Sample records for superfund remedial program

  1. Superfund fact sheet: The remedial program. Fact sheet

    International Nuclear Information System (INIS)

    1992-09-01

    The fact sheet describes what various actions the EPA can take to clean up hazardous wastes sites. Explanations of how the criteria for environmental and public health risk assessment are determined and the role of state and local governments in site remediation are given. The fact sheet is one in a series providing reference information about Superfund issues and is intended for readers with no formal scientific training

  2. Key Principles of Superfund Remedy Selection

    Science.gov (United States)

    Guidance on the primary considerations of remedy selection which are universally applicable at Superfund sites. Key guidance here include: Rules of Thumb for Superfund Remedy Selection and Role of the Baseline Risk Assessment.

  3. Case studies of community relations on DOE's Formerly Utilized Sites Remedial Action Program as models for Superfund sites

    International Nuclear Information System (INIS)

    Plant, S.W.; Adler, D.G.

    1995-01-01

    Ever since the US Department of Energy (DOE) created its Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974, there has been a community relations program. The community relations effort has grown as FUSRAP has grown. With 20 of 46 sites now cleaned up, considerable experience in working with FUSRAP stakeholders has been gained. Why not share that experience with others who labor on the Superfund sites? Many similarities exist between the Superfund sites and FUSRAP. FUSRAP is a large, multiple-site environmental restoration program. The challenges range from small sites requiring remedial actions measurable in weeks to major sites requiring the full remedial investigation/feasibility study process. The numerous Superfund sites throughout the United States offer the same diversity, both geographically and technically. But before DOE offers FUSRAP's community relations experience as a model, it needs to make clear that this will be a realistic model. As experiences are shared, DOE will certainly speak of the efforts that achieved its goals. But many of the problems that DOE encountered along the way will also be related. FUSRAP relies on a variety of one- and two-way communication techniques for involving stakeholders in the DOE decision-making process. Some of the techniques and experiences from the case studies are presented

  4. Superfund Green Remediation

    Science.gov (United States)

    Green remediation is the practice of considering all environmental effects of site cleanup and incorporating options – like the use of renewable energy resources – to maximize the environmental benefits of cleanups.

  5. Alternating current electrocoagulation for Superfund site remediation

    International Nuclear Information System (INIS)

    Farrell, C.W.

    1991-01-01

    A study is being conducted by Electro-Pure Systems, Inc. (EPS) under the Emerging Technology portion of the U.S. Environmental Protection Agency's (EPA's) Superfund Innovative Technology Evaluation (SITE) Program to study alternating current electrocoagulation for Superfund site remediation. Alternating current electrocoagulation has proven to be effective in agglomerating and removing colloidal solids, metals and certain organic contaminants from surrogate soils prepared from the US EPA's Synthetic Soil Matrix. Treatments under a wide range of operating conditions have enabled the optimum parameter settings to be established for multiple phase separation. Electrocoagulation enables appreciably enhanced filtration and dewatering rates to be realized for metals- and diesel fuel-spiked surrogate soil slurries; such enhancements are prompted by growth in the mean particle size of the clays and particulates from typically < 10 microns to as much as 150 microns depending on the degree of electrocoagulation. Reduction in the total suspended solids content of clays in all slurries in excess of 90% can routinely be achieved. Bench-scale experiments of the metals-spiked surrogate soils indicate that electrocoagulation preferentially concentrates soluble metals into the sludge phase; excellent metals separation (Pb, Cr, Cu, Cd) can be realized. Experiments on surrogate wastes spiked with volatile organics suggest that this technology is not capable of effecting good volatile extractions from the aqueous phase. Reductions in excess of 80% in the total organic carbon (TOC) content of the diesel fuel-spiked surrogates can, however, be achieved

  6. DECISION ANALYSIS OF INCINERATION COSTS IN SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This study examines the decision-making process of the remedial design (RD) phase of on-site incineration projects conducted at Superfund sites. Decisions made during RD affect the cost and schedule of remedial action (RA). Decision analysis techniques are used to determine the...

  7. The remediation process: Approach and elements of the Department of Energy's environmental restoration program in a Superfund environment

    International Nuclear Information System (INIS)

    Lehr, J.C.

    1993-01-01

    The Department of Energy (DOE) operates a large industrial complex located at various production, processing, testing, and research and development installations across the country. During the 40+ years of operation, this complex generated and managed waste to then-current standards. However, some of these waste management practices have subsequently been proven to be inadequate for long-term environmental protection. The Office of Environmental Restoration and Waste Management (EM) was established in 1989, when DOE's top priority changed from nuclear weapons production to environmental cleanup. The Environmental Restoration (ER) Program within EM was tasked to ensure that risks to human health and the environment posed by DOE's past operations at its nuclear facilities and sites are eliminated or reduced to prescribed, safe levels. Since its creation, the ER Program has been one of the fastest growing programs in the Department, demonstrating the Secretary's commitment to the new clean-up priority. (The 1989 budget was $400 million, while the 1993 budget is $1.8 billion.) As new technologies are developed and new management strategies implemented, the program will continue to expand. This paper describes the environmental remediation process from its early assessment phase to the final compliance effort

  8. Report: Remedial Project Manager Turnover at Superfund Sites

    Science.gov (United States)

    Report #2001-M-000015, June 15, 2001. We determined that EPA Region III did not have formal procedures in place to mitigate continuity problems caused by turnover of EPA personnel in the Superfund program.

  9. Restoration principles and criteria: superfund program policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Walker, Stuart

    2006-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) is responsible for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund'. The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund program. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in a consistent manner as with chemical contamination, except to account for the technical differences between radionuclides and chemicals. This consistency is important since at every radioactively contaminated site being addressed under Superfund's primary program for long-term cleanup, the National Priorities List (NPL), chemical contamination is also present. (author)

  10. A strategy for end point criteria for Superfund remediation

    International Nuclear Information System (INIS)

    Hwang, S.T.

    1992-06-01

    Since the inception of cleanup for hazardous waste sites, estimating target cleanup levels has been the subject of considerable investigation and debate in the Superfund remediation process. Establishing formal procedures for assessing human health risks associated with hazardous waste sites has provided a conceptual framework for determining remediation goals and target cleanup levels (TCLs) based on human health and ecological risk consideration. This approach was once considered at variance with the concept of the pre-risk assessment period; that is, cleaning up to the background level, or using containment design or best available control technologies. The concept has been gradually adopted by the regulatory agencies and the parties responsible for cleanup. Evaluation of cleanup strategies at the outset of the planning stage will eventually benefit the parties responsible for cleanup and the oversight organizations, including regulatory agencies. Development of the strategies will provide an opportunity to promote an improvement in the pace and quality of many activities to be carried out. The strategies should help address the issues related to (1) improving remediation management activities to arrive at remediation as expeditiously as possible, (2) developing alternate remediation management activities, (3) identifying obstructing issues to management for resolution, (4) adapting the existing framework to correspond to the change in remediation statutes and guidelines, and (5) providing the basis for evaluating options for the record of decision process. This paper will discuss some of the issues and the research efforts that were addressed as part of the strategies requiring future discussion and comment

  11. Remediation of the Wells G & H Superfund Site, Woburn, Massachusetts.

    Science.gov (United States)

    Bair, E Scott; Metheny, Maura A

    2002-01-01

    Remediation of ground water and soil contamination at the Wells G & H Superfund Site, Woburn, Massachusetts, uses technologies that reflect differences in hydrogeologic settings, concentrations of volatile organic compounds (VOCs), and costs of treatment. The poorly permeable glacial materials that overlie fractured bedrock at the W.R. Grace property necessitate use of closely spaced recovery wells. Contaminated ground water is treated with hydrogen peroxide and ultraviolet (UV) oxidation. At UniFirst, a deep well completed in fractured bedrock removes contaminated ground water, which is treated by hydrogen peroxide, UV oxidation, and granular activated carbon (GAC). The remediation system at Wildwood integrates air sparging, soil-vapor extraction, and ground water pumping. Air stripping and GAC are used to treat contaminated water; GAC is used to treat contaminated air. New England Plastics (NEP) uses air sparging and soil-vapor extraction to remove VOCs from the unsaturated zone and shallow ground water. Contaminated air and water are treated using separate GAC systems. After nine years of operation at W.R. Grace and UniFirst, 30 and 786 kg, respectively, of VOCs have been removed. In three years of operation, 866 kg of VOCs have been removed at Wildwood. In 15 months of operation, 36 kg of VOCs were removed at NEP. Characterization work continues at the Olympia Nominee Trust, Whitney Barrel, Murphy Waste Oil, and Aberjona Auto Parts properties. Risk assessments are being finalized that address heavy metals in the floodplain sediments along the Aberjona River that are mobilized from the Industri-Plex Superfund Site located a few miles upstream.

  12. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  13. Assessment of international remedial technologies for application to Superfund sites

    International Nuclear Information System (INIS)

    Sanning, D.E.

    1990-01-01

    This paper presents some of the logical arguments for conducting research on remedial technologies for contaminated land and groundwater at an international level. It gives information on many of the international organizations that are involved in environmental programs, but it especially gives emphasis to the NATO-CCMS pilot study on Demonstration of Remedial Action Technologies for Contaminated Land and Groundwater. The purpose of the study is to field demonstrate and evaluate new/innovative technologies for remedial action at uncontrolled hazardous waste sites. This study is a logical international extension of the US EPA SITE program. It offers the opportunity to obtain a multiple data base on various remedial action unit processes without any single country having to commit a disproportionate amount of its internal resources to any specific activity. Each participating country provides the necessary resources for those demonstrations which they are contributing to the study. Sites are selected by a majority vote of all participating countries (no country is permitted to vote for its own sites). The study is a 5 year program with participants from Canada, Denmark, Federal Republic of Germany, France, Greece, Italy, Japan, the Netherlands, Norway, Spain, and the US. The need for cost-effective remedial action technologies for hazardous waste sites is a problem of all industrialized countries. The need to build a knowledge base of emerging remedial technologies was the impetus behind the USEPA's lead role and commitment to this pilot study

  14. U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites

    International Nuclear Information System (INIS)

    Carey, Pat; Walker, Stuart

    2008-01-01

    This paper describes the Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities. The Environmental Protection Agency (EPA) implements the Superfund program under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA). From the beginning of the Superfund program, Congress envisioned a role for communities. This role has evolved and expanded during the implementation of the Superfund program. Initially, the CERCLA statute had community involvement requirements designed to inform surrounding communities of the work being done at a site. CERCLA's provisions required 1) development of a community relations plan for each site, 2) establishment of information repositories near each site where all publicly available materials related to the site would be accessible for public inspection, 3) opportunities for the public to comment on the proposed remedy for each site and 4) development of a responsiveness summary responding to all significant comments received on the proposed remedy. In recognition of the need for people living near Superfund sites to be well-informed and involved with decisions concerning sites in their communities, SARA expanded Superfund's community involvement activities in 1986. SARA provided the authority to award Technical Assistance Grants (TAGs) to local communities enabling them to hire independent technical advisors to assist them in understanding technical issues and data about the site. The Superfund Community Involvement Program has sought to effectively implement the statutory community involvement requirements, and to go beyond those requirements to find meaningful ways to involve citizens in the cleanup of sites in their communities. We've structured our program around

  15. Remediation System Evaluation, Savage Municipal Water Supply Superfund Site (PDF)

    Science.gov (United States)

    The Savage Municipal Water Supply Superfund Site, located on the western edge of Milford, New Hampshire, consists of a source area and an extended plume that is approximately 6,000 feet long and 2,500 feet wide.

  16. Assessment of technologies for the remediation of radioactively contaminated Superfund sites

    International Nuclear Information System (INIS)

    1990-01-01

    The report is a screening evaluation of information needs for the development of generic treatability studies for the remediation of Superfund Radiation Sites on the National Priorities List (NPL). It presents a categorization of the 25 radiation sites currently proposed or listed on the NPL, and provides a rating system for evaluating technologies that may be used to remediate these sites. It also identifies gaps in site assessment and technology data and provides information about and recommendations for technology development

  17. Remediation System Evaluation, Douglas Road Landfill Superfund Site

    Science.gov (United States)

    The Douglas Road Landfill Superfund Site is located in St. Joseph County just north of Mishawaka,Indiana. The site consists of a 16-acre capped landfill located on an approximately 32-acre lot (includingthe land purchased in 1999 for a wetlands...

  18. Superfund tio videos: Set A. Overview of superfund, response activities and responsibilities, site discovery, notification, and evaluation. Part 1. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into three sections. Section 1 discusses the development and framework of CERCLA and the Superfund Program and outlines the implementing rules that guide Superfund site cleanups. The Superfund response actions - remedial, removal, and enforcement - are reviewed. Section 2 outlines On-Scene Coordinator's (OSC) and Remedial Project Manager's (RPM) roles and responsibilities in Superfund removal, remedial, and enforcement activities. The other players involved in Superfund response activities also are identified. Section 3 describes how EPA learns of potential Superfund sites and lists the authorities that determine the requirements for site discovery. The procedures used to prioritize the sites and to identify and select sites for remediation are discussed

  19. Long-Term Groundwater Monitoring Optimization, Clare Water Supply Superfund Site, Permeable Reactive Barrier and Soil Remedy Areas, Clare, Michigan

    Science.gov (United States)

    This report contains a review of the long-term groundwater monitoring network for the Permeable Reactive Barrier (PRB) and Soil Remedy Areas at the Clare Water Supply Superfund Site in Clare, Michigan.

  20. U.S. EPA Superfund Program's Policy for Community Involvement at Radioactively Contaminated Sites

    International Nuclear Information System (INIS)

    Martin, K.; Walker, St.

    2009-01-01

    This paper describes the EPA Superfund program's statutory requirements for community involvement. It also discusses the efforts the Superfund program has made that go beyond these statutory requirements to involve communities, and what lessons have been learned by EPA when trying to conduct meaningful community involvement at sites. In addition, it discusses tools that EPA has designed to specifically enhance community involvement at radioactively contaminated Superfund sites. In summary, the Superfund program devotes substantial resources to involving the local community in the site cleanup decision making process. We believe community involvement provides us with highly valuable information that must be available to carefully consider remedial alternatives at a site. We also find our employees enjoy their jobs more. Rather than fighting with an angry public they can work collaboratively to solve the problems created by the hazardous waste sites. We have learned the time and resources we devote at the beginning of a project to developing relationships with the local community, and learning about their issues and concerns is time and resources well spent. We believe the evidence shows this up-front investment helps us make better cleanup decisions, and avoids last minute efforts to work with a hostile community who feels left out of the decision-making process. (authors)

  1. EXPERIENCE IN INCINERATION APPLICABLE TO SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This document can be used as a reference tool for hazardous waste site remediation where incineration is used as a treatment alternative. It provides the user with information garnered from the experiences of others who use incineration. The document presents useful lessons in ev...

  2. Regional economic impact assessment: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Harrison, David; Coughlin, Conor; Hogan, Dylan; Edwards, Deborah A; Smith, Benjamin C

    2018-01-01

    The present paper describes a methodology for evaluating impacts of Superfund remedial alternatives on the regional economy in the context of a broader sustainability evaluation. Although economic impact methodology is well established, some applications to Superfund remedial evaluation have created confusion because of seemingly contradictory results. This confusion arises from failure to be explicit about 2 opposing impacts of remediation expenditures: 1) positive regional impacts of spending additional money in the region and 2) negative regional impacts of the need to pay for the expenditures (and thus forgo other expenditures in the region). The present paper provides a template for economic impact assessment that takes both positive and negative impacts into account, thus providing comprehensive estimates of net impacts. The paper also provides a strategy for identifying and estimating major uncertainties in the net impacts. The recommended methodology was applied at the Portland Harbor Superfund Site, located along the Lower Willamette River in Portland, Oregon, USA. The US Environmental Protection Agency (USEPA) developed remedial alternatives that it estimated would cost up to several billion dollars, with construction durations possibly lasting decades. The economic study estimated regional economic impacts-measured in terms of gross regional product (GRP), personal income, population, and employment-for 5 of the USEPA alternatives relative to the "no further action" alternative. Integr Environ Assess Manag 2018;14:32-42. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  3. Remediation of acid tar sludge at a Superfund site

    International Nuclear Information System (INIS)

    Grajczak, P.; McManus, R.W.

    1995-01-01

    An old refinery site in Texas was safely remediated a year before schedule and for 25% less than original engineering estimates through aggressive project management and the application of an innovative design. The authors planned to solidify the petroleum acid sludge and place it in an on-site, constructed landfill. Careful evaluation of available solidification technologies lead to selection of the DCR process, a patented stabilization process far waste treatment. The technology offered low expansion factor, low reagent to waste ratio, and low cost. The process also proved to be efficient and safe, implemented using a custom-designed, transportable treatment unit. High treatment rates and continuous uninterrupted operation resulted in early completion of the waste treatment task

  4. Remedial design services for Montclair/West Orange and Glen Ridge Superfund sites

    International Nuclear Information System (INIS)

    Urbaniak, T.F.; Tomiczek, P.W. Jr.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites are located 12 miles west of New York City in Essex County, New Jersey. The sites are contaminated with waste materials from radium-processing facilities which operated in the area during the early 1900's. The waste materials, containing radium and other radioactive isotopes were placed in three separate landfill sites. Major public health risks are indoor radon gas build-up and indoor/ outdoor gamma radiation. In 1989, the EPA issued a Record of Decision (ROD) which chose excavation and off-site disposal of material as the preferred alternative. The purpose of this presentation is to highlight key elements of the design process for the remedial action at Montclair. Those key elements are as follows: meeting community relations challenges; measuring radioactive contamination; developing plans and specifications; packaging of remedial action contacts; and continually improving both the process and the designs

  5. DOE'S remedial action assurance program

    International Nuclear Information System (INIS)

    Welty, C.G. Jr.; Needels, T.S.; Denham, D.H.

    1984-10-01

    The formulation and initial implementation of DOE's Assurance Program for Remedial Action are described. It was initiated in FY 84 and is expected to be further implemented in FY 85 as the activities of DOE's Remedial Action programs continue to expand. Further APRA implementation will include additional document reviews, site inspections, and program office appraisals with emphasis on Uranium Mill Tailings Remedial Action Program and Surplus Facilities Management Program

  6. Voluntary program promotes equitable and expedited remediation of contaminated properties

    Energy Technology Data Exchange (ETDEWEB)

    Wolfenden, A.K.; Cambridge, M. [California Environmental Protection Agency, Sacramento, CA (United States). Dept. of Toxic Substances Control

    1995-12-31

    In California, the California Environmental Protection Agency (Cal/EPA) has developed a more equitable and expedited approach for the redevelopment of sites contaminated with hazardous substances. Senate Bill 923 enacted in 1994, established the Expedited Remedial Action Program (ERAP) under Chapter 6.85 of the California Health and Safety Code. This bill responds to a nationwide demand to reform Superfund laws and promote the restoration of blighted and contaminated parcels--often referred to as Brownfields. The program was designed as an alternative to CERCLA, which has come under criticism for being inefficient, unfair and restricting opportunities for effective cleanups. Cal/EPA`s Department of Toxic Substances Control will implement this pilot program. This pilot program, which will eventually comprise 30 sites, provides incentives for voluntary remediation by addressing key economic issues associated with the remediation and redevelopment of contaminated properties.

  7. Remediation System Evaluation, McCormick and Baxter Superfund SiteRemediation System Evaluation, McCormick and Baxter Superfund Site

    Science.gov (United States)

    The McCormick and Baxter Creosoting Company, Portland Plant, Superfund Site is located adjacent tothe Willamette River in Portland, Oregon and addresses contamination of soil, groundwater, and riversediments stemming from creosoting operations...

  8. Mining-related sediment and soil contamination in a large Superfund site: Characterization, habitat implications, and remediation

    Science.gov (United States)

    Juracek, Kyle E.; Drake, K. D.

    2016-01-01

    Historical mining activity (1850–1970) in the now inactive Tri-State Mining District provided an ongoing source of lead and zinc to the environment including the US Environmental Protection Agency Superfund site located in Cherokee County, southeast Kansas, USA. The resultant contamination adversely affected biota and caused human health problems and risks. Remediation in the Superfund site requires an understanding of the magnitude and extent of contamination. To provide some of the required information, a series of sediment and soil investigations were conducted in and near the Superfund site to characterize lead and zinc contamination in the aquatic and floodplain environments along the main-stem Spring River and its major tributaries. In the Superfund site, the most pronounced lead and zinc contamination, with concentrations that far exceed sediment quality guidelines associated with potential adverse biological effects, was measured for streambed sediments and floodplain soils located within or downstream from the most intensive mining-affected areas. Tributary streambeds and floodplains in affected areas are heavily contaminated with some sites having lead and zinc concentrations that are an order of magnitude (or more) greater than the sediment quality guidelines. For the main-stem Spring River, the streambed is contaminated but the floodplain is mostly uncontaminated. Measured lead and zinc concentrations in streambed sediments, lakebed sediments, and floodplain soils documented a persistence of the post-mining contamination on a decadal timescale. These results provide a basis for the prioritization, development, and implementation of plans to remediate contamination in the affected aquatic and floodplain environments within the Superfund site.

  9. Mining-Related Sediment and Soil Contamination in a Large Superfund Site: Characterization, Habitat Implications, and Remediation.

    Science.gov (United States)

    Juracek, K E; Drake, K D

    2016-10-01

    Historical mining activity (1850-1970) in the now inactive Tri-State Mining District provided an ongoing source of lead and zinc to the environment including the US Environmental Protection Agency Superfund site located in Cherokee County, southeast Kansas, USA. The resultant contamination adversely affected biota and caused human health problems and risks. Remediation in the Superfund site requires an understanding of the magnitude and extent of contamination. To provide some of the required information, a series of sediment and soil investigations were conducted in and near the Superfund site to characterize lead and zinc contamination in the aquatic and floodplain environments along the main-stem Spring River and its major tributaries. In the Superfund site, the most pronounced lead and zinc contamination, with concentrations that far exceed sediment quality guidelines associated with potential adverse biological effects, was measured for streambed sediments and floodplain soils located within or downstream from the most intensive mining-affected areas. Tributary streambeds and floodplains in affected areas are heavily contaminated with some sites having lead and zinc concentrations that are an order of magnitude (or more) greater than the sediment quality guidelines. For the main-stem Spring River, the streambed is contaminated but the floodplain is mostly uncontaminated. Measured lead and zinc concentrations in streambed sediments, lakebed sediments, and floodplain soils documented a persistence of the post-mining contamination on a decadal timescale. These results provide a basis for the prioritization, development, and implementation of plans to remediate contamination in the affected aquatic and floodplain environments within the Superfund site.

  10. On using residual risk to assess the cost effectiveness and health protectiveness of remedy selection at superfund sites

    International Nuclear Information System (INIS)

    Katsumata, Peter T.; Kastenberg, William E.

    1998-01-01

    This article examines the importance of determining residual risk and its impact on remedy selection at Superfund Sites. Within this examination, risks are assessed using probabilistic models that incorporate the uncertainty and variability of the input parameters, and utilize parameter distributions based on current and applicable site-specific data. Monte Carlo methods are used to propagate these uncertainties and variabilities through the risk calculations resulting in a distribution for the estimate of both risk and residual risk. Such an approach permits an informed decision based on a broad information base which involves considering the entire uncertainty distribution of risk rather than a point estimate for each exposure scenario. Using the probabilistic risk estimates, with current and applicable site-specific data, alternative decisions regarding cleanup are obtained for two Superfund Sites

  11. Stakeholder value-linked sustainability assessment: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Apitz, Sabine E; Fitzpatrick, Anne G; McNally, Amanda; Harrison, David; Coughlin, Conor; Edwards, Deborah A

    2018-01-01

    Regulatory decisions on remediation should consider affected communities' needs and values, and how these might be impacted by remedial options; this process requires that diverse stakeholders are able to engage in a transparent consideration of value trade-offs and of the distribution of risks and benefits associated with remedial actions and outcomes. The Stakeholder Values Assessment (SVA) tool was developed to evaluate remedial impacts on environmental quality, economic viability, and social equity in the context of stakeholder values and priorities. Stakeholder values were linked to the pillars of sustainability and also to a range of metrics to evaluate how sediment remediation affects these values. Sediment remedial alternatives proposed by the US Environmental Protection Agency (USEPA) for the Portland Harbor Superfund Site were scored for each metric, based upon data provided in published feasibility study (FS) documents. Metric scores were aggregated to generate scores for each value; these were then aggregated to generate scores for each pillar of sustainability. In parallel, the inferred priorities (in terms of regional remediation, restoration, planning, and development) of diverse stakeholder groups (SGs) were used to evaluate the sensitivity and robustness of the values-based sustainability assessment to diverse SG priorities. This approach, which addresses social indicators of impact and then integrates them with indicators of environmental and economic impacts, goes well beyond the Comprehensive Environmental Response, Compensation and Liability Act's (CERCLA) 9 criteria for evaluating remedial alternatives because it evaluates how remedial alternatives might be ranked in terms of the diverse values and priorities of stakeholders. This approach identified trade-offs and points of potential contention, providing a systematic, semiquantitative, transparent valuation tool that can be used in community engagement. Integr Environ Assess Manag 2018

  12. Post-remediation biomonitoring of pesticides and other contaminants in marine waters and sediment near the United Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    LD Antrim; NP Kohn

    2000-05-26

    Marine sediment remediation at the United Heckathorn Superfund Site was completed in April 1997. Water and mussel tissues were sampled in February 1999 from four stations near Lauritzen Canal in Richmond, California, for Year 2 of post-remediation monitoring of marine areas near the United Heckathorn Site. Dieldrin and dichlorodiphenyl trichloroethane (DDT) were analyzed in water samples, tissue samples from resident mussels, and tissue samples from transplanted mussels deployed for 4 months. Concentrations of dieldrin and total DDT in water and total DDT in tissue were compared with Year 1 of post-remediation monitoring, and with preremediation data from the California State Mussel Watch program (tissues) and the Ecological Risk Assessment for the United Heckathorn Superfund Site (tissues and water). Mussel tissues were also analyzed for polychlorinated biphenyls (PCB), which were detected in sediment samples. Chlorinated pesticide concentrations in water samples were similar to preremediation levels and did not meet remediation goals. Mean dieidrin concentrations in water ranged from 0.62 rig/L to 12.5 ng/L and were higher than the remediation goal (0.14 ng/L) at all stations. Mean total DDT concentrations in water ranged from 14.4 ng/L to 62.3 ng/L and exceeded the remediation goal (0.59 ng/L) at all stations. The highest concentrations of both pesticides were found at the Lauritzen Canal/End station. Despite exceedence of the remediation goals, chlorinated pesticide concentrations in Lauritzen Canal water samples were notably lower in 1999 than in 1998. Tissue samples from biomonitoring organisms (mussels) provide an indication of the longer-term integrated exposure to contaminants in the water column, which overcomes the limitations of grab samples of water. Biomonitoring results indicated that the bioavailability of chlorinated pesticides has been reduced from preremediation levels both in the dredged area and throughout Richmond Harbor. Total DDT and

  13. Program management strategies for following EPA guidance for remedial design/remedial action at DOE sites

    International Nuclear Information System (INIS)

    Hopper, J.P.; Chew, J.R.; Kowalski, T.E.

    1991-01-01

    At the US Department of Energy (DOE) facilities, environmental restoration is being conducted in accordance with Federal Facilities Compliance Agreements (or Interagency Agreements). These agreements establish a cooperative working relationship and often define roles, responsibilities and authorities for conduct and oversight of the Remedial Action Programs. The US Environmental Protection Agency (EPA) has guidelines on how to initiate and perform remedial actions for sites they are remediating under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) as amended by the Superfund Amendments and Re-Authorization Act (SARA). This paper addresses some of the difference and commonalities between the DOE project management procedures and EPA guidance documents. This report covers only the RD/RA phase of environmental restoration. On the surface, there are many apparent differences between the DOE and EPA project management processes. Upon closer review, however, many of the differences are the result of applying different terminology to the same phase of a project. By looking for the similarities in the two processes rather than hunting for differences, many communication problems are avoided. Understanding both processes also aids in figuring out when, how and to what extent EPA should participate in the RD/RA phase for DOE lead cleanup activities. The DOE Remedial Design and Remedial Action process is discussed in a stepwise manner and compared to the EPA process. Each element of the process is defined. Activities common to both the EPA and DOE are correlated. The annual DOE budget cycle for remediation projects and the four-year cycle for appropriation of remediation funds are discussed, and the constraints of this process examined. DOE orders as well as other requirements for RD/RA activities are summarized and correlated to EPA regulations where this is possible

  14. Remediation System Evaluation, Tutu Wellfield Superfund Site, St. Thomas, U.S. Virgin Islands

    Science.gov (United States)

    The Tutu Wellfield Superfund Site is a 1.5 square mile site located on the eastern end of St. Thomas, U.S. Virgin Islands (USVI) within the upper Turpentine Run surface drainage basin in the Anna’s Retreat area.

  15. Evaluating public participation in environmental decision-making: EPA's superfund community involvement program.

    Science.gov (United States)

    Susan Charnley; Bruce. Engelbert

    2005-01-01

    This article discusses an 8-year, ongoing project that evaluates the Environmental Protection Agency's Superfund community involvement program. The project originated as a response to the Government Performance and Results Act, which requires federal agencies to articulate program goals, and evaluate and report their progress in meeting those goals. The evaluation...

  16. Application of probabilistic risk assessment: Evaluating remedial alternatives at the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    Ruffle, Betsy; Henderson, James; Murphy-Hagan, Clare; Kirkwood, Gemma; Wolf, Frederick; Edwards, Deborah A

    2018-01-01

    A probabilistic risk assessment (PRA) was performed to evaluate the range of potential baseline and postremedy health risks to fish consumers at the Portland Harbor Superfund Site (the "Site"). The analysis focused on risks of consuming fish resident to the Site containing polychlorinated biphenyls (PCBs), given that this exposure scenario and contaminant are the primary basis for US Environmental Protection Agency's (USEPA's) selected remedy per the January 2017 Record of Decision (ROD). The PRA used probability distributions fit to the same data sets used in the deterministic baseline human health risk assessment (BHHRA) as well as recent sediment and fish tissue data to evaluate the range and likelihood of current baseline cancer risks and noncancer hazards for anglers. Areas of elevated PCBs in sediment were identified on the basis of a geospatial evaluation of the surface sediment data, and the ranges of risks and hazards associated with pre- and postremedy conditions were calculated. The analysis showed that less active remediation (targeted to areas with the highest concentrations) compared to the remedial alternative selected by USEPA in the ROD can achieve USEPA's interim risk management benchmarks (cancer risk of 10 -4 and noncancer hazard index [HI] of 10) immediately postremediation for the vast majority of subsistence anglers that consume smallmouth bass (SMB) fillet tissue. In addition, the same targeted remedy achieves USEPA's long-term benchmarks (10 -5 and HI of 1) for the majority of recreational anglers. Additional sediment remediation would result in negligible additional risk reduction due to the influence of background. The PRA approach applied here provides a simple but adaptive framework for analysis of risks and remedial options focused on variability in exposures. It can be updated and refined with new data to evaluate and reduce uncertainty, improve understanding of the Site and target populations, and foster informed remedial decision

  17. Superfund Record of Decision (EPA Region 5): Ossineke Groundwater Contamination Site, Alpena County, Ossineke, MI. (First remedial action), June 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The Ossineke Ground Water Contamination site is an area overlying a contaminated aquifer in Ossineke, Alpena County, Michigan. The site hydrogeology is characterized by an upper aquifer and lower confined aquifer, both of which supply drinking water to local residents. Historically there have been two contaminant source areas of concern within Ossineke. Area 1 is in the center of the Town of Ossineke where two gas stations are located, consisting of underground storage tanks, and a former automobile rustproofing shop. Area 2 is a laundry and dry cleaning facility that has an associated wash water pond containing chlorinated hydrocarbons and VOCs. The State advised all users of the upper aquifer to stop using their wells. In 1982, the State discovered that a snow plow had hit a gasoline pump causing an unknown amount of gasoline to spill and, subsequently, contaminate the basements of several businesses. In 1986, the State replaced residential wells affected by ground water contamination. Because the contaminants of concern have been confirmed to be related to petroleum releases from underground storage tanks, the Superfund program does not have the authority to address cleanup under CERLCLA. The selected remedial action for the site is that no further action

  18. DOE's Assurance Program for Remedial Action (APRA)

    International Nuclear Information System (INIS)

    Denham, D.H.; Stenner, R.D.; Welty, C.G. Jr.; Needels, T.S.

    1985-01-01

    The US Department of Energy's (DOE) Office of Operational Safety (OOS) is presently developing and implementing the Assurance Program for Remedial Action (APRA) to overview DOE's Remedial Action programs. APRA's objective is to ensure the adequacy of environmental, safety and health (ES and H) protection practices within the four DOE Remedial Action programs: Grand Junction Remedial Action Program (GJRAP), Uranium Mill Tailings Remedial Action Program (UMTRAP), Formerly Utilized Sites Remedial Action Program (FUSRAP), and Surplus Facilities Management Program (SFMP). APRA encompasses all ES and H practices of DOE and its contractors/subcontractors within the four Remedial Action programs. Specific activities of APRA include document reviews, selected site visits, and program office appraisals. Technical support and assistance to OOS is being provided by APRA contractors in the evaluation of radiological standards and criteria, quality assurance measures, radiation measurements, and risk assessment practices. This paper provides an overview of these activities and discusses program to date, including the roles of OOS and the respective contractors. The contractors involved in providing technical support and assistance to OOS are Aerospace Corporation, Oak Ridge Associated Universities, and Pacific Northwest Laboratory

  19. Superfund impasse

    International Nuclear Information System (INIS)

    Dowd, R.M.

    1988-01-01

    EPA recently reported to Congress on the status of the Superfund program. A review of the report reveals that Superfund is a costly, slow-moving juggernaut that consumes an ever-growing share of resources and threatens to overwhelm other, more pressing environmental issues. EPA was given a broad mandate to clean up hazardous-waste sites when Congress enacted the Comprehensive Environmental Response. Compensation, and Liability Act in 1980 and established a $1.6 billion appropriation for a Superfund. In 1986 Congress extended the program for another five years and added $8.5 billion to complete the job-an overly optimistic estimate, as we shall see. Superfund is a huge program; the inventory of potentially hazardous waste sites is large and growing quickly. By the end of fiscal year 1987, EPA's inventory listed 27,571 hazardous-waste sites,and this number is increasing steadily at a rate of about 2500 each year. The General Accounting Office suggests that there may be as many as 150,000 such sites

  20. HISTORY AND ACCOMPLISHMENTS OF THE US EPA'S SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION (SITE) MONITORING AND MEASUREMENT (MMT) PROGRAM

    Science.gov (United States)

    This manuscript presents the history and evolution of the U.S. Environmental Protection Agency's (EPA) Superfund Innovative Technology Evaluation (SITE) Monitoring and Measurement Technology (MMT) Program. This includes a discussion of how the fundamental concepts of a performanc...

  1. DOE's Assurance Program for Remedial Action (APRA)

    International Nuclear Information System (INIS)

    Denham, D.H.; Stenner, R.D.; Welty, C.G. Jr.; Needels, T.S.

    1984-10-01

    The US Department of Energy's (DOE) Office of Operational Safety (OOS) is presently developing and implementing the Assurance Program for Remedial Action (APRA) to overview DOE's Remedial Action programs. APRA's objective is to ensure the adequacy of environmental, safety and health (ES and H) protection practices within the four DOE Remedial Action programs: Grand Junction Remedial Action Program (GJRAP), Uranium Mill Tailings Remedial Action Program (UMTRAP), Formerly Utilized Sites Remedial Action Program (FUSRAP), and Surplus Facilities Management Program (SFMP). APRA encompasses all ES and H practices of DOE and its contractors/subcontractors within the four Remedial Action programs. Specific activities of APRA include document reviews, selected site visits, and program office appraisals. Technical support and assistance to OOS is being provided by APRA contractors in the evaluation of radiological standards and criteria, quality assurance measures, radiation measurements, and risk assessment practices. This paper provides an overview of these activities and discusses progress to date, including the roles of OOS and the respective contractors. The contractors involved in providing technical support and assistance to OOS are Aerospace Corporation, Oak Ridge Associated Universities, and Pacific Northwest Laboratory

  2. Stakeholder views of superfund sites

    International Nuclear Information System (INIS)

    English, M.R.

    1992-01-01

    Nearly ten years have passed since the enactment of the federal Comprehensive Response, Compensation, and Liability Act (CERCLA), usually referred to as open-quotes Superfundclose quotes. Nearly four years have passed since CERCLA's major overhaul through the Superfund Amendments and Reauthorization Act (SARA). Although much still remains to be done under Superfund, there is now enough experience to assess how effectively it is working. A study being undertaken by the University of Tennessee's Waste Management Research and Education Institute will supply a portion of that assessment. The study was completed in the fall of 1990. Our study examines two related issues: the resources that will be needed in the coming years to fulfill the mandate of Superfund and other hazardous waste remediation programs, and the site-level experience to date in implementing CERCLA and SARA. This chapter discusses only the open-quotes site-level experienceclose quotes effort, and only its methodological approach. The purpose of the open-quotes site-level experienceclose quotes effort is to explore what counts as a open-quotes successfulclose quotes site in the eyes of different stakeholders in a Superfund cleanup - e.g., the affected community, the potentially responsible parties (PRPs), state and local officials, and the US Environmental Protection Agency (EPA)

  3. Superfund Record of Decision (EPA Region 2): Glen Ridge Radium, NJ. (First Remedial Action), June 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Glen Ridge Radium site is in the Borough of Glen Ridge and the town of East Orange in Essex County, New Jersey. The soil at the site is contaminated to varying degrees with radioactive waste materials suspected to have originated from radium processing or utilization facilities located nearby during the early 1900s. Temporary radon ventilation systems and gamma-radiation shielding have been installed and maintained by EPA and the State to reduce indoor exposures. The primary contaminant of concern affecting the soil and structures in radium 226 which delays to radon gas. The selected remedial action includes excavation of approximately 41,000 cu yd of highly contaminated soil and an unspecified amount of debris followed by offsite disposal; installation and maintenance of indoor engineering controls at less contaminated properties; environmental monitoring to ensure remedy effectiveness; and continuation of a treatment technology study for future actions

  4. Selected remedy at the Queen City Farms superfund site: A risk management approach

    International Nuclear Information System (INIS)

    Weber, E.F.; Wilson, J.; Kirk, M.; Tochko, S.

    1994-01-01

    A risk management approach at a former industrial waste disposal site in western Washington resulted in a selected remedy that is cost-effective and that meets the CERCLA threshold criterion of protecting human health and the environment. The proposed remedy, which addresses contamination in soil and groundwater, does not require an ARARs waiver and received state and community acceptance. By analyzing the current and potential risk at the site, a proposed remedy was chosen that would control the source and naturally attenuate the groundwater plume. Source control will include removal and treatment of some light nonaqueous phase liquid (LNAPL) and some soil, followed by isolation of the remaining soil and LNAPL within a slurry wall and beneath a multilayer cap. A contingent groundwater extraction and treatment system was included to address uncertainty in the risk characterization. Implementing source control is predicted to result in a steady decline in volatile organic compound levels in the drinking water aquifer through adsorption, degradation, and dispersion. Exposure to groundwater during the period of natural attenuation will be controlled by monitoring, institutional controls, and a thorough characterization of the plume and receptors. 7 figs., 1 tab

  5. EPA [Environmental Protection Agency] SITE [Superfund Innovative Technology Evaluation] program seeks technology proposals

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    EPA will issue an RFP to initiate the SITE-005 solicitation for demonstration of technologies under the Superfund Innovative Technology Evaluation (SITE) Program. This portion of the SITE program offers a mechanism for conducting a joint technology demonstration between EPA and the private sector. The goal of the demonstration program is to provide an opportunity for developers to demonstrate the performance of their technologies on actual hazardous wastes at Superfund sites, and to provide accurate and reliable data on that performance. Technologies selected must be of commercial scale and provide solutions to problems encountered at Superfund Sites. Primary emphasis in the RFP is on technologies that address: treatment of mixed, low level radioactive wastes in soils and groundwater; treatment of soils and sludges contaminated with organics and/or inorganics, materials handling as a preliminary step to treatment or further processing, treatment trains designed to handle specific wastes, are in situ technologies, especially those processes providing alternatives to conventional groundwater pump and treat techniques

  6. Remedial Action Programs annual meeting: Proceedings

    International Nuclear Information System (INIS)

    1988-01-01

    Within the DOE's Office of Nuclear Energy, the Office of Remedial Action and Waste Technology manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. These programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings remedial Action Program and the West Valley Demonstration Project. The programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Surplus Facilities Management Program and was held near DOE Headquarters, in Gaithersburg, Maryland. This volume of proceedings provides the record for the meeting. The proceedings consist of abstracts for each presentation made at the meeting, and the visual aids (if any) used by the speakers. The material is organized in the following pages according to the five different sessions at the meeting: Session 1: Environmental Compliance--Policy; Session 2: Environmental Compliance--Practice; Session 3: Reports from working groups; Session 4: DandD Technology; and Session 5: Remedial Action Technology. The agenda for the meeting and the list of meeting registrants are provided in Appendix A and B, respectively. Individual papers are processed separately for the data base

  7. 1992 update of US EPA's Superfund Innovative Technology Evaluation (SITE) Emerging Technology Program

    International Nuclear Information System (INIS)

    Lewis, N.M.; Barkley, N.P.; Williams, T.

    1992-01-01

    The Superfund Innovative Technology Evaluation (SITE) Emerging Technology Program (ETP) has financially supported further development of bench- and pilot-scale testing and evaluation of innovative technologies for use at hazardous waste sites for five years. The ETP was established under the Superfund Amendments and Reauthorization Act (SARA) of 1986. The ETP complies with the goal of the SITE Program to promote, accelerate and make commercially available the development of alternative/innovative treatment technologies for use at Superfund sites. Technologies are submitted to the ETP through yearly solicitations for Preproposals. Applicants are asked to submit a detailed project proposal and a cooperative agreement application that requires Developer/EPA cost sharing. EPA co-funds selected Developers for one to two years. Second-year funding requires documentation of significant progress during the first year. Facilities, equipment, data collection, performance and development are monitored throughout the project. The US Department of Energy (DOE) and the US Air Force (USAF) are participants in the ETP. DOE has co-funded ETP projects since 1990 and the USAF since 1991. A goal of the ETP is to move developed technologies to the field-demonstration stage. A developer may be considered for participation in the SITE Demonstration Program if performance in the ETP indicates the technology is field-ready for evaluation. Six technology categories: biological, chemical, materials handling, physical, solidification/stabilization and thermal, are presently in the ETP. Technologies of primary interest to EPA are those that can treat complex mixtures of hazardous organic and inorganic contaminants and provide improved solids handling and/or pretreatment. An account of the background and progress of the ETP's first five years is presented in this paper. Technologies currently in the ETP are noted, and developers and EPA Project Managers, are listed. 4 refs., 11 figs., 6 tabs

  8. Remedial Action Program annual conference: Proceedings

    International Nuclear Information System (INIS)

    1990-01-01

    Within the DOE's Office of Environmental Restoration ampersand Waste Management, the Office of Environmental Restoration manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. The programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings Remedial Action Program, and the West Valley Demonstration Project. These programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive or hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Uranium Mill Tailings Remedial Action Project, DOE-AL, and was held in Albuquerque, NM. This volume of proceedings is the record of that conference. The proceedings consist of abstracts, summaries, or actual text for each presentation made and any visual aids used by the speakers

  9. Third party Superfund lawsuit defense influenced by the choice of remediation method

    International Nuclear Information System (INIS)

    Haddad, B.I.; Parish, G.B.

