WorldWideScience

Sample records for station development test

  1. Development of Test Protocols for International Space Station Particulate Filters

    Science.gov (United States)

    Vijayakumar, R.; Green, Robert D.; Agui, Juan H.

    2015-01-01

    Air quality control on the International Space Station (ISS) is a vital requirement for maintaining a clean environment for the crew and the hardware. This becomes a serious challenge in pressurized space compartments since no outside air ventilation is possible, and a larger particulate load is imposed on the filtration system due to lack of gravitational settling. The ISS Environmental Control and Life Support System (ECLSS) uses a filtration system that has been in use for over 14 years and has proven to meet this challenge. The heart of this system is a traditional High-Efficiency Particulate Air (HEPA) filter configured to interface with the rest of the life support elements and provide effective cabin filtration. The filter element for this system has a non-standard cross-section with a length-to-width ratio (LW) of 6.6. A filter test setup was designed and built to meet industry testing standards. A CFD analysis was performed to initially determine the optimal duct geometry and flow configuration. Both a screen and flow straighter were added to the test duct design to improve flow uniformity and face velocity profiles were subsequently measured to confirm. Flow quality and aerosol mixing assessments show that the duct flow is satisfactory for the intended leak testing. Preliminary leak testing was performed on two different ISS filters, one with known perforations and one with limited use, and results confirmed that the testing methods and photometer instrument are sensitive enough to detect and locate compromised sections of an ISS BFE.Given the engineering constraints in designing spacecraft life support systems, it is anticipated that non-industry standard filters will be required in future designs. This work is focused on developing test protocols for testing the ISS BFE filters, but the methodology is general enough to be extended to other present and future spacecraft filters. These techniques for characterizing the test duct and perform leak testing

  2. Materials Test Station

    Data.gov (United States)

    Federal Laboratory Consortium — When completed, the Materials Test Station at the Los Alamos Neutron Science Center will meet mission need. MTS will provide the only fast-reactor-like irradiation...

  3. Local control station for development, testing and maintenance of mirror fusion facility subsystem controls

    International Nuclear Information System (INIS)

    Ables, E.; Kelly, M.F.

    1985-01-01

    A Local Control Station (LCS) was designed and built to provide a simplified ad easily configurable means of controlling any Mirror Fusion Test Facility (MFTF-B) subsystem for the purpose of development, testing and maintenance of the subsystem. All MFTF-B Subsystems incorporate at least one Local Control Computer (LCC) that is connected to and accepts high level commands from one of the Supervisory Control and Diagnostic System (SCDS) computers. The LCS connects directly to the LCC in place of SCDS. The LCS communicates with the subsystem hardware using the same SCDS commands that the local control computer recognizes and as such requires no special configuration of the LCC

  4. Space Station propulsion - Advanced development testing of the water electrolysis concept at MSFC

    Science.gov (United States)

    Jones, Lee W.; Bagdigian, Deborah R.

    1989-01-01

    The successful demonstration at Marshall Space Flight Center (MSFC) that the water electrolysis concept is sufficiently mature to warrant adopting it as the baseline propulsion design for Space Station Freedom is described. In particular, the test results demonstrated that oxygen/hydrogen thruster, using gaseous propellants, can deliver more than two million lbf-seconds of total impulse at mixture ratios of 3:1 to 8:1 without significant degradation. The results alao demonstrated succcessful end-to-end operation of an integrated water electrolysis propulsion system.

  5. The Need and Opportunity for an Integrated Research, Development and Testing Station in the Alaskan High Arctic

    Science.gov (United States)

    Hardesty, J. O.; Ivey, M.; Helsel, F.; Dexheimer, D.; Cahill, C. F.; Bendure, A.; Lucero, D. A.; Roesler, E. L.

    2016-12-01

    This presentation will make the case for development of a permanent integrated research and testing station at Oliktok Point, Alaska; taking advantage of existing assets and infrastructure, controlled airspace, an active UAS program and local partnerships. Arctic research stations provide critical monitoring and research on climate change for conditions and trends in the Arctic. The US Chair of the Arctic Council has increased awareness of gaps in our understanding of Artic systems, scarce monitoring, lack of infrastructure and readiness for emergency response. Less sea ice brings competition for commercial shipping and resource extraction. Search and rescue, pollution mitigation and safe navigation need real-time, wide-area monitoring to respond to events. Multi-national responses for international traffic will drive a greater security presence to protect citizens and sovereign interests. To address research and technology gaps, there is a national need for a High Arctic Station with an approach that partners stakeholders from science, safety and security to develop comprehensive solutions. The Station should offer year-round use, logistic support and access to varied ecological settings; phased adaptation to changing needs; and support testing of technologies such as multiple autonomous platforms, renewable energies and microgrids, and sensors in Arctic settings. We propose an Arctic Station at Oliktok Point, Alaska. Combined with the Toolik Field Station and Barrow Environmental Observatory, they form a US network of Arctic Stations. An Oliktok Point Station can provide complementary and unique assets that include: ocean access, and coastal and terrestrial systems; road access; controlled airspaces on land and ocean; nearby air facilities, medical and logistic support; atmospheric observations from an adjacent ARM facility; connections to Barrow and Toolik; fiber-optic communications; University of Alaska Fairbanks UAS Test Facility partnership; and an airstrip

  6. The development of test beds to support the definition and evolution of the Space Station Freedom power system

    Science.gov (United States)

    Soeder, James F.; Frye, Robert J.; Phillips, Rudy L.

    1991-01-01

    Since the beginning of the Space Station Freedom Program (SSFP), the NASA Lewis Research Center (LeRC) and the Rocketdyne Division of Rockwell International have had extensive efforts underway to develop testbeds to support the definition of the detailed electrical power system design. Because of the extensive redirections that have taken place in the Space Station Freedom Program in the past several years, the test bed effort was forced to accommodate a large number of changes. A short history of these program changes and their impact on the LeRC test beds is presented to understand how the current test bed configuration has evolved. The current test objectives and the development approach for the current DC test bed are discussed. A description of the test bed configuration, along with its power and controller hardware and its software components, is presented. Next, the uses of the test bed during the mature design and verification phase of SSFP are examined. Finally, the uses of the test bed in the operation and evolution of the SSF are addressed.

  7. Development and Certification of Ultrasonic Background Noise Test (UBNT) System for use on the International Space Station (ISS)

    Science.gov (United States)

    Prosser, William H.; Madaras, Eric I.

