WorldWideScience

Sample records for storage hydro power

  1. Pumped Storage Hydro Power Plant Cierny Vah

    International Nuclear Information System (INIS)

    Regula, E.

    1998-01-01

    In this leaflet the pump-storage power plant Cierny Vah is presented. A Cierny Vah pumped storage power plant (PSP) has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system. (ES). It is mainly the pumped storage hydro power plants plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation by especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control, ...) gave way to dynamic functions which gained greater importance. After interconnection of the ES with the UCPTE West European Association in which there are besides other things, the strict criteria for observing balance outputs, the main functions of PSPs are as follows: (1) Dynamic services for ES; (2) Dispatching reserve for the fall out of the greatest ES block; (3) Observing the foreign cooperation balance agreed; (4) Compensation of peaks and also of sudden daily load diagram reductions. Technical parameters of the upper and lower reservoir are described. The hydro power plant is a body lower reservoir. In it there are six vertical pumping aggregates in the three machine layout: the motor-generator - the turbine - the pump. Between the turbine and the pump there is a hydraulically controlled claw clutch engaging at rest and disengaging also during the aggregate operation. During pumping air is involved inside the turbine. The Francis turbines have a

  2. Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant

    International Nuclear Information System (INIS)

    Regula, E.

    2005-01-01

    In this paper thirty years history of the Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant (PSPP) is presented. In 1975 year the Liptovska Mara PSPP was commissioned. There are 2 Kaplan turbines and 2 Derezias reversible turbines with a total installed power 198 MW. The average annual output is 134.5 GWh. As a part of this hydro-engineering structure is Besenova Small-scale power plants with 2 turbines and with installed power 4.64 MW. The average annual output consists 18.3 GWh. There up to end of 2004 year 3,620.172 MWh of electricity was produced. Environmental effects are discussed

  3. A long-term analysis of pumped hydro storage to firm wind power

    International Nuclear Information System (INIS)

    Foley, A.M.; Leahy, P.G.; Li, K.; McKeogh, E.J.; Morrison, A.P.

    2015-01-01

    Highlights: • This is a long term generation analysis of a high wind power system. • A high CO 2 and fossil fuel price is closest to Ireland’s EU ETS 2020 target. • New pumped storage to firm wind is limited unless strong market costs exist. • Reserve for wind power show that ancillary services are relevant for balancing. - Abstract: Although pumped hydro storage is seen as a strategic key asset by grid operators, financing it is complicated in new liberalised markets. It could be argued that the optimum generation portfolio is now determined by the economic viability of generators based on a short to medium term return on investment. This has meant that capital intensive projects such as pumped hydro storage are less attractive for wholesale electricity companies because the payback periods are too long. In tandem a significant amount of wind power has entered the generation mix, which has resulted in operating and planning integration issues due to wind’s inherent uncertain, varying spatial and temporal nature. These integration issues can be overcome using fast acting gas peaking plant or energy storage. Most analysis of wind power integration using storage to date has used stochastic optimisation for power system balancing or arbitrage modelling to examine techno-economic viability. In this research a deterministic dynamic programming long term generation expansion model is employed to optimise the generation mix, total system costs and total carbon dioxide emissions, and unlike other studies calculates reserve to firm wind power. The key finding of this study is that the incentive to build capital-intensive pumped hydro storage to firm wind power is limited unless exogenous market costs come very strongly into play. Furthermore it was demonstrated that reserve increases with increasing wind power showing the importance of ancillary services in future power systems

  4. Feasibility study and economic analysis of pumped hydro storage and battery storage for a renewable energy powered island

    International Nuclear Information System (INIS)

    Ma, Tao; Yang, Hongxing; Lu, Lin

    2014-01-01

    Highlights: • Batteries and pumped hydro storage schemes are examined. • Sizing procedure for each option is investigated in detail. • The two schemes are compared in terms of life cycle cost and technical viability. • Sensitivity analyses are conducted on five key input parameters. - Abstract: This study examined and compared two energy storage technologies, i.e. batteries and pumped hydro storage (PHS), for the renewable energy powered microgrid power supply system on a remote island in Hong Kong. The problems of energy storage for off-grid renewable energy were analyzed. The sizing methods and economic models were developed, and finally applied in the real project (case study). The results provide the most suitable energy storage scheme for local decision-makers. The two storage schemes were further divided into 4 options. Accordingly, the life-cycle costs (LCC), levelized costs for the renewable energy storage system (LCRES) and the LCC ratios between all options were calculated and compared. It was found that the employment of conventional battery (Option 2) had a higher LCC value than the advanced deep cycle battery (Option 1), indicating that using deep cycle batteries is more suitable for a standalone renewable power supply system. The pumped storage combined with battery bank option (Option 3) had only 55% LCC of that of Option 1, making this combined option more cost-competitive than the sole battery option. The economic benefit of pumped storage is even more significant in the case of purely pumped storage with a hydraulic controller (Option 4), with the lowest LCC among all options at 29–48% of Option 1. Sensitivity analysis demonstrates that PHS is even more cost competitive by controlling some adjustments such as increasing energy storage capacity and days of autonomy. Therefore, the renewable energy system coupled with pumped storage presents technically feasible opportunities and practical potential for continuous power supply in remote

  5. Effects of Scandinavian hydro power on storage needs in a fully renewable European power system for various transmission capacity scenarios

    Science.gov (United States)

    Kies, Alexander; Nag, Kabitri; von Bremen, Lueder; Lorenz, Elke; Heinemann, Detlev

    2015-04-01

    The penetration of renewable energies in the European power system has increased in the last decades (23.5% share of renewables in the gross electricity consumption of the EU-28 in 2012) and is expected to increase further up to very high shares close to 100%. Planning and organizing this European energy transition towards sustainable power sources will be one of the major challenges of the 21st century. It is very likely that in a fully renewable European power system wind and photovoltaics (pv) will contribute the largest shares to the generation mix followed by hydro power. However, feed-in from wind and pv is due to the weather dependant nature of their resources fluctuating and non-controllable. To match generation and consumption several solutions and their combinations were proposed like very high backup-capacities of conventional power generation (e.g. fossile or nuclear), storages or the extension of the transmission grid. Apart from those options hydro power can be used to counterbalance fluctuating wind and pv generation to some extent. In this work we investigate the effects of hydro power from Norway and Sweden on residual storage needs in Europe depending on the overlaying grid scenario. High temporally and spatially resolved weather data with a spatial resolution of 7 x 7 km and a temporal resolution of 1 hour was used to model the feed-in from wind and pv for 34 investigated European countries for the years 2003-2012. Inflow into hydro storages and generation by run-of-river power plants were computed from ERA-Interim reanalysis runoff data at a spatial resolution of 0.75° x 0.75° and a daily temporal resolution. Power flows in a simplified transmission grid connecting the 34 European countries were modelled minimizing dissipation using a DC-flow approximation. Previous work has shown that hydro power, namely in Norway and Sweden, can reduce storage needs in a renewable European power system by a large extent. A 15% share of hydro power in Europe

  6. Feasibility study of a Green Power Plant. Final report. [Offshore pumped hydro storage

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-03-15

    This project is a technical evaluation and a feasibility study of a concept called the Green Power Plant (GPP), developed by Seahorn Energy Aps. The Green Power Plant is an offshore pumped hydro storage facility constructed from prefabricated elements and with integrated renewable energy production. Pumped hydro storage is a known technology with a proven roundtrip energy storage efficiency of 80%. The focus of the GPP project is on simplifying and industrializing the construction of the reservoir wall, thereby achieving a cost efficient solution. The reservoir structure is dependent on the site on which the reservoir is established, thus Kriegers Flak in the Baltic Sea has been chosen as basis for the technical evaluation. As soil conditions vary, the technical evaluations have been based on a general soil profile. A water depth of 25m has been chosen as basis for the evaluation. A reservoir with a diameter of 2 km has been evaluated as baseline scenario. Feasibility of the GPP was evaluated based on the cost and income estimates. For the baseline scenario an internal rate of return of 6.6% was found for a period of 35 years. A sensitivity analysis reveals internal rates of return over 35 years varying from 4.9% to 10.9%. Especially larger reservoir diameters increase profitability of the GPP. The results from this project will be utilized in raising funds for further development of the GPP concept. Seahorn Energy Aps aims at optimizing the wind turbine integration, the steel pile wall structure and the pump-turbine integration in a future project towards construction of a demonstration facility. (LN)

  7. Optimal bidding in Turkey day ahead electricity market for wind energy and pumped storage hydro power plant

    Directory of Open Access Journals (Sweden)

    Ceyhun Yıldız

    2016-10-01

    Full Text Available In electrical grid; when the demand power increases energy prices increase, when the demand decreases energy prices decrease. For this reason; to increase the total daily income, it is required to shift generations to the hours that high demand power values occurred. Wind Power Plants (WPP have unstable and uncontrollable generation characteristic. For this reason, energy storage systems are needed to shift the generations of WPPs in time scale. In this study, four wind power plants (WPP which are tied to the Turkish interconnected grid and a pumped hydro storage power plant (PSPP that meets the energy storage requirement of these power plants are investigated in Turkey day ahead energy market. An optimization algorithm is developed using linear programming technique to maximize the day ahead market bids of these plants which are going to generate power together. When incomes and generations of the plants that are operated with optimization strategy is analyzed, it is seen that annual income increased by 2.737% compared with WPPs ‘s alone operation and generations are substantially shifted to the high demand power occurred hours.

  8. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  9. Pumping station design for a pumped-storage wind-hydro power plant

    International Nuclear Information System (INIS)

    Anagnostopoulos, John S.; Papantonis, Dimitris E.

    2007-01-01

    This work presents a numerical study of the optimum sizing and design of a pumping station unit in a hybrid wind-hydro plant. The standard design that consists of a number of identical pumps operating in parallel is examined in comparison with two other configurations, using one variable-speed pump or an additional set of smaller jockey pumps. The aim is to reduce the amount of the wind generated energy that cannot be transformed to hydraulic energy due to power operation limits of the pumps and the resulting step-wise operation of the pumping station. The plant operation for a period of one year is simulated by a comprehensive evaluation algorithm, which also performs a detailed economic analysis of the plant using dynamic evaluation methods. A preliminary study of the entire plant sizing is carried out at first using an optimization tool based on evolutionary algorithms. The performance of the three examined pumping station units is then computed and analyzed in a comparative study. The results reveal that the use of a variable-speed pump constitutes the most effective and profitable solution, and its superiority is more pronounced for less dispersed wind power potential

  10. Optimal operation of a pumped-storage hydro plant that compensates the imbalances of a wind power producer

    OpenAIRE

    Duque, Álvaro Jaramillo; Castronuovo, Edgardo D.; Sánchez, Ismael; Usaola, Julio

    2011-01-01

    The participation of wind energy in electricity markets requires providing a forecast for future energy production of a wind generator, whose value will be its scheduled energy. Deviations from this schedule because of prediction errors could imply the payment of imbalance costs. In order to decrease these costs, a joint operation between a wind farm and a hydro-pump plant is proposed; the hydro-pump plant changes its production to compensate wind power prediction errors. In order to optimize...

  11. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  12. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    Energy Technology Data Exchange (ETDEWEB)

    Huertas-Hernando, Daniel [Department of Energy Systems, SINTEF, Trondheim Norway; Farahmand, Hossein [Department of Electric Power Engineering, Norwegian University of Science and Technology (NTNU), Trondheim Norway; Holttinen, Hannele [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Kiviluoma, Juha [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Rinne, Erkka [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Söder, Lennart [Department of Electrical Engineering, KTH University, Stockholm Sweden; Milligan, Michael [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Ibanez, Eduardo [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Martínez, Sergio Martín [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Gomez-Lazaro, Emilio [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Estanqueiro, Ana [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Rodrigues, Luis [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Carr, Luis [Research Association for Energy Economics (FfE GmbH), Munich Germany; van Roon, Serafin [Research Association for Energy Economics (FfE GmbH), Munich Germany; Orths, Antje Gesa [Energinet.dk, Fredericia Denmark; Eriksen, Peter Børre [Energinet.dk, Fredericia Denmark; Forcione, Alain [Hydro Quebec, Montréal Canada; Menemenlis, Nickie [Hydro Quebec, Montréal Canada

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.

  13. Coordination Between Wind Power, Hydro Storage Facility and Conventional Generating Units According to the Annual Growth Load

    Directory of Open Access Journals (Sweden)

    Shahrokh Shojaeean

    2013-04-01

    Full Text Available Considering the growing trend of the consumption of the electric power and the global tendency to substitute new renewable sources of energy, this paper proposes a Monte Carlo based method to determine an optimal level of this change. Considering the limitation of the wind farms in continuous supply of electric power, hydrostatic power storage facilities are used beside wind farms so that the electric power could be stored and fed in a continuous flow into power systems. Due to the gradual exclusion of conventional generators and 5 percent annual load increments, LOLE index was used in order to calculate the amount of the wind power and the capacity of the necessary power storage facility. To this end, LOLE index was calculated for the first year as the reference index for the estimation of the amount of wind power and the capacity of the storage facility in consequent years. For the upcoming years, calculations have been made to account for the gradual exclusion of conventional generators in proportion to load increments. The proposed method has been implemented and simulated on IEEE-RTS test system.

  14. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  15. Nuclear power at Ontario Hydro

    International Nuclear Information System (INIS)

    Tapon, F.; Osborne, T.J.

    1980-01-01

    This case study shows that the diffusion of nuclear power in the electric public utility industry in Canada approximates the logistic growth curve, in agreement with previous results on technological innovation diffusion in the U.S. private sector. Many of the economic variables that affect this diffusion in the private sectors in the U.S. and Canada are also significant in the public sector in Canada. Too few utilities have adopted nuclear technology to permit using regression analysis to study the effect of environmental and regulatory factors on the growth of Ontario Hydro. Thus, cost-benefit analysis for each province might be more effective

  16. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  17. A Comparison of Off-Grid-Pumped Hydro Storage and Grid-Tied Options for an IRSOFC-HAWT Power Generator

    Directory of Open Access Journals (Sweden)

    Mahdi Majidniya

    2017-01-01

    Full Text Available An Internal Reforming Solid Oxide Fuel Cell (IRSOFC is modeled thermodynamically; a Horizontal Axis Wind Turbine (HAWT is designed; the combined IRSOFC-HAWT system should create a reliable source of electricity for the demand of a village located in Manjil, Iran. The output power of HAWT is unstable, but by controlling the fuel rate for the IRSOFC it is possible to have a stable power output from the combined system. When the electricity demand is over the peak or the wind speed is low/unstable/significantly high, the generated power may not be sufficient. To solve this problem, two scenarios are considered: connecting to the grid or using a Pumped Hydro Storage (PHS. For the second scenario, the extra produced electricity is saved when the production is more than demand and can be used when the extra power is needed. The economic analysis is done based on the economic conditions in Iran. The results will show a period of return about 9.5 and 13 years with the levelized cost of electricity about 0.0747 and 0.0882 $/kWh for the first and second scenarios, respectively. Furthermore, effects of some parameters such as the electricity price and the real interest rate are discussed.

  18. Market Power in Hydro-Thermal Supply

    International Nuclear Information System (INIS)

    Edin, Karl-Axel

    2006-12-01

    Despite having had a deregulated electricity market in Sweden for over ten years we still need to increase our understanding as to how deregulated electricity markets actually work and how possible problems are to be solved. One question that is always in focus is if the competition between generators in the Nordic electricity market really works the way it was intended. Many argue that the concentration in ownership of generation plants already has gone too far. Together with joint ownership in nuclear facilities and barriers for entrance, critics say that this has resulted in higher electricity prices than necessary. In this report different methods to (ex ante) study potential possibilities for generating firms to influence the electricity price (market power) and (ex post) discover possible manipulation through analysing the spot price and other observed factors on the electricity market are analysed. The purpose of the longer underlying paper is to give a comprehensive treatment of the electricity market with storage, i.e. hydro power, with an auction market organisation and to test the models on the Nordic market in order to explore the explanatory power of auction market theory and the theory of contestable market. The main theoretical effort in the paper concerns auction theory with inventories. The paper develops an inter-temporal auction model of a thermal-hydro power market. Parallel to the derivation of the basic equations a numerical model is developed in order to illustrate the results of the model. Section 2 of the present paper summarizes the basic equations (derived in the longer paper) for an inter-temporal auction thermal-hydro market. Section 3 contains the illustrations of solutions to equations for some stylized markets. In section 4 the auction model is tested on the Nordic market

  19. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  20. Optimal scheduling for distributed hybrid system with pumped hydro storage

    International Nuclear Information System (INIS)

    Kusakana, Kanzumba

    2016-01-01

    Highlights: • Pumped hydro storage is proposed for isolated hybrid PV–Wind–Diesel systems. • Optimal control is developed to dispatch power flow economically. • A case study is conducted using the model for an isolated load. • Effects of seasons on the system’s optimal scheduling are examined through simulation. - Abstract: Photovoltaic and wind power generations are currently seen as sustainable options of in rural electrification, particularly in standalone applications. However the variable character of solar and wind resources as well as the variable load demand prevent these generation systems from being totally reliable without suitable energy storage system. Several research works have been conducted on the use of photovoltaic and wind systems in rural electrification; however most of these works have not considered other ways of storing energy except for conventional battery storage systems. In this paper, an energy dispatch model that satisfies the load demand, taking into account the intermittent nature of the solar and wind energy sources and variations in demand, is presented for a hybrid system consisting of a photovoltaic unit, a wind unit, a pumped hydro storage system and a diesel generator. The main purpose of the developed model is to minimize the hybrid system’s operation cost while optimizing the system’s power flow considering the different component’s operational constraints. The simulations have been performed using “fmincon” implemented in Matlab. The model have been applied to two test examples; the simulation results are analyzed and compared to the case where the diesel generator is used alone to supply the given load demand. The results show that using the developed control model for the proposed hybrid system, fuel saving can be achieved compared to the case where the diesel is used alone to supply the same load patters.

  1. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  2. A Novel Pumped Hydro Combined with Compressed Air Energy Storage System

    Directory of Open Access Journals (Sweden)

    Erren Yao

    2013-03-01

    Full Text Available A novel pumped hydro combined with compressed air energy storage (PHCA system is proposed in this paper to resolve the problems of bulk energy storage in the wind power generation industry over an area in China, which is characterised by drought and water shortages. Thermodynamic analysis of the energy storage system, which focuses on the pre-set pressure, storage volume capacity, water air volume ratio, pump performance, and water turbine performance of the storage system, is also presented. This paper discovers how such parameters affect the performance of the whole system. The ideal performance of this novel system has the following advantages: a simple, highly effective and low cost structure, which is comparable to the efficiency of a traditional pumped hydro storage system. Research results show a great solution to the current storage constraints encountered in the development of the wind power industry in China, which have been widely recognised as a bottleneck in the wind energy storage industry.

  3. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  4. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  5. Hydro-electric power - potential and limitations

    International Nuclear Information System (INIS)

    Amundsen, T.

    1995-01-01

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world's growing population, the unavoidable conclusion is that more power is to be produced. 3 figs

  6. Hydro-electric power - potential and limitations

    Energy Technology Data Exchange (ETDEWEB)

    Amundsen, T.

    1995-12-31

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world`s growing population, the unavoidable conclusion is that more power is to be produced. 3 figs.

  7. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  8. Hybrid Hydro Renewable Energy Storage Model

    Science.gov (United States)

    Dey, Asit Kr

    2018-01-01

    This paper aims at presenting wind & tidal turbine pumped-storage solutions for improving the energy efficiency and economic sustainability of renewable energy systems. Indicated a viable option to solve problems of energy production, as well as in the integration of intermittent renewable energies, providing system flexibility due to energy load’s fluctuation, as long as the storage of energy from intermittent sources. Sea water storage energy is one of the best and most efficient options in terms of renewable resources as an integrated solution allowing the improvement of the energy system elasticity and the global system efficiency.

  9. An Overview of Power Topologies for Micro-hydro Turbines

    DEFF Research Database (Denmark)

    Nababan, Sabar; Muljadi, E.; Blaabjerg, Frede

    2012-01-01

    This paper is an overview of different power topologies of micro-hydro turbines. The size of micro-hydro turbine is typically under 100kW. Conventional topologies of micro-hydro power are stand-alone operation used in rural electrical network in developing countries. Recently, many of micro-hydro...... power generations are connected to the distribution network through power electronics (PE). This turbines are operated in variable frequency operation to improve efficiency of micro-hydro power generation, improve the power quality, and ride through capability of the generation. In this paper our...... discussion is limited to the distributed generation. Like many other renewable energy sources, the objectives of micro-hydro power generation are to reduce the use of fossil fuel, to improve the reliability of the distribution system (grid), and to reduce the transmission losses. The overview described...

  10. Hydro Power Reservoir Aggregation via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Markus Löschenbrand

    2017-12-01

    Full Text Available Electrical power systems with a high share of hydro power in their generation portfolio tend to display distinct behavior. Low generation cost and the possibility of peak shaving create a high amount of flexibility. However, stochastic influences such as precipitation and external market effects create uncertainty and thus establish a wide range of potential outcomes. Therefore, optimal generation scheduling is a key factor to successful operation of hydro power dominated systems. This paper aims to bridge the gap between scheduling on large-scale (e.g., national and small scale (e.g., a single river basin levels, by applying a multi-objective master/sub-problem framework supported by genetic algorithms. A real-life case study from southern Norway is used to assess the validity of the method and give a proof of concept. The introduced method can be applied to efficiently integrate complex stochastic sub-models into Virtual Power Plants and thus reduce the computational complexity of large-scale models whilst minimizing the loss of information.

  11. Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Ela, E.; Kirby, B.; Botterud, A.; Milostan, C.; Krad, I.; Koritarov, V.

    2013-05-01

    The most common form of utility- sized energy storage system is the pumped storage hydro system. Originally, these types of storage systems were economically viable simply because they displace more expensive generating units. However, over time, as those expensive units became more efficient and costs declined, pumped hydro storage units no longer have the operational edge. As a result, in the current electricity market environment, pumped storage hydro plants are struggling. To offset this phenomenon, certain market modifications should be addressed. This paper will introduce some of the challenges faced by pumped storage hydro plants in today's markets and purpose some solutions to those problems.

  12. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  13. The dual hydro x nuclear power plants

    International Nuclear Information System (INIS)

    Borges, J.C.

    1984-01-01

    An our daily life in modern society becomes more and more dependent on electricity, supply of this kind of energy should not only be a part of a global energy policy, but also lay down rigorous criteria to garanty the market supply. Planning actions of the electrical sector are more sensitive to unforseen events, either to brief interruptions in energy supply or to non-equilibrium at any time of the excess of supply over demand. In this way, the cost factor although basic, does not lead to optimal solutions in decisions which involve options between different technologies and energy sources to generate electricity. In this paper, we analyse the above situation in the case of deciding between utilization of nuclear or hydro power plants to supply the Brazilian demande for electricity. Our final objective was the search for parameters which could lead us to better identify and understand the adroitness and mistakes of the Brazilian Nuclear Program. (Author) [pt

  14. A Novel Constant-Pressure Pumped Hydro Combined with Compressed Air Energy Storage System

    Directory of Open Access Journals (Sweden)

    Erren Yao

    2014-12-01

    Full Text Available As intermittent renewable energy is receiving increasing attention, the combination of intermittent renewable energy with large-scale energy storage technology is considered as an important technological approach for the wider application of wind power and solar energy. Pumped hydro combined with compressed air energy storage system (PHCA is one of the energy storage systems that not only integrates the advantages but also overcomes the disadvantages of compressed air energy storage (CAES systems and pumped hydro energy storage systems to solve the problem of energy storage in China’s arid regions. Aiming at the variable working conditions of PHCA system technology, this study proposes a new constant-pressure PHCA. The most significant characteristics of this system were that the water pump and hydroturbine work under stable conditions and this improves the working efficiency of the equipment without incurring an energy loss. In addition, the constant-pressure PHCA system was subjected to energy and exergy analysis, in expectation of exploring an attractive solution for the large-scale storage of existing intermittent renewable energy.

  15. Experience of pico/micro hydro based power generation

    Energy Technology Data Exchange (ETDEWEB)

    Murthy, S.S. [Indian Inst. of Technology, Delhi, New Delhi (India). Dept. of Electrical Engineering

    2010-07-01

    Although India has approximately 150,000 megawatts of hydro potential, only a small portion is tapped. There is also significant untapped hydro potential in many developing countries such as Nepal, Bhutan, Vietnam, Indonesia and regions in South America and Africa. Small-scale hydroelectric power systems with capacities of up to a few megawatts are eco-friendly and sustainable. They can be classified based on unit sizes as pico (u pto 10 kilowatts), micro (10-100 kilowatts) and mini (100 kilowatts to a few megawatts) hydro systems. Mini hydro systems are always grid connected while micro can be either grid connected or off grid. Pico is always off grid. In India, there are thousands of favorable sites in this range that should be tapped for distributed power generation to electrify local communities. This need is reflected by the global emphasis on distributed power generation as well as the Government of India's policy to promote this type of power generation. A working stand alone pico-hydro power generating system has been successfully installed in 5 sites in Karnataka. The purpose of the project was to demonstrate the technical, managerial and economic feasibility of setting up small hydro projects in remote hilly areas of Karnataka, India and its positive environmental impact. The presentation discussed the site selection criteria; installed sites of pico hydro; system description; parts of the system; the electric load controller; types of electronic load controllers; and a description of the unit and control scheme. tabs., figs.

  16. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  17. Design considerations, operating and maintenance experience with wet storage of Ontario Hydro's used fuel

    International Nuclear Information System (INIS)

    Frost, C.R.

    1989-01-01

    The characteristics of Ontario Hydro's fuel and at-reactor used fuel storage water pools (or used fuel bays) are described. There are two types of bay, known respectively as primary bays and auxiliary bays, used for at- reactor used fuel storage. Used fuel is discharged remotely from Ontario Hydro's reactors to the primary bays for initial storage and cooling. The auxiliary bays are used to receive and store fuel after its initial cooling in the primary bay, and provide additional storage capacity as needed. With on- power fueling of reactors, each reactor of greater than 500 MW(e) net discharges an average of 10 or more used fuel bundles to bay storage every full power day. The logistics of handling such large quantities of used fuel bundles (corresponding to about 300 te/year of uranium for a 4 unit station) present a challenge to designers and operators. The major considerations in used fuel bay design, including site- specific requirements, reliability and quality assurance, are discussed

  18. Collaborative Modular Pumped Hydro Energy Storage Design Study

    Energy Technology Data Exchange (ETDEWEB)

    Bibeault, Mark Leonide [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Roybal, Adam [Jemez Mountain Electric Cooperative, Inc., Hernandez, NM (United States); Bailey, Jr., Richard J. [Northern New Mexico College, Espanola, NM (United States)

    2017-09-29

    In May of 2017, Los Alamos National Laboratory (LANL) through the Applied Engineering Technology Division, Jemez Mountain Electric Cooperative Inc. (JMEC), and Northern New Mexico College (NNMC) agreed to enter into a small, joint, non-binding Modular Pumped Hydro (MPH) design study related to grid level energy storage to begin a process of collaboration. Los Alamos National Laboratory's mission is to solve national security challenges through scientific excellence. The mission of Northern New Mexico College is to ensure student success by providing access to affordable, community-based learning opportunities that meet the educational, cultural, and economic needs of the region. Jemez Mountain Electric Cooperative Inc. is the largest electric co-op in the State of New Mexico providing affordable and reliable electricity to customers in the five counties of Rio Arriba, Santa Fe, San Juan, McKinley and Sandoval.

  19. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  20. Decision making algorithms for hydro-power plant location

    CERN Document Server

    Majumder, Mrinmoy

    2013-01-01

    The present study has attempted to apply the advantage of neuro-genetic algorithms for optimal decision making in maximum utilization of natural resources. Hydro-power is one of the inexpensive, but a reliable source of alternative energy which is foreseen as the possible answer to the present crisis in the energy sector. However, the major problem related to hydro-energy is its dependency on location. An ideal location can produce maximum energy with minimum loss. Besides, such power-plant also requires substantial amount of land which is a precious resource nowadays due to the rapid and unco

  1. Micro-hydro power: reviewing an old concept

    Energy Technology Data Exchange (ETDEWEB)

    Alward, R.; Eisenbart, S.; Volkman, J.

    1979-01-01

    This informaion package has been prepared to respond to an increasing number of requests for information on micro-hydro systems. It contains a resource directory, which is an attempt to put the reader in contact with the literature, plans, people, and companies appropriate to needs. On a world-wide basis, small-scale, environmentally benign, mechanical, and electrical hydropower systems are common. These are the systems for individual homes, farm, and shop use and generally have power outputs less than 100 kW. For convenience in terminology, this scale of hydro power is referred to as micro-hydro. A decision tree is first presented followed by information on determining the suitability of th site, equipment, economics, sources for financial assistance, regulatory conflicts, cautions and suggestions for the Do-It-Yourselfer, and the Self-Installer, manufacturers and suppliers, and sources of professional services. An annotated bibliography of 16 references is provided. (MCW)

  2. Impact of Storage Technologies upon Power System Losses

    Directory of Open Access Journals (Sweden)

    DULAU Lucian Ioan

    2015-05-01

    Full Text Available The paper describes the main characteristics of storage technologies. The most important storage technologies are the batteries, hydrogen, pumped hydro, flywheels, compressed air, super-capacitors and superconducting magnetic devices. The storage technologies can be classified based on the function principle into electrochemical, mechanical and electromagnetic devices. The storage systems can also be classified based on their capacity to store power into short and long term devices. A power flow analysis is performed for the situation with and without a storage unit. The storage unit is inserted into the IEEE 14 bus test system.

  3. Valuing hydrological forecasts for a pumped storage assisted hydro facility

    Science.gov (United States)

    Zhao, Guangzhi; Davison, Matt

    2009-07-01

    SummaryThis paper estimates the value of a perfectly accurate short-term hydrological forecast to the operator of a hydro electricity generating facility which can sell its power at time varying but predictable prices. The expected value of a less accurate forecast will be smaller. We assume a simple random model for water inflows and that the costs of operating the facility, including water charges, will be the same whether or not its operator has inflow forecasts. Thus, the improvement in value from better hydrological prediction results from the increased ability of the forecast using facility to sell its power at high prices. The value of the forecast is therefore the difference between the sales of a facility operated over some time horizon with a perfect forecast, and the sales of a similar facility operated over the same time horizon with similar water inflows which, though governed by the same random model, cannot be forecast. This paper shows that the value of the forecast is an increasing function of the inflow process variance and quantifies how much the value of this perfect forecast increases with the variance of the water inflow process. Because the lifetime of hydroelectric facilities is long, the small increase observed here can lead to an increase in the profitability of hydropower investments.

  4. Fuzzy interpolation of hydro power sales data in Simulink

    DEFF Research Database (Denmark)

    Jantzen, Jan; Eliasson, B.

    1994-01-01

    The problem in this case study can be described as a multi-dimensional surface fit to a given set of data. The data are sales figures in MWH/H for a hydro-thermal power generation system. The data are incomplete and not totally reliable. A model with ten fuzzy rules fits the data with a total error...

  5. Environmental-impact assessment of hydro-power in Egypt

    International Nuclear Information System (INIS)

    Rashad, S.M.; Ismail, M.A.

    2000-01-01

    The environmental impact of energy production and use with the associated emissions of greenhouse gases, particularly CO 2 , has created much attention and growing concern at both national and international levels. In Egypt, efforts have been directed to incorporate the environment-protection issues within the overall planning of the energy sector, as appropriate to its national commitment and its techno-economic considerations. Over the past decade, 1985-1995, hydro-power had contributed between 28 and 22% of the total energy produced by Egyptian power-plants, while the contribution of the hydro capacity was between 32.4 and 21.5%. Many studies have been carried out on the impacts of the Aswan High Dam on various aspects of the environment. An objective evaluation of the Dam, based on 25 years of operational data, indicated that it has overall been positive even though it has contributed to some environmental problems. These problems, however, are significantly less than most people originally expected. This paper deals with the review and analysis of the detrimental effects of hydro-power in Egypt. An evaluation will be given of the emissions of greenhouse gases from the whole hydro-chain. (Author)

  6. Hydro to market green power at special prices

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1996-01-01

    A 600 kW grid-connected demonstration wind turbine at Ontario Place will provide green power to Toronto residents early in 1997. The joint venture project partners include publicly owned Ontario Hydro, Toronto Hydro and Natural Resources Canada. The power will be sold at a premium under arrangements yet to be announced. The green power pricing initiative would allow some customers to buy their electricity at a green price. The project could be a self-financing model for future renewable energy development. The Ontario Place turbine project will determine whether Toronto electricity customers want green power or electricity from nuclear and fossil stations, and could determine which type of generation should be built in the future

  7. Opportunities and barriers to pumped-hydro energy storage in the United States

    International Nuclear Information System (INIS)

    Yang, Chi-Jen; Jackson, Robert B.

    2011-01-01

    As concerns about global warming grow, societies are increasingly turning to the use of intermittent renewable energy resources, where energy storage becomes more and more important. Pumped-hydro energy storage (PHES) is the most established technology for utility-scale electricity storage. Although PHES has continued to be deployed globally, its development in the United States has largely been dormant since the 1990s. In recent years, however, there has been a revival of commercial interests in developing PHES facilities. In this paper we examine the historical development of PHES facilities in the United States, analyze case studies on the controversies of disputed projects, examine the challenges to and conflicting views of future development in the United States, and discuss new development activities and approaches. The main limiting factors for PHES appear to be environmental concerns and financial uncertainties rather than the availability of technically feasible sites. PHES developers are proposing innovative ways of addressing the environmental impacts, including the potential use of waste water in PHES applications. In some cases, a properly designed PHES system can even be used to improve water quality through aeration and other processes. Such new opportunities and the increasing need for greater energy storage may lead policymakers to reassess the potential of PHES in the United States, particularly for coupling with intermittent renewable energy sources such as wind and solar power. (author)

  8. Wind energy and Swiss hydro power

    International Nuclear Information System (INIS)

    Ott, W.; Baur, M.; Fritz, W.; Zimmer, Ch.; Feldmann, J.; Haubrich, H.-J.; Dany, G.; Schmoeller, H.; Hartmann, T.

    2004-01-01

    This report for the Swiss Federal Office of Energy (SFOE) examines the possibilities of using Switzerland's hydropower generation facilities as a means of control and as a capacity-reserve for a European power system that includes a considerable amount of wind-generated electricity. The aims of the study - the analysis of possible changes in power availability and of the relative importance of peak load compensation, economic optimisation potential for the use of Swiss hydropower and organisational aspects - are presented. Various methods for organising production timetables and trading are looked at, as are future developments in the European power market. Methods of assessment of the value of Swiss hydropower installations are discussed in detail and possibilities of increasing capacity are discussed. The report is concluded with recommendations on the participation of Swiss hydropower in the market for regulation energy and the development of associated strategies. Also, environmental aspects are examined and the influence of national wind-energy concepts are discussed

  9. Extraordinary repair in Madunice Hydro Power Plant

    International Nuclear Information System (INIS)

    Vrablik, R.; Zacik, P.

    2007-01-01

    A New Year did not begin very well for Madunice hydroelectric power plant. On 3 January, 2007 during operation, the TG 1 turbine set suffered sudden large impacts and inadmissible vibration of the machine while in the secondary regulation regime. The attending personnel had to shut down the turbine and discover the cause of the failure. The reinstatement of the TG 1 turbine was realised during 15 days in continual regime because TG 1 turbine is back-up power supply for the Bohunice NPP. (author)

  10. Pico hydro power for rural electrification in developing countries

    International Nuclear Information System (INIS)

    Maher, P.; Smith, N.P.A.; Williams, A.A.

    1998-01-01

    Pico hydro power is a renewable energy system which has the potential to provide millions of rural people world-wide with a cheap, sustainable source of electricity. The development of new, cost-reducing approaches, including local manufacture and implementation in developing countries, has increased the accessibility of this technology to large numbers of people. The new approaches are investigated and some of the present constraints to wider adoption of this technology are analysed. (Author)

  11. A good advertisement for hydro power

    International Nuclear Information System (INIS)

    Wood, J.

    1999-01-01

    The generation of hydroelectric power in Iceland continues to be a thriving business. Between 1996 and 2000, Landsvirkjun will increase its supply to customers by 50%: the additional power will be used by the expanding energy-intensive heavy industries. Although prices for construction and operation of industrial plant in Iceland are not always the lowest, the quality is said to be exceptionally high and this attracts outside investors. Iceland continues to uprate old generating plant and build new. Through Landsvirkjun all of Iceland's electricity comes from renewable sources: diesel and gas appear to have little future in Iceland. Nevertheless, Landsvirkjun does not have a total monopoly: permits for new developments are issued to suitable applicants and competition is likely to increase. (UK)

  12. World Energy Needs and Offshore Potential of hydro energy and pump storage

    International Nuclear Information System (INIS)

    Lemperiere, F.

    2008-09-01

    In 2008, 6,5 Billion people have an overall income of 50.000 Billion US $, use 10 Billion oil equivalent of primary energy, partly through 15.000 TWh of electric power. Most is used by 1 Billion people from industrialized countries, with 10.000 KWh/ year per capita at a cost of 10 cents per KWh, i.e. 1.000 $/year, 3 % of their income close to 30.000 $ per year. In the second half of the Century, we may hope that 10 Billion people will reach this average income per capita; with a better energetic efficiency but a larger share of it through electricity. The world Electricity needs may well be multiplied by 5 along the century. It is possible at a reasonable cost to transport electricity along thousands of Km but this is used only now for 1 %. It is possible to store electricity after generation (pumped storage plants between 2 lakes) but it is used now for only 1 %; energy storage is usually before electricity generation (fuel storage or lakes). But these two possibilities of storage of electricity after generation and long distance transport are the key of the future utilization of renewable energies. The key problem of wind and solar electricity is the intermittent supply and the relevant need of storage along 1 or 2 days. Without storage, wind and solar energies may be used one third of time and should be associated with much more fossil fuel power for two thirds. As fossil fuel power will be limited, wind and solar should be very limited. 2) With storage, wind and solar energies may be used over 80 % of time, much more than fossil fuel. For 10.000 TWh/year of wind energy, a 2 days storage requires a 55 TWh/storage. For 30.000 TWh/year of sun energy, a 16 hours storage requires a 55 TWh/storage. As some storage may be common and as there may be storage is some solar plants, the total storage need may be 80 to 100 TWh. It may be between two lakes: - Possibly 10 to 20 TWh between 2 onshore lakes, as for 2 TWh now (100 GW x 20 hours) - Possibly 10 to 20 TWh from

  13. Municipal water powers small hydro in California

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, C.W.

    1985-07-01

    The city council of San Luis Obispo, California approved a scheme in 1984 to install a hydropower plant into an existing water distribution network. The Stenner Canyon project is under construction on the site of an abandoned water treatment plant. A 750 kW Pelton turbine will be fed via a 20 km pipeline from the Salimas Reservoir. A remote telemetry system will control turbine output. The primary objectives are to generate extra power for the area and provide additional revenue for the city. Computer simulation helped hydraulics engineers design the system. Tax-exempt industrial development bonds will finance the $1.5 million project. 2 figures.

  14. Comparison of Ontario Hydro's performance with world power reactors - 1981

    International Nuclear Information System (INIS)

    Dumka, B.R.

    1982-04-01

    The performance of Ontario Hydro's CANDU reactors in 1981 is compared with that of 123 world nuclear power reactors rated at 500 MW(e) or greater. The report is based on data extracted from publications, as well as correspondence with a number of utilities. The basis used is the gross capacity factor, which is defined as gross unit generation divided by the perfect gross output for the period of interest. The lowest of the published turbine and generator design ratings is used to determine the perfect gross output, unless the unit has been proven capable of consistently exceeding this value. The first six reactors in the rankings were CANDU reactors operated by Ontario Hydro

  15. Gross greenhouse gas fluxes from hydro-power reservoir compared to thermo-power plants

    International Nuclear Information System (INIS)

    Santos, Marco Aurelio dos; Pinguelli Rosa, Luiz; Sikar, Bohdan; Sikar, Elizabeth; Santos, Ednaldo Oliveira dos

    2006-01-01

    This paper presents the findings of gross carbon dioxide and methane emissions measurements in several Brazilian hydro-reservoirs, compared to thermo power generation. The term 'gross emissions' means gas flux measurements from the reservoir surface without natural pre-impoundment emissions by natural bodies such as the river channel, seasonal flooding and terrestrial ecosystems. The net emissions result from deducting pre-existing emissions by the reservoir. A power dam emits biogenic gases such as CO 2 and CH 4 . However, studies comparing gas emissions (gross emissions) from the reservoir surface with emissions by thermo-power generation technologies show that the hydro-based option presents better results in most cases analyzed. In this study, measurements were carried in the Miranda, Barra Bonita, Segredo, Tres Marias, Xingo, and Samuel and Tucurui reservoirs, located in two different climatological regimes. Additional data were used here from measurements taken at the Itaipu and Serra da Mesa reservoirs. Comparisons were also made between emissions from hydro-power plants and their thermo-based equivalents. Bearing in mind that the estimated values for hydro-power plants include emissions that are not totally anthropogenic, the hydro-power plants studied generally posted lower emissions than their equivalent thermo-based counterparts. Hydro-power complexes with greater power densities (capacity/area flooded-W/m 2 ), such as Itaipu, Xingo, Segredo and Miranda, have the best performance, well above thermo-power plants using state-of-the-art technology: combined cycle fueled by natural gas, with 50% efficiency. On the other hand, some hydro-power complexes with low-power density perform only slightly better or even worse than their thermo-power counterparts

  16. Development of Dalaelven hydro power scheme in Sweden

    International Nuclear Information System (INIS)

    Kokko, Voitto; Hjerthen, Peter; Ingfaelt, Hans; Loewen, Karl-Erik; Sjoegren, Arne

    2015-01-01

    The Dalaelven hydro scheme is located in central Sweden. Fortum has in the scheme 50 dams and 35 hydro power plants producing 4 TWh energy with a capacity of 970 MW. The main reservoirs are Lake Siljan and Traengsletsjoen with Traengslet dam, the highest earth-filled dam in Sweden. Development of the hydro scheme started 1878 with construction of four power plants for industry until 1930. From 1931 to 1974 15 power plants were built for increasing electricity consumption. De-regulation of the energy market in 1990's and EU environmental targets in 2000's resulted in the rehabilitation of ten power plants between 1990 and 2014 with increased annual energy production of 377 GWh (29%) and capacity 124 MW (59%). This energy decreases the annual CO 2 emissions with 125918 tons in comparison to production of the same amount of energy by coal. In several cases the rehabilitation was made in new power houses, allowing the development of the layout and technology of civil structures, and use of state-of-art equipment. Sweden uses the green certificate system, and 235 GWh of the energy received this certificate. Other environmental benefits come from use of the environmentally friendly Kaplan turbines and construction of some new fish pass. There are further plans to increase the spillway capacity of Traengslet dam and to rehabilitate eight power plant units. The possibilities of obtaining the Environmental licences for the rehabilitations has became challenging in the past years and green certificates are nowadays agreed only for increased energy. (authors)

  17. Integration of Variable Speed Pumped Hydro Storage in Automatic Generation Control Systems

    Science.gov (United States)

    Fulgêncio, N.; Moreira, C.; Silva, B.

    2017-04-01

    Pumped storage power (PSP) plants are expected to be an important player in modern electrical power systems when dealing with increasing shares of new renewable energies (NRE) such as solar or wind power. The massive penetration of NRE and consequent replacement of conventional synchronous units will significantly affect the controllability of the system. In order to evaluate the capability of variable speed PSP plants participation in the frequency restoration reserve (FRR) provision, taking into account the expected performance in terms of improved ramp response capability, a comparison with conventional hydro units is presented. In order to address this issue, a three area test network was considered, as well as the corresponding automatic generation control (AGC) systems, being responsible for re-dispatching the generation units to re-establish power interchange between areas as well as the system nominal frequency. The main issue under analysis in this paper is related to the benefits of the fast response of variable speed PSP with respect to its capability of providing fast power balancing in a control area.

  18. Role of pump hydro in electric power systems

    Science.gov (United States)

    Bessa, R.; Moreira, C.; Silva, B.; Filipe, J.; Fulgêncio, N.

    2017-04-01

    This paper provides an overview of the expected role that variable speed hydro power plants can have in future electric power systems characterized by a massive integration of highly variable sources. Therefore, it is discussed the development of a methodology for optimising the operation of hydropower plants under increasing contribution from new renewable energy sources, addressing the participation of a hydropower plant with variable speed pumping in reserve markets. Complementarily, it is also discussed the active role variable speed generators can have in the provision of advanced frequency regulation services.

  19. Hybrid wind power balance control strategy using thermal power, hydro power and flow batteries

    OpenAIRE

    Gelažanskas, Linas; Baranauskas, Audrius; Gamage, Kelum A.A.; Ažubalis, Mindaugas

    2016-01-01

    The increased number of renewable power plants pose threat to power system balance. Their intermittent nature makes it very difficult to predict power output, thus either additional reserve power plants or new storage and control technologies are required. Traditional spinning reserve cannot fully compensate sudden changes in renewable energy power generation. Using new storage technologies such as flow batteries, it is feasible to balance the variations in power and voltage within very short...

  20. Dead battery? Wind power, the spot market, and hydro power interaction in the Nordic electricity market

    OpenAIRE

    Mauritzen, Johannes

    2011-01-01

    It is well established within both the economics and power system engineering literature that hydro power can act as a complement to large amounts of intermittent energy. In particular hydro power can act as a "battery" where large amounts of wind power are installed. In this paper I use simple distributed lag models with data from Denmark and Norway. I find that increased wind power in Denmark causes increased marginal exports to Norway and that this effect is larger during periods of net ex...

  1. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  2. Hydro and nuclear power for African less-carbon development

    Energy Technology Data Exchange (ETDEWEB)

    El-Gazzar, Mohamed; Ibrahim, Yassin Mohamed; Bedrous, Maher Aziz

    2007-07-01

    Though the overall picture reveal availability of enormous energy resources which far exceed energy requirements of Africa, most of these resources are grossly underutilized, particularly hydro and nuclear resources. It suggests that Africa's problem is not lack of energy resources but its development and utilization. The region will remain a major net exporter of energy for several decades to com. In dealing with its energy problems Africa faces a unique set of initial conditions, defined mainly by its level and pattern of economic growth, social and demographic characteristics, energy resource endowment, location distances between supply sources and consumption areas, technological underdevelopment, and poverty-driven energy-environment conflict. A key challenge is the optimal utilization of the Africa's energy resources to facilitate both individual country and regional energy and economic development. Stronger emphasis on a more integrated energy supply network based on more widespread regional initiatives, particularly in electricity is essential to sustainable energy development in Africa. This paper discusses the prospects for hydro and nuclear power in Africa. The continent is the poorest in the world. The lack of reliable, accessible and affordable energy hinders its development. Hydro and nuclear power promises to be the least-carbon energy sources, while being the cheapest and most reliable among all. The role the hydropower can play in securing a sustainable energy future for Africa is highly emphasized. Also, nuclear power has many advantages to Africa. Opportunities for hydropower and nuclear power in Africa are all considered. Advantages and disadvantages are also all discussed. (auth)

  3. Power Management Based Current Control Technique for Photovoltaic-Battery Assisted Wind-Hydro Hybrid System

    Science.gov (United States)

    Ram Prabhakar, J.; Ragavan, K.

    2013-07-01

    This article proposes new power management based current control strategy for integrated wind-solar-hydro system equipped with battery storage mechanism. In this control technique, an indirect estimation of load current is done, through energy balance model, DC-link voltage control and droop control. This system features simpler energy management strategy and necessitates few power electronic converters, thereby minimizing the cost of the system. The generation-demand (G-D) management diagram is formulated based on the stochastic weather conditions and demand, which would likely moderate the gap between both. The features of management strategy deploying energy balance model include (1) regulating DC-link voltage within specified tolerances, (2) isolated operation without relying on external electric power transmission network, (3) indirect current control of hydro turbine driven induction generator and (4) seamless transition between grid-connected and off-grid operation modes. Furthermore, structuring of the hybrid system with appropriate selection of control variables enables power sharing among each energy conversion systems and battery storage mechanism. By addressing these intricacies, it is viable to regulate the frequency and voltage of the remote network at load end. The performance of the proposed composite scheme is demonstrated through time-domain simulation in MATLAB/Simulink environment.

  4. Global analysis of a renewable micro hydro power generation plant

    Science.gov (United States)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  5. Frequency Regulation of a Hybrid Wind–Hydro Power Plant in an Isolated Power System

    Directory of Open Access Journals (Sweden)

    Guillermo Martínez-Lucas

    2018-01-01

    Full Text Available Currently, some small islands with high wind potential are trying to reduce the environmental and economic impact of fossil fuels by using renewable resources. Nevertheless, the characteristics of these renewable resources negatively affect the quality of the electrical energy, causing frequency disturbances, especially in isolated systems. In this study, the combined contribution to frequency regulation of variable speed wind turbines (VSWT and a pump storage hydropower plant (PSHP is analyzed. Different control strategies, using the kinetic energy stored in the VSWT, are studied: inertial, proportional, and their combination. In general, the gains of the VSWT controller for interconnected systems proposed in the literature are not adequate for isolated systems. Therefore, a methodology to adjust the controllers, based on exhaustive searches, is proposed for each of the control strategies. The control strategies and methodology have been applied to a hybrid wind–hydro power plant on El Hierro Island in the Canary archipelago. At present, in this isolated power system, frequency regulation is only provided by the PSHP and diesel generators. The improvements in the quality of frequency regulation, including the VSWT contribution, have been proven based on simulating different events related to wind speed, or variations in the power demand.

  6. Sustainability Challenge of Micro Hydro Power Development in Indonesia

    Science.gov (United States)

    Didik, H.; Bambang, P. N.; Asep, S.; Purwanto, Y. A.

    2018-05-01

    Rural electrification using renewable energy is the best choice for many locations that far away from national grid. Many renewable energy project have been built for rural electrification such as micro hydro power plant (MHPP) and solar photovoltaic (SPV). Sustainability still the main challenge of off-grid renewable energy development for off-grid rural electrification in Indonesia. The objective of this paper is to review sustainability of micro hydro power development in Indonesia. The research method was done by field observation, interview with MHPP management, and reviewing some research about MHPP in Indonesia. Sustainability issues include various aspects that can be classified into 5 dimensions: technical, economic, socio-cultural, institutional, and environmental. In technical factors that lead to sustainability problem are: improper MHPP design and construction, improper operation and maintenance, availability of spare parts and expertise. In the economic dimension are generally related to: low electricity tariff and utilization of MHPP for productive use. In the social dimension are: the growth of consumer’s load exceeding the capacity, reduced number of consumers, lack of external institutional support. In the institutional side, it is generally related to the ability of human resources in managing, operating and maintaining of MHPP. Environmental factors that lead the sustainability problems of MHPP are: scarcity of water discharge, conflict of water resources, land conversion over the watershed, and natural disasters.

  7. Distributed power in Afghanistan: The Padisaw micro-hydro project

    International Nuclear Information System (INIS)

    Hallett, Michael

    2009-01-01

    The provision of electricity is a vital need in reconstruction and development situations, like that in Afghanistan. Indeed, according to the Afghan government's Afghan National Development Strategy (ANDS) the need for electricity featured in 80% of the Provincial Development Plans as a top priority. With the help of the International Community, the government of Afghanistan is attempting to develop a new market oriented approach to the nationwide provision of electrical power. Although the bulk of the electrification effort is directed toward large scale construction of a national grid, the ANDS explicitly mentions a role for 'micro-hydro, solar, waste and small scale diesel power and energy generating sources'. This article will describe a micro-hydro project in Padisaw village, in the Nurgaram district of Nuristan province located in Northeastern Afghanistan and the role Provincial Reconstruction Team played in working with the local community through the project planning and building processes and offer some observation on how, as the Afghan National Development Strategy is executed, the private sector can play an increasingly significant role in the Afghan distributed energy arena. (author)

  8. Modelling of hydro and wind power in the regulation market

    International Nuclear Information System (INIS)

    Kiviluoma, J.; Holttinen, H.; Meibom, P.

    2006-01-01

    The amount of required regulation capacity in the power system is affected by the wind power prediction errors. A model has been developed which can evaluate the monetary effects of prediction errors. The model can be used to evaluate (1) the regulation costs of wind power, (2) regulation market prices including effects related to the participation of power producers in the regulating power market, (3) value of accurate wind forecasts and (4) the effect of decreasing the length of the spot market clearance. This article discusses the problems related to developing a realistic model of the regulating power market including the interaction between the spot market and the regulating power market. There are several issues that make things complicated. (1) How to calculate the minimum amount of needed secondary (minute) reserves. Traditionally the Nordic TSOs have used an N-1 criteria in each country to determine the required amounts of positive secondary reserve, but as installed wind power capacity grows, it will become relevant to include the wind power prediction errors in the estimation of secondary reserves. (2) Consumption forecast errors and plant outages also contribute to activation of regulating power and should have stochastic input series besides wind power. (3) Risk premiums and transaction costs in the regulating power market are difficult to estimate as well as the effects of the possible use of market power. This is especially true in the Nordic system with the high share of hydro power, since the water value and hydrological limitations make things more complex than in a thermal system. (4) The available regulation capacity is not necessarily equal to the truly available capacity. All producers don't participate in the regulation market although in principle they could. (orig.)

