WorldWideScience

Sample records for station igcc project

  1. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  2. Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

    International Nuclear Information System (INIS)

    1992-06-01

    The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC's Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE's share of the project cost will be 50 percent, or $134,996,550

  3. IGCC demonstration project status combustion engineering IGCC repowering project

    International Nuclear Information System (INIS)

    Glamuzina, R.W.; Allen, R.J.; Peletz, L.J.

    1993-01-01

    This demonstration project was originally conceived as the repowering of an existing plant facility, the Lakeside Station in Springfield, Illinois. The Owner, City Water, Light and Power (CWL ampersand P), has removed five of the original boilers and three of the original turbines. The buildings have had asbestos insulation removed and the interiors have been prepared for the construction of a single Integrated Gasification Combined Cycle (IGCC) process train that will generate a net output of 60 megawatts. The plant consists of a combined cycle (gas turbine, heat recovery steam generator, steam turbine) power train located in the existing buildings and a coal gasification system in a new building. The gasification system contains ABB CE's air-blown, entrained flow, two stage gasifier, an advanced hot gas desulfurization system by General Electric Environmental Services, Inc. and the necessary auxiliary systems. The plant is designed to produce a nominal 60 MW net output with an ambient air temperature of 95 degrees F and a cooling water temperature of 89 degrees F on either Natural Gas or Illinois No. 5 coal

  4. Pinon Pine IGCC project status

    International Nuclear Information System (INIS)

    Higginbotham, E.B.; Lamarre, L.J.; Glazer, M.

    1993-01-01

    Sierra Pacific Power Company (SPPCo) intends to build the Pinon Pine Power Project, an integrated coal gasification combined cycle (IGCC) plant at its Tracy Power Station near Reno, Nevada. The plant will burn approximately 800 tons of coal per day to generate electricity in a base load application. The Pinon Project was selected by the U.S. Department of Energy (DOE) for funding under Round IV of the Clean Coal Technology Program. The project will demonstrate the use of the KRW agglomerating fluidized bed gasifer operating in the air blown mode. Hot gas cleanup consisting of particulate and sulfur removal will also be demonstrated. The Cooperative Agreement between SPPCo and the DOE was executed in August 1992. Foster Wheeler USA Corporation (FWUSA) will provide engineering and construction management services. The M.W. Kellogg Company (MWK) will provide engineering of the gasifer and hot gas cleanup systems. A discussion of project progress since the 1992 Clean Coal Technology Conference, design and economic considerations, and current project status is presented

  5. Kotka ecopower IGCC-project, the attempt to transfer the biocycle project to Finland

    International Nuclear Information System (INIS)

    Salo, K.

    1998-01-01

    The Danish utilities Elsam and Elkraft planned to build a small (7 MW e ) IGCC-plant in Denmark, called Biocycle Project, based on the gasification and gas clean-up technology of Enviropower Inc. EU/THERMIE program committed to finance part of the investment. The project, however, was not feasible due to the difficulty of finding a suitable customer and sufficient amount of reasonably priced biomass. For this reason a new host and site was found for the Biocycle project. The new site was in Kotka, Finland, where Kotka Energy Ltd., the Energy Board of the City of Kotka acted as the main partner. The fuel of the IGCC project would have been sugar mill wood residue from Xyrofin Inc. During the feasibility investigation (project definition phase) Xyrofin Inc. made the decision to change the production process which eliminated the wood waste production. Without no-cost fuel and due to the low electricity price in Finland the small size IGCC power plant proved not to be feasible. (author)

  6. ConocoPhillips Sweeny IGCC/CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Talarico; Charles Sugg; Thomas Hren; Lauri Branch; Joseph Garcia; Alan Rezigh; Michelle Pittenger; Kathleen Bower; Jonathan Philley; Michael Culligan; Jeremy Maslen; Michele Woods; Kevin Elm

    2010-06-16

    Under its Industrial Carbon Capture and Sequestration (ICCS) Program, the United States (U.S.) Department of Energy (DOE) selected ConocoPhillips Company (ConocoPhillips) to receive funding through the American Recovery and Reinvestment Act (ARRA) of 2009 for the proposed Sweeny Integrated Gasification Combined Cycle (IGCC)/Carbon Capture and Storage (CCS) Project (Project) to be located in Brazoria County, Texas. Under the program, the DOE is partnering with industry to demonstrate the commercial viability and operational readiness of technologies that would capture carbon dioxide (CO{sub 2}) emissions from industrial sources and either sequester those emissions, or beneficially reuse them. The primary objective of the proposed Project was to demonstrate the efficacy of advanced technologies that capture CO{sub 2} from a large industrial source and store the CO{sub 2} in underground formations, while achieving a successful business venture for the entity (entities) involved. The Project would capture 85% of the CO{sub 2} produced from a petroleum coke (petcoke) fed, 703 MWnet (1,000 MWgross) IGCC power plant, using the ConocoPhillips (COP) proprietary and commercially proven E-Gas{trademark} gasification technology, at the existing 247,000 barrel per day COP Sweeny Refinery. In addition, a number of other commercially available technologies would be integrated into a conventional IGCC Plant in a unique, efficient, and reliable design that would capture CO{sub 2}. The primary destination for the CO{sub 2} would be a depleted natural gas field suitable for CO{sub 2} storage ('Storage Facility'). COP would also develop commercial options to sell a portion of the IGCC Plant's CO{sub 2} output to the growing Gulf Coast enhanced oil recovery (EOR) market. The IGCC Plant would produce electric power for sale in the Electric Reliability Council of Texas Houston Zone. The existing refinery effluent water would be treated and reused to fulfill all process

  7. Technical and economic assessments commercial success for IGCC technology in China

    International Nuclear Information System (INIS)

    Xiong, T.

    1998-01-01

    The experiences gained from several Integrated Gasification Combined Cycle (IGCC) demonstration plants operating in the US and Europe facilitate commercial success of this advanced coal-based power generation technology. However, commercialization of coal-based IGCC technology in the West, particularly in the US, is restricted due to the low price of natural gas. On the contrary, in China--the largest coal producer and consumer in the world--a lack of natural gas supply, strong demand for air pollution control and relatively low costs of manufacturing and construction provide tremendous opportunities for IGCC applications. The first Chinese IGCC demonstration project was initiated in 1994, and other potential IGCC projects are in planning. IGCC applications in re-powering, fuel switching and multi-generation also show a great market potential in China. However, questions for IGCC development in China remain; where are realistic opportunities for IGCC projects and how can these opportunities be converted into commercial success? The answers to these questions should focus on the Chinese market needs and emphasize economic benefits, not just clean, or power. High price of imported equipment, high financing costs, and the technical risk of first-of-a-kind installation barricade IGCC development in China. This paper presents preliminary technical and economic assessments for four typical IGCC applications in the Chinese marketplace: central power station, fuel switching, re-powering, and multi-generation. The major factors affecting project economics--such as plant cost, financing, prices of fuel and electricity and operating capacity factor--are analyzed. The results indicate that well-proven technology for versatile applications, preferred financing, reduction of the plant cost, environmental superiority and appropriate project structure are the key for commercial success of IGCC in China

  8. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  9. Sulphur removal in IGCC projects

    Energy Technology Data Exchange (ETDEWEB)

    Cross, F. (Parsons (United Kingdom))

    1998-01-01

    The technology for recovering elemental sulphur from H[sub 2]S bearing gases is well established. The modified Claus Process is the principal work-horse in sulphur recovery and can customarily achieve conversion efficiencies of 95% or better. Nowadays, such a level of recovery is no longer sufficient in most instances and sulphur recovery facility must then include some form of enhanced recovery, usually by treating the Claus tail gas. A number of processes have been introduced to enable the overall recovery to be increased. Recoveries in excess of 99% are both feasible and economic. Use of oxygen in place has become very popular in cases where oxygen is available cheaply or where capacity increases are designed. Most IGCC projects needing an air separation plant would automatically benefit from extending the use of oxygen to the sulphur recovery plant. The most popular route to minimising sulphur emissions in the context of IGCC projects has involved an oxygen based Claus plant followed by tail gas hydrogenation, hydrogen sulphide recovery and its recycle to the Claus section. The recovery of H[sub 2]S from the Claus tail gas can be integrated with the main gas treating system in the gasification plant. The cost advantage of doing so is significant. Parsons has been involved with the technology since 1949 and has been responsible for developments such as the ammonia burning Claus and jointly with Unocal, the BSRP tail gas process and Selectox processes. Recent innovations in response changing environmental and production requirements have included catalytic and tail gas processes which reduce sulphur emissions. 6 figs., 2 tabs.

  10. Sulphur removal in IGCC projects

    Energy Technology Data Exchange (ETDEWEB)

    Cross, F. [Parsons (United Kingdom)

    1998-12-31

    The technology for recovering elemental sulphur from H{sub 2}S bearing gases is well established. The modified Claus Process is the principal work-horse in sulphur recovery and can customarily achieve conversion efficiencies of 95% or better. Nowadays, such a level of recovery is no longer sufficient in most instances and sulphur recovery facility must then include some form of enhanced recovery, usually by treating the Claus tail gas. A number of processes have been introduced to enable the overall recovery to be increased. Recoveries in excess of 99% are both feasible and economic. Use of oxygen in place has become very popular in cases where oxygen is available cheaply or where capacity increases are designed. Most IGCC projects needing an air separation plant would automatically benefit from extending the use of oxygen to the sulphur recovery plant. The most popular route to minimising sulphur emissions in the context of IGCC projects has involved an oxygen based Claus plant followed by tail gas hydrogenation, hydrogen sulphide recovery and its recycle to the Claus section. The recovery of H{sub 2}S from the Claus tail gas can be integrated with the main gas treating system in the gasification plant. The cost advantage of doing so is significant. Parsons has been involved with the technology since 1949 and has been responsible for developments such as the ammonia burning Claus and jointly with Unocal, the BSRP tail gas process and Selectox processes. Recent innovations in response changing environmental and production requirements have included catalytic and tail gas processes which reduce sulphur emissions. 6 figs., 2 tabs.

  11. Commercialization of IGCC technology looks promising

    International Nuclear Information System (INIS)

    Smith, D.J.

    1992-01-01

    This paper reports that a major focus of the latest round of the U.S. Department of Energy's Clean Coal Technology Program was three large-scale, high-efficiency electricity generating projects which will rely on coal gasification rather than burning the coal directly. The three projects are: Toms Creek integrated gasification combined-cycle (IGCC) demonstration project. The aim of the project is to demonstrate improved coal-to-power efficiencies in an integrated gasification combined-cycle process. According to the DOE, the Toms Creek project will show that significant reductions in SO 2 and NO x emissions can be accomplished through the use of IGCC technology. On completion of the project, 107 MW of electric capacity will be added to the grid. Pinon Pine IGCC power project. The project's aim is to demonstrate that IGCC plants can be constructed at significantly lower capital costs, and with higher thermal efficiencies, than conventional power generation technologies. It will also demonstrate the effectiveness of hot gas cleanup for low-sulfur western coals. Wasbash River coal gasification repowering project

  12. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  13. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  14. Recent operating experience and improvement of commercial IGCC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-01

    IGCC has today reached a status where experience is available from first and second generation plants, built in the 1970s/1980s and in the 1990s respectively, as commercial-scale demonstration plants for coal-based applications. These plants feature variations on gasification technology and subsequent environmental controls and in operating them a number of technical and commercial lessons have been learned that will help to improve the next generation of IGCC projects. The report reviews and summarises the state-of-the-art and operating experience of several commercial IGCC plants worldwide, setting out the lessons learned and plans for future development embracing such issues as the changes or modifications to plant made to overcome the operational problems and to improve the reliability and availability of the plant. Since IGCC is considered a 'capture ready' technology for CO2 abatement, the current status with regard to the incorporation of carbon capture and storage systems (CCS) has been reviewed. Finally, the report outlines the issues associated with assessing the risks in commercialising IGCC plant.

  15. Dynamic modeling of IGCC power plants

    International Nuclear Information System (INIS)

    Casella, F.; Colonna, P.

    2012-01-01

    Integrated Gasification Combined Cycle (IGCC) power plants are an effective option to reduce emissions and implement carbon-dioxide sequestration. The combination of a very complex fuel-processing plant and a combined cycle power station leads to challenging problems as far as dynamic operation is concerned. Dynamic performance is extremely relevant because recent developments in the electricity market push toward an ever more flexible and varying operation of power plants. A dynamic model of the entire system and models of its sub-systems are indispensable tools in order to perform computer simulations aimed at process and control design. This paper presents the development of the lumped-parameters dynamic model of an entrained-flow gasifier, with special emphasis on the modeling approach. The model is implemented into software by means of the Modelica language and validated by comparison with one set of data related to the steady operation of the gasifier of the Buggenum power station in the Netherlands. Furthermore, in order to demonstrate the potential of the proposed modeling approach and the use of simulation for control design purposes, a complete model of an exemplary IGCC power plant, including its control system, has been developed, by re-using existing models of combined cycle plant components; the results of a load dispatch ramp simulation are presented and shortly discussed. - Highlights: ► The acausal dynamic model of an entrained gasifier has been developed. ► The model can be used to perform system optimization and control studies. ► The model has been validated using field data. ► Model use is illustrated with an example showing the transient of an IGCC plant.

  16. Efficiency enhancement in IGCC power plants with air-blown gasification and hot gas clean-up

    International Nuclear Information System (INIS)

    Giuffrida, Antonio; Romano, Matteo C.; Lozza, Giovanni

    2013-01-01

    Air-blown IGCC systems with hot fuel gas clean-up are investigated. In detail, the gas clean-up station consists of two reactors: in the first, the raw syngas exiting the gasifier and passed through high-temperature syngas coolers is desulfurized by means of a zinc oxide-based sorbent, whereas in the second the sulfided sorbent is duly regenerated. The hot fuel gas clean-up station releases H 2 S-free syngas, which is ready to fuel the combustion turbine after hot gas filtration, and a SO 2 -laden stream, which is successively treated in a wet scrubber. A thermodynamic analysis of two air-blown IGCC systems, the first with cold fuel gas clean-up and the second with hot fuel gas clean-up, both with a state-of-the-art combustion turbine as topping cycle, shows that it is possible to obtain a really attractive net efficiency (more than 51%) for the second system, with significant improvements in comparison with the first system. Nevertheless, higher efficiency is accomplished with a small reduction in the power output and no sensible efficiency improvements seem to be appreciated when the desulfurization temperature increases. Other IGCC systems, with an advanced 1500 °C-class combustion turbine as the result of technology improvements, are investigated as well, with efficiency as high as 53%. - Highlights: ► Hot fuel gas clean-up is a highly favorable technology for IGCC concepts. ► Significant IGCC efficiency improvements are possible with hot fuel gas clean-up. ► Size reductions of several IGCC components are possible. ► Higher desulfurization temperatures do not sensibly affect IGCC efficiency. ► IGCC efficiency as high as 53% is possible with a 1500°C-class combustion turbine

  17. RWE clean coal programme - IGCC power plant with CO{sub 2} capture & storage

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, K.-J.; Ewers, J.; Renzenbrink, W. [RWE Power AG, Essen (Germany)

    2007-07-01

    In early 2006, RWE Power announced it was building a 450 MW gross commercial IGCC power plant with carbon capture. This paper sums up the key results of the project development phase concerning the IGCC power plant and shows the basis for the feasibility phase of the project. 10 figs.

  18. Strategic thinking on IGCC development in China

    International Nuclear Information System (INIS)

    Liu Hengwei; Ni Weidou; Li Zheng; Ma Linwei

    2008-01-01

    With electricity demand growing at a torrid pace-about 15% per year, faster than any other country in the world-China is fast-tracking the construction of new generation facilities, about 80% of which are coal-fired. China's total capacity in the reference scenario of World Energy Outlook 2006 (WEO2006) released by the International Energy Agency (IEA) is projected to practically 3.4 times, from 442 GW in 2004 to 1496 GW in 2030, growing at 4.8% per year on average. The vast majority of this huge generation requirement will still be met through the construction of coal power plants. Because new coal power plants built today have a long life cycle and are not easy to upgrade the technologies involved, decisions made now will have a major impact on the coal utilization mode in the coming years. Thus, the future 20 years is the strategic opportunity period of the transition of conventional coal utilization. Because the Integrated Gasification Combined Cycle (IGCC) can supply electricity, liquid fuels, hydrogen and other chemicals if needed at low pollution level, and has the potential to make carbon capture and sequestration much easier and cheaper than traditional pulverized coal boiler power plants, it should be the strategic direction for China to meet the requirements of the energy and environmental challenges. This paper makes an overview of China's energy and environmental challenges and opportunities, and describes the IGCC technology. It discusses why China should develop IGCC. What are the foundations for China to develop IGCC? What are the rational driving forces to develop IGCC in China? What is the reasonable developing path of IGCC in China?

  19. Advanced IGCC/Hydrogen Gas Turbine Development

    Energy Technology Data Exchange (ETDEWEB)

    York, William [General Electric Company, Schenectady, NY (United States); Hughes, Michael [General Electric Company, Schenectady, NY (United States); Berry, Jonathan [General Electric Company, Schenectady, NY (United States); Russell, Tamara [General Electric Company, Schenectady, NY (United States); Lau, Y. C. [General Electric Company, Schenectady, NY (United States); Liu, Shan [General Electric Company, Schenectady, NY (United States); Arnett, Michael [General Electric Company, Schenectady, NY (United States); Peck, Arthur [General Electric Company, Schenectady, NY (United States); Tralshawala, Nilesh [General Electric Company, Schenectady, NY (United States); Weber, Joseph [General Electric Company, Schenectady, NY (United States); Benjamin, Marc [General Electric Company, Schenectady, NY (United States); Iduate, Michelle [General Electric Company, Schenectady, NY (United States); Kittleson, Jacob [General Electric Company, Schenectady, NY (United States); Garcia-Crespo, Andres [General Electric Company, Schenectady, NY (United States); Delvaux, John [General Electric Company, Schenectady, NY (United States); Casanova, Fernando [General Electric Company, Schenectady, NY (United States); Lacy, Ben [General Electric Company, Schenectady, NY (United States); Brzek, Brian [General Electric Company, Schenectady, NY (United States); Wolfe, Chris [General Electric Company, Schenectady, NY (United States); Palafox, Pepe [General Electric Company, Schenectady, NY (United States); Ding, Ben [General Electric Company, Schenectady, NY (United States); Badding, Bruce [General Electric Company, Schenectady, NY (United States); McDuffie, Dwayne [General Electric Company, Schenectady, NY (United States); Zemsky, Christine [General Electric Company, Schenectady, NY (United States)

    2015-07-30

    The objective of this program was to develop the technologies required for a fuel flexible (coal derived hydrogen or syngas) gas turbine for IGCC that met DOE turbine performance goals. The overall DOE Advanced Power System goal was to conduct the research and development (R&D) necessary to produce coal-based IGCC power systems with high efficiency, near-zero emissions, and competitive capital cost. To meet this goal, the DOE Fossil Energy Turbine Program had as an interim objective of 2 to 3 percentage points improvement in combined cycle (CC) efficiency. The final goal is 3 to 5 percentage points improvement in CC efficiency above the state of the art for CC turbines in IGCC applications at the time the program started. The efficiency goals were for NOx emissions of less than 2 ppm NOx (@15 % O2). As a result of the technologies developed under this program, the DOE goals were exceeded with a projected 8 point efficiency improvement. In addition, a new combustion technology was conceived of and developed to overcome the challenges of burning hydrogen and achieving the DOE’s NOx goal. This report also covers the developments under the ARRA-funded portion of the program that include gas turbine technology advancements for improvement in the efficiency, emissions, and cost performance of gas turbines for industrial applications with carbon capture and sequestration. Example applications could be cement plants, chemical plants, refineries, steel and aluminum plants, manufacturing facilities, etc. The DOE’s goal for more than 5 percentage point improvement in efficiency was met with cycle analyses performed for representative IGCC Steel Mill and IGCC Refinery applications. Technologies were developed in this program under the following areas: combustion, larger latter stage buckets, CMC and EBC, advanced materials and coatings, advanced configurations to reduce cooling, sealing and rotor purge flows, turbine aerodynamics, advanced sensors, advancements in first

  20. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  1. Pinon Pine power project nears start-up

    Energy Technology Data Exchange (ETDEWEB)

    Tatar, G.A. [Sierra Pacific Power Co., Reno, NV (United States); Gonzalez, M. [Foster Wheeler USA Corp., Clinton, NJ (United States); Mathur, G.K. [M.W. Kellogg Co., Houston, TX (United States)

    1997-12-31

    The IGCC facility being built by Sierra Pacific Power Company (SPPCo) at their Tracy Station in Nevada is one of three IGCC facilities being cost-shared by the US Department of Energy (DOE) under their Clean Coal Technology Program. The specific technology to be demonstrated in SPPCo`s Round Four Project, known as the Pinon Pine IGCC Project, includes the KRW air blown pressurized fluidized bed gasification process with hot gas cleanup coupled with a combined cycle facility based on a new GE 6FA gas turbine. Construction of the 100 MW IGCC facility began in February 1995 and the first firing of the gas turbine occurred as scheduled on August 15, 1996 with natural gas. Mechanical completion of the gasifier and other outstanding work is due in January 1997. Following the startup of the plant, the project will enter a 42 month operating and testing period during which low sulfur western and high sulfur eastern or midwestern coals will be processed.

  2. Feasibility studies to improve plant availability and reduce total installed cost in IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Kevin [General Electric Company, Houston, TX (United States); Anasti, William [General Electric Company, Houston, TX (United States); Fang, Yichuan [General Electric Company, Houston, TX (United States); Subramanyan, Karthik [General Electric Company, Houston, TX (United States); Leininger, Tom [General Electric Company, Houston, TX (United States); Zemsky, Christine [General Electric Company, Houston, TX (United States)

    2015-03-30

    The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6 – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.

  3. The reliability of integrated gasification combined cycle (IGCC) power generation units

    Energy Technology Data Exchange (ETDEWEB)

    Higman, C.; DellaVilla, S.; Steele, B. [Syngas Consultants Ltd. (United Kingdom)

    2006-07-01

    This paper presents two interlinked projects aimed at supporting the improvement of integrated gasification combined cycle (IGCC) reliability. The one project comprises the extension of SPS's existing ORAP (Operational Reliability Analysis Program) reliability, availability and maintainability (RAM) tracking technology from its existing base in natural gas open and combined cycle operations into IGCC. The other project is using the extended ORAP database to evaluate performance data from existing plants. The initial work has concentrated on evaluating public domain data on the performance of gasification based power and chemical plants. This is being followed up by plant interviews in some 20 plants to verify and expand the database on current performance. 23 refs., 8 figs., 2 tabs.

  4. Amine-based post-combustion CO2 capture in air-blown IGCC systems with cold and hot gas clean-up

    International Nuclear Information System (INIS)

    Giuffrida, A.; Bonalumi, D.; Lozza, G.

    2013-01-01

    Highlights: • Hot fuel gas clean-up is a very favorable technology for IGCC concepts. • IGCC net efficiency reduces to 41.5% when realizing post-combustion CO 2 capture. • Complex IGCC layouts are necessary if exhaust gas recirculation is realized. • IGCC performance does not significantly vary with exhaust gas recirculation. - Abstract: This paper focuses on the thermodynamic performance of air-blown IGCC systems with post-combustion CO 2 capture by chemical absorption. Two IGCC technologies are investigated in order to evaluate two different strategies of coal-derived gas clean-up. After outlining the layouts of two power plants, the first with conventional cold gas clean-up and the second with hot gas clean-up, attention is paid to the CO 2 capture station and to issues related to exhaust gas recirculation in combined cycles. The results highlight that significant improvements in IGCC performance are possible if hot coal-derived gas clean-up is realized before the syngas fuels the combustion turbine, so the energy cost of CO 2 removal in an amine-based post-combustion mode is less strong. In particular, IGCC net efficiency as high as 41.5% is calculated, showing an interesting potential if compared to the one of IGCC systems with pre-combustion CO 2 capture. Thermodynamic effects of exhaust gas recirculation are investigated as well, even though IGCC performance does not significantly vary against a more complicated plant layout

  5. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  6. Heat integration and analysis of decarbonised IGCC sites

    Energy Technology Data Exchange (ETDEWEB)

    Ng, K.S.; Lopez, Y.; Campbell, G.M.; Sadhukhan, J. [University of Manchester, Manchester (United Kingdom). School of Chemical Engineering & Analytical Science

    2010-02-15

    Integrated gasification combined cycle (IGCC) power generation systems have become of interest due to their high combined heat and power (CHP) generation efficiency and flexibility to include carbon capture and storage (CCS) in order to reduce CO{sub 2} emissions. However, IGCC's biggest challenge is its high cost of energy production. In this study, decarbonised coal IGCC sites integrated with CCS have been investigated for heat integration and economic value analyses. It is envisaged that the high energy production cost of an IGCC site can be offset by maximising site-wide heat recovery and thereby improving the cost of electricity (COE) of CHP generation. Strategies for designing high efficiency CHP networks have been proposed based on thermodynamic heuristics and pinch theory. Additionally, a comprehensive methodology to determine the COE from a process site has been developed. In this work, we have established thermodynamic and economic comparisons between IGCC sites with and without CCS and a trade-off between the degree of decarbonisation and the COE from the heat integrated IGCC sites. The results show that the COE from the heat integrated decarbonised IGCC sites is significantly lower compared to IGCC sites without heat integration making application of CCS in IGCC sites economically competitive.

  7. Advanced IGCC-Hypogen concepts for a developing hydrogen market

    Energy Technology Data Exchange (ETDEWEB)

    Starr, F.; Cormos, C.-C.; Tzimas, E.; Brown, A. [European Commission, Petten (Netherlands). DG Joint Research Centre, Institute for Energy

    2007-07-01

    With FP6 the EU is funding a project called 'Dynamis' which aims to design plants to generate electricity, plus a limited amount of hydrogen from fossil fuels, in which the CO{sub 2} is captured and stored underground. Such plants have been characterised as being of the 'HYPOGEN' type since they generate both hydrogen and electric power. As the hydrogen market develops IGCC-Hypogen based systems will need to produce much greater amounts of hydrogen. It is also desirable that such plants should be able to vary the proportion of hydrogen-to-electricity. This will enable IGCC-Hypogen plants to load follow and two-shift as electricity demand from the grid changes. Such variations in power output are not always practical with existing designs of electricity-only IGCCs. This paper reviews the technical issues involved in providing a high-flexibility IGCC-Hypogen plant. Three such concepts are discussed (1) very limited flexibility in which the changes from a fixed hydrogen-electricity ratio concept are minor, (2) moderate level of flexibility in which the limit is imposed by the CCGT gas turbine turndown (3) complete flexibility, the plant being able produce the energy as all-electricity or all-hydrogen. 9 refs., 2 figs., 1 tab.

  8. IGCC - fuel-flexible technology for the future

    Energy Technology Data Exchange (ETDEWEB)

    Karg, J.; Hannemann, F. [Siemens AG Power Generation, Erlangen (Germany)

    2004-07-01

    According to IEA's World Energy Investment Outlook 2003 the electricity sector will dominate with about 60% of the total investment requirements expected until 2030 for worldwide energy-supply infrastructure. Around 45% of the capital needed for the electricity sector will be for power generation. The investment will be needed for capacity additions and to replace existing older facilities. According to the estimates the global primary energy demand is projected to grow by two thirds over the next three decades and electricity demand is expected to double by 2030. The natural gas for power generation is projected to increase significantly, but coal will remain the largest source of electricity generation throughout the projection period. These trends must be seen against the background that environmental regulations, are becoming tighter, and that environmental legislation will increasingly address greenhouse gas emissions. The necessity for more efficient use of primary energies in combination with more stringent environmental regulations for fossil-fuelled power plants therefore pushes concepts with increased efficiencies and reduced CO{sub 2} emissions, respectively. Since significant reduction of CO{sub 2} emissions cannot only be achieved via increased efficiencies or application of fuels with low carbon content, CO{sub 2} removal options also need to be considered for future power plant configurations. Considering this, IGCC is again one of the most promising solutions which are of relevance in this context. However, these new IGCC applications require further overall a plant concept and component development efforts. One essential step for performance improvement of future IGCC applications is to further develop syngas capabilities of advanced gas turbines, thereby considering the experience and lessons learned from operational plants. 11 refs., 7 figs., 5 tabs.

  9. IGCC based on proven technology developing towards 50% efficiency mark

    Energy Technology Data Exchange (ETDEWEB)

    Goudappel, E.; Berkhout, M. [Jacobs Consultancy, Leiden (Netherlands)

    2006-07-01

    In this paper the achievements made over the last 10 years in terms of reliability, load following and efficiency improvement potential at the Buggenum IGCC plant, are presented. Also the air side heat integration and its pros and cons are discussed. Additionally future business opportunities adjacent to the power production itself and the view on coal gasification in the near future are provided. The results are discussed and it is shown that with 'proven' gasifier and gas treatment technology, overall efficiency exceeding 47% (LHV basis) can be reached. It puts this technical potential in perspective and describes the view on interesting business opportunities around IGCC projects. 5 figs., 3 tabs.

  10. The installation IGCC power plans in the petroleum refinement: international experiences and lessons for Mexico; La instalacion de plantas IGCC en la refinacion de petroleo: experiencias internacionales y lecciones para Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez, Joel [Ecole du Petrole et des Moteurs, Institut Franzais du Petrole, (France)

    2004-06-15

    In this work, are presented the technical and economic elements of the international experience for the installation of IGCC power plants in the petroleum refinement and the lessons for Mexico in the installation of this technology in PEMEX Refinacion are analyzed. The construction of IGCC power plants in the petroleum refinement has grown 14.3 % at worldwide level as of 1996, in which there was already an installed capacity of 160 MW. At the end of 2003 an installed capacity of 2,500 MW was reached. The growth in the installation of IGCC power plants fundamentally appears in Europe, being Italy and Spain leader countries in the construction of this technology in the petroleum refinement. However, countries like Holland, Japan, Singapore and the United States count on IGCC power plants for electricity and hydrogen generation, which take advantage of low value fuels such as vacuum tower residues, petroleum coke, asphalt, liquid fuels, among others. In Mexico, the installation IGCC power plants in the petroleum refinement is null, nevertheless Petroleos Mexicanos counts with the approval of the government for the installation of cogeneration power plants in its facilities. This approval would allow PEMEX to carry out projects for the installation IGCC power plants, specifically in PEMEX Refinacion, for the generation of electricity and hydrogen from the advantage of heavy residues of low economic value. The opportunity that the installation IGCC power plants in the petroleum refinement offers is directed towards the commercialization of the electricity and hydrogen, which would impel PEMEX Refinacion to enter the competition of the electrical market in Mexico. [Spanish] En este trabajo, se presentan los elementos tecnicos y economicos de la experiencia internacional para la instalacion de plantas IGCC en la refinacion de petroleo y se analizan las lecciones para Mexico en la instalacion de esta tecnologia en PEMEX Refinacion. La construccion de plantas IGCC en la

  11. Api Energia IGCC plant is fully integrated with refinery

    Energy Technology Data Exchange (ETDEWEB)

    Del Bravo, R. [api Energia, Rome (Italy); Trifilo, R. [ABB Sadelmi, Milan (Italy); Chiantore, P.V. [api anonima petroli Italiania Spa, Rome (Italy); Starace, F. [ABB Power Generation, Baden (Switzerland); O`Keefe, L.F. [Texico, White Plains (United States)

    1998-06-01

    The api Energia integrated gasification combined cycle (IGCC) plant being built at Falconara Marittima, on Italy`s Adriatic coast, is one of the three IGCC plants under construction in Italy following the liberalization of the electricity production sector. The plant will take 59.2 t/h of high sulphur heavy oil produced by the Falconara refinery, convert it to syngas and use the gas to generate 280 MW of electricity, plus steam and other gases for use in the refinery. The IGCC plant will be highly integrated into the refining process, with a large number of interchanges between the IGCC unit and the rest of the refinery. (author)

  12. Market potential of IGCC for domestic power production

    International Nuclear Information System (INIS)

    Gray, D.; Tomlinson, G.; Hawk, E.; Maskew, J.

    1999-01-01

    Mitretek Systems and CONSOL Inc. have completed the first phase of a market potential study for Integrated Coal Gasification Combined Cycle (IGCC) domestic power production. The U. S. Department of Energy (DOE) funded this study. The objective of this study is to provide DOE with data to estimate the future domestic market potential of IGCC for electricity generation. Major drivers in this study are the state of technology development, feedstock costs, environmental control costs, demand growth, and dispatchability. This study examines IGCC potential for baseload power production in the Northeast U. S., an important market area by virtue of existing coal infrastructure and proximity to coal producing regions. IGCC market potential was examined for two levels of technology development as a function of natural gas price and carbon tax. This paper discusses the results of this study, including the levels of performance and cost necessary to insure competitiveness with natural gas combined cycle plants

  13. The United States of America and the People`s Republic of China experts report on integrated gasification combined-cycle technology (IGCC)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    A report written by the leading US and Chinese experts in Integrated Gasification Combined Cycle (IGCC) power plants, intended for high level decision makers, may greatly accelerate the development of an IGCC demonstration project in the People`s Republic of China (PRC). The potential market for IGCC systems in China and the competitiveness of IGCC technology with other clean coal options for China have been analyzed in the report. Such information will be useful not only to the Chinese government but also to US vendors and companies. The goal of this report is to analyze the energy supply structure of China, China`s energy and environmental protection demand, and the potential market in China in order to make a justified and reasonable assessment on feasibility of the transfer of US Clean Coal Technologies to China. The Expert Report was developed and written by the joint US/PRC IGCC experts and will be presented to the State Planning Commission (SPC) by the President of the CAS to ensure consideration of the importance of IGCC for future PRC power production.

  14. Modeling and assessment of future IGCC plant concepts with CO{sub 2} capture; Simulation und Bewertung zukuenftiger IGCC-Kraftwerkskonzepte mit CO{sub 2}-Abtrennung

    Energy Technology Data Exchange (ETDEWEB)

    Kunze, Christian A.

    2012-07-13

    The thesis focuses on the assessment of efficiency potential of future IGCC plants with CO{sub 2} capture. Starting point is a comprehensive analysis (thermodynamic, economic and exergy) of a state of the art IGCC. Additionally, five future IGCC concepts are proposed and evaluated for their efficiency potential in the mid- and long-term. The concepts showed significantly higher efficiencies up to approximately 60% and enable an almost CO{sub 2}-free operation.

  15. Thermodynamic assessment of IGCC power plants with hot fuel gas desulfurization

    International Nuclear Information System (INIS)

    Giuffrida, Antonio; Romano, Matteo C.; Lozza, Giovanni G.

    2010-01-01

    In IGCC power plants, hot gas desulfurization (HGD) represents an attractive solution to simplify syngas treatments and to improve the efficiency, potentially reducing the final cost of electricity. In the present study, the various consequences of the introduction of a HGD station in the power plant are discussed and evaluated, in comparison with conventional near-ambient temperature clean-up. Attention is paid to the potential improvements of the overall energy balance of the complete power station, along with the requirements of the sorbent regeneration process, to the influence of the desulfurization temperature and to the different solutions needed to control the NO x emissions (altered by the presence of HGD). The net performance of complete IGCC power plants (with HGD or with conventional desulfurization) were predicted, with reference to status-of-the-art solutions based on an entrained flow, dry-feed, oxygen-blown gasifier and on an advanced, FB-class combined cycle. The net efficiency experiences about 2.5% point improvement with HGD, even if a small reduction in the power output was predicted, when using the same combustion turbine. An exhaustive sensitivity analysis was carried out to evaluate the effects of different working conditions at the HGD station, e.g. desulfurization temperature and oxygen content in the gaseous stream for sorbent regeneration. According to the obtained results, these parameters have a weak influence on the efficiency. In particular, a very elevated desulfurization temperature (above 400-500 o C) does not provide decisive thermodynamic advantages. Therefore, the HGD unit optimization can be driven by technical and economical aspects and by emission abatement requirements. For instance, utilization of nitrogen for HGD sorbent regeneration (rather than for syngas dilution) and higher fuel temperature may improve the NO formation. Hence, different strategies to achieve acceptable NO x emissions (e.g. steam dilution) and their

  16. Integrated assessment of IGCC power generation technology with carbon capture and storage (CCS)

    International Nuclear Information System (INIS)

    Cormos, Calin-Cristian

    2012-01-01

    IGCC (Integrated Gasification Combined Cycle) is a power generation technology in which the solid feedstock is partially oxidized with oxygen and steam to produce syngas. In a conventional IGCC design without carbon capture, the syngas is purified for dust and hydrogen sulphide removal and then it is sent to a CCGT (Combined Cycle Gas Turbine) for power generation. CCS (Carbon capture and storage) technologies are expected to play a significant role in the coming decades for reducing the greenhouse gas emissions. IGCC is one of the power generation technologies having the highest potential to capture CO 2 with low penalties in term of plant energy efficiency, capital and operational costs. This paper investigates the most important techno-economic and environmental indicators (e.g. power output, ancillary consumption, energy efficiency, CW consumption, normalised mass and energy balances and plant construction materials, capital and O and M (operational and maintenance) costs, specific CO 2 emissions, cost of electricity, CO 2 removal and avoidance costs etc.) for IGCC with CCS. Coal-based IGCC cases produce around 400–450 MW net electricity with 90% carbon capture rate. Similar IGCC plants without CCS were presented as references. Future IGCC developments for energy vectors poly-generation were also presented. -- Highlights: ► Techno-economical evaluations of coal-based IGCC power generation with CCS. ► Model development for capital, O and M, CO 2 capture costs and cash flow estimations. ► Technical and economic investigations of key plant design characteristics. ► Evaluations of carbon capture options for IGCC power generation technology.

  17. Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth A. Yackly

    2005-12-01

    The ''Enabling & Information Technology To Increase RAM for Advanced Powerplants'' program, by DOE request, was re-directed, de-scoped to two tasks, shortened to a 2-year period of performance, and refocused to develop, validate and accelerate the commercial use of enabling materials technologies and sensors for coal/IGCC powerplants. The new program was re-titled ''Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants''. This final report summarizes the work accomplished from March 1, 2003 to March 31, 2004 on the four original tasks, and the work accomplished from April 1, 2004 to July 30, 2005 on the two re-directed tasks. The program Tasks are summarized below: Task 1--IGCC Environmental Impact on high Temperature Materials: The first task was refocused to address IGCC environmental impacts on high temperature materials used in gas turbines. This task screened material performance and quantified the effects of high temperature erosion and corrosion of hot gas path materials in coal/IGCC applications. The materials of interest included those in current service as well as advanced, high-performance alloys and coatings. Task 2--Material In-Service Health Monitoring: The second task was reduced in scope to demonstrate new technologies to determine the inservice health of advanced technology coal/IGCC powerplants. The task focused on two critical sensing needs for advanced coal/IGCC gas turbines: (1) Fuel Quality Sensor to rapidly determine the fuel heating value for more precise control of the gas turbine, and detection of fuel impurities that could lead to rapid component degradation. (2) Infra-Red Pyrometer to continuously measure the temperature of gas turbine buckets, nozzles, and combustor hardware. Task 3--Advanced Methods for Combustion Monitoring and Control: The third task was originally to develop and validate advanced monitoring and control methods for coal/IGCC gas

  18. Puertollano IGCC plant. Present position and future competitiveness

    Energy Technology Data Exchange (ETDEWEB)

    Pedro Casero; Francisco Garcia-Pena

    2006-07-01

    This paper discusses the current status of the Puertollano 350 MW IGCC demonstration power plant in Spain. The experience provided by the operation of this plant during the last years is described, focussing on the core systems of the plant (gasifier, gas cleaning and gas turbines). Bottlenecks and weak points related to these systems are identified, along with the improvements. The production of hydrogen from coal at an IGCC plant is also discussed. 9 figs., 2 tabs.

  19. Recycling of residual IGCC slags and their benefits as degreasers in ceramics.

    Science.gov (United States)

    Iglesias Martín, I; Acosta Echeverría, A; García-Romero, E

    2013-11-15

    This work studies the evolution of IGCC slag grains within a ceramic matrix fired at different temperatures to investigate the effect of using IGCC slag as a degreaser. Pressed ceramic specimens from two clay mixtures are used in this study. The M1 mixture is composed of standard clays, whereas the M2 mixture is composed of the same clay mixture as M1 mixture but contains 15% by weight IGCC slag. The amount of IGCC slag added coincides with the amount of slag typically used as a degreaser in the ceramic industry. Specimens are fired at 950 °C, 1000 °C, 1050 °C, 1100 °C and 1150 °C. The mineralogical composition and the IGCC slag grain shape within the ceramic matrix are determined by X-ray diffraction, polarized light microscopy and scanning electron microscopy. The results reveal that the surface of the slag grains is welded to the ceramic matrix while the quartz grains are separated, which causes increased water absorption and reduces the mechanical strength. IGCC slag, however, reduces water absorption. This behaviour is due to the softening temperature of the slag. This property is quite important from an industrial viewpoint because IGCC slag can serve as an alternative to traditional degreasing agents in the ceramic building industry. Additionally, using IGCC slag allows for the transformation of waste into a secondary raw material, thereby avoiding disposal at landfills; moreover, these industrial wastes are made inert and improve the properties of ceramics. Copyright © 2013 Elsevier Ltd. All rights reserved.

  20. Biomass IGCC

    Energy Technology Data Exchange (ETDEWEB)

    Salo, K; Keraenen, H [Enviropower Inc., Espoo (Finland)

    1997-12-31

    Enviropower Inc. is developing a modern power plant concept based on pressurised fluidized-bed gasification and gas turbine combined cycle (IGCC). The process is capable of maximising the electricity production with a variety of solid fuels - different biomass and coal types - mixed or separately. The development work is conducted on many levels. These and demonstration efforts are highlighted in this article. The feasibility of a pressurised gasification based processes compared to competing technologies in different applications is discussed. The potential of power production from biomass is also reviewed. (orig.) 4 refs.

  1. Biomass IGCC

    Energy Technology Data Exchange (ETDEWEB)

    Salo, K.; Keraenen, H. [Enviropower Inc., Espoo (Finland)

    1996-12-31

    Enviropower Inc. is developing a modern power plant concept based on pressurised fluidized-bed gasification and gas turbine combined cycle (IGCC). The process is capable of maximising the electricity production with a variety of solid fuels - different biomass and coal types - mixed or separately. The development work is conducted on many levels. These and demonstration efforts are highlighted in this article. The feasibility of a pressurised gasification based processes compared to competing technologies in different applications is discussed. The potential of power production from biomass is also reviewed. (orig.) 4 refs.

  2. IGCC technology and demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Palonen, J [A. Ahlstrom Corporation, Karhula (Finland). Hans Ahlstrom Lab.; Lundqvist, R G [A. Ahlstrom Corporation, Helsinki (Finland); Staahl, K [Sydkraft AB, Malmoe (Sweden)

    1997-12-31

    Future energy production will be performed by advanced technologies that are more efficient, more environmentally friendly and less expensive than current technologies. Integrated gasification combined cycle (IGCC) power plants have been proposed as one of these systems. Utilising biofuels in future energy production will also be emphasised since this lowers substantially carbon dioxide emissions into the atmosphere due to the fact that biomass is a renewable form of energy. Combining advanced technology and biomass utilisation is for this reason something that should and will be encouraged. A. Ahlstrom Corporation of Finland and Sydkraft AB of Sweden have as one part of company strategies adopted this approach for the future. The companies have joined their resources in developing a biomass-based IGCC system with the gasification part based on pressurised circulating fluidized-bed technology. With this kind of technology electrical efficiency can be substantially increased compared to conventional power plants. As a first concrete step, a decision has been made to build a demonstration plant. This plant, located in Vaernamo, Sweden, has already been built and is now in commissioning and demonstration stage. The system comprises a fuel drying plant, a pressurised CFB gasifier with gas cooling and cleaning, a gas turbine, a waste heat recovery unit and a steam turbine. The plant is the first in the world where the integration of a pressurised gasifier with a gas turbine will be realised utilising a low calorific gas produced from biomass. The capacity of the Vaernamo plant is 6 MW of electricity and 9 MW of district heating. Technology development is in progress for design of plants of sizes from 20 to 120 MWe. The paper describes the Bioflow IGCC system, the Vaernamo demonstration plant and experiences from the commissioning and demonstration stages. (orig.)

  3. IGCC technology and demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Palonen, J. [A. Ahlstrom Corporation, Karhula (Finland). Hans Ahlstrom Lab.; Lundqvist, R.G. [A. Ahlstrom Corporation, Helsinki (Finland); Staahl, K. [Sydkraft AB, Malmoe (Sweden)

    1996-12-31

    Future energy production will be performed by advanced technologies that are more efficient, more environmentally friendly and less expensive than current technologies. Integrated gasification combined cycle (IGCC) power plants have been proposed as one of these systems. Utilising biofuels in future energy production will also be emphasised since this lowers substantially carbon dioxide emissions into the atmosphere due to the fact that biomass is a renewable form of energy. Combining advanced technology and biomass utilisation is for this reason something that should and will be encouraged. A. Ahlstrom Corporation of Finland and Sydkraft AB of Sweden have as one part of company strategies adopted this approach for the future. The companies have joined their resources in developing a biomass-based IGCC system with the gasification part based on pressurised circulating fluidized-bed technology. With this kind of technology electrical efficiency can be substantially increased compared to conventional power plants. As a first concrete step, a decision has been made to build a demonstration plant. This plant, located in Vaernamo, Sweden, has already been built and is now in commissioning and demonstration stage. The system comprises a fuel drying plant, a pressurised CFB gasifier with gas cooling and cleaning, a gas turbine, a waste heat recovery unit and a steam turbine. The plant is the first in the world where the integration of a pressurised gasifier with a gas turbine will be realised utilising a low calorific gas produced from biomass. The capacity of the Vaernamo plant is 6 MW of electricity and 9 MW of district heating. Technology development is in progress for design of plants of sizes from 20 to 120 MWe. The paper describes the Bioflow IGCC system, the Vaernamo demonstration plant and experiences from the commissioning and demonstration stages. (orig.)

  4. Different scenarios to reduce greenhouse gas emissions of thermal power stations in Canada

    International Nuclear Information System (INIS)

    Zabihian, F.; Fung, A.S.

    2009-01-01

    The purpose of this paper is to examine greenhouse gas (GHG) emission reduction potentials in the Canadian electricity generation sector through fuel switching and the adoption of advanced power generation systems. To achieve this purpose, six different scenarios were introduced. In the first scenario existing power stations' fuel was switched to natural gas. Existing power plants were replaced by natural gas combined cycle (NGCC), integrated gasification combined cycle (IGCC), solid oxide fuel cell (SOFC), hybrid SOFC, and SOFC-IGCC hybrid power stations in scenarios number 2 to 6, respectively. (author)

  5. Assessment of oxy-fuel, pre- and post-combustion-based carbon capture for future IGCC plants

    International Nuclear Information System (INIS)

    Kunze, Christian; Spliethoff, Hartmut

    2012-01-01

    Highlights: ► Hot gas cleanup is a highly favorable technology for all selected IGCC concepts. ► Proposed high pressure IGCC with membrane reactor enables direct CO 2 condensation. ► IGCC with OTM and carbonate looping enable significant synergy effects. ► Combining IGCC and oxy-fuel is technically challenging but energetically favorable. ► All selected IGCC concepts are able to realize CO 2 capture rates up to 99%. -- Abstract: Environmental damage due to the emission of greenhouse gases from conventional coal-based power plants is a growing concern. Various carbon capture strategies to minimize CO 2 emissions are currently being investigated. Unfortunately, the efficiency drop due to de-carbonization is still significant and the capture rate is limited. Therefore three future hard coal IGCC concepts are assessed here, applying emerging technologies and various carbon capture approaches. The advanced pre-combustion capture concept is based on hot gas clean-up, membrane-enhanced CO conversion and direct CO 2 condensation. The concept reached a net efficiency of 45.1% (LHV), representing an improvement of 6.46% compared to the conventional IGCC base case. The second IGCC concept, based on post-combustion capture via calcination–carbonation loops, hot gas clean-up and oxygen membranes, showed a net efficiency of 45.87% (LHV). The third IGCC concept applies hot gas clean-up and combustion of the unconverted fuel gas using pure oxygen. The oxygen is supplied by an integrated oxygen membrane. The combination of IGCC and oxy-fuel process reached a net efficiency of 45.74% (LHV). In addition to their increased efficiency, all of the concepts showed significantly improved carbon capture rates up to 99%, resulting in virtually carbon-free fossil power plants.

  6. Demonstration of IGCC features - plant integration and syngas combustion

    Energy Technology Data Exchange (ETDEWEB)

    Hannemann, F.; Huth, M.; Karg, J.; Schiffers, U. [Siemens AG Power Generation (KWU), Erlanger/Muelheim (Germany)

    2000-07-01

    Siemens is involved in three IGCC plants in Europe that are currently in operation. Against the background of the Puertollano and Buggenum plants, some of the specific new features of fully integrated IGCC power plants are discussed, including: requirements and design features of the gas turbine syngas supply system; gas turbine operating experience with air extraction for the air separation unit from the gas turbine air compressor; and design requirements and operational features of the combustion system. 7 refs., 17 figs., 1 tab.

  7. Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in COAL IGCC Powerplants

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth A. Yackly

    2004-09-30

    The ''Enabling & Information Technology To Increase RAM for Advanced Powerplants'' program, by DOE request, has been re-directed, de-scoped to two tasks, shortened to a 2-year period of performance, and refocused to develop, validate and accelerate the commercial use of enabling materials technologies and sensors for Coal IGCC powerplants. The new program has been re-titled as ''Enabling Technology for Monitoring & Predicting Gas Turbine Health & Performance in IGCC Powerplants'' to better match the new scope. This technical progress report summarizes the work accomplished in the reporting period April 1, 2004 to August 31, 2004 on the revised Re-Directed and De-Scoped program activity. The program Tasks are: Task 1--IGCC Environmental Impact on high Temperature Materials: This first materials task has been refocused to address Coal IGCC environmental impacts on high temperature materials use in gas turbines and remains in the program. This task will screen material performance and quantify the effects of high temperature erosion and corrosion of hot gas path materials in Coal IGCC applications. The materials of interest will include those in current service as well as advanced, high-performance alloys and coatings. Task 2--Material In-Service Health Monitoring: This second task develops and demonstrates new sensor technologies to determine the in-service health of advanced technology Coal IGCC powerplants, and remains in the program with a reduced scope. Its focus is now on only two critical sensor need areas for advanced Coal IGCC gas turbines: (1) Fuel Quality Sensor for detection of fuel impurities that could lead to rapid component degradation, and a Fuel Heating Value Sensor to rapidly determine the fuel heating value for more precise control of the gas turbine, and (2) Infra-Red Pyrometer to continuously measure the temperature of gas turbine buckets, nozzles, and combustor hardware.

  8. Air toxics emissions from an IGCC process

    Energy Technology Data Exchange (ETDEWEB)

    Mojtahedi, W.; Norrbacka, P. [Enviropower Inc., Espoo (Finland); Hinderson, A. [Vattenfall (Sweden); Rosenberg, R.; Zilliacus, R.; Kurkela, E.; Nieminen, M. [VTT Energy, Espoo (Finland); Hoffren, H. [IVO International Oy, Vantaa (Finland)

    1996-12-01

    The so-called simplified coal gasification combined cycle process, incorporating air gasification and hot gas cleanup, promises high power generation efficiency in an environmentally acceptable manner. Increasingly more stringent environmental regulations have focused attention on the emissions of not only SO{sub 2} and NO{sub x} but also on the so-called air toxics which include a number of toxic trace elements. As result of recent amendments to the United States Clean Air Act, IGCC emissions of eleven trace elements: antimony, arsenic, beryllium, cadmium, chromium, cobalt, lead, manganese, mercury, nickel, selenium - as well as the radionuclides uranium and thorium may be regulated. Similarly, air missions standards in Europe include a limit of 0.05 mg Nm{sup 3} for mercury and cadmium and 1.0 3/Nm{sup 3} for other class I trace elements. A suitable sampling/measuring system has been developed in this project (in cooperation with Imatran Voima Oy, Electric Power Research Institute (EPRI) and Radian Cooperation) which will be used in the pressurized gasification tests. This will enable an accurate measurement of the volatilized trace element species, at high temperature and pressure, which may be found in the vapour phase. Models are being developed that can be used to determine not only the chemical equilibrium composition of gaseous, liquid and solid phases, but also possible interactions of the gaseous species with aerosol particles and surfaces, These should be used to more accurately assess the impact of the toxic trace metals emitted from the simplified IGCC system

  9. Commercial gasifier for IGCC applications study report

    Energy Technology Data Exchange (ETDEWEB)

    Notestein, J.E.

    1990-06-01

    This was a scoping-level study to identify and characterize the design features of fixed-bed gasifiers appearing most important for a gasifier that was to be (1) potentially commercially attractive, and (2) specifically intended for us in integrated coal gasification/combined-cycle (IGCC) applications. It also performed comparative analyses on the impact or value of these design features and on performance characteristics options of the whole IGCC system since cost, efficiency, environmental traits, and operability -- on a system basis -- are what is really important. The study also reviewed and evaluated existing gasifier designs, produced a conceptual-level gasifier design, and generated a moderately advanced system configuration that was utilized as the reference framework for the comparative analyses. In addition, technical issues and knowledge gaps were defined. 70 figs., 31 tabs.

  10. Exergoeconomic evaluation of a KRW-based IGCC power plant

    International Nuclear Information System (INIS)

    Tsatsavonis, G.; Lin, L.; TawFik, T.; Gallaspy, D.T.

    1991-01-01

    This paper reports on a study supported by the US Department of Energy, in which several design configurations of Kellogg-Rust-Westinghouse (KRW)-based Integrated Gasification-Combined-Cycle (IGCC) power plants were developed. One of these configurations was analyzed from the exergoeconomic (thermoeconomic) viewpoint. The detailed exergoeconomic evaluation identified several changes for improving the cost effectiveness of this IGCC design configuration. Based on the cost information supplied by the M.W. Kellogg Company, an attempt was made to calculate the economically optimal exergetic efficiency for some of the most important plant components. This information is currently used in plant optimization studies

  11. Water-gas shift (WGS) Operation of Pre-combustion CO2 Capture Pilot Plant at the Buggenum IGCC

    NARCIS (Netherlands)

    Van Dijk, H.A.J.; Damen, K.; Makkee, M.; Trapp, C.