    2011-01-01

    As a next step in the development and implementation of an on-board leak detection and localization system on the International Space Station (ISS), there is a documented need to obtain measurements of the ultrasonic background noise levels that exist within the ISS. This need is documented in the ISS Integrated Risk Management System (IRMA), Watch Item #4669. To address this, scientists and engineers from the Langley Research Center (LaRC) and the Johnson Space Center (JSC), proposed to the NASA Engineering and Safety Center (NESC) and the ISS Vehicle Office a joint assessment to develop a flight package as a Station Development Test Objective (SDTO) that would perform ultrasonic background noise measurements within the United States (US) controlled ISS structure. This document contains the results of the assessment

  8. Development and qualification of a thermal-hydraulic nodalization for modeling station blackout accident in PSB-VVER test facility

    Energy Technology Data Exchange (ETDEWEB)

    Saghafi, Mahdi [Department of Energy Engineering, Sharif University of Technology, Azadi Avenue, Tehran (Iran, Islamic Republic of); Ghofrani, Mohammad Bagher, E-mail: ghofrani@sharif.edu [Department of Energy Engineering, Sharif University of Technology, Azadi Avenue, Tehran (Iran, Islamic Republic of); D’Auria, Francesco [San Piero a Grado Nuclear Research Group (GRNSPG), University of Pisa, Via Livornese 1291, San Piero a Grado, Pisa (Italy)

    2016-07-15

    Highlights: • A thermal-hydraulic nodalization for PSB-VVER test facility has been developed. • Station blackout accident is modeled with the developed nodalization in MELCOR code. • The developed nodalization is qualified at both steady state and transient levels. • MELCOR predictions are qualitatively and quantitatively in acceptable range. • Fast Fourier Transform Base Method is used to quantify accuracy of code predictions. - Abstract: This paper deals with the development of a qualified thermal-hydraulic nodalization for modeling Station Black-Out (SBO) accident in PSB-VVER Integral Test Facility (ITF). This study has been performed in the framework of a research project, aiming to develop an appropriate accident management support tool for Bushehr nuclear power plant. In this regard, a nodalization has been developed for thermal-hydraulic modeling of the PSB-VVER ITF by MELCOR integrated code. The nodalization is qualitatively and quantitatively qualified at both steady-state and transient levels. The accuracy of the MELCOR predictions is quantified in the transient level using the Fast Fourier Transform Base Method (FFTBM). FFTBM provides an integral representation for quantification of the code accuracy in the frequency domain. It was observed that MELCOR predictions are qualitatively and quantitatively in the acceptable range. In addition, the influence of different nodalizations on MELCOR predictions was evaluated and quantified using FFTBM by developing 8 sensitivity cases with different numbers of control volumes and heat structures in the core region and steam generator U-tubes. The most appropriate case, which provided results with minimum deviations from the experimental data, was then considered as the qualified nodalization for analysis of SBO accident in the PSB-VVER ITF. This qualified nodalization can be used for modeling of VVER-1000 nuclear power plants when performing SBO accident analysis by MELCOR code.

  9. Materials International Space Station Experiment (MISSE) 5 Developed to Test Advanced Solar Cell Technology Aboard the ISS

    Science.gov (United States)

    Wilt, David M.

    2004-01-01

    The testing of new technologies aboard the International Space Station (ISS) is facilitated through the use of a passive experiment container, or PEC, developed at the NASA Langley Research Center. The PEC is an aluminum suitcase approximately 2 ft square and 5 in. thick. Inside the PEC are mounted Materials International Space Station Experiment (MISSE) plates that contain the test articles. The PEC is carried to the ISS aboard the space shuttle or a Russian resupply vehicle, where astronauts attach it to a handrail on the outer surface of the ISS and deploy the PEC, which is to say the suitcase is opened 180 deg. Typically, the PEC is left in this position for approximately 1 year, at which point astronauts close the PEC and it is returned to Earth. In the past, the PECs have contained passive experiments, principally designed to characterize the durability of materials subjected to the ultraviolet radiation and atomic oxygen present at the ISS orbit. The MISSE5 experiment is intended to characterize state-of-art (SOA) and beyond photovoltaic technologies.

  10. Testing EDM of Total Stations

    Directory of Open Access Journals (Sweden)

    Cirbus Ján

    2001-03-01

    Full Text Available The paper is devoted to testing electrooptical distance measuring devices (EDM built in total stations, than can be used for various tasks in the contemporary geodetic works. A rich market offer and availability of these universal measuring systems with satisfying distance range, excellent accuracy and other parameters, make total stations as dominant terrestrial geodetic instruments.For succesfully applying these instruments, above all for relliable distance measurements, the stability of the modulation frequency is the most important pre-condition. In the article, therefore, there are given some methods to verify the modulation frequency stability. In addition, some ways for determining the EDM distance constant and periodical corrections of the phase measuring unit are introduced for 4 types of EDM : LEICA 1700L, TOPCON GTS6A, TOPCON GTS2, C.ZEISS ELTA50. It were also investigated their possibilities for precise distance survey. Values of the determined constants and periodical corrections are presented in Tab. 2.Based on the investigation results of the 4 EDM types and using the values m obtained for different distances S, equations of the a posteriori standard deviations in form : m = (a+b.S were derived too.

  11. Developments of space station; Uchu station no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Hashimoto, H. [National Space Development Agency of Japan, Tokyo (Japan)

    1996-03-05

    This paper introduces the Japanese experiment module (JEM) in developing a space station. The JEM consists of systems of a pressurizing section, an exposure section, a pressurizing portion of a supply section, a manipulator and an exposure portion of the supply section. The pressurizing section circulates and controls air so that crews can perform experiments under pressurized environment. The exposure section is a part in which experiments are carried out under exposure environment. The supply section runs between a station and the ground, with required devices loaded on it. The manipulator performs attaching a payload for the exposure section and replaces experimental samples. The JEM undergoes a schedule of fabricating an engineering model, testing for a certification a prototype flight model, and putting the model on a flight. The pressurizing section, exposure section and manipulator are at the stage of system tests. Surveillance of the JEM and control of the experiments are carried out at the Tsukuba Space Center. The Center is composed of a space experiment building, a zero-gravity environment testing building, an astronaut training building, a space station operating building, and a space station testing building. 7 figs., 2 tabs.