    1994-01-01

    Paper Company A was sued in a third party action suit initiated by a local utility who was a potential responsible party (PRP) to a contaminated site regulated under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) program. In addition to Paper Company A, other parties to the third party suit included Paper Company B and Contractor C, a demolition contractor/waste hauler. Other PRPs included land owners where the contaminated debris was dumped, Mr. and Mrs. D. Based on background information, Paper Company A dumped coal ash, off quality feed stock, wood and trash north of the D-property. Paper Company B admitted dumping material north of the D-property. Samples of industrial sludges on the D-property had properties characteristic of the Paper Company B's sludges. Paper Company B dumped ash, chromium contaminated gypsum sludge and other waste. The utility company dumped ash on the D-property. Contractor C hauled demolition debris to the D property. A third PRP, Company E was the original owner of the buildings that were demolished. This PRP settled with the EPA as part of a bankruptcy settlement. The hazardous substances encountered at the site included PCBs, chromium and lead in the coal ash, demolition debris and industrial sludges. Disposal of material containing hazardous substances resulted in PCB contaminated debris and sediment, and chromium and lead contamination in the sediment, soil and groundwater

  10. In Situ Remediation Integrated Program: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces, in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP intends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years. ISR IP is an applied research and development program broadly addressing known DOE environmental restoration needs. Analysis of a sample of 334 representative sites by the Office of Environmental Restoration has shown how many sites are amenable to in situ remediation: containment--243 sites; manipulation--244 sites; bioremediation--154 sites; and physical/chemical methods--236 sites. This needs assessment is focused on near-term restoration problems (FY93--FY99). Many other remediations will be required in the next century. The major focus of the ISR EP is on the long term development of permanent solutions to these problems. Current needs for interim actions to protect human health and the environment are also being addressed.

  11. In Situ Remediation Integrated Program: Technology summary

    International Nuclear Information System (INIS)

    1994-02-01

    The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces, in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP intends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years. ISR IP is an applied research and development program broadly addressing known DOE environmental restoration needs. Analysis of a sample of 334 representative sites by the Office of Environmental Restoration has shown how many sites are amenable to in situ remediation: containment--243 sites; manipulation--244 sites; bioremediation--154 sites; and physical/chemical methods--236 sites. This needs assessment is focused on near-term restoration problems (FY93--FY99). Many other remediations will be required in the next century. The major focus of the ISR EP is on the long term development of permanent solutions to these problems. Current needs for interim actions to protect human health and the environment are also being addressed

  12. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  13. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  14. Superfund Sites

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This layer represents active Superfund Sites published by the Environmental Protection Agency (EPA). These data were extracted from the Superfund Enterprise...

  15. Superfund Technical Assistance Grants

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes data related to the Superfund Technical Assistance Grant program, including grant number, award amounts, award dates, period of performance,...

  16. Superfund Record of Decision (EPA region 2): Glen Ridge Radium site, Essex County, NJ. (Second remedial action), June 1990. Final report

    International Nuclear Information System (INIS)

    1990-01-01

    The 90-acre Glen Ridge Radium site is a residential community in the Borough of Glen Ridge, Essex County, New Jersey. The site is adjacent to another Superfund site, the Montclair/West Orange site. The Glen Ridge site includes a community of 274 properties serviced by surface reservoirs in northern New Jersey. In the early 1900s, a radium processing or utilization facility was located in the vicinity of the site. EPA investigations in 1981 and 1983 confirmed the presence of gamma radiation contamination in the Glen Ridge area and in several adjacent houses. The ROD complements the previous 1989 ROD for this site and provides a final remedy. The primary contaminant of concern affecting the soil is radium 226

  17. DOE In Situ Remediation Integrated Program

    International Nuclear Information System (INIS)

    Yow, J.L. Jr.

    1993-01-01

    The In Situ Remediation Integrated Program (ISRP) supports and manages a balanced portfolio of applied research and development activities in support of DOE environmental restoration and waste management needs. ISRP technologies are being developed in four areas: containment, chemical and physical treatment, in situ bioremediation, and in situ manipulation (including electrokinetics). the focus of containment is to provide mechanisms to stop contaminant migration through the subsurface. In situ bioremediation and chemical and physical treatment both aim to destroy or eliminate contaminants in groundwater and soils. In situ manipulation (ISM) provides mechanisms to access contaminants or introduce treatment agents into the soil, and includes other technologies necessary to support the implementation of ISR methods. Descriptions of each major program area are provided to set the technical context of the ISM subprogram. Typical ISM needs for major areas of in situ remediation research and development are identified

  18. Remedial action programs annual meeting: Meeting notes

    International Nuclear Information System (INIS)

    1987-01-01

    The US Department of Energy Grand Junction Projects Office was pleased to host the 1987 Remedial Action programs Annual Meeting and herein presents notes from that meeting as prepared (on relatively short notice) by participants. These notes are a summary of the information derived from the workshops, case studies, and ad hoc committee reports rather than formal proceedings. The order of the materials in this report follows the actual sequence of presentations during the annual meeting

  19. Superfund Record of Decision (EPA Rregion 4): Oak Ridge Reservation (USDOE), (Operable Unit 3), Anderson County, Oak Ridge, TN. (Second remedial action), September 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Oak Ridge Reservation (ORR) (USDOE) (Operable Unit 3) site is an active nuclear weapons component manufacturing facility located in Oak Ridge, Anderson County, Tennessee. The Y-12 plant, which is addressed as Operable Unit 3, is one of several hundred waste disposal sites or areas of contamination at the ORR site requiring Superfund remedial action. The site occupies the upper reaches of East Fork Poplar Creek (EFPC) in Bear Creek Valley. From 1940 to the present, the Y-12 plant has been used to produce nuclear weapons components. From 1955 to 1963, mercury was used in a column-exchange process to separate lithium isotopes. Testing of the three concrete tanks showed that the tank sediment contained mercury, and that contaminated waste is still being discharged into two of the three tanks. The Record of Decision (ROD) focuses on the contaminated sediment in the sedimentation tanks as an interim action. The primary contaminants of concern affecting the sediment are mercury, a metal and radioactive materials. The selected interim remedial action for the site is included

  20. Superfund Query

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Superfund Query allows users to retrieve data from the Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) database.

  1. CERCLA-linked environmental impact and benefit analysis: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    McNally, Amanda D; Fitzpatrick, Anne G; Mirchandani, Sera; Salmon, Matthew; Edwards, Deborah A

    2018-01-01

    This analysis focused on evaluating the environmental consequences of remediation, providing indicators for the environmental quality pillar of 3 "pillars" of the Portland Harbor Sustainability Project (PHSP) framework (the other 2 pillars are economic viability and social equity). The project an environmental impact and benefit analysis (EIBA) and an EIBA-based cost-benefit analysis. Metrics developed in the EIBA were used to quantify and compare remedial alternatives' environmental benefits and impacts in the human and ecological domains, as a result of remedial actions (relative to no action). The cost-benefit results were used to evaluate whether remediation costs were proportionate or disproportionate to the environmental benefits. Alternatives B and D had the highest overall benefit scores, and Alternative F was disproportionately costly relative to its achieved benefits when compared to the other remedial alternatives. Indeed, the costlier alternatives with larger remedial footprints had lower overall EIBA benefit scores-because of substantially more air emissions, noise, and light impacts, and more disturbance to business, recreational access, and habitat during construction-compared to the less costly and smaller alternatives. Put another way, the adverse effects during construction tended to outweigh the long-term benefits, and the net environmental impacts of the larger remedial alternatives far outweighed their small incremental improvements in risk reduction. Results of this Comprehensive Environmental Response Compensation and Liability Act (CERCLA)-linked environmental analysis were integrated with indicators of economic and social impacts of remediation in a stakeholder values-based sustainability framework. These tools (EIBA, EIBA-based cost-benefit analysis, economic impact assessment, and the stakeholder values-based integration) provide transparent and quantitative evaluations of the benefits and impacts associated with remedial alternatives

  2. The role of risk assessment in remedial action cleanup programs (RACP): A case history

    International Nuclear Information System (INIS)

    Fessler, R.G.; Bergmann, W.R.; Greenberg, A.J.

    1988-01-01

    A RACP (Remedial Action Cleanup Program) selects site cleanup criteria that protect human health and the environment and are cost effective. They generally use existing environmental standards and/or guidelines which include safe drinking water, RCRA groundwater protection, threshold limit values and air quality standards, and recommended soil cleanup level guidelines. If these are the only criteria used, the RACP may be more stringent and expensive than necessary. Another step, a risk assessment program, should then be considered in the cleanup decision process. A risk assessment uses chemical concentrations observed in soils, groundwater, and air to project their impact on human health and the environment. Toxicological data on human exposure to these concentrations (LD 50s and carcinogenic action levels) are used to assess risks to human health and the environment. The risk assessment also considers the probability of exposure. E.g., remedial programs at Superfund sites consider three criteria in order to assess risks to human health and the environment: (1) pathways of exposure, (2) population at risk, and (3) chemicals of concern. By eliminating or severely limiting the significance of any criteria, the site may no longer represent a significant risk. This paper presents a RACP case history where a risk assessment was needed to select a cost effective and environmentally acceptable cleanup program

  3. Superfund record of decision (EPA Region 6): Oklahoma Refining Company, Cyril, OK. (First remedial action), June 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 160-acre Oklahoma Refining site is a petroleum refinery located on the eastern edge of Cyril, Oklahoma, in Caddo County. The facility included refinery process areas, bulk storage tanks, waste pits, wastewater treatment ponds, and a land treatment area. During the mid-1980's, EPA investigations revealed large-scale organic and heavy metal contamination of onsite soil and ground water. In 1990, EPA conducted a removal action, which included characterization and removal of drums, plugging wells, and wildlife protection measures. The ROD addresses the remediation of onsite contaminated soil, sediment, surface water, and ground water as a final remedy. The primary contaminants of concern affecting the soil, sediment, ground water, and surface water are VOCs, including benzene, toluene, and xylenes; other organics, including PAHs and phenols; and metals, including arsenic, chromium, and lead. The selected remedial action for the site is included

  4. 32 CFR 634.10 - Remedial driver training programs.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Remedial driver training programs. 634.10 Section 634.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Driving Privileges § 634.10 Remedial driver training programs. (a) Navy...

  5. Superfund record of decision (EPA Region 3): Paoli Rail Yard, Paoli, PA. (First remedial action), July 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 428-acre Paoli Rail Yard site is a maintenance, storage, and repair facility located north of Paoli in Chester County, Pennsylvania. Soil contamination in and around the car shop is attributed to releases of fuel oil and PCB-laden transformer fluid from rail cars during maintenance and repair activities. In 1985, EPA identified PCB contamination in soil and sediment, and on building surfaces. The rail companies agreed to address site clean-up activities, including erosion, sedimentation, and stormwater characteristics and control, decontamination, soil sampling, excavation of 3,500 cubic yards residential soil, and implementation of worker protection measures. The ROD provides a final remedy for contaminated soil (from the rail yard and residences), sediment, and structures at the Paoli Rail Yard, and contaminated ground water. The primary contaminants of concern affecting the soil, sediment, debris, and ground water are VOCs, including benzene, ethylbenzene, toluene, xylenes; and other organics, including PCBs. The selected remedial action for the site are included

  6. Superfund Record of Decision (EPA Region 2): Montclair/West Orange, Radium, NJ. (First Remedial Action), June 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Montclair/West Orange Radium site is in the towns of Montclair and West Orange in Essex County, New Jersey. The soil at the site is contaminated with radioactive-waste materials suspected to have originated from radium processing or utilization facilities located nearby during the early 1900s. Temporary radon ventilation systems and gamma-radiation shielding have been installed and maintained by EPA and the State to reduce indoor exposures. The primary contaminant of concern affecting the soil and structures is radium 226 which decays to radon gas. The selected remedial action for the site includes excavation of approximately 41,000 cu yd of highly contaminated soil and an unspecified amount of debris followed by offsite disposal; installation and maintenance of indoor engineering controls at less contaminated properties; environmental monitoring to ensure remedy effectiveness; and continuation of a treatment technology study for future actions. EPA deferred a final continuation of a treatment-technology study for future action

  7. Superfund Record of Decision (EPA Region 2): Ramapo Landfill Site, Rockland County, NY. (First remedial action), March 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 60-acre former landfill site is located on a 96-acre tract in the Town of Ramapo, Rockland County, New York, about 35 miles northwest of New York City. Utility corridors lie on three sides of the site, including high-voltage power transmission lines. The site is currently being used as a compaction and transfer facility by the Town of Ramapo. Trash and debris are weighed at a weigh station/guardhouse, compacted at a baler facility in the northeastern corner of the site, and transferred to the Al Turi Landfill in Goshen, New York. The ROD represents the entire remedial action for the site by controlling source of contamination and the generation of leachate, and treatment of contaminated ground water. The primary contaminants of concern affecting soil, ground water, and surface water are VOCs, including benzene; other organics; and metals, including arsenic, chromium, and lead. The selected remedial action for the site is included

  8. Superfund Record of Decision (EPA Region 2): NL Industries, Salem County, Pedricktown, NJ. (First remedial action), September 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-27

    The 44-acre NL Industries site is an inactive, secondary lead smelting facility in Pedricktown, Salem County, New Jersey. The site overlies the Cape May aquifer, a potential source of drinking water for local residents. In 1989, EPA began a multi-phased removal action. The Focused Feasibility Study resulted in the issuance of the Early Remedial Action Record of Decision (ROD), designated as Operable Unit (OU2). The nature and extent of remaining contamination on the site and areas adjacent to the site in various environmental media, such as soil, sediment, ground water, surface water, and air, are currently being evaluated and will be addressed as OU1 in a subsequent ROD. The primary contaminants of concern affecting the slag and lead oxide piles, sediment, debris, and standing surface water are metals including arsenic, chromium, and lead. The selected remedial action for the site is included.

  9. Superfund Record of Decision (EPA Region 2): Sinclair Refinery, Allegany County, Wellsville, NY. (Second remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The Sinclair Refinery site is a former refinery in Wellsville, Allegany County, New York. The site is composed of a 90-acre refinery area, 10-acre landfill area, and 14-acre offsite tank farm. From 1901 to 1958, the site was used to process Pennsylvania grade crude oil until a fire in 1958 halted operations. Currently, some private companies and the State University of New York occupy the site. A 1981 site inspection revealed that debris from the eroding landfill area has washed into and contaminated the Genesee River. The ROD addresses OU2, remediation of the remaining contaminated areas at the site located within the 90-acre refinery area and the offsite tank farm including the contaminated ground water beneath the refinery. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene and xylenes, semi-volatile compounds including naphthalene and nitrobenzene, and metals including arsenic and lead. The selected remedial action for the site is included

  10. New York's new Superfund regulations: Implications for federal and other state programs

    International Nuclear Information System (INIS)

    Pavetto, C.S.; Rubinton, D.S.

    1994-01-01

    The need for cleaning up hazardous waste disposal sites was identified early in New York. In fact, New York's ''Superfund'' statute preceded the federal Superfund law thereby providing a model for CERCLA. Moreover, there are currently almost as many sites on New York's Registry of Inactive Hazardous Waste Disposal sites as there are sites on the National Priorities List. While New York's law served as a model for the federal CERCLA, CERCLA, in turn, has served as a model for other states' statutes. Similarly, lessons learned from the implementation of state Superfund statutes such as New York's can be instructive for those whose work involves dealing with CERCLA-type issues. This is because the problems associated with site restoration and cleanup, such as exceedingly complex site review and evaluation processes, high transaction costs, and difficulties in prioritizing sites for clean-up based upon the threat or risk of environmental harm, are universal

  11. Technology needs and trends for hazardous waste site remediation

    International Nuclear Information System (INIS)

    Kovalick, W.W. Jr.

    1995-01-01

    Over the next few decades, federal, state, and local governments and private industry will commit billions of dollars annually to clean up sites contaminated with hazardous waste and petroleum products. While these needs represent an obligation for society, they also represent an important business opportunity for vendors of remediation services. This presentation assesses the remediation market by characterizing sites that comprise the demand for cleanup services, observing remedy selection trends in the Superfund program, and discussing gaps in the supply of technologies

  12. In Situ Remediation Integrated Program: FY 1994 program summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The US Department of Energy (DOE) established the Office of Technology Development (EM-50) as an element of the Office of Environmental Management (EM) in November 1989. In an effort to focus resources and address priority needs, EM-50 introduced the concept of integrated programs (IPs) and integrated demonstrations (IDs). The In Situ Remediation Integrated Program (ISR IP) focuses research and development on the in-place treatment of contaminated environmental media, such as soil and groundwater, and the containment of contaminants to prevent the contaminants from spreading through the environment. Using in situ remediation technologies to clean up DOE sites minimizes adverse health effects on workers and the public by reducing contact exposure. The technologies also reduce cleanup costs by orders of magnitude. This report summarizes project work conducted in FY 1994 under the ISR IP in three major areas: treatment (bioremediation), treatment (physical/chemical), and containment technologies. Buried waste, contaminated soils and groundwater, and containerized waste are all candidates for in situ remediation. Contaminants include radioactive waste, volatile and nonvolatile organics, heavy metals, nitrates, and explosive materials.

  13. In Situ Remediation Integrated Program: FY 1994 program summary

    International Nuclear Information System (INIS)

    1995-04-01

    The US Department of Energy (DOE) established the Office of Technology Development (EM-50) as an element of the Office of Environmental Management (EM) in November 1989. In an effort to focus resources and address priority needs, EM-50 introduced the concept of integrated programs (IPs) and integrated demonstrations (IDs). The In Situ Remediation Integrated Program (ISR IP) focuses research and development on the in-place treatment of contaminated environmental media, such as soil and groundwater, and the containment of contaminants to prevent the contaminants from spreading through the environment. Using in situ remediation technologies to clean up DOE sites minimizes adverse health effects on workers and the public by reducing contact exposure. The technologies also reduce cleanup costs by orders of magnitude. This report summarizes project work conducted in FY 1994 under the ISR IP in three major areas: treatment (bioremediation), treatment (physical/chemical), and containment technologies. Buried waste, contaminated soils and groundwater, and containerized waste are all candidates for in situ remediation. Contaminants include radioactive waste, volatile and nonvolatile organics, heavy metals, nitrates, and explosive materials

  14. Superfund record of decision (EPA Region 10): Teledyne Wah Chang, Albany, OR. (first remedial action), December 1989

    International Nuclear Information System (INIS)

    1989-01-01

    The Teledyne Wah Chang (TWC) site, in Millersburg, Oregon, is an active plant used to produce nonferrous metals and products. The site consists of a 110-acre plant site, which contains the plant's former sludge ponds, and a 115-acre farm site, which contains four active wastewater sludge ponds. Portions of the TWC site are within the Willamette River's 100- and 500-year flood plain. The Wah Chang Corporation began operating a U.S. Bureau of Mines zirconium metal sponge pilot plant under contract with the U.S. Atomic Energy Commission in 1956. Additional facilities were subsequently built near the plant beginning in 1957 to produce nonferrous metals and products. The Lower River Solids Pond (LRSP) and Schmidt Lake sludge pond, which stored wastewater generated from the plant operations, are being addressed by this remedial action. The sludge in both the LRSP and Schmidt Lake contains heavy metals, organic compounds, and trace levels of radionuclides. The selected remedial action for the site includes excavation of 85,000 cubic yards of sludge with partial solidification of the sludge, followed by offsite disposal in a permitted solid waste landfill

  15. Superfund Record of Decision (EPA Region 5): Midco II, Gary, IN. (First remedial action), (amendment), April 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The 7-acre Midco II site is an abandoned chemical waste storage and disposal facility in Gary, Indiana. Land use in the surrounding area is predominantly industrial. The underlying aquifer, which is used primarily for non-drinking purposes, is highly susceptible to contamination from surface sources. From 1976 to 1978, the site was used for treatment, storage, and disposal of chemical and bulk liquid wastes. The ROD amends a 1989 ROD that addressed the remaining contaminated soil, pit wastes, and ground water by treatment of an estimated 35,000 cubic yards of soil wastes. The amended remedy reduces the estimated amount of soil to be treated, as a result of new information on arsenic data and amended soil CALs, further defines the site cover requirements, and further defines the requirements for deep well injection of contaminated ground water. The primary contaminants of concern affecting the subsurface soil, sediment, and ground water are VOCs, including methylene chloride, benzene, toluene, TCE, and xylenes; other organics, including PCBs, phenols, and PAHs; and metals, including chromium, and lead. The amended remedial action for the ROD is included

  16. Superfund Record of Decision (EPA region 5): Fultz Landfill, Byesville, OH. (First remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 30-acre Fultz Landfill site is a privately owned inactive sanitary landfill on the north slope of a ridge that overlies abandoned coal mines in Jackson Township, Guernsey County, Ohio. The site lies within the drainage basin of Wills Creek, which flows north adjacent to the site and is used by the city of Cambridge as the municipal water supply. The northern half of the landfill lies in an unreclaimed strip mine where surface mine spoil and natural soil form a shallow aquifer. During the 1970's, the landfill operator was cited for various violations. Investigations in 1988 by EPA indicated that ground water and leachate contaminants emanating from the site have contaminated the shallow aquifer and, to a lesser extent, the deep mine aquifer. The Record of Decision (ROD) addresses all contaminated media, and provides a final remedy for the site. The primary contaminants of concern affecting the soil, sediment, debris, ground water, and surface water are VOCs including benzene, PCE, TCE, toluene, and xylenes; other organics including PAHs and phenols; metals including arsenic, chromium, and lead; and other inorganics. The selected remedial action for this site is included

  17. 200 Areas soil remediation strategy -- Environmental Restoration Program

    International Nuclear Information System (INIS)

    1996-09-01

    The remediation and waste management activities in the 200 Areas of the Hanford Site (located in Richland, Washington) currently range from remediating groundwater, remediating source units (contaminated soils), decontaminating and decommissioning of buildings and structures, maintaining facilities, managing transuranic, low-level and mixed waste, and operating tank farms that store high-level waste. This strategy focuses on the assessment and remediation of soil that resulted from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs, burial grounds) in the 200 Areas and addresses only those waste sites assigned to the Environmental Restoration Program

  18. Department of Energy remedial action program annual conference: Proceedings

    International Nuclear Information System (INIS)

    1990-01-01

    The Office of Environmental Restoration manages a number of programs whose purposes are to complete remedial action at Department of Energy (DOE) facilities and sites located throughout the United States. This volume contains 18 papers on the topics environmental restoration and hazardous/mixed waste characterization and remediation. Individual papers are indexed separately on the Energy Database

  19. Department of Energy Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    Franco, P.J.

    1989-01-01

    This paper discusses the hazardous waste remedial actions program (HAZWRAP) which manages approximately 200 hazardous waste projects. These projects include preliminary assessments, site inspections, and remedial investigation/feasibility studies. The author describes the procedures HAZWRAP follows to ensure quality. The discussion covers the quality assurance aspects of project management, project planning, site characterization, document control and technical teamwork

  20. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1982-12-01

    Progress made during FY 1982, present status, and plans for FY 1983 are described for the following programs: radiological surveys and inclusion of vicinity properties; establishment of cooperative agreements; promulgation of standards for remedial action; acquisition of lands and materials; reprocessing of residual radioactive materials; National Environmental Policy Act (NEPA) documentation; program planning; technology development; remedial action; public participation; other federal agency activities; state and Indian tribe activities; and status of designated sites. Program funding is given

  1. Superfund Record of Decision (EPA Region 9): Nineteenth Avenue Landfill, Phoenix, AZ. (First remedial action), September 1989. Final report

    International Nuclear Information System (INIS)

    1989-01-01

    The 213-acre Nineteenth Avenue Landfill is in an industrial area of Maricopa County, Phoenix, Arizona. State permitted landfill operations were conducted from 1957 to 1979 during which time approximately nine million cubic yards of municipal refuse, solid and liquid industrial wastes, and some medical wastes and materials containing low levels of radioactivity were deposited in the landfill. The State ordered the landfill closed in 1979 due to the periodic inundation of the landfill by flood waters from the Salt River Channel. Subsequently, the city covered the site with fill, stockpiled soil for final capping, installed ground water monitoring wells, built berms around the landfill, and installed a methane gas collection system. The remedial action is designed to mitigate threats resulting from flooding of the landfill, which has occurred intermittently since 1965. The primary contaminants of concern in the soil/refuse include VOCs such as toluene and xylenes

  2. Optimized remedial groundwater extraction using linear programming

    International Nuclear Information System (INIS)

    Quinn, J.J.

    1995-01-01

    Groundwater extraction systems are typically installed to remediate contaminant plumes or prevent further spread of contamination. These systems are expensive to install and maintain. A traditional approach to designing such a wellfield uses a series of trial-and-error simulations to test the effects of various well locations and pump rates. However, the optimal locations and pump rates of extraction wells are difficult to determine when objectives related to the site hydrogeology and potential pumping scheme are considered. This paper describes a case study of an application of linear programming theory to determine optimal well placement and pump rates. The objectives of the pumping scheme were to contain contaminant migration and reduce contaminant concentrations while minimizing the total amount of water pumped and treated. Past site activities at the area under study included disposal of contaminants in pits. Several groundwater plumes have been identified, and others may be present. The area of concern is bordered on three sides by a wetland, which receives a portion of its input budget as groundwater discharge from the pits. Optimization of the containment pumping scheme was intended to meet three goals: (1) prevent discharge of contaminated groundwater to the wetland, (2) minimize the total water pumped and treated (cost benefit), and (3) avoid dewatering of the wetland (cost and ecological benefits). Possible well locations were placed at known source areas. To constrain the problem, the optimization program was instructed to prevent any flow toward the wetland along a user-specified border. In this manner, the optimization routine selects well locations and pump rates so that a groundwater divide is produced along this boundary

  3. Superfund Technology Evaluation Report: SITE Program Demonstration Test Shirco Pilot-Scale Infrared Incineration System at the Rose Township Demode Road Superfund Site Volume I

    Science.gov (United States)

    The Shirco Pilot-Scale Infrared Incineration System was evaluated during a series of seventeen test runs under varied operating conditions at the Demode Road Superfund Site located in Rose Township, Michigan. The tests sought to demonstrate the effectiveness of the unit and the t...

  4. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  5. Compensatory and Remedial Programs: What School Leaders Should Know.

    Science.gov (United States)

    Pellicer, Leonard; Anderson, Lorin

    1993-01-01

    A recent study of state-funded remedial and compensatory programs in South Carolina concluded that about 40% of the state's principals lacked sufficient understanding of such programs to determine which delivery model was most appropriate and to integrate the programs successfully into their schools' total instructional programs. Obviously,…

  6. Environmental compliance at U.S. Department of Energy FUSRAP (Formerly Utilized Sites Remedial Action Program) sites

    International Nuclear Information System (INIS)

    Liedle, S.D.; Clemens, B.W.

    1988-01-01

    With the promulgation of the Superfund Amendments and Reauthorization Act (SARA), federal facilities were required to comply with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) in the same manner as any non-government entity. This presented challenges for the Department of Energy (DOE) and other federal agencies involved in remedial action work because there are many requirements under SARA that overlap other laws requiring DOE compliance, e.g., the National Environmental Policy Act (NEPA). This paper outlines the options developed to comply with CERCLA and NEPA as part of active, multi-site remedial action program. The program, the Formerly Utilized Sites Remedial Action Program (FUSRAP), was developed to identify, clean up, or control sites containing residual radioactive or chemical contamination as a result of the nation's early development of nuclear power. During the Manhattan Project, uranium was extracted from ores and resulted in mill concentrates, purified metals, and waste products that were transported for use or disposal at other locations. Figure 1 shows the steps for producing uranium metal during the Manhattan Project. As a result of these activities materials, equipment, buildings, and land became contaminated, primarily with naturally occurring radionuclides. Currently, FUSRAP includes 29 sites; three are on the Environmental Protection Agency's (EPA's) National Priorities List (NPL) of hazardous waste sites

  7. FUSRAP adapts to the amendments of Superfund

    International Nuclear Information System (INIS)

    Atkin, R.G.; Liedle, S.D.; Clemens, B.W.

    1988-01-01

    With the promulgation of the Superfund Amendments and Reauthorization Act (SARA) federal facilities were required to comply with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) in the same manner as any non-government entity. This situation presented challenges for the Department of Energy (DOE) and other federal agencies involved in remedial action work because of the requirements under SARA that overlap other laws requiring DOE compliance, e.g., the National Environmental Policy Act (NEPA). This paper outlines options developed to comply with CERCLA and NEPA as part of an active, multi-site remedial action program. The program, the Formerly Utilized Sites Remedial Action Program (FUSRAP), was developed to identify, clean up, or control sites containing residual radioactive contamination resulting from the nation's early development of nuclear power. During the Manhattan Project, uranium was extracted from domestic and foreign ores and resulted in mill concentrates, purified metals, and waste products that were transported for use or disposal at other locations. Figure 1 shows the steps for producing uranium metal during the Manhattan Project. As a result of these activities materials equipment, buildings, and land became contaminated, primarily with naturally occurring radionuclides. Currently, FUSRAP includes 29 sites; three are on the Environmental Protection Agency's (EPA's) National Priorities List (NPL) of hazardous waste sites

  8. Department of Energy Hazardous Waste Remedial Actions Program: An overview

    International Nuclear Information System (INIS)

    Eyman, L.D.; Swiger, R.F.

    1988-01-01

    This paper describes the national Department of Energy (DOE) program for managing hazardous waste. An overview of the DOE Hazardous Waste Remedial Actions Program (HAZWRAP), including its mission, organizational structure, and major program elements, is given. The paper focuses on the contractor support role assigned to Martin Marietta Energy Systems, Inc., through the establishment of the HAZWRAP Support Contractor Office (SCO). The major SCO programs are described, and the organization for managing the programs is discussed. The HAZWRAP SCO approaches to waste management planning and to technology research, development, and demonstration are presented. The role of the SCO in the DOE Environmental Restoration Program and the development of the DOE Waste Information network are reviewed. Also discussed is the DOE Work for Others Program, where waste management decentralized support, via interagency agreements between DOE and the Department of Defense and DOE and the Environmental Protection Agency, is provided for those sponsors planning remedial response actions. 2 refs

  9. 75 FR 49414 - Cooperative Agreements and Superfund State Contracts for Superfund Response Actions

    Science.gov (United States)

    2010-08-13

    ...-0276. FOR FURTHER INFORMATION CONTACT: Angelo Carasea, Assessment and Remediation Division, Office of Superfund Remediation and Technology Innovation, (5204P), Environmental Protection Agency, 1200 Pennsylvania... funds to a State, political subdivision, or Indian Tribe that assumes responsibility as the lead or...

  10. EM-54 Technology Development In Situ Remediation Integrated Program

    International Nuclear Information System (INIS)

    1993-08-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) as an element of Environmental Restoration and Waste Management (EM) in November 1989. EM manages remediation of all DOE sites as well as wastes from current operations. The goal of the EM program is to minimize risks to human health, safety and the environment, and to bring all DOE sites into compliance with Federal, state, and local regulations by 2019. EM-50 is charged with developing new technologies that are safer, more effective and less expensive than current methods. The In Situ Remediation Integrated Program (the subject of this report) is part of EM-541, the Environmental Restoration Research and Development Division of EM-54. The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: Significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces; in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP tends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years

  11. Hazardous Waste Remedial Actions Program: integrating waste management

    International Nuclear Information System (INIS)

    Petty, J.L.; Sharples, F.E.

    1986-01-01

    The Hazardous Waste Remedial Actions Program was established to integrate Defense Programs' activities in hazardous and mixed waste management. The Program currently provides centralized planning and technical support to the Office of the Assistant Secretary for Defense Programs. More direct project management responsibilities may be assumed in the future. The Program, under the direction of the ASDP's Office of Defense Waste and Transportation Management, interacts with numerous organizational entities of the Department. The Oak Ridge Operations Office has been designated as the Lead Field Office. The Program's four current components cover remedial action project identification and prioritization; technology adaptation; an informative system; and a strategy study for long-term, ''corporate'' project and facility planning

  12. Strategy to Ensure Institutional Control Implementation at Superfund Sites

    Science.gov (United States)

    This document sets forth EPA’s strategy (Strategy) for ensuring that institutional controls (ICs) are successfully implemented at Superfund sites, with an emphasis on evaluating ICs at sites where all construction of all remedies is complete (construction complete sites).

  13. Development of a remediation program for Egyptian dyslexic children

    African Journals Online (AJOL)

    Objectives: The present study was designed to formulate a remediation program for Arabic speaking children suffering from dyslexia based on improving phonological awareness using materials appropriate for Arabic culture. Methods: The study was carried out at the unit of Phoniatrics, Faculty of Medicine, Alexandria main ...

  14. Developing Sediment Remediation Goals at Superfund Sites Based on Pore Water for the Protection of Benthic Organisms from Direct Toxicity to Non-ionic Organic Contaminants

    Science.gov (United States)

    A methodology for developing remediation goals for sites with contaminated sediments is provided. The remediation goals are based upon the concentrations of chemicals in the sediment interstitial water measured using the passive sampling technique. The passive sampling technique ...

  15. Duct Remediation Program: Engineered access research and construction

    International Nuclear Information System (INIS)

    Beckman, T.D.; Davis, M.M.; Karas, T.M.

    1992-01-01

    The Rocky Flats Plant, Duct Remediation mission concentrated on removing Plutonium Oxide from the process ductwork in the primary Plutonium processing facility. When possible, remediation took place from existing process gloveboxes. Fifteen locations were identified, however, that required accessing duct runs where no process gloveboxes existed. The building's second floor utility areas had many locations where long, inaccessible duct runs were prevalent. Consequently, an extensive program for design, procurement and construction was initiated to contain and isolate ducts for penetration when existing glovebox sites were not present

  16. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  17. Ensuring the adequacy of cost share provisions in superfund state contracts. Directive

    International Nuclear Information System (INIS)

    1993-01-01

    The memorandum requests regional offices to re-examine existing Superfund State Contracts (SSCs) for Fund-financed remedial actions to verify that they adequately reflect incurred and projected remedial action costs

  18. Department of Energy hazardous waste remedial actions program: Quality assurance program

    International Nuclear Information System (INIS)

    Horne, T.E.

    1988-01-01

    This paper describes the Quality Assurance Program developed for the Hazardous Waste Remedial Actions Program Support Contractor Office (HAZWRAP SCO). Key topics discussed include an overview of the HAZWRAP SCO mission and organization, the basic quality assurance program requirements and the requirements for the control of quality for the Department of Energy and Work for Others hazardous waste management programs, and the role of ensuring quality through the project team concept for the management of remedial response actions. The paper focuses on planning for quality assurance for this remedial waste management process from preliminary assessments of remedial sites to feasibility studies. Some observations concerning the control of quality during the implementation of remedial actions are presented. (2 refs.)

  19. Feasibility study for the United Heckathorn Superfund Site, Richmond, California

    Energy Technology Data Exchange (ETDEWEB)

    Lincoff, A.H. [US Environmental Protection Agency, San Francisco, CA (United States). Region IX; Costan, G.P.; Montgomery, M.S.; White, P.J. [Pacific Northwest Lab., Richland, WA (United States)

    1994-07-01

    The United Heckathom Superfund Site in Richmond, California, was used to formulate pesticides from approximately 1947 to 1966. Soils at the site and sediments in the harbor were contaminated with various chlorinated pesticides, primarily DDT, as a result of these activities. The US Environmental Protection Agency listed the site on the Superfund National Priorities List in 1990. This document is part of the Remedial Investigation and Feasibility Study phase of the Superfund response, which will provide the basis for selection of a final remedy that will protect human health and the environment and achieve compliance with federal and state envirorunental laws.

  20. Feasibility study for the United Heckathorn Superfund Site, Richmond, California

    International Nuclear Information System (INIS)

    Lincoff, A.H.

    1994-07-01

    The United Heckathom Superfund Site in Richmond, California, was used to formulate pesticides from approximately 1947 to 1966. Soils at the site and sediments in the harbor were contaminated with various chlorinated pesticides, primarily DDT, as a result of these activities. The US Environmental Protection Agency listed the site on the Superfund National Priorities List in 1990. This document is part of the Remedial Investigation and Feasibility Study phase of the Superfund response, which will provide the basis for selection of a final remedy that will protect human health and the environment and achieve compliance with federal and state envirorunental laws

  1. Tank waste remediation system environmental program plan

    Energy Technology Data Exchange (ETDEWEB)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  2. Tank waste remediation system environmental program plan

    International Nuclear Information System (INIS)

    Borneman, L.E.

    1998-01-01

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996)

  3. Hazardous Waste Remedial Actions Program annual progress report, FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    The Hazardous Waste Remedial Actions Programs (HAZWRAP), a unit of Martin Marietta Energy Systems, Inc., supports the Department of Energy (DOE) Oak Ridge Operations Office in broadly environmental areas, especially those relating to waste management and environmental restoration. HAZWRAP comprises six program areas, which are supported by central administrative and technical organizations. Existing programs deal with airborne hazardous substances, pollution prevention, remedial actions planning, environmental restoration, technology development, and information and data systems. HAZWRAP's mission to develop, promote, and apply-cost-effective hazardous waste management and environmental technologies to help solve national problems and concerns. HAZWRAP seeks to serve as integrator for hazardous waste and materials management across the federal government. It applies the unique combination of research and development (R D) capabilities, technologies, management expertise, and facilities in the Energy Systems complex to address problems of national importance. 24 figs., 10 tabs.

  4. Current activities handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-27

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

  5. Expedited Remedial Action Program (SB 923): A California Brownfields initiative

    Energy Technology Data Exchange (ETDEWEB)

    Cambridge, M.; Wolfenden, A.K.

    1996-12-31

    California`s Expedited Remedial Action Program (ERAP) created a comprehensive program that promotes an equitable and expedited approach for redevelopment of properties contaminated with hazardous substances. This bill embodies an emerging trend in environmental policy that permits flexibility, cooperation and creativity without compromising protection to public health or the environment. Within the California Environmental Protection Agency, the Department of Toxic Substances Control (DTSC) is promoting a number of programs to facilitate the restoration of contaminated properties as part of its Brownfields initiative. ERAP represents a potentially more efficient process to remediate sites by minimizing economic risks through a clearly identified liability scheme, indemnifying future owners through a covenant not to sue, and providing risk based cleanups that are based on the permanent use of the site.

  6. Current activities handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified

  7. Description of the Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed

  8. Description of the Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

  9. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste

  10. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  11. New Jersey's residential radon remediation program - methods and experience

    International Nuclear Information System (INIS)

    Pluta, T.A.; Cosolita, F.J.; Rothfuss, E.

    1986-01-01

    As part of a remedial action program to decontaminate over 200 residential properties, 12 typical properties were selected and a demonstration program was initiated in the spring of 1985. The residences selected represented a range of contamination levels and configurations and differing architectural styles representative of the age of construction. The physical limitations of the sites and the overall nature of a decontamination project in active residential communities imposed a number of severe restrictions on work methods and equipment. Regulations governing transportation and disposal set virtually zero defect standards for the condition of containers. The intrusive nature of the work in residential neighborhoods required continual interaction with local residents, public officials and citizen task forces. Media coverage was very high. Numerous briefings were held to allay fears and promote public understanding. Numerous issues ranging in content from public health and safety to engineering and construction methods arose during the remedial action program. These issues were resolved by a multi-disciplined management team which was knowledgeable in public administration, radiation physics, and engineering design and construction. This paper discusses the nature of the problem, the methods applied to resolve the problem and the experience gained as a result of a remedial action program

  12. Biota Modeling in EPA's Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

    Energy Technology Data Exchange (ETDEWEB)

    Manning, Karessa L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dolislager, Fredrick G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bellamy, Michael B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-11-01

    The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level tools that set forth Environmental Protection Agency's (EPA) recommended approaches, based upon currently available information with respect to risk assessment, for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has a residential gardening scenario and subsistence farmer exposure scenarios that require modeling of the transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC exposure scenarios. Recent improvements have been made in the biota modeling for these calculators, including newly derived biota intake rates, more comprehensive soil mass loading factors (MLFs), and more comprehensive soil to tissue transfer factors (TFs) for animals and soil to plant transfer factors (BV's). New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

  13. Biota Modeling in EPA's Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

    International Nuclear Information System (INIS)

    Manning, Karessa L.; Dolislager, Fredrick G.; Bellamy, Michael B.

    2016-01-01

    The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level tools that set forth Environmental Protection Agency's (EPA) recommended approaches, based upon currently available information with respect to risk assessment, for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has a residential gardening scenario and subsistence farmer exposure scenarios that require modeling of the transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC exposure scenarios. Recent improvements have been made in the biota modeling for these calculators, including newly derived biota intake rates, more comprehensive soil mass loading factors (MLFs), and more comprehensive soil to tissue transfer factors (TFs) for animals and soil to plant transfer factors (BV's). New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

  14. Tank waste remediation system nuclear criticality safety program management review

    International Nuclear Information System (INIS)

    BRADY RAAP, M.C.

    1999-01-01

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999

  15. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    International Nuclear Information System (INIS)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, and eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs

  16. Uranium Mill Tailings Remedial Action Project Vicinity Property Program

    International Nuclear Information System (INIS)

    Little, L.E.; Potter, R.F.; Arpke, P.W.

    1988-01-01

    The Department of Energy Uranium Mill Tailings Remedial Action (UMTRA) Grand Junction Project Vicinity Property Program is a $165 million program for the removal and disposal of uranium mill tailings that were used in the construction of approximately 4,000 residences, commercial buildings, and institutional facilities in the City of Grand Junction and surrounding Mesa County, Colorado. This paper discusses the UMTRA Vicinity Property Program and the economic benefits of this program for the City of Grand Junction and Mesa County, Colorado. The Bureau of Reclamation Economic Assessment Model (BREAM) was used to estimate the increases in employment and increases in personal income in Mesa County that result from the Vicinity Property Program. The effects of program-related changes in income and taxable expenditures on local and state tax revenue are also presented

  17. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  18. Treatability Study of In Situ Technologies for Remediation of Hexavalent Chromium in Groundwater at the Puchack Well Field Superfund Site, New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    Vermeul, Vince R.; Szecsody, Jim E.; Truex, Michael J.; Burns, Carolyn A.; Girvin, Donald C.; Phillips, Jerry L.; Devary, Brooks J.; Fischer, Ashley E.; Li, Shu-Mei W.

    2006-11-13

    This treatability study was conducted by Pacific Northwest National Laboratory (PNNL), at the request of the U. S. Environmental Protection Agency (EPA) Region 2, to evaluate the feasibility of using in situ treatment technologies for chromate reduction and immobilization at the Puchack Well Field Superfund Site in Pennsauken Township, New Jersey. In addition to in situ reductive treatments, which included the evaluation of both abiotic and biotic reduction of Puchack aquifer sediments, natural attenuation mechanisms were evaluated (i.e., chromate adsorption and reduction). Chromate exhibited typical anionic adsorption behavior, with greater adsorption at lower pH, at lower chromate concentration, and at lower concentrations of other competing anions. In particular, sulfate (at 50 mg/L) suppressed chromate adsorption by up to 50%. Chromate adsorption was not influenced by inorganic colloids.

