WorldWideScience

Sample records for steam supply system

  1. An Isothermal Steam Expander for an Industrial Steam Supplying System

    Directory of Open Access Journals (Sweden)

    Chen-Kuang Lin

    2015-01-01

    Full Text Available Steam is an essential medium used in the industrial process. To ensure steam quality, small and middle scale boilers are often adopted. However, because a higher steam pressure (compared to the necessary steam pressure is generated, the boiler’s steam pressure will be reduced via a pressure regulator before the steam is directed through the process. Unfortunately, pressure is somewhat wasted during the reducing process. Therefore, in order to promote energy efficiency, a pressure regulator is replaced by a steam expander. With this steam expander, the pressure will be transformed into mechanical energy and extracted during the expansion process. A new type of isothermal steam expander for an industrial steam supplying system will be presented in the paper. The isothermal steam expander will improve the energy efficiency of a traditional steam expander by replacing the isentropic process with an isothermal expansion process. With this, steam condensation will decrease, energy will increase, and steam quality will be improved. Moreover, the mathematical model of the isothermal steam expander will be established by using the Schmidt theory, the same principle used to analyze Stirling engines. Consequently, by verifying the correctness of the theoretical model for the isothermal steam expander using experimental data, a prototype of 100 c.c. isothermal steam expander is constructed.

  2. Passive system with steam-water injector for emergency supply of NPP steam generators

    International Nuclear Information System (INIS)

    Il'chenko, A.G.; Strakhov, A.N.; Magnitskij, D.N.

    2009-01-01

    The calculation results of reliability indicators of emergency power supply system and emergency feed-water supply system of serial WWER-1000 unit are presented. To ensure safe water supply to steam generators during station blackout it was suggested using additional passive emergency feed-water system with a steam-water injector working on steam generators dump steam. Calculated analysis of steam-water injector operating capacity was conducted at variable parameters of steam at the entrance to injector, corresponding to various moments of time from the beginning of steam-and-water damping [ru

  3. Reconstruction of steam generators super emergency feadwater supply system (SHNC) and steam dump stations to the atmosphere system PSA

    International Nuclear Information System (INIS)

    Kuzma, J.

    2001-01-01

    Steam Generators Super Emergency Feadwater Supply System (SHNC) and Steam Dump Stations to the Atmosphere System (PSA) are two systems which cooperate to remove residual heat from reactor core after seismic event. SHNC assure feeding of the secondary site of steam generator (Feed) where after heat removal.from primary loops, is relieved to the atmosphere by PSA (Bleed) in form of steam. (author)

  4. Steam generators: critical components in nuclear steam supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Stevens-Guille, P D

    1974-02-28

    Steam generators are critical components in power reactors. Even small internal leaks result in costly shutdowns for repair. Surveys show that leaks have affected one half of all water-cooled reactors in the world with steam generators. CANDU reactors have demonstrated the highest reliability. However, AECL is actively evolving new technology in design, manufacture, inspection and operation to maintain reliability. (auth)

  5. Nuclear steam supply system and method of installation

    International Nuclear Information System (INIS)

    Tower, S.N.; Christenson, J.A.; Braun, H.E.

    1989-01-01

    This patent describes a method of providing a nuclear reactor power plant at a predetermined use site accessible by predetermined navigable waterways. The method is practiced with apparatus including a nuclear reactor system. The system has a nuclear steam-supply section. The method consists of: constructing a nuclear reactor system at a manufacturing site remote from the predetermined use site but accessible to the predetermined waterways for transportation from the manufacturing site to the predetermined use site, the nuclear reactor system including a barge with the nuclear steam supply section constructed integrally with the barge. Simultaneously with the construction of the nuclear reactor system, constructing facilities at the use site to be integrated with the nuclear reactor system to form the nuclear-reactor power plant; transporting the nuclear reactor system along the waterways to the predetermined use site; at the use site joining the removal parts of the altered nuclear reactor system to the remainder of the altered nuclear reactor system to complete the nuclear reactor system; and installing the nuclear reactor system at the predetermined use site and integrating the nuclear reactor system to interact with the facilities constructed at the predetermined use site to form the nuclear-reactor power plant

  6. Condensation induced water hammer in steam supply system

    International Nuclear Information System (INIS)

    Andrews, P.B.; Antaki, G.A.; Rawls, G.B.; Gutierrez, B.J.

    1995-01-01

    The accidental mixing of steam and water usually leads to condensation induced water hammer. This phenomenon is not uncommon in the power and process industries, and is of particular concern due to the high energies which accompany steam transients. The paper discusses the conditions which lead to a recent condensation induced water hammer in a 150 psig steam supply header. The ensuing structural damage, inspection and repairs are described. Finally, a list of design, maintenance and operational cautions are presented to help minimize the potential for condensation induced water hammer in steam lines

  7. Condensation induced water hammer in steam supply system

    International Nuclear Information System (INIS)

    Andrews, P.B.; Antaki, G.A.; Rawls, G.B.; Gutierrez, B.J.

    1995-01-01

    The accidental mixing of steam and water usually leads to condensation induced water hammer. THis phenomenon is not uncommon in the power and process industries, and is of particular concern due to the high energies which accompany steam transients. The paper discusses the conditions which lead to a recent condensation induced water hammer in a 150 psig steam supply header. The insuing structural damage, inspection and repairs are described. Finally, a list of design cautions are presented to help minimize the potential for condensation induced water hammer in steam lines

  8. Westinghouse Small Modular Reactor nuclear steam supply system design

    Energy Technology Data Exchange (ETDEWEB)

    Memmott, M. J.; Harkness, A. W.; Van Wyk, J. [Westinghouse Electric Company LLC, 600 Cranberry Woods Drive, Cranberry Twp. PA 16066 (United States)

    2012-07-01

    The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the first in a series of four papers which describe the design and functionality of the Westinghouse SMR. Also described in this series are the key drivers influencing the design of the Westinghouse SMR and the unique passive safety features of the Westinghouse SMR. Several critical motivators contributed to the development and integration of the Westinghouse SMR design. These design driving motivators dictated the final configuration of the Westinghouse SMR to varying degrees, depending on the specific features under consideration. These design drivers include safety, economics, AP1000{sup R} reactor expertise and experience, research and development requirements, functionality of systems and components, size of the systems and vessels, simplicity of design, and licensing requirements. The Westinghouse SMR NSSS consists of an integral reactor vessel within a compact containment vessel. The core is located in the bottom of the reactor vessel and is composed of 89 modified Westinghouse 17x17 Robust Fuel Assemblies (RFA). These modified fuel assemblies have an active core length of only 2.4 m (8 ft) long, and the entirety of the core is encompassed by a radial reflector. The Westinghouse SMR core operates on a 24 month fuel cycle. The reactor vessel is approximately 24.4 m (80 ft) long and 3.7 m (12 ft) in diameter in order to facilitate standard rail shipping to the site. The reactor vessel houses hot and cold leg channels to facilitate coolant flow, control rod drive mechanisms (CRDM), instrumentation and cabling, an intermediate flange to separate flow and instrumentation and facilitate simpler refueling, a pressurizer, a straight tube, recirculating steam

  9. Nuclear steam supply system KLT-40 enhanced safety as independent power supply source. Employment prospects

    International Nuclear Information System (INIS)

    Polunichev, V.I.; Sayanov, D.G.; Ardabievsky, A.A.

    1993-01-01

    High quality of KLT-40 nuclear steam supply system (NSSS) providing enhanced safety is attained owing to the development and operation experience of equipments and systems in Soviet nuclear icebreakers. First of all they are the operating nuclear-powered icebreakers open-quotes Arktikaclose quotes, open-quotes Sibirclose quotes, open-quotes Rossiyaclose quotes, open-quotes Sovetsky Soyuzclose quotes, the limited draught icebreakers of joint Soviet-Finnish manufacturing open-quotes Taimyrclose quotes open-quotes Vaigachclose quotes. 30-years trouble-free operation of icebreaker open-quotes Leninclose quotes, the ancestor of nuclear powered fleet, is unprecedented. Operation life of individual equipment items amounts to 107000 hours, that testifies to high reliability and life characteristics of NSSS. Trouble-free operation of the nuclear-powered icebreakers' reactor plants (RPs) exceeded 130 reactor years, that proves high quality of design decisions being underlain in the basis of the KLT-40 NSSS for the lighter-cargo carrier open-quotes Sevmorputclose quotes, which was put into operation into 1988. Besides it testifies to the expediency of KLT-40 NSSS employment as a power source in different power installations. The KLT-40 is a reactor plant with a pwr type reactor. The design is described in detail with diagrams

  10. Application of nuclear steam supply system of NIKA series for seawater desalination

    International Nuclear Information System (INIS)

    Adamovich, L.A.; Achkasov, A.N.; Grechko, G.I.; Pavlov, V.L.; Shishkin, V.A.

    1998-01-01

    The nuclear steam supply system (NSSS) NIKA has been developed on the basis of experience available in Russia in designing, construction and operation of similar systems for ship propulsion reactors. Major systems and equipment of the NSSS are designed to take advantage of the proven engineering features and to meet Russian regulations, standards, practices and up-to-date safety philosophy. NSSS NIKA-75 has been designed for arrangement on barge. This permits to manufacture all NSSS equipment at the factory and to deliver it to the exploitation area ready for operation. NSSS NIKA-300 is designed for erection on land. It seems very interesting to use those NSSS types for seawater desalination. The main technical solutions, concept statements, technical and economical evaluations of NIKA series nuclear steam supply systems for seawater desalination are described. (author)

  11. RELAP/MOD1.5 analysis of steam line break transients for a 3-loop and a 4-loop Westinghouse nuclear steam supply system

    International Nuclear Information System (INIS)

    Peeler, G.B.; McDonald, T.A.; Kennedy, M.F.

    1984-01-01

    RELAP/MOD1.5 (Cycle 31 and 34) calculations were made to assess the assumptions used by Westinghouse (W) to analyze mainsteam line break transients. Models of a W 3-loop and 4-loop nuclear steam supply system were used. Sensitivity studies were performed to determine the effect of the availability of offsite power, break size and initial core power. Comparison with W results indicated that if the assumptions used by W are replicated within the RELAP5 framework, then the W methodology for prediction of the Nuclear Steam Supply System (NSSS) response is conservative for steam line break transients

  12. Simulation of a Nuclear Steam Supply System (NSSS) of a PWR nuclear power plant

    International Nuclear Information System (INIS)

    Reis Martins Junior, L.L. dos.

    1980-01-01

    The following work intends to perform the digital simulation, of the Nuclear Steam Supply System (NSSS) of a PWR nuclear power plant for control systems design and analysis purposes. There are mathematical models for the reactor, the steam generator, the pressurizer and for transport lags of the coolant in the primary circuit. Nevertheless no one control system has been considered to permit any user the inclusion in the more convenient way of the desired control systems' models. The characteristics of the system in consideration are fundamentally equal to the ones of Almirante Alvaro Alberto Nuclear Power Plant, Unit I (Angra I) obtained in the Final Safety Analysis Report at Comissao Nacional de Energia Nuclear. (author)

  13. An autonomous nuclear power plant with integrated nuclear steam supply system designed for electric power and heat supply in remote areas with difficult access

    International Nuclear Information System (INIS)

    Adamovich, L.A.; Grechko, G.I.; Lapin, B.D.; Ulasevich, V.K.; Shishkin, V.A.

    1997-01-01

    The paper contains basic conceptual principles used to develop the technical assignment for an autonomous nuclear power plant with integrated nuclear steam supply system (NSSS) designed to provide heat and electricity for areas which are remote with difficult access. The paper also describes technical procedures and equipment, NPP thermal hydraulic flow chart, steam generator design, safety aspects as well as operational and maintenance procedures. (author)

  14. Model-Free Coordinated Control for MHTGR-Based Nuclear Steam Supply Systems

    Directory of Open Access Journals (Sweden)

    Zhe Dong

    2016-01-01

    Full Text Available The modular high temperature gas-cooled reactor (MHTGR is a typical small modular reactor (SMR that offers simpler, standardized and safer modular design by being factory built, requiring smaller initial capital investment, and having a shorter construction period. Thanks to its small size, the MHTGRs could be beneficial in providing electric power to remote areas that are deficient in transmission or distribution and in generating local power for large population centers. Based on the multi-modular operation scheme, the inherent safety feature of the MHTGRs can be applicable to large nuclear plants of any desired power rating. The MHTGR-based nuclear steam supplying system (NSSS is constituted by an MHTGR, a side-by-side arranged helical-coil once-through steam generator (OTSG and some connecting pipes. Due to the side-by-side arrangement, there is a tight coupling effect between the MHTGR and OTSG. Moreover, there always exists the parameter perturbation of the NSSSs. Thus, it is meaningful to study the model-free coordinated control of MHTGR-based NSSSs for safe, stable, robust and efficient operation. In this paper, a new model-free coordinated control strategy that regulates the nuclear power, MHTGR outlet helium temperature and OTSG outlet overheated steam temperature by properly adjusting the control rod position, helium flowrate and feed-water flowrate is established for the MHTGR-based NSSSs. Sufficient conditions for the globally asymptotic closed-loop stability is given. Finally, numerical simulation results in the cases of large range power decrease and increase illustrate the satisfactory performance of this newly-developed model-free coordinated NSSS control law.

  15. Specific properties of the electrical equipment in the nuclear steam supply system; Specificnosti elektricne opreme u primarnom djelu nuklearne elektrane

    Energy Technology Data Exchange (ETDEWEB)

    Smiljanic, D [Rade Koncar Institut, Zagreb (Yugoslavia)

    1979-07-01

    The paper presents description of reactor coolant pump motor in the primary coolant loop. The motor is treated as a representative of all electrical equipment in the nuclear steam supply system that has to meet all the requirements concerning reliability, minimum maintenance, radiation, seismic etc. (author)

  16. Power plant and system for accelerating a cross compound turbine in such plant, especially one having an HTGR steam supply

    International Nuclear Information System (INIS)

    Jaegtnes, K.O.; Braytenbah, A.S.

    1977-01-01

    An electric power plant having a cross compound steam turbine and a steam source that includes a high temperature gas-cooled nuclear reactor is described. The steam turbine includes high and intermediate-pressure portions which drive a first generating means, and a low-pressure portion which drives a second generating means. The steam source supplies superheat steam to the high-pressure turbine portion, and an associated bypass permits the superheat steam to flow from the source to the exhaust of the high-pressure portion. The intermediate and low-pressure portions use reheat steam; an associated bypass permits reheat steam to flow from the source to the low-pressure exhaust. An auxiliary turbine driven by steam exhausted from the high-pressure portion and its bypass drives a gas blower to propel the coolant gas through the reactor. While the bypass flow of reheat steam is varied to maintain an elevated pressure of reheat steam upon its discharge from the source, both the first and second generating means and their associated turbines are accelerated initially by admitting steam to the intermediate and low-pressure portions. The electrical speed of the second generating means is equalized with that of the first generating means, whereupon the generating means are connected and acceleration proceeds under control of the flow through the high-pressure portion. 29 claims, 2 figures

  17. ORTAP: a nuclear steam supply system simulation for the dynamic analysis of high temperature gas cooled reactor transients

    International Nuclear Information System (INIS)

    Cleveland, J.C.; Hedrick, R.A.; Ball, S.J.; Delene, J.G.

    1977-01-01

    ORTAP was developed to predict the dynamic behavior of the high temperature gas cooled reactor (HTGR) Nuclear Steam Supply System for normal operational transients and postulated accident conditions. It was developed for the Nuclear Regulatory Commission (NRC) as an independent means of obtaining conservative predictions of the transient response of HTGRs over a wide range of conditions. The approach has been to build sufficient detail into the component models so that the coupling between the primary and secondary systems can be accurately represented and so that transients which cover a wide range of conditions can be simulated. System components which are modeled in ORTAP include the reactor core, a typical reheater and steam generator module, a typical helium circulator and circulator turbine and the turbine generator plant. The major plant control systems are also modeled. Normal operational transients which can be analyzed with ORTAP include reactor start-up and shutdown, normal and rapid load changes. Upset transients which can be analyzed with ORTAP include reactor trip, turbine trip and sudden reduction in feedwater flow. ORTAP has also been used to predict plant response to emergency or faulted conditions such as primary system depressurization, loss of primary coolant flow and uncontrolled removal of control poison from the reactor core

  18. Secondary coolant circuit operation tests: steam generator feedwater supply

    International Nuclear Information System (INIS)

    Beroux, M.

    1985-01-01

    No one important accident occurred during the start-up tests of the 1300MWe P4 series, concerning the feedwater system of steam generators (SG). This communication comments on some incidents, that the tests allowed to detect very soon and which had no consequences on the operation of units: 1) Water hammer in feedwater tubes, and incidents met in the emergency steam generator water supply circuit. The technological differences between SG 900 and 1300 are pointed out, and the measures taken to prevent this problem are presented. 2) Incidents met on the emergency feedwater supply circuit of steam generators; mechanical or functional modifications involved by these incidents [fr

  19. Power plant and system for accelerating a cross compound turbine in such plant, especially one having an HTGR steam supply

    International Nuclear Information System (INIS)

    Jaegtnes, K.O.; Braytenbah, A.S.

    1979-01-01

    In accordance with the present invention, a power plant includes a steam source to generate superheat and reheat steam which flows through a turbine-generator and an associated bypass system. A high-pressure and an intermediate-pressure turbine portion drive a first electrical generating means, and a low-pressure turbine portion drives a second electrical generating means. A first flow of superheat steam flows through the high-pressure portion, while a second flow of reheat steam flows through the intermediate and low-pressure portions in succession. Provision is made for bypassing steam around the turbine portions; in particular, one bypass means permits a flow of superheat steam from the steam source to the exhaust of the high-pressure portion, and another bypass means allows reheated steam to pass from the source to the exhaust of the low-pressure portion. The first and second steam flows are governed independently. While one of such flows is varied for purposes of controlling the rotational speed of the first generating means according to a desired speed, the other flow is varied to regulate a power plant variable at its desired level. (author)

  20. Supercritical Water Nuclear Steam Supply System: Innovations In Materials, Neutronics and Thermal-Hydraulics

    International Nuclear Information System (INIS)

    Anderson, Mark; Corradini, M.L.; Sridharan, K.; Wilson, P.; Cho, D.; Kim, T.K.; Lomperski, S.

    2004-01-01

    In the 1990's supercritical light-water reactors were considered in conceptual designs. A nuclear reactor cooled by supercritical waster would have a much higher thermal efficiency with a once-through direct power cycle, and could be based on standardized water reactor components (light water or heavy water). The theoretical efficiency could be improved by more than 33% over that of other water reactors and could be simplified with higher reliability; e.g., a boiling water reactor without steam separators or dryers

  1. A model of Altio Lazio boiling water reactor using the LEGO code nuclear steam supply system simulation

    International Nuclear Information System (INIS)

    Garbossa, G.B.; Spelta, S.; Cori, R.; Mosca, R.; Cento, P.

    1989-01-01

    An extensive effort has been made at the Italian National Electricity Board (ENEL) to construct and validate a LEGO model capable of simulating the operational transients of the Alto Lazio Nuclear Station, a two-twin units site with BWR/6 class reactors, rated at 2894 MWt and with Mark III containment. The desired end-product of this effort is an overall plant model consisting of the Nuclear Steam Supply System model, described in this paper, and the Balance of Plant model, capable of simulating the transient response of Alto Lazio Station. The models utilize the in-house developed LEGO code, which is a modular package oriented to power plant modeling and suitable to perform transient analyses to assist during power plant design, control system design and operating procedure verification. The ability of the NSSS model to predict correctly the plant response is demonstrated through comparison with results calculated by the vendor, using REDY code, and by an in-house RETRAN-02 model

  2. The use of engineering features and schematic solutions of propulsion nuclear steam supply systems for floating nuclear power plant design

    International Nuclear Information System (INIS)

    Achkasov, A.N.; Grechko, G.I.; Pepa, V.N.; Shishkin, V.A.

    2000-01-01

    In recent years many countries and the international community represented by the IAEA have shown a notable interest in designing small and medium size nuclear power plants intended for electricity and heat generation for remote areas. These power plants can be also used for desalination purposes. As these nuclear plants are planned for use in areas without a well-developed power grid, the design shall account for their transportation to the site in complete preparedness for operation. Since the late 80s, the Research and Development Institute of Power Engineering (RDIPE) has carried out active efforts in designing reactor facilities for floating nuclear power plants. This work relies on the long-term experience of RDIPE engineers in designing the propulsion NSSS. Advantages can be gained from the specific engineering solutions that are already applied in the design of propulsion Nuclear Steam Supply System (NSSS) or from development of new designs based on the proven technologies. Successful implementation of the experience has been made easier owing to rather similar design requirements prescribed to ship-mounted NSSS and floating NPP. The common design targets are, in particular, minimization of mass and dimensions, resistance to such external impacts as rolling, heel and trim, operability in case of running aground or collision with other ships, etc. (author)

  3. French experience in transient data collection and fatigue monitoring of PWR's nuclear steam supply system

    International Nuclear Information System (INIS)

    Sabaton, M.; Morilhat, P.; Savoldelli, D.; Genette, P.

    1995-10-01

    Electricite de France (EDF), the french national electricity company, is operating 54 standardized pressurizer water reactors. This about 500 reactor-years experience in nuclear stations operation and maintenance area has allowed EDF to develop its own strategy for monitoring of age-related degradations of NPP systems and components relevant for plant safety and reliability. After more than fifteen years of experience in regulatory transient data collection and seven years of successful fatigue monitoring prototypes experimentation, EDF decided to design a new system called SYSFAC (acronym for SYsteme de Surveillance en FAtigue de la Chaudiere) devoted to transient logging and thermal fatigue monitoring of the reactor coolant pressure boundary. The system is fully automatic and directly connected to the on-site data acquisition network without any complementary instrumentation. A functional transient detection module and a mechanical transient detection module are in charge of the general transient data collection. A fatigue monitoring module is aimed towards a precise surveillance of five specific zones particularly sensible to thermal fatigue. After the first step of preliminary studies, the industrial phase of the SYSFAC project is currently going on, with hardware and software tests and implementation. The first SYSFAC system will be delivered to the pilot power plant by the beginning of 1996. The extension to all EDF's nuclear 900 MW is planned after one more year of feedback experience. (authors). 12 refs., 3 figs

  4. Simulation of a Nuclear Steam Supply System (NSSS) of a PWR nuclear power plant. Simulacao do sistema nuclear de geracao de vapor de uma central PWR

    Energy Technology Data Exchange (ETDEWEB)

    Reis Martins Junior, L.L. dos.

    1980-01-01

    The following work intends to perform the digital simulation, of the Nuclear Steam Supply System (NSSS) of a PWR nuclear power plant for control systems design and analysis purposes. There are mathematical models for the reactor, the steam generator, the pressurizer and for transport lags of the coolant in the primary circuit. Nevertheless no one control system has been considered to permit any user the inclusion in the more convenient way of the desired control systems' models. The characteristics of the system in consideration are fundamentally equal to the ones of Almirante Alvaro Alberto Nuclear Power Plant, Unit I (Angra I) obtained in the Final Safety Analysis Report at Comissao Nacional de Energia Nuclear. (author).

  5. Station power supply by residual steam of Fugen

    Energy Technology Data Exchange (ETDEWEB)

    Kamiya, Y.; Kato, H.; Hattori, S. (Power Reactor and Nuclear Fuel Development Corp., Tokyo (Japan))

    1981-09-01

    In the advanced thermal reactor ''Fugen'', when the sudden decrease of load more than 40% occurs due to the failure of power system, the turbine regulating valve is rapidly shut, and the reactor is brought to scrum. However, the operation of turbo-generators is continued with the residual steam in the reactor, and the power for inside the station is supplied for 30 sec by the limiting timer, then the power-generating plant is automatically stopped. The reasons why such design was adopted are to reduce manual operation at the time of emergency, to continue water supply for cooling the reactor and to maintain the water level in the steam drum, and to reduce steam release from the safety valve and the turbine bypass valve. The output-load unbalance relay prevents the everspeed of the turbo-generator when load decreased suddenly, but when the failure of power system is such that recovers automatically in course of time, it does not work. The calculation for estimating the dynamic characteristics at the time of the sole operation within the station is carried out by the analysis code FATRAC. The input conditions for the calculation and the results are reported. Also the dynamic characteristics were actually tested to confirm the set value of the limiting timer and the safe working of turbine and generator trips. The estimated and tested results were almost in agreement.

  6. Steam generator auxiliary systems

    International Nuclear Information System (INIS)

    Heinz, A.

    1982-01-01

    The author deals with damage and defect types obtaining in auxiliary systems of power plants. These concern water/steam auxiliary systems (feed-water tank, injection-control valves, slide valves) and air/fluegas auxiliary systems (blowers, air preheaters, etc.). Operating errors and associated damage are not dealt with; by contrast, weak spots are pointed out which result from planning and design. Damage types and events are collected in statistics in order to facilitate damage evaluation for arriving at improved design solutions. (HAG) [de

  7. Development of a simulation platform for dynamic simulation and control studies of AP1000 nuclear steam supply system

    International Nuclear Information System (INIS)

    Wan, Jiashuang; Song, Hongbing; Yan, Shoujun; Sun, Jian; Zhao, Fuyu

    2015-01-01

    Highlights: • A fast-running simulation platform named NCAP was developed on a personal computer using MATLAB/Simulink. • Three types of typical operations, namely 10% step load change, 5%/min ramp load change and load follow were simulated. • NCAP predictions were compared with those obtained by CENTS for the load regulation transients. - Abstract: This paper presents the development, application and performance assessment of a fast-running NCAP (NSSS Control & Analysis Platform) in MATLAB/Simulink environment. First, a nodal core model, a lumped parameter dynamic steam generator model with moving boundary, a non-equilibrium two-regions-three-volumes pressurizer model, and the relevant pipe and plenum models were proposed based on the fundamental conservation of mass, energy and momentum. Then, these first order nonlinear models and the NSSS control systems were implemented in the Simulink by the predefined library blocks. Based on the developed NCAP, three types of typical operational transients, namely the 10% step load change, the 5%/min ramp load change and the daily load follow were simulated to study the dynamic behavior and control characteristics of the AP1000 NSSS. It has been demonstrated that the dynamic responses of the selected key parameters agree well with the general physical rules. In addition, the comparison of load regulation simulation results obtained by NCAP and CENTS shows a good agreement in terms of the changing trends. With the adoption of modular programming techniques, the NCAP facilitates easy modification and runs quickly, which easily allows the control system designer to test and compare various ideas efficiently

  8. Technical and economic studies of small reactors for supply of electricity and steam

    International Nuclear Information System (INIS)

    Spiewak, I.; Klepper, O.H.; Fuller, L.C.

    1977-02-01

    Several years ago conventional opinion held that nuclear power plants must be very large to be competitive with fossil fuels. This situation has changed markedly in most countries within recent years, as oil and gas supplies have become more scarce and costly. Studies have been carried out for several nuclear steam supply systems in the small and intermediate size range. Detail studies are reported of the Consolidated Nuclear Steam Generator (CNSG), a 365 MW(th) pressurized water reactor being developed by Babcock and Wilcox, as applied to industrial energy needs. Both conventional and barge-mounted nuclear steam supply systems are considered. Conceptual studies have been started of pressurized and boiling water reactors in the range of 1000 MW(th), which are envisioned for utility operation for supply of electric power and steam. Design studies of a 500 MW(th) high temperature reactor are also reported. The small reactors are expected to have higher unit costs than the large commercial plants, but to have compensating advantages in higher plant availability, shorter construction schedule, and greater siting flexibility. Studies are also reported of power cycle parameters and cost allocations for extraction of steam from steam turbine plants. This steam could be used for industrial energy, district heating, or desalination

  9. Technical and economic studies of small reactors for supply of electricity and steam

    International Nuclear Information System (INIS)

    Spiewak, I.; Klepper, O.H.; Fuller, L.C.

    1977-01-01

    Several years ago conventional opinion held that nuclear power plants must be very large to be competitive with fossil fuels. This situation has changed markedly in most countries within recent years, as oil and gas supplies have become more scarce and costly. Studies have been carried out of several nuclear steam supply systems in the small and intermediate size range. Detail studies are reported of the Consolidated Nuclear Steam Generator (CNSG), a 313 MW(t) pressurized water reactor being developed by Babcock and Wilcox, as applied to industrial energy needs. Both conventional and barge-mounted nuclear steam supply systems are considered. Conceptual studies have been started of pressurized and boiling water reactors in the range of 1000 MW(t), which are envisioned for utility operation for supply of electric power and steam. Design studies of a 500 MW(t) high temperature reactor are also reported. The small reactors are expected to have higher unit costs than the large commercial plants, but to have compensating advantages in higher plant availability, shorter construction schedule and greater siting flexibility. Studies are also reported of power cycle parameters and cost allocations for extraction of steam from steam turbine plants. This steam could be used for industrial energy, district heating or desalination

  10. Technical and economic studies of small reactors for supply of electricity and steam

    International Nuclear Information System (INIS)

    Spiewak, I.; Klepper, O.H.; Fuller, L.C.

    1977-01-01

    Several years ago conventional opinion held that nuclear power plants must be very large to be competitive with fossil fuels. This situation has changed markedly in most countries within recent years, as oil and gas supplies have become more scarce and costly. Studies have been carried out of several nuclear steam supply systems in the small and intermediate size range. Detail studies are reported of the Consolidated Nuclear Steam Generator (CNSG), a 313MW(th) pressurized water reactor being developed by Babcock and Wilcox, as applied to industrial energy needs. Both conventional and barge-mounted nuclear steam supply systems are considered. Conceptual studies have been started of pressurized and boiling water reactors in the range of 1000MW(th), which are envisioned for utility operation for supply of electric power and steam. Design studies of a 500MW(th) high temperature reactor are also reported. The small reactors are expected to have higher unit costs than the large commercial plants, but to have compensating advantages in higher plant availability, shorter construction schedule and greater siting flexibility. Studies are also reported of power cycle parameters and cost allocations for extraction of steam from steam turbine plants. This steam could be used for industrial energy, district heating or desalination. (author)

  11. IMPROVEMENT OF SYSTEMS OF TECHNICAL WATER SUPPLY WITH COOLING TOWERS FOR STEAM POWER PLANTS TECHNICAL AND ECONOMIC INDICATORS PERFECTION. Part 1

    Directory of Open Access Journals (Sweden)

    Yu. A. Zenovich-Leshkevich-Olpinskiy

    2016-01-01

    Full Text Available In order to reduce the temperature of cooling water and increase the efficiency of use of power resources the main directions of modernization of systems of technical water supply with cooling towers at steam power plants are presented. The problems of operation of irrigation systems and water distribution systems of cooling towers are reviewed. The design of heat and mass transfer devices, their shortcomings and the impact on the cooling ability of the cooling tower are also under analysis. The use of droplet heat and mass transfer device based on the lattice polypropylene virtually eliminates the shortcomings of the film and droplet-film heat and mass transfer devices of the cooling tower, increasing lifetime, and improving the reliability and efficiency of the operation of the main equipment of thermal power plants. The design of the water distribution devices of cooling towers is also considered. It is noted that the most effective are water-spattering low-pressure nozzles made of polypropylene that provides uniform dispersion of water and are of a high reliability and durability.

  12. Steam supply and power cogeneration at Yanshan Petrochemical Co., Ltd.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a project was studied for the improvement of cogeneration facilities with steam supply of 600t/h and electric output of 55MW at Beijing Yanshan Petrochemical Co., China. In Plan A, fuel is changed from heavy oil to natural gas, and two heavy oil boilers are replaced with two gas turbines and two exhaust heat recovery steam generators for steam supply of 241t/h per unit and electric output of 136.9MW per unit. In Plan B, the boilers are replaced with three gas turbines and three exhaust heat recovery steam generators for steam supply of 210t/h per unit and electric output of 79.5MW per unit. The initial investment is 700 million yuan {+-} 100 million yuan in Plan A, and 500 million yuan {+-} 100 million yuan in Plan B. The generating cost is 0.403 yuan/kWh in Plan A, and 0.455 yuan/kWh in Plan B. It was concluded that without Plan A, the project will not be economically successful. In Plan A, the energy conservation will be 887,847 toe/y heavy oil equivalent, which increases productivity. Further, the amount of greenhouse effect gas emissions will be 2,747,187 t-CO2/y. (NEDO)

  13. Steam coal trade: demand, supply and prices to 2020

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report on the international seaborne steam coal market was prepared using an electricity generation model developed for each coal-importing country, with the aid of WEFA Energy's power station database. The report contains chapters on: import demand forecasting methodology; orimulsion (environmental considerations and market potential); Scandinavia; North West Europe; British Isles; South West Europe; Eastern Europe; Eastern Mediterranean and North Africa; Asia; Latin America; North America; world steam coal demand summary; trade and price forecasting methodology; base case forecast; shipping rates; import demand; export supply and foreign exchange rates.

  14. Requalification of the steam supply systems of Units 3 and 4 of the Kozloduy NPP to a new model WWER-440/B-209M

    International Nuclear Information System (INIS)

    Iordanov, I.; Ourutchev, V.; Stoev, M.; Sabinov, S.

    2001-01-01

    In order to achieve significant advances in operational safety level, the project characteristics, the possibility of safety systems upgrading and operational conditions of Units 1 to 4 of the Kozloduy NPP were an object of very serious and in-depth analysis in the years 1990-2000. This systematic evaluation was initiated under the broad international concern resulted from the conclusions of IAEA missions held during 1990-1991 to assess the safety of the units. As a result of the efforts of the plant staff and many international experts the operational conditions, design safety and plant management were dramatically improved which resulted in bringing the plant to a new safety level. This review also developed such that the design safety features of Units 3 and 4 are significantly different from those units of the so-called V-230 group. The principle difference and advantages of Units 3 and 4 design were clarified and confirmed. A review process of the changed status of Units 3 and 4 safety was conducted in 1999-2000 with the help of IAEA experts and the experts of RISKAUDIT and WENRA. The process led to the conclusion that the significance of advantages of the safety level need to be encapsulated within a new safety case and the corresponding set of steps was combined as a 'Project for upgrading the Nuclear Steam Supply System of Units 3 and 4 of Kozloduy NPP to model WWER-440/B-209M'. The completion of the activities under this project is expected in 2002 following the major implementation phase during 2001/2002 units' outages. (author)

  15. Mathematical modeling of control system for the experimental steam generator

    Science.gov (United States)

    Podlasek, Szymon; Lalik, Krzysztof; Filipowicz, Mariusz; Sornek, Krzysztof; Kupski, Robert; Raś, Anita

    2016-03-01

    A steam generator is an essential unit of each cogeneration system using steam machines. Currently one of the cheapest ways of the steam generation can be application of old steam generators came from army surplus store. They have relatively simple construction and in case of not so exploited units - quite good general conditions, and functionality of mechanical components. By contrast, electrical components and control systems (mostly based on relay automatics) are definitely obsolete. It is not possible to use such units with cooperation of steam bus or with steam engines. In particular, there is no possibility for automatically adjustment of the pressure and the temperature of the generated steam supplying steam engines. Such adjustment is necessary in case of variation of a generator load. The paper is devoted to description of improvement of an exemplary unit together with construction of the measurement-control system based on a PLC. The aim was to enable for communication between the steam generator and controllers of the steam bus and steam engines in order to construction of a complete, fully autonomic and maintenance-free microcogeneration system.

  16. Mathematical modeling of control system for the experimental steam generator

    Directory of Open Access Journals (Sweden)

    Podlasek Szymon

    2016-01-01

    Full Text Available A steam generator is an essential unit of each cogeneration system using steam machines. Currently one of the cheapest ways of the steam generation can be application of old steam generators came from army surplus store. They have relatively simple construction and in case of not so exploited units – quite good general conditions, and functionality of mechanical components. By contrast, electrical components and control systems (mostly based on relay automatics are definitely obsolete. It is not possible to use such units with cooperation of steam bus or with steam engines. In particular, there is no possibility for automatically adjustment of the pressure and the temperature of the generated steam supplying steam engines. Such adjustment is necessary in case of variation of a generator load. The paper is devoted to description of improvement of an exemplary unit together with construction of the measurement-control system based on a PLC. The aim was to enable for communication between the steam generator and controllers of the steam bus and steam engines in order to construction of a complete, fully autonomic and maintenance-free microcogeneration system.

  17. Nuclear applications for steam and hot water supply

    International Nuclear Information System (INIS)

    1991-07-01

    An increase in the heat energy needs underlined by the potential increase in fossil fuel prices, particularly in oil supplies, and by the necessity for an improvement of the environment worldwide, as signalized by the IAEA Member States, prompted the decision to start a programme leading to this report. This document is intended to help to identify the experience of Member States where nuclear power plants or specialized nuclear heat plants are employed or envisaged to be used for distribution of steam or hot water to industrial or residential consumers, covering low and medium temperature ranges. 25 refs, 33 figs, 15 tabs

  18. Development of a Nuclear Steam Supply System Thermal-Hydraulic Module for the Nuclear Power Plant Simulator Using a Best-Estimate Code, RETRAN

    International Nuclear Information System (INIS)

    Suh, Jae Seung

    2004-08-01

    The NSSS (Nuclear Steam Supply System) thermal-hydraulic programs adopted in the domestic full-scope power plant simulators were provided in early 1980s by foreign vendors. Because of limited computational capability at that time, they usually used very simplified physical models for the real-time simulation of Ness thermal-hydraulic transients, which entails inaccurate results and, thus, the possibility of so-called 'negative training', especially for complicated two-phase flows in the reactor coolant system. To resolve the problem, a realistic NSSS thermal-hydraulic program ARTS has been developed, it was based on the RETRAN code for the improvement of the Nuclear Power Plant full-scope simulator. Since ARTS is a generalized code to solve a simultaneous equation system, the smaller time-step size should be used if converged solution could not obtain even in a single volume. Therefore, dedicated models which do not force to reduce the time-step size are sometimes more suitable in terms of a real-time calculation and robustness. The PRT(Pressurizer Relief Tank) is a good example, which requires a dedicated model. The PRT consists of subcooled water in bottom and non-condensable gas in top. The sparger merged under subcooled water enhances condensation. The complicated thermal-hydraulic phenomena such as condensation, phase separation with existence of non-condensable gas makes difficult to simulate. Therefore, the PRT volume may limit the time-step size if it is modeled with a general control volume. To mitigate the time-step size reduction due to convergence failure at this component using RETRAN, the PRT model was developed as a dedicated model. The dedicated model was expected to provide reasonable results without convergence problem in the analysis of the system transients. The ARTS code guarantees the real-time calculations of almost all transients and ensures the robustness of simulations. However, there are some possibilities of calculation failure in the

  19. The Steam Coal Market in 2016: the Supply Shock

    International Nuclear Information System (INIS)

    Cornot-Gandolphe, Sylvie

    2017-03-01

    Surprising coal markets: while the world coal demand is diminishing, the steam coal price doubled in 2016. After five years of uninterrupted price decline and a sluggish world demand, this strong price hike might appear as paradoxical. This paper explains the principal reasons for this situation. After five consecutive years of decline, international steam coal prices doubled in 2016. The main reason is not an increase in global coal consumption, which has been declining since 2014, including in 2016, but the tightening of supplies in the narrow international coal market. Policy changes in China have played a key role. To limit production over-capacity and halt the decline in domestic coal prices, the Chinese government has mandated a reduction in the number of working days in Chinese mines from 330 to 276. This decision has led to a fall in domestic production. Faced with rising coal demand in summer 2016, and surging domestic coal prices from end of June, China once again turned to the international market to cover its supply needs. It thus became again the world's largest coal importer, outpacing India. The increase in Chinese imports did not prevent Chinese demand from falling for the third consecutive year. On the supply side, after five years of declining prices, the export capacities of the main coal supplying countries have been reduced by mine closures, corporate bankruptcies and investment reductions in the sector. This led to the scissor effect observed in 2016, characterized by a sudden and unexpected increase in Chinese imports combined with a supply squeeze. Coal prices surged in the third quarter of 2016, before starting to decline. They have stabilized since December 2016, albeit at high levels. The decline could continue after winter 2016-17. The Chinese government intends to control the level of domestic coal prices to limit their impact on electricity prices and inflation. It has, therefore, relaxed its control on coal production, which has had

  20. Oxidation of Zircaloy-4 under limited steam supply at 1000 and 13000C

    International Nuclear Information System (INIS)

    Uetsuka, H.

    1984-12-01

    With the view of examining the oxidation behavior of Zircaloy-4 under limited steam supply occurring in severe accidents of LWRs, Zircaloy-4 cladding specimens were examined at the isothermal oxidation temperatures of 1000 and 1300 0 C under a steam atmosphere, flowing at a reduced and constant rate in the range of 3proportional170 mg/cm 2 xmin. The effect of steam starvation, which was restricted to very low levels of steam supply rate, was observed at the two examined temperatures. And the critical supply rate of steam starvation was evaluated to be 13 and 20 mg/cm 2 xmin for the oxidation at 1000 and 1300 0 C, respectively. Variation of the oxidation duration between 2 and 60 min at 1000 0 C allowed to compare the reaction kinetics for three different rates of steam supply. The short-term results confirmed the reduced reaction rates for the lower steam supplies. At the longer times, however, a clear trend towards linear kinetics was observed for the lower supplies. This can be interpreted as the result of earlier breakaway transition under limited steam supply. In the test at 1300 0 C, an acceleration of the oxidation rate was measured for the specified steam supply rate between 20 and 60 mg/cm 2 xmin. This related strongly with high hydrogen concentration in the atmosphere. Hydrogen blanketing - the retarding effect of hydrogen on Zircaloy oxidation - was not identified in the examined temperature range. (orig./HP) [de

  1. Optimum fuel allocation in parallel steam generator systems

    International Nuclear Information System (INIS)

    Bollettini, U.; Cangioli, E.; Cerri, G.; Rome Univ. 'La Sapienza'; Trento Univ.

    1991-01-01

    An optimization procedure was developed to allocate fuels into parallel steam generators. The procedure takes into account the level of performance deterioration connected with the loading history (fossil fuel allocation and maintenance) of each steam generator. The optimization objective function is the system hourly cost, overall steam demand being satisfied. Costs are due to fuel and electric power supply and to plant depreciation and maintenance as well. In order to easily updata the state of each steam generator, particular care was put in the general formulation of the steam production function by adopting a special efficiency-load curve description based on a deterioration scaling parameter. The influence of the characteristic time interval length on the optimum operation result is investigated. A special implementation of the method based on minimum cost paths is suggested

  2. Containments for consolidated nuclear steam systems

    International Nuclear Information System (INIS)

    Jabsen, F.S.

    1978-01-01

    A containment system for a consolidated nuclear steam system incorporating a nuclear core, steam generator and reactor coolant pumps within a single pressure vessel is described which is designed to provide radiation shielding and pressure suppression. Design details, including those for the dry well and wet well of the containment, are given. (UK)

  3. Optimization of Temperature Schedule Parameters on Heat Supply in Power-and-Heat Supply Systems

    Directory of Open Access Journals (Sweden)

    V. A. Sednin

    2009-01-01

    Full Text Available The paper considers problems concerning optimization of a temperature schedule in the district heating systems with steam-turbine thermal power stations having average initial steam parameters. It has been shown in the paper that upkeeping of an optimum network water temperature permits to increase an energy efficiency of heat supply due to additional systematic saving of fuel. 

  4. Steam Generator Inspection Planning Expert System

    International Nuclear Information System (INIS)

    Rzasa, P.

    1987-01-01

    Applying Artificial Intelligence technology to steam generator non-destructive examination (NDE) can help identify high risk locations in steam generators and can aid in preparing technical specification compliant eddy current test (ECT) programs. A steam Generator Inspection Planning Expert System has been developed which can assist NDE or utility personnel in planning ECT programs. This system represents and processes its information using an object oriented declarative knowledge base, heuristic rules, and symbolic information processing, three artificial intelligence based techniques incorporated in the design. The output of the system is an automated generation of ECT programs. Used in an outage inspection, this system significantly reduced planning time

  5. Steam generating system in LMFBR type reactors

    International Nuclear Information System (INIS)

    Kurosawa, Katsutoshi.

    1984-01-01

    Purpose: To suppress the thermal shock loads to the structures of reactor system and secondary coolant system, for instance, upon plant trip accompanying turbine trip in the steam generation system of LMFBR type reactors. Constitution: Additional feedwater heater is disposed to the pipeway at the inlet of a steam generator in a steam generation system equipped with a closed loop extended from a steam generator by way of a gas-liquid separator, a turbine and a condensator to the steam generator. The separated water at high temperature and high pressure from a gas-liquid separator is heat exchanged with coolants flowing through the closed loop of the steam generation system in non-contact manner and, thereafter, introduced to a water reservoir tank. This can avoid the water to be fed at low temperature as it is to the steam generator, whereby the thermal shock loads to the structures of the reactor system and the secondary coolant system can be suppressed. (Moriyama, K.)

  6. An expert system for steam generator maintenance

    International Nuclear Information System (INIS)

    Remond, A.

    1988-01-01

    The tube bundles in PWR steam generators are, by far, the major source of problems whether they are due to primary and secondary side corrosion mechanisms or to tube vibration-induced wear at tube support locations. Because of differences in SG operating, materials, and fabrication processes, the damage may differ from steam generator to steam generator. MPGV, an expert system for steam generator maintenance uses all steam generator data containing data on materials, fabrication processes, inservice inspection, and water chemistry. It has access to operational data for individual steam generators and contains models of possible degradation mechanisms. The objectives of the system are: · Diagnosing the most probable degradation mechanism or mechanisms by reviewing the entire steam generator history. · Identifying the tubes most exposed to future damage and evaluating the urgency of repair by simulating the probable development of the problem in time. · Establishing the appropriate preventive actions such as repair, inspection or other measures and establishing an action schedule. The system is intended for utilities either for individual plants before each inspection outage or any time an incident occurs or for a set of plants through a central MPGV center. (author)

  7. Development of a steam generator lancing system

    International Nuclear Information System (INIS)

    Jeong, Woo-Tae; Kim, Seok-Tae; Hong, Sung-Yull

    2006-01-01

    It is recommended to clean steam generators of nuclear power plants during plant outages. Under normal operations, sludge is created and constantly accumulates in the steam generators. The constituents of this sludge are different depending on each power plant characteristics. The sludge of the Kori Unit 1 steam generator, for example, was found to be composed of 93% ferrous oxide, 3% carbon and 1% of silica oxide and nickel oxide each. The research to develop a lancing system that would remove sludge deposits from the tubesheet of a steam generator was started in 1998 by the Korea Electric Power Research Institute (KEPRI) of the Korea Electric Power Corporation (KEPCO). The first commercial domestic lancing system in Korea, and KALANS-I Lancing System, was completed in 2000 for Kori Unit 1 for cleaning the tubesheet of its Westinghouse Delta-60 steam generator. Thereafter, the success of the development and site implementation of the KALANS-I lancing system for YGN Units 1 and 2 and Ulchin Units 3 and 4 was also realized in 2004 for sludge removal at those sites. The upper bundle cleaning system for Westinghouse model F steam generators is now under development

  8. AC power supply systems

    International Nuclear Information System (INIS)

    Law, H.

    1987-01-01

    An ac power supply system includes a rectifier fed by a normal ac supply, and an inverter connected to the rectifier by a dc link, the inverter being effective to invert the dc output of the receiver at a required frequency to provide an ac output. A dc backup power supply of lower voltage than the normal dc output of the rectifier is connected across the dc link such that the ac output of the rectifier is derived from the backup supply if the voltage of the output of the inverter falls below that of the backup supply. The dc backup power may be derived from a backup ac supply. Use in pumping coolant in nuclear reactor is envisaged. (author)

  9. Operating experience of the EBR-II steam generating system

    International Nuclear Information System (INIS)

    Buschman, H.W.; Penney, W.H.; Quilici, M.D.; Radtke, W.H.

    1981-01-01

    The Experimental Breeder Reactor II (EBR-II) is a Liquid Metal Fast Breeder Reactor (LMFBR) with integrated power producing capability. Superheated steam is produced by eight natural circulation evaporators, two superheaters, and a conventional steam drum. Steam throttle conditions are 438 C (820 F) and 8.62 MPa (1250 psi). The designs of the evaporators and superheaters are essentially identical; both are counterflow units with low pressure nonradioactive sodium on the shell side. Safety and reliability are maximized by using duplex tubes and tubesheets. The performance of the system has been excellent and essentially trouble free. The operating experience of EBR-II provides confidence that the technology can be applied to commercial LMFBR's for an abundant supply of energy for the future. 5 refs

  10. Control system for fluid heated steam generator

    Science.gov (United States)

    Boland, J.F.; Koenig, J.F.

    1984-05-29

    A control system for controlling the location of the nucleate-boiling region in a fluid heated steam generator comprises means for measuring the temperature gradient (change in temperature per unit length) of the heating fluid along the steam generator; means for determining a control variable in accordance with a predetermined function of temperature gradients and for generating a control signal in response thereto; and means for adjusting the feedwater flow rate in accordance with the control signal.

  11. Optimizing the Heat Exchanger Network of a Steam Reforming System

    DEFF Research Database (Denmark)

    Nielsen, Mads Pagh; Korsgaard, Anders Risum; Kær, Søren Knudsen

    2004-01-01

    Proton Exchange Membrane (PEM) based combined heat and power production systems are highly integrated energy systems. They may include a hydrogen production system and fuel cell stacks along with post combustion units optionally coupled with gas turbines. The considered system is based on a natural...... stationary numerical system model was used and process integration techniques for optimizing the heat exchanger network for the reforming unit are proposed. Objective is to minimize the system cost. Keywords: Fuel cells; Steam Reforming; Heat Exchanger Network (HEN) Synthesis; MINLP....... gas steam reformer along with gas purification reactors to generate clean hydrogen suited for a PEM stack. The temperatures in the various reactors in the fuel processing system vary from around 1000°C to the stack temperature at 80°C. Furthermore, external heating must be supplied to the endothermic...

  12. Thermodynamics of the silica-steam system

    Energy Technology Data Exchange (ETDEWEB)

    Krikorian, Oscar H [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1970-05-01

    In most nuclear cratering and cavity formation applications, the working fluid in the expanding cavity consists primarily of vaporized silica and steam. The chemical reaction products of silica and steam under these conditions are not known, although it is known that silica is very volatile in the presence of high-pressure steam under certain geologic conditions and in steam turbines. A review is made of work on the silica-steam system in an attempt to determine the vapor species that exist, and to establish the associated thermo-dynamic data. The review indicates that at 600-900 deg K and 1-100 atm steam pressure, Si(OH){sub 4} is the most likely silicon-containing gaseous species. At 600-900 deg. K and 100-1000 atm steam, Si{sub 2}O(OH){sub 6} is believed to predominate, whereas at 1350 deg K and 2000-9000 atm, a mixture of Si(OH){sub 4} and Si{sub 2}O(OH){sub 6} is consistent with the observed volatilities. In work at 1760 deg. K in which silica was reacted either with steam at 0.5 and 1 atm, or with gaseous mixtures of H{sub 2}/H{sub 2}O and O{sub 2}/H{sub 2}O at 1 atm total pressure, only part of the volatility could be accounted for by Si(OH){sub 4}. Hydrogen was found to greatly enhance the volatility of silica, and oxygen to suppress it. The species most likely to explain this behavior is believed to be SiO(OH). A number of other species may also be significant under these conditions. Thermodynamic data have been estimated for all species considered. The Si-OH bond dissociation energy is found to be {approx}117 kcal/mole in both Si(OH){sub 4} and Si{sub 2}O(OH){sub 6}. (author)

  13. Heat supply analysis of steam reforming hydrogen production process in conventional and nuclear

    International Nuclear Information System (INIS)

    Siti Alimah; Djati Hoesen Salimy

    2015-01-01

    Tile analysis of heat energy supply in the production of hydrogen by natural gas steam reforming process has been done. The aim of the study is to compare the energy supply system of conventional and nuclear heat. Methodology used in this study is an assessment of literature and analysis based on the comparisons. The study shows that the heat sources of fossil fuels (natural gas) is able to provide optimum operating conditions of temperature and pressure of 850-900 °C and 2-3 MPa, as well as the heat transfer is dominated by radiation heat transfer, so that the heat flux that can be achieved on the catalyst tube relatively high (50-80 kW/m"2) and provide high thermal efficiency of about 85 %. While in the system with nuclear energy, due to the demands of safety, process operating at less than optimum conditions of temperature and pressure of 800-850 °C and 4.5 MPa, as well as the heat transfer is dominated by convection heat transfer, so that the heat flux that can be achieved catalyst tube is relatively low (1020 kW/m"2) and it provides a low thermal efficiency of about 50 %. Modifications of reformer and heat utilization can increase the heat flux up to 40 kW/m"2 so that the thermal efficiency can reach 78 %. Nevertheless, the application of nuclear energy to hydrogen production with steam reforming process is able to reduce the burning of fossil fuels which has implications for the potential decrease in the rate of CO2 emissions into the environment. (author)

  14. Improving Steam System Performance: A Sourcebook for Industry, Second Edition

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-02-23

    This sourcebook is designed to provide steam system users with a reference that describes the basic steam system components, outlines opportunities for energy and performance improvements, and discusses the benefits of a systems approach in identifying and implementing these improvement opportunities. The sourcebook is divided into three main sections: steam system basics, performance improvement opportunities, and where to find help.

  15. The supply of steam from Candu reactors for heavy water production

    International Nuclear Information System (INIS)

    Robertson, R.F.S.

    1975-09-01

    By 1980, Canada's energy needs for D 2 O production will be 420 MW of electrical energy and 3600 MW of thermal energy (as steam). The nature of the process demands that this energy supply be exceptionally stable. Today, production plants are located at or close to nuclear electricity generating sites where advantage can be taken of the low cost of both the electricity and steam produced by nuclear reactors. Reliability of energy supply is achieved by dividing the load between the multiple units which comprise the sites. The present and proposed means of energy supply to the production sites at the Bruce Heavy Water Plant in Ontario and the La Prade Heavy Water Plant in Quebec are described. (author)

  16. Drying system for steam generators, particularly for steam generators of nuclear power stations

    International Nuclear Information System (INIS)

    Lavalerie, Claude; Borrel, Christian.

    1982-01-01

    A drying system is described which allows for modular construction and which provides a significant available exchange area in a reduced volume. All the drying elements are identical and are distributed according to a ternay circular symmetry and are placed radially and associated to steam guiding facilities which alternately provide around the axis of revolution an output volume of dry steam from one element and an input volume of wet steam in the following element [fr

  17. Analysis and decision document in support of acquisition of steam supply for the Hanford 200 Area

    Energy Technology Data Exchange (ETDEWEB)

    Brown, D.R.; Daellenbach, K.K.; Hendrickson, P.L.; Kavanaugh, D.C.; Reilly, R.W.; Shankle, D.L.; Smith, S.A.; Weakley, S.A.; Williams, T.A. (Pacific Northwest Lab., Richland, WA (United States)); Grant, T.F. (Battelle Human Affairs Research Center, Seattle, WA (United States))

    1992-02-01

    The US Department of Energy (DOE) is now evaluating its facility requirements in support of its cleanup mission at Hanford. One of the early findings is that the 200-Area steam plants, constructed in 1943, will not meet future space heating and process needs. Because the 200 Area will serve as the primary area for waste treatment and long-term storage, a reliable steam supply is a critical element of Hanford operations. This Analysis and Decision Document (ADD) is a preliminary review of the steam supply options available to the DOE. The ADD contains a comprehensive evaluation of the two major acquisition options: line-term versus privatization. It addresses the life-cycle costs associated with each alternative, as well as factors such as contracting requirements and the impact of market, safety, security, and regulatory issues. Specifically, this ADD documents current and future steam requirements for the 200 Area, describes alternatives available to DOE for meeting these requirements, and compares the alternatives across a number of decision criteria, including life-cycle cost. DOE has currently limited the ADD evaluation alternatives to replacing central steam plants rather than expanding the study to include alternative heat sources, such as a distributed network of boilers or heat pumps. Thirteen project alternatives were analyzed in the ADD. One of the alternatives was the rehabilitation of the existing 200-East coal-fired facility. The other twelve alternatives are combinations of (1) coal- or gas-fueled plants, (2) steam-only or cogeneration facilities, (3) primary or secondary cogeneration of electricity, and (4) public or private ownership.

  18. Improving Steam System Performance: A Sourcebook for Industry

    Energy Technology Data Exchange (ETDEWEB)

    2002-06-01

    The sourcebook is a reference for industrial steam system users, outlining opportunities to improve steam system performance. This Sourcebook is designed to provide steam system users with a reference that describes the basic steam system components, outlines opportunities for energy and performance improvements, and discusses the benefits of a systems approach in identifying and implementing these improvement opportunities. The Sourcebook is divided into the following three main sections: Section 1: Steam System Basics--For users unfamiliar with the basics of steam systems, or for users seeking a refresher, a brief discussion of the terms, relationships, and important system design considerations is provided. Users already familiar with industrial steam system operation may want to skip this section. This section describes steam systems using four basic parts: generation, distribution, end use, and recovery. Section 2: Performance Improvement Opportunities--This section discusses important factors that should be considered when industrial facilities seek to improve steam system performance and to lower operating costs. This section also provides an overview of the finance considerations related to steam system improvements. Additionally, this section discusses several resources and tools developed by the U. S. Department of Energy's (DOE) BestPractices Steam Program to identify and assess steam system improvement opportunities. Section 3: Programs, Contacts, and Resources--This section provides a directory of associations and other organizations involved in the steam system marketplace. This section also provides a description of the BestPractices Steam Program, a directory of contacts, and a listing of available resources and tools, such as publications, software, training courses, and videos.

  19. Moisture separator for steam generator level measurement system

    International Nuclear Information System (INIS)

    Cantineau, B.J.