  12. Reload Startup Physics Tests for Tianwan Nuclear Power station

    International Nuclear Information System (INIS)

    Yang Xiaoqiang; Li Wenshuang; Li Youyi; Yao Jinguo; Li Zaipeng Jiangsu

    2010-01-01

    This paper briefly describes the test purposes, test items, test schedules and test equipment's for reload startup physics test's on Unit 1 and 2 of Tianwan Nuclear Power station. Then, an overview of the previous thrice tests and evaluations on the tests results are presented. In the end, the paper shows the development and work direction of optimization project for reload startup physics tests on Unit 1 and 2 of Tianwan Nuclear Power station. (Authors)

  13. 75 FR 22674 - Moynihan Station Development Project

    Science.gov (United States)

    2010-04-29

    ... DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Moynihan Station Development Project... availability of and public comment period for the Moynihan Station Development Project Environmental Assessment... 22675

  14. Development of Flow Boiling and Condensation Experiment on the International Space Station- Normal and Low Gravity Flow Boiling Experiment Development and Test Results

    Science.gov (United States)

    Nahra, Henry K.; Hall, Nancy R.; Hasan, Mohammad M.; Wagner, James D.; May, Rochelle L.; Mackey, Jeffrey R.; Kolacz, John S.; Butcher, Robert L.; Frankenfield, Bruce J.; Mudawar, Issam; hide

    2013-01-01

    Flow boiling and condensation have been identified as two key mechanisms for heat transport that are vital for achieving weight and volume reduction as well as performance enhancement in future space systems. Since inertia driven flows are demanding on power usage, lower flows are desirable. However, in microgravity, lower flows are dominated by forces other than inertia (like the capillary force). It is of paramount interest to investigate limits of low flows beyond which the flow is inertial enough to be gravity independent. One of the objectives of the Flow Boiling and Condensation Flight Experiment sets to investigate these limits for flow boiling and condensation. A two-phase flow loop consisting of a Flow Boiling Module and two Condensation Modules has been developed to experimentally study flow boiling condensation heat transfer in the reduced gravity environment provided by the reduced gravity platform. This effort supports the development of a flow boiling and condensation facility for the International Space Station (ISS). The closed loop test facility is designed to deliver the test fluid, FC-72 to the inlet of any one of the test modules at specified thermodynamic and flow conditions. The zero-g-aircraft tests will provide subcooled and saturated flow boiling critical heat flux and flow condensation heat transfer data over wide range of flow velocities. Additionally, these tests will verify the performance of all gravity sensitive components, such as evaporator, condenser and accumulator associated with the two-phase flow loop. We will present in this paper the breadboard development and testing results which consist of detailed performance evaluation of the heater and condenser combination in reduced and normal gravity. We will also present the design of the reduced gravity aircraft rack and the results of the ground flow boiling heat transfer testing performed with the Flow Boiling Module that is designed to investigate flow boiling heat transfer and

  15. The development and testing of a volatile organics concentrator for use in monitoring Space Station water quality

    Science.gov (United States)

    Bodek, Itamar; Ehntholt, Daniel J.; Stolki, Thomas J.; Trabanino, Rudy; Hinsdale, Lloyd; Webb, Johanna; Sauer, Richard L.

    1992-01-01

    The Volatile Organics Concentrator (VOC) system, designed to attach to a gas chromatograph/mass spectrometer (GC/MS) for the analyses of volatile organic compounds in water on Space Station Freedom, is described. Organic volatiles are collected and concentrated in the VOC by means of two primary solid sorbent tubes and desorbed into the GC/MS system. The paper describes the results of testing the VOC breadboard using a GC/MS system. Evaluations performed on 39 organic compounds recovered from water samples were compared with data for these compounds using direct injection/GC/MS and purge and trap/GC/MS procedures. The results demonstrate that the VOC/GC/MS system's detection limits for the 39 compounds analyzed are comparable to those of the EPA Method 524.2, and for many compounds reaching a factor of 5 lower.

  16. Automation for a base station stability testing

    OpenAIRE

    Punnek, Elvis

    2016-01-01

    This Batchelor’s thesis was commissioned by Oy LM Ericsson Ab Oulu. The aim of it was to help to investigate and create a test automation solution for the stability testing of the LTE base station. The main objective was to create a test automation for a predefined test set. This test automation solution had to be created for specific environments and equipment. This work included creating the automation for the test cases and putting them to daily test automation jobs. The key factor...

  17. Probe station for testing of ALICE silicon drift detectors

    CERN Document Server

    Humanic, T J; Piemonte, C; Rashevsky, A; Sugarbaker, E R; Vacchi, A

    2003-01-01

    Large area, 7.25 cm multiplied by 8.76 cm silicon drift detectors have been developed and are in production for the ALICE experiment at LHC. An active area of the detector of more than 50 cm**2 imposes high demands on the quality of processing and raw material. Automated testing procedures have been developed to test detectors before mounting them on the ladders. Probe stations for ALICE SDD testing were designed and built at INFN, Trieste and Ohio State University (OSU). Testing procedures, detector selection criteria and some details of the OSU probe station design are discussed.

  18. Fuel Cell Stations Automate Processes, Catalyst Testing

    Science.gov (United States)

    2010-01-01

    Glenn Research Center looks for ways to improve fuel cells, which are an important source of power for space missions, as well as the equipment used to test fuel cells. With Small Business Innovation Research (SBIR) awards from Glenn, Lynntech Inc., of College Station, Texas, addressed a major limitation of fuel cell testing equipment. Five years later, the company obtained a patent and provided the equipment to the commercial world. Now offered through TesSol Inc., of Battle Ground, Washington, the technology is used for fuel cell work, catalyst testing, sensor testing, gas blending, and other applications. It can be found at universities, national laboratories, and businesses around the world.

  19. A probe station for testing silicon sensors

    CERN Multimedia

    Ulysse, Fichet

    2017-01-01

    A probe station for testing silicon sensors. The probe station is located inside a dark box that can keep away light during the measurement. The set-up is located in the DSF (Department Silicon Facility). The golden plate is the "chuck" where the sensor is usually placed on. With the help of "manipulators", thin needles can be precisely positioned that can contact the sensor surface. Using these needles and the golden chuck, a high voltage can be applied to the sensor to test its behaviour under high voltage. We will use the silicon sensors that we test here for building prototypes of a highly granular sandwich calorimeter, the CMS HGC (Highly granular Calorimeter) upgrade for High-Luminosity LHC.