    2014-01-01

    In the Nuon/Vattenfall CO2 Catch-up project, a pre-combustion CO2 capture pilot plant was built and operated at the Buggenum IGCC power plant, the Netherlands. The pilot consist of sweet water-gas shift, physical CO2 absorption and CO2 compression. The technology performance was verified and

  12. Briefing Book, Interagency Geothermal Coordinating Council (IGCC) Meeting of April 28, 1988

    Energy Technology Data Exchange (ETDEWEB)

    None

    1988-04-28

    The IGCC of the U.S. government was created under the intent of Public Law 93-410 (1974) to serve as a forum for the discussion of Federal plans, activities, and policies that are related to or impact on geothermal energy. Eight Federal Departments were represented on the IGCC at the time of this meeting. The main presentations in this report were on: Department of Energy Geothermal R&D Program, the Ormat binary power plant at East Mesa, CA, Potential for direct use of geothermal at Defense bases in U.S. and overseas, Department of Defense Geothermal Program at China Lake, and Status of the U.S. Geothermal Industry. The IGCC briefing books and minutes provide a historical snapshot of what development and impact issues were important at various time. (DJE 2005)

  13. Developments in the pre-combustion CO2 capture pilot plant at the Buggenum IGCC

    NARCIS (Netherlands)

    Damen, K.; Gnutek, R.; Kaptein, J.; Nannan, N.R.; Oyarzun, B.; Trapp, C.; Colonna, P.; Van Dijk, E.; Gross, J.; Bardow, A.

    2011-01-01

    N.V. Nuon (part of the Vattenfall Group) operates an IGCC in Buggenum and is developing a multi-fuel IGCC with CO2 capture and storage (Nuon Magnum) in Eemshaven, the Netherlands. In order to prepare for large-scale application of CO2 capture and storage, a CO2 capture pilot plant is constructed at

  14. A comparison of improved power plant technologies on lignite with (PFBC) and (IGCC) cycles

    International Nuclear Information System (INIS)

    Cherepnalkovski, Ilija

    1997-01-01

    Technologies and process diagrams descriptions for PFBC (Pressurised Fluidized Bed Combustion) and IGCC (Integrated Gasification Combined Cycle) are presented as for improved cycles with modern clean coal technologies, the most popular currently. A special attention is paid to the possibilities for Macedonian lignites use on the power plants with PFBC and IGCC cycles. The comparison of the above mention technologies has been done particularly on the desulfurization, NO x reduction, ash elimination and its use in the building and construction industries. A comparison between the power plants with PFBC and IGCC cycles is made by the following criteria: cycle efficiency, desulfurization and nitrogen oxides reduction, power plant complexity and their cost, as well as plant reliability. (Author)

  15. CO2 control technology effects on IGCC plant performance and cost

    International Nuclear Information System (INIS)

    Chen Chao; Rubin, Edward S.

    2009-01-01

    As part of the USDOE's Carbon Sequestration Program, an integrated modeling framework has been developed to evaluate the performance and cost of alternative carbon capture and storage (CCS) technologies for fossil-fueled power plants in the context of multi-pollutant control requirements. This paper uses the newly developed model of an integrated gasification combined cycle (IGCC) plant to analyze the effects of adding CCS to an IGCC system employing a GE quench gasifier with water gas shift reactors and a Selexol system for CO 2 capture. Parameters of interest include the effects on plant performance and cost of varying the CO 2 removal efficiency, the quality and cost of coal, and selected other factors affecting overall plant performance and cost. The stochastic simulation capability of the model is also used to illustrate the effect of uncertainties or variability in key process and cost parameters. The potential for advanced oxygen production and gas turbine technologies to reduce the cost and environmental impacts of IGCC with CCS is also analyzed

  16. IGCC crosses the threshold

    Energy Technology Data Exchange (ETDEWEB)

    Broderick, J E

    1986-07-01

    This paper describes the development of the Texaco Coal Gasification Process (TCGP), the first of the advanced gasification processes to become commercialized. The utilization of this process in various demonstration and commercial plants is described. The design of the Cool Water integrated gasification combined cycle (IGCC) plant in California is discussed in some detail. This plant has been operating successfully since June 1984, and has demonstrated that the Texaco gasification technology for electric power generation is commercially viable, can use many different feedstocks, has substantial efficiency growth potential, can provide competitively lower cost electric power, and offers vastly superior environmental performance.

  17. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  18. Dynamic simulation of operating cases and malfunctions of an IGCC power plant system

    Energy Technology Data Exchange (ETDEWEB)

    Koch, I.; Hannemann, F. [Siemens AG, Power Generation (KWU), Erlangen (Germany); Hoffmann, U. [Technische Univ. Clausthal, Clausthal-Zellerfeld (Germany). Inst. fuer Chemische Verfahrenstechnik

    1999-07-01

    Fully integrated IGCC plants consist of several units. This novel integration of various plant systems places stiff new requirements on power plant design, as prediction of operating and faulted behavior is made more difficult by many different interactions. This is especially the case for the gas turbine fuel system in an IGCC power plant, as it affects and is affected by all of the other major plant systems. (orig.)

  19. Shippingport Station Decommissioning Project: overview and justification

    International Nuclear Information System (INIS)

    Coffman, F.E.

    1984-01-01

    The purpose of this booklet is to brief the reader on the Shippingport Station Decommissioning Project and to summarize the benefits of funding the project in FY 1984. Background information on the station and the decommissioning project is provided in this section of the booklet; the need for a reactor decommissining demonstration is discussed in the next section; and a summary of how the Shippingport Station Decommissioning Project (SSDP) provides the needed demonstration is provided in the final section

  20. Pushing forward IGCC and CO{sub 2}-free power plant technology at Siemens

    Energy Technology Data Exchange (ETDEWEB)

    Hannemann, E.; Vortmeyer, N.; Zimmermann, G. [Siemens AG, Erlangen (Germany). Power Generation

    2004-07-01

    Siemens Power Generation has entered into several R & D projects within the European Commissions' 5th and 6th Framework Programs. One objective of those projects is to develop advanced modular IGCC concepts for in-refinery energy and hydrogen supply. Additional projects are dealing with pre- and post-combustion decarbonisation technologies, which should achieve high carbon dioxide capture at low costs. In parallel, the development of advanced combustion systems including enhanced fuel flexibility and application of low BTU gases in the highly efficient Siemens V94.3A gas turbine are in progress. In further step the technology for burning hydrogen enriched gases resulting from decarbonisation in CO{sub 2} free power plants will be provided. This report documents the current status of these activities. 9 refs., 12 figs.

  1. Comparison of Shell, Texaco, BGL and KRW gasifiers as part of IGCC plant computer simulations

    Energy Technology Data Exchange (ETDEWEB)

    Zheng, L.; Furimsky, E. [Natural Resources Canada, Ottawa, ON (Canada). CANMET Energy Technology Centre

    2005-07-01

    The performances of four IGCC plants employing Shell, Texaco, BGL and KRW gasifiers were simulated using ASPEN Plus software for three different feeds. Performance analyses and comparisons of all four IGCC plants were performed based on the established data bank from the simulation. Discussions were focused on gas compositions, gasifier selection and overall performance.

  2. 75 FR 22674 - Moynihan Station Development Project

    Science.gov (United States)

    2010-04-29

    ... DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Moynihan Station Development Project... availability of and public comment period for the Moynihan Station Development Project Environmental Assessment... 22675

  3. Proceedings of the coal-fired power systems 94: Advances in IGCC and PFBC review meeting. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, H.M.; Staubly, R.K.; Venkataraman, V.K. [eds.

    1994-06-01

    The Coal-Fired Power Systems 94 -- Advances in IGCC and PFBC Review Meeting was held June 21--23, 1994, at the Morgantown Energy Center (METC) in Morgantown, West Virginia. This Meeting was sponsored and hosted by METC, the Office of Fossil Energy, and the US Department of Energy (DOE). METC annually sponsors this conference for energy executives, engineers, scientists, and other interested parties to review the results of research and development projects; to discuss the status of advanced coal-fired power systems and future plans with the industrial contractors; and to discuss cooperative industrial-government research opportunities with METC`s in-house engineers and scientists. Presentations included industrial contractor and METC in-house technology developments related to the production of power via coal-fired Integrated Gasification Combined Cycle (IGCC) and Pressurized Fluidized Bed Combustion (PFBC) systems, the summary status of clean coal technologies, and developments and advancements in advanced technology subsystems, such as hot gas cleanup. A keynote speaker and other representatives from the electric power industry also gave their assessment of advanced power systems. This meeting contained 11 formal sessions and one poster session, and included 52 presentations and 24 poster presentations. Volume I contains papers presented at the following sessions: opening commentaries; changes in the market and technology drivers; advanced IGCC systems; advanced PFBC systems; advanced filter systems; desulfurization system; turbine systems; and poster session. Selected papers have been processed separately for inclusion in the Energy Science and Technology Database.

  4. Techno-economic analysis of lignite fuelled IGCC with CO{sub 2} capture. Comparing fluidized bed and entrained flow gasifiers

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Guangjian; Wu, Zhen; Zhang, Haiying [North China Electric Power Univ., Beijing (China). School of Energy and Power Engineering

    2013-07-01

    Integrated coal gasification combined cycle (IGCC) plants with pre-combustion capture of CO{sub 2} represent one of the most promising options for generating low-cost decarbonized power using bituminous coals. This work systematically quantify the effect of coal rank on the efficiency and economics of IGCC systems with CO2 capture and storage (CCS), with a special focus on comparison of systems using fluidized-bed gasifier (U-GAS) and entrained flow gasifier (Shell). It was found that the Shell IGCCs are little affect by low rank coal after pre-drying in terms of thermal efficiency and the levelized cost of electricity (LCOE) is only increase by 2-6% for lignite cases with and without CCS compared with bituminous coal cases. The specific CO{sub 2} emissions of U-GAS gasifier based lignite fuelled IGCC with CCS is 198 g/kWhe, almost two times of shell gasifier cases, mainly due to lower carbon conversion in the gasifier and the higher methane in the raw gas of gasifier. However, the total capital cost and COE of U-Gas IGCCs are 15-20% less than that of Shell IGCCs because of lower capital cost of gasifier, coal drying units and air separate units per kWe.

  5. Thermal and sintering characterization of IGCC slag

    Energy Technology Data Exchange (ETDEWEB)

    Acosta, A.; Iglesias, I.; Aineto, M.; Romero, M.; Rincon, J.M. [University of Castilla La Mancha, Ciudad Real (Spain)

    2002-07-01

    IGCC slag is a vitreous residual product from the new induction gasification combined cycle gasification thermal power plants. In order to characterize this waste as secondary raw material for the production of glasses and glass-ceramics as construction materials, slag from the Puertollano, Ciudad Real, Spain power plants was thermally investigated. After controlled heating this waste gives rise to hematite, anorthite, and cristobalite crystallized materials.

  6. Technical comparison between Integrated Gasification Combined Cycle (IGCC) and Natural Gas Combined Cycle (NGCC) power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ortiz, Pablo Andres Silva; Venturini, Osvaldo Jose; Lora, Electo Eduardo Silva [Federal University of Itajuba - UNIFEI, MG (Brazil). Excellence Group in Thermal Power and Distributed Generation - NEST], e-mails: osvaldo@unifei.edu.br, electo@unifei.edu.br

    2010-07-01

    Among the emerging clean coal technologies for power generation, Integrated Gasification Combined Cycle (IGCC) and Natural Gas Combined Cycle (NGCC) systems are receiving considerable attention as a potentially attractive option to reduce the emissions of greenhouse gases (GHG). The main reason is because these systems has high efficiency and low emissions in comparison with traditional power generation plants. Currently in IGCC and NGCC systems at demonstration stage is been considered to implement CCS technology. CO{sub 2} emissions can be avoided in a gasification-based power plant because by transferring almost all carbon compounds to CO{sub 2} through the water gas shift (WGS) reaction, then removing the CO{sub 2} before it is diluted in the combustion stage. The aim of this study is to compare the technical performance of an IGCC system that uses Brazilian coal and petroleum coke as fuel with a NGCC system, with the same fixed output power of 450 MW. The first section of this paper presents the plant configurations of IGCC systems. The following section presents an analysis of NGCC technology. (author)

  7. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  8. IGCC power plant integrated to a Finnish pulp and paper mill. IEA Bioenergy. Techno-economic analysis activity

    Energy Technology Data Exchange (ETDEWEB)

    Koljonen, T.; Solantausta, Y. [VTT Energy, Espoo (Finland). New Energy Technologies; Salo, K.; Horvath, A. [Carbona Inc. (Finland)

    1999-11-01

    In Finland, the pulp and paper industry is the largest consumer of energy among the industries and its power demand will increase due to economical and strict environ- mental requirements. The ageing of oil and biomass boilers in Finland also represents a window of opportunity for the introduction of new environmentally sound technology with a high efficiency in power production, e.g., in biomass gasification. This site-specific study describes the technical and economic feasibility of a biomass gasification combined cycle producing heat and power for a typical Finnish pulp and paper mill. The mill produces SC (super calantered) paper 500 000 ADt/a. The paper mill employs sulphate pulp and GW (ground wood) pulp. The capacity of the pulp mill is 400 000 ADt/a (air dry ton/year) of which 120 000 ADt/a is used at the site. The heat demand of the integrate is covered by a recovery boiler and a bark boiler. A condensing steam turbine with two extractions generates electricity for the mill. The aim is to replace an old bark boiler by an IGCC (Integrated Gasification Combined Cycle) to enhance the economy and environmental performance of the power plant. The IGCC feasibility study is conducted for an pulp and paper integrate because of its suitable infrastructure for IGCC and a large amount of wood waste available at the site. For comparison, the feasibility of an IGCC integrated to a pulp mill is also assessed. The IGCC concept described is based on research and development work performed by Carbona, Inc., who acquired the rights for know-how of Enviropower, Inc. The operation and design of the IGCC concept is based on a 20 MWe gas turbine (MW151). The heat of gas turbine exhaust gas is utilised in a HRSG (Heat Recovery Steam Generator) of two pressure levels to generate steam for the pulp and paper mill and the steam turbine. The MCC power plant operates in condensing mode. The total investment cost of the IGCC plant is estimated at FIM 417 million (USD 83.4 million

  9. IGCC power plant integrated to a Finnish pulp and paper mill. IEA Bioenergy. Techno-economic analysis activity

    International Nuclear Information System (INIS)

    Koljonen, T.; Solantausta, Y.

    1999-01-01

    In Finland, the pulp and paper industry is the largest consumer of energy among the industries and its power demand will increase due to economical and strict environ- mental requirements. The ageing of oil and biomass boilers in Finland also represents a window of opportunity for the introduction of new environmentally sound technology with a high efficiency in power production, e.g., in biomass gasification. This site-specific study describes the technical and economic feasibility of a biomass gasification combined cycle producing heat and power for a typical Finnish pulp and paper mill. The mill produces SC (super calantered) paper 500 000 ADt/a. The paper mill employs sulphate pulp and GW (ground wood) pulp. The capacity of the pulp mill is 400 000 ADt/a (air dry ton/year) of which 120 000 ADt/a is used at the site. The heat demand of the integrate is covered by a recovery boiler and a bark boiler. A condensing steam turbine with two extractions generates electricity for the mill. The aim is to replace an old bark boiler by an IGCC (Integrated Gasification Combined Cycle) to enhance the economy and environmental performance of the power plant. The IGCC feasibility study is conducted for an pulp and paper integrate because of its suitable infrastructure for IGCC and a large amount of wood waste available at the site. For comparison, the feasibility of an IGCC integrated to a pulp mill is also assessed. The IGCC concept described is based on research and development work performed by Carbona, Inc., who acquired the rights for know-how of Enviropower, Inc. The operation and design of the IGCC concept is based on a 20 MWe gas turbine (MW151). The heat of gas turbine exhaust gas is utilised in a HRSG (Heat Recovery Steam Generator) of two pressure levels to generate steam for the pulp and paper mill and the steam turbine. The MCC power plant operates in condensing mode. The total investment cost of the IGCC plant is estimated at FIM 417 million (USD 83.4 million

  10. CO{sub 2}-capture in coal based IGCC power plants

    Energy Technology Data Exchange (ETDEWEB)

    Van Aart, F.; Fleuren, W.; Kamphuis, H.; Ploumen, P.; Jelles, S. [KEMA, Arnhem (Netherlands)

    2007-07-01

    The paper discusses IGCC with carbon capture and storage (CCS), both for retrofit and capture ready plants. The penalties for carbon dioxide capture are given, along with its effect on CAPEX and OPEC costs. 3 refs., 9 figs.

  11. Recovery of flue gas energy in heat-integrated gasification combined cycle (IGCC) power plants using the contact economizer system

    CSIR Research Space (South Africa)

    Madzivhandila, VA

    2011-03-01

    Full Text Available (flue gas) stream of a heat-integrated gasification combined cycle (IGCC) design of the Elcogas plant adopted from previous studies. The underlying support for this idea was the direct relationship between efficiency of the IGCC and the boiler feedwater...

  12. Incorporating IGCC and CaO sorption-enhanced process for power generation with CO2 capture

    International Nuclear Information System (INIS)

    Chen, Shiyi; Xiang, Wenguo; Wang, Dong; Xue, Zhipeng

    2012-01-01

    Highlights: ► CaO sorption-enhanced process is incorporated with IGCC for CO 2 capture. ► IGCC–CCS is simplified using CaO sorption-enhanced process. ► The electricity efficiency is around 31–33% and CO 2 capture efficiency exceeds 95%. ► Parameters such as sorption pressure influence the system performance. -- Abstract: Integrated gasification combined cycle (IGCC) is a power generation technology to convert solid fuels into electricity. IGCC with CCS is regarded as a promising option to mitigate CO 2 emission. In this paper, the CaO sorption-enhanced process is incorporated downstream with coal gasification to produce a hydrogen-rich stream for electricity production and CO 2 separation. A WGS-absorber substitutes the high- and low-temperature water–gas shift reactors and desulfurization units in conventional IGCC–CCS to produce a hydrogen-rich stream, which is sent onto a gas turbine. CaO is used as the sorbent to enhance hydrogen production and for CO 2 capture. Regeneration of CaO is completed via calcination in a regenerator vessel. The IGCC with CaO sorption-enhanced process is modeled and simulated using Aspen Plus software. Two commercial available gasification technologies, Shell and Texaco, are integrated with the sorption-enhanced process. The results showed IGCC with CaO sorption-enhanced process has a satisfactory system performance. Even though the net electricity efficiency is not as high as expected, just around 30–33%, the system has a high CO 2 capture efficiency ∼97% and low pollutant emissions. Moreover, compared with conventional IGCC–CCS, the schematic diagram of the IGCC–CCS process is simplified. Parameters that affect the plant performance are analyzed in the sensitive analysis, including WGS-absorber temperature, H 2 O/CO ratio, pressure, etc. Some challenges to the system are also discussed.

  13. IGCC and PFBC By-Products: Generation, Characteristics, and Management Practices

    Energy Technology Data Exchange (ETDEWEB)

    Pflughoeft-Hassett, D.F.

    1997-09-01

    The following report is a compilation of data on by-products/wastes from clean coal technologies, specifically integrated gasification combined cycle (IGCC) and pressurized fluidized-bed combustion (PFBC). DOE had two objectives in providing this information to EPA: (1) to familiarize EPA with the DOE CCT program, CCT by-products, and the associated efforts by DOE contractors in the area of CCT by-product management and (2) to provide information that will facilitate EPA's effort by complementing similar reports from industry groups, including CIBO (Council of Industrial Boiler Owners) and EEI USWAG (Edison Electric Institute Utility Solid Waste Activities Group). The EERC cooperated and coordinated with DOE CCT contractors and industry groups to provide the most accurate and complete data on IGCC and PFBC by-products, although these technologies are only now being demonstrated on the commercial scale through the DOE CCT program.

  14. Siemens sees a future for IGCC - and now it has the technology

    Energy Technology Data Exchange (ETDEWEB)

    Schmid, C.; Hannemann, F. [Siemens Fuel Gasification Technology, Freiberg (Germany)

    2007-10-15

    About 18 months ago Siemens became a key player in the gasification business through its acquisition of Freiberg based Future Energy and its GSP entrained flow technology, now called SFG (Siemens Fuel Gasification). Developed at Schwarze Pumpe in Eastern Germany over many years, a particular attraction of the process is its ability to use low rank fuels such as lignite, with a robust gasifier wall concept a 'cooling screen' that avoids the use of troublesome refractories. The article explains the SFG gasifier technology. It is ideally suited for coal-fueled IGCC power plants with integrated CO{sub 2} capture, especially for low-rank fuels. SFG has been ordered or pre-selected for a number of projects in China, North America and elsewhere. 5 figs.

  15. THERMAL AND SINTERING CHARACTERIZATION OF A IGCC SLAG

    OpenAIRE

    Acosta, Anselmo; Iglesias, Isabel; Aineto, Mónica; Romero, Maximina; Rincón López, Jesús María

    2002-01-01

    IGCC slag is a vitreous residual product from the new induction gasification combined cycle gasification thermal power plants. In order to characterize this waste as secondary new material for the production of new glasses and glass-ceramics as construction materials; this slag from the Puertollano, Ciudad Real, Spain power plants has been fully thermally investigated. After controlled heating this waste gives rise to hematite, anorthite, and cristobalite crystallized materials.

  16. Recovery of flue gas energy in heat integrated IGCC power plants using the contact economizer system

    CSIR Research Space (South Africa)

    Madzivhandila, V

    2010-10-01

    Full Text Available Asia Pacific Confederation of APCChE 2010 Chemical Engineering Congress October 5-8, 2010, Taipei � �� Recovery of flue gas energy in heat integrated IGCC power plants using the contact economizer system Vhutshilo Madzivhandilaa, Thokozani... temperature and the thermal efficiency of the plant. The 13th Asia Pacific Confederation of APCChE 2010 Chemical Engineering Congress October 5-8, 2010, Taipei � �� 1. Introduction The IGCC (Integrated Gasification Combined Cycle) is one...

  17. CERAMIC MEMBRANE ENABLING TECHNOLOGY FOR IMPROVED IGCC EFFICIENCY

    International Nuclear Information System (INIS)

    Ravi Prasad

    2000-01-01

    The objective of this program is to conduct a technology development program to advance the state-of-the-art in ceramic Oxygen Transport Membranes (OTM) to the level required to produce step change improvements in process economics, efficiency, and environmental benefits for commercial IGCC systems and other applications. The IGCC program is focused on addressing key issues in materials, processing, manufacturing, engineering and system development that will make the OTM a commercial reality. The objective of the OTM materials development task is to identify a suitable material that can be formed into a thin film to produce the target oxygen flux. This requires that the material have an adequate permeation rate, and thermo-mechanical and thermo-chemical properties such that the material is able to be supported on the desired substrate and sufficient mechanical strength to survive the stresses involved in operation. The objective of the composite OTM development task is to develop the architecture and fabrication techniques necessary to construct stable, high performance, thin film OTMs supported on suitable porous, load bearing substrates. The objective of the process development task of this program to demonstrate the program objectives on a single OTM tube under test conditions simulating those of the optimum process cycle for the power plant

  18. Pre-Combustion Capture of CO2 in IGCC Plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-12-15

    Pre-combustion capture involves reacting a fuel with oxygen or air and/or steam to give mainly a 'synthesis gas (syngas)' or 'fuel gas' composed of carbon monoxide and hydrogen. The carbon monoxide is reacted with steam in a catalytic reactor, called a shift converter, to produce CO2 and more hydrogen. CO2 is then separated, usually by a physical or chemical absorption process, resulting in a hydrogen-rich fuel which can be used in many applications, such as boilers, furnaces, gas turbines, engines and fuel cells. Pre-combustion capture is suitable for use in integrated gasification combined cycle (IGCC) plants especially since the CO2 partial pressures in the fuel gas are higher than in the flue gas. After the introduction there follows a short discussion of the water-gas shift (WGS) reaction. This is followed by chapters on the means of CO2 capture by physical and chemical solvents, solid sorbents, and membranes. The results and conclusions of techno-economic studies are introduced followed by a look at some of the pilot and demonstration plants relevant to pre-combustion capture in IGCC plants.

  19. Live from Space Station Learning Technologies Project

    Science.gov (United States)

    2001-01-01

    This is the Final Report for the Live From Space Station (LFSS) project under the Learning Technologies Project FY 2001 of the MSFC Education Programs Department. AZ Technology, Inc. (AZTek) has developed and implemented science education software tools to support tasks under the LTP program. Initial audience consisted of 26 TreK in the Classroom schools and thousands of museum visitors to the International Space Station: The Earth Tour exhibit sponsored by Discovery Place museum.

  20. Milliken Station Demonstration Project FDG retrofit update

    Energy Technology Data Exchange (ETDEWEB)

    Alder, R.C.; Jackson, C.E.; O`Dea, D.T. [and others

    1994-12-31

    The Milliken Clean Coal Demonstration Project is one of the nine Clean Coal Projects selected for funding in Round 4 of the U.S. DOE`s Clean Coal Demonstration Program. The project`s sponsor is New York State Electric and Gas Corporation (NYSEG). Project team members include CONSOL Inc., Saarberg-Holter-Umwelttechnik (SHU), NALCO/FuelTech, Stebbins Engineering and Manufacturing Co., DHR Technologies, and CE Air Preheater. Gilbert/Commonwealth is the Architect/Engineer and Construction Manager for the flue gas desulfurization (FGD) retrofit. The project will provide full-scale demonstration of a combination of innovative emission-reducing technologies and plant upgraded for the control of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from a coal-fired steam generator without a significant loss of station efficiency. The overall project goals are the following: 98% SO{sub 2} removal efficiency using limestone while burning high sulfur coal; up to 70% NO{sub x} reduction using the NOXOUT selective non-catalytic reduction (SNCR) technology in conjunction with combustion modifications; minimization of solid waste by producing marketable by-products including commercial grade gypsum, calcium chloride, and fly ash; zero wastewater discharge; maintenance of station efficiency by using a high efficiency heat-pipe air heater system and a low-power-consuming scrubber system. The demonstration project is being conducted at NYSEG`s Milliken Station, located in Lansing, New York. Milliken Station has two 150-MWe pulverized coal-fired units built in the 1950s by Combustion Engineering. The SHU FGD process and the combustion modifications are being installed on both units, but the NOXOUT process, Plant Economic Optimization Advisor (PEOA), and the high-efficiency air heater system will be installed on only one unit.

  1. Computer models and simulations of IGCC power plants with Canadian coals

    Energy Technology Data Exchange (ETDEWEB)

    Zheng, L.; Furimsky, E.

    1999-07-01

    In this paper, three steady state computer models for simulation of IGCC power plants with Shell, Texaco and BGL (British Gas Lurgi) gasifiers will be presented. All models were based on a study by Bechtel for Nova Scotia Power Corporation. They were built by using Advanced System for Process Engineering (ASPEN) steady state simulation software together with Fortran programs developed in house. Each model was integrated from several sections which can be simulated independently, such as coal preparation, gasification, gas cooling, acid gas removing, sulfur recovery, gas turbine, heat recovery steam generation, and steam cycle. A general description of each process, model's overall structure, capability, testing results, and background reference will be given. The performance of some Canadian coals on these models will be discussed as well. The authors also built a computer model of IGCC power plant with Kellogg-Rust-Westinghouse gasifier, however, due to limitation of paper length, it is not presented here.

  2. Thermal expansion of slag and fly ash from coal gasification in IGCC power plant

    Energy Technology Data Exchange (ETDEWEB)

    M. Aineto; A. Acosta; J.M.A. Rincon; M. Romero [University of Castilla La Mancha, Ciudad Real (Spain). Laboratory of Applied Mineralogy

    2006-11-15

    Integrated gasification in combined cycle (IGCC) is an electrical power generation system which is characterized to be a clean coal technology different than conventional process in combustible treatment. IGCC process gives rise to inorganic solid wastes in the form of vitreous slag and fly ashes with singular thermal properties. The gasification of the fuel takes place at high temperature and pressure in reducing atmosphere. Under that conditions, gases such as H{sub 2}, N{sub 2} or CO, which are the main components of the gas mixture in the gasifier, show a high solubility in the melt and during the cooling remain enclosed in the vitreous slag. When these wastes are afterward thermal treated in oxidizing conditions, two phenomena occur. The development of a crystalline phase by devitrification of the glassy matrix and the releasing of the enclosed gas, which starts at temperatures nearly to the softening point. At higher temperatures the bubbles with increasing kinetic energy tend to ascend with difficulty through the viscous liquid phase and promotes an expansive reaction, giving rise to a foam glass-ceramic product. This paper has been focused on the study of thermal expansion in slag and fly ash samples from the ELCOGAS IGCC power plant located in Puertollano (Spain). 18 refs., 11 figs., 1 tab.

  3. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    Pasquini, L.A.

    1986-01-01

    The purpose of the Shippingport Station Decommissioning Project (SSDP) is to place the Shippingport Atomic Power Station in a long-term radiologically safe condition following defueling of the reactor, to perform decommissioning in such a manner as to demonstrate to the nuclear industry the application of decommissioning procedures to a large scale nuclear power plant, and to provide useful planning data for future decommissioning projects. This paper describes the Technology Transfer Program for collecting and archiving the decommissioning data base and its availability to the nuclear industry

  4. Shell coal IGCCS with carbon capture: Conventional gas quench vs. innovative configurations

    International Nuclear Information System (INIS)

    Martelli, Emanuele; Kreutz, Thomas; Carbo, Michiel; Consonni, Stefano; Jansen, Daniel

    2011-01-01

    Highlights: → We aim at defining the preferred IGCC design for dry feed gasifiers with CO 2 capture. → Multiple options of syngas cooling, humidification, and WGS are considered. → Plants are designed, modeled, numerically optimized and costs are carefully assessed. → Partial water quench has poor efficiency but low capital cost, then good performance. → Gas quench with the ECN staged WGS design has the best thermo-economic performance. -- Abstract: The Shell coal integrated gasification combined cycle (IGCC) based on the gas quench system is one of the most fuel flexible and energy efficient gasification processes because is dry feed and employs high temperature syngas coolers capable of rising high pressure steam. Indeed the efficiency of a Shell IGCC with the best available technologies is calculated to be 47-48%. However the system looses many percentage points of efficiency (up to 10) when introducing carbon capture. To overcome this penalty, two approaches have been proposed. In the first, the expensive syngas coolers are replaced by a 'partial water quench' where the raw syngas stream is cooled and humidified via direct injection of hot water. This design is less costly, but also less efficient. The second approach retains syngas coolers but instead employs novel water-gas shift (WGS) configurations that requires substantially less steam to obtain the same degree of CO conversion to CO 2 , and thus increases the overall plant efficiency. We simulate and optimize these novel configurations, provide a detailed thermodynamic and economic analysis and investigate how these innovations alter the plant's efficiency, cost and complexity.

  5. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the decontamination of plant components and structures at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities in support of the shipment of radioactive wastes and the unconditional release of the site and structural materials. 1 ref., 16 figs., 4 tabs

  6. A single IGCC design for variable CO{sub 2} capture

    Energy Technology Data Exchange (ETDEWEB)

    O' Keefe, L.F.; Griffiths, J.; Wainwright, J.M. [Chevron Texaco Worldwide Power and Gasification, Houston, TX (United States)

    2002-07-01

    Global warming and the production of greenhouse gases (GHG) have become an important issue in many countries around the world. While there has been a heightened sense of awareness that the combustion of fossil fuels produces the majority of the controllable carbon dioxide released to the atmosphere, there have been few substantive solutions that produce economically realistic solutions. Moreover, some fossil fuels, like coal, are viewed negatively due to their relatively high carbon content per Btu. Integrated Gasification Combined Cycle (IGCC) offers the option of a realistic, economically viable solution for reducing, by pre-combustion capture, significant amounts of CO{sub 2} while using existing commercially proven technologies. The novel IGCC flowscheme is designed so that the power plant can be built and operated without CO{sub 2} removal and later upgraded to low CO{sub 2} emissions at minimal additional cost. The novel flowscheme is based on commercially proven technology using processes that are in operation today. Overall performance and capital cost estimates are presented and two other possible applications of the novel flowscheme are discussed in this paper. 17 refs., 3 figs., 2 tabs.

  7. Shippingport Station Decommissioning Project Start of Physical Decommissioning

    International Nuclear Information System (INIS)

    Crimi, F. P.

    1987-01-01

    The Shippingport Atomic Power Station consists of the nuclear steam supply system and associated radioactive waste processing systems, which are owned by the United States Department of Energy, and the turbine-generator and balance of plant, which is owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania on seven acres of land leased by DOE from Duquesne Light Company. The Shippingport Station Decommissioning Project is being performed under contract to the DOE by the General Electric Company and its integrated subcontractor, Morrison-Knudsen Company. as the Decommissioning Operations Contractor. This paper describes the current status of the physical decommissioning work, which started September 1985. The preparations required to start a major decommissioning work effort in a safe and cost effective manner are discussed including the development and implementation of a cost/schedule control system. The detailed plan required to ensure that people, property, and procedures are ready in sufficient time to support the start of physical decommissioning is also discussed. The total estimated cost of the Shippingport Station Decommissioning Project should be $98.3 M, with the Project scheduled for completion in April 1990. As the decommissioning of the first commercial-scale nuclear power plant, the Shippingport Project is expected to set the standard for safe, cost-effective demolition of nuclear plants

  8. Development of advanced air-blown entrained-flow two-stage bituminous coal IGCC gasifier

    Directory of Open Access Journals (Sweden)

    Abaimov Nikolay A.

    2017-01-01

    Full Text Available Integrated gasification combined cycle (IGCC technology has two main advantages: high efficiency, and low levels of harmful emissions. Key element of IGCC is gasifier, which converts solid fuel into a combustible synthesis gas. One of the most promising gasifiers is air-blown entrained-flow two-stage bituminous coal gasifier developed by Mitsubishi Heavy Industries (MHI. The most obvious way to develop advanced gasifier is improvement of commercial-scale 1700 t/d MHI gasifier using the computational fluid dynamics (CFD method. Modernization of commercial-scale 1700 t/d MHI gasifier is made by changing the regime parameters in order to improve its cold gas efficiency (CGE and environmental performance, namely H2/CO ratio. The first change is supply of high temperature (900°C steam in gasifier second stage. And the second change is additional heating of blast air to 900°C.

  9. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  10. Waste management for the Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    Mullee, G.R.; Schulmeister, A.R.

    1987-01-01

    The Shippingport Station Decommissioning Project (SSDP) is being performed by the US Department of Energy (DOE) with the objectives of placing the station in a radiologically safe condition, demonstrating safe and cost effective dismantlement and providing useful data for future decommissioning projects. This paper describes the development of the Waste Management Plan which is being used for the accomplishment of the SSDP. Significant aspects of the Plan are described, such as the use of a process control and inventory system. The current status of waste management activities is reported. It is concluded that SSDP has some unique aspects which will provide useful information for future decommissioning projects

  11. Hydrogen fueling stations in Japan hydrogen and fuel cell demonstration project

    International Nuclear Information System (INIS)

    Koseki, K.; Tomuro, J.; Sato, H.; Maruyama, S.

    2004-01-01

    A new national demonstration project of fuel cell vehicles, which is called Japan Hydrogen and Fuel Cell Demonstration Project (JHFC Project), has started in FY2002 on a four-year plan. In this new project, ten hydrogen fueling stations have been constructed in Tokyo and Kanagawa area in FY2002-2003. The ten stations adopt the following different types of fuel and fueling methods: LPG reforming, methanol reforming, naphtha reforming, desulfurized-gasoline reforming, kerosene reforming, natural gas reforming, water electrolysis, liquid hydrogen, by-product hydrogen, and commercially available cylinder hydrogen. Approximately fifty fuel cell passenger cars and a fuel cell bus are running on public roads using these stations. In addition, two hydrogen stations will be constructed in FY2004 in Aichi prefecture where The 2005 World Exposition (EXPO 2005) will be held. The stations will service eight fuel cell buses used as pick-up buses for visitors. We, Engineering Advancement Association of Japan (ENAA), are commissioned to construct and operate a total of twelve stations by Ministry of Economy Trade and Industry (METI). We are executing to demonstrate or identify the energy-saving effect, reduction of the environmental footprint, and issues for facilitating the acceptance of hydrogen stations on the basis of the data obtained from the operation of the stations. (author)

  12. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1988-01-01

    US Department of Energy (DOE) Shippingport Station Decommissioning Project (SSDP) decommissioned, decontaminated, and dismantled the world's first, nuclear fueled, commercial size, electric power plant. SSDP programmatic goal direction for technology transfer is documentation of project management and operations experience. Objective is to provide future nuclear facility decommissioning projects with pertinent SSDP performance data for project assessment, planning, and operational implementation. This paper presents a working definition for technology transfer. Direction is provided for access and availability for SSDP technology acquisition

  13. FutureGen Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: • Site evaluation and selection process and environmental characterization • Underground Injection Control (UIC) Permit Application including well design and subsurface modeling • FutureGen IGCC-CCS Design Basis Document • Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report • Process flow diagrams and heat/material balance for slurry-fed gasifier configuration • Process flow diagrams and heat/material balance

  14. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The US Department of Energy (DOE) Shippingport Station Decommissioning Project (SSDP) decontaminated and dismantled the world's first nuclear-fueled, commercial-size electric power plant. The SSDP programmatic goal direction for technology transfer is documentation of project management and operations experience. The objective is to provide future nuclear facility decommissioning projects with pertinent SSDP performance data for project assessment, planning, and operational implementation. This paper sets out access and availability directions for SSDP technology acquisition. Discusses are technology transfer definition; technology transfer products including topical and other project reports, professional-technical society presentations, other project liaison and media relations, visual documentation, and technology transfer data base; and retrieving SSDP information

  15. More Energy-Efficient CO2 Capture from IGCC GE Flue Gases

    Directory of Open Access Journals (Sweden)

    Rakpong Peampermpool

    2017-03-01

    Full Text Available Carbon dioxide (CO2 emissions are one of the main reasons for the increase in greenhouse gasses in the earth’s atmosphere and carbon capture and sequestration (CCS is known as an effective method to reduce CO2 emissions on a larger scale, such as for fossil energy utilization systems. In this paper, the feasibility of capturing CO2 using cryogenic liquefaction and improving the capture rate by expansion will be discussed. The main aim was to design an energy-saving scheme for an IGCC (integrated gasification combined cycle power plant with CO2 cryogenic liquefaction capture. The experimental results provided by the authors, using the feed gas specification of a 740 MW IGCC General Electric (GE combustion power plant, demonstrated that using an orifice for further expanding the vent gas after cryogenic capture from 57 bar to 24 bar gave an experimentally observed capture rate up to 65%. The energy-saving scheme can improve the overall CO2 capture rate, and hence save energy. The capture process has also been simulated using Aspen HYSYS simulation software to evaluate its energy penalty. The results show that a 92% overall capture rate can be achieved by using an orifice.

  16. Fiscal 1998 research report. Feasibility study on the CO{sub 2} reduction project by residue power generation at the oil refinery in China; 1998 nendo chosa hokokusho. Chugoku no seiyusho ni okeru zansa hatsuden ni yoru CO{sub 2} sakugen project ni kansuru F/S chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the basic research on joint project promotion, this feasibility study supposed introduction of IGCC (integrated gasification combined cycle) to Nanjing oil refinery of Jinling Petrochemical Corp. (JPC) in China, estimated the CO{sub 2} emission reduction effect by in-refinery efficient power generation using petroleum coke residue as fuel, and assessed the feasibility of the project together with a cost benefit. The feasibility study result showed the effectiveness of IGCC introduction to the oil refinery for reducing CO{sub 2} emissions, occupying the interest of JPC. However, Nanjing oil refinery already making a decision to adopt another system (BTG) answered that early adoption of this project is difficult. The feasibility study result also showed that efficient operation of IGCC is difficult because of lower generation efficiency of petroleum coke residue, and achievement of the supposed CO{sub 2} emission reduction effect and profitability is difficult. The project based on this feasibility study result is probably difficult to be realized. (NEDO)

  17. Shell coal IGCCS with carbon capture. Conventional gas quench vs. innovative configurations

    Energy Technology Data Exchange (ETDEWEB)

    Martellia, E.; Consonni, S. [Politecnico di Milano, Via Scalabrini 76, Piacenza (Italy); Kreutz, T. [Princeton University, Guyot Hall, Room 129, Princeton, NJ (United States); Carbo, M.; Jansen, D. [Energy research Centre of the Netherlands ECN, P.O. Box 1, 1755 ZG, Petten (Netherlands)

    2011-11-15

    The Shell coal integrated gasification combined cycle (IGCC) based on the gas quench system is one of the most fuel flexible and energy efficient gasification processes because is dry feed and employs high temperature syngas coolers capable of rising high pressure steam. Indeed the efficiency of a Shell IGCC with the best available technologies is calculated to be 47-48%. However the system looses many percentage points of efficiency (up to 10) when introducing carbon capture. To overcome this penalty, two approaches have been proposed. In the first, the expensive syngas coolers are replaced by a 'partial water quench' where the raw syngas stream is cooled and humidified via direct injection of hot water. This design is less costly, but also less efficient. The second approach retains syngas coolers but instead employs novel water-gas shift (WGS) configurations that requires substantially less steam to obtain the same degree of CO conversion to CO2, and thus increases the overall plant efficiency. We simulate and optimize these novel configurations, provide a detailed thermodynamic and economic analysis and investigate how these innovations alter the plant's efficiency, cost and complexity.

  18. Evaluation of Service Station Attendant-Auto Care Project.

    Science.gov (United States)

    Cress, Ronald J.

    The project described offers an approach to providing occupational skills to socially and educationally handicapped youth, specifically the skills necessary for a service station attendant in driveway salesmanship and auto care. The 10-page evaluation report presents project goals and objectives with evaluation data (represented graphically) and…

  19. Economic evaluation of pre-combustion CO2-capture in IGCC power plants by porous ceramic membranes

    International Nuclear Information System (INIS)

    Franz, Johannes; Maas, Pascal; Scherer, Viktor

    2014-01-01

    Highlights: • Process simulations of IGCC with pre-combustion capture via membranes were done. • Most promising technology is the water–gas-shift-membrane-reactor (WGSMR). • Energetic evaluations showed minimum efficiency loss of 5.8%-points for WGSMR. • Economic evaluations identified boundary limits of membrane technology. • Cost of electricity for optimum WGSMR-case is 57 €/MW h under made assumptions. - Abstract: Pre-combustion-carbon-capture is one of the three main routes for the mitigation of CO 2 -emissions by fossil fueled power plants. Based on the data of a detailed technical evaluation of CO 2 -capture by porous ceramic membranes (CM) and ceramic membrane reactors (WGSMR) in an Integrated-Gasification-Combined-Cycle (IGCC) power plant this paper focuses on the economic effects of CO 2 -abatement. First the results of the process simulations are presented briefly. The analysis is based on a comparison with a reference IGCC without CO 2 -capture (dry syngas cooling, bituminous coal, efficiency of 47.4%). In addition, as a second reference, an IGCC process with CO 2 removal based on standard Selexol-scrubbing is taken into account. The most promising technology for CO 2 -capture by membranes in IGCC applications is the combination of a water gas shift reactor and a H 2 -selective membrane into one water gas shift membrane reactor. For the WGSRM-case efficiency losses can be limited to about 6%-points (including losses for CO 2 compression) for a CO 2 separation degree of 90%. This is a severe reduction of the efficiency loss compared to Selexol (10.3% points) or IGCC–CM (8.6% points). The economic evaluation is based on a detailed analysis of investment and operational costs. Parameters like membrane costs and lifetime, costs of CO 2 -certificates and annual operating hours are taken into account. The purpose of these evaluations is to identify the minimum cost of electricity for the different capture cases for the variation of the boundary

  20. Project authorization process in the thermal power stations vs in the hydroelectric power stations: two weights, two measurements?

    International Nuclear Information System (INIS)

    Comtois, Y.

    2004-01-01

    Key topics include the long tendering process, a comparison of two projects: thermal station vs. hydroelectrical station, and the solutions towards reducing the delay in obtaining authorization. (author)

  1. The appliction of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Tang Zhengrong; Zhang Zhixiong

    2001-01-01

    Concept, history, characteristics of the project management is introduced. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers our study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  2. Using renewables and the co-production of hydrogen and electricity from CCS-equipped IGCC facilities, as a stepping stone towards the early development of a hydrogen economy

    International Nuclear Information System (INIS)

    Haeseldonckx, Dries; D'haeseleer, William

    2010-01-01

    In this paper, specific cases for the interaction between the future electricity-generation mix and a newly-developing hydrogen-production infrastructure is modelled with the model E-simulate. Namely, flexible integrated-gasification combined-cycle units (IGCC) are capable of producing both electricity and hydrogen in different ratios. When these units are part of the electricity-generation mix and when they are not operating at full load, they could be used to produce a certain amount of hydrogen, avoiding the costly installation of new IGCC units for hydrogen production. The same goes for the massive introduction of renewable energies (especially wind), possibly generating excess electricity from time to time, which could then perhaps be used to produce hydrogen electrolytically. However, although contra-intuitive, the interaction between both 'systems' turns out to be almost negligible. Firstly, it is shown that it is more beneficial to use IGCC facilities to produce hydrogen with, rather than (excess) wind-generated electricity due to the necessary electrolyser investment costs. But even flexible IGCC facilities do not seem to contribute substantially to the early development of a hydrogen economy. Namely, in most scenarios - which are combinations of a wide range of fuel prices and carbon taxes - one primary-energy carrier (natural gas or coal) seems to be dominant, pushing the other, and the corresponding technologies such as reformers or IGCCs, out of the market. (author)

  3. The application of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Zhang Zhixiong; Tang Zhengrong

    2000-01-01

    The author first presents a brief introduction of the concept, history, characteristics of project management. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers authors' study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  4. Conceptual model and evaluation of generated power and emissions in an IGCC plant

    International Nuclear Information System (INIS)

    Perez-Fortes, M.; Bojarski, A.D.; Velo, E.; Nougues, J.M.; Puigjaner, L.

    2009-01-01

    This work develops a design and operation support tool for an Integrated Gasification Combined Cycle (IGCC) power plant, which allows the efficiency and environmental issues of alternative process designs and feedstock to be assessed. The study is based on a conceptual model of an IGCC plant, validated with data from the ELCOGAS power plant in Spain. The layout of the model includes an Air Separation Unit (ASU), a Pressurized Entrained Flow (PRENFLO) gasifier, a series of purification gas units (venturi scrubber, sour water steam stripper, COS hydrolysis reactor, MDEA absorber columns and a sulphur recovery Claus plant), a Heat Recovery Steam Generator (HRSG) and a Combined Cycle (CC) system. It comprises steady state models. One of the purposes of this work is to analyze the feasibility of coal co-gasification using waste materials; specifically petcoke and olive pomace (orujillo) are considered here. The model has been developed in Aspen Hysys. It uses electrolyte models that have been implemented in Aspen Plus which are connected to Aspen Hysys by means of Artificial Neural Networks (ANNs) models. Results of the model's, gas composition and generated power, are in agreement with the industrial data.

  5. Conceptual model and evaluation of generated power and emissions in an IGCC plant

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Fortes, M.; Bojarski, A. D.; Velo, E.; Nougues, J. M. [Department of Chemical Engineering, Universitat Politecnica de Catalunya, ETSEIB, Avda. Diagonal, 647, E-08028 Barcelona (Spain); Puigjaner, L., E-mail: luis.puigjaner@upc.edu [Department of Chemical Engineering, Universitat Politecnica de Catalunya, ETSEIB, Avda. Diagonal, 647, E-08028 Barcelona (Spain)

    2009-10-15

    This work develops a design and operation support tool for an Integrated Gasification Combined Cycle (IGCC) power plant, which allows the efficiency and environmental issues of alternative process designs and feedstock to be assessed. The study is based on a conceptual model of an IGCC plant, validated with data from the ELCOGAS power plant in Spain. The layout of the model includes an Air Separation Unit (ASU), a Pressurized Entrained Flow (PRENFLO) gasifier, a series of purification gas units (venturi scrubber, sour water steam stripper, COS hydrolysis reactor, MDEA absorber columns and a sulphur recovery Claus plant), a Heat Recovery Steam Generator (HRSG) and a Combined Cycle (CC) system. It comprises steady state models. One of the purposes of this work is to analyze the feasibility of coal co-gasification using waste materials; specifically petcoke and olive pomace (orujillo) are considered here. The model has been developed in Aspen Hysys. It uses electrolyte models that have been implemented in Aspen Plus which are connected to Aspen Hysys by means of Artificial Neural Networks (ANNs) models. Results of the model's, gas composition and generated power, are in agreement with the industrial data.

  6. Conceptual model and evaluation of generated power and emissions in an IGCC plant

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Fortes, M; Bojarski, A D; Velo, E; Nougues, J M; Puigjaner, L [Department of Chemical Engineering, Universitat Politecnica de Catalunya, ETSEIB, Avda. Diagonal, 647, E-08028 Barcelona (Spain)

    2009-10-15

    This work develops a design and operation support tool for an Integrated Gasification Combined Cycle (IGCC) power plant, which allows the efficiency and environmental issues of alternative process designs and feedstock to be assessed. The study is based on a conceptual model of an IGCC plant, validated with data from the ELCOGAS power plant in Spain. The layout of the model includes an Air Separation Unit (ASU), a Pressurized Entrained Flow (PRENFLO) gasifier, a series of purification gas units (venturi scrubber, sour water steam stripper, COS hydrolysis reactor, MDEA absorber columns and a sulphur recovery Claus plant), a Heat Recovery Steam Generator (HRSG) and a Combined Cycle (CC) system. It comprises steady state models. One of the purposes of this work is to analyze the feasibility of coal co-gasification using waste materials; specifically petcoke and olive pomace (orujillo) are considered here. The model has been developed in Aspen Hysys. It uses electrolyte models that have been implemented in Aspen Plus which are connected to Aspen Hysys by means of Artificial Neural Networks (ANNs) models. Results of the model's, gas composition and generated power, are in agreement with the industrial data. (author)

  7. Conceptual model and evaluation of generated power and emissions in an IGCC plant

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Fortes, M.; Bojarski, A.D.; Velo, E.; Nougues, J.M.; Puigjaner, L. [Department of Chemical Engineering, Universitat Politecnica de Catalunya, ETSEIB, Avda. Diagonal, 647, E-08028 Barcelona (Spain)

    2009-10-15

    This work develops a design and operation support tool for an Integrated Gasification Combined Cycle (IGCC) power plant, which allows the efficiency and environmental issues of alternative process designs and feedstock to be assessed. The study is based on a conceptual model of an IGCC plant, validated with data from the ELCOGAS power plant in Spain. The layout of the model includes an Air Separation Unit (ASU), a Pressurized Entrained Flow (PRENFLO) gasifier, a series of purification gas units (venturi scrubber, sour water steam stripper, COS hydrolysis reactor, MDEA absorber columns and a sulphur recovery Claus plant), a Heat Recovery Steam Generator (HRSG) and a Combined Cycle (CC) system. It comprises steady state models. One of the purposes of this work is to analyze the feasibility of coal co-gasification using waste materials; specifically petcoke and olive pomace (orujillo) are considered here. The model has been developed in Aspen Hysys. It uses electrolyte models that have been implemented in Aspen Plus which are connected to Aspen Hysys by means of Artificial Neural Networks (ANNs) models. Results of the model's, gas composition and generated power, are in agreement with the industrial data. (author)

  8. H2FIRST Reference Station Design Task: Project Deliverable 2-2

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Terlip, Danny [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ainscough, Chris [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Elgowainy, Amgad [Argonne National Lab. (ANL), Argonne, IL (United States)

    2015-04-20

    This report presents near-term station cost results and discusses cost trends of different station types. It compares various vehicle rollout scenarios and projects realistic near-term station utilization values using the station infrastructure rollout in California as an example. It describes near-term market demands and matches those to cost-effective station concepts. Finally, the report contains detailed designs for five selected stations, which include piping and instrumentation diagrams, bills of materials, and several site-specific layout studies that incorporate the setbacks required by NFPA 2, the National Fire Protection Association Hydrogen Technologies Code. This work identified those setbacks as a significant factor affecting the ability to site a hydrogen station, particularly liquid stations at existing gasoline stations. For all station types, utilization has a large influence on the financial viability of the station.

  9. Exergetic comparison of two KRW-based IGCC power plants

    International Nuclear Information System (INIS)

    Tsatsaronis, G.; Tawfik, T.; Lin, L.; Gallaspy, D.T.

    1991-01-01

    In studies supported by the U.S. Department of Energy and the Electric Power Research Institute, several design configurations of Kellogg-Rust-Westinghouse (KRW)-based Integrated Gasification-Combined-Cycle (IGCC) power plants were developed. Two of these configurations are compared in this paper, from the exergetic viewpoint. The exergetic comparison identifies the causes of performance differences between the two cases: differences in the exergy destruction of the gasification system, the gas turbine system, and the gas cooling process, as well as differences in the exergy loss accompanying the solids to disposal stream. The potential for using oxygen-blown versus air-blown KRW gasifiers, and hot gas versus cold gas cleanup processes is evaluated

  10. Shippingport station decommissioning project ALARA Program

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F.P. [Lockheed Environmental Systems and Technology Co., Houston, TX (United States)

    1995-03-01

    Properly planned and implemented ALARA programs help to maintain nuclear worker radiation exposures {open_quotes}As Low As Reasonably Achievable.{close_quotes}. This paper describes the ALARA program developed and implemented for the decontamination and decommissioning (D&D) of the Shippingport Atomic Power Station. The elements required for a successful ALARA program are discussed along with examples of good ALARA practices. The Shippingport Atomic Power Station (SAPS) was the first commercial nuclear power plant to be built in the United States. It was located 35 miles northwest of Pittsburgh, PA on the south bank of the Ohio river. The reactor plant achieved initial criticality in December 1959. During its 25-year life, it produced 7.5 billion kilowatts of electricity. The SAPS was shut down in October 1982 and was the first large-scale U.S. nuclear power plant to be totally decommissioned and the site released for unrestricted use. The Decommission Project was estimated to take 1,007 man-rem of radiation exposure and $.98.3 million to complete. Physical decommissioning commenced in September 1985 and was completed in September 1989. The actual man-rem of exposure was 155. The project was completed 6 months ahead of schedule at a cost of $91.3 million.

