. We define such noise as exploratory action noise, demonstrate the critical impact it can have on the learning process in multiagent settings, and introduce a reward structure to effectively remove such noise from each agent's reward signal. In particular, we introduce Coordinated Learning without Exploratory Action Noise (CLEAN) rewards and empirically demonstrate their benefits

  16. Superfund record of decision (EPA Region 2): Carroll and Dubies Sewage Disposal, Port Jervis, NY, March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This decision document presents the selected remedial action for the Carroll and Dubies Superfund Site (the Site). This operable unit (OU1) represents the first of two operable units planned for the Site. This operable unit addresses the source areas (lagoons and surrounding impacted soils) at the Site and actions needed to ensure that the source areas do not pose a threat to human health or the environment, including any potential cross media impacts to groundwater.

  17. Superfund TIO videos: Set B. Financial management and SCAP. Part 8. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape covers various aspects of financial management for the Superfund Program. The importance of effective financial management and execution is discussed. The objectives and definitions of the Superfund Comprehensive Accomplishment Plan (SCAP) and the roles and responsibilities of Superfund personnel in the SCAP process are covered

  18. FUSRAP adapts to the amendments of Superfund

    International Nuclear Information System (INIS)

    Atkin, R.G.; Liedle, S.D.; Clemens, B.W.

    1988-01-01

    With the promulgation of the Superfund Amendments and Reauthorization Act (SARA) federal facilities were required to comply with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) in the same manner as any non-government entity. This situation presented challenges for the Department of Energy (DOE) and other federal agencies involved in remedial action work because of the requirements under SARA that overlap other laws requiring DOE compliance, e.g., the National Environmental Policy Act (NEPA). This paper outlines options developed to comply with CERCLA and NEPA as part of an active, multi-site remedial action program. The program, the Formerly Utilized Sites Remedial Action Program (FUSRAP), was developed to identify, clean up, or control sites containing residual radioactive contamination resulting from the nation's early development of nuclear power. During the Manhattan Project, uranium was extracted from domestic and foreign ores and resulted in mill concentrates, purified metals, and waste products that were transported for use or disposal at other locations. Figure 1 shows the steps for producing uranium metal during the Manhattan Project. As a result of these activities materials equipment, buildings, and land became contaminated, primarily with naturally occurring radionuclides. Currently, FUSRAP includes 29 sites; three are on the Environmental Protection Agency's (EPA's) National Priorities List (NPL) of hazardous waste sites

  19. Feasibility study for the United Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    Lincoff, A.H. [US Environmental Protection Agency, San Francisco, CA (United States). Region IX; Costan, G.P.; Montgomery, M.S.; White, P.J. [Pacific Northwest Lab., Richland, WA (United States)

    1994-07-01

    The United Heckathom Superfund Site in Richmond, California, was used to formulate pesticides from approximately 1947 to 1966. Soils at the site and sediments in the harbor were contaminated with various chlorinated pesticides, primarily DDT, as a result of these activities. The US Environmental Protection Agency listed the site on the Superfund National Priorities List in 1990. This document is part of the Remedial Investigation and Feasibility Study phase of the Superfund response, which will provide the basis for selection of a final remedy that will protect human health and the environment and achieve compliance with federal and state envirorunental laws.

  20. Feasibility study for the United Heckathorn Superfund Site, Richmond, California

    International Nuclear Information System (INIS)

    Lincoff, A.H.

    1994-07-01

    The United Heckathom Superfund Site in Richmond, California, was used to formulate pesticides from approximately 1947 to 1966. Soils at the site and sediments in the harbor were contaminated with various chlorinated pesticides, primarily DDT, as a result of these activities. The US Environmental Protection Agency listed the site on the Superfund National Priorities List in 1990. This document is part of the Remedial Investigation and Feasibility Study phase of the Superfund response, which will provide the basis for selection of a final remedy that will protect human health and the environment and achieve compliance with federal and state envirorunental laws

  1. Action memorandum for the Waste Area Grouping 1 Tank WC-14 removal action at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-11-01

    This action memorandum documents approval for a Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (CERCLA), time-critical action. The action will remove radiologically contaminated water from Tank WC-14. The water contains a polychlorinated biphenyl (PCB) at a level below regulatory concern. Tank WC-14 is located in the Waste Area Grouping (WAG) 1 WC-10 Tank Farm at the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. Contaminated sludge remaining in the tank after removal of the liquid will be the subject of a future action

  2. SUPERFUND TREATABILITY CLEARINGHOUSE: BDAT FOR SOLIDIFICATION/STABILIZATION TECHNOLOGY FOR SUPERFUND SOILS (DRAFT FINAL REPORT)

    Science.gov (United States)

    This report evaluates the performance of solidification as a method for treating solids from Superfund sites. Tests were conducted on four different artificially contaminated soils which are representative of soils found at the sites. Contaminated soils were solidified us...

  3. Superfund Record of Decision (EPA Region 5): Ossineke Groundwater Contamination Site, Alpena County, Ossineke, MI. (First remedial action), June 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The Ossineke Ground Water Contamination site is an area overlying a contaminated aquifer in Ossineke, Alpena County, Michigan. The site hydrogeology is characterized by an upper aquifer and lower confined aquifer, both of which supply drinking water to local residents. Historically there have been two contaminant source areas of concern within Ossineke. Area 1 is in the center of the Town of Ossineke where two gas stations are located, consisting of underground storage tanks, and a former automobile rustproofing shop. Area 2 is a laundry and dry cleaning facility that has an associated wash water pond containing chlorinated hydrocarbons and VOCs. The State advised all users of the upper aquifer to stop using their wells. In 1982, the State discovered that a snow plow had hit a gasoline pump causing an unknown amount of gasoline to spill and, subsequently, contaminate the basements of several businesses. In 1986, the State replaced residential wells affected by ground water contamination. Because the contaminants of concern have been confirmed to be related to petroleum releases from underground storage tanks, the Superfund program does not have the authority to address cleanup under CERLCLA. The selected remedial action for the site is that no further action

  4. Superfund TIO videos: Set B. Community relations, communicating with the media and presenting technical information. Part 9. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into three sections. Section 1 discusses the Superfund Community Relations (CR) Program and its history and objectives. Community Relations requirements as defined by CERCLA for Superfund actions are outlined. Community Relations requirements, the nature of community involvement in CR plans, effective CR techniques, and the roles of the OSC, RPM, and EPA Community Relations Coordinator (CRC) are discussed. Section 2 (1) describes the media's perspective on seeking information; (2) identifies five settings and mechanisms for interacting with the media; (3) offers good media-relations techniques; and (4) lists tips for conducting media interviews. Section 3 outlines techniques for presenting technical information, describes how to be prepared to address typical issues of community concern, and identifies the four key elements in handling tough questions

  5. Superfund Site Information - Site Sampling Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes Superfund site-specific sampling information including location of samples, types of samples, and analytical chemistry characteristics of...

  6. 78 FR 14543 - Ward Transformer Superfund Site; Raleigh, Wake County, NC; Notice of Settlement

    Science.gov (United States)

    2013-03-06

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL 9788-2; CERCLA-04-2013-3754] Ward Transformer Superfund Site... Ward Transformer Superfund Site located in Raleigh, Wake County, North Carolina. Under the terms of the.... Submit your comments by Site name Ward Transformer Superfund Site by one of the following methods: [[Page...

  7. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    Science.gov (United States)

    This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse and redevelopment of BRAC federal properties. When the BRAC program began in the early 1990s, EPA worked with DoD and the states to identify uncontaminated areas and these parcels were immediately made available for reuse. Since then EPA has worked with DoD to clean up the contaminated portions of bases. These are usually parcels that were training ranges, landfills, maintenance facilities and other past waste-disposal areas. Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned.This data layer shows Superfund Sites that are located at BRAC Federal Facilities. Additional Superfund sites and other BRAC sites (those that are not Superfund sites) are included in other data layers as part of this web service.BRAC Superfund Sites shown in this web service are derived from the epa.gov website and include links to the relevant web pages within the attribute table. Data about BRAC Superfund Sites are located on their own EPA web pages, and CIMC links to those pages. The CIMC web service

  8. A method for estimating the local area economic damages of Superfund waste sites

    International Nuclear Information System (INIS)

    Walker, D.R.

    1992-01-01

    National Priority List (NPL) sites, or more commonly called Superfund sites, are hazardous waste sites (HWS) deemed by the Environmental Protection Agency (EPA) to impose the greatest risks to human health or welfare or to the environment. HWS are placed and ranked for cleanup on the NPL based on a score derived from the Hazard Ranking System (HRS), which is a scientific assessment of the health and environmental risks posed by HWS. A concern of the HRS is that the rank of sites is not based on benefit-cost analysis. The main objective of this dissertation is to develop a method for estimating the local area economic damages associated with Superfund waste sites. Secondarily, the model is used to derive county-level damage estimates for use in ranking the county level damages from Superfund sites. The conceptual model used to describe the damages associated with Superfund sites is a household-firm location decision model. In this model assumes that households and firms make their location choice based on the local level of wages, rents and amenities. The model was empirically implemented using 1980 census microdata on households and workers in 253 counties across the US. The household sample includes data on the value and structural characteristics of homes. The worker sample includes the annual earnings of workers and a vector worker attributes. The microdata was combined with county level amenity data, including the number of Superfund sites. The hedonic pricing technique was used to estimate the effect of Superfund sites on average annual wages per household and on monthly expenditures on housing. The results show that Superfund sites impose statistically significant damages on households. The annual county damages from Superfund sites for a sample of 151 counties was over 14 billion dollars. The ranking of counties using the damage estimates is correlated with the rank of counties using the HRS

  9. 78 FR 23563 - LWD, Inc. Superfund Site; Calvert City, Marshall County, Kentucky; Notice of Settlement

    Science.gov (United States)

    2013-04-19

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9805-2; CERCLA-04-2013-3751] LWD, Inc. Superfund Site... costs concerning the LWD, Inc., Superfund Site located in Calvert City, Marshall County, Kentucky. The... V. Painter. Submit your comments by Site name LWD, Inc., Superfund Site by one of the following...

  10. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — National Priorities List (NPL) Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access...

  11. Superfund Sites as Anti-landscapes

    DEFF Research Database (Denmark)

    Nye, David

    2017-01-01

    Americans have used a range of narratives to make sense of their settlement and use of natural resources. This article focuses on narratives of environmental degradation after the United States passed legislation mandating the cleanup of toxic sites and provided a Superfund for that purpose. Thre...

  12. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    A. M. Tyson

    2006-01-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  13. CERCLIS (Superfund) ASCII Text Format - CPAD Database

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database (CPAD) contains a selected set...

  14. Occurences and Fate of DDT Principal Isomers/Metabolites, DDA, and o,p'-DDD Enantiomers in Fish, Sediment and Water at a DDT-Impacted Superfund Site

    Science.gov (United States)

    In the 1950s and 60s, discharges from a DDT manufacturing plant contaminated a tributary system of the Tennessee River near Huntsville, Alabama, USA. Regulatory action resulted in declaring the area a Superfund site which required remediation and extensive monitoring. Monitoring ...

  15. 5 CFR 9701.707 - Appeals of mandatory removal actions.

    Science.gov (United States)

    2010-01-01

    ... employee may appeal such actions to the Mandatory Removal Panel (MRP) established under § 9701.708. (b) Procedures. (1) The MRP will establish procedures for the fair, impartial, and expeditious assignment and... other matters as may be necessary to ensure the operation of the MRP. (2) The MRP will conduct a hearing...

  16. Superfund record of decision (EPA Region 2): Carroll and Dubies Sewage Disposal, Port Jervis, Town of Deerpark, Orange County, NY, September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This decision document presents the selected remedial action for the contaminated groundwater at the Carroll and Dubies Superfund Site (the Site). This operable unit represents the second of two operable units planned for the Site. It addresses the contaminated groundwater underlying and downgradient of the Carroll and Dubies site.

  17. Cleanups In My Community (CIMC) - Superfund National Priority List (NPL) Sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Superfund National Priority List Sites as part of the CIMC web service. Superfund is a program administered by the EPA to locate,...

  18. Remediation System Evaluation, McCormick and Baxter Superfund SiteRemediation System Evaluation, McCormick and Baxter Superfund Site

    Science.gov (United States)

    The McCormick and Baxter Creosoting Company, Portland Plant, Superfund Site is located adjacent tothe Willamette River in Portland, Oregon and addresses contamination of soil, groundwater, and riversediments stemming from creosoting operations...

  19. Superfund National Priority List (NPL) Site Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — A set of site boundaries for each site in EPA Region 1 (Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont) on EPA's Superfund National...

  20. Superfund record of decision (EPA Region 6): Oklahoma Refining Company, Cyril, OK. (First remedial action), June 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 160-acre Oklahoma Refining site is a petroleum refinery located on the eastern edge of Cyril, Oklahoma, in Caddo County. The facility included refinery process areas, bulk storage tanks, waste pits, wastewater treatment ponds, and a land treatment area. During the mid-1980's, EPA investigations revealed large-scale organic and heavy metal contamination of onsite soil and ground water. In 1990, EPA conducted a removal action, which included characterization and removal of drums, plugging wells, and wildlife protection measures. The ROD addresses the remediation of onsite contaminated soil, sediment, surface water, and ground water as a final remedy. The primary contaminants of concern affecting the soil, sediment, ground water, and surface water are VOCs, including benzene, toluene, and xylenes; other organics, including PAHs and phenols; and metals, including arsenic, chromium, and lead. The selected remedial action for the site is included

  1. U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites

    International Nuclear Information System (INIS)

    Carey, Pat; Walker, Stuart

    2008-01-01

    This paper describes the Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities. The Environmental Protection Agency (EPA) implements the Superfund program under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA). From the beginning of the Superfund program, Congress envisioned a role for communities. This role has evolved and expanded during the implementation of the Superfund program. Initially, the CERCLA statute had community involvement requirements designed to inform surrounding communities of the work being done at a site. CERCLA's provisions required 1) development of a community relations plan for each site, 2) establishment of information repositories near each site where all publicly available materials related to the site would be accessible for public inspection, 3) opportunities for the public to comment on the proposed remedy for each site and 4) development of a responsiveness summary responding to all significant comments received on the proposed remedy. In recognition of the need for people living near Superfund sites to be well-informed and involved with decisions concerning sites in their communities, SARA expanded Superfund's community involvement activities in 1986. SARA provided the authority to award Technical Assistance Grants (TAGs) to local communities enabling them to hire independent technical advisors to assist them in understanding technical issues and data about the site. The Superfund Community Involvement Program has sought to effectively implement the statutory community involvement requirements, and to go beyond those requirements to find meaningful ways to involve citizens in the cleanup of sites in their communities. We've structured our program around

  2. Remedial design services for Montclair/West Orange and Glen Ridge Superfund sites

    International Nuclear Information System (INIS)

    Urbaniak, T.F.; Tomiczek, P.W. Jr.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites are located 12 miles west of New York City in Essex County, New Jersey. The sites are contaminated with waste materials from radium-processing facilities which operated in the area during the early 1900's. The waste materials, containing radium and other radioactive isotopes were placed in three separate landfill sites. Major public health risks are indoor radon gas build-up and indoor/ outdoor gamma radiation. In 1989, the EPA issued a Record of Decision (ROD) which chose excavation and off-site disposal of material as the preferred alternative. The purpose of this presentation is to highlight key elements of the design process for the remedial action at Montclair. Those key elements are as follows: meeting community relations challenges; measuring radioactive contamination; developing plans and specifications; packaging of remedial action contacts; and continually improving both the process and the designs

  3. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - Non-NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Non-NPL Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a...

  4. In-Depth Case Studies of Superfund Reuse

    Science.gov (United States)

    SRI’s in-depth case studies explore Superfund reuse stories from start to finish. Their purpose is to see what redevelopment strategies worked, acknowledge reuse barriers and understand how communities overcame the barriers to create new reuse outcomes.

  5. Human Health Toxicity Values in Superfund Risk Assessments

    Science.gov (United States)

    This memorandum revises the hierarchy of human health toxicity values generally recommended for use inr isk assessments, originally presented in Risk Assessment Guidance for Superfund Volume I, Part A.

  6. SHIRCO PILOT-SCALE INFRARED INCINERATION SYSTEM AT THE ROSE TOWNSHIP DEMODE ROAD SUPERFUND SITE

    Science.gov (United States)

    Under the Superfund Innovative Technology Evaluation or SITE Program, an evaluation was made of the Shirco Pilot-Scale Infrared Incineration System during 17 separate test runs under varying operating conditions. The tests were conducted at the Demode Road Superfund site in Ros...

  7. SITE COMPREHENSIVE LISTING (CERCLIS) - Contaminants at CERCLIS (Superfund) Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Contaminants at Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Sites - The CERCLIS Public Access Database...

  8. Removal Action Work Plan for 105-DR and 105-F Building Interim Safe Storage Projects and Ancillary Buildings

    International Nuclear Information System (INIS)

    Morton, M.R.

    2000-01-01

    This document contains the removal action work plan for the 105-DR and 105-F Reactor buildings and ancillary facilities. These buildings and facilities are located in the 100-D/DR and 100-F Areas of the Hanford Site, which is owned and operated by the US Department of Energy (DOE), in Benton County, Washington. The 100 Areas (including the 100-D/DR and 100-F Areas) of the Hanford Site were placed on the US Environmental Protection Agency's (EPA's) National Priorities List under the ''Comprehensive Environmental Response, Compensation, and Liability Act of 1980'' (CERCLA). The DOE has determined that hazardous substances in the 105-DR and 105-F Reactor buildings and four ancillary facilities present a potential threat to human health or the environment. The DOE has also determined that a non-time critical removal action is warranted at these facilities. Alternatives for conducting a non-time critical removal action were evaluated in the ''Engineering Evaluation/Cost Analysis for the 105-DR and 105-F Reactor Facilities and Ancillary Facilities'' (DOE-RL 1998a). The engineering evaluation/cost analysis (EE/CA) resulted in the recommendation to decontaminate and demolish the contaminated reactor buildings (except for the reactor blocks) and the ancillary facilities and to construct a safe storage enclosure (SSE) over the reactor blocks. The recommendation was approved in an action memorandum (Ecology et al. 1998) signed by the Washington State Department of Ecology (Ecology), EPA, and DOE. The DOE is the agency responsible for implementing the removal actions in the 105-D/DR and 105-F Areas. Ecology is the lead regulatory agency for facilities in the 100-D/DR Area, and EPA is the lead regulatory agency for facilities in the 100-F Area. The term ''lead regulator agency'' hereinafter, refers to these authorities. This removal action work plan supports implementation of the non-time critical removal action

  9. Report: Remedial Project Manager Turnover at Superfund Sites

    Science.gov (United States)

    Report #2001-M-000015, June 15, 2001. We determined that EPA Region III did not have formal procedures in place to mitigate continuity problems caused by turnover of EPA personnel in the Superfund program.

  10. Regional economic impact assessment: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Harrison, David; Coughlin, Conor; Hogan, Dylan; Edwards, Deborah A; Smith, Benjamin C

    2018-01-01

    The present paper describes a methodology for evaluating impacts of Superfund remedial alternatives on the regional economy in the context of a broader sustainability evaluation. Although economic impact methodology is well established, some applications to Superfund remedial evaluation have created confusion because of seemingly contradictory results. This confusion arises from failure to be explicit about 2 opposing impacts of remediation expenditures: 1) positive regional impacts of spending additional money in the region and 2) negative regional impacts of the need to pay for the expenditures (and thus forgo other expenditures in the region). The present paper provides a template for economic impact assessment that takes both positive and negative impacts into account, thus providing comprehensive estimates of net impacts. The paper also provides a strategy for identifying and estimating major uncertainties in the net impacts. The recommended methodology was applied at the Portland Harbor Superfund Site, located along the Lower Willamette River in Portland, Oregon, USA. The US Environmental Protection Agency (USEPA) developed remedial alternatives that it estimated would cost up to several billion dollars, with construction durations possibly lasting decades. The economic study estimated regional economic impacts-measured in terms of gross regional product (GRP), personal income, population, and employment-for 5 of the USEPA alternatives relative to the "no further action" alternative. Integr Environ Assess Manag 2018;14:32-42. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  11. Superfund Record of Decision (EPA Region 2): NL Industries, Salem County, Pedricktown, NJ. (First remedial action), September 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-27

    The 44-acre NL Industries site is an inactive, secondary lead smelting facility in Pedricktown, Salem County, New Jersey. The site overlies the Cape May aquifer, a potential source of drinking water for local residents. In 1989, EPA began a multi-phased removal action. The Focused Feasibility Study resulted in the issuance of the Early Remedial Action Record of Decision (ROD), designated as Operable Unit (OU2). The nature and extent of remaining contamination on the site and areas adjacent to the site in various environmental media, such as soil, sediment, ground water, surface water, and air, are currently being evaluated and will be addressed as OU1 in a subsequent ROD. The primary contaminants of concern affecting the slag and lead oxide piles, sediment, debris, and standing surface water are metals including arsenic, chromium, and lead. The selected remedial action for the site is included.

  12. 77 FR 16548 - Florida Petroleum Reprocessors Superfund Site; Davie, Broward County, FL; Notice of Settlements

    Science.gov (United States)

    2012-03-21

    ...-2012- 3766; CERCLA-04-2012-3765] Florida Petroleum Reprocessors Superfund Site; Davie, Broward County... costs concerning the Florida Petroleum Reprocessors Superfund Site located in Davie, Broward County.... Painter. Submit your comments by Site name Florida Petroleum Reprocessors by one of the following methods...

  13. Preliminary engineering report waste area grouping 5, Old Hydrofracture Facility Tanks content removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-06-01

    The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facilities Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the U.S. Department of Energy (DOE) Oak Ridge Operations Office, the U.S. Environmental Protection Agency (EPA) Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA is January 1, 1992. One objective of the FFA is to ensure that liquid low-level waste (LLLW) tanks that are removed from service are evaluated and remediated through the CERCLA process. Five inactive LLLW tanks, designated T-1, T-2, T-3, T-4, and T-9, located at the Old Hydrofracture (OHF) Facility in the Melton Valley area of Oak Ridge National Laboratory (ORNL) have been evaluated and are now entering the remediation phase. As a precursor to final remediation, this project will remove the current liquid and sludge contents of each of the five tanks (System Requirements Document, Appendix A). It was concluded in the Engineering Evaluation/Cost Analysis [EE/CA] for the Old Hydrofracture Facility Tanks (DOE 1996) that sluicing and pumping the contaminated liquid and sludge from the five OHF tanks was the preferred removal action. Evaluation indicated that this alternative meets the removal action objective and can be effective, implementable, and cost-effective. Sluicing and removing the tank contents was selected because this action uses (1) applicable experience, (2) the latest information about technologies and techniques for removing the wastes from the tanks, and (3) activities that are currently acceptable for storage of transuranic (TRU) mixed waste

  14. Superfund TIO videos. Set A. Identifying PRPS. Removal process: Removal site evaluation. Part 2. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into three sections. Section 1 details the liability of Potentially Responsible Parties (PRPs) and describes the four classes of PRPs: current owners and operators, former owners and operators, generators, and transporters (if they selected the site). Section 2 lists the goals of the Potentially Responsible Party (PRP) search and explains how to identify key players during the PRP search. How to plan and conduct the PRP search is also outlined. Section 3 outlines the steps involved in conducting a removal site evaluation. A discussion of when to conduct a removal preliminary assessment, a removal site inspection, and an Engineering Evaluation/Cost Analysis (EE/AC) also is covered

  15. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  16. 77 FR 11533 - Anniston PCB Superfund Site, Anniston, Calhoun County, Alabama; Notice of Amended Settlement

    Science.gov (United States)

    2012-02-27

    ... ENVIRONMENTAL PROTECTION AGENCY [CERCLA-04-2012-3763; FRL 9637-7] Anniston PCB Superfund Site... past response costs concerning the Anniston PCB Superfund Site located in Anniston, Calhoun County.... Submit your comments by Site name Anniston PCB by one of the following methods: www.epa.gov/region4...

  17. Smart moves in superfund - revitalization one year later. Volume 1, Number 3, January 1993. Bulletin

    International Nuclear Information System (INIS)

    1993-01-01

    The issue of the Smart Moves in Superfund bulletin series provides an update on the revitalization effort, highlighting National Priorities List (NPL) construction completions, accelerating cleanup, the Superfund Accelerated Cleanup Model, risk assessment/risk management, contracts management, enforcement policy/equity, interagency cooperation, public forms, and state meetings

  18. Centredale Manor Superfund Site in Rhode Island included on EPA List of Targeted for Immediate Attention

    Science.gov (United States)

    Today, the U.S. Environmental Protection Agency released the list of Superfund sites that Administrator Pruitt has targeted for immediate and intense attention. The Centredale Manor Restoration Project superfund site is one of the 21 sites on the list.

  19. Remediation System Evaluation, Douglas Road Landfill Superfund Site

    Science.gov (United States)

    The Douglas Road Landfill Superfund Site is located in St. Joseph County just north of Mishawaka,Indiana. The site consists of a 16-acre capped landfill located on an approximately 32-acre lot (includingthe land purchased in 1999 for a wetlands...

  20. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - Responsible Parties at CERCLIS Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Responsible Parties at CERCLIS Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access...

  1. SITE demonstration of the Dynaphore/Forager Sponge technology to remove dissolved metals from contaminated groundwater

    Energy Technology Data Exchange (ETDEWEB)

    Esposito, C.R. [Environmental Protection Agency, Edison, NJ (United States); Vaccaro, G. [Science Applications International Corp., Hackensack, NJ (United States)

    1995-10-01

    A Superfund Innovative Technology Evaluation (SITE) demonstration was conducted of the Dynaphore/Forager Sponge technology during the week of April 3, 1994 at the N.L. Industries Superfund Site in Pedricktown, New Jersey. The Forager Sponge is an open-celled cellulose sponge incorporating an amine-containing chelating polymer that selectively absorbs dissolved heavy metals in both cationic and anionic states. This technology is a volume reduction technology in which heavy metal contaminants from an aqueous medium are concentrated into a smaller volume for facilitated disposal. The developer states that the technology can be used to remove heavy metals from a wide variety of aqueous media, such as groundwater, surface waters and process waters. The sponge matrix can be directly disposed, or regenerated with chemical solutions. For this demonstration the sponge was set up as a mobile pump-and-treat system which treated groundwater contaminated with heavy metals. The demonstration focused on the system`s ability to remove lead, cadmium, chromium and copper from the contaminated groundwater over a continuous 72-hour test. The removal of heavy metals proceeded in the presence of significantly higher concentrations of innocuous cations such as calcium, magnesium, sodium, potassium and aluminum.

  2. New York's new Superfund regulations: Implications for federal and other state programs

    International Nuclear Information System (INIS)

    Pavetto, C.S.; Rubinton, D.S.

    1994-01-01

    The need for cleaning up hazardous waste disposal sites was identified early in New York. In fact, New York's ''Superfund'' statute preceded the federal Superfund law thereby providing a model for CERCLA. Moreover, there are currently almost as many sites on New York's Registry of Inactive Hazardous Waste Disposal sites as there are sites on the National Priorities List. While New York's law served as a model for the federal CERCLA, CERCLA, in turn, has served as a model for other states' statutes. Similarly, lessons learned from the implementation of state Superfund statutes such as New York's can be instructive for those whose work involves dealing with CERCLA-type issues. This is because the problems associated with site restoration and cleanup, such as exceedingly complex site review and evaluation processes, high transaction costs, and difficulties in prioritizing sites for clean-up based upon the threat or risk of environmental harm, are universal

  3. U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites

    International Nuclear Information System (INIS)

    Martin, K.; Walker, St.

    2009-01-01

    This paper describes the EPA Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities, and what lessons have been learned by EPA when trying to conduct meaningful community involvement at sites. In addition, it discusses tools that EPA has designed to specifically enhance community involvement at radioactively contaminated Superfund sites. In summary, the Superfund program devotes substantial resources to involving the local community in the site cleanup decision making process. We believe community involvement provides us with highly valuable information that must be available to carefully consider remedial alternatives at a site. We also find our employees enjoy their jobs more. Rather than fighting with an angry public they can work collaboratively to solve the problems created by the hazardous waste sites. We have learned the time and resources we devote at the beginning of a project to developing relationships with the local community, and learning about their issues and concerns is time and resources well spent. We believe the evidence shows this up-front investment helps us make better cleanup decisions, and avoids last minute efforts to work with a hostile community who feels left out of the decision-making process. (authors)

  4. Superfund at work: Hazardous waste cleanup efforts nationwide, fall 1992. (Wide Beach section of Brant, New York)

    International Nuclear Information System (INIS)

    1992-01-01

    Wide-spread contamination of polychlorinated biphenyls (PCBs) threatened the Wide Beach section of Brant, New York, a popular vacation resort. EPA's Superfund program effectively completed a permanent cleanup of Wide Beach in the span of one year. Other highlights included: a new and innovative technology to remove PCB contamination; reduction of PCBs to one-fifth of acceptable levels; temporary relocation of residents who were concerned for their health while cleanup activities took place; newly paved roads and driveways, re-landscaped yards, and a new storm sewer system; and restoration of ecologically sensitive wetlands. EPA's achievements significantly reduced PCB risks at Wide Beach, and left a satisfied community in Brant

  5. 40 CFR 35.4040 - How many groups can receive a TAG at one Superfund site?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false How many groups can receive a TAG at one Superfund site? 35.4040 Section 35.4040 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Eligible? § 35.4040 How many groups can receive a TAG at one Superfund site? (a) Only one TAG may be...

  6. Strategy to Ensure Institutional Control Implementation at Superfund Sites

    Science.gov (United States)

    This document sets forth EPA’s strategy (Strategy) for ensuring that institutional controls (ICs) are successfully implemented at Superfund sites, with an emphasis on evaluating ICs at sites where all construction of all remedies is complete (construction complete sites).

  7. Privacy Impact Assessment for the Enforcement Superfund Tracking System

    Science.gov (United States)

    This Enforcement Superfund Tracking System (ESTS) collects publicly available information from the California Secretary of State on businesses. Learn how this data is collected, how it will be used, access to the data, and the purpose of data collection.

  8. Removal action report on Waste Area Grouping 4 seeps 4 and 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-12-01

    This report documents removal action activities for a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) non-time-critical removal action as described in the Action Memorandum prepared in 1996. The technical objective of this removal action was to reduce the release of strontium 90 ( 90 Sr) into an ephemeral tributary to White Oak Creek from Waste Area Grouping 4 (WAG 4) seeps, as measured at Monitoring Station (MS) 1 at ORNL, Oak Ridge, TN. Design was initiated in early January 1996 and grouting activities were completed in late October 9996. Portions of four waste disposal trenches were injected using low-temperature permeation grouting technology with multiple formulations of grouts to reduce the in situ hydraulic conductivity of the waste materials and ultimately reduce the off-site transport of 90 Sr

  9. 78 FR 47317 - Ore Knob Mine Superfund Site; Laurel Springs, Ashe County, North Carolina; Notice of Settlement

    Science.gov (United States)

    2013-08-05

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9843-3; CERCLA-04-2013-3759] Ore Knob Mine Superfund Site; Laurel Springs, Ashe County, North Carolina; Notice of Settlement AGENCY: Environmental Protection Agency... settlement with Herbert N. Francis concerning the Ore Knob Mine Superfund Site located in Laurel Springs...

  10. EPA [Environmental Protection Agency] SITE [Superfund Innovative Technology Evaluation] program seeks technology proposals

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    EPA will issue an RFP to initiate the SITE-005 solicitation for demonstration of technologies under the Superfund Innovative Technology Evaluation (SITE) Program. This portion of the SITE program offers a mechanism for conducting a joint technology demonstration between EPA and the private sector. The goal of the demonstration program is to provide an opportunity for developers to demonstrate the performance of their technologies on actual hazardous wastes at Superfund sites, and to provide accurate and reliable data on that performance. Technologies selected must be of commercial scale and provide solutions to problems encountered at Superfund Sites. Primary emphasis in the RFP is on technologies that address: treatment of mixed, low level radioactive wastes in soils and groundwater; treatment of soils and sludges contaminated with organics and/or inorganics, materials handling as a preliminary step to treatment or further processing, treatment trains designed to handle specific wastes, are in situ technologies, especially those processes providing alternatives to conventional groundwater pump and treat techniques

  11. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-28

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  12. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects

  13. Optimization Review: Carson River Mercury Superfund Site, Carson City, Nevada

    Science.gov (United States)

    The Carson River Mercury Site (CRMS) (Figure 1) is located in northwest Nevada and was designated a Superfund site in 1990 because of elevated mercury concentrations observed in surface water, sediments and biota inhabiting the site.

  14. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation

  15. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  16. Remediation System Evaluation, Savage Municipal Water Supply Superfund Site (PDF)

    Science.gov (United States)

    The Savage Municipal Water Supply Superfund Site, located on the western edge of Milford, New Hampshire, consists of a source area and an extended plume that is approximately 6,000 feet long and 2,500 feet wide.

  17. INVESTIGATION OF DENTURE REMOVAL PROCESS BY MEANS OF DESTRUCTION OF FIXING CEMENT BY ULTRASOUND ACTION

    Directory of Open Access Journals (Sweden)

    M. G. Kiselev

    2007-01-01

    Full Text Available The paper contains results of experimental investigations in respect of denture removal processes using as models so natural teeth as well and this removal process presupposes destruction of fixing cement by ultrasound action. It has been established that the best conditions for separation of a denture from a tooth body are ensured while ultrasound is acting on non-removable denture structure in liquid phase (water. At the expense of sound-capillary effect water fills in porous structure of fixing cement at high speed and a cavitation that appears in it leads to intensive cement destruction (dispersion.

  18. Mining-Related Sediment and Soil Contamination in a Large Superfund Site: Characterization, Habitat Implications, and Remediation.

    Science.gov (United States)

    Juracek, K E; Drake, K D

    2016-10-01

    Historical mining activity (1850-1970) in the now inactive Tri-State Mining District provided an ongoing source of lead and zinc to the environment including the US Environmental Protection Agency Superfund site located in Cherokee County, southeast Kansas, USA. The resultant contamination adversely affected biota and caused human health problems and risks. Remediation in the Superfund site requires an understanding of the magnitude and extent of contamination. To provide some of the required information, a series of sediment and soil investigations were conducted in and near the Superfund site to characterize lead and zinc contamination in the aquatic and floodplain environments along the main-stem Spring River and its major tributaries. In the Superfund site, the most pronounced lead and zinc contamination, with concentrations that far exceed sediment quality guidelines associated with potential adverse biological effects, was measured for streambed sediments and floodplain soils located within or downstream from the most intensive mining-affected areas. Tributary streambeds and floodplains in affected areas are heavily contaminated with some sites having lead and zinc concentrations that are an order of magnitude (or more) greater than the sediment quality guidelines. For the main-stem Spring River, the streambed is contaminated but the floodplain is mostly uncontaminated. Measured lead and zinc concentrations in streambed sediments, lakebed sediments, and floodplain soils documented a persistence of the post-mining contamination on a decadal timescale. These results provide a basis for the prioritization, development, and implementation of plans to remediate contamination in the affected aquatic and floodplain environments within the Superfund site.

  19. Mining-related sediment and soil contamination in a large Superfund site: Characterization, habitat implications, and remediation

    Science.gov (United States)

    Juracek, Kyle E.; Drake, K. D.

    2016-01-01

    Historical mining activity (1850–1970) in the now inactive Tri-State Mining District provided an ongoing source of lead and zinc to the environment including the US Environmental Protection Agency Superfund site located in Cherokee County, southeast Kansas, USA. The resultant contamination adversely affected biota and caused human health problems and risks. Remediation in the Superfund site requires an understanding of the magnitude and extent of contamination. To provide some of the required information, a series of sediment and soil investigations were conducted in and near the Superfund site to characterize lead and zinc contamination in the aquatic and floodplain environments along the main-stem Spring River and its major tributaries. In the Superfund site, the most pronounced lead and zinc contamination, with concentrations that far exceed sediment quality guidelines associated with potential adverse biological effects, was measured for streambed sediments and floodplain soils located within or downstream from the most intensive mining-affected areas. Tributary streambeds and floodplains in affected areas are heavily contaminated with some sites having lead and zinc concentrations that are an order of magnitude (or more) greater than the sediment quality guidelines. For the main-stem Spring River, the streambed is contaminated but the floodplain is mostly uncontaminated. Measured lead and zinc concentrations in streambed sediments, lakebed sediments, and floodplain soils documented a persistence of the post-mining contamination on a decadal timescale. These results provide a basis for the prioritization, development, and implementation of plans to remediate contamination in the affected aquatic and floodplain environments within the Superfund site.

  20. Superfund XV conference proceedings. Volume 1

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This conference was held November 29--December 1, 1994 in Washington, D.C..The purpose of this conference was to provide a forum for exchange of state-of-the-art information on Superfund. Papers are included on the following topics: bioremediation; building decontamination; environmental policy issues; federal environmental restoration; groundwater remediation; innovative sampling and analytical technologies; laboratory methods; metals management; mixed wastes; PCB waste management; remediation technology and case studies; and risk assessment. Individual papers have been processed separately for inclusion in the appropriate data bases

  1. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-24

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  2. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects

  3. Superfund Technology Evaluation Report: SITE Program Demonstration Test Shirco Pilot-Scale Infrared Incineration System at the Rose Township Demode Road Superfund Site Volume I

    Science.gov (United States)

    The Shirco Pilot-Scale Infrared Incineration System was evaluated during a series of seventeen test runs under varied operating conditions at the Demode Road Superfund Site located in Rose Township, Michigan. The tests sought to demonstrate the effectiveness of the unit and the t...

  4. Diffusive flux of PAHs across sediment-water and water-air interfaces at urban superfund sites.

    Science.gov (United States)

    Minick, D James; Anderson, Kim A

    2017-09-01

    Superfund sites may be a source of polycyclic aromatic hydrocarbons (PAHs) to the surrounding environment. These sites can also act as PAH sinks from present-day anthropogenic activities, especially in urban locations. Understanding PAH transport across environmental compartments helps to define the relative contributions of these sources and is therefore important for informing remedial and management decisions. In the present study, paired passive samplers were co-deployed at sediment-water and water-air interfaces within the Portland Harbor Superfund Site and the McCormick and Baxter Superfund Site. These sites, located along the Willamette River (Portland, OR, USA), have PAH contamination from both legacy and modern sources. Diffusive flux calculations indicate that the Willamette River acts predominantly as a sink for low molecular weight PAHs from both the sediment and the air. The sediment was also predominantly a source of 4- and 5-ring PAHs to the river, and the river was a source of these same PAHs to the air, indicating that legacy pollution may be contributing to PAH exposure for residents of the Portland urban center. At the remediated McCormick and Baxter Superfund Site, flux measurements highlight locations within the sand and rock sediment cap where contaminant breakthrough is occurring. Environ Toxicol Chem 2017;36:2281-2289. © 2017 SETAC. © 2017 SETAC.

  5. Electrochemical peroxidation of PCBs and VOCs in superfund site water and sediments

    Energy Technology Data Exchange (ETDEWEB)

    Scrudato, R.J.; Chiarenzelli, J.R. [SUNY, Oswego, NY (United States)

    1996-12-31

    An electrochemical peroxidation (ECP) process has been developed and used to degrade polychlorinated biphenyls (PCB) and volatile organic compounds (VOC)-contaminated water, sludge, and sediments at a New York State Federal and State Superfund Site. The process involves passing an oscillating low-amperage (<10 amps) current through steel electrodes immersed in an acidified water or sediment slurry into which hydrogen peroxide (<1,000 ppm) is added. The generated free radicals attack organic compounds, including organo-metallic complexes and refractory compounds including PCBs. PCB degradation ranged from about 30% to 80% in experiments involving Federal Superfund Site sediments; total PCBs were reduced by {approximately}97% to 68%, respectively, in water and slurry collected from a State Superfund subsurface storage tank. VOC bench-scale experiments involved chloroethane, 1,1-dichloroethane, dichloromethane, 1,1,1-trichloroethane, and acetone and after a 3-min ECP treatment, degradation ranged from >94% to about 99.9%. Results indicate the ECP is a viable process to degrade organic contaminants in water and sediment suspensions. Because the treated water suspensions are acidified, select trace metal sorbed to the particulates is solubilized and therefore can be segregated from the particulates, offering a process that simultaneously degrades organic contaminants and separates trace metals. 19 refs., 1 fig., 4 tabs.

  6. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-01-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded

  7. USA - Paper provided by the US delegation to the RWMC. Site Decontamination and Clean-up Under the U.S. EPA 'Superfund'

    International Nuclear Information System (INIS)

    2003-01-01

    Contaminated and hazardous waste sites, including nuclear facilities, may be subject to clean-up under the U.S. Environmental Protection Agency (EPA). The Comprehensive Environmental Response, Compensation, and Liabilities Act (CERCLA), commonly known as 'Superfund', authorises EPA to respond to releases or threatened releases of hazardous substances, pollutants, or contaminants that may endanger public health or the environment. The legislation defines hazardous substances to include radiation. Entry into Superfund: The EPA may be notified of a site potentially requiring clean up from any source. Potential sites are evaluated under a numerical hazard ranking system, and are then included on the clean-up list ('National Priorities List') if they meet an established threshold. Nuclear Facilities and Radioactively Contaminated Sites under Superfund: Any site may be subject to CERCLA action if EPA determines that it poses a hazard. There are three major types of sites that have been or are subject to action under this program: Federal nuclear facilities, Decommissioned facilities, Privately-owned, unlicensed sites Liabilities Under Superfund: The authorising legislation specifically provided for liability of persons responsible for releases of hazardous waste at uncontrolled sites. Liability under CERCLA is 'strict,' 'retroactive,' and 'joint and several'. Thus, the burden of proof for disproving liability is quite high, and that the extent of the liability is not limited to the share of the waste or hazardous substance contributed by a party. The EPA may pursue liable parties to recover past and future costs associated with clean-up, including direct costs and indirect costs incurred by both EPA and its contractors. Clean-Up Levels: Clean-up goals and technologies are established on a site-specific basis. In general, clean-up goals must meet risk requirements and be consistent with applicable standards. Other factors such as community acceptance, volume reduction

  8. Towards identifying the next generation of superfund and hazardous waste site contaminants

    Science.gov (United States)

    Ela, Wendell P.; Sedlak, David L.; Barlaz, Morton A.; Henry, Heather F.; Muir, Derek C.G.; Swackhamer, Deborah L.; Weber, Eric J.; Arnold, Robert G.; Ferguson, P. Lee; Field, Jennifer A.; Furlong, Edward T.; Giesy, John P.; Halden, Rolf U.; Henry, Tala; Hites, Ronald A.; Hornbuckle, Keri C.; Howard, Philip H.; Luthy, Richard G.; Meyer, Anita K.; Saez, A. Eduardo; vom Saal, Frederick S.; Vulpe, Chris D.; Wiesner, Mark R.

    2011-01-01

    Background This commentary evolved from a workshop sponsored by the National Institute of Environmental Health Sciences titled "Superfund Contaminants: The Next Generation" held in Tucson, Arizona, in August 2009. All the authors were workshop participants.

  9. Private-Sector Cleanup Expenditures and Transaction Costs at 18 Superfund Sites (1993)

    Science.gov (United States)

    Superfund allows the government either to clean up a site and recover its cost from the potentially responsible parties (PRPs) or to require the PRPs to undertake the cleanup themselves. This study examines private-sector expenditures and transaction-costs

  10. Superfund Record of Decision (EPA region 2): Glen Ridge Radium site, Essex County, NJ. (Second remedial action), June 1990. Final report

    International Nuclear Information System (INIS)

    1990-01-01

    The 90-acre Glen Ridge Radium site is a residential community in the Borough of Glen Ridge, Essex County, New Jersey. The site is adjacent to another Superfund site, the Montclair/West Orange site. The Glen Ridge site includes a community of 274 properties serviced by surface reservoirs in northern New Jersey. In the early 1900s, a radium processing or utilization facility was located in the vicinity of the site. EPA investigations in 1981 and 1983 confirmed the presence of gamma radiation contamination in the Glen Ridge area and in several adjacent houses. The ROD complements the previous 1989 ROD for this site and provides a final remedy. The primary contaminant of concern affecting the soil is radium 226

  11. Optimization Evaluation: Lee Chemical Superfund Site, City Of Liberty, Clay County, Missouri

    Science.gov (United States)

    The Lee Chemical Superfund Site (site) is located along Missouri Highway 210 in Liberty, Missouri, approximately 15 miles east of Kansas City, Missouri. Currently, the site is a vacant lot of approximately2.5 acres in a flat alluvial plain.

  12. An evaluation of remote sensing technologies for the detection of fugitive contamination at selected Superfund hazardous waste sites in Pennsylvania

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2014-01-01

    This evaluation was conducted to assess the potential for using both traditional remote sensing, such as aerial imagery, and emerging remote sensing technology, such as hyperspectral imaging, as tools for postclosure monitoring of selected hazardous waste sites. Sixteen deleted Superfund (SF) National Priorities List (NPL) sites in Pennsylvania were imaged with a Civil Air Patrol (CAP) Airborne Real-Time Cueing Hyperspectral Enhanced Reconnaissance (ARCHER) sensor between 2009 and 2012. Deleted sites are those sites that have been remediated and removed from the NPL. The imagery was processed to radiance and atmospherically corrected to relative reflectance with standard software routines using the Environment for Visualizing Imagery (ENVI, ITT–VIS, Boulder, Colorado) software. Standard routines for anomaly detection, endmember collection, vegetation stress, and spectral analysis were applied.