  20. Weigh Station and Grid Plate Testing

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test is to verify that the Shortened Fuel Canister Hook with Certified Scale (i.e. Weigh Station) can be used to weigh an empty canister from the Canister Well and the empty Primary Cleaning Machine (PCM) Strainer Basket from the process table. Drawing H-1-84835, ''Canister Handling Hook for Fuel Retrieval System Process Table,'' provides details of the Shortened Fuel Canister Hook. It is also necessary to verify that the grid plate can be lifted and tilted over a canister in the canister well. This testing shall be performed before N Reactor fuel is processed through the FRS in Phase 3. The Phase 3 Test will repeatedly weigh fuel and scrap canisters and the PCM strainer basket containing N Reactor fuel (Pajunen, et. al, 2000). Advance testing of this weigh station will ensure that accurate fuel weight data can be recorded in the Phase 3 Test. This document satisfies the requirements EN-6-031-00, ''Testing Process'' for a test plan, test specification and test procedure

  1. Severe Accident Test Station Design Document

    Energy Technology Data Exchange (ETDEWEB)

    Snead, Mary A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Yan, Yong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howell, Michael [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Keiser, James R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Terrani, Kurt A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    The purpose of the ORNL severe accident test station (SATS) is to provide a platform for evaluation of advanced fuels under projected beyond design basis accident (BDBA) conditions. The SATS delivers the capability to map the behavior of advanced fuels concepts under accident scenarios across various temperature and pressure profiles, steam and steam-hydrogen gas mixtures, and thermal shock. The overall facility will include parallel capabilities for examination of fuels and irradiated materials (in-cell) and non-irradiated materials (out-of-cell) at BDBA conditions as well as design basis accident (DBA) or loss of coolant accident (LOCA) conditions. Also, a supporting analytical infrastructure to provide the data-needs for the fuel-modeling components of the Fuel Cycle Research and Development (FCRD) program will be put in place in a parallel manner. This design report contains the information for the first, second and third phases of design and construction of the SATS. The first phase consisted of the design and construction of an out-of-cell BDBA module intended for examination of non-irradiated materials. The second phase of this work was to construct the BDBA in-cell module to test irradiated fuels and materials as well as the module for DBA (i.e. LOCA) testing out-of-cell, The third phase was to build the in-cell DBA module. The details of the design constraints and requirements for the in-cell facility have been closely captured during the deployment of the out-of-cell SATS modules to ensure effective future implementation of the in-cell modules.

  2. Severe Accident Test Station Design Document

    International Nuclear Information System (INIS)

    Snead, Mary A.; Yan, Yong; Howell, Michael; Keiser, James R.; Terrani, Kurt A.

    2015-01-01

    The purpose of the ORNL severe accident test station (SATS) is to provide a platform for evaluation of advanced fuels under projected beyond design basis accident (BDBA) conditions. The SATS delivers the capability to map the behavior of advanced fuels concepts under accident scenarios across various temperature and pressure profiles, steam and steam-hydrogen gas mixtures, and thermal shock. The overall facility will include parallel capabilities for examination of fuels and irradiated materials (in-cell) and non-irradiated materials (out-of-cell) at BDBA conditions as well as design basis accident (DBA) or loss of coolant accident (LOCA) conditions. Also, a supporting analytical infrastructure to provide the data-needs for the fuel-modeling components of the Fuel Cycle Research and Development (FCRD) program will be put in place in a parallel manner. This design report contains the information for the first, second and third phases of design and construction of the SATS. The first phase consisted of the design and construction of an out-of-cell BDBA module intended for examination of non-irradiated materials. The second phase of this work was to construct the BDBA in-cell module to test irradiated fuels and materials as well as the module for DBA (i.e. LOCA) testing out-of-cell, The third phase was to build the in-cell DBA module. The details of the design constraints and requirements for the in-cell facility have been closely captured during the deployment of the out-of-cell SATS modules to ensure effective future implementation of the in-cell modules.

  3. High temperature and pressure electrochemical test station

    DEFF Research Database (Denmark)

    Chatzichristodoulou, Christodoulos; Allebrod, Frank; Mogensen, Mogens Bjerg

    2013-01-01

    An electrochemical test station capable of operating at pressures up to 100 bars and temperatures up to 400 ◦C has been established. It enables control of the partial pressures and mass flow of O2, N2, H2, CO2, and H2O in a single or dual environment arrangement, measurements with highly corrosive...... media, as well as localized sampling of gas evolved at the electrodes for gas analysis. A number of safety and engineering design challenges have been addressed. Furthermore, we present a series of electrochemical cell holders that have been constructed in order to accommodate different types of cells...... and facilitate different types of electrochemical measurements. Selected examples of materials and electrochemical cells examined in the test station are provided, ranging from the evaluation of the ionic conductivity of liquid electrolytic solutions immobilized in mesoporous ceramic structures...

  4. Development and Certification of Station Development Test Objective (SDTO) Experiment # 15012-U, "Near RealTime Water Quality Monitoring Demonstration for ISS Biocides Using Colorimetric Solid Phase Extraction (CSPE)"

    Science.gov (United States)

    Gazda, Daniel B.; Nolan, Daniel J.; Rutz, Jeffrey A.; Shcultz, John R.; Siperko, Lorraine M.; Porter, Marc D,; Lipert, Robert J.; Limardo, Jose G.; McCoy, J. Torin

    2009-01-01

    Scientists and engineers from the Wyle Integrated Science and Engineering Group are working with researchers at the University of Utah and Iowa State University to develop and certify an experimental water quality monitoring kit based on Colorimetric Solid Phase Extraction (CSPE). The kit will be launched as a Station Development Test Objective (SDTO) experiment and evaluated on the International Space Station (ISS) to determine the acceptability of CSPE technology for routine inflight water quality monitoring. Iodine and silver, the biocides used in the US and Russian on-orbit water systems, will serve as test analytes for the technology evaluation. This manuscript provides an overview of the CSPE SDTO experiment and details the development and certification of the experimental water quality monitoring kit. Initial results from reagent and standard solution stability testing and environmental testing performed on the kit hardware are also reported.

  5. Plasma contactor development for Space Station

    Science.gov (United States)

    Patterson, Michael J.; Hamley, John A.; Sarmiento, Charles J.; Manzella, David H.; Sarver-Verhey, Timothy; Soulas, George C.; Nelson, Amy

    1993-01-01

    Plasma contactors have been baselined for the Space Station (SS) to control the electrical potentials of surfaces to eliminate/mitigate damaging interactions with the space environment. The system represents a dual-use technology which is a direct outgrowth of the NASA electric propulsion program and, in particular, the technology development effort on ion thrustor systems. The plasma contactor subsystems include the plasma contactor unit, a power electronics unit, and an expellant management unit. Under this pre-flight development program these will all be brought to breadboard or engineering model status. Development efforts for the plasma contactor include optimizing the design and configuration of the contactor, validating its required lifetime, and characterizing the contactor plume and electromagnetic interference. The plasma contactor unit design selected for the SS is an enclosed keeper, xenon hollow cathode plasma source. This paper discusses the test results and development status of the plasma contactor unit subsystem for the SS.