    1987-01-01

    A steam generator level measurement system having a reference leg which is kept full of water by a condensation pot, has a liquid/steam separator in the connecting line between the condensation pot and the steam phase in the steam generator to remove excess liquid from the steam externally of the steam generator. This ensures that the connecting line does not become blocked. The separator pot has an expansion chamber which slows down the velocity of the steam/liquid mixture to aid in separation, and a baffle, to avoid liquid flow into the line connected to the condensate pot. Liquid separated is returned to the steam generator below the water level through a drain line. (author)

  20. Hybrid district heating system with heat supply from nuclear source

    International Nuclear Information System (INIS)

    Havelka, Z.; Petrovsky, I.

    1987-01-01

    Several designs are described of heat supply from large remote power sources (e.g., WWER-1000 nuclear power plants with a 1000 MW turbine) to localities where mainly steam distribution networks have been built but only some or none networks for hot water distribution. The benefits of the designs stem from the fact that they do not require the conversion of the local steam distribution system to a hot water system. They are based on heat supply from the nuclear power plant to the consumer area in hot water of a temperature of 150 degC to 200 degC. Part of the hot water heat will be used for the production of low-pressure steam which will be compressed using heat pumps (steam compressors) to achieve the desired steam distribution network specifications. Water of lower temperature can be used in the hot water network. The hot water feeder forms an automatic pressure safety barrier in heat supply of heating or technological steam from a nuclear installation. (Z.M.). 5 figs., 9 refs

  1. HTGR power plant hot reheat steam pressure control system

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegtnes, K.O.

    1975-01-01

    A control system for a high temperature gas cooled reactor (HTGR) power plant is disclosed wherein such plant includes a plurality of steam generators. Dual turbine-generators are connected to the common steam headers, a high pressure element of each turbine receiving steam from the main steam header, and an intermediate-low pressure element of each turbine receiving steam from the hot reheat header. Associated with each high pressure element is a bypass line connected between the main steam header and a cold reheat header, which is commonly connected to the high pressure element exhausts. A control system governs the flow of steam through the first and second bypass lines to provide for a desired minimum steam flow through the steam generator reheater sections at times when the total steam flow through the turbines is less than such minimum, and to regulate the hot reheat header steam pressure to improve control of the auxiliary steam turbines and thereby improve control of the reactor coolant gas flow, particularly following a turbine trip. (U.S.)

  2. Assessing reliability in energy supply systems

    International Nuclear Information System (INIS)

    McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

    2007-01-01

    Reliability has always been a concern in the energy sector, but concerns are escalating as energy demand increases and the political stability of many energy supply regions becomes more questionable. But how does one define and measure reliability? We introduce a method to assess reliability in energy supply systems in terms of adequacy and security. It derives from reliability assessment frameworks developed for the electricity sector, which are extended to include qualitative considerations and to be applicable to new energy systems by incorporating decision-making processes based on expert opinion and multi-attribute utility theory. The method presented here is flexible and can be applied to any energy system. To illustrate its use, we apply the method to two hydrogen pathways: (1) centralized steam reforming of imported liquefied natural gas with pipeline distribution of hydrogen, and (2) on-site electrolysis of water using renewable electricity produced independently from the electricity grid

  3. Optics Supply Planning System

    International Nuclear Information System (INIS)

    Gaylord, J.

    2009-01-01

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  4. Development of a nuclear steam generator system for gas-cooled reactors for application in oil sands extraction

    International Nuclear Information System (INIS)

    Smith, J.; Hart, R.; Lazic, L.

    2009-01-01

    Canada has vast energy reserves in the Oil Sands regions of Alberta and Saskatchewan. Present extraction technologies, such as strip mining, where oil deposits are close to the surface, and Steam Assisted Gravity Drainage (SAGD) technologies for deeper deposits consume significant amounts of energy to produce the bitumen and upgraded synthetic crude oil. Studies have been performed to assess the feasibility of using nuclear reactors as primary energy sources to produce, in particular the steam required for the SAGD deeper deposit extraction process. Presently available reactors fall short of meeting the requirements, in two areas: the steam produced in a 'standard' reactor is too low in pressure and temperature for the SAGD process. Requirements can be for steam as high as 12MPa pressure with superheat; and, 'standard' reactors are too large in total output. Ideally, reactors of output in the range of 400 to 500 MWth, in modules are better suited to Oil Sands applications. The above two requirements can be met using gas-cooled reactors. Generally, newer generation gas-cooled reactors have been designed for power generation, using Brayton Cycle gas turbines run directly from the heated reactor coolant (helium). Where secondary steam is required, heat recovery steam generators have been used. In this paper, a steam generating system is described which uses the high temperature helium from the reactor directly for steam generation purposes, with sufficient quantities of steam produced to allow for SAGD steam injection, power generation using a steam turbine-generator, and with potential secondary energy supply for other purposes such as hydrogen production for upgrading, and environmental remediation processes. It is assumed that the reactors will be in one central location, run by a utility type organization, providing process steam and electricity to surrounding Oil Sands projects, so steam produced is at very high pressure (12 MPa), with superheat, in order to

  5. AUTOMATIC CONTROL SYSTEM OF THE DRUM BOILER SUPERHEATED STEAM TEMPERATURE.

    Directory of Open Access Journals (Sweden)

    Juravliov A.A.

    2006-04-01

    Full Text Available The control system of the temperature of the superheated steam of the drum boiler is examined. Main features of the system are the PI-controller in the external control loop and introduction of the functional component of the error signal of the external control loop with the negative feedback of the error signal between the prescribed value of steam flowrate and the signal of the steam flowrate in the exit of the boiler in the internal control loop.

  6. Some Thoughts About Water Analysis in Shipboard Steam Propulsion Systems for Marine Engineering Students.

    Science.gov (United States)

    Schlenker, Richard M.; And Others

    Information is presented about the problems involved in using sea water in the steam propulsion systems of large, modern ships. Discussions supply background chemical information concerning the problems of corrosion, scale buildup, and sludge production. Suggestions are given for ways to maintain a good water treatment program to effectively deal…

  7. User's instructions for ORCENT II: a digital computer program for the analysis of steam turbine cycles supplied by light-water-cooled reactors

    International Nuclear Information System (INIS)

    Fuller, L.C.

    1979-02-01

    The ORCENT-II digital computer program will perform calculations at valves-wide-open design conditions, maximum guaranteed rating conditions, and an approximation of part-load conditions for steam turbine cycles supplied with throttle steam characteristic of contemporary light-water reactors. Turbine performance calculations are based on a method published by the General Electric Company. Output includes all information normally shown on a turbine-cycle heat balance diagram. The program is written in FORTRAN IV for the IBM System 360 digital computers at the Oak Ridge National Laboratory

  8. User's instructions for ORCENT II: a digital computer program for the analysis of steam turbine cycles supplied by light-water-cooled reactors

    Energy Technology Data Exchange (ETDEWEB)

    Fuller, L.C.

    1979-02-01

    The ORCENT-II digital computer program will perform calculations at valves-wide-open design conditions, maximum guaranteed rating conditions, and an approximation of part-load conditions for steam turbine cycles supplied with throttle steam characteristic of contemporary light-water reactors. Turbine performance calculations are based on a method published by the General Electric Company. Output includes all information normally shown on a turbine-cycle heat balance diagram. The program is written in FORTRAN IV for the IBM System 360 digital computers at the Oak Ridge National Laboratory.

  9. Steam Turbine Control Valve Stiction Effect on Power System Stability

    International Nuclear Information System (INIS)

    Halimi, B.

    2010-01-01

    One of the most important problems in power system dynamic stability is low frequency oscillations. This kind of oscillation has significant effects on the stability and security of the power system. In some previous papers, a fact was introduced that a steam pressure continuous fluctuation in turbine steam inlet pipeline may lead to a kind of low frequency oscillation of power systems. Generally, in a power generation plant, steam turbine system composes of some main components, i.e. a boiler or steam generator, stop valves, control valves and turbines that are connected by piping. In the conventional system, the turbine system is composed with a lot of stop and control valves. The steam is provided by a boiler or steam generator. In an abnormal case, the stop valve shuts of the steal flow to the turbine. The steam flow to the turbine is regulated by controlling the control valves. The control valves are provided to regulate the flow of steam to the turbine for starting, increasing or decreasing the power, and also maintaining speed control with the turbine governor system. Unfortunately, the control valve has inherent static friction (stiction) nonlinearity characteristics. Industrial surveys indicated that about 20-30% of all control loops oscillate due to valve problem caused by this nonlinear characteristic. In this paper, steam turbine control valve stiction effect on power system oscillation is presented. To analyze the stiction characteristic effect, firstly a model of control valve and its stiction characteristic are derived by using Newton's laws. A complete tandem steam prime mover, including a speed governing system, a four-stage steam turbine, and a shaft with up to for masses is adopted to analyze the performance of the steam turbine. The governor system consists of some important parts, i.e. a proportional controller, speed relay, control valve with its stiction characteristic, and stem lift position of control valve controller. The steam turbine has

  10. Upgraded Steam Generator Lancing System for Uljin NPP no.2

    International Nuclear Information System (INIS)

    Kim, Seok Tae; Jeong, Woo Tae; Hong, Sung Yull

    2005-01-01

    KEPRI(Korea Electric Power Research Institute) has developed various types of steam generator lancing systems since 1998. In this paper, we introduce a new lancing system with new improvements from the previous steam generator lancing system for Uljin NPP #2(nuclear power plant) constructed by KEPRI. The previous lancing system is registered as KALANS R -II and was developed for System-80 type steam generators. The previous lancing system was applied to Uljin unit #3 and it lowered radiation exposure of operators in comparison to manually operated lancing systems. And it effectively removed sludge accumulated around kidney bean zone in the Uljin unit #3 steam generators. But the previous lancing system could only clean partially the steam generators of Uljin unit #4. This was because the rail of the previous lancing system interfered with a part of the steam generator. Therefore we developed a new lancing system that can solve the interference problem. This new lancing system was upgraded from the previous lancing system. Also, a new lancing system for System-80 S/G will be introduced in this paper

  11. Diagnostic system of steam generator, especially molten metal heated steam generator

    International Nuclear Information System (INIS)

    Matal, O.; Martoch, J.

    1986-01-01

    A diagnostic system is described and graphically represented consisting of a leak detector, a medium analyzer and sensors placed on the piping connected to the indication sections of both tube plates. The advantage of the designed system consists in the possibility of detecting tube failure immediately on leak formation, especially in generators with duplex tubes. This shortens the period of steam generator shutdown for repair and reduces power losses. The design also allows to make periodical leak tests during planned steam generator shutdowns. (A.K.)

  12. Public Water Supply Systems (PWS)

    Data.gov (United States)

    Kansas Data Access and Support Center — This dataset includes boundaries for most public water supply systems (PWS) in Kansas (525 municipalities, 289 rural water districts and 13 public wholesale water...

  13. Current status and prospects for Kepco's steaming coal demand and supply

    International Nuclear Information System (INIS)

    Kim, E.W.

    1991-01-01

    Under the series of Korean Government 5 year economic development plans since 1962, energy consumption in Korea has increased at a rapid pace and industrialization in Korea has been accelerated. As far as coal imports are concerned, coking coal was first imported to Korea in the early 1970s for the first steelworks. Little interest was shown in steaming coal until the early 1970s owing to the cheaper imported oil. People became interested in steaming coal after the first oil crisis in 1973 and import began in 1980 for cement and other industrial uses. In general, electricity demand is increasing far more rapidly than energy consumption. The initial construction of two 560 megawatt power plants using bituminous coal began in 1978 and was completed in 1982. The maiden cargo of bituminous coal for power generation arrived in Korea that year and coal import has been increasing at a rapid rate since then to keep pace with increased consumption. As there are no indigenous bituminous coal resources in Korea and we must depend entirely on overseas coal for our needs to fuel power plants, stable securing of coal is very important. This paper explains the current status and prospects for KEPCOs (Korean Electric Power Corporation) coal demand and supply

  14. Genetic optimization of steam multi-turbines system

    International Nuclear Information System (INIS)

    Olszewski, Pawel

    2014-01-01

    Optimization analysis of partially loaded cogeneration, multiple-stages steam turbines system was numerically investigated by using own-developed code (C++). The system can be controlled by following variables: fresh steam temperature, pressure, and flow rates through all stages in steam turbines. Five various strategies, four thermodynamics and one economical, which quantify system operation, were defined and discussed as an optimization functions. Mathematical model of steam turbines calculates steam properties according to the formulation proposed by the International Association for the Properties of Water and Steam. Genetic algorithm GENOCOP was implemented as a solving engine for non–linear problem with handling constrains. Using formulated methodology, example solution for partially loaded system, composed of five steam turbines (30 input variables) with different characteristics, was obtained for five strategies. The genetic algorithm found multiple solutions (various input parameters sets) giving similar overall results. In real application it allows for appropriate scheduling of machine operation that would affect equable time load of every system compounds. Also based on these results three strategies where chosen as the most complex: the first thermodynamic law energy and exergy efficiency maximization and total equivalent energy minimization. These strategies can be successfully used in optimization of real cogeneration applications. - Highlights: • Genetic optimization model for a set of five various steam turbines was presented. • Four various thermodynamic optimization strategies were proposed and discussed. • Operational parameters (steam pressure, temperature, flow) influence was examined. • Genetic algorithm generated optimal solutions giving the best estimators values. • It has been found that similar energy effect can be obtained for various inputs

  15. Estimation of transient heat flux density during the heat supply of a catalytic wall steam methane reformer

    Science.gov (United States)

    Settar, Abdelhakim; Abboudi, Saïd; Madani, Brahim; Nebbali, Rachid

    2018-02-01

    Due to the endothermic nature of the steam methane reforming reaction, the process is often limited by the heat transfer behavior in the reactors. Poor thermal behavior sometimes leads to slow reaction kinetics, which is characterized by the presence of cold spots in the catalytic zones. Within this framework, the present work consists on a numerical investigation, in conjunction with an experimental one, on the one-dimensional heat transfer phenomenon during the heat supply of a catalytic-wall reactor, which is designed for hydrogen production. The studied reactor is inserted in an electric furnace where the heat requirement of the endothermic reaction is supplied by electric heating system. During the heat supply, an unknown heat flux density, received by the reactive flow, is estimated using inverse methods. In the basis of the catalytic-wall reactor model, an experimental setup is engineered in situ to measure the temperature distribution. Then after, the measurements are injected in the numerical heat flux estimation procedure, which is based on the Function Specification Method (FSM). The measured and estimated temperatures are confronted and the heat flux density which crosses the reactor wall is determined.

  16. Open channel steam generator feedwater system

    International Nuclear Information System (INIS)

    Kim, R.F.; Min-Hsiung Hu.

    1985-01-01

    A steam generator which utilizes a primary fluid to vaporize a secondary fluid is provided with an open flow channel and elevated discharge nozzle for the introduction of secondary fluid. The discharge nozzle is positioned above a portion of the inlet line such that the secondary fluid passes through a vertical section of inlet line prior to its discharge into the open channel. (author)

  17. Modular sludge collection system for a nuclear steam generator

    International Nuclear Information System (INIS)

    Appleman, R.H.; Bein, J.D.; Powasaki, F.S.

    1986-01-01

    A sludge collection system is described for a vertically oriented nuclear steam generator wherein vapors produced in the steam generator pass through means for separating entrained liquid from the vapor prior to the vapor being discharged from the steam generator. The sludge collection system comprises: an upwardly open chamber for collecting the separated liquid and feedwater entering the steam generator; upwardly open sludge collecting containers positioned within the chamber, wherein each of the containers includes a top rim encompassing an opening leading to the interior of each container; generally flat, perforated covers, each of the covers being positioned over one of the openings such that a gap is formed between the cover and the adjacent top rim; sludge agitating means on at least one of the containers; and sludge removal means on at least one of the containers

  18. Industrial steam systems and the energy-water nexus.

    Science.gov (United States)

    Walker, Michael E; Lv, Zhen; Masanet, Eric

    2013-11-19

    This paper presents estimates for water consumption and steam generation within U.S. manufacturing industries. These estimates were developed through the integration of detailed, industry-level fuel use and operation data with an engineering-based steam system model. The results indicate that industrial steam systems consume approximately 3780 TBTU/yr (3.98 × 10(9) GJ/yr) to generate an estimated 2.9 trillion lb/yr (1.3 trillion kg/yr) of steam. Since a good portion of this steam is injected directly into plant processes, vented, leaked, or removed via blowdown, roughly 354 MGD of freshwater must be introduced to these systems as makeup. This freshwater consumption rate is approximately 11% of that for the entire U.S. manufacturing sector, or the total residential consumption rate of Los Angeles, the second largest city in the U.S. The majority of this consumption (>94%) can be attributed to the food, paper, petroleum refining, and chemicals industries. The results of the analyses presented herein provide previously unavailable detail on water consumption in U.S. industrial steam systems and highlight opportunities for combined energy and water savings.

  19. Development of data management system for steam generator inspection

    International Nuclear Information System (INIS)

    Jung, Yong Moo; Im, Chang Jae; Lee, Yoon Sang; Kang, Soon Joo; An, Jong Kwan

    1994-06-01

    The data communications environment for transferring Nuclear Power Plant Steam Generator Eddy Current testing data was investigated and after connecting LAN to Hinet-F network, the remote data transfer with the speed of 56 kbps was tested successfully. Data management system for Steam Generator Eddy current testing was also developed by using HP-UX, RMB (Rock Mountain Basic) 21 figs, 13 tabs, 5 refs. (Author)

  20. Development of data management system for steam generator inspection

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Yong Moo; Im, Chang Jae; Lee, Yoon Sang; Kang, Soon Joo; An, Jong Kwan [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-06-01

    The data communications environment for transferring Nuclear Power Plant Steam Generator Eddy Current testing data was investigated and after connecting LAN to Hinet-F network, the remote data transfer with the speed of 56 kbps was tested successfully. Data management system for Steam Generator Eddy current testing was also developed by using HP-UX, RMB (Rock Mountain Basic) 21 figs, 13 tabs, 5 refs. (Author).

  1. Draining down of a nuclear steam generating system

    International Nuclear Information System (INIS)

    Jawor, J.C.

    1987-01-01

    The method is described of draining down contained reactor-coolant water from the inverted vertical U-tubes of a vertical-type steam generator in which the upper, inverted U-shaped ends of the tubes are closed and the lower ends thereof are open. The steam generator is part of a nuclear powered steam generating system wherein the reactor coolant water is normally circulated from and back into the reactor via a loop comprising the steam generator and inlet and outlet conduits connected to the lower end of the steam generator. The method comprises continuously introducing a gas which is inert to the system and which is under pressure above atmospheric pressure into at least one of the downwardly facing open ends of each of the U-tubes from below the tube sheet in which the open ends of the U-tubes are mounted adjacent the lower end of the steam generator, while permitting the water to flow out from the open ends of the U-tubes

  2. Implementation and rejection of industrial steam system energy efficiency measures

    International Nuclear Information System (INIS)

    Therkelsen, Peter; McKane, Aimee

    2013-01-01

    Steam systems consume approximately one third of energy applied at US industrial facilities. To reduce energy consumption, steam system energy assessments have been conducted on a wide range of industry types over the course of 5 years through the Energy Savings Assessment (ESA) program administered by the US Department of Energy (US DOE). ESA energy assessments result in energy efficiency measure recommendations that are given potential energy and energy cost savings and potential implementation cost values. Saving and cost metrics that measure the impact recommended measures will have at facilities, described as percentages of facility baseline energy and energy cost, are developed from ESA data and used in analyses. Developed savings and cost metrics are examined along with implementation and rejection rates of recommended steam system energy efficiency measures. Based on analyses, implementation of steam system energy efficiency measures is driven primarily by cost metrics: payback period and measure implementation cost as a percentage of facility baseline energy cost (implementation cost percentage). Stated reasons for rejecting recommended measures are primarily based upon economic concerns. Additionally, implementation rates of measures are not only functions of savings and cost metrics, but time as well. - Highlights: ► We examine uptake/rejection of industrial steam system energy efficiency measures. ► We examine metrics that correspond to uptake/rejection of recommended measures. ► We examine barriers hindering steam system energy efficiency measure implementation. ► Uptake/rejection of steam measures is linked to potential cost metrics. ► Increased uptake of measures and uptake of more costly measures increases with time

  3. Integrated steam generation process and system for enhanced oil recovery

    Energy Technology Data Exchange (ETDEWEB)

    Betzer-Zilevitch, M. [Ex-Tar Technologies Inc., Calgary, AB (Canada)

    2010-07-01

    A method of producing steam for the extraction of heavy bitumens was presented. The direct contact steam generation (DCSG) method is used for the direct heat transfer between combustion gas and contaminated liquid phase water to generate steam. This paper presented details of experimental and field studies conducted to demonstrate the DCSG. Results of the study demonstrated that pressure and temperature are positively correlated. As pressure increases, the flow rate of the discharged mass decreases and the steam ratio decreases. As pressure increases, the condensate and distillate flow rates increases while water vapor losses in the non-condensable gases decrease. The study indicated that for a 10 bar pressurized system producing 9.6 mt per hour of 10,000 kpa steam and 9.6 mt per hour of distillate BFW, 70 percent of the combustion energy should be recovered to generate 10,000 kpa pressure steam for EOR. Combustion energy requirements were found to decrease when pressure decreases. 11 refs., 5 tabs., 8 figs.

  4. Solution of multiple circuits of steam cycle HTR system

    International Nuclear Information System (INIS)

    Li, Fu; Wang, Dengying; Hao, Chen; Zheng, Yanhua

    2014-01-01

    In order to analyze the dynamic operation performance and safety characteristics of the steam cycle high temperature gas cooled reactor (HTR) systems, it is necessary to find the solution of the whole HTR systems with all coupled circuits, including the primary circuit, the secondary circuit, and the residual heat removal system (RHRS). Considering that those circuits have their own individual fluidity and characteristics, some existing code packages for independent circuits themselves have been developed, for example THEMRIX and TINTE code for the primary circuit of the pebble bed reactor, BLAST for once through steam generator. To solve the coupled steam cycle HTR systems, a feasible way is to develop coupling method to integrate these independent code packages. This paper presents several coupling methods, e.g. the equivalent component method between the primary circuit and steam generator which reflect the close coupling relationship, the overlapping domain decomposition method between the primary circuit and the passive RHRS which reflects the loose coupling relationship. Through this way, the whole steam cycle HTR system with multiple circuits can be easily and efficiently solved by integration of several existing code packages. Based on this methodology, a code package TINTE–BLAST–RHRS was developed. Using this code package, some operation performance of HTR–PM was analyzed, such as the start-up process of the plant, and the depressurized loss of forced cooling accident when different number of residual heat removal trains is operated

  5. Steam process supply optimization for Arcelormittal Tubarao consumers; Otimizacao do sistema de fornecimento de vapor de processo para a usina (AMT)

    Energy Technology Data Exchange (ETDEWEB)

    Loss, Gecimar; Oliveira, Heron Domingues de; Silva, Jose Geraldo Lessa; Beccalli, Marcelo; Calente, Paulo Sergio Boni; Monteiro, Sergio Anderson [Companhia Siderurgica de Tubarao ArcelorMittal, Serra, ES (Brazil)

    2010-07-01

    The ArcelorMittal Tubarao Energy Production area is compounded by three units: Air Separation Units, Thermal Power Plants and Thermal Recovery Power Plants. The Thermo Power Plants are co-generated units responsible to generate electrical, mechanical (Blast Furnace blower) energy and also provide Steam to complement the facility internal consumption mainly provided by CDQ plant (CDQ - Coke Dry Quenching). Since RH2 (steel treatment process) start up, the steam consumption increased and the Thermal Power Plant contribution raised to attend this new demand. Solutions were needed to guarantee the steam supply by the Power Plant even in low steam header stoppages for maintenance, since the lack of steam caused by shortage in Power Plant steam supply resulting in steel production diminution in this new scenario. (author)

  6. Water supply method to the fuel cell cooling water system; Nenryo denchi reikyakusuikei eno kyusui hoho

    Energy Technology Data Exchange (ETDEWEB)

    Urata, T. [Tokyo (Japan); Nishida, S. [Tokyo (Japan)

    1996-12-17

    The conventional fuel cell has long cooling water piping ranging from the fuel cell exit to the steam separator; in addition, the supply water is cooler than the cooling water. When the amount of supply water increases, the temperature of the cooling water is lowered, and the pressure fluctuation in the steam separator becomes larger. This invention relates to the water supply method of opening the supply water valve and supplying water from the supply water system to the cooling water system in accordance with the signal of the level sensor of the steam separator, wherein opening and closing of the supply valve are repeated during water supply. According to the method the pressure drop in every water supply becomes negligibly small; therefore, the pressure fluctuation of the cooling water system can be made small. The interval of the supply water valve from opening to closing is preferably from 3 seconds to 2 minutes. The method is effective when equipment for recovering heat from the cooling water is installed in the downstream pipeline of the fuel cell. 2 figs.

  7. CASTOR - Advanced System for VVER Steam Generator Inspection

    International Nuclear Information System (INIS)

    Mateljak, Petar

    2014-01-01

    From the safety point of view, steam generator is a very important component of a nuclear power plant. Only a thin tube wall prevents leakage of radioactive material from the primary side into the environment. Therefore, it is very important to perform inspections in order to detect pipe damage and apply appropriate corrective actions during outage. Application of the nondestructive examination (NDE) technique, that can locate degradation and measure its size and orientation, is an integral part of nuclear power plant maintenance. The steam generator inspection system is consisted of remotely controlled manipulator, testing instrument and software for data acquisition and analysis. Recently, the inspection systems have evolved to a much higher level of automation, efficiency and reliability resulting in a lower cost and shorter outage time. Electronic components have become smaller and deal with more complex algorithms. These systems are very fast, precise, reliable and easy to handle. The whole inspection, from the planning, examination, data analysis and final report, is now a highly automated process, which makes inspection much easier and more reliable. This paper presents the new generation of INETEC's VVER steam generator inspection system as ultimate solution for steam generator inspection and repair. (author)

  8. Implementation and Rejection of Industrial Steam System Energy Efficiency Measures

    Energy Technology Data Exchange (ETDEWEB)

    Therkelesen, Peter [Environmental Energy Technologies Division Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); McKane, Aimee [Environmental Energy Technologies Division Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)

    2013-05-01

    Steam systems consume approximately one third of energy applied at U.S. industrial facilities. To reduce energy consumption, steam system energy assessments have been conducted on a wide range of industry types over the course of five years through the Energy Savings Assessment (ESA) program administered by the U.S. Department of Energy (U.S. DOE). ESA energy assessments result in energy efficiency measure recommendations that are given potential energy and energy cost savings and potential implementation cost values. Saving and cost metrics that measure the impact recommended measures will have at facilities, described as percentages of facility baseline energy and energy cost, are developed from ESA data and used in analyses. Developed savings and cost metrics are examined along with implementation and rejection rates of recommended steam system energy efficiency measures. Based on analyses, implementation of steam system energy efficiency measures is driven primarily by cost metrics: payback period and measure implementation cost as a percentage of facility baseline energy cost (implementation cost percentage). Stated reasons for rejecting recommended measures are primarily based upon economic concerns. Additionally, implementation rates of measures are not only functions of savings and cost metrics, but time as well.

  9. Automatic system for redistributing feedwater in a steam generator of a nuclear power plant

    International Nuclear Information System (INIS)

    Fuoto, J.S.; Crotzer, M.E.; Lang, G.E.

    1980-01-01

    A system is described for automatically redistributing a steam generator secondary tube system after a burst in the secondary tubing. This applies to a given steam generator in a system having several steam generators partially sharing a common tube system, and employs a pressure control generating an electrical signal which is compared with given values [fr

  10. Influence of feedwater and blowdown systems on the mineral distribution in WWER steam generators

    International Nuclear Information System (INIS)

    Pappx, L.

    1994-01-01

    After modification of Dukovany NPP steam generator feedwater system, the increased concentration of minerals was measured in the cold leg of modified steam generator. Some modifications were performed on operating WWER 1000 steam generators with aim to optimize the water chemistry in the collectors area. Since the distribution of minerals can substantially affect on corrosion processes in steam generators, VITKOVICE, as a producer of WWER steam generators, has focused this attention on the optimizing of these systems. To predict the mineral distribution on the secondary side of steam generators for considered feedwater/blowdown systems, the simple model of flow distribution in the secondary side of SG was developed. (Author)

  11. The development of control systems for high power steam turbines

    International Nuclear Information System (INIS)

    Mathey, M.

    1983-01-01

    The functional and technological aspects of developments in the field of control systems for steam turbines over the last twenty years are analyzed. These developments have now culminated in very sophisticated systems which closely link electronics to high pressure hydraulic technology. A detailed description of these systeme high-lighting the high technical level of the control methods and the flexibility and reliability in service of turbines controlled in this way is given [fr

  12. On line instrument systems for monitoring steam turbogenerators

    Science.gov (United States)

    Clapis, A.; Giorgetti, G.; Lapini, G. L.; Benanti, A.; Frigeri, C.; Gadda, E.; Mantino, E.

    A computerized real time data acquisition and data processing for the diagnosis of malfunctioning of steam turbogenerator systems is described. Pressure, vibration and temperature measurements are continuously collected from standard or special sensors including startup or stop events. The architecture of the monitoring system is detailed. Examples of the graphics output are presented. It is shown that such a system allows accurate diagnosis and the possibility of creating a data bank to describe the dynamic characteristics of the machine park.

  13. 46 CFR 167.45-1 - Steam, carbon dioxide, and halon fire extinguishing systems.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Steam, carbon dioxide, and halon fire extinguishing....45-1 Steam, carbon dioxide, and halon fire extinguishing systems. (a) General requirements. (1...-extinguishing system. On such vessels contracted for prior to January 1, 1962, a steam smothering system may be...

  14. Development of main steam safety valve set pressure evaluating system

    International Nuclear Information System (INIS)

    Oketani, Koichiro; Manabe, Yoshihisa.

    1991-01-01

    A main steam safety valve set pressure test is conducted for all valves during every refueling outage in Japan's PWRs. Almost all operations of the test are manually conducted by a skilled worker. In order to obtain further reliability and reduce the test time, an automatic test system using a personnel computer has been developed in accordance with system concept. Quality assurance was investigated to fix system specifications. The prototype of the system was manufactured to confirm the system reliability. The results revealed that this system had high accuracy measurement and no adverse influence on the safety valve. This system was concluded to be applicable for actual use. (author)

  15. Nuclear reactor power supply system

    International Nuclear Information System (INIS)

    Cook, B.M.

    1982-01-01

    The redundant signals from the sensor assemblies measuring the process parameters of a nuclear reactor power supply are transmitted each in its turn to a protection system which operates to actuate the protection apparatus for signals indicating off-process conditions. Each sensor assembly includes a number of like sensors measuring the same parameters. The sets of process signals derived from the sensor assemblies are each in its turn transmitted from the protection system to the control system which impresses control signals on the reactor or its components to counteract the tendency for conditions to drift off-normal status requiring operation of the protection system. A parameter signal selector prevents a parameter signal which differs from the other parameter signals of the set by more than twice the allowable variation from passing to the control system. Test signals are periodically impressed by a test unit on a selected pair of a selection unit and control channels. This arrangement eliminates the possibility that a single component failure which may be spurious will cause an inadvertent trip of the reactor during test. (author)

  16. Vulnerability of steam generator super-emergency feeding. Super-emergency feedwater system for the Mochovce NPP steam-generators

    International Nuclear Information System (INIS)

    Hlasova, M.; Jary, A.

    1997-01-01

    The following major requirements and criteria fulfillment concerned the super-emergency feedwater system (SEFW) system were proposed: to provide sufficient water amount for accident conditions, inclusive seismicity, even during required SEFW system operation for the time period of 72 hours; to analyse ensuring of residual heat removal in case of a station black-out; to state criteria for water supply by the SEFW system into the steam generators (SGs); to simplify the existing connection scheme inclusive decreasing the number of valves, which are in series; to analyse and provide the system protection against a common cause failure, which the SEFW system did not provide in some parts (possibilities of three systems failure due to flooding; vulnerability of all tanks by the operation building fall in case of a seismic event; vulnerability of all tanks due to extreme climatic conditions; vulnerability of all tanks during new seismic loading and consequent mutual endangering; the possibility of three systems failure due to common routing in the vicinity of high; energy media on the +14,7 m floor in the intermediate machinery building and due to inconsistent electrical valves secured power supply systems); to analyse temperature increase impact on the number of uses and lifetime of SGs; to perform a change of SEFW system pipelines routing layout outside the dangerous area of the +14,7 m floor in the intermediate machinery building with high energy media; checking the thanks autonomy. There were performed analyses of selected transient operation modes. The analyses had the following objectives: necessary flowrate of the SEFW in case of the primary side stabilised temperature of 140 C till 72 hours of the process duration; sufficient capacity of one subsystem for the supply of sufficient water amount; sufficient water reserve in the tanks at given conditions; and other. Accident situations were evaluated using an analysis and three characteristic operation modes were

  17. ASTRID power conversion system: Assessment on steam and gas options

    International Nuclear Information System (INIS)

    Laffont, Guy; Cachon, Lionel; Jourdain, Vincent; Fauque, Jean Marie

    2013-01-01

    Conclusion: ◆ Two power conversion systems have been investigated for the ASTRID prototype. ◆ Steam PCS: • Most mature system based on a well-developed turbomachinery technology. • High plant efficiency. • Studies on steam generators designs and leak detection systems in progress with the aim of reducing the risk of large SWRs and of limiting its consequences. • Design and licensing safety assessment of a SFR must deal with the Sodium Water Air reaction (SWAR). ◆ Gas PCS: • Strong advantage as it inherently eliminates the SWR and SWAR risks. • Very innovative option: major breakthroughs but feasibility and viability not yet demonstrated. • Remaining technological challenges but no showstopper indentified. • General architecture: investigations in progress to improve performances, operability and maintainability

  18. Pure intelligent monitoring system for steam economizer trips

    Directory of Open Access Journals (Sweden)

    Basim Ismail Firas

    2017-01-01

    Full Text Available Steam economizer represents one of the main equipment in the power plant. Some steam economizer's behavior lead to failure and shutdown in the entire power plant. This will lead to increase in operating and maintenance cost. By detecting the cause in the early stages maintain normal and safe operational conditions of power plant. However, these methodologies are hard to be achieved due to certain boundaries such as system learning ability and the weakness of the system beyond its domain of expertise. The best solution for these problems, an intelligent modeling system specialized in steam economizer trips have been proposed and coded within MATLAB environment to be as a potential solution to insure a fault detection and diagnosis system (FDD. An integrated plant data preparation framework for 10 trips was studied as framework variables. The most influential operational variables have been trained and validated by adopting Artificial Neural Network (ANN. The Extreme Learning Machine (ELM neural network methodology has been proposed as a major computational intelligent tool in the system. It is shown that ANN can be implemented for monitoring any process faults in thermal power plants. Better speed of learning algorithms by using the Extreme Learning Machine has been approved as well.

  19. Innovative-Simplified Nuclear Power Plant Efficiency Evaluation with High-Efficiency Steam Injector System

    International Nuclear Information System (INIS)

    Shoji, Goto; Shuichi, Ohmori; Michitsugu, Mori

    2006-01-01

    It is possible to establish simplified system with reduced space and total equipment weight using high-efficiency Steam Injectors (SI) instead of low-pressure feedwater heaters in Nuclear Power Plant (NPP). The SI works as a heat exchanger through direct contact between feedwater from condensers and extracted steam from turbines. It can get higher pressure than supplied steam pressure. The maintenance and reliability are still higher than the feedwater ones because SI has no movable parts. This paper describes the analysis of the heat balance, plant efficiency and the operation of this Innovative-Simplified NPP with high-efficiency SI. The plant efficiency and operation are compared with the electric power of 1100 MWe-class BWR system and the Innovative-Simplified BWR system with SI. The SI model is adapted into the heat balance simulator with a simplified model. The results show that plant efficiencies of the Innovated-Simplified BWR system are almost equal to original BWR ones. The present research is one of the projects that are carried out by Tokyo Electric Power Company, Toshiba Corporation, and six Universities in Japan, funded from the Institute of Applied Energy (IAE) of Japan as the national public research-funded program. (authors)

  20. Design of fault tolerant control system for steam generator using

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Myung Ki; Seo, Mi Ro [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1998-12-31

    A controller and sensor fault tolerant system for a steam generator is designed with fuzzy logic. A structure of the proposed fault tolerant redundant system is composed of a supervisor and two fuzzy weighting modulators. A supervisor alternatively checks a controller and a sensor induced performances to identify which part, a controller or a sensor, is faulty. In order to analyze controller induced performance both an error and a change in error of the system output are chosen as fuzzy variables. The fuzzy logic for a sensor induced performance uses two variables : a deviation between two sensor outputs and its frequency. Fuzzy weighting modulator generates an output signal compensated for faulty input signal. Simulations show that the proposed fault tolerant control scheme for a steam generator regulates well water level by suppressing fault effect of either controllers or sensors. Therefore through duplicating sensors and controllers with the proposed fault tolerant scheme, both a reliability of a steam generator control and sensor system and that of a power plant increase even more. 2 refs., 9 figs., 1 tab. (Author)

  1. What is geothermal steam worth?

    International Nuclear Information System (INIS)

    Thorhallsson, S.; Ragnarsson, A.

    1992-01-01

    Geothermal steam is obtained from high-temperature boreholes, either directly from the reservoir or by flashing. The value of geothermal steam is similar to that of steam produced in boilers and lies in its ability to do work in heat engines such as turbines and to supply heat for a wide range of uses. In isolated cases the steam can be used as a source of chemicals, for example the production of carbon dioxide. Once the saturated steam has been separated from the water, it can be transported without further treatment to the end user. There are several constraints on its use set by the temperature of the reservoir and the chemical composition of the reservoir fluid. These constraints are described (temperature of steam, scaling in water phase, gas content of steam, well output) as are the methods that have been adopted to utilize this source of energy successfully. Steam can only be transported over relatively short distances (a few km) and thus has to be used close to the source. Examples are given of the pressure drop and sizing of steam mains for pipelines. The path of the steam from the reservoir to the end user is traced and typical cost figures given for each part of the system. The production cost of geothermal steam is estimated and its sensitivity to site-specific conditions discussed. Optimum energy recovery and efficiency is important as is optimizing costs. The paper will treat the steam supply system as a whole, from the reservoir to the end user, and give examples of how the site-specific conditions and system design have an influence on what geothermal steam is worth from the technical and economic points of view

  2. Aerogel-Based Insulation for Industrial Steam Distribution Systems

    Energy Technology Data Exchange (ETDEWEB)

    John Williams

    2011-03-30

    Thermal losses in industrial steam distribution systems account for 977 trillion Btu/year in the US, more than 1% of total domestic energy consumption. Aspen Aerogels worked with Department of Energy’s Industrial Technologies Program to specify, develop, scale-up, demonstrate, and deliver Pyrogel XT®, an aerogel-based pipe insulation, to market to reduce energy losses in industrial steam systems. The product developed has become Aspen’s best selling flexible aerogel blanket insulation and has led to over 60 new jobs. Additionally, this product has delivered more than ~0.7 TBTU of domestic energy savings to date, and could produce annual energy savings of 149 TBTU by 2030. Pyrogel XT’s commercial success has been driven by it’s 2-4X better thermal performance, improved durability, greater resistance to corrosion under insulation (CUI), and faster installation times than incumbent insulation materials.

  3. Design and performance of BWC replacement steam generators for PWR systems

    Energy Technology Data Exchange (ETDEWEB)

    Klarner, R.; Steinmoeller, F.; Millman, J.; Schneider, W. [Babcock and Wilcox Canada, Cambridge, Ontario (Canada)

    1998-07-01

    In recent years, Babcock and Wilcox Canada (BWC) has provided a number of PWR Replacement Steam Generators (RSGS) to replace units that had experienced extensive Alloy 600 tube degradation. BWC RSG units are in operation at Northeast Utilities' Millstone Unit 2, Rochester Gas and Electric's Ginna Station, Duke Energy's Catawba Unit 1, McGuire Unit 1 and 2, Florida Power and Light's St. Lucie Unit 1 and Commonwealth Edison's Byron 1 Station. Extensive start-up performance characteristics have been obtained for Millstone 2, Ginna, McGuire 1, and Catawba 1 RSGS. The Millstone 2, Ginna and Catawba 1 RSGs have also undergone extensive inspections following their first cycle of operation. The design and start-up performance characteristics of these RSGs are presented. The BWC Replacement Steam generators were designed to fit the existing envelope of pressure boundary dimensions to ensure licensability and integration into the Nuclear Steam Supply System. The RSGs were provided with a tube bundle of Alloy 690TT tubing, sized to match or exceed the original steam generator (OSG) thermal performance including provision for the reduced thermal conductivity of Alloy 690 relative to Alloy 600. The RSG tube bundle configurations provide a higher circulation design relative to the OSG, and feature corrosion resistant lattice grid and U-bend tube supports which provide effective anti-vibration support. The tube bundle supports accommodate relatively unobstructed flow and allow unrestrained structural interactions during thermal transients. Efficient steam separators assure low moisture carryover as well as high circulation. Performance measurements obtained during start-up verify that the BWC RSGs meet or exceed the specified thermal and moisture carryover performance requirements. RSG water level stability results at nor-mal operation and during plant transients have been excellent. Visual and ECT inspections have confirmed minimal deposition and 100

  4. Design and performance of BWC replacement steam generators for PWR systems

    International Nuclear Information System (INIS)

    Klarner, R.; Steinmoeller, F.; Millman, J.; Schneider, W.

    1998-01-01

    In recent years, Babcock and Wilcox Canada (BWC) has provided a number of PWR Replacement Steam Generators (RSGS) to replace units that had experienced extensive Alloy 600 tube degradation. BWC RSG units are in operation at Northeast Utilities' Millstone Unit 2, Rochester Gas and Electric's Ginna Station, Duke Energy's Catawba Unit 1, McGuire Unit 1 and 2, Florida Power and Light's St. Lucie Unit 1 and Commonwealth Edison's Byron 1 Station. Extensive start-up performance characteristics have been obtained for Millstone 2, Ginna, McGuire 1, and Catawba 1 RSGS. The Millstone 2, Ginna and Catawba 1 RSGs have also undergone extensive inspections following their first cycle of operation. The design and start-up performance characteristics of these RSGs are presented. The BWC Replacement Steam generators were designed to fit the existing envelope of pressure boundary dimensions to ensure licensability and integration into the Nuclear Steam Supply System. The RSGs were provided with a tube bundle of Alloy 690TT tubing, sized to match or exceed the original steam generator (OSG) thermal performance including provision for the reduced thermal conductivity of Alloy 690 relative to Alloy 600. The RSG tube bundle configurations provide a higher circulation design relative to the OSG, and feature corrosion resistant lattice grid and U-bend tube supports which provide effective anti-vibration support. The tube bundle supports accommodate relatively unobstructed flow and allow unrestrained structural interactions during thermal transients. Efficient steam separators assure low moisture carryover as well as high circulation. Performance measurements obtained during start-up verify that the BWC RSGs meet or exceed the specified thermal and moisture carryover performance requirements. RSG water level stability results at nor-mal operation and during plant transients have been excellent. Visual and ECT inspections have confirmed minimal deposition and 100% tube integrity following

  5. PROFIL-360 high resolution steam generator tube profilometry system

    International Nuclear Information System (INIS)

    Glass, S.W.

    1985-01-01

    A high-resolution profilometry system, PROFIL 360, has been developed to assess the condition of steam generator tubes and rapidly produce the data to evaluate the potential for developing in-service leaks. The probe has an electromechanical sensor in a rotating head. This technique has been demonstrated in the field, saving tubes that would have been plugged with the go-gauge criterion and indicating plugging other high-risk candidates that might otherwise not have been removed from service

  6. Profil-360 high resolution steam generator tube profilometry system

    International Nuclear Information System (INIS)

    Glass, S.W.

    1985-01-01

    A high-resolution profilometry system, PROFIL 360, has been developed to assess the condition of steam generator tubes and rapidly produce the data to evaluate the potential for developing in-service leaks. The probe has an electromechanical sensor in a rotating head. This technique has been demonstrated in the field, saving tubes that would have been plugged with the go-gauge criterion and indicating plugging other high-risk candidates that might otherwise not have been removed from service

  7. Numerical investigation of passive heat removal system via steam generator in VVER 1200

    International Nuclear Information System (INIS)

    Dinh Anh Tuan; Duong Thanh Tung; Tran Chi Thanh; Nguyen Van Thai

    2015-01-01

    Passive heat removal system (PHRS) via Steam Generator is an important part in VVER design. In case of Design Basic Accidents such as blackout, failure of feed water supply to steam generator or coolant leakage with failure of emergency core cooling at high pressure. PHRS is designed to remove the residual heat from reactor core through steam generator to heat exchanger which is placed outside reactor vessel. In order to evaluate the passive system, a numerical investigation using a CFD code is performed. However, PHRS has complex geometry for using CFD simulation. Thus, RELAP5 is applied to provide the wall heat flux of tube in the heat exchanger tank. The natural convection in the heat exchanger tank is investigated in this report. Numerical results show temperature and velocity distribution in the heat exchanger tank are calculated with different wall heat flux corresponding to various transient conditions. The calculated results contribute to the capacity analysis of passive heat removal system and giving valuable information for safe operation of VVER 1200. (author)

  8. Screening reactor steam/water piping systems for water hammer

    International Nuclear Information System (INIS)

    Griffith, P.

    1997-09-01

    A steam/water system possessing a certain combination of thermal, hydraulic and operational states, can, in certain geometries, lead to a steam bubble collapse induced water hammer. These states, operations, and geometries are identified. A procedure that can be used for identifying whether an unbuilt reactor system is prone to water hammer is proposed. For the most common water hammer, steam bubble collapse induced water hammer, six conditions must be met in order for one to occur. These are: (1) the pipe must be almost horizontal; (2) the subcooling must be greater than 20 C; (3) the L/D must be greater than 24; (4) the velocity must be low enough so that the pipe does not run full, i.e., the Froude number must be less than one; (5) there should be void nearby; (6) the pressure must be high enough so that significant damage occurs, that is the pressure should be above 10 atmospheres. Recommendations on how to avoid this kind of water hammer in both the design and the operation of the reactor system are made

  9. Reverse osmosis using for water demineralization for supplying the NPP and TPP steam generators

    International Nuclear Information System (INIS)

    Mamet, A.P.; Sitnyakovskij, Yu.A.

    2000-01-01

    Paper analyzes the conditions affecting the efficiency of water reverse-osmosis demineralization for NPP and TPP steam generators and presents an example of efficient application of a membrane reverse-osmosis facility serving as the first stage of water demineralization at the Mosehnergo Joint-Stock Company heating and power plant no. 23 to feed boilers [ru

  10. French experience in transient data collection and fatigue monitoring of PWR`s nuclear steam supply system; Experience francaise sur la comptabilisation des transitoires et la surveillance en fatigue des chaudieres REP

    Energy Technology Data Exchange (ETDEWEB)

    Sabaton, M.; Morilhat, P.; Savoldelli, D.; Genette, P.

    1995-10-01

    Electricite de France (EDF), the french national electricity company, is operating 54 standardized pressurizer water reactors. This about 500 reactor-years experience in nuclear stations operation and maintenance area has allowed EDF to develop its own strategy for monitoring of age-related degradations of NPP systems and components relevant for plant safety and reliability. After more than fifteen years of experience in regulatory transient data collection and seven years of successful fatigue monitoring prototypes experimentation, EDF decided to design a new system called SYSFAC (acronym for SYsteme de Surveillance en FAtigue de la Chaudiere) devoted to transient logging and thermal fatigue monitoring of the reactor coolant pressure boundary. The system is fully automatic and directly connected to the on-site data acquisition network without any complementary instrumentation. A functional transient detection module and a mechanical transient detection module are in charge of the general transient data collection. A fatigue monitoring module is aimed towards a precise surveillance of five specific zones particularly sensible to thermal fatigue. After the first step of preliminary studies, the industrial phase of the SYSFAC project is currently going on, with hardware and software tests and implementation. The first SYSFAC system will be delivered to the pilot power plant by the beginning of 1996. The extension to all EDF`s nuclear 900 MW is planned after one more year of feedback experience. (authors). 12 refs., 3 figs.

  11. On synthesis and optimization of steam system networks. 3. Pressure drop consideration

    CSIR Research Space (South Africa)

    Price, T

    2010-08-01

    Full Text Available Heat exchanger networks in steam systems are traditionally designed to operate in parallel. Coetzee and Majozi (Ind. Eng. Chem. Res. 2008, 47, 4405-4413) found that by reusing steam condensate within the network the steam flow rate could be reduced...

  12. Synthesis and optimization of steam system networks. 2. Multiple steam levels

    CSIR Research Space (South Africa)

    Price, T

    2010-08-01

    Full Text Available The use of steam in heat exchanger networks (HENs) can be reduced by the application of heat integration with the intention of debottlenecking the steam boiler and indirectly reducing the water requirement [Coetzee and Majozi. Ind. Eng. Chem. Res...

  13. Influence of feedwater and blowdown systems on the mineral distribution in WWER steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Papp, L. [Inst. of Material Engineering, Ostrava (Switzerland)

    1995-12-31

    After modification of Dukovany NPP steam generator (SG) feedwater system, the increased concentration of minerals was measured in the cold leg of modified SG. Some modifications were performed on operating WWER 1000 steam generators with aim to optimize the water chemistry in the collectors area. Since the distribution of minerals can substantially affect on corrosion processes in steam generators, VITKOVICE, as a producer of WWER steam generators has focused the attention to the optimizing of these systems. To predict the mineral distribution on the secondary side of steam generators for considered feedwater/blowdown systems, the simple model of the flow distribution in the secondary side of SG was developed.

  14. Influence of feedwater and blowdown systems on the mineral distribution in WWER steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Papp, L [Inst. of Material Engineering, Ostrava (Switzerland)

    1996-12-31

    After modification of Dukovany NPP steam generator (SG) feedwater system, the increased concentration of minerals was measured in the cold leg of modified SG. Some modifications were performed on operating WWER 1000 steam generators with aim to optimize the water chemistry in the collectors area. Since the distribution of minerals can substantially affect on corrosion processes in steam generators, VITKOVICE, as a producer of WWER steam generators has focused the attention to the optimizing of these systems. To predict the mineral distribution on the secondary side of steam generators for considered feedwater/blowdown systems, the simple model of the flow distribution in the secondary side of SG was developed.

  15. Influence of feedwater and blowdown systems on the mineral distribution in WWER steam generators

    International Nuclear Information System (INIS)

    Papp, L.

    1995-01-01

    After modification of Dukovany NPP steam generator (SG) feedwater system, the increased concentration of minerals was measured in the cold leg of modified SG. Some modifications were performed on operating WWER 1000 steam generators with aim to optimize the water chemistry in the collectors area. Since the distribution of minerals can substantially affect on corrosion processes in steam generators, VITKOVICE, as a producer of WWER steam generators has focused the attention to the optimizing of these systems. To predict the mineral distribution on the secondary side of steam generators for considered feedwater/blowdown systems, the simple model of the flow distribution in the secondary side of SG was developed

  16. Latest condition of the steam coal market and outlook for supply cost

    Energy Technology Data Exchange (ETDEWEB)

    Murase, A.

    1988-11-01

    The following factors affecting coal prices are identified: rises in the prices of fuels which compete with coal, especially petroleum; the supply cost of coal; coal supply and demand; the balance of power between sellers and buyers; and foreign exchange rates. Coal supply costs are discussed. 5 figs.

  17. Ternary Systems Control with Two Recycle Steams

    Directory of Open Access Journals (Sweden)

    Solar–González R

    2010-10-01

    Full Text Available In the literature, the use of parallel control structure to improve the control behavior of plantwide de signs has been study. In this work, we consider the behavior of a plant that consists of a recycle system, a reactor and two distillation columns where the control aim is to improve the disturbance rejection capabilities of the controlled process. The idea is to change the operating conditions in both the reactor and the second distillation column in order to distribute the composition control effort in the face of fresh feed composition disturbances. To this end, a parallel control structure is proposed where the product composition is regulated by means of simultaneous feed back manipulations of the vapor boilup rate of the second column and there actor temperature. In this way, the use of the reactor temperature as a secondary control in put reduces oscillatory behavior and the vapour flowrate us age.

  18. Water treatment in the EBR-II steam system

    International Nuclear Information System (INIS)

    Klein, M.A.; Hurst, H.

    1975-01-01

    Boiler-water treatment in the EBR-II steam system consists of demineralizing makeup water and using hydrazine to remove traces of oxygen and morpholine to adjust pH to 8.8-9.2. This treatment is called a ''zero-solids'' method, because the chemical agents and reaction products are either volatile or form water and do not contribute solids to the boiler water. A continuous blowdown is cooled, filtered, and deionized to remove impurities and maintain high purity of the water. If a cooling-water leak occurs, phosphate is added to control scaling, and the ''zero-solids'' eatment is suspended until the leak is repaired. Water streams are sampled at six points to control water purity. Examination of the steam drum and an evaporator show the metal surfaces to be in excellent condition with minimal corrosion. The EBR-II steam-generating plant has accumulated over 85,000 hours of in-service operation and has operated successfully for over ten years with the ''zero-solids'' treatment. (auth)

  19. Cleaning device for steam units in a nuclear power plant

    International Nuclear Information System (INIS)

    Sasamuro, Takemi.

    1978-01-01

    Purpose: To prevent radioactive contamination upon dismantling and inspection of steam units such as a turbine to a building containing such units and the peripheral area. Constitution: A steam generator indirectly heated by steam supplied from steam generating source in a separate system containing no radioactivity is provided to produce cleaning steam. A cleaning steam pipe is connected by way of a stop valve between separation valve of a nuclear power plant steam pipe and a high pressure turbine. Upon cleaning, the separation valve is closed, and steam supplied from the cleaning steam pipe is flown into a condenser. The water thus condensated is returned by way of a feed water heater and a condenser to a water storage tank. (Nakamura, S.)

  20. Imitative modeling automatic system Control of steam pressure in the main steam collector with the influence on the main Servomotor steam turbine

    Science.gov (United States)

    Andriushin, A. V.; Zverkov, V. P.; Kuzishchin, V. F.; Ryzhkov, O. S.; Sabanin, V. R.

    2017-11-01

    The research and setting results of steam pressure in the main steam collector “Do itself” automatic control system (ACS) with high-speed feedback on steam pressure in the turbine regulating stage are presented. The ACS setup is performed on the simulation model of the controlled object developed for this purpose with load-dependent static and dynamic characteristics and a non-linear control algorithm with pulse control of the turbine main servomotor. A method for tuning nonlinear ACS with a numerical algorithm for multiparametric optimization and a procedure for separate dynamic adjustment of control devices in a two-loop ACS are proposed and implemented. It is shown that the nonlinear ACS adjusted with the proposed method with the regulators constant parameters ensures reliable and high-quality operation without the occurrence of oscillations in the transient processes the operating range of the turbine loads.

  1. Simulation of main steam and feedwater system of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Zhao Xiaoyu

    1996-01-01

    The simulation of main steam and feedwater system is the most important and maximal part in secondary circuit model, including all of main steam and feedwater's thermal-hydraulic properties, except heat-exchange of secondary side of steam generator. It simulates main steam header, steam power in each stage of turbine, moisture separator-reheater, deaerator, condenser, high pressure and low pressure heater, auxiliary feedwater and main steam bypass in full scope

  2. Steam relief valve control system for a nuclear reactor

    International Nuclear Information System (INIS)

    Torres, J.M.

    1976-01-01

    Described is a turbine follow system and method for Pressurized Water Reactors utilizing load bypass and/or atmospheric dump valves to provide a substitute load upon load rejection by bypassing excess steam to a condenser and/or to the atmosphere. The system generates a variable pressure setpoint as a function of load and applies an error signal to modulate the load bypass valves. The same signal which operates the bypass valves actuates a control rod automatic withdrawal prevent to insure against reactor overpower

  3. An integrated leak detection system for the ALMR steam generator

    International Nuclear Information System (INIS)

    Dayal, Y.; Gaubatz, D.C.; Wong, K.K.; Greene, D.A.

    1995-01-01

    The steam generator (SG) of the Advanced Liquid Metal Reactor (ALMR) system serves as a heat exchanger between the shell side secondary loop hot liquid sodium and the tube side water/steam mixture. A leak in the tube will result in the injection of the higher pressure water/steam into the sodium and cause an exothermic sodium-water reaction. An initial small leak (less than 1 gm/sec) can escalate into an intermediate size leak in a relatively short time by self enlargement of the original flaw and by initiating leaks in neighboring tubes. If not stopped, complete rupture of one or more tubes can cause injection rates of thousands of gm/sec and result in the over pressurization of the secondary loop rupture disk and dumping of the sodium to relieve pressure. The down time associated with severe sodium-water reaction damage has great adverse economic consequence. An integrated leak detection system (ILDS) has been developed which utilizes both chemical and acoustic sensors for improved leak detection. The system provides SG leak status to the reactor operator and is reliable enough to trigger automatic control action to protect the SG. The ILDS chemical subsystem uses conventional in-sodium and cover gas hydrogen detectors and incorporates knowledge based effects due to process parameters for improved reliability. The ILDS acoustic subsystem uses an array of acoustic sensors and incorporates acoustic beamforming technology for highly reliable and accurate leak identification and location. The new ILDS combines the small leak detection capability of the chemical system with the reliability and rapid detection/location capability of the acoustic system to provide a significantly improved level of protection for the SG over a wide range of operation conditions. (author)

  4. Steam feeding redundancy for turbine-drives of feed pumps at WWER-1000 NPP

    International Nuclear Information System (INIS)

    Nesterov, Yu.V.; Shmukler, B.I.