  11. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  12. Novel findings about management of gastric cancer: A summary from 10th IGCC

    OpenAIRE

    Penon, Danila; Cito, Letizia; Giordano, Antonio

    2014-01-01

    The Tenth International Gastric Cancer Congress (IGCC) was held in Verona, Italy, from June 19 to 22, 2013. The meeting enclosed various aspects of stomach tumor management, including both tightly clinical approaches, and topics more related to basic research. Moreover, an overview on gastrointestinal stromal tumors was provided too, although here not discussed. Here we will discuss some topics related to molecular biology of gastric cancer (GC), inherent to prognostic, diagnostic and therape...

  13. Towards retrofitting integrated gasification combined cycle (IGCC) power plants with solid oxide fuel cells (SOFC) and CO

    NARCIS (Netherlands)

    Thallam Thattai, A.; Oldenbroek, V.D.W.M.; Schoenmakers, L; Woudstra, T.; Purushothaman Vellayani, A.

    2017-01-01

    This article presents a detailed thermodynamic case study based on the Willem-Alexander Centrale (WAC) power plant in the Netherlands towards retrofitting SOFCs in existing IGCC power plants with a focus on near future implementation. Two systems with high percentage (up to 70%) biomass

  14. Thermodynamic simulation of CO{sub 2} capture for an IGCC power plant using the calcium looping cycle

    Energy Technology Data Exchange (ETDEWEB)

    Li, Y. [National Engineering Laboratory for Coal-Burning Pollutant Emission Reduction, Shandong University, Jinan (China); Zhao, C.; Ren, Q. [School of Energy and Environment, Southeast University, Nanjing (China)

    2011-06-15

    A CO{sub 2} capture process for an integrated gasification combined cycle (IGCC) power plant using the calcium looping cycle was proposed. The CO{sub 2} capture process using natural and modified limestone was simulated and investigated with the software package Aspen Plus. It incorporated a fresh feed of sorbent to compensate for the decay in CO{sub 2} capture activity during long-term cycles. The sorbent flow ratios have significant effect on the CO{sub 2} capture efficiency and net efficiency of the CO{sub 2} capture system. The IGCC power plant, using the modified limestone, exhibits higher CO{sub 2} capture efficiency than that using the natural limestone at the same sorbent flow ratios. The system net efficiency using the natural and modified limestones achieves 41.7% and 43.1%, respectively, at the CO{sub 2} capture efficiency of 90% without the effect of sulfation. (Copyright copyright 2011 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  15. Shippingport Station Decommissioning Project (SSDP). A progress report

    International Nuclear Information System (INIS)

    Mullee, G.R.; Usher, J.M.

    1986-01-01

    The Shippingport Atomic Power Station was shutdown in October, 1982 by the Plant Operator, Duquesne Light Company, for decommissioning by the US Department of Energy. The planning for decommissioning was completed in September, 1983. In September, 1984 operational responsibility for the station was transferred to the DOE's Decommissioning Operations Contractor - the General Electric Company (assisted by an integrated subcontractor, MK Ferguson Company). Significant accomplishments to date include the completion of all prerequisites for decommissioning, the removal of asbestos from plant systems, loading of irradiated reactor components into the reactor vessel for shipment, the commencement of electrical deactivations and the commencement of piping/component removal. Decontamination and waste processing are progressing in support of the project schedule. The reactor vessel will be shipped as one piece on a barge for burial at Hanford, Washington. The final release of the site is scheduled for April, 1990. A technology transfer program is being utilized to disseminate information about the project

  16. Puertollano IGCC Power Plant; Central de Gasificacion Integrada en Ciclo Combinado de Puertollano

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    The Puertollano IGCC Power Plant, rated 335 MW and located in Puertollano, Ciudad Real, in the central area of Spain, is a project led by ELCOGAS, a company incorporated by the European utilities ENDESA, ELECTRICITE DE FRANCE, IBERDROLA HIDROCANTABRICO ELECTRICIDADE DE PURTUGAL, ENEL and NATIONAL POWER and the technology and equipment suppliers SIEMENS, KRUPP UHDE and BABCOCK WILCOX ESPANOLA. IGCC technology is based in a process of coal gasification to obtain a clean combustion synthetic gas, integrated with a combined cycle, agas and steam, electricity-generating unit. The energy efficiency which is aimed to achieve at the Plant is 46% in ISO conditions. The Gasification unit uses the process of pressurised entrained flow for coal gasification. The gas is produced by the reaction of coal with oxygen at high temperatures, of up to 1600 degree centigree. This process is capable of gasifying a wide variety of types and qualities of coal for the production of a synthetic fuel gas. In the case of Puertollano, the raw fuel is a 50% mixture by weight of local coal and petroleum coke. The oxygen needed in the process and the nitrogen used for covering the fuel is generated in the Air Separation. The Gas Cleaning and Sulphur Recovery Unit clean the gases from contaminants and solid particles before to send them to the Gas Turbine. The clean gas is burnt in gas turbine of the Combined Cycle Plant, producing electricity. The exhaust gases feed a heat recovery steam generator, which produces steam used to generate additional electricity in a conventional steam turbine. The gas turbine is capable of operating both with synthetic gas and with natural gas, allowing operation flexibility. The net output of the plant up to December 1999 was 3.061 GWh, from them 344 GWh were produced with synthetic gas. This project has an important technological value, being the first power plant which uses coal gasification to feed a combined cycle in Spain and being also the biggest power plant

  17. Gas expanders at M/R Stations in the natural gas distribution network. Pre-project, subreport; Gasexpandere paa distributionsnettets M/R-stationer. Forprojekt, delrapport

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Niels Bjarne

    2010-05-15

    Danish Gas Technology Centre has been carrying out a feasibility project to clarify the possibilities of installing gas expanders at M/R-stations (Measuring and Regulating) in the Distribution system of the natural gas grid. A large number of such expanders are installed around the world. The novelty of this project is to use a heat pump to perform the necessary heating of the gas before the expander, and to ''export'' to the electricity grid the remaining electricity from the generator connected to the expander. The present project includes the small M/R-stations at the gas Distribution grid where pressure is reduced from 40 or 20 bar to 4 bar. The preliminary project (year 1 of project) has investigated whether components for such smaller systems can be found, and it has investigated prices for different quantities. A technical feasibility study has been done. Also, preliminary calculations of payback times has been carried out. A large potential of CO{sub 2}-reduction is present with this technology based on saving of natural gas combustion and on new electricity production displacing existing production without any use of primary energy. The main results and conclusions are: 1) There are component suppliers for expander systems suitable to the size of distribution network M/R stations. 2) Pressure regulators provided at the stations are laid out with significant overcapacity, enabling a simplified installation of the expander systems. 3) If the system is being rolled out across the Danish distribution grid, the realistic saving potential is approx. 2.3 million Nm3 of gas per year and a production of almost 40 million kWh of electricity. 4) If the price is 0.60 DKK/kWh for electricity sold, the simple pay-back is 6-7 years on average, covering a variation from 3 to 16 years at the various stations. The smallest stations are omitted. The best stations covering more than half of the gas flow have a pay-back time between 3 and 6 years. 5) The

  18. Analysis of IGCC-based plants with carbon capture for an efficient and flexible electric power generation

    International Nuclear Information System (INIS)

    Sorgenfrei, Max

    2016-01-01

    In this work, systems based on the Integrated gasification combined cycle (IGCC) technology with carbon capture are analyzed regarding an efficient and flexible electric power generation. All analysis are related to a high-efficiency or low-cost IGCC base case with carbon capture which are both commercially available. In the high-efficiency base case, thermodynamic inefficiencies are determined based on a conventional exergy analysis. The gasifier followed by the combustion chamber of the gas turbine running on syngas are rated to the largest inefficiencies. Based on an advanced exergy analysis, the inefficiencies are split into an avoidable and unavoidable part as well as an endogenous and exogenous part. For example, it was found that about half of the inefficiencies within the gasifier are caused by other components of the overall system(exogenous part). Further investigations on the combination of both splitting types are presented. The gas turbine system is identified to be a major component and therefore a detailed model was developed using state-of-the-art technologies. Based on this model, 12 types of characteristic inefficiencies were determined and rated by their exergy destruction. Chemical-Looping Combustion (CLC) is one of the most promising technologies to enhance the available IGCC design. CLC uses composite metal particles acting as an oxygen carrier to transport oxygen from the air to the fuel gas through a redox-cycle. Thus, the inefficiencies associated with the combustion process decrease and the application of physical absorption for capturing CO 2 is replaced by an inherent CO 2 -capture. In this work, the most suitable oxygen carriers for CLC using syngas (nickel oxide and iron oxide) are analyzed at different temperatures. Moreover, different types of gasifier as well as CLC reactor designs are analyzed. Regenerating the oxygen carrier by steam and air, produces additional hydrogen from the reduction of steam which is further combusted

  19. The 8000 MW project

    Energy Technology Data Exchange (ETDEWEB)

    Ubis, T. [Repsol YPF (Spain); Bressan, L. [Foster Wheeler (Italy); O' Keefe, L. [Texaco Power and Gasification (Netherlands)

    2001-04-01

    The article describes the heavy oil integrated gasification combined cycle (IGCC) complex designed to process the high sulfur by-products from the nearby Petronor Refinery (in Spain) and produce hydrogen and electricity. The process units and their feedstocks are described. The design and operation of the gasification unit and what it achieves are also described. The raw syngas from the scrubbers in the gasification unit is processed so that it can be fed to the combined cycle. How raw gas syngas cooling is carried out is described in outline. In the sulfur recovery units, the MDEA-rich solution (from the absorption tower) is expanded in a hydraulic turbine to recover power to pump the lean MDEA stream to the absorption tower. The Power Island is described under the sub-headings of: (i) quench gasification technology; (ii) IGCC complex performance; (iii) environmental compact; (iv) the site; (v) project implementation program and (vi) investment cost.

  20. Fuel Retrieval Sub-Project (FRS) Stuck Fuel Station Performance Test Data Report

    International Nuclear Information System (INIS)

    THIELGES, J.R.

    2000-01-01

    This document provides the test data report for Stuck Fuel Station Performance Testing in support of the Fuel Retrieval Sub-Project. The stuck fuel station was designed to provide a means of cutting open a canister barrel to release fuel elements, etc

  1. The role of IGCC technology in power generation using low-rank coal

    Energy Technology Data Exchange (ETDEWEB)

    Juangjandee, Pipat

    2010-09-15

    Based on basic test results on the gasification rate of Mae Moh lignite coal. It was found that an IDGCC power plant is the most suitable for Mae Moh lignite. In conclusion, the future of an IDGCC power plant using low-rank coal in Mae Moh mine would hinge on the strictness of future air pollution control regulations including green-house gas emission and the constraint of Thailand's foreign currency reserves needed to import fuels, in addition to economic consideration. If and when it is necessary to overcome these obstacles, IGCC is one variable alternative power generation must consider.

  2. Novel findings about management of gastric cancer: a summary from 10th IGCC.

    Science.gov (United States)

    Penon, Danila; Cito, Letizia; Giordano, Antonio

    2014-07-21

    The Tenth International Gastric Cancer Congress (IGCC) was held in Verona, Italy, from June 19 to 22, 2013. The meeting enclosed various aspects of stomach tumor management, including both tightly clinical approaches, and topics more related to basic research. Moreover, an overview on gastrointestinal stromal tumors was provided too, although here not discussed. Here we will discuss some topics related to molecular biology of gastric cancer (GC), inherent to prognostic, diagnostic and therapeutic tools shown at the conference. Results about well known subjects, such as E-cadherin loss of expression/function, were presented. They revealed that other mutations of the gene were identified, showing a continuous research to improve diagnosis and prognosis of stomach tumor. Simultaneously, new possible molecular markers with an established role for other neoplasms, were discussed, such as mesothelin, stomatin-like protein 2 and Notch-1. Hence, a wide overview including both old and new diagnostic/prognostic tools was offered. Great attention was also dedicated to possible drugs to be used against GC. They included monoclonal antibodies, such as MS57-2.1, drugs used in other pathologies, such as maraviroc, and natural extracts from plants such as biflorin. We would like to contribute to summarize the most impressive studies presented at the IGCC, concerning novel findings about molecular biology of gastric cancer. Although further investigations will be necessary, it can be inferred that more and more tools were developed, so as to better face stomach neoplasms.

  3. A Renewably Powered Hydrogen Generation and Fueling Station Community Project

    Science.gov (United States)

    Lyons, Valerie J.; Sekura, Linda S.; Prokopius, Paul; Theirl, Susan

    2009-01-01

    The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

  4. Co-benefits of including CCS projects in the CDM in India's power sector

    International Nuclear Information System (INIS)

    Eto, R.; Murata, A.; Uchiyama, Y.; Okajima, K.

    2013-01-01

    This study examines the effects of the inclusion of the co-benefits on the potential installed capacity of carbon dioxide capture and storage (CCS) projects with a linear programming model by the clean development mechanism (CDM) in India's power sector. It is investigated how different marginal damage costs of air pollutants affect the potential installed capacity of CCS projects in the CDM with a scenario analysis. Three results are found from this analysis. First, large quantity of IGCC with CCS becomes realizable when the certified emission reduction (CER) prices are above US$56/tCO 2 in the integrated Northern, Eastern, Western, and North-Eastern regional grids (NEWNE) and above US $49/tCO 2 in the Southern grid. Second, including co-benefits contributes to decrease CO 2 emissions and air pollutants with introduction of IGCC with CCS in the CDM at lower CER prices. Third, the effects of the co-benefits are limited in the case of CCS because CCS reduces larger amount of CO 2 emissions than that of air pollutants. Total marginal damage costs of air pollutants of US$250/t and US$200/t lead to CER prices of US$1/tCO 2 reduction in the NEWNE grid and the Southern grid. - Highlights: • We estimate effects of co-benefits on installed capacity of CCS projects in the CDM. • We develop a linear programming (LP) model of two grids of India. • Including co-benefits contributes to introduce IGCC with CCS in the CDM at lower CER prices

  5. Environmental Performance of Hypothetical Canadian Pre-Combustion Carbon Dioxide Capture Processes Using Life-Cycle Techniques

    Directory of Open Access Journals (Sweden)

    Lakkana Piewkhaow

    2016-03-01

    Full Text Available The methodology of life-cycle assessment was applied in order to evaluate the environmental performance of a hypothetical Saskatchewan lignite-fueled Integrated Gasification Combined Cycle (IGCC electricity generation, with and without pre-combustion carbon dioxide (CO2 capture from a full life-cycle perspective. The emphasis here is placed on environmental performance associated with air contaminants of the comparison between IGCC systems (with and without CO2 capture and a competing lignite pulverized coal-fired electricity generating station in order to reveal which technology offers the most positive environmental effects. Moreover, ambient air pollutant modeling was also conducted by using American Meteorological Society/Environmental Protection Agency Regulatory Model (AERMOD air dispersion modeling to determine the ground-level concentration of pollutants emitted from four different electricity generating stations. This study assumes that all stations are located close to Estevan. The results showed a significant reduction in greenhouse gas (GHG emissions and acidification potential by applying both post-combustion and pre-combustion CO2 capture processes. The GHG emissions were found to have reduced by 27%–86%, and IGCC systems were found to compare favorably to pulverized coal systems. However, in other environmental impact categories, there are multiple environmental trade-offs depending on the capture technology used. In the case of post-combustion capture, it was observed that the environmental impact category of eutrophication potential, summer smog, and ozone depletion increased due to the application of the CO2 capture process and the surface mining coal operation. IGCC systems, on the other hand, showed the same tendency as the conventional coal-fired electricity generation systems, but to a lesser degree. This is because the IGCC system is a cleaner technology that produces lower pollutant emission levels than the electricity

  6. Shippingport Station Decommissioning Project: Contaminated concrete removal: Topical report

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the removal of contaminated concrete from the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the decontamination activities in support of site release in the decommissioning of a nuclear power reactor. 4 refs., 8 figs., 2 tabs

  7. Contaminated concrete scabbling at the Shippingport station decommissioning project

    International Nuclear Information System (INIS)

    Bauer, R.G.

    1989-01-01

    The Shippingport atomic power station was the first commercial nuclear power plant in the United States, joining the Duquesne Light Company (DLC) grid in December 1957. The Shippingport station was shut down in October 1982 and defueled in preparation for dismantling. On September 6, 1984, the Shippingport Station Decommissioning Project (SSDP) office of the US Department of Energy (DOE) assumed responsibility for the site. At turnover, there were several areas in the plant where radioactive contamination was entrained in concrete surfaces. The removal of contaminated concrete at SSDP was an important part of the decontamination to meet site release criteria, which is a major consideration in the decommissioning of nuclear power reactors. The highlights of this activity include: (1) development and application of remote scabbling tools, which effectively removed the contaminated concrete surfaces, and (2) use of scabblers minimized the removal of noncontaminated concrete by removing shallow layers of the surface and contributed to waste control, since the waste form enabled good packaging efficiency

  8. Dynamic simulation of a low-temperature rectification Column as part of an IGCC power plant

    Energy Technology Data Exchange (ETDEWEB)

    Hanke, R. [Leipzig University of Applied Sciences, Department of Mechanical and Energy Engineering, P.O. Box 300066, D-04251 Leipzig (Germany); Hannemann, F. [Siemens AG - Power Generation, PG CTET, P.O. Box 3220, D-91050 Erlangen (Germany); Sundmacher, K. [Max Planck Institute of Dynamics of Complex Technical Systems, Sandtorstrasse 1, D-39106 Magdeburg (Germany); Otto-von-Guericke University Magdeburg, Faculty of Process and Systems Engineering, P.O. Box 4120, D-39106 Magdeburg (Germany)

    2003-11-01

    IGCC plants offer the opportunity to utilize fossil energy sources, like coal or heavy refinery residues, to satisfy increasing energy demand while considering strict environmental constraints. Such a plant consists of a combined power cycle, a fuel gasifier with downstream fuel gas conditioning and an air separation unit (ASU), where the oxygen required for gasification is produced. The low-temperature rectification column as the core of the ASU strongly affects the transient behavior of the system. (Abstract Copyright [2003], Wiley Periodicals, Inc.)

  9. Shippingport station decommissioning project irradiated components transfer: Topical report

    International Nuclear Information System (INIS)

    1988-01-01

    This topical report is a synopsis of the transfer of irradiated components into the Shippingport Reactor Pressure Vessel (RPV) performed at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities for the decommissioning of a nuclear power reactor to be removed in one piece

  10. Multi-fuel multi-product operation of IGCC power plants with carbon capture and storage (CCS)

    International Nuclear Information System (INIS)

    Cormos, Ana-Maria; Dinca, Cristian; Cormos, Calin-Cristian

    2015-01-01

    This paper investigates multi-fuel multi-product operation of IGCC plants with carbon capture and storage (CCS). The investigated plant designs co-process coal with different sorts of biomass (e.g. sawdust) and solid wastes, through gasification, leading to different decarbonised energy vectors (power, hydrogen, heat, substitute natural gas etc.) simultaneous with carbon capture. Co-gasification of coal with different renewable energy sources coupled with carbon capture will pave the way towards zero emissions power plants. The energy conversions investigated in the paper were simulated using commercial process flow modelling package (ChemCAD) in order to produce mass and energy balances necessary for the proposed evaluation. As illustrative cases, hydrogen and power co-generation and Fischer–Tropsch fuel synthesis (both with carbon capture), were presented. The case studies investigated in the paper produce a flexible ratio between power and hydrogen (in the range of 400–600 MW net electricity and 0–200 MW th hydrogen considering the lower heating value) with at least 90% carbon capture rate. Special emphasis were given to fuel selection criteria for optimisation of gasification performances (fuel blending), to the selection criteria for gasification reactor in a multi-fuel multi-product operation scenario, modelling and simulation of whole process, to thermal and power integration of processes, flexibility analysis of the energy conversion processes, in-depth techno-economic and environmental assessment etc. - Highlights: • Assessment of IGCC-based energy vectors poly-generation systems with CCS. • Optimisation of gasification performances and CO 2 emissions by fuel blending. • Multi-fuel multi-product operation of gasification plants

  11. Integration optimisation of elevated pressure air separation unit with gas turbine in an IGCC power plant

    International Nuclear Information System (INIS)

    Han, Long; Deng, Guangyi; Li, Zheng; Wang, Qinhui; Ileleji, Klein E.

    2017-01-01

    Highlights: • IGCC thermodynamic model was setup carefully. • Simulations focus on integration between an elevated pressure ASU with gas turbine. • Different recommended solutions from those of low pressure ASUs are figured out. • Full N 2 injection and 80% air extraction was suggested as the optimum integration. - Abstract: The integration optimisation between an elevated pressure air separation unit (EP-ASU) and gas turbine is beneficial to promote net efficiency of an integrated gasification combined cycle (IGCC) power plant. This study sets up the thermodynamic model for a 400 MW plant specially coupled with an EP-ASU, aiming to examine system performances under different integrations and acquire the optimum solution. Influences of air extraction rate at conditions of without, partial and full N 2 injection, as well as the effects of N 2 injection rate when adopting separate ASU, partial and full integrated ASU were both analysed. Special attention has been paid to performance differences between utilising an EP-ASU and a low pressure unit. Results indicated that integration solution with a separate EP-ASU or without N 2 injection would not be reasonable. Among various recommended solutions for different integration conditions, N 2 injection rate increased with the growth of air extraction rate. The integration with an air extraction rate of 80% and full N 2 injection was suggested as the optimum solution. It is concluded that the optimum integration solution when adopting an EP-ASU is different from that using a low pressure one.

  12. Green power production by co-gasification of biomass in coal-fired oxygen-blown entrained-flow based IGCC processes

    Energy Technology Data Exchange (ETDEWEB)

    Van Ree, R; Korbee, R; De Smidt, R P; Jansen, D [ECN Fuels Conversion and Environment, Petten (Netherlands); Baumann, H R; Ullrich, N [Krupp Uhde, Dortmund (Germany); Haupt, G; Zimmerman, [Siemens, Erlangen (Germany)

    1998-11-01

    The use of coal for large scale power production meets a growing environmental concern. In spite of the fact that clean coal conversion technologies integrated with high-efficiency power production facilities, such as IGCC, are developed, the aim for sustainable development strives for a power production system based on renewable energy sources. One of the most promising renewable energy sources that can be used in the Netherlands is biomass, i.e. organic waste materials and/or energy crops. To accelerate the introduction of this material, in a technical and economically acceptable way, co-gasification with fossil fuels, in particular coal, in large scale IGCC processes is considered. In this paper the technical feasibility, economic profitability, and environmental acceptability of co-gasification of biomass in coal-fired oxygen-blown entrained-flow based IGM is discussed. Both a base-case coal-fired oxygen-blown entrained-flow based IGCC process - showing strong resemblance to the Puertollano IGCC plant in Spain - and three co-gasification concepts, viz.: (1) a concept with separate dry coal and biomass feeding systems, (2) a concept with a combined dry coal/biomass-derived pyrolysis char feeding system, and (3) a concept with parallel biomass pre-treatment/gasification and combined fuel gas clean-up/power production, were defined for further consideration. The base-case system and the co-gasification concepts as well are modelled in the flowsheet simulation package ASPEN{sup +}. Steady-state integral system calculations resulted in an overall net electrical plant efficiency for the base-case system of 50. 1 %LHV (48.3 %HHV). Replacing about 10 % of the total thermal plant input (coal) by biomass (willow) resulted in a decrease of the overall net electrical plant efficiency of 1.4 to 2.1 %-points LHV, avoided specific CO2 emissions of 40-49 g/kWh{sub e}, and total avoided CO2 emissions of about 129 to 159 kt/a, all depending on the co-gasification concept

  13. The future of integrated coal gasification combined cycle power plants

    International Nuclear Information System (INIS)

    Mueller, R.; Termuehlen, H.

    1991-01-01

    This paper examines the future of integrated coal gasification combined cycle (IGCC) power plants as affected by various technical, economical and environmental trends in power generation. The topics of the paper include a description of natural gas-fired combined cycle power plants, IGCC plants, coal gasifier concepts, integration of gasifiers into combined cycle power plants, efficiency, environmental impacts, co-products of IGCC power plants, economics of IGCC power plants, and a review of IGCC power plant projects

  14. The slag from ELCOGAS IGCC thermal power plant as raw material for the synthesis of glass-ceramic materials. Part I: Thermal behavior of the IGCC slag and synthesis of the parent glass.

    Energy Technology Data Exchange (ETDEWEB)

    Aineto, M.; Acosta, A. [University of Castilla La Mancha, Ciudad Real (Spain)

    2005-12-01

    We report here the results of the first phase of investigation on the melting behavior of the IGCC slag, and the use of this slag as raw component to produce glass ceramics. The vitrifying mixture named ECSCP, is composed of 40% slag, 30% glass cullet and 30% precipitated calcium carbonate obtained as a by-product in a sugar refining plant. This mixture was melted at 1450{sup o}C to obtain the ECSCP parent glass, that was then characterized and its crystallization kinetics studied by thermal analysis. The ECSCP glass exhibit a surface mechanism of crystallization, and will be used to produce anorthite/wollastonite glass ceramics in the second part of the investigation.

  15. Hot gas cleaning, a targeted project

    Energy Technology Data Exchange (ETDEWEB)

    Romey, I. [University of Essen, Essen (Germany)

    1998-11-01

    Advanced hot gas cleaning systems will play a key role in future integrated combined cycle technologies. IGCC demonstration plants in operation or under construction are at present equipped with conventional wet gas scrubbing and cleaning systems. Feasibility studies for those IGCC plants have shown that the total efficiency of the processes can be improved using hot gas cleaning systems. However, this technology has not been developed and tested at a technical scale. Six well-known European industrial companies and research centres jointly worked together since January 1996 on a Targeted Project `Hot Gas Cleaning` to investigate and develop new hot gas cleaning systems for advanced clean coal power generation processes. In addition project work on chemical analysis and modelling was carried out in universities in England and Germany. The latest main findings were presented at the workshop. The main project aims are summarised as follows: to increase efficiency of advanced power generation processes; to obtain a reduction of alkalis and environmental emissions e.g. SO{sub 2}, NO{sub x}, CO{sub 2} and dust; and to develop the design basis for future industrial plants based on long-term operation of laboratory, pilot and demo-plants. To cover a range of possible process routes for future hot gas cleaning systems the following research programme is under investigation: removal of trace elements by different commercial and self developed sorbents; gas separation by membranes; separation of gas turbine relevant pollutants by hot filter dust and; H{sub 2}S removal and gas dedusting at high temperatures. 13 figs.

  16. [Shippingport Station Decommissioning Project]: FY 1987 annual progress report, October 1, 1986-September 30, 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1987. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 3 refs., 9 figs., 4 tabs

  17. Shippingport Station Decommissioning Project: FY 1988 annual progress report, October 1, 1987--September 30, 1988

    International Nuclear Information System (INIS)

    1989-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1988. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedular considerations. 4 refs., 17 figs., 2 tabs

  18. Air toxics emission from an IGCC process

    Energy Technology Data Exchange (ETDEWEB)

    Mojtahedi, W; Hovath, A [Carbona Inc, Helsinki (Finland); Hinderson, A [Vattenfall Utveckling (Sweden); Nykaenen, J; Hoffren, H [Imatran Voima Oy, Vantaa (Finland); Nieminen, M; Kurkela, E [VTT, Espoo (Finland)

    1997-10-01

    The emissions of 12 toxic trace element from a coal-fired IGCC plant were calculated based on thermodynamic equilibrium in the gas phase and some of the results published. The theoretical calculations were extended to include some other fuels as well as mixture of some of these fuels. The combustion of the product gas in the gas turbine is also considered. These simulations correspond to gasification of the fuel at 850-1050 deg C (depending on the fuel) and 1823 bar pressure. The gas composition was taken from the measured data as far as possible. In the absence of experimental data, a computer code developed for the U-Gas gasifier was used to determine the fuel gas composition. The gas was then cooled to 550 deg C in the gas cooler and filtered at this same temperature and burned in the gas turbine with an air ratio of 3.2. The results of these simulations are compared with the measured data of an experimental program designed to measure the emissions of a few selected trace elements from a 15 MW,h pressurized fluidized bed gasification pilot plant. The pilot plant was equipped with an advanced hot gas cleanup train which includes a two fluidized-bed reactor system for high-temperature, high-pressure external sulfur removal and a filtration unit housing porous, rigid ceramic candle filters. The trace element concentrations in the fuel, bottom ash, and filter ash are determined and the results compared with EPA regulatory levels

  19. Aerodynamics and Heat Transfer Studies of Parameters Specific to the IGCC-Requirements: Endwall Contouring, Leading Edge and Blade Tip Ejection under Rotating Turbine Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Schobeiri, Meinhard; Han, Je-Chin

    2014-09-30

    This report deals with the specific aerodynamics and heat transfer problematic inherent to high pressure (HP) turbine sections of IGCC-gas turbines. Issues of primary relevance to a turbine stage operating in an IGCC-environment are: (1) decreasing the strength of the secondary flow vortices at the hub and tip regions to reduce (a), the secondary flow losses and (b), the potential for end wall deposition, erosion and corrosion due to secondary flow driven migration of gas flow particles to the hub and tip regions, (2) providing a robust film cooling technology at the hub and that sustains high cooling effectiveness less sensitive to deposition, (3) investigating the impact of blade tip geometry on film cooling effectiveness. The document includes numerical and experimental investigations of above issues. The experimental investigations were performed in the three-stage multi-purpose turbine research facility at the Turbomachinery Performance and Flow Research Laboratory (TPFL), Texas A&M University. For the numerical investigations a commercial Navier-Stokes solver was utilized.

  20. Effective utilization of fossil fuels for low carbon world -- IGCC and high performance gas turbine

    Energy Technology Data Exchange (ETDEWEB)

    Ishii, Hiromi; Hashimoto, Takao; Sakamoto, Koichi; Komori, Toyoaki; Kishine, Takashi; Shiozaki, Shigehiro

    2010-09-15

    The reduction of greenhouse-gas emissions is required to minimize the effect of hydrocarbon based power generation on global warming. In pursue of this objective, Mitsubishi Heavy Industries is dedicating considerable efforts on two different ways to reduce the environmental impact. The first one involves gas turbine performance improvement by raising firing temperature for Natural-gas and LNG applications. In this regard, the latest J class gas turbine was designed to operate at 1600 deg C and expected combined cycle efficiency in excess of 60%. The other approach involves the use of Integrated Gasification Combined Cycle (IGCC) plants to burn solid fuel like coal.

  1. Shippingport Station decommissioning project overview

    International Nuclear Information System (INIS)

    Schreiber, J.J.

    1985-01-01

    The U.S. Department of Energy is in the process of decommissioning the Shippingport Atomic Power Station located on the Ohio River, 30 miles northwest of Pittsburgh, Pennsylvania. The Shippingport Station is the first commercial size nuclear power plant to undergo decommissioning in the United Staes. The plant is located on approximately 7 acres of land owned by the Duquesne Light Company (DLC) and leased to the U.S. Government. DLC operates two nuclear power plants, Beaver Valley 1 and 2, located immediately adjacent to the site and the Bruce Mansfield coal-fired power plant is also within the immediate area. The Station was shutdown in October, 1982. Defueling operations began in 1983 and were completed by September, 1984. The Shippingport Station consists of a 275' x 60' fuel handling building containing the reactor containment chamber, the service building, the turbine building, the radioactive waste processing building, the administration building and other smaller support buildings. The Station has four coolant loops and most of the containment structures are located below grade. Structures owned by the U.S. Government including the fuel handling building, service building, contaminated equipment room, the boiler chambers, the radioactive waste processing building and the decontamination and laydown buildings will be dismantled and removed to 3 feet below grade. The area will then be filled with clean soil and graded. The turbine building, testing and training building and the administration building are owned by DLC and will remain

  2. Speciation of major and selected trace elements in IGCC fly ash

    Energy Technology Data Exchange (ETDEWEB)

    Oriol Font; Xavier Querol; Frank E. Huggins; Jose M. Chimenos; Ana I. Fernandez; Silvia Burgos; Francisco Garcia Pena [Institute of Earth Sciences ' Jaume Almera' , Barcelona (Spain)

    2005-08-01

    The speciation of Ga, Ge, Ni, V, S and Fe in fly ash from IGCC power plant were investigated for possible further extraction process by combining conventional mineral and chemical analysis, leaching tests, wet sequential extraction, Moessbauer and XAFS spectroscopies. The results shown that Ge occurs mainly as water-soluble species, GeS and/or GeS{sub 2} and hexagonal GeO{sub 2}. Ga is present as an oxide, Ni occurs mainly as nickeline (NiAs), with minor proportions of Ni arsenates and vanadium as V(III) with minor amounts of V(IV) in the aluminosilicate glass matrix. Pyrrhotite and wurtzite-sphalerite are sulfide species containing Fe and Zn, but an important fraction of iron is also present in the aluminosilicate glass. These clear differences between the speciation of the above elements in this material and those reported for fly ash from conventional PC combustion. 15 refs., 8 figs., 5 tabs.

  3. High temperature gasification and gas cleaning – phase II of the HotVegas project

    OpenAIRE

    Meysel, P.; Halama, S.; Botteghi, F.; Steibel, M.; Nakonz, M.; Rück, R.; Kurowski, P.; Buttler, A.; Spliethoff, H.

    2016-01-01

    The primary objective of the research project HotVeGas is to lay the necessary foundations for the long-term development of future, highly efficient high-temperature gasification processes. This includes integrated hot gas cleaning and optional CO2 capture and storage for next generation IGCC power plants and processes for the development of synthetic fuels. The joint research project is funded by the German Federal Ministry of Economics and Technology and five industry partners. It is coordi...

  4. Corrosion of ceramics for slag removal in IGCC-power plants; Korrosion von Keramiken fuer die Fluessigascheabscheidung in IGCC-Kraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Fuerst, Denny

    2012-06-12

    Coal gasification and the subsequent production of electricity from syngas in combined-cycle powerplants allows plant efficiencies of up to 43% (LHV). Existing technologies allow up to 50% in the short term. Efficiencies beyond 50% however, require concepts and technologies that still need a certain amount of research and development. One such method to raise plant efficiencies would be a high temperature (at temperatures above the melting point of the ash) syngas cleaning. To effectively utilize the heat from the syngas and enable high turbine inlet temperatures, it is necessary to remove slag particles from the hot gas. The feasibility of such a hot syngas cleaning has been successfully demonstrated for the Pressurized Pulverized Coal Combustion (PPCC) by passing the hot gas through a bed of ceramic balls for slag removal. In order to apply this concept to IGCC powerplants the slag resistance of various ceramic materials had to be investigated under gasifying conditions. Therefore, lab-made ceramics and commercially available refractory materials where treated with liquid slag at 1600 C in a number of reducing atmospheres. At first, three synthetic slags with different basicity were used and after evaluating the results, selected materials were treated with a gasifier slag under continuous conditions. It was shown that both slag and ceramic have to be adjusted to ensure a sufficient corrosion resistance of the ceramic bed for slag removal. Furthermore, the impact of the porosity of the utilized ceramic on the corrosion resistance was shown. The composition of the reducing atmosphere (mainly the partial pressure of Oxygen) affected both physical and chemical properties of the slag via slag components that could easily be reduced or oxidized. The materials most suitable for use in slag separation were found to be dense chromium oxide and other ceramics containing a high amount of chromium oxide. [German] Mit Kohlevergasung und der anschliessenden Stromerzeugung in

  5. Model Based Optimal Sensor Network Design for Condition Monitoring in an IGCC Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Rajeeva; Kumar, Aditya; Dai, Dan; Seenumani, Gayathri; Down, John; Lopez, Rodrigo

    2012-12-31

    This report summarizes the achievements and final results of this program. The objective of this program is to develop a general model-based sensor network design methodology and tools to address key issues in the design of an optimal sensor network configuration: the type, location and number of sensors used in a network, for online condition monitoring. In particular, the focus in this work is to develop software tools for optimal sensor placement (OSP) and use these tools to design optimal sensor network configuration for online condition monitoring of gasifier refractory wear and radiant syngas cooler (RSC) fouling. The methodology developed will be applicable to sensing system design for online condition monitoring for broad range of applications. The overall approach consists of (i) defining condition monitoring requirement in terms of OSP and mapping these requirements in mathematical terms for OSP algorithm, (ii) analyzing trade-off of alternate OSP algorithms, down selecting the most relevant ones and developing them for IGCC applications (iii) enhancing the gasifier and RSC models as required by OSP algorithms, (iv) applying the developed OSP algorithm to design the optimal sensor network required for the condition monitoring of an IGCC gasifier refractory and RSC fouling. Two key requirements for OSP for condition monitoring are desired precision for the monitoring variables (e.g. refractory wear) and reliability of the proposed sensor network in the presence of expected sensor failures. The OSP problem is naturally posed within a Kalman filtering approach as an integer programming problem where the key requirements of precision and reliability are imposed as constraints. The optimization is performed over the overall network cost. Based on extensive literature survey two formulations were identified as being relevant to OSP for condition monitoring; one based on LMI formulation and the other being standard INLP formulation. Various algorithms to solve

  6. Shippingport Station Decommissioning Project: FY 1986 annual progress report, October 1, 1985 through September 30, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1986. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 9 refs., 4 figs., 3 tabs

  7. Future technological and economic performance of IGCC and FT production facilities with and without CO2 capture: Combining component based learning curve and bottom-up analysis

    NARCIS (Netherlands)

    Knoope, M.M.J.; Meerman, J.C.; Ramirez, C.A.; Faaij, A.P.C.

    2013-01-01

    This study aims to investigate the technological and economic prospects of integrated gasification facilities for power (IGCC) and Fischer–Tropsch (FT) liquid production with and without CCS over time. For this purpose, a component based experience curve was constructed and applied to identify the

  8. Feasibility analysis of gas turbine inlet air cooling by means of liquid nitrogen evaporation for IGCC power augmentation

    International Nuclear Information System (INIS)

    Morini, Mirko; Pinelli, Michele; Spina, Pier Ruggero; Vaccari, Anna; Venturini, Mauro

    2015-01-01

    Integrated Gasification Combined Cycles (IGCC) are energy systems mainly composed of a gasifier and a combined cycle power plant. Since the gasification process usually requires oxygen as the oxidant, an Air Separation Unit (ASU) is also part of the plant. In this paper, a system for power augmentation in IGCC is evaluated. The system is based on gas turbine inlet air cooling by means of liquid nitrogen spray. In fact, nitrogen is a product of the ASU, but is not always exploited. In the proposed plant, the nitrogen is first liquefied to be used for inlet air cooling or stored for later use. This system is not characterized by the limits of water evaporative cooling systems (the lower temperature is limited by air saturation) and refrigeration cooling (the effectiveness is limited by the pressure drop in the heat exchanger). A thermodynamic model of the system is built by using a commercial code for energy conversion system simulation. A sensitivity analysis on the main parameters is presented. Finally the model is used to study the capabilities of the system by imposing the real temperature profiles of different sites for a whole year and by comparing to traditional inlet air cooling strategies. - Highlights: • Gas turbine inlet air cooling by means of liquid nitrogen spray. • Humidity condensation may form a fog which provides further power augmentation. • High peak and off peak electric energy price ratios make the system profitable

  9. Questionnaire regarding the international Freiberg conference on IGCC and XtL technologies. Analysis of 75 questionnaires

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The Puertollano IGCC Plant, owned by ELCOGAS, uses a mixture (50/50% weight) of local coal with high content of ash (approximately 45%) and pet-coke to be fed into its pressurised entrained flow gasifier. Ash is removed from the bottom of the gasifier as vitrified slag although a fraction is converted into fly ash (2.5-3 t/h) and entrained by the syngas. In order to remove this fly ash, it is filtered in two candle filter vessels with more than 1,000 candles each, using nitrogen for on-line cleaning. The filtering system suffers some malfunctions resulting in blinding of the internal candle surface and increasing of the candle DP. The model of candle filter was changed and modifications were performed without the desired results. Therefore, the identification of suitable hot gas filtration technologies capable of overcoming current and future severe operational constraints experienced is of the utmost importance for IGCC units. In this sense, a pilot plant which allows the performance of alternative filtering elements tests, pulse cleaning strategies, on-line particulate monitoring and off-cleaning procedures has come into operation at the ESI-University of Seville facilities. The design has been conceived as a versatile pilot unit, in order to hold both bags and ceramic candles which are to be tested in a wide range of operating conditions. The pilot is processing air laden with real fly ash provided by ELCOGAS, and high pressure nitrogen for the cleaning operation. This paper describes the design and operation of the pilot as well as the testing plan currently being carried out. (orig.)

  10. Shippingport Station Decommissioning Project: FYs 1984-1985 annual progress report, October 1, 1983 through September 30, 1985

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FYs 1984-85. There are three main topics: project management, decommissioning project activities, and issues of concern. The project purpose is demonstration of nuclear plant decommissioning and dismantlement operations in an environment of current industry practices. 8 refs., 8 figs., 2 tabs

  11. Comprehensive report to Congress Clean Coal Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-01

    This project will demonstrate Integrated Gasification Combined Cycle (IGCC) technology in a commercial application by the repowering of an existing City Water, Light and Power (CWL P) Plant in Springfield, Illinois. The project duration will be 126 months, including a 63-month demonstration period. The estimated cost of the project is $270,700,000 of which $129,357,204 will be funded by DOE. The IGCC system will consist of CE's air-blown, entrained-flow, two-stage, pressurized coal gasifier; an advanced hot gas cleanup process; a combustion turbine modified to use low Btu coal gas; and all necessary coal handling equipment. An existing 25-MWe steam turbine and associated equipment will also be part of the IGCC system. The result of repowering will be an IGCC power plant with low environmental emissions and high net plant efficiency. The repowering will increase plant output by 40 MWe through addition of the combustion turbine, thus providing a total IGCC capacity of a nominal 65 MWe. 3 figs., 2 tabs.

  12. NASA Systems Autonomy Demonstration Project - Development of Space Station automation technology

    Science.gov (United States)

    Bull, John S.; Brown, Richard; Friedland, Peter; Wong, Carla M.; Bates, William

    1987-01-01

    A 1984 Congressional expansion of the 1958 National Aeronautics and Space Act mandated that NASA conduct programs, as part of the Space Station program, which will yield the U.S. material benefits, particularly in the areas of advanced automation and robotics systems. Demonstration programs are scheduled for automated systems such as the thermal control, expert system coordination of Station subsystems, and automation of multiple subsystems. The programs focus the R&D efforts and provide a gateway for transfer of technology to industry. The NASA Office of Aeronautics and Space Technology is responsible for directing, funding and evaluating the Systems Autonomy Demonstration Project, which will include simulated interactions between novice personnel and astronauts and several automated, expert subsystems to explore the effectiveness of the man-machine interface being developed. Features and progress on the TEXSYS prototype thermal control system expert system are outlined.

  13. The Impact of Climatological Conditions on Low Enriched Uranium Loading Station Operations for the HEU Blend Down Project

    International Nuclear Information System (INIS)

    Chang, R.C.

    2002-01-01

    A computer model was developed using COREsim to perform a time motion study for the Low Enriched Uranium (LEU) Loading Station operations. The project is to blend Highly Enriched Uranium (HEU) with Natural Uranium (NU) to produce LEU to be shipped to Tennessee Valley Authority (TVA) for further processing. To cope with a project cost reduction, the LEU Loading Station concept has changed from an enclosed building with air-conditioning to a partially enclosed building without air conditioning. The LEU Loading Station is within a radiological contaminated area; two pairs of coveralls and negative pressure respirator are required. As a result, inclement weather conditions, especially heat stress, will affect and impact the LEU loading operations. The purposes of the study are to determine the climatological impacts on LEU Loading operations, resources required for committed throughputs, and to find out the optimum process pathways for multi crews working simultaneously in the space-lim ited LEU Loading Station

  14. Low Thermal Conductivity, High Durability Thermal Barrier Coatings for IGCC Environments

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, Eric [Univ. of Connecticut, Storrs, CT (United States); Gell, Maurice [Univ. of Connecticut, Storrs, CT (United States)

    2015-01-15

    Advanced thermal barrier coatings (TBC) are crucial to improved energy efficiency in next generation gas turbine engines. The use of traditional topcoat materials, e.g. yttria-stabilized zirconia (YSZ), is limited at elevated temperatures due to (1) the accelerated undesirable phase transformations and (2) corrosive attacks by calcium-magnesium-aluminum-silicate (CMAS) deposits and moisture. The first goal of this project is to use the Solution Precursor Plasma Spray (SPPS) process to further reduce the thermal conductivity of YSZ TBCs by introducing a unique microstructural feature of layered porosity, called inter-pass boundaries (IPBs). Extensive process optimization accompanied with hundreds of spray trials as well as associated SEM cross-section and laser-flash measurements, yielded a thermal conductivity as low as 0.62 Wm⁻¹K⁻¹ in SPPS YSZ TBCs, approximately 50% reduction of APS TBCs; while other engine critical properties, such as cyclic durability, erosion resistance and sintering resistance, were characterized to be equivalent or better than APS baselines. In addition, modifications were introduced to SPPS TBCs so as to enhance their resistance to CMAS under harsh IGCC environments. Several mitigation approaches were explored, including doping the coatings with Al₂O₃ and TiO₂, applying a CMAS infiltration-inhibiting surface layer, and filling topcoat cracks with blocking substances. The efficacy of all these modifications was assessed with a set of novel CMAS-TBC interaction tests, and the moisture resistance was tested in a custom-built high-temperature moisture rig. In the end, the optimal low thermal conductivity TBC system was selected based on all evaluation tests and its processing conditions were documented. The optimal coating consisted on a thick inner layer of YSZ coating made by the SPPS process having a thermal conductivity 50% lower than standard YSZ coatings topped with a high temperature tolerant CMAS resistant gadolinium

  15. Environmental Assessment for Lignite Fuel Enhancement Project, Coal Creek Station, Great River Energy, Underwood, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-01-16

    The US Department of Energy (DOE) has prepared this EA to assess the environmental impacts of the commercial application of lignite fuel enhancement. The proposed demonstration project would be implemented at Great River Energy's Coal Creek Station near Underwood, North Dakota. The proposed project would demonstrate a technology to increase the heating value of lignite and other high-moisture coals by reducing the moisture in the fuels. Waste heat that would normally be sent to the cooling towers would be used to drive off a percentage of the moisture contained within the lignite. Application of this technology would be expected to boost power-generating efficiencies, provide economic cost savings for lignite and sub-bituminous power plants, and reduce air emissions. The proposed project would be constructed on a previously disturbed site within the Coal Creek Station and no negative impacts would occur in any environmental resource area.

  16. Waste management for Shippingport Station Decommissioning Project: Extended summary

    International Nuclear Information System (INIS)

    Mullee, G.R.; Schulmeister, A.R.

    1987-01-01

    The Shippingport Station (SSDP) is demonstrating that the techniques and methodologies of waste management, which are currently employed by the nuclear industry, provide adequate management and control of waste activities for the decommissioning of a large scale nuclear plant. The SSDP has some unique aspects in that as part of the objective to promote technology transfer, multiple subcontractors are being utilized in the project. The interfaces resulting from multiple subcontractors require additional controls. Effective control has been accomplished by the use of a process control and inventory system, coupled with personnel training in waste management activities. This report summarizes the waste management plan and provides a status of waste management activities for SSDP

  17. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  18. Method and system to estimate variables in an integrated gasification combined cycle (IGCC) plant

    Science.gov (United States)

    Kumar, Aditya; Shi, Ruijie; Dokucu, Mustafa

    2013-09-17

    System and method to estimate variables in an integrated gasification combined cycle (IGCC) plant are provided. The system includes a sensor suite to measure respective plant input and output variables. An extended Kalman filter (EKF) receives sensed plant input variables and includes a dynamic model to generate a plurality of plant state estimates and a covariance matrix for the state estimates. A preemptive-constraining processor is configured to preemptively constrain the state estimates and covariance matrix to be free of constraint violations. A measurement-correction processor may be configured to correct constrained state estimates and a constrained covariance matrix based on processing of sensed plant output variables. The measurement-correction processor is coupled to update the dynamic model with corrected state estimates and a corrected covariance matrix. The updated dynamic model may be configured to estimate values for at least one plant variable not originally sensed by the sensor suite.

  19. WVU Hydrogen Fuel Dispensing Station

    Energy Technology Data Exchange (ETDEWEB)

    Davis, William [West Virginia University Research Corporation, Morgantown, WV (United States)

    2015-09-01

    The scope of this project was changed during the course of the project. Phase I of the project was to construct a site similar to the site at Central West Virginia Regional Airport in Charleston, WV to show that duplication of the site was a feasible method of conducting hydrogen stations. Phase II of the project was necessitated due to a lack of funding that was planned for the development of the station in Morgantown. The US Department of Energy determined that the station in Charleston would be dismantled and moved to Morgantown and reassembled at the Morgantown site. This necessitated storage of the components of the station for almost a year at the NAFTC Headquarters which caused a number of issues with the equipment that will be discussed in later portions of this report. This report will consist of PHASE I and PHASE II with discussions on each of the tasks scheduled for each phase of the project.

  20. Killingholme clean coal/carbon capture and storage project

    Energy Technology Data Exchange (ETDEWEB)

    Periselneris, J.; Atherton, D.; Read, A. [E.ON UK, Coventry (United Kingdom)

    2007-07-01

    Integrated Gasification Combined Cycle (IGCC), is seen as one of the key bridging technologies in the deployment of CCS. To this effect, E.ON UK is developing plans for a large scale demonstration unit based on IGCC technology to be sited on the East coast of England. The provisional location is close to E.ON's existing CCGT at Killingholme in Lincolnshire. This paper details E.ON UK's main drivers and goals and the development of the plant itself. 8 figs.

  1. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  2. Development of low head Kaplan turbine for power station rehabilitation project

    Science.gov (United States)

    Lim, S. M.; Ohtake, N.; Kurosawa, S.; Suzuki, T.; Yamasaki, T.; Nishi, H.

    2012-11-01

    This paper presents the latest Kaplan turbine rehabilitation project for Funagira Power Station in Japan completed by J-POWER Group in collaboration with Toshiba Corporation. Area of rehabilitation was restricted to guide vane and runner. The main goal of the rehabilitation project was to expand the operating range of the existing turbine in terms of discharge and power with high operational stability, low noise as well as high cavitation performance. Computational Fluids Dynamics and model test were used to optimize the shape of guide vane and runner in development stage. Finally, field tests and runner inspection were carried out to confirm the performance of the new turbine. It was found that the new turbine has excellent performance in efficiency, power output, operational stability compared with existing turbine. Moreover, no sign of cavitation on the runner blade surface was observed after 5078 hours of operation near 100% load.

  3. Development of low head Kaplan turbine for power station rehabilitation project

    International Nuclear Information System (INIS)

    Lim, S M; Ohtake, N; Kurosawa, S; Suzuki, T; Yamasaki, T; Nishi, H

    2012-01-01

    This paper presents the latest Kaplan turbine rehabilitation project for Funagira Power Station in Japan completed by J-POWER Group in collaboration with Toshiba Corporation. Area of rehabilitation was restricted to guide vane and runner. The main goal of the rehabilitation project was to expand the operating range of the existing turbine in terms of discharge and power with high operational stability, low noise as well as high cavitation performance. Computational Fluids Dynamics and model test were used to optimize the shape of guide vane and runner in development stage. Finally, field tests and runner inspection were carried out to confirm the performance of the new turbine. It was found that the new turbine has excellent performance in efficiency, power output, operational stability compared with existing turbine. Moreover, no sign of cavitation on the runner blade surface was observed after 5078 hours of operation near 100% load.

  4. Shippingport Station Decommissioning Project: Removal of piping and equipment and removal of primary system components

    International Nuclear Information System (INIS)

    1989-01-01

    This report is a technical synopsis of the removal of contaminated and non-contaminated piping and equipment from the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document dismantling activities in support of reactor decommissioning. 5 refs., 29 figs., 4 tabs

  5. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  6. International Space Station Medical Projects - Full Services to Mars

    Science.gov (United States)

    Pietrzyk, R. A.; Primeaux, L. L.; Wood, S. J.; Vessay, W. B.; Platts, S. H.

    2018-01-01

    The International Space Station Medical Projects (ISSMP) Element provides planning, integration, and implementation services for HRP research studies for both spaceflight and flight analog research. Through the implementation of these two efforts, ISSMP offers an innovative way of guiding research decisions to meet the unique challenges of understanding the human risks to space exploration. Flight services provided by ISSMP include leading informed consent briefings, developing and validating in-flight crew procedures, providing ISS crew and ground-controller training, real-time experiment monitoring, on-orbit experiment and hardware operations and facilitating data transfer to investigators. For analog studies at the NASA Human Exploration Research Analog (HERA), the ISSMP team provides subject recruitment and screening, science requirements integration, data collection schedules, data sharing agreements, mission scenarios and facilities to support investigators. The ISSMP also serves as the HRP interface to external analog providers including the :envihab bed rest facility (Cologne, Germany), NEK isolation chamber (Moscow, Russia) and the Antarctica research stations. Investigators working in either spaceflight or analog environments requires a coordinated effort between NASA and the investigators. The interdisciplinary nature of both flight and analog research requires investigators to be aware of concurrent research studies and take into account potential confounding factors that may impact their research objectives. Investigators must define clear research requirements, participate in Investigator Working Group meetings, obtain human use approvals, and provide study-specific training, sample and data collection and procedures all while adhering to schedule deadlines. These science requirements define the technical, functional and performance operations to meet the research objectives. The ISSMP maintains an expert team of professionals with the knowledge and

  7. The controlled ecological life support system Antarctic analog project: Analysis of wastewater from the South Pole Station, Antarctica, volume 1

    Science.gov (United States)

    Flynn, Michael T.; Bubenheim, David L.; Straight, Christian L.; Belisle, Warren

    1994-01-01

    The Controlled Ecological Life Support system (CELSS) Antarctic Analog Project (CAAP) is a joint National Science Foundation (NSF) and NASA project for the development, deployment and operation of CELSS technologies at the Amundsen-Scott South Pole Station. NASA goals are operational testing of CELSS technologies and the conduct of scientific studies to facilitate technology selection and system design. The NSF goals are that the food production, water purification, and waste treatment capabilities which will be provided by CAAP will improve the quality of life for the South Pole inhabitants, reduce logistics dependence, and minimize environmental impacts associated with human presence on the polar plateau. This report presents an analysis of wastewater samples taken from the Amundsen-Scott South Pole Station, Antarctica. The purpose of the work is to develop a quantitative understanding of the characteristics of domestic sewage streams at the South Pole Station. This information will contribute to the design of a proposed plant growth/waste treatment system which is part of the CELSS Antarctic Analog Project (CAAP).