  6. Lewis Research Center space station electric power system test facilities

    Science.gov (United States)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  7. Central station market development strategies for photovoltaics

    Science.gov (United States)

    1980-01-01

    Federal market development strategies designed to accelerate the market penetration of central station applications of photovoltaic energy system are analyzed. Since no specific goals were set for the commercialization of central station applications, strategic principles are explored which, when coupled with specific objectives for central stations, can produce a market development implementation plan. The study includes (1) background information on the National Photovoltaic Program, photovoltaic technology, and central stations; (2) a brief market assessment; (3) a discussion of the viewpoints of the electric utility industry with respect to solar energy; (4) a discussion of commercialization issues; and (5) strategy principles. It is recommended that a set of specific goals and objectives be defined for the photovoltaic central station program, and that these goals and objectives evolve into an implementation plan that identifies the appropriate federal role.

  8. System Studies for the ADTF: Target and Materials Test Station

    International Nuclear Information System (INIS)

    Cappiello, M.; Pitcher, E.; Pasamehmetoglu, K.

    2002-01-01

    fuels and materials at prototypic flux, temperature and coolant conditions (requires intense source of fast neutrons). - Provide significant throughput of irradiated fuel for separations testing at adequate scale. - Use the target technology demonstrated in the TMT. - Test and demonstrate the safe coupling and operation of an accelerator driven subcritical multiplier. - Perform neutron physics experiments. By its nature, the TMT neutron source is driven by the spallation process. The amount of fuel to be tested is small and will offer little or no multiplication. The SCM however is a 100-MW capable subcritical reactor. The neutron source in this case is derived primarily from the fissioning of fuel. The remainder of this paper focuses on the description of the TMT station and the scoping analyses that have been performed to support the pre-conceptual design. The SCM development is discussed in a separate paper. (authors)

  9. Severe Accident Test Station Activity Report

    Energy Technology Data Exchange (ETDEWEB)

    Pint, Bruce A [ORNL; Terrani, Kurt A [ORNL

    2015-06-01

    Enhancing safety margins in light water reactor (LWR) severe accidents is currently the focus of a number of international R&D programs. The current UO2/Zr-based alloy fuel system is particularly susceptible since the Zr-based cladding experiences rapid oxidation kinetics in steam at elevated temperatures. Therefore, alternative cladding materials that offer slower oxidation kinetics and a smaller enthalpy of oxidation can significantly reduce the rate of heat and hydrogen generation in the core during a coolant-limited severe accident. In the U.S. program, the high temperature steam oxidation performance of accident tolerant fuel (ATF) cladding solutions has been evaluated in the Severe Accident Test Station (SATS) at Oak Ridge National Laboratory (ORNL) since 2012. This report summarizes the capabilities of the SATS and provides an overview of the oxidation kinetics of several candidate cladding materials. A suggested baseline for evaluating ATF candidates is a two order of magnitude reduction in the steam oxidation resistance above 1000ºC compared to Zr-based alloys. The ATF candidates are categorized based on the protective external oxide or scale that forms during exposure to steam at high temperature: chromia, alumina, and silica. Comparisons are made to literature and SATS data for Zr-based alloys and other less-protective materials.

  10. Mobile and modular. BGR develops seismological monitoring stations for universal applications

    International Nuclear Information System (INIS)

    Hinz, Erwin; Hanneken, Mark

    2016-01-01

    BGR seismologists often set up monitoring stations for testing purposes. The engineers from the Central Seismological Observatory have now developed a new type of mobile monitoring station which can be remotely controlled.

  11. Space station high gain antenna concept definition and technology development

    Science.gov (United States)

    Wade, W. D.

    1972-01-01

    The layout of a technology base is reported from which a mechanically gimballed, directional antenna can be developed to support a manned space station proposed for the late 1970's. The effort includes the concept definition for the antenna assembly, an evaluation of available technology, the design of critical subassemblies and the design of critical subassembly tests.

  12. Design, Development and Pre-Flight Testing of the Communications, Navigation, and Networking Reconfigurable Testbed (Connect) to Investigate Software Defined Radio Architecture on the International Space Station

    Science.gov (United States)

    Over, Ann P.; Barrett, Michael J.; Reinhart, Richard C.; Free, James M.; Cikanek, Harry A., III

    2011-01-01

    The Communication Navigation and Networking Reconfigurable Testbed (CoNNeCT) is a NASA-sponsored mission, which will investigate the usage of Software Defined Radios (SDRs) as a multi-function communication system for space missions. A softwaredefined radio system is a communication system in which typical components of the system (e.g., modulators) are incorporated into software. The software-defined capability allows flexibility and experimentation in different modulation, coding and other parameters to understand their effects on performance. This flexibility builds inherent redundancy and flexibility into the system for improved operational efficiency, real-time changes to space missions and enhanced reliability/redundancy. The CoNNeCT Project is a collaboration between industrial radio providers and NASA. The industrial radio providers are providing the SDRs and NASA is designing, building and testing the entire flight system. The flight system will be integrated on the Express Logistics Carrier (ELC) on the International Space Station (ISS) after launch on the H-IIB Transfer Vehicle in 2012. This paper provides an overview of the technology research objectives, payload description, design challenges and pre-flight testing results.

  13. Steam Oxidation Testing in the Severe Accident Test Station

    Energy Technology Data Exchange (ETDEWEB)

    Pint, Bruce A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-08-01

    After the March 2011 accident at Fukushima Daiichi, Oak Ridge National Laboratory (ORNL) began conducting high temperature steam oxidation testing of candidate materials for accident tolerant fuel (ATF) cladding in August 2011 [1-11]. The ATF concept is to enhance safety margins in light water reactors (LWR) during severe accident scenarios by identifying materials with 100× slower steam oxidation rates compared to current Zr-based alloys. In 2012, the ORNL laboratory equipment was expanded and made available to the entire ATF community as the Severe Accident Test Station (SATS) [4,12]. Compared to the current UO2/Zr-based alloy fuel system, an ATF alternative would significantly reduce the rate of heat and hydrogen generation in the core during a coolant-limited severe accident [13-14]. The steam oxidation behavior of candidate materials is a key metric in the evaluation of ATF concepts and also an important input into models [15-17]. However, initial modeling work of FeCrAl cladding has used incomplete information on the physical properties of FeCrAl. Also, the steam oxidation data being collected at 1200°-1700°C is unique as no prior work has considered steam oxidation of alloys at such high temperatures. Also, because many accident scenarios include steadily increasing temperatures, the required data are not traditional isothermal exposures but exposures with varying “ramp” rates. In some cases, the steam oxidation behavior has been surprising and difficult to interpret. Thus, more fundamental information continues to be collected. In addition, more work continues to focus on commercially-manufactured tube material. This report summarizes recent work to characterize the behavior of candidate alloys exposed to high temperature steam, evaluate steam oxidation behavior in various ramp scenarios and continue to collect integral data on FeCrAl compared to conventional Zr-based cladding.

