WorldWideScience

Sample records for subpart ppp affected

  1. 40 CFR Table 4 to Subpart Ppp of... - Known Organic HAP From Polyether Polyol Products

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Known Organic HAP From Polyether Polyol... CATEGORIES National Emission Standards for Hazardous Air Pollutant Emissions for Polyether Polyols Production Pt. 63, Subpt. PPP, Table 4 Table 4 to Subpart PPP of Part 63—Known Organic HAP From Polyether Polyol...

  2. PPP in Denmark

    DEFF Research Database (Denmark)

    Kristiansen, Kristian

    2009-01-01

    It is the aim of the paper to contribute to the discussion on restating the PPP principles. The paper is based on an ongoing research project: ”Procuring Facilities Management through PPP´s”. A review of litterature with a critical, but positive attitude towards PPP is given. An overview of PPP...... in Denmark is presented. Only a few PPP´s have been initiated and though more might be in the pipeline, it is likely that the market for PPP is too small. Government policy is positive toward PPP. Private financing is not seen as an essential part of PPP. Attitudes among participants in PPP isare described...

  3. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  4. DRD2 and PPP1R1B (DARPP-32 polymorphisms independently confer increased risk for autism spectrum disorders and additively predict affected status in male-only affected sib-pair families

    Directory of Open Access Journals (Sweden)

    Hettinger Joe A

    2012-05-01

    Full Text Available Abstract Background The neurotransmitter dopamine (DA modulates executive functions, learning, and emotional processing, all of which are impaired in individuals with autism spectrum disorders (ASDs. Our previous findings suggest a role for dopamine-related genes in families with only affected males. Methods We examined two additional genes which affect DA function, the DRD2 and PPP1R1B (DARPP-32 genes, in a cohort of 112 male-only affected sib-pair families. Selected polymorphisms spanning these genes were genotyped and both family-based and population-based tests were carried out for association analysis. General discriminant analysis was used to examine the gene-gene interactions in predicting autism susceptibility. Results There was a significantly increased frequency of the DRD2 rs1800498TT genotype (P = 0.007 in affected males compared to the comparison group, apparently due to over-transmission of the T allele (P = 0.0003. The frequency of the PPP1R1B rs1495099CC genotype in affected males was also higher than that in the comparison group (P = 0.002 due to preferential transmission of the C allele from parents to affected children (P = 0.0009. Alleles rs1800498T and rs1495099C were associated with more severe problems in social interaction (P = 0.0002 and P = 0.0016, respectively and communication (P = 0.0004 and P = 0.0046, and increased stereotypic behaviours (P = 0.0021 and P = 0.00072. General discriminant analysis found that the DRD2 and PPP1R1B genes additively predicted ASDs (P = 0.00011; Canonical R = 0.26 and explain ~7% of the variance in our families. All findings remained significant following corrections for multiple testing. Conclusion Our findings support a role for the DRD2 and PPP1R1B genes in conferring risk for autism in families with only affected males and show an additive effect of these genes towards prediction of affected status in our families.

  5. PPP projects in transport

    DEFF Research Database (Denmark)

    Petersen, Ole Helby; Carpintero, Samuel

    2014-01-01

    Public–private partnerships (PPPs) have been extensively used in Spain for the procurement of light rail systems. This paper analyses five projects that have been in operation for more than five years. The authors examine the reasoning behind the selection of the PPP projects, risk......-sharing mechanisms, competition among private providers, and overall cost-effectiveness. The paper demonstrates a need for more rigorous assessments of the merits of PPP projects before they are initiated....

  6. 40 CFR Table 1 to Subpart Xxxx of... - Emission Limits for Tire Production Affected Sources

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Emission Limits for Tire Production Affected Sources 1 Table 1 to Subpart XXXX of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION.... 63, Subpt. XXXX, Table 1 Table 1 to Subpart XXXX of Part 63—Emission Limits for Tire Production...

  7. 40 CFR Table 3 to Subpart Xxxx of... - Emission Limits for Puncture Sealant Application Affected Sources

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Emission Limits for Puncture Sealant Application Affected Sources 3 Table 3 to Subpart XXXX of Part 63 Protection of Environment ENVIRONMENTAL... Manufacturing Pt. 63, Subpt. XXXX, Table 3 Table 3 to Subpart XXXX of Part 63—Emission Limits for Puncture...

  8. 40 CFR Table 2 to Subpart Xxxx of... - Emission Limits for Tire Cord Production Affected Sources

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Emission Limits for Tire Cord Production Affected Sources 2 Table 2 to Subpart XXXX of Part 63 Protection of Environment ENVIRONMENTAL... Manufacturing Pt. 63, Subpt. XXXX, Table 2 Table 2 to Subpart XXXX of Part 63—Emission Limits for Tire Cord...

  9. The PPP Puzzle

    DEFF Research Database (Denmark)

    Juselius, Katarina

    The persistent movements away from long-run benchmark values in real exchange rates, dubbed the PPP puzzle, observed in many real exchange rates during periods of currency float have been subject to much empirical research without resolving the puzzle. The paper demonstrates how the cointegrated...... VAR approach by grouping together components of similar persistence can be used to uncover structures in the data that ultimately may help to explain theoretically the forces underlying such puzzling movements. The charaterization of the data into components which are empirically I(0), I(1), and I(2......) is shown to be a powerful organizing principle allowing us to structure the data in long-run, medium-run, and short-run behavior. Its main advantage is the ability to associate persistent movements away from fundamental benchmark values in one variable/relation with similar persistent movements somewhere...

  10. 40 CFR Table 12 to Subpart Xxxx of... - Continuous Compliance With the Emission Limits for Tire Cord Production Affected Sources

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With the Emission Limits for Tire Cord Production Affected Sources 12 Table 12 to Subpart XXXX of Part 63 Protection of... Pollutants: Rubber Tire Manufacturing Pt. 63, Subpt. XXXX, Table 12 Table 12 to Subpart XXXX of Part 63...

  11. 40 CFR Table 14 to Subpart Xxxx of... - Continuous Compliance With the Emission Limitations for Puncture Sealant Application Affected...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With the Emission Limitations for Puncture Sealant Application Affected Sources 14 Table 14 to Subpart XXXX of Part 63... Hazardous Air Pollutants: Rubber Tire Manufacturing Pt. 63, Subpt. XXXX, Table 14 Table 14 to Subpart XXXX...

  12. 40 CFR Table 10 to Subpart Xxxx of... - Continuous Compliance With the Emission Limits for Tire Production Affected Sources

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With the Emission Limits for Tire Production Affected Sources 10 Table 10 to Subpart XXXX of Part 63 Protection of... Pollutants: Rubber Tire Manufacturing Pt. 63, Subpt. XXXX, Table 10 Table 10 to Subpart XXXX of Part 63...

  13. 40 CFR Table 6 to Subpart Xxxx of... - Initial Compliance With the Emission Limits for Tire Production Affected Sources

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Initial Compliance With the Emission Limits for Tire Production Affected Sources 6 Table 6 to Subpart XXXX of Part 63 Protection of... Pollutants: Rubber Tire Manufacturing Pt. 63, Subpt. XXXX, Table 6 Table 6 to Subpart XXXX of Part 63—Initial...

  14. 40 CFR Table 7 to Subpart Xxxx of... - Initial Compliance With the Emission Limits for Tire Cord Production Affected Sources

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Initial Compliance With the Emission Limits for Tire Cord Production Affected Sources 7 Table 7 to Subpart XXXX of Part 63 Protection of... Pollutants: Rubber Tire Manufacturing Pt. 63, Subpt. XXXX, Table 7 Table 7 to Subpart XXXX of Part 63—Initial...

  15. Improving Sustainability Performance for Public-Private-Partnership (PPP Projects

    Directory of Open Access Journals (Sweden)

    Liyin Shen

    2016-03-01

    Full Text Available Improving sustainability performance in developing infrastructure projects is an important strategy for pursuing the mission of sustainable development. In recent years, the business model of public-private-partnership (PPP is promoted as an effective approach in developing infrastructure projects. It is considered that the distribution of the contribution on project investment between private and public sectors is one of the key variables affecting sustainability performance of PPP-type projects. This paper examines the impacts of the contribution distribution between public and private sectors on project sustainability performance. A model named the sustainability performance-based evaluation model (SPbEM is developed for assisting the assessment of the level of sustainability performance of PPP projects. The study examines the possibility of achieving better sustainability through proper arrangement of the investment distribution between the two primary sectors in developing PPP-type infrastructure projects.

  16. Majandus soosib PPP projekte / Neil Tindal

    Index Scriptorium Estoniae

    Tindal, Neil

    2009-01-01

    Neil Tindal, kes on Suurbritannia nõustaja infrastruktuuri projektide ja avalike riigihangete alal, vastab küsimustele, mis puudutavad finantskriisi mõju Euroopa kiirrongide PPP projektide realiseerimisele ning riikliku investeerimise suurenemist PPP projektidesse

  17. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    Climatiques en Zone Soudano-Sahélienne : Cas De Mogode, Extrême-Nord. Cameroun. DJAKOU ... climatique majeurs affectant l'eau dans la zone d'étude. Les inondations détruisent les .... zone soudano-sahélienne. L'objectif global est de.

  18. Glyphosate-induced oxidative stress in Arabidopsis thaliana affecting peroxisomal metabolism and triggers activity in the oxidative phase of the pentose phosphate pathway (OxPPP) involved in NADPH generation.

    Science.gov (United States)

    de Freitas-Silva, Larisse; Rodríguez-Ruiz, Marta; Houmani, Hayet; da Silva, Luzimar Campos; Palma, José M; Corpas, Francisco J

    2017-11-01

    Glyphosate is a broad-spectrum systemic herbicide used worldwide. In susceptible plants, glyphosate affects the shikimate pathway and reduces aromatic amino acid synthesis. Using Arabidopsis seedlings grown in the presence of 20μM glyphosate, we analyzed H 2 O 2 , ascorbate, glutathione (GSH) and protein oxidation content as well as antioxidant catalase, superoxide dismutase (SOD) and ascorbate-glutathione cycle enzyme activity. We also examined the principal NADPH-generating system components, including glucose-6-phosphate dehydrogenase (G6PDH), 6-phosphogluconate dehydrogenase (6PGDH), NADP-malic enzyme (NADP-ME) and NADP-isocitrate dehydrogenase (NADP-ICDH). Glyphosate caused a drastic reduction in growth parameters and an increase in protein oxidation. The herbicide also resulted in an overall increase in GSH content, antioxidant enzyme activity (catalase and all enzymatic components of the ascorbate-glutathione cycle) in addition to the two oxidative phase enzymes, G6PDH and 6PGDH, in the pentose phosphate pathway involved in NADPH generation. In this study, we provide new evidence on the participation of G6PDH and 6PGDH in the response to oxidative stress induced by glyphosate in Arabidopsis, in which peroxisomal enzymes, such as catalase and glycolate oxidase, are positively affected. We suggest that the NADPH provided by the oxidative phase of the pentose phosphate pathway (OxPPP) should serve to maintain glutathione reductase (GR) activity, thus preserving and regenerating the intracellular GSH pool under glyphosate-induced stress. It is particularly remarkable that the 6PGDH activity was unaffected by pro-oxidant and nitrating molecules such as H 2 0 2 , nitric oxide or peroxynitrite. Copyright © 2017 Elsevier GmbH. All rights reserved.

  19. 40 CFR 60.2989 - Does this subpart directly affect incineration unit owners and operators in my State?

    Science.gov (United States)

    2010-07-01

    ... incineration unit owners and operators in my State? 60.2989 Section 60.2989 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... incineration unit owners and operators in my State? (a) No, this subpart does not directly affect incineration...

  20. A new PPP algorithm for deformation monitoring with single ...

    Indian Academy of Sciences (India)

    However, the existing SF PPP methods can be hardly implemented for deformation monitoring directly due to their limited ... solutions for various applications, such as survey- ..... SEID model, traditional DF PPP and the new PPP algorithm with ...

  1. 40 CFR Table 9 to Subpart Xxxx of... - Minimum Data for Continuous Compliance With the Emission Limits for Tire Production Affected Sources

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Minimum Data for Continuous Compliance With the Emission Limits for Tire Production Affected Sources 9 Table 9 to Subpart XXXX of Part 63... Hazardous Air Pollutants: Rubber Tire Manufacturing Pt. 63, Subpt. XXXX, Table 9 Table 9 to Subpart XXXX of...

  2. 40 CFR Table 11 to Subpart Xxxx of... - Minimum Data for Continuous Compliance With the Emission Limits for Tire Cord Production Affected...

    Science.gov (United States)

    2010-07-01

    ... With the Emission Limits for Tire Cord Production Affected Sources 11 Table 11 to Subpart XXXX of Part... for Hazardous Air Pollutants: Rubber Tire Manufacturing Pt. 63, Subpt. XXXX, Table 11 Table 11 to Subpart XXXX of Part 63—Minimum Data for Continuous Compliance With the Emission Limits for Tire Cord...

  3. 40 CFR Table 3 to Subpart Dd of... - Tank Control Levels for Tanks at Existing Affected Sources as Required by 40 CFR 63.685(b)(1)

    Science.gov (United States)

    2010-07-01

    ... Existing Affected Sources as Required by 40 CFR 63.685(b)(1) 3 Table 3 to Subpart DD of Part 63 Protection... Hazardous Air Pollutants from Off-Site Waste and Recovery Operations Pt. 63, Subpt. DD, Table 3 Table 3 to Subpart DD of Part 63—Tank Control Levels for Tanks at Existing Affected Sources as Required by 40 CFR 63...

  4. 40 CFR Table 4 to Subpart Dd of... - Tank Control Levels for Tanks at New Affected Sources as Required by 40 CFR 63.685(b)(2)

    Science.gov (United States)

    2010-07-01

    ... Affected Sources as Required by 40 CFR 63.685(b)(2) 4 Table 4 to Subpart DD of Part 63 Protection of... Hazardous Air Pollutants from Off-Site Waste and Recovery Operations Pt. 63, Subpt. DD, Table 4 Table 4 to Subpart DD of Part 63—Tank Control Levels for Tanks at New Affected Sources as Required by 40 CFR 63.685(b...

  5. PPP-Projekte bei Regionalen Sozial-Wirtschaftlichen Entwicklung. PPP projektid regionaalses sotsiaalmajanduslikus arengus

    Directory of Open Access Journals (Sweden)

    Sulev Mäeltsemees

    2013-01-01

    Full Text Available The purpose of this paper is to analyze the legal and economical problems of the PPP-projects (mainly in Tallinn and the comparative analysis of the PPP-projects in some EU countries. Unfortunately the PPP-projects in Estonia is such a new topic that there have been no scientifically qualifiying publications written about it. Quite many topic-related articles have been published in journalism but the purpose of them has been mainly political. In Estonia (mainly in Tallinn the PPP-projects have been exercised since year 2000. Since then the PPP-projects have been debated over by the state (Ministry of Finance and the City of Tallinn about whether the PPPprojects should be counted into the debt obligations of the city or not? According to the Rural Municipality and City Budget Act a rural municipality or city may take loans, on the following conditions, the total amount of unrepaid loans shall not exceed 60 percent 20 per cent of proposed budget revenue for that budgetary year. Until 2008 Tallinn counted the costs of the PPP-projects only as yearly payments to the private sector but not as a loan. Since 2009 the new bookkeeping rules were enacted and the PPP-projects were counted upon the local government dept obligations. Thereat it is relevant to mention that the methodics of the Eurostat don`t calculate PPP-projects as dept obligations of the public sector. Until now the PPPprojects in Estonia have been exercised only for some years and it has been done only for renovation of the social infrastructure objects (schools or construction (dwelling houses, sport structures. Although the PPP-projects have been planned to be used in development of the technical infrastructures (roads these plans haven`t been accomplished yet. PPP-projects have been Tallinn-centered and the reason for this is that Tallinn has compared to other cities a lot more potential to administer and finance the complicated projects. More extensive use of the PPP-projects has been

  6. Consideration of Risk in PPP-Projects

    Directory of Open Access Journals (Sweden)

    Josef Zimmermann

    2014-06-01

    Full Text Available Risk management has become a core competence for companies operating in construction services. In particular regarding Real Estate Development and Construction Management the fundamental knowledge and the dedicated ap- plication of risk assessment turn out to be critical. Construction Management deals with a multitude of local and temporal issues which are unknown or only given by statistical evaluation while conducting a unique construction project within a very tight frame of budget and time. Real Estate projects focus on the predictability of profitable operation for a fairly long period in advance and are therefore subject to many more and more voluminous uncertainties. With PPP-projects a more or less complete federal task is awarded to a private company. Its extent varies but com- prises at least design, construction and operation of a real estate project, e.g. a toll road, bridge, tunnel or other infrastructural object. Durations of such contracts of- ten extend to some 20 to 30 years. In this article the applicability of traditional means of risk management is inves- tigated for the use on PPP-projects and limits of risk consequences are pointed out. Finally we come to the conclusion, that the resulting unavertable risks tend to exceed every surcharge that could be successfully placed on a market.

  7. A simple test for PPP among traded goods

    NARCIS (Netherlands)

    Ph.H.B.F. Franses (Philip Hans); D.J.C. van Dijk (Dick)

    2002-01-01

    textabstractThe so-called Balassa-Samuelson model implies that relative prices of non-traded goods may be nonstationary and, hence, that PPP should preferably be tested on real exchange rates based on prices of traded goods only. We propose a simple test for PPP among traded goods which can be

  8. Ten Lessons from Ten Years PPP Experience in Belgium

    NARCIS (Netherlands)

    Willems, T.; Verhoest, K.; Voets, J.; Coppens, T.; van Dooren, W.; van den Hurk, M.

    2017-01-01

    In 2004 Flanders, the northern region of Belgium launched a range of large public–private partnership (PPP) projects for a total value of 6 billion euros. Ten years later, PPP has become a well-embedded procurement method for long-term public infrastructure projects. This article makes a critical

  9. Analysis and Countermeasures of PPP Project Implementation Difficulties

    Directory of Open Access Journals (Sweden)

    Xu Yifeng

    2017-01-01

    Full Text Available Since the beginning of 1995, the model of PPP project construction was introduced in China. It has been widely used in many fields such as energy, municipal, and so on. It has accumulated a lot of experience in improving the investment system structure and guiding the social capital into the infrastructure field. But the mode of PPP project construction in the implementing process in different environment often encounters a lot of problems. Based on a large amount of analysis on the existing literature, this paper resorts out the PPP project model combining the problems occurred in the implementation process of PPP project, and summarizes corresponding countermeasures aiming at the problems in order to provide help for PPP project implementation in the future.

  10. Analysing the Zenith Tropospheric Delay Estimates in On-line Precise Point Positioning (PPP) Services and PPP Software Packages.

    Science.gov (United States)

    Mendez Astudillo, Jorge; Lau, Lawrence; Tang, Yu-Ting; Moore, Terry

    2018-02-14

    As Global Navigation Satellite System (GNSS) signals travel through the troposphere, a tropospheric delay occurs due to a change in the refractive index of the medium. The Precise Point Positioning (PPP) technique can achieve centimeter/millimeter positioning accuracy with only one GNSS receiver. The Zenith Tropospheric Delay (ZTD) is estimated alongside with the position unknowns in PPP. Estimated ZTD can be very useful for meteorological applications, an example is the estimation of water vapor content in the atmosphere from the estimated ZTD. PPP is implemented with different algorithms and models in online services and software packages. In this study, a performance assessment with analysis of ZTD estimates from three PPP online services and three software packages is presented. The main contribution of this paper is to show the accuracy of ZTD estimation achievable in PPP. The analysis also provides the GNSS users and researchers the insight of the processing algorithm dependence and impact on PPP ZTD estimation. Observation data of eight whole days from a total of nine International GNSS Service (IGS) tracking stations spread in the northern hemisphere, the equatorial region and the southern hemisphere is used in this analysis. The PPP ZTD estimates are compared with the ZTD obtained from the IGS tropospheric product of the same days. The estimates of two of the three online PPP services show good agreement (<1 cm) with the IGS ZTD values at the northern and southern hemisphere stations. The results also show that the online PPP services perform better than the selected PPP software packages at all stations.

  11. Analysing the Zenith Tropospheric Delay Estimates in On-line Precise Point Positioning (PPP Services and PPP Software Packages

    Directory of Open Access Journals (Sweden)

    Jorge Mendez Astudillo

    2018-02-01

    Full Text Available As Global Navigation Satellite System (GNSS signals travel through the troposphere, a tropospheric delay occurs due to a change in the refractive index of the medium. The Precise Point Positioning (PPP technique can achieve centimeter/millimeter positioning accuracy with only one GNSS receiver. The Zenith Tropospheric Delay (ZTD is estimated alongside with the position unknowns in PPP. Estimated ZTD can be very useful for meteorological applications, an example is the estimation of water vapor content in the atmosphere from the estimated ZTD. PPP is implemented with different algorithms and models in online services and software packages. In this study, a performance assessment with analysis of ZTD estimates from three PPP online services and three software packages is presented. The main contribution of this paper is to show the accuracy of ZTD estimation achievable in PPP. The analysis also provides the GNSS users and researchers the insight of the processing algorithm dependence and impact on PPP ZTD estimation. Observation data of eight whole days from a total of nine International GNSS Service (IGS tracking stations spread in the northern hemisphere, the equatorial region and the southern hemisphere is used in this analysis. The PPP ZTD estimates are compared with the ZTD obtained from the IGS tropospheric product of the same days. The estimates of two of the three online PPP services show good agreement (<1 cm with the IGS ZTD values at the northern and southern hemisphere stations. The results also show that the online PPP services perform better than the selected PPP software packages at all stations.

  12. Reexamination of the Purchasing Power Parity (PPP) under Cournot Competition

    OpenAIRE

    Dai, Meixing

    1995-01-01

    This paper reexamines the Purchasing Power Parity (PPP) in an open economy macroeconomic model with Cournot competition in the international trade of a unique good. Foreign and domestic firms have a Cournot perception of foreign and domestic markets and make separate quantity decisions for each market taking the quantity decisions of the other firm as given. In introducing the money, the balance of payments relation and the nominal exchange rate, the PPP implied by the law of one price can be...

  13. PPP - Efficiency, Fairness and Quality in Water Management

    DEFF Research Database (Denmark)

    Pedersen, Jørgen Lindgaard; Zhan, Weidong

    2009-01-01

    competiveness between PPP and pure public water management. The paper will focus on cases from China with the first from mid - 1990s.There is only one case which can be characterised as a full success (innovation, productivity, cost and quality). In other cases there are successes in some dimensions...... but failures in other. The conclusion is that we can't say that the PPP in Chinese water and sanitation are sustainable....

  14. The PPP Precision Analysis Based on BDS Regional Navigation System

    Directory of Open Access Journals (Sweden)

    ZHU Yongxing

    2015-04-01

    Full Text Available BeiDou navigation satellite system(BDS has opened service in most of the Asia-Pacific region, it offers the possibility to break the technological monopoly of GPS in the field of high-precision applications, so its performance of precise point positioning (PPP has been a great concern. Firstly, the constellation of BeiDou regional navigation system and BDS/GPS tracking network is introduced. Secondly, the precise ephemeris and clock offset accuracy of BeiDou satellite based on domestic tracking network is analyzed. Finally, the static and kinematic PPP accuracy is studied, and compared with the GPS. The actual measured numerical example shows that the static and kinematic PPP based on BDS can achieve centimeter-level and decimeter-level respectively, reaching the current level of GPS precise point positioning.

  15. International asset pricing under segmentation and PPP deviations

    NARCIS (Netherlands)

    Chaieb, I.; Errunza, V.

    2007-01-01

    We analyze the impact of both purchasing power parity (PPP) deviations and market segmentation on asset pricing and investor's portfolio holdings. The freely traded securities command a world market risk premium and an inflation risk premium. The securities that can be held by only a subset of

  16. PPP Sliding Window Algorithm and Its Application in Deformation Monitoring

    Science.gov (United States)

    Song, Weiwei; Zhang, Rui; Yao, Yibin; Liu, Yanyan; Hu, Yuming

    2016-01-01

    Compared with the double-difference relative positioning method, the precise point positioning (PPP) algorithm can avoid the selection of a static reference station and directly measure the three-dimensional position changes at the observation site and exhibit superiority in a variety of deformation monitoring applications. However, because of the influence of various observing errors, the accuracy of PPP is generally at the cm-dm level, which cannot meet the requirements needed for high precision deformation monitoring. For most of the monitoring applications, the observation stations maintain stationary, which can be provided as a priori constraint information. In this paper, a new PPP algorithm based on a sliding window was proposed to improve the positioning accuracy. Firstly, data from IGS tracking station was processed using both traditional and new PPP algorithm; the results showed that the new algorithm can effectively improve positioning accuracy, especially for the elevation direction. Then, an earthquake simulation platform was used to simulate an earthquake event; the results illustrated that the new algorithm can effectively detect the vibrations change of a reference station during an earthquake. At last, the observed Wenchuan earthquake experimental results showed that the new algorithm was feasible to monitor the real earthquakes and provide early-warning alerts. PMID:27241172

  17. Valitsus tõmbab PPP-skeemidele pidurit? / Raimo Poom

    Index Scriptorium Estoniae

    Poom, Raimo

    2011-01-01

    Nii rahandusministeerium kui ka Reformierakond kahtlevad, kas Kose-Mäo teelõigu neljarealiseks ehitamisel ja Jägala sõjaväelinnaku ehitamisel oleks mõistlik kasutada PPP-skeemi. Kaitseminister Mart Laar on Jägala sõjaväelinnaku rajamise ettepaneku tagasi võtnud

  18. PPP projects in transport and telecommunications in Poland and Slovakia

    Directory of Open Access Journals (Sweden)

    Anna TOMOVÁ

    2008-01-01

    Full Text Available The paper informs about public – private partnerships projects in transport and telecommunications in Poland and Slovakia, describing various modes of capital entry. The PPI database of the World Bank is used. Advantages of PPP schemes are discussed for further development of infrastructure sectors.

  19. Genetics Home Reference: PPP2R5D-related intellectual disability

    Science.gov (United States)

    ... Health Conditions PPP2R5D-related intellectual disability PPP2R5D-related intellectual disability Printable PDF Open All Close All Enable Javascript ... view the expand/collapse boxes. Description PPP2R5D -related intellectual disability is a neurological disorder characterized by moderate to ...

  20. Determination of Uncalibrated Phase Delays for Real-Time PPP

    Science.gov (United States)

    Hinterberger, Fabian; Weber, Robert; Huber, Katrin; Lesjak, Roman

    2014-05-01

    Today PPP is a well-known technique of GNSS based positioning used for a wide range of post-processing applications. Using observations of a single GNSS receiver and applying precise orbit and clock information derived from global GNSS networks highly precise positions can be obtained. The atmospheric delays are usually mitigated by linear combination (ionosphere) and parameter estimation (troposphere). Within the last years also the demand for real-time PPP increased. In 2012, the IGS real-time working group started a pilot project to broadcast real-time precise orbits and clock correction streams. Nevertheless, real-time PPP is in its starting phase and currently only few applications make use of the technique although SSR-Messages are already implemented in RTCM3.1. The problems of still limited accuracy compared to Network-RTK as well as long convergence times might be solved by almost instantaneous integer ambiguity resolution at zero-difference level which is a major topic of current scientific investigations. Therefore a national consortium has carried out over the past 2 years the research project PPP-Serve (funded by the Austrian Research Promotion Agency - FFG), which aimed at the development of appropriate algorithms for real-time PPP with special emphasis on the ambiguity resolution of zero-difference observations. We have established a module which calculates based on GPS-reference station data-streams of a dense network (obtained from IGS via BKG) so-called wide-lane and narrow-lane satellite specific calibration phase delays. While the wide-lane phase delays are almost stable over longer periods, the estimation of narrow-lane phase delays has to be re-established every 24 hours. These phase-delays are submitted via a real-time module to the rover where they are used for point positioning via a PPP-model. This presentation deals with the process and obstacles of calculating the wide-lane and narrow-lane phase-delays (based on SD -observations between

  1. Temperature Measurement and Damage Detection in Concrete Beams Exposed to Fire Using PPP-BOTDA Based Fiber Optic Sensors.

    Science.gov (United States)

    Bao, Yi; Hoehler, Matthew S; Smith, Christopher M; Bundy, Matthew; Chen, Genda

    2017-10-01

    In this study, distributed fiber optic sensors based on pulse pre-pump Brillouin optical time domain analysis (PPP-BODTA) are characterized and deployed to measure spatially-distributed temperatures in reinforced concrete specimens exposed to fire. Four beams were tested to failure in a natural gas fueled compartment fire, each instrumented with one fused silica, single-mode optical fiber as a distributed sensor and four thermocouples. Prior to concrete cracking, the distributed temperature was validated at locations of the thermocouples by a relative difference of less than 9 %. The cracks in concrete can be identified as sharp peaks in the temperature distribution since the cracks are locally filled with hot air. Concrete cracking did not affect the sensitivity of the distributed sensor but concrete spalling broke the optical fiber loop required for PPP-BOTDA measurements.

  2. PPP-PROJECTS INFRASTRUCTURE AND SPECIFICS OF THEIR FINANCING

    OpenAIRE

    Dzambolat Valerevich Mrikaev

    2014-01-01

    The article examines the financing of public–private partnership (PPP) infrastructure programs in Russia and analyzes the role of financial credit systems. The object of the study becomes more relevant then ever as the demand in programs support by the government is growing as well as the need in creating an extra initiative for raising an external investment.The study observes the most essential program financing features in Russia, the aims and interests of the partners.Objective: to compar...

  3. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model

    Directory of Open Access Journals (Sweden)

    Lei Shi

    2018-01-01

    Full Text Available This study analyses the contractual efficiency of public-private partnership (PPP infrastructure projects, with a focus on two financial aspects: the nonrecourse principal and incompleteness of debt contracts. The nonrecourse principal releases the sponsoring companies from the debt contract when the special purpose vehicle (SPV established by the sponsoring companies falls into default. Consequently, all obligations under the debt contract are limited to the liability of the SPV following its default. Because the debt contract is incomplete, a renegotiation of an additional loan between the bank and the SPV might occur to enable project continuation or liquidation, which in turn influences the SPV’s ex ante strategies (moral hazard. Considering these two financial features of PPP infrastructure projects, this study develops an incomplete contract model to investigate how the renegotiation triggers ex ante moral hazard and ex post inefficient liquidation. We derive equilibrium strategies under service fees endogenously determined via bidding and examine the effect of equilibrium strategies on contractual efficiency. Finally, we propose an optimal combination of a performance guarantee, the government’s termination right, and a service fee to improve the contractual efficiency of PPP infrastructure projects.

  4. Public Private Partnership (PPP) jako možnost financování dopravní infrastruktury

    OpenAIRE

    TUČKOVÁ, Kristýna

    2012-01-01

    The aim of this bachelors work is the analysis of Public Private Partnership (PPP) and the financing of transport infrastructure. A partial aim is the definition of a PPP project, determining areas of operation and performace of participants in these projects. In addition closer financing PPP projects. The practical part indicate PPP project of highway D3 and expressway R3, comparing the advantages and disadvantages of a PPP project and the normal public order.

  5. Accuracy Investigation of PPP Method Versus Relative Positioning Using Different Satellite Ephemerides Products Near/Under Forest Environment

    Directory of Open Access Journals (Sweden)

    Taylan Ocalan

    2016-10-01

    Full Text Available In recent years, due to the increase in providers of orbit and clock corrections of satellites for data evaluation in real-time and post-processing the method of Precise Point Positioning (PPP using measurements of Global Navigation Satellite System (GNSS and Web-based online positioning services have become widespread. Owing to some advantages, such as work-duration and cost-effectiveness, many of users have implemented PPP method instead of the traditional relative positioning method for several applications. On GNSS applications the quality of satellite ephemerides products used for data evaluation is a significant factor that affects the results in post-processing solutions either applying relative or PPP methods on analyses. These products, classified as ultra-rapid, rapid and final orbits, are regularly provided by several national and international organizations to the users. In this paper, the accuracy of PPP method has been studied comparing the outcomes from various online Web services using different software and satellite ephemerides products. For this purpose, three test points were established in a place with completely free satellite visibility (AC01 and on the other two places with partially (YC01 and vastly (KC01 prevention of satellite signals near and within a forest area at Campus of Davutpaşa of the Yildiz Technical University in Istanbul. At these stations, static observations have been conducted with a time span of 6 hours on 4th May 2015. The dataset collected using Topcon HiperPro receiver, a receiver for GPS and GLONASS data, was evaluated manually by means of the Bernese v5.2 (BSW and GIPSY-OASIS v6.3 (Gipsy scientific software. Moreover, the GNSS data were also proceeded using six different Web-based online services (AUSPOS, OPUS, CSRS-PPP, APPS, GAPS, Trimble-RTX with ultra-rapid, rapid and final satellite ephemerides products. For the station with free satellite visibility (AC01, the analyses of outcomes indicate a

  6. Is the PPP valid for the EA-11 countries? New evidence from nonlinear unit root tests

    OpenAIRE

    Kavkler, Alenka; Boršič, Darja; Bekő, Jani

    2016-01-01

    In the empirical literature there is a prevalent view that real exchange rates tend to converge towards levels predicted by the Purchasing Power Parity (PPP) only in the long-run and that short-run deviations from the PPP relationship are frequently sizable. The progressing of European monetary integration and the forming of monetary union spurred the interest of researchers to assess the relevance of the PPP theory in the case of the single European currency. Our paper t...

  7. Two Directions of Public Private Partnership (PPP) Aplications in Local Administrations: Advantages and Disadvantages

    OpenAIRE

    UYSAL, Yusuf

    2017-01-01

    The Public Private Partnership (PPP) Model has been animportant alternative used by public authorities in the construction of infrastructurefacilities and public services after the 1990s. One of the most importantadvantages of the PPP is the solution to the problem of financing in publicservices. Another important advantage is that public services can be providedby private sector experience and methods. These and other advantages havegradually increased the preference rates of the PPP. Today,...

  8. Does PPP hold for Big Mac price or consumer price index? Evidence from panel cointegration

    OpenAIRE

    Chien-Fu Chen; Chung-Hua Shen; Chien-An Wang

    2007-01-01

    This paper examines the validity of purchasing power parity (PPP) using CPI and Big Mac prices. The benchmark model, i.e., the OLS method, which does not take nonstationarity into account, rejects the hypothesis of PPP regardless of prices used. We next use the panel cointegration method to consider the nonstationary nature of variables. Estimated results for CPI are mixed. The PPP is rejected when the nominal exchange rate is employed as the dependent variable but is not rejected when the pr...

  9. POD and PPP with multi-frequency processing

    Science.gov (United States)

    Roldán, Pedro; Navarro, Pedro; Rodríguez, Daniel; Rodríguez, Irma

    2017-04-01

    Precise Orbit Determination (POD) and Precise Point Positioning (PPP) are methods for estimating the orbits and clocks of GNSS satellites and the precise positions and clocks of user receivers. These methods are traditionally based on processing the ionosphere-free combination. With this combination, the delay introduced in the signal when passing through the ionosphere is removed, taking advantage of the dependency of this delay with the square of the frequency. It is also possible to process the individual frequencies, but in this case it is needed to properly model the ionospheric delay. This modelling is usually very challenging, as the electron content in the ionosphere experiences important temporal and spatial variations. These two options define the two main kinds of processing: the dual-frequency ionosphere-free processing, typically used in the POD and in certain applications of PPP, and the single-frequency processing with estimation or modelisation of the ionosphere, mostly used in the PPP processing. In magicGNSS, a software tool developed by GMV for POD and PPP, a hybrid approach has been implemented. This approach combines observations from any number of individual frequencies and any number of ionosphere-free combinations of these frequencies. In such a way, the observations of ionosphere-free combination allow a better estimation of positions and orbits, while the inclusion of observations from individual frequencies allows to estimate the ionospheric delay and to reduce the noise of the solution. It is also possible to include other kind of combinations, such as geometry-free combination, instead of processing individual frequencies. The joint processing of all the frequencies for all the constellations requires both the estimation or modelisation of ionospheric delay and the estimation of inter-frequency biases. The ionospheric delay can be estimated from the single-frequency or dual-frequency geometry-free observations, but it is also possible

  10. Determining the Exchange Rate: Purchasing Power Parity – PPP

    Directory of Open Access Journals (Sweden)

    Bangun WIDOYOKO

    2018-05-01

    Full Text Available This study aimed to examine the effect of inflation on the issue of exchange rate determination of the forward exchange rate on the exchange rate of RMB (Renminbi to Rupiah. Inflation has been chosen as an independent variable because of its close relation to PPP (purchasing power parity theory. Analyses in this research have used logistic analysis with time series data. The data that has been used include exchange rate data with the period 2007-2017 with a sample size of 132 data. The results of this study have shown that inflation is effective in determining the exchange rate.