    1987-01-01

    The system of steam supply for feed pump driving turbines (T) at the South Ukrainian Unit 1 according to the centralized redundancy principle is described. T is feeded through the collector of water auxiliary sytem (CWAS) to which steam from the third steam extraction line of turbine is supplied under thenormal regime. Under the reduction of turbine load, live steam from the steam generator is supplied to CWAS through the pressure regulator, possesing 10 s speed of responce. In this case the level reduction in the steam generator makes up 170 mm

  5. Functional performance of the helical coil steam generator, Consolidated Nuclear Steam Generator (CNSG) IV system. Executive summary report

    International Nuclear Information System (INIS)

    Watson, G.B.

    1975-10-01

    The objective of this project was to study the functional performance of the CNSG - IV helical steam generator to demonstrate that the generator meets steady-state and transient thermal-hydraulic performance specifications and that secondary flow instability will not be a problem. Economic success of the CNSG concepts depends to a great extent on minimizing the size of the steam generator and the reactor vessel for ship installation. Also, for marine application the system must meet stringent specifications for operating stability, transient response, and control. The full-size two-tube experimental unit differed from the CNSG only in the number of tubes and the mode of primary flow. In general, the functional performance test demonstrated that the helical steam generator concept will exceed the specified superheat of 35F at 100% load. The experimental measured superheat at comparable operating conditions was 95F. Testing also revealed that available computer codes accurately predict trends and overall performance characteristics

  6. Innovated feed water distributing system of VVER steam generators

    International Nuclear Information System (INIS)

    Matal, O.; Sousek, P.; Simo, T.; Lehota, M.; Lipka, J.; Slugen, V.

    2000-01-01

    Defects in feed water distributing system due to corrosion-erosion effects have been observed at many VVER 440 steam generators (SG). Therefore analysis of defects origin and consequently design development and testing of a new feed water distributing system were performed. System tests in-situ supported by calculations and comparison of measured and calculated data were focused on demonstration of long term reliable operation, definition of water flow and water chemical characteristics at the SG secondary side and their measurements and study of dynamic characteristics needed for the innovated feed water distributing system seismic features approval. The innovated feed water distributing system was installed in the SGs of two VVER units already. (author)

  7. Risk-based and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, K.; Nagai, S.; Akikuni, Y.; Fujiwara, T.; Furuya, K.; Matsumoto, S.; Takagi, K.; Kawabata, T.

    2003-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants. (orig.)

  8. Risk-based inspection and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, Kazunari; Nagai, Satoshi; Akikuni, Yasunari; Fujiwara, Toshihiro; Furuya, Kenichiro; Matsumoto, Shigeru; Takagi, Kentaro; Kawabata, Taro

    2004-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants

  9. Reconstruction of Low Pressure Gas Supply System

    Directory of Open Access Journals (Sweden)

    S. N. Osipov

    2013-01-01

    Full Text Available The current reconstruction of residential areas in large cities especially with the developed heat-supply systems from thermal power stations and reduction of heat consumption for heating due to higher thermal resistance of building enclosing structures requires new technical solutions in respect of gas-supply problems. While making reconstruction of a gas-supply system of the modernized or new buildings in the operating zone of one gas-distribution plant it is necessary to change hot water-supply systems from gas direct-flow water heaters to centralized heat-supply and free gas volumes are to be used for other needs or gas-supply of new buildings with the current external gas distribution network.Selection of additional gas-line sections and points of gas-supply systems pertaining to new and reconstructed buildings for their connection to the current distribution system of gas-supply is to be executed in accordance with the presented methodology.

  10. TEXT poloidal coil systems power supplies

    International Nuclear Information System (INIS)

    Hutchins, S.H.; Brower, D.F.

    1977-01-01

    TEXT is a convertional iron core tokamak which will have a toroidal field of 3.0 Tesla produced by room temperature copper coils and a maximum plasma current pulse of 400 kA induced by a 40 turn Ohmic Heating coil. The major radius is 100 cm and the minor radius of the plasma is 28 cm. The machine is intended for basic research in tokamak plasma physics and atomic physics and is designed primarily to provide a stable hot plasma, extremely good diagnostic access, and reliable operation. The discharge pulse length will be 300 msec and the repetition period 120 seconds. Power for the toroidal field coils and for the ohmic heating supply is provided by a 100 MVA energy storage alternator. The vertical field, horizontal field, fast positioning, and discharge cleaning power supply systems are powered from the Tokamak Laboratory power mains. The ohmic heating power system consists of an SCR controlled premagnetizing supply and commutation circuit, the main ohmic heating capacitor bank to provide plasma breakdown and current rise, and an SCR controlled power supply which sustains plasma current during the 300 ms pulse. The vertical field power system uses a small capacitor bank and an SCR controlled supply. The horizontal field has a reversible SCR controlled supply, and the fast positioning coils are powered by bipolar output transistor controlled supplies. This paper describes the loads, required wave forms, and the specifications for these power supply systems

  11. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  12. Water and steam sampling systems; Provtagningssystem foer vatten och aanga

    Energy Technology Data Exchange (ETDEWEB)

    Hellman, Mats

    2009-10-15

    The supervision of cycle chemistry can be divided into two parts, the sampling system and the chemical analysis. In modern steam generating plants most of the chemical analyses are carried out on-line. The detection limits of these analyzers are pushed downward to the ppt-range (parts per trillion), however the analyses are not more correct than the accuracy of the sampling system. A lot of attention has been put to the analyzers and the statistics to interpret the results but the sampling procedures has gained much less attention. This report aims to give guidance of the considerations to be made regarding sampling systems. Sampling is necessary since most analysis of interesting parameters cannot be carried out in- situ on-line in the steam cycle. Today's on-line instruments for pH, conductivity, silica etc. are designed to meet a water sample at a temperature of 10-30 deg C. This means that the sampling system has to extract a representative sample from the process, transport and cool it down to room temperature without changing the characteristics of the fluid. In the literature research work, standards and other reports can be found. Although giving similar recommendations in most aspects there are some discrepancies that may be confusing. This report covers all parts in the sampling system: Sample points and nozzles; Sample lines; Valves, regulating and on-off; Sample coolers; Temperature, pressure and flow rate control; Cooling water; and Water recovery. On-line analyzers connecting to the sampling system are not covered. This report aims to clarify what guidelines are most appropriate amongst the existing ones. The report should also give guidance to the design of the sampling system in order to achieve representative samples. In addition to this the report gives an overview of the fluid mechanics involved in sampling. The target group of this report is owners and operators of steam generators, vendors of power plant equipment, consultants working in

  13. Nuclear power plant steam pipes repairing with TIRANT 3 robot system

    International Nuclear Information System (INIS)

    Soto Tomas, Marcelo; Curiel Nieva, Marceliano; Monzo Blasco, Enrique; Rodriguez, Salvador Pineda; Vaquer Perez, Juan I.

    2011-01-01

    A typical application functions covering the steam pipes inner surface in coal-fired power station and nuclear power plants. The results of this process are spectacular in terms of protection against corrosion and abrasion, but its application has conditioning factors, such as: Severe application conditions for workers. Due to the postural position (usually kneeling) in small diameter pipes and working with fireproof clothing and masks with outdoor air supplying, due to fumes, sparks and molten metal particles, radiological contamination, confined space, poor lighting... Coating uniformity. As metallization is a manual process, the carried out measurements show small variations in the thickness of the coating, always within the tolerance limits established by the applicable regulations and quality assurance. For all these reasons, Grupo Dominguis has developed the TIRANT 3 robot, a worldwide innovative system, for metallization of steam pipes inner surface. TIRANT 3 robot is teleoperated from outside of the pipe, so that human intervention is reduced to the operations of robot positioning and change of metallization wire. As it is an independent system of the human factor, metallization process performance is significantly increased by reducing rest periods due only to the robot maintenance. Likewise, TIRANT 3 system permits to increase resulting coating uniformity, and thus its resistance, keeping selected parameters constant depending on required type and thickness of wire. TIRANT 3 system has successfully worked in 2010 during the stops refueling of the Units I and II of Laguna Verde nuclear power plant in Mexico. (author)

  14. Reliability study: steam generation and distribution system, Portsmouth Gaseous Diffusion Plant

    International Nuclear Information System (INIS)

    Baker, F.E.; Davis, E.L.; Dent, J.T.; Walters, D.E.; West, R.M.

    1982-10-01

    A reliability study for determining the ability of the Steam Generation and Distribution System to provide reliable and adequate service through the year 2000 has been completed. This study includes an evaluation of the X-600 Steam Plant and the steam distribution system. The Steam Generation and Distribution System is in good overall condition, but to maintain this condition, the reliability study team made twelve recommendations. Eight of the recommendations are for repair or replacement of existing equipment and have a total estimated cost of $540,000. The other four recommendations are for additional testing, new procedure implementation, or continued investigations

  15. Dual turbine power plant and method of operating such plant, especially one having an HTGR steam supply

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegtnes, K.O.

    1977-01-01

    A power plant including dual steam turbine-generators connected to pass superheat and reheat steam from a steam generator which derives heat from the coolant gas of a high temperature gas-cooled nuclear reactor is described. Associated with each turbine is a bypass line to conduct superheat steam in parallel with a high pressure turbine portion, and a bypass line to conduct superheat steam in parallel with a lower pressure turbine portion. Auxiliary steam turbines pass a portion of the steam flow to the reheater of the steam generator and drive gas blowers which circulate the coolant gas through the reactor and the steam source. Apparatus and method are disclosed for loading or unloading a turbine-generator while the other produces a steady power output. During such loading or unloading, the steam flows through the turbine portions are coordinated with the steam flows through the bypass lines for protection of the steam generator, and the pressure of reheated steam is regulated for improved performance of the gas blowers. 33 claims, 5 figures

  16. Lessons learned while implementing a safety parameter display system at the Comanche Peak steam electric station

    International Nuclear Information System (INIS)

    Hagar, B.

    1987-01-01

    With the completion of site Verification and Validation tests, the Safety Parameter Display System (SPDS) will be fully operational at the Comanche Peak Steam Electric Station. Implementation of the SPDS, which began in 1982, included: modifying generic Safety Assessment System Software; developing site-specific displays and features; installing and integrating system equipment into the plant; modifying station heating, ventilation, and air conditioning systems to provide necessary cooling; installing an additional uninterruptible power supply system to provide necessary power; and training station personnel in the operation and use of the system. Lessons learned during this project can be discussed in terms of an ideal SPDS implementation project. Such a project would design and implement an SPDS for a plant that is already under construction or operating, and would progress through a sequence of activities that includes: (1) developing and documenting the system design bases, and including all major design influences; (2) developing a database description and system functional specifications to clarify specific system requirements; (3) developing detailed system hardware and software design specifications to fully describe the system, and to enable identification of necessary site design changes early in the project; (4) implementing the system design; (5) configuring and extensively testing the system prior to routine system operation; and (6) tuning the system after the completion of system installation. The ideal project would include future system users in design development and system testing, and would use Verification and Validation techniques throughout the project to ensure that each sequential step is appropriate and correct

  17. The development of a new steam generator leak monitoring system

    International Nuclear Information System (INIS)

    Ding Shengyao; Xu Kun; Huang Xiaojian; Wang Peiliang; Nie Jing

    2006-01-01

    The principle idea for the monitoring system is based on the time is different when radiation nuclei 16 N and 19 O travel the different distances from reactor center via hot, bend and cold point of U-tube in steam generator. Because of the decay time T 1/2 for 16 N and 19 O are different, the ratios of 16 N and 19 O activities are different too. By using the different ratio, the authors can obtain the leak location of U-tube. The radioactivities and their ratio of 16 N to 19 O in our swimming pool reactor were measurement by use the monitoring system, the measured results show its quality is reliable. (authors)

  18. Nuclear Power Plant Steam Pipes repairing with Tirant 3R Robot System

    International Nuclear Information System (INIS)

    Ruiz-Martinez, Jose-Tomas; Soto-Tomas, Marcelo; Curiel-Nieva, Marceliano; Monzo-Blasco, Enrique; Pineda-Rodriguez, Salvador; Vaquer-Perez, Juan-Ignacio

    2012-09-01

    The metallization arc spray process is based on the projection of molten metal, supplied by means of different stainless alloys wire, over a surface of carbon steel usually, with the object of serving as protection against flow assisted corrosion (FAC), increasing resistance to abrasion and deteriorations. A typical application functions covering the steam pipes inner surface in Coal-fired power station and Nuclear Power Plants. The results of this process are spectacular in terms of protection against flow assisted corrosion and abrasion, but its application has conditioning factors, such as: Severe application conditions for workers. Due to the worker's postural position (usually kneeling) in 32' diameter pipes and working with fireproof clothing and masks with outdoor air supplying, due to fumes, sparks and molten metal particles, radiological contamination, confined space, poor lighting... Coating uniformity. As metallization is a manual process, the carried out measurements show small variations in the thickness of the coating, always within the tolerance limits established by the applicable regulations and Quality Assurance. An increase in the uniformity of the projected coating, increase the resistance and give a better surface protection. For all these reasons, Lainsa has developed the TIRANT 3 R system, a worldwide innovative system, for metallization of steam pipes inner surface. TIRANT 3 R system is tele-operated from outside of the pipe, so that human intervention is reduced to the operations of robot positioning and change of metallization wire. As it is an independent system of the human factor, metallization process performance is significantly increased by reducing rest periods due only to the robot maintenance. Likewise, TIRANT 3 R system permits to increase resulting coating uniformity and thus its resistance, keeping selected parameters constant (forward speed, rotation speed and inner surface distance) depending on required type and

  19. Correction of Pressure Drop in Steam and Water System in Performance Test of Boiler

    Science.gov (United States)

    Liu, Jinglong; Zhao, Xianqiao; Hou, Fanjun; Wu, Xiaowu; Wang, Feng; Hu, Zhihong; Yang, Xinsen

    2018-01-01

    Steam and water pressure drop is one of the most important characteristics in the boiler performance test. As the measuring points are not in the guaranteed position and the test condition fluctuation exsits, the pressure drop test of steam and water system has the deviation of measuring point position and the deviation of test running parameter. In order to get accurate pressure drop of steam and water system, the corresponding correction should be carried out. This paper introduces the correction method of steam and water pressure drop in boiler performance test.

  20. Energy costs and Portland water supply system

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, W.M.; Hawley, R.P.

    1981-10-01

    The changing role of electrical energy on the Portland, Oregon, municipal-water-supply system is presented. Portland's actions in energy conservation include improved operating procedures, pump modifications, and modifications to the water system to eliminate pumping. Portland is implementing a small hydroelectric project at existing water-supply dams to produce an additional source of power for the area. Special precautions in construction and operation are necessary to protect the high quality of the water supply. 2 references, 7 figures.

  1. New supply for canyon fire foam system

    International Nuclear Information System (INIS)

    Gainey, T.

    1995-01-01

    The raw water supply for the B-Plant Canyon fire foam system is being replaced. The 4 inche water supply line to the foam system is being rerouted from the 6 inches raw water line in the Pipe Gallery to the 10 inches raw water main in the Operating Gallery. This document states the acceptance criteria for the flushing and testing to be performed by the contractor

  2. System for combustion of sunflower shells in industrial steam generators

    International Nuclear Information System (INIS)

    Todoriev, Kh.

    2000-01-01

    The paper presents an economically efficient solution for reconstruction of steam generators with steam production over 5 t/h using foregoing cyclone chamber for sunflower shells combustion. For average fuel caloricity 9 445 ccal/kg and sunflower shells caloricity between 3 485 and 3 750 ccal/kg, the petroleum saving is 68.78% for an average boiler efficiency 4.6 t/h steam

  3. Measure Guideline. Steam System Balancing and Tuning for Multifamily Residential Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Jayne [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States); Ludwig, Peter [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States); Brand, Larry [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States)

    2013-04-01

    This guideline provides building owners, professionals involved in multifamily audits, and contractors insights for improving the balance and tuning of steam systems. It provides readers an overview of one-pipe steam heating systems, guidelines for evaluating steam systems, typical costs and savings, and guidelines for ensuring quality installations. It also directs readers to additional resources for details not included here. Measures for balancing a distribution system that are covered include replacing main line vents and upgrading radiator vents. Also included is a discussion on upgrading boiler controls and the importance of tuning the settings on new or existing boiler controls. The guideline focuses on one-pipe steam systems, though many of the assessment methods can be generalized to two-pipe steam systems.

  4. Research on simulation of supercritical steam turbine system in large thermal power station

    Science.gov (United States)

    Zhou, Qiongyang

    2018-04-01

    In order to improve the stability and safety of supercritical steam turbine system operation in large thermal power station, the body of the steam turbine is modeled in this paper. And in accordance with the hierarchical modeling idea, the steam turbine body model, condensing system model, deaeration system model and regenerative system model are combined to build a simulation model of steam turbine system according to the connection relationship of each subsystem of steam turbine. Finally, the correctness of the model is verified by design and operation data of the 600MW supercritical unit. The results show that the maximum simulation error of the model is 2.15%, which meets the requirements of the engineering. This research provides a platform for the research on the variable operating conditions of the turbine system, and lays a foundation for the construction of the whole plant model of the thermal power plant.

  5. Nuclear power plant steam pipes repairing with Tirant 3 Robot system

    Energy Technology Data Exchange (ETDEWEB)

    Soto, M.; Curiel, M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Lazaro, F. [Revestimientos Anticorrosivos Industriales, S. L. U., Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Arnaldos, A., E-mail: m.soto@lainsa.co [TITANIA Servicios Tecnologicos SL, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain)

    2010-10-15

    The metallization arc spray process is based on the projection of molten metal, supplied by means of different stainless alloys wire, over a surface of carbon steel usually, with the object of serving as protection against erosion-corrosion, increasing resistance to abrasion and detrition. A typical application functions covering the steam pipes inner surface in coal-fired power station and nuclear power plants. The results of this process are spectacular in terms of protection against corrosion and abrasion, but its application has conditioning factors, such as: Severe application conditions for workers. Due to the worker's postural position (usually kneeling) in 32 diameter pipes and working with fireproof clothing and masks with outdoor air supplying, due to fumes, sparks and molten metal particles, radiological contamination, confined space, poor lighting, ... Coating uniformity. As metallization is a manual process, the carried out measurements show small variations in the thickness of the coating, always within the tolerance limits established by the applicable regulations and quality assurance. An increase in the uniformity of the projected coating, increase the resistance and give a better surface protection. For all these reasons, Lainsa has developed the Tirant 3 robot, a worldwide innovative system, for metallization of steam pipes inner surface. Tirant 3 robot is tele operated from outside of the pipe, so that human intervention is reduced to the operations of robot positioning and change of metallization wire. As it is an independent system of the human factor, metallization process performance is significantly increased by reducing rest periods due only to the robot maintenance. Likewise, Tirant 3 system permits to increase resulting coating uniformity and thus its resistance, keeping selected parameters constant (forward speed, rotation speed and inner surface distance) depending on required type and thickness of wire. (Author)

  6. Development of an acoustic steam generator leak detection system using delay-and-sum beamformer

    International Nuclear Information System (INIS)

    Chikazawa, Yoshitaka

    2009-01-01

    A new acoustic steam generator leak detection system using delay-and-sum beamformer is proposed. The major advantage of the delay-and-sum beamformer is it could provide information of acoustic source direction. An acoustic source of a sodium-water reaction is supposed to be localized while the background noise of the steam generator operation is uniformly distributed in the steam generator tube region. Therefore the delay-and-sum beamformer could distinguish the acoustic source of the sodium-water reaction from steam generator background noise. In this paper, results from numerical analyses are provided to show fundamental feasibility of the new method. (author)

  7. Fail-safety of the EBR-II steam generator system

    International Nuclear Information System (INIS)

    Chopra, P.S.; Stone, C.C.; Hutter, E.; Barney, W.K.; Staker, R.G.

    1976-01-01

    Fail-safe analyses of the EBR-II steam-generator system show that a postulated non-instantaneous leak of water or steam into sodium, through a duplex tube or a tubesheet, at credible leak rates will not structurally damage the evaporators and superheaters. However, contamination of the system and possible shell wastage by sodium-water reaction products may render the system inoperable for a period exceeding six months. This period would be shortened to three months if the system were modified by adding a remotely operated water dump system, a steam vent system, a secondary sodium superheater relief line, and a tubesheet leak-detection system

  8. Development of methane conversion improvement method by recycling of residual methane for steam reforming as a part of R and D of HTGR-hydrogen production system

    International Nuclear Information System (INIS)

    Inagaki, Yoshiyuki; Haga, Katsuhiro; Aita, Hideki; Sekita, Kenji; Hino, Ryutaro; Koiso, Hiroshi.

    1998-01-01

    The purpose of the present study is to improve methane conversion for an HTGR-steam reforming system by recycling of residual methane. The residual methane in a product gas after steam reforming was recycled with a gas separator of polyimide membrane. Gas separation characteristics of the separator were investigated experimentally and numerically, and an experimental study on recycling system was carried out. The results showed that the recycling system improves apparent methane conversion, ratio of methane conversion to methane supply from a cylinder, from 20 to 32% compared with those without recycling. (author)

  9. Mitigation of steam generator tube rupture in a pressurized water reactor with passive safety systems

    Science.gov (United States)

    McDermott, Daniel J.; Schrader, Kenneth J.; Schulz, Terry L.

    1994-01-01

    The effects of steam generator tube ruptures in a pressurized water reactor are mitigated by reducing the pressure in the primary loop by diverting reactor coolant through the heat exchanger of a passive heat removal system immersed in the in containment refueling water storage tank in response to a high feed water level in the steam generator. Reactor coolant inventory is maintained by also in response to high steam generator level introducing coolant into the primary loop from core make-up tanks at the pressure in the reactor coolant system pressurizer. The high steam generator level is also used to isolate the start-up feed water system and the chemical and volume control system to prevent flooding into the steam header. 2 figures.

  10. Steam turbine installations

    International Nuclear Information System (INIS)

    Bainbridge, A.

    1976-01-01

    The object of the arrangement described is to enable raising steam for driving steam turbines in a way suited to operating with liquid metals, such as Na, as heat transfer medium. A preheated water feed, in heat transfer relationship with the liquid metals, is passed through evaporator and superheater stages, and the superheated steam is supplied to the highest pressure stage of the steam turbine arrangement. Steam extracted intermediate the evaporator and superheater stages is employed to provide reheat for the lower pressure stage of the steam turbine. Only a major portion of the preheated water feed may be evaporated and this portion separated and supplied to the superheater stage. The feature of 'steam to steam' reheat avoids a second liquid metal heat transfer and hence represents a simplification. It also reduces the hazard associated with possible steam-liquid metal contact. (U.K.)

  11. Steam 80 steam generator instrumentation

    International Nuclear Information System (INIS)

    Carson, W.H.; Harris, H.H.

    1980-01-01

    This paper describes two special instrumentation packages in an integral economizer (preheater) steam generator of one of the first System 80 plants scheduled to go into commercial operation. The purpose of the instrumentation is to obtain accurate operating information from regions of the secondary side of the steam generator inaccessible to normal plant instrumentation. In addition to verification of the System 80 steam generator design predictions, the data obtained will assist in verification of steam generator thermal/hydraulic computer codes developed for generic use in the industry

  12. ECONOMIC PRINCIPLES FOR SELECTION OF OPTIMUM POWER-SUPPLY SYSTEM DEVELOPMENT IN BELARUS

    Directory of Open Access Journals (Sweden)

    L. P. Padalko

    2008-01-01

    Full Text Available The paper considers main directions of the technological development of the Belarusian power-supply system. Comparative analysis of the economic efficiency of thermal power station modernization on the basis of steam- and gas technology, nuclear technology development and simple renovation of the worn-out generating capacities of thermal power stations has been carried out in the paper. Selection of the priority direction pertaining to optimization of industrial structure of the Belarusian power-supply system has been made on the basis of the presented minimum-specific cost criterion. The paper reveals that in the medium-term period the most optimum development of the Belarusian electrical power engineering is a technological  modernization  due to predicted  changes in natural gas and nuclear fuel costs. The modernization presupposes construction of topping plants in addition to the existing steam- and turbine equipment at thermal power stations. 

  13. Testing of modular industrial solar retrofit industrial process steam systems

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.

    1984-06-13

    Under the Department of Energy's Modular Industrial Solar Retrofit project, five industrial process heat systems incorporating line-focus solar collectors were designed and hardware was installed and tested at Sandia National Laboratories and the Solar Energy Research Institute. System designers and collector manufacturers participating in the project included Acurex Solar Corporation, BDM, Inc., Custom Engineering, Inc., Foster Wheeler Solar Development Corporation, Solar Kinetics, Inc., and Suntec Systems, Inc. This paper describes the testing of the qualification test systems which has been under way since mid-1982. Each qualification test system includes an equipment skid sufficient to support a collector field of 2300 m/sup 2/ aperture and one delta-tempeature string of from 175 to 460 m/sup 2/ aperture. Each system is capable of producing saturated steam at 1.7 MPa and operates at maximum outlet temperatures of from 250 to 290/sup 0/C. The test series includes function and safety tests to determine that the systems operate as specified, an unattended operation test of at least two weeks duration, performance tests to allow prediction of annual system performance, and life cycle tests to evaluate component lifetime and maintenance requirements. Since the start of testing, some twenty five modifications have been made to the various systems for the purpose of improving system performance and/or reliability, and appropriate tests of these modifictions have been made or are underway. This paper presents a description of the approach to testing of the MISR systems and selected test results.

  14. Condensate induced water hammer in a steam distribution system results in fatality

    International Nuclear Information System (INIS)

    Debban, H.L.; Eyre, L.E.

    1996-02-01

    Water hammer event s in steam distribution piping interrupt service and have the potential to cause serious injury and property damage. Conditions of condensation induced water hammer are discussed and recommendations aimed to improve safety of steam systems are presented. Condensate induced water hammer events at Hanford, a DOE facility, are examined

  15. ISABELLE magnet power supply system performance analysis

    International Nuclear Information System (INIS)

    Edwards, R.J.

    1981-01-01

    The power supply system that will energize the superconducting magnets in the ISABELLE 400 x 400 GeV accelerator must supply various voltages and currents. The voltages for the correction winding range from ten to one hundred twenty-five volts unipolar and bipolar with current rating of 50 to 300 amperes. The main field winding requires voltages from 90V (at flattop) to 600V during maximum ramp rate or acceleration cycle. The power supplies are programmable over their full range of output current with a reproducibility error varying from +- 10 ppM to +- 400 ppM of full scale. Included within the reproducibility error are the long and short term stability requirements of the power supplies. The purpose of this paper is to define some of the design goals and outline the approach taken in reaching these goals

  16. New eddy current testing system in steam generator tubes

    International Nuclear Information System (INIS)

    Nagata, Yasuyuki; Shimone, Junri; Maeda, Kotaro; Harada, Yutaka; Murakami, Ryuji

    2003-01-01

    Eddy Current Testing (ECT) technique is applied to PWR Steam Generator (SG) tubes during refueling outage inspection. Bobbin type probe is generally used for the inspection, but it cannot provide sufficient detectability for very tight cracks. NEL, R/D Tech (Canada) and AECL (Canada) jointly developed new ECT probe. The probe is transmit and receive type array probe. It has axial defect detection mode and circumferential defect detection mode. Its inspection speed is as fast as conventional bobbin probe, and detectability performance is same or better than performance of rotating pancake coil (RPC) probe, which is used for detailed inspection. As a tester of the new probe, we have developed new ECT tester TC7700. It is able to transmit composite wave from the 4 independent oscillators (simultaneous excitation system) compared with the conventional inspection system. As regarding for field inspection system, we have integrated Zetec (USA) probe positioner, probe pusher and R/D Tech TC7700. We are also developing new analysis software. The software has automated data screening function, which can deal with large amount of data compared with conventional bobbin probe. We plan to perform a large-scale field trial using the probe and new system in near future. (author)

  17. An integrated mine development and supply system

    Energy Technology Data Exchange (ETDEWEB)

    Muguira, T. [Brambles Coal Services, Newcastle, NSW (Australia)

    1998-12-31

    In the face of intense global competition and other business pressures on coal miners, ongoing quality initiatives and continuous process improvements are needed to enhance business performance. By viewing a minesite interms of key processes, rather than departments, and employing innovative technologies and better applying organisational resources, there exists enormous potential to achieve reductions in process cost and time. The paper identifies and selects one critical coal mining process, namely the supply system, to think about how productivity improvements might occur and what changes might be employed to enhance overall system performance. While the supply system is one of few processes existing at a minesite, the paper addresses only the supply process, but includes interaction across traditional interdepartmental boundaries. The paper has been prepared for a wide audience and is based on experience and observation at several underground mines however some of the concepts are a result of dreaming in the face of global competition. 3 refs., 1 tab.

  18. Ecotaxes and their impact in the cost of steam and electric energy generated by a steam turbine system

    International Nuclear Information System (INIS)

    Montero, Gisela

    2006-01-01

    Ecotaxes allow the internalization of costs that are considered externalities associated with polluting industrial process emissions to the atmosphere. In this paper, ecotaxes internalize polluting emissions negative impacts that are added to electricity and steam generated costs of a steam turbine and heat recovery systems from a utilities refinery plant. Steam costs were calculated by means of an exergy analysis tool and Aspen Plus simulation models. Ecotaxes were calculated for specific substances emitted in the refinery flue gases, based on a toxicity and pollution scale. Ecotaxes were generated from a model that includes damages produced to biotic and abiotic resources and considers the relative position of those substances in a toxicity and pollution scale. These ecotaxes were internalized by an exergoeconomic analysis resulting in an increase in the cost per kWh produced. This kind of ecotax is not applied in Mexico. The values of ecotaxes used in the cost determination are referred to the values currently applied by some European countries to nitrogen oxides emissions. (author)

  19. The SNR-300 steam generator small leak detection system

    International Nuclear Information System (INIS)

    Dumm, K.

    1984-01-01

    Small leak detection in the SNR-300 steam generator moduls is achieved by hydrogen meters. Development and design of the Nickel membrane - ion getter pump combination are described and sensitivity requests derived. Results of calibration tests by water/steam injections in a sodium loop are presented. The arrangement and interconnection of signals in SNR-300 are given and possibilities for inservice calibrations are discussed, supported by long time operation tests in the KNK-reactor plant. (author)

  20. Lifetime analysis of the THTR steam generator and piping system

    International Nuclear Information System (INIS)

    Kemter, F.; Gloeckner, H.J.; Fritz, H.U.; Koenig, H.

    1989-01-01

    For the life monitoring during operation of the water / steam circuit operated in the high temperature area and the steam-raising units in the THTR, the life monitoring program SLAP was developed. For highly loaded components the current components exploitation and the remaining available life can be determined during operation. A survey is given of the procedure in determining the life exploitation and of the program structure of SLAP. (DG) [de

  1. Steam generator

    International Nuclear Information System (INIS)

    Fenet, J.-C.

    1980-01-01

    Steam generator particularly intended for use in the coolant system of a pressurized water reactor for vaporizing a secondary liquid, generally water, by the primary cooling liquid of the reactor and comprising special arrangements for drying the steam before it leaves the generator [fr

  2. DAΦNE magnet power supply system

    International Nuclear Information System (INIS)

    Ricci, R.; Sanelli, C.; Stecchi, A.

    1998-01-01

    The e + -e - , 1020 MeV at center of mass, Particle Accelerator Complex DAΦNE, consists of a linear accelerator (Linac), a damping ring (D.A.), nearly 180 m of transfer lines (T.L.) and two storage rings (S.R.), that intersect each other in two points (I.P.), for Φ particle production. The D.A., T.L. and S.R. magnets are powered by means of 462 power supplies, rating from 100 W to 1 MW. The very different output currents, from 10 A to 2300 A, and output voltages, from 8 V to 1300 V, imposed many different technical solution realized by the world industry. This paper describes the Power Supply System giving also a description of the different typologies, their characteristics and control systems. The paper reports also the power supply performances and gives information on their installation and first year operation period

  3. Steam System Opportunity Assessment for the Pulp and Paper, Chemical Manufacturing, and Petroleum Refining Industries: Main Report

    Energy Technology Data Exchange (ETDEWEB)

    2002-10-01

    This report assesses steam generation and use in the pulp and paper, chemical, and petroleum refining industries, and estimates the potential for energy savings from implementation of steam system performance and efficiency improvements.

  4. Steam system opportunity assessment for the pulp and paper, chemical manufacturing, and petroleum refining industries: Main report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2002-10-01

    This report assesses steam generation and use in the pulp and paper, chemical, and petroleum refining industries, and estimates the potential for energy savings from implementation of steam system performance and efficiency improvements.

  5. Nutrient supply of plants in aquaponic systems

    OpenAIRE

    Bittsánszky, András; Uzinger, Nikolett; Gyulai, Gábor; Mathis, Alex; Junge, Ranka; Villarroel, Morris; Kotzen, Benzion; Komives, Tamas

    2016-01-01

    In this preliminary article we present data on plant nutrient concentrations in aquaponic systems, and compare them to nutrient concentrations in “standard” hydroponic solutions. Our data shows that the nutrient concentrations supplied by the fish in aquaponic system are significantly lower for most nutrients, compared to hydroponic systems. Nevertheless, plants do thrive in solutions that have lower nutrient levels than “standard” hydroponic solutions. This is especially true for green leafy...

  6. Dynamic response of the EBR-II secondary sodium system to postulated leaks of steam and water into sodium

    International Nuclear Information System (INIS)

    Srinivas, S.; Chopra, P.S.; Stone, C.C.

    1976-01-01

    The paper presents evaluations of the dynamic response of a steam generator system to postulated leaks of steam and water into sodium. This work is part of a comprehensive fail-safe analysis of the EBR-II steam generator system

  7. An assessment of underground and aboveground steam system failures in the SRS waste tank farms

    International Nuclear Information System (INIS)

    Hsu, T.C.; Shurrab, M.S.; Wiersma, B.J.

    1997-01-01

    Underground steam system failures in waste tank farms at the Savannah River Site (SRS) increased significantly in the 3--4 year period prior to 1995. The primary safety issues created by the failures were the formation of sub-surface voids in soil and the loss of steam jet transfer and waste evaporation capability, and the loss of heating and ventilation to the tanks. The average annual cost for excavation and repair of the underground steam system was estimated to be several million dollars. These factors prompted engineering personnel to re-consider long-term solutions to the problem. The primary cause of these failures was the inadequate thermal insulation utilized for steam lines associated with older tanks. The failure mechanisms were either pitting or localized general corrosion on the exterior of the pipe beneath the thermal insulation. The most realistic and practical solution is to replace the underground lines by installing aboveground steam systems, although this option will incur significant initial capital costs. Steam system components, installed aboveground in other areas of the tank farms have experienced few failures, while in continuous use. As a result, piecewise installation of temporary aboveground steam systems have been implemented in F-area whenever opportunities, i.e., failures, present themselves

  8. INFORMATION SYSTEM OF ENTERPRISE SUPPLY CHAIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    I. V. Shatokhin

    2016-01-01

    Full Text Available The supply chain management method for manufacture scheduling and planning basedon APS-algorithm is offered. It . Logistics solutions and inventory management problems are discussed. The structure of automated control system of enterprise is designed and its tasks are described.

  9. Extension planning for electrical energy supply systems

    International Nuclear Information System (INIS)

    Bieselt, R.

    1975-01-01

    In the future as well as in the past, and in particular in the next decade a considerable increase in electrical energy demand can be expected. To satisfy this demand in a reliable and sufficient manner will force the utilities to invest large sums of money for the operation and the extension of power generation and distribution plants. The size of these investments justifies the search for more and more comprehensive and at the same time more detailed planning methods. With the help of system analysis a planning model for the electricity supply industry of a major supply area will be designed. (orig./RW) [de

  10. Some engineering aspects of the steam generator system for the United States LMFBR demonstration plant

    International Nuclear Information System (INIS)

    Tippets, F.E.

    1975-01-01

    This paper describes the main design features of the steam generator system for the Clinch River Breeder Reactor Plant and the engineering approach being employed for some of the critical elements of this system, including in particular the sodium-steam/water boundary, the efforts to have this boundary be of highest integrity, and the system features to safely accommodate any failure of the boundary. (author)

  11. Some engineering aspects of the steam generator system for the United States LMFBR demonstration plant

    Energy Technology Data Exchange (ETDEWEB)

    Tippets, F E

    1975-07-01

    This paper describes the main design features of the steam generator system for the Clinch River Breeder Reactor Plant and the engineering approach being employed for some of the critical elements of this system, including in particular the sodium-steam/water boundary, the efforts to have this boundary be of highest integrity, and the system features to safely accommodate any failure of the boundary. (author)

  12. Energy consumption in the food supply system

    DEFF Research Database (Denmark)

    Kamp, Andreas; Østergård, Hanne; Hauggaard-Nielsen, Henrik

    2016-01-01

    Historically, productivity gains have been possible by the application of energy intensive technologies. In the future, new technologies and practices based on energy from renewable resources are central for the development of our food supply system and they will contribute in two different ways....... As the energy sector increasingly bases energy supply on renewable sources, the energy requirements of the food sector will automatically substitute renewable energy for non-renewable energy in all stages of food supply. In principle, the food sector does not need to change if renewable energy is sufficient...... and available as the energy carriers that we are used to today. We may think of this as passive adaptation. A passive adaptation strategy may support a development towards the image ‘high input – high output’. The food sector, however, may also actively adapt to a future without fossil fuels and change...

  13. The role of enterprise systems in supply chain networks: a taxonomy of supply chain strategies

    DEFF Research Database (Denmark)

    Møller, Charles

    2006-01-01

    in the supply chain and to choose the right supply chain strategy. The work is based on a comprehensive study of the Supply Chain Management (SCM) and Enterprise Resource Planning (ERP) literature and the study suggests that there is an emerging new research potential for Enterprise Systems (ES) in the supply......This paper proposes a taxonomy for supply chain integration strategies. The taxonomy is based on the contingencies of supply chain network coupling and the Extended Enterprise Systems (EES) architecture in the supply chain. The purpose of this model is to map the portfolio of relations...

  14. A steam inerting system for hydrogen disposal for the Vandenberg Shuttle

    Science.gov (United States)

    Belknap, Stuart B.

    1988-01-01

    A two-year feasibility and test program to solve the problem of unburned confined hydrogen at the Vandenberg Space Launch Complex Six (SLC-6) during Space Shuttle Main Engine (SSME) firings is discussed. A novel steam inerting design was selected for development. Available sound suppression water is superheated to flash to steam at the duct entrance. Testing, analysis, and design during 1987 showed that the steam inerting system (SIS) solves the problem and meets other flight-critical system requirements. The SIS design is complete and available for installation at SLC-6 to support shuttle or derivative vehicles.

  15. Effects of the steam chest on steamhammer analysis for nuclear piping systems

    International Nuclear Information System (INIS)

    Luk, C.

    1975-01-01

    When applying the method of characteristics for the steamhammer analysis of a nuclear piping system, if the dynamic fluid behavior in the steam chest is not considered, the boundary condition thus formulated to describe the time-dependent fluid behavior of the steam chest would lead to numerical unstable solution. To overcome this difficulty, the dynamic fluid behavior in the steam chest can be described by a single degree mechanical system. The corresponding flow conditions there are then determined by the time-step amplification method. This dynamic boundary condition reduces the calculated steamhammer loads and helps avoid numerical instability problems in the computing procedure. 4 refs

  16. Technical evaluation report on the monitoring of electric power to the reactor-protection system for the Brunswick Steam Electric Plant, Units 1 and 2

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the monitoring of electric power to the reactor protection system (RPS) at the Brunswick Steam Electric Plant, Units 1 and 2. The evaluation is to determine if the proposed design modification will protect the RPS from abnormal voltage and frequency conditions which could be supplied from the power supplies and will meet certain requirements set forth by the Nuclear Regulatory Commission. The proposed design modifications with time delays verified by GE, will protect the RPS from sustained abnormal voltage and frequency conditions from the supplying sources

  17. Estimates of the costs of steam derived from nuclear and fossil fuels

    International Nuclear Information System (INIS)

    Spiewak, I.; Klepper, O.H.

    1978-01-01

    Process steam from intermediate size and large reactors is cheaper than steam produced in conventional boilers burning coal, or oil at $2.21/GJ($14/barrel in 1976 dollars). Small nuclear and coal-based steam supply systems may be competitive with oil under criteria that consider long-term economic inflation and the detailed financial and tax structure of the energy user

  18. A pilot-scale steam autoclave system for treating municipal solid waste for recovery of renewable organic content: Operational results and energy usage.

    Science.gov (United States)

    Holtman, Kevin M; Bozzi, David V; Franqui-Villanueva, Diana; Offeman, Richard D; Orts, William J

    2016-05-01

    A pilot-scale (1800 kg per batch capacity) autoclave used in this study reduces municipal solid waste to a debris contaminated pulp product that is efficiently separated into its renewable organic content and non-renewable organic content fractions using a rotary trommel screen. The renewable organic content can be recovered at nearly 90% efficiency and the trommel rejects are also much easier to sort for recovery. This study provides the evaluation of autoclave operation, including mass and energy balances for the purpose of integration into organic diversion systems. Several methods of cooking municipal solid waste were explored from indirect oil heating only, a combination of oil and direct steam during the same cooking cycle, and steam only. Gross energy requirements averaged 1290 kJ kg(-1) material in vessel, including the weight of free water and steam added during heating. On average, steam recovery can recoup 43% of the water added and 30% of the energy, supplying on average 40% of steam requirements for the next cook. Steam recycle from one vessel to the next can reduce gross energy requirements to an average of 790 kJ kg(-1). © The Author(s) 2016.

  19. Dynamic Simulation of the Water-steam System in Once-through Boilers - Sub-critical Power Boiler Case -

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seongil; Choi, Sangmin [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2017-05-15

    The dynamics of a water-steam system in a once-through boiler was simulated based on the physics-based modeling approach, representing the system in response to large load change or scale disturbance simulations. The modeling considered the mass, energy conservation, and momentum equation in the water pipe and the focus was limited to the sub-critical pressure region. An evaporator tube modeling was validated against the reference data. A simplified boiler system consisting of economizer, evaporator, and superheater was constructed to match a 500 MW power boiler. The dynamic response of the system following a disturbance was discussed along with the quantitative response characteristics. The dynamic response of the boiler system was further evaluated by checking the case of an off-design point operation of the feedwater-to-fuel supply ratio. The results re-emphasized the significance of controlling the feedwater-to-fuel supply ratio and additional design requirements of the water-steam separator and spray attemperator.

  20. Dynamic Simulation of the Water-steam System in Once-through Boilers - Sub-critical Power Boiler Case -

    International Nuclear Information System (INIS)

    Kim, Seongil; Choi, Sangmin

    2017-01-01

    The dynamics of a water-steam system in a once-through boiler was simulated based on the physics-based modeling approach, representing the system in response to large load change or scale disturbance simulations. The modeling considered the mass, energy conservation, and momentum equation in the water pipe and the focus was limited to the sub-critical pressure region. An evaporator tube modeling was validated against the reference data. A simplified boiler system consisting of economizer, evaporator, and superheater was constructed to match a 500 MW power boiler. The dynamic response of the system following a disturbance was discussed along with the quantitative response characteristics. The dynamic response of the boiler system was further evaluated by checking the case of an off-design point operation of the feedwater-to-fuel supply ratio. The results re-emphasized the significance of controlling the feedwater-to-fuel supply ratio and additional design requirements of the water-steam separator and spray attemperator.

  1. Systemic-Functional Approach to Utilities Supplys

    Directory of Open Access Journals (Sweden)

    Nikolay I. Komkov

    2017-01-01

    Full Text Available Purpose: the purpose of the article consists in statement of management approach to development of utilities supply processes based on conflict situations decision – making search. It had appeared in the period of the transition from the planned and directive management to market development. Methods: the research methodology is based on the system analysis of full life cycle processes functioning, forecasting of complex systems development, mathematical modeling of processes of services supply and innovative and investment projects modeling as well as development of supplying services processes. Results: the results of the work are concentrated in the presentation of systemic-functional approach to managing the development of processes of municipal services, able to resolve conflict situations in this sphere. Conclusions and Relevance: the traditional management approach on the basis of elimination of "bottlenecks" and emergencies prevailing within planned and directive system at its transformation in the market conditions has led to accumulation of conflict situations and unsolvable problems. The offered systemic-functional approach based on forecasting of full life cycle of the modernized processes and the services providing systems allows to consider costs of modernization, prime cost and quality of the rendered services. 

  2. IN SITU STEAM ENHANCED RECOVERY PROCESS - HUGHES ENVIRONMENTAL SYSTEMS, INC. - INNOVATIVE TECHNOLOGY EVALUATION REPORT

    Science.gov (United States)

    This Innovative Technology Evaluation report summarizes the findings of an evaluation of the in situ Steam Enhanced Recovery Process (SERP) operated by Hughes Environmental Systems, Inc. at the Rainbow Disposal facility in Huntington Beach, California. he technology demonstration...

  3. Economic feasibility of an energy efficiency project for a steam distribution system in a chemical industry

    Directory of Open Access Journals (Sweden)

    Flavia Melo Menezes

    2017-12-01

    Full Text Available The burning of fossil fuels majorly contributes to the increase in global warming, and it represents 93% of greenhouse gases emissions in the chemical industry. Most of the energy demand in this sector is associated with steam systems, where 1/3 of the energy efficiency opportunities are located in its distribution system. However, most of the literature focuses on the design of new systems. Those that deal with existing systems, not always use simple and available methods. Furthermore, they address energy losses of steam systems only due to thermal insulation, ignoring those due to leakages of traps. Given this context, the purpose of this paper is to determine the economic feasibility of an energy efficiency project for a steam distribution system in a chemical industry, located in the metropolitan region of Salvador, Brazil. First, the energy lost in the steam distribution system through heat insulation and steam traps was estimated by applying thermodynamic principles, and technic consulting, respectively. Then, investments were estimated using commercial prices for new thermal insulation and steam traps. Finally, an economic evaluation of the improvement project was made, through the construction of a cash flow, and calculation of economic indicators: payback time, net present value (NPV, and internal rate of return (IRR. Economic indicators showed that the project is economically viable. The NPV and IRR reached approximately 5 million reais, and 66% per year, respectively. Additionally, this project also had social and environmental benefits, such as a reduction in greenhouse gases emissions, and increased local water availability.

  4. Integration of steam injection and inlet air cooling for a gas turbine generation system

    International Nuclear Information System (INIS)

    Wang, F.J.; Chiou, J.S.

    2004-01-01

    The temperature of exhaust gases from simple cycle gas turbine generation sets (GENSETs) is usually very high (around 500 deg. C), and a heat recovery steam generator (HRSG) is often used to recover the energy from the exhaust gases and generate steam. The generated steams can be either used for many useful processes (heating, drying, separation etc.) or used back in the power generation system for enhancing power generation capacity and efficiency. Two well-proven techniques, namely steam injection gas turbine (STIG) and inlet air cooling (IAC) are very effective features that can use the generated steam to improve the power generation capacity and efficiency. Since the energy level of the generated steam needed for steam injection is different from that needed by an absorption chiller to cool the inlet air, a proper arrangement is required to implement both the STIG and the IAC features into the simple cycle GENSET. In this study, a computer code was developed to simulate a Tai power's Frame 7B simple cycle GENSET. Under the condition of local summer weather, the benefits obtained from the system implementing both STIG and IAC features are more than a 70% boost in power and 20.4% improvement in heat rate

  5. Steam temperature control of essential oil extraction system using ...

    African Journals Online (AJOL)

    This research proposed a closed-loop temperature control using a self-tuning fuzzy fractional-order PI (FOPI) controller to overcome the problem. The controller will regulate the steam temperature at a desired level to protect the oil from excessive heat. Self capability of fuzzy rules was found to facilitate the tuning using only ...

  6. Unique systems for inspection and repair of VVER steam generators

    International Nuclear Information System (INIS)

    Kovalyk, Adrian; Pilat, Peter; Jablonicky, Pavol

    2014-01-01

    During over 30 years, VUJE Trnava has developed a series of remote control manipulators for in-service inspection and maintenance of steam generator collectors. The manipulators have been widely used on WWER type reactors in Slovakia and abroad. Some of the manipulators for non-destructive testing are shown.

  7. Steam Digest 2002

    Energy Technology Data Exchange (ETDEWEB)

    2003-11-01

    Steam Digest 2002 is a collection of articles published in the last year on steam system efficiency. DOE directly or indirectly facilitated the publication of the articles through it's BestPractices Steam effort. Steam Digest 2002 provides a variety of operational, design, marketing, and program and program assessment observations. Plant managers, engineers, and other plant operations personnel can refer to the information to improve industrial steam system management, efficiency, and performance.

  8. Pulsed high-pressure (PHP) drain-down of steam generating system

    International Nuclear Information System (INIS)

    Petrusek, R.A.

    1991-01-01

    This patent describes an improved method of draining down contained reactor-coolant water from the inverted vertical U-tubes of at least one vertical-type steam generator in which the upper inverted U-shaped ends of the tubes are closed and the lower ends thereof are open, the steam generator having a channel head at its lower end including a vertical dividing wall defining a primary water inlet side and a primary water outlet side of the generator, the steam generator having chemical volume control system means and residual heat removal system means, and the steam generator being part of a nuclear-powered steam generating system wherein the reactor-coolant water is normally circulated from and back into the reactor via a loop comprising the steam generator and inlet and outlet conduits connected to the lower end of the steam generator, and the reactor being in communication with pressurizer means and comprising the steps of introducing a gas which is inert to the system and which is under pressure above atmospheric pressure into at least one of the downwardly facing open ends of each of the U-tubes from below the tubesheet in which the open ends of the U-tubes are mounted adjacent the lower end of the steam generator while permitting the water to flow out from the open ends of the U-tubes, the improvement in combination therewith for substantially increasing the effectiveness and efficiency of such water removal from the tubes. It includes determining the parameters effecting a first average volumetric rate of removal for a predetermined period of time, infra, of the reactor-coolant water from the inverted vertical U-tubes, the specific unit for the first average volumetric rate expressing properties identical with the properties expressed in a second average volumetric rate maintained in a later mentioned step

  9. Supply Chain Systems Architecture and Engineering Design: Green-field Supply Chain Integration

    OpenAIRE

    Radanliev, P

    2015-01-01

    This paper developed a new theory for supply chain architecture, and engineering design that enables integration of the business and supply chain strategies. The architecture starts with individual supply chain participants and derives insights into the complex and abstract concept of green-field integration design. The paper presented a conceptual system for depicting the interactions between business and supply chain strategy engineering. The system examines the decisions made when engineer...

  10. Innovation of blow-down system in steam generators of a VVER 440 unit

    International Nuclear Information System (INIS)

    Matal, O.; Simo, T.; Mancev, M.D.

    1997-01-01

    The impurities getting into the steam generator with the feedwater are continually removed by the blowdown and unit sludge system. The mostly non-symmetrical type of pipe branches under steam generators at WWER-440 units causes nonuniform blowdown flow rates at the halves of the steam generator; this often leads to a blocking of the pipe with the lower flow rate. The most simple way of hydraulically equalizing the blowdown pipes is to implement symmetric blowdown pipes and to install efficient throttling elements in the pipe. The proposed innovation will make it possible to re-distribute the blowdown flow rates and to reduce more effectively the concentrations of impurities in steam generators. (M.D.)

  11. Small leak damage and protection systems in steam generators

    International Nuclear Information System (INIS)

    Greene, D.A.

    1976-01-01

    A small leak of water into sodium in a liquid metal heated steam generator can cause damage to adjacent tubes, a phenomenon termed wastage. Theories on this phenomenon range from corrosion from sodium water reaction products to erosion by supersonic particles. An alternative approach considers the water injection to form a simple combustion process. Using this approach many aspects of over 250 wastage experiments can be explained both analytically and physically. The U.S. has an extensive technology in the general area of acoustic surveillance. High temperature in-sodium microphones, in-vessel waveguides, and data analysis techniques have been successfully demonstrated in national development programs. This technology has been applied specifically to the development of an acoustic leak detection/location monitor for small leaks in an operating steam generator

  12. The development of a control system for a small high speed steam microturbine generator system

    Science.gov (United States)

    Alford, A.; Nichol, P.; Saunders, M.; Frisby, B.

    2015-08-01

    Steam is a widely used energy source. In many situations steam is generated at high pressures and then reduced in pressure through control valves before reaching point of use. An opportunity was identified to convert some of the energy at the point of pressure reduction into electricity. To take advantage of a market identified for small scale systems, a microturbine generator was designed based on a small high speed turbo machine. This machine was packaged with the necessary control valves and systems to allow connection of the machine to the grid. Traditional machines vary the speed of the generator to match the grid frequency. This was not possible due to the high speed of this machine. The characteristics of the rotating unit had to be understood to allow a control that allowed export of energy at the right frequency to the grid under the widest possible range of steam conditions. A further goal of the control system was to maximise the efficiency of generation under all conditions. A further complication was to provide adequate protection for the rotating unit in the event of the loss of connection to the grid. The system to meet these challenges is outlined with the solutions employed and tested for this application.

  13. Ultracapacitor-Based Uninterrupted Power Supply System

    Science.gov (United States)

    Eichenberg, Dennis J.

    2011-01-01

    The ultracapacitor-based uninterrupted power supply (UPS) system enhances system reliability; reduces life-of-system, maintenance, and downtime costs; and greatly reduces environmental impact when compared to conventional UPS energy storage systems. This design provides power when required and absorbs power when required to smooth the system load and also has excellent low-temperature performance. The UPS used during hardware tests at Glenn is an efficient, compact, maintenance-free, rack-mount, pure sine-wave inverter unit. The UPS provides a continuous output power up to 1,700 W with a surge rating of 1,870 W for up to one minute at a nominal output voltage of 115 VAC. The ultracapacitor energy storage system tested in conjunction with the UPS is rated at 5.8 F. This is a bank of ten symmetric ultracapacitor modules. Each module is actively balanced using a linear voltage balancing technique in which the cell-to-cell leakage is dependent upon the imbalance of the individual cells. The ultracapacitors are charged by a DC power supply, which can provide up to 300 VDC at 4 A. A constant-voltage, constant-current power supply was selected for this application. The long life of ultracapacitors greatly enhances system reliability, which is significant in critical applications such as medical power systems and space power systems. The energy storage system can usually last longer than the application, given its 20-year life span. This means that the ultracapacitors will probably never need to be replaced and disposed of, whereas batteries require frequent replacement and disposal. The charge-discharge efficiency of rechargeable batteries is approximately 50 percent, and after some hundreds of charges and discharges, they must be replaced. The charge-discharge efficiency of ultracapacitors exceeds 90 percent, and can accept more than a million charges and discharges. Thus, there is a significant energy savings through the efficiency improvement, and there is far less

  14. A system for regulating the pressure of resuperheated steam in high temperature gas-cooled reactor power stations

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegines, K.O.

    1975-01-01

    The invention relates to a system for regulating steam-pressure in the re-superheating portion of a steam-boiler receiving heat from a gas-cooled high temperature nuclear reactor, provided with gas distributing pumps driven by steam-turbines. The system comprises means for generating a pressure signal of desired magnitude for the re-superheating portion, and means for providing a real pressure in the re-superheating portion, means (including a by-passing device) for generating steam-flow rate signal of desired magnitude, a turbine by-pass device comprising a by-pass tapping means for regulating the steam-flow-rate in said turbine according to the desired steam-flow rate signal and means for controlling said by-pass tapping means according to said desired steam-flow-rate signal [fr

  15. Steam Methane Reformation Testing for Air-Independent Solid Oxide Fuel Cell Systems

    Science.gov (United States)

    Mwara, Kamwana N.

    2015-01-01

    Recently, NASA has been looking into utilizing landers that can be propelled by LOX-CH (sub 4), to be used for long duration missions. Using landers that utilize such propellants, also provides the opportunity to use solid oxide fuel cells as a power option, especially since they are able to process methane into a reactant through fuel reformation. One type of reformation, called steam methane reformation, is a process to reform methane into a hydrogen-rich product by reacting methane and steam (fuel cell exhaust) over a catalyst. A steam methane reformation system could potentially use the fuel cell's own exhaust to create a reactant stream that is hydrogen-rich, and requires less internal reforming of the incoming methane. Also, steam reformation may hold some advantages over other types of reforming, such as partial oxidation (PROX) reformation. Steam reformation does not require oxygen, while up to 25 percent can be lost in PROX reformation due to unusable CO (sub 2) reformation. NASA's Johnson Space Center has conducted various phases of steam methane reformation testing, as a viable solution for in-space reformation. This has included using two different types of catalysts, developing a custom reformer, and optimizing the test system to find the optimal performance parameters and operating conditions.

  16. Nutrient supply of plants in aquaponic systems

    Directory of Open Access Journals (Sweden)

    Andras Bittsanszky

    2016-10-01

    Full Text Available In this preliminary article we present data on plant nutrient concentrations in aquaponics systems, and we compare them to nutrient concentrations in “standard” hydroponic solutions. Our data shows that the nutrient concentrations supplied by the fish in the aquaponics system are significantly lower for most nutrients compared to hydroponic systems. Nevertheless, plants do thrive in solutions that have lower nutrient levels compared to “standard” hydroponic solutions. This is especially true for green leafy vegetables that rarely need additional nutritional supplementation. It is concluded that in the highly complex system of aquaponics, special care has to be taken, via continuous monitoring of the chemical composition of the circulating water, to provide adequate concentrations and ratios of nutrients, and especially for the potentially toxic component, ammonium. If certain plants require nutrient supplementation, we consider that one based on organic substances would be most beneficial. However, protocols for the application of such nutrient amendments still need to be developed.