  9. Assessment of small versus large hydro-power developments - a Norwegian case study

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Tor Haakon; Harby, Atle

    2010-07-01

    Full text: The era of new, large hydro-power development projects seems to be over in Norway. Partly as a response to this, a large number of applications for the development of smallscale hydro power projects up to 10 MW overflow the Water Resources and Energy Directorate, resulting in an extensive development of small tributaries and water courses in Norway. This study has developed a framework for the assessment and comparison of several small versus many large hydro-power projects based on a multi-criteria analysis (MCA) approach, and further tested this approach on planned or developed projects in the Helgeland region, Norway. Multi-criteria analysis is a decision-support tool aimed at providing a systematic approach for the comparison of various alternatives with often non-commensurable and conflicting attributes. At the same time, the technique enables complex problems and various alternatives to be assessed in a transparent and simple way. The MCA-software was in our case equipped with 2 overall criteria (objectives) with a number of sub criteria; Production with sub-criteria like volume of energy production, installed effect, storage capacity and economical profit; Environmental impacts with sub-criteria like fishing interests, biodiversity, protection of unexploited nature The data used in the case study is based on the planned development of Vefsna (large project) with the energy/effect production estimated and the environmental impacts identified as part of the feasibility studies (the project never reached the authorities' licensing system with a formal EIA). The small-scale hydro-power projects used for comparison are based on realized projects in the Helgeland region and a number of proposed projects, up scaled to the size of the proposed Vefsna-development. The results from the study indicate that a large number of small-scale hydro-power projects need to be implemented in order to balance the volume of produced electricity/effect from one

  10. Value of pumped hydro storage in a hybrid energy generation and allocation system

    International Nuclear Information System (INIS)

    Kocaman, Ayse Selin; Modi, Vijay

    2017-01-01

    Highlights: •We propose a two-stage stochastic mixed-integer programming model for a hybrid energy system. •We investigate the solar and PHES integration considering the streamflow uncertainty. •We study the benefit of PHES system over conventional hydropower systems to support solar. •We examine the role of PHES systems in both isolated and connected systems. -- Abstract: Transition from fossil fuels to renewable sources is inevitable. In this direction, variation and intermittency of renewables can be integrated into the grid by means of hybrid systems that operate as a combination of alternative resources, energy storage and long distance transmission lines. In this study, we propose a two-stage stochastic mixed-integer programming model for sizing an integrated hybrid energy system, in which intermittent solar generation in demand points is supported by pumped hydro storage (PHES) systems and diesel is used as an expensive back-up source. PHES systems work as a combination of pumped storage and conventional hydropower stations since there is also natural streamflow coming to the upper reservoirs that shows significant seasonal and inter-annual variability and uncertainty. With several case studies from India, we examine the role of high hydropower potential in the Himalaya Mountains to support solar energy generation in the form of pumped hydro or conventional hydro system while meeting the demand at various scales. We show that pumped hydro storage can keep the diesel contribution to meet the demand less than 10%, whereas this number can go up to more than 50% for conventional systems where the streamflow potential is limited compared to the demand. We also examine the role of pumped hydro systems in both isolated and connected systems (through inter-regional transmission lines) and show that the benefit of pumped hydro is more significant in isolated systems and resource-sharing in connected systems can substitute for energy storage. In addition, with

  11. Manitoba Hydro's earth power program and Manitoba market update

    International Nuclear Information System (INIS)

    Pearson, K.

    2005-01-01

    An outline of Manitoba Hydro's Earth Power program was presented. Details of the heat pump market in Manitoba were provided, including details of residential and commercial sales. Total residential heat pump sales amounted to 577 units in 2004, equivalent to over $11.2 million in sales. Commercial installations amounted to approximately $12.7 million. An outline of industry players was presented. The goals of Manitoba Hydro were outlined in relation to geothermal energy and the Power Smart program. Their objectives included increasing awareness of geothermal energy, making heat pumps more accessible, and improving industry infrastructure. Other objectives included educating the public about life-cycle cost implications, residential loans and commercial incentives. To date, the residential power loan has provided financing to over 300 Manitoba home owners for installations, with electrical savings of over 1.34 Gwh and natural gas savings of 279,425 m 3 . The program is also committed to providing assistance with feasibility studies. Provincial tax credits for the Earth Program included a 10 per cent deduction of geothermal heat pump purchases from corporation income tax. Case studies of the program were presented along with an outline of the geothermal heat pump for homes booklet. Details of the residential earth power loan were provided, including details of installation, system completion and approval processes. Awards and accolades for the program include the 2004 HRAI Education supporter award and recognition by the David Suzuki Foundation, which highlighted the program as a national leader in encouraging and facilitating the use of GeoExchange technology. tabs, figs

  12. Pump Hydro Energy Storage systems (PHES) in groundwater flooded quarries

    Science.gov (United States)

    Poulain, Angélique; de Dreuzy, Jean-Raynald; Goderniaux, Pascal

    2018-04-01

    Pump storage hydroelectricity is an efficient way to temporarily store energy. This technique requires to store temporarily a large volume of water in an upper reservoir, and to release it through turbines to the lower reservoir, to produce electricity. Recently, the idea of using old flooded quarries as a lower reservoir has been evoked. However, these flooded quarries are generally connected to unconfined aquifers. Consequently, pumping or injecting large volumes of water, within short time intervals, will have an impact on the adjacent aquifers. Conversely, water exchanges between the quarry and the aquifer may also influence the water level fluctuations in the lower reservoir. Using numerical modelling, this study investigates the interactions between generic flooded open pit quarries and adjacent unconfined aquifers, during various pump-storage cyclic stresses. The propagation of sinusoidal stresses in the adjacent porous media and the amplitude of water level fluctuations in the quarry are studied. Homogeneous rock media and the presence of fractures in the vicinity of the quarry are considered. Results show that hydrological quarry - rock interactions must be considered with caution, when implementing pump - storage systems. For rock media characterized by high hydraulic conductivity and porosity values, water volumes exchanges during cycles may affect significantly the amplitude of the water level fluctuations in the quarry, and as a consequence, the instantaneous electricity production. Regarding the impact of the pump - storage cyclic stresses on the surrounding environment, the distance of influence is potentially high under specific conditions, and is enhanced with the occurrence of rock heterogeneities, such as fractures. The impact around the quarry used as a lower reservoir thus appears as an important constraining factor regarding the feasibility of pump - storage systems, to be assessed carefully if groundwater level fluctuations around the quarry

  13. Island operation - modelling of a small hydro power system

    Energy Technology Data Exchange (ETDEWEB)

    Skarp, Stefan

    2000-02-01

    Simulation is a useful tool for investigating a system behaviour. It is a way to examine operating situations without having to perform them in reality. If someone for example wants to test an operating situation where the system possibly will demolish, a computer simulation could be a both cheaper and safer way than to do the test in reality. This master thesis performs and analyses a simulation, modelling an electronic power system. The system consists of a minor hydro power station, a wood refining industry, and interconnecting power system components. In the simulation situation the system works in a so called island operation. The thesis aims at making a capacity analysis of the current system. Above all, the goal is to find restrictions in load power profile of the consumer, under given circumstances. The computer software used in simulations is Matlab and its additional program PSB (Power System Blockset). The work has been carried out in co-operation with the power supplier Skellefteaa Kraft, where the problem formulation of this master thesis was founded.

  14. Hybrid Micro-Hydro Power Generation Development in Endau Rompin National Park Johor, Malaysia

    Directory of Open Access Journals (Sweden)

    Yusop Azli

    2017-01-01

    Full Text Available Micro-Hydro electrical power systems are very useful for remote area electrification which does not had supply from the national grid. On the contrary, this area has river streams with high potential for micro-hydro power generation. As such, the UTHM ECO-Hydro Team embarked on a project for erecting a micro-hydro power plant with collaboration with National Education Research Center (NERC, Johor National Park Corporation in Endau Rompin. The existing power generation in this area at present is by using diesel generator gives negative impact on finance and environment in the long run. It supplies power to several including library, offices, open laboratory, chalets and dorms.. At the moment, the micro-hydro system complements the diesel generator, thus becoming a hybrid power generation system.

  15. 78 FR 62350 - Lock+ Hydro Friends Fund III, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-10-18

    .... 14540-000] Lock+ Hydro Friends Fund III, LLC; Western Minnesota Municipal Power Agency; Notice...+ Hydro Friends Fund III, LLC for Project No. 14539-000 and Western Minnesota Municipal Power Agency for... CFR 385.2001(a)(2) (2013). On October 21, 2013, at 10:00 a.m. (Eastern Time), the Secretary of the...

  16. 78 FR 70549 - Lock+ Hydro Friends Fund III, LLC, Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-11-26

    .... 14540-000] Lock+ Hydro Friends Fund III, LLC, Western Minnesota Municipal Power Agency; Notice...+ Hydro Friends Fund III, LLC for Project No. 14539-000 and Western Minnesota Municipal Power Agency for... CFR.385.2001(a)(2) (2013). On November 25, 2013, at 10:00 a.m. (Eastern Time), the Secretary of the...

  17. Power trade: A mean to replace thermal to hydro power

    Energy Technology Data Exchange (ETDEWEB)

    Viladrich, Christian; Brun, Pierre; Pereira, Alice; Moustafa, Fatma

    2010-09-15

    In the framework of the Eastern Nile Power Trade Program Study a comprehensive generation and transmission expansion plan was established for Egypt, Ethiopia, and Sudan. The results show that an interconnection between these countries is profitable and has a positive impact on CO2 savings. A common development of power system and a power market can promote the regional cooperation to use the Nile waters for the benefit of the entire region.

  18. Power source labelling and hydro-power - a chance or a risk?

    International Nuclear Information System (INIS)

    Wurche, P.

    2005-01-01

    This short article discusses the electricity labelling legislation passed in Switzerland in November 2004 and similar legislation currently being introduced on a Europe-wide basis. In the future, electricity consumers will be provided with regular information on where and in which type of power station their electricity is generated. The article discusses how such a declaration may affect Swiss hydro-power stations and the changes in customer-perception that the power generation declaration will initiate

  19. Design considerations and operating experience with wet storage of Ontario Hydro's irradiated fuel

    International Nuclear Information System (INIS)

    Frost, C.R.; Naqvi, S.J.; McEachran, R.A.

    1987-01-01

    The characteristics of Ontario Hydro's fuel and at-reactor irradiated fuel storage water pools (or irradiated fuel bays) are described. There are two types of bay known respectively as primary bays and auxiliary bays, used for at-reactor irradiated fuel storage. Irradiated fuel is discharged remotely from Ontario Hydro's reactors to the primary bays for initial storage and cooling. The auxiliary bays are used to receive and store fuel after its initial cooling in the primary bay, and provide additional storage capacity as needed. The major considerations in irradiated fuel bay design, including site-specific requirements, reliability and quality assurance, are discussed. The monitoring of critical fuel bay components, such as bay liners, the development of high storage density fuel containers, and the use of several irradiated fuel bays at each reactor site have all contributed to the safe handling of the large quantities of irradiated fuel over a period of about 25 years. Routine operation of the irradiated fuel bays and some unusual bay operational events are described. For safety considerations, the irradiated fuel in storage must retain its integrity. Also, as fuel storage is an interim process, likely for 50 years or more, the irradiated fuel should be retrievable for downstream fuel management phases such as reprocessing or disposal. A long-term experimental program is being used to monitor the integrity of irradiated fuel in long-term wet storage. The well characterized fuel, some of which has been in wet storage since 1962 is periodically examined for possible deterioration. The evidence from this program indicates that there will be no significant change in irradiated fuel integrity (and retrievability) over a 50 year wet storage period

  20. Power system data communication architecture at BC Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Struyk, E.

    2001-07-01

    Development of a power system data communication architecture (PSDCA) at British Columbia Hydro that enables authorized corporate users to access station-intelligent electronic devices (IEDs) for power system data in non real-time, without compromising the reliability and availability of the real-time SCADA systems, is described. Also discussed is the development of major upgrade initiatives for expanding the use of intelligent electronic devices and remote terminal units (RTUs) which report to the main System Control Centre at Burnaby, BC, and to the four Area Control Centres located throughout the province. The network architecture that incorporates industry standards for PSDCA also provides an opportunity to existing network security systems against electronic threats such as hackers and saboteurs, beyond the simple methods of single or two-level passwords of existing protection control and monitoring equipment systems. The virtual private network (VPN) technology built into the PSDCA will allow secure access to station IED data by corporate users to access their own power data in a secure and reliable fashion. 4 figs.

  1. Method for assessing wind power integration in a hydro based power system

    International Nuclear Information System (INIS)

    Norheim, I.; Palsson, M.; Tande, J.O.G.; Uhlen, K.

    2006-01-01

    The present paper demonstrates a method for assessment of how much wind power that can be integrated in a system with limited transmission capacity. Based on hydro inflow data and wind measurements (for different locations of planned wind farms in an area) it is possible to assess how much wind power that can be fed into a certain point in the transmission network without violating the transmission capacity limits. The proposed method combines the use of market modelling and detailed network analysis in order to assess the probability of network congestions rather than focusing on extreme cases. By computing the probability distribution of power flow on critical corridors in the grid it is possible to assess the likelihood of network congestions and the amount of energy that must be curtailed to fulfil power system security requirements (n-1). This way the assessment is not only made of worst case scenarios, assuming maximal flow from hydro plants and maximal wind power production. As extreme case scenarios are short term and may be solved by market mechanisms or automatic system protection schemes (disconnection of wind power or hydro power), the proposed method may reveal that it would be economic to install more wind power than if only based on analysis of worst case scenarios. (orig.)

  2. Application of energy storage units in an interconnected hydro ...

    African Journals Online (AJOL)

    The main objective of Automatic Generation Control (AGC) is to balance the total system generation against system load and losses so that the desired frequency and power interchange with neighbouring systems are maintained. Any mismatch between generation and demand causes the system frequency to deviate from ...

  3. 78 FR 62350 - FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-10-18

    .... 14491-000] FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing... applications were filed by FFP Qualified Hydro 14, LLC for Project No. 13579-002 and Western Minnesota... regular business day. See 18 CFR 385.2001(a)(2) (2013). On October 21, 2013, at 10:00 a.m. (Eastern Time...

  4. It's done... or the unmanned operation in hydro power plants

    International Nuclear Information System (INIS)

    Chudy, M.

    2009-01-01

    Looking back at the two years of activities performed while launching the individual Hydro Power Plants (HPP) of the Slovenske elektrarne, a.s. into the unmanned operation, there was 'quantum' of work done during the implementation of each new HPP in the area of group output regulation, substation management, failure and alarm record and evaluation system, technological and information service. It is a good feeling to see the results of the work - when it works. Someone could say that we just test the project at one HPP and the others just get implemented. The fact that the HPPs differ from each other brings its specifics, which needed to be handled individually in the SW or HW area, or in terms of communication. We should definitely mention the enthusiasm and helpfulness of the employees even at the cost of their free time spent in launching the power plants into unmanned operation. The reward for the hours spent dealing with the technical issues and revealing the shortcomings in the whole operation management process is today in the greater possibilities of gaining an overviews of the events in the operation of each HPP or TG generation unit. However, our hands are little less free to perform interventions in the control systems - time for the maintenance - necessary planning of the outages - coordination within the operation preparation. (author)

  5. Modelling the economics of combined wind/hydro/diesel power systems

    International Nuclear Information System (INIS)

    Sinha, A.

    1993-01-01

    A model that stimulates the performance and economics of a combined wind/hydro/diesel plant with pumped storage has been developed. It is applied to a hypothetical site to demonstrate how a subset of the cheapest configuration of plant sizes may be identified, illustrating in particular the trade-off between the hydro storage capacity and the wind turbine penetration. It seems that, with the wind and water regimes employed, pumped storage is unlikely to have significant benefits, but may be beneficial in areas without natural inflow, in which case the reservoir is used as a store for excess wind output. (author)

  6. Thermo-dynamic analysis and simulation of a combined air and hydro energy storage (CAHES) system

    International Nuclear Information System (INIS)

    Bi, Xianyun; Liu, Pei; Li, Zheng

    2016-01-01

    Large-scale energy storage is essential for the stability of a grid, especially for those with large proportion of intermittent renewable energy sources. The efficiency of a conventional compressed air energy storage (CAES) technology is limited by compression heat loss and changing working conditions. In this manuscript, a combined air and hydro energy storage (CAHES) system is proposed, which realizes a higher exergy efficiency compared with conventional CAES systems by reducing compression heat losses and addressing issues of changing working conditions through thermal compensation from solar radiation. The configuration and two operating modes of the proposed CAHES system are firstly introduced, followed by theoretical analysis and numerical simulation under different operating modes to analyze system performances. Impacts of external and internal factors on the system performances are analyzed. The practical feasibility of the system is also investigated. Results show that the exergy efficiency of the system reaches approximately 50%, whilst the charging electricity ratio reaches over 80%. - Highlights: • A combined air and hydro energy storage system is proposed. • High exergy efficiency is achieved and consumption of fossil fuel is eliminated. • The system performance is affected by compression ratio and solar radiation.

  7. Innovative private micro-hydro power development in Rwanda

    International Nuclear Information System (INIS)

    Pigaht, Maurice; Plas, Robert J. van der

    2009-01-01

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (i) institutional arrangements rather than technical quality determine the success of such projects; (ii) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (iii) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too.

  8. Innovative private micro-hydro power development in Rwanda

    Energy Technology Data Exchange (ETDEWEB)

    Pigaht, Maurice; Van der Plas, Robert J. [MARGE-Netherlands, Brem 68, 7577 EW Oldenzaal (Netherlands)

    2009-11-15

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (1) institutional arrangements rather than technical quality determine the success of such projects; (2) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (3) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too. (author)

  9. Hydro power projects in Pakistan- who pays the price

    International Nuclear Information System (INIS)

    Baig, N.

    2005-01-01

    In this paper an attempt has been made to trace the procedures that have been adopted to arrive at the market value of the assets lost in the construction of Ghazi Barotha Hydro Power Project. There is nothing secret or mysterious about the value of land. It is a commodity commonly dealt with and like every other commodity it. has a price, which can be ascertained within certain limits. This price, however, constantly varies according to the variations of the supply and demand and it is impossible to fix it at any given time with mathematical accuracy. The question of fair compensation is not an algebraic problem, which would be solved by an abstract formula. Compensation must be determined by reference to the price, which a willing vendor might reasonably expect to obtain from a willing purchaser. Although market value cannot be calculated with mathematical precision and a certain amount of conjecture is inevitable, but in valuing one should be careful not to go too far in this direction. (author)

  10. Optimal Capacity Proportion and Distribution Planning of Wind, Photovoltaic and Hydro Power in Bundled Transmission System

    Science.gov (United States)

    Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.

    2017-05-01

    The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.

  11. Hydro power plants, an overview of the current types and technology

    OpenAIRE

    Tkáč Štefan

    2018-01-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy...

  12. Set-up of a pump as turbine use in micro-pumped hydro energy storage: a case of study in Froyennes Belgium

    Science.gov (United States)

    Morabito, A.; Steimes, J.; Bontems, O.; Zohbi, G. Al; Hendrick, P.

    2017-04-01

    Its maturity makes pumped hydro energy storage (PHES) the most used technology in energy storage. Micro-hydro plants (electricity production such as wind and solar power. This paper presents the design of a micro-PHES developed in Froyennes, Belgium, using a pump as turbine (PaT) coupled with a variable frequency driver (VFD). The methods adopted for the selection of the most suitable pump for pumping and reverse mode are compared and discussed. Controlling and monitoring the PaT performances represent a compulsory design phase in the analysis feasibility of PaT coupled with VFD in micro PHES plant. This study aims at answering technical research aspects of µ-PHES site used with reversible pumps.

  13. Optimised deployment of hydro-power generation facilities

    International Nuclear Information System (INIS)

    Werlen, K.

    2004-01-01

    This article discusses how the opening-up of the European electricity market has led to the creation of more room for manoeuvre in the deployment of the generation capacity of dam and pumped-storage-based hydropower facilities and low-head power stations. Software tools for the optimisation of the operation of power generation facilities that can take care of complex hydraulic interdependencies are described. The use of the software for the assessment of new installations being planned or of older installations being extended is examined. The influence of climatic conditions, market prices for power, the general requirements placed on the system and other influences on financial gain are looked at. The article makes recommendations on those factors influencing the design of the software and for its optimal use in practice

  14. Photovoltaic power systems energy storage

    International Nuclear Information System (INIS)

    Buldini, P.L.

    1991-01-01

    Basically, the solar photovoltaic power system consists of: Array of solar panels; Charge/voltage stabilizer; Blocking diode and Storage device. The storage device is a very important part of the system due to the necessity to harmonize the inevitable time shift between energy supply and demand. As energy storage, different devices can be utilized, such as hydropumping, air or other gas compression, flywheel, superconducting magnet, hydrogen generation and so on, but actually secondary (rechargeable) electrochemical cells appear to be the best storage device, due to the direct use for recharge of the d.c. current provided by the solar panels, without any intermediate step of energy transformation and its consequent loss of efficiency

  15. Penstock failure detection system at the 'Valsan' hydro power plant

    International Nuclear Information System (INIS)

    Georgescu, A M; Coşoiu, C I; Alboiu, N; Hlevca, D; Tataroiu, R; Popescu, O

    2012-01-01

    'Valsan' is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small 'Valsan' river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. 'Hidroelectrica', the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the 'Valsan' HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of 'Hidroelectrica' a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  16. Penstock failure detection system at the "Valsan" hydro power plant

    Science.gov (United States)

    Georgescu, A. M.; Coşoiu, C. I.; Alboiu, N.; Hlevca, D.; Tataroiu, R.; Popescu, O.

    2012-11-01

    "Valsan" is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small "Valsan" river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. "Hidroelectrica", the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the "Valsan" HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of "Hidroelectrica" a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  17. Effect of turbine materials on power generation efficiency from free water vortex hydro power plant

    International Nuclear Information System (INIS)

    Sritram, P; Treedet, W; Suntivarakorn, R

    2015-01-01

    The objective of this research was to study the effect of turbine materials on power generation efficiency from the water free vortex hydro power plant made of steel and aluminium. These turbines consisted of five blades and were twisted with angles along the height of water. These blades were the maximum width of 45 cm. and height of 32 cm. These turbines were made and experimented for the water free vortex hydro power plant in the laboratory with the water flow rate of 0.68, 1.33, 1.61, 2.31, 2.96 and 3.63 m 3 /min and an electrical load of 20, 40, 60, 80 and 100 W respectively. The experimental results were calculated to find out the torque, electric power, and electricity production efficiency. From the experiment, the results showed that the maximum power generation efficiency of steel and aluminium turbine were 33.56% and 34.79% respectively. From the result at the maximum water flow rate of 3.63 m 3 /min, it was found that the torque value and electricity production efficiency of aluminium turbine was higher than that of steel turbine at the average of 8.4% and 8.14%, respectively. This result showed that light weight of water turbine can increase the torque and power generation efficiency. (paper)

  18. Experimental and numerical investigation of hydro power generator ventilation

    Science.gov (United States)

    Jamshidi, H.; Nilsson, H.; Chernoray, V.

    2014-03-01

    Improvements in ventilation and cooling offer means to run hydro power generators at higher power output and at varying operating conditions. The electromagnetic, frictional and windage losses generate heat. The heat is removed by an air flow that is driven by fans and/or the rotor itself. The air flow goes through ventilation channels in the stator, to limit the electrical insulation temperatures. The temperature should be kept limited and uniform in both time and space, avoiding thermal stresses and hot-spots. For that purpose it is important that the flow of cooling air is distributed uniformly, and that flow separation and recirculation are minimized. Improvements of the air flow properties also lead to an improvement of the overall efficiency of the machine. A significant part of the windage losses occurs at the entrance of the stator ventilation channels, where the air flow turns abruptly from tangential to radial. The present work focuses exclusively on the air flow inside a generator model, and in particular on the flow inside the stator channels. The generator model design of the present work is based on a real generator that was previously studied. The model is manufactured taking into consideration the needs of both the experimental and numerical methodologies. Computational Fluid Dynamics (CFD) results have been used in the process of designing the experimental setup. The rotor and stator are manufactured using rapid-prototyping and plexi-glass, yielding a high geometrical accuracy, and optical experimental access. A special inlet section is designed for accurate air flow rate and inlet velocity profile measurements. The experimental measurements include Particle Image Velocimetry (PIV) and total pressure measurements inside the generator. The CFD simulations are performed based on the OpenFOAM CFD toolbox, and the steady-state frozen rotor approach. Specific studies are performed, on the effect of adding "pick-up" to spacers, and the effects of the

  19. Hydro power plants, an overview of the current types and technology

    Science.gov (United States)

    Tkáč, Štefan

    2018-03-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  20. Hydro turbine governor’s power control of hydroelectric unit with sloping ceiling tailrace tunnel

    Science.gov (United States)

    Fu, Liang; Wu, Changli; Tang, Weiping

    2018-02-01

    The primary frequency regulation and load regulation transient process when the hydro turbine governor is under the power mode of hydropower unit with sloping ceiling tailrace are analysed by field test and numerical simulation in this paper. A simulation method based on “three-zone model” to simulate small fluctuation transient process of the sloping ceiling tailrace is proposed. The simulation model of hydraulic turbine governor power mode is established by governor’s PLC program identification and parameter measurement, and the simulation model is verified by the test. The slow-fast-slow “three-stage regulation” method which can improve the dynamic quality of hydro turbine governor power mode is proposed. The power regulation strategy and parameters are optimized by numerical simulation, the performance of primary frequency regulation and load regulation transient process when the hydro turbine governor is under power mode are improved significantly.

  1. Improving wind power quality with energy storage

    DEFF Research Database (Denmark)

    Rasmussen, Claus Nygaard

    2009-01-01

    The results of simulation of the influence of energy storage on wind power quality are presented. Simulations are done using a mathematical model of energy storage. Results show the relation between storage power and energy, and the obtained increase in minimum available power from the combination...... of wind and storage. The introduction of storage enables smoothening of wind power on a timescale proportional to the storage energy. Storage does not provide availability of wind power at all times, but allows for a certain fraction of average power in a given timeframe to be available with high...... probability. The amount of storage capacity necessary for significant wind power quality improvement in a given period is found to be 20 to 40% of the energy produced in that period. The necessary power is found to be 80 to 100% of the average power of the period....

  2. Objective thermo-hydro-mechanical modelling of the damaged zone around a radioactive waste storage site

    International Nuclear Information System (INIS)

    Marinelli, Ferdinando

    2013-01-01

    We present two different approaches to describe the hydro-mechanical behaviour of geo-materials. In the first approach the porous media is studied through an equivalent continuum media where the interaction between the fluid and solid phases characterize the coupling behaviour at the macro-scale. We take into account this approach to model experimental tests performed over a hollow cylinder sample of clay rock (Boom Clay), considered for nuclear waste storage. The experimental results clearly show that the mechanical behaviour of the material is strongly anisotropic. For this reason we chose an elasto-plastic model based on Drucker-Prager criterion where the elastic part is characterized by cross anisotropy. The numerical results of boundary value problem clearly show localised strains around the inner hollow section. In order to regularize the numerical problem we consider a second gradient local continuum media with an enriched kinematic where an internal length can be introduced making the results mesh independent. The uniqueness study is carried out showing that changing the temporal discretization of the problem leads to different solutions. In the second approach we study the hydro-mechanical behaviour of a porous media that it is characterised by the microstructure of the material. The microstructure taken into account is composed by elastic grains, cohesive interfaces and a network of fluid channels. Using a periodic media a numerical homogenization (square finite element method) is considered to compute mass flux, stress and density of the mixture. In this way a pure numerical constitutive law is built from the microstructure of the media. This method has been implemented into a finite element code (Lagamine, Universite de Liege) to obtain results at the macro-scale. A validation of this implementation is performed for a pure mechanical boundary value problem and for a hydro-mechanical one. (author)

  3. Micro-hydro power in the UK: The role of communities in an emerging energy resource

    International Nuclear Information System (INIS)

    Bracken, L.J.; Bulkeley, H.A.; Maynard, C.M.

    2014-01-01

    Research around micro-hydro power is focused on technical aspects with limited understanding of the social organisation and environmental implications. We examine the ways in which micro-hydro is engaged by people and organisations as a means of contributing to the UK's policy ambition for renewable energy. We bring to the fore the way in which expertise is used and contested. A web based review of micro-hydro schemes in the UK was undertaken and a detailed evaluation of two schemes in the North of England was conducted to determine how expertise and contestation figures in community schemes. Results demonstrate a rapid expansion of micro-hydro in the UK. Ownership/control is highly ‘community based’. Until now research around micro-hydro has been dominated by technical approaches with schemes defined in terms of hardware. We propose a third dimension to Walker and Cass's (2007) classification of renewable energy developments: the environmental dimension. We suggest this dimension of micro-hydro is critical, both in terms of the extent to which resources can be realised but also the ways in which it might attract controversy, in particular around how expertise is used and valued. - Highlights: • Analysis of micro-hydro schemes in the UK demonstrates a recent rapid expansion. • We propose a third dimension to renewable energy developments: the environmental dimension. • The environmental dimension of micro-hydro determines how resources are realised. • Environmental features underpin the controversy which can emerge around schemes. • The ownership of micro-hydro schemes is highly ‘community based’

  4. Hydro power in the German system of energy supply; Wasserkraft im Energiesystem Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    Kaltschmitt, M. [Stuttgart Univ. (Germany). Abt. Neue Energietechnologie und Technikanalyse

    1997-12-31

    The technical potentials of electric power generation from hydro power in Germany, the current harnessing of hydro power, its costs, and certain characteristic quantities reflecting its effects on the environment are described. These diverse characteristic quantities are compared with those of other renewable and fossil energy sources used to generate electricity. On this basis, opportunities for extending the use of hydro power in Germany and its limits are discussed. (orig.) [Deutsch] Das Ziel der folgenden Ausfuehrungen ist, die technischen Potentiale und deren derzeitige Nutzung, die Kosten und bestimmte die Umwelteffekte beschreibende Kenngroessen einer Stromerzeugung aus Wasserkraft in Deutschland darzustellen. Diese unterschiedlichen Kenngroessen werden anschliessend mit denen anderer regenerativer Energien und fossiler Energietraeger zur Stromerzeugung verglichen. Ausgehend davon werden die Moeglichkeiten und Grenzen einer weitergehenden Wasserkraftnutzung im Energiesystem Deutschland diskutiert. (orig.)

  5. Analysis of Axial Turbine Pico-Hydro Electrical Power Plant in North Sulawesi Indonesia

    Science.gov (United States)

    Sangari, F. J.; Rompas, P. T. D.

    2018-02-01

    This study presents analysis of pico-hydro electrical power plant in North Sulawesi, Indonesia. The objective of this study is to get a design of axial turbine pico-hydro electrical power plant. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of study, analysis of hydropower ability and analyzing costs of power plant. The result showed that the design of axial turbine pico-hydro installation is connected to a generator to produce electrical energy maximum can be used for household needs in villages. This analyze will be propose to local government of Minahasa, North Sulawesi, Indonesia.

  6. BC Hydro experiences the power of engineering document management software

    International Nuclear Information System (INIS)

    Wilkins, A.

    2000-01-01

    The recent popularity of electronic document management software (EDMS), specifically designed for engineering CAD/CAM drawings that holds the promise of reducing paper-pushing and freeing up organizational resources for more productive purposes, is discussed. To illustrate how such systems function, a document management system installed at BC Hydro, with over 2,500 users in two main engineering groups is described. The new system - FileNET - replaces several older systems that have been used as stand-alone systems in various divisions of BC Hydro for some time. Instead of integrating the entire file of some 750,000 documents, the new system has complete records of some 70,000 of the most recent CAD drawings and an on-line index to the older file that is used less frequently. Access to the entire storehouse of drawings is said to be fast, efficient and secure. Automated document control procedures during work-in-progress, viewing, redlining capabilities, seamless integration with CAD tools and Web access to drawings from anywhere within the two engineering divisions, are some of the most noteworthy characteristics of the new system. It does not completely replace paper, but it does promise significant streamlining of the paper handling function. It also ensures that BC Hydro's central computer is the prime repository of all documents and drawings, and that this valuable record of environmental. legal, regulatory and other public policy importance is instantly available, without the need to handle paper

  7. Reduced storage and balancing needs in a fully renewable European power system with excess wind and solar power generation

    DEFF Research Database (Denmark)

    Heide, Dominik; Greiner, Martin; von Bremen, Lüder

    The storage and balancing needs of a simplified European power system, which is based on wind and solar power generation only, are derived from an extensive weather-driven modeling of hourly power mismatches between generation and load. The storage energy capacity, the annual balancing energy...... and the balancing power are found to depend significantly on the mixing ratio between wind and solar power generation. They decrease strongly with the overall excess generation. At 50% excess generation the required long-term storage energy capacity and annual balancing energy amount to 1% of the annual consumption....... The required balancing power turns out to be 25% of the average hourly load. These numbers are in agreement with current hydro storage lakes in Scandinavia and the Alps, as well as with potential hydrogen storage in mostly North-German salt caverns....

  8. Reduced storage and balancing needs in a fully renewable European power system with excess wind and solar power generation

    DEFF Research Database (Denmark)

    Heide, Dominik; Greiner, Martin; von Bremen, Lüder

    2011-01-01

    The storage and balancing needs of a simplified European power system, which is based on wind and solar power generation only, are derived from an extensive weather-driven modeling of hourly power mismatches between generation and load. The storage energy capacity, the annual balancing energy...... and the balancing power are found to depend significantly on the mixing ratio between wind and solar power generation. They decrease strongly with the overall excess generation. At 50% excess generation the required long-term storage energy capacity and annual balancing energy amount to 1% of the annual consumption....... The required balancing power turns out to be 25% of the average hourly load. These numbers are in agreement with current hydro storage lakes in Scandinavia and the Alps, as well as with potential hydrogen storage in mostly North-German salt caverns....

  9. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  10. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  11. An approach to the investment analysis of small and medium hydro-power plants

    DEFF Research Database (Denmark)

    Forouzbakhsh, Farshid; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Sincea large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments,however it is possible...

  12. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION

    Directory of Open Access Journals (Sweden)

    Sinvaldo Rodrigues Moreno

    2015-04-01

    Full Text Available This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO. PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the authors consider an optimization problem related to a daily scheduling of small hydro power dispatch. The goal is construct a feasible solution that maximize the cascade electricity production, following the environmental constraints and water balance. The paper proposes an improved Particle Swarm Optimization (PSO algorithm, which takes advantage of simplicity and facility of implementation. The algorithm was successfully applied to the optimization of the daily schedule strategies of small hydro power plants, considering maximum water utilization and all constraints related to simultaneous water uses. Extensive computational tests and comparisons with other heuristics methods showed the effectiveness of the proposed approach.

  13. Cost-effective design of ringwall storage hybrid power plants: A real options analysis

    International Nuclear Information System (INIS)

    Weibel, Sebastian; Madlener, Reinhard

    2015-01-01

    Highlights: • Economic viability, optimal size, and siting of a hybrid ringwall hydro power plant. • Real options analysis for optimal investment timing and stochastic storage volumes. • Stochastic PV and solar power production affects optimal size of the storage device. • Monte Carlo simulation is used for wind/solar power, el. price, and investment cost. • Numerical computations for two different hybrid ringwall storage plant scenarios. - Abstract: We study the economic viability and optimal sizing and siting of a hybrid plant that combines a ringwall hydro storage system with wind and solar power plants (ringwall storage hybrid power plant, RSHPP). A real options model is introduced to analyze the economics of an onshore RSHPP, and in particular of the varying storage volume in light of the stochastic character of wind and solar power, as well as the optimal investment timing under uncertainty. In fact, many uncertainties arise in such a project. Energy production is determined by the stochastic character of wind and solar power, and affects the optimal size of the storage device. Monte Carlo simulation is performed to analyze the following sources of uncertainty: (i) wind intensity and solar irradiation; (ii) future electricity price; and (iii) investment costs. The results yield the optimal size of the storage device; the energy market on which the operator should sell the electricity generated; numerical examples for two different RSHPP scenarios; and a real options model for analyzing the opportunity to defer the project investment and thus to exploit the value of waiting

  14. Electricity production by hydro power plants: possibilities of forecasting

    International Nuclear Information System (INIS)

    Barkans, J.; Zicmane, I.

    2004-01-01

    Hydro energy accounts for 17% of global electricity production and is the most important source of renewable energies actively used today, being at the same time the least influential ecologically. Its only disadvantages is that this kind of energy is difficult to forecast, which hinders not only the planning of tariffs, year budgets and investments, but also contractual negotiations in particular month. The paper shows that the forecasting of hydro energy production can be linked to certain natural processes, namely, to the cyclic behaviour observed for water flows of the world's rivers. The authors propose a method according to which the forecasting procedure is performed using the data of observations as signals applied to special digital filters transforming the water flow process into integral and differential forms, which after appropriate treatment are expected again in usual water flow units. For this purpose the water flow integral function is to be divided, by means of spectral analysis, into 'low-frequency' (with a semi-period of 44 years) and 'high-frequency' (4-6 year semi-periods) components, which are of different origin. Each of them should be forecasted separately, with the following summation of the results. In the research it is shown that the cyclic fluctuations of world rivers' water flows are directly associated with variations in the Solar activity. (authors)

  15. Hydro-pneumatic accumulators for vehicles kinetic energy storage: Influence of gas compressibility and thermal losses on storage capability

    International Nuclear Information System (INIS)

    Puddu, Pierpaolo; Paderi, Maurizio

    2013-01-01

    In this work the differences between the thermodynamic behaviour of real and ideal gases are analysed to determine their influence on the processes of compression and expansion of a gas-charged accumulator. The behaviour of real gas has a significant influence on the size of accumulators used for Kinetic Energy Recovery of vehicles. In particular, it is underscored that the accumulator's design, based on ideal gas behaviour, provides undersized accumulators and therefore makes impossible the complete energy recovery for Hydraulic Energy Storage Systems (HES). The analysis of the thermodynamic properties of gases has shown that the main differences between ideal and real behaviour are due to gas compressibility. A mathematical model of a gas-charged accumulator is developed in order to analyse its real behaviour in presence of irreversible heat transfer and viscous losses. The simulation process of charging and discharging of a hydro-pneumatic accumulator, makes it clear that hydrodynamic and thermal losses are responsible for the characteristic hysteresis cycle on the p–V diagram. Different gases are tested as charged fluid of a hydro-pneumatic accumulator to simulate cyclic processes of charge and discharge. Results show different characteristics in terms of volumetric gas properties, thermal time-constant and thermal efficiency of the accumulator. - Highlights: • A dynamic model of a gas charged accumulator was developed. • Gas compressibility significantly influences the size of high-pressure accumulators. • A hysteresis loop is indicative of the thermal energy losses. • Loss increases with increasing the period of the cyclic process. • Thermal time constant is different from compression to expansion

  16. Pumped storage hydroelectric power plant Cierny Vah

    International Nuclear Information System (INIS)

    2006-01-01

    This leaflet describes the Enterprise Cierny Vah Pumped storage hydropower plants of the joint stock company Slovenske elektrarne, a.s. (Cierny Vah PSHP). Cierny Vah PSHP has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system (ES). It is mainly the pumped storage hydro power plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation but especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control,...) gave way to dynamic functions which gained greater importance (sudden load changes control of ES, immediate meeting of the daily load diagram, frequency control and outputs given in ES, etc.) After interconnection of our ES with the UCPTE West European association in which there are besides other things, the strict criteria for observing balance of outputs, the main functions of PSPs are as follows: 1. Dynamic services for ES 2. Dispatching reserve for the fall out of the greatest ES block 3. Observing the foreign cooperation balance agreed 4. Compensation of peaks and also of sudden daily load diagram reductions. All the work is divided into four parts from the building point of view: The upper reservoir is an artificial one without the natural water inflow, built by excavation and slope on an Unknown elevation more than 1.150 m above sea level. A leading slope with a gradient 1:2 and a bottom of the reservoir

  17. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  18. Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices

    DEFF Research Database (Denmark)

    Hosseini, S.M.H.; Forouzbakhsh, Farshid; Fotouh-Firuzabad, Mahmood

    2008-01-01

    One of the most important issues in planning the ‘‘reservoir” type of hydro-power plants (HPP) is to determine the installation capacity of the HPPs and estimate its annual energy value. In this paper, a method is presented. A computer program has been developed to analyze energy calculation...

  19. Rural electrification in Indonesia : the role of micro hydro power in shaping forest conservation behavior

    NARCIS (Netherlands)

    I Wayan Gede Santika, W.; Midden, C.J.H.; Lemmens, A.M.C.

    2009-01-01

    It is reported that villagers at the villages electrified by micro hydro power (MHP) show more favorable attitudes, intentions, and behaviors toward forest conservation. They initiated a community-based agreement regulating forest cutting, reduced trees chopped from the forests, reduced intention

  20. Mini hydro electric power stations Lukar 1,2,3,4: Public enterprise (JP) Komunalec

    International Nuclear Information System (INIS)

    Stojanova, Blagica

    2004-01-01

    The role of the Public enterprises in improving entire living conditions of the citizens, not only by its services towards the citizenship such as: water supplying and public hygiene but the opportunity to produce the electric power by the Mini hydro electric-power stations built on the main city water supply pipes. The paper presents experiences of building the mini hydro electric power stations Lukar 1,2,3,4. The successful completion of this project should be a motivation for building more electric power stations because there are great water potential in the Republic of Macedonia i.e. there have been recorded more than a hundred places suitable for construction of power electric stations. This will contribute not only for clean ecological energy but will have a direct influence on the total economic development of the Republic of Macedonia. (Author)

  1. Complementarity of hydro and wind power: Improving the risk profile of energy inflows

    International Nuclear Information System (INIS)

    Denault, Michel; Dupuis, Debbie; Couture-Cardinal, Sebastien

    2009-01-01

    The complementarity of two renewable energy sources, namely hydro and wind, is investigated. We consider the diversification effect of wind power to reduce the risk of water inflow shortages, an important energy security concern for hydropower-based economic zones (e.g. Quebec and Norway). Our risk measure is based on the probability of a production deficit, in a manner akin to the value-at-risk, simulation analysis of financial portfolios. We examine whether the risk level of a mixed hydro-and-wind portfolio of generating assets improves on the risk of an all-hydro portfolio, by relaxing the dependence on water inflows and attenuating the impact of droughts. Copulas are used to model the dependence between the two sources of energy. The data considered, over the period 1958-2003, are for the province of Quebec, which possesses large hydro and wind resources. Our results indicate that for all scenarios considered, any proportion of wind up to 30% improves the production deficit risk profile of an all-hydro system. We can also estimate the value, in TW h, of any additional one percent of wind in the portfolio. (author)

  2. Distributed energy systems with wind power and energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Korpaas, Magnus

    2004-07-01

    The topic of this thesis is the study of energy storage systems operating with wind power plants. The motivation for applying energy storage in this context is that wind power generation is intermittent and generally difficult to predict, and that good wind energy resources are often found in areas with limited grid capacity. Moreover, energy storage in the form of hydrogen makes it possible to provide clean fuel for transportation. The aim of this work has been to evaluate how local energy storage systems should be designed and operated in order to increase the penetration and value of wind power in the power system. Optimization models and sequential and probabilistic simulation models have been developed for this purpose. Chapter 3 presents a sequential simulation model of a general wind hydrogen energy system. Electrolytic hydrogen is used either as a fuel for transportation or for power generation in a stationary fuel cell. The model is useful for evaluating how hydrogen storage can increase the penetration of wind power in areas with limited or no transmission capacity to the main grid. The simulation model is combined with a cost model in order to study how component sizing and choice of operation strategy influence the performance and economics of the wind-hydrogen system. If the stored hydrogen is not used as a separate product, but merely as electrical energy storage, it should be evaluated against other and more energy efficient storage options such as pumped hydro and redox flow cells. A probabilistic model of a grid-connected wind power plant with a general energy storage unit is presented in chapter 4. The energy storage unit is applied for smoothing wind power fluctuations by providing a firm power output to the grid over a specific period. The method described in the chapter is based on the statistical properties of the wind speed and a general representation of the wind energy conversion system and the energy storage unit. This method allows us to

  3. Conceptual design of planetary gearbox system for constant generator speed in hydro power plant

    Directory of Open Access Journals (Sweden)

    Bhargav

    2018-01-01

    Full Text Available Micro Hydro Power Plant (MHPP is emerging as one of the most clean, renewable and reliable energy technology for harnessing power. In MHPP hydro governors are avoided, that results in turbine speed fluctuation. MHPP requires either speed or torque amplification of generator for constant power generation. To achieve this, planetary gear transmission system is explored for MHPP due to its higher efficiency and compact size. A conceptual planetary gearbox system is developed for MHPP to maintain constant generator speed. The conceptual gearbox is designed, modelled and analysed using ADAMS software. Simulation results are found to be in close agreement with analytical results. Hence, conceptual design of planetary gearbox can be used to govern constant generator speed. In this paper, a MHPP which generate constant power of 5 kW at constant generator speed of 1490 rpm is analysed and validated

  4. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  5. Synthetic methane for power storage

    NARCIS (Netherlands)

    Botta, G.; Barankin, Michael; Walspurger, S.

    2013-01-01

    With increased share of energy generated from variable renewable sources, storage becomes a critical issue to ensure constantly balanced supply/demand. Methane is a promising vector for energy storage and transport.

  6. A Coupled Thermo-Hydro-Mechanical Model of Jointed Hard Rock for Compressed Air Energy Storage

    Directory of Open Access Journals (Sweden)

    Xiaoying Zhuang

    2014-01-01

    Full Text Available Renewable energy resources such as wind and solar are intermittent, which causes instability when being connected to utility grid of electricity. Compressed air energy storage (CAES provides an economic and technical viable solution to this problem by utilizing subsurface rock cavern to store the electricity generated by renewable energy in the form of compressed air. Though CAES has been used for over three decades, it is only restricted to salt rock or aquifers for air tightness reason. In this paper, the technical feasibility of utilizing hard rock for CAES is investigated by using a coupled thermo-hydro-mechanical (THM modelling of nonisothermal gas flow. Governing equations are derived from the rules of energy balance, mass balance, and static equilibrium. Cyclic volumetric mass source and heat source models are applied to simulate the gas injection and production. Evaluation is carried out for intact rock and rock with discrete crack, respectively. In both cases, the heat and pressure losses using air mass control and supplementary air injection are compared.

  7. Activities in support of licensing Ontario Hydro's Dry Storage Container for radioactive waste transportation

    International Nuclear Information System (INIS)

    Boag, J.M.; Lee, H.P.; Nadeau, E.; Taralis, D.; Sauve, R.G.

    1993-01-01

    The Dry Storage Container (DSC) is being developed by Ontario Hydro for the on-site storage and possible future transportation of used fuel. The DSC is essentially rectangular in shape with outer dimensions being approximately 3.5 m (H) x 2.1 m (W) x 2.2 m (L) and has a total weight of approximately 68 Mg when loaded with used fuel. The container cavity is designed to accommodate four standard fuel modules (each module contains 96 CANDU fuel bundles). The space between inner and outer steel linear (each about 12.7 mm thick) is filled with high-density reinforced shielding concrete (approximately 500 mm thick). Foam-core steel-lined impact limiters will be fitted around the container during transportation to provide impact protection. In addition, an armour ring will be installed around the flanged closure weld (inside the impact limiter) to provide protection from accidental pin impact. Testing and impact analyses have demonstrated that the DSC was able to withstand a 9 m top corner drop and a 1 m drop onto a cylindrical pin (at the welded containment flange) without compromising the structural integrity of the DSC. Thermal analysis of the DSC during simulated fire accident conditions has shown that at the end of the fire, the exterior wall and interior cavity wall temperatures were 503degC and 78degC, respectively. The maximum fuel sheath temperature predicted was 137degC which was below the maximum allowable temperature for the fuel. The FD-HEAT code used for this analysis was validated through a heat conduction test of an actual DSC wall section. (J.P.N.)

  8. Hydro power plants, an overview of the current types and technology

    Directory of Open Access Journals (Sweden)

    Tkáč Štefan

    2018-03-01

    Full Text Available Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  9. An approach to the investment analysis of small and medium hydro-power plants

    International Nuclear Information System (INIS)

    Forouzbakhsh, F.; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in 'Bookan, Iran' and SHPP in 'Nari, Iran'), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially

  10. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1997-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  11. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1998-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  12. Technical and economic aspects of operation of thermal and hydro power systems

    International Nuclear Information System (INIS)

    Bakken, Bjoern Harald.

    1997-01-01

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs

  13. Possibilities for Wind- and Small Hydro Power in China

    NARCIS (Netherlands)

    Faber, Tom

    2008-01-01

    Due to a fast growing economy and population, China’s electricity requirement vastly increases. To reduce social and environmental impact, a shift from mainly coal fired power generation towards renewable electricity options is a possible solution. The re

  14. An organization structure analysis for BC Hydro, Power Smart

    OpenAIRE

    Lellis, Leandro Bianchi

    2006-01-01

    Power Smart is BC Hydro’s demand-side management (DMS) initiative to encourage energy efficiency by its customers. Currently, they are in the midst of a very significant program redesign to influence their largest transmission voltage customers to use energy efficiently without the capability to award a capital incentive. From their internal operating model perspective, Power Smart is considering moving from an audit based function to a more consultative role. This project aims to provide and...

  15. Exploring the impact of reduced hydro capacity and lignite resources on the Macedonian power sector development

    Directory of Open Access Journals (Sweden)

    Taseska-Gjorgievskaa Verica

    2014-01-01

    Full Text Available The reference development pathway of the Macedonian energy sector highlights the important role that lignite and hydro power play in the power sector, each accounting for 40% of total capacity in 2021. In 2030, this dominance continues, although hydro has a higher share due to the retirement of some of the existing lignite plants. Three sensitivity runs of the MARKAL-Macedonia energy system model have been undertaken to explore the importance of these technologies to the system, considering that their resource may be reduced with time: (1 Reducing the availability of lignite from domestic mines by 50% in 2030 (with limited capacity of imports, (2 Removing three large hydro options, which account for 310 MW in the business-as-usual case, and (3 Both of the above restrictions. The reduction in lignite availability is estimated to lead to additional overall system costs of 0.7%, compared to hydro restrictions at only 0.1%. With both restrictions applied, the additional costs rise to over 1%, amounting to 348 M€ over the 25 year planning horizon. In particular, costs are driven up by an increasing reliance on electricity imports. In all cases, the total electricity generation decreases, but import increases, which leads to a drop in capacity requirements. In both, the lignite and the hydro restricted cases, it is primarily gas-fired generation and imports that “fill the gap”. This highlights the importance of an increasingly diversified and efficient supply, which should be promoted through initiatives on renewables, energy efficiency, and lower carbon emissions.

  16. Energy storage in future power systems

    DEFF Research Database (Denmark)

    Rasmussen, Claus Nygaard; Østergaard, Jacob; Divya, K. C.

    2011-01-01

    Most sources of renewable power are characterised by uncontrollable and chaotic variations in power output. We here look at how energy storage may benefit renewable power generation by making it available in periods with little or no intermittent generation and thereby prevent additional conventi......Most sources of renewable power are characterised by uncontrollable and chaotic variations in power output. We here look at how energy storage may benefit renewable power generation by making it available in periods with little or no intermittent generation and thereby prevent additional...... conventional generation form being used. In addition to this, one of the strongest concerns in relation to renewable power is the instability in the electric power system that it may introduce as a result of large and relatively fast power fluctuations. An additional benefit of energy storage is therefore its...

  17. Mini hydro power in Peninsular Malaysia - the past, present and future

    International Nuclear Information System (INIS)

    Bhaskar Kannan

    2006-01-01

    The early development of mini hydro development in Peninsular Malaysia was carried out by the National Electricity Board (NEB) and the projects developed in the 50s and 60s were Ulu Langat (Selangor), Sempam, Kg. Raja , Kuala Terla, and Robinson Falls (all in Pahang). In the 70s the main effort of hydropower development was concentrated on developing major hydropower projects not only to cater to the country increasing demand for electricity but also to the country needs for flood control. This development was feverishly carried out on the Perak River and the prohects built were Temenggor (384 MW), Bersia (72 MW), Kenering (20 MW), Sg Piah (70 MW) and the Kenyir (400 MW) project in Sungai Terengganu. In late 1970s, the government was keen to electrify the rural areas of Peninsular Malaysia and mini hydro power development was thought of as an option to provide electricity to these areas. The Mini Hydro Department of National Electricity Board (MHD) was then formed to undertake the task of planning, developing and implementing mini hydro projects to meet this government aspiration. Table 1 shows the list of projects identified and implemented and its status

  18. Real-time versus day-ahead market power in a hydro-based electricity market

    OpenAIRE

    Tangerås, Thomas P.; Mauritzen, Johannes

    2014-01-01

    We analyse in a theoretical framework the link between real-time and day-ahead market performance in a hydro-based and imperfectly competitive wholesale electricity market. Theoretical predictions of the model are tested on data from the Nordic power exchange, Nord Pool Spot (NPS).We reject the hypothesis that prices at NPS were at their competitive levels throughout the period under examination. The empirical approach uses equilibrium prices and quantities and does not rely on bid data nor o...

  19. Hydro, wind and solar power as a base for a 100% renewable energy supply for South and Central America.

    Directory of Open Access Journals (Sweden)

    Larissa de Souza Noel Simas Barbosa

    Full Text Available Power systems for South and Central America based on 100% renewable energy (RE in the year 2030 were calculated for the first time using an hourly resolved energy model. The region was subdivided into 15 sub-regions. Four different scenarios were considered: three according to different high voltage direct current (HVDC transmission grid development levels (region, country, area-wide and one integrated scenario that considers water desalination and industrial gas demand supplied by synthetic natural gas via power-to-gas (PtG. RE is not only able to cover 1813 TWh of estimated electricity demand of the area in 2030 but also able to generate the electricity needed to fulfil 3.9 billion m3 of water desalination and 640 TWhLHV of synthetic natural gas demand. Existing hydro dams can be used as virtual batteries for solar and wind electricity storage, diminishing the role of storage technologies. The results for total levelized cost of electricity (LCOE are decreased from 62 €/MWh for a highly decentralized to 56 €/MWh for a highly centralized grid scenario (currency value of the year 2015. For the integrated scenario, the levelized cost of gas (LCOG and the levelized cost of water (LCOW are 95 €/MWhLHV and 0.91 €/m3, respectively. A reduction of 8% in total cost and 5% in electricity generation was achieved when integrating desalination and power-to-gas into the system.

  20. Hydro, wind and solar power as a base for a 100% renewable energy supply for South and Central America.

    Science.gov (United States)

    Barbosa, Larissa de Souza Noel Simas; Bogdanov, Dmitrii; Vainikka, Pasi; Breyer, Christian

    2017-01-01

    Power systems for South and Central America based on 100% renewable energy (RE) in the year 2030 were calculated for the first time using an hourly resolved energy model. The region was subdivided into 15 sub-regions. Four different scenarios were considered: three according to different high voltage direct current (HVDC) transmission grid development levels (region, country, area-wide) and one integrated scenario that considers water desalination and industrial gas demand supplied by synthetic natural gas via power-to-gas (PtG). RE is not only able to cover 1813 TWh of estimated electricity demand of the area in 2030 but also able to generate the electricity needed to fulfil 3.9 billion m3 of water desalination and 640 TWhLHV of synthetic natural gas demand. Existing hydro dams can be used as virtual batteries for solar and wind electricity storage, diminishing the role of storage technologies. The results for total levelized cost of electricity (LCOE) are decreased from 62 €/MWh for a highly decentralized to 56 €/MWh for a highly centralized grid scenario (currency value of the year 2015). For the integrated scenario, the levelized cost of gas (LCOG) and the levelized cost of water (LCOW) are 95 €/MWhLHV and 0.91 €/m3, respectively. A reduction of 8% in total cost and 5% in electricity generation was achieved when integrating desalination and power-to-gas into the system.