  8. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  9. Secure base stations

    NARCIS (Netherlands)

    Bosch, Peter; Brusilovsky, Alec; McLellan, Rae; Mullender, Sape J.; Polakos, Paul

    2009-01-01

    With the introduction of the third generation (3G) Universal Mobile Telecommunications System (UMTS) base station router (BSR) and fourth generation (4G) base stations, such as the 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) Evolved Node B (eNB), it has become important to

  10. GULF OF MEXICO SEAFLOOR STABILITY AND GAS HYDRATE MONITORING STATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Robert Woolsey; Thomas M. McGee; Robin C. Buchannon

    2004-11-01

    The gas hydrates research Consortium (HRC), established and administered at the University if Mississippi's Center for Marine Research and Environmental Technology (CMRET) has been active on many fronts in FY 03. Extension of the original contract through March 2004, has allowed completion of many projects that were incomplete at the end of the original project period due, primarily, to severe weather and difficulties in rescheduling test cruises. The primary objective of the Consortium, to design and emplace a remote sea floor station for the monitoring of gas hydrates in the Gulf of Mexico by the year 2005 remains intact. However, the possibility of levering HRC research off of the Joint Industries Program (JIP) became a possibility that has demanded reevaluation of some of the fundamental assumptions of the station format. These provisions are discussed in Appendix A. Landmark achievements of FY03 include: (1) Continuation of Consortium development with new researchers and additional areas of research contribution being incorporated into the project. During this period, NOAA's National Undersea Research Program's (NURP) National Institute for Undersea Science and Technology (NIUST) became a Consortium funding partner, joining DOE and Minerals Management Service (MMS); (2) Very successful annual and semiannual meetings in Oxford Mississippi in February and September, 2003; (3) Collection of piston cores from MC798 in support of the effort to evaluate the site for possible monitoring station installation; (4) Completion of the site evaluation effort including reports of all localities in the northern Gulf of Mexico where hydrates have been documented or are strongly suspected to exist on the sea floor or in the shallow subsurface; (5) Collection and preliminary evaluation of vent gases and core samples of hydrate from sites in Green Canyon and Mississippi Canyon, northern Gulf of Mexico; (6) Monitoring of gas activity on the sea floor, acoustically

  11. Developmental state and perspectives of USSR power stations, espec. nuclear power stations

    International Nuclear Information System (INIS)

    1983-01-01

    According to the resolutions of the 25th and 26th party congresses of the CPSU, the Soviet electric and thermal energy economy envisages as the mainstreams in development: Energy projects based on nuclear fuel, i.e. nuclear power stations (NPS), nuclear heat- and -power stations (NHPS) and nuclear heat stations (NHS); fuel-energy complexes: Ekibastuz, Kansk-Achinsk, West-Siberian complex (Tyumen); power stations utilizing non-conventional regenerative energy sources, i.e. solar, geothermal, MHD power stations. Further down, an overview is given on the developmental perspectives of nuclear-heat and nuclear-power economy and on the development of energy management based on fossil fuels. (orig./UA) [de

  12. Project of a Near-Real-Time Sismo-acoustic Submarine Station for offshore monitoring (NRTSSS)

    Science.gov (United States)

    D'Anna, G.; Calore, D.; Mangano, G.; D'Alessandro, A.; Favali, P.

    2011-12-01

    The INGV seismic network ensures reliable and continuous monitoring of the Italian territory. However, the peculiarity of the Italian peninsula, characterised by an intense offshore geodynamic and seismic activity, requires the extension of the seismic monitoring to the sea. The aim of this project is: - to identify bottleneck is related to the construction, installation and use of underwater seismic station; - to define the most appropriate and low-cost architecture to guarantee the minimum functionality required for a seismic station. In order to obtain reliable seafloor seismic signals integrated to land-based network, the requirements to be fulfill are: - an acceptable coupling with the seabed; - the orientation of the components with respect to the magnetic North and to the verticality; - the correct time stamp of the data; - the data transfer to the land for the integration. Currently, the optimal solution for offshore seismic station is a cable connection to power and real-time data transfer, like the case of Western Ionian Sea cabled observatory, one of the operative node of the EMSO research infrastructure (European Multidisciplinary Seafloor and water column Observatory, http://emso-eu.org). But in the Mediterranean many seismic areas are located a few tens-hundreds of miles from the coast and cabled solutions are not feasible essentially for economic reasons. For this kind of installations EMSO research infrastructure foresees no-cabled solution, that requires a surface buoy deployed in the vicinity seafloor modules.This project plans to develop a surface buoy equipped with autonomous power supply system to power also the seafloor platforms and two-way communication system enabling the data transfer through latest generation of broadband radio communication or satellite link (Fig. 1). All the components of the prototype system are described.

  13. Hydrogen Filling Station

    Energy Technology Data Exchange (ETDEWEB)

    Boehm, Robert F; Sabacky, Bruce; Anderson II, Everett B; Haberman, David; Al-Hassin, Mowafak; He, Xiaoming; Morriseau, Brian

    2010-02-24

    Hydrogen is an environmentally attractive transportation fuel that has the potential to displace fossil fuels. The Freedom CAR and Freedom FUEL initiatives emphasize the importance of hydrogen as a future transportation fuel. Presently, Las Vegas has one hydrogen fueling station powered by natural gas. However, the use of traditional sources of energy to produce hydrogen does not maximize the benefit. The hydrogen fueling station developed under this grant used electrolysis units and solar energy to produce hydrogen fuel. Water and electricity are furnished to the unit and the output is hydrogen and oxygen. Three vehicles were converted to utilize the hydrogen produced at the station. The vehicles were all equipped with different types of technologies. The vehicles were used in the day-to-day operation of the Las Vegas Valley Water District and monitoring was performed on efficiency, reliability and maintenance requirements. The research and demonstration utilized for the reconfiguration of these vehicles could lead to new technologies in vehicle development that could make hydrogen-fueled vehicles more cost effective, economical, efficient and more widely used. In order to advance the development of a hydrogen future in Southern Nevada, project partners recognized a need to bring various entities involved in hydrogen development and deployment together as a means of sharing knowledge and eliminating duplication of efforts. A road-mapping session was held in Las Vegas in June 2006. The Nevada State Energy Office, representatives from DOE, DOE contractors and LANL, NETL, NREL were present. Leadership from the National hydrogen Association Board of Directors also attended. As a result of this session, a roadmap for hydrogen development was created. This roadmap has the ability to become a tool for use by other road-mapping efforts in the hydrogen community. It could also become a standard template for other states or even countries to approach planning for a hydrogen

  14. Decommissioning of nuclear power stations in community countries carried out and projected

    International Nuclear Information System (INIS)

    Cregut, A.; Gregory, A.R.

    1984-01-01

    The decommissioning of large plants such as nuclear power stations merits an approach requiring the introduction of measures and procedures allowing them to be dealt with efficiently; this efficiency would imply concern for optimum economy of operations while respecting the safety and protection rules inherent in nuclear energy. Consequently, plant owners require: the tactical and policy elements to guide them in their decisions and choices; efficient tools, equipment and processes which meet their needs; information gained from experience of decommissioning already carried out which would provide them with a verified background knowledge when dealing with problems. Since decommissioning experience to date has not made it possible to draw up codes and guidelines, it is important to review the work carried out by Community countries in particular on the decommissioning of nuclear power plants. The following paper does not claim to be exhaustive or to make value judgements. Its aim is to list the nuclear power stations shut down in Community countries, to outline the decommissioning levels selected in each case and to underline some interesting aspects of the technical options. In conclusion it will review what appeared to be the difficulties common to the various projects. (author)

  15. Design and evaluation of an IGCC power plant using iron-based syngas chemical-looping (SCL) combustion

    International Nuclear Information System (INIS)

    Sorgenfrei, Max; Tsatsaronis, George

    2014-01-01

    Highlights: • A new concept for power generation including carbon capture was found. • The air reactor temperature significantly influences the net efficiency. • The use of a CO 2 turbine decreases the net efficiency. • Compared to a conventional IGCC with 90% CO 2 capture the net efficiency increases. - Abstract: Chemical-looping combustion (CLC) is a novel and promising combustion technology with inherent separation of the greenhouse gas CO 2 . This paper focuses on the design and thermodynamic evaluation of an integrated gasification combined-cycle (IGCC) process using syngas chemical looping (SCL) combustion for generating electricity. The syngas is provided by coal gasification; the gas from the gasifier is cleaned using high-temperature gas desulfurization (HGD). In this study, the oxygen carrier iron oxide (Fe 2 O 3 ) is selected to oxidize the syngas in a multistage moving-bed reactor. The resulting reduced iron particles then consist of FeO and Fe 3 O 4 . To create a closed-cycle operation, these particles are partially re-oxidized with steam in a fluidized-bed regenerator to pure Fe 3 O 4 and then fully re-oxidized in a fluidized-bed air combustor to Fe 2 O 3 . One advantage of this process is the co-production of hydrogen diluted with water vapor within the steam regenerator. Both the HGD and CLC systems are not under commercial operation so far. This mixture is fed to a gas turbine for the purpose of generating electricity. The gas turbine is expected to exhibit low NO x emissions due to the high ratio of water in the combustion chamber. Cooling the flue gas in the HRSG condenses the water vapor to yield high-purity CO 2 for subsequent compression and disposal. To evaluate the net efficiency, two conventional syngas gasifiers are considered, namely the BGL slagging gasifier and the Shell entrained-flow gasifier. The option of using a CO 2 turbine after the SCL-fuel reactor is also investigated. A sensitivity analysis is performed on the SCL

  16. Eco-technology service station: the future of gas station; Posto eco-tecnologico: o posto do futuro

    Energy Technology Data Exchange (ETDEWEB)

    Moura, Newton R. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Daher, Humberto Antonio S. [PETROBRAS Distribuidora, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    PETROBRAS Distribuidora and CENPES have a project to build an eco-technology service station at Ilha do Fundao, to know new technologies for vehicle fuelling, test of new vehicle natural gas compression system, and start projects with new fuels that are not available at Brazilian market. This service station concept shall be aligned with sustainability premise that are being established for both companies, that means, besides a technology focus, it shall have a social focus without any environment damage. PETROBRAS 'Board of Directors approved the expansion of PETROBRAS' Research and Development Center (CENPES) installations, including this service station construction. Some activities that will be developed at the service station are pointed out here: available of new natural gas compression system; micro-generation with micro turbine, fuel cell; and photo-voltaic cell technologies; hydrogen fuelling; oil-water system treatment; biodiesel fuelling. This station will have a show room opened to the public, with panels, videos and a CNG compressor in cut. (author)

  17. Physical decommissioning of the Shippingport Atomic Power Station

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1988-01-01

    The Shippingport Atomic Power Station consists of the nuclear steam supply system and associated radioactive waste processing systems, which are owned by the United States Department of Energy (USDOE), and the turbine-generator and balance of plant which is owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania on seven acres of land leased by USDOE from the Duquesne Light Company. The Shippingport Station Decommissioning Project (SSDP) is being managed for the USDOE by the General Electric Company and its integated subcontractor, Morrison Knudsen-Ferguson (MK-F) Company. The objectives of the Shippingport Station Decommissioning Project (SSDP) are to: Demonstrate the safe and cost effective dismantlement of a large scale nuclear power plant; Provide useful data for future decommissioning projects

  18. Integrated gasification combined-cycle research development and demonstration activities in the US

    Energy Technology Data Exchange (ETDEWEB)

    Ness, H.M.; Brdar, R.D.

    1996-09-01

    The United States Department of Energy (DOE)`s Office of Fossil Energy, Morgantown Energy Technology Center, is managing a research development and demonstration (RD&D) program that supports the commercialization of integrated gasification combined-cycle (IGCC) advanced power systems. This overview briefly describes the supporting RD&D activities and the IGCC projects selected for demonstration in the Clean Coal Technology (CCT) Program.

  19. Spherical Projection Based Straight Line Segment Extraction for Single Station Terrestrial Laser Point Cloud

    Directory of Open Access Journals (Sweden)

    ZHANG Fan

    2015-06-01

    Full Text Available Due to the discrete distribution computing errors and lack of adaptability are ubiquitous in the current straight line extraction for TLS data methods. A 3D straight line segment extraction method is proposed based on spherical projection for single station terrestrial laser point clouds. Firstly, horizontal and vertical angles of each laser point are calculated by means of spherical coordinates, intensity panoramic image according to the two angles is generated. Secondly, edges which include straight line features are detected from intensity panoramic image by using of edge detection algorithm. Thirdly, great circles are detected from edges of panoramic image using spherical Hough transform. According to the axiom that a straight line segment in 3D space is a spherical great circle after spherical projection, detecting great circles from spherical projected data sets is essentially detecting straight line segments from 3D data sets without spherical projection. Finally, a robust 3D straight line fitting method is employed to fitting the straight lines and calculating parameters of the straight line segments. Experiments using different data sets and comparison with other methods show the accuracy and applicability of the proposed method.

  20. [STEM on Station Education

    Science.gov (United States)

    Lundebjerg, Kristen

    2016-01-01

    The STEM on Station team is part of Education which is part of the External Relations organization (ERO). ERO has traditional goals based around BHAG (Big Hairy Audacious Goal). The BHAG model is simplified to a saying: Everything we do stimulates actions by others to advance human space exploration. The STEM on Station education initiate is a project focused on bringing off the earth research and learning into classrooms. Educational resources such as lesson plans, activities to connect with the space station and STEM related contests are available and hosted by the STEM on Station team along with their partners such as Texas Instruments. These educational activities engage teachers and students in the current happenings aboard the international space station, inspiring the next generation of space explorers.

  1. USRCRN Station Information

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Documentation of United States Regional Climate Reference Network (USRCRN) installations in 2009. Installations documented are for USRCRN pilot project stations in...

  2. Establishment of Karadeniz Technical University Permanent GNSS Station as Reactivated of TRAB IGS Station

    Directory of Open Access Journals (Sweden)

    Kazancı Selma Zengin

    2017-12-01

    Full Text Available In recent years, Global Navigation Satellite Systems (GNSS have gained great importance in terms of the benefi ts it provides such as precise geodetic point positioning, determining crustal deformations, navigation, vehicle monitoring systems and meteorological applications etc. As in Turkey, for this purpose, each country has set up its own GNSS station networks like Turkish National Permanent RTK Network analyzed precise station coordinates and velocities together with the International GNSS Service, Turkish National Fundamental GPS Network and Turkish National Permanent GNSS Network (TNPGN stations not only are utilized as precise positioning but also GNSS meteorology studies so total number of stations are increased. This work is related to the reactivated of the TRAB IGS station which was established in Karadeniz Technical University, Department of Geomatics Engineering. Within the COST ES1206 Action (GNSS4SWEC KTU analysis center was established and Trop-NET system developed by Geodetic Observatory Pecny (GOP, RIGTC in order to troposphere monitoring. The project titled “Using Regional GNSS Networks to Strengthen Severe Weather Prediction” was accepted to the scientifi c and technological research council of Turkey (TUBITAK. With this project, we will design 2 new constructed GNSS reference station network. Using observation data of network, we will compare water vapor distribution derived by GNSS Meteorology and GNSS Tomography. At this time, KTU AC was accepted as E-GVAP Analysis Centre in December 2016. KTU reference station is aimed to be a member of the EUREF network with these studies.

  3. Establishment of Karadeniz Technical University Permanent GNSS Station as Reactivated of TRAB IGS Station

    Science.gov (United States)

    Kazancı, Selma Zengin; Kayıkçı, Emine Tanır

    2017-12-01

    In recent years, Global Navigation Satellite Systems (GNSS) have gained great importance in terms of the benefi ts it provides such as precise geodetic point positioning, determining crustal deformations, navigation, vehicle monitoring systems and meteorological applications etc. As in Turkey, for this purpose, each country has set up its own GNSS station networks like Turkish National Permanent RTK Network analyzed precise station coordinates and velocities together with the International GNSS Service, Turkish National Fundamental GPS Network and Turkish National Permanent GNSS Network (TNPGN) stations not only are utilized as precise positioning but also GNSS meteorology studies so total number of stations are increased. This work is related to the reactivated of the TRAB IGS station which was established in Karadeniz Technical University, Department of Geomatics Engineering. Within the COST ES1206 Action (GNSS4SWEC) KTU analysis center was established and Trop-NET system developed by Geodetic Observatory Pecny (GOP, RIGTC) in order to troposphere monitoring. The project titled "Using Regional GNSS Networks to Strengthen Severe Weather Prediction" was accepted to the scientifi c and technological research council of Turkey (TUBITAK). With this project, we will design 2 new constructed GNSS reference station network. Using observation data of network, we will compare water vapor distribution derived by GNSS Meteorology and GNSS Tomography. At this time, KTU AC was accepted as E-GVAP Analysis Centre in December 2016. KTU reference station is aimed to be a member of the EUREF network with these studies.

  4. California Hydrogen Infrastructure Project

    Energy Technology Data Exchange (ETDEWEB)

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling

  5. Merchant funding for power stations

    International Nuclear Information System (INIS)

    Johnston, B.; Bartlam, M.

    1997-01-01

    The next frontier for project finance is merchant generation: the financing of IPPs without long-term offtake contracts. Banks are just beginning to finance merchant generation power stations. One of the first was Destec's Indian Queens project in Cornwall, UK. Bruce Johnston and Martin Bartlam of Wilde Sapte discuss the project. (UK)

  6. International remote monitoring project Argentina Nuclear Power Station Spent Fuel Transfer Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, S.; Lucero, R.; Glidewell, D.

    1997-01-01

    The Autoridad Regulataria Nuclear (ARN) and the United States Department of Energy (DOE) are cooperating on the development of a Remote Monitoring System for nuclear nonproliferation efforts. A Remote Monitoring System for spent fuel transfer will be installed at the Argentina Nuclear Power Station in Embalse, Argentina. The system has been designed by Sandia National Laboratories (SNL), with Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) providing gamma and neutron sensors. This project will test and evaluate the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguards efficiency. This paper provides a description of the monitoring system and its functions. The Remote Monitoring System consists of gamma and neutron radiation sensors, RF systems, and video systems integrated into a coherent functioning whole. All sensor data communicate over an Echelon LonWorks Network to a single data logger. The Neumann DCM 14 video module is integrated into the Remote Monitoring System. All sensor and image data are stored on a Data Acquisition System (DAS) and archived and reviewed on a Data and Image Review Station (DIRS). Conventional phone lines are used as the telecommunications link to transmit on-site collected data and images to remote locations. The data and images are authenticated before transmission. Data review stations will be installed at ARN in Buenos Aires, Argentina, ABACC in Rio De Janeiro, IAEA Headquarters in Vienna, and Sandia National Laboratories in Albuquerque, New Mexico. 2 refs., 2 figs

  7. Steam Pressure-Reducing Station Safety and Energy Efficiency Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    Lower, Mark D [ORNL; Christopher, Timothy W [ORNL; Oland, C Barry [ORNL

    2011-06-01

    The Facilities and Operations (F&O) Directorate is sponsoring a continuous process improvement (CPI) program. Its purpose is to stimulate, promote, and sustain a culture of improvement throughout all levels of the organization. The CPI program ensures that a scientific and repeatable process exists for improving the delivery of F&O products and services in support of Oak Ridge National Laboratory (ORNL) Management Systems. Strategic objectives of the CPI program include achieving excellence in laboratory operations in the areas of safety, health, and the environment. Identifying and promoting opportunities for achieving the following critical outcomes are important business goals of the CPI program: improved safety performance; process focused on consumer needs; modern and secure campus; flexibility to respond to changing laboratory needs; bench strength for the future; and elimination of legacy issues. The Steam Pressure-Reducing Station (SPRS) Safety and Energy Efficiency Improvement Project, which is under the CPI program, focuses on maintaining and upgrading SPRSs that are part of the ORNL steam distribution network. This steam pipe network transports steam produced at the ORNL steam plant to many buildings in the main campus site. The SPRS Safety and Energy Efficiency Improvement Project promotes excellence in laboratory operations by (1) improving personnel safety, (2) decreasing fuel consumption through improved steam system energy efficiency, and (3) achieving compliance with applicable worker health and safety requirements. The SPRS Safety and Energy Efficiency Improvement Project being performed by F&O is helping ORNL improve both energy efficiency and worker safety by modifying, maintaining, and repairing SPRSs. Since work began in 2006, numerous energy-wasting steam leaks have been eliminated, heat losses from uninsulated steam pipe surfaces have been reduced, and deficient pressure retaining components have been replaced. These improvements helped ORNL

  8. Application for the Tape Station

    CERN Document Server

    Solero, A

    2003-01-01

    The Tape Station is used as an Isolde facility to observe the variations of intensity and the lifespan of certain isotopes. A Siemens Simatic FM-352-5 module controls the Tape Station in a PLC system then a DSC controls the PLC, which will be controlled the Tape station program. During the Isolde consolidation project, the Tape Station has been rebuilt, and the control system has been fully integrated in the PS control. Finally, a new application has been written in JAVA Development kit 1.4 and the PS Java environment. The main purpose of this note is to explain how to use this program.

  9. Proceedings of the Flat-Plate Solar Array Project Research Forum on the Design of Flat-Plate Photovoltaic Arrays for Central Stations

    Science.gov (United States)

    1983-01-01

    The Flat Plate Solar Array Project, focuses on advancing technologies relevant to the design and construction of megawatt level central station systems. Photovoltaic modules and arrays for flat plate central station or other large scale electric power production facilities require the establishment of a technical base that resolves design issues and results in practical and cost effective configurations. Design, qualification and maintenance issues related to central station arrays derived from the engineering and operating experiences of early applications and parallel laboratory reserch activities are investigated. Technical issues are examined from the viewpoint of the utility engineer, architect/engineer and laboratory researcher. Topics on optimum source circuit designs, module insulation design for high system voltages, array safety, structural interface design, measurements, and array operation and maintenance are discussed.

  10. The Sewer Research Station in Frejlev

    DEFF Research Database (Denmark)

    Schaarup-Jensen, Kjeld; Hvitved-Jacobsen, T.

    This report for the 2000 activities at the sewer research station in Frejlev. Only few - if any - sewer monitoring stations like the one in Frejlev exist. Without no doubt the field data produced - especially the time series - in the course of time will serve as a unique basis for projects dealin...

  11. The Sewer Research Station in Frejlev

    DEFF Research Database (Denmark)

    Hvitved-Jacobsen, Thorkild; Schaarup-Jensen, Kjeld

    This report for the 1999 activities at the sewer research station in Frejlev. Only few - if any - sewer monitoring stations like the one in Frejlev exist. Without no doubt the field data produced - especially the time series - in the course of time will serve as a unigue basis for projects dealin...

  12. A collaborative network middleware project by Lambda Station, TeraPaths, and Phoebus

    International Nuclear Information System (INIS)

    Bobyshev, A.; Bradley, S.; Crawford, M.; DeMar, P.; Katramatos, D.; Shroff, K.; Swany, M.; Yu, D.

    2010-01-01

    The TeraPaths, Lambda Station, and Phoebus projects, funded by the US Department of Energy, have successfully developed network middleware services that establish on-demand and manage true end-to-end, Quality-of-Service (QoS) aware, virtual network paths across multiple administrative network domains, select network paths and gracefully reroute traffic over these dynamic paths, and streamline traffic between packet and circuit networks using transparent gateways. These services improve network QoS and performance for applications, playing a critical role in the effective use of emerging dynamic circuit network services. They provide interfaces to applications, such as dCache SRM, translate network service requests into network device configurations, and coordinate with each other to setup up end-to-end network paths. The End Site Control Plane Subsystem (ESCPS) builds upon the success of the three projects by combining their individual capabilities into the next generation of network middleware. ESCPS addresses challenges such as cross-domain control plane signalling and interoperability, authentication and authorization in a Grid environment, topology discovery, and dynamic status tracking. The new network middleware will take full advantage of the perfSONAR monitoring infrastructure and the Inter-Domain Control plane efforts and will be deployed and fully vetted in the Large Hadron Collider data movement environment.

  13. Risk impact of planned maintenance configuration at South Texas Project Electric Generating Station

    International Nuclear Information System (INIS)

    Loh, W.T.; Fleming, K.N.; Grantom, C.R.

    2004-01-01

    This paper is based on a study done for the Houston Lighting and Power Company. The purpose of this study is to estimate the risk impact of planned maintenance configurations at South Texas Project Electric Generating Station (STPEGS). To date, the focus of the STP probabilistic safety assessment (PSA) program has been to analyze risk in terms of estimates of accident frequencies that are expressed on a time-averaged basis. Thus, estimates of quantities such as severe core damage frequency have been made such that the temporal variations of this frequency with changing plant configurations are averaged out over time. The only condition that has been imposed on these estimates is that the plant is initially operating at full power when potential initiating events might occur. (author)

  14. Risk management of the North Anna Power Station Service Water System Preservation Project using the IPE model

    International Nuclear Information System (INIS)

    Afzali, A.; Donovan, M.D.; Sartain, M.D.; Bankley, A.V.

    1993-01-01

    This paper discusses the application of the North Anna Power Station Individual Plant Examination (IPE) models in PRA study of the Service Water System Preservation Project (SWSPP). The service water project involves repair and restoration of the Service Water System (SWS) piping and will require excavation of the buried SWS lines in addition to temporarily removing one of the two redundant SWS loops from operation. The SWSPP will be carried out with one or both units in normal operation. The objective of the PRA study was to quantify the risk impact (as measured by the change in Core Damage Frequency (ΔCDF)) of the SWSPP and to identify and evaluate countermeasures to reduce the risk impact of the project activities. The study concluded that the ΔCDF would be acceptable by undertaking preventative measures and by providing additional accident mitigating measures during performance of the SWSPP activities

  15. Refurbishment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Thompson, P.D.; Jaitly, R.; Ichiyen, N.; Petrilli, M.A.

    2004-01-01

    NB Power is planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube Assemblies and the connecting feeder pipes. This activity is referred to as Retube. NB Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope of the project was determined from the outcome of a two-year study involving a detailed condition assessment of the station that examined issues relating to ageing and obsolescence. The majority of the plant components were found to be capable of supporting extended operation without needing replacement or changes. In addition to the condition assessment, a detailed review of Safety and Licensing issues associated with extended operation was performed. This included a review of known regulatory and safety issues, comparison of the station against current codes and standards, and comparison of the station against safety related modifications made to more recent CANDU 6 units. Benefit cost analyses (BCA) were performed to assist the utility in determining which changes were appropriate to include in the project scope. As a Probabilistic Safety Assessment (PSA) for PLGS did not exist at the time, a risk baseline for the station had to be determined for use in the BCA. Extensive dialogue with the Canadian Nuclear Safety Commission staff was also undertaken during this phase. A comprehensive Licensing Framework was produced upon which the CNSC provided feedback to NB Power. This feedback was important in terms of

  16. Inauguration of the ANDRA atmospheric station in Houdelaincourt; Inauguration de la station atmospherique de l'Andra a Houdelaincourt

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This document briefly presents the atmospheric monitoring station inaugurated in Houdelaincourt (Meuse) and installed by the ANDRA within the frame of the ICOS (Integrated Carbon Observing System) European infrastructure project which aims at developing air and greenhouse gas monitoring over Europe. It also recalls that this station is part of a set of means of monitoring, experimentation and protection of the environment within the frame of high and medium level nuclear waste storage project in Meuse and Haute-Marne. The document also proposes brief presentations of the different actors involved in the creation of this station: the LSCE (laboratory of sciences of climate and environment), Meteo-France, Air Lorraine, the IRSN, and the LGGE (laboratory of glaciology and geophysics of the environment)

  17. The Heysham 2 and Torness nuclear power station projects

    International Nuclear Information System (INIS)

    Cameron, P.J.

    1989-01-01

    At the beginning of the design of the Heysham 2 and Torness Nuclear Power Stations in the UK, it was agreed that the Hinkley Point B/Hunterston B Advanced Gas Cooled reactor design would be repeated. However, the Hinkley Point B/Hunterston B designs dated from 1964, and inevitably safety requirements had escalated in the intervening years. Furthermore, operating experience gained from Hinkley Point B/Hunterston B showed that it was desirable to make changes to particular features. Design changes were therefore included where it was considered essential to improve performance, to improve safety and to improve engineering. The resulting station designs are described. (author)

  18. 77 FR 59166 - South Mississippi Electric Cooperative: Plant Ratcliffe, Kemper County Integrated Gasification...

    Science.gov (United States)

    2012-09-26

    ... SMEPA lacks sufficient control and responsibility over the Project, RUS determined that financing SMEPA... Ratcliffe, Kemper County Integrated Gasification Combined-Cycle (IGCC) Project AGENCY: Rural Utilities..., Mississippi (the Project). The Acting Administrator of RUS has signed the ROD, which is effective on the...

  19. Future direction of air separation design for gasification, IGCC and alternative fuel projects

    Energy Technology Data Exchange (ETDEWEB)

    Allam, R.J.; Castel-Smith, H.; Smith, A.R.; Sorensen, J.C. [Air Products and Chemicals, Inc. (United States)

    1998-12-31

    Low pressure and elevated pressure cryogenic air separation units (ASUs) have successfully been applied to support gasification projects worldwide. ASU technology has ranged from traditional, low pressure, standalone facilities supplying products only to the gasification island, to highly integrated, elevated pressure facilities that obtain air feed from and inject excess nitrogen into a gas turbine. The near-term direction of ASUs is increased single unit capacity, process optimizations that will benefit integration with the new generation of higher pressure ratio and increased capacity gas turbines, and overall ASU facility optimization for the specialized requirements of shipboard units for remote gas conversion processes. Longer-term development is proceeding on compression and driver requirements to support cost improvements for 10,000 to 20,000 merit ton per day oxygen facilities for onshore or platform-based gas conversion processes. 8 refs., 4 figs., 1 tab.

  20. Future direction of air separation design for gasification, IGCC and alternative fuel projects

    Energy Technology Data Exchange (ETDEWEB)

    Allam, R.J.; Castel-Smith, H.; Smith, A.R.; Sorensen, J.C. (Air Products and Chemicals, Inc. (United States))

    1998-01-01

    Low pressure and elevated pressure cryogenic air separation units (ASUs) have successfully been applied to support gasification projects worldwide. ASU technology has ranged from traditional, low pressure, standalone facilities supplying products only to the gasification island, to highly integrated, elevated pressure facilities that obtain air feed from and inject excess nitrogen into a gas turbine. The near-term direction of ASUs is increased single unit capacity, process optimizations that will benefit integration with the new generation of higher pressure ratio and increased capacity gas turbines, and overall ASU facility optimization for the specialized requirements of shipboard units for remote gas conversion processes. Longer-term development is proceeding on compression and driver requirements to support cost improvements for 10,000 to 20,000 merit ton per day oxygen facilities for onshore or platform-based gas conversion processes. 8 refs., 4 figs., 1 tab.

  1. Mojave Base Station Implementation

    Science.gov (United States)

    Koscielski, C. G.

    1984-01-01

    A 12.2 meter diameter X-Y mount antenna was reconditioned for use by the crustal dynamic project as a fixed base station. System capabilities and characteristics and key performance parameters for subsystems are presented. The implementation is completed.

  2. NASA space station automation: AI-based technology review

    Science.gov (United States)

    Firschein, O.; Georgeff, M. P.; Park, W.; Neumann, P.; Kautz, W. H.; Levitt, K. N.; Rom, R. J.; Poggio, A. A.

    1985-01-01

    Research and Development projects in automation for the Space Station are discussed. Artificial Intelligence (AI) based automation technologies are planned to enhance crew safety through reduced need for EVA, increase crew productivity through the reduction of routine operations, increase space station autonomy, and augment space station capability through the use of teleoperation and robotics. AI technology will also be developed for the servicing of satellites at the Space Station, system monitoring and diagnosis, space manufacturing, and the assembly of large space structures.

  3. Characterizing toxic emissions from a coal-fired power plant demonstrating the AFGD ICCT Project and a plant utilizing a dry scrubber/baghouse system: Bailly Station Units 7 and 8 and AFGD ICCT Project. Final report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Dismukes, E.B.

    1994-10-20

    This report describes results of assessment of the risk of emissions of hazardous air pollutants at one of the electric power stations, Bailly Station, which is also the site of a Clean Coal Technology project demonstrating the Pure Air Advanced Flue Gas Desulfurization process (wet limestone). This station represents the configuration of no NO{sub x} reduction, particulate control with electrostatic precipitators, and SO{sub 2} control with a wet scrubber. The test was conducted September 3--6, 1993. Sixteen trace metals were determined along with 5 major metals. Other inorganic substances and organic compounds were also determined.

  4. Unconventional Coal in Wyoming: IGCC and Gasification of Direct Coal Liquefaction Residue

    Science.gov (United States)

    Schaffers, William Clemens

    Two unconventional uses for Wyoming Powder River Basin coal were investigated in this study. The first was the use of coal fired integrated gasification combined cycle (IGCC) plants to generate electricity. Twenty-eight different scenarios were modeled using AspenPlusRTM software. These included slurry, mechanical and dried fed gasifiers; Wyodak and Green River coals, 0%, 70%, and 90% CO2 capture; and conventional evaporative vs air cooling. All of the models were constructed on a feed basis of 6,900 tons of coal per day on an "as received basis". The AspenPlus RTM results were then used to create economic models using Microsoft RTM Excel for each configuration. These models assumed a 3 year construction period and a 30 year plant life. Results for capital and operating costs, yearly income, and internal rates of return (IRR) were compared. In addition, the scenarios were evaluated to compare electricity sales prices required to obtain a 12% IRR and to determine the effects of a carbon emissions tax on the sales price. The second part of the study investigated the gasification potential of residue remaining from solvent extraction or liquefaction of Powder River Basin Coal. Coal samples from the Decker mine on the Wyoming-Montana border were extracted with tetralin at a temperature of 360°C and pressure of 250 psi. Residue from the extraction was gasified with CO2 or steam at 833°C, 900°C and 975°C at pressures of 0.1 and 0.4 MPa. Product gases were analyzed with a mass spectrometer. Results were used to determine activation energies, reaction order, reaction rates and diffusion effects. Surface area and electron microscopic analyses were also performed on char produced from the solvent extraction residue.

  5. Process, background and design criteria of the gas cleaning at Puertollano IGCC

    Energy Technology Data Exchange (ETDEWEB)

    Pisa, J. [Elcogas, Madrid (Spain)

    1998-11-01

    The Puertollano IGCC plant selected cooling by a water-tube boiler with upstream quenching at high velocities that requires a dust-free cooling gas at not less than 250{degree}C in order not to penalise the heat recovery efficiency. A filtration system for gas dedusting in the 250{degree}C temperature range has been installed and will be commissioned at the end of 1997. The gas cleaning concept is completed with a Venturi Scrubber, a COS hydrolysis reactor and a MDEA column to strip the sulphuric acid to yield clean gas. The gasification island is based upon the PRENFLO system which is an entrained-flow system with dry feeding. The selection of the filter system arrangement considered the limited operational experience in comparable operating conditions and acknowledged the flexibility of the filter system versus the cyclone-scrubber as far as easier load variation operation, the reduction of residues needing deposition and increased slag flow, as well as easier maintenance. Additionally to the ceramic test filters in Furstenhausen (PRENFLO) and Deer Park near Houston (SHELL), ceramic candle-type filter were selected in Buggenum and at Wabash River, and for the KoBra plant. The main criteria for the selection of the filter system and the type of candle were: separation efficiency to match clean gas limits; uniform distribution of the dust-laden gas to the filters; wear-resistant routing of the dust-laden gas flow; need for a supporting structure which must cope with sudden pressure fluctuations; optimised pulse gas system; and maintenance and repair. Based upon the above criteria, the PRENFLO concept requirements and the gas turbine specification, an arrangement with two pressure filter vessels with LLB design and filter elements manufactured by Schumacher has been installed in Puertollano. 2 figs., 3 tabs.

  6. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  7. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  8. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  9. Solar-Assisted Electric Vehicle Charging Station Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Lapsa, Melissa Voss [ORNL; Durfee, Norman [ORNL; Maxey, L Curt [ORNL; Overbey, Randall M [ORNL

    2011-09-01

    Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data

  10. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  11. NASA space station automation: AI-based technology review. Executive summary

    Science.gov (United States)

    Firschein, O.; Georgeff, M. P.; Park, W.; Cheeseman, P. C.; Goldberg, J.; Neumann, P.; Kautz, W. H.; Levitt, K. N.; Rom, R. J.; Poggio, A. A.

    1985-01-01

    Research and Development projects in automation technology for the Space Station are described. Artificial Intelligence (AI) based technologies are planned to enhance crew safety through reduced need for EVA, increase crew productivity through the reduction of routine operations, increase space station autonomy, and augment space station capability through the use of teleoperation and robotics.

  12. Implementation of Biogas Stations into Smart Heating and Cooling Network

    Science.gov (United States)

    Milčák, P.; Konvička, J.; Jasenská, M.

    2016-10-01

    The paper is aimed at the description of implementation of a biogas station into software environment for the "Smart Heating and Cooling Networks". The aim of this project is creation of a software tool for preparation of operation and optimization of treatment of heat/cool in small regions. In this case, the biogas station represents a kind of renewable energy source, which, however, has its own operational specifics which need to be taken into account at the creation of an implementation project. For a specific biogas station, a detailed computational model was elaborated, which is parameterized in particular for an optimization of the total computational time.

  13. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  14. Solidifying power station resins and sludges

    International Nuclear Information System (INIS)

    Willis, A.S.D.; Haigh, C.P.

    1984-01-01

    Radioactive ion exchange resins and sludges arise at nuclear power stations from various operations associated with effluent treatment and liquid waste management. As the result of an intensive development programme, the Central Electricity Generating Board (CEGB) has designed a process to convert power station resins and sludges into a shielded, packaged solid monolithic form suitable for final disposal. Research and development, the generic CEGB sludge/resin conditioning plant and the CEGB Active Waste Project are described. (U.K.)

  15. International Remote Monitoring Project Embalse Nuclear Power Station, Argentina Embalse Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, Sigfried L.; Glidewell, Donnie D.; Bonino, Anibal; Bosler, Gene; Mercer, David; Maxey, Curt; Vones, Jaromir; Martelle, Guy; Busse, James; Kadner, Steve; White, Mike; Rovere, Luis

    1999-01-01

    The Autoridad Regulatoria Nuclear of Argentina (ARN), the International Atomic Energy Agency (IAEA), ABACC, the US Department of Energy, and the US Support Program POTAS, cooperated in the development of a Remote Monitoring System for nuclear nonproliferation efforts. This system was installed at the Embalse Nuclear Power Station last year to evaluate the feasibility of using radiation sensors in monitoring the transfer of spent fuel from the spent fuel pond to dry storage. The key element in this process is to maintain continuity of knowledge throughout the entire transfer process. This project evaluated the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguard efficiency. New technology has been developed to enhance the design of the system to include storage capability on board sensor platforms. This evaluation has led to design enhancements that will assure that no data loss will occur during loss of RF transmission of the sensors

  16. The Princess Elisabeth Station

    Science.gov (United States)

    Berte, Johan

    2012-01-01

    Aware of the increasing impact of human activities on the Earth system, Belgian Science Policy Office (Belspo) launched in 1997 a research programme in support of a sustainable development policy. This umbrella programme included the Belgian Scientific Programme on Antarctic Research. The International Polar Foundation, an organization led by the civil engineer and explorer Alain Hubert, was commissioned by the Belgian Federal government in 2004 to design, construct and operate a new Belgian Antarctic Research Station as an element under this umbrella programme. The station was to be designed as a central location for investigating the characteristic sequence of Antarctic geographical regions (polynia, coast, ice shelf, ice sheet, marginal mountain area and dry valleys, inland plateau) within a radius of 200 kilometers (approx.124 miles) of a selected site. The station was also to be designed as "state of the art" with respect to sustainable development, energy consumption, and waste disposal, with a minimum lifetime of 25 years. The goal of the project was to build a station and enable science. So first we needed some basic requirements, which I have listed here; plus we had to finance the station ourselves. Our most important requirement was that we decided to make it a zero emissions station. This was both a philosophical choice as we thought it more consistent with Antarctic Treaty obligations and it was also a logistical advantage. If you are using renewable energy sources, you do not have to bring in all the fuel.

  17. Reducing lighting electricity use in underground metro stations

    International Nuclear Information System (INIS)

    Casals, Miquel; Gangolells, Marta; Forcada, Núria; Macarulla, Marcel

    2016-01-01

    Highlights: • Lighting systems are big energy consumers in underground metro stations. • An adaptive lighting system strategy is developed for underground stations. • Dimming controls are based on station occupancy levels and maintenance cycles. • The k-means clustering technique is used to identify stations’ occupancy patterns. • Savings were found to amount to 255.47 MW h in 2 years for a case study metro network. - Abstract: Lighting systems are usually one of the largest electrical end-uses in underground metro stations. Taking into account that budget restrictions in publicly owned companies hinder energy efficiency retrofit projects that require high initial investments, affordable energy saving strategies are needed. This paper presents a low-cost approach for reducing lighting electricity use in underground stations, without affecting passengers’ comfort or the metro operator’s service. For this purpose, an adaptive lighting strategy of dimming the illuminance levels of artificial light sources has been developed. Dimming controls are based on the occupancy of the station, and the preventive maintenance and cleaning cycles of the luminaires. The stations’ monthly occupancy patterns are defined through the k-means clustering technique. To illustrate its effectiveness, the method was applied to 115 underground stations of the Barcelona metro network. The results revealed overall electricity savings of 255.47 MW h on a biannual basis, which represents 36.22% of the stations’ baseline lighting consumption. Individual energy savings were found to range from 25 to 87.5 MW h/year in the stations of the Barcelona metro network, depending on the number and profile of station users. The research findings will undoubtedly be useful for the future energy efficiency project plans of worldwide metro operators and managers of other underground spaces.

  18. UMTS Network Stations

    Science.gov (United States)

    Hernandez, C.

    2010-09-01

    The weakness of small island electrical grids implies a handicap for the electrical generation with renewable energy sources. With the intention of maximizing the installation of photovoltaic generators in the Canary Islands, arises the need to develop a solar forecasting system that allows knowing in advance the amount of PV generated electricity that will be going into the grid, from the installed PV power plants installed in the island. The forecasting tools need to get feedback from real weather data in "real time" from remote weather stations. Nevertheless, the transference of this data to the calculation computer servers is very complicated with the old point to point telecommunication systems that, neither allow the transfer of data from several remote weather stations simultaneously nor high frequency of sampling of weather parameters due to slowness of the connection. This one project has developed a telecommunications infrastructure that allows sensorizadas remote stations, to send data of its sensors, once every minute and simultaneously, to the calculation server running the solar forecasting numerical models. For it, the Canary Islands Institute of Technology has added a sophisticated communications network to its 30 weather stations measuring irradiation at strategic sites, areas with high penetration of photovoltaic generation or that have potential to host in the future photovoltaic power plants connected to the grid. In each one of the stations, irradiance and temperature measurement instruments have been installed, over inclined silicon cell, global radiation on horizontal surface and room temperature. Mobile telephone devices have been installed and programmed in each one of the weather stations, which allow the transfer of their data taking advantage of the UMTS service offered by the local telephone operator. Every minute the computer server running the numerical weather forecasting models receives data inputs from 120 instruments distributed

  19. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  20. Operation and management of United Central Piping LPG supply stations in Shenzhen

    Energy Technology Data Exchange (ETDEWEB)

    Lai Yankai

    1997-11-01

    Shenzhen has based its city gas development project on the eventual conversion to natural gas supply by way of central piping LPG supply stations. To fully exploit the potential gas supply capability of every central piping station and cut down the total running cost, we have been connecting the existing supply stations and their piping system into a network, which not only provided a more reliable gas supply performance, but can greatly simplify the evacuation of gas stations from the ever-expanding downtown areas to suburbs. Through this way, the periodic gas stock held by individual stations can be transferred to storage terminal or stations of enough holding capability; the supplying distance has been much lengthened and the gas volume held in the piping system increased; gas supply covered by small stations has been shifted to new and large stations. By linking these stations, we are able to provide pipeline LP gas supply for a large area, and in the same time lay down the pipeline infrastructure for the upcoming LNG supply so that an easy conversion to LNG supply can be secured as soon as the projected LNG terminal is put to service. (au)

  1. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  2. Accommodating life sciences on the Space Station

    Science.gov (United States)

    Arno, Roger D.

    1987-01-01

    The NASA Ames Research Center Biological Research Project (BRP) is responsible for identifying and accommodating high priority life science activities, utilizing nonhuman specimens, on the Space Station and is charged to bridge the gap between the science community and the Space Station Program. This paper discusses the approaches taken by the BRP in accomodating these research objectives to constraints imposed by the Space Station System, while maintaining a user-friendly environment. Consideration is given to the particular research disciplines which are given priority, the science objectives in each of these disciplines, the functions and activities required by these objectives, the research equipment, and the equipment suits. Life sciences programs planned by the Space Station participating partners (USA, Europe, Japan, and Canada) are compared.

  3. The local impacts of nuclear stations

    International Nuclear Information System (INIS)

    Gammon, K.M.

    1981-01-01

    The paper looks at the various non-radiological impacts of nuclear power stations on the environment which are grouped as ecological, amenity and socio-economic effects. The study and assessment of environment impacts are explained and comparisons made between those from nuclear and coal fired power stations. The prediction of future effects and judgement of their significance is difficult but is helped by the procedures evolved and by knowledge from the construction and operation of a large number of projects in physically different locations. Research is also needed into new issues and this must be recognised early. From experience of a number of nuclear stations it appears that the local impacts are acceptable provided care is taken. (author)

  4. From city’s station to station city. An integrative spatial approach to the (redevelopment of station areas

    Directory of Open Access Journals (Sweden)

    Ana Luísa Martins da Conceição

    2014-12-01

    Full Text Available Since its origin, the railway station has had a complicated relationship with the city, demanding periodical updates, particularly regarding spatial issues. With the aim of improving the liveability of station areas, current redevelopment projects are reconceptualising them as balanced transport ‘nodes’ and ‘places’ in the city. However, the proposed spatial solutions do not fully support the sought after economic, social and environmental performances. These intentions continue to be predominantly bounded with the (abstract planological level, not finding appropriate translation at the (concrete spatial design level. Further, the interdisciplinary nature of the highly complex planning and design processes of station areas, which should contribute to enhance the performance of their spaces, reinforces constraints and relegates architecture to a marginal role in this quest. It is thus necessary to understand how architecture can contribute to the improvement of the spatial performance of contemporary stations areas, supporting their current reconceptualization. To gain this understanding, the research explored the factors which influence the spatial definition and performance of European High Speed Train station areas, using “design research” and “research by design”. Via a theoretical integrative framework, synthesized from knowledge developed by architecture and other sciences, case studies of ‘through’ stations were analysed and compared. Six cases, encapsulating the most recurrent relative positions of the railway (infrastructure and the station building towards the(ir direct built environment, were chosen out of a large sample. For each category (cases with railway tracks at (a ground level, (b elevated level and (c underground level, two cases, featuring an adapted station building and a newly built one, were studied. Their physical and functional characteristics were mapped at several scales and moments (in history, as

  5. Degradation of TBC Systems in Environments Relevant to Advanced Gas Turbines for IGCC Systems

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, Brian [Univ. of Pittsburgh, PA (United States)

    2014-09-30

    Air plasma sprayed (APS) thermal barrier coatings (TBCs) are used to provide thermal insulation for the hottest components in gas turbines. Zirconia stabilized with 7wt% yttria (7YSZ) is the most common ceramic top coat used for turbine blades. The 7YSZ coating can be degraded from the buildup of fly-ash deposits created in the power-generation process. Fly ash from an integrated gasification combined cycle (IGCC) system can result from coal-based syngas. TBCs are also exposed to harsh gas environments containing CO2, SO2, and steam. Degradation from the combined effects of fly ash and harsh gas atmospheres has the potential to severely limit TBC lifetimes. The main objective of this study was to use lab-scale testing to systematically elucidate the interplay between prototypical deposit chemistries (i.e., ash and its constituents, K2SO4, and FeS) and environmental oxidants (i.e., O2, H2O and CO2) on the degradation behavior of advanced TBC systems. Several mechanisms of early TBC failure were identified, as were the specific fly-ash constituents responsible for degradation. The reactivity of MCrAlY bondcoats used in TBC systems was also investigated. The specific roles of oxide and sulfate components were assessed, together with the complex interplay between gas composition, deposit chemistry and alloy reactivity. Bondcoat composition design strategies to mitigate corrosion were established, particularly with regard to controlling phase constitution and the amount of reactive elements the bondcoat contains in order to achieve optimal corrosion resistance.

  6. Upgrade and extension of the climate station at DTU Byg

    DEFF Research Database (Denmark)

    Andersen, Elsa; Dragsted, Janne; Kristensen, Troels V.

    In the period 2013-2014 the project “Upgrade and Extension of the Climate Station at DTU Byg” is carried out at DTU Byg. The aim of the project is to renew the hardware and the software for data acquisition and monitoring, exchange cables and cable connections in order to avoid interference...... of electrical noise from the surroundings and exchange worn out equipment. Further, the aim is to make measured data from the climate station easily available for the users....

  7. TECO Energy, Inc. 1992 annual report

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Achievements of TECO Energy, Inc., during 1992 are summarized in the annual report which includes financial data for the year up to 31 December 1992. Work continues on Tampa Electric's Polk Power Station, utilizing IGCC technology planned to come on line in 1995/6. Many energy conservation projects have been completed such as one to promote energy efficient cordless electric lawnmowers. TECO Transport and Trade continued to expand its transloading and shipping business. TECO Coal completed its acquisition of additional low-sulfur coal reserves in eastern Kentucky and Tennessee. Although Tampa Electric is its principal customer, in 1992 shipments of coal were made to other customers. Earnings from TECO Coalbed Methane more than doubled in 1992, a major factor being the federal tax credit available on production. In 1992, the company acquired most of the interests of its operator, Taurus Exploration. In 1992 on additional 47 wells were drilled. TECO Power Services completed construction of a 295 MW combined-cycle power plants known as the Hardee Power Station in central Florida

  8. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  9. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  10. Adaptive downtilt for cellular base stations

    NARCIS (Netherlands)

    Mestrom, R.M.C.; Coenen, T.J.; Smolders, A.B.

    2012-01-01

    Efficiency, reconfigurability, and power consumption are paramount for future communication systems in applications such as cellular handsets, base stations and home networking systems. We present our work in the European PANAMA project which addresses the associated challenges. Our work focuses on

  11. Point Lepreau generating station

    International Nuclear Information System (INIS)

    Ganong, G.H.D.; Strang, A.E.; Gunter, G.E.; Thompson, T.S.

    Point Lepreau-1 reactor is a 600 MWe generating station expected to be in service by October 1979. New Brunswick is suffering a 'catch up' phenomenon in load growth and needs to decrease dependence on foreign oil. The site is on salt water and extensive study has gone into corrosion control. Project management, financing and scheduling have unique aspects. (E.C.B.)

  12. Gravitational biology on the space station

    Science.gov (United States)

    Keefe, J. R.; Krikorian, A. D.

    1983-01-01

    The current status of gravitational biology is summarized, future areas of required basic research in earth-based and spaceflight projects are presented, and potential applications of gravitational biology on a space station are demonstrated. Topics covered include vertebrate reproduction, prenatal/postnatal development, a review of plant space experiments, the facilities needed for growing plants, gravimorphogenesis, thigmomorphogenesis, centrifuges, maintaining a vivarium, tissue culture, and artificial human organ generation. It is proposed that space stations carrying out these types of long-term research be called the National Space Research Facility.

  13. Present status and future of the sophisticated work station

    Science.gov (United States)

    Ishida, Haruhisa

    The excellency of the work station is explained, by comparing the functions of software and hardware of work station with those of personal computer. As one of the examples utilizing the functions of work station, desk top publishing is explained. By describing the competition between the Group of ATT · Sun Microsystems which intends to have the leadership by integrating Berkeley version which is most popular at this moment and System V version, and the group led by IBM, future of UNIX as OS of work station is predicted. Development of RISC processor, TRON Plan and Sigma Projects by MITI are also mentioned as its background.

  14. Station planning and design incorporating modern power system practice

    CERN Document Server

    Martin, PC

    1991-01-01

    The planning and design of new power stations can involve complex interaction between the many engineering disciplines involved as well as environmental, planning, economical, political and social pressures. This volume aims to provide a logical review of the procedures involved in power station development. The engineering aspects are outlined in detail, with examples, showing the basis of the relationships involved together with ""non-engineering"" factors so that the engineer can draw on the information provided for specific projects. The civil engineering and building of power stations are

  15. Neumayer III and Kohnen Station in Antarctica operated by the Alfred Wegener Institute

    Directory of Open Access Journals (Sweden)

    Christine Wesche

    2016-08-01

    Full Text Available The Alfred Wegener Institute operates two stations in Dronning Maud Land, Antarctica. The German overwintering station Neumayer III is located on the Ekström Ice Shelf at 70°40’S and 08°16’W and is the logistics base for three long-term observatories (meteorology, air chemistry and geophysics and nearby research activities. Due to the vicinity to the coast (ca. 20 km from the ice shelf edge, the Neumayer III Station is the junction for many German Antarctic expeditions, especially as the starting point for the supply traverse for the second German station Kohnen. The summer station Kohnen is located about 600 km from the coast and 750 km from Neumayer III Station on the Antarctic plateau at 75°S and 00°04’E. It was erected as the base for the deep-drilling ice core project, which took place between 2001 and 2006. Since then Kohnen Station is used as a logistics base for different research projects.

  16. Impact studies and nuclear power stations

    International Nuclear Information System (INIS)

    Chambolle, Thierry

    1981-01-01

    Impact studies form an essential part of environmental protection. The impact study discipline has enabled the EDF to have a better understanding of the effects of nuclear power stations on the environment and to remedy them at the project design stage [fr

  17. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

    2008-02-01

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  18. Development of ITM oxygen technology for integration in IGCC and other advanced power generation

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, Phillip A. [Air Products And Chemicals, Inc., Allentown, PA (United States)

    2015-03-31

    -of-the-art cryogenic air separation technology in energy-intensive applications such as IGCC with and without carbon capture.