  17. Main Steam Line Break Analysis for the Fully Passive Safety System of SMART

    International Nuclear Information System (INIS)

    Kim, Seong Wook; Chun, Ji Han; Bae, Kyoo Hwan; Kim, Keung Koo

    2013-01-01

    The standard design approval of SMART (System-integrated Modular Advanced ReacTor) developed by KAERI and KEPCO consortium was issued on July 4, 2012. Although SMART has enhanced safety compared to the conventional reactor, there is a demand to meet the 'passive safety performance requirements' after the Fukushima accident. The passive safety performance requirements are the capabilities to maintain the plant at a safe shutdown condition for a minimum of 72 hours without AC power supply or operator action in case of design basis accident (DBA). To satisfy the requirements, KAERI is developing a safety enhanced SMART by adopting a passive safety injection system. The passive safety injection system developed for SMART is a gravity-driven injection system, which consists of four trains, each of which includes a pressure balance line, core makeup tank (CMT), safety injection tank (SIT) and injection line. The CMT plays an important role to inject borated water into the RCS to prevent or dissolve the return to power (re-criticality) condition during the event of increase in heat removal by the secondary system. The main steam line break accident (MSLB) is the most limiting accident for an increase in heat removal by the secondary system. In this study, the safety analysis results of MSLBs at hot full power condition and at hot zero power condition in view of re-criticality are given. The MSLB accident has been analyzed for the SMART adopting fully passive safety system in the aspect of re-criticality. The results show that the core remains subcritical condition throughout the transient due to the borated water injected by the CMT. As further works, many kinds of analyses and sensitivity studies should be performed for the design establishment and improvement of the fully passive system of SMART

  18. Abort kicker power supply systems at Fermilab

    International Nuclear Information System (INIS)

    Krafczyk, G.; Dugan, G.; Harrison, M.; Koepke, K.; Tilles, E.

    1985-01-01

    Over the past several years, Fermilab has been operating with a single turn proton abort system in both the superconducting Tevatron and the conventional Main Ring. The abort kicker power supply for this system discharges a lumped capacitance into the inductive magnet load, causing the beam to enter the abort channel. A unique feature of this design is the high voltage, high current diode assembly used to clip the recharge of the capacitor bank. This allows the current to decay slowly with the L/R time constant of the magnet and diode series combination. Special attention will be given to the diode characteristics needed for this passive switching element. Operational experience and proposed upgrades will be given for the two operational systems

  19. Experience in adjusting of the level regulation system of steam generators of the Rovno NPP

    International Nuclear Information System (INIS)

    Patselyuk, S.N.; Sokolov, A.G.; Kazakov, V.I.; Dorosh, Yu.A.

    1984-01-01

    A system of feed water level control in steam generators at the Rovno NPP with WWER-440 reactors which comprises start-up as well as main regulators is described. The start-up regulator (single-pulsed with a signal by the level) keeps the level in the steam generator at loadings up to 30% of the nominal reactor power Nsub(nom.) The main regulator is connected in the three-pulsed circuit and it receives signals by steam and water flow rate and by the level in the steam generator. The main regulator has been started only at loadings above 40% Nsub(nom.). After reconstruction it was used in the 15-100% Nsub(nom.) range. Characteristics of the level control system in the steam generator at perturbations intoduced by the main circulating pump (MCP) and turbine disconnection as well as change in feed water flow rate have been studied. The studies have revealed that the system ensures necessary quality of control in stationary modes. The system operates stably at perturbations of feed water flow rate up to 50% Nsub(nom.). Perturbations by MCP connections and disconnections is most difficult for control system

  20. Does a new steam meal catering system meet patient requirements in hospital?

    Science.gov (United States)

    Hickson, M; Fearnley, L; Thomas, J; Evans, S

    2007-10-01

    It has been consistently observed that a significant proportion of hospital inpatients are malnourished and many actually develop malnutrition in hospital. The NHS provides over 300 million meals each year at a cost of pound 500 million, yet there is relatively little research evaluating how well different catering systems provide for the needs of hospital inpatients. The aim of the study was to: (i) evaluate whether a new steam meal catering system (Steamplicity) enables patients in theory to meet their energy requirements in hospital and (ii) compare energy and protein intake using Steamplicity with a traditional bulk cook-chill system. Patients not at nutritional risk had their food intake at one lunchtime assessed. Energy intake was compared with the patients' energy requirements and energy and protein intake were compared with previous data from a bulk system. Fifty-seven patients had a median daily energy requirement of 7648 kJ (1821 kcal) [inter-quartile range (IQR): 6854-9164 kJ]. Assuming 30% [2293 kJ (546 kcal)] should be supplied by the lunch meal the average intake of 1369 kJ (326 kcal) fell short by 40%. Patients served meals from Steamplicity ate less energy [1369 kJ versus 1562 kJ (326 kcal versus 372 kcal) P = 0.04] but similar protein (18 g versus 19 g P = 0.34) to the bulk system. The largest difference was the energy provided by the dessert since the bulk system served more hot high-calorie desserts. Patient intakes did not meet their estimated requirements. The patients in this study were eating well and not at nutritional risk, thus patients with a poor appetite will be even less likely to meet their nutritional requirements. Steamplicity meals result in a lower energy intake than meals from a bulk cook-chill system, but similar protein intakes.

  1. Proposal for a district heat supply system

    International Nuclear Information System (INIS)

    Alefeld, G.

    1976-01-01

    A district heating scheme is proposed which makes it possible to use the waste heat from power stations for the supply of households and industry. The heat is stored by evaporation of ammonia salts or liquids with dissolved salts. Both substances are transported on existing rail- or waterways to heating stations near the consumers, and the heat recovered by reaction of the two components. Then the product of reaction is transported back to the power stations, and reactivated by heat again. Based on a cost estimation, it can be shown that the proposed heat transport with heat trains or ships, at distances up to 100 km, results in heat costs which are to-day already below that of heat from fuel oil. The investment required for the heat transport system is unusually low due to the use of transport ways which already exist. The district heating system is not only favourable in respect of the environment, but actually reduces its present strain, both at the consumer and at the power stations. The technical advantages of the suggested concept, especially the possibility of introducing it in stages, are discussed. The consequences for the national economy regarding the safety of supply and the trade balance, as well as for the public transport undertakings, are obvious, and therefore not included in the paper. (orig.) [de

  2. Maximising water supply system yield subject to multiple reliability ...

    African Journals Online (AJOL)

    Maximising water supply system yield subject to multiple reliability constraints via simulation-optimisation. ... Water supply systems have to satisfy different demands that each require various levels of reliability ... and monthly operating rules that maximise the yield of a water supply system subject to ... HOW TO USE AJOL.

  3. Steam System Balancing and Tuning for Multifamily Residential Buildings in Chicagoland - Second Year of Data Collection

    Energy Technology Data Exchange (ETDEWEB)

    Choi, J.; Ludwig, P.; Brand, L.

    2013-08-01

    Steam heated buildings often suffer from uneven heating as a result of poor control of the amount of steam entering each radiator. In order to satisfy the heating load to the coldest units, other units are overheated. As a result, some tenants complain of being too hot and open their windows in the middle of winter, while others complain of being too cold and are compelled to use supplemental heat sources. Building on previous research, CNT Energy identified 10 test buildings in Chicago and conducted a study to identify best practices for the methodology, typical costs, and energy savings associated with steam system balancing. A package of common steam balancing measures was assembled and data were collected on the buildings before and after these retrofits were installed to investigate the process, challenges, and the cost effectiveness of improving steam systems through improved venting and control systems. The test buildings that received venting upgrades and new control systems showed 10.2% savings on their natural gas heating load, with a simple payback of 5.1 years. The methodologies for and findings from this study are presented in detail in this report. This report has been updated from a version published in August 2012 to include natural gas usage information from the 2012 heating season and updated natural gas savings calculations.

  4. Operational control and maintenance integrity of typical and atypical coil tube steam generating systems

    Energy Technology Data Exchange (ETDEWEB)

    Beardwood, E.S.

    1999-07-01

    Coil tube steam generators are low water volume to boiler horsepower (bhp) rating, rapid steaming units which occupy substantially less space per boiler horsepower than equivalent conventional tire tube and water tube boilers. These units can be retrofitted into existing steam systems with relative ease and are more efficient than the generators they replace. During the early 1970's they became a popular choice for steam generation in commercial, institutional and light to medium industrial applications. Although these boiler designs do not require skilled or certified operators, an appreciation for a number of the operational conditions that result in lower unscheduled maintenance, increased reliability and availability cycles would be beneficial to facility owners, managers, and operators. Conditions which afford lower operating and maintenance costs will be discussed from a practical point of view. An overview of boiler design and operation is also included. Pitfalls are provided for operational and idle conditions. Water treatment application, as well as steam system operations not conducive to maintaining long term system integrity; with resolutions, will be addressed.

  5. System for steam-reactivity measurements on fusion-relevant materials

    International Nuclear Information System (INIS)

    Anderl, R.A.; Pawelko, R.J.; Oates, M.A.; Smolik, G.R.; McCarthy, K.A.

    1996-01-01

    This paper describes an experimental system developed to investigate steam-metal reactions important to fusion technology. The system is configured specifically to measure hydrogen generation rates and tritium mobilization rates for irradiated beryllium specimens that are heated and exposed to steam. Results are presented for extensive performance and scoping tests of the system to validate the experimental technique, to determine hydrogen-generation rate detection sensitivity, and to establish appropriate calibration methods. These results include measurements of the hydrogen generation rates for steam interactions with austenitic steel, tungsten and beryllium metal specimens. The results of these scoping tests compare favorably with previous work, and they indicate a significant improvement in hydrogen detection sensitivity over previous approaches. 6 refs., 9 figs., 1 tab

  6. 400-MWe consolidated nuclear steam system (CNSS): 1200-MWt/conceptual design

    International Nuclear Information System (INIS)

    1977-06-01

    A 1200-MWt consolidated nuclear steam system (CNSS) conceptual design is described. The concept, derived from nuclear merchant ship propulsion steam systems but distinctly different from those systems in detail, incorporates the steam generators within the reactor pressure vessel. This configuration eliminates primary coolant circulating piping external to the reactor pressure vessel since the primary coolant circulating pumps are mounted in the pressure vessel head. So arranged, the maximum piping break that must be assumed is that of the pressurizer surge line, which is substantially smaller than a primary coolant circulating line. A fracture of the pressurizer surge line would result in substantially lower mass and energy release rates of the primary coolant during the assumed loss-of-coolant accident. This in turn makes practical a pressure-suppression containment rather than the ''dry'' containment commonly used for pressurized water reactors

  7. Design of a steam reforming system to be connected to the HTTR

    International Nuclear Information System (INIS)

    Hada, K.; Nishihara, T.; Shibata, T.; Shiozawa, S.

    1996-01-01

    Top priority objective for developing the first heat utilization system to be connected to the HTTR is to demonstrate technical feasibility of a nuclear process heat utilization system for production of hydrogen for the first time in the world. Major issues to be resolved for coupling the heat utilization system to the HTTR are 1)to develop safety philosophy for reasonably and reliably ensuring safety of the nuclear reactor, 2)to develop control design concept for the total system of the nuclear reactor and heat utilization system because thermal dynamics of endothermic chemical reactor to be heated by nuclear heat is much different from the nuclear reactor, 3)to develop helium-heated components and 4)to develop enhanced hydrogen production technologies for achieving competitiveness to a fossil-fired plant. A steam reforming hydrogen production system was studied as one of the first priority candidates for an HTTR-heat utilization system due to matured technology in fossil-fired plants and since technical solutions demonstrated by the coupling of the steam reforming system to the HTTR will contribute to all other hydrogen production systems. Basic design philosophy for the HTTR-steam reforming system is that the steam reforming plant downstream of an intermediate secondary helium loop is designed at the same safety level as fossil-fired plants and therefore the secondary helium loop was selected as a safety barrier to the HTTR nuclear reactor. (J.P.N.)

  8. Hot weather stresses system : more supply needed

    International Nuclear Information System (INIS)

    Anon

    2002-01-01

    Signs of stress in Ontario's electric system were revealed this summer, mainly as a result of the hot and humid weather experienced in the Toronto region in particular. A question was raised by the Executive Director of the Independent Power Producers' Society of Ontario (IPPSO) as to whether there are enough incentives for new supply or any unnecessary barriers, in light of the tight reserve margins and little new construction. No major failures or breakdowns were experienced, which proved to be a real test of the newly created market system. However, significant spikes in hourly prices and uplift charges were felt in July. At times, power had to be purchased from outside the province, and the prices paid for this power were much higher than the prices paid to in-province producers. There was proof that consumers were not adjusting their consumption in response to fluctuations in the prices, as had been expected by the system's designers. Pre-dispatch and real-time prices were disconnected, and large consumers did not benefit from reliable day-ahead price projections. Another major issue raised was that of finding new power supplies. The situation is not yet desperate as Ontario can trade electricity with other regions, but it is felt that the situation should be examined sooner rather than later. Import pricing is an issue that needs to be addressed now. The IPPSO is concerned that no new generating capacity plans are in the works at this time. The barriers to new investment in Ontario's generation must be identified, and a meeting between market participants and government should be scheduled for that purpose. A review of the presentation of price-related information is being conducted to allow consumers to adjust their consumption, cutting back when prices soar and saving money by the same token. It is felt that a more comfortable surplus of supply would either reduce or eliminate these problems. Some of the reasons believed to affect the level of investment in

  9. Hot weather stresses system : more supply needed

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2002-08-01

    Signs of stress in Ontario's electric system were revealed this summer, mainly as a result of the hot and humid weather experienced in the Toronto region in particular. A question was raised by the Executive Director of the Independent Power Producers' Society of Ontario (IPPSO) as to whether there are enough incentives for new supply or any unnecessary barriers, in light of the tight reserve margins and little new construction. No major failures or breakdowns were experienced, which proved to be a real test of the newly created market system. However, significant spikes in hourly prices and uplift charges were felt in July. At times, power had to be purchased from outside the province, and the prices paid for this power were much higher than the prices paid to in-province producers. There was proof that consumers were not adjusting their consumption in response to fluctuations in the prices, as had been expected by the system's designers. Pre-dispatch and real-time prices were disconnected, and large consumers did not benefit from reliable day-ahead price projections. Another major issue raised was that of finding new power supplies. The situation is not yet desperate as Ontario can trade electricity with other regions, but it is felt that the situation should be examined sooner rather than later. Import pricing is an issue that needs to be addressed now. The IPPSO is concerned that no new generating capacity plans are in the works at this time. The barriers to new investment in Ontario's generation must be identified, and a meeting between market participants and government should be scheduled for that purpose. A review of the presentation of price-related information is being conducted to allow consumers to adjust their consumption, cutting back when prices soar and saving money by the same token. It is felt that a more comfortable surplus of supply would either reduce or eliminate these problems. Some of the reasons believed to affect the

  10. Simulation and analysis of main steam control system based on heat transfer calculation

    Science.gov (United States)

    Huang, Zhenqun; Li, Ruyan; Feng, Zhongbao; Wang, Songhan; Li, Wenbo; Cheng, Jiwei; Jin, Yingai

    2018-05-01

    In this paper, after thermal power plant 300MW boiler was studied, mat lab was used to write calculation program about heat transfer process between the main steam and boiler flue gas and amount of water was calculated to ensure the main steam temperature keeping in target temperature. Then heat transfer calculation program was introduced into Simulink simulation platform based on control system multiple models switching and heat transfer calculation. The results show that multiple models switching control system based on heat transfer calculation not only overcome the large inertia of main stream temperature, a large hysteresis characteristic of main stream temperature, but also adapted to the boiler load changing.

  11. Steam systems in industry: Energy use and energy efficiency improvement potentials

    International Nuclear Information System (INIS)

    Einstein, Dan; Worrell, Ernst; Khrushch, Marta

    2001-01-01

    Steam systems are a part of almost every major industrial process today. Thirty-seven percent of the fossil fuel burned in US industry is burned to produce steam. In this paper we will establish baseline energy consumption for steam systems. Based on a detailed analysis of boiler energy use we estimate current energy use in boilers in U.S. industry at 6.1 Quads (6.4 EJ), emitting almost 66 MtC in CO(sub 2) emissions. We will discuss fuels used and boiler size distribution. We also describe potential savings measures, and estimate the economic energy savings potential in U.S. industry (i.e. having payback period of 3 years or less). We estimate the nationwide economic potential, based on the evaluation of 16 individual measures in steam generation and distribution. The analysis excludes the efficient use of steam and increased heat recovery. Based on the analysis we estimate the economic potential at 18-20% of total boiler energy use, resulting in energy savings approximately 1120-1190 TBtu ( 1180-1260 PJ). This results in a reduction of CO(sub 2) emissions equivalent to 12-13 MtC

  12. District heating and cooling systems for communities through power-plant retrofit and distribution network. Volume 2. Tasks 1-3. Final report. [Downtown Toledo steam system

    Energy Technology Data Exchange (ETDEWEB)

    Watt, J.R.; Sommerfield, G.A.

    1979-08-01

    Each of the tasks is described separately: Task 1 - Demonstration Team; Task 2 - Identify Thermal Energy Source(s) and Potential Service Area(s); and Task 3 - Energy Market Analysis. The purpose of the project is to establish and implement measures in the downtown Toledo steam system for conserving scarce fuel supplies through cogeneration, by retrofit of existing base- or intermediate-loaded electric-generating plants to provide for central heating and cooling systems, with the ultimate purpose of applying the results to other communities. For Task 1, Toledo Edison Company has organized a Demonstration Team (Battelle Columbus Laboratories; Stone and Webster; Ohio Dept. of Energy; Public Utilities Commission of Ohio; Toledo Metropolitan Area Council of Governments; and Toledo Edison) that it hopes has the expertise to evaluate the technical, legal, economic, and marketing issues related to the utilization of by-product heat from power generation to supply district heating and cooling services. Task 2 gives a complete technical description of the candidate plant(s), its thermodynamic cycle, role in load dispatch, ownership, and location. It is concluded that the Toledo steam distribution system can be the starting point for developing a new district-heating system to serve an expanding market. Battelle is a member of the team employed as a subcontractor to complete the energy market analysis. The work is summarized in Task 3. (MCW)

  13. Unattended nuclear systems for local energy supply

    International Nuclear Information System (INIS)

    Lynch, G.F.; Bancroft, A.R.; Hilborn, J.W.; McDougall, D.S.; Ohta, M.M.

    1988-02-01

    This paper describes recent developments in a small nuclear heat and electricity production system - the SLOWPOKE Energy System - that make it possible to locate the system close to the load, and that could have a major impact on local energy supply. The most important unique features arising from these developments are walk-away safety and the ability to operate in an unattended mode. Walk-away safety means that radiological protection is provided by intrinsic characteristics and does not depend on either engineered safety systems or operator intervention. This, in our view, is essential to public acceptance. The capability for unattended operation results from self-regulation; however, the performance can be remotely monitored. The SLOWPOKE Energy System consists of a water-filled pool, operating at atmospheric pressure, which cools and moderates a beryllium-reflected thermal reactor that is fuelled with 100 to 400 kg of low-enriched uranium. The pool water also provides shielding from radioactive materials trapped in the fuel. Heat is drawn from the pool and transferred either to a building hot-water distribution system or to an organic liquid which is converted to vapour to drive a turbine-generator unit. Heating loads between 2 qnd 10 MWt, and electrical loads up to 1 MWe can be satisfied. SLOWPOKE is a dramatic departure from conventional nuclear power reactors. Its nuclear heat source is intrinsically simple, having only one moving part: a solid neutron absorber which is slowly withdrawn from the reactor to balance the fuel burnup. Its power is self-regulated and excessive heat production cannot occur, even for the most severe combinations of system failure. Cooling of the fuel is assured by natural physical processes that do not depend on mechanical components such as pumps. These intrinsic characteristics assure public safety and ultra high reliability

  14. Unattended nuclear systems for local energy supply

    International Nuclear Information System (INIS)

    Lynch, G.F.; Bancroft, A.R.; Hilborn, J.W.; McDougall, D.S.; Ohta, M.M.

    1986-10-01

    This paper describes recent developments in a small nuclear heat and electricity production system - the SLOWPOKE energy system - that make it possible to locate the system close to the load, and that could have a major impact on local energy supply. The most important unique features arising from these developments are walk-away safety and the ability to operate in an unattended mode. Walk-away safety means that radiological protection is provided by intrinsic characteristics and does not depend on either engineered safety systems or operator intervention. This, in our view, is essential to public acceptance. The capability for unattended operation results from self-regulation, however the performance can be remotely monitored. The SLOWPOKE energy system consists of a water-filled pool, operating at atmospheric pressure, which cools and moderates a beryllium-reflected thermal reactor that is fuelled with 100 to 400 kg of low enriched uranium. The pool water also provides shielding from radioactive materials trapped in the fuel. Heat is drawn from the pool and transferred either to a building hot-water distribution system or to an organic liquid which is converted to vapour to drive a turbine-generator unit. Heating loads between 2 and 10 MWt, and electrical loads up to 1 MWe can be satisfied. SLOWPOKE is a dramatic departure from conventional nuclear power reactors. Its nuclear heat source is intrinsically simple, having only one moving part: a solid neutron absorber which is slowly withdrawn from the reactor to balance the fuel burnup. Its power is self-regulated and excessive heat production cannot occur, even for the most severe combinations of system failure. Cooling of the fuel is assured by natural physical processes that do not depend on mechanical components such as pumps. These intrinsic characteristics assure public safety and ultra high reliability. (author)

  15. An expert system for diagnostics and estimation of steam turbine components condition

    Science.gov (United States)

    Murmansky, B. E.; Aronson, K. E.; Brodov, Yu. M.

    2017-11-01

    The report describes an expert system of probability type for diagnostics and state estimation of steam turbine technological subsystems components. The expert system is based on Bayes’ theorem and permits to troubleshoot the equipment components, using expert experience, when there is a lack of baseline information on the indicators of turbine operation. Within a unified approach the expert system solves the problems of diagnosing the flow steam path of the turbine, bearings, thermal expansion system, regulatory system, condensing unit, the systems of regenerative feed-water and hot water heating. The knowledge base of the expert system for turbine unit rotors and bearings contains a description of 34 defects and of 104 related diagnostic features that cause a change in its vibration state. The knowledge base for the condensing unit contains 12 hypotheses and 15 evidence (indications); the procedures are also designated for 20 state parameters estimation. Similar knowledge base containing the diagnostic features and faults hypotheses are formulated for other technological subsystems of turbine unit. With the necessary initial information available a number of problems can be solved within the expert system for various technological subsystems of steam turbine unit: for steam flow path it is the correlation and regression analysis of multifactor relationship between the vibration parameters variations and the regime parameters; for system of thermal expansions it is the evaluation of force acting on the longitudinal keys depending on the temperature state of the turbine cylinder; for condensing unit it is the evaluation of separate effect of the heat exchange surface contamination and of the presence of air in condenser steam space on condenser thermal efficiency performance, as well as the evaluation of term for condenser cleaning and for tube system replacement and so forth. With a lack of initial information the expert system enables to formulate a diagnosis

  16. Future development of large steam turbines

    International Nuclear Information System (INIS)

    Chevance, A.

    1975-01-01

    An attempt is made to forecast the future of the large steam turbines till 1985. Three parameters affect the development of large turbines: 1) unit output; and a 2000 to 2500MW output may be scheduled; 2) steam quality: and two steam qualities may be considered: medium pressure saturated or slightly overheated steam (light water, heavy water); light enthalpie drop, high pressure steam, high temperature; high enthalpic drop; and 3) the quality of cooling supply. The largest range to be considered might be: open system cooling for sea-sites; humid tower cooling and dry tower cooling. Bi-fluid cooling cycles should be also mentioned. From the study of these influencing factors, it appears that the constructor, for an output of about 2500MW should have at his disposal the followings: two construction technologies for inlet parts and for high and intermediate pressure parts corresponding to both steam qualities; exhaust sections suitable for the different qualities of cooling supply. The two construction technologies with the two steam qualities already exist and involve no major developments. But, the exhaust section sets the question of rotational speed [fr

  17. Naval Logistics Integration Through Interoperable Supply Systems

    Science.gov (United States)

    2014-06-13

    owe special gratitude to the Marines of 3rd Supply Battalion for supporting me as the Supply Management Unit Officer-in-charge, Supply Company ...XML) that works in conjunction with EDI, DLMS transactions can be quickly converted via Business-to-Business ( B2B ) integration software into an...purchasing user’s guide release 11i. Oracle Corporation. ———. 2011. Oracle B2B datasheet. http://www.oracle.com/technetwork/ middleware/soasuite/ b2b

  18. Steam drum level dynamics in a multiple loop natural circulation system of a pressure-tube type boiling water reactor

    International Nuclear Information System (INIS)

    Jain, Vikas; Kulkarni, P.P.; Nayak, A.K.; Vijayan, P.K.; Saha, D.; Sinha, R.K.

    2011-01-01

    Highlights: → We have highlighted the problem of drum level dynamics in a multiple loop type NC system using RELAP5 code. → The need of interconnections in steam and liquid spaces close to drum is established. → The steam space interconnections equalize pressure and liquid space interconnections equalize level. → With this scheme, the system can withstand anomalous conditions. → However, the controller is found to be inevitable for inventory balance. - Abstract: Advanced Heavy Water Reactor (AHWR) is a pressure tube type boiling water reactor employing natural circulation as the mode of heat removal under all the operating conditions. Main heat transport system (MHTS) of AHWR is essentially a multi-loop natural circulation system with all the loops connected to each other. Each loop of MHTS has a steam drum that provides for gravity based steam-water separation. Steam drum level is a very critical parameter especially in multi-loop natural circulation systems as large departures from the set point may lead to ineffective separation of steam-water or may affect the driving head. However, such a system is susceptible to steam drum level anomalies under postulated asymmetrical operating conditions among the different quadrants of the core like feedwater flow distribution anomaly among the steam drums or power anomaly among the core quadrants. Analyses were carried out to probe such scenarios and unravel the underlying dynamics of steam drum level using system code RELAP5/Mod3.2. In addition, a scheme to obviate such problem in a passive manner without dependence on level controller was examined. It was concluded that steam drums need to be connected in the liquid as well as steam space to make the system tolerant to asymmetrical operating conditions.

  19. Improving Steam System Performance: A Sourcebook for Industry, Second Edition (Book) (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    2012-10-01

    Improving Steam System Performance: A Sourcebook for Industry was developed for the U.S. Department of Energy's (DOE) Advanced Manufacturing Office (AMO), formerly the Industrial Technologies Program. AMO undertook this project as a series of sourcebook publications. Other topics in this series include: compressed air systems, pumping systems, fan systems, process heating and motor and drive systems. For more information about program resources, see AMO in the Where to Find Help section of this publication.

  20. Type GQS-1 high pressure steam manifold water level monitoring system

    International Nuclear Information System (INIS)

    Li Nianzu; Li Beicheng; Jia Shengming

    1993-10-01

    The GQS-1 high pressure steam manifold water level monitoring system is an advanced nuclear gauge that is suitable for on-line detecting and monitor in high pressure steam manifold water level. The physical variable of water level is transformed into electrical pulses by the nuclear sensor. A computer is equipped for data acquisition, analysis and processing and the results are displayed on a 14 inch color monitor. In addition, a 4 ∼ 20 mA output current is used for the recording and regulation of water level. The main application of this gauge is for on-line measurement of high pressure steam manifold water level in fossil-fired power plant and other industries

  1. The application of MVPACK to the design of multivariable control systems for a nuclear steam generator

    International Nuclear Information System (INIS)

    Hinds, H.W.

    1985-05-01

    MVPACK is a user-friendly software package that combines a powerful capability to design and analyze complex multivariable control systems, both in state space and transfer function form, with an ease of application. MVPACK is a set of interactive modules that appears to the user as a high-level calculator. It is composed of a database, interaction methods, a mathematical library, and an extensive collection of design algorithms including: order reduction of linear models; pole shifting with output feedback; modal control; optimal control with stochastic state estimation; and the inverse Nyquist array method. The subject of this paper is the design of multivariable controllers for a nuclear steam generator. The available outputs of the 15th-order model are steam pressure and water level; control inputs are steam and feedwater flows. Four of the design techniques implemented in the MVPACK module are outlined and then applied to this model

  2. Digitization and simulation realization of full range control system for steam generator water level

    International Nuclear Information System (INIS)

    Qian Hong; Ye Jianhua; Qian Fei; Li Chao

    2010-01-01

    In this paper, a full range digital control system for the steam generator water level is designed by a control scheme of single element control and three-element cascade feed-forward control, and the method to use the software module configuration is proposed to realize the water level control strategy. This control strategy is then applied in the operation of the nuclear power simulation machine. The simulation result curves indicate that the steam generator water level maintains constant at the stable operation condition, and when the load changes, the water level changes but finally maintains the constant. (authors)

  3. Dynamic modeling and simulation of EBR-II steam generator system

    International Nuclear Information System (INIS)

    Berkan, R.C.; Upadhyaya, B.R.

    1989-01-01

    This paper presents a low order dynamic model of the Experimental breeder Reactor-II (EBR-II) steam generator system. The model development includes the application of energy, mass and momentum balance equations in state-space form. The model also includes a three-element controller for the drum water level control problem. The simulation results for low-level perturbations exhibit the inherently stable characteristics of the steam generator. The predictions of test transients also verify the consistency of this low order model

  4. Abort kicker power supply systems at Fermilab

    International Nuclear Information System (INIS)

    Krafczyk, G.; Dugan, G.; Harrison, M.; Koepke, K.; Tilles, E.

    1985-06-01

    Over the past several years, Fermilab has been operating with a single turn proton abort system in both the superconducting Tevatron and the conventional Main Ring. The abort kicker power supply for this system discharges a lumped capacitance into the inductive magnet load, causing the beam to enter the abort channel. The characteristics of this current waveform are defined by the requirements of the machine operation. The standard fixed target running mode calls for 12 booster batches of beam which leaves a rotating gap in the beams of approx.1.8 μs. The current waveform is required to rise to 90% of I/sub max/ in this time to avoid beam loss from partially deflected beam. Aperture limitations in both the accelerator and the abort channel demand that the current in the magnets stays above this 90% I/sub max/ for the 21 μs needed to ensure all the beam has left the machine. The 25 mm displacement needed to cleanly enter the abort channel at 1 TeV corresponds to a maximum current in each of the 4 modules of approx.20 kA. Similar constraints are needed for the Main Ring and Tevatron antiproton abort systems. A unique feature of this design is the high voltage, high current diode assembly used to clip the recharge of the capacitor bank. This allows the current to decay slowly with the L/R time constant of the magnet and diode series combination. Special attention is given to the diode characteristics needed for this passive switching element. Operational experience and proposed upgrades are given for the two operational systems. 2 refs., 4 figs., 1 tab

  5. Abort kicker power supply systems at Fermilab

    International Nuclear Information System (INIS)

    Krafczyk, G.; Dugan, G.; Harrison, M.; Koepke, K.; Tilles, E.

    1985-01-01

    Over the past several years, Fermilab has been operating with a single turn proton abort system in both the superconducting Tevatron and the conventional Main Ring. The abort kicker power supply for this system discharges a lumped capacitance into the inductive magnet load, causing the beam to enter the abort channel. The characteristics of this current waveform are defined by the requirements of the machine operation. The standard fixed target running mode calls for 12 booster batches of beam which leaves a rotating gap in the beam of about1.8 μs. The current waveform is required to rise to 90% of I /SUB max/ in this time to avoid beam loss from partially deflected beam. Aperture limitations in both the accelerator and the abort channel demand that the current in the magnets stays above this 90% I for the 21 μs needed to ensure all the beam has /SUP max/ left the machine. The 25 mm displacement needed to cleanly enter the abort channel at 1 TeV corresponds to a maximum current in each of the 4 modules of about20 kA. Similar constraints are needed for the Main Ring and Tevatron antiproton abort systems. A unique feature of this design is the high voltage, high current diode assembly used to clip the recharge of the capacitor bank. This allows the current to decay slowly with the L/R time constant of the magnet and diode series combination. Special attention will be given to the diode characteristics needed for this passive switching element. Operational experience and proposed upgrades will be given for the two operational systems

  6. Power supply system for KSTAR neutral beam injector

    Energy Technology Data Exchange (ETDEWEB)

    Cho, W., E-mail: franciscocho@nfri.re.kr; Bae, Y.S.; Han, W.S.; Jeong, J.H.; Kim, J.S.; Park, H.T.; Yang, H.L.; Oh, Y.K.; Kwak, J.G.

    2015-10-15

    Highlights: • The power supply system in KSTAR NBI consists of DC power supplies for ion source. • For operation NBI, DC High Voltage based on the low voltage transformer with chopper. • The surge absorber near the ion source limit the energy deposited to accelerator grid. - Abstract: The power supply system in KSTAR neutral beam injector consists of low voltage and high current DC power supplies for plasma generator of ion source and high voltage and high current DC power supply for accelerator grid system. The arc discharge is initiated by an arc power supply supplying the arc voltage between the chamber wall and 12 filaments which are heated by individual filament power supply. The negative output of arc power supply is common to each positive output of 12 filament power supplies. To interrupt the arc discharging for the fault condition of the arc current unbalance, DCCT current monitor is placed at the positive output cable of the filament power supply. The plasma grid (G1) power supply has the maximum capability of 120 kV/70 A which consists of low voltage regulator with IGBT-switched chopper array system for the voltage control in unit of 600 V and the high voltage rectified transformers to supply DC voltage of 20 kV, 30 kV, and 50 kV. The output voltage of the G1 power supply is also connected to the input of the voltage divider system which supplies the gradient voltage to the gradient grid (G2) in the range of 80–90% of G1 voltage by changing tap of winding resistors in unit of 1%. The charged G1 voltage is turned on and off by the high voltage switch (HVS) system consisting of MOSFET fast semiconductor switches which can immediately be opened less than 1 μs when the ion source grid breakdown occurs. The decelerating grid (G3) power supply is inverter system using capacitor-charge power supply to supply maximum −5 kV/5 A. The important component in power supply system is the surge absorber near the ion source to limit the arc energy deposited to

  7. Power supply system for KSTAR neutral beam injector

    International Nuclear Information System (INIS)

    Cho, W.; Bae, Y.S.; Han, W.S.; Jeong, J.H.; Kim, J.S.; Park, H.T.; Yang, H.L.; Oh, Y.K.; Kwak, J.G.

    2015-01-01

    Highlights: • The power supply system in KSTAR NBI consists of DC power supplies for ion source. • For operation NBI, DC High Voltage based on the low voltage transformer with chopper. • The surge absorber near the ion source limit the energy deposited to accelerator grid. - Abstract: The power supply system in KSTAR neutral beam injector consists of low voltage and high current DC power supplies for plasma generator of ion source and high voltage and high current DC power supply for accelerator grid system. The arc discharge is initiated by an arc power supply supplying the arc voltage between the chamber wall and 12 filaments which are heated by individual filament power supply. The negative output of arc power supply is common to each positive output of 12 filament power supplies. To interrupt the arc discharging for the fault condition of the arc current unbalance, DCCT current monitor is placed at the positive output cable of the filament power supply. The plasma grid (G1) power supply has the maximum capability of 120 kV/70 A which consists of low voltage regulator with IGBT-switched chopper array system for the voltage control in unit of 600 V and the high voltage rectified transformers to supply DC voltage of 20 kV, 30 kV, and 50 kV. The output voltage of the G1 power supply is also connected to the input of the voltage divider system which supplies the gradient voltage to the gradient grid (G2) in the range of 80–90% of G1 voltage by changing tap of winding resistors in unit of 1%. The charged G1 voltage is turned on and off by the high voltage switch (HVS) system consisting of MOSFET fast semiconductor switches which can immediately be opened less than 1 μs when the ion source grid breakdown occurs. The decelerating grid (G3) power supply is inverter system using capacitor-charge power supply to supply maximum −5 kV/5 A. The important component in power supply system is the surge absorber near the ion source to limit the arc energy deposited to

  8. Multiplicity in public health supply systems: a learning agenda.

    Science.gov (United States)

    Bornbusch, Alan; Bates, James

    2013-08-01

    Supply chain integration-merging products for health programs into a single supply chain-tends to be the dominant model in health sector reform. However, multiplicity in a supply system may be justified as a risk management strategy that can better ensure product availability, advance specific health program objectives, and increase efficiency.

  9. Design and construction of a steam generator with feedback

    International Nuclear Information System (INIS)

    Camargo, Camila C.; Placco, Guilherme M.; Guimaraes, Lamartine N.F.

    2013-01-01

    The EARTH project aims to develop technologies to design and build systems that generate electricity in space, using microreactors. One of the activities within the TERRA project aims to build a closed thermal cycle Rankine type in order to test a Tesla turbine type. The objective of this work is to design and build a steam generator with feedback, which should ensure a satisfactory range of steam supply, security system, feedback system and heating system

  10. Fluid transient analysis and design considerations in TVA PWR feedwater systems and steam generators

    International Nuclear Information System (INIS)

    Kelley, B.T.

    1979-01-01

    TVA has evaluated a number of fluid transients in an effort to discover areas of potential problems and to improve overall unit operation. The transients recently or currently being evaluated fall into four major areas - accident analyses, fast valving, heater drain systems, and steam generators. A discussion of each area follows

  11. Acceptance test guideline for steam turbine control systems. Anahmerichtlinie fuer Regel- und Steuereinrichtungen von Dampfturbinen

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    The acceptances to be obtained during the first operational run, refer to measures proving the functional integrity of the turbine control system and assuring the compliance with the maximum allowable overspeed in case of lead changes or perturbations. The Guideline concerns essentially speed, power, and pressure controllers coupled to generators. It may be appropriately extended to steam turbines serving other purposes.

  12. System for removing sludges from a steam generator

    International Nuclear Information System (INIS)

    Hickman, R.A.; Tolino, R.W.

    1977-01-01

    The invention relates to a process for removing sludge from a steam generator comprising a tube plate at the bottom end of a cylinder and a cluster of heat exchange tubes fitted to this tube plate and extending upwards from it. The cylinder has an access opening above this tube plate. A liquid jet is applied at a tangent to the cylinder above the tube plate so as to form a cicumferential flow of liquid at the external end of this plate. This flow is taken up and sucked out of the cylinder by a suction appliance and, at the same time, a nozzle with holes for liquid jets is moved crosswise to these tubes above the tube plate whilst directing a liquid jet against the tubes and towards the cicumferential liquid flow so as to wash away any deposits detached from the lower ends of the tubes and located in this circular flow of liquid to be immediately removed by the suction appliance [fr

  13. Instrumental system for the quick relief of surface temperatures in fumaroles fields and steam heated soils

    Science.gov (United States)

    Diliberto, Iole; Cappuzzo, Santo; Inguaggiato, Salvatore; Cosenza, Paolo

    2014-05-01

    .g. in mofettes and diffuse degassing areas). The occurrence of thermal anomalies at the surface often reveals that a process of steam condensation is occurring below the ground and that CO2 fluxes are being released on the surface. A thermal map of steam heated grounds therefore highlights boundaries of underground steam advection and also the more suitable sites for geochemical monitoring. Pirogips has been assembled for the quick acquisition of surface parameters related to the exhaling activity of volcanic systems. It has been formerly tested in a controlled environment, after in the well known fumaroles areas of Vulcano island, and then in the volcanic system El Machin (Colombia) for the field survey preliminary to the installation of new monitoring stations. The preliminary test and the first field experiences confirmed that pirogips acquires the surface temperatures quickly and with good detail. The combination of sensors supplies the advantage of in situ methods (i.e. accuracy of the direct measurement by thermocouple) and those of ground-based remote sensing techniques (i.e. quickness of measurement process), at the same time reducing the main disadvantages of each method. A home-made data-logger combines the acquired parameters and returns a data-string allowing an easy visualization of acquired data on geo-referenced maps. The string of data returns the position of acquisition (lat, long, WGS84), surface temperature (either derived by the pyrometer and by thermocouple), ambient temperature, barometric pressure and air moisture. -References -Diliberto I.S., Gurrieri S., Valenza M. (2002) Relationships between diffuse CO2 emissions and volcanic activity on the island of Vulcano (Aeolian Islands, Italy) during the period 1984-1994 Bulletin of Volcanology vol 64: 219-228. -Diliberto I.S., (2013) Time series analysis of high temperature fumaroles monitored on the island of Vulcano (Aeolian Archipelago, italy). Journal of Volcanology and Geothermal Research

  14. Magnetically switched power supply system for lasers

    Science.gov (United States)

    Pacala, Thomas J. (Inventor)

    1987-01-01

    A laser power supply system is described in which separate pulses are utilized to avalanche ionize the gas within the laser and then produce a sustained discharge to cause the gas to emit light energy. A pulsed voltage source is used to charge a storage device such as a distributed capacitance. A transmission line or other suitable electrical conductor connects the storage device to the laser. A saturable inductor switch is coupled in the transmission line for containing the energy within the storage device until the voltage level across the storage device reaches a predetermined level, which level is less than that required to avalanche ionize the gas. An avalanche ionization pulse generating circuit is coupled to the laser for generating a high voltage pulse of sufficient amplitude to avalanche ionize the laser gas. Once the laser gas is avalanche ionized, the energy within the storage device is discharged through the saturable inductor switch into the laser to provide the sustained discharge. The avalanche ionization generating circuit may include a separate voltage source which is connected across the laser or may be in the form of a voltage multiplier circuit connected between the storage device and the laser.

  15. Measure Guideline: Steam System Balancing and Tuning for Multifamily Residential Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Choi, J.; Ludwig, P.; Brand, L.

    2013-04-01

    This report was written as a resource for professionals involved in multifamily audits, retrofit delivery, and program design, as well as for building owners and contractors. It is intended to serve as a guide for those looking to evaluate and improve the efficiency and operation of one-pipe steam heating systems. In centrally heated multifamily buildings with steam or hydronic systems, the cost of heat for tenants is typically absorbed into the owner's operating costs. Highly variable and rising energy costs have placed a heavy burden on landlords. In the absence of well-designed and relevant efficiency efforts, increased operating costs would be passed on to tenants who often cannot afford those increases. Misinvestment is a common problem with older heating systems -- multiple contractors may inadequately or inappropriately upgrade parts of systems and reduce system functionality and efficiency, or the system has not been properly maintained.

  16. JT-60SA power supply system

    International Nuclear Information System (INIS)

    Coletti, A.; Baulaigue, O.; Cara, P.; Coletti, R.; Ferro, A.; Gaio, E.; Matsukawa, M.; Novello, L.; Santinelli, M.; Shimada, K.; Starace, F.; Terakado, T.; Yamauchi, K.

    2011-01-01

    The paper describes the main features of the Superconducting Magnets Power Supply to generate the toroidal and poloidal magnetic fields in JT-60SA tokamak, with special regard to coil current regulation mode and magnets protection.

  17. Geothermal heat-pump systems of heat supply

    International Nuclear Information System (INIS)

    Vasil'ev, G.P.

    2004-01-01

    The data on the multilayer operation of the objects, located in the climatic conditions of the central area of Russia and equipped with the geothermal heat-pumping systems of the heat supply are presented. The results of the analytical studies on evaluating the geothermal heat-pumping systems of the heat supply integration efficiency into the structure of the energy supply system, prevailing in the country, are presented [ru

  18. IEA Response System for Oil Supply Emergencies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-15

    Emergency response to oil supply disruptions has remained a core mission of the International Energy Agency since its founding in 1974. This information pamphlet explains the decisionmaking process leading to an IEA collective action, the measures available -- focusing on stockdraw -- and finally, the historical background of major oil supply disruptions and the IEA response to them. It also demonstrates the continuing need for emergency preparedness, including the growing importance of engaging key transition and emerging economies in dialogue about energy security.

  19. IEA Response System for Oil Supply Emergencies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-15

    Emergency response to oil supply disruptions has remained a core mission of the International Energy Agency since its founding in 1974. This information pamphlet explains the decisionmaking process leading to an IEA collective action, the measures available -- focusing on stockdraw -- and finally, the historical background of major oil supply disruptions and the IEA response to them. It also demonstrates the continuing need for emergency preparedness, including the growing importance of engaging key transition and emerging economies in dialogue about energy security.

  20. Fast-Valving of Large Steam Turbine Units as a Means of Power System Security Enhancement

    OpenAIRE

    Bogdan Sobczak; Robert Rink; Rafał Kuczyński; Robert Trębski

    2014-01-01

    Fast-valving assists in maintaining system stability following a severe transmission system fault by reducing the turbine mechanical power. Fast-valving consists in rapid closing and opening of steam valves in an adequate manner to reduce the generator accelerating power following the recognition of a severe fault. FV can be an effective and economical method of meeting the performance requirements of a power system in the presence of an increase in wind and solar generation in the power syst...

  1. Systems thinking benefits in supply change management:an illustration of the viable systems model in a supply chain

    OpenAIRE

    Chronéer, Diana; Mirijamdotter, Anita

    2009-01-01

    Existing product development models are solely an organisational matter. They do not take into consideration the whole supply chain and its different actors. We investigate in this paper how Supply Chain Management (SCM) and Viable System Model (VSM) can support and create an effective use of information in product development and hence identify critical linkages in the supply chain. The aim is to introduce VSM as a framework that enable an analysis of company's supply chains and visualize vi...

  2. Proposal and assessment of a novel integrated CCHP system with biogas steam reforming using solar energy

    International Nuclear Information System (INIS)

    Su, Bosheng; Han, Wei; Jin, Hongguang

    2017-01-01

    Highlights: •A novel CCHP system with biogas steam reforming using solar energy is raised. •Chemical and physical energy of biogas is efficiently used in a cascaded way. •The energy quality of concentrating solar heat is promoted in the system. •A parametric analysis is adopted to optimize the thermodynamic performance. •A typical-day study is conducted to explore the general operation features. -- Abstract: The conventional way to utilize biogas either is energy-intensive due to biogas upgrading or causes huge waste of energy grade and environmental pollution by direct burning. This paper proposes a biogas and solar energy-assisted combined cooling, heating and power (BSCCHP) system that upgrades the caloric value of biogas before combustion by introducing a thermochemical conversion process that is driven by solar heat. Adopting commercially established technologies including steam reforming and parabolic dish concentrators, the system exhibits an enhanced system exergy efficiency, and the technology considerably reduces the direct CO 2 footprint and saves depletable fossil fuel. With a solar thermal share of 22.2%, the proposed system not only has a high net solar-to-product thermal and exergy efficiency of 46.80% and 26.49%, respectively, but also results in a commensurate 18.27% reduction of the direct CO 2 footprint compared with the reference individual systems. The effect of critical parameters in the biogas steam reforming process on the system performance was studied. A proper selection of the steam/carbon ratio leads to the optimal direct CO 2 footprint and system exergy efficiency. Pursuing a very high conversion of biogas by improving the reforming temperature is not a wise choice from a system perspective. Finally, a typical-day dynamic simulation was conducted to preliminarily explore the general operation features. This study may provide a new way to efficiently use the renewable energy in the distributed energy system.

  3. Power supply and stabilization of the supply system on board using decentralized voltage rectifiers

    Energy Technology Data Exchange (ETDEWEB)

    Grueb, W; Wegerer, K

    1987-04-01

    The functionally redundant power supply system of the Transrapid 06 II maglev train is described; it comprises four independent, battery-buffered networks and 30 linear generators per train section. Voltage rectifiers adapt the velocity- and load-dependent linear generator voltage to the 440 V d.c. networks and assure dynamic stabilisation as well as buffer battery loading. The result is a high-reliability power supply system on board with optimum utilisation of the power supplied by the linear generators while the train is running.

  4. Monitoring the Vulnerability of Energy Supply System

    International Nuclear Information System (INIS)

    Gnansonounou, E.

    2006-01-01

    Due to the increasing complexity of the world evolution, the public decision makers, the energy supply industry and the consumers in industrialised countries are more and more sensitive to the vulnerability of energy supply. The emergence of new big consumer countries and the perspective of oil and gas depletion at the end of the current century raise the concerns about how to share fairly the remaining resources for the common and sustainable development of the mankind. Erratic energy prices discourage investment and delay the energy transition. Voluntary measures are needed mainly in industrialised countries in order to develop alternative and sustainable energy sources and to avoid world struggle for energy procurement. In this contribution a synthetic energy vulnerability index is defined for monitoring energy supply vulnerability. The proposed index is based on energy intensity, oil and gas import dependency, CO 2 content of primary energy supply, electricity supply vulnerability and non-diversity in transport fuels. The preliminary assessment of this synthetic index for selected industrialised countries provides promising results that need however further refinement.(author)

  5. Steam generation: fossil-fired systems: utility boilers; industrial boilers; boiler auxillaries; nuclear systems: boiling water; pressurized water; in-core fuel management; steam-cycle systems: condensate/feedwater; circulating water; water treatment

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    A survey of development in steam generation is presented. First, fossil-fired systems are described. Progress in the design of utility and industrial boilers as well as in boiler auxiliaries is traced. Improvements in coal pulverizers, burners that cut pollution and improve efficiency, fans, air heaters and economisers are noted. Nuclear systems are then described, including the BWR and PWR reactors, in-core fuel management techniques are described. Finally, steam-cycle systems for fossil-fired and nuclear power plants are reviewed. Condensate/feedwater systems, circulating water systems, cooling towers, and water treatment systems are discussed

  6. Fast-Valving of Large Steam Turbine Units as a Means of Power System Security Enhancement

    Directory of Open Access Journals (Sweden)

    Bogdan Sobczak

    2014-03-01

    Full Text Available Fast-valving assists in maintaining system stability following a severe transmission system fault by reducing the turbine mechanical power. Fast-valving consists in rapid closing and opening of steam valves in an adequate manner to reduce the generator accelerating power following the recognition of a severe fault. FV can be an effective and economical method of meeting the performance requirements of a power system in the presence of an increase in wind and solar generation in the power system, newly connected large thermal units and delaying of building new transmission lines. The principle of fast-valving and advantages of applying this technique in large steam turbine units was presented in the paper. Effectiveness of fast-valving in enhancing the stability of the Polish Power Grid was analyzed. The feasibility study of fast-valving application in the 560 MW unit in Kozienice Power Station (EW SA was discussed.

  7. Units 3 and 4 steam generators new water level control system

    International Nuclear Information System (INIS)

    Dragoev, D.; Genov, St.

    2001-01-01

    The Steam Generator Water Level Control System is one of the most important for the normal operation systems, related to the safety and reliability of the units. The main upgrading objective for the SG level and SGWLC System modernization is to assure an automatic maintaining of the SG level within acceptable limits (below protections and interlocks) from 0% to 100% of the power in normal operation conditions and in case of transients followed by disturbances in the SG controlled parameters - level, steam flow, feedwater flow and/or pressure/temperature. To achieve this objective, the computerized controllers of new SG water level control system follows current computer control technology and is implemented together with replacement of the feedwater control valves and the needed I and C equipment. (author)

  8. Development of the double-wall-tube steam generator. Evaluation of inner tube leak detection system

    International Nuclear Information System (INIS)

    Teraoku, Takuji; Kisohara, Naoyuki

    1995-01-01

    A double-wall-tube steam generator (DWT-SG) is considered to have possibility of eliminating a secondary heat transport system to realize a reliable and simplified FBR plant. Thus, basic tests for inner/outer tube leak detection and prototypical leak tests by use of the 1MWt DWT-SG model have been performed to evaluate the feasibility of DWT-SG. Their results demonstrated that the inner leak detection system can definitely detect a steam leak from an inner tube flaw. Analyses of the inner tube leak and detection behavior obtained in the 1MWt DWT-SG test enabled to estimate the performance of the inner tube detection system of the commercial DWT-SG system. (author)

  9. System Dynamics Modeling for Supply Chain Information Sharing

    Science.gov (United States)

    Feng, Yang

    In this paper, we try to use the method of system dynamics to model supply chain information sharing. Firstly, we determine the model boundaries, establish system dynamics model of supply chain before information sharing, analyze the model's simulation results under different changed parameters and suggest improvement proposal. Then, we establish system dynamics model of supply chain information sharing and make comparison and analysis on the two model's simulation results, to show the importance of information sharing in supply chain management. We wish that all these simulations would provide scientific supports for enterprise decision-making.

  10. Investigation of a combined gas-steam system with flue gas recirculation

    Directory of Open Access Journals (Sweden)

    Chmielniak Tadeusz

    2016-06-01

    Full Text Available This article presents changes in the operating parameters of a combined gas-steam cycle with a CO2 capture installation and flue gas recirculation. Parametric equations are solved in a purpose-built mathematical model of the system using the Ebsilon Professional code. Recirculated flue gases from the heat recovery boiler outlet, after being cooled and dried, are fed together with primary air into the mixer and then into the gas turbine compressor. This leads to an increase in carbon dioxide concentration in the flue gases fed into the CO2 capture installation from 7.12 to 15.7%. As a consequence, there is a reduction in the demand for heat in the form of steam extracted from the turbine for the amine solution regeneration in the CO2 capture reactor. In addition, the flue gas recirculation involves a rise in the flue gas temperature (by 18 K at the heat recovery boiler inlet and makes it possible to produce more steam. These changes contribute to an increase in net electricity generation efficiency by 1%. The proposed model and the obtained results of numerical simulations are useful in the analysis of combined gas-steam cycles integrated with carbon dioxide separation from flue gases.

  11. The EBR-II steam generating system - operation, maintenance, and inspection

    International Nuclear Information System (INIS)

    Buschman, H.W.; Penney, W.H.; Longua, K.J.

    2002-01-01

    The Experimental Breeder Reactor II (EBR-II) has operated for 20 years at the Idaho National Engineering Laboratory near Idaho Falls. EBR-II is a Liquid Metal Fast Breeder Reactor (LMFBR) with integrated power producing capability. EBR-II has operated at a capacity factor over 70% in the past few years. Superheated steam is produced by eight natural circulation evaporators, two superheaters, and a conventional steam drum. Steam throttle conditions are 438 C and 8.62 MPa. The designs of the evaporators and superheaters are essentially identical; both are counterflow units with low pressure nonradioactive sodium on the shell side. During the 20 years of operation, components of the steam generator have been subjected to a variety of inspections including visual, dimensional, and ultrasonic. One superheater was removed from service because of anomalous performance and was replaced with an evaporator which was removed, examined, and converted into a superheater. Overall operating experience of the system has been excellent and essentially trouble free. Inspections have not revealed any conditions that are performance or life limiting. (author)

  12. Evaluation of steam generator U-tube integrity during PWR station blackout with secondary system depressurization

    International Nuclear Information System (INIS)

    Hidaka, Akihide; Asaka, Hideaki; Sugimoto, Jun; Ueno, Shingo; Yoshino, Takehito

    1999-12-01

    In PWR severe accidents such as station blackout, the integrity of steam generator U-tube would be threatened early at the transient among the pipes of primary system. This is due to the hot leg countercurrent natural circulation (CCNC) flow which delivers the decay heat of the core to the structures of primary system if the core temperature increases after the secondary system depressurization. From a view point of accident mitigation, this steam generator tube rupture (SGTR) is not preferable because it results in the direct release of primary coolant including fission products (FP) to the environment. Recent SCDAP/RELAP5 analyses by USNRC showed that the creep failure of pressurizer surge line which results in release of the coolant into containment would occur earlier than SGTR during the secondary system depressurization. However, the analyses did not consider the decay heat from deposited FP on the steam generator U-tube surface. In order to investigate the effect of decay heat on the steam generator U-tube integrity, the hot leg CCNC flow model used in the USNRC's calculation was, at first, validated through the analysis for JAERI's LSTF experiment. The CCNC model reproduced well the thermohydraulics observed in the LSTF experiment and thus the model is mostly reliable. An analytical study was then performed with SCDAP/RELAP5 for TMLB' sequence of Surry plant with and without secondary system depressurization. The decay heat from deposited FP was calculated by JAERI's FP aerosol behavior analysis code, ART. The ART analysis showed that relatively large amount of FPs may deposit on steam generator U-tube inlet mainly by thermophoresis. The SCDAP/RELAP5 analyses considering the FP decay heat predicted small safety margin for steam generator U-tube integrity during secondary system depressurization. Considering associated uncertainties in the analyses, the potential for SGTR cannot be ignored. Accordingly, this should be considered in the evaluation of merits

  13. Supply assurance by versatile energy systems

    International Nuclear Information System (INIS)

    Jaek, W.

    1982-01-01

    The scope of future possibilities of covering the energy requirements of the Federal Republic of Germany has been explained in four sessions handling the topics: structure and covering of the primary energy requirements, contributions of fossil and other energy sources, hydrocarbons and nuclear energy as well as perspectives and political reaction. All energy carriers are required in order to guarantee supply safety, but the industrial nations should make greater use of their know-how and capitals in order to meet short supply of raw material with flexibility. (orig.) [de

  14. An integrated automatic system for the eddy-current testing of the steam generator tubes

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Choi, Seong Su [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    This research project was focused on automation of steam generator tubes inspection for nuclear power plants. ECT (Eddy Current Testing) inspection process in nuclear power plants is classified into 3 subprocesses such as signal acquisition process, signal evaluation process, and inspection planning and data management process. Having been automated individually, these processes were effectively integrated into an automatic inspection system, which was implemented in HP workstation with expert system developed (author). 25 refs., 80 figs.

  15. An integrated automatic system for the eddy-current testing of the steam generator tubes

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Choi, Seong Su [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1996-12-31

    This research project was focused on automation of steam generator tubes inspection for nuclear power plants. ECT (Eddy Current Testing) inspection process in nuclear power plants is classified into 3 subprocesses such as signal acquisition process, signal evaluation process, and inspection planning and data management process. Having been automated individually, these processes were effectively integrated into an automatic inspection system, which was implemented in HP workstation with expert system developed (author). 25 refs., 80 figs.

  16. Supply system with microprocessor control for electron gun

    International Nuclear Information System (INIS)

    Duplin, N.I.; Sergeev, N.N.

