WorldWideScience

Sample records for steam generation plants

  1. Steam generator assessment for sustainable power plant operation

    International Nuclear Information System (INIS)

    Drexler, Andreas; Fandrich, Joerg; Ramminger, Ute; Montaner-Garcia, Violeta

    2012-09-01

    Water and steam serve in the water-steam cycle as the energy transport and work media. These fluids shall not affect, through corrosion processes on the construction materials and their consequences, undisturbed plant operation. The main objectives of the steam water cycle chemistry consequently are: - The metal release rates of the structural materials shall be minimal - The probability of selective / localized forms of corrosion shall be minimal. - The deposition of corrosion products on heat transfer surfaces shall be minimized. - The formation of aggressive media, particularly local aggressive environments under deposits, shall be avoided. These objectives are especially important for the steam generators (SGs) because their condition is a key factor for plant performance, high plant availability, life time extension and is important to NPP safety. The major opponent to that is corrosion and fouling of the heating tubes. Effective ways of counteracting all degradation problems and thus of improving the SG performance are to keep SGs in clean conditions or if necessary to plan cleaning measures such as mechanical tube sheet lancing or chemical cleaning. Based on more than 40 years of experience in steam-water cycle water chemistry treatment AREVA developed an overall methodology assessing the steam generator cleanliness condition by evaluating all available operational and inspection data together. In order to gain a complete picture all relevant water chemistry data (e.g. corrosion product mass balances, impurity ingress), inspection data (e.g. visual inspections and tube sheet lancing results) and thermal performance data (e.g. heat transfer calculations) are evaluated, structured and indexed using the AREVA Fouling Index Tool Box. This Fouling Index Tool Box is more than a database or statistical approach for assessment of plant chemistry data. Furthermore the AREVA's approach combines manufacturer's experience with plant data and operates with an

  2. Steam 80 steam generator instrumentation

    International Nuclear Information System (INIS)

    Carson, W.H.; Harris, H.H.

    1980-01-01

    This paper describes two special instrumentation packages in an integral economizer (preheater) steam generator of one of the first System 80 plants scheduled to go into commercial operation. The purpose of the instrumentation is to obtain accurate operating information from regions of the secondary side of the steam generator inaccessible to normal plant instrumentation. In addition to verification of the System 80 steam generator design predictions, the data obtained will assist in verification of steam generator thermal/hydraulic computer codes developed for generic use in the industry

  3. Soviet steam generator technology: fossil fuel and nuclear power plants

    International Nuclear Information System (INIS)

    Rosengaus, J.

    1987-01-01

    In the Soviet Union, particular operational requirements, coupled with a centralized planning system adopted in the 1920s, have led to a current technology which differs in significant ways from its counterparts elsewhere in the would and particularly in the United States. However, the monograph has a broader value in that it traces the development of steam generators in response to the industrial requirements of a major nation dealing with the global energy situation. Specifically, it shows how Soviet steam generator technology evolved as a result of changing industrial requirements, fuel availability, and national fuel utilization policy. The monograph begins with a brief technical introduction focusing on steam-turbine power plants, and includes a discussion of the Soviet Union's regional power supply (GRES) networks and heat and power plant (TETs) systems. TETs may be described as large central co-generating stations which, in addition to electricity, provide heat in the form of steam and hot water. Plants of this type are a common feature of the USSR today. The adoption of these cogeneration units as a matter of national policy has had a central influence on Soviet steam generator technology which can be traced throughout the monograph. The six chapters contain: a short history of steam generators in the USSR; steam generator design and manufacture in the USSR; boiler and furnace assemblies for fossil fuel-fired power stations; auxiliary components; steam generators in nuclear power plants; and the current status of the Soviet steam generator industry. Chapters have been abstracted separately. A glossary is included containing abbreviations and acronyms of USSR organizations. 26 references

  4. Clinch river breeder reactor plant steam generator water quality

    Energy Technology Data Exchange (ETDEWEB)

    Van Hoesen, D; Lowe, P A

    1975-07-01

    The recent problems experienced by some LWR Steam Generators have drawn attention to the importance of system water quality and water/ steam side corrosion. Several of these reactor plants have encountered steam generator failures due to accelerated tube corrosion caused, in part, by poor water quality and corrosion control. The CRBRP management is aware of these problems, and the implications that they have for the Clinch River Breeder Reactor Plant (CPBRP) Steam Generator System (SGS). Consequently, programs are being implemented which will: (1) investigate the corrosion mechanisms which may be present in the CRBRP SGS; (2) assure steam generator integrity under design and anticipated off-normal water quality conditions; and (3) assure that the design water quality levels are maintained at all times. However, in order to understand the approach being used to examine this potential problem, it is first necessary to look at the CRBRP SGS and the corrosion mechanisms which may be present.

  5. Clinch river breeder reactor plant steam generator water quality

    International Nuclear Information System (INIS)

    Van Hoesen, D.; Lowe, P.A.

    1975-01-01

    The recent problems experienced by some LWR Steam Generators have drawn attention to the importance of system water quality and water/ steam side corrosion. Several of these reactor plants have encountered steam generator failures due to accelerated tube corrosion caused, in part, by poor water quality and corrosion control. The CRBRP management is aware of these problems, and the implications that they have for the Clinch River Breeder Reactor Plant (CPBRP) Steam Generator System (SGS). Consequently, programs are being implemented which will: 1) investigate the corrosion mechanisms which may be present in the CRBRP SGS; 2) assure steam generator integrity under design and anticipated off-normal water quality conditions; and 3) assure that the design water quality levels are maintained at all times. However, in order to understand the approach being used to examine this potential problem, it is first necessary to look at the CRBRP SGS and the corrosion mechanisms which may be present

  6. Steam generators for nuclear power plants

    International Nuclear Information System (INIS)

    Tillequin, Jean

    1975-01-01

    The role and the general characteristics of steam generators in nuclear power plants are indicated, and particular types are described according to the coolant nature (carbon dioxide, helium, light water, heavy water, sodium) [fr

  7. Steam generator and condenser design of WWER-1000 type of nuclear power plant

    International Nuclear Information System (INIS)

    Zare Shahneh, Abolghasem.

    1995-03-01

    Design process of steam generator and condenser at Russian nuclear power plant type WWER-1000 is identified. The four chapter of the books are organized as nuclear power plant, types of steam generators specially horizontal steam generator, process of steam generator design and the description of condenser and its process design

  8. Improvements in steam cycle electric power generating plants

    International Nuclear Information System (INIS)

    Bienvenu, Claude.

    1973-01-01

    The invention relates to a steam cycle electric energy generating plants of the type comprising a fossil or nuclear fuel boiler for generating steam and a turbo alternator group, the turbine of which is fed by the boiler steam. The improvement is characterized in that use is made of a second energy generating group in which a fluid (e.g. ammoniac) undergoes a condensation cycle the heat source of said cycle being obtained through a direct or indirect heat exchange with a portion of the boiler generated steam whereby it is possible without overloading the turbo-alternator group, to accomodate any increase of the boiler power resulting from the use of another fuel while maintaining a maximum energy output. This can be applied to electric power stations [fr

  9. Thermodynamic analysis of heat recovery steam generator in combined cycle power plant

    Directory of Open Access Journals (Sweden)

    Ravi Kumar Naradasu

    2007-01-01

    Full Text Available Combined cycle power plants play an important role in the present energy sector. The main challenge in designing a combined cycle power plant is proper utilization of gas turbine exhaust heat in the steam cycle in order to achieve optimum steam turbine output. Most of the combined cycle developers focused on the gas turbine output and neglected the role of the heat recovery steam generator which strongly affects the overall performance of the combined cycle power plant. The present paper is aimed at optimal utilization of the flue gas recovery heat with different heat recovery steam generator configurations of single pressure and dual pressure. The combined cycle efficiency with different heat recovery steam generator configurations have been analyzed parametrically by using first law and second law of thermodynamics. It is observed that in the dual cycle high pressure steam turbine pressure must be high and low pressure steam turbine pressure must be low for better heat recovery from heat recovery steam generator.

  10. Electric power generating plant having direct-coupled steam and compressed-air cycles

    Science.gov (United States)

    Drost, M.K.

    1981-01-07

    An electric power generating plant is provided with a Compressed Air Energy Storage (CAES) system which is directly coupled to the steam cycle of the generating plant. The CAES system is charged by the steam boiler during off peak hours, and drives a separate generator during peak load hours. The steam boiler load is thereby levelized throughout an operating day.

  11. Electric power generating plant having direct coupled steam and compressed air cycles

    Science.gov (United States)

    Drost, Monte K.

    1982-01-01

    An electric power generating plant is provided with a Compressed Air Energy Storage (CAES) system which is directly coupled to the steam cycle of the generating plant. The CAES system is charged by the steam boiler during off peak hours, and drives a separate generator during peak load hours. The steam boiler load is thereby levelized throughout an operating day.

  12. Worldwide assessment of steam-generator problems in pressurized-water-reactor nuclear power plants

    International Nuclear Information System (INIS)

    Woo, H.H.; Lu, S.C.

    1981-01-01

    Objective is to assess the reliability of steam generators of pressurized water reactor (PWR) power plants in the United States and abroad. The assessment is based on operation experience of both domestic and foreign PWR plants. The approach taken is to collect and review papers and reports available from the literature as well as information obtained by contacting research institutes both here and abroad. This report presents the results of the assessment. It contains a general background of PWR plant operations, plant types, and materials used in PWR plants. A review of the worldwide distribution of PWR plants is also given. The report describes in detail the degradation problems discovered in PWR steam generators: their causes, their impacts on the performance of steam generators, and the actions to mitigate and avoid them. One chapter is devoted to operating experience of PWR steam generators in foreign countries. Another discusses the improvements in future steam generator design

  13. Steam generator for use in nuclear power plants

    International Nuclear Information System (INIS)

    Cella, A.

    1980-01-01

    An improved steam generator is described for use in a nuclear power plant of the pressurized water type in which a turbine generator is driven by the steam output of the steam generator to provide electrical power therefrom. The improvement comprises providing a vertically movable grid structure vertically extending within the interior of the lower housing portion of the steam generator through which individual tubes comprising a vertically extending tube bundle extend. The tube bundle has a tube sheet at one end thereof supporting the tube bundle for the tubes extending through the tube sheet in flow through communication with a heat exchange fluid inlet. The grid structure defines grid apertures therein through which the individual tubes extend with each of the grid apertures being in surrounding relationship with a portion of an associated one of the tubes. The grid structure is movable for a predetermined vertical extent, such as by hydraulic means, such as a piston, along the tubes for vertically displacing the means defining the grid apertures by a sufficient amount for removing the previously surrounded portion of each of the tubes from the associated grid apertures whereby an enhanced reading of the condition of the tubes at the previously surrounded portion is enabled. The steam generator may comprise vertically assemblable modules which are removably mounted together in sealing relationship, with the modules comprising a base module, a tube bundle module removably mountable on the base module in sealing relationship therewith and an uppermost drier module removably mountable on the tube bundle module in sealing relationship therewith whereby ready access to removal of the tube bundle module in situ from the nuclear power plant steam generator is facilitated

  14. HTGR steam generator development

    International Nuclear Information System (INIS)

    Schuetzenduebel, W.G.; Hunt, P.S.; Weber, M.

    1976-01-01

    More than 40 gas-cooled reactor plants have produced in excess of 400 reactor years of operating experience which have proved a reasonably high rate of gas-cooled reactor steam generator availability. The steam generators used in these reactors include single U-tube and straight-tube steam generators as well as meander type and helically wound or involute tube steam generators. It appears that modern reactors are being equipped with helically wound steam generators of the once-through type as the end product of steam generator evolution in gas-cooled reactor plants. This paper provides a general overview of gas-cooled reactor steam generator evolution and operating experience and shows how design criteria and constraints, research and development, and experience data are factored into the design/development of modern helically wound tube steam generators for the present generation of gas-cooled reactors

  15. Strain measurements of nuclear power plant steam generator antiseismic supports

    International Nuclear Information System (INIS)

    Kulichevsky, R.

    1997-01-01

    The nuclear power plants steam generators have different types of structural supports. One of these types are the antiseismic supports, which are intended to be under stress only if a seismic event takes place. Nevertheless, the antiseismic supports lugs, that are welded to the steam generator vessel, are subjected to thermal fatigue because of the temperature cycles related with the shut down and start up operations performed during the life of the nuclear power plant. In order to evaluate the stresses that the lugs are subjected to, several strain gages were welded on two supports lugs, positioned at two heights of one of the Embalse nuclear power plant steam generators. In this paper, the instrumentation used and the strain measurements obtained during two start up operations are presented. The influence of the plant start up operation parameters on the lugs strain evolution is also analyzed. (author) [es

  16. Thermal circuit and supercritical steam generator of the BGR-300 nuclear power plant

    International Nuclear Information System (INIS)

    Afanas'ev, B.P.; Godik, I.B.; Komarov, N.F.; Kurochnkin, Yu.P.

    1979-01-01

    Secondary coolant circuit and a steam generator for supercritical steam parameters of the BGR-300 reactor plant are described. The BGR-300 plant with a 300 MW(e) high-temperature gas-cooled fast reactor is developed as a pilot commercial plant. It is shown that the use of a supercritical pressure steam increases the thermal efficiency of the plant and descreases thermal releases to the environment, permits to use home-made commercial turbine plants of large unit power. The proposed supercritical pressure steam generator has considerable advantages from the viewpoint of heat transfer and hydrodynamical processes

  17. Thermo hydrodynamical analyses of steam generator of nuclear power plant

    International Nuclear Information System (INIS)

    Petelin, S.; Gregoric, M.

    1984-01-01

    SMUP computer code for stationary model of a U-tube steam generator of a PWR nuclear power plant was developed. feed water flow can enter through main and auxiliary path. The computer code is based on the one dimensional mathematical model. Among the results that give an insight into physical processes along the tubes of steam generator are distribution of temperatures, water qualities, heat transfer rates. Parametric analysis permits conclusion on advantage of each design solution regarding heat transfer effects and safety of steam generator. (author)

  18. Operating experience with steam generator water chemistry in Japanese PWR plants

    International Nuclear Information System (INIS)

    Onimura, K.; Hattori, T.

    1991-01-01

    Since the first PWR plant in Japan started its commercial operation in 1970, seventeen plants are operating as of the end of 1990. First three units initially applied phosphate treatment as secondary water chemistry control and then changed to all volatile treatment (AVT) due to phosphate induced wastage of steam generator tubing. The other fourteen units operate exclusively under AVT. In Japan, several corrosion phenomena of steam generator tubing, resulted from secondary water chemistry, have been experienced, but occurrence of those phenomena has decreased by means of improvement on impurity management, boric acid treatment and high hydrazine operation. Recently secondary water chemistry in Japanese plants are well maintained in every stage of operation. This paper introduces brief summary of the present status of steam generators and secondary water chemistry in Japan and ongoing activities of investigation for future improvement of reliability of steam generator. History and present status of secondary water chemistry in Japanese PWRs were introduced. In order to get improved water chemistry, the integrity of secondary system equipments is essential and the improvement in water chemistry has been achieved with the improvement in equipments and their usage. As a result of those efforts, present status of secondary water is excellent. However, further development for crevice chemistry monitoring technique and an advanced water chemistry data management system is desired for the purpose of future improvement of reliability of steam generator

  19. Integrated Gasification SOFC Plant with a Steam Plant

    DEFF Research Database (Denmark)

    Rokni, Masoud; Pierobon, Leonardo

    2011-01-01

    A hybrid Solid Oxide Fuel Cell (SOFC) and Steam Turbine (ST) plant is integrated with a gasification plant. Wood chips are fed to the gasification plant to produce biogas and then this gas is fed into the anode side of a SOFC cycle to produce electricity and heat. The gases from the SOFC stacks...... enter into a burner to burn the rest of the fuel. The offgases after the burner are now used to generate steam in a Heat Recovery Steam Generator (HRSG). The generated steam is expanded in a ST to produce additional power. Thus a triple hybrid plant based on a gasification plant, a SOFC plant...... and a steam plant is presented and studied. The plant is called as IGSS (Integrated Gasification SOFC Steam plant). Different systems layouts are presented and investigated. Electrical efficiencies up to 56% are achieved which is considerably higher than the conventional integrated gasification combined...

  20. Disposal of Steam Generators from Decommissioning of PWR Nuclear Power Plants

    International Nuclear Information System (INIS)

    Walberg, Mirko; Viermann, Joerg; Beverungen, Martin; Kemp, Lutz; Lindstroem, Anders

    2008-01-01

    Amongst other materials remarkable amounts of radioactively contaminated or activated scrap are generated from the dismantling of Nuclear Power Plants. These scrap materials include contaminated pipework, fittings, pumps, the reactor pressure vessel and other large components, most of them are heat exchangers. Taking into account all commercial and technical aspects an external processing and subsequent recycling of the material might be an advantageous option for many of these components. The disposal of steam generators makes up an especially challenging task because of their measures, their weight and compared to other heat exchangers high radioactive inventory. Based on its experiences from many years of disposal of smaller components of NPP still in operation or under decommissioning GNS and Studsvik Nuclear developed a concept for disposal of steam generators, also involving experiences made in Sweden. The concept comprises transport preparations and necessary supporting documents, the complete logistics chain, steam generator treatment and the processing of arising residues and materials not suitable for recycling. The first components to be prepared, shipped and treated according to this concept were four steam generators from the decommissioning of the German NPP Stade which were removed from the plant and shipped to the processing facility during the third quarter of 2007. Although the plant had undergone a full system decontamination, due to the remaining contamination in a number of plugged tubes the steam generators had to be qualified as industrial packages, type 2 (IP-2 packages), and according to a special requirement of the German Federal Office for Radiation Protection a license for a shipment under special arrangement had to be applied for. The presentation gives an overview of the calculations and evidences required within the course of the IP-2 qualification, additional requirements of the competent authorities during the licensing procedure as

  1. Modular steam generator for use in nuclear power plants

    International Nuclear Information System (INIS)

    Cella, A.

    1979-01-01

    An improved steam generator for a PWR is described. A turbine generator is driven by the steam output of the steam generator to provide electrical power. The improvement provides vertically assemblable modules which are removably mounted together in sealing relationship. The modules comprising a base module, a tube bundle module removably mountable on the base module in sealing relationship, and an uppermost dryer module removably mountable on the tube bundle module in sealing relationship. Ready access to and removal of the tube bundle module in situ from the nuclear power plant steam generator is facilitated. The dryer module contains moisture separator for drying the generated steam. The base module, upon which the associated weight of the vertically assembled dryer module and tube bundle module are supported, contains the inlet and outlet for the heat exchange fluid. The tube bundle module contains the tube bundle through which the heat exchange fluid flows as well as an inlet for feedwater. The tube sheet serves as a closure flange for the tube bundle module, with the associated weight of the vertically assembled dryer module and tube bundle module on the tube sheet closure flange effectuating the sealing relationship between the base module and the tube bundle module for facilitating closure

  2. Fluid distribution network and steam generators and method for nuclear power plant training simulator

    International Nuclear Information System (INIS)

    Alliston, W.H.; Johnson, S.J.; Mutafelija, B.A.

    1975-01-01

    A description is given of a training simulator for the real-time dynamic operation of a nuclear power plant which utilizes apparatus that includes control consoles having manual and automatic devices corresponding to simulated plant components and indicating devices for monitoring physical values in the simulated plant. A digital computer configuration is connected to the control consoles to calculate the dynamic real-time simulated operation of the plant in accordance with the simulated plant components to provide output data including data for operating the control console indicating devices. In the method and system for simulating a fluid distribution network of the power plant, such as that which includes, for example, a main steam system which distributes steam from steam generators to high pressure turbine steam reheaters, steam dump valves, and feedwater heaters, the simultaneous solution of linearized non-linear algebraic equations is used to calculate all the flows throughout the simulated system. A plurality of parallel connected steam generators that supply steam to the system are simulated individually, and include the simulation of shrink-swell characteristics

  3. International examples of steam generator replacement

    International Nuclear Information System (INIS)

    Wiechmann, K.

    1993-01-01

    Since 1979-1980 a total of twelve nuclear power plants world-wide have had their steam generators replaced. The replacement of the Combustion steam generators in the Millstone-2 plant in the United States was completed very recently. Steam generator replacement activities are going on at present in four plants. In North Anna, the steam generators have been under replacement since January 1990. In Japan, preparations have been started for Genkai-1. Since January 1992, the two projects in Beznau-1, Switzerland, and Doel-3, Belgium, have bee planned and executed in parallel. Why steam generator replacement? There are a number of defect mechanisms which give rise to the need for early steam generator replacement. One of the main reasons is the use of Inconel-600 as material for the heating tubes. Steam generator heating tubes made of Inconel-600 have been known to exhibit their first defects due to stress corrosion cracking after less than one year of operation. (orig.) [de

  4. Reliability study: steam generation and distribution system, Portsmouth Gaseous Diffusion Plant

    International Nuclear Information System (INIS)

    Baker, F.E.; Davis, E.L.; Dent, J.T.; Walters, D.E.; West, R.M.

    1982-10-01

    A reliability study for determining the ability of the Steam Generation and Distribution System to provide reliable and adequate service through the year 2000 has been completed. This study includes an evaluation of the X-600 Steam Plant and the steam distribution system. The Steam Generation and Distribution System is in good overall condition, but to maintain this condition, the reliability study team made twelve recommendations. Eight of the recommendations are for repair or replacement of existing equipment and have a total estimated cost of $540,000. The other four recommendations are for additional testing, new procedure implementation, or continued investigations

  5. Steam generator tube failures

    International Nuclear Information System (INIS)

    MacDonald, P.E.; Shah, V.N.; Ward, L.W.; Ellison, P.G.

    1996-04-01

    A review and summary of the available information on steam generator tubing failures and the impact of these failures on plant safety is presented. The following topics are covered: pressurized water reactor (PWR), Canadian deuterium uranium (CANDU) reactor, and Russian water moderated, water cooled energy reactor (VVER) steam generator degradation, PWR steam generator tube ruptures, the thermal-hydraulic response of a PWR plant with a faulted steam generator, the risk significance of steam generator tube rupture accidents, tubing inspection requirements and fitness-for-service criteria in various countries, and defect detection reliability and sizing accuracy. A significant number of steam generator tubes are defective and are removed from service or repaired each year. This wide spread damage has been caused by many diverse degradation mechanisms, some of which are difficult to detect and predict. In addition, spontaneous tube ruptures have occurred at the rate of about one every 2 years over the last 20 years, and incipient tube ruptures (tube failures usually identified with leak detection monitors just before rupture) have been occurring at the rate of about one per year. These ruptures have caused complex plant transients which have not always been easy for the reactor operators to control. Our analysis shows that if more than 15 tubes rupture during a main steam line break, the system response could lead to core melting. Although spontaneous and induced steam generator tube ruptures are small contributors to the total core damage frequency calculated in probabilistic risk assessments, they are risk significant because the radionuclides are likely to bypass the reactor containment building. The frequency of steam generator tube ruptures can be significantly reduced through appropriate and timely inspections and repairs or removal from service

  6. Steam generators and waste heat boilers for process and plant engineers

    CERN Document Server

    Ganapathy, V

    2014-01-01

    Incorporates Worked-Out Real-World ProblemsSteam Generators and Waste Heat Boilers: For Process and Plant Engineers focuses on the thermal design and performance aspects of steam generators, HRSGs and fire tube, water tube waste heat boilers including air heaters, and condensing economizers. Over 120 real-life problems are fully worked out which will help plant engineers in evaluating new boilers or making modifications to existing boiler components without assistance from boiler suppliers. The book examines recent trends and developments in boiler design and technology and presents novel idea

  7. Steam generator tube degradation at the Doel 4 plant influence on plant operation and safety

    International Nuclear Information System (INIS)

    Scheveneels, G.

    1997-01-01

    The steam generator tubes of Doel 4 are affected by a multitude of corrosion phenomena. Some of them have been very difficult to manage because of their extremely fast evolution, non linear evolution behavior or difficult detectability and/or measurability. The exceptional corrosion behavior of the steam generator tubes has had its drawbacks on plant operation and safety. Extensive inspection and repair campaigns have been necessary and have largely increased outage times and radiation exposure to personnel. Although considerable effort was invested by the utility to control corrosion problems, non anticipated phenomena and/or evolution have jeopardized plant safety. The extensive plugging and repairs performed on the steam generators have necessitated continual review of the design basis safety studies and the adaptation of the protection system setpoints. The large asymmetric plugging has further complicated these reviews. During the years many preventive and recently also defence measures have been implemented by the utility to manage corrosion and to decrease the probability and consequences of single or multiple tube rupture. The present state of the Doel 4 steam generators remains troublesome and further examinations are performed to evaluate if continued operation until June '96, when the steam generators will be replaced, is justified

  8. Hybrid preheat/recirculating steam generator

    International Nuclear Information System (INIS)

    Lilly, G.P.

    1985-01-01

    The patent describes a hybrid preheat/recirculating steam generator for nuclear power plants. The steam generator utilizes recirculated liquid to preheat incoming liquid. In addition, the steam generator incorporates a divider so as to limit the amount of recirculating water mixed with the feedwater. (U.K.)

  9. Limits to the Recognizability of Flaws in Non-Destructive Testing Steam-Generator Tubes for Nuclear-Power Plants

    International Nuclear Information System (INIS)

    Kuhlmann, A.; Adamsky, F.-J.

    1965-01-01

    In the Federal Republic of Germany there are nuclear reactors under construction with steam generators inside the reactor pressure-vessel. As a result design repairs of steam- generator tubes are very difficult and cause large shut-down times of the nuclear-power plant. It is known that numerous troubles in operating conventional power plants are results of steam-generator tube damages. Because of the high total costs of these reactors it. is necessary to construct the steam generators especially in such a manner that the load factor of the power plant is as high as possible. The Technischer Überwachungs-Verein Rheinland was charged to supervise and to test fabrication and construction of the steam generators to see that this part of the plant was as free of defects as possible. The experience gained during this work is of interest for manufacture and construction of steam generators for nuclear-power plants in general. This paper deals with the efficiency limits of non-destructive testing steam-generator tubes. The following tests performed will be discussed in detail: (a) Automatic ultrasonic testing of the straight tubes in the production facility; (b) Combined ultrasonic and radiographic testing of the bent tubes and tube weldings; (c) Other non-destructive tests. (author) [fr

  10. On the reliability of steam generator performance at nuclear power plants with WWER type reactors

    International Nuclear Information System (INIS)

    Styrikovich, M.A.; Margulova, T.Kh.

    1974-01-01

    The problem of ensuring reliable operation of steam generators in a nuclear power plant with a water-cooled, water-moderated reactor (WWER) was studied. At a nuclear power plant with a vertical steam generator (specifically, a Westinghouse product) the steam generator tubes were found to have been penetrated. Shutdown was due to corrosion disintegration of the austenitic stainless steel, type 18/8, used as pipe material for the heater surface. The corrosion was the result of the action of chlorine ions concentrated in the moisture contained in the iron oxide films deposited in low parts of the tube bundle, directly at the tube plate. Blowing through did not ensure complete removal of the film, and in some cases the construction features of the steam generator made removal of the film practically impossible. Replacement of type 18/8 stainless steel by other construction material, e.g., Inconel, did not give good results. To ensure reliable operation of vertical steam generators in domestic practice, the generators are designed without a low tube plate (a variant diagram of the vertical steam generator of such construction for the water-cooled, water-moderated reactor 1000 is presented). When low tube plates are used the film deposition is intolerable. For organization of a non-film regime a complex treatment of the feed water is used, in which the amount of complexion is calculated from the stoichmetric ratios with the composition of the feed water. It is noted that, if 100% condensate purification is used with complexon processing of the feed water to the generator, we can calculate the surface of the steam-generator heater without considering the outer placement on the tubes. In this the cost of the steam generator and all the nuclear power plants with WWER type reactors is decreased even with installation of a 100% condensate purification. It is concluded that only simultaneous solution of construction and water-regime problems will ensure relaible operation of

  11. Prevention and mitigation of steam-generator water-hammer events in PWR plants

    International Nuclear Information System (INIS)

    Han, J.T.; Anderson, N.

    1982-11-01

    Water hammer in nuclear power plants is an unresolved safety issue under study at the NRC (USI A-1). One of the identified safety concerns is steam generator water hammer (SGWH) in pressurized-water reactor (PWR) plants. This report presents a summary of: (1) the causes of SGWH; (2) various fixes employed to prevent or mitigate SGWH; and (3) the nature and status of modifications that have been made at each operating PWR plant. The NRC staff considers that the issue of SGWH in top feedring designs has been technically resolved. This report does not address technical findings relevant to water hammer in preheat type steam generators. 10 figures, 2 tables

  12. EPRI steam generator programs

    International Nuclear Information System (INIS)

    Martel, L.J.; Passell, T.O.; Bryant, P.E.C.; Rentler, R.M.

    1977-01-01

    The paper describes the current overall EPRI steam generator program plan and some of the ongoing projects. Because of the recent occurrence of a corrosion phenomenon called ''denting,'' which has affected a number of operating utilities, an expanded program plan is being developed which addresses the broad and urgent needs required to achieve improved steam generator reliability. The goal of improved steam generator reliability will require advances in various technologies and also a management philosophy that encourages conscientious efforts to apply the improved technologies to the design, procurement, and operation of plant systems and components that affect the full life reliability of steam generators

  13. Method to detect steam generator tube leakage

    International Nuclear Information System (INIS)

    Watabe, Kiyomi

    1994-01-01

    It is important for plant operation to detect minor leakages from the steam generator tube at an early stage, thus, leakage detection has been performed using a condenser air ejector gas monitor and a steam generator blow down monitor, etc. In this study highly-sensitive main steam line monitors have been developed in order to identify leakages in the steam generator more quickly and accurately. The performance of the monitors was verified and the demonstration test at the actual plant was conducted for their intended application to the plants. (author)

  14. Design of a steam generator for PWR power plants and steady state simulation

    International Nuclear Information System (INIS)

    Ferreira, W.J.

    1982-01-01

    A procedure and a computer code for the thermal design of a steam generator for PWR power plants is developed. A vertical integral steam generator with inverted U-tubes and natural circulation of the secondary side is selected for modelling. Primary fluid velocity and recirculation ratio are varied to obtain the preliminary dimensions. Further, adjustments are made through iteractive solution of the equations of conservation of mass, energy and momentum. An agreement is found between design calculations for steam generators of different capacities and existing designs. (Author) [pt

  15. The steam generator repair project of the Donald C. Cook Nuclear Plant, Unit 2

    International Nuclear Information System (INIS)

    White, J.D.

    1993-01-01

    Donald C. Cook Nuclear Plant Unit 2 is part of a two unit nuclear complex located in southwestern Michigan and owned and operated by the Indiana Michigan Power Company. The Cook Nuclear Plant is a pressurized water reactor (PWR) plant with four Westinghouse Series 51 steam generators housed in an ice condenser containment. This paper describes the program undertaken by Indiana Michigan Power and the American Electric Power Service Corporation (AEPSC) to repair the Unit 2 steam generators. (Both Indiana Michigan Power and AEPSC arc subsidiaries of American Electric Power Company, Incorporated (AEP). AEPSC provides management and technical support services to Indiana Michigan Power and the other AEP operating companies.) Eddy current examinations, in a series of refueling and forced outages between November 1983 and July 1986 resulted in 763 (5.6%) plugged tubes. In order to maintain adequate reactor core cooling, a limit of 10% is placed on the allowable percentage of steam generator tubes that can be removed from service by plugging. Additionally, sections of tubes were removed for metallurgical analysis and confirmed that the degradation was due to intergranular stress corrosion cracking. In developing the decision on how to repair the steam generators, four alternative actions were considered for addressing these problems: retubing in place, sleeving, operating at 80% reactor power to lower temperature and thus reduce the rate of corrosion, replacing steam generator lower assemblies

  16. Strategic maintenance plan for Cernavoda steam generators

    International Nuclear Information System (INIS)

    Cicerone, T.; Dhar, D.; VandenBerg, J.P.

    2002-01-01

    Steam generators are among the most important pieces of equipment in a nuclear power plant. They are required full time during the plant operation and obviously no redundancy exists. Past experience has shown that those utilities which implemented comprehensive steam generator inspection and maintenance programs and strict water chemistry controls, have had good steam generator performance that supports good overall plant performance. The purpose of this paper is to discuss a strategic Life Management and Operational-monitoring program for the Cernavoda steam generators. The program is first of all to develop a base of expertise for the management of the steam generator condition; and that is to be supported by a program of actions to be accomplished over time to assess their condition, to take measures to avoid degradation and to provide for inspections, cleaning and modifications as necessary. (author)

  17. Corrosion Evaluation and Corrosion Control of Steam Generators

    International Nuclear Information System (INIS)

    Maeng, W. Y.; Kim, U. C.; Sung, K. W.; Na, J. W.; Lee, Y. H.; Lee, D. H.; Kim, K. M.

    2008-06-01

    Corrosion damage significantly influences the integrity and efficiency of steam generator. Corrosion problems of steam generator are unsolved issues until now even though much effort is made around world. Especially the stress corrosion cracking of heat exchange materials is the first issue to be solved. The corrosion protection method of steam generator is important and urgent for the guarantee of nuclear plant's integrity. The objectives of this study are 1) to evaluate the corrosion properties of steam generator materials, 2) to optimize the water chemistry of steam generator and 3) to develop the corrosion protection method of primary and secondary sides of steam generator. The results will be reflected to the water chemistry guideline for improving the integrity and efficiency of steam generator in domestic power plants

  18. Steam generator operation and maintenance

    International Nuclear Information System (INIS)

    Lee, C.K.

    2004-01-01

    Corrosion of steam generator tube has resulted in the need for extensive repair and replacement of steam generators. Over the past two decades, steam generator problems in the United States were viewed to be one of the most significant contributor to lost generation in operating PWR plants. When the SGOG-I (Steam Generator Owners Groups) was formed in early 1977, denting was responsible for almost 90% of the tube plugging. By the end of 1982, this figure was reduced to less than 2%. During the existence of SGOG-II (from 1982 to 1986), IGA/SCC (lntergranular Attack/Stress Corrosion Cracking) in the tube sheet, primary side SCC, pitting, and fretting surfaced as the primary causes of tube degradation. Although significant process has been made with wastage and denting, the utilities experience shows that the percentage of reactors plugging tubes and the percentage of tubes being plugged each year has remained relatively constant. The diversity of the damage mechanisms means that no one solution is likely to resolve all problems. The task of maintaining steam generator integrity continues to be formidable and challenging. As the older problems were brought under control, many new problems emerged. SGOG-II (Steam Generator Owners Group program from 1982 to 1986) has focused on these problem areas such as tube stress corrosion cracking (SCC) and intergranular attack (IGA) in the open tube sheet crevice, primary side tube cracking, pitting in the lower span, and tube fretting in preheated section and anti-vibration bar (AVB) locations. Primary Water Stress Corrosion Cracking (PWSCC) in the tube to tubesheet roll transition has been a wide spread problem in the Recirculation Steam Generators (RSG) during this period. Although significant progress has been made in resolving this problem, considerable work still remains. One typical problem in the Once Through Steam Generator (OTSG) was the tube support plate broached hole fouling which affects the OTSG steam generating

  19. Water regime of steam power plants

    International Nuclear Information System (INIS)

    Oesz, Janos

    2011-01-01

    The water regime of water-steam thermal power plants (secondary side of pressurized water reactors (PWR); fossil-fired thermal power plants - referred to as steam power plants) has changed in the past 30 years, due to a shift from water chemistry to water regime approach. The article summarizes measures (that have been realised by chemists of NPP Paks) on which the secondary side of NPP Paks has become a high purity water-steam power plant and by which the water chemistry stress corrosion risk of heat transfer tubes in the VVER-440 steam generators was minimized. The measures can also be applied to the water regime of fossil-fired thermal power plants with super- and subcritical steam pressure. Based on the reliability analogue of PWR steam generators, water regime can be defined as the harmony of construction, material(s) and water chemistry, which needs to be provided in not only the steam generators (boiler) but in each heat exchanger of steam power plant: - Construction determines the processes of flow, heat and mass transfer and their local inequalities; - Material(s) determines the minimal rate of general corrosion and the sensitivity for local corrosion damage; - Water chemistry influences the general corrosion of material(s) and the corrosion products transport, as well as the formation of local corrosion environment. (orig.)

  20. Horizontal steam generator thermal-hydraulics

    Energy Technology Data Exchange (ETDEWEB)

    Ubra, O. [SKODA Praha Company, Prague (Czechoslovakia); Doubek, M. [Czech Technical Univ., Prague (Czechoslovakia)

    1995-09-01

    Horizontal steam generators are typical components of nuclear power plants with pressure water reactor type VVER. Thermal-hydraulic behavior of horizontal steam generators is very different from the vertical U-tube steam generator, which has been extensively studied for several years. To contribute to the understanding of the horizontal steam generator thermal-hydraulics a computer program for 3-D steady state analysis of the PGV-1000 steam generator has been developed. By means of this computer program, a detailed thermal-hydraulic and thermodynamic study of the horizontal steam generator PGV-1000 has been carried out and a set of important steam generator characteristics has been obtained. The 3-D distribution of the void fraction and 3-D level profile as functions of load and secondary side pressure have been investigated and secondary side volumes and masses as functions of load and pressure have been evaluated. Some of the interesting results of calculations are presented in the paper.

  1. Possibilities of the metallurgical base in the manufacture of tubes for nuclear power plant steam generators

    International Nuclear Information System (INIS)

    Prnka, T.; Walder, V.; Dolenek, J.

    Current possibilities are briefly summarized of metallurgy in the manufacture of high-quality tubes for nuclear power plant steam generators, mainly for fast reactor power plants. Discussed are steel making possibilities, semi-finished product and tube forming with special regard to 2.25Cr1MoNiNb steel problems, heat treatment, finishing, and testing. Necessary equipment and technology for the production of steam generator tubes are less common in the existing practice and are demanding on investment; their introduction, however, is inevitable for securing quality production of steam generator tubes. (Kr)

  2. Corrosion Evaluation and Corrosion Control of Steam Generators

    Energy Technology Data Exchange (ETDEWEB)

    Maeng, W. Y.; Kim, U. C.; Sung, K. W.; Na, J. W.; Lee, Y. H.; Lee, D. H.; Kim, K. M

    2008-06-15

    Corrosion damage significantly influences the integrity and efficiency of steam generator. Corrosion problems of steam generator are unsolved issues until now even though much effort is made around world. Especially the stress corrosion cracking of heat exchange materials is the first issue to be solved. The corrosion protection method of steam generator is important and urgent for the guarantee of nuclear plant's integrity. The objectives of this study are 1) to evaluate the corrosion properties of steam generator materials, 2) to optimize the water chemistry of steam generator and 3) to develop the corrosion protection method of primary and secondary sides of steam generator. The results will be reflected to the water chemistry guideline for improving the integrity and efficiency of steam generator in domestic power plants.

  3. Steam generator tube rupture risk impact on design and operation of French PWR plants

    International Nuclear Information System (INIS)

    Depond, G.; Sureau, H.

    1984-01-01

    The experience of steam generator tube leaks incidents in PWR plants has resulted in an increase of EDF analysis leading to improvements in design and post-accidental operation for new projects and operating plants. The accident consequences are minimized for each of the NSSS three barriers: first barrier: safeguard systems design and operating procedures relying upon core safety allow to maintain a low level of primary radioactivity, second barrier: steam generator design and periodic inspection allow to reduce tube ruptures risks and third barrier: atmospheric releases are reduced as a result of optimal recovery procedures, detection improvements and atmospheric steam valves design improvements. (orig.)

  4. Steam generator operating experience update, 1982-1983

    International Nuclear Information System (INIS)

    Frank, L.

    1984-06-01

    This report is a continuation of earlier reports by the staff addressing pressurized water reactor steam generator operating experience. NUREG-0886, Steam Generator Tube Experience, published in February 1982 summarized experience in domestic and foreign plants through December 1981. This report summarizes steam generator operating experience in domestic plants for the years 1982 and 1983. Included are new problems encountered with secondary-side loose parts, sulfur-induced stress-assisted corrosion cracking, and flow-induced vibrational wear in the new preheater design steam generators. The status of Unresolved Safety Issues A3, A4, and A5 is also discussed

  5. Design of a partial inter-tube lancing system actuated by hydraulic power for type F model steam generator in nuclear power plant

    International Nuclear Information System (INIS)

    Kim, S. T.; Jeong, W. T.

    2008-01-01

    The sludge grown up in steam generators of nuclear power plants shortens the life-cycle of steam generators and reduces the output of power plants. So KHNP(Korea Hydro and Nuclear Power), the only nuclear power utility in Korea, removes it periodically using a steam generator lancing system during the outage of plants for an overhaul. KEPRI(Korea Electric Power Research Institute) has developed lancing systems with high pressured water nozzle for steam generators of nuclear power plants since 2001. In this paper, the design of a partial inter-tube lancing system for model F type steam generators will be described. The system is actuated without a DC motor inner steam generators because the motors in a steam generator make a trouble from high intensity of radioactivity as a break down

  6. LMFBR steam generator development: duplex bayonet tube steam generator. Volume II

    International Nuclear Information System (INIS)

    DeFur, D.D.

    1975-04-01

    This report represents the culmination of work performed in fulfillment of ERDA Contract AT(11-1)-2426, Task Agreement 2, in which alternate steam generator designs were developed and studied. The basic bayonet tube generator design previously developed by C-E under AEC Contract AT(11-1)-3031 was expanded by incorporating duplex heat transfer tubes to enhance the unit's overall safety and reliability. The effort consisted of providing and evaluating conceptual designs of the evaporator, superheater and reheater components for a large plant LMFBR steam generator (950 MWt per heat transport loop)

  7. Vertical steam generator

    International Nuclear Information System (INIS)

    Cuda, F.; Kondr, M.; Kresta, M.; Kusak, V.; Manek, O.; Turon, S.

    1982-01-01

    A vertical steam generator for nuclear power plants and dual purpose power plants consists of a cylindrical vessel in which are placed heating tubes in the form upside-down U. The heating tubes lead to the jacket of the cylindrical collector placed in the lower part of the steam generator perpendicularly to its vertical axis. The cylindrical collector is divided by a longitudinal partition into the inlet and outlet primary water sections of the heating tubes. One ends of the heating tube leads to the jacket of the collector for primary water feeding and the second ends of the heating tubes into the jacket of the collector which feeds and offtakes primary water from the heating tubes. (B.S.)

  8. Development of a steam generator lancing system

    International Nuclear Information System (INIS)

    Jeong, Woo-Tae; Kim, Seok-Tae; Hong, Sung-Yull

    2006-01-01

    It is recommended to clean steam generators of nuclear power plants during plant outages. Under normal operations, sludge is created and constantly accumulates in the steam generators. The constituents of this sludge are different depending on each power plant characteristics. The sludge of the Kori Unit 1 steam generator, for example, was found to be composed of 93% ferrous oxide, 3% carbon and 1% of silica oxide and nickel oxide each. The research to develop a lancing system that would remove sludge deposits from the tubesheet of a steam generator was started in 1998 by the Korea Electric Power Research Institute (KEPRI) of the Korea Electric Power Corporation (KEPCO). The first commercial domestic lancing system in Korea, and KALANS-I Lancing System, was completed in 2000 for Kori Unit 1 for cleaning the tubesheet of its Westinghouse Delta-60 steam generator. Thereafter, the success of the development and site implementation of the KALANS-I lancing system for YGN Units 1 and 2 and Ulchin Units 3 and 4 was also realized in 2004 for sludge removal at those sites. The upper bundle cleaning system for Westinghouse model F steam generators is now under development

  9. Steam generator design considerations for modular HTGR plant

    International Nuclear Information System (INIS)

    McDonald, C.F.; DeFur, D.D.

    1986-01-01

    Studies are in progress to develop a standard High Temperature Gas-Cooled Reactor (HTGR) plant design that is amenable to serial production and is licensable. Based on the results of trade studies performed in the DOE-funded HTGR program, activities are being focused to emphasize a modular concept based on a 350 MW(t) annular reactor core with prismatic fuel elements. Utilization of a multiplicity of the standard module affords flexibility in power rating for utility electricity generation. The selected modular HTGR concept has the reactor core and heat transport systems housed in separate steel vessels. This paper highlights the steam generator design considerations for the reference plant, and includes a discussion of the major features of the heat exchanger concept and the technology base existing in the U.S

  10. An expert system for steam generator maintenance

    International Nuclear Information System (INIS)

    Remond, A.

    1988-01-01

    The tube bundles in PWR steam generators are, by far, the major source of problems whether they are due to primary and secondary side corrosion mechanisms or to tube vibration-induced wear at tube support locations. Because of differences in SG operating, materials, and fabrication processes, the damage may differ from steam generator to steam generator. MPGV, an expert system for steam generator maintenance uses all steam generator data containing data on materials, fabrication processes, inservice inspection, and water chemistry. It has access to operational data for individual steam generators and contains models of possible degradation mechanisms. The objectives of the system are: · Diagnosing the most probable degradation mechanism or mechanisms by reviewing the entire steam generator history. · Identifying the tubes most exposed to future damage and evaluating the urgency of repair by simulating the probable development of the problem in time. · Establishing the appropriate preventive actions such as repair, inspection or other measures and establishing an action schedule. The system is intended for utilities either for individual plants before each inspection outage or any time an incident occurs or for a set of plants through a central MPGV center. (author)

  11. Current forgings and their properties for steam generator of nuclear plant

    International Nuclear Information System (INIS)

    Tsukada, Hisashi; Suzuki, Komei; Kusuhashi, Mikio; Sato, Ikuo

    1997-01-01

    Current steel forgings for steam generator (SG) of PWR plant are reviewed in the aspect of design and material improvement. The following three items are introduced. The use of integral type steel forgings for the fabrication of steam generator enhances the structural integrity and makes easier fabrication and inspection including in-service inspection. The following examples of current integral type forgings developed by the Japan Steel Works, Ltd. (JSW) are introduced: (1) primary head integrated with nozzles, manways and supports; (2) steam drum head integrated with nozzle and handhole; (3) conical shell integrated with cylindrical sections and handholes. In order to decrease the weight of steam generator, the high strength materials such as SA508, Cl.3a steel have been adopted in some cases. The properties of this steel are introduced and the chemistry and heat treatment condition are discussed. As one of the methods to minimize the macro- and micro-segregations, the use of vacuum carbon deoxidation (VCD), i.e. deoxidization of steel by gaseous CO reaction, with addition of Al for grain refining was investigated. The properties of SA508, Cl.3 steels with Low Si content are compared with those of conventional one

  12. Current forgings and their properties for steam generator of nuclear plant

    Energy Technology Data Exchange (ETDEWEB)

    Tsukada, Hisashi; Suzuki, Komei; Kusuhashi, Mikio; Sato, Ikuo [Japan Steel Works Ltd., Muroran (Japan)

    1997-12-31

    Current steel forgings for steam generator (SG) of PWR plant are reviewed in the aspect of design and material improvement. The following three items are introduced. The use of integral type steel forgings for the fabrication of steam generator enhances the structural integrity and makes easier fabrication and inspection including in-service inspection. The following examples of current integral type forgings developed by the Japan Steel Works, Ltd. (JSW) are introduced: (1) primary head integrated with nozzles, manways and supports; (2) steam drum head integrated with nozzle and handhole; (3) conical shell integrated with cylindrical sections and handholes. In order to decrease the weight of steam generator, the high strength materials such as SA508, Cl.3a steel have been adopted in some cases. The properties of this steel are introduced and the chemistry and heat treatment condition are discussed. As one of the methods to minimize the macro- and micro-segregations, the use of vacuum carbon deoxidation (VCD), i.e. deoxidization of steel by gaseous CO reaction, with addition of Al for grain refining was investigated. The properties of SA508, Cl.3 steels with Low Si content are compared with those of conventional one.

  13. Dynamic modelling of nuclear steam generators

    International Nuclear Information System (INIS)

    Kerlin, T.W.; Katz, E.M.; Freels, J.; Thakkar, J.

    1980-01-01

    Moving boundary, nodal models with dynamic energy balances, dynamic mass balances, quasi-static momentum balances, and an equivalent single channel approach have been developed for steam generators used in nuclear power plants. The model for the U-tube recirculation type steam generator is described and comparisons are made of responses from models of different complexity; non-linear versus linear, high-order versus low order, detailed modeling of the control system versus a simple control assumption. The results of dynamic tests on nuclear power systems show that when this steam generator model is included in a system simulation there is good agreement with actual plant performance. (author)

  14. Advanced technologies on steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Sakata, Kaoru; Nakamura, Yuuki [Mitsubishi Heavy Industry Co., Takasago (Japan); Nakamori, Nobuo; Mizutani, Toshiyuki; Uwagawa, Seiichi; Saito, Itaru [Mitsubishi Heavy Industry Co., Kobe (Japan); Matsuoka, Tsuyoshi [Mitsubishi Heavy Industry Co., Yokohama (Japan)

    1997-12-31

    The thermal-hydraulic tests for a horizontal steam generator of a next-generation PWR (New PWR-21) were performed. The purpose of these tests is to understand the thermal-hydraulic behavior in the secondary side of horizontal steam generator during the plant normal operation. A test was carried out with cross section slice model simulated the straight tube region. In this paper, the results of the test is reported, and the effect of the horizontal steam generator internals on the thermalhydraulic behavior of the secondary side and the circulation characteristics of the secondary side are discussed. (orig.). 3 refs.

  15. Advanced technologies on steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Sakata, Kaoru; Nakamura, Yuuki [Mitsubishi Heavy Industry Co., Takasago (Japan); Nakamori, Nobuo; Mizutani, Toshiyuki; Uwagawa, Seiichi; Saito, Itaru [Mitsubishi Heavy Industry Co., Kobe (Japan); Matsuoka, Tsuyoshi [Mitsubishi Heavy Industry Co., Yokohama (Japan)

    1998-12-31

    The thermal-hydraulic tests for a horizontal steam generator of a next-generation PWR (New PWR-21) were performed. The purpose of these tests is to understand the thermal-hydraulic behavior in the secondary side of horizontal steam generator during the plant normal operation. A test was carried out with cross section slice model simulated the straight tube region. In this paper, the results of the test is reported, and the effect of the horizontal steam generator internals on the thermalhydraulic behavior of the secondary side and the circulation characteristics of the secondary side are discussed. (orig.). 3 refs.

  16. Main characteristics and design features of steam generators for VG-400 plant

    International Nuclear Information System (INIS)

    Golovko, V.F.; Grebennik, V.N.; Gol'tsev, A.O.; Ivanov, S.M.; Sergeev, A.I.; Pospelov, V.N.

    1988-01-01

    The description of a steam generator for the VG-400 plant performed in two variants depending on a heat-exchange surface arrangement (one-bundle coil and module-cassette construction) is given. (author)

  17. Steam Generator control in Nuclear Power Plants by water mass inventory

    Energy Technology Data Exchange (ETDEWEB)

    Dong Wei [North Carolina State University, Department of Nuclear Engineering, Box 7909, Raleigh, NC 27695-7909 (United States); Doster, J. Michael [North Carolina State University, Department of Nuclear Engineering, Box 7909, Raleigh, NC 27695-7909 (United States)], E-mail: doster@eos.ncsu.edu; Mayo, Charles W. [North Carolina State University, Department of Nuclear Engineering, Box 7909, Raleigh, NC 27695-7909 (United States)

    2008-04-15

    Control of water mass inventory in Nuclear Steam Generators is important to insure sufficient cooling of the nuclear reactor. Since downcomer water level is measurable, and a reasonable indication of water mass inventory near steady-state, conventional feedwater control system designs attempt to maintain downcomer water level within a relatively narrow operational band. However, downcomer water level can temporarily react in a reverse manner to water mass inventory changes, commonly known as shrink and swell effects. These complications are accentuated during start-up or low power conditions. As a result, automatic or manual control of water level is difficult and can lead to high reactor trip rates. This paper introduces a new feedwater control strategy for Nuclear Steam Generators. The new method directly controls water mass inventory instead of downcomer water level, eliminating complications from shrink and swell all together. However, water mass inventory is not measurable, requiring an online estimator to provide a mass inventory signal based on measurable plant parameters. Since the thermal-hydraulic response of a Steam Generator is highly nonlinear, a linear state-observer is not feasible. In addition, difficulties in obtaining flow regime and density information within the Steam Generator make an estimator based on analytical methods impractical at this time. This work employs a water mass estimator based on feedforward neural networks. By properly choosing and training the neural network, mass signals can be obtained which are suitable for stable, closed-loop water mass inventory control. Theoretical analysis and simulation results show that water mass control can significantly improve the operation and safety of Nuclear Steam Generators.

  18. Steam Generator control in Nuclear Power Plants by water mass inventory

    International Nuclear Information System (INIS)

    Dong Wei; Doster, J. Michael; Mayo, Charles W.

    2008-01-01

    Control of water mass inventory in Nuclear Steam Generators is important to insure sufficient cooling of the nuclear reactor. Since downcomer water level is measurable, and a reasonable indication of water mass inventory near steady-state, conventional feedwater control system designs attempt to maintain downcomer water level within a relatively narrow operational band. However, downcomer water level can temporarily react in a reverse manner to water mass inventory changes, commonly known as shrink and swell effects. These complications are accentuated during start-up or low power conditions. As a result, automatic or manual control of water level is difficult and can lead to high reactor trip rates. This paper introduces a new feedwater control strategy for Nuclear Steam Generators. The new method directly controls water mass inventory instead of downcomer water level, eliminating complications from shrink and swell all together. However, water mass inventory is not measurable, requiring an online estimator to provide a mass inventory signal based on measurable plant parameters. Since the thermal-hydraulic response of a Steam Generator is highly nonlinear, a linear state-observer is not feasible. In addition, difficulties in obtaining flow regime and density information within the Steam Generator make an estimator based on analytical methods impractical at this time. This work employs a water mass estimator based on feedforward neural networks. By properly choosing and training the neural network, mass signals can be obtained which are suitable for stable, closed-loop water mass inventory control. Theoretical analysis and simulation results show that water mass control can significantly improve the operation and safety of Nuclear Steam Generators

  19. Wavelet network controller for nuclear steam generators

    International Nuclear Information System (INIS)

    Habibiyan, H; Sayadian, A; Ghafoori-Fard, H

    2005-01-01

    Poor control of steam generator water level is the main cause of unexpected shutdowns in nuclear power plants. Particularly at low powers, it is a difficult task due to shrink and swell phenomena and flow measurement errors. In addition, the steam generator is a highly complex, nonlinear and time-varying system and its parameters vary with operating conditions. Therefore, it seems that design of a suitable controller is a necessary step to enhance plant availability factor. The purpose of this paper is to design, analyze and evaluate a water level controller for U-tube steam generators using wavelet neural networks. Computer simulations show that the proposed controller improves transient response of steam generator water level and demonstrate its superiority to existing controllers

  20. Chemical cleaning - essential for optimal steam generator asset management

    International Nuclear Information System (INIS)

    Ammann, Franz

    2009-01-01

    Accumulation of deposits in Steam Generator is intrinsic during the operation of Pressurized Water Reactors. Such depositions lead to reduction of thermal performance, loss of component integrity and, in some cases, to power restrictions. Accordingly, removal of such deposits is an essential part of the asset management program of Steam Generators. Every plant has specific conditions, history and constraints which must be considered when planning and performing a chemical cleaning. Typical points are: -Constitution of the deposits or sludge - Sludge load - Sludge distribution in the steam generator - Existing or expected corrosion problems - Amount and tendency of fouling for waste treatment The strategy for chemical cleaning is developed from these points. The range of chemical cleaning treatments starts with very soft cleanings which can remove approximately 100kg per steam generator and ends with full scale, i.e., hard, cleanings which can remove several thousand kilograms of deposits from a steam generator. Dependent upon the desired goal for the operating plant and the steam generator material condition, the correct cleaning method can be selected. This requires flexible cleaning methods that can be adapted to the individual needs of a plant. Such customizing of chemical cleaning methods is a crucial factor for an optimized asset management program of steam generators in a nuclear power plant

  1. Technical development and its application on steam generator replacement

    International Nuclear Information System (INIS)

    Morita, Sadahiko; Hanzawa, Katsumi; Sato, Hajime; Kannoto, Yasuo.

    1995-01-01

    Twenty-two PWR nuclear power plants are now under commercial operation in Japan. Eight of these plants are scheduled to have their steam generators replaced by up-graded units as a social responsibility for improved reliability, economy and easier maintenance. To carry out steam generator replacement, main coolant pipe cutting and restoration techniques, remote controlled welding machines and other remote controlled equipment, templating techniques with which the new steam generator primary nozzles will fit the existing primary pipes correctly were developed. An adequate training program was carried out to establish these techniques and they were then applied in replacement work on site. The steam generators of the three plants were replaced completely in 1994. These newly developed techniques are to be applied in upcoming plants and replaced plants will be much reliable. (author)

  2. Cleanliness criteria to improve steam generator performance

    International Nuclear Information System (INIS)

    Schwarz, T.; Bouecke, R.; Odar, S.

    2005-01-01

    High steam generator performance is a prerequisite for high plant availability and possible life time extension. The major opponent to that is corrosion and fouling of the heating tubes. Such steam generator degradation problems arise from the continuous ingress of non-volatile contaminants, i.e. corrosion products and salt impurities may accumulate in the steam generators. These impurities have their origin in the secondary side systems. The corrosion products generally accumulate in the steam generators and form deposits not only in the flow restricted areas, such as on top of tube sheet and tube support structure, but also build scales on the steam generator heating tubes. In addition, the tube scales in general affect the steam generator thermal performance, which ultimately causes a reduction of power output. The most effective ways of counteracting all these degradation problems, and thus of improving the steam generator performance is to keep them in clean conditions or, if judged necessary, to plan cleaning measures such as mechanical tube sheet lancing or chemical cleaning. This paper presents a methodology how to assess the cleanliness condition of a steam generator by bringing together all available operational and inspection data such as thermal performance and water chemistry data. By means of this all-inclusive approach the cleanliness condition is quantified in terms of a fouling index. The fouling index allows to monitor the condition of a specific steam generator, compare it to other plants and, finally, to serve as criterion for cleaning measures such as chemical cleaning. The application of the cleanliness criteria and the achieved field results with respect to improvements of steam generator performance will be presented. (author)

  3. Digital simulation for nuclear once-through steam generators

    International Nuclear Information System (INIS)

    Chen, A.T.

    1976-01-01

    Mathematical models for calculating the dynamic response of the Oconee type once through steam generator (OTSG) and the integral economizer once through steam generator (IEOTSG) was developed and presented in this dissertation. Linear and nonlinear models of both steam generator types were formulated using the state variable, lumped parameter approach. Transient and frequency responses of system parameters were calculated for various perturbations from both the primary coolant side and the secondary side. Transients of key parameters, including primary outlet temperature, superheated steam outlet temperature, boiling length/subcooled length and steam pressure, were generated, compared and discussed for both steam generator types. Frequency responses of delta P/sub s//deltaT/sub pin/ of the linear OTSG model were validated by using the dynamic testing results obtained at the Oconee I nuclear power station. A sensitivity analysis in both the time and the frequency domains was performed. It was concluded that the mathematical and computer models developed in this dissertation for both the OTSG and the IEOTSG are suitable for overall plant performance evaluation and steam generator related component/system design analysis for nuclear plants using either type of steam generator

  4. Commissioning and maintenance experience on mechanical equipment in steam generators of captive power plant at HWP, Manuguru (Paper No. 5.3)

    International Nuclear Information System (INIS)

    Bhatnagar, R.; Sinha, Ashok; Mohan Rao, A.C.