  19. Cloud Compute for Global Climate Station Summaries

    Science.gov (United States)

    Baldwin, R.; May, B.; Cogbill, P.

    2017-12-01

    Global Climate Station Summaries are simple indicators of observational normals which include climatic data summarizations and frequency distributions. These typically are statistical analyses of station data over 5-, 10-, 20-, 30-year or longer time periods. The summaries are computed from the global surface hourly dataset. This dataset totaling over 500 gigabytes is comprised of 40 different types of weather observations with 20,000 stations worldwide. NCEI and the U.S. Navy developed these value added products in the form of hourly summaries from many of these observations. Enabling this compute functionality in the cloud is the focus of the project. An overview of approach and challenges associated with application transition to the cloud will be presented.

  20. Integrated gasification combined cycle and the capture of CO{sub 2}: a solution for the mitigation of the CO{sub 2} emissions of coal fired power plants at large scale in the short term?; O ciclo combinado com gaseificacao integrada e a captura de CO{sub 2}: uma solucao para mitigar as emissoes de CO{sub 2} em termeletricas a carvao em larga escala no curto prazo?

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, Bettina Susanne

    2010-03-15

    The power sector of many big economies still relies heavily on coal fired plants and emits huge amounts of carbon dioxide (CO{sub 2}). The Integrated Gasification Combined Cycle (IGCC) is an innovative technology which holds advantages over current conventional coal technologies, including higher efficiency, pathway to carbon capture and storage (CCS) and higher product and fuel flexibility. The most critical obstacles for commercialization of IGCC technology are higher costs, lower reliability, and little operating experiences. The present work aims to analyze the maturity and the costs of the IGCC technology, with and without CCS, in order to evaluate its potential to be introduced in the generation fleet at big scale in the short term and, hence, its potential to guarantee the possibility to use coal in the power sector without compromising the effort to reduce CO{sub 2} emissions. The focus of the analysis of the technical viability concentrates strongly on the gasification process, since it the most critical process for the operation of the plant. The cost analysis contains three steps: a revision of cost estimates in scientific literature, a revision of reported cost for actually planned projects and a cost simulation that aims to analyze the influences of assumptions regarding the additional technology risk of IGCC plants. (author)

  1. The SNS target station preliminary Title I shielding analyses

    International Nuclear Information System (INIS)

    Johnson, J.O.; Santoro, R.T.; Lillie, R.A.; Barnes, J.M.; McNeilly, G.S.

    2000-01-01

    The Department of Energy (DOE) has given the Spallation Neutron Source (SNS) project approval to begin Title I design of the proposed facility to be built at Oak Ridge National Laboratory (ORNL). During the conceptual design phase of the SNS project, the target station bulk-biological shield was characterized and the activation of the major targets station components was calculated. Shielding requirements were assessed with respect to weight, space, and dose-rate constraints for operating, shut-down, and accident conditions utilizing the SNS shield design criteria, DOE Order 5480.25, and requirements specified in 10 CFR 835. Since completion of the conceptual design phase, there have been major design changes to the target station as a result of the initial shielding and activation analyses, modifications brought about due to engineering concerns, and feedback from numerous external review committees. These design changes have impacted the results of the conceptual design analyses, and consequently, have required a re-investigation of the new design. Furthermore, the conceptual design shielding analysis did not address many of the details associated with the engineering design of the target station. In this paper, some of the proposed SNS target station preliminary Title I shielding design analyses will be presented. The SNS facility (with emphasis on the target station), shielding design requirements, calculational strategy, and source terms used in the analyses will be described. Preliminary results and conclusions, along with recommendations for additional analyses, will also be presented. (author)

  2. Solar electricity power station building. A preliminary project investigation for “PIRIN TEX LTD.” – Gotze Delchgev using

    International Nuclear Information System (INIS)

    Kolev, Boyko; Todorieva, Vanja

    2009-01-01

    The total solar energy absorbed by Earth's atmosphere, oceans and land masses is approximately 3,850,000 exa joules (EJ=1018 J) per year. In 2005, this was more energy in one hour than the world used in one year. Photosynthesis captures approximately 3,000 EJ per year in biomass. The amount of solar energy reaching the surface of the planet is so vast that in one year it is about twice as much as will ever be obtained from all of the Earth's non-renewable resources of coal, oil, natural gas, and mined uranium combined. Natural gas crisis such as this from January 2009 in Bulgaria turn into the best investments the development of technology for renewable energy sources using especially solar energy using for electricity production and water heating. The aims of this article are: To develop a preliminary project for solar electricity power station build-ing; To estimate the profits of solar energy used for electricity production and water heating. Keywords: renewable energy sources, solar energy accumulation, solar electricity power station, natural gas crisis

  3. Shippingport Atomic Power Station decommissioning program and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F P; Skavdahl, R E

    1985-01-01

    The Shippingport Station decommissioning project is the first decommissioning of a large scale nuclear power plant, and also the first nuclear power plant to be decommissioned which has continued the power operation as long as 25 years. The nuclear facilities which have been decommissioned so far have operated for shorter period and were small as compared with commercial power reactors, but the experience gained by those decommissionings as well as that gained by nuclear plant maintenance and modification has helped to establish the technology and cost basis for Shippingport and future decommissioning projects. In this paper, the current status of the preparation being made by the General Electric Co., its subcontractor and the US Department of Energy for starting the decommissioning phase of the Shippingport Atomic Power Station is described. Also remote metal cutting, decontamination, concrete removal, the volume reduction of liquids and solids and robotics which will be applied to the project are discussed. The Shippingport Station is a 72 MWe PWR plant having started operation in 1957, and permanently shut down in 1982, after having generated over 7.4 billion kWh of electricity.

  4. Hyapproval : final handbook for approval of hydrogen refuelling stations

    NARCIS (Netherlands)

    Wurster, R.; Landinger, H.; Machens, C.; Allidières, L.; Molag, M.; Barron, J.; Reijalt, M.; Hill, H.J.

    2006-01-01

    HyApproval is an EC co-financed Specific Targeted Research Project (STREP) to develop a Handbook facilitating the approval of Hydrogen Refuelling Stations (HRS). The project, started in October 2005, will be performed over 24 months by a balanced partnership including 25 partners from industry, SMEs

  5. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  6. Heat Integration of the Water-Gas Shift Reaction System for Carbon Sequestration Ready IGCC Process with Chemical Looping

    Energy Technology Data Exchange (ETDEWEB)

    Juan M. Salazara; Stephen E. Zitney; Urmila M. Diwekara

    2010-01-01

    Integrated gasification combined cycle (IGCC) technology has been considered as an important alternative for efficient power systems that can reduce fuel consumption and CO2 emissions. One of the technological schemes combines water-gas shift reaction and chemical-looping combustion as post gasification techniques in order to produce sequestration-ready CO2 and potentially reduce the size of the gas turbine. However, these schemes have not been energetically integrated and process synthesis techniques can be applied to obtain an optimal flowsheet. This work studies the heat exchange network synthesis (HENS) for the water-gas shift reaction train employing a set of alternative designs provided by Aspen energy analyzer (AEA) and combined in a process superstructure that was simulated in Aspen Plus (AP). This approach allows a rigorous evaluation of the alternative designs and their combinations avoiding all the AEA simplifications (linearized models of heat exchangers). A CAPE-OPEN compliant capability which makes use of a MINLP algorithm for sequential modular simulators was employed to obtain a heat exchange network that provided a cost of energy that was 27% lower than the base case. Highly influential parameters for the pos gasification technologies (i.e. CO/steam ratio, gasifier temperature and pressure) were calculated to obtain the minimum cost of energy while chemical looping parameters (oxidation and reduction temperature) were ensured to be satisfied.

  7. Modelling and dynamics of an air separation rectification column as part of an IGCC power plant

    Energy Technology Data Exchange (ETDEWEB)

    Seliger, B.; Hanke-Rauschenbach, R.; Hannemann, F.; Sundmacher, K. [Otto Von Guericke University, Magdeburg (Germany)

    2006-04-15

    An Integrated Gasification Combined Cycle plant (IGCC) opens the well-proven and highly efficient combined cycle process to fossil fuels, like coal or heavy refinery residues. Such a plant thereby possesses a novel linkage of typical energy engineering related units, e.g. a gas turbine and typical process engineering parts, which in the present case is an air separation plant. Different responses from the connected components can cause undesired mass flow fluctuations within the system especially during changing load demands. The cryogenic rectification column, as the core of the air separation plant, strongly affects the system's transient behaviour. The upper part of such a heat-integrated double column, a packed column with structured packing, has therefore been more closely investigated in the present paper. For this purpose, a dynamic model of such a column has been developed which is also able to describe the pressure dynamics supposedly responsible for these mass flow fluctuations. The transient behaviour of the uncontrolled column is analysed and discussed with special regard to pressure dynamics. The column pressure responds to disturbances on two different time scales. The short-term response, which is in the range of 100-200 s, is governed by the transient behaviour of the fluid dynamics and is discussed in detail. The long-term response is dominated by the nonlinear dynamics of the concentration profiles. The time constant of this response depends strongly on the direction and intensity of the disturbance and takes from 10,000 up to several 100,000 s.

  8. Principle simulator for a PWR nuclear power station

    International Nuclear Information System (INIS)

    Wahlstroem, B.

    1975-05-01

    A report is given on a simulator developed for the training of operational and planning staff for the Lovisa nuclear power station in Finland. All main components of the power station are illustrated and trainees can operate the simulator in the power range 3-100 %. The model was originally developed for planning the control system of Lovisa I, for which reason the simulator project could be carried out on a relatively limited budget. (author)

  9. A Management Tool for Improvement (Improving) IMS Stations Performance

    International Nuclear Information System (INIS)

    Mohammad, D.; Pantin, A.; Quintana, E.

    2011-01-01

    IMS-Maintenance is a software under development by the personnel of ARN-CTBT office, intended for the technical management of IMS stations under ARN's responsibility. This software integrates the whole control of the equipment in an IMS station, including the management of consumables used in daily or periodic operation. It permits an easy retrieval (access) of the technical features, suppliers, etc. of each item of the equipment, as well as its maintenance history and scheduled task. Although this project is still in a starting phase, a preliminary version of this software is being used in radionuclide station RN01 (Buenos Aires), having already demonstrated its usefulness and potential for the improvement of IMS station management. (authors)

  10. Nova isolates noise to quieten stations

    International Nuclear Information System (INIS)

    Milner, G.J.; Frank, L.D.

    1993-01-01

    This paper reviews a technique developed by Nova Corp., to help isolate and measure the acoustic power of individual components in a pipeline compressor and pumping station. The procedure calculates the sound pressure levels of each piece of equipment independently. Based on these measurements, a prediction can be made of the effect of various types of noise treatment techniques on the overall sound levels currently generated or proposed in a future project. This paper describes the equipment to measure the sound levels, techniques for actually measuring the compressor station or equipment area, and techniques used to generate a remediation plan

  11. Operational radio interferometry observation network (ORION) mobile VLBI station. [for NASA Crustal Dynamics Project

    Science.gov (United States)

    Renzetti, N. A.; Vegos, C. J.; Parks, G. S.; Sniffin, R. W.; Gannon, D. L.; Nishimura, H. G.; Clements, P. A.; Mckinney, R. P.; Menninger, F. J.; Vandenberg, N. R.

    1983-01-01

    The design and current status of the ORION mobile VLBI station is described. The station consists of a five-meter antenna, a receiving and recording system installed in a mobile antenna transporter, and an electronics transporter. The station is designed for field operation by a two-person crew at the rate of two sites per week. The various subsystems are described in detail, including the antenna, housing facilities for electronics and crew, microwave equipment, receiver, data acquisition subsystem, frequency and timing subsystem, phase calibration, monitoring and control, water vapor radiometer, and communications.

  12. Pilot Water Quality Monitoring Station in Dublin Bay : North Bank Station (NBMS), MATSIS Project Part I

    OpenAIRE

    O'Donnell, Garvan; Joyce, Eileen; Silke, Joe; O'Boyle, Shane; McGovern, Evin

    2008-01-01

    This report describes the pilot development of an autonomous monitoring station in Dublin Bay and validation of the system. It presents results from initial deployments. Sensors were deployed for testing, including an optical sensor for measuring nitrate and sensors for measurement of salinity, temperature, fluorescence and dissolved oxygen. Automated water samplers enabled periodic, remote triggered and event triggered sampling for nutrient and phytoplankton samples.

  13. EUPOS - Satellite multifunctional system of reference stations in Central and Eastern Europe

    Science.gov (United States)

    Sledzinski, J.

    2003-04-01

    The European project EUPOS (European Position Determination System) of establishment of a system of multifunctional satellite reference stations in Central and Eastern Europe is described in the paper. Fifteen countries intend to participate in the project: Bulgaria, Croatia, Czech Republic, Estonia, Germany, Hungary, Latvia, Lithuania, Macedonia, Poland, Romania, Russia, Serbia, Slovak Republic and Slovenia. One common project will be prepared for all countries, however it will include the existing or developed infrastructure in particular countries. The experiences of establishing and operating of the German network SAPOS as well as experiences gained by other countries will be used. The European network of stations will be compatible with the system SAPOS and future European system Galileo. The network of reference stations will provide signal for both positioning of the geodetic control points and for land, air and marine navigation. Several levels of positioning accuracy will be delivered.

  14. Hydrogen Fueling Station Using Thermal Compression: a techno-economic analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kriha, Kenneth [Gas Technology Inst., Des Plaines, IL (United States); Petitpas, Guillaume [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Melchionda, Michael [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Soto, Herie [Shell, Houston TX (United States); Feng, Zhili [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wang, Yanli [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-08-11

    The goal of this project was to demonstrate the technical and economic feasibility of using thermal compression to create the hydrogen pressure necessary to operate vehicle hydrogen fueling stations. The concept of utilizing the exergy within liquid hydrogen to build pressure rather than mechanical components such as compressors or cryogenic liquid pumps has several advantages. In theory, the compressor-less hydrogen station will have lower operating and maintenance costs because the compressors found in conventional stations require large amounts of electricity to run and are prone to mechanical breakdowns. The thermal compression station also utilizes some of the energy used to liquefy the hydrogen as work to build pressure, this is energy that in conventional stations is lost as heat to the environment.

  15. Shippingport: A relevant decommissioning project

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1988-01-01

    Because of Shippingport's low electrical power rating (72 MWe), there has been some misunderstanding on the relevancy of the Shippingport Station Decommissioning Project (SSDP) to a modern 1175 MWe commercial pressurized water reactor (PWR) power station. This paper provides a comparison of the major components of the reactor plant of the 72 MWe Shippingport Atomic Power Station and an 1175 MWe nuclear plant and the relevancy of the Shippingport decommissioning as a demonstration project for the nuclear industry. For the purpose of this comparison, Portland General Electric Company's 1175 MWe Trojan Nuclear Plant at Rainier, Oregon, has been used as the reference nuclear power plant. 2 refs., 2 figs., 1 tab

  16. Electricite de France: Lifetime Project

    International Nuclear Information System (INIS)

    Combes, Jean-Pierre

    1991-01-01

    Electricite de France produces almost 80% of its electricity by means of standardized PWR nuclear power stations. Starting in 1986, therefore, a project known as the 'Lifetime Project' was developed, whose aim was initially to ensure that the lifetime defined at design stage (40 years in general) could be attained without major difficulty (follow up of the aging process). It then became apparent that it would be useful to know just how far it would be technically and economically possible to go. As a result, the project is now working towards increasing the lifetime of power stations. (author)

  17. International Space Station exhibit

    Science.gov (United States)

    2000-01-01

    The International Space Station (ISS) exhibit in StenniSphere at John C. Stennis Space Center in Hancock County, Miss., gives visitors an up-close look at the largest international peacetime project in history. Step inside a module of the ISS and glimpse how astronauts will live and work in space. Currently, 16 countries contribute resources and hardware to the ISS. When complete, the orbiting research facility will be larger than a football field.

  18. CO2 Capture and Storage in Coal Gasification Projects

    Science.gov (United States)

    Rao, Anand B.; Phadke, Pranav C.

    2017-07-01

    concerns about climate change problem. Carbon Capture and Storage (CCS) is being considered as a promising carbon mitigation technology, especially for large point sources such as coal power plants. Gasification of coal helps in better utilization of this resource offering multiple advantages such as pollution prevention, product flexibility (syngas and hydrogen) and higher efficiency (combined cycle). It also enables the capture of CO2 prior to the combustion, from the fuel gas mixture, at relatively lesser cost as compared to the post-combustion CO2 capture. CCS in gasification projects is considered as a promising technology for cost-effective carbon mitigation. Although many projects (power and non-power) have been announced internationally, very few large-scale projects have actually come up. This paper looks at the various aspects of CCS applications in gasification projects, including the technical feasibility and economic viability and discusses an Indian perspective. Impacts of including CCS in gasification projects (e.g. IGCC plants) have been assessed using a simulation tool. Integrated Environmental Control Model (IECM) - a modelling framework to simulate power plants - has been used to estimate the implications of adding CCS units in IGCC plants, on their performance and costs.

  19. Task analysis and structure scheme for center manager station in large container inspection system

    International Nuclear Information System (INIS)

    Li Zheng; Gao Wenhuan; Wang Jingjin; Kang Kejun; Chen Zhiqiang

    1997-01-01

    LCIS works as follows: the accelerator generates beam pulses which are formed into fan shape; the scanning system drags a lorry with a container passing through the beam in constant speed; the detector array detects the beam penetrating the lorry; the projection data acquisition system reads the projections and completes an inspection image of the lorry. All these works are controlled and synchronized by the center manage station. The author will describe the process of the projection data acquisition in scanning mode and the methods of real-time projection data processing. the task analysis and the structure scheme of center manager station is presented

  20. Quality improvement process pilot project at Gallagher station

    International Nuclear Information System (INIS)

    Vondielingen, D.E.

    1992-01-01

    A Quality Improvement Process was piloted at Gallagher station in 1990 to address issues of two Electric System Strategy Group (ESSG) goals. Darrell McElravy headed a group to address quality, productivity and prove and Judy Rushing headed a group to address innovation and recognition. These groups combined when a process was identified that could address both issues. The process was designed for PSI Energy by Business Incentives and is an incentive-based quality improvement process that seeks employee involvement to identify inhibitors t performance and to establish a method to eliminate the problem. Performance goals were also established that help focus efforts to improve performance and reward employees for their efforts

  1. Reload Startup Physics Tests for Tianwan Nuclear Power station

    International Nuclear Information System (INIS)

    Yang Xiaoqiang; Li Wenshuang; Li Youyi; Yao Jinguo; Li Zaipeng Jiangsu

    2010-01-01

    This paper briefly describes the test purposes, test items, test schedules and test equipment's for reload startup physics test's on Unit 1 and 2 of Tianwan Nuclear Power station. Then, an overview of the previous thrice tests and evaluations on the tests results are presented. In the end, the paper shows the development and work direction of optimization project for reload startup physics tests on Unit 1 and 2 of Tianwan Nuclear Power station. (Authors)

  2. Baseload coal investment decisions under uncertain carbon legislation.

    Science.gov (United States)

    Bergerson, Joule A; Lave, Lester B

    2007-05-15

    More than 50% of electricity in the U.S. is generated by coal. The U.S. has large coal resources, the cheapest fuel in most areas. Coal fired power plants are likely to continue to provide much of U.S. electricity. However, the type of power plant that should be built is unclear. Technology can reduce pollutant discharges and capture and sequester the CO2 from coal-fired generation. The U.S. Energy Policy Act of 2005 provides incentives for large scale commercial deployment of Integrated Coal Gasification Combined Cycle (IGCC) systems (e.g., loan guarantees and project tax credits). This analysis examines whether a new coal plant should be Pulverized Coal (PC) or IGCC. Do stricter emissions standards (PM, SO2, NOx, Hg) justify the higher costs of IGCC over PC? How does potential future carbon legislation affect the decision to add carbon capture and storage (CCS) technology? Finally, can the impact of uncertain carbon legislation be minimized? We find that SO2, NOx, PM, and Hg emission standards would have to be far more stringent than twice current standards to justify the increased costs of the IGCC system. A C02 tax less than $29/ton would lead companies to continuing to choose PC, paying the tax for emitted CO2. The earlier a decision-maker believes the carbon tax will be imposed and the higher the tax, the more likely companies will choose IGCC w/CCS. Having government announce the date and level of a carbon tax would promote more sensible decisions, but government would have to use a tax or subsidy to induce companies to choose the technology that is best for society.

  3. Integrated gasification gas combined cycle plant with membrane reactors: Technological and economical analysis

    International Nuclear Information System (INIS)

    Amelio, Mario; Morrone, Pietropaolo; Gallucci, Fausto; Basile, Angelo

    2007-01-01

    In the present work, the capture and storage of carbon dioxide from the fossil fuel power plant have been considered. The main objective was to analyze the thermodynamic performances and the technological aspects of two integrated gasification gas combined cycle plants (IGCC), as well as to give a forecast of the investment costs for the plants and the resulting energy consumptions. The first plant considered is an IGCC* plant (integrated gasification gas combined cycle plant with traditional shift reactors) characterized by the traditional water gas shift reactors and a CO 2 physical adsorption system followed by the power section. The second one is an IGCC M plant (integrated gasification gas combined cycle plant with membrane reactor) where the coal thermal input is the same as the first one, but the traditional shift reactors and the physical adsorption unit are replaced by catalytic palladium membrane reactors (CMR). In the present work, a mono-dimensional computational model of the membrane reactor was proposed to simulate and evaluate the capability of the IGCC M plant to capture carbon dioxide. The energetic performances, efficiency and net power of the IGCC* and IGCC M plants were, thus, compared, assuming as standard a traditional IGCC plant without carbon dioxide capture. The economical aspects of the three plants were compared through an economical analysis. Since the IGCC* and IGCC M plants have additional costs related to the capture and disposal of the carbon dioxide, a Carbon Tax (adopted in some countries like Sweden) proportional to the number of kilograms of carbon dioxide released in the environment was assumed. According to the economical analysis, the IGCC M plant proved to be more convenient than the IGCC* one

  4. Environmental analysis report : Becancour cogeneration power station by TransCanada Energy Ltd

    International Nuclear Information System (INIS)

    Gagnon, D.; Theberge, M.C.

    2004-01-01

    This report presents an environmental analysis of TransCanada Energy's proposed project to construct the Becancour cogeneration power station fuelled by natural gas. The realization of this project requires the delivery of a certificate of authorization by the Quebec government. One requirement to obtain this certificate is the completion of an environmental impact study. This report first presents the purpose and general description of the project. It includes an environmental analysis of the issues and impacts associated with the project including environmental problems associated with greenhouse gas emissions. The conclusion and the recommendations for the conditions of the project are presented thereafter. The report concludes that the environmental impacts resulting from the realization of the power station are very few and include atmospheric emissions, vapors, noise, rejections liquid and technological risks. Suitable abatement measures and selected technology make it possible to control these impacts. 8 refs., 2 figs., 3 appendices

  5. The Ongoing Addition of Infrasound Sensors and the Flexette Wind-Noise Reducing System to Global Seismic Network Stations Operated by Project IDA

    Science.gov (United States)

    Ebeling, C. W.; Coon, C.

    2017-12-01

    Infrasound sensors are now being installed at Global Seismic Network (GSN) stations meeting certain infrastructure criteria. Manufactured by Hyperion Technology Group, Inc., these instruments (model IFS-3312) have a nominal sensitivity of 140 mV/Pa (at 1 Hz), a full-scale range of ±100 Pa, and a dynamic range of 120 dB. Low power consumption (750 mW at 12 VDC) and small size (153 mm x 178 mm) ease incorporation into the mix of existing GSN instrumentation. The accompanying flexible rosette ("Flexette") acoustic wind-noise reducing system, designed by Project IDA (International Deployment of Accelerometers-IDA), optimally includes 24 inlets, 4 secondary manifolds, and a single primary manifold. Each secondary manifold is connected to 6 inlets and to the primary manifold by 10-ft air hoses, thus eliminating stresses and the greater potential for leaks associated with the use of pipe. While the main design goal was to maximize the reduction of acoustic wind-noise over the widest range of wind speeds possible, consideration of additional criteria resulted in a Flexette base design easily tailored to meet individual station constraints and restrictions, made up of inexpensive (total cost Marshall Islands), in August 2017. During the next 6 months infrasound capability will be extended to IDA GSN stations BORG (Borganes, Iceland), EFI (Mount Kent, East Falkland Islands), and SACV (Santiago Island, Cape Verde).As with other data from GSN stations, real-time infrasound data are freely available from the Incorporated Research Institutions for Seismology-Data Management Center (IRIS-DMC).

  6. Environmental radioactivity in the antarctic station

    International Nuclear Information System (INIS)

    Gonzalez, S.; Osores, J.; Martinez, J.; Lopez, E.; Jara, R.

    1998-01-01

    Study about environmental radioactivity in the Peruvian antarctic station Machu Pichu they were carried out during the last three periods to the southern summer. The objective of the project it is to evaluate environmental component in order to elaborate a study it base on the levels background radioactivity and artificial in the antarctic region

  7. Radiation safety assessment of mobile telephone base stations

    International Nuclear Information System (INIS)

    Mohd Yusof Mohd Ali; Mohd Anuar Majid; Mohd Amirul Nizam

    2002-01-01

    Mobile telephone is fast getting popular among users and in fact it has become one of the fastest selling electronic products in the world. More base stations are expected to be built to meet such high demands and this has caused great concerned among members of the public, especially those living close to the stations, about the potential harmful health effects of radiofrequency (RF) radiation produced by such facilities. A project was initiated by MINT in early 2000 with aims to assess the radiation levels present in the areas around the base stations and to establish baseline data on the pattern and trend of the radiation emission from each different set up of the facilities. This paper highlights some basics facts about mobile telephones and preliminary findings of the project. The assessment has been carried out at 16 base station sites and the results indicate that the radiation levels present around these sites are very low. Their broadband readings vary between below the detection limit of 0.3μWatts/cm 2 to 11 μWatts/cm 2 and they are comparable to normal background radiation present in places away from any base stations. The highest level observed was 1.5% of the exposure limit recommended for members of the public. However, locations at close distance in front of the the antenna can be very serious in term of radiation exposure since the radiation level here can easily exceed the permissible exposure limit for public. Safety precaution needs to be taken when entering these areas and they should be out of bound for members of the public. (Author)

  8. Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

    Science.gov (United States)

    Bonine, Lauren

    2015-01-01

    The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

  9. Scoping Studies to Evaluate the Benefits of an Advanced Dry Feed System on the Use of Low-Rank Coal

    Energy Technology Data Exchange (ETDEWEB)

    Rader, Jeff; Aguilar, Kelly; Aldred, Derek; Chadwick, Ronald; Conchieri, John; Dara, Satyadileep; Henson, Victor; Leininger, Tom; Liber, Pawel; Liber, Pawel; Lopez-Nakazono, Benito; Pan, Edward; Ramirez, Jennifer; Stevenson, John; Venkatraman, Vignesh

    2012-03-30

    The purpose of this project was to evaluate the ability of advanced low rank coal gasification technology to cause a significant reduction in the COE for IGCC power plants with 90% carbon capture and sequestration compared with the COE for similarly configured IGCC plants using conventional low rank coal gasification technology. GE’s advanced low rank coal gasification technology uses the Posimetric Feed System, a new dry coal feed system based on GE’s proprietary Posimetric Feeder. In order to demonstrate the performance and economic benefits of the Posimetric Feeder in lowering the cost of low rank coal-fired IGCC power with carbon capture, two case studies were completed. In the Base Case, the gasifier was fed a dilute slurry of Montana Rosebud PRB coal using GE’s conventional slurry feed system. In the Advanced Technology Case, the slurry feed system was replaced with the Posimetric Feed system. The process configurations of both cases were kept the same, to the extent possible, in order to highlight the benefit of substituting the Posimetric Feed System for the slurry feed system.

  10. Rocky Mountain Research Station 2008-2012 National Fire Plan Investments

    Science.gov (United States)

    Erika Gallegos

    2013-01-01

    This report highlights selected accomplishments by the USDA Forest Service Rocky Mountain Research Station's Wildland Fire and Fuels Research & Development projects in support of the National Fire Plan from 2008 through 2012. These projects are examples of the broad range of knowledge and tools developed by National Fire Plan funding beginning in 2008.

  11. Buried waste integrated demonstration human engineered control station. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This document describes the Human Engineered Control Station (HECS) project activities including the conceptual designs. The purpose of the HECS is to enhance the effectiveness and efficiency of remote retrieval by providing an integrated remote control station. The HECS integrates human capabilities, limitations, and expectations into the design to reduce the potential for human error, provides an easy system to learn and operate, provides an increased productivity, and reduces the ultimate investment in training. The overall HECS consists of the technology interface stations, supporting engineering aids, platform (trailer), communications network (broadband system), and collision avoidance system.

  12. Buried waste integrated demonstration human engineered control station. Final report

    International Nuclear Information System (INIS)

    1994-09-01

    This document describes the Human Engineered Control Station (HECS) project activities including the conceptual designs. The purpose of the HECS is to enhance the effectiveness and efficiency of remote retrieval by providing an integrated remote control station. The HECS integrates human capabilities, limitations, and expectations into the design to reduce the potential for human error, provides an easy system to learn and operate, provides an increased productivity, and reduces the ultimate investment in training. The overall HECS consists of the technology interface stations, supporting engineering aids, platform (trailer), communications network (broadband system), and collision avoidance system

  13. The local economic and social effects of power station siting: anticipated, demonstrated and perceived

    International Nuclear Information System (INIS)

    Glasson, J.

    1980-01-01

    The paper discusses the economic and social effects of power station siting at a local level using material based on the interim research findings from a project commissioned by the Central Electricity Generating Board. The cases for and against power station development are outlined and a review of the actual economic and social effects is presented, drawn from a study of a conventional power station at Drax and a nuclear power station at Sizewell. (U.K.)

  14. District Heating Demonstration project. Bydgoszcz, Poland, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The project was finished in January 1999. The present final report outlines the activities of the pilot project. The activities of the project were: Development of a general model or a design strategy for the modernisation of group substations; Training of selected staff in updated design and latest technologies; Comparing experiences from the reconstructed heat exchanger station with alternative solutions; Investigation of potential sources of financing for the modernisation of the district heating system based on a revised feasibility study. The development of a general model for the future design of the heat exchanger station and the substations resulted in a design guideline which was used for the design of the heat exchanger station. KPEC selected the heat exchanger station CC02, located in area B1, as the object for the heat exchanger reconstruction. The station supplies 42 substations in 20 dwelling houses with a total heat demand of 11 MW. The design of the reconstruction began in the autumn of 1996. The equipment was procured during the spring of 1997 and the bulk of the installation work was finished by October 1997. The appointed design engineer participated in two study tours to Denmark. During the implementation the project was enlarged with an addendum. The addendum consisted of a modernisation of twelve building substations. The monitoring programme was enlarged accordingly and the efficiency of the two solutions were compared and evaluated through the monitoring programme. Even though some of the data are rather limited, the monitoring programme reveals a tendency towards the substation modernisation being twice as efficient as the heat exchanger modernisation. The reconstruction of the heat exchanger station has indicated a heat saving potential of 10% whereas the substation project has indicated a heat saving potential of 20%. The project further shows a huge potential for power savings in the main pumps due to the automatic control. (EHS)

  15. The ANGSTREM project: present status and development activities

    International Nuclear Information System (INIS)

    Stepanov, V.S.; Legyuenko, S.K.; Grigoriev, O.G.; Gromov, B.F.; Dedul, A.V.; Leonchyk, M.P.; Pashkin, Yu.G.; Pankratov, D.V.; Chekunov, V.V.; Skorikov, D.E.

    1998-01-01

    The project ANGSTREM of a modular-transportable nuclear power-and-heating station with assured safety for remote areas is described. The station is based on fast nuclear reactor cooling by a lead-bismuth eutectic. The possible evolution of the project is mentioned in relation to possible new application - sea water desalination or refrigeration plants. (author)

  16. Market drivers and challenges for gasification-based power plants in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Juergen Karg; Frank Hannemann [Siemens Power Generation (PG) (Germany)

    2006-07-01

    The paper begins by examining the present situation and future trends in the power generation market, before discussing existing IGCC plants and present market activities. IGCC plants in which Siemens are involved are given and coal-based IGCC applications are described. Finally improvement potential of IGCC, and technologies towards zero emission plants (including CO{sub 2} capture and sequestration) are discussed. 19 refs., 7 figs., 3 tabs.

  17. Shippingport: Overall project progress

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1989-01-01

    The Shippingport atomic power station (SAPS) consisted of the nuclear steam supply system and associated radioactive waste processing systems, which were owned by the US Department of Energy (DOE), and the balance of plant, owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania, on 7 acres of land leased by DOE from Duquesne Light Company. The Shippingport Station Decommissioning Project (SSDP) is being performed under contract to the DOE by the General Electric Company (GE) and its preselected subcontractor, MK-Ferguson Company, as the decommissioning operations contractor (DOC). This paper describes the decommissioning work that has been accomplished since July 1988, and the project's cost and schedule status. As the first decommissioning of a commercial, full-scale nuclear power plant, the SSDP is expected to set the standards for the demolition of future nuclear power plants

  18. Empirical approach for real-time estimation of air flow rates in a subway station

    OpenAIRE

    Di Perna, Costanzo; Carbonari, Alessandro; Ansuini, Roberta; Casals Casanova, Miquel

    2014-01-01

    The EU-funded project called SEAM4US (Sustainable Energy mAnageMent for Underground Stations) is targeted to define advanced control systems for cost-effective management of subway stations, which will be applied to the pilot Peer Reviewed

  19. Space Station Environmental Health System water quality monitoring

    Science.gov (United States)

    Vincze, Johanna E.; Sauer, Richard L.

    1990-01-01

    One of the unique aspects of the Space Station is that it will be a totally encapsulated environment and the air and water supplies will be reclaimed for reuse. The Environmental Health System, a subsystem of CHeCS (Crew Health Care System), must monitor the air and water on board the Space Station Freedom to verify that the quality is adequate for crew safety. Specifically, the Water Quality Subsystem will analyze the potable and hygiene water supplies regularly for organic, inorganic, particulate, and microbial contamination. The equipment selected to perform these analyses will be commercially available instruments which will be converted for use on board the Space Station Freedom. Therefore, the commercial hardware will be analyzed to identify the gravity dependent functions and modified to eliminate them. The selection, analysis, and conversion of the off-the-shelf equipment for monitoring the Space Station reclaimed water creates a challenging project for the Water Quality engineers and scientists.

  20. Simple simulation training system for short-wave radio station

    Science.gov (United States)

    Tan, Xianglin; Shao, Zhichao; Tu, Jianhua; Qu, Fuqi

    2018-04-01

    The short-wave radio station is a most important transmission equipment of our signal corps, but in the actual teaching process, which exist the phenomenon of fewer equipment and more students, making the students' short-wave radio operation and practice time is very limited. In order to solve the above problems, to carry out shortwave radio simple simulation training system development is very necessary. This project is developed by combining hardware and software to simulate the voice communication operation and signal principle of shortwave radio station, and can test the signal flow of shortwave radio station. The test results indicate that this system is simple operation, human-machine interface friendly and can improve teaching more efficiency.

  1. Developing CCUS system models to handle the complexity of multiple sources and sinks: An update on Tasks 5.3 and 5.4

    Energy Technology Data Exchange (ETDEWEB)

    Middleton, Richard Stephen [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-22

    This presentation is part of US-China Clean Coal project and describes the impact of power plant cycling, techno economic modeling of combined IGCC and CCS, integrated capacity generation decision making for power utilities, and a new decision support tool for integrated assessment of CCUS.

  2. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  3. Report of year 2000 version on feasibility study for joint implementation. Repowering project of Ashuganji Thermal Power Station

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on the repowering project of Ashuganji Thermal Power Station in the People's Republic of Bangladesh to link the project to the clean development mechanism (CDM). The project calls for adding gas turbines respectively having output of 31 MW to the existing units No. 3, 4 and 5 (each having an output of 150 MW) to make the plant into the waste gas re-combustion type compound cycle system. The construction cost would be 140 billion yen. The annual reduction of fuel per unit would be 28 kt, which can result in reduction of 2.1 million tons from the three units over the period of 25 years. The annual reduction in CO2 emission from a unit would be 77 kt, resulting in reduction of 5.8 million tons from the three units over 25 years. The return on investment effect was evaluated. In the main case (the output increase as a result of the repowering is used to supplement the current power supply shortage), the required period to recover the investment will be ten years on the basis of introducing private sector fund, but the internal profitability would be 8.09%, being far below the discount rate of 15%, and the current discount worth is also negative, hence the project would not be feasible. However, since there are no problems in repaying the loans, application of the low-interest special Yen loan is desired to eliminate the state of chronic power shortage. The discharge right transaction case (550 yen/ton of CO2) was also found unworkable to recover the investment. (NEDO)

  4. Report of year 2000 version on feasibility study for joint implementation. Repowering project of Ashuganji Thermal Power Station

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on the repowering project of Ashuganji Thermal Power Station in the People's Republic of Bangladesh to link the project to the clean development mechanism (CDM). The project calls for adding gas turbines respectively having output of 31 MW to the existing units No. 3, 4 and 5 (each having an output of 150 MW) to make the plant into the waste gas re-combustion type compound cycle system. The construction cost would be 140 billion yen. The annual reduction of fuel per unit would be 28 kt, which can result in reduction of 2.1 million tons from the three units over the period of 25 years. The annual reduction in CO2 emission from a unit would be 77 kt, resulting in reduction of 5.8 million tons from the three units over 25 years. The return on investment effect was evaluated. In the main case (the output increase as a result of the repowering is used to supplement the current power supply shortage), the required period to recover the investment will be ten years on the basis of introducing private sector fund, but the internal profitability would be 8.09%, being far below the discount rate of 15%, and the current discount worth is also negative, hence the project would not be feasible. However, since there are no problems in repaying the loans, application of the low-interest special Yen loan is desired to eliminate the state of chronic power shortage. The discharge right transaction case (550 yen/ton of CO2) was also found unworkable to recover the investment. (NEDO)

  5. An aerial radiological survey of the South Texas Project Electric Generating Station and surrounding area, Bay City, Texas

    International Nuclear Information System (INIS)

    Thompson, J.M.

    1988-12-01

    An aerial radiological survey was conducted over the South Texas Project Electric Generating Station (STPEGS) near Bay City, Texas, during the period 25 March to 4 April 1988. The purpose of the 259-square-kilometer (100-square-mile) survey was to document the terrestrial gamma environment of the plant and surrounding area. An exposure rate contour map at 1 meter above ground level (AGL) was constructed from the gamma data and overlaid on an aerial photograph and map of the area. Exposure rates were observed up to 10μR/h over land. No areas of enhanced exposure rates were observed. Ground-based exposure rate measurements and soil samples were obtained to support the aerial data. Oblique aerial photographs of the plant were also acquired during the survey. 9 refs., 4 figs., 1 tab

  6. The computing and data infrastructure to interconnect EEE stations

    Science.gov (United States)

    Noferini, F.; EEE Collaboration

    2016-07-01

    The Extreme Energy Event (EEE) experiment is devoted to the search of high energy cosmic rays through a network of telescopes installed in about 50 high schools distributed throughout the Italian territory. This project requires a peculiar data management infrastructure to collect data registered in stations very far from each other and to allow a coordinated analysis. Such an infrastructure is realized at INFN-CNAF, which operates a Cloud facility based on the OpenStack opensource Cloud framework and provides Infrastructure as a Service (IaaS) for its users. In 2014 EEE started to use it for collecting, monitoring and reconstructing the data acquired in all the EEE stations. For the synchronization between the stations and the INFN-CNAF infrastructure we used BitTorrent Sync, a free peer-to-peer software designed to optimize data syncronization between distributed nodes. All data folders are syncronized with the central repository in real time to allow an immediate reconstruction of the data and their publication in a monitoring webpage. We present the architecture and the functionalities of this data management system that provides a flexible environment for the specific needs of the EEE project.

  7. The computing and data infrastructure to interconnect EEE stations

    Energy Technology Data Exchange (ETDEWEB)

    Noferini, F., E-mail: noferini@bo.infn.it [Museo Storico della Fisica e Centro Studi e Ricerche “Enrico Fermi”, Rome (Italy); INFN CNAF, Bologna (Italy)

    2016-07-11

    The Extreme Energy Event (EEE) experiment is devoted to the search of high energy cosmic rays through a network of telescopes installed in about 50 high schools distributed throughout the Italian territory. This project requires a peculiar data management infrastructure to collect data registered in stations very far from each other and to allow a coordinated analysis. Such an infrastructure is realized at INFN-CNAF, which operates a Cloud facility based on the OpenStack opensource Cloud framework and provides Infrastructure as a Service (IaaS) for its users. In 2014 EEE started to use it for collecting, monitoring and reconstructing the data acquired in all the EEE stations. For the synchronization between the stations and the INFN-CNAF infrastructure we used BitTorrent Sync, a free peer-to-peer software designed to optimize data syncronization between distributed nodes. All data folders are syncronized with the central repository in real time to allow an immediate reconstruction of the data and their publication in a monitoring webpage. We present the architecture and the functionalities of this data management system that provides a flexible environment for the specific needs of the EEE project.

  8. The computing and data infrastructure to interconnect EEE stations

    International Nuclear Information System (INIS)

    Noferini, F.

    2016-01-01

    The Extreme Energy Event (EEE) experiment is devoted to the search of high energy cosmic rays through a network of telescopes installed in about 50 high schools distributed throughout the Italian territory. This project requires a peculiar data management infrastructure to collect data registered in stations very far from each other and to allow a coordinated analysis. Such an infrastructure is realized at INFN-CNAF, which operates a Cloud facility based on the OpenStack opensource Cloud framework and provides Infrastructure as a Service (IaaS) for its users. In 2014 EEE started to use it for collecting, monitoring and reconstructing the data acquired in all the EEE stations. For the synchronization between the stations and the INFN-CNAF infrastructure we used BitTorrent Sync, a free peer-to-peer software designed to optimize data syncronization between distributed nodes. All data folders are syncronized with the central repository in real time to allow an immediate reconstruction of the data and their publication in a monitoring webpage. We present the architecture and the functionalities of this data management system that provides a flexible environment for the specific needs of the EEE project.

  9. A10 – UAS Control Station Ergo-nomics Considerations : Tasks CS-6 through CS-8

    Science.gov (United States)

    2017-08-01

    The overall objective of the control station tasks within Project A-10 is to provide the Federal Aviation Administration (FAA) with information on an ergonomic design of unmanned aircraft system (UAS) control stations which will allow safe piloting o...

  10. Impact of Ontario electricity industry structure on the viability of cogeneration projects

    International Nuclear Information System (INIS)

    Chuddy, B.

    1999-01-01

    A review of Ontario Hydro's existing market structure and how its move toward a more competitive profile can be advantageous for cogeneration projects was presented. Ontario's existing electric power supply is as follows: 6 fossil fuels stations generate a total of 9, 969 MW of electricity, 23 NUG stations generate 1,541 MW, 3 nuclear stations generate a total of 9,028 MW and 69 hydro-electric stations generates 6,751 MW of electricity. The criteria and characteristics for cogeneration projects were listed. The paper also discussed other topics such as the market price of power, outstanding regulatory issues, market volatility and relative pricing. The prognosis for Ontario cogeneration projects for the early years from 1999-2004 is that for economic reasons, only big projects with large loads of 200 to 800 MW will be considered. In later years, other projects will become economic

  11. Wind-powered electrical systems : highway rest areas, weigh stations, and team section buildings.

    Science.gov (United States)

    2009-02-01

    This project considered the use of wind for providing electrical power at Illinois Department of Transportation : (IDOT) highway rest areas, weigh stations, and team section buildings. The goal of the project was to determine : the extent to which wi...

  12. PROJECT OF POLLUTANTS SEPARATOR FROM THE GAS STATION

    Directory of Open Access Journals (Sweden)

    Barbara Kościelnik

    2016-06-01

    Full Text Available Oily wastewater are dangerous for the environment, because they can contaminate ground water or surface, which can lead to contamination of the biosystem or poisoning of humans and animals. The treatment plant of this kind may include petroleum products or substances derived from natural gas, crude oil, asphalt or natural wax. Of course, in the wastewater oily you cannot forget about vegetable oils used in catering. Waste water of this type to be cleaned are subjected to the following processes: flotation, sedimentation, filtration, flowing out, thermal methods, biodegradation, adsorption or chemical and thermal methods to destabilize the emulsion. The aim of this study was to design a separator pollution from the gas station. We present the investment and operating costs. In designing the system chosen individual process units based on the requirements of the quality of wastewater specified in PN - EU 858.

  13. Information management for nuclear power stations: project description

    International Nuclear Information System (INIS)

    Halpin, D.W.

    1978-03-01

    A study of the information management structure required to support nuclear power plant construction was performed by a joint university-industry group under the sponsorship of the Department of Energy (DOE), formerly the Energy Research and Development Administration (ERDA). The purpose of this study was (1) to study methods for the control of information during the construction and start-up of nuclear power plants, and (2) identify those data elements intrinsic to nuclear power plants which must be maintained in a structured format for quick access and retrieval. Maintenance of the massive amount of data needed for control of a nuclear project during design, procurement, construction, start-up/testing, and operational phases requires a structuring which allows immediate update and retrieval based on a wide variety of access criteria. The objective of the research described has been to identify design concepts which support the development of an information control system responsive to these requirements. A conceptual design of a Management Information Data Base System which can meet the project control and information exchange needs of today's large nuclear power plant construction projects has been completed and an approach recommended for development and implementation of a complete operational system

  14. National FCEV and Hydrogen Fueling Station Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Brian; Melaina, Marc

    2016-06-09

    This presentation provides a summary of the FY16 activities and accomplishments for NREL's national fuel cell electric vehicle (FCEV) and hydrogen fueling station scenarios project. It was presented at the U.S. Department of Energy Hydrogen and Fuel Cells Program 2016 Annual Merit Review and Peer Evaluation Meeting on June 9, 2016, in Washington, D.C.

  15. Tedese Project

    Science.gov (United States)

    Buforn, E.; Davila, J. Martin; Bock, G.; Pazos, A.; Udias, A.; Hanka, W.

    The TEDESE (Terremotos y Deformacion Cortical en el Sur de España) project is a joint project of the Universidad Complutense de Madrid (UCM) and Real Instituto y Observatorio de la Armada de San Fernando, Cadiz (ROA) supported by the Spanish Ministerio de Ciencia y Tecnologia with the participation of the GeoforschungZen- trum, Potsdam (GFZ). The aim is to carry out a study of the characteristics of the oc- currence and mechanism of earthquakes together with measurements of crustal struc- ture and deformations in order to obtain an integrated evaluation of seismic risk in southern Spain from. As part of this project a temporal network of 10 broad-band seismological stations, which will complete those already existing in the zone, have been installed in southern Spain and northern Africa for one year beginning in October 2001. The objectives of the project are the study in detail of the focal mechanisms of earthquakes in this area, of structural in crust and upper mantle, of seismic anisotropy in crust and mantle as indicator for tectonic deformation processed and the measure- ments of crustal deformations using techniques with permanent GPS and SLR stations and temporary GPS surveys. From these studies, seismotectonic models and maps will be elaborated and seismic risk in the zone will be evaluated.

  16. Breadth of Scientific Activities and Network Station Specifications in the International GPS Service (IGS)

    Science.gov (United States)

    Moore, A. W.; Neilan, R. E.; Springer, T. A.; Reigber, Ch.

    2000-01-01

    A strong multipurpose aspect of the International GPS Service (IGS) is revealed by a glance at the titles of current projects and working groups within the IGS: IGS/BIPM Time Transfer Project; Ionosphere Working Group; Troposphere Working Group; International GLONASS Experiment; Working Group on Low-Earth Orbiter Missions; and Tide Gauges, CGPS, and the IGS. The IGS network infrastructure, in large part originally commissioned for geodynamical investigations, has proved to be a valuable asset in developing application-oriented subnetworks whose requirements overlap the characteristics of existing IGS stations and future station upgrades. Issues encountered thus far in the development of multipurpose or multitechnique IGS projects as well as future possibilities will be reviewed.

  17. Swedish encapsulation station review

    International Nuclear Information System (INIS)

    Andersson, Sven Olof; Brunzell, P.; Heibel, R.; McCarthy, J.; Pennington, C.; Rusch, C.; Varley, G.

    1998-06-01

    In the Encapsulation Station (ES) Review performed by NAC International, a number of different areas have been studied. The main objectives with the review have been to: Perform an independent review of the cost estimates for the ES presented in SKB's document 'Plan 1996'. This has been made through comparisons between the ES and BNFL's Waste Encapsulation Plant (WEP) at Sellafield as well as with the CLAB facility. Review the location of the ES (at the CLAB site or at the final repository) and its interaction with other parts of the Swedish system for spent fuel management. Review the logistics and plant capacity of the ES. Identify important safety aspects of the ES as a basis for future licensing activities. Based on NAC International's experience of casks for transport and storage of spent fuel, review the basic design of the copper/steel canister and the transport cask. This review insides design, manufacturing, handling and licensing aspects. Perform an overall comparison between the ES project and the CLAB project with the objective to identify major project risks and discuss their mitigation

  18. Prospect and problems of gas based power stations of NTPC

    International Nuclear Information System (INIS)

    Suryanarayana, A.

    1993-01-01

    The policy of the Government of India concerning utilisation of natural gas resources of the country has undergone changes over the last few years. The government decided in 1985 to allocate natural gas for power generation and in the year 1986 approved the setting up of the first series of three gas based combined cycle power projects of National Thermal Power Corporation (NTPC). The problems of gas power stations of NTPC are discussed. These are high cost of generation, completion of transmission line works to match with the commissioning of gas power stations, high price of natural gas, and fixation of tariff for sale of power from gas based power stations. (N.B.)

  19. Safety Distances for hydrogen filling stations

    Energy Technology Data Exchange (ETDEWEB)

    Matthijsen, A. J. C. M.; Kooi, E. S.

    2005-07-01

    In the Netherlands there is a growing interest in using natural gas as a transport fuel. The most important drivers behind this development are formed by poor inner city air quality and the decision to close several LPG filling stations. Dwellings are not allowed within the safety distances of 45 or 110 meters from the tanker filling point of these LPG stations, depending on the capacity of the station. Another driver is global warming. We are carrying out a study on station supply, compression, storage and filling for natural gas stations, and a similar, simultaneous study on hydrogen as a followup to our risk analysis for the hydrogen filling station in Amsterdam. Here, three buses drive on hydrogen as part of the European CUTE project. Driving on natural gas is an important step in the transition to cars on hydrogen. This study was commissioned by the Dutch Ministry of Spatial Planning, Housing and the Environment to advise on external safety aspects of future hydrogen filling stations. According to Dutch law homes may not be built within an individual risk contour of 10-6 per year of a dangerous object, such as a plant with hazardous materials or a filling station. An individual risk contour of 10-6 is represented by a line around a dangerous object that connects locations with an individual risk level of 10-6 per year. An individual 'located' within this contour line has a chance of one per million per year or more to be killed as a result of an accident caused by this object. The longest distance between the object and such a contour is called a 'safety distance'. A study on safety distances is now in progress for different kinds of hydrogen filling stations (e. g. gaseous and liquid hydrogen) and for different capacities, such as big, medium and small stations. The focus is on different kinds of hydrogen production and the hydrogen supply of the filling station. To decide on the design and supply of the hydrogen station, we examined the

  20. A computer-based system for environmental impact assessment (EIA) applications to energy power stations in Turkey: CEDINFO

    Energy Technology Data Exchange (ETDEWEB)

    Say, Nuriye Peker; Yuecel, Muzaffer [Cukurova University, Adana (Turkey). Department of Landscape Architecture; Yilmazer, Mehmet [Bogazici University, Kandilli, Istanbul (Turkey). Kandilli Observatory and Earthquake Research Institute

    2007-12-15

    Environmental impact assessment (EIA) is a tool for decision makers to take into account the possible effects of a proposed project on the environment and is also a process for collecting the data related to a project design and project area. Different techniques are used for the EIA process. In recent years, including the design and development of databases, classification systems, computer models and expert systems have been used extensively in impact assessment studies. Knowledge-based systems referred to as expert systems and different computer-based systems are an emerging technology in information processing and are becoming increasingly useful tools in different applications areas including EIA studies. Their use for EIA has been quite limited in developing countries, because of the constraints on resources, particularly in expertise and data. In this study, a knowledge-based software - CEDINFO - developed by authors was introduced. CEDINFO to be used for EIA practices on energy-generating stations was designed based on the legal EIA process in Turkey. According to the EIA Regulation enacted in Turkey in 1993, energy-generating stations (thermal power station, hydraulic station, nuclear station) in different categories require mandatory EIA reports duly approved by The Ministry of Environment and Forestry before their construction. CEDINFO primarily aims to provide educational support for EIA practices and decision-makers on energy-generating stations. (author)

  1. A computer-based system for environmental impact assessment (EIA) applications to energy power stations in Turkey: CEDINFO

    Energy Technology Data Exchange (ETDEWEB)

    Nuriye Peker Say; Muzaffer Yucel; Mehmet Yilmazer [Cukurova University, Adana (Turkey). Department of Landscape Architecture

    2007-12-15

    Environmental impact assessment (EIA) is a tool to enable decision makers to account for the possible effects of a proposed project on the environment and is also a process for collecting the data related to a project design and project area. Different techniques are used for the EIA process. In recent years, including the design and development of databases, classification systems, computer models and expert systems have been used extensively in impact assessment studies. Knowledge-based systems referred to as expert systems and different computer-based systems are an emerging technology in information processing and are becoming increasingly useful tools in different applications areas including EIA studies. Their use for EIA has been quite limited in developing countries, because of the constraints on resources, particularly in expertise and data. In this study, a knowledge-based software CEDINFO developed by authors was introduced. CEDINFO to be used for EIA practices on energy-generating stations was designed based on the legal EIA process in Turkey. According to the EIA Regulation enacted in Turkey in 1993, energy-generating stations (thermal power stations, hydroelectric power stations, nuclear power stations) in different categories require mandatory EIA reports duly approved by The Ministry of Environment and Forestry before their construction. CEDINFO primarily aims to provide educational support for EIA practices and decision-makers on energy-generating stations. 23 refs., 5 figs., 2 tabs.