  1. Analysis of the potential of small hydro-power installations - Preliminary study on hydro-power schemes on rivers; Programm Kleinwasserkraftwerke. Potenzialanalyse Kleinwasserkraftwerke - Vorstudie zu Kraftwerken an Fliessgewaessern

    Energy Technology Data Exchange (ETDEWEB)

    Baur, M.; Dettli, R. [econcept AG, Zuerich (Switzerland); Weingartner, R.; Viviroli, D.; Imhof, P.; Faessler, M.; Gerhardinger, H. [University of Berne, Geographisches Institut, Gruppe fuer Hydrologie (GIUB), Berne (Switzerland)

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results obtained from an analysis of the potential of small hydro-power installations in Switzerland. The current situation is reviewed and a 'bottom-up' analysis of the potential available is made. Data is presented on the potential of installations with power-ratings above and below 300 kW. Cantonal case-studies are examined. In a further 'top-down' examination, flow-rates and height-differences are looked at. The development of a 'potential-map' for Switzerland is described. The report is completed with the presentation of the conclusions made from the work. Suggestions for further work that could be done on the subject are made.

  2. Wind energy and Swiss hydro power; Windenergie und schweizerischer Wasserkraftpark

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Baur, M. [Econcept AG, Zuerich (Switzerland); Fritz, W.; Zimmer, Ch.; Feldmann, J. [Consentec, Consulting fuer Energiewirtschaft und -technik GmbH, Aachen (Germany); Haubrich, H.-J.; Dany, G.; Schmoeller, H.; Hartmann, T. [Institut fuer Elektrische Anlagen und Energiewirtschaft (IAEW), RWTH, Aachen (Germany)

    2004-07-01

    This report for the Swiss Federal Office of Energy (SFOE) examines the possibilities of using Switzerland's hydropower generation facilities as a means of control and as a capacity-reserve for a European power system that includes a considerable amount of wind-generated electricity. The aims of the study - the analysis of possible changes in power availability and of the relative importance of peak load compensation, economic optimisation potential for the use of Swiss hydropower and organisational aspects - are presented. Various methods for organising production timetables and trading are looked at, as are future developments in the European power market. Methods of assessment of the value of Swiss hydropower installations are discussed in detail and possibilities of increasing capacity are discussed. The report is concluded with recommendations on the participation of Swiss hydropower in the market for regulation energy and the development of associated strategies. Also, environmental aspects are examined and the influence of national wind-energy concepts are discussed.

  3. Comparison of simulated and measured response of load rejection on A hydro power plant model with mixed mode nonlinear controller

    Energy Technology Data Exchange (ETDEWEB)

    Babunski, Darko; Tuneski, Atanasko; Zaev, Emil [Faculty of Mechanical Engineering, ' Ss. Cyril and Methodius' University, Skopje (Macedonia, The Former Yugoslav Republic of)

    2014-07-01

    Revised Hydro Power Plant model of the IEEE working group recommended converted to state space model is used for simulation of transient response of hydro turbine, and verification was made using measurements of transients from real Hydro Power Plant (HPP). Nonlinear mixed model controller was designed and implemented into complete HPP simulation model and compared with PID with real parameters used in HPP, and with adjusted PID parameters with consideration of smallest frequency error. Verification of performance of the model was made comparing model response with measured load rejection, which is worst case of HPP operation. (Author)

  4. Storage and balancing synergies in a fully or highly renewable pan-European power system

    International Nuclear Information System (INIS)

    Rasmussen, Morten Grud; Andresen, Gorm Bruun; Greiner, Martin

    2012-01-01

    Through a parametric time-series analysis of 8 years of hourly data, we quantify the storage size and balancing energy needs for highly and fully renewable European power systems for different levels and mixes of wind and solar energy. By applying a dispatch strategy that minimizes the balancing energy needs for a given storage size, the interplay between storage and balancing is quantified, providing a hard upper limit on their synergy. An efficient but relatively small storage reduces balancing energy needs significantly due to its influence on intra-day mismatches. Furthermore, we show that combined with a low-efficiency hydrogen storage and a level of balancing equal to what is today provided by storage lakes, it is sufficient to meet the European electricity demand in a fully renewable power system where the average power generation from combined wind and solar exceeds the demand by only a few percent. - Highlights: ► We model a wind and solar based European power system with storage and balancing. ► We find that storage needs peaks when average renewable generation matches load. ► We find strong synergetic effects when combining storage and balancing. ► We study the effects of a storage capable of storing 6 h average use. ► We find a realisable fully renewable scenario based on wind, solar and hydro power.

  5. Hybrid solar and hydro-power for Austria

    Energy Technology Data Exchange (ETDEWEB)

    Weyss, N

    1978-02-01

    It is proposed that integrating solar powerplants into the Austrian electricity networks could cost less than conventional thermal plants, and provide a high degree of independence to the country. The following aspects are discussed; the seasonal distribution of sunshine, solar power plants, land requirements, economic feasibility, solar/fossil hybrid operation, integration strategy, Malta-B as a calculating unit, solar-hydraulic baseload throughout the year, concrete requirements, solar-hydraulic possibilities within the next 50 years, cement for solar plants, and energy accounting. (MHR)

  6. Modelling of thermo-hydro-mechanical couplings and damage of viscoplastic rocks in the context of radioactive waste storage

    International Nuclear Information System (INIS)

    Kharkhour, H.

    2002-12-01

    Trying to develop a model taking into account the complex rheology of a geologic media characterized by visco-plasticity, damage and thermo-hydro-mechanical couplings is unusual in geotechnics. This is not the case for radioactive waste storage that presents specificities from several viewpoints. Indeed, the scales of time and space concerned by this type of storage are disproportionate to those of civil engineering works or mines. Another specificity of the radioactive waste storage lies in the coupled processes involved. No effect likely to compromise the long-term security of the storage could be ignored. For example this is the case of damage, a phenomenon which does not necessarily lead to a major change of the mechanical behavior of the works but can influence the permeability of the medium in relation with a migration of radionuclides. It can be conceived that this phenomenon finds all its importance in the context of the thermo-hydro-mechanical couplings of a waste storage with high activity. However, the interaction between the damage and the THM coupled processes was the object of very few research subject up to now. This. is even more true for viscoplastic media considered as ductile, and therefore, less prone to cracking than brittle media. It is exactly in this 'original' but difficult context that took place the research presented in this report. This study was dedicated to the analysis of the phenomena and the thermal, hydraulic and mechanical couplings occurring in the near and far field of a high activity radioactive waste storage. Two examples of geological media were considered in this report: the clayey rock of Callovo-Oxfordian, called ' Argilites de l'Est ', target rock of the ANDRA project to carry out a subterranean laboratory for the study of long life radioactive waste storage; and the salt rock of the. subterranean laboratory in the old salt mine of Asse in Germany. (author)

  7. The contribution of small hydro power stations to the electricity generation in Greece: Technical and economic considerations

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2007-01-01

    Hydropower is the most widely used renewable energy source worldwide, contributing almost with 18.5% to the fulfillment of the planet electricity generation. However, most locations in Europe appropriate for the installation of large hydro power stations have already been exploited. Furthermore, there is a significant local communities' opposition towards new large power stations; hence, small hydro power stations remain one of the most attractive opportunities for further utilization of the available hydro potential. Greece and more precisely the country's mainland possesses a significant hydro-power potential which is up to now only partially exploited. In parallel, a large number of private investors have officially expressed their interest in creating small hydro power stations throughout the country, encouraged by the significant Greek State subsidy opportunities for renewable energy applications. However, up to now a relatively small number of projects have been realized, mainly due to decision-making problems, like the administrative bureaucracy, the absence of a rational national water resources management plan and the over-sizing of the proposed installations. Certainly, if the above problems are suitably treated, small hydro-power plants can be proved considerably profitable investments, contributing also remarkably to the national electricity balance and replacing heavy polluting lignite and imported oil. In the context of the above interesting issues, the present study reviews in detail the existing situation of small hydropower plants in Greece and investigates their future prospects as far as the energy, economic and environmental contribution are concerned

  8. Preliminary Feasibility Study of a Hybrid Solar and Modular Pumped Storage Hydro System at Biosphere 2

    Energy Technology Data Exchange (ETDEWEB)

    Lansey, Kevin [Univ. of Arizona, Tucson, AZ (United States); Hortsman, Chris [Univ. of Arizona, Tucson, AZ (United States)

    2016-10-01

    In this study, the preliminary feasibility of a hybrid solar and modular pumped storage system designed for high energy independence at Biosphere 2 is assessed. The system consists of an array of solar PV panels that generate electricity during the day to power both Biosphere 2 and a pump that sends water through a pipe to a tank at a high elevation. When solar power is not available, the water is released back down the pipe towards a tank at a lower elevation, where it passes through a hydraulic water turbine to generate hydroelectricity to power Biosphere 2. The hybrid system is sized to generate and store enough energy to enable Biosphere 2 to operate without a grid interconnection on an average day.

  9. Financial reporting for the Powersmart programs of British Columbia Hydro and Power Authority

    International Nuclear Information System (INIS)

    Morris, A.T.

    1990-01-01

    The Powersmart program at British Columbia Hydro seeks to minimize the short- and long-term energy costs to customers through the efficient or avoided use of electricity. In determining the overall financial reporting of Powersmart, four areas were reviewed in depth. The question of deferral or expensing of expenditures was examined with reference to accounting principles and industry practice in Canada and the USA. Discussion is provided on the costs that would be deferred, the amortization period of deferred expenses, and financial statement presentation. Deferral and amortization appear appropriate if the costs incurred are recoverable under future rates. The design, development, and implementation of power saving programs are outlined as well as the criteria for selection of an amortization period. At British Columbia Hydro, all Powersmart programs are treated as one type of expense and an amortization period of 7 years has been selected for all programs to simplify the accounting

  10. Combined Modular Pumped Hydro Energy Storage Plus Solar PV Proposal for Rio Rancho High School, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Bibeault, Mark Leonide [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-08-25

    This is a proposal to locate a combined Modular Pumped Hydro (MPH) Energy Storage plus PV solar facility at Rio Rancho High School, NM. The facility will functionally provide electricity at night derived from renewable solar energy. Additionally the facility will provide STEM related educational opportunities for students and staff of the school, public community outreach, and validation of an energy storage approach applicable for the Nation (up to 1,000,000 kWh per installation). The proposal will summarize the nature of electricity, why energy storage is useful, present the combined MPH and solar PV production design, present how the actual design will be built and operated in a sustainable manner, how the project could be funded, and how the project could be used in STEM related activities.

  11. Energy storage for power systems

    CERN Document Server

    Ter-Gazarian, Andrei

    2011-01-01

    The supply of energy from primary sources is not constant and rarely matches the pattern of demand from consumers. Electricity is also difficult to store in significant quantities. Therefore, secondary storage of energy is essential to increase generation capacity efficiency and to allow more substantial use of renewable energy sources that only provide energy intermittently. Lack of effective storage has often been cited as a major hurdle to substantial introduction of renewable energy sources into the electricity supply network.This 2nd edition, without changing the existing structure of the

  12. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  13. Integrity and life estimation of turbine runner cover in a hydro power plant

    Directory of Open Access Journals (Sweden)

    A. Sedmak

    2016-03-01

    Full Text Available This paper presents integrity and life estimation of turbine runner cover in a vertical pipe turbines, Kaplan 200 MW nominal output power, produced in Russia, and built in six hydro-generation units of hydroelectric power plant „Đerdap 1” in Serbia. Fatigue and corrosion-fatigue interaction have been taken into account using experimentally obtained material properties, as well as analytical and numerical calculations of stress state, to estimate appropriate safety factors. Fatigue crack growth rate, da/dN, was also calculated, indicated that internal defects of circular or elliptical shape, found out by ultrasonic testing, do not affect reliable operation of runner cover.

  14. Technology on the storage of laser power

    International Nuclear Information System (INIS)

    Urakawa, Junji

    2001-01-01

    I report the technology on the storage of laser power using Fabry-Perot Optical Cavity. This technology is applicable for the generation of high brightness X-ray with the combination of compact electron linac or small storage ring in which about 100 MeV electron beam with normalized emittance of 10 -5 m is controlled. The distance of two concave mirrors with high reflectivity is controlled within sub-nm is essential to keep the resonance condition for the storage of laser power. I also report the possibility on several kind of applications and the status of this technology. (author)

  15. Neuro-Fuzzy Computational Technique to Control Load Frequency in Hydro-Thermal Interconnected Power System

    Science.gov (United States)

    Prakash, S.; Sinha, S. K.

    2015-09-01

    In this research work, two areas hydro-thermal power system connected through tie-lines is considered. The perturbation of frequencies at the areas and resulting tie line power flows arise due to unpredictable load variations that cause mismatch between the generated and demanded powers. Due to rising and falling power demand, the real and reactive power balance is harmed; hence frequency and voltage get deviated from nominal value. This necessitates designing of an accurate and fast controller to maintain the system parameters at nominal value. The main purpose of system generation control is to balance the system generation against the load and losses so that the desired frequency and power interchange between neighboring systems are maintained. The intelligent controllers like fuzzy logic, artificial neural network (ANN) and hybrid fuzzy neural network approaches are used for automatic generation control for the two area interconnected power systems. Area 1 consists of thermal reheat power plant whereas area 2 consists of hydro power plant with electric governor. Performance evaluation is carried out by using intelligent (ANFIS, ANN and fuzzy) control and conventional PI and PID control approaches. To enhance the performance of controller sliding surface i.e. variable structure control is included. The model of interconnected power system has been developed with all five types of said controllers and simulated using MATLAB/SIMULINK package. The performance of the intelligent controllers has been compared with the conventional PI and PID controllers for the interconnected power system. A comparison of ANFIS, ANN, Fuzzy and PI, PID based approaches shows the superiority of proposed ANFIS over ANN, fuzzy and PI, PID. Thus the hybrid fuzzy neural network controller has better dynamic response i.e., quick in operation, reduced error magnitude and minimized frequency transients.

  16. Gas power production, surplus concepts and the transformation of hydro-electric rent into resource rent

    International Nuclear Information System (INIS)

    Amundsen, Eirik S.

    1997-01-01

    The paper considers the effects of introducing large scale gas power production capacity into an electricity sector based on hydropower. In this process the economic rent is transmitted from the hydro power sector to the resource rent in the gas power sector, but is along the way intermingled with ordinary producer surplus and quasi-rent stemming from increasing cost conditions in the production infrastructure and capacity constraints. The net effect on total rent generated depends on development in demand, demand elasticities, costs saved from delaying hydropower projects and the existence of producer surplus in gas power generation. The paper closes with a discussion of possible tax base changes following from the introduction of a thermal power system based on natural gas

  17. BC Hydro - IPC review : report on the creation of IPC International Power Corporation and its joint venture with the British Columbia Hydro and Power Authority for the Raiwind power project

    International Nuclear Information System (INIS)

    1997-03-01

    BC Hydro is one of the sponsors involved in the construction of a thermal electric power plant in Raiwind, Pakistan. As a Crown corporation, BC Hydro and its participation in the project is subject to the policies and priorities of the provincial government. This document describes the circumstances surrounding the creation of the International Power Corporation (IPC) and its joint venture with BC Hydro for the development of international power projects including the Raiwind project. The project has provoked much public discussion in British Columbia because of the involvement of Cayman Island companies in the project structure. There is concern with the intermingling of public and private interests in the project, including allegations that an IPC share offering benefited insiders of government and BC Hydro. A description of the history and structure of the Raiwind project and detailed information on the British Columbia participants is provided. Directors and shareholders of the principal corporate participants are listed. The development process in Pakistan, the key features of the project and the underlying agreements among the participants are described. An assessment of potential conflicts of interest and a review of public sector standards and guidelines regarding conflicts of interest is presented. 60 refs., 39 tabs., 6 figs

  18. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland

    International Nuclear Information System (INIS)

    2008-05-01

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18 th century. A permanent license to use at most 3 m 3 /s is available. The study concludes that the maximum flow rate of 6 m 3 /s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m 3 /s.

  19. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  20. Hydro-power installation on the Prascherbach, Nufenen, Switzerland; Wasserkraftwerk Prascherbach, Nufenen. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Marugg, R.

    2008-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) describes project variants for the replacement of an 80-year old hydro-power plant in Nufenen, Switzerland. Details on the new power station, which is to produce 300 kilowatts of electrical power using a height difference of 340 metres is to provide 1.3 million kilowatt-hours of electricity per year. The report reviews the history of the project, which goes back to the 1990s and describes the project approved in 1999 as well as the updates made afterwards. The financial aspects of the project and remuneration for the power generated are examined. Environmental issues connected with the project are also discussed. The proposed course of events involved in taking further steps toward the realisation of the installation are discussed. An appendix includes copies of the various documents pertaining to cost estimation, water quantities, environmental protection and the granting of building permission.

  1. Planning and running of the hydro aggregates in the electric power system in the R. Macedonia

    International Nuclear Information System (INIS)

    Ilijovski, Igor

    2015-01-01

    The subject of the research in this master thesis is analysis of the main characteristics and control of the large Hydropower plants (HPPs) in the electric power system in R. Macedonia, which are subject to planning in the running tables. ELEM and MEPSO are using SCADA system for monitoring and control of the hydropower plants. The planning is a complex process where many aspects should be covered. With correct and optimal control of the hydro aggregates, depending on the hydrology, climate, elevation of the reservoirs and many other conditions, a better efficiency of the water resources usage may be obtained, which results in positive financial outcomes. (author)

  2. Rebuilding the Chalberhoeni small hydro power station in Saanen, Switzerland; Chalberhoeni - Rapport Final

    Energy Technology Data Exchange (ETDEWEB)

    Cavin, G. [Stucky SA, Renens (Switzerland); Wagner, T. [Sigmaplan, Berne (Switzerland)

    2009-07-01

    These two final illustrated reports for the Swiss Federal Office of Energy (SFOE) deal with various aspects of the Chalberhoeni small hydro project in Saanen, Switzerland. The first report presents data on the catchment area involved, available head, residual water quantities, installed power and annual production figures. Investments and operating costs are looked at. The second report describes the project and discusses regional planning aspects, hydrological basics and environmental issues in connection with the renewal project, including details on invertebrates found in the stream and their relevance to fishing and nature protection issues.

  3. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    Energy Technology Data Exchange (ETDEWEB)

    Duran, Felicia Angelica [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.; Waymire, Russell L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.

    2013-10-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  4. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    International Nuclear Information System (INIS)

    Duran, Felicia Angelica; Waymire, Russell L.

    2013-01-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  5. An approach to the investment analysis of small and medium hydro-power plants

    Energy Technology Data Exchange (ETDEWEB)

    Forouzbakhsh, F. [University of Tehran (Iran). Faculty of Engineering; Hosseini, S.M.H. [Islamic Azad University, Tehran (Iran). Faculty of Engineering; Vakilian, M. [Sharif Institute of Technology, Tehran (Iran). Faculty of Electrical Engineering

    2007-02-15

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in ''Bookan, Iran'' and SHPP in ''Nari, Iran''), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially. (author)

  6. On the market of wind with hydro-pumped storage systems in autonomous Greek islands

    International Nuclear Information System (INIS)

    Caralis, G.; Zervos, A.; Rados, K.

    2010-01-01

    In autonomous islands, the wind penetration is restricted due to technical reasons related with the safe operation of the electrical systems. The combined use of wind energy with pumped storage (WPS) is considered as a mean to exploit the abundant wind potential, increase the wind installed capacity and substitute conventional peak supply. In this paper, the experience gained from the analysis of WPS in three specific islands is used towards the estimation of the WPS market in autonomous Greek islands. Parameterized diagrams and a methodology towards the pre-dimensioning and initial design of the WPS are proposed and used towards the estimation of the market in autonomous Greek islands. The objective is to make an initial general prefeasibility study of WPS prospects in the autonomous Greek islands. Results show that there is a significant market for WPS in Greece and the development cost of WPS is competitive to the fuel cost of local power stations in autonomous islands. (author)

  7. Replacement of the Farbtobel hydro power installation in Peist, Switzerland; Gemeinde Peist (GR). Neubau Wasserkraftwerk Farbtobel - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Scherrer, I.; Gadient, N.

    2009-12-15

    This illustrated report for the Swiss Federal Office of Energy (SFOE) deals with various aspects of a small hydro project in Peist, Switzerland. The report presents a project concerning the replacement of the existing Farbtobel small hydro installation. The catchment area involved, its hydrology, high-water considerations and river ecology are examined. The power station concept, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. Remuneration for the power produced through the Swiss cost-covering remuneration scheme is discussed.

  8. Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method

    Directory of Open Access Journals (Sweden)

    J. Li

    2018-06-01

    Full Text Available In this paper, to explore the efficiency and rationality of the cascade combined generation, a cascade combined optimal model with the maximum generating capacity is established, and solving the model by the modified GA-POA method. It provides a useful reference for the joint development of cascade hydro-power stations in large river basins. The typical annual runoff data are selected to calculate the difference between the calculated results under different representative years. The results show that the cascade operation of cascaded hydro-power stations can significantly increase the overall power generation of cascade and ease the flood risk caused by concentration of flood season.

  9. Accelerator magnet power supply using storage generator

    International Nuclear Information System (INIS)

    Karady, G.; Thiessen, H.A.

    1987-01-01

    Recently, a study investigated the feasibility of a large, 60 GeV accelerator. This paper presents the conceptual design of the magnet power supply (PS() and energy storage system. The main ring magnets are supplied by six, high-voltage and two, low-voltage power supplies. These power supplies drive a trapezoidal shaped current wave through the magnets. The peak current is 10 kA and the repetition frequency is 3.3 Hz. During the acceleration period the current is increased from 1040 A to 10,000 A within 50 msec which requires a loop voltage of 120 kV and a peak power of 1250 MW. During the reset period, the PS operates as an inverter with a peak power of -1250 MW. The large energy fluctuation necessitates the use of a storage generator. Because of the relatively high operation frequency, this generator operates in a transient mode which significantly increases the rotor current and losses. The storage generator is directly driven by a variable speed drive, which draws a practically constant power of 17 MW from the ac supply network and eliminates the pulse loading. For the reduction of dc ripple, the power supplies operate in a 24 pulse mode

  10. The application of the EMAS-ordinance to small hydro-power-plants

    International Nuclear Information System (INIS)

    Patek, R.

    2000-01-01

    The application of the eco-management and audit scheme ordinance to small hydro-power-plants deals with the possibility to take an environmental-relevant audition on sites of small hydro-power-plants to achieve the environmental EMAS-certificate. Within the realization of the acquired improvement steps also the efficiency of the power plants should be increased that the audit also becomes interesting in economic matters. Contents: after explaining the legal frame being prescribed by the European Community, its interpretation and relevance for the sites of SHP, common impacts of these on the environment are particularized. From these facts a valuation-catalogue has been developed, which will be used by the power plant-owners for the assessment of their sites to take part in the EMAS-system. This catalogue is split up into six modules, which comprise all possible valuation areas which can appear concerning the different kinds of plants. These modules are: MODUL A: backwater area; MODUL B: weir; MODUL C: powerhouse; MODUL D: tail water area; MODUL E: diversion channel / penstock; MODUL F: diversion section. Furthermore three submodules to gather common data concerning plant and river have been created. At the development of the catalogue there was particularly attached importance to a user-friendly application. The goal was to realize the valuation by the plant owners to minimize costs. To take objectiveness into account the module-catalogue was created in a way that auditors (the power plant owners) must not formulate specifications by themselves; the possible assessments only have to be marked with a cross at the corresponding parameters, which have been listed up. (author)

  11. Analysis of the spontaneous variations in wind power and necessary continuous regulation of hydro-electric and thermal power, related to a future Swedish power system

    Energy Technology Data Exchange (ETDEWEB)

    Holm, J O; Lindstrom, P O

    1982-09-01

    Wind power is unlike conventional electric power generation, since the output fluctuates uncontrollably. These fluctuations must be balanced by controlled generation from other power sources. This will create new and interesting demands on the reserves in the power system. The short-term fluctuations have a low simultaneity factor and must be balanced by an automatic frequency control reserve. In Sweden, this consists of automatically controlled hydro-electric power. The report contains calculations of the amount by which the demand on reserves will increase when wind power is introduced.

  12. Optimizing Hydro Power Turbines in Order to Secure the Passage of Fishes in Khuzestan province

    Directory of Open Access Journals (Sweden)

    Moona Mohammadi

    2015-04-01

    Full Text Available Nowadays,it is important to consider environmental issues,as ecological problems and their severe effect intensify in Iran,particularly in Khuzestan province.The environmental effects of hydroelectric plants are highly regarded due to their significant impact on an extensive area.The lack of safe path for fish passing through the turbines is one of these damages. In order to deal with these challenges,researchers are trying to optimize hydro power turbines.In this optimization,old runners were replaced,while conditions of fish passing through the turbines and fish survival have been improved.Considering the existence of six hydroelectric power plants in Khuzestan province,it would be possible to conduct optimization or constructing studies with a fish-friendly approach for the safe passage of fishes to slightly reduce the extent of environmental damages.

  13. Calibration of thermoluminescence skin dosemeter response to beta emitters found in Ontario Hydro nuclear power stations

    International Nuclear Information System (INIS)

    Walsh, M.L.; Agnew, D.A.; Donnelly, K.E.

    1984-01-01

    The response of the Ontario Hydro Thermoluminescence Dosimetry System to beta radiation in nuclear power station environments was evaluated. Synthetic beta spectra were constructed, based on activity samples from heat transport systems and fuelling machine contamination smears at nuclear power stations. Using these spectra and dosemeter energy response functions, an overall response factor for the skin dosemeter relative to skin dose at 7 mg.cm -2 was calculated. This calculation was done assuming three specific geometries: (1) an infinite uniformly contaminated plane source at a distance of 33 cm (50 mg.cm -2 total shielding) from the receptor; (2) an infinite cloud surrounding the receptor; (3) a point source at 33 cm. Based on these calculations, a conservative response factor of 0.7 has been chosen. This provides an equation for skin dose assignment, i.e. Skin Dose = 1.4 x Skin Dosemeter Reading when the skin dosemeter is directly calibrated in mGy(gamma). (author)

  14. OVERVIEW OF A NEW METHOD FOR DESIGNING HIGH EFFICIENCY SMALL HYDRO POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Milun Babić

    2010-01-01

    Full Text Available Significant number of research projects in the area of renewable energy sources (especially for small hydro power plants has been made within the Department for Energy and Process Engineering and Regional Euro Energy Efficiency Center at Faculty of Mechanical Engineering (University of Kragujevac, Serbia since early eighties. The results are various; numerous domestic and international recognition and technical performance tell about the success of the research. Research projects have been following the technical and technological development of research equipment and economy growth. This has led to the development of software for designing turbines of SHP plants. In order to notify the public about possibilities of our software, in this paper is briefly described a mathematical model and procedures for calculating and designing of SHPP for known conditions. As an argument for assessing the validity and potential of our research results is shown constructed SHP plant "Bosnia 1", 2 x 100 kW power.

  15. A new PID controller design for automatic generation control of hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Khodabakhshian, A.; Hooshmand, R. [Electrical Engineering Department, University of Isfahan (Iran)

    2010-06-15

    This paper presents a new robust PID controller for automatic generation control (AGC) of hydro turbine power systems. The method is mainly based on a maximum peak resonance specification that is graphically supported by the Nichols chart. The open-loop frequency response curve is tangent to a specified ellipse and this makes the method to be efficient for controlling the overshoot, the stability and the dynamics of the system. Comparative results of this new load frequency controller with a conventional PI one and also with another PID controller design tested on a multimachine power system show the improvement in system damping remarkably. The region of acceptable performance of the new PID controller covers a wide range of operating and system conditions. (author)

  16. Report and recommendations in the matter of British Columbia Hydro and Power Authority and an inquiry into a Heritage Contract for British Columbia Hydro and Power Authority's existing generation resources and regarding stepped rates and transmission access

    International Nuclear Information System (INIS)

    Hobbs, R.H.; Hall, K.L.; Bradley, P.G.

    2003-01-01

    Under British Columbia's new energy plan, the BC Utilities Commission made recommendations on two main policy initiatives regarding regulation of BC Hydro. The first involved a Heritage Contract that would ensure any benefits attributable to the existing low-cost generation of BC Hydro would be secured for British Columbians. The Heritage Contract had the support of all participants. The proposal was based on the revenue required by Generation to meet the cost of supplying the energy of Heritage Resources to Distribution. The second recommendation involved a stepped rate structure for large commercial and industrial customers to encourage a more efficient use of energy resources and private investments in new generation. It also recommends concurrent implementation of time-of-use rates. BC Hydro had also proposed a significant change in the determination and disposition of Trade Income between BC Hydro and Powerex. The agreement stipulated that Trade Income would no longer include revenues from the sale of surplus power, except for profits realized by Powerex after paying BC Hydro an indexed price for surplus power. All Trade income up to $200 million would accrue to the ratepayers. This report presents 3 alternatives to the Trade Income proposal and several others recommendations dealing with transmission voltage customers and generation access, legislation, regulation and special directions. The report identified a schedule for implementation of retail access by the end of 2004. 9 appendices

  17. Evaluation of the feasibility and viability of modular pumped storage hydro (m-PSH) in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Adam M. [Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States); Hadjerioua, Boualem [Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States); Martinez, Rocio [Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States); Bishop, Norm [Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    The viability of modular pumped storage hydro (m-PSH) is examined in detail through the conceptual design, cost scoping, and economic analysis of three case studies. Modular PSH refers to both the compactness of the project design and the proposed nature of product fabrication and performance. A modular project is assumed to consist of pre-fabricated standardized components and equipment, tested and assembled into modules before arrival on site. This technology strategy could enable m-PSH projects to deploy with less substantial civil construction and equipment component costs. The concept of m-PSH is technically feasible using currently available conventional pumping and turbine equipment, and may offer a path to reducing the project development cycle from inception to commissioning.

  18. Thermo-hydro mechanical modeling in unsaturated hard clay: application to nuclear waste storage

    International Nuclear Information System (INIS)

    Jia, Y.

    2006-07-01

    This work presents an elastoplastic damage model for argillite in unsaturated conditions. A short resume of experimental investigations is presented in the first part. The results obtained show an important plastic deformation coupled with damage induced by initiation and growth of microcracks. Influences of water content on the mechanical behaviour are also investigated. Based on experimental data and micro-mechanical considerations, a general constitutive model is proposed for the poro-mechanical behavior of argillite in unsaturated conditions. The time dependent creep has also been incorporated in they model. The performance of the model is examined by comparing numerical simulation with experimental data in various load paths under saturated and unsaturated conditions. Finally, the model is applied to hydro-mechanical coupling study of the REP experiment and thermo-hydro-mechanical coupling study of the HE-D experiment. A good agreement is obtained between experimental data and numerical predictions. It has been shown that the proposed model describe correctly the main features of the mechanical behaviour of unsaturated rocks. (author)

  19. Performance of a direct drive hydro turbine for wave power generation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Y-H; Kim, C-G [Division of Mechanical and Information Engineering, Korea Maritime University Dongsam-dong 1, Youngdo-ku, Busan, 606-791 (Korea, Republic of); Choi, Y-D; Kim, I-S [Department of Mechanical Engineering, Mokpo National University Muan-ro 560, Chunggye-myun, Jeonnam, 534-729 (Korea, Republic of); Hwang, Y-C, E-mail: lyh@hhu.ac.k [R and D Institute, Shinhan Precision Co. Ltd. Gomo-ri 313, Jinle-myun, Kimhae, 621-881 (Korea, Republic of)

    2010-08-15

    Clean and renewable energy technologies using ocean energy give us non-polluting alternatives to fossil-fueled power plants as a countermeasure against the global warming and growing demand for electrical energy. Among the ocean energy resources, wave power takes a growing interest because of its enormous amount of potential energy in the world. Therefore, various types of wave power system to capture the energy of ocean waves have been developed. However, suitable turbine type is not normalized yet because of relatively low efficiency of the turbine systems. The purpose of this study is to investigate the performance of a newly developed direct drive hydro turbine (DDT), which will be built in a caisson for wave power plant. Experiment and CFD analysis are conducted to clarify the turbine performance and internal flow characteristics. The results show that the DDT obtains fairly good turbine efficiency in both cases of with wave and no wave conditions. As the turbine performance is influenced considerably by the wave condition, designed point of the turbine should be determined according to the wave condition at an expected installation site. Most of the output power generates at the runner passage of the Stage 2.

  20. ExternE - valuation of hydro power in Klippen. Final report

    International Nuclear Information System (INIS)

    Nilsson, Maans

    1998-08-01

    ExternE is a pan E uropean project aimed at identifying and quantifying external effects from different energy production technologies around Europe. The Swedish implementation carried out case studies on a biomass plant, a coal plant and a hydro power plant. The conventional approach within the ExternE project is to estimate impacts for each priority pathway associated with the fuel cycle, and then economic methods to obtain estimates for the economic damage of each particular impact pathway. However, in the case of hydro power, it is generally not possible to estimate the most important impacts quantitatively. Therefore, a contingent valuation (CV) study was initiated. In a typical CV-study, a selection of individuals are asked to state their willingness to pay for a certain environmental improvement or to avoid an environmental damage. Welfare economic theory suggests that the well-being effects on people from a change from one situation to another can be measured as their willingness to pay or to accept an economic transaction for this change. Environmental services, such as those provided by a river system, are public services and have generally no market price, but the analyst can use people's stated preferences to determine the correct prices of environmental goods and services. The CV study was initiated to obtain an externality value for Klippens Kraftstation. The performed study was of Ex Ante type, which means estimating the values before the exploitation. For this purpose, a site similar to Klippen but without exploitation, was selected: Vojmaan. Three groups of respondents; the local population, the tourists, and the average Swede, were asked to state their perspective on hydro power development their WTP for preserving Vojmaan in its current condition. The results indicate that Locals and Tourists differ significantly from Swedes. The average willingness to pay is calculated from the respondents who absolutely will pay, and those who maybe pay. The

  1. Technological development with reference to hydro-power, nuclear, and alternative energy technologies

    Energy Technology Data Exchange (ETDEWEB)

    Burns, T R; Baumgartner, T

    1985-01-01

    This report outlines a theoretical framework for describing and analyzing the introduction of new technologies and the development of socio-technical systems associated with such innovations. While the report is largely theoretical in nature, it refers to certain strategic aspects of the development of nuclear, hydro-power and alternative energy systems. The ease with which technological innovation and development occur, the directions they take, and the impacts they have on the social and physical environments depend not only on purely technical and economic factors. Barriers, regulators and facilitators are inherent in the socio-political, institutional and cultural structures within which any attempts at innovation and technological development take place. The final section of the report explores some of the implications of the theory for policy and strategy, including consideration of environmental policy.

  2. A combined hydro-nuclear-solar project for electric power production

    International Nuclear Information System (INIS)

    Yiftah, S.

    1985-01-01

    Some of the main, general-perspective themes of Dr. Alvin Weinberg's leadership and long and varied work are: the effect of present and future nuclear energy projects on society, not only in the United States but throughout the world; analysis, comparison, and combination of various sources of energy; extensive multiple use of nuclear energy complexes (so-called NUPLEX, for nuclear complex) for various areas of the world; and use of ''Big Technology'' and ''Big Science'' for solving, or helping to solve, political problems. A combined hydro-nuclear-solar project for electric power production is discussed, as well as two other energy-related engineering projects. Some of the projects originated or were inspired by work done at the Oak Ridge National Laboratory under the leadership of Dr. Alvin Weinberg. Also reported are the technical characteristics and interrelationships of the three components of the envisaged hydronuclear-solar project

  3. The 'Lehn' small hydro-power station; KWKW Lehn Vorprojekt - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ruff, H.; Widmer, P.

    2009-02-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) takes a look at the refurbishment of a small hydro-power station in the UNESCO biosphere region in the Entlebuch, Switzerland. The five grounds for the refurbishment are examined - repair of the water intake, flood protection, regulation of residual water, reduction of floating debris and sand and optimisation of the system by using automatic control. Figures on the cost of the refurbishment and electricity production are presented and discussed, as is the economic viability of the project. The existing installations are described and the hydrology of the stream is discussed, as are legal requirements and technical basics. Variants for the refurbishment are examined and operational aspects are looked at. A comprehensive appendix provides details on the proposal in graphical and tabular form.

  4. Small hydro power project operating in cascade; Projeto de pequenas centrais hidreletricas operando em cascata

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Robson Siqueira Filadelfo dos [Minas Gerais Univ., Belo Horizonte (Brazil). Dept. de Engenharia Nuclear; Martinez, Carlos Barreira; Macedo, Alberto Amarante [Minas Gerais Univ., Belo Horizonte (Brazil). Dept. de Engenharia Hidraulica e Recursos Hidricos

    1999-07-01

    Small Hydro Power is a good option of generation mainly when they are located close to the consumers, because they demand smaller absolute value of invested capital and smaller time of maturation. Besides, the great repressed demand, mainly in the schedules of point, and the recovery of the values of the tariffs has been showed to private investor for this type of central. This paper develops a new method that allows to give agility to the study of small hydropower operating in cascade form in order to optimize the cost-benefit relationship of the enterprise. Approaches are presented for the evaluation of this type of system, the methodology of partition of falls and the proposed model. A case study, in which this method is applied, is shown at the end of this work. (author)

  5. Policy and regulatory framework conditions for small hydro power in Sub-Saharan Africa

    Energy Technology Data Exchange (ETDEWEB)

    Koelling, Fritz [Sustainable Energy and Environment, Karlsruhe (Germany); Gaul, Mirco; Schroeder, Miriam [SiNERGi Consultancy for Renewable Energies, Berlin (Germany)

    2011-07-01

    The vast potential of mini and micro hydro power (MHP) in Sub-Saharan African countries is one promising option to cover increasing energy demand and to enable electricity access for remote rural communities. Based on the analysis of 6 African countries (Ethiopia, Kenya, Mozambique, Nigeria, Rwanda, South Africa), this study sheds light on some of the main barriers on the level of political and regulatory framework conditions which include gap between the national-level policies and regulations and local MHP project implementation, lack of financing and limited capacities for project planning, building and operation. The paper also identifies some promising practices employed in several SSA countries of how to overcome these barriers and concludes with recommendations of how to create positive feed-backs between ambitious policies and regulations and MHP financing and capacity development needs in order to scale up MHP deployment and MHP sector development. (orig.)

  6. Realising the potential for the protection of the environment by developing small hydro power

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, R.; Heal, A.

    2000-07-01

    The RAPPIDS project was set up to tackle the conflicts arising from the development of Small Hydro Power (SHP) in sensitive and fragile environments. The project was focused on Snowdonia National Park, which was identified as a conflict area in the UK. The aim was to develop a strategy to overcome these conflicts locally through: improving the understanding of market actors, of the effects of SHP on the environment; improving dialogue between market actors; initiating collaboration to analyse the environmental impacts and test innovative technological measures for sensitive SHP development; Identifying successful environmental measures and assessing their suitability for transfer to other regions; raising the awareness of market actors, of the environmental benefits of SHP. The project in the UK was mirrored in 2 regions of Europe, under the EU Altener programme, and lessons learnt were shared between regions. (author)

  7. Regulation of the wind power production. Contribution of the electric vehicles and other energy storage systems

    Energy Technology Data Exchange (ETDEWEB)

    Mateus, Carlos B. [Instituto de Meteorologia, Lisboa (Portugal); Estanqueiro, Ana [INETI/LNEG - National Laboratory for Energy and Geology, Lisbon (Portugal)

    2012-07-01

    The increase in penetration of variable renewable energy sources (RES) introduced additional difficulties regarding the management of the Portuguese Power System. This is mainly due to the high temporal variability and low controllability, characteristics of these kinds of sources. There is a real need to reduce the impact of non-dispatchable RES sources; maximizing their penetration and minimizing curtailment. This is especially true for wind power and run-of-the-river hydro (ROR); as it appears beneficial to combine their variable production with added capacity of energy storage and demand side management; thereby increasing the flexibility of the power system as a whole. This paper aims to assess the excess wind generation (and other non-dispatchable sources); this for periods of production's excess in a 2020 timeframe, and assuming different weather scenarios. The adjustment of wind power generation (WPG) profile to the load profile is also addressed; the result is computed in the form of the value of the energy temporally deferred, using Pumped Hydro Storage (PHS) power plants as well as electric Vehicles (EVs). (orig.)

  8. 77 FR 47622 - TransCanada Hydro Northeast Inc.; FirstLight Power Resources; Notice of Environmental Site Review

    Science.gov (United States)

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1892-000 New Hampshire-Vermont; Project No. 1855-000 New Hampshire-Vermont; Project No. 1904-000 New Hampshire-Vermont; Project No. 2485-000 Massachusetts; Project No. 1889-000 Massachusetts] TransCanada Hydro Northeast Inc.; FirstLight Power Resources; Notice of Environmenta...

  9. 77 FR 37031 - Don W. Gilbert Hydro Power, LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2012-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14367-001] Don W. Gilbert... No.: 14367-001. c. Date filed: May 30, 2012. d. Applicant: Don W. Gilbert Hydro Power, LLC. e. Name... Utility Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708.] h. Applicant Contact: Don W. Gilbert and...

  10. On the Use of Energy Storage Technologies for Regulation Services in Electric Power Systems with Significant Penetration of Wind Energy

    DEFF Research Database (Denmark)

    Yang, Bo; Makarov, Yuri; Desteese, John

    2008-01-01

    Energy produced by intermittent renewable resources is sharply increasing in the United States. At high penetration levels, volatility of wind power production could cause additional problems for the power system balancing functions such as regulation. This paper reports some partial results...... and frequently changing regulation signal. Several energy storage options have been analyzed based on thirteen selection criteria. The evaluation process resulted in the selection of flywheels, pumped hydro electric power (or conventional hydro electric power) plant and sodium sulfur or nickel cadmium batteries...... of a project work, recently conducted by the Pacific Northwest National Laboratory (PNNL) for Bonneville Power Administration (BPA). The project proposes to mitigate additional intermittency with the help of Wide Area Energy Management System (WAEMS) that would provide a two-way simultaneous regulation service...

  11. Preliminary study on the reactivation of the WERAP small hydro power station in Bubikon

    International Nuclear Information System (INIS)

    Bretscher, A.; Gutzwiller, S.

    2003-01-01

    This study on the revitalisation of a small hydro power station belonging to old spinning mill in Bubikon, Switzerland, proposes ideas for the reactivation of an old hydropower installation that once helped power a spinning mill. Details are given on the history of the mill and the hydrological conditions to be expected at the site. Three variants are proposed for the refurbishment, including the revision of the power station's existing 44 kW Francis turbine dating from 1908, the addition of further, similar Francis turbine or its replacement with a new 61 kW Francis turbine. The costs and amortisation of the refurbishment variants are examined, the revenues that can be expected from its operation and other financial factors are discussed. Further, environmental and legal aspects of the project are examined and suggestions are made for the next steps to be taken towards the realisation of this small hydropower plant. An annex provides photographs of the location and the power station's equipment

  12. Nuclear power reactors and hydrogen storage systems

    International Nuclear Information System (INIS)

    Ibrahim Aly Mahmoud El Osery.

    1980-01-01

    Among conclusions and results come by, a nuclear-electric-hydrogen integrated power system was suggested as a way to prevent the energy crisis. It was shown that the hydrogen power system using nuclear power as a leading energy resource would hold an advantage in the current international situation as well as for the long-term future. Results reported provide designers of integrated nuclear-electric-hydrogen systems with computation models and routines which will allow them to explore the optimal solution in coupling power reactors to hydrogen producing systems, taking into account the specific characters of hydrogen storage systems. The models were meant for average computers of a type easily available in developing countries. (author)

  13. Cost determination of the electro-mechanical equipment of a small hydro-power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ogayar, B.; Vidal, P.G. [Grupo de Investigacion IDEA, Escuela Politecnica Superior, University of Jaen, Campus de Las Lagunillas, s/n. 23071-Jaen (Spain)

    2009-01-15

    One of the most important elements on the recovery of a small hydro-power plant is the electro-mechanical equipment (turbine-alternator), since the cost of the equipment means a high percentage of the total budget of the plant. The present paper intends to develop a series of equations which determine its cost from basic parameters such as power and net head. These calculations are focused at a level of previous study, so it will be necessary to carry out the engineering project and request a budget to companies specialized on the construction of electro-mechanical equipment to know its cost more accurately. Although there is a great diversity in the typology of turbines and alternators, data from manufacturers which cover all the considered range have been used. The above equations have been developed for the most common of turbines: Pelton, Francis, Kaplan and semiKaplan for a power range below 2 MW. The obtained equations have been validated with data from real installations which have been subject to analysis by engineering companies working on the assembly and design of small plants. (author)

  14. The Environmental Impact Study Of Micro Hydro Power In Pekalongan Indonesia

    Directory of Open Access Journals (Sweden)

    Suwarto

    2018-01-01

    Full Text Available Curugmuncar II micro hydro power (MHP located in Petungkriyono sub district is one of three MHPs installed in Pekalongan district. This study aims to analyze the MHP operation environmental impact. The study used qualitative method, with interviews, observations, and material testing. The data used are primary and secondary data. This research was conducted in Curugmuncar Village, Petungkriyono Subdistrict, Pekalongan Regency, Indonesia. MHP has power capacity of 100 KW with power usage of 50 KW. MHP used by 155 users with load capacity 2 A 220 volt AC. The community more used of lights as the houses and street lighting. The MHP operation had several environmental factors such as: sociology, technically feasible, hydrology, physical and chemical water quality, ergonomics, economically feasible, irrigation, clean water supply, government policy, and others. The supporting factors sustainability of MHP were sociology, irrigation, ergonomics, clean water supply, physical and chemical water quality, hydrology, and government policy. The inhibiting factors of MHP operation were technically feasible, economically feasible, and government policy. The results showed that the MHP environment requires a professional management system to achieve the MHP sustainability

  15. The Environmental Impact Study Of Micro Hydro Power In Pekalongan Indonesia

    Science.gov (United States)

    Suwarto; Hadi, Sudharto P.; Hermawan

    2018-02-01

    Curugmuncar II micro hydro power (MHP) located in Petungkriyono sub district is one of three MHPs installed in Pekalongan district. This study aims to analyze the MHP operation environmental impact. The study used qualitative method, with interviews, observations, and material testing. The data used are primary and secondary data. This research was conducted in Curugmuncar Village, Petungkriyono Subdistrict, Pekalongan Regency, Indonesia. MHP has power capacity of 100 KW with power usage of 50 KW. MHP used by 155 users with load capacity 2 A 220 volt AC. The community more used of lights as the houses and street lighting. The MHP operation had several environmental factors such as: sociology, technically feasible, hydrology, physical and chemical water quality, ergonomics, economically feasible, irrigation, clean water supply, government policy, and others. The supporting factors sustainability of MHP were sociology, irrigation, ergonomics, clean water supply, physical and chemical water quality, hydrology, and government policy. The inhibiting factors of MHP operation were technically feasible, economically feasible, and government policy. The results showed that the MHP environment requires a professional management system to achieve the MHP sustainability

  16. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  17. Swiss pumped hydro storage potential for Germany's electricity system under high penetration of intermittent renewable energy

    NARCIS (Netherlands)

    van Meerwijk, Aagje J. H.; Benders, Reinerus; Davila-Martinez, Alejandro; Laugs, Gideon A. H.

    2016-01-01

    In order to cut greenhouse-gas emissions and increase energy security, the European Commission stimulates the deployment of intermittent renewable energy sources (IRES) towards 2050. In an electricity system with high shares of IRES implemented in the network, energy balancing like storage is needed

  18. Thermo-hydro-chemical performance assessment of CO2 storage in saline aquifer

    International Nuclear Information System (INIS)

    Le Gallo, Y.; Trenty, L.; Michel, A.

    2007-01-01

    Research and development methodologies for the storage of CO 2 in geological formation are in developing over the last 10 years. In this context, numerical simulators are the practical tools to understand the physical processes involved by acid gas injection and evaluate the long term stability of the storage. CO 2 storage models can be seen as a mix between two types of models: a reservoir model coupling multiphase flow in porous media with local phase equilibrium and a hydrogeochemical model coupling transport in aqueous phase with local chemical equilibrium and kinetic reaction laws. A 3D-multiphase model, COORES, was built to assess the influence of different driving forces both hydrodynamic and geomechanics as well as geochemical on the CO 2 plume behavior during injection and storage (1000 years). Different coupling strategies were used to model these phenomena: - pressure, temperature and diffusion are solved implicitly for better numerical stability; - geochemical reactions involve heterogeneous kinetically-controlled reactions between the host rock and the CO 2 -rich aqueous phase which imply an implicit coupling with fluid flow; From the assumed initial mineral composition (6 minerals), aqueous species (10 chemical elements and 37 aqueous species), the geochemical alteration of the host rocks (sand and shale) is directly linked with the CO 2 plume evolution. A performance assessment using an experimental design approach is used to quantify the different driving forces and parameter influences. In the case of CO 2 injection in a saline quartz rich aquifer used to illustrate the model capabilities, the geochemical changes of the host rock have a small influence on the CO 2 distribution at the end of storage life (here 1000 years) compared to the other hydrodynamic mechanisms: free CO 2 (gas or supercritical), or trapped (capillary and in-solution). (authors)

  19. Negotiating river ecosystems: Impact assessment and conflict mediation in the cases of hydro-power construction

    International Nuclear Information System (INIS)

    Karjalainen, Timo P.; Jaervikoski, Timo

    2010-01-01

    In this paper we discuss how the legitimacy of the impact assessment process is a key issue in conflict mediation in environmental impact assessment. We contrast two EIA cases in hydro-power generation plans made for the Ii River, Finland in different decades, and evaluate how impact assessment in these cases has contributed to the creation, mediation and resolution of conflicts. We focus on the elements of distributional and procedural justice that made the former EIA process more legitimate and consensual and the latter more conflictual. The results indicate that it is crucial for conflict mediation to include all the values and interests of the parties in the goal-setting process and in the definition and assessment of alternatives. The analysis also indicates that procedural justice is the most important to help the people and groups involved to accept the legitimacy of the impact assessment process: how different parties and their values and interests are recognized, and how participation and distribution of power are organized in an impact assessment process. It is confirmed in this article that SIA may act as a mediator or a forum providing a process through which competing knowledge claims, various values and interests can be discussed and linked to the proposed alternatives and interventions.

  20. Rainfall prediction using fuzzy inference system for preliminary micro-hydro power plant planning

    Science.gov (United States)

    Suprapty, B.; Malani, R.; Minardi, J.

    2018-04-01

    East Kalimantan is a very rich area with water sources, in the form of river streams that branch to the remote areas. The conditions of natural potency like this become alternative solution for area that has not been reached by the availability of electric energy from State Electricity Company. The river water in selected location (catchment area) which is channelled to the canal, pipeline or penstock can be used to drive the waterwheel or turbine. The amount of power obtained depends on the volume/water discharge and headwater (the effective height between the reservoir and the turbine). The water discharge is strongly influenced by the amount of rainfall. Rainfall is the amount of water falling on the flat surface for a certain period measured, in units of mm3, above the horizontal surface in the absence of evaporation, run-off and infiltration. In this study, the prediction of rainfall is done in the area of East Kalimantan which has 13 watersheds which, in principle, have the potential for the construction of Micro Hydro Power Plant. Rainfall time series data is modelled by using AR (Auto Regressive) Model based on FIS (Fuzzy Inference System). The FIS structure of the training results is then used to predict the next two years rainfall.

  1. Reliability database development and plant performance improvement effort at Korea Hydro and Nuclear Power Co

    International Nuclear Information System (INIS)

    Oh, S. J.; Hwang, S. W.; Na, J. H.; Lim, H. S.

    2008-01-01

    Nuclear utilities in recent years have focused on improved plant performance and equipment reliability. In U.S., there is a movement toward process integration. Examples are INPO AP-913 equipment reliability program and the standard nuclear performance model developed by NEI. Synergistic effect from an integrated approach can be far greater than as compared to individual effects from each program. In Korea, PSA for all Korean NPPs (Nuclear Power Plants) has been completed. Plant performance monitoring and improvement is an important goal for KHNP (Korea Hydro and Nuclear Power Company) and a risk monitoring system called RIMS has been developed for all nuclear plants. KHNP is in the process of voluntarily implementing maintenance rule program similar to that in U.S. In the future, KHNP would like to expand the effort to equipment reliability program and to achieve highest equipment reliability and improved plant performance. For improving equipment reliability, the current trend is moving toward preventive/predictive maintenance from corrective maintenance. With the emphasis on preventive maintenance, the failure cause and operation history and environment are important. Hence, the development of accurate reliability database is necessary. Furthermore, the database should be updated regularly and maintained as a living program to reflect the current status of equipment reliability. This paper examines the development of reliability database system and its application of maintenance optimization or Risk Informed Application (RIA). (authors)

  2. Potentials for development of hydro-powered water desalination in Jordan

    International Nuclear Information System (INIS)

    Akash, B.A.; Mohsen, M.S.

    1998-01-01

    Due to the increase in population and development in agriculture, Jordan will deplete all of its renewable sources of fresh water in the next few years. On the other hand, the level of the Dead Sea has been falling at a high rate for the past three decades, due to the diversion of water from the Jordan River for irrigation. The solution to these issues could be in finding other alternatives such as the development of hydro-powered water desalination plant. Desalted water would be produced in order to make up for the shortage of fresh water using membrane technology, and thus reserve fresh ground water for future generations. This paper finds, on an annual basis, that about 2133 million cubic meters (MCM) of water can be drawn from the Red Sea. The power generated due to difference in elevation is used to desalinate Red Sea water. About 533 MCM of fresh water is produced in such a process. The brine, which is about 1600 MCM, is discharged into the Dead Sea. (author)

  3. Thermo-hydro-mechanical modelling of fractured rock masses application to radioactive wastes storage

    International Nuclear Information System (INIS)

    Vuillod, E.