  11. Risk Assessment of Engineering Project Financing Based on PPP Model

    Directory of Open Access Journals (Sweden)

    Ma Qiuli

    2017-01-01

    Full Text Available At present, the project financing channel is single, and the urban facilities are in short supply, and the risk assessment and prevention mechanism of financing should be further improved to reduce the risk of project financing. In view of this, the fuzzy comprehensive evaluation model of project financing risk which combined the method of fuzzy comprehensive evaluation and analytic hierarchy process is established. The scientificalness and effectiveness of the model are verified by the example of the world port project in Luohe city, and it provides basis and reference for engineering project financing based on PPP mode.

  12. No Policy for Public Private Partnership? PPP, Collaboration and Institutions

    DEFF Research Database (Denmark)

    Tolstrup Christensen, Lene; Greve, Carsten

    The paper examines how the PPP‐policy has developed in a country with low PPP activity. The paper focuses on the following research questions: How does collaboration occur between the public and private sector in relation to the provision of transport infrastructure and public service? How does...... infrastructure projects and public service provision contracts in the transport sector within roads and busses, bridges and tunnels, rail, airports and aviation and harbors. The projects will be categorized in relation to organizational and financial models and it leads to a. discussion of types of policy...

  13. European financial support and succesful road PPP Projects

    Energy Technology Data Exchange (ETDEWEB)

    Garrido Maza, G.

    2016-07-01

    The EU has been promoting the use of PPPs in order to accelerate the development of the Trans-European Transport Network (TEN-T) for ensuring economic, social and territorial cohesion and increasing accessibility throughout the Union. To encourage the use of PPPs, the European Commission has put several financing mechanisms at the disposal of the Member States, including a series of innovative financial instruments developed along with the European Investment Bank. The Bank has in turn played a major role in the promotion and financing of PPPs across the EU. The paper undertakes a review of the main financial instruments developed by the EU that are available to PPPs so as to determinate to what extent the European financial support has been channelled to road projects under that scheme in Spain. On the basis of the results obtained, a multiple regression model has been developed to analyse whether the PPP projects which enjoyed the financial support of the European Union tend to be significantly more successful from an economic point of view. The paper concludes that there is a positive correlation between receiving European financial support and the success of the PPP road projects. (Author)

  14. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  15. Multi-GNSS PPP-RTK : From large- to Small-Scale networks

    NARCIS (Netherlands)

    Nadarajah, Nandakumaran; Khodabandeh, Amir; Wang, Kan; Choudhury, Mazher; Teunissen, P.J.G.

    2018-01-01

    Precise point positioning (PPP) and its integer ambiguity resolution-enabled variant, PPP-RTK (real-time kinematic), can benefit enormously from the integration of multiple global navigation satellite systems (GNSS). In such a multi-GNSS landscape, the positioning convergence time is expected to

  16. The Existence of Long-Run PPP: A Comparison between Developed and Developing Countries

    Directory of Open Access Journals (Sweden)

    Sulistiadi Dono Iskandar

    2016-08-01

    Full Text Available McNown & Wallace (1989 argued that PPP will tend to holds in less developed countries due to the domination of nominal factors in the economy. In this study we try to investigate the existence of long-run PPP in eight countries consisting four developed and developing countries. Here we show that there is a strong evidence that long-run PPP holds for Germany, United Kingdom, and Chile. Furthermore, the additional tests also show that symmetry and proportionality conditions seem to hold in the three economies. As for other five economies, long-run PPP seems to be absence. Although one step general Error Correction Model and Johansen-Juselius cointegration procedure generates conflicting result, the result of both technique do not show a tendency for PPP to hold in developing countries thus rejecting argument proposed by McNown and Wallace.

  17. Expression and distribution of PPP2R5C gene in leukemia

    Directory of Open Access Journals (Sweden)

    Li Bo

    2011-05-01

    Full Text Available Abstract Background Recently, we clarified at the molecular level novel chromosomal translocation t(14;14(q11;q32 in a case of Sézary syndrome, which caused a rearrangement from TRAJ7 to the PPP2R5C gene. PPP2R5C is one of the regulatory B subunits of protein phosphatase 2A (PP2A. It plays a crucial role in cell proliferation, differentiation, and transformation. To characterize the expression and distribution of five different transcript variants of the PPP2R5C gene in leukemia, we analyzed the expression level of PPP2R5C in peripheral blood mononuclear cells from 77 patients with de novo leukemia, 26 patients with leukemia in complete remission (CR, and 20 healthy individuals by real-time PCR and identified the different variants of PPP2R5C by RT-PCR. Findings Significantly higher expression of PPP2R5C was found in AML, CML, T-ALL, and B-CLL groups in comparison with healthy controls. High expression of PPP2R5C was detected in the B-ALL group; however, no significant difference was found compared with the healthy group. The expression level of PPP2R5C in the CML-CR group decreased significantly compared with that in the de novo CML group and was not significantly different from the level in the healthy group. By using different primer pairs that covered different exons, five transcript variants of PPP2R5C could be identified. All variants could be detected in healthy samples as well as in all the leukemia samples, and similar frequencies and distributions of PPP2R5C were indicated. Conclusions Overexpression of PPP2R5C in T-cell malignancy as well as in myeloid leukemia cells might relate to its proliferation and differentiation. Investigation of the effect of target inhibition of this gene might be beneficial to further characterization of molecular mechanisms and targeted therapy in leukemia.

  18. PPP a jeho využití v sektoru dopravy : teorie vs. praxe

    OpenAIRE

    Klaus, Marek

    2010-01-01

    The main goal of the thesis is to create Critical Success Factors (in other words factors, that are essential to achieve successful project) for the Public-Private Partnerships (PPP) projects in the sector of transport. For this purpose, the first part of the thesis is considering general theory, main characteristics, advantages and disadvantages of this alternative model of public infrastructure implementation. Following practical part is studying opportunities and risks of PPP project in th...

  19. Testing Black Market vs. Official PPP: A Pooled Mean Group Estimation Approach

    OpenAIRE

    Goswami, Gour Gobinda; Hossain, Mohammad Zariab

    2013-01-01

    Testing purchasing power parity (PPP) using black market exchange rate data has gained popularity in recent times. It is claimed that black market exchange rate data more often support the PPP than the official exchange rate data. In this study, to assess both the long run stability of exchange rate and the short run dynamics, we employ Pooled Mean Group (PMG) Estimation developed by Pesaran et al. (1999) on eight groups of countries based on different criteria. Using the famous Reinhart and ...

  20. The validity of PPP: evidence from Lagrange multiplier unit root tests for ASEAN countries

    OpenAIRE

    Alper ASLAN

    2010-01-01

    The univariate and panel Lagrange Multiplier (LM) unit root tests with one and two structural breaks proposed by Lee and Strazicich (2003, 2004) which are considerably more powerful than traditional tests are employed to investigate whether the purchasing power parity (PPP) theory holds true for ASEAN countries by using both black market and official exchange rates. We find strong evidence in favour of long-run PPP for six ASEAN countries namely, Indonesia, Malaysia, Myanmar, Philippines, Sin...

  1. PPP-PROJECTS INFRASTRUCTURE AND SPECIFICS OF THEIR FINANCING

    Directory of Open Access Journals (Sweden)

    Dzambolat Valerevich Mrikaev

    2014-07-01

    Full Text Available The article examines the financing of public–private partnership (PPP infrastructure programs in Russia and analyzes the role of financial credit systems. The object of the study becomes more relevant then ever as the demand in programs support by the government is growing as well as the need in creating an extra initiative for raising an external investment.The study observes the most essential program financing features in Russia, the aims and interests of the partners.Objective: to compare the program financial assurance and specific features of such a public-private partnership form as project financing.  Methodology: We used scientific methods: analysis and synthesis, comparison, generalization, systematic approach.Results: As such “project financing” term doesn't exist in current Russian legislation. However, it is widely spread as a form of financial assurance. As a rule this term is used when talking about the investments in general regardless to specific ways of their execution. Russian governmental financing system under current economical circumstances has it all to use advantages of project financing  and effectively contribute to its further development.DOI: http://dx.doi.org/10.12731/2218-7405-2014-4-4

  2. Allocation of control rights in the PPP Project: a cooperative game model

    Science.gov (United States)

    Zhang, Yunhua; Feng, Jingchun; Yang, Shengtao

    2017-06-01

    Reasonable allocation of control rights is the key to the success of Public-Private Partnership (PPP) projects. PPP are services or ventures which are financed and operated through cooperation between governmental and private sector actors and which involve reasonable control rights sharing between these two partners. After professional firm with capital and technology as a shareholder participating in PPP project firms, the PPP project is diversified in participants and input resources. Meanwhile the allocation of control rights of PPP project tends to be complicated. According to the diversification of participants and input resources of PPP projects, the key participants are divided into professional firms and pure investors. Based on the cost of repurchase of different input resources in markets, the cooperative game relationship between these two parties is analyzed, on the basis of which the allocation model of the cooperative game for control rights is constructed to ensure optimum allocation ration of control rights and verify the share of control rights in proportion to the cost of repurchase.

  3. Calibration of GLONASS Inter-Frequency Code Bias for PPP Ambiguity Resolution with Heterogeneous Rover Receivers

    Directory of Open Access Journals (Sweden)

    Yanyan Liu

    2018-03-01

    Full Text Available Integer ambiguity resolution (IAR is important for rapid initialization of precise point positioning (PPP. Whereas many studies have been limited to Global Positioning System (GPS alone, there is a strong need to add Globalnaya Navigatsionnaya Sputnikovaya Sistema (GLONASS to the PPP-IAR solution. However, the frequency-division multiplexing of GLONASS signals causes inter-frequency code bias (IFCB in the receiving equipment. The IFCB causes GLONASS wide-lane uncalibrated phase delay (UPD estimation with heterogeneous receiver types to fail, so GLONASS ambiguity is therefore traditionally estimated as float values in PPP. A two-step method of calibrating GLONASS IFCB is proposed in this paper, such that GLONASS PPP-IAR can be performed with heterogeneous receivers. Experimental results demonstrate that with the proposed method, GLONASS PPP ambiguity resolution can be achieved across a variety of receiver types. For kinematic PPP with mixed receiver types, the fixing percentage within 10 min is only 33.5% for GPS-only. Upon adding GLONASS, the percentage improves substantially, to 84.9%.

  4. Temperature measurement and damage detection in concrete beams exposed to fire using PPP-BOTDA based fiber optic sensors

    Science.gov (United States)

    Bao, Yi; Hoehler, Matthew S.; Smith, Christopher M.; Bundy, Matthew; Chen, Genda

    2017-10-01

    In this study, Brillouin scattering-based distributed fiber optic sensor is implemented to measure temperature distributions and detect cracks in concrete structures subjected to fire for the first time. A telecommunication-grade optical fiber is characterized as a high temperature sensor with pulse pre-pump Brillouin optical time domain analysis (PPP-BODTA), and implemented to measure spatially-distributed temperatures in reinforced concrete beams in fire. Four beams were tested to failure in a natural gas fueled compartment fire, each instrumented with one fused silica, single-mode optical fiber as a distributed sensor and four thermocouples. Prior to concrete cracking, the distributed temperature was validated at locations of the thermocouples by a relative difference of less than 9%. The cracks in concrete can be identified as sharp peaks in the temperature distribution since the cracks are locally filled with hot air. Concrete cracking did not affect the sensitivity of the distributed sensor but concrete spalling broke the optical fiber loop required for PPP-BOTDA measurements.

  5. Fast-PPP assessment in European and equatorial region near the solar cycle maximum

    Science.gov (United States)

    Rovira-Garcia, Adria; Juan, José Miguel; Sanz, Jaume

    2014-05-01

    The Fast Precise Point Positioning (Fast-PPP) is a technique to provide quick high-accuracy navigation with ambiguity fixing capability, thanks to an accurate modelling of the ionosphere. Indeed, once the availability of real-time precise satellite orbits and clocks is granted to users, the next challenge is the accuracy of real-time ionospheric corrections. Several steps had been taken by gAGE/UPC to develop such global system for precise navigation. First Wide-Area Real-Time Kinematics (WARTK) feasibility studies enabled precise relative continental navigation using a few tens of reference stations. Later multi-frequency and multi-constellation assessments in different ionospheric scenarios, including maximum solar-cycle conditions, were focussed on user-domain performance. Recently, a mature evolution of the technique consists on a dual service scheme; a global Precise Point Positioning (PPP) service, together with a continental enhancement to shorten convergence. A end to end performance assessment of the Fast-PPP technique is presented in this work, focussed in Europe and in the equatorial region of South East Asia (SEA), both near the solar cycle maximum. The accuracy of the Central Processing Facility (CPF) real-time precise satellite orbits and clocks is respectively, 4 centimetres and 0.2 nanoseconds, in line with the accuracy of the International GNSS Service (IGS) analysis centres. This global PPP service is enhanced by the Fast-PPP by adding the capability of global undifferenced ambiguity fixing thanks to the fractional part of the ambiguities determination. The core of the Fast-PPP is the capability to compute real-time ionospheric determinations with accuracies at the level or better than 1 Total Electron Content Unit (TECU), improving the widely-accepted Global Ionospheric Maps (GIM), with declared accuracies of 2-8 TECU. This large improvement in the modelling accuracy is achieved thanks to a two-layer description of the ionosphere combined with

  6. Assessment Study of Using Online (CSRS) GPS-PPP Service for Mapping Applications in Egypt

    Science.gov (United States)

    Abd-Elazeem, Mohamed; Farah, Ashraf; Farrag, Farrag

    2011-09-01

    Many applications in navigation, land surveying, land title definitions and mapping have been made simpler and more precise due to accessibility of Global Positioning System (GPS) data, and thus the demand for using advanced GPS techniques in surveying applications has become essential. The differential technique was the only source of accurate positioning for many years, and remained in use despite of its cost. The precise point positioning (PPP) technique is a viable alternative to the differential positioning method in which a user with a single receiver can attain positioning accuracy at the centimeter or decimeter scale. In recent years, many organizations introduced online (GPS-PPP) processing services capable of determining accurate geocentric positions using GPS observations. These services provide the user with receiver coordinates in free and unlimited access formats via the internet. This paper investigates the accuracy of the Canadian Spatial Reference System (CSRS) Precise Point Positioning (PPP) (CSRS-PPP) service supervised by the Geodetic Survey Division (GSD), Canada. Single frequency static GPS observations have been collected at three points covering time spans of 60, 90 and 120 minutes. These three observed sites form baselines of 1.6, 7, and 10 km, respectively. In order to assess the CSRS-PPP accuracy, the discrepancies between the CSRS-PPP estimates and the regular differential GPS solutions were computed. The obtained results illustrate that the PPP produces a horizontal error at the scale of a few decimeters; this is accurate enough to serve many mapping applications in developing countries with a savings in both cost and experienced labor.

  7. Affect

    NARCIS (Netherlands)

    Cetinic, M.; Diamanti, J.; Szeman, I.; Blacker, S.; Sully, J.

    2017-01-01

    This chapter historicizes four divergent but historically contemporaneous genres of affect theory – romantic, realist, speculative, and materialist. While critics credited with the turn to affect in the 1990s wrote largely in the wake of poststructuralism from the perspective of gender and queer

  8. Risk identification for PPP waste-to-energy incineration projects in China

    International Nuclear Information System (INIS)

    Song, Jinbo; Song, Danrong; Zhang, Xueqing; Sun, Yan

    2013-01-01

    Municipal solid waste (MSW) is regarded as a renewable energy source. In China, the sharp increase of MSW has precipitated the rapid growth of waste-to-energy (WTE) incineration plants. Private capital has been getting into the WTE incineration industry through the public–private partnership (PPP) arrangement. Due to the large construction cost and the long concession period commonly associated with this arrangement, a number of failures have emerged in PPP WTE incineration projects. The aim of this paper is to investigate the key risks of PPP WTE incineration projects in China and study the strategies for managing these risks by drawing experience and learning lessons from these projects. First, we analyzed the MSW management practices, relevant legislations and policies, and the development of PPP WTE incineration projects in China. Second, we identified ten key risks through interviews, surveys and visits to some selected projects, and provided detailed analysis of these risks. Lastly, we developed response strategies for these risks from the perspectives of both public and private sectors. - Highlights: • We analyze MSW management practices, relevant legislations and policies in China. • Through case study on PPP WTE incineration projects, ten key risks are identified. • Response strategies for key risks are developed

  9. Public-Private Partnerships (PPP on moulding state structures: The Non-Ergodic Africa

    Directory of Open Access Journals (Sweden)

    Fred Amonya

    2016-10-01

    Full Text Available Public-Private Partnerships (PPP is a ubiquitous reality. In Africa, the wave of PPP has hit states in their infancy – still moulding following only 50 years since independence. The common perspective of PPP on the realms of scholarship is transactional (focused on the delivery-end of infrastructure. This paper presents a deeper and broader perspective, and it is a distillate of a case study on PPP as a policy phenomenon. It dissects and illuminates the interaction between the forces of state formation and the wave of PPP hitting the continent. The lens of this case study is Institutional Rational Choice (IRC. The tools are a variety, comprising textual analysis, hermeneutics and econometrics – in keeping with the essence of case study (explication of reality in-situ. The product is not the orthodox generalization (claiming ‘the way’. Instead, the explication offers a viewpoint (and trigger questions on public space of Africa, while underpinning the non-ergodic character of that space

  10. Review of issues and challenges for public private partnership (PPP) project performance in Malaysia

    Science.gov (United States)

    Hashim, H.; Che-Ani, A. I.; Ismail, K.

    2017-10-01

    Public Private Partnership (PPP) in Malaysia aims to stimulate economic growth and overcome the weakness of conventional system. Over the years, many critics have been reported along the massive growth of PPP project development. Within that context, this study provides a review of issues and challenges for PPP pertaining to project performance in Malaysia. The study also attempts to investigate four performance measurement models around the globe as a basis for improvement of PPP in Malaysia. A qualitative method was used to analyse literature review from previous published literatures while comparative analysis was carried out within the models to identify their advantages and disadvantages. The findings show that the issues and challenges occurred were related to human, technical and financial factor that could hinder the implementation of PPP project in Malaysia. From the analysis, KPIs, guideline / framework, risk allocation, efficiency & flexibility are perceived as dominant issues. Finally, the findings provide an informed basis on the opportunity areas to be considered for improvement in order to achieved project effectiveness.

  11. Risk management of PPP project in the preparation stage based on Fault Tree Analysis

    Science.gov (United States)

    Xing, Yuanzhi; Guan, Qiuling

    2017-03-01

    The risk management of PPP(Public Private Partnership) project can improve the level of risk control between government departments and private investors, so as to make more beneficial decisions, reduce investment losses and achieve mutual benefit as well. Therefore, this paper takes the PPP project preparation stage venture as the research object to identify and confirm four types of risks. At the same time, fault tree analysis(FTA) is used to evaluate the risk factors that belong to different parts, and quantify the influencing degree of risk impact on the basis of risk identification. In addition, it determines the importance order of risk factors by calculating unit structure importance on PPP project preparation stage. The result shows that accuracy of government decision-making, rationality of private investors funds allocation and instability of market returns are the main factors to generate the shared risk on the project.

  12. PPP as a modern concept for providing public goods and services and its application in Serbia

    Directory of Open Access Journals (Sweden)

    Drljača-Kanazir Svetlana

    2015-01-01

    Full Text Available Public-private partnership (hereinafter: PPP is an unconventional and modern pattern used to finance the construction and exploitation of public goods, which introduces the market based principles of operation in the public sector in the leading word economies as a result of market deregulation and liberalization. The purpose of this paper is to present the basic PPP characteristics, models of funding, and to highlight that this concept of financing the public goods and services is not sufficiently used in Serbia despite the fact that the necessary legal framework and educated staff in the public private and financial sectors, and active promotion of the concept as such are in place. This paper is intended to point that PPP is the only sustainable model of public infrastructure development (roads, tunnels, bridges, power generation plants, etc. in Serbia which is struggling with the significant budget deficit, huge public debt, high unemployment rate and a stagnating economy.

  13. A Comparative Study of Precise Point Positioning (PPP Accuracy Using Online Services

    Directory of Open Access Journals (Sweden)

    Malinowski Marcin

    2016-12-01

    Full Text Available Precise Point Positioning (PPP is a technique used to determine the position of receiver antenna without communication with the reference station. It may be an alternative solution to differential measurements, where maintaining a connection with a single RTK station or a regional network of reference stations RTN is necessary. This situation is especially common in areas with poorly developed infrastructure of ground stations. A lot of research conducted so far on the use of the PPP technique has been concerned about the development of entire day observation sessions. However, this paper presents the results of a comparative analysis of accuracy of absolute determination of position from observations which last between 1 to 7 hours with the use of four permanent services which execute calculations with PPP technique such as: Automatic Precise Positioning Service (APPS, Canadian Spatial Reference System Precise Point Positioning (CSRS-PPP, GNSS Analysis and Positioning Software (GAPS and magicPPP - Precise Point Positioning Solution (magicGNSS. On the basis of acquired results of measurements, it can be concluded that at least two-hour long measurements allow acquiring an absolute position with an accuracy of 2-4 cm. An evaluation of the impact on the accuracy of simultaneous positioning of three points test network on the change of the horizontal distance and the relative height difference between measured triangle vertices was also conducted. Distances and relative height differences between points of the triangular test network measured with a laser station Leica TDRA6000 were adopted as references. The analyses of results show that at least two hours long measurement sessions can be used to determine the horizontal distance or the difference in height with an accuracy of 1-2 cm. Rapid products employed in calculations conducted with PPP technique reached the accuracy of determining coordinates on a close level as in elaborations which employ

  14. Kinematic-PPP using Single/Dual Frequency Observations from (GPS, GLONASS and GPS/GLONASS) Constellations for Hydrography

    Science.gov (United States)

    Farah, Ashraf

    2018-03-01

    Global Positioning System (GPS) technology is ideally suited for inshore and offshore positioning because of its high accuracy and the short observation time required for a position fix. Precise point positioning (PPP) is a technique used for position computation with a high accuracy using a single GNSS receiver. It relies on highly accurate satellite position and clock data that can be acquired from different sources such as the International GNSS Service (IGS). PPP precision varies based on positioning technique (static or kinematic), observations type (single or dual frequency) and the duration of observations among other factors. PPP offers comparable accuracy to differential GPS with safe in cost and time. For many years, PPP users depended on GPS (American system) which considered the solely reliable system. GLONASS's contribution in PPP techniques was limited due to fail in maintaining full constellation. Yet, GLONASS limited observations could be integrated into GPS-based PPP to improve availability and precision. As GLONASS reached its full constellation early 2013, there is a wide interest in PPP systems based on GLONASS only and independent of GPS. This paper investigates the performance of kinematic PPP solution for the hydrographic applications in the Nile river (Aswan, Egypt) based on GPS, GLONASS and GPS/GLONASS constellations. The study investigates also the effect of using two different observation types; single-frequency and dual frequency observations from the tested constellations.

  15. Steady γ-Ray Effects on the Performance of PPP-BOTDA and TW-COTDR Fiber Sensing

    Directory of Open Access Journals (Sweden)

    Isabelle Planes

    2017-02-01

    Full Text Available We investigated the evolution of the performances of Pulse Pre Pump-Brillouin Time Domain Analysis (PPP-BOTDA and Tunable Wavelength Coherent Optical Time Domain Reflectometry (TW-COTDR fiber-based temperature and strain sensors when the sensing optical fiber is exposed to two γ-ray irradiation conditions: (i at room temperature and a dose rate of 370 Gy(SiO2/h up to a total ionizing dose (TID of 56 kGy; (ii at room temperature and a dose rate of 25 kGy(SiO2/h up to a TID of 10 MGy. Two main different classes of single-mode optical fibers have been tested in situ, radiation-tolerant ones: fluorine-doped or nitrogen-doped core fibers, as well as Telecom-grade germanosilicate ones. Brillouin and Rayleigh Sensitivities of N-Doped fibers were not reported yet, and these characterizations pave the way for a novel and alternative sensing scheme. Moreover, in these harsh conditions, our results showed that the main parameter affecting the sensor sensitivity remains the Radiation Induced Attenuation (RIA at its operation wavelength of 1550 nm. RIA limits the maximal sensing range but does not influence the measurement uncertainty. F-doped fiber is the most tolerant against RIA with induced losses below 8 dB/km after a 56 kGy accumulated dose whereas the excess losses of other fibers exceed 22 dB/km. Both Rayleigh and Brillouin signatures that are exploited by the PPP-BOTDA and the TW-COTDR remain unchanged (within our experimental uncertainties. The strain and temperature coefficients of the various fibers under test are not modified by radiations, at these dose/dose rate levels. Consequently, this enables the design of a robust strain and temperature sensing architecture for the monitoring of radioactive waste disposals.

  16. Public Private Partnership a PPP projekt Výstavba a provoz věznice typu s ostrahou

    OpenAIRE

    Císařová, Markéta

    2009-01-01

    This Bachelor Thesis deals with Public Private Partnership. In the first part there is a PPP definition, there are specified basic characteristic features of this partnership and sumed up basic historical findings about PPP. The Thesis concentrates on advantages and disadvantages, resulting from this partnership, on definition of basic types of PPP projects and their sector division. The second part of the Thesis is focused on particular PPP project Buildind-up and Operating of Prison with Hi...

  17. 40 CFR Table 1 to Subpart Oooo of... - Emission Limits for New or Reconstructed and Existing Affected Sources in the Printing, Coating...

    Science.gov (United States)

    2010-07-01

    ... Reconstructed and Existing Affected Sources in the Printing, Coating and Dyeing of Fabrics and Other Textiles... SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants: Printing, Coating, and Dyeing...—Emission Limits for New or Reconstructed and Existing Affected Sources in the Printing, Coating and Dyeing...

  18. Analyzing the role of the PPP in the development of the Vietnamese Telecoms market

    DEFF Research Database (Denmark)

    Do Manh, Thai; Falch, Morten; Williams, Idongesit

    2016-01-01

    to facilitate Public-owned infrastructure. The market outcome in Vietnam negates the belief that private sector financing for infrastructure development is best practice. Using the Principal Agency theory, PPP in Vietnam is analyzed to understand the role of each segment in the facilitation of fixed...

  19. Testing for long horizon UIP using PPP-Based Exchange Rate Expectations

    NARCIS (Netherlands)

    Berk, J.M.; Knot, K.

    2001-01-01

    This paper revisits the uncovered interest parity relation. It supplements existing work in two ways: It focuses on long instead of short-term interest rates, and, related to that, employs exchange rate expectations derived from purchasing power parity (PPP) instead of actual outcomes. Among the

  20. An Investigation of the Relationship between PPP1R3 Gene Polymorphism and Type 2 Diabetes

    Directory of Open Access Journals (Sweden)

    Soyar Sari

    2017-07-01

    Full Text Available Background and Objectives: PPP1R3 is one of the genes confirmed to be associated with type 2 diabetes. This gene is located on the long arm of chromosome 7 and encodes protein phosphatase 1 (PP1, which has serine/threonine phosphatase activity. There is a polymorphic region in the 3'UTR region of this gene, which creates ARE1 and ARE2 alleles. The aim of this study was to determine the relationship between PPP1R3 gene polymorphism and type 2 diabetes. Methods: In this case-control study, 100 patients with type 2 diabetes and 100 healthy individuals, were randomly selected from the study population. PPP1R3 gene polymorphism was analyzed using PCR-RFLP method. Comparison of variables between healthy and patient groups, was performed by t-test, allele frequency by counting, and calculation of their ratio by chi-square test, and the population was confirmed to be in Hardy-Weinberg equilibrium. Distribution of genotypes and alleles was compared between healthy and patient groups. Results: In this study, there was no significant difference between the frequency of genotypes and frequency of alleles in subjects with type 2 diabetes and healthy control subjects. Conclusion: The findings of this study indicated that polymorphisms in the 3'UTR region of PPP1R3 gene is not associated with type 2 diabetes.

  1. PROPOSTA DE MÉTODO DE REDE GNSS POR PPP E ANÁLISE DE CONFIABILIDADE

    Directory of Open Access Journals (Sweden)

    Carolina Collischonn

    Full Text Available Embora o método de posicionamento GNSS tradicionalmente utilizado em redes geodésicas seja o relativo. O nível de acurácia obtido com o método de Posicionamento por Ponto Preciso (PPP abre uma nova perspectiva. No PPP são utilizados dados de apenas um receptor GNSS e é fundamental o uso de efemérides e correções dos relógios dos satélites, ambas com alta precisão. Neste artigo é apresentada uma metodologia de desenvolvimento de rede utilizando dados GNSS processados pelo método de PPP e a verificação da sua potencialidade em aplicações geodésicas. Os dados utilizados são de estações GNSS pertencentes à RBMC/IBGE. O serviço de processamento de PPP utilizado é o fornecido pelo IBGE. A partir dos resultados foram feitas análises para verificar a aplicabilidade da metodologia descrita em rede com dados GNSS de 24, 6 e 4 horas de rastreio. Após o ajustamento, os testes global e data snooping foram aplicados e também foi analisada a confiabilidade da rede com o objetivo de avaliar o método proposto, além de verificar a influência do tempo de rastreio nos resultados.

  2. Multi-GNSS phase delay estimation and PPP ambiguity resolution: GPS, BDS, GLONASS, Galileo

    Science.gov (United States)

    Li, Xingxing; Li, Xin; Yuan, Yongqiang; Zhang, Keke; Zhang, Xiaohong; Wickert, Jens

    2018-06-01

    This paper focuses on the precise point positioning (PPP) ambiguity resolution (AR) using the observations acquired from four systems: GPS, BDS, GLONASS, and Galileo (GCRE). A GCRE four-system uncalibrated phase delay (UPD) estimation model and multi-GNSS undifferenced PPP AR method were developed in order to utilize the observations from all systems. For UPD estimation, the GCRE-combined PPP solutions of the globally distributed MGEX and IGS stations are performed to obtain four-system float ambiguities and then UPDs of GCRE satellites can be precisely estimated from these ambiguities. The quality of UPD products in terms of temporal stability and residual distributions is investigated for GPS, BDS, GLONASS, and Galileo satellites, respectively. The BDS satellite-induced code biases were corrected for GEO, IGSO, and MEO satellites before the UPD estimation. The UPD results of global and regional networks were also evaluated for Galileo and BDS, respectively. As a result of the frequency-division multiple-access strategy of GLONASS, the UPD estimation was performed using a network of homogeneous receivers including three commonly used GNSS receivers (TRIMBLE NETR9, JAVAD TRE_G3TH DELTA, and LEICA). Data recorded from 140 MGEX and IGS stations for a 30-day period in January in 2017 were used to validate the proposed GCRE UPD estimation and multi-GNSS dual-frequency PPP AR. Our results show that GCRE four-system PPP AR enables the fastest time to first fix (TTFF) solutions and the highest accuracy for all three coordinate components compared to the single and dual system. An average TTFF of 9.21 min with 7{°} cutoff elevation angle can be achieved for GCRE PPP AR, which is much shorter than that of GPS (18.07 min), GR (12.10 min), GE (15.36 min) and GC (13.21 min). With observations length of 10 min, the positioning accuracy of the GCRE fixed solution is 1.84, 1.11, and 1.53 cm, while the GPS-only result is 2.25, 1.29, and 9.73 cm for the east, north, and vertical

  3. Assessment of the Contribution of BeiDou GEO, IGSO, and MEO Satellites to PPP in Asia—Pacific Region

    Directory of Open Access Journals (Sweden)

    Qile Zhao

    2015-12-01

    Full Text Available In contrast to the US Global Positioning System (GPS, the Russian Global Navigation Satellite System (GLONASS and the European Galileo, the developing Chinese BeiDou satellite navigation system (BDS consists of not only Medium Earth Orbit (MEO, but also Geostationary Orbit (GEO as well as Inclined Geosynchronous Orbit (IGSO satellites. In this study, the Precise Point Positioning (PPP and PPP with Integer Ambiguity Resolution (IAR are obtained. The contributions of these three different types of BDS satellites to PPP in Asia-Pacific region are assessed using data from selected 20 sites over more than four weeks. By using various PPP cases with different satellite combinations, in general, the largest contribution of BDS IGSO among the three kinds of BDS satellites to the reduction of convergence time and the improvement of positioning accuracy, particularly in the east direction, is identified. These PPP cases include static BDS only solutions and static/kinematic ambiguity-float and -fixed PPP with the combination of GPS and BDS. The statistical results demonstrate that the inclusion of BDS GEO and MEO satellites can improve the observation condition and result in better PPP performance as well. When combined with GPS, the contribution of BDS to the reduction of convergence time is, however, not as significant as that of GLONASS. As far as the positioning accuracy is concerned, GLONASS improves the accuracy in vertical component more than BDS does, whereas similar improvement in horizontal component can be achieved by inclusion of BDS IGSO and MEO as GLONASS.

  4. Ablation of PPP1R3G reduces glycogen deposition and mitigates high-fat diet induced obesity.

    Science.gov (United States)

    Zhang, Yongxian; Gu, Jin; Wang, Lin; Zhao, Zilong; Pan, Yi; Chen, Yan

    2017-01-05

    Glycogen and triglyceride are two major forms of energy storage in the body and provide the fuel during different phases of food deprivation. However, how glycogen metabolism is linked to fat deposition in adipose tissue has not been clearly characterized. We generated a mouse model with whole-body deletion of PPP1R3G, a glycogen-targeting subunit of protein phosphatase-1 required for glycogen synthesis. Upon feeding with high-fat diet, the body weight and fat composition are significantly reduced in the PPP1R3G -/- mice compared to the wild type controls. The metabolic rate of the mice as measured by O 2 consumption and CO 2 production is accelerated by PPP1R3G deletion. The high-fat diet-induced liver steatosis is also slightly relieved by PPP1R3G deletion. The glycogen level in adipose tissue is reduced by PPP1R3G deletion. In 3T3L1 cells, overexpression of PPP1R3G leads to increases of both glycogen and triglyceride levels. In conclusion, our study indicates that glycogen is actively involved in fat accumulation in adipose tissue and obesity development upon high-fat diet. Our study also suggests that PPP1R3G is an important player that links glycogen metabolism to lipid metabolism in vivo. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  5. 40 CFR Table 6 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Science.gov (United States)

    2010-07-01

    ... when insufficient monitoring data are collected. e Boiler or Process Heater with a design heat input... operating value established in the NCS or operating—PR. d,e Condenser f Exit (product side) temperature 1... operating permit—PR. d,e Absorber, Condenser, and Carbon Adsorber (as an alternative to the above...

  6. 40 CFR Table 5 to Subpart Ppp of... - Process Vents From Batch Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Science.gov (United States)

    2010-07-01

    ... all instances when monitoring data are not collected—PR. d,e If a base absorbent is used, report all p... all instances when monitoring data are not collected—PR. d,e Catalytic Incinerator Temperature... instances when monitoring data are not collected. e Boiler or Process Heater with a design heat input...

  7. 5 CFR Appendix A to Subpart F of... - List of Events for Which Inclusion of NAFI Service May Affect the Rate of Annuity Payable

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false List of Events for Which Inclusion of... of Part 847—List of Events for Which Inclusion of NAFI Service May Affect the Rate of Annuity Payable... of annuity. CSRS disability retirement Commencing date of annuity. 1 FERS disability retirement First...