  19. In situ remediation integrated program: Success through teamwork

    International Nuclear Information System (INIS)

    Peterson, M.E.

    1994-08-01

    The In Situ Remediation Integrated Program (ISR IP), managed under the US Department of Energy's (DOE) Office of Technology Development, focuses research and development efforts on the in-place treatment of contaminated environmental media, such as soil and groundwater, and the containment of contaminants to prevent the contaminants from spreading through the environment. As described here, specific ISR IP projects are advancing the application of in situ technologies to the demonstration point, providing developed technologies to customers within DOE. The ISR IP has also taken a lead role in assessing and supporting innovative technologies that may have application to DOE

  20. Risk assessment in the DOE Assurance Program for Remedial Action

    International Nuclear Information System (INIS)

    Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

    1985-08-01

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly

  1. Cleanups In My Community (CIMC) - Superfund National Priority List (NPL) Sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Superfund National Priority List Sites as part of the CIMC web service. Superfund is a program administered by the EPA to locate,...

  2. Measurement and monitoring technologies are important SITE program component

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    An ongoing component of the Superfund Innovative Technologies Evaluation (SITE) Program, managed by the US EPA at its Hazardous Waste Engineering Research Laboratory in Cincinnati, is the development and demonstration of new and innovative measurement and monitoring technologies that will be applicable to Superfund site characterization. There are four important roles for monitoring and measurement technologies at Superfund sites: (1) to assess the extent of contamination at a site, (2) to supply data and information to determine impacts to human health and the environment, (3) to supply data to select the appropriate remedial action, and (4) to monitor the success or effectiveness of the selected remedy. The Environmental Monitoring Systems Laboratory in Las Vegas, Nevada (EMSL-LV) has been supporting the development of improved measurement and monitoring techniques in conjunction with the SITE Program with a focus on two areas: Immunoassay for toxic substances and fiber optic sensing for in-situ analysis at Superfund sites

  3. Missouri state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and rgulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations

  4. Missouri State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations

  5. Missouri State information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  6. Review of the Vortec soil remediation demonstration program

    International Nuclear Information System (INIS)

    Patten, J.S.

    1994-01-01

    The principal objective of the METC/Vortec program is to develop and demonstrate the effectiveness of the Vortec CMS in remediating soils contaminated with hazardous materials and/or low levels of radionuclides. To convincingly demonstrate the CMS's capability, a Demonstration Plant will be constructed and operated at a DOE site that has a need for the remediation of contamination soil. The following objectives will be met during the program: (1) establish the glass chemistry requirements to achieve vitrification of contaminated soils found at the selected DOE site; (2) complete the design of a fully integrated soil vitrification demonstration plant with a capacity to process 25 TPD of soil; (3) establish the cost of a fully integrated soil demonstration plant with a capacity to process 25 TPD of soil; (4) construct and operate a fully integrated demonstration plant; (5) analyze all influent and effluent streams to establish the partitioning of contaminants and to demonstrate compliance with all applicable health, safety, and environmental requirements; (6) demonstrate that the CMS technology has the capability to produce a vitrified product that will immobilize the hazardous and radionuclide materials consistent with the needs of the specific DOE waste repositories

  7. Illinois state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Illinois. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  8. Illinois State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Illinois. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  9. Massachusetts state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  10. Iowa state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations

  11. Maryland State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  12. Pennsylvania state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  13. Massachusetts state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  14. California state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  15. Iowa state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  16. California state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  17. Pennsylvania state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  18. Oregon state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  19. Maryland State information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  20. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    Energy Technology Data Exchange (ETDEWEB)

    Levine, M.B.; Sigmon, C.F.

    1989-09-29

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges.

  1. Florida state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  2. Pennsylvania state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  3. Oregon state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  4. Oregon state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  5. Maryland state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  6. Florida state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-27

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  7. Ohio state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Ohio. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations

  8. Ohio state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Ohio. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  9. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    International Nuclear Information System (INIS)

    Levine, M.B.; Sigmon, C.F.

    1989-01-01

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges

  10. Oregon state information handbook formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  11. Superfund Record of Decision (EPA Region 4): Maxey Flats Nuclear Disposal site, Fleming County, KY. (First remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 280-acre Maxey Flats Nuclear Disposal site is an inactive low-level radioactive waste disposal facility in Fleming County, Kentucky. The estimated 663 people who reside within 2.5 miles of the site use the public water supply for drinking purposes. From 1962 to 1977, Nuclear Engineering Company, Inc. (NECO), operated a solid by-product, source, and special nuclear material disposal facility under a license with the State. Several State investigations in the 1970's revealed that leachate contaminated with tritium and other radioactive substances was migrating from the disposal trenches to unrestricted areas. The Record of Decision (ROD) addresses final remediation of soil, debris, and associated leachate. The primary contaminants of concern affecting the soil and debris are VOCs including benzene, TCE, and toluene; metals including arsenic and lead; and radioactive materials. The selected remedial action for the site is included

  12. Superfund record of decision (EPA Region 4): Whitehouse Waste Oil Pits Site, Duval County, Jacksonville, FL. (First remedial action), (Amendment), June 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 7-acre Whitehouse Waste Oil Pits site was used by Allied Petroleum Products (Allied) to dispose of acidic waste oil sludges from its oil reclamation process in Whitehouse, Duval County, Florida. A cypress swamp system and residential area are immediately adjacent to the site. The acid sludge produced in the first step and clay used to decolorize the oil were dumped into the unlined pits at the site. A 1985 ROD addressed source control as a containment remedy consisting of a slurry wall construction, soil cap, and a ground water recovery and treatment system; however, EPA has re-evaluated the 1985 ROD selection and determined that the containment remedy failed to meet the requirements of SARA. As a result, the ROD Amendment focuses on an alternative for treating Whitehouse wastes by eliminating direct contact risk associated with pit soil/sludge wastes and preventing contaminated ground water in the surficial aquifer from migrating laterally. The primary contaminants of concern that affect the soil, sediment, surface water, and ground water are VOCs, including benzene, toluene, and xylenes; organics, including PCBs and phenols; and metals, including arsenic, chromium, and lead. The amended remedial action for the site are included

  13. Superfund Record of Decision (EPA Region 2): Woodland Township Route 72 site, Burlington County, New Jersey (first remedial action), May 16, 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The 12-acre Woodland Route 72 Dump site is an abandoned hazardous waste dump in Woodland Township, Burlington County, New Jersey. The site is being remediated concurrently with another abandoned dump. Several chemical manufacturing firms dumped chemicals and other wastes into trenches and lagoons or burned the waste at the sites from the early 1950s to 1962. The primary contaminants of concern affecting the surface soil, sediment, sludge, debris, and ground water are VOCs including benzene, toluene, TCE and xylenes; organics including PAHs, pesticides, and phenols; radionuclides (e.g., uranium and thorium series); and metals including lead and chromium. The selected remedial action for the site includes excavation, further characterization, and offsite disposal at a permitted facility of 54,000 cubic yards (total from both sites) of contaminated surface soil, sludges, debris and sediment; offsite disposal of 19 cubic yards (total from both sites) of radiologically contaminated surface materials including a drum of radioactive pellets; ground water pumping and treatment with treatment to be determined during design. The total estimated present worth cost for the concurrent remedial actions at the Route 72 and Route 532 sites is $142,200,000

  14. Superfund TIO videos: Set B. Financial management and SCAP. Part 8. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape covers various aspects of financial management for the Superfund Program. The importance of effective financial management and execution is discussed. The objectives and definitions of the Superfund Comprehensive Accomplishment Plan (SCAP) and the roles and responsibilities of Superfund personnel in the SCAP process are covered

  15. Superfund Record of Decision (EPA Region 7): Weldon Spring Quarry/Plant/Pits (USDOE), Weldon Spring, MO. (Second remedial action), September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The 226-acre Weldon Spring Quarry/Plant/Pits (USDOE) site is a former ordnance works and chemical plant near the city of Weldon Spring in St. Charles County, Missouri. The site is divided into two noncontiguous areas: a 217-acre chemical plant area, comprised of various buildings, ponds and four raffinate pits, and a 9-acre quarry, which forms a valley wall at the edge of the Missouri River floodplain. Since the early 1940s, the site has been used by various government agencies for chemical and ordnance processing with chemical and radioactive waste disposal in the quarry. From 1941 to 1946, the site was an Army ordnance works used for the production of trinitrotoluene (TNT) and dinitrotoluene (DNT) explosives. The selected interim remedial action for the site includes excavating an estimated 95,000 cubic yards of chemically and radioactively contaminated bulk wastes from the quarry and temporarily storing the wastes onsite in the chemical plant area; and implementing site access restrictions. The estimated total cost for the remedial action is $11,000,000

  16. Superfund Record of Decision (EPA Region 9): North Hollywood/Burbank Well Field Area 1, San Fernando Valley Site, California (first remedial action), September 1987. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-24

    The North Hollywood - Burbank Well Field (NHBWF) is located within the San Fernando Valley Ground Water basin, which can provide drinking water for approximately 500,000 people residing in the San Fernando Valley and Los Angeles. In 1980 TCE and PCE were discovered in 25% of DWP's wells. In July 1981, DWP and the Southern California Association of Governments began a two-year study funded by EPA. The study revealed the occurrence of ground-water contamination plume patterns that are spreading toward the southeast. The primary contaminant of concern to the ground-water is TCE with PCE and other VOCs present. The selected remedial action for the site is ground-water pump and treatment using aeration and granular-activated-carbon - air-filtering units, with discharge to the DWP Pumping Station for chlorination and distribution. Spent carbon will be removed and replaced with fresh carbon, with the spent carbon scheduled either for disposal or regeneration. The estimated capital cost for this remedial action is $2,192,895 with present worth OandM of $2,284,105.

  17. Superfund Record of Decision (EPA Region 6): United Nuclear Corporation, Mckinley County, New Mexico, ground-water operable unit (first remedial action) September 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The United Nuclear Corporation (UNC) site is located approximately 17 miles northeast of Gallup, New Mexico in McKinley County. The site operated as a State-licensed uranium mill facility from June 1977 to May 1982. It includes an ore-processing mill (about 25 acres) and an unlined tailings pond area (about 100 acres). In July 1979, approximately 23 million gallons of tailings and pond water were released to a nearby river as a result of a dam breach in the tailings pond area. The site damage was repaired; however, attention was focused on ground-water contamination resulting from tailings seepage. Nevertheless, the offsite migration of radionuclides and chemical constituents from uranium milling byproduct materials into the ground water, as well as to surface water and air, are still principal threats at the site. The remedial action will address onsite ground water contamination. Source control and onsite surface reclamation will be implemented under the direction of the Nuclear Regulatory Commission and integrated with this ground water operable unit. The primary contaminants of concern affecting the ground water are metals including arsenic, and radioactive substances including radium-226/228 and gross alpha. The selected remedial action for the site is included

  18. Superfund record of decision (EPA Region 4): Ciba-Geigy Site (McIntosh Plant), Washington County, McIntosh, AL. (Third remedial action), July 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 1,500-acre Ciba-Geigy site is an active chemical manufacturer in an industrial area in McIntosh, Washington County, Alabama. A wetlands area borders the site property, and part of the site lies within the floodplain of the Tombigbee River. In 1985, EPA issued a RCRA permit that included a corrective action plan requiring Ciba-Geigy to remove and treat ground water and surface water contamination at the site. Further investigations by EPA revealed 11 former waste management areas of potential contamination onsite. These areas contain a variety of waste, debris, pesticide by-products and residues. The ROD addresses a final remedy for OU4, which includes contaminated soil and sludge in former waste management Area 8 and the upper dilute ditch. The primary contaminants of concern affecting the soil, sludge, and debris are VOCs, including benzene, toluene, and xylenes; other organics, including pesticides; metals, including arsenic, chromium, and lead; and inorganics, including cyanide. The selected remedial action for the site are included

  19. Superfund Record of Decision (EPA Region 5): Buckeye Reclamation Landfill Site, Belmont County, OH. (First remedial action), August 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 658-acre Buckeye Reclamation site contains a 50-acre former landfill in Richland Township, Belmont County, Ohio. Land use in the area is predominantly agricultural, rural residential, and strip mining. A total of 46 domestic wells and springs are located within 1 mile of the site. The original topography of the valley has been altered by coal mining and landfill operations. Solid industrial wastes also were disposed of with municipal wastes elsewhere in the landfill. In 1980, the Waste Pit was filled with sludge, mine spoil, and overburden soil; covered with soil and garbage; and seeded. Results of the RI indicate various levels of contamination in all media sampled, except air. The Record of Decision (ROD) addresses the remediation of contaminated leachate and ground water and eliminates exposure to contaminated surface soil. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, TCE, and toluene; other organics including PAHs; and metals including arsenic, chromium, beryllium, and lead. The selected remedial action for the site is included

  20. Federal government information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains: a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant Federal statutes and regulations

  1. Federal government information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations

  2. Federal government information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  3. Superfund XV conference proceedings. Volume 1

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This conference was held November 29--December 1, 1994 in Washington, D.C..The purpose of this conference was to provide a forum for exchange of state-of-the-art information on Superfund. Papers are included on the following topics: bioremediation; building decontamination; environmental policy issues; federal environmental restoration; groundwater remediation; innovative sampling and analytical technologies; laboratory methods; metals management; mixed wastes; PCB waste management; remediation technology and case studies; and risk assessment. Individual papers have been processed separately for inclusion in the appropriate data bases

  4. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  5. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    International Nuclear Information System (INIS)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE's overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program

  6. Environmental Remediation Sciences Program at the Stanford Synchrotron Radiation Laboratory

    International Nuclear Information System (INIS)

    Bargar, John R.

    2006-01-01

    Synchrotron radiation (SR)-based techniques provide unique capabilities to address scientific issues underpinning environmental remediation science and have emerged as major research tools in this field. The high intensity of SR sources and x-ray photon-in/photon-out detection allow noninvasive in-situ analysis of dilute, hydrated, and chemically/structurally complex natural samples. SR x-rays can be focused to beams of micron and sub-micron dimension, which allows the study of microstructures, chemical microgradients, and microenvironments such as in biofilms, pore spaces, and around plant roots, that may control the transformation of contaminants in the environment. The utilization of SR techniques in environmental remediation sciences is often frustrated, however, by an ''activation energy barrier'', which is associated with the need to become familiar with an array of data acquisition and analysis techniques, a new technical vocabulary, beam lines, experimental instrumentation, and user facility administrative procedures. Many investigators find it challenging to become sufficiently expert in all of these areas or to maintain their training as techniques evolve. Another challenge is the dearth of facilities for hard x-ray micro-spectroscopy, particularly in the 15 to 23 KeV range, which includes x-ray absorption edges of the priority DOE contaminants Sr, U, Np, Pu, and Tc. Prior to the current program, there were only two (heavily oversubscribed) microprobe facilities in the U.S. that could fully address this energy range (one at each of APS and NSLS); none existed in the Western U.S., in spite of the relatively large number of DOE laboratories in this region

  7. Superfund Record of Decision (EPA Region 3): Southern Maryland Wood Treating Site, Hollywood, Maryland (first remedial action) June 1988. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1988-06-29

    The Southern Maryland Wood Treating (SMWT) site is located in Hollywood, St. Mary's County, Maryland. The site is situated within a wetland area in a drainage divide such that runoff from the site discharges into Brooks Run and McIntosh Run tributaries, which flow into the Potomac River. The area surrounding the site is predominantly used for agricultural and residential purposes. Currently, part of the site is being used as a retail outlet for pretreated lumber and crab traps. The waste generated at the site included retort and cylinder sludges, process wastes, and material spillage. These wastes were in six onsite unlined lagoons. The primary contaminants of concern affecting the onsite ground water, soil, surface water, sediments, and debris include: VOCs, PNA, and base/neutral acid extractables. The selected remedial action for the site is included.

  8. Superfund record of decision (EPA Region 4): Potter's septic tank service pits site, Brunswick County, Sandy Creek, NC. (First remedial action), August 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 5-acre Potter's Septic Tank Service Pits (Potter's Pits) is located in a rural section of Brunswick County, North Carolina. The site is situated within a residential community known as the Town of Sandy Creek. Disposal practices consisted of placing petroleum waste products and septic tank sludges either in shallow unlined pits or directly on the land surface. The ROD addresses the ground water treatment and contaminated soils at the site. Primary contaminants of concern affecting surface and subsurface soil are VOCs and semi-VOCs, including napthalene, metals, and pesticides. Ground water is contaminated with VOCs, including benzene, ethyl benzene, toluene; other organics including naphthalene, and xylenes; and metals, including chromium and lead. The selected remedial action for the site includes excavating all soils that exceed the soil clean-up standards; treating contaminated soils by using an onsite ex-situ thermal desorption process; performing secondary treatment of the concentrated organic contaminants, and sampling and analyzing the treatment residue

  9. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1983-12-01

    The FY 1983 project accomplishments are: completed the Remedial Action Plan and Phase I engineering design for the Canonsburg processing site; completed remedial action on an additional 52 vicinity properties and the inclusion of an additional 303 properties in the Uranium Mill Tailings Remedial Action Project; executed cooperative agreements with four states and the Navajo Nation; published the draft environmental impact statement for Salt Lake City site; and issued the approved Project Plan

  10. What does remediation and probation status mean? A survey of emergency medicine residency program directors.

    Science.gov (United States)

    Weizberg, Moshe; Smith, Jessica L; Murano, Tiffany; Silverberg, Mark; Santen, Sally A

    2015-01-01

    Emergency medicine (EM) residency program directors (PDs) nationwide place residents on remediation and probation. However, the Accreditation Council for Graduate Medical Education and the EM PDs have not defined these terms, and individual institutions must set guidelines defining a change in resident status from good standing to remediation or probation. The primary objective of this study was to determine if EM PDs follow a common process to guide actions when residents are placed on remediation and probation. An anonymous electronic survey was distributed to EM PDs via e-mail using SurveyMonkey to determine the current practice followed after residents are placed on remediation or probation. The survey queried four designations: informal remediation, formal remediation, informal probation, and formal probation. These designations were compared for deficits in the domains of medical knowledge (MK) and non-MK remediation. The survey asked what process for designation exists and what actions are triggered, specifically if documentation is placed in a resident's file, if the graduate medical education (GME) office is notified, if faculty are informed, or if resident privileges are limited. Descriptive data are reported. Eighty-one of 160 PDs responded. An official policy on remediation and/or probation was reported by 41 (50.6%) programs. The status of informal remediation is used by 73 (90.1%), 80 (98.8%) have formal remediation, 40 (49.4%) have informal probation, and 79 (97.5%) have formal probation. There was great variation among PDs in the management and definition of remediation and probation. Between 81 and 86% of programs place an official letter into the resident's file regarding formal remediation and probation. However, only about 50% notify the GME office when a resident is placed on formal remediation. There were no statistical differences between MK and non-MK remediation practices. There is significant variation among EM programs regarding the

  11. Stochastic goal programming based groundwater remediation management under human-health-risk uncertainty

    International Nuclear Information System (INIS)

    Li, Jing; He, Li; Lu, Hongwei; Fan, Xing

    2014-01-01

    Highlights: • We propose an integrated optimal groundwater remediation design approach. • The approach can address stochasticity in carcinogenic risks. • Goal programming is used to make the system approaching to ideal operation and remediation effects. • The uncertainty in slope factor is evaluated under different confidence levels. • Optimal strategies are obtained to support remediation design under uncertainty. - Abstract: An optimal design approach for groundwater remediation is developed through incorporating numerical simulation, health risk assessment, uncertainty analysis and nonlinear optimization within a general framework. Stochastic analysis and goal programming are introduced into the framework to handle uncertainties in real-world groundwater remediation systems. Carcinogenic risks associated with remediation actions are further evaluated at four confidence levels. The differences between ideal and predicted constraints are minimized by goal programming. The approach is then applied to a contaminated site in western Canada for creating a set of optimal remediation strategies. Results from the case study indicate that factors including environmental standards, health risks and technical requirements mutually affected and restricted themselves. Stochastic uncertainty existed in the entire process of remediation optimization, which should to be taken into consideration in groundwater remediation design

  12. Superfund Record of Decision (EPA Region 8): Denver Radium/Card Corporation Property, Colorado (third remedial action), June 1987. Final report

    International Nuclear Information System (INIS)

    1987-01-01

    The Denver Radium/Card Corporation property is a 17.2-acre site located in Denver, Colorado. In 1979, the EPA discovered a reference to the National Radium Institute in 1916 U.S. Bureau of Mines report. Subsequent field research revealed the presence of thirty-one radioactive sites in the Denver Metropolitan area, one of these being Card property, the location of the original Pittsburgh Radium Company processing facility. The site consists of five buildings and an oil and waste water pond at the eastern boundary. There is no serious public health risk at present from radium or its decay products, most notable radion gas. However, there is the potential for increased public health risk if the radium contaminated materials are misused or inadvertently spread. Currently, radium has been detected in the soil, sediment, and underneath the True Truss building. EPA's preferred remedial action for the Card property is permanent offsite disposal. However, the alternative can not be implemented until a suitable offsite facility is designated

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  14. Superfund Site Information

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes a number of individual data sets related to site-specific information for Superfund, which is governed under the Comprehensive Environmental...

  15. Uranium Mill Tailings Remedial Action Program. Annual status report

    Energy Technology Data Exchange (ETDEWEB)

    1980-12-01

    The purpose, scope, history, requirements, and management organization of the UMTRA Program are summarized in the Introduction. The remainder of the report describes progress made during the past year (F 1980) and discusses future plants and activities. Early emphasis has been on the four highest-priority sites because of their proximity to population centers. These sites are: (1) Canonsburg, Pennsylvania; (2) Salt Lake City, Utah; (3) Durango, Colorado; and (4) Shiprock, New Mexico (Navajo Reservation). To date, twenty-five vicinity properties near the Canonsburg site and two such properties near the Salt Lake City site have been designated for remedial action. A research effort was undertaken at a major vicinity property, the Mountain States Supply Company in Salt Lake City, to study the effects of heating-and-ventilating-system modification on indoor radon-daughter concentrations. A cooperative agreement was executed between DOE and the Commonwealth of Pennsylvania. A similar agreement with the State of Utah is expected to be executed in early FY 1981. Further, it is expected that additional cooperative agreements will be negotiated during FY 1981 with the States of Colorado and Wyoming and the Navajo Nation. It is expected that the processing site at Canonsburg, PA (the Canonsburg Industrial Park) will be acquired during FY 1981. Draft Environmental Impact Statements for the four highest-priority sites will be completed during FY 1981.

  16. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1980-12-01

    The purpose, scope, history, requirements, and management organization of the UMTRA Program are summarized in the Introduction. The remainder of the report describes progress made during the past year (F 1980) and discusses future plants and activities. Early emphasis has been on the four highest-priority sites because of their proximity to population centers. These sites are: (1) Canonsburg, Pennsylvania; (2) Salt Lake City, Utah; (3) Durango, Colorado; and (4) Shiprock, New Mexico (Navajo Reservation). To date, twenty-five vicinity properties near the Canonsburg site and two such properties near the Salt Lake City site have been designated for remedial action. A research effort was undertaken at a major vicinity property, the Mountain States Supply Company in Salt Lake City, to study the effects of heating-and-ventilating-system modification on indoor radon-daughter concentrations. A cooperative agreement was executed between DOE and the Commonwealth of Pennsylvania. A similar agreement with the State of Utah is expected to be executed in early FY 1981. Further, it is expected that additional cooperative agreements will be negotiated during FY 1981 with the States of Colorado and Wyoming and the Navajo Nation. It is expected that the processing site at Canonsburg, PA (the Canonsburg Industrial Park) will be acquired during FY 1981. Draft Environmental Impact Statements for the four highest-priority sites will be completed during FY 1981

  17. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    International Nuclear Information System (INIS)

    ROOT, R.W.

    1999-01-01

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems

  18. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1984-12-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project FY 1984 major accomplishments are summarized. Twenty-five percent of the processing site remedial actions at Canonsburg, PA, were completed. Remedial action on 118 vicinity properties at four designated locations were initiated and survey and inclusion activities on a total of 420 vicinity properties were completed. The Environmental Impact Statement (EIS) for Salt Lake City, UT, and the Environmental Assessment (EA) for Shiprock, NM were published, and the preliminary draft EIS for Durango, CO, was prepared. Remedial Action Plans (RAPs) for Salt Lake City, UT, and Shiprock, NM were completed, and draft RAPs for Gunnison, CO, and Riverton, WY were prepared. Cooperative agreements with Oregon, Wyoming, and South Dakota were executed, and the Utah cooperative agreement was modified to assign the construction management responsibility to the state. An Interagency Agreement with TVA for disposal of the Edgemont vicinity property material was executed

  19. Inactive Tanks Remediation Program strategy and plans for Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-06-01

    The overall objective of the Inactive Tank Remediation Program is to remediate all LLLW tanks that have been removed fimn service to the extent practicable in accordance with the FFA and CERCLA requirements. Applicable or relevant and appropriate requirements (ARARs) will be addressed in choosing a remediation alternative. Preference will be given to remedies that are highly reliable and provide long-term protection. Efforts will be directed toward permanently and significantly reducing the volume, toxicity, or mobility of hazardous substances, pollutants, and contaminants associated with the tank systems. Where indicated by operational or other restraints, interim measures short of full and complete remediation may be taken to maintain human health and ecological risks at acceptable levels until full remediation can be accomplished

  20. 32 CFR 516.68 - Program Fraud Civil Remedies Act (PFCRA).

    Science.gov (United States)

    2010-07-01

    ... AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption § 516.68 Program... the capability of the government to deter and recover losses from false, fictitious or fraudulent...

  1. Program summary for the Office of Remedial Action and Waste Technology

    International Nuclear Information System (INIS)

    1989-10-01

    The US Department of Energy is the lead Federal agency responsible for planning and implementing the programs that ensure safe and efficient management of nuclear wastes from both civilian and defense activities. Within the Department, three offices share this responsibility: the Office of Remedial Action and Waste Technology, the Office of Civilian Radioactive Waste Management, and the Office of Defense Waste and Transportation Management. This document summarizes the programs managed by the Office of Remedial Action and Waste Technology

  2. Development of a waste minimization plan for a Department of Energy remedial action program: Ideas for minimizing waste in remediation scenarios

    International Nuclear Information System (INIS)

    Hubbard, Linda M.; Galen, Glen R.

    1992-01-01

    Waste minimization has become an important consideration in the management of hazardous waste because of regulatory as well as cost considerations. Waste minimization techniques are often process specific or industry specific and generally are not applicable to site remediation activities. This paper will examine ways in which waste can be minimized in a remediation setting such as the U.S. Department of Energy's Formerly Utilized Sites Remedial Action Program, where the bulk of the waste produced results from remediating existing contamination, not from generating new waste. (author)

  3. Evaluation of the 1987-1988 EIA Remedial and Compensatory Program.

    Science.gov (United States)

    South Carolina State Dept. of Education, Columbia. Office of Research.

    Evaluation of South Carolina's 1987-88 Remedial and Compensatory Program, funded by the state's Education Improvement Act of 1984 (EIA), shows that the program was successful in raising the participants' achievement. The programs include basic skills learning in reading and mathematics in all grades, and writing in grades 6-12, but not all grades…

  4. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    Science.gov (United States)

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  5. Background report for the uranium-mill-tailings-sites remedial-action program

    International Nuclear Information System (INIS)

    1981-04-01

    The Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, mandates remedial action responsibilities to the Department of Energy for designated inactive uranium processing sites. To comply with the mandates of the Act, a program to survey and evaluate the radiological conditions at inactive uranium processing sites and at vicinity properties containing residual radioactive material derived from the sites is being conducted; the Remedial Action Program Office, Office of the Assistant Secretary for Nuclear Energy is implementing remedial actions at these processing sites. This report provides a brief history of the program, a description of the scope of the program, and a set of site-specific summaries for the 22 locations specified in the Act and three additional locations designated in response to Federal Register notices issued on August 17 and September 5, 1979. It is designed to be a quick source of background information on sites covered by the implementation program for Public Law 95-604

  6. Waste management and environmental compliance aspects of a major remedial action program

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.

    1991-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) is one of four major programs undertaken by the US Department of Energy (DOE) to remediate various sites where radiological contamination remained from programs conducted during the nation's early years of research and development in atomic energy. The remedial actions at the 33 sites that are currently in FUSRAP could generate an estimated total volume of about 1.6 million cubic meters of radioactive waste. Waste disposal is currently estimated to represent about one-third of the total estimated $2.1 billion cost for the entire program over its total duration. Waste management aspects within the program are diverse. The sites range in size from small areas used only for storage operations to large-scale decommissioned industrial facilities where uranium processing and other operations were carried out in the past. Currently, four sites are on the National Priorities List for remediation. Remedial actions at FUSRAP sites have to satisfy the requirements of both the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation and Liability Act, as amended. In addition, a number of federal, state, and local laws as well as Executive Orders and DOE Orders may be applicable or relevant to each site. Several key issues currently face the program, including the mixed waste issue, both from the environmental compliance (with Resource Conservation and Recovery Act) and the disposal technology perspectives. 7 refs., 1 tab

  7. Summary of the landfill remediation problems and technology needs of the Oak Ridge Reservation Environmental Restoration Programs

    International Nuclear Information System (INIS)

    1991-01-01

    This report discusses the following topics: brief description of the Oak Ridge Reservation Environmental Restoration Program; descriptions of representative waste burials at each site; ongoing, planned, or potential remediation; known or anticipated remediation problems; potential applications for robotics in the remediation of Oak Ridge Reservation landfills

  8. 77 FR 21433 - Regulated Navigation Area; Pacific Sound Resources and Lockheed Shipyard EPA Superfund Cleanup...

    Science.gov (United States)

    2012-04-10

    ... superfund cleanup remediation efforts. This RNA will prohibit activities that would disturb the seabed, such... or capped are arsenic, copper, lead, mercury, zinc, PAHs and PCBs. The metal contaminants were... installed in the designated regulated navigation area, pursuant to the remediation efforts of the U.S...

  9. Program overview: Remedial actions at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Bates, L.D.; Trabalka, J.R.

    1988-01-01

    Research on and development of civilian and defense uses of nuclear materials and technologies have occurred at Oak Ridge National Laboratory (ORNL) since its creation as part of the World War II Manhattan Project in 1943. A diverse legacy of contaminated inactive facilities, research areas, and waste management areas exists; many are candidates for remedial action. Most attention is focused on waste management sites which contain the bulk of ORNL's environmental contamination. A wide variety of liquid and solid wastes, primarily radioactive wastes or mixed wastes in which radioactivity was the principal hazardous constituent, have been disposed of on-site in the past 45 years. One potential approach to remedial problems at ORNL is to design primarily for control and decay in situ (during an institutional control period of 100 years or more) of intermediate-lived wastes such as 3 H, 90 Sr, and 137 Cs. Passive measures designed to provide greater long-term confinement (for example, in situ vitrification) could be exercised at sites contaminated with TRU wastes or high concentrations of hazardous constitutes. This approach would (a) provide a period sufficiently long for evaluation of the effectiveness of environmental processes and passive remedial measures in controlling the migration of long-lived materials, (b) allow additional time needed for development of new technologies for more permanent site stabilization, and (c) reduce the need for immediate implementation of the more-expensive exhumation and disposal option

  10. In Situ Remediation Integrated Program, Evaluation and assessment of containment technology

    International Nuclear Information System (INIS)

    Gerber, M.A.; Fayer, M.J.

    1994-04-01

    The In Situ Remediation Integrated Program (ISRIP) was established by the US Department of Energy (DOE) to advance the state-of-the art of innovative in situ remediation technologies to the point of demonstration and to broaden the applicability of these technologies to the widely varying site remediation requirements throughout the DOE complex. This program complements similar ongoing integrated demonstration programs being conducted at several DOE sites. The ISRIP has been conducting baseline assessments on in situ technologies to support program planning. Pacific Northwest Laboratory conducted an assessment and evaluation of subsurface containment barrier technology in support of ISRIP's Containment Technology Subprogram. This report summarizes the results of that activity and provides a recommendation for priortizing areas in which additional research and development is needed to advance the technology to the point of demonstration in support of DOE's site restoration activities

  11. Do Supplemental Remedial Reading Programs Address the Motivational Issues of Struggling Readers? An Analysis of Five Popular Programs.

    Science.gov (United States)

    Quirk, Matthew P; Schwanenflugel, Paula J

    2004-04-01

    Five popular, but distinctly different, remedial reading programs were reviewed regarding the potential to motivate children to read. It is argued that current remedial reading program designs and research on program effectiveness ignore the impact that motivation has on struggling readers. In addition, we develop a theory of reading motivation specific to struggling readers that highlights motivational constructs we feel are important to the improvement of reading skill for this population of students. The three aspects of reading motivation most relevant to the instruction of remedial readers include: (a) improving reading self-efficacy; (b) making internal and controllable outcome attributions for successes and failures associated with reading; and (c) establishing personally relevant value in becoming a better reader. We conclude that, while most programs address some motivational issues and other issues not at all, most programs could make minor modifications that would greatly enhance their motivational impact.

  12. Inactive tanks remediation program strategy and plans for Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-03-01

    This report presents plans and strategies for remediation of the liquid low-level waste (LLLW) tanks that have been removed from service (also known as inactive tanks) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. These plans and strategies will be carried out by the Environmental Restoration Program's Inactive LLLW Tank Program at ORNL. These tanks are defined as Category D tanks because they are existing tank systems without secondary containment that are removed from service. The approach to remediation of each tank or tank farm must be adapted in response to the specific circumstances of individual tank sites. The approach will be tailored to accommodate feedback on lessons learned from previous tank remediation activities and will not be a rigid step-by-step approach that must be conducted identically for every tank system. However, the approach will follow a multistep decision process. The overall objective of the Inactive Tank Program is to remediate all LLLW tanks that have been removed from service to the extent practicable in accordance with the FFA requirements. The Inactive Tank Program will focus on the remediation of the tank residues (i.e., contents after tank has been emptied) and tank shell. This strategy is discussed in detail in this report

  13. Inactive tanks remediation program strategy and plans for Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-11-01

    This report presents plans and strategies for remediation of the liquid low-level waste (LLLW) tanks that have been removed from service (also known as inactive tanks) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. These plans and strategies will be carried out by the Environmental Restoration Program's Inactive LLLW Tank Program at ORNL. The approach to remediation of each tank or tank farm must be adapted in response to the specific circumstances of individual tank sites. The approach will be tailored to accommodate feedback on lessons learned from previous tank remediation activities and will not be a rigid step-by-step approach that must be conducted identically for every tank system. However, the approach will follow a multistep decision process. The overall objective of the Inactive Tank Program is to remediate all LLLW tanks that have been removed from service to the extent practicable in accordance with the FFA requirements. The Inactive Tank Program will focus on the remediation of the tank residues and tank shell. This strategy is discussed in detail in this report

  14. Office of Technology Development integrated program for development of in situ remediation technologies

    International Nuclear Information System (INIS)

    Peterson, M.

    1992-08-01

    The Department of Energy's Office of Technology Development has instituted an integrated program focused on development of in situ remediation technologies. The development of in situ remediation technologies will focus on five problem groups: buried waste, contaminated soils, contaminated groundwater, containerized wastes and underground detonation sites. The contaminants that will be included in the development program are volatile and non volatile organics, radionuclides, inorganics and highly explosive materials as well as mixtures of these contaminants. The In Situ Remediation Integrated Program (ISR IP) has defined the fiscal year 1993 research and development technology areas for focusing activities, and they are described in this paper. These R ampersand D topical areas include: nonbiological in situ treatment, in situ bioremediation, electrokinetics, and in situ containment

  15. Analysis of SPR salt cavern remedial leach program 2013.

    Energy Technology Data Exchange (ETDEWEB)

    Weber, Paula D.; Gutierrez, Karen A.; Lord, David L.; Rudeen, David Keith

    2013-09-01

    The storage caverns of the US Strategic Petroleum Reserve (SPR) exhibit creep behavior resulting in reduction of storage capacity over time. Maintenance of oil storage capacity requires periodic controlled leaching named remedial leach. The 30 MMB sale in summer 2011 provided space available to facilitate leaching operations. The objective of this report is to present the results and analyses of remedial leach activity at the SPR following the 2011 sale until mid-January 2013. This report focuses on caverns BH101, BH104, WH105 and WH106. Three of the four hanging strings were damaged resulting in deviations from normal leach patterns; however, the deviations did not affect the immediate geomechanical stability of the caverns. Significant leaching occurred in the toes of the caverns likely decreasing the number of available drawdowns until P/D ratio criteria are met. SANSMIC shows good agreement with sonar data and reasonably predicted the location and size of the enhanced leaching region resulting from string breakage.

  16. Generic radiological characterization protocol for surveys conducted for DOE remedial action programs

    International Nuclear Information System (INIS)

    Berven, B.A.; Cottrell, W.D.; Leggett, R.W.; Little, C.A.; Myrick, T.E.; Goldsmith, W.A.; Haywood, F.F.

    1986-05-01

    This report describes goals and methodology that can be used by radiological survey contractors in surveys at properties associated with the Department of Energy's remedial action programs. The description includes: (1) a general discussion of the history of the remedial action programs; (2) the types of surveys that may be employed by the Radiological Survey Activities (RASA) contractor; (3) generic survey methods that may be used during radiological surveys; and (4) a format for presenting information and data in a survey report. 9 refs

  17. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a selected set of...

  18. Quality assurance program plan for the Radiological Survey Activities Program - Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-01-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  19. Quality assurance program plan for the radiological survey activities program: Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-08-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  20. Review of standards and guidelines pertinent to DOE's remedial action programs

    International Nuclear Information System (INIS)

    Soldat, J.K.; Denham, D.H.

    1984-10-01

    A number of radiological standards, guidelines, and dose criteria have been promulgated that may be relevant to the Department of Energy's (DOE) Remedial Action programs. Some of these will be applied to remedial actions undertaken by DOE to ensure that health and safety aspects will be adequately addressed. Pacific Northwest Laboratory staff are reviewing and evaluating existing and proposed environmental radiological standards and criteria for their applicability. National and international environmental standards and criteria, and studies conducted by other DOE contractors are being evaluated. The aim of the review is to identify gaps in these standards and guidelines and to recommend further development as necessary. This paper provides a summary of the standards and guidelines evaluated for applicability to DOE's Remedial Action programs. 33 references, 5 tables

  1. Review of standards and guidelines pertinent to DOE's Remedial Action programs

    International Nuclear Information System (INIS)

    Soldat, J.K.; Denham, D.H.

    1985-01-01

    A number of radiological standards, guidelines, and dose criteria have been promulgated that may be relevant to the Department of Energy's (DOE) Remedial Action programs. Some of these are being applied to remedial actions undertaken by DOE to ensure that health and safety aspects are adequately addressed. Pacific Northwest Laboratory staff reviewed existing and proposed environmental radiological standards and criteria for their applicability to DOE's Remedial Action Programs. National and international environmental standards and criteria, and studies conducted by other DOE contractors were reviewed. The review indicated that there is a lack of uniformity between the dose guidelines developed by the various agencies. A uniform dose standard is needed for DandD, at least as an upper limit with application of the ALARA philosophy. 33 references, 5 tables

  2. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, Christopher [U.S Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S Department of Energy Office of Legacy Management, Westminster, Colorado; Widdop, Michael; Gillespie, Joey [SM Stoller Corporation, Grand Junction, Colorado

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with the U

  3. Line Program Environmental Management Audit: Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1992-05-01

    This report documents the results of the Line Program Environmental Management Audit completed for the Formerly Utilized Sites Remedial Action Program (FUSRAP). During this Audit, activities and records were reviewed and personnel interviewed at Oak Ridge, Tennessee. Additionally, since FUSRAP falls under the responsibility of the Office of the Assistant Secretary for Environmental Restoration and Waste Management, selected individuals from this office were interviewed in Washington, DC and Germantown, Maryland. The onsite portion of the FUSRAP Audit was conducted from March 16 through 27, 1992, by the US Department of Energy's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety and Health (EH-1). The scope of the FUSRAP Line Program Environmental Management Audit was comprehensive and included all areas of environmental management with the exception of the National Environmental Policy Act (NEPA). Since the subject of compliance with and implementation of the requirements of NEPA is the responsibility of the DOE Headquarters Office of NEPA Oversight, management issues pertaining to NEPA were not investigated as part of this Audit

  4. TECHNOLOGY EVALUATION REPORT, SITE PROGRAM DEMONSTRATION TEST: SHIRCO PILOT-SCALE INFRARED INCINERATION SYSTEM ROSE TOWNSHIP DEMODE ROAD SUPERFUND SITE - VOLUME II

    Science.gov (United States)

    The performance of the Shirco pilot-scale infrared thermal destruction system has been evaluated at the Rose Township, Demode Road Superfund Site and is presented in the report. The waste tested consisted of solvents, organics and heavy metals in an illegal dump site. Volume I gi...

  5. Soil and groundwater remediation through the program of energy research and development at Environment Canada

    International Nuclear Information System (INIS)

    Bacchus, P.

    2005-01-01

    Research and development in groundwater and soil remediation within the federal Program of Energy Research and Development (PERD) are conducted in the context of activities related to the oil and gas industry. Contamination of groundwater and soil by the oil and gas sector affects the health of ecosystems and the economic viability of impacted lands. This paper presented an outline of remediation research and development activities associated with PERD, as well as an overview of PERD's development of improved generic remediation technologies and approaches for use by industries. In addition, issues concerning the development of key guidelines, methods and protocols for use by regulators were discussed. Science and technology efforts within PERD contribute to the development of national standards and guidelines concerning public safety and environmental needs

  6. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases

  7. Using Neurolinguistic Programming: Some Suggestions for the Remedial Teacher.

    Science.gov (United States)

    Burton, Grace M.

    1986-01-01

    The use of neurolinguistic programming techniques is suggested as a means of enhancing rapport with students. Mirroring, digital mirroring, analog mirroring, metaphors, knowing persons, and how these aid in presenting content are each discussed. (MNS)

  8. Progress report on the Grand Junction uranium mill tailings remedial action program

    International Nuclear Information System (INIS)

    1979-02-01

    The report provides a history of the program, an analysis of the current status of the program, problems encountered and measures being taken to solve them, and a forecast of future effort required. From the start of remedial efforts in 1973 through September 30, 1978, remedial action has been done on 325 individual structures, including 289 private residences, 14 schools, and 22 commercial business/church locations. As recently as one year ago, the total number of structures requiring remedial action was estimated to be about 600. However, continuing measurements of radon daughter concentrations in structures which previously showed only slightly elevated gamma radiation have resulted in identificaion of additional structures exceeding the Surgeon General's guidelines for radon daughters. Because radon daughter concentrations in structures are highly variable depending on the season of the year and the level of activity, annual averages are used for determining eligibility under the guidelines. Based on this recent experience the estimate of the total number of structures which will eventually qualify for remedial action has been increased from 600 to 800, and the estimated total program cost has been increased from $12,670,000 to $16,960,000. It must be emphasized that these estimates are based only on experience ratios of past measurements and are highly uncertain. It is not expected that further funding, if necessary, will be required before fiscal year 1982

  9. DOE Hazardous Waste Remedial Actions Program: Annual report, FY 1986

    International Nuclear Information System (INIS)

    Eyman, L.D.