    1995-01-01

    This work belongs to the Decovalex project (international cooperative project for the development of coupled models and their validation against experiments in nuclear waste isolation) of thermo-hydro-mechanical (THM) modeling of fractured rock massifs inside which high level radioactive waste disposal sites are simulated. The mathematical laws controlling the behaviour of the environment are resolved analytically in the case of a continuous environment (definition of an equivalent environment) and numerically if the environment is discontinuous (modeling of joints behaviour). The coupled THM models strongly influence the behaviour of a model. Modeling performed with the UDEC code shows the importance of HM couplings depending on whether the calculations are made in permanent or transient regime, and the influence of the loading path in the case of TM modeling. The geometry of fractures also influences the behaviour of the model. Studying the connexity of a fractures network allows to determine its degree of homogeneity. The comparison between two methods, continuous environment and discontinuous environment, has been carried out by determining the permeability tensor and the stress-deformation relations on fractured test-samples. It shows the differences in behaviour between an homogenized environment and a discrete environment. Finally two exercises of THM modeling of radioactive waste disposal sites illustrate the researches carried out. A far field model has permitted to compare the results obtained with calculation codes using different logics. The second model, a near field one, focusses more on the importance played by fracturing on the behaviour of the massif. The high density of the reference network has required some mathematical developments, in order to determine the representative equivalent volume (continuous approaches), and some mathematical analyses, to correctly simplify the environment (discontinuous approaches). These methods and analyses are

  4. Hydropower projects financing through the public private partnership a future powered by hydro

    International Nuclear Information System (INIS)

    Oprea, Traian; Teleanu, Mihai; Dobrescu, Dan

    2004-01-01

    /////In the frame of economy type that characterized Romania before 1990, the infrastructure and public utilities development, from which the hydropower sector is integral part, was ensured from public funds. The power generation belongs to the public services, which make profits on an average or long terms, in the benefit of the society. The demand for these services is increasing because of both economical increasing and the private sector weight in economy increasing. But, the quality increasing of these services needs investments, that is access to the long-term loans. Romanian banks are not prepared for long-run loans, and the international agencies don't have sufficient investment funds for all necessary projects. One of the options is or, could be, the transfer of entirely responsibility for infrastructure in the private sector hands, but this is not feasible in many cases. For this reason the government can choose a middle way realizing a private public partnership for solving the problem of the investment funds. In a general manner, this scenario consists in the fact of appealing to the private sector to finance, build and operate, for a limited period, an infrastructure, power or tourism project, necessary to the development. The impact zone between the public sector interest and private sector interest defined the concept of 'private public partnership' in its multiple alternatives (BOT, BOO, BOOT, ROT, etc.). The first official mentioning of a project in private public development under the name of BOOT 'Build, Own, Operate, Transfer' has been used in Turkey, in 1984, by the prime-minister ever since, Turgut Ozal, as part of a huge development program through the privatization in the power sector, infrastructure and tourism. The 'private public partnership' concept was studied and promoted, beginning with '95 years by the European Community too, with the view of this financing model utilization to the infrastructure projects development. One of the most

  5. Modelling energy production by small hydro power plants in collective irrigation networks of Calabria (Southern Italy)

    Science.gov (United States)

    Zema, Demetrio Antonio; Nicotra, Angelo; Tamburino, Vincenzo; Marcello Zimbone, Santo

    2017-04-01

    The availability of geodetic heads and considerable water flows in collective irrigation networks suggests the possibility of recovery potential energy using small hydro power plants (SHPP) at sustainable costs. This is the case of many Water Users Associations (WUA) in Calabria (Southern Italy), where it could theoretically be possible to recovery electrical energy out of the irrigation season. However, very few Calabrian WUAs have currently built SHPP in their irrigation networks and thus in this region the potential energy is practically fully lost. A previous study (Zema et al., 2016) proposed an original and simple model to site turbines and size their power output as well as to evaluate profits of SHPP in collective irrigation networks. Applying this model at regional scale, this paper estimates the theoretical energy production and the economic performances of SHPP installed in collective irrigation networks of Calabrian WUAs. In more detail, based on digital terrain models processed by GIS and few parameters of the water networks, for each SHPP the model provides: (i) the electrical power output; (iii) the optimal water discharge; (ii) costs, revenues and profits. Moreover, the map of the theoretical energy production by SHPP in collective irrigation networks of Calabria was drawn. The total network length of the 103 water networks surveyed is equal to 414 km and the total geodetic head is 3157 m, of which 63% is lost due to hydraulic losses. Thus, a total power output of 19.4 MW could theoretically be installed. This would provide an annual energy production of 103 GWh, considering SHPPs in operation only out of the irrigation season. The single irrigation networks have a power output in the range 0.7 kW - 6.4 MW. However, the lowest SHPPs (that is, turbines with power output under 5 kW) have been neglected, because the annual profit is very low (on average less than 6%, Zema et al., 2016). On average each irrigation network provides an annual revenue from

  6. Feasibility study for the partial conversion of a hydropower plant into a pumped-storage power plant: a case study of hydroelectric power plant La Barca (Asturias, Spain

    Directory of Open Access Journals (Sweden)

    E. Antuña Yudego

    2017-01-01

    Full Text Available Renewable energy sources have reported an unprecedented increase of global installed renewable power capacity. Against the advantages provided by this renewable power generation technology it should be taken into account an important issue: these intermittent energy sources supply a fluctuating output which is difficult to manage. Pumped-storage hydro power plants reappear in these circumstances as an efficient form of energy storage which allows to use reserves when necessary, enabling power generation output to cover continuously this energy demand. The present paper shows a simplified feasibility study of the partial conversion of hydropower plant La Barca, in Asturias, into a reversible storage through the development of an algorithm to simulate its operation according to electricity market prices. For this purpose, the operation in the deviation management market is considered and the technical modifications required for the conversion are shown. The estimation of costs and incomes present a feasible scenario.

  7. Assessment of the impact of the Kruonis hydro pumped storage on the ichtyocenosis of the Kaunas water reservoir

    International Nuclear Information System (INIS)

    Valushiene, V.; Gerulaitis, A.; Repechka, R.

    1996-01-01

    During the exploitation period (1992-1993) of one hydroagregate unit of the Kruonis Hydro Pumped Storage (HPS) the lower basin of the Kaunas Water Reservoir (Kauno Marios) fish species, their dimensions and age were found to change insignificantly as compared with the background data of the previous years (1989-1991). These changes can be associated with the peculiarities of natural conditions. At the current velocity 9-10 cm/s the penetration of young fish and their larvae into the hydroagregates of HPS was observed. At the end of summer, the abundance of fish larvae in the reverse canal before the unit started operating made up 41.3, during the pumping period - 51.3, at discharge time - 30.5 spec./100 m 3 . The greater part of the 'pumped in' fish accumulated in the upper basin. The rest ones, having passed through aggregates, penetrated into the reverse canal and came back into the lower basin. When operating one unit at the regime of 'pump', the injuries of young fish do not exceed 3-5%. The larger the fish the more often the injuries. The main injuries were mechanical or associated with fluctuations of pressure. 12 refs., 4 figs

  8. An Extended VIKOR-Based Approach for Pumped Hydro Energy Storage Plant Site Selection with Heterogeneous Information

    Directory of Open Access Journals (Sweden)

    Yunna Wu

    2017-08-01

    Full Text Available The selection of a desirable site for constructing a pumped hydro energy storage plant (PHESP plays a vital important role in the whole life cycle. However, little research has been done on the site selection of PHESP, which affects the rapid development of PHESP. Therefore, this paper aims to select the most ideal PHESP site from numerous candidate alternatives using the multi-criteria decision-making (MCDM technique. Firstly, a comprehensive evaluation criteria system is established for the first time. Then, considering quantitative and qualitative criteria coexist in this system, multiple types of representations, including crisp numerical values (CNVs, triangular intuitionistic fuzzy numbers (TIFNs, and 2-dimension uncertain linguistic variables (2DULVs, are employed to deal with heterogeneous criteria information. To determine the weight of criteria and fully take the preference of the decision makers (DMs into account, the analytic hierarchy process (AHP method is applied for criteria weighting. After that, an extended Vlsekriterijumska Optimizacija I Kompromisno Resenje (VIKOR method is utilized to provide compromise solutions for the PHESP site considering such heterogeneous information. At last, the proposed model is then applied in a case study of Zhejiang province, China to illustrate its practicality and efficiency. The result shows the Changlongshan should be selected as the optimal PHESP.

  9. The effectiveness of new austrian tunnelling method (NATM for hydro power plant construction: lau gunung power plant, north sumatera, indonesia

    Directory of Open Access Journals (Sweden)

    Ade Khoir Rizki

    2017-01-01

    Full Text Available Hydro Electric Power Plant is a power generating system using gravity fall of water as the main force to move the turbine and generate electricity. The construction purpose of Lau Gunung hydropower (2×7. 5 MW that is located in Dairi, North Sumatra, is to Supply power to 14,000 house of the surrounding region. The river run-off system, where the water is immediately contained and then flowed through a tunnel considering the discharge flowing river, where it is constant and does not occur in the fluctuating water level. The Lau Gunung river has the minimum flow that can exceed from 15 to 25 m3/s with a high tunnel dimensions of 4 metres long, 3,9 metres wide and a length of 1,6 kilometres. In terms of the analysis of the time effectiveness of the NATM can be saved because of the continuous work of 24 hours, without any obstacles in which the sub methods used include the drilling & blasting. The tunnel then use the form of steel reinforcement rib and Safety shotcrete lining. The general review may show that using NATM result a tremendous savings, also the use of horse shape conduce small displacement which is effective for the construction.

  10. Analysis and assessment of environmental impacts of small hydro power plant in Slovakia

    Science.gov (United States)

    Zeleňáková, M.; Fijko, R.; Remeňáková, I.

    2017-10-01

    Environmental impact assessment (EIA) is an important process that, prior to approval of the investment plan, can provide a detailed examination of the likely and foreseeable impacts of proposed construction activity on the environment. The objective of this paper is to apply a specific methodology for the analysis and evaluation of the environmental impacts of selected constructions, namely, small hydro power plant, using matrix of impacts. This analysis method is intended not only to increase the clarity and precision of the evaluation process, but also to align it with the requirements of the environmental impact assessment system. This modification should improve the reliability of the environmental impact assessment, and could moreover also be applied to other infrastructure projects. Comparison of alternatives and designation of the optimal variant are implemented based on selected criteria that objectively describe the characteristic lines of the planned alternatives of activity and their impact on the environment. The use of proper EIA procedures can help the decision-makers to formulate proper activities based on qualified decisions. The designed project in Spišské Bystré, Slovakia is used as a case study to clarify and exemplify the methodology and techniques.

  11. Hydro power projects- boon or bane for the rural communities of Western Himalayas

    Directory of Open Access Journals (Sweden)

    Jolli Virat

    2017-06-01

    Full Text Available A survey based questionnaire research was conducted in Sainj Valley, Himachal Pradesh. The survey was conducted in June-July 2015 in an area affected due to hydro power projects (HPPs. A total of 48 individuals participated in the survey. Based on survey questionnaire, it was found that native rural people perceived that HPPs had significantly brought positive change in life of native people and were therefore in favour of HPPs. However, large section of native people had not been benefited of HPPs. The decline in agriculture production, change in cropping pattern and poor access of water to native people were some of the negative implications of these projects. The dependence of native people on forest resources has not declined much and still number of local individuals depends on forest resources to supplement their income. Though, in current scenario people has benefited from such projects, however it is not known if it will be sustained for long time due to current unsustainable agriculture practices and limited employment opportunities. Moreover, Government should provide adequate compensation to the affected individuals by either providing a suitable land for agriculture or employment under various rural sector schemes.

  12. On the Profitability of Variable Speed Pump-Storage-Power in Frequency Restoration Reserve

    Science.gov (United States)

    Filipe, Jorge; Bessa, Ricardo; Moreira, Carlos; Silva, Bernardo

    2017-04-01

    The increase penetration of renewable energy sources (RES) into the European power system has introduced a significant amount of variability and uncertainty in the generation profiles raising the needs for ancillary services as well as other tools like demand response, improved generation forecasting techniques and changes to the market design. While RES is able to replace energy produced by the traditional centralized generation, it cannot displace its capacity in terms of ancillary services provided. Therefore, centralized generation capacity must be retained to perform this function leading to over-capacity issues and underutilisation of the assets. Large-scale reversible hydro power plants represent the majority of the storage solution installed in the power system. This technology comes with high investments costs, hence the constant search for methods to increase and diversify the sources of revenue. Traditional fixed speed pump storage units typically operate in the day-ahead market to perform price arbitrage and, in some specific cases, provide downward replacement reserve (RR). Variable speed pump storage can not only participate in RR but also contribute to FRR, given their ability to control its operating point in pumping mode. This work does an extended analysis of a complete bidding strategy for Pumped Storage Power, enhancing the economic advantages of variable speed pump units in comparison with fixed ones.

  13. Evaluating short-term hydro-meteorological fluxes using GRACE-derived water storage changes

    Science.gov (United States)

    Eicker, A.; Jensen, L.; Springer, A.; Kusche, J.

    2017-12-01

    Atmospheric and terrestrial water budgets, which represent important boundary conditions for both climate modeling and hydrological studies, are linked by evapotranspiration (E) and precipitation (P). These fields are provided by numerical weather prediction models and atmospheric reanalyses such as ERA-Interim and MERRA-Land; yet, in particular the quality of E is still not well evaluated. Via the terrestrial water budget equation, water storage changes derived from products of the Gravity Recovery and Climate Experiment (GRACE) mission, combined with runoff (R) data can be used to assess the realism of atmospheric models. In this contribution we will investigate the closure of the water balance for short-term fluxes, i.e. the agreement of GRACE water storage changes with P-E-R flux time series from different (global and regional) atmospheric reanalyses, land surface models, as well as observation-based data sets. Missing river runoff observations will be extrapolated using the calibrated rainfall-runoff model GR2M. We will perform a global analysis and will additionally focus on selected river basins in West Africa. The investigations will be carried out for various temporal scales, focusing on short-term fluxes down to daily variations to be detected in daily GRACE time series.

  14. Fixing hydro - The forgotten renewable

    International Nuclear Information System (INIS)

    Nalder, N.

    1992-01-01

    Since the dawn of civilization, man has captured the energy potential of falling water, from the water wheels in the fertile crescent of ancient times to today's highly sophisticated conventional and pumped storage projects. As we approach the 21st century, electric energy captured from falling water provides 2.0 trillion kilowatt-hours (21.23 quadrillion Btu), roughly 20% of the world's electric energy. Of the 2.56 billion kilowatts of the world's installed electric generating capacity, hydropower accounts for 24%. Between 1980 and 1989, world generation of hydroelectric power rose from 1.7 trillion kWh to 2.0 trillion kWh. As of January 1, 1988, the US has 90.5 million kW of installed hydro capacity - 70.8 million kW of it under license by the Federal Energy Regulatory Commission - with annual generation estimated at just under 300 billion kWh. Hydro's share, which not long ago comprised 13% of the nation's total capacity, now is just a 9% share. The US has the option to choose one or another path for hydro. If policy makers are willing to coast on a cushion of cheap natural gas, they will continue to shun hydro and put obstacles in its path. But if they come to regard hydro as an attractive resource - as they did only recently - economically and environmentally, they will encourage more balance in resource policies. Believing that interest in a balanced national resource portfolio will grow, the author reviews the past and suggests a possible future course of reasonable development for hydro. The article concludes with some suggested principles that will be needed if the appropriate balance is to be found

  15. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  16. An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost

    International Nuclear Information System (INIS)

    Yuan, Xiaohui; Tian, Hao; Yuan, Yanbin; Huang, Yuehua; Ikram, Rana M.

    2015-01-01

    Highlights: • Multi-objective hydro-thermal-wind scheduling model (MO-HTWS) is establish. • The extra cost in MO-HTWS problem caused by wind uncertainty is considered. • An extended NSGA-III is proposed to solve MO-HTWS problem. • Constraint handling strategies are presented to modify infeasible solutions. • The feasibility and effectiveness of the proposed method is verified by example. - Abstract: Due to the characteristics of clean and renewable, wind power is significant to economic and environmental operation of electric power system so that it attracts more and more attention from researchers. This paper integrates wind power with hydrothermal scheduling to establish multi-objective economic emission hydro-thermal-wind scheduling problem (MO-HTWS) model with considering wind uncertain cost. To solve MO-HTWS problem with various complicated constraints, this paper extends NSGA-III by introducing the dominance relationship criterion based on constraint violation to select new generation. Moreover, the constraint handling strategy which repairs the infeasible solutions by modifying the decision variables in feasible zone according to the violation amount is proposed. Finally, a daily scheduling example of hydro-thermal-wind system is used to test the ability of NSGA-III for solving MO-HTWS problem. It is concluded from the superior quality and good distribution of the Pareto optimal solutions that, NSGA-III can offer an efficient alternative for optimizing MO-HTWS problem

  17. The power of commitment : Newfoundland and Labrador Hydro 2000 annual report

    International Nuclear Information System (INIS)

    2000-01-01

    A consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) was presented with particular focus on energy production, energy sales, the Avalon Transmission upgrade, development of the Granite Canal and Hydro's dam safety program. Hydro reported a 4.5 per cent increase in gross energy production at their generating plants throughout the system. Production from hydro sources also increased by 4.5 per cent to a total of 5,032 GWh. Thermal production from the Holyrood generating facility also increased slightly to 1,040 GWh. Production for peaking and emergency requirements from gas turbines and diesel plants dropped to 0.6 GWh. In 2000, about 83 per cent of all the energy supplied to their customers came from hydro sources. Total energy sales were up 4.6 per cent during 2000. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets, liabilities and capital. tabs., figs

  18. Wind power, network congestion and hydro resource utilisation in the Norwegian power market

    International Nuclear Information System (INIS)

    Foersund, Finn; Singh, Balbir; Jensen, Trond; Larsen, Cato

    2005-01-01

    Capacity constraints in electricity networks can have important impacts on utilization of new renewable energy (RE) capacity and incumbent generation resources. Neglect of such impacts in development of RE resources can result in crowding-out of incumbent generation. This trade-off is particularly problematic if the incumbent generation also consists of renewable sources, such as hydropower in the Norwegian electricity system. This paper presents a numerical analysis of the current wind-power development plans in North Norway and their impacts on utilization of hydropower. Policy simulations in paper are conducted using a dynamic partial equilibrium model that is calibrated to reflect the structure of the Nordic power market. The paper draws conclusion and policy implications for integration of RE resources in the Norwegian power market. (Author)

  19. Large-scale Wind Power integration in a Hydro-Thermal Power Market

    OpenAIRE

    Trøtscher, Thomas

    2007-01-01

    This master thesis describes a quadratic programming model used to calculate the spot prices in an efficient multi-area power market. The model has been adapted to Northern Europe, with focus on Denmark West and the integration of large quantities of wind power. In the model, demand and supply of electricity are equated, at an hourly time resolution, to find the spot price in each area. Historical load values are used to represent demand which is assumed to be completely inelastic. Supply i...

  20. Spectral decomposition of regulatory thresholds for climate-driven fluctuations in hydro- and wind power availability

    Science.gov (United States)

    Wörman, A.; Bottacin-Busolin, A.; Zmijewski, N.; Riml, J.

    2017-08-01

    Climate-driven fluctuations in the runoff and potential energy of surface water are generally large in comparison to the capacity of hydropower regulation, particularly when hydropower is used to balance the electricity production from covarying renewable energy sources such as wind power. To define the bounds of reservoir storage capacity, we introduce a dedicated reservoir volume that aggregates the storage capacity of several reservoirs to handle runoff from specific watersheds. We show how the storage bounds can be related to a spectrum of the climate-driven modes of variability in water availability and to the covariation between water and wind availability. A regional case study of the entire hydropower system in Sweden indicates that the longest regulation period possible to consider spans from a few days of individual subwatersheds up to several years, with an average limit of a couple of months. Watershed damping of the runoff substantially increases the longest considered regulation period and capacity. The high covariance found between the potential energy of the surface water and wind energy significantly reduces the longest considered regulation period when hydropower is used to balance the fluctuating wind power.

  1. (Hydro-Quebec) Illustrated vocabulary representing power line transmission and distribution of electric power. 4, maintenance. (Hydro-Quebec) Vocabulaire illustre des lignes aeriennes de transport et de distribution d'electricite. Fascicule 4, entretien

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    This dictionary is intended to help standardize the terminology used among Hydro-Quebec personnel involved with power lines. This volume is concerned with words applicable to power line maintenance, and is arranged in six parts: poles and link sticks, adapters and related tools, safety devices, safety clothing and climbing equipment, measurement and control devices, and techniques. Virtually all of the terms are illustrated. English language equivalents are given, but these are not standardized terms and are included for informative purposes only. English and French indexes are included. 184 refs., 256 figs.

  2. Reliability-oriented energy storage sizing in wind power systems

    DEFF Research Database (Denmark)

    Qin, Zian; Liserre, Marco; Blaabjerg, Frede

    2014-01-01

    Energy storage can be used to suppress the power fluctuations in wind power systems, and thereby reduce the thermal excursion and improve the reliability. Since the cost of the energy storage in large power application is high, it is crucial to have a better understanding of the relationship...... between the size of the energy storage and the reliability benefit it can generate. Therefore, a reliability-oriented energy storage sizing approach is proposed for the wind power systems, where the power, energy, cost and the control strategy of the energy storage are all taken into account....... With the proposed approach, the computational effort is reduced and the impact of the energy storage system on the reliability of the wind power converter can be quantified....

  3. Climate Vulnerability of Hydro-power infrastructure in the Eastern African Power Pool

    Science.gov (United States)

    Sridharan, Vignesh

    2017-04-01

    At present there is around 6000 MW of installed hydropower capacity in the Eastern African power pool (EAPP)[1]. With countries aggressively planning to achieve the Sustainable development goal (SDG) of ensuring access to affordable electricity for all, a three-fold increase in hydropower capacity is expected by 2040 [1]. Most of the existing and planned infrastructure lie inside the Nile River Basin. The latest assessment report (AR 5) from the Intergovernmental Panel on Climate Change (IPCC) indicates a high level of climatic uncertainty in the Nile Basin. The Climate Moisture index (CMI) for the Eastern Nile region and the Nile Equatorial lakes varies significantly across the different General Circulation Models (GCM)[2]. Such high uncertainty casts a shadow on the plans to expand hydropower capacity, doubting whether hydropower expansion can contribute to the goal of improving access to electricity or end up as sunk investments. In this assessment, we analyze adaptation strategies for national energy systems in the Eastern African Power Pool (EAPP), which minimize the regret that could potentially arise from impacts of a changed climate. An energy systems model of the EAPP is developed representing national electricity supply infrastructure. Cross border transmission and hydropower infrastructure is defined at individual project level. The energy systems model is coupled with a water systems management model of the Nile River Basin that calculates the water availability at different hydropower infrastructures under a range of climate scenarios. The results suggest that a robust adaptation strategy consisting of investments in cross border electricity transmission infrastructure and diversifying sources of electricity supply will require additional investments of USD 4.2 billion by 2050. However, this leads to fuel and operational cost savings of up to USD 22.6 billion, depending on the climate scenario. [1] "Platts, 2016. World Electric Power Plants Database

  4. Hydro-energy

    International Nuclear Information System (INIS)

    Bacher, P.; Tardieu, B.

    2005-01-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  5. Assessing climate change impact on complementarity between solar and hydro power in areas affected by glacier shrinkage

    Science.gov (United States)

    Diah Puspitarini, Handriyanti; François, Baptiste; Zoccatelli, Davide; Brown, Casey; Creutin, Jean-Dominique; Zaramella, Mattia; Borga, Marco

    2017-04-01

    Variable Renewable Energy (VRE) sources such as wind, solar and runoff sources are variable in time and space, following their driving weather variables. In this work we aim to analyse optimal mixes of energy sources, i.e. mixes of sources which minimize the deviation between energy load and generation, for a region in the Upper Adige river basin (Eastern Italian Alps) affected by glacier shrinking. The study focuses on hydropower (run of the river - RoR) and solar energy, and analyses the current situation as well different climate change scenarios. Changes in glacier extent in response to climate warming and/or altered precipitation regimes have the potential to substantially alter the magnitude and timing, as well as the spatial variation of watershed-scale hydrologic fluxes. This may change the complementarity with solar power as well. In this study, we analyse the climate change impact on complementarity between RoR and solar using the Decision Scaling approach (Brown et al. 2012). With this approach, the system vulnerability is separated from the climatic hazard that can come from any set of past or future climate conditions. It departs from conventional top-down impact studies because it explores the sensitivity of the system response to a plausible range of climate variations rather than its sensitivity to the time-varying outcome of individual GCM projections. It mainly relies on the development of Climate Response Functions that bring together i) the sensitivity of some system success and/or failure indicators to key external drivers (i.e. mean features of regional climate) and ii) the future values of these drivers as simulated from climate simulation chains. The main VRE sources used in the study region are solar- and hydro-power (with an important fraction of run-of-the river hydropower). The considered indicator of success is the 'energy penetration' coefficient, defined as the long-run percentage of energy demand naturally met by the VRE on an hourly

  6. Battery Energy Storage Technology for power systems-An overview

    DEFF Research Database (Denmark)

    Chandrashekhara, Divya K; Østergaard, Jacob

    2009-01-01

    the present status of battery energy storage technology and methods of assessing their economic viability and impact on power system operation. Further, a discussion on the role of battery storage systems of electric hybrid vehicles in power system storage technologies had been made. Finally, the paper...... suggests a likely future outlook for the battery technologies and the electric hybrid vehicles in the context of power system applications....

  7. Pulsed power generators using an inductive energy storage system

    International Nuclear Information System (INIS)

    Akiyama, H.; Sueda, T.; Katschinski, U.; Katsuki, S.; Maeda, S.

    1996-01-01

    The pulsed power generators using an inductive energy storage system are extremely compact and lightweight in comparison with those using a capacitive energy storage system. The reliable and repetitively operated opening switch is necessary to realize the inductive pulsed power generator. Here, the pulsed power generators using the inductive energy storage system, which have been developed in Kumamoto University, are summarized. copyright 1996 American Institute of Physics

  8. The Meielsgrund and Turbach small hydro power stations in Saanen, Switzerland; PCH du Meielsgrund et PCH de Turbach - Rapports finaux

    Energy Technology Data Exchange (ETDEWEB)

    Cavin, G. [Stucky SA, Renens (Switzerland); Wagner, T. [Sigmaplan, Berne (Switzerland)

    2009-12-15

    These four final illustrated reports for the Swiss Federal Office of Energy (SFOE) deal with various aspects of two small hydro projects on two affluents of the river Saane in Switzerland. The first report presents two variants for the enhancement of the existing Meielsgrund installation as well as a new, parallel installation. The catchment area involved, available head, residual water quantities, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. The second report describes the project and discusses regional planning aspects, hydrological basics and environmental issues in connection with the renewal project, including details on invertebrates found in the stream and their relevance to fishing and nature protection issues. The third and fourth reports concern the Turbach small hydro installation. The topics discussed in these two reports are basically similar to those considered for the Meielsgrund installation.

  9. Customized electric power storage device for inclusion in a microgrid

    Science.gov (United States)

    Goldsmith, Steven Y.; Wilson, David; Robinett, III, Rush D.

    2017-08-01

    An electric power storage device included in a microgrid is described herein. The electric power storage device has at least one of a charge rate, a discharge rate, or a power retention capacity that has been customized for the microgrid. The at least one of the charge rate, the discharge rate, or the power retention capacity of the electric power storage device is computed based at least in part upon specified power source parameters in the microgrid and specified load parameters in the microgrid.

  10. People's perception on impacts of hydro-power projects in Bhagirathi river valley, India.

    Science.gov (United States)

    Negi, G C S; Punetha, Disha

    2017-04-01

    The people's perception on environmental and socio-economic impacts due to three hydro-electric projects (HEPs; commissioned and under construction) were studied in the north-west Indian Himalaya. Surveys among 140 project-affected people (PAPs) using a checklist of impacts indicate that among the negative impacts, decrease in flora/fauna, agriculture, flow of river, aesthetic beauty; and increase in water pollution, river bed quarrying for sand/stone, human settlement on river banks and social evils; and among the positive impacts, increase in standard of living, road connectivity, means of transport, public amenities, tourism and environmental awareness were related with HEPs. The PAPs tend to forget the negative impacts with the age of the HEPs after it becomes functional, and the positive impacts seem to outweigh the negative impacts. Study concludes that it is difficult to separate the compounding impacts due to HEP construction and other anthropogenic and natural factors, and in the absence of cause-and-effect analyses, it is hard to dispel the prevailing notion that HEPs are undesirable in the study area that led to agitations by the environmentalists and stopped construction of one of these HEPs. To overcome the situation, multi-disciplinary scientific studies involving the PAPs need to be carried out in planning and decision-making to make HEPs environment friendly and sustainable in this region. There is also a need to adopt low carbon electric power technologies and promote a decentralized energy strategy through joint ventures between public and private companies utilizing locally available renewable energy resources.

  11. Potency of Micro Hydro Power Plant Development Use of Kelampuak River Flow Located in Tamblang Village – Buleleng

    Directory of Open Access Journals (Sweden)

    Dewa Ngakan Ketut Putra Negara

    2012-11-01

    Full Text Available Need of electrical energy is increasing along with people population and economic growth. According to PLN data, Bali Province’s electrical consumption is predicted growth 5,6% in average every year. Until year 2007, electrical condition in Bali is categorized critical. If Power Plat in Bali, PLTG Gilimanuk that has power 130 MW is out of system, affecting Bali’s electrical back up is minus. Consecuenlly, it will be extinguishing if there is not adding power plan or new energy supply. This problem needs to be anticipated by use of thermal energy program such as coal, gas and geothermal and use of alternative energy such as solar, wind and ocean energies. Regency of Buleleng is one of Regency in Bali having potency of renewable energy development especially water resource. It has some rivers that have potency to be developed as a Micro Hydro Power Plant (PLTMH. One of them is Kelampuak River which is located in Tamblang Village. As a first step in developing of Micro Hydro Power Plant, it needs to be known water debit and head of the river. For that reason, it needs to be investigated debit and head of Kelampuak River so that it can be predicted the power can be generated.

  12. Hydro adventurers

    International Nuclear Information System (INIS)

    Wood, Janet

    2000-01-01

    Some of the changes brought about by privatisation of the hydroelectric power industry in Ecuador are discussed. At present, about 25% of the population has no electricity supply; in the remaining areas demand is increasing. Seven new facilities are presently under discussion and these are described briefly. A plant at Abitugua is to be developed as a 'merchant plant' and the meaning and implications of this are described in detail. The present financing programme for Abituaga and an alternative financing programme are detailed. By 2010, some 40% of Ecuador's electricity is expected to come from hydro

  13. 75 FR 66083 - Iron Mask Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-10-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13723-000] Iron Mask Hydro..., Iron Mask Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Iron Mask Pumped Storage Project to be...

  14. Project management for the Virginia power spent fuel storage project

    International Nuclear Information System (INIS)

    Smith, M.

    1992-01-01

    Like Duke Power, Virginia Power has been involved in spent fuel storage expansion studies for a long time - possibly a little longer than Duke Power. Virginia Power's initial studies date back to the late 70s and into the early 80s. Large variety of storage techniques are reviewed including reracking and transshipment. Virginia Power also considered construction a new spent fuel pool. This was one of the options that was considered early on since Virginia Power started this process before any dry storage techniques had been proven. Consolidation of spent fuel is something that was also studied. Finally, construction of dry storage facility was determined to be the technology of choice. They looked a large variety of dry storage technologies and eventually selected dry storage in metal casks at Surry. There are many of reasons why a utility may choose one technology over another. In Virginia Power's situation, additional storage was needed at Surry much earlier than at other utilities. Virginia Power was confronted with selecting a storage technique and having to be a leader in that it was the first U.S. utility to implement a dry storage system

  15. THERMOCHEMICAL HEAT STORAGE FOR CONCENTRATED SOLAR POWER

    Energy Technology Data Exchange (ETDEWEB)

    PROJECT STAFF

    2011-10-31

    Thermal energy storage (TES) is an integral part of a concentrated solar power (CSP) system. It enables plant operators to generate electricity beyond on sun hours and supply power to the grid to meet peak demand. Current CSP sensible heat storage systems employ molten salts as both the heat transfer fluid and the heat storage media. These systems have an upper operating temperature limit of around 400 C. Future TES systems are expected to operate at temperatures between 600 C to 1000 C for higher thermal efficiencies which should result in lower electricity cost. To meet future operating temperature and electricity cost requirements, a TES concept utilizing thermochemical cycles (TCs) based on multivalent solid oxides was proposed. The system employs a pair of reduction and oxidation (REDOX) reactions to store and release heat. In the storage step, hot air from the solar receiver is used to reduce the oxidation state of an oxide cation, e.g. Fe3+ to Fe2+. Heat energy is thus stored as chemical bonds and the oxide is charged. To discharge the stored energy, the reduced oxide is re-oxidized in air and heat is released. Air is used as both the heat transfer fluid and reactant and no storage of fluid is needed. This project investigated the engineering and economic feasibility of this proposed TES concept. The DOE storage cost and LCOE targets are $15/kWh and $0.09/kWh respectively. Sixteen pure oxide cycles were identified through thermodynamic calculations and literature information. Data showed the kinetics of re-oxidation of the various oxides to be a key barrier to implementing the proposed concept. A down selection was carried out based on operating temperature, materials costs and preliminary laboratory measurements. Cobalt oxide, manganese oxide and barium oxide were selected for developmental studies to improve their REDOX reaction kinetics. A novel approach utilizing mixed oxides to improve the REDOX kinetics of the selected oxides was proposed. It partially

  16. Optimal sizing of utility-scale photovoltaic power generation complementarily operating with hydropower: A case study of the world’s largest hydro-photovoltaic plant

    International Nuclear Information System (INIS)

    Fang, Wei; Huang, Qiang; Huang, Shengzhi; Yang, Jie; Meng, Erhao; Li, Yunyun

    2017-01-01

    Highlights: • Feasibility of complementary hydro-photovoltaic operation across the world is revealed. • Three scenarios of the novel operation mode are proposed to satisfy different load demand. • A method for optimally sizing a utility-scale photovoltaic plant is developed by maximizing the net revenue during lifetime. • The influence of complementary hydro-photovoltaic operation upon water resources allocation is investigated. - Abstract: The high variability of solar energy makes utility-scale photovoltaic power generation confront huge challenges to penetrate into power system. In this paper, the complementary hydro-photovoltaic operation is explored, aiming at improving the power quality of photovoltaic and promoting the integration of photovoltaic into the system. First, solar-rich and hydro-rich regions across the world are revealed, which are suitable for implementing the complementary hydro-photovoltaic operation. Then, three practical scenarios of the novel operation mode are proposed for better satisfying different types of load demand. Moreover, a method for optimal sizing of a photovoltaic plant integrated into a hydropower plant is developed by maximizing the net revenue during lifetime. Longyangxia complementary hydro-photovoltaic project, the current world’s largest hydro-photovoltaic power plant, is selected as a case study and its optimal photovoltaic capacities of different scenarios are calculated. Results indicate that hydropower installed capacity and annual solar curtailment rate play crucial roles in the size optimization of a photovoltaic plant and complementary hydro-photovoltaic operation exerts little adverse effect upon the water resources allocation of Longyangxia reservoir. The novel operation mode not only improves the penetration of utility-scale photovoltaic power generation but also can provide a valuable reference for the large-scale utilization of other kinds of renewable energy worldwide.

  17. Real-Time Dynamic Simulation of Korean Power Grid for Frequency Regulation Control by MW Battery Energy Storage System

    Directory of Open Access Journals (Sweden)

    Tae-Hwan Jin

    2016-12-01

    Full Text Available The aim of this study was to develop a real-time dynamic simulator of a power grid with power plant and battery model. The simulator was used to investigate the frequency control characteristics of a megawatt-scale high-capacity energy storage system connected to the electric power grid. In this study, a lithium-ion secondary battery was chosen as one of the batteries for a grid-connected model. The dynamics of the model was analysed in both steady and transient states. The frequency control system of the battery model plays a role in regulating the grid frequency by controlling the power of energy storage systems according to process variables and grid frequencies. The power grid model based on the current power network of South Korea, included power plants, substations and power demands. The power supply is classified by the type of turbine generator as thermal, nuclear, hydro power, pumped power storage, combined power plants, and batteries, including high-capacity energy storage systems rated for a maximum of 500 MW. This study deals with an installed capacity of 87.17 GW and peak load of 77.30 GW in the Korean power grid. For 24 hours of operation, the maximum and minimum power outputs were simulated as 61.59 GW and 46.32 GW, respectively. The commercialized real-time dynamic simulation software ProTRAX was used. The simulation was conducted to observe the operation characteristics of the frequency control system during a breakdown of power plants, as well as under governor-free operation, auto generation control operation, and with the battery energy storage system connected. The results show that the model is valid for each power plant breakdown simulation. They also confirm that the output power and frequency controls of the battery operated well during simulations.

  18. Solar Power Augmented Electrolysis Module for Energy Storage

    Data.gov (United States)

    National Aeronautics and Space Administration — Integrating solar photovoltaic power with regenerative fuel cell systems for energy storage can often be very complex and costly. It usually requires complex power...

  19. Inventory of future power and heat production technologies. Partial report Energy storage; Inventering av framtidens el- och vaermeproduktionstekniker. Delrapport Energilagring

    Energy Technology Data Exchange (ETDEWEB)

    Messing, Lars; Lindahl, Sture (Gothia Power AB, Goeteborg (Sweden))

    2008-12-15

    In this report a survey of different techniques for storage of electrical energy. The following alternatives are described regarding method, characteristics, potential and economy. Batteries; Capacitors; Flywheels; Pump storage hydro power plants; Hydrogen gas generation; Air compression. Regarding evaluation of methods for storage of electrical energy. Battery storage: The development of Lithium-ion batteries are of great interest. In the present situation it is however difficult of classify battery storage as a good alternation in applications with frequent re-charging cycles and re-charging of large energy volumes. The batteries have limited life length compared to other alternatives. Also the power is limited at charging and discharging. Energy storage in capacitors: 'Super-capacitors' having large power capacity is considered to be of interest in applications where fast control of power is necessary. The ongoing development of based on carbon-nanotubes will increase the energy storage capacity compared with the today existing super-capacitors. This can in the future be an alternative to battery storage. Of further interest is also the idea to combine battery and capacitor based storage to achieve longer life-time of the batteries and faster power control. Flywheel energy storage: The energy storage capacity is relatively limited but power control can be fast. This system can be an alternative to capacitor based energy storage. Pump-storage hydro power plant: This type of energy storage is well suited and proven for time frame up to some days. In the Swedish power system there is today not any large demand of energy storage in this time frame as there is a large capacity in conventional hydro power plants with storage capacity. Pump-storage can however be of interest in the southern part of Sweden. In some operation stages the grid is loaded up to its limit due to large power transmission from the north. The pump-storage can reduce this power transfer

  20. Inventory of future power and heat production technologies. Partial report Energy storage; Inventering av framtidens el- och vaermeproduktionstekniker. Delrapport Energilagring

    Energy Technology Data Exchange (ETDEWEB)

    Messing, Lars; Lindahl, Sture [Gothia Power AB, Goeteborg (Sweden)

    2008-12-15

    In this report a survey of different techniques for storage of electrical energy. The following alternatives are described regarding method, characteristics, potential and economy. Batteries; Capacitors; Flywheels; Pump storage hydro power plants; Hydrogen gas generation; Air compression. Regarding evaluation of methods for storage of electrical energy. Battery storage: The development of Lithium-ion batteries are of great interest. In the present situation it is however difficult of classify battery storage as a good alternation in applications with frequent re-charging cycles and re-charging of large energy volumes. The batteries have limited life length compared to other alternatives. Also the power is limited at charging and discharging. Energy storage in capacitors: 'Super-capacitors' having large power capacity is considered to be of interest in applications where fast control of power is necessary. The ongoing development of based on carbon-nanotubes will increase the energy storage capacity compared with the today existing super-capacitors. This can in the future be an alternative to battery storage. Of further interest is also the idea to combine battery and capacitor based storage to achieve longer life-time of the batteries and faster power control. Flywheel energy storage: The energy storage capacity is relatively limited but power control can be fast. This system can be an alternative to capacitor based energy storage. Pump-storage hydro power plant: This type of energy storage is well suited and proven for time frame up to some days. In the Swedish power system there is today not any large demand of energy storage in this time frame as there is a large capacity in conventional hydro power plants with storage capacity. Pump-storage can however be of interest in the southern part of Sweden. In some operation stages the grid is loaded up to its limit due to large power transmission from the north. The pump-storage can reduce this power transfer during

  1. Comparative Study of Electric Energy Storages and Thermal Energy Auxiliaries for Improving Wind Power Integration in the Cogeneration System

    Directory of Open Access Journals (Sweden)

    Yanjuan Yu

    2018-01-01

    Full Text Available In regards to the cogeneration system in Northern China, mainly supported by combined heat and power (CHP plants, it usually offers limited operation flexibility due to the joint production of electric and thermal power. For that large-scale wind farms included in the cogeneration system, a large amount of wind energy may have to be wasted. To solve this issue, the utilization of the electric energy storages and the thermal energy auxiliaries are recommended, including pumped hydro storage (PHS, compressed air energy storage (CAES, hydrogen-based energy storage (HES, heat storage (HS, electric boilers (EB, and heat pumps (HP. This paper proposes a general evaluation method to compare the performance of these six different approaches for promoting wind power integration. In consideration of saving coal consumption, reducing CO2 emissions, and increasing investment cost, the comprehensive benefit is defined as the evaluation index. Specifically, a wind-thermal conflicting expression (WTCE is put forward to simplify the formulation of the comprehensive benefit. Further, according to the cogeneration system of the West Inner Mongolia (WIM power grid, a test system is modelled to perform the comparison of the six different approaches. The results show that introducing the electric energy storages and the thermal energy auxiliaries can both contribute to facilitating wind power integration, and the HP can provide the best comprehensive benefit.

  2. Posibilities of electric power storage from renewable sources

    Directory of Open Access Journals (Sweden)

    Petr Bača

    2010-07-01

    Full Text Available This paper presents an overview of all currently commercially available options of energy storage in the power distributionnetwork. The paper puts forward arguments for energy storage in the distribution network as well as requirements that must be metby the relevant energy storage systems. The paper describes 7 technologies allowing the solution of energy storage problems, includingtheir basic principles and summarizing benefits and drawbacks of individual solutions.

  3. Optimal Power Flow in Microgrids with Energy Storage

    DEFF Research Database (Denmark)

    Levron, Yoash; Guerrero, Josep M.; Beck, Yuval

    2013-01-01

    Energy storage may improve power management in microgrids that include renewable energy sources. The storage devices match energy generation to consumption, facilitating a smooth and robust energy balance within the microgrid. This paper addresses the optimal control of the microgrid’s energy...... storage devices. Stored energy is controlled to balance power generation of renewable sources to optimize overall power consumption at the microgrid point of common coupling. Recent works emphasize constraints imposed by the storage device itself, such as limited capacity and internal losses. However...

  4. Intelligent Power Management of hybrid Wind/ Fuel Cell/ Energy Storage Power Generation System

    OpenAIRE

    A. Hajizadeh; F. Hassanzadeh

    2013-01-01

    This paper presents an intelligent power management strategy for hybrid wind/ fuel cell/ energy storage power generation system. The dynamic models of wind turbine, fuel cell and energy storage have been used for simulation of hybrid power system. In order to design power flow control strategy, a fuzzy logic control has been implemented to manage the power between power sources. The optimal operation of the hybrid power system is a main goal of designing power management strategy. The hybrid ...

  5. A novel off-grid hybrid power system comprised of solar photovoltaic, wind, and hydro energy sources

    International Nuclear Information System (INIS)

    Bhandari, Binayak; Lee, Kyung-Tae; Lee, Caroline Sunyong; Song, Chul-Ki; Maskey, Ramesh K.; Ahn, Sung-Hoon

    2014-01-01

    Highlights: • We propose two hybridization methods for small off-grid power systems consisting solar (PV), wind, and micro-hydro sources. • One of the methods was implemented in a mini-grid connecting Thingan and Kolkhop villages in Makawanpur District, Nepal. • The results can be applied to help achieve Millennium Development Goal 7: Ensuring environmental sustainability. • This is the first implementation anywhere comprising of three renewable energy power, in a single off-grid power system. • This research may be applied as a practical guide for implementing similar systems in various locations. - Abstract: Several factors must be considered before adopting a full-phase power generation system based on renewable energy sources. Long-term necessary data (for one year if possible) should be collected before making any decisions concerning implementation of such a systems. To accurately assess the potential of available resources, we measured solar irradiation, wind speed, and ambient temperature at two high-altitude locations in Nepal: the Lama Hotel in Rasuwa District and Thingan in Makawanpur District. Here, we propose two practical, economical hybridization methods for small off-grid systems consisting entirely of renewable energy sources—specifically solar photovoltaic (PV), wind, and micro-hydro sources. One of the methods was tested experimentally, and the results can be applied to help achieve Millennium Development Goal 7: Ensuring environmental sustainability. Hydro, wind, and solar photovoltaic energy are the top renewable energy sources in terms of globally installed capacity. However, no reports have been published about off-grid hybrid systems comprised of all three sources, making this implementation the first of its kind anywhere. This research may be applied as a practical guide for implementing similar systems in various locations. Of the four off-grid PV systems installed by the authors for village electrification in Nepal, one was

  6. Piloting a community-based micro-hydro power generation project

    International Nuclear Information System (INIS)

    Buenafe, Menandro B.; Eponio, Melchor P.

    1998-01-01

    A community based microhydro power generation project was successfully piloted in Dulao, Malibcong, Abra. The project started with the identification and evaluation of five potential creeks flowing near villages in the Cordillera hinterlands. All the sites showed comparative hydrologic features except for one factor that decided the project's implementation: the willingness of the people to invest by providing their labor- counterpart. On this account, only the residents of Dulao put their full trust in the implementing institutions, the main reason for the project's success. The micro-hydro power project consisted of an earthen diversion canal that conveyed part of the streamflow unto a forebay located above the powerhouse. The forebay was built of riprap and concrete, equipped with a desilting chamber, trashrack, a spillway, and an overflow canal that directed water to the ricefields downstream. A polyethylenevinyl penstock was laid underground along the slope,from the forebay to the powerhouse. The penstock assumed a Y-configuration inside the powerhouse where the two crossflow turbines were separately mounted on each arms. Two butterfly valves were positioned just before each turbine so that flow can be alternately controlled for the two machines. A tailrace drained the discharge from the turbines back to the same creek. Originally, the setup could only operate the 3kw turbine that ran the ricemill by means of a flat belt drive. Upon further hydrologic study, an 8kw crossflow turbine was installed to a drive a 7.5kva, two-pole, single phase alternator. The 8kw turbine can operate under three design flows, namely: 20,40, and 60 liters per second. The turbine-alternator setup was achieved by a pulley and belt drive arrangement. Typically, the AC generator was provided with monitoring instruments like a volt meter, frequency meter, and ampere meter. An electronic load controller (ELC) was observed to effectively protect the alternator from runaway speeds, over

  7. A long-term optimization method for reservoir management in a market oriented hydro-dominated power systems

    International Nuclear Information System (INIS)

    Sultovic, E.; Sarajcev, I.; Majstrovic, M.

    2001-01-01

    This paper presents an optimization-based method for the long-term scheduling of hydrothermal power system. The proposed method maximizes the profit of hydroelectric production in power system based on monthly energy requirement of the system and unit commitment calculations. The method allows precise hydro chain modeling with numerous restrictions as well as computation for multiple-reservoir river systems with multiple-purpose operation. The method has been implemented in a computer program and tested on power system, which is very similar to Croatian Power System in the year 2000. Several testing results are given. Presented method can be applicable for long-term planning in a competitive electricity market due to possibility of unit commitment calculations with different electrical energy price during scheduling horizon. (authors)

  8. Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' hydroelectric system into the power system of the Republic of Macedonia

    International Nuclear Information System (INIS)

    Rumenova, Evica; Naumoski, Kliment

    2001-01-01

    At the and of 1998, a study on conditions and possibilities of the 'Shara' hydroelectric system construction was prepared. The study considers an interesting idea for building up three reversible power plants. From electricity point of view the study emphasizes several significant issues that require comprehensive analyses in order to define the conditions and possibilities for their development. This paper attempts to give an overview of one of this issues: Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' - system into the power supply system of Republic of Macedonia. (Original)

  9. Bidding Strategy of Virtual Power Plant with Energy Storage Power Station and Photovoltaic and Wind Power

    Directory of Open Access Journals (Sweden)

    Zhongfu Tan

    2018-01-01

    Full Text Available For the virtual power plants containing energy storage power stations and photovoltaic and wind power, the output of PV and wind power is uncertain and virtual power plants must consider this uncertainty when they participate in the auction in the electricity market. In this context, this paper studies the bidding strategy of the virtual power plant with photovoltaic and wind power. Assuming that the upper and lower limits of the combined output of photovoltaic and wind power are stochastically variable, the fluctuation range of the day-ahead energy market and capacity price is stochastically variable. If the capacity of the storage station is large enough to stabilize the fluctuation of the output of the wind and photovoltaic power, virtual power plants can participate in the electricity market bidding. This paper constructs a robust optimization model of virtual power plant bidding strategy in the electricity market, which considers the cost of charge and discharge of energy storage power station and transmission congestion. The model proposed in this paper is solved by CPLEX; the example results show that the model is reasonable and the method is valid.

  10. Upstream fish migration. Report of the hydro power panel of experts; Fischaufstieg. Bericht aus der Expertengruppe Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    Roger, Sebastian [RWE Innogy GmbH, Essen (Germany). Asset Management Hydro National; Kaefer, Sabine [Verbund Hydro Power AG, Villach (Austria); Ulrich, Jochen [EDH Energiedienst Holding AG, Laufenburg (Switzerland). Oekologie und Werkdienst; Zemanek, Friedrich [evn naturkraft Erzeugungsgesellschaft m.b.H., Maria Enzersdorf (Austria)

    2013-10-01

    In recent years, ecological regulations and environmental demands have steadily increased on European, national, and on Federal State level. One key issue of Federal implementations of the European water framework directive is to achieve the environmental targets by establishing the passability for fish. In support of its member companies, VGB (TC 'Hydro Power Plants') set up a transnational expert group. This group was to analyse, compare, and evaluate different essential guidelines for fish passes and residual flows including the exchange of experience and the provision of practical examples. (orig.)

  11. Transportation and storage of foreign spent power reactor fuel

    International Nuclear Information System (INIS)

    1979-01-01

    This report describes the generic actions to be taken by the Department of Energy, in cooperation with other US government agencies, foreign governments, and international organizations, in support of the implementation of Administration policies with respect to the following international spent fuel management activities: bilateral cooperation related to expansion of foreign national storage capacities; multilateral and international cooperation related to development of multinational and international spent fuel storage regimes; fee-based transfer of foreign spent power reactor fuel to the US for storage; and emergency transfer of foreign spent power reactor fuel to the US for storage

  12. Hydro Ottawa Holding Inc. 2004 annual report : 3 ways to make 1 powerful connection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    An overview of the municipally owned Hydro Ottawa Holding Inc. was presented in this annual report. In 2004, the utility moved out of a deficit position for the first time in its 4 year history. Consolidated net earnings from continuing and discontinued operations increased to $19.7 million from $2.6 million. The increase was due mainly to decreases in operating, maintenance and administrative costs, as well as to the recovery of the cost of regulatory assets and the gain on the disposal of discontinued operations. As a result, the Corporation's deficit of $16.9 million became retained earnings of $2.8 million. Financial highlights were presented, as well as a comparison of distributors' charges with other utilities. It was noted that transparency and accountability were improved with more regular reporting to its shareholder, the City of Ottawa. In late 2004, City Council approved Hydro Ottawa Holding's 5 year consolidated financial plan which recommended that the City invest $37.8 million back into the Corporation and receive payment of the balance. The payback of the City's loan was financed through the Corporation's placement, in 2005, of $200 million in bonds. New programs included a trash-to-electricity contract, a bounty on energy-wasting fridges, and Telecom Ottawa's Data Backup and Recovery Service. Hydro Ottawa Holding Inc. is an amalgamation of 5 Ottawa-area utilities, and now provides leadership to 3 subsidiaries: Hydro Ottawa Ltd., Energy Ottawa Inc., and Telecom Ottawa Holding Inc.. Financial highlights of the 3 subsidiaries were also provided. tabs., figs.

  13. Hydro Ottawa Holding Inc. 2004 annual report : 3 ways to make 1 powerful connection

    International Nuclear Information System (INIS)

    2005-01-01

    An overview of the municipally owned Hydro Ottawa Holding Inc. was presented in this annual report. In 2004, the utility moved out of a deficit position for the first time in its 4 year history. Consolidated net earnings from continuing and discontinued operations increased to $19.7 million from $2.6 million. The increase was due mainly to decreases in operating, maintenance and administrative costs, as well as to the recovery of the cost of regulatory assets and the gain on the disposal of discontinued operations. As a result, the Corporation's deficit of $16.9 million became retained earnings of $2.8 million. Financial highlights were presented, as well as a comparison of distributors' charges with other utilities. It was noted that transparency and accountability were improved with more regular reporting to its shareholder, the City of Ottawa. In late 2004, City Council approved Hydro Ottawa Holding's 5 year consolidated financial plan which recommended that the City invest $37.8 million back into the Corporation and receive payment of the balance. The payback of the City's loan was financed through the Corporation's placement, in 2005, of $200 million in bonds. New programs included a trash-to-electricity contract, a bounty on energy-wasting fridges, and Telecom Ottawa's Data Backup and Recovery Service. Hydro Ottawa Holding Inc. is an amalgamation of 5 Ottawa-area utilities, and now provides leadership to 3 subsidiaries: Hydro Ottawa Ltd., Energy Ottawa Inc., and Telecom Ottawa Holding Inc.. Financial highlights of the 3 subsidiaries were also provided. tabs., figs

  14. The economics of energy storage in 14 deregulated power markets

    International Nuclear Information System (INIS)

    Figueiredo, F.C.; Flynn, P.C.; Cabral, E.A.

    2006-01-01

    In regulated power markets, electricity is stored to better utilize existing generation and to defer costly investment in generation. The justification is a reduction in the overall regulated price of power compared to the alternative investment in new primary generation. However, any storage of electrical power also involves a capital investment and incurs the cost of inefficiency. In deregulated energy markets, the sale of electricity or ancillary services from pumped storage can be evaluated based on each individual project. The economic basis for power storage is that power is purchased during periods of low price and resold during periods of high price. This study used historical power price data from 14 deregulated markets around the world to evaluate the economic incentive to use pumped storage for electrical energy. Each market was shown to have a unique average diurnal power price profile that results in a unique price spread for pumped storage. The diurnal price pattern and efficiency of storage was used to assess the net income potential from energy sales from pumped storage for each market. The markets were ranked in terms of the incentive to invest in pumped energy storage as well as on available revenue, and on potential return on investment. An optimal operating profile was illustrated in detail based on historical price patterns for one of the markets. The net income potential was then combined with the capital and operating cost of pumped storage. The adequacy of return on investment for pumped storage was analyzed by two different methods. The differences between markets stem from different diurnal power price patterns that reflect the generation mix, market design and participant behaviours. 17 refs., 7 tabs., 7 figs., 1 appendix

  15. Perceived risk of nuclear and hydro electrical power generation in Colombia

    International Nuclear Information System (INIS)

    Munera, H.A.

    1982-12-01

    This report deals with the estimation of risk factors of hydro plants and the perception of risks and benefits of nuclear, hydropower and coal by a selected part of the public. Historical data (1922 - 1979) on occurrence of earthquakes in Colombia demonstrate high seismicity (3,489 incidents) for the country in total and also for areas where the majority of hydro projects are to be located. Model-based calculations of regional probabilities for earthquakes at prospective dam-sites with a magnitude of 7 (Richter scale) or larger resulted in p=0.038/year for a 50 year recurrence period for high and p=0.0004/year for low seismicity areas. Attitudes towards three energy systems were elicited from 130 university students and graduates with a questionnaire based on a psychometric model. Generally attitudes were most favourable towards hydro, less favourable towards coal and more critical towards nuclear. Nuclear is perceived to have economic advantages, but to pose environmental, individual and societal risks. Respondents PRO and CON nuclear agree on the lack of risk from hydropower

  16. Optimal Sizing Of An Off-Grid Small Hydro-Photovoltaic-Diesel Generator Hybrid Power System For A Distant Village

    Directory of Open Access Journals (Sweden)

    Adebanji B.