  14. Design of a test station for the CMS HCAL waveshifter/waveguide fiber system

    CERN Document Server

    Baumbaugh, B; Kozminski, J; Lu, Q; Ruchti, R C; Wayne, M; Budd, H S; De Barbaro, P; Skup, E

    1998-01-01

    A test station has been designed and is under construction to test the quality of assembled waveguide to waveshifter fiber to be used in the scintillating tile calorimeter for the Compact Moun Solenoid (CMS) Hadron Calorimeter $9 (HCAL). The test station consists of a light tight enclosure 6.8 meters long with the ability to move a light source over almost 6 meters of fiber. Data acquisition hardware and software are under development to analyze the quality $9 of the fiber as well as motor control hardware and software to operate the moveable light source. The design and performance expectations of the test station will be presented. (6 refs).

  15. Extending the GEMINI advanced review station development

    International Nuclear Information System (INIS)

    Kadner, S.; Spahn, W.; Pepper, S.

    1999-01-01

    Recent changes in the objectives of arms control agreements will have a dramatic impact on the nuclear non-proliferation regime. Meeting the demands of the nuclear non-proliferation regime will require the utilisation of the best available technological means for verification. The following discussion focuses on the increasing demands for safeguards with a view towards the possible technological solutions available to meet these demands. Based on the assumption that the gap between the international nonproliferation verification agenda and the available financial means can only be bridged via technology, the following discussion hopes to offer a compelling argument for the adoption of remote monitoring technologies in safeguards applications, specifically, data collection and review. The GEMINI Advanced Review Station (GARS) was developed with initial support from USPOTAS. This poster presentation presents the latest developments in GARS, including its extension to other surveillance systems under IAEA consideration, NDA applications, and networked safeguards. (author)

  16. Development of method for detecting signs deterioration in insulator of high-voltage motors. 2. Test Results of a new on-line partial discharge monitor for high-voltage motors in nuclear power stations

    International Nuclear Information System (INIS)

    Tochio, Atsushi; Kaneda, Yoshiharu; Urakawa, Nobuo

    2000-01-01

    For the purpose of early detection of deterioration of insulators in high-voltage motors which are widely utilized in nuclear power stations, a new on-line partial discharge (PD) monitor was developed and was tested for sixteen motors which were practically running in nuclear power stations. From the test results, it is seen that (1) good signal to noise ratio is obtained by adopting a two frequency correlation method, (2) a resistance temperature detector (RTD) in a motor has sufficient sensitivity to detect PD, (3) when RTD is not installed or is unable to use for this purpose, a radio frequency current transformer (RFCT) can be utilized, although its sensitivity is about 1/10 of that of the RTD monitor. Finally we found a good correlation between the results of this on-line method and the conventional off-line method in which the insulator resistance of a concerned motor was measured during its shut-down, and thereby we demonstrated that this method could be applicable to the on-line test of high-voltage motors in nuclear power stations. (author)

  17. Evaluation of data from HEPA filter quality assurance testing stations

    International Nuclear Information System (INIS)

    Collins, J.T.; Bellamy, R.R.; Allen, J.R.

    1979-01-01

    In Revision 1 to Regulatory Guide 1.52, issued in July 1976, the NRC recommended that high efficiency particulate air (HEPA) filters for use in engineered safety features (ESF) atmosphere cleanup systems be visually inspected and dioctylphtalate (DOP) tested at either of two Department of Energy (DOE) operated QA Filter Testing Stations prior to their installation and use in commercial nuclear power plants. This practice was initiated because filter vendors were unable to consistently provide a HEPA filter that would meet the stringent requirements established by DOE and NRC and its predecessor the AEC. In 1977, the NRC staff undertook a program to revise Regulatory Guide 1.52 to reflect recently issued industry standards (e.g., ANSI N509 and N510) and current industry practices. Revision 2 to Regulatory Guide 1.52 was formally issued in March 1978. In conducting this review, the recommendation that HEPA filters, intended for use in ESF systems in commercial nuclear power plants, be routinely tested at the DOE-QA Filter Testing Stations was revaluated. As part of this evluation a detailed analysis of the filter test results recorded by the two QA Testing Stations during the period 1971 to 1977 was conducted. This paper summarizes the results of the analysis and explains the rationale for deleting the requirement that all HEPA filters intended for use in ESF systems be tested at the AQ Testing Station

  18. Development and evaluation of test stations for the quality assurance of the silicon micro-strip detector modules for the CMS experiment

    International Nuclear Information System (INIS)

    Poettgens, M.

    2007-01-01

    CMS (Compact Muon Solenoid) is one of four large-scale detectors which will be operated at the LHC (Large Hadron Collider) at the European Laboratory for Particle Physics (CERN). For the search for new physics the reconstruction of the collision products and their properties is essential. In the innermost part of the CMS detector the traces of ionizing particles are measured utilizing a silicon tracker. A large fraction of this detector is equipped with silicon micro-strip modules which provide a precise space resolution in 1-dimension. A module consists of a sensor for detection of particles, the corresponding read-out electronics (hybrid) and a mechanical support structure. Since the 15,148 modules, which will be installed in the silicon micro-strip detector, have a total sensitive surface area of about 198 m 2 , the inner tracker of CMS is the largest silicon tracking detector, which has ever been built. While the sensors and hybrids are produced in industry, the construction of the modules and the control of the quality is done by the members of the 21 participating institutes. Since the access to the silicon micro-strip tracker will be very limited after the installation in the CMS detector the installed modules must be of high quality. For this reason the modules are thoroughly tested and the test results are uploaded to a central database. By the development of a read-out system and the corresponding software the III. Physikalisches Institut made an important contribution for the electrical and functional quality control of hybrids and modules. The read-out system provides all features for the operation and test of hybrids and modules and stands out due to high reliability and simple handling. Because a very user-friedly and highly automated software it became the official test tool and was integrated in various test stands. The test stands, in which the read-out system is integrated in, are described and the tests which are implemented in the corresponding