  13. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2011-01-01

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  14. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  15. Cleanups In My Community (CIMC) - Federal facilities that are also Superfund sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — Federal facilities are properties owned by the federal government. This data layer provides access to Federal facilities that are Superfund sites as part of the CIMC...

  16. 77 FR 13603 - Anniston PCB Superfund Site; Anniston, Calhoun County, AL; Correction

    Science.gov (United States)

    2012-03-07

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9644-2; CERCLA-04-2012-3763] Anniston PCB Superfund Site... FR 11533 (FRL-9637-7), EPA posted a Notice of Amended Settlement concerning the Anniston PCB... the settlement are available from Ms. Paula V. Painter. Submit your comments by Site name Anniston PCB...

  17. Pilot-scale incineration of comtaminated soils from the drake chemical superfund site. Final report

    International Nuclear Information System (INIS)

    King, C.; Lee, J.W.; Waterland, L.R.

    1993-03-01

    A series of pilot-scale incineration tests were performed at the U.S. Environmental Protection Agency's (EPA's) Incineration Research Facility to evaluate the potential of incineration as an option to treat contaminated soils from the Drake Chemical Superfund site in Lock Haven, Pennsylvania. The soils at the Drake site are reported to be contaminated to varying degrees with various organic constituents and several hazardous constituent trace metals. The purpose of the test program was to evaluate the incinerability of selected site soils in terms of the destruction of contaminant organic constituents and the fate of contaminant trace metals. All tests were conducted in the rotary kiln incineration system at the IRF. Test results show that greater than 99.995 percent principal organic hazardous constituent (POHC) destruction and removal efficiencies (DRE) can be achieved at kiln exit gas temperatures of nominally 816 C (1,500 F) and 538 C (1,000 F). Complete soil decontamination of semivolatile organics was achieved; however, kiln ash levels of three volatile organic constituents remained comparable to soil levels

  18. Remediation System Evaluation, Tutu Wellfield Superfund Site, St. Thomas, U.S. Virgin Islands

    Science.gov (United States)

    The Tutu Wellfield Superfund Site is a 1.5 square mile site located on the eastern end of St. Thomas, U.S. Virgin Islands (USVI) within the upper Turpentine Run surface drainage basin in the Anna’s Retreat area.

  19. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  20. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  1. Blasting at a Superfund chemical waste site

    International Nuclear Information System (INIS)

    Burns, D.R.

    1991-01-01

    During the summer of 1989, Maine Drilling and Blasting of Gardiner, Maine was contracted by Cayer Corporation of Harvard, Massachusetts to drill and blast an interceptor trench at the Nyanza Chemical Superfund Site in Ashland, Massachusetts. The interceptor trench was to be 1,365 feet long and to be blasted out of granite. The trench was to be 12 feet wide at the bottom with 1/1 slopes, the deepest cut being 30 feet deep. A French drain 12 feet wide by 15 to 35 feet deep was blasted below the main trench on a 2% slope from its center to each end. A French drain is an excavation where the rock is blasted but not dug. The trench would be used as a perimeter road with any ground water flow going through the French drain flowing to both ends of the trench. Being a Superfund project turned a simple blasting project into a regulatory nightmare. The US Environmental Protection Agency performed all the chemical related functions on site. The US Army Corps of Engineers was overseeing all related excavation and construction on site, as was the Massachusetts Department of Environmental Quality Engineering, the local Hazardous Wastes Council, and the local Fire Department. All parties had some input with the blasting and all issues had to be addressed. The paper outlines the project, how it was designed and completed. Also included is an outline of the blast plan to be submitted for approval, an outline of the Safety/Hazardous Waste training and a description of all the problems which arose during the project by various regulatory agencies

  2. Removal Action Workplan for the 105-DR and 105-F Building Interim Safe Storage Projects and Ancillary Buildings

    International Nuclear Information System (INIS)

    Rodovsky, T. J.

    1999-01-01

    This document is the removal action workplan (RAW) for the 105-DR and 105-F Reactor Buildings and ancillary facilities. These buildings and facilities are located in the 100-D/DR and 100-F Areas of the Hanford Site in Benton County, Washington, which is owned and operated by the U.S. Department of Energy (DOE). The 100 Areas (including 100-D/DR and 100-F Areas) of the Hanford Site were placed on the U.S. Environmental Protection Agency's (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation,and Liability Act of 1980 (CERCLA). DOE has determined that hazardous substances in the 105-DR and 105-F Reactor Buildings and four ancillary facilities present a potential threat to human health or the environment DOE has also determined that a non-time critical removal action is warranted at these facilities

  3. Guidance: Strategies to Achieve Timely Settlement and Implementation of RD/RA at Superfund Sites

    Science.gov (United States)

    Memorandum recommends strategies to encourage PRPs to enter into a settlement using the model RD/RA Consent Decree; discusses the current model UAO; and suggests practical alternatives to expedite Superfund settlements and the cleanup process.

  4. Renton's Quendall Terminals on List of EPA Superfund Sites Targeted for Immediate, Intense Attention

    Science.gov (United States)

    EPA released the list of Superfund sites that Administrator Pruitt has targeted for intense and immediate attention, including the Quendall Terminals Site, a former creosote facility on the shore of Lake Washington in Renton, Washington.

  5. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse...

  6. Evaluating public participation in environmental decision-making: EPA's superfund community involvement program.

    Science.gov (United States)

    Susan Charnley; Bruce. Engelbert

    2005-01-01

    This article discusses an 8-year, ongoing project that evaluates the Environmental Protection Agency's Superfund community involvement program. The project originated as a response to the Government Performance and Results Act, which requires federal agencies to articulate program goals, and evaluate and report their progress in meeting those goals. The evaluation...

  7. Removal of soluble toxic metals from water

    International Nuclear Information System (INIS)

    Buckley, L.P.; Vijayan, S.; McConeghy, G.J.; Maves, S.R.; Martin, J.F.

    1990-05-01

    The removal of selected, soluble toxic metals from aqueous solutions has been accomplished using a combination of chemical treatment and ultrafiltration. The process has been evaluated at the bench-scale and is undergoing pilot-scale testing. Removal efficiencies in excess of 95-99% have been realized. The test program at the bench-scale investigated the limitations and established the optimum range of operating parameters for the process, while the tests conducted with the pilot-scale process equipment are providing information on longer-term process efficiencies, effective processing rates, and fouling potential of the membranes. With the typically found average concentrations of the toxic metals in groundwaters at Superfund sites used as the feed solution, the process has decreased levels up to 100-fold or more. Experiments were also conducted with concentrated solutions to determine their release from silica-based matrices. The solidified wastes were subjected to EP Toxicity test procedures and met the criteria successfully. The final phase of the program involving a field demonstration at a uranium tailings site will be outlined

  8. Biomonitoring for metal contamination near two Superfund sites in Woburn, Massachusetts, using phytochelatins

    International Nuclear Information System (INIS)

    Gawel, James E.; Hemond, Harold F.

    2004-01-01

    Characterizing the spatial extent of groundwater metal contamination traditionally requires installing sampling wells, an expensive and time-consuming process in urban areas. Moreover, extrapolating biotic effects from metal concentrations alone is problematic, making ecological risk assessment difficult. Our study is the first to examine the use of phytochelatin measurements in tree leaves for delimiting biological metal stress in shallow, metal-contaminated groundwater systems. Three tree species (Rhamnus frangula, Acer platanoides, and Betula populifolia) growing above the shallow groundwater aquifer of the Aberjona River watershed in Woburn, Massachusetts, display a pattern of phytochelatin production consistent with known sources of metal contamination and groundwater flow direction near the Industri-Plex Superfund site. Results also suggest the existence of a second area of contaminated groundwater and elevated metal stress near the Wells G and H Superfund site downstream, in agreement with a recent EPA ecological risk assessment. Possible contamination pathways at this site are discussed

  9. EMERGING TECHNOLOGY BULLETIN: RECLAMATION OF LEAD FROM SUPERFUND WASTE MATERIAL USING SECONDARY LEAD SMELTERS

    Science.gov (United States)

    This process involves incorporating lead-contaminated Superfund waste with the regular feed to a secondary lead smelter. Since secondary lead smelters already recover lead from recycled automobile batteries, it seems likely that this technology could be used to treat waste from ...

  10. Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (Y/ER-301) was prepared (1) to safely, cost-effectively, and efficiently evaluate the environmental impact of solid material in the two debris areas in the context of industrial land uses (as defined in the Bear Creek Valley Feasibility Study) to support the Engineering Evaluation/Cost Assessment and (2) to evaluate, define, and implement the actions to mitigate these impacts. This work was performed under Work Breakdown Structure 1.x.01.20.01.08

  11. 1992 update of US EPA's Superfund Innovative Technology Evaluation (SITE) Emerging Technology Program

    International Nuclear Information System (INIS)

    Lewis, N.M.; Barkley, N.P.; Williams, T.

    1992-01-01

    The Superfund Innovative Technology Evaluation (SITE) Emerging Technology Program (ETP) has financially supported further development of bench- and pilot-scale testing and evaluation of innovative technologies for use at hazardous waste sites for five years. The ETP was established under the Superfund Amendments and Reauthorization Act (SARA) of 1986. The ETP complies with the goal of the SITE Program to promote, accelerate and make commercially available the development of alternative/innovative treatment technologies for use at Superfund sites. Technologies are submitted to the ETP through yearly solicitations for Preproposals. Applicants are asked to submit a detailed project proposal and a cooperative agreement application that requires Developer/EPA cost sharing. EPA co-funds selected Developers for one to two years. Second-year funding requires documentation of significant progress during the first year. Facilities, equipment, data collection, performance and development are monitored throughout the project. The US Department of Energy (DOE) and the US Air Force (USAF) are participants in the ETP. DOE has co-funded ETP projects since 1990 and the USAF since 1991. A goal of the ETP is to move developed technologies to the field-demonstration stage. A developer may be considered for participation in the SITE Demonstration Program if performance in the ETP indicates the technology is field-ready for evaluation. Six technology categories: biological, chemical, materials handling, physical, solidification/stabilization and thermal, are presently in the ETP. Technologies of primary interest to EPA are those that can treat complex mixtures of hazardous organic and inorganic contaminants and provide improved solids handling and/or pretreatment. An account of the background and progress of the ETP's first five years is presented in this paper. Technologies currently in the ETP are noted, and developers and EPA Project Managers, are listed. 4 refs., 11 figs., 6 tabs

  12. A General Chemistry Assignment Analyzing Environmental Contamination for the Depue, IL, National Superfund Site

    Science.gov (United States)

    Saslow Gomez, Sarah A.; Faurie-Wisniewski, Danielle; Parsa, Arlen; Spitz, Jeff; Spitz, Jennifer Amdur; Loeb, Nancy C.; Geiger, Franz M.

    2015-01-01

    The classroom exercise outlined here is a self-directed assignment that connects students to the environmental contamination problem surrounding the DePue Superfund site. By connecting chemistry knowledge gained in the classroom with a real-world problem, students are encouraged to personally connect with the problem while simultaneously…

  13. Data management implementation plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The former YS-860 Firing Ranges are located outside the primary facility fenceline at the Y-12 Plant within the Upper East Fork Poplar Creek watershed. The lead-contaminated soils at this site will be removed as part of early source actions of the Oak Ridge Reservation Environmental Restoration Program. The removal action will focus on the excavation of bullets and lead-contaminated soil from the shooting range berms, transportation of the material to a certified treatment and/or disposal facility, demolition and landfilling of a concrete trench and asphalt pathways, and grading and revegetating of the entire site. The primary purpose of environmental data management is to provide a system for generating and maintaining technically defensible data. To meet current regulatory requirements for the Environmental Restoration Program, complete documentation of the information flow must be established. This necessitates that each step in the data management process (collection, management, storage, and analysis) be adequately planned and documented. This document will serve to identify data management procedures, expected data types and flow, and roles and responsibilities for all data management activities associated with the YS-860 Firing Ranges removal action

  14. Selective removal of dissolved toxic metals from groundwater by ultrafiltration in combination with chemical treatment

    International Nuclear Information System (INIS)

    Buckley, L.P.; Le, V.T.; McConeghy, G.J.; Martin, J.F.

    1989-09-01

    An alternative in-place process for the removal of toxic heavy metals based on aqueous solution chemistry and treatment is being evaluated under the auspices of the Emerging Technologies Program funded through the USEPA's Superfund Innovative Technology Evaluation Program. The technique involves the contacting of aqueous solutions containing the heavy metal contaminants with low concentrations of polyelectrolytes, and then removing the polyelectrolytes from solution with ultrafiltration membranes. The first phase of the program is considered complete. Success has been achieved for the separation of soluble, heavy metal ions: cadmium, lead, and mercury even in the presence of an organic compound, toluene. Removal was successful at alkaline conditions, using any combination of membrane material or polyelectrolyte. Arsenic was removed, but not effectively, using the current polyelectrolytes, simply because arsenic is present as an anionic species rather than as a cationic species. Optimization of the process variables is nearing completion and pilot and field testing will take place in the second year of the program to verify the process under realistic conditions and to establish process economics

  15. 75 FR 81269 - Ward Transformer Superfund Site Raleigh, Wake County, NC; Notice of Settlements

    Science.gov (United States)

    2010-12-27

    ... ENVIRONMENTAL PROTECTION AGENCY [Docket EPA-RO4-SFUND-2010-1053, FRL-9243-2] Ward Transformer... entered into a five settlements for reimbursement of past response costs concerning the Ward Transformer... Docket ID No. EPA-RO4- SFUND-2010-1053 or Site name Ward Transformer Superfund Site by one of the...

  16. 78 FR 76143 - Proposed CERCLA Settlement Relating to the Paul's Tank Cleaning Service Superfund Site...

    Science.gov (United States)

    2013-12-16

    ... Paul's Tank Cleaning Service Superfund Site, Burlington County, New Jersey AGENCY: Environmental.... (``Settling Party''). The Settling Party is a potentially responsible party, pursuant to Section 107(a) of CERCLA, and thus is potentially liable for response costs incurred at or in connection Paul's Tank...

  17. Human health risks associated with asbestos abatement.

    Science.gov (United States)

    Chrostowski, P C; Foster, S A; Anderson, E L

    1991-09-01

    Upperbound lifetime excess cancer risks were calculated for activities associated with asbestos abatement using a risk assessment framework developed for EPA's Superfund program. It was found that removals were associated with cancer risks to workers which were often greater than the commonly accepted cancer risk of 1 x 10(-6), although lower than occupational exposure limits associated with risks of 1 x 10(-3). Removals had little effect in reducing risk to school populations. Risks to teachers and students in school buildings containing asbestos were approximately the same as risks associated with exposure to ambient asbestos by the general public and were below the levels typically of concern to regulatory agencies. During abatement, however, there were increased risks to both workers and nearby individuals. Careless, everyday building maintenance generated the greatest risk to workers followed by removals and encapsulation. If asbestos abatement was judged by the risk criteria applied to EPA's Superfund program, the no-action alternative would likely be selected in preference to removal in a majority of cases. These conclusions should only be interpreted within the context of an overall asbestos risk management program, which includes consideration of specific fiber types and sizes, sampling and analytical limitations, physical condition of asbestos-containing material, episodic peak exposures, and the number of people potentially exposed.

  18. The Use of Haz-Flote to Efficiently Remove Mercury from Contaminated Materials

    Energy Technology Data Exchange (ETDEWEB)

    Terry Brown

    2009-03-03

    There are thousands of known contaminated sites in the United Stated, including Superfund sites (1500 to 2100 sites), RCRA corrective action sites (1500 to 3500 sites), underground storage tanks (295,000 sites), U.S. Department of Defense sites (7300 sites), U.S. Department of Energy sites (4,000 sites), mining refuse piles, and numerous other hazardous metals and organic contamination sites. Only a small percentage of these sites has been cleaned up. The development of innovative technologies to handle the various clean-up problems on a national and international scale is commonplace. Many innovative technologies have been developed that can be used to effectively remediate contaminated materials. Unfortunately, many of these technologies are only effective for materials coarser than approximately 200 mesh. In addition, these technologies usually require considerable investment in equipment, and the clean-up costs of soil material are relatively high - in excess of $100 to $500 per yd{sup 3}. These costs result from the elaborate nature of the processes, the costs for power, and the chemical cost. The fine materials are disposed of or treated at considerable costs. As a result, the costs often associated with amelioration of contaminated sites are high. Western Research institute is in the process of developing an innovative soil washing technology that addresses the removal of contaminants from the fine size-fraction materials located at many of the contaminated sites. This technology has numerous advantages over the other ex-situ soil washing techniques. It requires a low capital investment, low operating costs and results in high levels of re-emplacement of the cleaned material on site. The process has the capability to clean the fine fraction (<200 mesh) of the soil resulting in a replacement of 95+% of the material back on-side, reducing the costs of disposal. The Haz-Flote{trademark} technology would expand the application of soil washing technology to heavy

  19. 77 FR 21433 - Regulated Navigation Area; Pacific Sound Resources and Lockheed Shipyard EPA Superfund Cleanup...

    Science.gov (United States)

    2012-04-10

    ... superfund cleanup remediation efforts. This RNA will prohibit activities that would disturb the seabed, such... or capped are arsenic, copper, lead, mercury, zinc, PAHs and PCBs. The metal contaminants were... installed in the designated regulated navigation area, pursuant to the remediation efforts of the U.S...

  20. Assessment of technologies for the remediation of radioactively contaminated Superfund sites

    International Nuclear Information System (INIS)

    1990-01-01

    The report is a screening evaluation of information needs for the development of generic treatability studies for the remediation of Superfund Radiation Sites on the National Priorities List (NPL). It presents a categorization of the 25 radiation sites currently proposed or listed on the NPL, and provides a rating system for evaluating technologies that may be used to remediate these sites. It also identifies gaps in site assessment and technology data and provides information about and recommendations for technology development

  1. Issuance of Final Guidance: Ecological Risk Assessment and Risk Management Principles for Superfund Sites, October 7, 1999

    Science.gov (United States)

    This guidance is intended to help Superfund risk managers make ecological risk management decisions that are based on sound science, consistent across Regions, and present a characterization of site risks that is transparent to the public.

  2. EPA RREL's mobile volume reduction unit advances soil washing at four Superfund sites

    International Nuclear Information System (INIS)

    Gaire, R.; Borst, M.

    1994-01-01

    Research testing of the US. Environmental Protection Agency (EPA) Risk Reduction Engineering Laboratory's (RREL) Volume Reduction Unit (VRU), produced data helping advance soil washing as a remedial technology for contaminated soils. Based on research at four Superfund sites, each with a different matrix of organic contaminants, EPA evaluated the soil technology and provided information to forecast realistic, full-scale remediation costs. Primarily a research tool, the VRU is RREL's mobile test unit for investigating the breadth of this technology. During a Superfund Innovative Technology Evaluation (SITE) Demonstration at Escambia Wood Treating Company Site, Pensacola, FL, the VRU treated soil contaminated with pentachlorophenol (PCP) and polynuclear aromatic hydrocarbon-laden creosote (PAH). At Montana Pole and Treatment Plant Site, Butte, MT, the VRU treated soil containing PCP mixed with diesel oil (measured as total petroleum hydrocarbons) and a trace of dioxin. At Dover Air Force Base Site, Dover, DE, the VRU treated soil containing JP-4 jet fuel, measured as TPHC. At Sand Creek Site, Commerce City, CO, the feed soil at this site was contaminated with two pesticides: heptachlor and dieldrin. Less than 10 percent of these pesticides remained in the treated coarse soil fractions

  3. 75 FR 53694 - Florida Petroleum Reprocessors Superfund Site; Davie, Broward County, FL; Notice of Settlement

    Science.gov (United States)

    2010-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY [Docket EPA-RO4-SFUND-2010-0729, FRL-9196-1] Florida Petroleum... entered into a settlement for reimbursement of past response costs concerning the Florida Petroleum... No. EPA-RO4- SFUND-2010-0729 or Site name Florida Petroleum Reprocessors Superfund Site by one of the...

  4. Superfund at work: Hazardous waste cleanup efforts nationwide, fall 1992. (CIBA-GEIGY Corporation, McIntosh, Alabama)

    International Nuclear Information System (INIS)

    1992-01-01

    On March 31, 1992, the U.S. Environmental Protection Agency (EPA) reached an agreement with Ciba-Geigy Corporation in McIntosh, Alabama to clean up soil and ground water contaminated by DDT, herbicides, and chemicals. The agreement is one of the largest private party settlements in Superfund history, valued at approximately $120 million. EPA activities at the site included: conducting preliminary contamination investigations jointly with the Alabama Environmental Health Administration, beginning in 1979; designing a multi-phased cleanup that is responsive to the complex nature of the contamination and reduces potential risk to the local population and environment; and awarding a grant to a community group to help them participate in cleanup decisions. Ciba-Geigy, like EPA, has made consistent efforts to build and maintain good relations with the community. These efforts demonstrate the increasing trend toward cooperation between industries, local communities, and EPA at Superfund sites

  5. HISTORY AND ACCOMPLISHMENTS OF THE US EPA'S SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION (SITE) MONITORING AND MEASUREMENT (MMT) PROGRAM

    Science.gov (United States)

    This manuscript presents the history and evolution of the U.S. Environmental Protection Agency's (EPA) Superfund Innovative Technology Evaluation (SITE) Monitoring and Measurement Technology (MMT) Program. This includes a discussion of how the fundamental concepts of a performanc...

  6. 77 FR 58989 - Proposed CERCLA Administrative Cost Recovery Settlement for the Buckbee-Mears Co. Superfund Site...

    Science.gov (United States)

    2012-09-25

    ... paid $150,000 attributable to the costs of marketing and selling the Properties; (b) The Bank will pay... ENVIRONMENTAL PROTECTION AGENCY [FRL-9720-7] Proposed CERCLA Administrative Cost Recovery... costs concerning the Buckbee-Mears Co. Superfund Site located in Cortland, Cortland County, New York...

  7. 77 FR 58321 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-09-20

    ... Hanover County Airport Burn Pit Superfund Site AGENCY: Environmental Protection Agency. ACTION: Final rule... Airport Burn Pit Superfund Site (Site) located in Wilmington, North Carolina, from the National Priorities... INFORMATION: The site to be deleted from the NPL is: New Hanover County Airport Burn Pit Superfund Site...

  8. On using residual risk to assess the cost effectiveness and health protectiveness of remedy selection at superfund sites

    International Nuclear Information System (INIS)

    Katsumata, Peter T.; Kastenberg, William E.

    1998-01-01

    This article examines the importance of determining residual risk and its impact on remedy selection at Superfund Sites. Within this examination, risks are assessed using probabilistic models that incorporate the uncertainty and variability of the input parameters, and utilize parameter distributions based on current and applicable site-specific data. Monte Carlo methods are used to propagate these uncertainties and variabilities through the risk calculations resulting in a distribution for the estimate of both risk and residual risk. Such an approach permits an informed decision based on a broad information base which involves considering the entire uncertainty distribution of risk rather than a point estimate for each exposure scenario. Using the probabilistic risk estimates, with current and applicable site-specific data, alternative decisions regarding cleanup are obtained for two Superfund Sites

  9. Superfund record of decision (EPA Region 4): Ciba-Geigy Site (McIntosh Plant), Washington County, McIntosh, AL. (Third remedial action), July 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 1,500-acre Ciba-Geigy site is an active chemical manufacturer in an industrial area in McIntosh, Washington County, Alabama. A wetlands area borders the site property, and part of the site lies within the floodplain of the Tombigbee River. In 1985, EPA issued a RCRA permit that included a corrective action plan requiring Ciba-Geigy to remove and treat ground water and surface water contamination at the site. Further investigations by EPA revealed 11 former waste management areas of potential contamination onsite. These areas contain a variety of waste, debris, pesticide by-products and residues. The ROD addresses a final remedy for OU4, which includes contaminated soil and sludge in former waste management Area 8 and the upper dilute ditch. The primary contaminants of concern affecting the soil, sludge, and debris are VOCs, including benzene, toluene, and xylenes; other organics, including pesticides; metals, including arsenic, chromium, and lead; and inorganics, including cyanide. The selected remedial action for the site are included

  10. Inferring invasive species abundance using removal data from management actions

    Science.gov (United States)

    Davis, Amy J.; Hooten, Mevin B.; Miller, Ryan S.; Farnsworth, Matthew L.; Lewis, Jesse S.; Moxcey, Michael; Pepin, Kim M.

    2016-01-01

    Evaluation of the progress of management programs for invasive species is crucial for demonstrating impacts to stakeholders and strategic planning of resource allocation. Estimates of abundance before and after management activities can serve as a useful metric of population management programs. However, many methods of estimating population size are too labor intensive and costly to implement, posing restrictive levels of burden on operational programs. Removal models are a reliable method for estimating abundance before and after management using data from the removal activities exclusively, thus requiring no work in addition to management. We developed a Bayesian hierarchical model to estimate abundance from removal data accounting for varying levels of effort, and used simulations to assess the conditions under which reliable population estimates are obtained. We applied this model to estimate site-specific abundance of an invasive species, feral swine (Sus scrofa), using removal data from aerial gunning in 59 site/time-frame combinations (480–19,600 acres) throughout Oklahoma and Texas, USA. Simulations showed that abundance estimates were generally accurate when effective removal rates (removal rate accounting for total effort) were above 0.40. However, when abundances were small (<50) the effective removal rate needed to accurately estimates abundances was considerably higher (0.70). Based on our post-validation method, 78% of our site/time frame estimates were accurate. To use this modeling framework it is important to have multiple removals (more than three) within a time frame during which demographic changes are minimized (i.e., a closed population; ≤3 months for feral swine). Our results show that the probability of accurately estimating abundance from this model improves with increased sampling effort (8+ flight hours across the 3-month window is best) and increased removal rate. Based on the inverse relationship between inaccurate abundances and

  11. Inferring invasive species abundance using removal data from management actions.

    Science.gov (United States)

    Davis, Amy J; Hooten, Mevin B; Miller, Ryan S; Farnsworth, Matthew L; Lewis, Jesse; Moxcey, Michael; Pepin, Kim M

    2016-10-01

    Evaluation of the progress of management programs for invasive species is crucial for demonstrating impacts to stakeholders and strategic planning of resource allocation. Estimates of abundance before and after management activities can serve as a useful metric of population management programs. However, many methods of estimating population size are too labor intensive and costly to implement, posing restrictive levels of burden on operational programs. Removal models are a reliable method for estimating abundance before and after management using data from the removal activities exclusively, thus requiring no work in addition to management. We developed a Bayesian hierarchical model to estimate abundance from removal data accounting for varying levels of effort, and used simulations to assess the conditions under which reliable population estimates are obtained. We applied this model to estimate site-specific abundance of an invasive species, feral swine (Sus scrofa), using removal data from aerial gunning in 59 site/time-frame combinations (480-19,600 acres) throughout Oklahoma and Texas, USA. Simulations showed that abundance estimates were generally accurate when effective removal rates (removal rate accounting for total effort) were above 0.40. However, when abundances were small (removal rate needed to accurately estimates abundances was considerably higher (0.70). Based on our post-validation method, 78% of our site/time frame estimates were accurate. To use this modeling framework it is important to have multiple removals (more than three) within a time frame during which demographic changes are minimized (i.e., a closed population; ≤3 months for feral swine). Our results show that the probability of accurately estimating abundance from this model improves with increased sampling effort (8+ flight hours across the 3-month window is best) and increased removal rate. Based on the inverse relationship between inaccurate abundances and inaccurate removal

  12. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  13. Region 9 NPL Sites (Superfund Sites 2013)

    Science.gov (United States)

    NPL site POINT locations for the US EPA Region 9. NPL (National Priorities List) sites are hazardous waste sites that are eligible for extensive long-term cleanup under the Superfund program. Eligibility is determined by a scoring method called Hazard Ranking System. Sites with high scores are listed on the NPL. The majority of the locations are derived from polygon centroids of digitized site boundaries. The remaining locations were generated from address geocoding and digitizing. Area covered by this data set include Arizona, California, Nevada, Hawaii, Guam, American Samoa, Northern Marianas and Trust Territories. Attributes include NPL status codes, NPL industry type codes and environmental indicators. Related table, NPL_Contaminants contains information about contaminated media types and chemicals. This is a one-to-many relate and can be related to the feature class using the relationship classes under the Feature Data Set ENVIRO_CONTAMINANT.

  14. Long-Term Groundwater Monitoring Optimization, Clare Water Supply Superfund Site, Permeable Reactive Barrier and Soil Remedy Areas, Clare, Michigan

    Science.gov (United States)

    This report contains a review of the long-term groundwater monitoring network for the Permeable Reactive Barrier (PRB) and Soil Remedy Areas at the Clare Water Supply Superfund Site in Clare, Michigan.

  15. Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act Section 120(e)(5)

    International Nuclear Information System (INIS)

    1992-05-01

    The US Department of Energy (DOE) is committed to conducting its operations. In a safe and environmentally sound manner. High priorities for the Department are identifying and correcting environmental problems at DOE facilities that resulted from past operations, and preventing environmental problems from occurring during present and future operations. In this regard, the Department is committed to the 30-year goal of cleanup of all facilities by the year 2019. DOE has issued an Order and guidance establishing policy and procedures for activities conducted under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA), and has developed a Five-Year Plan, updated annually, that integrates planing for corrective activities, environmental restoration, and waste management operations at its facilities. During Calendar Year 1991 and early 1992, DOE made significant progress in reaching agreements with regulatory entities, undertaking cleanup actions, and initiating preventive measures designed to eliminate future environmental problems. These accomplishments are described

  16. Removal action work plan for Corehole 8 in Waste Area Grouping 1 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-11-01

    The objective of the Waste Area Grouping 1 Corehole 8 Removal Action is to collect strontium-90 contaminated groundwater that is currently being discharged from existing storm drains into First Creek. 90 Sr has been identified as a major contributor to potential risk offsite. First Creek contributes about 10% of the 90 Sr contamination detected at White Oak Dam. This Removal Action Work Plan (RAWP) addresses construction of new french drains, gravity piping, and a pressure sewer pipeline to collect and pump the contaminated water to Manhole 24. The contaminated water will then flow through existing pipes to the Process Waste Treatment Plant for treatment. The proposed scope of work for this project includes the installation of approximately 480 ft of high-density polyethylene gravity piping, with cleanouts, to transport the contaminated water to a proposed pumping station. The contaminated water will then be pumped from the new pump station approximately 1,140 ft through a new force main to Manhole 24. This project will reduce the quantity of 90 Sr contaminated groundwater entering First Creek

  17. Geochemical Characteristics of TP3 Mine Wastes at the Elizabeth Copper Mine Superfund Site, Orange County, Vermont

    Science.gov (United States)

    Hammarstrom, Jane M.; Piatak, Nadine M.; Seal, Robert R.; Briggs, Paul H.; Meier, Allen L.; Muzik, Timothy L.

    2003-01-01

    Remediation of the Elizabeth mine Superfund site in the Vermont copper belt poses challenges for balancing environmental restoration goals with issues of historic preservation while adopting cost-effective strategies for site cleanup and long-term maintenance. The waste-rock pile known as TP3, at the headwaters of Copperas Brook, is especially noteworthy in this regard because it is the worst source of surface- and ground-water contamination identified to date, while also being the area of greatest historical significance. The U.S. Geological Survey (USGS) conducted a study of the historic mine-waste piles known as TP3 at the Elizabeth mine Superfund site near South Strafford, Orange County, VT. TP3 is a 12.3-acre (49,780 m2) subarea of the Elizabeth mine site. It is a focus area for historic preservation because it encompasses an early 19th century copperas works as well as waste from late 19th- and 20th century copper mining (Kierstead, 2001). Surface runoff and seeps from TP3 form the headwaters of Copperas Brook. The stream flows down a valley onto flotation tailings from 20th century copper mining operations and enters the West Branch of the Ompompanoosuc River approximately 1 kilometer downstream from the mine site. Shallow drinking water wells down gradient from TP3 exceed drinking water standards for copper and cadmium (Hathaway and others, 2001). The Elizabeth mine was listed as a Superfund site in 2001, mainly because of impacts of acid-mine drainage on the Ompompanoosuc River.

  18. 76 FR 20287 - Superfund Site, New Bedford Harbor, New Bedford, MA: Anchorage Ground and Regulated Navigation Area

    Science.gov (United States)

    2011-04-12

    ... may lead to the discovery of a significant environmental impact from this proposed rule. List of... engaged in activities associated with remediation efforts in the New Bedford Harbor Superfund Site... activity can be performed without undue risk to environmental remediation efforts. Requests for waivers...

  19. Final record of decision for remedial actions at Operable Unit 4

    International Nuclear Information System (INIS)

    1994-12-01

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. This remedial action was selected in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the extent practicable 40 Code of Federal Regulations (CFR) Part 300, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). For Operable Unit 4 at the FEMP, DOE has chosen to complete an integrated CERCLA/NEPA process. This decision was based on the longstanding interest on the part of local stakeholders to prepare an Environmental Impact Statement (EIS) on the restoration activities at the FEMP and on the recognition that the draft document was issued and public comments received. Therefore, this single document is intended to serve as DOE's Record of Decision (ROD) for Operable Unit 4 under both CERCLA and NEPA; however, it is not the intent of the DOE to make a statement on the legal applicability of NEPA to CERCLA actions

  20. Optimization Review: Bunker Hill Mining and Metallurgical Complex Superfund Site, Central Treatment Plant (CTP), Kellogg, Shoshone County, Idaho

    Science.gov (United States)

    The Bunker Hill Mining and Metallurgical Complex Superfund Site includes all areas of the Coeur d’Alene Basin where mining-related contamination occurred and encompasses a 21-square mile “Box” along Interstate 90 surrounding the former smelter complex.

  1. Arsenic Fate, Transport And Stability Study: Groundwater, Surface Water, Soil And Sediment Investigation At Fort Devens Superfund Site

    Science.gov (United States)

    A field investigation was conducted to examine the distribution of arsenic in groundwater, surface water, and sediments at the Fort Devens Superfund Site. The study area encompassed a portion of plow Shop Pond (Red Cove), which receives groundwater discharge from the aquifer und...

  2. Aquatic assessment of the Ely Copper Mine Superfund site, Vershire, Vermont

    Science.gov (United States)

    Seal, Robert R.; Kiah, Richard G.; Piatak, Nadine M.; Besser, John M.; Coles, James F.; Hammarstrom, Jane M.; Argue, Denise M.; Levitan, Denise M.; Deacon, Jeffrey R.; Ingersoll, Christopher G.

    2010-01-01

    The Ely Mine, which operated from 1821 to 1905, and its area of downstream impact constitute the Ely Copper Mine Superfund site. The site was placed on the National Priorities List in 2001. The mine comprises underground workings, foundations from historical structures, several waste-rock piles, roast beds associated with the smelting operation, and slag piles resulting from the smelting. The mine site is drained by Ely Brook, which includes several tributaries, one of which drains a series of six ponds. Ely Brook empties into Schoolhouse Brook, which flows 3.3 kilometers and joins the Ompompanoosuc River.

  3. DEMONSTRATION OF AQUAFIX AND SAPS PASSIVE MINE WATER TREATMENT TECHNOLOGIES AT SUMMITVILLE MINE SITE, INNOVATIVE TECHNOLOGY EVALUATION REPORT

    Science.gov (United States)

    As part of the Superfund Innovative Technology Evaluation (SITE) Program, the U.S. Environmental Protection Agency evaluated two passive water treatment (PWT) technologies for metals removal from acid mine drainage (AMD) at the Summitville Mine Superfund Site in southern Colorado...

  4. Toward identifying the next generation of superfund and hazardous waste site contaminants.

    Science.gov (United States)

    Ela, Wendell P; Sedlak, David L; Barlaz, Morton A; Henry, Heather F; Muir, Derek C G; Swackhamer, Deborah L; Weber, Eric J; Arnold, Robert G; Ferguson, P Lee; Field, Jennifer A; Furlong, Edward T; Giesy, John P; Halden, Rolf U; Henry, Tala; Hites, Ronald A; Hornbuckle, Keri C; Howard, Philip H; Luthy, Richard G; Meyer, Anita K; Sáez, A Eduardo; Vom Saal, Frederick S; Vulpe, Chris D; Wiesner, Mark R

    2011-01-01

    This commentary evolved from a workshop sponsored by the National Institute of Environmental Health Sciences titled "Superfund Contaminants: The Next Generation" held in Tucson, Arizona, in August 2009. All the authors were workshop participants. Our aim was to initiate a dynamic, adaptable process for identifying contaminants of emerging concern (CECs) that are likely to be found in future hazardous waste sites, and to identify the gaps in primary research that cause uncertainty in determining future hazardous waste site contaminants. Superfund-relevant CECs can be characterized by specific attributes: They are persistent, bioaccumulative, toxic, occur in large quantities, and have localized accumulation with a likelihood of exposure. Although still under development and incompletely applied, methods to quantify these attributes can assist in winnowing down the list of candidates from the universe of potential CECs. Unfortunately, significant research gaps exist in detection and quantification, environmental fate and transport, health and risk assessment, and site exploration and remediation for CECs. Addressing these gaps is prerequisite to a preventive approach to generating and managing hazardous waste sites. A need exists for a carefully considered and orchestrated expansion of programmatic and research efforts to identify, evaluate, and manage CECs of hazardous waste site relevance, including developing an evolving list of priority CECs, intensifying the identification and monitoring of likely sites of present or future accumulation of CECs, and implementing efforts that focus on a holistic approach to prevention.

  5. 78 FR 57852 - Warrior Rosin Spill Superfund Site, Holt, Tuscaloosa County, Alabama ; Notice of Settlement

    Science.gov (United States)

    2013-09-20

    ... Response, Compensation and Liability Act (CERCLA), the United States Environmental Protection Agency has... addresses costs from a fund- lead Removal Action taken by EPA at the Site. DATES: The Agency will consider...

  6. Research Implementation and Quality Assurance Project Plan: An Evaluation of Hyperspectral Remote Sensing Technologies for the Detection of Fugitive Contamination at Selected Superfund Hazardous Waste Sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2009-01-01

    This project is a research collaboration between the U.S. Environmental Protection Agency (EPA) Office of Inspector General (OIG) and the U.S. Geological Survey (USGS) Eastern Geographic Science Center (EGSC), for the purpose of evaluating the utility of hyperspectral remote sensing technology for post-closure monitoring of residual contamination at delisted and closed hazardous waste sites as defined under the Comprehensive Environmental Response Compensation and Liability Act [CERCLA (also known as 'Superfund')] of 1980 and the Superfund Amendments and Reauthorization Act (SARA) of 1986.

  7. 76 FR 24479 - In the Matter of the Taylor Lumber and Treating Superfund Site, Sheridan, Oregon, Amendment to...

    Science.gov (United States)

    2011-05-02

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9300-9] In the Matter of the Taylor Lumber and Treating... Taylor Lumber and Treating Site, which PWPO was acquiring, in exchange for several obligations related to...-553- 0705. Comments should reference the Taylor Lumber and Treating Superfund Site in Sheridan, Oregon...

  8. Superfund Record of Decision (EPA Region 9): North Hollywood/Burbank Well Field Area 1, San Fernando Valley Site, California (first remedial action), September 1987. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-24

    The North Hollywood - Burbank Well Field (NHBWF) is located within the San Fernando Valley Ground Water basin, which can provide drinking water for approximately 500,000 people residing in the San Fernando Valley and Los Angeles. In 1980 TCE and PCE were discovered in 25% of DWP's wells. In July 1981, DWP and the Southern California Association of Governments began a two-year study funded by EPA. The study revealed the occurrence of ground-water contamination plume patterns that are spreading toward the southeast. The primary contaminant of concern to the ground-water is TCE with PCE and other VOCs present. The selected remedial action for the site is ground-water pump and treatment using aeration and granular-activated-carbon - air-filtering units, with discharge to the DWP Pumping Station for chlorination and distribution. Spent carbon will be removed and replaced with fresh carbon, with the spent carbon scheduled either for disposal or regeneration. The estimated capital cost for this remedial action is $2,192,895 with present worth OandM of $2,284,105.

  9. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Cox, D. H.

    2000-01-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved

  10. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. H. Cox

    2000-07-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved.

  11. Costs of RCRA corrective action: Interim report

    International Nuclear Information System (INIS)

    Tonn, B.; Russell, M.; Hwang Ho-Ling; Goeltz, R.; Warren, J.

    1991-09-01

    This report estimates the cost of the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) for all non-federal facilities in the United States. RCRA is the federal law which regulates the treatment, storage, disposal, and recovery of hazardous waste. The 1984 amendment to RCRA, known as the Hazardous and Solid Waste Amendments, stipulates that facilities that treat, store or dispose of hazardous wastes (TSDs) must remediate situations where hazardous wastes have escaped into the environment from their solid waste management units (SWMUs). The US Environmental Protection Agency (USEPA 1990a), among others, believes that the costs of RCRA corrective action could rival the costs of SUPERFUND. Evaluated herein are costs associated with actual remedial actions. The remedial action cost estimating program developed by CH2M Hill is known as the Cost of Remedial Action Model (CORA). It provides cost estimates, in 1987 dollars, by technology used to remediate hazardous waste sites. Rules were developed to categorize each SWMU in the RTI databases by the kinds of technologies that would be used to remediate them. Results were then run through CORA using various assumptions for variable values that could not be drawn from the RTI databases and that did not have CORA supplied default values. Cost estimates were developed under several scenarios. The base case assumes a TSD and SWMU universe equal to that captured in the RTI databases, a point of compliance at the SWMU boundary with no ability to shift wastes from SWMU to SWMU, and a best-as-practical clean-up to health-based standards. 11 refs., 12 figs., 12 tabs

  12. Autolysis: mechanisms of action in the removal of devitalised tissue.

    Science.gov (United States)

    Atkin, Leanne; Rippon, Mark

    2016-11-10

    Chronic wounds affect millions of people worldwide. In the UK alone, the cost of their treatment is estimated to be between £4.5bn and £5.1bn. The implementation of wound-bed preparation strategies remove the barriers to healing and wound debridement is a key component in preparing the wound bed for wound progression. This article aims to review one of the several debridement methods available to clinicians: autolytic debridement. Autolysis (i.e. autolytic debridement) uses the body's own enzymatic mechanisms to remove devitalised tissue in order to remove the barriers to healing. This review aims to provide clinicians working in wound care with a better understanding of the mechanisms and implications of autolytic debridement.

  13. Investigation of the removing process of cathode material in micro-EDM using an atomistic-continuum model

    International Nuclear Information System (INIS)

    Guo, Jianwen; Zhang, Guojun; Huang, Yu; Ming, Wuyi; Liu, Min; Huang, Hao

    2014-01-01

    Highlights: • An atomistic-continuum computational simulation model for single-discharge micro-EDM process of Cu cathode is constructed. • Cathode material is removed mainly in the form of single atoms or small clusters in micro-EDM. • Electric action leads to the formation of peaks on the surface of crater. • Removing process of cathode material under the hybrid action combining the thermal action and the electric action is studied, and the strength of either action needed for material to remove is much reduced. - Abstract: In micro-electrical discharge machining (micro-EDM), the discharge duration is ultra-short, and both the electric action and the thermal action by the discharge channel play important roles in the removing process of cathode material. However, in most researches on the machining mechanism of micro-EDM, only the thermal action is concerned. In this article, a combined atomistic-continuum modeling method in which the two-temperature model and the molecular dynamics simulation model are integrated is used to construct the simulation model for cathode in single-discharge micro-EDM process. With this simulation model, removing processes of Cu cathode material in micro-EDM under pure thermal action, pure electric action and the combination of them are investigated in a simulative way. By analyzing evolutions of temperature, stress and micro-structure of material as well as the dynamical behaviors of material in the removing process, mechanisms of the cathode material removal and crater formation are revealed. In addition, the removing process of cathode material under the combination of pure thermal action and pure electric action is compared with those under the two pure actions respectively to analyze the interactive effect between the thermal action and the electric action

  14. Graphic products used in the evaluation of traditional and emerging remote sensing technologies for the detection of fugitive contamination at selected superfund hazardous waste sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2011-01-01

    This report presents the overhead imagery and field sampling results used to prepare U.S. Geological Survey Open-File Report 2011-1050, 'Evaluation of Traditional and Emerging Remote Sensing Technologies for the Detection of Fugitive Contamination at Selected Superfund Hazardous Waste Sites'. These graphic products were used in the evaluation of remote sensing technology in postclosure monitoring of hazardous waste sites and represent an ongoing research effort. Soil sampling results presented here were accomplished with field portable x-ray fluoresence (XRF) technology and are used as screening tools only representing the current conditions of metals and other contaminants at selected Superfund hazardous waste sites.