    2017-08-01

    Full Text Available This paper presented an optimal sizing technique for an off-grid hybrid system consisting of Small Hydro SHP system Photovoltaic PV modules Battery BATT banks and Diesel Generator DG. The objective cost function Annualized Cost System and the Loss of Power Supply Probability LPSP were minimized with application of Genetic Algorithm GA in order to reduce the Cost of Energy COE generation. GA compared to other convectional optimization methods has the ability to attain global optimum easily. The decision variables are the number of small hydro turbines NSHP number of solar panels NPV number of battery banks NBATT and the capacity of DG PDG. The proposed method was applied to a typical rural village Itapaji-Ekiti in Nigeria. The monthly average solar irradiance data were converted into hourly solar irradiance data for uniformity. Sensitivity analysis was also performed to identify the most important parameter influencing the optimized hybrid system. The optimal sizing result of the HPS is 954 kW of SHP 290 kW of PV panels 9500 sets of 600Ah battery strings and 350 kW of DG. The optimal Loss of Power Supply Probability LPSP is 0.0054 and the Renewable Fraction RF is 0.62 which is indeed a significant improvement on the environment and comparatively better than any other combinations in the system.

  17. Bearing Diagnostics of Hydro Power Plants Using Wavelet Packet Transform and a Hidden Markov Model with Orbit Curves

    Directory of Open Access Journals (Sweden)

    Gabriel Pino

    2018-01-01

    Full Text Available The contribution of a medium-sized hydro power plant to the power grid can be either at base load or at peak load. When the latter is the most common operation mode, it increases the start and stop frequency, intensifying the hydro turbine components’ degradation, such as the guide bearings. This happens due to more frequent operation in transient states, which means being outside the service point of the machines’ nominal condition, consisting of speed, flow, and gross head. Such transient state operation increases the runner bearings’ mechanical vibration. The readings are acquired during the runner start-ups and filtered by a DC component mean value and a wavelet packet transform. The filtered series are used to estimate the relationship between the maximum orbit curve displacement and the accumulated operating hours. The estimated equation associated with the ISO 7919-5 vibration standards establishes the sojourn times of the degradation states, sufficient to obtain the transition probability distribution. Thereafter, a triangular probability function is used to determine the observation probability distribution in each state. Both matrices are inputs required by a hidden Markov model aiming to simulate the equipment deterioration process, given a sequence of maximum orbit curve displacements.

  18. Experimental investigation of fish downstream passage and turbine related fish mortality at an innovative hydro power setup

    International Nuclear Information System (INIS)

    Geiger, Franz; Cuchet, Mathilde; Rutschmann, Peter

    2016-01-01

    The fish downstream passage of small fish at the innovative TUM hydro shaft power plant concept was investigated experimentally. The behavior of 1974 inserted individuals of brown trout, grayling, barbel, minnow and bullhead of 45 mm to 220 mm body length was observed in a fully functional test setup which included a 35 kW Kaplan turbine and a horizontal screen with 20 mm bar clearance. The 24 h tests were conducted under nature like conditions whereas the laboratory environment also enabled targeted hydraulic situations and modifications of the bypass during the test series. A recapture rate of the fish of 99% and a subsequent 96 h observation period yielded detailed information about the migration behavior and instant as well as long term mortality. The results reveal the actual passage distribution of small fish between bypass and turbine and the turbine related injury and mortality rates in dependency of fish species, fish length, turbine discharge and bypass arrangement. General trends as well as species specific particularities could be deduced. The work confirms the suitability of the employed experimental approach and the ecological potential of the investigated hydro power plant concept. The behavioral barrier effect of the screen on small fish and the necessary of appropriate downstream migration corridor were proved and quantified. (authors)

  19. Hydro-power production and fish habitat suitability: Assessing impact and effectiveness of ecological flows at regional scale

    Science.gov (United States)

    Ceola, Serena; Pugliese, Alessio; Ventura, Matteo; Galeati, Giorgio; Montanari, Alberto; Castellarin, Attilio

    2018-06-01

    Anthropogenic activities along streams and rivers may be of major concern for fluvial ecosystems, e.g. abstraction and impoundment of surface water resources may profoundly alter natural streamflow regimes. An established approach aimed at preserving the behavior and distribution of fluvial species relies on the definition of ecological flows (e-flows) downstream of dams and diversion structures. E-flow prescriptions are usually set by basin authorities at regional scale, often without a proper assessment of their impact and effectiveness. On the contrary, we argue that e-flows should be identified on the basis of (i) regional and (ii) quantitative assessments. We focus on central Italy and evaluate the effects on habitat suitability of two near-threatened fish species (i.e. Barbel and Chub) and an existing hydro-power network when shifting from the current time-invariant e-flow policy to a tighter and seasonally-varying soon-to-be-enforced one. Our example clearly shows that: (a) quantitative regional scale assessments are viable even when streamflow observations are entirely missing at study sites; (b) aprioristic e-flows policies may impose releases that exceed natural streamflows for significantly long time intervals (weeks, or months); (c) unduly tightening e-flow policies may heavily impact regional hydro-power productivity (15% and 42% losses on annual and seasonal basis, respectively), yet resulting in either marginal or negligible improvements of fluvial ecosystem.

  20. Novel Control Strategy for Multiple Run-of-the-River Hydro Power Plants to Provide Grid Ancillary Services

    Energy Technology Data Exchange (ETDEWEB)

    Mohanpurkar, Manish; Luo, Yusheng; Hovsapian, Rob; Muljadi, Eduard; Gevorgian, Vahan; Koritarov, Vladimir

    2017-05-01

    Electricity generated by Hydropower Plants (HPPs) contributes a considerable portion of bulk electricity generation and delivers it with a low carbon footprint. In fact, HPP electricity generation provides the largest share from renewable energy resources, which includes solar and wind energy. The increasing penetration of wind and solar penetration leads to a lowered inertia in the grid and hence poses stability challenges. In recent years, breakthrough in energy storage technologies have demonstrated the economic and technical feasibility of extensive deployments in power grids. Multiple ROR HPPs if integrated with scalable, multi time-step energy storage so that the total output can be controlled. Although, the size of a single energy storage is far smaller than that of a typical reservoir, cohesively managing multiple sets of energy storage distributed in different locations is proposed. The ratings of storages and multiple ROR HPPs approximately equals the rating of a large, conventional HPP. The challenges associated with the system architecture and operation are described. Energy storage technologies such as supercapacitors, flywheels, batteries etc. can function as a dispatchable synthetic reservoir with a scalable size of energy storage will be integrated. Supercapacitors, flywheels, and battery are chosen to provide fast, medium, and slow responses to support grid requirements. Various dynamic and transient power grid conditions are simulated and performances of integrated ROR HPPs with energy storage is provided. The end goal of this research is to investigate the inertial equivalence of a large, conventional HPP with a unique set of multiple ROR HPPs and optimally rated energy storage systems.

  1. Energy storage systems: power grid and energy market use cases

    Directory of Open Access Journals (Sweden)

    Komarnicki Przemysław

    2016-09-01

    Full Text Available Current power grid and market development, characterized by large growth of distributed energy sources in recent years, especially in Europa, are according energy storage systems an increasingly larger field of implementation. Existing storage technologies, e.g. pumped-storage power plants, have to be upgraded and extended by new but not yet commercially viable technologies (e.g. batteries or adiabatic compressed air energy storage that meet expected demands. Optimal sizing of storage systems and technically and economically optimal operating strategies are the major challenges to the integration of such systems in the future smart grid. This paper surveys firstly the literature on the latest niche applications. Then, potential new use case and operating scenarios for energy storage systems in smart grids, which have been field tested, are presented and discussed and subsequently assessed technically and economically.

  2. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2006-01-01

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We use a method based on nonlinear programming (NLP), namely quadratic programming, to consider hydroelectric power generation a function of water discharge and of the head. The method has been applied successfully to solve a test case based on a realistic cascaded hydro system with a negligible computational time requirement and is also applied to show that the role played by reservoirs in the hydro chain do not depend only on their relative position. As a new contribution to earlier studies, which presented reservoir operation rules mainly for medium and long-term planning procedures, we show that the physical data defining hydro chain parameters used in the nonlinear model have an effect on the STHS, implying different optimal storage trajectories for the reservoirs accordingly not only with their position in the hydro chain but also with the new parameterisation defining the data for the hydro system. Moreover, considering head dependency in the hydroelectric power generation, usually neglected for hydro plants with a large storage capacity, provides a better short-term management of the conversion of the potential energy available in the reservoirs into electric energy, which represents a major advantage for the hydroelectric utilities in a competitive electricity market. (author)

  3. Non-linear multi-objective model for planning water-energy modes of Novosibirsk Hydro Power Plant

    Science.gov (United States)

    Alsova, O. K.; Artamonova, A. V.

    2018-05-01

    This paper presents a non-linear multi-objective model for planning and optimizing of water-energy modes for the Novosibirsk Hydro Power Plant (HPP) operation. There is a very important problem of developing a strategy to improve the scheme of water-power modes and ensure the effective operation of hydropower plants. It is necessary to determine the methods and criteria for the optimal distribution of water resources, to develop a set of models and to apply them to the software implementation of a DSS (decision-support system) for managing Novosibirsk HPP modes. One of the possible versions of the model is presented and investigated in this paper. Experimental study of the model has been carried out with 2017 data and the task of ten-day period planning from April to July (only 12 ten-day periods) was solved.

  4. Application of energy storage devices in power systems

    African Journals Online (AJOL)

    user

    paper concentrates on performance benefits of adding energy storage to power ..... Because of geographical, environmental, and cost constraints, construction of pumped .... transport, in Information Day on Non-Nuclear Energy RTD, Brussels.

  5. Workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. Part I

    International Nuclear Information System (INIS)

    1997-01-01

    The publication has been set up as proceedings of the workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. The proceedings consist of the following chapters: (1) BOT schemes as financial model of hydro power projects; (2) Application of pumped storage plants in the control of the Slovak power system and the possibility of pumped storage plant Ipel exploitation towards the year 2010; (3) Use of hydro energetic potential of streams from the aspects of nature conservation on the example of north Slovakia; (4) Ecological aspects of the hydro power industry and possible means to improve ecological conditions of water reservoirs; (5) Preparation and realization of HPP Zilina; (6) Freudenau HPP. ecological measures and groundwater management; (7) Present state of hydro power development in Austria

  6. Large-scale electricity storage utilizing reversible solid oxide cells combined with underground storage of CO2 and CH4

    DEFF Research Database (Denmark)

    Jensen, Søren Højgaard; Graves, Christopher R.; Mogensen, Mogens Bjerg

    2015-01-01

    Electricity storage is needed on an unprecedented scale to sustain the ongoing transition of electricity generation from fossil fuels to intermittent renewable energy sources like wind and solar power. Today pumped hydro is the only commercially viable large-scale electricity storage technology......-scale electricity storage with a round-trip efficiency exceeding 70% and an estimated storage cost around 3 b kW-1 h-1, i.e., comparable to pumped hydro and much better than previously proposed technologies...

  7. Power and dignity: the social consequences of hydro-electric development for the James Bay Cree

    Energy Technology Data Exchange (ETDEWEB)

    Niezen, R [Harvard Univ., Boston, MA (United States)

    1993-11-01

    The social impact that large-scale hydro-electric development has on the Cree of James Bay following the construction of the La Grande Complex was discussed. Many environmental changes were brought about by dam construction. The project, which also involved the first settlement (the James Bay and Northern Quebec Agreement) directed at extinguishing aboriginal title to land and natural resources in Canada, resulted in several relocations of Cree communities. In addition to compensation, the Agreement included a formal procedure for environmental and social impact assessment for development projects. However, there was little commitment, as a matter of corporate or government policy, to monitoring any of the social impacts. This paper is a preliminary response to an appeal for attention to be focused on the social consequences of hydro-electric development for the Cree in James Bay. Data from social service files indicate that the rapid centralization of the James Bay Cree into structured communities led to social instability in the villages, reflected by high frequencies in suicide, neglect of children, vandalism and drug and alcohol abuse. The material presented here is expected to serve as a warning that in further developing the far North of Quebec the pace of social change in Cree society will have to be slowed down to avoid social destruction of the native communities. 15 refs., 2 tabs.

  8. Power and dignity: the social consequences of hydro-electric development for the James Bay Cree

    International Nuclear Information System (INIS)

    Niezen, R.

    1993-01-01

    The social impact that large-scale hydro-electric development has on the Cree of James Bay following the construction of the La Grande Complex was discussed. Many environmental changes were brought about by dam construction. The project, which also involved the first settlement (the James Bay and Northern Quebec Agreement) directed at extinguishing aboriginal title to land and natural resources in Canada, resulted in several relocations of Cree communities. In addition to compensation, the Agreement included a formal procedure for environmental and social impact assessment for development projects. However, there was little commitment, as a matter of corporate or government policy, to monitoring any of the social impacts. This paper is a preliminary response to an appeal for attention to be focused on the social consequences of hydro-electric development for the Cree in James Bay. Data from social service files indicate that the rapid centralization of the James Bay Cree into structured communities led to social instability in the villages, reflected by high frequencies in suicide, neglect of children, vandalism and drug and alcohol abuse. The material presented here is expected to serve as a warning that in further developing the far North of Quebec the pace of social change in Cree society will have to be slowed down to avoid social destruction of the native communities. 15 refs., 2 tabs

  9. Power and pay: The union and equal pay at B.C. Electric/Hydro

    International Nuclear Information System (INIS)

    Creese, G.

    1993-01-01

    The struggle for equal pay for women in one large office union, the Office and Technical Employees' Union (OTEU), at British Columbia Electric/Hydro is analyzed. The analysis concentrates on the second phase of the equal pay movement that preoccupied the union for over 30 years starting in 1949. Equal pay for equal job-evaluation was finally achieved in 1981, yet this struggle did not produce a subsequent questioning of gender bias within the job evaluation process or the structure of the existing hierarchy of jobs. The study illustrates some of the ways that gender hierarchies and inequities are defined and reinforced by employers seeking to maintain profits by keeping labor costs down, as BC Electric/Hydro resisted eliminating the differential in male and female pay, systematically restructured unequal pay, and continually resorted to lower community standards even when the company's own job evaluation system suggested equal comparators with male jobs. Gendered jobs are also shaped by union practices, as evidenced by the OTEU's role in restructuring the postwar gender division of labor in the late 1940s, as well as their early and persistent challenges to the female differential but, at the same time, the continued marginalization of equal pay as a women's issue rather than a general union issue. 66 refs

  10. Power and pay: The union and equal pay at B. C. Electric/Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Creese, G

    The struggle for equal pay for women in one large office union, the Office and Technical Employees' Union (OTEU), at British Columbia Electric/Hydro is analyzed. The analysis concentrates on the second phase of the equal pay movement that preoccupied the union for over 30 years starting in 1949. Equal pay for equal job-evaluation was finally achieved in 1981, yet this struggle did not produce a subsequent questioning of gender bias within the job evaluation process or the structure of the existing hierarchy of jobs. The study illustrates some of the ways that gender hierarchies and inequities are defined and reinforced by employers seeking to maintain profits by keeping labor costs down, as BC Electric/Hydro resisted eliminating the differential in male and female pay, systematically restructured unequal pay, and continually resorted to lower community standards even when the company's own job evaluation system suggested equal comparators with male jobs. Gendered jobs are also shaped by union practices, as evidenced by the OTEU's role in restructuring the postwar gender division of labor in the late 1940s, as well as their early and persistent challenges to the female differential but, at the same time, the continued marginalization of equal pay as a women's issue rather than a general union issue. 66 refs.

  11. Power system stabilising features from wind power plants augmented with energy storage

    DEFF Research Database (Denmark)

    Tarnowski, Germán C.; Kjær, Philip C; Lærke, Rasmus

    2014-01-01

    This paper describes a wind power plant augmented with energy storage, configured to provide ancillary services (primary reserve, inertial response, power oscillation damping) for enhancement of power system stability. Energy storage can complement wind power plants thus reducing the need for any...... overload or curtailment to allow active power modulation. A 12MW + 1.6MW augmented plant is used for demonstration of representative performance of the particular ancillary service control algorithms...

  12. Wind Power Development and Energy Storage under China’s Electricity Market Reform—A Case Study of Fujian Province

    Directory of Open Access Journals (Sweden)

    Dunguo Mou

    2018-01-01

    Full Text Available This paper, based on the Fujian provincial 500 kV grid and part of the 220 kV grid and the key power plants, including hydro, coal, nuclear, gas, wind and pumping and storage hydro powers (PSHP connected to the grid, constructs an independent electricity market model. Using data that are very close to reality about coal fired power production costs, along with data about power plants’ technical constraints, this paper studies the effect of wind power on Fujian’s provincial electricity market. Firstly, the paper analyzes the relationship between wind speed and wind power output and the effects of short-term power output fluctuation on frequency modulation and voltage regulation. Secondly, under supposition of the production costs following quadratic functions, the paper analyzes the effects of changes in wind power output on the electricity supply costs under optimal power flow. Thirdly, using the bidding model in the Australian Electricity Market Operator for reference and supposing that, in a competitive market, coal fired power plants can bid 6 price bands according to their capacity, the paper analyzes effects of wind power on electricity prices under optimal power flow, the stabilizing effects of PSHP and the minimum PSHP capacity needed to stabilize the electricity market. Finally, using a daily load curve, this paper simulates the electricity prices’ fluctuation under optimal power flow and PSHP’s stabilizing effect. The results show that, although PSHP has a large external social welfare effect, it can hardly make a profit. In the end, this paper puts forward some policy suggestions for Fujian province’s wind and nuclear power development, PSHP construction and electricity market development.

  13. Coupled Hydro-Mechanical Simulations of CO2 Storage Supported by Pressure Management Demonstrate Synergy Benefits from Simultaneous Formation Fluid Extraction

    Directory of Open Access Journals (Sweden)

    Kempka Thomas

    2015-04-01

    Full Text Available We assessed the synergetic benefits of simultaneous formation fluid extraction during CO2 injection for reservoir pressure management by coupled hydro-mechanical simulations at the prospective Vedsted storage site located in northern Denmark. Effectiveness of reservoir pressure management was investigated by simulation of CO2 storage without any fluid extraction as well as with 66% and 100% equivalent volume formation fluid extraction from four wells positioned for geothermal heat recovery. Simulation results demonstrate that a total pressure reduction of up to about 1.1 MPa can be achieved at the injection well. Furthermore, the areal pressure perturbation in the storage reservoir can be significantly decreased compared to the simulation scenario without any formation fluid extraction. Following a stress regime analysis, two stress regimes were considered in the coupled hydro-mechanical simulations indicating that the maximum ground surface uplift is about 0.24 m in the absence of any reservoir pressure management. However, a ground uplift mitigation of up to 37.3% (from 0.24 m to 0.15 m can be achieved at the injection well by 100% equivalent volume formation fluid extraction. Well-based adaptation of fluid extraction rates can support achieving zero displacements at the proposed formation fluid extraction wells located close to urban infrastructure. Since shear and tensile failure do not occur under both stress regimes for all investigated scenarios, it is concluded that a safe operation of CO2 injection with simultaneous formation fluid extraction for geothermal heat recovery can be implemented at the Vedsted site.

  14. Hydrologic design methodologies for small-scale hydro at ungauged sites. Phase 2A, British Columbia. Summary report. Integrated method for power analysis (IMP)

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Analysis of the feasibility of sites for small-scale hydroelectric power generation in British Columbia can be a difficult process in cases where gauged streamflow data are not available. This report outlines the capabilities of a package of computer programs, designed to aid the planner of small-scale hydro projects in evaluating the hydrology and energy potential of ungauged sites in that province. The programs were developed by using appropriate programming and hydrological research that had already been done, and taking advantage of experience already available from previous use of components of the package. As the province's mountainous terrain, with numerous microclimates, precluded use of methods of regional analysis based on regression or comparison with gauged streams, the package was developed on the basis of a conceptual model of physical processes on the land and in the atmosphere. The resulting package, the Integrated Method for Power Analysis, consists of five basic components: an atmospheric model of annual precipitation and one-in-ten-year 24-h maximum rainfall; a watershed model that will generate streamflow data based on information from the atmospheric model; a flood frequency analysis system that uses site-specific topographic information and information from the atmospheric model to generate a flood frequency curve; a hydroelectric power simulation program which determines the daily energy output for a run-of-river or reservoir storage site; and a graphics analysis package that provides direct visualization of atmospheric and streamflow data, and the results of watershed and power simulation modelling. 2 figs., 1 tab.

  15. Forced-air, vacuum, and hydro precooling of cauliflower (Brassica oleracea L. var. botrytis cv. Freemont: Part II. Determination of quality parameters during storage

    Directory of Open Access Journals (Sweden)

    Ilknur Alibas

    2015-03-01

    Full Text Available Cauliflower heads, which were precooled using four different methods including vacuum, forced-air, and high and low flow hydro precooling, were stored under controlled atmosphere and room conditions. Controlled atmosphere conditions (CA were as follows: 1°C temperature, 90 ± 5% relative humidity, and 0:21 [(%CO2:%O2 – (0:21 control] atmosphere composition. Room conditions (RC were: 22±1°C temperature and 55-60% humidity. Various quality parameters of the cauliflower heads were assessed during storage (days 0, 7, 14, 21, 28, and 35 under controlled atmosphere and room conditions (days 0, 5, and 10. During storage, weight loss, deterioration rate, overall sensory quality score, hardness, and colour (L, a, b, C and α were evaluated. In the present study, the strength and quality parameters of cauliflower under CA and RC conditions were obtained. Vacuum precooling was found to be most suitable method before cauliflower was submitted to cold storage and sent to market. Furthermore, the storage of cauliflower without precooling resulted in a significant decrease in quality parameters.

  16. Coordinated control of wind power and energy storage

    DEFF Research Database (Denmark)

    Zhao, Haoran

    the coordinated control of wind power and ESS. Due to the different technical characteristics, such as power and energy density, ESS can play different roles either in generation-side, grid-side or demand side. This thesis focuses on the following two scenarios:• Scenario 1: As a part of wind farm, the ESS plays......Nowadays, wind power has become one of the fastest growing sources of electricity in the world. Due to the inherent variability and uncertainty, wind power integration into the grid brings challenges for power systems, particularly when the wind power penetration level is high. The challenges exist...... in many aspects, such as reliability, power quality and stability. With the rapid development of energy storage technology, the application of Energy Storage System (ESS) is considered as an effective solution to handle the aforementioned challenges. The main objective of this study is to investigate...

  17. A Risk Analysis of Small-Hydro Power (SHP Plants Investments

    Directory of Open Access Journals (Sweden)

    Jorge Cunha

    2014-06-01

    Full Text Available The increase in electricity consumption has led to a sharp increase in energy demand which rose environmental and sustainability concerns. To address this issue, there has been an incentive to resource to renewable energy sources for electricity production. Departing from a real case study, the investment appraisal of a SHP project under the present market conditions is described, followed by a sensitivity analysis in order to identify the main sources of risk. The main results obtained showed that in the context of a regulated tariff the project is worthwhile due to a positive NPV. However, if electricity had to be sold at market prices, the project becomes unprofitable. Theresults put also in evidence the vulnerability of the investment to an adverse change in interest rates. Future SHP plant investments should take into account the need to operate in a free market and to compete with technologies based on fossil fuels or large hydro.

  18. Hydro under shock

    International Nuclear Information System (INIS)

    Maffezzini, I.; Pineault, E.; Poirier, M.

    1997-01-01

    A discussion of the potential privatisation of Hydro-Quebec, and of the motivation to do so, was presented. The creation of Hydro-Quebec resulted from the nationalization in 1963 of all major electricity producers in the province of Quebec. Since its inception, Hydro-Quebec has gone through many episodes of restructuring but none more far reaching in extent, or in consequences, than the present one. The current deregulation of the electrical industry in Quebec, and the potential commercialization of Hydro-Quebec is considered to be a natural and inevitable result of the current global trend towards competition in the power industry and the demand for greater consumer choice. 1 tab

  19. Electricity is the real target - nuclear energy the scapegoat. Comparison between nuclear energy and hydro power voting behaviour

    International Nuclear Information System (INIS)

    Aegerter, Irene

    1993-01-01

    As nuclear community sometimes feel desperate because the nuclear energy is a very special subject triggering so much controversy among women and young persons especially it has been found that the battle against nuclear energy is just a pretext. Comparing the campaign on a referendum against hydropower - voted in Switzerland in may 1992 it was found astonishingly that exactly the same arguments were applied as during the campaign for the phase out of nuclear energy in 1990. The results were presented at PIME 1991. Voting behaviour for nuclear energy and hydro power are comparable: the gender gap (32% acceptance by men versus 48% by women) found in the 1992 vote about stopping hydropower plants in Switzerland was bigger than the one found in the 1990 vote about nuclear energy. A detailed analysis of these data is presented

  20. Hot Thermal Storage in a Variable Power, Renewable Energy System

    Science.gov (United States)

    2014-06-01

    where cost effective, increase the utilization of distributed electric power generation through wind, solar, geothermal , and biomass renewable...characteristics and may not necessarily be available in all cases. Types of direct heat energy systems include solar thermal, waste heat, and geothermal ...of super capacitor energy storage system in microgrid,” in International Conference on Sustainable Power Generation and Supply, Janjing, China

  1. Combined solar photovoltaic and hydroelectric pumped storage power plant

    International Nuclear Information System (INIS)

    Gzraryan, R.V.

    2009-01-01

    Combined model of solar photovoltaic and pumped storage stations aimed at power supply for 40 rural houses are considered. The electric circuits of station and their acting regularities are developed and submitted. The both generation curve of photovoltaic station and load curve of electrical customer are considered. The power of hydraulic unit, pumping unit and photovoltaic station are calculated

  2. Thermal energy storage for CSP (Concentrating Solar Power

    Directory of Open Access Journals (Sweden)

    Py Xavier

    2017-01-01

    Full Text Available The major advantage of concentrating solar power before photovoltaic is the possibility to store thermal energy at large scale allowing dispatchability. Then, only CSP solar power plants including thermal storage can be operated 24 h/day using exclusively the solar resource. Nevertheless, due to a too low availability in mined nitrate salts, the actual mature technology of the two tanks molten salts cannot be applied to achieve the expected international share in the power production for 2050. Then alternative storage materials are under studies such as natural rocks and recycled ceramics made from industrial wastes. The present paper is a review of those alternative approaches.

  3. Thermal energy storage for CSP (Concentrating Solar Power)

    Science.gov (United States)

    Py, Xavier; Sadiki, Najim; Olives, Régis; Goetz, Vincent; Falcoz, Quentin

    2017-07-01

    The major advantage of concentrating solar power before photovoltaic is the possibility to store thermal energy at large scale allowing dispatchability. Then, only CSP solar power plants including thermal storage can be operated 24 h/day using exclusively the solar resource. Nevertheless, due to a too low availability in mined nitrate salts, the actual mature technology of the two tanks molten salts cannot be applied to achieve the expected international share in the power production for 2050. Then alternative storage materials are under studies such as natural rocks and recycled ceramics made from industrial wastes. The present paper is a review of those alternative approaches.

  4. Market power and storage in electricity markets

    International Nuclear Information System (INIS)

    Skaar, Jostein

    2004-05-01

    Market power in liberalised electricity markets dominated by hydropower is analyzed in four chapters. The existing literature on competition in hydropower markets is briefly presented and examined. Chapter 1 discusses the effects of market power in the context of acquisitions in a situation where transmission capacity is constrained. Chapter 2 and 3 elaborate on the issue of competition and market power when water inflow is uncertain, and finally Chapter 4 focuses on the supply function equilibrium model in the context of a hydropower market

  5. Feasibility study for power generation using off- grid energy system from micro hydro-PV-diesel generator-battery for rural area of Ethiopia: The case of Melkey Hera village, Western Ethiopia

    Directory of Open Access Journals (Sweden)

    Tilahun Nigussie

    2017-07-01

    Full Text Available Electricity supply in Ethiopia is extremely antiquated. Most of the remote rural areas of Ethiopia are not yet electrified. Electrifying these remote areas by extending grid system is difficult and costly. Melkey Hera village is one of a rural community situated in western Ethiopia. In this village, extension of the grid is not yet practical. As the current international trend in rural electrification is to utilize renewable energy resources; solar, wind, biomass, and micro hydro power systems can be seen as alternatives. Therefore, the target of this paper is to investigate the viability of a micro hydro, Photo Voltaic (PV and Diesel Generator-battery hybrid power system options to come up with the best techno-economic and optimum configuration for supplying electricity to this village. The study was performed by an assessment of the predicted village energy demand, the available renewable energy resources, and then using the software called HOMER. The best hybrid system type was described and the optimization of the system configuration was also done. Furthermore, through the simulation of different configuration of the supply system, the optimal mini-grid hybrid system design was established to combine hydro, solar PV, battery energy storage and diesel generator. This system demonstrated to be more reliable in operation, and the most cost-effective for the required level of service. The role of energy storage in system operation also demonstrated to offer additional operational advantages in-terms of reliability and cost savings. Overall, the design results show that the majority of energy obtained from hydropower, which accounts 79%, the PV module covers 20%, and diesel generator is only 1% of the total load consumption. The obtained hybrid system is cost competitive with $\\$$0.133/kWh, which is somewhat good to satisfy the community needs. However, this is more than current energy price in Ethiopia which $\\$$0.06/kWh. If due-merit given

  6. Effect of the heating rate on residual thermo-hydro-mechanical properties of a high-strength concrete in the context of nuclear waste storage

    International Nuclear Information System (INIS)

    Galle, C.; Pin, M.; Ranc, G.; Rodrigues, S.

    2003-01-01

    Concrete is likely to be used in massive structures for nuclear waste long-term storage facilities in France. In the framework of vitrified waste and spent fuel management, these structures could be submitted to high temperatures. In standard conditions, ambient temperature should not exceed 60 degC but in case of failure of a cooling system, concretes could be temporarily exposed to temperatures up to 250 degC. Depending on the temperature rise kinetics, concretes could be damaged to a greater or lesser extent. In this context, an experimental study on the effect of heating rate on concrete thermo-hydro-mechanical properties exposed to high temperatures (110 - 250 degC) was carried out at the French Atomic Energy Commission (CEA). Data analysis and interpretation provided enough arguments to conclude that, at local scale, the impact of heating rate on residual properties was real though relatively limited. (author)

  7. Preliminary study for a drinking-water hydro-power station in Raron, Switzerland; Vorstudie Trinkwasserkraftwerk 'Moos', Gemeinde Raron VS

    Energy Technology Data Exchange (ETDEWEB)

    Loretan, F. [Schneider - Bregy und Partner AG, Raron, (Switzerland); Hiller, B. [Ryser Ingenieure AG, Berne (Switzerland)

    2006-07-01

    This final report for the Small Hydro Programme of the Swiss Federal Office of Energy (SFOE) presents the concept for the augmentation of an existing drinking-water-powered small hydro-electric project with an additional installation that is to use the overflow-water of a reservoir to drive a 75 kW Pelton turbine. The paper discusses the hydraulic situation and describes the installations proposed. Energy production and the costs involved are listed and commented on. Water in drinking-water quality from the Loetschberg railway tunnel is also to be used in the system.

  8. Dynamic modeling, simulation and control design of an advanced micro-hydro power plant for distributed generation applications

    Energy Technology Data Exchange (ETDEWEB)

    Marquez, J.L. [Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Molina, M.G. [CONICET, Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Pacas, J.M. [Institut fuer Leistungselektronik und Elektrische Antriebe, Universitaet Siegen, Fachbereich 12 Hoelderlinstr 3, D 57068 Siegen (Germany)

    2010-06-15

    A small-scale hydropower station is usually a run-of-river plant that uses a fixed speed drive with mechanical regulation of the turbine water flow rate for controlling the active power generation. This design enables to reach high efficiency over a wide range of water flows but using a complex operating mechanism, which is in consequence expensive and tend to be more affordable for large systems. This paper proposes an advanced structure of a micro-hydro power plant (MHPP) based on a smaller, lighter, more robust and more efficient higher-speed turbine. The suggested design is much simpler and eliminates all mechanical adjustments through a novel electronic power conditioning system for connection to the electric grid. In this way, it allows obtaining higher reliability and lower cost of the power plant. A full detailed model of the MHPP is derived and a new three-level control scheme is designed. The dynamic performance of the proposed MHPP is validated through digital simulations and employing a small-scale experimental set-up. (author)

  9. Pumped storage power plants in Denmark. Pumpekraftvaerker i Danmark

    Energy Technology Data Exchange (ETDEWEB)

    1988-12-15

    In 1988 there are about 250 pumped storage power plants throughout the world, yet it is difficult to obtain data about them. They are usually situated in mountainous areas so that great differences in height can be obtained between the upper and lower water storage facilities. These plants consist of the power system (turbines, pumps, generators, motors, etc.) natural or artificial water storage facilities, and water routes, (in and outgoing constructions, pressure pipes, etc.). In Denmark, reversible pumping turbines are preferred, and here specific Danish products are examined (62.5MW and a 125 MW). Possible designs for water storage basins are analyzed in detail, also with regard to their comparative economic advantages. It has been considered reasonable to site this kind of power plant in Danish coastal regions, this would be the first case where the sea has been used for the lower water storage basin. Possible sites in Jutland and on the island of Als have been investigated. In a basin for a 250 MW pumped storage power plant with optimal production throughout 8 hours, a siting 60 m above sea level could cover power production for an area of about 100 hectars. Material for a dam surrounding the lower water storage system could be produced when digging out the basin. The dam should be about 20m higher than the surrounding terrain and the volume would be about 3,2 mio. m/sup 3/. The filled basin would contain 14.0 mio. m/sup 3/ water. The velocity and volume of outgoing water masses would be very considerable and would exact safety precautions to protect ships and bathers. A tentative cost benefit analysis is presented which indicates that the possible establishment of this type of power plant in Denmark could be of considerable interest. (AB). 15 refs.

  10. A new power supply for superconductive magnetic energy storage system

    International Nuclear Information System (INIS)

    Karady, G.G.; Han, B.M.

    1992-01-01

    In this paper a new power supply for a superconductive magnetic energy storage system, which permits a fast independent regulation of the active and reactive power, is presented. The power supply is built with several units connected in parallel. Each unit consists of a 24-pulse bridge converter, thyristor-switched tap-changing transformer, and thyristor-switched capacitor bank. Its system operation is analyzed by computer simulation and a feasible system realization is shown. A superconductive magnetic energy storage system with the proposed power supply has the capability of leveling the load variation, damping the low-frequency oscillation, and improving the transient stability in the power system. This power supply can be built with commercially available components using well-proven technologies

  11. FEL radiation power available in electron storage rings

    International Nuclear Information System (INIS)

    Miyahara, Yoshikazu

    1994-01-01

    FEL radiation power available in electron storage rings was studied in the small signal regime in considering the increase of the energy spread of the electron beam caused by the FEL interaction and the decrease of the FEL gain with the increase of the energy spread in addition to the radiation damping and the quantum excitation. All these effects were considered separately, and combined with FEL power equations. The radiation power available was expressed explicitly with the parameters of the storage ring, the wiggler and the mirrors. The transient process of FEL lasing is simulated with the power equations. A rough estimation is made of the radiation power available by the FEL at different beam energies, and optimization of FEL parameters for a higher radiation power is discussed. ((orig.))

  12. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  13. High to ultra-high power electrical energy storage.

    Science.gov (United States)

    Sherrill, Stefanie A; Banerjee, Parag; Rubloff, Gary W; Lee, Sang Bok

    2011-12-14

    High power electrical energy storage systems are becoming critical devices for advanced energy storage technology. This is true in part due to their high rate capabilities and moderate energy densities which allow them to capture power efficiently from evanescent, renewable energy sources. High power systems include both electrochemical capacitors and electrostatic capacitors. These devices have fast charging and discharging rates, supplying energy within seconds or less. Recent research has focused on increasing power and energy density of the devices using advanced materials and novel architectural design. An increase in understanding of structure-property relationships in nanomaterials and interfaces and the ability to control nanostructures precisely has led to an immense improvement in the performance characteristics of these devices. In this review, we discuss the recent advances for both electrochemical and electrostatic capacitors as high power electrical energy storage systems, and propose directions and challenges for the future. We asses the opportunities in nanostructure-based high power electrical energy storage devices and include electrochemical and electrostatic capacitors for their potential to open the door to a new regime of power energy.

  14. Hydropower generation and storage, transmission constraints and market power

    International Nuclear Information System (INIS)

    Johnsen, T.A.

    2001-01-01

    We study hydropower generation and storage in the presence of uncertainty about future inflows, market power and limited transmission capacity to neighboring regions. Within our simple two-period model, market power leads to too little storage. The monopolist finds it profitable to produce more than the competitive amount in the first period and thereby stores little water in the first of two periods in order to become import constrained in the second period. In addition, little storage reduces the probability of becoming export constrained in the second period, even if the second period exhibits large inflow. Empirical findings for an area in the western part of Norway with only hydropower and high ownership concentration at the supply side, fit well to our theoretical model. We apply a numerical model to examine various policies to reduce the inefficiencies created by the local monopoly. Transmission investments have two effects. First, the export possibilities in the first period increase. More export leads to lower storage in the first period. Second, larger import capacity reduces the market power problem in the second period. The two opposite effects of transmission investments in a case with market power may be unique to hydropower systems. Introducing financial transmission rights enhance the market power of the monopolist in our model. Price caps in both or in the second period only, reduce the strategic value of water storage. (Author)

  15. Electric cars as mobile power storage systems

    International Nuclear Information System (INIS)

    Herzog, B.

    2010-01-01

    This article discusses the use of electric cars as a means of optimising the use of renewable energy sources. Charging the cars' batteries during periods when cheap electricity prices prevail and then using excess capacity to supply the mains with electricity during periods of peak demand is discussed. The possible use of wind for power generation is discussed and a system proposed by a leading supplier of electrical apparatus and systems is examined. Two examples of electric cars and associated power chains are looked at and tests in everyday practice are described

  16. Solar Powered Heat Storage for Injera Baking

    OpenAIRE

    Tesfay, Asfafaw H; Kahsay, Mulu Bayray; Nydal, Ole Jørgen

    2014-01-01

    Ethiopia with a population of about 85 million meets 96% of its energy needs with bio-mass, charcoal, wood, animal dung and plant residues. More than 50% of this energy goes entirely on baking Injera. Injera the national food of the country demands 180-220 °C to be well cooked. In this article; Injera baking with solar energy on off-focus system, status of electric powered stove and the potential for solar powered stoves is discussed. The research and development of solar thermal for househol...

  17. Review of Energy Storage System for Wind Power Integration Support

    DEFF Research Database (Denmark)

    Zhao, Haoran; Wu, Qiuwei; Hu, Shuju

    2015-01-01

    -discharging characteristics, Energy Storage System (ESS) is considered as an effective tool to enhance the flexibility and controllability not only of a specific wind farm, but also of the entire grid. This paper reviews the state of the art of the ESS technologies for wind power integration support from different aspects......With the rapid growth of wind energy development and increasing wind power penetration level, it will be a big challenge to operate the power system with high wind power penetration securely and reliably due to the inherent variability and uncertainty of wind power. With the flexible charging...

  18. The Role of Energy Storages in Energy Independent Croatia

    DEFF Research Database (Denmark)

    Krajačić, Goran; Mathiesen, Brian Vad; Duić, Neven

    2009-01-01

    electricity, heat and transport demands, and including renewable energy, power plants, and combined heat and power production (CHP) for district heating. Using the 2007 energy system the wind power share is increased by two energy storage options: Pumped Hydro and Heat Pumps in combination with Heat Storages....... The results show that such options can enable an increased penetration of wind power. Using pumped hydro storage (PHS) may increase wind power penetration from 0.5 TWh, for existing PHS installations and up to 6 TWh for very large installations. Using large heat pumps and heat storages in combination...... with specific regulation of power system could additionally increase wind penetration for 0.37 TWh. Hence, with the current technologies installed in the Croatian energy system the installed pumped hydro- plant may facilitate more than 10% wind power in the electricity system. In future research more precise...

  19. Fuel handling and storage systems in nuclear power plants

    International Nuclear Information System (INIS)

    1984-01-01

    The scope of this Guide includes the design of handling and storage facilities for fuel assemblies from the receipt of fuel into the nuclear power plant until the fuel departs from that plant. The unirradiated fuel considered in this Guide is assumed not to exhibit any significant level of radiation so that it can be handled without shielding or cooling. This Guide also gives limited consideration to the handling and storage of certain core components. While the general design and safety principles are discussed in Section 2 of this Guide, more specific design requirements for the handling and storage of fuel are given in detailed sections which follow the general design and safety principles. Further useful information is to be found in the IAEA Technical Reports Series No. 189 ''Storage, Handling and Movement of Fuel and Related Components at Nuclear Power Plants'' and No. 198 ''Guide to the Safe Handling of Radioactive Wastes at Nuclear Power Plants''. However, the scope of the Guide does not include consideration of the following: (1) The various reactor physics questions associated with fuel and absorber loading and unloading into the core; (2) The design aspects of preparation of the reactor for fuel loading (such as the removal of the pressure vessel head for a light water reactor) and restoration after loading; (3) The design of shipping casks; (4) Fuel storage of a long-term nature exceeding the design lifetime of the nuclear power plant; (5) Unirradiated fuel containing plutonium

  20. The Economics of Storage, Transmission and Drought: Integrating Variable Wind Power into Spatially Separated Electricity Grids

    NARCIS (Netherlands)

    Scora, H.; Sopinka, A.; Kooten, van G.C.

    2012-01-01

    To mitigate the high variability of wind and make it a more viable renewable energy source, observers recommend greater integration of spatially-separated electrical grids, with high transmission lines linking load centers, scattered wind farms and hydro storage sites. In this study, we examine the

  1. Hydro-energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Bacher, P. [Electricite de France (EDF), 75 - Paris (France); Tardieu, B. [Coyne et Bellier, 92 - Gennevilliers (France)

    2005-07-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  2. Expanding exports, increasing smog : Ontario Power Generation's and Hydro One's strategies to continue coal-fired electricity generation in Ontario

    International Nuclear Information System (INIS)

    Gibbons, J.

    2002-06-01

    The production of coal-fired electricity increased by approximately 150 per cent in Ontario between 1995 and 2000. As a result, the smog-causing emissions generated by the five coal-fired power plants operated by Ontario Power Generation caused an increase in smog and worsened air quality in the province as well as affecting air quality as far afield as the Atlantic provinces. Between 2002 and 2005, it is expected that the Pickering and Bruce nuclear plants will be returned to service, making the electricity generated by the coal plants surplus to Ontario's needs. Increasing this surplus are the planned natural gas generating stations. Ontario Power Generation is planning on using this surplus to export it to the United States rather than phasing out its reliance on coal. The increase in exports to the United States Northeast and Midwest is planned with Hydro One, already busy increasing its transmission capacity to the United States by 1,000 megawatt (MW). This plan involves laying 975 MW submarine cable from the Nanticoke Generating Station (operated by Ontario Power Generation) under Lake Erie to Pennsylvania, Ohio, or both states. At the moment, the exports are constrained by the government emissions limits imposed by the Ontario government on sulphur dioxide and nitrogen oxides. This constraint could be removed if Ontario Power Generation decides to pay further for pollution controls for sulphur dioxide and nitrogen oxides at its coal stations. Unfortunately, increasing the exports would also result in emissions increases for 28 other uncapped pollutants such as lead, mercury and arsenic. The author recommended that the Ontario government ban non-emergency coal-fired electricity exports to improve air quality in the province. refs., 8 figs

  3. Adaptive control of energy storage systems for power smoothing applications

    DEFF Research Database (Denmark)

    Meng, Lexuan; Dragicevic, Tomislav; Guerrero, Josep M.

    2017-01-01

    Energy storage systems (ESSs) are desired and widely applied for power smoothing especially in systems with renewable generation and pulsed loads. High-pass-filter (HPF) is commonly applied in those applications in which the HPF extracts the high frequency fluctuating power and uses...... that as the power reference for ESS. The cut-off frequency, as the critical parameter, actually decides the power/energy compensated by ESS. Practically the state-of-charge (SoC) of the ESS has to be limited for safety and life-cycle considerations. In this paper an adaptive cut-off frequency design is proposed...

  4. Utilization and storage problems in wind power plants

    Energy Technology Data Exchange (ETDEWEB)

    Molly, J P

    1977-01-01

    The energy yield of a power plant consisting of wind energy converter and storer is considerably influenced by the choice of specific characteristic values of both components. Boundary conditions of the optimization process are site, consumer behavior and a minimum demand of supply safety. If the costs of the power plant components are known, then one may determine the cheapest wind power plant taking account of the boundary conditions. The preconditions and way of calculation for optimum rotary number, the best specific rotor disk power and the necessary storage capacity for a certain supply safety are given.

  5. Monitoring for vertical creep in concrete in two silos at Wivenhoe pumped storage hydro power station

    Energy Technology Data Exchange (ETDEWEB)

    Harris, M W [Queensland Univ. of Technology, Brisbane (Australia). School of Surveying

    1997-12-31

    The need for structural monitoring is generated by expected or unexpected (newly discovered in the life of the structure) behaviour. Due to the long vertical driveshafts involved at Wivenhoe the phenomenon of `concrete creep` which, if it is occurring, could contribute to shaft misalignment and unscheduled bearing wear or failure, was used as a motivation to establish a vertical monitoring system. The particular system developed for this site is traceable, replaceable, expandable and inexpensive. Measurements are obtained by precise levelling and the use of specially calibrated vertically suspended tapes. The analysis of the vertical loops is performed using constrained variance estimation and `robust` inter-epoch comparison. (orig.)

  6. Monitoring for vertical creep in concrete in two silos at Wivenhoe pumped storage hydro power station

    Energy Technology Data Exchange (ETDEWEB)

    Harris, M.W. [Queensland Univ. of Technology, Brisbane (Australia). School of Surveying

    1996-12-31

    The need for structural monitoring is generated by expected or unexpected (newly discovered in the life of the structure) behaviour. Due to the long vertical driveshafts involved at Wivenhoe the phenomenon of `concrete creep` which, if it is occurring, could contribute to shaft misalignment and unscheduled bearing wear or failure, was used as a motivation to establish a vertical monitoring system. The particular system developed for this site is traceable, replaceable, expandable and inexpensive. Measurements are obtained by precise levelling and the use of specially calibrated vertically suspended tapes. The analysis of the vertical loops is performed using constrained variance estimation and `robust` inter-epoch comparison. (orig.)

  7. Dry spent fuel storage facility at Kozloduy Nuclear Power Plant

    International Nuclear Information System (INIS)

    Goehring, R.; Stoev, M.; Davis, N.; Thomas, E.

    2004-01-01

    The Dry Spent Fuel Storage Facility (DSF) is financed by the Kozloduy International Decommissioning Support Fund (KIDSF) which is managed by European Bank for Reconstruction and Development (EBRD). On behalf of the Employer, the Kozloduy Nuclear Power Plant, a Project Management Unit (KPMU) under lead of British Nuclear Group is managing the contract with a Joint Venture Consortium under lead of RWE NUKEM mbH. The scope of the contract includes design, manufacturing and construction, testing and commissioning of the new storage facility for 2800 VVER-440 spent fuel assemblies at the KNPP site (turn-key contract). The storage technology will be cask storage of CONSTOR type, a steel-concrete-steel container. The licensing process complies with the national Bulgarian regulations and international rules. (authors)

  8. Leveraging storage assets to meet winter power demand

    Energy Technology Data Exchange (ETDEWEB)

    Charleson, D. [Enbridge Gas Distribution, Toronto, ON (Canada)

    2004-07-01

    Toronto-based Enbridge Gas Distribution serves 1.7 million customers by distributing 420 billion cubic feet (BCF) of natural gas over more than 31,000 km of pipelines. A map of the franchise area was presented. The utility has one of the lowest operating and maintenance costs in North America. Daily gas requirements were outlined along with the historic role of storage in gas utilities. Storage is used by heat sensitive local distribution companies, marketers, large industrials, and power generators. Storage locations in North America were reviewed with reference to baseload electricity production versus peak load; depleted reservoirs; salt caverns; aquifers; and liquefied natural gas (LNG). Enbridge operates 98 BCF of storage facilities for a maximum deliverability of 1.7 BCF per day. tabs., figs.

  9. Leveraging storage assets to meet winter power demand

    International Nuclear Information System (INIS)

    Charleson, D.

    2004-01-01

    Toronto-based Enbridge Gas Distribution serves 1.7 million customers by distributing 420 billion cubic feet (BCF) of natural gas over more than 31,000 km of pipelines. A map of the franchise area was presented. The utility has one of the lowest operating and maintenance costs in North America. Daily gas requirements were outlined along with the historic role of storage in gas utilities. Storage is used by heat sensitive local distribution companies, marketers, large industrials, and power generators. Storage locations in North America were reviewed with reference to baseload electricity production versus peak load; depleted reservoirs; salt caverns; aquifers; and liquefied natural gas (LNG). Enbridge operates 98 BCF of storage facilities for a maximum deliverability of 1.7 BCF per day. tabs., figs

  10. Thermal energy storage for the Stirling engine powered automobile

    Science.gov (United States)

    Morgan, D. T. (Editor)

    1979-01-01

    A thermal energy storage (TES) system developed for use with the Stirling engine as an automotive power system has gravimetric and volumetric storage densities which are competitive with electric battery storage systems, meets all operational requirements for a practical vehicle, and can be packaged in compact sized automobiles with minimum impact on passenger and freight volume. The TES/Stirling system is the only storage approach for direct use of combustion heat from fuel sources not suitable for direct transport and use on the vehicle. The particular concept described is also useful for a dual mode TES/liquid fuel system in which the TES (recharged from an external energy source) is used for short duration trips (approximately 10 miles or less) and liquid fuel carried on board the vehicle used for long duration trips. The dual mode approach offers the potential of 50 percent savings in the consumption of premium liquid fuels for automotive propulsion in the United States.

  11. Power generation by high head water in a building using micro hydro turbine-a greener approach.

    Science.gov (United States)

    M M S R S, Bhargav; V, Ratna Kishore; S P, Anbuudayasankar; K, Balaji

    2016-05-01

    Demand for green energy production is arising all over the world. A lot of emphasis is laid in making the buildings green. Even a small amount of energy savings made contribute to saving the environment. In this study, an idea is proposed and studied to extract power from the high head water in the pipelines of a building. A building of height 15 m is considered for this study. Water flowing in the pipe has sufficient energy to run a micro hydro turbine. The feasibility of producing electrical energy from the energy of pipe water is found. The motivation is to find the feasibility of generating power using a low-cost turbine. The experimental setup consists of micro turbine of 135 mm diameter coupled to a 12-V DC generator; LEDs and resistors are employed to validate the results. The theoretical calculations were presented using the fundamental equations of fluid mechanics. The theoretical results are validated using experimental and numerical results using CFD simulation. In addition, exergy analysis has been carried out to quantify the irreversibilities during the process in the system.

  12. Optimisation of Storage for Concentrated Solar Power Plants

    Directory of Open Access Journals (Sweden)

    Luigi Cirocco

    2014-12-01

    Full Text Available The proliferation of non-scheduled generation from renewable electrical energy sources such concentrated solar power (CSP presents a need for enabling scheduled generation by incorporating energy storage; either via directly coupled Thermal Energy Storage (TES or Electrical Storage Systems (ESS distributed within the electrical network or grid. The challenges for 100% renewable energy generation are: to minimise capitalisation cost and to maximise energy dispatch capacity. The aims of this review article are twofold: to review storage technologies and to survey the most appropriate optimisation techniques to determine optimal operation and size of storage of a system to operate in the Australian National Energy Market (NEM. Storage technologies are reviewed to establish indicative characterisations of energy density, conversion efficiency, charge/discharge rates and costings. A partitioning of optimisation techniques based on methods most appropriate for various time scales is performed: from “whole of year”, seasonal, monthly, weekly and daily averaging to those best suited matching the NEM bid timing of five minute dispatch bidding, averaged on the half hour as the trading settlement spot price. Finally, a selection of the most promising research directions and methods to determine the optimal operation and sizing of storage for renewables in the grid is presented.

  13. Storage of spent fuel from power reactors. 2003 conference proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-10-01

    An International Conference on Storage of Spent Fuel from Power Reactors was organized by the IAEA in co-operation with the OECD Nuclear Energy Agency. The conference gave an opportunity to exchange information on the state of the art and prospects of spent fuel storage, to discuss the worldwide situation and the major factors influencing the national policies in this field and to identify the most important directions that national efforts and international co-operation in this area should take. The conference confirmed that the primary spent fuel management solution for the next decades will be interim storage. While the next step can be reprocessing or disposal, all spent fuel or high level waste from reprocessing must sooner or later be disposed of. The duration of interim storage is now expected to be much longer than earlier projections (up to 100 years and beyond). The storage facilities will have to be designed for these longer storage times and also for receiving spent fuel from advanced fuel cycle practices (i.e. high burnup and MOX spent fuel). It was noted that the handling and storage of spent fuel is a mature technology and meets the stringent safety requirements applicable in the different countries. The changes in nuclear policy and philosophy across the world, and practical considerations, have made storage a real necessity in the nuclear power industry. Utilities, vendors and regulators alike are addressing this adequately. The IAEA wishes to express appreciation to all chairs and co-chairs as well as all authors for their presentations to the conference and papers included in these proceedings.