    1987-05-01

    The activities of HAZWRAP for the past fiscal year were organized into seven principal areas: technical analysis and technology transfer; regulatory analysis; strategic planning;information systems; program administration; technology adaptation; and technology demonstration. The scope, major FY 1986 accomplishments, and future directions for each of these areas are described in the following sections of this report. Listings of reports produced through the SCO are given in Appendixes A and B for the current year and since the program started, respectively

  10. SHIRCO PILOT-SCALE INFRARED INCINERATION SYSTEM AT THE ROSE TOWNSHIP DEMODE ROAD SUPERFUND SITE

    Science.gov (United States)

    Under the Superfund Innovative Technology Evaluation or SITE Program, an evaluation was made of the Shirco Pilot-Scale Infrared Incineration System during 17 separate test runs under varying operating conditions. The tests were conducted at the Demode Road Superfund site in Ros...

  11. Tank waste remediation system heat stress control program report, 1995

    International Nuclear Information System (INIS)

    Carls, D.R.

    1995-01-01

    Protecting employees from heat stress within tank farms during the summer months is challenging. Work constraints typically experienced in tank farms complicate the measures taken to protect employees from heat stress. TWRS-Industrial Hygiene (IH) has endeavored to control heat stress injuries by anticipating, recognizing, evaluating and controlling the factors which lead or contribute to heat stress in Tank Farms. The TWRS Heat Stress Control Program covers such areas as: employee and PIC training, communication of daily heat stress alerts to tank farm personnel, setting work/rest regimens, and the use of engineering and personal protective controls when applicable. The program has increased worker awareness of heat stress and prevention, established provisions for worker rest periods, increased drinking water availability to help ensure worker hydration, and allowed for the increased use of other protective controls to combat heat stress. The TWRS Heat Stress Control Program is the cornerstone for controlling heat stress among tank farm employees. The program has made great strides since it's inception during the summer of 1994. Some improvements can still be made to enhance the program for the summer of 1996, such as: (1) procurement and use of personal heat stress monitoring equipment to ensure appropriate application of administrative controls, (2) decrease the need for use of containment tents and anti-contamination clothing, and (3) providing a wider variety of engineering and personal protective controls for heat stress prevention

  12. DOE's Innovative Treatment Remediation Demonstration Program accelerating the implementation of innovative technologies

    International Nuclear Information System (INIS)

    Hightower, M.

    1995-01-01

    A program to help accelerate the adoption and implementation of new and innovative remediation technologies has been initiated by the Department of Energy's (DOE) Environmental Restoration Program Office (EM40). Developed as a Public-Private Partnership program in cooperation with the US Environmental Protection Agency's (EPA) Technology Innovation Office (TIO) and coordinated by Sandia National Laboratories, the Innovative Treatment Remediation Demonstration (ITRD) Program attempts to reduce many of the classic barriers to the use of new technologies by involving government, industry, and regulatory agencies in the assessment, implementation, and validation of innovative technologies. In this program, DOE facilities work cooperatively with EPA, industry, national laboratories, and state and federal regulatory agencies to establish remediation demonstrations using applicable innovative technologies at their sites. Selected innovative technologies are used to remediate small, one to two acre, sites to generate the full-scale and real-world operating, treatment performance, and cost data needed to validate these technologies and gain acceptance by industry and regulatory agencies, thus accelerating their use nationwide. Each ITRD project developed at a DOE site is designed to address a typical soil or groundwater contamination issue facing both DOE and industry. This includes sites with volatile organic compound (VOC), semi-VOC, heavy metal, explosive residue, and complex or multiple constituent contamination. Projects are presently underway at three DOE facilities, while additional projects are under consideration for initiation in FY96 at several additional DOE sites. A brief overview of the ITRD Program, program plans, and the status and progress of existing ITRD projects are reviewed in this paper

  13. Restoration principles and criteria: Superfund programme policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Shapiro, M.

    2000-01-01

    The Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response is responsible for implementing two key US laws regulating waste management and cleanup: the Resource Conservation and Recovery Act, and the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed ''Superfund''. The purpose of the Superfund programme is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund programme. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in the identical way as chemical contamination. (author)

  14. Tank Waste Remediation System Inactive Miscellaneous Underground Storage Tanks Program Plan

    International Nuclear Information System (INIS)

    Gustavson, R.D.

    1995-12-01

    The Program Management Plan (PMP) describes the approach that will be used to manage the Tank Waste Remediation System (TWRS) Inactive Miscellaneous Underground Storage Tank (IMUST) Program. The plan describes management, technical, and administrative control systems that will be used to plan and control the IMUSTs Program performance. The technical data to determine the IMUSTs status for inclusion in the Single Shell Tank Farm Controlled Clean and Stable (CCS) Program. The second is to identify and implement surveillance, characterization, stabilization, and modifications to support CCS prior to final closure

  15. Radiological guidelines for application to DOE's Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1983-03-01

    The US Department of Energy has implemented a program to evaluate and, where necessary, take action to protect the public from contamination at sites that were used in the past to process and/or store radioactive materials for the former US Army Corps of Engineers Manhattan Engineer District or the US Atomic Energy Commission. The program is identified as the Formerly Utilized Sites Remedial Action Program (FUSRAP). This document describes methods considered appropriate for the evaluation of health effects that might possible be caused by radioactive contamination at FUSRAP sites. This assessment methodology is applied to a typical site for the purposeof deriving guidelines for the cleanup of contaminated soil. Additional guidance is provided for planning site-specific remedial action that is consistent with the overall objectives of FUSRAP

  16. RC2S: a cognitive remediation program to improve social cognition in schizophrenia and related disorders

    Directory of Open Access Journals (Sweden)

    Elodie ePEYROUX

    2014-06-01

    Full Text Available In people with psychiatric disorders, particularly those suffering from schizophrenia and related illnesses, pronounced difficulties in social interactions are a key manifestation. These difficulties can be partly explained by impairments in social cognition, defined as the ability to understand oneself and others in the social world, which includes abilities such as emotion recognition, theory of mind, attributional style, and social perception and knowledge. The impact of several kinds of interventions on social cognition has been studied recently. The best outcomes in the area of social cognition in schizophrenia are those obtained by way of cognitive remediation programs. New strategies and programs in this line are currently being developed, such as RC2S (Cognitive Remediation of Social Cognition in Lyon, France. Considering that the social cognitive deficits experienced by patients with schizophrenia are very diverse, and that the main objective of social cognitive remediation programs is to improve patients’ functioning in their daily social life, RC2S was developed as an individualized and flexible program that allows patients to practice social interaction in a realistic environment through the use of virtual-reality techniques. In the RC2S program, the patient’s goal is to assist a character named Tom in various social situations. The underlying idea for the patient is to acquire cognitive strategies for analyzing social context and emotional information in order to understand other characters’ mental states and to help Tom manage his social interactions. In this paper, we begin by presenting some data regarding the social cognitive impairments found in schizophrenia and related disorders, and we describe how these deficits are targeted by social cognitive remediation. Then we present the RC2S program and discuss the advantages of computer-based simulation to improve social cognition and social functioning in people with

  17. RC2S: A Cognitive Remediation Program to Improve Social Cognition in Schizophrenia and Related Disorders.

    Science.gov (United States)

    Peyroux, Elodie; Franck, Nicolas

    2014-01-01

    In people with psychiatric disorders, particularly those suffering from schizophrenia and related illnesses, pronounced difficulties in social interactions are a key manifestation. These difficulties can be partly explained by impairments in social cognition, defined as the ability to understand oneself and others in the social world, which includes abilities such as emotion recognition, theory of mind (ToM), attributional style, and social perception and knowledge. The impact of several kinds of interventions on social cognition has been studied recently. The best outcomes in the area of social cognition in schizophrenia are those obtained by way of cognitive remediation programs. New strategies and programs in this line are currently being developed, such as RC2S (cognitive remediation of social cognition) in Lyon, France. Considering that the social cognitive deficits experienced by patients with schizophrenia are very diverse, and that the main objective of social cognitive remediation programs is to improve patients' functioning in their daily social life, RC2S was developed as an individualized and flexible program that allows patients to practice social interaction in a realistic environment through the use of virtual reality techniques. In the RC2S program, the patient's goal is to assist a character named Tom in various social situations. The underlying idea for the patient is to acquire cognitive strategies for analyzing social context and emotional information in order to understand other characters' mental states and to help Tom manage his social interactions. In this paper, we begin by presenting some data regarding the social cognitive impairments found in schizophrenia and related disorders, and we describe how these deficits are targeted by social cognitive remediation. Then we present the RC2S program and discuss the advantages of computer-based simulation to improve social cognition and social functioning in people with psychiatric disorders.

  18. RC2S: A Cognitive Remediation Program to Improve Social Cognition in Schizophrenia and Related Disorders

    Science.gov (United States)

    Peyroux, Elodie; Franck, Nicolas

    2014-01-01

    In people with psychiatric disorders, particularly those suffering from schizophrenia and related illnesses, pronounced difficulties in social interactions are a key manifestation. These difficulties can be partly explained by impairments in social cognition, defined as the ability to understand oneself and others in the social world, which includes abilities such as emotion recognition, theory of mind (ToM), attributional style, and social perception and knowledge. The impact of several kinds of interventions on social cognition has been studied recently. The best outcomes in the area of social cognition in schizophrenia are those obtained by way of cognitive remediation programs. New strategies and programs in this line are currently being developed, such as RC2S (cognitive remediation of social cognition) in Lyon, France. Considering that the social cognitive deficits experienced by patients with schizophrenia are very diverse, and that the main objective of social cognitive remediation programs is to improve patients’ functioning in their daily social life, RC2S was developed as an individualized and flexible program that allows patients to practice social interaction in a realistic environment through the use of virtual reality techniques. In the RC2S program, the patient’s goal is to assist a character named Tom in various social situations. The underlying idea for the patient is to acquire cognitive strategies for analyzing social context and emotional information in order to understand other characters’ mental states and to help Tom manage his social interactions. In this paper, we begin by presenting some data regarding the social cognitive impairments found in schizophrenia and related disorders, and we describe how these deficits are targeted by social cognitive remediation. Then we present the RC2S program and discuss the advantages of computer-based simulation to improve social cognition and social functioning in people with psychiatric disorders

  19. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    Science.gov (United States)

    This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse and redevelopment of BRAC federal properties. When the BRAC program began in the early 1990s, EPA worked with DoD and the states to identify uncontaminated areas and these parcels were immediately made available for reuse. Since then EPA has worked with DoD to clean up the contaminated portions of bases. These are usually parcels that were training ranges, landfills, maintenance facilities and other past waste-disposal areas. Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned.This data layer shows Superfund Sites that are located at BRAC Federal Facilities. Additional Superfund sites and other BRAC sites (those that are not Superfund sites) are included in other data layers as part of this web service.BRAC Superfund Sites shown in this web service are derived from the epa.gov website and include links to the relevant web pages within the attribute table. Data about BRAC Superfund Sites are located on their own EPA web pages, and CIMC links to those pages. The CIMC web service

  20. Technology needs for environmental restoration remedial action. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  1. Tank waste remediation system vadose zone program plan

    International Nuclear Information System (INIS)

    Fredenburg, E.A.

    1998-01-01

    The objective of the vadose zone characterization under this program is to develop a better conceptual geohydrologic model of identified tank farms which will be characterized so that threats to human health and the environment from past leaks and spills, intentional liquid discharges, potential future leaks during retrieval, and from residual contaminants that may remain in tank farms at closure can be explicitly addressed in decision processes. This model will include geologic, hydrologic, and hydrochemical parameters as defined by the requirements of each of the TWRS programs identified here. The intent of this TWRS Vadose Zone Program Plan is to provide justification and an implementation plan for the following activities: Develop a sufficient understanding of subsurface conditions and transport processes to support decisions on management, cleanup, and containment of past leaks, spills, and intentional liquid discharges; Develop a sufficient understanding of transport processes to support decisions on controlling potential retrieval leaks; Develop a sufficient understanding of transport processes to support decisions on tank farm closure, including allowable residual waste that may remain at closure; and Provide new information on geotechnical properties in the 200 Area to supplement data used for design and performance assessment for immobilized low-activity waste disposal facilities

  2. Tank waste remediation system vadose zone program plan

    Energy Technology Data Exchange (ETDEWEB)

    Fredenburg, E.A.

    1998-07-27

    The objective of the vadose zone characterization under this program is to develop a better conceptual geohydrologic model of identified tank farms which will be characterized so that threats to human health and the environment from past leaks and spills, intentional liquid discharges, potential future leaks during retrieval, and from residual contaminants that may remain in tank farms at closure can be explicitly addressed in decision processes. This model will include geologic, hydrologic, and hydrochemical parameters as defined by the requirements of each of the TWRS programs identified here. The intent of this TWRS Vadose Zone Program Plan is to provide justification and an implementation plan for the following activities: Develop a sufficient understanding of subsurface conditions and transport processes to support decisions on management, cleanup, and containment of past leaks, spills, and intentional liquid discharges; Develop a sufficient understanding of transport processes to support decisions on controlling potential retrieval leaks; Develop a sufficient understanding of transport processes to support decisions on tank farm closure, including allowable residual waste that may remain at closure; and Provide new information on geotechnical properties in the 200 Area to supplement data used for design and performance assessment for immobilized low-activity waste disposal facilities.

  3. Quality Assurance Program Plan for the radiological survey activities program --- Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Knott, R.R.; Little, C.A.

    1991-08-01

    The Pollutant Assessments Group (PAG) at the Grand Junction Office (GJO), Colorado, of Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude these sites from UMTRAP based on whether the on-site residual radioactive material (if any) originated from the former mill sites, and radiation levels on-site are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the Quality Assurance Plan (QAP) for the PAG in conducting all activities related to UMTRAP. All quality assurance provisions given by the DOE, DOE/UMTRA and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the PAG/UMTRA QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups. 11 refs., 6 figs., 3 tabs

  4. Remediation in the Context of the Competencies: A Survey of Pediatrics Residency Program Directors

    Science.gov (United States)

    Riebschleger, Meredith P.; Haftel, Hilary M.

    2013-01-01

    Background The 6 competencies defined by the Accreditation Council for Graduate Medical Education provide the framework of assessment for trainees in the US graduate medical education system, but few studies have investigated their impact on remediation. Methods We obtained data via an anonymous online survey of pediatrics residency program directors. For the purposes of the survey, remediation was defined as “any form of additional training, supervision, or assistance above that required for a typical resident.” Respondents were asked to quantify 3 groups of residents: (1) residents requiring remediation; (2) residents whose training was extended for remediation purposes; and (3) residents whose training was terminated owing to issues related to remediation. For each group, the proportion of residents with deficiencies in each of the 6 competencies was calculated. Results In all 3 groups, deficiencies in medical knowledge and patient care were most common; deficiencies in professionalism and communication were moderately common; and deficiencies in systems-based practice and practice-based learning and improvement were least common. Residents whose training was terminated were more likely to have deficiencies in multiple competencies. Conclusion Although medical knowledge and patient care are reported most frequently, deficiencies in any of the 6 competencies can lead to the need for remediation in pediatrics residents. Residents who are terminated are more likely to have deficits in multiple competencies. It will be critical to develop and refine tools to measure achievement in all 6 competencies as the graduate medical education community may be moving further toward individualized training schedules and competency-based, rather than time-based, training. PMID:24404228

  5. 76 FR 20287 - Superfund Site, New Bedford Harbor, New Bedford, MA: Anchorage Ground and Regulated Navigation Area

    Science.gov (United States)

    2011-04-12

    ... may lead to the discovery of a significant environmental impact from this proposed rule. List of... engaged in activities associated with remediation efforts in the New Bedford Harbor Superfund Site... activity can be performed without undue risk to environmental remediation efforts. Requests for waivers...

  6. Expedited remedial action -- A promising opportunity at your doorstep

    Energy Technology Data Exchange (ETDEWEB)

    Newman, E.R.

    1996-12-31

    The Expedited Remedial Action Program or ERAP carries great promise and is limited to no more than 30 sites, there are a number of slots now available, and the legislature will soon be considering a reauthorization of the full state Superfund program, which expires in June 1998, to reportedly be based to a great extent on the ERAP model. The ERAP provides for: (1) The early identification of fair and equitable shares of liability, including an orphan share, where appropriate, to be paid by the state; (2) The elimination of all joint and several liability; (3) Cleanup levels and remedies based on the foreseeable planned use of the site; (4) Site specific risk assessments based on the latest risk assessment protocols; (5) Use of an arbitrator to quickly resolve all significant liability and technical disputes; and (6) Broad and timely releases from future liability upon completion of cleanup.

  7. Benefits of a Biological Monitoring Program for Assessing Remediation Performance and Long-Term Stewardship - 12272

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, Mark [Oak Ridge National Laboratory, Oak Ridge, Tennessee 37831 (United States)

    2012-07-01

    The Biological Monitoring and Abatement Program (BMAP) is a long-running program that was designed to evaluate biological conditions and trends in waters downstream of Department of Energy (DOE) facilities in Oak Ridge, Tennessee. BMAP monitoring has focused on aquatic pathways from sources to biota, which is consistent with the sites' clean water regulatory focus and the overall cleanup strategy which divided remediation areas into watershed administrative units. Specific programmatic goals include evaluating operational and legacy impacts to nearby streams and the effectiveness of implemented remediation strategies at the sites. The program is characterized by consistent, long-term sampling and analysis methods in a multidisciplinary and quantitative framework. Quantitative sampling has shown conclusively that at most Oak Ridge stream sites, fish and aquatic macro-invertebrate communities have improved considerably since the 1980s. Monitoring of mercury and PCBs in fish has shown that remedial and abatement actions have also improved stream conditions, although in some cases biological monitoring suggests further actions are needed. Follow-up investigations have been implemented by BMAP to identify sources or causes, consistent with an adaptive management approach. Biological monitoring results to date have not only been used to assess regulatory compliance, but have provided additional benefits in helping address other components of the DOE's mission, including facility operations, natural resource, and scientific goals. As a result the program has become a key measure of long-term trends in environmental conditions and of high value to the Oak Ridge environmental management community, regulators, and the public. Some of the BMAP lessons learned may be of value in the design, implementation, and application of other long-term monitoring and stewardship programs, and assist environmental managers in the assessment and prediction of the effectiveness of

  8. Data base management activities for the Remedial Action Program at ORNL, calendar year 1987

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Hook, L.A.; Gentry, M.J.; McCord, R.A.; Faulkner, M.A.; Newman, K.A.; Owen, P.T.

    1988-05-01

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP) was established in FY 1985 to apply corrective measures at areas contaminated with radioactive and/or hazardous chemical wastes. To achieve this goal, numerous and varied studies are being conducted to characterize the waste disposal sites. Environmental data collected in support of other programs at ORNL are also of use to RAP. These studies are generating a voluminous amount of data on a scale unprecedented for ORNL. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. 10 refs., 25 figs., 16 tabs

  9. An introduction to geographic information systems as applied to a groundwater remediation program

    International Nuclear Information System (INIS)

    Hammock, J.K.; Lorenz, R.

    1989-01-01

    While the attention to environmental issues has grown over the past several years, so has the focus on groundwater protection. Addressing the task of groundwater remediation often involves a large-scale program with numerous wells and enormous amounts of data. This data must be manipulated and analyzed in an efficient manner for the remediation program to be truly effective. Geographic Information System's (GIS) have proven to be an extremely effective tool in handling and interpreting this type of groundwater information. The purpose of this paper is to introduce the audience to GIS technology, describe how it is being used at the Savannah River Site (SRS) to handle groundwater data and demonstrate how it may be used in the corporate Westinghouse environment

  10. Annual status report on the Uranium Mill Tailings Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA).

  11. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA)

  12. Data base management for the Remedial Action Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Cushman, R.M.; Faulkner, M.A.; Horwedel, B.M.

    1986-08-01

    The Oak Ridge National Laboratory's (ORNL's) Remedial Action Program was established to provide appropriate corrective measures at over 140 sites that were contaminated with radioactive and/or hazardous chemical wastes. To achieve this goal, numerous and varied studies are being conducted which will result in the collection of an unprecedented amount of data for the ORNL site. To manage such data effectively and efficiently, a computerized data base is being developed. The data base provides a unified repository for all data generated within the Remedial Action Program, to allow for necessary storage, manipulation, analyses, assessment, display, and report generation. Data base management for the Remedial Action Program is documented in this report by: (1) defining the organization of the data management staff and the services provided; (2) describing the design of the data base, including its management system, organization, and applications; (3) providing examples of the current and anticipated tasks; and (4) discussing quality assurance measures implemented to control the accuracy of the data entries and the security of the data

  13. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-01-01

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses

  14. Technical assistance to Department of Energy/Office of Operational Safety Assurance Program for remedial action

    International Nuclear Information System (INIS)

    Denham, D.H.; Cross, F.T.; Kennedy, W.E. Jr.; Marks, S.; Soldat, J.K.; Stenner, R.D.

    1986-01-01

    This project was initiated in FY 1984 to provide technical assistance to the Department of Energy (DOE), Office of Operational Safety (OOS) in developing and implementing its Assurance Program for Remedial Action (APRA), i.e., overview of the DOE remedial action programs. During this second year of the project,* the technical assistance included report and procedure reviews, and assistance with conducting the Uranium Mill Tailings Remedial Action Program (UMTRAP) Office (DOE/AL) appraisal. This included participation in preappraisal visits to UMTRAP sites in Canonsburg, Pennsylvania; Grand Junction, Colorado; and Salt Lake City, Utah. Pacific Northwest Laboratory (PNL) also transferred the PNL-developed document review software to the Oak Ridge Associated Universities (ORAU) staff in Grand Junction, Colorado, in anticipation of future document reviews by the ORAU staff. Other accomplishments have included publication of two formal documents and three project reports, preparation and presentation of five topical reports at national and international meetings, two foreign trip reports, and comments on proposed draft standards of the Environmental Protection Agency (40 CFR 193). The project manager has also participated on National Council on Radiation Protection and Measurements (NCRP) and American Society for Testing and Materials (ASTM) subcommittees developing decommissioning standards, as well as International Atomic Energy Agency (IAEA) advisory groups developing environmental monitoring guidelines

  15. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-31

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.

  16. In-situ stabilization of the Geiger (C and M Oil) Superfund Site

    International Nuclear Information System (INIS)

    Andromalos, K.B.; Ameel, M.E.

    1994-01-01

    The Geiger (C and M Oil) Superfund Site is the first US Army Corps of Engineers managed soil remediation project which utilized the in-situ stabilization/solidification technique to remediate the soil. This project involved the remediation of approximately 23,000 cubic yards of contaminated soil. Contaminants of concern included chromium, lead, PCB'S, toluene, benzene, and other organic compounds. Clean-up criteria for the stabilized material was equal to the National Primary Drinking Water Regulations, when tested using the TCLP leachate extraction method. Chromium, lead, and toluene were the main contaminants of concern, with TCLP clean-up goals of 150, 15 and 1,000 parts per billion (ppb), respectively. This National Priorities List (NPL) site is located near Charleston, SC and was an abandoned old waste oil facility that utilized unlined shallow trenches for the storage of waste oil. This paper summarizes the initial testing programs and the final production work at the site. Extensive testing was performed throughout all phases of the project. This testing was performed for the purpose of mix optimization, quality assurance, and verification testing. Specific parameters tested included: TCLP testing of organics, metals and PCBs, permeability testing, and unconfirmed compression strength

  17. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  18. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Levine, M.B.

    1990-01-01

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab

  19. Early predictors of need for remediation in the Australian general practice training program: a retrospective cohort study.

    Science.gov (United States)

    Magin, Parker; Stewart, Rebecca; Turnock, Allison; Tapley, Amanda; Holliday, Elizabeth; Cooling, Nick

    2017-10-01

    Underperforming trainees requiring remediation may threaten patient safety and are challenging for vocational training programs. Decisions to institute remediation are high-stakes-remediation being resource-intensive and emotionally demanding on trainees. Detection of underperformance requiring remediation is particularly problematic in general (family) practice. We sought to establish early-training assessment instruments predictive of general practice (GP) trainees' subsequently requiring formal remediation. We conducted a retrospective cohort study of trainees from a large Australian regionally-based GP training organization. The outcome factor was requirement for formal remediation. Independent variables were demographic factors and a range of formative assessments conducted immediately prior to or during early-stage training. Analyses employed univariate and multivariate logistic regression of each predictor assessment modality with the outcome, adjusting for potential confounders. Of 248 trainees, 26 (10.5 %) required formal remediation. Performance on the Colleague Feedback Evaluation Tool (entailing feedback from a trainee's clinical colleagues on clinical performance, communication and probity) and External Clinical Teaching Visits (half-day sessions of the trainee's clinical consultations observed directly by an experienced GP), along with non-Australian primary medical qualification, were significantly associated with requiring remediation. There was a non-significant trend for association with performance on the Doctors Interpersonal Skills Questionnaire (patient feedback on interpersonal elements of the consultation). There were no significant associations with entry-selection scores or formative exam or assessment scores. Our finding that 'in vivo' assessments of complex behaviour, but not 'in vitro' knowledge-based assessments, predict need for remediation is consistent with theoretical understanding of the nature of remediation decision-making and

  20. Lead remediation and changes in human lead exposure: some physiological and biokinetic dimensions.

    Science.gov (United States)

    Mushak, Paul

    2003-02-15

    This paper presents a qualitative and quantitative analysis of the various aspects of lead remediation effectiveness with particular reference to human health risk assessment. One of the key elements of lead remediation efforts at such sites as those under the Superfund program deals with populations at elevated exposure and toxicity risk in the proximity of, or at, the site of remediation, especially remediation workers, workers at other tasks on sites that were remediated down to some action level of lead concentration in soils, and groups at risk in nearby communities. A second element has to do with how one measures or models lead exposure changes with special reference to baseline and post-remediation conditions. Various biomarkers of lead exposure can be employed, but their use requires detailed knowledge of what results using each means. The most commonly used approach is measurement of blood lead (Pb-B). Recognized limitations in the use of Pb-B has led to the use of predictive Pb exposure models, which are less vulnerable to the many behavioral, physiological, and environmental parameters that can distort isolated or 'single shot' Pb-B testings. A third aspect covered in this paper presents various physiological factors that affect the methods by which one evaluates Pb remediation effectiveness. Finally, this article offers an integrated look at how lead remediation actions directed at one lead source or pathway affect the total lead exposure picture for human populations at elevated lead exposure and toxicity risk.

  1. 75 FR 38100 - National Institute of Environmental Health Sciences Superfund Hazardous Substance Research and...

    Science.gov (United States)

    2010-07-01

    ...- traditional communication methods to make the significance and applicability of SRP-funded research... and Social Sciences Research, and National Institute of Biomedical Imaging and Bioengineering. [cir... Superfund Hazardous Substance Research and Training Program Strategic Plan; Request for Comments ACTION...

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  3. In Situ Remediation Integrated Program. In situ physical/chemical treatment technologies for remediation of contaminated sites: Applicability, developing status, and research needs

    International Nuclear Information System (INIS)

    Siegrist, R.L.; Gates, D.D.; West, O.R.; Liang, L.; Donaldson, T.L.; Webb, O.F.; Corder, S.L.; Dickerson, K.S.

    1994-06-01

    The U.S. Department of Energy (DOE) In Situ Remediation Integrated Program (ISR IP) was established in June 1991 to facilitate the development and implementation of in situ remediation technologies for environmental restoration within the DOE complex. Within the ISR IP, four subareas of research have been identified: (1) in situ containment, (2) in situ physical/chemical treatment (ISPCT), (3) in situ bioremediation, and (4) subsurface manipulation/electrokinetics. Although set out as individual focus areas, these four are interrelated, and successful developments in one will often necessitate successful developments in another. In situ remediation technologies are increasingly being sought for environmental restoration due to the potential advantages that in situ technologies can offer as opposed to more traditional ex situ technologies. These advantages include limited site disruption, lower cost, reduced worker exposure, and treatment at depth under structures. While in situ remediation technologies can offer great advantages, many technology gaps exist in their application. This document presents an overview of ISPCT technologies and describes their applicability to DOE-complex needs, their development status, and relevant ongoing research. It also highlights research needs that the ISR IP should consider when making funding decisions

  4. Superfund record of decision (EPA Region 7): Cherokee County Superfund Site, Cherokee County, KS, July 29, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The decision document presents the selected remedial action for the mining wastes at Operable Unit No. 07 of the Galena Subsite, which is part of the Cherokee County Superfund Site in Cherokee County, Kansas. The selected remedy includes actions for residential soils impacted by mining wastes and includes: Excavation and disposal of residential soils impacted by mining wastes; Health education for the general community and medical professionals; Institutional controls to guide future development in residential areas impacted by mining wastes; Treatability studies to evaluate the effectiveness of phosphate stabilization as a future alternative; and Operation and maintenance of all remedy aspects including, but not limited to, health education, institutional controls, and long-term monitoring.

  5. « Cognitus & Moi » : a computer-based cognitive remediation program for children with intellectual disability

    Directory of Open Access Journals (Sweden)

    Caroline eDemily

    2016-02-01

    Full Text Available Attentional, visuospatial and social cognition deficits have a negative impact on children’s adaptative and social competences and, as a result, on their ability to achieve a normal functioning and behavior. Until now and despite the frequency of those deficits, there is a lack of children’s specific cognitive remediation tools specifically dedicated to attentional and visuospatial areas.The « Cognitus & Moi » program involves a variety of exercises in a paper and/or pencil (n=30 or a computerized format (n=29 and a strategy coaching approach. Each module of « Cognitus & Moi » targets a single impaired cognitive area, within the limits of cognitive domains' overlapping. The little cartoon character named Cognitus, who illustrates the program, is supposed to be very friendly and kind towards children. Cognitus will accompany them throughout the program for an effective and positive reinforcement. The main goal of « Cognitus & Moi » is to adjust to children’s difficulties in daily life. Moreover, since the cognitive remediation benefit is complex to apply in daily life, the program is based on a metacognitive strategy. After a complete neuropsychological assessment and a psychoeducational session (with the child and the parents, 16 one hour-sessions of cognitive remediation with the therapist are proposed. Each session is composed of three parts: (1 computerized tasks focusing on specific attentional or visuo-spatial components (20 minutes. The attentional module targets hearing, visual and divided attention. A double attention task is also proposed. The visuo-spatial module targets eye tracking and gaze direction, spatial orientation, visuo-spatial memory and construction, and mental imagery.(2 pen and paper tasks focusing on the same processes (20 minutes and a facial emotion recognition task.(3 a proposal of a home-based task (during 20 minutes. Weekly, specific attentional and visuo-spatial home tasks are proposed to the child and

  6. Hazardous Waste Remedial Actions Program requirements for quality control of analytical data

    International Nuclear Information System (INIS)

    Miller, M.S.; Zolyniak, J.W.

    1988-08-01

    The Hazardous Waste Remedial Action Program (HAZWRAP) is involved in performing field investigations and sample analysis pursuant to the NCP for the Department of Energy and other federal agencies. The purpose of this document is to specify the requirements for the control of the accuracy, precision and completeness of the samples, and data from the point of collection through analysis. The requirements include data reduction and reporting of the resulting environmentally related data. Because every instance and concern may not be addressed in this document, HAZWRAP subcontractors are encouraged to discuss any questions with the HAZWRAP Project Manager hereafter identified as the Project Manager

  7. Data and information management system for the ORNL (Oak Ridge National Laboratory) Remedial Action Program

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Hook, L.A.; Gentry, M.J.; Owen, P.T.; Newman, K.A.; McCord, R.A.; Faulkner, M.A.; Bledsoe, J.L.

    1988-01-01

    A Remedial Action Program (RAP) was established in FY 1985 at Oak Ridge National Laboratory (ORNL) to provide corrective measures at areas contaminated with radioactive and/or hazardous chemical wastes. To achieve this goal, numerous and varied studies are being conducted to characterize the waste disposal sites. Environmental data collected in support of other programs at ORNL are also of use to RAP. Collectively, these studies are generating a voluminous amount of data on a scale unprecedented for ORNL. A computerized Data and Information Management System (DIMS) was developed to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated sites and facilities. The current DIMS and its role in supporting RAP are described. The DIMS consists of three components: (1) the Bibliographic Data Base, (2) the Records Control Data Base, and (3) the Numeric Data Base. This paper/poster emphasizes the Numeric Data Base, including its development and organization, and also summarizes the status of other activities associated with management and use of such data (i.e., bibliographic information, records control, geographic information, and quality assurance). The types of data currently available have been summarized, and a synopsis of the contents of the RAP numeric data base has been compiled in a menu-driven program available on PC diskettes. The synopsis will be demonstrated at the conference

  8. RESULTS OF IMPLEMENTATION OF TARGET PROGRAMS ON RADIATION ACCIDENT REMEDIATION FOR THE PERIOD TO 2010 AND PROSPECTS OF FURTHER ACTIVITIES

    Directory of Open Access Journals (Sweden)

    T. A. Marchenko

    2008-01-01

    Full Text Available The report contains information about measures undertaken by the Ministry of Civil Defense and Emergencies of the Russian Federation in the framework of implementation of the state policy in the field of radiation accidents remediation. Results of works realized in the framework of target programs on remediation of radiation accidents at Chernobyl NPP and Production Association MAYAK, and on problems caused by nuclear weapon tests at Seminalatinsk test site are presented.

  9. Assurance program for remedial action (APRA) microcomputer-operated bibliography management system

    International Nuclear Information System (INIS)

    Stenner, R.D.; Washburn, D.K.; Denham, D.H.

    1985-10-01

    Pacific Northwest Laboratory (PNL) provided technical assistance to the Office of Operational Safety (OOS) in developing their Assurance Program for Remedial Action (APRA). The APRA Bibliography Management System (BMS), a microcomputer-operated system designed to file, locate and retrieve project-specific bibliographic data, was developed to manage the documentation associated with APRA. The BMS uses APRABASE, a PNL-developed computer program written in dBASE II language, which is designed to operate using the commercially available dBASE II database software. The paper describes the APRABASE computer program, its associated subprograms, and the dBASE II APRA file. Although the BMS was designed to manage APRA-associated documents, it could be easily adapted for use in handling bibliographic data associated with any project

  10. Assurance Program for Remedial Action (APRA) microcomputer-operated bibliography management system

    International Nuclear Information System (INIS)

    Stenner, R.D.; Washburn, D.K.; Denham, D.H.

    1986-01-01

    Pacific Northwest Laboratory (PNL) provided technical assistance to the Office of Operational Safety (OOS) in developing their Assurance Program for Remedial Action (APRA). The APRA Bibliography Management System (BMS), a microcomputer-operated system designed to file, locate and retrieve project-specific bibliographic data, was developed to manage the documentation associated with APRA. The BMS uses APRABASE, a PNL-developed computer program written in dBASE II/sup (b)/ language, which is designed to operate using the commercially available dBASE II database software. This paper describes the APRABASE computer program, its associated subprograms, and the dBASE II APRA file. Although the BMS was designed to manage APRA-associated documents, it could be easily adapted for use in handling bibliographic data associated with any project

  11. Radiological protection guidelines for the Formerly Utilized Sites Remedial Action Program and Remote Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Gilbert, T.L.

    1984-01-01

    The need for a definitive basis for radiological guidelines and criteria for FUSRAP became apparent by 1981 and led ORO to sponsor a joint ANL/BNI/LANL/ORO effort under the chairmanship of Wayne Hansen (LANL) that resulted in a final FUSRAP radiological guidelines document in March 1983. A separate effort to develop guidelines for remedial action criteria for SFMP was in progress at PNL. The need to coordinate both efforts with impending revisions of DOE Radiological Protection Standards and impending new developments in EPA and NRC Radiological Protection Standards led to convening of the first DOE Workshop on Remedial Action Criteria in Gaithersburg, Maryland, in February 1984, followed by a second workshop in June 1984 at ANL. The major decisions were to base the criteria on dosimetry models and basic limits currently recommended by the International Commission on Radiological Protection, to emphasize the development and use of site-specific rather than generic guidelines and criteria for residual radionuclide concentrations in the ground, and to prepare a manual to accompany the guidelines that would present procedures and tables for deriving site-specific soil guidelines and criteria for the remedial action programs. A joint ANL/LANL/ORNL/PNL effort to prepare a definitive set of guidelines and a manual has been initiated. The scope, status, and current plans for this effort, and some of the key issues, are presented. 10 references, 1 table

  12. Radiological protection guidelines for the Formerly Utilized Sites Remedial Action Program and remote Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Gilbert, T.L.

    1985-01-01

    The need for a definitive basis for radiological guidelines and criteria for FUSRAP became apparent by 1981 and led ORO to sponsor a joint ANL/BNI/LANL/ORO effort under the chairmanship of Wayne Hansen (LANL) that resulted in a final FUSRAP radiological guidelines document in March 1983. A separate effort to develop guidelines for remedial action criteria for SFMP was in progress at PNL. The need to coordinate both efforts with impending revisions of DOE Radiological Protection Standards and impending new developments in EPA and NRC Radiological Protection Standards led to convening of the first DOE Workshop on Remedial Action Criteria in Gaithersburg, Maryland, in February 1984, followed by a second workshop in June 1984 at ANL. The major decisions were to base the criteria on dosimetry models and basic limits currently recommended by the International Commission on Radiological Protection, to emphasize the development and use of site-specific rather than generic guidelines and criteria for residual radionuclide concentrations in the ground, and to prepare a manual to accompany the guidelines that would present procedures and tables for deriving site-specific soil guidelines and criteria for the remedial action programs. A joint ANL/LANL/ORNL/PNL effort to prepare a definitive set of guidelines and a manual has been initiated. The scope, status, and current plans for this effort, and some of the key issues, are presented. 10 references, 1 table

  13. Challenge of superfund community relations

    International Nuclear Information System (INIS)

    Goldman, N.J.

    1991-01-01

    Conducting a community relations effort in a community which is home to a Superfund site is a formidable challenge. Any education press, however appropriate, quickly falls victim to doubt, mistrust of fears of the very public intended to be served by the effort. While each site is uniquely different, the issues raised by affected communities in one part of the country are strikingly similar to those raised in other parts. Those most involved must join those most affected in seeking meaningful solutions and in building the trust that is so vital in moving forward with Superfund

  14. Association of General Surgery Resident Remediation and Program Director Attitudes With Resident Attrition.

    Science.gov (United States)

    Schwed, Alexander C; Lee, Steven L; Salcedo, Edgardo S; Reeves, Mark E; Inaba, Kenji; Sidwell, Richard A; Amersi, Farin; Are, Chandrakanth; Arnell, Tracey D; Damewood, Richard B; Dent, Daniel L; Donahue, Timothy; Gauvin, Jeffrey; Hartranft, Thomas; Jacobsen, Garth R; Jarman, Benjamin T; Melcher, Marc L; Mellinger, John D; Morris, Jon B; Nehler, Mark; Smith, Brian R; Wolfe, Mary; Kaji, Amy H; de Virgilio, Christian

    2017-12-01

    program, and 18 (21.2%) exited graduate medical education altogether. Each program had an annual attrition rate ranging from 0.73% to 6.0% (median [IQR], 2.5% [1.5%-3.4%]). Low-attrition programs were more likely than high-attrition programs to use resident remediation (21.0% vs 6.8%; P < .001). Median (IQR) Qualifying Examination pass rates (93% [90%-98%] vs 92% [86%-100%]; P = .92) and Certifying Examination pass rates (83% [68%-84%] vs 81% [71%-86%]; P = .47) were similar. Program directors at high-attrition programs were more likely than their counterparts at low-attrition programs to agree with this statement: "I feel that it is my responsibility as a program director to redirect residents who should not be surgeons." The overall 5-year attrition rate of 8.8% was significantly lower than previously reported. Program directors at low-attrition programs were more likely to use resident remediation. Variations in attrition may be explained by program director attitudes, although larger studies are needed to further define program factors affecting attrition.

  15. Data base management activities for the Remedial Action Program at ORNL: Calendar year 1988

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Hook, L.A.; Gentry, M.J.; McCord, R.A.; Faulkner, M.A.; Bledsoe, J.L.; Newman, K.A.; Owen, P.T.; Rosen, A.E.

    1989-04-01

    The ORNL Remedial Action Program (RAP) was established in 1985 in response to state and federal regulations mandating corrective actions at contaminated sites. To achieve this goal, numerous and varied studies are being conducted to characterize the type and extent of contamination. Environmental data collected in support of other programs at ORNL are also of use to RAP. Collectively, these studies are generating a voluminous amount of data. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. The current DIMS and its role in supporting RAP during 1988 are described. The DIMS consists of three components: (1) the Numeric Data Base, (2) the Bibliographic Data Base, and (3) the Records Control Data Base. This report addresses all three data bases, but focuses on a description of the contents of the Numeric Data Base. The types of numeric data currently available are summarized in the tables and figures. More detailed information on the contents of the RAP Numeric Data Base has been assembled in a menu-driven format on IBM PC diskettes, which are available upon request. 6 refs

  16. Alternatives for management of wastes generated by the formerly utilized sites remedial action program and supplement

    International Nuclear Information System (INIS)

    Gilbert, T.L.; Peterson, J.M.; Vocke, R.W.; Alexander, J.K.

    1983-03-01

    Alternatives for disposal or stabilization of the wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP) are identified and compared, with emphasis on the long-term aspects. These wastes consist of soil material and rubble containing trace amounts of radionuclides. A detailed pathway analysis for the dose to the maximally exposed individual is carried out using an adaptation of the natural analogue method. Comparisons of the different alternatives, based on the results of the pathway analysis and qualitative cost considerations, indicate that, if the hazard is such that the wastes must be removed and disposed of rather than stabilized in place, disposal by immediate dispersal is preferable to containment, and containment followed by slow planned dispersal is preferable to containment without dispersal. The Supplement presents refinements of work that was reported at the 1982 International Decommissioning Symposium. The new material consists of revisions of the estimates of the predicted potential dose to the maximally exposed individual and a more detailed comparative assessment of the radiological impacts of alternatives for management of wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP)

  17. New York state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying our the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New York. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  18. New Mexico state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  19. New Mexico state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Informaion Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  20. New York state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New York. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  1. New Mexico state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  2. The Expedited Remedial Action Program: A case study. The Alhambra Front Street manufactured gas plant site

    Energy Technology Data Exchange (ETDEWEB)

    Padleschat, J.A.; McMahon, T.D.

    1996-12-31

    Early in 1995, the Department of Toxic Substances Control asked Southern California Gas Company (SoCalGas) to enter one of its manufactured gas plant (MGP) sites into the new Expedited Remedial Action Program (ERAP). SoCalGas initially was not enthusiastic about the new program. Nevertheless, SoCalGas submitted an application for its Alhambra MGP site to be selected for the ERAP. The Alhambra Site was accepted into ERAP in November 1995, and was the first ERAP site to have orphan shares. MGP sites are well suited to the ERAP. They often involve few potentially responsible parties and can be expected to have the same primary contaminants: polycyclic aromatic hydrocarbons (PAH), which are a byproduct of the gas manufacturing process, and petroleum hydrocarbons from the crude oil feedstock used to manufacture the gas.

  3. Environmental and radiological remediation under Canada's global partnership program 2004-11 - 59185

    International Nuclear Information System (INIS)

    Washer, Michael J.