  8. Chemical Synthesis of a 5'-Terminal TMG-Capped Triribonucleotide m(3)(2,2,7)G(5)(')pppAmpUmpA of U1 RNA.

    Science.gov (United States)

    Sekine, Mitsuo; Kadokura, Michinori; Satoh, Takahiko; Seio, Kohji; Wada, Takeshi; Fischer, Utz; Sumpter, Vicki; Lührmann, Reinhard

    1996-06-26

    The 5'-terminal TMG-capped triribonucleotide, m(3)(2,2,7)G(5)(')pppAmpUmpA, has been synthesized by condensation of an appropriately protected triribonucleotide derivative of ppAmpUmpA with a new TMG-capping reagent. During this total synthesis, it was found that the regioselective 2'-O-methylation of 3',5'-O-(1,1,3,3-tetraisopropyldisiloxane-1,3-diyl)-N-(4-monomethoxytrityl)adenosine was achieved by use of MeI/Ag(2)O without affecting the base moiety. A new route to 2-N,2-N-dimethylguanosine from guanosine via a three-step reaction has also been developed by reductive methylation using paraformaldehyde and sodium cyanoborohydride. These key intermediates were used as starting materials for the construction of a fully protected derivative of pAmpUmpA and a TMG-capping reagent of Im-pm(3)(2,2,7)G. The target TMG-capped tetramer, m(3)(2,2,7)G(5)(')pppAmpUmpA, was synthesized by condensation of a partially protected triribonucleotide 5'-terminal diphosphate species, ppA(MMTr)mpUmpA, with Im-pm(3)(2,2,7)G followed by treatment with 80% acetic acid. The structure of m(3)(2,2,7)G(5)(')pppAmpUmpA was characterized by (1)H and (31)P NMR spectroscopy as well as enzymatic assay using snake venom phosphodiesterase, calf intestinal phosphatase, and nuclease P1.

  9. Benefit Assignment in PPP%公私合作制(PPP)模式下的利益分配问题探讨

    Institute of Scientific and Technical Information of China (English)

    徐霞; 郑志林

    2009-01-01

    公私合作制(Public-Private Partnership,简称PPP)在公共基础设施建设和公共事务管理中得到了越来越广泛的运用.但目前的研究大多停留在解释PPP概念和风险分摊层面上,而很少涉及PPP的利益分配问题.论文试从PPP风险分摊、资本结构和控制权三个维度来探讨PPP中的利益分配.

  10. INTEGRITY ANALYSIS OF REAL-TIME PPP TECHNIQUE WITH IGS-RTS SERVICE FOR MARITIME NAVIGATION

    Directory of Open Access Journals (Sweden)

    M. El-Diasty

    2017-10-01

    Full Text Available Open sea and inland waterways are the most widely used mode for transporting goods worldwide. It is the International Maritime Organization (IMO that defines the requirements for position fixing equipment for a worldwide radio-navigation system, in terms of accuracy, integrity, continuity, availability and coverage for the various phases of navigation. Satellite positioning systems can contribute to meet these requirements, as well as optimize marine transportation. Marine navigation usually consists of three major phases identified as Ocean/Coastal/Port approach/Inland waterway, in port navigation and automatic docking with alert limit ranges from 25 m to 0.25 m. GPS positioning is widely used for many applications and is currently recognized by IMO for a future maritime navigation. With the advancement in autonomous GPS positioning techniques such as Precise Point Positioning (PPP and with the advent of new real-time GNSS correction services such as IGS-Real-Time-Service (RTS, it is necessary to investigate the integrity of the PPP-based positioning technique along with IGS-RTS service in terms of availability and reliability for safe navigation in maritime application. This paper monitors the integrity of an autonomous real-time PPP-based GPS positioning system using the IGS real-time service (RTS for maritime applications that require minimum availability of integrity of 99.8 % to fulfil the IMO integrity standards. To examine the integrity of the real-time IGS-RTS PPP-based technique for maritime applications, kinematic data from a dual frequency GPS receiver is collected onboard a vessel and investigated with the real-time IGS-RTS PPP-based GPS positioning technique. It is shown that the availability of integrity of the real-time IGS-RTS PPP-based GPS solution is 100 % for all navigation phases and therefore fulfil the IMO integrity standards (99.8 % availability immediately (after 1 second, after 2 minutes and after 42 minutes

  11. Integrity Analysis of Real-Time Ppp Technique with Igs-Rts Service for Maritime Navigation

    Science.gov (United States)

    El-Diasty, M.

    2017-10-01

    Open sea and inland waterways are the most widely used mode for transporting goods worldwide. It is the International Maritime Organization (IMO) that defines the requirements for position fixing equipment for a worldwide radio-navigation system, in terms of accuracy, integrity, continuity, availability and coverage for the various phases of navigation. Satellite positioning systems can contribute to meet these requirements, as well as optimize marine transportation. Marine navigation usually consists of three major phases identified as Ocean/Coastal/Port approach/Inland waterway, in port navigation and automatic docking with alert limit ranges from 25 m to 0.25 m. GPS positioning is widely used for many applications and is currently recognized by IMO for a future maritime navigation. With the advancement in autonomous GPS positioning techniques such as Precise Point Positioning (PPP) and with the advent of new real-time GNSS correction services such as IGS-Real-Time-Service (RTS), it is necessary to investigate the integrity of the PPP-based positioning technique along with IGS-RTS service in terms of availability and reliability for safe navigation in maritime application. This paper monitors the integrity of an autonomous real-time PPP-based GPS positioning system using the IGS real-time service (RTS) for maritime applications that require minimum availability of integrity of 99.8 % to fulfil the IMO integrity standards. To examine the integrity of the real-time IGS-RTS PPP-based technique for maritime applications, kinematic data from a dual frequency GPS receiver is collected onboard a vessel and investigated with the real-time IGS-RTS PPP-based GPS positioning technique. It is shown that the availability of integrity of the real-time IGS-RTS PPP-based GPS solution is 100 % for all navigation phases and therefore fulfil the IMO integrity standards (99.8 % availability) immediately (after 1 second), after 2 minutes and after 42 minutes of convergence

  12. GPR used in combination with other NDT methods for assessing pavements in PPP projects

    Science.gov (United States)

    Loizos, Andreas; Plati, Christina

    2014-05-01

    In the recent decades, Public-Private Partnerships (PPP) has been adopted for highway infrastructure procurement in many countries. PPP projects typically take the form of a section of highway and connecting roadways which are to be construction and managed for a given concession period. Over the course of the highway concession period, the private agency takes over the pavement maintenance and rehabilitation duties. On this purpose, it is critical to find the most cost effective way to maintain the infrastructure in compliance with the agreed upon performance measures and a Pavement Management Systems (PMS) is critical to the success of this process. For the prosperous operation of a PMS it is necessary to have appropriate procedures for pavement monitoring and evaluation, which is important in many areas of pavement engineering. Non Destructive Testing (NDT) has played a major role in pavement condition monitoring, assessments and evaluation accomplishing continuous and quick collection of pavement data. The analysis of this data can lead to indicators related to trigger values (criteria) that define the pavement condition based on which the pavement "health" is perceived helping decide whether there is the need or not to intervene in the pavement. The accomplished perception appoints required management activities for preserving pavements in favor not only of the involved highway/road agencies but also of users' service. Amongst NDT methods Ground Penetrating Radar (GPR) seems to be a very powerful toll, as it provides a range of condition and construction pavement information. It can support effectively the implementation of PMS activities in the framework of pavement monitoring and evaluation. Given that, the present work aims to the development and adaptation of a protocol for the use of GPR in combination with other NDT methods, such as Falling Weight Deflectometer (FWD), for assessing pavements in PPP projects. It is based on the experience of Laboratory of

  13. Transport PPP decisions in Korea: value for money assessment and risk quantification

    OpenAIRE

    Park, Ji Hong

    2014-01-01

    Value for money (VFM) assessment has been adopted worldwide as a public private partnership (PPP) decision methodology. In terms of quantitative assessment, this method considers only the public sector cost, assuming completion delay does not occur between delivery alternatives, so it is difficult to use where systematic completion delays in the conventional delivery are expected to occur like in Korea. Therefore, in this research a Modified VFM methodology was developed to consider completio...

  14. Characteristics of the process K+p→K+anti ppp at 12 GeV/c

    International Nuclear Information System (INIS)

    Armstrong, T.A.; Frame, D.; Hughes, I.S.; Kumar, B.R.; Lewis, G.M.; Macallister, J.B.; Stewart, D.T.; Turnbull, R.M.

    1979-01-01

    Data are presented on the reaction K + p→K + anti ppp at 12 GeV/c from an experiment using the OMEGA spectrometer at CERN. A clear Λ(1520) signal is observed in the process K + p→anti Λ(1520)pp and angular distributions and correlations are presented for this process. The angular distributions for the reaction in which anti Λ(1520) is not produced show an appreciable backward K + peak. (Auth.)

  15. Multi-GNSS PPP-RTK: From Large- to Small-Scale Networks

    Directory of Open Access Journals (Sweden)

    Nandakumaran Nadarajah

    2018-04-01

    Full Text Available Precise point positioning (PPP and its integer ambiguity resolution-enabled variant, PPP-RTK (real-time kinematic, can benefit enormously from the integration of multiple global navigation satellite systems (GNSS. In such a multi-GNSS landscape, the positioning convergence time is expected to be reduced considerably as compared to the one obtained by a single-GNSS setup. It is therefore the goal of the present contribution to provide numerical insights into the role taken by the multi-GNSS integration in delivering fast and high-precision positioning solutions (sub-decimeter and centimeter levels using PPP-RTK. To that end, we employ the Curtin PPP-RTK platform and process data-sets of GPS, BeiDou Navigation Satellite System (BDS and Galileo in stand-alone and combined forms. The data-sets are collected by various receiver types, ranging from high-end multi-frequency geodetic receivers to low-cost single-frequency mass-market receivers. The corresponding stations form a large-scale (Australia-wide network as well as a small-scale network with inter-station distances less than 30 km. In case of the Australia-wide GPS-only ambiguity-float setup, 90% of the horizontal positioning errors (kinematic mode are shown to become less than five centimeters after 103 min. The stated required time is reduced to 66 min for the corresponding GPS + BDS + Galieo setup. The time is further reduced to 15 min by applying single-receiver ambiguity resolution. The outcomes are supported by the positioning results of the small-scale network.

  16. Is Public-Private Partnership Obsolete? Assessing the Obstacles and Shortcomings of PPP

    OpenAIRE

    Claude Ménard

    2013-01-01

    Chapitre dans: Piet de Vries and Etienne B. Yehoue, The Routledge Companion to Public-Private Partnerships, London, Routledge. Ouvrage à paraitre (publication prévue: été 2012); Public-Private Partnership has been high on the agenda of public decision makers since the 1990's. Primarily a contractual approach to the delivery of infrastructures, goods and services traditionally provided by the public sector or by private operators submitted to tight regulation, PPP is also a very special contra...

  17. Forms of international movement of capital with special emphasis on the PPP and concessions

    Directory of Open Access Journals (Sweden)

    Šovran Sanja

    2016-01-01

    Full Text Available The state has always cooperated with the private sector in order to implement various activities in the best interest of public. The first models of public-private partnerships (PPP appeared at the time of the Roman Empire in the context of public works in construction of public baths, markets and ports. Contemporary international movement of capital is a phenomenon that has existed for over a century. When discussing the PPP in modern day terms, the expansion of private involvement in the public sector starts in the 1970s and the 1980s of the previous century, in public infrastructure projects and in most developed economies. The primary purpose of these arrangements is to reduce expenditures in state budgets, but also to achieve faster and better execution of work, reduce risk and efficiently manage the projects. This paper will briefly present the evolution of PPPs and concessions, with an emphasis on understanding money and capital throughout the evolution of PPP, contemporary forms of movement of capital, as well as equity in terms of globalization. The subject of this paper are also examples of the important PPPs and concessions from the construction of the Suez Canal until today.

  18. PPP-RTK by means of S-system theory: revisiting the undifferenced, uncombined network model and a case study

    Science.gov (United States)

    Zhang, Baocheng; Yuan, Yunbin

    2017-04-01

    A synthesis of two prevailing Global Navigation Satellite System (GNSS) positioning technologies, namely the precise point positioning (PPP) and the network-based real-time kinematic (NRTK), results in the emergence of the PPP-RTK. This new concept preferably integrates the typical advantage of PPP (e.g. flexibility) and that of NRTK (e.g. efficiency), such that it enables single-receiver users to achieve high positioning accuracy with reasonable timeliness through integer ambiguity resolution (IAR). The realization of PPP-RTK needs to accomplish two sequential tasks. The first task is to determine a class of corrections including, necessarily, the satellite orbits, the satellite clocks and the satellite phase (and code, in case of more than two frequencies) biases at the network level. With these corrections, the second task, then, is capable of solving for the ambiguity-fixed, absolute position(s) at the user level. In this contribution, we revisit three variants (geometry-free, geometry-fixed, and geometry- and satellite-clock-fixed) of undifferenced, uncombined PPP-RTK network model and discuss their implications for practical use. We carry out a case study using multi-day, dual-frequency GPS data from the Crustal Movement Observation Network of China (CMONOC), aiming to assess the (static and kinematic) positioning performance (in terms of time-to-first-fix and accuracy) that is achievable by PPP-RTK users across China.

  19. PRINSIP PROPORSIONALITAS DAN GOVERNANCE TERHADAP ALOKASI DAN TRANSFER RISIKO DALAM SKEMA KERJASAMA PUBLIC-PRIVATE PARTNERSHIP (PPP

    Directory of Open Access Journals (Sweden)

    yuniarti yuniarti

    2017-09-01

    Full Text Available The high level of Foreign Direct Investment (FDI is also supported by the availability of infrastructure to the remote area where the investment will be implemented. However, with limited funds from both APBN and APBD, infrastructure development can not be fully done by the government. Therefore, the government will cooperate with the investor (private in the implementation of infrastructure development known as public private partnership. The main problem in implementing PPP is the allocation of risk to PPP projects. The different bargaining positions between the government and the private sector resulted in the fact that most of them impose risks on private parties (private. Implementation of PPP is closely related to the emergence of various risks including and not limited to regulatory risks, force majeure, etc. If there is no risk allocation arrangement proportionally based on governance principles, it weakens the pattern of PPP cooperation in Indonesia. PPP as one form of risk sharing in infrastructure investment should not release the role and government support to private parties / investors. Even in practice, PPP implementation in Indonesia only relies on BOT (Build Operate and Transfer scheme which is expected to minimize government support in project implementation. This will ultimately lead to project failure.

  20. Subpart DD Training Presentations

    Science.gov (United States)

    EPA has produced the following training presentation(s) for reporters subject to this subpart. Generally, these presentations explain the rule or show how to use the reporting system e-GGRT to submit annual GHG reports to EPA.

  1. Subpart AA Training Presentations

    Science.gov (United States)

    EPA has produced the following training presentation(s) for reporters subject to this subpart. Generally, these presentations explain how to use the reporting system e-GGRT to submit annual GHG reports to EPA.

  2. Subpart W Training Presentations

    Science.gov (United States)

    EPA has produced the following training presentation(s) for reporters subject to this subpart. Generally, these presentations explain the rule or show how to use the reporting system e-GGRT to submit annual GHG reports to EPA.

  3. Performance Analysis of Web-Based Ppp Services with DİFFERENT Visibility Conditions

    Science.gov (United States)

    Albayrak, M.; Erkaya, H.; Ozludemir, M. T.; Ocalan, T.

    2016-12-01

    GNSS is being used effectively to precise position for many measuring and geodetic purposes at the present time. There is an increasing variety of these systems including the post-processing calculations in terms of number, quality and features and many different techniques are developed to determine position. Precise positioning intend to derive requires user experience and scientific or commercial software with costly license fees. However, in recent years important alternatives to this software that are user friendly and offer free web-based online precise point positioning service have become widely used in geodetic applications. The aim of this study is to test the performance of PPP techniques on ground control points with different visibility conditions. Within this framework, static observations were carried out for three hours a day repeatedly for six days, in YTU Davutpasa Campus on three different ground control points. The locations of these stations were selected by taking into account the impact of natural (trees, etc.) and artificial (buildings, etc.) obstacles. In order to compare the obtained GPS observations with PPP performances, first of all the accurate coordinates of the control points were computed with relative positioning technique in connection with the IGS stations using Bernese v5.0 software. Afterwards, three different web-based positioning services (CSRS-PPP, magicGNSS, GAPS) were used to analyze the GPS observations via PPP technique. To compare all of the obtained results, ITRF2008 datum measurement epoch coordinates were preferred by taking the service result criteria into consideration. In coordinate comparison, for the first station located nearby a building and possibly subjected to multipath effect horizontal discrepancies vary between 2-14.5 cm while vertical differences are between 3.5-16 cm. For the second point located partly in a forestry area, the discrepancies have been obtained as 1.5-8 cm and 2-10 cm for horizontal and

  4. Risk Identification and Assessment in PPP Infrastructure Projects using Fuzzy Analytical Hierarchy Process and Life-Cycle Methodology

    Directory of Open Access Journals (Sweden)

    Jie Li

    2012-11-01

    Full Text Available To fulfil the increasing demands of the public,Public Private Partnership (PPP has beenincreasingly used to procure infrastructureprojects, such as motor ways, bridges, tunnelsand railways. However, the risks involved inPPP projects are unique and dynamic due tolarge amount of investment and longconcession period. This paper aims to developa risk identification framework from theperspectives of project life cycle, and anassessment framework for risks associatedwith PPP project using fuzzy analyticalhierarchy process (AHP. First the paperreviews the current literature to identifycommon risks in PPP infrastructure projectsand classification methods used. The risksidentified from the literature were classifiedusing project life cycle perspectives. Followingthat, the paper presents the advantages offuzzy AHP. Furthermore, the paper provides aframework for assessment of risks in PPPprojects followed by an illustrative examplewhere the data was obtained from surveyquestionnaires. The paper concludes that risksassociated in PPP infrastructure projects areunique and therefore it is beneficial to classifythem from project life cycle perspectives, andthe proposed fuzzy AHP method is suitable forthe assessment of these risks.

  5. Evaluation on real-time dynamic performance of BDS in PPP, RTK, and INS tightly aided modes

    Science.gov (United States)

    Gao, Zhouzheng; Li, Tuan; Zhang, Hongping; Ge, Maorong; Schuh, Harald

    2018-05-01

    Since China's BeiDou satellite navigation system (BDS) began to provide regional navigation service for Asia-Pacific region after 2012, more new generation BDS satellites have been launched to further expand BDS's coverage to be global. In this contribution, precise positioning models based on BDS and the corresponding mathematical algorithms are presented in detail. Then, an evaluation on BDS's real-time dynamic positioning and navigation performance is presented in Precise Point Positioning (PPP), Real-time Kinematic (RTK), Inertial Navigation System (INS) tightly aided PPP and RTK modes by processing a set of land-borne vehicle experiment data. Results indicate that BDS positioning Root Mean Square (RMS) in north, east, and vertical components are 2.0, 2.7, and 7.6 cm in RTK mode and 7.8, 14.7, and 24.8 cm in PPP mode, which are close to GPS positioning accuracy. Meanwhile, with the help of INS, about 38.8%, 67.5%, and 66.5% improvements can be obtained by using PPP/INS tight-integration mode. Such enhancements in RTK/INS tight-integration mode are 14.1%, 34.0%, and 41.9%. Moreover, the accuracy of velocimetry and attitude determination can be improved to be better than 1 cm/s and 0.1°, respectively. Besides, the continuity and reliability of BDS in both PPP and RTK modes can also be ameliorated significantly by INS during satellite signal missing periods.

  6. PRICING OF GOVERMENT GARANTEES IN PPP USING REAL OPTIONS: BRAZILIAN HIGH SPEED RAIL CASE STUDY

    OpenAIRE

    LEANDRO DIMURO MONTEIRO

    2014-01-01

    A precificação de garantias governamentais em PPP é um tema atual e é resolvido com o uso da teoria de opções reais (TOR). Normalmente, as garantias mínimas de demanda ou receita são modeladas como PUTs em que o concessionário está comprado e o governo vendido e é calculado o ganho que adicionam ao projeto. Entretanto, pouco se discute sobre o cálculo do passivo que tais garantias podem representar para os cofres públicos no longo prazo. Este trabalho usa o segundo edital do...

  7. Layout ppp

    African Journals Online (AJOL)

    Nubidga

    November) 2011 in plots established in 2010 using a factorial design with 4 cow dung application levels. (0, 7.5, 15 ... showed that cow dung application appeared to have an ameliorating effect on the growth and fresh yield .... Package for Social Sciences (SPSS) Standard ... to evaluate the effect of interaction and the effect.

  8. Layout ppp

    African Journals Online (AJOL)

    Nubidga

    epistemic system in which the local knowledge systems and the actions of the local farmer will ... has become a global concern since we are sharing one .... predict and knowing to act. .... We may be thinking of abandoning the long-range view.

  9. Layout ppp

    African Journals Online (AJOL)

    Nubidga

    Evaluation of mineral contents in Cleome gynandra leaves and stalks from Burkina Faso. Research Article. Igor W. K. Ouédraogo1,2, Carole Tranchant2 and Yvonne L. Bonzi-Coulibaly1*. 1 Laboratoire de Chimie Organique : Structure et Réactivité, Département de Chimie, Université de. Ouagadougou, 03 BP 7021 ...

  10. Layout ppp

    African Journals Online (AJOL)

    Nubidga

    (for Francophones). Key Words: Audiovisual translation, screen translation, Subtitling, intralanguage subtitling, academic literacy, ... accessibility aid for a target audience which is deaf or ... availability of subtitled audiovisual material by using subtitled .... This information is used to ..... Input on Implicit and Explicit memory: An.

  11. Layout ppp

    African Journals Online (AJOL)

    Nubidga

    Climate change impact has remained a serious threat to man and more particularly in the ... of mass migration and the emergence of environmental refugees, rural unemployment of the .... increasing trends of global warming have opened up.

  12. Layout ppp

    African Journals Online (AJOL)

    Nubidga

    Malaria is Cameroon's most serious and complex public health problem. Its transmission ... emergence of new parasite strains, expansion of host range due to human population growth and .... phenomenon is closely linked to global warming.

  13. Layout ppp

    African Journals Online (AJOL)

    Nubidga

    Data on cocoa yield, flowering, and pod infestation were obtained through semi- ... and analyzed using univariate, bivariate and graphical techniques. .... Univariate and multivariate statistical techniques ..... Journal of Applied Meteorology.

  14. Layout ppp

    African Journals Online (AJOL)

    Nubidga

    Méthémoglobinémie, Stratégies d'adaptation, Mayo Tsanaga. Wilson Y. Fantong1*, Alain F. Takounjou1, Emilia Bi. Fantong2, Hycinth S. Banseka3, Cletus D. Gwanfogbe4, Samuel. N. Ayonghe5, and Gregory .Z. Tanyileke1. 1 Institute of Geological ...

  15. Layout ppp

    African Journals Online (AJOL)

    Nubidga

    the two Atlantic coastal basins lining the coast of. Cameroon (Fig. 1) and 1a) ... sins seen along the Southern Atlantic coast of Africa ... typical Tropical Equatorial Rain Forest characterized ..... environments like lagoons and estuaries but will not.

  16. Improved PPP Ambiguity Resolution Considering the Stochastic Characteristics of Atmospheric Corrections from Regional Networks

    Science.gov (United States)

    Li, Yihe; Li, Bofeng; Gao, Yang

    2015-01-01

    With the increased availability of regional reference networks, Precise Point Positioning (PPP) can achieve fast ambiguity resolution (AR) and precise positioning by assimilating the satellite fractional cycle biases (FCBs) and atmospheric corrections derived from these networks. In such processing, the atmospheric corrections are usually treated as deterministic quantities. This is however unrealistic since the estimated atmospheric corrections obtained from the network data are random and furthermore the interpolated corrections diverge from the realistic corrections. This paper is dedicated to the stochastic modelling of atmospheric corrections and analyzing their effects on the PPP AR efficiency. The random errors of the interpolated corrections are processed as two components: one is from the random errors of estimated corrections at reference stations, while the other arises from the atmospheric delay discrepancies between reference stations and users. The interpolated atmospheric corrections are then applied by users as pseudo-observations with the estimated stochastic model. Two data sets are processed to assess the performance of interpolated corrections with the estimated stochastic models. The results show that when the stochastic characteristics of interpolated corrections are properly taken into account, the successful fix rate reaches 93.3% within 5 min for a medium inter-station distance network and 80.6% within 10 min for a long inter-station distance network. PMID:26633400

  17. Mechanism design of reverse auction on concession period and generalized quality for PPP projects

    Institute of Scientific and Technical Information of China (English)

    Xianjia WANG; Shiwei WU

    2017-01-01

    Reverse auctions of PPP projects usually require the bid to specify several characteristics of quality and the concession period to be fulfilled.This paper sets up a summary function of generalized quality,which contributes to reducing the dimensions of information.Thus,the multidimensional reverse auction model of a PPP project can be replaced by a two-dimensional direct mechanism based on the concession period and the generalized quality.Based on the theory of the revelation principle,the feasibility conditions,equilibrium solution and generalized quality requirements of such a mechanism,considering the influence of a variable investment structure are described.Moreover,two feasible multidimensional reverse auctions for implementing such a direct mechanism:Adjusting the scoring function and establishing a special reverse auction rule are built.The analysis shows that in these types of reverse auctions,optimal allocation can be achieved,the social benefit under the incomplete information will be maximized,and the private sector with the highest integrated management level wins the bid.In such a direct mechanism,the investment and financial pressure of the public sector can be reduced.

  18. Electronic structure of PPP@ZnO from all-electron quasiarticle calculations

    Science.gov (United States)

    Höffling, Benjamin; Nabok, Dimitri; Draxl, Claudia; Condensed Matter Theory Group, Humboldt University Berlin Team

    We investigate the electronic properties of poly(para-phenylene) (PPP) adsorbed on the non-polar (001) surface of rocksalt (rs) ZnO using all-electron density functional theory (DFT) as well as quasiparticle (QP) calculations within the GW approach. A particular focus is put on the electronic band discontinuities at the interface, where we investigate the impact of quantum confinement, molecular polarization, and charge rearrangement. For our prototypical system, PPP@ZnO, we find a type-I heterostructure. Comparison of the band offsets derived from a QP-treatment of the hybrid system with predictions based on mesoscopic methods, like the Shockley-Anderson model or alignment via the electrostatic potential, reveals the inadequacy of these simple approaches for the prediction of the electronic structure of such inorganic/organic heterosystems. Finally, we explore the optical excitations of the interface compared to the features of the pristine components and discuss the methodological implications for the ab-initio treatment of interface electronics.

  19. Heterologous production of the stain solving peptidase PPP1 from Pleurotus pulmonarius.

    Science.gov (United States)

    Leonhardt, Robin-Hagen; Krings, Ulrich; Berger, Ralf G; Linke, Diana

    2016-05-01

    A novel stain solving subtilisin-like peptidase (PPP1) was identified from the culture supernatant of the agaricomycete Pleurotus pulmonarius. It was purified to homogeneity using a sequence of preparative isoelectric focusing, anion exchange and size exclusion chromatography. Peptides were identified by ab initio sequencing (nLC-ESI-QTOF-MS/MS), characterizing the enzyme as a member of the subtilase family (EC 3.4.21.X). An expression system was established featuring the pPIC9K vector, an alternative Kozak sequence, the codon optimized gene ppp1 gene without the native signal sequence with C-terminal hexa-histidine tag, and Pichia pastoris GS115 as expression host. Intracellular active enzyme was obtained from cultivations in shake flasks and in a five liter bioreactor. With reaction optima of 40 °C and a pH > 8.5, considerable bleaching of pre-stained fabrics (blood, milk and India ink), and the possibility of larger-scale production, the heterologous enzyme is well suitable for detergent applications, especially at lower temperatures as part of a more energy- and cost-efficient washing process. Showing little sequence similarity to other subtilases, this unique peptidase is the first subtilisin-like peptidase from Basidiomycota, which has been functionally produced in Pichia pastoris.

  20. Ensuring living condition for ageing population by public–private partnership (PPP

    Directory of Open Access Journals (Sweden)

    Konjar Miha

    2018-01-01

    Full Text Available Lack of financial resources has become one of the main issues in fulfilling social and physical needs in urban development. The declining levels of public resources make the collaboration between public and private investors necessary. When facing the challenges of ageing population, shared investment may contribute to the appropriate development of sheltered housing to meet the goals of spatial planning as well as certain standards at the level of urban design. By ensuring appropriate living conditions for all generations such urban PPP projects may contribute to the fulfilment of the public interest. The paper presents practice of PPP implementation in Ljubljana, Slovenia, where local authority with the collaboration of private partners ensured more than 400 sheltered apartments in the last years. Examples show the extension of the idea from the 70s onwards in finding new models of housing for the aging population. The development of new models can be a good example of strengthening the cooperation between public and private partners in the field of urban development practice.

  1. Stakeholders' perception of key performance indicators (KPIs of public-private partnership (PPP projects

    Directory of Open Access Journals (Sweden)

    Olabode Emmanuel Ogunsanmi

    2013-12-01

    Full Text Available The study investigates key performance indicators (KPIs that could improve performance of public-private partnership (PPP projects in Nigeria. The study objectives include a comparison of stakeholders’ perception on KPIs and to investigate if significant difference exists between stakeholders’ perceptions on most KPIs. A structured questionnaire was used to collect information from various respondents who were recently involved in PPP projects. Random sampling technique was used to select forty-five (45 respondents out of which thirty-one (31 responses were used for the data analysis. The results indicate that top KPIs for performance improvement are levels of design complexity and technological advancement, and return on investment. Stakeholders agree on most of the rankings of the KPIs. The general perception of stakeholders was similar on most KPIs except for a few divergent opinions. The study findings have an implication for policy and decision making such that stakeholders could pay special attention to the KPIs identified, that could improve construction project performance. Finally the study recommends further research to explore KPIs for other procurement options.

  2. Ensuring living condition for ageing population by public-private partnership (PPP)

    Science.gov (United States)

    Konjar, Miha; Nikšič, Matej; Grom, Janez Peter; Mujkić, Sabina; Fikfak, Alenka

    2018-03-01

    Lack of financial resources has become one of the main issues in fulfilling social and physical needs in urban development. The declining levels of public resources make the collaboration between public and private investors necessary. When facing the challenges of ageing population, shared investment may contribute to the appropriate development of sheltered housing to meet the goals of spatial planning as well as certain standards at the level of urban design. By ensuring appropriate living conditions for all generations such urban PPP projects may contribute to the fulfilment of the public interest. The paper presents practice of PPP implementation in Ljubljana, Slovenia, where local authority with the collaboration of private partners ensured more than 400 sheltered apartments in the last years. Examples show the extension of the idea from the 70s onwards in finding new models of housing for the aging population. The development of new models can be a good example of strengthening the cooperation between public and private partners in the field of urban development practice.

  3. 40 CFR Table 1 to Subpart Jj of... - General Provisions Applicability to Subpart JJ

    Science.gov (United States)

    2010-07-01

    ... Subpart JJ 1 Table 1 to Subpart JJ of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY.... JJ, Table 1 Table 1 to Subpart JJ of Part 63—General Provisions Applicability to Subpart JJ Reference Applies to subpart JJ Comment 63.1(a) Yes 63.1(b)(1) No Subpart JJ specifies applicability. 63.1(b)(2) Yes...

  4. Producing satisfactory outcomes in the implementation phase of PPP infrastructure projects: A fuzzy set qualitative comparative analysis of 27 road constructions in the Netherlands

    NARCIS (Netherlands)

    S. Verweij (Stefan)

    2015-01-01

    textabstractAn understudied aspect for the successful completion of PPP infrastructure projects is the extent to which they are satisfactorily implemented. Studying PPP implementation is important though, because well-planned projects can fail if project implementation is inadequately managed. This

  5. Prosthesis Prescription Protocol of the Arm (PPP-Arm) : The implementation of a national prosthesis prescription protocol

    NARCIS (Netherlands)

    Wijdenes, Paula; Brouwers, Michael; van der Sluis, Corry K

    BACKGROUND AND AIM: In order to create more uniformity in the prescription of upper limb prostheses by Dutch rehabilitation teams, the development and implementation of a Prosthesis Prescription Protocol of the upper limb (PPP-Arm) was initiated. The aim was to create a national digital protocol to

  6. Purchasing-power-parity (PPP) approach to energy-efficiency measurement: implications for energy and environmental policy

    International Nuclear Information System (INIS)

    Birol, Fatih; Okogu, B.E.

    1997-01-01

    The weaknesses of the traditional measure of national output are well known and, in recent years, efforts to find more appropriate alternatives have intensified. One such methodology is the PPP approach which may capture the real value of the GDP. In general, this approach raises the incomes of developing countries by a substantial amount, and this has serious implications for energy indicators on which policies are usually based. A further problem is that non-commercial energy is usually left out of energy-intensity calculations. We analyze the issue of energy-efficiency and carry out calculations based on three approaches: the traditional approach, the PPP-based income approach and an approach which includes non-commercial energy. The results confirm the limitations of using the PPP approach, as its results in a spuriously high energy-efficiency level suggesting high technological sophistication for developing countries. The inclusion of non-commercial energy gives more complete picture. The main conclusion is that applying the PPP method in energy-intensity calculations may be misleading. (Author)

  7. Flexibility in PPP contracts : Dealing with potential change in the pre-contract phase of a construction project

    NARCIS (Netherlands)

    Demirel, H.C.; Leendertse, W.L.; Volker, L.; Hertogh, M.J.C.M.

    2016-01-01

    Public Private Partnerships (PPPs) cover a range of possible relationships between public and private parties. PPP contracts are typically used in contexts of great uncertainty, such as large construction and infrastructure projects that are realized over a longer period of time. Hence, a major

  8. Instant noodles as an antifriction device: making the BOP with PPP in PNG.

    Science.gov (United States)

    Errington, Frederick; Fujikura, Tatsuro; Gewertz, Deborah

    2012-01-01

    Focusing primarily, but not exclusively, on urban and periurban Papua New Guinea (PNG), we discuss the significance of instant ramen noodles to those now known as the “bottom of the pyramid” (BOP). Although instant noodles are remarkable in that they are eaten by virtually everyone in the world, albeit in different amounts and for different reasons, they are marketed in PNG specifically as a “popularly positioned product” (PPP) for the BOP. Cheap, convenient, tasty, filling, and shelf stable, they are a modern addition to Sidney Mintz's classic “proletarian hunger killers” of sugar, tea, and coffee. But, we argue, instant noodles have a distinctive contemporary role: they do more than sustain the poor; they transform them into the aspiring consumers of the BOP. As such, instant noodles can be viewed as an antifriction device, greasing the skids of capitalism as it extends its reach.

  9. Multi-nucleon pion absorption in the 4He(π+,ppp)n reaction

    International Nuclear Information System (INIS)

    Weber, P.; McAlister, J.; Olszewski, R.; Feltham, A.; Hanna, M.; Johnson, R.R.; Pavan, M.; Ponting, C.; Rozon, F.M.; Sevior, M.; Sossi, V.; Vetterli, D.; Humphrey, D.; Lolos, G.J.; Papandreou, Z.; Tacik, R.; Ottewell, D.; Sheffer, G.; Smith, G.R.; Mardor, Y.; May-Tal, S.

    1990-08-01

    Three-proton emission cross sections for the 4 He(π + ,ppp)n reaction were measured at an incident pion kinetic energy of T pi + =165 MeV over a wide angular range in a kinematically complete experiment. Angular correlations, missing momentum distributions and energy spectra are compared with three- and four-body phase space Monte Carlo calculations. The results provide strong evidence that most of the three-proton coincidences result from three-nucleon absorption. From phase-space integration the total three-nucleon absorption cross section is estimated to be σ 3N =4.8 ± 1.0 mb. The cross section involving four nucleons is small and is estimated to be σ 4N 4 He, multi-nucleon pion absorption seems to represent only a small fraction. (Author) (40 refs., 3 tabs., 15 figs.)

  10. Multi-nucleon pion absorption in the 4He(π+, ppp)n reaction

    International Nuclear Information System (INIS)

    Weber, P.; McAlister, J.; Olszewski, R.; Feltham, A.; Hanna, M.; Johnson, R.R.; Pavan, M.; Ponting, C.; Rozon, F.M.; Sevior, M.; Sossi, V.; Vetterli, D.; Humphrey, D.; Lolos, G.J.; Papandreou, Z.; Mardor, Y.; May-Tal, S.; Ottewell, D.; Sheffer, G.; Smith, G.R.

    1989-01-01

    Three-proton emission cross sections for the 4 He(π + , ppp)n reaction were measured at Tsub(π + )=165 MeV over a wide angular range in a kinematically complete experiment. The momentum distribution of the undetected neutron and angular correlations have been compared with three- and four-body phase space Monte Carlo calculations. The results indicate that most of three-proton coincidences result from three nucleon absorption. The total three-nucleon absorption cross section is estimated to be σ 3N =4.5±1.0 mb from phase-space integration. This cross section does not account for the discrepancy between total absorption cross sections and two-nucleon absorption cross sections. (orig.)