    1992-01-01

    Heavy Water Project (Manuguru) is having a captive power plant to cater to the demands of steam and power for the main plant. During the commissioning and initial run of the steam generators and their auxiliaries, teething/initial problems were encountered in nearly all the equipment of the steam generators. This paper briefly describes some of the major problems faced during the commissioning of the steam generators. (author). 4 figs

  5. Steam generator materials

    International Nuclear Information System (INIS)

    Kim, Joung Soo; Han, J. H.; Kim, H. P.; Lim, Y. S.; Lee, D. H.; Suh, J. H.; Hwang, S. S.; Hur, D. H.; Kim, D. J.; Kim, Y. H.

    2002-05-01

    In order to keep the nuclear power plant(NPP)s safe and increase their operating efficiency, axial stress corrosion cracking(SCC)(IGA/IGSCC, PWSCC, PbSCC) test techniques were developed and SCC property data of the archive steam generator tubing materials having been used in nuclear power plants operating in Korea were produced. The data obtained in this study were data-based, which will be used to clarify the damage mechanisms, to operate the plants safely, and to increase the lifetime of the tubing. In addition, the basic technologies for the improvement of the SCC property of the tubing materials, for new SCC inhibition, for damaged tube repair, and for manufacturing processes of the tubing were developed. In the 1 phase of this long term research, basic SCC test data obtained from the archive steam generator tubing materials used in NPPs operating in Korea were established. These basic technologies developed in the 1 phase will be used in developing process optimization during the 2 phase in order to develop application technologies to the field nuclear power plants

  6. PMK-2. Experimental study on steam generator behaviour

    Energy Technology Data Exchange (ETDEWEB)

    Ezsoel, G.; Szabados, L.; Trosztel, I. [KFKI Atomic Energy Research Inst., Budabest (Hungary)

    1995-12-31

    The PMK-2 is a full pressure scaled-down model of the Paks Nuclear Power Plant, with a 1:2070 scaling ratio for the volume and power. It has a steam generator model which is a vertical section of the horizontal steam generator. The model has hot and cold collectors similarly to the steam generators of the plant. The heat transfer tubes are horizontal tubes. There are 82 rows of tubes and the elevations, as well as the heat transfer surface distribution is the same as in the plant. The elevation of the feed water supply is similar to that of the plant. To study the temperature distribution in both the primary and the secondary side several thermocouples are built in, in addition to the overall instrumentation of the loop which has again a high number of measurement channels. Paper gives a description and results of SPE-4, with special respect to the steam generator behaviour in both steady state and transient conditions. Axial distribution of coolant and feedwater temperatures are given for the primary and the secondary side of hot and cold collectors and the temperature distribution in the centre of steam generator. (orig.).

  7. PMK-2. Experimental study on steam generator behaviour

    Energy Technology Data Exchange (ETDEWEB)

    Ezsoel, G; Szabados, L; Trosztel, I [KFKI Atomic Energy Research Inst., Budabest (Hungary)

    1996-12-31

    The PMK-2 is a full pressure scaled-down model of the Paks Nuclear Power Plant, with a 1:2070 scaling ratio for the volume and power. It has a steam generator model which is a vertical section of the horizontal steam generator. The model has hot and cold collectors similarly to the steam generators of the plant. The heat transfer tubes are horizontal tubes. There are 82 rows of tubes and the elevations, as well as the heat transfer surface distribution is the same as in the plant. The elevation of the feed water supply is similar to that of the plant. To study the temperature distribution in both the primary and the secondary side several thermocouples are built in, in addition to the overall instrumentation of the loop which has again a high number of measurement channels. Paper gives a description and results of SPE-4, with special respect to the steam generator behaviour in both steady state and transient conditions. Axial distribution of coolant and feedwater temperatures are given for the primary and the secondary side of hot and cold collectors and the temperature distribution in the centre of steam generator. (orig.).

  8. Corrosion aspects in steam generators of nuclear power plants

    International Nuclear Information System (INIS)

    Visoni, E.; Santos Pinto, M. dos

    1988-01-01

    Steam generators of pressurized water reactors (PWR), transfer heat from a primary coolant system to a secondary coolant system. Primary coolant water is heated in the core and passes through the steam generator that transfer heat to the secondary coolant water. However, the steam generator is dead for ionic impurities, corrosion products and fabrication/maintenence residues. These impurities concentrate between crevice and cracks. Many types of degradation mechanisms affect the tubes. The tubes are dented, craked, ovalized, wasted, etc. This paper describes the main corrosion problems in steam generators and includes the corrective actions to considered to reduce or eliminate these corrosion problems. (author) [pt

  9. Thermal hydraulic studies in steam generator test facility

    International Nuclear Information System (INIS)

    Vinod, V.; Suresh Kumar, V.A.; Noushad, I.B.; Ellappan, T.R.; Rajan, K.K.; Rajan, M.; Vaidyanathan, G.

    2005-01-01

    Full text of publication follows: A 500 MWe fast breeder reactor is being constructed at Kalpakkam, India. This is a sodium cooled reactor with two primary and two secondary sodium loops with total 8 steam generators. The typical advantage of fast breeder plants is the high operating temperature of steam cycles and the high plant efficiency. To produce this high pressure and high temperature steam, once through straight tube vertical sodium heated steam generators are used. The steam is generated from the heat produced in the reactor core and being transported through primary and secondary sodium circuits. The steam generator is a 25 m high middle supported steam generator with expansion bend and 23 m heat transfer length. Steam Generator Test Facility (SGTF) constructed at Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam aims at performing various tests on a 5.5 MWt steam generator. This vertically simulated test article is similar in all respects to the proposed 157 MWt steam generator module for the Prototype Fast Breeder Reactor (PFBR), with reduced number of tubes. Heat transfer performance tests are done with this 19 tube steam generator at various load conditions. Sodium circuit for the SGTF is equipped with oil fired heater as heat source and centrifugal sodium pump, to pump sodium at 105 m 3 /hr flow rate. Other typical components like sodium to air heat exchanger, sodium purification system and hydrogen leak detection system is also present in the sodium circuit. High pressure steam produced in the steam generator is dumped in a condenser and recycled. Important tests planned in SGTF are the heat transfer performance test, stability test, endurance test and performance test of steam generator under various transients. The controlled operation of steam generator will be studied with possible control schemes. A steady state simulation of the steam generator is done with a mathematical model. This paper gives the details of heat transfer

  10. U-tube steam generator modelling: application to level control and comparison with plant data

    International Nuclear Information System (INIS)

    Gautier, A.; Petetrot, J.F.; Roulet, A.; Ruiz, P.; Zwingelstein, G.

    1979-01-01

    A nonlinear multinode digital model of a recirculating U-tube steam generator is first described. Comparison between the model and Fessenheim and Bugey tests results on power step and full load rejection is given. These transients are of special interest because they provide information on the boiler high frequency response and also insights into steam generator non linear behaviour. An example of steam generator modelling as applied to control system design is then presented. This example demonstrates major improvement of control loop performance at low load following implementation of a non linear gain which allows more efficient control of large perturbations. Results of testing on the Bugey 4 plant are also indicated

  11. Experience with modular steam generator production and application of new testing methods

    International Nuclear Information System (INIS)

    Olesovsky

    Experience is reviewed gained at the Trebic IBZKG plant with the production of modular steam generators. The plant started producing steam generators for the Jaslovske Bohunice nuclear power plant in 1965. In addition to the steam generator for the A-1, the plant also produced a loop for the Melekess power plant and a steam generator for the BOR-60 reactor. Operating experience gained so far allowed improving the quality of the BOR steam generator, especially in the tube-tube plate joint. A double tube plate was used and the welded joint shape was changed. As a result of high requirements on the quality of welded joints, the steam generator has successfully been in operation for more then 10,000 hours. The existing experience was utilized in designing a new steam generator named Nadya. Many design and technological requirements were presented concerning the Nadya generator and many new checking operations have been included in technology. (Kr)

  12. Evaluation of materials' corrosion and chemistry issues for advanced gas cooled reactor steam generators using full scale plant simulations

    International Nuclear Information System (INIS)

    Woolsey, I.S.; Rudge, A.J.; Vincent, D.J.

    1998-01-01

    Advanced Gas Cooled Reactors (AGRS) employ once-through steam Generators of unique design to provide steam at approximately 530 degrees C and 155 bar to steam turbines of similar design to those of fossil plants. The steam generators are highly compact, and have either a serpentine or helical tube geometry. The tubes are heated on the outside by hot C0 2 gas, and steam is generated on the inside of the tubes. Each individual steam generator tube consists of a carbon steel feed and primary economiser section, a 9%Cr steel secondary economiser, evaporator and primary superheater, and a Type 316L austenitic stainless steel secondary superheater, all within a single tube pass. The multi-material nature of the individual tube passes, the need to maintain specific thermohydraulic conditions within the different material sections, and the difficulties of steam generator inspection and repair, have required extensive corrosion-chemistry test programmes to ensure waterside corrosion does not present a challenge to their integrity. A major part of these programmes has been the use of a full scale steam generator test facility capable of simulating all aspects of the waterside conditions which exist in the plant. This facility has been used to address a wide variety of possible plant drainage/degradation processes. These include; single- and two-phase flow accelerated corrosion of carbon steel, superheat margins requirements and the stress-corrosion behaviour of the austenitic superheaters, on-load corrosion of the evaporator materials, and iron transport and oxide deposition behaviour. The paper outlines a number of these, and indicates how they have been of value in helping to maintain reliable operation of the plant. (author)

  13. LMR steam generator blowdown with RETRAN

    International Nuclear Information System (INIS)

    Wei, T.Y.C.

    1985-01-01

    One of the transients being considered in the FSAR Chapter 15 analyses of anticipated LMR transients is the fast blowdown of a steam generator upon inadvertent actuation of the liquid metal/water reaction mitigation system. For the blowdown analysis, a stand-alone steam generator model for the IFR plant was constructed using RETRAN

  14. Chemical cleaning an essential part of steam generator asset management

    International Nuclear Information System (INIS)

    Amman, Franz

    2008-01-01

    Chemical Cleaning an essential part of Steam Generator asset management accumulation of deposits is intrinsic for the operation of Steam Generators in PWRs. Such depositions often lead to reduction of thermal performance, loss of component integrity and, in some cases to power restrictions. Accordingly removal of such deposits is an essential part of the asset management of the Steam Generators in a Nuclear Power Plant. Every plant has its individual condition, history and constraints which need to be considered when planning and performing a chemical cleaning. Typical points are: - Sludge load amount and constitution of the deposits - Sludge distribution in the steam generator - Existing or expected corrosion problems - Amount and tendency of fouling for waste treatment Depending on this points the strategy for chemical cleaning shall be evolved. the range of treatment starts with very soft cleanings with a removal of approx 100 kg per steam generator and goes to a full scale cleaning which can remove up to several thousand kilograms of deposits from a steam generator. Depending on the goal to be achieved and the steam generator present an adequate cleaning method shall be selected. This requires flexible and 'customisable' cleaning methods that can be adapted to the individual needs of a plant. Such customizing of chemical cleaning methods is an essential factor for an optimized asset management of the steam generator in a nuclear power plant

  15. Steam generating system in LMFBR type reactors

    International Nuclear Information System (INIS)

    Kurosawa, Katsutoshi.

    1984-01-01

    Purpose: To suppress the thermal shock loads to the structures of reactor system and secondary coolant system, for instance, upon plant trip accompanying turbine trip in the steam generation system of LMFBR type reactors. Constitution: Additional feedwater heater is disposed to the pipeway at the inlet of a steam generator in a steam generation system equipped with a closed loop extended from a steam generator by way of a gas-liquid separator, a turbine and a condensator to the steam generator. The separated water at high temperature and high pressure from a gas-liquid separator is heat exchanged with coolants flowing through the closed loop of the steam generation system in non-contact manner and, thereafter, introduced to a water reservoir tank. This can avoid the water to be fed at low temperature as it is to the steam generator, whereby the thermal shock loads to the structures of the reactor system and the secondary coolant system can be suppressed. (Moriyama, K.)

  16. French steam generator design developments

    International Nuclear Information System (INIS)

    Ginier, R.; Campan, J.L.; Pontier, M.; Leridon, A.; Remond, A.; Castello, G.; Holcblat, A.; Paurobally, H.

    1986-01-01

    From the outset of the French nuclear power program, a significant R and D effort has been invested in improvement of the design and operation of Pressurized Water Reactors including a special committment to improving steam generators. The steam generator enhancement program has spawned a wide variety of specific R and D resources, e.g., low temperature hydraulic models for investigation of areas with single-phase flow, and freon-filled models for simulation of areas of steam generators experiencing two-phase flow (tube bundles and moisture separators). For the moisture separators, a large scale research program using freon-filled models and highly sophisticated instrumentation was used. Tests at reactor sites during startup of both 900 MWe and 1300 MWe have been used to validate the assumptions made on the basis of loop tests. These tests also demonstrated the validity of using freon to simulate two-phase flow conditions. The wealth of knowledge accumulated by the steam generator R and D program has been used to develop a new design of steam generators for the N4 plants. The current R and D effort is aimed at qualifying the N4 steam generator model and developing more comprehensive models. One prong of the R and D effort is the Megeve program. Megeve is a 25 MW steam generator which simulates operating conditions of the N4 model. The other prong is Clotaire, a freon-filled steam generator model which will be used to qualify thermal/hydraulic design codes used for multidimensional calculations for design of tube bundles

  17. Evolution of management activities and performance of the Point Lepreau Steam Generators

    International Nuclear Information System (INIS)

    Slade, J.; Keating, J.; Gendron, T.

    2007-01-01

    The Point Lepreau steam generators have been in service since 1983 when the plant was commissioned. During the first thirteen years of operation, Point Lepreau steam generator maintenance issues led to 3-4% unplanned plant incapability Steam generator fouling, corrosion, and the introduction of foreign materials during maintenance led to six tube leaks, two unplanned outages, two lengthy extended outages, and degraded thermal performance during this period. In recognition of the link between steam generator maintenance activities and plant performance, improvements to steam generator management activities have been continuously implemented since 1987. This paper reviews the evolution of steam generator management activities at Point Lepreau and the resulting improved trends in performance. Plant incapability from unplanned steam generator maintenance has been close to zero since 1996. The positive trends have provided a strong basis for the management strategies developed for post-refurbishment operation. (author)

  18. Steam generators under construction for the SNR-300 power plant

    Energy Technology Data Exchange (ETDEWEB)

    Essebaggers, J

    1975-07-01

    The prototype straight tube and the helical coil-steam generator has been designed and fabricated of which the straight tube steam generator has been successfully tested for over 3000 hours at prototypical conditions and is presently being dismantled for detailed examination of critical designed features. The prototype helical coil steam generator is presently under testing in the 50 MWt test facility at TNO-Hengelo with approximately 500 hours of operation at full load conditions. In an earlier presentation the design and fabrication of the prototype steam generators have been presented, while for this presentation the production units for SNR-300 will be discussed. Some preliminary information will be presented at this meeting of the dismantling operations of the prototype straight tube steam generator. (author)

  19. Steam generators under construction for the SNR-300 power plant

    International Nuclear Information System (INIS)

    Essebaggers, J.

    1975-01-01

    The prototype straight tube and the helical coil-steam generator has been designed and fabricated of which the straight tube steam generator has been successfully tested for over 3000 hours at prototypical conditions and is presently being dismantled for detailed examination of critical designed features. The prototype helical coil steam generator is presently under testing in the 50 MWt test facility at TNO-Hengelo with approximately 500 hours of operation at full load conditions. In an earlier presentation the design and fabrication of the prototype steam generators have been presented, while for this presentation the production units for SNR-300 will be discussed. Some preliminary information will be presented at this meeting of the dismantling operations of the prototype straight tube steam generator. (author)

  20. Regulation of ageing steam generators

    International Nuclear Information System (INIS)

    Jarman, B.L.; Grant, I.M.; Garg, R.

    1998-01-01

    Recent years have seen leaks and shutdowns of Canadian CANDU plants due to steam generator tube degradation by mechanisms including stress corrosion cracking, fretting and pitting. Failure of a single steam generator tube, or even a few tubes, would not be a serious safety related event in a CANDU reactor. The leakage from a ruptured tube is within the makeup capacity of the primary heat transport system, so that as long as the operator takes the correct actions, the off-site consequences will be negligible. However, assurance that no tubes deteriorate to the point where their integrity could be seriously breached as result of potential accidents, and that any leakage caused by such an accident will be small enough to be inconsequential, can only be obtained through detailed monitoring and management of steam generator condition. This paper presents the AECB's current approach and future regulatory directions regarding ageing steam generators. (author)

  1. Testing installation for a steam generator

    International Nuclear Information System (INIS)

    Dubourg, M.

    1985-01-01

    The invention proposes a testing installation for a steam generator associated to a boiler, comprising a testing exchanger connected to a feeding circuit in secondary fluid and to a circuit to release the steam produced, and comprising a heating-tube bundle connected to a closed circuit of circulation of a primary coolant at the same temperature and at the pressure than the primary fluid. The heating-tube bundle of the testing exchanger has the same height than the primary bundle of the steam generator and the testing exchanger is at the same level and near the steam generator and is fed by the same secondary fluid such as it is subject to the same operation phases during a long period. The in - vention applies, more particularly, to the steam generators of pressurized water nuclear power plants [fr

  2. Steam-Generator Integrity Program/Steam-Generator Group Project

    International Nuclear Information System (INIS)

    1982-10-01

    The Steam Generator Integrity Program (SGIP) is a comprehensive effort addressing issues of nondestructive test (NDT) reliability, inservice inspection (ISI) requirements, and tube plugging criteria for PWR steam generators. In addition, the program has interactive research tasks relating primary side decontamination, secondary side cleaning, and proposed repair techniques to nondestructive inspectability and primary system integrity. The program has acquired a service degraded PWR steam generator for research purposes. This past year a research facility, the Steam Generator Examination Facility (SGEF), specifically designed for nondestructive and destructive examination tasks of the SGIP was completed. The Surry generator previously transported to the Hanford Reservation was then inserted into the SGEF. Nondestructive characterization of the generator from both primary and secondary sides has been initiated. Decontamination of the channelhead cold leg side was conducted. Radioactive field maps were established in the steam generator, at the generator surface and in the SGEF

  3. Condition monitoring of steam turbo generators of captive power plant at HWP (Manuguru) through vibration analysis

    International Nuclear Information System (INIS)

    Krishnareddy, G.; Chandramouli, M.; Gupta, R.V.

    2002-01-01

    Turbo Generator is a critical equipment in steam based power plant circuit. Any failure causes loss of production and hence as applicable to Heavy Water Plant, Manuguru, it results in loss of heavy water production as the captive power plant at Manuguru is solely designed to supply steam and power to Main Plant, which is meant for production of heavy water. Thereby condition monitoring is very much essential and required as part of predictive maintenance program for the turbo generators which are in continuous operation. This paper focuses on identification of the turbo generator system through vibration spectrum, characterising and differentiating the fault mechanisms, trending the faults through changes in vibration spectrums and orbit plots and subsequently planning for corrective actions/measures after evaluating the changes in machine conditions

  4. Future development LMFBR-steam generators SNR2

    International Nuclear Information System (INIS)

    Essebaggers, J.; Pors, J.G.

    1975-01-01

    The development work for steam generators for large LMFBR plants by Neratoom will be reviewed consisting of: 1. Development engineering information. 2. Concept select studies followed by conceptual designs of selected models. 3. Development manufacturing techniques. 4. Detail design of a prototype unit. 5. Testing of sub-constructions for prototype steam generators. In this presentation item 1 and 2 above will be high lighted, identifying the development work for the SNR-2 steam generators on short term basis. (author)

  5. Steam generator replacement at the Obrigheim nuclear power station

    International Nuclear Information System (INIS)

    Pickel, E.; Schenk, H.; Huemmler, A.

    1984-01-01

    The Obrigheim Nuclear Power Station (KWO) is equipped with a dual-loop pressurized water reactor of 345 MW electric power; it was built by Siemens in the period 1965 to 1968. By the end of 1983, KWO had produced some 35 billion kWh in 109,000 hours of operation. Repeated leaks in the heater tubes of the two steam generators had occurred since 1971. Both steam generators were replaced in the course of the 1983 annual revision. Kraftwerk Union AG (KWU) was commissioned to plant and carry out the replacement work. Despite the leakages the steam generators had been run safely and reliably over a period of 14 years until their replacement. Replacing the steam generators was completed within twelve weeks. In addition to the KWO staff and the supervising crew of KWU, some 400 external fitters were employed on the job at peak work-load periods. For the revision of the whole plant, work on the emergency systems and replacement of the steam generators a maximum number of approx. 900 external fitters were employed in the plant in addition to some 250 members of the plant crew. The exposure dose of the personnel sustained in the course of the steam generator replacement was 690 man-rem, which was clearly below previous estimates. (orig.) [de

  6. Consolidated nuclear steam generator

    International Nuclear Information System (INIS)

    Jabsen, F.S.; Schluderberg, D.C.; Paulson, A.E.

    1978-01-01

    An improved system of providing power has a unique generating means for nuclear reactors with a number of steam generators in the form of replaceable modular units of the expendable type to attain the optimum in effective and efficient vaporization of fluid during the generating power. The system is most adaptable to undrground power plants and marine usage

  7. Babcock and Wilcox Canada steam generators past, present and future

    Energy Technology Data Exchange (ETDEWEB)

    Smith, J.C. [Babcock and Wilcox Canada, Cambridge, Ontario (Canada)

    1998-07-01

    The steam generators in all of the domestic CANDU Plants, and most of the foreign CANDU plants, were supplied by Babcock and Wilcox Canada, either on their own or in co-operation with local manufacturers. More than 200 steam generators have been supplied. In addition, Babcock and Wilcox Canada has taken the technology which evolved out of the CANDU steam generators and has adapted the technology to supply of replacement steam generators for PWR's. There is enough history and operating experience, plus laboratory experience, to point to the future directions which will be taken in steam generator design. This paper documents the steam generators which have been supplied, the experience in operation and maintenance, what has worked and not worked, and how the design, materials, and operating and maintenance philosophy have evolved. The paper also looks at future requirements in the market, and the continuing research and product development going on at Babcock and Wilcox to address the future steam generator requirements. (author)

  8. Babcock and Wilcox Canada steam generators past, present and future

    International Nuclear Information System (INIS)

    Smith, J.C.

    1998-01-01

    The steam generators in all of the domestic CANDU Plants, and most of the foreign CANDU plants, were supplied by Babcock and Wilcox Canada, either on their own or in co-operation with local manufacturers. More than 200 steam generators have been supplied. In addition, Babcock and Wilcox Canada has taken the technology which evolved out of the CANDU steam generators and has adapted the technology to supply of replacement steam generators for PWR's. There is enough history and operating experience, plus laboratory experience, to point to the future directions which will be taken in steam generator design. This paper documents the steam generators which have been supplied, the experience in operation and maintenance, what has worked and not worked, and how the design, materials, and operating and maintenance philosophy have evolved. The paper also looks at future requirements in the market, and the continuing research and product development going on at Babcock and Wilcox to address the future steam generator requirements. (author)

  9. Economic impact of latent heat thermal energy storage systems within direct steam generating solar thermal power plants with parabolic troughs

    International Nuclear Information System (INIS)

    Seitz, M.; Johnson, M.; Hübner, S.

    2017-01-01

    Highlights: • Integration of a latent heat thermal energy storage system into a solar direct steam generation power cycle. • Parametric study of solar field and storage size for determination of the optimal layout. • Evaluation of storage impact on the economic performance of the solar thermal power plant. • Economic comparison of new direct steam generation plant layout with state-of-the-art oil plant layout. - Abstract: One possible way to further reduce levelized costs of electricity of concentrated solar thermal energy is to directly use water/steam as the primary heat transfer fluid within a concentrated collector field. This so-called direct steam generation offers the opportunity of higher operating temperatures and better exergy efficiency. A technical challenge of the direct steam generation technology compared to oil-driven power cycles is a competitive storage technology for heat transfer fluids with a phase change. Latent heat thermal energy storages are suitable for storing heat at a constant temperature and can be used for direct steam generation power plants. The calculation of the economic impact of an economically optimized thermal energy storage system, based on a latent heat thermal energy storage system with phase change material, is the main focus of the presented work. To reach that goal, a thermal energy storage system for a direct steam generation power plant with parabolic troughs in the solar field was thermally designed to determine the boundary conditions. This paper discusses the economic impact of the designed thermal energy storage system based on the levelized costs of electricity results, provided via a wide parametric study. A state-of-the-art power cycle with a primary and a secondary heat transfer fluid and a two-tank thermal energy storage is used as a benchmark technology for electricity generation with solar thermal energy. The benchmark and direct steam generation systems are compared to each other, based respectively

  10. Steam generators and furnaces

    Energy Technology Data Exchange (ETDEWEB)

    Swoboda, E

    1978-04-01

    The documents published in 1977 in the field of steam generators for conventional thermal power plants are classified according to the following subjects: power industry and number of power plants, planning and operation, design and construction, furnaces, environmental effects, dirt accumulation and corrosion, conservation and scouring, control and automation, fundamental research, and materials.

  11. Options for Steam Generator Decommissioning

    International Nuclear Information System (INIS)

    Krause, Gregor; Amcoff, Bjoern; Robinson, Joe

    2016-01-01

    Selecting the best option for decommissioning steam generators is a key consideration in preparing for decommissioning PWR nuclear power plants. Steam Generators represent a discrete waste stream of large, complex items that can lend themselves to a variety of options for handling, treatment, recycling and disposal. Studsvik has significant experience in processing full size Steam Generators at its metal recycling facility in Sweden, and this paper will introduce the Studsvik steam generator treatment concept and the results achieved to date across a number of projects. The paper will outline the important parameters needed at an early stage to assess options and to help consider the balance between off-site and on-site treatment solutions, and the role of prior decontamination techniques. The paper also outlines the use of feasibility studies and demonstration projects that have been used to help customers prepare for decommissioning. The paper discusses physical, radiological and operational history data, Pro and Contra factors for on- and off-site treatment, the role of chemical decontamination prior to treatment, planning for off-site shipments as well as Studsvik experience This paper has an original focus upon the coming challenges of steam generator decommissioning and potential external treatment capacity constraints in the medium term. It also focuses on the potential during operations or initial shut-down to develop robust plans for steam generator management. (authors)

  12. Development of knowledge-based operator support system for steam generator water leak events in FBR plants

    International Nuclear Information System (INIS)

    Arikawa, Hiroshi; Ida, Toshio; Matsumoto, Hiroyuki; Kishida, Masako

    1991-01-01

    A knowledge engineering approach to operation support system would be useful in maintaining safe and steady operation in nuclear plants. This paper describes a knowledge-based operation support system which assists the operators during steam generator water leak events in FBR plants. We have developed a real-time expert system. The expert system adopts hierarchical knowledge representation corresponding to the 'plant abnormality model'. A technique of signal validation which uses knowledge of symptom propagation are applied to diagnosis. In order to verify the knowledge base concerning steam generator water leak events in FBR plants, a simulator is linked to the expert system. It is revealed that diagnosis based on 'plant abnormality model' and signal validation using knowledge of symptom propagation could work successfully. Also, it is suggested that the expert system could be useful in supporting FBR plants operations. (author)

  13. Chemical-cleaning process evaluation: Westinghouse steam generators. Final report

    International Nuclear Information System (INIS)

    Cleary, W.F.; Gockley, G.B.

    1983-04-01

    The Steam Generator Owners Group (SGOG)/Electric Power Research Institute (EPRI) Steam Generator Secondary Side Chemical Cleaning Program, under develpment since 1978, has resulted in a generic process for the removal of accumulated corrosion products and tube deposits in the tube support plate crevices. The SGOG/EPRI Project S150-3 was established to obtain an evaluation of the generic process in regard to its applicability to Westinghouse steam generators. The results of the evaluation form the basis for recommendations for transferring the generic process to a plant specific application and identify chemical cleaning corrosion guidelines for the materials in Westinghouse Steam Generators. The results of the evaluation, recommendations for plant-specific applications and corrosion guidelines for chemical cleaning are presented in this report

  14. Steam generator tube fitness-for-service guidelines

    International Nuclear Information System (INIS)

    Gorman, J.A.; Harris, J.E.; Lowenstein, D.B.

    1995-07-01

    The objectives of this project were to characterize defect mechanisms which could affect the integrity of steam generator tubes, to review and critique state-of-the-art Canadian and international steam generator tube fitness-for-service criteria and guidelines, and to obtain recommendations for criteria that could be used to assess fitness-for service guidelines for steam generator tubes containing defects in Canadian power plant service. Degradation mechanisms, that could affect CANDU steam generator tubes in Canada, have been characterized. The design standards and safety criteria that apply to steam generator tubing in nuclear power plant service in Canada and in Belgium, France, Japan, Spain, Sweden, and the USA have been reviewed and described. The fitness-for-service guidelines used for a variety of specific defect types in Canada and internationally have been evaluated and described in detail in order to highlight the considerations involved in developing such defect specific guidelines. Existing procedures for defect assessment and disposition have been identified, including inspection and examination practices. The approaches used in Canada and in Belgium, France, Japan, Spain, Sweden, and the USA for fitness-for-service guidelines were compared and contrasted for a variety of defect mechanisms. The strengths and weaknesses of the various approaches have been assessed. The report presents recommendations on approaches that may be adopted in the development of fitness-for-service guidelines for use in the dispositioning of steam generator tubing defects in Canada. (author). 175 refs., 2 tabs., 28 figs

  15. Design and related R and D works of 'Monju' steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Nakai, Y; Imanaka, N; Hoshi, Y; Tanaka, K; Hori, M; Yoshikawa, Y

    1975-07-01

    The steam generator is considered to be one of the key components in LMFBR plant. Helical coil type steam generator is selected as a reference for the first Japanese demonstration plant 'MONJU'. The paper gives the structural and functional features of 'MONJU' steam generator together with a brief description of secondary cooling system. The related R and D works are also illustrated. (author)

  16. A study on the steam generator data base and the evaluation of chemical environment

    International Nuclear Information System (INIS)

    Yang, Kyung Rin; Yoo, Je Hyoo; Lee, Eun He; Hong, Kwang Pum

    1990-01-01

    In order to make steam generator data base, the basic plant information and water quality control data on the steam generators of the PWR nuclear power plant operating in the world have been collected by EPRI. In this project, the basic information and water quality control data of the domestic PWR nuclear power plants were collected to make steam generator data base on the basic of the EPRI format table, and the computerization of them was performed. Also, the technical evaluation of chemical environments on steam generator of the Kori 2 plant chemists. Workers and researchers working at the research institute and universities and so on. Especially, it is able to be used as a basic plant information in order to develop an artificial intellegence development system in the field on the technical development of the chemical environment. The scope and content of the project are following. The data base on the basic information data in domestic PWR plant. The steam generator data base on water quality control data. The evaluation on the chemical environment in the steam generators of the Kori 2 plant. From previous data, it is concluded as follows. The basic plant information on the domestic PWR power plant were computerized. The steam generator data base were made on the basis of EPRI format table. The chemical environment of the internal steam generators could be estimated from the analytical evaluation of water quality control data of the steam generator blowdown. (author)

  17. Detailed partial load investigation of a thermal energy storage concept for solar thermal power plants with direct steam generation

    Science.gov (United States)

    Seitz, M.; Hübner, S.; Johnson, M.

    2016-05-01

    Direct steam generation enables the implementation of a higher steam temperature for parabolic trough concentrated solar power plants. This leads to much better cycle efficiencies and lower electricity generating costs. For a flexible and more economic operation of such a power plant, it is necessary to develop thermal energy storage systems for the extension of the production time of the power plant. In the case of steam as the heat transfer fluid, it is important to use a storage material that uses latent heat for the storage process. This leads to a minimum of exergy losses during the storage process. In the case of a concentrating solar power plant, superheated steam is needed during the discharging process. This steam cannot be superheated by the latent heat storage system. Therefore, a sensible molten salt storage system is used for this task. In contrast to the state-of-the-art thermal energy storages within the concentrating solar power area of application, a storage system for a direct steam generation plant consists of a latent and a sensible storage part. Thus far, no partial load behaviors of sensible and latent heat storage systems have been analyzed in detail. In this work, an optimized fin structure was developed in order to minimize the costs of the latent heat storage. A complete system simulation of the power plant process, including the solar field, power block and sensible and latent heat energy storage calculates the interaction between the solar field, the power block and the thermal energy storage system.

  18. Steam Generator Tube Integrity Program: Surry Steam Generator Project, Hanford site, Richland, Benton County, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1980-03-01

    The US Nuclear Regulatory Commission (NRC) has placed a Nuclear Regulatory Research Order with the Richland Operations Office of the US Department of Energy (DOE) for expanded investigations at the DOE Pacific Northwest Laboratory (PNL) related to defective pressurized water reactor (PWR) steam generator tubing. This program, the Steam Generator Tube Integrity (SGTI) program, is sponsored by the Metallurgy and Materials Research Branch of the NRC Division of Reactor Safety Research. This research and testing program includes an additional task requiring extensive investigation of a degraded, out-of-service steam generator from a commercial nuclear power plant. This comprehensive testing program on an out-of-service generator will provide NRC with timely and valuable information related to pressurized water reactor primary system integrity and degradation with time. This report presents the environmental assessment of the removal, transport, and testing of the steam generator along with decontamination/decommissioning plans

  19. HTGR power plant hot reheat steam pressure control system

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegtnes, K.O.

    1975-01-01

    A control system for a high temperature gas cooled reactor (HTGR) power plant is disclosed wherein such plant includes a plurality of steam generators. Dual turbine-generators are connected to the common steam headers, a high pressure element of each turbine receiving steam from the main steam header, and an intermediate-low pressure element of each turbine receiving steam from the hot reheat header. Associated with each high pressure element is a bypass line connected between the main steam header and a cold reheat header, which is commonly connected to the high pressure element exhausts. A control system governs the flow of steam through the first and second bypass lines to provide for a desired minimum steam flow through the steam generator reheater sections at times when the total steam flow through the turbines is less than such minimum, and to regulate the hot reheat header steam pressure to improve control of the auxiliary steam turbines and thereby improve control of the reactor coolant gas flow, particularly following a turbine trip. (U.S.)

  20. Steam generator replacement: a story of continuous improvement

    International Nuclear Information System (INIS)

    Sills, M.S.; Wilkerson, R.

    2009-01-01

    This paper provides a review of the history of steam generator replacement in the US focusing on the last five years. From the early replacements in the 1980s, there have been major technology improvements resulting in dramatically shorter outages and reduced radiological exposure for workers. Even though the changes for the last five years have been less dramatic, the improvement trend continues. No two steam generator replacement (SGR) projects are the same and there are some major differences including; the access path for the components to containment (is a construction opening in containment required), type of containment, number of steam generators, one piece or two piece replacement, plant type (Westinghouse, CE or B and W) and plant layout. These differences along with other variables such as delays due to plant operations and other activities not related to the steam generator replacement make analysis of performance data difficult. However, trends in outage performance and owner expectations can be identified. How far this trend will go is also discussed. Along with the trend of improved performance, there is also a significant variation in performance. Some of the contributors to this variation are identified. This paper addresses what is required for a successful outage, meeting the increasing expectations and setting new records. The authors will discuss various factors that contribute to the success of a steam generator replacement. These factors include technical issues and, equally important, organizational interface and the role the customer plays. Recommendations are provided for planning a successful steam generator replacement outage. (author)

  1. 3D model of steam generator of nuclear power plant Krsko

    International Nuclear Information System (INIS)

    Ravnikar, I.; Petelin, S.

    1995-01-01

    The Westinghouse Electric Corporation D4 steam generator design was analyzed from a thermal-hydraulic point of view using the 3D PHOENICS computer code. Void fraction, velocity and enthalpy distributions were obtained in the U-tube riser. The boundary conditions of primary side were provided by SMUP 1D code. The calculations were carried out for present operating conditions of nuclear power plant Krsko. (author)

  2. Study on steam separation in steam generators of a NPP with the WWER-440 reactors

    International Nuclear Information System (INIS)

    Dmitriev, A.I.; Kolzov, Yu.V.; Titov, V.F.; Dubrovin, A.V.; Ilyushin, V.F.; Volkov, A.P.

    1977-01-01

    The separation characteristics as well as the actual level position in steam generators with and without a submerged holy sheet have been determined at a WWER-440 reactor nuclear power plant. It has been shown, that without changing the design of steam generators their load at the WWER-440 reactor nuclear power plant can be increased by about 10%. In this case the vapour humidity does not exceed the permissible value equal to 0.25%. The submerged holy sheet considerably decreases load irregularity and swelling of the water-steam mixture layer

  3. Characteristics of U-tube assembly design for CANDU 6 type steam generators

    International Nuclear Information System (INIS)

    Park, Jun Su; Jeong, Seung Ha

    1996-06-01

    Since the first operation of nuclear steam generator early 1960s, its performance requirements have been met but the steam generator problems have been met but the steam generator problems have been major cause of reducing the operational reliability, plant safety and availability. U-tube assembly of steam generator forms the primary system pressure boundary of the plant and have experienced several types of tube degradation problems. Tube failure and leakage resulting from the degradation will cause radioactive contamination of secondary system by the primary coolant, and this may lead to unplanned plant outages and costly repair operations such as tube plugging or steam generator replacement. For the case of steam generators for heavy water reactors, e.g. Wolsong 2, 3, and 4 NPP, a high cost of heavy water will be imposed additionally. During the plant operation, steam generator tubes can potentially be subject to adverse environmental conditions which will cause damages to U-tube assembly. Types of the damage depend upon the combined effects of design factors, materials and chemical environment of steam generator, and they are the pure water stress corrosion cracking, intergranular attack, pitting, wastage, denting, fretting and fatigue, etc. In this report, a comprehensive review of major design factors of recirculating steam generators has been performed against the potential tube damages. Then the design characteristics of CANDU-type Wolsong steam generator were investigated in detail, including tube material, thermalhydraulic aspects, tube-to-tubesheet joint, tube supports, water chemistry and sludge management. 9 tabs., 18 figs., 38 refs. (Author) .new

  4. Report on US-Japan 1983 meetings on steam generators

    International Nuclear Information System (INIS)

    1984-04-01

    This is a report on a trip to Japan by personnel of the US Nuclear Regulatory Commission in 1983 to exchange information on steam generators of nuclear power plants. Steam generators of Japanese pressurized water reactors have experienced nearly all of the forms of degradation that have been experienced in US recirculating-type steam generators, except for denting and pitting. More tubes have been plugged per year of reactor operation in Japanese than in US steam generators, but much of the Japanese tube plugging is preventative rather than the result of leaks experienced. The number of leaks per reactor year is much smaller for Japanese than for US steam generators. No steam generators have been replaced in Japan while several have been replaced in the US. The Japanese experience may be related to their very stringent inspection and maintenance programs for steam generators

  5. A connection of the steam generator feedwater section of WWER type nuclear power plants

    International Nuclear Information System (INIS)

    Matal, O.; Sadilek, J.

    1989-01-01

    In the feedwater piping of each steam generator, a plate for additional water pressure reduction is inserted before the first closing valve. During a steady water flow, the plate gives rise to a constant hydraulic resistance, bringing about steady reduction of the feedwater pressure; this also contributes to a stabilization of the feedwater flow rate into the steam generator. The control valve thus is stressed by minimal hydrodynamic forces. In this manner its load is decreased, its vibrations are damped, and the frequency of failures - and thereby the frequency of the nuclear power plant unit outages -is reduced. (J.P.). 1 fig

  6. Changing the simualtor's steam generator

    International Nuclear Information System (INIS)

    Ruiz Martin, J.A.; Ortega Pascual, F.

    2006-01-01

    Two Spanish nuclear power plants (two PWR units each one) have planned to change their Westinghouse D-3 steam generators (SGo henceforth) for a new model, 61W/D3 from Siemens/KWU (SGn henceforth), during 1995/1997. This is the reason why TECNATOM has developed during 1994's last term, a new software for the full scope simulator that incorporates the modifications related to the steam generator substiution programme. This allows an anticipated training on the procedures, not only for normal, but for emergency procedures. As it is a component which has not yet been included in these plants, there are not real references or operative experience data. Therefore, the design of the validation strategy was one of the key points in this work. (author)

  7. Chemical cleaning of nuclear (PWR) steam generators

    International Nuclear Information System (INIS)

    Welty, C.S. Jr.; Mundis, J.A.

    1982-01-01

    This paper reports on a significant research program sponsored by a group of utilities (the Steam Generator Owners Group), which was undertaken to develop a process to chemically remove corrosion product deposits from the secondary side of pressurized water reactor (PWR) power plant steam generators. Results of this work have defined a process (solvent system and application methods) that is capable of removing sludge and tube-to-tube support plate crevice corrosion products generated during operation with all-volatile treatment (AVT) water chemistry. Considers a plant-specific test program that includes all materials in the steam generator to be cleaned and accounts for the physical locations (proximity and contact) of those materials. Points out that prior to applying the process in an operational unit, the utility, with the participation of the NSSR vendor, must define allowable total corrosion to the materials of construction of the unit

  8. Development project HTR-electricity-generating plant, concept design of an advanced high-temperature reactor steam cycle plant with spherical fuel elements (HTR-K)

    International Nuclear Information System (INIS)

    1978-07-01

    The report gives a survey of the principal work which was necessary to define the design criteria, to determine the main design data, and to design the principal reactor components for a large steam cycle plant. It is the objective of the development project to establish a concept design of an edvanced steam cycle plant with a pebble bed reactor to permit a comparison with the direct-cycle-plant and to reach a decision on the concept of a future high-temperature nuclear power plant. It is tried to establish a largerly uniform basic concept of the nuclear heat-generating systems for the electricity-generating and the process heat plant. (orig.) [de

  9. Evaluation on mechanical and corrosion properties of steam generator tubing materials

    International Nuclear Information System (INIS)

    Kim, In Sup; Lee, Byong Whi; Lee, Sang Kyu; Lee, Young Ho; Kim, Jun Whan; Lee, Ju Seok; Kwon, Hyuk Sang; Kim, Su Jung

    1998-06-01

    Steam generator is one of the major components of nuclear reactor pressure boundary. It's main function os transferring heat which generated in the reactor to turbine generator through steam generator tube. In these days, steam generator tubing materials of operating plant are used Inconel 600 alloys. But according to the operation time, there are many degradation phenomena which included mechanical damage due to flow induced vibration and corrosion damage due to PWSCC, IGA/SCC and pitting etc. Recently Inconel 690 alloys are selected as new and replacement steam generator tubes for domestic nuclear power plant. But there are few study about mechanical and corrosion properties of Inconel 600 and 690. The objectives of this study is to evaluate and compare mechanical and corrosion propertied of steam generator tube materials

  10. Evaluation on mechanical and corrosion properties of steam generator tubing materials

    Energy Technology Data Exchange (ETDEWEB)

    Kim, In Sup; Lee, Byong Whi; Lee, Sang Kyu; Lee, Young Ho; Kim, Jun Whan; Lee, Ju Seok; Kwon, Hyuk Sang; Kim, Su Jung [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    1998-06-15

    Steam generator is one of the major components of nuclear reactor pressure boundary. It's main function os transferring heat which generated in the reactor to turbine generator through steam generator tube. In these days, steam generator tubing materials of operating plant are used Inconel 600 alloys. But according to the operation time, there are many degradation phenomena which included mechanical damage due to flow induced vibration and corrosion damage due to PWSCC, IGA/SCC and pitting etc. Recently Inconel 690 alloys are selected as new and replacement steam generator tubes for domestic nuclear power plant. But there are few study about mechanical and corrosion properties of Inconel 600 and 690. The objectives of this study is to evaluate and compare mechanical and corrosion propertied of steam generator tube materials.

  11. Steam generator operating experience: Update for 1984-1986

    International Nuclear Information System (INIS)

    Frank, L.; Stokley, J.

    1988-06-01

    This report summarizes operational events and degradation mechanisms affecting pressurized water reactor steam generator integrity, provides updated inspection results reported in 1984, 1985, and 1986, and highlights both prevalent problem areas and advances in improved equipment test practices, preventive measures, repair techniques, and replacement procedures. It describes equipment design features of the three major suppliers and discusses 68 plants in detail. Steam generator degradation mechanisms include intergranular stress corrosion cracking, primary water stress corrosion cracking, pitting, intergranular attack, and vibration wear that effects tube integrity and causes leakage. Plugging, sleeving heat treatment, peening, chemical cleaning, and steam generator replacements are described and regulatory instruments and inspection guidelines for nondestructive evaluations and girth weld cracking are discusses. The report concludes that although degradation mechanisms are generally understood, the elimination of unscheduled plant shutdowns and costly repairs resulting from leaking tubes has not been achieved. Highlights of steam generator research and unresolved safety issues are discussed. 21 refs., 8 tabs

  12. Safety evaluation report related to steam generator repair at H.B. Robinson Steam Electric Plant, Unit No. 2. Docket No. 50-261

    International Nuclear Information System (INIS)

    1983-11-01

    A Safety Evaluation Report was prepared for the H.B. Robinson Steam Electric Plant Unit No. 2 by the Office of Nuclear Reactor Regulation. This report considers the safety aspects of the proposed steam generator repair at H.B. Robinson Steam Electric Plant Unit No. 2. The report focuses on the occupational radiation exposure associated with the proposed repair program. It concludes that there is reasonable assurance that the health and safety on the public will not be endangered by the conduct of the proposed action, such activities will be conducted in compliance with the Commission's regulations, and the issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public

  13. Impact of steam generator start-up limitations on the performance of a parabolic trough solar power plant

    DEFF Research Database (Denmark)

    Ferruzza, Davide; Topel, Monika; Laumert, Björn

    2018-01-01

    typically start-up and shut down every day, so in order to maximize their profitability, it is necessary to increase their flexibility in transient operation and to initiate power generation as rapidly as possible. Two of the key components are the steam generator and steam turbine and the rates at which...... they can reach operational speed are limited by thermo-mechanical constraints. This paper presents an analysis of the effects of the thermal stress limitations of the steam generator and steam turbine on the power plant start-up, and quantifies their impact on the economy of the system. A dynamic model......-driven and peak-load. The results indicate that for steam generator hot start-ups, a 1.5% increase in peak-load electricity production would be achieved by doubling the maximum allowable heating rate of the evaporator. No useful increase would be achieved by increasing the rates beyond a limit of 7–8 K...

  14. Condensate polisher application for PWR steam generator corrosion control

    International Nuclear Information System (INIS)

    Sawochka, S.G.; Leibovitz, J.; Siegwarth, D.P.; Pearl, W.L.

    1981-01-01

    The evolution of corrosion attack modes particularly in recirculating U-tube PWR steam generators has dictated a thorough review of the advantages and disadvantages of condensate polishing. Analytical modeling techniques to qualitatively predict crevice chemistry variations resulting from steam generator bulk water variations have allowed valuable insights to be developed. Modeling results complemented by steam generator and laboratory corrosion data will be employed to set condensate demineralizer effluent specifications consistent with control of steam generator corrosion. Laboratory and plant studies are being performed to demonstrate achievability of necessary effluent specifications. (author)

  15. Some engineering aspects of the steam generator system for the United States LMFBR demonstration plant

    International Nuclear Information System (INIS)

    Tippets, F.E.

    1975-01-01

    This paper describes the main design features of the steam generator system for the Clinch River Breeder Reactor Plant and the engineering approach being employed for some of the critical elements of this system, including in particular the sodium-steam/water boundary, the efforts to have this boundary be of highest integrity, and the system features to safely accommodate any failure of the boundary. (author)

  16. Some engineering aspects of the steam generator system for the United States LMFBR demonstration plant

    Energy Technology Data Exchange (ETDEWEB)

    Tippets, F E

    1975-07-01

    This paper describes the main design features of the steam generator system for the Clinch River Breeder Reactor Plant and the engineering approach being employed for some of the critical elements of this system, including in particular the sodium-steam/water boundary, the efforts to have this boundary be of highest integrity, and the system features to safely accommodate any failure of the boundary. (author)

  17. IAEA activities on steam generator life management

    International Nuclear Information System (INIS)

    Gueorguiev, B.; Lyssakov, V.; Trampus, P.

    2002-01-01

    The International Atomic Energy Agency (IAEA) carries out a set of activities in the field of Nuclear Power Plant (NPP) life management. Main activities within this area are implemented through the Technical Working Group on Life Management of NPPs, and mostly concentrated on studies of understanding mechanisms of degradation and their monitoring, optimisation of maintenance management, economic aspects, proven practices of and approaches to plant life management including decommissioning. The paper covers two ongoing activities related to steam generator life management: the International Database on NPP Steam Generators and the Co-ordinated Research Project on Verification of WWER Steam Generator Tube Integrity (WWER is the Russian designed PWR). The lifetime assessment of main components relies on an ability to assess their condition and predict future degradation trends, which to a large extent is dependent on the availability of relevant data. Effective management of ageing and degradation processes requires a large amount of data. Several years ago the IAEA started to work on the International Database on NPP Life Management. This is a multi-module database consisting of modules such as reactor pressure vessels materials, piping, steam generators, and concrete structures. At present the work on pressure vessel materials, on piping as well as on steam generator is completed. The paper will present the concept and structure of the steam generator module of the database. In countries operating WWER NPPs, there are big differences in the eddy current inspection strategy and practice as well as in the approach to steam generator heat exchanger tube structural integrity assessment. Responding to the need for a co-ordinated research to compare eddy current testing results with destructive testing using pulled out tubes from WWER steam generators, the IAEA launched this project. The main objectives of the project are to summarise the operating experiences of WWER

  18. 15 years steam generator experience in German PWR power plants; part II: replacement of two completely assembled steam generators within ten weeks

    International Nuclear Information System (INIS)

    Scheuktanz, G.; Bouecker, R.; Riess, R.; Soellner, P.; Stieding, L.; Termeuhlen, H.

    1984-01-01

    This paper reports on the replacement of two steam generators at the Obrigheim power plant during a 10-week period, including a description of the methods and equipment used to do so. It is concluded that the method should be used only if transportation conditions within the reactor building preclude a complete system exchange and that one of the main reasons for the success of this operation was the very close relationship established between plant personnel and the equipment supplier and contractor, a relationship which began when the project was in the planning stage

  19. Darlington steam generator life assurance program

    International Nuclear Information System (INIS)

    Jelinski, E.; Dymarski, M.; Maruska, C.; Cartar, E.

    1995-01-01

    The Darlington Nuclear Generating Station belonging to Ontario Hydro is one of the most modern and advanced nuclear generating stations in the world. Four reactor units each generate 881 net MW, enough to provide power to a major city, and representing approximately 20% of the Ontario grid. The nuclear generating capacity in Ontario represents approximately 60% of the grid. In order to look after this major asset, many proactive preventative and predictive maintenance programs are being put in place. The steam generators are a major component in any power plant. World wide experience shows that nuclear steam generators require specialized attention to ensure reliable operation over the station life. This paper describes the Darlington steam generator life assurance program in terms of degradation identification, monitoring and management. The requirements for chemistry control, surveillance of process parameters, surveillance of inspection parameters, and the integration of preventative and predictive maintenance programs such as water lancing, chemical cleaning, RIHT monitoring, and other diagnostics to enhance our understanding of life management issues are identified and discussed. We conclude that we have advanced proactive activities to avoid and to minimize many of the problems affecting other steam generators. An effective steam generator maintenance program must expand the knowledge horizon to understand life limiting processes and to analyze and synthesize observations with theory. (author)

  20. A Differential-Algebraic Model for the Once-Through Steam Generator of MHTGR-Based Multimodular Nuclear Plants

    Directory of Open Access Journals (Sweden)

    Zhe Dong

    2015-01-01

    Full Text Available Small modular reactors (SMRs are those fission reactors whose electrical output power is no more than 300 MWe. SMRs usually have the inherent safety feature that can be applicable to power plants of any desired power rating by applying the multimodular operation scheme. Due to its strong inherent safety feature, the modular high temperature gas-cooled reactor (MHTGR, which uses helium as coolant and graphite as moderator and structural material, is a typical SMR for building the next generation of nuclear plants (NGNPs. The once-through steam generator (OTSG is the basis of realizing the multimodular scheme, and modeling of the OTSG is meaningful to study the dynamic behavior of the multimodular plants and to design the operation and control strategy. In this paper, based upon the conservation laws of mass, energy, and momentum, a new differential-algebraic model for the OTSGs of the MHTGR-based multimodular nuclear plants is given. This newly-built model can describe the dynamic behavior of the OTSG in both the cases of providing superheated steam and generating saturated steam. Numerical simulation results show the feasibility and satisfactory performance of this model. Moreover, this model has been applied to develop the real-time simulation software for the operation and regulation features of the world first underconstructed MHTGR-based commercial nuclear plant—HTR-PM.

  1. Certification of materials for steam generator condensor and regeneration heat exchanger for nuclear plant

    International Nuclear Information System (INIS)

    Stevanovicj, M.V.; Jovashevicj, V.J.; Jovashevicj, V.D.J.; Spasicj, Zh.Lj.

    1977-01-01

    In the construction of a nuclear power plant almost all known materials are used. The choice depends on working conditions. In this work standard specifications of contemporary materials that take part in larger quantities in the following components of the secondary circuit of PWR-type nuclear power plant are proposed: steam generator with moisture separator, condensor and regenerative heat eXchanger

  2. Steam generation at Rihand STPP Stage 1

    Energy Technology Data Exchange (ETDEWEB)

    1987-12-01

    The steam generation plant at Rihand in India has two 500 MW boilers. The boilers are of the balanced draught, single cell, radiant furnace type, and are controlled automatically. Cochran Thermax shell type auxillary steam boilers are used for preheating air to the main boilers and for heating fuel oil during storage and pumping. Electrostatic precipitators and ash handling plants are provided to keep dust and ash within limits. 2 figs.

  3. Optimal sampling period of the digital control system for the nuclear power plant steam generator water level control

    International Nuclear Information System (INIS)

    Hur, Woo Sung; Seong, Poong Hyun

    1995-01-01

    A great effort has been made to improve the nuclear plant control system by use of digital technologies and a long term schedule for the control system upgrade has been prepared with an aim to implementation in the next generation nuclear plants. In case of digital control system, it is important to decide the sampling period for analysis and design of the system, because the performance and the stability of a digital control system depend on the value of the sampling period of the digital control system. There is, however, currently no systematic method used universally for determining the sampling period of the digital control system. Generally, a traditional way to select the sampling frequency is to use 20 to 30 times the bandwidth of the analog control system which has the same system configuration and parameters as the digital one. In this paper, a new method to select the sampling period is suggested which takes into account of the performance as well as the stability of the digital control system. By use of the Irving's model steam generator, the optimal sampling period of an assumptive digital control system for steam generator level control is estimated and is actually verified in the digital control simulation system for Kori-2 nuclear power plant steam generator level control. Consequently, we conclude the optimal sampling period of the digital control system for Kori-2 nuclear power plant steam generator level control is 1 second for all power ranges. 7 figs., 3 tabs., 8 refs. (Author)

  4. Transient analysis of a U-tube natural circulation steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Gaikwad, A J; Kumar, Rajesh; Bhadra, Anu; Chakraborty, G; Venkat Raj, V [Reactor Safety Division, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    A computer code has been developed, for transient thermal-hydraulic analysis of proposed 500 MWe PHWR steam generator. The transient behaviour of a nuclear power plant is very much dependent on the steam generator performance, as it provides a thermal linkage between the primary and secondary systems. Study of dynamics of steam generator is essential for over all power plant dynamics as well as design of control systems for steam generator. A mathematical model has been developed for the simulation of thermal-hydraulic phenomena in a U tube natural circulation steam generator. Fluid model is based on one dimensional, nonlinear, single fluid conservation equations of mass, momentum, energy and equation of state. This model includes coupled two phase flow heat transfer and natural circulation. The model accounts for both compressibility and thermal expansion effects. The process simulation and results obtained for transients such as step change in load and total loss of feed water are presented. (author). 5 refs., 7 figs.

  5. Overview of the United States steam generator development programs

    Energy Technology Data Exchange (ETDEWEB)

    Kaspar, P W; Lowe, P A

    1975-07-01

    The LMFBR steam generator development program of the USA was initiated to support the development of reliable designs and meaningful performance data for these critical components. Since the steam generators include the structural boundary between heated sodium and water, the consequences of small flaws in the materials that form the boundary are significant. Successful development and demonstration of commercial LMFBR power plants requires the consideration of many factors in addition to the design, construction and operation of a particular plant. Additional factors which must be assessed include: economics, reliability, safety, environment, operability, maintainability and conservation of the resources. In terms of the steam generator these items led to the selection of a single wall tube design using a forced recirculating system for the present Clinch River Breeder Reactor. There are strong economic incentives to use a once-through steam generating system in future designs.

  6. Steam and sodium leak simulation in a fluidized-bed steam generator

    International Nuclear Information System (INIS)

    Vaux, W.G.; Keeton, A.R.; Keairns, D.L.

    1977-01-01

    A fluidized-bed steam generator for the liquid metal fast breeder reactor enhances plant availability and minimizes the probability of a water/sodium reaction. An experimental test program was conceived to assess design criteria and fluidized-bed operation under conditions of water, steam, and sodium leaks. Sodium, steam, and water were leaked into helium-fluidized beds of metal and ceramic particles at 900 F. Test results show the effects of leaks on the heat transfer coefficient, quality of fluidization, leak detection, and cleanup procedures

  7. Steam generator development in France for the Super Phenix project

    International Nuclear Information System (INIS)

    Robin, M.G.

    1975-01-01

    'Steam Generator Development for Super Phenix Project'. The development program of steam generators studied by Fives-Cail Babcock and Stein Industrie Companies, jointly with CEA end EDF, for the Super Phenix 1200 MWe Fast Breeder Power Plant, is presented. The main characteristics of both sodium heated steam generators are emphasized and experimental studies related to their key features are reported. (author)

  8. Reevaluation of steam generator level trip set point

    Energy Technology Data Exchange (ETDEWEB)

    Shim, Yoon Sub; Soh, Dong Sub; Kim, Sung Oh; Jung, Se Won; Sung, Kang Sik; Lee, Joon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-06-01

    The reactor trip by the low level of steam generator water accounts for a substantial portion of reactor scrams in a nuclear plant and the feasibility of modification of the steam generator water level trip system of YGN 1/2 was evaluated in this study. The study revealed removal of the reactor trip function from the SG water level trip system is not possible because of plant safety but relaxation of the trip set point by 9 % is feasible. The set point relaxation requires drilling of new holes for level measurement to operating steam generators. Characteristics of negative neutron flux rate trip and reactor trip were also reviewed as an additional work. Since the purpose of the trip system modification for reduction of a reactor scram frequency is not to satisfy legal requirements but to improve plant performance and the modification yields positive and negative aspects, the decision of actual modification needs to be made based on the results of this study and also the policy of a plant owner. 37 figs, 6 tabs, 14 refs. (Author).

  9. Model studies of the vertical steam generator thermal-hydraulic characteristics

    International Nuclear Information System (INIS)

    Desyatun, V.F.; Moskvichev, V.F.; Ulasov, V.M.; Morozov, V.G.; Burkov, V.K.; Grebennikov, V.N.