    2012-01-01

    Following the '911' attack on the USA in 2001 the international community under Canada's G8 leadership established a $20 billion Global Partnership initiative in 2002 to collaboratively address threats to global security posed by the proliferation and potential terrorist use of Weapons and Materials of Mass Destruction (WMMD) and related materials and knowledge. This major international initiative addressed four priority areas: (1) Chemical Weapon Destruction (2) Nuclear powered submarine eliminations (3) Nuclear and radiological security; and (4) Employment for former weapon scientists. Additionally the initiative has addressed Biological Non- Proliferation. Canada's execution of all these program areas has resulted in substantial environmental benefits aside from the eradication and securing of WMMD. This paper reviews the environmental and radiological remediation achievements of the four primary Global Partnership program areas addressed under Canadian funding 2004 through 2011. (author)

  4. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  5. New York state information handbook formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying our the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New York. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  6. New Mexico state information handbook formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Informaion Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  7. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  8. Effectiveness of a self-regulated remedial program for handwriting difficulties.

    Science.gov (United States)

    Van Waelvelde, Hilde; De Roubaix, Amy; Steppe, Lien; Troubleyn, Evy; De Mey, Barbara; Dewitte, Griet; Debrabant, Julie; Van de Velde, Dominique

    2017-09-01

    Handwriting difficulties may have pervasive effects on a child's school performance. I Can! is a remedial handwriting program with a focus on self-regulated learning and applying motor learning principles combined with a behavioural approach. It is developed for typically developing children with handwriting problems. The study aim was to evaluate the program's effectiveness. Thirty-one children aged 7-8 year participated in a cross-over study. Handwriting quality and speed were repeatedly assessed by means of the Systematic Screening of Handwriting Difficulties test. Difficulties addressed were fluency in letter formation, fluency in letter connections, letter height, regularity of letter height, space between words, and line path. Mixed model analysis revealed improved quality of writing and speed for all children but significantly more improvement in handwriting quality for the children participating in the program. Although writing speed improved over time, no additional effects of the program occurred. 'I Can!' is found to be an effective instructive program to ameliorate handwriting quality in typically developing children with handwriting difficulties. The program's success was by a therapy burst of only 7 weeks focusing on the child's self-regulated learning capacities, within an individualized education plan according to their needs and goals.

  9. In Situ Remediation Integrated Program: Evaluation and assessment of containment technology

    International Nuclear Information System (INIS)

    Gerber, M.A.; Fayer, M.J.

    1994-06-01

    Containment technology refers to a broad range of methods that are used to contain waste or contaminated groundwater and to keep uncontaminated water from entering a waste site. The U.S. Department of Energy's (DOE) Office of Technology Development has instituted the In Situ Remediation Integrated Program (ISRIP) to advance the state-of-the-art of innovative technologies that contain or treat, in situ, contaminated media such as soil and groundwater, to the point of demonstration and to broaden the applicability of these technologies to the widely varying site remediation requirements throughout the DOE complex. The information provided here is an overview of the state-of-the-art of containment technology and includes a discussion of ongoing development projects; identifies the technical gaps; discusses the priorities for resolution of the technical gaps; and identifies the site parameters affecting the application of a specific containment method. The containment technology described in this document cover surface caps; vertical barriers such as slurry walls, grout curtains, sheet pilings, frozen soil barriers, and vitrified barriers; horizontal barriers; sorbent barriers; and gravel layers/curtains. Within DOE, containment technology could be used to prevent water infiltration into buried waste; to provide for long-term containment of pits, trenches, and buried waste sites; for the interim containment of leaking underground storage tanks and piping; for the removal of contaminants from groundwater to prevent contamination from migrating off-site; and as an interim measure to prevent the further migration of contamination during the application of an in situ treatment technology such as soil flushing. The ultimate goal is the implementation of containment technology at DOE sites as a cost-effective, efficient, and safe choice for environmental remediation and restoration activities

  10. Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations

    International Nuclear Information System (INIS)

    1993-03-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program adopted a Pollution Prevention Program in March 1991. The program's mission is to minimize waste and prevent pollution in remedial investigations (RI), feasibility studies (FS), decontamination and decommissioning (D ampersand D), and surveillance and maintenance (S ampersand M) site program activities. Mission success will result in volume and/or toxicity reduction of generated waste. Energy Systems is producing a fully developed a Numerical Scoring System (NSS) and actually scoring the generators of Investigation Derived Waste (IDW) at six ER sites: Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, the Oak Ridge K-25 site, Paducah Gaseous Diffusion Plant (Paducah), and Portsmouth Uranium Enrichment Complex (Portsmouth). This report summarizes the findings of this initial numerical scoring evaluation and shows where improvements in the overall ER Pollution prevention program may be required. This report identifies a number of recommendations that, if implemented, would help to improve site-performance measures. The continued development of the NSS will support generators in maximizing their Pollution Prevention/Waste Minimization efforts. Further refinements of the NSS, as applicable suggest comments and/or recommendations for improvement

  11. Data base management activities for the Remedial Action Program at Oak Ridge National Laboratories (ORNL)

    Energy Technology Data Exchange (ETDEWEB)

    Hook, L.A.; Voorhees, L.D.; Gentry, M.J.; Faulkner, M.A.; Shaakir-Ali, J.A.; Newman, K.A.; McCord, R.A.; Goins, L.F.; Owen, P.T.

    1990-07-01

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP) was established in 1985 in response to state and federal regulations requiring comprehensive control over facility discharges and cleanup of contaminated sites. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. The current status of DIMS and its role in supporting RAP during 1989 are described. The DIMS consists of three components: (1) the Numeric Data Base, (2) the Bibliographic Data Base, and (3) the Records Control Data Base. This report addresses all three data bases, but focuses on the contents of the Numeric Data Base. Significant progress was made last year with the geographic information system (GIS) and ARC/INFO, which can be interfaced with SAS/GRAPH to provide combined mapping and statistical graphic products. Several thematic layers of GIS data for the Oak Ridge Reservation are now available. 18 refs., 8 figs., 19 tabs.

  12. Formerly utilized MED/AEC sites remedial action program post-remedial-action radiological survey of Kent Chemical Laboratory, the University of Chicago, Chicago, IL

    International Nuclear Information System (INIS)

    Wynveen, R.A.; Smith, W.H.; Sholeen, C.M.; Justus, A.L.; Flynn, K.F.

    1983-05-01

    A comprehensive radiological assessment of Kent Laboratory was conducted during September 1977, by the ANL Radiological Survey Group to determine if any radioactive contamination remained. The results of the assessment indicated the need for remedial action. Since 1977, the University has decontaminated this laboratory building, and in May 1983, the Department of Energy requested the ANL Radiological Survey Group to conduct a post-remedial-action survey. All the contaminated areas identified during the 1977 assessment were rechecked. Contamination remained in six of the rooms. Further decontamination of these areas was conducted by university personnel, and as a result, these areas are now free of contamination. However, a contaminated clay pipe in the attic remained. The clay pipe has since been removed and disposed of as solid radioactive waste. During the post-remedial-action survey, six soil samples were collected from excavation trenches dug in Rooms 1 and 2 as part of the University's remedial action efforts. Also, four sludge samples were taken from below the manhole covers in the basement of Kent Chemical Laboratory to assess the radiological condition of the sewer system. A radiological assessment of the sewer system had not been accomplished during the 1977 survey as per program direction. Radiochemical (fluorometric) and gamma-spectral analyses indicated that eight out of ten soil and sludge samples contained levels of radioactivity above expected background concentrations. The soil has since been further excavated. The building is now free of radioactive contamination in excess of background levels; however, the sewers do contain radioactive materials above background levels since contamination was found at appropriate access points. 6 references, 16 figures, 7 tables

  13. Update on the National Groundwater and Soil Remediation Program (GASReP)

    International Nuclear Information System (INIS)

    Lye, A.

    1992-01-01

    The national Groundwater and Soil Remediation Program (GASReP), supported jointly by government and the petroleum industry, targets research on innovative ways to clean up groundwater and soil contaminated with petroleum hydrocarbons, and conducts technology transfer sessions. Within its broad context as an initiative for research, development and demonstration of innovative cleanup technologies, GASReP now targets basic applied research and/or technology development only. Industry partners and other government programs will be encouraged to extend GASReP research findings to the final stage of technology demonstration. During 1991-92 GASReP shifted its attention from starting new projects to evaluating the program, setting a new direction, and establishing a better way to seek ideas for projects. Unlike previous years, only three projects began during this period. Two technology development projects are iron and manganese pre-treatment for pump and treat clean-up systems, and surface bioreactor to clean soil/waste contaminated with petroleum hydrocarbons. The one technology assessment project dealt with a review of six technologies for in-situ bioremediation of BTEX (benzene, toluene, ethylbenzene, xylene) in groundwater. Current program direction, interests, and research needs are summarized, and candidate proposals for project selection in 1992-93 are listed

  14. Overview of decommissioning and decontamination technical information support activities funded by the US Department of Energy's remedial action programs

    International Nuclear Information System (INIS)

    Owen, P.T.

    1986-01-01

    In 1979 the US Department of Energy (DOE) established the Remedial Action Program Information Center (RAPIC) at the Oak Ridge National Laboratory to provide technical information support to the Surplus Facilities Management Program, DOE's national decommissioning and decontamination (D and D) program which is managed by DOE's Richland Operations Office and UNC Nuclear Industries, Inc., and to the other DOE remedial action programs. Specific information activities that RAPIC performs to support the DOE's programs and the D and D community include: maintaining a computerized bibliographic database containing about 4500 annotated citations (about 2000 on D and D) and a database of 1800 contacts involved with remedial action work at radioactively contaminated sites; publishing an annual bibliography, ''Nuclear Facility Decommissioning and Site Remedial Actions, A Selected Bibliography,'' ORNL/EIS-154 (six volumes published); maintaining a document repository and providing copies of requested publications; and performing manual and computerized searches of the technical literature. The most significant RAPIC function is serving as a focal point for D and D information. With the extensive resources at its command, RAPIC is in a unique position to provide a comprehensive information base to the D and D community. DOE makes these services available to foster good public relations and promote cooperation and information exchange

  15. SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM Evaluation of Soil Amendment Technologies at the Crooksville/RosevillePottery Area of Concern Rocky Mountain Remediation ServicesEnvirobond™ Process

    Science.gov (United States)

    RMRS developed the Envirobond™ process to treat heavy metals in soil.This phosphate-based technology consists of a proprietary powder and solution that binds with metals in contaminated waste. RMRS claims that the Envirobond™ process converts metal contaminants from their leach...

  16. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    Energy Technology Data Exchange (ETDEWEB)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  17. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    International Nuclear Information System (INIS)

    Ewy, Ann; Hays, David

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  18. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — National Priorities List (NPL) Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access...

  19. CERCLIS (Superfund) ASCII Text Format - CPAD Database

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database (CPAD) contains a selected set...

  20. Superfund Site Information - Site Sampling Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes Superfund site-specific sampling information including location of samples, types of samples, and analytical chemistry characteristics of...

  1. Feasibility of group Cognitive Remediation Therapy in an adult eating disorder day program in New Zealand.

    Science.gov (United States)

    Roberts, Marion E

    2018-05-02

    To explore the feasibility of integrating group Cognitive Remediation Therapy (gCRT) into an eating disorder day program in Auckland, New Zealand. A consecutive series of 28 patients took part over an 8-month period in the context of a service audit. Main outcome measures were the Detail and Flexibility Questionnaire (DFlex) and qualitative feedback from patients. Significant shifts in self-report inefficient cognitive style were observed pre/post gCRT with large effect sizes (Cohen's d av ) for both cognitive rigidity and attention to detail outcomes. Patient feedback was positive, with themes of enjoyment, increased insight, and positive social interaction/esteem boosting in the context of the group emerging. Support for the acceptability, adaptation, expansion, practicality, and limited-efficacy testing of gCRT in an Australasian day program setting has been found, suggesting integration of this module into existing day treatment programs is merited. Larger scale trials may help delineate the clinical characteristics of good responders. Copyright © 2018. Published by Elsevier Ltd.

  2. Remediation in Canadian medical residency programs: Established and emerging best practices.

    Science.gov (United States)

    Shearer, Cindy; Bosma, Mark; Bergin, Fiona; Sargeant, Joan; Warren, Andrew

    2018-02-23

    Policies to guide remediation in postgraduate medical education exist in all Canadian medical schools. This study examines concordance between these policies and processes, and published "best practices" in remediation. We conducted a literature review to identify best practices in the area of remediation. We then reviewed remediation policies from all 13 English medical schools in Canada other than our own and conducted interviews with key informants from each institution. Each policy and interview transcript pair was then reviewed for evidence of pre-defined "best practices." Team members also noted additional potential policy or process enablers of successful remediation. Most policies and processes aligned with some but not all published best practices. For instance, all participating schools tailored remediation strategies to individual resident needs, and a majority encouraged faculty-student relationships during remediation. Conversely, few required the teaching of goal-setting, strategic planning, self-monitoring, and self-awareness. In addition, we identified avoidance of automatic training extension and the use of an educational review board to support the remediation process as enablers for success. Remediation policies and practices in Canada align well with published best practices in this area. Based on key informant opinions, flexibility to avoid training extension and use of an educational review board may also support optimal remediation outcomes.

  3. Enhanced monitoring of hazardous waste site remediation: Electrical conductivity tomography and citizen monitoring of remediation through the EPA's community advisory group program

    Science.gov (United States)

    Hort, Ryan D.

    conductivity could not be related to concentrations of permanganate or reaction products. Additionally, EPA Superfund sites participating in the Community Advisory Group (CAG) program were examined to determine how communities may have benefitted from the program. While CAG participation was correlated with slower achievement of EPA cleanup milestones, many CAGs successfully achieved five standardized social goals. CAGs that achieved these social goals varied in composition but were similar in their focus on community outreach and ability to extend their influence beyond CAG meetings.

  4. Region 9 NPL Sites (Superfund Sites 2013)

    Science.gov (United States)

    NPL site POINT locations for the US EPA Region 9. NPL (National Priorities List) sites are hazardous waste sites that are eligible for extensive long-term cleanup under the Superfund program. Eligibility is determined by a scoring method called Hazard Ranking System. Sites with high scores are listed on the NPL. The majority of the locations are derived from polygon centroids of digitized site boundaries. The remaining locations were generated from address geocoding and digitizing. Area covered by this data set include Arizona, California, Nevada, Hawaii, Guam, American Samoa, Northern Marianas and Trust Territories. Attributes include NPL status codes, NPL industry type codes and environmental indicators. Related table, NPL_Contaminants contains information about contaminated media types and chemicals. This is a one-to-many relate and can be related to the feature class using the relationship classes under the Feature Data Set ENVIRO_CONTAMINANT.

  5. From theory to PrACTice: a cognitive remediation program based on a neuropsychological model of schizophrenia

    Directory of Open Access Journals (Sweden)

    Delphine eFabre

    2015-12-01

    Full Text Available Cognitive dysfunction is one of the hallmark deficits of schizophrenia. A wide range of studies illustrate how it is strongly interconnected to clinical presentation and daily life functioning (see Green, 1996 and Green et al., 2000. Hence, cognition is an important treatment target in schizophrenia. To address the challenge of cognitive enhancement in schizophrenia, a large number of cognitive remediation programs have been developed and evaluated over the past several decades. First, an overview of these programs is presented highlighting their specificity to cognitive deficit in schizophrenia using an integrated method. In this case, cognitive training focuses on enhancing several elementary cognitive functions considered as a prerequisite to social skills or vocational training modules. These programs are based on the neurodevelopmental hypothesis of schizophrenia. However, moderate improvement for patients who benefit from these therapies has been observed as described in Wykes et al review (2011. Next, neuropsychological models of schizophrenia are then presented. They highlight the critical role of the internally generated intentions in appropriate willful actions. The cognitive control mechanism deals with this ability. Interestingly, available cognitive remediation programs have not been influenced by these models. Hence, we propose another alternative to set up a specific cognitive remediation program for schizophrenia patients by targeting the cognitive control mechanism. We describe the PrACTice program which is in the process of being validated.

  6. Final report of the systems engineering technical advisory board for the Tank Waste Remediation Program

    Energy Technology Data Exchange (ETDEWEB)

    Baranowski, F.P.; Goodlett, C.B.; Beard, S.J.; Duckworth, J.P.; Schneider, A.; Zahn, L.L.

    1993-03-01

    The Tank Waste Remediation System (TWRS) is one segment of the environmental restoration program at the Hanford site. The scope is to retrieve the contents of both the single shell and double shell tanks and process the wastes into forms acceptable for long term storage and/or permanent disposal. The quantity of radioactive waste in tanks is significantly larger and substantially more complex in composition than the radioactive waste stored in tanks at other DOE sites. The waste is stored in 149 single shell tanks and 28 double shell tanks. The waste was produced over a period from the mid 1940s to the present. The single shell tanks have exceeded their design life and are experiencing failures. The oldest of the double shell tanks are approaching their design life. Spar double shell tank waste volume is limited. The priorities in the Board`s view are to manage safely the waste tank farms, accelerate emptying of waste tanks, provide spare tank capacity and assure a high degree of confidence in performance of the TWRS integrated program. At its present design capacity, the glass vitrification plant (HWVP) will require a period of about 15 years to empty the double shell tanks; the addition of the waste in single shell tanks adds another 100 years. There is an urgent need to initiate now a well focused and centralized development and engineering program on both larger glass melters and advanced separations processes that reduce radioactive constituents in the low-level waste (LLW). The Board presents its conclusions and has other suggestions for the management plan. The Board reviews planning schedules for accelerating the TWRS program.

  7. Final report of the systems engineering technical advisory board for the Tank Waste Remediation Program

    International Nuclear Information System (INIS)

    Baranowski, F.P.; Goodlett, C.B.; Beard, S.J.; Duckworth, J.P.; Schneider, A.; Zahn, L.L.

    1993-03-01

    The Tank Waste Remediation System (TWRS) is one segment of the environmental restoration program at the Hanford site. The scope is to retrieve the contents of both the single shell and double shell tanks and process the wastes into forms acceptable for long term storage and/or permanent disposal. The quantity of radioactive waste in tanks is significantly larger and substantially more complex in composition than the radioactive waste stored in tanks at other DOE sites. The waste is stored in 149 single shell tanks and 28 double shell tanks. The waste was produced over a period from the mid 1940s to the present. The single shell tanks have exceeded their design life and are experiencing failures. The oldest of the double shell tanks are approaching their design life. Spar double shell tank waste volume is limited. The priorities in the Board's view are to manage safely the waste tank farms, accelerate emptying of waste tanks, provide spare tank capacity and assure a high degree of confidence in performance of the TWRS integrated program. At its present design capacity, the glass vitrification plant (HWVP) will require a period of about 15 years to empty the double shell tanks; the addition of the waste in single shell tanks adds another 100 years. There is an urgent need to initiate now a well focused and centralized development and engineering program on both larger glass melters and advanced separations processes that reduce radioactive constituents in the low-level waste (LLW). The Board presents its conclusions and has other suggestions for the management plan. The Board reviews planning schedules for accelerating the TWRS program

  8. Superfund Programmatic Information

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes an inventory of program policy and guidance documents that are used by the EPA regions, states, tribes and private parties to implement the...

  9. Radiological guidelines for application to DOE's Formerly Utilized Sites Remedial Action Program. [FUSRAP sites

    Energy Technology Data Exchange (ETDEWEB)

    1983-03-01

    The US Department of Energy has implemented a program to evaluate and, where necessary, take action to protect the public from contamination at sites that were used in the past to process and/or store radioactive materials for the former US Army Corps of Engineers Manhattan Engineer District or the US Atomic Energy Commission. The program is identified as the Formerly Utilized Sites Remedial Action Program (FUSRAP). This document describes methods considered appropriate for the evaluation of health effects that might possible be caused by radioactive contamination at FUSRAP sites. This assessment methodology is applied to a typical site for the purposeof deriving guidelines for the cleanup of contaminated soil. Additional guidance is provided for planning site-specific remedial action that is consistent with the overall objectives of FUSRAP.

  10. Public values related to decisions in the Tank Waste Remediation System Program

    International Nuclear Information System (INIS)

    Armacost, L.L.; Robershotte, M.; von Winterfeldt, D.; Creighton, J.

    1994-10-01

    Managers of the Tank Waste Remediation System (TWRS) Program have to make numerous decisions, ranging from the strategic decisions on the fundamental tank cleanup goals to technical decisions on which types of equipment to use in mechanical retrieval of wastes. Furthermore, many of these decisions have to be made repeatedly (e.g., the annual allocation of research and development funds to TWRS activities). These decisions have many potential consequences in terms of risks to workers, risks to the public, environmental impacts, and economic development and cost. Because these consequences affect the values of many parties, the consequences need to be evaluated in terms that are accepted and understood by the interested parties. Therefore, an effort needs to be made to incorporate public concerns and values into the TWRS decision-making process. The purpose of this report is to review and integrate this past work on values and to create a maser list of values in order to create a consistent value framework for the numerous TWRS decisions; efficiently and effectively use public values in the decision-making process by updating this report on a regular basis to ensure that the information represents the public's current views; provide guidance about using values in technical TWRS decisions

  11. E-FUSRAP: AUTOMATING THE CASE FILE FOR THE FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

    International Nuclear Information System (INIS)

    Mackenzie, D.; Marshall, K.

    2003-01-01

    The Department of Energy's (DOE) Office of Site Closure, EM-30, houses the document library pertaining to sites that are related to the Formerly Utilized Sites Remedial Action Program (FUSRAP) and regularly addresses ongoing information demands, primarily from Freedom of Information Act (FOIA) requests, interested members of the public, the DOE, and other Federal Agencies. To address these demands more efficiently, DOE has begun to implement a new multi-phase, information management process known as e-FUSRAP. The first phase of e-FUSRAP, the development of the Considered Sites Database, summarizes and allows public access to complex information on over 600 sites considered as candidates for FUSRAP. The second phase of e-FUSRAP, the development of the Document Indexing Database, will create an internal index of more than 10,000 documents in the FUSRAP library's case file, allowing more effective management and retrieval of case file documents. Together, the phases of e-FUSRAP will allow EM-30 to become an innovative leader in enhancing public information sources

  12. E-FUSRAP: AUTOMATING THE CASE FILE FOR THE FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    Mackenzie, D.; Marshall, K.

    2003-02-27

    The Department of Energy's (DOE) Office of Site Closure, EM-30, houses the document library pertaining to sites that are related to the Formerly Utilized Sites Remedial Action Program (FUSRAP) and regularly addresses ongoing information demands, primarily from Freedom of Information Act (FOIA) requests, interested members of the public, the DOE, and other Federal Agencies. To address these demands more efficiently, DOE has begun to implement a new multi-phase, information management process known as e-FUSRAP. The first phase of e-FUSRAP, the development of the Considered Sites Database, summarizes and allows public access to complex information on over 600 sites considered as candidates for FUSRAP. The second phase of e-FUSRAP, the development of the Document Indexing Database, will create an internal index of more than 10,000 documents in the FUSRAP library's case file, allowing more effective management and retrieval of case file documents. Together, the phases of e-FUSRAP will allow EM-30 to become an innovative leader in enhancing public information sources.

  13. Supplemental Assessment of the Y-12 Groundwater Protection Program Using Monitoring and Remediation Optimization System Software

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental LLC; GSI Environmental LLC

    2009-01-01

    A supplemental quantitative assessment of the Groundwater Protection Program (GWPP) at the Y-12 National Security Complex (Y-12) in Oak Ridge, TN was performed using the Monitoring and Remediation Optimization System (MAROS) software. This application was previously used as part of a similar quantitative assessment of the GWPP completed in December 2005, hereafter referenced as the 'baseline' MAROS assessment (BWXT Y-12 L.L.C. [BWXT] 2005). The MAROS software contains modules that apply statistical analysis techniques to an existing GWPP analytical database in conjunction with hydrogeologic factors, regulatory framework, and the location of potential receptors, to recommend an improved groundwater monitoring network and optimum sampling frequency for individual monitoring locations. The goal of this supplemental MAROS assessment of the Y-12 GWPP is to review and update monitoring network optimization recommendations resulting from the 2005 baseline report using data collected through December 2007. The supplemental MAROS assessment is based on the findings of the baseline MAROS assessment and includes only the groundwater sampling locations (wells and natural springs) currently granted 'Active' status in accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP). The results of the baseline MAROS assessment provided technical rationale regarding the 'Active' status designations defined in the MOP (BWXT 2006). One objective of the current report is to provide a quantitative review of data collected from Active but infrequently sampled wells to confirm concentrations at these locations. This supplemental MAROS assessment does not include the extensive qualitative evaluations similar to those presented in the baseline report.

  14. Comprehensive Assessment of Struggling Learners Referred to a Graduate Medical Education Remediation Program.

    Science.gov (United States)

    Warburton, Karen M; Goren, Eric; Dine, C Jessica

    2017-12-01

    Implementation of the Next Accreditation System has provided a standardized framework for identifying learners not meeting milestones, but there is as yet no corresponding framework for remediation. We developed a comprehensive assessment process that allows correct diagnosis of a struggling learner's deficit(s) to promote successful remediation. At the University of Pennsylvania, resident learners within the Department of Medicine who are not meeting milestones are referred to the Early Intervention Remediation Committee (EIRC). The EIRC, composed of 14 faculty members with expertise in remediation, uses a standardized process to assess learners' deficits. These faculty members categorize primary deficits as follows: medical knowledge, clinical reasoning, organization and efficiency, professionalism, and communication skills. The standardized process of assessment includes an analysis of the learner's file, direct communication with evaluators, an interview focused on learner perception of the problem, screening for underlying medical or psychosocial issues, and a review of systems for deficits in the 6 core competencies. Participants were surveyed after participating in this process. Over a 2-year period, the EIRC assessed and developed remediation plans for 4% of learners (14 of a total 342). Following remediation and reassessment, the identified problems were satisfactorily resolved in all cases with no disciplinary action. While the process was time intensive, an average of 45 hours per learner, the majority of faculty and residents rated it as positive and beneficial. This structured assessment process identifies targeted areas for remediation and adds to the tools available to Clinical Competency Committees.

  15. Records Management in the Formerly Used Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    Morekas, G.N.; Pape, M.B.

    2006-01-01

    The U.S. Army Corps of Engineers' (USACE's) performance of site investigation and remediation under the Formerly Used Sites Remedial Action Program (FUSRAP) requires the use of a records management system in order to effectively capture and manage data, document the decision making process, and allow communication of project information to regulators, congress, and the public. The USACE faces many challenges in managing the vast amount of data, correspondence, and reports generated under this program, including: management of data and reports in a variety of paper, electronic, and microfilm formats; incorporation of records generated by the Department of Energy (DOE) prior to 1997; ensuring smooth flow of information among numerous internal Project Managers and regulators; and facilitating public access to information through the development of CERCLA Administrative Records and response to Freedom of Information Act (FOIA) requests. In 2004-2005, the USACE Buffalo District contracted with Dynamac Corporation to adapt the records management system developed for the Formerly Used Defense Sites (FUDS) Program to the records for the Luckey and Painesville FUSRAP sites. The system, known as the FUDS Information Improvement Plan (FIIP), was jointly developed by the USACE Hazardous, Toxic, and Radioactive Waste Center of Expertise (HTRW-CX), USACE Rock Island District, and several FUDS contractors (including Dynamac Corporation) in 2003. The primary components of the FIIP which address the challenges faced by the FUSRAP Program include: the development of a standardized document organization system; the standardization of electronic conversion processes; the standardization of file naming conventions; and the development of an automated data capture system to speed the process and reduce errors in indexing. The document organization system allows for the assignment of each individual document to one of approximately 150 categories. The categories are based upon a

  16. Value tradeoffs for the Hanford Tank Waste Remediation System (TWRS) program

    Energy Technology Data Exchange (ETDEWEB)

    Keeney, R.L.; Winterfeldt, D. von [Decision Insights, Inc., Irvine, CA (United States)

    1997-09-01

    The Tank Waste Remediation System (TWRS) program at the Hanford Site of the Department of Energy has adopted a logical approach to making decisions that uses decision analysis to structure and analyze decision alternatives and public values to evaluate them. This report is the third in a series to support this effort. The first identified a set of objectives (called {open_quotes}ends objectives{close_quotes}) that characterize the ultimate goals and desires of Hanford decision makers and stakeholders. The second report developed operational measures for these ends objectives (called {open_quotes}ends measures{close_quotes}) and it also developed a set of performance objectives and associated performance measures that are more directly related to how well decision alternatives in the TWRS program perform to achieve the ends objectives. The present report describes the development of quantitative value tradeoffs for both the ends measures and the performance measures. First, five national value experts were interviewed to obtain value tradeoffs for units of the ends measures identified in Keeney and von Winterfeldt (1996). The results of this assessment are shown in Table S1. Second, the implied value tradeoffs for the units of the performance measures were calculated from the value tradeoffs for units of the ends measures provided by the national experts. When calculating the value tradeoffs for the units of the performance measures, very simple quantitative relationships between ends and performance measures were assumed. The results of this calculation are shown in Table S2. The results of this report shown in Tables S1 and S2 should be considered preliminary and largely illustrative of the principles for developing value tradeoffs. The report lists several important caveats and recommendations for how future work can improve on the assessment of value tradeoffs.

  17. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Appendix A

    International Nuclear Information System (INIS)

    1995-09-01

    This document is a compilation of data relating to the Tank Waste Remediation System Multi-Year Program. Topics discussed include: management systems; waste volume, transfer and evaporation management; transition of 200 East and West areas; ferricyanide, volatile organic vapor, and flammable gas management; waste characterization; retrieval from SSTs and DSTs; heat management; interim storage; low-level and high-level radioactive waste management; and tank farm closure

  18. Inactive Tanks Remediation Program Batch I, Series I tanks 3001-B, 3004-B, 3013, and T-30 technical memorandum. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-05-01

    This technical memorandum provides information that can be used to make decisions concerning the disposition of four inactive tank systems that have been designated Batch 1, Series 1, by the Inactive Tanks Remediation Program team. The Batch I, Series 1, tanks are 3001-B, 3004-B, 3013, and T-30. The report offers viable alternatives for tank system disposition. The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facility Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by DOE's Oak Ridge Operations Office, the US Environmental Protection Agency-Region IV, and the Tennessee Department of Environment and Conservation. The effective date of the FFA is January 1, 1992. One objective of the FFA is to ensure that inactive liquid low-level radioactive waste tank systems are evaluated and, if appropriate, remediated through the CERCLA process. The Inactive Tanks Remediation Program and the Gunite and Associated Tanks Project (GAAT) are the two efforts that will meet this FFA objective. This memorandum addresses tank systems within the Inactive Tanks Remediation Program. Separate CERCLA documentation addresses the tank systems within the GAAT Project

  19. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    International Nuclear Information System (INIS)

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future

  20. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    Energy Technology Data Exchange (ETDEWEB)

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future.

  1. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  2. Briefing paper -- Remedial Action Assessment System

    International Nuclear Information System (INIS)

    Buelt, J.L.

    1990-04-01

    Congress has mandated a more comprehensive management of hazardous wastes with the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or ''Superfund'') and the Superfund Amendment and Reauthorization Act (SARA). This mandate includes restoration of disposal sites contaminated through past disposal practices. This mandate applies to facilities operated for and by the Department of Energy (DOE), just as it does to industrial and other institutions. To help implement the CERCLA/SARA remedial investigation and feasibility study (RI/FS) process in a consistent, timely, and cost-effective manner, a methodology needs to be developed that will allow definition, sorting, and screening of remediation technologies for each operable unit (waste site). This need is stated specifically in Section 2.2.2.1 of the October 1989 Applied Research, Development, Demonstration, Testing, and Evaluation (RDDT ampersand E) Plan of the DOE. This Briefing Paper is prepared to respond to this need. 1 fig

  3. A successful environmental remediation program closure and post-closure activities (CAPCA) Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Bowers, M.H.

    1991-01-01

    The Resource Conservation and Recovery Act (RCRA) closure of eleven waste management units at the Department of Energy's (DOE's) Oak Ridge Y-12 Plant is nearing completion. The Oak Ridge Y-12 Plant is managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy under Contract DE-AC05-84OR21400. The Closure and Post Closure Program (CAPCA) has been accomplished on an accelerated schedule through the efforts of a dedicated team from several organizations. This paper relates experience gained from the program that can be of benefit on other DOE environmental remediation projects. Technical design and construction aspects, as well as project management considerations, are discussed

  4. Integrated program management for major nuclear decommissioning and environmental remediation projects - 59068

    International Nuclear Information System (INIS)

    Lehew, John

    2012-01-01

    Document available in abstract form only. Full text of publication follows: CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy's (DOE) contractor responsible for the safe, environmental cleanup of the Hanford Sites Central Plateau, sections of the Columbia River Corridor and the Hanford Reach National Monument. The 586-square-mile Hanford Site is located along the Columbia River in southeastern Washington, U.S.A. A plutonium production complex, housing the largest volume of radioactive and contaminated waste in the nation, with nine nuclear reactors and associated processing facilities, Hanford played a pivotal role in the nation's defense for more than 40 years, beginning in the 1940's with the Manhattan Project. Today, under the direction of the DOE, Hanford is engaged in one of the world's largest environmental cleanup project. The Plateau Remediation Contract is a 10-year project paving the way for closure of the Hanford Site. The site through its location, climate, geology and proximity to the Columbia River in combination with the results of past nuclear operations presents a highly complex environmental remediation challenge. The complexity is not only due to the technical issues associated with decommissioning nuclear facilities, remediating soil contamination sites, dispositioning legacy waste and fuel materials and integrating these with the deep vadose zone and groundwater remediation

  5. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1992-12-01

    This fourteenth annual status report for the Uranium Mill Tailings Remedial Action (UMTRA) Project Office summarizes activities of the Uranium Mill Tailings Remedial Action Surface (UMTRA-Surface) and Uranium Mill Tailings Remedial Action Groundwater (UMTRA-Groundwater) Projects undertaken during fiscal year (FY) 1992 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1993 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604. The DOE will continue to submit annual reports to DOE-Headquarters, the states, tribes, and local representatives through Project completion in order to inform the public of the yearly Project status. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive material (RRM) located on the inactive uranium processing sites in a safe and environmentally sound manner, and to minimize or eliminate potential health hazards. Commercial and residential properties near designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties (VP),'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated VPs located in 10 states, and the VPs associated with the Edgemont, South Dakota, uranium mill currently owned by the Tennessee Valley Authority (TVA) (Figure A.1, Appendix A)

  6. Superfund National Priority List (NPL) Site Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — A set of site boundaries for each site in EPA Region 1 (Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont) on EPA's Superfund National...

  7. Sitewide soil and debris management program for a DOE site under remediation

    International Nuclear Information System (INIS)

    Harvey, B.F.

    1993-01-01

    In 1986, the United States Department of Energy (DOE) and the United States Environmental Protection Agency (US EPA) entered into a Federal Facility Compliance Agreement (FFCA). The agreement included provisions to investigate and define the nature and extent of contamination and to determine the necessity for remediation at the Fernald Environmental Management Project (FEMP) near Cincinnati, Ohio. The agreement is also pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Uranium enrichment production activities at the facility ceased in 1989. The FEMP mission is now environmental clean-up and remediation under the management of the Fernald Environmental Restoration Management Corporation. This report describes objectives and activities of remediation efforts at FEMP

  8. Remediating MGP brownfields

    International Nuclear Information System (INIS)

    Larsen, B.R.

    1997-01-01

    Before natural gas pipelines became widespread in this country, gas fuel was produced locally in more than 5,000 manufactured gas plants (MGPs). The toxic wastes from these processes often were disposed onsite and have since seeped into the surrounding soil and groundwater. Although the MGPs--commonly called gas plants, gas-works or town gas plants--have closed and most have been demolished, they have left a legacy of environmental contamination. At many MGP sites, underground storage tanks were constructed of wood or brick, with process piping and equipment which frequently leaked. Waste materials often were disposed onsite. Releases of coal tars, oils and condensates produced within the plants contributed to a wide range of contamination from polycyclic aromatic hydrocarbons, phenols, benzene and cyanide. Remediation of selected MGP sites has been sporadic. Unless the site has been identified as a Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) Superfund site, the regulatory initiative to remediate often remains with the state in which the MGP is located. A number of factors are working to change that picture and to create a renewed interest in MGP site remediation. The recent Brownfield Initiative by the US Environmental Protection Agency (EPA) is such an example

  9. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  10. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17-21, 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team's findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ''US Department of Energy Voluntary Protection Program, Part 1: Program Elements'' to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA's VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status

  11. Diffusive flux of PAHs across sediment-water and water-air interfaces at urban superfund sites.

    Science.gov (United States)

    Minick, D James; Anderson, Kim A

    2017-09-01

    Superfund sites may be a source of polycyclic aromatic hydrocarbons (PAHs) to the surrounding environment. These sites can also act as PAH sinks from present-day anthropogenic activities, especially in urban locations. Understanding PAH transport across environmental compartments helps to define the relative contributions of these sources and is therefore important for informing remedial and management decisions. In the present study, paired passive samplers were co-deployed at sediment-water and water-air interfaces within the Portland Harbor Superfund Site and the McCormick and Baxter Superfund Site. These sites, located along the Willamette River (Portland, OR, USA), have PAH contamination from both legacy and modern sources. Diffusive flux calculations indicate that the Willamette River acts predominantly as a sink for low molecular weight PAHs from both the sediment and the air. The sediment was also predominantly a source of 4- and 5-ring PAHs to the river, and the river was a source of these same PAHs to the air, indicating that legacy pollution may be contributing to PAH exposure for residents of the Portland urban center. At the remediated McCormick and Baxter Superfund Site, flux measurements highlight locations within the sand and rock sediment cap where contaminant breakthrough is occurring. Environ Toxicol Chem 2017;36:2281-2289. © 2017 SETAC. © 2017 SETAC.

  12. Superfund record of decision (EPA Region 2): Carroll and Dubies Sewage Disposal, Port Jervis, Town of Deerpark, Orange County, NY, September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This decision document presents the selected remedial action for the contaminated groundwater at the Carroll and Dubies Superfund Site (the Site). This operable unit represents the second of two operable units planned for the Site. It addresses the contaminated groundwater underlying and downgradient of the Carroll and Dubies site.

  13. Occurences and Fate of DDT Principal Isomers/Metabolites, DDA, and o,p'-DDD Enantiomers in Fish, Sediment and Water at a DDT-Impacted Superfund Site

    Science.gov (United States)

    In the 1950s and 60s, discharges from a DDT manufacturing plant contaminated a tributary system of the Tennessee River near Huntsville, Alabama, USA. Regulatory action resulted in declaring the area a Superfund site which required remediation and extensive monitoring. Monitoring ...

  14. Annual status report on the inactive uranium mill tailings sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    Assessments of inactive uranium mill tailings sites in the United States led to the designation of 25 processing sites for remedial action under the provisions of Section 102(a) Public Law 95-604. The Department of Energy assessed the potential health effects to the public from the residual radioactive materials on or near the 25 sites; and, with the advice of the Environmental Protection Agency, the Secretary established priorities for performing remedial action. In designating the 25 sites and establishing the priorities for performing remedial action, the Department of Energy consulted with the Environmental Protection Agency, Nuclear Regulatory Commission, Department of the Interior, governors of the affected States, Navajo Nation, and appropriate property owners. Public participation in this process was encouraged. During Fiscal Year 1980, Department of Energy will be conducting surveys to verify the radiological characterization at the designated processing sites; developing cooperative agreements with the affected States; and initiating the appropriate National Environmental Policy Act documentation prior to conducting specific remedial actions.

  15. Minutes from Department of Energy/Hazardous Waste Remedial Actions Program research and development technology needs assessment review meeting

    International Nuclear Information System (INIS)

    1989-01-01

    On November 1--2, 1988, representatives of the Department of Energy (DOE) Headquarters, DOE Operations Offices, DOE contractors, and the Hazardous Waste Remedial Actions Program met in Salt Lake City, Utah, to select and prioritize candidate waste problems in need of research and development. The information gained will be used in planning for future research and development tasks and in restructuring current research activities to address the priority needs. All Operations Offices were represented by DOE staff and by contractor delegates from the area. This document summarizes the results of the meeting and lists the priority waste problems established

  16. Integration of Environmental Restoration and Waste Management Activities for a More Cost-Effective Tank Remediation Program Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Brill, A.; Clark, R.; Stewart, R.

    1998-01-01

    This paper presents plans and strategies for remediation of the liquid low-level radioactive waste (LLLW) tanks that have been removed from service (also known as inactive tanks) at Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. Much of the LLLW system at ORNL was installed more than 50 years ago. The overall objective of the Inactive Tank Program is to remediate all LLLW tanks that have been removed from service to the extent practicable in accordance with the regulatory requirements

  17. Stigma: The Psychology and Economics of Superfund (2004)

    Science.gov (United States)

    Study documents the long-term impacts of Superfund cleanup on property values in communities neighboring prominent Superfund sites, examining the sale prices of nearly 35,000 homes for up to a thirty-year period near six very large Superfund sites.

  18. Large-scale commercial applications of the in situ vitrification remediation technology

    International Nuclear Information System (INIS)

    Campbell, B.E.; Hansen, J.E.; McElroy, J.L.; Thompson, L.E.; Timmerman, C.L.

    1994-01-01

    The first large-scale commercial application of the innovative In Situ Vitrification (ISV) remediation technology was completed at the Parsons Chemical/ETM Enterprises Superfund site in Michigan State midyear 1994. This project involved treating 4,800 tons of pesticide and mercury-contaminated soil. The project also involved performance of the USEPA SITE Program demonstration test for the ISV technology. The Parsons project involved consolidation and staging of contaminated soil from widespread locations on and nearby the site. This paper presents a brief description of the ISV technology along with case-study type information on these two sites and the performance of the ISV technology on them. The paper also reviews other remediation projects where ISV has been identified as the/a preferred remedy, and where ISV is currently planned for use. These sites include soils contaminated with pesticides, dioxin, PCP, paint wastes, and a variety of heavy metals. This review of additional sites also includes a description of a planned radioactive mixed waste remediation project in Australia that contains large amounts of plutonium, uranium, lead, beryllium, and metallic and other debris buried in limestone and dolomitic soil burial pits. Initial test work has been completed on this application, and preparations are now underway for pilot testing in Australia. This project will demonstrate the applicability of the ISV technology to the challenging application of buried mixed wastes

  19. Superfund record of decision (EPA Region 2): Carroll and Dubies Sewage Disposal, Port Jervis, NY, March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This decision document presents the selected remedial action for the Carroll and Dubies Superfund Site (the Site). This operable unit (OU1) represents the first of two operable units planned for the Site. This operable unit addresses the source areas (lagoons and surrounding impacted soils) at the Site and actions needed to ensure that the source areas do not pose a threat to human health or the environment, including any potential cross media impacts to groundwater.

  20. Superfund TIO videos. Set A. Regulatory overview - CERCLA's relationship to other programs: RCRA, Title III, UST, CWA, SDWA. Part 1. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into five sections. Section 1 provides definitions and historical information on both the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The four types of RCRA regulatory programs - Subtitles C, D, I, and J - are described. Treatment, storage, and disposal (TSD) and recycling facilities are also discussed. Section 2 discusses the history behind the Emergency Planning and Community Right-to-Know Act (Title III). The four major provisions of Title III, which are emergency planning, emergency release notification, community right-to-know reporting, and the toxic chemical release inventory are covered. Section 3 outlines the UST program covering notification, record keeping, and the UST Trust Fund. Section 4 outlines the six major provisions of the Clean Water Act (CWA): water quality, pretreatment, prevention of oil and hazardous substance discharges, responses to oil and hazardous substance discharges, discharges of hazardous substances into the ocean, and dredge and fill. Section 5 explains the purpose, regulations, and standards of the Safe Drinking Water Act (SDWA). Specific issues such as underground injection, sole source aquifers, and lead contamination are discussed

  1. Role of institutional controls in selection of remedial measures

    International Nuclear Information System (INIS)

    Bakr, A.A.; Agoston, E.N.; McLeod, R.V.; Hicks, H.T.