  11. GPS receiver phase biases estimable in PPP-RTK networks: dynamic characterization and impact analysis

    Science.gov (United States)

    Zhang, Baocheng; Liu, Teng; Yuan, Yunbin

    2018-06-01

    The integer ambiguity resolution enabled precise point positioning (PPP-RTK) has been proven advantageous in a wide range of applications. The realization of PPP-RTK concerns the isolation of satellite phase biases (SPBs) and other corrections from a network of Global Positioning System (GPS) reference receivers. This is generally based on Kalman filter in order to achieve real-time capability, in which proper modeling of the dynamics of various types of unknowns remains crucial. This paper seeks to gain insight into how to reasonably deal with the dynamic behavior of the estimable receiver phase biases (RPBs). Using dual-frequency GPS data collected at six colocated receivers over days 50-120 of 2015, we analyze the 30-s epoch-by-epoch estimates of L1 and wide-lane (WL) RPBs for each receiver pair. The dynamics observed in these estimates are a combined effect of three factors, namely the random measurement noise, the multipath and the ambient temperature. The first factor can be overcome by turning to a real-time filter and the second by considering the use of a sidereal filtering. The third factor has an effect only on the WL, and this effect appears to be linear. After accounting for these three factors, the low-pass-filtered, sidereal-filtered, epoch-by-epoch estimates of L1 RPBs follow a random walk process, whereas those of WL RPBs are constant over time. Properly modeling the dynamics of RPBs is vital, as it ensures the best convergence of the Kalman-filtered, between-satellite single-differenced SPB estimates to their correct values and, in turn, shortens the time-to-first-fix at user side.

  12. GPS receiver phase biases estimable in PPP-RTK networks: dynamic characterization and impact analysis

    Science.gov (United States)

    Zhang, Baocheng; Liu, Teng; Yuan, Yunbin

    2017-11-01

    The integer ambiguity resolution enabled precise point positioning (PPP-RTK) has been proven advantageous in a wide range of applications. The realization of PPP-RTK concerns the isolation of satellite phase biases (SPBs) and other corrections from a network of Global Positioning System (GPS) reference receivers. This is generally based on Kalman filter in order to achieve real-time capability, in which proper modeling of the dynamics of various types of unknowns remains crucial. This paper seeks to gain insight into how to reasonably deal with the dynamic behavior of the estimable receiver phase biases (RPBs). Using dual-frequency GPS data collected at six colocated receivers over days 50-120 of 2015, we analyze the 30-s epoch-by-epoch estimates of L1 and wide-lane (WL) RPBs for each receiver pair. The dynamics observed in these estimates are a combined effect of three factors, namely the random measurement noise, the multipath and the ambient temperature. The first factor can be overcome by turning to a real-time filter and the second by considering the use of a sidereal filtering. The third factor has an effect only on the WL, and this effect appears to be linear. After accounting for these three factors, the low-pass-filtered, sidereal-filtered, epoch-by-epoch estimates of L1 RPBs follow a random walk process, whereas those of WL RPBs are constant over time. Properly modeling the dynamics of RPBs is vital, as it ensures the best convergence of the Kalman-filtered, between-satellite single-differenced SPB estimates to their correct values and, in turn, shortens the time-to-first-fix at user side.

  13. How well can online GPS PPP post-processing services be used to establish geodetic survey control networks?

    Science.gov (United States)

    Ebner, R.; Featherstone, W. E.

    2008-09-01

    Establishing geodetic control networks for subsequent surveys can be a costly business, even when using GPS. Multiple stations should be occupied simultaneously and post-processed with scientific software. However, the free availability of online GPS precise point positioning (PPP) post-processing services offer the opportunity to establish a whole geodetic control network with just one dual-frequency receiver and one field crew. To test this idea, we compared coordinates from a moderate-sized (~550 km by ~440 km) geodetic network of 46 points over part of south-western Western Australia, which were processed both with the Bernese v5 scientific software and with the CSRS (Canadian Spatial Reference System) PPP free online service. After rejection of five stations where the antenna type was not recognised by CSRS, the PPP solutions agreed on average with the Bernese solutions to 3.3 mm in east, 4.8 mm in north and 11.8 mm in height. The average standard deviations of the Bernese solutions were 1.0 mm in east, 1.2 mm in north and 6.2 mm in height, whereas for CSRS they were 3.9 mm in east, 1.9 mm in north and 7.8 mm in height, reflecting the inherently lower precision of PPP. However, at the 99% confidence level, only one CSRS solution was statistically different to the Bernese solution in the north component, due to a data interruption at that site. Nevertheless, PPP can still be used to establish geodetic survey control, albeit with a slightly lower quality because of the larger standard deviations. This approach may be of particular benefit in developing countries or remote regions, where geodetic infrastructure is sparse and would not normally be established without this approach.

  14. 40 CFR Table 1 to Subpart N of... - General Provisions Applicability to Subpart N

    Science.gov (United States)

    2010-07-01

    ... Subpart N 1 Table 1 to Subpart N of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Electroplating and Chromium Anodizing Tanks Pt. 63, Subpt. N, Table 1 Table 1 to Subpart N of Part 63—General Provisions Applicability to Subpart N General provisionsreference Applies to subpart N Comment 63.1(a)(1) Yes...

  15. 40 CFR Table 1 to Subpart W of... - General Provisions Applicability to Subpart W

    Science.gov (United States)

    2010-07-01

    ... Subpart W 1 Table 1 to Subpart W of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Polyamides Production Pt. 63, Subpt. W, Table 1 Table 1 to Subpart W of Part 63—General Provisions Applicability to Subpart W Reference Applies to subpart W BLR WSR WSR alternative standard, and BLR equipment...

  16. An Alternative Model to Determine the Financing Structure of PPP-Based Young Graduate Apartments in China: A Case Study of Hangzhou

    Directory of Open Access Journals (Sweden)

    Yelin Xu

    2015-05-01

    Full Text Available Public-private partnerships (PPP can be employed to provide public rental housing for young graduates, which has been urgent to achieve social sustainability in China. However, few studies have been conducted to investigate the financing structure of PPPs, particularly the ratio of private investment, which is important in initiating a PPP project. This study develops a robust model to determine the financing structure through considering the uncertainties in operation. A case study in Hangzhou demonstrates the process of the model. The relevant findings provide private investors and the local government with effective references for negotiating the financing structure of a PPP project.

  17. Variable Persister Gene Interactions with (pppGpp for Persister Formation in Escherichia coli

    Directory of Open Access Journals (Sweden)

    Shuang Liu

    2017-09-01

    Full Text Available Persisters comprise a group of phenotypically heterogeneous metabolically quiescent bacteria with multidrug tolerance and contribute to the recalcitrance of chronic infections. Although recent work has shown that toxin-antitoxin (TA system HipAB depends on stringent response effector (pppGppin persister formation, whether other persister pathways are also dependent on stringent response has not been explored. Here we examined the relationship of (pppGpp with 15 common persister genes (dnaK, clpB, rpoS, pspF, tnaA, sucB, ssrA, smpB, recA, umuD, uvrA, hipA, mqsR, relE, dinJ using Escherichia coli as a model. By comparing the persister levels of wild type with their single gene knockout and double knockout mutants with relA, we divided their interactions into five types, namely A “dependent” (dnaK, recA, B “positive reinforcement” (rpoS, pspF, ssrA, recA, C “antagonistic” (clpB, sucB, umuD, uvrA, hipA, mqsR, relE, dinJ, D “epistasis” (clpB, rpoS, tnaA, ssrA, smpB, hipA, and E “irrelevant” (dnaK, clpB, rpoS, tnaA, sucB, smpB, umuD, uvrA, hipA, mqsR, relE, dinJ. We found that the persister gene interactions are intimately dependent on bacterial culture age, cell concentrations (diluted versus undiluted culture, and drug classifications, where the same gene may belong to different groups with varying antibiotics, culture age or cell concentrations. Together, this study represents the first attempt to systematically characterize the intricate relationships among the different mechanisms of persistence and as such provide new insights into the complexity of the persistence phenomenon at the level of persister gene network interactions.

  18. Resolving Peak Ground Displacements in Real-Time GNSS PPP Solutions

    Science.gov (United States)

    Hodgkinson, K. M.; Mencin, D.; Mattioli, G. S.; Sievers, C.; Fox, O.

    2017-12-01

    The goal of early earthquake warning (EEW) systems is to provide warning of impending ground shaking to the public, infrastructure managers, and emergency responders. Shaking intensity can be estimated using Ground Motion Prediction Equations (GMPEs), but only if site characteristics, hypocentral distance and event magnitude are known. In recent years work has been done analyzing the first few seconds of the seismic P wave to derive event location and magnitude. While initial rupture locations seem to be sufficiently constrained, it has been shown that P-wave magnitude estimates tend to saturate at M>7. Regions where major and great earthquakes occur may therefore be vulnerable to an underestimation of shaking intensity if only P waves magnitudes are used. Crowell et al., (2013) first demonstrated that Peak Ground Displacement (PGD) from long-period surface waves recorded by GNSS receivers could provide a source-scaling relation that does not saturate with event magnitude. GNSS PGD derived magnitudes could improve the accuracy of EEW GMPE calculations. If such a source-scaling method were to be implemented in EEW algorithms it is critical that the noise levels in real-time GNSS processed time-series are low enough to resolve long-period surface waves. UNAVCO currently operates 770 real-time GNSS sites, most of which are located along the North American-Pacific Plate Boundary. In this study, we present an analysis of noise levels observed in the GNSS Precise Point Positioning (PPP) solutions generated and distributed in real-time by UNAVCO for periods from seconds to hours. The analysis is performed using the 770 sites in the real-time network and data collected through July 2017. We compare noise levels determined from various monument types and receiver-antenna configurations. This analysis gives a robust estimation of noise levels in PPP solutions because the solutions analyzed are those that were generated in real-time and thus contain all the problems observed

  19. 40 CFR Appendix A to Subpart Aa of... - Applicability of General Provisions (40 CFR Part 63, Subpart A) to Subpart AA

    Science.gov (United States)

    2010-07-01

    ... (40 CFR Part 63, Subpart A) to Subpart AA A Appendix A to Subpart AA of Part 63 Protection of... Hazardous Air Pollutants From Phosphoric Acid Manufacturing Plants Pt. 63, Subpt. AA, App. A Appendix A to Subpart AA of Part 63—Applicability of General Provisions (40 CFR Part 63, Subpart A) to Subpart AA 40 CFR...

  20. Pancreatitis, panniculitis, and polyarthritis (PPP) syndrome: MRI features of intraosseous fat necrosis involving the feet and knees

    International Nuclear Information System (INIS)

    Kang, Dong Joo; Lee, Sun Joo; Choo, Hye Jung; Her, Minyoung; Yoon, Hye Kyoung

    2017-01-01

    Pancreatitis, panniculitis, and polyarthritis (PPP) syndrome is extremely rare and presents as a triad of the three diseases. The patient usually presents with mild or absent abdominal symptoms. Here, we report on a case of a 66-year-old male who presented with pain and swelling in both legs and mild abdominal pain. He was diagnosed with acute pancreatitis by pancreatic enzyme analysis and abdominal computed tomography (CT) and with skin lesions of panniculitis through a biopsy. Magnetic resonance imaging (MRI) revealed multifocal intraosseous fat necrosis and arthritis involving both the feet and the knees. Therefore, we report a case of PPP syndrome with intraosseous fat necrosis involving both the feet and the knees. (orig.)

  1. Pancreatitis, panniculitis, and polyarthritis (PPP) syndrome: MRI features of intraosseous fat necrosis involving the feet and knees

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Dong Joo; Lee, Sun Joo; Choo, Hye Jung [Busan Paik Hospital, Department of Radiology, Inje University College of Medicine, Busan (Korea, Republic of); Her, Minyoung [Busan Paik Hospital, Division of Rheumatology, Department of Internal Medicine, Inje University College of Medicine, Busan (Korea, Republic of); Yoon, Hye Kyoung [Busan Paik Hospital, Department of Pathology, Inje University College of Medicine, Busan (Korea, Republic of)

    2017-02-15

    Pancreatitis, panniculitis, and polyarthritis (PPP) syndrome is extremely rare and presents as a triad of the three diseases. The patient usually presents with mild or absent abdominal symptoms. Here, we report on a case of a 66-year-old male who presented with pain and swelling in both legs and mild abdominal pain. He was diagnosed with acute pancreatitis by pancreatic enzyme analysis and abdominal computed tomography (CT) and with skin lesions of panniculitis through a biopsy. Magnetic resonance imaging (MRI) revealed multifocal intraosseous fat necrosis and arthritis involving both the feet and the knees. Therefore, we report a case of PPP syndrome with intraosseous fat necrosis involving both the feet and the knees. (orig.)

  2. Analysis of the dynamic behavior of structures using the high-rate GNSS-PPP method combined with a wavelet-neural model: Numerical simulation and experimental tests

    Science.gov (United States)

    Kaloop, Mosbeh R.; Yigit, Cemal O.; Hu, Jong W.

    2018-03-01

    Recently, the high rate global navigation satellite system-precise point positioning (GNSS-PPP) technique has been used to detect the dynamic behavior of structures. This study aimed to increase the accuracy of the extraction oscillation properties of structural movements based on the high-rate (10 Hz) GNSS-PPP monitoring technique. A developmental model based on the combination of wavelet package transformation (WPT) de-noising and neural network prediction (NN) was proposed to improve the dynamic behavior of structures for GNSS-PPP method. A complicated numerical simulation involving highly noisy data and 13 experimental cases with different loads were utilized to confirm the efficiency of the proposed model design and the monitoring technique in detecting the dynamic behavior of structures. The results revealed that, when combined with the proposed model, GNSS-PPP method can be used to accurately detect the dynamic behavior of engineering structures as an alternative to relative GNSS method.

  3. PPP mode’s applications motivation in the field of water conservancy project - based on the “money service” theory of Milton Friedman

    Science.gov (United States)

    Chen, Zurong; Feng, Jingchun; Wang, Yuting; Xue, Song

    2017-06-01

    We study on PPP mode’s applications motivation in the field of water conservancy project, on the basis of analyzing Friedman’s “money service” theory, for the disadvantages of traditional investment mode in water conservancy project field. By analyzing the way of government and social capital spending money in PPP projects, we get conclusion that both of which are the way of “spending their own money to do their own thing”, which fully reflects that the two sides are a win-win partnership in PPP mode. From the application motivation, PPP mode can not only compensate for the lack of local funds, improve the investment efficiency of the government, but also promote marketization and the supply-side structural reforms.

  4. Hepatic protein phosphatase 1 regulatory subunit 3B (Ppp1r3b) promotes hepatic glycogen synthesis and thereby regulates fasting energy homeostasis.

    Science.gov (United States)

    Mehta, Minal B; Shewale, Swapnil V; Sequeira, Raymond N; Millar, John S; Hand, Nicholas J; Rader, Daniel J

    2017-06-23

    Maintenance of whole-body glucose homeostasis is critical to glycemic function. Genetic variants mapping to chromosome 8p23.1 in genome-wide association studies have been linked to glycemic traits in humans. The gene of known function closest to the mapped region, PPP1R3B (protein phosphatase 1 regulatory subunit 3B), encodes a protein (G L ) that regulates glycogen metabolism in the liver. We therefore sought to test the hypothesis that hepatic PPP1R3B is associated with glycemic traits. We generated mice with either liver-specific deletion ( Ppp1r3b Δ hep ) or liver-specific overexpression of Ppp1r3b The Ppp1r3b deletion significantly reduced glycogen synthase protein abundance, and the remaining protein was predominantly phosphorylated and inactive. As a consequence, glucose incorporation into hepatic glycogen was significantly impaired, total hepatic glycogen content was substantially decreased, and mice lacking hepatic Ppp1r3b had lower fasting plasma glucose than controls. The concomitant loss of liver glycogen impaired whole-body glucose homeostasis and increased hepatic expression of glycolytic enzymes in Ppp1r3b Δ hep mice relative to controls in the postprandial state. Eight hours of fasting significantly increased the expression of two critical gluconeogenic enzymes, phosphoenolpyruvate carboxykinase and glucose-6-phosphatase, above the levels in control livers. Conversely, the liver-specific overexpression of Ppp1r3b enhanced hepatic glycogen storage above that of controls and, as a result, delayed the onset of fasting-induced hypoglycemia. Moreover, mice overexpressing hepatic Ppp1r3b upon long-term fasting (12-36 h) were protected from blood ketone-body accumulation, unlike control and Ppp1r3b Δ hep mice. These findings indicate a major role for Ppp1r3b in regulating hepatic glycogen stores and whole-body glucose/energy homeostasis. © 2017 by The American Society for Biochemistry and Molecular Biology, Inc.

  5. Contractual framework of private-public partnership: The sui generis nature of PPP as a result of the holistic approach

    OpenAIRE

    Cvetković Predrag

    2014-01-01

    The holistic (comprehensive] approach to the methodological framework for the analysis of public-private partnership is essential presumption for the transformation of the public and private interests from the conflicting ones to the parallel and convergent ones. Private and public interests are to be regarded not as the divided particulars but as the element of the dynamics of PPP as a whole. The holistic approach facilitates interaction which brings new 'added values' in the exercise of the...

  6. PPP and the real exchange rate-real interest rate differential puzzle revisited: evidence from non-stationary panel data

    OpenAIRE

    Georgios E. Chortareas; Rebecca L. Driver

    2001-01-01

    This paper examines the evidence for two of the relationships that underpin (explicitly or implicitly) much of international macroeconomics. The first is purchasing power parity (PPP), or the hypothesis that there exists a constant long-run equilibrium real exchange rate. The second establishes a relationship between real exchange rates and real interest rate differentials. The tests are conducted on a panel of 18 OECD economies using the United States as a numeraire for the post-Bretton Wood...

  7. 基于UML的PPP项目融资管理信息系统的分析%Analysis of PPP Project Financing Management Information System Based on UML

    Institute of Scientific and Technical Information of China (English)

    郭卫萍; 何楠

    2012-01-01

    PPP项目融资过程中,为便于各主体之间以及主体与外部环境之间信息的流通与传递,实现PPP项目融资过程中的信息化管理,运用UML可视化建模语言对PPP项目融资管理信息系统进行功能分析,创建用例图、类图和顺序图等,从而为后期开发PPP项目融资管理信息系统奠定基础。%In the process of PPP project financing, in order to facilitate the circulation and transmission of information between the main bodies and between the subject and external environment, and realize the process of information management of the PPP project fi- nancing, this paper uses the visualized modeling language UML throughout the whole process of the design of the PPP project financing management information system, and introduces the concept and features of PPP financing model and the related concepts of UML mod- eling firstly, then analyses the function of the PPP project financing management information system, and finally, analyses PPP project financing management information system with the UML modeling. It creates the use case diagram, the class diagram and the sequence diagram for the PPP project financing management information system. Thus it lays foundation for the later development of PPP project financing management information system.

  8. Performance analysis of PPP ambiguity resolution with UPD products estimated from different scales of reference station networks

    Science.gov (United States)

    Wang, Siyao; Li, Bofeng; Li, Xingxing; Zang, Nan

    2018-01-01

    Integer ambiguity fixing with uncalibrated phase delay (UPD) products can significantly shorten the initialization time and improve the accuracy of precise point positioning (PPP). Since the tracking arcs of satellites and the behavior of atmospheric biases can be very different for the reference networks with different scales, the qualities of corresponding UPD products may be also various. The purpose of this paper is to comparatively investigate the influence of different scales of reference station networks on UPD estimation and user ambiguity resolution. Three reference station networks with global, wide-area and local scales are used to compute the UPD products and analyze their impact on the PPP-AR. The time-to-first-fix, the unfix rate and the incorrect fix rate of PPP-AR are analyzed. Moreover, in order to further shorten the convergence time for obtaining precise positioning, a modified partial ambiguity resolution (PAR) and corresponding validation strategy are presented. In this PAR method, the ambiguity subset is determined by removing the ambiguity one by one in the order of ascending elevations. Besides, for static positioning mode, a coordinate validation strategy is employed to enhance the reliability of the fixed coordinate. The experiment results show that UPD products computed by smaller station network are more accurate and lead to a better coordinate solution; the PAR method used in this paper can shorten the convergence time and the coordinate validation strategy can improve the availability of high precision positioning.

  9. HPLC-based quantification of bacterial housekeeping nucleotides and alarmone messengers ppGpp and pppGpp.

    Science.gov (United States)

    Varik, Vallo; Oliveira, Sofia Raquel Alves; Hauryliuk, Vasili; Tenson, Tanel

    2017-09-08

    Here we describe an HPLC-based method to quantify bacterial housekeeping nucleotides and the signaling messengers ppGpp and pppGpp. We have replicated and tested several previously reported HPLC-based approaches and assembled a method that can process 50 samples in three days, thus making kinetically resolved experiments feasible. The method combines cell harvesting by rapid filtration, followed by acid extraction, freeze-drying with chromatographic separation. We use a combination of C18 IPRP-HPLC (GMP unresolved and co-migrating with IMP; GDP and GTP; AMP, ADP and ATP; CTP; UTP) and SAX-HPLC in isocratic mode (ppGpp and pppGpp) with UV detection. The approach is applicable to bacteria without the requirement of metabolic labelling with 32P-labelled radioactive precursors. We applied our method to quantify nucleotide pools in Escherichia coli BW25113 K12-strain both throughout the growth curve and during acute stringent response induced by mupirocin. While ppGpp and pppGpp levels vary drastically (40- and ≥8-fold, respectively) these changes are decoupled from the quotients of the housekeeping pool and guanosine and adenosine housekeeping nucleotides: NTP/NDP/NMP ratio remains stable at 6/1/0.3 during both normal batch culture growth and upon acute amino acid starvation.

  10. Exploring Factors Affecting Implementation of Public Private Partnership Housing Projects in Bauchi State, Nigeria

    Directory of Open Access Journals (Sweden)

    Mohammed Sani

    2018-03-01

    Full Text Available Public Private Partnership (PPP Housing scheme in Nigeria is intended to complement government effort toward increasing housing stock and providing affordable housing in the country. However, Bauchi state government adopted the construction of 5,000 phases PPP Housing. But 6 years after the commencement of the scheme, only a few numbers of housing units were completed and commissioned. Therefore, it becomes imperative to carry out research on the impact level of those factors affecting the implementation of the scheme. The aim of the study is to investigate impact level of factors affecting the implementation of PPP housing projects in Bauchi state with a view to find out possible ways that will improve the implementation of the scheme. The descriptive and explorative research design was adopted for this study. 54 structured Questionnaires were administered to construction professional’s staff under private housing developers and relevant government agencies in Bauchi state. 42 valid Questionnaires were retrieved and analysed with SPSS software. The result of the quantitative data analysis shows that creation of favourable investment environment and government support have very high Impact on the implementation of Bauchi PPP housing projects. Therefore, this study recommends that government and other stakeholders should give more attention to the creation of favourable investment environment, support in policy formulation and managerial strategies in the future for improving the implementation of PPP housing projects.

  11. Contractual framework of private-public partnership: The sui generis nature of PPP as a result of the holistic approach

    Directory of Open Access Journals (Sweden)

    Cvetković Predrag

    2014-01-01

    Full Text Available The holistic (comprehensive] approach to the methodological framework for the analysis of public-private partnership is essential presumption for the transformation of the public and private interests from the conflicting ones to the parallel and convergent ones. Private and public interests are to be regarded not as the divided particulars but as the element of the dynamics of PPP as a whole. The holistic approach facilitates interaction which brings new 'added values' in the exercise of the public interest by using the PPP construction: economic, social and political. This concept allows the PPP to 'take the best of both worlds' (the protection of the public interest and solidarity from the public sector, and the entrepreneurial logic from the private sector]. In light of the sui generis structure of mutual relations between the public and the private partner in the PPP framework, the contractual basis of public-private partnership has the character of relational contracts. Relational contracts differ from traditional contracting mechanisms. The parties to traditional contracts have equal information at their disposal, which enables them to define ex ante the terms of the transaction insofar as the consequences of performance or non-performance are anticipated at the time of contract conclusion. On the other hand, relational contracts are incomplete agreements: the parties to relational contracts mutually agree that it is impossible or economically inefficient to define ex ante the possible difficulties and circumstances of the transaction at issue (which is possible in classical contracts]. In this respect, in relational contracts the rationale for commitment is relatively flexible. The public-private partnership agreement is a relational contract. Relational contracts within the PPP framework limit the opportunistic behaviour on both parties and promote the development of their co-operation and exchange of information. Relational contracts

  12. National Contingency Plan Subpart J

    Science.gov (United States)

    Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.

  13. Decomposition into Tradables and Nontradables and the Purchasing Power Parity (PPP Hypothesis of the Real Won-dollar Exchange Rate

    Directory of Open Access Journals (Sweden)

    Deockhyun Ryu

    2011-09-01

    Full Text Available The purpose of this paper is to test the purchasing power parity (PPP hypothesis using the won-dollar real exchange rate and analyze the effect of the decomposition into tradables and non-tradables on the change of the won-dollar real exchange rate. This paper decomposes the CPI-based real exchange rate into two parts according to Engel (1999; one is the relative price of traded goods between the countries, the other is a component that is a weighted difference of the relative price of nontraded-to traded-goods prices in each country. We construct this by comparing the component subsection weights in CPI. The empirical analysis of this paper consists of two parts as follows. First, we conducted a traditional time series analyses of the real exchange rate, tradable and non-tradable parts respectively, thereby testing the PPP hypothesis and other important hypotheses. Secondly, this paper conducted a Mean Squared Error (MSE analysis to evaluate the relative contribution of tradable and non-tradable parts to the change of real exchange rate. From the time series analysis, it is not guaranteed that the PPP hyThe purpose of this paper is to test the purchasing power parity (PPP hypothesis using the won-dollar real exchange rate and analyze the effect of the decomposition into tradables and non-tradables on the change of the won-dollar real exchange rate. This paper decomposes the CPI-based real exchange rate into two parts according to Engel (1999; one is the relative price of traded goods between the countries, the other is a component that is a weighted difference of the relative price of nontraded-to traded-goods prices in each country. We construct this by comparing the component subsection weights in CPI. The empirical analysis of this paper consists of two parts as follows. First, we conducted a traditional time series analyses of the real exchange rate, tradable and non-tradable parts respectively, thereby testing the PPP hypothesis and other

  14. 40 CFR Table 17 to Subpart Xxxx of... - Applicability of General Provisions to This Subpart XXXX

    Science.gov (United States)

    2010-07-01

    ... This Subpart XXXX 17 Table 17 to Subpart XXXX of Part 63 Protection of Environment ENVIRONMENTAL... Manufacturing Pt. 63, Subpt. XXXX, Table 17 Table 17 to Subpart XXXX of Part 63—Applicability of General Provisions to This Subpart XXXX As stated in § 63.6013, you must comply with the applicable General...

  15. 40 CFR Table 1 to Subpart R of... - General Provisions Applicability to Subpart R

    Science.gov (United States)

    2010-07-01

    ... Subpart R 1 Table 1 to Subpart R of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Pipeline Breakout Stations) Pt. 63, Subpt. R, Table 1 Table 1 to Subpart R of Part 63—General Provisions Applicability to Subpart R Reference Applies to subpart R Comment 63.1(a)(1) Yes 63.1(a)(2) Yes 63.1(a)(3) Yes...

  16. 40 CFR 63.11505 - What parts of my plant does this subpart cover?

    Science.gov (United States)

    2010-07-01

    ... polishing metal HAP, as defined in § 63.11511, “What definitions apply to this subpart?” (3) Each dry... commenced construction or reconstruction of the affected source on or before March 14, 2008. (c) An affected source is new if you commenced construction or reconstruction of the affected source after March 14, 2008...

  17. Research on the application of PPP model in the Chinese construction and operation of new energy vehicle charging facilities

    Science.gov (United States)

    Zhu, Liping

    2017-05-01

    New energy car charging equipment is the development and popularization of new energy vehicles. It has the nature of quasi-public goods. Due to the large number of construction projects, wide distribution, big investment, it needs huge sums of money. PPP mode is a new financing model and has the inherent driving force to lead the idea the technology and the system innovation. The government and the social subject cooperate on the basis of the spirit of contract thus achieve benefit sharing. This mode effectively improve the operation of new energy vehicle charging facilities operating efficiency

  18. Near real-time PPP-based monitoring of the ionosphere using dual-frequency GPS/BDS/Galileo data

    Science.gov (United States)

    Liu, Zhinmin; Li, Yangyang; Li, Fei; Guo, Jinyun

    2018-03-01

    Ionosphere delay is very important to GNSS observations, since it is one of the main error sources which have to be mitigated even eliminated in order to determine reliable and precise positions. The ionosphere is a dispersive medium to radio signal, so the value of the group delay or phase advance of GNSS radio signal depends on the signal frequency. Ground-based GNSS stations have been used for ionosphere monitoring and modeling for a long time. In this paper we will introduce a novel approach suitable for single-receiver operation based on the precise point positioning (PPP) technique. One of the main characteristic is that only carrier-phase observations are used to avoid particular effects of pseudorange observations. The technique consists of introducing ionosphere ambiguity parameters obtained from PPP filter into the geometry-free combination of observations to estimate ionospheric delays. Observational data from stations that are capable of tracking the GPS/BDS/GALILEO from the International GNSS Service (IGS) Multi-GNSS Experiments (MGEX) network are processed. For the purpose of performance validation, ionospheric delays series derived from the novel approach are compared with the global ionospheric map (GIM) from Ionospheric Associate Analysis Centers (IAACs). The results are encouraging and offer potential solutions to the near real-time ionosphere monitoring.

  19. 40 CFR Table 1 to Subpart Hhhhhh... - Applicability of General Provisions to Subpart HHHHHH of Part 63

    Science.gov (United States)

    2010-07-01

    ... Subpart HHHHHH of Part 63 1 Table 1 to Subpart HHHHHH of Part 63 Protection of Environment ENVIRONMENTAL... 1 to Subpart HHHHHH of Part 63—Applicability of General Provisions to Subpart HHHHHH of Part 63 Citation Subject Applicable to subpart HHHHHH Explanation § 63.1(a)(1)-(12) General Applicability Yes § 63...

  20. 48 CFR 239.7100 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Security and Privacy for Computer Systems 239.7100 Scope of subpart. This subpart includes information assurance and... protection of privacy of individuals (see FAR Subpart 24.1). ...

  1. Smad4-dependent suppressor pituitary homeobox 2 promotes PPP2R2A-mediated inhibition of Akt pathway in pancreatic cancer.

    Science.gov (United States)

    Wang, Qi; Li, Juanjuan; Wu, Wei; Shen, Ruizhe; Jiang, He; Qian, Yuting; Tang, Yanping; Bai, Tingting; Wu, Sheng; Wei, Lumin; Zang, Yi; Zhang, Ji; Wang, Lifu

    2016-03-08

    The importance of Pituitary homeobox 2 (Pitx2) in malignancy remains enigmatic, and Pitx2 has not been previously implicated in pancreatic ductal adenocarcinoma (PDAC). In this study, we performed gene expression profiling of human PDAC tissues and identified Pitx2 as a promising candidate. Pitx2 expression was decreased from 2.6- to 19-fold in human PDAC tissues from microarray units. Immunochemistry staining showed that Pitx2 expression was moderate to intense in normal pancreatic and pancreatic intraepithelial neoplastic lesions, whereas low in human PDAC tissues. The Pitx2 levels correlated with overall patient survival post-operatively in PDAC. Induction of Pitx2 expression partly inhibited the malignant phenotype of PDAC cells. Interestingly, low Pitx2 expression was correlated with Smad4 mutant inactivation, but not with Pitx2 DNA-methylation. Furthermore, Smad4 protein bound to Pitx2 promoter and stimulated Pitx2 expression in PDAC. In addition, Pitx2 protein bound to the promoter of the protein phosphatase 2A regulatory subunit B55α (PPP2R2A) and upregulated PPP2R2A expression, which may activate dephosphorylation of Akt in PDAC. These findings provide new mechanistic insights into Pitx2 as a tumor suppressor in the downstream of Smad4. And Pitx2 protein promotes PPP2R2A expression which may inhibit Akt pathway. Therefore, we propose that the Smad4-Pitx2-PPP2R2A axis, a new signaling pathway, suppresses the pancreatic carcinogenesis.

  2. Re-exploration of Definition,Connotation and Characteristics of PPP%PPP的定义、内涵与特征再认识

    Institute of Scientific and Technical Information of China (English)

    郑传军; 徐芬; 成虎

    2016-01-01

    Based on the latest definitions from international organizations and government agencies,this paper conducts a systemic summary and induction of PPP’s definition,connotation and characteristics in this research with domestic PPP policies. Through the above research,concludes that public goods and services,public sector,private sector and partnerships are the core connotations of PPP,and risk and benefit sharing,long-term cooperation,projectfinancing,life cycle cost and encouraging innovation are prominent characteristics of PPP. Thus,these conclusions will supply references for comprehensive understanding and application in PPP practice.%基于国际组织和政府机构关于PPP的最新定义并结合我国的PPP政策,对其定义、内涵和特征进行系统总结和归纳,认为公共产品及服务、公共部门、私营部门和伙伴关系是PPP的核心内涵,风险分担、利益共享、长期合作、项目融资、全寿命周期成本和激励创新是PPP的突出特征,可为PPP的全面理解和推广应用提供参考。

  3. An Alternative Model to Determine the Financing Structure of PPP-Based Young Graduate Apartments in China : A Case Study of Hangzhou

    NARCIS (Netherlands)

    Xu, Y.; Peng, Y.; Qian, K.; Chan, A.P.C.

    2015-01-01

    Public-private partnerships (PPP) can be employed to provide public rental housing for young graduates, which has been urgent to achieve social sustainability in China. However, few studies have been conducted to investigate the financing structure of PPPs, particularly the ratio of private

  4. Effects of PPP1R1B (DARPP-32 Polymorphism on Feedback-related Brain Potentials across the Life Span

    Directory of Open Access Journals (Sweden)

    Dorothea eHämmerer

    2013-03-01

    Full Text Available Maximizing gains during probabilistic reinforcement learning requires the updating of choice–outcome expectations at the time when the feedback about a specific choice or action is given. Extant theories and evidence suggest that dopaminergic modulation plays a crucial role in reinforcement learning and the updating of choice–outcome expectations. Furthermore, recently a positive component of the event-related potential (ERP about 200 msec (P2 after feedback has been suggested to reflect such updating. The efficacy of dopaminergic modulation changes across the life span. However, to date investigations of age-related differences in feedback-related P2 during reinforcement learning are still scarce. The present study thus aims to investigate whether individual differences in the feedback-related P2 would be associated with polymorphic variations in a dopamine relevant gene PPP1R1B (also known as DARPP-32 and whether the genetic effect may differ between age groups. We observed larger P2 amplitudes in individuals carrying the genotype associated with higher dopamine receptor efficacy, i.e., A allele homozygotes of a single nucleotide polymorphism (rs907094 of the PPP1R1B gene. Moreover, this effect was more pronounced in children and older adults in comparison to adolescents and younger adults. Together, our findings indicate that polymorphic variations in a dopamine relevant gene are associated with individual differences in brain-evoked potentials of outcome updating and hint at the possibility that genotype effects on neurocognitive phenotypes may vary as a function of brain maturation and aging.

  5. 40 CFR Table 2 to Subpart Dd of... - Applicability of Paragraphs in Subpart A of This Part 63-General Provisions to Subpart DD

    Science.gov (United States)

    2010-07-01

    ... A of This Part 63-General Provisions to Subpart DD 2 Table 2 to Subpart DD of Part 63 Protection of... Hazardous Air Pollutants from Off-Site Waste and Recovery Operations Pt. 63, Subpt. DD, Table 2 Table 2 to Subpart DD of Part 63—Applicability of Paragraphs in Subpart A of This Part 63—General Provisions to...

  6. On the estimability of parameters in undifferenced, uncombined GNSS network and PPP-RTK user models by means of $mathcal {S}$ S -system theory

    Science.gov (United States)

    Odijk, Dennis; Zhang, Baocheng; Khodabandeh, Amir; Odolinski, Robert; Teunissen, Peter J. G.