    1984-01-01

    Results of investigations conducted to clarify the calculation technique and to test the workability of the main elements and units of the PGV-250 vertical steam generator of saturated steam are considered. The steam generating capacity of the plant is 1486 t/h, thermal power is 792 MW. Steam generation follows a multiple circulation scheme. The heat surface comprises 330-shields. The investigations are carried out with a model which reproduces all the main elements of the steam generator xcluding the economizer section. The flow rates of feed water, generated steam and coolant of the first circuit as well as temperature, pressure and humidity of the generated steam past the separator are determined. The average heat transfer factors of the heat surface are calculated on the base of the data obtained and a conclusion is drawn on the correctness of the thermohydraulic calculation technique used in development of the PGV-250 steam generator design. Temperature pulsations and heat surface steaming are not observed. The steam humidity at the outlet and steam capture into sinking tubes are within permissible values

  10. Steam generator life management

    International Nuclear Information System (INIS)

    King, P.; McGillivray, R.; Reinhardt, W.; Millman, J.; King, B.; Schneider, W.

    2003-01-01

    'Full-Text:' Steam Generator Life Management responsibility embodies doing whatever is necessary to maintain the steam generation equipment of a nuclear plant in effective, reliable service. All comes together in that most critical deliverable, namely the submission of the documentation which wins approval for return to service after an outage program. Life management must address all aspects of SG reliability over the life of the plant. Nevertheless, the life management activities leading up to return to service approval is where all of it converges. Steam Generator Life Management activities entail four types of work, all equally important in supporting the objective of successful operation. These activities are i) engineering functions; including identification of inspection and maintenance requirements, outage planning and scope definition plus engineering assessment, design and analysis as necessary to support equipment operation, ii) fitness of service work; including the expert evaluation of degradation mechanisms, disposition of defects for return to service or not, and the fitness for service analysis as required to justify ongoing operation with acceptable defects, iii) inspection work; including large scale eddy current inspection of tubing, the definition of defect size and character, code inspections of pressure vessel integrity and visual inspections for integrity and iv) maintenance work; including repairs, retrofits, cleaning and modifications, all as necessary to implement the measures defined during activities i) through iii). The paper discusses the approach and execution of the program for the achievement of the above objectives and particularly of items i) and ii). (author)

  11. Modelling of a Coil Steam Generator for CSP applications

    DEFF Research Database (Denmark)

    Pelagotti, Leonardo; Sørensen, Kim; Condra, Thomas Joseph

    2014-01-01

    The project investigates a new design for a CSP plant steam generation system, the Coil Steam Generator (CSG). This system allows faster start-ups and therefore higher daily energy production from the Sun. An analytical thermodynamic simulation model of the evaporator and a mechanical analysis...

  12. Thermal-hydraulic characteristic of the PGV-1000 steam generator

    International Nuclear Information System (INIS)

    Ubra, O.; Doubek, M.

    1995-01-01

    Horizontal steam generators are typical parts of nuclear power plants with pressure water reactor type VVER. By means of this computer program, a detailed thermal-hydraulic study of the horizontal steam generator PGV-1000 has been carried out and a special attention has been paid to the thermal-hydraulics of the secondary side. A set of important steam generator characteristics has been obtained and analyzed. Some of the interesting results of the analysis are presented in the paper. (author)

  13. Advanced life-cycle management for an increased steam generator performance

    International Nuclear Information System (INIS)

    Beck, J.; Schwarz, T.; Bouecke, R.; Schneider, V.

    2006-01-01

    High steam generators performance is a prerequisite for high plant availability and possible life time extension. During operation, the performance is reduced by fouling of the heating tubes and by corrosion, resulting on a reduction of the heat-exchange area. Such steam generator degradation problems arise from mechanical degradation and a continuous ingress of non-volatile contaminants, i.e. corrosion products and salt impurities accumulated in the steam generators. In addition, the tube scales in general affect the steam generator thermal performance, which ultimately cause a reduction of power output. AREVA applied an integrated service for utilities to evaluate all operational parameters influencing the steam generator performance. The evaluation is assisted by a systematic approach to evaluate the major steam generator operational data. The different data are structured and indexed in a Cleanling-Matrix. The result of this matrix is a quantified, dimensionless figure, given as the Fouling Index. The Fouling Index allows to monitor the condition of steam generators, compare it to other plants and, in combination with a life-time management applied at several German utilities, it allows verified statements on the past operation. Based on these data, an extrapolation of the potential additional life-time of the component is possible. As such, the Fouling Index is a valuable tool concerning life-time extension considerations. The application of the cleanliness criteria in combination with operational data with respect to life-time monitoring and improvements of steam generator performance are presented. (author)

  14. Optimum fuel allocation in parallel steam generator systems

    International Nuclear Information System (INIS)

    Bollettini, U.; Cangioli, E.; Cerri, G.; Rome Univ. 'La Sapienza'; Trento Univ.

    1991-01-01

    An optimization procedure was developed to allocate fuels into parallel steam generators. The procedure takes into account the level of performance deterioration connected with the loading history (fossil fuel allocation and maintenance) of each steam generator. The optimization objective function is the system hourly cost, overall steam demand being satisfied. Costs are due to fuel and electric power supply and to plant depreciation and maintenance as well. In order to easily updata the state of each steam generator, particular care was put in the general formulation of the steam production function by adopting a special efficiency-load curve description based on a deterioration scaling parameter. The influence of the characteristic time interval length on the optimum operation result is investigated. A special implementation of the method based on minimum cost paths is suggested

  15. Modernization of the Nuclear Power Plant Krsko with new steam generators

    International Nuclear Information System (INIS)

    Holz, R.; Stach, U.; Gloaguen, C.

    2000-01-01

    The contract for the replacement of two steam generators at NPP Krsko was awarded in February 1998 to the Consortium SIEMENS AG FRAMATOME S.A.. The time frame for the replacement outage was scheduled from April to June 2000. The replacement itself started with the plant shut down on 15 th of April 2000 and the plant was back on line on 15 th of June, so that after an intensive engineering period of more than two years the plant was off line only 62 days, as scheduled. This document deals with the various aspects of the replacement phase itself and the techniques used. During the last years conference the engineering and licensing phase of the project have been presented. (author)

  16. Modernization of the Nuclear Power Plant Krsko with new steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Holz, R; Stach, U [Siemens AG, Erlangen, Offenbach (Germany); Gloaguen, C [Framatome, Paris (France)

    2000-07-01

    The contract for the replacement of two steam generators at NPP Krsko was awarded in February 1998 to the Consortium SIEMENS AG FRAMATOME S.A.. The time frame for the replacement outage was scheduled from April to June 2000. The replacement itself started with the plant shut down on 15{sup th} of April 2000 and the plant was back on line on 15{sup th} of June, so that after an intensive engineering period of more than two years the plant was off line only 62 days, as scheduled. This document deals with the various aspects of the replacement phase itself and the techniques used. During the last years conference the engineering and licensing phase of the project have been presented. (author)

  17. Status of steam generator tubing integrity at Jaslovske Bohunice NPP

    International Nuclear Information System (INIS)

    Cepcek, S.

    1997-01-01

    Steam generator represents one of the most important component of nuclear power plants. Especially, loss of tubing integrity of steam generators can lead to the primary coolant leak to secondary circuit and in worse cases to the unit shut down or to the PTS events occurrence. Therefore, to ensure the steam generator tubing integrity and the current knowledge about tube degradation propagation and development is of the highest importance. In this paper the present status of steam generator tubing integrity in operated NPP in Slovak Republic is presented

  18. Model and control scheme for recirculation mode direct steam generation parabolic trough solar power plants

    International Nuclear Information System (INIS)

    Guo, Su; Liu, Deyou; Chen, Xingying; Chu, Yinghao; Xu, Chang; Liu, Qunming; Zhou, Ling

    2017-01-01

    Highlights: •A nonlinear dynamic model of recirculation DSG parabolic trough is developed. •Collector row, water separator and spray attemperator are modeled, respectively. •The dynamic behaviors of the collector field are simulated and analyzed. •Transfer functions of water level and outlet fluid temperature are derived. •Multi-model switching generalized predictive control strategy is developed. -- Abstract: This work describes and evaluates a new nonlinear dynamic model, and a new generalized predictive control scheme for a collector field of direct steam generation parabolic troughs in recirculation mode. Modeling the dynamic behaviors of collector fields is essential to design, testing and validation of automatic control systems for direct steam generation parabolic troughs. However, the behaviors of two-phase heat transfer fluids impose challenges to simulating and developing process control schemes. In this work, a new nonlinear dynamic model is proposed, based on the nonlinear distributed parameter and the nonlinear lumped parameter methods. The proposed model is used to simulate and analyze the dynamic behaviors of the entire collector field for recirculation mode direct steam generation parabolic troughs under different weather conditions, without excessive computational costs. Based on the proposed model, transfer functions for both the water level of the separator and outlet steam temperatures are derived, and a new multi-model switching generalized predictive control scheme is developed for simulated control of the plant behaviors for a wide region of operational conditions. The proposed control scheme achieves excellent control performance and robustness for systems with long delay, large inertia and time-varying parameters, and efficiently solves the model mismatching problem in direct steam generation parabolic troughs. The performances of the model and control scheme are validated with design data from the project of Integration of Direct

  19. Recent technology for nuclear steam turbine-generator units

    International Nuclear Information System (INIS)

    Moriya, Shin-ichi; Kuwashima, Hidesumi; Ueno, Takeshi; Ooi, Masao

    1988-01-01

    As the next nuclear power plants subsequent to the present 1,100 MWe plants, the technical development of ABWRs was completed, and the plan for constructing the actual plants is advanced. As for the steam turbine and generator facilities of 1,350 MWe output applied to these plants, the TC6F-52 type steam turbines using 52 in long blades, moisture separation heaters, butterfly type intermediate valves, feed heater drain pumping-up system and other new technologies for increasing the capacity and improving the thermal efficiency were adopted. In this paper, the outline of the main technologies of those and the state of examination when those are applied to the actual plants are described. As to the technical fields of the steam turbine system for ABWRs, the improvement of the total technologies of the plants was promoted, aiming at the good economical efficiency, reliability and thermal efficiency of the whole facilities, not only the main turbines. The basic specification of the steam turbine facilities for 50 Hz ABWR plants and the main new technologies applied to the turbines are shown. The development of 52 in long last stage blades, the development of the analysis program for the coupled vibration of the large rotor system, the development of moisture separation heaters, the turbine control system, condensate and feed water system, and the generators are described. (Kako, I.)

  20. Failure analysis of retired steam generator tubings

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Pyo; Kim, J. S.; Hwang, S. S. and others

    2005-04-15

    Degradation of steam generator leads to forced outage and extension of outage, which causes increase in repair cost, cost of purchasing replacement power and radiation exposure of workers. Steam generator tube rupture incident occurred in Uljin 4 in 2002, which made public sensitive to nuclear power plant. To keep nuclear energy as a main energy source, integrity of steam generator should be demonstrated. Quantitative relationship between ECT(eddy current test) signal and crack size is needed in assesment of integrity of steam generator in pressurized water reactor. However, it is not fully established for application in industry. Retired steam generator of Kori 1 has many kinds of crack such as circumferential and axial primary water stress corrosion crack and outer diameter stress corrosion crack(ODSCC). So, it can be used in qualifying and improving ECT technology and in condition monitoring assesment for crack detected in ISI(in service inspection). In addition, examination of pulled tube of Kori 1 retired steam generator will give information about effectiveness of non welded sleeving technology which was employed to repair defect tubes and remedial action which was applied to mitigate ODSCC. In this project, hardware such as semi hot lab. for pulled tube examination and modification transportation cask for pulled tube and software such as procedure of transportation of radioactive steam generator tube and non-destructive and destructive examination of pulled tube were established. Non-destructive and destructive examination of pulled tubes from Kori 1 retired steam generator were performed in semi hot lab. Remedial actions applied to Kori 1 retired steam generator, PWSCC trend and bulk water chemistry and crevice chemistry in Kori 1 were evaluated. Electrochemical decontamination technology for pulled tube was developed to reduce radiation exposure and enhance effectiveness of pulled tube examination. Multiparameter algorithm developed at ANL, USA was

  1. Draft environmental statement related to steam generator repair at H.B. Robinson Steam Electric Plant Unit No. 2, (Docket No. 50-261)

    International Nuclear Information System (INIS)

    1983-09-01

    The staff has considered the environmental impacts and economic costs of the proposed steam generator repair at the H.B. Robinson Steam Electric Plant Unit No. 2 along with reasonable alternatives to the proposed action. The staff has concluded that the proposed repair will not significantly affect the quality of the human environment and that there are no preferable alternatives to the proposed action. Furthermore, any impacts from the repair program are outweighted by its benefits

  2. AGE RELATED DEGRADATION OF STEAM GENERATOR INTERNALS BASED ON INDUSTRY RESPONSES TO GENERIC LETTER 97-06

    International Nuclear Information System (INIS)

    SUBUDHI, M.; SULLIVAN, JR. E.J.

    2002-01-01

    THIS PAPER PRESENTS THE RESULTS OF AN AGING ASSESSMENT OF THE NUCLEAR POWER INDUSTRY RESPONSES TO NRC GENERIC LETTER 97-06 ON THE DEGRADATION OF STEAM GENERATOR INTERNALS EXPERIENCED AT ELECTRICITE DE FRANCE (EDF) PLANTS IN FRANCE AND AT A UNITED STATES PRESSURIZED WATER REACTOR (PWR). WESTINGHOUSE (W), COMBUSTION ENGINEERING (CE), AND BABCOCK AND WILCOX (BW) STEAM GENERATOR MODELS, CURRENTLY IN SERVICE AT U.S. NUCLEAR POWER PLANTS, POTENTIALLY COULD EXPERIENCE DEGRADATION SIMILAR TO THATFOUND AT EDF PLANTS AND THE U.S. PLANT. THE STEAM GENERATORS IN MANY OF THE U.S. PWRS HAVE BEEN REPLACED WITH STEAM GENERATORS WITH STEAM GENERATORS WITH IMPROVED DESIGNS AND MATERIALS. THESE REPLACEMENT STEAM GENERATORS HAVE BEEN MANUFACTURED IN THE U.S. AND ABROAD. DURING THIS ASSESSMENT, EACH OF THE THREE OWNERS GROUPS (W,CE, AND BW) IDENTIFIED FOR ITS STEAM GENERATOR, MODELS ALL THE POTENTIAL INTERNAL COMPONENTS THAT ARE VULNERABLE TO DEGRADATION WHILE IN SERVICE. EACH OWNERS GROUPDEVELOPED INSPEC TION AND MONITORING GUIDANCE AND RECOMMENDATIONS FOR ITS PARTICULAR STEAM GENERATOR MODELS. THE NUCLEAR ENERGY INSTITUTE INCORPORATED IN NEI 97-06 STEAM GENERATOR PROGRAM GUIDELINES, A REQUIREMENT TO MONITOR SECONDARY SIDE STEAM GENERATOR COMPONENTS IF THEIR FAILURE COULD PREVENT THE STEAM GENERATOR FROM FULFILLING ITS INTENDED SAFETY-RELATED FUNCTION. LICENSEES INDICATED THAT THEY IMPLEMENTED OR PLANNED TO IMPLEMENT, AS APPROPRIATE FOR THEIR STEAM GENERATORS, THEIR OWNERS GROUPRECOMMENDATIONS TO ADDRESS THE LONG-TERM EFFECTS OF THE POTENTIAL DEGRADATION MECHANISMS ASSOCIATED WITH THE STEAM GENERATOR INTERNALS

  3. Research perspectives on the evaluation of steam generator tube integrity

    International Nuclear Information System (INIS)

    Muscara, J.; Diercks, D. R.; Majumdar, S.; Kupperman, D. S.; Bakhtiari, S.; Shack, W. J.

    2001-01-01

    Industry effects have been largely successful in managing degradation of steam generator tubes due to wastage, pitting, and denting, but fretting, SCC and intergranular attack have proved more difficult to manage. Although steam generator replacements are proceeding there is substantial industry interest in operating with degraded steam generators, and significant numbers of plants will continue to do so. In most cases degradation of steam generator tubing by stress corrosion cracking is still managed by plug or repair on detection, because current NDE techniques for characterization of flaws are not accurate enough to permit continued operation. This paper reviews some of the historical background that underlies current steam generator degradation management strategies and outlines some of the additional research that must be done to provide more effective management of degradation in current generators and provide greater assurance of satisfactory performance in replacement steam generators

  4. Steam generator design for solar towers using solar salt as heat transfer fluid

    Science.gov (United States)

    González-Gómez, Pedro Ángel; Petrakopoulou, Fontina; Briongos, Javier Villa; Santana, Domingo

    2017-06-01

    Since the operation of a concentrating solar power plant depends on the intermittent character of solar energy, the steam generator is subject to daily start-ups, stops and load variations. Faster start-up and load changes increase the plant flexibility and the daily energy production. However, it involves high thermal stresses on thick-walled components. Continuous operational conditions may eventually lead to a material failure. For these reasons, it is important to evaluate the transient behavior of the proposed designs in order to assure the reliability. The aim of this work is to analyze different steam generator designs for solar power tower plants using molten salt as heat transfer fluid. A conceptual steam generator design is proposed and associated heat transfer areas and steam drum size are calculated. Then, dynamic models for the main parts of the steam generator are developed to represent its transient performance. A temperature change rate that ensures safe hot start-up conditions is studied for the molten salt. The thermal stress evolution on the steam drum is calculated as key component of the steam generator.

  5. Steam generator

    International Nuclear Information System (INIS)

    Fenet, J.-C.

    1980-01-01

    Steam generator particularly intended for use in the coolant system of a pressurized water reactor for vaporizing a secondary liquid, generally water, by the primary cooling liquid of the reactor and comprising special arrangements for drying the steam before it leaves the generator [fr

  6. Wear behavior of steam generator tubes in nuclear power plant operating condition

    International Nuclear Information System (INIS)

    Kim, In-Sup; Hong, Jin-Ki; Kim, Hyung-Nam; Jang, Ki-Sang

    2003-01-01

    Reciprocating sliding wear tests were performed on steam generator tubes materials at steam generator operating temperature. The material surfaces react with oxygen to form oxides. The oxide properties such as formation rate and mechanical properties are varied with the test temperature and alloy composition. So, it is important to investigate the wear properties of each steam generator tube materials in steam generator operating condition. The tests results indicated that the wear coefficient in work rate model of alloy 690 was faster than that of alloy 800. From the scanning electron microscopy observation, the wear scars were similar each other and worn surfaces were covered with oxide layers. It seemed that the oxide layers were formed by wear debris sintering or cold welding and these layer properties affected the wear rate of steam generator tube materials. (author)

  7. Forming a cohesive steam generator maintenance strategy

    International Nuclear Information System (INIS)

    Poudroux, G.

    1991-01-01

    In older nuclear plants, steam generator tube bundles are the most fragile part of the reactor coolant system. Steam generator tubes are subject to numerous types of loading, which can lead to severe degradation (corrosion and wear phenomena). Preventive actions, such as reactor coolant temperature reduction or increasing the plugging limit and their associated analyses, can increase steam generator service life. Beyond these preventive actions, the number of affected tubes and the different locations of the degradations that occur often make repair campaigns necessary. Framatome has developed and qualified a wide range of treatment and repair processes. They enable careful management of the repair campaigns, to avoid reaching the maximum steam generator tube plugging limit, while optimizing the costs. Most of the available repair techniques allow a large number of affected tubes to be treated. Here we look only at those techniques that should be taken into account when defining a maintenance strategy. (author)

  8. Removal of secondary sludge from steam generators used in French 900 class nuclear power plants

    International Nuclear Information System (INIS)

    Lebouc, B.

    1982-09-01

    The objective is to remove magnetite deposits which have formed on a steam generator tubesheet during plant operation. The deposits are separated from the tubesheet by spraying water at high pressure (about 200 bar at lance nozzle outlets) on each tube bundle ligament, i.e. the spaces between steam generator tubes. The water is recovered in suction lines and then filtered in two seperate units. The residue obtained after settling is removed in the form of solid waste. This paper presents the sludge lancing technique (spray lances, sludge recovery, liquid waste, cooling). A typical operating sequence is detailed (duration, personnel). Specifications for the equipment used are given

  9. Steam plant for pressurized water reactors

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    This book discusses the research and development organisations and users to highlight those aspects of the steam turbine and associated plant which are particularly related to the PWR system. The contents include: Characteristics of the steam system (including feed train, dump system and safety aspects); overall design aspects of high and half speed turbines; design aspects of the steam generator and seismic considerations; moisture separators and reheaters; feed pumps and their drives; water treatment; safety related valves; operational experience; availability and performance

  10. Procedure for generating steam and steam generator for operating said procedure

    International Nuclear Information System (INIS)

    Chlique, Bernard.

    1975-01-01

    This invention concerns the generation of steam by bringing the water to be vaporised into indirect thermal exchange relation with the heating steam which condenses when passing in series, along alternate routes, through bundles of tubes immersed in a vaporising chamber. A number of steam generators working on this principle already exist. The purpose of the invention is to modify the operating method of these steam generators by means of a special disposition making it possible to build a compact unit including an additional bundle of tubes heated by the condensates collected at the outlet of each bundle through which the heating steam passes [fr

  11. CASTOR - Advanced System for VVER Steam Generator Inspection

    International Nuclear Information System (INIS)

    Mateljak, Petar

    2014-01-01

    From the safety point of view, steam generator is a very important component of a nuclear power plant. Only a thin tube wall prevents leakage of radioactive material from the primary side into the environment. Therefore, it is very important to perform inspections in order to detect pipe damage and apply appropriate corrective actions during outage. Application of the nondestructive examination (NDE) technique, that can locate degradation and measure its size and orientation, is an integral part of nuclear power plant maintenance. The steam generator inspection system is consisted of remotely controlled manipulator, testing instrument and software for data acquisition and analysis. Recently, the inspection systems have evolved to a much higher level of automation, efficiency and reliability resulting in a lower cost and shorter outage time. Electronic components have become smaller and deal with more complex algorithms. These systems are very fast, precise, reliable and easy to handle. The whole inspection, from the planning, examination, data analysis and final report, is now a highly automated process, which makes inspection much easier and more reliable. This paper presents the new generation of INETEC's VVER steam generator inspection system as ultimate solution for steam generator inspection and repair. (author)

  12. Embalse steam generators - status in 2009

    International Nuclear Information System (INIS)

    Luna, P.; Yetisir, M.; Roy, S.; MacEacheron, R.

    2009-01-01

    The Embalse Nuclear Generating Station (ENGS) is a CANDU 6, a pressurized heavy water plant, with a net capacity of 648 MW. The primary heat transport system at Embalse includes four Steam Generators (SGs) manufactured by Babcock and Wilcox Canada (B and W). These steam generators are vertical recirculating heat exchangers with Incoloy 800 inverted U-tubes and an integral preheater. Embalse SGs performed very well until the late 1990s, when an increase in tube fretting was noticed in the U-bend region. In-service inspection in 2002 and 2004 confirmed that the cause of the tube fretting was flow accelerated corrosion (FAC) damage of scallop bar supports in the U-bend region. The straight leg tube support plates (TSPs) have also been degrading. Degradation was worst at the top support plates, and it was in the form of material loss on the cold leg. The hot leg TSPs were heavily fouled with deposits and flow areas were blocked. Visual inspections and subsequent studies showed that the cause of the TSP degradation was also FAC. The Embalse SGs have carbon steel supports that make them susceptible to FAC. To mitigate the effects of degraded tube support structures, three additional sets of anti-vibration bars were installed in the U-bend regions of all four steam generators in 2004. In 2007, an improved secondary-side chemistry specification was implemented to reduce the FAC rate and the hot leg TSPs was waterlanced. A root cause analysis and condition assessment was performed for the tube supports in 2007. Fitness for Service (FFS) evaluation was completed using the Canadian Industry Guidelines for steam generator tubes. The steam generators were returned to service and the plan has operated without another forced outage to date. The FAC degradation of the carbon steel U-bend tube support systems has had the most significant impact on the plant operation causing a number of forced outages. The discovery of the extent of TSP degradation and difficulties to repair TSPs

  13. Performance analysis of a Kalina cycle for a central receiver solar thermal power plant with direct steam generation

    International Nuclear Information System (INIS)

    Modi, Anish; Haglind, Fredrik

    2014-01-01

    Solar thermal power plants have attracted increasing interest in the past few years – with respect to both the design of the various plant components, and extending the operation hours by employing different types of storage systems. One approach to improve the overall plant efficiency is to use direct steam generation with water/steam as both the heat transfer fluid in the solar receivers and the cycle working fluid. This enables operating the plant with higher turbine inlet temperatures. Available literature suggests that it is feasible to use ammonia-water mixtures at high temperatures without corroding the equipment by using suitable additives with the mixture. The purpose of the study reported here was to investigate if there is any benefit of using a Kalina cycle for a direct steam generation, central receiver solar thermal power plant with high live steam temperature (450 °C) and pressure (over 100 bar). Thermodynamic performance of the Kalina cycle in terms of the plant exergy efficiency was evaluated and compared with a simple Rankine cycle. The rates of exergy destruction for the different components in the two cycles were also calculated and compared. The results suggest that the simple Rankine cycle exhibits better performance than the Kalina cycle when the heat input is only from the solar receiver. However, when using a two-tank molten-salt storage system as the primary source of heat input, the Kalina cycle showed an advantage over the simple Rankine cycle because of about 33 % reduction in the storage requirement. The solar receiver showed the highest rate of exergy destruction for both the cycles. The rates of exergy destruction in other components of the cycles were found to be highly dependent on the amount of recuperation, and the ammonia mass fraction and pressure at the turbine inlet. - Highlights: •Kalina cycle for a central receiver solar thermal power plant with direct steam generation. •Rankine cycle shows better plant exergy

  14. Design and modelling of an innovative three-stage thermal storage system for direct steam generation CSP plants

    Science.gov (United States)

    Garcia, Pierre; Vuillerme, Valéry; Olcese, Marco; El Mourchid, Nadim

    2016-05-01

    Thermal Energy Storage systems (TES) for a Direct Steam Generation (DSG) solar plant feature preferably three stages in series including a latent heat storage module so that steam can be recovered with a limited temperature loss. The storage system designed within the Alsolen Sup project is characterized by an innovative combination of sensible and latent modules. A dynamic model of this three-stage storage has been developed and applied to size the storage system of the Alsolen Sup® plant demonstrator at CEA Cadarache. Results of this simulation show that this promising concept is an efficient way to store heat in DSG solar plants.

  15. The Evaluation of Steam Generator Level Measurement Model for OPR1000 Using RETRAN-3D

    International Nuclear Information System (INIS)

    Doo Yong Lee; Soon Joon Hong; Byung Chul Lee; Heok Soon Lim

    2006-01-01

    Steam generator level measurement is important factor for plant transient analyses using best estimate thermal hydraulic computer codes since the value of steam generator level is used for steam generator level control system and plant protection system. Because steam generator is in the saturation condition which includes steam and liquid together and is the place that heat exchange occurs from primary side to secondary side, computer codes are hard to calculate steam generator level realistically without appropriate level measurement model. In this paper, we prepare the steam generator models using RETRAN-3D that include geometry models, full range feedwater control system and five types of steam generator level measurement model. Five types of steam generator level measurement model consist of level measurement model using elevation difference in downcomer, 1D level measurement model using fluid mass, 1D level measurement model using fluid volume, 2D level measurement model using power and fluid mass, and 2D level measurement model using power and fluid volume. And we perform the evaluation of the capability of each steam generator level measurement model by simulating the real plant transient condition, the title is 'Reactor Trip by The Failure of The Deaerator Level Control Card of Ulchin Unit 3'. The comparison results between real plant data and RETRAN-3D analyses for each steam generator level measurement model show that 2D level measurement model using power and fluid mass or fluid volume has more realistic prediction capability compared with other level measurement models. (authors)

  16. Research and engineering application of coordinated instrumentation control and protection technology between reactor and steam turbine generator on nuclear power plant

    International Nuclear Information System (INIS)

    Sun Xingdong

    2014-01-01

    The coordinated instrumentation control and protection technology between reactor and steam turbine generator (TG) usually is very significant and complicated for a new construction of nuclear power plant, because it carries the safety, economy and availability of nuclear power plant. Based on successful practice of a nuclear power plant, the experience on interface design and hardware architecture of coordinated instrumentation control and protection technology between reactor and steam turbine generator was abstracted and researched. In this paper, the key points and engineering experience were introduced to give the helpful instructions for the new project. (author)

  17. Leak suppression at steam generator man-, hand-, and eyeholes

    International Nuclear Information System (INIS)

    Sylvain, C.; Sutz, P.; Gemma, A.

    1988-01-01

    Plant unavailability associated with primary and secondary holes is approximately the same as that caused by steam generator tube defects, i.e., 0.5%. Problems encountered with steam generator man-, hand-, and eyeholes during plant operation have led Electricite de France (EdF) and Framatome to improve hole seal design and to develop robots for closing and cleaning them. The data base available in France in this field on some 150 steam generators in 900- and 1300-MW(electric) pressurized water reactors (the equivalent of 300 reactor-yr of operation) has been the base of the developments described in this paper. Incidents occurring in operation primarily concern had-and inspection holes located on the steam generator's secondary side. They include four kinds: (1) leakage detected in operation, requiring forced outages, (2) leakage detected during plant restart after a scheduled shutdown and resulting in a restart delay, (3) pitting of seal mating surfaces, not inducing any leakage but jeopardizing subsequent compliance and requiring difficult and costly repairs, and (4) seizing of screws or bolts. New primary and secondary hole stud tightening and maintenance machines help to improve the efficiency of the in-service closing operations. They provide savings of up to 80% on labor, duration of operations, and exposure

  18. Corrosion problems in PWR steam generators

    International Nuclear Information System (INIS)

    Weber, J.; Suery, P.

    1976-01-01

    Examinations on pulled steam generator tubes from the Swiss nuclear power plants Beznau I and II, together with some laboratory tests, may be summarized as follows: Corrosion problems in vertical U-tube steam generators with Alloy 600 as tube material are localized towards relatively narrow regions above the tube sheet where thermohydraulic conditions and, as a consequence thereof, chemical conditions are uncontrolled. Within these zones Alloy 600 is not sufficienthy resistent to caustic or phosphate attack (caustic stress corrosion cracking and general corrosion, resp.). The mechanisms of several corrosion phenomena are not fully understood. (orig.) [de

  19. Chemical cleaning as an essential part of steam generator asset management

    International Nuclear Information System (INIS)

    Stiepani, C.; Ammann, F.; Jones, D.; Evans, S.; Harper, K.

    2010-01-01

    Accumulation of deposits is intrinsic for the operation of Steam Generators in PWRs. Such depositions often lead to reduction of thermal performance, loss of component integrity and, in some cases to power restrictions. Accordingly removal of such deposits is an essential part of the asset management of the Steam Generators in a Nuclear Power Plant. Every plant has its individual condition, history and constraints which need to be considered when planning and performing a chemical cleaning. Typical points are: Sludge load amount and constitution of the deposits; Sludge distribution in the steam generator; Existing or expected corrosion problems; Amount and treatment possibilities for the waste generated. Depending on these points the strategy for chemical cleaning shall be evolved. The range of treatment starts with very soft cleanings with a removal of approx 100 kg per steam generator and goes to a full scale cleaning which can remove up to several thousand kilograms of deposits from a steam generator. Depending on the goal to be achieved and the steam generator present an adequate cleaning method shall be selected. Flexible and 'customizable' cleaning methods that can be adapted to the individual needs of a plant are therefore a must. Particular for the application of preventive cleanings where repeated or even regular application are intended, special focus has to be put on low corrosion and easy waste handling. Therefore AREVA has developed the 'C3' concept, Customized Chemical Cleaning concept. This concept covers the entire range of steam generator cleaning. Particular for the preventive maintenance cleanings processes with extreme low corrosion rates and easy waste handling are provided which make repeated applications safe and cost efficient. (author)

  20. Implementation status of performance demonstration program for steam generator tubing analysts in Korea

    International Nuclear Information System (INIS)

    Cho, Chan Hee; Lee, Hee Jong; Yoo, Hyun Ju; Nam, Min Woo; Hong, Sung Yull

    2013-01-01

    Some essential components in nuclear power plants are periodically inspected using non destructive examinations, for example ultrasonic, eddy current and radiographic examinations, in order to determine their integrity. These components include nuclear power plant items such as vessels, containments, piping systems, pumps, valves, tubes and core support structure. Steam generator tubes have an important safety role because they constitute one of the primary barriers between the radioactive and non radioactive sides of the nuclear power plant. There is potential that if a tube bursts while a plant is operating, radioactivity from the primary coolant system could escape directly to the atmosphere. Therefore, in service inspections are critical in maintaining steam generator tube integrity. In general, the eddy current testing is widely used for the inspection of steam generator tubes due tube integrity. In general, the eddy current testing is widely used for the inspection of steam generator tubes due to its high inspection speed and flaw detectability on non magnetic tubes. However, it is not easy to analyze correctly eddy current signals because they are influenced by many factors. Therefore, the performance of eddy current data analysts for steam generator tubing should be demonstrated comprehensively. In Korea, the performance of steam generator tubing analysts has been demonstrated using the Qualified Data Analyst program. This paper describes the performance demonstration program for steam generator tubing analysts and its implementation results in Korea. The pass rate of domestic analysts for this program was 71.4%

  1. Implementation status of performance demonstration program for steam generator tubing analysts in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Chan Hee; Lee, Hee Jong; Yoo, Hyun Ju; Nam, Min Woo [KHNP Central Research Institute, Daejeon (Korea, Republic of); Hong, Sung Yull [Yeungnam Univ., Gyeongsan (Korea, Republic of)

    2013-02-15

    Some essential components in nuclear power plants are periodically inspected using non destructive examinations, for example ultrasonic, eddy current and radiographic examinations, in order to determine their integrity. These components include nuclear power plant items such as vessels, containments, piping systems, pumps, valves, tubes and core support structure. Steam generator tubes have an important safety role because they constitute one of the primary barriers between the radioactive and non radioactive sides of the nuclear power plant. There is potential that if a tube bursts while a plant is operating, radioactivity from the primary coolant system could escape directly to the atmosphere. Therefore, in service inspections are critical in maintaining steam generator tube integrity. In general, the eddy current testing is widely used for the inspection of steam generator tubes due tube integrity. In general, the eddy current testing is widely used for the inspection of steam generator tubes due to its high inspection speed and flaw detectability on non magnetic tubes. However, it is not easy to analyze correctly eddy current signals because they are influenced by many factors. Therefore, the performance of eddy current data analysts for steam generator tubing should be demonstrated comprehensively. In Korea, the performance of steam generator tubing analysts has been demonstrated using the Qualified Data Analyst program. This paper describes the performance demonstration program for steam generator tubing analysts and its implementation results in Korea. The pass rate of domestic analysts for this program was 71.4%.

  2. Physical and statistical models for steam generator clogging diagnosis

    CERN Document Server

    Girard, Sylvain

    2014-01-01

    Clogging of steam generators in nuclear power plants is a highly sensitive issue in terms of performance and safety and this book proposes a completely novel methodology for diagnosing this phenomenon. It demonstrates real-life industrial applications of this approach to French steam generators and applies the approach to operational data gathered from French nuclear power plants. The book presents a detailed review of in situ diagnosis techniques and assesses existing methodologies for clogging diagnosis, whilst examining their limitations. It also addresses numerical modelling of the dynamic

  3. Fault tolerant control for steam generators in nuclear power plant

    International Nuclear Information System (INIS)

    Deng Zhihong; Shi Xiaocheng; Xia Guoqing; Fu Mingyu

    2010-01-01

    Based on the nonlinear system with stochastic noise, a bank of extended Kalman filters is used to estimate the state of sensors. It can real-time detect and isolate the single sensor fault, and reconstruct the sensor output to keep steam generator water level stable. The simulation results show that the methodology of employing a bank of extended Kalman filters for steam generator fault tolerant control design is feasible. (authors)

  4. Nuclear steam power plant cycle performance calculations supported by power plant monitoring and results computer

    International Nuclear Information System (INIS)

    Bettes, R.S.

    1984-01-01

    The paper discusses the real time performance calculations for the turbine cycle and reactor and steam generators of a nuclear power plant. Program accepts plant measurements and calculates performance and efficiency of each part of the cycle: reactor and steam generators, turbines, feedwater heaters, condenser, circulating water system, feed pump turbines, cooling towers. Presently, the calculations involve: 500 inputs, 2400 separate calculations, 500 steam properties subroutine calls, 200 support function accesses, 1500 output valves. The program operates in a real time system at regular intervals

  5. Computer code to simulate transients in a steam generator of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Silva, J.M. da.

    1979-01-01

    A digital computer code KIBE was developed to simulate the transient behavior of a Steam Generator used in Pressurized Water Reactor Power PLants. The equations of Conservation of mass, energy and momentum were numerically integrated by an implicit method progressively in the several axial sections into which the Steam Generator was divided. Forced convection heat transfer was assumed on the primary side, while on the secondary side all the different modes of heat transfer were permitted and deternined from the various correlations. The stability of the stationary state was verified by its reproducibility during the integration of the conservation equation without any pertubation. Transient behavior resulting from pertubations in the flow and the internal energy (temperature) at the inlet of the primary side were simulated. The results obtained exhibited satisfactory behaviour. (author) [pt

  6. WWER-1000 steam generator integrity. A publication of the extrabudgetary programme on the safety of WWER and RBMK nuclear power plants

    International Nuclear Information System (INIS)

    1997-07-01

    Programme was initiated by IAEA in 1990 with the aim to assist the countries of Central and Eastern Europe and former Soviet Union in evaluating the safety of their first generation WWER-440/230 nuclear power plants. The main objectives were: to identify major design and operational safety issues; to establish international consensus on priorities for safety improvements; and to provide assistance in the review of the competence and and adequacy of safety improvement programs. The scope was extended in 1992 ro include RBMK, WWER-440/312 and WWER-1000 plants in operation and under construction. Based on the operational experience of more than 90 reactor years of WWER-1000 NPPs having 80 steam generators in operation or under construction the steam generator integrity was recognized as an important issue of high safety concern. The purpose of this report is to integrate available information on the issue of WWER-1000 steam generator integrity with the focus on the steam generator cold collector damage in particular. This information covers the status of stem generators at operating plants, cause analysis of collector cracking, the damage mechanisms involved, operational aspects and corrective measures developed and implemented. Consideration is given to material, design and fabrication related aspects, operational conditions, system solutions, and in-service inspection. Detailed conclusions and recommendations are provided for each of these aspects

  7. Fourth international seminar on horizontal steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Tuomisto, H. [ed.] [IVO Group, Vantaa (Finland); Purhonen, H. [ed.] [VTT, Espoo (Finland); Kouhia, V. [ed.] [Lappeenranta Univ. of Technology (Finland)

    1997-12-31

    The general objective of the International Seminars of Horizontal Steam Generator Modelling has been the improvement in understanding of realistic thermal hydraulic behaviour of the generators when performing safety analyses for VVER reactors. The main topics presented in the fourth seminar were: thermal hydraulic experiments and analyses, primary collector integrity, feedwater distributor replacement, management of primary-to-secondary leakage accidents and new developments in the VVER safety technology. The number of participants, representing designers and manufacturers of the horizontal steam generators, plant operators, engineering companies, research organizations, universities and regulatory authorities, was 70 from 10 countries.

  8. Fourth international seminar on horizontal steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Tuomisto, H [ed.; IVO Group, Vantaa (Finland); Purhonen, H [ed.; VTT, Espoo (Finland); Kouhia, V [ed.; Lappeenranta Univ. of Technology (Finland)

    1998-12-31

    The general objective of the International Seminars of Horizontal Steam Generator Modelling has been the improvement in understanding of realistic thermal hydraulic behaviour of the generators when performing safety analyses for VVER reactors. The main topics presented in the fourth seminar were: thermal hydraulic experiments and analyses, primary collector integrity, feedwater distributor replacement, management of primary-to-secondary leakage accidents and new developments in the VVER safety technology. The number of participants, representing designers and manufacturers of the horizontal steam generators, plant operators, engineering companies, research organizations, universities and regulatory authorities, was 70 from 10 countries.

  9. Fourth international seminar on horizontal steam generators

    International Nuclear Information System (INIS)

    Tuomisto, H.; Purhonen, H.; Kouhia, V.

    1997-01-01

    The general objective of the International Seminars of Horizontal Steam Generator Modelling has been the improvement in understanding of realistic thermal hydraulic behaviour of the generators when performing safety analyses for VVER reactors. The main topics presented in the fourth seminar were: thermal hydraulic experiments and analyses, primary collector integrity, feedwater distributor replacement, management of primary-to-secondary leakage accidents and new developments in the VVER safety technology. The number of participants, representing designers and manufacturers of the horizontal steam generators, plant operators, engineering companies, research organizations, universities and regulatory authorities, was 70 from 10 countries

  10. In-service diagnostic systems of steam generators, pressurizers and other components of WWER type nuclear power plants

    International Nuclear Information System (INIS)

    Matal, O.

    1988-01-01

    A detailed description is presented of the systems of vibration inspections and systems of determining residual service life, implemented as in-service diagnostic systems for steam generators and pressurizers at the Dukovany nuclear power plant. Low temperature accelerometers of the KD or KS type and high temperature accelerometers CA 91 are used as vibration sensors. In the system of vibration inspection a total of 64 vibration measuring chains of Czechoslovak make and design are installed in the power plant. Systems are being built for determining residual service life which consist of 75 special chains for heat monitoring with thermocouples installed on selected assemblies of the steam generators and the pressurizers serving to monitor and evaluate heat stress. Also included in the system for determining residual service life are 16 routes for water withdrawal from steam generators. Their purpose is to make in-service determinations of places of biggest concentrations of impurities in secondary water, to determine the biggest local chemical exposure of primary collector and heat exchange tube materials and to optimize the size and place of leachate withdrawal. (Z.M.). 2 figs., 2 tabs., 15 refs

  11. Results of the secondary side chemical cleaning of the steam generators

    International Nuclear Information System (INIS)

    Doma, A.; Patek, G.

    2001-01-01

    A significant amount of deposit has developed on the secondary side of the heat transfer tubes of the steam generators (SG) of the Paks Nuclear Power Plant units in course of the years. More than 99.5% of the deposit is made up of magnetite (Fe 3 O 4 ) generated in the secondary circuit of the power plant. Those deposits lead to the decrease of the heat transfer. Even more important is its role from the point of view of operational reliability of the steam generators, leak tightness between the primary and secondary sides. The first series of cleaning took place following 8-9 years of operation of the units. Following the first cleaning cycle the transport of the corrosion products into the steam generators did not change, and thus obviously new cleaning was required. Periodical cleaning of the steam generators shall be assured. (R.P.)

  12. Optimisation of a Kalina cycle for a central receiver solar thermal power plant with direct steam generation

    DEFF Research Database (Denmark)

    Modi, Anish; Haglind, Fredrik

    2014-01-01

    Central receiver solar thermal power plants are regarded as one of the promising ways to generate electricity in near future. They offer the possibility of using high temperatures and pressures to achieve high efficiencies with standard power cycles. A direct steam generation approach can be used...

  13. Themoeconomic optimization of triple pressure heat recovery steam generator operating parameters for combined cycle plants

    Directory of Open Access Journals (Sweden)

    Mohammd Mohammed S.

    2015-01-01

    Full Text Available The aim of this work is to develop a method for optimization of operating parameters of a triple pressure heat recovery steam generator. Two types of optimization: (a thermodynamic and (b thermoeconomic were preformed. The purpose of the thermodynamic optimization is to maximize the efficiency of the plant. The selected objective for this purpose is minimization of the exergy destruction in the heat recovery steam generator (HRSG. The purpose of the thermoeconomic optimization is to decrease the production cost of electricity. Here, the total annual cost of HRSG, defined as a sum of annual values of the capital costs and the cost of the exergy destruction, is selected as the objective function. The optimal values of the most influencing variables are obtained by minimizing the objective function while satisfying a group of constraints. The optimization algorithm is developed and tested on a case of CCGT plant with complex configuration. Six operating parameters were subject of optimization: pressures and pinch point temperatures of every three (high, intermediate and low pressure steam stream in the HRSG. The influence of these variables on the objective function and production cost are investigated in detail. The differences between results of thermodynamic and the thermoeconomic optimization are discussed.

  14. Fifth CNS international steam generator conference

    International Nuclear Information System (INIS)

    2006-01-01

    The Fifth CNS International Steam Generator Conference was held on November 26-29, 2006 in Toronto, Ontario, Canada. In contrast with other conferences which focus on specific aspects, this conference provided a wide ranging forum on nuclear steam generator technology from life-cycle management to inspection and maintenance, functional and structural performance characteristics to design architecture. The 5th conference has adopted the theme: 'Management of Real-Life Equipment Conditions and Solutions for the Future'. This theme is appropriate at a time of transition in the industry when plants are looking to optimize the performance of existing assets, prevent costly degradation and unavailability, while looking ahead for new steam generator investments in life-extension, replacements and new-build. More than 50 technical papers were presented in sessions that gave an insight to the scope: life management strategies; fouling, cleaning and chemistry; replacement strategies and new build design; materials degradation; condition assessment/fitness for service; inspection advancements and experience; and thermal hydraulic performance

  15. Steam turbine chemistry in light water reactor plants

    International Nuclear Information System (INIS)

    Svoboda, Robert; Haertel, Klaus

    2008-01-01

    Steam turbines in boiling water reactor (BWR) and pressurized water reactor (PWR) power plants of various manufacturers have been affected by corrosion fatigue and stress corrosion cracking. Steam chemistry has not been a prime focus for related research because the water in nuclear steam generating systems is considered to be of high purity. Steam turbine chemistry however addresses more the problems encountered in fossil fired power plants on all volatile treatment, where corrosive environments can be formed in zones where wet steam is re-evaporated and dries out, or in the phase transition zone, where superheated steam starts to condense in the low-pressure (LP) turbine. In BWR plants the situation is aggravated by the fact that no alkalizing agents are used in the cycle, thus making any anionic impurity immediately acidic. This is illustrated by case studies of pitting corrosion of a 12 % Cr steel gland seal and of flow-oriented corrosion attack on LP turbine blades in the phase transition zone. In PWR plants, volatile alkalizing agents are used that provide some buffering of acidic impurities, but they also produce anionic decomposition products. (orig.)

  16. Steam generator waterlancing at DNGS

    International Nuclear Information System (INIS)

    Seppala, D.; Malaugh, J.

    1995-01-01

    Darlington Nuclear Generating Station (DNGS) is a four 900 MW Unit nuclear station forming part of the Ontario Hydro East System. There are four identical steam generators(SGs) per reactor unit. The Darlington SGs are vertical heat exchangers with an inverted U-tube bundle in a cylindrical shell. The DNGS Nuclear Plant Life Assurance Group , a department of DNGS Engineering Services have taken a Proactive Approach to ensure long term SG integrity. Instead of waiting until the tubesheets are covered by a substantial and established hard deposit; DNGS plan to clean each steam generator's tubesheet, first half lattice tube support assembly and bottom of the thermal plate every four years. The ten year business plan provides for cleaning and inspection to be conducted on all four SGs in each unit during maintenance outages (currently scheduled for every four years)

  17. Fretting wear damage of steam generator tubes and its prediction modeling

    International Nuclear Information System (INIS)

    Che Honglong; Lei Mingkai

    2013-01-01

    The steam generator is the key equipment used for the energy transition in nuclear power plant. Since the high-temperature and high-pressure fluid flows with high speed, the steam generator tubes will be excited and vibrate, leading to the tremendous fretting wear problem on the tubes, sometimes even leading to tube cracking. This paper introduces typical fretting wear cases, the result of corresponding simulation wear experiment and damage mechanism which combining mechanical wear and erosion-corrosion. Work rate model could give a reasonable life prediction about the steam generator tube, and this predictive model has been used in nuclear power plant safety assessment. (authors)

  18. Development of steam generators for combustion of biofuels up to 10 t/h

    Energy Technology Data Exchange (ETDEWEB)

    Bentzin, H

    1985-01-01

    Combustion parameters are compared for raw brown coal, rice hulls and coconut shells as fuel in small steam generators. Combustion of native biofuel is seen as a power generation alternative in developing countries. Experiments were conducted on a 6.5 t/h moving grate steam generator with a firing grate surface of 7.2 m/sup 2/. Combustion results are shown in a table. Technological modifications carried out in adapting brown coal-fired steam generators to biofuels are also listed. A series of small steam generators for combustion of brown coal, biofuels including wood chips, as well as heating oil as back-up has been developed by the Karl-Marx-Stadt Dampfkesselbau Plant, GDR, with steam capacities ranging from 3.2 to 10 t/h. Technical specifications and diagrams of this series design (DGK-3, DGK-45, DWK 2S) are given. A larger steam generator with 20 t/h steam capacity for combustion of raw brown coal, bagasse, wood chips with heating oil and for rice hulls as support fuels is being developed by the Berlin Dampferzeugerbau Plant, GDR. 5 references.

  19. Steam Generator Group Project. Annual report, 1982

    International Nuclear Information System (INIS)

    Clark, R.A.; Lewis, M.

    1984-02-01

    The Steam Generator Group Project (SGGP) is an NRC program joined by additional sponsors. The SGGP utilizes a steam generator removed from service at a nuclear plant (Surry 2) as a vehicle for research on a variety of safety and reliability issues. This report is an annual summary of progress of the program for 1982. Information is presented on the Steam Generator Examination Facility (SGEF), especially designed and constructed for this research. Loading of the generator into the SGEF is then discussed. The report then presents radiological field mapping results and personnel exposure monitoring. This is followed by information on field reduction achieved by channel head decontaminations. The report then presents results of a secondary side examination through shell penetrations placed prior to transport, confirming no change in generator condition due to transport. Decontamination of the channel head is discussed followed by plans for eddy current testing and removal of the plugs placed during service. Results of a preliminary profilometry examination are then provided

  20. Steam Generator Lancing and FOSAR for HANUL Nuclear Power Plant Unit 2

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo-Tae [Korea Hydro and Nuclear Power Co. Ltd. Central Research Institute, Daejeon (Korea, Republic of); Kim, Sang-Tae; Yoon, Sang-Jung; Seo, Hong-Chang [Sae-An Engineering Corporation, Seoul (Korea, Republic of)

    2015-05-15

    Sludge weight removed during the deposit removal operation was 10.68 kg. Annulus, tubelane, and in-bundle area of the steam generators were searched for possible foreign objects. Three foreign objects were found and removed. Mock-up training before the operation was helpful to finish the service as scheduled. Sludge lancing and FOSAR were Sludge lancing and FOSAR were successfully completed for Hanul nuclear power plant unit 2 during the 19''t''h outage. Mock-up training before the service was helpful for the operators to finish the job on time. Inspection, barrel spray, final barrel/flushing, and sludge collector cleaning was completed for the three steam generators 'A', 'B', and 'C.' Six bag filters and 42 cartridge filters were consumed to remove 10.68 kg of sludge. Three foreign objects were found and removed. One foreign object (HU2R19SGB01) was found in SG 'B', and two objects (HU2R19SGC01, HU2R19SGC02) were found in SG 'C.'.

  1. Monitoring method for steam generator operation

    International Nuclear Information System (INIS)

    Tamaoki, Tetsuo

    1991-01-01

    In an LMFBR plant having an once-through steam generator, reduction of life of a heat transfer pipe caused by heat cycle fatigue is monitored by early finding for the occurrence of abnormality in the inside of the steam generator and by continuous monitoring for the position of departure from nucleate boiling (DNB), which are difficult with existent static characteristic analysis codes. That is, RMS values of fluctuations in temperature signals sent from thermocouples for measuring the fluid temperature in the vicinity of heat transfer pipe disposed along a primary channel of the once-through type steam generator. The abnormality in heat transfer performance is monitored by the distribution change of the RMS values. Subsequently, DNB point on the side of water and steam is determined by the distribution of the RMS value. Then, accumulated values of the product between the time in which the starting point stays in the DNB region and a life consumption amount per unit time given in accordance with the operation condition are monitored. Accordingly, thermal fatigue failure of the heat transfer pipe due to temperature fluctuation in the DNB region is monitored. (I.S.)

  2. Status of the CRBRP steam-generator design

    International Nuclear Information System (INIS)

    Schmidt, J.E.; Martinez, R.S.; Murdock, J.F.

    1981-06-01

    Fabrication of the Prototype Unit is near completion and will be delivered to the test site in August, 1981. The Plant Unit design is presently at an advanced stage and will result in steam generator units fully capable of meeting all the requiments of the CRBRP Power Plant

  3. Multi-region fuzzy logic controller with local PID controllers for U-tube steam generator in nuclear power plant

    Directory of Open Access Journals (Sweden)

    Puchalski Bartosz

    2015-12-01

    Full Text Available In the paper, analysis of multi-region fuzzy logic controller with local PID controllers for steam generator of pressurized water reactor (PWR working in wide range of thermal power changes is presented. The U-tube steam generator has a nonlinear dynamics depending on thermal power transferred from coolant of the primary loop of the PWR plant. Control of water level in the steam generator conducted by a traditional PID controller which is designed for nominal power level of the nuclear reactor operates insufficiently well in wide range of operational conditions, especially at the low thermal power level. Thus the steam generator is often controlled manually by operators. Incorrect water level in the steam generator may lead to accidental shutdown of the nuclear reactor and consequently financial losses. In the paper a comparison of proposed multi region fuzzy logic controller and traditional PID controllers designed only for nominal condition is presented. The gains of the local PID controllers have been derived by solving appropriate optimization tasks with the cost function in a form of integrated squared error (ISE criterion. In both cases, a model of steam generator which is readily available in literature was used for control algorithms synthesis purposes. The proposed multi-region fuzzy logic controller and traditional PID controller were subjected to broad-based simulation tests in rapid prototyping software - Matlab/Simulink. These tests proved the advantage of multi-region fuzzy logic controller with local PID controllers over its traditional counterpart.

  4. Steam generator secondary pH during a steam generator tube rupture

    International Nuclear Information System (INIS)

    Adams, J.P.; Peterson, E.S.

    1991-12-01

    The Nuclear Regulatory Commission requires utilizes to determine the response of a pressurized water reactor to a steam generator tube rupture (SGTR) as part of the safety analysis for the plant. The SGTR analysis includes assumptions regarding the partitioning of iodine between liquid and vapor in steam generator secondary. Experimental studies have determined that the partitioning of iodine in water is very sensitive to the pH. Based on this experimental evidence, the NRC requested the INEL to perform an analytical assessment of secondary coolant system (SCS) pH during an SGTR. Design basis thermal and hydraulic calculations were used together with industry standard chemistry guidelines to determine the SCS chemical concentrations during an SGTR. These were used as input to the Facility for Analysis of Chemical Thermodynamics computer system to calculate the equilibrium pH in the SCS at various discrete time during an SGTR. The results of this analysis indicate that the SCS pH decreases from the initial value of 8.8 to approximately 6.5 by the end of the transient, independent of PWR design

  5. Application of perturbation methods for sensitivity analysis for nuclear power plant steam generators

    International Nuclear Information System (INIS)

    Gurjao, Emir Candeia

    1996-02-01

    The differential and GPT (Generalized Perturbation Theory) formalisms of the Perturbation Theory were applied in this work to a simplified U-tubes steam generator model to perform sensitivity analysis. The adjoint and importance equations, with the corresponding expressions for the sensitivity coefficients, were derived for this steam generator model. The system was numerically was numerically solved in a Fortran program, called GEVADJ, in order to calculate the sensitivity coefficients. A transient loss of forced primary coolant in the nuclear power plant Angra-1 was used as example case. The average and final values of functionals: secondary pressure and enthalpy were studied in relation to changes in the secondary feedwater flow, enthalpy and total volume in secondary circuit. Absolute variations in the above functionals were calculated using the perturbative methods, considering the variations in the feedwater flow and total secondary volume. Comparison with the same variations obtained via direct model showed in general good agreement, demonstrating the potentiality of perturbative methods for sensitivity analysis of nuclear systems. (author)

  6. Steam generator life management

    International Nuclear Information System (INIS)

    Tapping, R.L.; Nickerson, J.; Spekkens, P.; Maruska, C.

    1998-01-01

    Steam generators are a critical component of a nuclear power reactor, and can contribute significantly to station unavailability, as has been amply demonstrated in Pressurized Water Reactors (PWRs). CANDU steam generators are not immune to steam generator degradation, and the variety of CANDU steam generator designs and tube materials has led to some unexpected challenges. However, aggressive remedial actions, and careful proactive maintenance activities, have led to a decrease in steam generator-related station unavailability of Canadian CANDUs. AECL and the CANDU utilities have defined programs that will enable existing or new steam generators to operate effectively for 40 years. Research and development work covers corrosion and mechanical degradation of tube bundles and internals, chemistry, thermal hydraulics, fouling, inspection and cleaning, as well as provision for specially tool development for specific problem solving. A major driving force is development of CANDU-specific fitness-for-service guidelines, including appropriate inspection and monitoring technology to measure steam generator condition. Longer-range work focuses on development of intelligent on-line monitoring for the feedwater system and steam generator. New designs have reduced risk of corrosion and fouling, are more easily inspected and cleaned, and are less susceptible to mechanical damage. The Canadian CANDU utilities have developed programs for remedial actions to combat degradation of performance (Gentilly-2, Point Lepreau, Bruce A/B, Pickering A/B), and have developed strategic plans to ensure that good future operation is ensured. This report shows how recent advances in cleaning technology are integrated into a life management strategy, discusses downcomer flow measurement as a means of monitoring steam generator condition, and describes recent advances in hideout return as a life management tool. The research and development program, as well as operating experience, has identified

  7. Development of data management system for steam generator inspection

    International Nuclear Information System (INIS)

    Jung, Yong Moo; Im, Chang Jae; Lee, Yoon Sang; Kang, Soon Joo; An, Jong Kwan

    1994-06-01

    The data communications environment for transferring Nuclear Power Plant Steam Generator Eddy Current testing data was investigated and after connecting LAN to Hinet-F network, the remote data transfer with the speed of 56 kbps was tested successfully. Data management system for Steam Generator Eddy current testing was also developed by using HP-UX, RMB (Rock Mountain Basic) 21 figs, 13 tabs, 5 refs. (Author)

  8. Development of data management system for steam generator inspection

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Yong Moo; Im, Chang Jae; Lee, Yoon Sang; Kang, Soon Joo; An, Jong Kwan [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-06-01

    The data communications environment for transferring Nuclear Power Plant Steam Generator Eddy Current testing data was investigated and after connecting LAN to Hinet-F network, the remote data transfer with the speed of 56 kbps was tested successfully. Data management system for Steam Generator Eddy current testing was also developed by using HP-UX, RMB (Rock Mountain Basic) 21 figs, 13 tabs, 5 refs. (Author).

  9. Intermediate heat exchanger and steam generator designs for the HYLIFE-II fusion power plant using molten salts

    International Nuclear Information System (INIS)

    Lee, Y.T.; Hoffman, M.A.