  14. Storage of spent fuel from power reactors. 2003 conference proceedings

    International Nuclear Information System (INIS)

    2003-01-01

    An International Conference on Storage of Spent Fuel from Power Reactors was organized by the IAEA in co-operation with the OECD Nuclear Energy Agency. The conference gave an opportunity to exchange information on the state of the art and prospects of spent fuel storage, to discuss the worldwide situation and the major factors influencing the national policies in this field and to identify the most important directions that national efforts and international co-operation in this area should take. The conference confirmed that the primary spent fuel management solution for the next decades will be interim storage. While the next step can be reprocessing or disposal, all spent fuel or high level waste from reprocessing must sooner or later be disposed of. The duration of interim storage is now expected to be much longer than earlier projections (up to 100 years and beyond). The storage facilities will have to be designed for these longer storage times and also for receiving spent fuel from advanced fuel cycle practices (i.e. high burnup and MOX spent fuel). It was noted that the handling and storage of spent fuel is a mature technology and meets the stringent safety requirements applicable in the different countries. The changes in nuclear policy and philosophy across the world, and practical considerations, have made storage a real necessity in the nuclear power industry. Utilities, vendors and regulators alike are addressing this adequately. The IAEA wishes to express appreciation to all chairs and co-chairs as well as all authors for their presentations to the conference and papers included in these proceedings

  15. Hybrid power system (hydro, solar and wind) for rural electricity generation

    International Nuclear Information System (INIS)

    Mahinda Kurukulasuriya

    2000-01-01

    Generation of affordable cheap electric energy for rural development by a hybrid power system (10-50 kW) of hydropower, solar and wind energies on self determining basis and computer application to determine its performance. In this paper the following topics were discussed, design of hybrid power system, its justification and economic analysis, manufacturing and installation of the system. (Author)

  16. Pumped Storage Power plants, Challenges and opportunities - Some conclusions

    International Nuclear Information System (INIS)

    Viollet, Pierre-Louis; Roult, Didier; Mathex, Bruno; Ouaabi, Aziz; Louis, Frederic; Petitjean, Alain; Capuozzo, Vincent; Mazzouji, Farid; Prestat, Bruno; Nekrassov, Andrei; Caignaert, Guy; Vidil, Roland; Guilbaud, Claude; Metais, Olivier

    2011-11-01

    This document briefly synthesizes a conference which addressed the development of pumped storage power plants in the world, and social, economic, technical and scientific challenges related to this development which is closely related to the development of intermittent renewable energies (wind and solar energy). Current developments in different countries (Germany, Portugal, Switzerland, Norway, France and China) are evoked

  17. The Himalayan hydro machine and space transmission power systems - An Asian dream of 21st century

    Science.gov (United States)

    Admoddie, M.

    The advantages and disadvantages for the development of hydroelectric power are assessed for the Himalayan Rectangle, an area rising 1500 km north of a baseline between Karachi and Mandalay. This area has the potential for possessing one of the world's greatest power production capabilities. Among the disadvantages cited are the political instability and religious fundamentalism of the area, the bankrupt governments, environmental degradation, and inefficient power and irrigation systems. The advantages include the millions of talented and enterprising people in the region awaiting higher opportunities who are eager to improve their families' living standards and the large untapped hydropower resources. The concepts for hydropower development are discussed and go beyond the technologies of power and water. They include catchment ecodevelopment strategies with massive afforestation plans, setting up plans to strengthen village-level institutions to manage local natural biomass and water assets, the conversion of this regional hydropower potential into a subcontinental power system, and the exporting of power and the development of an interregional and international power grid by 2030, when both oil and local ecosystems would be dangerously depleted.

  18. Power and reactive power simultaneous control by 0.5 MJ superconducting magnet energy storage

    International Nuclear Information System (INIS)

    Ise, Toshifumi; Tsuji, Kiichiro; Murakami, Yoshishige

    1984-01-01

    Superconducting magnet energy storage (SMES) is expected to be widely applied to the pulsed sources for fusion reactor research and to the energy storage substituting for pumping-up power stations, because of its fast energy storing and discharging and very high efficiency. Some results have been obtained so far. In this paper, however, the simultaneous control of power and reactive power is considered for an energy storage composed of two sets of thyristorized power conversion system and superconducting magnets in series connection, and a direct digital control system is described on the principle, design and configuration including the compensator, and on the experiment using the 0.5 MJ superconducting magnet energy storage installed in the Superconduction Engineering Experiment Center, Osaka University. The results obtained are as follows: (1) P control priority mode and Q control priority mode (in which power and reactive power control has priority, respectively) were proposed as the countermeasures when the simultaneous control of power and reactive power became impossible; (2) the design method was established, by which power and reactive power control loops can independently be designed as a result of simulation; (3) the achievement of the simultaneous control of power and reactive power was confirmed by using P-control priority mode and Q-control priority mode, in the experiment using the control system designed by simulation. The validity of simulation model was also confirmed by actual response waveforms. (Wakatsuki, Y.)

  19. An overview of renewable energy in Spain. The small hydro-power case

    International Nuclear Information System (INIS)

    Montes, G.M.; Lopez, M. del Mar Serrano; Gamez, M. del Carmen Rubio; Ondina, A.M.

    2005-01-01

    Development of hydroelectric energy, a renewable source of power, is guaranteed and maintained by the Plan of Promotion of the Renewable Energies 1999-2010 (PLAFER). This is arrived at by means of a definition and establishment of a series of power objectives in which an increase in the hydroelectric sector in anticipated. This study corresponds to a revision of the present situation of the mini-hydraulic energy, it is expected of evolution, and development in Spain. (author)

  20. An overview of renewable energy in Spain. The small hydro-power case

    Energy Technology Data Exchange (ETDEWEB)

    Montes, G.M. [Universidad de Granada (Spain). Departamento de Ingenieria Civil; Lopez, M. del Mar Serrano [Institute for the Diversification and Saving of the Energy, Madrid (Spain). Hydroelectric Department; Gamez, M. del Carmen Rubio; Ondina, A.M. [Universidad de Granada (Spain). Departamento de Ingenieria Civil, Ingenieria de la Construccion

    2005-10-01

    Development of hydroelectric energy, a renewable source of power, is guaranteed and maintained by the Plan of Promotion of the Renewable Energies 1999-2010 (PLAFER). This is arrived at by means of a definition and establishment of a series of power objectives in which an increase in the hydroelectric sector in anticipated. This study corresponds to a revision of the present situation of the mini-hydraulic energy, it is expected of evolution, and development in Spain. (author)

  1. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  2. Experimental Evaluation of Performance of Constant Power Prime-Mover Driven Isolated 3-φ SEIG for Pico-Hydro Power Generation System in Remote Mountainous Region of Himalayas

    Directory of Open Access Journals (Sweden)

    Rathore Umesh C.

    2016-01-01

    Full Text Available This paper presents the experimental evaluation of the performance of 3-φ self-excited induction generator (SEIG suitable for pico-hydro power generation system feeding domestic load in remote mountainous region. The use of induction generators is most suitable for renewable energy conversion systems due to their enormous advantages over conventional synchronous generators. Important features of induction generators include the simplicity in construction, ruggedness, simplified control, ease in maintenance and small size per generated kW. The performance characteristics of 3-φ SEIG feeding isolated load are evaluated using MATLAB-Simulink model based on the prevalent renewable energy sources inputs and loading conditions in mountainous terrain of Himalayas. The results are validated using an experimental set-up comprising of 3-φ, 3 HP induction motor run as 3- φ induction generator driven by 5HP, 4-pole DC shunt motor acting as prime-mover.

  3. Energy Storage Applications in Power Systems with Renewable Energy Generation

    Science.gov (United States)

    Ghofrani, Mahmoud

    In this dissertation, we propose new operational and planning methodologies for power systems with renewable energy sources. A probabilistic optimal power flow (POPF) is developed to model wind power variations and evaluate the power system operation with intermittent renewable energy generation. The methodology is used to calculate the operating and ramping reserves that are required to compensate for power system uncertainties. Distributed wind generation is introduced as an operational scheme to take advantage of the spatial diversity of renewable energy resources and reduce wind power fluctuations using low or uncorrelated wind farms. The POPF is demonstrated using the IEEE 24-bus system where the proposed operational scheme reduces the operating and ramping reserve requirements and operation and congestion cost of the system as compared to operational practices available in the literature. A stochastic operational-planning framework is also proposed to adequately size, optimally place and schedule storage units within power systems with high wind penetrations. The method is used for different applications of energy storage systems for renewable energy integration. These applications include market-based opportunities such as renewable energy time-shift, renewable capacity firming, and transmission and distribution upgrade deferral in the form of revenue or reduced cost and storage-related societal benefits such as integration of more renewables, reduced emissions and improved utilization of grid assets. A power-pool model which incorporates the one-sided auction market into POPF is developed. The model considers storage units as market participants submitting hourly price bids in the form of marginal costs. This provides an accurate market-clearing process as compared to the 'price-taker' analysis available in the literature where the effects of large-scale storage units on the market-clearing prices are neglected. Different case studies are provided to

  4. Review of power quality applications of energy storage systems

    Energy Technology Data Exchange (ETDEWEB)

    Swaminathan, S.; Sen, R.K. [Sentech, Inc., Bethesda, MD (United States)

    1997-05-01

    Under the sponsorship of the US Department of Energy (DOE) Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories contracted Sentech, Inc., to assess the impact of power quality problems on the electricity supply system. This report contains the results of several studies that have identified the cost of power quality events for electricity users and providers. The large annual cost of poor power quality represents a national inefficiency and is reflected in the cost of goods sold, reducing US competitiveness. The Energy Storage Systems (ESS) Program takes the position that mitigation merits the attention of not only the DOE but affected industries as well as businesses capable of assisting in developing solutions to these problems. This study represents the preliminary stages of an overall strategy by the ESS Program to understand the magnitude of these problems so as to begin the process of engaging industry partners in developing solutions.

  5. Optimal Operation of Energy Storage in Power Transmission and Distribution

    Science.gov (United States)

    Akhavan Hejazi, Seyed Hossein

    In this thesis, we investigate optimal operation of energy storage units in power transmission and distribution grids. At transmission level, we investigate the problem where an investor-owned independently-operated energy storage system seeks to offer energy and ancillary services in the day-ahead and real-time markets. We specifically consider the case where a significant portion of the power generated in the grid is from renewable energy resources and there exists significant uncertainty in system operation. In this regard, we formulate a stochastic programming framework to choose optimal energy and reserve bids for the storage units that takes into account the fluctuating nature of the market prices due to the randomness in the renewable power generation availability. At distribution level, we develop a comprehensive data set to model various stochastic factors on power distribution networks, with focus on networks that have high penetration of electric vehicle charging load and distributed renewable generation. Furthermore, we develop a data-driven stochastic model for energy storage operation at distribution level, where the distribution of nodal voltage and line power flow are modelled as stochastic functions of the energy storage unit's charge and discharge schedules. In particular, we develop new closed-form stochastic models for such key operational parameters in the system. Our approach is analytical and allows formulating tractable optimization problems. Yet, it does not involve any restricting assumption on the distribution of random parameters, hence, it results in accurate modeling of uncertainties. By considering the specific characteristics of random variables, such as their statistical dependencies and often irregularly-shaped probability distributions, we propose a non-parametric chance-constrained optimization approach to operate and plan energy storage units in power distribution girds. In the proposed stochastic optimization, we consider

  6. Ecological aspects of the hydro power industry and possible means to improve ecological conditions of water reservoirs

    International Nuclear Information System (INIS)

    Chaika, A.

    1997-01-01

    In this report the analyse a hydro power generating structure as a multitask water management scheme and its environmental impact of water users was viewed. It is possible to improve sanitary, biological and hydraulic condition of reservoirs and limit water overgrowing by implementing the following set of measures: 1) limitation of poorly purified and non-organic discharges in these reservoirs by implementing purification structures; 2) construction of accumulation reservoirs for sewage water planted with plants-biological accumulators with consequent periodic removal of these plants; use of purificated water for irrigation; 3) limitation of biogens coming with agricultural drainage water; 4) annual removal of water plants in shallow places of reservoirs; 5) removal of silt (cleaning of the bottom) where technically possible; 6) aeration of reservoirs or their parts, especially shallow areas, including recreation areas; 7) controlled development of flora and fauna of reservoirs and neighbouring territories; it has been discovered that plant-eating fish has useful impact as biological purificatiors; 8) processing of seston (weighted plankton and remains of organisms) and water plants to get different producers (forage additions for animals, albumin-vitamin additions, chlorophyll and carotene paste, pharmaceutical materials and forage yeast). Development of silt removal technology is a very sharp problem especially for particular areas of Kiev reservoir contaminated with radioactive waste

  7. Application of multi-model control with fuzzy switching to a micro hydro-electrical power plant

    Energy Technology Data Exchange (ETDEWEB)

    Salhi, Issam; Doubabi, Said [Laboratory of Electric Systems and Telecommunications (LEST), Faculty of Sciences and Technologies of Marrakesh, Cadi Ayyad University, BP 549, Av Abdelkarim Elkhattabi, Gueliz, Marrakesh (Morocco); Essounbouli, Najib; Hamzaoui, Abdelaziz [CReSTIC, Reims University, 9, rue de Quebec B.P. 396, F-10026 Troyes cedex (France)

    2010-09-15

    Modelling hydraulic turbine generating systems is not an easy task because they are non-linear and uncertain where the operating points are time varying. One way to overcome this problem is to use Takagi-Sugeno (TS) models, which offer the possibility to apply some tools from linear control theory, whereas those models are composed of linear models connected by a fuzzy activation function. This paper presents an approach to model and control a micro hydro power plant considered as a non-linear system using TS fuzzy systems. A TS fuzzy system with local models is used to obtain a global model of the studied plant. Then, to combine efficiency and simplicity of design, PI controllers are synthesised for each considered operating point to be used as conclusion of an electrical load TS Fuzzy controller. The latter ensures the global stability and desired performance despite the change of operating point. The proposed approach (model and controller) is tested on a laboratory prototype, where the obtained results show their efficiency and their capability to ensure good performance despite the non-linear nature of the plant. (author)

  8. Phase change energy storage for solar dynamic power systems

    Science.gov (United States)

    Chiaramonte, F. P.; Taylor, J. D.

    1992-01-01

    This paper presents the results of a transient computer simulation that was developed to study phase change energy storage techniques for Space Station Freedom (SSF) solar dynamic (SD) power systems. Such SD systems may be used in future growth SSF configurations. Two solar dynamic options are considered in this paper: Brayton and Rankine. Model elements consist of a single node receiver and concentrator, and takes into account overall heat engine efficiency and power distribution characteristics. The simulation not only computes the energy stored in the receiver phase change material (PCM), but also the amount of the PCM required for various combinations of load demands and power system mission constraints. For a solar dynamic power system in low earth orbit, the amount of stored PCM energy is calculated by balancing the solar energy input and the energy consumed by the loads corrected by an overall system efficiency. The model assumes an average 75 kW SD power system load profile which is connected to user loads via dedicated power distribution channels. The model then calculates the stored energy in the receiver and subsequently estimates the quantity of PCM necessary to meet peaking and contingency requirements. The model can also be used to conduct trade studies on the performance of SD power systems using different storage materials.

  9. Small steps for hydro

    International Nuclear Information System (INIS)

    Wicke, Peter

    1998-01-01

    The government in Peru has decided to utilise its gas reserves and restrict hydro to relatively small schemes. A number of reasons for the decision are given. In 1997, the Shell-Mobile-Bechtel-COSAPI consortium was formed and agreements were signed regarding exploiting Gas de Camisea. The country's energy needs to 2010 are being assessed. It is likely that by 2001 the whole of south Peru will be receiving gas from Camisea. The Peru situation is discussed under the headings of (i) existing capacity, (ii) growing demands, (iii) a history of hydro in Peru, (iv) electrification and SHP and (v) outlook. The future for Peru's electric energy development is bright. While most of its new power capacity will come from natural gas, the small hydros also have a part to play. A stronger commitment of national and regional political authorities to consider supplies outside the big cities is said to be needed. (UK)

  10. 76 FR 7840 - American Hydro Power Company; Notice of Termination of Exemption by Implied Surrender and...

    Science.gov (United States)

    2011-02-11

    ... Power Company; Notice of Termination of Exemption by Implied Surrender and Soliciting Comments, Protests... the Commission: a. Type of Proceeding: Termination of exemption by implied surrender. b. Project No... if any term or condition of the exemption is violated. The project has not operated since 2004, and...

  11. Hydro power potentials of water distribution networks in public universities: A case study

    Directory of Open Access Journals (Sweden)

    Olufemi Adebola KOYA

    2017-06-01

    Full Text Available Public Universities in Southwestern Nigeria are densely populated student-resident campuses, so that provision of regular potable water and electricity are important, but power supply is not optimally available for all the necessary activities. This study assesses the hydropower potential of the water distribution networks in the Universities, with the view to augmenting the inadequate power supplies. The institutions with water distribution configuration capable of accommodating in-pipe turbine are identified; the hydropower parameters, such as the flow characteristics and the pipe geometry are determined to estimate the water power. Global positioning device is used in estimating the elevations of the distribution reservoirs and the nodal points. The hydropower potential of each location is computed incorporating Lucid® Lift-based spherical turbine in the pipeline. From the analysis, the lean and the peak water power are between 1.92 – 3.30 kW and 3.95 – 7.24 kW, respectively, for reservoir-fed distribution networks; while, a minimum of 0.72 kW is got for pipelines associated with borehole-fed overhead tanks. Possible applications of electricity generation from the water distribution networks of the public universities are recommended.

  12. Energy Storage in Power System Operation: The Power Nodes Modeling Framework

    DEFF Research Database (Denmark)

    Heussen, Kai; Koch, Stephan; Ulbig, Andreas

    2010-01-01

    for designing operation strategies for power systems based on ubiquitous energy storage, for example to buer non-dispatchable generation, as well as for the evaluation of the operational performance in terms of energy eciency, reliability and cost. After introducing the modeling approach and a categorization......In this paper, a novel concept for the description of energy storage in power systems with dispatchable and non-dispatchable generators and loads is presented. It is based on a system-perspective consideration of energy storage, generation and consumption. This means that grid-relevant aspects...

  13. Method for analysing the adequacy of electric power systems with wind power plants and energy storages

    Directory of Open Access Journals (Sweden)

    Perzhabinsky Sergey

    2017-01-01

    Full Text Available Currently, renewable energy sources and energy storage devices are actively introduced into electric power systems. We developed method to analyze the adequacy of these electric power systems. The method takes into account the uncertainty of electricity generation by wind power plants and the processes of energy storage. The method is based on the Monte Carlo method and allowed to use of long-term meteorological data in open access. The performed experimental research of electrical power system is constructed on the basis of the real technical and meteorological data. The method allows to estimate of effectiveness of introducing generators based on renewable energy sources and energy storages in electric power systems.

  14. Vaye-Planaz drinking-water hydro-power installation; Petite centrale hydro-electrique de Vaye-Planaz sur le reseau d'eau potable de la commune de Grone. Etude de faisabilite. Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-02-15

    This final report for the Swiss Federal Office of Energy (SFOE) presents the concept for a hydro-power installation that uses an existing drinking-water supply system. The report takes a look at the present situation which features ground-water sources, a transport pipeline and two reservoirs. The concept for the use of the available water pressure due to height-difference to drive a turbine and so generate electricity is described. Variants considered are reviewed. Investment and operating costs are examined as are the electricity production and the cost of the power generated. Finally, investments and other financial aspects are looked at and the further course of action is discussed.

  15. Icogne irrigation-network hydro-power installation; Petite centrale hydro-electrique sur le reseau d'irrigation de la commune d'Icogne. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Cordonier, N.; Rey, G. [Nicolas Cordonier et Gilles Rey SA, Sierre (Switzerland)

    2007-01-15

    This final report for the Swiss Federal Office of Energy (SFOE) presents the feasibility study for a hydro-power installation that uses an existing municipal irrigation scheme in the alpine region of Icogne, Switzerland. The report takes a look at the present situation which features, apart from the irrigation scheme itself, mountain torrents and artificial compensation lakes. The concept for the use of the available water pressure due to height-difference between these two lakes to drive a turbine and so generate electricity is described. Variants considered are reviewed. Investment and operating costs are examined as are the electricity production and the cost of the power generated. Finally, investments and other financial aspects are looked at and the further course of action is discussed.

  16. Small hydro

    International Nuclear Information System (INIS)

    Bennett, K.; Tung, T.

    1995-01-01

    A small hydro plant in Canada is defined as any project between 1 MW and 15 MW but the international standard is 10 MW. The global market for small hydro development was considered good. There are some 1000 to 2000 MW of generating capacity being added each year. In Canada, growth potential is considered small, primarily in remote areas, but significant growth is anticipated in Eastern Europe, Africa and Asia. Canada with its expertise in engineering, manufacturing and development is considered to have a good chance to take advantage of these growing markets

  17. A multi-tank storage facility to effect power control in the PBMR power cycle

    International Nuclear Information System (INIS)

    Matimba, T.A.D.; Krueger, D.L.W.; Mathews, E.H.

    2007-01-01

    This article presents the concept of a storage facility used to effect power control in South Africa's PBMR power cycle. The concept features a multiple number of storage vessels whose purpose is to contain the working medium, helium, as it is withdrawn from the PBMR's closed loop power cycle, at low energy demand. This helium is appropriately replenished to the power cycle as the energy demand increases. Helium mass transfer between the power cycle and the storage facility, henceforth known as the inventory control system (ICS), is carried out by way of the pressure differential that exists between these two systems. In presenting the ICS concept, emphasis is placed on storage effectiveness; hence the discussion in this paper is centred on those features which accentuate storage effectiveness, namely:- Storage vessel multiplicity; - Unique initial pressures for each vessel arranged in a cascaded manner; and - A heat sink placed in each vessel to provide thermal inertia. Having presented the concept, the objective is to qualitatively justify the presence of each of the above-mentioned features using thermodynamics as a basis

  18. A new islanding detection technique for multiple mini hydro based on rate of change of reactive power and load connecting strategy

    International Nuclear Information System (INIS)

    Laghari, J.A.; Mokhlis, H.; Bakar, A.H.A.; Karimi, M.

    2013-01-01

    Highlights: • The requirement of DG interconnection with existing power system is discussed. • Various islanding detection techniques are discussed with their merits and demerits. • New islanding detection strategy is proposed for multiple mini hydro type DGs. • The proposed strategy is based on dq/dt and load connecting strategy. • The effectiveness of strategy is verified on various other cases. - Abstract: The interconnection of distributed generation (DG) into distribution networks is undergoing a rapid global expansion. It enhances the system’s reliability, while simultaneously reduces pollution problems related to the generation of electrical power. To fully utilize the benefits of DGs, certain technical issues need to be addressed. One of the most important issues in this context is islanding detection. This paper presents a new islanding detection technique that is suitable for multiple mini-hydro type DG units. The proposed strategy is based on the rate of change of reactive power and load connecting strategy to detect islanding within the system. For a large power mismatch, islanding is detected by rate of change of reactive power only. However, for a close power mismatch, the rate of change of reactive power initiates a load connecting strategy, which in turn alters the load on the distribution network. This load variation in the distribution network causes a variation in the rate of change of reactive power, which is utilized to distinguish islanding and other events. The simulation results show that the proposed strategy is effective in detecting islanding occurrence in a distribution network

  19. Hydro turbines: An introduction

    International Nuclear Information System (INIS)

    Gordon, J.L.

    1993-01-01

    The various types of hydraulic turbines currently used in hydroelectric power plants are described. The descriptions are intended for use by non-engineers who are concerned with fish passage and fish mortality at a hydro power facility. Terminology used in the hydro industry is explained. Since the extent of cavitation is one of the factors affecting mortality rates of fish passing through hydraulic turbines, an equation is introduced which measures the extent of cavitation likely to be experienced in a turbine. An example of how the cavitation index can be calculated is provided for two typical power plants. The relation between certain parameters of power plant operation and the extent of cavitation, and therefore of fish mortality, is illustrated. 2 refs., 14 figs

  20. Hydro-Quebec looks south

    International Nuclear Information System (INIS)

    Ross, P.

    1997-01-01

    The recent introduction of Hydro-Quebec, the Canadian utility, into selling cheap electric power in the United States (US) deregulated power market is described, following applications to the US Federal Energy Regulatory Commission. As its prices are so much cheaper than its US competitors, it is expected that the company will soon have many willing customers across the USA. Hydro-Quebec will remain a publicly owned utility, but has experienced restructuring in order to meet this new competitive challenge. (UK)

  1. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D. [British Columbia Hydro, Vancouver, BC (Canada)

    2004-07-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs.

  2. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    International Nuclear Information System (INIS)

    Druce, D.

    2004-01-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs

  3. Power of SNH with regard to storage of radioactive waste

    International Nuclear Information System (INIS)

    1991-01-01

    The debate relates to the powers of Scottish National Heritage and several new clauses were discussed. The first concerned the storage of radioactive wastes. The new clause would make it an offence for any person to store radioactive waste under the land without first informing Scottish National Heritage of their intention to do so. This allowed discussion on the proposal to use Dounreay or Caithness for deep nuclear storage. The main concern was over the safety of nuclear material and the consideration of public opinion which is against radioactive disposal at Dounreay. The question of the disposal of nuclear submarines and possible environmental damage was also raised. This part of the debate lasted about 2 hours. The new clause was defeated. Other clauses -about Scottish National Heritage's powers in relation to private roads, habitat management, access to the countryside and drought orders - were also debated. The whole debate lasted six hours and is reported verbatim. (UK)

  4. Thermal energy storage for a space solar dynamic power system

    Science.gov (United States)

    Faget, N. M.; Fraser, W. M., Jr.; Simon, W. E.

    1985-01-01

    In the past, NASA has employed solar photovoltaic devices for long-duration missions. Thus, the Skylab system has operated with a silicon photovoltaic array and a nickel-cadmium electrochemical system energy storage system. Difficulties regarding the employment of such a system for the larger power requirements of the Space Station are related to a low orbit system efficiency and the large weight of the battery. For this reason the employment of a solar dynamic power system (SDPS) has been considered. The primary components of an SDPS include a concentrating mirror, a heat receiver, a thermal energy storage (TES) system, a thermodynamic heat engine, an alternator, and a heat rejection system. The heat-engine types under consideration are a Brayton cycle engine, an organic Rankine cycle engine, and a free-piston/linear-alternator Stirling cycle engine. Attention is given to a system description, TES integration concepts, and a TES technology assessment.

  5. Vaksvikelva small hydro

    OpenAIRE

    Loe, Daniel Aarset

    2017-01-01

    Norway is in constant need of renewable energy, and hydroelectric power is still the main source. A great future potential can be found in countless small rivers scattered across the country, which could be developed through small hydro projects. In the process of converting mechanical movement - flowing water - into electric energy, about 5% turns into heat. From a power plant with an annual production of 15 GWh, this means energy enough to heat approximately 30 households is lost. In my pro...

  6. Using Free Flow Energy Cumulation in Wind and Hydro Power Production

    Directory of Open Access Journals (Sweden)

    Lev Ktitorov

    2016-09-01

    Full Text Available When approaching a conventional wind turbine, the air flow is slowed down and widened. This results in a loss of turbine efficiency. In order to exploit wind or water flow power as effectively as possible, it was suggested that the turbine should be placed inside a shroud, which consists of 4 wing-shaped surfaces. Two internal airfoils improve the turbine performance by speeding up the flow acting on the turbine blades, two external wings create a field of low pressure behind the turbine, thus, helping to draw more mass flow to the turbine and avoid the loss of efficiency due to flow deceleration.  The system accumulates kinetic energy of the flow in a small volume where the smaller (and, therefore, cheaper turbine can be installed. A smaller system can be installed inside the bigger one, which would help to accumulate even more kinetic energy on the turbine. We call this method the kinetic energy summation with local flow redistribution. Both experiments and CFD simulations demonstrate a significant increase in velocity and generated mechanical power in comparison of those for a bare turbine.

  7. Design and construction of Minokawai hydro-power station; Minokawai suiryoku hatsudensho no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Kudo, A; Murakami, H; Hatano, K [Kansai Electric Power Co. Inc., Osaka (Japan)

    1994-09-05

    Minokawai power station is a plant with low head and large water quantity (output: 23.4MW) that utilizes Imawatari dam down the Kiso river. In constructing this power station, vertical drilling of about 33m in depth was executed in soft sedimentary rock area with uniaxial compression strength of 100kgf/cm{sup 2} or so. This report describes the geological condition in the drilling area and the outline of design and execution of corresponding landslide preventions. The drilling area mainly consists of tuff-containing sandstone and conglomerate with several weak layers such as lignite layers, and its stratum slopes gently from the mountain side to the river side. When the landslide preventions were designed, it was especially considered to secure stability of the drilling surface of earth filling as well as to control shear deformation along the lignite layer. Based on the two-dimensional elasto-plastic FEM analysis, structural design of landslide prevention walls and reinforcing methods using ground anchors and lock-bolts were determined. Construction works have been proceeded with as the ground behavior has been measured and controlled by setting many instruments such as insertion-type clinometers on the landslide preventions and the back ground. 2 refs., 18 figs., 5 tabs.

  8. 76 FR 8724 - First Light Hydro Generating Company; Notice of Application Accepted for Filing, Soliciting...

    Science.gov (United States)

    2011-02-15

    ... recommendations filed. k. Description of Request: First Light Hydro Generating Company proposes to add a solar... Northfield Pump Storage Project (P-2485-059). The applicant states that the proposed 2MW utility grade photovoltaic solar array will provide power to Northfield Mountain Visitor's Center. The solar array would be...

  9. Magnet power supplies for the DORIS intersecting storage ring

    International Nuclear Information System (INIS)

    Narciss, H.; Hrabal, D.; Schlueter, W.

    1975-01-01

    Extremely precise, stable magnetic fields are required for guiding, deflecting and focussing electron and positron beams in the DORIS intersecting storage ring of the German Electron Synchrotron DESY. For the magnets producing these fields, Siemens has supplied a total of 29 precision-controlled power supplies in 17 different versions ranging from 1.5 kW to 4.9 kW. (orig.) [de

  10. Appraisal of Technical and Economic Potential Micro Hydro Power in Bali

    Directory of Open Access Journals (Sweden)

    Made Suarda

    2012-11-01

    Full Text Available Energy consumption particularly on electrical energy is continuously rising as a result of economical rising and community development. Therefore it needs to be responded about this condition by developing renewable energy utilization which is available. Renewable energy resources are possibly developed in Bali such as solar energy, wind energy, hydropower, sea energy, and biomass. However, one of renewable energy resources that is mostly possible to be developed in Bali is hydropower in micro scale wich is named microhydro. The microhydro works by using water flow which has debit and head. However, it needs an analysis both on technical and financial analysis. Technical analysis is carried out by checking debit and head of the water flow, and then calculates power would be generated, as well as the microhydro equipments such as a suitable choosen of turbine, generator, and control system. In other hand, financial analisis is carried out by estimating cost for construction the microhydro system, then by using Net Present Value (NPV analysis to check that the system is profitable to be constructed. The result noted that Bali has some potential microhydros or pycohydros that are profitable to be developed both on rivers and irrigations system. Financial analyses show that microhydro systems are profitable to be constructed (NPV is positive as long as their heads are at least 10 meters, in other side, debit are more affected their generated powers. However, in their implementations, there are some barriers in utilize those water flow resources as microhydro systems, such as those sites were used for other objects for instant as tourism destinations, or for cultures conservation, and the communities have not knew the advantages of microhydro yet therefore it needs socialization to the communities.

  11. Wind power impacts and electricity storage - a time scale perspective

    DEFF Research Database (Denmark)

    Hedegaard, Karsten; Meibom, Peter

    2012-01-01

    Integrating large amounts of wind power in energy systems poses balancing challenges due to the variable and only partly predictable nature of wind. The challenges cover different time scales from intra-hour, intra-day/day-ahead to several days and seasonal level. Along with flexible electricity...... demand options, various electricity storage technologies are being discussed as candidates for contributing to large-scale wind power integration and these also differ in terms of the time scales at which they can operate. In this paper, using the case of Western Denmark in 2025 with an expected 57% wind...... power penetration, wind power impacts on different time scales are analysed. Results show consecutive negative and high net load period lengths indicating a significant potential for flexibility measures capable of charging/activating demand and discharging/inactivating demand in periods of 1 h to one...

  12. Integrated operation of hydro thermal system

    International Nuclear Information System (INIS)

    Nanthakumar, J.

    1994-01-01

    Long-term power system expansion planning studies are carried out to meet the electricity requirement in the future. Prior to the expansion planning studies, it is essential to know the energy potential of the existing generating system, especially the hydro power plants. Detailed hydro thermal stimulation studies of the integrated system is therefore carried out to determine the best way to maximise the hydro energy of the existing and committed plants. The results of the integrated system simulated model are stored in numerous files and are available for retrieval. Most important output used for expansion analysis is the energy production of each hydro plant. The annual hydro energy potential of the total hydro system of Sri Lanka for the hydrological year from 1949 to 1988 is given. Hydro condition data with different probability levels are also indicated

  13. Rf power amplification by energy storage and switching

    International Nuclear Information System (INIS)

    Vernon, W.

    1989-01-01

    This paper reports that during the last decade there have been several suggestions for RF storage and switching schemes. The principle behind these schemes is simply that energy from a source which is on for a long time at moderate power can be stored in a resonant cavity and dumped (switched) in a short time to yield higher power. This is also the basis of SLED which is driving the SLC, but the major difference is in the switching and the proposed power gains. In the case of SLED there is no switch only a phase agile RF source, and the maximum power gain is about a factor of 3. Proposed storage and switching schemes are often based on large ratios of charge to discharge times, say 5 μsec/50 nsec = 100 which could be the power amplification ratio. An early demonstration of the switching of a superconducting cavity was reported. It was observed that a peak power gain of 9 at low power levels with a cold cavity and a room-temperature switch. The switch was a He gas filled tube positioned in the leg of a waveguide T so that a η/2 stub turned into a η/4 stub when the gas broke down and became a good conductor. All switches encountered to date are some variant of this technique; the stubs reflects back an out-of-phase signal which cancels the one from the cavity so that no power escapes while the low-loss dielectric tube is non-conducting

  14. Acoustic assessment report for Toronto Hydro Energy Services Inc. Ashbridge's Bay power generation facility

    International Nuclear Information System (INIS)

    Bernard, F.; Shinbin, N.

    2010-04-01

    This acoustic assessment report was conducted to determine the potential noise impacts of a biogas cogeneration plant that will be located on a street in a primarily industrial area of Toronto, Ontario. The facility will be comprised of seven 1.416 MW biogas-fired reciprocating engine generators and a single flare. The report presented results obtained from noise level calculations and noise modelling studies of the on-site equipment at the planned facility. The cogeneration plant will utilize biogas produced in existing digesters to generate electricity and hot water. The biogas will be produced by anaerobic digestion from municipal sewage waste at an adjacent facility. It is expected that the facility will generate 9.912 MW of electricity from the generators. Heat resulting from the biogas combustion process is recovered from engine and exhaust flue gases by heat exchangers. The facility will operate continuously. Significant noise sources at the facility include generator exhaust gas stacks; air intake points; building ventilation fans; and roof-top heat dump radiators. Sound power levels determined for each of the noise sources were based upon worst-case operating scenarios. Results of the assessment indicated that the facility is in compliance with all Ministry of the Environment (MOE) requirements. 5 refs., 10 tabs., 4 figs.

  15. Sealing of rock joints by induced calcite precipitation. A case study from Bergeforsen hydro power plant

    International Nuclear Information System (INIS)

    Hakami, E.; Qvarfort, U.; Ekstav, A.

    1991-01-01

    The possibilities of sealing rock fractures by injecting water saturated with calcite solution, and hereby inducing a calcite precipitation inside the fracture, is investigated. The way of reaction and the amount of calcite precipitation will depend on the saturation of calcium carbonate in the water, the temperature, the pH and the CO 2 -pressure. There is experience of lime-saturated water injection in the rock foundation below the dam at Bergeforsens power plant (1955-1968). It was observed that the consumption of injected lime water decreased with time. A possible reason to the decrease in lime water consumption is that calcite has precipitated such that the permeability of the rock in general is lowered. Another explanation to this could be that calcite precipitation is concentrated to the fractures surrounding the injection holes, thus preventing the lime water from penetrating further into the rock. It is recommended that further studies of the fracture fillings in drill cores from Bergeforsen is performed. The aim of such study should be to determine the extent of induced calcite precipitation and to investigate its chemical and physical properties. (authors)

  16. Research on Power System Scheduling Improving Wind Power Accommodation Considering Thermal Energy Storage and Flexible Load

    Science.gov (United States)

    Zou, Chenlu; Cui, Xue; Wang, Heng; Zhou, Bin; Liu, Yang

    2018-01-01

    In the case of rapid development of wind power and heavy wind curtailment, the study of wind power accommodation of combined heat and power system has become the focus of attention. A two-stage scheduling model contains of wind power, thermal energy storage, CHP unit and flexible load were constructed. This model with the objective function of minimizing wind curtailment and the operation cost of units while taking into account of the total coal consumption of units, constraint of thermal energy storage and electricity-heat characteristic of CHP. This paper uses MICA to solve the problem of too many constraints and make the solution more feasible. A numerical example showed that the two stage decision scheduling model can consume more wind power, and it could provide a reference for combined heat and power system short-term operation

  17. The design and performance of the first fully automatic non-grid 5 MW multi-diesel / mini hydro / battery converter power stations

    International Nuclear Information System (INIS)

    Ahmad Shadzli Abdul Wahab

    2000-01-01

    Electricity power supply in remote communities and towns are traditionally and hitherto supplied by diesel generator sets of varying capacities and sizes -from few kilowatt to few megawatts. Its proven to be versatile, robust, modular cheaper capital investment, reliable and easy to operate and maintain. These features are what make diesel generators most preferred choice for generating electric power to power hungry remote communities. The main draw back, though, is its increasingly high cost of operation and maintenance, largely due to upward trend in the cost of diesel fuel, high cost of engines spare parts plus the inflationary nature of salary and wages of operators. For these reasons, engineers and technologists have for years worked tirelessly to find ways and means to reduce the O and M costs. One of the novel ideas was to hybrid the conventional diesel generating system with renewable energy resources, such as mini hydro, solar photovoltaic or wind energy. Many prototypes involving several configurations of energy resources eg diesel/PV/ battery, diesel/wind/battery, diesel/mini hydro/battery have been tested but none has so far has been as successful as Sema/ Powercorp automated Intelligent Power System (IPS). Based on microprocessor hardware, powerful computer software programming and satellite communication technology, the IPS -equipped diesel power station can now now be operated fully automatic with capability of remote control and monitoring. The system is versatile in maximising the use of renewable energy energy resources such as wind, mini hydro or solar thereby reducing very significantly the use of diesel fuel. Operation and maintenance costs also are reduced due to the use of minimum manpower and and increase in fuel efficiency of the engines. The tested and proven IPS technology has been operating successfully for the last ten years in remote diesel stations in Northern Territory, Australia, Rathlin Island, Northern Ireland and its latest and

  18. Soil erosion and sediment delivery issues in a large hydro-electric power reservoir catchment, Ethiopia

    Science.gov (United States)

    Nebiyu, Amsalu; Dume, Bayu; Bode, Samuel; Ram, Hari; Boeckx, Pascal

    2017-04-01

    restoration and reduction of sediment flux are considered. The long term sustainability of HEP power generation in Ethiopia is evaluated in this context.

  19. Thermal hydro-dynamic behavior of the nuclear-powered ship Mutsu in the power-up test

    International Nuclear Information System (INIS)

    Ishida, Toshihisa; Kusunoki, Tsuyoshi; Tanaka, Yoshimi; Yao, Toshiaki; Inoue, Kimio; Ochiai, Masa-aki

    1991-01-01

    The first Japanese nuclear ship N.S. Mutsu was tested with heavy load changes as ones of the full scale start-up tests. This paper describes the results of power increasing test, test of crash astern propulsion from ahead cruising, and turbine trip test; In the power increasing test, the main steam flow rate increased from 20 % flow to 70 % flow in 13 seconds; In the test of crash astern propulsion from ahead cruising, an astern turbine maneuvering handle was drawn to the position equivalent to about 60 % reactor power in 30 seconds after an ahead turbine stopping; In the turbine trip test, the ahead turbine was tripped manually at about 100 % power operation. From these tests it was verified that the Mutsu reactor is capable to respond smoothly and safely to the heavy load change without reactor scram, without workings of the pressurizer relief valve and main steam dump valve, and without need of any manual adjustment of the reactor control system. (author)

  20. SUBWAY POWER SYSTEMS WITH MODERN SEMICONDUCTOR CONVERTERS AND ENERGY STORAGE DEVICES

    Directory of Open Access Journals (Sweden)

    O.I. Kholod

    2013-02-01

    Full Text Available Five subway power systems, a traditional power system and power systems with an active rectifier and an energy storage device, are considered. Estimation of energy loss in the analyzed subway power systems circuits is made.

  1. Customized electric power storage device for inclusion in a collective microgrid

    Science.gov (United States)

    Robinett, III, Rush D.; Wilson, David G.; Goldsmith, Steven Y.

    2016-02-16

    An electric power storage device is described herein, wherein the electric power storage device is included in a microgrid. The electric power storage device has at least one of a charge rate, a discharge rate, or a power retention capacity that has been customized for a collective microgrid. The collective microgrid includes at least two connected microgrids. The at least one of the charge rate, the discharge rate, or the power retention capacity of the electric power storage device is computed based at least in part upon specified power source parameters in the at least two connected microgrids and specified load parameters in the at least two connected microgrids.

  2. Modelling of thermo-hydro-mechanical couplings and damage of viscoplastic rocks in the context of radioactive waste storage; Modelisation des couplages thermo-hydro-mecaniques et de l'endommagement des roches viscoplastiques dans le contexte du stockage de dechets radioactifs

    Energy Technology Data Exchange (ETDEWEB)

    Kharkhour, H

    2002-12-01

    Trying to develop a model taking into account the complex rheology of a geologic media characterized by visco-plasticity, damage and thermo-hydro-mechanical couplings is unusual in geotechnics. This is not the case for radioactive waste storage that presents specificities from several viewpoints. Indeed, the scales of time and space concerned by this type of storage are disproportionate to those of civil engineering works or mines. Another specificity of the radioactive waste storage lies in the coupled processes involved. No effect likely to compromise the long-term security of the storage could be ignored. For example this is the case of damage, a phenomenon which does not necessarily lead to a major change of the mechanical behavior of the works but can influence the permeability of the medium in relation with a migration of radionuclides. It can be conceived that this phenomenon finds all its importance in the context of the thermo-hydro-mechanical couplings of a waste storage with high activity. However, the interaction between the damage and the THM coupled processes was the object of very few research subject up to now. This. is even more true for viscoplastic media considered as ductile, and therefore, less prone to cracking than brittle media. It is exactly in this 'original' but difficult context that took place the research presented in this report. This study was dedicated to the analysis of the phenomena and the thermal, hydraulic and mechanical couplings occurring in the near and far field of a high activity radioactive waste storage. Two examples of geological media were considered in this report: the clayey rock of Callovo-Oxfordian, called ' Argilites de l'Est ', target rock of the ANDRA project to carry out a subterranean laboratory for the study of long life radioactive waste storage; and the salt rock of the. subterranean laboratory in the old salt mine of Asse in Germany. (author)

  3. Power Oscillation Damping Controller for Wind Power Plant Utilizing Wind Turbine Inertia as Energy Storage

    DEFF Research Database (Denmark)

    Knüppel, Thyge; Nielsen, Jørgen Nygård; Jensen, Kim Høj

    2011-01-01

    For a wind power plant (WPP) the upper limit for active power output is bounded by the instantaneous wind conditions and therefore a WPP must curtail its power output when system services with active power are delivered. Here, a power oscillation damping controller (POD) for WPPs is presented...... that utilizes the stored kinetic energy in the wind turbine (WT) mechanical system as energy storage from which damping power can be exchanged. This eliminates the need for curtailed active power production. Results are presented using modal analysis and induced torque coefficients (ITC) to depict the torques...... induced on the synchronous generators from the POD. These are supplemented with nonlinear time domain simulations with and without an auxiliary POD for the WPP. The work is based on a nonlinear, dynamic model of the 3.6 MW Siemens Wind Power wind turbine....

  4. Good prospects for Portuguese small hydro industry

    International Nuclear Information System (INIS)

    Betamio de Almeida, A.; Serranho, H.

    2000-01-01

    The article outlines the history of hydro in Portugal and discusses the current position of small-scale hydro with particular reference to the Portuguese Small Hydro Association (AMPH). Encouraged by legislation, and the Valoren community programme (which defined investment incentives), many new small hydro projects sprang up in Portugal in the 1990s. In some areas of Portugal the water levels were higher than the urban centres where the water is required: how the problems of integrating power and water were addressed is described. The integration of power and irrigation schemes is also mentioned. In the wake of great expansion in the Portuguese hydro industry, there was a sharp reduction (in 1995-6) and the reasons for that are listed. The 1999 tariff was such that it is likely that small hydro will provide 3.8% of the electric power consumed nationally by 2010

  5. Intervention in independent spent fuel storage facility license application proceedings for storage on the power plant site

    International Nuclear Information System (INIS)

    Jordan, J.

    1992-01-01

    This presentation summarizes the intervention in the Nuclear Regulatory Commission (NRC) licensing process for currently operating Independent Spent fuel Storage Installation (ISFSI) projects at Carolina Power and Light's Company's H.B. Robinson, Duke Power Company's Oconee, and Virginia Power Company's Surry. In addition, intervention at dry storage facilities that are currently under development are also described. The utilities and reactors include Baltimore Gas and Electric Company's Calvert Cliffs, Public Service Company of Colorado's Fort St. Vrain plant, Northern States Power Company's Prairie Island, Wisconsin Electric Power Company's Point Beach, and Consumers Power Company's Palisades

  6. 77 FR 64973 - Don W. Gilbert Hydro Power, LLC; Notice of Application Accepted for Filing With the Commission...

    Science.gov (United States)

    2012-10-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14367-001] Don W. Gilbert...: Original Minor License. b. Project No.: 14367-001. c. Date filed: May 30, 2012. d. Applicant: Don W...(a)-825(r). (2006). h. Applicant Contact: Don W. Gilbert and DeAnn G. Somonich, Don W. Gilbert Hydro...

  7. Experimental power reactor dc generator energy storage study

    International Nuclear Information System (INIS)

    Heck, F.M.; Smeltzer, G.S.; Myers, E.H.; Kilgore, L.

    1978-01-01

    This study covers the use of dc generators for meeting the Experimental Power Reactor Ohmic Heating Energy Storage Requirements. The dc generators satisfy these requirements which are the same as defined in WFPS-TME-038 which covered the use of ac generators and homopolar generators. The costs of the latter two systems have been revised to eliminate first-of-a-kind factors. The cost figures for dc generators indicate a need to develop larger machines in order to take advantage of the economy-of-scale that the large ac machines have. Each of the systems has its own favorable salient features on which to base a system selection

  8. Remote micro hydro

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    The micro-hydro project, built on a small tributary of Cowley Creek, near Whitehorse, Yukon, is an important step in the development of alternative energy sources and in conserving expensive diesel fuel. In addition to demonstrating the technical aspects of harnessing water power, the project paved the way for easier regulatory procedures. The power will be generated by a 9 meter head and a 6 inch crossflow turbine. The 36 V DC power will be stored in three 12 V batteries and converted to ac on demand by a 3,800 watt inverter. The system will produce 1.6 kW or 14,016 kWh per year with a firm flow of 1.26 cfs. This is sufficient to supply electricity for household needs and a wood working shop. The project is expected to cost about $18,000 and is more economical than tying into the present grid system, or continuing to use a gasoline generator. An environmental study determined that any impact of the project on the stream would be negligible. It is expected that no other water users will be affected by the project. This pilot project in micro-hydro applications will serve as a good indicator of the viability of this form of alternate energy in the Yukon. The calculations comparing the micro-hydro and grid system indicate that the mico-hydro system is a viable source of inflation-proof power. Higher heads and larger flow resulting in ac generation in excess of 10 kW would yield much better returns than this project. 3 tabs.

  9. Rural hydro technology

    International Nuclear Information System (INIS)

    Fowlie, M.

    1999-01-01

    This paper examines the increasing use of micro hydroelectric schemes for power generation in mountainous communities in Asia to alleviate some of the pressures on forests. An example of such a scheme in Pakistan is given, and the installation and operation of small hydro units, socio-economic factors, and the impact of the projects on the position of women in the community are discussed. (UK)

  10. Influence of wind power, plug-in electric vehicles, and heat storages on power system investments

    International Nuclear Information System (INIS)

    Kiviluoma, Juha; Meibom, Peter

    2010-01-01

    Due to rising fuel costs, the substantial price for CO 2 emissions and decreasing wind power costs, wind power might become the least expensive source of power for an increasing number of power systems. This poses the questions of how wind power might change optimal investments in other forms of power production and what kind of means could be used to increase power system flexibility in order to incorporate the variable power production from wind power in a cost-effective manner. We have analysed possible effects using an investment model that combines heat and power production and simulates electric vehicles. The model runs in an hourly time scale in order to accommodate the impact of variable power production from wind power. Electric vehicles store electricity for later use and can thus serve to increase the flexibility of the power system. Flexibility can also be upgraded by using heat storages with heat from heat pumps, electric heat boilers and combined heat and power (CHP) plants. Results show that there is great potential for additional power system flexibility in the production and use of heat. (author)

  11. Wind energy-hydrogen storage hybrid power generation

    Energy Technology Data Exchange (ETDEWEB)

    Wenjei Yang; Orhan Aydin [University of Michigan, Ann Arbor, MI (United States). Dept. of Mechanical Engineering and Applied Mechanics

    2001-07-01

    In this theoretical investigation, a hybrid power generation system utilizing wind energy and hydrogen storage is presented. Firstly, the available wind energy is determined, which is followed by evaluating the efficiency of the wind energy conversion system. A revised model of windmill is proposed from which wind power density and electric power output are determined. When the load demand is less than the output of the generation, the excess electric power is relayed to the electrolytic cell where it is used to electrolyse the de-ionized water. Hydrogen thus produced can be stored as hydrogen compressed gas or liquid. Once the hydrogen is stored in an appropriate high-pressure vessel, it can be used in a combustion engine, fuel cell, or burned in a water-cooled burner to produce a very high-quality steam for space heating, or to drive a turbine to generate electric power. It can also be combined with organic materials to produce synthetic fuels. The conclusion is that the system produces no harmful waste and depletes no resources. Note that this system also works well with a solar collector instead of a windmill. (author)

  12. Optimizing MEMS-Based Storage Devices for Mobile Battery-Powered Systems

    NARCIS (Netherlands)

    Khatib, M.G.; Hartel, Pieter H.

    An emerging storage technology, called MEMS-based storage, promises nonvolatile storage devices with ultrahigh density, high rigidity, a small form factor, and low cost. For these reasons, MEMS-based storage devices are suitable for battery-powered mobile systems such as PDAs. For deployment in such

  13. Pulsed power inductive energy storage in the microsecond range

    International Nuclear Information System (INIS)

    Rix, W.; Miller, A.R.; Thompson, J.; Waisman, E.; Wilkinson, M.; Wilson, A.

    1993-01-01

    During the past five years Maxwell has developed a series of inductive energy storage (IES) pulsed power generators; ACE 1, ACE 2, ACE 3, and ACE 4, to drive electron-beam loads. They are all based on a plasma opening switch (POS) contained in a single vacuum envelope operating at conduction times of around one microsecond. They all employ fast capacitor bank technology to match this conduction time without intermediate power conditioning. Oil or air filled transmission lines transfer capacitor bank energy to a vacuum section where the final pulse compression is accomplished. Development of the ACE series is described, emphasizing capacitor bank and the opening switch technology for delivering high voltage, multimegampere pulses to electron beam loads

  14. The St. Niklausen drinking-water powered, small hydro scheme in Bad Ragaz; Gemeinde Bad Ragaz - Trinkwasserkraftwerk St. Niklausen - Vorstudie Bericht

    Energy Technology Data Exchange (ETDEWEB)

    Rueesch, T.

    2009-04-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at the results a preliminary study on the installation of a drinking-water powered small hydro scheme in Bad Ragaz, Switzerland. The installation of new pressure pipes and a new balancing reservoir are proposed. Three variants are proposed and discussed, two of which are considered as being economically viable. The various new installations and components proposed are described and discussed. Investment considerations, energy production and costs are looked at as well as support from the Swiss scheme for the cost-covering remuneration for electricity from renewable energy sources. The report is augmented with photos and plans.

  15. An Optimization Scheduling Model for Wind Power and Thermal Power with Energy Storage System considering Carbon Emission Trading

    Directory of Open Access Journals (Sweden)

    Huan-huan Li

    2015-01-01

    Full Text Available Wind power has the characteristics of randomness and intermittence, which influences power system safety and stable operation. To alleviate the effect of wind power grid connection and improve power system’s wind power consumptive capability, this paper took emission trading and energy storage system into consideration and built an optimization model for thermal-wind power system and energy storage systems collaborative scheduling. A simulation based on 10 thermal units and wind farms with 2800 MW installed capacity verified the correctness of the models put forward by this paper. According to the simulation results, the introduction of carbon emission trading can improve wind power consumptive capability and cut down the average coal consumption per unit of power. The introduction of energy storage system can smooth wind power output curve and suppress power fluctuations. The optimization effects achieve the best when both of carbon emission trading and energy storage system work at the same time.

  16. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  17. An Evaluation of Energy Storage Options for Nuclear Power

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bragg-Sitton, Shannon M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Dufek, Eric J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-06-01

    Energy supply, distribution, and demand are continuing to evolve as new generation sources come online and new appliances are installed. A larger percentage of the United States (U.S.) energy mix is provided by variable energy sources such as wind and solar each year, and distributed generation is becoming more common. In parallel, an evolution in consumer products such as electrical vehicles, information technology devices for residential and industrial applications, and appliances is changing how energy is consumed. As a result of these trends, nuclear power plants (NPPs) are being called upon to operate more flexibly than ever before. Furthermore, advanced nuclear power plants (A-NPPs) might operate as part of an electricity system that looks very different than when the current NPP fleet was constructed. A-NPPs face the possibility that they will need to operate in an environment where flexibility (e.g., fast ramping) is more highly valued than stability (e.g., baseload generation for conventional demand curves). The current fleet of NPPs is struggling to remain economical in competitive markets in an era of historically low natural gas prices and renewable sources with very low marginal costs. These factors, overlaid with an ambiguous national policy related to nuclear energy and a decision-making context that struggles with multi-decade capital investments, raise key questions and present significant challenges to the economics of nuclear power in the evolving grid. Multiple factors could improve the economics of A-NPPs, including: (1) minimizing the need for active safety systems, (2) minimizing adoption of one-off reactor designs, (3) establishing policies that credit low carbon emitting technologies, and (4) integrating energy storage technologies that increase revenue and reduce costs through a combination of ancillary services, market hedging, and reduced costs via stable operation. This report focuses on Item (4), containing an overview, synthesis, and

  18. An Evaluation of Energy Storage Options for Nuclear Power

    International Nuclear Information System (INIS)

    Coleman, Justin L.; Bragg-Sitton, Shannon M.; Dufek, Eric J.