    2016-01-01

    The concept of integer ambiguity resolution-enabled Precise Point Positioning (PPP-RTK) relies on appropriate network information for the parameters that are common between the single-receiver user that applies and the network that provides this information. Most of the current methods for PPP-RTK are based on forming the ionosphere-free combination using dual-frequency Global Navigation Satellite System (GNSS) observations. These methods are therefore restrictive in the light of the development of new multi-frequency GNSS constellations, as well as from the point of view that the PPP-RTK user requires ionospheric corrections to obtain integer ambiguity resolution results based on short observation time spans. The method for PPP-RTK that is presented in this article does not have above limitations as it is based on the undifferenced, uncombined GNSS observation equations, thereby keeping all parameters in the model. Working with the undifferenced observation equations implies that the models are rank-deficient; not all parameters are unbiasedly estimable, but only combinations of them. By application of S-system theory the model is made of full rank by constraining a minimum set of parameters, or S-basis. The choice of this S-basis determines the estimability and the interpretation of the parameters that are transmitted to the PPP-RTK users. As this choice is not unique, one has to be very careful when comparing network solutions in different S-systems; in that case the S-transformation, which is provided by the S-system method, should be used to make the comparison. Knowing the estimability and interpretation of the parameters estimated by the network is shown to be crucial for a correct interpretation of the estimable PPP-RTK user parameters, among others the essential ambiguity parameters, which have the integer property which is clearly following from the interpretation of satellite phase biases from the network. The flexibility of the S-system method is

  7. Association of the PPP3CA c.249G>A variant with clinical outcomes of tacrolimus-based therapy in kidney transplant recipients

    Directory of Open Access Journals (Sweden)

    Salgado PC

    2017-03-01

    Full Text Available Patricia C Salgado,1 Fabiana DV Genvigir,1 Claudia R Felipe,2 Helio Tedesco-Silva Jr,2 Jose O Medina-Pestana,2 Sonia Q Doi,3 Mario H Hirata,1 Rosario DC Hirata1 1Department of Clinical and Toxicological Analysis, School of Pharmaceutical Sciences, University of Sao Paulo, 2Division of Nephrology, Hospital do Rim, Federal University of Sao Paulo, Sao Paulo, Brazil; 3School of Medicine, Uniformed Services University of the Health Sciences, Bethesda, MD, USA Background: The effects of genetic variants related to the pharmacodynamic mechanisms of immunosuppressive drugs on their therapeutic efficacy and safety have been poorly explored. This study was performed to investigate the influence of the PPP3CA c.249G>A variant on the clinical outcomes of kidney transplant recipients. Patients and methods: A total of 148 Brazilian patients received tacrolimus (TAC-based immunosuppressive therapy for 90 days post-kidney transplantation. The PPP3CA rs3730251 (c.249G>A polymorphism was determined by real-time polymerase chain reaction. Single-nucleotide polymorphism (SNP data for CYP3A5 rs776746 (CYP3A5*3C; g.6986A>G were used to eliminate the confounding effects of this variant. Results: The PPP3CA c.249G>A SNP did not influence early TAC exposure, renal function, or other laboratory parameters, including levels of urea, creatinine, glucose, and lipids, and blood counts. This variant also did not account for the cumulative incidence of biopsy-confirmed acute rejection or delayed graft function. Regarding adverse events, PPP3CA c.249A allele carriers initially had a 3.05-fold increased probability of treatment-induced blood and lymphatic system disorders compared with c.249GG genotype individuals (95% confidence interval: 1.10–8.48, p=0.032. However, this result was not maintained after adjusting for body weight and CYP3A5*3C SNP status (p=0.086. Conclusion: The PPP3CA c.249G>A variant does not influence the clinical outcomes of Brazilian patients in the

  8. 10 CFR 2.1200 - Scope of subpart L.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart L. 2.1200 Section 2.1200 Energy NUCLEAR... Hearing Procedures for NRC Adjudications § 2.1200 Scope of subpart L. The provisions of this subpart... and request the application of Subpart L procedures, and proceedings for the direct or indirect...

  9. 40 CFR Table 1 to Subpart Xxxxxx... - Description of Source Categories Affected by This Subpart

    Science.gov (United States)

    2010-07-01

    ... heating units, combination gas-oil burners, oil or gas swimming pool heaters, heating apparatus (except... supplies industry sector of this source category includes establishments primarily engaged in high energy...), coke and gas burning salamanders, liquid or gas solar energy collectors, solar heaters, space heaters...

  10. The recurrent PPP1CB mutation p.Pro49Arg in an additional Noonan-like syndrome individual: Broadening the clinical phenotype.

    Science.gov (United States)

    Bertola, Débora; Yamamoto, Guilherme; Buscarilli, Michelle; Jorge, Alexander; Passos-Bueno, Maria Rita; Kim, Chong

    2017-03-01

    We report on a 12-year-old Brazilian boy with the p.Pro49Arg mutation in PPP1CB, a novel gene associated with RASopathies. This is the fifth individual described, and the fourth presenting the same variant, suggesting a mutational hotspot. Phenotypically, he also showed the same hair pattern-sparse, thin, and with slow growing-, similar to the typical ectodermal finding observed in Noonan syndrome-like disorder with loose anagen hair. Additionally, he presented craniosynostosis, a rare clinical finding in RASopathies. This report gives further support that this novel RASopathy-PPP1CB-related Noonan syndrome with loose anagen hair-shares great similarity to Noonan syndrome-like disorder with loose anagen hair, and expands the phenotypic spectrum by adding the cranial vault abnormality. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  11. Research on the Approach to Realize Sustainability of PPP Infrastructure Project from the Perspective of Partnership%伙伴关系视角的 PPP 基础设施项目可持续性实现途径研究

    Institute of Scientific and Technical Information of China (English)

    叶晓甦; 邓云

    2014-01-01

    PPP 项目伙伴关系为分析视角,展开基础设施项目可持续性实质的特征分析,提出公共部门、私人部门和社会公众三个利益主体之间保持目标一致性、合作长期性、平等协调性、利益风险共享四个伙伴关系特征,以此构建 PPP 基础设施项目可持续性的实现途径。%The paper,from the perspective of PPP partnership,analyzes the substantive feature of sustainability of infra-structure projects,then proposes that the public sector,the private sector and the society should maintain characteristics of consistent targets,long - term cooperation,fair coordination,mutual benefit and risk sharing. Finally,the approach to a-chieve the sustainability of PPP infrastructure project is established.

  12. Rethinking the Evaluation Method and Procurement Process for Public Private Partnerships Infrastructures:Lessons Learnt from International Practices%基础设施 PPP 项目评价与立项决策的再思考--基于 PPP 模式的国际实践经验

    Institute of Scientific and Technical Information of China (English)

    刘勇; 肖翥; 许叶林

    2015-01-01

    This paper summarizes the VFM evaluation methods and procurement procedures adopted in UK,Hong Kong and Singapore,identifies and analyzes the pitfalls of evaluation method and procurement procedure employed in China,and finally proposes suggestions for the establishment of VFMevaluation method and procurement procedure suitable for China’ s specific circumstance.It is believed that the study results obtained would provide practitioners with management implica-tions and benefit the success of PPP projects.%在归纳总结公共部门 VFM评价与 PPP 项目立项决策国际主流模式的基础上,分析我国现行基础设施建设PPP 项目评价与立项决策过程中存在的问题,并结合国情提出构建我国基础设施建设 PPP 项目评价与立项决策体系的建议。

  13. Ex-ante evaluation of PFIs within the Italian health-care sector: what is the basis for this PPP?

    Science.gov (United States)

    Barretta, Antonio; Ruggiero, Pasquale

    2008-10-01

    This paper aims to explore the practices of ex-ante evaluation in the Italian health-care sector (HCS) in order to verify whether (and how), in spite of legislative requirements, public interests are also considered before choosing the PFI solution, and to understand the possible effects of the pre-evaluation method used on the expectations of the public partner regarding the future of the relationship. The research was carried out by interviewing the subjects responsible for six initiatives of project financing in the Italian health-care sector. The empirical analysis has shown that Italian health-care trusts, which are not required to apply a compulsory method for pre-evaluating PFIs from their own perspective, neither drew up any calculation for weighting their future costs and revenues related to the project, nor did they consider the social consequences for the community. However, they merely followed the legal requirements and prepared a financial plan from the private partner perspective. In this situation, the importance of ex-ante evaluation from the public perspective for guaranteeing the beginning of a PPP in a context more suitable for developing trust between partners is even stronger.

  14. Patterning and gastrulation defects caused by the tw18 lethal are due to loss of Ppp2r1a

    Directory of Open Access Journals (Sweden)

    Lisette Lange

    2017-06-01

    Full Text Available The mouse t haplotype, a variant 20 cM genomic region on Chromosome 17, harbors 16 embryonic control genes identified by recessive lethal mutations isolated from wild mouse populations. Due to technical constraints so far only one of these, the tw5 lethal, has been cloned and molecularly characterized. Here we report the molecular isolation of the tw18 lethal. Embryos carrying the tw18 lethal die from major gastrulation defects commencing with primitive streak formation at E6.5. We have used transcriptome and marker gene analyses to describe the molecular etiology of the tw18 phenotype. We show that both WNT and Nodal signal transduction are impaired in the mutant epiblast, causing embryonic patterning defects and failure of primitive streak and mesoderm formation. By using a candidate gene approach, gene knockout by homologous recombination and genetic rescue, we have identified the gene causing the tw18 phenotype as Ppp2r1a, encoding the PP2A scaffolding subunit PR65alpha. Our work highlights the importance of phosphatase 2A in embryonic patterning, primitive streak formation, gastrulation, and mesoderm formation downstream of WNT and Nodal signaling.

  15. 40 CFR Table 2 to Subpart Xx of... - Requirements of 40 CFR Part 61, Subpart FF, Not Included in the Requirements for This Subpart and...

    Science.gov (United States)

    2010-07-01

    ... Subpart XX of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Operations Pt. 63, Subpt. XX, Table 2 Table 2 to Subpart XX of Part 63—Requirements of 40 CFR Part 61...

  16. 7 CFR 760.7 - Other requirements for affected farmers.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Other requirements for affected farmers. 760.7 Section... Payments to Dairy Farmers for Milk § 760.7 Other requirements for affected farmers. An indemnity payment for milk may be made under this subpart to an affected farmer only under the following conditions: (a...

  17. 29 CFR Appendix A to Subpart Q of... - References to subpart Q of Part 1926

    Science.gov (United States)

    2010-07-01

    ... ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Concrete and Masonry Construction Pt. 1926, Subpt. Q, App. A Appendix A to Subpart Q of Part 1926—References to subpart.... • Accident Prevention Manual for Industrial Operations; Eighth Edition; National Safety Council. • Building...

  18. 18 CFR Appendix B to Subpart H of... - Appendix B to Subpart H of Part 35

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Appendix B to Subpart H of Part 35 B Appendix B to Subpart H of Part 35 Conservation of Power and Water Resources FEDERAL... SCHEDULES AND TARIFFS Wholesale Sales of Electric Energy, Capacity and Ancillary Services at Market-Based...

  19. 18 CFR Appendix A to Subpart H of... - Appendix A to Subpart H of Part 35

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Appendix A to Subpart H of Part 35 A Appendix A to Subpart H of Part 35 Conservation of Power and Water Resources FEDERAL... SCHEDULES AND TARIFFS Wholesale Sales of Electric Energy, Capacity and Ancillary Services at Market-Based...

  20. 14 CFR 1204.400 - Scope of subpart.

    Science.gov (United States)

    2010-01-01

    ... Business Policy § 1204.400 Scope of subpart. This subpart establishes NASA's small business policy and outlines the delegation of authority in implementing this policy as required by Federal law. ...

  1. 48 CFR 7.400 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION PLANNING Equipment Lease or Purchase 7.400 Scope of subpart. This subpart provides guidance pertaining to the decision to acquire equipment by lease or purchase. It applies to both the initial...

  2. 45 CFR 63.16 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... OFFICE OF THE ASSISTANT SECRETARY FOR PLANNING AND EVALUATION Financial Provisions § 63.16 Scope of subpart. This subpart sets forth supplemental financial provisions which apply to all grants awarded by...

  3. 48 CFR 750.7100 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Extraordinary Contractual Actions To Protect Foreign Policy Interests of the United States 750.7100 Scope of subpart. This subpart sets forth the standards and the...

  4. 48 CFR 4.500 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... MATTERS Electronic Commerce in Contracting 4.500 Scope of subpart. This subpart provides policy and procedures for the establishment and use of electronic commerce in Federal acquisition as required by Section...

  5. A novel rasopathy caused by recurrent de novo missense mutations in PPP1CB closely resembles Noonan syndrome with loose anagen hair.

    Science.gov (United States)

    Gripp, Karen W; Aldinger, Kimberly A; Bennett, James T; Baker, Laura; Tusi, Jessica; Powell-Hamilton, Nina; Stabley, Deborah; Sol-Church, Katia; Timms, Andrew E; Dobyns, William B

    2016-09-01

    Noonan syndrome is a rasopathy caused by mutations in multiple genes encoding components of the RAS/MAPK pathway. Despite its variable phenotype, limited genotype-phenotype correlations exist. Noonan syndrome with loose anagen hair (NS-LAH) is characterized by its distinctive hair anomalies, developmental differences, and structural brain abnormalities and is caused by a single recurrent missense SHOC2 mutation. SHOC2 forms a complex with protein phosphatase 1 (PP1C). Protein phosphatases counterbalance kinases and control activation of signaling proteins, such as the mitogen-activated protein kinases of the RAS/MAPK pathway. Here we report four patients with de novo missense mutations in protein phosphatase one catalytic subunit beta (PPP1CB), sharing a recognizable phenotype. Three individuals had the recurrent PPP1CB c.146G>C, p.Pro49Arg mutation, the fourth had a c.166G>C, p.Ala56Pro change. All had relative or absolute macrocephaly, low-set and posteriorly angulated ears, and developmental delay. Slow growing and/or sparse hair and/or an unruly hair texture was present in all. Three individuals had feeding difficulties requiring feeding tubes. One of two males had cryptorchidism, another had pectus excavatum. Short stature was present in three. A female with the recurrent mutation had a Dandy-Walker malformation and optic nerve hypoplasia. Mild ventriculomegaly occurred in all, cerebellar tonsillar ectopia was seen in two and progressed to Chiari 1 malformation in one individual. Based on the combination of phenotypic findings and PPP1CB's effect on RAF dephosphorylation within the RAS/MAPK pathway, this novel condition can be considered a rasopathy, most similar to NS-LAH. Collectively, these mutations meet the standardized criteria for pathogenicity. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  6. The role of the Public Private Partnership (PPP) in Cross Border Cooperation (CBC) as strategic practice in the EU Policies and cooperation tools for 2014-2020

    OpenAIRE

    Lussi, Manoela

    2014-01-01

    2012/2013 There is an increasingly widespread acknowledgement among all active actors in the development co-operation sector that the Public Private Partnership (PPP) can be a new important tool, not only to build important infrastructure (public works) but also to provide services to the citizens at central and local level as well as to have a strategic value in the Cross-Border Co-operation (CBC) in the next future. The European Commission defines PPPs in a rather broad and general wa...

  7. 10 CFR 2.1000 - Scope of subpart J.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart J. 2.1000 Section 2.1000 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures... Geologic Repository § 2.1000 Scope of subpart J. The rules in this subpart, together with the rules in...

  8. 48 CFR 504.500 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Scope of subpart. 504.500 Section 504.500 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION GENERAL ADMINISTRATIVE MATTERS Electronic Commerce in Contracting 504.500 Scope of subpart. This subpart provides policy and procedure for use of GSA's Electronic...

  9. 12 CFR 516.100 - What does this subpart do?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What does this subpart do? 516.100 Section 516.100 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY APPLICATION PROCESSING PROCEDURES Comment Procedures § 516.100 What does this subpart do? This subpart contains the procedures...

  10. 12 CFR 516.160 - What does this subpart do?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What does this subpart do? 516.160 Section 516.160 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY APPLICATION PROCESSING PROCEDURES Meeting Procedures § 516.160 What does this subpart do? This subpart contains meeting procedures...

  11. 41 CFR 101-39.4900 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ...-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.49-Forms § 101-39.4900 Scope of subpart. This subpart provides the... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of subpart. 101-39.4900 Section 101-39.4900 Public Contracts and Property Management Federal Property Management...

  12. 29 CFR 1926.155 - Definitions applicable to this subpart.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Definitions applicable to this subpart. 1926.155 Section... § 1926.155 Definitions applicable to this subpart. (a) Approved, for the purpose of this subpart, means... any of the following hydrocarbons, or mixtures of them, such as propane, propylene, butane (normal...

  13. 33 CFR 148.300 - What does this subpart concern?

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false What does this subpart concern... (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: GENERAL Licenses § 148.300 What does this subpart concern? This subpart concerns the license for a deepwater port and the procedures for transferring, amending...

  14. 10 CFR 63.302 - Definitions for Subpart L.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Definitions for Subpart L. 63.302 Section 63.302 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC... Definitions for Subpart L. All definitions in subpart K of this part, and the following: Accessible...

  15. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    Fig 1: Map of study area showing major towns used in the present study. Analysis for microbial quality. The most .... interaction involving the dissolution of plagioclase and other .... such as sanitary waste from human and animal sewage or from ...

  16. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    predisposes Cameroon female type 2 diabetes mellitus patients to essential hypertension. Research Article ..... related to age and sex, diabetics of different ages were grouped into ... older than normotensive T2DM patients. (p<0.05). This is ...

  17. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    based on the fact that the disease is endemic and therefore has a basic ... by the deterministic equations will coincide with the mean values from a ..... The stochastic model should account for the basic events of recruitment (infection) and.

  18. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    poverty alleviation strategies can provide clues in facing the challenges encountered in ... in socio-economic infrastructure and social capital but challenges persist in implementing decentralization policies ..... happening to inequality?

  19. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    Résumé. Les modèles de propagation sont des outils essentiels pour la planification et l'optimisation radio dans les réseaux mobiles. Le présent article présente une étude comparative de cinq méthodes d'optimisation de modèles de propagation à savoir : La régression linéaire, la méthode de Newton de second ordre, le.

  20. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    2015-07-15

    Jul 15, 2015 ... for accessing healthcare or treatment; it no longer ... before the more complex and more expensive ones. ... wealth and affluence coexist with abject poverty, a world in which .... VANHIVAX by the scientific community, despite.

  1. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    shows that only two schools of higher learning in the country teach AVT and that, 42 studies so far have been carried ..... English and French as official languages, alongside. 286 national ..... The government should create or activate an AVT.

  2. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    des échantillons d'eau issus des différentes sources respectives afin de comparer la qualité de l'eau à la source ..... Figure 2: Piper's diagram showing the various water types of all the water samples sampled. ..... Information on Phosphorus.

  3. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    shows that only two schools of higher learning in the country teach AVT and that, ... new media house named the 'Cameroon Radio .... two translator-training schools: The Advanced .... to highlight the role played by gestures made in a.

  4. 12 Layout ppp2

    African Journals Online (AJOL)

    Nubidga

    (Cameroon Economic, Social and Finance Report,. 2011). In 2010 and ... financial capital profitability indexes to show that ..... fundamental notion that time series data are always stationary ... corporate merchandise trade and services and so.

  5. Affects and Affect Consciousness

    Science.gov (United States)

    MONSEN, JON T.; EILERTSEN, DAG ERIK; MELGÅRD, TROND; ØDEGÅRD, PÅL

    1996-01-01

    Affect consciousness (AC) was operationalized as degrees of awareness, tolerance, nonverbal expression, and conceptual expression of nine specific affects. A semistructured interview (ACI) and separate scales were developed to assess these aspects of affect integration. Their psychometric properties were preliminarily explored by having 20 former psychiatric outpatients complete the interview. Concurrent validity was assessed by using DSM-III-R Axis I and II diagnoses, the Health-Sickness Rating Scale, SCL-90-R, and several indexes from the Minnesota Multiphasic Personality Inventory. Satisfactory interrater reliability and high levels of internal consistency supported the construct validity of the measure. Results suggest the most meaningful use of this instrument is in measuring specific affect and overall AC. Clinically, the ACI has provided highly specific and relevant qualitative data for use in planning psychotherapeutic interventions. PMID:22700292

  6. The practice exploration of PPP mode in urban energy saving lighting projects%城市节能照明项目PPP模式的实践探索

    Institute of Scientific and Technical Information of China (English)

    丘毅辉

    2016-01-01

    The paper illustrates the definition of government and social capital cooperation mode method and the way of the top design of the urban energy saving lighting projects. By reforming cases in some city to carry out the PPP lighting, it explains the op⁃eration method and the matters needing attention of PPP mode, at the same time it introduces the risk of the laws, government credit, finance, project construction and cooperation and response mea⁃sures existed in the process of project implementation.%阐述了政府和社会资本合作方式模式的定义和在城市节能照明项目的顶层设计方式。通过在某市开展PPP照明改造案例,说明PPP模式的操作方法和注意事项,同时介绍了项目实施过程中存在的法律、政府信用、金融、项目建设和合作方面的风险以及应对措施。

  7. 40 CFR Table 1 to Subpart Wwwww of... - Applicability of General Provisions to Subpart WWWWW

    Science.gov (United States)

    2010-07-01

    ... operating permits for purposes of being subject to this subpart. § 63.1(c)(3)-(4) [Reserved] § 63.1(c)(5) Subject to notification requirements No § 63.1(d) [Reserved] § 63.1(e) Emission limitation by permit Yes... requirements Yes § 63.6(b)(6) [Reserved] § 63.6(c)(1) Compliance dates for existing sources Yes Subpart WWWWW...

  8. 30 CFR 206.100 - What is the purpose of this subpart?

    Science.gov (United States)

    2010-07-01

    ... for the lessee's oil by applying the rules in this subpart to your disposition of the lessee's oil. (c... in this subpart to the lessee's disposition of its oil. (d) If the regulations in this subpart are... MANAGEMENT PRODUCT VALUATION Federal Oil § 206.100 What is the purpose of this subpart? (a) This subpart...

  9. Multi-GNSS high-rate RTK, PPP and novel direct phase observation processing method: application to precise dynamic displacement detection

    Science.gov (United States)

    Paziewski, Jacek; Sieradzki, Rafal; Baryla, Radoslaw

    2018-03-01

    This paper provides the methodology and performance assessment of multi-GNSS signal processing for the detection of small-scale high-rate dynamic displacements. For this purpose, we used methods of relative (RTK) and absolute positioning (PPP), and a novel direct signal processing approach. The first two methods are recognized as providing accurate information on position in many navigation and surveying applications. The latter is an innovative method for dynamic displacement determination with the use of GNSS phase signal processing. This method is based on the developed functional model with parametrized epoch-wise topocentric relative coordinates derived from filtered GNSS observations. Current regular kinematic PPP positioning, as well as medium/long range RTK, may not offer coordinate estimates with subcentimeter precision. Thus, extended processing strategies of absolute and relative GNSS positioning have been developed and applied for displacement detection. The study also aimed to comparatively analyze the developed methods as well as to analyze the impact of combined GPS and BDS processing and the dependence of the results of the relative methods on the baseline length. All the methods were implemented with in-house developed software allowing for high-rate precise GNSS positioning and signal processing. The phase and pseudorange observations collected with a rate of 50 Hz during the field test served as the experiment’s data set. The displacements at the rover station were triggered in the horizontal plane using a device which was designed and constructed to ensure a periodic motion of GNSS antenna with an amplitude of ~3 cm and a frequency of ~4.5 Hz. Finally, a medium range RTK, PPP, and direct phase observation processing method demonstrated the capability of providing reliable and consistent results with the precision of the determined dynamic displacements at the millimeter level. Specifically, the research shows that the standard deviation of

  10. Operating subsidies for urban rail transit PPP projects%城市轨道交通PPP项目运营补贴测算

    Institute of Scientific and Technical Information of China (English)

    张智慧; 张剑寒

    2016-01-01

    城市轨道交通(urban rail transit,URT,简称城轨)所具有的准经营性和准公共物品属性决定了政府和社会资本合作(public-private partnership,PPP)开发城轨项目具有一定的合理性.该文对采用PPP模式开发城轨项目进行分析,探讨开发城轨项目产生的外部效益与政府补贴之间的关系.在此基础上,参考政府指导性文件的要求,提出了城轨项目年度运营补贴的计算模型,对2012年北京地铁4号线政府运营补贴支出数额进行了测算;同时采用“有无对比法”,以2012年北京地铁4号线为例,对其外部效益进行了测算.结果表明:2012年北京地铁4号线政府运营补贴支出数额明显低于该项目同年各项外部效益之和,说明该项目的政府运营补贴合理.%The basic features of urban rail transit (URT) such as the shared operational responsibilities and the partial public ownership determine the public-private partnership (PPP) mode for developing URT projects.In this paper,the use of the PPP mode to develop URT projects is analyzed to study the relationship between the external benefits and government subsidies on the URT.Government regulations were used to develop a model for URT annual operating subsidies that was used to predict the government operating subsidies for Beijing subway line 4 in 2012.Then,the “with and without methods” were used to analyze Beijing subway line 4 in 2012 to determine the external benefits of this project.The results show that the government operating subsidies for Beijing subway line 4 in 2012 were significantly lower than the external benefits and that the government operating subsidies for this project are reasonable.

  11. Using Compliance Analysis for PPP to bridge the gap between SEA and EIA: Lessons from the Turcot Interchange reconstruction in Montréal, Québec

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Undiné-Celeste, E-mail: undine_t@hotmail.com; Marsan, Jean-François, E-mail: jfmarsan@hotmail.com; Fournier-Peyresblanques, Bastien, E-mail: bastien.fp@gmail.com; Forgues, Chantal, E-mail: chantal_forgues@hotmail.com; Ogaa, Anita, E-mail: aogaa1@gmail.com; Jaeger, Jochen A.G., E-mail: jochen.jaeger@concordia.ca

    2013-09-15

    There is increasing concern about the disjunct between the intent of higher level government goals and actual projects “on the ground” in Canada. Although strategic environmental assessment (SEA) and a wide variety of plans, policies and programmes (PPP) contain and promote goals that envision a movement towards social, economic and environmental sustainability, these goals are not necessarily upheld by large-scale projects and their environmental impact assessments (EIAs). This disconnect is often illustrated through anecdotal observations. However, to be able to overcome this disjunct it is imperative to come to a clearer understanding of the degree of sustainability or unsustainability of large-scale developments and the way in which they “measure up” in terms of the goals when compared to alternative options. This article proposes a Compliance Analysis method for investigating the level of harmonization between SEA, PPP and proposed projects and their possible alternatives (CAPPP). This method is quantified through a Likert scale which allows for comparison of alternatives for decision making and analytical purposes. The 2009 proposal for the Turcot Exchange redevelopment in Montréal, Québec, put forward by the Ministry of Transport of Québec (MTQ), as well as two alternative proposals, were utilized as a case study to clearly demonstrate the CAPPP methodology and its applicability. The approved plan for the Turcot redevelopment proposed by MTQ was found to be in poor compliance with the majority of the 178 goals in the six sectors that were examined (air quality, climate change, health, noise, socioeconomic, transport), while alternative proposals were found to be in greater accordance with the intentions of governmental SEA and PPP. Synthesis and applications: The CAPPP methodology is a versatile “watchdog” tool for the examination of the level of compliance between stated goals for regions, industrial sectors, or governments and the EIAs of

  12. Using Compliance Analysis for PPP to bridge the gap between SEA and EIA: Lessons from the Turcot Interchange reconstruction in Montréal, Québec

    International Nuclear Information System (INIS)

    Thompson, Undiné-Celeste; Marsan, Jean-François; Fournier-Peyresblanques, Bastien; Forgues, Chantal; Ogaa, Anita; Jaeger, Jochen A.G.

    2013-01-01

    There is increasing concern about the disjunct between the intent of higher level government goals and actual projects “on the ground” in Canada. Although strategic environmental assessment (SEA) and a wide variety of plans, policies and programmes (PPP) contain and promote goals that envision a movement towards social, economic and environmental sustainability, these goals are not necessarily upheld by large-scale projects and their environmental impact assessments (EIAs). This disconnect is often illustrated through anecdotal observations. However, to be able to overcome this disjunct it is imperative to come to a clearer understanding of the degree of sustainability or unsustainability of large-scale developments and the way in which they “measure up” in terms of the goals when compared to alternative options. This article proposes a Compliance Analysis method for investigating the level of harmonization between SEA, PPP and proposed projects and their possible alternatives (CAPPP). This method is quantified through a Likert scale which allows for comparison of alternatives for decision making and analytical purposes. The 2009 proposal for the Turcot Exchange redevelopment in Montréal, Québec, put forward by the Ministry of Transport of Québec (MTQ), as well as two alternative proposals, were utilized as a case study to clearly demonstrate the CAPPP methodology and its applicability. The approved plan for the Turcot redevelopment proposed by MTQ was found to be in poor compliance with the majority of the 178 goals in the six sectors that were examined (air quality, climate change, health, noise, socioeconomic, transport), while alternative proposals were found to be in greater accordance with the intentions of governmental SEA and PPP. Synthesis and applications: The CAPPP methodology is a versatile “watchdog” tool for the examination of the level of compliance between stated goals for regions, industrial sectors, or governments and the EIAs of

  13. 29 CFR Appendix B to Subpart B of... - Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for Determination of Coast Guard...

    Science.gov (United States)

    2010-07-01

    ... Subpart B, for Determination of Coast Guard Authorized Persons B Appendix B to Subpart B of Part 1915... Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment Pt. 1915, Subpt. B, App. B Appendix B to Subpart B of Part 1915—Reprint of U.S. Coast Guard Regulations Referenced in Subpart B, for...

  14. Research on Indemnificatory Apartments Based on PPP Financing Mode in China%中国保障性安居工程PPP融资模式研究

    Institute of Scientific and Technical Information of China (English)

    谢恒; 汤永鸿; 单海鹏

    2015-01-01

    Indemnificatory Apartments project is the housing security measures provided by government for the low-income families and housing difficulties families.PPP ( public -private -partnership ) is a new financing model, designed to guide social capital to participate in the development, construction and operation of the public projects.In Indemnificatory Apartments project especially construction of the low-rent housing and public rental housing , PPP can help the government reduce financial burden and management cost .And it can bring us efficient use of the social capital , organic combination between government goals and social capital business goals, high im-provement of the social economic benefit and high service level of the Indemnificatory Apartments construction.%保障性安居工程是中国政府针对城市低收入家庭和住房困难家庭出台的住房保障措施。政府和社会资本合作( Public-Private-Partnership,PPP)是一种新型融资模式,旨在引导和利用社会资本参与政府投资的公共项目的开发、建设和运营。在保障性安居工程尤其是廉租房、公租房建设中引入PPP,可以帮助政府减轻财政负担、降低管理成本,同时可使社会资本获得更高效地利用,达到政府公共目标和社会资本商业目标的有机结合,提高保障性安居工程建设的社会经济效益和服务水平。

  15. PPP:应对经济增速下滑的有效举措%On PPP as an Effective Measure against Slowing of Growth Rate

    Institute of Scientific and Technical Information of China (English)

    张淑翠; 许正中

    2015-01-01

    Under the construction financing needing forced in the city, China need to crack the “financing bottleneck”, and prevention and control debt risk, and governance overcapacity, and response to climate change, achieve the strategic objectives of capital growth, promote transformation, structural adjustment, benefits people and stability, China need powerful new starting point——Public Private Partnership(PPP).This is because that PPP is the coupler of pushing the government to cooperate with market, and can guard against collapse “Tacitus” trap, and build an international center of allocation resources, and promote the integration of public and private capital chain, and casting comprehensive service platform to support industry development, thereby contributing to the sustainable development of the country.%在城市化建设融资需求倒逼下,中国要破解“融资瓶颈”,防控债务风险,治理产能过剩,应对气候变化,实现保增长、促转型、调结构、惠民生、保稳定的战略目标,亟需强有力的抓手——公私化合作(简称PPP)模式。PPP是推动政府与市场合作的耦合器,可以谨防塌陷“塔西佗”陷阱,打造国际资源配置中心,促进公私资金链条一体化,铸造全面支撑产业发展服务平台,从而促进国家可持续发展。

  16. 10 CFR 2.700 - Scope of subpart G.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart G. 2.700 Section 2.700 Energy NUCLEAR... Formal Adjudications § 2.700 Scope of subpart G. The provisions of this subpart apply to and supplement... authorization for high-level radioactive waste repository noticed under §§ 2.101(f)(8) or 2.105(a)(5...

  17. 40 CFR 63.5780 - What is the purpose of this subpart?

    Science.gov (United States)

    2010-07-01

    ... Standards for Hazardous Air Pollutants: Reinforced Plastic Composites Production What This Subpart Covers... for hazardous air pollutants (NESHAP) for reinforced plastic composites production. This subpart also...

  18. 40 CFR 63.8266 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-07-01

    ... data acquisition and availability requirements of this subpart, used to sample, condition (if... operating limit) or work practice standard in this subpart during startup, shutdown, or malfunction...

  19. 31 CFR 363.9 - What does this subpart cover?

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false What does this subpart cover? 363.9 Section 363.9 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL... cover? This subpart provides general rules governing securities held within the TreasuryDirect ® system...

  20. 25 CFR 900.110 - What does this subpart cover?

    Science.gov (United States)

    2010-04-01

    ... management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this... Construction § 900.110 What does this subpart cover? (a) This subpart establishes requirements for issuing...

  1. 20 CFR 408.1000 - What is this subpart about?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What is this subpart about? 408.1000 Section 408.1000 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SPECIAL BENEFITS FOR CERTAIN WORLD WAR II... Determinations § 408.1000 What is this subpart about? (a) Explanation of the administrative review process. This...

  2. 40 CFR 60.1000 - What does this subpart do?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What does this subpart do? 60.1000 Section 60.1000 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Modification or Reconstruction is Commenced After June 6, 2001 Introduction § 60.1000 What does this subpart do...

  3. 40 CFR Table 1 to Subpart Nnnnnn... - HAP Emissions Sources

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 14 2010-07-01 2010-07-01 false HAP Emissions Sources 1 Table 1 to Subpart NNNNNN of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...: Chromium Compounds Pt. 63, Subpt. NNNNNN, Table 1 Table 1 to Subpart NNNNNN of Part 63—HAP Emissions...

  4. 7 CFR Exhibit A to Subpart Jj of... - Agreement Form

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Agreement Form A Exhibit A to Subpart JJ of Part 2045...) ADMINISTRATIVE REGULATIONS GENERAL Rural Development-Utilization of Gratuitous Services Pt. 2045, Subpt. JJ, Exh. A Exhibit A to Subpart JJ of Part 2045—Agreement Form for utilization of employees of (official...

  5. 27 CFR 73.10 - What does subpart B cover?

    Science.gov (United States)

    2010-04-01

    ...? 73.10 Section 73.10 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY (CONTINUED) PROCEDURES AND PRACTICES ELECTRONIC SIGNATURES; ELECTRONIC SUBMISSION OF FORMS Electronic Signatures § 73.10 What does subpart B cover? This subpart provides the...

  6. 27 CFR 73.30 - What does subpart C cover?

    Science.gov (United States)

    2010-04-01

    ...? 73.30 Section 73.30 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY (CONTINUED) PROCEDURES AND PRACTICES ELECTRONIC SIGNATURES; ELECTRONIC SUBMISSION OF FORMS Electronic Filing of Documents with TTB § 73.30 What does subpart C cover? This subpart...

  7. 7 CFR Exhibit A to Subpart B of... - [Reserved

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false [Reserved] A Exhibit A to Subpart B of Part 1900 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... REGULATIONS GENERAL Adverse Decisions and Administrative Appeals Exhibit A to Subpart B of Part 1900 [Reserved] ...

  8. 22 CFR 226.80 - Scope of subpart.

    Science.gov (United States)

    2010-04-01

    ... Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Additional Provisions For Awards to Commercial Organizations § 226.80 Scope of subpart. This subpart contains additional provisions that apply to awards to commercial organizations. These provisions...

  9. 40 CFR 86.1405 - Introduction; structure of subpart.

    Science.gov (United States)

    2010-07-01

    ...-Duty Trucks; Certification Short Test Procedures § 86.1405 Introduction; structure of subpart. (a) This... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Introduction; structure of subpart. 86.1405 Section 86.1405 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...