    1992-01-01

    The HYLIFE-II fusion power plant employs the molten salt, Flibe, for the liquid jets which form the self-healing 'first wall' of the reactor. The molten salt, sodium fluoroborate then transports the heat from the IHX's to the steam generators. The design and optimization of the IHX's and the steam generators for use with molten salts has been done as part of the HYLIFE-II conceptual design study. The results of this study are described, and reference designs of these large heat exchangers are selected to minimize the cost of electricity while satisfying other important constraints

  10. Dynamic and control of a once through steam generator

    International Nuclear Information System (INIS)

    Gomes, Arivaldo Vicente

    1979-01-01

    This paper presents a non linear distributed parameter model for the dynamics and feedback control of a large countercurrent heat exchanger used as a once through steam generator for a breeder reactor power plant. A convergent, implicit method has been developed to solve simultaneously the equations of conservation of mass, momentum and energy. The model, applicable to heat exchanger systems in general, has been used specifically to study the performance of a once-through steam generator with respect to its load following ability and stability of throttle steam temperature and pressure. (author)

  11. Cleaning device for steam units in a nuclear power plant

    International Nuclear Information System (INIS)

    Sasamuro, Takemi.

    1978-01-01

    Purpose: To prevent radioactive contamination upon dismantling and inspection of steam units such as a turbine to a building containing such units and the peripheral area. Constitution: A steam generator indirectly heated by steam supplied from steam generating source in a separate system containing no radioactivity is provided to produce cleaning steam. A cleaning steam pipe is connected by way of a stop valve between separation valve of a nuclear power plant steam pipe and a high pressure turbine. Upon cleaning, the separation valve is closed, and steam supplied from the cleaning steam pipe is flown into a condenser. The water thus condensated is returned by way of a feed water heater and a condenser to a water storage tank. (Nakamura, S.)

  12. Optimization for set-points and robust model predictive control for steam generator in nuclear power plants

    International Nuclear Information System (INIS)

    Osgouee, Ahmad

    2010-01-01

    Full Text: Nuclear power plants will be needed for future energy demands, which are expected to grow at different rates around the world. Lower operating cost is one of the major benefits of nuclear power plants over fossil power plants. Also, the plant availability is a key factor to economic index of a nuclear power plant. The opportunities for building new nuclear power plants around the world will depend on the need for clean energy with zero, or minimal emissions to support healthy communities, supply reliable energy with stable prices, and issues related to global warming and climate change. Compared to other types of power plants, nuclear power plants are preferred for their numerous advantages, including low operating costs, emission free operation with no smog, no acid rain, and no effect on global warming. Economic feasibility of a nuclear power plant requires for smooth and uninterrupted plant operation during electrical power demand variations. The steam generator (SG) in a nuclear power plant plays an important role in cooling of the reactor, balancing energy between reactor and turbine and producing steam for the turbine-generators. SG acts as an additional safety barrier between the nuclear reactor and the outside world also. As a result, control of the water inventory in the SG is very important to ensure continuous cooling of the nuclear reactor core, plant protection and at the same time, to prevent the SG tubes and turbine blades failure. A review of past nuclear power plant operation experiences indicates that unplanned reactor trips due to steam generator level (SGL) control have been significant contributors to plant unavailability. During low power operation, the level control is complicated by the thermal reverse effects known as 'shrink and swell'. Manual operator intervention to the SGL control system at low reactor power and to the unit upset conditions has been identified as an operator response in most nuclear power plants. In spite of

  13. To the choice of the regeneration system of the K-1000-68/1500 turbine plant for the NPP with a vertical-type steam generator

    International Nuclear Information System (INIS)

    Kuznetsov, N.M.; Piskarev, A.A.; Grinman, M.I.; Kruglikov, P.A.

    1985-01-01

    Several variants of the heat regeneration system for the NPP with WWER-1000 type reactors using vertical steam generator (SG) generating saturated steam at 7.2 MPa pressure and 200 deg C feed water temperature at the SG inlet are considered. The results of comparison of variants in water and steam circuits of turbine plants are greatly influenced by integral economy account, i.e. efficiency indexes account under variable conditions of power unit operation. From variants of water and steam circuits of the K-1000-68/1500 turbine plant considered preference is given to the variant with four low pressure heaters with increased up to 1.25 MPa pressure in a deacrator without high pressure heater with pumping intermediate steam superheater condensate into feedwater circuit

  14. Simulating the steam generator and the pressurizer of a PWR nuclear power plant

    International Nuclear Information System (INIS)

    De Greef, J.F.

    1985-01-01

    In a PWR nuclear power plant, considered as a power generating device, the steam generator as a subset plays an important role in the generation process, whereas the pressurizer rather acts as a control device for security purposes. Nevertheless, from a thermodynamical point of view, the two subsets behave basically in the same way, so that a common set of basic equations may be suggested to develop for each the proper mathematical simulation model. In this paper the generation of this common set of basic equations is described, from which a specific model for each device is derived. A numerical illustration of the behaviour of the two devices for typical inputs to the derived simulation model is pictured. (author)

  15. Hydrogen-based power generation from bioethanol steam reforming

    Energy Technology Data Exchange (ETDEWEB)

    Tasnadi-Asztalos, Zs., E-mail: tazsolt@chem.ubbcluj.ro; Cormos, C. C., E-mail: cormos@chem.ubbcluj.ro; Agachi, P. S. [Babes-Bolyai University, Faculty of Chemistry and Chemical Engineering, 11 Arany Janos, Postal code: 400028, Cluj-Napoca (Romania)

    2015-12-23

    This paper is evaluating two power generation concepts based on hydrogen produced from bioethanol steam reforming at industrial scale without and with carbon capture. The power generation from bioethanol conversion is based on two important steps: hydrogen production from bioethanol catalytic steam reforming and electricity generation using a hydrogen-fuelled gas turbine. As carbon capture method to be assessed in hydrogen-based power generation from bioethanol steam reforming, the gas-liquid absorption using methyl-di-ethanol-amine (MDEA) was used. Bioethanol is a renewable energy carrier mainly produced from biomass fermentation. Steam reforming of bioethanol (SRE) provides a promising method for hydrogen and power production from renewable resources. SRE is performed at high temperatures (e.g. 800-900°C) to reduce the reforming by-products (e.g. ethane, ethene). The power generation from hydrogen was done with M701G2 gas turbine (334 MW net power output). Hydrogen was obtained through catalytic steam reforming of bioethanol without and with carbon capture. For the evaluated plant concepts the following key performance indicators were assessed: fuel consumption, gross and net power outputs, net electrical efficiency, ancillary consumptions, carbon capture rate, specific CO{sub 2} emission etc. As the results show, the power generation based on bioethanol conversion has high energy efficiency and low carbon footprint.

  16. Hydrogen-based power generation from bioethanol steam reforming

    International Nuclear Information System (INIS)

    Tasnadi-Asztalos, Zs.; Cormos, C. C.; Agachi, P. S.

    2015-01-01

    This paper is evaluating two power generation concepts based on hydrogen produced from bioethanol steam reforming at industrial scale without and with carbon capture. The power generation from bioethanol conversion is based on two important steps: hydrogen production from bioethanol catalytic steam reforming and electricity generation using a hydrogen-fuelled gas turbine. As carbon capture method to be assessed in hydrogen-based power generation from bioethanol steam reforming, the gas-liquid absorption using methyl-di-ethanol-amine (MDEA) was used. Bioethanol is a renewable energy carrier mainly produced from biomass fermentation. Steam reforming of bioethanol (SRE) provides a promising method for hydrogen and power production from renewable resources. SRE is performed at high temperatures (e.g. 800-900°C) to reduce the reforming by-products (e.g. ethane, ethene). The power generation from hydrogen was done with M701G2 gas turbine (334 MW net power output). Hydrogen was obtained through catalytic steam reforming of bioethanol without and with carbon capture. For the evaluated plant concepts the following key performance indicators were assessed: fuel consumption, gross and net power outputs, net electrical efficiency, ancillary consumptions, carbon capture rate, specific CO 2 emission etc. As the results show, the power generation based on bioethanol conversion has high energy efficiency and low carbon footprint

  17. Hydrogen-based power generation from bioethanol steam reforming

    Science.gov (United States)

    Tasnadi-Asztalos, Zs.; Cormos, C. C.; Agachi, P. S.

    2015-12-01

    This paper is evaluating two power generation concepts based on hydrogen produced from bioethanol steam reforming at industrial scale without and with carbon capture. The power generation from bioethanol conversion is based on two important steps: hydrogen production from bioethanol catalytic steam reforming and electricity generation using a hydrogen-fuelled gas turbine. As carbon capture method to be assessed in hydrogen-based power generation from bioethanol steam reforming, the gas-liquid absorption using methyl-di-ethanol-amine (MDEA) was used. Bioethanol is a renewable energy carrier mainly produced from biomass fermentation. Steam reforming of bioethanol (SRE) provides a promising method for hydrogen and power production from renewable resources. SRE is performed at high temperatures (e.g. 800-900°C) to reduce the reforming by-products (e.g. ethane, ethene). The power generation from hydrogen was done with M701G2 gas turbine (334 MW net power output). Hydrogen was obtained through catalytic steam reforming of bioethanol without and with carbon capture. For the evaluated plant concepts the following key performance indicators were assessed: fuel consumption, gross and net power outputs, net electrical efficiency, ancillary consumptions, carbon capture rate, specific CO2 emission etc. As the results show, the power generation based on bioethanol conversion has high energy efficiency and low carbon footprint.

  18. Proceedings of steam generator sludge deposition in recirculating and once through steam generator upper tube bundle and support plates

    International Nuclear Information System (INIS)

    Baker, R.L.; Harvego, E.A.

    1992-01-01

    The development of remedial measures of shot peening have given nuclear utilities viable measures to address primary water stress corrosion cracking to extend steam generator life. The nuclear utility industry is now faced with potential replacement of steam generators in nuclear power plants due to stress corrosion cracking and intergranular attach in crevice locations on the secondary side of steam generators at tube support plates and at the crevice at the top of the tube sheet. Significant work has been done on developing and understanding of the effects of sludge buildup on the corrosion process at these locations. This session was envisioned to provide a forum for the development of an understanding of the mechanisms which control the transport and deposition of sludge on the secondary side of steam generators. It is hoped that this information will aid utilities in monitoring the progression of fouling of these crevices by further knowledge in where to look for the onset of support plate crevice fouling. An understanding of the progression of fouling from upper tube support plates to those lower in the steam generator where higher temperatures cause the corrosion process to initiate first can aid the nuclear utility industry in developing remedial measures for this condition and in providing a forewarning of when to apply such remedial measures

  19. Dismantling of the 50 MW steam generator test facility

    International Nuclear Information System (INIS)

    Nakai, S.; Onojima, T.; Yamamoto, S.; Akai, M.; Isozaki, T.; Gunji, M.; Yatabe, T.

    1997-01-01

    We have been dismantling the 50MW Steam Generator Test Facility (50MWSGTF). The objectives of the dismantling are reuse of sodium components to a planned large scale thermal hydraulics sodium test facility and the material examination of component that have been operated for long time in sodium. The facility consisted of primary sodium loop with sodium heater by gas burner as heat source instead of reactor, secondary sodium loop with auxiliary cooling system (ACS) and water/steam system with steam temperature and pressure reducer instead of turbine. It simulated the 1 loop of the Monju cooling system. The rated power of the facility was 50MWt and it was about 1/5 of the Monju power plant. Several sodium removal methods are applied. As for the components to be dismantled such as piping, intermediate heat exchanger (IHX), air cooled heat exchangers (AC), sodium is removed by steam with nitrogen gas in the air or sodium is burned in the air. As for steam generators which material tests are planned, sodium is removed by steam injection with nitrogen gas to the steam generator. The steam generator vessel is filled with nitrogen and no air in the steam generator during sodium removal. As for sodium pumps, pump internal structure is pulled out from the casing and installed into the tank. After the installation, sodium is removed by the same method of steam generator. As for relatively small reuse components such as sodium valves, electromagnet flow meters (EMFs) etc., sodium is removed by alcohol process. (author)

  20. Development of the visual inspection system for the top of the tube sheet in steam generators

    International Nuclear Information System (INIS)

    Kim, Gyung Sub; Choi, Sang Hoon; Kim, Ki Chul

    2008-01-01

    Steam Generators at Nuclear Power plants have a important function to isolate Radioactivity between the primary side radioactive fluid running through tubes and the secondary side with non-radioactive fluid through out of a tube bundle, in addition to a function of steam generation. Therefore, To obtain integrity of Steam Generator is really important for safety in the nuclear power plant. At the same time, sludge and foreign objects in steam generators are known as major sources causing the damage of SG tubes. But there is no way to prevent those coming to steam generators until now. Therefore, a periodic inspection and removal of those in steam generators is the only way for those Generally, Most of the Nuclear Power Plants have been inspecting visually every outage for the top of the tube sheet in which sludge and foreign objects lead to the buildup to know how these are

  1. Track 2- major components reliability and materials issues. Some performance indicators of PWR steam generators

    International Nuclear Information System (INIS)

    Milivojevic, S.; Spasojevic, D.; Riznic, J.

    2001-01-01

    The monitoring of operational performance is a crucial aspect of the management of equipment operation and maintenance in many industries, including nuclear and thermal power plants. Monitoring involves the collection and analysis of data on the operation. In these paper an analysis was made of steam generators in operation, i.e., their malfunctions during the plant life cycle with the aim of studying the characteristics of failure rate and repair rate. These values are necessary parameters if we are to determine the reliability and availability of the steam generator as a basis for the analysis of its effect on the safety and efficiency of the nuclear power plant. We analyzed IAEA available data for period from 1971 to 1998. Each steam generator was monitored individually during plants' lifetime. The data on steam generator failures were presented in uniform format, allowing the consistency in failure classification and data reporting. Operational presence of the analyzed steam generators is given for each calendar year and each lifetime year: the failure rate l and repair rate m with associated boundaries are calculated. The general trends in calendar years performance indicators (μ) of steam generators is investigated. The distributions of lifetime l and m are formed, as a complement to the analysis of calendar years performance indicators. With aspect of steam generators influence on reliability and availability of nuclear power plants, the empirical probability distribution for failure rates and repair rates are also constructed. (author)

  2. Upgraded Steam Generator Lancing System for Uljin NPP no.2

    International Nuclear Information System (INIS)

    Kim, Seok Tae; Jeong, Woo Tae; Hong, Sung Yull

    2005-01-01

    KEPRI(Korea Electric Power Research Institute) has developed various types of steam generator lancing systems since 1998. In this paper, we introduce a new lancing system with new improvements from the previous steam generator lancing system for Uljin NPP #2(nuclear power plant) constructed by KEPRI. The previous lancing system is registered as KALANS R -II and was developed for System-80 type steam generators. The previous lancing system was applied to Uljin unit #3 and it lowered radiation exposure of operators in comparison to manually operated lancing systems. And it effectively removed sludge accumulated around kidney bean zone in the Uljin unit #3 steam generators. But the previous lancing system could only clean partially the steam generators of Uljin unit #4. This was because the rail of the previous lancing system interfered with a part of the steam generator. Therefore we developed a new lancing system that can solve the interference problem. This new lancing system was upgraded from the previous lancing system. Also, a new lancing system for System-80 S/G will be introduced in this paper

  3. TRAC analysis of steam-generator overfill transients for TMI-1

    International Nuclear Information System (INIS)

    Bassett, B.

    1983-01-01

    A reactor safety issue concerning the overfilling of once-through steam generators leading to combined primary/secondary blowdown has been raised recently. A series of six calculations, performed with the LWR best-estimate code, TRAC-PD2, on a Babcock and Wilcox Plant (TMI-1), was performed to investigate this safety issue. The base calculation assumed runaway main feedwater to one steam generator causing it to overfill and to break the main steam line. Four additional calculations build onto the base case with combinations of a pump-seal failure, a steam-generator tube rupture, and the pilot-operated relief valve not reseating. A sixth calculation involved only the rupture of a single steam-generator tube. The results of these analyses indicate that for the transients investigated, the emergency cooling system provided an adequate make-up coolant flow to mitigate the accidents

  4. Ultrasonic imaging of tube/support structure of power plant steam generators

    International Nuclear Information System (INIS)

    Saniie, J.; Nagle, D.T.

    1987-01-01

    The corrosion and erosion of steam generator tubing in nuclear power plants can present problems of both safety and economics. In steam generators, the inconel tubes are fit loosely through holes drilled in carbon steel support plates. Corrosion is of particular concern with such tube/support plate structures. Non-protective magnetite can build up on the inner surface of the support plate holes, and allowed to continue unchecked, will fill the gap, eventually denting and fracturing the tube walls. Therefore, periodic nondestructive inspection can be valuable in characterizing corrosion and can be used in evaluating the effectiveness of chemical treatments used to control or reduce corrosion. Presently, they are investigating the feasibility and practicality of using ultrasound in routing testing for gap measurement, for evaluating the corrosion and assessing the degree of denting. The tube/support structure can be modeled as a multilayer, reverberant target, which when tested with ultrasound results in two sets of reverberating echoes [1]. One set corresponds to the tube wall and the other to the support plate. These echoes must be decomposed and identified in order to evaluate the tube/support structure. This report presents experimental results along with a discussion of various measurements and processing techniques for decomposing and interpreting tube/support echoes at different stages of corrosion

  5. Use of self-organizing maps for classification of defects in the tubes from the steam generator of nuclear power plants

    International Nuclear Information System (INIS)

    Mesquita, Roberto Navarro de

    2002-01-01

    This thesis obtains a new classification method for different steam generator tube defects in nuclear power plants using Eddy Current Test signals. The method uses self-organizing maps to compare different signal characteristics efficiency to identify and classify these defects. A multiple inference system is proposed which composes the different extracted characteristic trained maps classification to infer the final defect type. The feature extraction methods used are the Wavelet zero-crossings representation, the linear predictive coding (LPC), and other basic signal representations on time like module and phase. Many characteristic vectors are obtained with combinations of these extracted characteristics. These vectors are tested to classify the defects and the best ones are applied to the multiple inference system. A systematic study of pre-processing, calibration and analysis methods for the steam generator tube defect signals in nuclear power plants is done. The method efficiency is demonstrated and characteristic maps with the main prototypes are obtained for each steam generator tube defect type. (author)

  6. Stress corrosion cracking of steam generator tube and primary pipe in PWR type nuclear power plants

    International Nuclear Information System (INIS)

    Zhang Weiguo; Gao Fengqin; Zhou Hongyi

    1993-01-01

    The behavior of stress corrosion cracking (SCC) is studied by slow strain rate test (SSRT), constant load test (CLT) and low frequency cyclic loading test (LFCLT). The purpose of these tests is to get the test data for evaluating the integrity of pressurized boundary of pipes in Qinshan and Guangdong nuclear power plants. Tested materials are 316 nuclear grade stainless steel (SS) for primary pipes in welded heat affected zone (WHAZ) and steam generator tubes, such as Incoloy-800, Inconel-600, Inconel-690 and 321 SS which are used for steam generator in PWR. The effects of material metallurgy, shot-peening treatment, tensile load, strain rate, cyclic load and water chemistry on the behavior of SCC are investigated

  7. Plant for the delivery of long-distance steam combined with a nuclear power plant

    International Nuclear Information System (INIS)

    Schueller, K.H.

    1976-01-01

    It is proposed that long-distance steam should not be directly discharged in order to avoid each posibility of spreading radioactively contaminated steam. As a heat transmitter, a surface heat exchanger should be chosen, the heating steam of the nuclear power station heating pressurized water whose pressure is higher then that of the heating steam. Long-distance steam generation then results from expanding the pressurized water. The plant is described in detail. (UWI) [de

  8. Automatic system for redistributing feedwater in a steam generator of a nuclear power plant

    International Nuclear Information System (INIS)

    Fuoto, J.S.; Crotzer, M.E.; Lang, G.E.

    1980-01-01

    A system is described for automatically redistributing a steam generator secondary tube system after a burst in the secondary tubing. This applies to a given steam generator in a system having several steam generators partially sharing a common tube system, and employs a pressure control generating an electrical signal which is compared with given values [fr

  9. Steam generators - problems and prognosis

    International Nuclear Information System (INIS)

    Tapping, R.L.

    1997-05-01

    Steam-generator problems, largely a consequence of corrosion and fouling, have resulted in increased inspection requirements and more regulatory attention to steam-generator integrity. In addition, utilities have had to develop steam-generator life-management strategies, including cleaning and replacement, to achieve design life. This paper summarizes the pertinent data to 1993/1994, and presents an overview of current steam-generator management practices. (author)

  10. Development of KALANS to remove sludge of steam generator

    International Nuclear Information System (INIS)

    Jeong, W. T.; Yang, J. S.; You, G. W.; Sung, G. B.; Kim, B. Y.

    1999-01-01

    CECIL -4 lancing system by Foster-Miller has been used for the secondary side landing of Westinghouse type steam generators (YGN No. 1,2 and Kori No. 1,2,3,4) in Korean nuclear power plants. Shared use of only one lancing system for the 6 nuclear power plants required frequent transportation of the system from Nori to Youngkwang which may cause malfunction of sophisticated control equipment. Sometimes, the overlap in preventive maintenance schedule of nuclear power plants prevented the plant maintenance personnel from doing sufficient lancing work. Purchasing a new lancing system may be a candidate for this problem, but the price tag is surprisingly high. Furthermore, prompt maintenance was another serious problem because the manufacturer is far away in a foreign country. Last year, the steam generator of Kori No. 1 was changed to Δ60. The difference in the tube arrangement of the new steam generator made it impossible to use the CECIL system. Sufficient technological background of our development team and the conclusion that the development project is economically feasible made us to commence the design and fabrication of 'KEPCO Advanced LANcing System - KALANS.' This paper presents the state of the art on lancing system and the developed concept and design of KALANS

  11. Strategy for assessment of WWER steam generator tube integrity. Report prepared within the framework of the coordinated research project on verification of WWER steam generator tube integrity

    International Nuclear Information System (INIS)

    2007-12-01

    Steam generator heat exchanger tube degradations happen in WWER Nuclear Power Plant (NPP). The situation varies from country to country and from NPP to NPP. More severe degradation is observed in WWER-1000 NPPs than in case of WWER-440s. The reasons for these differences could be, among others, differences in heat exchanger tube material (chemical composition, microstructure, residual stresses), in thermal and mechanical loadings, as well as differences in water chemistry. However, WWER steam generators had not been designed for eddy current testing which is the usual testing method in steam generators of western PWRs. Moreover, their supplier provided neither adequate methodology and criteria nor equipment for planning and implementing In-Service Inspection (ISI). Consequently, WWER steam generator ISI infrastructure was established with delay. Even today, there are still big differences in the eddy current inspection strategy and practice as well as in the approach to steam generator heat exchanger tube structural integrity assessment (plugging criteria for defective tubes vary from 40 to 90% wall thickness degradation). Recognizing this situation, the WWER operating countries expressed their need for a joint effort to develop methodology to establish reasonable commonly accepted integrity assessment criteria for the heat exchanger tubes. The IAEA's programme related to steam generator life management is embedded into the systematic activity of its Technical Working Group on Life Management of Nuclear Power Plants (TWG-LMNPP). Under the advice of the TWG-LMNPP, an IAEA coordinated research project (CRP) on Verification of WWER Steam Generator Tube Integrity was launched in 2001. It was completed in 2005. Thirteen organizations involved in in-service inspection of steam generators in WWER operating countries participated: Croatia, Czech Republic, Finland, France, Hungary, Russian Federation, Slovakia, Spain, Ukraine, and the USA. The overall objective was to

  12. Design of SMART steam generator cassette

    International Nuclear Information System (INIS)

    Kim, Y. W.; Kim, J. I.; Jang, M. H.

    2001-01-01

    Basic design development for the steam generator to be installed in the integral reactor SMART has been performed. Optimization of the steam generator shape, determination of the basic dimension and confirmation of the structural strength have been carried out. Individual steam generator cassette can be replaced in the optimized design concept of steam generator. Shape design of the steam generator cassette has been done on the computer based on 3-D CAE strategy. The structural integrity of the developed steam generator was investigated by performing the dynamic analysis for the steam generator cassette, flow induced vibration analysis for the tube bundle, and the thermo-mechanical analysis for the module header and tube. As for the manufacturing of steam generator, the numerical and the experimental simulation have been carried to control the amount of spring back and to eliminate residual stress. SMART steam generator cassette was developed by a sequential research of the aforementioned activities

  13. Effects of Chemistry Parameters of Primary Water affecting Leakage of Steam Generator Tube Cracks

    Energy Technology Data Exchange (ETDEWEB)

    Shin, D. M.; Cho, N. C.; Kang, Y. S.; Lee, K. H. [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Degradation of steam generator (SG) tubes can affect pressure boundary tightness. As a defense-in-depth measure, primary to secondary leak monitoring program for steam generators is implemented, and operation is allowed under leakage limits in nuclear power plants. Chemistry parameters that affect steam generator tube leakage due to primary water stress corrosion cracking (PWSCC) are investigated in this study. Tube sleeves were installed to inhibit leakage and improve tube integrity as a part of maintenance methods. Steam generators occurred small leak during operation have been replaced with new steam generators according to plant maintenance strategies. The correlations between steam generator leakage and chemistry parameters are presented. Effects of primary water chemistry parameters on leakage from tube cracks were investigated for the steam generators experiencing small leak. Unit A experienced small leakage from steam generator tubes in the end of operation cycle. It was concluded that increased solubility of oxides due to high pHT could make leakage paths, and low boron concentration lead to less blockage in cracks. Increased dissolved hydrogen may retard crack propagations, but it did not reduce leak rate of the leaking steam generator. In order to inhibit and reduce leakage, pH{sub T} was controlled by servicing cation bed operation. The test results of decreasing pHT indicate low pHT can reduce leak rate of PWSCC cracks in the end of cycle.

  14. Effects of Chemistry Parameters of Primary Water affecting Leakage of Steam Generator Tube Cracks

    International Nuclear Information System (INIS)

    Shin, D. M.; Cho, N. C.; Kang, Y. S.; Lee, K. H.

    2016-01-01

    Degradation of steam generator (SG) tubes can affect pressure boundary tightness. As a defense-in-depth measure, primary to secondary leak monitoring program for steam generators is implemented, and operation is allowed under leakage limits in nuclear power plants. Chemistry parameters that affect steam generator tube leakage due to primary water stress corrosion cracking (PWSCC) are investigated in this study. Tube sleeves were installed to inhibit leakage and improve tube integrity as a part of maintenance methods. Steam generators occurred small leak during operation have been replaced with new steam generators according to plant maintenance strategies. The correlations between steam generator leakage and chemistry parameters are presented. Effects of primary water chemistry parameters on leakage from tube cracks were investigated for the steam generators experiencing small leak. Unit A experienced small leakage from steam generator tubes in the end of operation cycle. It was concluded that increased solubility of oxides due to high pHT could make leakage paths, and low boron concentration lead to less blockage in cracks. Increased dissolved hydrogen may retard crack propagations, but it did not reduce leak rate of the leaking steam generator. In order to inhibit and reduce leakage, pH_T was controlled by servicing cation bed operation. The test results of decreasing pHT indicate low pHT can reduce leak rate of PWSCC cracks in the end of cycle

  15. Technical study of real-time simulation system for digital I and C system of steam generator in nuclear power plant

    International Nuclear Information System (INIS)

    Shi Ji; Jiang Mingyu; Ma Yunqin

    2004-01-01

    The real-time simulation system, which forms a interactive closed circle together with the steam generator control system, has been developed using a dynamic mathematical model of steam generator in this paper. It can provide a simulation target for upgrades of digital Instrument and Control system in Nuclear Power Plant (NPP) and is applicable for further research of control schemes. With this program, the authors have studied and analyzed the response of transient parameters to some different disturbance, the calculated results are in good agreement with those calculated by NPP simulator program. This will give a theoretical analysis for upgrades of digital I and C system in nuclear power plant

  16. A reflux capsule steam generator for sodium cooled reactors

    International Nuclear Information System (INIS)

    Lantz, E.

    Pressurized water reactor plants at numerous sites have sustained significant leakage through their steam generators. The consequent shutdowns for repairs and replacements have damaged their economics. This experience suggests that if steam generators for liquid metal fast breeder reactors (LMFBR's) continue to be built as presently designed some of them will have similar problems. Because of their larger capital investment, the consequent damage to the economics of LMFBR's could be more serious. Reflux capsules provide a way to separate sodium from water and to reduce thermal stresses in steam generators for sodium cooled reactors. Their use would also eliminate the need for a primary heat exchanger and a secondary sodium loop pump. (author)

  17. Evaluation of Hybrid Power Plants using Biomass, Photovoltaics and Steam Electrolysis for Hydrogen and Power Generation

    Science.gov (United States)

    Petrakopoulou, F.; Sanz, J.

    2014-12-01

    Steam electrolysis is a promising process of large-scale centralized hydrogen production, while it is also considered an excellent option for the efficient use of renewable solar and geothermal energy resources. This work studies the operation of an intermediate temperature steam electrolyzer (ITSE) and its incorporation into hybrid power plants that include biomass combustion and photovoltaic panels (PV). The plants generate both electricity and hydrogen. The reference -biomass- power plant and four variations of a hybrid biomass-PV incorporating the reference biomass plant and the ITSE are simulated and evaluated using exergetic analysis. The variations of the hybrid power plants are associated with (1) the air recirculation from the electrolyzer to the biomass power plant, (2) the elimination of the sweep gas of the electrolyzer, (3) the replacement of two electric heaters with gas/gas heat exchangers, and (4) the replacement two heat exchangers of the reference electrolyzer unit with one heat exchanger that uses steam from the biomass power plant. In all cases, 60% of the electricity required in the electrolyzer is covered by the biomass plant and 40% by the photovoltaic panels. When comparing the hybrid plants with the reference biomass power plant that has identical operation and structure as that incorporated in the hybrid plants, we observe an efficiency decrease that varies depending on the scenario. The efficiency decrease stems mainly from the low effectiveness of the photovoltaic panels (14.4%). When comparing the hybrid scenarios, we see that the elimination of the sweep gas decreases the power consumption due to the elimination of the compressor used to cover the pressure losses of the filter, the heat exchangers and the electrolyzer. Nevertheless, if the sweep gas is used to preheat the air entering the boiler of the biomass power plant, the efficiency of the plant increases. When replacing the electric heaters with gas-gas heat exchangers, the

  18. Dual turbine power plant and method of operating such plant, especially one having an HTGR steam supply

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegtnes, K.O.

    1977-01-01

    A power plant including dual steam turbine-generators connected to pass superheat and reheat steam from a steam generator which derives heat from the coolant gas of a high temperature gas-cooled nuclear reactor is described. Associated with each turbine is a bypass line to conduct superheat steam in parallel with a high pressure turbine portion, and a bypass line to conduct superheat steam in parallel with a lower pressure turbine portion. Auxiliary steam turbines pass a portion of the steam flow to the reheater of the steam generator and drive gas blowers which circulate the coolant gas through the reactor and the steam source. Apparatus and method are disclosed for loading or unloading a turbine-generator while the other produces a steady power output. During such loading or unloading, the steam flows through the turbine portions are coordinated with the steam flows through the bypass lines for protection of the steam generator, and the pressure of reheated steam is regulated for improved performance of the gas blowers. 33 claims, 5 figures

  19. Planning of the steam generators for nuclear applications using optimization techniques

    International Nuclear Information System (INIS)

    Sakai, M.; Silvares, O.M.

    1978-01-01

    Procedure for the maximization of the net power of a nuclear power plant through the application of the optimal control theory of dynamic systems is presented. The problem is formulated in the steam generator which links the primary and the secondary cycle. The solution of the steam generator, optimization problem is obtained simultaneously with the heat balance in both primary and secondary cycle, through an iterative process. By this way the optimal parameters are obtained for the steam generator, the vapor and the cooling gas cycle [pt

  20. Design of segmental ultrasonic cleaning equipment for removing the sludge in a steam generator

    International Nuclear Information System (INIS)

    Kim, Seok Tae; Jeong, Woo Tae; Byeon, Min Suk; Lee, Ho One

    2010-01-01

    In nuclear power plants, the water in the coolant system is managed to be clean but metallic sludge is accumulated on the top of tube-sheet in a steam generator. The sludge causes the corrosion of the tubesheet. The electric utility company in Korea removes the sludge with a lancing system for every outage of nuclear power plants. But the sludge is not perfectly removed with lancing system because the pressurized water of the lancing system cannot reach all area in a steam generator. Therefore the steam generator cleaning system with ultrasonic energy has been developed in KEPCO Research Institute. In this paper, the ultrasonic cleaning system is designed for removing the sludge on the steam generator

  1. Modelling of WWER-1000 steam generators by REALP5/MOD3.2 code

    Energy Technology Data Exchange (ETDEWEB)

    D`Auria, F.; Galassi, G.M. [Univ. of Pisa (Italy); Frogheri, M. [Univ. of Genova (Italy)

    1997-12-31

    The presentation summarises the results of best estimate calculations carried out with reference to the WWER-1000 Nuclear Power Plant, utilizing a qualified nodalization set-up for the Relap5/Mod3.2 code. The nodalization development has been based on the data of the Kozloduy Bulgarian Plant. The geometry of the steam generator imposed drastic changes in noding philosophy with respect to what is suitable for the U-tubes steam generators. For the secondary side a symmetry axis was chosen to separate (in the nodalization) the hot and the cold sides of the tubes. In this way the secondary side of the steam generators was divided into three zones: (a) the hot zone including the hot collector and the hot l/2 parts of the tubes; (b) the cold zone including the cold collector and the cold 1/2 parts of the tubes; (c) the downcomer region, where down flow is assumed. As a consequence of above in the primary side more nodes are placed on the hot side of the tubes. Steady state and transient qualification has been achieved, considering the criteria proposed at the University of Pisa, utilizing plant transient data from the Kozloduy and the Ukrainian Zaporosche Plants. The results of the application of the qualified WWER-1000 Relap5/Mod3.2 nodalization to various transients including large break LOCA, small break LOCA and steam generator tube rupture, together with a sensitivity analysis on the steam generators, are reported in the presentation. Emphasis is given to the prediction of the steam generators performances. 23 refs.

  2. Modelling of WWER-1000 steam generators by REALP5/MOD3.2 code

    Energy Technology Data Exchange (ETDEWEB)

    D` Auria, F; Galassi, G M [Univ. of Pisa (Italy); Frogheri, M [Univ. of Genova (Italy)

    1998-12-31

    The presentation summarises the results of best estimate calculations carried out with reference to the WWER-1000 Nuclear Power Plant, utilizing a qualified nodalization set-up for the Relap5/Mod3.2 code. The nodalization development has been based on the data of the Kozloduy Bulgarian Plant. The geometry of the steam generator imposed drastic changes in noding philosophy with respect to what is suitable for the U-tubes steam generators. For the secondary side a symmetry axis was chosen to separate (in the nodalization) the hot and the cold sides of the tubes. In this way the secondary side of the steam generators was divided into three zones: (a) the hot zone including the hot collector and the hot l/2 parts of the tubes; (b) the cold zone including the cold collector and the cold 1/2 parts of the tubes; (c) the downcomer region, where down flow is assumed. As a consequence of above in the primary side more nodes are placed on the hot side of the tubes. Steady state and transient qualification has been achieved, considering the criteria proposed at the University of Pisa, utilizing plant transient data from the Kozloduy and the Ukrainian Zaporosche Plants. The results of the application of the qualified WWER-1000 Relap5/Mod3.2 nodalization to various transients including large break LOCA, small break LOCA and steam generator tube rupture, together with a sensitivity analysis on the steam generators, are reported in the presentation. Emphasis is given to the prediction of the steam generators performances. 23 refs.

  3. Eddy-current tests on operational evaluation of steam generator tubes in nuclear power plants

    International Nuclear Information System (INIS)

    Lopez, Luiz Antonio Negro Martin; Ting, Daniel Kao Sun

    2000-01-01

    This paper presents a worldwide research on the technical and economical impacts due to failure in tube bundles of nuclear power plant steam generators. An Eddy current non destructive test using Foucault currents for the inspection and failure detection on the tubes, and also the main type of defects. The paper also presents the signals generated by a Zetec MIZ-40 test equipment. This paper also presents a brief description of an automatic system for data analysis which is under development by using a fuzzy logic and artificial intelligence

  4. Surry Power Station secondary water chemistry improvement since steam generator replacement and the unit two feedwater pipe rupture

    International Nuclear Information System (INIS)

    Swindell, E.T.

    1988-01-01

    Surry Power Station has two Westinghouse-designed three-loop PWRs of 811 MWe design rating. The start of commercial operation was in July, 1972 in No.1 plant, and May, 1973 in No.2 plant. Both plants began the operation using controlled phosphate chemistry for the steam generators. In 1975, both plants were converted to all volatile treatment on the secondary side due to the tube wall thinning corrosion in the steam generators, which was associated with the phosphate sludge that was building up on the tube sheets and created acidic condition. Thereafter, condenser and air leakage and steam generator denting occurred, and after the operation of 8 years 2 month of No.1 plant and 5 years 9 months of No.2 plant, the steam generators were replaced. A major plant improvement program was designed and implemented from 1979 to 1980. The improvement in new steam generators, the modification for preventing corrosion, the addition of a steam generator blowdown recovery system, the reconstruction of condensers, the installation of full flow, deep bed condensate polishers, the addition of Dionex 8,000 on-line ion chromatograph, a long term maintenance agreement with Westinghouse and so on are reported. (Kako, I.)

  5. Signal validation and failure correction algorithms for PWR steam generator feedwater control

    International Nuclear Information System (INIS)

    Nasrallah, C.N.; Graham, K.F.

    1986-01-01

    A critical contributor to the reliability of a nuclear power plant is the reliability of the control systems which maintain plant operating parameters within desired limits. The most difficult system to control in a PWR nuclear power plant and the one which causes the most reactor trips is the control of the feedwater flow to the steam generators. The level in the steam generator must be held within relatively narrow limits, with reactor trips set for both too high and too low a level. The steam generator level is inherently unstable in that it is an open integrator of feedwater flow steam flow mismatch. The steam generator feedwater control system relies on sensed variables in order to generate the appropriate feedwater valve control signal. In current systems, each of these sensed variables comes from a single sensor which may be a separate control sensor or one of the redundant protection sensors that is manually selected by the operator. In case this single signal is false, either due to sensor malfunction or due to a test signal being substituted during periodic test and maintenance, the control system will generate a wrong control signal to the feedwater control valve. This will initiate a steam generator level upset. The solution to this problem is for the control system to sense a given variable with more than one redundant sensor. Normally there are three or four sensors for each variable monitored by the reactor protection system. The techniques discussed allow the control system to compare these redundant sensor signals and generate a validated signal for each measured variable that is insensitive to false signals

  6. Safety analysis program for steam generators replacement and power uprate at Tihange 2 nuclear power plant

    International Nuclear Information System (INIS)

    Delhaye, X.; Charlier, A.; Damas, Ph.; Druenne, H.; Mandy, C.; Parmentier, F.; Pirson, J.; Zhang, J.

    2002-01-01

    The Belgian Tihange 2 nuclear power plant went into commercial operation in 1983 producing a thermal power of 2785 MW. Since the commissioning of the plant the steam generators U-tubes have been affected by primary stress corrosion cracking. In order to avoid further degradation of the performance and an increase in repair costs, Electrabel, the owner of the plant, decided in 1997 to replace the 3 steam generators. This decision was supported by the feasibility study performed by Tractebel Energy Engineering which demonstrated that an increase of 10% of the initial power together with a fuel cycle length of 18 months was achieved. Tractebel Energy Engineering was entrusted by Electrabel as the owner's engineer to manage the project. This paper presents the role of Tractebel Energy Engineering in this project and the safety analysis program necessary to justify the new operation point and the fuel cycle extension to 18 months re-analysis of FSAR chapter 15 accidents and verification of the capacity of the safety and auxiliary systems. The FSAR chapter 15 accidents were reanalyzed jointly by Framatome and Tractebel Energy Engineering while the systems verifications were carried out by Tractebel Energy Engineering. (author)

  7. Radiological protection for the ANGRA 1 steam generator replacement outage

    International Nuclear Information System (INIS)

    Oliveira, Magno Jose de; Amaral, Marcos Antonio do; Minelli, Edson; Ferreira, William Alves

    2009-01-01

    The Angra 1 Nuclear Power Plant (NPP) is a Westinghouse two-loop plant with net output before its 1P16 Outage of 632 MWe, with the Old Steam Generators (OSG) type model D3, which were replaced by two new Steam Generators with feed water-ring system. Localized in Angra dos Reis, Rio de Janeiro - Brazil, Angra 1 started in commercial operation in 1985 and, from the beginning problems related to corrosion have appeared in the Inconel 600 alloy of the tubes. The corrosion problems indicated the necessity for a strong control of the tubes thicknesses and, after a time, the ELETRONUCLEAR decided to replace the OSG. In 2009, ELETRONUCLEAR initiated in January 24, the actions for the Steam Generators Replacement - SGR. During the SGR process, several controls were applied in field, which made possible to have no radiological accidents, no dose limits exceeded, and permitted to achieve a very good result in terms of Collective Dose. This paper describes the radiological controls applied for the Angra 1 Steam Generator Replacement Outage, the radiological protection team sizing and distribution and the obtained results. (author)

  8. Steam generators, turbines, and condensers. Volume six

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Volume six covers steam generators (How steam is generated, steam generation in a PWR, vertical U-tube steam generators, once-through steam generators, how much steam do steam generators make?), turbines (basic turbine principles, impulse turbines, reaction turbines, turbine stages, turbine arrangements, turbine steam flow, steam admission to turbines, turbine seals and supports, turbine oil system, generators), and condensers (need for condensers, basic condenser principles, condenser arrangements, heat transfer in condensers, air removal from condensers, circulating water system, heat loss to the circulating water system, factors affecting condenser performance, condenser auxiliaries)

  9. Maintenance and repair aspects of the steam generator modules for the United States' LMFBR demonstration plant

    Energy Technology Data Exchange (ETDEWEB)

    Devlin, R W

    1975-07-01

    This paper describes the main considerations relating to the field maintenance and repair of the steam generator modules for the Clinch River Breeder Reactor Plant and the development approaches being employed for some of the critical elements of these operations. In particular, the approach to plant chemical cleaning of the waterside of the modules and the approach to recovery from leaks between the water and sodium sides of the modules are discussed. (author)

  10. Maintenance and repair aspects of the steam generator modules for the United States' LMFBR demonstration plant

    International Nuclear Information System (INIS)

    Devlin, R.W.

    1975-01-01

    This paper describes the main considerations relating to the field maintenance and repair of the steam generator modules for the Clinch River Breeder Reactor Plant and the development approaches being employed for some of the critical elements of these operations. In particular, the approach to plant chemical cleaning of the waterside of the modules and the approach to recovery from leaks between the water and sodium sides of the modules are discussed. (author)

  11. Heysham II/Torness AGR steam generator

    International Nuclear Information System (INIS)

    Charcharos, A.N.; Wood, M.B.; Glasgow, J.R.

    1988-01-01

    The AGR Steam Generators for Heysham II and Torness Power Stations have been installed at site and are being operated in the initial low temperature commissioning plant engineering tests. In this paper a description of the high pressure once-through steam generators together with layout arrangements, materials employed, operating parameters, plant operating conditions and constraints is given. An outline of the development of the design through thermo-hydraulic considerations, mechanical design, instrumentation to component testing is presented. Special features of the design directed to accommodate such requirements as seismic loadings, waterside static and dynamic stability, gas flow induced vibration, thermal expansions are described in detail. The fabrication facilities employed and techniques selected and developed for the manufacture and assembly of the heating surfaces are presented. These include welding processes, tube manipulation and heat treatment with details of the automation applied to the processes. Operating experience in the early commissioning plant engineering tests at Site is described with an emphasis on those tests which provide the final confirmation of the design prior to operation at full load. The paper concludes with a description of the outstanding commissioning activities up to raise power. (author)

  12. Heysham II/Torness AGR steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Charcharos, A N [National Nuclear Corporation Ltd., Knutsford (United Kingdom); Wood, M B; Glasgow, J R [NEI Power Projects Ltd., Gateshead (United Kingdom)

    1988-07-01

    The AGR Steam Generators for Heysham II and Torness Power Stations have been installed at site and are being operated in the initial low temperature commissioning plant engineering tests. In this paper a description of the high pressure once-through steam generators together with layout arrangements, materials employed, operating parameters, plant operating conditions and constraints is given. An outline of the development of the design through thermo-hydraulic considerations, mechanical design, instrumentation to component testing is presented. Special features of the design directed to accommodate such requirements as seismic loadings, waterside static and dynamic stability, gas flow induced vibration, thermal expansions are described in detail. The fabrication facilities employed and techniques selected and developed for the manufacture and assembly of the heating surfaces are presented. These include welding processes, tube manipulation and heat treatment with details of the automation applied to the processes. Operating experience in the early commissioning plant engineering tests at Site is described with an emphasis on those tests which provide the final confirmation of the design prior to operation at full load. The paper concludes with a description of the outstanding commissioning activities up to raise power. (author)

  13. Research perspectives on the evaluation of steam generator tube integrity

    International Nuclear Information System (INIS)

    Muscara, J.; Diercks, D.R.; Majumdar, S.; Kupperman, D.S.; Bakhtiari, S.; Shack, W.J.

    2002-01-01

    Industry efforts have been largely successful in managing degradation of steam generator tubes due to wastage, pitting, and denting, but fretting, stress corrosions cracking (SCC) and intergranular attack have proved more difficult to manage. Although steam generator replacements are proceeding, there is substantial industry interest in operating with degraded steam generators, and significant numbers of plants will continue to do so. In most cases degradation of steam generator tubing by stress corrosion cracking is still managed by 'plug or repair on detection' because current NDE techniques for characterization of flaws and the knowledge of SCC crack growth rates are not accurate enough to permit continued operation. Replacement generators with improved designs and materials have performed well to date, but previous experience with the appearance of some types of SCC in Alloy 600 after 10 years or more of operation and laboratory results suggest additional understanding of corrosion performance of these materials is needed. This paper reviews some of the historical background that underlies current steam generator degradation management strategies and outlines some of the additional research that must be done to provide more effective management of degradation in current generators and provide greater assurance of satisfactory performance in replacement steam generators. (author)

  14. The residual stress evaluation for expansion process of steam generator tubes

    International Nuclear Information System (INIS)

    King, C.-S.; Lee, S.-C.; Shim, D.-N.

    2004-01-01

    The reliability of a nuclear power plant is affected by the reliability of steam generator tube and the reliability of steam generator tube is affected by stress corrosion cracking(SCC). Many steam generator tubes were experiencing stress corrosion cracking and stress corrosion cracking is affected material characteristics, corrosive environments and added stresses. The added stresses have the manufacturing stresses and operating stresses, the manufacturing stresses include the residual stresses generating in the tube manufacture and tube expanding procedure. We will investigate for influence which affected to residual stresses with tube plastic deformation method and measurement region. (author)

  15. Scale Thickness Measurement of Steam Generator Tubing Using Eddy Current Signal of Bobbin Coil

    International Nuclear Information System (INIS)

    Kim, Chang Soo; Um, Ki Soo; Kim, Jae Dong

    2012-01-01

    Steam generator is one of the major components of nuclear power plant and steam generator tubes are the pressure boundary between primary and secondary side, which makes them critical for nuclear safety. As the operating time of nuclear power plant increases, not only damage mechanisms but also scaled deposits on steam generator tubes are known to be problematic causing tube support flow hole blockage and heat fouling. The ability to assess the extent and location of scaled deposits on tubes became essential for management and maintenance of steam generator and eddy current bobbin data can be utilized to measure thickness of scale on tubes. In this paper, tube reference standards with various thickness of scaled deposit has been set up to provide information about the overall deposit condition of steam generator tubes, providing essential tool for steam generator management and maintenance to predict and prevent future damages. Also, methodology to automatically measure scale thickness on tubes has been developed and applied to field data to estimate overall scale amount.

  16. Corrosion problems of PWR steam generators

    International Nuclear Information System (INIS)

    Urbancik, L.; Kostal, M.

    Literature data are assessed on corrosion failures of steam generator tubes made of INCONEL 600 or INCOLOY 800. It was found that both alloys with high nickel content showed good stability in a corrosion environment while being sensitive to carbide formation on grain boundaries. The gradual depletion of chromium results from the material and corrosion resistance deteriorates. INCOLOY 800 whose chromium carbide precipitation on grain boundaries in pure water and steam is negligible up to 75O degC and which is not subject to corrosion attacks in the above media and in an oxidizing environment at a temperature to about 700 degC shows the best corrosion resistance. Its favourable properties were tested in long-term operation in the Peach Bottom 1 nuclear power plant where no failures due to corrosion of this material have been recorded since 1967. In view of oxygenic-acid surface corrosion, it is necessary to work in a neutral or slightly basic environment should any one of the two alloys be used for steam generator construction. The results are summed up of an analysis conducted for the Beznau I NOK reactor. Water treatment with ash-free amines can be used as prevention against chemical corrosion mechanisms, although the treatment itself does not ensure corrosion resistance of steam generator key components. (J.B.)

  17. Dynamic simulation of steam generator failures

    Energy Technology Data Exchange (ETDEWEB)

    Meister, G [Institut fuer Nukleare Sicherheitsforschung, Kernforschungsanlage Juelich GmbH, Juelich (Germany)

    1988-07-01

    A computer program will be described which is capable to simulate severe transients in a gas heated steam generator. Such transients may arise in the safety analysis of accidents resulting from failures in the heat removal system of an HTGR power plant. Important failure modes which have to be considered are ruptures of one or more steam generator tubes leading to water or steam ejection into the primary system or anomalous operating conditions which my cause damage due to excessive thermal stress. Examples are the complete dryout as a consequence of feedwater interrupt in connection with continuing gas heating and the reflooding of the secondary channel with cold feedwater after dryout. The steam generator program which is capable to simulate accidents of this type is written as a module which can be implemented into a program system fur the simulation of the total heat rejection system. It based on an advanced mathematical model for the two phase flow taking deviations from thermal equilibrium into account. Mass, energy and momentum balances for the primary and secondary fluid and the heat diffusion equations for the heat exchanging wall form a system of coupled differential equations which is solved numerically by an algorithm which is stiffly stable and suppresses effectively oscillations of numerical origin. Results of the simulation of transients of the type mentioned above will be presented and discussed. (author)

  18. Dynamic simulation of steam generator failures

    International Nuclear Information System (INIS)

    Meister, G.

    1988-01-01

    A computer program will be described which is capable to simulate severe transients in a gas heated steam generator. Such transients may arise in the safety analysis of accidents resulting from failures in the heat removal system of an HTGR power plant. Important failure modes which have to be considered are ruptures of one or more steam generator tubes leading to water or steam ejection into the primary system or anomalous operating conditions which my cause damage due to excessive thermal stress. Examples are the complete dryout as a consequence of feedwater interrupt in connection with continuing gas heating and the reflooding of the secondary channel with cold feedwater after dryout. The steam generator program which is capable to simulate accidents of this type is written as a module which can be implemented into a program system fur the simulation of the total heat rejection system. It based on an advanced mathematical model for the two phase flow taking deviations from thermal equilibrium into account. Mass, energy and momentum balances for the primary and secondary fluid and the heat diffusion equations for the heat exchanging wall form a system of coupled differential equations which is solved numerically by an algorithm which is stiffly stable and suppresses effectively oscillations of numerical origin. Results of the simulation of transients of the type mentioned above will be presented and discussed. (author)

  19. Investigation of separation and hydrodynamic characteristics of steam generators used at the NPPs running on PWR-1000 reactors

    International Nuclear Information System (INIS)

    Ageev, A.G.; Korolkov, B.M.; Nigmatulin, B.I.; Vasileva, R.V.; Nekrasov, A.V.; Titiv, V.F.; Tarankov, G.A.

    1997-01-01

    The tests were accomplished at the steam generator of unit 5 of the Novovoronezh nuclear power plant. The outbursts of the steam-water mixture from the gap between the steam generator housing and the submerged perforated screen rim at the side of the inlet coolant manifold were investigated. Tests of the steam generator with a modified steam separation system were carried out on the Balakovo nuclear power plant. The gilled separator of the steam generator was replaced with a steam collecting perforated screen, while the gap between the steam generator housing and the heat exchange bundle rim was closed with additional perforated screens at the side of the inlet manifold. This new solution of moisture separation is better. (M.D.)

  20. Steam power plant

    International Nuclear Information System (INIS)

    Campbell, J.W.E.

    1981-01-01

    This invention relates to power plant forced flow boilers operating with water letdown. The letdown water is arranged to deliver heat to partly expanded steam passing through a steam reheater connected between two stages of the prime mover. (U.K.)

  1. CANDU steam generator life management

    International Nuclear Information System (INIS)

    Tapping, R.L.; Nickerson, J.; Spekkens, P.; Maruska, C.

    1998-01-01

    Steam generators are a critical component of a nuclear power reactor, and can contribute significantly to station unavailability, as has been amply demonstrated in Pressurized Water Reactors (PWRs). CANDU steam generators are not immune to steam generator degradation, and the variety of CANDU steam generator designs and tube materials has led to some unexpected challenges. However, aggressive remedial actions, and careful proactive maintenance activities, have led to a decrease in steam generator-related station unavailability of Canadian CANDUs. AECL and the CANDU utilities have defined programs that will enable existing or new steam generators to operate effectively for 40 years. Research and development work covers corrosion and mechanical degradation of tube bundles and internals, chemistry, thermalhydraulics, fouling, inspection and cleaning, as well as provision for specially tool development for specific problem solving. A major driving force is development of CANDU-specific fitness-for-service guidelines, including appropriate inspection and monitoring technology to measure steam generator condition. Longer-range work focuses on development of intelligent on-line monitoring for the feedwater system and steam generator. New designs have reduced risk of corrosion and fouling, are more easily inspected and cleaned, and are less susceptible to mechanical damage. The Canadian CANDU utilities have developed programs for remedial actions to combat degradation of performance (Gentilly-2, Point Lepreau, Bruce A/B, Pickering A/B), and have developed strategic plans to ensure that good future operation is ensured. The research and development program, as well as operating experience, has identified where improvements in operating practices and/or designs can be made in order to ensure steam generator design life at an acceptable capacity factory. (author)

  2. Update of operations with Westinghouse steam generators

    International Nuclear Information System (INIS)

    Malinowski, D.D.; Fletcher, W.D.

    1978-01-01

    Westinghouse commercial steam generators in operation now number 112, of which 98 are tubed with Inconel 600, the remainder with stainless steel. The implementation of all volatile treatment (AVT) was reported. It was noted that several plants had exhibited some tube corrosion during their initial periods using AVT; this observation indicated that the transition from phosphate chemistry control to AVT may have been subject to certain residual effects due to incomplete removal of phosphated deposits. As inspection results from steam generators operated on AVT became more generally available with the passage of time, a pattern of results emerged that seemed to correlate with the operating experience with phosphate chemistry control. Specifically, all the plants that experienced corrosion problems had from 1 to 8 yr of operational history using phosphates, while those with less than a year's experience using phosphates tended to be less affected by corrosion problems

  3. Dynamic model of YGN 3 and 4 steam generators for natural circulation mode

    International Nuclear Information System (INIS)

    Sohn, Jong Joo

    1995-02-01

    A dynamic model for the secondary side of Yonggwang nuclear power plant units 3 and 4 (YGN 3 and 4) steam generator model is developed to improve the accuracy of the present performance analysis code. The new model is based on the one-dimensional three region model to predict the local quality and void fraction distribution along the U-tube length. The local quality concept is used instead of the Wilson bubble rise correlation to simulate the steam generators in the natural circulation mode. The new model can be applicable to the plants in the power operation modes such as load maneuvering transients in which the steam generator internal flow is maintained in the natural circulation mode. To validate the new model, the code predictions are compared with the actual plant data measured for the selected load maneuvering tests performed during the YGN units 3 power ascension test period. The results from the improved model show better agreement with the plant data than those from the present code. Especially, the new model's capability of accurately simulating the steam generator water level behavior during the fast transients such as a large load rejection event is demonstrated

  4. Erosion-corrosion entrainment of iron-containing compounds as a source of deposits in steam generators used at nuclear power plants equipped with VVER reactors

    Science.gov (United States)

    Tomarov, G. V.; Shipkov, A. A.

    2011-03-01

    The main stages and processes through which deposits are generated, migrate, and precipitate in the metal-secondary coolant system of power units at nuclear power plants are analyzed and determined. It is shown that substances produced by the mechanism of general erosion-corrosion are the main source of the ionic-colloid form of iron, which is the main component of deposits in a steam generator. Ways for controlling the formation of deposits in a nuclear power plant's steam generator are proposed together with methods for estimating their efficiency.

  5. Power plant and system for accelerating a cross compound turbine in such plant, especially one having an HTGR steam supply

    International Nuclear Information System (INIS)

    Jaegtnes, K.O.; Braytenbah, A.S.

    1979-01-01

    In accordance with the present invention, a power plant includes a steam source to generate superheat and reheat steam which flows through a turbine-generator and an associated bypass system. A high-pressure and an intermediate-pressure turbine portion drive a first electrical generating means, and a low-pressure turbine portion drives a second electrical generating means. A first flow of superheat steam flows through the high-pressure portion, while a second flow of reheat steam flows through the intermediate and low-pressure portions in succession. Provision is made for bypassing steam around the turbine portions; in particular, one bypass means permits a flow of superheat steam from the steam source to the exhaust of the high-pressure portion, and another bypass means allows reheated steam to pass from the source to the exhaust of the low-pressure portion. The first and second steam flows are governed independently. While one of such flows is varied for purposes of controlling the rotational speed of the first generating means according to a desired speed, the other flow is varied to regulate a power plant variable at its desired level. (author)

  6. Steam generator tube support plate degradation in French plants: maintenance strategy

    International Nuclear Information System (INIS)

    Gauchet, J.-P.; Gillet, N.; Stindel, M.

    1998-01-01

    This paper reports on the degradations of Steam Generator (SG) Tube Support Plates (TSPs) observed in French plants and the maintenance strategy adopted to continue operating the plant without any decrease of the required safety level. Only drilled carbon steel TSPs of early SGs are affected. Except the particular damage of the TSP8 of FESSENHEIM 2 caused by chemical cleaning procedures implemented in 1992, two main problems were observed almost exclusively on the upper TSP: Ligaments ruptured near the aseismic block located at 215 degrees. This degradation is perfectly detectable by bobbin coil inspection. It occurs very early in the life of the SG as can be seen from the records of previous inspections and no evolution of the signals was observed. This damage can be detected for 51M model SGs on several sites; Wastage of the ligaments resulting in enlargement of flow holes with in some cases complete consumption of a ligament. This damage was only observed for SGs of at GRAVELINES. This damage evolved cycle after cycle. Detailed studies were performed to analyze tubing behavior when a tube is not supported by the upper TSP because of missing ligaments. These studies evaluated the risk of vibratory instability, the behavior of both the TSP and the tubing in case of a seismic event or a LOCA and finally the behavior of the TSP in case of a Steam Line Break. Concerning vibratory instability it was possible to define zones where stability could not be demonstrated. Dampine, cables and sentinel plugs were then used when necessary to eliminate the risk of Steam Generator Tube Rupture (SGTR). For accidental conditions, it could be shown that no unacceptable damage occurs and that the core cooling function of the SG is always maintained if some tubes are plugged. From this analysis, It was possible to define the inspection programs for the different plants taking into account the specific situation of each plant regarding the damages detected. These programs include

  7. Thermohidraulic model for a typical steam generator of PWR Nuclear Power Plants

    International Nuclear Information System (INIS)

    Braga, C.V.M.