    1988-01-01

    Precision supply system for electron gun used in Auger-spectrometer is described. The supply system consists of control and high-voltage parts, made as separate units. Supply high-voltage unit includes system supply module, filament module to supply electron gun cathode and 6 high-volt modules to supply accelerating, modulating and three focusing electrodes of the gun. High-voltage modules have the following characteristics: U-(100-1000)V output voltage, 5x10 -5 U stability, 10 -5 xU pulsation amplitude, J-(0-5)A filament current change range at 10 -4 xJ stability. Control unit including microprocessor, timer and storage devices forms control voltage for all modules and regulates voltage and current of filament at electrodes

  17. City gas supply management system. Toshi gas kyokyu kanri system

    Energy Technology Data Exchange (ETDEWEB)

    Ota, S [Tokyo Gas Co. Ltd., Tokyo (Japan)

    1991-07-05

    Supply and control system of city gas (about 90% is LNG) at Tokyo Gas Company is summarized. The LNG is delivered from the high pressure, A-middle pressure and B-middle pressure stations through the low pressure governors at about 3,000 locations to the low-pressure conduit networks. The information system department uses a large-size general purpose IBM computer as a host computer, control computers at each station, and communication networks consisted mainly of the in-house wireless networks. The trunk lines are all looped, and the important facilities are dualized. Characteristic functions include the supply prediction, which takes into account the past supply and ambient temperature records, a day of the week for a particular date, and demand fluctuation trends; adjustments of each holder based on the prediction and restrictions; and piping network simulation to decide gas manufacturing patterns, and determine reasonability of local construction of complicated conduits. The monitoring and control system as the central nerve includes a quick block-wide operation at an accident from earthquake and the like to prevent wide area disasters. 8 figs., 1 tab.

  18. Photovoltaic / Diesel / Battery Hybrid Power Supply System

    CSIR Research Space (South Africa)

    Tazvinga, Henerica

    2010-10-01

    Full Text Available (SOPAC Miscellaneous Report 406, 2005). The battery bank is cycled frequently, shortening its lifetime. If the inverter fails there is complete loss of power to the load, unless the load can be supplied directly from the diesel generator for emergency purposes....5 Sizing the inverter ............................................................................................... 67 5.6 Sizing the charge Controller ............................................................................... 68 5.7 Sizing...

  19. Optical Fiber Demodulation System with High Performance for Assessing Fretting Damage of Steam Generator Tubes.

    Science.gov (United States)

    Huang, Peijian; Wang, Ning; Li, Junying; Zhu, Yong; Zhang, Jie; Xi, Zhide

    2018-01-12

    In order to access the fretting damage of the steam generator tube (SGT), a fast fiber Fabry-Perot (F-P) non-scanning correlation demodulation system based on a super luminescent light emitting diode (SLED) was performed. By demodulating the light signal coming out from the F-P force sensor, the radial collision force between the SGT and the tube support plate (TSP) was interrogated. For higher demodulation accuracy, the effects of the center wavelength, bandwidth, and spectrum noise of SLED were discussed in detail. Specially, a piezoelectric ceramic transducer (PZT) modulation method was developed to get rid of the interference of mode coupling induced by different types of fiber optics in the demodulation system. The reflectivity of optical wedge and F-P sensor was optimized. Finally, the demodulation system worked well in a 1:1 steam generator test loop and successfully demodulated a force signal of 32 N with a collision time of 2 ms.

  20. The performance of a temperature cascaded cogeneration system producing steam, cooling and dehumidification

    KAUST Repository

    Myat, Aung

    2013-02-01

    This paper discusses the performance of a temperature-cascaded cogeneration plant (TCCP), equipped with an efficient waste heat recovery system. The TCCP, also called a cogeneration system, produces four types of useful energy-namely, (i) electricity, (ii) steam, (iii) cooling and (iv) dehumidification-by utilizing single fuel source. The TCCP comprises a Capstone C-30 micro-turbine that generates nominal capacity of 26 kW of electricity, a compact and efficient waste heat recovery system and a host of waste-heat-activated devices, namely (i) a steam generator, (ii) an absorption chiller, (iii) an adsorption chiller and (iv) a multi-bed desiccant dehumidifier. The performance analysis was conducted under different operation conditions such as different exhaust gas temperatures. It was observed that energy utilization factor could be as high as 70% while fuel energy saving ratio was found to be 28%. © 2013 Desalination Publications.

  1. Systems approach to design of power supply to mines

    Energy Technology Data Exchange (ETDEWEB)

    Shul' ga, Yu I; Voloshko, A V

    1986-09-01

    Optimization of power supplies to underground coal mines in the USSR is evaluated. Systems analysis of power systems is discussed. Power system of a coal mine is treated as an element of the branch power system which forms a subsystem of the local and national power system. Design of a system for computerized control of power supplies to underground coal mines is evaluated. Elements of the system, control equipment, types of information stored and processed by the system as well as economic efficiency of using computerized control for power supply in underground mining are discussed. Recommendations for computer-aided design of power systems and use of computerized control systems for power supply in underground coal mining in the USSR are made.

  2. 30 CFR 36.27 - Fuel-supply system.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuel-supply system. 36.27 Section 36.27 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF... Construction and Design Requirements § 36.27 Fuel-supply system. (a) Fuel tank. (1) The fuel tank shall not...

  3. A supply chain approach to biochar systems [Chapter 2

    Science.gov (United States)

    Nathaniel M. Anderson; Richard D. Bergman; Deborah S. Page-Dumroese

    2017-01-01

    Biochar systems are designed to meet four related primary objectives: improve soils, manage waste, generate renewable energy, and mitigate climate change. Supply chain models provide a holistic framework for examining biochar systems with an emphasis on product life cycle and end use. Drawing on concepts in supply chain management and engineering, this chapter presents...

  4. Sourcing and pricing strategies for two retailers in a decentralized supply chain system under supply disruption

    Directory of Open Access Journals (Sweden)

    M.A. Azarmehr

    2012-01-01

    Full Text Available This paper presents the decentralized supply chain with two suppliers and two competing retailers. It also investigates the sourcing and pricing strategies of two retailers in a decentralized supply chain system under a supply disruption environment. These retailers face their individual stochastic demand markets; however, they compete with each other through a two-stage price and service operation. The interactive dynamics among retailers is characterized, including the existence and uniqueness of the Nash Equilibrium in service and price games demonstrated.

  5. Advanced feed water distributing system for WWER 440 steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Matal, O.; Klinga, J. [Energovyzkum Ltd, Brno (Switzerland); Grazl, K. [Vitkovice s.c., Ostrava (Switzerland); Tischler, J.; Mihalik, M. [SEP Atomove Elektrarne Bohunice (Slovakia)

    1995-12-31

    The original designed feed water distributing system was replaced by an advanced one. The characteristics of both feed water distributing systems have been measured and evaluated. The paper deals with the problems of measurement and evaluation of both feed water distributing system characteristics and comparison of statistical data obtained. (orig.). 3 refs.

  6. Advanced feed water distributing system for WWER 440 steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Matal, O; Klinga, J [Energovyzkum Ltd, Brno (Switzerland); Grazl, K [Vitkovice s.c., Ostrava (Switzerland); Tischler, J; Mihalik, M [SEP Atomove Elektrarne Bohunice (Slovakia)

    1996-12-31

    The original designed feed water distributing system was replaced by an advanced one. The characteristics of both feed water distributing systems have been measured and evaluated. The paper deals with the problems of measurement and evaluation of both feed water distributing system characteristics and comparison of statistical data obtained. (orig.). 3 refs.

  7. Advanced feed water distributing system for WWER 440 steam generators

    International Nuclear Information System (INIS)

    Matal, O.; Klinga, J.; Grazl, K.; Tischler, J.; Mihalik, M.

    1995-01-01

    The original designed feed water distributing system was replaced by an advanced one. The characteristics of both feed water distributing systems have been measured and evaluated. The paper deals with the problems of measurement and evaluation of both feed water distributing system characteristics and comparison of statistical data obtained. (orig.)

  8. Makeup water system performance and impact on PWR steam generator corrosion

    International Nuclear Information System (INIS)

    Bell, M.J.; Sawocha, S.G.; Smith, L.A.

    1984-01-01

    The object of this EPRI-funded project was to assess the possible relation of pressurized water reactor (PWR) steam generator corrosion at fresh water sites to makeup water impurity ingress. Makeup water system design, operation and performance reviews were based on site visits, plant design documents, performance records and grab sample analyses. Design features were assessed in terms of their effect on makeup system performance. Attempts were made to correlate the makeup plant source water, system design characteristics, and typical makeup water qualities to steam generator corrosion observations, particularly intergranular attack (IGA). Direct correlations were not made since many variables are involved in the corrosion process and in the case of IGA, the variables have not been clearly established. However, the study did demonstrate that makeup systems can be a significant source of contaminants that are suspected to lead to both IGA and denting. Additionally, it was noted that typical makeup system performance with respect to organic removal was not good. The role of organics in steam generator damage has not been quantified and may deserve further study

  9. System for measuring of air concentration in air-steam mixture during the transients

    International Nuclear Information System (INIS)

    Gorbenko, Gennady A.; Gakal, Pavlo G.; Epifanov, Konstantin S.; Osokin, Gennady V.; Smirnov, Sergey V.

    2006-01-01

    Description of system for air concentration measuring in air-steam mixture during the transients is represented. Air concentration measuring is based on discrete sampling method. The measuring system consists of sampler, transport pipeline, distributor and six measuring vessels. From the sampler air-steam mixture comes to distributor through transport pipeline and fills consecutively the measuring vessels. The true air concentration in place of measurement was defined based on measured air concentration in samples taken from measuring vessels. For this purpose, the mathematical model of transients in measuring system was developed. Air concentration transient in air-steam mixture in place of measurement was described in mathematical model by air concentration time-dependent function. The function parameters were defined based on air concentration measured in samples taken from measuring vessels. Estimated error of air concentration identification was about 10%. Measuring system was used in experiments on EREC BKV-213 test facility intended for testing of VVER-440/V-213 reactor barbotage-vacuum system

  10. Fabrication of remote steam atomized scrubbers for DWPF off-gas system

    International Nuclear Information System (INIS)

    Nielsen, M.G.; Lafferty, J.D.

    1988-01-01

    The defense waste processing facility (DWPF) is being constructed for the purpose of processing high-level waste from sludge to a vitrified borosilicate glass. In the operation of continuous slurry-fed melters, off-gas aerosols are created by entrainment of feed slurries and the vaporization of volatile species from the molten glass mixture. It is necessary to decontaminate these aerosols in order to minimize discharge of airborne radionuclide particulates. A steam atomized scrubber (SAS) has been developed for DWPF which utilizes a patented hydro- sonic system gas scrubbing method. The Hydro-Sonic System utilizes a steam aspirating-type venturi scrubber that requires very precise fabrication tolerances in order to obtain acceptable decontamination factors. In addition to the process-related tolerances, precision mounting and nozzle tolerances are required for remote service at DWPF

  11. Hydropower recovery in water supply systems: Models and case study

    International Nuclear Information System (INIS)

    Vilanova, Mateus Ricardo Nogueira; Balestieri, José Antônio Perrella

    2014-01-01

    Highlights: • We present hydropower recovery models for water supply systems. • Hydropower recovery potential in water supply systems is highly variable. • The case studied could make the supply systems self-sufficient in terms of energy. • Hydropower recovery can reduce GHGs emissions and generate carbon credits. - Abstract: The energy efficiency of water supply systems can be increased through the recovery of hydraulic energy implicit to the volumes of water transported in various stages of the supply process, which can be converted into electricity through hydroelectric recovery systems. Such a process allows the use of a clean energy source that is usually neglected in water supplies, reducing its dependence on energy from the local network and the system’s operation costs. This article evaluates the possibilities and benefits of the use of water supply facilities, structures and equipment for hydraulic energy recovery, addressing several applicable hydroelectric models. A real case study was developed in Brazil to illustrate the technical, economic and environmental aspects of hydropower recovery in water supply systems

  12. System Approach of Logistic Costs Optimization Solution in Supply Chain

    OpenAIRE

    Majerčák, Peter; Masárová, Gabriela; Buc, Daniel; Majerčáková, Eva

    2013-01-01

    This paper is focused on the possibility of using the costs simulation in supply chain, which are on relative high level. Our goal is to determine the costs using logistic costs optimization which must necessarily be used in business activities in the supply chain management. The paper emphasizes the need to perform not isolated optimization in the whole supply chain. Our goal is to compare classic approach, when every part tracks its costs isolated, a try to minimize them, with the system (l...

  13. "Actionable" critical success factors for supply chain information system implementations

    NARCIS (Netherlands)

    Denolf, Janne M.; Trienekens, Jacques H.; Nel Wognum, P.M.; Schütz, Verena; Vorst, Van Der Jack G.A.J.; Onno Omta, S.W.F.

    2018-01-01

    Implementing a supply chain information system (SCIS) incurs organizational and technical complexities. For managing these complexities, information system researchers have identified generic critical success factors. However, CSFs are abstract and, therefore, difficult to use in practice. To

  14. Problems of steam turbine diagnostics and the 'Simens' diagnosis system

    International Nuclear Information System (INIS)

    Tserner, V.; Andrea, K.

    1993-01-01

    Diagnostics system, allowing one to detect changes in the state on single turbine elements at an early stage is described. Besides this system allows one to utilize the turbine plant optimally and efficiency from the viewpoint of the equipment durability. Specially oriented monitoring of the turbine plant and equipment element state saves resources necessary to keep up the working order of the equipment

  15. JIT supply chain; an investigation through general system theory

    Directory of Open Access Journals (Sweden)

    O P Mishra

    2013-03-01

    Full Text Available This paper explains theoretical approach of the four theories of General system Theory (GST developed by Yourdon (1989 [Yourdon, E. (1989. Modern Structured Analysis. Yourdon Press, Prentice-Hall International, Englewood Cliffs, New Jersey. Senge] while applying it in information technology and subsequently used by caddy (2007 [Caddy I.N., & Helou, M.M. (2007. Supply chains and their management: Application of general systems theory. Journal of Retailing and Consumer Services, 14, 319–327.] in field of supply chain and management. JIT philosophy in core activities of supply chain i.e. procurement, production processes, and logistics are discussed through general system theory. The growing structure of the supply chain poses the implication restrictions and requires a heavy support system, many times a compromise is done while implementing JIT. The study would be useful to understand the general trends generated naturally regarding the adoption of the JIT philosophy in the supply chain.

  16. Main steam system piping response under safety/relief valve opening events

    International Nuclear Information System (INIS)

    Swain, E.O.; Esswein, G.A.; Hwang, H.L.; Nieh, C.T.

    1980-01-01

    The stresses in the main steam branch pipe of a Boiling Water Reactor due to safety/relief valve blowdown has been measured from an in situ piping system test. The test results were compared with analytical results. The predicted stresses using the current state of art analytical methods used for BWR SRV discharge transient piping response loads were found to be conservative when compared to the measured stress values. 3 refs

  17. Project No. 6 - Replacement of the heating and steam plant

    International Nuclear Information System (INIS)

    2000-01-01

    At present the Ignalina NPP facilities and Visaginas town are supplied with heat and steam from the district heating facility at Ignalina NPP. A back-up system, dating from 1979, supplies heat and steam when the district heating system is under repair or in case of outages of units 1 and 2. The existing back-up system does no longer meet with applicable technical and safety standards. A breakdown of the back-up system might result in the interruption of the supply to Ignalina NPP of heat and steam necessary for a number of processes, including waste management. Reconstruction of the existing boiler houses is not economically viable option, nor recommendable, for safety reasons, as it would mean the temporary closing of the back-up system. Project activities includes the design, construction and commissioning of the proposed facility, including all licensing documentation

  18. Development of technologies on innovative-simplified nuclear power plant using high-efficiency steam injectors (5) operating characteristics of center water jet type supersonic steam injector

    International Nuclear Information System (INIS)

    Abe, Y.; Kawamoto, Y.; Iwaki, C.; Narabayashi, T.; Mori, M.; Ohmori, S.

    2005-01-01

    Next-generation reactor systems have been under development aiming at simplified system and improvement of safety and credibility. A steam injector has a function of a passive pump without large motor or turbo-machinery, and has been investigated as one of the most important component of the next-generation reactor. Its performance as a pump depends on direct contact condensation phenomena between a supersonic steam and a sub-cooled water jet. As previous studies of the steam injector, there are studies about formulation of operating characteristic of steam injector and analysis of jet structure in steam injector by Narabayashi etc. And as previous studies of the direct contact condensation, there is the study about the direct contact condensation in steam atmosphere. However the study about the turbulent heat transfer under the great shear stress is not enough investigated. Therefore it is necessary to examine in detail about the operating characteristic of the steam injector. The present paper reports the observation results of the water jet behavior in the super sonic steam injector by using the video camera and the high-speed video camera. And the measuring results of the temperature and the pressure distribution in the steam injector are reported. From observation results by video camera, it is cleared that the water jet is established at the center of the steam injector right after steam supplied and the operation of the steam injector depends on the throat diameter. And from observation results by high-speed video camera, it is supposed that the columned water jet surface is established in the mixing nozzle and the water jet surface movement exists. And from temperature measuring results, it is supposed that the steam temperature at the mixing nozzle is changed between about 80 degree centigrade and about 60 degree centigrade. Then from the pressure measuring results, it is confirmed that the pressure at the diffuser depends on each the throat diameter and

  19. Emergency systems and protection equipment of modular steam generators for fast reactors

    International Nuclear Information System (INIS)

    Matal, O.

    The requirements are discussed for accident protection of modular steam generators for fast reactors. Accident protection is assessed for a modular through-flow steam generator and for a natural circulation modular steam generator. Benefits and constraints are shown and possible improvements are outlined for accident protection of liquid sodium fired modular steam generators. (Kr)

  20. Stacouf: A new system for automatic processing of eddy current signal from steam generator testing of PWR power plants

    International Nuclear Information System (INIS)

    Ducreux, J.; Eyrolles, P.; Meylogan, T.

    1990-01-01

    A new system called STACOUF will be soon industrialized. The aim is to improve on-site signal processing for eddy testing of steam generators. Testing time, quality and productivity will be improved [fr

  1. Design of teleoperated robot system for nozzle dam maintenance in steam generator

    International Nuclear Information System (INIS)

    Kim, Chang-Hoi; Hwang, Suk-Young; Lee, Young-Gwang; Kim, Byung-Soo; Kim, Seung-Ho; Lee, Jong-Min

    1994-01-01

    The recent development of teleoperated manipulator system in KAERI is presented. The manipulator system is composed of master-slave arm and control system with VME based hierarchical structure. Supervisory control part with graphic workstation provides affluent visual information to human operator. This robot can be operated either in the teleoperation mode with master-slave or in the program mode running by computer system itself to enable installation or removal of nozzle dam appropriately within a water chamber of steam generator. Evaluation and analysis have been carried out to get optimal parameters of the robot. (author)

  2. Knowledge management system for risk mitigation in supply chain uncertainty: case from automotive battery supply chain

    Science.gov (United States)

    Marie, I. A.; Sugiarto, D.; Surjasa, D.; Witonohadi, A.

    2018-01-01

    Automotive battery supply chain include battery manufacturer, sulphuric acid suppliers, polypropylene suppliers, lead suppliers, transportation service providers, warehouses, retailers and even customers. Due to the increasingly dynamic condition of the environment, supply chain actors were required to improve their ability to overcome various uncertainty issues in the environment. This paper aims to describe the process of designing a knowledge management system for risk mitigation in supply chain uncertainty. The design methodology began with the identification of the knowledge needed to solve the problems associated with uncertainty and analysis of system requirements. The design of the knowledge management system was described in the form of a data flow diagram. The results of the study indicated that key knowledge area that needs to be managed were the knowledge to maintain the stability of process in sulphuric acid process and knowledge to overcome the wastes in battery manufacturing process. The system was expected to be a media acquisition, dissemination and storage of knowledge associated with the uncertainty in the battery supply chain and increase the supply chain performance.

  3. Conducting Sanitary Surveys of Water Supply Systems. Student Workbook.

    Science.gov (United States)

    1976

    This workbook is utilized in connection with a 40-hour course on sanitary surveys of water supply systems for biologists, chemists, and engineers with experience as a water supply evaluator. Practical training is provided in each of the 21 self-contained modules. Each module outlines the purpose, objectives and content for that section. The course…

  4. Manipulation robot system based on visual guidance for sealing blocking plate of steam generator

    International Nuclear Information System (INIS)

    Duan Xingguang; Wang Yonggui; Li Meng; Kong Xiangzhan; Liu Qingsong

    2016-01-01

    To reduce labor intensity and irradiation exposure time inside the steam generator during the maintenance period of the nuclear power plant, a blocking plate manipulation robot system, including manipulation robot and pneumatic control console, is developed as an automatic remote-control tool to help staff to complete sealing steam generator primary pipes. The manipulation robot for fastening/loosening bolts utilizes visual guidance for target position, and the recognition algorithm is exerted to extract the bolt center coordinate values from image captured by camera in the procedure. The control strategy based on the position and current feedback is proposed for single bolt operation and whole bolts automatic operation. Meanwhile, the virtual interactive interface and remote monitoring are designed to improve the operability and safety. Finally, the relative experiments have verified the work effectiveness and the future work would be discussed. (author)

  5. Development of an integrated medical supply information system

    Science.gov (United States)

    Xu, Eric; Wermus, Marek; Blythe Bauman, Deborah

    2011-08-01

    The integrated medical supply inventory control system introduced in this study is a hybrid system that is shaped by the nature of medical supply, usage and storage capacity limitations of health care facilities. The system links demand, service provided at the clinic, health care service provider's information, inventory storage data and decision support tools into an integrated information system. ABC analysis method, economic order quantity model, two-bin method and safety stock concept are applied as decision support models to tackle inventory management issues at health care facilities. In the decision support module, each medical item and storage location has been scrutinised to determine the best-fit inventory control policy. The pilot case study demonstrates that the integrated medical supply information system holds several advantages for inventory managers, since it entails benefits of deploying enterprise information systems to manage medical supply and better patient services.

  6. Application of MVPACK to the design of multivariable control systems for a nuclear steam generator

    International Nuclear Information System (INIS)

    Hinds, H.W.

    1986-01-01

    Control systems for most nuclear power plants are designed using conventional single-variable methods which treat each control loop independently. Interactions between loops are accounted for empirically by tuning the controllers to achieve the desired results. As plants increase in size and complexity, and are required to operate closer to maximum capability for greatest economic returns, these dynamic interactions become more important and render the extrapolation of these techniques unreliable. MVPACK is a user-friendly software package that combines a powerful capability to design and analyze complex multivariable control systems, both in state space and transfer function form, with an ease of application. MVPACK is a set of interactive modules that appears to the user as a high-level calculator. It is composed of a database, interaction methods, a mathematical library, and an extensive collection of design algorithms including: order reduction of linear models; pole shifting with output feedback; modal control; optimal control with stochastic state estimation; and the inverse Nyquist array method. The design of multivariable controllers for a nuclear steam generator is discussed. The available outputs of the 15th-order model are steam pressure and water level; control inputs are steam and feedwater flows. Four of the design techniques implemented in the MVPACK module are outlined and then applied to this model

  7. Steam generators, turbines, and condensers. Volume six

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Volume six covers steam generators (How steam is generated, steam generation in a PWR, vertical U-tube steam generators, once-through steam generators, how much steam do steam generators make?), turbines (basic turbine principles, impulse turbines, reaction turbines, turbine stages, turbine arrangements, turbine steam flow, steam admission to turbines, turbine seals and supports, turbine oil system, generators), and condensers (need for condensers, basic condenser principles, condenser arrangements, heat transfer in condensers, air removal from condensers, circulating water system, heat loss to the circulating water system, factors affecting condenser performance, condenser auxiliaries)

  8. Quantifying the Lateral Bracing Provided by Standing Steam Roof Systems

    OpenAIRE

    Sorensen, Taylor J.

    2016-01-01

    One of the major challenges of engineering is finding the proper balance between economical and safe. Currently engineers at Nucor Corporation have ignored the additional lateral bracing provided by standing seam roofing systems to joists because of the lack of methods available to quantify the amount of bracing provided. Based on the results of testing performed herein, this bracing is significant, potentially resulting in excessively conservative designs and unnecessary costs. This proje...

  9. Comparison of centralized and decentralized energy supply systems

    OpenAIRE

    Pfeifer, Thomas; Fahl, Ulrich; Voß, Alfred

    1991-01-01

    Communal energy programs are often embedded in a conception of a decentralized energy supply system where electricity is produced by a number of smaller power plants. For a comprehensive survey the question arises whether these decentralized systems are more advantageous than centralized systems with regard to the criterions energy consumption, safety of supply, environmental compatibility and economy. In the following, after a definition of the term "decentralized", the present structure of ...

  10. Modeling and optimization of a utility system containing multiple extractions steam turbines

    International Nuclear Information System (INIS)

    Luo, Xianglong; Zhang, Bingjian; Chen, Ying; Mo, Songping

    2011-01-01

    Complex turbines with multiple controlled and/or uncontrolled extractions are popularly used in the processing industry and cogeneration plants to provide steam of different levels, electric power, and driving power. To characterize thermodynamic behavior under varying conditions, nonlinear mathematical models are developed based on energy balance, thermodynamic principles, and semi-empirical equations. First, the complex turbine is decomposed into several simple turbines from the controlled extraction stages and modeled in series. THM (The turbine hardware model) developing concept is applied to predict the isentropic efficiency of the decomposed simple turbines. Stodola's formulation is also used to simulate the uncontrolled extraction steam parameters. The thermodynamic properties of steam and water are regressed through linearization or piece-wise linearization. Second, comparison between the simulated results using the proposed model and the data in the working condition diagram provided by the manufacturer is conducted over a wide range of operations. The simulation results yield small deviation from the data in the working condition diagram where the maximum modeling error is 0.87% among the compared seven operation conditions. Last, the optimization model of a utility system containing multiple extraction turbines is established and a detailed case is analyzed. Compared with the conventional operation strategy, a maximum of 5.47% of the total operation cost is saved using the proposed optimization model. -- Highlights: → We develop a complete simulation model for steam turbine with multiple extractions. → We test the simulation model using the performance data of commercial turbines. → The simulation error of electric power generation is no more than 0.87%. → We establish a utility system operational optimization model. → The optimal industrial operation scheme featured with 5.47% of cost saving.

  11. The Complex Economic System of Supply Chain Financing

    Science.gov (United States)

    Zhang, Lili; Yan, Guangle

    Supply Chain Financing (SCF) refers to a series of innovative and complicated financial services based on supply chain. The SCF set-up is a complex system, where the supply chain management and Small and Medium Enterprises (SMEs) financing services interpenetrate systematically. This paper establishes the organization structure of SCF System, and presents two financing models respectively, with or without the participation of the third-party logistic provider (3PL). Using Information Economics and Game Theory, the interrelationship among diverse economic sectors is analyzed, and the economic mechanism of development and existent for SCF system is demonstrated. New thoughts and approaches to solve SMEs financing problem are given.

  12. Business Intelligence tools as an element of information supply system

    Directory of Open Access Journals (Sweden)

    Agnieszka Szmelter

    2013-12-01

    Full Text Available This paper aims to present theBusiness Intelligence toolsas an element improvingflow of information withinthe management information systemand as atool to facilitate theachieving the objectives ofinformation supply system.In the firstpart of the paperthe author presents the issuesrelatedto the specific character of information as a kind of resource and functioning ofthe information supply systemin the enterprise. The secondpart of the articleincludethe characteristics ofBusiness Intelligence systems. The thirdpart deals withthe impact ofBusiness Intelligence toolsto the ongoingactivities ofinformation supply system.

  13. Availability of steam generator against thermal disturbance of hydrogen production system coupled to HTGR

    International Nuclear Information System (INIS)

    Shibata, Taiju; Nishihara, Tetsuo; Hada, Kazuhiko; Shiozawa, Shusaku

    1996-01-01

    One of the safety issues to couple a hydrogen production system to an HTGR is how the reactor coolability can be maintained against anticipated abnormal reduction of heat removal (thermal disturbance) of the hydrogen production system. Since such a thermal disturbance is thought to frequently occur, it is desired against the thermal disturbance to keep reactor coolability by means other than reactor scram. Also, it is thought that the development of a passive cooling system for such a thermal disturbance will be necessary from a public acceptance point of view in a future HTGR-hydrogen production system. We propose a SG as the passive cooling system which can keep the reactor coolability during a thermal disturbance of a hydrogen production system. This paper describes the proposed steam generator (SG) for the HTGR-hydrogen production system and a result of transient thermal-hydraulic analysis of the total system, showing availability of the SG against a thermal disturbance of the hydrogen production system in case of the HTTR-steam reforming hydrogen production system. (author)

  14. A new power supply for superconductive magnetic energy storage system

    International Nuclear Information System (INIS)

    Karady, G.G.; Han, B.M.

    1992-01-01

    In this paper a new power supply for a superconductive magnetic energy storage system, which permits a fast independent regulation of the active and reactive power, is presented. The power supply is built with several units connected in parallel. Each unit consists of a 24-pulse bridge converter, thyristor-switched tap-changing transformer, and thyristor-switched capacitor bank. Its system operation is analyzed by computer simulation and a feasible system realization is shown. A superconductive magnetic energy storage system with the proposed power supply has the capability of leveling the load variation, damping the low-frequency oscillation, and improving the transient stability in the power system. This power supply can be built with commercially available components using well-proven technologies

  15. Modeling sustainability in renewable energy supply chain systems

    Science.gov (United States)

    Xie, Fei

    This dissertation aims at modeling sustainability of renewable fuel supply chain systems against emerging challenges. In particular, the dissertation focuses on the biofuel supply chain system design, and manages to develop advanced modeling framework and corresponding solution methods in tackling challenges in sustaining biofuel supply chain systems. These challenges include: (1) to integrate "environmental thinking" into the long-term biofuel supply chain planning; (2) to adopt multimodal transportation to mitigate seasonality in biofuel supply chain operations; (3) to provide strategies in hedging against uncertainty from conversion technology; and (4) to develop methodologies in long-term sequential planning of the biofuel supply chain under uncertainties. All models are mixed integer programs, which also involves multi-objective programming method and two-stage/multistage stochastic programming methods. In particular for the long-term sequential planning under uncertainties, to reduce the computational challenges due to the exponential expansion of the scenario tree, I also developed efficient ND-Max method which is more efficient than CPLEX and Nested Decomposition method. Through result analysis of four independent studies, it is found that the proposed modeling frameworks can effectively improve the economic performance, enhance environmental benefits and reduce risks due to systems uncertainties for the biofuel supply chain systems.

  16. Urban community perception towards intermittent water supply system.

    Science.gov (United States)

    Joshi, M W; Talkhande, A V; Andey, S P; Kelkar, P S

    2002-04-01

    While evaluating intermittent and continuous water supply systems, consumers opinion survey was undertaken for critical appraisal of both modes of operation. With the help of a pre-designed set of questions relating to various aspects of water supply and the opinion of consumers regarding degree of service, a house to house survey was conducted in the study area of Ghaziabad and Jaipur. The consumer opinion survey clearly indicated a satisfactory degree of service wherever adequate quantity of water was made available irrespective of the mode of water supply. Number of complaints regarding quality of water supplied, timings of supply, low pressures and breakdowns in supply were reported during intermittent water supply. Every family stored water for drinking and other uses. Most of the families discard drinking water once the fresh water supply is resumed next day. Discarded drinking water is usually used in kitchen for washing and gardening. Storage for other purposes depends on economic status and availability of other sources like open dug well in the house. While most of the respondents had no complaints on water tariff, all of them were in favour of continuous water supply.

  17. Design of a partial inter-tube lancing system actuated by hydraulic power for type F model steam generator in nuclear power plant

    International Nuclear Information System (INIS)

    Kim, S. T.; Jeong, W. T.

    2008-01-01

    The sludge grown up in steam generators of nuclear power plants shortens the life-cycle of steam generators and reduces the output of power plants. So KHNP(Korea Hydro and Nuclear Power), the only nuclear power utility in Korea, removes it periodically using a steam generator lancing system during the outage of plants for an overhaul. KEPRI(Korea Electric Power Research Institute) has developed lancing systems with high pressured water nozzle for steam generators of nuclear power plants since 2001. In this paper, the design of a partial inter-tube lancing system for model F type steam generators will be described. The system is actuated without a DC motor inner steam generators because the motors in a steam generator make a trouble from high intensity of radioactivity as a break down

  18. Leak before break evaluation for main steam piping system made of SA106 Gr.C

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Kyoung Mo; Jee, Kye Kwang; Pyo, Chang Ryul; Ra, In Sik [Korea Power Engineering Company, Seoul (Korea, Republic of)

    1997-04-01

    The basis of the leak before break (LBB) concept is to demonstrate that piping will leak significantly before a double ended guillotine break (DEGB) occurs. This is demonstrated by quantifying and evaluating the leak process and prescribing safe shutdown of the plant on the basis of the monitored leak rate. The application of LBB for power plant design has reduced plant cost while improving plant integrity. Several evaluations employing LBB analysis on system piping based on DEGB design have been completed. However, the application of LBB on main steam (MS) piping, which is LBB applicable piping, has not been performed due to several uncertainties associated with occurrence of steam hammer and dynamic strain aging (DSA). The objective of this paper is to demonstrate the applicability of the LBB design concept to main steam lines manufactured with SA106 Gr.C carbon steel. Based on the material properties, including fracture toughness and tensile properties obtained from the comprehensive material tests for base and weld metals, a parametric study was performed as described in this paper. The PICEP code was used to determine leak size crack (LSC) and the FLET code was used to perform the stability assessment of MS piping. The effects of material properties obtained from tests were evaluated to determine the LBB applicability for the MS piping. It can be shown from this parametric study that the MS piping has a high possibility of design using LBB analysis.

  19. Steam Distillation with Induction Heating System: Analysis of Kaffir Lime Oil Compound and Production Yield at Various Temperatures

    International Nuclear Information System (INIS)

    Zuraida Muhammad; Zakiah Mohd Yusoff; Mohd Noor Nasriq Nordin

    2013-01-01

    The steam temperature during the extraction process has a great influence on the essential oil quality. .This study was conducted to analyze the compound of kaffir-lime oil during extracting at different steam temperature using GC-MS analysis. The extraction was carried out by using steam distillation based on induction heating system at different extraction temperature such as 90, 95 and 100 degree Celsius, the power of the induction heating system is fixed at 1.6 kW. Increment of the steam temperature will increase the oil yield. In terms of oil composition, extraction at lower temperature resulted high concentration for four marker compounds of kaffir-lime oil which are α-pinene, sabinene, limonene, β-pinene. (author)

  20. Digital control system of a steam generator water level by LQG optimal method

    International Nuclear Information System (INIS)

    Lee, Yoon Joon

    1993-01-01

    A digital control system for the steam generator water level control is developed using LQG optimal design method. To describe the more realistic situaton, a feedwater valve actuator is assumed to be of the first order lagger and is included in the overall control system. By composing the digital control circuit in such a way that the overall control system consists of two sub-systems of feedwater station and feedback loop digital controller, the design procedure is divided into two independent steps. The feedwater station system is described in the error dynamics of an ordinary regulator system. The optimal gains are obtained by LQ method which imposes the constraints of the feedwater valve motion as well as on the output deviations. Developed also is a Kalman observer on account of the flow measurement uncertainty at low power. Then a digital controller on the feedback loop is designed so that the system maintains the same stability margins for all power ranges. The simulation results show thst the optimal digital system has a good control characteristics despite the adverse dynamics of a steam generator at low power. (Author)

  1. [The development of hospital medical supplies information management system].

    Science.gov (United States)

    Cao, Shaoping; Gu, Hongqing; Zhang, Peng; Wang, Qiang

    2010-05-01

    The information management of medical materials by using high-tech computer, in order to improve the efficiency of the consumption of medical supplies, hospital supplies and develop a new technology way to manage the hospital and material support. Using C # NET, JAVA techniques to develop procedures for the establishment of hospital material management information system, set the various management modules, production of various statistical reports, standard operating procedures. The system is convenient, functional and strong, fluent statistical functions. It can always fully grasp and understand the whole hospital supplies run dynamic information, as a modern and effective tool for hospital materials management.

  2. Integrated energy systems for hydrogen and electricity supply

    Energy Technology Data Exchange (ETDEWEB)

    Muradov, N. [Univ. of Central Florida, Cocoa, FL (United States). Florida Solar Energy Center; Manikowski, A.; Noland, G. [Procyon Power Systems Inc., Alameda, CA (United States)

    2002-07-01

    The United States will soon need an increase in electric generating capacity along with an increase in the distribution capacity of the electricity grid. The cost and time required to build additional electrical distribution and transmission systems can be avoided by using distributed power generation. This paper examines the development of an integrated stand-alone energy system that can produce hydrogen, electricity and heat. The concept is based on integrated operation of a thermocatalytic pyrolysis (TCP) reactor and a solid oxide fuel cell (SOFC). The benefits include high overall energy efficiency, the production of high quality hydrogen (90 to 95 per cent free of carbon oxides), low emissions, and fuel flexibility. Experimental data is presented regarding the thermocatalytic pyrolysis of methane compared with an iron-based catalyst (which is sulfur resistant) and gasification of the resulting carbon with steam and carbon dioxide. With distributed generation, additional electrical generating capacity can be added in small increments distributed over the grid. An integrated energy system will be applicable to any type of hydrocarbon fuel, such as natural gas, liquid propane gas, gasoline, kerosene, jet fuel, diesel fuel and sulfurous residual oils. The suitable range of operating parameters needed to decoke a catalyst bed using steam and carbon dioxide as a degasifying agent was also determined. The Fe-catalyst was efficient in both methane pyrolysis and steam/CO{sub 2} gasification of carbon. It was shown that the TCP and SOFC complement each other in may ways. With the IES, high quality hydrogen is delivered to the end user. IES can also operate as either a hydrogen production unit or as an electrical power generator. The energy efficiency of the IES is estimated at 45-55 per cent. 6 refs., 8 figs.

  3. Energy-Cost Optimisation in Water-Supply System

    OpenAIRE

    Farrukh Mahmood; Haider Ali

    2013-01-01

    Households as well as community water-supply systems for utilisation of underground aquifers are massive consumers of energy. Prevailing energy crisis and focus of the government on demand-side energy policies (i.e., energy conservation) in Pakistan raises need of using energy efficient techniques in almost every aspect of life. This paper analyses performance of community relative to household water-supply system in connection with efficient energy utilisation. Results suggest that total ope...

  4. Dimensioning aspects of 48 V telecommunications power supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Jakab, L. [Siemens Telefongyar Kft (Hungary)

    2000-07-01

    Considering the reliable operation of the 48 V telecommunications power supply systems it is essential the appropriate dimensioning. The basic elements of the power supply systems, i.e. batteries, rectifiers, DC/AC cabling, fuses, etc., should be defined by exact calculation. The presentation reviews the main questions and problems of dimensioning. It lays a special emphasis on the optimized planning procedure, further it also deals with the economical impacts of the dimensioning parameters. (orig.)

  5. Effect of thermal barrier coatings on the performance of steam and water-cooled gas turbine/steam turbine combined cycle system

    Science.gov (United States)

    Nainiger, J. J.

    1978-01-01

    An analytical study was made of the performance of air, steam, and water-cooled gas-turbine/steam turbine combined-cycle systems with and without thermal-barrier coatings. For steam cooling, thermal barrier coatings permit an increase in the turbine inlet temperature from 1205 C (2200 F), resulting in an efficiency improvement of 1.9 percentage points. The maximum specific power improvement with thermal barriers is 32.4 percent, when the turbine inlet temperature is increased from 1425 C (2600 F) to 1675 C (3050 F) and the airfoil temperature is kept the same. For water cooling, the maximum efficiency improvement is 2.2 percentage points at a turbine inlet temperature of 1683 C (3062 F) and the maximum specific power improvement is 36.6 percent by increasing the turbine inlet temperature from 1425 C (2600 F) to 1730 C (3150 F) and keeping the airfoil temperatures the same. These improvements are greater than that obtained with combined cycles using air cooling at a turbine inlet temperature of 1205 C (2200 F). The large temperature differences across the thermal barriers at these high temperatures, however, indicate that thermal stresses may present obstacles to the use of coatings at high turbine inlet temperatures.

  6. Energy Supply System for Industrial Poultry Houses

    Directory of Open Access Journals (Sweden)

    Sit M.L.

    2016-04-01

    Full Text Available The gas engine driven carbon dioxide heat pump designed for providing the heat, cold and electricity for industrial poultry house is proposed. The scheme differs from the known by using recuperative heat exchanger installed between the exhaust air duct of poultry house and heat pump evaporator and the heat curtain installed on the air duct after the evaporator. The air coming into the poultry house after the regenerative heat exchanger is supplied to the heat pump gas cooler. The heat pump produces heat of the required parameters of the input air and water for watering of poultry, space heating, etc. Heat pump compressor is driven by gas engine (GPA, by natural gas or biogas. The part of the gas-piston engine heat is used for adjusting the optimal heat pump mode and for regeneration of the absorbent in an evaporative cooler. The proposed technical solution of the above scheme provides a higher COP of the heat pump. Installing of heat curtain does not require the use of non-freezing solution to prevent icing of the air outlet of heat pump evaporator. The latter allows producing, besides electric power and heat, still cold (with the use off the adsorption-refrigerating machine and provide drying air inlet evaporative cooler (if necessary.

  7. Automatic systems for opening and closing reactor vessels, steam generators, and pressurizers

    International Nuclear Information System (INIS)

    Samblat, C.

    1990-01-01

    The need for shorter working assignments, reduced dose rates and less time consumption have caused Electricite de France and Framatome to automate the entire procedure of opening and closing the main components in the primary system, such as the reactor vessel, steam generator, and pressurizer. The experience accumulated by the two companies in more than 300 annual revisions of nuclear generating units worldwide has been used as a basis for automating all bolt opening and closing steps as well as cleaning processes. The machines and automatic systems currently in operation are the result of extensive studies and practical tests. (orig.) [de

  8. Troubleshooting vacuum systems steam turbine surface condensers and refinery vacuum towers

    CERN Document Server

    Lieberman, Norman P

    2012-01-01

    Vacuum systems are in wide spread use in the petrochemical plants, petroleum refineries and power generation plants. The existing texts on this subject are theoretical in nature and only deal with how the equipment functions when in good mechanical conditions, from the viewpoint of the equipment vendor.  In this much-anticipated volume, one of the most well-respected and prolific process engineers in the world takes on troubleshooting vacuum systems, and especially steam ejectors, an extremely complex and difficult subject that greatly effects the profitability of the majority of the world'

  9. Optimization of heat supply systems employing nuclear power plants

    International Nuclear Information System (INIS)

    Urbanek, J.

    1988-01-01

    Decision making on the further development of heat supply systems requires optimization of the parameters. In particular, meeting the demands of peak load ranges is of importance. The heat supply coefficient α and the annual utilization of peak load equipment τ FS have been chosen as the characteristic quantities to describe them. The heat price at the consumer, C V , offers as the optimization criterion. The transport distance, temperature spread of the heating water, and different curves of annual variation of heat consumption on heat supply coefficient and heat price at the consumer. A comparison between heat supply by nuclear power plants and nuclear heating stations verifies the advantage of combined heat and power generation even with longer heat transport distances as compared with local heat supply by nuclear district heating stations based on the criterion of minimum employment of peak load boilers. (author)

  10. Multiple fuel supply system for an internal combustion engine

    Science.gov (United States)

    Crothers, William T.

    1977-01-01

    A multiple fuel supply or an internal combustion engine wherein phase separation of components is deliberately induced. The resulting separation permits the use of a single fuel tank to supply components of either or both phases to the engine. Specifically, phase separation of a gasoline/methanol blend is induced by the addition of a minor amount of water sufficient to guarantee separation into an upper gasoline phase and a lower methanol/water phase. A single fuel tank holds the two-phase liquid with separate fuel pickups and separate level indicators for each phase. Either gasoline or methanol, or both, can be supplied to the engine as required by predetermined parameters. A fuel supply system for a phase-separated multiple fuel supply contained in a single fuel tank is described.

  11. Automated WWER steam generator eddy current testing and plugging control system

    International Nuclear Information System (INIS)

    Gorecan, I.; Gortan, K.; Grzalja, I.

    2004-01-01

    The structural architecture of the system contains three main components which are described as follows: Manipulator Guidance System; Eddy Current Testing System; Plugging System. The manipulator system has the task to position the end-effectors to the desired tube position. When the final position is reached, the Eddy Current testing system performs data acquisition. In case defects are found, the plugging system performs tube plug installment. Each system is composed of 3 layers. The first layer is the hardware layer consisting of motors driving the effectors along with sensors needed to obtain the positioning data, pusher motors used to push the test probes into tubes of the WWER steam generator, and plugging hardware tool. The second layer is the control box performing basic monitoring and control routines as an interconnection between first and third layer. The highest layer is the control software, running on the PC, which is used as a human-machine-interface.(author)

  12. Engineering Supply Management System: The Next Generation

    Science.gov (United States)

    1991-09-01

    010 Partia! receipts 0018 Automatic inventory update 0 048 Discrepant material 0 004 Order processing requirements Transaction reversal capability 0 012...August 1991. 2-5 sys.em’s modules that support the DEH’s needs are the Sales Order Processing , Register Sales, Purchase Order Processing , Inventory...modular system developed by PIC Business Systems, Incorporated. This system possesses Order Processing , Inventory Management, Purchase Orders, and

  13. power system reliability in supplying nuclear reactors

    International Nuclear Information System (INIS)

    Gad, M.M.M.

    2007-01-01

    this thesis presents a simple technique for deducing minimal cut set (MCS) from the defined minimal path set (MPS) of generic distribution system and this technique have been used to evaluate the basic reliability indices of Egypt's second research reactor (ETRR-2) electrical distribution network. the alternative system configurations are then studied to evaluate their impact on service reliability. the proposed MCS approach considers both sustained and temporary outage. the temporary outage constitutes an important parameter in characterizing the system reliability indices for critical load point in distribution system. it is also consider the power quality impact on the reliability indices

  14. Performance of different types of renewable power supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Al-Motawakel, M K [Sana' a Univ. (Republic of Yemen). Dept. of Physics; Abu-El-Eizz, H M; Awwad, Z [Zagazig Univ. (EG). Dept. of Physics

    1991-10-01

    In this paper we investigate the performance of a hybrid Photovoltaic (PV)-Wind generator power supply system operating under good and fair insolation and wind regimes. The effectiveness of such a hybrid system is measured by the Relative Sizing Parameter (RSP), Money Saving Parameter (MSP), and the Overall Reliability Parameter (ORP). Under specified weather conditions and for a nominal load demand, the RSP relates the product of the PV-modules and storage batteries involved in sizing the PV-Wind hybrid system to those of a stand alone PV-system sized to meet the same load. The MSP reports the difference between the total costs of a stand-alone PV power supply system and a hybrid PV-Wind power supply system, both sized to meet the same load, as a percentage of the total costs involved in supplying the load with a stand-alone PV power supply system only. The ORP compares the yearly average of the daily excess energy (positive difference between generated and consumed energy) of the hybrid system to that of the stand-alone PV power system. Based on this strategy we were able to develop a number of design diagrams which can be used in judging the benefits of utilizing hybrid PW-Wind generators on both economic and energy reliability grounds. (author).

  15. Integral evaluation of energy supply systems at mountain refuges

    Energy Technology Data Exchange (ETDEWEB)

    Aschauer, C. [Univ. of Natural Resources and Applied Life Sciences, Vienna (Austria). Inst. for Chemical and Energy Engineering; Steinbacher, G. [Steinbacher and Steinbacher Civil Engineering Inc. (Austria); Weber, P. [DAV-Deutscher Alpenverein e.V. (Germany). Bundesgeschaeftsstelle; Deubler, Hubert

    2010-07-01

    Most of the mountain refuges scattered over the Alps (more than 1500) are not connected to public infrastructure, requiring decentralized supply and disposal and are therefore called island systems. The increasing number of guests goes along with a higher demand for comport and thus puts pressure on available resources. There are numerous challenges like remoteness, transport, low temperatures, seasonal operation and climate change to be faced. Furthermore, the supply and disposal system of an alpine hut has to merge different interests of the alpine associations, refuge operators, legal authorities and the alpine tourists. Therefore the respective infracstructure has to be managed as an overall-self-contained system. Energy supply is the central issue showing complex interaction with water supply, wastewater treatment and waste disposal. Many problems according to planning, decision-making, construction and operation concerning alpine infrastructure are reported. However detailed information on experiences made in these fields is missing at an international level so far. To correct this lack of data, the German Alpine Association (DAV) initiated the project ''Integral Evaluation of Supply and Disposal Systems of Mountain Refuges, IEVEBS'' in 2006, inviting all stakeholders (Alpine Associations, Legal Authorities, Planners, and Researchers) to participate. Additionally to the final project report which contains a detailed description and evaluation of the supply systems, guidelines will be elaborated in 2010 for planning, implementation and operation, all applicable at an international level. (orig.)

  16. A performance analysis of integrated solid oxide fuel cell and heat recovery steam generator for IGFC system

    DEFF Research Database (Denmark)

    Rudra, Souman; Lee, Jinwook; Rosendahl, Lasse

    2010-01-01

    efficiencies can be achieved. The outputs from SOFC can be utilized by heat recovery steam generator (HRSG), which drives the steam turbine for electricity production. The SOFC stack model was developed using the process flow sheet simulator Aspen Plus, which is of the equilibrium type. Various ranges...... of syngas properties gathered from different literature were used for the simulation. The results indicate a trade-off efficiency and power with respect to a variety of SOFC inputs. The HRSG located after SOFC was included in the current simulation study with various operating parameters. This paper...... describes IGFC power plants, particularly the optimization of HRSG to improve the efficiency of the heat recovery from the SOFC exhaust gas and to maximize the power production in the steam cycle in the IGFC system. HRSG output from different pressure levels varies depending on the SOFC output. The steam...

  17. The imperative for stronger vaccine supply and logistics systems.

    Science.gov (United States)

    Zaffran, Michel; Vandelaer, Jos; Kristensen, Debra; Melgaard, Bjørn; Yadav, Prashant; Antwi-Agyei, K O; Lasher, Heidi

    2013-04-18

    With the introduction of new vaccines, developing countries are facing serious challenges in their vaccine supply and logistics systems. Storage capacity bottlenecks occur at national, regional, and district levels and system inefficiencies threaten vaccine access, availability, and quality. As countries adopt newer and more expensive vaccines and attempt to reach people at different ages and in new settings, their logistics systems must be strengthened and optimized. As a first step, national governments, donors, and international agencies have crafted a global vision for 2020 vaccine supply and logistics systems with detailed plans of action to achieve five priority objectives. Vaccine products and packaging are designed to meet the needs of developing countries. Immunization supply systems support efficient and effective vaccine delivery. The environmental impact of energy, materials, and processes used in immunization systems is minimized. Immunization information systems enable better and more timely decision-making. Competent and motivated personnel are empowered to handle immunization supply chain issues. Over the next decade, vaccine supply and logistics systems in nearly all developing countries will require significant investments of time and resources from global and national partners, donors, and governments. These investments are critical if we are to reach more people with current and newer vaccines. Copyright © 2012 Elsevier Ltd. All rights reserved.

  18. Investigation of thermochemical biorefinery sizing and environmental sustainability impacts for conventional supply system and distributed preprocessing supply system designs

    Energy Technology Data Exchange (ETDEWEB)

    Muth, jr., David J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Langholtz, Matthew H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Tan, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jacobson, Jacob [Idaho National Lab. (INL), Idaho Falls, ID (United States); Schwab, Amy [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wu, May [Argonne National Lab. (ANL), Argonne, IL (United States); Argo, Andrew [Sundrop Fuels, Golden, CO (United States); Brandt, Craig C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cafferty, Kara [Idaho National Lab. (INL), Idaho Falls, ID (United States); Chiu, Yi-Wen [Argonne National Lab. (ANL), Argonne, IL (United States); Dutta, Abhijit [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eaton, Laurence M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Searcy, Erin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-03-31

    The 2011 US Billion-Ton Update estimates that by 2030 there will be enough agricultural and forest resources to sustainably provide at least one billion dry tons of biomass annually, enough to displace approximately 30% of the country's current petroleum consumption. A portion of these resources are inaccessible at current cost targets with conventional feedstock supply systems because of their remoteness or low yields. Reliable analyses and projections of US biofuels production depend on assumptions about the supply system and biorefinery capacity, which, in turn, depend upon economic value, feedstock logistics, and sustainability. A cross-functional team has examined combinations of advances in feedstock supply systems and biorefinery capacities with rigorous design information, improved crop yield and agronomic practices, and improved estimates of sustainable biomass availability. A previous report on biochemical refinery capacity noted that under advanced feedstock logistic supply systems that include depots and pre-processing operations there are cost advantages that support larger biorefineries up to 10 000 DMT/day facilities compared to the smaller 2000 DMT/day facilities. This report focuses on analyzing conventional versus advanced depot biomass supply systems for a thermochemical conversion and refinery sizing based on woody biomass. The results of this analysis demonstrate that the economies of scale enabled by advanced logistics offsets much of the added logistics costs from additional depot processing and transportation, resulting in a small overall increase to the minimum ethanol selling price compared to the conventional logistic supply system. While the overall costs do increase slightly for the advanced logistic supply systems, the ability to mitigate moisture and ash in the system will improve the storage and conversion processes. In addition, being able to draw on feedstocks from further distances will decrease the risk of biomass supply to

  19. Expert systems for space power supply: design, analysis, and evaluation

    International Nuclear Information System (INIS)

    Cooper, R.S.; Thomson, M.K.; Hoshor, A.

    1987-01-01

    The authors evaluated the feasibility of applying expert systems to the conceptual design, analysis, and evaluation of space power supplies in particular, and complex systems in general. To do this, they analyzed the space power supply design process and in associated knowledge base, and characterized them in a form suitable for computer emulation of a human expert. The existing expert system tools and the results achieved with them were evaluated to assess their applicability to power system design. They applied some new concepts for combining program architectures (modular expert systems and algorithms) with information about the domain to create a deep system for handling the complex design problem. They authors developed, programmed and tested NOVICE, a code to solve a simplified version of a scoping study of a wide variety of power supply types for a broad range of missions, as a concrete feasibility demonstration

  20. Using Soft Systems Methodology to Address Supply Chain Management Problems

    Directory of Open Access Journals (Sweden)

    Gulender Gencoglu

    2002-05-01

    Full Text Available This paper reports an investigation of if, and how, Soft Systems Methodology (SSM might.be used to facilitate better management of industry supply chains. In two workshops involving supply chain managers from the Textile Clothing and Footwear (TCF industry and industry facilitators, ways in which SSM techniques might supplement existing Supply Chain Management (SCM workshop approaches have been explored. Specifically, the placement of SSM techniques within a workshop setting, reactions to the techniques, perceived reasons for using SSM, together with strengths and difficulties encountered, have been examined.

  1. An Optimal Method for Developing Global Supply Chain Management System

    Directory of Open Access Journals (Sweden)

    Hao-Chun Lu

    2013-01-01

    Full Text Available Owing to the transparency in supply chains, enhancing competitiveness of industries becomes a vital factor. Therefore, many developing countries look for a possible method to save costs. In this point of view, this study deals with the complicated liberalization policies in the global supply chain management system and proposes a mathematical model via the flow-control constraints, which are utilized to cope with the bonded warehouses for obtaining maximal profits. Numerical experiments illustrate that the proposed model can be effectively solved to obtain the optimal profits in the global supply chain environment.

  2. Accelerator-control-system interface for intelligent power supplies

    International Nuclear Information System (INIS)

    Cohen, S.

    1992-01-01

    A number of high-current high-precision magnet power supplies have been installed at the proton storage ring at the Los Alamos National Laboratory Accelerator Complex. The units replace existing supplies, powering large dipole magnets in the ring. These bending magnets require a high-current supply that is precise and stable. The control and interface design for these power supplies represents a departure from all others on-site. The supplies have sophisticated microprocessor control on-board and communicate with the accelerator control system via RS-422 (serial communications). The units, built by Alpha Scientific Electronics, Hayward, CA use a high-level ASCII control protocol. The low-level ''front-end'' software used by the accelerator control system has been written to accommodate these new devices. They communicate with the control system through a terminal server port connected to the site-wide ethernet backbone. Details of the software implementation for the analog and digital control of the supplies through the accelerator control system will be presented

  3. Algal Supply System Design - Harmonized Version

    Energy Technology Data Exchange (ETDEWEB)

    Jared Abodeely; Daniel Stevens; Allison Ray; Debor

    2013-03-01

    The objective of this design report is to provide an assessment of current technologies used for production, dewatering, and converting microalgae cultivated in open-pond systems to biofuel. The original draft design was created in 2011 and has subsequently been brought into agreement with the DOE harmonized model. The design report extends beyond this harmonized model to discuss some of the challenges with assessing algal production systems, including the ability to (1) quickly assess alternative algal production system designs, (2) assess spatial and temporal variability, and (3) perform large-scale assessments considering multiple scenarios for thousands of potential sites. The Algae Logistics Model (ALM) was developed to address each of these limitations of current modeling efforts to enable assessment of the economic feasibility of algal production systems across the United States. The (ALM) enables (1) dynamic assessments using spatiotemporal conditions, (2) exploration of algal production system design configurations, (3) investigation of algal production system operating assumptions, and (4) trade-off assessments with technology decisions and operating assumptions. The report discusses results from the ALM, which is used to assess the baseline design determined by harmonization efforts between U.S. DOE national laboratories. Productivity and resource assessment data is provided by coupling the ALM with the Biomass Assessment Tool developed at PNNL. This high-fidelity data is dynamically passed to the ALM and used to help better understand the impacts of spatial and temporal constraints on algal production systems by providing a cost for producing extracted algal lipids annually for each potential site.