  10. 16 CFR Figure 2 to Subpart A of... - Test Frame

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test Frame 2 Figure 2 to Subpart A of Part 1201 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS... Subpart A of Part 1201—Test Frame EC03OC91.005 ...

  11. 31 CFR Appendix A to Subpart C of... - Examples

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Examples A Appendix A to Subpart C of... A to Subpart C of Part 29—Examples This appendix contains sample calculations of Federal Benefit Payments in a variety of situations. Optional Retirement Examples Example 1: No Unused Sick Leave A. In...

  12. 40 CFR Table 3 of Subpart Bbbbbbb... - Test Methods

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 14 2010-07-01 2010-07-01 false Test Methods 3 Table 3 of Subpart... 3 Table 3 of Subpart BBBBBBB of Part 63—Test Methods For * * * You must use * * * 1. Selecting the sampling locations a and the number of traverse points EPA test method 1 or 1A in appendix A to part 60. 2...

  13. 40 CFR Table 3 of Subpart Aaaaaaa... - Test Methods

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 14 2010-07-01 2010-07-01 false Test Methods 3 Table 3 of Subpart..., Subpt. AAAAAAA, Table 3 Table 3 of Subpart AAAAAAA of Part 63—Test Methods For * * * You must use * * * 1. Selecting the sampling locations a and the number of traverse points EPA test method 1 or 1A in...

  14. 28 CFR 32.31 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Scope of subpart. 32.31 Section 32.31 Judicial Administration DEPARTMENT OF JUSTICE PUBLIC SAFETY OFFICERS' DEATH, DISABILITY, AND EDUCATIONAL ASSISTANCE BENEFIT CLAIMS Educational Assistance Benefit Claims § 32.31 Scope of subpart. Consistent with...

  15. 10 CFR 63.303 - Implementation of Subpart L.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Implementation of Subpart L. 63.303 Section 63.303 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC... Implementation of Subpart L. (a) Compliance is based upon the arithmetic mean of the projected doses from DOE's...

  16. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Science.gov (United States)

    2010-07-01

    ...)-(3) Alternative Standard Procedures for getting an alternative standard. Yes. § 63.6(h)(1)-(9... subpart SSSSS § 63.1 Applicability Yes. § 63.2 Definitions Yes. § 63.3 Units and Abbreviations Yes. § 63.4 Prohibited Activities Compliance date; circumvention, severability Yes. § 63.5 Construction/Reconstruction...

  17. 40 CFR Table 7 to Subpart Ppppp of... - Applicability of General Provisions to Subpart PPPPP

    Science.gov (United States)

    2010-07-01

    ..., inspection Yes. § 63.6(g)(1)-(3) Alternative Standard Procedures for getting an alternative standard Yes... Applies to subpart PPPPP § 63.1(a)(1) Applicability General applicability of the General Provisions Yes. Additional terms defined in § 63.9375. § 63.1(a)(2)-(4) Applicability Applicability of source categories Yes...

  18. 40 CFR Table 9 to Subpart U of... - Routine Reports Required by This Subpart

    Science.gov (United States)

    2010-07-01

    ...)(ii) Requests for Approval of a Nominal Control Efficiency for Use in Emissions Averaging Initial... determination. a There may be two versions of this report due at different times; one for equipment subject to § 63.502 and one for other emission points subject to this subpart. b There will be two versions of...

  19. 30 CFR Appendix II to Subpart D of... - Appendix II to Subpart D of Part 18

    Science.gov (United States)

    2010-07-01

    ... LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Machines Assembled With Certified or Explosion-Proof Components, Field Modifications of Approved Machines, and Permits To Use Experimental Equipment Pt. 18, Subpt. D, App. II Appendix II to Subpart D of...

  20. 40 CFR 60.4305 - Does this subpart apply to my stationary combustion turbine?

    Science.gov (United States)

    2010-07-01

    ... turbine. Any additional heat input to associated heat recovery steam generators (HRSG) or duct burners... subpart are exempt from the requirements of subpart GG of this part. Heat recovery steam generators and duct burners regulated under this subpart are exempted from the requirements of subparts Da, Db, and Dc...

  1. 城市轨道交通工程公私合作融资项目风险分析与管理%Risk Analysis and Management on PPP Project of Urban Mass Transit Financing Mode

    Institute of Scientific and Technical Information of China (English)

    盛雪艳; 王建波

    2011-01-01

    公私合作(PPP)模式有效解决了政府部门在轨道交通建设方面资金不足的问题,但因其组织结构复杂、时间跨度长、牵扯面广而使潜在风险巨大.对PPP项目融资过程中的风险进行了分析,对其如何分担、管理进行了阐述.通过分析风险管理的概念、过程和框架,以及相应的风险防范与管理对策,为PPP模式在城市轨道交通中的应用提供有益的帮助.%PPP is a new project co-operation model, an effective solution to the government departments which ofter racer of insufficient funds in mass transit construction. However, because of the complexity, long time-span and wide range of the organizational structure, the potential risks are great. Therefore, the study on PPP model risks in project financing as well as their distribution and management is extremely important. This article analyzes the risks involved in project finance, then explaines how to share and manage the risks. By analyzing the concept of risk management, processe and framework, the corresponding prevention and management measures, this paper provides a useful reference for the application of PPP model in urban rail transit.

  2. APLICAÇÃO DA TÉCNICA PPP PARA A OBTENÇÃO DO POSICIONAMENTO NA CABOTAGEM NO BRASIL: ESTUDO DE CASO

    Directory of Open Access Journals (Sweden)

    Flávio Guilherme Vaz de Almeida Filho

    Full Text Available Este artigo apresenta uma metodologia de instrumentação e processamento de dados GPS para a obtenção de posicionamento preciso para cabotagem no Brasil. Para isso, um navio porta contêineres foi equipado com um par de receptores GPS (L1/L2 para o rastreio das observáveis no trajeto Santos (SP - Suape (PE; e seu pós-processamento por Posicionamento por Ponto Preciso (PPP cinemático. A precisão obtida foi ~23,1 cm. Desprezando os primeiros 60 minutos de rastreio a precisão foi de 8,0 cm. O coeficiente de correlação nas direções dos receptores foi de R²=0,922. Assim, foi possível obter dados precisos sobre a trajetória da embarcação, sua velocidade, aceleração, deriva e amplitude das inclinações. Esta instrumentação é uma etapa de um projeto que visa minimizar as emissões de gases causadores do efeito estufa (GEE no transporte intermodal de cargas. As informações precisas da dinâmica da embarcação poderão servir como parâmetros de ajuste em modelos de emissão existentes

  3. El modelo del partenariado aplicado a la lucha contra el cambio climático (Public private partnership (PPP as a model to work on climate change

    Directory of Open Access Journals (Sweden)

    Virginia Senosiain Ortega

    2012-06-01

    Full Text Available The present paper is focused on how the model of Public Private Partnership (PPP fits into the work against climate change and to promote sustainable development. Even If our main idea to study the importance of this model as a tool to protect the environment, is necessary to approach to the problem of climate change first; the proper characteristics of the problem will determinate its suitability. We will follow analyzing the special character of this model and some international good practices, to finish with the conclusions of the present studyEl presente estudio tiene como objeto la posible adecuación del modelo del partenariado público privado a la lucha contra el cambio climático y al desarrollo sostenible. Dado que nos centraremos en la aplicación de esta figura de colaboración en la protección del medio ambiente, entendemos necesario realizar una sucinta aproximación a la problemática del cambio climático, al ser sus propias características las que determinen la idoneidad o no del modelo del partenariado en este campo. Posteriormente analizaremos la especial naturaleza del partenariado en el ámbito medioambiental, para proseguir analizando sendos ejemplos de buenas prácticas internacionales, y concluir valorando los resultados del presente estudio.DOWNLOAD THIS PAPER FROM SSRN: http://ssrn.com/abstract=2009396

  4. Research on the Mechanism of Science and Technology Infrastructure Resource Sharing Service Based on PPP (Public-Private Partnership) Mode Selection: Taking Chongqing as an Example%基于PPP(公私合作)视角的科技资源共享服务机制研究——以重庆为例的分析

    Institute of Scientific and Technical Information of China (English)

    曾琼; 张小波

    2017-01-01

    The study found that the root cause of the problems of the existing sharing service management lies in the failure to properly deal with the contradiction between the dual value attributes of public goods and private goodsof science and technology resource.Accordingly,based on the dual value attributesof science and technology infrastructure resource and national policies to encourage social capital to involve in public services,taking Chongqing as a case study,the thesisputs forward the suggestions includingconstructing the management model of sharing service of science and technology infrastructure resourcebased on PPP (public-private partnership) perspective,and setting up the cost-benefit distribution mechanism,coordination management mechanism,resource integration mechanism,reward mechanism,incentive and constraint mechanism and corresponding system to ensure the successful operation of this model.%研究发现,现有科技资源共享服务管理出现问题的根源在于未正确处理好科技资源“公共品”和“私人品”的双重价值属性矛盾.基于此,以重庆为例,充分考虑科技基础资源双重价值属性,结合国家鼓励社会资本参与科研基础设施社会化服务的政策要求,从PPP(公私合作)的视角,构建科技资源共享服务管理模式,建立保证该模式成功运行的成本收益分配机制、协调管理机制、资源整合机制、回报机制、激励与约束机制和相应制度.

  5. 40 CFR 33.301 - What does this subpart require?

    Science.gov (United States)

    2010-07-01

    ... AGENCY PROGRAMS Good Faith Efforts § 33.301 What does this subpart require? A recipient, including one... good faith efforts whenever procuring construction, equipment, services and supplies under an EPA...

  6. 29 CFR Appendix A to Subpart S of... - Decompression Tables

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Underground Construction, Caissons, Cofferdams and Compressed Air Pt. 1926, Subpt. S, App. A Appendix A to Subpart S of Part 1926...

  7. 48 CFR 1819.7301 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ...&D, thereby increasing competition, productivity and economic growth. Federal agencies participating... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) Programs 1819.7301 Scope of subpart. The Small Business Innovation Research (SBIR...

  8. 20 CFR 1001.100 - Purpose and scope of subpart.

    Science.gov (United States)

    2010-04-01

    ... system established pursuant to the Wagner-Peyser Act, as amended. (b) This subpart describes the roles... performance standards for determining compliance of State agencies in carrying out the provisions of 38 U.S.C...

  9. 48 CFR 22.300 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... contracts that may require or involve laborers or mechanics. In this subpart, the term laborers or mechanics... perform services in connection with dredging or rock excavation in rivers or harbors, but does not include...

  10. "helix Nebula - the Science Cloud", a European Science Driven Cross-Domain Initiative Implemented in via AN Active Ppp Set-Up

    Science.gov (United States)

    Lengert, W.; Mondon, E.; Bégin, M. E.; Ferrer, M.; Vallois, F.; DelaMar, J.

    2015-12-01

    Helix Nebula, a European science cross-domain initiative building on an active PPP, is aiming to implement the concept of an open science commons[1] while using a cloud hybrid model[2] as the proposed implementation solution. This approach allows leveraging and merging of complementary data intensive Earth Science disciplines (e.g. instrumentation[3] and modeling), without introducing significant changes in the contributors' operational set-up. Considering the seamless integration with life-science (e.g. EMBL), scientific exploitation of meteorological, climate, and Earth Observation data and models open an enormous potential for new big data science. The work of Helix Nebula has shown that is it feasible to interoperate publicly funded infrastructures, such as EGI [5] and GEANT [6], with commercial cloud services. Such hybrid systems are in the interest of the existing users of publicly funded infrastructures and funding agencies because they will provide "freedom and choice" over the type of computing resources to be consumed and the manner in which they can be obtained. But to offer such freedom and choice across a spectrum of suppliers, various issues such as intellectual property, legal responsibility, service quality agreements and related issues need to be addressed. Finding solutions to these issues is one of the goals of the Helix Nebula initiative. [1] http://www.egi.eu/news-and-media/publications/OpenScienceCommons_v3.pdf [2] http://www.helix-nebula.eu/events/towards-the-european-open-science-cloud [3] e.g. https://sentinel.esa.int/web/sentinel/sentinel-data-access [5] http://www.egi.eu/ [6] http://www.geant.net/

  11. 25 CFR 1000.350 - What is the purpose of this subpart?

    Science.gov (United States)

    2010-04-01

    ... EDUCATION ACT Trust Evaluation Review § 1000.350 What is the purpose of this subpart? This subpart describes how the trust responsibility of the United States is legally maintained through a system of trust...

  12. 40 CFR 267.170 - Does this subpart apply to me?

    Science.gov (United States)

    2010-07-01

    ... PERMIT Use and Management of Containers § 267.170 Does this subpart apply to me? This subpart applies to you if you own or operate a facility that treats or stores hazardous waste in containers under a 40...

  13. 40 CFR 266.210 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-07-01

    ..., Transportation and Disposal. Terms § 266.210 What definitions apply to this subpart? This subpart uses the... waste in accordance with 40 CFR 261.3, “Definition of Hazardous Waste.” Land Disposal Restriction (LDR...

  14. 2 CFR 182.110 - What do subparts A through F of this part do?

    Science.gov (United States)

    2010-01-01

    ... FOR GRANTS AND AGREEMENTS Reserved GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage § 182.110 What do subparts A through F of this part do? Subparts A through F...

  15. 20 CFR 655.300 - Purpose and scope of subparts D and E.

    Science.gov (United States)

    2010-04-01

    ... Aliens as Registered Nurses § 655.300 Purpose and scope of subparts D and E. (a) Purpose. The Immigration... crisis. Subpart D of this part sets forth the procedure by which health care facilities seeking to use...

  16. PPP医疗项目关键成功因素分析%Analysis on the critical success factors in Public-Private Partnership (PPP) health projects in China

    Institute of Scientific and Technical Information of China (English)

    陈龙; 冯蕾

    2017-01-01

    Recently, Public-private Partnerships (PPPs) are being increasingly used in the public facilities and services provision in China.The procurement system ranges from simple contracting of services to the involvement of the private sector in the infrastructure financing, design, construction, operation and maintenance.However, organizing a PPP is not an easy task due to its complexity and long term contractual obligations and this some projects to fail to attract the private sector in the partnership and in the services provision.18 critical success factors of PPP project in the Chinese health sector were undermined by the investigation of this research.The mostly identified CSFs are thorough and realistic benefit assessment, sound policies, appropriate risk allocation and risk mitigation, and the public/private sector responsibilities.This paper finally puts forward the recommendations based on the statistics that are published from the Integrated Information Platform of CPPPC in order to focus on validating them for successful PPP projects achievement.%随着政府与社会资本合作模式(PPP)在中国的推广运用,越来越多的社会资本参与到公共设施的融资、设计、建造和运营中来.然而,由于PPP本身的复杂性和合同义务的长期性,PPP项目要实现落地并不容易.目前,部分PPP医疗项目在吸引社会资本进入和提供服务上遇到困难.本文通过文献综述和专家咨询获得中国医疗领域PPP的18个关键成功因素(CSF),包括收益分配合理、政府政策稳定、风险分担合理、职责划分明确等,并通过近期财政部PPP中心综合信息平台项目库的公开资料来验证中国PPP关键成功因素体系,为促进PPP成功达成协议提供参考.

  17. Affective Urbanism

    DEFF Research Database (Denmark)

    Samson, Kristine

    Urban design and architecture are increasingly used as material and affective strategies for setting the scene, for manipulation and the production of urban life: The orchestration of atmospheres, the framing and staging of urban actions, the programming for contemplation, involvement, play......, experience and consumption are all strategic design tools applied by planners and architects. Whereas urban design in former modernist planning served merely functional or political means, urban design has increasingly become an aesthetical mediator of ideologies embedded in the urban field of life forces....... Under these circumstances affective aesthetics operate strategically within the urban field of interests, capital flows and desires of the social. This ‘affective urbanism’ (Anderson & Holden 2008) is linked to a society influenced by new kinds of information flows, where culture is mediated and enacted...

  18. 29 CFR 776.0 - Subpart limited to individual employee coverage.

    Science.gov (United States)

    2010-07-01

    ... the Act on the traditional basis of engagement by individual employees “in commerce or in the... 29 Labor 3 2010-07-01 2010-07-01 false Subpart limited to individual employee coverage. 776.0... § 776.0 Subpart limited to individual employee coverage. This subpart, which was adopted before the...

  19. 30 CFR 285.1000 - What activities does this subpart regulate?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What activities does this subpart regulate? 285.1000 Section 285.1000 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR... Activities § 285.1000 What activities does this subpart regulate? (a) This subpart provides the general...

  20. 40 CFR Appendix: Table 1 to... - List of Hazardous Air Pollutants (HAP) for Subpart HHH

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true List of Hazardous Air Pollutants (HAP) for Subpart HHH Table Appendix: Table 1 to Subpart HHH of Part 63 Protection of Environment... HHH of Part 63—List of Hazardous Air Pollutants (HAP) for Subpart HHH CAS Number a Chemical name 75070...

  1. 10 CFR 2.1400 - Purpose and scope of subpart N.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Purpose and scope of subpart N. 2.1400 Section 2.1400... ORDERS Expedited Proceedings with Oral Hearings § 2.1400 Purpose and scope of subpart N. The purpose of... parties otherwise agree and request the application of subpart N procedures, and proceedings for the...

  2. 40 CFR 63.1080 - What is the purpose of this subpart?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false What is the purpose of this subpart... Waste Operations Introduction § 63.1080 What is the purpose of this subpart? This subpart establishes requirements for controlling emissions of hazardous air pollutants (HAP) from heat exchange systems and waste...

  3. 49 CFR 195.551 - What do the regulations in this subpart cover?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false What do the regulations in this subpart cover? 195... SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.551 What do the regulations in this subpart cover? This subpart prescribes minimum requirements for protecting steel pipelines...

  4. 77 FR 12528 - Amendments to Commission's Rules of Practice and Procedure-Subparts E and L

    Science.gov (United States)

    2012-03-01

    ... (Proceedings; Pleadings; Motions; Replies) and Subpart L (Depositions, Written Interrogatories, and Discovery... rules, the Commission proposes to amend Subpart E (Proceedings; Pleadings; Motions; Replies) and Subpart... considering adoption of these federal rules, due regard should be given to the differences in the nature of...

  5. 41 CFR 101-27.500 - Scope and applicability of subpart.

    Science.gov (United States)

    2010-07-01

    ... MANAGEMENT 27.5-Return of GSA Stock Items § 101-27.500 Scope and applicability of subpart. This subpart sets... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope and applicability of subpart. 101-27.500 Section 101-27.500 Public Contracts and Property Management Federal Property...

  6. 17 CFR Table IV to Subpart E of... - Civil Monetary Penalty Inflation Adjustments

    Science.gov (United States)

    2010-04-01

    ... Inflation Adjustments IV Table IV to Subpart E of Part 201 Commodity and Securities Exchanges SECURITIES AND... Table IV to Subpart E of Part 201—Civil Monetary Penalty Inflation Adjustments Table IV to Subpart E U.S. Code citation Civil monetary penalty inflation adjustments Civil monetary penalty description Year...

  7. 40 CFR 63.5110 - What special definitions are used in this subpart?

    Science.gov (United States)

    2010-07-01

    ... not limited to bags, pouches, labels, liners and wraps utilizing paper, plastic, film, aluminum foil... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What special definitions are used in... Subpart Covers § 63.5110 What special definitions are used in this subpart? All terms used in this subpart...

  8. 43 CFR 44.10 - What is the purpose of this subpart?

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the purpose of this subpart? 44.10 Section 44.10 Public Lands: Interior Office of the Secretary of the Interior FINANCIAL ASSISTANCE, LOCAL GOVERNMENTS General Information § 44.10 What is the purpose of this subpart? This subpart sets forth...

  9. 40 CFR 63.6175 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-07-01

    ... from the distillation of petroleum with a boiling point of approximately 150 to 360 degrees Celsius... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What definitions apply to this subpart... Requirements and Information § 63.6175 What definitions apply to this subpart? Terms used in this subpart are...

  10. 41 CFR Appendix A to Subpart B of... - 3-Key Points and Principles

    Science.gov (United States)

    2010-07-01

    ... Principles A Appendix A to Subpart B of Part 102 Public Contracts and Property Management Federal Property.... B, App. A Appendix A to Subpart B of Part 102-3—Key Points and Principles This appendix provides... principles that may be applied to situations not covered elsewhere in this subpart. The guidance follows: Key...

  11. 41 CFR Appendix A to Subpart A of... - 3-Key Points and Principles

    Science.gov (United States)

    2010-07-01

    ... Principles A Appendix A to Subpart A of Part 102 Public Contracts and Property Management Federal Property..., Subpt. A, App. A Appendix A to Subpart A of Part 102-3—Key Points and Principles This appendix provides... principles that may be applied to situations not covered elsewhere in this subpart. The guidance follows: Key...

  12. 77 FR 52341 - Information Collection Activity: Subpart C, Pollution Prevention and Control; Submitted for...

    Science.gov (United States)

    2012-08-29

    ...-0001; OMB Number 1014-NEW] Information Collection Activity: Subpart C, Pollution Prevention and Control... the regulations under Subpart C, Pollution Prevention and Control. This notice also provides the... information. SUPPLEMENTARY INFORMATION: Title: 30 CFR 250, Subpart C, Pollution Prevention and Control. OMB...

  13. 40 CFR 35.4015 - Do certain words in this subpart have specific meaning?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Do certain words in this subpart have....4015 Do certain words in this subpart have specific meaning? Yes, some words in this subpart have specific meanings that are described in§ 35.4270, Definitions. The first time these words are used they are...

  14. PPP1R3C

    Indian Academy of Sciences (India)

    2015-03-12

    Mar 12, 2015 ... The aim of this study was to investigate the effect of high glucose levels on DNA methylation of ... Colorectal cancer (CRC) is the second most common cause ..... compared and analysed with qualitative differences between.

  15. What's the P in PPP?

    Science.gov (United States)

    Heikkila, T.; Lall, U.

    2011-12-01

    Public, Private, Partnership, Participatory, Polycentric, Poor, Perfect, Purveyor, Planner, Positive, Plural, Practical, Political, Process, Pervasive, Phase, Physical, Passive, Progressive, Paradigm? As the world stands at the crossroads of a water scarcity crisis, many wonder whether the "well developed" central planner paradigm of water resources planning, management, investment and regulation that emerged in the last century has served us well. The negative impacts of centralized projects and their management are routinely decried. Service metrics of publicly managed systems continue to deteriorate as the ability to recover operational and maintenance costs continue to be weak. The political processes that portend to protect the access of the disadvantaged are said to contribute to the poor performance of the systems, especially for the disadvantaged. The institutionalization of "well formed" policies that prove inflexible in an environment where supply, demand and societal goals change calls for adaptive management. Stakeholder driven participatory processes and public private partnerships are touted as potential paradigms for progressive solutions that span the political domain and could help achieve positive water balance recognizing the dimensions of supply and demand at local or regional scales. This talk presents a proposed framework that postulates the prospective roles that different actors could play to provide an effective and practical strategy for securing water resources while promoting active allocation strategies, improving access and reliability while promoting profitability for private operators, including progressive farmers who given their usage patterns can make the most prolific contribution to water security. We label this the many P Paradigm. To develop this framework, we draw initial insights from the literature on participatory and decentralized watershed governance. We then apply findings from field experiments on water management reforms in India and Brazil to extend this literature and demonstrate the benefits of the framework to scholars and practitioners alike.

  16. Affect Regulation

    DEFF Research Database (Denmark)

    Pedersen, Signe Holm; Poulsen, Stig Bernt; Lunn, Susanne

    2014-01-01

    Gergely and colleagues’ state that their Social Biofeedback Theory of Parental Affect Mirroring” can be seen as a kind of operationalization of the classical psychoanalytic concepts of holding, containing and mirroring. This article examines to what extent the social biofeedback theory of parenta...

  17. 40 CFR 63.2831 - Where can I find definitions of key words used in this subpart?

    Science.gov (United States)

    2010-07-01

    ... words used in this subpart? 63.2831 Section 63.2831 Protection of Environment ENVIRONMENTAL PROTECTION... Vegetable Oil Production What This Subpart Covers § 63.2831 Where can I find definitions of key words used in this subpart? You can find definitions of key words used in this subpart in § 63.2872. ...

  18. Affective Maps

    DEFF Research Database (Denmark)

    Salovaara-Moring, Inka

    . In particular, mapping environmental damage, endangered species, and human made disasters has become one of the focal point of affective knowledge production. These ‘more-than-humangeographies’ practices include notions of species, space and territory, and movement towards a new political ecology. This type...... of digital cartographies has been highlighted as the ‘processual turn’ in critical cartography, whereas in related computational journalism it can be seen as an interactive and iterative process of mapping complex and fragile ecological developments. This paper looks at computer-assisted cartography as part...

  19. [Affective dependency].

    Science.gov (United States)

    Scantamburlo, G; Pitchot, W; Ansseau, M

    2013-01-01

    Affective dependency is characterized by emotional distress (insecure attachment) and dependency to another person with a low self-esteem and reassurance need. The paper proposes a reflection on the definition of emotional dependency and the confusion caused by various denominations. Overprotective and authoritarian parenting, cultural and socio-environmental factors may contribute to the development of dependent personality. Psychological epigenetic factors, such as early socio-emotional trauma could on neuronal circuits in prefronto-limbic regions that are essential for emotional behaviour.We also focus on the interrelations between dependent personality, domestic violence and addictions. The objective for the clinician is to propose a restoration of self-esteem and therapeutic strategies focused on autonomy.

  20. 14 CFR 1261.601 - Scope of subpart.

    Science.gov (United States)

    2010-01-01

    ... amended (26 U.S.C. 1 et seq.), the Social Security Act (42 U.S.C. 301 et seq.), or the tariff laws of the... claims to the General Accounting Office. This subpart does not preclude an employee from requesting... questioning the amount or validity of a debt by submitting a subsequent claim to the General Accounting Office...

  1. 12 CFR Appendix A to Subpart B of... - Commentary

    Science.gov (United States)

    2010-01-01

    ..., domestic or foreign, including foreign central banks as specified in paragraph (b)(1) of this section... under subpart B because they are not an instruction to a Federal Reserve Bank to pay money. (3) This... account will create an overdraft in the sender's account. The Board and the Federal Reserve Banks have...

  2. 10 CFR Appendix C to Subpart B of... - Compliance Certification

    Science.gov (United States)

    2010-01-01

    ... Energy Efficiency and Renewable Energy, Building Technologies (EE-2J), Forrestal Building, 1000... 10 Energy 3 2010-01-01 2010-01-01 false Compliance Certification C Appendix C to Subpart B of Part 431 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL...

  3. 32 CFR 842.55 - Scope of this subpart.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Scope of this subpart. 842.55 Section 842.55 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE CLAIMS AND LITIGATION... property damage, personal injury, or death caused by military and civilian members of the US Armed Forces...

  4. 40 CFR Table 7 to Subpart Vvvvvv... - Partially Soluble HAP

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 14 2010-07-01 2010-07-01 false Partially Soluble HAP 7 Table 7 to... Pt. 63, Subpt. VVVVVV, Table 7 Table 7 to Subpart VVVVVV of Part 63—Partially Soluble HAP As required... partially soluble HAP listed in the following table. Partially soluble HAP name CAS No. 1. 1,1,1...

  5. 40 CFR Table 3 to Subpart Ggg of... - Soluble HAP

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Soluble HAP 3 Table 3 to Subpart GGG of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... HAP Compound 1,1-Dimethylhydrazine. 1,4-Dioxane. Acetonitrile. Acetophenone. Diethyl sulfate. Dimethyl...

  6. 7 CFR 3016.2 - Scope of subpart.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Scope of subpart. 3016.2 Section 3016.2 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL...

  7. 29 CFR Appendix A to Subpart X of... - Ladders

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Ladders A Appendix A to Subpart X of Part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... designed and built in accordance with the applicable national consensus standards, as set forth below, will...

  8. 48 CFR 51.200 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... Section 51.200 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS... of interagency fleet management system (IFMS) vehicles and related services. In this subpart, the...

  9. 41 CFR 101-26.300 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of subpart. 101-26.300 Section 101-26.300 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  10. 40 CFR Appendix A to Subpart C of... - References

    Science.gov (United States)

    2010-07-01

    ...) AMBIENT AIR MONITORING REFERENCE AND EQUIVALENT METHODS Procedures for Determining Comparability Between Candidate Methods and Reference Methods Pt. 53, Subpt. C, App. A Appendix A to Subpart C of Part 53... 3005, Milwaukee, WI 53202 (http://qualitypress.asq.org). (2) Quality Assurance Guidance Document 2.12...

  11. 7 CFR Appendix to Subpart F of... - Unknown Title

    Science.gov (United States)

    2010-01-01

    ... and Human Nutrition Research and Extension Program. 7 U.S.C. 3171 et seq. 30. Animal Health and... 7 Agriculture 1 2010-01-01 2010-01-01 false Appendix to Subpart F of Part 15a Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM...

  12. 29 CFR 570.32 - Effect of subpart C.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS CHILD LABOR... (Child Labor Reg. 3) § 570.32 Effect of subpart C. Link to an amendment published at 75 FR 28448, May 20... conditions specified in § 570.35 shall not be deemed to be oppressive child labor within the meaning of the...

  13. 41 CFR 115-1.100 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Scope of subpart. 115-1.100 Section 115-1.100 Public Contracts and Property Management Federal Property Management Regulations System (Continued) ENVIRONMENTAL PROTECTION AGENCY 1-INTRODUCTION 1.1-Regulation System § 115-1.100 Scope...

  14. 41 CFR 101-1.100 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of subpart. 101-1.100 Section 101-1.100 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.1-Regulation System § 101-1.100...

  15. 41 CFR 105-1.100 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Scope of subpart. 105-1.100 Section 105-1.100 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION 1-INTRODUCTION 1.1-Regulations System § 105-1.100...

  16. 41 CFR 128-1.100 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Scope of subpart. 128-1.100 Section 128-1.100 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF JUSTICE 1-INTRODUCTION 1.1-Regulation System § 128-1.100 Scope of...

  17. 41 CFR 101-1.4900 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of subpart. 101-1.4900 Section 101-1.4900 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.49-Illustrations of Forms...

  18. 7 CFR 1215.10 - Part and subpart.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... CONSUMER INFORMATION Popcorn Promotion, Research, and Consumer Information Order Definitions § 1215.10 Part and subpart. Part means the Popcorn Promotion, Research, and Consumer Information Order and all rules...

  19. 13 CFR 120.1700 - Definitions used in subpart J.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Definitions used in subpart J. 120.1700 Section 120.1700 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Establishment of SBA Secondary Market Guarantee Program for First Lien Position 504 Loan Pools § 120.1700...

  20. 17 CFR Appendix B to Subpart A of... - Sample Clauses

    Science.gov (United States)

    2010-04-01

    ... Information Pt. 248, Subpt. A, App. B Appendix B to Subpart A of Part 248—Sample Clauses Link to an amendment..., such as “call the following toll-free number: (insert number)”]. A-7—Confidentiality and Security (All...

  1. 40 CFR 141.622 - Subpart V monitoring plan.

    Science.gov (United States)

    2010-07-01

    ... procedures; and (iv) Monitoring plans for any other systems in the combined distribution system if the State... current distribution system locations with expected high TTHM or HAA5 levels. The State may also require modifications in your monitoring plan. If you are a subpart H system serving > 3,300 people, you must submit a...

  2. 48 CFR 1426.7000 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... policies and procedures for implementation of Section 7(b) of the Indian Self-Determination and Education... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scope of subpart. 1426.7000 Section 1426.7000 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC...

  3. 48 CFR 225.7300 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... military sales (FMS) under the Arms Export Control Act (22 U.S.C. Chapter 39). Section 22 of the Arms Export Control Act (22 U.S.C. 2762) authorizes DoD to enter into contracts for resale to foreign countries or international organizations. (b) This subpart does not apply to— (1) FMS made from inventories...

  4. 41 CFR 109-1.5300 - Scope of subpart.

    Science.gov (United States)

    2010-07-01

    ... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1... identification, accounting, control, and disposal policy guidance for the following categories of high risk... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Scope of subpart. 109-1...

  5. 45 CFR 90.11 - Purpose of this subpart.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Purpose of this subpart. 90.11 Section 90.11 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE What is Age Discrimination...

  6. 20 CFR 408.301 - What is this subpart about?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What is this subpart about? 408.301 Section 408.301 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SPECIAL BENEFITS FOR CERTAIN WORLD WAR II..., where and when it must be signed and filed, the period of time it is in effect, and how it may be...

  7. 48 CFR 22.1400 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scope of subpart. 22.1400 Section 22.1400 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Employment of Workers with Disabilities 22...

  8. 31 CFR 203.14 - Scope of the subpart.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Scope of the subpart. 203.14 Section 203.14 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE PAYMENT OF FEDERAL TAXES AND THE TREASURY...

  9. 31 CFR 203.9 - Scope of the subpart.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Scope of the subpart. 203.9 Section 203.9 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE PAYMENT OF FEDERAL TAXES AND THE TREASURY TAX AND...

  10. Study of Calculation Method on Concession Period of PPP Project in Mixed Financing Mode%混合融资的PPP项目特许期计算方法研究

    Institute of Scientific and Technical Information of China (English)

    张芳; 马金平; 靳小青

    2015-01-01

    It is an important measure to lead the private capital to invest on infrastructure construction for the reform of financing structure in fixed assets in China,which makes the financing mode transmit from state single investment to multilateral co-investment. Therefore,it is of great practical significance to explore the problem of calculating the concession period of PPP project in the mixed financing mode. According to the financial management theory,this paper puts forward the calculation method of concession period based on the definition of the concession period,which can determine the concession period for different proportions of contribution and the private gains should be allocated according to the preset proportions. An example is provided to illustrate the application procedure of the method,and verify the reliability and applicability of the proposed method,which provides a reference for determining the concession period in mixed financing mode. This paper also points out the limitation and the future direction of the study.%引导民营资本投入基础设施建设领域是我国改革固定资产投融资结构的一项重要举措,使得我国基础设施建设的融资模式由过去的单一国家投资改为多方共同投资的混合融资模式。因此,探索混合融资模式下的 PPP 项目特许期如何计算的问题具有重要的现实意义。在对特许期的概念进行界定的基础上,根据财务管理理论提出了特许期计算方法。该方法可针对各方的不同投资比例,对在民营期内项目获得的收益,按预设分配比例进行分配的前提下,计算 PPP 项目的特许期。通过对实际案例的分析,说明了计算方法的应用过程,验证了方法的可靠性与适用性,这对于解决混合融资模式下特许期的计算问题具有较大的参考价值。

  11. 40 CFR Table 1 to Subpart Dd of... - List of Hazardous Air Pollutants (HAP) for Subpart DD

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false List of Hazardous Air Pollutants (HAP... Hazardous Air Pollutants (HAP) for Subpart DD CAS No. a Chemical name fm 305 75-07-0 Acetaldehyde 1.000 75... mixtures of compounds. b. Denotes a HAP that hydrolyzes quickly in water, but the hydrolysis products are...

  12. 40 CFR Table 1 to Subpart Vvv of... - Applicability of 40 CFR Part 63 General Provisions to Subpart VVV

    Science.gov (United States)

    2010-07-01

    ... POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants: Publicly Owned... Postmark explanation. § 63.1(a)(12)-(14) Yes Time period changes. Regulation conflict. Force and effect of... State options regarding title V permit. Unless required by the State, area sources subject to subpart...

  13. 40 CFR Table 2 to Subpart Pppp of... - Applicability of General Provisions to Subpart PPPP of Part 63

    Science.gov (United States)

    2010-07-01

    ... of Plastic Parts and Products Pt. 63, Subpt. PPPP, Table 2 Table 2 to Subpart PPPP of Part 63...) Data Reduction No Sections 63.4567 and 63.4568 specify monitoring data reduction. § 63.9(a)-(d...

  14. 40 CFR 63.3300 - Which of my emission sources are affected by this subpart?

    Science.gov (United States)

    2010-07-01

    ... that coats both a paper or other web substrate and a fabric or other textile substrate, except for a... is defined as research or laboratory equipment in § 63.3310. [67 FR 72341, Dec. 4, 2002, as amended...