    1980-06-01

    A model of thermohidraulic simulation, for steady state, considering the secondary flow divided in two parts individually homogeneous, and with heat and mass transferences between them is developed. The quality of the two-phase mixture that is fed to the turbine is fixed and, based on this value, the feedwater pressure is determined. The recirculation ratio is intrinsically determined. Based on this model it was developed the GEVAP code, in Fortran-IV language. The model is applied to the steam generator of the Angra II nuclear power plant and the results are compared with KWU'S design parameters, being considered satisfactory. (Author) [pt

  8. Shiraz solar power plant operation with steam engine

    International Nuclear Information System (INIS)

    Yaghoubi, M.; Azizian, K.

    2004-01-01

    The present industrial developments and daily growing need of energy, as well as economical and environmental problem caused by fossil fuels consumption, resulted certain constraint for the future demand of energy. During the past two decades great attention has been made to use renewable energy for different sectors. In this regard for the first time in Iran, design and construction of a 250 K W Solar power plant in Shiraz, Iran is being carried out and it will go to operation within next year. The important elements of this power plant is an oil cycle and a steam cycle, and several studies have been done about design and operation of this power plant, both for steady state and transient conditions. For the steam cycle, initially a steam turbine was chosen and due to certain limitation it has been replaced by a steam engine. The steam engine is able to produce electricity with hot or saturated vapor at different pressures and temperatures. In this article, the effects of installing a steam engine and changing its vapor inlet pressure and also the effects of sending hot or saturated vapor to generate electricity are studied. Various cycle performance and daily electricity production are determined. The effects of oil cycle temperature on the collector field efficiency, and daily, monthly and annual amount of electricity production is calculated. Results are compared with the steam cycle output when it contains a steam turbine. It is found that with a steam engine it is possible to produce more annual electricity for certain conditions

  9. Indian Point 2 steam generator tube rupture analyses

    International Nuclear Information System (INIS)

    Dayan, A.

    1985-01-01

    Analyses were conducted with RETRAN-02 to study consequences of steam generator tube rupture (SGTR) events. The Indian Point, Unit 2, power plant (IP2, PWR) was modeled as a two asymmetric loops, consisting of 27 volumes and 37 junctions. The break section was modeled once, conservatively, as a 150% flow area opening at the wall of the steam generator cold leg plenum, and once as a 200% double-ended tube break. Results revealed 60% overprediction of breakflow rates by the traditional conservative model. Two SGTR transients were studied, one with low-pressure reactor trip and one with an earlier reactor trip via over temperature ΔT. The former is more typical to a plant with low reactor average temperature such as IP2. Transient analyses for a single tube break event over 500 seconds indicated continued primary subcooling and no need for steam line pressure relief. In addition, SGTR transients with reactor trip while the pressurizer still contains water were found to favorably reduce depressurization rates. Comparison of the conservative results with independent LOFTRAN predictions showed good agreement

  10. Energy and exergy analysis of the Kalina cycle for use in concentrated solar power plants with direct steam generation

    DEFF Research Database (Denmark)

    Knudsen, Thomas; Clausen, Lasse Røngaard; Haglind, Fredrik

    2014-01-01

    In concentrated solar power plants using direct steam generation, the usage of a thermal storage unit based only on sensible heat may lead to large exergetic losses during charging and discharging, due to a poor matching of the temperature profiles. By the use of the Kalina cycle, in which...... evaporation and condensation takes place over a temperature range, the efficiency of the heat exchange processes can be improved, possibly resulting also in improved overall performance of the system. This paper is aimed at evaluating the prospect of using the Kalina cycle for concentrated solar power plants...... with direct steam generation. The following two scenarios were addressed using energy and exergy analysis: generating power using heat from only the receiver and using only stored heat. For each of these scenarios comparisons were made for mixture concentrations ranging from 0.1 mole fraction of ammonia to 0...

  11. Primary separator replacement for Bruce Unit 8 steam generators

    International Nuclear Information System (INIS)

    Roy, S.B.; Mewdell, C.G.; Schneider, W.G.

    2000-01-01

    During a scheduled maintenance outage of Bruce Unit 8 in 1998, it was discovered that the majority of the original primary steam separators were damaged in two steam generators. The Bruce B steam generators are equipped with GXP type primary cyclone separators of B and W supply. There were localized perforations in the upper part of the separators and large areas of generalized wall thinning. The degradation was indicative of a flow related erosion corrosion mechanism. Although the unit- restart was justified, it was obvious that corrective actions would be necessary because of the number of separators affected and the extent of the degradation. Repair was not considered to be a practical option and it was decided to replace the separators, as required, in Unit 8 steam generators during an advanced scheduled outage. GXP separators were selected for replacement to minimize the impact on steam generator operating characteristics and analysis. The material of construction was upgraded from the original carbon steel to stainless steel to maximize the assurance of full life. The replacement of the separators was a first of a kind operation not only for Ontario Power Generation and B and W but also for all CANDU plants. The paper describes the degradations observed and the assessments, the operating experience, manufacture and installation of the replacement separators. During routine inspection in 1998, many of the primary steam separators in two of steam generators at Bruce Nuclear Division B Unit 8 were observed to have through wall perforations. This paper describes assessment of this condition. It also discusses the manufacture and testing of replacement primary steam separators and the development and execution of the replacement separator installation program. (author)

  12. Completion of a simulation model for calculation of static and dynamic behaviour of steam generators and its use for a pilot steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Seybold, M

    1979-07-20

    In the present paper, first of all the model concept reported in detail by Schittke is applied to the steady-state predictive calculation of an arbitrarily nested steam generator based on the design data and empirical values on heat discharge and heat transfer. The dynamics of the system are precalculated on the basis of the known steady-state behaviour and with the construction data, that is without experimental identification, according to the Schittke concept. The object for the calculation is a steam generator with once-through forced flow (VDE) which was put at the disposal of the Institute for Process Engineering and Steamboiler Studies. Data for the computer programs were taken only from the construction documents (geometries, nesting etc.) or from design data (thermic parameters). Parallel with the program preparation and the calculation measurements on the experimental plant were planned, adaptations and tests were carried out. The correctness of precalculating a steam generator could then be checked with the experimental plant and by comparison with the results of the measurements.

  13. Mathematical modeling of a steam generator for sensor fault detection

    International Nuclear Information System (INIS)

    Prock, J.

    1988-01-01

    A dynamic model for a nuclear power plant steam generator (vertical, preheated, U-tube recirculation-type) is formulated as a sixth-order nonlinear system. The model integrates nodal mass and energy balances for the primary water, the U-tube metal and the secondary water and steam. The downcomer flow is determined by a static balance of momentum. The mathematical system is solved using transient input data from the Philippsburg 2 (FRG) nuclear power plant. The results of the calculation are compared with actual measured values. The proposed model provides a low-cost tool for the automatic control and simulation of the steam generating process. The ''parity-space'' algorithm is used to demonstrate the applicability of the mathematical model for sensor fault detection and identification purposes. This technique provides a powerful means of generating temporal analytical redundancy between sensor signals. It demonstrates good detection rates of sensor errors using relatively few steps of scanning time and allows the reconfiguration of faulty signals. (author)

  14. Application of an eddy current technique to steam generator U-bend characterization. Final report

    International Nuclear Information System (INIS)

    Cramer, W.E.; de la Pintiere, L.; Narita, S.; Bergander, M.J.

    1982-04-01

    Eddy current nondestructive testing techniques are used widely throughout the utility industry for the early detection of tube damage in critical power plant components such as steam generators. In this project, the application of an eddy current technique for the characterization of U-bend transitions in the first row tubing in Westinghouse 51 Series Steam Generators has been investigated. A method has been developed for detection of the opposite transition in the U-bend and for defining its severity. Investigation included two different types of U-bend transitions. Using the developed eddy current method for U-bend characterization, on-site inspection was performed on all tubes in the first row in four 51 Series steam generators in Power Plant Unit No. 2 and in one 51 Series steam generator in Power Plant Unit No. 1. The advantages and limitations of the developed method as well as the recommendations for further investigations are included

  15. A State-of-the-Art Report on Technologies of Volume Reduction and Self-Disposal for Large Metal Wastes including the Steam Generator of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Kune Woo; Choi, W. K.; Kim, G. Y.

    2009-06-01

    This report focuses on technologies of volume reduction and self-disposal for large metal wastes including the steam generator of nuclear power plants. This report consists of the cases of treatments and foreign and domestic technologies for steam generator replacement

  16. Methods of increasing thermal efficiency of steam and gas turbine plants

    Science.gov (United States)

    Vasserman, A. A.; Shutenko, M. A.

    2017-11-01

    Three new methods of increasing efficiency of turbine power plants are described. Increasing average temperature of heat supply in steam turbine plant by mixing steam after overheaters with products of combustion of natural gas in the oxygen. Development of this idea consists in maintaining steam temperature on the major part of expansion in the turbine at level, close to initial temperature. Increasing efficiency of gas turbine plant by way of regenerative heating of the air by gas after its expansion in high pressure turbine and before expansion in the low pressure turbine. Due to this temperature of air, entering combustion chamber, is increased and average temperature of heat supply is consequently increased. At the same time average temperature of heat removal is decreased. Increasing efficiency of combined cycle power plant by avoiding of heat transfer from gas to wet steam and transferring heat from gas to water and superheated steam only. Steam will be generated by multi stage throttling of the water from supercritical pressure and temperature close to critical, to the pressure slightly higher than condensation pressure. Throttling of the water and separation of the wet steam on saturated water and steam does not require complicated technical devices.

  17. Steam generator water lancing

    International Nuclear Information System (INIS)

    Kamler, F.; Schneider, W.

    1992-01-01

    The tubesheet and tube support plate deposits in CANDU steam generators are notable for their hardness. Also notable is the wide variety of steam generator access situations. Because of the sludge hardness and the difficulty of the access, traditional water lancing processes which directed jets from the central tube free lane or from the periphery of the bundle have proven unsuitable. This has led to the need for some very unique inter tube water lancing devices which could direct powerful water jets directly onto the deposits. This type of process was applied to the upper broached plates of the Bruce A steam generators, which had become severely blocked. It has since been applied to various other steam generator situations. This paper describes the flexlance equipment development, qualification, and performance in the various CANDU applications. 4 refs., 2 tabs., 7 figs

  18. Replacement of steam generators at arkansas nuclear one, unit-2 (ano-2)

    International Nuclear Information System (INIS)

    Wilson, R.M.; Buford, A.

    2001-01-01

    The Arkansas Nuclear One, Unit-2 steam generators, originally supplied by Combustion Engineering, began commercial operation in 1980 producing a gross electrical output of 958 MW. After several years of successful operation, the owner decided that the tube degradation rates of the original steam generators were too high for the plant to meet the performance requirements for the full 40-year license period. The contract to supply replacement steam generators (RSGs) was awarded to Westinghouse Electric Company in 1996. Installation of these RSGs took place in the last months of 2000. This paper compares the design features of the original and re-placement steam generators with emphasis on design and reliability enhancements achieved. (author)

  19. Steam generator tube integrity program

    International Nuclear Information System (INIS)

    Dierks, D.R.; Shack, W.J.; Muscara, J.

    1996-01-01

    A new research program on steam generator tubing degradation is being sponsored by the U.S. Nuclear Regulatory Commission (NRC) at Argonne National Laboratory. This program is intended to support a performance-based steam generator tube integrity rule. Critical areas addressed by the program include evaluation of the processes used for the in-service inspection of steam generator tubes and recommendations for improving the reliability and accuracy of inspections; validation and improvement of correlations for evaluating integrity and leakage of degraded steam generator tubes, and validation and improvement of correlations and models for predicting degradation in steam generator tubes as aging occurs. The studies will focus on mill-annealed Alloy 600 tubing, however, tests will also be performed on replacement materials such as thermally-treated Alloy 600 or 690. An overview of the technical work planned for the program is given

  20. Steam generator tube extraction

    International Nuclear Information System (INIS)

    Delorme, H.

    1985-05-01

    To enable tube examination on steam generators in service, Framatome has now developed a process for removing sections of steam generator tubes. Tube sections can be removed without being damaged for treating the tube section expanded in the tube sheet

  1. Operating experience of steam generator test facility

    International Nuclear Information System (INIS)

    Sureshkumar, V.A.; Madhusoodhanan, G.; Noushad, I.B.; Ellappan, T.R.; Nashine, B.K.; Sylvia, J.I.; Rajan, K.K.; Kalyanasundaram, P.; Vaidyanathan, G.

    2006-01-01

    Steam Generator (SG) is the vital component of a Fast Reactor. It houses both water at high pressure and sodium at low pressure separated by a tube wall. Any damage to this barrier initiates sodium water reaction that could badly affect the plant availability. Steam Generator Test Facility (SGTF) has been set up in Indira Gandhi Centre for Atomic Research (IGCAR) to test sodium heated once through steam generator of 19 tubes similar to the PFBR SG dimension and operating conditions. The facility is also planned as a test bed to assess improved designs of the auxiliary equipments used in Fast Breeder Reactors (FBR). The maximum power of the facility is 5.7 MWt. This rating is arrived at based on techno economic consideration. This paper covers the performance of various equipments in the system such as Electro magnetic pumps, Centrifugal sodium pump, in-sodium hydrogen meters, immersion heaters, and instrumentation and control systems. Experience in the system operation, minor modifications, overall safety performance, and highlights of the experiments carried out etc. are also brought out. (author)

  2. Cheaper power generation from surplus steam generating capacities

    International Nuclear Information System (INIS)

    Gupta, K.

    1996-01-01

    Prior to independence most industries had their own captive power generation. Steam was generated in own medium/low pressure boilers and passed through extraction condensing turbines for power generation. Extraction steam was used for process. With cheaper power made available in Nehru era by undertaking large hydro power schemes, captive power generation in industries was almost abandoned except in sugar and large paper factories, which were high consumers of steam. (author)

  3. Assessment and Management of Ageing of Major Nuclear Power Plant Components Important to Safety: Steam Generators. 2011 Update

    International Nuclear Information System (INIS)

    2011-11-01

    generator of the PWR, WWER and CANDU nuclear power plants. The objective of this report is to update and supersede IAEA-TECDOC-981 in order to provide current ageing management guidance for PWR, WWER and CANDU steam generators to all involved in the operation and regulation of nuclear power plants and thus to help ensure steam generator integrity in IAEA Member States throughout their entire service life.

  4. Effect of tube plugging in the thermalhydraulic performance of 'U' tube steam generators

    International Nuclear Information System (INIS)

    Braga, C.V.M.; Carajilescov, P.

    1981-05-01

    The thermalhydraulic performance of Angra II steam generator has been simulated using the model developed by Braga, C.V.M., 'Thermohydraulic model for steam generator of PWR power plants', in steady state, with plugging up to 40% of total number of tubes. (E.G.) [pt

  5. Particle Swarm Optimization to the U-tube steam generator in the nuclear power plant

    International Nuclear Information System (INIS)

    Ibrahim, Wesam Zakaria

    2014-01-01

    Highlights: • We establish stability mathematical model of steam generator and reactor core. • We propose a new Particle Swarm Optimization algorithm. • The algorithm can overcome premature phenomenon and has a high search precision. • Optimal weight of steam generator is 15.1% less than the original. • Sensitivity analysis and optimal design provide reference for steam generator design. - Abstract: This paper, proposed an improved Particle Swarm Optimization approach for optimize a U-tube steam generator mathematical model. The UTSG is one of the most important component related to safety of most of the pressurized water reactor. The purpose of this article is to present an approach to optimization in which every target is considered as a separate objective to be optimized. Multi-objective optimization is a powerful tool for resolving conflicting objectives in engineering design and numerous other fields. One approach to solve multi-objective optimization problems is the non-dominated sorting Particle Swarm Optimization. PSO was applied in regarding the choice of the time intervals for the periodic testing of the model of the steam generator

  6. Particle Swarm Optimization to the U-tube steam generator in the nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ibrahim, Wesam Zakaria, E-mail: mimi9_m@yahoo.com

    2014-12-15

    Highlights: • We establish stability mathematical model of steam generator and reactor core. • We propose a new Particle Swarm Optimization algorithm. • The algorithm can overcome premature phenomenon and has a high search precision. • Optimal weight of steam generator is 15.1% less than the original. • Sensitivity analysis and optimal design provide reference for steam generator design. - Abstract: This paper, proposed an improved Particle Swarm Optimization approach for optimize a U-tube steam generator mathematical model. The UTSG is one of the most important component related to safety of most of the pressurized water reactor. The purpose of this article is to present an approach to optimization in which every target is considered as a separate objective to be optimized. Multi-objective optimization is a powerful tool for resolving conflicting objectives in engineering design and numerous other fields. One approach to solve multi-objective optimization problems is the non-dominated sorting Particle Swarm Optimization. PSO was applied in regarding the choice of the time intervals for the periodic testing of the model of the steam generator.

  7. Energetic and exergetic analysis of a steam turbine power plant in an existing phosphoric acid factory

    International Nuclear Information System (INIS)

    Hafdhi, Fathia; Khir, Tahar; Ben Yahyia, Ali; Ben Brahim, Ammar

    2015-01-01

    Highlights: • The operating mode of the factory and the power supply streams are presented. • Energetic Analysis of steam turbine power plant of an existing phosphoric acid factory. • Exergetic Analysis of each component of steam turbine power plant and the different heat recovery system. • Energy, exergy efficiency and irreversibility rates for the main components are determined. • The effect of the operating parameters on the plant performance are analyzed. - Abstract: An energetic and exergetic analysis is conducted on a Steam Turbine Power Plant of an existing Phosphoric Acid Factory. The heat recovery systems used in the different parts of the plant are also considered in the study. Mass, energy and exergy balances are established on the main compounds of the plant. A numerical code is established using EES software to perform the calculations required for the thermal and exergy plant analysis considering real variation ranges of the main operating parameters such as pressure, temperature and mass flow rate. The effects of theses parameters on the system performances are investigated. The main sources of irreversibility are the melters, followed by the heat exchangers, the steam turbine generator and the pumps. The maximum energy efficiency is obtained for the blower followed by the heat exchangers, the deaerator and the steam turbine generator. The exergy efficiency obtained for the heat exchanger, the steam turbine generator, the deaerator and the blower are 88%, 74%, 72% and 66% respectively. The effects of High Pressure steam temperature and pressure on the steam turbine generator energy and exergy efficiencies are investigated.

  8. Recent operating experiences with steam generators in Japanese NPPs

    International Nuclear Information System (INIS)

    Yashima, Seiji

    1997-01-01

    In 1994, the Genkai-3 of Kyushu Electric Power Co., Inc. and the Ikata-3 of Shikoku Electric Power Co., Inc. started commercial operation, and now 22 PWR plants are being operated in Japan. Since the first PWR plant now 22 PWR plants are being operated in was started to operate, Japanese PWR plants have had an operating experience of approx. 280 reactor-years. During that period, many tube degradations have been experienced in steam generators (SGs). And, in 1991, the steam generator tube rupture (SGTR) occurred in the Mihama-2 of Kansai Electric Power Co., Inc. However, the occurrence of tube degradation of SGs has been decreased by the instructions of the MITI as regulatory authorities, efforts of Electric Utilities, and technical support from the SG manufacturers. Here the author describes the recent SGs in Japan about the following points. (1) Recent Operating Experiences (2) Lessons learned from Mihama-2 SGTR (3) SG replacement (4) Safety Regulations on SG (5) Research and development on SG

  9. Optimization of the steam generator project of a gas cooled nuclear reactor

    International Nuclear Information System (INIS)

    Sakai, Massao

    1978-01-01

    The present work is concerned with the modeling of the primary and secondary circuits of a gas cooled nuclear reactor in order to obtain the relation between the parameters of the two cycles and the steam generator performance. The procedure allows the optimization of the steam generator, through the maximization of the plant net power, and the application of the optimal control theory of dynamic systems. The heat balances for the primary and secondary circuits are carried out simultaneously with the optimized - design parameters of the steam generator, obtained using an iterative technique. (author)

  10. Experience of research, design, capacity, and operation with forced flow steam generators

    International Nuclear Information System (INIS)

    Bertolotti, G.; McDonald, B.N.; Pocock, F.J.

    1975-01-01

    The forced flow steam generators in operation in six American nuclear power plants show an excellent operational behaviour. The concept for this type of steam generator has been developed in the USA, and it has been successfully tested over several years regarding its suitability for PWRs of a larger size. The results concerning construction, materials and water chemistry for this steam generator, which will be used for the first time in the FRG in the nuclear power station Muelheim-Kaerlich, have confirmed the high reliability of this high-efficiency component. (orig./LN) [de

  11. Steam-generator replacement sets new marks

    International Nuclear Information System (INIS)

    Beck, R.L.

    1995-01-01

    This article describes how, in one of the most successful steam-generator replacement experiences at PWRs worldwide, the V C Summer retrofit exceeded plant goals for critical-path duration, radiation, exposure, and radwaste generation. Intensive planning and teamwork, combined with the firm support of station management and the use of mockups to prepare the work crews for activity in a radiological environment, were key factors in the record performance achieved by South Carolina Electric and Gas Co (SCE and G) in replacing three steam generators at V C Summer nuclear station. The 97-day, two-hour breaker-to-breaker replacement outage -- including an eight-day delay for repair of leak in a small-bore seal-injection line of a reactor coolant pump (unrelated to the replacement activities) -- surpassed the project goal by over one day. Moreover, the outage was only 13 hours shy of the world record held by Virginia Power Co's North Anna Unit 1

  12. Some possible causes and probability of leakages in LMFBR steam generators

    International Nuclear Information System (INIS)

    Bolt, P.R.

    1984-01-01

    Relevant operational experience with steam generators for process and conventional plant and thermal and fast reactors is reviewed. Possible causes of water/steam leakages into sodium/gas are identified and data is given on the conditions necessary for failure, leakage probability and type of leakage path. (author)

  13. PWR steam generator chemical cleaning. Phase I: Final report, Volume I

    International Nuclear Information System (INIS)

    1978-07-01

    Two chemical cleaning solvent systems and two application methods were developed to remove the sludge in nuclear steam generators and to remove the corrosion products in the annuli between the steam generator tubes and the support plates. Laboratory testing plus subsequent pilot testing has demonstrated that, in a reasonable length of time, both solvents are capable of dissolving significant amounts of sludge, and of dissolving tightly packed magnetite in tube/support plate crevices. Further, tests have demonstrated that surface losses of the materials of construction in steam generators can be controlled to acceptable limits for the duration of the required cleaning period. Areas requiring further study and test have been identified, and a preliminary procedure for chemical cleaning nuclear steam generators has been chosen subject to quantification based on additional tests prior to actual in-plant demonstration

  14. Diagnostic system of steam generator, especially molten metal heated steam generator

    International Nuclear Information System (INIS)

    Matal, O.; Martoch, J.

    1986-01-01

    A diagnostic system is described and graphically represented consisting of a leak detector, a medium analyzer and sensors placed on the piping connected to the indication sections of both tube plates. The advantage of the designed system consists in the possibility of detecting tube failure immediately on leak formation, especially in generators with duplex tubes. This shortens the period of steam generator shutdown for repair and reduces power losses. The design also allows to make periodical leak tests during planned steam generator shutdowns. (A.K.)

  15. Steam generator with perfected dryers

    International Nuclear Information System (INIS)

    Fenet, J.C.

    1987-01-01

    This steam generator has vertically superposed array of steam dryers. These dryers return the steam flow of 180 0 . The return of the water is made by draining channels to the steam production zone [fr

  16. Steam generator reliability improvement project

    International Nuclear Information System (INIS)

    Blomgren, J.C.; Green, S.J.

    1987-01-01

    Upon successful completion of its research and development technology transfer program, the Electric Power Research Institute's Steam Generator Owners Group (SGOG II) will disband in December 1986 and be replaced in January 1987 by a successor project, the Steam Generator Reliability Project (SGRP). The new project, funded in the EPRI base program, will continue the emphasis on reliability and life extension that was carried forward by SGOG II. The objectives of SGOG II have been met. Causes and remedies have been identified for tubing corrosion problems, such as stress corrosion cracking and pitting, and steam generator technology has been improved in areas such as tube wear prediction and nondestructive evaluation (NDE). These actions have led to improved reliability of steam generators. Now the owners want to continue with a centrally managed program that builds on what has been learned. The goal is to continue to improve steam generator reliability and solve small problems before they become large problems

  17. Steam generator reliability improvement project

    International Nuclear Information System (INIS)

    Blomgren, J.C.; Green, S.J.

    1987-01-01

    Upon successful completion of its research and development technology transfer program, the Electric Power Research Institute's (EPRI's) Steam Generator Owners Group (SGOG II) will disband in December 1986, and be replaced in January 1987, by a successor project, the Steam Generator Reliability Project (SGRP). The new project, funded in the EPRI base program, will continue to emphasize reliability and life extension, which were carried forward by SGOG II. The objectives of SGOG II have been met. Causes and remedies have been identified for tubing corrosion problems such as stress corrosion cracking and pitting, and steam generator technology has been improved in areas such as tube wear prediction and nondestructive evaluation. These actions have led to improved reliability of steam generators. Now the owners want to continue with a centrally managed program that builds on what has been learned. The goal is to continue to improve steam generator reliability and to solve small problems before they become large problems

  18. Wasteless combined aggregate-coal-fired steam-generator/melting-converter

    International Nuclear Information System (INIS)

    Pioro, L.S.; Pioro, I.L.

    2003-01-01

    A method of reprocessing coal sludge and ash into granulate for the building industry in a combined wasteless aggregate-steam-generator/melting-converter was developed and tested. The method involves melting sludge and ash from coal-fired steam-generators of power plants in a melting-converter installed under the steam-generator, with direct sludge drain from the steam generator combustion chamber. The direct drain of sludge into converter allows burnup of coal with high ash levels in the steam-generator without an additional source of ignition (natural gas, heating oil, etc.). Specific to the melting process is the use of a gas-air mixture with direct combustion inside a melt. This feature provides melt bubbling and helps to achieve maximum heat transfer from combustion products to the melt, to improve mixing, to increase rate of chemical reactions and to improve the conditions for burning the carbon residue from the sludge and ash. The 'gross' thermal efficiency of the combined aggregate is about 93% and the converter capacity is about 18 t of melt in 100 min. The experimental data for different aspects of the proposed method are presented. The effective ash/charging materials feeding system is also discussed. The reprocessed coal ash and sludge in the form of granules can be used as fillers for concretes and as additives in the production of cement, bricks and other building materials

  19. Steam generator replacement from ALARA aspects

    International Nuclear Information System (INIS)

    Terry, I.; Breznik, B.

    2003-01-01

    This paper is going to consider radiological related parameters important for steam generator replacement (SGR) implementation. These parameters are identified as ALARA related parameters, owner-contractor relationship, planning, health physics with logistic services, and time required for the replacement. ALARA related parameters such as source or initial dose rate and plant system configuration define the initial conditions for the planning. There is room to optimise work planning. managerial procedures and also the staff during the implementation phase. The overview of these general considerations is based on the following background: using internationally available data and the experience of one of the vendors, i.e. Siemens-Framatome, and management experience of SG replacement which took place at Krsko NPP in the spring of 2000. Generally plant decisions on maintenance or repair procedures under radiation conditions take into account ALARA considerations. But in the main it is difficult to adjudge the results of an ALARA study, usually in the form of a collective dose estimate, because a comparison standard is missing. That is, very often the planned work is of a one-off nature so comparisons are not possible or the scopes are not the same. In such a case the collective doses for other types of work are looked at and a qualitative evaluation is made. In the case of steam generator replacement this is not the case. Over years of steam generator replacements world-wide a standard has been developed gradually. The first part of the following displays an overview of SGR and sets the Krsko SGR in perspective by applying dose analysis. The second part concentrates on the Krsko SGR itself and its ALARA aspects. (authors)

  20. 49 CFR 229.105 - Steam generator number.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Steam generator number. 229.105 Section 229.105..., DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Steam Generators § 229.105 Steam generator number. An identification number shall be marked on the steam generator's...

  1. Steam-generator-tube-rupture transients for pressurized-water reactors

    International Nuclear Information System (INIS)

    Dobranich, D.; Henninger, R.J.; DeMuth, N.S.

    1982-01-01

    Steam generator tube ruptures with and without concurrent main-steam-line break are investigated for pressurized water reactors supplied by the major US vendors. The goal of these analyses is to provide thermodynamic and flow conditions for the determination of iodine transport to the environment and to provide an evaluation of the adequacy of the plant safety systems and operating procedures for controlling these transients. The automatic safety systems of the plant were found to be adequate for the mitigation of these transients. Emergency injection system flows equilibrated with the leakage flows and prevented core uncovery. Sufficient time was afforded by the plant safety systems for the operators to identify the problem and to take appropriate measures

  2. Effect of liquid waste discharges from steam generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    McGuire, H.E. Jr.

    1977-09-01

    This report contains a summary of the effects of liquid waste discharges from steam electric generating facilities on the environment. Also included is a simplified model for use in approximately determining the effects of these discharges. Four basic fuels are used in steam electric power plants: three fossil fuels--coal, natural gas, and oil; and uranium--presently the basic fuel of nuclear power. Coal and uranium are expected to be the major fuels in future years. The following power plant effluents are considered: heat, chlorine, copper, total dissolved solids, suspended solids, pH, oil and grease, iron, zinc, chrome, phosphorus, and trace radionuclides.

  3. Effect of liquid waste discharges from steam generating facilities

    International Nuclear Information System (INIS)

    McGuire, H.E. Jr.

    1977-09-01

    This report contains a summary of the effects of liquid waste discharges from steam electric generating facilities on the environment. Also included is a simplified model for use in approximately determining the effects of these discharges. Four basic fuels are used in steam electric power plants: three fossil fuels--coal, natural gas, and oil; and uranium--presently the basic fuel of nuclear power. Coal and uranium are expected to be the major fuels in future years. The following power plant effluents are considered: heat, chlorine, copper, total dissolved solids, suspended solids, pH, oil and grease, iron, zinc, chrome, phosphorus, and trace radionuclides

  4. Corrosion Product Measurements to ensure integrity of the Steam Generators in Beznau NPP

    International Nuclear Information System (INIS)

    Mailand, Irene; Franz, Patrick; Venz, Hartmut

    2012-09-01

    The Nuclear Power Plant Beznau comprises two identical 380 MWe PWR units with two loops each, commissioned in 1969 and 1971. Westinghouse was responsible for the primary part of the plant and BBC/ABB for the secondary circuit. The original materials used in the secondary systems were made of several copper-based alloys, such as for the Condensers, the Low Pressure Pre-heaters and the Moisture Separator Re-heater. The original Steam Generator Tubes were made of Inconel 600 MA. Regarding its age, the NPP Beznau has to be qualified as an old plant. However, in fact particularly in the last 20 years the plant has undergone an extensive modernisation programme in which about 1.5 billion Swiss Francs have been invested. Important measures were the replacements of the Steam Generators with tubes comprising Inconel 690 TT which was realized at unit 1 in 1993 and at unit 2 in 1999. Copper was completely banished from the secondary system and replaced by stainless and chromium steel. The Condensers were fitted with titanium tubes. The secondary water chemistry had to be changed by these replacements and moved step by step from Low-AVT with a pH of about 9.3 to High-AVT with a pH of 9.8 to 9.9, currently. To ensure the integrity of the new Steam Generators as well as of the whole Secondary System a corrosion product programme was introduced at the end of the Nineties. Several investigations which are performed periodically are represented by analyses of corrosion products, measurements of sludge mass and composition in the Steam Generators, Hide-Out-Return- and mass balance measurements of corrosion products in the whole circuit. Objectives of these investigations are assessments of the efficiency of the water chemistry and trend considerations regarding to the transport of corrosion products and pollutants into the Steam Generator, as well as of the potential danger of deposits and stored or absorbed pollutants. The main target of all measures is to avoid any chemical

  5. GRUVAL for ET inspection of the steam generator tubes

    International Nuclear Information System (INIS)

    Garcia Bueno, A.; Francia, L.; Jimenez Garcia, J. J.; Garcia, R.; Castelinou, M.; Torrens, J.

    2013-01-01

    The steam generators of the nuclear power plants, PWR type are one of the most important components from the point of view of safety and plant availability. Thousands of tubes that form, approximately 1 mm of thickness, required to be inspected in accordance with codes and standards, to ensure the integrity of the component during the operation of the plant.

  6. Solar energy for steam generation in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    De Carvalho, Jr, A V; Orlando, A DeF; Magnoli, D

    1979-05-01

    Steam generation is a solar energy application that has not been frequently studied in Brazil, even though for example, about 10% of the national primary energy demand is utilized for processing heat generation in the range of 100 to 125/sup 0/C. On the other hand, substitution of automotive gasoline by ethanol, for instance, has received much greater attention even though primary energy demand for process heat generation in the range of 100 to 125/sup 0/C is of the same order of magnitude than for total automotive gasoline production. Generation of low-temperature steam is analyzed in this article using distributed systems of solar collectors. Main results of daily performance simulation of single flat-plate collectors and concentrating collectors are presented for 20/sup 0/S latitude, equinox, in clear days. Flat plate collectors considered are of the aluminum roll-bond absorber type, selective surface single or double glazing. Considering feedwater at 20/sup 0/C, saturated steam at 120/sup 0/C and an annual solar utilization factor of 50%, a total collector area of about 3,000 m/sup 2/ is necessary for the 10 ton/day plant, without energy storage. A fuel-oil back-up system is employed to complement the solar steam production, when necessary. Preliminary economic evaluation indicates that, although the case-study shows today a long payback period relative to subsidized fuel oil in the domestic market (over 20 years in the city of Rio de Janeiro), solar steam systems may be feasible in the medium term due to projected increase of fuel oil price in Brazil.

  7. Steam turbines for nuclear power plants

    International Nuclear Information System (INIS)

    Kosyak, Yu.F.

    1978-01-01

    Considered are the peculiarities of the design and operation of steam turbines, condensers and supplementary equipment of steam turbines for nuclear power plants; described are the processes of steam flow in humid-steam turbines, calculation and selection principles of main parameters of heat lines. Designs of the turbines installed at the Charkov turbine plant are described in detail as well as of those developed by leading foreign turbobuilding firms

  8. Modeling of steam generator in nuclear power plant using neural network ensemble

    International Nuclear Information System (INIS)

    Lee, S. K.; Lee, E. C.; Jang, J. W.

    2003-01-01

    Neural network is now being used in modeling the steam generator is known to be difficult due to the reverse dynamics. However, Neural network is prone to the problem of overfitting. This paper investigates the use of neural network combining methods to model steam generator water level and compares with single neural network. The results show that neural network ensemble is effective tool which can offer improved generalization, lower dependence of the training set and reduced training time

  9. Evaluation of hideout return data from U.S. PWR steam generators

    International Nuclear Information System (INIS)

    Connor, W.M.; Richards, J.E.

    1988-01-01

    Since the middle to late 1970's, dramatic reductions in the quantities of impurities in the bulkwater of PWR steam generators have been made by U.S. utilities. Today most utilities operate at full power with impurity concentrations in the steam generator blowdown in the low ppb range, well within existing industry guideline control limits. Despite these efforts, some of these same utilities have subsequently encountered secondary side stress corrosion cracking (SCC) and intergranular attack (IGA) of steam generator tubing within deep tubesheet crevices and more recently at tube support intersections. It must, therefore, be concluded that either continuous low level input of contaminants within existing guideline limits, or intermittent short duration input, undetected by either current sampling and analysis techniques or procedures, are permitting ingress of corrosive impurity species which subsequently concentrate in flow-occluded regions to produce localized tube corrosion. To better understand both the quantity and composition of accumulated impurity species, more and more utilities, even those who have not experienced any steam generator corrosion, have begun to perform rigorous sampling and analysis evaluations of returning chemical contaminants each time the units are brought off-line. This paper will show examples of how these data are being used by U.S. industry to gain valuable information about accumulated contaminant inventories, to make cycle-to-cycle and plant-to-plant comparisons, and to develop plant specific actions to promote maximum contaminant removal. (author)

  10. Detection and localisation of leaks in steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Westenbrugge, J.K. van; Visbach, D M [B.V. NERATOM, The Hague (Netherlands)

    1978-10-01

    Steam generator experience in Netherlands is concentrated in NERATOM, the company that takes part n the construction of LMFBRs: SNR-300 in Kalkar in the framework of the international company INB (Internationale Natrium Brutreaktor Bau) together with the German company INTERATOM and the Belgian company BelgoNucleaire. Experience consists of designing constructing and testing of prototypes of the SNR-300 plant components, constructing and licensing of the components for SNR-300 proper and in conceptual design of components for larger power plants. Supporting research and testing of the prototypes is carried out by the organization for Industrial Research TNO. The two types studied are the straight tube type and the helical tube type steam generator. Descriptions of both types were published earlier. It should be pointed out here that the construction material is the ferritic 2% Cr 1 Mo 1NiNb-steel (DIN Wnr. 1.6770)

  11. Ultrasonic downcomer flow measurements for recirculating steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Janzen, Victor, E-mail: Victor.Janzen@cnl.ca [Canadian Nuclear Laboratories, Chalk River, ON, Canada K0 J 1J0 (Canada); Luloff, Brian [Canadian Nuclear Laboratories, Chalk River, ON, Canada K0 J 1J0 (Canada); Sedman, Ken [Nuclear Safety Analysis & Support Department, Bruce Power, Toronto, ON, Canada M5G 1X6 (Canada)

    2015-08-15

    Highlights: • Measuring recirculating flow in nuclear steam generators provides useful information. • Flow measurements shed light on component performance and degradation mechanisms. • Commonly used ultrasonic technology and application methods are described. • Results of measurements at several power reactors are summarized. • Potential improvements in reliability and flexibility of application are suggested. - Abstract: Measurements of downcomer flow in nuclear steam generators can provide unique fitness for service and performance indicators related to overall thermalhydraulic performance, safety related secondary-side setpoints and certain forms of degradation. This paper reviews the benefits of downcomer-flow measurements to nuclear power–plant operators, and describes methods that are commonly used. It summarizes the history and state-of-the-art of the most widely used technology, non-intrusive ultrasonic systems, including field applications at several nuclear power plants. It also describes the technical challenges that remain, and summarizes recent technical developments and future improvements.

  12. Simulating Porous Magnetite Layer Deposited on Alloy 690TT Steam Generator Tubes.

    Science.gov (United States)

    Jeon, Soon-Hyeok; Son, Yeong-Ho; Choi, Won-Ik; Song, Geun Dong; Hur, Do Haeng

    2018-01-02

    In nuclear power plants, the main corrosion product that is deposited on the outside of steam generator tubes is porous magnetite. The objective of this study was to simulate porous magnetite that is deposited on thermally treated (TT) Alloy 690 steam generator tubes. A magnetite layer was electrodeposited on an Alloy 690TT substrate in an Fe(III)-triethanolamine solution. After electrodeposition, the dense magnetite layer was immersed to simulate porous magnetite deposits in alkaline solution for 50 days at room temperature. The dense morphology of the magnetite layer was changed to a porous structure by reductive dissolution reaction. The simulated porous magnetite layer was compared with flakes of steam generator tubes, which were collected from the secondary water system of a real nuclear power plant during sludge lancing. Possible nuclear research applications using simulated porous magnetite specimens are also proposed.

  13. SO2 pollution of heavy oil-fired steam power plants in Iran

    International Nuclear Information System (INIS)

    Nazari, S.; Shahhoseini, O.; Sohrabi-Kashani, A.; Davari, S.; Sahabi, H.; Rezaeian, A.

    2012-01-01

    Steam power plants using heavy oil provided about 17.4%, equivalent to 35.49 TWh, of electricity in Iran in 2007. However, having 1.55–3.5 weight percentage of sulfur, heavy oil produces SO 2 pollutant. Utilization of Flue Gas Desulfurization systems (FGD) in Iran's steam power plants is not common and thereby, this pollutant is dispersed in the atmosphere easily. In 2007, the average emission factor of SO 2 pollutant for steam power plants was 15.27 g/kWh, which means regarding the amount of electricity generated by steam power plants using heavy oil, 541,000 Mg of this pollutant was produced. In this study, mass distribution of SO 2 in terms of Mg/yr is considered and dispersion of this pollutant in each of the 16 steam power plants under study is modeled using Atmospheric Dispersion Modeling System (ADMS). Details of this study are demonstrated using Geographical Information System (GIS) software, ArcGIS. Finally, the average emission factor of SO 2 and the emission of it in Iran's steam power plants as well as SO 2 emission reduction programs of this country are compared with their alternatives in Turkey and China.

  14. Steam generator design requirements for ACR-1000

    International Nuclear Information System (INIS)

    Subash, S.; Hau, K.

    2006-01-01

    Atomic Energy of Canada Limited (AECL) has developed the ACR-1000 (Advanced CANDU Reactor-1000 ) to meet market expectations for enhanced safety of plant operation, high capacity factor, low operating cost, increased operating life, simple component replacement, reduced capital cost, and shorter construction schedule. The ACR-1000 design is based on the use of horizontal fuel channels surrounded by a heavy water moderator, the same feature as in all CANDU reactors. The major innovation in the ACR-1000 is the use of low enriched uranium fuel, and light water as the coolant, which circulates in the fuel channels. This results in a compact reactor core design and a reduction of heavy water inventory, both contributing to a significant decrease in capital cost per MWe produced. The ACR-1000 plant is a two-unit, integrated plant with each unit having a nominal gross output of about 1165 MWe with a net output of approximately 1085 MWe. The plant design is adaptable to a single unit configuration, if required. This paper focuses on the technical considerations that went into developing some of the important design requirements for the steam generators for the ACR-1000 plant and how these requirements are specified in the Technical Specification, which is the governing document for the steam generator (SG) detail design. Layout of these SGs in the plant is briefly described and their impacts on the SG design. (author)

  15. Design Concept of Array ECT Sensor for Steam Generator Tubing Inspection

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Chan Hee; Lee, Tae Hun; Yoo, Hyun Ju [Korea Hydro and Nuclear Power Co. Ltd. CRI, Daejeon (Korea, Republic of)

    2015-05-15

    The eddy current testing, which is one of the nondestructive examination methods, is widely used for the inspection of heat exchangers including steam generator tubing in the nuclear power plant. It uses electromagnetic induction to detect flaws in conductive materials. Two types of eddy current probes are conventionally used for the inspection of steam generator tubing according to the main purpose. One is the bobbin probe technology and the other is the rotating probe. During the inspection, they have restrictions for the flaw detection or the inspection speed. An array probe can be alternative to the bobbin and rotating probes. The design concept of array coils with high sensitivity is described in this paper. It is expected that the eddy current testing using this type of array sensors may provide high detectability and resolution for flaws in steam generator tubing. Eddy current technology has some barriers for the inspection of steam generator tubing in the nuclear power plant. Bobbin probes offer poor circumferential crack detection and rotating probes are time and money consuming due to the mechanical rotation. Array probe inspection technique can replace bobbin and rotating probe techniques due to its sensitivity for flaw detection and inspection speed. In general, circular-shaped coils are considered in an array eddy current probe.

  16. Integrity Analysis of Damaged Steam Generator Tubes

    International Nuclear Information System (INIS)

    Stanic, D.

    1998-01-01

    Variety of degradation mechanisms affecting steam generator tubes makes steam generators as one of the critical components in the nuclear power plants. Depending of their nature, degradation mechanisms cause different types of damages. It requires performance of extensive integrity analysis in order to access various conditions of crack behavior under operating and accidental conditions. Development and application of advanced eddy current techniques for steam generator examination provide good characterization of found damages. Damage characteristics (shape, orientation and dimensions) may be defined and used for further evaluation of damage influence on tube integrity. In comparison with experimental and analytical methods, numerical methods are also efficient tools for integrity assessment. Application of finite element methods provides relatively simple modeling of different type of damages and simulation of various operating conditions. The stress and strain analysis may be performed for elastic and elasto-plastic state with good ability for visual presentation of results. Furthermore, the fracture mechanics parameters may be calculated. Results obtained by numerical analysis supplemented with experimental results are the base for definition of alternative plugging criteria which may significantly reduce the number of plugged tubes. (author)

  17. Sludge cleaning in the steam generators: sludge Lancing e IBL

    International Nuclear Information System (INIS)

    Montoro, E.; Gonzalez, S.; Calderon, N.

    2013-01-01

    IBERDROLA Engineering and Construction has echoed the need for plants to remove oxide deposits (sludge) located on the secondary side, on the bottom plate and into the tube bundle steam steam generators. Therefore, and with its partner SAVAC SRA has developed a specific system consisting of applying a capillary water at very high pressure applied directly to the location of these oxides. (Author)

  18. Evaluation of cracking in steam generator feedwater piping in pressurized water reactor plants

    International Nuclear Information System (INIS)

    Goldberg, A.; Streit, R.D.

    1981-05-01

    Cracking in feedwater piping was detected near the inlet to steam generators in 15 pressurized water reactor plants. Sections with cracks from nine plants are examined with the objective of identifying the cracking mechanism and assessing various factors that might contribute to this cracking. Using transmission electron microscopy, fatigue striations are observed on replicas of cleaned crack surfaces. Calculations based on the observed striation spacings gave a cyclic stress value of 150 MPa (22 ksi) for one of the major cracks. The direction of crack propagation was invariably related to the piping surface and not to the piping axis. These two factors are consistent with the proposed concept of thermally induced, cyclic, tensile surface stresses and it is concluded that the overriding factor in the cracking problem was the presence of such undocumented cyclic loads

  19. Water chemistry and corrosion in water-steam circuits of nuclear power plants

    International Nuclear Information System (INIS)

    Gardent, R.; Menet, O.

    1981-01-01

    The water and steam circuits of steam generators in pressurized-water nuclear power plants are described together with the mechanism of denting, and the corrosion of spacer plates that leads to cracks in tubes by constriction. The different chemical specifications applicable to the water of the secondary circuit of the generators in normal operation and on first commissioning are listed. The results obtained and the measurements of chemical values taken in operation on the water in the secondary circuits of steam generators at Fessenheim and Bugey are presented [fr

  20. Ferritic steels for French LMFBR steam generators

    International Nuclear Information System (INIS)

    Aubert, M.; Mathieu, B.; Petrequin, P.

    1983-06-01

    Austenitic stainless steels have been widely used in many components of the French LMFBR. Up to now, ferritic steels have not been considered for these components, mainly due to their relatively low creep properties. Some ferritic steels are usable when the maximum temperatures in service do not exceed about 530 0 C. It is the case of the steam generators of the Phenix plant, where the exchange tubes of the evaporator are made of 2,25% Cr-1% Mo steel, stabilized or not by addition of niobium. These ferritic alloys have worked successfully since the first steam production in October 1973. For the SuperPhenix power plant, an ''all austenitic stainless alloy'' apparatus has been chosen. However, for the future, ferritic alloys offer potential for use as alternative materials in the evaporators: low alloys steels type 2,25% Cr-1% Mo (exchange tubes, tube-sheets, shells), or at higher chromium content type 9% Cr-2% Mo NbV (exchange tubes) or 12M Cr-1% Mo-V (tube-sheets). Most of these steels have already an industrial background, and are widely used in similar applications. The various potential applications of these steels are reviewed with regards to the French LMFBR steam generators, indicating that some points need an effort of clarification, for instance the properties of the heterogeneous ferritic/austenitic weldments

  1. Graphite-water steam-generating reactor in the USSR

    Energy Technology Data Exchange (ETDEWEB)

    Dollezhal, N A [AN SSSR, Moscow

    1981-10-01

    One of the types of power reactor used in the USSR is the graphite-water steam-generating reactor RBMK. This produces saturated steam at a pressure of 7MPa. Reactors giving 1GWe each have been installed at the Leningrad, Kursk, Chernobyl and other power stations. Further stations using reactors of this type are being built. A description is given of the fuel element design, and of the layout of the plant. The main characteristics of RBMK reactors using fuel of rated and higher enrichment are listed.

  2. Staranje cevi uparjalnikov v Jedrski elektrarni Krško: Aging of tubes in the Krško nuclear power plant's steam generators:

    OpenAIRE

    Androjna, Ferdo; Cizelj, Leon

    2000-01-01

    The paper reviews the domestic efforts devoted to the safe and reliable operation of the Krško nuclear power plant (NPP) at full power, close to the design limit of the steam generators (18% of plugged tubes) for a full decade. This includes an overview of the recent status and history of the degradation processes, discussion of repair criteria, defining the acceptable size of defects and selected results from safety analyses supporting the operation of degraded steam generator (SG) tubes. It...

  3. Design and manufacture of steam generators for replacement

    International Nuclear Information System (INIS)

    Hirano, Hiroshi; Kuri, Syuhei

    1995-01-01

    The basic specification of the steam generators for replacement as heat exchangers (the pressure, temperature, flow rate and thermal output on primary and secondary sides) is set same as that of steam generators before replacement, but the latest design reflecting the operation experience obtained so far and taking the countermeasures for preventing heating tube damage in it is adopted, such as the heating tubes made of TT 690 alloy, the tube support plates with four-lobe shape tube holes made of stainless steel, the stainless steel rest fittings of three in one set and so on. After the heating tube break accident in Mihama No. 2 plant, the quality control was further strengthened. The comparison of the specifications of the steam generators of respective plants before and after the replacement is shown. The main objective of improving steam generators is the heightening of the reliability of heating tubes against intergranular attack and primary water stress corrosion cracking. The improvements of heating tube material, tube support plate material, secondary side heat flow, the shape of tube holes of tube support plates, the method of expanding heating tubes, and vibration-controlling fittings are explained. As to the manufacturing procedure and quality control, the manufacture of raw materials, the build-up welding of tube plates, the manufacture of lower half shell plates, the tube hole making of support plates, the insection of outer cylinder, flow rate distribution plate. Support plates and heating tubes, the sealing welding and expanding of heating tubes, the fixing of rest fittings, the manufacture and fixing of water chamber cover, the manufacture of upper half shell, the fixing of parts inside it, the final joint and inspection are described. (K.I.)

  4. Steam generators clogging diagnosis through physical and statistical modelling

    International Nuclear Information System (INIS)

    Girard, S.

    2012-01-01

    Steam generators are massive heat exchangers feeding the turbines of pressurised water nuclear power plants. Internal parts of steam generators foul up with iron oxides which gradually close some holes aimed for the passing of the fluid. This phenomenon called clogging causes safety issues and means to assess it are needed to optimise the maintenance strategy. The approach investigated in this thesis is the analysis of steam generators dynamic behaviour during power transients with a mono dimensional physical model. Two improvements to the model have been implemented. One was taking into account flows orthogonal to the modelling axis, the other was introducing a slip between phases accounting for velocity difference between liquid water and steam. These two elements increased the model's degrees of freedom and improved the adequacy of the simulation to plant data. A new calibration and validation methodology has been proposed to assess the robustness of the model. The initial inverse problem was ill posed: different clogging spatial configurations can produce identical responses. The relative importance of clogging, depending on its localisation, has been estimated by sensitivity analysis with the Sobol' method. The dimension of the model functional output had been previously reduced by principal components analysis. Finally, the input dimension has been reduced by a technique called sliced inverse regression. Based on this new framework, a new diagnosis methodology, more robust and better understood than the existing one, has been proposed. (author)

  5. Sodium/water reactions in steam generators of liquid metal fast breeder reactors

    International Nuclear Information System (INIS)

    Hori, M.

    1980-01-01

    The status of the research and development on sodium/water reactions resulting from the leakage of water into sodium in LMFBR steam generators is reviewed. The importance of sodium/water reaction phenomena in the design and operation of steam generators is discussed. The effects of sodium/water reactions are evaluated and methods of protection against these phenomena are surveyed. The products of chemical reactions between sodium and water under steam generator conditions are H 2 , NaOH, Na 2 O and NaH. Together with the temperature rise due to the associated exothermic reaction, these reaction products cause effects such as self-wastage, single- and multi-target wastage, and rapid pressure increase, depending on the size of the leak hole or the magnitude of leak rate. As for the wastage phenomena of small leaks, the effects of various factors have been studied and experimental correlations, as well as some theoretical work, have been performed. To investigate the pressure phenomena of a large leak, large-scale tests have been conducted by various organizations, and the computer codes to analyse these phenomena have been developed and verified by experiments. In the design of steam generators, an initial failure up to a hypothetical double-ended guillotine rupture of a single heat transfer tube is widely used as the design basis leak. Protection systems for LMFBR plants consist of leak detection devices, leak termination devices, and reaction pressure relief devices. From analyses based on research and development activities, as well as from experience with leaks in steam generator test loops and reactor plants, it has been confirmed that protection systems can satisfactorily be designed to accommodate leak incidents in LMFBR plants. (author)

  6. Depth-Sizing Technique for Crack Indications in Steam Generator Tubing

    International Nuclear Information System (INIS)

    Cho, Chan Hee; Lee, Hee Jeong; Kim, Hong Deok

    2009-01-01

    The nuclear power plants have been safely operated by plugging the steam generator tubes which have the crack indications. Tube rupture events can occur if analysts fail to detect crack indications during in-service inspection. There are various types of crack indication in steam generator tubes and they have been detected by the eddy current test. The integrity assessment should be performed using the crack-sizing results from eddy current data when the crack indication is detected. However, it is not easy to evaluate the crack-depth precisely and consistently due to the complexity of the methods. The current crack-sizing methods were reviewed in this paper and the suitable ones were selected through the laboratory tests. The retired steam generators of Kori Unit 1 were used for this study. The round robin tests by the domestic qualified analysts were carried out and the statistical models were introduced to establish the appropriate depth-sizing techniques. It is expected that the proposed techniques in this study can be utilized in the Steam Generator Management Program

  7. Development of expanded type plugging technique for leaky tubes of steam generators of Indian PHWRs

    International Nuclear Information System (INIS)

    Das, Nirupam; Samuel, K.A.; Joemon, V.; Rupani, B.B.

    2006-01-01

    Steam generators are very important component of Nuclear Power Plant (NPP), as they are part of Primary Heat Transport (PHT) system of Pressurised Heavy Water Reactors (PHWRs). A nuclear power plant of 220 MWe capacity has four mushroom type steam generators, each consisting of 1830 U-tubes (16 mm outside diameter and 1 mm wall thickness) made of Incoloy-800 material. The tubes of 'tube and shell type steam generator' act as the pressure boundary of PHT System. Any structural failure of these tubes may lead to release of radioactivity along with plant outage and significant economic loss. Hence, it is necessary to plug the leaky tubes for continued and safe operation of a steam generator. An expanded type plugging technique has been developed at Reactor Engineering Division to plug the leaky tubes. This plugging technique is selected because of low residual stress imparted in the adjacent 'tube to tube-sheet' joints. This plug meets the various codal requirements of steam generator. A number of qualification trials have been carried out with such plugs in the mock up facility. The expanded plugs meet the design requirements for pull out strength and leak-tightness. This paper describes the design concept of the plug, developmental aspects and qualification of the plugging technique. (author)

  8. Microfabricated rankine cycle steam turbine for power generation and methods of making the same

    Science.gov (United States)

    Frechette, Luc (Inventor); Muller, Norbert (Inventor); Lee, Changgu (Inventor)

    2009-01-01

    In accordance with the present invention, an integrated micro steam turbine power plant on-a-chip has been provided. The integrated micro steam turbine power plant on-a-chip of the present invention comprises a miniature electric power generation system fabricated using silicon microfabrication technology and lithographic patterning. The present invention converts heat to electricity by implementing a thermodynamic power cycle on a chip. The steam turbine power plant on-a-chip generally comprises a turbine, a pump, an electric generator, an evaporator, and a condenser. The turbine is formed by a rotatable, disk-shaped rotor having a plurality of rotor blades disposed thereon and a plurality of stator blades. The plurality of stator blades are interdigitated with the plurality of rotor blades to form the turbine. The generator is driven by the turbine and converts mechanical energy into electrical energy.

  9. Liquid metal steam generator

    International Nuclear Information System (INIS)

    Wolowodiuk, W.

    1975-01-01

    A liquid metal heated steam generator is described which in the event of a tube failure quickly exhausts out of the steam generator the products of the reaction between the water and the liquid metal. The steam is generated in a plurality of bayonet tubes which are heated by liquid metal flowing over them between an inner cylinder and an outer cylinder. The inner cylinder extends above the level of liquid metal but below the main tube sheet. A central pipe extends down into the inner cylinder with a centrifugal separator between it and the inner cylinder at its lower end and an involute deflector plate above the separator so that the products of a reaction between the liquid metal and the water will be deflected downwardly by the deflector plate and through the separator so that the liquid metal will flow outwardly and away from the central pipe through which the steam and gaseous reaction products are exhausted. (U.S.)

  10. Development and validation of advanced oxidation protective coatings for super critical steam power plant

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, M.B.; Scheefer, M. [Alstom Power Ltd., Rugby (United Kingdom); Agueero, A. [Instituto Nacional de Tecnica Aerospacial (INTA) (Spain); Allcock, B. [Monitor Coatings Ltd. (United Kingdom); Norton, B. [Indestructible Paints Ltd. (United Kingdom); Tsipas, D.N. [Aristotle Univ. of Thessaloniki (Greece); Durham, R. [FZ Juelich (Germany); Xiang, Z. [Northumbria Univ. (United Kingdom)

    2006-07-01

    Increasing the efficiency of coal-fired power plant by increasing steam temperatures and pressures brings benefits in terms of cheaper electricity and reduced emissions, particularly CO{sub 2}. In recent years the development of advanced 9%Cr ferritic steels with improved creep strength has enabled power plant operation at temperatures in excess of 600 C, such that these materials are being exploited to construct a new generation of advanced coalfired plant. However, the move to higher temperatures and pressures creates an extremely hostile oxidising environment. To enable the full potential of the new steels to be achieved, it is vital that protective coatings are developed, validated under high temperature steam and applied to candidate components from the steam path. This paper reviews recent work conducted within the Framework V project ''Coatings for Supercritical Steam Cycles'' (SUPERCOAT) to develop and demonstrate advanced slurry and thermal spray coatings capable of providing steam oxidation protection at temperatures in excess of 620 C and up to 300 bar. The programme of work has demonstrated the feasibility of applying a number of candidate coatings to steam turbine power plant components and has generated long-term steam oxidation rate and failure data that underpin the design and application work packages needed to develop and establish this technology for new and retrofit plant. (orig.)

  11. Circumferential cracking of steam generator tubes

    International Nuclear Information System (INIS)

    Karwoski, K.J.

    1997-04-01

    On April 28, 1995, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 95-03, open-quote Circumferential Cracking of Steam Generator Tubes.close-quote GL 95-03 was issued to obtain information needed to verify licensee compliance with existing regulatory requirements regarding the integrity of steam generator tubes in domestic pressurized-water reactors (PWRs). This report briefly describes the design and function of domestic steam generators and summarizes the staff's assessment of the responses to GL 95-03. The report concludes with several observations related to steam generator operating experience. This report is intended to be representative of significant operating experience pertaining to circumferential cracking of steam generator tubes from April 1995 through December 1996. Operating experience prior to April 1995 is discussed throughout the report, as necessary, for completeness

  12. Steam generator sludge removal apparatus

    International Nuclear Information System (INIS)

    Schafer, B.W.; Werner, C.E.; Klahn, F.C.