  2. A computer-based system for environmental impact assessment (EIA) applications to energy power stations in Turkey: CEDINFO

    International Nuclear Information System (INIS)

    Say, Nuriye Peker; Yuecel, Muzaffer; Yilmazer, Mehmet

    2007-01-01

    Environmental impact assessment (EIA) is a tool for decision makers to take into account the possible effects of a proposed project on the environment and is also a process for collecting the data related to a project design and project area. Different techniques are used for the EIA process. In recent years, including the design and development of databases, classification systems, computer models and expert systems have been used extensively in impact assessment studies. Knowledge-based systems referred to as expert systems and different computer-based systems are an emerging technology in information processing and are becoming increasingly useful tools in different applications areas including EIA studies. Their use for EIA has been quite limited in developing countries, because of the constraints on resources, particularly in expertise and data. In this study, a knowledge-based software-CEDINFO-developed by authors was introduced. CEDINFO to be used for EIA practices on energy-generating stations was designed based on the legal EIA process in Turkey. According to the EIA Regulation enacted in Turkey in 1993, energy-generating stations (thermal power station, hydraulic station, nuclear station) in different categories require mandatory EIA reports duly approved by The Ministry of Environment and Forestry before their construction. CEDINFO primarily aims to provide educational support for EIA practices and decision-makers on energy-generating stations

  3. STRUVE arc and EUPOS® stations

    Science.gov (United States)

    Lasmane, Ieva; Kaminskis, Janis; Balodis, Janis; Haritonova, Diana

    2013-04-01

    The Struve Geodetic Arc was developed in Years 1816 to 1855, 200 years ago. Historic information on the points of the Struve Geodetic Arc are included in the UNESCO World Heritage list in 2005. Nevertheless, the sites of many points are still not identified nor included in the data bases nowadays. Originally STRUVE arc consisted of 258 main triangles with 265 triangulation points. Currently 34 of the original station points are identified and included in the in the UNESCO World Heritage list. identified original measurement points of the Meridian Arc are located in Sweden (7 points), Norway (15), Finland (83), Russia (1), Estonia (22), Latvia (16), Lithuania (18), Belorussia (28), Ukraine (59) and Moldova (27). In Year 2002 was initiated another large coverage project - European Position Determination System "EUPOS®". Currently there are about 400 continuously operating GNSS (Global Navigation Satellite Systems) stations covering EU countries Estonia, Latvia, Lithuania, Poland, Czech Republic, Slovakia, Hungary, Bulgaria, Romania and East European countries Ukraine and Moldavia. EUPOS® network is a ground based GNSS augmentation system widely used for geodesy, land surveying, geophysics and navigation. It gives the opportunity for fast and accurate position determination never available before. It is an honorable task to use the EUPOS® system for research of the Struve triangulation former sites. Projects with Struve arc can popularize geodesy, geo-information and its meaning in nowadays GIS and GNSS systems. Struve Arc and its points is unique cooperation cross-border object which deserve special attention because of their natural beauty and historical value for mankind. GNSS in geodesy discovers a powerful tool for the verification and validation of the height values of geodetic leveling benchmarks established historically almost 200 years ago. The differential GNSS and RTK methods appear very useful to identify vertical displacement of landscape by means of

  4. Space Station automation and robotics

    Science.gov (United States)

    1987-01-01

    A group of fifteen students in the Electrical Engineering Department at the University of Maryland, College Park, has been involved in a design project under the sponsorship of NASA Headquarters, NASA Goddard Space Flight Center and the Systems Research Center (SRC) at UMCP. The goal of the NASA/USRA project was to first obtain a refinement of the design work done in Spring 1986 on the proposed Mobile Remote Manipulator System (MRMS) for the Space Station. This was followed by design exercises involving the OMV and two armed service vehicle. Three students worked on projects suggested by NASA Goddard scientists for ten weeks this past summer. The knowledge gained from the summer design exercise has been used to improve our current design of the MRMS. To this end, the following program was undertaken for the Fall semester 1986: (1) refinement of the MRMS design; and (2) addition of vision capability to our design.

  5. Cost comparison of 4x500 MW coal-fuelled and 4x850 MW CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Costa, M.

    1981-01-01

    The lifetime costs for a 4x850 MW CANDU generating station are compared to those for 4x500 MW bituminous coal-fuelled generating stations. Two types of coal-fuelled stations are considered; one burning U.S. coal which includes flue gas desulfurization and one burning Western Canadian coal. Current estimates for the capital costs, operation and maintenance costs, fuel costs, decommissioning costs and irradiated fuel management costs are shown. The results show: (1) The accumulated discounted costs of nuclear generation, although initially higher, are lower than coal-fuelled generation after two or three years. (2) Fuel costs provide the major contribution to the total lifetime costs for coal-fuelled stations whereas capital costs are the major item for the nuclear station. (3) The break even lifetime capacity factor between nuclear and U.S. coal-fuelled generation is projected to be 5%; that for nuclear and Canadian coal-fuelled generation is projected to be 9%. (4) Large variations in the costs are required before the cost advantage of nuclear generation is lost. (5) Comparison with previous results shows that the nuclear alternative has a greater cost advantage in the current assessment. (6) The total unit energy cost remains approximately constant throughout the station life for nuclear generation while that for coal-fuelled generation increases significantly due to escalating fuel costs. The 1978 and 1979 actual total unit energy cost to the consumer for several Ontario Hydro stations are detailed, and projected total unit energy costs for several Ontario Hydro stations are shown in terms of escalated dollars and in 1980 constant dollars

  6. The Space Station Module Power Management and Distribution automation test bed

    Science.gov (United States)

    Lollar, Louis F.

    1991-01-01

    The Space Station Module Power Management And Distribution (SSM/PMAD) automation test bed project was begun at NASA/Marshall Space Flight Center (MSFC) in the mid-1980s to develop an autonomous, user-supportive power management and distribution test bed simulating the Space Station Freedom Hab/Lab modules. As the test bed has matured, many new technologies and projects have been added. The author focuses on three primary areas. The first area is the overall accomplishments of the test bed itself. These include a much-improved user interface, a more efficient expert system scheduler, improved communication among the three expert systems, and initial work on adding intermediate levels of autonomy. The second area is the addition of a more realistic power source to the SSM/PMAD test bed; this project is called the Large Autonomous Spacecraft Electrical Power System (LASEPS). The third area is the completion of a virtual link between the SSM/PMAD test bed at MSFC and the Autonomous Power Expert at Lewis Research Center.

  7. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  8. Challenges with the largest commercial hydrogen station in the world

    Energy Technology Data Exchange (ETDEWEB)

    Charbonneau, Thomas; Gauthier, Pierre [Air Liquide Canada (Canada)

    2010-07-01

    This abstract's objective is to share with the participants the story of the largest hydrogen fueling station made to this date and to kick-start the story, we will cover the challenges; first the technical ones; the operational ones; the distribution ones and; the financial ones. We will then move on to review the logistic (geographic) issues raised by the project and conclude our presentation by sharing the output values of the largest fueling station built so far in the world. (orig.)

  9. Ground-based multi-station spectroscopic imaging with ALIS. - Scientific highlights, project status and future prospects

    Science.gov (United States)

    Brändström; Gustavsson, Björn; Pellinen-Wannberg, Asta; Sandahl, Ingrid; Sergienko, Tima; Steen, Ake

    2005-08-01

    The Auroral Large Imaging System (ALIS) was first proposed at the ESA-PAC meeting in Lahnstein 1989. The first spectroscopic imaging station was operational in 1994, and since then up to six stations have been in simultaneous operation. Each station has a scientific-grade CCD-detector and a filter-wheel for narrow-band interference-filters with six positions. The field-of-view is around 70°. Each imager is mounted in a positioning system, enabling imaging of a common volume from several sites. This enables triangulation and tomography. Raw data from ALIS is freely available at ("http://alis.irf.se") and ALIS is open for scientific colaboration. ALIS made the first unambiguous observations of Radio-induced optical emissions at high latitudes, and the detection of water in a Leonid meteor-trail. Both rockets and satellite coordination are considered for future observations with ALIS.

  10. Double-Station Automatic Video Observation of the Meteors

    Czech Academy of Sciences Publication Activity Database

    Vítek, S.; Koten, Pavel; Páta, P.; Fliegel, K.

    2010-01-01

    Roč. 2010, - (2010), 943145/1-943145/4 ISSN 1687-7969 R&D Projects: GA ČR GA205/09/1302 Grant - others:GA ČR(CZ) GA102/09/0997 Institutional research plan: CEZ:AV0Z10030501 Keywords : double station observation * video technique Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  11. Socio-economic impacts of nuclear generating stations: summary report on the NRC post-licensing studies

    International Nuclear Information System (INIS)

    Chalmers, J.; Pijawka, D.; Branch, K.; Bergmann, P.; Flynn, J.; Flynn, C.

    1982-07-01

    Information is presented concerning the conceptual framework for the assessment of socioeconomic impacts; methodology for the post-licensing case studies; socioeconomic changes due to the construction and operation of nuclear generating stations; public response to the construction and operation of nuclear generating stations; socioeconomic consequences of the accident at Three Mile Island; the significance of socioeconomic change due to the construction and operation of nuclear generating stations; findings of the post-licensing studies relative to the nuclear station impact literature; and implications of the findings for projective assessments and planning studies

  12. Tapping the hidden potential Eddystone station's comprehensive effort to improve heat rate

    International Nuclear Information System (INIS)

    Wusinich, D.F.; McCreight, M.K.

    1992-01-01

    Eddystone Generating Station in the past nine months has launched a successful new process for improving thermal performance. This process mobilizes people -- the entire station organization -- to step up to its day-today commitment, and its work effectiveness, to achieve higher thermal performance. A unique management and organization improvement process, called the Breakthrough Strategy, is a key factor in the success. This is a process for involving people in actual work improvement projects as the foundation for building sustainable, higher levels of organizational performance. This paper describes the process, how it was launched, and how it is becoming a way of life -- a foundation for continuous improvement throughout the station. It also reports how much impact non-technical factors really have on station performance. 4 figs

  13. Gentilly-2 refurbishment pre-project

    International Nuclear Information System (INIS)

    Pageau, Rene; Doyon, Martial; Rheaume, M.R.

    2002-01-01

    The conceptual design life of Gentilly-2 station is 30 years and the station was put in service in 1982. Hydro-Quebec has initiated a project to assess the refurbishment of the station in the horizon 2008-2010 and for an expected life extension of 25 years. The reactor has been successfully operated since its first full-power operation in early 80's, nearly 20 years ago. Although the overall performance of Gentilly-2 continues to be very good, it is reasonable to expect that age-related degradation of key plant components will have an increasing impact on operations as the plant continues to age. The replacement of the reactor channels component is required around 2008-2009. The replacement of the reactor tubes is a major activity and it is necessary to assess the capability of the station to operate safely and reliably for a an extended period of 25 years bringing the design life of the station to over 50 years. The challenges associated with extended life operation until at least 2030-33 horizon are to maintain the margin of safety for plant operations by ensuring reliability of safety-related systems, to reduce plant unavailability due to age-related component failures, and to minimize the costs for repairs and replacement of aging components. As shown on the next figure, the overall project is expected to spread over an 8 years period starting in 2001. A project feasibility study (phase-1) of four (4) years has been planned to assess the plant condition and to make an overall safety review. This project phase will confirm the economical viability of extended operation. A period of thirty-nine (39) months would be necessary for the procurement and manufacturing of all the reactor components, and for the engineering work related to safety and economic improvements. Reactor channel replacement is planned for an outage not exceeding 18 months. (author)

  14. Strategy for success in maintenance management at Point Lepreau nuclear generating station

    International Nuclear Information System (INIS)

    White, R.M.

    1987-01-01

    Improvements in availability of the station and in productivity of workers were achieved at Point Lepreau Nuclear Generating Station through implementation of a Maintenance Management System, which incorporates work planning and outage management techniques. Eight software systems on a VAX 11/70 minicomputer control work orders, temporary and permanent design changes, parts and material inventories, time keeping, and project management. All maintenance is coordinated through a regular planning meeting

  15. Fuel efficiency, availability and compressor station configuration

    Energy Technology Data Exchange (ETDEWEB)

    Lubomirsky, Matt; Kurz, Rainer [Solar Turbines Inc., San Diego, CA (United States); Klimov, Pavel [Intergas Central Asia, Astana (Kazakhstan)

    2009-12-19

    Compressor stations play a very important role in the success of a gas pipeline design and a careful selection of centrifugal compressors and drivers are key aspects for the success of the project. The state of the art design available today for this equipment provides overall high thermodynamic performance and consequently minimizes installed power requirements and energy usage with significant savings on operating expenses during the economic life of the project For any application of machinery in a pipeline compression station, one of the key questions to answer is the number of units to install to meet the flow requirements of the pipeline. Depending on the load profile of the pipeline, the answers may look different. Other factors to consider include the fact that gas turbines can produce a significant amount of additional power at lower ambient temperatures. So, even for constant load of the pipeline, the relative load of the driver changes. In this paper, a typical transcontinental pipeline with multiple compressor stations is evaluated. The determination of the exact hydraulic behavior of the pipeline is part of the modeling effort. The site ambient conditions, with a significant swing in ambient temperatures are considered. The issue discussed in this paper evolves around the availability that can be achieved with various configurations, based on actually achieved reliability and availability numbers. The other large impact on operating costs, fuel consumption will be discussed. Here, the choice of the number of installed units has a distinct impact on annual fuel consumption, as well as the capacity of the pipeline during various scenarios. (author)

  16. GASIFICATION PLANT COST AND PERFORMANCE OPTIMIZATION

    Energy Technology Data Exchange (ETDEWEB)

    Samuel S. Tam

    2002-05-01

    The goal of this series of design and estimating efforts was to start from the as-built design and actual operating data from the DOE sponsored Wabash River Coal Gasification Repowering Project and to develop optimized designs for several coal and petroleum coke IGCC power and coproduction projects. First, the team developed a design for a grass-roots plant equivalent to the Wabash River Coal Gasification Repowering Project to provide a starting point and a detailed mid-year 2000 cost estimate based on the actual as-built plant design and subsequent modifications (Subtask 1.1). This unoptimized plant has a thermal efficiency of 38.3% (HHV) and a mid-year 2000 EPC cost of 1,681 $/kW. This design was enlarged and modified to become a Petroleum Coke IGCC Coproduction Plant (Subtask 1.2) that produces hydrogen, industrial grade steam, and fuel gas for an adjacent Gulf Coast petroleum refinery in addition to export power. A structured Value Improving Practices (VIP) approach was applied to reduce costs and improve performance. The base case (Subtask 1.3) Optimized Petroleum Coke IGCC Coproduction Plant increased the power output by 16% and reduced the plant cost by 23%. The study looked at several options for gasifier sparing to enhance availability. Subtask 1.9 produced a detailed report on this availability analyses study. The Subtask 1.3 Next Plant, which retains the preferred spare gasification train approach, only reduced the cost by about 21%, but it has the highest availability (94.6%) and produces power at 30 $/MW-hr (at a 12% ROI). Thus, such a coke-fueled IGCC coproduction plant could fill a near term niche market. In all cases, the emissions performance of these plants is superior to the Wabash River project. Subtasks 1.5A and B developed designs for single-train coal and coke-fueled power plants. This side-by-side comparison of these plants, which contain the Subtask 1.3 VIP enhancements, showed their similarity both in design and cost (1,318 $/kW for the

  17. 360 Degrees Project: Final Report of 1972-73. National Career Education Television Project.

    Science.gov (United States)

    Wisconsin Univ., Madison. Univ. Extension.

    Project 360 Degrees was a mass-media, multi-State, one-year effort in adult career education initiated by WHA-TV, the public television station of the University of Wisconsin-Extension, and funded by the U.S. Office of Education. The overall goal of the project was to provide, through a coordinated media system, information and motivation that…

  18. Trends in the capital costs of CANDU generating stations

    International Nuclear Information System (INIS)

    Yu, A.M.

    1982-09-01

    This paper consolidates the actual cost experience gained by Atomic Energy of Canada Limited, Ontario Hydro, and other Canadian electric utlities in the planning, design and construction of CANDU-PHWR (CANada Deuterium Uranium-Pressurized Heavy Water Reactor) generating stations over the past 30 years. For each of the major CANDU-PHWR generating stations in operation and under construction in Canada, an analysis is made to trace the evolution of the capital cost estimates. Major technical, economic and other parameters that affect the cost trends of CANDU-PHWR generating stations are identified and their impacts assessed. An analysis of the real cost of CANDU generating stations is made by eliminating interest during construction and escalation, and the effects of planned deferment of in-service dates. An historical trend in the increase in the real cost of CANDU power plants is established. Based on the cost experience gained in the design and construction of CANDU-PHWR units in Canada, as well as on the assessment of parameters that influence the costs of such projects, the future costs of CANDU-PHWRs are presented

  19. Determination of exposure due to mobile phone base stations in an epidemiological study

    International Nuclear Information System (INIS)

    Neitzke, H. P.; Osterhoff, J.; Peklo, K.; Voigt, H.

    2007-01-01

    To investigate a supposed relationship between exposure by mobile phone base stations and well-being, an epidemiological cross sectional study is carried out within the German Mobile Telecommunication Research Program. In a parallel project, a method for the classification of electromagnetic exposure due to mobile phone base stations has been developed. This is based on the results of measurements of high frequency immissions in the interior of more than 1100 rooms and at outdoor locations, the calculation of the emissions of mobile phone antennas under free space propagation conditions and empirically determined transmission factors for the propagation of electromagnetic waves in different types of residential areas for passage of walls and windows. Standard tests (correlation-test, kappa-test, Bland-Altman-Plot, analysis of sensitivity and specificity) show that the method for computational exposure assessment developed in this project is applicable for a first classification of exposures due to mobile phone base stations in epidemiological studies. (authors)

  20. Swedish encapsulation station review

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Sven Olof; Brunzell, P.; Heibel, R.; McCarthy, J.; Pennington, C.; Rusch, C.; Varley, G. [NAC International, Zuerich (Switzerland)

    1998-06-01

    In the Encapsulation Station (ES) Review performed by NAC International, a number of different areas have been studied. The main objectives with the review have been to: Perform an independent review of the cost estimates for the ES presented in SKB`s document `Plan 1996`. This has been made through comparisons between the ES and BNFL`s Waste Encapsulation Plant (WEP) at Sellafield as well as with the CLAB facility. Review the location of the ES (at the CLAB site or at the final repository) and its interaction with other parts of the Swedish system for spent fuel management. Review the logistics and plant capacity of the ES. Identify important safety aspects of the ES as a basis for future licensing activities. Based on NAC International`s experience of casks for transport and storage of spent fuel, review the basic design of the copper/steel canister and the transport cask. This review insides design, manufacturing, handling and licensing aspects. Perform an overall comparison between the ES project and the CLAB project with the objective to identify major project risks and discuss their mitigation 19 refs, 9 figs, 35 tabs

  1. The Misema generating station by CREC : the journey

    International Nuclear Information System (INIS)

    2003-01-01

    The Canadian Renewable Energy Corporation (CREC) was created in 2000 in response to the government's commitment to renewable energy. This publication presents a series of photographs illustrating the development of the Misema run-of-the river hydro generating station, including its 300 m long power tunnel from the intake to the powerhouse. The Misema project was the first in Ontario to run an underground tunnel to protect the river bank and reduce visual impact. It was also the first to have an underground power house that could withstand the 1 in 1,000 year flood. Connection to the grid is via a private 44,000 volt line. The station is fully automated to meet Ontario's power demand. Engineering and environmental approval for the project began in 2001, with construction starting in May 2001. The generating facility uses natural river flow to generate electricity, and is expected to play an important role in strengthening the electricity grid at its periphery and offer reliable power to thousands of customers. Small hydro also has minimal impact on the environment. CREC intends to make the site accessible to recreational canoeists, fishermen, geologists and tourists. The generating station was nearly completely constructed by local tradesmen and contractors, creating about 30,000 man-hours for the Englehart area. The Misema facility is contributing to Ontario's deregulated power market and has provided much needed electricity while reducing Ontario's greenhouse gas emissions. The facility was built to the highest international standards. figs

  2. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    Energy Technology Data Exchange (ETDEWEB)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage

  3. Wolf Creek Generating Station containment model

    International Nuclear Information System (INIS)

    Nguyen, D.H.; Neises, G.J.; Howard, M.L.

    1995-01-01

    This paper presents a CONTEMPT-LT/28 containment model that has been developed by Wolf Creek Nuclear Operating Corporation (WCNOC) to predict containment pressure and temperature behavior during the postulated events at Wolf Creek Generating Station (WCGS). The model has been validated using data provided in the WCGS Updated Safety Analysis Report (USAR). CONTEMPT-LT/28 model has been used extensively at WCGS to support plant operations, and recently, to support its 4.5% thermal power uprate project

  4. Performance Assessment of a Solar powered Air Quality and Weather Station Placed on a School Rooftop in Hong Kong

    Science.gov (United States)

    Summary of compact, roof version of a Village Green Project station installed on a secondary school rooftop in Hong Kong. Preliminary comparison of the station's data against nearby regulatory monitors are summarized.

  5. Defense Base Realignment and Closure Budget Data for Naval Air Technical Training Center, Naval Air Station Pensacola, Florida

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... This report provides the results of the audit of 19 projects, valued at $288.9 million, for the realignment of the Naval Air Technical Training Center from Naval Air Station Memphis, Tennessee, to Naval Air Station Pensacola, Florida...

  6. Lambda Station: Alternate network path forwarding for production SciDAC applications

    International Nuclear Information System (INIS)

    Grigoriev, Maxim; Bobyshev, Andrey; Crawford, Matt; DeMar, Phil; Grigaliunas, Vyto; Moibenko, Alexander; Petravick, Don; Newman, Harvey; Steenberg, Conrad; Thomas, Michael

    2007-01-01

    The LHC era will start very soon, creating immense data volumes capable of demanding allocation of an entire network circuit for task-driven applications. Circuit-based alternate network paths are one solution to meeting the LHC high bandwidth network requirements. The Lambda Station project is aimed at addressing growing requirements for dynamic allocation of alternate network paths. Lambda Station facilitates the rerouting of designated traffic through site LAN infrastructure onto so-called 'high-impact' wide-area networks. The prototype Lambda Station developed with Service Oriented Architecture (SOA) approach in mind will be presented. Lambda Station has been successfully integrated into the production version of the Storage Resource Manager (SRM), and deployed at US CMS Tier1 center at Fermilab, as well as at US-CMS Tier-2 site at Caltech. This paper will discuss experiences using the prototype system with production SciDAC applications for data movement between Fermilab and Caltech. The architecture and design principles of the production version Lambda Station software, currently being implemented as Java based web services, will also be presented in this paper

  7. Lichen flora around the Korean Antarctic Scientific Station, King George Island, Antarctic.

    Science.gov (United States)

    Kim, Ji Hee; Ahn, In-Young; Hong, Soon Gyu; Andreev, Mikhail; Lim, Kwang-Mi; Oh, Mi Jin; Koh, Young Jin; Hur, Jae-Seoun

    2006-10-01

    As part of the long-term monitoring projects on Antarctic terrestrial vegetation in relation to global climate change, a lichen floristical survey was conducted around the Korean Antarctic Station (King Sejong Station), which is located on Barton Peninsula, King George Island, in January and February of 2006. Two hundred and twenty-five lichen specimens were collected and sixty-two lichen species in 38 genera were identified by morphological characteristics, chemical constituents, TLC analysis and ITS nucleotide sequence analysis.

  8. Control of Flywheel Energy Storage Systems in Electrical Vehicle Charging Stations

    DEFF Research Database (Denmark)

    Sun, Bo

    energy storage system (FESS). The proposed PhD project supports a corresponding smart control strategy that could be termed “charging station to grid (CS2G)”. It explores the possibility of using a dedicated energy storage system (FESS) within the charging station to alleviate grid and market conditions...... converters is built and analyzed. |Based on modeling analysis, centralized and distributed control methods are both explored to realize the coordination control of each components in the system. Specially, this project proposes a “dc voltage vs speed” droop strategy for FESS control based on distributed bus...... function method when the system switches its operation behavior between two modes. Finally, a downscaled FCS prototype with FESS is built in the intelligent MG lab, and experiments and hardware-in-loop simulation results are conducted to verify the effectiveness and feasibility with the proposed FCS...

  9. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  10. Overcoming challenges: The Koeberg simulator project

    International Nuclear Information System (INIS)

    Marin, J: Bruchental, S.; Lagerwall, J.R.

    2006-01-01

    As the nuclear power simulation training industry matures, the needs of the individual training facilities are becoming increasingly diverse. To respond to this trend, simulation vendors must offer a greater level of customization, and as such, are facing increasingly challenging projects. In 2002, CAE embarked on such a project for South Africas Koeberg nuclear power station. This simulator upgrade project, carried out in two phases, served as a unique exercise in product customization. In the first phase, CAE replaced the simulation servers, the software environment, and re-hosted the existing plant models. In the second phase, CAE replaced several of the existing thermal-hydraulics models to improve simulator fidelity. Throughout this project, CAE overcame a series of challenges stemming from project-specific requirements. In fact, the retention of the legacy software maintenance tools, the preservation of the instructor station package, and the interfacing with the existing hardware panel elements presented a number of opportunities for innovation. In the end, CAE overcame the challenges and acquired invaluable experience in doing so. (author)

  11. Emissions from coal-fired electric stations : environmental health effects and reduction options

    International Nuclear Information System (INIS)

    Love, P.; Lourie, B.; Pengelly, D.; Labatt, S.; Ogilvie, K.; Kelly, B.

    1998-01-01

    Findings of a study on the environmental effects of current emissions from coal-fired electric stations were summarized. Current and projected emissions from coal-fired electric stations for five emission reduction scenarios were estimated for Ontario, Eastern Canada, Ohio Valley/Great Lakes, and the U.S. northeast regions. Coal-fired electric stations generate a wide range of environmentally significant air emissions. The five pollutants selected - sulphur dioxide, nitrogen oxides, particulate matter (less than 10 micrometres in size), mercury, and carbon dioxide - are considered to impact most on environmental health. This report focused on 312 coal-fired electric stations in the regions named above. They were selected based on the likelihood that long-range transport of the emissions from these coal-fired utilities would have an impact on human health and the environment. 55 refs., 10 tabs., 8 figs

  12. TERRAscope and CUBE project at Caltech

    Science.gov (United States)

    Kanamori, Hiroo; Hauksson, , Egill; Heaton, Tom

    The TERRAscope project of the California Institute of Technology began in 1988 and now has six very broadband seismic stations (PAS, GSC, PFO, SBC, ISA, and SVD) in southern California (Figure 1). The goal of TERRAscope is to provide high-quality broadband data needed for significant advances in both regional and global seismology. TERRAscope will replace the old Caltech seismographic network in southern California, which dates back to the 1920s. In many cases, new stations are deployed in cooperation with local institutions. The goal is to encourage involvement of both students and researchers in the operation of the stations and analysis of new data. The station PAS is a joint project between Caltech, the University of Southern California, the U.S. Geological Survey (USGS), and the Incorporated Research Institutions for Seismology (IRIS). The station SBC was deployed in cooperation with the University of California at Santa Barbara. The station PFO is operated jointly with the University of California at San Diego, and the station SVD was installed and is operated by the USGS. Except for SVD, all of the stations are equipped with a broadband Streckeisen STS-1 seismometer and Quanterra data logger with a 24-bit digitizer and a Kinemetrics FBA-23 strong-motion sensor. The station SVD has a Streckeisen STS-2 seismometer and a Guralp CMG-5 accelerograph. The project is funded mainly by grants from the L. K. Whittier Foundation and the Arco Foundation. In addition to the automatic dial-up data retrieving system called Caltech Gopher (adapted from the IRIS Gopher system) has been implemented. The Caltech Gopher receives mail from NEIC for teleseisms and the SCSN with origin time, location, and magnitude for regional events. The Gopher retrieves data from all six TERRAscope stations for these events. The TERRAscope data reside in an FTP anonymous account (seismo.gps.caltech.edu; password: “your e-mail address”) at the Caltech Seismological Laboratory, and are

  13. Indicators to assess the environmental performances of an innovative subway station : example of Noisy-Champs

    Science.gov (United States)

    Schertzer, D. J. M.; Charbonnier, L.; Versini, P. A.; Tchiguirinskaia, I.

    2017-12-01

    Noisy-Champs is a train station located in Noisy-le-Grand and Champs-sur-Marne, in the Paris urban area (France). Integrated into the Grand Paris Express project (huge development project to modernise the transport network around Paris), this station is going to be radically transformed and become a major hub. Designed by the architectural office Duthilleul, the new Noisy-Champs station aspires to be an example of an innovative and sustainable infrastructure. Its architectural precepts are indeed meant to improve its environmental performances, especially those related to storm water management, water consumption and users' thermal and hygrometric comfort. In order to assess and monitor these performances, objectives and associated indicators have been developed. They aim to be adapted for a specific infrastructure such as a public transport station. Analyses of pre-existing comfort simulations, blueprints and regulatory documents have led to identify the main issues for the Noisy-Champs station, focusing on its resilience to extreme events like droughts, heatwaves and heaxvy rainfalls. Both objectives and indicators have been proposed by studying the space-time variabilities of physical fluxes (heat, pollutants, radiation, wind and water) and passenger flows, and their interactions. Each indicator is linked to an environmental performance and has been determined after consultation of the different stakeholders involved in the rebuilding of the station. It results a monitoring program to assess the environmental performances of the station composed by both the indicators grid and their related objectives, and a measurement program detailing the nature and location of sensors, and the frequency of measurements.

  14. Project 57 Air Monitoring Report: October 1, 2013, through December 31, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Mizell, Steve A. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Reno, NV (United States); Shadel, Craig [Desert Research Inst. (DRI), Las Vegas, NV (United States); Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-02-01

    On April 24, 1957, the Atomic Energy Commission (AEC, now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley north east of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DoD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a nonnuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DoD. Various radiological surveys have been performed in the area and in 2007, the DOE expanded the demarked contamination area by posting signs 200 to 400 feet (60 to 120 meters) outside of the original fence. Plutonium in soil is thought to attach preferentially to smaller particles. Therefore, redistribution of soil particulates by wind (dust) is the mechanism most likely to transport plutonium beyond the boundary of the Project 57 contamination area. In 2011, DRI installed two instrumentation towers to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination was detectable in samples of airborne dust and characterize meteorological and environmental parameters that influence dust transport. Collected data also permits comparison of radiological conditions at the Project 57 monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Biweekly samples of airborne particulates are submitted for laboratory

  15. Integrated Hydrogeological Investigation on the Vulnerability of a Pumping Station at a Losing Stream

    Science.gov (United States)

    Ngueleu Kamangou, Stephane; Vogt, Tobias; Cirpka, Olaf

    2010-05-01

    River restoration usually includes alteration of the river channel morphology. Thereby the interaction between river and groundwater can be modified. For the design of a river restoration project - especially in the vicinity of a groundwater pumping well for drinking water production - this impact must be predicted. But a good prediction requires a proper understanding of the existing situation. Numerical models help to improve the strategy of a successful river restoration project. The main objective of this study was to investigate the vulnerability of a pumping station located at losing river in northeast Switzerland. Besides the effect that river restoration could create, a particular attention was placed on the effect of a beaver dam in a side channel close to the pumping station. Analysis of field measurements coupled with numerical modeling of the pumping station area improved the understanding of the interactions in the river corridor between the river, side channels and the alluvial aquifer.

  16. North Central Project: Environment act proposal

    International Nuclear Information System (INIS)

    1992-05-01

    Manitoba Hydro proposes to construct a power transmission and distribution line system to connect 12 northern Manitoba communities to the utility's central power grid. The purpose of this North Central Project (NCP) is to provide reliable and unrestricted electric service to remote communities now largely receiving limited diesel-generated power. The NCP is composed of a 138-kV transmission line running ca 350 km from the Kelsey Generating Station, ca 160 km of 25-kV distribution lines, new transformer stations at four communities, upgraded internal distribution systems within the communities, removal of existing diesel stations and restoration of the sites, modifications and additions to the Kelsey switchyard, and a communications system. The NCP is described in detail, including proposed line routes and transformer station locations, rationales for site and route selection, projected impacts on the environment and local societies, and consultations with the communities to be affected. Potential impacts are expected to be modest, with few unmitigable adverse impacts and a number of potentially significant positive benefits. Impact management measures are proposed to prevent or mitigate adverse effects and to create or enhance positive impacts such as local employment of native peoples. 49 figs., 1 tab

  17. SUPPORT OF GULF OF MEXICO HYDRATE RESEARCH CONSORTIUM: ACTIVITIES TO SUPPORT ESTABLISHMENT OF A SEA FLOOR MONITORING STATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Paul Higley; J. Robert Woolsey; Ralph Goodman; Vernon Asper; Boris Mizaikoff; Angela Davis

    2005-08-01

    data logger, (G) Sufficient energy supply and normal functioning of the pressure compensated battery even following recharge after the first deployment, (H) Survival of the acoustic modem following both deployments though it was found to have developed a slow leak through the transducer following the second deployment due, presumably, to deployment in excess of 300m beyond its rating. (2) Progress on the Sea Floor Probe: (A) The Sea Floor Probe and its delivery system, the Multipurpose sled have been completed, (B) The probe has been modified to penetrate the <1m blanket of hemipelagic ooze at the water/sea floor interface to provide the necessary coupling of the accelerometer with the denser underlying sediments, (C) The MPS has been adapted to serve as an energy source for both p- and s-wave studies at the station as well as to deploy the horizontal line arrays and the SFP. (3) Progress on the Electromagnetic Bubble Detector and Counter: (A) Components for the prototype have been assembled, including a dedicated microcomputer to control power, readout and logging of the data, all at an acceptable speed, (B) The prototype has been constructed and preliminary data collected, (C) The construction of the field system is underway. (4) Progress on the Acoustic Systems for Monitoring Gas Hydrates: (A) Video recordings of bubbles emitted from a seep in Mississippi Canyon have been made from a submersible dive and the bubbles analyzed with respect to their size, number, and rise rate. These measurements have been used to determine the parameters to build the system capable of measuring gas escaping at the site of the monitoring station, (B) Laboratory tests performed using the project prototype have produced a conductivity data set that is being used to refine parameters of the field model. (5) Progress on the Mid-Infrared Sensor for Continuous Methane Monitoring: (A) Preliminary designs of mounting pieces for electrical components of ''sphereIR'' have

  18. Factors Causing Delay of Modification Projects at Koeberg Nuclear Power Station

    International Nuclear Information System (INIS)

    Ntoyanto, S.

    2017-01-01

    Modification project delays could lead to: disrupting the maintenance shutdown (outage) projects' schedule, affecting electricity capacity of the national grid., possible load-shedding restricting electricity supply to domestic, commercial, and industrial consumers; and detrimental consequences to the country's economic activities. To address proficiency of a project manager by improving: Understanding of the organizational processes, High-level technical knowledge of a nuclear power plant technology

  19. The International Space Station (ISS) Education Accomplishments and Opportunities

    Science.gov (United States)

    Alleyne, Camille W.; Blue, Regina; Mayo, Susan

    2012-01-01

    The International Space Station (ISS) has the unique ability to capture the imaginations of both students and teachers worldwide and thus stands as an invaluable learning platform for the advancement of proficiency in research and development and education. The presence of humans on board ISS for the past ten years has provided a foundation for numerous educational activities aimed at capturing that interest and motivating study in the sciences, technology, engineering and mathematics (STEM) disciplines which will lead to an increase in quality of teachers, advancements in research and development, an increase in the global reputation for intellectual achievement, and an expanded ability to pursue unchartered avenues towards a brighter future. Over 41 million students around the world have participated in ISS-related activities since the year 2000. Projects such as the Amateur Radio on International Space Station (ARISS) and Earth Knowledge Acquired by Middle School Students (EarthKAM), among others, have allowed for global student, teacher, and public access to space through radio contacts with crewmembers and student image acquisition respectively. . With planned ISS operations at least until 2020, projects like the aforementioned and their accompanying educational materials will be available to enable increased STEM literacy around the world. Since the launch of the first ISS element, a wide range of student experiments and educational activities have been performed by each of the international partner agencies: National Aeronautics and Space Administration (NASA), Canadian Space Agency (CSA), European Space Agency (ESA), Japan Aerospace Exploration Agency (JAXA) and Russian Federal Space Agency (Roscosmos). Additionally, a number of non-participating countries, some under commercial agreements, have also participated in Station-related activities. Many of these programs still continue while others are being developed and added to the station crewmembers tasks

  20. Inspiring the Next Generation: The International Space Station Education Accomplishments

    Science.gov (United States)

    Alleyne, Camille W.; Hasbrook, Pete; Knowles, Carolyn; Chicoine, Ruth Ann; Miyagawa, Yayoi; Koyama, Masato; Savage, Nigel; Zell, Martin; Biryukova, Nataliya; Pinchuk, Vladimir; hide

    2014-01-01

    The International Space Station (ISS) has a unique ability to capture the imagination of both students and teachers worldwide. Since 2000, the presence of humans onboard ISS has provided a foundation for numerous educational activities aimed at capturing that interest and motivating study in the sciences, technology, engineering and mathematics (STEM). Over 43 million students around the world have participated in ISS-related educational activities. Projects such as YouTube Space Lab, Sally Ride Earth Knowledge-based Acquired by Middle Schools (EarthKAM), SPHERES (Synchronized Position Hold Engage and Reorient Experimental Satellites) Zero-Robotics, Tomatosphere, and MAI-75 events among others have allowed for global student, teacher and public access to space through student classroom investigations and real-time audio and video contacts with crewmembers. Educational activities are not limited to STEM but encompass all aspects of the human condition. This is well illustrated in the Uchu Renshi project, a chain poem initiated by an astronaut while in space and continued and completed by people on Earth. With ISS operations now extended to 2024, projects like these and their accompanying educational materials are available to more students around the world. From very early on in the program's history, students have been provided with a unique opportunity to get involved and participate in science and engineering projects. Many of these projects support inquiry-based learning that allows students to ask questions, develop hypothesis-derived experiments, obtain supporting evidence and identify solutions or explanations. This approach to learning is well-published as one of the most effective ways to inspire students to pursue careers in scientific and technology fields. Ever since the first space station element was launched, a wide range of student experiments and educational activities have been performed, both individually and collaboratively, by all the

  1. Contamination awareness at the Dresden Nuclear Power Station

    International Nuclear Information System (INIS)

    Pagel, D.J.; Rath, W.C.

    1986-01-01

    Dresden Nuclear Power Station, which is located ∼ 60 miles southwest of Chicago near Morris, Illinois, has been generating electricity since 1960. Owned by Commonwealth Edison, Dresden was the nation's first privately financed nuclear station. On its site are three boiling water reactors (BWRs). Due to the contamination potential inherent with a reactor, a contamination trending program was created at the station. Studies had indicated a rise in contamination events during refueling outages. Further increases were due to specific work projects such as hydrolyzing operations. The investigations suggested that contract personnel also increased the number of events. In 1983, a contamination awareness program was created. The 1984 contamination awareness program was comprised of the following: (1) a statistical review in which trended contamination events were discussed. (2) A demonstration of protective clothing removal by an individual making various mistakes. (3) Scenarios were developed for use in mock work areas. (4) Upper management involvement. Because of the 1984 program, favorable attention has been focused on Dresden from the US Nuclear Regulatory Commission and the Institute of Nuclear Power Operations

  2. Hinkley Point 'C' power station public inquiry: proof of evidence on plant parameters

    International Nuclear Information System (INIS)

    George, B.V.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom. The overall economics of a nuclear power station depends on many factors which are determined by the design; the effectiveness with which the station is constructed; and the performance of the plant. In this respect the most significant factors are: construction time; capital cost; availability of the plant to produce electricity, taking account of those outages due to either planned or unplanned shutdowns; net electrical power output; and the working life of the plant. In this evidence to the Inquiry, the basis for the values chosen as ''targets'' for these parameters in the design of the plant and the control of the project is set out. The adjustment of the parameters to make them suitable for economic appraisal is explained. The design and project management arrangements are described. (author)

  3. Assessment of the use of vanadium redox flow batteries for energy storage and fast charging of electric vehicles in gas stations

    International Nuclear Information System (INIS)

    Cunha, Álvaro; Brito, F.P.; Martins, Jorge; Rodrigues, Nuno; Monteiro, Vitor; Afonso, João L.; Ferreira, Paula

    2016-01-01

    A network of conveniently located fast charging stations is one of the possibilities to facilitate the adoption of Electric Vehicles (EVs). This paper assesses the use of fast charging stations for EVs in conjunction with VRFBs (Vanadium Redox Flow Batteries). These batteries are charged during low electricity demand periods and then supply electricity for the fast charging of EVs during day, thus implementing a power peak shaving process. Flow batteries have unique characteristics which make them especially attractive when compared with conventional batteries, such as their ability to decouple rated power from rated capacity, as well as their greater design flexibility and nearly unlimited life. Moreover, their liquid nature allows their installation inside deactivated underground gas tanks located at gas stations, enabling a smooth transition of gas stations' business model towards the emerging electric mobility paradigm. A project of a VRFB system to fast charge EVs taking advantage of existing gas stations infrastructures is presented. An energy and cost analysis of this concept is performed, which shows that, for the conditions tested, the project is technologically and economically viable, although being highly sensitive to the investment costs and to the electricity market conditions. - Highlights: • Assessment of Vanadium Redox Flow Battery use for EV fast charge in gas stations. • This novel system proposal allows power peak shaving and use of deactivated gas tanks. • Philosophy allows seamless business transition towards the Electric Mobility paradigm. • Project is technologically and economically viable, although with long payback times. • Future Cost cuts due to technology maturation will consolidate project attractiveness.

  4. Mission Analysis for LEO Microwave Power-Beaming Station in Orbital Launch of Microwave Lightcraft

    Science.gov (United States)

    Myrabo, L. N.; Dickenson, T.

    2005-01-01

    A detailed mission analysis study has been performed for a 1 km diameter, rechargeable satellite solar power station (SPS) designed to boost 20m diameter, 2400 kg Micr,oWave Lightcraft (MWLC) into low earth orbit (LEO) Positioned in a 476 km daily-repeating oi.bit, the 35 GHz microwave power station is configured like a spinning, thin-film bicycle wheel covered by 30% efficient sola cells on one side and billions of solid state microwave transmitter elements on the other, At the rim of this wheel are two superconducting magnets that can stor,e 2000 G.J of energy from the 320 MW, solar array over a period of several orbits. In preparation for launch, the entire station rotates to coarsely point at the Lightcraft, and then phases up using fine-pointing information sent from a beacon on-board the Lightcraft. Upon demand, the station transmits a 10 gigawatt microwave beam to lift the MWLC from the earth surface into LEO in a flight of several minutes duration. The mission analysis study was comprised of two parts: a) Power station assessment; and b) Analysis of MWLC dynamics during the ascent to orbit including the power-beaming relationships. The power station portion addressed eight critical issues: 1) Drag force vs. station orbital altitude; 2) Solar pressure force on the station; 3) Station orbital lifetime; 4) Feasibility of geo-magnetic re-boost; 5) Beta angle (i..e., sola1 alignment) and power station effective area relationship; 6) Power station percent time in sun vs, mission elapsed time; 7) Station beta angle vs.. charge time; 8) Stresses in station structures.. The launch dynamics portion examined four issues: 1) Ascent mission/trajecto1y profile; 2) MWLC/power-station mission geometry; 3) MWLC thrust angle vs. time; 4) Power station pitch rate during power beaming. Results indicate that approximately 0 58 N of drag force acts upon the station when rotated edge-on to project the minimum frontal area of 5000 sq m. An ion engine or perhaps an electrodynamic

  5. Aseismic design of the Heysham II Nuclear Power Station

    International Nuclear Information System (INIS)

    Day, J.W.

    1983-01-01

    A brief description of the seismic criteria established for use with the Steam Generating Heavy Water Reactor (SCHWR) and taken for the Heysham II Project is given. The qualification strategy adopted for Heysham II is described, and a brief overview is given of some of the more important design changes required for seismic purposes on that station

  6. Engineering of electrical systems of nuclear power stations for improved reliability

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Ramanathan, K.; Choudhary, N.N.

    1977-01-01

    Operational problems experienced in electrical systems/equipment of the Tarapur Atomic Power Station (TAPS) and the Rajasthan Atomic Power Station (RAPS) and their solutions are dealt in detail. This experience has led to new design concepts which are being introduced for improved reliability in design of the Madras Atomic Power Project (MAPP) and the Narora Atomic Power Project (NAPP). Saline pollution on switchyard equipments was the major problem of the TAPS due to its coastal location. Saline pollution resulted in flash over of insulators and failure of clamps. The problem was solved by suitable changes in insulators, conductors, transformers, switches and arranging portable live line washing of the switchyard equipment. In MAPP which is also located on coast, an indoor switchyard is built. NAPP is located in a seismic zone, therefore, all equipment is specified for appropriate seismic duty. Various other improvements are described. (M.G.B.)

  7. Pilot solar hybrid power station in rural area, Rompin, Pahang, Malaysia

    International Nuclear Information System (INIS)

    Iszuan Shah Syed Ismail; Azmi Omar; Hamdan Hassan

    2006-01-01

    Malaysia has considerable number of widely deployed small rural area. These hamlets are very much associated with Orang Asli residents. They get their source of energy by candle or kerosene light while some richer community can afford a generator set. The usual or normal system using solar as a source for electricity at rural area is standalone system for each house. As for this project, a pilot centralized solar power station will be the source of electricity to light up the fifteen houses at Kampung Denai, Rompin, Pahang, Malaysia. This system will be the first ever built for the orang asli settlement at Pahang. The objectives of this project are to design and install the solar power station at remote location and to develop standard design of stand-alone solar power station suitable for Malaysia. Orang Asli residents at Kampung Denai was chosen because there is a school for the Orang Asli children. Moreover, the remote communities are living in stratification, which makes electrical wiring easier. Furthermore, the remote area is far from the last transmission line and cumbersome to bring diesel through the rough and unpredictable land road. The main domestic energy is for residential purposes (e.g. small lighting unit, radio, television, video, etc). The generator capacity is 18.6 kW. The solar sizing was done both for the home and school appliances at Kampung Denai. The maximum demand measured was 4195.35 kW. The pilot centralized solar power station consists of 10 kW photovoltaic panels, 10 kW inverter, 150 kWh battery and other balance of system. A generator set with capacity of 12.5 kVA is installed for back up and during monsoon season. This paper will present status of the system, operational and maintenance issues, load profile of the solar power station and economics and system design of the whole system

  8. Energy-Saving Optimization of Water Supply Pumping Station Life Cycle Based on BIM Technology

    Science.gov (United States)

    Qun, Miao; Wang, Jiayuan; Liu, Chao

    2017-12-01

    In the urban water supply system, pump station is the main unit of energy consumption. In the background of pushing forward the informatization in China, using BIM technology in design, construction and operations of water supply pumping station, can break through the limitations of the traditional model and effectively achieve the goal of energy conservation and emissions reduction. This work researches the way to solve energy-saving optimization problems in the process of whole life cycle of water supply pumping station based on BIM technology, and put forward the feasible strategies of BIM application in order to realize the healthy and sustainable development goals by establishing the BIM model of water supply pumping station of Qingdao Guzhenkou water supply project.

  9. Problems of implementing a large contract abroad: the Cordoba nuclear power station

    International Nuclear Information System (INIS)

    Caruso, P.

    1984-01-01

    The building of Argentina's second nuclear power station proved to be a true test of project-management skills: the contract was to be a joint effort between an Italian and a Canadian company, to be implemented in a country thousands of miles away; the Argentinian government changed four times during the course of the project; and the local currency was always unstable and unpredictable. The various difficulties that arose, and how they were solved, are described, and the role of the project management is evaluated. (author)

  10. Impacts and societal benefits of research activities at Summit Station, Greenland

    Science.gov (United States)

    Hawley, R. L.; Burkhart, J. F.; Courville, Z.; Dibb, J. E.; Koenig, L.; Vaughn, B. H.

    2017-12-01

    Summit Station began as the site for the Greenland Ice Sheet Project 2 ice core in 1989. Since then, it has hosted both summer campaign science, and since 1997, year-round observations of atmospheric and cryospheric processes. The station has been continuously occupied since 2003. While most of the science activities at the station are supported by the US NSF Office of Polar Programs, the station also hosts many interagency and international investigations in physical glaciology, atmospheric chemistry, satellite validation, astrophysics and other disciplines. Summit is the only high elevation observatory north of the Arctic circle that can provide clean air or snow sites. The station is part of the INTER-ACT consortium of Arctic research stations with the main objective to identify, understand, predict and respond to diverse environmental changes, and part of the International Arctic Systems for Observing the Atmosphere (IASOA) that coordinates Arctic research activities and provides a networked, observations-based view of the Arctic. The Summit Station Science Summit, sponsored by NSF, assembled a multidisciplinary group of scientists to review Summit Station science, define the leading research questions for Summit, and make community-based recommendations for future science goals and governance for Summit. The impact of several on-going observation records was summarized in the report "Sustaining the Science Impact of Summit Station, Greenland," including the use of station data in weather forecasts and climate models. Observations made at the station as part of long-term, year-round research or during shorter summer-only campaign seasons contribute to several of the identified Social Benefit Areas (SBAs) outlined in the International Arctic Observations Assessment Framework published by the IDA Science and Technology Policy Institute and Sustaining Arctic Observing Networks as an outcome of the 2016 Arctic Science Ministerial. The SBAs supported by research

  11. Model predictive control system and method for integrated gasification combined cycle power generation

    Science.gov (United States)

    Kumar, Aditya; Shi, Ruijie; Kumar, Rajeeva; Dokucu, Mustafa

    2013-04-09

    Control system and method for controlling an integrated gasification combined cycle (IGCC) plant are provided. The system may include a controller coupled to a dynamic model of the plant to process a prediction of plant performance and determine a control strategy for the IGCC plant over a time horizon subject to plant constraints. The control strategy may include control functionality to meet a tracking objective and control functionality to meet an optimization objective. The control strategy may be configured to prioritize the tracking objective over the optimization objective based on a coordinate transformation, such as an orthogonal or quasi-orthogonal projection. A plurality of plant control knobs may be set in accordance with the control strategy to generate a sequence of coordinated multivariable control inputs to meet the tracking objective and the optimization objective subject to the prioritization resulting from the coordinate transformation.

  12. Practical design considerations for photovoltaic power station

    Science.gov (United States)

    Swanson, T. D.

    Aspects of photovoltaic (PV) technology are discussed along with generic PV design considerations, taking into account the resource sunlight, PV modules and their reliability, questions of PV system design, the support structure subsystem, and a power conditioning unit subsystem. A description is presented of two recent projects which demonstrate the translation of an idea into actual working PV systems. A privately financed project in Denton, Maryland, went on line in early December, 1982, and began providing power to the local utility grid. It represents the first intermediate size, grid-connected, privately financed power station in the U.S. Based on firm quotes, the actual cost of this system is about $13/W peak. The other project, called the PV Breeder, is an energy independent facility which utilizes solar power to make new solar cells. It is also the first large industrial structure completely powered by the sun.

  13. Texas Clean Energy Project: Decision Point Application, Section 2: Topical Report - Phase 1, February 2010-October 2013

    Energy Technology Data Exchange (ETDEWEB)

    Mattes, Karl

    2013-09-01

    Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the Project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) power plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO2) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) that will be cleaned and further treated so that at least 90 percent of the overall carbon entering the IGCC facility will be captured. The clean syngas will then be divided into two highhydrogen (H2) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the Project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and

  14. CIGEO: some reasons to trust the project soundness

    International Nuclear Information System (INIS)

    2013-07-01

    This article outlines why the SFEN believes in the soundness of the CIGEO project. It outlines four reasons for a favourable impression: all countries have chosen the geological deposit, the client (the ANDRA) is a public body, Cigeo is the result of a large collective effort, and the Cigeo project is permanently controlled and assessed by irrefutable bodies. Two benefits of geological deposit are outlined: it has a totally passive safety, and it allows wastes to be isolated from biosphere for many years. The Cigeo project is presented as sufficiently advanced and the industrial phase can now start. The article states that there is no impact on neighbouring populations, and that nuclear power stations avoid the important chemical pollution of fossil fuel power stations. Finally, the project is presented as being a strong factor of development for the region in terms of jobs

  15. Transwaal - economic district heat from the Beznau nuclear power station

    International Nuclear Information System (INIS)

    Schatzmann, G.

    1986-01-01

    Initial study phases of the Transwaal project for distribution of heat from the Beznau nuclear power station via pipe lines to Aare and Limmat valley regions in Switzerland are presented. 500 MW heat availability through heat exchangers providing forward flow water temperature of 120 0 C, pipe line network and pumping station aspects, and the system energy flow diagram, are described. Considerations based on specific energy requirements in the year 2000 including alternative schemes showed economic viability. Investment and consumer costs and savings compared with oil and gas heating are discussed. Heat supply is guaranteed well into the 21st century and avoids environmental disadvantages. (H.V.H.)

  16. Lessons learned while implementing a safety parameter display system at the Comanche Peak steam electric station

    International Nuclear Information System (INIS)

    Hagar, B.

    1987-01-01

    With the completion of site Verification and Validation tests, the Safety Parameter Display System (SPDS) will be fully operational at the Comanche Peak Steam Electric Station. Implementation of the SPDS, which began in 1982, included: modifying generic Safety Assessment System Software; developing site-specific displays and features; installing and integrating system equipment into the plant; modifying station heating, ventilation, and air conditioning systems to provide necessary cooling; installing an additional uninterruptible power supply system to provide necessary power; and training station personnel in the operation and use of the system. Lessons learned during this project can be discussed in terms of an ideal SPDS implementation project. Such a project would design and implement an SPDS for a plant that is already under construction or operating, and would progress through a sequence of activities that includes: (1) developing and documenting the system design bases, and including all major design influences; (2) developing a database description and system functional specifications to clarify specific system requirements; (3) developing detailed system hardware and software design specifications to fully describe the system, and to enable identification of necessary site design changes early in the project; (4) implementing the system design; (5) configuring and extensively testing the system prior to routine system operation; and (6) tuning the system after the completion of system installation. The ideal project would include future system users in design development and system testing, and would use Verification and Validation techniques throughout the project to ensure that each sequential step is appropriate and correct

  17. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  18. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  19. Civil engineering in nuclear power stations: design of the turbine building and nuclear auxiliary building

    International Nuclear Information System (INIS)

    Lacroix, R.