  15. An evaluation of traditional and emerging remote sensing technologies for the detection of fugitive contamination at selected Superfund hazardous waste sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2011-01-01

    This report represents a remote sensing research effort conducted by the U.S. Geological Survey in cooperation with the U.S. Environmental Protection Agency (EPA) for the EPA Office of Inspector General. The objective of this investigation was to explore the efficacy of remote sensing as a technology for postclosure monitoring of hazardous waste sites as defined under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (Public Law 96-510, 42 U.S.C. §9601 et seq.), also known as \\"Superfund.\\" Five delisted Superfund sites in Maryland and Virginia were imaged with a hyperspectral sensor and visited for collection of soil, water, and spectral samples and inspection of general site conditions. This report evaluates traditional and hyperspectral imagery and field spectroscopic measurement techniques in the characterization and analysis of fugitive (anthropogenic, uncontrolled) contamination at previously remediated hazardous waste disposal sites.

  16. 40 CFR 35.6335 - Property management standards.

    Science.gov (United States)

    2010-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Personal Property Requirements Under A Cooperative Agreement § 35.6335 Property management... the property; (5) Provisions for financial control and accounting in the financial management system...

  17. Contingency analysis modeling for superfund sites and other sources. Final report

    International Nuclear Information System (INIS)

    Christensen, D.; Kaiser, G.D.

    1993-01-01

    The report provides information on contingency modeling for a wide range of different accidental release scenarios of hazardous air pollutants that might take place at Superfund and other sites. The scenarios are used to illustrate how atmospheric dispersion models, including dense gas models, should be applied. Particular emphasis is made on the input data that is needed for proper applications of models. Flow charts direct the user to specific sections where various scenarios are discussed. A check list of items that should be discussed before running the model is provided. Several examples are provided to specifically show how to apply the models so as to produce a credible analysis for a particular release scenario

  18. Photosensitized herbicidal action

    Energy Technology Data Exchange (ETDEWEB)

    Zweig, A; Nachtigall, G W [American Cyanamid Co., Stamford, Conn.

    1975-12-01

    The herbicidal action produced by the colorless hydrocarbon fluoranthene sprayed on the leaves of growing plants did not occur when uv radiation was removed from the light to which the plants are exposed. If the uv component of the light under which the plants were grown was augmented, the herbicidal effect of fluoranthene was increased. The mechanism of this photodynamic action is discussed.

  19. 77 FR 8253 - Notice of Proposed Settlement Agreement and Opportunity for Public Comment: Hidden Lane Landfill...

    Science.gov (United States)

    2012-02-14

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9631-3] Notice of Proposed Settlement Agreement and Opportunity for Public Comment: Hidden Lane Landfill Superfund Site ACTION: Notice. SUMMARY: In accordance... (``DOJ'') on behalf of EPA, in connection with the Hidden Lane Landfill Superfund Site, Sterling, Loudoun...

  20. Ethical considerations related to participation and partnership: an investigation of stakeholders' perceptions of an action-research project on user fee removal for the poorest in Burkina Faso.

    Science.gov (United States)

    Hunt, Matthew R; Gogognon, Patrick; Ridde, Valéry

    2014-02-20

    Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. This investigation of the Ouargaye project serves to illuminate the distinctive ethical terrain of a participatory public

  1. Pilot Project to Optimize Ground Water Remediation Systems at RCRA Corrective Action Facilities: Summary Report and Lessons Learned

    Science.gov (United States)

    Based on previous success with conducting independent optimization evaluations at Fund-lead pump and treat sites (i.e., those sites with pump and treat systems funded and managed by Superfund and the States), the EPA Office of Superfund .....

  2. Final Report; Arsenic Fate, Transport and Stability Study; Groundwater, Surface Water, Soil And Sediment Investigation, Fort Devens Superfund Site, Devens, Massachusetts

    Science.gov (United States)

    This document presents results from the Fiscal Years 2006-2008 field investigation at the Fort Devens Superfund Site, Operable Unit 1 (Shepley's Hill Landfill) to fulfill the research objectives outlined in the proposal entitled, 'Fate and Transport of Arsenic in an Urban, Milita...

  3. 76 FR 76048 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-12-06

    ..., mercury, and selenium) and one semi-volatile organic compound (SVOC, pentachlorophenol) exceeded their... Marine of Port Arthur Superfund Site AGENCY: Environmental Protection Agency. ACTION: Direct final rule... Deletion of the State Marine of Port Arthur (SMPA) Superfund Site located in Port Arthur, Texas (Jefferson...

  4. Ethical Issues in Using Children's Blood Lead Levels as a Remedial Action Objective

    Science.gov (United States)

    Evans, Emily Lorraine

    2011-01-01

    The Environmental Protection Agency measures the success or failure of Superfund site remediation efforts against remedial action objectives (RAOs). RAOs are frequently based on environmental contaminant concentrations, but with lead exposure, blood lead levels from the population at risk are often used. Although childhood lead screening is an important public health tool, an RAO based on child blood lead levels raises ethical concerns: public health efforts that are more reactive than preventive, a blood lead standard (10 μg/dL) that may not be fully protective, the use of a measure whose validity and reliability may be easily compromised, and exacerbation of environmental injustice and systematic disadvantages. The example of Bunker Hill mine, Kellogg, Idaho, allowed an examination of these ethical concerns. PMID:21836120

  5. Superfund Record of Decision (EPA Region 2): Montclair/West Orange, Radium, NJ. (First Remedial Action), June 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Montclair/West Orange Radium site is in the towns of Montclair and West Orange in Essex County, New Jersey. The soil at the site is contaminated with radioactive-waste materials suspected to have originated from radium processing or utilization facilities located nearby during the early 1900s. Temporary radon ventilation systems and gamma-radiation shielding have been installed and maintained by EPA and the State to reduce indoor exposures. The primary contaminant of concern affecting the soil and structures is radium 226 which decays to radon gas. The selected remedial action for the site includes excavation of approximately 41,000 cu yd of highly contaminated soil and an unspecified amount of debris followed by offsite disposal; installation and maintenance of indoor engineering controls at less contaminated properties; environmental monitoring to ensure remedy effectiveness; and continuation of a treatment technology study for future actions. EPA deferred a final continuation of a treatment-technology study for future action

  6. TECHNOLOGY EVALUATION REPORT, SITE PROGRAM DEMONSTRATION TEST: SHIRCO PILOT-SCALE INFRARED INCINERATION SYSTEM ROSE TOWNSHIP DEMODE ROAD SUPERFUND SITE - VOLUME II

    Science.gov (United States)

    The performance of the Shirco pilot-scale infrared thermal destruction system has been evaluated at the Rose Township, Demode Road Superfund Site and is presented in the report. The waste tested consisted of solvents, organics and heavy metals in an illegal dump site. Volume I gi...

  7. Expedited remedial action -- A promising opportunity at your doorstep

    Energy Technology Data Exchange (ETDEWEB)

    Newman, E.R.

    1996-12-31

    The Expedited Remedial Action Program or ERAP carries great promise and is limited to no more than 30 sites, there are a number of slots now available, and the legislature will soon be considering a reauthorization of the full state Superfund program, which expires in June 1998, to reportedly be based to a great extent on the ERAP model. The ERAP provides for: (1) The early identification of fair and equitable shares of liability, including an orphan share, where appropriate, to be paid by the state; (2) The elimination of all joint and several liability; (3) Cleanup levels and remedies based on the foreseeable planned use of the site; (4) Site specific risk assessments based on the latest risk assessment protocols; (5) Use of an arbitrator to quickly resolve all significant liability and technical disputes; and (6) Broad and timely releases from future liability upon completion of cleanup.

  8. Combined Activity of Colloid Nanosilver and Zataria Multiflora Boiss Essential Oil-Mechanism of Action and Biofilm Removal Activity

    Directory of Open Access Journals (Sweden)

    Maryam Shirdel

    2017-12-01

    Full Text Available Purpose: The aim of this study was to investigate antimicrobial and biofilm removal potential of Zataria multiflora essential oil (ZEO and silver nanoparticle (SNP alone and in combination on Staphylococcus aureus and Salmonella Typhimurium and evaluate the mechanism of action. Methods: The minimum inhibitory concentration (MIC, and optimal inhibitory combination (OIC of ZEO and SNP were determined according to fractional inhibitory concentration (FIC method. Biofilm removal potential and leakage pattern of 260-nm absorbing material from the bacterial cell during exposure to the compounds were also investigated. Results: MICs of SNP for both bacteria were the same as 25 μg/ mL. The MICs and MBCs values of ZEO were 2500 and 1250 μg/mL, respectively. The most effective OIC value for SNP and ZEO against Salm. Typhimurium and Staph. aureus were 12.5, 625 and 0.78, 1250 μg/ mL, respectively. ZEO and SNP at MIC and OIC concentrations represented a strong removal ability (>70% on biofilm. Moreover, ZEO at MIC and OIC concentrations did a 6-log reduction of primary inoculated bacteria during 15 min contact time. The effect of ZEO on the loss of 260-nm material from the cell was faster than SNP during 15 and 60 min. Conclusion: Combination of ZEO and SNP had significant sanitizing activity on examined bacteria which may be suitable for disinfecting the surfaces.

  9. Superfund Record of Decision (EPA Region 2): Glen Ridge Radium, NJ. (First Remedial Action), June 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Glen Ridge Radium site is in the Borough of Glen Ridge and the town of East Orange in Essex County, New Jersey. The soil at the site is contaminated to varying degrees with radioactive waste materials suspected to have originated from radium processing or utilization facilities located nearby during the early 1900s. Temporary radon ventilation systems and gamma-radiation shielding have been installed and maintained by EPA and the State to reduce indoor exposures. The primary contaminant of concern affecting the soil and structures in radium 226 which delays to radon gas. The selected remedial action includes excavation of approximately 41,000 cu yd of highly contaminated soil and an unspecified amount of debris followed by offsite disposal; installation and maintenance of indoor engineering controls at less contaminated properties; environmental monitoring to ensure remedy effectiveness; and continuation of a treatment technology study for future actions

  10. Field grouting summary report on the WAG seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1: Text

    International Nuclear Information System (INIS)

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of Strontium 90 ( 90 Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70% of the 90 Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10 -6 cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground

  11. Briefing paper -- Remedial Action Assessment System

    International Nuclear Information System (INIS)

    Buelt, J.L.

    1990-04-01

    Congress has mandated a more comprehensive management of hazardous wastes with the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or ''Superfund'') and the Superfund Amendment and Reauthorization Act (SARA). This mandate includes restoration of disposal sites contaminated through past disposal practices. This mandate applies to facilities operated for and by the Department of Energy (DOE), just as it does to industrial and other institutions. To help implement the CERCLA/SARA remedial investigation and feasibility study (RI/FS) process in a consistent, timely, and cost-effective manner, a methodology needs to be developed that will allow definition, sorting, and screening of remediation technologies for each operable unit (waste site). This need is stated specifically in Section 2.2.2.1 of the October 1989 Applied Research, Development, Demonstration, Testing, and Evaluation (RDDT ampersand E) Plan of the DOE. This Briefing Paper is prepared to respond to this need. 1 fig

  12. Case history: Vertical barrier wall system for Superfund Site

    International Nuclear Information System (INIS)

    Koelling, M.A.; Kovac, C.P.; Norris, J.E.

    1997-01-01

    Design considerations and construction aspects are presented for the installation of a vertical barrier wall system for the Boeing Company at a Superfund Site near Seattle, WA. The construction was performed during 1996. The vertical barrier wall system included: (1) a soil-bentonite (SB) slurry wall, approximately 670 meters (2200 feet) in length, ranging from 12 to 21 meters (40 to 70 feet) in depth; (2) expansion of a cover system over the area enclosed by the SB wall; and (3) surface drainage improvements. Design and construction of the system addressed requirements of a Consent Decree for the site issued in 1993. The paper discusses the development of the design to meet remedial performance goals of preventing migration of contaminants in the soil/groundwater system and aiding aquifer restoration. Secondly, the paper details installation of the SB wall, highlighting the more significant construction issues, which included excavation of the wall through glacially deposited cobbles/boulders/till as well as addressing the severe elevation changes along the wall alignment. Thirdly, the paper presents Quality Assurance (QA) monitoring and testing performed during the construction phase

  13. Space Debris Removal: A Game Theoretic Analysis

    Directory of Open Access Journals (Sweden)

    Richard Klima

    2016-08-01

    Full Text Available We analyse active space debris removal efforts from a strategic, game-theoretical perspective. Space debris is non-manoeuvrable, human-made objects orbiting Earth, which pose a significant threat to operational spacecraft. Active debris removal missions have been considered and investigated by different space agencies with the goal to protect valuable assets present in strategic orbital environments. An active debris removal mission is costly, but has a positive effect for all satellites in the same orbital band. This leads to a dilemma: each agency is faced with the choice between the individually costly action of debris removal, which has a positive impact on all players; or wait and hope that others jump in and do the ‘dirty’ work. The risk of the latter action is that, if everyone waits, the joint outcome will be catastrophic, leading to what in game theory is referred to as the ‘tragedy of the commons’. We introduce and thoroughly analyse this dilemma using empirical game theory and a space debris simulator. We consider two- and three-player settings, investigate the strategic properties and equilibria of the game and find that the cost/benefit ratio of debris removal strongly affects the game dynamics.

  14. Occurrences and fate of DDT principal isomers/metabolites, DDA, and o,p'-DDD enantiomers in fish, sediment and water at a DDT-impacted Superfund site.

    Science.gov (United States)

    Garrison, A W; Cyterski, M; Roberts, K D; Burdette, D; Williamson, J; Avants, J K

    2014-11-01

    In the 1950s and 60s, discharges from a DDT manufacturing plant contaminated a tributary system of the Tennessee River near Huntsville, Alabama, USA. Regulatory action resulted in declaring the area a Superfund site which required remediation and extensive monitoring. Monitoring data collected from 1988, after remediation, through 2011 showed annual decreases approximating first-order decay in concentrations of total DDT and its six principal congeners (p,p'-DDT, o,p'-DDT, p,p'-DDD, o,p'-DDD, p,p'-DDE and o,p'-DDE) in filets from three species of fish. As of 2013, these concentrations met the regulatory requirements of 5 mg/kg or less total DDT for each fish tested. The enantiomer fractions (EF) of chiral o,p'-DDD in smallmouth buffalo and channel catfish were always below 0.5, indicating preferential decay of the (+)-enantiomer of this congener; this EF did not change significantly over 15 years. The often-neglected DDT metabolite p,p'-DDA was found at a concentration of about 20 μg/l in the ecosystem water. Published by Elsevier Ltd.

  15. Enforcement under SACM: Interim guidance. Volume 1, Number 3, December 1992. Intermittent bulletin

    International Nuclear Information System (INIS)

    1992-12-01

    The purpose of the Superfund Accelerated Cleanup Model (SACM) is to make Superfund cleanups more timely and efficient. This will be accomplished through more focus on the front end of the process and better integration of all Superfund program components. The bulletin discusses major enforcement areas affected by SACM including: The timing and methodology of PRP searches; timing and content of negotiations with PRPs; notice letters; consultations for early actions; state involvement in enforcement; de minimis settlements; the availability and adequacy of administrative records; and cost recovery and cost documentation

  16. The atmosphere as a source/sink of polychlorinated biphenyls to/from the Lower Duwamish Waterway Superfund site

    International Nuclear Information System (INIS)

    Apell, Jennifer N.; Gschwend, Philip M.

    2017-01-01

    Waterbodies polluted with polychlorinated biphenyls (PCBs) may cause the air in the surrounding area to become PCB-contaminated. Conversely, when a waterbody is located in or near an urban area, the deposition of atmospheric PCBs may act as a low-level, ongoing source of PCB contamination to that water. Distinguishing these situations is necessary to be protective of human populations and to guide efforts seeking to cleanup such aquatic ecosystems. To assess the situation at the Lower Duwamish Waterway (LDW) Superfund site, low-density polyethylene passive samplers were deployed in the summer of 2015 to quantify freely dissolved water and gaseous air concentrations of PCBs thereby enabling estimates of the direction and magnitude of air-water exchange of PCB congeners. For the sum of the 27 PCB congeners, average concentrations were 220 pg/m 3 (95% C.I.: 80–610) in the air and 320 pg/L (95% C.I.: 110–960) in the water. The sum of air-water exchange fluxes of these PCB congeners was estimated to be 68 ng/m 2 /day (95% C.I.: 30–148) into the lower atmosphere, contrasting with the reported wet and dry depositional flux of only 5.5 ng/m 2 /day (95% C.I.: 1–38) from the air into the water. Therefore, the atmosphere was ultimately a sink of PCBs from the LDW Superfund site, at least under 2015 summertime conditions. However, we conclude that air-water exchange of PCBs is likely only a minor sink of PCBs from the LDW and only a minor source of contamination to the region's local atmosphere. - Highlights: • Passive samplers were used to estimate air and water concentrations. • At this site, PCBs were being transported from the water into the local atmosphere. • Air-water exchange was likely only a minor sink of PCBs for the LDW site. • The LDW was likely only a minor source of PCBs to the local atmosphere. - Air-water exchange of PCBs from the LDW Superfund site, calculated using passive sampler data, was determined to be a minor sink of PCBs from

  17. Establishing a regulatory framework for a RCRA corrective action program

    International Nuclear Information System (INIS)

    Krueger, J.W.

    1989-01-01

    Recently, the environmental community has become keenly aware of problems associated with integration of the demanding regulations that apply to environmental restoration activities. Once can not attend an EPA-sponsored conference on Superfund without hearing questions concerning the Resource, Conservation, and Recovery Act (RCRA) and the applicability of the National Contingency Plan (NCP) to sites that do not qualify for the National Priorities List (NPL). In particular, the U.S. Department of Energy (DOE) has been greatly criticized for its inability to define a comprehensive approach for cleaning up its hazardous waste sites. This article presents two decision flowcharts designed to resolve some of this confusion for DOE. The RCRA/CERCLA integration diagram can help the environmental manager determine which law applies and under what conditions, and the RCRA corrective action decision flowchart can guide the manager in determining which specific sections of RCRA apply to a RCRA-lead environmental restoration program

  18. Action Memorandum for Decommissioning of TAN-607 Hot Shop Area

    Energy Technology Data Exchange (ETDEWEB)

    M. A. Pinzel

    2007-05-01

    The Department of Energy is documenting the selection of an alternative for the TAN-607 Hot Shop Area using a Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action (NTCRA). The scope of the removal action is limited to TAN-607 Hot Shop Area. An engineering evaluation/cost analysis (EE/CA) has assisted the Department of Energy Idaho Operations Office in identifuomg the most effective method for performing the decommissioning of this structure whose mission has ended. TAN-607 Hot Shop Area is located at Test Area North Technical Support Facility within the Idaho National Laboratory Site. The selected alternative consists of demolishing the TAN-607 aboveground structures and components, removing belowground noninert components (e.g. wood products), and removing the radiologically contaminated debris that does not meet remedial action objectives (RAOs), as defined in the Record of Decision Amendment for the V-Tanks and Explanation of Significant Differences for the PM-2A Tanks at Test Area North, Operable Unit 1-10.

  19. Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund, Section 104(k); and CERCLA Section 104(d); ‘‘ ‘Discounted Loans’ Under Brownfields Revolving Loan Fund Grants’

    Science.gov (United States)

    Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund, Section 104(k); and CERCLA Section 104(d); ‘‘ ‘Discounted Loans’ Under Brownfields Revolving Loan Fund Grants’`

  20. New atraumatic easy removal technique for permanently cemented crown

    Directory of Open Access Journals (Sweden)

    Pravinkumar G Patil

    2012-01-01

    Full Text Available Removal of a permanently cemented crown or fixed partial denture is a cumbersome procedure for a prosthodontist, especially when there is no purchase point available to remove it. The technique described in this article consists of sectioning of a crown on facial surface followed by removal of the crown with orthodontic plier. This technique does not damage the gingival/periodontal tissues or underlying tooth structure as the crown need not to be removed with jerky back-action force.

  1. Recycling abandoned lead battery sites

    International Nuclear Information System (INIS)

    Montgomery, A.H.

    1993-01-01

    In the past, automobile batteries were recycled principally for their lead content. The waste generated at battery wrecking facilities consisted of spent acid, crushed casings (ebonite and plastic), and where secondary smelting was involved, matte, slag, and carbon from the smelting process. These waste products were generally disposed in an on-site in a landfill or stored in piles. If the facility shut down because further commercial operations were not financially viable, the waste piles remained to be addressed at a later date through remedial action or reclamation programs. There are many of these facilities in the US. Nationally, about 28 sites have been discovered by the US Environmental Protection Agency (EPA) under the Superfund program and are under investigation or administrative orders for remedial action. A major remediation effort is now underway at the Gould Superfund Site in Portland, Oregon, which was operated as a secondary smelting facility between 1949 and 1981. This paper describes the nature of the contamination at the Gould site and the work conducted by Canonie Environmental Services Corp. (Canonie) to develop a process which would treat the waste from battery wrecking operations and produce revenue generating recyclable products while removing the source contamination (lead) from the site. The full-scale commercial plant is now operating and is expected to achieve a throughput rate of between 200 and 250 tons per day in the coming weeks

  2. Bear Creek Valley Floodplain hot spot removal early action characterization field data summary report, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-04-01

    This report summarizes the field and laboratory efforts as a result of the Bear Creek Floodplain Hot Spot Removal Project Early Action. The purpose of this project was to collect data necessary to assess contaminant levels in the Bear Creek Valley Floodplain and evaluate the risk posed by the sites. This report provides information on the background of the site, characterization of site and field activities, results of field and laboratory data collected, extent and distribution of contamination, and an assessment of the future risk posed by the site

  3. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  4. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  5. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    T. M. Fitzmaurice

    2000-01-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection[NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site

  6. Temporal Chemical Data for Sediment, Water, and Biological Samples from the Lava Cap Mine Superfund Site, Nevada County, California-2006-2008

    Science.gov (United States)

    Foster, Andrea L.; Ona-Nguema, Georges; Tufano, Kate; White, Richard III

    2010-01-01

    The Lava Cap Mine is located about 6 km east of the city of Grass Valley, Nevada County, California, at an elevation of about 900 m. Gold was hosted in quartz-carbonate veins typical of the Sierran Gold Belt, but the gold grain size was smaller and the abundance of sulfide minerals higher than in typical deposits. The vein system was discovered in 1860, but production was sporadic until the 1930s when two smaller operations on the site were consolidated, a flotation mill was built, and a 100-foot deep adit was driven to facilitate drainage and removal of water from the mine workings, which extended to 366 m. Peak production at the Lava Cap occurred between 1934 and 1943, when about 90,000 tons of ore per year were processed. To facilitate removal of the gold and accessory sulfide minerals, the ore was crushed to a very fine sand or silt grain size for processing. Mining operations at Lava Cap ceased in June 1943 due to War Production Board Order L-208 and did not resume after the end of World War II. Two tailings retention structures were built at the Lava Cap Mine. The first was a log dam located about 0.4 km below the flotation mill on Little Clipper Creek, and the second, built in 1938, was a larger earth fill and rip-rap structure constructed about 2 km downstream, which formed the water body now called Lost Lake. The log dam failed during a storm that began on December 31, 1996, and continued into January 1997; an estimated 8,000-10,000 m3 of tailings were released into Little Clipper Creek during this event. Most of the fine tailings were deposited in Lost Lake, dramatically increasing its turbidity and resulting in a temporary 1-1.5 m rise in lake level due to debris blocking the dam spillway. When the blockage was cleared, the lake level quickly lowered, leaving a ?bathtub ring? of very fine tailings deposited substantially above the water line. The U.S. Environmental Protection Agency (EPA) initiated emergency action in late 1997 at the mine site to reduce

  7. DOJ News Release: New York Man Ordered to Pay Over $400,000 in Restitution and Fines for Role in Kickback Scheme at New Jersey Superfund Sites

    Science.gov (United States)

    WASHINGTON, D.C. – An Amherst, New York, man was ordered to pay over $400,000 in restitution and fines and placed on five years’ probation for his role in a kickback scheme at the Federal Creosote and Diamond Alkali Superfund sites in New Jersey.

  8. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  9. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report

  10. An innovative carbonate coprecipitation process for the removal of zinc and manganese from mining impacted waters

    Science.gov (United States)

    Sibrell, P.L.; Chambers, M.A.; Deaguero, A.L.; Wildeman, T.R.; Reisman, D.J.

    2007-01-01

    Although mine drainage is usually thought of as acidic, there are many cases where the water is of neutral pH, but still contains metal species that can be harmful to human or aquatic animal health, such as manganese (Mn) and zinc (Zn). Typical treatment of mine drainage waters involves pH adjustment, but this often results in excessive sludge formation and removal of nontoxic species such as magnesium and calcium. Theoretical consideration of the stability of metal carbonate species suggests that the target metals could be removed from solution by coprecipitation with calcium carbonate. The U.S. Geological Survey has developed a limestone-based process for remediation of acid mine drainage that increases calcium carbonate saturation. This treatment could then be coupled with carbonate coprecipitation as an innovative method for removal of toxic metals from circumneutral mine drainage waters. The new process was termed the carbonate coprecipitation (CCP) process. The CCP process was tested at the laboratory scale using a synthetic mine water containing 50 mg/L each of Mn and Zn. Best results showed over 95% removal of both Mn and Zn in less than 2 h of contact in a limestone channel. The process was then tested on a sample of water from the Palmerton zinc superfund site, near Palmerton, Pennsylvania, containing over 300 mg/L Zn and 60 mg/L Mn. Treatment of this water resulted in removal of over 95% of the Zn and 40% of the Mn in the limestone channel configuration. Because of the potential economic advantages of the CCP process, further research is recommended for refinement of the process for the Palmerton water and for application to other mining impacted waters as well. ?? Mary Ann Liebert, Inc.

  11. Removal site evaluation report on Building 7602 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This removal site evaluation report for Building 7602 at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the facility pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and whether remedial site evaluations or removal actions are, therefore, required. The scope of the project included (1) a search for, and review of, readily available historical records regarding operations and use of the facility (including hazardous substance usage and existing contamination); (2) interviews with facility personnel concerning current and past practices; and (3) a brief walk-through to visually inspect the facility and identify existing hazard areas requiring maintenance actions, removal actions, or remedial evaluation. The results of the removal site evaluation indicate that areas associated with Building 7602 pose no imminent hazards requiring maintenance actions. Adequate engineering and administrative controls are in place and enforced within the facility to ensure worker and environmental protection. Current actions that are being taken to prevent further release of contamination and ensure worker safety within Building 7602 are considered adequate until decontamination and decommissioning activities begin. Given the current status and condition of Building 7602, this removal site evaluation is considered complete and terminated

  12. Environmental compliance at U.S. Department of Energy FUSRAP (Formerly Utilized Sites Remedial Action Program) sites

    International Nuclear Information System (INIS)

    Liedle, S.D.; Clemens, B.W.

    1988-01-01

    With the promulgation of the Superfund Amendments and Reauthorization Act (SARA), federal facilities were required to comply with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) in the same manner as any non-government entity. This presented challenges for the Department of Energy (DOE) and other federal agencies involved in remedial action work because there are many requirements under SARA that overlap other laws requiring DOE compliance, e.g., the National Environmental Policy Act (NEPA). This paper outlines the options developed to comply with CERCLA and NEPA as part of active, multi-site remedial action program. The program, the Formerly Utilized Sites Remedial Action Program (FUSRAP), was developed to identify, clean up, or control sites containing residual radioactive or chemical contamination as a result of the nation's early development of nuclear power. During the Manhattan Project, uranium was extracted from ores and resulted in mill concentrates, purified metals, and waste products that were transported for use or disposal at other locations. Figure 1 shows the steps for producing uranium metal during the Manhattan Project. As a result of these activities materials, equipment, buildings, and land became contaminated, primarily with naturally occurring radionuclides. Currently, FUSRAP includes 29 sites; three are on the Environmental Protection Agency's (EPA's) National Priorities List (NPL) of hazardous waste sites

  13. Waste management plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This waste management plan defines the procedures for control and management of waste generated as a result of the removal action of the YS-86O Firing Ranges site at the Oak Ridge Y-12 Plant. This document includes plan objectives; remediation activities; key personnel; waste generation activities; and waste treatment, storage, transportation, and disposal. Methods of control and characterization of waste generated as a result of remediation activities will be within the guidelines and procedures outlined herein. ENTECH personnel will make every effort when conducting remediation and decontamination activities to minimize the amount of generated waste

  14. New photocatalytic process provides 99.9+% reduction of VOC at Superfund site

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-03-01

    A new photocatalytic process, dubbed the A-I-R-2000 Process, is described. The process is said to offer marked economic advantages, while providing consistent 99.9+% reduction of volatile organic compounds (VOCs) from soil vapours and groundwater at the Stamina Mills Superfund site in North Smithfield, Rhode Island. The A-I-R-2000 process has been developed by KSE Inc., of Amherst, Massachusetts, and has been licensed exclusively worldwide to Trojan Technologies, Inc., of London, Ontario. The process consists essentially of adsorption of VOCs onto a UV light-activated proprietary catalysts, for breakdown to carbon dioxide and water, and also to hydrochloric acid and a small amount of chlorine gas when the VOCs are chlorinated. With a maximum internal operating temperature of 125 degrees F, it is a low-energy system when compared to other catalytic technologies that feature thermal catalytic equipment. 1 photo.

  15. TREATABILITY STUDY REPORT OF GREEN MOUNTAIN LABORATORIES, INC.'S BIOREMEDIATION PROCESS, TREATMENT OF PCB CONTAMINATED SOILS, AT BEEDE WASTE OIL/CASH ENERGY SUPERFUND SITE, PLAISTOW, NEW HAMPSHIRE

    Science.gov (United States)

    In 1998, Green Mountain Laboratories, Inc. (GML) and the USEPA agreed to carry out a Superfund Innovative Technology Evaluation (SITE) project to evaluate the effectiveness of GML's Bioremediation Process for the treatment of PCB contaminated soils at the Beede Waste Oil/Cash Ene...

  16. Corrective Action Decision Document/Closure Report for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Grant Evenson

    2010-04-01

    leach pit chamber and leach rock. The contamination present at CAS 06-05-03 within the leach pit was not feasible to remove. •The surface and subsurface soils within and surrounding the septic system at CAS 06-05-04 contained PCB concentrations above the FAL of 0.74 mg/kg. The lateral and vertical extent of COCs was determined for this CAS. Contaminated soils were removed up to within 18 ft of the building. The remaining contamination is confined to subsurface soils adjacent to and beneath Building CP-162 and was not feasible to remove. •The solid materials within the septic tank and soils immediately surrounding the inlet end of the tank at CAS 06-59-03 contained benzo(a)pyrene above the FAL of 0.21 mg/kg. The soils, tank contents, and tank were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. •The solids contained within the septic tank and inlet pipe at CAS 06-59-05 contained the following contaminants above their respective FALs: PCBs, arsenic, lead, benzo(a)pyrene, and pesticides. The tank and inlet pipe contents were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following corrective action recommendations: •No further action for CASs 03-51-01, 06-04-02, and 06-59-04, as no contaminants of potential concern were present that exceed FALs. •Closure in place for CAS 06-05-03 under a corrective action with a use restriction (UR) for remaining PCB- and arsenic-impacted potential source material (PSM). The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and NNSA/NSO CAU/CAS files. •Closure in place for CAS 06-05-04 under a corrective action with a UR for remaining PCBs in soil adjacent to and beneath Building CP-162. The UR form and map have been filed in the NNSA/NSO Facility Information Management

  17. Improved continuum limit lattice action for QCD with Wilson fermions

    International Nuclear Information System (INIS)

    Sheikholeslami, B.; Wohlert, R.

    1985-03-01

    Two possible ways of extending Symanzik's improvement programme to lattice fermions namely improvement to first and second order in the lattice spacing 'a' are discussed. The corresponding lattice actions for fermions are constructed and tree level improvement conditions are derived by considering classical improvement. The concept of on shell improvement is generalized to the lattice fermions studied here and the free parameters are determined for O(a) and O(a 2 ) on shell improved actions to all orders of perturbation theory. No evidence is found that the complicated structure of the O(a 2 ) on shell improved action especially the arising fermion contact terms can be removed beyond tree level. The effect of terms in the action that explicitly break chiral symmetry and therefore remove the phenomenon of species doubling are investigated by considering the energy momentum relations of the arising tree level improved actions. Our main result is that the O(a) improved action is a slightly modified Wilson fermion action which can still be written with only nearest neighbour fermion interactions. (orig.)

  18. Closure report for housekeeping category, Corrective Action Unit 348, Nevada Test Site

    International Nuclear Information System (INIS)

    1998-01-01

    This Closure Report summarizes the corrective actions which were completed at twelve Corrective Action Sites within Corrective Action Unit 348 at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms

  19. Closure report for housekeeping category, Corrective Action Unit 347, Nevada Test Site

    International Nuclear Information System (INIS)

    1998-01-01

    This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 347 at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms

  20. Superfund record of decision (EPA Region 10): Teledyne Wah Chang, Albany, OR. (first remedial action), December 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Teledyne Wah Chang (TWC) site, in Millersburg, Oregon, is an active plant used to produce nonferrous metals and products. The site consists of a 110-acre plant site, which contains the plant's former sludge ponds, and a 115-acre farm site, which contains four active wastewater sludge ponds. Portions of the TWC site are within the Willamette River's 100- and 500-year flood plain. The Wah Chang Corporation began operating a U.S. Bureau of Mines zirconium metal sponge pilot plant under contract with the U.S. Atomic Energy Commission in 1956. Additional facilities were subsequently built near the plant beginning in 1957 to produce nonferrous metals and products. The Lower River Solids Pond (LRSP) and Schmidt Lake sludge pond, which stored wastewater generated from the plant operations, are being addressed by this remedial action. The sludge in both the LRSP and Schmidt Lake contains heavy metals, organic compounds, and trace levels of radionuclides. The selected remedial action for the site includes excavation of 85,000 cubic yards of sludge with partial solidification of the sludge, followed by offsite disposal in a permitted solid waste landfill

  1. 75 FR 12462 - Fisheries of the Northeastern United States; Northeast Multispecies Fishery; Removal of Gear...

    Science.gov (United States)

    2010-03-16

    ...; Removal of Gear Restriction for the U.S./Canada Management Area AGENCY: National Marine Fisheries Service...; removal of gear restrictions. SUMMARY: This action removes temporary gear restrictions in both the Eastern... Management Act (Magnuson- Stevens Act). DATES: Removal of the temporary gear restriction in the Western U.S...

  2. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3. Appendixes E and F

    International Nuclear Information System (INIS)

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of j Strontium 90 ( 90 Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70 percent of the 90 Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10 -6 cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground

  3. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3. Appendixes E and F

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of j Strontium 90 ({sup 90}Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70 percent of the {sup 90}Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10{sup -6} cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground.

  4. Case study: Montclair/West Orange and Glen Ridge Radium Superfund sites

    International Nuclear Information System (INIS)

    Pezzella, R.; Seppi, P.; Watson, D.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Radium Sites are located 12 miles west of New York City in three residential communities in Essex County, New Jersey. The sites are contaminated with waste materials from a local radium processing facility which ceased operations in 1926. Houses were subsequently constructed on or near the radium waste disposal areas. The waste material was also used as backfill, which caused contamination to be spread randomly over the communities. There are 769 properties between four townships that comprise the Superfund sites. The Environmental Protection Agency (EPA) conducted an aerial survey in 1981 which identified the boundaries of the sites. In 1985, the New Jersey Department of Environmental Protection (NJDEP) began a pilot study to examine the feasibility of excavation and off-site disposal of contaminated material as a permanent solution. The study was interrupted when the permit for the disposal site was revoked by the state of Nevada. Since 1990 field testing has been completed on over 725 properties and remediation and restoration has been completed on 75 properties

  5. The AMES Laboratory chemical disposal site removal action: Source removal, processing, and disposal

    International Nuclear Information System (INIS)

    Shirley, R.S.

    1996-01-01

    The Ames Laboratory has historically supported the U.S. Department of Energy (USDOE) and its predecessor agencies by providing research into the purification and manufacturing of high purity uranium, thorium, and yttrium metals. Much of this work was accomplished in the late 1950s and early 1960s prior to the legislation of strict rules and regulations covering the disposal of radioactive and chemical wastes. As a result, approximately 800 cubic meters of low-level radioactive wastes, chemical wastes, and contaminated debris were disposed in nine near surface cells located in a 0.75 hectare plot of land owned by Iowa State University in Ames, Iowa. Under a national contract with the U.S. Army Corps of Engineers (USACE), OHM Remediation Services Corp (OHM) was tasked with providing turnkey environmental services to remove, process, package, transport, and coordinate the disposal of the waste materials and contaminated environmental media

  6. The Ames Laboratory Chemical Disposal Site removal action: Source removal, processing, and disposal

    International Nuclear Information System (INIS)

    Shirley, R.S.

    1995-01-01

    The Ames Laboratory has historically supported the US Department of Energy (USDOE) and its predecessor agencies by providing research into the purification and manufacturing of high purity uranium, thorium, and yttrium metals. Much of this work was accomplished in the late 1950s and early 1960s prior to the legislation of strict rules and regulations covering the disposal of radioactive and chemical wastes. As a result, approximately 800 cubic meters of low-level radioactive wastes, mixed wastes, and contaminated debris were disposed in nine near surface cells located in a 0.75 hectare plot of land owned by Iowa State University in Ames, Iowa. Under a national contract with the US Army Corps of Engineers (USACE), OHM Remediation Services Corp. (OHM) was tasked with providing turnkey environmental services to remove, process, package, transport, and coordinate the disposal of the waste materials and contaminated environmental media

  7. Corrective Action Decision Document/Closure Report for Corrective Action Unit 561: Waste Disposal Areas, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2011-08-01

    CAU 561 comprises 10 CASs: (1) 01-19-01, Waste Dump; (2) 02-08-02, Waste Dump and Burn Area; (3) 03-19-02, Debris Pile; (4) 05-62-01, Radioactive Gravel Pile; (5) 12-23-09, Radioactive Waste Dump; (6) 22-19-06, Buried Waste Disposal Site; (7) 23-21-04, Waste Disposal Trenches ; (8) 25-08-02, Waste Dump; (9) 25-23-21, Radioactive Waste Dump; and (10) 25-25-19, Hydrocarbon Stains and Trench. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 561 with no further corrective action. The purpose of the CAI was to fulfill the following data needs as defined during the DQO process: (1) Determine whether COCs are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to complete appropriate corrective actions. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) No contamination exceeding FALs was identified at CASs 01-19-01, 03-19-02, 05-62-01, 12-23-09, and 22-19-06. (2) The surface and subsurface soil within the burn area at CAS 02-08-02 contains arsenic and lead above the FALs of 23 milligrams per kilogram (mg/kg) and 800 mg/kg, respectively. The surface and subsurface soil within the burn area also contains melted lead slag (potential source material [PSM]). The soil within the waste piles contains polyaromatic hydrocarbons (PAHs) above the FALs. The contamination within the burn area is spread throughout the area, as it was not feasible to remove all the PSM (melted lead), while at the waste piles, the contamination is confined to the piles. (3) The surface and subsurface soils within Trenches 3 and 5 at CAS 23-21-04 contain arsenic and polychlorinated biphenyls (PCBs) above the FALs of 23 mg/kg and 0.74 mg/kg, respectively. The soil was removed from both trenches, and the soil that remains at this CAS does not contain contamination exceeding the FALs. Lead bricks and

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 561: Waste Disposal Areas, Nevada National Security Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Krauss, Mark

    2011-01-01

    CAU 561 comprises 10 CASs: (1) 01-19-01, Waste Dump; (2) 02-08-02, Waste Dump and Burn Area; (3) 03-19-02, Debris Pile; (4) 05-62-01, Radioactive Gravel Pile; (5) 12-23-09, Radioactive Waste Dump; (6) 22-19-06, Buried Waste Disposal Site; (7) 23-21-04, Waste Disposal Trenches ; (8) 25-08-02, Waste Dump; (9) 25-23-21, Radioactive Waste Dump; and (10) 25-25-19, Hydrocarbon Stains and Trench. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 561 with no further corrective action. The purpose of the CAI was to fulfill the following data needs as defined during the DQO process: (1) Determine whether COCs are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to complete appropriate corrective actions. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) No contamination exceeding FALs was identified at CASs 01-19-01, 03-19-02, 05-62-01, 12-23-09, and 22-19-06. (2) The surface and subsurface soil within the burn area at CAS 02-08-02 contains arsenic and lead above the FALs of 23 milligrams per kilogram (mg/kg) and 800 mg/kg, respectively. The surface and subsurface soil within the burn area also contains melted lead slag (potential source material (PSM)). The soil within the waste piles contains polyaromatic hydrocarbons (PAHs) above the FALs. The contamination within the burn area is spread throughout the area, as it was not feasible to remove all the PSM (melted lead), while at the waste piles, the contamination is confined to the piles. (3) The surface and subsurface soils within Trenches 3 and 5 at CAS 23-21-04 contain arsenic and polychlorinated biphenyls (PCBs) above the FALs of 23 mg/kg and 0.74 mg/kg, respectively. The soil was removed from both trenches, and the soil that remains at this CAS does not contain contamination exceeding the FALs. Lead bricks and

  9. Green Remediation Best Management Practices: Soil Vapor Extraction & Air Sparging

    Science.gov (United States)

    Historically, approximately one-quarter of Superfund source control projects have involved soil vapor extraction (SVE) to remove volatile organic compounds (VOCs) sorbed to soil in the unsaturated (vadose) zone.

  10. Radiation Emitting Product Corrective Actions and Recalls

    Data.gov (United States)

    U.S. Department of Health & Human Services — This database provides descriptions of radiation-emitting products that have been recalled under an approved corrective action plan to remove defective and...

  11. Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

    International Nuclear Information System (INIS)

    Walker, Stuart

    2008-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions

  12. Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.

    1991-11-01

    The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this time has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA's National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impact associated with the proposed action

  13. A Case of Action-Induced Clonus that Mimicked Action Tremors and was Associated with Cervical Schwannoma

    Directory of Open Access Journals (Sweden)

    Young-Hee Sung

    2010-10-01

    Full Text Available Clonus is the rhythmic muscle contraction which usually occurs in patients with lesions involving descending motor pathways. Sometimes, rhythmic oscillation of action induced clonus could be confused to action tremor. We report a case of action induced clonus associated with cervical schwannoma which was misdiagnosed as essential tremor. The patient had spasticity in all limbs with exaggerated tendon reflexes, and passive stretch-induced clonus. Imaging and histological examinations revealed a schwannoma extending from C2 to C7. The lesion was partially removed by surgery. Even though essential tremor is a common disease, clinician have to do sufficient neurologic examination considering differential diagnosis.

  14. Imitation of the sequential structure of actions by chimpanzees (Pan troglodytes).

    Science.gov (United States)

    Whiten, A

    1998-09-01

    Imitation was studied experimentally by allowing chimpanzees (Pan troglodytes) to observe alternative patterns of actions for opening a specially designed "artificial fruit." Like problematic foods primates deal with naturally, with the test fruit several defenses had to be removed to gain access to an edible core, but the sequential order and method of defense removal could be systematically varied. Each subject repeatedly observed 1 of 2 alternative techniques for removing each defense and 1 of 2 alternative sequential patterns of defense removal. Imitation of sequential organization emerged after repeated cycles of demonstration and attempts at opening the fruit. Imitation in chimpanzees may thus have some power to produce cultural convergence, counter to the supposition that individual learning processes corrupt copied actions. Imitation of sequential organization was accompanied by imitation of some aspects of the techniques that made up the sequence.

  15. Action-oriented characterization at Argonne National Laboratory

    International Nuclear Information System (INIS)

    Moos, L.P.; Swale, R.E.

    1995-01-01

    Argonne National Laboratory-East and the US Department of Energy have initiated a voluntary corrective action strategy to characterize and clean up some of the on-site solid waste management units that are subject to the Resource Conservation and Recovery Act Corrective Action process. This strategy is designed for the current atmosphere of reduced funding levels and, increased demands for cleanup actions. A focused characterization program is used to identify and roughly delineate the areas of greatest risk, relying as much as possible on existing data about the site; then, removal or interim remedial actions are implemented, where appropriate. Two interim cleanup operations were completed in 1994. Two additional interim actions are planned for 1995. Future actions may include decontamination operations, soil remediation, and construction of containment barriers

  16. Removal of radioactivity and mineral values from uranium mill tailings

    International Nuclear Information System (INIS)

    Williams, J.M.; Cokal, E.J.; Dreesen, D.R.