  4. Effects of rainwater harvesting on centralized urban water supply systems

    DEFF Research Database (Denmark)

    Grandet, C.; Binning, Philip John; Mikkelsen, Peter Steen

    2010-01-01

    depths but very different temporal distributions. Supply reliability and the extent of reliance on the public distribution system are identified as suitable performance indicators for mains water infrastructure. A uniform temporal distribution of rainfall in an oceanic climate like that of Dinard......, Northern France, yielded supply reliabilities close to 100% for reasonable tank sizes (0.065 m3/m2 of roof area in Dinard compared with 0.262 m3/m2 in Nice with a RWSO of 30% for a detached house). However, the collection and use of rainfall results in a permanent decrease in mains water demand leading...... to an increase in water age in the distribution network. Investigations carried on a real network showed that water age is greatly affected when rainwater supplies more than 30% of the overall water demand. In urban water utilities planning, rainwater supply systems may however be profitable for the community...

  5. Ice drilling for blasting boreholes in deep seismic surveys (JARE-43 by steam type drilling system

    Directory of Open Access Journals (Sweden)

    Atsushi Watanabe

    2003-03-01

    Full Text Available A seismic exploration was accomplished in the austral summer of 2001-2002 by the 43rd Japanese Antarctic Research Expedition (JARE-43 along a profile oblique to that held by JARE-41 on the Mizuho Plateau, East Antarctica. We used a steam type drilling system to obtain seven blasting boreholes. We spent 7 to 8 hours to make an enough depth of the hole for one shot point. The holes were 35 to 40 cm in diameter and 23.5 to 28.7 m in depth. The average drilling speed was 3.25 m/hr.

  6. Power supply control system for experimental physical facilities

    International Nuclear Information System (INIS)

    Zelepukin, S.A.; Osipov, Eh.V.; Petrov, V.S.; Sergeev, V.A.; Uglekov, V.Ya.

    1979-01-01

    A multichannel (to 1024 channels) system for control of power supply voltage is descrited. The system consists of an analog commulator, a digital voltmeter and a special controller. The controller serves at the same time as an interface for connecting the system as a ''unit'' of the VECTOR and SUMMA unified electronic systems. The system has been realized for control of the photomultiplier power supply voltage of the MARK multipurpose experimental device (256 channels, the measurement accuracy is 0.2%, the measuring time is 500 ms per point). Software devised for the HP-2100 computer permits automatical comparison of photomultiplier power supply voltages with sample ones in the mode of continuous control of a single voltage or in the mode of programmed selection of voltages to provide the control in arbitrary order or automatic scanning

  7. Multifrequency eddy-current system for inspection of steam generator turbine

    International Nuclear Information System (INIS)

    Davis, T.J.

    1980-11-01

    The objectives of this program were to: determine the maximum advantage of the multifrequency eddy current method for nuclear steam generator tubing inspection; simplify system operating procedures and enhance presentation of mutifrequency data; and evaluate multifrequency methods for inspecting recently encountered types of anomalies such as circumferential cracks, inside diameter flaws, and flaws in dented regions. New test methods developed under the program have resulted in a dramatic improvement over earlier multifrequency work. The methods rely on judicious selection of test frequencies and the simultaneous use of differential and absolute multiparameter inspection. Flaws may be sized and profiled with increased accuracy over that of the single-frequency method, and improved rejection of indications from unwanted parameters such as support plates and probe wobble has been obtained. The ability to detect and size support cracks in both corroded and non-corroded supports has been demonstrated on a laboratory basis. A field-usable test system employing four test frequencies was developed under the program and has been evaluated in the EPRI steam generator mockup. Some of the new technology used in this system has been commercialized into the new Zetec MIZ-12 multifrequency system

  8. Development of technologies on innovative-simplified nuclear power plant using high-efficiency steam injectors. (6) Operating characteristics of center water jet type supersonic steam injector

    International Nuclear Information System (INIS)

    Kawamoto, Yujiro; Abe, Yutaka; Iwaki, Chikako; Narabayashi, Tadashi; Mori, Michitsugu; Ohmori, Shuichi

    2004-01-01

    One of the most interesting devices for next generation reactor systems aiming at simplified system and improvement of safety and credibility is the steam injector which is a passive pump without large motor or turbo-machinery. One of the applications of the steam injector is the passive water injection system to inject the coolant water into the core. The system can be started up merely by injecting the steam without any outer power supply. Since the steam injector is a simple, compact and passive device for water injection, if the steam injector is applied to the actual reactor, it is expected to make the system simple and to reduce the construction cost. Although non-condensable gases are well known for reducing heat transfer between water and steam, the effect of the non-condensable gas on the condensation of supersonic steam on high-speed water jet has not been cleared. The present paper reports about the experimental apparatus, measurement instrument and experimental results of observing the phenomenon inside the test section supplying water and steam to the test by using both the high-speed camera and the video camera and measuring the temperature and the pressure distribution n the test section. (author)

  9. Numerical study on oil supply system of a rotary compressor

    International Nuclear Information System (INIS)

    Wu, Jianhua; Wang, Gang

    2013-01-01

    The oil supply system is a crucial reliability issue for rotary compressors. This paper provides a general method for analyzing the oil supply system of a rotary compressor by using computational fluid dynamics (CFD). The process includes establishing the physical model, dividing computational grid, setting boundary conditions, calculating leakage rates through the roller end clearances, translating the dynamic issue into the static issue and so on. Validation of the rationality of the oil supply system model has been made by the measurement of the main bearing oil flow rates. The effects of operating conditions of the compressor, the oil level height of the oil sump and the main design parameters of the oil supply system on the oil supply characteristics are analyzed by numerical simulation. It is found that the main bearing oil flow rate varies circularly along with the rotation of the shaft. The shape and inclination angle of the spiral groove also influence the main bearing oil flow rate. The oil leakage rates through the roller end clearances depend largely on the operating conditions. In addition, the oil level height of the oil sump has a huge effect on the total oil flow rate. -- Highlights: • A CFD method for analyzing the oil supply system of rotary compressor is presented. • Leakage through the roller end clearances depends on the operating condition. • Groove shape and inclination angle are the main design parameters of spiral grooves. • A parabolic interface of oil and gas can be formed in the gallery of the shaft. • Single-flow model and steady solver can be applied to the oil supply system

  10. Concept of passive safe small reactor for distributed energy supply system

    International Nuclear Information System (INIS)

    Ishida, Toshihisa; Nakajima, Nobuya; Sawada, Ken-ichi; Yoritsune, Tsutomu; Shimada, Shoichiro; Nakano, Yoshihiro; Yonomoto, Taisuke; Takahashi, Hiroki

    2003-01-01

    This paper presents a concept of a Passive Safe Small Reactor for Distributed energy supply system (PSRD). The PSRD is an integrated-type PWR with reactor thermal power of 100 to 300 MW aimed at supplying electricity, district heating, etc. In design of the PSRD, high priority is laid on enhancement of safety as well as improvement of economy. Safety is enhanced by the following means: i) Extreme reduction of pipes penetrating the reactor vessel, by limiting to only those of the steam, the feed water and the safety valves, ii) Adoption of the water filled containment and the passive safety systems with fluid driven by natural circulation force, and iii) Adoption of the in-vessel type control rod drive mechanism, accompanying a passive reactor shut-down. To comply with a severe operation condition of PSRD, material of the ball bearing with graphite retainer has been selected by test. For improvement of economy, simplification of the reactor system and long operation of the core are achieved. Optimization of core design concerning the burnable poison ensures the burn-up of 28 GWd/t for low enriched UO 2 fuel rods. (author)

  11. Passive safe small reactor for distributed energy supply system sited in water filled pit at seaside

    International Nuclear Information System (INIS)

    Ishida, Toshihisa; Imayoshi, Shou

    2003-01-01

    Japan Atomic Energy Research Institute has developed a Passive Safe Small Reactor for Distributed Energy Supply System (PSRD) concept. The PSRD is an integrated-type PWR with reactor thermal power of 100 to 300 MW aimed at supplying electricity, district heating, etc. In design of the PSRD, high priority is laid on enhancement of safety as well as improvement of economy. Safety is enhanced by the following means: i) Extreme reduction of pipes penetrating the reactor vessel, by limiting to only those of the steam, the feed water and the safety valves, ii) Adoption of the water filled containment and the passive safety systems with fluid driven by natural circulation force, and iii) Adoption of the in-vessel type control rod drive mechanism, accompanying a passive reactor shut-down device. For improvement of economy, simplification of the reactor system and long operation of the core over five years without refueling with low enriched UO 2 fuel rods are achieved. To avoid releasing the radioactive materials to the circumstance even if a hypothetical accident, the containment is submerged in a pit filled with seawater at a seaside. Refueling or maintenance of the reactor can be conducted using an exclusive barge instead of the reactor building. (author)

  12. High voltage power supplies for INDUS-2 RF system

    International Nuclear Information System (INIS)

    Badapanda, M.K.; Hannurkar, P.R.

    2003-01-01

    The RF system of Indus-2 employs klystron amplifiers operating at 505.812 MHz. A precession controlled high voltage DC supply of appropriate rating is needed for each klystron amplifier, as its bias supply. Since internal flashover and arcing are common with the operation of these klystrons and stored energies beyond particular limit inside its bias power supply is detrimental to this device, a properly designed crowbar is incorporated between each klystron and its power supply. This crowbar bypass these stored energies and helps protecting klystron under any of these unfavorable conditions. In either case, power supply sees a near short circuit across its load. So, its power circuit is designed to reduce the fault current level and its various components are also designed to withstand these fault currents, as and when it appears. Finally, operation of these high voltage power supplies (HVPS) generates lot of harmonics on the source side, which distort the input waveform substantially and reduces the input power factor also. Source multiplication between two power supplies are planned to improve upon above parameters and suitable detuned line filters are incorporated to keep the input voltage total harmonics distortion (THD) below 5 % and input power factor (IFF) near unity. (author)

  13. EPRI steam generator programs

    International Nuclear Information System (INIS)

    Martel, L.J.; Passell, T.O.; Bryant, P.E.C.; Rentler, R.M.

    1977-01-01

    The paper describes the current overall EPRI steam generator program plan and some of the ongoing projects. Because of the recent occurrence of a corrosion phenomenon called ''denting,'' which has affected a number of operating utilities, an expanded program plan is being developed which addresses the broad and urgent needs required to achieve improved steam generator reliability. The goal of improved steam generator reliability will require advances in various technologies and also a management philosophy that encourages conscientious efforts to apply the improved technologies to the design, procurement, and operation of plant systems and components that affect the full life reliability of steam generators

  14. Water jet behavior in center water jet type supersonic steam injector

    International Nuclear Information System (INIS)

    Kawamoto, Y.; Abe, Y.

    2005-01-01

    Next-generation reactor systems have been under development aiming at simplified system and improvement of safety and credibility. A steam injector has a function of a passive pump without large motor or turbo-machinery, and has been investigated as one of the most important component of the next-generation reactor. Its performance as a pump depends on direct contact condensation phenomena between a supersonic steam and a sub-cooled water jet. As previous studies of the steam injector, there are studies about formulation of operating characteristic of steam injector and analysis of jet structure in steam injector by Narabayashi etc. And as previous studies of the direct contact condensation, there is the study about the direct contact condensation in steam atmosphere. However the study about the turbulent heat transfer under the great shear stress is not enough investigated. Therefore it is necessary to examine in detail about the operating characteristic of the steam injector. The present paper reports the observation results of the water jet behavior in the super sonic steam injector by using the video camera and the high-speed video camera. And the measuring results of the temperature and the pressure distribution in the steam injector are reported. From observation results by video camera, it is cleared that the water jet is established at the center of the steam injector right after steam supplied and the operation of the steam injector depends on the throat diameter. And from observation results by high-speed video camera, it is supposed that the columned water jet surface is established in the mixing nozzle and the water jet surface movement exists. Furthermore and effect of the non-condensable gas on the steam injector is investigated by measuring the radial temperature distributions in the water jet. From measuring results, it is supposed the more the air included in the steam, the more the temperature fluctuation of both steam and discharge water

  15. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  16. A demonstration experiment of steam-driven, high-pressure melt ejection

    International Nuclear Information System (INIS)

    Allen, M.D.; Pitch, M.; Nichols, R.T.

    1990-08-01

    A steam blowdown test was performed at the Surtsey Direct Heating Test Facility to test the steam supply system and burst diaphragm arrangement that will be used in subsequent Surtsey Direct Containment Heating (DCH) experiments. Following successful completion of the steam blowdown test, the HIPS-10S (High-Pressure Melt Streaming) experiment was conducted to demonstrate that the technology to perform steam-driven, high-pressure melt ejection (HPME) experiments has been successfully developed. In addition, the HIPS-10S experiment was used to assess techniques and instrumentation design to create the proper timing of events in HPME experiments. This document discusses the results of this test

  17. Manpower development for safe operation of nuclear power plant. China. Main steam bypass system operation and maintenance. Task: 6.1.6. Technical report

    International Nuclear Information System (INIS)

    Stubley, P.H.

    1994-01-01

    This mission concentrated on the Steam Bypass system of Qinshan Nuclear Power Plant. The system had experienced spurious opening of the bypass valves, disrupting the steam pressure control and the steam generator level control system. A series of commissioning type tests were defined which should allow the operators to revise the setpoints used in the control of the bypass system, and thus prevent spurious opening while maintaining the desired steam pressure control during power maneuvering. Training also included giving experience from other operating plants on aspects of steam and feedwater systems and components, especially as this experience affected maintenance or gave rise to problems. Steam generated maintenance experience is especially applicable, and a future mission is planned for an expert in this field. In addition other aspects of the Chinese nuclear program was assessed to guide future missions. This included assessment of operating procedures from an availability point of view

  18. Creation of reactor's reliable system of emergency energy supply

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Brovkin, A.Yu.; Petukhov, V.K.; Chekushin, A.I.; Chernyaev, V.P.; Yagotinets, N.A.

    1998-01-01

    System of reliable power supply of the WWR-K reactor complex is described, which completely provides safety operation of reactor equipment in the case of total voltage loss from external power transmission lines as well as under destruction of accumulation batteries by earthquake more than 6 balls. Switching on in operation of diesel-generators and system of constant current supply from accumulator batteries is occurred automatically under cessation of voltage supply from centralized power system. Reliable reactor dampening in case it work on capacity has been ensured. Reactor cooling under its emergency shutdown during both the partial or the total loss of coolant in first counter has been carried out. Under full coolant loss the system of emergency reactor cooling has been switched on in operation

  19. Pipe rupture and steam/water hammer design loads for dynamic analysis of piping systems

    International Nuclear Information System (INIS)

    Strong, B.R. Jr.; Baschiere, R.J.

    1978-01-01

    The design of restraints and protection devices for nuclear Class I and Class II piping systems must consider severe pipe rupture and steam/water hammer loadings. Limited stress margins require that an accurate prediction of these loads be obtained with a minimum of conservatism in the loads. Methods are available currently for such fluid transient load development, but each method is severely restricted as to the complexity and/or the range of fluid state excursions which can be simulated. This paper presents a general technique for generation of pipe rupture and steam/water hammer design loads for dynamic analysis of nuclear piping systems which does not have the limitations of existing methods. Blowdown thrust loadings and unbalanced piping acceleration loads for restraint design of all nuclear piping systems may be found using this method. The technique allows the effects of two-phase distributed friction, liquid flashing and condensation, and the surrounding thermal and mechanical equipment to be modeled. A new form of the fluid momentum equation is presented which incorporates computer generated fluid acceleration histories by inclusion of a geometry integral termed the 'force equivalent area' (FEA). The FEA values permit the coupling of versatile thermal-hydraulic programs to piping dynamics programs. Typical applications of the method to pipe rupture problems are presented and the resultant load histories compared with existing techniques. (Auth.)

  20. Optical Fiber Demodulation System with High Performance for Assessing Fretting Damage of Steam Generator Tubes

    Directory of Open Access Journals (Sweden)

    Peijian Huang

    2018-01-01

    Full Text Available In order to access the fretting damage of the steam generator tube (SGT, a fast fiber Fabry-Perot (F-P non-scanning correlation demodulation system based on a super luminescent light emitting diode (SLED was performed. By demodulating the light signal coming out from the F-P force sensor, the radial collision force between the SGT and the tube support plate (TSP was interrogated. For higher demodulation accuracy, the effects of the center wavelength, bandwidth, and spectrum noise of SLED were discussed in detail. Specially, a piezoelectric ceramic transducer (PZT modulation method was developed to get rid of the interference of mode coupling induced by different types of fiber optics in the demodulation system. The reflectivity of optical wedge and F-P sensor was optimized. Finally, the demodulation system worked well in a 1:1 steam generator test loop and successfully demodulated a force signal of 32 N with a collision time of 2 ms.

  1. Economic impact of latent heat thermal energy storage systems within direct steam generating solar thermal power plants with parabolic troughs

    International Nuclear Information System (INIS)

    Seitz, M.; Johnson, M.; Hübner, S.

    2017-01-01

    Highlights: • Integration of a latent heat thermal energy storage system into a solar direct steam generation power cycle. • Parametric study of solar field and storage size for determination of the optimal layout. • Evaluation of storage impact on the economic performance of the solar thermal power plant. • Economic comparison of new direct steam generation plant layout with state-of-the-art oil plant layout. - Abstract: One possible way to further reduce levelized costs of electricity of concentrated solar thermal energy is to directly use water/steam as the primary heat transfer fluid within a concentrated collector field. This so-called direct steam generation offers the opportunity of higher operating temperatures and better exergy efficiency. A technical challenge of the direct steam generation technology compared to oil-driven power cycles is a competitive storage technology for heat transfer fluids with a phase change. Latent heat thermal energy storages are suitable for storing heat at a constant temperature and can be used for direct steam generation power plants. The calculation of the economic impact of an economically optimized thermal energy storage system, based on a latent heat thermal energy storage system with phase change material, is the main focus of the presented work. To reach that goal, a thermal energy storage system for a direct steam generation power plant with parabolic troughs in the solar field was thermally designed to determine the boundary conditions. This paper discusses the economic impact of the designed thermal energy storage system based on the levelized costs of electricity results, provided via a wide parametric study. A state-of-the-art power cycle with a primary and a secondary heat transfer fluid and a two-tank thermal energy storage is used as a benchmark technology for electricity generation with solar thermal energy. The benchmark and direct steam generation systems are compared to each other, based respectively

  2. System design of toroidal field power supply of CDD tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Zheng Zhi

    1996-12-01

    This report deals with system design of Toroidal Field Power Supply of CDD tokamak (CDD-TFPS). The general design philosophy and design variations are introduced. After the outline of CDD-TFPS, the short-circuit calculation, the evaluation of converter parameters, the compatibility of converter and line are carried out. the specifications of major components, semi-conductor devices and accessories are given. High attention is paid to protection system. The design of sub-control and grounding system are described too. Some more general material for power supply design are attached in appendices for reference. (author). 30 tabs., 21 figs.

  3. Fill Rates of Single-Stage and Multistage Supply Systems

    OpenAIRE

    Matthew J. Sobel

    2004-01-01

    A supply system's fill rate is the fraction of demand that is met from on-hand inventory. This paper presents formulas for the fill rate of periodic review supply systems that use base-stock-level policies. The first part of the paper contains fill-rate formulas for a single-stage system and general distributions of demand. When demand is normally distributed, an exact expression uses only the standard normal distribution and density functions, and a good approximation uses only the standard ...

  4. System design of toroidal field power supply of CDD tokamak

    International Nuclear Information System (INIS)

    Liu, Zheng Zhi.

    1996-12-01

    This report deals with system design of Toroidal Field Power Supply of CDD tokamak (CDD-TFPS). The general design philosophy and design variations are introduced. After the outline of CDD-TFPS, the short-circuit calculation, the evaluation of converter parameters, the compatibility of converter and line are carried out. the specifications of major components, semi-conductor devices and accessories are given. High attention is paid to protection system. The design of sub-control and grounding system are described too. Some more general material for power supply design are attached in appendices for reference. (author). 30 tabs., 21 figs

  5. Leaks in the internal water supply piping systems

    OpenAIRE

    Orlov Evgeniy Vladimirovich; Komarov Anatoliy Sergeevich; Mel’nikov Fedor Alekseevich; Serov Aleksandr Evgen’evich

    2015-01-01

    Great water losses in the internal plumbing of a building lead to the waste of money for a fence, purification and supply of water volumes in excess. This does not support the concept of water conservation and resource saving lying today in the basis of any building’s construction having plumbing. Leakage means unplanned of water losses systems in domestic water supply systems (hot or cold) as a result of impaired integrity, complicating the operation of a system and leading to high costs of ...

  6. Design of the steam generator in an energy conversion system based on the aluminum combustion with water

    International Nuclear Information System (INIS)

    Mercati, Stefano; Milani, Massimo; Montorsi, Luca; Paltrinieri, Fabrizio

    2012-01-01

    Highlights: ► Development of a numerical approach for the analysis of a co-generation system based on the aluminum water reaction. ► Construction of system operating maps for estimating the system behavior. ► Comparison of two different designs of the steam generator for the system. ► Definition of the operating range where each configuration provides the best performance. -- Abstract: The paper shows the preliminary design of the superheated steam generator to be used in a novel hydrogen production and energy conversion system based on the combustion of aluminum particles with water. The system is aimed at producing hydrogen and pressurized superheated steam, using the heat released by the Al–H 2 O reaction. The interest on this type of technology arises because of the possibility of obtaining hydrogen with very low pollutant and greenhouse gas emissions, compared to the traditional hydrogen production systems, such as the steam reforming from methane. The analysis of the combustion chamber and the heat recovery system is carried out by means of a lumped and distributed parameter numerical approach. The multi phase and gas mixture theoretical principles are used both to characterize the mass flow rate and the heat release in the combustion chamber and within the heat exchangers in order to relate the steam generator performance to the system operating parameters. Finally, the influence of the steam generator performance on the whole energy conversion system behavior is addressed, with particular care to the evaluation of the total power and efficiency variation with the combustion parameters.

  7. Optimal sampling period of the digital control system for the nuclear power plant steam generator water level control

    International Nuclear Information System (INIS)

    Hur, Woo Sung; Seong, Poong Hyun

    1995-01-01

    A great effort has been made to improve the nuclear plant control system by use of digital technologies and a long term schedule for the control system upgrade has been prepared with an aim to implementation in the next generation nuclear plants. In case of digital control system, it is important to decide the sampling period for analysis and design of the system, because the performance and the stability of a digital control system depend on the value of the sampling period of the digital control system. There is, however, currently no systematic method used universally for determining the sampling period of the digital control system. Generally, a traditional way to select the sampling frequency is to use 20 to 30 times the bandwidth of the analog control system which has the same system configuration and parameters as the digital one. In this paper, a new method to select the sampling period is suggested which takes into account of the performance as well as the stability of the digital control system. By use of the Irving's model steam generator, the optimal sampling period of an assumptive digital control system for steam generator level control is estimated and is actually verified in the digital control simulation system for Kori-2 nuclear power plant steam generator level control. Consequently, we conclude the optimal sampling period of the digital control system for Kori-2 nuclear power plant steam generator level control is 1 second for all power ranges. 7 figs., 3 tabs., 8 refs. (Author)

  8. Refurbishment of the power supply and NMR systems

    International Nuclear Information System (INIS)

    Dugay, G.

    1998-01-01

    This paper summarises some of the first renovation performed on GANIL power converters, their control system and on magnetic field measurements. Among numerous actions undertaken the most important four, mentioned in the report are: remote control interfaces; current catchers; pulsed supplies; RMN system renovation

  9. Monitoring water supply systems for anomaly detection and response

    NARCIS (Netherlands)

    Bakker, M.; Lapikas, T.; Tangena, B.H.; Vreeburg, J.H.G.

    2012-01-01

    Water supply systems are vulnerable to damage caused by unintended or intended human actions, or due to aging of the system. In order to minimize the damages and the inconvenience for the customers, a software tool was developed to detect anomalies at an early stage, and to support the responsible

  10. Information system design for demand-driven supply networks

    OpenAIRE

    Selk, Bernhard

    2004-01-01

    Information system design for demand-driven supply networks : integrating CRM & SCM / B. Selk, K. Turowski, C. Winnewisser. - In: EIS : Fourth International ICSC Symposium on Engineering of Intelligent Systems, EIS 2004. [Elektronische Ressource]. - Millet, Alberta : ICSC Interdisciplinary Research Canada, 2004. - 8 S. auf CD-ROM

  11. The changing logistical system of the building materials supply chain

    NARCIS (Netherlands)

    Voordijk, Johannes T.

    2000-01-01

    This study analyses how policy measures and technological developments affect the trade-offs between elements of the logistical system of a supply chain. It is assumed that this logistical system consists of the following elements: sourcing, production, inventory, transportation and service. Two

  12. Intelligent decision support system for operators of the supply ...

    African Journals Online (AJOL)

    Intelligent decision support system for operators of the supply department of oil and gas extracting industry. ... PROMOTING ACCESS TO AFRICAN RESEARCH ... abnormal situations, pre-crash sensing, industrial drilling, decision-making support systems. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  13. Zijm Consortium: Engineering a Sustainable Supply Chain System

    NARCIS (Netherlands)

    Knofius, Nils; Rahimi Ghahroodi, Sajjad; van Capelleveen, Guido Cornelis; Yazdanpanah, Vahid

    2018-01-01

    In this paper we address one of the current major research areas of the Zijm consortium; engineering sustainable supply chain systems by transforming traditionally linear practices to circular systems. We illustrate this field of research with a case consisting of a network of three firms Willem

  14. Steam generator waterlancing at Darlington NGS (system development and field application)

    International Nuclear Information System (INIS)

    Seppala, D.; Malaugh, J.; Kiisel, E.; Kamler, F.

    1996-01-01

    From the initial steam generator (SG) inspections at Darlington Nuclear Generating Station (DNGS), the authors know that the sludge accumulations on the secondary side tubesheets have been minimal. DNGS is a fairly new station but the experience at the older Ontario Hydro plants have shown that significant accumulations will happen. A pro-active strategy has been adopted for maintaining SGs that will minimize corrosion product accumulation and the potential for component degradation. During the four year planned Unit maintenance outages, SGs will be inspected and waterlanced using a waterlance system designed and built by Babcock and Wilcox International. This automated state-of-the-art system also allows fully recorded inspections of the tubesheet/first half-lattice supports. Some of the key elements covered include results of the initial field application (May, 1995), system development and design, system qualification, cleaning performance, and lessons learned for future outages

  15. Development of intelligent Eddy Current Testing (ECT) system for PWR steam generator tube inspection

    International Nuclear Information System (INIS)

    Kawata, K.; Kawase, N.; Kurokawa, M.; Asada, Y.

    2005-01-01

    The intelligent ECT system was developed for the inspection of heat transfer tubes of the steam generator of the PWR plant. It consists of intelligent probe, data acquisition unit and data analysis system. The probe combines 24 channels inclined lay out drive coils and thin film pick-up coils with built-in electric circuits to provide high inspection capability equivalent to rotating coil ECT and high-speed inspection equivalent to conventional bobbin coil ECT. The advanced data analysis system that has filtering and automatic analysis functions is also developed to enable fast and precise analysis of large volume inspection data. The system was qualified by confirmation tests in FY 2003 to show thinned thickness sizing accuracy within ± 5%. (T. Tanaka)

  16. Optimal Control and Optimization of Stochastic Supply Chain Systems

    CERN Document Server

    Song, Dong-Ping

    2013-01-01

    Optimal Control and Optimization of Stochastic Supply Chain Systems examines its subject in the context of the presence of a variety of uncertainties. Numerous examples with intuitive illustrations and tables are provided, to demonstrate the structural characteristics of the optimal control policies in various stochastic supply chains and to show how to make use of these characteristics to construct easy-to-operate sub-optimal policies.                 In Part I, a general introduction to stochastic supply chain systems is provided. Analytical models for various stochastic supply chain systems are formulated and analysed in Part II. In Part III the structural knowledge of the optimal control policies obtained in Part II is utilized to construct easy-to-operate sub-optimal control policies for various stochastic supply chain systems accordingly. Finally, Part IV discusses the optimisation of threshold-type control policies and their robustness. A key feature of the book is its tying together of ...

  17. Steam cleaning device

    International Nuclear Information System (INIS)

    Karaki, Mikio; Muraoka, Shoichi.

    1985-01-01

    Purpose: To clean complicated and long objects to be cleaned having a structure like that of nuclear reactor fuel assembly. Constitution: Steams are blown from the bottom of a fuel assembly and soon condensated initially at the bottom of a vertical water tank due to water filled therein. Then, since water in the tank is warmed nearly to the saturation temperature, purified water is supplied from a injection device below to the injection device above the water tank on every device. In this way, since purified water is sprayed successively from below to above and steams are condensated in each of the places, the entire fuel assembly elongated in the vertical direction can be cleaned completely. Water in the reservoir goes upward like the steam flow and is drained together with the eliminated contaminations through an overflow pipe. After the cleaning has been completed, a main steam valve is closed and the drain valve is opened to drain water. (Kawakami, Y.)

  18. Design and modelling of an innovative three-stage thermal storage system for direct steam generation CSP plants

    Science.gov (United States)

    Garcia, Pierre; Vuillerme, Valéry; Olcese, Marco; El Mourchid, Nadim

    2016-05-01

    Thermal Energy Storage systems (TES) for a Direct Steam Generation (DSG) solar plant feature preferably three stages in series including a latent heat storage module so that steam can be recovered with a limited temperature loss. The storage system designed within the Alsolen Sup project is characterized by an innovative combination of sensible and latent modules. A dynamic model of this three-stage storage has been developed and applied to size the storage system of the Alsolen Sup® plant demonstrator at CEA Cadarache. Results of this simulation show that this promising concept is an efficient way to store heat in DSG solar plants.

  19. Flexibility of Supply Chain in Industrialised Building System (IBS

    Directory of Open Access Journals (Sweden)

    Kassim U.

    2014-01-01

    Full Text Available It is irrefutable that the construction industry is in need of a highly technological construction method or system for the simple aim of giving it a push it deserves. In Malaysia this technologically enhanced method is known as the Indutrialised Building System (IBS. Concerted efforts have been made for the past decade by various responsible parties especially by the government. Therefore, the IBS ‘Road Map’ 2003–2010 was introduced and now continues with the IBS ‘road map’ 2011-2015. However, its performance is still at its infancy, which target is only at an initial stage. This study seeks to identify and analyse the factor of the IBS’ system’s supply chain flexibility as a factor on the success of the system itself. It has been a suspicion that there exists a condition and situation where the supply chain is too rigid and is not flexible in fulfilling the needs and demands of the IBS development in Malaysia. This inflexible situation has brought about a broad range of problems and has stood in the way of the development of the industrialised building system, despite it being introduced since 1964, or 49 years ago. Flexibility in the IBS supply chain is very important and is associated with other industries like transportation, manufacturing industry, and others. Up until now, we have yet to discover any special studies related to the flexibility in the IBS supply chain in this country. Responding to this challenge, this research is hoped to be able to provide sufficient feedback to the solution to the IBS supply chain flexibility issue. The researcher is confident that the poor system flow of supply chain has impeded the advancement of the Industrialised Building System that has long been open to debate.

  20. Smart Power Supply for Battery-Powered Systems

    Science.gov (United States)

    Krasowski, Michael J.; Greer, Lawrence; Prokop, Norman F.; Flatico, Joseph M.

    2010-01-01

    A power supply for battery-powered systems has been designed with an embedded controller that is capable of monitoring and maintaining batteries, charging hardware, while maintaining output power. The power supply is primarily designed for rovers and other remote science and engineering vehicles, but it can be used in any battery alone, or battery and charging source applications. The supply can function autonomously, or can be connected to a host processor through a serial communications link. It can be programmed a priori or on the fly to return current and voltage readings to a host. It has two output power busses: a constant 24-V direct current nominal bus, and a programmable bus for output from approximately 24 up to approximately 50 V. The programmable bus voltage level, and its output power limit, can be changed on the fly as well. The power supply also offers options to reduce the programmable bus to 24 V when the set power limit is reached, limiting output power in the case of a system fault detected in the system. The smart power supply is based on an embedded 8051-type single-chip microcontroller. This choice was made in that a credible progression to flight (radiation hard, high reliability) can be assumed as many 8051 processors or gate arrays capable of accepting 8051-type core presently exist and will continue to do so for some time. To solve the problem of centralized control, this innovation moves an embedded microcontroller to the power supply and assigns it the task of overseeing the operation and charging of the power supply assets. This embedded processor is connected to the application central processor via a serial data link such that the central processor can request updates of various parameters within the supply, such as battery current, bus voltage, remaining power in battery estimations, etc. This supply has a direct connection to the battery bus for common (quiescent) power application. Because components from multiple vendors may have

  1. Moisture separators and reheaters for wet steam turbines

    International Nuclear Information System (INIS)

    Gibbins, J.

    1979-01-01

    Moisture separator reheater (M.S.R.) units are now a well established feature of the wet steam cycle as associated with the various types of water cooled reactor. This paper describes the development of M.S.Rs. as supplied by GEC for turbine generators of up to 1200 MW ratings covering the design procedures used and the features required to ensure efficient and reliable operation. In addition to details of the M.S.R. design, the desirable features of the steam supply, venting and drain control systems are also discussed. The recent developments, as provided on current projects, are described. (author)

  2. Design Optimization of a Low Pressure LNG Fuel Supply System

    OpenAIRE

    Nguyen, Kim

    2015-01-01

    In 2014 there were 50 liquefied natural gas (LNG) fuelled ships in operation and around 70 on order worldwide. LNG proves to emit less pollution and considering the present and future emission regulations and optimistic gas fuel prices, LNG would be a preferable option as a marine fuel. The number of LNG fuelled ships is therefore likely to increase significantly the next five to ten years. There are many ways to configure the fuel supply system. The fuel supply system consists of a tank,...

  3. Protection and switching system for the RFX power supply

    International Nuclear Information System (INIS)

    Browning, J.L.; Gray, J.W.; Mace, T.A.; Varley, G.L.

    1986-01-01

    The RFX toroidal field power supply comprises a large 4.8MJ (max) modular capacitor bank and four 14MW AC/DC converter flat-top power supply modules. The high fault level associated with the capacitor banks presents a problem in the design of the switching system, since mistiming could produce large currents in the flat-top supplies. The poloidal circuit consists of four groups of magnetising windings connected in series, each with its own flat-top convertor supply and opening switch transfer system. The flat-top converter supplies are needed when the transfer voltage has fallen from approximately 40kV to 1kV. Solutions to the problem of designing a fault-tolerant system which presents no danger to the flat-top converters are described in the paper. The adopted methods make use of hybrid ignitron/mechanical switches to give the required combination of switching speed and current carrying capacity, together with careful attention to the circuit layout of different switching elements. (author)

  4. Possibility of revitalization of control system of steam turbine 210 MW LMZ

    International Nuclear Information System (INIS)

    Racki, Branko

    2004-01-01

    It is a one-shaft, three casing condensing turbine, type K-210-130. A rigid coupling connects it directly to the electric energy generator. There is one intermediate superheat of steam and seven non regulated blending for regenerative condensate heating. A considerate number of such turbines have been used on the territory of the Eastern Europe. There are two blocks installed in TP Sisak, Croatia. There is a survey of the existing control system of turbine, power 210 MW. It points out and describes problems appearing during exploitation. Technical solutions according to complexity of realization have been described. It gives an overview of minimum range of modification with utilization of the existing oil system and maximum range by adding separate high pressure oil system with new solutions for performing segments. (Author)

  5. High Temperatures Health Monitoring of the Condensed Water Height in Steam Pipe Systems

    Science.gov (United States)

    Lih, Shyh-Shiuh; Bar-Cohen, Yoseph; Lee, Hyeong Jae; Badescu, Mircea; Bao, Xiaoqi; Sherrit, Stewart; Takano, Nobuyuki; Ostlund, Patrick; Blosiu, Julian

    2013-01-01

    Ultrasonic probes were designed, fabricated and tested for high temperature health monitoring system. The goal of this work was to develop the health monitoring system that can determine the height level of the condensed water through the pipe wall at high temperature up to 250 deg while accounting for the effects of surface perturbation. Among different ultrasonic probe designs, 2.25 MHz probes with air backed configuration provide satisfactory results in terms of sensitivity, receiving reflections from the target through the pipe wall. A series of tests were performed using the air-backed probes under irregular conditions, such as surface perturbation and surface disturbance at elevated temperature, to qualify the developed ultrasonic system. The results demonstrate that the fabricated air-backed probes combined with advanced signal processing techniques offer the capability of health monitoring of steam pipe under various operating conditions.

  6. Design of on-line steam generator leak monitoring system based on Cherenkov counting technique

    International Nuclear Information System (INIS)

    Dileep, B.N.; D'Cruz, S.J.; Biju, P.; Jashi, K.B.; Prabhakaran, V.; Venkataramana, K.; Managanvi, S.S.

    2006-01-01

    The methodology developed by Nuclear Power Corporation of India Ltd. for identification of leaky Steam Generator (SG) by monitoring 134 I activity in the blow down water is a very high sensitive method. However, this technique can not be put into use as an on-line system. A new method of on-line detection of SG leak and identify the offending SG based on Cherenkov counting technique is explained in this paper. It identifies the leak by detecting Cherenkov radiation produced by the hard beta emitting radio nuclides escaped into feed water during leak in an operating reactor. A simulated system shows that a leak rate of 2 kg/h can be detected by the proposed system, while coolant 134 I activity is 3.7 MBq/l (100μCi/l). (author)

  7. Systems and economics for the estimation of uranium potential supply

    International Nuclear Information System (INIS)

    Harris, D.P.; Ortiz-Vertiz, R.; Chavex, M.L.; Agbolosoo, E.K.

    1981-07-01

    This report consists of four parts, each one reasonably complete unto itself: Part I - Potential Supply Systems Based upon the Simulation of Sequential Exploration and Economic Decisions -- Systems Designed for the Analysis of NURE Endowment; Part II - Crustal Abundance and a Potential Supply System; Part III - An Investigation of Productivity and Technical Change in Exploration for and Production of Uranium; and Part IV - The Use of Solute Transport Models to Generate Geochemical Responses from a Hypothetical Uranium Deposit - An Early Effort in the Exploration Model Design. The bulk of this research was devoted to the design of potential supply systems. However, in that such systems require the modeling of exploration and exploitation, both of these activities were investigated as economic phenomena and as the subjects of models. Part I represents the largest of the research efforts. An attempt was made to design a system in which exploration is modeled in terms of both its efficiency and economics. While the exploration model demonstrated in this report is for roll-type sandstone deposits, this potential supply system, as a system per se, also applies to tabular deposits (San Juan Basin). Part II explores the concept of crustal abundance and existing crustal abundance models. The design of this crustal abundance potential supply system differs from that of any previously constructedcrustal abundance models in that it explicitly considers the third dimension, depth to deposit, and it places great emphasis upon the credible representation of the economics of exploration and exploitation. Part III reports on an attempt to measure the magnitude of technical change and depletion on the productivity of exploration and mining. This research examined these issues from the perspective of the economist, not the engineer. Part IV reports on an investigation of the feasibility of modeling the geochemical exploration for uranium, radon, and helium plumes

  8. Coordination in the Decentralized Assembly System with Dual Supply Modes

    Directory of Open Access Journals (Sweden)

    Xu Guan

    2013-01-01

    Full Text Available This paper investigates a decentralized assembly system that consists of one assembler and two independent suppliers; wherein one supplier is perfectly reliable for the production, while the other generates yield uncertainty. Facing the random market demand, the assembler has to order the components from one supplier in advance and meanwhile requires the other supplier to deliver the components under VMI mode. We construct a Nash game between the supplier and the assembler so as to derive their equilibrium procurement/production strategies. The results show that the channel’s performance is highly undermined by the decentralization between players and also the combination of two supply modes. Compared to the centralized system, we propose an advance payment contract to perfectly coordinate the supply chain performance. The numerical examples indicate some management implications on the supply mode comparison and sensitivity analysis.

  9. An automated eddy current in-service inspection system for nuclear steam generator tubing

    International Nuclear Information System (INIS)

    Wells, N.S.

    1981-06-01

    A prototype steam generator in-service inspection system incorporating remotely-controlled instrumentation linked by a digital transmission line to an instrument and control trailer outside the reactor containment has been designed and manufactured and is presently undergoing field tests. The (Monel 400) steam generator tubes are scanned two at a time using absolute eddy current probes controlled by two remotely-operated probe drives at a scanning speed of 0.5 m/s. The probes are positioned on the tubesheet by a light-weight (1.5 kg) microprocessor-operated tubesheet walker mechanism. Digitized control and data signals are transmitted up to 300 m to the control trailer. There the control and analysis computers extract the relevant signal information and present it in condensed form as labelled graphics on CRT consoles for on-line visual assessment. Hard copy output is also provided for each tube scanned (one per minute). Condensed data is archived on magnetic tapes for additional off-line analysis and comparisons with other inspections

  10. Control system of power supply for resistance welding machine

    Directory of Open Access Journals (Sweden)

    Світлана Костянтинівна Поднебенна

    2017-06-01

    Full Text Available This article describes the existing methods of heat energy stabilizing, which are realized in thyristor power supplies for resistance welding machines. The advantages and features of thyristor power supplies have been described. A control system of power supply for resistance welding machine with stabilization of heat energy in a welding spot has been developed. Measurements are performed in primary winding of a welding transformer. Weld spot heating energy is calculated as the difference between the energy, consumed from the mains, and the energy losses in the primary and secondary circuits of the welding transformer as well as the energy losses in the transformer core. Algorithms of digital signal processing of the developed control system are described in the article. All measurements and calculations are preformed automatically in real-time. Input signals to the control system are: transformer primary voltage and current, temperature of the welding circuit. The designed control system ensures control of the welding heat energy and is not influenced by the supply voltage and impedance changes caused by insertion of the ferromagnetic mass in the welding circuit, the temperature change during the welding process. The developed control system for resistance welding machine makes it possible to improve the quality of welded joints, increase the efficiency of the resistance welding machine

  11. The control system of the RFX toroidal power supply

    International Nuclear Information System (INIS)

    Toigo, V.; Piovan, R.; Zanotto, L.; Perna, M.; Coffetti, A.; Freghieri, M.; Povolero, M.

    2005-01-01

    This paper describes the control system of the toroidal power supply of the RFX experiment and outlines its specific hardware and software structure, which allowed to cope with the numerous requirements of the application with a compact hardware arrangement. The active fault protection strategies, implemented in the control system, are also discussed; finally, a special part of the control, which greatly simplified the long and complex commissioning of the power section of the system, is described

  12. Performance analysis of a small regenerative gas turbine system adopting steam injection and side-wall in finned tube evaporator

    International Nuclear Information System (INIS)

    Kang, Soo Young; Lee, Jong Jun; Kim, Tong Seop

    2009-01-01

    Small gas turbines in power range of several MWs are quite suitable for application in distributed generation as well as Community Energy Systems (CES). Humidification is an effective way to improve gas turbine performance, and steam injection is the most general and practically feasible method. This study intended to examine the effect of steam injection on the performance of several MW class gas turbines. A primary concern is given to the regenerative cycle gas turbine. The steam injection effect on the performance of a system without the regenerator (i.e. a simple cycle) is also examined. In addition, the influence of bypass of some of the exhaust gas on the performance of the gas turbine, especially the regenerative cycle gas turbine, is evaluated.

  13. Ultrasonic inspection experience of steam generator tubes at Ontario Hydro and the TRUSTIE inspection system

    International Nuclear Information System (INIS)

    Choi, E.I.; Jansen, D.

    1998-01-01

    Ontario Hydro have been using ultrasonic test (UT) technique to inspect steam generator (SG) tubes since 1993. The UT technique has higher sensitivity in detecting flaws in SG tubes and can characterize the flaws with higher accuracy. Although an outside contractor was used initially, Ontario Hydro has been using a self-developed system since 1995. The TRUSTIE system (Tiny Rotating UltraSonic Tube Inspection Equipment) was developed by Ontario Hydro Technologies specifically for 12.7 mm outside diameter (OD) tubes, and later expanded to larger tubes. To date TRUSTIE has been used in all of Ontario Hydro's nuclear generating stations inspecting for flaws such as pitting, denting, and cracks at top-of-tubesheet to the U-bend region. (author)

  14. Development of the visual inspection system for the top of the tube sheet in steam generators

    International Nuclear Information System (INIS)

    Kim, Gyung Sub; Choi, Sang Hoon; Kim, Ki Chul

    2008-01-01

    Steam Generators at Nuclear Power plants have a important function to isolate Radioactivity between the primary side radioactive fluid running through tubes and the secondary side with non-radioactive fluid through out of a tube bundle, in addition to a function of steam generation. Therefore, To obtain integrity of Steam Generator is really important for safety in the nuclear power plant. At the same time, sludge and foreign objects in steam generators are known as major sources causing the damage of SG tubes. But there is no way to prevent those coming to steam generators until now. Therefore, a periodic inspection and removal of those in steam generators is the only way for those Generally, Most of the Nuclear Power Plants have been inspecting visually every outage for the top of the tube sheet in which sludge and foreign objects lead to the buildup to know how these are

  15. Alternative energy supply system to a rural village in Ethiopia

    NARCIS (Netherlands)

    Tucho, Gudina; Nonhebel, Sanderine

    2017-01-01

    Background Most households in rural developing countries do not have access to modern energy supply. Household level biogas energy was considered as an option but failed due to lack of sufficient resources for its installation and operation. A community energy system can be an option, but most

  16. The effect of information systems on supply chain and performance ...

    African Journals Online (AJOL)

    The effect of information systems on supply chain and performance of National Iranian South Oil Company (NISOC) ... Sample population of this research is made up of nisoc's managers and experts that are more than 2043 persons.By applying the cochrane's formula,the sample population of this research determined as ...

  17. Advanced control of a water supply system : A case study

    NARCIS (Netherlands)

    Bakker, M.; Rajewicz, T.; Kien, H.; Vreeburg, J.H.G.; Rietveld, L.C.

    2014-01-01

    Conventional automatic production flow control and pump pressure control of water supply systems are robust and simple: production flow is controlled based on the level in the clear water reservoir and pump pressure is controlled on a static set-point. Recently, more advanced computer-based control

  18. Effect of Climate Change on the Food Supply System: Implications ...

    African Journals Online (AJOL)

    Climate change has become an issue of great concern in recent years due to its effect on every aspect of life. The ecosystem, agriculture, industry, households and human well-being are all intertwined with climate change issues. The food supply system worldwide has been affected and is also contributing to climate ...

  19. Securing innovation through a differentiated supply system : The fashion industry

    NARCIS (Netherlands)

    Kamann, Dirk-Jan F.; Steller, Daan; Kaminishi, K; Duysters, G

    2007-01-01

    This paper describes a Situation where next to very innovative goods with short life cycles and volatile demand, rather commodity type goods are carried with more stable demand. A 'Two Lane Strategy' is described, with two different configurations of actors in the company's supply system. In each of

  20. Collaborative Learning in Advanced Supply Systems: The KLASS Pilot Project.

    Science.gov (United States)

    Rhodes, Ed; Carter, Ruth

    2003-01-01

    The Knowledge and Learning in Advanced Supply Systems (KLASS) project developed collaborative learning networks of suppliers in the British automotive and aerospace industries. Methods included face-to-face and distance learning, work toward National Vocational Qualifications, and diagnostic workshops for senior managers on improving quality,…

  1. Sources Of Incidental Events In Collective Water Supply System

    Directory of Open Access Journals (Sweden)

    Szpak Dawid

    2015-11-01

    Full Text Available The publication presents the main types of incidental events in collective water supply system. The special attention was addressed to the incidental events associated with a decrease in water quality, posing a threat to the health and life of inhabitants. The security method against incidental contamination in the water source was described.

  2. Design of Intelligent Power Supply System for Expressway Tunnel

    Science.gov (United States)

    Wang, Li; Li, Yutong; Lin, Zimian

    2018-01-01

    Tunnel lighting program is one of the key points of tunnel infrastructure construction. As tunnels tend to handle remote locations, power supply line construction generally has been having the distance, investment, high cost characteristics. To solve this problem, we propose a green, environmentally friendly, energy-efficient lighting system. This program uses the piston-wind which cars within tunnel produce as the power and combines with solar energy, physical lighting to achieve it, which solves the problem of difficult and high cost of highway tunnel section, and provides new ideas for the future construction of tunnel power supply.

  3. Multipurpose expert-robot system model for control, diagnosis, maintenance, and repairs at the steam generators of the NPP

    International Nuclear Information System (INIS)

    Popa, I.

    1994-01-01

    The paper presents the model concept for a multipurpose expert-robot system for control, diagnosis, forecast, maintenance, and repairs at the steam generators of CANDU type nuclear power plants. The system has two separate parts: the expert system and the robot (manipulator) system. These parts compose a hierarchic structure with the expert system on the upper level. The expert system has a blackboard architecture, to which tree interfaces with the robot system, with the control system of the NPP and with the methods and techniques of control, maintenance and repairs system of the steam generator are added. Due to complex nature of its activities the expert-robot system model combines the deterministic type reasons with probabilistic, fuzzy, and neural-networks type ones. The information that enter the expert system comes from the robot system, from process, from user, and human expert. The information that enter robot system comes from the expert system, from the human operator (when connected) and from process. Control maintenance and repair operations take place by means of the robot system that can be monitored either directly by the expert system or by the human operator who follows its activity. All these activities are performed in parallel with the adequate information of the expert system directly, by the human operator, about the status parameters and, possibly, operating parameters of the steam generator components. The expert-robot system can work independently, but it can be connected and integrated in the control system of NPP, to take over and develop some of its functions. The activities concerning diagnosis and characterization of the state of steam generator components subsequent to control, as well as the forecast of their future behavior, are performed by means of the expert system. Due to these characteristics the expert-robot system can be used successfully in personnel training activities. (Author)

  4. Energy system analysis of marginal electricity supply in consequential LCA

    DEFF Research Database (Denmark)

    Lund, Henrik; Mathiesen, Brian Vad; Christensen, Per

    2010-01-01

    Background, aim and scope This paper discusses the identification of the environmental consequences of marginal electricity supplies in consequential life cycle assessments (LCA). According to the methodology, environmental characteristics can be examined by identifying affected activities, i...... in capacity but can be characterised as a complex set of affected electricity and heat supply technologies. A long-term YAM technology is identified for the Danish BAU2030 system in the case of three different long-term marginal changes in capacity, namely coal, natural gas or wind power. Discussion Four...... of four different situations are provided. We suggest that the technology mix with the installation of natural gas or coal power plant is applied as the marginal capacity. Conclusions The environmental consequences of marginal changes in electricity supply cannot always be represented solely by long...

  5. Feedstock and Conversion Supply System Design and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Jacobson, J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mohammad, R. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Cafferty, K. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kenney, K. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Searcy, E. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hansen, J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The success of the earlier logistic pathway designs (Biochemical and Thermochemical) from a feedstock perspective was that it demonstrated that through proper equipment selection and best management practices, conventional supply systems (referred to in this report as “conventional designs,” or specifically the 2012 Conventional Design) can be successfully implemented to address dry matter loss, quality issues, and enable feedstock cost reductions that help to reduce feedstock risk of variable supply and quality and enable industry to commercialize biomass feedstock supply chains. The caveat of this success is that conventional designs depend on high density, low-cost biomass with no disruption from incremental weather. In this respect, the success of conventional designs is tied to specific, highly productive regions such as the southeastern U.S. which has traditionally supported numerous pulp and paper industries or the Midwest U.S for corn stover.

  6. Building a new control system for the cyclotron power supplies

    International Nuclear Information System (INIS)

    Kormany, Z.; Lakatos, T.; Kovacs, P.; Szuecs, I.; Ander, I.

    2000-01-01

    Complete text of publication follows. The MGC cyclotron of the ATOMKI is a multi-particle and variable-energy machine with a rather complicated beam transport system. As a consequence, the current or voltage value of numerous power supplies should be set and adjusted by the operators during a typical run. The original control system of the cyclotron provides a traditional control desk for this purpose where the requested values can be set by using selector switches and up/down tumblers. The adjustment process with this system is completely manual and rather slow - every power supply unit gets its starting value one after the other and it typically takes 10 to 20 minutes to change the whole setting. Another disadvantage of the present system is the poor reproducibility / the analogue panel meters of the control desk cannot provide the required precision to exactly repeat a former setting. To overcome the above difficulties and speed up the adjustment process of the cyclotron and the beam transport lines, a new control system for the power supplies has been designed and is under implementation within the framework of our modernization project. Supported by the International Atomic Energy Agency, Technical Assistance Program - Project Code Number: HUN/4/013. The control of the power supplies will be changed to digital - the analogue control signals of the power stages will be produced by the D/A, the current and voltage values will be read by the A/D conversion modules of a programmable logic controller (PLC). The transition to digital control requires the development of special interface units. To separate completely the control and measuring channels from each other, they are isolated from the PLC-ground by applying opto-isolators. A two-channel (control and measurement) linear interface circuit built around the TIL 300 optical isolators has been designed, assembled and tested. It has been verified that the linearity and the precision of this circuit fulfills the

  7. Supply systems of forest chip production in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Kaerhae, K. (Metsaeteho Oy, Helsinki (Finland)), e-mail: kalle.karha@metsateho.fi

    2010-07-01

    The Metsaeteho study investigated how logging residue chips, stump wood chips, and chips from small-diameter thinning wood and large-sized (rotten) roundwood used by heating and power plants were produced in Finland in 2009. Almost all the major forest chip suppliers in Finland were involved in the study. The total volume of forest chips supplied in 2009 by these suppliers was 8,4 TWh. The study was implemented by conducting an e-mail questionnaire survey and telephone interviews. Research data was collected from March-May, 2010. The majority of the logging residue chips and chips from small-diameter thinning wood were produced using the roadside chipping supply system in Finland in 2009. The chipping at plant supply system was also significant in the production of logging residue chips. Nearly 70 % of all stump wood chips consumed were comminuted at the plant and 28 % at terminals. The role of the terminal chipping supply system was also significant in the production of chips from logging residues and small-diameter wood chips. When producing chips from large-sized (rotten) roundwood, similarly roughly 70 % of chips were comminuted at plants and 23 % at terminals. (orig.)

  8. High-Voltage Power Supply System for Laser Isotope Separation

    Energy Technology Data Exchange (ETDEWEB)

    Ketaily, E.C.; Buckner, R.P.; Uhrik, R.L.

    1979-06-26

    This report presents several concepts for Laser High-Voltage Power Supply (HVPS) Systems for a Laser Isotope Separation facility. Selection of equipments and their arrangement into operational systems is based on proven designs and on application concepts now being developed. This report has identified a number of alternative system arrangements and has provided preliminary cost estimates for each. The report includes a recommendation for follow-on studies that will further define the optimum Laser HVPS Systems. Brief descriptions are given of Modulator/Regulator circuit trade-offs, system control interfaces, and their impact on costs.

  9. High-Voltage Power Supply System for Laser Isotope Separation

    International Nuclear Information System (INIS)

    Ketaily, E.C.; Buckner, R.P.; Uhrik, R.L.

    1979-01-01

    This report presents several concepts for Laser High-Voltage Power Supply (HVPS) Systems for a Laser Isotope Separation facility. Selection of equipments and their arrangement into operational systems is based on proven designs and on application concepts now being developed. This report has identified a number of alternative system arrangements and has provided preliminary cost estimates for each. The report includes a recommendation for follow-on studies that will further define the optimum Laser HVPS Systems. Brief descriptions are given of Modulator/Regulator circuit trade-offs, system control interfaces, and their impact on costs

  10. CLASSIFICATION OF THE MGR MAINTENANCE AND SUPPLY SYSTEM

    International Nuclear Information System (INIS)

    J.A. Ziegler

    1999-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) maintenance and supply system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P, ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998)

  11. Rehabilitation actions in water supply systems: effects on biofilm susceptibility

    OpenAIRE

    RAMOS MARTINEZ, EVA; Herrera Fernández, Antonio Manuel; Gutiérrez-Pérez, Joanna A.; Izquierdo Sebastián, Joaquín; Pérez García, Rafael

    2014-01-01

    Biofilm development in water supply systems (WSSs) depends on infrastructure and operational factors, apart from water quality. We have developed a methodology that considers WSSs hydraulic (operation) and physical (design) characteristics to identify areas with different biofilm development trends within a WSS. To achieve this aim we have used meta-analysis and multi-agent system label propagation via discriminant analysis. As a result, we recognise areas with different susceptibility to bio...