    1985-01-01

    After enumerating the specific features of civil engineering in nuclear power stations. One goes on to examine the principal deliberations undertaken with the aim of optimising projects for transition from the P4 to P'4 and then N4 generations of nuclear power stations. The courses of action decided with respect to the design of the machine room and auxiliary equipment building are described [fr

  20. Experience on environmental qualification of safety-related components for Darlington Nuclear Generating Station

    International Nuclear Information System (INIS)

    Yu, A.S.; Kukreti, B.M.

    1987-01-01

    The proliferation of Nuclear Power Plant safety concerns has lead to increasing attention over the Environmental Qualification (EQ) of Nuclear Power Plant Safety-Related Components to provide the assurance that the safety related equipment will meet their intended functions during normal operation and postulated accident conditions. The environmental qualification of these components is also a Licensing requirement for Darlington Nuclear Generating Station. This paper provides an overview of EQ and the experience of a pilot project, in the qualification of the Main Moderator System safety-related functions for the Darlington Nuclear Generating Station currently under construction. It addresses the various phases of qualification from the identification of the EQ Safety-Related Components List, definition of location specific service conditions (normal, adbnormal and accident), safety-related functions, Environmental Qualification Assessments and finally, an EQ system summary report for the Main Moderator System. The results of the pilot project are discussed and the methodology reviewed. The paper concludes that the EQ Program developed for Darlington Nuclear Generating Station, as applied to the qualification of the Main Moderator System, contained all the elements necessary in the qualification of safety-related equipment. The approach taken in the qualification of the Moderator safety-related equipment proves to provide a sound framework for the qualification of other safety-related components in the station

  1. Experience and development of on-line BWR surveillance system at Onagawa nuclear power station unit-1

    International Nuclear Information System (INIS)

    Kishi, A.; Chiba, K.; Kato, K.; Ebata, S.; Ando, Y.; Sakamoto, H.

    1986-01-01

    ONAGAWA nuclear power station Unit-1 (Tohoku Electric Power Co.) is a BWR-4 nuclear power station of 524 MW electric power which started commercial operation in June 1984. To attain high reliability and applicability for ONAGAWA-1, Tohoku Electric Power Co. and Toshiba started a Research and Development project on plant surveillance and diagnosis from April 1982. Main purposes of this project are to: (1) Develop an on-line surveillance system and acquire its operating experience at a commercial BWR, (2) Assist in plant operation and maintenance by data acquisition and analysis, (3) Develop a new technique for plant surveillance and diagnosis. An outline of the project, operating experience gained from the on-line surveillance system and an introduction to new diagnosis techniques are reported in this paper. (author)

  2. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  3. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  4. The application of human error prevention tool in Tianwan nuclear power station

    International Nuclear Information System (INIS)

    Qiao Zhiguo

    2013-01-01

    This paper mainly discusses the application and popularization of human error prevention tool in Tianwan nuclear power station, including the study on project implementation background, main contents and innovation, performance management, innovation practice and development, and performance of innovation application. (authors)

  5. Non-Coop Station History

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Station history documentation for stations outside the US Cooperative Observer network. Primarily National Weather Service stations assigned WBAN station IDs. Other...

  6. Recycling by coverting organic waste to fertilize at Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kubota, T.; Matsuoka, H.

    2008-01-01

    In order to cope with global- warming and Dioxin issue, we started the Project in which all kinds of organic wastes originated on site are fermented to organic fertilizer with the help of YM bacteria in 2001. And in 2006 our product was officially approved as fertilizer by regulatory body, and then we started to sell these fertilizers to farmers near-by. Among many power stations in Japan, Ikata Nuclear Power Station may be the first plant where organic wastes are totally reused as commercial-based fertilizer. (author)

  7. Lunar base thermoelectric power station study

    Science.gov (United States)

    Determan, William; Frye, Patrick; Mondt, Jack; Fleurial, Jean-Pierre; Johnson, Ken; Stapfer, G.; Brooks, Michael D.; Heshmatpour, Ben

    2006-01-01

    Under NASA's Project Prometheus, the Nuclear Systems Program, the Jet Propulsion Laboratory, Pratt & Whitney Rocketdyne, and Teledyne Energy Systems have teamed with a number of universities, under the Segmented Thermoelectric Multicouple Converter (STMC) program, to develop the next generation of advanced thermoelectric converters for space reactor power systems. Work on the STMC converter assembly has progressed to the point where the lower temperature stage of the segmented multicouple converter assembly is ready for laboratory testing and the upper stage materials have been identified and their properties are being characterized. One aspect of the program involves mission application studies to help define the potential benefits from the use of these STMC technologies for designated NASA missions such as the lunar base power station where kilowatts of power are required to maintain a permanent manned presence on the surface of the moon. A modular 50 kWe thermoelectric power station concept was developed to address a specific set of requirements developed for this mission. Previous lunar lander concepts had proposed the use of lunar regolith as in-situ radiation shielding material for a reactor power station with a one kilometer exclusion zone radius to minimize astronaut radiation dose rate levels. In the present concept, we will examine the benefits and requirements for a hermetically-sealed reactor thermoelectric power station module suspended within a man-made lunar surface cavity. The concept appears to maximize the shielding capabilities of the lunar regolith while minimizing its handling requirements. Both thermal and nuclear radiation levels from operation of the station, at its 100-m exclusion zone radius, were evaluated and found to be acceptable. Site preparation activities are reviewed and well as transport issues for this concept. The goal of the study was to review the entire life cycle of the unit to assess its technical problems and technology

  8. 47 CFR 80.107 - Service of private coast stations and marine-utility stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Service of private coast stations and marine...) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Operating Procedures-Land Stations § 80.107 Service of private coast stations and marine-utility stations. A...

  9. Yeager Airport Hydrogen Vehicle Test Project

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Williams [West Virginia University Research Corporation, Morgantown, WV (United States)

    2015-10-01

    The scope of this project was changed during the course of the project. Phase I of the project was designed to have the National Alternative Fuels Training Consortium (NAFTC), together with its partners, manage the Hydrogen Vehicle Test Project at the Yeager Airport in conjunction with the Central West Virginia Regional Airport Authority (CWVRAA) in coordination with the United States Department of Energy National Energy Technology Laboratory (U.S. DOE NETL). This program would allow testing and evaluation of the use of hydrogen vehicles in the state of West Virginia utilizing the hydrogen fueling station at Yeager Airport. The NAFTC and CWVRAA to raise awareness and foster a greater understanding of hydrogen fuel and hydrogen-powered vehicles through a targeted utilization and outreach and education effort. After initial implementation of the project, the project added, determine the source(s) of supply for hydrogen powered vehicles that could be used for the testing. After completion of this, testing was begun at Yeager Airport. During the course of the project, the station at Yeager Airport was closed and moved to Morgantown and the West Virginia University Research Corporation. The vehicles were then moved to Morgantown and a vehicle owned by the CWVRAA was purchased to complete the project at the new location. Because of a number of issues detailed in the report for DE-FE0002994 and in this report, this project did not get to evaluate the effectiveness of the vehicles as planned.

  10. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  11. SALCER´s Project

    Directory of Open Access Journals (Sweden)

    Carlos Pérez

    2009-12-01

    Full Text Available SALCER (in Spanish: Sistema de Asesoramiento y Localización de Centrales de EnergíaRenovables could be translated as Counseling and Location of Renewable Energy Power Station´s System. Its objective is to develop a system capable of finding the most suitable place for the construction of renewable power stations, taking into account such things as: budget, topography, amount of energy needed, among others. The most relevant aims of the project are: study of a certain variety of renewable energy technologies, designing an accurate topology system, restraining decisions to demand forecasts and finally performance of an energy plan for a specific region

  12. 47 CFR 73.6016 - Digital Class A TV station protection of TV broadcast stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital Class A TV station protection of TV... Class A TV station protection of TV broadcast stations. Digital Class A TV stations must protect authorized TV broadcast stations, applications for minor changes in authorized TV broadcast stations filed on...

  13. Economics of biofiltration for remediation projects

    International Nuclear Information System (INIS)

    Yudelson, J.M.; Tinari, P.D.

    1995-01-01

    Biofilters with granular activated carbon (GAC) filter backup units offer substantial savings compared to conventional GAC filters and catalytic/thermal oxidation (Catox) units in controlling emissions of volatile organic compounds (VOCs) from petroleum remediation projects. Provided that the biofilter supplier is willing to satisfy the client's and consultant's risk-management concerns, biofilters offer anew method for reducing the cost of remediation projects, with savings of up to $10,000 (24%) per facility in 24-month projects and up to $16,000 (32%) per facility in 36-month projects for simple gas station remediation projects. Savings will be greater for longer projects and projects with higher average contaminant loadings

  14. Fire Stations

    Data.gov (United States)

    Department of Homeland Security — Fire Stations in the United States Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their...

  15. Do cities deserve more railway stations? The choice of a departure railway station in a multiple-station region

    NARCIS (Netherlands)

    Givoni, M.; Rietveld, P.

    2014-01-01

    Promoting the use of rail is an important element in sustainable transport policy. One of the most important decisions to make in planning the railway network is on the number of stations to provide. Stations are the access points to rail services and while each additional station increases rail's

  16. 47 CFR 73.6018 - Digital Class A TV station protection of DTV stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital Class A TV station protection of DTV... TV station protection of DTV stations. Digital Class A TV stations must protect the DTV service that... application for digital operation of an existing Class A TV station or to change the facilities of a digital...

  17. POLLUTION PREVENTION OPPORTUNITY ASSESSMENT - UNITED STATES NAVAL BASE NORFOLK NAVAL AIR STATION

    Science.gov (United States)

    This report summarizes work conducted at the U.S. Navy's Naval Base Norfolk, Naval Air Station (NAS) located at Sewells Point in Norfolk, Virginia, under the U.S. Environmental Protection Agency's (EPA) Waste Reduction Evaluations at Federal Sites (WREAFS) Program. This project w...

  18. Linux toys II 9 Cool New Projects for Home, Office, and Entertainment

    CERN Document Server

    Negus, Christopher

    2006-01-01

    Builds on the success of the original Linux Toys (0-7645-2508-5) and adds projects using different Linux distributionsAll-new toys in this edition include a car computer system with built-in entertainment and navigation features, bootable movies, a home surveillance monitor, a LEGO Mindstorms robot, and a weather mapping stationIntroduces small business opportunities with an Internet radio station and Internet caf ̌projectsCompanion Web site features specialized hardware drivers, software interfaces, music and game software, project descriptions, and discussion forumsIncludes a CD-ROM with scr

  19. The Current Status of the Space Station Biological Research Project: a Core Facility Enabling Multi-Generational Studies under Slectable Gravity Levels

    Science.gov (United States)

    Santos, O.

    2002-01-01

    The Space Station Biological Research Project (SSBRP) has developed a new plan which greatly reduces the development costs required to complete the facility. This new plan retains core capabilities while allowing for future growth. The most important piece of equipment required for quality biological research, the 2.5 meter diameter centrifuge capable of accommodating research specimen habitats at simulated gravity levels ranging from microgravity to 2.0 g, is being developed by NASDA, the Japanese space agency, for the SSBRP. This is scheduled for flight to the ISS in 2007. The project is also developing a multi-purpose incubator, an automated cell culture unit, and two microgravity habitat holding racks, currently scheduled for launch in 2005. In addition the Canadian Space Agency is developing for the project an insect habitat, which houses Drosophila melanogaster, and provides an internal centrifuge for 1 g controls. NASDA is also developing for the project a glovebox for the contained manipulation and analysis of biological specimens, scheduled for launch in 2006. This core facility will allow for experimentation on small plants (Arabidopsis species), nematode worms (C. elegans), fruit flies (Drosophila melanogaster), and a variety of microorganisms, bacteria, yeast, and mammalian cells. We propose a plan for early utilization which focuses on surveys of changes in gene expression and protein structure due to the space flight environment. In the future, the project is looking to continue development of a rodent habitat and a plant habitat that can be accommodated on the 2.5 meter centrifuge. By utilizing the early phases of the ISS to broadly answer what changes occur at the genetic and protein level of cells and organisms exposed to the ISS low earth orbit environment, we can generate interest for future experiments when the ISS capabilities allow for direct manipulation and intervention of experiments. The ISS continues to hold promise for high quality, long

  20. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    McFarlane, J.D.

    1982-11-01

    The NNC construction programme for the Sizewell B nuclear power station is outlined. The following topics are considered: constructability aspects of the Sizewell B design; overall project programme and organization; NNC target construction programme; construction planning; material quantities and installation rates; site construction manpowers; construction contracting policy; site industrial relations and productivity; site management. (U.K.)

  1. Contaminants and nutrients in variable sea areas (Canvas). Application of automatic monitoring stations in the German marine environment

    International Nuclear Information System (INIS)

    Nies, H.; Bruegge, B.; Sterzenbach, D.; Knauth, H.D.; Schroeder, F.

    1999-01-01

    Permanent observation of parameters at sea stations can only be obtained by automatic sampling. The MERMAID technique developed in former projects provides a possibility to run automatic stations within the German MARNET measuring stations to obtain data on nutrients concentration on line and to collect organic micropollutants and the radionuclide 137 Cs by solid phase extraction from seawater and subsequent analysis in the laboratory. The BSH MARNET consists of ten stations located in the German Bight sector of the North Sea and the western Baltic. First results from the time series of nutrient and organic micropollutant concentrations has been presented

  2. SYNCHEM feasibility report: Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-01

    Several Czech and US companies have entered into a development agreement for the purposes of determining the technical and economic feasibility and overall financeability of an integrated gasification combined cycle (IGCC) regional energy facility to be located adjacent to the Chemopetrol refinery in Litvinov, Czech Republic. The Project would use a feedstock comprised of coal supplied by Doly a upravny Komorany s.p. (DUK) coal mining company and mined from the Most/Litvinov area together with high sulfur residual oils from the Chemopetrol refinery. When gasified together with oxygen from an Air Products air separation plant, and based on an average yearly consumption of 2,100K metric tons per year of coal (as delivered) and 630K tonnes per year of oil, approximately 11 million normal cubic meters per day of syngas will be produced. At its current projected design capacity, when combusted in two General Electric advanced technology Frame 9FA gas turbines, the Project will produce approximately 690MW of electric power; 250 metric tons/hour of steam for process; and 135 thermal equivalent MW of district heat. The Feasibility Phase efforts described in this report indicate the real possibility for a successful and profitable IGCC Project for the Czech Republic. It is therefore incumbent upon all the Project Participants to review and evaluate the information contained herein such that a go/no-go decision can be reached by early next year.

  3. The air quality and health co-benefits of alternative post-2020 pathways for achieving peak carbon targets in Jiangsu, China

    Science.gov (United States)

    Liu, M.; Bi, J.; Huang, Y.; Kinney, P. L.

    2016-12-01

    Jiangsu, which has three national low-carbon pilot cities, is set to be a model province in China for achieving peak carbon targets before 2030. However, according to local planning of responding to climate change, carbon emissions are projected to keep going up before 2020 even the strictest measures are implemented. In other words, innovative measures must be in action after 2020. This work aimed at assessing the air quality and health co-benefits of alternative post-2020 measures to help remove barriers of policy implementation through tying it to local incentives for air quality improvement. To achieve the aim, we select 2010 as baseline year and develop Bussiness As Usual (BAU) and Traditional Carbon Reduction (TCR) scenarios before 2020. Under BAU, only existing climate and air pollution control policies are considered; under TCR, potential climate policies in local planning and existing air pollution control policies are considered. After 2020, integrated gasification combined cycle (IGCC) plant with carbon capture and storage (CCS) technology and large-scale substitution of renewable energy seem to be two promising pathways for achieving peak carbon targets. Therefore, two additional scenarios (TCR-IGCC and TCR-SRE) are set after 2020. Based on the projections of future energy balances and industrial productions, we estimate the pollutant emissions and simulate PM2.5 and ozone concentrations by 2017, 2020, 2030 and 2050 using CMAQ. Then using health impact assessment approach, the premature deaths are estimated and monetized. Results show that the carbon peak in Jiangsu will be achieved before 2030 only under TCR-IGCC and TCR-SRE scenarios. Under three policy scenarios, Jiangsu's carbon emission control targets would have substantial effects on primary air pollutant emissions far beyond those we estimate would be needed to meet the PM2.5 concentration targets in 2017. Compared with IGCC with CCS, large-scale substitutions of renewable energy bring

  4. A study of space station needs, attributes and architectural options, volume 2, technical. Book 3: Economic benefits, costs and programmatics

    Science.gov (United States)

    1983-01-01

    The economic benefits, cost analysis, and industrial uses of the manned space station are investigated. Mission payload costs are examined in relation to alternative architectures and projected technological evolution. Various approaches to industrial involvement for financing, development, and marketing of space station resources are described.

  5. Mini hydro electric power stations Lukar 1,2,3,4: Public enterprise (JP) Komunalec

    International Nuclear Information System (INIS)

    Stojanova, Blagica

    2004-01-01

    The role of the Public enterprises in improving entire living conditions of the citizens, not only by its services towards the citizenship such as: water supplying and public hygiene but the opportunity to produce the electric power by the Mini hydro electric-power stations built on the main city water supply pipes. The paper presents experiences of building the mini hydro electric power stations Lukar 1,2,3,4. The successful completion of this project should be a motivation for building more electric power stations because there are great water potential in the Republic of Macedonia i.e. there have been recorded more than a hundred places suitable for construction of power electric stations. This will contribute not only for clean ecological energy but will have a direct influence on the total economic development of the Republic of Macedonia. (Author)

  6. LambdaStation: Exploiting Advance Networks In Data Intensive High Energy Physics Applications

    Energy Technology Data Exchange (ETDEWEB)

    Harvey B. Newman

    2009-09-11

    Lambda Station software implements selective, dynamic, secure path control between local storage & analysis facilities, and high bandwidth, wide-area networks (WANs). It is intended to facilitate use of desirable, alternate wide area network paths which may only be intermittently available, or subject to policies that restrict usage to specified traffic. Lambda Station clients gain awareness of potential alternate network paths via Clarens-based web services, including path characteristics such as bandwidth and availability. If alternate path setup is requested and granted, Lambda Station will configure the local network infrastructure to properly forward designated data flows via the alternate path. A fully functional implementation of Lambda Station, capable of dynamic alternate WAN path setup and teardown, has been successfully developed. A limited Lambda Station-awareness capability within the Storage Resource Manager (SRM) product has been developed. Lambda Station has been successfully tested in a number of venues, including Super Computing 2008. LambdaStation software, developed by the Fermilab team, enables dynamic allocation of alternate network paths for high impact traffic and to forward designated flows across LAN. It negotiates with reservation and provisioning systems of WAN control planes, be it based on SONET channels, demand tunnels, or dynamic circuit networks. It creates End-To-End circuit between single hosts, computer farms or networks with predictable performance characteristics, preserving QoS if supported in LAN and WAN and tied security policy allowing only specific traffic to be forwarded or received through created path. Lambda Station project also explores Network Awareness capabilities.

  7. Joint optimization scheduling for water conservancy projects in complex river networks

    Directory of Open Access Journals (Sweden)

    Qin Liu

    2017-01-01

    Full Text Available In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.

  8. Etan hydropower project spurs industrial, agricultural growth of region

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Located in Hongdu commune, Xincheng County, Guangxi Zhuang Autonomous Region, on the middle reaches of the Hongshui River, the Etan hydroelectric power station was begun in 1977 and began to generate power in April 1981. The Etan hydroelectric power station is a run-off type, low waterhead medium-sized power station. It has an installed capacity of 60,000 kW for an average yearly power output of 328 million kWh. The main structure of the power station includes a water diversion canal, a water intake gate, a main machinery building and a switching station. The main machinery building is located on the downstream side of the dam on an overhanging cliff. With a construction area of only 5000 m/sup 2/, work was very difficult due to the restricted work area and transportation problems. By strengthening construction management and promoting technical innovation some 670,000 yuan were saved for the state and construction time was accelerated. This assured the completion of the construction and installation of the main parts of the project according to timetables and design requirements. The successful construction of the Etan hydroelectric power station marks another step in amassing experience in the harnessing of the Hongshui River. The project will have a major impact on the growth of industry and agriculture in Guangxi and on the buildup of the minority regions.

  9. Estimating Pedestrian flows at train stations using the Station Transfer Model

    NARCIS (Netherlands)

    Van den Heuvel, J.P.A.; Dekkers, K.; De Vos, S.

    2012-01-01

    Train stations play a vital role in the door to door travel experience of train passengers. From the passengers’ value of time perspective, the station is the weakest link in total time value of the journey. Within the station the transfer function – moving between the various transport modes and

  10. Broadcasting Stations of the World; Part III. Frequency Modulation Broadcasting Stations.

    Science.gov (United States)

    Foreign Broadcast Information Service, Washington, DC.

    This third part of "Broadcasting Stations of the World", which lists all reported radio broadcasting and television stations, with the exception of those in the United States which broadcast on domestic channels, covers frequency modulation broadcasting stations. It contains two sections: one indexed alphabetically by country and city, and the…

  11. Potential human factors deficiencies in the design of local control stations and operator interfaces in nuclear power plants

    International Nuclear Information System (INIS)

    Hartley, C.S.; Levy, I.S.; Fecht, B.A.

    1984-04-01

    The Pacific Northwest Laboratory has completed a project to identify human factors deficiencies in safety-significant control stations outside the control room of a nuclear power plant and to determine whether NUREG-0700, Guidelines for Control Room Design Reviews, would be sufficient for reviewing those local control stations (LCSs). The project accomplished this task by first, reviewing existing data pertaining to human factors deficiencies in LCSs involved in significant safety actions; second, surveying LCSs environments and design features at several operating nuclear power plants; and third, assessing the results of that survey relative to the contents of NUREG-0700

  12. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1995

    International Nuclear Information System (INIS)

    1996-06-01

    This report is the Atomic Energy Control Board (AECB) staff assessment of safety at the Pickering Nuclear Generating Station (PNGS-A and PNGS-B) for 1995. Our on-site Project Officers and Ottawa-based specialists monitored the stations throughout the year. In 1995, compliance with the Transportation Packaging of Radioactive Materials Regulations and the Cost Recovery Fees Regulations was satisfactory. The performance of the special safety systems was good. Releases of radioactive materials from the station were low and well below the legal limits for public safety. 10 tabs., 7 figs

  13. Aspects of safety and of functional construction and configuration in planning and designing nuclear heating stations

    International Nuclear Information System (INIS)

    Adam, E.; Mueller, R.; Boettger, M.; Kremtz, U.

    1982-01-01

    The present studies are based on the design of a technological project of a nuclear heating station with a unit power of 250 MW. Essentially, this nuclear heating station is a three-circuit plant, the primary coolant circuit being based on natural circulation through the reactor vessel with integrated heat exchangers. Starting from the social objective and the derived development structure of the territory, the siting problems in integrating the nuclear heating stations have to be solved. On the basis of the resulting dimensions of the containment the technical and economical specifications of different versions of containment design are evaluated. (author)

  14. Guidelines for Learning Stations.

    Science.gov (United States)

    Fehrle, Carl C.; Schulz, Jolene

    Guidelines for designing and planning learning stations for pupils at the elementary grade level include suggestions on how to develop a station that will be successful in meeting the learners' needs. Instructions for the use of tapes at a station and matching pupils with stations are given, as are guidelines on classroom arrangement and record…

  15. Plant habitability assessment for Point Lepreau Generating Station during a severe accident resulting from station blackout conditions

    International Nuclear Information System (INIS)

    Mullin, D.

    2015-01-01

    In response to the CNSC Fukushima Action Plan, the CANDU Owners Group (COG) developed a methodology for assessing nuclear power plant habitability under Joint Project 4426 and to determine if any improvement actions are necessary to provide a high degree of assurance that a severe accident can be managed from a human and organizational performance perspective. NB Power has applied the methodology considering a station black-out scenario (representative case), and assessed the effects of non-radiological hazards and radiological hazards in the context of operator dose relative to emergency dose limits. The paper will discuss the overall methodology, findings and recommendations. (author)

  16. Plant habitability assessment for Point Lepreau Generating Station during a severe accident resulting from station blackout conditions

    Energy Technology Data Exchange (ETDEWEB)

    Mullin, D., E-mail: dmullin@nbpower.com [New Brunswick Power Corporation, Point Lepreau Generating Station, Lepreau, NB (Canada)

    2015-07-01

    In response to the CNSC Fukushima Action Plan, the CANDU Owners Group (COG) developed a methodology for assessing nuclear power plant habitability under Joint Project 4426 and to determine if any improvement actions are necessary to provide a high degree of assurance that a severe accident can be managed from a human and organizational performance perspective. NB Power has applied the methodology considering a station black-out scenario (representative case), and assessed the effects of non-radiological hazards and radiological hazards in the context of operator dose relative to emergency dose limits. The paper will discuss the overall methodology, findings and recommendations. (author)

  17. Optimization of municipal pressure pumping station layout and sewage pipe network design

    Science.gov (United States)

    Tian, Jiandong; Cheng, Jilin; Gong, Yi

    2018-03-01

    Accelerated urbanization places extraordinary demands on sewer networks; thus optimization research to improve the design of these systems has practical significance. In this article, a subsystem nonlinear programming model is developed to optimize pumping station layout and sewage pipe network design. The subsystem model is expanded into a large-scale complex nonlinear programming system model to find the minimum total annual cost of the pumping station and network of all pipe segments. A comparative analysis is conducted using the sewage network in Taizhou City, China, as an example. The proposed method demonstrated that significant cost savings could have been realized if the studied system had been optimized using the techniques described in this article. Therefore, the method has practical value for optimizing urban sewage projects and provides a reference for theoretical research on optimization of urban drainage pumping station layouts.

  18. Experimental study on hydraulic characteristic around trash rack of a pumping station

    Science.gov (United States)

    Zhou, MinZhe; Li, TongChun; Lin, XiangYang; Liu, XiaoQing; Ding, Yuan; Liu, GuangYuan

    2017-11-01

    This paper focuses on flow pattern around trash rack of intake of a pumping station project. This pumping station undertake the task of supplying up to 3,500,000 m3 water per day for a megacity. Considering the large flow rate, high lift, multi-pipe supply and long-time operation in this water conveyance pumping station, we built a physical model test to measure the flow velocity and observe the flow pattern to verify the reasonability of preliminary design. In this test, we set 3 layers of current meters around each trash rack of intake in reservoir to collect the flow velocity. Furthermore, we design 2 operating conditions of 9 pumps to observe the change of flow pattern. Finally, we found the velocity data were in a normal range under 2 different operating conditions of the 9 pump units.

  19. 47 CFR 95.139 - Adding a small base station or a small control station.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Adding a small base station or a small control... base station or a small control station. (a) Except for a GMRS system licensed to a non-individual, one or more small base stations or a small control station may be added to a GMRS system at any point...

  20. Balbina's region sustainable development project

    International Nuclear Information System (INIS)

    Hargreaves, Paul

    1994-01-01

    This work presents a planning and administration of an environmental project proposal for Balbina's lake hydroelectric power station restoration. The socio-economic objectives are the hydro-forest bio production development which include fishery, specialized tourism, leisure, besides the processing of industrial raw materials

  1. TECHNICAL AND ECONOMICAL COMPARISON OF OVERFLOW DAM VARIANTS AT THE GRODNO WATER-POWER STATION

    Directory of Open Access Journals (Sweden)

    G. G. Krouglov

    2005-01-01

    Full Text Available The paper considers various aspects pertaining to determination of main technical characteristics of water-development projects of water-power stations. Technical and economical characteristics of overflow dams at the Grodno water-power station are compared in the paper.The paper contains results of model investigations of two-tier overflow dam which is included in composition of the Grodno water-power station and presents methodology for calculation of pool integration behind two-tier dam which has been developed at the water-development and power engineering department. This methodology makes it possible to determine rate coefficient and compressed depth. In addition to this the paper gives technical and economical comparison of various designs of overflow dams at the Grodno water-power station, analyzes their cost and on the basis of this comparative analysis it is recommended to construct a two-pier dam. 

  2. Microwave energy transmission test toward the SPS using the space station

    Energy Technology Data Exchange (ETDEWEB)

    Kaya, N.; Matsumoto, H.; Miyatake, S.; Kimura, I.; Nagatomo, M.

    1986-12-01

    An outline of a project METT (Microwave Energy Transmission Test) using the Space Station is described. The objectives of the METT are to develop and test the technology of microwave energy transmission for the future Solar Power Satellite (SPS), and to estimate the environmental effects of the high power microwaves on the ionosphere and the atmosphere. Energy generated with solar cells is transmitted from a transmitting antenna on the bus platform near the Space Station to a rectenna on the sub-satellite or the ground station in order to test the total efficiency and the functions of the developed system of the energy transmission. Plasma similar to that in the D and E layers in the ionosphere is produced in a large balloon opened on the sub-satellite in order to investigate possible interactions between the SPS microwave and the ionospheric plasma and to determine the maximum power density of the microwave beam which passes through the ionosphere.

  3. Synthetic fuels development in Kentucky: Four scenarios for an energy future as constructed from lessons of the past

    Science.gov (United States)

    Musulin, Mike, II

    The continued failure of synthetic fuels development in the United States to achieve commercialization has been documented through the sporadic periods of mounting corporate and government enthusiasm and high levels of research and development efforts. Four periods of enthusiasm at the national level were followed by waning intervals of shrinking financial support and sagging R&D work. The continuing cycle of mobilization and stagnation has had a corresponding history in Kentucky. To better understand the potential and the pitfalls of this type of technological development the history of synthetic fuels development in the United States is presented as background, with a more detailed analysis of synfuels development in Kentucky. The first two periods of interest in synthetic fuels immediately after the Second World War and in the 1950s did not result in any proposed plants for Kentucky, but the third and fourth periods of interest created a great deal of activity. A theoretically grounded case study is utilized in this research project to create four different scenarios for the future of synthetic fuels development. The Kentucky experience is utilized in this case study because a fifth incarnation of synthetic fuels development has been proposed for the state in the form of an integrated gasification combined cycle power plant (IGCC) to utilize coal and refuse derived fuel (RDF). The project has been awarded a grant from the U.S. Department of Energy Clean Coal Technology program. From an examination and analysis of these periods of interest and the subsequent dwindling of interest and participation, four alternative scenarios are constructed. A synfuels breakthrough scenario is described whereby IGCC becomes a viable part of the country's energy future. A multiplex scenario describes how IGCC becomes a particular niche in energy production. The status quo scenario describes how the old patterns of project failure repeat themselves. The fourth scenario describes

  4. Sustainable Mining Land Use for Lignite Based Energy Projects

    Science.gov (United States)

    Dudek, Michal; Krysa, Zbigniew

    2017-12-01

    This research aims to discuss complex lignite based energy projects economic viability and its impact on sustainable land use with respect to project risk and uncertainty, economics, optimisation (e.g. Lerchs and Grossmann) and importance of lignite as fuel that may be expressed in situ as deposit of energy. Sensitivity analysis and simulation consist of estimated variable land acquisition costs, geostatistics, 3D deposit block modelling, electricity price considered as project product price, power station efficiency and power station lignite processing unit cost, CO2 allowance costs, mining unit cost and also lignite availability treated as lignite reserves kriging estimation error. Investigated parameters have nonlinear influence on results so that economically viable amount of lignite in optimal pit varies having also nonlinear impact on land area required for mining operation.

  5. Hydrocarbon impacts and remedial action at an active service station

    Energy Technology Data Exchange (ETDEWEB)

    Haidar, S.A. [Keystone Environmental, Burnaby, BC (Canada); Linke, J. [Chevron Canada Ltd., Vancouver, BC (Canada)

    2006-07-01

    This presentation discussed a project that examined the hydrocarbon impacts and remedial action at an active service station. The presentation identified the project partners, discussed the background on the project and project goals. Chevron Canada was the site involved in the study and Keystone Environmental was responsible for testing soil samples, developing the detailed conceptual site model, and for conducting indoor air quality monitoring. The presentation also provided illustrations of the site layout, investigated areas, and soil and groundwater plume. The evaluation and selection of remedial options were also discussed as well as other project planning activities such as assembling the project team, obtaining agreement with stakeholders, and coordinating with the municipality, utility companies, residents, and neighbours. Remediation efforts that were described and illustrated in the presentation included: underpinning and shoring; excavation; and, barrier wall installation. Last, post remediation activities were identified including the installation of post remediation confirmatory wells; reinstating structures; reinstating rear yards, fences, and garages; reconnecting utilities; performance monitoring of barrier wall; and, preparing closure reports for certificates of compliance on off-site properties. 6 figs.

  6. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  7. Developments of space station; Uchu station no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Hashimoto, H. [National Space Development Agency of Japan, Tokyo (Japan)

    1996-03-05

    This paper introduces the Japanese experiment module (JEM) in developing a space station. The JEM consists of systems of a pressurizing section, an exposure section, a pressurizing portion of a supply section, a manipulator and an exposure portion of the supply section. The pressurizing section circulates and controls air so that crews can perform experiments under pressurized environment. The exposure section is a part in which experiments are carried out under exposure environment. The supply section runs between a station and the ground, with required devices loaded on it. The manipulator performs attaching a payload for the exposure section and replaces experimental samples. The JEM undergoes a schedule of fabricating an engineering model, testing for a certification a prototype flight model, and putting the model on a flight. The pressurizing section, exposure section and manipulator are at the stage of system tests. Surveillance of the JEM and control of the experiments are carried out at the Tsukuba Space Center. The Center is composed of a space experiment building, a zero-gravity environment testing building, an astronaut training building, a space station operating building, and a space station testing building. 7 figs., 2 tabs.

  8. Mobile phone base stations-Effects on wellbeing and health.

    Science.gov (United States)

    Kundi, Michael; Hutter, Hans-Peter

    2009-08-01

    Studying effects of mobile phone base station signals on health have been discouraged by authoritative bodies like WHO International EMF Project and COST 281. WHO recommended studies around base stations in 2003 but again stated in 2006 that studies on cancer in relation to base station exposure are of low priority. As a result only few investigations of effects of base station exposure on health and wellbeing exist. Cross-sectional investigations of subjective health as a function of distance or measured field strength, despite differences in methods and robustness of study design, found indications for an effect of exposure that is likely independent of concerns and attributions. Experimental studies applying short-term exposure to base station signals gave various results, but there is weak evidence that UMTS and to a lesser degree GSM signals reduce wellbeing in persons that report to be sensitive to such exposures. Two ecological studies of cancer in the vicinity of base stations report both a strong increase of incidence within a radius of 350 and 400m respectively. Due to the limitations inherent in this design no firm conclusions can be drawn, but the results underline the urgent need for a comprehensive investigation of this issue. Animal and in vitro studies are inconclusive to date. An increased incidence of DMBA induced mammary tumors in rats at a SAR of 1.4W/kg in one experiment could not be replicated in a second trial. Indications of oxidative stress after low-level in vivo exposure of rats could not be supported by in vitro studies of human fibroblasts and glioblastoma cells. From available evidence it is impossible to delineate a threshold below which no effect occurs, however, given the fact that studies reporting low exposure were invariably negative it is suggested that power densities around 0.5-1mW/m(2) must be exceeded in order to observe an effect. The meager data base must be extended in the coming years. The difficulties of investigating

  9. Snubber reduction program at the Byron Station, Unit 1

    International Nuclear Information System (INIS)

    Arterburn, J.; Bakhtiari, S.

    1987-01-01

    Commonwealth Edison Company's (CECo's) Byron Station, unit 1, was originally designed with approximately 1200 snubbers supporting the plant's large- and small-bore piping systems. This relatively large number of snubbers is attributed to excessive conservatism in nuclear piping codes and regulations effective during the original piping design. A recent pilot program at CECo's LaSalle County Station, a boiling water reactor plant, demonstrated that a 50% or greater reduction in total snubber population is achievable in plants of this design vintage. Based on the successful results of the pilot program, CECo initiated a full scale snubber reduction program at Byron, a pressurized water reactor plant of the same vintage at the LaSalle County Station. The benefits from a reduced snubber population are described. To realize the maximum potential benefits, all snubbers in the plant were prioritized in order of desirability for removal. The priority designations are discussed. The major results from phase 1 of the Byron program are summarized. The NRC inspection of the project addressed a variety of issues and is discussed. The conclusions that can be drawn from the phase 1 program are summarized

  10. Advanced Life Support Project Plan

    Science.gov (United States)

    2002-01-01

    Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.

  11. Analysis Methodology for Optimal Selection of Ground Station Site in Space Missions

    Science.gov (United States)

    Nieves-Chinchilla, J.; Farjas, M.; Martínez, R.

    2013-12-01

    Optimization of ground station sites is especially important in complex missions that include several small satellites (clusters or constellations) such as the QB50 project, where one ground station would be able to track several spatial vehicles, even simultaneously. In this regard the design of the communication system has to carefully take into account the ground station site and relevant signal phenomena, depending on the frequency band. To propose the optimal location of the ground station, these aspects become even more relevant to establish a trusted communication link due to the ground segment site in urban areas and/or selection of low orbits for the space segment. In addition, updated cartography with high resolution data of the location and its surroundings help to develop recommendations in the design of its location for spatial vehicles tracking and hence to improve effectiveness. The objectives of this analysis methodology are: completion of cartographic information, modelling the obstacles that hinder communication between the ground and space segment and representation in the generated 3D scene of the degree of impairment in the signal/noise of the phenomena that interferes with communication. The integration of new technologies of geographic data capture, such as 3D Laser Scan, determine that increased optimization of the antenna elevation mask, in its AOS and LOS azimuths along the horizon visible, maximizes visibility time with spatial vehicles. Furthermore, from the three-dimensional cloud of points captured, specific information is selected and, using 3D modeling techniques, the 3D scene of the antenna location site and surroundings is generated. The resulting 3D model evidences nearby obstacles related to the cartographic conditions such as mountain formations and buildings, and any additional obstacles that interfere with the operational quality of the antenna (other antennas and electronic devices that emit or receive in the same bandwidth

  12. An ABC analysis for power generation project

    OpenAIRE

    Batool Hasani; Younos Vakilalroaia

    2013-01-01

    One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC m...

  13. International Space Station Lithium-Ion Battery

    Science.gov (United States)

    Dalton, Penni J.; Schwanbeck, Eugene; North, Tim; Balcer, Sonia

    2016-01-01

    The International Space Station (ISS) primary Electric Power System (EPS) currently uses Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The electricity for the space station is generated by its solar arrays, which charge batteries during insolation for subsequent discharge during eclipse. The Ni-H2 batteries are designed to operate at a 35 depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. Since the oldest of the 48 Ni-H2 battery Orbital Replacement Units (ORUs) has been cycling since September 2006, these batteries are now approaching their end of useful life. In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the Ni-H2 batteries and concurrently funded a Li-Ion ORU and cell life testing project. When deployed, they will be the largest Li-Ion batteries ever utilized for a human-rated spacecraft. This paper will include an overview of the ISS Li-Ion battery system architecture, the Li-Ion battery design and development, controls to limit potential hazards from the batteries, and the status of the Li-Ion cell and ORU life cycle testing.

  14. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  15. Newport Research Station

    Data.gov (United States)

    Federal Laboratory Consortium — The Newport Research Station is the Center's only ocean-port research facility. This station is located at Oregon State University's Hatfield Marine Science Center,...

  16. Evaluation of Early Ground Control Station Configurations for Interacting with a UAS Traffic Management (UTM) System

    Science.gov (United States)

    Dao, Arik-Quang V.; Martin, Lynne; Mohlenbrink, Christoph; Bienert, Nancy; Wolte, Cynthia; Gomez, Ashley; Claudatos, Lauren; Mercer, Joey

    2017-01-01

    The purpose of this paper is to report on a human factors evaluation of ground control station design concepts for interacting with an unmanned traffic management system. The data collected for this paper comes from recent field tests for NASA's Unmanned Traffic Management (UTM) project, and covers the following topics; workload, situation awareness, as well as flight crew communication, coordination, and procedures. The goal of this evaluation was to determine if the various software implementations for interacting with the UTM system can be described and classified into design concepts to provide guidance for the development of future UTM interfaces. We begin with a brief description of NASA's UTM project, followed by a description of the test range configuration related to a second development phase. We identified (post hoc) two classes in which the ground control stations could be grouped. This grouping was based on level of display integration. The analysis was exploratory and informal. It was conducted to compare ground stations across those two classes and against the aforementioned topics. Herein, we discuss the results.

  17. Station Set Residual: Event Classification Using Historical Distribution of Observing Stations

    Science.gov (United States)

    Procopio, Mike; Lewis, Jennifer; Young, Chris

    2010-05-01

    Analysts working at the International Data Centre in support of treaty monitoring through the Comprehensive Nuclear-Test-Ban Treaty Organization spend a significant amount of time reviewing hypothesized seismic events produced by an automatic processing system. When reviewing these events to determine their legitimacy, analysts take a variety of approaches that rely heavily on training and past experience. One method used by analysts to gauge the validity of an event involves examining the set of stations involved in the detection of an event. In particular, leveraging past experience, an analyst can say that an event located in a certain part of the world is expected to be detected by Stations A, B, and C. Implicit in this statement is that such an event would usually not be detected by Stations X, Y, or Z. For some well understood parts of the world, the absence of one or more "expected" stations—or the presence of one or more "unexpected" stations—is correlated with a hypothesized event's legitimacy and to its survival to the event bulletin. The primary objective of this research is to formalize and quantify the difference between the observed set of stations detecting some hypothesized event, versus the expected set of stations historically associated with detecting similar nearby events close in magnitude. This Station Set Residual can be quantified in many ways, some of which are correlated with the analysts' determination of whether or not the event is valid. We propose that this Station Set Residual score can be used to screen out certain classes of "false" events produced by automatic processing with a high degree of confidence, reducing the analyst burden. Moreover, we propose that the visualization of the historically expected distribution of detecting stations can be immediately useful as an analyst aid during their review process.

  18. LWR-core behaviour project

    International Nuclear Information System (INIS)

    Paratte, J.M.

    1982-07-01

    The LWR-Core behaviour project concerns the mathematical simulation of a light water reactor in normal operation (emergency situations excluded). Computational tools are assembled, i.e. programs and libraries of data. These computational tools can likewise be used in nuclear power applications, industry and control applications. The project is divided into three parts: the development and application of calculation methods for quantisation determination of LWR physics; investigation of the behaviour of nuclear fuels under radiation with special attention to higher burnup; simulation of the operating transients of nuclear power stations. (A.N.K.)

  19. Weather Radar Stations

    Data.gov (United States)

    Department of Homeland Security — These data represent Next-Generation Radar (NEXRAD) and Terminal Doppler Weather Radar (TDWR) weather radar stations within the US. The NEXRAD radar stations are...

  20. Does environmental impact assessment really support technological change? Analyzing alternatives to coal-fired power stations in Denmark

    International Nuclear Information System (INIS)

    Lund, H.; Hvelplund, F.

    1997-01-01

    Danish energy policy calls for development of decentralized, cleaner technologies to replace conventional power stations and, since 1990, aims to reduce CO 2 emissions in 2005 to 20% below their 1988 level. These political goals require a technological change, from conventional, central power stations to cleaner, decentralized technologies such as energy conservation, cogeneration, and renewable energy. In principle, environmental impact assessment (EIA) supports this change on a project-by-project basis. The EU directive on EIA was based on the preventive principle: to eliminate pollution source rather than attempting to counteract it subsequently. According to the Danish implementation of the directive, an EIA must review a project's main alternatives and the environmental consequences of the alternatives. If this were done properly, EIAs could assist Denmark in meeting its CO 2 reduction goals. However, because EIA is implemented on a restricted, regional basis, it does not support technological change. Responsibility for the preparation of the EIA is given to the regional authorities through a law which does not require alternatives to be assessed that extend geographically beyond the boundaries of a regional authority. Thus, there is no certainty of serious analysis of cleaner technology alternatives to large coal-fired power stations. This conclusion is based on examination of three case studies using a participatory research method

  1. Technical, environmental, and economic assessment of deploying advanced coal power technologies in the Chinese context

    International Nuclear Information System (INIS)

    Zhao Lifeng; Xiao Yunhan; Gallagher, Kelly Sims; Wang Bo; Xu Xiang

    2008-01-01

    The goal of this study is to evaluate the technical, environmental, and economic dimensions of deploying advanced coal-fired power technologies in China. In particular, we estimate the differences in capital cost and overall cost of electricity (COE) for a variety of advanced coal-power technologies based on the technological and economic levels in 2006 in China. This paper explores the economic gaps between Integrated Gasification Combined Cycle (IGCC) and other advanced coal power technologies, and compares 12 different power plant configurations using advanced coal power technologies. Super critical (SC) and ultra super critical (USC) pulverized coal (PC) power generation technologies coupled with pollution control technologies can meet the emission requirements. These technologies are highly efficient, technically mature, and cost-effective. From the point of view of efficiency, SC and USC units are good choices for power industry. The net plant efficiency for IGCC has reached 45%, and it has the best environmental performance overall. The cost of IGCC is much higher, however, than that of other power generation technologies, so the development of IGCC is slow throughout the world. Incentive policies are needed if IGCC is to be deployed in China

  2. Coal Integrated Gasification Fuel Cell System Study

    Energy Technology Data Exchange (ETDEWEB)

    Chellappa Balan; Debashis Dey; Sukru-Alper Eker; Max Peter; Pavel Sokolov; Greg Wotzak

    2004-01-31

    This study analyzes the performance and economics of power generation systems based on Solid Oxide Fuel Cell (SOFC) technology and fueled by gasified coal. System concepts that integrate a coal gasifier with a SOFC, a gas turbine, and a steam turbine were developed and analyzed for plant sizes in excess of 200 MW. Two alternative integration configurations were selected with projected system efficiency of over 53% on a HHV basis, or about 10 percentage points higher than that of the state-of-the-art Integrated Gasification Combined Cycle (IGCC) systems. The initial cost of both selected configurations was found to be comparable with the IGCC system costs at approximately $1700/kW. An absorption-based CO2 isolation scheme was developed, and its penalty on the system performance and cost was estimated to be less approximately 2.7% and $370/kW. Technology gaps and required engineering development efforts were identified and evaluated.

  3. Description of a project management system software tool (Sugar)

    International Nuclear Information System (INIS)

    Saito, T.

    2000-01-01

    Toshiba has developed a project management tool that can be applied to large-scale and complicated projects such as the outage of a nuclear power station. The project management tool (Sugar) which Toshiba developed is excellent in operative visibility and extendibility, and has been developed from the beginning for use in nuclear periodic-inspection project control. Here, the development circumstances of this project management tool (Sugar) and the feature are described, and an easy demonstration is provided as an example. (author)

  4. Nucla circulating atmospheric fluidized bed demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Keith, Raymond E.

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute's decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  5. New Porta Susa - Turin Railway Station

    Directory of Open Access Journals (Sweden)

    Silvio d'Ascia

    2011-02-01

    Full Text Available The project of the new station of Torino Porta Susa is the project of a huge urban public space, where the station, conceived as an urban gallery, becomes a real street, a “passage”, a new kind of urbanity shape for the future city. The railway station’s transparent volume - a 385 m (the length of the TGV long steel and glass tunnel, 30 m. width, with a variable height compared to the outdoor street level (between 12 and 3 m at the height of the cover - is proposed as a modern reinterpretation of the nineteenth century’s urban galleries and the great historical station’s halles, as well as a kind of symbolic building. Symbol of movement, of the travel universe and the presence of the transportation universe in the contemporary city, urban simulacrum of the object train disappeared from the urban scene below the future Central Spine. The sinuous movement of the tunnel follows the flows of urban pedestrians from the city towards the different transportation modes presents at various levels (national and international lines AV, regional lines, subways, taxis ... emphasizing with its lowering the presence of the big void inside of the underground subway station, about 20 meters deep. The gallery, oriented north-south, folds with its internal pedestrian paths to bring natural light and the sky of Turin, to the quays of trains (at an altitude of -10 m and the Subway (which share -20, transformed so’ in a sort of urban sidewalks. The fast rhythm of the structure of arches with step 360 cm. is marked by the presence of numerous openings along the longitudinal development of the gallery, which is crossed by three transversal passages inside the gallery and is bounded by two others on the north and south of the lot, connecting the city from east to west at street level in continuity with pre-existing axes. The presence of these transversal passages accentuates the urban value of the Spina which was to re-connect the two sides of the city until

  6. Streamflow Gaging Stations

    Data.gov (United States)

    Department of Homeland Security — This map layer shows selected streamflow gaging stations of the United States, Puerto Rico, and the U.S. Virgin Islands, in 2013. Gaging stations, or gages, measure...

  7. Ocean Station Vessel

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ocean Station Vessels (OSV) or Weather Ships captured atmospheric conditions while being stationed continuously in a single location. While While most of the...

  8. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  9. Geopolitical model of investment power station construction project implementation

    Science.gov (United States)

    Malafeyev, Oleg; Farvazov, Konstantin; Zenovich, Olga; Zaitseva, Irina; Kostyukov, Konstantin; Svechinskaya, Tatiana

    2018-04-01

    Two geopolitical actors implement a geopolitical project that involves transportaion and storage of some commodities. They interact with each other through a transport network. The network consists of several interconnected vertices. Some of the vetrices are trading hubs, storage spaces, production hubs and goods buyers. Actors wish to satify the demand of buyers and recieve the highest possible profit subject to compromise solution principle. A numerical example is given.

  10. A Case Study on Stratified Settlement and Rebound Characteristics due to Dewatering in Shanghai Subway Station

    OpenAIRE

    Wang, Jianxiu; Huang, Tianrong; Sui, Dongchang

    2013-01-01

    Based on the Yishan Metro Station Project of Shanghai Metro Line number 9, a centrifugal model test was conducted to investigate the behavior of stratified settlement and rebound (SSR) of Shanghai soft clay caused by dewatering in deep subway station pit. The soil model was composed of three layers, and the dewatering process was simulated by self-invention of decompressing devise. The results indicate that SSR occurs when the decompression was carried out, and only negative rebound was found...

  11. Astrobee: Developing a Free Flying Robot for the International Space Station

    Science.gov (United States)

    Bualat, Maria; Barlow, Jonathan; Fong, Terrence; Provencher, Christopher; Smith, Trey; Zuniga, Allison

    2015-01-01

    Astronaut time will always be in short supply, consumables (e.g., oxygen) will always be limited, and some work will not be feasible, or productive, for astronauts to do manually. Free flyers offer significant potential to perform a great variety of tasks, include routine, repetitive or simple but long-duration work, such as conducting environment surveys, taking sensor readings or monitoring crew activities. The "Astrobee" project is developing a new free flying robot system suitable for performing Intravehicular Activity (IVA) work on the International Space Station (ISS). This paper will describe the Astrobee project objectives, initial design, concept of operations, and key challenges.

  12. User-Friendly End Station at the ALS for Nanostructure Characterization

    International Nuclear Information System (INIS)

    F. J. Himpsel; P. Alivisatos; T. Callcott; J. Carlisle; J. D. Denlinger; D. E. Eastman; D. Ederer; Z. Hussain; L.J. Terminello; T. Van Buuren; R. S. Williams

    2006-01-01

    This is a construction project for an end station at the ALS, which is optimized for measuring NEXAFS of nanostructures with fluorescence detection. Compared to the usual electron yield detection, fluorescence is able to probe buried structures and is sensitive to dilute species, such as nanostructures supported on a substrate. Since the quantum yield for fluorescence is 10 -4 -10 -5 times smaller than for electrons in the soft x-ray regime, such an end station requires bright undulator beamlines at the ALS. In order to optimize the setup for a wide range of applications, two end stations were built: (1) A simple, mobile chamber with efficient photon detection (>10 4 times the solid angle collection of fluorescence spectrographs) and a built-in magnet for MCD measurements at EPU beamlines (Fig. 1 left). It allows rapid mapping the electronic states of nanostructures (nanocrystals, nanowires, tailored magnetic materials, buried interfaces, biologically-functionalized surfaces). It was used with BL 8.0 (linear polarized undulator) and BL 4.0 (variable polarization). (2) A sophisticated, stationary end station operating at Beamline 8.0 (Fig. 1 right). It contains an array of surface characterization instruments and a micro-focus capability for scanning across graded samples (wedges for thickness variation, stoichiometry gradients, and general variations of the sample preparation conditions for optimizing nanostructures)

  13. Reference Climatological Stations

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Reference Climatological Stations (RCS) network represents the first effort by NOAA to create and maintain a nationwide network of stations located only in areas...

  14. Fire Stations - 2007

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Station Locations in Kansas Any location where fire fighters are stationed at or based out of, or where equipment that such personnel use in carrying out their...

  15. Fire Stations - 2009

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Stations in Kansas Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their jobs is...

  16. International Space Station Configuration Analysis and Integration

    Science.gov (United States)

    Anchondo, Rebekah

    2016-01-01

    Ambitious engineering projects, such as NASA's International Space Station (ISS), require dependable modeling, analysis, visualization, and robotics to ensure that complex mission strategies are carried out cost effectively, sustainably, and safely. Learn how Booz Allen Hamilton's Modeling, Analysis, Visualization, and Robotics Integration Center (MAVRIC) team performs engineering analysis of the ISS Configuration based primarily on the use of 3D CAD models. To support mission planning and execution, the team tracks the configuration of ISS and maintains configuration requirements to ensure operational goals are met. The MAVRIC team performs multi-disciplinary integration and trade studies to ensure future configurations meet stakeholder needs.

  17. New construction of the Wespimuehle small hydro power station in Winterthur, Switzerland; Stadt Winterthur (ZH). Neubau Kleinwasserkraftwerk Wespimuehle - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents a project concerning the renewal of an existing small hydro installation in the historical Wespimuehle on the Toess river in Winterthur, Switzerland. The existing installation is described as is the station's present concession. The proposals for the renewal of this installation are described and discussed, including water intake, electro-mechanical components and the station's tail water channel. The necessary building work and access to the installations are discussed. Investment, operating and maintenance costs are discussed. The expected profits to be gained from the new installation and the risks involved in the project are discussed.