    1992-01-01

    The present invention relates to equipment for cleaning steam generators and in particular to a high pressure fluid lance for cleaning sludge off the steam generator tubes away from an open tube lane. 6 figs

  13. Handling steam generator problems: the strategy for Ringhals 3 and 4

    International Nuclear Information System (INIS)

    Larsen, G.

    1992-01-01

    An examination in Sweden of twelve Pressurized Water Reactor steam generator tubes (six from Ringhals 3 and six from Ringhals 4) revealed that several had cracks in the roll transition zone, all tubes had shallow intergranular attacks at support plate (TSP) intersections, and some from Ringhals 3 had cracks in the TSP position due to intergranular stress corrosion. It was concluded that this could drastically limit the possibility of successfully operating Ringhals 3 (which entered commercial operation in 1981) to 2010, the year when all nuclear power in Sweden will be phased out. Two possible ways to deal with the problem were investigated: replace the steam generators and uprate the plant; operate with the existing steam generators and reduce the rate of degradation by lowering the primary water temperature, with most failed tubes repaired by sleeving. The analysis showed that replacement of the Ringhals 3 steam generators would be a good investment. As there were no attacks in the TSP intersections at Ringhals 4, which started commercial operation in 1983, it was assumed possible to operate this unit until 2010 without any temperature reduction. The economic evaluation for Ringhals 4 nevertheless indicated that it would be cost effective to replace the steam generators and uprate Ringhals 4 to 112%. However, a new economic study showed that it will still be cost effective to replace the steam generators at Ringhals 3, but it is not clear that there is still a case for replacement at Ringhals 4. Ringhals 3 steam generators will be replaced in 1995, while Ringhals 4 will continue to operate with the existing steam generators. (Author)

  14. Advances in steam generator service technology

    International Nuclear Information System (INIS)

    Perez, Ric

    1998-01-01

    The most recent advances in pressurized water reactor steam generator service technology are discussed in this article. Focus is on new developments in robotics, including the Remotely Operated Service Arm (ROSA III); repair and maintenance services on the SG secondary side; and the newest advances in SG inspection. These products and services save utility costs, shorten outage durations, enhance plant performance and safety, and reduce radiation exposure. (author)

  15. Advances in steam generator service technology

    International Nuclear Information System (INIS)

    Nair, B. R.; Bastin, J. J.

    1997-01-01

    This paper will discuss the most recent and innovative advances in the areas of pressurized water reactor (PWR) steam generator service technology. The paper will include detail of new products such as the Remotely Operated Service Arm (ROSA-III), laser welded sleeving, and laser welded Direct Tube Repair (DTR) - products and services that save utility costs, shorten outage durations, enhance plant performance and safety, and reduce radiation exposure. (author)

  16. Thermal-Hydraulic Analysis of a Once-Through Steam Generator Considering Performance Degradation

    International Nuclear Information System (INIS)

    Han, Hun Sik; Kang, Han Ok; Yoon, Ju Hyeon; Kim, Young In; Song, Jae Seung; Kim, Keung Koo

    2016-01-01

    Several countries have entered into a global race for the commercialization of SMRs, and considerable research and development have been implemented. Among the various reactor designs, many SMRs have adopted an integral type pressurized water reactor (PWR) to enhance the nuclear safety and system reliability. In the integral reactor design, a single reactor pressure vessel contains primary system components such as fuel and core, steam generators, pumps, and a pressurizer. For the component integration into a reactor vessel, it is important to design each component as small as possible. Thus, it is a common practice to employ a once-through steam generator in the integral reactor design due to its advantages in compactness. In general, gradual degradation in thermal-hydraulic performance of the steam generator occurs with time, and it changes slowly the operating point of the steam generator during plant lifetime. Numerical solutions are acquired to evaluate the thermal-hydraulic performance of the steam generator at various AUFs. The design results obtained show that the average tube length of the steam generator is augmented with the increase of design margin to compensate for the design uncertainties and heat transfer area reduction by plugging, fouling, etc. A helically coiled tube once-through steam generator with 30% design margin is considered for comparison of thermal-hydraulic performances according to the degradation rate

  17. Thermal-Hydraulic Analysis of a Once-Through Steam Generator Considering Performance Degradation

    Energy Technology Data Exchange (ETDEWEB)

    Han, Hun Sik; Kang, Han Ok; Yoon, Ju Hyeon; Kim, Young In; Song, Jae Seung; Kim, Keung Koo [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Several countries have entered into a global race for the commercialization of SMRs, and considerable research and development have been implemented. Among the various reactor designs, many SMRs have adopted an integral type pressurized water reactor (PWR) to enhance the nuclear safety and system reliability. In the integral reactor design, a single reactor pressure vessel contains primary system components such as fuel and core, steam generators, pumps, and a pressurizer. For the component integration into a reactor vessel, it is important to design each component as small as possible. Thus, it is a common practice to employ a once-through steam generator in the integral reactor design due to its advantages in compactness. In general, gradual degradation in thermal-hydraulic performance of the steam generator occurs with time, and it changes slowly the operating point of the steam generator during plant lifetime. Numerical solutions are acquired to evaluate the thermal-hydraulic performance of the steam generator at various AUFs. The design results obtained show that the average tube length of the steam generator is augmented with the increase of design margin to compensate for the design uncertainties and heat transfer area reduction by plugging, fouling, etc. A helically coiled tube once-through steam generator with 30% design margin is considered for comparison of thermal-hydraulic performances according to the degradation rate.

  18. Device indicating start of steam or water reaction with sodium and damage of steam generator heat exchange tube wall

    International Nuclear Information System (INIS)

    Jung, J.; Sobotka, J.

    1984-01-01

    Eddy currents induced by the alternating current of an exciting coil in the vicinity of steam or water leakage are used for indication. The coil is supplied from a power amplifier whose input is connected to an exciting generator by two measuring coils connected across each other. Their voltage is applied to a differential amplifier with an indicator. The equipment may be used for steam generators of nuclear power plants with sodium cooled reactors. (E.F.)

  19. The SNR-300 steam generator small leak detection system

    International Nuclear Information System (INIS)

    Dumm, K.

    1984-01-01

    Small leak detection in the SNR-300 steam generator moduls is achieved by hydrogen meters. Development and design of the Nickel membrane - ion getter pump combination are described and sensitivity requests derived. Results of calibration tests by water/steam injections in a sodium loop are presented. The arrangement and interconnection of signals in SNR-300 are given and possibilities for inservice calibrations are discussed, supported by long time operation tests in the KNK-reactor plant. (author)

  20. Questions raised in developing fast reactor steam generator designs

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, P A; Hayden, O

    1975-07-01

    The most important component in the achievement of satisfactory LMFBR reliability is the steam generator. When the failure statistics of other nuclear steam generators and the implications of a sodium water reaction are considered, there is some cause for concern. It is apparent that considerable improvement in technology is necessary and until more experience on operating plant is available a conservative design approach must be taken. Many solutions have been proposed, varying from forced circulation straight tube modular to large single vessel once through helical designs. The paper poses what are considered to be the main questions which arise when making a choice of fast reactor steam generator type and tube configuration. The aim is to promote discussion amongst the assembled experts on their relative design approaches and the importance placed upon the various factors in reaching our common goal of ensuring the success of the LMFBR in its essential role of conserving world energy resources. (author)

  1. Questions raised in developing fast reactor steam generator designs

    International Nuclear Information System (INIS)

    Taylor, P.A.; Hayden, O.

    1975-01-01

    The most important component in the achievement of satisfactory LMFBR reliability is the steam generator. When the failure statistics of other nuclear steam generators and the implications of a sodium water reaction are considered, there is some cause for concern. It is apparent that considerable improvement in technology is necessary and until more experience on operating plant is available a conservative design approach must be taken. Many solutions have been proposed, varying from forced circulation straight tube modular to large single vessel once through helical designs. The paper poses what are considered to be the main questions which arise when making a choice of fast reactor steam generator type and tube configuration. The aim is to promote discussion amongst the assembled experts on their relative design approaches and the importance placed upon the various factors in reaching our common goal of ensuring the success of the LMFBR in its essential role of conserving world energy resources. (author)

  2. Boresonic inspection of steam turbine and generator spindles with the Tomoscan

    International Nuclear Information System (INIS)

    Dube, N.; Bertholotti, D.; Yates, D.

    1990-01-01

    Steam turbine rotors in power utility plants can generate cracks and ultimately fail after long period of use. The inspection of rotors is done on a regular basis and particular attention is paid to areas near bore holes. An automated ultrasound system has been developed to control and ensure the quality of rotor bore holes of steam turbine rotors

  3. Some economic aspects of steam generator replacements in nuclear power plants

    International Nuclear Information System (INIS)

    Lebegner, J.

    1995-01-01

    The steam generator replacements performed over last decade (about 25 replacements until now), indicate trends towards improved techniques, shorter schedules and reduced total exposure and total costs. The goal of this paper is to give a worldwide review of SG replacement experience with accent on the economic aspect of the SG replacement. The main information about carried out replacements will be presented: cost, schedules, exposures, SG supplier and type, date of replacement, etc. Furthermore, the paper will contain the list of planned steam generator replacements in Europe, Japan and US future replacement plans. Finally, some of NPPs will be described whose initial nominal power has been increased along with SG replacement. (author)

  4. Automatic control of plants of direct steam generation with cylinder-parabolic solar collectors; Control automatico de plantas de generacion directa de vapor con colectores solares cilindro-parabolicos

    Energy Technology Data Exchange (ETDEWEB)

    Valenzuela Gutierrez, L.

    2008-07-01

    The main objective of this dissertation has been the contributions to the operation in automatic mode of a new generation of direct steam generation solar plants with parabolic-trough collectors. The dissertation starts introducing the parabolic-trough collectors solar thermal technology for the generation of process steam or steam for a Rankine cycle in the case of power generation generation, which is currently the most developed and commercialized technology. Presently, the parabolic-trough collectors technology is based on the configuration known as heat-exchanger system, based in the use of a heat transfer fluid in the solar field which is heated during the recirculation through the absorber tubes of the solar collectors, transferring later on the that thermal energy to a heat-exchanger for steam generation. Direct steam generation in the absorber tubes has always been shown as an ideal pathway to reduce generation cost by 15% and increase conversion efficiency by 20% (DISS, 1999). (Author)

  5. Steam generator tube rupture (SGTR) scenarios

    International Nuclear Information System (INIS)

    Auvinen, A.; Jokiniemi, J.K.; Laehde, A.; Routamo, T.; Lundstroem, P.; Tuomisto, H.; Dienstbier, J.; Guentay, S.; Suckow, D.; Dehbi, A.; Slootman, M.; Herranz, L.; Peyres, V.; Polo, J.

    2005-01-01

    The steam generator tube rupture (SGTR) scenarios project was carried out in the EU 5th framework programme in the field of nuclear safety during years 2000-2002. The first objective of the project was to generate a comprehensive database on fission product retention in a steam generator. The second objective was to verify and develop predictive models to support accident management interventions in steam generator tube rupture sequences, which either directly lead to severe accident conditions or are induced by other sequences leading to severe accidents. The models developed for fission product retention were to be included in severe accident codes. In addition, it was shown that existing models for turbulent deposition, which is the dominating deposition mechanism in dry conditions and at high flow rates, contain large uncertainties. The results of the project are applicable to various pressurised water reactors, including vertical steam generators (western PWR) and horizontal steam generators (VVER)

  6. Minimize corrosion degradation of steam generator tube materials

    International Nuclear Information System (INIS)

    Lu, Y.

    2006-01-01

    As part of a coordinated program, AECL is developing a set of tools to aid with the prediction and management of steam generator performance. Although stress corrosion cracking (of Alloy 800) has not been detected in any operating steam generator, for life management it is necessary to develop mechanistic models to predict the conditions under which stress corrosion cracking is plausible. Experimental data suggest that all steam generator tube materials are susceptible to corrosion degradation under some specific off-specification conditions. The tolerance to the chemistry upset for each steam generator tube alloy is different. Electrochemical corrosion behaviors of major steam generator tube alloys were studied under the plausible aggressive crevice chemistry conditions. The potential hazardous conditions leading to steam generator tube degradation and the conditions, which can minimize steam generator tube degradation have been determined. Recommended electrochemical corrosion potential/pH zones were defined for all major steam generator tube materials, including Alloys 600, 800, 690 and 400, under CANDU steam generator operating and startup conditions. Stress corrosion cracking tests and accelerated corrosion tests were carried out to verify and revise the recommended electrochemical corrosion potential/pH zones. Based on this information, utilities can prevent steam generator material degradation surprises by appropriate steam generator water chemistry management and increase the reliability of nuclear power generating stations. (author)

  7. Steam producing plant concept of 4S for oil sand extraction

    International Nuclear Information System (INIS)

    Matsuyama, Shinichiro; Nishiguchi, Youhei; Sakashita, Yoshiaki; Kasuga, Shoji; Kawashima, Masatoshi

    2009-01-01

    Plant concept of small fast reactor '4S' applying to continuous steam production for recovery of crude oil from oil sands was investigated. Assuming typical steam assisted gravity drainage (SAGD) plant whose production scale is 120,000 barrels per day of a crude oil, concept of nuclear steam supply system consisting of eight reactor modules for steam production and three reactor modules for electric generation of the 4S with a thermal rating of 135 MWt was established without any essential or significant design change from the preceding 4S with a thermal rating of 30 MWt. The 4S, provided for an oil sand extraction, will reduce greenhouse gas emission significantly, and has not much burden for development and licensing and has economic competitiveness. (author)

  8. Steam generator life-management, reliability, maintenance and refurbishment

    International Nuclear Information System (INIS)

    Spekkens, P.

    2012-01-01

    SGC 2012 is a different kind of a conference - it has its own focus, initiatives and objectives and differs from its predecessors. It originated as the Steam Generator and Heat Exchanger Conference in 1990 - a time when premature degradation of steam generators with Alloy 600 tubes was rampant world-wide, and some CANDU steam generators had started to experience significant fouling and corrosion issues. The six previous steam generator conferences were held on a regular cycle, in a very similar format and with a similar theme. We are now in a different era in steam generators. The Alloy 600 tubing has been largely replaced by more robust materials, and the CANDU steam generators have been brought under much more intense and effective life cycle management. Performance of steam generators has improved greatly, and they are no longer considered at risk of limiting the life of the units. Indeed, most Incoloy 800 steam generators in CANDU units are considered to be capable of operating reliably through the 'second life' of the units and are not being replaced during refurbishments. Given this changing environment, the scope of this conference has been expanded from one to three areas: steam generators and heat exchangers as before, but also; controls, valves and pumps, and; reactor components and systems, Programs A, B and C, respectively. The conference is targeting to address the needs and interests of the operating utilities, and to 'focus on what needs attention'. As a means of 'focusing on what needs attention' an 'Issue-Identification and Definition' program was initiated last winter. The Issue-Identification Team operating with COG President Bob Morrison as its Executive Lead, worked to identify issues requiring attention in the three areas of interest. Of the many issues identified by the Team and elaborated on by the Program Developers of this conference, four were recommended for special attention: A. 'Operate Clean - Build Clean - Plant Wide': Despite their

  9. Evaluation of sulfur hexafluoride and helium for steam generator leak location: Final report

    International Nuclear Information System (INIS)

    Kassen, W.R.

    1987-01-01

    Since the use of sulfur hexafluoride as a tracer for identifying sources of primary to secondary leakage in PWR steam generators appeared to offer significant sensitivity advantages, the thermal stability of sulfur hexafluoride in water was evaluated at steam generator operating temperature. Significant decomposition was observed after 2 to 4 hours at temperature. Key decomposition products were fluoride and sulfide ions. Based on this observation and these limited test results, the use of SF 6 for PWR steam generator leak location can not be recommended at this time. A survey of 15 utilities was conducted in regard to their application experience with the helium tracer-mass spectroscopy technique for steam generator leak location. Although several successful steam generator integrity programs do not include use of this technique, it has proven to be a useful addition to the inspection program at some plants. No corrosion concerns appear to be associated with this technique

  10. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  11. Prediction of localized flow velocities and turbulence in a PWR steam generator: Final report

    International Nuclear Information System (INIS)

    Stuhmiller, J.H.

    1988-05-01

    The Steam Generator Project Office (SGPO) of the Steam Generator Owners Group and Electric Power Research Institute has developed a methodology for prediction of steam generator tube buffeting and associated material wear. Turbulent buffeting of steam generator tubes causes low amplitude vibratory response which results in fretting wear at support locations. Concerns raised at the Zion Nuclear Power Plant regarding the useful life of their steam generators prompted this study, in which the SGPO methodology is applied to analysis of the Westinghouse Model 51 steam generator. The specific intent of this project was to calculate turbulent buffeting forces within the tube bank of an operating Model 51 steam generator as a first step in the overall SGPO tube vibration and wear prediction strategy. Attention is focused on flow in the vicinity of anti-vibration bars (U-bend region) and on the flow that leaves the downcomer to impact against peripheral tubes. Other projects utilized the buffeting forces calculated here to determine tube vibratory response, tube-support plate impact statistics, and material wear rates. Besides successfully calculating hydraulic buffeting loads within the tube bank, the present project has enhanced the SGPO methodology and has identified hitherto unnoticed flow phenomena that occur in the steam generator. Experiments have also been carried out to validate numerical computations of the steam generator flow field

  12. PWR steam generator chemical cleaning. Phase I: solvent and process development. Volume II

    International Nuclear Information System (INIS)

    Larrick, A.P.; Paasch, R.A.; Hall, T.M.; Schneidmiller, D.

    1979-01-01

    A program to demonstrate chemical cleaning methods for removing magnetite corrosion products from the annuli between steam generator tubes and the tube support plates in vertical U-tube steam generators is described. These corrosion products have caused steam generator tube ''denting'' and in some cases have caused tube failures and support plate cracking in several PWR generating plants. Laboratory studies were performed to develop a chemical cleaning solvent and application process for demonstration cleaning of the Indian Point Unit 2 steam generators. The chemical cleaning solvent and application process were successfully pilot-tested by cleaning the secondary side of one of the Indian Point Unit 1 steam generators. Although the Indian Point Unit 1 steam generators do not have a tube denting problem, the pilot test provided for testing of the solvent and process using much of the same equipment and facilities that would be used for the Indian Point Unit 2 demonstration cleaning. The chemical solvent selected for the pilot test was an inhibited 3% citric acid-3% ascorbic acid solution. The application process, injection into the steam generator through the boiler blowdown system and agitation by nitrogen sparging, was tested in a nuclear environment and with corrosion products formed during years of steam generator operation at power. The test demonstrated that the magnetite corrosion products in simulated tube-to-tube support plate annuli can be removed by chemical cleaning; that corrosion resulting from the cleaning is not excessive; and that steam generator cleaning can be accomplished with acceptable levels of radiation exposure to personnel

  13. Makeup water system performance and impact on PWR steam generator corrosion

    International Nuclear Information System (INIS)

    Bell, M.J.; Sawocha, S.G.; Smith, L.A.

    1984-01-01

    The object of this EPRI-funded project was to assess the possible relation of pressurized water reactor (PWR) steam generator corrosion at fresh water sites to makeup water impurity ingress. Makeup water system design, operation and performance reviews were based on site visits, plant design documents, performance records and grab sample analyses. Design features were assessed in terms of their effect on makeup system performance. Attempts were made to correlate the makeup plant source water, system design characteristics, and typical makeup water qualities to steam generator corrosion observations, particularly intergranular attack (IGA). Direct correlations were not made since many variables are involved in the corrosion process and in the case of IGA, the variables have not been clearly established. However, the study did demonstrate that makeup systems can be a significant source of contaminants that are suspected to lead to both IGA and denting. Additionally, it was noted that typical makeup system performance with respect to organic removal was not good. The role of organics in steam generator damage has not been quantified and may deserve further study

  14. Hard sludge formation in modern steam generators of nuclear power plants. Formation, risks and mitigation

    International Nuclear Information System (INIS)

    Strohmer, F.

    2014-01-01

    In recent years modern steam generators with triangular pitch tube bundle geometry have experienced damage caused by hard sludge formation on top of the tube sheet and denting. The effect can lead to a limitation of the modern steam generators’ lifetime. The current publication shows reasons for the generation of hard sludge formation. Moreover, it describes the risk arising from hard sludge formation for the concerned steam generators and the mitigation of the problem. The main factors contributing to the formation of hard sludge are: the amount of corrosion product ingress into the steam generators, hard sludge formation favouring impurities and, skipped maintenance applications during outages. The main damaging mechanism of denting that can arise under certain secondary side conditions from hard sludge is explained. For steam generator tube denting, aggressive, oxidizing conditions have to be established in crevices beneath the hard sludge piles. Severely dented tubes are sensitive toward outer diameter stress corrosion cracking (ODSCC). The denting and ODSCC mechanism is explained. In addition, a proactive long-term maintenance strategy to avoid the formation of hard sludge piles will be shown. The strategy is based on a reduction of the corrosion product ingress into the steam generator's secondary side, and on the regular removal of deposits from the tube sheet and from the entire upper bundle area by latest mechanical cleaning methods. For hard deposits - formed either by silicates or long term hardened corrosion products, which, in the past, could not be removed by chemical or mechanical means - a new, simple, mechanical cleaning method is presented. This method can be used during the normal time frame of an outage and allows the restart of the unit with clean steam generator tube sheets. This mitigates the tendency to form hard sludge and denting in the long term. (author)

  15. Extending service life of steam generators by sleeving tubes

    International Nuclear Information System (INIS)

    Gutzwiller, J.E.

    1982-01-01

    Steam generator tubes that are failing due to IGA in the tubesheet crevice can be kept in service by using the basic sealable sleeve design developed by BandW. Variations of the present sleeve design could significantly reduce the number of tubes that must be plugged each year. Sleeving had the potential of keeping 28 percent more tubes in service during 1979. Lowering the overall rate at which tubes are removed from service by plugging will reduce the probability of having to derate the plant or replace the steam generator. Considering tomorrow's replacement power costs, sleeving to keep tubes in service is a practical and sound investment

  16. Fracture toughness determination in steam generator tubes

    International Nuclear Information System (INIS)

    Bergant M; Yawny, A; Perez Ipina, J

    2012-01-01

    The assessment of the structural integrity of steam generator tubes in nuclear power plants deserved increasing attention in the last years due to the negative impact related to their failures. In this context, elastic plastic fracture mechanics (EPFM) methodology appears as a potential tool for the analysis. The application of EPFM requires, necessarily, knowledge of two aspects, i.e., the driving force estimation in terms of an elastic plastic toughness parameter (e.g., J) and the experimental measurement of the fracture toughness of the material (e.g., the material J-resistance curve). The present work describes the development of a non standardized experimental technique aimed to determine J-resistance curves for steam generator tubes with circumferential through wall cracks. The tubes were made of Incoloy 800 (Ni: 30.0-35.0; Cr: 19.0-23.0; Fe: 35.5 min, % in weight). Due to its austenitic microstructure, this alloy shows very high toughness and is widely used in applications where a good corrosion resistance in aqueous environment or an excellent oxidation resistance in high temperature environment is required. Finally, a procedure for the structural integrity analysis of steam generator tubes with crack-like defects, based on a FAD diagram (Failure Assessment Diagram), is briefly described (author)

  17. Thermal performances of molten salt steam generator

    International Nuclear Information System (INIS)

    Yuan, Yibo; He, Canming; Lu, Jianfeng; Ding, Jing

    2016-01-01

    Highlights: • Thermal performances of molten salt steam generator were experimentally studied. • Overall heat transfer coefficient reached maximum with optimal molten salt flow rate. • Energy efficiency first rose and then decreased with salt flow rate and temperature. • Optimal molten salt flow rate and temperature existed for good thermal performance. • High inlet water temperature benefited steam generating rate and energy efficiency. - Abstract: Molten salt steam generator is the key technology for thermal energy conversion from high temperature molten salt to steam, and it is used in solar thermal power station and molten salt reactor. A shell and tube type molten salt steam generator was set up, and its thermal performance and heat transfer mechanism were studied. As a coupling heat transfer process, molten salt steam generation is mainly affected by molten salt convective heat transfer and boiling heat transfer, while its energy efficiency is also affected by the heat loss. As molten salt temperature increased, the energy efficiency first rose with the increase of heat flow absorbed by water/steam, and then slightly decreased for large heat loss as the absorbed heat flow still rising. At very high molten salt temperature, the absorbed heat flow decreased as boiling heat transfer coefficient dropping, and then the energy efficiency quickly dropped. As the inlet water temperature increased, the boiling region in the steam generator remarkably expanded, and then the steam generation rate and energy efficiency both rose with the overall heat transfer coefficient increasing. As the molten salt flow rate increased, the wall temperature rose and the boiling heat transfer coefficient first increased and then decreased according to the boiling curve, so the overall heat transfer coefficient first increased and then decreased, and then the steam generation rate and energy efficiency of steam generator both had maxima.

  18. ANL/CANTIA code for steam generator tube integrity assessment

    International Nuclear Information System (INIS)

    Revankar, S.T.; Wolf, B.; Majumdar, S.; Riznic, J.R.

    2009-01-01

    Steam generator (SG) tubes have an important safety role in CANDU type reactors and Pressurized Water Reactors (PWR) because they constitute one of the primary barriers between the radioactive and non-radioactive sides of the nuclear plant. The SG tubes are susceptible to corrosion and damage. A failure of a single steam generator tube, or even a few tubes, would not be a serious safety-related event in a CANDU reactor. The leakage from a ruptured tube is within makeup capacity of the primary heat transport system, so that as long as the operator takes the correct actions, the off-site consequences will be negligible. A sufficient safety margin against tube rupture used to be the basis for a variety of maintenance strategies developed to maintain a suitable level of plant safety and reliability. Several through-wall flaws may remain in operation and potentially contribute to the total primary-to-secondary leak rate. Assessment of the conditional probabilities of tube failures, leak rates, and ultimately risk of exceeding licensing dose limits has been used for steam generator tube fitness-for-service assessment. The advantage of this type of analysis is that it avoids the excessive conservatism typically present in deterministic methodologies. However, it requires considerable effort and expense to develop all of the failure, leakage, probability of detection, and flaw growth distributions and models necessary to obtain meaningful results from a probabilistic model. The Canadian Nuclear Safety Commission (CNSC) recently developed the CANTIA methodology for probabilistic assessment of inspection strategies for steam generator tubes as a direct effect on the probability of tube failure and primary-to-secondary leak rate Recently Argonne National Laboratory has developed tube integrity and leak rate models under Integrated Steam Generator Tube Integrity Program (ISGTIP-2). These models have been incorporated in the ANL/CANTIA code. This paper presents the ANL

  19. Pollution prevention opportunity assessment for the K-25 Site Steam Plant -- Level 3

    International Nuclear Information System (INIS)

    1995-09-01

    A Level 3 pollution prevention opportunity assessment (PPOA) was performed for the K-1501 Steam Plant at the K-25 Site. The primary objective was to identify and evaluate pollution prevention (P2) options to reduce the quantities of each waste stream generated by the Steam Plant. For each of the waste streams, P2 options were evaluated to first reduce the quantity of waste generated and second to recycle the waste. This report provides a process description of the facility; identification, evaluation, and recommendations of P2 options; an implementation schedule with funding sources; and conclusions. Largely for economic reasons, only 3 of the 14 P2 options are being recommended for implementation. All are source reduction options. When implemented, these three options are estimated to reduce the annual generation of waste by 658,412 kg and will result in a cost savings of approximately $29,232/year for the K-25 Site. The recommended options are to: install a flue gas return System in Boiler 7; reduce steam loss from traps; and increase lapse time between rinses. The four boilers currently in operation at the Steam Plant use natural gas or fuel oil as fuel sources

  20. The decommissioning of the BR3 steam generator

    International Nuclear Information System (INIS)

    Denissen, L.

    2006-01-01

    A steam generator is a crucial component in a PWR (Pressurized Water Reactor). It is the crossing between the primary, contaminated, circuit and the secondary water-steam circuit. The heat from the primary reactor coolant loop is transferred to the secondary side in thousands of small tubes. Due to several problems in the material of those tubes, like SCC (Stress Corrosion Cracking), insufficient control in water chemistry, which can be the cause of tube leakage, more and more steam generators are replaced today. Only in Belgium, already 17 of them are replaced. The old 300 ton heavy SGs are stored at the 2 nuclear power plants of Doel and Tihange . While it was foreseen in the BR3 strategy to dismantle the steam generator (only 30 ton), we took the opportunity to search for a complete package in the decommissioning of a steam generator. The complete management consists of a decontamination of the primary side followed by the complete dismantling. The first step, the decontamination with MEDOC (water box + tube bundle) has already been achieved in 2002. It has led to an important DF (Decontamination Factor) between 100 and 1000 and an important dose rate reduction. This hard chemical decontamination process has been described earlier in the scientific report 2002 (The BR3 steam generator decontamination with the MEDOC process - M. Ponnet). The second step, the complete dismantling of the SG has been executed in 2005. With the BR3 SG, the main goal was to dismantle it in a safe way and to free release a maximum of material. We've used two cutting tools to perform the job: A HPWJC (High Pressure Water Jet Cutting) tool in combination with a hydraulic robot and a water cooled diamond cable. The last technique was done in close collaboration with the external company Husqvarna. It was important to have an idea of the performance, the efficiency of the cable and the quantity and the type of secondary waste

  1. Steam generator secondary side chemical cleaning at Gentilly-2

    International Nuclear Information System (INIS)

    Plante, S.

    2006-01-01

    After more than 20 years of operation, the secondary side of the four steam generators at Gentilly-2 were chemically cleaned during the 2005 annual outage. The FRAMATOME ANP high temperature cleaning process used to remove magnetite loading involved stepwise injection of solvent with PHT temperature in the range 160 o C to 175 o C. The heat required to maintain the PHT temperature was provided by the operation of the main PHT pumps and the reactor core residual heat. The temperature control was accomplished by the shutdown cooling system heat exchangers. A total of 1280 kg of magnetite was removed from the four steam generators. A copper-cleaning step was applied after the iron step. The PHT has been cooled down and the steam generators drained to temporary tanks and dried in preparation of the copper step. The process has been applied at room temperature, two boilers at a time. The solvent removed a total of 116 kg of copper. During the iron step, steam flow to the feedwater tank chemically contaminate the Balance Of Plant (BOP) systems. The isolation of this path should have been part of the G2 procedures. Around 700 m3 of water had to be drained to interim storage tanks for subsequent resin treatment before disposal. Visual inspection of BO1 tubesheet and first support plate showed clean surfaces without measurable sludge pile. Upper support plates visual inspection of BO4 revealed that broach holes blockage reported in 2000 is still present in peripheral area. Following the plant restart, the medium range level measurement instability observed since several years for BO3 was no more present. As anticipated, it also has been observed that the medium and wide range level measurements have shifted down as a result of downcomer flow increase after the cleaning. The cleaning objectives were achieved regarding the fouling reduction on the steam generators secondary side but broach holes blockage of the upper support plate is still present in periphery. (author)

  2. Some causes of vibrations recorded by in-service diagnostic systems in steam generators of units 1 and 2 of Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Sadilek, J.; Matal, O.

    1989-01-01

    A brief description is presented of the design of the steam generators of the first and second units of the Dukovany nuclear power plant. Attention is also given to the feed water systems and the diagnostic systems. The causes are analyzed of the irregularly occurring vibrations in the steam generators in service. It is demonstrated that the source of the vibrations transmitted to the steam generators are the valves in the feeding tract. The vibrations are induced by dynamic forces from the feed water. Reducing the water pressure at the delivery of the electric feed pumps by reducing the size of the rotor, etc., does not remove all vibrations. It is therefore recommended that valves be ins+alled with better regulating characteristics. (Z.M.). 6 figs., 1 tab., 3 refs

  3. Decomposition of some amines and amino acids in steam generator environments

    International Nuclear Information System (INIS)

    Jayaweera, P.; Hettiarachchi, S.; Millett, P.J.

    1994-01-01

    Hydrothermal decomposition rate constants and high temperature pH values of some selected high-molecular weight amines and amino acids were measured under simulated steam generator conditions. These amines and amino acids were evaluated as potential crevice buffering agents for steam generator applications in pressurized water reactors. The study showed that, although the high molecular weight amines undergo hydrothermal decomposition, they have a better buffer capacity than their low molecular weight counterparts at 290 C. The amines provide effective crevice buffering by increasing the pH of the simulated crevice solution by as much as 2.84 to 4.24 units. However, volatility data for the amines and amino acids are needed before in-plant testing to ensure that amines can concentrate sufficiently in steam generator crevices to provide effective buffering

  4. Theoretical study on a multivariate feedback control of a sodium-heated steam generator

    International Nuclear Information System (INIS)

    Takahashi, R.; Maruyama, Y.; Oikawa, T.

    1984-01-01

    This paper applies the connection of a multivariate feedback controller with a state estimator to a 1-MW sodium-heated steam generator for LMFBR theoretically, to obtain a control strategy which emphasizes, from the view point of safety and availability of the FBR plant, that a superheat of 30 0 C should be required for the evaporator steam. This involves a trial to study the feasibility for the estimation of such an inaccessible variable as the dry-out location of tubes and utilize the state estimate to design a feedback controller of steam generators. The Kalman filter tested was found to generate reasonable estimates of the transient process variables of the steam generator and can provide a major advantage of regulating steam condition of the system even in the presence of contamination by a rather high level of measurement noise in the view point of economic uses of micro- and/or minicomputers. (orig.)

  5. Steam generators: critical components in nuclear steam supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Stevens-Guille, P D

    1974-02-28

    Steam generators are critical components in power reactors. Even small internal leaks result in costly shutdowns for repair. Surveys show that leaks have affected one half of all water-cooled reactors in the world with steam generators. CANDU reactors have demonstrated the highest reliability. However, AECL is actively evolving new technology in design, manufacture, inspection and operation to maintain reliability. (auth)

  6. Check of condition of steam generators, volume compensators and turbine condensers in nuclear power plants

    International Nuclear Information System (INIS)

    Matal, O.; Klinga, J.; Holy, F.; Sobotka, J.

    1989-01-01

    A negative pressure leak detector is described designed for leak testing of tubes in steam generators and steam turbine condensers. The principle, operation and use are described of inflatable bags and an inflatable platform. The bags are designed for insulating and sealing spaces in nuclear reactor components while the inflatable platform is used in pressurizer inspections and repairs. Their properties, and other facilities for detecting leaks in steam generator tubes are briefly described. (M.D.). 3 figs

  7. Moisture separator for steam generator level measurement system

    International Nuclear Information System (INIS)

    Cantineau, B.J.

    1987-01-01

    A steam generator level measurement system having a reference leg which is kept full of water by a condensation pot, has a liquid/steam separator in the connecting line between the condensation pot and the steam phase in the steam generator to remove excess liquid from the steam externally of the steam generator. This ensures that the connecting line does not become blocked. The separator pot has an expansion chamber which slows down the velocity of the steam/liquid mixture to aid in separation, and a baffle, to avoid liquid flow into the line connected to the condensate pot. Liquid separated is returned to the steam generator below the water level through a drain line. (author)

  8. U.S. LMFBR steam generators materials considerations and waterside chemistry issues

    Energy Technology Data Exchange (ETDEWEB)

    Spalaris, C N

    1975-07-01

    This report describes the materials and waterside chemistry topics most relevant to the steam generator system for the Clinch River Breeder Reactor Plant. Development programs necessary to support or confirm design and plant operating conditions are summarized, together with selected test results obtained to date. (author)

  9. U.S. LMFBR steam generators materials considerations and waterside chemistry issues

    International Nuclear Information System (INIS)

    Spalaris, C.N.

    1975-01-01

    This report describes the materials and waterside chemistry topics most relevant to the steam generator system for the Clinch River Breeder Reactor Plant. Development programs necessary to support or confirm design and plant operating conditions are summarized, together with selected test results obtained to date. (author)

  10. Control concepts for direct steam generation in parabolic troughs

    Energy Technology Data Exchange (ETDEWEB)

    Valenzuela, Loreto; Zarza, Eduardo [CIEMAT, Plataforma Solar de Almeria, Tabernas (Almeria) (Spain); Berenguel, Manuel [Universidad de Almeria, Dept. de Lenguajes y Computacion, Almeria (Spain); Camacho, Eduardo F. [Universidad de Sevilla, Dept. de Ingenieria de Sistemas y Automatica, Sevilla (Spain)

    2005-02-01

    A new prototype parabolic-trough collector system was erected at the Plataforma Solar de Almeria (PSA) (1996-1998) to investigate direct steam generation (DSG) in a solar thermal power plant under real solar conditions. The system has been under evaluation for efficiency, cost, control and other parameters since 1999. The main objective of the control system is to obtain steam at constant temperature and pressure at the solar field outlet, so that changes in inlet water conditions and/or in solar radiation affect the amount of steam, but not its quality or the nominal plant efficiency. This paper presents control schemes designed and tested for two operating modes, 'Recirculation', for which a proportional-integral-derivative (PI/PID) control functions scheme has been implemented, and 'Once-through', requiring more complex control strategies, for which the scheme is based on proportional-integral (PI), feedforward and cascade control. Experimental results of both operation modes are discussed. (Author)

  11. Disposal and handling of nuclear steam generator chemical cleaning wastes

    International Nuclear Information System (INIS)

    Larrick, A.P.; Schneidmiller, D.

    1978-01-01

    A large number of pressurized water nuclear reactor electrical generating plants have experienced a corrosion-related problem with their steam generators known as denting. Denting is a mechanical deformation of the steam generator tubes that occurs at the tube support plates. Corrosion of the tube support plates occurs within the annuli through which the tubes pass and the resulting corrosion oxides, which are larger in volume than the original metal, compress and deform the tubes. In some cases, the induced stresses have been severe enough to cause tube and/or support cracking. The problem was so severe at the Turkey Point and Surrey plants that the tubing is being replaced. For less severe cases, chemical cleaning of the oxides, and other materials which deposit in the annuli from the water, is being considered. A Department of Energy-sponsored program was conducted by Consolidated Edison Co. of New York which identified several suitable cleaning solvents and led to in-plant chemical cleaning pilot demonstrations in the Indian Point Unit 1 steam generators. Current programs to improve the technology are being conducted by the Electric Power Research Institute, and the three PWR NSSS vendors with the assistance of numerous consultants, vendors, and laboratories. These programs are expected to result in more effective, less corrosive solvents. However, after a chemical cleaning is conducted, a large problem still remains- that of disposing of the spent wastes. The paper summarizes some of the methods currently available for handling and disposal of the wastes

  12. Development of fuzzy algorithm with learning function for nuclear steam generator level control

    International Nuclear Information System (INIS)

    Park, Gee Yong; Seong, Poong Hyun

    1993-01-01

    A fuzzy algorithm with learning function is applied to the steam generator level control of nuclear power plant. This algorithm can make its rule base and membership functions suited for steam generator level control by use of the data obtained from the control actions of a skilled operator or of other controllers (i.e., PID controller). The rule base of fuzzy controller with learning function is divided into two parts. One part of the rule base is provided to level control of steam generator at low power level (0 % - 30 % of full power) and the other to level control at high power level (30 % - 100 % of full power). Response time of steam generator level control at low power range with this rule base is shown to be shorter than that of fuzzy controller with direct inference. (Author)

  13. Detection and mode identification of axial cracks in the steam generator tube of the nuclear power plant using ultrasonic guided wave

    International Nuclear Information System (INIS)

    Yoon, Byungsik; Yang, Seunghan; Lee, Heejong; Kim, Yongsik

    2010-01-01

    For those people who are involved in NDE, there is a growing concern regarding the significant traveling distance of a guided wave in a structure, which ensures the inspection of a large area of the structure from a single location. A significant number of studies on the guided wave have therefore been made to apply the foregoing to a nondestructive evaluation in many different industries and resulted in an increase in the efficiency of practical guided wave inspection. Unlike the previous studies based mainly on the detection of circumferential flaws, this study is focused on the axial flaw detection in the steam generator tubes of Korean standard nuclear power plants by generating the guided wave by changing frequency and selecting the applicable mode from the dispersion curve for the steam generator tube calculated in this study, where the dispersion-based short-time Fourier transform (D-STFT) algorithm is used to enhance mode identification. In conclusion, the L (0,1) mode at 2.25 MHz is found to be most sensitive in detecting axial flaws in a steam generator tube. (author)

  14. Power plant and system for accelerating a cross compound turbine in such plant, especially one having an HTGR steam supply

    International Nuclear Information System (INIS)

    Jaegtnes, K.O.; Braytenbah, A.S.

    1977-01-01

    An electric power plant having a cross compound steam turbine and a steam source that includes a high temperature gas-cooled nuclear reactor is described. The steam turbine includes high and intermediate-pressure portions which drive a first generating means, and a low-pressure portion which drives a second generating means. The steam source supplies superheat steam to the high-pressure turbine portion, and an associated bypass permits the superheat steam to flow from the source to the exhaust of the high-pressure portion. The intermediate and low-pressure portions use reheat steam; an associated bypass permits reheat steam to flow from the source to the low-pressure exhaust. An auxiliary turbine driven by steam exhausted from the high-pressure portion and its bypass drives a gas blower to propel the coolant gas through the reactor. While the bypass flow of reheat steam is varied to maintain an elevated pressure of reheat steam upon its discharge from the source, both the first and second generating means and their associated turbines are accelerated initially by admitting steam to the intermediate and low-pressure portions. The electrical speed of the second generating means is equalized with that of the first generating means, whereupon the generating means are connected and acceleration proceeds under control of the flow through the high-pressure portion. 29 claims, 2 figures

  15. Water level control for a nuclear steam generator

    International Nuclear Information System (INIS)

    Wen Tan

    2011-01-01

    Research highlights: → A water level control system for a nuclear steam generator (SG) is proposed. → The parameters of the control system are directly related to those of the plant model thus scheduling is easy to implement in practice. → The proposed gain-scheduled controller can achieve good performance at both low and high power levels. - Abstract: A water level control system for a nuclear steam generator (SG) is proposed. The control system consists of a feedback controller and a feedforward controller. The feedback controller is of first order, the feedforward controller is of second order, and parameters of the two controllers are directly related to the parameters of plant model thus scheduling is easy to implement in practice. Robustness and performance of the feedback and the feedforward controllers are analyzed in details and tuning of the two parameters of the controllers are discussed. Comparisons among a single robust controller, a multi-model controller and a gain-scheduled controller are studied. It is shown that the proposed gain-scheduled controller can achieve good performance at both low and high power levels.

  16. Passive system with steam-water injector for emergency supply of NPP steam generators

    International Nuclear Information System (INIS)

    Il'chenko, A.G.; Strakhov, A.N.; Magnitskij, D.N.

    2009-01-01

    The calculation results of reliability indicators of emergency power supply system and emergency feed-water supply system of serial WWER-1000 unit are presented. To ensure safe water supply to steam generators during station blackout it was suggested using additional passive emergency feed-water system with a steam-water injector working on steam generators dump steam. Calculated analysis of steam-water injector operating capacity was conducted at variable parameters of steam at the entrance to injector, corresponding to various moments of time from the beginning of steam-and-water damping [ru

  17. Thermal-hydraulics in recirculating steam generators

    International Nuclear Information System (INIS)

    Carver, M.B.; Carlucci, L.N.; Inch, W.W.R.

    1981-04-01

    This manual describes the THIRST code and its use in computing three-dimensional two-phase flow and heat transfer in a steam generator under steady state operation. The manual is intended primarily to facilitate the application of the code to the analysis of steam generators typical of CANDU nuclear stations. Application to other steam generator designs is also discussed. Details of the assumptions used to formulate the model and to implement the numerical solution are also included

  18. Technical basis for the CANDU steam generator tube fitness-for-service guidelines

    International Nuclear Information System (INIS)

    Kozluk, M.J.; Scarth, D.A.; Graham, D.B.

    2002-01-01

    Active degradation mechanisms in steam generators and preheaters in Canadian CANDU T M generating stations are managed through Steam Generator Programs that incorporate tube inspection, maintenance (cleaning), fitness-for-service assessment, and preventative plugging as part of the overall steam generator management strategy. Steam generator and preheater tubes are inspected in accordance with the CSA Standard CAN/CSA-N285.4-94[l]. When a detected flaw indication does not satisfy the criteria of acceptance by examination, CSA-N285.4-94 permits a fitness-for-service assessment to determine acceptability. In 1999 Ontario Power Generation issued, for trial use, fitness-for-service guidelines for steam generator and preheater tubes in CANDU nuclear power plants. The main objectives of the Fitness-for-Service Guidelines are to provide reasonable assurance that tube structural integrity is maintained, and to provide reasonable assurance that there are adequate margins between estimated accumulated dose and applicable site dose limits. The Fitness-for-Service Guidelines are intended to provide industry-standard acceptance criteria and evaluation procedures for assessing the condition of steam generator and preheater tubes in terms of tube structural integrity, operational leak rate, and consequential leakage during an upset or abnormal event. This paper describes the technical basis for the minimum required safety factors specified in Table IC-1 of the Fitness-for-Service Guidelines and for the flaw models used to develop the flaw stability requirements in the nonmandatory, Appendix C of the Fitness-for-Service Guidelines. (author)

  19. Advanced steam power plant concepts with optimized life-cycle costs: A new approach for maximum customer benefit

    Energy Technology Data Exchange (ETDEWEB)

    Seiter, C.

    1998-07-01

    The use of coal power generation applications is currently enjoying a renaissance. New highly efficient and cost-effective plant concepts together with environmental protection technologies are the main factors in this development. In addition, coal is available on the world market at attractive prices and in many places it is more readily available than gas. At the economical leading edge, standard power plant concepts have been developed to meet the requirements of emerging power markets. These concepts incorporate the high technological state-of-the-art and are designed to achieve lowest life-cycle costs. Low capital cost, fuel costs and operating costs in combination with shortest lead times are the main assets that make these plants attractive especially for IPPs and Developers. Other aspects of these comprehensive concepts include turnkey construction and the willingness to participate in BOO/BOT projects. One of the various examples of such a concept, the 2 x 610-MW Paiton Private Power Project Phase II in Indonesia, is described in this paper. At the technological leading edge, Siemens has always made a major contribution and was pacemaker for new developments in steam power plant technology. Modern coal-fired steam power plants use computer-optimized process and plant design as well as advanced materials, and achieve efficiencies exceeding 45%. One excellent example of this high technology is the world's largest lignite-fired steam power plant Schwarze Pumpe in Germany, which is equipped with two 800 MW Siemens steam turbine generators with supercritical steam parameters. The world's largest 50-Hz single-shaft turbine generator with supercritical steam parameters rated at 1025 MW for the Niederaussem lignite-fired steam power plant in Germany is a further example of the sophisticated Siemens steam turbine technology and sets a new benchmark in this field.

  20. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Demick, L.E.

    2011-01-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  1. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-10-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  2. Integration between direct steam generation in linear solar collectors and supercritical carbon dioxide Brayton power cycles

    OpenAIRE

    Coco Enríquez, Luis; Muñoz Antón, Javier; Martínez-Val Peñalosa, José María

    2015-01-01

    Direct Steam Generation in Parabolic Troughs or Linear Fresnel solar collectors is a technology under development since beginning of nineties (1990's) for replacing thermal oils and molten salts as heat transfer fluids in concentrated solar power plants, avoiding environmental impacts. In parallel to the direct steam generation technology development, supercritical Carbon Dioxide Brayton power cycles are maturing as an alternative to traditional Rankine cycles for increasing net plant efficie...

  3. Steam generator life cycle management: Ontario Power Generation (OPG) experience

    International Nuclear Information System (INIS)

    Maruska, C.C.

    2002-01-01

    A systematic managed process for steam generators has been implemented at Ontario Power Generation (OPG) nuclear stations for the past several years. One of the key requirements of this managed process is to have in place long range Steam Generator Life Cycle Management (SG LCM) plans for each unit. The primary goal of these plans is to maximize the value of the nuclear facility through safe and reliable steam generator operation over the expected life of the units. The SG LCM plans integrate and schedule all steam generator actions such as inspection, operation, maintenance, modifications, repairs, assessments, R and D, performance monitoring and feedback. This paper discusses OPG steam generator life cycle management experience to date, including successes, failures and how lessons learned have been re-applied. The discussion includes relevant examples from each of the operating stations: Pickering B and Darlington. It also includes some of the experience and lessons learned from the activities carried out to refurbish the steam generators at Pickering A after several years in long term lay-up. The paper is structured along the various degradation modes that have been observed to date at these sites, including monitoring and mitigating actions taken and future plans. (author)

  4. Prevention and mitigation of steam generator water hammer events in PWRs

    International Nuclear Information System (INIS)

    Han, J.T.; Anderson, N.

    1983-01-01

    Water hammer in nuclear power plants is an unresolved safety issue under study by the Nuclear Regulatory Commission (NRC). This article summarizes (1) the causes of steam generator water hammer (SGWH) events in pressurized-water reactors (PWRs), (2) various methods used to prevent or mitigate SGWH events, and (3) modifications that have been made at each operating PWR. The NRC staff considers the issue of SGWH in top feedring designs to be technically resolved. This article does not address technical findings relevant to water hammer in preheat-type steam generators

  5. Evaluation of material integrity on electricity generator water steam cycles component (Main Steam Pipe)

    International Nuclear Information System (INIS)

    Sudardjo; Histori; Triyadi, Ari

    1998-01-01

    The evaluation of material integrity on electricity generator component has been done. That component was main steam pipe of Unit II Suralaya Coal Fired Power Plant. evaluation was done by replication technique. The damage was found are two porosity's, from two point samples of six points sample population. Based on cavity evaluation in steels, which proposed by Neubauer and Wedel that porosity's still at class A damage. For class A damage, its means no remedial action would be required until next major scheduled maintenance outage. That porosity's was grouped on isolated cavities and not need ti repair that main steam pipe component less than three year after replication test

  6. Non-polluting steam generators with fluidized-bed furnaces

    Energy Technology Data Exchange (ETDEWEB)

    Brandes, H [Deutsche Babcock A.G., Oberhausen (Germany, F.R.)

    1979-07-01

    The author reports on a 35 MW steam generator with hard coal fluidized-bed furnace a planned 35 MW steam generator with flotation-dirt fluidized-bed furnace, and on planned steam generators for fluidized-bed firing of hard coal up to a steam power of about 200 MW.

  7. CAREM-25 Steam Generator Stability Analysis

    International Nuclear Information System (INIS)

    Rabiti, A.; Delmastro, D.

    2003-01-01

    In this work the stability of a once-through CAREM-25 steam generator is analyzed.A fix nodes numerical model, that allows the modelling of the liquid, two-phase and superheated steam zones, is implemented.This model was checked against a mobile finite elements model under saturated steam conditions at the channel exit and a good agreement was obtained.Finally the stability of a CAREM steam generator is studied and the range of in let restrictions that a assure the system stability is analyzed

  8. Device for achieving pressure balance in the steam generator of a power plant in case of a main-steam pipe or a feedwater pipe break

    International Nuclear Information System (INIS)

    Wietelmann, F.

    1978-01-01

    In order to increase the safety in the steam generator of a power plant in case of a pipe break, the possibility of a pressure balance between the feedwater inlet and the initial steam outlet chambers is allowed for. According to the invention, the partition wall separating these two chambers will exhibit several overflow openings, each of which will be provided with a closure and half of which may be opened to one side only, care having been taken that in case of an accident on occurrence of a certain differential pressure they will always be opened to the low-pressure side. As closures caps, which may be swing out of the way, or rupture diaphragms are mentioned. (UWI) 891 HP [de

  9. Steam generators

    International Nuclear Information System (INIS)

    Hayden, R.L.J.

    1979-01-01

    Steam generators for nuclear reactors are designed so that deposition of solids on the surface of the inlet side of the tubesheet or the inlet header with the consequent danger of corrosion and eventual tube failure is obviated or substantially reduced. (U.K.)

  10. Steam generator corrosion 2007; Dampferzeugerkorrosion 2007

    Energy Technology Data Exchange (ETDEWEB)

    Born, M. (ed.)

    2007-07-01

    Between 8th and 9th November, 2007, SAXONIA Standortentwicklungs- und -verwertungsgesellschaft GmbH (Freiberg, Federal Republic of Germany) performed the 3rd Freiberger discussion conference ''Fireside boiler corrosion''. The topics of the lectures are: (a) Steam generator corrosion - an infinite history (Franz W. Alvert); (b) CFD computations for thermal waste treatment plants - a contribution for the damage recognition and remedy (Klaus Goerner, Thomas Klasen); (c) Experiences with the use of corrosion probes (Siegfried R. Horn, Ferdinand Haider, Barbara Waldmann, Ragnar Warnecke); (d) Use of additives for the limitation of the high temperature chlorine corrosion as an option apart from other measures to the corrosion protection (Wolfgang Spiegel); (e) Current research results and aims of research with respect to chlorine corrosion (Ragnar Warnecke); (f) Systematics of the corrosion phenomena - notes for the enterprise and corrosion protection (Thomas Herzog, Wolfgang Spiegel, Werner Schmidl); (g) Corrosion protection by cladding in steam generators of waste incinerators (Joerg Metschke); (h) Corrosion protection and wear protection by means of thermal spraying in steam generators (Dietmar Bendix); (i) Review of thick film nickelized components as an effective protection against high-temperature corrosion (Johann-Wilhelm Ansey); (j) Fireproof materials for waste incinerators - characteristics and profile of requirement (Johannes Imle); (k) Service life-relevant aspects of fireproof linings in the thermal recycling of waste (Till Osthoevener and Wolfgang Kollenberg); (l) Alternatives to the fireproof material in the heating space (Heino Sinn); (m) Cladding: Inconal 625 contra 686 - Fundamentals / applications in boiler construction and plant construction (Wolfgang Hoffmeister); (n) Thin films as efficient corrosion barriers - thermal spray coating in waste incinerators and biomass firing (Ruediger W. Schuelein, Steffen Hoehne, Friedrich

  11. Improvements to thermal plants for generating energy

    International Nuclear Information System (INIS)

    Pacault, P.H.

    1975-01-01

    Said invention relates to a procedure for superheating steam intended for steam cycled thermal plants of energy production, and particularly nuclear power plants. Said procedure combines two different working modes. According to the first working mode, the live steam is taken from the steam generator, mechanically compressed and the heat is partly transferred to the working fluid. According to the second working mode the heat is taken from an auxiliary fluid heated by an independent thermal source, distinct from the principal thermal source of the plant and this heat is partly transferred to the working fluid. A combination of both working modes enables the superheating of the working fluid to be obtained before it inflows the turbine and/or between two stages of said turbine [fr

  12. Materials choices for the advanced LWR steam generators

    International Nuclear Information System (INIS)

    Paine, J.P.N.; Shoemaker, C.E.; McIlree, A.R.

    1987-01-01

    Current light water reactor (LWR) steam generators have been affected by a variety of corrosion and mechanical damage degradation mechanisms. Included are wear caused by tube vibration, intergranular corrosion, pitting, and thinning or wastage of the steam generator tubing and accelerated corrosion of carbon steel supports (denting). The Electric Power Research Institute (EPRI) and the Steam Generator Owners Groups (I, II) have sponsored laboratory and field studies to provide ameliorative actions for the majority of the damage forms experienced to date. Some of the current corrosion mechanisms are aggravated or caused by unique materials choices or materials interactions. New materials have been proposed and at least partially qualified for use in replacement model steam generators, including an advanced LWR design. In so far as possible, the materials choices for the advanced LWR steam generator avoid the corrosion pitfalls seemingly inherent in the current designs. The EPRI Steam Generator Project staff has recommended materials and design choices for a new steam generator. Based on these recommendations we believe that the advanced LWR steam generators will be much less affected by corrosion and mechanical damage mechanisms than are now experienced

  13. Pressure waves transient occurred in the steam generators feedwater lines of the Atucha-1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Balino, J.L.; Carrica, P.M.; Larreteguy, A.E.

    1993-01-01

    The pressure transient occurred at Atucha I Nuclear Power Plant in March 1990 is simulated. The transient was due to the fast closure of a flow control valve at the steam generators feedwater lines. The system was modelled, including the actuation of the relief valves. The minimum closure time for no actuation of the relief valves and the evolution of the velocity and piezo metric head for different cases were calculated. (author)

  14. Modeling and field studies of fouling in once-through steam generators

    International Nuclear Information System (INIS)

    Thompson, R.; Gaudreau, T.

    1995-01-01

    Efforts of the past 10 years to minimize fouling of the Crystal River-3 once-through steam generators are reviewed. The major focus has been on improving at-temperature pH control in the secondary cycle. Various concentrations of different pH control agents were tested in the field for hundreds of days to determine their effect on steam generator fouling. High concentrations of morpholine (50--100 ppm) in the feedwater were found to apparently produce de-fouling of the steam generators without an associated decrease in feedwater iron concentration as compared to that at lower levels of morpholine. Computer modeling of the pH(t) within the OTSG for the various chemistries tested indicates that the pH can change significantly with elevation within the steam generator by varying the pH control agent or its concentration. It is postulated that these variations in pH may change the surface charge of the tubes, tube support plates, and/or corrosion product particles in solution, to favor either deposition or repulsion of the particles, and thereby producing conditions that either favor fouling or de-fouling of the OTSG. Crystal River-3 experience indicates that corrosion product deposition and release processes inside the steam generator can be chemically manipulated to favor release, and thereby maximize plant performance, and delay or avoid costly hydraulic or chemical cleanings

  15. Studies on Steam Absorption Chillers Performance at a Cogeneration Plant

    Directory of Open Access Journals (Sweden)

    Abd Majid Mohd Amin

    2014-07-01

    Full Text Available Absorption chillers at cogeneration plants generate chilled water using steam supplied by heat recovery steam generators. The chillers can be of either single-effect or double effect configuration and the coefficient of performance (COP depends on the selection made. The COP varies from 0.7 to 1.2 depending on the types of chillers. Single effect chillers normally have COP in the range of 0.68 to 0.79. Double effect chillers COP are higher and can reach 1.2. However due to factors such as inappropriate operations and maintenance practices, COP could drop over a period of time. In this work the performances of double effect steam absorption chillers at a cogeneration plant were studied. The study revealed that during the period of eleven years of operation the COP of the chillers deteriorated from 1.25 to 0.6. Regression models on the operation data indicated that the state of deterioration was projected to persist. Hence, it would be recommended that the chillers be considered for replacement since they had already undergone a series of costly repairs.

  16. Studies of the steam generator degraded tubes behavior on BRUTUS test loop

    Energy Technology Data Exchange (ETDEWEB)

    Chedeau, C.; Rassineux, B. [EDF/DER/MTC, Moret Sur Loing (France); Flesch, B. [EDF/EPN/DMAINT, Paris (France)] [and others

    1997-04-01

    Studies for the evaluation of steam generator tube bundle cracks in PWR power plants are described. Global tests of crack leak rates and numerical calculations of crack opening area are discussed in some detail. A brief overview of thermohydraulic studies and the development of a mechanical probabilistic design code is also given. The COMPROMIS computer code was used in the studies to quantify the influence of in-service inspections and maintenance work on the risk of a steam generator tube rupture.