  12. Preliminary design of steam reformer in out-pile demonstration test facility for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Haga, Katsuhiro; Hino, Ryutaro; Inagaki, Yosiyuki; Hata, Kazuhiko; Aita, Hideki; Sekita, Kenji; Nishihara, Tetsuo; Sudo, Yukio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Yamada, Seiya

    1996-11-01

    One of the key objectives of HTTR is to demonstrate effectiveness of high-temperature nuclear heat utilization system. Prior to connecting a heat utilization system to HTTR, an out-pile demonstration test is indispensable for the development of experimental apparatuses, operational control and safety technology, and verification of the analysis code of safety assessment. For the first heat utilization system of HTTR, design of the hydrogen production system by steam reforming is going on. We have proposed the out-pile demonstration test plan of the heat utilization system and conducted preliminary design of the test facility. In this report, design of the steam reformer, which is the principal component of the test facility, is described. In the course of the design, two types of reformers are considered. The one reformer contains three reactor tubes and the other contains one reactor tube to reduce the construction cost of the test facility. We have selected the steam reformer operational conditions and structural specifications by analyzing the steam reforming characteristics and component structural strength for each type of reformer. (author)

  13. 400-MWe consolidated nuclear steam system (CNSS). 1255 MWt CNSS design/cost update

    International Nuclear Information System (INIS)

    1984-07-01

    Since 1976 Babcock and Wilcox (B and W) has been extensively involved in the development of a medium-sized (1255 MWt/400 MWe) reactor. Under the sponsorship of the U.S. Department of Energy (DOE) and through a contract with Oak Ridge National Laboratories (ORNL), B and W investigated the feasibility of the concept for utility power generation and cogenerated process heat. The potential benefits of the design, called the Consolidated Nuclear Steam System (CNSS), were also identified. This study provides an update of the CNSS design and cost reflecting current regulatory requirements and operating reactor experience. The study was funded by DOE through ORNL and was performed by B and W and UE and C

  14. 400-MWe Consolidated Nuclear Steam System (CNSS). 1200-MWt Phase 2A interim studies

    International Nuclear Information System (INIS)

    1978-09-01

    The Phase 2A interim studies of the Consolidated Nuclear Steam System (CNSS) consisted of a number of separate task studies addressing the design concepts developed during the Phase 1 study reported in BAW--1445. The purpose of the interim studies was to better establish overall concept feasibility from both a hardware and economic standpoint, to make modification and additions to the design where appropriate, and to understand and reduce the technical risks in critical areas of the design. The work on these task studies included input from Barberton, Mt. Vernon, and the Alliance Research Center as well as United Engineers and Constructors (UE and C). The UE and C work was carried out under a separate DOE contract

  15. Modeling of Spray System Operation under Hydrogen and Steam Emissions in NPP Containment during Severe Accident

    Directory of Open Access Journals (Sweden)

    Vadim E. Seleznev

    2011-01-01

    Full Text Available The paper describes one of the variants of mathematical models of a fluid dynamics process inside the containment, which occurs in the conditions of operation of spray systems in severe accidents at nuclear power plant. The source of emergency emissions in this case is the leak of the coolant or rupture at full cross-section of the main circulating pipeline in a reactor building. Leak or rupture characteristics define the localization and the temporal law of functioning of a source of emergency emission (or accrued operating of warmed up hydrogen and steam in the containment. Operation of this source at the course of analyzed accident models should be described by the assignment of the relevant Dirichlet boundary conditions. Functioning of the passive autocatalytic recombiners of hydrogen is described in the form of the complex Newton boundary conditions.

  16. 400-MWe Consolidated Nuclear Steam System (CNSS). 1200-MWt Phase 2A interim studies. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    1978-09-01

    The Phase 2A interim studies of the Consolidated Nuclear Steam System (CNSS) consisted of a number of separate task studies addressing the design concepts developed during the Phase 1 study reported in BAW--1445. The purpose of the interim studies was to better establish overall concept feasibility from both a hardware and economic standpoint, to make modification and additions to the design where appropriate, and to understand and reduce the technical risks in critical areas of the design. The work on these task studies included input from Barberton, Mt. Vernon, and the Alliance Research Center as well as United Engineers and Constructors (UE and C). The UE and C work was carried out under a separate DOE contract.

  17. Oil and gas platforms with steam bottoming cycles: System integration and thermoenvironomic evaluation

    DEFF Research Database (Denmark)

    Nguyen, Tuong-Van; Tock, Laurence; Breuhaus, Peter

    2014-01-01

    The integration of steam bottoming cycles on oil and gas platforms is currently regarded as the most promising option for improving the performance of these energy-intensive systems. In this paper, a North Sea platform is taken as case study, and a systematic analysis of its energy requirements...... cooling utility, and (iv) the weight limitations on the platform are quantitatively assessed. The results illustrate the benefits of converting the gas turbine process into a combined cycle, since the fuel gas consumption and the total CO2-emissions can be reduced by more than 15 %. Using the cooling...... water from the processing plant reveals to be more profitable than using seawater, as the additional pumping power outweighs the benefit of using a cooling medium at a temperature of about 8 °C lower. This study highlights thereby the importance of analysing energy savings and recovery options...

  18. Manufacturing of large and integral-type steel forgings for nuclear steam supply system components

    International Nuclear Information System (INIS)

    Kawaguchi, S.; Tsukada, H.; Suzuki, K.; Sato, I.; Onodera, S.

    1986-01-01

    Forgings for the reactor pressure vessel (RPV) of the pressurized heavy water reactor (PHWR) 700 MWe, which is composed of seven major parts and nozzles totaling about 965 tons, were successfully developed. These forgings are: 1. Flanges: an outside diameter of 8440 mm and a weight of 238 tons max, requiring an ingot of 570 tons. 2. Shells and torus: an outside diameter of about 8000 mm with large height. 3. Cover dome: a diameter of 6800 mm and a thickness of 460 mm, requiring a blank forging before forming of 8000 mm in diameter and 550 m thick. The material designation is 20Mn-Mo-Ni 5 5 (equivalent to SA508, Class 3). In this paper, the manufacturing of and the properties of such large and integral forgings are discussed, including an overview of manufacturing processes for ultralarge-sized forgings over the last two decades

  19. A methodology for the design of photovoltaic water supply systems

    International Nuclear Information System (INIS)

    Vilela, O.C.; Fraidenraich, N.

    2001-01-01

    Photovoltaic pumping systems are used nowadays as a valuable alternative to supply water to communities living in remote rural areas. Owing to the seasonal variation and the stochastic behavior of solar radiation, at certain times the supply of water may not be able to meet demand. A study has been made of the relationship between water pumping capacity, reservoir size and water demand, for a given water deficit. As a result, curves of equal water deficit (iso-deficit lines) can be obtained for various combinations of PV pumping capacity and reservoir size. A methodology to generate those curves is described, using as its main tool the characteristic curve of the system, that is, the relationship between water flow and collected solar radiation. The characteristic curve represents the combined behavior of the water pumping system and the well. The influence of the minimum collected solar radiation level, necessary to start the system's operation (the critical radiation level I C ). is also analyzed. Results show that PV pumping systems with different characteristic curves, but with the same critical levels, yield the same set of iso-deficit lines. This drastically reduces the number of necessary solutions to those corresponding to a few values of I C . Iso-deficit lines, calculated for the locality of Recife (PE), Brazil, are used to illustrate the sizing procedure PV water supply systems. (author)

  20. Reliability analysis of self-supply system of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Kuklik, B.

    The results are summarized of the fault tree analysis of the V-1 power plant self-consumption system. The 6 kV busbars providing power for the main circulating pumps, the steam generator feed pumps and other important components including the 0.4 kV busbars are of the highest importance for nuclear safety. A fault tree analysis was also made of the emergency core cooling system of the reactor. Dangerous faults are defined and fault trees are developed. A brief description is given of the calculation algorithm for a digital computer. Some results are discussed. The calculated reliability of the emergency core cooling system is 10 5 years, of the 6 kV busbars it is 6.6x10 4 years. In case of a permanent or a long-term outage of the 220 kV stand-bye power supply, the system reliability is reduced to 7x10 2 years. (Z.M.)

  1. Simulation and assessment of agricultural biomass supply chain systems

    Directory of Open Access Journals (Sweden)

    D. Pavlou

    2017-05-01

    Full Text Available Agricultural biomass supply chain consists of a number of interacted sequential operations affected by various variables, such as weather conditions, machinery systems, and biomass features. These facts make the process of biomass supply chain as a complex system that requires computational tools, e.g. simulation and mathematical models, for their assessment and analysis. A biomass supply chain simulation model developed on the ExtendSim 8 simulation environment is presented in this paper. A number of sequential operations are applied in order biomass to be mowed, harvested, and transported to a biorefinery facility. Different operational scenarios regarding the travel distance between field and biorefinery facility, number of machines, and capacity of machines are analyzed showing how different parameters affect the processes within biomass supply chain in terms of time and cost. The results shown that parameters such as area of the field, travel distance, number of available machines, capacity of the machines, etc. should be taken into account in order a less time and/ or cost consuming machinery combination to be selected.

  2. Research on assurance system of nuclear fuel supply (Contract research)

    International Nuclear Information System (INIS)

    Kobayashi, Naoki; Naoi, Yosuke; Wakabayashi, Shuji; Tazaki, Makiko; Senzaki, Masao

    2010-03-01

    Assurance of supply (AOS) of nuclear fuel is a special arrangement in case of nuclear fuel supply disruption caused by political reasons other than nonproliferation. It aims to support a stable supply of nuclear fuel while avoiding unnecessary spread of sensitive enrichment technology. Current discussions on AOS have been initiated by the IAEA Director-General's article published in The Economist entitled 'Towards a Safer World' Oct. 2003. Since then, various proposals on AOS have been presented. In order to facilitate international discussions on AOS, authors have conducted studies of AOS system based on Japanese Government's proposal 'IAEA Standby Arrangement System (INFCIRC/683)'. In this paper, we gave an overview of discussions on AOS since World War II, and elaborated on some of current proposals. We have been able to discuss feasibility of AOS system more specifically by including additional costs and period required for AOS, and to present a system which could work as a practical system. Issues we have tried to tackle here include definitions of AOS, and roles of consumer states, supplier states, IAEA and nuclear industries. We present some solutions including broadening coverage of AOS, declaration by supplier states on AOS, establishing advisory committee in the IAEA on the actual application of AOS, and setting up an IAEA fund for AOS. (author)

  3. Research on assurance system of nuclear fuel supply (Contract research)

    International Nuclear Information System (INIS)

    Kobayashi, Naoki; Naoi, Yosuke; Wakabayashi, Shuji; Tazaki, Makiko; Senzaki, Masao

    2010-08-01

    Assurance of supply (AOS) of nuclear fuel is a special arrangement in case of nuclear fuel supply disruption caused by political reasons other than nonproliferation. It aims to support a stable supply of nuclear fuel while avoiding spread of sensitive enrichment technology. Current discussions on AOS have been initiated by the IAEA Director-General's article published in The Economist entitled 'Towards a Safer World' Oct. 2003. Since then, various proposals on AOS have been presented. In order to facilitate international discussions on AOS, authors have conducted studies of AOS system based on Japanese Government's proposal 'IAEA Standby Arrangement System (INFCIRC/683)'. In this paper, we have been able to discuss feasibility of AOS system more specifically by including additional costs and period required for AOS, and to present a system which could work as a practical system. Issues we have tried to tackle here include definitions of AOS, and roles of consumer States, supplier States, IAEA and nuclear industries. We present some solutions including broadening coverage of AOS, declaration by supplier States on AOS, establishing advisory committee in the IAEA on the actual application of AOS, and setting up an IAEA fund for AOS. (author)

  4. Dual turbine power plant and a reheat steam bypass flow control system for use therein

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegtnes, K.O.

    1977-01-01

    An electric power plant having dual turbine-generators connected to a steam source that includes a high temperature gas cooled nuclear reactor is described. Each turbine comprises a high pressure portion operated by superheat steam and an intermediate-low pressure portion operated by reheat steam; a bypass line is connected across each turbine portion to permit a desired minimum flow of steam from the source at times when the combined flow of steam through the turbine is less than the minimum. Coolant gas is propelled through the reactor by a circulator which is driven by an auxiliary turbine which uses steam exhausted from the high pressure portions and their bypass lines. The pressure of the reheat steam is controlled by a single proportional-plus-integral controller which governs the steam flow through the bypass lines associated with the intermediate-low pressure portions. At times when the controller is not in use its output signal is limited to a value that permits an unbiased response when pressure control is resumed, as in event of a turbine trip. 25 claims, 2 figures

  5. Components and system tests on the RFX toroidal power supply

    International Nuclear Information System (INIS)

    Toigo, V.; Zanotto, L.; Gaio, E.; Perna, M.; Bordignon, P.; Coffetti, A.; Novaro, R.; Bertolotto, P.; Rinaldi, E.; Villa, G.

    2005-01-01

    The paper deals with the component and system tests performed on the new toroidal power supply system of the RFX experiment. The high technological innovation of the system required a deep experimental characterization and validation campaign; special factory tests were performed on prototypes of single components aimed at verifying the most critical design aspects. Consequently an articulated series of tests were performed, based on a step-by-step approach to achieve the desired coordinate operation of the whole system. The test procedures and the most significant results are described in the paper

  6. Electrical supply for MFTF-B superconducting magnet system

    International Nuclear Information System (INIS)

    Shimer, D.W.; Owen, E.W.

    1985-01-01

    The MFTF-B magnet system consists of 42 superconducting magnets which must operate continuously for long periods of time. The magnet power supply system is designed to meet the operational requirements of accuracy, flexibility, and reliability. The superconducting magnets require a protection system to protect against critical magnet faults of quench, current lead overtemperature, and overcurrent. The protection system is complex because of the large number of magnets, the strong coupling between magnets, and the high reliability requirement. This paper describes the power circuits and the components used in the design

  7. Environmental inventories for future electricity supply systems for Switzerland

    International Nuclear Information System (INIS)

    Dones, R.; Gantner, U.; Hirschberg, S.; Doka, G.; Knoepfel, I.

    1996-02-01

    This report provides the analysis of environmental inventories for selected electricity supply systems considered as possible options to meet the expected electricity demand in Switzerland in year 2030. The work was carried out by the Paul Scherrer Institute (PSI) and the Swiss Federal Institute of Technology Zurich (ETHZ), and was supported by the Swiss Association of Producers and Distributers of Electricity (VSE). Two possible electricity demand level cases were postulated by VSE, both under the basic assumption of economic growth: a high-growth demand case corresponding to a yearly increase of 2% from year 1995 to year 2010 and 1% from year 2010 to year 2030, and a low-growth demand case corresponding to a yearly increase of 1% from year 1995 to year 2010 and 0.5% from year 2010 to year 2030. The base (i.e. secured) supply in year 2030 will be, according to VSE, totally dominated by hydro with rather minor contributions from combined heat-and-power plants, small gas turbines, incinerators and solar photovoltaic plants. Due to decommissioning of the currently operating nuclear power plants and expiration of long-term electricity import contracts there will eventually occur a gap between the postulated electricity demand and the base supply. VSE provided seven options to cover this gap, defined in terms of mixes with different contributions from gas, coal, nuclear and solar chains; in this context a distinction is also made with respect to shares of domestic and imported electricity. The systems considered represent advanced technologies, regarded as either typical or most suitable for the Swiss conditions. System-specific input to the present analysis has been partially generated based on direct contacts with the industry. Life Cycle Analysis (LCA) was used to establish environmental inventories for the systems analysed. The analysis has been performed on three levels: 1) individually for each system considered, 2) comparison of systems, 3) comparison of supply

  8. Environmental inventories for future electricity supply systems for Switzerland

    Energy Technology Data Exchange (ETDEWEB)

    Dones, R; Gantner, U; Hirschberg, S [Paul Scherrer Inst. (PSI), Villigen (Switzerland); Doka, G; Knoepfel, I [Eidgenoessische Technische Hochschule, Zurich (Switzerland)

    1996-02-01

    This report provides the analysis of environmental inventories for selected electricity supply systems considered as possible options to meet the expected electricity demand in Switzerland in year 2030. Two possible electricity demand level cases were postulated by VSE, both under the basic assumption of economic growth: a high-growth demand case corresponding to a yearly increase of 2% from year 1995 to year 2010 and 1% from year 2010 to year 2030, and a low-growth demand case corresponding to a yearly increase of 1% from year 1995 to year 2010 and 0.5% from year 2010 to year 2030. The base (i.e. secured) supply in year 2030 will be, according to VSE, totally dominated by hydro with rather minor contributions from combined heat-and-power plants, small gas turbines, incinerators and solar photovoltaic plants. Due to decommissioning of the currently operating nuclear power plants and expiration of long-term electricity import contracts there will eventually occur a gap between the postulated electricity demand and the base supply. VSE provided seven options to cover this gap, defined in terms of mixes with different contributions from gas, coal, nuclear and solar chains; in this context a distinction is also made with respect to shares of domestic and imported electricity. The systems considered represent advanced technologies, regarded as either typical or most suitable for the Swiss conditions. System-specific input to the present analysis has been partially generated based on direct contacts with the industry. Life Cycle Analysis (LCA) was used to establish environmental inventories for the systems analysed. The analysis has been performed on three levels:(1) individually for each system considered, (2) comparison of systems, (3) comparison of supply options. Results are also provided for these three levels.

  9. Interdisciplinary semantic model for managing the design of a steam-assisted gravity drainage tooling system

    Directory of Open Access Journals (Sweden)

    Michael Leitch

    2018-01-01

    Full Text Available Complex engineering systems often require extensive coordination between different expert areas in order to avoid costly design iterations and rework. Cyber-physics system (CPS engineering methods could provide valuable insights to help model these interactions and optimize the design of such systems. In this work, steam assisted gravity drainage (SAGD, a complex oil extraction process that requires deep understanding of several physical-chemical phenomena, is examined whereby the complexities and interdependencies of the system are explored. Based on an established unified feature modeling scheme, a software modeling framework is proposed to manage the design process of the production tools used for SAGD oil extraction. Applying CPS methods to unify complex phenomenon and engineering models, the proposed CPS model combines effective simulation with embedded knowledge of completion tooling design in order to optimize reservoir performance. The system design is expressed using graphical diagrams of the unified modelling language (UML convention. To demonstrate the capability of this system, a distributed research group is described, and their activities coordinated using the described CPS model.

  10. Out-of-pile demonstration test of HTTR hydrogen production system structure and fabrication technology of steam reformer. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Inagaki, Yoshiyuki; Ouchi, Yoshihiro; Fujisaki, Katsuo; Kato, Michio; Uno, Hisao; Hayashi, Koji; Aita, Hideki [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    1999-10-01

    A hydrogen production system by steam reforming of natural gas, chemical reaction; CH{sub 4}+H{sub 2}O = 3H{sub 2}+CO, is to be the first heat utilization system of the HTTR. Prior to coupling of the steam reforming system with the HTTR, an out-of-pile test facility is presently under construction in order to confirm safety, controllability and performance of the steam reforming system under simulated operational conditions of the HTTR hydrogen production system. The out-of-pile test facility, using an electric heater as a reactor substitute, simulates key components downstream an intermediate heat exchanger of the HTTR hydrogen production system on a scale of 1 to 30 with a hydrogen production rate of 110 Nm{sup 3}/h. A steam reformer (SR) is a key component to produce hydrogen by steam reforming of natural gas. A bayonet-type catalyst tube was applied to the SR of the out-of-pile test facility in order to enhance the heat utilization rate. Also to promote heat transfer, the thickness of the catalyst tube should be decreased to 10 mm while augmenting heat transfer by fins formed on the outer surface of the catalyst tube. Therefore, the catalyst tube was designed on the basis of pressure difference between helium and process gases instead of total pressure of them. This design method was authorized for the first time in Japan. Furthermore, a function of explosion proof was applied to the SR because it contains inflammable gas and electric heater. This report describes the structure of the SR as well as the authorization both of the design method of the catalyst tube and the explosion proof function of the SR. (author)

  11. Out-of-pile demonstration test of HTTR hydrogen production system structure and fabrication technology of steam reformer. Contract research

    International Nuclear Information System (INIS)

    Inagaki, Yoshiyuki; Ouchi, Yoshihiro; Fujisaki, Katsuo; Kato, Michio; Uno, Hisao; Hayashi, Koji; Aita, Hideki

    1999-10-01

    A hydrogen production system by steam reforming of natural gas, chemical reaction; CH 4 +H 2 O = 3H 2 +CO, is to be the first heat utilization system of the HTTR. Prior to coupling of the steam reforming system with the HTTR, an out-of-pile test facility is presently under construction in order to confirm safety, controllability and performance of the steam reforming system under simulated operational conditions of the HTTR hydrogen production system. The out-of-pile test facility, using an electric heater as a reactor substitute, simulates key components downstream an intermediate heat exchanger of the HTTR hydrogen production system on a scale of 1 to 30 with a hydrogen production rate of 110 Nm 3 /h. A steam reformer (SR) is a key component to produce hydrogen by steam reforming of natural gas. A bayonet-type catalyst tube was applied to the SR of the out-of-pile test facility in order to enhance the heat utilization rate. Also to promote heat transfer, the thickness of the catalyst tube should be decreased to 10 mm while augmenting heat transfer by fins formed on the outer surface of the catalyst tube. Therefore, the catalyst tube was designed on the basis of pressure difference between helium and process gases instead of total pressure of them. This design method was authorized for the first time in Japan. Furthermore, a function of explosion proof was applied to the SR because it contains inflammable gas and electric heater. This report describes the structure of the SR as well as the authorization both of the design method of the catalyst tube and the explosion proof function of the SR. (author)

  12. Steam drums

    International Nuclear Information System (INIS)

    Crowder, R.

    1978-01-01

    Steam drums are described that are suitable for use in steam generating heavy water reactor power stations. They receive a steam/water mixture via riser headers from the reactor core and provide by means of separators and driers steam with typically 0.5% moisture content for driving turbines. The drums are constructed as prestressed concrete pressure vessels in which the failure of one or a few of the prestressing elements does not significantly affect the overall strength of the structure. The concrete also acts as a radiation shield. (U.K.)

  13. Power supply system for negative ion source at IPR

    Science.gov (United States)

    Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K. G.; Soni, Jignesh; Bandyopadhyay, M.; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun

    2010-02-01

    The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ~5 × 1012 cm-3, from which ~ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (~15 to 35kV), and high current (~ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (~50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (~ 50kV) isolated from the system. The paper shall present the

  14. Power supply system for negative ion source at IPR

    International Nuclear Information System (INIS)

    Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K G; Soni, Jignesh; Bandyopadhyay, M; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun

    2010-01-01

    The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ∼5 x 10 12 cm -3 , from which ∼ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (∼15 to 35kV), and high current (∼ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (∼50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (∼ 50kV) isolated from the system. The paper shall

  15. Defining regulatory requirements for water supply systems in Vietnam

    Directory of Open Access Journals (Sweden)

    Deryushev Leonid Georgiyevich

    2014-01-01

    Full Text Available In the article the authors offer their suggestions for improving the reliability of the standardization requirements for water supply facilities in Vietnam, as an analog of building regulations of Russia 31.13330.2012. In Russia and other advanced countries the reliability of the designed water supply systems is usual to assess quantitatively. Guidelines on the reliability assessment of water supply systems and facilities have been offered by many researchers, but these proposals are not officially approved. Some methods for assessing the reliability of water supply facilities are informally used in practice when describing their quality. These evaluation methods are simple and useful. However, the given estimations defy common sense and regulatory requirements used by all the organizations, ministries and departments, for example, of Russia, in the process of allowances for restoration and repair of water supply facilities. Inadequacy of the water supply facilities assessment is shown on the example of assessing the reliability of pipeline system. If we take MTBF of specific length of the pipeline as reliability index for a pipeline system, for example, 5 km, a pipeline of the similar gauge, material and working conditions with the length of 5 m, according to the estimation on the basis of non-official approach, must have a value of MTBF 1000 times greater than with the length of 5 km. This conclusion runs counter to common sense, for the reason that all the pipes in the area of 5 km are identical, have the same load and rate of wear (corrosion, fouling, deformation, etc.. It was theoretically and practically proved that products of the same type in the same operating conditions (excluding determined impact of a person, work as an entity, which MTBF is equal to the average lifetime. It is proposed to take the average service life as a reliability indicator of a pipeline. Durability, but not failsafety of the pipe guarantees pipeline functioning

  16. Vulnerability Assessment of Water Supply Systems: Status, Gaps and Opportunities

    Science.gov (United States)

    Wheater, H. S.

    2015-12-01

    Conventional frameworks for assessing the impacts of climate change on water resource systems use cascades of climate and hydrological models to provide 'top-down' projections of future water availability, but these are subject to high uncertainty and are model and scenario-specific. Hence there has been recent interest in 'bottom-up' frameworks, which aim to evaluate system vulnerability to change in the context of possible future climate and/or hydrological conditions. Such vulnerability assessments are generic, and can be combined with updated information from top-down assessments as they become available. While some vulnerability methods use hydrological models to estimate water availability, fully bottom-up schemes have recently been proposed that directly map system vulnerability as a function of feasible changes in water supply characteristics. These use stochastic algorithms, based on reconstruction or reshuffling methods, by which multiple water supply realizations can be generated under feasible ranges of change in water supply conditions. The paper reports recent successes, and points to areas of future improvement. Advances in stochastic modeling and optimization can address some technical limitations in flow reconstruction, while various data mining and system identification techniques can provide possibilities to better condition realizations for consistency with top-down scenarios. Finally, we show that probabilistic and Bayesian frameworks together can provide a potential basis to combine information obtained from fully bottom-up analyses with projections available from climate and/or hydrological models in a fully integrated risk assessment framework for deep uncertainty.

  17. Evaluation of Supply Chain Management Systems Used in Civil Engineering

    Science.gov (United States)

    Tomczak, Michał; Rzepecki, Łukasz

    2017-10-01

    One of the most important factors which have an effect on the cost and time of the building process is the organization of physical resources and the information flow structure. Depending on how effective this system is, a building project may end with a success or a failure. Because of many conditions of the construction executing and different needs of the contractors, there are different Supply Chain Management (SCM) systems connected with supplying construction projects: single-stage, multi-stage or combined. The article presents a comparative analysis of construction SCM systems based on a modified fuzzy AHP. The modification of this method is based on the use of interval type-2 fuzzy sets to aggregate evaluation according to the idea proposed by Mikhailov. The use of such a model of group preferences of decision-makers, makes it possible to take into consideration both the linguistic imprecision of an evaluation and the small number of experts. The weight values of specific criteria and the final scale vector of considered variants are obtained during the analysis. This may give a recommendation to general contractors in construction projects about which evaluation criteria and supply systems are preferred.

  18. Smart Power Supply Systems for Mission Critical Facilities

    Science.gov (United States)

    Hirose, Keiichi; Babasaki, Tadatoshi

    To develop the advanced and rich life, and the also economy and social activity continuously, various types of energy are necessary. At the same time, to protect the global environment and to prevent the depletion of natural resources, the effective and moreover efficient use of energy is becoming important. Electric power is one of the most important forms of energy for our life and society. This paper describes topics and survey results of technical trends regarding the electric power supply systems which are playing a core role as the important infrastructure to support the emergence of information-oriented society. Specifically, the power supply systems that enhance high power quality and reliability (PQR) are important for the steady growth of information and communication services. The direct current (DC) power, which has been used for telecommunications power systems and information and communications technologies (ICT), enables existing utilities' grid and distributed energy resources to keep a balance between supply and demand of small-scaled power systems or microgirds. These techniques are expected to be part of smartgrid technologies and facilitate the installation of distributed generators in mission critical facilities.

  19. Impact of Hybrid Water Supply on the Centralised Water System

    Directory of Open Access Journals (Sweden)

    Robert Sitzenfrei

    2017-11-01

    Full Text Available Traditional (technical concepts to ensure a reliable water supply, a safe handling of wastewater and flood protection are increasingly criticised as outdated and unsustainable. These so-called centralised urban water systems are further maladapted to upcoming challenges because of their long lifespan in combination with their short-sighted planning and design. A combination of (existing centralised and decentralised infrastructure is expected to be more reliable and sustainable. However, the impact of increasing implementation of decentralised technologies on the local technical performance in sewer or water supply networks and the interaction with the urban form has rarely been addressed in the literature. In this work, an approach which couples the UrbanBEATS model for the planning of decentralised strategies together with a water supply modelling approach is developed and applied to a demonstration case. With this novel approach, critical but also favourable areas for such implementations can be identified. For example, low density areas, which have high potential for rainwater harvesting, can result in local water quality problems in the supply network when further reducing usually low pipe velocities in these areas. On the contrary, in high demand areas (e.g., high density urban forms there is less effect of rainwater harvesting due to the limited available space. In these high density areas, water efficiency measures result in the highest savings in water volume, but do not cause significant problems in the technical performance of the potable water supply network. For a more generalised and case-independent conclusion, further analyses are performed for semi-virtual benchmark networks to answer the question of an appropriate representation of the water distribution system in a computational model for such an analysis. Inappropriate hydraulic model assumptions and characteristics were identified for the stated problem, which have more

  20. Steam generator life management

    International Nuclear Information System (INIS)

    Tapping, R.L.; Nickerson, J.; Spekkens, P.; Maruska, C.

    1998-01-01

    Steam generators are a critical component of a nuclear power reactor, and can contribute significantly to station unavailability, as has been amply demonstrated in Pressurized Water Reactors (PWRs). CANDU steam generators are not immune to steam generator degradation, and the variety of CANDU steam generator designs and tube materials has led to some unexpected challenges. However, aggressive remedial actions, and careful proactive maintenance activities, have led to a decrease in steam generator-related station unavailability of Canadian CANDUs. AECL and the CANDU utilities have defined programs that will enable existing or new steam generators to operate effectively for 40 years. Research and development work covers corrosion and mechanical degradation of tube bundles and internals, chemistry, thermal hydraulics, fouling, inspection and cleaning, as well as provision for specially tool development for specific problem solving. A major driving force is development of CANDU-specific fitness-for-service guidelines, including appropriate inspection and monitoring technology to measure steam generator condition. Longer-range work focuses on development of intelligent on-line monitoring for the feedwater system and steam generator. New designs have reduced risk of corrosion and fouling, are more easily inspected and cleaned, and are less susceptible to mechanical damage. The Canadian CANDU utilities have developed programs for remedial actions to combat degradation of performance (Gentilly-2, Point Lepreau, Bruce A/B, Pickering A/B), and have developed strategic plans to ensure that good future operation is ensured. This report shows how recent advances in cleaning technology are integrated into a life management strategy, discusses downcomer flow measurement as a means of monitoring steam generator condition, and describes recent advances in hideout return as a life management tool. The research and development program, as well as operating experience, has identified

  1. Reduction in infection risk through treatment of microbially contaminated surfaces with a novel, portable, saturated steam vapor disinfection system.

    Science.gov (United States)

    Tanner, Benjamin D

    2009-02-01

    Surface-mediated infectious disease transmission is a major concern in various settings, including schools, hospitals, and food-processing facilities. Chemical disinfectants are frequently used to reduce contamination, but many pose significant risks to humans, surfaces, and the environment, and all must be properly applied in strict accordance with label instructions to be effective. This study set out to determine the capability of a novel chemical-free, saturated steam vapor disinfection system to kill microorganisms, reduce surface-mediated infection risks, and serve as an alternative to chemical disinfectants. High concentrations of Escherichia coli, Shigella flexneri, vancomycin-resistant Enterococcus faecalis (VRE), methicillin-resistant Staphylococcus aureus (MRSA), Salmonella enterica, methicillin-sensitive Staphylococcus aureus, MS2 coliphage (used as a surrogate for nonenveloped viruses including norovirus), Candida albicans, Aspergillus niger, and the endospores of Clostridium difficile were dried individually onto porous clay test surfaces. Surfaces were treated with the saturated steam vapor disinfection system for brief periods and then numbers of surviving microorganisms were determined. Infection risks were calculated from the kill-time data using microbial dose-response relationships published in the scientific literature, accounting for surface-to-hand and hand-to-mouth transfer efficiencies. A diverse assortment of pathogenic microorganisms was rapidly killed by the steam disinfection system; all of the pathogens tested were completely inactivated within 5 seconds. Risks of infection from the contaminated surfaces decreased rapidly with increasing periods of treatment by the saturated steam vapor disinfection system. The saturated steam vapor disinfection system tested for this study is chemical-free, broadly active, rapidly efficacious, and therefore represents a novel alternative to liquid chemical disinfectants.

  2. Fault Analysis of ITER Coil Power Supply System

    International Nuclear Information System (INIS)

    Song, In Ho; Jun, Tao; Benfatto, Ivone

    2009-01-01

    The ITER magnet coils are all designed using superconductors with high current carrying capability. The Toroidal Field (TF) coils operate in a steadystate mode with a current of 68 kA and discharge the stored energy in case of quench with using 9 interleaved Fast Discharge Units (FDUs). The Central Solenoid (CS) coils and Poloidal Field (PF) coils operate in a pulse mode with currents of up to 45 kA and require fast variation of currents inducing more than 10 kV during normal operation on the coil terminals using Switching Network (SN) systems (CSs, PF1 and 6) and Booster and VS converters (PF2 to 5), which are series connected to Main converters. SN and FDU systems comprise high current DC circuit breakers and resistors for generating high voltage (SN) and to dissipate magnetic energy (FDUs). High transient voltages can arise due to the switching operation of SN and FD and the characteristics of resistors and stray components of DC distribution systems. Also, faults in power supply control such as shorts or grounding faults can produce higher voltages between terminals and between terminal and ground. Therefore, the design of the coil insulation, coil terminal regions, feeders, feed throughs, pipe breaks and instrumentation must take account of these high voltages during normal and abnormal conditions. Voltage insulation level can be defined and it is necessary to test the coils at higher voltages, to be sure of reliable performance during the lifetime of operation. This paper describes the fault analysis of the TF, CS and PF coil power supply systems, taking account of the stray parameter of the power supply and switching systems and inductively coupled superconducting coil models. Resistor grounding systems are included in the simulation model and all fault conditions such as converter hardware and software faults, switching system hardware and software faults, DC short circuits and single grounding faults are simulated. The occurrence of two successive faults

  3. Nonlinear Synergetic Governor Controllers for Steam Turbine Generators to Enhance Power System Stability

    Directory of Open Access Journals (Sweden)

    Xingbao Ju

    2017-07-01

    Full Text Available This paper proposes a decentralized nonlinear synergetic governor controller (NSGC for turbine generators to enhance power system stability by using synergetic control theory and the feedback linearization technique. The precise feedback linearization model of a turbine-generator with a steam valve control is obtained, at first, by using a feedback linearization technique. Then based on this model, a manifold is defined as a linear combination of the deviation of the rotor angle, speed deviation, and speed derivative. The control law of the proposed NSGC is deduced and the stability condition of the whole closed-loop system is subsequently analyzed. According to the requirement of the primary frequency regulation, an additional proportional integral (PI controller is designed to dynamically track the steady-state value of the rotor angle. Case studies are undertaken based on a single-machine infinite-bus system and the New England system, respectively. Simulation results show that the proposed NSGC can suppress the power oscillations and improve transient stability more effectively in comparison with the conventional proportional-integral-derivative (PID governor controller. Moreover, the proposed NSGC is robust to the variations of the system operating conditions.

  4. A study of industrial hydrogen and syngas supply systems

    Science.gov (United States)

    Amos, W. J.; Solomon, J.; Eliezer, K. F.

    1979-01-01

    The potential and incentives required for supplying hydrogen and syngas feedstocks to the U.S. chemical industry from coal gasification systems were evaluated. Future hydrogen and syngas demand for chemical manufacture was estimated by geographic area and projected economics for hydrogen and syngas manufacture was estimated with geographic area of manufacture and plant size as parameters. Natural gas, oil and coal feedstocks were considered. Problem areas presently affecting the commercial feasibility of coal gasification discussed include the impact of potential process improvements, factors involved in financing coal gasification plants, regulatory barriers affecting coal gasification, coal mining/transportation, air quality regulations, and competitive feedstock pricing barriers. The potential for making coal gasification the least costly H2 and syngas supply option. Options to stimulate coal gasification system development are discussed.

  5. Development of knowledge-based operator support system for steam generator water leak events in FBR plants

    International Nuclear Information System (INIS)

    Arikawa, Hiroshi; Ida, Toshio; Matsumoto, Hiroyuki; Kishida, Masako

    1991-01-01

    A knowledge engineering approach to operation support system would be useful in maintaining safe and steady operation in nuclear plants. This paper describes a knowledge-based operation support system which assists the operators during steam generator water leak events in FBR plants. We have developed a real-time expert system. The expert system adopts hierarchical knowledge representation corresponding to the 'plant abnormality model'. A technique of signal validation which uses knowledge of symptom propagation are applied to diagnosis. In order to verify the knowledge base concerning steam generator water leak events in FBR plants, a simulator is linked to the expert system. It is revealed that diagnosis based on 'plant abnormality model' and signal validation using knowledge of symptom propagation could work successfully. Also, it is suggested that the expert system could be useful in supporting FBR plants operations. (author)

  6. Steam generators and fuel engineering utilizing solid, liquid, gaseous and special fuels

    Energy Technology Data Exchange (ETDEWEB)

    Thor, G

    1983-01-01

    Provided were technological specifications and details in the design of brown coal fired steam generators, produced in the German Democratic Republic. These steam generators range in their capacity between 1.6 and more than 1,000 t/h. The appropriate coal feeding systems, water supply and cleaning equipment, coal pulverizers and ash removal units are also manufactured. Various schemes show the design of a 25 to 64 t/h, a 320 t/h and an 815 t/h brown coal steam generator. Specifications are given for series of fuel pulverizers available, for the water circulation system and steam evaporators. The VEB Dampferzeugerbau Berlin also offers steam generators for saliniferous brown coal with a steam capacity up to 125 t/h, steam generators for pulverized black coal with a capacity up to 350 t/h and oil and gas fired generators up to 250 t/h. The company has experience in combustion of biomass (sugar cane waste) with oil in steam generators of more than 100 t/h capacity, and in projecting firing systems for other biofuels including rice, peanut and coconut hulls, wood and bark. Multi-biofuel firing in combination with coal for steam generation is also regarded as possible. (In English)

  7. Power supply system for the TRIUMF KAON factory

    International Nuclear Information System (INIS)

    Reiniger, K.W.

    1991-05-01

    The TRIUMF KAON Factory consists of 5 rings, 3 of which are dc powered and 2 synchrotrons running at 50 Hz and 10 Hz, respectively. This paper deals with the power supply system envisaged for the accelerator as well as the experimental results obtained using dc-biased single and dual frequency resonant magnet excitation for the booster and driver synchrotrons. (Author) 6 refs., 8 figs

  8. Electronic supply system ''BING'' for vibrating wire strain gauges

    International Nuclear Information System (INIS)

    Himmler, H.

    1976-02-01

    In the Austrian project Prestressed Concrete Pressure Vessel-High Temperature Helium Test Rig a great number of strain gauges is to be monitored continuously. For these measurements an electronic supply equipment had to be developed and built. The problem was solved by the ''BING'' system, which transmits an electromagnetic impulse to the string of the strain gauge thus enabling a measurement of frequency and temperature. The equipment has been in use for 1 1/2 years without major troubles. (author)

  9. Systems for uninterrupted power supply; USV - ein starkes Stueck Sicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, D.; Soelter, W. [AEG SVS GmbH, Warstein-Belecke (Germany)

    1999-09-01

    The millennium bug is only one of the many potential hazards in information technology. Systems for uninterrupted power supply offer a solution. [German] Alle Welt spricht vom Jahr-2000-Problem (Y2K). Die Meinungen dazu reichen von Horror-Szenarien bis hin zum Ignorieren dieses Problems. Dabei steht fest: Das Jahr-2000-Problem ist nur eines unter vielen Gefahrenpotentialen fuer die Informationstechnik. Dabei lassen sich alle Stoerfaktoren, die aus der Energieversorgung resultieren mit einer USV beseitigen. USV sichern Geschaeftsablaeufe und Fertigungsprozesse. (orig.)

  10. Modern Solutions for Automation of Electrical Traction Power Supply Systems

    Directory of Open Access Journals (Sweden)

    Ana Mihaela Andreica

    2011-09-01

    Full Text Available This paper presents modern solutions for the automation of the electrical traction power supply system used in urban public transport (trams, trolleybuses and subway trains. The monitoring and control of this process uses SCADA distributed architectures, grouped around a central point (dispatcher who controls all field sensors, transmitters and actuators using programmable logical controllers. The presented applications refer to the Bucharest electrical transport infrastructure.

  11. The ITER poloidal field system: control and power supplies

    International Nuclear Information System (INIS)

    Mondino, P.L.; Benfatto, I.; Gribov, Y.; Matsukawa, M.; Odajima, K.; Portone, A.; Roshal, A.; Bareyt, B.; Bertolini, E.; Bottereau, J.M.; Huart, M.; Maschio, A.; Bulgakov, S.; Kuchinski, V.

    1995-01-01

    The paper reports the preliminary scenario of the ITER Poloidal Field (PF) system operation, the method used to evaluate the installed power, the basic structure of the circuits and finally the concepts of the preliminary design of control and power supply. The superconducting coils are energized from the HV Grid with conventional AC/DC converters. R and D is required for circuit breakers, make switches and resistors, the basic components of both the switching networks and the discharge circuits. (orig.)

  12. Development for a multi-purpose nuclear energy supply system

    International Nuclear Information System (INIS)

    Narabayashi, Tadashi; Shimazu, Yoichiro; Sato, Kotaro; Imamura, Mitsuru; Tsuji, Masashi

    2009-01-01

    Hokkaido is one of the four largest island of Japan located in the northern, most of the area, where the atmospheric temperature goes lower than the other area in winter. Thus, an average energy consumption per capita is larger in amount during cold seasons. Nowadays this energy is supplied by fossil fuels. On the other hand, problem of the green house gas emission should be controlled as much as possible in order to avoid global warming. From this point of view, the authors have discussed with local people on the possibility to utilize nuclear clean energy in the daily life in Hokkaido district. Recently some leaders in local towns become interested to such activities and they want information about nuclear energy and related systems. It is a very good chance for us to exchange information on nuclear energy with regards to public acceptance, fears of nuclear power or radiation, the extent of satisfaction to be sure for construction of urban nuclear plants and requirements for such plants. We prepared technical presentation materials and visited a selected towns and continued discussion in various aspects. For example, proposal of a proto type design concept of a small reactor, safety, heat energy supply system. The audience was mainly representatives of the towns firstly and gradually ordinal people also attended the meetings. Based on the information, it could be expected to establish a concept for such district energy supply system. In this paper, some examples and results through these activities are presented. (author)

  13. Nitrogen Gas Heating and Supply System for SST-1 Tokamak

    International Nuclear Information System (INIS)

    Khan, Ziauddin; Pathan, Firozkhan; Paravastu, Yuvakiran; George, Siju; Ramesh, Gattu; Bindu, Hima; Raval, Dilip C.; Thankey, Prashant; Dhanani, Kalpesh; Pradhan, Subrata

    2013-01-01

    Steady State Tokamak (SST-1) vacuum vessel baking as well as baking of the first wall components of SST-1 are essential to plasma physics experiments. Under a refurbishment spectrum of SST-1, the nitrogen gas heating and supply system has been fully refurbished. The SST-1 vacuum vessel consists of ultra-high vacuum (UHV) compatible eight modules and eight sectors. Rectangular baking channels are embedded on each of them. Similarly, the SST-1 plasma facing components (PFC) are comprised of modular graphite diverters and movable graphite based limiters. The nitrogen gas heating and supply system would bake the plasma facing components at 350°C and the SST-1 vacuum vessel at 150°C over an extended duration so as to remove water vapour and other absorbed gases. An efficient PLC based baking facility has been developed and implemented for monitoring and control purposes. This paper presents functional and operational aspects of a SST-1 nitrogen gas heating and supply system. Some of the experimental results obtained during the baking of SST-1 vacuum modules and sectors are also presented here. (fusion engineering)

  14. Developing the Water Supply System for Travel to Mars

    Science.gov (United States)

    Jones, Harry W.; Fisher, John W.; Delzeit, Lance D.; Flynn, Michael T.; Kliss, Mark H.

    2016-01-01

    What water supply method should be used on a trip to Mars? Two alternate approaches are using fuel cell and stored water, as was done for short missions such as Apollo and the Space Shuttle, or recycling most of the water, as on long missions including the International Space Station (ISS). Stored water is inexpensive for brief missions but its launch mass and cost become very large for long missions. Recycling systems have much lower total mass and cost for long missions, but they have high development cost and are more expensive to operate than storage. A Mars transit mission would have an intermediate duration of about 450 days out and back. Since Mars transit is about ten times longer than a brief mission but probably less than one-tenth as long as ISS, it is not clear if stored or recycled water would be best. Recycling system design is complicated because water is used for different purposes, drinking, food preparation, washing, and flushing the urinal, and because wastewater has different forms, humidity condensate, dirty wash water, and urine and flush water. The uses have different requirements and the wastewater resources have different contaminants and processing requirements. The most cost-effective water supply system may recycle some wastewater sources and also provide safety reserve water from storage. Different water supply technologies are compared using mass, cost, reliability, and other factors.

  15. Calibration of Water Supply Systems Based on Ant Colony Optimization

    Directory of Open Access Journals (Sweden)

    Mahmoud Faghfoor Maghrebi

    2013-03-01

    Full Text Available Leakage is one of the main problems in the water supply systems and due to the limitations in water supply and its costly process, reduction of leak in water distribution networks can be considered as one of the main goals of the water supply authorities. One of the leak detection techniques in water distribution system is the usage of the recorded node pressures at some locations to calibrate the whole system node pressures. Calibration process is accomplished by the optimization of a constrained objective function. Therefore, in addition to performing a hydraulic analysis of the network, application of an optimization technique is needed. In the current paper, a comparsion between the ant colony and genetic algorithm methodes, in calibration of the node pressures and leak detections was investigated. To examine the workability and the way of leak detection, analysis of the network with an assumed leak was carried out. The results showed that the effectiveness of the ant colony optimization in the detection of the position and magnitude of leak in a water network.

  16. Thermodynamic analysis of the efficiency of high-temperature steam electrolysis system for hydrogen production

    Science.gov (United States)

    Mingyi, Liu; Bo, Yu; Jingming, Xu; Jing, Chen

    High-temperature steam electrolysis (HTSE), a reversible process of solid oxide fuel cell (SOFC) in principle, is a promising method for highly efficient large-scale hydrogen production. In our study, the overall efficiency of the HTSE system was calculated through electrochemical and thermodynamic analysis. A thermodynamic model in regards to the efficiency of the HTSE system was established and the quantitative effects of three key parameters, electrical efficiency (η el), electrolysis efficiency (η es), and thermal efficiency (η th) on the overall efficiency (η overall) of the HTSE system were investigated. Results showed that the contribution of η el, η es, η th to the overall efficiency were about 70%, 22%, and 8%, respectively. As temperatures increased from 500 °C to 1000 °C, the effect of η el on η overall decreased gradually and the η es effect remained almost constant, while the η th effect increased gradually. The overall efficiency of the high-temperature gas-cooled reactor (HTGR) coupled with the HTSE system under different conditions was also calculated. With the increase of electrical, electrolysis, and thermal efficiency, the overall efficiencies were anticipated to increase from 33% to a maximum of 59% at 1000 °C, which is over two times higher than that of the conventional alkaline water electrolysis.

  17. Expert system for eddy current signal analysis: non destructive testing of steam generator tubings

    International Nuclear Information System (INIS)

    Benoist, B.

    1991-01-01

    Automatic analysis, by computer, of defect signals in steam generator tubes, based on Eddy current multifrequency technique, is must often inefficient due to pilgrim noise. The first step is to use a method that allows us to eleminate the noise: the adaptative interpolation. Thanks to this method, which ensures reliable data on each channel, the analysis can be realised by taking into account the data corresponding to each basic or mixed channel. By correlating these diverse data, we can class the signals according to two types of defects: single defects (symmetrical), multiple defects (several in the same place). The second step is to use an expert system which allows a reliable diagnosis for whatever family the defect belongs to. According to this classification, analysis is continued and results in the characterization of the defect. The expert system has already been developed with the general purpose application expert system shell SUPER, which is briefly described. The knowledge base (SOCRATE) and the specific tools developed for this application are thoroughly described. The first results obtained with signals corresponding to real defects, that have been recorded in different places, are presented and discussed. The expert system is revealed efficient in all the studied cases, even with signals obtained in very noisy environments [fr

  18. Steam purity in PWRs

    International Nuclear Information System (INIS)

    Hopkinson, J.

    1982-01-01

    Impurities enter the secondary loop of the PWR through both makeup water from lake or well and cooling-water leaks in the condenser. These impurities can be carried to the steam generator, where they cause corrosion deposits to form. Corrosion products in steam are swept further through the system and become concentrated at the point in the low-pressure turbine where steam begins to condense. Several plants have effectively reduced impurities, and therefore corrosion, by installing a demineralizer for the makeup water, a resin-bed system to clean condensed steam from the condenser, and a deaerator to remove oxygen from the water and so lower the risk of system metal oxidation. 5 references, 1 figure

  19. Development and application of the lancing system of delta-60 steam generator-Kori nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Jeong, W. T.; Han, D. Y.; Ahn, N. S.; Jo, B. H.; Hong, Y. W.

    2001-01-01

    A lancing system for removing the deposits on the tube sheet of a nuclear steam generator using high pressure water was developed and applied to Kori Nuclear Power Plant( NPP) Unit 1. As the place where the lancing system is to be installed is relatively high radioactive area, every part consisting the equipment is carefully selected to be radiation resistant. The lancing robot was designed to be water proof to aviod possible malfunction of the lancing robot because of high pressure water. To minimize radiation exposure to operators, the system was designed considering easy installation and maintenance in mind. Water ejection nozzle are designed to have high strength with special material and heat treatment so as to lessen abrasion caused by high pressure ejection. The lancing system showed good performance during the on-site lancing using the system for Delta-60 steam generator of Kori NPP No. 1 in October 2000

  20. Selling steam

    International Nuclear Information System (INIS)

    Zimmer, M.J.; Goodwin, L.M.

    1991-01-01

    This article addresses the importance of steam sales contract is in financing cogeneration facilities. The topics of the article include the Public Utility Regulatory Policies Act provisions and how they affect the marketing of steam from qualifying facilities, the independent power producers market shift, and qualifying facility's benefits

  1. Steam condenser

    International Nuclear Information System (INIS)

    Masuda, Fujio

    1980-01-01

    Purpose: To enable safe steam condensation by providing steam condensation blades at the end of a pipe. Constitution: When high temperature high pressure steam flows into a vent pipe having an opening under water in a pool or an exhaust pipe or the like for a main steam eacape safety valve, non-condensable gas filled beforehand in the steam exhaust pipe is compressed, and discharged into the water in the pool. The non-condensable gas thus discharged from the steam exhaust pipe is introduced into the interior of the hollow steam condensing blades, is then suitably expanded, and thereafter exhausted from a number of exhaust holes into the water in the pool. In this manner, the non-condensable gas thus discharged is not directly introduced into the water in the pool, but is suitable expanded in the space of the steam condensing blades to suppress extreme over-compression and over-expansion of the gas so as to prevent unstable pressure vibration. (Yoshihara, H.)

  2. Reason behind wet pack after steam sterilization and its consequences: An overview from Central Sterile Supply Department of a cancer center in eastern India.

    Science.gov (United States)

    Basu, Debabrata

    Wet pack after steam sterilization process that means there are surely obtain millions of microorganisms that can breed and multiply rapidly and objects are unsterile and can never be used for further procedure. There are many reasons behind the wet pack occurrences after autoclaving like poor quality of wrapping materials, faulty valves of rigid container, faulty loading and packaging technique, poor steam quality, sterilizer malfunction and may be design related problems in CSSD sterile storage area. Cause of wet pack after steam sterilization processes may occur severe problems because of wasted time and effort, increased work load, increased cost, potentially contaminated instruments, infection risk to the patient, poor patient outcomes and delayed or cancellation of procedures. But such wet pack scenario can be avoided by various methods by using good steam (water) quality, performing periodic maintenance of the Autoclaves, avoidance of sterilizer overloading, allowing adequate post sterilization time to cool down the materials to room temperature, using good quality wrapping materials, properly maintain temperature and humidity of sterile storage area etc. Copyright © 2016 King Saud Bin Abdulaziz University for Health Sciences. Published by Elsevier Ltd. All rights reserved.

  3. Field test of two high-pressure direct-contact downhole steam generators. Volume II. Oxygen/diesel system

    Energy Technology Data Exchange (ETDEWEB)

    Moreno, J.B.

    1983-07-01

    A field test of an oxygen/diesel fuel, direct contact steam generator has been completed. The field test, which was a part of Project DEEP STEAM and was sponsored by the US Department of Energy, involved the thermal stimulation of a well pattern in the Tar Zone of the Wilmington Oil Field. The activity was carried out in cooperation with the City of Long Beach and the Long Beach Oil Development Company. The steam generator was operated at ground level, with the steam and combustion products delivered to the reservoir through 2022 feet of calcium-silicate insulated tubing. The objectives of the test included demonstrations of safety, operational ease, reliability and lifetime; investigations of reservoir response, environmental impact, and economics; and comparison of those points with a second generator that used air rather than oxygen. The test was extensively instrumented to provide the required data. Excluding interruptions not attributable to the oxygen/diesel system, steam was injected 78% of the time. System lifetime was limited by the combustor, which required some parts replacement every 2 to 3 weeks. For the conditions of this particular test, the use of trucked-in LOX resulted in liess expense than did the production of the equivalent amount of high pressure air using on site compressors. No statistically significant production change in the eight-acre oxygen system well pattern occurred during the test, nor were any adverse effects on the reservoir character detected. Gas analyses during the field test showed very low levels of SOX (less than or equal to 1 ppM) in the generator gaseous effluent. The SOX and NOX data did not permit any conclusion to be drawn regarding reservoir scrubbing. Appreciable levels of CO (less than or equal to 5%) were measured at the generator, and in this case produced-gas analyses showed evidence of significant gas scrubbing. 64 figures, 10 tables.

  4. Optimal supply and demand investments in municipal energy systems

    International Nuclear Information System (INIS)

    Rolfsman, Bjoern

    2004-01-01

    In many municipalities, there are district heating networks, which are quite commonly supplied by combined heat and power plants (CHP). A district heating network contains buildings of different types. In this paper, one such municipal energy system is analysed. In order to provide space heating and domestic hot water, investments could be made on the supply side in power plants, or on the demand side in the buildings, for example in the form of extra wall insulation. The electricity from the CHP plants is supplied to the municipality but can also be sold to the electricity market, and electricity can, of course, also be bought from the market. The variation in price on the spot market over any given day is significant. The need for district heat in the building stock also varies, for example due to climatic conditions. The energy system in the case study is analysed with a mixed integer linear programming model. The model has 3 h time steps in order to reflect diurnal variations, and an entire year is analysed. A case study is presented for the city of Linkoeping in Sweden. On the demand side, the options are: extra wall insulation, extra attic insulation and better types of windows. The building stock is divided into nine categories

  5. Soviet steam generator technology: fossil fuel and nuclear power plants

    International Nuclear Information System (INIS)

    Rosengaus, J.

    1987-01-01

    In the Soviet Union, particular operational requirements, coupled with a centralized planning system adopted in the 1920s, have led to a current technology which differs in significant ways from its counterparts elsewhere in the would and particularly in the United States. However, the monograph has a broader value in that it traces the development of steam generators in response to the industrial requirements of a major nation dealing with the global energy situation. Specifically, it shows how Soviet steam generator technology evolved as a result of changing industrial requirements, fuel availability, and national fuel utilization policy. The monograph begins with a brief technical introduction focusing on steam-turbine power plants, and includes a discussion of the Soviet Union's regional power supply (GRES) networks and heat and power plant (TETs) systems. TETs may be described as large central co-generating stations which, in addition to electricity, provide heat in the form of steam and hot water. Plants of this type are a common feature of the USSR today. The adoption of these cogeneration units as a matter of national policy has had a central influence on Soviet steam generator technology which can be traced throughout the monograph. The six chapters contain: a short history of steam generators in the USSR; steam generator design and manufacture in the USSR; boiler and furnace assemblies for fossil fuel-fired power stations; auxiliary components; steam generators in nuclear power plants; and the current status of the Soviet steam generator industry. Chapters have been abstracted separately. A glossary is included containing abbreviations and acronyms of USSR organizations. 26 references

  6. Using integrated information systems in supply chain management

    Science.gov (United States)

    Gonzálvez-Gallego, Nicolás; Molina-Castillo, Francisco-Jose; Soto-Acosta, Pedro; Varajao, Joao; Trigo, Antonio

    2015-02-01

    The aim of this paper is to empirically test not only the direct effects of information and communication technology (ICT) capabilities and integrated information systems (IS) on firm performance, but also the moderating role of IS integration along the supply chain in the relationship between ICT external and capabilities and business performance. Data collected from 102 large Iberian firms from Spain and Portugal are used to test the research model. The hierarchical multiple regression analysis is employed to test the direct effects and the moderating relationships proposed. Results show that external and internal ICT capabilities are important drivers of firm performance, while merely having integrated IS do not lead to better firm performance. In addition, a moderating effect of IS integration in the relationship between ICT capabilities and business performance is found, although this integration only contributes to firm performance when it is directed to connect with suppliers or customers rather than when integrating the whole supply chain.

  7. Alternative power supply systems for remote industrial customers

    Science.gov (United States)

    Kharlamova, N. V.; Khalyasmaa, A. I.; Eroshenko, S. A.

    2017-06-01

    The paper addresses the problem of alternative power supply of remote industrial clusters with renewable electric energy generation. As a result of different technologies comparison, consideration is given to wind energy application. The authors present a methodology of mean expected wind generation output calculation, based on Weibull distribution, which provides an effective express-tool for preliminary assessment of required installed generation capacity. The case study is based on real data including database of meteorological information, relief characteristics, power system topology etc. Wind generation feasibility estimation for a specific territory is followed by power flow calculations using Monte Carlo methodology. Finally, the paper provides a set of recommendations to ensure safe and reliable power supply for the final customers and, subsequently, to provide sustainable development of the regions, located far from megalopolises and industrial centres.

  8. Technical study of real-time simulation system for digital I and C system of steam generator in nuclear power plant

    International Nuclear Information System (INIS)

    Shi Ji; Jiang Mingyu; Ma Yunqin

    2004-01-01

    The real-time simulation system, which forms a interactive closed circle together with the steam generator control system, has been developed using a dynamic mathematical model of steam generator in this paper. It can provide a simulation target for upgrades of digital Instrument and Control system in Nuclear Power Plant (NPP) and is applicable for further research of control schemes. With this program, the authors have studied and analyzed the response of transient parameters to some different disturbance, the calculated results are in good agreement with those calculated by NPP simulator program. This will give a theoretical analysis for upgrades of digital I and C system in nuclear power plant

  9. Development of Solar Electricity Supply System in India: An Overview

    Directory of Open Access Journals (Sweden)

    Sandeep Kumar Gupta

    2013-01-01

    Full Text Available Solar electricity supply system has grown at very rapid pace in India during the last few years. A total of 1047.84 MW of grid connected photovoltaic projects and 160.8 MW of off-grid systems have been commissioned under different policy mechanisms between January 2010 and November 2012. It is observed that solar capacity development has achieved a greater height under state policies (689.81 MW than others. A study is made in this paper of various national and state level schemes, incentives, packages, instruments, and different mechanisms to promote solar photovoltaics and its effectiveness.