    1992-01-01

    This paper explores the regulatory intent of CERCLA's definition and applicability of institutional controls at hazardous substance release sites undergoing remedial action and institutional controls that have been defined and implemented at selected CERCLA (Superfund) sites in the United States. Under provisions of CERCLA, institutional controls can be components of, or supplements to, interim or final remedial measures for hazardous substance [as defined under CERCLA 101(14)] releases. The use of institutional controls has been proposed in a number of RODs for large Superfund sites (e.g., Times Beach, Missouri; the Clothier Disposal Site in Oswego County, New York; and the Wildcat Landfill in Kent County, Delaware). In these cases, the selected remedial actions combine active response measures with institutional controls to protect human health and the environment. These RODs provide insight to how widely the concept of institutional controls is used and under what conditions. The use of institutional controls at large federal facilities is also discussed

  2. Environmental audit of the Maywood Site: Formerly Utilized Sites Remedial Action Program, Maywood Interim Storage Site vicinity properties

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This report presents the results of the Environmental Audit of the Maywood Site managed by the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Audit was carried out from November 7 through 16, 1990. The Audit Team found overall technical competence and knowledge of management and staff to be excellent. This applies to DOE as well as to Bechtel National, Incorporated (BNI). In particular, there was excellent knowledge of federal, state, and local environmental regulations, as well as analysis for applicability of these regulations to FUSRAP. Project management of the Maywood Site is also excellent. BNI and DOE project staff have made frequent contact with members of the community, and all removal actions and remedial investigation activities have been planned, scheduled, and accomplished with competence and attention to total quality principles. To date, all actions taken for the Maywood Site cleanup have been completed ahead of schedule and on or under budget. Weakness noted include self-assessment efforts by DOE, failure to fully implement DOE Order requirements throughout the program, and some discrepancies in formally documenting and reviewing procedures. 7 figs., 10 tabs.

  3. Department of Energy Defense Programs Environmental Restoration Program update

    International Nuclear Information System (INIS)

    Lehr, J.C.; Eyman, L.D.; Thompson, W.W. Jr.

    1989-01-01

    Federal facilities are under increasing pressure to remediate inactive hazardous waste sites and associated off-site areas. The Superfund Amendments and Reauthorization Act federal facilities provision requires that the Environmental Protection Agency establish a public docket to list all federal sites contaminated by hazardous wastes or substances and to monitor the progress of investigations and cleanups against an established schedule. In addition, the Resource Conservation and Recovery Act requires that operating permits for hazardous waste treatment, storage, and disposal facilities be issued only upon binding agreements that identify specific schedules for corrective action for all hazardous waste releases that have or are occurring at the facility. Defense Programs (DP) must make remedial actions integral to its mission. Environmental cleanups are given increased emphasis with the new regulations/laws providing the right to private citizens and the states to sue to enforce these statutes and schedule commitments. 1 fig., 2 tabs

  4. Maywood Interim Storage Site: Annual site environmental report, Maywood, New Jersey, Calendar year 1986: Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1987-06-01

    During 1986, the environmental monitoring program was continued at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. The MISS is presently used for the storage of low-level radioactively contaminated soils. The MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action and environmental monitoring programs are being conducted at this site and at vicinity properties by Bechtel National, Inc., Project Management Contractor for FUSRAP. The monitoring program at the MISS measures thoron and radon gas concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/y) and to assess the potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 1% of the DOE radiation protection standard of 100 mrem/y. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (due to greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the MISS that would result from radioactive materials present at the site would be indistinguishable from the dose the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the MISS is in compliance with the DOE radiation protection standard. 16 refs., 8 figs., 15 tabs.

  5. SUPERFUND TREATABILITY CLEARINGHOUSE: BDAT FOR SOLIDIFICATION/STABILIZATION TECHNOLOGY FOR SUPERFUND SOILS (DRAFT FINAL REPORT)

    Science.gov (United States)

    This report evaluates the performance of solidification as a method for treating solids from Superfund sites. Tests were conducted on four different artificially contaminated soils which are representative of soils found at the sites. Contaminated soils were solidified us...

  6. Developing a strategy and closure criteria for radioactive and mixed waste sites in the ORNL remedial action program: Regulatory interface

    International Nuclear Information System (INIS)

    Trabalka, J.R.

    1987-09-01

    Some options for stabilization and treatment of contaminated sites can theoretically provide a once-and-for-all solution (e.g., removal or destruction of contaminants). Most realizable options, however, leave contaminants in place (in situ), potentially isolated by physical or chemical, but more typically, by hydrologic measures. As a result of the dynamic nature of the interactions between contaminants, remedial measures, and the environment, in situ stablization measures are likely to have limited life spans, and maintenance and monitoring of performance become an essential part of the scheme. The length of formal institutional control over the site and related questions about future uses of the land and waters are of paramount importance. Unique features of the ORNL site and environs appear to be key ingredients in achieving the very long term institutional control necessary for successful financing and implementation of in situ stabilization. Some formal regulatory interface is necessary to ensure that regulatory limitations and new guidance which can affect planning and implementation of the ORNL Remedial Action Program are communicated to ORNL staff and potential technical and financial limitations which can affect schedules or alternatives for achievement of long-term site stabilization and the capability to meet environmental regulations are provided to regulatory bodies as early as possible. Such an interface should allow decisions on closure criteria to be based primarily on technical merit and protection of human health and the environment. A plan for interfacing with federal and state regulatory authorities is described. 93 refs., 1 fig., 4 tabs

  7. Superfund Sites as Anti-landscapes

    DEFF Research Database (Denmark)

    Nye, David

    2017-01-01

    Americans have used a range of narratives to make sense of their settlement and use of natural resources. This article focuses on narratives of environmental degradation after the United States passed legislation mandating the cleanup of toxic sites and provided a Superfund for that purpose. Thre...

  8. Assessment of blood lead level declines in an area of historical mining with a holistic remediation and abatement program.

    Science.gov (United States)

    Schoof, Rosalind A; Johnson, Dina L; Handziuk, Emma R; Landingham, Cynthia Van; Feldpausch, Alma M; Gallagher, Alexa E; Dell, Linda D; Kephart, Amy

    2016-10-01

    Lead exposure and blood lead levels (BLLs) in the United States have declined dramatically since the 1970s as many widespread lead uses have been discontinued. Large scale mining and mineral processing represents an additional localized source of potential lead exposure in many historical mining communities, such as Butte, Montana. After 25 years of ongoing remediation efforts and a residential metals abatement program that includes blood lead monitoring of Butte children, examination of blood lead trends offers a unique opportunity to assess the effectiveness of Butte's lead source and exposure reduction measures. This study examined BLL trends in Butte children ages 1-5 (n= 2796) from 2003-2010 as compared to a reference dataset matched for similar demographic characteristics over the same period. Blood lead differences across Butte during the same period are also examined. Findings are interpreted with respect to effectiveness of remediation and other factors potentially contributing to ongoing exposure concerns. BLLs from Butte were compared with a reference dataset (n=2937) derived from the National Health and Nutrition Examination Survey. The reference dataset was initially matched for child age and sample dates. Additional demographic factors associated with higher BLLs were then evaluated. Weights were applied to make the reference dataset more consistent with the Butte dataset for the three factors that were most disparate (poverty-to-income ratio, house age, and race/ethnicity). A weighted linear mixed regression model showed Butte geometric mean BLLs were higher than reference BLLs for 2003-2004 (3.48vs. 2.05µg/dL), 2005-2006 (2.65vs. 1.80µg/dL), and 2007-2008 (2.2vs. 1.72µg/dL), but comparable for 2009-2010 (1.53vs. 1.51µg/dL). This trend suggests that, over time, the impact of other factors that may be associated with Butte BLLs has been reduced. Neighborhood differences were examined by dividing the Butte dataset into the older area called "Uptown

  9. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status to date January 1998

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fifth year (1997) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). Staffing issues this year have been a challenge with the resignation of an Environmental Specialist (ES) in June 1997, and the death of Robert Stovall, an Environmental Engineer (EE) II in August 1997. Progress made during this period includes securing a contract laboratory, participation in several workgroup meetings for activities at the site, oversight of the Feasibility Study/Proposed Plan (FS/PP), coordination between the US Department of Energy and the various State regulatory programs and interactions with the local public drinking water supply agency and health departments

  10. Reorganizing the Instructional Reading Components: Could There Be a Better Way to Design Remedial Reading Programs to Maximize Middle School Students with Reading Disabilities' Response to Treatment?

    Science.gov (United States)

    Calhoon, Mary Beth; Sandow, Alexia; Hunter, Charles V.

    2010-01-01

    The primary purpose of this study was to explore if there could be a more beneficial method in organizing the individual instructional reading components (phonological decoding, spelling, fluency, and reading comprehension) within a remedial reading program to increase sensitivity to instruction for middle school students with reading disabilities…

  11. Program plan for evaluation and remediation of the generation and release of flammable gases in Hanford Site waste tanks

    International Nuclear Information System (INIS)

    Johnson, G.D.

    1991-08-01

    This program plan describes the activities being conducted for the resolution of the flammable gas problem that is associated with 23 high-level waste tanks at the Hanford Site. The classification of the wastes in all of these tanks is not final and some wastes may not be high-level wastes. However, until the characterization and classification is complete, all the tanks are treated as if they contain high-level waste. Of the 23 tanks, Tank 241-SY-101 (referred to as Tank 101-SY) has exhibited significant episodic releases of flammable gases (hydrogen and nitrous oxide) for the past 10 years. The major near-term focus of this program is for the understanding and stabilization of this tank. An understanding of the mechanism for gas generation and the processes for the episodic release will be obtained through sampling of the tank contents, laboratory studies, and modeling of the tank behavior. Additional information will be obtained through new and upgraded instrumentation for the tank. A number of remediation, or stabilization, concepts will be evaluated for near-term (2 to 3 years) applications to Tank 101-SY. Detailed safety assessments are required for all activities that will occur in the tank (sampling, removal of equipment, and addition of new instruments). This program plan presents a discussion of each task, provides schedules for near-term activities, and gives a summary of the expected work for fiscal years 1991, 1992, and 1993. 16 refs., 7 figs., 8 tabs

  12. Program plan for evaluation and remediation of the generation and release of flammable gases in Hanford Site waste tanks

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, G.D. (comp.)

    1991-08-01

    This program plan describes the activities being conducted for the resolution of the flammable gas problem that is associated with 23 high-level waste tanks at the Hanford Site. The classification of the wastes in all of these tanks is not final and some wastes may not be high-level wastes. However, until the characterization and classification is complete, all the tanks are treated as if they contain high-level waste. Of the 23 tanks, Tank 241-SY-101 (referred to as Tank 101-SY) has exhibited significant episodic releases of flammable gases (hydrogen and nitrous oxide) for the past 10 years. The major near-term focus of this program is for the understanding and stabilization of this tank. An understanding of the mechanism for gas generation and the processes for the episodic release will be obtained through sampling of the tank contents, laboratory studies, and modeling of the tank behavior. Additional information will be obtained through new and upgraded instrumentation for the tank. A number of remediation, or stabilization, concepts will be evaluated for near-term (2 to 3 years) applications to Tank 101-SY. Detailed safety assessments are required for all activities that will occur in the tank (sampling, removal of equipment, and addition of new instruments). This program plan presents a discussion of each task, provides schedules for near-term activities, and gives a summary of the expected work for fiscal years 1991, 1992, and 1993. 16 refs., 7 figs., 8 tabs.

  13. Fifteen years of Superfund at South Valley: Reengineering required

    International Nuclear Information System (INIS)

    Cormier, J.; Horak, F.

    1995-01-01

    It is no surprise to many of Superfund's practitioners that the law and its application are flawed. The South Valley Superfund Site in Albuquerque, New Mexico has not escaped Superfund's problems. The problems and issues arising out of the South Valley Superfund site have spurred the desire to seek a better way to administer and manage cleanup. This new method applies organizational and role changes that bring Superfund closer to an efficient business-like entity. This ''Reengineered'' Superfund strives for reorganization, contractor reduction, improved communication, reporting reduction, and teaming. In addition, modifications are made to the roles of regulators, potentially responsible parties (PRPs), and the public. Today the site encompasses roughly one square mile in area, includes six identified contaminant sources, and deals with solvent and petroleum by-product contamination

  14. EPA RREL's mobile volume reduction unit advances soil washing at four Superfund sites

    International Nuclear Information System (INIS)

    Gaire, R.; Borst, M.

    1994-01-01

    Research testing of the US. Environmental Protection Agency (EPA) Risk Reduction Engineering Laboratory's (RREL) Volume Reduction Unit (VRU), produced data helping advance soil washing as a remedial technology for contaminated soils. Based on research at four Superfund sites, each with a different matrix of organic contaminants, EPA evaluated the soil technology and provided information to forecast realistic, full-scale remediation costs. Primarily a research tool, the VRU is RREL's mobile test unit for investigating the breadth of this technology. During a Superfund Innovative Technology Evaluation (SITE) Demonstration at Escambia Wood Treating Company Site, Pensacola, FL, the VRU treated soil contaminated with pentachlorophenol (PCP) and polynuclear aromatic hydrocarbon-laden creosote (PAH). At Montana Pole and Treatment Plant Site, Butte, MT, the VRU treated soil containing PCP mixed with diesel oil (measured as total petroleum hydrocarbons) and a trace of dioxin. At Dover Air Force Base Site, Dover, DE, the VRU treated soil containing JP-4 jet fuel, measured as TPHC. At Sand Creek Site, Commerce City, CO, the feed soil at this site was contaminated with two pesticides: heptachlor and dieldrin. Less than 10 percent of these pesticides remained in the treated coarse soil fractions

  15. Potential enhancements to addressing programmatic risk in the tank waste remediation system (TWRS) program

    International Nuclear Information System (INIS)

    Brothers, A.; Fassbender, L.; Bilyard, G.; Levine, L.

    1996-04-01

    Pacific Northwest National Laboratory (PNNL) conducted a Tank Waste Remediation System (TWRS) Risk Management methodology development task. The objective of this task was to develop risk management methodology focused on (1) the use of programmatic risk information in making TWRS architecture selection decisions and (2) the identification/evaluation/selection of TWRS risk-handling actions. Methods for incorporating programmatic risk/uncertainty estimates into trade studies are provided for engineers/analysts. Methods for identifying, evaluating, and selecting risk-handling actions are provided for managers. The guidance provided in this report is designed to help decision-makers make difficult judgments. Current approaches to architecture selection decisions and identification/evaluation/selection of risk-handling actions are summarized. Three categories of sources of programmatic risk (parametric, external, and organizational) are examined. Multiple analytical approaches are presented to enhance the current alternative generation and analysis (AGA) and risk-handling procedures. Appendix A describes some commercially available risk management software tools and Appendix B provides a brief introduction to quantification of risk attitudes. The report provides three levels of analysis for enhancing the AGA Procedure: (1) qualitative discussion coupled with estimated uncertainty ranges for scores in the alternatives-by-criteria matrix; (2) formal elicitation of probability distributions for the alternative scores; and (3) a formal, more structured, comprehensive risk analysis. A framework is also presented for using the AGA programmatic risk analysis results in making better decisions. The report also presents two levels of analysis for evaluation and selection of risk-handling actions: (1) qualitative analysis and judgmental rankings of alternative actions, and (2) Simple Multi-Attribute Rating Technique (SMART)

  16. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  17. SITE COMPREHENSIVE LISTING (CERCLIS) - Contaminants at CERCLIS (Superfund) Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Contaminants at Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Sites - The CERCLIS Public Access Database...

  18. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - Responsible Parties at CERCLIS Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Responsible Parties at CERCLIS Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access...

  19. SITE COMPREHENSIVE LISTING (CERCLIS) (Superfund) - Non-NPL Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — Non-NPL Sites - The Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) (Superfund) Public Access Database contains a...

  20. Case history: Vertical barrier wall system for Superfund Site

    International Nuclear Information System (INIS)

    Koelling, M.A.; Kovac, C.P.; Norris, J.E.

    1997-01-01

    Design considerations and construction aspects are presented for the installation of a vertical barrier wall system for the Boeing Company at a Superfund Site near Seattle, WA. The construction was performed during 1996. The vertical barrier wall system included: (1) a soil-bentonite (SB) slurry wall, approximately 670 meters (2200 feet) in length, ranging from 12 to 21 meters (40 to 70 feet) in depth; (2) expansion of a cover system over the area enclosed by the SB wall; and (3) surface drainage improvements. Design and construction of the system addressed requirements of a Consent Decree for the site issued in 1993. The paper discusses the development of the design to meet remedial performance goals of preventing migration of contaminants in the soil/groundwater system and aiding aquifer restoration. Secondly, the paper details installation of the SB wall, highlighting the more significant construction issues, which included excavation of the wall through glacially deposited cobbles/boulders/till as well as addressing the severe elevation changes along the wall alignment. Thirdly, the paper presents Quality Assurance (QA) monitoring and testing performed during the construction phase

  1. Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs

  2. STEAM INJECTION REMEDIATION IN FRACTURED BEDROCK AT LORING AIR FORCE BASE

    Science.gov (United States)

    Contaminated groundwater occurs at many Superfund, RCRA, and Brownfields sites. Chlorinated solvents which can form a dense nonaqueous phase (DNAPL) when released to the subsurface can pose an extreme challenge for remediation, as DNAPLs are often difficult to locate and even ha...

  3. Superfund at work: Hazardous waste cleanup efforts nationwide, spring 1993 (Radium Chemical Site profile, Queens, New York)

    International Nuclear Information System (INIS)

    1993-01-01

    The Radium Chemical hazardous waste site in Queens, New York was contaminated with radium, posing a grave potential threat to the community. The US Environmental Protection Agency (EPA) used the Superfund program to design a long-term cleanup for the site using input from citizens and the business community. Superfund staff: Mobilized a quick cleanup action to remove 10,000 small containers of radium; Developed a streamlined approach to long-term cleanup; Secured the site to reduce the possibility of radiation exposure to the local residents; Cooperated with the community to design a well-organized emergency response plan; and Educated local citizens about site hazards, incorporating community concerns into the cleanup process. The Radium Chemical site is a clear example of EPA's effective management and problem-solving strategies at Superfund sites

  4. In situ soil remediation using electrokinetics

    International Nuclear Information System (INIS)

    Buehler, M.F.; Surma, J.E.; Virden, J.W.

    1994-11-01

    Electrokinetics is emerging as a promising technology for in situ soil remediation. This technique is especially attractive for Superfund sites and government operations which contain large volumes of contaminated soil. The approach uses an applied electric field to induce transport of both radioactive and hazardous waste ions in soil. The transport mechanisms include electroosmosis, electromigration, and electrophoresis. The feasibility of using electrokinetics to move radioactive 137 Cs and 60 Co at the Hanford Site in Richland, Washington, is discussed. A closed cell is used to provide in situ measurements of 137 Cs and 60 Co movement in Hanford soil. Preliminary results of ionic movement, along with the corresponding current response, are presented

  5. Environmental, Safety, and Health Plan for the remedial investigation/feasibility study at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Revision 1, Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Davis, C. M.; El-Messidi, O. E.; Cowser, D. K.; Kannard, J. R.; Carvin, R. T.; Will, III, A. S.; Clark, Jr., C.; Garland, S. B.

    1993-05-01

    This Environmental, Safety, and Health (ES&H) Plan presents the concepts and methodologies to be followed during the remedial investigation/feasibility study (RI/FS) for Oak Ridge National Laboratory (ORNL) to protect the health and safety of employees, the public, and the environment. This ES&H Plan acts as a management extension for ORNL and Martin Marietta Energy Systems, Inc. (Energy Systems) to direct and control implementation of the project ES&H program. The subsections that follow describe the program philosophy, requirements, quality assurance measures, and methods for applying the ES&H program to individual waste area grouping (WAG) remedial investigations. Hazardous work permits (HWPs) will be used to provide task-specific health and safety requirements.

  6. 32 CFR 310.47 - Civil remedies.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  7. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as ''the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as ''the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs

  8. Quality assurance/quality control summary report for Phase 1 of the Clinch River remedial investigation. Environmental Restoration Program

    International Nuclear Information System (INIS)

    Holladay, S.K.; Bevelhimer, M.S.; Brandt, C.C.

    1994-07-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants released from the US Department of Energy Oak Ridge Reservation and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. Phase 1 of the CRRI was a preliminary study in selected areas of the Clinch River/Watts Bar Reservoir. Fish, sediment, and water samples were collected and analyzed for inorganic, organic, and radiological parameters. Phase 1 was designed to (1) obtain high-quality data to confirm existing historical data for contaminant levels; (2) determine the range of contaminant concentrations present in the river-reservoir system; (3) identify specific contaminants of concern; and (4) establish the reference (background) concentrations for those contaminants. Quality assurance (QA) objectives for Phase I were that (1) scientific data generated would withstand scientific scrutiny; (2) data would be gathered using appropriate procedures for field sampling, chain-of-custody, laboratory analyses, and data reporting; and (3) data would be of known precision and accuracy. These objectives were met through the development and implementation of (1) a QA oversight program of audits and surveillances; (2) standard operating procedures accompanied by a training program; (3) field sampling and analytical laboratory quality control requirements; (4) data and records management systems; and (5) validation of the data by an independent reviewer. Approximately 1700 inorganic samples, 1500 organic samples, and 2200 radiological samples were analyzed and validated. The QA completeness objective for the project was to obtain valid analytical results for at least 95% of the samples collected

  9. Performance objectives of the tank waste remediation system low-level waste disposal program

    International Nuclear Information System (INIS)

    1994-01-01

    Before low-level waste may be disposed of, a performance assessment must be written and then approved by the U.S. Department of Energy. The performance assessment is to determine whether open-quotes reasonable assuranceclose quotes exists that the performance objectives of the disposal facility will be met. The DOE requirements for waste disposal require: the protection of public health and safety; and the protection of the environment. Although quantitative limits are sometimes stated (for example, the all exposure pathways exposure limit is 25 mrem/year), usually the requirements are stated in a general nature. Quantitative limits were established by: investigating all potentially applicable regulations as well as interpretations of the Peer Review Panel which DOE has established to review performance assessments, interacting with program management to establish their needs, and interacting with the public (i.e., the Hanford Advisory Board members; as well as affected Indian tribes) to understand the values of residents in the Pacific Northwest

  10. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  11. The role of innovative remediation technologies

    International Nuclear Information System (INIS)

    Doesburg, J.M.

    1992-05-01

    There are currently over 1200 sites on the US Superfund's National Priorities List (NPL) of hazardous waste sites, and there are over 30, 000 sites listed by the Comprehensive Environmental Responsibility, Compensation and Liability Information System (CERCLIS). The traditional approach to remediating sites in the US has been to remove the material and place it in a secure landfill, or in the case of groundwater, pump and treat the effluent. These technologies have proven to be very expensive and don't really fix the problem. The waste is just moved from one place to another. In recent years, however, alternative and innovative technologies have been increasingly used in the US to replace the traditional approaches. This paper will focus on just such innovative remediation technologies in the US, looking at the regulatory drivers, the emerging technologies, some of the problems in deploying technologies, and a case study

  12. Innovative design and construction solutions to remediate radiologically contaminated residential communities in Essex County New Jersey

    International Nuclear Information System (INIS)

    MacIndoe, M.S.; Johnson, R.T.; Wilkinson, S.G.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essen Country, New Jersey, are contaminated to varying degrees with radioactive materials. Both sites are listed on the Superfund National Priorities List (NPL). The waste materials originated from radium processing facilities prevalent in the area during the early 1900's. The design for remediation of these sites is performed by Bechtel National, Inc. on the behalf of the US Army Corps of Engineers (USACE) Kansas City District, which administers the project through an Interagency Agreement with the US Environmental Protection Agency (EPA) Region 2

  13. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.

  14. Alternative Remedies

    Science.gov (United States)

    ... Home › Aging & Health A to Z › Alternative Remedies Font ... medical treatment prescribed by their healthcare provider. Using this type of alternative therapy along with traditional treatments is ...

  15. Proceedings of the Department of Energy Defense Programs hazardous and mixed waste minimization workshop: Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    1988-09-01

    The first workshop on hazardous and mixed waste minimization was held in Las Vegas, Nevada, on July 26--28, 1988. The objective of this workshop was to establish an interchange between DOE headquarters (DOE-HQ) DP, Operations Offices, and contractors of waste minimization strategies and successes. The first day of the workshop began with presentations stressing the importance of establishing a waste minimization program at each site as required by RCRA, the land ban restrictions, and the decrease in potential liabilities associated with waste disposal. Discussions were also centered on pending legislation which would create an Office of Waste Reduction in the Environmental Protection Agency (EPA). The Waste Minimization and Avoidance Study was initiated by DOE as an addition to the long-term productivity study to address the issues of evolving requirements facing RCRA waste management activities at the DP sites, to determine how major operations will be affected by these requirements, and to determine the available strategies and options for waste minimization and avoidance. Waste minimization was defined in this study as source reduction and recycling

  16. Genealogy Remediated

    DEFF Research Database (Denmark)

    Marselis, Randi

    2007-01-01

    Genealogical websites are becoming an increasingly popular genre on the Web. This chapter will examine how remediation is used creatively in the construction of family history. While remediation of different kinds of old memory materials is essential in genealogy, digital technology opens new...... possibilities. Genealogists use their private websites to negotiate family identity and hereby create a sense of belonging in an increasingly complex society. Digital technologies enhance the possibilities of coorporation between genealogists. Therefore, the websites are also used to present archival...

  17. Toward identifying the next generation of superfund and hazardous waste site contaminants.

    Science.gov (United States)

    Ela, Wendell P; Sedlak, David L; Barlaz, Morton A; Henry, Heather F; Muir, Derek C G; Swackhamer, Deborah L; Weber, Eric J; Arnold, Robert G; Ferguson, P Lee; Field, Jennifer A; Furlong, Edward T; Giesy, John P; Halden, Rolf U; Henry, Tala; Hites, Ronald A; Hornbuckle, Keri C; Howard, Philip H; Luthy, Richard G; Meyer, Anita K; Sáez, A Eduardo; Vom Saal, Frederick S; Vulpe, Chris D; Wiesner, Mark R

    2011-01-01

    This commentary evolved from a workshop sponsored by the National Institute of Environmental Health Sciences titled "Superfund Contaminants: The Next Generation" held in Tucson, Arizona, in August 2009. All the authors were workshop participants. Our aim was to initiate a dynamic, adaptable process for identifying contaminants of emerging concern (CECs) that are likely to be found in future hazardous waste sites, and to identify the gaps in primary research that cause uncertainty in determining future hazardous waste site contaminants. Superfund-relevant CECs can be characterized by specific attributes: They are persistent, bioaccumulative, toxic, occur in large quantities, and have localized accumulation with a likelihood of exposure. Although still under development and incompletely applied, methods to quantify these attributes can assist in winnowing down the list of candidates from the universe of potential CECs. Unfortunately, significant research gaps exist in detection and quantification, environmental fate and transport, health and risk assessment, and site exploration and remediation for CECs. Addressing these gaps is prerequisite to a preventive approach to generating and managing hazardous waste sites. A need exists for a carefully considered and orchestrated expansion of programmatic and research efforts to identify, evaluate, and manage CECs of hazardous waste site relevance, including developing an evolving list of priority CECs, intensifying the identification and monitoring of likely sites of present or future accumulation of CECs, and implementing efforts that focus on a holistic approach to prevention.

  18. Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of a National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation.

  19. Modularizing Remedial Mathematics

    Science.gov (United States)

    Wong, Aaron

    2013-01-01

    As remedial mathematics education has become an increasingly important topic of conversation in higher education. Mathematics departments have been put under increased pressure to change their programs to increase the student success rate. A number of models have been introduced over the last decade that represent a wide range of new ideas and…

  20. Remediation: Higher Education's Bridge to Nowhere

    Science.gov (United States)

    Complete College America, 2012

    2012-01-01

    The intentions were noble. It was hoped that remediation programs would be an academic bridge from poor high school preparation to college readiness. Sadly, remediation has become instead higher education's "Bridge to Nowhere." This broken remedial bridge is travelled by some 1.7 million beginning students each year, most of whom will…

  1. Optimization Review: Carson River Mercury Superfund Site, Carson City, Nevada

    Science.gov (United States)

    The Carson River Mercury Site (CRMS) (Figure 1) is located in northwest Nevada and was designated a Superfund site in 1990 because of elevated mercury concentrations observed in surface water, sediments and biota inhabiting the site.

  2. In-Depth Case Studies of Superfund Reuse

    Science.gov (United States)

    SRI’s in-depth case studies explore Superfund reuse stories from start to finish. Their purpose is to see what redevelopment strategies worked, acknowledge reuse barriers and understand how communities overcame the barriers to create new reuse outcomes.

  3. Privacy Impact Assessment for the Enforcement Superfund Tracking System

    Science.gov (United States)

    This Enforcement Superfund Tracking System (ESTS) collects publicly available information from the California Secretary of State on businesses. Learn how this data is collected, how it will be used, access to the data, and the purpose of data collection.

  4. Human Health Toxicity Values in Superfund Risk Assessments

    Science.gov (United States)

    This memorandum revises the hierarchy of human health toxicity values generally recommended for use inr isk assessments, originally presented in Risk Assessment Guidance for Superfund Volume I, Part A.

  5. Information needs for demonstrating compliance with groundwater aspects of 40 CFR 192 for uranium mill tailings remedial action programs

    International Nuclear Information System (INIS)

    Logsdon, M.J.; Verma, T.R.; Martin, D.E.

    1984-01-01

    Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978, provides the Department of Energy with authority to perform remedial actions at designated inactive uranium-mill sites. The Environmental Protection Agency promulgated radiological and non-radiological standards (40 CFR 192) for remedial actions at inactive uranium-mill sites. All remedial actions require the concurrence of the Nuclear Regulatory Commission. Subpart C of 40 CFR 192 addresses the control of pollutants in groundwater at sites for which remedial action is proposed pursuant to P.L 95-604. As the authors interpret the regulation, it is essentially an admonition to carefully evaluate what is useful and practicable to deal with existing contamination and to control potential future contamination. In reviewing groundwater aspects of Uranium Mill Tailings Remedial Action documents, current NRC experience shows that the reports should address the following information needs: (1) The need to identify the physical and chemical nature of the present groundwater flow system in sufficient detail to provide a reasonable expectation that the extent and value of the groundwater resource to be protected is understood adequately; (2) The need to identify reasonable foreseeable events, both natural and man-made, that could alter the present groundwater flow system and the effects of such changes on the definition of the protected zone; (3) The need to identify current groundwater use within the protected zone; (4) The need to identify site-specific models, boundary conditions, and representative values of system parameters to predict with reasonable assurance that the proposed actions will protect groundwater and surface water resources for the design period of 200 - 1000 years

  6. Chromosomal aberrations in Sigmodon hispidus from a Superfund site

    International Nuclear Information System (INIS)

    Bowers, B.; McBee, K.; Lochmiller, R.; Burks, S.; Qualls, C.

    1995-01-01

    Cotton rats (Sigmodon hispidus) were collected from an EPA Superfund site located on an abandoned oil refinery. Three trapping grids were located on the refinery and three similar grids were located at uncontaminated localities which served as reference sites. Bone marrow metaphase chromosome preparations were examined for chromosomal damage. For each individual, 50 cells were scored for six classes of chromosomal lesions. For the fall 1991 trapping period, mean number of aberrant cells per individual was 2.33, 0.85, and 1.50 for the three Superfund grids., Mean number of aberrant cells per individual was 2.55, 2.55, and 2.12 from the reference grids. Mean number of lesions per cell was 2.77, 0.86, and 1.9 from the Superfund grids, and 3.55, 2.77, and 2.50 from the reference grids. For the spring 1992 trapping period, more damage was observed in animals from both Superfund and reference sites; however, animals from Superfund grids had more damage than animals from reference grids. Mean number of aberrant cells per individual was 3.50, 3.25, and 3.70 from the Superfund grids, and 2.40, 2.11, and 1.40 from the reference grids. Mean number of lesions per cell was 4.80, 4.25, and 5.50 from the Superfund grids, and 2.60, 2.33, and 1.50 from the reference grids. These data suggest animals may be more susceptible to chromosomal damage during winter months, and animals from the Superfund grids appear to be more severely affected than animals from reference grids

  7. Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

    Energy Technology Data Exchange (ETDEWEB)

    Deeb, Rula A.; Hawley, Elisabeth L. [ARCADIS, U.S., 2000 Powell St., 7th Floor, Emeryville, California 94608 (United States)

    2013-07-01

    The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-term management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed

  8. Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

    International Nuclear Information System (INIS)

    Deeb, Rula A.; Hawley, Elisabeth L.

    2013-01-01

    The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-term management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate

  9. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies

  10. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  11. Blasting at a Superfund chemical waste site

    International Nuclear Information System (INIS)

    Burns, D.R.

    1991-01-01

    During the summer of 1989, Maine Drilling and Blasting of Gardiner, Maine was contracted by Cayer Corporation of Harvard, Massachusetts to drill and blast an interceptor trench at the Nyanza Chemical Superfund Site in Ashland, Massachusetts. The interceptor trench was to be 1,365 feet long and to be blasted out of granite. The trench was to be 12 feet wide at the bottom with 1/1 slopes, the deepest cut being 30 feet deep. A French drain 12 feet wide by 15 to 35 feet deep was blasted below the main trench on a 2% slope from its center to each end. A French drain is an excavation where the rock is blasted but not dug. The trench would be used as a perimeter road with any ground water flow going through the French drain flowing to both ends of the trench. Being a Superfund project turned a simple blasting project into a regulatory nightmare. The US Environmental Protection Agency performed all the chemical related functions on site. The US Army Corps of Engineers was overseeing all related excavation and construction on site, as was the Massachusetts Department of Environmental Quality Engineering, the local Hazardous Wastes Council, and the local Fire Department. All parties had some input with the blasting and all issues had to be addressed. The paper outlines the project, how it was designed and completed. Also included is an outline of the blast plan to be submitted for approval, an outline of the Safety/Hazardous Waste training and a description of all the problems which arose during the project by various regulatory agencies

  12. Niagara Falls Storage Site environmental report for calendar year 1992, 1397 Pletcher Road, Lewiston, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Niagara Falls Storage Site (NFSS) and provides the results for 1992. From 1944 to the present, the primary use of NFSS has been storage of radioactive residues produced as a by-product of uranium production. All onsite areas of residual radioactivity above guidelines have been remediated. Materials generated during remediation are stored onsite in the 4-ha (10-acre) waste containment structure (WCS). The WCS is a clay-lined, clay-capped, and grass-covered storage pile. The environmental surveillance program at NFSS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium and radium-226 concentrations in surface water, sediments, and groundwater. Several chemical parameters, including seven metals, are also routinely measured in groundwater. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Results of environmental monitoring during 1992 indicate that levels of the parameters measured were in compliance with all but one requirement: Concentrations of iron and manganese in groundwater were above NYSDEC groundwater quality standards. However, these elements occur naturally in the soils and groundwater associated with this region. In 1992 there were no environmental occurrences or reportable quantity releases.

  13. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training

  14. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

  15. An evaluation of traditional and emerging remote sensing technologies for the detection of fugitive contamination at selected Superfund hazardous waste sites

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2011-01-01

    This report represents a remote sensing research effort conducted by the U.S. Geological Survey in cooperation with the U.S. Environmental Protection Agency (EPA) for the EPA Office of Inspector General. The objective of this investigation was to explore the efficacy of remote sensing as a technology for postclosure monitoring of hazardous waste sites as defined under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (Public Law 96-510, 42 U.S.C. §9601 et seq.), also known as \\"Superfund.\\" Five delisted Superfund sites in Maryland and Virginia were imaged with a hyperspectral sensor and visited for collection of soil, water, and spectral samples and inspection of general site conditions. This report evaluates traditional and hyperspectral imagery and field spectroscopic measurement techniques in the characterization and analysis of fugitive (anthropogenic, uncontrolled) contamination at previously remediated hazardous waste disposal sites.

  16. Centredale Manor Superfund Site in Rhode Island included on EPA List of Targeted for Immediate Attention

    Science.gov (United States)

    Today, the U.S. Environmental Protection Agency released the list of Superfund sites that Administrator Pruitt has targeted for immediate and intense attention. The Centredale Manor Restoration Project superfund site is one of the 21 sites on the list.

  17. "The feasibility of implementing cognitive remediation for work in community based psychiatric rehabilitation programs": Correction to McGurk et al. (2017).

    Science.gov (United States)

    2017-06-01

    Reports an error in "The feasibility of implementing cognitive remediation for work in community based psychiatric rehabilitation programs" by Susan R. McGurk, Kim T. Mueser, Melanie A. Watkins, Carline M. Dalton and Heather Deutsch ( Psychiatric Rehabilitation Journal , 2017[Mar], Vol 40[1], 79-86). In the article, the author order was incorrect due to a printer error. The online version of this article has been corrected. (The following abstract of the original article appeared in record 2017-13255-004.) Objective: Adding cognitive remediation to vocational rehabilitation services improves cognitive and work functioning in people with serious mental illness, but despite interest, the uptake of cognitive programs into community services has been slow. This study evaluated the feasibility of implementing an empirically supported cognitive remediation program in routine rehabilitation services at 2 sites. The Thinking Skills for Work (TSW) program was adapted for implementation at 2 sites of a large psychiatric rehabilitation agency providing prevocational services, but not community-based vocational services, which were provided off-site. Agency staff were trained to deliver TSW to clients with work or educational goals. Cognitive assessments were conducted at baseline and posttreatment, with work and school activity tracked for 2 years. Eighty-three participants enrolled in TSW, of whom 79.5% completed at least 6 of the 24 computer cognitive exercise sessions (M = 16.7) over an average of 18 weeks. Participants improved significantly from baseline to posttreatment in verbal learning and memory, speed of processing, and overall cognitive functioning. Over the follow-up, 25.3% of participants worked and 47.0% were involved in work or school activity. Higher work rates were observed at the site where participants had easier access to vocational services. The results support the feasibility of implementing the TSW program by frontline staff in agencies providing

  18. Chemical dechlorination of pesticides at a superfund site in Region II

    International Nuclear Information System (INIS)

    Pendergrass, S.; Prince, J.

    1991-01-01

    Selecting technologies for cleaning up hazardous waste sites is a complex task, due in part to the rapidly changing nature of the state-of-the-art in technology. There is strong support for use of innovative technologies as specified in Section 121(b) of CERCLA. However, use of an innovative technology requires overcoming a variety of challenges. These challenges include: Screening potentially appropriate technologies, including innovative technologies, and selecting one or more potential innovative technologies for which preliminary results are promising; however, site-specific data are needed prior to technology evaluation. Evaluating the effectiveness of the proposed technology for the site through the use of treatability studies. Gaining acceptance for the innovative technology, which may employ new or unfamiliar concepts. Determining optimal design and operating parameters for full-scale remediation. This paper discusses the technology evaluation process and how that process supported the selection of an innovative technology for the Myers Property site, a Superfund site in Region II. A case study is presented showing how technology screening and laboratory treatability studies were used to evaluate an innovative technology (chemical dechlorination), which was selected as the technology for remediation of soils and sediments contaminated with pesticides at this environmentally sensitive site in New Jersey. The remedy selected by the U.S. EPA for this site designates chemical dechlorination as the selected technology, but does not specify any particular vendor or process. Rather, the remedy sets forth technology performance standards and recommends certain design tasks which may be used to select a particular chemical process. This paper discusses he of these design tasks as they might apply to innovative technologies, using chemical dechlorination as a model

  19. Cost considerations in remediation and disposal

    International Nuclear Information System (INIS)

    Dance, J.T.; Huddleston, R.D.

    1999-01-01

    Opportunities for assessing the costs associated with the reclamation and remediation of sites contaminated by oilfield wastes are discussed. The savings can be maximized by paying close attention to five different aspects of the overall site remediation and disposal process. These are: (1) highly focused site assessment, (2) cost control of treatment and disposal options, (3) value added cost benefits, (4) opportunities to control outside influences during the remedial process, and (5) opportunities for managing long-term liabilities and residual risk remaining after the remedial program is completed. It is claimed that addressing these aspects of the process will ultimately lower the overall cost of site remediation and waste disposal

  20. 78 FR 23563 - LWD, Inc. Superfund Site; Calvert City, Marshall County, Kentucky; Notice of Settlement

    Science.gov (United States)

    2013-04-19

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9805-2; CERCLA-04-2013-3751] LWD, Inc. Superfund Site... costs concerning the LWD, Inc., Superfund Site located in Calvert City, Marshall County, Kentucky. The... V. Painter. Submit your comments by Site name LWD, Inc., Superfund Site by one of the following...

  1. 78 FR 14543 - Ward Transformer Superfund Site; Raleigh, Wake County, NC; Notice of Settlement

    Science.gov (United States)

    2013-03-06

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL 9788-2; CERCLA-04-2013-3754] Ward Transformer Superfund Site... Ward Transformer Superfund Site located in Raleigh, Wake County, North Carolina. Under the terms of the.... Submit your comments by Site name Ward Transformer Superfund Site by one of the following methods: [[Page...

  2. Post remedial action survey report for Building 003, Santa Susana Field Laboratories, Rockwell International, Ventura County, California, October 1981; April 1982. Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Wynveen, R.A.; Smith, W.H.; Sholeen, C.M.; Justus, A.L.; Flynn, K.F.

    1983-10-01

    Rockwell International's Santa Susana Laboratories in Ventura County, California, have been the site of numerous Federally-funded projects involving the use of radioactive materials. One such project was the System for Nuclear Auxiliary Power (SNAP) Program. Building 003 on the Santa Susana site was used in conjunction with the SNAP Program and contained a highly shielded area designed for remote manipulation of radioactive materials. Such facilities are commonly referred to as hot caves. During the SNAP Program, fuel burnup samples were analyzed and irradiation experiments were evaluated in the Building 003 hot cave. Use of the hot cave facility ended when the SNAP Program was terminated in 1973. Subsequently, the Building 003 facilities were declared excess and were decontaminaed and decommissioned during the first half of calendar year 1975. At that time, the building was given a preliminary release. In 1981, a post-remedial-action (certification) survey of Building 003 was conducted at the request of the Department of Energy. Significant levels of residual contamination were found in various parts of the building. Consequently, additional decontamination was conducted by Rockwell International. A final post-remedial-action survey was conducted during April 1982, and those areas in Building 003 that had been found contaminated in 1981 were now found to be free of detectable radioactive contamination. Sludge samples taken from the sewer sump showed elevated levels of enriched uranium contaminant. Hence, all sewer lines within Building 003 were removed. This permitted unconditional release of the building for unrestricted use. However, the sewer lines exterior to the building, which remain in place, must be considered potentially contaminated and, therefore, subject to restricted use

  3. Middlesex Sampling Plant environmental report for calendar year 1992, 239 Mountain Avenue, Middlesex, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Middlesex Sampling Plant (MSP) and provides the results for 1992. The site, in the Borough of Middlesex, New Jersey, is a fenced area and includes four buildings and two storage piles that contain 50,800 m{sup 3} of radioactive and mixed hazardous waste. More than 70 percent of the MSP site is paved with asphalt. The MSP facility was established in 1943 by the Manhattan Engineer District (MED) to sample, store, and/or ship uranium, thorium, and beryllium ores. In 1955 the Atomic Energy Commission (AEC), successor to MED, terminated the operation and later used the site for storage and limited sampling of thorium residues. In 1967 AEC activities ceased, onsite structures were decontaminated, and the site was certified for unrestricted use under criteria applicable at that time. In 1980 the US Department of Energy (DOE) initiated a multiphase remedial action project to clean up several vicinity properties onto which contamination from the plant had migrated. Material from these properties was consolidated into the storage piles onsite. Environmental surveillance of MSP began in 1980 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program. The environmental surveillance program at MSP includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-230, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analyses are performed to detect metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling th DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses.