    1981-01-01

    One possible approach to remedial action on uranium mill tailings involves the removal of the components that are responsible for the environmental concern (notably radon releases) posed by these materials. Removing mineral values at the same time can defray much of the cost. This paper presents laboratory results on sulfuric acid leachings and their effectiveness in accomplishing these aims. 9 figures, 4 tables

  17. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    Energy Technology Data Exchange (ETDEWEB)

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  18. High-rate oil removing scouring agent. Koyubun jokyoyo seirenzai ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Ishihara, K.; Sato, Y. (Dai-Ichi Kogyo Seiyaku Co. Ltd., Kyoto (Japan))

    1991-11-01

    Fiber forming, scutching and knitting processes in recent years are performed three to five times faster than in the conventional processes. Associated therewith, oil solutions are taken importantly for their stability and workability, such as smoothing properties, heat resistance and abrasion resistance. On the other hand, difficulty is increasing in removing the oils after scutching and knitting. This paper explains basic rinsing activities required in oil removal, and describes various test characteristics and compatibility of various high-rate oil removing scouring agents. An oil-in-water rinsing mechanism relies upon comprehensive actions of a surfactant in wetting, permeation, emulsified dispersion and solubilization. The most importantly taken among them is the emulsifying action, which largely depends upon its chemical structure. Therefore, for a high-rate oil removing scouring agent, creation of activators is required that make the above basic characteristics and activities compatible for various applications. For example, the above product covers a great variety of kinds for diverse applications, based on non-ionic and anion-based activators. 6 figs., 20 tabs.

  19. Removal site evaluation report on the Tower Shielding Facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This removal site evaluation report for the Tower Shielding Facility (TSF) at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Tower Shielding Facility pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and if remedial site evaluations or removal actions are, therefore, required. The scope of the project included a review of historical evidence regarding operations and use of the facility; interviews with facility personnel concerning current and past operating practices; a site inspection; and identification of hazard areas requiring maintenance, removal, or remedial actions. Based an the findings of this removal site evaluation, adequate efforts are currently being made at the TSF to contain and control existing contamination and hazardous substances on site in order to protect human health and the environment No conditions requiring maintenance or removal actions to mitigate imminent or potential threats to human health and the environment were identified during this evaluation. Given the current conditions and status of the buildings associated with the TSF, this removal site evaluation is considered complete and terminated according to the requirements for removal site evaluation termination

  20. Raman spectroscopy of efflorescent sulfate salts from Iron Mountain Mine Superfund Site, California

    Science.gov (United States)

    Sobron, Pablo; Alpers, Charles N.

    2013-01-01

    The Iron Mountain Mine Superfund Site near Redding, California, is a massive sulfide ore deposit that was mined for iron, silver, gold, copper, zinc, and pyrite intermittently for nearly 100 years. As a result, both water and air reached the sulfide deposits deep within the mountain, producing acid mine drainage consisting of sulfuric acid and heavy metals from the ore. Particularly, the drainage water from the Richmond Mine at Iron Mountain is among the most acidic waters naturally found on Earth. The mineralogy at Iron Mountain can serve as a proxy for understanding sulfate formation on Mars. Selected sulfate efflorescent salts from Iron Mountain, formed from extremely acidic waters via drainage from sulfide mining, have been characterized by means of Raman spectroscopy. Gypsum, ferricopiapite, copiapite, melanterite, coquimbite, and voltaite are found within the samples. This work has implications for Mars mineralogical and geochemical investigations as well as for terrestrial environmental investigations related to acid mine drainage contamination.

  1. Raman spectroscopy of efflorescent sulfate salts from Iron Mountain Mine Superfund Site, California.

    Science.gov (United States)

    Sobron, Pablo; Alpers, Charles N

    2013-03-01

    The Iron Mountain Mine Superfund Site near Redding, California, is a massive sulfide ore deposit that was mined for iron, silver, gold, copper, zinc, and pyrite intermittently for nearly 100 years. As a result, both water and air reached the sulfide deposits deep within the mountain, producing acid mine drainage consisting of sulfuric acid and heavy metals from the ore. Particularly, the drainage water from the Richmond Mine at Iron Mountain is among the most acidic waters naturally found on Earth. The mineralogy at Iron Mountain can serve as a proxy for understanding sulfate formation on Mars. Selected sulfate efflorescent salts from Iron Mountain, formed from extremely acidic waters via drainage from sulfide mining, have been characterized by means of Raman spectroscopy. Gypsum, ferricopiapite, copiapite, melanterite, coquimbite, and voltaite are found within the samples. This work has implications for Mars mineralogical and geochemical investigations as well as for terrestrial environmental investigations related to acid mine drainage contamination.

  2. Value engineering study for seletion of verticle barrier technology at a Superfund site

    International Nuclear Information System (INIS)

    Bryan, E.E.; Guglielmetti, J.L.; Butler, P.B.; Brill, M.P.

    1997-01-01

    A value engineering (VE) study was conducted to identify and evaluate vertical barrier technologies and alignments for a Superfund project in New Castle County, Delaware. The objective was to select and recommend the most appropriate vertical barrier(s) for two separate landfills and a portion of the manufacturing plant on the site. A VE team was assembled to identify and evaluate site specific issues related to effectiveness, constructability and cost for numerous vertical barrier technologies. Several cost-effective alternatives were identified that met project objectives. The VE study concluded that a composite vertical barrier system consisting of a soil-bentonite slurry trench and steel sheet piles would provide effective containment of the North Landfill. Additionally, the geologic confining unit specified in the Record of Decision (ROD) was found to be unsuitable as a vertical barrier key and a more suitable, shallow confining unit was discovered. This paper describes the value engineering process and results of the VE study for one of the landfills

  3. Superfund explanation of significant difference for the record of decision (EPA Region 8): Lowry Landfill, Aurora, CO, October 24, 1997

    International Nuclear Information System (INIS)

    1999-03-01

    Please be advised that there is an error within Attachment E (Technical Evaluation of Proposed Ground-Water Treatment and Disposal Alternatives) of the ''Responsiveness Summary for the Second Explanation of Significant Differences, Lowry Landfill Superfund Site'' document. The evaluation table, which summarizes the rankings of the two cleanup alternatives, failed to include numerical values for State Acceptance and Community Acceptance. Enclosed is a copy of the table as it should have appeared in Attachment E. Copies of this errata sheet are being mailed to all recipients of the Responsiveness Summary

  4. Closure report for housekeeping category, Corrective Action Unit 349, Area 12, Nevada Test Site

    International Nuclear Information System (INIS)

    1998-01-01

    This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 349 Area 12 at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms

  5. Closure report for housekeeping category, Corrective Action Unit 349, Area 12, Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 349 Area 12 at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.

  6. Corrective Action Decision Document for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Revision 0 with ROTC 1

    International Nuclear Information System (INIS)

    Boehlecke, Robert

    2004-01-01

    depths in the area associated with the Mud Plant. (4) CAS 03-20-05 contains TPH-DRO, metals, and radiological contamination within the injection well casing soil and TPH-DRO contamination at the depth coincidental with the bottom of the injection well sump. Based on the evaluation of analytical data from the corrective action investigation, review of future and current operations in Areas 1 and 3 of the Nevada Test Site, and the detailed and comparative analysis of the potential corrective action alternatives, the following corrective actions are recommended for the Corrective Action Unit 322 CASs. Closure in Place with Administrative Controls is the preferred corrective action for the following CASs: (1) CAS 01-25-01, removal of TPH-DRO contamination would pose a significant safety hazard due to the site location. (2) CAS 03-25-03 No contamination remains at Area A (AST Berm); and thus, no further action is the preferred alternative at this part of the CAS. However at Area B, TPH-DRO contamination is varied in concentration and location and the footprint of the CAS is large, removal of contaminated ''pockets'' would be laborious and cost prohibitive. The plutonium-239 surface contamination identified at CAS 03-25-03 Area B has been removed and drummed as a best management practice. (3) CAS 03-20-05, TPH-DRO, metals, and radiological contamination are present in the injection well casing soils. Recommend corrective action includes removal of the liquid in the injection well sump (approximately 3 feet (ft) of liquid at 60 ft below ground surface), grouting the sump, and the area within the injection well casing. The plutonium-239 surface contamination identified at CAS 03-20-05 has been removed and drummed as a best management practice and will be disposed of as low-level radioactive waste. It is recommended that the liquids be removed from the holding tank wells and the sumps of the two outer holding tanks within the BOP Shop, and the sumps be grouted, and the holding

  7. Corrective Action Decision Document for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Revision 0 with ROTC 1

    Energy Technology Data Exchange (ETDEWEB)

    Boehlecke, Robert

    2004-12-01

    locations and depths in the area associated with the Mud Plant. (4) CAS 03-20-05 contains TPH-DRO, metals, and radiological contamination within the injection well casing soil and TPH-DRO contamination at the depth coincidental with the bottom of the injection well sump. Based on the evaluation of analytical data from the corrective action investigation, review of future and current operations in Areas 1 and 3 of the Nevada Test Site, and the detailed and comparative analysis of the potential corrective action alternatives, the following corrective actions are recommended for the Corrective Action Unit 322 CASs. Closure in Place with Administrative Controls is the preferred corrective action for the following CASs: (1) CAS 01-25-01, removal of TPH-DRO contamination would pose a significant safety hazard due to the site location. (2) CAS 03-25-03 No contamination remains at Area A (AST Berm); and thus, no further action is the preferred alternative at this part of the CAS. However at Area B, TPH-DRO contamination is varied in concentration and location and the footprint of the CAS is large, removal of contaminated ''pockets'' would be laborious and cost prohibitive. The plutonium-239 surface contamination identified at CAS 03-25-03 Area B has been removed and drummed as a best management practice. (3) CAS 03-20-05, TPH-DRO, metals, and radiological contamination are present in the injection well casing soils. Recommend corrective action includes removal of the liquid in the injection well sump (approximately 3 feet (ft) of liquid at 60 ft below ground surface), grouting the sump, and the area within the injection well casing. The plutonium-239 surface contamination identified at CAS 03-20-05 has been removed and drummed as a best management practice and will be disposed of as low-level radioactive waste. It is recommended that the liquids be removed from the holding tank wells and the sumps of the two outer holding tanks within the BOP Shop, and the sumps

  8. Influence of a chlor-alkali superfund site on mercury bioaccumulation in periphyton and low-trophic level fauna

    Science.gov (United States)

    Buckman, Kate L.; Marvin-DiPasquale, Mark C.; Taylor, Vivien F.; Chalmers, Ann T.; Broadley, Hannah J.; Agee, Jennifer L.; Jackson, Brian P.; Chen, Celia Y.

    2015-01-01

    In Berlin, New Hampshire, USA, the Androscoggin River flows adjacent to a former chlor-alkali facility that is a US Environmental Protection Agency Superfund site and source of mercury (Hg) to the river. The present study was conducted to determine the fate and bioaccumulation of methylmercury (MeHg) to lower trophic-level taxa in the river. Surface sediment directly adjacent to the source showed significantly elevated MeHg (10–40× increase, mean ± standard deviation [SD]: 20.1 ± 24.8 ng g–1 dry wt) and total mercury (THg; 10–30× increase, mean ± SD: 2045 ± 2669 ng g–1 dry wt) compared with all other reaches, with sediment THg and MeHg from downstream reaches elevated (3–7× on average) relative to the reference (THg mean ± SD: 33.5 ± 9.33 ng g–1 dry wt; MeHg mean ± SD: 0.52 ± 0.21 ng g–1 dry wt). Water column THg concentrations adjacent to the point source for both particulate (0.23 ng L–1) and dissolved (0.76 ng L–1) fractions were 5-fold higher than at the reference sites, and 2-fold to 5-fold higher than downstream. Methylmercury production potential of periphyton material was highest (2–9 ng g–1 d–1 dry wt) adjacent to the Superfund site; other reaches were close to or below reporting limits (0. 1 ng g–1 d–1 dry wt). Total Hg and MeHg bioaccumulation in fauna was variable across sites and taxa, with no clear spatial patterns downstream of the contamination source. Crayfish, mayflies, and shiners showed a weak positive relationship with porewater MeHg concentration.

  9. Efficient analysis using custom interactive visualization tools at a Superfund site

    International Nuclear Information System (INIS)

    Williams, G.; Durham, L.

    1992-01-01

    Custom visualization analysis programs were developed and used to analyze contaminant transport calculations from a three-dimensional numerical groundwater flow model developed for a Department of Energy Superfund site. The site hydrogeology, which is highly heterogenous, includes both fractured limestone and dolomite and alluvium deposits. Three-dimensional interactive visualization techniques were used to understand and analyze the three-dimensional, double-porosity modeling results. A graphical object oriented programming environment was applied to efficiently develop custom visualization programs in a coarse-grained data structure language. Comparisons were made, using the results from the three-dimensional, finite-difference model, between traditional two-dimensional analyses (contour and vector plots) and interactive three-dimensional techniques. Subjective comparison areas include the accuracy of analysis, the ability to understand the results of three-dimensional contaminant transport simulation, and the capability to transmit the results of the analysis to the project management. In addition, a quantitative comparison was made on the time required to develop a thorough analysis of the modeling results. The conclusions from the comparative study showed that the visualization analysis provided an increased awareness of the contaminant transport mechanisms, provided new insights into contaminant migration, and resulted in a significant time savings

  10. Efficient analysis using custom interactive visualization tools at a Superfund site

    Energy Technology Data Exchange (ETDEWEB)

    Williams, G. [Northwestern Univ., Evanston, IL (United States); Durham, L. [Argonne National Lab., IL (United States)

    1992-12-01

    Custom visualization analysis programs were developed and used to analyze contaminant transport calculations from a three-dimensional numerical groundwater flow model developed for a Department of Energy Superfund site. The site hydrogeology, which is highly heterogenous, includes both fractured limestone and dolomite and alluvium deposits. Three-dimensional interactive visualization techniques were used to understand and analyze the three-dimensional, double-porosity modeling results. A graphical object oriented programming environment was applied to efficiently develop custom visualization programs in a coarse-grained data structure language. Comparisons were made, using the results from the three-dimensional, finite-difference model, between traditional two-dimensional analyses (contour and vector plots) and interactive three-dimensional techniques. Subjective comparison areas include the accuracy of analysis, the ability to understand the results of three-dimensional contaminant transport simulation, and the capability to transmit the results of the analysis to the project management. In addition, a quantitative comparison was made on the time required to develop a thorough analysis of the modeling results. The conclusions from the comparative study showed that the visualization analysis provided an increased awareness of the contaminant transport mechanisms, provided new insights into contaminant migration, and resulted in a significant time savings.

  11. Hazardous waste management: Reducing the risk

    International Nuclear Information System (INIS)

    Goldman, B.A.; Hulme, J.A.; Johnson, C.

    1986-01-01

    Congress has strengthened the laws under which active hazardous waste facilities are regulated. Nevertheless, after visiting a number of active treatment, storage, and disposal facilities, the Council on Economic Priorities (CEP) found that not only do generators not know which facilities are the best, but that the EPA has not always selected the best facilities to receive wastes removed from Superfund sites. Other facilities were better managed, better located, and better at using more advanced technologies than the facilities the EPA selected. In fact, of the ten facilities CEP evaluated in detail the EPA chose the one that performed worst - CECOS International, Inc. in Williamsburg, Ohio - to receive Superfund wastes in more instances than any of the other nine facilities. Data from a house subcommittee survey indicate that almost half of the operating hazardous waste facilities the EPA chose to receive wastes removed from Superfund sites may have contaminated groundwater. Some of the chosen facilities may even be partially responsible for a share of the wastes they are being paid to clean up. Hazardous waste management strategies and technology, how to evaluate facilities, and case studies of various corporations and hazardous waste management facilities are discussed

  12. Measurement and monitoring technologies are important SITE program component

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    An ongoing component of the Superfund Innovative Technologies Evaluation (SITE) Program, managed by the US EPA at its Hazardous Waste Engineering Research Laboratory in Cincinnati, is the development and demonstration of new and innovative measurement and monitoring technologies that will be applicable to Superfund site characterization. There are four important roles for monitoring and measurement technologies at Superfund sites: (1) to assess the extent of contamination at a site, (2) to supply data and information to determine impacts to human health and the environment, (3) to supply data to select the appropriate remedial action, and (4) to monitor the success or effectiveness of the selected remedy. The Environmental Monitoring Systems Laboratory in Las Vegas, Nevada (EMSL-LV) has been supporting the development of improved measurement and monitoring techniques in conjunction with the SITE Program with a focus on two areas: Immunoassay for toxic substances and fiber optic sensing for in-situ analysis at Superfund sites

  13. Removal of uranium and salt from the Molten Salt Reactor Experiment

    International Nuclear Information System (INIS)

    Peretz, F.J.; Rushton, J.E.; Faulkner, R.L.; Walker, K.L.; Del Cul, G.D.

    1998-01-01

    In 1994, migration of 233 U was discovered to have occurred at the Molten Salt Reactor Experiment (MSRE) at Oak Ridge National Laboratory (ORNL). This paper describes the actions now underway to remove uranium from the off-gas piping and the charcoal bed, to remove and stabilize the salts, and to convert the uranium to a stable oxide for long-term storage

  14. Removal of uranium and salt from the Molten Salt Reactor Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Peretz, F.J.; Rushton, J.E.; Faulkner, R.L.; Walker, K.L.; Del Cul, G.D.

    1998-06-01

    In 1994, migration of {sup 233}U was discovered to have occurred at the Molten Salt Reactor Experiment (MSRE) at Oak Ridge National Laboratory (ORNL). This paper describes the actions now underway to remove uranium from the off-gas piping and the charcoal bed, to remove and stabilize the salts, and to convert the uranium to a stable oxide for long-term storage.

  15. Corrective Action Decision Document/Closure Report for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada National Security Site, Nevada with ROTC 1 and 2, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2011-07-01

    Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The other CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and

  16. OLEM Center for Program Analysis Site Analysis Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes environmental justice-related analyses of population located within a mile of Superfund and RCRA Corrective Action sites. It characterizes...

  17. Corrective Action Decision Document for Corrective Action Unit 322: Areas 1 and 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Rev. No. 0

    Energy Technology Data Exchange (ETDEWEB)

    Robert Boehlecke

    2004-12-01

    locations and depths in the area associated with the Mud Plant. (4) CAS 03-20-05 contains TPH-DRO, metals, and radiological contamination within the injection well casing soil and TPH-DRO contamination at the depth coincidental with the bottom of the injection well sump. Based on the evaluation of analytical data from the corrective action investigation, review of future and current operations in Areas 1 and 3 of the Nevada Test Site, and the detailed and comparative analysis of the potential corrective action alternatives, the following corrective actions are recommended for the Corrective Action Unit 322 CASs. Closure in Place with Administrative Controls is the preferred corrective action for the following CASs: (1) CAS 01-25-01, removal of TPH-DRO contamination would pose a significant safety hazard due to the site location. (2) CAS 03-25-03 No contamination remains at Area A (AST Berm); and thus, no further action is the preferred alternative at this part of the CAS. However at Area B, TPH-DRO contamination is varied in concentration and location and the footprint of the CAS is large, removal of contaminated ''pockets'' would be laborious and cost prohibitive. The plutonium-239 surface contamination identified at CAS 03-25-03 Area B has been removed and drummed as a best management practice. (3) CAS 03-20-05, TPH-DRO, metals, and radiological contamination are present in the injection well casing soils. Recommend corrective action includes removal of the liquid in the injection well sump (approximately 3 feet (ft) of liquid at 60 ft below ground surface), grouting the sump, and the area within the injection well casing.

  18. Mitigation action plan for 300-FF-1 remedial action

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-10-01

    A record of decision was issued (dated July 1996), for remediation of waste sites in the 300-FF-1 Operable Unit in the 300 Area of the Hanford Site. The selected remedies for the 300-FF-1 and 300-FF-5 waste sites include selective excavation and disposal of contaminated soil and debris from the process waste units, excavation and removal of the 618-4 Burial Ground, and institutional controls for groundwater. This mitigation action plan explains how cultural resources will be managed and how revegetation for these remedial activities will be planned

  19. Concentration and trend of 1,4-dioxane in wells sampled during 2002–2017 in the vicinity of the Tucson International Airport Area Superfund Site, Arizona

    Science.gov (United States)

    Tillman, Fred D.

    2017-09-25

    Industrial activities causing extensive groundwater contamination led to the listing of the Tucson International Airport Area (TIAA) as a Superfund Site in 1983. Early groundwater investigations identified volatile organic compounds (VOCs), including the chlorinated solvents trichloroethylene (TCE) and perchloroethylene (PCE), in wells in the area. Several responsible parties were identified and cleanup activities began in the late 1980s. In 2002, the compound 1,4-dioxane was discovered in wells in the area and has since been detected in measurable concentrations throughout the site. The U.S. Environmental Protection Agency (USEPA) classifies 1,4-dioxane as a likely human carcinogen.The purpose of this map is to present 1,4-dioxane concentrations in wells sampled from 2002 through mid-2017 in the TIAA Superfund Site area to indicate both the current status and trends in 1,4-dioxane groundwater contamination. This map includes data from wells in the commercial and residential community in the TIAA and does not include data from wells in suspected or confirmed source areas, such as Air Force Plant 44 and Tucson International Airport, or from wells within treatment facilities.

  20. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Appendixes A--D

    International Nuclear Information System (INIS)

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion data. The technical objective of the removal action was to reduce the off-site transport of Strontium 90 ( 90 Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70% of the 90 Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 X 10 -6 cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground. The main report describes brief background to the project, describes and analyzes the grouting operations, draws conclusions from the work performed, and presents some of the lessons learned. Appendices contain: (A) pipe driving records; (B) casing grout injection records; (C) in-situ hydraulic conductivity testing records; and (D) grout quality control testing records

  1. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  2. 78 FR 68995 - Safety Zone: Vessel Removal From the Oakland Estuary, Alameda, CA

    Science.gov (United States)

    2013-11-18

    ...-AA00 Safety Zone: Vessel Removal From the Oakland Estuary, Alameda, CA AGENCY: Coast Guard, DHS. ACTION... waters of the Oakland Estuary just north of the Park Street Bridge in Alameda, CA in support of the Oakland Estuary Closure for the Vessel Removal Project on November 4, 2013 through November 22, 2013. This...

  3. The role of risk assessment in remedial action cleanup programs (RACP): A case history

    International Nuclear Information System (INIS)

    Fessler, R.G.; Bergmann, W.R.; Greenberg, A.J.

    1988-01-01

    A RACP (Remedial Action Cleanup Program) selects site cleanup criteria that protect human health and the environment and are cost effective. They generally use existing environmental standards and/or guidelines which include safe drinking water, RCRA groundwater protection, threshold limit values and air quality standards, and recommended soil cleanup level guidelines. If these are the only criteria used, the RACP may be more stringent and expensive than necessary. Another step, a risk assessment program, should then be considered in the cleanup decision process. A risk assessment uses chemical concentrations observed in soils, groundwater, and air to project their impact on human health and the environment. Toxicological data on human exposure to these concentrations (LD 50s and carcinogenic action levels) are used to assess risks to human health and the environment. The risk assessment also considers the probability of exposure. E.g., remedial programs at Superfund sites consider three criteria in order to assess risks to human health and the environment: (1) pathways of exposure, (2) population at risk, and (3) chemicals of concern. By eliminating or severely limiting the significance of any criteria, the site may no longer represent a significant risk. This paper presents a RACP case history where a risk assessment was needed to select a cost effective and environmentally acceptable cleanup program

  4. Action Memorandum for Decommissioning the Engineering Test Reactor Complex under the Idaho Cleanup Project

    International Nuclear Information System (INIS)

    A. B. Culp

    2007-01-01

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared and released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessel. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface

  5. Engineering evaluation/cost analysis for the proposed removal of contaminated materials at the Elza Gate site, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-06-01

    This engineering evaluation/cost analysis (EE/CA) has been prepared in support of the proposed removal action for cleanup of radioactive and chemically contaminated soil at the Elza Gate site in Oak Ridge, Tennessee. This property became contaminated as a result of storage of ore residues, equipment, and other materials for the US Atomic Energy Commission. The US Department of Energy is responsible for cleanup of portions of the site under its Formerly Utilized Sites Remedial Action Program. In December 1990 an area known as Pad 1 was abrasively scoured to remove surface contamination, and in March 1991 removal of Pad 1 contamination was begun under a separate EE/CA. This EE/CA is intended to cover the remaining portions of the site for which the Department of Energy has responsibility. It has been determined that an EE/CA report is appropriate documentation for the proposed removal action. This EE/CA covers removal of contaminated soils and contaminated concrete rubble from the Elza Gate site. The primary objectives of this EE/CA report are to identify and describe the preferred removal action, and to document the selection of response activities that will mitigate the potential for release of contaminants from the property into the environment and that will minimize the associated threats to human health or welfare and the environment. The preferred alternative is disposition on the Oak Ridge Reservation. 30 refs., 7 figs., 12 tabs

  6. In-situ stabilization of the Geiger (C and M Oil) Superfund Site

    International Nuclear Information System (INIS)

    Andromalos, K.B.; Ameel, M.E.

    1994-01-01

    The Geiger (C and M Oil) Superfund Site is the first US Army Corps of Engineers managed soil remediation project which utilized the in-situ stabilization/solidification technique to remediate the soil. This project involved the remediation of approximately 23,000 cubic yards of contaminated soil. Contaminants of concern included chromium, lead, PCB'S, toluene, benzene, and other organic compounds. Clean-up criteria for the stabilized material was equal to the National Primary Drinking Water Regulations, when tested using the TCLP leachate extraction method. Chromium, lead, and toluene were the main contaminants of concern, with TCLP clean-up goals of 150, 15 and 1,000 parts per billion (ppb), respectively. This National Priorities List (NPL) site is located near Charleston, SC and was an abandoned old waste oil facility that utilized unlined shallow trenches for the storage of waste oil. This paper summarizes the initial testing programs and the final production work at the site. Extensive testing was performed throughout all phases of the project. This testing was performed for the purpose of mix optimization, quality assurance, and verification testing. Specific parameters tested included: TCLP testing of organics, metals and PCBs, permeability testing, and unconfirmed compression strength

  7. Closure Report for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-08-01

    Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according to the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and

  8. Closure Report for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according to the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd 3 of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft 3 of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and disposed as LLW, and

  9. A PRA case study of extended long term decay heat removal for shutdown risk assessment

    International Nuclear Information System (INIS)

    Roglans, J.; Ragland, W.A.; Hill, D.J.

    1992-01-01

    A Probabilistic Risk Assessment (PRA) of the Experimental Breeder Reactor II (EBR-II), a Department of Energy (DOE) Category A research reactor, has recently been completed at Argonne National Laboratory (ANL). The results of this PRA have shown that the decay heat removal system for EBR-II is extremely robust and reliable. In addition, the methodology used demonstrates how the actions of other systems not normally used for actions of other systems not normally used for decay heat removal can be used to expand the mission time of the decay heat removal system and further increase its reliability. The methodology may also be extended to account for the impact of non-safety systems in enhancing the reliability of other dedicated safety systems

  10. The spillover effects of affirmative action on competitiveness and unethical behavior

    DEFF Research Database (Denmark)

    Gupta, Nabanita Datta; Banerjee, Ritwik; Villeval, Marie Claire

    2018-01-01

    We conduct an artefactual field experiment to examine various spillover effects of Affirmative Action policies in the context of castes in India. We test a) if individuals who enter tournaments in the presence of an Affirmative Action policy remain competitive after the policy has been removed...... find no spillover effect on confidence and competitiveness once Affirmative Action is withdrawn. Furthermore, the discrimination by the dominant category against the backward category is not significantly aggravated by Affirmative Action, except when individuals learn that they have lost the previous...

  11. A strategy for end point criteria for Superfund remediation

    International Nuclear Information System (INIS)

    Hwang, S.T.

    1992-06-01

    Since the inception of cleanup for hazardous waste sites, estimating target cleanup levels has been the subject of considerable investigation and debate in the Superfund remediation process. Establishing formal procedures for assessing human health risks associated with hazardous waste sites has provided a conceptual framework for determining remediation goals and target cleanup levels (TCLs) based on human health and ecological risk consideration. This approach was once considered at variance with the concept of the pre-risk assessment period; that is, cleaning up to the background level, or using containment design or best available control technologies. The concept has been gradually adopted by the regulatory agencies and the parties responsible for cleanup. Evaluation of cleanup strategies at the outset of the planning stage will eventually benefit the parties responsible for cleanup and the oversight organizations, including regulatory agencies. Development of the strategies will provide an opportunity to promote an improvement in the pace and quality of many activities to be carried out. The strategies should help address the issues related to (1) improving remediation management activities to arrive at remediation as expeditiously as possible, (2) developing alternate remediation management activities, (3) identifying obstructing issues to management for resolution, (4) adapting the existing framework to correspond to the change in remediation statutes and guidelines, and (5) providing the basis for evaluating options for the record of decision process. This paper will discuss some of the issues and the research efforts that were addressed as part of the strategies requiring future discussion and comment

  12. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  13. Removal site evaluation report for the Isotope Facilities at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This removal site evaluation (RmSE) report of the Isotope Facilities at Oak Ridge National Laboratory (ORNL) was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Isotopes Facility pose a substantial risk to human health or the environment and if remedial site evaluations (RSEs) or removal actions are required. The scope of the project included: (1) a review of historical evidence regarding operations and use of the facility; (2) interviews with facility personnel concerning current and past operating practices; (3) a site inspection; and (4) identification of hazard areas requiring maintenance, removal, or remedial actions. The results of RmSE indicate that no substantial risks exist from contaminants present in the Isotope Facilities because adequate controls and practices exist to protect human health and the environment. The recommended correction from the RmSE are being conducted as maintenance actions; accordingly, this RmSE is considered complete and terminated.

  14. Removal site evaluation report for the Isotope Facilities at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    This removal site evaluation (RmSE) report of the Isotope Facilities at Oak Ridge National Laboratory (ORNL) was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Isotopes Facility pose a substantial risk to human health or the environment and if remedial site evaluations (RSEs) or removal actions are required. The scope of the project included: (1) a review of historical evidence regarding operations and use of the facility; (2) interviews with facility personnel concerning current and past operating practices; (3) a site inspection; and (4) identification of hazard areas requiring maintenance, removal, or remedial actions. The results of RmSE indicate that no substantial risks exist from contaminants present in the Isotope Facilities because adequate controls and practices exist to protect human health and the environment. The recommended correction from the RmSE are being conducted as maintenance actions; accordingly, this RmSE is considered complete and terminated

  15. Superfund Record of Decision (EPA Region 2): Ramapo Landfill Site, Rockland County, NY. (First remedial action), March 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 60-acre former landfill site is located on a 96-acre tract in the Town of Ramapo, Rockland County, New York, about 35 miles northwest of New York City. Utility corridors lie on three sides of the site, including high-voltage power transmission lines. The site is currently being used as a compaction and transfer facility by the Town of Ramapo. Trash and debris are weighed at a weigh station/guardhouse, compacted at a baler facility in the northeastern corner of the site, and transferred to the Al Turi Landfill in Goshen, New York. The ROD represents the entire remedial action for the site by controlling source of contamination and the generation of leachate, and treatment of contaminated ground water. The primary contaminants of concern affecting soil, ground water, and surface water are VOCs, including benzene; other organics; and metals, including arsenic, chromium, and lead. The selected remedial action for the site is included

  16. Investigation of off-site airborne transport of lead from a superfund removal action site using lead isotope ratios and concentrations

    Science.gov (United States)

    Pribil, Michael J.; Maddaloni, Mark A.; Staiger, Kimberly; Wilson, Eric; Magriples, Nick; Ali, Mustafa; Santella, Dennis

    2014-01-01

    Lead (Pb) concentration and Pb isotopic composition of surface and subsurface soil samples were used to investigate the potential for off-site air transport of Pb from a former white Pb processing facility to neighboring residential homes in a six block area on Staten Island, NY. Surface and subsurface soil samples collected on the Jewett White Pb site were found to range from 1.122 to 1.138 for 206Pb/207Pb and 2.393 to 2.411 for 208Pb/207Pb. The off-site surface soil samples collected from residential backyards, train trestle, near site grass patches and background areas varied from 1.144 to 1.196 for 206Pb/207Pb and 2.427 to 2.464 for 208Pb/207Pb. Two soil samples collected along Richmond Terrace, where Jewett site soils accumulated after major rain events, varied from 1.136 to 1.147 for 206Pb/207Pb and 2.407 to 2.419 for 208Pb/207Pb. Lead concentration for on-site surface soil samples ranged from 450 to 8000 ug/g, on-site subsurface soil samples ranged from 90,000 to 240,000 ug/g and off-site samples varied from 380 to 3500 ug/g. Lead concentration and isotopic composition for the Staten Island off-site samples were similar to previously published data for other northeastern US cities and reflect re-suspension and re-mobilization of local accumulated Pb. The considerable differences in both the Pb isotopic composition and Pb concentration of on-site and off-site samples resulted in the ability to geochemically trace the transport of particulate Pb. Data in this study indicate minimal off-site surface transport of Pb from the Jewett site into the neighboring residential area.

  17. 78 FR 27258 - Notice of Lodging of Proposed First Amended Consent Decree Under the Comprehensive Environmental...

    Science.gov (United States)

    2013-05-09

    ... the goal of reducing groundwater contaminant levels below drinking water standards and did not address...., Civil Action No. CV-93- 2990-JSL (SHx), with respect to the Pacific Coast Pipeline Superfund Site in...

  18. 76 FR 60357 - Golden Nematode; Removal of Regulated Areas

    Science.gov (United States)

    2011-09-29

    .... APHIS-2011-0036] Golden Nematode; Removal of Regulated Areas AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Interim rule and request for comments. SUMMARY: We are amending the golden nematode... infested areas. Surveys have shown that the fields in these two townships are free of golden nematode, and...

  19. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    Science.gov (United States)

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  20. Early actions in decontamination after nuclear power accidents, guidelines for planning

    International Nuclear Information System (INIS)

    Ulvsand, T.; Andersson, K.G.; Hansen, J.H.; Preuthun, J.; Sinkko, K.; Svennerstedt, G.; Uhnger, S.

    1997-01-01

    The target group for this document consists mainly of persons in charge of making plans for the actions in case of a radioactive release, persons found at different levels in the preparedness organisations. This report builds on a joint Nordic project, from which a basic report has been published (NKS-EKO--5(96)-18, INIS 28-021176), which is useful to experts. The work has extracted seven actions which can be classed as early: Hosing of roofs, walls, and paved areas; Lawn mowing; Pruning of trees and bushes; Removal of snow; and Vacuum cleaning of streets. For a reference deposition of 1 Mbq/m 2 of 137 Cs, calculations have been performed in five urban or suburban areas such as detached wooden or brick houses, semi-detached houses, terrace houses and city centre multi-storey houses. In case of dry or wet deposition, the report describes the expected effects of the various actions and the practical, economical and protective-relevant consequences generated by them. The actions giving the largest effects, measured as reduction in life time dose reduction, are lawn mowing, removal of snow and pruning of trees and bushes. The document finally discuss clean-up actions and their effects on the rural living environments. The actions will be the same as those taken in the urban areas, but there is a difference in the performance. In urban areas, the actions will to a great extent be performed by the society. In rural areas, the equipment and experience needed exist on the farms, and the inhabitants will perform the clean-up actions themselves

  1. Internal deposition of radiostrontium and its removal

    International Nuclear Information System (INIS)

    George, G.A.; Mehdi, E.I.; Toma, N.A.

    1979-01-01

    The purpose of the investigation was to study the metabolism of 90 Sr relative to that of calcium and the possible procedures that might enhance its decorporation. One per cent only of an injected dose of the tracer was detected per 100 ml of blood 24 hours after the introduction of this isotope into the rabbit. This dropped to 0.01% 15 days later. Soft tissues contained 10% and 1% of the injected dose one day and 15 days after injection respectively, whereas the bone content reached 23.3% 15 days after tracer injection. In vitro removal experiments showed that a mixture of calcium and calciferol was the most potent agent, causing the removal of 81% of that found in the control animals. In vivo investigations supported the in vitro findings in the use of a calcium-vitamin D mixture, which removed 75% and 45% of the tracer from bones one and four days after isotope injection. These studies also pointed out the importance of time in treatment, and that it could have dramatic effects on the process of removal. The effects of different decorporating agents and their modes of action are also discussed in the paper. (author)

  2. Object-action dissociation: A voxel-based lesion-symptom mapping study on 102 patients after glioma removal

    Directory of Open Access Journals (Sweden)

    Alberto Pisoni

    Full Text Available Data concerning the neural basis of noun and verb processing are inconsistent. Some authors assume that action-verb processing is based on frontal areas while nouns processing relies on temporal regions; others argue that the circuits processing verbs and nouns are closely interconnected in a predominantly left-lateralized fronto-temporal-parietal network; yet, other researchers consider that the primary motor cortex plays a crucial role in processing action verbs. In the present study, one hundred and two patients with a tumour either in the right or left hemisphere were submitted to picture naming of objects and actions before and after surgery. To test the effect of specific brain regions in object and action naming, patients' lesions were mapped and voxel-lesion-symptom mapping (VLSM was computed. Behavioural results showed that left-brain damaged patients were significantly more impaired than right brain-damaged patients. The VLSM showed that these two grammatical classes are segregated in the left hemisphere. In particular, scores in naming of objects correlated with damage to the anterior temporal region, while scores in naming of actions correlated with lesions in the parietal areas and in the posterior temporal cortex. In addition, VLSM analyses carried out on non-linguistic tasks were not significant, confirming that the regions associated with deficits in object and action naming were not generally engaged in all cognitive tasks. Finally, the involvement of subcortical pathways was investigated and the inferior longitudinal fasciculus proved to play a role in object naming, while no specific bundle was identified for actions. Keywords: Object action dissociation, Temporal lesion, Frontal lesion, Voxel-based lesion symptom mapping

  3. 77 FR 19079 - Removal of Regulations on Black Lung Benefits

    Science.gov (United States)

    2012-03-30

    ... visit our Internet site, Social Security Online, at http://www.socialsecurity.gov . SUPPLEMENTARY... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 410 [Docket No. SSA-2012-0012] RIN 0960-AH48 Removal of Regulations on Black Lung Benefits AGENCY: Social Security Administration. ACTION: Final rule. SUMMARY: This...

  4. Mercury in tree swallow food, eggs, bodies, and feathers at Acadia National Park, Maine, and an EPA superfund site, Ayer, Massachusetts.

    Science.gov (United States)

    Longcore, Jerry R; Haines, Terry A; Halteman, William A

    2007-03-01

    We monitored nest boxes during 1997-1999 at Acadia National Park, Mt. Desert Island, ME and at an old-field site in Orono, ME to determine mercury (Hg) uptake in tree swallow (Tachycineta bicolor) eggs, tissues, and food boluses. Also, in 1998-1999 we monitored nest boxes at Grove Pond and Plow Shop Pond at a U.S. Environmental Protection Agency Superfund site in Ayer, MA. We recorded breeding success at all locations. On average among locations, total mercury (THg) biomagnified 2 to 4-fold from food to eggs and 9 to 18-fold from food to feathers. These are minimum values because the proportion of transferable methyl mercury (MeHg) of the THg in insects varies (i.e., 35%-95% of THg) in food boluses. THg was highest in food boluses at Aunt Betty Pond at Acadia, whereas THg in eggs was highest at the Superfund site. A few eggs from nests at each of these locations exceeded the threshold (i.e., 800-1,000 ng/g, wet wt.) of embryotoxicity established for Hg. Hatching success was 88.9% to 100% among locations, but five eggs failed to hatch from 4 of the 11 clutches in which an egg exceeded this threshold. MeHg in feathers was highest in tree swallows at Aunt Betty Pond and the concentration of THg in bodies was related to the concentration in feathers. Transfer of an average of 80%-92% of the Hg in bodies to feathers may have enhanced nestling survival. Residues of Hg in tissues of tree swallows in the Northeast seem higher than those of the Midwest.

  5. Selective flotation for the removal of radionuclides from contaminated soil

    International Nuclear Information System (INIS)

    Miller, J.D.; Yu, Q.; Lu, Y.Q.

    1995-01-01

    Low-level radioactive contaminated soils (10--500 pci/gm) created by defense-related activities at certain Superfund sites, such as Nevada Test Site (NTS), is a current environmental concern. Many of these contaminated sites may require appropriate cleanup and restoration, which could cost billions of dollars and put tremendous pressure on limited financial resources. Therefore, the development of a selective flotation process to separate such radionuclides from contaminated soils should be considered. In this study, both a pure depleted UO 2 sample and three synthetic UO 2 /soil mixtures were used to evaluate surface chemistry features and to examine the possibility for the flotation of fine UO 2 particles from selected soils. It was intended that this model system would be a reasonable representation of contaminated soils such as those found the Nevada Test Site which are reported to be contaminated by PuO 2 fallout. The effect of reagent schedule, particle size distribution, and surface charge are discussed with respect to the flotation separation of the UO 2 /soil mixtures. It was found that both commercial fatty acids and reagent grade sodium oleate are effective collectors for UO 2 flotation provided the pH is adjusted to the range of pH 8--9. The bench-scale flotation results successfully demonstrated that froth flotation technology can be used to remove UO 2 from such model contaminated soils with appropriate flotation chemistry conditions which depend on the soil characteristics and other pretreatment procedures

  6. Shocking Path of Least Resistance Shines Light on Subsurface by Revealing the Paths of Water and the Presence of Faults: Stacked EM Case Studies over Barite Hills Superfund Site in South Carolina

    Science.gov (United States)

    Haggar, K. S.; Nelson, H. R., Jr.; Berent, L. J.

    2017-12-01

    The Barite Hills/Nevada Gold Fields mines are in Late Proterozoic and early Paleozoic rocks of the gold and iron sulfides rich Carolina slate belt. The mines were active from 1989 to1995. EPA and USGS site investigations in 2003 resulted in the declaration of the waste pit areas as a superfund site. The USGS and private consulting firms have evaluated subsurface water flow paths, faults & other groundwater-related features at this superfund site utilizing 2-D conductivity & 3-D electromagnetic (EM) surveys. The USGS employed conductivity to generate instantaneous 2-D profiles to evaluate shallow groundwater patterns. Porous regolith sediments, contaminated water & mine debris have high conductivity whereas bedrock is identified by its characteristic low conductivity readings. Consulting contractors integrated EM technology, magnetic & shallow well data to generate 3-D images of groundwater flow paths at given depths across the superfund site. In so doing several previously undetected faults were identified. Lighting strike data was integrated with the previously evaluated electrical and EM data to determine whether this form of natural-sourced EM data could complement and supplement the more traditional geophysical data described above. Several lightning attributes derived from 3-D lightning volumes were found to correlate to various features identified in the previous geophysical studies. Specifically, the attributes Apparent Resistivity, Apparent Permittivity, Peak Current & Tidal Gravity provided the deepest structural geological framework & provided insights into rock properties & earth tides. Most significantly, Peak Current showed remarkable coincidence with the preferred groundwater flow map identified by one of the contractors utilizing EM technology. This study demonstrates the utility of robust integrated EM technology applications for projects focused on hydrology, geohazards to dams, levees, and structures, as well as mineral and hydrocarbon exploration.

  7. The challenge of carbon dioxide removal for EU policy-making

    Science.gov (United States)

    Scott, Vivian; Geden, Oliver

    2018-05-01

    Most scenarios to meet the Paris Agreement require negative emissions technologies. The EU has assumed a global leadership role in mitigation action and low-carbon energy technology development and deployment, but carbon dioxide removal presents a serious challenge to its low-carbon policy paradigm and experience.

  8. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Nevada Site Office, Las Vegas, NV (United States)

    2016-02-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.

  9. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick

    2016-01-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material - including lead plates, lead bricks, and lead-shielded cables was removed during the investigation and requires no additional corrective action.

  10. Experience with after-shutdown decay heat removal - BWRs and PWRs

    International Nuclear Information System (INIS)

    Haugh, J.J.; Mollerus, F.J.; Booth, H.R.

    1992-01-01

    Boiling-water reactors (BWRs) and pressurized-water reactors (PWRs) make use of residual heat removal systems (RHRSs) during reactor shutdown. RHRS operational events involving an actual loss or significant degradation of an RHRS during shutdown heat removal are often prompted or aggravated by complex, changing plant conditions and by concurrent maintenance operations. Events involving loss of coolant inventory, loss of decay heat removal capability, or inadvertent pressurization while in cold shutdown have occurred. Because fewer automatic protective fetures are operative during cold shutdowns, both prevention and termination of events depend heavily on operator action. The preservation of RHRS cooling should be an important priority in all shutdown operations, particularly where there is substantial decay heat and a reduced water inventory. 13 refs., 3 figs., 4 tabs

  11. Full scale solvent extraction remedial results

    International Nuclear Information System (INIS)

    Cash, A.B.

    1992-01-01

    Sevenson Extraction Technology, Inc. has completed the development of the Soil Restoration Unit (initially developed by Terra-Kleen Corporation), a mobile, totally enclosed solvent extraction treatment facility for the removal of organic contaminated media is greater by a closed loop, counter current process that recycles all solvents. The solvents used are selected for the individual site dependant upon the contaminants, such as PCB's, oil, etc. and the soil conditions. A mixture of up to fourteen non-toxic solvents can be used for complicated sites. The full scale unit has been used to treat one superfund site, the Traband Site in Tulsa, Oklahoma, and is currently treating another superfund site, the Pinette's Salvage Yard Site in Washburn, Maine. The full scale Soil Restoration Unit has also been used at a non-superfund site, as part of a TSCA Research and Development permit. The results from these sites will be discussed in brief herein, and in more detail in the full paper

  12. Simultaneous electrodialytic removal of PAH, PCB, TBT and heavy metals from sediments

    DEFF Research Database (Denmark)

    Pedersen, Kristine B.; Lejon, Tore; Jensen, Pernille Erland

    2017-01-01

    with the need of different remedial actions for each pollutant. In this study, electrodialytic remediation (EDR) of sediments was found effective for simultaneous removal of heavy metals and organic pollutants for sediments from Arctic regions - Sisimiut in Greenland and Hammerfest in Norway. The influence...... was found to be important for the removal of heavy metals and TBT, while photolysis was significant for removal of PAH, PCB and TBT. In addition, dechlorination was found to be important for the removal of PCB. The highest removal efficiencies were found for heavy metals, TBT and PCB (>40%) and lower......Contaminated sediments are remediated in order to protect human health and the environment, with the additional benefit of using the treated sediments for other activities. Common for many polluted sediments is the contamination with several different pollutants, making remediation challenging...