  15. 40 CFR Table 2 to Subpart Ooo - Stack Emission Limits for Affected Facilities With Capture Systems

    Science.gov (United States)

    2010-07-01

    ... 60.671) that commenced construction, modification, or reconstruction after August 31, 1983 but before April 22, 2008 0.05 g/dscm (0.022 gr/dscf) a 7 percent for dry control devices b An initial performance....670 and 60.671) that commence construction, modification, or reconstruction on or after April 22, 2008...

  16. 基于风险矩阵的BOT-TOT-PPP项目融资风险评估%The Risk Assessment of BOT-TOT-PPP Project Financing Based on Risk Matrix

    Institute of Scientific and Technical Information of China (English)

    李力

    2012-01-01

    风险评估在BOT-TOT-PPP项目中至关重要。本文通过大量案例调研指出,现阶段BOT-TOT-PPP项目融资的风险因素来源于项目外部的政治、经济、文化、社会(环保)以及内部的合同制订、工程技术能力、管理能力和投融资能力方面。风险矩阵和Borda序值对风险的量化评估表明,此类项目现阶段的关键风险集中在政府项目融资管理的专业化水平较低、合同双方对关键指标的确定不合理、投融资管理和工程实施存在问题等方面。%Risk assessment is paramount in BOT-TOT-PPP project.It is indicated through a great deal of cases that risk factors of BOT-TOT-PPP project financing currently derive from politics,economy,culture,society(environmental protection) beyond project,and contract establishment,engineering technology ability,management ability,investment financing ability within project.Quantitative evaluation of risk matrix and Borda counting on risk shows that today major risk of such project concentrates on low management level of governmental project financing,irrational key index in mutual contract,problems involved in financing management and engineering implementation.

  17. 40 CFR 63.5795 - How do I know if my reinforced plastic composites production facility is a new affected source or...

    Science.gov (United States)

    2010-07-01

    ... for Hazardous Air Pollutants: Reinforced Plastic Composites Production What This Subpart Covers § 63.5795 How do I know if my reinforced plastic composites production facility is a new affected source or an existing affected source? (a) A reinforced plastic composites production facility is a new...

  18. 25 CFR Appendix B to Subpart C - Population Adjustment Factor

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Population Adjustment Factor B Appendix B to Subpart C...—Population Adjustment Factor 1. The Population Adjustment Factor allows for participation in the IRR Program... Distribution factor* Number of tribes** Funding amount per tribe Less than 25 1 N1 MBA*** × 1 25-100 3.5 N2 MBA...

  19. 25 CFR 900.114 - Why is there a separate subpart in these regulations for construction contracts and grants?

    Science.gov (United States)

    2010-04-01

    ... SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.114 Why is there a separate subpart in these regulations for construction contracts and grants? There is a separate subpart because the... 25 Indians 2 2010-04-01 2010-04-01 false Why is there a separate subpart in these regulations for...

  20. 40 CFR 63.1176 - Where can I find definitions of key words used in this subpart?

    Science.gov (United States)

    2010-07-01

    ... words used in this subpart? 63.1176 Section 63.1176 Protection of Environment ENVIRONMENTAL PROTECTION... Production § 63.1176 Where can I find definitions of key words used in this subpart? The definitions of key words used in this subpart are in the Clean Air Act (Act), in § 63.2 of the general provisions in...

  1. 40 CFR Table C-1 to Subpart C of... - Test Concentration Ranges, Number of Measurements Required, and Maximum Discrepancy Specification

    Science.gov (United States)

    2010-07-01

    ... Measurements Required, and Maximum Discrepancy Specification C Table C-1 to Subpart C of Part 53 Protection of... Reference Methods Pt. 53, Subpt. C, Table C-1 Table C-1 to Subpart C of Part 53—Test Concentration Ranges..., June 22, 2010, table C-1 to subpart C was revised, effective Aug. 23, 2010. For the convenience of the...

  2. 40 CFR 763.120 - What is the purpose of this subpart?

    Science.gov (United States)

    2010-07-01

    ... Asbestos Standards of the Occupational Safety and Health Administration (OSHA). This subpart applies the OSHA Asbestos Standards in 29 CFR 1910.1001 and 29 CFR 1926.1101 to these employees. ... SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.120 What is the purpose of this subpart...

  3. 10 CFR Appendix A to Subpart U of... - Sampling Plan for Enforcement Testing of Electric Motors

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sampling Plan for Enforcement Testing of Electric Motors A Appendix A to Subpart U of Part 431 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY... to Subpart U of Part 431—Sampling Plan for Enforcement Testing of Electric Motors Step 1. The first...

  4. 24 CFR 55.11 - Applicability of subpart C decision making process.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Applicability of subpart C decision making process. 55.11 Section 55.11 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development FLOODPLAIN MANAGEMENT Application of Executive Order on Floodplain Management § 55.11 Applicability of subpart C...

  5. 7 CFR Exhibit C to Subpart B of... - Cooperative Agreement (Example)

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Cooperative Agreement (Example) C Exhibit C to Subpart B of Part 1955 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING... Exhibit C to Subpart B of Part 1955—Cooperative Agreement (Example) Editorial Note: Exhibit C is not...

  6. 47 CFR Figure 3 to Subpart N of... - Example of Ideal EPIRB Spectrum

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Example of Ideal EPIRB Spectrum 3 Figure 3 to Subpart N of Part 2 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL FREQUENCY ALLOCATIONS AND... Position Indicating Radiobeacons (EPIRBs) Pt. 2, Subpt. N, Fig. 3 Figure 3 to Subpart N of Part 2—Example...

  7. 40 CFR Table 9 to Subpart Ggg of... - Default Biorates for Soluble HAP

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Default Biorates for Soluble HAP 9 Table 9 to Subpart GGG of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Subpart GGG of Part 63—Default Biorates for Soluble HAP Compound name Biorate (K1),L/g MLVSS-hr...

  8. 40 CFR Table 1 to Subpart Uuu of... - Metal HAP Emission Limits for Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Metal HAP Emission Limits for Catalytic Cracking Units 1 Table 1 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION... Table 1 to Subpart UUU of Part 63—Metal HAP Emission Limits for Catalytic Cracking Units As stated in...

  9. 40 CFR Table 15 to Subpart Uuu of... - Organic HAP Emission Limits for Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Organic HAP Emission Limits for Catalytic Reforming Units 15 Table 15 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL..., Table 15 Table 15 to Subpart UUU of Part 63—Organic HAP Emission Limits for Catalytic Reforming Units As...

  10. 40 CFR Table 22 to Subpart Uuu of... - Inorganic HAP Emission Limits for Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Inorganic HAP Emission Limits for Catalytic Reforming Units 22 Table 22 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL..., Table 22 Table 22 to Subpart UUU of Part 63—Inorganic HAP Emission Limits for Catalytic Reforming Units...

  11. 40 CFR Table 29 to Subpart Uuu of... - HAP Emission Limits for Sulfur Recovery Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true HAP Emission Limits for Sulfur Recovery Units 29 Table 29 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... to Subpart UUU of Part 63—HAP Emission Limits for Sulfur Recovery Units As stated in § 63.1568(a)(1...

  12. 40 CFR Table 8 to Subpart Uuu of... - Organic HAP Emission Limits for Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Organic HAP Emission Limits for Catalytic Cracking Units 8 Table 8 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL..., Table 8 Table 8 to Subpart UUU of Part 63—Organic HAP Emission Limits for Catalytic Cracking Units As...

  13. 31 CFR Appendix J to Subpart C of... - Office of the Comptroller of the Currency

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Office of the Comptroller of the Currency J Appendix J to Subpart C of Part 1 Money and Finance: Treasury Office of the Secretary of the Treasury DISCLOSURE OF RECORDS Privacy Act Pt. 1, Subpt. C, App. J Appendix J to Subpart C of Part 1—Office...

  14. 31 CFR Appendix J to Subpart A of... - Office of the Comptroller of the Currency

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Office of the Comptroller of the Currency J Appendix J to Subpart A of Part 1 Money and Finance: Treasury Office of the Secretary of the Treasury DISCLOSURE OF RECORDS Freedom of Information Act Pt. 1, Subpt. A, App. J Appendix J to Subpart A...

  15. 29 CFR Appendix B to Subpart L of... - National Consensus Standards

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false National Consensus Standards B Appendix B to Subpart L of... Appendix B to Subpart L of Part 1910—National Consensus Standards The following table contains a cross-reference listing of those current national consensus standards which contains information and guidelines...

  16. 14 CFR Appendix H to Part 36 - Noise Requirements For Helicopters Under Subpart H

    Science.gov (United States)

    2010-01-01

    ... Subpart H H Appendix H to Part 36 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT NOISE STANDARDS: AIRCRAFT TYPE AND AIRWORTHINESS CERTIFICATION Pt. 36, App. H Appendix H to Part 36—Noise Requirements For Helicopters Under Subpart H part a—reference conditions Sec. H36...

  17. 40 CFR Appendix A to Subpart E of... - Plans for Selective Enforcement Auditing

    Science.gov (United States)

    2010-07-01

    ... Auditing A Appendix A to Subpart E of Part 1068 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Auditing Pt. 1068, Subpt. E, App. A Appendix A to Subpart E of Part 1068—Plans for Selective Enforcement Auditing The following tables describe sampling plans for selective enforcement audits, as described in...

  18. 40 CFR Table 3 to Subpart Jj of... - Summary of Emission Limits

    Science.gov (United States)

    2010-07-01

    ... to Subpart JJ of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... (CONTINUED) National Emission Standards for Wood Furniture Manufacturing Operations Pt. 63, Subpt. JJ, Table 3 Table 3 to Subpart JJ of Part 63—Summary of Emission Limits Emission point Existing source New...

  19. 40 CFR Table 6 to Subpart Jj of... - VHAP of Potential Concern

    Science.gov (United States)

    2010-07-01

    ... Subpart JJ of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...) National Emission Standards for Wood Furniture Manufacturing Operations Pt. 63, Subpt. JJ, Table 6 Table 6 to Subpart JJ of Part 63—VHAP of Potential Concern CAS No. Chemical name EPA de minimis, tons/yr...

  20. 40 CFR Table 2 to Subpart Jj of... - List of Volatile Hazardous Air Pollutants

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false List of Volatile Hazardous Air Pollutants 2 Table 2 to Subpart JJ of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY.... JJ, Table 2 Table 2 to Subpart JJ of Part 63—List of Volatile Hazardous Air Pollutants Chemical name...

  1. 40 CFR 63.7491 - Are any boilers or process heaters not subject to this subpart?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false Are any boilers or process heaters not..., and Institutional Boilers and Process Heaters What This Subpart Covers § 63.7491 Are any boilers or process heaters not subject to this subpart? The types of boilers and process heaters listed in paragraphs...

  2. 5 CFR 1201.121 - Scope of jurisdiction; application of subparts B, F, and H.

    Science.gov (United States)

    2010-01-01

    ... agency actions against administrative law judges, decided under this subpart. Subpart H of this part also... stays of certain personnel actions, proposed agency actions against administrative law judges, and... with Special Counsel complaints and stay requests, and agency actions against administrative law judges...

  3. 46 CFR 1.03-10 - Definition of terms used in this subpart.

    Science.gov (United States)

    2010-10-01

    ... Definition of terms used in this subpart. (a) The term recognized classification society means the American Bureau of Shipping or other classification society recognized by the Commandant. (b) The term new vessel... 46 Shipping 1 2010-10-01 2010-10-01 false Definition of terms used in this subpart. 1.03-10...

  4. 16 CFR Figure 3 to Subpart A of... - Flooring Radiant Tester Schematic Side Elevation

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Flooring Radiant Tester Schematic Side Elevation 3 Figure 3 to Subpart A of Part 1209 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION.... 1209, Subpt. A, Fig. 3 Figure 3 to Subpart A of Part 1209—Flooring Radiant Tester Schematic Side...

  5. 31 CFR Appendix B to Subpart I of... - Recertification Regarding Correspodent Accounts for Foreign Banks

    Science.gov (United States)

    2010-07-01

    ... Correspodent Accounts for Foreign Banks B Appendix B to Subpart I of Part 103 Money and Finance: Treasury Regulations Relating to Money and Finance FINANCIAL RECORDKEEPING AND REPORTING OF CURRENCY AND FOREIGN TRANSACTIONS Anti-Money Laundering Programs Pt. 103, Subpt. I, App. B Appendix B to Subpart I of Part 103...

  6. 31 CFR Appendix A to Subpart I of... - Certification Regarding Correspondent Accounts for Foreign Banks

    Science.gov (United States)

    2010-07-01

    ... Accounts for Foreign Banks A Appendix A to Subpart I of Part 103 Money and Finance: Treasury Regulations Relating to Money and Finance FINANCIAL RECORDKEEPING AND REPORTING OF CURRENCY AND FOREIGN TRANSACTIONS Anti-Money Laundering Programs Pt. 103, Subpt. I, App. A Appendix A to Subpart I of Part 103...

  7. 12 CFR Appendix A to Subpart A of... - Federal Home Loan Banks

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Federal Home Loan Banks A Appendix A to Subpart... Board Pt. 905, Subpt. A, App. A Appendix A to Subpart A of Part 905—Federal Home Loan Banks Federal Home Loan Bank District 1 (Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont) Federal...

  8. 40 CFR Table 1 to Subpart Xx of... - Hazardous Air Pollutants

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Hazardous Air Pollutants 1 Table 1 to Subpart XX of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Operations Pt. 63, Subpt. XX, Table 1 Table 1 to Subpart XX of Part 63—Hazardous Air Pollutants Hazardous air...

  9. 21 CFR 1.362 - What records are excluded from this subpart?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false What records are excluded from this subpart? 1.362 Section 1.362 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL... Requirements § 1.362 What records are excluded from this subpart? The establishment and maintenance of records...

  10. 40 CFR Table A-1 to Subpart A of... - Global Warming Potentials

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Global Warming Potentials A Table A-1 to Subpart A of Part 98 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) MANDATORY GREENHOUSE GAS REPORTING General Provision Pt. 98, Subpt. A, Table A-1 Table A-1 to Subpart A of Part 98—Global Warming...

  11. 45 CFR 260.51 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-10-01

    ... of Domestic Violence? § 260.51 What definitions apply to this subpart? Family Violence Option (or FVO... 45 Public Welfare 2 2010-10-01 2010-10-01 false What definitions apply to this subpart? 260.51 Section 260.51 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE...

  12. 40 CFR 63.1561 - Am I subject to this subpart?

    Science.gov (United States)

    2010-07-01

    ... Standards for Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units What This Subpart Covers § 63.1561 Am I subject to this subpart... reforming an intermediate petroleum stream, or recovering a by-product(s) from the intermediate petroleum...

  13. 15 CFR Appendix A to Subpart G of... - Channel Islands National Marine Sanctuary Boundary Coordinates

    Science.gov (United States)

    2010-01-01

    ... Sanctuary Boundary Coordinates A Appendix A to Subpart G of Part 922 Commerce and Foreign Trade Regulations..., DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Channel Islands National Marine Sanctuary Pt. 922, Subpt. G, App. A Appendix A to Subpart G of Part 922...

  14. 15 CFR Appendix C to Subpart M of... - Dredged Material Disposal Sites Within the Sanctuary

    Science.gov (United States)

    2010-01-01

    ... the Sanctuary C Appendix C to Subpart M of Part 922 Commerce and Foreign Trade Regulations Relating to... COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Monterey Bay National Marine Sanctuary Pt. 922, Subpt. M, App. C Appendix C to Subpart M of Part 922—Dredged Material...

  15. 15 CFR Appendix A to Subpart N of... - Stellwagen Bank National Marine Sanctuary Boundary Coordinates

    Science.gov (United States)

    2010-01-01

    ... Sanctuary Boundary Coordinates A Appendix A to Subpart N of Part 922 Commerce and Foreign Trade Regulations..., DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Stellwagen Bank National Marine Sanctuary Pt. 922, Subpt. N, App. A Appendix A to Subpart N of Part 922...

  16. 15 CFR Appendix A to Subpart L of... - Flower Garden Banks National Marine Sanctuary Boundary Coordinates

    Science.gov (United States)

    2010-01-01

    ... Sanctuary Boundary Coordinates A Appendix A to Subpart L of Part 922 Commerce and Foreign Trade Regulations..., DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Flower Garden Banks National Marine Sanctuary Pt. 922, Subpt. L, App. A Appendix A to Subpart L of Part...

  17. 15 CFR Appendix A to Subpart O of... - Olympic Coast National Marine Sanctuary Boundary Coordinates

    Science.gov (United States)

    2010-01-01

    ... Sanctuary Boundary Coordinates A Appendix A to Subpart O of Part 922 Commerce and Foreign Trade Regulations..., DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Olympic Coast National Marine Sanctuary Pt. 922, Subpt. O, App. A Appendix A to Subpart O of Part 922...

  18. 40 CFR 60.2020 - What combustion units are exempt from this subpart?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What combustion units are exempt from..., 2001 Applicability § 60.2020 What combustion units are exempt from this subpart? This subpart exempts... byproduct streams/residues containing catalyst metals which are reclaimed and reused as catalysts or used to...

  19. 40 CFR 63.11398 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-07-01

    ... comonomers are suspended in water in the presence of a catalyst where they polymerize under agitation. Solid... 40 Protection of Environment 14 2010-07-01 2010-07-01 false What definitions apply to this subpart... Production Area Sources Other Requirements and Information § 63.11398 What definitions apply to this subpart...

  20. 40 CFR 63.1562 - What parts of my plant are covered by this subpart?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What parts of my plant are covered by... What parts of my plant are covered by this subpart? (a) This subpart applies to each new, reconstructed...-regenerative, cyclic, or continuous processes) that are associated with regeneration of the catalyst used in...

  1. 17 CFR Table III to Subpart E of... - Civil Monetary Penalty Inflation Adjustments

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Civil Monetary Penalty Inflation Adjustments III Table III to Subpart E of Part 201 Commodity and Securities Exchanges SECURITIES..., Table III Table III to Subpart E of Part 201—Civil Monetary Penalty Inflation Adjustments U.S. Code...

  2. 40 CFR Table 8 to Subpart Xxxx of... - Initial Compliance With the Emission

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Initial Compliance With the Emission 8 Table 8 to Subpart XXXX of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED.... XXXX, Table 8 Table 8 to Subpart XXXX of Part 63—Initial Compliance With the Emission As stated in § 63...

  3. 40 CFR Table 4 to Subpart Xxxx of... - Operating Limits for Puncture Sealant Application Control Devices

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for Puncture Sealant Application Control Devices 4 Table 4 to Subpart XXXX of Part 63 Protection of Environment ENVIRONMENTAL... Manufacturing Pt. 63, Subpt. XXXX, Table 4 Table 4 to Subpart XXXX of Part 63—Operating Limits for Puncture...

  4. 40 CFR Table 5 to Subpart Xxxx of... - Requirements for Performance Tests

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Requirements for Performance Tests 5 Table 5 to Subpart XXXX of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED.... XXXX, Table 5 Table 5 to Subpart XXXX of Part 63—Requirements for Performance Tests As stated in § 63...

  5. 40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports

    Science.gov (United States)

    2010-07-01

    ... Subpart XXXX of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Standards for Hazardous Air Pollutants: Rubber Tire Manufacturing Pt. 63, Subpt. XXXX, Table 15 Table 15 to Subpart XXXX of Part 63—Requirements for Reports As stated in § 63.6010, you must submit each report that...

  6. 40 CFR Table 16 to Subpart Xxxx of... - Selected Hazardous Air Pollutants

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Selected Hazardous Air Pollutants 16 Table 16 to Subpart XXXX of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED.... XXXX, Table 16 Table 16 to Subpart XXXX of Part 63—Selected Hazardous Air Pollutants You must use the...

  7. 40 CFR Appendix E to Subpart A of... - Article 5 Parties

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Article 5 Parties E Appendix E to Subpart A of Part 82 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Appendix E to Subpart A of Part 82—Article 5 Parties Afghanistan, Albania, Algeria, Angola, Antigua...

  8. 40 CFR 725.305 - Persons who may apply under this subpart.

    Science.gov (United States)

    2010-07-01

    ... a result of the test marketing. A person may apply under this subpart for the following test... for Test Marketing § 725.305 Persons who may apply under this subpart. A person identified in this section may apply for a test marketing exemption. EPA may grant the exemption if the person demonstrates...

  9. 40 CFR 63.4181 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-07-01

    ... may be required to meet the data acquisition and availability requirements of this subpart used to... subpart during startup, shutdown, or malfunction regardless of whether or not such failure is permitted by.... Responsible official means responsible official as defined in 40 CFR 70.2. Startup, initial means the first...

  10. 40 CFR 63.4371 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-07-01

    ... meet the data acquisition and availability requirements of this subpart, used to sample, condition (if... limit, or operating limit, or work practice standard in this subpart during startup, shutdown, or... substrate. Startup, initial means the first time equipment is brought online in a facility. Surface...

  11. 40 CFR 63.3310 - What definitions are used in this subpart?

    Science.gov (United States)

    2010-07-01

    ..., bags, pouches, labels, liners and wraps utilizing paper, plastic, film, aluminum foil, metalized or... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What definitions are used in this... Covers § 63.3310 What definitions are used in this subpart? All terms used in this subpart that are not...

  12. 40 CFR 60.4315 - What pollutants are regulated by this subpart?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What pollutants are regulated by this subpart? 60.4315 Section 60.4315 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... pollutants regulated by this subpart are nitrogen oxide (NOX) and sulfur dioxide (SO2). ...

  13. 41 CFR Appendix A to Subpart D of... - 3-Key Points and Principles

    Science.gov (United States)

    2010-07-01

    ... Principles A Appendix A to Subpart D of Part 102 Public Contracts and Property Management Federal Property... Subpart D of Part 102-3—Key Points and Principles This appendix provides additional guidance in the form of answers to frequently asked questions and identifies key points and principles that may be applied...

  14. 29 CFR Appendix A to Subpart W to... - Figures W-14 through W-28

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Figures W-14 through W-28 A Appendix A to Subpart W to part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION...; Overhead Protection Pt. 1926, Subpt. W, App. A Appendix A to Subpart W to part 1926—Figures W-14 through W...

  15. 40 CFR 26.201 - To what does this subpart apply?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false To what does this subpart apply? 26.201 Section 26.201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PROTECTION OF HUMAN... Subjects who are Children or Pregnant or Nursing Women § 26.201 To what does this subpart apply? (a) This...

  16. 40 CFR 26.1201 - To what does this subpart apply?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false To what does this subpart apply? 26.1201 Section 26.1201 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PROTECTION OF... Human Subjects who are Children or Pregnant or Nursing Women § 26.1201 To what does this subpart apply...

  17. 40 CFR 26.1101 - To what does this subpart apply?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false To what does this subpart apply? 26.1101 Section 26.1101 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PROTECTION OF... Intentional Exposure of Non-pregnant, Non-nursing Adults § 26.1101 To what does this subpart apply? (a) Except...

  18. 40 CFR Table A-2 to Subpart A of... - Units of Measure Conversions

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Units of Measure Conversions A Table A-2 to Subpart A of Part 98 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... A-2 to Subpart A of Part 98—Units of Measure Conversions To convert from To Multiply by Kilograms...

  19. 20 CFR 603.3 - What is the purpose and scope of this subpart?

    Science.gov (United States)

    2010-04-01

    ... 3304(a)(16), Federal Unemployment Tax Act (FUTA). This subpart also establishes uniform minimum requirements for the payment of costs, safeguards, and data-sharing agreements when UC information is disclosed, and for conformity and substantial compliance with this proposed rule. This subpart applies to States...

  20. Key Drivers of PPPs in Electricity Generation in Developing Countries : Cross-Country Evidence of Switching between PPP Investment in Fossil Fuel and Renewable-Based Generation

    OpenAIRE

    Vagliasindi, Maria

    2012-01-01

    This paper presents new global evidence on the key determinants of public-private partnership investment in electricity generated by fossil fuels and renewable energy based on a panel data analysis for 105 developing countries over a period of 16 years from 1993 to 2008. It aims to identify the key factors affecting private investors' decision to enter electricity generation, through probi...

  1. Genetic Polymorphisms in XRCC1, CD3EAP, PPP1R13L, XPB, XPC, and XPF and the Risk of Chronic Benzene Poisoning in a Chinese Occupational Population.

    Directory of Open Access Journals (Sweden)

    Ping Xue

    Full Text Available Individual variations in the capacity of DNA repair machinery to relieve benzene-induced DNA damage may be the key to developing chronic benzene poisoning (CBP, an increasingly prevalent occupational disease in China. ERCC1 (Excision repair cross complementation group 1 is located on chromosome 19q13.2-3 and participates in the crucial steps of Nucleotide Excision Repair (NER; moreover, we determined that one of its polymorphisms, ERCC1 rs11615, is a biomarker for CBP susceptibility in our previous report. Our aim is to further explore the deeper association between some genetic variations related to ERCC1 polymorphisms and CBP risk.Nine single nucleotide polymorphisms (SNPs of XRCC1 (X-ray repair cross-complementing 1, CD3EAP (CD3e molecule, epsilon associated protein, PPP1R13L (protein phosphatase 1, regulatory subunit 13 like, XPB (Xeroderma pigmentosum group B, XPC (Xeroderma pigmentosum group C and XPF (Xeroderma pigmentosum group F were genotyped by the Snapshot and TaqMan-MGB® probe techniques, in a study involving 102 CBP patients and 204 controls. The potential interactions between these SNPs and lifestyle factors, such as smoking and drinking, were assessed using a stratified analysis.An XRCC1 allele, rs25487, was related to a higher risk of CBP (P<0.001 even after stratifying for potential confounders. Carriers of the TT genotype of XRCC1 rs1799782 who were alcohol drinkers (OR = 8.000; 95% CI: 1.316-48.645; P = 0.022, male (OR = 9.333; 95% CI: 1.593-54.672; P = 0.019, and had an exposure of ≤12 years (OR = 2.612; 95% CI: 1.048-6.510; P = 0.035 had an increased risk of CBP. However, the T allele in PPP1R13L rs1005165 (P<0.05 and the GA allele in CD3EAP rs967591 (OR = 0.162; 95% CI: 0039~0.666; P = 0.037 decreased the risk of CBP in men. The haplotype analysis of XRCC1 indicated that XRCC1 rs25487A, rs25489G and rs1799782T (OR = 15.469; 95% CI: 5.536-43.225; P<0.001 were associated with a high risk of CBP.The findings showed that

  2. 服务购买型公私合作(PPP)项目财政补偿的有效区间研究%The Study on the Effective Range of Fiscal Compensation of Public Private Partnerships Project Regarding Services Sold to the Public Sector

    Institute of Scientific and Technical Information of China (English)

    胡振; 王秀婧; 刘华

    2013-01-01

    Through the comparison of investment and operating costs occurred under traditional development and Public Private Partnerships (PPP) regarding services sold to the public sector, this paper studies the fundamental model regarding the effective range of fiscal compensation, as well as its evolution in the context of the existence of advanced supply of public service. The model shows that due to the advantages in finance, technology and management, the private entities could produce the "win-win range" of PPP projects, and both public and private stakeholders can gain benefit by fiscal compensation on the range.%通过对比传统开发与公私合作(PPP)两种模式下的投资和经营成本,研究服务购买型PPP项目财政补偿有效区间的基础模型;考虑公共服务提前供应条件下基础模型的演变,表明由于民间实体利用其资金、技术以及管理优势,能够创造出PPP项目的“双赢区间”,在该区间内进行财政补偿,公私双方都能获益.

  3. How does real affect affect affect recognition in speech?

    NARCIS (Netherlands)

    Truong, Khiet Phuong

    2009-01-01

    The automatic analysis of affect is a relatively new and challenging multidisciplinary research area that has gained a lot of interest over the past few years. The research and development of affect recognition systems has opened many opportunities for improving the interaction between man and

  4. 沼肥还田的公共私营合作制(PPP)模式浅析——以邛崃市为例%A Brief Analysis of Public-Private-Partnership System for Biogas Fertilizer Returning to Field: Qionglai Case

    Institute of Scientific and Technical Information of China (English)

    林赛男; 李冬梅; 冉毅; 蔡萍

    2017-01-01

    Biogas fertilizer returning to the fields in China has been in a difficult position for its high cost of application,the information asymmetry between the supply and demand sides,imperfect facilities and equipment,and lack of public participation.Bringing in the Public-Private-Partnership system (PPP) could break the bottle-neck of biogas fertilizer utilization and promote the high efficient utilization.This paper analyzed the implementation of the PPP mode for biogas fertilizer returning to the fields in Qionglai County,and summarized the efficiency of field utilization of biogas fertilizer.And it was demonstrated that the PPP system brought ecological,economic and social benefits to Qionglai.Moreover,some suggestions were proposed for promoting the PPP system implementation,including detailing rules,optimizing social capital,market-oriented strategy,and strengthening government supervision.%我国沼肥还田陷入了使用成本高、供需信息不对称、设施设备不完善、公众参与度不高的困境.引入公共私营合作制(PPP)模式破解沼肥利用瓶颈,推动沼肥高效利用成为农村沼气工程发展的新趋势.文章对邛崃市畜禽粪污处理沼气工程中沼肥还田的PPP模式实施情况进行分析,从生态、经济和社会3方面总结邛崃沼肥还田运行效益.为加快沼肥还田PPP项目落地,笔者提出制定PPP模式实施细则、优选社会资本、以市场为导向、加强政府监管等实施建议.

  5. Pterins and affective disorders

    NARCIS (Netherlands)

    R. Hoekstra (Rocco)

    2007-01-01

    textabstractThe pathophysiology of affective disorders is largely unknown. In patients with various affective disorders the activity of pterins and related amino acids were investigated before and after clinical treatment. In particular the bipolar affective disorder could be

  6. 13 CFR 101.401 - What programs and activities of SBA are subject to this subpart?

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATION ADMINISTRATION Intergovernmental Partnership § 101.401 What programs and activities of SBA are subject to this subpart? SBA publishes in the Federal Register a list of programs and activities subject...

  7. 13 CFR 101.400 - What is the purpose of this subpart?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What is the purpose of this subpart? 101.400 Section 101.400 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION... at law. ...

  8. Subpart W: National Emission Standards for Radon Emissions From Operating Mill Tailings

    Science.gov (United States)

    Subpart W limits the radon-222 emissions rate from uranium tailings piles to 20 picocuries per square meter per second and requires that new tailings impoundments meet certain work practice standards.

  9. 40 CFR 63.1560 - What is the purpose of this subpart?

    Science.gov (United States)

    2010-07-01

    ... Standards for Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units, Catalytic... from petroleum refineries. This subpart also establishes requirements to demonstrate initial and continuous compliance with the emission limitations and work practice standards. ...

  10. 40 CFR 63.3004 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-07-01

    ... limit, or operating limit, or work practice standard in this subpart during startup, shutdown, or... the amount of finished product needed to cover an area 10 feet by 10 feet (100 square feet) of...

  11. 7 CFR Exhibit F to Subpart I of... - Site Option Loan to Technical Assistance Grantees

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE... decision reviewed following the procedure established in subpart B of part 1900 of this chapter. (2) Review...

  12. 16 CFR Figure 5 to Subpart A of... - Zero Reference Point Related to Detecting Plane

    Science.gov (United States)

    2010-01-01

    ... Plane 5 Figure 5 to Subpart A of Part 1209 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION The Standard Pt... Plane EC03OC91.035 ...

  13. 49 CFR 192.1003 - What do the regulations in this subpart cover?

    Science.gov (United States)

    2010-10-01

    ... AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas...? General. This subpart prescribes minimum requirements for an IM program for any gas distribution pipeline...

  14. 40 CFR Table 2 to Subpart Ggg of... - Partially Soluble HAP

    Science.gov (United States)

    2010-07-01

    ... Standards for Pharmaceuticals Production Pt. 63, Subpt. GGG, Table 2 Table 2 to Subpart GGG of Part 63... Epichlorohydrin 1,3-Dichloropropene Ethyl acrylate 2,4,5-Trichlorophenol Ethylbenzene 2-Butanone (mek) Ethylene...

  15. 46 CFR Exhibit No. 3 to Subpart E... - Petition for Leave To Intervene

    Science.gov (United States)

    2010-10-01

    ... PROVISIONS RULES OF PRACTICE AND PROCEDURE Proceedings; Pleadings; Motions; Replies Pt. 502, Subpt. E, Exh. 3...., as in Exhibit No. 1 to this subpart, and nature and principal place of business]. II. [Here set out...

  16. 40 CFR 63.4781 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-07-01

    ... acquisition and availability requirements of this subpart used to sample, condition (if applicable), analyze... minimis manner. Responsible official means responsible official as defined in 40 CFR 70.2. Startup...

  17. 40 CFR Table 6 to Subpart Ddddd of... - Fuel Analysis Requirements

    Science.gov (United States)

    2010-07-01

    ... Institutional Boilers and Process Heaters Pt. 63, Subpt. DDDDD, Table 6 Table 6 to Subpart DDDDD of Part 63—Fuel... of pounds of pollutant per MMBtu of heat content. 3. Hydrogen Chloride * * * a. Collect fuel samples...

  18. 40 CFR Table 2b to Subpart E of... - Reactivity Factors for Aliphatic Hydrocarbon Solvent Mixtures

    Science.gov (United States)

    2010-07-01

    ... Hydrocarbon Solvent Mixtures 2B Table 2B to Subpart E of Part 59 Protection of Environment ENVIRONMENTAL... Hydrocarbon Solvent Mixtures Bin Averageboiling point * (degrees F) Criteria Reactivityfactor 1 80-205 Alkanes... + Dry Point) / 2 (b) Aromatic Hydrocarbon Solvents ...

  19. 40 CFR 141.571 - What records does subpart T require my system to keep?

    Science.gov (United States)

    2010-07-01

    ... records does subpart T require my system to keep? Your system must keep several types of records based on... Benchmarking(§§ 141.540-141.544) Benchmark (including raw data and analysis) Indefinitely. ...

  20. 31 CFR Appendix K to Subpart C of... - Federal Law Enforcement Training Center

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Federal Law Enforcement Training Center K Appendix K to Subpart C of Part 1 Money and Finance: Treasury Office of the Secretary of the Treasury DISCLOSURE OF RECORDS Privacy Act Pt. 1, Subpt. C, App. K Appendix K to Subpart C of Part 1—Federal Law Enforcement Training Center 1. In...

  1. 31 CFR Appendix K to Subpart A of... - Federal Law Enforcement Training Center

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Federal Law Enforcement Training Center K Appendix K to Subpart A of Part 1 Money and Finance: Treasury Office of the Secretary of the Treasury DISCLOSURE OF RECORDS Freedom of Information Act Pt. 1, Subpt. A, App. K Appendix K to Subpart A of Part 1—Federal Law Enforcement Training...

  2. Mediatised affective activism

    DEFF Research Database (Denmark)

    Reestorff, Camilla Møhring

    2014-01-01

    bodies by addressing affective registers. The mediatised ‘affective environment’ (Massumi, 2009) cues bodies and generates spreadability, yet it also produces disconnections. These disconnections might redistribute the ‘economy of recognizability’ (Butler and Athanasiou, 2013); however, the Femen...

  3. 29 CFR Appendix D to Subpart R of... - Illustration of the Use of Control Lines To Demarcate Controlled Decking Zones (CDZs): Non...

    Science.gov (United States)

    2010-07-01

    ... to Subpart R of Part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND... Steel Erection Pt. 1926, Subpt. R, App. D Appendix D to Subpart R of Part 1926—Illustration of the Use...

  4. 29 CFR Appendix F to Subpart R of... - Perimeter Columns: Non-Mandatory Guidelines for Complying With § 1926.756(e) To Protect the...

    Science.gov (United States)

    2010-07-01

    ... to Subpart R of Part 1926 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND... Steel Erection Pt. 1926, Subpt. R, App. F Appendix F to Subpart R of Part 1926—Perimeter Columns: Non...

  5. Affectivity in the Liminal

    DEFF Research Database (Denmark)

    Thomassen, Bjørn

    In this paper I propose a return to the work of Arnold van Gennep, in order to briefly discuss how the terms of liminality and affectivity were always already connected. By linking the concept of liminality that van Gennep made famous to affectivity, we are actually not proposing new...... at the threshold. The paper contains three sections: a) liminality and affectivity in van Gennep’s life; b) liminality and affectivity as a theme in his work; c) liminality and affectivity as developed in the early reception of his work....