  4. Remediation Technology Collaboration Development

    Science.gov (United States)

    Mahoney, John; Olsen, Wade

    2010-01-01

    This slide presentation reviews programs at NASA aimed at development at Remediation Technology development for removal of environmental pollutants from NASA sites. This is challenging because there are many sites with different environments, and various jurisdictions and regulations. There are also multiple contaminants. There must be different approaches based on location and type of contamination. There are other challenges: such as costs, increased need for resources and the amount of resources available, and a regulatory environment that is increasing.

  5. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  6. Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

    Energy Technology Data Exchange (ETDEWEB)

    Carpenter, Cliff [U.S. Department of Energy, Office of Legacy Management; Castillo, Darina [U.S. Department of Energy, Office of Legacy Management; Fatherly, Nicki [U.S. Army Corps of Engineers; Miller, Michele [Navarro Research and Engineering

    2016-03-06

    The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed

  7. Preliminary remediation goals for ecological endpoints

    International Nuclear Information System (INIS)

    Efroymson, R.A.; Suter, G.W. II; Sample, B.E.; Jones, D.S.

    1996-07-01

    Preliminary remediation goals (PRGs) are useful for risk assessment and decision making at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites. PRGs are upper concentration limits for specific chemicals in specific environmental media that are anticipated to protect human health or the environment. They can be used for multiple remedial investigations at multiple facilities. In addition to media and chemicals of potential concern, the development of PRGs generally requires some knowledge or anticipation of future land use. In Preliminary Remediation Goals for Use at the U.S. Department of Energy Oak Ridge Operations Office (Energy Systems 1995), PRGs intended to protect human health were developed with guidance from Risk Assessment Guidance for Superfund: Volume I - Human Health Evaluation Manual, Part B (RAGS) (EPA 1991). However, no guidance was given for PRGs based on ecological risk. The numbers that appear in this volume have, for the most part, been extracted from toxicological benchmarks documents for Oak Ridge National Laboratory (ORNL) and have previously been developed by ORNL. The sources of the quantities, and many of the uncertainties associated with their derivation, are described in this technical memorandum

  8. Preliminary remediation goals for ecological endpoints

    International Nuclear Information System (INIS)

    Efroymson, R.A.; Suter, G.W. II.

    1995-09-01

    Preliminary remediation goals (PRGs) are useful for risk assessment and decision making at Comprehensive Environmental Response, compensation, and Liability Act (CERCLA) sites. PRGs are upper concentration limits for specific chemicals in specific environmental media that are anticipated to protect human health or the environment. They can be used for multiple remedial investigations at multiple facilities. In addition to media and chemicals of potential concern, the development of PRGs generally requires some knowledge or anticipation of future land use. In Preliminary Remediation Goals for Use at the US Department of Energy Oak Ridge Operations Office (Energy Systems 1995), PRGs intended to protect human health were developed with guidance from Risk Assessment Guidance for Superfund: Volume I-Human Health Evaluation Manual, Part B (RAGS) (EPA 1991). However, no guidance was given for PRGs based on ecological risk. The numbers that appear in this volume have, for the most part, been extracted from toxicological benchmarks documents for Oak Ridge National Laboratory (ORNL) and have previously been developed by ORNL. The sources of the quantities, and many of the uncertainties associated with their derivation, are described in this technical memorandum

  9. Superfund TIO videos: Set B. Community relations, communicating with the media and presenting technical information. Part 9. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into three sections. Section 1 discusses the Superfund Community Relations (CR) Program and its history and objectives. Community Relations requirements as defined by CERCLA for Superfund actions are outlined. Community Relations requirements, the nature of community involvement in CR plans, effective CR techniques, and the roles of the OSC, RPM, and EPA Community Relations Coordinator (CRC) are discussed. Section 2 (1) describes the media's perspective on seeking information; (2) identifies five settings and mechanisms for interacting with the media; (3) offers good media-relations techniques; and (4) lists tips for conducting media interviews. Section 3 outlines techniques for presenting technical information, describes how to be prepared to address typical issues of community concern, and identifies the four key elements in handling tough questions

  10. Object reasoning for waste remediation

    International Nuclear Information System (INIS)

    Pennock, K.A.; Bohn, S.J.; Franklin, A.L.

    1991-08-01

    A large number of contaminated waste sites across the United States await size remediation efforts. These sites can be physically complex, composed of multiple, possibly interacting, contaminants distributed throughout one or more media. The Remedial Action Assessment System (RAAS) is being designed and developed to support decisions concerning the selection of remediation alternatives. The goal of this system is to broaden the consideration of remediation alternatives, while reducing the time and cost of making these considerations. The Remedial Action Assessment System is a hybrid system, designed and constructed using object-oriented, knowledge- based systems, and structured programming techniques. RAAS uses a combination of quantitative and qualitative reasoning to consider and suggest remediation alternatives. The reasoning process that drives this application is centered around an object-oriented organization of remediation technology information. This paper describes the information structure and organization used to support this reasoning process. In addition, the paper describes the level of detail of the technology related information used in RAAS, discusses required assumptions and procedural implications of these assumptions, and provides rationale for structuring RAAS in this manner. 3 refs., 3 figs

  11. Northwest Hazardous Waste Research, Development, and Demonstration Center: Program Plan

    International Nuclear Information System (INIS)

    1988-02-01

    The Northwest Hazardous Waste Research, Development, and Demonstration Center was created as part of an ongoing federal effort to provide technologies and methods that protect human health and welfare and environment from hazardous wastes. The Center was established by the Superfund Amendments and Reauthorization Act (SARA) to develop and adapt innovative technologies and methods for assessing the impacts of and remediating inactive hazardous and radioactive mixed-waste sites. The Superfund legislation authorized $10 million for Pacific Northwest Laboratory to establish and operate the Center over a 5-year period. Under this legislation, Congress authorized $10 million each to support research, development, and demonstration (RD and D) on hazardous and radioactive mixed-waste problems in Idaho, Montana, Oregon, and Washington, including the Hanford Site. In 1987, the Center initiated its RD and D activities and prepared this Program Plan that presents the framework within which the Center will carry out its mission. Section 1.0 describes the Center, its mission, objectives, organization, and relationship to other programs. Section 2.0 describes the Center's RD and D strategy and contains the RD and D objectives, priorities, and process to be used to select specific projects. Section 3.0 contains the Center's FY 1988 operating plan and describes the specific RD and D projects to be carried out and their budgets and schedules. 9 refs., 18 figs., 5 tabs

  12. Wayne Interim Storage Site environmental report for calendar year 1992, 868 Black Oak Ridge Road, Wayne, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.

  13. Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations: Generator training manual

    International Nuclear Information System (INIS)

    1993-03-01

    This computer-based program is designed to help waste generators in the Environmental Restoration (ER) Program prevent pollution at the DOE Oak Ridge Field Office (DOE-OR) facilities in Oak Ridge, Paducah, and Portsmouth. The Numerical Scoring System (NSS) is an interactive system designed to maintain data on ER Program pollution prevention efforts and to measure the success of these efforts through the ER Program life cycle

  14. Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations: Management training manual

    International Nuclear Information System (INIS)

    1993-03-01

    This computer-based program is designed to help waste generators in the Environmental Restoration (ER) Program prevent pollution at the DOE Oak Ridge Field Office (DOE-OR) facilities in Oak Ridge, Paducah, and Portsmouth. The Numerical Scoring System (NSS) is an interactive system designed to maintain data on ER Program pollution prevention efforts and to measure the success of these efforts through the ER Program life cycle

  15. Fall Protection Procedures for Sealing Bulk Waste Shipments by Rail Cars at Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites - 13509

    Energy Technology Data Exchange (ETDEWEB)

    Boyle, J.D. [U.S. Army Corps of Engineers - Buffalo District, Buffalo, New York 14207 (United States); Fort, E. Joseph; Lorenz, William [Cabrera Services (Cabrera) East Harford, CT 06108 (United States); Mills, Andy [Shaw Environmental and Infrastructure, Inc. (Shaw) Baton Rouge, LA 70809 (United States)

    2013-07-01

    Rail-cars loaded with radioactive materials must be closed and fastened to comply with United States Department of Transportation (DOT) requirements before they shipped. Securing waste shipments in a manner that meets these regulations typically results in the use of a sealable rail-car liner. Workers accessing the tops of the 2.74 m high rail-cars to seal and inspect liners for compliance prior to shipment may be exposed to a fall hazard. Relatively recent revisions to the Fall Protection requirements in the Safety and Health Requirements Manual (EM385-1-1, U.S. Army Corps of Engineers) have necessitated modifications to the fall protection systems previously employed for rail-car loading at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In response these projects have developed site-specific procedures to protect workers and maintain compliance with the improved fall protection regulations. (authors)

  16. Minutes from Department of Energy/Hazardous Waste Remedial Actions Program, research and development technology needs assessment review meeting for FY 1990, September 1989, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1990-08-01

    On September 20--21, 1989, representatives of the Department of Energy (DOE) Headquarters, DOE Operations Offices, DOE contractors, and the Hazardous Waste Remedial Actions Program met in Oak Ridge, Tennessee, to select and prioritize candidate waste problems in need of research and development. The information gained will be used in planning for future research and development tasks and in restructuring current research activities to address the priority needs. Consistent with the ongoing reevaluation of DOE's plans for environmental restoration and waste management, an attempt was made to relate the needs developed in this meeting to the needs expressed in the draft Applied Research, Development, Demonstration, Testing, and Evaluation Plan. Operations Offices were represented either by DOE staff or by contractor delegates from the area. This document summarizes the results of the meeting and lists the priority waste problems established.

  17. Geochemical Characteristics of TP3 Mine Wastes at the Elizabeth Copper Mine Superfund Site, Orange County, Vermont

    Science.gov (United States)

    Hammarstrom, Jane M.; Piatak, Nadine M.; Seal, Robert R.; Briggs, Paul H.; Meier, Allen L.; Muzik, Timothy L.

    2003-01-01

    Remediation of the Elizabeth mine Superfund site in the Vermont copper belt poses challenges for balancing environmental restoration goals with issues of historic preservation while adopting cost-effective strategies for site cleanup and long-term maintenance. The waste-rock pile known as TP3, at the headwaters of Copperas Brook, is especially noteworthy in this regard because it is the worst source of surface- and ground-water contamination identified to date, while also being the area of greatest historical significance. The U.S. Geological Survey (USGS) conducted a study of the historic mine-waste piles known as TP3 at the Elizabeth mine Superfund site near South Strafford, Orange County, VT. TP3 is a 12.3-acre (49,780 m2) subarea of the Elizabeth mine site. It is a focus area for historic preservation because it encompasses an early 19th century copperas works as well as waste from late 19th- and 20th century copper mining (Kierstead, 2001). Surface runoff and seeps from TP3 form the headwaters of Copperas Brook. The stream flows down a valley onto flotation tailings from 20th century copper mining operations and enters the West Branch of the Ompompanoosuc River approximately 1 kilometer downstream from the mine site. Shallow drinking water wells down gradient from TP3 exceed drinking water standards for copper and cadmium (Hathaway and others, 2001). The Elizabeth mine was listed as a Superfund site in 2001, mainly because of impacts of acid-mine drainage on the Ompompanoosuc River.

  18. 200-ZP-1 IRM phase 2 and 3 remedial design report, Revision 1

    International Nuclear Information System (INIS)

    1996-07-01

    This 200-ZP-1 remedial design report presents the objectives and rationale developed for the design and implementation of the selected interim remedial measure (IRM) for the 200-ZP-1 Operable Unit, located in the 200 West Area of the Hanford Site.The IRM was chosen in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986, the Hanford Federal Facility Agreement and Consent Order (also known as the Tri- party Agreement), and the National Oil and Hazardous Substance Pollution Contingency Plan

  19. Are Universities Providing Non-STEM Students the Mathematics Preparation Required by Their Programs?: A Case Study of A Quantitative Literacy Pathway and Vertical Alignment from Remediation to Degree Completion

    Science.gov (United States)

    Allen, Charles

    2017-01-01

    Informed by Gagne's belief in the necessity of prerequisite knowledge for new learning, and Bruner's Spiral Curriculum Theory, the objective of this case study was to explore the postsecondary pathway from remedial mathematics, through one gateway mathematics course, and into the quantitative literacy requirements of various non-STEM programs of…

  20. Remediation plans in family medicine residency

    Science.gov (United States)

    Audétat, Marie-Claude; Voirol, Christian; Béland, Normand; Fernandez, Nicolas; Sanche, Gilbert

    2015-01-01

    Abstract Objective To assess use of the remediation instrument that has been implemented in training sites at the University of Montreal in Quebec to support faculty in diagnosing and remediating resident academic difficulties, to examine whether and how this particular remediation instrument improves the remediation process, and to determine its effects on the residents’ subsequent rotation assessments. Design A multimethods approach in which data were collected from different sources: remediation plans developed by faculty, program statistics for the corresponding academic years, and students’ academic records and rotation assessment results. Setting Family medicine residency program at the University of Montreal. Participants Family medicine residents in academic difficulty. Main outcome measures Assessment of the content, process, and quality of remediation plans, and students’ academic and rotation assessment results (successful, below expectations, or failure) both before and after the remediation period. Results The framework that was developed for assessing remediation plans was used to analyze 23 plans produced by 10 teaching sites for 21 residents. All plans documented cognitive problems and implemented numerous remediation measures. Although only 48% of the plans were of good quality, implementation of a remediation plan was positively associated with the resident’s success in rotations following the remediation period. Conclusion The use of remediation plans is well embedded in training sites at the University of Montreal. The residents’ difficulties were mainly cognitive in nature, but this generally related to deficits in clinical reasoning rather than knowledge gaps. The reflection and analysis required to produce a remediation plan helps to correct many academic difficulties and normalize the academic career of most residents in difficulty. Further effort is still needed to improve the quality of plans and to support teachers.

  1. Field sampling and analysis plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Boston, H.L.; Ashwood, T.L.; Borders, D.M.; Chidambariah, V.; Downing, D.J.; Fontaine, T.A.; Ketelle, R.H.; Lee, S.Y.; Miller, D.E.; Moore, G.K.; Suter, G.W.; Tardiff, M.F.; Watts, J.A.; Wickliff, D.S.

    1992-02-01

    This field sampling and analysis (S & A) plan has been developed as part of the Department of Energy`s (DOE`s) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S & A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig. 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S & A plan; the scope and implementation of the first 2 years of effort of the S & A plan and includes recent information about contaminants of concern, organization of S & A activities, interactions with other programs, and quality assurance specific to the S & A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan.

  2. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels.

  3. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    International Nuclear Information System (INIS)

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels

  4. Uranium mill tailings remedial action program. Radiological survey of Shiprock vicinity property SH01, Shiprock, NM, August-November 1982

    International Nuclear Information System (INIS)

    Flynn, K.F.; Justus, A.L.; Sholeen, C.M.; Smith, W.H.; Wynveen, R.A.

    1984-04-01

    A comprehensive survey of the vicinity property designated as SH01 was conducted on an intermittent basis from August 23 to November 11, 1982. At the time of the survey, three structures were located on the property - two residential structures and a residential trailer. In addition to the three residences, the frame from a former truck scale was still on the property. The lands surrounding the structures and former truck scale were sparsely covered with vegetation. The assessment activities included determination of indoor and outdoor surface radiation levels through direct instrument surveys and analysis of air and soil samples. No evidence of radioactive contamination was found inside the structures, although elevated levels of radioactivity due to proximity to or shine from contaminated soils were indicated within all. The short-term radon daughter measurements did not exceed the limit of 0.02 Working Level for average annual concentration including background, as specified in the EPA Standard 40 CFR 192. The assessment indicated elevated levels of radioactivity in the outdoor environs, encompassing about 32,000 ft 2 (2900 m 2 ) of land surrounding, and north of, the former truck scale. Analysis of a surface soil sample collected from the environs indicated a radium concentration considerably in excess of the limit of 5 pCi/g above background specified in the EPA Standard. Subsurface soil sampling was not conducted, and thus the vertical extent of the radiological contamination is not known. Since the surface soil contamination level exceeded the limit specified in the EPA Standard, remedial action for this vicinity site should be considered

  5. Uranium mill tailings remedial action program. Radiological survey of Shiprock vicinity property SH03, Shiprock, NM, July-November 1982

    International Nuclear Information System (INIS)

    Flynn, K.F.; Justus, A.L.; Sholeen, C.M.; Smith, W.H.; Wynveen, R.A.

    1984-04-01

    A comprehensive survey of the vicinity property designated as SH03 was conducted on an intermittent basis from July 26 to November 11, 1982. At the time of the survey, three structures were located on the property - a residential trailer, the main structure, and an old gas pump housing. The lands surrounding the structures were either sparsely covered with arid vegetation or paved. The assessment activities included determination of indoor and outdoor surface radiation levels, for both fixed and removable contamination, through direct instrument and smear (indoor only) surveys; measurement of ambient external penetrating radiation levels at 1-meter heights; and analyses of air, soil, and other material samples. No evidence of radioactive contamination was found inside the trailer. However, the results of the radiological assessment did indicate the occurrence of elevated levels of gamma, surface alpha, and radon daughter radioactivity within the main structure. The short-term radon daughter measurements exceeded the limit of 0.02 Working Level for average annual concentration including background. The assessment also indicated elevated levels of radioactivity in the outdoor environs, encompassing about 32,000 ft 2 of the grounds adjacent to and surrounding the main structure on the east, south, and west sides. The contamination appeared to be due to the presence of unprocessed uranium ore. Analysis of surface soil samples collected from the environs indicated radium concentrations in excess of the limit of 5 pCi/g above background specified in the EPA Standard. Subsurface soil sampling was not conducted, and thus the vertical extent of the radiological contamination is not known. Since the surface soil contamination levels exceeded the limits specified in the EPA Standard, remedial action for this vicinity site should be considered

  6. An evaluation of remote sensing technologies for the detection of fugitive contamination at selected Superfund hazardous waste sites in Pennsylvania

    Science.gov (United States)

    Slonecker, E. Terrence; Fisher, Gary B.

    2014-01-01

    This evaluation was conducted to assess the potential for using both traditional remote sensing, such as aerial imagery, and emerging remote sensing technology, such as hyperspectral imaging, as tools for postclosure monitoring of selected hazardous waste sites. Sixteen deleted Superfund (SF) National Priorities List (NPL) sites in Pennsylvania were imaged with a Civil Air Patrol (CAP) Airborne Real-Time Cueing Hyperspectral Enhanced Reconnaissance (ARCHER) sensor between 2009 and 2012. Deleted sites are those sites that have been remediated and removed from the NPL. The imagery was processed to radiance and atmospherically corrected to relative reflectance with standard software routines using the Environment for Visualizing Imagery (ENVI, ITT–VIS, Boulder, Colorado) software. Standard routines for anomaly detection, endmember collection, vegetation stress, and spectral analysis were applied.

  7. Integrating innovative technology into remedial action at a US Department of Energy facility

    International Nuclear Information System (INIS)

    Diggs, I.W.

    1992-01-01

    The US Atomic Energy Commission (AEC), predecessor to the US Department Energy (DOE), established a production complex in the early 1950's for processing uranium and its compounds from natural uranium ore concentrates for the purpose of producing high purity uranium metal for various uses in defense reactor and nuclear weapons programs. This complex, previously known as the Feed Materials Production Center (FMPC), is now known as the Fernald Environmental Management Project (FEMP). In 1989, production was stopped at the feed materials facility due to a decision by the DOE. In December of 1989, the site was placed on the US EPA's National Priorities List (NPL) of sites requiring environmental cleanup. As a result, in April of 1990 the DOE and the US EPA signed a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Consent Agreement which augmented the FFCA. The DOE recently decided that production at the facility would not be resumed, and therefore, the main scope of work would change to remediation and closure of the site. In response to the FFCA and consistent with the modifications agreed to in the amended Consent Agreement, a Remedial Investigation/Feasibility Study (RI/FS) is in progress pursuant to CERCLA, as amended by the Superfund Amendments and Reauthorization Act (SARA). A RI/FS is a comprehensive environmental investigation systematically conducted according to US EPA regulations and guidelines used to identify and select an action plan for the cleanup of CERCLA sites. The RI phase incorporates a broad-based study to evaluate as completely as possible existing environmental and public health risks associated with past or existing facility operations. The FS phase develops and evaluates corrective action alternatives to mitigate identified environmental concerns

  8. Superfund Remedial Acquisition Framework SOL-R3-13-00006: Region 3 - National Remedial Action Contracts / Multiple Award Competition

    Science.gov (United States)

    Region 3 - EPA is performing market research to determine if industry has the capability and capacity to perform the work, on a national level, as described in the attached draft Statement of Work /Performance Work Statement(SOW/PWS).

  9. Superfund TIO videos: Set A. Settlement tools and practices, win-win negotiations, closeout, records management, authorities and liabilities. Part 5. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into 5 sections. Section 1 provides an overview of settlement activities including conducting an information exchange, issuing general notice letters, initiating special notice procedures, receiving good faith offers (GFO), negotiating and settlements, and pursuing enforcement actions. Section 2 covers the types of negotiations that commonly involve OSCs and RPMs. The characteristics of a negotiating style that satisfy all the parties as well as methods for preparing and conducting this type of negotiation are outlined. Section 3 deals with post-removal site control arrangements and other closeout requirements for a removal site, such as completing necessary paperwork. The remedial project closeout procedures also are covered, including the remedial closeout report, operation and maintenance (O ampersand M) arrangements, transfer of site responsibility, and deletion from the National Priorities List (NPL). Section 4 discusses the purpose, procedures, roles and responsibilities associated with records management under Superfund. Section 5 outlines the response authority provided by CERCLA to OCSs and RPMs

  10. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    1995-09-01

    The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link with other initiatives, such as improving management practices and the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE/RL-91-31). This document captures the results of decision making regarding the application of systems engineering at the Hanford Site, external involvement policy, and site end-state goals. Section 3.5 of the Hanford Mission Plan on Decisions and Directives provides an integrating discussion of the actions of the National Environmental Policy Act (NEPA), and DOE policy, guidance, and decisions associated with binding agreements such as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Two significant components of the Hanford Mission Plan 1994 planning basis are (1) the decisions regarding the disposition of onsite material inventory, and the key programs and interfaces to accomplish this; and (2) the Program Interface Issues section, which identified issues that stretch across program boundaries

  11. Annual report of decommissioning and remedial action S and M activities for the Environmental Management Program at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-11-01

    The Oak Ridge National Laboratory (ORNL) Surveillance and Maintenance (S ampersand M) Program performs a variety of activities to ensure that sites and facilities within its responsibility remain in a safe condition and in compliance with applicable regulations. All S ampersand M Program activities during fiscal year (FY) 1997 were accomplished safely, with no health and safety incidents, no lost work days, and no environmental noncompliances. In addition, all activities were performed within schedule thresholds and under budget. Many remedial action (RA) sites and decontamination and decommissioning (D ampersand D) facilities are inspected and maintained by the S ampersand M Program. RA sites encompass approximately 650 acres and 33 D ampersand D facilities, including 4 inactive reactors. During FY 1997, routine, preventative, and emergency maintenance activities were performed as needed at these sites and facilities. Stabilization activities were also performed to reduce risks and reduce future S ampersand M costs. Major activities at the RA sites during FY 1997 included maintaining proper liquid levels in surface impoundments and inactive -liquid low-level waste storage tanks as well as installing a new cover at the tumulus pads in Waste Area Grouping (WAG) 6, planting trees in the First Creek Riparian Corridor, and performing over 900 well inspections. Postremediation monitoring was conducted at the 3001 Canal, Core Hole 8, the WAG 6 Resource Conservation and Recovery caps, and WAG 5 Seeps C and D; groundwater monitoring was performed in WAGs 4, 5, and 6 and at the 3001 Canal Well. At ORNL D ampersand D facilities, significant accomplishments included contaminated lead brick removal, asbestos abatement, contaminated equipment and debris removal, and radiologically contaminated area painting

  12. Proposed training program for construction personnel involved in remedial action work at sites contaminated by naturally occurring radionuclides

    International Nuclear Information System (INIS)

    Berven, B.A.; Goldsmith, W.A.; Haywood, F.F.; Schiager, K.J.

    1979-01-01

    Many sites used during the early days of the US atomic energy program are contaminated with radionuclides of the primordial decay chains (uranium, thorium, and actinium series). This contamination consists of residues resulting from refining and processing uranium and thorium. Preparation of these sites for release to unrestricted private use will involve the assistance of construction workers, many of whom have limited knowledge of the hazards associated with radioactive materials. Therefore, there is a need to educate these workers in the fundamentals of radioactive material handling to minimize exposures and possible spread of contamination. This training should disseminate relevant information at an appropriate educational level and should instill a cautious, common-sense attitude toward the handling of radioactive materials. The training should emphasize basic information concerning environmental radiation within a context of relative risk. A multi-media format, including colorful visual aids, demonstration, and discussion, should be used to maximize motivation and retention. A detailed, proposed training program design is presented

  13. EVALUATION OF PILOT TREATMENT EFFLUENTS FROM SUMMITVILLE MINE, CO, USING CERIODAPHNIA DUBIA, FATHEAD MINNOW (PIMEPHALES PROMELAS), AND RAINBOW TROUT (ONCORHYNCHUS MYKISS) TOXICITY TESTS

    Science.gov (United States)

    As part of a Superfund Innovative Technology Evaluation (SITE) Program, the U.S. Environmental Protection Agency evaluated a remediation technology at the Summitville Mine Superfund site in southern Colorado. The technology evaluated was a successive alkalinity producing system ...

  14. Superfund Removal Site Points, Region 9, 2012, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of CERCLA (Superfund) Removal sites. CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act)...

  15. Case study: Montclair/West Orange and Glen Ridge Radium Superfund sites

    International Nuclear Information System (INIS)

    Pezzella, R.; Seppi, P.; Watson, D.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Radium Sites are located 12 miles west of New York City in three residential communities in Essex County, New Jersey. The sites are contaminated with waste materials from a local radium processing facility which ceased operations in 1926. Houses were subsequently constructed on or near the radium waste disposal areas. The waste material was also used as backfill, which caused contamination to be spread randomly over the communities. There are 769 properties between four townships that comprise the Superfund sites. The Environmental Protection Agency (EPA) conducted an aerial survey in 1981 which identified the boundaries of the sites. In 1985, the New Jersey Department of Environmental Protection (NJDEP) began a pilot study to examine the feasibility of excavation and off-site disposal of contaminated material as a permanent solution. The study was interrupted when the permit for the disposal site was revoked by the state of Nevada. Since 1990 field testing has been completed on over 725 properties and remediation and restoration has been completed on 75 properties

  16. Can standard sequential extraction determinations effectively define heavy metal species in superfund site soils?

    Energy Technology Data Exchange (ETDEWEB)

    Dahlin, Cheryl L.; Williamson, Connie A.; Collins, Wesley K.; Dahlin, David C.

    2001-01-01

    Speciation and distribution of heavy metals in soils controls the degree to which metals and their compounds are mobile, extractable, and plant-available. Consequently, speciation impacts the success of remediation efforts both by defining the relationship of the contaminants with their environment and by guiding development and evaluation of workable remediation strategies. The U.S. Department of Energy, Albany Research Center (Albany, OR), under a two-year interagency project with the U.S. Environmental Protection Agency (EPA), examined the suitability of sequential extraction as a definitive means to determine species of heavy metals in soil samples. Representative soil samples, contaminated with lead, arsenic, and/or chromium, were collected by EPA personnel from two Superfund sites, the National Lead Company site in Pedricktown, NJ, and the Roebling Steel, Inc., site in Florence, NJ. Data derived from Tessier=s standard three-stage sequential-extraction procedure were compared to data from a comprehensive characterization study that combined optical- and scanning-electron microscopy (with energy-dispersive x-ray and wavelength-dispersive x-ray analyses), x-ray diffraction, and chemical analyses. The results show that standard sequential-extraction procedures that were developed for characterizing species of contaminants in river sediments may be unsuitable for sole evaluation of contaminant species in industrial-site materials (particularly those that contain larger particles of the contaminants, encapsulated contaminants, and/or man-made materials such as slags, metals, and plastics). However, each sequential extraction or comprehensive characterization procedure has it=s own strengths and weaknesses. Findings of this study indicate that the use of both approaches, during the early stages of site studies, would be a best practice. The investigation also highlights the fact that an effective speciation study does not simply identify metal contaminants as

  17. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  18. Headquarters Air Force Logistics Command guidance manual for hazardous waste minimization (PACER REDUCE): Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    Jones, L.W.; Weeter, D.; Roth, J.A.; Debelak, K.A.; Bowers, A.R.

    1988-09-01

    This manual provides guidance for the Air Force Logistics Command (AFLC) Waste Minimization Program, called PACER REDUCE, and applies to all AFLC installations and personel who are responsible for implementing and monitoring activities relating to PACER REDUCE. This guidance for waste minimization provides management and technical approaches for assessing potential waste reduction techniques and for making informed decisions concerning industrial process and waste stream management. Such actions will assist in achieving regulatory compliance with the Resource Conservation and Recovery Act of 1976 as updated by the Hazardous and Solid Waste Amendments of 1984. 37 refs., 14 figs., 22 tabs

  19. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  20. 78 FR 73525 - Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund...

    Science.gov (United States)

    2013-12-06

    ... Conservation and Recovery Act (RCRA). Many state programs also offer accompanying financial incentive programs... states and tribes that have the management and administrative capacity within their government required... identify the institutional controls relied on in the remedy and include relevant information concerning the...

  1. Superfund at work: Hazardous waste cleanup efforts nationwide, fall 1992. (Wide Beach section of Brant, New York)

    International Nuclear Information System (INIS)

    1992-01-01

    Wide-spread contamination of polychlorinated biphenyls (PCBs) threatened the Wide Beach section of Brant, New York, a popular vacation resort. EPA's Superfund program effectively completed a permanent cleanup of Wide Beach in the span of one year. Other highlights included: a new and innovative technology to remove PCB contamination; reduction of PCBs to one-fifth of acceptable levels; temporary relocation of residents who were concerned for their health while cleanup activities took place; newly paved roads and driveways, re-landscaped yards, and a new storm sewer system; and restoration of ecologically sensitive wetlands. EPA's achievements significantly reduced PCB risks at Wide Beach, and left a satisfied community in Brant

  2. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords

  3. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  4. Mold: Cleanup and Remediation

    Science.gov (United States)

    ... National Center for Environmental Health (NCEH) Cleanup and Remediation Recommend on Facebook Tweet Share Compartir On This ... CDC and EPA on mold cleanup, removal and remediation. Cleanup information for you and your family Homeowner’s ...

  5. Uranium Mill Tailings Remedial Action Program. Partial radiological survey of Shiprock vicinity property SH13 Shiprock, New Mexico, November 1982

    International Nuclear Information System (INIS)

    Flynn, K.F.; Justus, A.L.; Sholeen, C.M.; Smith, W.H.; Wynveen, R.A.

    1984-05-01

    As part of a detailed radiological assessment of the vicinity properties at Shiprock, a comprehensive survey of the vicinity property designated as SH13 was initiated on November 19, 1982. At that time, a single residential structure existed in the northwest corner of the property. The lands surrounding the structure were extensively cluttered with junk. The initial assessment activities were limited to measurements within the residential structure of the ambient external penetrating radiation level at a 1-meter height and analyses of indoor air samples for airborne radioactivity. The external penetrating radiation exposure rate (12.3 μR/h) was less than the 20 μR/h above background limit specified in the EPA Standard (40 CFR 192.12[b][2]). As determined by the air samples, the short-term radon daughter concentration within the structure (0.36 mWL) did not exceed the 0.02 WL (or 20 mWL) limit for average annual concentration including background as specified in the EPA Standard. Further measurements required to completely determine the radiological status of this vicinity property, such as measurements of surface radiation both indoors and outdoors and collection and analyses of soil samples, were planned for the final phase of this assessment. However, that phase of the program was terminated before these measurements were accomplished. Thus, the extent of outdoor radiological contamination is presently unknown, and the evaluation of indoor contamination (if any) is incomplete

  6. Hazelwood Interim Storage Site, Hazelwood, Missouri: Annual site environmental report, Calendar year 1987: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1988-04-01

    The monitoring program at the HISS measures radon concentrations in air; external gamma radiation levels; and uranium, radium, and thorium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and assess its potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the scenario described in this report, the maximally exposed individual at the HISS would receive an annual external exposure approximately equivalent to 1 percent of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (because of the greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the HISS that would result from radioactive materials present at the site would be indistinguishable from the dose that the same population would receive from naturally occurring radioactive sources. The results of 1987 monitoring show that the HISS is in compliance with the DOE radiation protection standard. 12 refs., 6 figs., 11 tabs

  7. Topical Day on Site Remediation

    Energy Technology Data Exchange (ETDEWEB)

    Vandenhove, H [ed.

    1996-09-18

    Ongoing activities at the Belgian Nuclear Research Centre relating to site remediation and restoration are summarized. Special attention has been paid to the different phases of remediation including characterization, impact assessment, evaluation of remediation actions, and execution of remediation actions.

  8. Remedial action technology - arid

    International Nuclear Information System (INIS)

    Hakonson, T.E.; DePoorter, G.L.; Nyhan, J.W.; Perkins, B.A.; Lane, L.J.

    1982-01-01

    A summary is presented of the low-level waste remedial action program at Los Alamos. The experimental design and progress is described for the experiments on second generation intrusion barriers, subsidence effects on SLB components, moisture cycling effects on chemical transport, and erosion control methodologies. The soil moisture data from the bio-intrusion and moisture cycling experiments both demonstrate the overwhelming importance of vegetation in minimizing infiltration of water through trench covers and backfill. Evaporation, as a water loss component in trench covers, is only effective in reducing soil moisture within 40 cm of the trench cover surface. Moisture infiltrating past the zone of evaporation in unvegetated or poorly vegetated trench covers is in storage and accumulates until drainage out of the soil profile occurs. Judicious selection of vegetation species for revegetating a low-level waste site may prevent infiltration of moisture into the trench and, when coupled with other design features (i.e. trench cover slope, tilling and seeding practice), may greatly reduce problems with erosion. Standard US Department of Agriculture erosion plots, when coupled with a state-of-the-art water balance and erosion model (CREAMS) promises to be highly useful in screening proposed remedial action cover designs for low-level waste sites. The erosion plot configuration allows for complete accounting of the water balance in a soil profile. This feature enables the user to optimize cover designs to minimize erosion and infiltration of water into the trench

  9. 40 CFR 35.4040 - How many groups can receive a TAG at one Superfund site?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false How many groups can receive a TAG at one Superfund site? 35.4040 Section 35.4040 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Eligible? § 35.4040 How many groups can receive a TAG at one Superfund site? (a) Only one TAG may be...

  10. 77 FR 11533 - Anniston PCB Superfund Site, Anniston, Calhoun County, Alabama; Notice of Amended Settlement

    Science.gov (United States)

    2012-02-27

    ... ENVIRONMENTAL PROTECTION AGENCY [CERCLA-04-2012-3763; FRL 9637-7] Anniston PCB Superfund Site... past response costs concerning the Anniston PCB Superfund Site located in Anniston, Calhoun County.... Submit your comments by Site name Anniston PCB by one of the following methods: www.epa.gov/region4...

  11. Smart moves in superfund - revitalization one year later. Volume 1, Number 3, January 1993. Bulletin

    International Nuclear Information System (INIS)

    1993-01-01

    The issue of the Smart Moves in Superfund bulletin series provides an update on the revitalization effort, highlighting National Priorities List (NPL) construction completions, accelerating cleanup, the Superfund Accelerated Cleanup Model, risk assessment/risk management, contracts management, enforcement policy/equity, interagency cooperation, public forms, and state meetings

  12. 77 FR 16548 - Florida Petroleum Reprocessors Superfund Site; Davie, Broward County, FL; Notice of Settlements

    Science.gov (United States)

    2012-03-21

    ...-2012- 3766; CERCLA-04-2012-3765] Florida Petroleum Reprocessors Superfund Site; Davie, Broward County... costs concerning the Florida Petroleum Reprocessors Superfund Site located in Davie, Broward County.... Painter. Submit your comments by Site name Florida Petroleum Reprocessors by one of the following methods...

  13. 78 FR 729 - Ellman Battery Superfund Site; Orlando, Orange County, FL; Notice of Settlement

    Science.gov (United States)

    2013-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9767-6; CERCLA-04-2012-3780] Ellman Battery Superfund Site; Orlando, Orange County, FL; Notice of Settlement AGENCY: Environmental Protection Agency (EPA). ACTION... Action at the Ellman Battery Superfund Site located in Orlando, Orange County, Florida. DATES: The Agency...

  14. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites

  15. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  16. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  17. Uranium Mill Tailings Remedial Action Program. Partial radiological survey of Shiprock vicinity property SH14 Shiprock, New Mexico, October-November 1982

    International Nuclear Information System (INIS)

    Flynn, K.F.; Justus, A.L.; Sholeen, C.M.; Smith, W.H.; Wynveen, R.A.

    1984-06-01

    As part of a detailed radiological assessment of the vicinity properties at Shiprock, a comprehensive survey of the vicinity property designated as SH14 was initiated during October and November 1982. At the time of the survey, vicinity property SH14 consisted of about 20 acres of open lands to the northeast of, and directly across the San Juan River from, the upper tailings pile at Shiprock. The lands consisted of a sandy soil, sparsley covered with trees and other vegetation. The partial assessment activities included determination of surface radiation levels on about a 2-meter grid spacing through direct instrument surveys and analysis of a soil sample collected from the area. The partial radiological assessment indicated elevated levels of radioactivity at several general areas within the open lands. Radiochemical analyses of the soil sample collected from one of these areas indicated a radium concentration of 18 +- 2 pCi/g, which is in excess of the limit of 5 pCi/g above background, averaged over the first 15 cm of soil below the surface, as specified in the EPA Standard (40 CFR 192). Subsurface soil sampling was not conducted, and thus the vertical extent of the radiological contamination is not known. Further measurements required to completely determine and accurately report the radiological status of this vicinity property, including additional direct instrument surveys, collection and analyses of soil samples, and the establishment of a 200-ft grid system, were planned for the final phase of this assessment. However, that phase of the program was cancelled before these measurements were accomplished. The total extent of the radiological contamination of vicinity property SH14 is presently unknown. Nonetheless, since the surface soil contamination levels exceeded the limits specified in the EPA Standard, remedial action for this vicinity site should be considered

  18. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  19. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  20. RCRA corrective action ampersand CERCLA remedial action reference guide

    International Nuclear Information System (INIS)

    1994-07-01

    This reference guide provides a side-by-side comparison of RCRA corrective action and CERCLA Remedial Action, focusing on the statutory and regulatory requirements under each program, criterial and other factors that govern a site's progress, and the ways in which authorities or requirements under each program overlap and/or differ. Topics include the following: Intent of regulation; administration; types of sites and/or facilities; definition of site and/or facility; constituents of concern; exclusions; provisions for short-term remedies; triggers for initial site investigation; short term response actions; site investigations; remedial investigations; remedial alternatives; clean up criterial; final remedy; implementing remedy; on-site waste management; completion of remedial process

  1. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  2. What is the Prevalence and Success of Remediation of Emergency Medicine Residents?

    OpenAIRE

    Silverberg, Mark; Weizberg, Moshe; Murano, Tiffany; Smith, Jessica L.; Burkhardt, John C.; Santen, Sally A.

    2015-01-01

    Introduction: The primary objective of this study was to determine the prevalence of remediation, competency domains for remediation, the length, and success rates of remediation in emergency medicine (EM). Methods: We developed the survey in SurveymonkeyTM with attention to content and response process validity. EM program directors responded how many residents had been placed on remediation in the last three years. Details regarding the remediation were collected inclu...

  3. WORKSHOP ON THE CHARACTERIZATION, MODELING, REMEDIATION AND MONITORING OF MINING-IMPACTED PIT LAKES, SANDS RGENCY CASINO HOTEL, DOWNTOWN RENO, NV. APRIL 4-6, 2000 (PROGRAM FLYER)

    Science.gov (United States)

    The purpose of this workshop is to provide a forum for the exchange of scientific infomation on current approaches for assessing the characterization, monitoring, treatment and/or remediation of impacts on aquatic ecosystems including pit lakes from mining-related contamination i...

  4. Does the Computer-Assisted Remedial Mathematics Program at Kearny High School Lead to Improved Scores on the N.J. Early Warning Test?

    Science.gov (United States)

    Schalago-Schirm, Cynthia

    Eighth-grade students in New Jersey take the Early Warning Test (EWT), which involves reading, writing, and mathematics. Students with EWT scores below the state level of competency take a remedial mathematics course that provides students with computer-assisted instruction (2 days per week) as well as regular classroom instruction (3 days per…

  5. MICHIGAN SOIL VAPOR EXTRACTION REMEDIATION (MISER) MODEL: A COMPUTER PROGRAM TO MODEL SOIL VAPOR EXTRACTION AND BIOVENTING OF ORGANIC CHEMICALS IN UNSATURATED GEOLOGICAL MATERIAL

    Science.gov (United States)

    Soil vapor extraction (SVE) and bioventing (BV) are proven strategies for remediation of unsaturated zone soils. Mathematical models are powerful tools that can be used to integrate and quantify the interaction of physical, chemical, and biological processes occurring in field sc...

  6. Remedial action of radium contaminated residential properties

    International Nuclear Information System (INIS)

    White, D.; Eng, J.

    1986-01-01

    Since November 1983, the New Jersey Department of Environmental Protection (NJDEP) and the US Environmental Protection Agency (USEPA) have been in the process of identifying properties in Montclair, Glen Ridge and West Orange, New Jersey, which were built over radium contaminated soil landfilled areas. Elevated indoor radon concentrations prompted the Centers for Disease Control (CDC) to issue a health advisory which included permanent remediation of radon progeny levels in excess of 0.02 Working Levels within two years of discovery. In order to expedite remedial action, NJDEP undertook a ten million dollar cleanup program. Remedial Action at the 12 residential properties encountered some unanticipated problems despite the efforts of numerous government agencies and their contractors to characterize the contamination as much as possible prior to remediation. Some of the unanticipated issues include contamination from other radionuclides, underestimation of removal volumes, and controversy over the transportation and disposal of the radium contaminated soil at a commercial facility in Nevada. This paper will review the approach taken by NJDEP to the remedial action for radium contaminated soil, discuss some of the issues encountered during the remedial action, and provide post remedial action data

  7. Proceedings of the remediation technologies symposium 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This conference provided a forum to discuss the remediation of contaminated sites. It was attended by all industry sectors that have an interest in learning about technical issues in environmental remediation research and the latest innovations in soil and groundwater remediation and industrial pollutant treatments. Cost effective in-situ and ex-situ soil reclamation strategies were presented along with groundwater and surface water remediation strategies. The diversified sessions at this conference were entitled: regulatory update; Montreal Centre of Excellence in Brownfields Rehabilitation; soil and groundwater remediation through the Program of Energy Research and Development at Environment Canada; technology from the Netherlands; bioremediation; hydrocarbons; in-situ remediation; phytoremediation; salt management; unique locations; and, miscellaneous issues. Some areas and case studies covered in the presentations included: biological and non-biological treatments; thermal desorption; encapsulation; natural attenuation; multi-phase extraction; electrochemical remediation; and membrane technology. The conference featured 63 presentations, of which 23 have been catalogued separately for inclusion in this database. tabs., figs.