  13. Stakeholder value-linked sustainability assessment: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Apitz, Sabine E; Fitzpatrick, Anne G; McNally, Amanda; Harrison, David; Coughlin, Conor; Edwards, Deborah A

    2018-01-01

    Regulatory decisions on remediation should consider affected communities' needs and values, and how these might be impacted by remedial options; this process requires that diverse stakeholders are able to engage in a transparent consideration of value trade-offs and of the distribution of risks and benefits associated with remedial actions and outcomes. The Stakeholder Values Assessment (SVA) tool was developed to evaluate remedial impacts on environmental quality, economic viability, and social equity in the context of stakeholder values and priorities. Stakeholder values were linked to the pillars of sustainability and also to a range of metrics to evaluate how sediment remediation affects these values. Sediment remedial alternatives proposed by the US Environmental Protection Agency (USEPA) for the Portland Harbor Superfund Site were scored for each metric, based upon data provided in published feasibility study (FS) documents. Metric scores were aggregated to generate scores for each value; these were then aggregated to generate scores for each pillar of sustainability. In parallel, the inferred priorities (in terms of regional remediation, restoration, planning, and development) of diverse stakeholder groups (SGs) were used to evaluate the sensitivity and robustness of the values-based sustainability assessment to diverse SG priorities. This approach, which addresses social indicators of impact and then integrates them with indicators of environmental and economic impacts, goes well beyond the Comprehensive Environmental Response, Compensation and Liability Act's (CERCLA) 9 criteria for evaluating remedial alternatives because it evaluates how remedial alternatives might be ranked in terms of the diverse values and priorities of stakeholders. This approach identified trade-offs and points of potential contention, providing a systematic, semiquantitative, transparent valuation tool that can be used in community engagement. Integr Environ Assess Manag 2018

  14. Quantum gravity removes classical singularities and shortens the life of black holes

    International Nuclear Information System (INIS)

    Frolov, V.P.; Vilkovisky, G.A.

    1979-07-01

    The problem of the gravitational collapse is considered in the framework of the quantum gravity effective action. It is shown that quantum gravity removes classical singularity and possibly shortens the lifetime of the black hole. (author)

  15. Removal action report on the Building 3001 canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    Oak Ridge National Laboratory (ORNL) is a federal facility managed by Lockheed Martin C, Energy Research, Inc., for the U.S. Department of Energy (DOE). ORNL on the Oak Ridge Reservation in East Tennessee at the Anderson and Roane County lines, approximately 38 km (24 miles) west of Knoxville, Tennessee, and 18 km (11 miles) southwest of downtown Oak Ridge. The Oak Ridge Graphite Reactor and its storage and transfer canal are located in Bldg. 3001 in the approximate center of Waste Area Grouping I in the ORNL main complex. 4:1 The Bldg. 3001 Storage Canal is an L-shaped, underground, reinforced-concrete structure running from the back and below the Graphite Reactor in Bldg. 3001 to a location beneath a hot cell in the adjacent Bldg. 3019. The Graphite Reactor was built in 1943 to produce small quantities of plutonium and was subsequently used to produce other isotopes for medical research before it was finally shut down in 1963. The associated canal was used to transport, under water, spent fuel slugs and other isotopes from the back of the reactor to the adjacent Bldg. 31319 hot cell for further processing. During its operation and years subsequent to operation, the canal's concrete walls and floor became contaminated with radioisotopes from the water.This report documents the activities involved with replacing the canal water with a solid, controlled, low-strength material (CLSM) in response to a Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action

  16. 78 FR 40959 - Removing Unnecessary Office on Violence Against Women Regulations

    Science.gov (United States)

    2013-07-09

    .... VAWA was designed to improve criminal justice system responses to domestic violence, sexual assault... Office on Violence Against Women Regulations AGENCY: Office on Violence Against Women, Justice. ACTION: Final rule. SUMMARY: This rule removes the regulations for the STOP Violence Against Indian Women...

  17. 77 FR 29579 - Removing Unnecessary Office on Violence Against Women Regulations

    Science.gov (United States)

    2012-05-18

    ... now unnecessary STOP VAIW Program regulations. Higher Education Amendments of 1998 Violence against... Office on Violence Against Women Regulations AGENCY: Office on Violence Against Women, Justice. ACTION: Proposed rule. SUMMARY: This rule proposes to remove the regulations for the STOP Violence Against Indian...

  18. Corrective Action Decision Document/ Closure Report for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Grant Evenson

    2008-09-01

    concentrations exceeding the FALs. • Polychlorinated biphenyl (PCB) contamination above the FAL was identified in the surface and/or shallow subsurface soils at the outfall and around Catch Basin 2, and in soils contained within the catch basins and the manhole at CAS 25-60-03. A corrective action of close in place with a soil removal action and use restriction (UR) was completed at CAS 25-60-03. The PCB-contaminated soils were removed from the outfall area and around Catch Basin 2, and disposed of at a Nevada Test Site landfill as part of a removal action. The catch basins and the manhole were sealed shut by filling them with grout. The end of the outfall pipe was plugged using grout, covered with soil, and the area was regraded. A UR was applied to the entire stormwater system at CAS 25-60-03, which includes the three catch basins, manhole, and associated piping. No further action is the corrective action for CASs 06-20-04, 06-99-09, and 25-64-01. The liquids in the test holes at CAS 06-99-09 were removed for disposal and the features were filled with grout as a best management practice. The drainage pipe between the vehicle washdown pad and the drainage pit at CAS 25-64-01 was sealed at each end as a best management practice. The corrective actions were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. They were judged to meet all requirements for the technical components evaluated. The corrective actions meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 556. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Maintain a UR for the entire stormwater drainage system (i.e., three catch basins, one manhole, and associated piping) at CAS 25-60-03. • No further corrective action for CAU 556. • A Notice of

  19. 77 FR 74002 - Proposed Information Collection Request; Comment Request; Technical Assistance Needs Assessments...

    Science.gov (United States)

    2012-12-12

    ... in the remedial/ removal process as possible and enable meaningful community involvement in the Superfund decision-making process. Additionally, the TANA process produces a blueprint for designing a... services to the affected community. Given the specific nature of the TANA, 8 to 10 persons will be...

  20. Phase I Source Investigation, Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, Nancy P; Evans, Nathan R

    2002-12-18

    This report represents Phase I of a multi-phase approach to a source investigation of DDT at the Heckathorn Superfund Site, Richmond, California, the former site of a pesticide packaging plant, and the adjacent waterway, the Lauritzen Channel. Potential identified sources of contamination were from sloughed material from undredged areas (such as side banks) and from outfall pipes. Objectives of Phase I included the (1) evaluation of pesticide concentrations associated with discharge from outfalls, (2) identification of additional outfalls in the area, (3) identification of type, quantity, and distribution of sediment under the Levin pier, (4) quantification of pesticide concentrations in sediment under the pier, and (5) evaluation of sediment structure and slope stability under the pier. Field operations included the collection of sediment directly from inside the mouths of outfall pipes, when possible, or the deployment of specially designed particle traps where direct sampling was problematic. Passive water samplers were placed at the end of known outfall pipes and analyzed for DDT and other pesticides of concern. Underwater dive surveys were conducted beneath the Levin pier to document type, slope, and thickness of sediment. Samples were collected at locations of interest and analyzed for contaminants. Also sampled was soil from bank areas, which were suspected of potentially contributing to continued DDT contamination of the Lauritzen Channel through erosion and groundwater leaching. The Phase I Source Investigation was successful in identifying significant sources of DDT contamination to Lauritzen Channel sediment. Undredged sediment beneath the Levin pier that has been redistributed to the channel is a likely source. Two outfalls tested bear further investigation. Not as well-defined are the contributions of bank erosional material and groundwater leaching. Subsequent investigations will be based on the results of this first phase.

  1. 75 FR 17857 - Removal of Obsolete References to Herbicides Containing Dioxin

    Science.gov (United States)

    2010-04-08

    ... Herbicides Containing Dioxin AGENCY: Department of Veterans Affairs. ACTION: Final rule. SUMMARY: The... health effects of exposure to herbicides containing dioxin and radiation to remove the obsolete references to herbicides containing dioxin. This final rule reflects changes made by the Agent Orange Act of...

  2. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada, Rev. No.: 1 with ROTC 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    David A. Strand

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 552 is comprised of the one Corrective Action Site which is 12-23-05, Ponds. One additional CAS, 12-06-04, Muckpile (G-Tunnel Muckpile), was removed from this CAU when it was determined that the muckpile is an active site. A modification to the FFACO to remove CAS 12-06-04 was approved by the Nevada Division of Environmental Protection (NDEP) on December 16, 2004. The G-Tunnel ponds were first identified in the 1991 Reynolds Electrical & Engineering Co., Inc. document entitled, ''Nevada Test Site Inventory of Inactive and Abandoned Facilities and Waste Sites'' (REECo, 1991). Corrective Action Unit 552 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Therefore, additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating and selecting the corrective action alternatives for the site. The CAI will include field inspections, radiological surveys, and sampling of appropriate media. Data will also be obtained to support investigation-derived waste (IDW) disposal and potential future waste management decisions.

  3. 75 FR 25110 - Inmate Communication With News Media: Removal of Byline Regulations

    Science.gov (United States)

    2010-05-07

    ... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 540 [BOP-1149] RIN 1120-AB49 Inmate Communication With News Media: Removal of Byline Regulations AGENCY: Bureau of Prisons, Justice Department. ACTION: Interim final rule; technical correction. [[Page 25111

  4. Superfund Record of Decision (EPA Region 7): Weldon Spring Quarry/Plant/Pits (USDOE), Weldon Spring, MO. (Second remedial action), September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The 226-acre Weldon Spring Quarry/Plant/Pits (USDOE) site is a former ordnance works and chemical plant near the city of Weldon Spring in St. Charles County, Missouri. The site is divided into two noncontiguous areas: a 217-acre chemical plant area, comprised of various buildings, ponds and four raffinate pits, and a 9-acre quarry, which forms a valley wall at the edge of the Missouri River floodplain. Since the early 1940s, the site has been used by various government agencies for chemical and ordnance processing with chemical and radioactive waste disposal in the quarry. From 1941 to 1946, the site was an Army ordnance works used for the production of trinitrotoluene (TNT) and dinitrotoluene (DNT) explosives. The selected interim remedial action for the site includes excavating an estimated 95,000 cubic yards of chemically and radioactively contaminated bulk wastes from the quarry and temporarily storing the wastes onsite in the chemical plant area; and implementing site access restrictions. The estimated total cost for the remedial action is $11,000,000

  5. Combining Ferric Salt and Cactus Mucilage for Arsenic Removal from Water.

    Science.gov (United States)

    Fox, Dawn I; Stebbins, Daniela M; Alcantar, Norma A

    2016-03-01

    New methods to remediate arsenic-contaminated water continue to be studied, particularly to fill the need for accessible methods that can significantly impact developing communities. A combination of cactus mucilage and ferric (Fe(III)) salt was investigated as a flocculation-coagulation system to remove arsenic (As) from water. As(V) solutions, ferric nitrate, and mucilage suspensions were mixed and left to stand for various periods of time. Visual and SEM observations confirmed the flocculation action of the mucilage as visible flocs formed and settled to the bottom of the tubes within 3 min. The colloidal suspensions without mucilage were stable for up to 1 week. Sample aliquots were tested for dissolved and total arsenic by ICP-MS and HGAFS. Mucilage treatment improved As removal (over Fe(III)-only treatment); the system removed 75-96% As in 30 min. At neutral pH, removal was dependent on Fe(III) and mucilage concentration and the age of the Fe(III) solution. The process is fast, achieving maximum removal in 30 min, with the majority of As removed in 10-15 min. Standard jar tests with 1000 μg/L As(III) showed that arsenic removal and settling rates were pH-dependent; As removal was between 52% (high pH) and 66% (low pH).

  6. Preparation of geopolymer-based inorganic membrane for removing Ni{sup 2+} from wastewater

    Energy Technology Data Exchange (ETDEWEB)

    Ge, Yuanyuan; Yuan, Yuan; Wang, Kaituo; He, Yan; Cui, Xuemin, E-mail: cui-xm@tsinghua.edu.cn

    2015-12-15

    Highlights: • A type free-sintering geopolymer membrane for waste water treatment was fabricated. • The geopolymer inorganic membrane held good strength and appropriate water flux. • The mechanism of removing Ni{sup 2+} combined actions of the adsorption and rejection. • The geopolymer membrane is a promising way to remove heavy metal ions in industry. - Abstract: A type of novel free-sintering and self-supporting inorganic membrane for wastewater treatment was fabricated in this study. This inorganic membrane was synthesised using metakaolin and sodium silicate solutions moulded according to a designed molar ratio (SiO{sub 2}/Al{sub 2}O{sub 3} = 2.96, Na{sub 2}O/Al{sub 2}O{sub 3} = 0.8 and H{sub 2}O/Na{sub 2}O = 19) which formed a homogenous structure and had a relative concentration pore size distribution, via scanning electron microscopy (SEM) and Brunauer–Emmett–Teller (BET) analyses. In this work, the Ni{sup 2+} removal effect of geopolymer inorganic membrane was studied under different pH value, initial concentration of Ni{sup 2+} solutions and initial operation temperature. Results showed that geopolymer inorganic membrane efficiently removes Ni{sup 2+} from wastewater because of the combined actions of the adsorption and rejection of this membrane on Ni{sup 2+} during membrane separation. Therefore, geopolymer inorganic membrane may have positive potential applications in removing Ni{sup 2+} or other heavy metal ions from aqueous industrial wastewater.

  7. Superfund Record of Decision (EPA Region 5): Midco II, Gary, IN. (First remedial action), (amendment), April 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The 7-acre Midco II site is an abandoned chemical waste storage and disposal facility in Gary, Indiana. Land use in the surrounding area is predominantly industrial. The underlying aquifer, which is used primarily for non-drinking purposes, is highly susceptible to contamination from surface sources. From 1976 to 1978, the site was used for treatment, storage, and disposal of chemical and bulk liquid wastes. The ROD amends a 1989 ROD that addressed the remaining contaminated soil, pit wastes, and ground water by treatment of an estimated 35,000 cubic yards of soil wastes. The amended remedy reduces the estimated amount of soil to be treated, as a result of new information on arsenic data and amended soil CALs, further defines the site cover requirements, and further defines the requirements for deep well injection of contaminated ground water. The primary contaminants of concern affecting the subsurface soil, sediment, and ground water are VOCs, including methylene chloride, benzene, toluene, TCE, and xylenes; other organics, including PCBs, phenols, and PAHs; and metals, including chromium, and lead. The amended remedial action for the ROD is included

  8. Comparative evaluation of the efficacy of chemomechanical caries removal agent (Papacarie and conventional method of caries removal: An in vitro study

    Directory of Open Access Journals (Sweden)

    Jawa D

    2010-06-01

    Full Text Available Painless dentistry, minimal intervention and thus giving comfort, relief and solace and instill positive attitude toward dental treatments, are some of the factors justifying the specialty of pediatric dentistry. Thus, this in vitro study was undertaken to compare the efficacy of a new chemomechanical caries removal agent, Papacarie (Formula and Acao, with conventional slow-speed rotary instrument (bur. Papacarie is a new formulation and has the main active ingredient papain, an endoprotein with bactericidal, bacteriostatic and anti-inflammatory actions. Twenty extracted human molar teeth with deep dentine caries and no enamel coverage were selected for the study. After the preparation of the teeth and removal of the caries with the respective methods, they were decalcified, dehydrated and embedded in paraffin blocks for histologic studies. Serial sections of 5 μm thickness were examined for the presence of bacteria under light microscope. Though complete removal of caries was achieved significantly in both the methods, there was less marked destruction of dentinal tubules in chemomechanical caries removal method by Papacarie. Thus, Papacarie is recommended as an efficient, easy to perform, comfortable and less destructive solution for the patient seeking an alternative to the conventional method.

  9. Estimating risk at a Superfund site contaminated with radiological and chemical wastes

    International Nuclear Information System (INIS)

    Temeshy, A.; Liedle, J.M.; Sims, L.M.; Efird, C.R.

    1992-01-01

    This paper describes the method and results for estimating carcinogenic and noncarcinogenic effects at a Superfund site that is radiologically and chemically contaminated. Risk to receptors from disposal of waste in soil and resulting contamination of groundwater, air, surface water, and sediment is quantified. Specific risk assessment components which are addressed are the exposure assessment, toxicity assessment, and the resulting risk characterization. In the exposure assessment, potential exposure pathways are identified using waste disposal inventory information for soil and modeled information for other media. Models are used to calculate future radionuclide concentrations in groundwater, soil, surface water and air. Chemical exposure concentrations are quantified using site characterization data. Models are used to determine concentrations of chemicals in surface water and in air. Toxicity parameters used to quantify the dose-response relationship associated with the carcinogenic contaminants are slope factors and with noncarcinogenic contaminants are reference doses. In the risk characterization step, results from the exposure assessment and toxicity assessment are summarized and integrated into quantitative risk estimates for carcinogens and hazard induces for noncarcinogens. Calculated risks for carcinogenic contaminants are compared with EPA's target risk range. At WAG 6, the risk from radionuclides and chemicals for an on-WAG homesteader exceeds EPA's target risk range. Hazard indices are compared to unity for noncarcinogenic contaminants. At WAG 6, the total pathway hazard index for the on-WAG homesteader exceeds unity

  10. Technical Specification action statements requiring shutdown

    International Nuclear Information System (INIS)

    Mankamo, T.; Kim, I.S.; Samanta, P.K.

    1993-11-01

    When safety systems fail during power operation, the limiting conditions for operation (LCOs) and associated action statements of technical specifications typically require that the plant be shut down within the limits of allowed outage time (AOT). However, when a system needed to remove decay heat, such as the residual heat removal (RHR) system, is inoperable or degraded, shutting down the plant may not necessarily be preferable, from a risk perspective, to continuing power operation over a usual repair time, giving priority to the repairs. The risk impact of the basic operational alternatives, i.e., continued operation or shutdown, was evaluated for failures in the RHR and standby service water (SSW) systems of a boiling-water reactor (BWR) nuclear power plant. A complete or partial failure of the SSW system fails or degrades not only the RHR system but other front-line safety systems supported by the SSW system. This report presents the methodology to evaluate the risk impact of LCOs and associated AOT; the results of risk evaluation from its application to the RHR and SSW systems of a BWR; the findings from the risk-sensitivity analyses to identify alternative operational policies; and the major insights and recommendations to improve the technical specifications action statements

  11. Removal of the Plutonium Recycle Test Reactor - 13031

    International Nuclear Information System (INIS)

    Herzog, C. Brad; Guercia, Rudolph; LaCome, Matt

    2013-01-01

    The 309 Facility housed the Plutonium Recycle Test Reactor (PRTR), an operating test reactor in the 300 Area at Hanford, Washington. The reactor first went critical in 1960 and was originally used for experiments under the Hanford Site Plutonium Fuels Utilization Program. The facility was decontaminated and decommissioned in 1988-1989, and the facility was deactivated in 1994. The 309 facility was added to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response actions as established in an Interim Record of Decision (IROD) and Action Memorandum (AM). The IROD directs a remedial action for the 309 facility, associated waste sites, associated underground piping and contaminated soils resulting from past unplanned releases. The AM directs a removal action through physical demolition of the facility, including removal of the reactor. Both CERCLA actions are implemented in accordance with U.S. EPA approved Remedial Action Work Plan, and the Remedial Design Report / Remedial Action Report associated with the Hanford 300-FF-2 Operable Unit. The selected method for remedy was to conventionally demolish above grade structures including the easily distinguished containment vessel dome, remove the PRTR and a minimum of 300 mm (12 in) of shielding as a single 560 Ton unit, and conventionally demolish the below grade structure. Initial sample core drilling in the Bio-Shield for radiological surveys showed evidence that the Bio-Shield was of sound structure. Core drills for the separation process of the PRTR from the 309 structure began at the deck level and revealed substantial thermal degradation of at least the top 1.2 m (4LF) of Bio-Shield structure. The degraded structure combined with the original materials used in the Bio-Shield would not allow for a stable structure to be extracted. The water used in the core drilling process proved to erode the sand mixture of the Bio-Shield leaving the steel aggregate to act as ball bearings against the

  12. Remedial action of radium contaminated residential properties

    International Nuclear Information System (INIS)

    White, D.; Eng, J.

    1986-01-01

    Since November 1983, the New Jersey Department of Environmental Protection (NJDEP) and the US Environmental Protection Agency (USEPA) have been in the process of identifying properties in Montclair, Glen Ridge and West Orange, New Jersey, which were built over radium contaminated soil landfilled areas. Elevated indoor radon concentrations prompted the Centers for Disease Control (CDC) to issue a health advisory which included permanent remediation of radon progeny levels in excess of 0.02 Working Levels within two years of discovery. In order to expedite remedial action, NJDEP undertook a ten million dollar cleanup program. Remedial Action at the 12 residential properties encountered some unanticipated problems despite the efforts of numerous government agencies and their contractors to characterize the contamination as much as possible prior to remediation. Some of the unanticipated issues include contamination from other radionuclides, underestimation of removal volumes, and controversy over the transportation and disposal of the radium contaminated soil at a commercial facility in Nevada. This paper will review the approach taken by NJDEP to the remedial action for radium contaminated soil, discuss some of the issues encountered during the remedial action, and provide post remedial action data

  13. Chemical oxygen demand removal efficiency and limited factors study of aminosilicone polymers in a water emulsion by iron-carbon micro-electrolysis.

    Science.gov (United States)

    Yang, Shangyuan; Liang, Zhiwei; Yu, Huadong; Wang, Yunlong; Chen, Yingxu

    2014-02-01

    Micro-electrolysis was applied in the present study to investigate the effect of pH, iron-carbon mass ratio, contact time, and treatment batch on the removal efficiency of chemical oxygen demand (COD) within an aminosilicone emulsion. The results exhibited that the removal efficiency of COD decreased linearly with the batch increase, and this tendency was consistent under the various conditions. The adsorption of activated carbons contributes a large portion to the elimination of COD within the aminosilicone emulsion. The oxidation action of iron-carbon micro-electrolysis was proven and the aminosilicone emulsion's COD removal contribution was approximately 16%. Aminosilicone polymers were adsorbed on the surface of activated carbons and iron chips, which contributes to the decline of COD removal efficiency and limits the contribution of oxidation action.

  14. Superfund Record of Decision (EPA region 4): North Hollywood Dump, TN. (First remedial action), September 1990. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-13

    The 70-acre North Hollywood Dump site is an inactive, privately owned landfill in Memphis, Shelby County, Tennessee, in the Wolf River floodplain. Directly beneath the site is a contaminated aquifer from which ground water discharges directly to the Wolf River. From the mid-1930s until its closure in 1967, municipal and industrial refuse were disposed of at the site, which was operated by the city of Memphis. A precise description of the materials disposed of is unknown. In 1979 and 1980, EPA and State studies revealed various contaminants both onsite and offsite in soil, sediments, ground water, surface water, and fish. Commercial fishing activities in the Wolf River ceased, and EPA required removal of contaminated soil, capping of the landfill, and fencing of the site. The Record of Decision (ROD) addresses all of the contaminated media by containing the source areas. The primary contaminants of concern affecting the soil, sediment, debris, ground water, and surface water are organics including aldrin, endrin, chlordane, and pesticides; and metals including arsenic and lead.

  15. Five-Year Review of CERCLA Response Actions at the Idaho National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    W. L. Jolley

    2007-02-01

    This report summarizes the documentation submitted in support of the five-year review or remedial actions implemented under the Comprehensive Environmental Response, Compensation, and Liability Act Sitewide at the Idaho National Laboratory. The report also summarizes documentation and inspections conducted at the no-further-action sites. This review covered actions conducted at 9 of the 10 waste area groups at the Idaho National Laboratory, i.e. Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 9, and 10. Waste Area Group 8 was not subject to this review, because it does not fall under the jurisdiction of the U.S. Department of Energy Idaho Operations Office. The review included past site inspections and monitoring data collected in support of the remedial actions. The remedial actions have been completed at Waste Area Groups 2, 4, 5, 6, and 9. Remedial action reports have been completed for Waste Area Groups 2 and 4, and remedial action reports are expected to be completed during 2005 for Waste Area Groups 1, 5, and 9. Remediation is ongoing at Waste Area Groups 3, 7, and 10. Remedial investigations are yet to be completed for Operable Units 3-14, 7-13/14, and 10-08. The review showed that the remedies have been constructed in accordance with the requirements of the Records of Decision and are functioning as designed. Immediate threats have been addressed, and the remedies continue to be protective. Potential short-term threats are being addressed though institutional controls. Soil cover and cap remedies are being maintained properly and inspected in accordance with the appropriate requirements. Soil removal actions and equipment or system removals have successfully achieved remedial action objectives identified in the Records of Decision. The next Sitewide five-year review is scheduled for completion by 2011.

  16. 78 FR 73449 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-12-06

    ... Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the soil of 1,154 residential...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Omaha Lead Superfund Site AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...

  17. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed

  18. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was

  19. Program management strategies for following EPA guidance for remedial design/remedial action at DOE sites

    International Nuclear Information System (INIS)

    Hopper, J.P.; Chew, J.R.; Kowalski, T.E.

    1991-01-01

    At the US Department of Energy (DOE) facilities, environmental restoration is being conducted in accordance with Federal Facilities Compliance Agreements (or Interagency Agreements). These agreements establish a cooperative working relationship and often define roles, responsibilities and authorities for conduct and oversight of the Remedial Action Programs. The US Environmental Protection Agency (EPA) has guidelines on how to initiate and perform remedial actions for sites they are remediating under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) as amended by the Superfund Amendments and Re-Authorization Act (SARA). This paper addresses some of the difference and commonalities between the DOE project management procedures and EPA guidance documents. This report covers only the RD/RA phase of environmental restoration. On the surface, there are many apparent differences between the DOE and EPA project management processes. Upon closer review, however, many of the differences are the result of applying different terminology to the same phase of a project. By looking for the similarities in the two processes rather than hunting for differences, many communication problems are avoided. Understanding both processes also aids in figuring out when, how and to what extent EPA should participate in the RD/RA phase for DOE lead cleanup activities. The DOE Remedial Design and Remedial Action process is discussed in a stepwise manner and compared to the EPA process. Each element of the process is defined. Activities common to both the EPA and DOE are correlated. The annual DOE budget cycle for remediation projects and the four-year cycle for appropriation of remediation funds are discussed, and the constraints of this process examined. DOE orders as well as other requirements for RD/RA activities are summarized and correlated to EPA regulations where this is possible

  20. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  1. Simultaneous electrodialytic removal of PAH, PCB, TBT and heavy metals from sediments.

    Science.gov (United States)

    Pedersen, Kristine B; Lejon, Tore; Jensen, Pernille E; Ottosen, Lisbeth M

    2017-08-01

    Contaminated sediments are remediated in order to protect human health and the environment, with the additional benefit of using the treated sediments for other activities. Common for many polluted sediments is the contamination with several different pollutants, making remediation challenging with the need of different remedial actions for each pollutant. In this study, electrodialytic remediation (EDR) of sediments was found effective for simultaneous removal of heavy metals and organic pollutants for sediments from Arctic regions - Sisimiut in Greenland and Hammerfest in Norway. The influence of sediment properties and experimental settings on the remediation process was studied by employing multivariate analysis. The importance of the variables studied varied with the pollutant and based on these results it was possible to assess removal processes for the different pollutants. Desorption was found to be important for the removal of heavy metals and TBT, while photolysis was significant for removal of PAH, PCB and TBT. In addition, dechlorination was found to be important for the removal of PCB. The highest removal efficiencies were found for heavy metals, TBT and PCB (>40%) and lower removal efficiencies for PAH (<35%). Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. The action of chemical and mechanical stresses on single and dual species biofilm removal of drinking water bacteria.

    Science.gov (United States)

    Gomes, I B; Lemos, M; Mathieu, L; Simões, M; Simões, L C

    2018-08-01

    The presence of biofilms in drinking water distribution systems (DWDS) is a global public health concern as they can harbor pathogenic microorganisms. Sodium hypochlorite (NaOCl) is the most commonly used disinfectant for microbial growth control in DWDS. However, its effect on biofilm removal is still unclear. This work aims to evaluate the effects of the combination of chemical (NaOCl) and mechanical stresses on the removal of single and dual species biofilms of two bacteria isolated from DWDS and considered opportunistic, Acinectobacter calcoaceticus and Stenotrophomonas maltophilia. A rotating cylinder reactor was successfully used for the first time in drinking water biofilm studies with polyvinyl chloride as substratum. The single and dual species biofilms presented different characteristics in terms of metabolic activity, mass, density, thickness and content of proteins and polysaccharides. Their complete removal was not achieved even when a high NaOCl concentrations and an increasing series of shear stresses (from 2 to 23Pa) were applied. In general, NaOCl pre-treatment did not improve the impact of mechanical stress on biofilm removal. Dual species biofilms were colonized mostly by S. maltophilia and were more susceptible to chemical and mechanical stresses than these single species. The most efficient treatment (93% biofilm removal) was the combination of NaOCl at 175mg·l -1 with mechanical stress against dual species biofilms. Of concern was the high tolerance of S. maltophilia to chemical and mechanical stresses in both single and dual species biofilms. The overall results demonstrate the inefficacy of NaOCl on biofilm removal even when combined with high shear stresses. Copyright © 2018 Elsevier B.V. All rights reserved.

  3. Laser-assisted hair removal for facial hirsutism in women: A review of evidence.

    Science.gov (United States)

    Lee, Chun-Man

    2018-06-01

    Poly cystic ovarian syndrome (PCOS) has been described as the common diagnosis for hirsutism in women. Facial hirsutism is by far the most distressing symptom of hyperandrogenism in women with PCOS. A statistically significant improvement in psychological well-being has been reported in patients with PCOS allocated for laser-assisted hair removal. The theory of selective photothermolysis has revolutionized laser hair removal in that it is effective and safe, when operated by sufficiently trained and experienced professionals. Long-pulsed ruby (694 nm), long-pulsed alexandrite (755 nm), diode (800-980 nm), and long-pulsed Nd:YAG (1064 nm) are commercially available laser devices for hair removal most widely studied. This article will introduce the fundamentals and mechanism of action of lasers in hair removal, in a contemporary literature review looking at medium to long term efficacy and safety profiles of various laser hair removal modalities most widely commercially available to date.

  4. Geophysical logging and thermal imaging near the Hemphill Road TCE National Priorities List Superfund site near Gastonia, North Carolina

    Science.gov (United States)

    Antolino, Dominick J.; Chapman, Melinda J.

    2017-03-27

    Borehole geophysical logs and thermal imaging data were collected by the U.S. Geological Survey near the Hemphill Road TCE (trichloroethylene) National Priorities List Superfund site near Gastonia, North Carolina, during August 2014 through February 2015. In an effort to assist the U.S. Environmental Protection Agency in the development of a conceptual groundwater model for the assessment of current contaminant distribution and future migration of contaminants, surface geological mapping and borehole geophysical log and thermal imaging data collection, which included the delineation of more than 600 subsurface features (primarily fracture orientations), was completed in five open borehole wells and two private supply bedrock wells. In addition, areas of possible groundwater discharge within a nearby creek downgradient of the study site were determined based on temperature differences between the stream and bank seepage using thermal imagery.

  5. Novel fat-link fermion actions for lattice QCD

    International Nuclear Information System (INIS)

    Zanotti, J.; Bilson-Thompson, S.; Bonnet, F.; Leinweber, D.; Melnitchouk, W.; Williams, A.

    2000-01-01

    Full text: We are currently exploring new ideas for lattice fermion actions. Naive implementations of fermion actions encounter the well known fermion-doubling problem. In order to solve this problem, Wilson introduced an irrelevant (energy) dimension-five operator (the so-called Wilson term) which explicitly breaks chiral symmetry. The scaling properties of this Wilson action can be improved by introducing any number of irrelevant operators of increasing dimension which also vanish in the continuum limit. In this manner, one can improve fermion actions at finite 'a' by combining operators to eliminate O(a) and perhaps O(a 2 ) errors etc. A popular formulation of a lattice fermion action that achieves this is the Clover action which removes the O(a) error introduced by the Wilson term by introducing an additional irrelevant dimension-five operator. The Clover action can be O(a) improved to all orders in the strong coupling 'g'. While the Clover action displays excellent scaling, it is responsible for revealing the exceptional configuration problem where the quark propagator encounters singular behaviour particularly as the quark mass becomes small. Moreover, its free dispersion relation between energy and momentum is unchanged from the standard Wilson action dispersion and shows a continuum like behaviour only for relatively small momenta [F. X. Lee and D. B. Leinweber, Phys. Rev. D59, 074504 (1999), hep-lat/9711044]. Finally, significant chiral symmetry breaking is apparent as the renormalised quark mass differs significantly from the bare mass of the theory. Hence we propose a different approach to fermion action improvement. One in which the additive renormalisations become small while expressing good chiral behaviour. This can be achieved through the consideration of 'fat-link' fermion actions [T. DeGrand (the MILC collaboration, Phys. Rev. D60, 094501 (1999)]. Fat links are created by averaging or smearing links on the lattice with their nearest neighbours in

  6. Removing user fees in the health sector: a review of policy processes in six sub-Saharan African countries.

    Science.gov (United States)

    Meessen, Bruno; Hercot, David; Noirhomme, Mathieu; Ridde, Valéry; Tibouti, Abdelmajid; Tashobya, Christine Kirunga; Gilson, Lucy

    2011-11-01

    In recent years, governments of several low-income countries have taken decisive action by removing fully or partially user fees in the health sector. In this study, we review recent reforms in six sub-Saharan African countries: Burkina Faso, Burundi, Ghana, Liberia, Senegal and Uganda. The review describes the processes and strategies through which user fee removal reforms have been implemented and tries to assess them by referring to a good practice hypotheses framework. The analysis shows that African leaders are willing to take strong action to remove financial barriers met by vulnerable groups, especially pregnant women and children. However, due to a lack of consultation and the often unexpected timing of the decision taken by the political authorities, there was insufficient preparation for user fee removal in several countries. This lack of preparation resulted in poor design of the reform and weaknesses in the processes of policy formulation and implementation. Our assessment is that there is now a window of opportunity in many African countries for policy action to address barriers to accessing health care. Mobilizing sufficient financial resources and obtaining long-term commitment are obviously crucial requirements, but design details, the formulation process and implementation plan also need careful thought. We contend that national policy-makers and international agencies could better collaborate in this respect.

  7. 76 FR 44580 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Science.gov (United States)

    2011-07-26

    ... FURTHER INFORMATION CONTACT: Lois Gartner, Assessment and Remediation Division, Office of Superfund... capacities of state action and administration of community activities at Fund-lead NPL sites. Remedial... at new and ongoing state-lead sites and at all state-lead, Federal-lead and Federal Facility sites...

  8. Superfund record of decision (EPA Region 7): Weldon Spring Quarry/Plant/Pits (USDOE), St. Charles, MO, September 30, 1998

    International Nuclear Information System (INIS)

    1999-03-01

    The Weldon Spring Quarry is one of two noncontiguous areas that constitute the US Department of Energy's (DOE) Weldon Spring site. The main area of the site is the chemical plant. Both areas are located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The US Environmental Protection Agency (EPA) listed the quarry on the National Priorities List (NPL) in 1987, and the chemical plant area was added to the list in 1989. The quarry is about 6.4 km (4 mi) south-southwest of the chemical plant area; it is accessible from State Route 94 and is currently fenced and closed to the public. The quarry is approximately 300 m (1,000 ft) long by 140 m (450 ft) wide and covers an area of approximately 3.6 ha (9 acres). The quarry was used by the Army for disposal of chemically contaminated (explosive) materials in the 1940s and was later used for the disposal of radioactively contaminated material by the Atomic Energy Commission (AEC) in the 1960s. Approximately 110,000 m 3 (144,000 yd 3 ) of soil and waste material was removed from the quarry and transported to the chemical plant area as part of completing the remedial action stipulated in the Record of Decision (ROD) for the Quarry Bulk Waste Operable Unit (DOE 1990). Bulk waste removal was completed in October 1995. These wastes have been placed in the disposal cell at the chemical plant. Prior to bulk waste removal, contaminated water contained in the quarry pond was also removed; approximately 170 million liters (44 million gal) have been treated as of March 1998

  9. 75 FR 21163 - Inmate Communication With News Media: Removal of Byline Regulations

    Science.gov (United States)

    2010-04-23

    ... Communication With News Media: Removal of Byline Regulations AGENCY: Bureau of Prisons, Justice. ACTION: Interim... anything of value for correspondence with the news media. The inmate may not act as reporter or publish... correspondence with representatives of the news media. * * * * * (b) The inmate may not receive compensation or...

  10. Wet-cupping removes oxidants and decreases oxidative stress.

    Science.gov (United States)

    Tagil, Suleyman Murat; Celik, Huseyin Tugrul; Ciftci, Sefa; Kazanci, Fatmanur Hacievliyagil; Arslan, Muzeyyen; Erdamar, Nazan; Kesik, Yunus; Erdamar, Husamettin; Dane, Senol

    2014-12-01

    Wet-cupping therapy is one of the oldest known medical techniques. Although it is widely used in various conditions such as acute\\chronic inflammation, infectious diseases, and immune system disorders, its mechanism of action is not fully known. In this study, we investigated the oxidative status as the first step to elucidate possible mechanisms of action of wet cupping. Wet cupping therapy is implemented to 31 healthy volunteers. Venous blood samples and Wet cupping blood samples were taken concurrently. Serum nitricoxide, malondialdehyde levels and activity of superoxide dismutase and myeloperoxidase were measured spectrophotometrically. Wet cupping blood had higher activity of myeloperoxidase, lower activity of superoxide dismutase, higher levels of malondialdehyde and nitricoxide compared to the venous blood. Wet cupping removes oxidants and decreases oxidative stress. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. Modelling Cr(VI) removal by a combined carbon-activated sludge system

    International Nuclear Information System (INIS)

    Orozco, A. Micaela Ferro; Contreras, Edgardo M.; Zaritzky, Noemi E.

    2008-01-01

    The combined carbon-activated sludge process has been proposed as an alternative to protect the biomass against toxic substances in wastewaters; however, the information about the effect of powdered-activated carbon (PAC) addition in activated sludge reactors for the treatment of wastewaters containing Cr(VI) is limited. The objectives of the present study were: (a) to evaluate the removal of hexavalent chromium by (i) activated sludge microorganisms in aerobic batch reactors, (ii) powdered-activated carbon, and (iii) the combined action of powdered-activated carbon and biomass; (b) to propose mathematical models that interpret the experimental results. Different Cr(VI) removal systems were tested: (S1) biomass (activated sludge), (S2) PAC, and (S3) the combined activated carbon-biomass system. A Monod-based mathematical model was used to describe the kinetics of Cr(VI) removal in the system S1. A first-order kinetics with respect to Cr(VI) and PAC respectively, was proposed to model the removal of Cr(VI) in the system S2. Cr(VI) removal in the combined carbon-biomass system (S3) was faster than both Cr(VI) removal using PAC or activated sludge individually. Results showed that the removal of Cr(VI) using the activated carbon-biomass system (S3) was adequately described by combining the kinetic equations proposed for the systems S1 and S2

  12. Removal site evaluation report on Building 3019B at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This removal site evaluation report on Building 3019B at Oak Ridge National Laboratory was prepared to provide the environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the facility pose a substantial risk to human health or the environment and whether remedial site evaluations or removal actions are, therefore, required. The scope of the project included (1) a search for, and review of, readily available historical records regarding operations and use of the facility (including hazardous substance usage and existing contamination); (2) interviews with facility personnel concerning current and past practices; and (3) a brief walk-through to visually inspect the facility nd identify existing hazard areas requiring maintenance actions or remedial evaluation. The results of the removal site evaluation indicate that areas inside Building 3019B pose no imminent hazard because adequate engineering and administrative controls are in place and enforced within the facility to ensure worker and environmental protection. A maintenance action, however, is being undertaken or proposed. Deteriorated and peeling exterior paint in areas on the west and south walls on the exterior of the building has an uninhibited pathway to the storm water drainage system and can potentially impact the local surface water during periods of storm water runoff. The paint is assumed to be lead based, thus posing a potential problem. In addition, the subsurface of all of the exterior walls may be radiologically contaminated. A maintenance action will be necessary to prevent further deterioration and dislodging of the paint

  13. Radiological assessment and remedial action report for the ''Son of Lansdowne'' property, 186 North Lansdowne Avenue, Lansdowne, Pennsylvania

    International Nuclear Information System (INIS)

    Smith, W.H.; Wynveen, R.A.

    1987-08-01

    This document reports the results of a radiological assessment and remedial action program conducted by Argonne National Laboratory personnel at a radioactively contaminated private residence in Lansdowne, Pennsylvania. The program was conducted on the residence at 186 Lansdowne Avenue. The survey conducted by the ANL personnel indicated that several dozen areas or spots of contamination were present on all floors and the basement of the three-story house. Contamination was found on furniture, carpeting, walls, floors, woodwork, and ceilings. Remedial action undertaken to remove the contamination ranged from scrubbing, to scraping, to shaving of wood, to removal and disposal of items and material that could not be adequately decontaminated. Outdoors, contaminated soil was removed from the backyard, and the driveway was dug up so the contaminated subsurface material could be removed. The remedial action generated quantities of radioactive waste, including four 55-gallon drums and one M-III bin (120 ft 3 ) containing floor tile, concrete, personal items, furniture, floor scrapings, vermiculite absorbed scrub water, and other items. In addition, there were 24 M-III bins containing approximately 112 tons of contaminated soil and rock from the two contaminated areas in the backyard and from the contaminated subsurface of the driveway. 2 refs., 39 figs., 12 tabs

  14. An Illustration of the Corrective Action Process, The Corrective Action Management Unit at Sandia National Laboratories/New Mexico

    International Nuclear Information System (INIS)

    Irwin, M.; Kwiecinski, D.

    2002-01-01

    Corrective Action Management Units (CAMUs) were established by the Environmental Protection Agency (EPA) to streamline the remediation of hazardous waste sites. Streamlining involved providing cost saving measures for the treatment, storage, and safe containment of the wastes. To expedite cleanup and remove disincentives, EPA designed 40 CFR 264 Subpart S to be flexible. At the heart of this flexibility are the provisions for CAMUs and Temporary Units (TUs). CAMUs and TUs were created to remove cleanup disincentives resulting from other Resource Conservation Recovery Act (RCRA) hazardous waste provisions--specifically, RCRA land disposal restrictions (LDRs) and minimum technology requirements (MTRs). Although LDR and MTR provisions were not intended for remediation activities, LDRs and MTRs apply to corrective actions because hazardous wastes are generated. However, management of RCRA hazardous remediation wastes in a CAMU or TU is not subject to these stringent requirements. The CAMU at Sandia National Laboratories in Albuquerque, New Mexico (SNL/NM) was proposed through an interactive process involving the regulators (EPA and the New Mexico Environment Department), DOE, SNL/NM, and stakeholders. The CAMU at SNL/NM has been accepting waste from the nearby Chemical Waste Landfill remediation since January of 1999. During this time, a number of unique techniques have been implemented to save costs, improve health and safety, and provide the best value and management practices. This presentation will take the audience through the corrective action process implemented at the CAMU facility, from the selection of the CAMU site to permitting and construction, waste management, waste treatment, and final waste placement. The presentation will highlight the key advantages that CAMUs and TUs offer in the corrective action process. These advantages include yielding a practical approach to regulatory compliance, expediting efficient remediation and site closure, and realizing

  15. Role of institutional controls in selection of remedial measures

    International Nuclear Information System (INIS)

    Bakr, A.A.; Agoston, E.N.; McLeod, R.V.; Hicks, H.T.

    1992-01-01

    This paper explores the regulatory intent of CERCLA's definition and applicability of institutional controls at hazardous substance release sites undergoing remedial action and institutional controls that have been defined and implemented at selected CERCLA (Superfund) sites in the United States. Under provisions of CERCLA, institutional controls can be components of, or supplements to, interim or final remedial measures for hazardous substance [as defined under CERCLA 101(14)] releases. The use of institutional controls has been proposed in a number of RODs for large Superfund sites (e.g., Times Beach, Missouri; the Clothier Disposal Site in Oswego County, New York; and the Wildcat Landfill in Kent County, Delaware). In these cases, the selected remedial actions combine active response measures with institutional controls to protect human health and the environment. These RODs provide insight to how widely the concept of institutional controls is used and under what conditions. The use of institutional controls at large federal facilities is also discussed

  16. Bio-mechanical removing of contaminated soils: a field experiment

    International Nuclear Information System (INIS)

    Jouve, A.; Maubert, H.; Schulte, E.