  17. Design of fault tolerant control system for steam generator using

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Myung Ki; Seo, Mi Ro [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1998-12-31

    A controller and sensor fault tolerant system for a steam generator is designed with fuzzy logic. A structure of the proposed fault tolerant redundant system is composed of a supervisor and two fuzzy weighting modulators. A supervisor alternatively checks a controller and a sensor induced performances to identify which part, a controller or a sensor, is faulty. In order to analyze controller induced performance both an error and a change in error of the system output are chosen as fuzzy variables. The fuzzy logic for a sensor induced performance uses two variables : a deviation between two sensor outputs and its frequency. Fuzzy weighting modulator generates an output signal compensated for faulty input signal. Simulations show that the proposed fault tolerant control scheme for a steam generator regulates well water level by suppressing fault effect of either controllers or sensors. Therefore through duplicating sensors and controllers with the proposed fault tolerant scheme, both a reliability of a steam generator control and sensor system and that of a power plant increase even more. 2 refs., 9 figs., 1 tab. (Author)

  18. RELAP5/MOD2 code modifications to obtain better predictions for the once-through steam generator

    International Nuclear Information System (INIS)

    Blanchat, T.; Hassan, Y.

    1989-01-01

    The steam generator is a major component in pressurized water reactors. Predicting the response of a steam generator during both steady-state and transient conditions is essential in studying the thermal-hydraulic behavior of a nuclear reactor coolant system. Therefore, many analytical and experimental efforts have been performed to investigate the thermal-hydraulic behavior of the steam generators during operational and accident transients. The objective of this study is to predict the behavior of the secondary side of the once-through steam generator (OTSG) using the RELAP5/MOD2 computer code. Steady-state conditions were predicted with the current version of the RELAP5/MOD2 code and compared with experimental plant data. The code predictions consistently underpredict the degree of superheat. A new interface friction model has been implemented in a modified version of RELAP5/MOD2. This modification, along with changes to the flow regime transition criteria and the heat transfer correlations, correctly predicts the degree of superheat and matches plant data

  19. Development and application of the lancing system of delta-60 steam generator-Kori nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Jeong, W. T.; Han, D. Y.; Ahn, N. S.; Jo, B. H.; Hong, Y. W.

    2001-01-01

    A lancing system for removing the deposits on the tube sheet of a nuclear steam generator using high pressure water was developed and applied to Kori Nuclear Power Plant( NPP) Unit 1. As the place where the lancing system is to be installed is relatively high radioactive area, every part consisting the equipment is carefully selected to be radiation resistant. The lancing robot was designed to be water proof to aviod possible malfunction of the lancing robot because of high pressure water. To minimize radiation exposure to operators, the system was designed considering easy installation and maintenance in mind. Water ejection nozzle are designed to have high strength with special material and heat treatment so as to lessen abrasion caused by high pressure ejection. The lancing system showed good performance during the on-site lancing using the system for Delta-60 steam generator of Kori NPP No. 1 in October 2000

  20. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    Energy Technology Data Exchange (ETDEWEB)

    Charcharos, A N; Jones, A G [National Nuclear Corp. Ltd., Cheshire (United Kingdom)

    1984-07-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  1. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    International Nuclear Information System (INIS)

    Charcharos, A.N.; Jones, A.G.

    1984-01-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  2. Expandable antivibration bar for a steam generator

    International Nuclear Information System (INIS)

    Lagally, H.O.

    1987-01-01

    This patent describes a steam generator for a nuclear power plant comprising a shell, a plurality of tubes having a U-shaped configuration arranged in successive columns within the shell. The tubes are adapted to heat feedwater flowing around the outside of the tubes by the flow of hot reactor coolant within the tubes, and antivibration bars any vibrations of the tubes as a result of steam between the columns of tubes. The improvement described here comprises means for varying the thickness of the antivibration bars to fit substantially the actual space between the columns of tubes comprising first and second bars, with at least one bar being movable, and with at least one mating inclined surface between the first and second bars

  3. Cogeneration steam turbine plant for district heating of Berovo (Macedonia)

    International Nuclear Information System (INIS)

    Armenski, Slave; Dimitrov, Konstantin

    2000-01-01

    A plant for combined heat and electric power production, for central heating of the town Berovo (Macedonia) is proposed. The common reason to use a co-generation unit is the energy efficiency and a significant reduction of environmental pollution. A coal dust fraction from B rik' - Berovo coal mine is the main energy resource for cogeneration steam turbine plant. The heat consumption of town Berovo is analyzed and determined. Based on the energy consumption of a whole power plant, e. i. the plant for combined and simultaneous production of power is proposed. All necessary facilities of cogeneration plant is examined and determined. For proposed cogeneration steam turbine power plant for combined heat and electric production it is determined: heat and electric capacity of the plant, annually heat and electrical quantity production and annually coal consumption, the total investment of the plant, the price of both heat and electric energy as well as the pay back period. (Authors)

  4. Parametric Optimization of Biomass Steam-and-Gas Plant

    Directory of Open Access Journals (Sweden)

    V. Sednin

    2013-01-01

    Full Text Available The paper contains a parametric analysis of the simplest scheme of a steam-and gas plant for the conditions required for biomass burning. It has been shown that application of gas-turbine and steam-and-gas plants can significantly exceed an efficiency of steam-power supply units which are used at the present moment. Optimum thermo-dynamical conditions for application of steam-and gas plants with the purpose to burn biomass require new technological solutions in the field of heat-exchange equipment designs.

  5. The casebook of technical presentation on a steam generator

    International Nuclear Information System (INIS)

    1986-05-01

    This casebook consists of seven presentations, which are measures and experience of maintenance of water quality in PWR generator, corrosion in steam generator, safely evaluation by management and closing in steam generator, testing of eddy current in steam generator, unsettled problems of safety in steam generator and maintenance of water quality in PWR generator.

  6. Modelling and exergoeconomic-environmental analysis of combined cycle power generation system using flameless burner for steam generation

    International Nuclear Information System (INIS)

    Hosseini, Seyed Ehsan; Barzegaravval, Hasan; Ganjehkaviri, Abdolsaeid; Wahid, Mazlan Abdul; Mohd Jaafar, M.N.

    2017-01-01

    Highlights: • Using flameless burner as a supplementary firing system after gas turbine is modeled. • Thermodynamic, economic and environmental analyses of this model are performed. • Efficiency of the plant increases about 6% and CO_2 emission decreases up to 5.63% in this design. • Available exergy for work production in both gas cycle and steam cycle increases in this model. - Abstract: To have an optimum condition for the performance of a combined cycle power generation, using supplementary firing system after gas turbine was investigated by various researchers. Since the temperature of turbine exhaust is higher than auto-ignition temperature of the fuel in optimum condition, using flameless burner is modelled in this paper. Flameless burner is installed between gas turbine cycle and Rankine cycle of a combined cycle power plant which one end is connected to the outlet of gas turbine (as primary combustion oxidizer) and the other end opened to the heat recovery steam generator. Then, the exergoeconomic-environmental analysis of the proposed model is evaluated. Results demonstrate that efficiency of the combined cycle power plant increases about 6% and CO_2 emission reduces up to 5.63% in this proposed model. It is found that the variation in the cost is less than 1% due to the fact that a cost constraint is implemented to be equal or lower than the design point cost. Moreover, exergy of flow gases increases in all points except in heat recovery steam generator. Hence, available exergy for work production in both gas cycle and steam cycle will increase in new model.

  7. Accident alarm in steam generators in sodium cooled fast reactor power plants. II

    International Nuclear Information System (INIS)

    Matal, O.; Martoch, J.; Taraba, O.; Hanke, V.

    1978-01-01

    Conditions were simulated in the economizer of a steam generator of water leaks in sodium at a sodium flow of O.62x10 -3 to 1.24x10 -3 m 3 /s and a sodium temperature of 320 to 380 degC by injecting water at a pressure of 6 to 10 MPa which roughly corresponds to conditions in an economizer of an actual steam generator with leaks within the limits of 0.01 to 0.3 g/s. The leak was recorded by acoustic detectors at all observed sodium flow rates and temperatures. The mean signal-to-noise ratio was in all cases greater than 2. At the assumed 25 dB noise level of the real steam generator of micromodular design it may be assumed that using existing acoustic detectors with waveguides a 0.02 g/s leak of water into sodium may be detected. The measurements showed that the technical standard of the equipment is at least as good as that of the flowmeter system of accident monitoring. (J.B.)

  8. Vapor generator steam drum spray heat

    International Nuclear Information System (INIS)

    Fasnacht, F.A. Jr.

    1978-01-01

    A typical embodiment of the invention provides a combination feedwater and cooldown water spray head that is centrally disposed in the lower portion of a nuclear power plant steam drum. This structure not only discharges the feedwater in the hottest part of the steam drum, but also increases the time required for the feedwater to reach the steam drum shell, thereby further increasing the feedwater temperature before it contacts the shell surface, thus reducing thermal shock to the steam drum structure

  9. Steam generation device with heat exchange between a liquid metal coolant and the feedwater

    International Nuclear Information System (INIS)

    Malaval, C.

    1983-01-01

    The invention is particularly applicable to a liquid metal fast breeder reactor plant, the liquid metal being sodium. The steam generation device is described in detail, it allows to get an upper liquid metal level without turbulence and an easier passage for the shock wave towards the steam generator up to the liquid metal level without being laterally reflected back to the intermediate heat exchangers [fr

  10. Development and application of an efficient method for performing modal analysis of steam generator tubes in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Rhee, Huinam [Dept of Mechanical and Aerospace Engineering, Sunchon National University, Sunchon, 540-742 (Korea, Republic of); Boo, Myung-Hwan [Korea Hydro and Nuclear Power Company, Yuseong-Gu, Daejeon 305-343 (Korea, Republic of); Park, Chi-Yong [KEPCO Research Institute, Yuseong-Gu, Daejeon 305-380 (Korea, Republic of); Ryu, Ki-Wahn, E-mail: kwryu@chonbuk.ac.k [Department of Aerospace Engineering, Chonbuk National University, 664-14, Deogjin-Dong, Jeonju 561-756 (Korea, Republic of)

    2010-10-15

    with the FIV analysis program, it gives an amazing benefit, which makes the FIV analysis of all tubes possible within a limited time during the design or maintenance period. Using the developed program, the stability ratio regarding the fluid-elastic instability and the amplitude of vibration resulting from the turbulence flow excitation can be calculated for all tubes according the standard ASME Code, therefore, much more reliable design of the steam generator against the FIV related failures can be achieved. For an operating plant, there is a requirement that every single tube must be quantitatively checked whether wear would be more than 40% in thickness during the next operation period. If yes, the tube must be plugged to prevent severe failure including the tube wall penetration. In order to decide the tube plugging, which leads the plant performance degradation, the wear prediction is required. The wear prediction analysis needs wear data by ultrasonic testing and modal property data of tubes. PIAT-MODE will be a power tool enabling the wear prediction in a limited maintenance period by supplying modal data for all tubes.

  11. Model of reverse steam generator

    International Nuclear Information System (INIS)

    Malasek, V.; Manek, O.; Masek, V.; Riman, J.

    1987-01-01

    The claim of Czechoslovak discovery no. 239272 is a model designed for the verification of the properties of a reverse steam generator during the penetration of water, steam-water mixture or steam into liquid metal flowing inside the heat exchange tubes. The design may primarily be used for steam generators with a built-in inter-tube structure. The model is provided with several injection devices configured in different heat exchange tubes, spaced at different distances along the model axis. The design consists in that between the pressure and the circumferential casings there are transverse partitions and that in one chamber consisting of the circumferential casings, pressure casing and two adjoining partitions there is only one passage of the injection device through the inter-tube space. (Z.M.). 1 fig

  12. Steam generation by combustion of processed waste fats

    Energy Technology Data Exchange (ETDEWEB)

    Pudel, F.; Lengenfeld, P. [OEHMI Forschung und Ingenieurtechnik GmbH, Magdeburg (Germany)

    1993-12-31

    The use of specially processed waste fats as a fuel oil substitute offers, at attractive costs, an environmentally friendly alternative to conventional disposal like refuse incineration or deposition. For that purpose the processed fat is mixed with EL fuel oil and burned in a standard steam generation plant equipped with special accessories. The measured emission values of the combustion processes are very low.

  13. Steam generators regulatory practices and issues in Spain

    International Nuclear Information System (INIS)

    Mendoza, C.; Castelao, C.; Ruiz-Colino, J.; Figueras, J.M.

    1997-01-01

    This paper presents the actual status of Spanish Steam Generator tubes, actions developed by PWR plant owners and submitted to CSN, and regulatory activities related to tube degradation mechanisms analysis; NDT tube inspection techniques; tube, tubesheet and TSPs integrity studies; tube plugging/repair criteria; preventive and corrective measures including whole SGs replacement; tube leak measurement methods and other operational aspects

  14. Predicting steam generator crevice chemistry

    International Nuclear Information System (INIS)

    Burton, G.; Strati, G.

    2006-01-01

    'Full text:' Corrosion of steam cycle components produces insoluble material, mostly iron oxides, that are transported to the steam generator (SG) via the feedwater and deposited on internal surfaces such as the tubes, tube support plates and the tubesheet. The build up of these corrosion products over time can lead to regions of restricted flow with water chemistry that may be significantly different, and potentially more corrosive to SG tube material, than the bulk steam generator water chemistry. The aim of the present work is to predict SG crevice chemistry using experimentation and modelling as part of AECL's overall strategy for steam generator life management. Hideout-return experiments are performed under CANDU steam generator conditions to assess the accumulation of impurities in hideout, and return from, model crevices. The results are used to validate the ChemSolv model that predicts steam generator crevice impurity concentrations, and high temperature pH, based on process parameters (e.g., heat flux, primary side temperature) and blowdown water chemistry. The model has been incorporated into ChemAND, AECL's system health monitoring software for chemistry monitoring, analysis and diagnostics that has been installed at two domestic and one international CANDU station. ChemAND provides the station chemists with the only method to predict SG crevice chemistry. In one recent application, the software has been used to evaluate the crevice chemistry based on the elevated, but balanced, SG bulk water impurity concentrations present during reactor startup, in order to reduce hold times. The present paper will describe recent hideout-return experiments that are used for the validation of the ChemSolv model, station experience using the software, and improvements to predict the crevice electrochemical potential that will permit station staff to ensure that the SG tubes are in the 'safe operating zone' predicted by Lu (AECL). (author)

  15. Future aspects for liquid metal heated steam generators

    International Nuclear Information System (INIS)

    Jansing, W.; Ratzel, W.; Vinzens, K.

    1975-01-01

    The present status of steam generators is shown. The experience gained until now is expressed in form of basic points. The most important design criteria for steam generator systems are outlined. On the basis of these design criteria, two possible steam generator concepts are shown. Costs in relationship to the repair concepts of two modular steam generators (thermal output 156 and 625 MW) and a pool design of 625 MW are compared. (author)

  16. Future aspects for liquid metal heated steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Jansing, W; Ratzel, W; Vinzens, K

    1975-07-01

    The present status of steam generators is shown. The experience gained until now is expressed in form of basic points. The most important design criteria for steam generator systems are outlined. On the basis of these design criteria, two possible steam generator concepts are shown. Costs in relationship to the repair concepts of two modular steam generators (thermal output 156 and 625 MW) and a pool design of 625 MW are compared. (author)

  17. Comments on US LMFBR steam generator base technology

    International Nuclear Information System (INIS)

    Simmons, W.R.

    1984-01-01

    The development of steam generators for the LMFBR was recognized from the onset by the AEC, now DOE, as a difficult, challenging, and high-priority task. The highly reactive nature of sodium with water/steam requires that the sodium-water/steam boundaries of LMFBR steam generators possess a degree of leak-tightness reliability not normally attempted on a commercial scale. In addition, the LMFBR steam generator is subjected to high fluid temperatures and severe thermal transients. These requirements place great demand on materials, fabrication processes, and inspection methods; and even greater demands on the designer to provide steam generators that can meet these demanding requirements, be fabricated without unreasonable shop requirements, and tolerate off-normal effects

  18. Steam Generator Inspection Planning Expert System

    International Nuclear Information System (INIS)

    Rzasa, P.

    1987-01-01

    Applying Artificial Intelligence technology to steam generator non-destructive examination (NDE) can help identify high risk locations in steam generators and can aid in preparing technical specification compliant eddy current test (ECT) programs. A steam Generator Inspection Planning Expert System has been developed which can assist NDE or utility personnel in planning ECT programs. This system represents and processes its information using an object oriented declarative knowledge base, heuristic rules, and symbolic information processing, three artificial intelligence based techniques incorporated in the design. The output of the system is an automated generation of ECT programs. Used in an outage inspection, this system significantly reduced planning time

  19. Steam generator and circulator model for the HELAP code

    International Nuclear Information System (INIS)

    Ludewig, H.

    1975-07-01

    An outline is presented of the work carried out in the 1974 fiscal year on the GCFBR safety research project consisting of the development of improved steam generator and circulator (steam turbine driven helium compressor) models which will eventually be inserted in the HELAP (1) code. Furthermore, a code was developed which will be used to generate steady state input for the primary and secondary sides of the steam generator. The following conclusions and suggestions for further work are made: (1) The steam-generator and circulator model are consistent with the volume and junction layout used in HELAP, (2) with minor changes these models, when incorporated in HELAP, could be used to simulate a direct cycle plant, (3) an explicit control valve model is still to be developed and would be very desirable to control the flow to the turbine during a transient (initially this flow will be controlled by using the existing check valve model); (4) the friction factor in the laminar flow region is computed inaccurately, this might cause significant errors in loss-of-flow accidents; and (5) it is felt that HELAP will still use a large amount of computer time and will thus be limited to design basis accidents without scram or loss of flow transients with and without scram. Finally it may also be used as a test bed for the development of prototype component models which would be incorporated in a more sophisticated system code, developed specifically for GCFBR's

  20. An effect of downcomer feedwater fraction on steam generator performance with an axial flow economizer

    International Nuclear Information System (INIS)

    Jung, Byung Ryul; Park, Hu Shin; Chung, Duk Muk; Baik, Se Jin

    2000-01-01

    The effects of feedwater flow fraction introduced into the downcomer region have been evaluated in terms of steam generator performance based on the same steam generator thermal output for the Korea Standard Nuclear Power Plant (KSNP) steam generator. The KSNP steam generator design has an integral axial flow economizer which is designed such that most of the feedwater is introduced through the economizer region and only a portion of feedwater through the downcomer region. The feedwater flow introduced into the downcomer region is not normally controlled during the power operation. However, the actual feedwater fraction into the downcomer region may differ from the design flow depending on the as-built system and component characteristics. Investigated in this paper were the downcomer feedwater flow effects on the steam pressure, circulation ratio, internal void fraction and velocity distribution in the tube bundle region at the steady state operation using SAFE and ATHOS3 codes. The results show that the steam pressure increases and the resultant total feedwater flow increases with reducing the downcomer feedwater flow fraction for the same steam generator thermal output. The slight off-design condition of downcomer feedwater flow fraction renders no significant effect on the steam generator performance such as circulation ratios, steam qualities, void fractions and internal velocity distributions. The evaluation shows that the slight off-design downcomer feedwater flow fraction deviation up to ± 5% is acceptable for the steam generator performance

  1. Hydrogen-oxygen steam generator applications for increasing the efficiency, maneuverability and reliability of power production

    Science.gov (United States)

    Schastlivtsev, A. I.; Borzenko, V. I.

    2017-11-01

    The comparative feasibility study of the energy storage technologies showed good applicability of hydrogen-oxygen steam generators (HOSG) based energy storage systems with large-scale hydrogen production. The developed scheme solutions for the use of HOSGs for thermal power (TPP) and nuclear power plants (NPP), and the feasibility analysis that have been carried out have shown that their use makes it possible to increase the maneuverability of steam turbines and provide backup power supply in the event of failure of the main steam generating equipment. The main design solutions for the integration of hydrogen-oxygen steam generators into the main power equipment of TPPs and NPPs, as well as their optimal operation modes, are considered.

  2. Study of scratch-induced stress corrosion cracking for steam generator tubes and scratch control

    International Nuclear Information System (INIS)

    Meng, F.; Xu, X.; Liu, X.; Wang, J.

    2014-01-01

    This paper introduces field cases for scratch-induced stress corrosion cracking (SISCC) of steam generator tubes in PWR and current studies in laboratories. According to analysis result of broke tubes, scratches caused intergranular stress corrosion cracking (IGSCC) with outburst. The effect of microstructure for nickel-base alloys, residual stresses caused by scratching process and water chemistry on SISCC and possible mechanism of SISCC are discussed. The result shows that scratch-induced microstructure evolution contributes to SISCC significantly. The causes of scratches during steam generator tubing manufacturing and installation process are stated and improved reliability with scratch control is highlighted for steam generator tubes in newly built nuclear power plants. (author)

  3. Study of scratch-induced stress corrosion cracking for steam generator tubes and scratch control

    Energy Technology Data Exchange (ETDEWEB)

    Meng, F.; Xu, X.; Liu, X. [Shanghai Nuclear Engineering Research and Design Institute, Shanghai (China); Wang, J. [Chinese Academy of Sciences, Institute of Metal Research, Shenyang (China)

    2014-07-01

    This paper introduces field cases for scratch-induced stress corrosion cracking (SISCC) of steam generator tubes in PWR and current studies in laboratories. According to analysis result of broke tubes, scratches caused intergranular stress corrosion cracking (IGSCC) with outburst. The effect of microstructure for nickel-base alloys, residual stresses caused by scratching process and water chemistry on SISCC and possible mechanism of SISCC are discussed. The result shows that scratch-induced microstructure evolution contributes to SISCC significantly. The causes of scratches during steam generator tubing manufacturing and installation process are stated and improved reliability with scratch control is highlighted for steam generator tubes in newly built nuclear power plants. (author)

  4. Determination of moisture content in steams and variation in moisture content with operating boiler level by analyzing sodium content in steam generator water and steam condensate of a nuclear power plant using ion chromatographic technique

    International Nuclear Information System (INIS)

    Pal, P.K.; Bohra, R.C.

    2015-01-01

    Dry steam with moisture content less than <1% is the stringent requirements in a steam generator for good health of the turbine. In order to confirm the same, determination of sodium is done in steam generator water and steam condensate using Flame photometer in ppm level and ion chromatograph in ppb level. Depending on the carry over of sodium in steam along with the water droplet (moisture), the moisture content in steam was calculated and was found to be < 1% which is requirements of the system. The paper described the salient features of a PHWR, principle of Ion Chromatography, chemistry parameters of Steam Generators and calculation of moisture content in steam on the basis of sodium analysis. (author)

  5. Kawasaki steam power plant of Tokyo Electric Power Co. and an example of geothermal power generation

    Energy Technology Data Exchange (ETDEWEB)

    1961-01-01

    The first part of this discussion is devoted to a description of the Kawasaki steam power plant, installed by Tokyo Electric Co. to supply electricity to the Keihin industrial area. The output is 700 MW and it possesses a thermal efficiency of 36.9%. The plant is operated automatically by remote control. The latter section describes the status of a geothermal power station in Hakone. It outlines the steam distribution piping, the steam itself, the turbine and vapor/water separation equipment. With regard to technical problems, it is suggested that old wells having weak pressure can be restored by self-cleaning and that further improvement can be brought about by dynamiting the base of the borehole.

  6. Assesment of integrity of WWER steam generator tubes

    International Nuclear Information System (INIS)

    Splichal, K.; Brozova, A.; Zdarek, J.

    1992-01-01

    Full text: The leak rates measurement project was held to give experimental data enabling the Czechoslovak Atomic Agency Inspection to decree the change in the Technical Specification allowable limit of steam generator activity release on secondary side. The WWER types of nuclear power plants in Czechoslovakia have horizontal steam generators. The tubes studying in frame of the project belong to steam generator WWER- 440 type, the diameter of tube is 16 mm, the wall thickness 1.4 mm. The subject of the project was the measurement of service leak rates of typical in service cracks. Secondary side stress corrosion cracks were determined as the typical crack created in service condition. These cracks were prepared in tubes artificially by exposition in chloride environment accompanied by an internal stress. The experimental device consisted of a pressure vessel connected with pressure water loop, a cooling vessel for leakage medium and a measuring vessel. The leak rates were determined as a slope of plots the leakage volume - time. Inside the pressure vessel the steam generator operation environment was simulated. It means: primary side of tube 12.5 MPa, Z90 deg. C, secondary side -4.6MPa, 250 deg. C, water service quality. We observed reduce of leak rate in course of time in each experiment. We suppose the tubes were stopped up by deposits formed in manufacturing of crack and in experiment. Our opinion has been proved by fractography. Project results in recommendation for in service leak rate limit based on safety factors with respect to critical crack lengths and for determination of tube plugging criteria. (author)

  7. Hydrogen and acoustic detection in steam generators of Super Phenix power plant

    International Nuclear Information System (INIS)

    Kong, N.; Le Bris, A.; Berthier, P.

    1986-05-01

    During the isothermal tests of Super-Phenix, two types of measurements were made on the steam generators with regard to the detection of water leaks into the sodium: - the first measurements enabled us to determine the characteristics (sensitivity, response time) of the hydrogen detectors that are already operational for the filling with water and the power operation of the steam generators. They also provided the basis for developing a prototype system for detecting very small water leaks (microleak phase). The other measurements concern the qualification tests of acoustic detectors which have been fitted for the first time to a major industrial installation. The results obtained are very satisfactory but final validation of the acoustic method will only occur after the full-power tests [fr

  8. Operating experiences with 1 MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Sano, A; Kanamori, A; Tsuchiya, T

    1975-07-01

    1 MW steam generator, which was planned as the first stage of steam generator development in Power Reactor and Nuclear Fuel Corp. (PNC) in Japan, is a single-unit, once-through, integrated shell and tube type with multi-helical coil tubes. It was completed in Oarai Engineering Center of PNC in March of 1971, and the various performance tests were carried out up to April, 1972. After the dismantle of the steam generator for structural inspection and material test, it was restored with some improvements. In this second 1 MW steam generator, small leak occurred twice during normal operation. After repairing the failure, the same kind of performance tests as the first steam generator were conducted in order to verify the thermal insulation effect of argon gas in downcomer zone from March to June, 1974. In this paper the above operating experiences were presented including the outline of some performance test results. (author)

  9. Maintenance and repair of LMFBR steam generators

    International Nuclear Information System (INIS)

    Verriere, P.; Alanche, J.; Minguet, J.L.

    1984-06-01

    After some general remarks on the French fast neutron system, this paper presents the state of the program for the construction of fast reactor in France. Then, the general design of Super Phenix 1 steam generator components is outlined and, the in-service monitoring systems and protective devices with which they are equiped are briefly described. The methods used, in the event of leakage, for leak location, steam generator inspection, steam generator repair and putting the affected loop back into service, are discussed. There are two main lines of research, relating respectively to the means of water leak detection in sodium and the inspection arrangements that will be used either periodically, or following a sodium-water reaction. Finally, after a brief description of the steam generator, this paper describes the four incidents (leaks) that occurred on the Phenix steam generator in the course of 1982 and 1983, and the subsequent repair operations

  10. Gas-steam turbine plant for cogenerative process at 'Toplifikacija' - Skopje (Joint-Stock Co. for district heating - Macedonia)

    International Nuclear Information System (INIS)

    Cvetkovski, Andrijan

    2003-01-01

    The gas-steam power plant for combined heat and electric power production at A.D. 'Toplifikacija' Skopje - TO 'Zapad' is analyzed and determined. The analyzed plant is consisted of gas turbine, heat recovery steam generator (HRSG) and condensate steam turbine with controlled steam extraction. It operates on natural gas as a main fuel source. The heating of the water for the district heating is dine in the heat exchanger, with // heat of controlled extraction from condensate turbine. The advantages of the both binary plant and centralized co generative production compared with the individual are analyzed. The natural gas consumption of for both specific heating and electrical capacity in join production as well as fuel savings compared to the separate production of the same quantity of energy is also analyzed. (Original)

  11. Response of the steam generator VVER 1000 to a steam line break

    International Nuclear Information System (INIS)

    Novotny, J.; Novotny, J. Jr.

    2003-01-01

    Dynamic effects of a steam line break in the weld of the steam pipe and the steam collector on the steam generator system are analyzed. Modelling of a steam line break may concern two cases. The steam line without a restraint and the steam line protected by a whip restraint with viscous elements applied at the postulated break cross-section. The second case is considered. Programme SYSTUS offers a special element the stiffness and viscous damping coefficients of which may be defined as dependent on the relative displacement and velocity of its nodes respectively. A circumferential crack is simulated by a sudden decrease of longitudinal and lateral stiffness coefficients of these special SYSTUS elements to zero. The computation has shown that one can simulate the pipe to behave like completely broken during a time interval of 0,0001 s or less. These elements are used to model the whip restraint with viscous elements and viscous dampers of the GERB type as well. In the case of a whip restraint model the stiffness coefficient-displacement relation and damping coefficient - velocity relation are chosen to fit the given characteristics of the restraint. The special SYSTUS elements are used to constitute Maxwell elements modelling the elasto-plastic and viscous properties of the GERB dampers applied to the steam generator. It has been ascertained that a steam line break at the postulated weld crack between the steam pipe and the steam generator collector cannot endanger the integrity of the system even in a case of the absence of a whip restraint effect. (author)

  12. Steam Generator tube integrity -- US Nuclear Regulatory Commission perspective

    International Nuclear Information System (INIS)

    Murphy, E.L.; Sullivan, E.J.

    1997-01-01

    In the US, the current regulatory framework was developed in the 1970s when general wall thinning was the dominant degradation mechanism; and, as a result of changes in the forms of degradation being observed and improvements in inspection and tube repair technology, the regulatory framework needs to be updated. Operating experience indicates that the current U.S. requirements should be more stringent in some areas, while in other areas they are overly conservative. To date, this situation has been dealt with on a plant-specific basis in the US. However, the NRC staff is now developing a proposed steam generator rule as a generic framework for ensuring that the steam generator tubes are capable of performing their intended safety functions. This paper discusses the current U.S. regulatory framework for assuring steam generator (SG) tube integrity, the need to update this regulatory framework, the objectives of the new proposed rule, the US Nuclear Regulatory Commission (NRC) regulatory guide (RG) that will accompany the rule, how risk considerations affect the development of the new rule, and some outstanding issues relating to the rule that the NRC is still dealing with

  13. An improved steam generator model for the SASSYS code

    International Nuclear Information System (INIS)

    Pizzica, P.A.

    1989-01-01

    A new steam generator model has been developed for the SASSYS computer code, which analyzes accident conditions in a liquid metal cooled fast reactor. It has been incorporated into the new SASSYS balance-of-plant model but it can also function on a stand-alone basis. The steam generator can be used in a once-through mode, or a variant of the model can be used as a separate evaporator and a superheater with recirculation loop. The new model provides for an exact steady-state solution as well as the transient calculation. There was a need for a faster and more flexible model than the old steam generator model. The new model provides for more detail with its multi-mode treatment as opposed to the previous model's one node per region approach. Numerical instability problems which were the result of cell-centered spatial differencing, fully explicit time differencing, and the moving boundary treatment of the boiling crisis point in the boiling region have been reduced. This leads to an increase in speed as larger time steps can now be taken. The new model is an improvement in many respects. 2 refs., 3 figs

  14. Materials performance in operating PWR steam generators

    International Nuclear Information System (INIS)

    Weeks, J.R.

    1975-01-01

    The Inconel-600 tubing in operating PWR steam generators has developed leaks due to intergranular stress corrosion cracking or a general wastage attack, originating from the secondary side of the tubing. Corrosion has been limited to those areas of the steam generators where limited coolant circulation and high heat flux have caused impurities to concentrate. Wastage or pitting attack has always been associated with local concentration of sodium hydrogen phosphates, whereas stress corrosion has been associated with local concentration of sodium or potassium hydroxides. The only instance of stress corrosion originating from the primary side occurred on cold-worked tubing when hydrogen was not added to getter oxygen, and LiOH was not added to raise the pH of the primary coolant. All PWR manufacturers are now recommending that the phosphate treatment of the secondary coolant be abandoned in favor of an all-volatile treatment. Experience in operating plants has shown, however, that removal of phosphate-rich sludge deposits is difficult, and that further wastage and/or intergranular stress corrosion may develop; the residual sodium phosphates gradually convert by reaction with corrosion product hydroxides to sodium hydroxide, which remains concentrated in the limited flow areas. Improvements in circulation patterns have been achieved by inserting flow baffles in some PWR steam generators. Inservice monitoring by eddy current techniques is useful for detecting corrosion-induced defects in the tubing, but irreproducibility in field examinations can lead to uncertainties interpreting the results. (U.S.)

  15. Technology of turbine plant operating with wet steam

    International Nuclear Information System (INIS)

    1989-01-01

    The technology of turbine plant operating with wet steam is a subject of continuing interest and importance, notably in view of the widespread use of wet steam cycles in nuclear power plants and the recent developments of advanced low pressure blading for both conventional and wet steam turbines. The nature of water formation in expanding steam has an important influence on the efficiency of turbine blading and on the integrity and safe operating life of blading and associated turbine and plant components. The subjects covered in this book include research, flow analysis and measurement, development and design of turbines and ancillary plant, selection of materials of construction, manufacturing methods and operating experience. (author)

  16. Steam generator development in France for the Super Phenix project; Generateurs de vapeur developpes en France pour Super Phenix

    Energy Technology Data Exchange (ETDEWEB)

    Robin, M G

    1975-07-01

    'Steam Generator Development for Super Phenix Project'. The development program of steam generators studied by Fives-Cail Babcock and Stein Industrie Companies, jointly with CEA end EDF, for the Super Phenix 1200 MWe Fast Breeder Power Plant, is presented. The main characteristics of both sodium heated steam generators are emphasized and experimental studies related to their key features are reported. (author)

  17. Power Plants, Steam and Gas Turbines WebQuest

    Science.gov (United States)

    Ulloa, Carlos; Rey, Guillermo D.; Sánchez, Ángel; Cancela, Ángeles

    2012-01-01

    A WebQuest is an Internet-based and inquiry-oriented learning activity. The aim of this work is to outline the creation of a WebQuest entitled "Power Generation Plants: Steam and Gas Turbines." This is one of the topics covered in the course "Thermodynamics and Heat Transfer," which is offered in the second year of Mechanical…

  18. US PWR steam generator management: An overview

    International Nuclear Information System (INIS)

    Welty, C.S. Jr.

    1997-01-01

    This paper provides an overview on the status of steam generator management activities in US PWRs, and includes: (1) an overview of the impact of steam generator problems; (2) a brief discussion of historical damage trends and the current damage mechanism of most concern; (3) a discussion of the elements of open-quotes steam generator managementclose quotes; and (4) a description of the approach being followed to implement a degradation-specific protocol for tubing inspection and repair. This paper was prepared in conjunction with another paper presented during the Plenary Session of this Conference, open-quotes Steam Generator Degradation: Current Mitigation Strategies for Controlling Corrosionclose quotes, and is provided as a supplement to that material

  19. Draining down of a nuclear steam generating system

    International Nuclear Information System (INIS)

    Jawor, J.C.

    1987-01-01

    The method is described of draining down contained reactor-coolant water from the inverted vertical U-tubes of a vertical-type steam generator in which the upper, inverted U-shaped ends of the tubes are closed and the lower ends thereof are open. The steam generator is part of a nuclear powered steam generating system wherein the reactor coolant water is normally circulated from and back into the reactor via a loop comprising the steam generator and inlet and outlet conduits connected to the lower end of the steam generator. The method comprises continuously introducing a gas which is inert to the system and which is under pressure above atmospheric pressure into at least one of the downwardly facing open ends of each of the U-tubes from below the tube sheet in which the open ends of the U-tubes are mounted adjacent the lower end of the steam generator, while permitting the water to flow out from the open ends of the U-tubes

  20. An homogeneous model of steam generator to simulate operational transiento and accidents in PWR nuclear power plants

    International Nuclear Information System (INIS)

    Souza, A.L. de.

    1981-07-01

    GEVAP - A digital computer code was developed to simulate the thermodynamic transient behaviour of steam generators. The steam generator is divided in heating sections. In each section, the conservation equations of mass and energy are integrated numerically, using a predictor-corrector method. As good reslts where obtained, as compared to transients simulated using more detainled codes, it is concluded that GEVAP can be included as the steam generator module of a more complete systems simulation code for PWR's. (E.G.) [pt

  1. Loss of feed flow, steam generator tube rupture and steam line break thermohydraulic experiments

    International Nuclear Information System (INIS)

    Mendler, O.J.; Takeuchi, K.; Young, M.Y.

    1986-10-01

    The Westinghouse Model Boiler No. 2 (MB-2) steam generator test model at the Engineering Test Facility in Tampa, Florida, was reinstrumented and modified for performing a series of tests simulating steam generator accident transients. The transients simulated were: loss of feed flow, steam generator tube rupture, and steam line break events. This document presents a description of (1) the model boiler and the associated test facility, (2) the tests performed, and (3) the analyses of the test results

  2. Loss of feed flow, steam generator tube rupture and steam line break thermohydraulic experiments

    Energy Technology Data Exchange (ETDEWEB)

    Mendler, O J; Takeuchi, K; Young, M Y

    1986-10-01

    The Westinghouse Model Boiler No. 2 (MB-2) steam generator test model at the Engineering Test Facility in Tampa, Florida, was reinstrumented and modified for performing a series of tests simulating steam generator accident transients. The transients simulated were: loss of feed flow, steam generator tube rupture, and steam line break events. This document presents a description of (1) the model boiler and the associated test facility, (2) the tests performed, and (3) the analyses of the test results.

  3. Polymeric dispersants for control of steam generator fouling

    International Nuclear Information System (INIS)

    Balakrishnan, P.V.; Klimas, S.J.; Lepine, L.; Turner, C.W.

    1999-05-01

    Fouling of steam generators by corrosion products from the feedtrain leads to loss of heat-transfer efficiency, disturbances in thermalhydraulics, and potential corrosion problems resulting from the development of sites for localized accumulation of aggressive chemicals. This report summarizes studies of the use of polymeric dispersants for the control of fouling, which were conducted at the Chalk River Laboratories. High-temperature settling studies on magnetite suspensions were performed to screen available generic dispersants, and the dispersants were ranked in terms of their dispersion efficiency; polyacrylic acid (PAA) and the phosphonate, HEDP, were ranked as the most efficient. Polyacrylic acid was considered more suitable than HEDP for nuclear steam generators, and more emphasis was given to the former in these studies. The dispersants had no effect on the particle deposition rates under single-phase forced-convective flow, but did reduce the deposition rates under flow-boiling conditions. The extent to which the deposition rates were reduced increased in proportion to the dispersant concentration. Preliminary corrosion tests indicated that pitting or general corrosion of steam generator tube materials in the presence of PAA was negligible. Corrosion of carbon steel, although higher in a magnetite-packed crevice under heat flux than in bulk water, was lower in the presence of PAA than in its absence. Some impurities (e.g., sulphate, sodium) were observed in commercially available PAA products at small, though significant concentrations, making these products unacceptable for use in nuclear plants. However, the PAA could be purified by ion exchange. Preliminary experiments, to assess the thermal stability of PAA at steam generator operating temperature, showed the polymer to break down in deaerated solutions and under argon cover to give hydrogen and carbon dioxide as the two major products in the gas phase and variable concentrations of acetate and formate

  4. Steam generator materials constraints in UK design gas-cooled reactors

    International Nuclear Information System (INIS)

    James, D.W.

    1988-01-01

    A widely reported problem with Magnox-type reactors was the oxidation of carbon steel components in gas circuits and steam generators. The effects of temperature, pressure, gas composition and steel composition on oxidation kinetics have been determined, thus allowing the probabilities of failure of critical components to be predicted for a given set of operating conditions. This risk analysis, coupled with regular inspection of reactor and boiler internals, has allowed continued operation of all U.K. Magnox plant. The Advanced Gas Cooled Reactor (AGR) is a direct development of the Magnox design. The first four AGRs commenced operation in 1976, at Hinkley Point 'B' and at Hunterston 'B'. All known materials problems with the steam generators have been diagnosed and solved by the development of appropriate operational strategies, together with minor plant modifications. Materials constraints no longer impose any restrictions to full load performance from the steam generators throughout the predicted life of the plant. Problems discussed in detail are: 1. oxidation of the 9 Cr - 1 Mo superheater. 2. Stress corrosion of the austenitic superheater. 3. Creep of the transition joints between the 9 Cr - 1 Mo and austenitic sections. With the 9 Cr - 1 Mo oxidation maximum temperature restriction virtually removed and creep constraints properly quantified, boiler operation in now favourably placed. Stress corrosion research has allowed the risk of tube failure to be related to time, temperature, stress and chemistry. As a result, the rigorous 'no wetting' policy has been relaxed for the normally high quality AGR feedwater, and the superheat margin has been reduced to 23 deg. C. This has increased the size of the operating window and reduced the number of expensive, and potentially harmful, plant trips. (author)

  5. Acoustic tool for leak inspections in steam generator divider plates

    International Nuclear Information System (INIS)

    Kowalewski, J.; Maak, P.; Colbert, M.

    1997-01-01

    Cross flow leakage through divider plates in the primary head of steam generators, may be a contributor to RIHT rise which can have a negative effect on the operation of a plant. A method to provide quick and reliable inspection of divider plate leakage can be very useful in helping make timely and effective maintenance decisions. A novel acoustic tool for performing inspections in drained steam generators during shutdowns has been developed by OH Technologies and successfully demonstrated in a field application. The technique, referred as ALIS (acoustic leak inspection system), performs a scan of the divider plate face and presents a graphic image of the leakage paths and an estimate of the total leakage area. (author)

  6. Improvement of ISI techniques by multi-frequency eddy current testing method for steam generator tube in PWR plant

    International Nuclear Information System (INIS)

    Endo, Takashi; Kamimura, Takeo; Nishihara, Masatoshi; Araki, Yasuo; Fukui, Shigetaka.

    1982-05-01

    Eddy current flaw detection techniques are applied to the in-service inspection (ISI) of steam generator tubes in pressurized water reactors (PWR) plant. To improve the reliability and operating efficiency of the plants, efforts are being made to develop eddy current testing methods of various kinds. Multi-frequency eddy current testing method, one of new method, has recently been applied to actual heat exchanger tubes, contributing to the improvement of the detectability and signal evaluation of the ISI. The outline of multi-frequency eddy current testing method and its effects on the improvement of flaw detecting and signal evaluation accuracy are described. (author)

  7. Two-phase flow field simulation of horizontal steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Rabiee, Ataollah; Kamalinia, Amir Hossein; Hadad, Kamal [School of Mechanical Engineering, Shiraz University, Shiraz (Iran, Islamic Republic of)

    2017-02-15

    The analysis of steam generators as an interface between primary and secondary circuits in light water nuclear power plants is crucial in terms of safety and design issues. VVER-1000 nuclear power plants use horizontal steam generators which demand a detailed thermal hydraulics investigation in order to predict their behavior during normal and transient operational conditions. Two phase flow field simulation on adjacent tube bundles is important in obtaining logical numerical results. However, the complexity of the tube bundles, due to geometry and arrangement, makes it complicated. Employment of porous media is suggested to simplify numerical modeling. This study presents the use of porous media to simulate the tube bundles within a general-purpose computational fluid dynamics code. Solved governing equations are generalized phase continuity, momentum, and energy equations. Boundary conditions, as one of the main challenges in this numerical analysis, are optimized. The model has been verified and tuned by simple two-dimensional geometry. It is shown that the obtained vapor volume fraction near the cold and hot collectors predict the experimental results more accurately than in previous studies.

  8. Public Opinion shifts to the favour of nuclear energy due to steam generator transport

    International Nuclear Information System (INIS)

    Lengar, I.; Nemec, T.

    2000-01-01

    In late August and early September of 1999, nuclear energy topics occupied a central place in the Slovenian media because of the transport of two new steam generators to the Krsko nuclear power plant, and also due to the protest action of an Austrian Green peace group. Before these events, the public opinion in Slovenia was not in favour or nuclear energy ;and Green peace had a good reputation. In September it has lost much credibility because of their clumsy :action of protest, and in just one month this caused a shift of public opinion in Slovenia towards support of Slovenian's only nuclear power plant. The Green peace protest action occurred during the transport of the two new steam generators to Krsko. By replacement of the old steam generators the operation of the Krsko NPP will be extended until 2023. The transport envoy travelled during the first half of September '99 across a considerable part of Slovene territory, passing by the capital of Ljubljana. (authors)

  9. Inspection and repair of steam generator tubing with a robot

    International Nuclear Information System (INIS)

    Boehm, H.H.; Foerch, H.

    1985-01-01

    During inspection and repair of steam generator tubing, radiation exposure to personnel is an unrequested endowment. To combat this intrinsic handicap, a robot has been designed for deployment in all operations inside the steam generator water chamber. This measure drastically reduces entering time and also improves inspection capabilities with regard to the accuracy and reproduction of the desired tube address. The inherent flexibility of the robot allows for performing various inspection and repair techniques: eddy-current testing of tubing; ultrasonic testing of tubing; visual examination of tube ends; profilometry measurements; tube plugging; plug removal; tube extraction; sleeving of tubes; tube end repair; chemical cleaning; and thermal treatment. Plant experience has highlighted the following features of the robot: 1) short installation and demounting periods; 2) installation independent of manhole location; 3) installation possible from outside the steam generator; 4) only one relocation required to address all the tube positions; 5) fast and highly accurate positioning; 6) operational surveillance not required; and 7) drastic reduction of radiation exposure to personnel during repair work

  10. Mitigation of caustic stress corrosion cracking of steam generator tube materials by blowdown -a case study

    International Nuclear Information System (INIS)

    Dutta, Anu; Patwegar, I.A.; Chaki, S.K.; Venkat Raj, V.

    2000-01-01

    The vertical U-tube steam generators are among the most important equipment in nuclear power plants as they form the vital link between the reactor and the turbogenerator. Over ∼ 35 years of operating experience of water cooled reactor has demonstrated that steam generator tubes are susceptible to various forms of degradation. This degradation leads to failure and outages of the power plant. A majority of these failures have been attributed to concentrated alkali attacks in the low flow areas such as crevices in the tube to tube sheet joints, baffle plate location and the areas of sludge deposits. Free hydroxides can be produced by improper maintenance of phosphate chemical control in the secondary side of the steam generators and also by the thermal decomposition of impurities present in the condenser cooling water which may leak into the feed water through the condenser tubes. The free hydroxides concentrate in the low flow areas. This buildup of free hydroxide in combination with residual stress leads to caustic stress corrosion cracking. In order to mitigate caustic stress corrosion cracking of Inconel 600 tubes, the trend is to avoid phosphate dosing. Instead All Volatile Treatment (AVT) for secondary water is used backed by full flow condensate polishing. Sodium hydroxide concentration is now being considered as the basis for steam generator blowdown. A methodology has been established for determining the blowdown requirement in order to mitigate caustic stress corrosion cracking in the secondary side of the vertical U-tube natural circulation steam generator. A case study has been carried out for zero solid treatment (AVT coupled with full flow condensate polishing plant) water chemistry. Only continuous blowdown schemes have been studied based on maximum caustic concentration permissible in the secondary side of the steam generator. The methodology established can also be used for deciding concentration of any other impurities

  11. Parametric study for horizontal steam generator modelling

    Energy Technology Data Exchange (ETDEWEB)

    Ovtcharova, I. [Energoproekt, Sofia (Bulgaria)

    1995-12-31

    In the presentation some of the calculated results of horizontal steam generator PGV - 440 modelling with RELAP5/Mod3 are described. Two nodalization schemes have been used with different components in the steam dome. A study of parameters variation on the steam generator work and calculated results is made in cases with separator and branch.

  12. Parametric study for horizontal steam generator modelling

    Energy Technology Data Exchange (ETDEWEB)

    Ovtcharova, I [Energoproekt, Sofia (Bulgaria)

    1996-12-31

    In the presentation some of the calculated results of horizontal steam generator PGV - 440 modelling with RELAP5/Mod3 are described. Two nodalization schemes have been used with different components in the steam dome. A study of parameters variation on the steam generator work and calculated results is made in cases with separator and branch.

  13. Design features of Advanced Power Reactor (APR) 1400 steam generator

    International Nuclear Information System (INIS)

    Park, Tae-Jung; Park, Jun-Soo; Kim, Moo-Yong

    2004-01-01

    Advanced Power Reactor 1400 (APR 1400) which is to achieve the improvement of the safety and economical efficiency has been developed by Korea Hydro and Nuclear Power Co., Ltd. (KHNP) with the support from industries and research institutes. The steam generator for APR 1400 is an evolutionary type from System 80 + , which is the recirculating U-tube heat exchanger with integral economizer. Compared to the System 80 + steam generator, it is focused on the improved design features, operating and design conditions of APR 1400 steam generator. Especially, from the operation experience of Korean Standard Nuclear Power Plant (KSNP) steam generator, the lessons-learned measures are incorporated to prevent the tube wear caused by flow-induced vibration (FIV). The concepts for the preventive design features against FIV are categorized to two fields; flow distribution and dynamic response characteristics. From the standpoint of flow distribution characteristics, the egg-crate flow distribution plate (EFDP) is installed to prevent the local excessive flow loaded on the most susceptible tube to wear. The parametric study is performed to select the optimum design with the efficient mitigation of local excessive flow. ATHOS3 Mod-01 is used and partly modified to analyze the flow field of the APR 1400 steam generator. In addition, the upper tube bundle support is designed to eliminate the presence of tube with a low natural frequency. Based on the improved upper tube bundle support, the modal analysis is performed and compared with that of System 80 + . Using the results of flow distribution and modal analysis, the two mechanisms of flow-induced vibration are investigated; fluid-elastic instability (FEI) and random turbulence excitation (RTE). (authors)

  14. Steam generator arrangement

    International Nuclear Information System (INIS)

    Ssinegurski, E.

    1981-01-01

    A steam flow path arrangement for covering the walls of the rear gas pass of a steam generator is disclosed. The entire flow passes down the sidewalls with a minor portion then passing up through the rear wall to a superheater inlet header at an intermediate elevation. The major portion of the flow passes up the front wall and through hanger tubes to a roof header. From there the major portion passes across the roof and down the rear wall to the superheater inlet header at the intermediate elevation

  15. CRBRP steam-generator design evolution

    International Nuclear Information System (INIS)

    Geiger, W.R.; Gillett, J.E.; Lagally, H.O.

    1983-01-01

    The overall design of the CRBRP Steam Generator is briefly discussed. Two areas of particular concern are highlighted and considerations leading to the final design are detailed. Differential thermal expansion between the shell and the steam tubes is accommodated by the tubes flexing in the curved section of the shell. Support of the tubes by the internals structure is essential to permit free movement and minimize tube wear. Special spacer plate attachment and tube hole geometry promote unimpeded axial movement of the tubes by allowing individual tubes to rotate laterally and by providing lateral movement of the spacer plates relative to the adjacent support structure. The water/steam heads of the CRBRP Steam Generator are spherical heads welded to the lower and upper tubesheets. They were chosen principally because they provide a positively sealed system and result in more favorable stresses in the tubesheets when compared to mechanically attached steamheads

  16. Modelling horizontal steam generator with ATHLET. Verification of different nodalization schemes and implementation of verified constitutive equations

    Energy Technology Data Exchange (ETDEWEB)

    Beliaev, J.; Trunov, N.; Tschekin, I. [OKB Gidropress (Russian Federation); Luther, W. [GRS Garching (Germany); Spolitak, S. [RNC-KI (Russian Federation)

    1995-12-31

    Currently the ATHLET code is widely applied for modelling of several Power Plants of WWER type with horizontal steam generators. A main drawback of all these applications is the insufficient verification of the models for the steam generator. This paper presents the nodalization schemes for the secondary side of the steam generator, the results of stationary calculations, and preliminary comparisons to experimental data. The consideration of circulation in the water inventory of the secondary side is proved to be necessary. (orig.). 3 refs.

  17. Modelling horizontal steam generator with ATHLET. Verification of different nodalization schemes and implementation of verified constitutive equations

    Energy Technology Data Exchange (ETDEWEB)

    Beliaev, J; Trunov, N; Tschekin, I [OKB Gidropress (Russian Federation); Luther, W [GRS Garching (Germany); Spolitak, S [RNC-KI (Russian Federation)

    1996-12-31

    Currently the ATHLET code is widely applied for modelling of several Power Plants of WWER type with horizontal steam generators. A main drawback of all these applications is the insufficient verification of the models for the steam generator. This paper presents the nodalization schemes for the secondary side of the steam generator, the results of stationary calculations, and preliminary comparisons to experimental data. The consideration of circulation in the water inventory of the secondary side is proved to be necessary. (orig.). 3 refs.

  18. Severe transient tests on operation steam generators: Analysis of the fluid structure dynamic thermal interaction

    International Nuclear Information System (INIS)

    Billon, F.; David, J.; Procaccia, H.

    1983-01-01

    The operating efficiency of steam generators (S.G.s) and their structural integrity depend on the design configurations of the feedwater spray within the S.G., and on the operating procedure. To check the merit of some design modifications, and to verify the fluid-structure interaction with a view to preserve the S.G.s integrity during severe operating transients, a special instrumentation that admits the determination of the instantaneous thermal hydraulic characteristics of the flow in the secondary water and the S.G. tube sheet, has been installed by EDF on one steam generator of Tricastin unit 1 power plant. In parallel, FRAMATOME has developped a computer code, TEMPTRON, that allows the calculations of the thermal loads and the consequent stresses in the most sollicited zones of the steam generator during transient operation of the plant. This code divides the S.G. into three parts: - the first concerns the S.G.s region above the downcomer, zone where the mixing between hot water and cold feedwater occurs, - the second is the downcomer itself which is divided into n segments, - the third concerns the tube sheet zone which is also divided into n segments. The most severe transient test performed is the auxiliary cold feedwater injection into the steam generator during a hot standby of the plant: two levels of flow rate have been realised: 55 and 110 m 3 /h of 42 0 C feedwater. The tests have shown that if the cold feedwater injection occurs when the steam generator water level is below feedwater ring, the lowest fluid temperature reached at tube sheet inlet is about 230 0 C. (orig.)

  19. Vibration Analysis for Steam Dryer of APR1400 Steam Generator

    Energy Technology Data Exchange (ETDEWEB)

    Han, Sung-heum; Ko, Doyoung [KHNP CRI, Daejeon (Korea, Republic of); Cho, Minki [Doosan Heavy Industry, Changwon (Korea, Republic of)

    2016-10-15

    This paper is related to comprehensive vibration assessment program for APR1400 steam generator internals. According to U.S. Nuclear Regulatory Commission, Regulatory Guide 1.20 (Rev.3, March 2007), we conducted vibration analysis for a steam dryer as the second steam separator of steam generator internals. The vibration analysis was performed at the 100 % power operating condition as the normal operation condition. The random hydraulic loads were calculated by the computational fluid dynamics and the structural responses were predicted by power spectral density analysis for the probabilistic method. In order to meet the recently revised U.S. NRC RG 1.20 Rev.3, the CVAP against the potential adverse flow effects in APR1400 SG internals should be performed. This study conducted the vibration response analysis for the SG steam dryer as the second moisture separator at the 100% power condition, and evaluated the structural integrity. The predicted alternating stress intensities were evaluated to have more than 17.78 times fatigue margin compared to the endurance limit.

  20. A Study on the Profile Change Measurement of Steam Generator Tubes with Tube Expansion Methods

    International Nuclear Information System (INIS)

    Kim, Young Kyu; Song Myung Ho; Choi, Myung Sik

    2011-01-01

    Steam generator tubes for nuclear power plants contain the local shape transitions on their inner or outer surface such as dent, bulge, over-expansion, eccentricity, deflection, and so on by the application of physical force during the tube manufacturing and steam generator assembling and by the sludge (that is, corrosion products) produced during the plant operation. The structural integrity of tubes will be degraded by generating the corrosive crack at that location. The profilometry using the traditional bobbin probes which are currently applied for measuring the profile change of tubes gives us basic information such as axial locations and average magnitudes of deformations. However, the three-dimensional quantitative evaluation on circumferential locations, distributional angle, and size of deformations will have to be conducted to understand the effects of residual stresses increased by local deformations on corrosive cracking of tubes. Steam generator tubes of Korean standard nuclear power plants expanded within their tube-sheets by the explosive expansion method and suffered from corrosive cracks in the early stage of power operation. Thus, local deformations of steam generator tubes at the top of tube-sheet were measured with an advanced rotating probe and a laser profiling system for the two cases where the tubes expanded by the explosive expansion method and hydraulic expansion. Also, the trends of eccentricity, deflection, and over-expansion of tubes were evaluated. The advanced eddy current profilometry was confirmed to provide accurate information of local deformations compared with laser profilometry

  1. Tests and analysis on steam generator tube failure propagation

    International Nuclear Information System (INIS)

    Tanabe, Hiromi

    1990-01-01

    The understanding of leak enlargement and failure propagation behavior is essential to select a design basis leak (DBL) of LMFBR steam generators. Therefore, various series of experiments, such as self-enlargement tests, target wastage tests, failure propagation tests were conducted in a wide range of leak using test facilities of SWAT at PNC/OEC. Especially, in the large leak tests, potential of overheating failure was investigated under a prototypical steam cooling condition inside target tubes. In the small leak, the difference of wastage resistivity was clarified among several tube materials such as 9-chrome steels. In regard to an analytical approach, a computer code LEAP (Leak Enlargement and Propagation) was developed on the basis of all of these experimental results. The code was used to validate the previously selected DBL of the prototype reactor, Monju, steam generator. This approach proved to be successful in spite of somewhat over-conservatism in the analysis. Moreover, LEAP clarified the effectiveness of a rapid steam dump and an enhanced leak detection system. The code improvement toward a realistic analysis is desired, however, to lessen the DBL for a future large plant and then the re-evaluation of the experimental data such as the size of secondary failure is under way. (author). 4 refs, 8 figs, 1 tab

  2. The AREVA customized chemical cleaning C3-concept as part of the steam generator asset management

    International Nuclear Information System (INIS)

    Weiss, Steffen; Drexler, Andreas

    2012-09-01

    In pressurized water reactors corrosion products and impurities are transported into the steam generators by feed water. Corrosion products and impurities are accumulated in the SGs as deposits and scales on the tubes, the tube support structures and the tube sheet. Depending on the location, the composition and the morphology such deposits may negatively affect the performance of the steam generators by reducing the thermal performance, changing the flow patterns and producing localized corrosion promoting conditions. Accordingly removal of deposits or deposit minimization strategies are an essential part of the asset management program of the steam generators in Nuclear Power Plants. It is evident that such a program is plant specific, depending on the individual condition prevailing. Parameters to be considered are for example: - Steam generator and balance of plant design; - Secondary side water chemistry treatment; - Deposit amount and constitution; - Deposit distribution in the steam generator; - Existing or expected corrosion problems. After evaluation of the steam generator condition a strategy for deposit minimization has to be developed. Depending on the individual situation such strategies may span from curative full scale cleanings which are capable of removing the entire sludge inventory in the range of several 1000 kg per SG to preventive cleanings that remove only a portion of the deposits in the range of several 100 kg per SG. But also other goals depending on the specific plant situation, like tube sheet sludge piles or hard scale removal, may be considered. Beside the chemical cleaning process itself also the integration of the process into the outage schedule and considerations about its impact on other maintenance activities is of great importance. It is obvious that all these requirements cannot be met easily by a standardized cleaning method, thus a customisable chemical cleaning technology is required. Based on its comprehensive experience

  3. Evolution of design of steam generator for sodium cooled reactors

    International Nuclear Information System (INIS)

    Chetal, S.C.; Vaidyanathan

    1997-01-01

    The first sodium cooled reactor was the experimental breeder reactor (EBR-I) in usa which was commissioned in 1951 and was incidentally the first nuclear reactor to generate electrical energy. This was followed by fast breeder reactors in USSR, UK, france, USA, japan, germany and India. The use of sodium as a coolant is due to its low moderation which helps in breeding fissile fuel from fertile materials and also its high heat transfer coefficient at comparatively low velocities. The good heat transfer properties introduce thermal stresses when there are rapid changes in the sodium temperatures. Also sodium has a chemical affinity with air and water. The steam generators for sodium cooled reactors have to allow for these novel conditions and in addition, unlike other components. Choices have to be made whether it is a recirculation type as in most fossil plants or an once through unit, the power rating, shape of the tube (straight, helical, U-tube), materials (Ferritic or austenitic), with free level of sodium or not, sodium on tube side or shell side and so on. With higher pressures and steam temperatures reheating steam after partial expansion in the turbine becomes essential as in conventional turbines. For this purpose the choice of reheating fluid viz sodium or live main steam has to be made. This paper traces the evolution of steam generator designs in the different sodium cooled reactors (chronologically) and the operation experience. 16 figs., 1 tab

  4. French steam generator

    International Nuclear Information System (INIS)

    Remond, A.