    2017-01-01

    Energy supply, distribution, and demand are continuing to evolve as new generation sources come online and new appliances are installed. A larger percentage of the United States (U.S.) energy mix is provided by variable energy sources such as wind and solar each year, and distributed generation is becoming more common. In parallel, an evolution in consumer products such as electrical vehicles, information technology devices for residential and industrial applications, and appliances is changing how energy is consumed. As a result of these trends, nuclear power plants (NPPs) are being called upon to operate more flexibly than ever before. Furthermore, advanced nuclear power plants (A-NPPs) might operate as part of an electricity system that looks very different than when the current NPP fleet was constructed. A-NPPs face the possibility that they will need to operate in an environment where flexibility (e.g., fast ramping) is more highly valued than stability (e.g., baseload generation for conventional demand curves). The current fleet of NPPs is struggling to remain economical in competitive markets in an era of historically low natural gas prices and renewable sources with very low marginal costs. These factors, overlaid with an ambiguous national policy related to nuclear energy and a decision-making context that struggles with multi-decade capital investments, raise key questions and present significant challenges to the economics of nuclear power in the evolving grid. Multiple factors could improve the economics of A-NPPs, including: (1) minimizing the need for active safety systems, (2) minimizing adoption of one-off reactor designs, (3) establishing policies that credit low carbon emitting technologies, and (4) integrating energy storage technologies that increase revenue and reduce costs through a combination of ancillary services, market hedging, and reduced costs via stable operation. This report focuses on Item (4), containing an overview, synthesis, and

  19. Increasing RES Penetration and Security of Energy Supply by Use of Energy Storages and Heat Pumps in Croatian Energy System

    DEFF Research Database (Denmark)

    Krajačić, Goran; Mathiesen, Brian Vad; Duić, Neven

    2010-01-01

    electricity, heat and transport demands, and including renewable energy, power plants, and combined heat and power production (CHP) for district heating. Using the 2007 energy system the wind power share is increased by two energy storage options: Pumped hydro and heat pumps in combination with heat storages....... The results show that such options can enable an increased penetration of wind power. Using pumped hydro storage (PHS) may increase wind power penetration from 0.5 TWh, for existing PHS installations and up to 6 TWh for very large installations. Using large heat pumps and heat storages in combination...... with specific regulation of power system could additionally increase wind penetration for 0.37 TWh. Hence, with the current technologies installed in the Croatian energy system the installed pumped hydro-plant may facilitate more than 10% wind power in the electricity system. Large-scale integration of wind...

  20. [Ontario Hydro International Inc.]. Annual report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro International Inc. is the international representative of Ontario Hydro. OHII operates as a global utility that markets Ontario Hydro's services and products. Its mission is to be the leader in energy efficiency and sustainable development in the international marketplace. This report describes the year's activities in the following areas: Energy management and environment, hydroelectric generation, nuclear products and services, fossil generation, grid (transmission) business, utility management, Asia Power Group Inc. The document also includes financial highlights and international and customer contracts

  1. The HydroShare Collaborative Repository for the Hydrology Community

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  2. Considerations on the need for electricity storage requirements: Power versus energy

    International Nuclear Information System (INIS)

    Belderbos, Andreas; Virag, Ana; D’haeseleer, William; Delarue, Erik

    2017-01-01

    Highlights: • General storage principles are analyzed. • Storage units have different limitations (power versus energy). • Storage power and energy are required, dependent on residual profile. • Relationship between residual profile and optimal storage portfolio is derived. • Broadly applicable rules regarding optimal storage investments are presented. - Abstract: Different storage technologies enable an increasing share of variable renewable generation in the electricity system by reducing the temporal mismatch between generation and demand. Two storage ratings are essential to time-shift delivery of electricity to loads: electric power, or instantaneous electricity flow [W], and electric energy, or power integrated over time [Wh]. An optimal storage portfolio is likely composed of multiple technologies, each having specific power and energy ratings. This paper derives and explains the link between the shape of the time-varying demand and generation profiles and the amount of desirably installed storage capacity, both energy and power. An analysis is performed for individual storage technologies first, showing a link between the necessary power and energy capacity and the demand and generation profile. Then combinations of storage technologies are analyzed to reveal their mutual interaction in a storage portfolio. Results show an increase in desirability for storage technologies with low cost power ratings when the mismatch between generation and demand occurs in daily to weekly cycles. Storage technologies with low cost energy ratings are preferred when this mismatch occurs in monthly to seasonal cycles. The findings of this work can help energy system planners and policy makers to explain results from generation expansion planning studies and to isolate the storage benefits accountable to temporal arbitrage in broader electricity storage studies.

  3. Challenging hydro-hegemony

    DEFF Research Database (Denmark)

    Wessels, Josepha Ivanka

    2015-01-01

    Bank. Both case studies show that control over water resources and supply provides political power over others at local level. Yet non-violent resistance can be observed in these border areas. In border areas between Israel, Syria and Palestine, control over access and water supply plays an important...... role in the ability of Israel to exercise hegemonic power in daily hydro-politics, which in the long term is detrimental for the people and the environment and disrupts the hydrological balance in the entire Jordan River basin....

  4. Short Term Energy Storage for Grid Support in Wind Power Applications

    DEFF Research Database (Denmark)

    Stroe, Daniel Ioan; Stan, Ana-Irina; Diosi, Robert

    2012-01-01

    The penetration of wind power into the power system has been increasing in the recent years. Therefore, a lot of concerns related to the reliable operation of the power system have been addressed. An attractive solution to minimize the limitations faced by the wind power grid integration, and thus...... to increase the power system stability and the energy quality, is to integrate energy storage devices into wind power plants. This paper gives an overview of the state-of-the-art short-term energy storage devices and presents several applications which can be provided by the energy storage device - wind power...

  5. Storage the electric power: yes, it is indispensable and it is possible. Why, where, how

    International Nuclear Information System (INIS)

    2003-01-01

    This document describes the main characteristics of various electric power storage methods and their application domains. The large-scale storages include the hydraulic systems, those using compressed air, the batteries or those implementing a thermal way. The small-scale storages are electrochemical as the accumulators, the super-capacitors, mechanical as the flywheel, magnetic or also by the hydrogen use. The first part presents the necessity of the electric power storage, the second part the places of these storage. The third part details the forms of storage. (A.L.B.)

  6. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  7. Energy supply technologies. Hydro, ocean, wave and tidal

    Energy Technology Data Exchange (ETDEWEB)

    Fenhann, J.; Larsen, Hans [Risoe National Lab. - DTU (Denmark)

    2007-11-15

    This chapter presents an overview of current hydro, ocean, wave and tidal initiatives. Large hydro remains one of the lowest-cost generating technologies, although environmental constraints, resettlement impacts and the limited availability of sites have restricted further growth in many countries. Large hydro supplied 16 % of global electricity in 2004, down from 19 % a decade ago. Large hydro capacity totalled about 720 GW worldwide in 2004 and has grown historically at slightly more than 2 % annually. China installed nearly 8 GW of large hydro in 2004, taking the country to number one in terms of installed capacity (74 GW). With the completion of the Three Gorges Dam, China will add some 18.2 GW of hydro capacity in 2009. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic cost of hydro includes displacements and submergence. Further hydro can improve peak-capacity management. Ocean currents, some of which runs close to European coasts, carry a lot of kinetic energy. Part of this energy can be captured by sub-marine windmills and converted into electricity. These are more compact than the wind turbines used on land, simply because water is much denser than air. The main European countries with useful current power potential are France and the UK. Ocean tides are driven by the gravitational pull of the moon. With one high tide every 12 hours, a tidal power plant can operate for only four or five hours per cycle, so power from a single plant is intermittent. A suitably-designed tidal plant can, however, operate as a pimped storage system, using electricity during periods of low demand to store energy that can be recovered later. The only large, modern example of a tidal power plant is the 240 MW La Rance plant, built in France in the 1960s, which represents 91 % of the world tidal power capacity. Wave energy can be seen as

  8. Short-term hydro-thermal-wind complementary scheduling considering uncertainty of wind power using an enhanced multi-objective bee colony optimization algorithm

    International Nuclear Information System (INIS)

    Zhou, Jianzhong; Lu, Peng; Li, Yuanzheng; Wang, Chao; Yuan, Liu; Mo, Li

    2016-01-01

    Highlights: • HTWCS system is established while considering uncertainty of wind power. • An enhanced multi-objective bee colony optimization algorithm is proposed. • Some heuristic repairing strategies are designed to handle various constraints. • HTWCS problem with economic/environment objectives is solved by EMOBCO. - Abstract: This paper presents a short-term economic/environmental hydro-thermal-wind complementary scheduling (HTWCS) system considering uncertainty of wind power, as well as various complicated non-linear constraints. HTWCS system is formulated as a multi-objective optimization problem to optimize conflictive objectives, i.e., economic and environmental criteria. Then an enhanced multi-objective bee colony optimization algorithm (EMOBCO) is proposed to solve this problem, which adopts Elite archive set, adaptive mutation/selection mechanism and local searching strategy to improve global searching ability of standard bee colony optimization (BCO). Especially, a novel constraints-repairing strategy with compressing decision space and a violation-adjustment method are used to handle various hydraulic and electric constraints. Finally, a daily scheduling simulation case of hydro-thermal-wind system is conducted to verify feasibility and effectiveness of the proposed EMOBCO in solving HTWCS problem. The simulation results indicate that the proposed EMOBCO can provide lower economic cost and smaller pollutant emission than other method established recently while considering various complex constraints in HTWCS problem.

  9. Combining Energy Conversion and Storage: A Solar Powered Supercapacitor

    International Nuclear Information System (INIS)

    Narayanan, Remya; Kumar, P. Naresh; Deepa, Melepurath; Srivastava, Avanish Kumar

    2015-01-01

    Graphical abstract: - Highlights: • A plasmonic TiO_2/CdS/Au fibers photoanode is fabricated for the first time. • The efficiency of the plasmonic cell is greater by 1.35 times than the non-plasmonic one. • A solar powered supercapacitor is developed with plasmonic photoanode and multiwalled carbon nanotubes. • The solar cell current charges the supercapacitor. • A specific capacitance of 150 F g"−"1 is achieved under sunlight without any external bias. - Abstract: A solar powered supercapacitor wherein a plasmonic quantum dot solar cell (QDSC) sources the photocurrent for charging/discharging a conjoined supercapacitor based on multiwalled carbon nanotubes (MWCNTs) is demonstrated. Gold or Au fibers are integrated into a titanium dioxide/cadmium sulfide (TiO_2/CdS) electrode to yield a TiO_2/CdS/Au photoanode. The plasmonic effect of Au fibers is reflected in the higher incident photon to current conversion efficiency (IPCE = 55%) and an improved overall power conversion efficiency (3.45%) produced by the TiO_2/CdS/Au photoanode relative to the non-plasmonic TiO_2/CdS photoanode. A Janus type bi-functional electrode composed of MWCNTs on either face separated by glass is prepared and it is coupled with the TiO_2/CdS/Au electrode and another MWCNT electrode to yield the tandem solar powered supercapacitor. By channelling the photocurrent produced by the QDSC part, under 0.1 sun illumination, the capacitance of the symmetric supercapacitor, without the application of any external bias is 150 F g"−"1 which compares well with reported values of electrically powered MWCNT supercapacitors. Our innovative design for a photo-supercapacitor offers a new paradigm for combining low cost photovoltaics with energy storage to yield a technologically useful device that needs nothing else other than solar energy to run.

  10. Optimal Placement of Energy Storage and Wind Power under Uncertainty

    Directory of Open Access Journals (Sweden)

    Pilar Meneses de Quevedo

    2016-07-01

    Full Text Available Due to the rapid growth in the amount of wind energy connected to distribution grids, they are exposed to higher network constraints, which poses additional challenges to system operation. Based on regulation, the system operator has the right to curtail wind energy in order to avoid any violation of system constraints. Energy storage systems (ESS are considered to be a viable solution to solve this problem. The aim of this paper is to provide the best locations of both ESS and wind power by optimizing distribution system costs taking into account network constraints and the uncertainty associated to the nature of wind, load and price. To do that, we use a mixed integer linear programming (MILP approach consisting of loss reduction, voltage improvement and minimization of generation costs. An alternative current (AC linear optimal power flow (OPF, which employs binary variables to define the location of the generation, is implemented. The proposed stochastic MILP approach has been applied to the IEEE 69-bus distribution network and the results show the performance of the model under different values of installed capacities of ESS and wind power.

  11. Autonomous wind/solar power systems with battery storage

    Energy Technology Data Exchange (ETDEWEB)

    Protogeropoulos, C I

    1993-12-31

    The performance of an autonomous hybrid renewable energy system consisting of combined photovoltaic/wind power generation with battery storage is under evaluation in this thesis. Detailed mathematical analysis of the renewable components and the battery was necessary in order to establish the theoretical background for accurate simulation results. Model validation was achieved through experimentation. The lack of a sizing method to combine both hybrid system total cost and long-term reliability level was the result of an extended literature survey. The new achievements which are described in this research work refer to: - simplified modelling for the performance of amorphous-silicon photovoltaic panels for all solar irradiance levels. -development of a new current-voltage expression with respect to wind speed for wind turbine performance simulation. -establishment of the battery storage state of voltage, SOV, simulation algorithm for long-term dynamic operational conditions. The proposed methodology takes into account 8 distinct cases covering steady state and transient effects and can be used for autonomous system reliability calculations. -techno-economic evaluation of the size of the hybrid system components by considering both reliability and economic criteria as design parameters. Two sizing scenarios for the renewable components are examined : the average year method and the ``worst renewable`` month method. (Author)

  12. Thermoelectric Powered Wireless Sensors for Dry-Cask Storage

    Science.gov (United States)

    Carstens, Thomas Alan

    This study focuses on the development of self-powered wireless sensors. These sensors can be used to measure key parameters in extreme environments; e.g., temperature monitoring for spent nuclear fuel during dry-cask storage. This study has developed a design methodology for these self-powered monitoring systems. The main elements that constitute this work consist of selecting and testing a power source for the wireless sensor, determination of the attenuation of the wireless signal, and testing the wireless sensor circuitry in an extreme environment. OrigenArp determined the decay heat and gamma/neutron source strength of the spent fuel throughout the service life of the dry-cask. A first principles analysis modeled the temperatures inside the dry-cask. A finite-element heat transfer code calculated the temperature distribution of the thermoelectric and heat sink. The temperature distributions determine the power produced by the thermoelectric. It was experimentally verified that a thermoelectric generator (HZ-14) with a DC/DC converter (Linear Technology LTC3108EDE) can power a transceiver (EmbedRF) at condition which represent prototypical conditions throughout and beyond the service life of the dry-cask. The wireless sensor is required to broadcast with enough power to overcome the attenuation from the dry-cask. It will be important to minimize the attenuation of the signal in order to broadcast with a small transmission power. To investigate the signal transmission through the dry-cask, CST Microwave Studio was used to determine the scattering parameter S2,1 for a horizontal dry-cask. Important parameters that can influence the transmission of the signal are antenna orientation, antenna placement, and transmission frequency. The thermoelectric generator, DC/DC converter, and transceiver were exposed to 60Co gamma radiation (exposure rate170.3 Rad/min) at the University of Wisconsin Medical Radiation Research Center. The effects of gamma radiation on the

  13. Electric Vehicle Based Battery Storages for Future Power System Regulation Services

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2009-01-01

    supplying the reserve power requirements. This limited regulation services from conventional generators in the future power system calls for other new reserve power solutions like Electric Vehicle (EV) based battery storages. A generic aggregated EV based battery storage for long-term dynamic load frequency...

  14. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Mariano, S.J.P.S. [Beira Interior Univ., Covilha (Portugal). Dept. of Electromechanical Engineering; Mendes, V.M.F. [Superior Engineering Inst. of Lisbon, Lisbon (Portugal). Dept. of Electrical Engineering and Automation; Ferreira, L.A.F.M. [Technical Univ. of Lisbon, Superior Technical Inst., Lisbon (Portugal). Dept. of Electrical Engineering and Computers

    2008-07-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs.

  15. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2008-01-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs

  16. Fifteen years of radioactive waste management at Ontario Hydro

    International Nuclear Information System (INIS)

    Carter, T.J.; Rao, P.K.M.

    1985-01-01

    Ontario Hydro is a large Canadian utility producing 84% (7394 MWe) of the Nuclear Electricity generated in Canada. The low- and intermediate-level radioactive wastes generated by the Ontario Hydro program are currently being managed at the Bruce Nuclear Power Development with various volume reduction, packaging and interim storage systems. Ontario Hydro also owns and operates a radioactive waste transportation system. Studies are in progress for final disposal of these wastes in a suitable geology in Ontario. Since its inception in 1971, Ontario Hydro's radioactive waste management program has evolved into providing a full fledged radioactive waste management capability to the utility's two nuclear generation centres at Pickering and Bruce, and later in the decade, to Darlington. This paper summarizes the various developments in this program; highlights the major facilities both in-service and planned to be built; reviews the experiences gained over fifteen years of in-house waste management; and discusses the proposed reorientation towards ultimate disposal of these wastes. 2 refs., 8 figs., 1 tab

  17. Decay heat power of spent nuclear fuel of power reactors with high burnup at long-term storage

    Science.gov (United States)

    Ternovykh, Mikhail; Tikhomirov, Georgy; Saldikov, Ivan; Gerasimov, Alexander

    2017-09-01

    Decay heat power of actinides and fission products from spent nuclear fuel of power VVER-1000 type reactors at long-term storage is calculated. Two modes of storage are considered: mode in which single portion of actinides or fission products is loaded in storage facility, and mode in which actinides or fission products from spent fuel of one VVER reactor are added every year in storage facility during 30 years and then accumulated nuclides are stored without addition new nuclides. Two values of fuel burnup 40 and 70 MW·d/kg are considered for the mode of storage of single fuel unloading. For the mode of accumulation of spent fuel with subsequent storage, one value of burnup of 70 MW·d/kg is considered. Very long time of storage 105 years accepted in calculations allows to simulate final geological disposal of radioactive wastes. Heat power of fission products decreases quickly after 50-100 years of storage. The power of actinides decreases very slow. In passing from 40 to 70 MW·d/kg, power of actinides increases due to accumulation of higher fraction of 244Cm. These data are important in the back end of fuel cycle when improved cooling system of the storage facility will be required along with stronger radiation protection during storage, transportation and processing.

  18. Decay heat power of spent nuclear fuel of power reactors with high burnup at long-term storage

    Directory of Open Access Journals (Sweden)

    Ternovykh Mikhail

    2017-01-01

    Full Text Available Decay heat power of actinides and fission products from spent nuclear fuel of power VVER-1000 type reactors at long-term storage is calculated. Two modes of storage are considered: mode in which single portion of actinides or fission products is loaded in storage facility, and mode in which actinides or fission products from spent fuel of one VVER reactor are added every year in storage facility during 30 years and then accumulated nuclides are stored without addition new nuclides. Two values of fuel burnup 40 and 70 MW·d/kg are considered for the mode of storage of single fuel unloading. For the mode of accumulation of spent fuel with subsequent storage, one value of burnup of 70 MW·d/kg is considered. Very long time of storage 105 years accepted in calculations allows to simulate final geological disposal of radioactive wastes. Heat power of fission products decreases quickly after 50-100 years of storage. The power of actinides decreases very slow. In passing from 40 to 70 MW·d/kg, power of actinides increases due to accumulation of higher fraction of 244Cm. These data are important in the back end of fuel cycle when improved cooling system of the storage facility will be required along with stronger radiation protection during storage, transportation and processing.

  19. Small-scale hydro-power plant in Quinto - Preliminary project; Progetto minicentrale idroelettrica, Ri Secco - Quinto. Programma piccole centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-06-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the alpine stream 'Ri Secco' in the municipality of Quinto, southern Switzerland. The Ri Secco partly flows in a steep canyon. The elevation difference of 810 or 620 m (depending on the location of the water deviation from the stream) is favorable to the installation of a small-scale high-head power plant. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include two possible penstock diameters for each weir location. The electricity production expected is discussed, as is the economic viability of the project.

  20. Hydro-power installation at Fein-Elast Grabher AG in Lichtensteig - Preliminary study; Fein-Elast Grabher AG - Lichtensteig. Stauwehr / Schleusenbruecke / Wasserkraftanlage. Vorprojektstudie - Technischer Bericht

    Energy Technology Data Exchange (ETDEWEB)

    Hintermann, M.

    2008-07-01

    This technical report for the Swiss Federal Office of Energy (SFOE) describes project variants for the replacement of a hydro-power plant on the River Thur in Lichtensteig, Switzerland. The new installation is to produce more power by using a greater volume of water than the old installation, parts of which date from 1820. The report reviews possibilities for and restrictions on the renewal of the installation and recommends one of four possible variants proposed.. Water-flow statistics and flood-protection issues are discussed. Environmental issues connected with the project are also examined. Energy production figures, cost estimates and economic viability issues are discussed. The proposed course of events involved in replacing the hydropower installation and an associated road bridge is described.

  1. Retrofitting of the hydro-power installation of Vicques, Switzerland; Rehabilitation de la centrale de Vicques, Emile Aebin SA. Etude d'avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    This technical report for the Swiss Federal Office of Energy (SFOE) reports on work involved in obtaining a new concession for the use of the water in the mill canal in Vicques, Switzerland on the Scheulte river. The author states that the existing concession for use is not optimal and should be optimised. A window of opportunity exists as a new river protection law requires a higher residual water flow rate and the creation of a fish passage facility. The paper discusses how the production of electrical energy could be doubled. The existing installation is described. Details of existing conduits and the installed power generator are presented. The measures proposed for the renewal of the hydro-power plant are described. An annex includes a copy of the construction plans.

  2. Enhancement of the Haemmerli hydro power installation in Lenzburg, Switzerland; Gemeinde Lenzburg (AG). Ausbau Kraftwerk Haemmerli - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-08-15

    This preliminary report for the Swiss Federal Office of Energy (SFOE) presents a project on the refurbishment of an old industrial small hydro installation on the Aabach stream in Lenzburg, Switzerland. The state of the existing installation is described as is the station's concession. The proposals for the renewal of this installation are described and discussed. The necessary building work and the installations required are examined. Investment costs, operating and maintenance costs and expected profitability are discussed. The report is completed with suggestions for further work.

  3. New construction of the Wespimuehle small hydro power station in Winterthur, Switzerland; Stadt Winterthur (ZH). Neubau Kleinwasserkraftwerk Wespimuehle - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents a project concerning the renewal of an existing small hydro installation in the historical Wespimuehle on the Toess river in Winterthur, Switzerland. The existing installation is described as is the station's present concession. The proposals for the renewal of this installation are described and discussed, including water intake, electro-mechanical components and the station's tail water channel. The necessary building work and access to the installations are discussed. Investment, operating and maintenance costs are discussed. The expected profits to be gained from the new installation and the risks involved in the project are discussed.

  4. Economic feasibility of pipe storage and underground reservoir storage options for power-to-gas load balancing

    International Nuclear Information System (INIS)

    Budny, Christoph; Madlener, Reinhard; Hilgers, Christoph

    2015-01-01

    Highlights: • Study of cost effectiveness of power-to-gas and storage of H 2 and renewable methane. • NPV analysis and Monte Carlo simulation to address fuel and electricity price risks. • Gas sale is compared with power and gas market arbitrage and balancing market gains. • Power-to-gas for linking the balancing markets for power and gas is not profitable. • Pipe storage is the preferred option for temporal arbitrage and balancing energy. - Abstract: This paper investigates the economic feasibility of power-to-gas (P2G) systems and gas storage options for both hydrogen and renewable methane. The study is based on a techno-economic model in which the net present value (NPV) method and Monte Carlo simulation of risks and price forward curves for the electricity and the gas market are used. We study three investment cases: a Base Case where the gas is directly sold in the market, a Storage & Arbitrage Case where temporal arbitrage opportunities between the electricity and the gas market are exploited, and a Storage & Balancing Case where the balancing markets (secondary reserve market for electricity, external balancing market for natural gas) are addressed. The optimal type and size of different centralized and decentralized storage facilities are determined and compared with each other. In a detailed sensitivity and cost analysis, we identify the key factors which could potentially improve the economic viability of the technological concepts assessed. We find that the P2G system used for bridging the balancing markets for power and gas cannot be operated profitably. For both, temporal arbitrage and balancing energy, pipe storage is preferred. Relatively high feed-in tariffs (100 € MW −1 for hydrogen, 130 € MW −1 for methane) are required to render pipe storage for P2G economically viable

  5. Progressive technologies, modernization of hydro power projects aimed at rationalization in a use of hydroenergetic potential and environment protection

    International Nuclear Information System (INIS)

    Sabela, P. et al.

    1997-01-01

    A process of modernization of nodes of equipment of hydroelectric power plants (HPPs) and pumped storage plants (PSPs) has been extended lately to cover all pieces of equipment of HPP aimed at an increase in effectiveness of HPP as a unit. Turbine wheels of selected HPPs were replaced in the past , replacement of impellers of pumps of machines in PSP Cierny Vah started started at present and a complex modernization of our oldest HPP Ladce (1936) is planned aimed at an increase in absorption capacity of water turbines with an increase in their efficiency. The process of increasing the efficiency of the existing units without substantial construction changes in blocks of turbines gives also economic acceptability to the mentioned approaches from the point of view of both the gained installed capacity and electrical energy production compared to an option of building a modern HPP and it is also more acceptable from the point of view of environment protection than newly built HPPs. All of the technical changes, a process of increases of increasing the use of a hydroenergetic potential and also environment protection are being realized and will be realized only by high quality workers. Thus a program of transition to a more effective provision of activities with simultaneous increase in qualification and multipurpose use of labor force is a part of the equipment development program

  6. Progressive technologies, modernization of hydro power projects aimed at rationalization in a use of hydroenergetic potential and environment protection

    Energy Technology Data Exchange (ETDEWEB)

    Sabela, P

    1997-12-01

    A process of modernization of nodes of equipment of hydroelectric power plants (HPPs) and pumped storage plants (PSPs) has been extended lately to cover all pieces of equipment of HPP aimed at an increase in effectiveness of HPP as a unit. Turbine wheels of selected HPPs were replaced in the past , replacement of impellers of pumps of machines in PSP Cierny Vah started started at present and a complex modernization of our oldest HPP Ladce (1936) is planned aimed at an increase in absorption capacity of water turbines with an increase in their efficiency. The process of increasing the efficiency of the existing units without substantial construction changes in blocks of turbines gives also economic acceptability to the mentioned approaches from the point of view of both the gained installed capacity and electrical energy production compared to an option of building a modern HPP and it is also more acceptable from the point of view of environment protection than newly built HPPs. All of the technical changes, a process of increases of increasing the use of a hydroenergetic potential and also environment protection are being realized and will be realized only by high quality workers. Thus a program of transition to a more effective provision of activities with simultaneous increase in qualification and multipurpose use of labor force is a part of the equipment development program.

  7. Electricity storage. A solution for wind power integration? Study on the economic and institutional aspects of the implementation of electricity storage for the integration of wind power

    International Nuclear Information System (INIS)

    Hendriks, R.H.

    2004-06-01

    In today's society a power outage can lead to major financial damage. It is therefore of high importance that the electricity system is reliable and that customers can rely on high security of supply. To prevent power outages, the electricity system has to be in balance continuously: supply and load have to be equal. Currently the majority of the electricity generation is done by conventional power plants of which the operation schedule is fully controllable. This means that these plants can be operated in such a way that electricity demand, which varies during the day, can be met continuously. The integration of a large share of wind power in the electricity supply system however, can lead to problems with respect to the balancing of the electricity system. This is caused by the fact that wind power has an intermittent character. Its production fluctuates and is uncertain: it therefore cannot be used to follow the varying load. Electricity storage could contribute to the integration of wind power in the electricity supply system. Storage systems can decouple the timing of generation and consumption of electricity and can therefore compensate for the fluctuations in wind power production. This investigation aims at identifying what problems the integration of a large share of wind power will cause and how electricity storage can resolve these problems. Subsequently, the implementation costs of storage systems for the identified applications will be investigated. Finally, the current regulatory environment will be discussed to evaluate whether it is geared to the implementation of electricity storage. Therefore, the following research question is formulated: Under which technological and institutional preconditions will it be advantageous to implement electricity storage systems, in combination with wind farms, in the next 20 years? To answer the research question the following subquestions have been formulated: (1) What are the implications of the market design on

  8. Determination of Optimum Performance Strategy of Energy Storage in Power System

    Directory of Open Access Journals (Sweden)

    Mohammad Hosein Ranjbari

    2016-06-01

    Full Text Available Determination of optimal capacity for today energy storages has been specially noticed. The delay in increasing storage production capacity is one of the applications for energy storage supplies in which utilization from energy storage supplies along with improvement in the power status at peak hours of consumption may postpone the demand for installation of a new power plant module. In this essay, the optimal capacity of energy storage is determined in order to reduce exploitation costs by second-order non linear programming. This method expresses this problem with a target quadratic function based on the produced power of units and capacity of energy storage supply. The requirements have been modeled as linear equality and inequality equations. The related constraints for produced power and incremental and decremental power ratio in generators have been considered as well.

  9. Ontario Hydro Research Division annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Research Division of Ontario Hydro conducts research in the fields of chemistry, civil engineering, electrical engineering, mechanical engineering, metallurgy, and operations. Much of the research has a bearing on the safe, environmentally benign operation of Ontario Hydro's nuclear power plants. Particular emphasis has been placed on nuclear plant component aging and plant life assurance

  10. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    International Nuclear Information System (INIS)

    Bregar, Zvonko

    2007-01-01

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  11. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    Energy Technology Data Exchange (ETDEWEB)

    Bregar, Zvonko [Milan Vidmar Electric Power Research Institute, Hajdrihova 2, SI-1000 Ljubljana (Slovenia)

    2007-08-15

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  12. Generic environmental impact statement on handling and storage of spent light water power reactor fuel. Appendices

    International Nuclear Information System (INIS)

    1978-03-01

    Detailed appendices are included with the following titles: light water reactor fuel cycle, present practice, model 1000MW(e) coal-fired power plant, increasing fuel storage capacity, spent fuel transshipment, spent fuel generation and storage data (1976-2000), characteristics of nuclear fuel, and ''away-from-reactor'' storage concept

  13. Technical and Economic Assessment of Storage Technologies for Power-Supply Grids

    Directory of Open Access Journals (Sweden)

    H. Meiwes

    2009-01-01

    Full Text Available Fluctuating power generation from renewable energies such as wind and photovoltaic are a technical challenge for grid stability. Storage systems are an option to stabilise the grid and to maximise the utilisation factors of renewable power generators. This paper analyses the state of the art of storage technologies, including a detailed life cycle cost comparison. Beside this, benefits of using storage systems in electric vehicles are analysed and quantified. A comprehensive overview of storage technologies as well as possible applications and business cases for storage systems is presented. 

  14. Hydro One 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Financial information from Hydro One was presented and a review of its 2002 operations was made available for the benefit of shareholders. Hydro One is the largest electricity delivery company in Ontario and one of the largest in North America. It began operation in 1999 after Ontario Hydro restructured its delivery and generation entities. Hydro One now includes power transmission, power distribution and telecom, with transmission and distribution operations representing 99 per cent of its business. This report indicates that in 2002, the utility had strong financial performance with $344 million in net income. The utility met its health and safety targets, and established a customer advisory board to improve customer satisfaction. A layer of management at the executive level was eliminated to stream-line decision-making and enhance productivity. The electricity network was upgraded and maintained through $546 million in capital expenditures. Non-core functions were sold to ensure a better focus on the core business of electricity delivery. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Hydro One and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  15. Overview of the Energy Storage Systems for the Wind Power Integration Enhancement

    DEFF Research Database (Denmark)

    Swierczynski, Maciej Jozef; Teodorescu, Remus; Rasmussen, Claus Nygaard

    2010-01-01

    intermittency, partly unpredictability and variability, wind power can put the operation of power system into risk. This can lead to problems with grid stability, reliability and the energy quality. One of the possible solutions can be an addition of energy storage into wind power plant. This paper deals...... with state of the art of the Energy Storage (ES) technologies and their possibility of accommodation for wind turbines. Overview of ES technologies is done in respect to its suitability for Wind Power Plant (WPP). Services that energy storage can offer both to WPP and power system are discussed. Moreover...

  16. Energy balance of hydro-aggregate with Pelton water turbine

    International Nuclear Information System (INIS)

    Obretenov, V.

    2005-01-01

    One of the major tasks in the field of hydraulic power engineering refers to machines and equipment modernization in the hydropower plants and pumped storage power plants commissioned more than 20 years ago. The increase of hydraulic units operation efficiency will allow in a number of cases to substantially reduce the specific water consumption and to drive the output of electric energy up. In these cases it is crucial to find out the operational efficiency of individual system elements and to precisely focus the modernization endeavours on such elements where the energy losses go beyond all admissible limits. Besides, the determination of the energy losses in the hydro energy turbo system will allow valid defining of hydraulic units operational scope. This work treats the methods of balance study of a hydraulic unit with Peiton water turbine. The experimental results of the balance study of Belmeken pumped storage power plant hydraulic unit No 5 under turbine operational mode are presented

  17. Dynamic analysis of a pumped-storage hydropower plant with random power load

    Science.gov (United States)

    Zhang, Hao; Chen, Diyi; Xu, Beibei; Patelli, Edoardo; Tolo, Silvia

    2018-02-01

    This paper analyzes the dynamic response of a pumped-storage hydropower plant in generating mode. Considering the elastic water column effects in the penstock, a linearized reduced order dynamic model of the pumped-storage hydropower plant is used in this paper. As the power load is always random, a set of random generator electric power output is introduced to research the dynamic behaviors of the pumped-storage hydropower plant. Then, the influences of the PI gains on the dynamic characteristics of the pumped-storage hydropower plant with the random power load are analyzed. In addition, the effects of initial power load and PI parameters on the stability of the pumped-storage hydropower plant are studied in depth. All of the above results will provide theoretical guidance for the study and analysis of the pumped-storage hydropower plant.

  18. Projects for small hydro-power installations in the Canton of Uri, Switzerland; Kanton Uri. Projekte fuer Kleinwasserkraftwerke - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    This report for the Swiss Federal Office of Energy (SFOE) on a preliminary study presents and discusses small-hydro projects at three locations in the Swiss Canton of Uri. Three of originally six potential locations were selected for further investigation. Factors such as the usable quantities of water available at the locations are discussed. The projects Brunnital, Gruonbach and Palanggenbach are discussed in detail. Water quantities and various components of the installations such as water intakes, de-sanding installations, pressure conduits, machine houses and tailrace channels are described, as is the electro-mechanical equipment proposed. Also, environmental aspects are dealt with. Annual electricity production and economic viability are further topics covered in the report.

  19. An investigation into the potential of low head hydro power in Northern Ireland for the production of electricity

    Science.gov (United States)

    Redpath, David; Ward, Michael J.

    2017-07-01

    The maximum exploitable potential for low head hydroelectric sites (gross head≤10 m) in Northern Ireland (NI) was determined as 12.07 MW using a simple payback analysis for 304 potential sites investigated to derive a classification scheme in terms of economic viability. A techno-economic analysis with validated numerical models from previous research estimated the capital investment required for the development of a hydroelectric plant, using the low head Michell-Banki cross flow turbine, for the 304 sites investigated. The number of potentially viable sites in NI for low head hydro ranged from 198 to 286 with an estimated installed capacity ranging from 11.95 to 12.05 MW. Sites with a limited installed capacity were not economically viable unless increased government support in the form of longer term (25-50 years) low interest loans as well as the current (Renewables Obligations Certificates) Renewables Obligation Certificates scheme is provided and sustained.

  20. Water Storage Instead of Energy Storage for Desalination Powered by Renewable Energy—King Island Case Study

    Directory of Open Access Journals (Sweden)

    Aya Tafech

    2016-10-01

    Full Text Available In this paper, we scrutinized the energy storage options used in mitigation of the intermittent nature of renewable energy resources for desalination process. In off-grid islands and remote areas, renewable energy is often combined with appropriate energy storage technologies (ESTs to provide a consistent and reliable electric power source. We demonstrated that in developing a renewable energy scheme for desalination purposes, product (water storage is a more reliable and techno-economic solution. For a King Island (Southeast Australia case-study, electric power production from renewable energy sources was sized under transient conditions to meet the dynamic demand of freshwater throughout the year. Among four proposed scenarios, we found the most economic option by sizing a 13 MW solar photovoltaic (PV field to instantly run a proportional RO desalination plant and generate immediate freshwater in diurnal times without the need for energy storage. The excess generated water was stored in 4 × 50 ML (mega liter storage tanks to meet the load in those solar deficit times. It was also demonstrated that integrating well-sized solar PV with wind power production shows more consistent energy/water profiles that harmonize the transient nature of energy sources with the water consumption dynamics, but that would have trivial economic penalties caused by larger desalination and water storage capacities.

  1. THE DETERMINATION OF THE BALLAST RESISTANCE USED FOR THE CONECTION TO AN EXPERIMENTAL STAND FOR THE STUDY OF THE HYDRO – WIND HYBRIYD POWER (CHHE

    Directory of Open Access Journals (Sweden)

    JOIAN R.

    2015-09-01

    Full Text Available This paper point out some of the experimental determinations that must be made in the achieving of a hidro - wind hybrid system. It highlights the design and implementation of a1 kW ballast resistor and 48 V nickel-chromium wire, with the diameter of 60 three millimeters and connecting cable at the wind turbine by electric panel. Thus, this experimental stand CHHE includes a wind turbine 1 kW, placed on the roof of the Technical University of Cluj Napoca (this place is favorable because the wind has high speeds at great height and hydro turbine type Pelton 1 kW power. The experimental stand for the study of CHHE hybrid energy system will allow the determination of more experimental conclusive on the impact of the achievement of an energy balance of the physical model.

  2. Ontario Hydro annual report 1975

    International Nuclear Information System (INIS)

    A financial report and statistics on Ontario energy demand are presented. Efforts to secure a reliable supply of coal and uranium are described. Ontario Hydro's expansion is now controlled by capital availability and not power demand, and this has affected 11 construction projects, including heavy water plants and nuclear generating stations. (E.C.B.)

  3. Forced-air, vacuum, and hydro precooling of cauliflower (Brassica oleracea L. var. botrytis cv. Freemont): Part II. Determination of quality parameters during storage

    OpenAIRE

    Alibas, Ilknur; Koksal, Nezihe

    2015-01-01

    Cauliflower heads, which were precooled using four different methods including vacuum, forced-air, and high and low flow hydro precooling, were stored under controlled atmosphere and room conditions. Controlled atmosphere conditions (CA) were as follows: 1°C temperature, 90 ± 5% relative humidity, and 0:21 [(%CO2:%O2) – (0:21) control] atmosphere composition. Room conditions (RC) were: 22±1°C temperature and 55-60% humidity. Various quality parameters of the cauliflo...

  4. Electric Machine Topologies in Energy Storage Systems

    OpenAIRE

    Santiago, Juan De; Oliveira, Janaina Goncalves de

    2010-01-01

    Energy storage development is essential if intermittent renewable energy generation is to increase. Pumped hydro, CAES and flywheels are environmentally friendly and economical storage alternatives that required electric motor/generators. The popularization of power electronics is relatively new and therefore the technology is still under development. There is not a clear winner when comparing technologies and therefore the optimal alternative depends on the specific requirements of the appli...

  5. Cost and performance analysis of concentrating solar power systems with integrated latent thermal energy storage

    International Nuclear Information System (INIS)

    Nithyanandam, K.; Pitchumani, R.

    2014-01-01

    Integrating TES (thermal energy storage) in a CSP (concentrating solar power) plant allows for continuous operation even during times when solar irradiation is not available, thus providing a reliable output to the grid. In the present study, the cost and performance models of an EPCM-TES (encapsulated phase change material thermal energy storage) system and HP-TES (latent thermal storage system with embedded heat pipes) are integrated with a CSP power tower system model utilizing Rankine and s-CO 2 (supercritical carbon-dioxide) power conversion cycles, to investigate the dynamic TES-integrated plant performance. The influence of design parameters of the storage system on the performance of a 200 MW e capacity power tower CSP plant is studied to establish design envelopes that satisfy the U.S. Department of Energy SunShot Initiative requirements, which include a round-trip annualized exergetic efficiency greater than 95%, storage cost less than $15/kWh t and LCE (levelized cost of electricity) less than 6 ¢/kWh. From the design windows, optimum designs of the storage system based on minimum LCE, maximum exergetic efficiency, and maximum capacity factor are reported and compared with the results of two-tank molten salt storage system. Overall, the study presents the first effort to construct and analyze LTES (latent thermal energy storage) integrated CSP plant performance that can help assess the impact, cost and performance of LTES systems on power generation from molten salt power tower CSP plant. - Highlights: • Presents technoeconomic analysis of thermal energy storage integrated concentrating solar power plants. • Presents a comparison of different storage options. • Presents optimum design of thermal energy storage system for steam Rankine and supercritical carbon dioxide cycles. • Presents designs for maximizing exergetic efficiency while minimizing storage cost and levelized cost of energy

  6. Development of compact rapid charging power supply for capacitive energy storage in pulsed power drivers.

    Science.gov (United States)

    Sharma, Surender Kumar; Shyam, Anurag

    2015-02-01

    High energy capacitor bank is used for primary electrical energy storage in pulsed power drivers. The capacitors used in these pulsed power drivers have low inductance, low internal resistance, and less dc life, so it has to be charged rapidly and immediately discharged into the load. A series resonant converter based 45 kV compact power supply is designed and developed for rapid charging of the capacitor bank with constant charging current up to 150 mA. It is short circuit proof, and zero current switching technique is used to commute the semiconductor switch. A high frequency resonant inverter switching at 10 kHz makes the overall size small and reduces the switching losses. The output current of the power supply is limited by constant on-time and variable frequency switching control technique. The power supply is tested by charging the 45 kV/1.67 μF and 15 kV/356 μF capacitor banks. It has charged the capacitor bank up to rated voltage with maximum charging current of 150 mA and the average charging rate of 3.4 kJ/s. The output current of the power supply is limited by reducing the switching frequency at 5 kHz, 3.3 kHz, and 1.7 kHz and tested with 45 kV/1.67 μF capacitor bank. The protection circuit is included in the power supply for over current, under voltage, and over temperature. The design details and the experimental testing results of the power supply for resonant current, output current, and voltage traces of the power supply with capacitive, resistive, and short circuited load are presented and discussed.

  7. A Hybrid Multilevel Storage Architecture for Electric Power Dispatching Big Data

    Science.gov (United States)

    Yan, Hu; Huang, Bibin; Hong, Bowen; Hu, Jing

    2017-10-01

    Electric power dispatching is the center of the whole power system. In the long run time, the power dispatching center has accumulated a large amount of data. These data are now stored in different power professional systems and form lots of information isolated islands. Integrating these data and do comprehensive analysis can greatly improve the intelligent level of power dispatching. In this paper, a hybrid multilevel storage architecture for electrical power dispatching big data is proposed. It introduces relational database and NoSQL database to establish a power grid panoramic data center, effectively meet power dispatching big data storage needs, including the unified storage of structured and unstructured data fast access of massive real-time data, data version management and so on. It can be solid foundation for follow-up depth analysis of power dispatching big data.

  8. Himalayan hydro on the horizon

    International Nuclear Information System (INIS)

    Sharp, Timothy

    2000-01-01

    The prospects for development of hydro in the Himalayas has been enhanced by privatisation and the urgent need for clean electricity in the north of India. There are various hurdles to be overcome before the projects are likely to move forward in earnest before 2005, and these are mentioned. The demand for electricity in India is said to be enormous. At present, there is much polluting industry along the Himalayas. As throughout the Indian privatisation dilemma, the critical issues for development of Himalayan hydro come down to credible commercial power markets and finance. With regard to finance and administrative changes, the Indian government is carrying out a number of actions and these are itemised. The US is vigorously promoting the development of Himalayan hydro as a key to much needed regional co-operation and the World Bank is supportive

  9. Power electronic interface circuits for batteries and ultracapacitors in electric vehicles and battery storage systems

    Science.gov (United States)

    King, Robert Dean; DeDoncker, Rik Wivina Anna Adelson

    1998-01-01

    A method and apparatus for load leveling of a battery in an electrical power system includes a power regulator coupled to transfer power between a load and a DC link, a battery coupled to the DC link through a first DC-to-DC converter and an auxiliary passive energy storage device coupled to the DC link through a second DC-to-DC converter. The battery is coupled to the passive energy storage device through a unidirectional conducting device whereby the battery can supply power to the DC link through each of the first and second converters when battery voltage exceeds voltage on the passive storage device. When the load comprises a motor capable of operating in a regenerative mode, the converters are adapted for transferring power to the battery and passive storage device. In this form, resistance can be coupled in circuit with the second DC-to-DC converter to dissipate excess regenerative power.

  10. Novel Control Strategy for Multiple Run-of-the-River Hydro Power Plants to Provide Grid Ancillary Services

    Energy Technology Data Exchange (ETDEWEB)

    Mohanpurkar, Manish; Luo, Yusheng; Hovsapian, Rob; Muljadi, Eduard; Gevorgian, Vahan; Koritarov, Vladimir

    2017-07-12

    Hydropower plant (HPP) generation comprises a considerable portion of bulk electricity generation and is delivered with a low-carbon footprint. In fact, HPP electricity generation provides the largest share from renewable energy resources, which include wind and solar. Increasing penetration levels of wind and solar lead to a lower inertia on the electric grid, which poses stability challenges. In recent years, breakthroughs in energy storage technologies have demonstrated the economic and technical feasibility of extensive deployments of renewable energy resources on electric grids. If integrated with scalable, multi-time-step energy storage so that the total output can be controlled, multiple run-of-the-river (ROR) HPPs can be deployed. Although the size of a single energy storage system is much smaller than that of a typical reservoir, the ratings of storages and multiple ROR HPPs approximately equal the rating of a large, conventional HPP. This paper proposes cohesively managing multiple sets of energy storage systems distributed in different locations. This paper also describes the challenges associated with ROR HPP system architecture and operation.

  11. PLZT Film Capacitors for Power Electronics and Energy Storage Applications

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Beihai; Hu, Zhongqiang; Koritala, Rachel E.; Lee, Tae H.; Dorris, Stephen E.; Balachandran, Uthamalingam

    2015-12-01

    Ceramic film capacitors with high dielectric constant and high breakdown strength hold special promise for applications demanding high power density. By means of chemical solution deposition, we deposited ≈2-μm-thick films of lanthanum-doped lead zirconate titanate (PLZT) on LaNiO3-buffered Ni (LNO/Ni) foils and platinized silicon (PtSi) substrates. The dielectric properties and energy storage performance of the resulting samples were determined under a high level of applied electric field. X-ray diffraction stress analysis revealed that PLZT on LNO/Ni bears a compressive stress of ≈370 MPa while PLZT on PtSi endures a tensile stress of ≈250 MPa. Compressive stress was found to lead to heightened polarization, improved tunability, increased irreversible domain wall motion, and enhanced breakdown strength for PLZT deposited on the LNO/Ni as compared with the PtSi substrate. We observed a tunability of ≈55 and ≈40 % at room temperature under 100 kV/cm applied field, remanent polarization of ≈23.5 and ≈7.4 µC/cm^2, coercive electric field of ≈25.6 and ≈21.1 kV/cm, and dielectric breakdown strength of ≈2.6 and ≈1.5 MV/cm for PLZT deposited on LNO/Ni foils and PtSi substrates, respectively. A high recoverable energy density of ≈85 J/cm^3 and energy conversion efficiency of ≈65 % were measured on the PLZT film grown on LNO/Ni.

  12. CFD research on runaway transient of pumped storage power station caused by pumping power failure

    International Nuclear Information System (INIS)

    Zhang, L G; Zhou, D Q

    2013-01-01

    To study runaway transient of pumped storage power station caused by pumping power failure, three dimensional unsteady numerical simulations were executed on geometrical model of the whole flow system. Through numerical calculation, the changeable flow configuration and variation law of some parameters such as unit rotate speed,flow rate and static pressure of measurement points were obtained and compared with experimental data. Numerical results show that runaway speed agrees well with experimental date and its error was 3.7%. The unit undergoes pump condition, brake condition, turbine condition and runaway condition with flow characteristic changing violently. In runaway condition, static pressure in passage pulses very strongly which frequency is related to runaway speed

  13. The potential for small-scale hydro power in Romania: a call for more co-ordinated governance

    Energy Technology Data Exchange (ETDEWEB)

    Luta, Alexandru

    2011-07-01

    Romania offers significant untapped resources for the development of small-scale hydro (SSH). The technology has been deployed before and is preserved. Projected increases in the demand for electricity coupled with the expected decommissioning of inefficient thermal capacity means that plenty of scope exists for adding capacity in Romania. It is questionable though whether the present lavish treatment of renewables is sustainable. The excessive burden placed on consumers given the likely policy overshoot raises questions about the sustainability of the Green Certificate scheme under the present form. Real hurdles about SSH projects persist in identifying sites, acquiring land and obtaining permits. The key hindrances to a more thorough expansion of SSH in Romania have to do with decision-making transparency, policy predictability and information diffusion. The erratic nature of Romanian renewables policy is directly connected to slow pace of the Romanian authorities in learning how to coordinate policy implementation between the local, central and European level in an effective manner. But given that that no fundamental regulatory transformation occur over the next year or two and that in that interval the issuance of permits and the acquisition of property is standardized, SSH may yet prove a fruitful line of business in Romania.(auth)

  14. Small-scale hydro-power plant in Anzonico - Preliminary project; Progetto microcentrale idroelettrica, Anzonico. Programma Centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-01-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant in the municipality of Anzonico, southern Switzerland. The water of a small alpine stream is to be used for power generation and vineyard irrigation as well as for the creation of an additional water resource for fire fighting in this sensitive region. The report is foreseen to support the request for a water usage concession to the authorities of the Canton of Ticino. It presents details on the hydrological data for the river and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as is the removal of river sediment. The electricity production expected is discussed, as is the economic viability of the project. Synergies exist with the local electricity utility that will renew and improve its power distribution and telecommunication system when the penstock will be mounted in the underground.

  15. Increased installation in existing hydro power plants. Potentials and costs; Oekt installasjon i eksisterende kraftverk. Potensial og kostnader

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, Kjell Erik (ed.)

    2011-06-15

    This report seeks to highlight the costs associated with increased installed capacity of existing hydropower plants. Five selected power plant is further studied. Furthermore, given an overview of the technical possibilities of power expansions in Norway. (AG)

  16. Coupled Large Scale Hydro-mechanical Modelling for cap-rock Failure Risk Assessment of CO2 Storage in Deep Saline Aquifers

    International Nuclear Information System (INIS)

    Rohmer, J.; Seyedi, D.M.

    2010-01-01

    This work presents a numerical strategy of large scale hydro-mechanical simulations to assess the risk of damage in cap-rock formations during a CO 2 injection process. The proposed methodology is based on the development of a sequential coupling between a multiphase fluid flow (TOUGH2) and a hydro-mechanical calculation code (Code-Aster) that enables us to perform coupled hydro-mechanical simulation at a regional scale. The likelihood of different cap-rock damage mechanisms can then be evaluated based on the results of the coupled simulations. A scenario based approach is proposed to take into account the effect of the uncertainty of model parameters on damage likelihood. The developed methodology is applied for the cap-rock failure analysis of deep aquifer of the Dogger formation in the context of the Paris basin multilayered geological system as a demonstration example. The simulation is carried out at a regional scale (100 km) considering an industrial mass injection rate of CO 2 of 10 Mt/y. The assessment of the stress state after 10 years of injection is conducted through the developed sequential coupling. Two failure mechanisms have been taken into account, namely the tensile fracturing and the shear slip reactivation of pre-existing fractures. To deal with the large uncertainties due to sparse data on the layer formations, a scenario based strategy is undertaken. It consists in defining a first reference modelling scenario considering the mean values of the hydro-mechanical properties for each layer. A sensitivity analysis is then carried out and shows the importance of both the initial stress state and the reservoir hydraulic properties on the cap-rock failure tendency. On this basis, a second scenario denoted 'critical' is defined so that the most influential model parameters are taken in their worst configuration. None of these failure criteria is activated for the considered conditions. At a phenomenological level, this study points out three key

  17. Competition policy and regulation in hydro-dominated electricity markets

    International Nuclear Information System (INIS)

    Rangel, Luiz Fernando

    2008-01-01

    This paper discusses the main competition issues that arise in electricity systems dominated by hydro generation, arguing that technological differences between hydro and thermal plants may allow hydropower producers to exert market power in different and subtler ways compared to thermal generators. The key for market power in hydro-based systems is the strategic allocation of a given amount of output across periods, rather than a straightforward reduction of total output. The paper examines the interaction between strategic hydro reservoir operation and transmission capacity constraints, and summarizes the implications of market power for system reliability. A review of recent relevant literature is included. Finally, possible interventions to mitigate market power are analysed

  18. Summary of State-of-the-Art Power Conversion Systems for Energy Storage Applications

    Energy Technology Data Exchange (ETDEWEB)

    Atcitty, S.; Gray-Fenner, A.; Ranade, S.

    1998-09-01

    The power conversion system (PCS) is a vital part of many energy storage systems. It serves as the interface between the storage device, an energy source, and an AC load. This report summarizes the results of an extensive study of state-of-the-art power conversion systems used for energy storage applications. The purpose of the study was to investigate the potential for cost reduction and performance improvement in these power conversion systems and to provide recommendations for fiture research and development. This report provides an overview of PCS technology, a description of several state-of-the-art power conversion systems and how they are used in specific applications, a summary of four basic configurations for l:he power conversion systems used in energy storage applications, a discussion of PCS costs and potential cost reductions, a summary of the stancku-ds and codes relevant to the technology, and recommendations for future research and development.