    1992-01-01

    If, in spite of safety precautions, a major nuclear accident would occur, countermeasures should be taken to attenuate the impact of radioactive deposits. The European RESSAC program (REhabilitation of Soils and Surfaces after an ACcident) aims at studying actions for normal life return in contaminated zones. One of them, called the Decontaminating Vegetal Network (D.V.N.) associates the biological action of turfing plants, producing a dense root-network capable to trap the top contaminated soil particles, and the mechanical efficiency of a turf harvester which can remove only 1 cm of soil. This performance, not associated with other techniques of soil removal such as scrapers or bulldozers, leads to minimize the waste production. The D.V.N is a vegetal cover spread over the contaminated soil, using the hydro-seeding technique. The growing plants are forming a pleasant lawn which may have a positive impact on the public opinion compared to techniques using bitumen mixtures to cover the soil. Field experiments involving labelling solutions of stable molybdenum salts simulating the contamination of the soil have shown that this technique can be applied as well on homogeneous cultivated soil surfaces as on roughly ploughed soils. 4 refs., 3 figs., 2 tabs

  17. Post Remedial Action Report, Lansdowne Radioactive Residence Complex, Dismantlement/Removal Project. Volume 1. Government Operations

    Science.gov (United States)

    1990-06-01

    to molecules of-hydrogen peroxide (and other oxydizing agents) which may produce other chemical reactions abnormal to the cells functioning. t If...antique mahogany furniture were carried from the house down to the OSF and successfully decontaminated by removing the finish with isopropyl alcohol (Figs

  18. Uranium mill tailings remedial action technology

    International Nuclear Information System (INIS)

    Hartley, J.N.; Gee, G.W.

    1984-01-01

    The uranium milling process involves the hydrometallurgical extraction of uranium from ores and the resultant generation of large quantities of waste referred to as tailings. Uranium mill tailings have been identified as requiring remediation because they contain residual radioactive material that is not removed in the milling process. Potential radiation exposure can result from direct contact with the tailings, from radon gas emitted by the tailings, and from radioactive contamination of groundwater. As a result, the technology developed under the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP) and the US Nuclear Regulatory Commission (NRC) Uranium Recovery Program have focused on radon control, groundwater contamination and the long-term protection of the containment system. This paper briefly summarizes the UMTRAP and NRC remedial action technology development. 33 references, 9 figures, 5 tables

  19. Strike action by nurses in South Africa: A value clarification

    Directory of Open Access Journals (Sweden)

    Marie Muller

    2001-09-01

    Full Text Available The Labour Relations Act (South Africa, 1991 made provision for protected strike action by employees, subject to certain conditions, procedures and negotiated agreements. This led to the removal of the strike clause in the Nursing Act (South Africa, 1992. The labour rights of all citizens are entrenched in the Constitution of the country (South Africa, 1996. Participation in strike action by the nurse/ midwife, regardless of the legal requirements and specifications, does, however, pose an ethical question. It is therefore necessary to conduct a value clarification on strike action by nurses in South Africa. The purpose of this research is to explore and describe the perceived values of participants from an accessible population on this phenomenon. A qualitative, exploratory and descriptive research design was deployed. The perceived values of nurses on strike action were collected by means of an openended questionnaire/sketch. Over a period of three years a purposive and convenient sampling method was used, involving all the enrolled post basic nursing/midwifery students/ learners at a particular Nursing Education Institution. The justification of the sample was further enhanced by also collecting data on the participants’ age and provincial distribution location. Although a 63% sample realisation (of the accessible population was achieved, this represents only 1,5% of the registered nursing/midwifery population in the country. A descriptive analysis of the participants’ age and provincial distribution was undertaken, as well as a content analysis of their perceived values on strike action. The mean age of the participants was 48 years, which could be attributed to the fact that most of them were enrolled for a post-basic Diploma in Community Nursing Science. Most of the responses (52,7% were against strike action and 32,5% supported strike action by nurses as a constitutional and legal right. A fairly substantial number of participants (14

  20. Superfund Record of Decision (EPA Region 2): Woodland Township Route 72 site, Burlington County, New Jersey (first remedial action), May 16, 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The 12-acre Woodland Route 72 Dump site is an abandoned hazardous waste dump in Woodland Township, Burlington County, New Jersey. The site is being remediated concurrently with another abandoned dump. Several chemical manufacturing firms dumped chemicals and other wastes into trenches and lagoons or burned the waste at the sites from the early 1950s to 1962. The primary contaminants of concern affecting the surface soil, sediment, sludge, debris, and ground water are VOCs including benzene, toluene, TCE and xylenes; organics including PAHs, pesticides, and phenols; radionuclides (e.g., uranium and thorium series); and metals including lead and chromium. The selected remedial action for the site includes excavation, further characterization, and offsite disposal at a permitted facility of 54,000 cubic yards (total from both sites) of contaminated surface soil, sludges, debris and sediment; offsite disposal of 19 cubic yards (total from both sites) of radiologically contaminated surface materials including a drum of radioactive pellets; ground water pumping and treatment with treatment to be determined during design. The total estimated present worth cost for the concurrent remedial actions at the Route 72 and Route 532 sites is $142,200,000

  1. Chemical dechlorination of pesticides at a superfund site in Region II

    International Nuclear Information System (INIS)

    Pendergrass, S.; Prince, J.

    1991-01-01

    Selecting technologies for cleaning up hazardous waste sites is a complex task, due in part to the rapidly changing nature of the state-of-the-art in technology. There is strong support for use of innovative technologies as specified in Section 121(b) of CERCLA. However, use of an innovative technology requires overcoming a variety of challenges. These challenges include: Screening potentially appropriate technologies, including innovative technologies, and selecting one or more potential innovative technologies for which preliminary results are promising; however, site-specific data are needed prior to technology evaluation. Evaluating the effectiveness of the proposed technology for the site through the use of treatability studies. Gaining acceptance for the innovative technology, which may employ new or unfamiliar concepts. Determining optimal design and operating parameters for full-scale remediation. This paper discusses the technology evaluation process and how that process supported the selection of an innovative technology for the Myers Property site, a Superfund site in Region II. A case study is presented showing how technology screening and laboratory treatability studies were used to evaluate an innovative technology (chemical dechlorination), which was selected as the technology for remediation of soils and sediments contaminated with pesticides at this environmentally sensitive site in New Jersey. The remedy selected by the U.S. EPA for this site designates chemical dechlorination as the selected technology, but does not specify any particular vendor or process. Rather, the remedy sets forth technology performance standards and recommends certain design tasks which may be used to select a particular chemical process. This paper discusses he of these design tasks as they might apply to innovative technologies, using chemical dechlorination as a model

  2. Biota Modeling in EPA's Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

    International Nuclear Information System (INIS)

    Manning, Karessa L.; Dolislager, Fredrick G.; Bellamy, Michael B.

    2016-01-01

    The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level tools that set forth Environmental Protection Agency's (EPA) recommended approaches, based upon currently available information with respect to risk assessment, for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has a residential gardening scenario and subsistence farmer exposure scenarios that require modeling of the transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC exposure scenarios. Recent improvements have been made in the biota modeling for these calculators, including newly derived biota intake rates, more comprehensive soil mass loading factors (MLFs), and more comprehensive soil to tissue transfer factors (TFs) for animals and soil to plant transfer factors (BV's). New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

  3. 77 FR 19932 - Inmate Communication With News Media: Removal of Byline Regulations

    Science.gov (United States)

    2012-04-03

    ... Communication With News Media: Removal of Byline Regulations AGENCY: Bureau of Prisons, Justice. ACTION: Final... media and the inmate, for which the inmate is compensated. But the scope of this lawsuit does not... because the inmate publishes a writing under a byline in the news media is much more remote. Id. at 1123...

  4. Engineering evaluation/cost analysis for the proposed removal of contaminated materials from Pad 1 at the Elza Gate site, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1990-06-01

    This engineering evaluation/cost analysis (EE/CA) has been prepared in support of the proposed removal action for cleanup of radioactively contaminated concrete and soil beneath a building on privately owned commercial property in Oak Ridge, Tennessee. The property, known as the Elza Gate site, became contaminated with uranium-238, radium-226, thorium-232, thorium-230, and decay products as a result of the Manhattan Engineer District storing uranium ore and ore processing residues at the site in the early 1940s. The US Department of Energy (DOE) has responsibility for cleanup of the property under its Formerly Utilized Sites Remedial Action Program (FUSRAP). The DOE plans to remove the cracked and worn concrete pad and contaminated subsoil beneath the pad, after which the property owner/tenant will provide clean backfill and new concrete. Portions of the pad and subsoil are contaminated and, if stored or disposed of improperly, may represent a potential threat to public health or welfare and the environment. The EE/CA report is the appropriate documentation for the proposed removal action, as identified in guidance from the US Environmental Protection Agency. the objective of the EE/CA report, in addition to identifying the planned removal action, is to document the selection of response activities that will mitigate the potential for release of contaminants from the property into the environment and minimize the related threats to public health or welfare and the environment. 7 refs., 2 figs., 3 tabs

  5. Engineering evaluation/cost analysis for the proposed removal of contaminated materials from pad 1 at the Elza Gate site, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1990-09-01

    This engineering evaluation/cost analysis (EE/CA) has been prepared in support of the proposed removal action for cleanup of radioactively contaminated concrete and soil beneath a building on privately owned commercial property in Oak Ridge, Tennessee. The property, known as the Elza Gate site, became contaminated with uranium-238, radium-226, thorium-232, thorium-230, and decay products as a result of the Manhattan Engineer District storing uranium ore and ore processing residues at the site in the early 1940s. The US Department of Energy (DOE) has responsibility for cleanup of the property under its Formerly Utilized Sites Remedial Action Program (FUSRAP). The DOE plans to remove the cracked and worn concrete pad and contaminated subsoil beneath the pad, after which the property owner/tenant will provide clean backfill and new concrete. Portions of the pad and subsoil are contaminated and, if stored or disposed of improperly, may represent a potential threat to public health or welfare and the environment. The EE/CA report is the appropriate documentation for the proposed removal action, as identified in guidance from the US Environmental Protection Agency. The objective of the EE/CA report, in addition to identifying the planned removal action, is to document the selection of response activities that will mitigate the potential for release of contaminants from the property into the environment and minimize the related threats to public health or welfare and the environment. 7 refs., 2 figs., 3 tabs

  6. Corrective Action Decision Document/Closure Report for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2011-08-01

    Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities were performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that

  7. Formerly utilized MED/AEC sites remedial action program. Removal of a contaminated industrial waste line, Los Alamos, New Mexico. Final report

    International Nuclear Information System (INIS)

    Gunderson, T.C.; Ahlquist, A.J.

    1979-04-01

    In 1977 parts of an abandoned industrial waste line (IWL) that carried laboratory or process chemical and radiochemical wastes were removed from Los Alamos Scientific Laboratory property and from the townsite of Los Alamos in north-central New Mexico. Most of the IWL was removed between 1964 and 1967. Some IWL segments in the townsite, which at that time were buried under newly paved roads, were left for removal during future construction projects involving these roads to minimize traffic problems and road damage, and because they posed no public health hazard. In 1977, prior to impending major road construction in several areas, 400 m (1300 ft) of IWL and two IWL manhole structures were removed from Laboratory and Los Alamos County property. Associated soil contamination was removed to levels considered to be as low as practicable. Contaminated or potentially contaminated material was removed to an approved radioactive waste disposal site on Department of Energy property. Full details of the methods, findings, and as-left conditions are documented in this report

  8. Interplay between FGF21 and insulin action in the liver regulates metabolism

    DEFF Research Database (Denmark)

    Emanuelli, Brice; Vienberg, Sara G; Smyth, Graham

    2014-01-01

    gluconeogenesis in these animals. Improvements in blood sugar were due in part to increased glucose uptake in brown fat, browning of white fat, and overall increased energy expenditure. These effects were preserved even after removal of the main interscapular brown fat pad. In contrast to its retained effects...... of insulin action in the liver by increasing energy metabolism via activation of brown fat and browning of white fat, but intact liver insulin action is required for FGF21 to control hepatic lipid metabolism....

  9. Superfund Record of Decision (EPA Region 9): Nineteenth Avenue Landfill, Phoenix, AZ. (First remedial action), September 1989. Final report

    International Nuclear Information System (INIS)

    1989-01-01

    The 213-acre Nineteenth Avenue Landfill is in an industrial area of Maricopa County, Phoenix, Arizona. State permitted landfill operations were conducted from 1957 to 1979 during which time approximately nine million cubic yards of municipal refuse, solid and liquid industrial wastes, and some medical wastes and materials containing low levels of radioactivity were deposited in the landfill. The State ordered the landfill closed in 1979 due to the periodic inundation of the landfill by flood waters from the Salt River Channel. Subsequently, the city covered the site with fill, stockpiled soil for final capping, installed ground water monitoring wells, built berms around the landfill, and installed a methane gas collection system. The remedial action is designed to mitigate threats resulting from flooding of the landfill, which has occurred intermittently since 1965. The primary contaminants of concern in the soil/refuse include VOCs such as toluene and xylenes

  10. Superfund Record of Decision (EPA region 5): Fultz Landfill, Byesville, OH. (First remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 30-acre Fultz Landfill site is a privately owned inactive sanitary landfill on the north slope of a ridge that overlies abandoned coal mines in Jackson Township, Guernsey County, Ohio. The site lies within the drainage basin of Wills Creek, which flows north adjacent to the site and is used by the city of Cambridge as the municipal water supply. The northern half of the landfill lies in an unreclaimed strip mine where surface mine spoil and natural soil form a shallow aquifer. During the 1970's, the landfill operator was cited for various violations. Investigations in 1988 by EPA indicated that ground water and leachate contaminants emanating from the site have contaminated the shallow aquifer and, to a lesser extent, the deep mine aquifer. The Record of Decision (ROD) addresses all contaminated media, and provides a final remedy for the site. The primary contaminants of concern affecting the soil, sediment, debris, ground water, and surface water are VOCs including benzene, PCE, TCE, toluene, and xylenes; other organics including PAHs and phenols; metals including arsenic, chromium, and lead; and other inorganics. The selected remedial action for this site is included

  11. A scaling study of the step scaling function of quenched QCD with improved gauge actions

    International Nuclear Information System (INIS)

    Takeda, S.; Aoki, S.; Fukugita, M.; Ishikawa, K-I.; Ishizuka, N.; Iwasaki, Y.; Kanaya, K.; Kaneko, T.; Kuramashi, Y.; Okawa, M.; Taniguchi, Y.; Ukawa, A.; Yoshie, T.

    2005-01-01

    We study the scaling behavior of the step scaling function for SU(3) gauge theory, employing the Iwasaki gauge action and the Luescher-Weisz gauge action. In particular, we test the choice of boundary counter terms and apply a perturbative procedure for removal of lattice artifacts for the simulation results in the extrapolation procedure. We confirm the universality of the step scaling functions at both weak and strong coupling regions. We also measure the low energy scale ratio with the Iwasaki action, and confirm its universality

  12. State Actions to Control Fetal Abuse: Ramifications for Child Welfare Practice.

    Science.gov (United States)

    Madden, Robert G.

    1993-01-01

    Reviews recent case law and state statutes for dealing with a pregnant woman's actions which negatively affect her infant. Explains how statutes and case law are applied in civil law to remove a child from the mother at birth and in criminal law to punish a mother while pregnant. (MM)

  13. Superfund record of decision (EPA Region 3): Paoli Rail Yard, Paoli, PA. (First remedial action), July 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 428-acre Paoli Rail Yard site is a maintenance, storage, and repair facility located north of Paoli in Chester County, Pennsylvania. Soil contamination in and around the car shop is attributed to releases of fuel oil and PCB-laden transformer fluid from rail cars during maintenance and repair activities. In 1985, EPA identified PCB contamination in soil and sediment, and on building surfaces. The rail companies agreed to address site clean-up activities, including erosion, sedimentation, and stormwater characteristics and control, decontamination, soil sampling, excavation of 3,500 cubic yards residential soil, and implementation of worker protection measures. The ROD provides a final remedy for contaminated soil (from the rail yard and residences), sediment, and structures at the Paoli Rail Yard, and contaminated ground water. The primary contaminants of concern affecting the soil, sediment, debris, and ground water are VOCs, including benzene, ethylbenzene, toluene, xylenes; and other organics, including PCBs. The selected remedial action for the site are included

  14. Nuclear reactor with makeup water assist from residual heat removal system

    Science.gov (United States)

    Corletti, Michael M.; Schulz, Terry L.

    1993-01-01

    A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit from an in-containment refueling water supply during staged depressurization leading up to passive emergency cooling by gravity feed from the refueling water storage tank, and flooding of the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and prevents flooding of the containment when such action is not necessary. Operation of the passive cooling system is not impaired. A high pressure makeup water storage tank is coupled to the reactor coolant circuit, holding makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal pumps move water from the refueling water storage tank into the coolant circuit as the coolant circuit is depressurized, preventing reaching the final depressurization stage unless the makeup coolant level continues to drop. The residual heat removal system can also be coupled in a loop with the refueling water supply tank, for an auxiliary heat removal path.

  15. Nuclear reactor with makeup water assist from residual heat removal system

    International Nuclear Information System (INIS)

    Corletti, M.M.; Schulz, T.L.

    1993-01-01

    A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit from an in-containment refueling water supply during staged depressurization leading up to passive emergency cooling by gravity feed from the refueling water storage tank, and flooding of the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and prevents flooding of the containment when such action is not necessary. Operation of the passive cooling system is not impaired. A high pressure makeup water storage tank is coupled to the reactor coolant circuit, holding makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal pumps move water from the refueling water storage tank into the coolant circuit as the coolant circuit is depressurized, preventing reaching the final depressurization stage unless the makeup coolant level continues to drop. The residual heat removal system can also be coupled in a loop with the refueling water supply tank, for an auxiliary heat removal path. 2 figures

  16. Nuclear reactor with makeup water assist from residual heat removal system

    Science.gov (United States)

    Corletti, M.M.; Schulz, T.L.

    1993-12-07

    A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit from an in-containment refueling water supply during staged depressurization leading up to passive emergency cooling by gravity feed from the refueling water storage tank, and flooding of the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and prevents flooding of the containment when such action is not necessary. Operation of the passive cooling system is not impaired. A high pressure makeup water storage tank is coupled to the reactor coolant circuit, holding makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal pumps move water from the refueling water storage tank into the coolant circuit as the coolant circuit is depressurized, preventing reaching the final depressurization stage unless the makeup coolant level continues to drop. The residual heat removal system can also be coupled in a loop with the refueling water supply tank, for an auxiliary heat removal path. 2 figures.

  17. Treatability Study of In Situ Technologies for Remediation of Hexavalent Chromium in Groundwater at the Puchack Well Field Superfund Site, New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    Vermeul, Vince R.; Szecsody, Jim E.; Truex, Michael J.; Burns, Carolyn A.; Girvin, Donald C.; Phillips, Jerry L.; Devary, Brooks J.; Fischer, Ashley E.; Li, Shu-Mei W.

    2006-11-13

    This treatability study was conducted by Pacific Northwest National Laboratory (PNNL), at the request of the U. S. Environmental Protection Agency (EPA) Region 2, to evaluate the feasibility of using in situ treatment technologies for chromate reduction and immobilization at the Puchack Well Field Superfund Site in Pennsauken Township, New Jersey. In addition to in situ reductive treatments, which included the evaluation of both abiotic and biotic reduction of Puchack aquifer sediments, natural attenuation mechanisms were evaluated (i.e., chromate adsorption and reduction). Chromate exhibited typical anionic adsorption behavior, with greater adsorption at lower pH, at lower chromate concentration, and at lower concentrations of other competing anions. In particular, sulfate (at 50 mg/L) suppressed chromate adsorption by up to 50%. Chromate adsorption was not influenced by inorganic colloids.

  18. Integrating innovative technology into remedial action at a US Department of Energy facility

    International Nuclear Information System (INIS)

    Diggs, I.W.

    1992-01-01

    The US Atomic Energy Commission (AEC), predecessor to the US Department Energy (DOE), established a production complex in the early 1950's for processing uranium and its compounds from natural uranium ore concentrates for the purpose of producing high purity uranium metal for various uses in defense reactor and nuclear weapons programs. This complex, previously known as the Feed Materials Production Center (FMPC), is now known as the Fernald Environmental Management Project (FEMP). In 1989, production was stopped at the feed materials facility due to a decision by the DOE. In December of 1989, the site was placed on the US EPA's National Priorities List (NPL) of sites requiring environmental cleanup. As a result, in April of 1990 the DOE and the US EPA signed a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Consent Agreement which augmented the FFCA. The DOE recently decided that production at the facility would not be resumed, and therefore, the main scope of work would change to remediation and closure of the site. In response to the FFCA and consistent with the modifications agreed to in the amended Consent Agreement, a Remedial Investigation/Feasibility Study (RI/FS) is in progress pursuant to CERCLA, as amended by the Superfund Amendments and Reauthorization Act (SARA). A RI/FS is a comprehensive environmental investigation systematically conducted according to US EPA regulations and guidelines used to identify and select an action plan for the cleanup of CERCLA sites. The RI phase incorporates a broad-based study to evaluate as completely as possible existing environmental and public health risks associated with past or existing facility operations. The FS phase develops and evaluates corrective action alternatives to mitigate identified environmental concerns

  19. Corrective Action Decision Document/Closure Report for Corrective Action Unit 511: Waste Dumps (Piles and Debris) Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Pastor, Laura

    2005-12-01

    action levels to identify the COCs for each CAS. Assessment of the data generated from investigation activities conducted at CAU 511 revealed the following: (1) Two CASs contained COCs. The extent of the contamination was determined at each site, and the contaminant was removed during the CAI. (2) Debris located at the CASs was removed during the CAI as a best management practice. (3) Materials presenting a potentially explosive hazard at two of the CASs were disposed of appropriately by explosive ordnance disposal/unexploded ordnance personnel. Based on the evaluation of analytical data from the CAI, review of future and current operations at the nine CASs, and the detailed and comparative analysis of the potential corrective action alternatives, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: (1) No further corrective action for CAU 511. (2) No Corrective Action Plan. (3) A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 511. (4) Corrective Action Unit 511 should be moved from Appendix III to Appendix IV of the ''Federal Facility Agreement and Consent Order''.

  20. Neutrophil Leukocyte: Combustive Microbicidal Action and Chemiluminescence

    Directory of Open Access Journals (Sweden)

    Robert C. Allen

    2015-01-01

    Full Text Available Neutrophil leukocytes protect against a varied and complex array of microbes by providing microbicidal action that is simple, potent, and focused. Neutrophils provide such action via redox reactions that change the frontier orbitals of oxygen (O2 facilitating combustion. The spin conservation rules define the symmetry barrier that prevents direct reaction of diradical O2 with nonradical molecules, explaining why combustion is not spontaneous. In burning, the spin barrier is overcome when energy causes homolytic bond cleavage producing radicals capable of reacting with diradical O2 to yield oxygenated radical products that further participate in reactive propagation. Neutrophil mediated combustion is by a different pathway. Changing the spin quantum state of O2 removes the symmetry restriction to reaction. Electronically excited singlet molecular oxygen (O2*1 is a potent electrophilic reactant with a finite lifetime that restricts its radius of reactivity and focuses combustive action on the target microbe. The resulting exergonic dioxygenation reactions produce electronically excited carbonyls that relax by light emission, that is, chemiluminescence. This overview of neutrophil combustive microbicidal action takes the perspectives of spin conservation and bosonic-fermionic frontier orbital considerations. The necessary principles of particle physics and quantum mechanics are developed and integrated into a fundamental explanation of neutrophil microbicidal metabolism.

  1. Untrained chimpanzees (Pan troglodytes schweinfurthii fail to imitate novel actions.

    Directory of Open Access Journals (Sweden)

    Claudio Tennie

    Full Text Available Social learning research in apes has focused on social learning in the technical (problem solving domain - an approach that confounds action and physical information. Successful subjects in such studies may have been able to perform target actions not as a result of imitation learning but because they had learnt some technical aspect, for example, copying the movements of an apparatus (i.e., different forms of emulation learning.Here we present data on action copying by non-enculturated and untrained chimpanzees when physical information is removed from demonstrations. To date, only one such study (on gesture copying in a begging context has been conducted--with negative results. Here we have improved this methodology and have also added non-begging test situations (a possible confound of the earlier study. Both familiar and novel actions were used as targets. Prior to testing, a trained conspecific demonstrator was rewarded for performing target actions in view of observers. All but one of the tested chimpanzees already failed to copy familiar actions. When retested with a novel target action, also the previously successful subject failed to copy--and he did so across several contexts.Chimpanzees do not seem to copy novel actions, and only some ever copy familiar ones. Due to our having tested only non-enculturated and untrained chimpanzees, the performance of our test subjects speak more than most other studies of the general (dis-ability of chimpanzees to copy actions, and especially novel actions.

  2. Untrained Chimpanzees (Pan troglodytes schweinfurthii) Fail to Imitate Novel Actions

    Science.gov (United States)

    Tennie, Claudio; Call, Josep; Tomasello, Michael

    2012-01-01

    Background Social learning research in apes has focused on social learning in the technical (problem solving) domain - an approach that confounds action and physical information. Successful subjects in such studies may have been able to perform target actions not as a result of imitation learning but because they had learnt some technical aspect, for example, copying the movements of an apparatus (i.e., different forms of emulation learning). Methods Here we present data on action copying by non-enculturated and untrained chimpanzees when physical information is removed from demonstrations. To date, only one such study (on gesture copying in a begging context) has been conducted – with negative results. Here we have improved this methodology and have also added non-begging test situations (a possible confound of the earlier study). Both familiar and novel actions were used as targets. Prior to testing, a trained conspecific demonstrator was rewarded for performing target actions in view of observers. All but one of the tested chimpanzees already failed to copy familiar actions. When retested with a novel target action, also the previously successful subject failed to copy – and he did so across several contexts. Conclusion Chimpanzees do not seem to copy novel actions, and only some ever copy familiar ones. Due to our having tested only non-enculturated and untrained chimpanzees, the performance of our test subjects speak more than most other studies of the general (dis-)ability of chimpanzees to copy actions, and especially novel actions. PMID:22905102

  3. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  4. Biota Modeling in EPA's Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

    Energy Technology Data Exchange (ETDEWEB)

    Manning, Karessa L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dolislager, Fredrick G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bellamy, Michael B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-11-01

    The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level tools that set forth Environmental Protection Agency's (EPA) recommended approaches, based upon currently available information with respect to risk assessment, for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has a residential gardening scenario and subsistence farmer exposure scenarios that require modeling of the transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC exposure scenarios. Recent improvements have been made in the biota modeling for these calculators, including newly derived biota intake rates, more comprehensive soil mass loading factors (MLFs), and more comprehensive soil to tissue transfer factors (TFs) for animals and soil to plant transfer factors (BV's). New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

  5. Expedited response action proposal for 316-5 process trenches

    International Nuclear Information System (INIS)

    1991-07-01

    A summary of the evaluation of remedial alternatives for the 300 Area Process Trench sediment removal at Hanford is presented. Based on the preliminary technology screening, screening factors, and selection criteria the preferred alternative for the 300 Area Process Trench is to remove and interim stabilize the sediments within the fenced area of the process trenches. This alternative involves proven technologies that are applied easily at this mixed waste site. This alternative removes and isolates contaminated sediments from the active portion of the trenches allowing continued used of the trenches until an inspection and treatment facility is constructed. The alternative does not incorporate any materials or actions that preclude consideration of a technology for final remediation of the operable unit. The estimated initial and annual costs would enable this alternative to be implemented under the guidelines for an EPA- funded ERA ($2 million). Implementation of the alternative can be accomplished with trained personnel using familiar procedures to provide a safe operation that accomplishes the objective for removing a potential source of contamination, thereby reducing potential environmental threat to groundwater. 18 refs., 5 figs., 9 tabs

  6. Radiochemical Analyses of the Filter Cake, Granular Activated Carbon, and Treated Ground Water from the DTSC Stringfellow Superfund Site Pretreatment Plant

    International Nuclear Information System (INIS)

    Esser, B K; McConachie, W; Fischer, R; Sutton, M; Szechenyi, S

    2005-01-01

    The Department of Toxic Substance Control (DTSC) requested that Lawrence Livermore National Laboratory (LLNL) evaluate the treatment process currently employed at the Department's Stringfellow Superfund Site Pretreatment Plant (PTP) site to determine if wastes originating from the site were properly managed with regards to their radioactivity. In order to evaluate the current management strategy, LLNL suggested that DTSC characterize the effluents from the waste treatment system for radionuclide content. A sampling plan was developed; samples were collected and analyzed for radioactive constituents. Following is brief summary of those results and what implications for waste characterization may be made. (1) The sampling and analysis provides strong evidence that the radionuclides present are Naturally Occurring Radioactive Material (NORM). (2) The greatest source of radioactivity in the samples was naturally occurring uranium. The sample results indicate that the uranium concentration in the filter cake is higher than the Granular Activated Carbon (GAC) samples. (11 -14 and 2-6 ppm respectively). (3) No radiologic background for geologic materials has been established for the Stringfellow site, and comprehensive testing of the process stream has not been conducted. Without site-specific testing of geologic materials and waste process streams, it is not possible to conclude if filter cake and spent GAC samples contain radioactivity concentrated above natural background levels, or if radionuclides are being concentrated by the waste treatment process. Recommendation: The regulation of Technologically Enhanced, Naturally Occurring Radioactive Materials (T-NORM) is complex. Since the results of this study do not conclusively demonstrate that natural radioactive materials have not been concentrated by the treatment process it is recommended that the DTSC consult with the Department of Health Services (DHS) Radiological Health Branch to determine if any further action is

  7. 77 FR 37630 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-06-22

    ... in other nearby soil samples. Surface water within three (3) miles downstream of the Site is used for... Superfund Site and demonstrates how it meets the deletion criteria. II. NPL Deletion Criteria The NCP... of a site from the NPL does not in any way alter EPA's right to take enforcement actions, as...

  8. ARSENIC REMOVAL BY IRON REMOVAL PROCESSES

    Science.gov (United States)

    Presentation will discuss the removal of arsenic from drinking water using iron removal processes that include oxidation/filtration and the manganese greensand processes. Presentation includes results of U.S. EPA field studies conducted in Michigan and Ohio on existing iron remo...

  9. ORD'S ORGANIZATION AND HOW IT IS FUNDED. OVERVIEW OF SCIENTIST-TO-SCIENTIST MINING (TOPICS, OUTCOMES, MAJOR OUTCOMES). FOLLOW-UP ACTION ITEMS.

    Science.gov (United States)

    This discussion was geered to mining experts and discussed mixed ownership sites, ecological risk ssessments, Good Sam Legislation, and lessons learned on Superfund Sites. An overview of ORD was also presented as well as a dicussion on funding, and the purpose of scientist-to-sc...

  10. Residential cancer cluster investigation nearby a Superfund Study Area with trichloroethylene contamination.

    Science.gov (United States)

    Press, David J; McKinley, Meg; Deapen, Dennis; Clarke, Christina A; Gomez, Scarlett Lin

    2016-05-01

    Trichloroethylene (TCE) is an industrial solvent associated with liver cancer, kidney cancer, and non-Hodgkin's lymphoma (NHL). It is unclear whether an excess of TCE-associated cancers have occurred surrounding the Middlefield-Ellis-Whisman Superfund site in Mountain View, California. We conducted a population-based cancer cluster investigation comparing the incidence of NHL, liver, and kidney cancers in the neighborhood of interest to the incidence among residents in the surrounding four-county region. Case counts and address information were obtained using routinely collected data from the Greater Bay Area Cancer Registry, part of the Surveillance, Epidemiology, and End Results program. Population denominators were obtained from the 1990, 2000, and 2010 US censuses. Standardized incidence ratios (SIRs) with two-sided 99 % confidence intervals (CIs) were calculated for time intervals surrounding the US Censuses. There were no statistically significant differences between the neighborhood of interest and the larger region for cancers of the liver or kidney. A statistically significant elevation was observed for NHL during one of the three time periods evaluated (1996-2005: SIR = 1.8, 99 % CI 1.1-2.8). No statistically significant NHL elevation existed in the earlier 1988-1995 (SIR = 1.3, 99 % CI 0.5-2.6) or later 2006-2011 (SIR = 1.3, 99 % CI 0.6-2.4) periods. There is no evidence of an increased incidence of liver or kidney cancer, and there is a lack of evidence of a consistent, sustained, or more recent elevation in NHL occurrence in this neighborhood. This evaluation included existing cancer registry data, which cannot speak to specific exposures incurred by past or current residents of this neighborhood.

  11. Superfund Record of Decision (EPA Region 8): Denver Radium Site Streets, Colorado, March 1986. Final report

    International Nuclear Information System (INIS)

    1986-01-01

    Denver Radium Site Streets is located in Denver, Colorado. The operable unit is comprised of eight street segments in the Cheesman Park area and one segment in the upper downtown area. The nine contaminated street segments are owned by the City and County of Denver and extend approximately 4.5 miles through largely residential areas. The Denver Radium Site Streets contain a 4- to 6-inch layer of radium-contaminated asphalt. The contaminated layer is underlain by compacted gravel road base and is usually overlain by 4 to 12 inches of uncontaminated asphalt pavement. There is an estimated 38,500 cubic yards of contaminated material covering approximately 832,000 square feet. The selected remedial action for the site includes: leaving the contaminated material in place; improving institutional controls; and removing any contaminated material excavated during routine maintenance, repair, or construction activities in the affected streets to a facility approved for storage or disposal of contaminated material

  12. 75 FR 56912 - Live Goats and Swine for Export; Removal of Certain Testing Requirements

    Science.gov (United States)

    2010-09-17

    .... APHIS-2009-0067] RIN 0579-AD18 Live Goats and Swine for Export; Removal of Certain Testing Requirements... tuberculosis and brucellosis testing of goats and breeding swine intended for export to countries that do not require such tests. This action would facilitate the exportation of goats and breeding swine by...

  13. Combination of selected enzymes with cetyltrimethylammonium bromide in biofilm inactivation, removal and regrowth

    KAUST Repository

    Araujo, Paula Alexandra Da Silva; Machado, Idalina; Meireles, Ana; Leiknes, TorOve; Mergulhã o, Filipe; Melo, Luí s F.; Simõ es, Manuel

    2017-01-01

    Enzymes are considered an innovative and environmentally friendly approach for biofilm control due to their lytic and dispersal activities. In this study, four enzymes (β-glucanase, α-amylase, lipase and protease) were tested separately and in combination with the quaternary ammonium compound cetyltrimethylammonium bromide (CTAB) to control flow-generated biofilms of Pseudomonas fluorescens. The four enzymes caused modest reduction of biofilm colony forming units (CFU). Protease, β-glucanase and α-amylase also caused modest biofilm removal. CTAB combined with either β-glucanase or α-amylase increased biofilm removal. Its combination with either β-glucanase or protease increased CFU reduction. However, CTAB−protease combination was antagonist in biofilm removal. Long-term effects in biofilm mass reduction were observed after protease exposure. In contrast, biofilms treated with β-glucanase were able to regrowth significantly after exposure. Moreover, short-term respirometry tests with planktonic cells were performed to understand the effects of enzymes and their combination with CTAB on P. fluorescens viability. Protease and lipase demonstrated antimicrobial action, while α-amylase increased bacterial metabolic activity. The combination of CTAB with either protease or α-amylase was antagonistic, decreasing the antimicrobial action of CTAB. The overall results demonstrate a modest effect of the selected enzymes in biofilm control, either when applied alone or each one in combination with CTAB. Total biofilm removal or CFU reduction was not achieved and, in some cases, the use of enzymes antagonized the effects of CTAB. The results also propose that complementary tests, to characterize biofilm integrity and microbial viability, are required when someone is trying to assess the role of novel biocide - enzyme mixtures for effective biofilm control.

  14. Combination of selected enzymes with cetyltrimethylammonium bromide in biofilm inactivation, removal and regrowth

    KAUST Repository

    Araujo, Paula Alexandra Da Silva

    2017-03-01

    Enzymes are considered an innovative and environmentally friendly approach for biofilm control due to their lytic and dispersal activities. In this study, four enzymes (β-glucanase, α-amylase, lipase and protease) were tested separately and in combination with the quaternary ammonium compound cetyltrimethylammonium bromide (CTAB) to control flow-generated biofilms of Pseudomonas fluorescens. The four enzymes caused modest reduction of biofilm colony forming units (CFU). Protease, β-glucanase and α-amylase also caused modest biofilm removal. CTAB combined with either β-glucanase or α-amylase increased biofilm removal. Its combination with either β-glucanase or protease increased CFU reduction. However, CTAB−protease combination was antagonist in biofilm removal. Long-term effects in biofilm mass reduction were observed after protease exposure. In contrast, biofilms treated with β-glucanase were able to regrowth significantly after exposure. Moreover, short-term respirometry tests with planktonic cells were performed to understand the effects of enzymes and their combination with CTAB on P. fluorescens viability. Protease and lipase demonstrated antimicrobial action, while α-amylase increased bacterial metabolic activity. The combination of CTAB with either protease or α-amylase was antagonistic, decreasing the antimicrobial action of CTAB. The overall results demonstrate a modest effect of the selected enzymes in biofilm control, either when applied alone or each one in combination with CTAB. Total biofilm removal or CFU reduction was not achieved and, in some cases, the use of enzymes antagonized the effects of CTAB. The results also propose that complementary tests, to characterize biofilm integrity and microbial viability, are required when someone is trying to assess the role of novel biocide - enzyme mixtures for effective biofilm control.

  15. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ''may affect'' the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA)

  16. Micropollutants removal and health risk reduction in a water reclamation and ecological reuse system.

    Science.gov (United States)

    Ma, Xiaoyan Y; Li, Qiyuan; Wang, Xiaochang C; Wang, Yongkun; Wang, Donghong; Ngo, Huu Hao

    2018-07-01

    As reclaimed water use is increasing, its safety attracts growing attention, particularly with respect to the health risks associated with the wide range of micropollutants found in the reclaimed water. In this study, sophisticated analysis was conducted for water samples from a water reclamation and ecological reuse system where domestic wastewater was treated using an anaerobic-anoxic-oxic unit followed by a membrane bioreactor (A 2 O-MBR), and the reclaimed water was used for replenishing a landscape lake. A total of 58 organic micropollutants were detected in the system, consisting of 13 polycyclic aromatic hydrocarbons (PAHs), 16 phenols, 3 pesticides, and 26 pharmaceuticals and personal care products (PPCPs). After treatment by the A 2 O-MBR process, effective removal of pesticides and phenols was achieved, while when the reclaimed water entered the landscape lake, PPCPs were further removed. From the physicochemical properties of micropollutants, it could be inferred that phenols and dichlorphos (the only pesticide with considerable concentration in the influent) would have been mainly removed by biodegradation and/or volatilization in the biological treatment process. Additionally, it is probable that sludge adsorption also contributed to the removal of dichlorphos. For the predominant PPCP removal in the landscape lake, various actions, such as adsorption, biodegradation, photolysis, and ecologically mediated processes (via aquatic plants and animals), would have played significant roles. However, according to their logK oc , logK ow and logD (pH = 8) values, it could be concluded that adsorption by suspended solids might be an important action. Although carcinogenic and non-carcinogenic risks associated with all the detected micropollutants were at negligible levels, the hazard quotients (HQs) of PPCPs accounted for 92.03%-97.23% of the HQ Total . With the significant removal of PPCPs through the ecological processes in the landscape lake, the safety

  17. Using a Spectral Method to Evaluate Hyporheic Exchange and its Effect on Reach Scale Nitrate Removal.

    Science.gov (United States)

    Moren, I.; Worman, A. L. E.; Riml, J.

    2017-12-01

    Previous studies have shown that hyporheic exchange processes can be of great importance for the transport, retention and mass removal of nutrients in streams. Specifically, the flow of surface water through the hyporheic zone enhances redox-sensitive reactions such as coupled nitrification-denitrification. This self-cleaning capacity of streams can be utilized in stream restoration projects aiming to improve water quality by reconstructing the geomorphology of the streams. To optimize the effect of restoration actions we need quantitative understanding of the linkage between stream geomorphology, hyporheic exchange processes and the desired water quality targets. Here we propose an analytical, spectral methodology to evaluate how different stream geomorphologies induce hyporheic exchange on a wide range of spatial and temporal scales. Measurements of streambed topographies and surface water profiles from agricultural streams were used to calculate the average hyporheic exchange velocity and residence times and the result was compared with in-stream tracer test. Furthermore, the hyporheic exchange induced by steps in the surface water profile was derived as a comparison of the theoretical capacity of the system. Based on differences in hyporheic exchange, the mass removal of nitrate could be derived for the different geomorphologies. The maximum nitrate mass removal was found to be related to a specific Damkhöler number, which reflects that the mass removal can be either reaction or transport controlled. Therefore, although hyporheic exchange induced by steps in the surface water profile was generally larger than the hyporheic exchange in the observed natural reaches, this would not necessarily lead a larger nitrate mass removal provided that the hyporheic residence times are not long enough to facilitate denitrification processes. The study illustrates the importance to investigate a stream thoroughly before any remediation actions are implemented, specifically

  18. Geophysical log analysis of selected test and residential wells at the Shenandoah Road National Superfund Site, East Fishkill, Dutchess County, New York

    Science.gov (United States)

    Reynolds, Richard J.; Anderson, J. Alton; Williams, John H.

    2015-01-01

    The U.S. Geological Survey collected and analyzed geophysical logs from 20 test wells and 23 residential wells at the Shenandoah Road National Superfund Site in East Fishkill, New York, from 2006 through 2010 as part of an Interagency Agreement to provide hydrogeologic technical support to the U.S. Environmental Protection Agency, Region 2. The geophysical logs collected include caliper, gamma, acoustic and optical televiewer, deviation, electromagnetic-induction, magnetic-susceptibility, fluid-property, and flow under ambient and pumped conditions. The geophysical logs were analyzed along with single-well aquifer test data and drilling logs to characterize the lithology, fabric, fractures, and flow zones penetrated by the wells. The results of the geophysical log analysis were used as part of the hydrogeologic characterization of the site and in the design of discrete-zone monitoring installations in the test wells and selected residential wells.

  19. Hair Removal

    Science.gov (United States)

    ... Staying Safe Videos for Educators Search English Español Hair Removal KidsHealth / For Teens / Hair Removal What's in ... you need any of them? Different Types of Hair Before removing hair, it helps to know about ...

  20. 75 FR 29217 - Office of the Attorney General; Certification Process for State Capital Counsel Systems; Removal...

    Science.gov (United States)

    2010-05-25

    ... Office of the Attorney General; Certification Process for State Capital Counsel Systems; Removal of Final Rule AGENCY: Office of the Attorney General, Department of Justice. ACTION: Notice of proposed... the Attorney General has certified ``that [the] State has established a mechanism for providing...

  1. Challenges, actions and actors in the transition towards a widespread hydrogen energy supply

    NARCIS (Netherlands)

    Mourik, R.M.; Jeeninga, H.; Groot, de Arend; Pierucci, S.

    2004-01-01

    The Hysociety project, financed under the FP5 framework of the European commission, aims to contribute to European policies on hydrogen related issues through the development of an Action Plan for the introduction of hydrogen and for the removal and/or reduction of challenges. The geographic target

  2. Corrective Action Decision Document for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada, Revision 1 with ROTC 1

    International Nuclear Information System (INIS)

    Boehlecke, Robert

    2004-01-01

    -35-01, 05-99-04, and 22-99-04. Based on the evaluation of analytical data from the corrective action investigation; review of future and current operations in Areas 5, 22, and 23 of the NTS; and the detailed comparative analysis of the potential corrective action alternatives, the following corrective actions were recommended for the CAU 140 CASs. No Further Action is the preferred corrective action for CASs 05-08-02, 05-17-01, 05-19-01, 05-35-01, 05-99-04, and 22-99-04. Clean Closure is the preferred corrective action for the following CAS: CAS 05-08-01 - Remove metal edging and COC-impacted soil around location A05. Alternative 3, Closure-in-Place, is the preferred corrective action for the following sites: CAS 05-23-01 - Gravel Gertie; and CAS 23-17-01 - Hazardous Waste Storage Area. The preferred corrective action alternatives were evaluated on technical merit focusing on performance, reliability, feasibility, and safety. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable state and federal regulations for closure of the sites and will eliminate potential future exposure pathways to the contaminated media at CAU 140. In addition to the closure activities outlined above, the surface debris at CASs 05-08-01, 05-08-02, 05-17-01, 05-19-01, and 05-99-04 will be removed and disposed as a best management practice during closure activities

  3. Delineation of areas having elevated electrical conductivity, orientation and characterization of bedrock fractures, and occurrence of groundwater discharge to surface water at the U.S. Environmental Protection Agency Barite Hill/Nevada Goldfields Superfund site near McCormick, South Carolina

    Science.gov (United States)

    Chapman, Melinda J.; Huffman, Brad A.; McSwain, Kristen Bukowski

    2015-07-16

    During October 2012 through March 2013, the U.S. Geological Survey (USGS), in cooperation with the U.S. Environmental Protection Agency (EPA) Region 4, Superfund Section, conducted borehole geophysical logging, surface geophysical surveys, and water-quality profiling in selected wells and areas to characterize or delineate the extent of elevated subsurface electrical conductivity at the EPA Barite Hill/Nevada Goldfields Superfund site near McCormick, South Carolina. Elevated electrical conductivity measured at the site may be related to native rock materials, waste rock disposal areas used in past operations, and (or) groundwater having elevated dissolved solids (primarily metals and major ions) related to waste migration. Five shallow screened wells and four open-borehole bedrock wells were logged by using a suite of borehole tools, and downhole water-quality profiles were recorded in two additional wells. Well depths ranged from about 26 to 300 feet below land surface. Surface geophysical surveys based on frequency-domain electromagnetic and distributed temperature sensing (DTS) techniques were used to identify areas of elevated electrical conductivity (Earth materials and groundwater) and potential high dissolved solids in groundwater and surface water on land and in areas along the northern unnamed tributary at the site.