    1986-01-01

    After recalling the potential damage mode of tubes of steam generator, the author recalls the safety criteria used in France. The improvements and the process of damage prejudice and reparation for tubular bundle are presented [fr

  5. MPC-based auto-tuned PID controller for the steam generator water level

    International Nuclear Information System (INIS)

    Na, Man Gyun

    2001-01-01

    In this work, proportional-integral-derivative (PID) control gains are automatically tuned by using a model predictive control (MPC) method. The MPC has received much attention as a powerful tool for the control of industrial process systems. An MPC-based PID controller can be derived from the second order linear model of a process. The steam generator is usually described by the well-known 4 th order linear model which consists of the mass capacity, reverse dynamics and mechanical oscillations terms. But the important terms in this linear model are the mass capacity and reverse dynamics terms, both of which can be described by a 2 nd order linear system. The proposed auto-tuned PID controller was applied to a linear model of steam generators. The parameters of a linear model for steam generators are very different according to the power levels. The proposed controller showed good performance for the water level deviation and sudden steam flow disturbances that are typical in the existing power plants by changing only the input-weighting factor according to the power level

  6. Method for steam generator water level measurement

    International Nuclear Information System (INIS)

    Srinivasan, J.S.

    1991-01-01

    This paper describes a nuclear power plant, a method of controlling the steam generator water level, wherein the steam generator has an upper level tap corresponding to an upper level, a lower level, a riser positioned between the lower and upper taps, and level sensor means for indicating water level between a first range limit and a second range limit, the sensor means being connected to at least the lower tap. It comprises: calculating a measure of velocity head at about the lower level tap; calculating a measure of full water level as the upper level less the measure of velocity head; calibrating the level sensor means to provide an output at the first limit corresponding to an input thereto representative of the measure of full level; calculating a high level setpoint equal to the level of the riser less a bias amount which is a function of the position of the riser relative to the span between the taps; and controlling the water level when the sensor means indicates that the high level setpoint has been reached

  7. Evaluating Steam Generator Tubing Corrosion through Shutdown Nickel and Cobalt Releases

    International Nuclear Information System (INIS)

    Marks, Chuck; Little, Mike; Krull, Peter; Dennis Hussey; Kenny Epperson

    2012-09-01

    During power operation in PWRs, steam generator tubing corrodes. In PWRs with nickel alloy steam generator tubing this leads to the release of nickel into the coolant. While not structurally significant, this process leads to corrosion product deposition on the fuel surfaces that can threaten fuel integrity, provide a site for boron precipitation, and, through activation and subsequent release, lead to increased out-of-core radiation fields. During shutdown, decreases in temperature and pH and an increase in the oxidation potential lead to dissolution of some corrosion products from the core. This work evaluated the masses of corrosion products released during shutdown as a proxy for steam generator tubing corrosion rates. The masses were evaluated for trends with time (e.g., the number of cycles) and for the influence of design and operating features such as tubing manufacturer, plant design (e.g., three loop versus four loop), and operating chemistry program. This project utilized the EPRI PWR Chemistry Monitoring and Assessment database. Data from over 20 units, many over several cycles, were assessed. The focus was on corrosion product release from Alloy 690TT tubing and all data were from units that had replaced steam generators. Data were analyzed using models developed from corrosion rate test data reported in the literature with a heavy reliance on data from the EDF BOREAL testing. The most striking result of this analysis was a clear division between plants that exhibited corrosion with a falling rate (i.e., following an exponential decay as has been observed, for example, in the BOREAL testing) and those that showed a constant corrosion rate, sustained for many outages. This difference appears to be most closely correlated with the manufacturer of the tubing. Within the two distinct plant groups (decaying corrosion rate and constant corrosion rate), details of the trends were evaluated for correlation with zinc addition history, plant type, and operating

  8. Research program plan: steam generators

    International Nuclear Information System (INIS)

    Muscara, J.; Serpan, C.Z. Jr.

    1985-07-01

    This document presents a plan for research in Steam Generators to be performed by the Materials Engineering Branch, MEBR, Division of Engineering Technology, (EDET), Office of Nuclear Regulatory Research. It is one of four plans describing the ongoing research in the corresponding areas of MEBR activity. In order to answer the questions posed, the Steam Generator Program has been organized with the three elements of non-destructive examination; mechanical integrity testing; and corrosion, cleaning and decontamination

  9. Water box for steam generator

    International Nuclear Information System (INIS)

    Lecomte, Robert; Viaud, Michel.

    1975-01-01

    This invention relates to a water box for connecting an assembly composed of a vertical steam generator and a vertical pump to the vessel of the nuclear reactor, the assembly forming the primary cooling system of a pressurised water reactor. This invention makes it easy to dismantle the pump on the water box without significant loss of water in the primary cooling system of the reactor and particularly without it being necessary to drain the water contained in the steam generator beforehand. It makes it possible to shorten the time required for dismantling the primary pump in order to service or repair it and makes dismantling safer in that the dismantling does not involve draining the steam generator and therefore the critical storage of a large amount of cooling water that has been in contact with the fuel assemblies of the nuclear reactor core [fr

  10. Environmental codes of practice for steam electric power generation

    International Nuclear Information System (INIS)

    1985-03-01

    The Design Phase Code is one of a series of documents being developed for the steam electric power generation industry. This industry includes fossil-fuelled stations (gas, oil and coal-fired boilers), and nuclear-powered stations (CANDU heavy water reactors). In this document, environmental concerns associated with water-related and solid waste activities of steam electric plants are discussed. Design recommendations are presented that will minimize the detrimental environmental effects of once-through cooling water systems, of wastewaters discharged to surface waters and groundwaters, and of solid waste disposal sites. Recommendations are also presented for the design of water-related monitoring systems and programs. Cost estimates associated with the implementation of these recommendations are included. These technical guides for new or modified steam electric stations are the result to consultation with a federal-provincial-industry task force

  11. Test and evaluation of Alco/BLH prototype sodium-heated steam generator. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kaplan, C.J.; Auge, L.J.; Cho, S.M.; Hanna, R.W.; Prevost, J.R.; Steger, N.A.; Wagner, R.K.

    1971-01-31

    A 30-Mwt prototype sodium-to-sodium intermediate heat exchanger and a 30-Mwt prototype sodium-heated steam generator were tested in combined operation in its Sodium Components Test Installation. This report contains the results of test and evaluation of the steam generator. During plant performance tests, performance degradation was observed, which resulted in the initiation of a diagnostic test series. This test series revealed that under certain operating conditions, the thermohydraulic characteristic of the steam generator changed either suddenly or gradually, resulting in overall performance degradation. A structural failure, requiring retirement of the unit, occurred before the diagnostic test series and analytical support effort were completed. This report describes the thermohydraulic and structural performance, including the structural failures, and related evaluation analyses of the Alco/BLH prototype steam generator performed prior to termination of the test and evaluation program. In addition, the report presents a post-test examination plan to obtain data that could possibly explain the cause of performance anomalies and structural failures experienced during testing.

  12. Three-dimensional modeling of nuclear steam generator

    International Nuclear Information System (INIS)

    Bogdan, Z.; Afgan, N.

    1985-01-01

    In this paper mathematical model for steady-state simulation of thermodynamic and hydraulic behaviour of U-tube nuclear steam generator is described. The model predicts three-dimensional distribution of temperatures, pressures, steam qualities and velocities in the steam generator secondary loop. In this analysis homogeneous two phase flow model is utilized. Foe purpose of the computer implementation of the mathematical model, a special flow distribution code NUGEN was developed. Calculations are performed with the input data and geometrical characteristics related to the D-4 (westinghouse) model of U-tube nuclear steam generator built in Krsko, operating under 100% load conditions. Results are shown in diagrams giving spatial distribution of pertinent variables in the secondary loop. (author)

  13. The current status of research and development concerning steam generator acoustic leak detection for the demonstration FBR plant

    International Nuclear Information System (INIS)

    Higuchi, Masahisa

    1990-01-01

    The Japan Atomic Power Co. (JAPC) started the research and development into Acoustic Leak Detection for the Demonstration FBR (D-FBR) plant in 1989. Acoustic Leak Detection is expected as a water leak detection system in the Steam Generator for the first D-FBR plant. JAPC is presently analyzing data on Acoustic Leak Detection in order to form some basic concepts and basic specifications about leak detection. Both low frequency types and high frequency types are selected as candidates for Acoustic Leak Detection. After a review of both types, either one will be selected for the D-FBT plant. A detailed Research and Development plan on Acoustic Leak Detection, which should be carried out prior to starting the construction of the D-FBR plant, is under review. (author). 3 figs, 2 tabs

  14. A two-fluid two-phase model for thermal-hydraulic analysis of a U-tube steam generator

    International Nuclear Information System (INIS)

    Hung, Huanjen; Chieng, Chingchang; Pei, Baushei; Wang, Songfeng

    1993-01-01

    The Advanced Thermal-Hydraulic Analysis Code for Nuclear Steam Generators (ATHANS) was developed on the basis of the THERMIT-UTSG computer code for U-tube steam generators. The main features of the ATHANS model are as follows: (a) the equations are solved in cylindrical coordinates, (b) the number and the arrangement of the control volumes inside the steam generator can be chosen by the user, (c) the virtual mass effect is incorporated, and (d) the conjugate gradient squared method is employed to accelerate and improve the numerical convergence. The performance of the model is successfully validated by comparison with the test data from a Westinghouse model F steam generator at the Maanshan nuclear power plant. Better agreement with the test data can be obtained by a finer grid system using a cylindrical coordinate system and the virtual mass effect. With these advanced features, ATHANS provides the basic framework for further studies on the problems of steam generators, such as analyses of secondary-side corrosion and tube ruptures

  15. CFD Analysis of Random Turbulent Flow Load in Steam Generator of APR1400 Under Normal Operation Condition

    International Nuclear Information System (INIS)

    Lim, Sang Gyu; You, Sung Chang; Kim, Han Gon

    2011-01-01

    Regulatory guide 1.20 revision 3 of the Nuclear Regulatory Committee (NRC) modifies guidance for vibration assessments of reactor internals and steam generator internals. The new guidance requires applicants to provide a preliminary analysis and evaluation of the design and performance of a facility, including the safety margins of during normal operation and transient conditions anticipated during the life of the facility. Especially, revision 3 require rigorous assessments of adverse flow effects in the steam dryer cased by flow-excited acoustic and structural resonances such as the abnormality from power-uprated BWR cases. For two nearly identical nuclear power plants, the steam system of one BWR plant experienced failure of steam dryers and the main steam system components when steam flow was increased by 16 percent for extended power uprate (EPU). The mechanisms of those failures have revealed that a small adverse flow changing from the prototype condition induced severe flow-excited acoustic and structural resonances, leading to structural failures. In accordance with the historical background, therefore, potential adverse flow effects should be evaluated rigorously for steam generator internals in both BWR and Pressurized Water Reactor (PWR). The Advanced Power Reactor 1400 (APR1400), an evolutionary light water reactor, increased the power by 7.7 percent from the design of the 'Valid Prototype', System80+. Thus, reliable evaluations of potential adverse flow effects on the steam generator of APR1400 are necessary according to the regulatory guide. This paper is part of the computational fluid dynamics (CFD) analysis results for evaluation of the adverse flow effect for the steam generator internals of APR1400, including a series of sensitivity analyses to enhance the reliability of CFD analysis and an estimation the effect of flow loads on the internals of the steam generator under normal operation conditions

  16. Use of reinforced soil wall to support steam generator transfer

    International Nuclear Information System (INIS)

    Davie, J.R.; Wang, J.T.; Gladstone, R.A.

    1991-01-01

    Consumers Power Company had the two steam generators at its Palisades Nuclear Plant in Michigan replaced in November 1990. This replacement was accomplished through a 26-foot wide by 28-foot high opening cut into the wall of the containment building, about 45 feet above the original ground surface. Because this ground surface was at an approximately 3-H:1-V slope, leveling was required before replacement in order to provide access for the steam generators and adequate support for the heavy-duty gantry crane system used to transfer the generators. A 25-foot high reinforced soil wall was constructed to achieve the level surface. This paper describes the design and construction of the heavily loaded reinforced soil wall, including ground improvement measures required to obtain adequate wall stability. The performance of the wall under test loading will also be presented and discussed

  17. Steam generator tube rupture effects on a LOCA

    International Nuclear Information System (INIS)

    LaChance, J.L.

    1979-01-01

    A problem currently experienced in commercial operating pressurized water reactors (PWR) in the United States is the degradation of steam generator tubes. Safety questions have arisen concerning the effect of these degraded tubes rupturing during a postulated loss-of-coolant accident (LOCA). To determine the effect of a small number of tube ruptures on the behavior of a large PWR during a postulated LOCA, a series of computer simulations was performed. The primary concern of the study was to determine whether a small number (10 or less of steam generator tubes rupturing at the beginning surface temperatures. Additional reflood analyses were performed to determine the system behavior when from 10 to 60 tubes rupture at the beginning of core reflood. The FLOOD4 code was selected as being the most applicable code for use in this study after an extensive analysis of the capabilities of existing codes to perform simulations of a LOCA with concurrent steam generator tube ruptures. The results of the study indicate that the rupturing of 10 or less steam generator tubes in any of the steam generators during a 200% cold leg break will not result in a significant increase in the peak cladding temperature. However, because of the vaporization of the steam generator secondary water in the primary side of the steam generator, a significant increase in the core pressure occurs which retards the reflooding process

  18. Methods for preventing steam generator failure or degradation

    International Nuclear Information System (INIS)

    Green, S.J.

    1986-01-01

    PWR steam generators have suffered from a variety of degradation phenomena. This paper identifies the corrosion-related defects and their probable causes and suggests approaches to correct and prevent corrosive activity. In the attempt to solve the degradation problems, research programs have concentrated on modifying materials, stresses, and the chemical environment in both new and operating steam generators. The following corrosion-related defects have been studied: tube wastage, denting, primary side (ID) intergranular stress corrosion cracking (IGSCC), OD-initiated intergranular attack (IGA), pitting, and corrosion fatigue. Plants affected by wastage have greatly reduced their problem by adopting an all volatile treatment (AVT). In the case of denting, a less aggressive chemical environment is recommended. Primary side IGSCC responds to temperature reduction, stress relief, and material improvements, while flushing and boric acid addition minimizes OD-initiated IGA. It has further been shown that pitting can be minimized by sludge lancing and by reducing impurity ingress. (author)

  19. Ecotaxes and their impact in the cost of steam and electric energy generated by a steam turbine system

    International Nuclear Information System (INIS)

    Montero, Gisela

    2006-01-01

    Ecotaxes allow the internalization of costs that are considered externalities associated with polluting industrial process emissions to the atmosphere. In this paper, ecotaxes internalize polluting emissions negative impacts that are added to electricity and steam generated costs of a steam turbine and heat recovery systems from a utilities refinery plant. Steam costs were calculated by means of an exergy analysis tool and Aspen Plus simulation models. Ecotaxes were calculated for specific substances emitted in the refinery flue gases, based on a toxicity and pollution scale. Ecotaxes were generated from a model that includes damages produced to biotic and abiotic resources and considers the relative position of those substances in a toxicity and pollution scale. These ecotaxes were internalized by an exergoeconomic analysis resulting in an increase in the cost per kWh produced. This kind of ecotax is not applied in Mexico. The values of ecotaxes used in the cost determination are referred to the values currently applied by some European countries to nitrogen oxides emissions. (author)

  20. Mathematical modeling of control system for the experimental steam generator

    Science.gov (United States)

    Podlasek, Szymon; Lalik, Krzysztof; Filipowicz, Mariusz; Sornek, Krzysztof; Kupski, Robert; Raś, Anita

    2016-03-01

    A steam generator is an essential unit of each cogeneration system using steam machines. Currently one of the cheapest ways of the steam generation can be application of old steam generators came from army surplus store. They have relatively simple construction and in case of not so exploited units - quite good general conditions, and functionality of mechanical components. By contrast, electrical components and control systems (mostly based on relay automatics) are definitely obsolete. It is not possible to use such units with cooperation of steam bus or with steam engines. In particular, there is no possibility for automatically adjustment of the pressure and the temperature of the generated steam supplying steam engines. Such adjustment is necessary in case of variation of a generator load. The paper is devoted to description of improvement of an exemplary unit together with construction of the measurement-control system based on a PLC. The aim was to enable for communication between the steam generator and controllers of the steam bus and steam engines in order to construction of a complete, fully autonomic and maintenance-free microcogeneration system.

  1. Seed-a distributed data base architecture for global management of steam-generator inspection data

    International Nuclear Information System (INIS)

    Soon Ju Kang; Yu Rak Choi; Hee Gon Woo; Seong Su Choi

    1996-01-01

    This paper deals with a data management system - called SEED (Steam-generator Eddy-current Expert Database) for global handling of SG (steam generator) tube inspection data in nuclear power plants. The SEED integrates all stages in SG tube inspection process and supports all data such as raw eddy current data, inspection history data, SG tube information, etc. SEED implemented under client/server computing architecture for supporting LAN/WAN based graphical user interface facilities using WWW programming tools. (author)

  2. Risk assessment of severe accident-induced steam generator tube rupture

    International Nuclear Information System (INIS)

    1998-03-01

    This report describes the basis, results, and related risk implications of an analysis performed by an ad hoc working group of the U.S. Nuclear Regulatory Commission (NRC) to assess the containment bypass potential attributable to steam generator tube rupture (SGTR) induced by severe accident conditions. The SGTR Severe Accident Working Group, comprised of staff members from the NRC's Offices of Nuclear Reactor Regulation (NRR) and Nuclear Regulatory Research (RES), undertook the analysis beginning in December 1995 to support a proposed steam generator integrity rule. The work drew upon previous risk and thermal-hydraulic analyses of core damage sequences, with a focus on the Surry plant as a representative example. This analysis yielded new results, however, derived by predicting thermal-hydraulic conditions of selected severe accident scenarios using the SCDAP/RELAP5 computer code, flawed tube failure modeling, and tube failure probability estimates. These results, in terms of containment bypass probability, form the basis for the findings presented in this report. The representative calculation using Surry plant data indicates that some existing plants could be vulnerable to containment bypass resulting from tube failure during severe accidents. To specifically identify the population of plants that may pose a significant bypass risk would require more definitive analysis considering uncertainties in some assumptions and plant- and design-specific variables. 46 refs., 62 figs., 37 tabs

  3. Modelling studies of horizontal steam generator PGV-1000 with Cathare

    Energy Technology Data Exchange (ETDEWEB)

    Karppinen, I. [VTT Energy, Espoo (Finland)

    1995-12-31

    To perform thermal-hydraulic studies applied to nuclear power plants equipped with VVER, a program of qualification and assessment of the CATHARE computer code is in progress at the Institute of Protection and Nuclear Safety (IPSN). In this paper studies of modelling horizontal steam generator of VVER-1000 with the CATHARE computer code are presented. Steady state results are compared with measured data from the fifth unit of Novovoronezh nuclear power plant. (orig.). 10 refs.

  4. Modelling studies of horizontal steam generator PGV-1000 with Cathare

    Energy Technology Data Exchange (ETDEWEB)

    Karppinen, I [VTT Energy, Espoo (Finland)

    1996-12-31

    To perform thermal-hydraulic studies applied to nuclear power plants equipped with VVER, a program of qualification and assessment of the CATHARE computer code is in progress at the Institute of Protection and Nuclear Safety (IPSN). In this paper studies of modelling horizontal steam generator of VVER-1000 with the CATHARE computer code are presented. Steady state results are compared with measured data from the fifth unit of Novovoronezh nuclear power plant. (orig.). 10 refs.

  5. PWR steam generator chemical cleaning, Phase I. Final report

    International Nuclear Information System (INIS)

    Rothstein, S.

    1978-07-01

    United Nuclear Industries (UNI) entered into a subcontract with Consolidated Edison Company of New York (Con Ed) on August 8, 1977, for the purpose of developing methods to chemically clean the secondary side tube to tube support crevices of the steam generators of Indian Point Nos. 1 and 2 PWR plants. This document represents the first reporting on activities performed for Phase I of this effort. Specifically, this report contains the results of a literature search performed by UNI for the purpose of determining state-of-the-art chemical solvents and methods for decontaminating nuclear reactor steam generators. The results of the search sought to accomplish two objectives: (1) identify solvents beyond those proposed at present by UNI and Con Ed for the test program, and (2) confirm the appropriateness of solvents and methods of decontamination currently in use by UNI

  6. Extended layup of steam generators during a refurbishment outage

    International Nuclear Information System (INIS)

    Marks, C.R.; Little, M.D.; Slade, J.; Gendron, T.

    2009-01-01

    In May 2008, Point Lepreau Generating Station (PLGS), owned and operated by New Brunswick Power Nuclear (NBPN), entered an extended refurbishment outage initially expected to last approximately 18 months. NBPN had the two inter-related goals with respect to layup of the steam generators during this period: equipment preservation and inspection interval modification. The steam generators were to be preserved such that there was no loss of operating life due to corrosion of either the tubing (Alloy 800NG) or other internal components (with carbon steel being the limiting material with respect to corrosion). Additionally, NBPN desired that the time in layup not count as operating time in setting the schedule for future inspections. That is, a key goal of the steam generator layup is that the future inspection interval be based on operating time, not calendar time. The NBPN approach consists of the following four steps: A review of industry operating experience with long outages (including both PWRs and PHWRs); The development of technically based layup strategies and procedures; A mid-outage review of the implementation of the layup strategies and procedures; and A post-outage review to determine if the actual conditions in the steam generators will support modification of the inspection interval. This paper discusses the results of the first three of these steps. At this time, the plant is still in the refurbishment outage. Throughout the outage evaluation process, the following issues have been the main focus of the reviews: The potential for degradation (pitting and cracking) of steam generator tubes; The potential for general corrosion of carbon and low alloy steel internals; Oxidation of deposits (which could subsequently lead to oxidizing conditions during operation, possibly leading to tube degradation). This paper discusses the industry operating experience reviewed, the pre-outage assessments, and the mid-outage assessments. Current outage planning places the

  7. CANDU steam generator aging management: Some perspectives after 20 years in-service experience

    International Nuclear Information System (INIS)

    Tapping, R.I.; Nickerson, J.; Subash, N.; Roy, S.

    2002-01-01

    Full text: AECL, in collaboration with a number of utilities, has carried out several steam generator (SG) condition assessments with the objective to assure reliable remaining life and to provide a prognosis for extended life capability. With in-service dates ranging from 1972 to 1983, and a variety of tubing materials, the condition assessments have identified a wide range of challenges for an effective SG aging management program. All of these SG condition assessments were carried out in conjunction with overall plant condition assessments, performed either by AECL, the utility, or both in partnership. Significant factors found to limit SG life and to challenge aging management, are identification of critical degradation mechanisms for each of the key structural materials, evaluation and determination of the life limiting sub-components, the need to develop improved inspection technology and plans that track the life limiting components, the need to create and use databases of plant information (in particular that from commissioning) and the development of recommendations for future operation and maintenance. Effective condition assessment and aging management (AM) requires a co-ordinated application of research and development (R and D) knowledge, plant or component design, and a thorough understanding of the operational history and the current plant programs including monitoring, inspection and maintenance related to aging. In fact, the R and D program at AECL has been restructured to provide tools and databases for condition assessment and AM. An example is the use of our knowledge of component design and function and system chemistry to interpret eddy current data obtained from SG tubing and predict primary side fouling behaviour. That knowledge, coupled with our understanding of heat transport and nuclear steam supply systems performance provides input not only for current condition assessment, but also for planning of remedial actions. Several Canadian

  8. Thermodynamic investigation of an integrated gasification plant with solid oxide fuel cell and steam cycles

    Energy Technology Data Exchange (ETDEWEB)

    Rokni, Masoud [Technical Univ. of Denmark, Lyngby (Denmark). Dept. of Mechanical Engineering, Thermal Energy System

    2012-07-01

    A gasification plant is integrated on the top of a solid oxide fuel cell (SOFC) cycle, while a steam turbine (ST) cycle is used as a bottoming cycle for the SOFC plant. The gasification plant was fueled by woodchips to produce biogas and the SOFC stacks were fired with biogas. The produced gas was rather clean for feeding to the SOFC stacks after a simple cleaning step. Because all the fuel cannot be burned in the SOFC stacks, a burner was used to combust the remaining fuel. The off-gases from the burner were then used to produce steam for the bottoming steam cycle in a heat recovery steam generator (HRSG). The steam cycle was modeled with a simple single pressure level. In addition, a hybrid recuperator was used to recover more energy from the HRSG and send it back to the SOFC cycle. Thus two different configurations were investigated to study the plants characteristic. Such system integration configurations are completely novel and have not been studied elsewhere. Plant efficiencies of 56% were achieved under normal operation which was considerably higher than the IGCC (Integrated Gasification Combined Cycle) in which a gasification plant is integrated with a gas turbine and a steam turbine. Furthermore, it is shown that under certain operating conditions, plant efficiency of about 62 is also possible to achieve. (orig.)

  9. Characteristics of fluctuating pressure generated in BWR main steam lines

    International Nuclear Information System (INIS)

    Takahashi, Shiro; Okuyama, Keita; Tamura, Akinori

    2009-01-01

    The BWR-3 steam dryer in the Quad Cities Unit 2 Nuclear Power Plant was damaged by high cycle fatigue due to acoustic-induced vibration. The dryer failure was as attributed to flow-induced acoustic resonance at the stub pipes of safety relief valves (SRVs) in the main steam lines (MSLs). The acoustic resonance was considered to be generated by interaction between the sound field and an unstable shear layer across the closed side branches with SRV stub pipes. We have started a research program on BWR dryers to develop their loading evaluation methods. Moreover, it has been necessary to evaluate the dryer integrity of BWR-5 plants which are the main type of BWR in Japan. In the present study, we used 1/10-scale BWR tests and analyses to investigate the flow-induced acoustic resonance and acoustic characteristics in MSLs. The test apparatus consisted of a steam dryer, a steam dome and 4 MSLs with 20 SRV stub pipes. A finite element method (FEM) was applied for the calculation of three-dimensional wave equations in acoustic analysis. We demonstrated that remarkable fluctuating pressures occurred in high and low frequency regions. High frequency fluctuating pressures was generated by the flow-induced acoustic resonance in the SRV stub pipes. Low frequency fluctuating pressure was generated in an MSL with the dead leg. The frequency of the latter almost coincided with the natural frequency of the MSL with the dead leg. The amplitude of the fluctuating pressures in the multiple stub pipes became more intense because of interaction between them compared with that in the single stub pipe. Acoustic analysis results showed that the multiple stub pipes caused several natural frequencies in the vicinity of the natural frequency of the single stub pipe and several modes of the standing wave in the MSLs. (author)

  10. Effect of Ovality on Maximum External Pressure of Helically Coiled Steam Generator Tubes with a Rectangular Wear

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Dong In; Lim, Eun Mo; Huh, Nam Su [Seoul National Univ. of Science and Technology, Seoul (Korea, Republic of); Choi, Shin Beom; Yu, Je Yong; Kim, Ji Ho; Choi, Suhn [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    A structural integrity of steam generator tubes of nuclear power plants is one of crucial parameters for safe operation of nuclear power plants. Thus, many studies have been made to provide engineering methods to assess integrity of defective tubes of commercial nuclear power plants considering its operating environments and defect characteristics. As described above, the geometric and operating conditions of steam generator tubes in integral reactor are significantly different from those of commercial reactor. Therefore, the structural integrity assessment of defective tubes of integral reactor taking into account its own operating conditions and geometric characteristics, i. e., external pressure and helically coiled shape, should be made to demonstrate compliance with the current design criteria. Also, ovality is very specific characteristics of the helically coiled tube because it is occurred during the coiling processes. The wear, occurring from FIV (Flow Induced Vibration) and so on, is main degradation of steam generator tube. In the present study, maximum external pressure of helically coiled steam generator tube with wear is predicted based on the detailed 3-dimensional finite element analysis. As for shape of wear defect, the rectangular shape is considered. In particular, the effect of ovality on the maximum external pressure of helically coiled tubes with rectangular shaped wear is investigated. In the present work, the maximum external pressure of helically coiled steam generator tube with rectangular shaped wear is investigated via detailed 3-D FE analyses. In order to cover a practical range of geometries for defective tube, the variables affecting the maximum external pressure were systematically varied. In particular, the effect of tube ovality on the maximum external pressure is evaluated. It is expected that the present results can be used as a technical backgrounds for establishing a practical structural integrity assessment guideline of

  11. PWSCC Potential on the Drain Tubes of WEC Model 51F Steam Generators in Domestic Plants

    International Nuclear Information System (INIS)

    Chang, B. I.; Song, M. S.; Yoon, K. S.; Kim, I. Y.

    2009-01-01

    The drain couplings of Westinghouse Model 51F steam generators that had been operated in the domestic Nuclear Power Plants were modified and repaired in accordance with the corrective action of replacing the existing Alloy 600 weld build-up with Alloy 690(Alloy 52/152) weld build-up in order to increase its resistance to primary water stress corrosion cracking (PWSCC). The drain tube made of alloy 600, however, was not replaced and left susceptible to the PWSCC. Among the environmental, metallurgical and mechanical factors controlling a susceptibility to the PWSCC, it is believed that tensile stresses play an important role. The objective of this study is to conservatively estimate stress state of the drain tube during fabrication and when exposed to normal plant operations, and to investigate its potential for the PWSCC

  12. Using MAAP 4.0 to determine risks from steam generator tube leaks or ruptures

    International Nuclear Information System (INIS)

    Fuller, E.L.; Kenton, M.A.

    1996-01-01

    As part of the Electric Power Research Institute (EPRI) program on steam generator degradation specific management (SGDSM), the nuclear industry is investigating the effects on plant risk of severe accidents involving steam generator tube leaks or ruptures. Such accidents fall into three classes: those caused by spontaneous, steam generator tube ruptures (SGTRs) that subsequently result in core damage; those caused by design-basis accidents that lead to induced tube ruptures and subsequent core damage; and those that progress to core damage, such as a station blackout (SBO), with subsequent induced tube leakage or rupture. In each case, the potential exists for a significant fraction of the fission products released from a damaged core to reach the environment through the leaking or ruptured tubes

  13. Modeling and Simulation of U-tube Steam Generator

    Science.gov (United States)

    Zhang, Mingming; Fu, Zhongguang; Li, Jinyao; Wang, Mingfei

    2018-03-01

    The U-tube natural circulation steam generator was mainly researched with modeling and simulation in this article. The research is based on simuworks system simulation software platform. By analyzing the structural characteristics and the operating principle of U-tube steam generator, there are 14 control volumes in the model, including primary side, secondary side, down channel and steam plenum, etc. The model depends completely on conservation laws, and it is applied to make some simulation tests. The results show that the model is capable of simulating properly the dynamic response of U-tube steam generator.

  14. Wastage of Steam Generator Tubes by Sodium-Water Reaction

    International Nuclear Information System (INIS)

    Jeong, Ji Young; Kim, Jong Man; Kim, Tae Joon; Choi, Jong Hyeun; Kim, Byung Ho; Lee, Yong Bum; Park, Nam Cook

    2010-01-01

    The Korea Advanced LIquid MEtal Reactor (KALIMER) steam generator is a helical coil, vertically oriented, shell-and-tube type heat exchanger with fixed tube-sheet. The conceptual design and outline drawing of the steam generator are shown in Figure 1. Flow is counter-current, with sodium on the shell side and water/steam on the tube side. Sodium flow enters the steam generator through the upper inlet nozzles and then flows down through the tube bundle. Feedwater enters the steam generator through the feedwater nozzles at the bottom of steam generator. Therefore, if there is a hole or a crack in a heat transfer tube, a leakage of water/steam into the sodium may occur, resulting in a sodium-water reaction. When such a leak occurs, so-called 'wastage' is the result which may cause damage to or a failure of the adjacent tubes. If a steam generator is operated for some time in this condition, it is possible that it might create an intermediate leak state which would then give rise to the problems of a multi-target wastage in a very short time. Therefore, it is very important to predict these phenomena quantitatively from the view of designing a steam generator and its leak detection systems. For this, multi-target wastage tests for modified 9Cr-1Mo steel tube bundle by intermediate leaks are being prepared

  15. Prospects for the development of coal-steam plants in Russia

    Science.gov (United States)

    Tumanovskii, A. G.

    2017-06-01

    Evaluation of the technical state of the modern coal-fired power plants and quality of coal consumed by Russian thermal power plants (TPP) is provided. Measures aimed at improving the economic and environmental performance of operating 150-800 MW coal power units are considered. Ways of efficient use of technical methods of NO x control and electrostatic precipitators' upgrade for improving the efficiency of ash trapping are summarized. Examples of turbine and boiler equipment efficiency upgrading through its deep modernization are presented. The necessity of the development and introduction of new technologies in the coal-fired power industry is shown. Basic technical requirements for a 660-800 MW power unit with the steam conditions of 28 MPa, 600/600°C are listed. Design solutions taking into account features of Russian coal combustion are considered. A field of application of circulating fluidized bed (CFB) boilers and their effectiveness are indicated. The results of development of a new generation coal-fired TPP, including a steam turbine with an increased efficiency of the compartments and disengaging clutch, an elevated steam conditions boiler, and a highly efficient NO x /SO2 and ash particles emission control system are provided. In this case, the resulting ash and slag are not to be sent to the ash dumps and are to be used to a maximum advantage. Technical solutions to improve the efficiency of coal gasification combined cycle plants (CCP) are considered. A trial plant based on a 16 MW gas turbine plant (GTP) and an air-blown gasifier is designed as a prototype of a high-power CCP. The necessity of a state-supported technical reequipment and development program of operating coal-fired power units, as well as putting into production of new generation coal-fired power plants, is noted.

  16. Steam generator leak detection using acoustic method

    International Nuclear Information System (INIS)

    Goluchko, V.V.; Sokolov, B.M.; Bulanov, A.N.

    1982-05-01

    The main requirements to meet by a device for leak detection in sodium - water steam generators are determined. The potentialities of instrumentation designed based on the developed requirements have been tested using a model of a 550 kw steam generator [fr

  17. Mathematical modeling of control system for the experimental steam generator

    Directory of Open Access Journals (Sweden)

    Podlasek Szymon

    2016-01-01

    Full Text Available A steam generator is an essential unit of each cogeneration system using steam machines. Currently one of the cheapest ways of the steam generation can be application of old steam generators came from army surplus store. They have relatively simple construction and in case of not so exploited units – quite good general conditions, and functionality of mechanical components. By contrast, electrical components and control systems (mostly based on relay automatics are definitely obsolete. It is not possible to use such units with cooperation of steam bus or with steam engines. In particular, there is no possibility for automatically adjustment of the pressure and the temperature of the generated steam supplying steam engines. Such adjustment is necessary in case of variation of a generator load. The paper is devoted to description of improvement of an exemplary unit together with construction of the measurement-control system based on a PLC. The aim was to enable for communication between the steam generator and controllers of the steam bus and steam engines in order to construction of a complete, fully autonomic and maintenance-free microcogeneration system.

  18. The role of the safety analysis organization in steam generators replacement and reactor vessel head replacement evaluations

    International Nuclear Information System (INIS)

    Choe, Whee G.; Boatwright, W.J.

    2004-01-01

    When a major component in a nuclear power plant is replaced, especially the steam generators, the plant operator is presented a rare opportunity to learn from operating experience and significantly improve the performance, reliability and robustness of the plant. In addition to the use of improved materials, improved design margins can be built into the component specification that can later be used to provide meaningful operating margins. A Safety Analysis organization that is well-integrated with other plant organizations and possesses a detailed knowledge of the plant design and licensing bases can effectively balance the wants and needs of each organization to optimize the benefits realized by the plant as a whole. Knowledge of the assumptions, limitations, and available margins, both analytical and operating, can be used to specify a replacement steam generator design that optimizes costs and operating improvements. The work scope required to support the new design can be controlled through carefully selected and evaluated restrictions in operations, development of alternate operating strategies, and imposition of appropriate limitations. The important point is that the effective Safety Analysis organization must possess both the breadth and depth of knowledge of the plant design and operations and proactively use this information to support the replacement steam generator project. (author)

  19. Decontamination of steam generators at Loviisa NPS - The decision making and the results

    International Nuclear Information System (INIS)

    Wahlstroem, Bjoern G.

    1984-01-01

    In 1980, during the annual inspections at Loviisa 1, 440 MWe PWR unit, some minor faults in the welding seams of the water chambers in two of the six steam generators were indicated. This led to enlarged inspection work and to thousands of working hours inside the steam generators. The plant had been three years in operation, so the dose rates in the steam generators were rather high. In this case it turned out, that a formal radiation protection optimization procedure would not give the answer on how to go ahead, as there were several practical and psychological factors influencing the decision making process. Anyhow, the result was that a decontamination apparatus was urgently planned and constructed, and advice on tested decontamination chemicals was received from the plant supplier. Using the decontamination machine with alternating basic and acid solutions, a decontamination factor of DF = 300 was reached, and the repair work could be performed without any restrictions on working time. This paper points out some limiting factors in the decision making process and describes the decontamination equipment, the decontamination solutions and the programme. The cost per saved collective dose unit is also calculated. (author)

  20. Steam generator materials and secondary side water chemistry in nuclear power stations

    International Nuclear Information System (INIS)

    Rudelli, M.D.

    1979-04-01

    The main purpose of this work is to summarize the European and North American experiences regarding the materials used for the construction of the steam generators and their relative corrosion resistance considering the water chemestry control method. Reasons underlying decision for the adoption of Incoloy 800 as the material for the secondary steam generator system for Atucha I Nuclear Power Plant (Atucha Reactor) and Embalse de Rio III Nuclear Power Plant (Cordoba Reactor) are pointed out. Backup information taken into consideration for the decision of utilizing the All Volatil Treatment for the water chemistry control of the Cordoba Reactor is detailed. Also all the reasonswhich justify to continue with the congruent fosfatic method for the Atucha Reactor are analyzed. Some investigation objectives which would eventually permit the revision of the decisions taken on these subjects are proposed. (E.A.C.) [es

  1. Steam Generator Maintenance Measures as Part of an Integrated Management in PWRs

    International Nuclear Information System (INIS)

    Weiss, S.; Drexler, A.; Fandrich, J.

    2012-01-01

    The Steam generator condition is a key factor for plant performance, high plant availability, possible life time extension and plant safety. Its major safety function is to act as a barrier between the radioactive primary side and the non-radioactive secondary side of pressurized water reactors. Any degradation mechanism, which impairs this barrier function, is a significant safety concern. The main reason for SG tube failure is known to be the accumulation of deposits contributing to formation of local aggressive conditions. Furthermore deposits on primary as well as secondary side of SG tubes reduce the heat transfer performance. A SG cleanliness management program is therefore mandatory to ensure high plant performance regarding efficiency as well as component integrity. Cleaning measures of steam generator are essential parts of the cleanliness management program. Mechanical cleaning, e.g. tubesheet and inner bundle lancing or upper bundle flushing are efficient methods for removal of local loose deposits. But a chemical cleaning is the only method to remove deposits from the complete SG. AREVA is providing with its C 3 (customized chemical cleaning) concept a tool box of chemical cleaning methods, to adapt to plant specific needs and requirements. (author)

  2. Calculation of temperature fields formed in induction annealing of closing welded joint of jacket of steam generator for WWER 440 type nuclear power plant using ICL 2960 computer

    International Nuclear Information System (INIS)

    Sajnar, P.; Fiala, J.

    1983-01-01

    The problems are discussed of the mathematical description and simulation of temperature fields in annealing the closing weld of the steam generator jacket of the WWER 440 nuclear power plant. The basic principles are given of induction annealing, the method of calculating temperature fields is indicated and the mathematical description is given of boundary conditions on the outer and inner surfaces of the steam generator jacket for the computation of temperature fields arising during annealing. Also described are the methods of determining the temperature of exposed parts of heat exchange tubes inside the steam generator and the technical possibilities are assessed of the annealing equipment from the point of view of its computer simulation. Five alternatives are given for the computation of temperature fields in the area around the weld for different boundary conditions. The values are given of maximum differences in the temperatures of the metal in the annealed part of the steam generator jacket which allow the assessment of individual computation variants, this mainly from the point of view of observing the course of annealing temperature in the required width of the annealed jacket of the steam generator along both sides of the closing weld. (B.S.)

  3. Mechanical design of a sodium heated steam generator

    International Nuclear Information System (INIS)

    Chetal, S.C.

    1975-01-01

    FBTR steam generator is a once through type unit consisting of four 12.5 MW thermal modules generating a total of 74 tons per hour of steam at 125 bar and 480 0 C. This paper outlines the mechanical design of such type of steam generator with emphasis on special design problems associated with this type of sodium to water steam heat exchanger, namely, thermal cycling of transition zone where nucleate boiling changes over to film boiling, application of pressure vessel design criteria for transient pressures, thermal stress evaluation resulting from differential expansion between shell and tube in this typical configuration, sodium headers support design, thermal sleeve, design, thermal shock analysis in thick tubes, thermal stress resulting from stratification and stability of expansion bends against vibration. Some of the possible design changes for the future large size steam generator are outlined. (author)

  4. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2006-01-01

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Units 2 that will extend the in-service life of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from the bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  5. LMFBR steam generator leak detection development in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Magee, P M; Gerrels, E E; Greene, D A [General Electric Company, Sunnyvale, CA (United States); McKee, J [Argonne National Laboratory, Argonne, IL (United States)

    1978-10-01

    Leak detection for Liquid Metal Fast Breeder Reactor steam generators is an important economic factor in the shutdown, repair and restart of a plant. Development of leak detection systems in the U.S. has concentrated on four areas: (1) chemical (H{sub 2} and O{sub 2}) leak detection meters; (2) acoustic leak detection/location techniques; (3) investigation of leak behavior (enlargement, damage effects, plugging and unplugging); and (4) data management for plant operations. This paper discusses the status, design aspects, and applications of leak detection technology for LMFBR plants. (author)

  6. LMFBR steam generator leak detection development in the United States

    International Nuclear Information System (INIS)

    Magee, P.M.; Gerrels, E.E.; Greene, D.A.; McKee, J.

    1978-01-01

    Leak detection for Liquid Metal Fast Breeder Reactor steam generators is an important economic factor in the shutdown, repair and restart of a plant. Development of leak detection systems in the U.S. has concentrated on four areas: (1) chemical (H 2 and O 2 ) leak detection meters; (2) acoustic leak detection/location techniques; (3) investigation of leak behavior (enlargement, damage effects, plugging and unplugging); and (4) data management for plant operations. This paper discusses the status, design aspects, and applications of leak detection technology for LMFBR plants. (author)

  7. Molten salt steam generator subsystem research experiment. Volume I. Phase 1 - Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-10-01

    A study was conducted for Phase 1 of a two-phase project whose objectives were to develop a reliable, cost-effective molten salt steam generating subsystem for solar thermal plants, minimize uncertainty in capital, operating, and maintenance costs, and demonstrate the ability of molten salt to generate high-pressure, high-temperature steam. The Phase 1 study involved the conceptual design of molten salt steam generating subsystems for a nominal 100-MWe net stand-alone solar central receiver electric generating plant, and a nominal 100-MWe net hybrid fossil-fueled electric power generating plant that is 50% repowered by a solar central receiver system. As part of Phase 1, a proposal was prepared for Phase 2, which involves the design, construction, testing and evaluation of a Subsystem Research Experiment of sufficient size to ensure successful operation of the full-size subsystem designed in Phase 1. Evaluation of several concepts resulted in the selection of a four-component (preheater, evaporator, superheater, reheater), natural circulation, vertically oriented, shell and tube (straight) heat exchanger arrangement. Thermal hydraulic analysis of the system included full and part load performance, circulation requirements, stability, and critical heat flux analysis. Flow-induced tube vibration, tube buckling, fatigue evaluation of tubesheet junctions, steady-state tubesheet analysis, and a simplified transient analysis were included in the structural analysis of the system. Operating modes and system dynamic response to load changes were identified. Auxiliary equipment, fabrication, erection, and maintenance requirements were also defined. Installed capital costs and a project schedule were prepared for each design.

  8. Mitigation of organically bound sulphate from water treatment plants at Bruce NGS and impact on steam generator secondary side chemistry control

    Energy Technology Data Exchange (ETDEWEB)

    Nashiem, R.; Davloor, R.; Harper, B.; Smith, K. [Bruce Power, Tiverton, Ontario (Canada); Gauthier, C. [CTGIX Services Inc., Burlington, Ontario (Canada); Schexnailder, S. [GE Water and Process Technologies, Dallas, Texas (United States)

    2010-07-01

    Bruce Power is the source of more than 20 per cent of Ontario's electricity and currently operates six reactor units at the Bruce Nuclear Generating Station A (two units) and B (four units) stations located on Lake Huron. This paper discusses the challenges faced and operating experience (OPEX) gained in meeting WANO 1.0 chemistry performance objectives for steam generator secondary side chemistry control, particularly with control of steam generator sulphates. A detailed sampling and analysis program conducted as part of this study concluded that a major contributor to steam generator (SG) elevated sulphates is Organically Bound Sulphate (OBS) in Water Treatment Plants (WTP) effluent. The Bruce A and B WTPs consist of clarification with downstream sand and carbon filtration for Lake Water pre-treatment, which are followed by conventional Ion Exchange (IX) demineralization. Samples taken from various locations in the process stream were analyzed for a variety of parameters including both organic bound and inorganic forms of sulphate. The results are inconclusive with respect to finding the definitive source of OBS. This is primarily due to the condition that the OBS in the samples, which are in relatively low levels, are masked during chemical analysis by the considerably higher inorganic sulphate background. Additionally, it was also determined that on-line Total Organic Carbon (TOC) levels at different WTP locations did not always correlate well with OBS levels in the effluent, such that TOC could not be effectively used as a control parameter to improve OBS performance of the WTP operation. Improvement efforts at both plants focused on a number of areas including optimization of clarifier operation, replacement of IX resins, addition of downstream mobile polishing trailers, testing of new resins and adsorbents, pilot-scale testing with a Reverse Osmosis (RO) rig, review of resin regeneration and backwashing practices, and operating procedure improvements

  9. Mitigation of organically bound sulphate from water treatment plants at Bruce NGS and impact on steam generator secondary side chemistry control

    International Nuclear Information System (INIS)

    Nashiem, R.; Davloor, R.; Harper, B.; Smith, K.; Gauthier, C.; Schexnailder, S.

    2010-01-01

    Bruce Power is the source of more than 20 per cent of Ontario's electricity and currently operates six reactor units at the Bruce Nuclear Generating Station A (two units) and B (four units) stations located on Lake Huron. This paper discusses the challenges faced and operating experience (OPEX) gained in meeting WANO 1.0 chemistry performance objectives for steam generator secondary side chemistry control, particularly with control of steam generator sulphates. A detailed sampling and analysis program conducted as part of this study concluded that a major contributor to steam generator (SG) elevated sulphates is Organically Bound Sulphate (OBS) in Water Treatment Plants (WTP) effluent. The Bruce A and B WTPs consist of clarification with downstream sand and carbon filtration for Lake Water pre-treatment, which are followed by conventional Ion Exchange (IX) demineralization. Samples taken from various locations in the process stream were analyzed for a variety of parameters including both organic bound and inorganic forms of sulphate. The results are inconclusive with respect to finding the definitive source of OBS. This is primarily due to the condition that the OBS in the samples, which are in relatively low levels, are masked during chemical analysis by the considerably higher inorganic sulphate background. Additionally, it was also determined that on-line Total Organic Carbon (TOC) levels at different WTP locations did not always correlate well with OBS levels in the effluent, such that TOC could not be effectively used as a control parameter to improve OBS performance of the WTP operation. Improvement efforts at both plants focused on a number of areas including optimization of clarifier operation, replacement of IX resins, addition of downstream mobile polishing trailers, testing of new resins and adsorbents, pilot-scale testing with a Reverse Osmosis (RO) rig, review of resin regeneration and backwashing practices, and operating procedure improvements

  10. Spanish approach to research and development applied to steam generator tubes structural integrity and life management

    International Nuclear Information System (INIS)

    Lozano, J.; Bollini, G.J.

    1997-01-01

    The operating experience acquired from certain Spanish Nuclear Power Plant steam generators shows that the tubes, which constitute the second barrier to release of fission products, are susceptible to mechanical damage and corrosion as a result of a variety of mechanisms, among them wastage, pitting, intergranular attack (IGA), stress-corrosion cracking (SCC), fatigue-induced cracking, fretting, erosion/corrosion, support plate denting, etc. These problems, which are common in many plants throughout the world, have required numerous investments by the plants (water treatment plants, replacement of secondary side materials such as condensers and heaters, etc.), have meant costs (operation, inspection and maintenance) and have led to the unavailability of the affected units. In identifying and implementing all these preventive and corrective measures, the Spanish utilities have moved through three successive stages: in the initial stage, the main source of information and of proposals for solutions was the Plant Vendor, whose participation in this respect was based on his own Research and Development programs; subsequently, the Spanish utilities participated jointly in the EPRI Steam Generator Owners Group, collaborating in financing; finally, the Spanish utilities set up their own Steam Generator Research and Development program, while maintaining relations with EPRI programs and those of other countries through information interchange

  11. Manpower development for safe operation of nuclear power plant. China. Steam generator maintenance, cleaning and repair. Activity: 3.1.8-Task-04. Technical report

    International Nuclear Information System (INIS)

    Esposito, J.N.

    1994-01-01

    The objective of this mission was to present detailed state-of-the-art information on steam generator design, operations and maintenance, to the management, engineers and operators of the Qinshan Nuclear Power Plants. In addition, some limited operation was presented by the Qinshan Nuclear Power Plant representatives in order to aid in focussing the presentations and promoting a high level of discussion

  12. Sludge Lancing and Visual Inspection of Steam Generator for KORI Nuclear Power Plant Unit 3

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo-Tae [Korea Hydro and Nuclear Power Co. Ltd. Central Research Institute, Daejeon(Korea, Republic of); Kim, Sang-Tae; Hong, Jae-Yung; Jeong, Yun-Soon [Sae-An Engineering Corporation, Seoul (Korea, Republic of)

    2015-05-15

    Annulus, tube-lane, and in-bundle area of the steam generators were searched for possible foreign objects. No new foreign objects were found. Two foreign objects which were found during previous outage were impossible to remove. Mock-up training before the operation was helpful to finish the service as scheduled. Sludge lancing of the three steam generators was made using FOLAS-I lancing system. FOSAR operations were done using video probe and special tools of Sae-An Engineering Cooperation. The weight of sludge removed from SG 'A', 'B', and 'C' was 177kg, 134kg, 117kg respectively. Bag filters for and cartridge filters consumed for SG 'A', 'B', and 'C' was (53,414), (75,243), and (61,171) respectively. Foreign object search operation for the annulus, the tube lane, and in-bundle area of the steam generators found nothing. Retrieval of the two remaining foreign objects from the previous outage was tried but failed.

  13. Sludge Lancing and Visual Inspection of Steam Generator for KORI Nuclear Power Plant Unit 3

    International Nuclear Information System (INIS)

    Jeong, Woo-Tae; Kim, Sang-Tae; Hong, Jae-Yung; Jeong, Yun-Soon

    2015-01-01

    Annulus, tube-lane, and in-bundle area of the steam generators were searched for possible foreign objects. No new foreign objects were found. Two foreign objects which were found during previous outage were impossible to remove. Mock-up training before the operation was helpful to finish the service as scheduled. Sludge lancing of the three steam generators was made using FOLAS-I lancing system. FOSAR operations were done using video probe and special tools of Sae-An Engineering Cooperation. The weight of sludge removed from SG 'A', 'B', and 'C' was 177kg, 134kg, 117kg respectively. Bag filters for and cartridge filters consumed for SG 'A', 'B', and 'C' was (53,414), (75,243), and (61,171) respectively. Foreign object search operation for the annulus, the tube lane, and in-bundle area of the steam generators found nothing. Retrieval of the two remaining foreign objects from the previous outage was tried but failed

  14. Steam generator tube integrity program. Phase I report

    International Nuclear Information System (INIS)

    Alzheimer, J.M.; Clark, R.A.; Morris, C.J.; Vagins, M.

    1979-09-01

    The results are presented of the pressure tests performed as part of Phase I of the Steam Generator Tube Integrity (SGTI) program at Battelle Pacific Northwest Laboratory. These tests were performed to establish margin-to-failure predictions for mechanically defected Pressurized Water Reactor (PWR) steam generator tubing under operating and accident conditions. Defect geometries tested were selected because they simulate known or expected defects in PWR steam generators. These defect geometries are Electric Discharge Machining (EDM) slots, elliptical wastage, elliptical wastage plus through-wall slot, uniform thinning, denting, denting plus uniform thinning, and denting plus elliptical wastage. All defects were placed in tubing representative of that currently used in PWR steam generators

  15. Influence of sodium water reaction on MONJU steam generator

    International Nuclear Information System (INIS)

    Takahashi, T.; Ohmori, Y.; Hoshi, Y.

    1984-01-01

    Despite the strenuous efforts improving the reliability of steam generators, it is required to ascertain the safe shutdown at Design Basis Leak and also to take the necessary actions to minimize the plant damage for more realistic small leaks. The process of Monju DBL selection and its supporting R and D works are included in this paper, together with the evaluation of system and critical components in direct connection with DBL. The detail plant shutdown procedures (including auxiliary system sequential action) at the time of water leaks are also explained. (author)

  16. Perspective of the Westinghouse steam generator secondary side maintenance approach

    Energy Technology Data Exchange (ETDEWEB)

    Ramaley, D. [Westinghouse Electric Company LLC, Cranberry Township, Pennsylvania (United States)

    2012-07-01

    Historically, Westinghouse had developed a set of steam generator secondary maintenance guidelines focused around performing recurring activities each outage without direct regards to the age, deposit loading, operational status, or corrosion status of the steam generator. Through the evolution of steam generator design and steam generator condition data, Westinghouse now uses a proactive assessment and planning approach for utilities. Westinghouse works with utilities to develop steam generator secondary maintenance plans for long term steam generator viability. Westinghouse has developed a portfolio of products to allow utilities to optimize steam generator operability and develop programs aimed at maintaining the steam generator secondary side in a favorable condition for successful long term operation. Judicious use of the means available for program development should allow for corrosion free operation, long term full power operation at optimum thermal efficiency, and leveling of outage expenditures over a long period of time. This paper will review the following required elements for an effective steam generator secondary side strategy: • Assessment: In order to develop an appropriate maintenance strategy, actions must be taken to obtain an accurate picture of the SG secondary side condition. • Forecasting: Using available data predictions are developed for future steam generator conditions and required maintenance actions. • Action: Cost effective engineering and maintenance actions must be completed at the appropriate time as designated by the plan. • Evaluation of Results: Following execution of maintenance tactics, it is necessary to revise strategy and develop technology enhancements as appropriate. (author)

  17. Large nuclear steam turbine plants

    International Nuclear Information System (INIS)

    Urushidani, Haruo; Moriya, Shin-ichi; Tsuji, Kunio; Fujita, Isao; Ebata, Sakae; Nagai, Yoji.

    1986-01-01

    The technical development of the large capacity steam turbines for ABWR plants was partially completed, and that in progress is expected to be completed soon. In this report, the outline of those new technologies is described. As the technologies for increasing the capacity and heightening the efficiency, 52 in long blades and moisture separating heaters are explained. Besides, in the large bore butterfly valves developed for making the layout compact, the effect of thermal efficiency rise due to the reduction of pressure loss can be expected. As the new technology on the system side, the simplification of the turbine system and the effect of heightening the thermal efficiency by high pressure and low pressure drain pumping-up method based on the recent improvement of feed water quality are discussed. As for nuclear steam turbines, the actual records of performance of 1100 MW class, the largest output at present, have been obtained, and as a next large capacity machine, the development of a steam turbine of 1300 MWe class for an ABWR plant is in progress. It can be expected that by the introduction of those new technologies, the plants having high economical efficiency are realized. (Kako, I.)

  18. Steam generator tube rupture: studies to improve plant procedure

    International Nuclear Information System (INIS)

    Tellier, N.; Zilliox, C.

    1984-10-01

    These accidents have the particularities to lead to atmospheric radioactive release and to be able to be determinated with appropriate operator actions. These radioactive releases are function of several parameters of which sensitivity is analyzed. The major part of the calculations were performed by EDF with an home made code called ''AXEL''. The main conclusions are: - the optimization of the safety injection monitoring to minimize radioactive releases to atmosphere, while ensuring the cooling of the core; - the radioactive releases to atmosphere are very low in any case but much more important if the filling of the steam generator secondary side cannot be avoided

  19. Double wall steam generator tubing

    International Nuclear Information System (INIS)

    Padden, T.R.; Uber, C.F.

    1983-01-01

    Double-walled steam generator tubing for the steam generators of a liquid metal cooled fast breeder reactor prevents sliding between the surfaces due to a mechanical interlock. Forces resulting from differential thermal expansion between the outer tube and the inner tube are insufficient in magnitude to cause shearing of base metal. The interlock is formed by jointly drawing the tubing, with the inside wall of the outer tube being already formed with grooves. The drawing causes the outer wall of the inner tube to form corrugations locking with the grooves. (author)

  20. Physics of steam generators and visit of Saint-Marcel plant

    International Nuclear Information System (INIS)

    Gillet, N.; Gloaguen, C.; Holcblat, A.; Borsoi, L.; Adobes, A.; David, F.; Greiner, E.; Pascal-Ribot, S.; Gauchet, J.P.; Mercier, L.; Leomy, F.

    2004-01-01

    This document gathers the transparencies presented at the 6. technical session of the French nuclear energy society (SFEN) in June 2004. The main topic was the physics of steam generators: 1 - description (G. Paudroux, J.Y. Guena, M. Petit); 2 - thermo-hydraulics (A. Holcblat, F. David, S. Pascal-Ribot); 3 - mechanics (N. Gillet, L. Borsoi, A. Adobes); 4 - monitoring and maintenance means (J.P. Gauchet, L. Mercier, F. Leomy); 5 - replacement (C. Gloaguen, E. Greiner). (J.S.)