  19. Voltage regulated hybrid DC power source using supercapacitors as energy storage device

    International Nuclear Information System (INIS)

    Ayad, Mohamed-Yacine; Pierfederici, Serge; Rael, Stephane; Davat, Bernard

    2007-01-01

    The management of embedded electrical energy needs a storage system with high dynamic performances in order to shave transient power peaks and to compensate for the intrinsic limitations of the main source. The use of supercapacitors for this storage system is quite suitable because of appropriate electrical characteristics (huge capacitance, weak series resistance, high specific energy, high specific power), direct storage (energy ready for use) and easy control by power electronic conversion. This paper deals with the conception and realisation of a voltage regulated hybrid DC power source using supercapacitors as an auxiliary storage device. Here, we present the structure, control principle and results associated with experimental validation. Our interest will be focused on the management of transient power peaks

  20. Voltage regulated hybrid DC power source using supercapacitors as energy storage device

    Energy Technology Data Exchange (ETDEWEB)

    Ayad, Mohamed-Yacine; Pierfederici, Serge; Rael, Stephane; Davat, Bernard [Groupe de Recherche en Electrotechnique et Electronique de Nancy, Centre National de la Recherche Scientifique (Unite Mixte de Recherche 7037), 2, Avenue de la Foret de Haye, 54516 Vandoeuvre-les-Nancy (France)

    2007-07-15

    The management of embedded electrical energy needs a storage system with high dynamic performances in order to shave transient power peaks and to compensate for the intrinsic limitations of the main source. The use of supercapacitors for this storage system is quite suitable because of appropriate electrical characteristics (huge capacitance, weak series resistance, high specific energy, high specific power), direct storage (energy ready for use) and easy control by power electronic conversion. This paper deals with the conception and realisation of a voltage regulated hybrid DC power source using supercapacitors as an auxiliary storage device. Here, we present the structure, control principle and results associated with experimental validation. Our interest will be focused on the management of transient power peaks. (author)

  1. Contemporary energy storage sources. Energy saving

    International Nuclear Information System (INIS)

    Manev, Veselin

    2011-01-01

    The development of renewable energy system for electricity production is impede because of needs to be stabilized with nearly equivalent installed power of energy storage devices. The development of more electrical energy storage facilities will be extremely important for electricity generation in the future. Using hydro pumping, combined with a long life and fast charge/discharge rate, highly efficient contemporary power energy storage as Altairnano lithium ion battery, currently is seems to be the best solution for fast penetration rate of wind and solar energy systems

  2. Modeling storage and demand management in power distribution grids

    International Nuclear Information System (INIS)

    Schroeder, Andreas

    2011-01-01

    Grahical abstract: The model informs an optimal investment sizing decision as regards specific 'smart grid' applications such as storage facilities and meters enabling load control. Results indicate that central storage facilities are a more promising option for generation cost reductions as compared to demand management. Highlights: → Stochastic versus deterministic model increases investment efficiency up to 5%. → Deterministic model under-estimates value of load control and storage. → Battery storage is beneficial at investment cost below 850 EUR/MW h. → Demand management equipment is not beneficial at cost beyond 200 EUR. → The stylized 10 kV grid constitutes no shortage factor. -- Abstract: Storage devices and demand control may constitute beneficial tools to optimize electricity generation with a large share of intermittent resources through inter-temporal substitution of load. This paper quantifies the related cost reductions in a simulation model of a simplified stylized medium-voltage grid (10 kV) under uncertain demand and wind output. Benders Decomposition Method is applied to create a two-stage stochastic optimization program. The model informs an optimal investment sizing decision as regards specific 'smart' applications such as storage facilities and meters enabling load control. Model results indicate that central storage facilities are a more promising option for generation cost reductions as compared to demand management. Grid extensions are not appropriate in any of the scenarios. A sensitivity analysis is applied with respect to the market penetration of uncoordinated Plug-In Electric Vehicles which are found to strongly encourage investment into load control equipment for 'smart' charging and slightly improve the case for central storage devices.

  3. Hydro investment analysis under new market conditions

    Energy Technology Data Exchange (ETDEWEB)

    Doorman, Gerard

    2010-07-01

    Full text: A future energy system with stronger coupling to Europe and with an increased share of non-regulated renewables will lead to increasing variability of the demand faced by the hydro system. In a market based system these variations will be reflected by larger daily price variations, both in the Elspot day ahead market, the Elbas intraday market and in the balancing market. With its unique regulation capabilities, hydro power will be very well positioned to handle these variations. However, existing model concepts for long term hydro scheduling were not developed for this framework, and do not take the new market conditions into account to a sufficient degree. Therefore hydro scheduling tools used for upgrading and investment analysis as well as analysing consequences of new environmental demands need adaptation to a finer temporal resolution, and to perform optimisation under varying constraints and uncertain input data for inflow and electricity prices. Focus is on investment analysis for a river system or power producer. Existing models can be grouped in the long-term (scheduling models with a time horizon up to 5 years) EOPS (Vansimtap), EOPS-ST (SimtapEffekt) and ProdRisk, and the shortterm scheduling models with a typical time horizon up to a few weeks, but focus on 1-2 days (SHOP and ID-SIM). A perfect tool in the present context would combine the properties of the long term stochastic optimisation models with the modelling details of SHOP and/or ID-SIM. However, this is probably not possible and simplifications will be necessary. Some important deficiencies in the present long term models are: Insufficiently realistic plant models in the relevant optimization models; Time delays are not handled; Handing of flexible / state dependent constraints; Handling of ramping constraints; Modelling of the cost of frequent regulations (wear and tear); Reserve markets As a result of these deficiencies the investment analysis does not adequately assess the value

  4. International symposium on storage of spent fuel from power reactors. Book of extended synopses

    International Nuclear Information System (INIS)

    1998-11-01

    This book of extended synopses includes papers presented at the International Symposium on Storage of Spent Fuel from Power Reactors organized by IAEA and held in Vienna from 9 to 13 November 1998. It deals with the problems of spent fuel management being an outstanding stage in the nuclear fuel cycle, strategy of interim spent fuel storage, transportation and encapsulation of spent fuel elements from power reactors. Spent fuel storage facilities at reactor sites are always wet while spent fuel storage facilities away from reactor are either wet or dry including casks and vaults. Different design solutions and constructions of storage or transportation casks as well as storing facilities are presented, as well as status of spent fuel storage together with experiences achieved in a number of member states, in the frame of safety, licensing and regulating procedures

  5. International symposium on storage of spent fuel from power reactors. Book of extended synopses

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    This book of extended synopses includes papers presented at the International Symposium on Storage of Spent Fuel from Power Reactors organized by IAEA and held in Vienna from 9 to 13 November 1998. It deals with the problems of spent fuel management being an outstanding stage in the nuclear fuel cycle, strategy of interim spent fuel storage, transportation and encapsulation of spent fuel elements from power reactors. Spent fuel storage facilities at reactor sites are always wet while spent fuel storage facilities away from reactor are either wet or dry including casks and vaults. Different design solutions and constructions of storage or transportation casks as well as storing facilities are presented, as well as status of spent fuel storage together with experiences achieved in a number of member states, in the frame of safety, licensing and regulating procedures Refs, figs, tabs

  6. Home and away with Norwegian hydro

    International Nuclear Information System (INIS)

    Jones, Simon

    2000-01-01

    Evidence of Norway's position as a world leader in terms of design and construction of hydroelectric power plant, and its position as the biggest producer of hydro in Europe, is presented. There is still some 30 TWh of hydro available for development in Norway. Statkraft is the country's biggest hydro generator: it owns and operates 54 hydro plants and has shares in a further 30. Statkraft's research has shown that there is still a large market for renewables in Europe and believes that householders are prepared to pay a premium for green energy. Statkraft trades energy with Denmark and Sweden and is believed to be planning further growth overseas. The new millennium is set to bring major changes in Norway's power industry: Hafslund and Elkem have already agreed to merge to create the country's biggest privately-owned power group

  7. Wind power integration using individual heat pumps – Analysis of different heat storage options

    DEFF Research Database (Denmark)

    Hedegaard, Karsten; Mathiesen, Brian Vad; Lund, Henrik

    2012-01-01

    Significant installations of individual heat pumps are expected in future energy systems due to their economic competitiveness. This case study of the Danish energy system in 2020 with 50% wind power shows that individual heat pumps and heat storages can contribute to the integration of wind power....... Heat accumulation tanks and passive heat storage in the construction are investigated as two alternative storage options in terms of their ability to increase wind power utilisation and to provide cost-effective fuel savings. Results show that passive heat storage can enable equivalent to larger...... reductions in excess electricity production and fuel consumption than heat accumulation tanks. Moreover, passive heat storage is found to be significantly more cost-effective than heat accumulation tanks. In terms of reducing fuel consumption of the energy system, the installation of heat pumps is the most...

  8. 78 FR 15753 - Maintenance, Testing, and Replacement of Vented Lead-Acid Storage Batteries for Nuclear Power Plants

    Science.gov (United States)

    2013-03-12

    ...-Acid Storage Batteries for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft...-Acid Storage Batteries for Nuclear Power Plants.'' The draft guide describes methods that the NRC staff..., testing, and replacement of vented lead-acid storage batteries in nuclear power plants. DATES: Submit...

  9. Load following generation in nuclear power plants by latent thermal energy storage

    International Nuclear Information System (INIS)

    Abe, Yoshiyuki; Takahashi, Yoshio; Kamimoto, Masayuki; Sakamoto, Ryuji; Kanari, Katsuhiko; Ozawa, Takeo

    1985-01-01

    The recent increase in nuclear power plants and the growing difference between peak and off-peak demands imperatively need load following generation in nuclear power plants to meet the time-variant demands. One possible way to resolve the problem is, obviously, a prompt reaction conrol in the reactors. Alternatively, energy storage gives another sophisticated path to make load following generation in more effective manner. Latent thermal energy storage enjoys high storage density and allows thermal extraction at nearly constant temperature, i.e. phase change temperature. The present report is an attempt to evaluate the feasibility of load following electric power generation in nuclear plants (actually Pressurized Water Reactors) by latent thermal energy storage. In this concept, the excess thermal energy in the off-peak period is stored in molten salt latent thermal energy storage unit, and additional power output is generated in auxiliary generator in the peak demand duration using the stored thermal energy. The present evaluation gives encouraging results and shows the primary subject to be taken up at first is the compatibility of candidate storage materials with inexpensive structural metal materials. Chapter 1 denotes the background of the present report, and Chapter 2 reviews the previous studies on the peak load coverage by thermal energy storage. To figure out the concept of the storage systems, present power plant systems and possible constitution of storage systems are briefly shown in Chapter 3. The details of the evaluation of the candidate storage media, and the compilation of the materials' properties are presented in Chapter 4. In Chapter 5, the concept of the storage systems is depicted, and the economical feasibility of the systems is evaluated. The concluding remarks are summarized in Chapter 6. (author)

  10. Prospects for Large-Scale Energy Storage in Decarbonised Power Grids. Working Paper

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-12-21

    This report describes the development of a simplified algorithm to determine the amount of storage that compensates for short-term net variation of wind power supply and assesses its role in light of a changing future power supply mix. It also examines the range of options available to power generation and transmission operators to deal with variability.

  11. Final Report-- A Novel Storage Method for Concentrating Solar Power Plants Allowing Storage at High Temperature

    Energy Technology Data Exchange (ETDEWEB)

    Morris, Jeffrey F.

    2014-09-29

    The main objective of the proposed work was the development and testing of a storage method that has the potential to fundamentally change the solar thermal industry. The development of a mathematical model that describes the phenomena involved in the heat storage and recovery was also a main objective of this work. Therefore, the goal was to prepare a design package allowing reliable scale-up and optimization of design.

  12. The Nothuesli small hydro project

    International Nuclear Information System (INIS)

    Balachandran, S.; Jorde, K.

    2008-01-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  13. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  14. The 'Alte Ziegelei' small hydro-power installation in Derendingen, Switzerland; Kleinwasserkraftwerk alte Ziegelei in Derendingen. Programm Kleinwasserkraftwerke. Erfahrungs- und Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Koehli, T.

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) discusses the experience gained with a small hydro-power installation in Derendingen, Switzerland. This unique 'micro' installation uses an archimedian screw to produce 6.8 kW of power from a head of 1.15 m and a through-flow of 800 - 1000 litres per second. Optimisation of the project is discussed as are the effects of changing water levels above and below the screw. Winter operation is described and the mounting of gratings necessary to avoid the intake of debris is discussed. Fish-passes are looked at and the effort required for maintenance is compared with that for other types of installations. An accident that occurred is analysed and the results of energy-efficiency measurements made on the installation are presented. The report is rounded off with an evaluation of the plant's performance and a review of future work to be done.

  15. Pulsed modulator power supply for the g-2 muon storage ring injection kicker

    NARCIS (Netherlands)

    Mi, J.; Lee, Y. Y.; Morse, W. M.; Pai, C. I.; Pappas, G. C.; Sanders, R.; Semertzidis, Y. K.; Warburton, D.; Zapasek, R.; Jungmann, K.; Roberts, L.

    1999-01-01

    This paper describes the pulse modulator power supplies used to drive the kicker magnets that inject the muon beam into the g-2 storage ring that has been built at Brookhaven National Laboratory. Three modulators built into coaxial structures consisting of a series circuit of an energy storage

  16. Dynamic sizing of energy storage for hedging wind power forecast uncertainty

    DEFF Research Database (Denmark)

    Pinson, Pierre; Papefthymiou, George; Klöckl, Bernd

    2009-01-01

    In market conditions where program responsible parties are penalized for deviations from proposed bids, energy storage can be used for compensating the energy imbalances induced by limited predictability of wind power. The energy storage capacity necessary for performing this task will differ bet...

  17. Primary frequency regulation supported by battery storage systems in power systems dominated by renewable energy sources

    DEFF Research Database (Denmark)

    Turk, Ana; Sandelic, Monika; Noto, Giancarlo

    2018-01-01

    replaced by intermittent renewable generators. Therefore, maintaining system quality and stability in terms of power system frequency control is one of the major challenges that requires new resources and their system integration. Battery energy storage systems (BESS), as fast-acting energy storage systems...

  18. AN ASSESSMENT OF FLYWHEEL HIGH POWER ENERGY STORAGE TECHNOLOGY FOR HYBRID VEHICLES

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, James Gerald [ORNL

    2012-02-01

    An assessment has been conducted for the DOE Vehicle Technologies Program to determine the state of the art of advanced flywheel high power energy storage systems to meet hybrid vehicle needs for high power energy storage and energy/power management. Flywheel systems can be implemented with either an electrical or a mechanical powertrain. The assessment elaborates upon flywheel rotor design issues of stress, materials and aspect ratio. Twelve organizations that produce flywheel systems submitted specifications for flywheel energy storage systems to meet minimum energy and power requirements for both light-duty and heavy-duty hybrid applications of interest to DOE. The most extensive experience operating flywheel high power energy storage systems in heavy-duty and light-duty hybrid vehicles is in Europe. Recent advances in Europe in a number of vehicle racing venues and also in road car advanced evaluations are discussed. As a frame of reference, nominal weight and specific power for non-energy storage components of Toyota hybrid electric vehicles are summarized. The most effective utilization of flywheels is in providing high power while providing just enough energy storage to accomplish the power assist mission effectively. Flywheels are shown to meet or exceed the USABC power related goals (discharge power, regenerative power, specific power, power density, weight and volume) for HEV and EV batteries and ultracapacitors. The greatest technical challenge facing the developer of vehicular flywheel systems remains the issue of safety and containment. Flywheel safety issues must be addressed during the design and testing phases to ensure that production flywheel systems can be operated with adequately low risk.

  19. Carbon dioxide emissions effects of grid-scale electricity storage in a decarbonizing power system

    Science.gov (United States)

    Craig, Michael T.; Jaramillo, Paulina; Hodge, Bri-Mathias

    2018-01-01

    While grid-scale electricity storage (hereafter ‘storage’) could be crucial for deeply decarbonizing the electric power system, it would increase carbon dioxide (CO2) emissions in current systems across the United States. To better understand how storage transitions from increasing to decreasing system CO2 emissions, we quantify the effect of storage on operational CO2 emissions as a power system decarbonizes under a moderate and strong CO2 emission reduction target through 2045. Under each target, we compare the effect of storage on CO2 emissions when storage participates in only energy, only reserve, and energy and reserve markets. We conduct our study in the Electricity Reliability Council of Texas (ERCOT) system and use a capacity expansion model to forecast generator fleet changes and a unit commitment and economic dispatch model to quantify system CO2 emissions with and without storage. We find that storage would increase CO2 emissions in the current ERCOT system, but would decrease CO2 emissions in 2025 through 2045 under both decarbonization targets. Storage reduces CO2 emissions primarily by enabling gas-fired generation to displace coal-fired generation, but also by reducing wind and solar curtailment. We further find that the market in which storage participates drives large differences in the magnitude, but not the direction, of the effect of storage on CO2 emissions.

  20. A study of the status and future of superconducting magnetic energy storage in power systems

    International Nuclear Information System (INIS)

    Xue, X D; Cheng, K W E; Sutanto, D

    2006-01-01

    Superconducting magnetic energy storage (SMES) systems offering flexible, reliable, and fast acting power compensation are applicable to power systems to improve power system stabilities and to advance power qualities. The authors have summarized researches on SMES applications to power systems. Furthermore, various SMES applications to power systems have been described briefly and some crucial schematic diagrams and equations are given. In addition, this study presents valuable suggestions for future studies of SMES applications to power systems. Hence, this paper is helpful for co-researchers who want to know about the status of SMES applications to power systems. (topical review)

  1. Solar powered absorption cycle heat pump using phase change materials for energy storage

    Science.gov (United States)

    Middleton, R. L.

    1972-01-01

    Solar powered heating and cooling system with possible application to residential homes is described. Operating principles of system are defined and illustration of typical energy storage and exchange system is provided.

  2. Workshop on Hydrogen Storage and Generation for Medium-Power and -Energy Applications

    National Research Council Canada - National Science Library

    Matthews, Michael

    1998-01-01

    This report summarizes the Workshop on Hydrogen Storage and Generation Technologies for Medium-Power and -Energy Applications which was held on April 8-10, 1997 at the Radisson Hotel Orlando Airport in Orlando, Florida...

  3. Operation and sizing of energy storage for wind power plants in a market system

    International Nuclear Information System (INIS)

    Korpaas, M.; Holen, A.T.

    2003-01-01

    This paper presents a method for the scheduling and operation of energy storage for wind power plants in electricity markets. A dynamic programming algorithm is employed to determine the optimal energy exchange with the market for a specified scheduling period, taking into account transmission constraints. During operation, the energy storage is used to smooth variations in wind power production in order to follow the scheduling plan. The method is suitable for any type of energy storage and is also useful for other intermittent energy resources than wind. An application of the method to a case study is also presented, where the impact of energy storage sizing and wind forecasting accuracy on system operation and economics are emphasized. Simulation results show that energy storage makes it possible for owners of wind power plants to take advantage of variations in the spot price, by thus increasing the value of wind power in electricity markets. With present price estimates, energy storage devices such as reversible fuel cells are likely to be a more expensive alternative than grid expansions for the siting of wind farms in weak networks. However, for areas where grid expansions lead to unwanted interference with the local environment, energy storage should be considered as a reasonable way to increase the penetration of wind power. (author)

  4. Fishy Business: Response of Stream Fish Assemblages to Small Hydro-power Plant Induced Flow Alteration in the Western Ghats, Karnataka

    Science.gov (United States)

    Rao, S. T.; Krishnaswamy, J.; Bhalla, R. S.

    2017-12-01

    Alteration of natural flow regimes is considered as a major threat to freshwater fish assemblages as it disturbs the water quality and micro-habitat features of rivers. Small hydro-power (SHP), which is being promoted as a clean and green substitute for large hydro-power generation, alters the natural flow regime of head-water streams by flow diversion and regulation. The effects of altered flow regime on tropical stream fish assemblages, driven by seasonality induced perturbations to water quality and microhabitat parameters are largely understudied. My study examined the potential consequences of flow alteration by SHPs on fish assemblages in two tributaries of the west-flowing Yettinahole River which flows through the reserved forests of Sakleshpur in the Western Ghats of Karnataka. The flow in one of the tributaries followed natural flow regime while the other comprised three regimes: a near-natural flow regime above the dam, rapidly varying discharge below the dam and a dewatered regime caused by flow diversion. The study found that the altered flow regime differed from natural flow regime in terms of water quality, microhabitat heterogeneity and fish assemblage response, each indicative of the type of flow alteration. Fish assemblage in the natural flow regime was characterized by a higher catch per site, a strong association of endemic and trophic specialist species. The flow regime above the dam was found to mimic some components of the natural flow regime, both ecological and environmental. Non endemic, generalist and pool tolerant species were associated with the dewatered regime. There was a lack of strong species-regime association and an overall low catch per site for the flow regulated regime below the dam. This study highlights the consequences of altered flows on the composition of freshwater fish assemblages and portrays the potential of freshwater fish as indicators of the degree and extent of flow alteration. The study recommends the need for

  5. Battery storage for PV power systems: an overview

    Energy Technology Data Exchange (ETDEWEB)

    Chaurey, A; Deambi, S [Tata Energy Research Inst., New Delhi (India)

    1992-06-01

    Batteries used in photovoltaic applications are required to have particular properties in order to minimize the system cost, in addition to meeting stringent reliability requirements associated with PV system installations. The battery sizing, installations, operation and maintenance, thus, are fundamentally different from those used in several other energy storage applications. The current paper gives an overview of battery systems commonly used in PV installation, as well as several new options which are found suitable or have been modified suitably to meet PV energy storage requirements. The systems are discussed briefly with respect to their construction, performance characteristics and compatibility with PV systems. The battery sizing procedures are also reviewed. (Author).

  6. Novel Thermal Storage Technologies for Concentrating Solar Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Neti, Sudhakar [Lehigh Univ., Bethlehem, PA (United States). Mechanical Engineering and Mechanics; Oztekin, Alparslan [Lehigh Univ., Bethlehem, PA (United States); Chen, John [Lehigh Univ., Bethlehem, PA (United States); Tuzla, Kemal [Lehigh Univ., Bethlehem, PA (United States); Misiolek, Wojciech [Lehigh Univ., Bethlehem, PA (United States)

    2013-06-20

    The technologies that are to be developed in this work will enable storage of thermal energy in 100 MWe solar energy plants for 6-24 hours at temperatures around 300°C and 850°C using encapsulated phase change materials (EPCM). Several encapsulated phase change materials have been identified, fabricated and proven with calorimetry. Two of these materials have been tested in an airflow experiment. A cost analysis for these thermal energy storage systems has also been conducted that met the targets established at the initiation of the project.

  7. Equivalent Method of Integrated Power Generation System of Wind, Photovoltaic and Energy Storage in Power Flow Calculation and Transient Simulation

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    The integrated power generation system of wind, photovoltaic (PV) and energy storage is composed of several wind turbines, PV units and energy storage units. The detailed model of integrated generation is not suitable for the large-scale powe.r system simulation because of the model's complexity and long computation time. An equivalent method for power flow calculation and transient simulation of the integrated generation system is proposed based on actual projects, so as to establish the foundation of such integrated system simulation and analysis.

  8. Retrofitting a Geothermal Plant with Solar and Storage to Increase Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Guangdong [National Renewable Energy Laboratory (NREL), Golden, CO (United States); McTigue, Joshua Dominic P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Turchi, Craig S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Castro, Jose [Coso Operating Co.; Mungas, Greg [Hyperlight Energy; Kramer, Nick [Hyperlight Energy; King, John [Hyperlight Energy

    2017-10-04

    Solar hybridization using concentrating solar power (CSP) can be an effective approach to augment the power generation and power cycle efficiency of a geothermal power plant with a declining resource. Thermal storage can further increase the dispatchability of a geothermal/solar hybrid system, which is particularly valued for a national grid with high renewable penetration. In this paper, a hybrid plant design with thermal storage is proposed based on the requirements of the Coso geothermal field in China Lake, California. The objective is to increase the power production by 4 MWe. In this system, a portion of the injection brine is recirculated through a heat exchanger with the solar heat transfer fluid, before being mixed with the production well brine. In the solar heating loop the brine should be heated to at least 155 degrees C to increase the net power. The solar field and storage were sized based on solar data for China Lake. Thermal storage is used to store excess power at the high-solar-irradiation hours and generate additional power during the evenings. The solar field size, the type and capacity of thermal storage and the operating temperatures are critical factors in determining the most economic hybrid system. Further investigations are required to optimize the hybrid system and evaluate its economic feasibility.

  9. Optimal wind-hydro solution for the Marmara region of Turkey to meet electricity demand

    International Nuclear Information System (INIS)

    Dursun, Bahtiyar; Alboyaci, Bora; Gokcol, Cihan

    2011-01-01

    Wind power technology is now a reliable electricity production system. It presents an economically attractive solution for the continuously increasing energy demand of the Marmara region located in Turkey. However, the stochastic behavior of wind speed in the Marmara region can lead to significant disharmony between wind energy production and electricity demand. Therefore, to overcome wind's variable nature, a more reliable solution would be to integrate hydropower with wind energy. In this study, a methodology to estimate an optimal wind-hydro solution is developed and it is subsequently applied to six typical different site cases in the Marmara region in order to define the most beneficial configuration of the wind-hydro system. All numerical calculations are based on the long-term wind speed measurements, electrical load demand and operational characteristics of the system components. -- Research highlights: → This study is the first application of a wind-hydro pumped storage system in Turkey. → The methodology developed in this study is applied to the six sites in the Marmara region of Turkey. A wind - hydro pumped storage system is proposed to meet the electric energy demand of the Marmara region.

  10. Optimal sizing and control strategy of isolated grid with wind power and energy storage system

    International Nuclear Information System (INIS)

    Luo, Yi; Shi, Lin; Tu, Guangyu

    2014-01-01

    Highlights: • An energy storage sizing scheme for wind powered isolated grid is developed. • A bi-level control strategy for wind-battery isolated grid is proposed. • The energy storage type selection method for Nan’ao island grid is presented. • The sizing method and the control strategy are verified based on the Nan’ao island. • The wind-battery demonstration system has great benefit for remote areas. - Abstract: Integrating renewable energy and energy storage system provides a prospective way for power supply of remote areas. Focused on the isolated grids comprising renewable energy generation and energy storage, an energy storage sizing method for taking account of the reliability requirement and a bi-level control strategy of the isolated grids are presented in this paper. Based on comparative analysis of current energy storage characteristics and practicability, Sodium–sulfur battery is recommended for power balance control in the isolated grids. The optimal size of the energy storage system is determined by genetic algorithm and sequential simulation. The annualized cost considering the compensation cost of curtailed wind power and load is minimized when the reliability requirement can be satisfied. The sizing method emphasizes the tradeoff between energy storage size and reliability of power supply. The bi-level control strategy is designed as upper level wide area power balance control in dispatch timescale and lower level battery energy storage system V/f control in real-time range for isolated operation. The mixed timescale simulation results of Nan’ao Island grid verify the effectiveness of the proposed sizing method and control strategy

  11. Final Generic Environmental Impact Statement. Handling and storage of spent light water power reactor fuel. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1979-08-01

    This volume contains the following appendices: LWR fuel cycle, handling and storage of spent fuel, termination case considerations (use of coal-fired power plants to replace nuclear plants), increasing fuel storage capacity, spent fuel transshipment, spent fuel generation and storage data, characteristics of nuclear fuel, away-from-reactor storage concept, spent fuel storage requirements for higher projected nuclear generating capacity, and physical protection requirements and hypothetical sabotage events in a spent fuel storage facility

  12. Electricity Storage. Technology Brief

    Energy Technology Data Exchange (ETDEWEB)

    Simbolotti, G. [Italian National Agency for New Technologies, Energy and Sustainable Economic Development ENEA, Rome (Italy); Kempener, R. [International Renewable Energy Agency IRENA, Bonn (Germany)

    2012-04-15

    Electricity storage is a key technology for electricity systems with a high share of renewables as it allows electricity to be generated when renewable sources (i.e. wind, sunlight) are available and to be consumed on demand. It is expected that the increasing price of fossil fuels and peak-load electricity and the growing share of renewables will result in electricity storage to grow rapidly and become more cost effective. However, electricity storage is technically challenging because electricity can only be stored after conversion into other forms of energy, and this involves expensive equipment and energy losses. At present, the only commercial storage option is pumped hydro power where surplus electricity (e.g. electricity produced overnight by base-load coal or nuclear power) is used to pump water from a lower to an upper reservoir. The stored energy is then used to produce hydropower during daily high-demand periods. Pumped hydro plants are large-scale storage systems with a typical efficiency between 70% and 80%, which means that a quarter of the energy is lost in the process. Other storage technologies with different characteristics (i.e. storage process and capacity, conversion back to electricity and response to power demand, energy losses and costs) are currently in demonstration or pre-commercial stages and discussed in this brief report: Compressed air energy storage (CAES) systems, Flywheels; Electrical batteries; Supercapacitors; Superconducting magnetic storage; and Thermal energy storage. No single electricity storage technology scores high in all dimensions. The technology of choice often depends on the size of the system, the specific service, the electricity sources and the marginal cost of peak electricity. Pumped hydro currently accounts for 95% of the global storage capacity and still offers a considerable expansion potential but does not suit residential or small-size applications. CAES expansion is limited due to the lack of suitable

  13. Outlook and application analysis of energy storage in power system with high renewable energy penetration

    Science.gov (United States)

    Feng, Junshu; Zhang, Fuqiang

    2018-02-01

    To realize low-emission and low-carbon energy production and consumption, large-scale development and utilization of renewable energy has been put into practice in China. And it has been recognized that power system of future high renewable energy shares can operate more reliably with the participation of energy storage. Considering the significant role of storage playing in the future power system, this paper focuses on the application of energy storage with high renewable energy penetration. Firstly, two application modes are given, including demand side application mode and centralized renewable energy farm application mode. Afterwards, a high renewable energy penetration scenario of northwest region in China is designed, and its production simulation with application of energy storage in 2050 has been calculated and analysed. Finally, a development path and outlook of energy storage is given.

  14. Conceptual design of an interim dry storage system for the Atucha nuclear power plant spent fuels

    International Nuclear Information System (INIS)

    Nassini, Horacio E.P.; Fuenzalida Troyano, C.S.; Bevilacqua, Arturo M.; Bergallo, Juan E.

    2005-01-01

    The Atucha I nuclear power station, after completing the rearrangement and consolidation of the spent fuels in the two existing interim wet storage pools, will have enough room for the storage of spent fuel from the operation of the reactor till December 2014. If the operation is extended beyond 2014, or if the reactor is decommissioned, it will be necessary to empty both pools and to transfer the spent fuels to a dry storage facility. This paper shows the progress achieved in the conceptual design of a dry storage system for Atucha I spent fuels, which also has to be adequate, without modifications, for the storage of fuels from the second unity of the nuclear power station, Atucha II, that is now under construction. (author) [es

  15. Sizing Hydrogen Energy Storage in Consideration of Demand Response in Highly Renewable Generation Power Systems

    Directory of Open Access Journals (Sweden)

    Mubbashir Ali

    2018-05-01

    Full Text Available From an environment perspective, the increased penetration of wind and solar generation in power systems is remarkable. However, as the intermittent renewable generation briskly grows, electrical grids are experiencing significant discrepancies between supply and demand as a result of limited system flexibility. This paper investigates the optimal sizing and control of the hydrogen energy storage system for increased utilization of renewable generation. Using a Finnish case study, a mathematical model is presented to investigate the optimal storage capacity in a renewable power system. In addition, the impact of demand response for domestic storage space heating in terms of the optimal sizing of energy storage is discussed. Finally, sensitivity analyses are conducted to observe the impact of a small share of controllable baseload production as well as the oversizing of renewable generation in terms of required hydrogen storage size.

  16. Minimizing Wind Power Producer's Balancing Costs Using Electrochemical Energy Storage: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Miettinen, J.; Tikka, V.; Lassila, J.; Partanen, J.; Hodge, B. M.

    2014-08-01

    This paper examines how electrochemical energy storage can be used to decrease the balancing costs of a wind power producer in the Nordic market. Because electrochemical energy storage is developing in both technological and financial terms, a sensitivity analysis was carried out for the most important variables in the wind-storage hybrid system. The system was studied from a wind power producer's point of view. The main result is that there are no technical limitations to using storage for reducing the balancing costs. However, in terms of economic feasibility, installing hybrid wind-storage systems such as the one studied in this paper faces challenges in both the short and long terms.

  17. Power-to-heat in adiabatic compressed air energy storage power plants for cost reduction and increased flexibility

    Science.gov (United States)

    Dreißigacker, Volker

    2018-04-01

    The development of new technologies for large-scale electricity storage is a key element in future flexible electricity transmission systems. Electricity storage in adiabatic compressed air energy storage (A-CAES) power plants offers the prospect of making a substantial contribution to reach this goal. This concept allows efficient, local zero-emission electricity storage on the basis of compressed air in underground caverns. The compression and expansion of air in turbomachinery help to balance power generation peaks that are not demand-driven on the one hand and consumption-induced load peaks on the other. For further improvements in cost efficiencies and flexibility, system modifications are necessary. Therefore, a novel concept regarding the integration of an electrical heating component is investigated. This modification allows increased power plant flexibilities and decreasing component sizes due to the generated high temperature heat with simultaneously decreasing total round trip efficiencies. For an exemplarily A-CAES case simulation studies regarding the electrical heating power and thermal energy storage sizes were conducted to identify the potentials in cost reduction of the central power plant components and the loss in round trip efficiency.

  18. Detailed partial load investigation of a thermal energy storage concept for solar thermal power plants with direct steam generation

    Science.gov (United States)

    Seitz, M.; Hübner, S.; Johnson, M.

    2016-05-01

    Direct steam generation enables the implementation of a higher steam temperature for parabolic trough concentrated solar power plants. This leads to much better cycle efficiencies and lower electricity generating costs. For a flexible and more economic operation of such a power plant, it is necessary to develop thermal energy storage systems for the extension of the production time of the power plant. In the case of steam as the heat transfer fluid, it is important to use a storage material that uses latent heat for the storage process. This leads to a minimum of exergy losses during the storage process. In the case of a concentrating solar power plant, superheated steam is needed during the discharging process. This steam cannot be superheated by the latent heat storage system. Therefore, a sensible molten salt storage system is used for this task. In contrast to the state-of-the-art thermal energy storages within the concentrating solar power area of application, a storage system for a direct steam generation plant consists of a latent and a sensible storage part. Thus far, no partial load behaviors of sensible and latent heat storage systems have been analyzed in detail. In this work, an optimized fin structure was developed in order to minimize the costs of the latent heat storage. A complete system simulation of the power plant process, including the solar field, power block and sensible and latent heat energy storage calculates the interaction between the solar field, the power block and the thermal energy storage system.

  19. Application of superconducting magnet energy storage to improve power system dynamic performance

    International Nuclear Information System (INIS)

    Mitani, Y.; Tsuji, K.; Murakami, Y.

    1988-01-01

    The application of Superconducting Magnet Energy Storage (SMES) to the stabilization of a power system with long distance bulk power transmission lines which has the problem of poorly damped power oscillations, is presented. Control schemes for stabilization using SMES which is capable of controlling active and reactive power simultaneously in four quadrant ranges, is proposed. The effective locations and the necessary capacities of SMES for power system stabilizing control are discussed in detail. Results of numerical analysis and experiments in an artificial power transmission system demonstrate the significant effect of the control by SMES on the improvement of power system oscillatory performance

  20. Hydro-mechanical processes

    Energy Technology Data Exchange (ETDEWEB)

    Laouafa, F.; Kazmierczak, J.B. [Institut National de l' Environnement Industriel et des Risques (INERIS), Parc Technologique ALATA, 60 - Verneuil en Halatte (France); Armand, G. [Agence Nationale pour la Gestion des Dechets Radioactifs, Lab. de Souterrain de Meuse/Haute-Marne, 55 - Bure (France); Vaunat, J. [Catalonia UPC- Technical Univ., Barcelona (Spain); Jobmann, M.; Polster, M. [DBETEC- DBE Technology GmbH, Peine (Germany); Su, K.; Lebon, P.; Plas, F.; Armand, G.; Abou-Chakra Guery, A.; Cormery, F.; Shao, J.F.; Kondo, D. [ANDRA - Agence Nationale pour la Gestion des Dechets Radioactifs, 92 - Chatenay Malabry (France); Souley, M. [Institut National de l' Environnement Industriel et des Risques (INERIS), 54 - Nancy (France); Coll, C.; Charlier, R.; Collin, F.; Gerard, P. [Liege Univ., Dept. ArGEnCo (Belgium); Xiang Ling, Li [ESV EURIDICE, SCK.CEN, Belgian Nuclear Research Centre, Mol (Belgium); Collin, F. [Liege Univ., Charge de Recherches FNRS (Belgium); Pellet, F.L.; Fabre, G. [University Joseph Fourier, Laboratory 3S-R, 38 - Grenoble (France); Garcia-Sineriz, J.L.; Rey, M. [AITEMIN - Asociacion para la Investigacion y Desarrollo Industrial de los Recursos Naturales, Madrid (Spain); Mayor, J.C. [ENRESA - Empresa Nacional des Residuos Radioactivos, Madrid (Spain); Castellanos, E.; Romero, E.; Lloret, A.; Gens, A. [Catalunya Univ. Politecnica, UPC (Spain); Villar, M.V. [CIEMAT - Centro de Investigaciones Energeticas, Medioambientales y Tecnologicas, Madrid (Spain); Chambon, R. [Laboratoire 3S, UJF-INPG-CNRS, 38 - Grenoble (France); Czaikowski, O.; Lux, K.H. [Clausthal Univ. of Technology, Professorship for Waste Disposal and Geomechanics, Clausthal-Zellerfeld (Germany); Van Geet, M.; Bastiaens, W.; Volckaert, G.; Weetjens, E.; Sillen, X. [SCK-CEN, Waste and Disposal dept., Mol (Belgium); ONDRAF/NIRAS, Brussel (Belgium); Imbert, Ch. [CEA Saclay, Dept. de Physico-Chimie (DPC/SCCME/LECBA), 91 - Gif sur Yvette (France)] [and others

    2007-07-01

    This session gathers 13 articles dealing with: three-dimensional and time stepping modelling of the whole Meuse/Haute-Marne ANDRA URL (F. Laouafa, J.B. Kazmierczak, G. Armand, J. Vaunat, M. Jobmann, M. Polster); a constitutive model for a deep argillaceous rock using Hoek-Brown criteria (K. Su, C. Chavant, M. Souley); the long term behaviour of the Boom clay: influence of viscosity on the pore pressure distribution (C. Coll, R. Charlier, X.L. Li, F. Collin); the microstructural changes induced by viscoplastic deformations in argillaceous rocks (F.L. Pellet, G. Fabre, K. Su, P. Lebon); the engineered barrier experiment at Mont Terri rock laboratory (J.L. Garcia-Sineriz, M. Rey, J.C. Mayor); the chemical influence on the Hydro-Mechanical behaviour of high-density FEBEX bentonite (E. Castellanos, M.V. Villar, E. Romero, A. Lloret, A. Gens); the influence of water exchanges on the gallery convergence (P. Gerard, R. Charlier, R. Chambon, F. Collin); a new method for ageing resistant storage of argillaceous rock samples to achieve reproducible experimental results even after long intermediate storage times (O. Czaikowski, K.H. Lux); the installation and evaluation of a large-scale in-situ shaft seal experiment in Boom clay the RESEAL project M. Van Geet, W. Bastiaens, G. Volckaert, E. Weetjens, X. Sillen, A. Gens, M.V. Villar, Ch. Imbert, M. Filippi, F. Plas); the hydro-Mechanical response of the Callovo-Oxfordian mud-stone around a deep vertical drift (J. Vaunat, B. Garitte, A. Gens, K. Su, G. Armand); the sensitivity of total stress to changes in externally applied water pressure in KBS-3 buffer bentonite (J.F. Harrington, D.J. Birchall, P. Sellin); the comparison of the poro-elastic behavior of Meuse/Haute Marne and Tournemire argillites: effect of loading and saturation states (E. Bemer, A. Noiret, F. Homand, A. Rejeb); and the multi-scale modelling of the argillites mechanical behaviour (A. Abou-Chakra Guery, F. Cormery, K. Su, J.F. Shao, D. Kondo)

  1. A Method of Dynamic Extended Reactive Power Optimization in Distribution Network Containing Photovoltaic-Storage System

    Science.gov (United States)

    Wang, Wu; Huang, Wei; Zhang, Yongjun

    2018-03-01

    The grid-integration of Photovoltaic-Storage System brings some undefined factors to the network. In order to make full use of the adjusting ability of Photovoltaic-Storage System (PSS), this paper puts forward a reactive power optimization model, which are used to construct the objective function based on power loss and the device adjusting cost, including energy storage adjusting cost. By using Cataclysmic Genetic Algorithm to solve this optimization problem, and comparing with other optimization method, the result proved that: the method of dynamic extended reactive power optimization this article puts forward, can enhance the effect of reactive power optimization, including reducing power loss and device adjusting cost, meanwhile, it gives consideration to the safety of voltage.

  2. Microgrid Control Strategy Utlizing Thermal Energy Storage With Renewable Solar And Wind Power Generation

    Science.gov (United States)

    2016-06-01

    iii Approved for public release; distribution is unlimited MICROGRID CONTROL STRATEGY UTLIZING THERMAL ENERGY STORAGE WITH RENEWABLE SOLAR AND WIND... control tracks increasing power generation in the morning. The batteries require a large amount of electrical power to charge every morning, as charge ...is 37 lost throughout the night. This causes the solar panels to output their maximum power generation. The MPPT control records when power

  3. Energy Storage Requirements for PV Power Ramp Rate Control in Northern Europe

    Directory of Open Access Journals (Sweden)

    Julius Schnabel

    2016-01-01

    Full Text Available Photovoltaic (PV generators suffer from fluctuating output power due to the highly fluctuating primary energy source. With significant PV penetration, these fluctuations can lead to power system instability and power quality problems. The use of energy storage systems as fluctuation compensators has been proposed as means to mitigate these problems. In this paper, the behavior of PV power fluctuations in Northern European climatic conditions and requirements for sizing the energy storage systems to compensate them have been investigated and compared to similar studies done in Southern European climate. These investigations have been performed through simulations that utilize measurements from the Tampere University of Technology solar PV power station research plant in Finland. An enhanced energy storage charging control strategy has been developed and tested. Energy storage capacity, power, and cycling requirements have been derived for different PV generator sizes and power ramp rate requirements. The developed control strategy leads to lesser performance requirements for the energy storage systems compared to the methods presented earlier. Further, some differences on the operation of PV generators in Northern and Southern European climates have been detected.

  4. Ecological improvements in conjunction with the new RADAG hydro power plant; Oekologische Aufwertungsmassnahmen beim Neubau des Wehrkraftwerks der RADAG

    Energy Technology Data Exchange (ETDEWEB)

    Ruess, Beatrice [RUS AG, Baden (Switzerland)

    2010-07-01

    Together the weir power plant and the upgrading measures will create salient ecological improvements of the actual conditions of the residual water route. Of special importance are the increased runoff into the Old Rhine and the additional structuring measures. The natural evasion waters combined with the Collection Gallery and the Vertical Slot fish ladder together with the new fish ladder at the Main Power Station will on one hand greatly improve the longitudinal continuum and on the other hand create habitats for species relying on strong-flowing waters. (orig.)

  5. Ontario Hydro's plan for used nuclear fuel

    International Nuclear Information System (INIS)

    Stevens-Guille, P.D.; Howes, H.A.; Freire-Canosa, J.

    1992-01-01

    A comprehensive plan for the management of used nuclear fuel has been published by Ontario Hydro. In this paper current practices are discussed and actions leading to disposal in a repository are outlined. Extended storage options are discussed should disposal be delayed

  6. Spent fuel storage rack for atomic power plant

    International Nuclear Information System (INIS)

    Kodama, Tatemitsu.

    1981-01-01

    Purpose: To flexibly cope with the changes in the size and shape of spent fuel storage containers by placing a number of independently-constructed rack cells in a rack frame in such a manner that the guide support members of the storage rack, mounted on each rack cell may be replaced. Constitution: Independently-constructed rack cells are inserted from above into a rack frame rigidly installed on the bottom of a water pool. Each cell is produced by welding, has a handling head mounted at the top, and guide support members made of three replaceable guide tubes are mounted with bolts. If the size and the shape of the containers are altered, this configuration can easily cope with the new container shape by merely having the guide tubes replaced, without adversely affecting other cells and without necessitating draining of the water in the pool. (Yoshino, Y.)

  7. Estimation of energy storage capacity in power system in japan under future demand and supply factors

    International Nuclear Information System (INIS)

    Kurihara, Ikuo; Tanaka, Toshikatsu

    1996-01-01

    The desirable capacity of future energy storage facility in power system in Japan is discussed in this paper, putting emphasis on future new electric demand/supply factors such as CO 2 emission problems and social structure change. The two fundamental demand scenarios are considered; one is base case scenario which extrapolates the trend until now and the other is social structure change scenario. The desirable capacity of the energy storage facility is obtained from the result of optimum generation mix which minimizes the yearly expenses of the target year (2030 and 2050). The result shows that the optimum capacity of energy storage facility is about 10 to 15%. The social structure change and demand side energy storage have great influences on the optimum capacity of supply side storage. The former increases storage capacity. The latter reduces it and also contributes to the reduction of generation cost. Suppression of CO 2 emission basically affects to reduce the storage capacity. The load following operation of nuclear plant also reduces the optimum storage capacity in the case it produces surplus energy at night. Though there exist many factors which increase or decrease the capacity of energy storage facility, as a whole, it is concluded that the development of new energy storage technology is necessary for future. (author)

  8. Ontario Hydro Research Division, 1980

    International Nuclear Information System (INIS)

    The work of the Research Division of Ontario Hydro provides technical and scientific support for the engineering and operation of a power system that includes hydraulic, fossil-fired, and nuclear generation. It also relates to the transmission and distribution of electricity and to the need to help customers use electricity with safety and economy. Among the examples of projects given are qualification of CANDU heat transport system components, pressure tube replacement, steam generator integrity, testing for earthquake resistance, and radioactive waste disposal

  9. Management and ultimate storage of wastes from nuclear power generation

    International Nuclear Information System (INIS)

    1989-09-01

    The annotation on R and D prorgam 86 parts I-II have been brought together in the present report part I, together with some general viewpoints, and been classified according to subject. Part II of the present report comprises viewpoints of 'Research Program 1987-1992' and part III of 'Alternative methods of ultimate storage'. Swedish and French viewpoints are presented in Swedish, the remaining foreign material in English. The comments are grouped in subject catergories. (O.S.)

  10. The effects of new diversion valves in Alta hydro-power station on the population of Atlantic salmon

    International Nuclear Information System (INIS)

    Forseth, Torbjoern; Naesje, Tor F.; Jensen, Arne J.; Saksgaard, Laila; Hvidsten, Nils Arne

    1997-02-01

    The report deals with consequential relations for the environment of Alta river in Northern Norway in connection with a hydroelectric power plant. The consequences of regulating the flow by the installation of an new diversion valve are discussed. 39 refs., 10 figs., 4 tabs

  11. MODELING AND STUDY OF HYDROELECTRIC GENERATING SETS OF SMALL HYDRO POWER PLANTS WITH FREQUENCY-CONTROLLED PERMANENT MAGNET SYNCHRONOUS GENERATORS

    Directory of Open Access Journals (Sweden)

    R. I. Mustafayev

    2016-01-01

    Full Text Available Currently, the hydroelectric generating sets of small HPPs with Pelton turbines employ as their generating units conventional synchronous generators with electromagnetic excitation. To deal with the torque pulsatile behaviour, they generally install a supplementary flywheel on the system shaft that levels the pulsations. The Pelton turbine power output is adjusted by the needle changing water flow in the nozzle, whose advancement modifies the nozzle area and eventually – the flow. They limit the needle full stroke time to 20–40 sec. since quick shutting the nozzle for swift water flow reduction may result in pressure surges. For quick power adjustment so-called deflectors are employed, whose task is retraction of water jets from the Pelton turbine buckets. Thus, the mechanical method of power output regulation requires agreement between the needle stroke inside the turbine nozzles and the deflector. The paper offers employing frequency-controlled synchronous machines with permanent magnets qua generating units for the hydroelectric generating sets of small HPPs with Pelton turbines. The developed computer model reveals that this provides a higher level of adjustability towards rapid-changing loads in the grid. Furthermore, this will replace the power output mechanical control involving the valuable deflector drive and the turbine nozzle needles with electrical revolution rate and power output regulation by a frequency converter located in the generator stator circuit. Via frequency start, the controllable synchronous machine ensures stable operation of the hydroelectric generating set with negligibly small amount of water (energy carrier. Finally, in complete absence of water, the frequency-relay start facilitates shifting the generator operation to the synchronous capacitor mode, which the system operating parameter fluctograms obtained through computer modeling prove. 

  12. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  13. Vestas Power Plant Solutions Integrating Wind, Solar PV and Energy Storage

    DEFF Research Database (Denmark)

    Petersen, Lennart; Hesselbæk, Bo; Martinez, Antonio

    2018-01-01

    This paper addresses a value proposition and feasible system topologies for hybrid power plant solutions integrating wind, solar PV and energy storage and moreover provides insights into Vestas hybrid power plant projects. Seen from the perspective of a wind power plant developer, these hybrid...... solutions provide a number of benefits that could potentially reduce the Levelized Cost of Energy and enable entrance to new markets for wind power and facilitate the transition to a more sustainable energy mix. First, various system topologies are described in order to distinguish the generic concepts...... for the electrical infrastructure of hybrid power plants. Subsequently, the benefits of combining wind and solar PV power as well as the advantages of combining variable renewable energy sources with energy storage are elaborated. Finally, the world’s first utility-scale hybrid power plant combining wind, solar PV...

  14. Gas, benefits and question marks. The Oklo reactors: 100 % natural. The Kyoto protocol: use it or lose it?. Small hydro power: a great leap forward. The energy mix of South Korea

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This issue of Alternatives newsletter contains a main press-kit about natural gas economics worldwide and 4 articles dealing with the Oklo natural reactor, the Kyoto protocol, the small hydro-power in China, and the energy mix of South Korea: 1 - 'Gas benefits and question marks': The world's most widely distributed fossil fuel, natural gas is also the fastest-growing energy source of the past thirty years. Its position as the fuel of choice in the global energy mix is due in large part to its many domestic and industrial applications. 2 - 'The Oklo reactors: 100% natural': Another look at this extraordinary 2 billion year-old phenomenon in words and pictures: the nuclear fission reaction that created the natural reactors of Gabon. 3 - 'The Kyoto Protocol: use it or lose it?': Nearly eight years after its signature, the Kyoto Protocol is still hotly debated. Two experts give us their views: Spencer Abraham, former U.S. Secretary for Energy, and Jean-Charles Hourcade of CIRED, the international center for research on the environment and development. 4 - 'Small hydro power: a great leap forward': The Chinese government has responded to the need for rural electrification with an aid program for the country's poorest cantons. Enter the small hydro plant in northern Guangxi province. 5 - 'The energy mix of South Korea': Faced with continuing strong economic growth and energy demand, South Korea has multiplied its projects, from hydropower to tidal power to nuclear and even hydrogen in the longer term

  15. A comparison of the aquatic impacts of large hydro and small hydro projects

    Science.gov (United States)

    Taylor, Lara A.

    The expansion of small hydro development in British Columbia has raised concerns surrounding the effects of these projects, and the provincial government's decision to proceed with Site C has brought attention to the impacts of large hydro. Together, these decisions highlight that there are impacts associated with all energy development. My study examines the aquatic effects of large and small hydro projects using two case study sites: Site C and the Upper Harrison Water Power Project. I first determine the aquatic effects of each of the case study sites. Next, I use existing literature and benefits transfer to determine the monetary value of these effects. My results suggest that, with mitigation, small hydro projects have less of an effect on the environment than a large hydro project per unit of electricity. I also describe the implications of my study in the context of current British Columbia energy policy. Keywords: hydropower; aquatic effects. Subject Terms: environmental impact assessment; benefits transfer.

  16. The optimization of spent fuel assembly storage racks in nuclear power plants

    International Nuclear Information System (INIS)

    Wang Yan

    2005-01-01

    This paper gives an evaluation of the spent fuel assembly storage racks in the nuclear power plants at home and abroad, focusing on the characteristics of the high density storage racks and the aseismatic design. It mainly discusses structures and characteristics of the spent fuel assembly storage racks in the Qinshan nuclear power phase II project. Concluding the crucial technical difficulties of the high density spent fuel assembly storage racks: the neutron-absorbing materials, the structural aseismatic design technology and the security analysis technology, this paper firstly generalizes several important neutron-absorbing materials, then introduces the evolution of the aseismatic design of the spent fuel assembly storage racks . In the last part, it describes the advanced aseismatic analysis technology in the Qinshan nuclear power phase II project. Through calculation and analysis for such storage racks, the author concludes several main factors that could have an influence on the aseismatic performance and thus gives the key points and methods for designing the optimal racks and provides some references for the design of advanced spent fuel assembly storage racks in the future. (authors)

  17. A Wireless Power Sharing Control Strategy for Hybrid Energy Storage Systems in DC Microgrids

    DEFF Research Database (Denmark)

    Yang, Jie; Jin, Xinmin; Wu, Xuezhi

    2017-01-01

    In order to compensate multiple time scales power fluctuation resulted from distributed energy resources and loads, hybrid energy storage systems are employed as the buffer unit in DC microgrid. In this paper, a wireless hierarchical control strategy is proposed to realize power sharing between...

  18. Strategy Design of Hybrid Energy Storage System for Smoothing Wind Power Fluctuations

    Directory of Open Access Journals (Sweden)

    Jingyu Liu

    2016-11-01

    Full Text Available With the increasing contribution of wind power plants, the reliability and security of modern power systems have become a huge challenge due to the uncertainty and intermittency of wind energy sources. In this paper, a hybrid energy storage system (HESS consisting of battery and supercapacitor is built to smooth the power fluctuations of wind power. A power allocation strategy is proposed to give full play to the respective advantages of the two energy storage components. In the proposed strategy, the low-frequency and high-frequency components of wind power fluctuations are absorbed by battery groups and supercapacitor groups, respectively. By inhibiting the low-frequency components of supercapacitor current, the times of charging-discharging of battery groups can be significantly reduced. A DC/AC converter is applied to achieve the power exchange between the HESS and the grid. Adjustment rules for regulating state-of-charge (SOC of energy storage elements are designed to avoid overcharge and deep discharge considering the safety and the high efficiency of the energy storage elements. Experimental results on the test platform verify the effectiveness of the proposed power allocation strategy in DC/AC converter and battery SOC adjustment rules for regulating SOC levels.

  19. Design of Energy Storage Control Strategy to Improve the PV System Power Quality

    DEFF Research Database (Denmark)

    Lei, Mingyu; Yang, Zilong; Wang, Yibo

    2016-01-01

    Random fluctuation of PV power is becoming a more and more serious problem affecting the power quality and stability of grid as the PV penetration keeps increasing recent years. Aiming at this problem, this paper proposed a control strategy of energy storage system based on Model Predictive Contr...

  20. Storage Solutions for Power Quality Problems in Cyprus Electricity Distribution Network

    Directory of Open Access Journals (Sweden)

    Andreas Poullikkas

    2014-01-01

    Full Text Available In this work, a prediction of the effects of introducing energy storage systems on the network stability of the distribution network of Cyprus and a comparison in terms of cost with a traditional solution is carried out. In particular, for solving possible overvoltage problems, several scenarios of storage units' installation are used and compared with the alternative solution of extra cable connection between the node with the lowest voltage and the node with the highest voltage of the distribution network. For the comparison, a case study of a typical LV distribution feeder in the power system of Cyprus is used. The results indicated that the performance indicator of each solution depends on the type, the size and the position of installation of the storage unit. Also, as more storage units are installed the better the performance indicator and the more attractive is the investment in storage units to solve power quality problems in the distribution network. In the case where the technical requirements in voltage limitations according to distribution regulations are satisfied with one storage unit, the installation of an additional storage unit will only increase the final cost. The best solution, however, still remains the alternative solution of extra cable connection between the node with the lowest voltage and the node with the highest voltage of the distribution network, due to the lower investment costs compared to that of the storage units.