  4. Corrective Action Decision Document for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    International Nuclear Information System (INIS)

    1999-01-01

    This Corrective Action Decision Document (CADD) identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 417: Central Nevada Test Area Surface, Nevada, under the Federal Facility Agreement and Consent Order. Located in Hot Creek Valley in Nye County, Nevada, and consisting of three separate land withdrawal areas (UC-1, UC-3, and UC-4), CAU 417 is comprised of 34 corrective action sites (CASs) including 2 underground storage tanks, 5 septic systems, 8 shaker pad/cuttings disposal areas, 1 decontamination facility pit, 1 burn area, 1 scrap/trash dump, 1 outlier area, 8 housekeeping sites, and 16 mud pits. Four field events were conducted between September 1996 and June 1998 to complete a corrective action investigation indicating that the only contaminant of concern was total petroleum hydrocarbon (TPH) which was found in 18 of the CASs. A total of 1,028 samples were analyzed. During this investigation, a statistical approach was used to determine which depth intervals or layers inside individual mud pits and shaker pad areas were above the State action levels for the TPH. Other related field sampling activities (i.e., expedited site characterization methods, surface geophysical surveys, direct-push geophysical surveys, direct-push soil sampling, and rotosonic drilling located septic leachfields) were conducted in this four-phase investigation; however, no further contaminants of concern (COCs) were identified. During and after the investigation activities, several of the sites which had surface debris but no COCs were cleaned up as housekeeping sites, two septic tanks were closed in place, and two underground storage tanks were removed. The focus of this CADD was to identify CAAs which would promote the prevention or mitigation of human exposure to surface and subsurface soils with contaminant

  5. Superfund Record of Decision (EPA Region 6): United Nuclear Corporation, Mckinley County, New Mexico, ground-water operable unit (first remedial action) September 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The United Nuclear Corporation (UNC) site is located approximately 17 miles northeast of Gallup, New Mexico in McKinley County. The site operated as a State-licensed uranium mill facility from June 1977 to May 1982. It includes an ore-processing mill (about 25 acres) and an unlined tailings pond area (about 100 acres). In July 1979, approximately 23 million gallons of tailings and pond water were released to a nearby river as a result of a dam breach in the tailings pond area. The site damage was repaired; however, attention was focused on ground-water contamination resulting from tailings seepage. Nevertheless, the offsite migration of radionuclides and chemical constituents from uranium milling byproduct materials into the ground water, as well as to surface water and air, are still principal threats at the site. The remedial action will address onsite ground water contamination. Source control and onsite surface reclamation will be implemented under the direction of the Nuclear Regulatory Commission and integrated with this ground water operable unit. The primary contaminants of concern affecting the ground water are metals including arsenic, and radioactive substances including radium-226/228 and gross alpha. The selected remedial action for the site is included

  6. 76 FR 29991 - Live Goats and Swine for Export; Removal of Certain Testing Requirements

    Science.gov (United States)

    2011-05-24

    ...-0067] RIN 0579-AD18 Live Goats and Swine for Export; Removal of Certain Testing Requirements AGENCY... testing of goats and breeding swine intended for export to countries that do not require such tests. This action will facilitate the exportation of goats and breeding swine by eliminating the need to conduct pre...

  7. Removal site evaluation report on the bulk shielding facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This removal site evaluation report on the Bulk Shielding Facility (BSF) at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around BSF buildings pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and whether remedial site evaluations or removal actions are, therefore, required. A removal site evaluation was conducted at nine areas associated with the BSF. The scope of each evaluation included (1) a search for, and review of, readily available historical records regarding operations and use of the facility (including hazardous substance usage and existing contamination); (2) interviews with facility personnel concerning current and past practices; and (3) a brief walk-through to visually inspect the facility and identify existing hazard areas requiring maintenance actions or remedial evaluation. The results of the removal site evaluation indicate that no substantial risks exist from contaminants present because adequate efforts are being made to contain and control existing contamination and hazardous substances and to protect human health and the environment. At Building 3004, deteriorated and peeling exterior paint has a direct pathway to the storm water drainage system and can potentially impact local surface water during periods of storm water runoff. The paint is assumed to be lead based, thus posing a potential problem. The paint should be sampled and analyzed to determine its lead content and to assess whether a hazard exists. If so, a maintenance action will be necessary to prevent further deterioration and dislodging of the paint. In addition, if the paint contains lead, then a remedial site evaluation should be conducted to determine whether lead from fallen chips has impacted soils in the immediate area of the building

  8. Controls of nitrite oxidation in ammonia-removing biological air filters

    DEFF Research Database (Denmark)

    Juhler, Susanne; Ottosen, Lars Ditlev Mørck; Nielsen, Lars Peter

    2008-01-01

    in accumulation of nitrate rather than nitrite and a significant decline in pH. As a consequence, ammonia is removed more efficiently, but heterotrophic oxidation of odorous compounds might be inhibited.  To identify the controlling mechanisms of nitrite oxidation, full-scale biological air filters were...... activity resulting in a lowered pH and thus a decreased FA concentration, promoting further growth of NOB. Yet, in some cases a situation with a nitrate-to-nitrite ratio of 1 and moderate pH remained stable even under varying air load and water supply, suggesting that additional mechanisms were involved......In biological air filters ammonia is removed due to the action of Ammonia Oxidizing Bacteria (AOB) resulting in nitrite accumulation exceeding 100 mM. Among filters treating exhaust air from pig facilities successful establishment of Nitrite Oxidizing Bacteria (NOB) sometimes occurs, resulting...

  9. Treatment methods and comparative risks of thorium removal from waste residues

    International Nuclear Information System (INIS)

    Porter, R.D.; Hamby, D.M.; Martin, J.E.

    1997-07-01

    This study was done to examine the risks of remediation and the effectiveness of removal methods for thorium and its associated radioactive decay products from various soils and wastes associated with DOE's Formerly Utilized Sites Remedial Action Program (FUSRAP). Removal of 230 Th from uranium process residues would significantly reduce the buildup of 226 Ra (half-life of 1600 years), and since 230 Th concentrations at most of the important sites greatly exceed the 226 Ra concentrations, such removal would reduce the accumulation of additional radiation risks associated with 226 Ra and its products; and, if treatment also removed 226 Ra, these risks could be mitigated even further. Removal of 232 Th from thorium process residues would remove the source material for 228 Ra, and since 228 Ra has a half-life of 5.76 years, its control at FUSRAP sites could be done with land use controls for the 30--50 years required for 228 Ra and the risks associated with its decay products to decay away. It must be recognized, however, that treatment methods invariably require workers to process residues and waste materials usually with bulk handling techniques. These processes expose workers to the radioactivity in the materials, therefore, workers would incur radiological risks in addition to industrial accident risks. An important question is whether the potential reduction of future radiological risks to members of the public justifies the risks that are incurred by remediation workers due to handling materials. This study examines, first, the effectiveness of treatment and then the risks that would be associated with remediation

  10. Superfund Record of Decision (EPA Region 2): Sinclair Refinery, Allegany County, Wellsville, NY. (Second remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The Sinclair Refinery site is a former refinery in Wellsville, Allegany County, New York. The site is composed of a 90-acre refinery area, 10-acre landfill area, and 14-acre offsite tank farm. From 1901 to 1958, the site was used to process Pennsylvania grade crude oil until a fire in 1958 halted operations. Currently, some private companies and the State University of New York occupy the site. A 1981 site inspection revealed that debris from the eroding landfill area has washed into and contaminated the Genesee River. The ROD addresses OU2, remediation of the remaining contaminated areas at the site located within the 90-acre refinery area and the offsite tank farm including the contaminated ground water beneath the refinery. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene and xylenes, semi-volatile compounds including naphthalene and nitrobenzene, and metals including arsenic and lead. The selected remedial action for the site is included

  11. Superfund Record of Decision (EPA Region 8): Denver Radium/Card Corporation Property, Colorado (third remedial action), June 1987. Final report

    International Nuclear Information System (INIS)

    1987-01-01

    The Denver Radium/Card Corporation property is a 17.2-acre site located in Denver, Colorado. In 1979, the EPA discovered a reference to the National Radium Institute in 1916 U.S. Bureau of Mines report. Subsequent field research revealed the presence of thirty-one radioactive sites in the Denver Metropolitan area, one of these being Card property, the location of the original Pittsburgh Radium Company processing facility. The site consists of five buildings and an oil and waste water pond at the eastern boundary. There is no serious public health risk at present from radium or its decay products, most notable radion gas. However, there is the potential for increased public health risk if the radium contaminated materials are misused or inadvertently spread. Currently, radium has been detected in the soil, sediment, and underneath the True Truss building. EPA's preferred remedial action for the Card property is permanent offsite disposal. However, the alternative can not be implemented until a suitable offsite facility is designated

  12. Spectral and temporal cues for perception of material and action categories in impacted sound sources

    DEFF Research Database (Denmark)

    Hjortkjær, Jens; McAdams, Stephen

    2016-01-01

    In two experiments, similarity ratings and categorization performance with recorded impact sounds representing three material categories (wood, metal, glass) being manipulated by three different categories of action (drop, strike, rattle) were examined. Previous research focusing on single impact...... correlated with the pattern of confusion in categorization judgments. Listeners tended to confuse materials with similar spectral centroids, and actions with similar temporal centroids and onset densities. To confirm the influence of these different features, spectral cues were removed by applying...

  13. A Discussion of the Issue of Football Helmet Removal in Suspected Cervical Spine Injuries

    Science.gov (United States)

    Segan, Ross D.; Cassidy, Christine; Bentkowski, Jamie

    1993-01-01

    In some areas, it is a commonly accepted emergency medical technician protocol to remove a helmet during the initial management of suspected cervical spine injures. After a comprehensive survey of relevant literature, four primary reasons why Emergency Medical Services professionals would desire to remove a helmet emerge. Sources suggest that the presence of a helmet might: 1) interfere with immobilization of the athlete; 2) interfere with the ability to visualize injuries; 3) cause hyperflexion of the cervical spine; and 4) prevent proper airway management during a cardiorespiratory emergency. Many available protocols are designed for the removal of closed chamber motorcycle helmets that do not have removable face masks. There are a great number of differing viewpoints regarding this issue. The varying viewpoints are results of the failure of many emergency medical technician management protocols to address the unique situation presented by a football helmet. We: 1) demonstrate that football helmet removal is potentially dangerous and unnecessary, 2) suggest that cardiorespiratory emergencies can be effectively managed without removing the helmet, and 3) provide sports medicine professional with information that may be used to establish a joint Emergency Medical Services/Sports Medicine emergency action plan. ImagesFig. 1.Fig 2.Fig 3.Fig 4.Fig 5.Fig 6. PMID:16558244

  14. Federal Employees Health Benefits Program: Removal of Eligible and Ineligible Individuals From Existing Enrollments. Final rule.

    Science.gov (United States)

    2018-01-23

    The United States Office of Personnel Management (OPM) is issuing a final rule amending Federal Employees Health Benefits (FEHB) Program regulations to provide a process for removal of certain identified individuals who are found not to be eligible as family members from FEHB enrollments. This process would apply to individuals for whom there is a failure to provide adequate documentation of eligibility when requested. This action also amends Federal Employees Health Benefits (FEHB) Program regulations to allow certain eligible family members to be removed from existing self and family or self plus one enrollments.

  15. Development Of Chemical Reduction And Air Stripping Processes To Remove Mercury From Wastewater

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Dennis G.; Looney, Brian B.; Craig, Robert R.; Thompson, Martha C.; Kmetz, Thomas F.

    2013-07-10

    This study evaluates the removal of mercury from wastewater using chemical reduction and air stripping using a full-scale treatment system at the Savannah River Site. The existing water treatment system utilizes air stripping as the unit operation to remove organic compounds from groundwater that also contains mercury (C ~ 250 ng/L). The baseline air stripping process was ineffective in removing mercury and the water exceeded a proposed limit of 51 ng/L. To test an enhancement to the existing treatment modality a continuous dose of reducing agent was injected for 6-hours at the inlet of the air stripper. This action resulted in the chemical reduction of mercury to Hg(0), a species that is removable with the existing unit operation. During the injection period a 94% decrease in concentration was observed and the effluent satisfied proposed limits. The process was optimized over a 2-day period by sequentially evaluating dose rates ranging from 0.64X to 297X stoichiometry. A minimum dose of 16X stoichiometry was necessary to initiate the reduction reaction that facilitated the mercury removal. Competing electron acceptors likely inhibited the reaction at the lower 1 doses, which prevented removal by air stripping. These results indicate that chemical reduction coupled with air stripping can effectively treat large-volumes of water to emerging part per trillion regulatory standards for mercury.

  16. Project management plan for Waste Area Grouping 5 Old Hydrofracture Facility tanks contents removal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-02-01

    This revision (Rev. 1) updates the schedule and designation of responsibilities for the Old Hydrofracture Facility (OHF) tanks contents removal project. Ongoing and planned future activities include: cold testing of the sluicing and pumping system; readiness assessment; equipment relocation and assembly; isotopic dilution of fissile radionuclides; sluicing and transfer of the tanks contents; and preparation of the Removal Action Completion Report. The most significant change is that the sluicing and pumping system has been configured by and will be operated by CDM Federal Programs Corporation. In addition, a new technical lead and a new project analyst have been designated within Lockheed Martin Energy Systems, Inc. and Lockheed Martin Energy Research Corp. The schedule for tanks contents removal has been accelerated, with transfer of the final batch of tank slurry now scheduled for March 31, 1998 (instead of November 10, 1998). The OHF sluicing and pumping project is proceeding as a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act. The purpose of the project is to remove the contents from five inactive underground storage tanks, designated T-1, T-2, T-3, T-4, and T-9. The tanks contain an estimated 52,700 gal of liquid and sludge, together comprising a radioactive inventory of approximately 30,000 Ci

  17. Effect and Removal Mechanisms of 6 Different Washing Agents for Building Wastes Containing Chromium

    Directory of Open Access Journals (Sweden)

    Wang Xing-run

    2012-01-01

    Full Text Available With the building wastes contaminated by chromium in Haibei Chemical Plan in China as objects, we studied the contents of total Cr and Cr (VI of different sizes, analyzed the effect of 6 different washing agents, discussed the removal mechanisms of 6 different washing agents for Cr in various forms, and finally selected applicable washing agent. As per the results, particle size had little impact on the contents of total Cr and Cr (VI; after one washing with water, the removal rate of total Cr and Cr (VI was 75% and 78%, respectively, and after the second washing with 6 agents, the removal rate of citric acid was the highest, above 90% for total Cr and above 99% for hexavalent chromium; the pH of building wastes were reduced by citric acid, and under acid condition, hexavalent chromium was reduced to trivalent chromium spontaneously by organic acid, which led to better removal rate of acid soluble Cr and reducible Cr; due to the complexing action, citric acid had best removal rate for oxidizable trivalent chromium. In conclusion, citric acid is the most applicable second washing agent for building wastes.

  18. Savings for visuomotor adaptation require prior history of error, not prior repetition of successful actions.

    Science.gov (United States)

    Leow, Li-Ann; de Rugy, Aymar; Marinovic, Welber; Riek, Stephan; Carroll, Timothy J

    2016-10-01

    When we move, perturbations to our body or the environment can elicit discrepancies between predicted and actual outcomes. We readily adapt movements to compensate for such discrepancies, and the retention of this learning is evident as savings, or faster readaptation to a previously encountered perturbation. The mechanistic processes contributing to savings, or even the necessary conditions for savings, are not fully understood. One theory suggests that savings requires increased sensitivity to previously experienced errors: when perturbations evoke a sequence of correlated errors, we increase our sensitivity to the errors experienced, which subsequently improves error correction (Herzfeld et al. 2014). An alternative theory suggests that a memory of actions is necessary for savings: when an action becomes associated with successful target acquisition through repetition, that action is more rapidly retrieved at subsequent learning (Huang et al. 2011). In the present study, to better understand the necessary conditions for savings, we tested how savings is affected by prior experience of similar errors and prior repetition of the action required to eliminate errors using a factorial design. Prior experience of errors induced by a visuomotor rotation in the savings block was either prevented at initial learning by gradually removing an oppositely signed perturbation or enforced by abruptly removing the perturbation. Prior repetition of the action required to eliminate errors in the savings block was either deprived or enforced by manipulating target location in preceding trials. The data suggest that prior experience of errors is both necessary and sufficient for savings, whereas prior repetition of a successful action is neither necessary nor sufficient for savings. Copyright © 2016 the American Physiological Society.

  19. Neuron network training system for Robot responding intelligently to input light stimuli (notice of removal)

    Science.gov (United States)

    Xiao, Baoping; Xu, Chang; Xu, Lijun; Luo, Qinhua

    2007-11-01

    This paper (672414) was removed from the SPIE Digital Library on 13 April 2010 to discovery of plagiarism. As stated in the SPIE Guidelines for Professional Conduct and Publishing Ethics, SPIE defines plagiarism as the reuse of someone else's prior ideas, processes, results, or words without explicit attribution of the original author and source, or falsely representing someone else's work as one's own. SPIE considers plagiarism in any form, at any level, to be unacceptable and a serious breach of professional conduct. It is SPIE policy to remove such papers and to take appropriate corrective or disciplinary action against the offending author(s).

  20. The heat engine cycle, the heat removal cycle, and ergonomics of the control room displays

    International Nuclear Information System (INIS)

    Beltracchi, L.

    1986-01-01

    This paper discusses and illustrates the ergonomics of an integrated display, which will allow operators to monitor the heat engine cycle during normal operation of the plant, and the heat removal cycle during emergency operation of the plant. A computer-based iconic display is discussed as an overview to monitor these cycles. Specific emphasis is placed upon the process variables and process functions within each cycle, and the action of control systems and engineered safeguard systems within each cycle. This paper contains examples of display formats for the heat engine cycle and the heat removal cycle in a pressurized water reactor

  1. Closure Report for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-09-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location • Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are

  2. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado: Remedial action selection report

    International Nuclear Information System (INIS)

    1992-10-01

    The Gunnison uranium mill tailings site is just south of the city limits of Gunnison, Colorado, in the south-central part of the state. The entire site covers 61 acres in the valley of the Gunnison River and Tomichi Creek. Contaminated materials at the Gunnison processing site include the tailings pile, covering about 35 acres to an average depth of nine feet and containing 459,000 cubic yards. Ore storage areas and the former mill processing area cover about 20 acres on the south side of the site. The volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 718,900 cubic yards. An interim action was approved by the US Department of Energy to eliminate existing safety hazards to the Gunnison community. These actions, started in September 1991, included demolition of mill buildings and related processing facilities, excavation of two underground storage tanks, removal of asbestos and other hazardous materials from buildings, storage of those materials in a secured area on the site, and improvements of site security

  3. Phosphorus and Cu2+ removal by periphytic biofilm stimulated by upconversion phosphors doped with Pr3+-Li.

    Science.gov (United States)

    Zhu, Yan; Zhang, Jianhong; Zhu, Ningyuan; Tang, Jun; Liu, Junzhuo; Sun, Pengfei; Wu, Yonghong; Wong, Po Keung

    2018-01-01

    Upconversion phosphors (UCPs) can convert visible light into luminescence, such as UV, which can regulate the growth of microbes. Based on these fundamentals, the community composition of periphytic biofilms stimulated by UCPs doped with Pr 3+ -Li + was proposed to augment the removal of phosphorus (P) and copper (Cu). Results showed that the biofilms with community composition optimized by UCPs doped with Pr 3+ -Li + had high P and Cu 2+ removal rates. This was partly due to overall bacterial and algal abundance and biomass increases. The synergistic actions of algal, bacterial biomass and carbon metabolic capacity in the Pr-Li stimulated biofilms facilitated the removal of P and Cu 2+ . The results show that the stimulation of periphytic biofilms by lanthanide-doped UCPs is a promising approach for augmenting P and Cu 2+ removal. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Corrective Action Decision Document for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada Appendix D - Corrective Action Investigation Report, Central Nevada Test Area, CAU 417

    International Nuclear Information System (INIS)

    1999-01-01

    This Corrective Action Decision Document (CADD) identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 417: Central Nevada Test Area Surface, Nevada, under the Federal Facility Agreement and Consent Order. Located in Hot Creek Valley in Nye County, Nevada, and consisting of three separate land withdrawal areas (UC-1, UC-3, and UC-4), CAU 417 is comprised of 34 corrective action sites (CASs) including 2 underground storage tanks, 5 septic systems, 8 shaker pad/cuttings disposal areas, 1 decontamination facility pit, 1 burn area, 1 scrap/trash dump, 1 outlier area, 8 housekeeping sites, and 16 mud pits. Four field events were conducted between September 1996 and June 1998 to complete a corrective action investigation indicating that the only contaminant of concern was total petroleum hydrocarbon (TPH) which was found in 18 of the CASs. A total of 1,028 samples were analyzed. During this investigation, a statistical approach was used to determine which depth intervals or layers inside individual mud pits and shaker pad areas were above the State action levels for the TPH. Other related field sampling activities (i.e., expedited site characterization methods, surface geophysical surveys, direct-push geophysical surveys, direct-push soil sampling, and rotosonic drilling located septic leachfields) were conducted in this four-phase investigation; however, no further contaminants of concern (COCs) were identified. During and after the investigation activities, several of the sites which had surface debris but no COCs were cleaned up as housekeeping sites, two septic tanks were closed in place, and two underground storage tanks were removed. The focus of this CADD was to identify CAAs which would promote the prevention or mitigation of human exposure to surface and subsurface soils with contaminant

  5. Analysis of removal of cadmium by action of immobilized Chlorella sp. micro-algae in alginate beads [version 1; referees: 2 approved

    Directory of Open Access Journals (Sweden)

    Christian Valdez

    2018-01-01

    Full Text Available Cadmium (Cd is a metal that can negatively interfere with the metabolic systems of living beings. The objective of this work was to evaluate the capacity for cadmium removal in aqueous solutions by immobilized Chlorella sp. in calcium alginate beads. Beads without Chlorella sp. were used as a control. All the treatments were established in triplicate for 80 min, at four concentrations of cadmium (0, 20, 100 and 200 ppm, taking samples of aqueous solution every 10 min, to be read using atomic absorption equipment. The study determined that the treatment of alginate beads with immobilized Chlorella sp. removed 59.67% of cadmium at an initial concentration of 20 ppm, this being the best removal result.

  6. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): (sm b ullet) CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536 Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure

  7. Dynamic operator actions analysis for inherently safe fast reactors and light water reactors

    International Nuclear Information System (INIS)

    Ho, V.; Apostolakis, G.

    1988-01-01

    A comparative dynamic human actions analysis of inherently safe fast reactors (ISFRs) and light water reactors (LWRs) in terms of systems response and estimated human error rates is presented. Brief overviews of the ISFR and LWR systems are given to illustrate the design differences. Key operator actions required by the ISFR reactor shutdown and decay heat removal systems are identified and are compared with those of the LWR. It is observed that, because of the passive nature of the ISFR safety-related systems, a large time window is available for operator actions during transient events. Furthermore, these actions are fewer in number, are less complex, and have lower error rates and less severe consequences than those of the LWRs. We expect the ISFR operator errors' contribution to risk is smaller (at least in the context of the existing human reliability models) than that of the LWRs. (author)

  8. Basement of Structure, Main Power and Design Parameters of Mechanism of Removing Sections of Mechanized Sets of Knife Plane Installation

    Science.gov (United States)

    Sysoev, N. I.; Turuk, Yu V.; Kolesnichenko, I. Y.; Lugantsev, B. B.

    2017-10-01

    The reasons for the failure of the pitch stability of the knife-plane installation due to the action of extreme effort in the plane of the seam from the conveyor side on the mechanism of removing sections of mechanized sets are shown. The technique for determining this effort is presented. The constructions of the adaptive mechanisms of the removing sections of mechanized sets with the basements of catamaran type, in the constrictions of which elastic elements (rods) are used, are considered. The constructions of the mechanism of removing a section of the mechanized set with the basement of catamaran type in which the stock of the hydraulic jack is connected with the band loop through the movable rods intermediate basement with a link are worked out. The intermediate basement unloads the stock of the hydraulic jack of the moving installation from the side curving efforts, caused by the action of lateral forces in the plane of the seam on the conveyor side. It increases the reliability and efficiency of work of the knife plane mechanized complex.

  9. Superfund Record of Decision (EPA Region 3): Southern Maryland Wood Treating Site, Hollywood, Maryland (first remedial action) June 1988. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1988-06-29

    The Southern Maryland Wood Treating (SMWT) site is located in Hollywood, St. Mary's County, Maryland. The site is situated within a wetland area in a drainage divide such that runoff from the site discharges into Brooks Run and McIntosh Run tributaries, which flow into the Potomac River. The area surrounding the site is predominantly used for agricultural and residential purposes. Currently, part of the site is being used as a retail outlet for pretreated lumber and crab traps. The waste generated at the site included retort and cylinder sludges, process wastes, and material spillage. These wastes were in six onsite unlined lagoons. The primary contaminants of concern affecting the onsite ground water, soil, surface water, sediments, and debris include: VOCs, PNA, and base/neutral acid extractables. The selected remedial action for the site is included.

  10. Network resilience against intelligent attacks constrained by the degree-dependent node removal cost

    International Nuclear Information System (INIS)

    Annibale, A; Coolen, A C C; Bianconi, G

    2010-01-01

    We study the resilience of complex networks against attacks in which nodes are targeted intelligently, but where disabling a node has a cost to the attacker which depends on its degree. Attackers have to meet these costs with limited resources, which constrains their actions. A network's integrity is quantified in terms of the efficacy of the process that it supports. We calculate how the optimal attack strategy and the most attack-resistant network degree statistics depend on the node removal cost function and the attack resources. The resilience of networks against intelligent attacks is found to depend strongly on the node removal cost function faced by the attacker. In particular, if node removal costs increase sufficiently fast with the node degree, power law networks are found to be more resilient than Poissonian ones, even against optimized intelligent attacks. For cost functions increasing quadratically in the node degrees, intelligent attackers cannot damage the network more than random damages would.

  11. Antagonism of ascorbate against the radioprotective action of cysteamine

    Energy Technology Data Exchange (ETDEWEB)

    Naeslund, M; Ehrenberg, L; Djalali-Behzad, G [Stockholm Univ. (Sweden). Radiobiologiska Institutionen

    1976-07-01

    An investigation has been carried out into the interaction of cysteamine (MEA) and ascorbate on the radiosensitivity of E.coli, with painstaking removal of autoxidation products from glassware. Trace amounts of copper could be effectively removed, and the influence of small amounts of iron contaminating the analytical grade phosphate was assessed. The bacteria were exposed to MEA and/or ascorbate for 1 hour at 37/sup 0/C, irradiation with 42 or 58 krad of /sup 60/Co ..gamma..rays taking place 30 to 40 minutes after the additions. Survival studies demonstrated the reversion of a major fraction of the radioprotective action of MEA (2 or 6 mM) by ascorbate (5 mM) simultaneously present in the medium. Net RNA synthesis, determined by the incorporation of /sup 3/H-uridine, was suppressed by MEA and this was partly reversed by ascorbate. The irradiation of bacterium suspensions containing MEA and ascorbate was found to provoke a conspicuous stimulation of RNA synthesis above the level of unirradiated parallel samples. The effects of some oxidizing treatments (dehydroascorbic acid, hydrogen peroxide, 3.6 ..mu..M FeSO/sub 4/ or 1 ..mu..M CuSO/sub 4/) together with MEA were also studied. Possible mechanisms for the ability of ascorbate to counteract the radioprotective action of MEA are discussed, and the implication of monodehydroascorbate formed during irradiation is suggested.

  12. Treatment methods and comparative risks of thorium removal from waste residues

    Energy Technology Data Exchange (ETDEWEB)

    Porter, R.D.; Hamby, D.M.; Martin, J.E.

    1997-07-01

    This study was done to examine the risks of remediation and the effectiveness of removal methods for thorium and its associated radioactive decay products from various soils and wastes associated with DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). Removal of {sup 230}Th from uranium process residues would significantly reduce the buildup of {sup 226}Ra (half-life of 1600 years), and since {sup 230}Th concentrations at most of the important sites greatly exceed the {sup 226}Ra concentrations, such removal would reduce the accumulation of additional radiation risks associated with {sup 226}Ra and its products; and, if treatment also removed {sup 226}Ra, these risks could be mitigated even further. Removal of {sup 232}Th from thorium process residues would remove the source material for {sup 228}Ra, and since {sup 228}Ra has a half-life of 5.76 years, its control at FUSRAP sites could be done with land use controls for the 30--50 years required for {sup 228}Ra and the risks associated with its decay products to decay away. It must be recognized, however, that treatment methods invariably require workers to process residues and waste materials usually with bulk handling techniques. These processes expose workers to the radioactivity in the materials, therefore, workers would incur radiological risks in addition to industrial accident risks. An important question is whether the potential reduction of future radiological risks to members of the public justifies the risks that are incurred by remediation workers due to handling materials. This study examines, first, the effectiveness of treatment and then the risks that would be associated with remediation.

  13. Impediments to the success of management actions for species recovery.

    Directory of Open Access Journals (Sweden)

    Chooi Fei Ng

    Full Text Available Finding cost-effective management strategies to recover species declining due to multiple threats is challenging, especially when there are limited resources. Recent studies offer insights into how costs and threats can influence the best choice of management actions. However, when implementing management actions in the real-world, a range of impediments to management success often exist that can be driven by social, technological and land-use factors. These impediments may limit the extent to which we can achieve recovery objectives and influence the optimal choice of management actions. Nonetheless, the implications of these impediments are not well understood, especially for recovery planning involving multiple actions. We used decision theory to assess the impact of these types of impediments for allocating resources among recovery actions to mitigate multiple threats. We applied this to a declining koala (Phascolarctos cinereus population threatened by habitat loss, vehicle collisions, dog attacks and disease. We found that the unwillingness of dog owners to restrain their dogs at night (a social impediment, the effectiveness of wildlife crossings to reduce vehicle collisions (a technological impediment and the unavailability of areas for restoration (a land-use impediment significantly reduced the effectiveness of our actions. In the presence of these impediments, achieving successful recovery may be unlikely. Further, these impediments influenced the optimal choice of recovery actions, but the extent to which this was true depended on the target koala population growth rate. Given that species recovery is an important strategy for preserving biodiversity, it is critical that we consider how impediments to the success of recovery actions modify our choice of actions. In some cases, it may also be worth considering whether investing in reducing or removing impediments may be a cost-effective course of action.

  14. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  15. Action of carbon monoxide on the affinity of hemoglobin for oxygen

    Energy Technology Data Exchange (ETDEWEB)

    Vanuxem, D.; Weiller, P.J.; Guillot, C.; Grimaud, C.

    1982-01-01

    The authors have studied the action of carbon monoxide on the affinity of hemoglobin for oxygen by measuring P50 in whole blood and in stripped hemoglobin before and after exposition of blood samples from heavy smokers and polycythemic patients with high levels of HbCO to hyperbaric oxygen (2.2 ata). The concentration of 2,3-diphosphoglycerate was normal although P50 was significantly lowered, not only in whole blood but also in stripped hemoglobin. Hyperbaric oxygen normalized P50 by removing CO radicals from stripped hemoglobin. This may indicate that CO radicals exert a direct action on the hemoglobin molecule, at least at the HbCO levels studied in this work.

  16. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 390: AREAS 9, 10, AND 12 SPILL SITES, NEVADA TEST SITE, NEVADA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-01

    Corrective Action Unit (CAU) 390 consists four Corrective Action Sites (CASs) located in Areas 9, 10, and 12 of the Nevada Test Site. The closure activities performed at the CASs include: (1) CAS 09-99-03, Wax, Paraffin: 2 cubic yards of drilling polymer was removed on June 20,2005, and transported to the Area 9 Landfill for disposal. (2) CAS 10-99-01, Epoxy Tar Spill: 2 cubic feet of asphalt waste was removed on June 20,2005, and transported to the Area 9 Landfill for disposal. (3) CAS 10-99-03, Tar Spills: 3 cubic yards of deteriorated asphalt waste was removed on June 20,2005, and transported to the Area 9 Landfill for disposal. (4) CAS 12-25-03, Oil Stains (2); Container: Approximately 16 ounces of used oil were removed from ventilation equipment on June 28,2005, and recycled. One CAS 10-22-19, Drums, Stains, was originally part of CAU 390 but was transferred out of CAU 390 and into CAU 550, Drums, Batteries, and Lead Materials. The transfer was approved by the Nevada Division of Environmental Protection on August 19,2005, and a copy of the approval letter is included in Appendix D of this report.

  17. Effective action, massive gravitons and the Cosmological Constant

    Energy Technology Data Exchange (ETDEWEB)

    Garattini, Remo [Universita degli Studi di Bergamo, Facolta di Ingegneria, Viale Marconi 5, 24044 Dalmine (Bergamo) (Italy); INFN - sezione di Milano, Via Celoria 16, Milan (Italy)

    2006-03-01

    The one loop effective action in a Schwarzschild background is here used to compute the cosmological constant in presence of massive gravitons. It is shown that the expression of the Zero Point Energy (ZPE) is equivalent to the one computed by means of a variational approach. To handle with ZPE divergences, we use the zeta function regularization. The regularization is closely related to the subtraction procedure appearing in the computation of Casimir energy in a curved background. A renormalization procedure is introduced to remove the infinities together with a renormalization group equation.

  18. Effective action, massive gravitons and the Cosmological Constant

    International Nuclear Information System (INIS)

    Garattini, Remo

    2006-01-01

    The one loop effective action in a Schwarzschild background is here used to compute the cosmological constant in presence of massive gravitons. It is shown that the expression of the Zero Point Energy (ZPE) is equivalent to the one computed by means of a variational approach. To handle with ZPE divergences, we use the zeta function regularization. The regularization is closely related to the subtraction procedure appearing in the computation of Casimir energy in a curved background. A renormalization procedure is introduced to remove the infinities together with a renormalization group equation

  19. Salmon and steelhead in the White Salmon River after the removal of Condit Dam–Planning efforts and recolonization results

    Science.gov (United States)

    Allen, Brady; Engle, Rod O; Zendt, Joseph S; Shrier, Frank C; Wilson, Jeremy T; Connolly, Patrick J.

    2016-01-01

    Condit Dam, at river kilometer 5.3 on the White Salmon River, Washington, was breached in 2011 and completely removed in 2012. This action opened habitat to migratory fish for the first time in 100 years. The White Salmon Working Group was formed to create plans for fish salvage in preparation for fish recolonization and to prescribe the actions necessary to restore anadromous salmonid populations in the White Salmon River after Condit Dam removal. Studies conducted by work group members and others served to inform management decisions. Management options for individual species were considered, including natural recolonization, introduction of a neighboring stock, hatchery supplementation, and monitoring natural recolonization for some time period to assess the need for hatchery supplementation. Monitoring to date indicates that multiple species and stocks of anadromous salmonids are finding and spawning in the now accessible and recovering habitat.

  20. Post-remediation biomonitoring of pesticides and other contaminants in marine waters and sediment near the United Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    LD Antrim; NP Kohn

    2000-05-26

    Marine sediment remediation at the United Heckathorn Superfund Site was completed in April 1997. Water and mussel tissues were sampled in February 1999 from four stations near Lauritzen Canal in Richmond, California, for Year 2 of post-remediation monitoring of marine areas near the United Heckathorn Site. Dieldrin and dichlorodiphenyl trichloroethane (DDT) were analyzed in water samples, tissue samples from resident mussels, and tissue samples from transplanted mussels deployed for 4 months. Concentrations of dieldrin and total DDT in water and total DDT in tissue were compared with Year 1 of post-remediation monitoring, and with preremediation data from the California State Mussel Watch program (tissues) and the Ecological Risk Assessment for the United Heckathorn Superfund Site (tissues and water). Mussel tissues were also analyzed for polychlorinated biphenyls (PCB), which were detected in sediment samples. Chlorinated pesticide concentrations in water samples were similar to preremediation levels and did not meet remediation goals. Mean dieidrin concentrations in water ranged from 0.62 rig/L to 12.5 ng/L and were higher than the remediation goal (0.14 ng/L) at all stations. Mean total DDT concentrations in water ranged from 14.4 ng/L to 62.3 ng/L and exceeded the remediation goal (0.59 ng/L) at all stations. The highest concentrations of both pesticides were found at the Lauritzen Canal/End station. Despite exceedence of the remediation goals, chlorinated pesticide concentrations in Lauritzen Canal water samples were notably lower in 1999 than in 1998. Tissue samples from biomonitoring organisms (mussels) provide an indication of the longer-term integrated exposure to contaminants in the water column, which overcomes the limitations of grab samples of water. Biomonitoring results indicated that the bioavailability of chlorinated pesticides has been reduced from preremediation levels both in the dredged area and throughout Richmond Harbor. Total DDT and

  1. Effects of changes in pumping on regional groundwater-flow paths, 2005 and 2010, and areas contributing recharge to discharging wells, 1990–2010, in the vicinity of North Penn Area 7 Superfund site, Montgomery County, Pennsylvania

    Science.gov (United States)

    Senior, Lisa A.; Goode, Daniel J.

    2017-06-06

    A previously developed regional groundwater flow model was used to simulate the effects of changes in pumping rates on groundwater-flow paths and extent of recharge discharging to wells for a contaminated fractured bedrock aquifer in southeastern Pennsylvania. Groundwater in the vicinity of the North Penn Area 7 Superfund site, Montgomery County, Pennsylvania, was found to be contaminated with organic compounds, such as trichloroethylene (TCE), in 1979. At the time contamination was discovered, groundwater from the underlying fractured bedrock (shale) aquifer was the main source of supply for public drinking water and industrial use. As part of technical support to the U.S. Environmental Protection Agency (EPA) during the Remedial Investigation of the North Penn Area 7 Superfund site from 2000 to 2005, the U.S. Geological Survey (USGS) developed a model of regional groundwater flow to describe changes in groundwater flow and contaminant directions as a result of changes in pumping. Subsequently, large decreases in TCE concentrations (as much as 400 micrograms per liter) were measured in groundwater samples collected by the EPA from selected wells in 2010 compared to 2005‒06 concentrations.To provide insight on the fate of potentially contaminated groundwater during the period of generally decreasing pumping rates from 1990 to 2010, steady-state simulations were run using the previously developed groundwater-flow model for two conditions prior to extensive remediation, 1990 and 2000, two conditions subsequent to some remediation 2005 and 2010, and a No Pumping case, representing pre-development or cessation of pumping conditions. The model was used to (1) quantify the amount of recharge, including potentially contaminated recharge from sources near the land surface, that discharged to wells or streams and (2) delineate the areas contributing recharge that discharged to wells or streams for the five conditions.In all simulations, groundwater divides differed from

  2. Closure Report for Corrective Action Unit 566: EMAD Compound, Nevada National Security Site, Nevada with ROTC-1, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2011-06-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 566: EMAD Compound, Nevada National Security Site, Nevada. Corrective Action Unit 566 comprises Corrective Action Site (CAS) 25-99-20, EMAD Compound, located within Area 25 of the Nevada National Security Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CAU 566 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 566 issued by the Nevada Division of Environmental Protection. From October 2010 through May 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 566: EMAD Compound, Nevada National Security Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 566. Assessment of the data from collected soil samples, and from radiological and visual surveys of the site, indicates the FALs were exceeded for polychlorinated biphenyls (PCBs), semivolatile organic compounds (SVOCs), and radioactivity. Corrective actions were implemented to remove the following: • Radiologically contaminated soil assumed greater than FAL at two locations • Radiologically contaminated soil assumed greater than FAL with

  3. Optimizing the application of magnetic nanoparticles in Cr(VI) removal

    Science.gov (United States)

    Simeonidis, Konstantinos; Kaprara, Efthymia; Mitrakas, Manassis; Tziomaki, Magdalini; Angelakeris, Mavroidis; Vourlias, Georgios; Andritsos, Nikolaos

    2013-04-01

    nanoparticles to reduce Cr(VI) concentration below the regulation limit. The removal capacity is maximized for Fe3O4 nanoparticles due to the high reducing potential of the Fe2+ cations. Furthermore, their applicability was tested in a pilot-scale magnetic separator for the continuous flow removal of nanoparticles after water treatment that takes advantage of the magnetic properties. Acknowledgment This work was implemented within the framework of the Action «Supporting Postdoctoral Researchers» of the Operational Program "Education and Lifelong Learning" (Action's Beneficiary: General Secretariat for Research and Technology), and is co-financed by the European Social Fund (ESF) and the Greek State.

  4. Removing Hair Safely

    Science.gov (United States)

    ... For Consumers Home For Consumers Consumer Updates Removing Hair Safely Share Tweet Linkedin Pin it More sharing ... related to common methods of hair removal. Laser Hair Removal In this method, a laser destroys hair ...

  5. 78 FR 14022 - Endangered and Threatened Wildlife and Plants; Reinstatement of Removal of the Virginia Northern...

    Science.gov (United States)

    2013-03-04

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service 50 CFR Part 17 [Docket No. FWS-R5-ES-2013...; Reinstatement of Removal of the Virginia Northern Flying Squirrel From the List of Endangered and Threatened Wildlife AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule. SUMMARY: We, the U.S. Fish and...

  6. Non-perturbative improvement of the axial current with three dynamical flavors and the Iwasaki gauge action

    International Nuclear Information System (INIS)

    Kaneko, T.; Hashimoto, S.; Aoki, S.; Hoffmann, R.

    2007-03-01

    We perform a non-perturbative determination of the improvement coefficient c A to remove O(a) discretization errors in the axial vector current in three-flavor lattice QCD with the Iwasaki gauge action and the standard O(a)-improved Wilson quark action. An improvement condition with a good sensitivity to c A is imposed at constant physics. Combining our results with the perturbative expansion, c A is now known rather precisely for a -1 >or similar 1.6 GeV. (orig.)

  7. Nuclear reactor with makeup water assist from residual heat removal system

    International Nuclear Information System (INIS)

    Schulz, T.L.; Corletti, M.M.

    1994-01-01

    A pressurized water nuclear reactor uses its residual heat removal system to make up water in the reactor coolant circuit by pumping water from an in-containment refueling water storage tank during staged depressurization of the coolant circuit, the final stage including passive emergency cooling by gravity feed from the refueling water storage tank to the coolant circuit and to flood the containment building. When depressurization commences due to inadvertence or a manageable leak, the residual heat removal system is activated manually and avoids the final stage of depressurization with its flooding of the containment when such action is not necessary, but does not prevent the final stage when it is necessary. A high pressure makeup water storage tank coupled to the reactor coolant circuit holds makeup coolant at the operational pressure of the reactor. The staged depressurization system vents the coolant circuit to the containment, thus reducing the supply of makeup coolant. The level of makeup coolant can be sensed to trigger opening of successive depressurization conduits. The residual heat removal system can also be coupled in a loop with the refueling water supply tanks for cooling the tank. (Author)

  8. Removal costs and claims under the Oil Pollution Act of 1990

    International Nuclear Information System (INIS)

    Smith, R.E.