  6. 12 Layout PPP adjusted.pmd

    African Journals Online (AJOL)

    Nubidga

    EDITORIAL. Reflections on Professionalization of Education in Cameroon. In his message to the youth on the eve of the 2015. 11th February Youth Day celebrations the Head of State, President Paul Biya, once more called for the professionalization of education in. Cameroon .This call comes eight years after the launching ...

  7. 11.2 Layout ppp1.pmd

    African Journals Online (AJOL)

    Nubidga

    from grasping the entire message from the original interview. Furthermore ... over translation mode in television networks across the country are proposed based on these results. Key Words: .... impact of the loss of meaning and the impact it.

  8. 12 Layout PPP adjusted.pmd

    African Journals Online (AJOL)

    Nubidga

    âge. Pan-africain et se caractérise par une association de roches plutoniques et volcaniques diversifiées. L'étude géochimique des éléments majeurs, des éléments traces et des terres rares montre l'appartenance des roches à la série ...

  9. Defining the private partners in PPP

    International Nuclear Information System (INIS)

    Van der Vleuten-Balkema, F.; Stam, N.

    2004-01-01

    Now that the public private partnerships are seen to be the way forward in solar electrification in developing countries, it is important to question who will be the private partner in the partnership? For decentralized energy technologies such as solar home systems, that are being disseminated to vast numbers of highly dispersed end-users, the private partners of today are the hundreds or thousands of often non specialized local entrepreneurs. The public private partnerships of tomorrow should be reoriented accordingly. (authors)

  10. 11.2 Layout ppp1.pmd

    African Journals Online (AJOL)

    Nubidga

    changement climatique sur les ressources en eau au Cameroun sur la base des données historiques, de ... L'étude conclut ..... Garoua (sudano sahelien zone), the annual rainfall ..... final : programme d'approches intégrée et globales.

  11. 12 Layout PPP adjusted.pmd

    African Journals Online (AJOL)

    Nubidga

    E'en what you cherish give out as dash. Thus asking for a simple, modest favour. Lead indeed to a great endeavour. II. Looking for fish or food to eat and live. Is seeking wisdom to grow and thrive. You come to the Varsity with your hopes,. She takes you up the slopes,. Of transforming theories,. Outstanding past histories,.

  12. 12 Layout PPP adjusted.pmd

    African Journals Online (AJOL)

    Nubidga

    chromatography and some pure compounds were obtained whose structures were determined by 1H and. 13C-NMR ... major approaches to control the disease (Wanji et al. 2009). Ivermectin ..... carbons of E-geometry of alkenes have δ 30.0,.

  13. Precipitable Water Comparisons Over Ghana using PPP ...

    African Journals Online (AJOL)

    Akwasi Afrifa Acheampong

    Abstract. Atmospheric Water vapor is an important greenhouse gas and contributes greatly in maintaining ... enhanced radiation dependent cloud and water vapour feedbacks (IPCC, 2014). ..... COST-716 near real-time demonstration project.

  14. 11.2 Layout ppp1.pmd

    African Journals Online (AJOL)

    Nubidga

    metamorphic, and volcanic aquifers in the southern part of Ndian Division indicated the ... bromide de 77,28 et 0,08 mg/l respectivement. ...... remote sensing (radar) studies, and further ground .... in the Cross River State, southern Nigeria.

  15. 11.2 Layout ppp1.pmd

    African Journals Online (AJOL)

    Nubidga

    An assessment of records of past climatic data (rainfall and temperatures) recorded within three zones ( Mondoni,. Tiko and Benoe ) of the Project from ... and in lowland humid conditions with continuous total annual rainfall of 2000 to 2500mm ..... According to Bridge et al., (1998) and Ploetz. (2004), burrowing nematodes ...

  16. 11.2 Layout ppp1.pmd

    African Journals Online (AJOL)

    Nubidga

    Department of English language teaching, Jahrom branch, Islamic Azad ... effectiveness of mobile phone for teaching, 94 students were in the study. ... method revealed that the SBT group performed better than the control group. ... The importance of knowing a foreign language .... this is very popular in vocabulary tests.

  17. 12 Layout PPP adjusted.pmd

    African Journals Online (AJOL)

    Nubidga

    these preoccupations by exploring the bases (philosophical, social) of this imperative as well as the ..... phase of history by the public sphere and results ..... 1 The written media also finds itself often in this category as journalists in the name of ...

  18. 12 Layout PPP adjusted.pmd

    African Journals Online (AJOL)

    Nubidga

    chilli extracts as active ingridients) proved to be a poor insecticide against this weevil. Bromorex® also showed low non-mortality effects on the weevils with a high rate of egg laid and larvae emergence (17.3±4.5 and. 1.6±0.4 respectively). Insector®, Regent® and Counter® completely inhibited larvae emergence from eggs ...

  19. Will ppp survive the credit crunch?

    NARCIS (Netherlands)

    Dewulf, Geert P.M.R.

    2010-01-01

    Today, governments are confronted with increasing budget deficits. While governments have less money available big investments in infrastructure are planned to stimulate economic growth. As a reaction, private investments are needed to meet the growing demand for infrastructure. Third party

  20. 12 Layout PPP adjusted.pmd

    African Journals Online (AJOL)

    Nubidga

    and HCV among co-infected patients in Cameroon, viral RNA was isolated from HIV/HCV co-infected individuals, in. Douala, Cameroon. ... RT-PCR, gene/TOPO cloning, DNA sequencing, and bioinformatics tools for sequence management and analysis. ... HCV subtypes investigated were 1a, 1b, 1c, 2a, 2c, 2k, and 4a.

  1. 11.2 Layout ppp1.pmd

    African Journals Online (AJOL)

    Nubidga

    A total of 41.4% (156/377) of the pregnant women were infected with malaria parasitaemia. Due to repeated infections ... it is an important factor associated with an increased risk of ..... is one of the complications of malaria was mild. Most of the ...

  2. Engaging in Affective Practices

    DEFF Research Database (Denmark)

    Galløe, Lotte Rannveig

    schools, the paper develops an affective-power approach drawing on Foucault’s notion of power and Whetherell’s conceptualisation of affect. The approach captures the affective dimension of governing and resistance in interactional practice that engages teachers and pupils. This enables a research focus......The paper presents how the merging of the theoretical concepts ‘Affect’ and ‘Power’ faces methodological and ethical challenges when entangled in teachers’ and pupils’ practice. Based on a study of pedagogical methods aiming to shape certain affective relations and avoid conflicts in Danish primary....... Witnessing tense conflict situations taking place I as a researcher get affected as well, and in turn affect the practice myself. Because, both the teacher, pupil, and I are well aware of my research focus on power and affect, being observed in conflictual situations contributes to pervasive shame...

  3. 30 CFR 206.360 - What records must I keep to support my calculations of royalty or fees under this subpart?

    Science.gov (United States)

    2010-07-01

    ... calculations of royalty or fees under this subpart? 206.360 Section 206.360 Mineral Resources MINERALS... Resources § 206.360 What records must I keep to support my calculations of royalty or fees under this subpart? If you determine royalties or direct use fees for your geothermal resource under this subpart...

  4. 40 CFR Figure 1 to Subpart Tttt of... - Example Logs for Recording Leather Finish Use and HAP Content

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Example Logs for Recording Leather Finish Use and HAP Content 1 Figure 1 to Subpart TTTT of Part 63 Protection of Environment ENVIRONMENTAL... Finishing Operations Part 63, Subpt. TTTT, Fig. 1 Figure 1 to Subpart TTTT of Part 63—Example Logs for...

  5. 40 CFR Table 6 to Subpart Uuu of... - Continuous Compliance With Metal HAP Emission Limits for Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Metal HAP Emission Limits for Catalytic Cracking Units 6 Table 6 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 6 Table 6 to Subpart UUU of Part 63—Continuous Compliance With Metal HAP Emission...

  6. 40 CFR Table 30 to Subpart Uuu of... - Operating Limits for HAP Emissions From Sulfur Recovery Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for HAP Emissions From Sulfur Recovery Units 30 Table 30 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL..., Table 30 Table 30 to Subpart UUU of Part 63—Operating Limits for HAP Emissions From Sulfur Recovery...

  7. 40 CFR Table 9 to Subpart Uuu of... - Operating Limits for Organic HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for Organic HAP Emissions From Catalytic Cracking Units 9 Table 9 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 9 Table 9 to Subpart UUU of Part 63—Operating Limits for Organic HAP Emissions From...

  8. 40 CFR Table 16 to Subpart Uuu of... - Operating Limits for Organic HAP Emissions From Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for Organic HAP Emissions From Catalytic Reforming Units 16 Table 16 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 16 Table 16 to Subpart UUU of Part 63—Operating Limits for Organic HAP Emissions From...

  9. 40 CFR Table 5 to Subpart Uuu of... - Initial Compliance With Metal HAP Emission Limits for Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Initial Compliance With Metal HAP Emission Limits for Catalytic Cracking Units 5 Table 5 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 5 Table 5 to Subpart UUU of Part 63—Initial Compliance With Metal HAP Emission Limits...

  10. 40 CFR Table 33 to Subpart Uuu of... - Initial Compliance With HAP Emission Limits for Sulfur Recovery Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Initial Compliance With HAP Emission Limits for Sulfur Recovery Units 33 Table 33 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 33 Table 33 to Subpart UUU of Part 63—Initial Compliance With HAP Emission Limits for...

  11. 40 CFR Table 31 to Subpart Uuu of... - Continuous Monitoring Systems for HAP Emissions From Sulfur Recovery Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Monitoring Systems for HAP Emissions From Sulfur Recovery Units 31 Table 31 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 31 Table 31 to Subpart UUU of Part 63—Continuous Monitoring Systems for HAP Emissions...

  12. 40 CFR Table 36 to Subpart Uuu of... - Work Practice Standards for HAP Emissions From Bypass Lines

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Work Practice Standards for HAP Emissions From Bypass Lines 36 Table 36 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL..., Table 36 Table 36 to Subpart UUU of Part 63—Work Practice Standards for HAP Emissions From Bypass Lines...

  13. 40 CFR Table 34 to Subpart Uuu of... - Continuous Compliance With HAP Emission Limits for Sulfur Recovery Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With HAP Emission Limits for Sulfur Recovery Units 34 Table 34 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 34 Table 34 to Subpart UUU of Part 63—Continuous Compliance With HAP Emission Limits...

  14. 7 CFR Exhibit J to Subpart G of... - Locations and Telephone Numbers of Federal Emergency Management Administration's Regional Offices

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Locations and Telephone Numbers of Federal Emergency Management Administration's Regional Offices J Exhibit J to Subpart G of Part 1940 Agriculture Regulations of... REGULATIONS (CONTINUED) GENERAL Environmental Program Pt. 1940, Subpt. G, Exh. J Exhibit J to Subpart G of...

  15. 49 CFR Appendix C to Part 385 - Regulations Pertaining to Remedial Directives in Part 385, Subpart J

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Regulations Pertaining to Remedial Directives in Part 385, Subpart J C Appendix C to Part 385 Transportation Other Regulations Relating to...—Regulations Pertaining to Remedial Directives in Part 385, Subpart J § 395.1(h)(1)(i)Requiring or permitting a...

  16. 40 CFR Table 4 to Subpart IIIii of... - Work Practice Standards-Requirements for Mercury Liquid Collection

    Science.gov (United States)

    2010-07-01

    ... for Mercury Liquid Collection 4 Table 4 to Subpart IIIII of Part 63 Protection of Environment... Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII, Table 4 Table 4 to Subpart IIIII of Part 63—Work Practice Standards—Requirements for Mercury Liquid Collection As stated in...

  17. 40 CFR Appendix H to Subpart G of... - Substitutes Subject to Use Restrictions and Unacceptable Substitutes, Effective May 28, 1999

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Substitutes Subject to Use Restrictions and Unacceptable Substitutes, Effective May 28, 1999 H Appendix H to Subpart G of Part 82... STRATOSPHERIC OZONE Significant New Alternatives Policy Program Pt. 82, Subpt. G, App. H Appendix H to Subpart G...

  18. 7 CFR Appendix H to Subpart E of... - Suggested Format for the Opinion of the Lender's Legal Counsel

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Suggested Format for the Opinion of the Lender's Legal Counsel H Appendix H to Subpart E of Part 1980 Agriculture Regulations of the Department of Agriculture... Industrial Loan Program Pt. 1980, Subpt. E, App. H Appendix H to Subpart E of Part 1980—Suggested Format for...

  19. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Nonroad Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Nonroad Engines A Appendix A to Subpart F of Part 89 Protection of Environment... NONROAD COMPRESSION-IGNITION ENGINES Selective Enforcement Auditing Pt. 89, Subpt. F, App. A Appendix A to Subpart F of Part 89—Sampling Plans for Selective Enforcement Auditing of Nonroad Engines Table 1—Sampling...

  20. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Small Nonroad Engines A Appendix A to Subpart F of Part 90 Protection of Environment...-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Selective Enforcement Auditing Pt. 90, Subpt. F, App. A Appendix A to Subpart F of Part 90—Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines...

  1. 40 CFR Appendix A to Subpart G of... - Sampling Plans for Selective Enforcement Auditing of Marine Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...

  2. 40 CFR Table 5 to Subpart Jj of... - List of VHAP of Potential Concern Identified by Industry

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false List of VHAP of Potential Concern Identified by Industry 5 Table 5 to Subpart JJ of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION.... 63, Subpt. JJ, Table 5 Table 5 to Subpart JJ of Part 63—List of VHAP of Potential Concern Identified...

  3. 40 CFR Table 4 to Subpart Jj of... - Pollutants Excluded From Use in Cleaning and Washoff Solvents

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Pollutants Excluded From Use in Cleaning and Washoff Solvents 4 Table 4 to Subpart JJ of Part 63 Protection of Environment ENVIRONMENTAL... Operations Pt. 63, Subpt. JJ, Table 4 Table 4 to Subpart JJ of Part 63—Pollutants Excluded From Use in...

  4. 16 CFR Figure 4 to Subpart A of... - Flooring Radiant Panel Tester Schematic Low Flux End, Elevation

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Flooring Radiant Panel Tester Schematic Low Flux End, Elevation 4 Figure 4 to Subpart A of Part 1209 Commercial Practices CONSUMER PRODUCT SAFETY... Standard Pt. 1209, Subpt. A, Fig. 4 Figure 4 to Subpart A of Part 1209—Flooring Radiant Panel Tester...

  5. 40 CFR Table 2 to Subpart Wwww of... - Compliance Dates for New and Existing Reinforced Plastic Composites Facilities

    Science.gov (United States)

    2010-07-01

    ... Reinforced Plastic Composites Facilities 2 Table 2 to Subpart WWWW of Part 63 Protection of Environment...: Reinforced Plastic Composites Production Pt. 63, Subpt. WWWW, Table 2 Table 2 to Subpart WWWW of Part 63—Compliance Dates for New and Existing Reinforced Plastic Composites Facilities As required in §§ 63.5800 and...

  6. 10 CFR Appendix X to Subpart B of... - Uniform Test Method for Measuring the Energy Consumption of Dehumidifiers

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Uniform Test Method for Measuring the Energy Consumption of Dehumidifiers X Appendix X to Subpart B of Part 430 Energy DEPARTMENT OF ENERGY ENERGY... Appendix X to Subpart B of Part 430—Uniform Test Method for Measuring the Energy Consumption of...

  7. 13 CFR 123.603 - What is the interest rate on an economic injury disaster loan under this subpart?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What is the interest rate on an... September 11, 2001 Terrorist Attacks § 123.603 What is the interest rate on an economic injury disaster loan under this subpart? Your economic injury disaster loan under this subpart will have an interest rate of...

  8. 40 CFR 63.6092 - Are duct burners and waste heat recovery units covered by subpart YYYY?

    Science.gov (United States)

    2010-07-01

    ... Combustion Turbines What This Subpart Covers § 63.6092 Are duct burners and waste heat recovery units covered by subpart YYYY? No, duct burners and waste heat recovery units are considered steam generating units... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Are duct burners and waste heat...

  9. 40 CFR Table 1 to Subpart Kkkk of... - Nitrogen Oxide Emission Limits for New Stationary Combustion Turbines

    Science.gov (United States)

    2010-07-01

    ... Stationary Combustion Turbines 1 Table 1 to Subpart KKKK of Part 60 Protection of Environment ENVIRONMENTAL... Standards of Performance for Stationary Combustion Turbines Pt. 60, Subpt. KKKK, Table 1 Table 1 to Subpart KKKK of Part 60—Nitrogen Oxide Emission Limits for New Stationary Combustion Turbines Combustion...

  10. 40 CFR Table 4 to Subpart Jjj of... - Class II Emission Limits for Existing Small Municipal Waste Combustion Unitsa

    Science.gov (United States)

    2010-07-01

    ... Small Municipal Waste Combustion Unitsa 4 Table 4 to Subpart JJJ of Part 62 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Pt. 62, Subpt. JJJ, Table 4 Table 4 to Subpart JJJ of Part 62—Class II Emission Limits for Existing Small Municipal Waste Combustion Unitsa ER31JA03.009...

  11. 40 CFR Table 2 to Subpart Jjj of... - Class I Emission Limits for Existing Small Municipal Waste Combustion Limits

    Science.gov (United States)

    2010-07-01

    ... Small Municipal Waste Combustion Limits 2 Table 2 to Subpart JJJ of Part 62 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Pt. 62, Subpt. JJJ, Table 2 Table 2 to Subpart JJJ of Part 62—Class I Emission Limits for Existing Small Municipal Waste Combustion Limits ER31JA03.006...

  12. 15 CFR Appendix E to Subpart M of... - Motorized Personal Watercraft Zones and Access Routes Within the Sanctuary

    Science.gov (United States)

    2010-01-01

    ... and Access Routes Within the Sanctuary E Appendix E to Subpart M of Part 922 Commerce and Foreign... ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Monterey Bay National Marine Sanctuary Pt. 922, Subpt. M, App. E Appendix E to Subpart M of Part...

  13. 15 CFR Appendix A to Subpart H of... - Gulf of the Farallones National Marine Sanctuary Boundary Coordinates

    Science.gov (United States)

    2010-01-01

    ... Sanctuary Boundary Coordinates A Appendix A to Subpart H of Part 922 Commerce and Foreign Trade Regulations..., DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Gulf of the Farallones National Marine Sanctuary Pt. 922, Subpt. H, App. A Appendix A to Subpart H of...

  14. 40 CFR Table 6 to Subpart IIIii of... - Examples of Techniques for Equipment Problem Identification, Leak Detection and Mercury Vapor

    Science.gov (United States)

    2010-07-01

    ... Problem Identification, Leak Detection and Mercury Vapor 6 Table 6 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII..., Leak Detection and Mercury Vapor As stated in Tables 1 and 2 of Subpart IIIII, examples of techniques...

  15. 78 FR 63974 - Student Assistance General Provisions-Subpart K-Cash Management; Extension of Public Comment...

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF EDUCATION Student Assistance General Provisions--Subpart K--Cash Management... an information collection entitled, ``Student Assistance General Provisions--Subpart K--Cash Management''. ED is extending the comment period to November 18, 2013 due to the public's inability to access...

  16. 40 CFR 62.15020 - Can my small municipal waste combustion unit be exempt from this subpart?

    Science.gov (United States)

    2010-07-01

    ...) Municipal waste combustion units that combust only tires. Your unit is exempt from this subpart if three requirements are met: (1) Your municipal waste combustion unit combusts a single-item waste stream of tires and...) Plastics/rubber recycling units. Your unit is exempt from this subpart if four requirements are met: (1...

  17. Affected in the nightclub

    DEFF Research Database (Denmark)

    Demant, Jakob Johan

    2013-01-01

    simultaneously with the affects of love, joy, sympathy and so on. Alcohol, illicit drugs, bouncers, music and other human or non-human actants are part of the place. It is within this heterogeneous assemblage that affects become embodied. The data consists of 273 cases from a large Copenhagen nightclub where...

  18. 7 CFR Exhibit M to Subpart G of... - Implementation Procedures for the Conservation of Wetlands and Highly Erodible Land Affecting...

    Science.gov (United States)

    2010-01-01

    ... (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM... sedimentation; improve water quality; assist in preserving the Nation's wetlands; create better habitat for fish...

  19. 40 CFR Table 3 to Subpart Mmmmm of... - Performance Test Requirements for New or Reconstructed Flame Lamination Affected Sources

    Science.gov (United States)

    2010-07-01

    ... data only required for venturi scrubbers) every 15 minutes during the entire duration of each 1-hour... (pressure drop data only required for Venturi scrubbers) over the period of the performance test by... liquid flow rate, scrubber effluent pH, and pressure drop (pressure drop data only required for venturi...

  20. 40 CFR Table 2 to Subpart Mmmmm of... - Operating Limits for New or Reconstructed Flame Lamination Affected Sources

    Science.gov (United States)

    2010-07-01

    ... scrubber, maintain the daily average pressure drop across the venturi within the operating range value... . . . You must . . . 1. Scrubber a. Maintain the daily average scrubber inlet liquid flow rate above the minimum value established during the performance test. b. Maintain the daily average scrubber effluent pH...

  1. Affectivity and race

    DEFF Research Database (Denmark)

    on the role of feelings in the formation of subjectivities, how race and whiteness are affectively circulated in public life and the ways in which emotions contribute to regimes of inclusion and exclusion. As such it will appeal to scholars across the social sciences, with interests in sociology, anthropology...... of the Nordic countries, Affectivity and Race draws on a variety of sources, including television programmes, news media, fictional literature, interviews, ethnographic observations, teaching curricula and policy documents, to explore the ways in which ideas about affectivity and emotion afford new insights...

  2. Dementia in affective disorder

    DEFF Research Database (Denmark)

    Kessing, L V; Olsen, E W; Mortensen, P B

    1999-01-01

    OBJECTIVE: The aim of the study was to investigate whether patients with affective disorder have increased risk of developing dementia compared to other groups of psychiatric patients and compared to the general population. METHOD: In the Danish psychiatric central register, 3363 patients...... with unipolar affective disorder, 518 patients with bipolar affective disorder, 1025 schizophrenic and 8946 neurotic patients were identified according to the diagnosis at the first ever discharge from psychiatric hospital during the period from 1970 to 1974. The rate of discharge diagnosis of dementia...... on readmission was estimated during 21 years of follow-up. In addition, the rates were compared with the rates for admission to psychiatric hospitals with a discharge diagnosis of dementia for the total Danish population. RESULTS: Patients with unipolar and with bipolar affective disorder had a greater risk...

  3. Recurrence in affective disorder

    DEFF Research Database (Denmark)

    Kessing, L V; Olsen, E W; Andersen, P K

    1999-01-01

    The risk of recurrence in affective disorder is influenced by the number of prior episodes and by a person's tendency toward recurrence. Newly developed frailty models were used to estimate the effect of the number of episodes on the rate of recurrence, taking into account individual frailty toward...... recurrence. The study base was the Danish psychiatric case register of all hospital admissions for primary affective disorder in Denmark during 1971-1993. A total of 20,350 first-admission patients were discharged with a diagnosis of major affective disorder. For women with unipolar disorder and for all...... kinds of patients with bipolar disorder, the rate of recurrence was affected by the number of prior episodes even when the effect was adjusted for individual frailty toward recurrence. No effect of episodes but a large effect of the frailty parameter was found for unipolar men. The authors concluded...

  4. Seasonal Affective Disorder

    Science.gov (United States)

    ... cravings and weight gain Thoughts of death or suicide SAD is more common in women, young people, ... of serotonin, a brain chemical that affects your mood. Their bodies also make too ... with light therapy. NIH: National Institute of Mental Health

  5. Affectivity and race

    DEFF Research Database (Denmark)

    Vitus, Kathrine; Andreassen, Rikke

    into the experience of racial difference and the unfolding of political discourses on race in various social spheres. Organised around the themes of the politicisation of race through affect, the way that race produces affect and the affective experience of race, this interdisciplinary collection sheds light...... on the role of feelings in the formation of subjectivities, how race and whiteness are affectively circulated in public life and the ways in which emotions contribute to regimes of inclusion and exclusion. As such it will appeal to scholars across the social sciences, with interests in sociology, anthropology......This book presents new empirical studies of social difference in the Nordic welfare states, in order to advance novel theoretical perspectives on the everyday practices and macro-politics of race and gender in multi-ethnic societies. With attention to the specific political and cultural landscapes...

  6. How culture affects management?

    OpenAIRE

    Billi, Lorena

    2012-01-01

    The study is about how culture affects management. Culture can have many different meanings. Management has also many different ways to be approached. While doing research about cultures, the study will try to analyze how the culture affects the management. The study starts with a full explanation of the meaning of culture. Some previous analysis and studies are added to illustrate my study on the subject. The effect culture has on management is studied at different levels. The study does not...

  7. 49 CFR Appendix A to Subpart H of... - Service Request Form

    Science.gov (United States)

    2010-10-01

    ... INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) Pt. 37, Subpt. H, App. A Appendix A to Subpart... Service 1. Operator's name 2. Address 3. Phone number: 4. Passenger's name: 5. Address: 6. Phone number: 7... bus or equivalent service, as applicable: 10. Was accessible bus or equivalent service, as applicable...

  8. 49 CFR Schedule G to Subpart B of... - Selected Statistical Data

    Science.gov (United States)

    2010-10-01

    ..., L. 12, col. (b) 26Total passenger revenue Sch. 9002, L. 16, col. (b) 27Passenger-miles per bus mile... PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. G Schedule G to Subpart B of Part 1139—Selected.... (b) 2Special bus revenue Sch. 2998, L. 2, col. (b) 3Express revenue Sch. 2998, L. 5, col. (b) 4Total...

  9. 40 CFR Appendix I to Subparts D and E - Motorcycle Noise Emission Test Procedures [Note

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Motorcycle Noise Emission Test... (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles Recall of noncomplying motorcycles; relabeling of mislabeled motorcycles. Appendix I to Subparts D and E—Motorcycle Noise...

  10. 47 CFR Figure 4 to Subpart N of... - Example of EPIRB Carrier Component

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Example of EPIRB Carrier Component 4 Figure 4 to Subpart N of Part 2 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL FREQUENCY...—Example of EPIRB Carrier Component EC03JN91.008 ...

  11. 20 CFR 10.900 - What is the death gratuity under this subpart?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false What is the death gratuity under this subpart? 10.900 Section 10.900 Employees' Benefits OFFICE OF WORKERS' COMPENSATION PROGRAMS, DEPARTMENT OF... is a FECA benefit, as defined by § 10.5(a) of this part. All the provisions and definitions in this...

  12. 40 CFR 63.2131 - Am I subject to this subpart?

    Science.gov (United States)

    2010-07-01

    ... purpose of becoming an ingredient in dough for bread or any other yeast-raised baked product, or for... Standards for Hazardous Air Pollutants: Manufacturing of Nutritional Yeast What This Subpart Covers § 63... nutritional yeast manufacturing facility that is, is located at, or is part of a major source of hazardous air...

  13. 40 CFR 63.11132 - What definitions apply to this subpart?

    Science.gov (United States)

    2010-07-01

    ... supersede definitions in other parts or subparts. Dual-point vapor balance system means a type of vapor balance system in which the storage tank is equipped with an entry port for a gasoline fill pipe and a.... Bottom filling of gasoline storage tanks is included in this definition. Vapor balance system means a...

  14. 40 CFR Table 6 to Subpart Vvvv of... - Default Organic HAP Contents of Petroleum Solvent Groups

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Default Organic HAP Contents of... Manufacturing Pt. 63, Subpt. VVVV, Table 6 Table 6 to Subpart VVVV of Part 63—Default Organic HAP Contents of Petroleum Solvent Groups As specified in § 63.5758(a)(6), when detailed organic HAP content data for solvent...

  15. 40 CFR Table 2 to Subpart II of... - Volatile Organic HAP (VOHAP) Limits for Marine Coatings

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Volatile Organic HAP (VOHAP) Limits... (Surface Coating) Pt. 63, Subpt. II, Table 2 Table 2 to Subpart II of Part 63—Volatile Organic HAP (VOHAP...) through (4). b VOC (including exempt compounds listed as HAP) shall be used as a surrogate for VOHAP for...

  16. 30 CFR Appendix I to Subpart M of... - National Consensus Standards

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false National Consensus Standards I Appendix I to... Machinery and Equipment Pt. 56, Subpt. M, App. I Appendix I to Subpart M of Part 56—National Consensus... object protective structures (FOPS) may consult the following national consensus standards, as applicable...

  17. 40 CFR Table 1 to Subpart C - VOC Content Limits by Product Category

    Science.gov (United States)

    2010-07-01

    ... (weight-percent VOC) Air fresheners: Single-phase 70 Double-phase 30 Liquids/pump sprays 18 Solids/gels 3... 40 Protection of Environment 5 2010-07-01 2010-07-01 false VOC Content Limits by Product Category 1 Table 1 to Subpart C Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  18. 7 CFR Appendix E to Subpart E of... - Environmental Assessment Guidelines

    Science.gov (United States)

    2010-01-01

    ... Subpart E of Part 1980 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT... rangelands, endangered species habitats, or other delicate or rare ecosystems. Attach adequate location maps...

  19. 40 CFR Appendix B to Subpart Nnn... - Free Formaldehyde Analysis of Insulation Resins by Hydroxylamine Hydrochloride

    Science.gov (United States)

    2010-07-01

    ... Insulation Resins by Hydroxylamine Hydrochloride B Appendix B to Subpart NNN of Part 63 Protection of...—Free Formaldehyde Analysis of Insulation Resins by Hydroxylamine Hydrochloride 1. Scope This method was... hydrochloric acid that is liberated when hydroxylamine hydrochloride reacts with formaldehyde to form...

  20. 24 CFR 903.1 - What is the purpose of this subpart?

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT PUBLIC HOUSING AGENCY PLANS Deconcentration of Poverty and Fair Housing in Program... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false What is the purpose of this subpart? 903.1 Section 903.1 Housing and Urban Development Regulations Relating to Housing and Urban...

  1. 28 CFR Appendix to Subpart A - International Terrorism Victim Expense Reimbursement Program (ITVERP); Chart of Expense...

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false International Terrorism Victim Expense... Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Pt. 94, Subpt. A, App. Appendix to Subpart A—International Terrorism Victim Expense...

  2. 12 CFR 21.1 - Purpose and scope of subpart A of this part.

    Science.gov (United States)

    2010-01-01

    ....1 Section 21.1 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY MINIMUM... subpart is issued by the Comptroller of the Currency pursuant to section 3 of the Bank Protection Act of... office and branches (as the term “branch” is used in 12 U.S.C. 36). [56 FR 29564, June 28, 1991, as...

  3. 40 CFR Table 3 to Subpart Bbbbbb... - Applicability of General Provisions

    Science.gov (United States)

    2010-07-01

    ... maintenance plans, records, inspection Yes. § 63.6(g)(1)-(3) Alternative Standard Procedures for getting an... standard established; permit requirements; extensions, notifications Yes, specific requirements given in... permitting authority Yes, § 63.11081(b) of subpart BBBBBB exempts identified area sources from the obligation...

  4. 26 CFR 1.963-1 - Exclusion of subpart F income upon receipt of minimum distribution.

    Science.gov (United States)

    2010-04-01

    ... the extent of any interest (of such shareholder in any such corporation) with respect to which an... first-tier election may apply—(1) Includible interest. A corporate United States shareholder may make a... corporate shareholder may exclude from its gross income the subpart F income of a controlled foreign...

  5. 41 CFR 101-26.500 - Scope and applicability of subpart.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope and applicability of subpart. 101-26.500 Section 101-26.500 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  6. 41 CFR 101-26.600 - Scope and applicability of subpart.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope and applicability of subpart. 101-26.600 Section 101-26.600 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  7. 40 CFR Table 2 of Subpart Aaaaaaa... - Emission Limits for Asphalt Roofing Manufacturing (Coating) Operations

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 14 2010-07-01 2010-07-01 false Emission Limits for Asphalt Roofing Manufacturing (Coating) Operations 2 Table 2 of Subpart AAAAAAA of Part 63 Protection of Environment... AAAAAAA of Part 63—Emission Limits for Asphalt Roofing Manufacturing (Coating) Operations For * * * 1...

  8. 40 CFR 197.2 - What definitions apply in subpart A?

    Science.gov (United States)

    2010-07-01

    ... appendix A of this part. EPA means the Environmental Protection Agency. General environment means... 40 Protection of Environment 24 2010-07-01 2010-07-01 false What definitions apply in subpart A? 197.2 Section 197.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) RADIATION...

  9. 40 CFR 261.141 - Definitions of terms as used in this subpart.

    Science.gov (United States)

    2010-07-01

    ...) SOLID WASTES (CONTINUED) IDENTIFICATION AND LISTING OF HAZARDOUS WASTE Financial Requirements for Management of Excluded Hazardous Secondary Materials § 261.141 Definitions of terms as used in this subpart... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Definitions of terms as used in this...

  10. 40 CFR 91.603 - Applicability of part 91, subpart F.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Applicability of part 91, subpart F. 91.603 Section 91.603 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... best of (Company Name) knowledge, true and accurate. I am aware of the penalties associated with...

  11. 40 CFR Appendix III to Subpart S... - As-Received Inspection

    Science.gov (United States)

    2010-07-01

    ...) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light... Reading 7. Build Date 8. MIL light on/off status 9. Readiness code status 10. Stored OBD codes 11.Any conditions referenced in appendix II to this subpart which result in vehicle being rejected from program. ...

  12. 7 CFR Exhibit D to Subpart B of... - Hearings/Review Officer Designations

    Science.gov (United States)

    2010-01-01

    ... Subpart B of Part 1900 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS GENERAL Adverse Decisions and Administrative Appeals Pt. 1900...

  13. 7 CFR Exhibit A to Subpart I of... - Self-Help Technical Assistance Grant Agreement

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE... rights under 7 CFR part 1900, subpart B. (f) An extension of this grant agreement may be approved by FmHA... value from suppliers, contractors, or others doing business with the grantee. To the extent permissible...

  14. 22 CFR 212.25 - Procedures for obtaining materials under this subpart.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procedures for obtaining materials under this subpart. 212.25 Section 212.25 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT PUBLIC INFORMATION Availability of Information for Public Inspection and Copying § 212.25 Procedures for obtaining materials under...

  15. 29 CFR 1926.650 - Scope, application, and definitions applicable to this subpart.

    Science.gov (United States)

    2010-07-01

    ... to include trenches. (b) Definitions applicable to this subpart. Accepted engineering practices means those requirements which are compatible with standards of practice required by a registered professional engineer. Aluminum Hydraulic Shoring means a pre-engineered shoring system comprised of aluminum hydraulic...

  16. 7 CFR Appendix to Subpart A of... - List of Federal Financial Assistance From USDA

    Science.gov (United States)

    2010-01-01

    ... Food Security Act of 1985 (7 U.S.C. 1281 et seq.). 7. Human Nutrition 7 CFR 3015.205(b); Department of... 7 Agriculture 1 2010-01-01 2010-01-01 false List of Federal Financial Assistance From USDA Appendix to Subpart A of Part 15 Agriculture Office of the Secretary of Agriculture NONDISCRIMINATION...

  17. 40 CFR Table 7 to Subpart Zzzz of... - Requirements for Reports

    Science.gov (United States)

    2010-07-01

    ... Subpart ZZZZ of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS.... Semiannually according to the requirements in § 63.6650(b). 2. Report a. The fuel flow rate of each fuel and.... See item 2.a.i. c. Any problems or errors suspected with the meters i. See item 2.a.i. [75 FR 9687...

  18. 32 CFR Attachment B to Subpart B... - Standard B-Single Scope Background Investigation (SSBI)

    Science.gov (United States)

    2010-07-01

    ... (SSBI) B Attachment B to Subpart B of Part 147 National Defense Department of Defense OFFICE OF THE... FOR ACCESS TO CLASSIFIED INFORMATION Investigative Standards Pt. 147, Subpt. B, Att. B Attachment B to... Place of Birth: Corroboration of date and place of birth through a check of appropriate documentation; a...

  19. 23 CFR Appendix A to Subpart B of... - Guide Letter of Certification by State Engineer

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Guide Letter of Certification by State Engineer A Appendix A to Subpart B of Part 637 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... State Engineer Date Project No. This is to certify that: The results of the tests used in the acceptance...

  20. 21 CFR 111.16 - What are the requirements under this subpart C for written procedures?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What are the requirements under this subpart C for written procedures? 111.16 Section 111.16 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION CURRENT GOOD MANUFACTURING PRACTICE IN...