  8. Proceedings of the remediation technologies symposium 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This conference provided a forum to discuss the remediation of contaminated sites. It was attended by all industry sectors that have an interest in learning about technical issues in environmental remediation research and the latest innovations in soil and groundwater remediation and industrial pollutant treatments. Cost effective in-situ and ex-situ soil reclamation strategies were presented along with groundwater and surface water remediation strategies. The diversified sessions at this conference were entitled: regulatory update; Montreal Centre of Excellence in Brownfields Rehabilitation; soil and groundwater remediation through the Program of Energy Research and Development at Environment Canada; technology from the Netherlands; bioremediation; hydrocarbons; in-situ remediation; phytoremediation; salt management; unique locations; and, miscellaneous issues. Some areas and case studies covered in the presentations included: biological and non-biological treatments; thermal desorption; encapsulation; natural attenuation; multi-phase extraction; electrochemical remediation; and membrane technology. The conference featured 63 presentations, of which 23 have been catalogued separately for inclusion in this database. tabs., figs

  9. Pump-and-treat is not the only solution to aquifer remediation

    International Nuclear Information System (INIS)

    Odermatt, J.R.

    1994-01-01

    The Environmental Protection Agency (EPA) recently surveyed remediation technologies used at petroleum-contaminated sites in 22 states. About 96 percent of underground storage tank (UST) corrective action sites used some form of pump-and-treat technology to remediate contaminated groundwater. However, using only pump-and-treat technology is not a cost-effective approach to aquifer remediation. Pump-and-treat may be more appropriate for containing plumes or for use in initial emergency response actions at sites and massive NAPL releases to groundwater. As of 1990, 68 percent of Superfund records of decision selected pump-and-treat as the final remedy for aquifer remediation. However, of 13 sites where the remedial alternative objective was to restore the aquifer to health-based levels, only one pump-and-treat method has succeeded. Except in cases where human health and the environment are threatened, long-term active technologies, such as pump-and-treat, may not be warranted. Groundwater monitoring and possible wellhead treatment may be perceived as time-consuming processes; however, at many sites, this long-term approach may be far less costly and just as effective as other long-term strategies based on exclusive use of pump-and-treat technology

  10. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  11. Tank waste remediation system mission analysis report

    International Nuclear Information System (INIS)

    Acree, C.D.

    1998-01-01

    The Tank Waste Remediation System Mission Analysis Report identifies the initial states of the system and the desired final states of the system. The Mission Analysis Report identifies target measures of success appropriate to program-level accomplishments. It also identifies program-level requirements and major system boundaries and interfaces

  12. Efficient analysis using custom interactive visualization tools at a Superfund site

    International Nuclear Information System (INIS)

    Williams, G.; Durham, L.

    1992-01-01

    Custom visualization analysis programs were developed and used to analyze contaminant transport calculations from a three-dimensional numerical groundwater flow model developed for a Department of Energy Superfund site. The site hydrogeology, which is highly heterogenous, includes both fractured limestone and dolomite and alluvium deposits. Three-dimensional interactive visualization techniques were used to understand and analyze the three-dimensional, double-porosity modeling results. A graphical object oriented programming environment was applied to efficiently develop custom visualization programs in a coarse-grained data structure language. Comparisons were made, using the results from the three-dimensional, finite-difference model, between traditional two-dimensional analyses (contour and vector plots) and interactive three-dimensional techniques. Subjective comparison areas include the accuracy of analysis, the ability to understand the results of three-dimensional contaminant transport simulation, and the capability to transmit the results of the analysis to the project management. In addition, a quantitative comparison was made on the time required to develop a thorough analysis of the modeling results. The conclusions from the comparative study showed that the visualization analysis provided an increased awareness of the contaminant transport mechanisms, provided new insights into contaminant migration, and resulted in a significant time savings

  13. Efficient analysis using custom interactive visualization tools at a Superfund site

    Energy Technology Data Exchange (ETDEWEB)

    Williams, G. [Northwestern Univ., Evanston, IL (United States); Durham, L. [Argonne National Lab., IL (United States)

    1992-12-01

    Custom visualization analysis programs were developed and used to analyze contaminant transport calculations from a three-dimensional numerical groundwater flow model developed for a Department of Energy Superfund site. The site hydrogeology, which is highly heterogenous, includes both fractured limestone and dolomite and alluvium deposits. Three-dimensional interactive visualization techniques were used to understand and analyze the three-dimensional, double-porosity modeling results. A graphical object oriented programming environment was applied to efficiently develop custom visualization programs in a coarse-grained data structure language. Comparisons were made, using the results from the three-dimensional, finite-difference model, between traditional two-dimensional analyses (contour and vector plots) and interactive three-dimensional techniques. Subjective comparison areas include the accuracy of analysis, the ability to understand the results of three-dimensional contaminant transport simulation, and the capability to transmit the results of the analysis to the project management. In addition, a quantitative comparison was made on the time required to develop a thorough analysis of the modeling results. The conclusions from the comparative study showed that the visualization analysis provided an increased awareness of the contaminant transport mechanisms, provided new insights into contaminant migration, and resulted in a significant time savings.

  14. Formerly Utilized MED/AEC Sites Remedial Action Program. Project management plan for the decontamination of Jones Laboratory, Ryerson Physical Laboratory, and Eckhart Hall, the University of Chicago, Chicago, Illinois

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, K.F.; Smith, W.H.; Wynveen, R.A.

    1984-01-01

    The Department of Energy (DOE) has in place a plan for the decontamination and decommissioning of contaminated sites that had been formerly utilized by the Manhattan Engineering District (MED) and/or the Atomic Energy Commission. This plan is referred to as the Formerly Utilized Sites Remedial Action Program (FUSRAP). Among these sites are Jones Laboratory, Ryerson Physical Laboratory and Eckhart Hall of The University of Chicago at Chicago, Illinois. This document represents the Project Management Plan for the decontamination of these facilities. 13 references, 3 figures, 1 table.

  15. Formerly Utilized MED/AEC Sites Remedial Action Program. Project management plan for the decontamination of Jones Laboratory, Ryerson Physical Laboratory, and Eckhart Hall, the University of Chicago, Chicago, Illinois

    International Nuclear Information System (INIS)

    Flynn, K.F.; Smith, W.H.; Wynveen, R.A.

    1984-01-01

    The Department of Energy (DOE) has in place a plan for the decontamination and decommissioning of contaminated sites that had been formerly utilized by the Manhattan Engineering District (MED) and/or the Atomic Energy Commission. This plan is referred to as the Formerly Utilized Sites Remedial Action Program (FUSRAP). Among these sites are Jones Laboratory, Ryerson Physical Laboratory and Eckhart Hall of The University of Chicago at Chicago, Illinois. This document represents the Project Management Plan for the decontamination of these facilities. 13 references, 3 figures, 1 table

  16. Remediation of problematic residents--A national survey.

    Science.gov (United States)

    Bhatti, Nasir I; Ahmed, Aadil; Stewart, Michael G; Miller, Robert H; Choi, Sukgi S

    2016-04-01

    Despite careful selection processes, residency programs face the challenge of training residents who fall below minimal performance standards. Poor performance of a resident can endanger both patient safety and the reputation of the residency program. It is important, therefore, for a program to identify such residents and implement strategies for their successful remediation. The purpose of our study was to gather information on evaluation and remediation strategies employed by different otolaryngology programs. Cross-sectional survey. We conducted a national survey, sending a questionnaire to the program directors of 106 otolaryngology residency programs. We collected information on demographics of the program, identification of problematic residents, and remediation strategies. The response rate was 74.5%, with a 2% cumulative incidence of problematic residents in otolaryngology programs during the past 10 years. The most frequently reported deficiencies of problematic residents were unprofessional behavior with colleagues/staff (38%), insufficient medical knowledge (37%), and poor clinical judgment (34%). Personal or professional stress was the most frequently identified underlying problem (70.5%). Remediation efforts included general counseling (78%), frequent feedback sessions (73%), assignment of a mentor (58%), and extra didactics (47%). These remediation efforts failed to produce improvement in 23% of the identified residents, ultimately leading to their dismissal. The apparent deficiencies, underlying causes, and remediation strategies vary among otolaryngology residency programs. Based on the results of this survey, we offer recommendations for the early identification of problematic residents and a standardized remediation plan. NA. © 2015 The American Laryngological, Rhinological and Otological Society, Inc.

  17. Electrodialytic soil remediation

    DEFF Research Database (Denmark)

    Karlsmose, Bodil; Ottosen, Lisbeth M.; Hansen, Lene

    1999-01-01

    The paper gives an overview of how heavy metals can be found in the soil and the theory of electrodialytic remediation. Basically electrodialytic remediation works by passing electric current through the soil, and the heavy metals in ionic form will carry some of the current. Ion-exchange membranes...... prevents the protons and the hydroxides ions from the electrode processes to enter the soil. The heavy metals are collected in a concentration compartment, which is separated from the soil by ion-exchange membranes. Examples from remediation experiments are shown, and it is demonstrated that it is possible...... to remediate soil polluted with heavy metals be this method. When adding desorbing agents or complexing agents, chosing the right current density, electrolyte and membranes, the proces can be optimised for a given remediation situation. Also electroosmosis is influencing the system, and if extra water...

  18. 49 CFR 25.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-10-01

    ... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 25.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the...

  19. 22 CFR 146.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-04-01

    ... THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 146.110 Remedial and affirmative action and self-evaluation. (a) Remedial action. If the...

  20. Applicable or Relevant and Appropriate Requirements (ARARs) for Remedial Action at the Oak Ridge Reservation: A compendium of major environmental laws. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Etnier, E.L.; McDonald, E.P.; Houlberg, L.M.

    1993-07-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances must comply with applicable or relevant and appropriate requirements (ARARS) or standards under federal and state environmental laws. The US Department of Energy (DOE) Oak Ridge Reservation (ORR) was placed on the National Priorities List by the US Environmental Protection Agency (EPA) on November 21, 1989, effective December 21, 1989. As a result of this listing, DOE, EPA, and the Tennessee Department of Environment and Conservation have signed a Federal Facility Agreement (FFA) for the environmental restoration of the ORR. Section XXI(F) of the FFA calls for the preparation of a draft listing of all ARARs as mandated by CERCLA {section}121. This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at the ORR. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Tennessee are listed in tables. In addition, the major provisions of the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Clean Water Act, the Clean Air and other acts, as they apply to hazardous waste cleanup, are discussed. In the absence of ARARS, CERCLA {section}121 provides for the use of nonpromulgated federal criteria, guidelines, and advisories in evaluating the human risk associated with remedial action alternatives. Such nonpromulgated standards are classified as ``to-be-considered`` (TBC) guidance. A ion of available guidance is given; summary tables fist the available federal standards and guidance information. In addition, the substantive contents of the DOE orders as they apply to remediation of radioactively contaminated sites are discussed as TBC guidance.

  1. The Positive Impacts Of American Reinvestment And Recovery Act (ARRA) Funding To The Waste Management Program On Hanford's Plateau Remediation Project

    International Nuclear Information System (INIS)

    Blackford, L.T.

    2010-01-01

    In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Central Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.

  2. Guidance: Strategies to Achieve Timely Settlement and Implementation of RD/RA at Superfund Sites

    Science.gov (United States)

    Memorandum recommends strategies to encourage PRPs to enter into a settlement using the model RD/RA Consent Decree; discusses the current model UAO; and suggests practical alternatives to expedite Superfund settlements and the cleanup process.

  3. Renton's Quendall Terminals on List of EPA Superfund Sites Targeted for Immediate, Intense Attention

    Science.gov (United States)

    EPA released the list of Superfund sites that Administrator Pruitt has targeted for intense and immediate attention, including the Quendall Terminals Site, a former creosote facility on the shore of Lake Washington in Renton, Washington.

  4. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse...

  5. Cleanups In My Community (CIMC) - Federal facilities that are also Superfund sites, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — Federal facilities are properties owned by the federal government. This data layer provides access to Federal facilities that are Superfund sites as part of the CIMC...

  6. Towards identifying the next generation of superfund and hazardous waste site contaminants

    Science.gov (United States)

    Ela, Wendell P.; Sedlak, David L.; Barlaz, Morton A.; Henry, Heather F.; Muir, Derek C.G.; Swackhamer, Deborah L.; Weber, Eric J.; Arnold, Robert G.; Ferguson, P. Lee; Field, Jennifer A.; Furlong, Edward T.; Giesy, John P.; Halden, Rolf U.; Henry, Tala; Hites, Ronald A.; Hornbuckle, Keri C.; Howard, Philip H.; Luthy, Richard G.; Meyer, Anita K.; Saez, A. Eduardo; vom Saal, Frederick S.; Vulpe, Chris D.; Wiesner, Mark R.

    2011-01-01

    Background This commentary evolved from a workshop sponsored by the National Institute of Environmental Health Sciences titled "Superfund Contaminants: The Next Generation" held in Tucson, Arizona, in August 2009. All the authors were workshop participants.

  7. A method for estimating the local area economic damages of Superfund waste sites

    International Nuclear Information System (INIS)

    Walker, D.R.

    1992-01-01

    National Priority List (NPL) sites, or more commonly called Superfund sites, are hazardous waste sites (HWS) deemed by the Environmental Protection Agency (EPA) to impose the greatest risks to human health or welfare or to the environment. HWS are placed and ranked for cleanup on the NPL based on a score derived from the Hazard Ranking System (HRS), which is a scientific assessment of the health and environmental risks posed by HWS. A concern of the HRS is that the rank of sites is not based on benefit-cost analysis. The main objective of this dissertation is to develop a method for estimating the local area economic damages associated with Superfund waste sites. Secondarily, the model is used to derive county-level damage estimates for use in ranking the county level damages from Superfund sites. The conceptual model used to describe the damages associated with Superfund sites is a household-firm location decision model. In this model assumes that households and firms make their location choice based on the local level of wages, rents and amenities. The model was empirically implemented using 1980 census microdata on households and workers in 253 counties across the US. The household sample includes data on the value and structural characteristics of homes. The worker sample includes the annual earnings of workers and a vector worker attributes. The microdata was combined with county level amenity data, including the number of Superfund sites. The hedonic pricing technique was used to estimate the effect of Superfund sites on average annual wages per household and on monthly expenditures on housing. The results show that Superfund sites impose statistically significant damages on households. The annual county damages from Superfund sites for a sample of 151 counties was over 14 billion dollars. The ranking of counties using the damage estimates is correlated with the rank of counties using the HRS

  8. Status report: Fernald site remediation

    International Nuclear Information System (INIS)

    Craig, J.R. Jr.; Saric, J.A.; Schneider, T.; Yates, M.K.

    1995-01-01

    The Fernald site is rapidly transitioning from a Remedial Investigation/ Feasibility Study (RI/FS) site to one where design and construction of the remedies dominates. Fernald is one of the first sites in the Department of Energy (DOE) complex to accomplish this task and real physical progress is being made in moving the five operable units through the CERCLA process. Two of the required Records of Decision (ROD) are in hand and all five operable units will have received their RODs (IROD for OU3) by the end of 1995. Pre-design investigations, design work or construction are now in progress on the operable units. The lessons learned from the work done to date include implementing innovations in the RI and FS process as well as effective use of Removal Actions to begin the actual site remediation. Also, forging close working relationships with the Federal and State Regulators, citizens action groups and the Fernald Citizens Task Force has helped move the program forward. The Fernald successes have been achieved by close coordination and cooperation among all groups working on the projects and by application of innovative technologies within the decision making process

  9. Ethical Issues in Using Children's Blood Lead Levels as a Remedial Action Objective

    Science.gov (United States)

    Evans, Emily Lorraine

    2011-01-01

    The Environmental Protection Agency measures the success or failure of Superfund site remediation efforts against remedial action objectives (RAOs). RAOs are frequently based on environmental contaminant concentrations, but with lead exposure, blood lead levels from the population at risk are often used. Although childhood lead screening is an important public health tool, an RAO based on child blood lead levels raises ethical concerns: public health efforts that are more reactive than preventive, a blood lead standard (10 μg/dL) that may not be fully protective, the use of a measure whose validity and reliability may be easily compromised, and exacerbation of environmental injustice and systematic disadvantages. The example of Bunker Hill mine, Kellogg, Idaho, allowed an examination of these ethical concerns. PMID:21836120

  10. Hazardous waste treatment and environmental remediation research

    International Nuclear Information System (INIS)

    1989-01-01

    Los Alamos National Laboratory (LANL) is currently evaluating hazardous waste treatment and environmental remediation technologies in existence and under development to determine applicability to remediation needs of the DOE facilities under the Albuquerque Operations Office and to determine areas of research need. To assist LANL is this effort, Science Applications International Corporation (SAIC) conducted an assessment of technologies and monitoring methods that have been demonstrated or are under development. The focus of this assessment is to: (1) identify existing technologies for hazardous waste treatment and environmental remediation of old waste sites; (2) identify technologies under development and the status of the technology; (3) assess new technologies that need development to provide adequate hazardous waste treatment and remedial action technologies for DOD and DOE sites; and (4) identify hazardous waste and remediation problems for environmental research and development. There are currently numerous research and development activities underway nationwide relating to environmental contaminants and the remediation of waste sites. To perform this effort, SAIC evaluated current technologies and monitoring methods development programs in EPA, DOD, and DOE, as these are the primary agencies through which developmental methods are being demonstrated. This report presents this evaluation and provides recommendations as to pertinent research needs or activities to address waste site contamination problems. The review and assessment have been conducted at a programmatic level; site-specific and contaminant-specific evaluations are being performed by LANL staff as a separate, related activity

  11. Technology development activities supporting tank waste remediation

    International Nuclear Information System (INIS)

    Bonner, W.F.; Beeman, G.H.

    1994-06-01

    This document summarizes work being conducted under the U.S. Department of Energy's Office of Technology Development (EM-50) in support of the Tank Waste Remediation System (TWRS) Program. The specific work activities are organized by the following categories: safety, characterization, retrieval, barriers, pretreatment, low-level waste, and high-level waste. In most cases, the activities presented here were identified as supporting tank remediation by EM-50 integrated program or integrated demonstration lead staff and the selections were further refined by contractor staff. Data sheets were prepared from DOE-HQ guidance to the field issued in September 1993. Activities were included if a significant portion of the work described provides technology potentially needed by TWRS; consequently, not all parts of each description necessarily support tank remediation

  12. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  13. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  14. Provincial labour market study : mould remediation industry

    International Nuclear Information System (INIS)

    2003-06-01

    Indoor exposure to mold can be problematic to human health, and some molds are considered to be toxigenic. The emergent mold remediation industry in Ontario is fragmented, with various different standards, training and certification processes. This report investigated the labour market for mold remediation workers, with particular reference to training needs and priorities. Research was derived from a literature review in order to analyze the economic, legal, technical and social context of the mold remediation industry. Data on the organized work force were obtained from records of the International Union of Painters and Allied Trades, the Labour Force Historical Review 2002, and various publications. Population data from the Ontario government and Statistics Canada were also used. Surveys of workers and employers were conducted with questionnaires. Results of the surveys indicated that mold remediation projects currently constitute a minority share of most companies' business. However, the importance of mold remediation projects is expected to increase, and industry self-regulation is the most likely scenario for the development of standards and related training programs. It was suggested that the creation of an industry body representing key stakeholder constituencies or the legitimization of an existing industry organization will reduce fragmentation and facilitate research, standard setting and certification, as well as improve marketing and education. If the demand for mold remediation services increases as anticipated, the industry will face the challenge of remaining competitive in the province's projected labour market due to shortages in personnel. There was a strong consensus between employers and workers in the mold remediation industry regarding the need for skills upgrading and compulsory certification. It was concluded that leadership is needed in the development and delivery of training programs, standard setting, recruitment and retention and

  15. Environmental restoration remedial action quality assurance requirements document

    International Nuclear Information System (INIS)

    Cote, R.F.

    1991-01-01

    The environmental Restoration Remedial Action Quality Assurance Requirements Document (DOE/RL 90-28) defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site, Richland, Washington. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency

  16. MGP site remediation: Working toward presumptive remedies

    International Nuclear Information System (INIS)

    Larsen, B.R.

    1996-01-01

    Manufactured Gas Plants (MGPs) were prevalent in the United States during the 19th and first half of the 20th centuries. MGPs produced large quantities of waste by-products, which varied depending on the process used to manufacture the gas, but most commonly were tars and polynuclear aromatic hydrocarbons. There are an estimated 3,000 to 5,000 abandoned MGP sites across the United States. Because these sites are not concentrated in one geographic location and at least three different manufacturing processes were used, the waste characteristics are very heterogeneous. The question of site remediation becomes how to implement a cost-effective remediation with the variety of cleanup technologies available for these sites. Because of the significant expenditure required for characterization and cleanup of MGP sites, owners and regulatory agencies are beginning to look at standardizing cleanup technologies for these sites. This paper discusses applicable cleanup technologies and the attitude of state regulatory agencies towards the use of presumptive remedies, which can reduce the amount of characterization and detailed analysis necessary for any particular site. Additionally, this paper outlines the process of screening and evaluating candidate technologies, and the progress being made to match the technology to the site

  17. Pilot-scale incineration of comtaminated soils from the drake chemical superfund site. Final report

    International Nuclear Information System (INIS)

    King, C.; Lee, J.W.; Waterland, L.R.

    1993-03-01

    A series of pilot-scale incineration tests were performed at the U.S. Environmental Protection Agency's (EPA's) Incineration Research Facility to evaluate the potential of incineration as an option to treat contaminated soils from the Drake Chemical Superfund site in Lock Haven, Pennsylvania. The soils at the Drake site are reported to be contaminated to varying degrees with various organic constituents and several hazardous constituent trace metals. The purpose of the test program was to evaluate the incinerability of selected site soils in terms of the destruction of contaminant organic constituents and the fate of contaminant trace metals. All tests were conducted in the rotary kiln incineration system at the IRF. Test results show that greater than 99.995 percent principal organic hazardous constituent (POHC) destruction and removal efficiencies (DRE) can be achieved at kiln exit gas temperatures of nominally 816 C (1,500 F) and 538 C (1,000 F). Complete soil decontamination of semivolatile organics was achieved; however, kiln ash levels of three volatile organic constituents remained comparable to soil levels

  18. Remedial design of the Fultz Landfill Site, Byesville, Ohio

    International Nuclear Information System (INIS)

    Rajaram, V.; Riesing, R.; Bloom, T.

    1994-01-01

    The Fultz Landfill Superfund (Fultz) site is a 30-acre hazardous waste landfill located near Byesville, Ohio. The site is approximately 75 miles east of Columbus and 3 miles southwest of Cambridge, the largest city in Guernsey County, Ohio. The landfill is situated on the north slope of a ridge that overlies abandoned coal mines in the Upper Freeport Coal seam. The north half of the landfill lies in an unreclaimed strip mine in the Upper Freeport Coal seam, where saturated portions of surface mine spoils and natural soils form the ''shallow aquifer''. The south half of the landfill lies 40 to 50 feet (ft.) above an abandoned, flooded deep mine in the same coal seam. The flooded deep mine forms an aquifer referred to as the ''coal mine aquifer''. This paper presents the results of design studies completed by PRC Environmental Management, Inc. (PRC), during 1993, and the remedial design (RD) of the components specified by the US Environmental Protection Agency (EPA) Record of Decision (ROD) for the Fultz site (EPA 1991). The remedy specified in the ROD includes a multilayer landfill cap that is compliant with Resource Conservation and Recovery Act (RCRA) Subtitle C guidelines, a leachate collection and groundwater extraction and treatment system, and stabilizing mine voids underlying the southern portion of the site. Vinyl chloride is the only contaminant exceeding a maximum contaminant limit (MCL) in the coal mine aquifer

  19. Environmental Remediation Data Management Tools

    International Nuclear Information System (INIS)

    Wierowski, J. V.; Henry, L. G.; Dooley, D. A.

    2002-01-01

    Computer software tools for data management can improve site characterization, planning and execution of remediation projects. This paper discusses the use of two such products that have primarily been used within the nuclear power industry to enhance the capabilities of radiation protection department operations. Advances in digital imaging, web application development and programming technologies have made development of these tools possible. The Interactive Visual Tour System (IVTS) allows the user to easily create and maintain a comprehensive catalog containing digital pictures of the remediation site. Pictures can be cataloged in groups (termed ''tours'') that can be organized either chronologically or spatially. Spatial organization enables the user to ''walk around'' the site and view desired areas or components instantly. Each photo is linked to a map (floor plan, topographical map, elevation drawing, etc.) with graphics displaying the location on the map and any available tour/component links. Chronological organization enables the user to view the physical results of the remediation efforts over time. Local and remote management teams can view these pictures at any time and from any location. The Visual Survey Data System (VSDS) allows users to record survey and sample data directly on photos and/or maps of areas and/or components. As survey information is collected for each area, survey data trends can be reviewed for any repetitively measured location or component. All data is stored in a Quality Assurance (Q/A) records database with reference to its physical sampling point on the site as well as other information to support the final closeout report for the site. The ease of use of these web-based products has allowed nuclear power plant clients to plan outage work from their desktop and realize significant savings with respect to dose and cost. These same tools are invaluable for remediation and decommissioning planning of any scale and for recording

  20. Salmon Site Remedial Investigation Report

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  1. Gamma Ray Imaging for Environmental Remediation

    Energy Technology Data Exchange (ETDEWEB)

    B.F. Philips; R.A. Kroeger: J.D. Kurfess: W.N. Johnson; E.A. Wulf; E. I. Novikova

    2004-11-12

    This program is the development of germanium strip detectors for environmental remediation. It is a collaboration between the Naval Research Laboratory and Lawrence Berkeley National Lab. The goal is to develop detectors that are simultaneously capable of excellent spectroscopy and imaging of gamma radiation.

  2. Phase 1 data summary report for the Clinch River Remedial Investigation: Health risk and ecological risk screening assessment. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Holladay, S.K.; Hook, L.A.; Levine, D.A.; Longman, R.C.; McGinn, C.W.; Skiles, J.L.; Suter, G.W.; Williams, L.F.

    1992-12-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants released from the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The contaminants released since the early 1940s include a variety of radionuclides, metals, and organic compounds. The purpose of this report is to summarize the results of Phase 1 of the CRRI. Phase 1 was designed to (1) obtain high-quality data to confirm existing historical data for contaminant levels in fish, sediment, and water from the CR/WBR; (2) determine the in the range of contaminant concentrations present river-reservoir system; (3) identify specific contaminants of concern; and (4) establish the reference (background) concentrations for those contaminants.

  3. Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

    International Nuclear Information System (INIS)

    Walker, Stuart

    2008-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions

  4. Synthesis of Research on Compensatory and Remedial Education.

    Science.gov (United States)

    Anderson, Lorin W.; Pellicer, Leonard O.

    1990-01-01

    Current Chapter 1 remedial and compensatory education programs may not be worth the substantial funds being poured into them. To address shortcomings, such programs should be upgraded, reconceptualized as educational (not funding) programs, and fully integrated into the total school program. Includes 14 references. (MLH)

  5. Formerly utilized MED/AEC sites Remedial Action Program. Report of the decontamination of Jones Chemical Laboratory, Ryerson Physical Laboratory, and Eckhart Hall, the University of Chicago, Chicago, Illinois

    International Nuclear Information System (INIS)

    Wynuveen, R.A.; Smith, W.H.; Sholeen, C.M.; Flynn, K.F.

    1984-08-01

    The US Department of Energy (DOE) has implemented a program to decontaminate radioactively contaminated sites that were formerly utilized by the Manhattan Engineer District (MED) and/or the Atomic Energy Commission (AEC) for activities that included handling of radioactive material. This program is referred to as the ''Formerly Utilized Sites Remedial Action Program'' (FUSRAP). Among these sites are Jones Chemical Laboratory, Ryerson Physical Laboratory, Kent Chemical Laboratory, and Eckhart Hall of The University of Chicago, Chicago, Illinois. Since 1977, the University of Chicago decontaminated Kent Chemical Laboratory as part of a facilities renovation program. All areas of Eckhart Hall, Ryerson Physical Laboratory, and Jones Chemical Laboratory that had been identified as contaminated in excess of current guidelines in the 1976-1977 surveys were decontaminated to levels where no contamination could be detected relative to natural backgrounds. All areas that required defacing to achieve this goal were restored to their original condition. The radiological evaluation of the sewer system, based primarily on the radiochemical analyses of sludge and water samples, indicated that the entire sewer system is potentially contaminated. While this evaluation was defined as part of this project, the decontamination of the sewer system was not included in the purview of this effort. The documentation included in this report substantiates the judgment that all contaminated areas identified in the earlier reports in the three structures included in the decontamination effort (Eckhart Hall, Ryerson Physical Laboratory, and Jones Chemical Laboratory) were cleaned to levels commensurate with release for unrestricted use

  6. To fail is human: remediating remediation in medical education.

    Science.gov (United States)

    Kalet, Adina; Chou, Calvin L; Ellaway, Rachel H

    2017-12-01

    Remediating failing medical learners has traditionally been a craft activity responding to individual learner and remediator circumstances. Although there have been moves towards more systematic approaches to remediation (at least at the institutional level), these changes have tended to focus on due process and defensibility rather than on educational principles. As remediation practice evolves, there is a growing need for common theoretical and systems-based perspectives to guide this work. This paper steps back from the practicalities of remediation practice to take a critical systems perspective on remediation in contemporary medical education. In doing so, the authors acknowledge the complex interactions between institutional, professional, and societal forces that are both facilitators of and barriers to effective remediation practices. The authors propose a model that situates remediation within the contexts of society as a whole, the medical profession, and medical education institutions. They also outline a number of recommendations to constructively align remediation principles and practices, support a continuum of remediation practices, destigmatize remediation, and develop institutional communities of practice in remediation. Medical educators must embrace a responsible and accountable systems-level approach to remediation if they are to meet their obligations to provide a safe and effective physician workforce.

  7. Eficácia terapêutica do programa de remediação fonológica em escolares com dislexia do desenvolvimento Therapeutic effectiveness of phonological remediation program in students with developmental dyslexia

    Directory of Open Access Journals (Sweden)

    Simone Aparecida Capellini

    2010-02-01

    Full Text Available OBJETIVOS: comparar os achados da avaliação em situação de pré e pós-testagem em escolares com dislexia do desenvolvimento e escolares bons leitores submetidos ao programa de remediação fonológica e verificar a eficácia terapêutica do programa de remediação fonológica em escolares com dislexia do desenvolvimento. MÉTODOS: participaram deste estudo 40 escolares de 2ª a 4ª série de ensino público do município de Marília-SP, de ambos os sexos, na faixa etária de 8 a 12 anos distribuídos em: GI: composto de 20 escolares com diagnóstico interdisciplinar de dislexia do desenvolvimento que foram submetidos a programa de remediação fonológica, GII: composto de 20 escolares sem dificuldades de aprendizagem da rede municipal de ensino público, pareados segundo sexo, faixa etária e escolaridade com os escolares do GI que não foram submetidos aos programas de remediação. Em situação de pré e pós-testagem, todos os escolares foram submetidos à aplicação do Teste de Desempenho Cognitivo-Linguístico nas versões coletiva e individual, seguido de leitura oral e compreensão de textos. RESULTADOS: foram evidenciadas diferenças estatisticamente significantes, indicando que os escolares do GI e GII submetidos ao programa de remediação fonológica apresentaram desempenho superior em situação de pós-testagem em comparação com a situação de pré-testagem para a maioria das habilidades cognitivo-linguísticas avaliadas, incluindo a leitura e compreensão de texto. CONCLUSÃO: o programa de remediação fonológica para crianças com e sem dislexia do desenvolvimento foi eficaz, sugerindo que a habilidade de relação letra-som deve ser utilizada em contexto de sala de aula favorecendo a leitura desses escolares.PURPOSES: to compare the findings of pre-test and post-test evaluation in students with developmental dyslexia and good readers submitted to phonological remediation program and to check the therapeutic

  8. 78 FR 47317 - Ore Knob Mine Superfund Site; Laurel Springs, Ashe County, North Carolina; Notice of Settlement

    Science.gov (United States)

    2013-08-05

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9843-3; CERCLA-04-2013-3759] Ore Knob Mine Superfund Site; Laurel Springs, Ashe County, North Carolina; Notice of Settlement AGENCY: Environmental Protection Agency... settlement with Herbert N. Francis concerning the Ore Knob Mine Superfund Site located in Laurel Springs...

  9. Tank waste remediation system retrieval and disposal mission infrastructure plan

    International Nuclear Information System (INIS)

    Root, R.W.

    1998-01-01

    This system plan presents the objectives, organization, and management and technical approaches for the Infrastructure Program. This Infrastructure Plan focuses on the Tank Waste Remediation System (TWRS) Project's Retrieval and Disposal Mission

  10. Uranium mill tailings remedial action technology

    International Nuclear Information System (INIS)

    Hartley, J.N.; Gee, G.W.

    1984-01-01

    The uranium milling process involves the hydrometallurgical extraction of uranium from ores and the resultant generation of large quantities of waste referred to as tailings. Uranium mill tailings have been identified as requiring remediation because they contain residual radioactive material that is not removed in the milling process. Potential radiation exposure can result from direct contact with the tailings, from radon gas emitted by the tailings, and from radioactive contamination of groundwater. As a result, the technology developed under the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP) and the US Nuclear Regulatory Commission (NRC) Uranium Recovery Program have focused on radon control, groundwater contamination and the long-term protection of the containment system. This paper briefly summarizes the UMTRAP and NRC remedial action technology development. 33 references, 9 figures, 5 tables

  11. Remediating a design tool

    DEFF Research Database (Denmark)

    Jensen, Mads Møller; Rädle, Roman; Klokmose, Clemens N.

    2018-01-01

    digital sticky notes setup. The paper contributes with a nuanced understanding of what happens when remediating a physical design tool into digital space, by emphasizing focus shifts and breakdowns caused by the technology, but also benefits and promises inherent in the digital media. Despite users......' preference for creating physical notes, handling digital notes on boards was easier and the potential of proper documentation make the digital setup a possible alternative. While the analogy in our remediation supported a transfer of learned handling, the users' experiences across technological setups impact......Sticky notes are ubiquitous in design processes because of their tangibility and ease of use. Yet, they have well-known limitations in professional design processes, as documentation and distribution are cumbersome at best. This paper compares the use of sticky notes in ideation with a remediated...

  12. Thermal soil remediation

    International Nuclear Information System (INIS)

    Nelson, D.

    1999-01-01

    The environmental properties and business aspects of thermal soil remediation are described. Thermal soil remediation is considered as being the best option in cleaning contaminated soil for reuse. The thermal desorption process can remove hydrocarbons such as gasoline, kerosene and crude oil, from contaminated soil. Nelson Environmental Remediation (NER) Ltd. uses a mobile thermal desorption unit (TDU) with high temperature capabilities. NER has successfully applied the technology to target heavy end hydrocarbon removal from Alberta's gumbo clay in all seasons. The TDU consist of a feed system, a counter flow rotary drum kiln, a baghouse particulate removal system, and a secondary combustion chamber known as an afterburner. The technology has proven to be cost effective and more efficient than bioremediation and landfarming

  13. Occurrences and fate of DDT principal isomers/metabolites, DDA, and o,p'-DDD enantiomers in fish, sediment and water at a DDT-impacted Superfund site.

    Science.gov (United States)

    Garrison, A W; Cyterski, M; Roberts, K D; Burdette, D; Williamson, J; Avants, J K

    2014-11-01

    In the 1950s and 60s, discharges from a DDT manufacturing plant contaminated a tributary system of the Tennessee River near Huntsville, Alabama, USA. Regulatory action resulted in declaring the area a Superfund site which required remediation and extensive monitoring. Monitoring data collected from 1988, after remediation, through 2011 showed annual decreases approximating first-order decay in concentrations of total DDT and its six principal congeners (p,p'-DDT, o,p'-DDT, p,p'-DDD, o,p'-DDD, p,p'-DDE and o,p'-DDE) in filets from three species of fish. As of 2013, these concentrations met the regulatory requirements of 5 mg/kg or less total DDT for each fish tested. The enantiomer fractions (EF) of chiral o,p'-DDD in smallmouth buffalo and channel catfish were always below 0.5, indicating preferential decay of the (+)-enantiomer of this congener; this EF did not change significantly over 15 years. The often-neglected DDT metabolite p,p'-DDA was found at a concentration of about 20 μg/l in the ecosystem water. Published by Elsevier Ltd.

  14. Superfund 16: Conference and exhibition proceedings. Volume 2

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This conference was held November 6--8, 1995 in Washington, D.C. The purpose of the conference was to provide a multidisciplinary forum dealing with state-of-the-art methods and site characterization technologies for environmental monitoring and remedial action planning of hazardous wastes. Individual papers have been processed separately for inclusion in the appropriate data bases

  15. Superfund 16: Conference and exhibition proceedings. Volume 1

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This conference was held November 6--8, 1995 in Washington, D.C. The purpose of the conference was to provide a multidisciplinary forum dealing with state-of-the-art methods and site characterization technologies for environmental monitoring and remedial action planning of hazardous wastes. Individual papers have been processed separately for inclusion in the appropriate data bases

  16. Electrodialytic soil remediation

    DEFF Research Database (Denmark)

    Hansen, Henrik K.; Ottosen, Lisbeth M.; Hansen, Lene

    1997-01-01

    It is not possible for all heavy metal polluted soils to remediate it by an applied electric field alone. A desorbing agent must in different cases be added to the soil in order to make the process possible or to make it cost effective......It is not possible for all heavy metal polluted soils to remediate it by an applied electric field alone. A desorbing agent must in different cases be added to the soil in order to make the process possible or to make it cost effective...

  17. Remedial design process for Montclair/West Orange and Glen Ridge radium sites

    International Nuclear Information System (INIS)

    MacIndoe, M.; Johnson, R.; Paez-Restrepo, A.; Wilkinson, S.; Hyman, M.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, New Jersey, are contaminated to varying degrees with radioactive materials. The waste materials originated from radium processing facilities prevalent in the area during the early 1900's. The two sites consist of 769 residential and commercial properties having a combined land area of approximately 210 acres. Historically, radioactive waste materials were disposed as landfill material in what were once rural areas. As development flourished, homes and streets were constructed over the landfilled waste. In 1981 the EPA conducted an aerial gamma radiation survey of the area to determine the presence of radioactive materials. It was from this survey that subsequent ground studies where initiated, and elevated gamma radiation and radon levels were discovered. The paper will discuss the methods used to obtain data through field investigations; the relationship between the interpretation of data to define the vertical and lateral limits of contamination and the selection of remedial design methods used to develop excavation plans; the evolution of remediation methods and technologies relative to the remediation of structures by underpinning basements, on-grade structures, and chimneys; removal of contaminated material beneath footings without cribbing; and demolition of basement foundation walls (where contaminated) without use of traditional support methods. Finally, the paper will discuss remedial action execution of the work

  18. Characterization and remediation of soil prior to construction of an on-site disposal facility at Fernald

    International Nuclear Information System (INIS)

    Hunt, A.; Jones, G.; Nelson, K.

    1998-03-01

    During the production years at the Feed Materials Production Center (FMPC), the soil of the site and the surrounding areas was surficially impacted by airborne contamination. The volume of impacted soil is estimated at 2.2 million cubic yards. During site remediation, this contamination will be excavated, characterized, and disposed of. In 1986 the US Environmental Protection Agency (EPA) and the Department of Energy (DOE) entered into a Federal Facility Compliance Agreement (FFCA) covering environmental impacts associated with the FMPC. A site wide Remedial Investigation/Feasibility Study (RI/FS) was initiated pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act (CERCLA). The DOE has completed the RI/FS process and has received approval of the final Records of Decision. The name of the facility was changed to the Fernald Environmental Management Project (FEMP) to emphasize the change in mission to environmental restoration. Remedial actions which address similar scopes of work or types of contaminated media have been grouped into remedial projects for the purpose of managing the remediation of the FEMP. The Soil Characterization and Excavation Project (SCEP) will address the remediation of FEMP soils, certain waste units, at- and below-grade material, and will certify attainment of the final remedial limits (FRLs) for the FEMP. The FEMP will be using an on-site facility for low level radioactive waste disposal. The facility will be an above-ground engineered structure constructed of geological material. The area designated for construction of the base of the on-site disposal facility (OSDF) is referred to as the footprint. Contaminated soil within the footprint must be identified and remediated. Excavation of Phase 1, the first of seven remediation areas, is complete

  19. An overview of the hazardous waste remedial actions program: hazardous and mixed waste activities for the U.S. Departments of energy and defense

    International Nuclear Information System (INIS)

    Craig, Robert B.; Rothermich, Nancy E.

    1991-01-01

    In May 1987 all mixed waste generated at the U.S. Department of Energy (DOE) facilities became jointly regulated by the U.S. Environmental Protection Agency (EPA) and DOE. The Department of Defense (DOD) generates hazardous wastes and is also regulated by the EPA. To maintain or attain compliance, both DOE and DOD have initiated compliance activities on all hazardous and mixed waste streams. This compliance includes the development of innovative technologies and processes to avoid the generation of hazardous and mixed wastes, development of technologies to treat the process wastes that are unavoidably generated, development of technologies to restore the environment where wastes have been released to the environment, the cleanup of asbestos and the monitoring of radon in federal facilities, the completion of remedial investigation/feasibility studies, and development of the data systems that are necessary to compile this information. This paper will describe each of these activities as they relate to compliance with the Resource Conservation and Recovery Act and/or CERCLA and their implementing regulations

  20. Uranium mill tailings remedial action program. Radiological survey of Shiprock vicinity property SH02 Shiprock, New Mexico, August-November 1984

    International Nuclear Information System (INIS)

    Flynn, K.F.; Justus, A.L.; Sholeen, C.M.; Smith, W.H.; Wynveen, R.A.

    1984-04-01

    A comprehensive survey of the vicinity property designated as SH02 was conducted on an intermittent basis from August 3 to November 11, 1982. At the time of the survey, seven structures were located on the property - two residential trailers, one institutional building, two institutional trailers, a storage building, and a pump house. The lands surrounding the structures were either sparsely covered with vegetation or gravelled. The assessment activities included determination of indoor and outdoor surface radiation levels through direct instrument surveys; measurement of ambient external penetrating radiation levels at 1-meter heights; and analysis of air and soil samples. No evidence of radioactive contamination was found inside the structures; background levels of radioactivity were indicated within all seven. The short-term radon daughter measurements did not exceed the limit of 0.02 Working Level for average annual concentration including background, as specified in the EPA Standard 40 CFR 192. The assessment indicated elevated levels of radioactivity at one general area in the outdoor environs, encompassing about 1400 ft 2 (130 m 2 ) of land along the property's northern boundary. Analysis of a surface soil sample collected from this area indicated a radium concentration considerably in excess of the limit of 5 pCi/g above background specified in the EPA Standard. Subsurface soil sampling was not conducted, and thus the vertical extent of the radiological contamination is not known. Since the surface soil contamination level exceeded the limit specified in the EPA Standard, remedial action for this vicinity site should be considered