    1993-01-01

    The Oil Pollution Act of 1990 (OPA 90), enacted on August 18, 1990, changed the nature of federal response to oil spills and substantially increased the remedies available to those damaged by oil spills. Prior to OPA 90, the authority for federal oil spill response was found in section 311 of the Federal Water Pollution Control Act (FWPCA), and the funding for federal responses was provided through a revolving fund established under section 311(k). OPA 90 modified section 311 to authorize the President to open-quotes direct and monitor all Federal, State, and private actions to remove a dischargeclose quotes of oil. OPA 90 also authorized the use of the Oil Spill Liability Trust Fund (OSLTF) for federal removal costs, among other uses, thereby significantly increasing the funding available for federal response activities. The effect of OPA 90 is evolving. There are more cases, more removal costs, and more efforts to recover those costs from responsible parties. There are provisions for compensation for claims but relatively few claims so far. It is expected that the next two years will see substantial increases in the number of claims

  9. Removal Site Evaluation Report to the C-Reactor Seepage Basins (904-066, -067 and -068G)

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E.R. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-07-01

    Removal Site Evaluation Reports are prepared in accordance with Section 300.410 of the National Contingency Plan (NCP) and Section X of the Federal Facility Agreement (FFA). The C-Reactor Seepage Basins (904-066G,-067G,-068G) are listed in Appendix C, Resource Conservation and Recovery Act (RCRA)/Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Units List, of the FFA. The purpose of this investigation is to report information concerning conditions at this unit sufficient to assess the threat (if any) posed to human health and the environment and to determine the need for additional CERCLA action. The scope of the investigation included a review of past survey and investigation data, the files, and a visit to the unit.Through this investigation unacceptable conditions of radioactive contaminant uptake in on-site vegetation were identified. This may have resulted in probable contaminant migration and become introduced into the local ecological food chain. As a result, the SRS will initiate a time critical removal action in accordance with Section 300.415 of the NCP and FFA Section XIV to remove, treat (if required), and dispose of contaminated vegetation from the C-Reactor Seepage Basins. Erosion in the affected areas will be managed by an approved erosion control plan. further remediation of this unit will be conducted in accordance with the FFA.

  10. Removal Site Evaluation Report to the C-Reactor Seepage Basins (904-066, -067 and -068G)

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1997-07-01

    Removal Site Evaluation Reports are prepared in accordance with Section 300.410 of the National Contingency Plan (NCP) and Section X of the Federal Facility Agreement (FFA). The C-Reactor Seepage Basins (904-066G,-067G,-068G) are listed in Appendix C, Resource Conservation and Recovery Act (RCRA)/Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Units List, of the FFA. The purpose of this investigation is to report information concerning conditions at this unit sufficient to assess the threat (if any) posed to human health and the environment and to determine the need for additional CERCLA action. The scope of the investigation included a review of past survey and investigation data, the files, and a visit to the unit.Through this investigation unacceptable conditions of radioactive contaminant uptake in on-site vegetation were identified. This may have resulted in probable contaminant migration and become introduced into the local ecological food chain. As a result, the SRS will initiate a time critical removal action in accordance with Section 300.415 of the NCP and FFA Section XIV to remove, treat (if required), and dispose of contaminated vegetation from the C-Reactor Seepage Basins. Erosion in the affected areas will be managed by an approved erosion control plan. further remediation of this unit will be conducted in accordance with the FFA

  11. Assessment of international remedial technologies for application to Superfund sites

    International Nuclear Information System (INIS)

    Sanning, D.E.

    1990-01-01

    This paper presents some of the logical arguments for conducting research on remedial technologies for contaminated land and groundwater at an international level. It gives information on many of the international organizations that are involved in environmental programs, but it especially gives emphasis to the NATO-CCMS pilot study on Demonstration of Remedial Action Technologies for Contaminated Land and Groundwater. The purpose of the study is to field demonstrate and evaluate new/innovative technologies for remedial action at uncontrolled hazardous waste sites. This study is a logical international extension of the US EPA SITE program. It offers the opportunity to obtain a multiple data base on various remedial action unit processes without any single country having to commit a disproportionate amount of its internal resources to any specific activity. Each participating country provides the necessary resources for those demonstrations which they are contributing to the study. Sites are selected by a majority vote of all participating countries (no country is permitted to vote for its own sites). The study is a 5 year program with participants from Canada, Denmark, Federal Republic of Germany, France, Greece, Italy, Japan, the Netherlands, Norway, Spain, and the US. The need for cost-effective remedial action technologies for hazardous waste sites is a problem of all industrialized countries. The need to build a knowledge base of emerging remedial technologies was the impetus behind the USEPA's lead role and commitment to this pilot study

  12. Action Learning: Avoiding Conflict or Enabling Action

    Science.gov (United States)

    Corley, Aileen; Thorne, Ann

    2006-01-01

    Action learning is based on the premise that action and learning are inextricably entwined and it is this potential, to enable action, which has contributed to the growth of action learning within education and management development programmes. However has this growth in action learning lead to an evolution or a dilution of Revan's classical…

  13. Sodium dichromate expedited response action assessment

    International Nuclear Information System (INIS)

    1993-09-01

    The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) perform an expedited response action (ERA) for the Sodium Dichromate Barrel Disposal Landfill. The ERA lead regulatory agency is Ecology and EPA is the support agency. The ERA was categorized as non-time-critical, which required preparation of an engineering evaluation and cost analysis (EE/CA). The EE/CA was included in the ERA proposal. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA goal is to reduce the potential for any contaminant migration from the landfill to the soil column, groundwater, and Columbia River. Since the Sodium Dichromate Barrel Disposal Landfill is the only waste site within the operable unit, the removal action may be the final remediation of the 100-IU-4 Operable Unit. This ERA process started in March 1992. The ERA proposal went through a parallel review process with Westinghouse Hanford Company (WHC), DOE Richland Operations (RL), EPA, Ecology, and a 30-day public comment period. Ecology and EPA issued an Action Agreement Memorandum in March 1993 (Appendix A). The memorandum directed excavation of all anomalies and disposal of the collected materials at the Hanford Site Central Landfill. Primary field activities were completed by the end of April 1993. Final waste disposal of a minor quantity of hazardous waste was completed in July 1993

  14. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    International Nuclear Information System (INIS)

    Lambert, K.A.; Mitchell, M.M.; Jean, D.; Brown, C.; Byrd, C.S.

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia's Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope

  15. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Lambert, K.A.; Mitchell, M.M. [Brown and Root Environmental, Albuquerque, NM (United States); Jean, D. [MDM/Lamb, Inc., Albuquerque, NM (United States); Brown, C. [Environmental Dimensions, Inc., Albuquerque, NM 87109 (United States); Byrd, C.S. [Sandia National Labs., Albuquerque, NM (United States)

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia`s Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope.

  16. Natural bioventing remediation from tidal wave action at a field site

    International Nuclear Information System (INIS)

    Kampbell, D.H.; Kittel, J.A.

    1996-01-01

    A remediation research study has been implemented at a jet fuel spill site on an island airport. A buried pipeline fracture several years ago resulted in a fuel spill exceeding 160,000 gallons. The site hydrogeology is a fragmented coral matrix with fresh water overlying more dense salt water. Water table fluctuations of about two feet occur once every twelve hours from tidal action. The research approach being pursued is to recover free-phase floating petroleum liquid using vacuum-mediated subsurface skimming wells. The vacuum will create an active vadose zone aeration to enhance aerobic biodegradation processes and vaporization of fuel. Once the floating fuel is removed, a natural bioventing action caused by tidal oscillations will complete remediation of the spill site

  17. Non-perturbative improvement of the axial current with three dynamical flavors and the Iwasaki gauge action

    Energy Technology Data Exchange (ETDEWEB)

    Kaneko, T.; Hashimoto, S. [High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)]|[Graduate Univ. for Advanced Studies, Tsukuba, Ibaraki (Japan); Aoki, S. [Tsukuba Univ., Ibaraki (Japan). Graduate School of Pure and Applied Sciences]|[Brookhaven National Laboratory, Upton, NY (United States). Riken BNL Research Center; Della Morte, M. [CERN, Physics Dept., Geneva (Switzerland); Hoffmann, R. [Colorado Univ., Boulder, CO (United States). Dept. of Physics; Sommer, R. [Deutsches Elektronen-Synchrotron (DESY), Zeuthen (Germany)

    2007-03-15

    We perform a non-perturbative determination of the improvement coefficient c{sub A} to remove O(a) discretization errors in the axial vector current in three-flavor lattice QCD with the Iwasaki gauge action and the standard O(a)-improved Wilson quark action. An improvement condition with a good sensitivity to c{sub A} is imposed at constant physics. Combining our results with the perturbative expansion, c{sub A} is now known rather precisely for a{sup -1}>or similar 1.6 GeV. (orig.)

  18. Superfund 16: Conference and exhibition proceedings. Volume 2

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This conference was held November 6--8, 1995 in Washington, D.C. The purpose of the conference was to provide a multidisciplinary forum dealing with state-of-the-art methods and site characterization technologies for environmental monitoring and remedial action planning of hazardous wastes. Individual papers have been processed separately for inclusion in the appropriate data bases

  19. Superfund 16: Conference and exhibition proceedings. Volume 1

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This conference was held November 6--8, 1995 in Washington, D.C. The purpose of the conference was to provide a multidisciplinary forum dealing with state-of-the-art methods and site characterization technologies for environmental monitoring and remedial action planning of hazardous wastes. Individual papers have been processed separately for inclusion in the appropriate data bases

  20. 105-N Basin sediment removal subcontract acquisition strategy plan

    International Nuclear Information System (INIS)

    Wilsey, D.J.

    1997-01-01

    The 105-N Basin Sediment Removal Subcontract Acquisition Strategy Plan provides a detailed set of actions to specify and procure services and equipment for removal of approximately 400 ft 3 (wet) of radioactive sediment. The plan outlines a cost-effective approach to remove this sediment safely and within an aggressive schedule. This 105-N Basin Sediment Removal Strategy Plan includes the following key elements: a current vendor survey of capabilities and interest in this type of work, confirming that qualified, competitive sources are available, and in the time frame required; a systematic review of the various options for sediment disposal in enough detail to exhaustively uncover pros and cons of each approach; use of a workshop approach to assess different ways to accomplish the work and ensure the disposal options considered are cost and schedule effective; integration of the complicated sampling and characterization process, which is essential to successful execution of the procurement scheme; review of the various subcontracting options to maximize the use of existing technology, existing equipment, and specialized expertise; detailed early planning and strategizing for early identification of problems that can be solved early before they become restraints or potential added costs; tailored design schedule to cover three alternate approaches so that sample characterization will not delay engineering preparation for disposal; support required from various organizations onsite as well as subcontractors, well in advance of the need for that support, improving availability of the proper personnel to support schedule and cost objectives; and provides the possible opportunity to process the sediment in the valve pit and pump pit through this same subcontractor's process

  1. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  2. The role of risk assessment in project planning at the Weldon Spring Quarry, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    Haroun, L.A.; Peterson, J.M.

    1989-01-01

    This paper presents the methodology used to prepare a baseline risk evaluation of the bulk wastes at the quarry. The DOE is proposing to remove these bulk wastes and transport them approximately 6.4 km (4 mi) to a temporary storage facility at the chemical plant area of the Weldon Spring site. The DOE has responsibility for cleanup activities at the Weldon Spring site under its Surplus Facilities Management Program (SFMP). A baseline risk evaluation is an evaluation of the potential impacts on human health and the environment that may result from exposure to releases of contaminants from a site in the absence of site remediation. This evaluation is a key component of the remedial investigation (RI) process, as identified in guidance from the US Environmental Protection Agency (EPA) that addresses sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Response actions at the Weldon Spring quarry are subject to CERCLA requirements because the quarry is listed on the EPA's National Priorities List

  3. Improved hard-thermal-loop effective action for hot QED and QCD

    International Nuclear Information System (INIS)

    Flechsig, F.; Rebhan, A.K.

    1995-01-01

    The conventional results for hard thermal loops, which are the building blocks of resummed perturbation theory in thermal field theories, have collinear singularities when external momenta are light-like. It is shown that by taking into account asymptotic thermal masses these singularities are removed. The thus improved hard thermal loops can be summarized by compact gauge-invariant effective actions, generalizing the ones found by Taylor and Wong, and by Braaten and Pisarski. (orig.)

  4. Mode of action of pectin lyase A of Aspergillus niger on differently C6-substituted oligogalacturonides

    NARCIS (Netherlands)

    Alebeek, van G.J.W.M.; Christensen, T.M.I.E.; Schols, H.A.; Mikkelsen, J.D.; Voragen, A.G.J.

    2002-01-01

    A thorough investigation of the mode of action of Aspergillus niger (4M-147) pectin lyase A (PLA) on differently C6-substituted oligogalacturonides is described. PLA appeared to be very specific for fully methyl-esterified oligogalacturonides: removal of the methyl-ester or changing the type of

  5. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1990-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1990) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. Also included are a number of enforcement actions that had been previously resolved but not published in this NUREG. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  6. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1989-06-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1989) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. Also included are a number of enforcement actions that had been previously resolved but not published in this NUREG. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  7. Magnesium Presence Prevents Removal of Antigenic Nuclear-Associated Proteins from Bovine Pericardium for Heart Valve Engineering.

    Science.gov (United States)

    Dalgliesh, Ailsa J; Liu, Zhi Zhao; Griffiths, Leigh G

    2017-07-01

    Current heart valve prostheses are associated with significant complications, including aggressive immune response, limited valve life expectancy, and inability to grow in juvenile patients. Animal derived "tissue" valves undergo glutaraldehyde fixation to mask tissue antigenicity; however, chronic immunological responses and associated calcification still commonly occur. A heart valve formed from an unfixed bovine pericardium (BP) extracellular matrix (ECM) scaffold, in which antigenic burden has been eliminated or significantly reduced, has potential to overcome deficiencies of current bioprostheses. Decellularization and antigen removal methods frequently use sequential solutions extrapolated from analytical chemistry approaches to promote solubility and removal of tissue components from resultant ECM scaffolds. However, the extent to which such prefractionation strategies may inhibit removal of antigenic tissue components has not been explored. We hypothesize that presence of magnesium in prefractionation steps causes DNA precipitation and reduces removal of nuclear-associated antigenic proteins. Keeping all variables consistent bar the addition or absence of magnesium (2 mM magnesium chloride hexahydrate), residual BP ECM scaffold antigenicity and removed antigenicity were assessed, along with residual and removed DNA content, ECM morphology, scaffold composition, and recellularization potential. Furthermore, we used proteomic methods to determine the mechanism by which magnesium presence or absence affects scaffold residual antigenicity. This study demonstrates that absence of magnesium from antigen removal solutions enhances solubility and subsequent removal of antigenic nuclear-associated proteins from BP. We therefore conclude that the primary mechanism of action for magnesium removal during antigen removal processes is avoidance of DNA precipitation, facilitating solubilization and removal of nuclear-associated antigenic proteins. Future studies are

  8. Operability of glioblastomas: "sins of action" versus "sins of non-action".

    Science.gov (United States)

    Ferroli, Paolo; Schiariti, Marco; Finocchiaro, Gaetano; Salmaggi, Andrea; Castiglione, Melina; Acerbi, Francesco; Tringali, Giovanni; Farinotti, Mariangela; Broggi, Morgan; Roberto, Cordella; Maccagnano, Elio; Broggi, Giovanni

    2013-12-01

    Despite prognosis of glioblastomas is still poor, mounting evidence suggests that more extensive surgical resections are associated with longer life expectancy. However, the surgical indications, at present, are far from uniform and the concept of operability is extremely surgeon-dependant. The results of glioblastoma resection in 104 patients operated on between March 2005 and April 2011 were reviewed with the aim to shed some light on the limits between 'sins of action' (operating upon complex tumors causing a permanent severe deficit) and 'sins of non-action' (considering inoperable tumors that can be resected with good results). Fifty-five patients (54.4 %) (Group 1) presented with a 'disputable' surgical indication because of one or more of the following clinico-radiological aspects: involvement of motor and language areas (39.4 %), deep location (7.7 %), corpus callosum infiltration (13.4 %), or major vessels encasement (8.6 %). Forty-six (42.5 %) patients (Group 2) presented with an 'indisputable' surgical indication (readily accessible tumors in non-eloquent areas). Overall mortality was 2.9 %. The mean overall survival was 19.8 months and not significantly different in the two Groups (20.4 Group 2 and 19.5 months for Group 1; p = 0.7). Patients with GTR and <72 years had a longer survival (p = 0.004 and 0.03, respectively). Seventy patients (69.3 %) showed an uneventful post-operative course, without statistical significance difference between Group 1 and 2. The gross total removal of glioblastoma with many complexities (Group 1) was found to be feasible with acceptable mortality, morbidity and long-term survival rates.

  9. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-03-01

    This Streamlined Approach for Environmental Restoration Plan addresses the actions needed to achieve closure of Corrective Action Unit (CAU) 408, Bomblet Target Area (TTR). Corrective Action Unit 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. Corrective Action Unit 408 comprises Corrective Action Site TA-55-002-TAB2, Bomblet Target Areas. Clean closure of CAU 408 will be accomplished by removal of munitions and explosives of concern within seven target areas and potential disposal pits. The target areas were used to perform submunitions related tests for the U.S. Department of Energy (DOE). The scope of CAU 408 is limited to submunitions released from DOE activities. However, it is recognized that the presence of other types of unexploded ordnance and munitions may be present within the target areas due to the activities of other government organizations. The CAU 408 closure activities consist of: • Clearing bomblet target areas within the study area. • Identifying and remediating disposal pits. • Collecting verification samples. • Performing radiological screening of soil. • Removing soil containing contaminants at concentrations above the action levels. Based on existing information, contaminants of potential concern at CAU 408 include unexploded submunitions, explosives, Resource Conservation Recovery Act metals, and depleted uranium. Contaminants are not expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results.

  10. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 1

    International Nuclear Information System (INIS)

    Krauss, Mark

    2010-01-01

    This Streamlined Approach for Environmental Restoration Plan addresses the actions needed to achieve closure of Corrective Action Unit (CAU) 408, Bomblet Target Area (TTR). Corrective Action Unit 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. Corrective Action Unit 408 comprises Corrective Action Site TA-55-002-TAB2, Bomblet Target Areas. Clean closure of CAU 408 will be accomplished by removal of munitions and explosives of concern within seven target areas and potential disposal pits. The target areas were used to perform submunitions related tests for the U.S. Department of Energy (DOE). The scope of CAU 408 is limited to submunitions released from DOE activities. However, it is recognized that the presence of other types of unexploded ordnance and munitions may be present within the target areas due to the activities of other government organizations. The CAU 408 closure activities consist of: (1) Clearing bomblet target areas within the study area. (2) Identifying and remediating disposal pits. (3) Collecting verification samples. (4) Performing radiological screening of soil. (5) Removing soil containing contaminants at concentrations above the action levels. Based on existing information, contaminants of potential concern at CAU 408 include unexploded submunitions, explosives, Resource Conservation Recovery Act metals, and depleted uranium. Contaminants are not expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results.

  11. Superfund Record of Decision (EPA Region 4): Maxey Flats Nuclear Disposal site, Fleming County, KY. (First remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 280-acre Maxey Flats Nuclear Disposal site is an inactive low-level radioactive waste disposal facility in Fleming County, Kentucky. The estimated 663 people who reside within 2.5 miles of the site use the public water supply for drinking purposes. From 1962 to 1977, Nuclear Engineering Company, Inc. (NECO), operated a solid by-product, source, and special nuclear material disposal facility under a license with the State. Several State investigations in the 1970's revealed that leachate contaminated with tritium and other radioactive substances was migrating from the disposal trenches to unrestricted areas. The Record of Decision (ROD) addresses final remediation of soil, debris, and associated leachate. The primary contaminants of concern affecting the soil and debris are VOCs including benzene, TCE, and toluene; metals including arsenic and lead; and radioactive materials. The selected remedial action for the site is included

  12. Tattoo removal with the alexandrite laser: a clinical and histologic study

    Science.gov (United States)

    Fitzpatrick, Richard E.; Goldman, Mitchel P.

    1993-07-01

    The incident of tattoos in the United States is estimated to be in the range of 9 to 11% of the adult population. Various studies have shown that of these persons having tattoos, as many as 50 to 80% regret having gotten the tattoo and may desire tattoo removal. Previous treatment modalities have all used methods which require tissue destruction in order to remove the tattoo ink. The primary problems with use of these modalities has been the unpredictability of scarring. Also, residual tattoo pigment remaining after completion of the treatment process has been a problem. In response to these problems, the Q-switched lasers have been developed which target the tattoo pigments specifically rather than the tissue containing the tattoo pigment. The alexandrite laser (made by Candela Laser Corporation) has a wavelength of 755 nm and a pulse width of 100 nsec plus or minus 10 nsec. Reflectance studies have indicated that black, blue and green ink should absorb this wavelength relatively well, while red ink would not be expected to absorb this wavelength well. The mechanism of action of this laser is selective absorption of the laser energy by the tattoo pigment resulting in fragmentation of the pigment and then engulfment by tissue macrophages which remove the fragmented tattoo pigment. Preliminary studies using a Yucatan mini pig confirmed these expectations with black ink being easier to remove than blue and green, and red ink being minimally responsive. Higher fluences were more effective.

  13. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  14. PLANNING YOUR REMOVALS

    CERN Multimedia

    Service déménagement; ST Division

    1999-01-01

    To give you better service and avoid lengthy delays, the Removals Service advises you to refrain from programming moves between 26 July and 3 September, as large-scale removals are already planned during this summer period.Thanking you in advance for your co-operation and understanding.Removals Service STTel. 74185 / Mobile 164017

  15. Superfund Record of Decision (EPA Region 5): Buckeye Reclamation Landfill Site, Belmont County, OH. (First remedial action), August 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 658-acre Buckeye Reclamation site contains a 50-acre former landfill in Richland Township, Belmont County, Ohio. Land use in the area is predominantly agricultural, rural residential, and strip mining. A total of 46 domestic wells and springs are located within 1 mile of the site. The original topography of the valley has been altered by coal mining and landfill operations. Solid industrial wastes also were disposed of with municipal wastes elsewhere in the landfill. In 1980, the Waste Pit was filled with sludge, mine spoil, and overburden soil; covered with soil and garbage; and seeded. Results of the RI indicate various levels of contamination in all media sampled, except air. The Record of Decision (ROD) addresses the remediation of contaminated leachate and ground water and eliminates exposure to contaminated surface soil. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, TCE, and toluene; other organics including PAHs; and metals including arsenic, chromium, beryllium, and lead. The selected remedial action for the site is included

  16. Controlling Attention through Action: Observing Actions Primes Action-Related Stimulus Dimensions

    Science.gov (United States)

    Fagioli, Sabrina; Ferlazzo, Fabio; Hommel, Bernhard

    2007-01-01

    Previous findings suggest that planning an action "backward-primes" perceptual dimension related to this action: planning a grasp facilitates the processing of visual size information, while planning a reach facilitates the processing of location information. Here we show that dimensional priming of perception through action occurs even in the…

  17. Post-remediation action radiological report for Surface Impoundments C (3539) and D (3540) at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-12-01

    During August and September 1998, Bechtel Jacobs Company LLC performed a remedial action within Impoundments 3539 and 3540 (Impoundments C and D, respectively) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act Record of Decision (ROD) for the Surface Impoundments Operable Unit. The remedial action included removal of sediments and 0.1 ft of subimpoundment soil. A post-remedial action radiological survey was conducted to provide data to support the Bethel Valley ROD. Data was obtained from (1) a walkover survey for residual gamma radiation on the base of the impoundments, (2) smear surveys for transferable contamination on remaining riprap, and (3) representative sampling of subimpoundment soils. Walkover surveys identified no locations outside the impoundments with gamma exposure levels greater than three times background levels. Smear surveys detected no removable contamination above release limits as specified in 10 CFR 835, Appendix D. Subimpoundment soil samples quantified low levels of residual contamination

  18. PROGRAMMING OFFICE REMOVALS

    CERN Multimedia

    Groupe ST-HM

    2000-01-01

    The Removals Service recommends you to plan your removals well in advance, taking into account the fact that the Transport and Handling Group’s main priority remains the dismantling of LEP and the installation of the LHC. The requests can be made by: http://st.web.cern.ch/st/hm/removal/DEMEE.HTM Thank you for your cooperation.

  19. EPA (Environmental Protection Agency) Indoor-Air Quality Implementation Plan. A report to Congress under Title IV of the Superfund Amendments and Reauthorization Act of 1986: radon gas and indoor air-quality research. Final report

    International Nuclear Information System (INIS)

    1987-06-01

    The EPA Indoor Air Quality Implementation Plan provides information on the direction of EPA's indoor air program, including the Agency's policy on indoor air and priorities for research and information dissemination over the next two years. EPA submitted the report to Congress on July 2, 1987 as required by the Superfund Amendments and Reauthorization Act of 1986. There are five appendices to the report: Appendix A--Preliminary Indoor Air Pollution Information Assessment; Appendix B--FY 87 Indoor Air Research Program; Appendix C--EPA Radon Program; Appendix D--Indoor Air Resource History (Published with Appendix C); Appendix E--Indoor Air Reference Data Base

  20. Housekeeping Closure Report for Corrective Action Unit 463: Areas 2, 3, 9, and 25 Housekeeping Waste Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1999-01-01

    The Federal Facility Agreement and Consent Order was entered into by the State of Nevada, U.S. Department of Energy, and U.S. Department of Defense to identify sites of potential historical contamination and implement corrective actions based on public health and environmental considerations. The facilities subject to this agreement include the Nevada Test Site (NTS), parts of the Tonopah Test Range, parts of the Nellis Air Force Range, the Central Nevada Test Area, and the Project Shoal Area. Corrective Action Sites (CASs) are areas potentially requiring corrective actions and may include solid waste management units, individual disposal, or release sites. Based on geography, technical similarity, agency responsibility, or other appropriate reasons, CASs are grouped together into Corrective Action Units (CAUs) for the purposes of determining corrective actions. This report contains the Closure Verification Forms for cleanup activities that were performed at 13 CASs within CAU 463 on the NTS. The Housekeeping Closure Verification Form for each CAS provides the location, directions to the site, general description, and photographs of the site before and after cleanup activities. Housekeeping activities at these sites included removal of debris (e.g., wooden pallets, metal, glass, and trash) and other material. In addition, these forms confirm prior removal of other contaminated materials such as metal drums or buckets, transformers, lead bricks, batteries, and gas cylinders. Based on these activities, no further action is required at these CASs

  1. Effects of Nonnative Ungulate Removal on Plant Communities and Soil Biogeochemistry in Tropical Forests

    Science.gov (United States)

    Cole, R. J.; Litton, C. M.; Giardina, C. P.; Sparks, J. P.

    2014-12-01

    Non-native ungulates have substantial impacts on native ecosystems globally, altering both plant communities and soil biogeochemistry. Across tropical and temperate ecosystems, land managers fence and remove non-native ungulates to conserve native biodiversity, a costly management action, yet long-term outcomes are not well quantified. Specifically, knowledge gaps include: (i) the magnitude and time frame of plant community recovery; (ii) the response of non-native invasive plants; and (iii) changes to soil biogeochemistry. In 2010, we established a series of paired ungulate presence vs. removal plots that span a 20 yr. chronosequence in tropical montane wet forests on the Island of Hawaii to quantify the impacts and temporal legacy of feral pig removal on plant communities and soil biogeochemistry. We also compared soil biogeochemistry in targeted areas of low and high feral pig impact. Our work shows that both native and non-native vegetation respond positively to release from top-down control following removal of feral pigs, but species of high conservation concern recover only if initially present at the time of non-native ungulate removal. Feral pig impacts on soil biogeochemistry appear to last for at least 20 years following ungulate removal. We observed that both soil physical and chemical properties changed with feral pig removal. Soil bulk density and volumetric water content decreased while extractable base cations and inorganic N increased in low vs. high feral pig impact areas. We hypothesize that altered soil biogeochemistry facilitates continued invasions by non-native plants, even decades after non-native ungulate removal. Future work will concentrate on comparisons between wet and dry forest ecosystems and test whether manipulation of soil nutrients can be used to favor native vs. non-native plant establishment.

  2. Pilot-scale incineration testing of an oxygen-enhanced combustion system

    International Nuclear Information System (INIS)

    Waterland, L.R.; Lee, J.W.; Staley, L.J.

    1989-01-01

    This paper discusses a series of demonstration tests of the American Combustion, Inc., Thermal Destruction System performed under the Superfund innovative technology evaluation (SITE) program. This oxygen-enhanced combustion system was retrofit to the pilot-scale rotary kiln incinerator at EPA's Combustion Research Facility. This system's performance was tested firing contaminated soil from the Stringfellow Superfund Site, both alone and mixed with a hazardous coal tar waste (decanter tank tar sludge form coking operations - K087). Comparative performance with conventional incinerator operation was tested. Test results show that compliance with the hazardous waste incinerator performance standards of 99.99 percent principal organic hazardous constituent (POHC) destruction and removal efficiency (DRE) and particulate emissions of less than 180 mg/dscm at 7 percent O 2 was achieved for all tests. The Pyretron oxygen-enhanced combustion system allowed in-compliance operation at double the mixed waste feedrate possible with conventional incineration, and with a 60 percent increase in charge weight than possible with conventional incineration

  3. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL PLANTS

    Science.gov (United States)

    This report documents a long term performance study of two iron removal water treatment plants to remove arsenic from drinking water sources. Performance information was collected from one system located in midwest for one full year and at the second system located in the farwest...

  4. Early phase clean-up actions after nuclear accidents. Guidelines for the planner. Final report

    International Nuclear Information System (INIS)

    Ulvsand, T.

    1997-06-01

    The work reported has been performed with the purpose of working out a guide for planners of early clean-up actions in nuclear fallout situations and for decision makers in the Nordic countries. The actions considered are hosing of roofs, walls and paved areas, lawn mowing, removal of snow, pruning of trees and bushes and vacuum cleaning of streets. The expected effects, mainly as life time dose reduction, and consequences regarding practicability, waste produced, staffing and protection are presented for urban, suburban and rural living environments. The work has been performed within the fram work of the Nordic Nuclear Safety Research Program 1994-97 (Statens Raeddningsverk). (au)

  5. Closure Report for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Gustafason, D.L.

    2001-01-01

    The Area 25 Vehicle Washdown, Corrective Action Unit (CAU) 240, was clean-closed following the approved Corrective Action Decision Document closure alternative and in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996). The CAU consists of thee Corrective Action Sites (CASs): 25-07-01 - Vehicle Washdown Area (Propellant Pad); 25-07-02 - Vehicle Washdown Area (F and J Roads Pad); and 25-07-03 - Vehicle Washdown Station (RADSAFE Pad). Characterization activities indicated that only CAS 25-07-02 (F and J Roads Pad) contained constituents of concern (COCs) above action levels and required remediation. The COCs detected were Total Petroleum Hydrocarbons (TPH) as diesel, cesium-137, and strontium-90. The F and J Roads Pad may have been used for the decontamination of vehicles and possibly disassembled engine and reactor parts from Test Cell C. Activities occurred there during the 1960s through early 1970s. The F and J Roads Pad consisted of a 9- by 5-meter (m) (30- by 15-foot [ft]) concrete pad and a 14- by 13-m (46-by 43-ft) gravel sump. The clean-closure corrective action consisted of excavation, disposal, verification sampling, backfilling, and regrading. Closure activities began on August 21, 2000, and ended on September 19, 2000. Waste disposal activities were completed on December 12, 2000. A total of 172 cubic meters (223 cubic yards) of impacted soil was excavated and disposed. The concrete pad was also removed and disposed. Verification samples were collected from the bottom and sidewalls of the excavation and analyzed for TPH diesel and 20-minute gamma spectroscopy. The sample results indicated that all impacted soil above remediation standards was removed. The closure was completed following the approved Corrective Action Plan. All impacted waste was disposed in the Area 6 Hydrocarbon Landfill. All non-impacted debris was disposed in the Area 9 Construction Landfill and the Area 23 Sanitary Landfill

  6. Bioaccumulation of polychlorinated biphenyls and organochlorine pesticides in young-of-the-year bluefish (Pomatomus saltatrix) in the vicinity of a Superfund Site in New Bedford Harbor, Massachusetts, and in the adjacent waters.

    Science.gov (United States)

    Deshpande, Ashok D; Dockum, Bruce W; Cleary, Thomas; Farrington, Cameron; Wieczorek, Daniel

    2013-07-15

    Spatial gradients of polychlorinated biphenyls (PCBs) and organochlorine pesticides were examined in the young-of-the-year (YOY) bluefish (Pomatomus saltatrix) in the vicinity of a PCB Superfund Site in New Bedford Harbor, Massachusetts, and in the adjacent waters. PCB concentrations in bluefish varied between different locations, and also among fish from a given location. A generally decreasing gradient in PCB concentrations was evident as the bluefish were collected away from the Superfund Site. The average sum of PCB concentrations were highest for bluefish collected in the Upper Harbor between Interstate-195 Bridge and Coggeshall Street Bridge (Upper Harbor), followed by bluefish in Lower Harbor from north of Popes Island Bridge (Lower Harbor), and bluefish from Outer Harbor south of Hurricane Barrier (Outer Harbor). The levels of PCBs in bluefish from Clarks Cove and PCBs in bluefish from Buzzards Bay were similar and lowest among all bluefish specimens analyzed in the present study. Pesticide concentrations were about one order of magnitude or lower than the PCB concentrations, and the gradient of pesticide concentrations generally followed the gradient of PCB concentrations. Some of the commonly detected pesticides in the order of decreasing concentrations included DDTs and metabolites, heptachlor epoxide, endosulfan sulfate, and α-chlordane. Distribution of PCBs and organochlorine pesticides were examined in the tissues of YOY bluefish from Clarks Cove. PCBs and lipids in the brain samples of YOY bluefish were generally numerically greater than PCBs in the liver samples, but these differences were not statistically significant. PCBs and lipids in hypaxial muscle samples were numerically greater than PCBs in epaxial muscle samples, although these two groups of tissues were not statistically different. Despite the higher susceptibility of lighter PCB homologs to geophysical and biogeochemical weathering processes, the relative dominance of lighter homologs

  7. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  8. Well Completion Report for Corrective Action Unit 443 Central Nevada Test Area Nye County, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    The drilling program described in this report is part of a new corrective action strategy for Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA). The drilling program included drilling two boreholes, geophysical well logging, construction of two monitoring/validation (MV) wells with piezometers (MV-4 and MV-5), development of monitor wells and piezometers, recompletion of two existing wells (HTH-1 and UC-1-P-1S), removal of pumps from existing wells (MV-1, MV-2, and MV-3), redevelopment of piezometers associated with existing wells (MV-1, MV-2, and MV-3), and installation of submersible pumps. The new corrective action strategy includes initiating a new 5-year proof-of-concept monitoring period to validate the compliance boundary at CNTA (DOE 2007). The new 5-year proof-of-concept monitoring period begins upon completion of the new monitor wells and collection of samples for laboratory analysis. The new strategy is described in the Corrective Action Decision Document/Corrective Action Plan addendum (DOE 2008a) that the Nevada Division of Environmental Protection approved (NDEP 2008)

  9. Well Completion Report for Corrective Action Unit 443 Central Nevada Test Area Nye County, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-12-01

    The drilling program described in this report is part of a new corrective action strategy for Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA). The drilling program included drilling two boreholes, geophysical well logging, construction of two monitoring/validation (MV) wells with piezometers (MV-4 and MV-5), development of monitor wells and piezometers, recompletion of two existing wells (HTH-1 and UC-1-P-1S), removal of pumps from existing wells (MV-1, MV-2, and MV-3), redevelopment of piezometers associated with existing wells (MV-1, MV-2, and MV-3), and installation of submersible pumps. The new corrective action strategy includes initiating a new 5-year proof-of-concept monitoring period to validate the compliance boundary at CNTA (DOE 2007). The new 5-year proof-of-concept monitoring period begins upon completion of the new monitor wells and collection of samples for laboratory analysis. The new strategy is described in the Corrective Action Decision Document/Corrective Action Plan addendum (DOE 2008a) that the Nevada Division of Environmental Protection approved (NDEP 2008).

  10. Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. Wells

    2006-11-14

    This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

  11. Closure Report for Corrective Action Unit 135: Areas 25 Underground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. H. Cox

    2001-06-01

    Corrective Action Unit (CAU) 135, Area 25 Underground Storage Tanks, was closed in accordance with the approved Corrective Action Plan (DOE/NV, 2000). CAU 135 consists of three Corrective Action Sites (CAS). Two of these CAS's were identified in the Corrective Action Investigation Data Quality Objective meeting as being improperly identified as underground storage tanks. CAS 25-02-03 identified as the Deluge Valve Pit was actually an underground electrical vault and CAS 25-02-10 identified as an Underground Storage Tank was actually a former above ground storage tank filled with demineralized water. Both of these CAS's are recommended for a no further action closure. CAS 25-02-01 the Underground Storage Tanks commonly referred to as the Engine Maintenance Assembly and Disassembly Waste Holdup Tanks and Vault was closed by decontaminating the vault structure and conducting a radiological verification survey to document compliance with the Nevada Test Site unrestricted use release criteria. The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine Maintenance, Assembly, and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive and cell service area drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999, discussed in ''The Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada'' (DOE/NV, 199a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples exceeded the preliminary action levels for polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. The CAU 135 closure activities consisted of scabbling radiological ''hot spots

  12. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick

    2016-01-01

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage-transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. The purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is

  13. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2016-08-22

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. The purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is

  14. Measurement of volatile organic compounds during start-up of bioremediation of French limited superfund site in Crosby Texas using wind dependent whole-air sampling

    International Nuclear Information System (INIS)

    Pleil, J.D.; Fortune, C.R.; Yoong, M.; Oliver, K.D.

    1993-01-01

    Whole-air sampling was performed before and after the start-up of the bioremediation of an industrial (primarily petrochemical) waste lagoon in Crosby Texas, near Houston. Four 'Sector Samplers' were deployed at the four corners of the French Limited Superfund Site. These samplers collect air into one of two SUMMA polished canisters depending upon wind direction and speed. When the wind blows at the sampler from across the waste lagoon, air is routed to the 'IN' sector canister, otherwise sample is collected in the 'OUT' sector canister. As such, each sampler provides its own background sample, and, upon gas chromatographic analysis, individual compounds can be associated with the waste lagoon. Five sets of 24-hour sector samples were taken; the first set was collected prior to the start of the bioremediation effort and the remaining four sets were taken sequentially for four 24-hour periods after the start-up of the procedure

  15. Plate removal following orthognathic surgery.

    Science.gov (United States)

    Little, Mhairi; Langford, Richard Julian; Bhanji, Adam; Farr, David

    2015-11-01

    The objectives of this study are to determine the removal rates of orthognathic plates used during orthognathic surgery at James Cook University Hospital and describe the reasons for plate removal. 202 consecutive orthognathic cases were identified between July 2004 and July 2012. Demographics and procedure details were collected for these patients. Patients from this group who returned to theatre for plate removal between July 2004 and November 2012 were identified and their notes were analysed for data including reason for plate removal, age, smoking status, sex and time to plate removal. 3.2% of plates were removed with proportionally more plates removed from the mandible than the maxilla. 10.4% of patients required removal of one or more plate. Most plates were removed within the first post-operative year. The commonest reasons for plate removal were plate exposure and infection. The plate removal rates in our study are comparable to those seen in the literature. Copyright © 2015 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  16. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1990-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1990) and includes copies of letters, notices, and orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  17. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1994-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  18. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1991-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1991) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  19. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1993-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  20. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1990-11-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July--September 1990) and includes copies of letters, notices, and orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  1. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1992-08-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1992) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  2. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1991-02-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1990) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  3. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1993-06-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  4. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1990-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1989) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  5. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1991-07-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April-June 1991) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  6. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1992-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1992) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  7. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1993-12-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July--September 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  8. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1993-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1992) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  9. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1991-11-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July--September 1991) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  10. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1992-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1991) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  11. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1992-11-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July - September 1992) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  12. Enforcement actions: Significant actions resolved

    International Nuclear Information System (INIS)

    1989-12-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (July--September 1989) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  13. Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

    Energy Technology Data Exchange (ETDEWEB)

    Maheras, Steven J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Best, Ralph E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ross, Steven B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Buxton, Kenneth A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); England, Jeffery L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); McConnell, Paul E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Massaro, Lawrence M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jensen, Philip J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-30

    A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power reactor sites was conducted. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure and conditions relevant to transportation of SNF and GTCC waste, (3) an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing SNF and GTCC waste, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Every site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. It is expected that additional site visits will be conducted to add to the information presented in the evaluation.

  14. Application of ozonation for pharmaceuticals and personal care products removal from water.

    Science.gov (United States)

    Gomes, João; Costa, Raquel; Quinta-Ferreira, Rosa M; Martins, Rui C

    2017-05-15

    Due to the shortening on natural water resources, reclaimed wastewater will be an important water supply source. However, suitable technologies must be available to guaranty its proper detoxification with special concern for the emerging pharmaceutical and personal care products that are continuously reaching municipal wastewater treatment plants. While conventional biological systems are not suitable to remove these compounds, ozone, due to its interesting features involving molecular ozone oxidation and the possibility of generating unselective hydroxyl radicals, has a wider range of action on micropollutants removal and water disinfection. This paper aims to review the studies dealing with ozone based processes for water reuse by considering municipal wastewater reclamation as well as natural and drinking water treatment. A comparison with alternative technologies is given. The main drawback of ozonation is related with the low mineralization achieved that may lead to the production of reaction intermediates with toxic features. The use of hydrogen peroxide and light aided systems enhance ozone action over pollutants. Moreover, scientific community is focused on the development of solid catalysts able to improve the mineralization level achieved by ozone. Special interest is now being given to solar light catalytic ozonation systems with interesting results both for chemical and biological contaminants abatement. Nowadays the integration between ozonation and sand biofiltration seems to be the most interesting cost effective methodology for water treatment. However, further studies must be performed to optimize this system by understanding the biofiltration mechanisms. Copyright © 2017 Elsevier B.V. All rights reserved.

  15. Can standard sequential extraction determinations effectively define heavy metal species in superfund site soils?

    Energy Technology Data Exchange (ETDEWEB)

    Dahlin, Cheryl L.; Williamson, Connie A.; Collins, Wesley K.; Dahlin, David C.

    2001-01-01

    Speciation and distribution of heavy metals in soils controls the degree to which metals and their compounds are mobile, extractable, and plant-available. Consequently, speciation impacts the success of remediation efforts both by defining the relationship of the contaminants with their environment and by guiding development and evaluation of workable remediation strategies. The U.S. Department of Energy, Albany Research Center (Albany, OR), under a two-year interagency project with the U.S. Environmental Protection Agency (EPA), examined the suitability of sequential extraction as a definitive means to determine species of heavy metals in soil samples. Representative soil samples, contaminated with lead, arsenic, and/or chromium, were collected by EPA personnel from two Superfund sites, the National Lead Company site in Pedricktown, NJ, and the Roebling Steel, Inc., site in Florence, NJ. Data derived from Tessier=s standard three-stage sequential-extraction procedure were compared to data from a comprehensive characterization study that combined optical- and scanning-electron microscopy (with energy-dispersive x-ray and wavelength-dispersive x-ray analyses), x-ray diffraction, and chemical analyses. The results show that standard sequential-extraction procedures that were developed for characterizing species of contaminants in river sediments may be unsuitable for sole evaluation of contaminant species in industrial-site materials (particularly those that contain larger particles of the contaminants, encapsulated contaminants, and/or man-made materials such as slags, metals, and plastics). However, each sequential extraction or comprehensive characterization procedure has it=s own strengths and weaknesses. Findings of this study indicate that the use of both approaches, during the early stages of site studies, would be a best practice. The investigation also highlights the fact that an effective speciation study does not simply identify metal contaminants as

  16. Description of the Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed

  17. Description of the Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

  18. 77 FR 22186 - Removal of Category IIIa, IIIb, and IIIc Definitions; Delay of Effective Date and Reopening of...

    Science.gov (United States)

    2012-04-13

    ...: Direct final rule; delay of effective date and reopening of comment period. SUMMARY: This action delays... possible to do so without incurring expense or delay. The agency may change this rule in light of the...-0019; Amdt. No. 1-67] RIN 2120-AK03 Removal of Category IIIa, IIIb, and IIIc Definitions; Delay of...

  19. Guidance for performing site inspections under CERCLA

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    This guidance presents EPA`s site inspection (SI) strategy. The strategy discusses procedural guidelines to investigate potential Superfund (CERCLA) sites for evaluation pursuant to the Hazard Ranking System (HRS), revised in accordance with the Superfund Amendments and Reauthorization Act of 1986. The HRS is the primary means by which EPA evaluates sites for superfund`s National Priorities List (NPL).

  20. Radiation Area Remedial Action FY 1996 summary report

    International Nuclear Information System (INIS)

    Hayward, W.M.

    1996-11-01

    The Radiation Area Remedial Action (RARA) project is responsible for the interim stabilization and maintenance of the majority of the inactive waste sites at the Hanford Site. These waste sites include approximately 400 individual sites and 4,000 acres. Three facilities were removed from the RARA list near the end of fiscal year (FY) 1996P: the 218-W-4B, 218-E-10, and 218-E-12B Burial Grounds. These three facilities are treatment, storage, and disposal (TSD) sites assigned to Fluor Daniel Hanford. Therefore, the RARA project will no longer perform activities on the inactive portions to maintain clear lines of responsibility (fully with Fluor Daniel Hanford). RARA activities are broken into two broad categories: interim stabilization, and surveillance and maintenance (S and M). Interim stabilization addresses major corrective actions for sites with radioactive surface contamination. A site continues to require S and M once it has received interim stabilization. Vegetation management is a significant activity under the RARA project. The goal is to control vegetation that may grow and spread radioactive contamination