  19. Test Station for Measuring Aluminum Tube Geometrical Parameters

    CERN Document Server

    Oansea, D; Gongadze, A L; Gostkin, M I; Dedovich, D V; Evtoukhovitch, P G; Comanescu, B; Kotov, S A; Necsoiu, T; Potrap, I N; Rogalev, E V; Tskhadadze, E G; Chelkov, G A

    2001-01-01

    A test station for quality control of aluminum tube outer diameter and wall thickness is presented. The tested tubes are used for drift detector assembly of ATLAS (LHC, CERN) muon system. The outer diameter and wall thickness of aluminium tubes are measured by means of noncontact optical and ultrasonic methods respectively with the accuracy of 3 {\\mu}m. The testing process is automatic and interacts with the production data base.

  20. Software development assurance for special control computer sets on the base of the Electronica-60M microcomputer in the stations of fuel element nondestructive testing

    International Nuclear Information System (INIS)

    Vasil'kova, A.D.; Grachev, S.N.; Salakatova, L.S.

    1987-01-01

    A special computational control complex (SCCC) including the ''Elektronika-60M'' microcomputer, a device for communication with an object (DCO) based on the typical microprocessing set (TMS) based on LIUS-2 KTS means and an adapter for communication of the ''Elektronika-60M'' microcomputer bus with IK1 TMS bus developed for their conjugation is used for development of nondestructive control post software. An instrumental SCCC including SM-4 microcomputer, TMS units as DCO, an adapter for communication of the common bus of the SM-4 minicomputer with the IK1 TMS bus developed for their conjugation and devices for simulation of the facility operation is suggested to increase labour productivity of programmers. The SM-4 microcomputer permits to develop programs in the FORTRAN language and to carry out their effective adjustment. A subprogram library for communication with TMS units is compiled, and the technique for testing FORTRAN programs in programmable read-only memory TMS as well as start of these programs are developed

  1. Development and evaluation of test stations for the quality assurance of the silicon micro-strip detector modules for the CMS experiment

    Energy Technology Data Exchange (ETDEWEB)

    Poettgens, M.

    2007-11-22

    CMS (Compact Muon Solenoid) is one of four large-scale detectors which will be operated at the LHC (Large Hadron Collider) at the European Laboratory for Particle Physics (CERN). For the search for new physics the reconstruction of the collision products and their properties is essential. In the innermost part of the CMS detector the traces of ionizing particles are measured utilizing a silicon tracker. A large fraction of this detector is equipped with silicon micro-strip modules which provide a precise space resolution in 1-dimension. A module consists of a sensor for detection of particles, the corresponding read-out electronics (hybrid) and a mechanical support structure. Since the 15,148 modules, which will be installed in the silicon micro-strip detector, have a total sensitive surface area of about 198 m{sup 2}, the inner tracker of CMS is the largest silicon tracking detector, which has ever been built. While the sensors and hybrids are produced in industry, the construction of the modules and the control of the quality is done by the members of the 21 participating institutes. Since the access to the silicon micro-strip tracker will be very limited after the installation in the CMS detector the installed modules must be of high quality. For this reason the modules are thoroughly tested and the test results are uploaded to a central database. By the development of a read-out system and the corresponding software the III. Physikalisches Institut made an important contribution for the electrical and functional quality control of hybrids and modules. The read-out system provides all features for the operation and test of hybrids and modules and stands out due to high reliability and simple handling. Because a very user-friedly and highly automated software it became the official test tool and was integrated in various test stands. The test stands, in which the read-out system is integrated in, are described and the tests which are implemented in the

  2. Resident Station Contact Information for Application Developers

    Data.gov (United States)

    Social Security Administration — SSA provides a web service and downloadable file for SSA Resident Station locations, telephone numbers, and hours of operation. (Note: If you think an office might...

  3. Spallation neutron source target station design, development, and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Haines, J.R., E-mail: hainesjr@ornl.gov; McManamy, T.J.; Gabriel, T.A.; Battle, R.E.; Chipley, K.K.; Crabtree, J.A.; Jacobs, L.L.; Lousteau, D.C.; Rennich, M.J.; Riemer, B.W.

    2014-11-11

    The spallation neutron source target station is designed to safely, reliably, and efficiently convert a 1 GeV beam of protons to a high flux of about 1 meV neutrons that are available at 24 neutron scattering instrument beam lines. Research and development findings, design requirements, design description, initial checkout testing, and results from early operation with beam are discussed for each of the primary target subsystems, including the mercury target, neutron moderators and reflector, surrounding vessels and shielding, utilities, remote handling equipment, and instrumentation and controls. Future plans for the mercury target development program are also briefly discussed.

  4. Environmental qualification test of electrical penetration for nuclear power stations

    International Nuclear Information System (INIS)

    Kooziro, Tetsuya; Nakagawa, Akitoshi; Toyoda, Shigeru; Uno, Shunpei

    1979-01-01

    Environmental qualification test was conducted according to IEEE Std. 323-1974 in order to evaluate the safety and reliability of electrical penetration of PWR type nuclear power station. Electrical penetration is the assemblies of electric cables attached to the containment vessel and penetrate through the vessel. Since it is a part of the vessel, it is deemed to be one of the primary safety equipments that are important for the safety and reliability of nuclear power stations. Environmental tests were conducted continuously as to heat cycle, vibration and LOCA with the full size specimens of bushing type, pigtail type and triaxial cable type and at the same time thermal life and irradiation tests were conducted on the insulation materials used, in order to obtain the comprehensive evaluation of their electrical and mechanical characteristics. As the result, they all satisfied the requirements for the circuits for actual use during and after various environmental qualification tests according to IEEE Std. 323. (author)

  5. Mobile and modular. BGR develops seismological monitoring stations for universal applications; Mobil und modular. BGR entwickelt universell einsetzbare seismologische Messstationen

    Energy Technology Data Exchange (ETDEWEB)

    Hinz, Erwin; Hanneken, Mark [Bundesanstalt fuer Geowissenschaften und Rohstoffe, Hannover (Germany). Fachbereich ' ' Seismologisches Zentralobservatorium, Kernwaffenteststopp' '

    2016-05-15

    BGR seismologists often set up monitoring stations for testing purposes. The engineers from the Central Seismological Observatory have now developed a new type of mobile monitoring station which can be remotely controlled.