  18. Biomass for electricity

    International Nuclear Information System (INIS)

    Barbucci, P.; Neri, G.; Trebbi, G.

    1995-01-01

    This paper describes the activities carried out at ENEL-Thermal research center to develop technologies suitable to convert biomass into power with high conversion efficiency: a demonstration project, Energy Farm, to build an Integrated Gasification Combined Cycle (IGCC) plant fed by wood chips; a demonstration plant for converting wood chips into oil by thermal conversion (pyrolysis oil); combustion tests of different oils produced by thermal conversion. 3 figs., 1 tab

  19. The decision on the application to carry out a decommissioning project at Hinkley Point A Power Station under the Nuclear Reactors (Environmental Impact Assessment for Decommissioning) Regulations 1999

    International Nuclear Information System (INIS)

    2003-01-01

    European Council Directive 85/337/EEC, as amended by Council Directive 97/1 I/EC, sets out a framework on the assessment of the effects of certain public and private projects on the environment. The Directive is implemented in Great Britain for decommissioning nuclear reactor projects by the Nuclear Reactors (Environmental Impact Assessment for Decommissioning) Regulations 1999. The intention of the Directive and Regulations is to involve the public through consultation in considering the potential environmental impacts of a decommissioning project, and to make the decision-making process on granting consent open and transparent. The Regulations require the licensee to undertake an environmental impact assessment, prepare an environmental statement that summarises the environmental effects of the project, and apply to the Health and Safety Executive (HSE) for consent to carry out a decommissioning project. There is an optional stage where the licensee may request from HSE an opinion on what the environmental statement should contain (called a pre-application opinion). The licensee of Hinkley Point A Power Station, Magnox Electric pie, requested a pre-application opinion and provided information in a scoping report in December 2000. HSE undertook a public consultation on the scoping report and provided its pre- application opinion in April 2001. The licensee applied to HSE for consent to carry out a decommissioning project and provided an environmental statement in December 2001. Following a public consultation on the environmental statement, HSE requested further information that was subsequently provided by the licensee. A further public consultation was undertaken on the further information that ended in March 2003. All these public consultations involved around 60 organisations. HSE granted consent to carry out a decommissioning project at Hinkley Point A Power Station under the Regulations in July 2003, and attached conditions to the Consent. HSE took relevant

  20. Comparison of the CATHENA model of Gentilly-2 end shield cooling system predictions to station data

    Energy Technology Data Exchange (ETDEWEB)

    Zagre, G.; Sabourin, G. [Candu Energy Inc., Montreal, Quebec (Canada); Chapados, S. [Hydro-Quebec, Montreal, Quebec (Canada)

    2012-07-01

    As part of the Gentilly-2 Refurbishment Project, Hydro-Quebec has elected to perform the End Shield Cooling Safety Analysis. A CATHENA model of Gentilly-2 End Shield Cooling System was developed for this purpose. This model includes new elements compared to other CANDU6 End Shield Cooling models such as a detailed heat exchanger and control logic model. In order to test the model robustness and accuracy, the model predictions were compared with plant measurements.This paper summarizes this comparison between the model predictions and the station measurements. It is shown that the CATHENA model is flexible and accurate enough to predict station measurements for critical parameters, and the detailed heat exchanger model allows reproducing station transients. (author)

  1. Station History Of The Seismic Station In Ahmadu Bello University ...

    African Journals Online (AJOL)

    Dominants in the selected events are events from Meditterranian, East Kazakhstan, India/Burma/China, South and Central America and North Ascension island regions. The limited number of events reporting at the station was due to low operational gain at the station which permitted only events whose magnitudes are ...

  2. The Trencin water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Trencin water power station. The Trencin water power station was built seven years after the Dubnica nad Vahom water power station started its operation and was the last stage of the first and the oldest derived cascade of water power stations on the Vah River. After completing water power stations at Ladce (1936), Ilava (1946) and Dubnica nad Vahom (1949) and before constructing the Trencin water power station, the whole second derived cascade of water power stations including water power stations at Kostolna, Nove Mesto nad Vahom and Horna Streda was built as soon as possible mainly because the need to get compensation for discontinued electricity supplies as well as energetic coal from the Czech Republic. Hereby, experiences from the construction of previous grades were used, mainly as far as the dimensioning was concerned, as the fi rst installed power stations had, in comparison with the growing requirements on the electricity supplies, very low absorption capacity - only 150 m 3 .s -1 . Thus the Trencin power station (original name was the Skalka power station) was already dimensioned for the same absorption capacity as the cascade located downstream the river, that is 180 m 3 .s -1 . That was related also to growing demands on electricity supplies during the peaks in the daily electric system load diagram, and thus to the transfer from continuous operation of the water power station to semi-peak or even peak performance. According to the standards of power station classification, the Trencin water power station is a medium size, low pressure, channel power station with two units equipped by Kaplan turbines and synchronous hydro-alternators. The water power station installed capacity is 16.1 MW in total and its designed annual production of electrical energy for medium water year is 85,000 MWh, while the average annual production during the last 30 years is 86,252 MWh. Installed unit has a four-blade Kaplan turbine with the diameter

  3. Advanced modeling and simulation of integrated gasification combined cycle power plants with CO{sub 2}-capture

    Energy Technology Data Exchange (ETDEWEB)

    Rieger, Mathias

    2014-04-17

    The objective of this thesis is to provide an extensive description of the correlations in some of the most crucial sub-processes for hard coal fired IGCC with carbon capture (CC-IGCC). For this purpose, process simulation models are developed for four industrial gasification processes, the CO-shift cycle, the acid gas removal unit, the sulfur recovery process, the gas turbine, the water-/steam cycle and the air separation unit (ASU). Process simulations clarify the influence of certain boundary conditions on plant operation, performance and economics. Based on that, a comparative benchmark of CC-IGCC concepts is conducted. Furthermore, the influence of integration between the gas turbine and the ASU is analyzed in detail. The generated findings are used to develop an advanced plant configuration with improved economics. Nevertheless, IGCC power plants with carbon capture are not found to be an economically efficient power generation technology at present day boundary conditions.

  4. Advanced modeling and simulation of integrated gasification combined cycle power plants with CO2-capture

    International Nuclear Information System (INIS)

    Rieger, Mathias

    2014-01-01

    The objective of this thesis is to provide an extensive description of the correlations in some of the most crucial sub-processes for hard coal fired IGCC with carbon capture (CC-IGCC). For this purpose, process simulation models are developed for four industrial gasification processes, the CO-shift cycle, the acid gas removal unit, the sulfur recovery process, the gas turbine, the water-/steam cycle and the air separation unit (ASU). Process simulations clarify the influence of certain boundary conditions on plant operation, performance and economics. Based on that, a comparative benchmark of CC-IGCC concepts is conducted. Furthermore, the influence of integration between the gas turbine and the ASU is analyzed in detail. The generated findings are used to develop an advanced plant configuration with improved economics. Nevertheless, IGCC power plants with carbon capture are not found to be an economically efficient power generation technology at present day boundary conditions.

  5. Tether applications for space station

    Science.gov (United States)

    Nobles, W.

    1986-01-01

    A wide variety of space station applications for tethers were reviewed. Many will affect the operation of the station itself while others are in the category of research or scientific platforms. One of the most expensive aspects of operating the space station will be the continuing shuttle traffic to transport logistic supplies and payloads to the space station. If a means can be found to use tethers to improve the efficiency of that transportation operation, it will increase the operating efficiency of the system and reduce the overall cost of the space station. The concept studied consists of using a tether to lower the shuttle from the space station. This results in a transfer of angular momentum and energy from the orbiter to the space station. The consequences of this transfer is studied and how beneficial use can be made of it.

  6. Water shortage and drought monitoring in Bačka region (Vojvodina, North Serbia: Setting-up measurement stations network

    Directory of Open Access Journals (Sweden)

    Jovanović Mlađen

    2013-01-01

    Full Text Available Water shortage and drought, as the most important hydro-climatic hazards, cause significant damages in case of most continents including SE Europe. An experimental field established in Bačka region (Vojvodina Autonomous Province, North Serbia for the purpose of droughts/water shortage monitoring and remote sensing under ongoing IPA project 'Water shortage hazard and adaptive water management strategies in the Hungarian-Serbian cross-border region' (WAHASTRAT. The main objective of this project is to determine water shortage con­flicts on a local and regional level, and to reveal the frequency, extent and severity of future hydro-cli­matic hazards. The locations of eight measurement stations selected on the principle of representativeness in term of terrain configuration and soil cover. An area in which measurement stations were placed, covers about 1000 km2 (12% of total area of Bačka and includes geomorphic units which reliable represent the relief of the whole Bačka region. Measurement stations were placed on 4 out of 5 most common soil types in the Bačka and Vojvodina: chernozem, alluvial soils, smonitza and saline and alkali soils. A measurement equipment system was constructed for the requirements of the WAHASTRAT project. The aim was to design a user-friendly and affordable IT solution, which would enable continuous re­mote monitoring of meteorological parameters and soil moisture. Independent solar-powered meas­urement stations are able to automatically measure air temperature, air humidity, wind speed, wind di­rection, precipitation and soil moisture.

  7. The European Spallation Source (ESS) project

    International Nuclear Information System (INIS)

    Clausen, K.N.

    2001-01-01

    The European Spallation Source (ESS) is a proposal for a next generation neutron source in Europe. The first phase of the project - establishing the scientific case and the technical feasibility - is now followed by an intensive period of R and D activities. Three target station options: l) a 5 MW 50 Hz short pulse station, 2) a 1 MW 10 Hz short pulse station and 3) a 4 to 5 MW 16 2/3 Hz 2.5 ms long pulse station, and the use of novel advanced cold moderators will be studied. A superconducting option for the accelerator will be investigated in a Europe-wide feasibility study for a multipurpose facility (CONCERT) with potential applications in areas such as neutron scattering, high power irradiation, R and D on transmutation and radioactive beams. It will explore possible synergies of such a facility compared with a standalone solution for the ESS. The milestones for the next three years are: June 2001 - Decision on neutron parameters and target station options, June 2002 - Conclusion of the Concert multipurpose accelerator study and June 2003 - Proposal ready for submission to funding agencies. The facility could be ready for operation around 2010. (author)

  8. Analysis methodology of power generation/cogeneration designs in VNG (Vehicular Natural Gas) stations; Metodologia de analise de projetos de geracao/cogeracao em postos GNV (Gas Natural Veicular)

    Energy Technology Data Exchange (ETDEWEB)

    Romanos, Rafael Reami [Companhia de Gas de Santa Catarina (SCGAS), Florianopolis, SC (Brazil)

    2008-07-01

    This work presents the methodology for analysis of generation/cogeneration projects in NGV filling stations, determining the influence of critical parameters in its technical-economic viability. To achieve this methodology, it was necessary to define parameters that influence directly or indirectly the size of a generating system, as the total electric demand of the filling station, ratio (power of the compressor) / (total installed power), load factor, factor of simultaneity, technical data of major equipment, among others. The methodology has been validated by comparing with data measured in a NGV filling station and allows screening and identifying customers with technical feasibility to evolve in a generation or cogeneration project. The cogeneration with NG generators was highlighted during the analysis of the NGV filling stations and was feasible for establishments which have large thermal demand, as filling stations along the road with large amounts of electric showers in changing rooms. (author)

  9. Mobile environmental radiation monitoring station

    International Nuclear Information System (INIS)

    Assido, H.; Shemesh, Y.; Mazor, T.; Tal, N.; Barak, D.

    1997-01-01

    A mobile environmental radiation monitoring station has been developed and established for the Israeli Ministry of Environment. The radiation monitoring station is ready for immediate placing in any required location, or can be operated from a vehicle. The station collects data Tom the detector and transfers it via cellular communication network to a Computerized Control Center for data storage, processing, and display . The mobile station is fully controlled from the. Routinely, the mobile station responses to the data request accumulated since the last communication session. In case of fault or alarm condition in the mobile station, a local claim is activated and immediately initiates communication with the via cellular communication network. (authors)

  10. AECB staff annual assessment of the Point Lepreau Nuclear Generating Station for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    This report is the Atomic Energy Control Board assessment of safety at Point Lepreau Generating Station for 1994. AECB on-site Project Officers, and Ottawa based specialists monitored the station throughout the year. The station operated safely during 1994. Performance of the special safety systems was very good, and NB Power made important progress improving the safety management of these systems. NB Power staff failed to comply with the conditions of our Operating Licence seven times during 1994. This is an improvement from last year, but the number of compliance problems is still too high. NB Power introduced safety culture training for its staff last year. AECB is optimistic that this will help to improve compliance. The station fully met the radiation safety requirements during the year. Releases of radioactive material to the environment are well below the limits set. Radiation exposure to workers are being well controlled, and AECB believe that NB Power is maintaining these exposures 'As Low As Reasonably Achievable' for this reactor type

  11. optimization and renewal of a radio-weather station

    International Nuclear Information System (INIS)

    Saidani, Emna

    2012-01-01

    Our project, realised within the National Center for Nuclear Sciences and Technologies, is entitled the optimization and renewal of a radio-weather station. During this project we studied different sensors types and performances. Indeed, the work involved the development of these sensors and the communication with the data acquisition unit DAU16 to determine the data measured and collected by the unit. Theoretical studies helped us to conceive detectors types and their operation, and then it has been realized by the implementation of all sensors especially the Geiger-Muller detector called GP110i by Canberra. In order to improve the system and to avoid moving difficulty to have measurement data we have tested and studied two possibilities to use network instead of using cable connection: the PLC PK2100 and the system applied to Oued Medjerda.

  12. CDIP Station Data Collection - All Stations

    Data.gov (United States)

    Scripps Institution of Oceanography, UC San Diego — The Coastal Data Information Program's station data collection consists of all publicly-released coastal environment measurements taken over the program's history, a...

  13. Proposed purchasing, employment and training policies for northern projects

    International Nuclear Information System (INIS)

    1991-09-01

    Manitoba Hydro is about to embark on a major construction project in the northern part of the province. Important considerations involved in this project include purchasing the necessary materials, products, and services, and employing a suitable work force. An outline is presented of draft policies being considered by Manitoba Hydro to enhance northern-aboriginal and northern participation in its future development projects in northern Manitoba. The policies are presented in four sections: purchasing for northern construction and operation activities; training and employment for construction of a generation station and expansion of a converter station; training and employment for construction of a major north-south transmission line; and training and employment for northern operations and maintenance work at existing facilities. Aspects of these policies include giving preference in purchasing to northern and aboriginal businesses, training initiatives and employee counselling for aboriginal employees, and hiring preferences directed toward northern aboriginals and northern residents

  14. Ensuring effective project management

    International Nuclear Information System (INIS)

    Ward, J.N.

    1980-01-01

    A brief description is given of the organisation methods employed by the Bechtel Power Corporation, in their contract with Mississippi Power and Light Company for the design, construction and procurement activities for the Grand Gulf Nuclear Station. The aim is to ensure effective management, and good communications at all stages of construction, between the project team and the client. (U.K.)

  15. Cooperating expert systems for Space Station - Power/thermal subsystem testbeds

    Science.gov (United States)

    Wong, Carla M.; Weeks, David J.; Sundberg, Gale R.; Healey, Kathleen L.; Dominick, Jeffrey S.

    1988-01-01

    The Systems Autonomy Demonstration Project (SADP) is a NASA-sponsored series of increasingly complex demonstrations to show the benefits of integrating knowledge-based systems with conventional process control in real-time, real-world problem domains that can facilitate the operations and availability of major Space Station distributed systems. This paper describes the system design, objectives, approaches, and status of each of the testbed knowledge-based systems. Simplified schematics of the systems are shown.

  16. A customer-friendly Space Station

    Science.gov (United States)

    Pivirotto, D. S.

    1984-01-01

    This paper discusses the relationship of customers to the Space Station Program currently being defined by NASA. Emphasis is on definition of the Program such that the Space Station will be conducive to use by customers, that is by people who utilize the services provided by the Space Station and its associated platforms and vehicles. Potential types of customers are identified. Scenarios are developed for ways in which different types of customers can utilize the Space Station. Both management and technical issues involved in making the Station 'customer friendly' are discussed.

  17. Integrated gasification combined cycle for acid rain control

    Energy Technology Data Exchange (ETDEWEB)

    Simbeck, D.R.; Dickenson, R.L.

    1986-10-01

    The role of integrated coal gasification combined-cycle power plants in the abatement of emission of SO/sub 2/ and NO/sub 2/ which lead to acid rain is discussed. The economics of this IGCC approach are assessed for a nominal 500 MW plant size. Phased construction of IGCC plants is recommended as a means of reducing SO/sub 2/ and NO/sub x/ emissions noting that high-sulfur coals could continue to be used. It is also noted that phased construction IGCC is the only acid rain control technology that greatly reduces NO/sub x/. 17 references.

  18. A summary of lessons learned at the Shippingport Station Decommissioning Project (SSDP)

    International Nuclear Information System (INIS)

    Crimi, F.P.; Mullee, G.R.

    1987-10-01

    This paper describes the lessons learned from a management perspective during decommissioning. The lessons learned are presented in a chronological sequence during the life of the project up to the present time. The careful analysis of the lessons learned and the implementation of corresponding actions have contributed toward improving the effectiveness of decommissioning as time progresses. The lessons learned should be helpful in planning future decommissioning projects

  19. Degradation of TBC Systems in Environments Relevant to Advanced Gas Turbines for IGCC Systems

    Science.gov (United States)

    Bohna, Nathaniel Allan

    Plasma sprayed (PS) thermal barrier coatings (TBCs) are used to provide thermal insulation for the hottest components in gas turbines. Zirconia stabilized with 7wt% yttria (7YSZ) is the most common ceramic top coat used for turbine blades. The 7YSZ coating can be degraded by the buildup of fly-ash deposits which can arise from the fuel source (coal/biomass) used in the combustion process in gas turbines. Fly-ash from the integrated gasification combined cycle (IGCC) process can result from coal-based syngas and also from ambient air which passes through the system. TBCs are also exposed to harsh gas environments containing CO2, SO2, and steam. As presented in this thesis, degradation from the combined effects of fly-ash and harsh gas atmosphere can severely limit TBC lifetimes. It is well established that degradation at very high temperatures (≥1250°C) from deposits consisting of the oxides CaO-MgO-Al2O3-SiO 2 results from extensive liquid silicate infiltration into the porous top coat of the YSZ. This infiltration causes early failure resulting from chemical and/or mechanical damage to the ceramic layer. Damage resulting from liquid infiltration, however, is not typically considered at relatively lower temperatures around 1100°C because liquid silicates would not be expected to form from the oxides in the deposit. A key focus of this study is to assess the mode and extent of TBC degradation at 1100°C in cases when some amount of liquid forms owing to the presence of K2SO4 as a minor ash constituent. Two types of liquid infiltrations are observed depending on the principal oxide (i.e., CaO or SiO2) in the deposit. The degradation is primarily the result of mechanical damage, which results from infiltration caused by the interaction of liquid K2SO4 with either the CaO or SiO2. The TBCs used in this work are representative of commonly used coatings used in the hottest sections of land-based gas turbines. The specimens consist of 7YSZ top coats deposited on

  20. SUPPORT OF GULF OF MEXICO HYDRATE RESEARCH CONSORTIUM: ACTIVITIES TO SUPPORT ESTABLISHMENT OF A SEA FLOOR MONITORING STATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Paul Higley; J. Robert Woolsey; Ralph Goodman; Vernon Asper; Boris Mizaikoff; Angela Davis; Bob A. Hardage; Jeffrey Chanton; Rudy Rogers

    2006-03-01

    The Gulf of Mexico Hydrates Research Consortium was established in 1999 to assemble leaders in gas hydrates research. The group is administered by the Center for Marine Resources and Environmental Technology, CMRET, at the University of Mississippi. The primary objective of the group is to design and emplace a remote monitoring station or sea floor observatory on the sea floor in the northern Gulf of Mexico by the year 2005, in an area where gas hydrates are known to be present at, or just below, the sea floor. This mission necessitates assembling a station that will monitor physical and chemical parameters of the sea water and sea floor sediments on a more-or-less continuous basis over an extended period of time. Development of the station has always included the possibility of expanding its capabilities to include biological monitoring, as a means of assessing environmental health. This possibility has recently received increased attention and the group of researchers working on the station has expanded to include several microbial biologists. Establishment of the Consortium has succeeded in fulfilling the critical need to coordinate activities, avoid redundancies and communicate effectively among researchers in this relatively new research arena. Complementary expertise, both scientific and technical, has been assembled to promote innovative research methods and construct necessary instrumentation. Initial components of the observatory, a probe that collects pore-fluid samples and another that records sea floor temperatures, were deployed in Mississippi Canyon 118 in May of 2005. Follow-up deployments are planned for fall 2005 and center about the use of the vessel M/V Ocean Quest and its two manned submersibles. The subs will be used to effect bottom surveys, emplace sensors and sea floor experiments and make connections between sensor data loggers and the integrated data power unit (IDP). Station/observatory completion is anticipated for 2007 following the

  1. The market outlook for integrated gasification combined cycle technology

    International Nuclear Information System (INIS)

    MacGregor, P.R.; Maslak, C.E.; Stoll, H.G.

    1991-01-01

    Integrated gasification combined cycle (IGCC) technology was developed in the 1970s and is now competitive with other coal fired technologies. Because it is a new technology, IGCC technology developments are continuing at a rapid pace and the trend in decreasing capital costs is similar to the same trend seen during the early decades of simple cycle gas turbines. Consequently, IGCC technology is expected to be even more economical during the mid and late 1990s than it is today. The objective of this paper is to provide an examination of the basic economic principles of IGCC technology and to illustrate the extent to which this technology is a viable least-cost generation addition technology. Moreover, key reliability and emissions issues are addressed in relation to the technology alternatives. This paper is organized to first review the IGCC technology and to contrast its reliability, emission, performance and cost data with the three key commercially proven technologies: simple cycle combustion turbines, combined cycle plants, and coal-fired steam plants. Economic screening curves are used to illustrate the need for a balanced generation expansion mix of technologies. The regional market opportunity for coal fueled technology orders in the US from 1992 through 2005 is presented

  2. Sociological impacts of nuclear generating stations - summary report on the NRC post-licensing studies. Final report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Chalmers, J.; Pijawka, D.; Branch, K.; Bergmann, P.; Flynn, J.

    1982-07-01

    The Post-Licensing Studies had four objectives. The first was to identify the socioeconomic effects resulting from the construction and operation of each of twelve nuclear power stations. The socioeconomic variables examined included: economic, demographic, housing, government, public response, and social organization characteristics. The second objective was to determine the way in which the identified effects were evaluated by study area groups. The third objective was to identify the determinants of the project-related effects. This task required knowledge of what combination of site, project, or other determinants was responsible for the project-related effects and for the evaluation of the effects. The fourth objective was to make recommendations with respect to assessment methodologies that could best be used to project the socioeconomic effects of the construction and operation of proposed nuclear generating stations. The objectives of the Post-Licensing Studies are met by the twelve individual case studies and by the Summary Report. The case studies identified the nuclear power stations and describe the evaluation of the effects by area residents. The Summary Report describes the collective findings of the individual case studies, compares the findings across sites to identify possible determinants of the effects, and examines the implication of the findings for future siting decisions and for the methodology most appropriate for projective assessments

  3. Analysis of transmission speed of AX.25 Protocol implemented in satellital earth station UPTC

    Directory of Open Access Journals (Sweden)

    Oscar Fernando Vera Cely

    2015-11-01

    Full Text Available One of the important parameters for the proper functioning of satellital ground station projected on Pedagogical and Technological University of Colombia (UPTC is the efficiency in transmission speed on communications protocol. This paper shows the results of analysis of the transmission speed of the AX.25 protocol implemented in the communication system of the satellital ground station UPTC. It begins with a brief description of the implemented hardware; the behavior of the transmission rate is evaluated using a theoretical analysis based on equations to estimate this parameter in the operation of the protocol, then tests are performed using the hardware that the satellital ground station UPTC has and finally, the conclusions are presented. Based on comparison of the theoretical analysis results obtained experimentally, it became apparent that AX.25 protocol efficiency is higher when increasing the number of frames.

  4. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  5. GASIFICACIÓN DE CARBÓN PARA GENERACIÓN DE ENERGÍA ELÉCTRICA: ANÁLISIS CON VALORACIÓN DE OPCIONES REALES COAL GASIFICATION FOR POWER GENERATION: ANALYSIS WITH REAL OPTIONS VALUATION

    Directory of Open Access Journals (Sweden)

    Alejandro Concha A

    2009-12-01

    Coal plant (PC and, alternatively, an Integrated Gasification to Combined Cycle plant (IGCC. In this last case, the fuel switching option of the IGCC plant is analyzed. For the fuel prices, Inhomogeneous Geometric Brownian Movement processes are used. In both cases, two prices scenarios are considered with sensitivity analysis. Regarding the first case, adaptation to syngas in a NGCC plant is economically desirable, having the project a high sensitivity to efficiency. The sensitivity about investment is not significant, nor to the operating expenses. Concerning the second case, the economic convenience of the IGCC plant in front of the PC plant is not clear in the price scenarios considered. But analyzed in various combinations of prices, flexible operating IGCC plant alternating two fuels can achieve economic advantages. With regard to the sensitivity, conclusions mentioned in the first case are similars for the second case.

  6. Space station propulsion requirements study

    Science.gov (United States)

    Wilkinson, C. L.; Brennan, S. M.

    1985-01-01

    Propulsion system requirements to support Low Earth Orbit (LEO) manned space station development and evolution over a wide range of potential capabilities and for a variety of STS servicing and space station operating strategies are described. The term space station and the overall space station configuration refers, for the purpose of this report, to a group of potential LEO spacecraft that support the overall space station mission. The group consisted of the central space station at 28.5 deg or 90 deg inclinations, unmanned free-flying spacecraft that are both tethered and untethered, a short-range servicing vehicle, and a longer range servicing vehicle capable of GEO payload transfer. The time phasing for preferred propulsion technology approaches is also investigated, as well as the high-leverage, state-of-the-art advancements needed, and the qualitative and quantitative benefits of these advancements on STS/space station operations. The time frame of propulsion technologies applicable to this study is the early 1990's to approximately the year 2000.

  7. The 'Chriz' small hydro project; Kleinkraftwerk Chriz - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Amacker, P.

    2008-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the project for the renewal of a small hydropower installation in the village of Eischoll in the Swiss Alps. The history of the power station is reviewed and its present state is analysed. The possibilities for its renewal and project financing are discussed, as are rights concerning the use of water and regional planning aspects. The project foresees the use of various older installations and the construction of a new turbine house in the valley. Details on dimensions, the proposed installed power and energy production of the scheme are presented as well as details on the connection to the electricity mains. Environmental aspects and details on the costs and time-scales involved in the construction of the small power station are presented.

  8. Monitoring the progress of NFFO-3 projects: short rotation willow coppice - agronomy and economics

    International Nuclear Information System (INIS)

    Twemlow, R.K.M.

    1997-01-01

    The involvement of Sidney C. Banks p.l.c., and the subsidiary company Banks Agriculture, in fuel supply for biofuelled power stations started some 4 years ago. When identifying possible opportunities and crops it was apparent that, with the third tranche of Non-Fossil Fuel Obligations (NFFO3) coming up, there were companies looking at developing biofuelled power stations, using Short Rotation Coppice (SRC) and for this they needed to link with potential fuel suppliers. Sidney C. Banks p.l.c. linked with South Western Power (SWP) (a subsidiary of South Western Electricity p.l.c. (SWEB)) to act as their sole fuel supplier on projected biofuel wood power stations. Subsequently two wood fuelled power stations were awarded to SWP and Sidney C. Banks p.l.c. in the 3rd Tranche from NFFO, in December 1994. The objectives of this project were to: establish a network of SRC growers to produce fuel for a NFFO project; monitor the success of the enterprise; implement a programme of constant improvement to optimise the fuel supply strategy; and provide valuable information as to the performance of the SRC crop in large scale commercial production. (author)

  9. Different methods of informing the public on projected sites of nuclear generating stations. Results in France

    International Nuclear Information System (INIS)

    Taccoen, L.B.C.

    1977-01-01

    The situation in France of local public opinion concerning nuclear power stations is very different, according to the region in question. It seems that in industrialized regions, where the inhabitants are already familiar with nuclear energy, public opinion is much more open to the installation of new reactors. In regions which are only slightly industrialized, however, the prejudices of the population against nuclear energy can be very strong. This situation is quite serious because it could lead to an even greater widening of the development gap between various regions in France. Electricite de France has thus been led to develop a program of public information concerning the problems of nuclear energy. In practice, this program consists of: a policy of active presence in meeting and debates as well as at the actual site; eventual opening of information centers; and organization of visists of existing nuclear power stations [fr

  10. Gas Stations, US, 2010, NAVTEQ

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Gas_Stations dataset is derived from the Navteq 'AUTOSVC' SDC layer (FAC_TYPE=5540) and contains gas stations and petrol stations. This NAVTEQ dataset is...

  11. Non-Coop Station History (Unindexed)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Station history documentation for stations outside the US Cooperative Observer network. Documents should be compared with those in the Non-Coop Station History...

  12. Single-Station Sigma for the Iranian Strong Motion Stations

    Science.gov (United States)

    Zafarani, H.; Soghrat, M. R.

    2017-11-01

    In development of ground motion prediction equations (GMPEs), the residuals are assumed to have a log-normal distribution with a zero mean and a standard deviation, designated as sigma. Sigma has significant effect on evaluation of seismic hazard for designing important infrastructures such as nuclear power plants and dams. Both aleatory and epistemic uncertainties are involved in the sigma parameter. However, ground-motion observations over long time periods are not available at specific sites and the GMPEs have been derived using observed data from multiple sites for a small number of well-recorded earthquakes. Therefore, sigma is dominantly related to the statistics of the spatial variability of ground motion instead of temporal variability at a single point (ergodic assumption). The main purpose of this study is to reduce the variability of the residuals so as to handle it as epistemic uncertainty. In this regard, it is tried to partially apply the non-ergodic assumption by removing repeatable site effects from total variability of six GMPEs driven from the local, Europe-Middle East and worldwide data. For this purpose, we used 1837 acceleration time histories from 374 shallow earthquakes with moment magnitudes ranging from M w 4.0 to 7.3 recorded at 370 stations with at least two recordings per station. According to estimated single-station sigma for the Iranian strong motion stations, the ratio of event-corrected single-station standard deviation ( Φ ss) to within-event standard deviation ( Φ) is about 0.75. In other words, removing the ergodic assumption on site response resulted in 25% reduction of the within-event standard deviation that reduced the total standard deviation by about 15%.

  13. Central Station Design Options

    DEFF Research Database (Denmark)

    2011-01-01

    . The work identifies the architecture, sizing and siting of prospective Central Stations in Denmark, which can be located at shopping centers, large car parking lots or gas stations. Central Stations are planned to be integrated in the Danish distribution grid. The Danish island of Bornholm, where a high...... overloading, more reference points might be necessary to represent various transformer loading levels. The subject of safety in Central Station is also addressed. A number of safety rules based on European standards apply to AC charging equipment up to 44 kW. The connection interlock and the automatic de......-energization are identified as fundamental requirements for safety in such a charging station. The connection interlock is a solution which ensures that no power is applied to the DC cable when the EV connector is not connected. The automatic de-energization device ensures that whenever a strain on the cable is detected, e...

  14. Fire Protection Engineering Design Brief Template. Hydrogen Refueling Station.

    Energy Technology Data Exchange (ETDEWEB)

    LaFleur, Angela Christine [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Muna, Alice Baca [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Groth, Katrina M. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2015-08-01

    Building a hydrogen infrastructure system is critical to supporting the development of alternate- fuel vehicles. This report provides a methodology for implementing a performance-based design of an outdoor hydrogen refueling station that does not meet specific prescriptive requirements in NFPA 2, The Hydrogen Technologies Code . Performance-based designs are a code-compliant alternative to meeting prescriptive requirements. Compliance is demonstrated by comparing a prescriptive-based fueling station design with a performance-based design approach using Quantitative Risk Assessment (QRA) methods and hydrogen risk assessment tools. This template utilizes the Sandia-developed QRA tool, Hydrogen Risk Analysis Models (HyRAM), which combines reduced-order deterministic models that characterize hydrogen release and flame behavior with probabilistic risk models to quantify risk values. Each project is unique and this template is not intended to account for site-specific characteristics. Instead, example content and a methodology are provided for a representative hydrogen refueling site which can be built upon for new hydrogen applications.

  15. Space station automation and robotics study. Operator-systems interface

    Science.gov (United States)

    1984-01-01

    This is the final report of a Space Station Automation and Robotics Planning Study, which was a joint project of the Boeing Aerospace Company, Boeing Commercial Airplane Company, and Boeing Computer Services Company. The study is in support of the Advanced Technology Advisory Committee established by NASA in accordance with a mandate by the U.S. Congress. Boeing support complements that provided to the NASA Contractor study team by four aerospace contractors, the Stanford Research Institute (SRI), and the California Space Institute. This study identifies automation and robotics (A&R) technologies that can be advanced by requirements levied by the Space Station Program. The methodology used in the study is to establish functional requirements for the operator system interface (OSI), establish the technologies needed to meet these requirements, and to forecast the availability of these technologies. The OSI would perform path planning, tracking and control, object recognition, fault detection and correction, and plan modifications in connection with extravehicular (EV) robot operations.

  16. The Cernavoda project - past and future

    International Nuclear Information System (INIS)

    Glodeanu, F.; Campureanu, T.; Chirica, T.; Popescu, D.

    1995-01-01

    The history of the Cernavoda nuclear power station in Romania is traced. It was conceived in 1977 as five unit CANDU-6 station and agreements were concluded on engineering, procurement and financial assistance with Atomic Energy of Canada Ltd (AECL) and Ansaldo of Italy. Delays in construction were created from the first, however, by efforts to manufacture as many components as possible in Romania, unfamiliarity with nuclear project management and the disadvantages of a highly centralised economy. Political changes since December 1989 have led to a new approach to project implementation. The Romanian Electricity Authority (RENEL), signed a new contract with AECL and Ansaldo in August 1991 to perform the project management for the completion of Cernavoda 1. The project has progressed very well and by the beginning of 1995 more than 90% of the plant systems were ready for commissioning and a full operating shift was in place. As a second phase of the nuclear power programme RENEL plans to complete Cernavoda 2, the construction of which was suspended at 30% completion. The three other units will be preserved in their present preliminary stage of construction up to 2000 while finance is sought for their completion. Nuclear power is seen as an environmentally clean means of meeting Romania's growing energy demand as the economy develops. (UK)

  17. The advanced software development workstation project

    Science.gov (United States)

    Fridge, Ernest M., III; Pitman, Charles L.

    1991-01-01

    The Advanced Software Development Workstation (ASDW) task is researching and developing the technologies required to support Computer Aided Software Engineering (CASE) with the emphasis on those advanced methods, tools, and processes that will be of benefit to support all NASA programs. Immediate goals are to provide research and prototype tools that will increase productivity, in the near term, in projects such as the Software Support Environment (SSE), the Space Station Control Center (SSCC), and the Flight Analysis and Design System (FADS) which will be used to support the Space Shuttle and Space Station Freedom. Goals also include providing technology for development, evolution, maintenance, and operations. The technologies under research and development in the ASDW project are targeted to provide productivity enhancements during the software life cycle phase of enterprise and information system modeling, requirements generation and analysis, system design and coding, and system use and maintenance. On-line user's guides will assist users in operating the developed information system with knowledge base expert assistance.

  18. Enhanced Master Station History Report

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Enhanced Master Station History Report (EMSHR) is a compiled list of basic, historical information for every station in the station history database, beginning...

  19. SPS rectifier stations

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    The first of the twelves SPS rectifier stations for the bending magnets arrived at CERN at the end of the year. The photograph shows a station with the rectifiers on the left and in the other three cubicles the chokes, capacitors and resistor of the passive filter.

  20. 47 CFR 97.109 - Station control.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Station control. 97.109 Section 97.109... SERVICE Station Operation Standards § 97.109 Station control. (a) Each amateur station must have at least one control point. (b) When a station is being locally controlled, the control operator must be at the...

  1. Optimal planning of electric vehicle charging station at the distribution system using hybrid optimization algorithm

    DEFF Research Database (Denmark)

    Awasthi, Abhishek; Venkitusamy, Karthikeyan; Padmanaban, Sanjeevikumar

    2017-01-01

    India's ever increasing population has made it necessary to develop alternative modes of transportation with electric vehicles being the most preferred option. The major obstacle is the deteriorating impact on the utility distribution system brought about by improper setup of these charging...... stations. This paper deals with the optimal planning (siting and sizing) of charging station infrastructure in the city of Allahabad, India. This city is one of the upcoming smart cities, where electric vehicle transportation pilot project is going on under Government of India initiative. In this context......, a hybrid algorithm based on genetic algorithm and improved version of conventional particle swarm optimization is utilized for finding optimal placement of charging station in the Allahabad distribution system. The particle swarm optimization algorithm re-optimizes the received sub-optimal solution (site...

  2. Power station instrumentation

    International Nuclear Information System (INIS)

    Jervis, M.W.

    1993-01-01

    Power stations are characterized by a wide variety of mechanical and electrical plant operating with structures, liquids and gases working at high pressures and temperatures and with large mass flows. The voltages and currents are also the highest that occur in most industries. In order to achieve maximum economy, the plant is operated with relatively small margins from conditions that can cause rapid plant damage, safety implications, and very high financial penalties. In common with other process industries, power stations depend heavily on control and instrumentation. These systems have become particularly significant, in the cost-conscious privatized environment, for providing the means to implement the automation implicit in maintaining safety standards, improving generation efficiency and reducing operating manpower costs. This book is for professional instrumentation engineers who need to known about their use in power stations and power station engineers requiring information about the principles and choice of instrumentation available. There are 8 chapters; chapter 4 on instrumentation for nuclear steam supply systems is indexed separately. (Author)

  3. Design of the LBNF Beamline Target Station

    Energy Technology Data Exchange (ETDEWEB)

    Tariq, S. [Fermilab; Ammigan, K. [Fermilab; Anderson, K.; ; Buccellato, S. A. [Fermilab; Crowley, C. F. [Fermilab; Hartsell, B. D. [Fermilab; Hurh, P. [Fermilab; Hylen, J. [Fermilab; Kasper, P. [Fermilab; Krafczyk, G. E. [Fermilab; Lee, A. [Fermilab; Lundberg, B. [Fermilab; Reitzner, S. D. [Fermilab; Sidorov, V. [Fermilab; Stefanik, A. M. [Fermilab; Tropin, I. S. [Fermilab; Vaziri, K. [Fermilab; Williams, K. [Fermilab; Zwaska, R. M. [Fermilab; Densham, C. [RAL, Didcot

    2016-10-01

    The Long Baseline Neutrino Facility (LBNF) project will build a beamline located at Fermilab to create and aim an intense neutrino beam of appropriate energy range toward the DUNE detectors at the SURF facility in Lead, South Dakota. Neutrino production starts in the Target Station, which consists of a solid target, magnetic focusing horns, and the associated sub-systems and shielding infrastructure. Protons hit the target producing mesons which are then focused by the horns into a helium-filled decay pipe where they decay into muons and neutrinos. The target and horns are encased in actively cooled steel and concrete shielding in a chamber called the target chase. The reference design chase is filled with air, but nitrogen and helium are being evaluated as alternatives. A replaceable beam window separates the decay pipe from the target chase. The facility is designed for initial operation at 1.2 MW, with the ability to upgrade to 2.4 MW, and is taking advantage of the experience gained by operating Fermilab’s NuMI facility. We discuss here the design status, associated challenges, and ongoing R&D and physics-driven component optimization of the Target Station.

  4. NASA Alternate Access to Station Service Concept

    Science.gov (United States)

    Bailey, Michelle D.; Crumbly, Chris

    2001-01-01

    The evolving nature of the NASA space enterprise compels the agency to develop new and innovative space systems concepts. NASA, working with increasingly strained budgets and a declining manpower base, is attempting to transform from operational activities to procurement of commercial services. NASA's current generation reusable launch vehicle, the Shuttle, is in transition from a government owned and operated entity to a commercial venture to reduce the civil servant necessities for that program. NASA foresees its second generation launch vehicles being designed and operated by industry for commercial and government services. The "service" concept is a pioneering effort by NASA. The purpose the "service" is not only to reduce the civil servant overhead but will free up government resources for further research - and enable industry to develop a space business case so that industry can sustain itself beyond government programs. In addition, NASA desires a decreased responsibility thereby decreasing liability. The Second Generation Reusable Launch Vehicle (RLV) program is implementing NASA's Space Launch Initiative (SLI) to enable industry to develop the launch vehicles of the future. The Alternate Access to Station (AAS) project office within this program is chartered with enabling industry to demonstrate an alternate access capability for the International Space Station (ISS). The project will not accomplish this by traditional government procurement methods, not by integrating the space system within the project office, or by providing the only source of business for the new capability. The project funds will ultimately be used to purchase a service to take re-supply cargo to the ISS, much the same as any business might purchase a service from FedEx to deliver a package to its customer. In the near term, the project will fund risk mitigation efforts for enabling technologies. AAS is in some ways a precursor to the 2nd Generation RLV. By accomplishing ISS resupply

  5. NASA Alternate Access to Station Service Concept

    Science.gov (United States)

    Bailey, M. D.; Crumbly, C.

    2002-01-01

    The evolving nature of the NASA space enterprise compels the agency to develop new and innovative space systems concepts. NASA, working with increasingly strained budgets and a declining manpower base, is attempting to transform from operational activities to procurement of commercial services. NASA's current generation reusable launch vehicle, the Shuttle, is in transition from a government owned and operated entity to a commercial venture to reduce the civil servant necessities for that program. NASA foresees its second generation launch vehicles being designed and operated by industry for commercial and government services. The "service" concept is a pioneering effort by NASA. The purpose the "service" is not only to reduce the civil servant overhead but will free up government resources for further research and enable industry to develop a space business case so that industry can sustain itself beyond government programs. In addition, NASA desires a decreased responsibility thereby decreasing liability. The Second Generation Reusable Launch Vehicle (RLV) program is implementing NASA's Space Launch Initiative (SLI) to enable industry to develop the launch vehicles of the future. The Alternate Access to Station (AAS) project office within this program is chartered with enabling industry to demonstrate an alternate access capability for the International Space Station (ISS). The project will not accomplish this by traditional government procurement methods, not by integrating the space system within the project office, or by providing the only source of business for the new capability. The project funds will ultimately be used to purchase a service to take re-supply cargo to the ISS, much the same as any business might purchase a service from FedEx to deliver a package to its customer. In the near term, the project will fund risk mitigation efforts for enabling technologies. AAS is in some ways a precursor to the 2nd Generation RLV. By accomplishing ISS resupply

  6. VLBI2010 in NASA's Space Geodesy Project

    Science.gov (United States)

    Ma, Chopo

    2012-01-01

    In the summer of 20 11 NASA approved the proposal for the Space Geodesy Project (SGP). A major element is developing at the Goddard Geophysical and Astronomical Observatory a prototype of the next generation of integrated stations with co-located VLBI, SLR, GNSS and DORIS instruments as well as a system for monitoring the vector ties. VLBI2010 is a key component of the integrated station. The objectives ofSGP, the role of VLBI20 lOin the context of SGP, near term plans and possible future scenarios will be discussed.

  7. BKE: The catalogue of Bunker-Est Vesuvian station

    International Nuclear Information System (INIS)

    Sarao, A.; Peresan, A.; Vaccari, F.; De Natale, G.; Mariano, A.

    2002-06-01

    A catalogue of 9003 earthquakes associated to the Vesuvian volcano activity as recorded at Bunker Est station (BKE), located on Mt. Vesuvius and operated by the Osservatorio Vesuviano (OV), is presented here. The aim of this catalogue is to integrate the information collected in the catalogue compiled by OV that contains the volcanic earthquakes recorded at station OVO (OVO catalogue) since February 1972. A brief statistical description of the data included in the catalogue BKE and of the empirical relations used for the estimate of the magnitude MBKE from the duration is provided, together with the essential information about the catalogue source. A complete list of the events reported in the catalogue BKE and a description of its format is given in the Appendix. The catalogue BKE has been realized with the cooperation of the University of Trieste - Department of Earth Sciences, the International Centre for Theoretical Physics (ICTP) - Structure and Non-linear Dynamics of the earth (SAND) Group, and the Osservatorio Vesuviano of Naples in the framework of the project 'Eruptive Scenarios from Physical Modeling and Experimental Volcanology' funded by INGV. (author)

  8. Pedestrian evacuation at the subway station under fire

    Science.gov (United States)

    Xiao-Xia, Yang; Hai-Rong, Dong; Xiu-Ming, Yao; Xu-Bin, Sun

    2016-04-01

    With the development of urban rail transit, ensuring the safe evacuation of pedestrians at subway stations has become an important issue in the case of an emergency such as a fire. This paper chooses the platform of line 4 at the Beijing Xuanwumen subway station to study the emergency evacuation process under fire. Based on the established platform, effects of the fire dynamics, different initial pedestrian densities, and positions of fire on evacuation are investigated. According to simulation results, it is found that the fire increases the air temperature and the smoke density, and decreases pedestrians’ visibility and walking velocity. Also, there is a critical initial density at the platform if achieving a safe evacuation within the required 6 minutes. Furthermore, different positions of fire set in this paper have little difference on crowd evacuation if the fire is not large enough. The suggestions provided in this paper are helpful for the subway operators to prevent major casualties. Project supported by the National Natural Science Foundation of China (Grant Nos. 61322307 and 61233001).

  9. Space Station Workshop: Commercial Missions and User Requirements

    Science.gov (United States)

    1988-01-01

    The topics of discussion addressed during a three day workshop on commercial application in space are presented. Approximately half of the program was directed towards an overview and orientation to the Space Station Project; the technical attributes of space; and present and future potential commercial opportunities. The remaining time was spent addressing technological issues presented by previously-formed industry working groups, who attempted to identify the technology needs, problems or issues faced and/or anticipated by the following industries: extraction (mining, agriculture, petroleum, fishing, etc.); fabrication (manufacturing, automotive, aircraft, chemical, pharmaceutical and electronics); and services (communications, transportation and retail robotics). After the industry groups presented their technology issues, the workshop divided into smaller discussion groups composed of: space experts from NASA; academia; industry experts in the appropriate disciplines; and other workshop participants. The needs identified by the industry working groups, space station technical requirements, proposed commercial ventures and other issues related to space commercialization were discussed. The material summarized and reported are the consensus from the discussion groups.

  10. Station Capacity

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    the probability of conflicts and the minimum headway times into account. The last method analyzes how optimal platform tracks are used by examining the arrival and departure pattern of the trains. The developed methods can either be used separately to analyze specific characteristics of the capacity of a station......Stations are often limiting the capacity of railway networks. This is due to extra need of tracks when trains stand still, trains turning around, and conflicting train routes. Although stations are often the capacity bottlenecks, most capacity analysis methods focus on open line capacity. Therefore...... for platform tracks and the probability that arriving trains will not get a platform track immediately at arrival. The third method is a scalable method that analyzes the conflicts in the switch zone(s). In its simplest stage, the method just analyzes the track layout while the more advanced stages also take...

  11. Biopower market impact: Applying advanced technologies to specific needs

    International Nuclear Information System (INIS)

    Gregoire, C.E.; Bain, R.L.; Craig, K.R.

    1994-01-01

    The impact of biopower on the electric power capacity in the United States is projected to increase 5- to 10-fold by the year 2010. A number of competing technologies will likely be available that will provide a variety of advantages for the U.S. economy, from creating jobs in rural areas to increasing the demand for component manufacturing. Biopower also offers environmental advantages over conventional fossil fuel-fired power plants, particularly global climate change benefits. Feedstock type and availability, proximity to users or transmission stations, and markets for potential byproducts will influence which biomass conversion technology is selected and the scale of operation. Cofiring biomass in aging coal-fired power plants represents a near-term alternative for reducing sulfur and CO 2 emissions. Producing biocrude from pyrolysis processes may be suitable for isolated feedstock supplies with high transportation costs or to supply fuel to a single large family in a centralized area. Integrated gasification/combined cycle (IGCC) systems offer high efficiencies and low capital costs. More advanced systems, including fuel cells, will offer additional opportunities for increasing the impact of biopower on the nation's power production

  12. Numerical Simulation of Fluidized Bed Gasifier for Integrated Gasification Combined Cycle

    Directory of Open Access Journals (Sweden)

    CHEN Ju-hui

    2017-06-01

    Full Text Available The overall thermal efficiency of the integrated gasification combined cycle ( IGCC has not been sufficiently improved. In order to achieve higher power generation efficiency,the advanced technology of IGCC has been developed which is on the basis of the concept of exergy recovery. IGCC systems and devices from the overall structure of opinion,this technology will generate electricity for the integration of advanced technology together,the current utilization of power generation technology and by endothermic reaction of steam in the gasifier,a gas turbine exhaust heat recovery or the solid oxide fuel cell. It is estimated that such the use of exergy recycling has the advantage of being easy to use,separating,collecting fixed CO2,making it very attractive,and can increase the overall efficiency by 10% or more. The characteristics of fluidized bed gasifier,one of the core equipment of the IGCC system,and its effect on the whole system were studied.

  13. Decentralized electrification by small-scale hydraulic stations : a viable solution in mountainous regions

    International Nuclear Information System (INIS)

    Dahman Saidi, A.

    1998-01-01

    The installation of a small-scale hydroelectric generating station to supply electricity to the small community of Takordmi in Morocco was described. The community of Takordmi consists of 32 households located in the remote mountainous region of Morocco. Takordmi was without electrical power until 1992 when a small 15 kW Pelton turbine was installed to supply electricity to the residents. Water to power the turbine generator was supplied by a small stream with an output of 4 to 8 liters per second and a head of 535 meters. Since the unit was installed, the mean monthly consumption of the community has been only 115 kWh, which averages to 4 kWh per household. The success of the Takordmi project has prompted the electrification of several other small communities in the remote regions of Morocco either by similar micro-hydroelectric stations or by photovoltaic cells. This project, funded by the Republic of Austria, demonstrates that it is feasible to provide electricity to remote rural communities by using local sources of power. 3 figs

  14. Thermal battery automated assembly station conceptual design

    Energy Technology Data Exchange (ETDEWEB)

    Jacobs, D

    1988-08-01

    Thermal battery assembly involves many operations which are labor- intense. In August 1986, a project team was formed at GE Neutron Devices to investigate and evaluate more efficient and productive battery assembly techniques through the use of automation. The result of this study was the acceptance of a plan to automate the piece part pellet fabrication and battery stacking operations by using computerized pellet presses and robots which would be integrated by a main computer. This report details the conceptual design and development plan to be followed in the fabrication, development, and implementation of a thermal battery automated assembly station. 4 figs., 8 tabs.

  15. Data communications method for mobile network in fourth generation communications system, involves delivering decoded data to mobile station from relay station, where mobile station receives data from both relay and base stations

    DEFF Research Database (Denmark)

    2008-01-01

    The method involves utilizing a base station (BS) (100) to transmit data to a relay station (RS) (110) and a mobile station (MS) (120), where the data includes two messages. The BS is utilized to transmit the two messages by utilizing a linear combination method, and the data is received in the RS...

  16. Nuclear power: Financing big projects

    International Nuclear Information System (INIS)

    Raabe, G.

    1992-01-01

    Since the early seventies, the Dresdner Bank AG has been intensively engaged in financing nuclear power plants, e.g., the Muelheim-Kaerlich Nuclear Power Station currently down because of legal technicaltities. The bank has also been involved in other large-scale projects in the energy sector and, in addition, has conceptually accompanied the stages of the nuclear fuel cycle, such as enrichment, fuel element fabrication, and reprocessing. However, for political reasons it has not been possible to carry out these projects and finance them in the Federal Republic. With appropriate modifications, these financial models can also be transferred to international projects; after all, the enrichment sector has always been characterized by trilateral ventures. (orig.) [de

  17. Efficient erection of a piping unit in a nuclear power station

    International Nuclear Information System (INIS)

    Halstrick, V.; Peters, G.

    1986-01-01

    In consideration of the negative experience gathered in the past extensive project logistics are required for the erection of piping units in a nuclear power station in order to be able to recognize and master the numerous influences and different marginal conditions with reasonable certainty and at an early stage. The utilization of requirements from the analysis of experience for the conception of project management begins with the erection planning and results in check lists for the execution of erection. During production planning these check lists are verified for realization. Because of the extensive data, EDP-aided systems are applied for checking and controlling the flow of information and material. A dialogue-aided system is presented for project planning and controlling which enables a transparent and farsighted execution of a project. By means of comparable piping units it is demonstrated that due to the created controlling system a great success becomes obvious in relation to the past. (orig.) [de

  18. Recovery Act Hospital Alteration Project at Naval Air Station Jacksonville

    Science.gov (United States)

    2010-12-07

    QMAD Quantitative Methods and Analysis Division RLF Rogers Lovelock & Fritz, Incorporated SE Southeast SF Square Feet SOW Statement of Work TMA TRICARE...Finally, the contractor, Rogers Lovelock & Fritz, Incorporated, reported the recipient information required by the Recovery Act. What We Recommend...contractor, Rogers Lovelock & Fritz, Incorporated (RLF), reported the recipient information required by the Recovery Act. Planning: Initially, Project

  19. Waste Transfer Stations

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund

    2011-01-01

    tion and transport is usually the most costly part of any waste management system; and when waste is transported over a considerable distance or for a long time, transferring the waste from the collection vehicles to more efficient transportation may be economically beneficial. This involves...... a transfer station where the transfer takes place. These stations may also be accessible by private people, offering flexibility to the waste system, including facilities for bulky waste, household hazardous waste and recyclables. Waste transfer may also take place on the collection route from small...... describes the main features of waste transfer stations, including some considerations about the economical aspects on when transfer is advisable....

  20. Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report

    International Nuclear Information System (INIS)

    Johansen, R.

    2011-01-01

    Summary report for Fiscal Year 2011 activities associated with the Constellation Pilot Project. The project is a joint effor between Constellation Nuclear Energy Group (CENG), EPRI, and the DOE Light Water Reactor Sustainability Program. The project utilizes two CENG reactor stations: R.E. Ginna and Nine Point Unit 1. Included in the report are activities associate with reactor internals and concrete containments.