  10. Study of ex-vessel steam explosion risk of Reactor Pit Flooding System and structural response of containment for CPR1000"+ Unit

    International Nuclear Information System (INIS)

    Zhang Juanhua; Chen Peng

    2015-01-01

    Reactor Pit Flooding System is one of the special mitigation measures for severe accident for CPR1000"+ Unit. If the In-Vessel Relocation function of Reactor Pit Flooding System is failed, there is the steam explosion risk in reactor cavity. This paper firstly adopts MC3D code to build steam explosion model in order to calculate the pressure load and impulses of steam explosion that are as the input data of containment structural response analysis. The next step is to model the containment structure and analyze the structural response by ABAQUS code. The analysis results show that the integral damage induced by steam explosion to the external containment wall is shallow, and the containment structural integrity can be maintained. The risk and damage to the containment integrity reduced by steam explosion of RPF is small, and it does not influence the design and implementation of RPF. (author)

  11. Studying the processes of sodium-water interaction in the BOR-60 reactor micromodule steam generator

    International Nuclear Information System (INIS)

    Tsykanov, V.A.; Antipin, G.K.; Borisov, V.V.

    1981-01-01

    Main results of experimental studies of emergency regimes of micromodule steam generator (MSG) at small and big leaks of water into sodium, realized using the 30 MW MSG, operating in the BOR-o0 reactor, are considered. The aims of the study are as follows: the modelling of macroleak in ''Nadja'' steam generator for the BN-350 reactor; testing the conceptions of alarm signalling and MSG protection; testing under real conditions of new perspective systems of leak detection; gaining the experimence and development of the ways to eliminate the consequences of accident caused by big water leak into sodium; accumulation of knowledge on restoration of MSG operating ability after accident; experimental test of calculational techniques for big leak accidents to use them in future for calculational studies of similar situations at other reactors equipped with sodium-water steam generators; refinement of characteristics of hydrodynamic and thermal effects interaction zone for big leak in real circuit during the plant operation. A series of experiments with the imitation of water leak into sodium by means of argon and steam supply through injection devices, located before the steam superheater module of one of the sections and between evaporator module of the same section, is conducted. The range of steam flow rate is 0.02-0.45 g/s. Duration of steam supply is 100-400 s. A conclusion is made that the results obtained can be used for steam generator of the BN-350 reactor [ru

  12. Accurate calibration of steam turbine speed control system and its influence on primary regulation at electric grid

    Energy Technology Data Exchange (ETDEWEB)

    Irrazabal Bohorquez, Washington Orlando; Barbosa, Joao Roberto [Technological Institute of Aeronautics (ITA/CTA), Sao Jose dos Campos, SP (Brazil). Center for Reference on Gas Turbine and Energy], E-mail: barbosa@ita.br

    2010-07-01

    In an interconnected electric system there are two very important parameters: the field voltage and the frequency system. The frequency system is very important for the primary regulation of the electric grid. Each turbomachine actuating as generator interconnected to the grid has an automatic speed regulator to keep the rotational speed and mechanical power of the prime machine operating at the set conditions and stable frequency. The electric grid is a dynamical system and in every moment the power units are exposed to several types of disturbances, which cause unbalance of the mechanical power developed by prime machine and the consumed electric power at the grid. The steam turbine speed control system controls the turbine speed to support the electric grid primary frequency at the same time it controls the frequency of the prime machine. Using a mathematical model for the speed control system, the transfer functions were calculated, as well as the proportionality constants of each element of the steam turbine automatic speed regulator. Among other parameters, the droop characteristic of steam turbine and the dynamic characteristics of the automatic speed regulator elements were calculated. Another important result was the determination of the behavior of the speed control when disturbances occur with the improvement of the calibration precision of the control system. (author)

  13. Design and construction of a steam generator with feedback; Projeto e construcao de um gerador de vapor com realimentacao

    Energy Technology Data Exchange (ETDEWEB)

    Camargo, Camila C., E-mail: camilacamargo@outlook.com [Universidade Federal de Sao Paulo (UNIFESP), Sao Jose dos Campos, SP (Brazil); Placco, Guilherme M., E-mail: placco@ieav.cta.br [Instituto de Tecnologia Aeronautica (ITA/CTA), Sao Jose dos Campos, SP (Brazil); Guimaraes, Lamartine N.F., E-mail: guimarae@ieav.cta.br [Instituto de Estudos Avancado (IEAv/DCTA), Sao Jose dos Campos, SP (Brazil). Departamento ENU

    2013-07-01

    The EARTH project aims to develop technologies to design and build systems that generate electricity in space, using microreactors. One of the activities within the TERRA project aims to build a closed thermal cycle Rankine type in order to test a Tesla turbine type. The objective of this work is to design and build a steam generator with feedback, which should ensure a satisfactory range of steam supply, security system, feedback system and heating system.

  14. On synthesis and optimization of steam system networks. 1. Sustained boiler efficiency

    CSIR Research Space (South Africa)

    Majozi, T

    2010-08-01

    Full Text Available situations. This paper presents a process integration technique for network synthesis using conceptual and mathematical analysis without compromising boiler efficiency. It was found that the steam flow rate to the HEN could be reduced while maintaining boiler...

  15. Moderate glucose supply reduces hemolysis during systemic inflammation

    Directory of Open Access Journals (Sweden)

    Jägers J

    2018-03-01

    Full Text Available Johannes Jägers,1 Stephan Brauckmann,2 Michael Kirsch,1 Katharina Effenberger-Neidnicht1,3 1Institute of Physiological Chemistry, University Hospital Essen, Essen, Germany; 2Clinic for Anesthesiology and Intensive Care, University Hospital Essen, Essen, Germany; 3Institute of Physiological Chemistry, University Hospital Essen, Essen, Germany Background: Systemic inflammation alters energy metabolism. A sufficient glucose level, however, is most important for erythrocytes, since erythrocytes rely on glucose as sole source of energy. Damage to erythrocytes leads to hemolysis. Both disorders of glucose metabolism and hemolysis are associated with an increased risk of death. The objective of the study was to investigate the impact of intravenous glucose on hemolysis during systemic inflammation.Materials and methods: Systemic inflammation was accomplished in male Wistar rats by continuous lipopolysaccharide (LPS infusion (1 mg LPS/kg and h, 300 min. Sham control group rats received Ringer’s solution. Glucose was supplied moderately (70 mg glucose/kg and h or excessively (210 mg glucose/kg and h during systemic inflammation. Vital parameters (eg, systemic blood pressure as well as blood and plasma parameters (eg, concentrations of glucose, lactate and cell-free hemoglobin, and activity of lactate dehydrogenase were measured hourly. Clot formation was analyzed by thromboelastometry.Results: Continuous infusion of LPS led to a so-called post-aggression syndrome with disturbed electrolyte homeostasis (hypocalcemia, hyperkalemia, and hypernatremia, changes in hemodynamics (tachycardia and hypertension, and a catabolic metabolism (early hyperglycemia, late hypoglycemia, and lactate formation. It induced severe tissue injury (significant increases in plasma concentrations of transaminases and lactate dehydrogenase, alterations in blood coagulation (disturbed clot formation, and massive hemolysis. Both moderate and excessive glucose supply reduced LPS

  16. Design of helium-gas supplying facility of out-of-pile demonstration test for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Hino, Ryutaro; Fujisaki, Katsuo; Kobayashi, Toshiaki [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    1996-09-01

    One of the objectives of the High-Temperature Engineering Test Reactor (HTTR) is to demonstrate effectiveness of high-temperature heat utilization. Prior to connect a heat utilization system to the HTTR, a series of out-of-pile demonstration test is indispensable to improve components` performance, to demonstrate operation, control and safety technologies and to verify analysis codes for design and safety evaluation. After critical review and discussion on the out-of-pile demonstration test, a test facility have been designed. In this report, a helium-gas supplying facility simulated the HTTR system was described in detail, which supplies High-temperature helium-gas of 900degC to a steam reforming facility mocking-up the HTTR heat utilization system. Components of the Helium Engineering Demonstration Loop (HENDEL) were selected to reuse in the helium-gas supplying facility in order to decrease construction cost. Structures and specifications of new components such as a high-temperature heater and a preheater were decided after evaluation of thermal and hydraulic performance and strength. (author)

  17. Steam System Balancing and Tuning for Multifamily Residential Buildings in Chicagoland - Second Year of Data Collection

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Jayne [Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Ludwig, Peter [Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Brand, Larry [Partnership for Advanced Residential Retrofit, Chicago, IL (United States)

    2013-08-01

    Steam heated buildings often suffer from uneven heating as a result of poor control of the amount of steam entering each radiator. In order to satisfy the heating load to the coldest units, other units are overheated. As a result, some tenants complain of being too hot and open their windows in the middle of winter, while others complain of being too cold and are compelled to use supplemental heat sources.

  18. Steam generator tube failures

    International Nuclear Information System (INIS)

    MacDonald, P.E.; Shah, V.N.; Ward, L.W.; Ellison, P.G.

    1996-04-01

    A review and summary of the available information on steam generator tubing failures and the impact of these failures on plant safety is presented. The following topics are covered: pressurized water reactor (PWR), Canadian deuterium uranium (CANDU) reactor, and Russian water moderated, water cooled energy reactor (VVER) steam generator degradation, PWR steam generator tube ruptures, the thermal-hydraulic response of a PWR plant with a faulted steam generator, the risk significance of steam generator tube rupture accidents, tubing inspection requirements and fitness-for-service criteria in various countries, and defect detection reliability and sizing accuracy. A significant number of steam generator tubes are defective and are removed from service or repaired each year. This wide spread damage has been caused by many diverse degradation mechanisms, some of which are difficult to detect and predict. In addition, spontaneous tube ruptures have occurred at the rate of about one every 2 years over the last 20 years, and incipient tube ruptures (tube failures usually identified with leak detection monitors just before rupture) have been occurring at the rate of about one per year. These ruptures have caused complex plant transients which have not always been easy for the reactor operators to control. Our analysis shows that if more than 15 tubes rupture during a main steam line break, the system response could lead to core melting. Although spontaneous and induced steam generator tube ruptures are small contributors to the total core damage frequency calculated in probabilistic risk assessments, they are risk significant because the radionuclides are likely to bypass the reactor containment building. The frequency of steam generator tube ruptures can be significantly reduced through appropriate and timely inspections and repairs or removal from service

  19. Power supply for wireless sensor or actuator systems

    International Nuclear Information System (INIS)

    Reindl, L. M.

    2011-01-01

    Portable wireless sensor or actuator systems, like portable phones, remote control, or ID cards play an ever growing role in our industrialized environment. Those systems and many more were enabled due to the steady decreasing power consumption of high integrated ICs. Most such systems are powered by batteries or inductive coupling. In this presentation several concepts for an alternative power supply of wireless sensor or actuator systems are discussed in detail. Batteries, although today mostly used, suffer from a limited storage capacity, which induce a labour and sometimes cost-intensive periodic maintenance, and a problematic ecological impact. The operating range of inductive coupling systems is due to the near ?eld limited to the aperture of the coupling coil. UHF systems operate in the far field and reach higher distances. Their operating range is limited by the distance where the voltage at the feeding point of the antenna becomes too low to drive the rectifier circuit. Larger read out ranges become feasible by omitting the rectifier stage. In this case we need either a passive frequency modulating device to shift the read out signal to a side band, or a resonator with a high quality factor, like a SAW or BAW device, to store the energy until all environmental echoes are feed away. For many applications, both indoor and outdoor, energy harvesting system become feasible which convert ambient power densities like light, RF fields, special or temporal thermal gradients, or mechanical vibrations into electrical supply power of the wireless system. All those systems strongly suffer from a lack of energy. Thus new concepts for low-ering the power consumption of a wireless sensor or actuator system by keeping their features remain extreme important. Herby, a new wake up receiver is presented which operates on a current requirement as low as 3 micro A.

  20. The impact of steam generator replacement on PWR primary system contamination

    International Nuclear Information System (INIS)

    Dacquait, F.; Marteau, H.; Guinard, L.; Ranchoux, G.; Taunier, S.; Wintergerst, M.; Bretelle, J.L.; Rocher, A.

    2010-01-01

    This paper analyses the impact of Steam Generator Replacement (SGR) on PWR primary circuit contamination. It presents a comparison of the activities deposited inside the primary system and released during refuelling outages after SGR with three different SG tube alloys (600, 690 and 800) and different SG tube manufacturing processes. A SGR has a great impact on the primary system contamination. After SGR, whatever the SG tube material is, the typical variations are the following: The 58 Co contamination increases for 1 to 3 cycles, and then decreases to very low levels in some cases, mainly depending on the manufacturing process of the replacement SG tubes; The 60 Co Co contamination tends to decrease on the primary coolant pipes and increases by a lower rate on the new SG tubes. This analysis highlights the importance on contamination levels after SGR of both the corrosion product deposits on the primary surfaces before SGR and the surface finish of the SG tubes related to their manufacturing process. (author)

  1. An evaluation of designed Start-up System (SUS) for once-through steam generators

    International Nuclear Information System (INIS)

    Yu, Dali; Peng, Minjun; Xia, Genglei; Mao, Wanchao; Yang, Yang

    2014-01-01

    Highlights: • Four SUS solutions are established to help reactors complete the start-up process. • Solutions C and D lead to superior behaved than Solutions A and B. • Solution C is fit for propulsion reactors and Solution D for nuclear power reactors. - Abstract: In this paper, we report on research that has been carried out both on the comparison and evaluation of four designed Start-up Systems (SUSs), which are proposed to improve reliability and economy during the reactor start-up process. Firstly, four SUS solutions are established to satisfy demands and detailed descriptions are introduced. Then, four reactor systems, which include SUS, are modeled by the estimate code JTopmeret. Furthermore besides, the JTopmeret code is validated for the once-through steam generators (OTSG). Finally, the behaviors of SUS and the steady and transient performance of OTSG are investigated. The results show that the designed SUS can successfully improve the economy and the OTSG operational safety. Suggestion is made in this paper to apply Solution C in propulsion-purposed reactors, and Solution D in nuclear power reactors

  2. Systems Analysis of a Fast Steam-Cooled Reactor of 1000 MW(E)

    Energy Technology Data Exchange (ETDEWEB)

    Smidt, D.; Frisch, W.; Hofmann, F.; Moers, H.; Schramm, K.; Spilker, H. [Institut fuer Reaktorentwicklung, Kernforschungszentrum, Karlsruhe, Karlsruhe, Federal Republic of Germany (Germany); Kiefhaber, E. [Institut fuer Neutronenphysik und Reaktortechnik Kernforschungszentrum Karlsruhe, Karlsruhe, Federal Republic of Germany (Germany)

    1968-05-15

    The Karlsruhe design of a steam-cooled fast reactor (Dl) has been the subject of a systems analysis. Here the dependence of fuel inventory, breeding ratio, rating, core geometry and plant efficiency on coolant pressure, and coolant temperature has been studied for two different rod powers. The effect of artificial surface roughness has been investigated. For some configurations the resulting fuel-cycle and capital costs have been determined and discussed. The main influence results from pressure. The lower pressure allows for higher breeding ratios, but lower efficiencies and vice versa. From this the fuel-cycle costs show an optimum at around 150 atm abs. The capital costs on the other side decrease with pressure. The over-all optimum of the power generating costs for the presently studied parameter range is at about 170 atm abs., a coolant outlet temperature of 540 Degree-Sign C and a rod power of 420 W/cm. Artificial roughness (boundary layer type) leads for a required system pressure and outlet temperature to a larger coolant volume fraction and, therefore, to reduced breeding ratios but higher efficiencies. As another part of the work some stability characteristics of the cores were studied. The dependence of the core stability on the varied parameters is shown. (author)

  3. Calculation of fluid (steam) hammer loading to piping systems by the response spectrum method

    International Nuclear Information System (INIS)

    Krause, G.; Schrader, W.; Leimbach, K.R.

    1983-01-01

    Today computations of fluid and steam hammer loading to piping systems are usually performed as a time-history analysis in which the transient pressure forces act as external excitations. For practical purposes it is desirable to be able to treat fluid hammer loading using the response spectrum method similarily as loads from external events. Two advantages arise from the use of spectra in the analysis of piping systems subjected to dynamic force excitations. Firstly, the response spectrum method is much less sensitive to model idealization than the time-history method. Secondly, computational efforts are reduced. In this paper the algorithm for the treatment of force excitations through the modal response spectrum method is briefly presented. The effect of the residuum accounting for higher modes which are not part of the modal decomposition is considered. In particular various methods of superposition of the responses of the dynamic forces and of the modes are investigated. Results and comparisons are presented of several response spectrum analyses and time-history analyses. (orig.)

  4. A study on development of a rule based expert system for steam generator life extension

    International Nuclear Information System (INIS)

    Park, Jin Kyun

    1994-02-01

    The need of predicting the integrity of the steam generator(SG) tubes and environmental conditions that affect their integrity is growing to secure nuclear power plant(NPP) safety and enhance plant availability. To achieve their objectives it is important to diagnose the integrity of the SG tubes. An expert system called FEMODES(failure mode diagnosis expert system) has been developed for diagnosis of such tube degradation phenomena as denting, intergranular attack(IGA) and stress corrosion cracking(SCC) in the secondary side of the SG. It is possible with use of FEMODES to estimate possibilities of SG tube degradation and diagnosis environmental conditions that influence such tube degradation. The method of certainty factor theory(CFT) and the rule based backward reasoning inference strategy are used to develop FEMODES. The information required for diagnosis is acquired from SG tube degradation experiences of two local reference plants, some limited oversea plants and technical reports/research papers about such tube degradation. Overall results estimated with use of FEMODES are in reasonable agreement with actual SG tube degradation. Some discrepancy observed in several estimated values of SG tube degradation appears to be due to insufficient heuristic knowledge for knowledge data base of FEMODES

  5. Constraints on silicates formation in the Si-Al-Fe system: Application to hard deposits in steam generators of PWR nuclear reactors

    Science.gov (United States)

    Berger, Gilles; Million-Picallion, Lisa; Lefevre, Grégory; Delaunay, Sophie

    2015-04-01

    Introduction: The hydrothermal crystallization of silicates phases in the Si-Al-Fe system may lead to industrial constraints that can be encountered in the nuclear industry in at least two contexts: the geological repository for nuclear wastes and the formation of hard sludges in the steam generator of the PWR nuclear plants. In the first situation, the chemical reactions between the Fe-canister and the surrounding clays have been extensively studied in laboratory [1-7] and pilot experiments [8]. These studies demonstrated that the high reactivity of metallic iron leads to the formation of Fe-silicates, berthierine like, in a wide range of temperature. By contrast, the formation of deposits in the steam generators of PWR plants, called hard sludges, is a newer and less studied issue which can affect the reactor performance. Experiments: We present here a preliminary set of experiments reproducing the formation of hard sludges under conditions representative of the steam generator of PWR power plant: 275°C, diluted solutions maintained at low potential by hydrazine addition and at alkaline pH by low concentrations of amines and ammoniac. Magnetite, a corrosion by-product of the secondary circuit, is the source of iron while aqueous Si and Al, the major impurities in this system, are supplied either as trace elements in the circulating solution or by addition of amorphous silica and alumina when considering confined zones. The fluid chemistry is monitored by sampling aliquots of the solution. Eh and pH are continuously measured by hydrothermal Cormet© electrodes implanted in a titanium hydrothermal reactor. The transformation, or not, of the solid fraction was examined post-mortem. These experiments evidenced the role of Al colloids as precursor of cements composed of kaolinite and boehmite, and the passivation of amorphous silica (becoming unreactive) likely by sorption of aqueous iron. But no Fe-bearing was formed by contrast to many published studies on the Fe

  6. Reliability of steam-turbine rotors. Task 1. Lifetime prediction analysis system. Final report

    International Nuclear Information System (INIS)

    Nair, P.K.; Pennick, H.G.; Peters, J.E.; Wells, C.H.

    1982-12-01

    Task 1 of RP 502, Reliability of Steam Turbine Rotors, resulted in the development of a computerized lifetime prediction analysis system (STRAP) for the automatic evaluation of rotor integrity based upon the results of a boresonic examination of near-bore defects. Concurrently an advanced boresonic examination system (TREES), designed to acquire data automatically for lifetime analysis, was developed and delivered to the maintenance shop of a major utility. This system and a semi-automated, state-of-the-art system (BUCS) were evaluated on two retired rotors as part of the Task 2 effort. A modified nonproprietary version of STRAP, called SAFER, is now available for rotor lifetime prediction analysis. STRAP and SAFER share a common fracture analysis postprocessor for rapid evaluation of either conventional boresonic amplitude data or TREES cell data. The final version of this postprocessor contains general stress intensity correlations for elliptical cracks in a radial stress gradient and provision for elastic-plastic instability of the ligament between an imbedded crack and the bore surface. Both linear elastic and ligament rupture models were developed for rapid analysis of linkup within three-dimensional clusters of defects. Bore stress-rupture criteria are included, but a creep-fatigue crack growth data base is not available. Physical and mechanical properties of air-melt 1CrMoV forgings are built into the program; however, only bounding values of fracture toughness versus temperature are available. Owing to the lack of data regarding the probability of flaw detection for the boresonic systems and of quantitative verification of the flaw linkup analysis, automatic evlauation of boresonic results is not recommended, and the lifetime prediction system is currently restricted to conservative, deterministic analysis of specified flaw geometries

  7. Advanced power supply and distribution systems for Columbus

    Science.gov (United States)

    Eggers, Gert

    1988-01-01

    The paper describes power supply and distribution systems to be used on unmanned/man-tended Columbus elements, capable of supplying 10 kW to 30 kW to a variety of users in low earth orbits (LEO's). For the definition of the Electrical Power System (EPS) challenging requirements as the provision of high power levels under hard LEO conditions, maintainability, commonality etc. are to be taken into account. These requirements are to be seen in conjunction with the Columbus IOC (initial operational capability) scenario stipulating that EPS hardware shall be used on the Polar Platform, the Pressurized Module attached to the U.S. Space Station and the Man-Tended Free Flier. According to the availability of European technologies, the baseline in the power generation area is a photovoltaic system which provides three regulated main buses (150 V d.c.) to the users. In order to maintain power supply during eclipse phases, nickel hydrogen batteries will be used for energy storage purposes with nickel cadmium as back-up solution. The power distribution system needs special attention. Due to the elevated voltage levels mechanical switch gear cannot be used any longer. It is to be replaced by solid state power controllers (SSPC). Because these devices show a totally different behaviour with regard to conventional relay contacts, new approaches in the area of switching and protection are necessary. In view of the crucial role of this new technology for the realization of medium voltage d.c. systems, it is of great importance for Columbus and, hence will receive adequate consideration in the paper. In order to cater for effective management and control of the power supply and distribution hardware, a so called power system internal data processing assembly (PINDAP) has been introduced in the EPS. PINDAP is the key to reduced dependence on ground stations (alleviated ground support requirements); it keeps crew involvement in the EPS control process to as minimum and provides

  8. In-service diagnostic systems of steam generators, pressurizers and other components of WWER type nuclear power plants

    International Nuclear Information System (INIS)

    Matal, O.

    1988-01-01

    A detailed description is presented of the systems of vibration inspections and systems of determining residual service life, implemented as in-service diagnostic systems for steam generators and pressurizers at the Dukovany nuclear power plant. Low temperature accelerometers of the KD or KS type and high temperature accelerometers CA 91 are used as vibration sensors. In the system of vibration inspection a total of 64 vibration measuring chains of Czechoslovak make and design are installed in the power plant. Systems are being built for determining residual service life which consist of 75 special chains for heat monitoring with thermocouples installed on selected assemblies of the steam generators and the pressurizers serving to monitor and evaluate heat stress. Also included in the system for determining residual service life are 16 routes for water withdrawal from steam generators. Their purpose is to make in-service determinations of places of biggest concentrations of impurities in secondary water, to determine the biggest local chemical exposure of primary collector and heat exchange tube materials and to optimize the size and place of leachate withdrawal. (Z.M.). 2 figs., 2 tabs., 15 refs

  9. Facility to separate water and steam

    International Nuclear Information System (INIS)

    Loesel, G.

    1977-01-01

    The water/steam mixture from the pressure vessel e.g. of a BWR is separated by means of centrifugal separators untilizing the natural separation of steam. The steam is supplied to a steam drying vessel and the water to a water collecting tank. These vessels may be combined to a common vessel or connected through additional pipes. From the water collecting tank, arranged below the steam dryer, a feedwater pipe runs back to the pressure vessel. By construction out of individual components cleaning, decontamination, and operating control are essentially simplified. (RW) 891 RW [de

  10. Alignment of Information Systems with Supply Chains: Impacts on Supply Chain Performance and Organizational Performance

    Science.gov (United States)

    Qrunfleh, Sufian M.

    2010-01-01

    Over the past decade, an important focus of researchers has been on supply chain management (SCM), as many organizations believe that effective SCM is the key to building and sustaining competitive advantage for their products/services. To manage the supply chain, companies need to adopt an SCM strategy (SCMS) and implement appropriate SCM…

  11. Leaks in the internal water supply piping systems

    Directory of Open Access Journals (Sweden)

    Orlov Evgeniy Vladimirovich

    2015-03-01

    Full Text Available Great water losses in the internal plumbing of a building lead to the waste of money for a fence, purification and supply of water volumes in excess. This does not support the concept of water conservation and resource saving lying today in the basis of any building’s construction having plumbing. Leakage means unplanned of water losses systems in domestic water supply systems (hot or cold as a result of impaired integrity, complicating the operation of a system and leading to high costs of repair and equipment restoration. A large number of leaks occur in old buildings, where the regulatory service life of pipelines has come to an end, and the scheduled repair for some reason has not been conducted. Steel pipelines are used in the systems without any protection from corrosion and they get out of order. Leakages in new houses are also not uncommon. They usually occur as a result of low-quality adjustment of the system by workers. It also important to note the absence of certain skills of plumbers, who don’t conduct the inspections of in-house systems in time. Sometimes also the residents themselves forget to keep their pipeline systems and water fittings in their apartment in good condition. Plumbers are not systematically invited for preventive examinations to detect possible leaks in the domestic plumbing. The amount of unproductive losses increases while simultaneous use of valve tenants, and at the increase of the number of residents in the building. Water leaks in the system depend on the amount of water system piping damages, and damages of other elements, for example, water valves, connections, etc. The pressure in the leak area also plays an important role.

  12. Development of Technologies on Innovative-Simplified Nuclear Power Plant Using High-Efficiency Steam Injectors (12) Evaluations of Spatial Distributions of Flow and Heat Transfer in Steam Injector

    International Nuclear Information System (INIS)

    Yutaka Abe; Yujiro Kawamoto; Chikako Iwaki; Tadashi Narabayashi; Michitsugu Mori; Shuichi Ohmori

    2006-01-01

    Next-generation nuclear reactor systems have been under development aiming at simplified system and improvement of safety and credibility. One of the innovative technologies is the supersonic steam injector, which has been investigated as one of the most important component of the next-generation nuclear reactor. The steam injector has functions of a passive pump without large motor or turbo-machinery and a high efficiency heat exchanger. The performances of the supersonic steam injector as a pump and a heat exchanger are dependent on direct contact condensation phenomena between a supersonic steam and a sub-cooled water jet. In previous studies of the steam injector, there are studies about the operating characteristics of steam injector and about the direct contact condensation between static water pool and steam in atmosphere. However, there is a little study about the turbulent heat transfer and flow behavior under the great shear stress. In order to examine the heat transfer and flow behavior in supersonic steam injector, it is necessary to measure the spatial temperature distribution and velocity in detail. The present study, visible transparent supersonic steam injector is used to obtain the axial pressure distributions in the supersonic steam injector, as well as high speed visual observation of water jet and steam interface. The experiments are conducted with and without non-condensable gas. The experimental results of the interfacial flow behavior between steam and water jet are obtained. It is experimentally clarified that an entrainment exists on the water jet surface. It is also clarified that discharge pressure is depended on the steam supply pressure, the inlet water flow rate, the throat diameter and non-condensable flow rate. Finally a heat flux is estimated about 19 MW/m 2 without non-condensable gas condition in steam. (authors)

  13. Considerations on Risk in Supply Chain Management Information Systems Implementation

    Directory of Open Access Journals (Sweden)

    Valentin-Petru Măzăreanu

    2013-02-01

    Full Text Available Innovation in information and communication technologies resulted in the digital revolution. This kind of revolution is changing the way people work, learn, communicate and manage their businesses. Due to the need to achieve the competitive advantage and to meet the business requirements, we are witnessing an increasing shift from business to e-business and mobile business. In this kind of world solutions like Supply Chain Management (SCM are increasingly appearing. The business success depends on how effective the information system works. Any interruption of the information system will inevitably lead to business loss. To ensure the successful implementation of a SCM project it is necessary to study even from the early stages which are the possible actions / risks / obstacles which might damage in one way or another the execution of the project. The role of the literature and case studies review in the field of interest is undeniable because it provides us with access to the so-called lessons-learned. By using this approach, in this paper, we present the most common risks and risk sources encountered in the implementation projects of SCM type information systems. We also propose a risk identification framework that can be used in the early stages of the implementation project of a Supply Chain Management information system.

  14. Field test of two high-pressure, direct-contact downhole steam generators. Volume I. Air/diesel system

    Energy Technology Data Exchange (ETDEWEB)

    Marshall, B.W.

    1983-05-01

    As a part of the Project DEEP STEAM to develop technology to more efficiently utilize steam for the recovery of heavy oil from deep reservoirs, a field test of a downhole steam generator (DSG) was performed. The DSG burned No. 2 diesel fuel in air and was a direct-contact, high pressure device which mixed the steam with the combustion products and injected the resulting mixture directly into the oil reservoir. The objectives of the test program included demonstration of long-term operation of a DSG, development of operational methods, assessment of the effects of the steam/combustion gases on the reservoir and comparison of this air/diesel DSG with an adjacent oxygen/diesel direct contact generator. Downhole operation of the air/diesel DSG was started in June 1981 and was terminated in late February 1982. During this period two units were placed downhole with the first operating for about 20 days. It was removed, the support systems were slightly modified, and the second one was operated for 106 days. During this latter interval the generator operated for 70% of the time with surface air compressor problems the primary source of the down time. Thermal contact, as evidenced by a temperature increase in the production well casing gases, and an oil production increase were measured in one of the four wells in the air/diesel pattern. Reservoir scrubbing of carbon monoxide was observed, but no conclusive data on scrubbing of SO/sub x/ and NO/sub x/ were obtained. Corrosion of the DSG combustor walls and some other parts of the downhole package were noted. Metallurgical studies have been completed and recommendations made for other materials that are expected to better withstand the downhole combustion environment. 39 figures, 8 tables.

  15. Prospects for development of heat supply systems in high-rise districts

    Science.gov (United States)

    Zhila, Viktor; Solovyeva, Elena

    2018-03-01

    The article analyzes the main advantages and disadvantages of centralized and decentralized heat supply systems in high-rise districts. The main schemes of centralized heat supply systems are considered. They include centralized heat supply from boiler houses, centralized heat supply from autonomous heat sources, heat supply from roof boiler houses and door-to-door heating supply. For each of these variant, the gas distribution systems are considered and analyzed. These systems vary depending on the heat source location. For each of these systems, technical and economic indicators are taken into account, the analysis of which allows choosing the best option for districts where high-rise buildings predominate.

  16. Leak detection in Phenix and Super Phenix steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Cambillard, E [Centre d' Etudes Nucleaires de Saclay, Gif-sur-Yvette (France)

    1978-10-01

    Water leak detection Phenix and Super Phenix steam generators is based on measurement of the hydrogen produced by the reaction of sodium with water. The hydrogen evolves in the sodium in which the steam generator tubes are completely immersed. Depending on service conditions, however (sodium temperature and flow velocity), the hydrogen may appear in the argon existing above the free levels. This is why, although the Phenix steam generators do not feature free levels, measurement systems were added to measure the hydrogen concentration in the argon in the expansion tanks. Super Phenix steam generators are fitted at their outlet with systems for measuring hydrogen in the sodium, and above their free level with a system for measuring hydrogen in the argon. The measurement systems have nickel tube probes connected to circuits kept under vacuum by an ion pump. The hydrogen partial pressure is measured by a mass spectrometer. Super Phenix measurement systems differ from Phenix systems essentially in the temperature regulation of the sodium reaching the nickel tube probes, and in the centralization of the supply and measurement systems of the ion pumps and mass spectrometers. This paper deals with description, calibration and operating conditions of the hydrogen detection systems in sodium and argon in Phenix and Super Phenix steam generators. (author)

  17. To the choice of the regeneration system of the K-1000-68/1500 turbine plant for the NPP with a vertical-type steam generator

    International Nuclear Information System (INIS)

    Kuznetsov, N.M.; Piskarev, A.A.; Grinman, M.I.; Kruglikov, P.A.

    1985-01-01

    Several variants of the heat regeneration system for the NPP with WWER-1000 type reactors using vertical steam generator (SG) generating saturated steam at 7.2 MPa pressure and 200 deg C feed water temperature at the SG inlet are considered. The results of comparison of variants in water and steam circuits of turbine plants are greatly influenced by integral economy account, i.e. efficiency indexes account under variable conditions of power unit operation. From variants of water and steam circuits of the K-1000-68/1500 turbine plant considered preference is given to the variant with four low pressure heaters with increased up to 1.25 MPa pressure in a deacrator without high pressure heater with pumping intermediate steam superheater condensate into feedwater circuit

  18. The Supply Chain System of Cassava on the Tapioca Industry

    OpenAIRE

    Hardoyo,; Safrudin, Ahmad; Komara, Ahmad

    2013-01-01

    The quantity, quality and continueity guarantee of raw material supply is a one of define factor for the succesfull of production process. To solve the problems of raw material supply on tapioca industry, it is important to develop a correct raw material supply management. That management must be accurate on quantity, quality, continuity and price. One of the developed management is supply chain managementThe purpose of this paper is to make a cassava raw material supply chain on 100 ton prod...

  19. Motivation System of Crowdsourcing Community from a Supply Chain Perspective

    Directory of Open Access Journals (Sweden)

    Jiangang Pang

    2016-01-01

    Full Text Available This paper uses principal-agent theory to study the issue of incentivizing crowdsourcing communities. It proves that enterprises can generate innovation plans of high quality and expected utility using the crowdsourcing community. Outsourcers can encourage high-quality people to join by adopting a linear variable compensation scheme and make the low-quality people quit by requiring them to supply more effort. The paper also shows that enterprises’ participation in crowdsourcing community innovation can effectively improve their innovative ability and that it is necessary for enterprises to construct an effective and cooperative innovative system combining crowdsourcing community innovation and their own internal innovation.

  20. Study of a nonlinear system with shocks under broadband excitation. Application to a steam generator tube

    International Nuclear Information System (INIS)

    Thenint, Th.

    2011-01-01

    The steam generator is a heat exchanger and participates to the nuclear safety. Energy is transferred from the primary to the secondary fluid through many U-tubes maintained vertically by support plates. A sludge deposit tends to modify the boundary conditions and the secondary fluid flow. A fluid-elastic instability can then occur and lead to quick tube ruin. This thesis seeks a better understanding of the effect of contact nonlinearity on the dynamics of a tube in-air intermittently impacting the support plates and its consequences in regards with instability. The use of discretized contact conditions with circular obstacles distributed over the thickness of the plates and the use of enriched reduction bases allow quick and relevant nonlinear numerical simulations. These simulations are well correlated with experimental measurements and valid even with strong nonlinearity or negative modal damping. The evolution of power spectral densities (PSD) with growing excitation amplitude is analyzed: padding of the anti-resonances, peak shift and spread. It is then shown that an apparent stiffness associated with a permanent bilateral contact is pertinent to describe these transitions. In the case of an unstable linear system, one demonstrates that the nonlinearity keeps the responses bounded or stabilised, thus paving the way for future work with real or simulated fluid flows. (author)

  1. Monitoring device for radioactive leakage from steam system in nuclear power plant

    International Nuclear Information System (INIS)

    Ogawa, Tateo; Sato, Kohei

    1988-01-01

    Purpose: To improve the reliability for the monitor of radio-active leakage by accumulating small quantity of radioactivities each lower than the detectable level and increasing their dose rate. Constitution: Even if the steam system radiation monitor in the nuclear power plant is disposed for the detection of in-leak radioactivity, radioactive leakage can be monitored at high reliability by increasing the small quantity of radioactivities in the drains to a detectable sensitivity range of the monitor upon detection. In view of the above, in the present invention, radioactive material catching medium is incorporated to a radio-activity monitor spool piece for accumulating small quantity of radioactivities. Specifically as the catching medium, an ion exchange resin is used for the leakage of ionic radioactive material, while an ion exchange resin increased with the mixing ratio of a cationic resin or hollow thread membrane filter is used for crud-like radioactive material leakage. These catching media are incorporated into the spool piece, thereby enabling to catch even small quantity of radioactive leakage lower than the detectable sensitivity of the radiation monitor, if should occur, in the spool piece and enabling radioactive detection for the accumulated dose rate. (Horiuchi, T.)

  2. Synthesis of a novel adaptive wavelet optimized neural cascaded steam blow-off control system for a nuclear power plant

    International Nuclear Information System (INIS)

    Malik, A.H.; Memon, A.A.; Arshad, F.

    2013-01-01

    Blow-Off System Controller (MIMO AWNN-SBOSC) is designed based on real time dynamic parametric plant data of steam blow-off system with conventional Single-Input Multi-Output Proportional plus Integral plus Derivative Controller (SIMO PIDC). The proposed MIMO AWANN-SBOSC is designed using three Multi-Input Single-Output Adaptive Wavelet Neural Network based Steam Blow-Off System Controllers (MISO AWNN-SBOSC). The hidden layer of each MISO AWNN-SBOSC is formulated using Mother Wavelet Transforms (MWT). Using nonlinear dynamic neural data of designed MIMO AWNN-SBOSC, a Multi-Input Multi-Output Adaptive Wavelet Neural Network based Steam Blow-Off System Model (MIMO AWNN-SBOSM) is developed in cascaded mode. MIMO AWNN-SBOSM is designed using two MISO AWNN-SBOSM. All training, testing and validation of MIMO AWNN-SBOSC and MIMO AWNN-SBOSM are carried out in MA TLAB while all simulation experiments are performed in Visual C. The results of the new design is evaluated against conventional controller based measured data and found robust, fast and much better in performance. (author)

  3. Inductive-pulsed power supplying system for a betatron electromagnet

    International Nuclear Information System (INIS)

    Otrubyannikov, Yu.A.; Safronov, A.S.

    1984-01-01

    Circuit of producing quasitriangular current pulses designed for the pulsed power supply system of betatron electromagnet is described. Introduction of additional winding into electromagnet provides circuit galvanic isolation, artificial commutation of basic circuit thyristors and inductive power input to the winding during thyristor commutation. The considered system is used for excitation of betatron electromagnet up to 18 MeV. Magnetic field energy equals 1100 Y. The maximal voltage in energy storage capacitor - 4.8 kV. Current amplitude in basic winding - 335 A. The number of loops in basic winding equals 80, in additional one - 32. Current pulse duration in electromagnet-3.8 ms. The system provides operation with controlled current pulse frequency from 0 up to 150 Hz. The maximal consumption power - 18 kW

  4. The cyclical monitoring system for digital power supplies at SSRF

    International Nuclear Information System (INIS)

    Tang Junlong; Li Deming; Shen Tianjian

    2009-01-01

    Based on available digital PS testing system and long-distance monitoring hardwares, the cyclical monitoring system for digital power supplies (PS) was developed at SSRF. Two models, i.e.long-distance cyclical monitoring and local cyclical monitoring, were established. The software developed in LabVIEW language was applied to the two models without any user interface modification. The user interface is simple. The system is suitable for debugging the digital PSs during long-distance monitoring and examining the performance. The long-distance model imitates the digital PSs' status for fault analysis and communication between the digital PS and the centre control room. The local model simultaneously examines stability of 18 new PSs for 24 h, monitors the PS controller, and detects malfunction. Parameters and status of the controller can be stored in Excel or Text file. The two models have been used at SSRF for monitoring the digital PSs. (authors)

  5. Study on intermediate frequency power supply automatic monitor system

    International Nuclear Information System (INIS)

    Wang Yuntong; Xu Bin

    2007-06-01

    A new design project of the automatic monitor system for the intermediate frequency power supply system by using the communication server is put for- ward and the realizing principle method and the key technique are clarified in detail. This system made use of the conversion function with the series communication server's control, realized the data collecting function by the double machine backup and redundancy. The new network system adopted the photoelectric-insulated-communication connect device and the diagnosis technique, increased the anti-interference ability, the communication adopted the technique by the alarm information sending out in first and circularly repeating, the slowly speed is overcame in the original monitor network system, and strengthened the celerity of the monitor system and the reliability of the alarm report. After the new monitor system running, the result shows that the functions is more perfect than the original monitor system, the usage is more convenient, have the higher and dependable stability, the report of alarm is more quickly, and is convenient for the analysis after the trouble, at the same time, the system still have the strong ability and value to expand. (authors)

  6. Steam turbines for nuclear power stations in Czechoslovakia and their use for district heating

    International Nuclear Information System (INIS)

    Drahy, J.

    1989-01-01

    The first generation of nuclear power stations in Czechoslavakia is equipped with 440 MW e pressurized water reactors. Each reactor supplies two 220 MW, 3000 rpm condensing type turbosets operating with saturated steam. After the completion of heating water piping systems, all of the 24 units of 220 MW in Czechoslovak nuclear power stations will be operated as dual purpose units, delivering both electricity and heat. At the present time, second-generation nuclear power stations, with 1000 MW e PWRs, are being built. Each such plant is equipped with one 1000 MW full-speed saturated steam turbine. The turbine is so designed as to permit the extraction of steam corresponding to the following quantities of heat: 893 MJ/s with three-stage water heating (150/60 0 C); and 570 MJ/s with two-stage water heating (120/60 0 C). The steam is taken from uncontrolled steam extraction points. (author)

  7. Hybrid solar-PLG system for industrial scale steam and hot water generation; Sistema hibrido solar-GLP para geracao de vapor e agua quente em escala industrial

    Energy Technology Data Exchange (ETDEWEB)

    Saidel, Marco A.; Monteiro, Marcio D.; Gimenes, Andre L.V.; Fujii, Ricardo J. [Universidade de Sao Paulo (GEPEA/EPUSP), SP (Brazil). Dept. Engenharia Energia e Automacao Eletricas. Grupo de Energia], e-mail: saidel@pea.usp.br, e-mail: marcio.monteiro@poli.usp.br, e-mail: gimenes@gmail.com, e-mail: fujii@gmail.com

    2008-07-01

    This paper presents an initiative conceived for attending to objectives of the PUREFA (Program for Rational Use of Energy and Alternative Sources) of the Sao Paulo university, Brazil. The indicative consists of the implantation of a solar collector system for pre-heating of the water used in the production of the steam consumed at the university restaurant, with a production of 5800 meals per day. This system (auxiliary to the original steam boiler) pre-heats the water of the boiler minimizing the energy expenses for the production of steam and hot water.

  8. Avoiding steam-bubble-collapse-induced water hammers in piping systems

    International Nuclear Information System (INIS)

    Chou, Y.; Griffith, P.

    1989-10-01

    In terms of the frequency of occurrence, steam bubble collapse in subcooled water is the dominant initiating mechanism for water hammer events in nuclear power plants. Water hammer due to steam bubble collapse occurs when water slug forms in stratified horizontal flow, or when steam bubble is trapped at the end of the pipe. These types of water hammer events have been studied experimentally and analytically in order to develop stability maps showing those combinations of filling velocities and liquid subcooling that cause water hammer and those which don't. In developing the stability maps, experiments with different piping orientations were performed in a low pressure laboratory apparatus. Details of these experiments are described, including piping arrangement, test procedures, and test results. Visual tests using a transparent Lexan pipe are also performed to study the flow regimes accompanying the water hammer events. All analytical models were tested by comparison with the corresponding experimental results. Based on these models, and step-by-step approach for each flow geometry is presented for plant designers and engineers to follow in avoiding water hammer induced by steam bubble collapse when admitting cold water into pipes filled with steam. 37 refs., 54 figs., 2 tabs

  9. External costs and taxes in heat supply systems

    International Nuclear Information System (INIS)

    Karlsson, Aasa; Gustavsson, Leif

    2003-01-01

    A systems approach was used to compare different heating systems from a consumer perspective. The whole energy system was considered from natural resources to the required energy services. District heating, electric heat pumps, electric boilers, natural-gas-, oil- or pellet-fired local boilers were considered when supplying heat to a detached house. The district heat production included wood-chip-fired and natural-gas-fired cogeneration plants. Electricity other than cogenerated electricity was produced in wood-chip- and natural-gas-fired stand-alone power plants. The analysis includes four tax scenarios, as well as the external cost of environmental and health damage arising from energy conversion emission based on the ExternE study of the European Commission. The most cost-efficient systems were the natural-gas and oil boiler systems, followed by the heat pump and district heating systems, when the external cost and taxes were excluded. When including the external costs of CO 2 emission, the wood-fuel-based systems were much more cost efficient than the fossil-fuel-based systems, also when CO 2 capture and storage were applied. The external costs are, however, highly uncertain. Taxes steer towards lowering energy use and lowering CO 2 emission if they are levied solely on all the fossil-fuel-related emission and fuel use in the systems. If consumer electricity and heat taxes are used, the taxes have an impact on the total cost, regardless of the fuel used, thereby benefiting fuel-based local heating systems. The heat pump systems were the least affected by taxes, due to their high energy efficiency. The electric boiler systems were the least cost-efficient systems, also when the external cost and taxes were included

  10. OVERVIEW OF THE RHIC INSERTION REGION, SEXTUPOLE, AND SNAKE POWER SUPPLY SYSTEMS

    International Nuclear Information System (INIS)

    BRUNO, D.; ENG, W.; GANETIS, G.; LAMBIASE, R.F.; SANDBERG, J.

    2001-01-01

    The Relativistic Heavy Ion Collider (RHIC) was commissioned in 1999 and 2000. RHIC requires power supplies to supply currents to highly inductive superconducting magnets. The RHIC Insertion Region (IR) contains many shunt power supplies to trim the current of different magnet elements in a large superconducting magnet circuit. There are a total of 237 Insertion Region power supplies in both RHIC rings. RHIC also requires sextupole power supplies. One sextupole power supply is connected across 12 sextupole magnets. There are a total of 24 sextupole power supplies in both rings. Snake magnets are also a part of the RHIC ring, and these snake magnets also require power supplies. There shall be a total of 24 snake power supplies in both rings. Power supply technology, connections, control systems and interfacing with the Quench Protection System will be presented

  11. Design of fuzzy learning control systems for steam generator water level control

    International Nuclear Information System (INIS)

    Park, Gee Yong

    1996-02-01

    A fuzzy learning algorithm is developed in order to construct the useful control rules and tune the membership functions in the fuzzy logic controller used for water level control of nuclear steam generator. The fuzzy logic controllers have shown to perform better than conventional controllers for ill-defined or complex processes such as nuclear steam generator. Whereas the fuzzy logic controller does not need a detailed mathematical model of a plant to be controlled, its structure is to be made on the basis of the operator's linguistic information experienced from the plant operations. It is not an easy work and also there is no systematic way to translate the operator's linguistic information into quantitative information. When the linguistic information of operators is incomplete, tuning the parameters of fuzzy controller is to be performed for better control performance. It is the time and effort consuming procedure that controller designer has to tune the structure of fuzzy logic controller for optimal performance. And if the number of control inputs is many and the rule base is constructed in multidimensional space, it is very difficult for a controller designer to tune the fuzzy controller structure. Hence, the difficulty in putting the experimental knowledge into quantitative (or numerical) data and the difficulty in tuning the rules are the major problems in designing fuzzy logic controller. In order to overcome the problems described above, a learning algorithm by gradient descent method is included in the fuzzy control system such that the membership functions are tuned and the necessary rules are created automatically for good control performance. For stable learning in gradient descent method, the optimal range of learning coefficient not to be trapped and not to provide too slow learning speed is investigated. With the optimal range of learning coefficient, the optimal value of learning coefficient is suggested and with this value, the gradient

  12. Modeling integrated water user decisions in intermittent supply systems

    Science.gov (United States)

    Rosenberg, David E.; Tarawneh, Tarek; Abdel-Khaleq, Rania; Lund, Jay R.

    2007-07-01

    We apply systems analysis to estimate household water use in an intermittent supply system considering numerous interdependent water user behaviors. Some 39 household actions include conservation; improving local storage or water quality; and accessing sources having variable costs, availabilities, reliabilities, and qualities. A stochastic optimization program with recourse decisions identifies the infrastructure investments and short-term coping actions a customer can adopt to cost-effectively respond to a probability distribution of piped water availability. Monte Carlo simulations show effects for a population of customers. Model calibration reproduces the distribution of billed residential water use in Amman, Jordan. Parametric analyses suggest economic and demand responses to increased availability and alternative pricing. It also suggests potential market penetration for conservation actions, associated water savings, and subsidies to entice further adoption. We discuss new insights to size, target, and finance conservation.

  13. Corruption analysis and life span forecast research on sylphon bellows of nuclear-powered steam system of ship

    International Nuclear Information System (INIS)

    Song Chao; Chen Lisheng; Song Meicun; Wang Wei

    2012-01-01

    The fracture of the corrugated pipe has a dad effect to the operation of reactor which can cause the small-break LOCA. The corrosion is the key reason of the fracture. On the base of the analysis on corruption reason of the sylphon bellows and combine the characteristic of the limited sample point of it, the Grey theory was used in the assessment of corrosion life span of corrugated pipe in nuclear steam system. Through applying the GM (1, 1) model in inferring the discipline of corrosion quantity and combining traditional statistical method, the corrosion life of steam pipe was evaluated. It indicates that the model is precise, simple and the result is reliable. (authors)

  14. Digital supply chain management by using it systems

    OpenAIRE

    Stanišauskas, Ramūnas

    2018-01-01

    There are a lot of researches done to better understand the main principles of supply chain management, therefore supply chain management is well understood and quite common. On the other hand, nowadays more and more products and services are developed in digital environment, therefore regular supply chains are no longer viable and it is quite hard to adapt them. Suppliers in digital supply chain are creating digital products by using computer technologies and therefore digital products never...

  15. Experiences from Loviisa Nuclear Power Station concerning the decontamination of steam generators and primary system components

    International Nuclear Information System (INIS)

    Jaernstroem, R.

    1989-01-01

    Loviisa 1 and 2 are 465 MWe PWR units of the Soviet type VVER-440. Loviisa 1 has been in commercial operation since spring 1977 and Loviisa 2 from the beginning of 1980. Decontamination of primary circuit components - even big ones as steam generators - can be performed in an efficient and quick way with good results and resonable expences. Total costs for decontamination of the two steam generators including planning, construction, documentation, operation, chemicals etc. did not rise above 100,000.00 dollars. (author) 6 figs., 2 tabs

  16. Corrosion critique of the 2 1/4 Cr--1 Mo steel for LMFBR steam generation system applications

    International Nuclear Information System (INIS)

    Zima, G.E.

    1977-07-01

    The unstabilized ferritic steel of nominal composition, 2 1 / 4 Cr-1Mo, has been proposed for critical structural assignments in LMFBR powerplants, specifically: the tubing, tubesheet and shell of the evaporator and superheater components. The interest in this steel has been based on a presumably favorable general corrosion property spectrum, acceptable mechanical properties and fabricability, and certain economies associated with the low alloy content. This report is an attempt at a general corrosion assessment for the 2 1 / 4 Cr-1Mo steel and an identification of corrosion problem areas potential to this steel from the sodium and water/steam systems of the proposed working environment. There is a considerable area of uncertainty in the sodium-side response of 2 1 / 4 Cr-1Mo steel, centered in the loss and redisposition of carbon during long-term exposure to sodium of various impurity backgrounds. It is submitted that present evidence relating to the water/steam-side corrosion behavior of the 2 1 / 4 Cr-1Mo steel, under nominal and conceivable perturbed environmental conditions, constitutes the principal concern for the proposed LMFBR powerplant applications of this steel. It is suggested that this unfavorable corrosion aspect represents an inherent limitation of the low alloy content of this steel, probably largely independent of melting and processing recourses, and it is a sufficient basis to question the incentive for a continuation of the collateral studies of this steel for the proposed LMFBR steam generation system assignments

  17. Intrusion problematic during water supply systems' operation

    Energy Technology Data Exchange (ETDEWEB)

    Mora-Rodriguez, Jesus; Lopez-Jimenez, P. Amparo [Departamento de Ingenieria Hidraulica y Medio Ambiente, Universidad Politecnica de Valencia, Camino de Vera, s/n, 46022, Valencia (Spain); Ramos, Helena M. [Civil Engineering Department and CEHIDRO, Instituto Superior Tecnico, Technical University of Lisbon, Av. Rovisco Pais, 1049-001, Lisbon (Portugal)

    2011-07-01

    Intrusion through leaks occurrence is a phenomenon when external fluid comes into water pipe systems. This phenomenon can cause contamination problems in drinking pipe systems. Hence, this paper focuses on the entry of external fluids across small leaks during normal operation conditions. This situation is especially important in elevated points of the pipe profile. Pressure variations can origin water volume losses and intrusion of contaminants into the drinking water pipes. This work focuses in obtaining up the physical representation on a specific case intrusion in a pipe water system. The combination of two factors is required to generate this kind of intrusion in a water supply system: on one hand the existence of at least a leak in the system; on the other hand, a pressure variation could occur during the operation of the system due to consumption variation, pump start-up or shutdown. The potential of intrusion during a dynamic or transient event is here analyzed. To obtain this objective an experimental case study of pressure transient scenario is analyzed with a small leak located nearby the transient source.

  18. Flexible procurement systems is key to supply chain sustainability

    Directory of Open Access Journals (Sweden)

    Surajit Bag

    2016-04-01

    Full Text Available Background: In this dynamic business environment, manufacturers are focusing primarily on delivery performance and competitive pricing to win orders. It is essential that manufacturers adopt flexible procurement systems (FPSs in such an uncertain environment for business sustainability. Objectives: The purpose of the study is to identify the elements of FPSs and model the interrelationships between elements of FPSs and, finally, to understand how FPSs are linked with supply chain sustainability. Method: Besides providing a brief conceptual review of FPSs, the study largely illustrates the use of an innovative multi-criteria decision-making approach called total interpretive structural modelling (TISM. Results: The total interpretive structural modelling–based model evaluates the causality and illustrates elements with interpretation of relations and suggests that bottom-level elements are vital for sustainability in FPSs and avert risks. Secondly, strategic sourcing is positively influencing supplier integration. Thirdly, supplier integration positively influences supplier responsiveness. Fourthly, skills of flexible procurement workforce positively influence supplier integration. Fifthly, it is found that supplier integration positively influences flexible transportation. The sixth finding suggests that supplier integration positively influences eco-friendly packaging. The seventh finding highlights that supplier integration positively influences ISO 14001 certifications. The eighth finding explains that supplier responsiveness positively influences customer satisfaction. It is also observed that flexible transport reduces operational cost and environmental costs. The second last finding explains eco-friendly packaging and reduction in environmental cost by careful selection of packing material and chemicals. Lastly, it is found that ISO 14001/environmental certifications reduce environmental costs by greening suppliers and pressurises them

  19. Modelling and exergoeconomic-environmental analysis of combined cycle power generation system using flameless burner for steam generation

    International Nuclear Information System (INIS)

    Hosseini, Seyed Ehsan; Barzegaravval, Hasan; Ganjehkaviri, Abdolsaeid; Wahid, Mazlan Abdul; Mohd Jaafar, M.N.

    2017-01-01

    Highlights: • Using flameless burner as a supplementary firing system after gas turbine is modeled. • Thermodynamic, economic and environmental analyses of this model are performed. • Efficiency of the plant increases about 6% and CO_2 emission decreases up to 5.63% in this design. • Available exergy for work production in both gas cycle and steam cycle increases in this model. - Abstract: To have an optimum condition for the performance of a combined cycle power generation, using supplementary firing system after gas turbine was investigated by various researchers. Since the temperature of turbine exhaust is higher than auto-ignition temperature of the fuel in optimum condition, using flameless burner is modelled in this paper. Flameless burner is installed between gas turbine cycle and Rankine cycle of a combined cycle power plant which one end is connected to the outlet of gas turbine (as primary combustion oxidizer) and the other end opened to the heat recovery steam generator. Then, the exergoeconomic-environmental analysis of the proposed model is evaluated. Results demonstrate that efficiency of the combined cycle power plant increases about 6% and CO_2 emission reduces up to 5.63% in this proposed model. It is found that the variation in the cost is less than 1% due to the fact that a cost constraint is implemented to be equal or lower than the design point cost. Moreover, exergy of flow gases increases in all points except in heat recovery steam generator. Hence, available exergy for work production in both gas cycle and steam cycle will increase in new model.

  20. System Description of the Electrical Power Supply System for the ATLAS Integral Test Loop

    International Nuclear Information System (INIS)

    Moon, S. K.; Park, J. K.; Kim, Y. S.; Song, C. H.; Baek, W. P.

    2007-02-01

    An integral effect test loop for pressurized water reactors (PWRs), the ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), is constructed by Thermal-Hydraulics Safety Research Team in Korea Atomic Energy Research Institute (KAERI). The ATLAS facility has been designed to have the length scale of 1/2 and area scale of 1/144 compared with the reference plant, APR1400. This report describes the design and technical specifications of the electrical power supply system which supplies the electrical powers to core heater rods, other heaters, various pumps and other systems. The electrical power supply system had acquired the final approval on the operation from the Korea Electrical Safety Corporation. During performance tests for the operation and control, the electrical power supply system showed completely acceptable operation and control performance