  6. Development of the Arctic radionuclide monitoring station

    International Nuclear Information System (INIS)

    King, S.E.; Phillips, G.W.; Aakenes, U.R.

    1996-01-01

    In recent years, the world has learned about the dumping of nuclear reactors and other waste into the Arctic seas by the former Soviet Union. Most of the information on the present levels of radioactivity in the region has been obtained by oceanographic expeditions conducted during the brief Arctic summers. Year-round monitoring of the movement of radio-activity during dynamic seasonal and episodic chances is hampered by the difficulties caused by sea ice, logistics and communication constraints associated with deployment and maintenance of monitoring equipment in this remote region. We have designed an autonomous station to measure the benthic gamma-ray emitting radioactivity for periods of at least one year. The station is capable of detecting a 30 Bq/m 3 increase in the 137 Cs activity in a 24 hour period. After a year-long deployment, the station releases its anchor and rises to the surface to transmit the accumulated spectra and oceanographic data via an Argos satellite link. The design and performance characteristics of the prototype station will be discussed

  7. Development of the Arctic radionuclide monitoring station

    Science.gov (United States)

    King, S. E.; Aakenes, U. R.; McCoy, K.; Phillips, G. W.

    1997-06-01

    The world has learned about the dumping of nuclear reactors and other waste into the Arctic seas by the former Soviet Union. Most of the information on the present levels of radioactivity in the region has been obtained by oceanographic expeditions conducted during the brief Arctic summers. Year-round monitoring of the movement of radioactivity during dynamic seasonal and episodic changes is hampered by the difficulties caused by sea ice, logistics and communication constraints associated with deployment and maintenance of monitoring equipment in this remote region. The authors have designed an autonomous station to measure the benthic gamma-ray emitting radioactivity for periods of at least one year. The station is capable of detecting a 30 Bq/m/sup 3/ increase in the /sup 137/Cs activity in a 24 hour period. After a year-long deployment, the station releases its anchor and rises to the surface to transmit the accumulated spectra and oceanographic data via an Argos satellite link. The design and performance characteristics of the prototype station are discussed.

  8. Modal Testing of Seven Shuttle Cargo Elements for Space Station

    Science.gov (United States)

    Kappus, Kathy O.; Driskill, Timothy C.; Parks, Russel A.; Patterson, Alan (Technical Monitor)

    2001-01-01

    From December 1996 to May 2001, the Modal and Control Dynamics Team at NASA's Marshall Space Flight Center (MSFC) conducted modal tests on seven large elements of the International Space Station. Each of these elements has been or will be launched as a Space Shuttle payload for transport to the International Space Station (ISS). Like other Shuttle payloads, modal testing of these elements was required for verification of the finite element models used in coupled loads analyses for launch and landing. The seven modal tests included three modules - Node, Laboratory, and Airlock, and four truss segments - P6, P3/P4, S1/P1, and P5. Each element was installed and tested in the Shuttle Payload Modal Test Bed at MSFC. This unique facility can accommodate any Shuttle cargo element for modal test qualification. Flexure assemblies were utilized at each Shuttle-to-payload interface to simulate a constrained boundary in the load carrying degrees of freedom. For each element, multiple-input, multiple-output burst random modal testing was the primary approach with controlled input sine sweeps for linearity assessments. The accelerometer channel counts ranged from 252 channels to 1251 channels. An overview of these tests, as well as some lessons learned, will be provided in this paper.

  9. Development of heavy load carrying vehicle for nuclear power station

    International Nuclear Information System (INIS)

    Terabayashi, Yasuharu; Oono, Hiroo; Aizu, Takao; Kawaguchi, Kaname; Yamanaka, Masayuki; Hirobe, Tamio; Inagaki, Yoshiaki.

    1985-01-01

    In nuclear power stations, in order to carry out sound and stable operation, the routine inspection and regular inspection of machinery and equipment are performed, therefore, the transportation of heavy things is frequently carried out. Especially, the transportation of heavy things over the steps of passages and stairs requires much labor. Therefore, Chubu Electric Power Co., Inc. and Chubu Plant Service Co., Ltd. carried out the research on the development of a vehicle for transporting heavy components of nuclear power plants. In this research, it was aimed at developing a vehicle which can carry heavy components and get over a step, climb and descend stairs, and run through a narrow passage having many curves as well as running on flat ground. For this purpose, the actual state of the transportation of heavy things was investigated during the regular inspection of a nuclear power station, and on the basis of this results, a prototype vehicle was made and tested. Thereafter, a transporting vehicle of actual scale was made and tested. The investigation of actual state and the examination of the fundamental concept, the design, trial manufacture and verifying test are reported. (Kako, I.)

  10. Space station common module network topology and hardware development

    Science.gov (United States)

    Anderson, P.; Braunagel, L.; Chwirka, S.; Fishman, M.; Freeman, K.; Eason, D.; Landis, D.; Lech, L.; Martin, J.; Mccorkle, J.

    1990-01-01

    Conceptual space station common module power management and distribution (SSM/PMAD) network layouts and detailed network evaluations were developed. Individual pieces of hardware to be developed for the SSM/PMAD test bed were identified. A technology assessment was developed to identify pieces of equipment requiring development effort. Equipment lists were developed from the previously selected network schematics. Additionally, functional requirements for the network equipment as well as other requirements which affected the suitability of specific items for use on the Space Station Program were identified. Assembly requirements were derived based on the SSM/PMAD developed requirements and on the selected SSM/PMAD network concepts. Basic requirements and simplified design block diagrams are included. DC remote power controllers were successfully integrated into the DC Marshall Space Flight Center breadboard. Two DC remote power controller (RPC) boards experienced mechanical failure of UES 706 stud-mounted diodes during mechanical installation of the boards into the system. These broken diodes caused input to output shorting of the RPC's. The UES 706 diodes were replaced on these RPC's which eliminated the problem. The DC RPC's as existing in the present breadboard configuration do not provide ground fault protection because the RPC was designed to only switch the hot side current. If ground fault protection were to be implemented, it would be necessary to design the system so the RPC switched both the hot and the return sides of power.

  11. Development of non-halogen cables for nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Yagyu, Hideki; Yamamoto, Yasuaki; Onishi, Takao (Hitachi Cable, Ltd., Tokyo (Japan))

    1983-12-01

    The non-halogen fire-resistant cables for nuclear power stations which never generate halogen gas, have been developed. The cables comprise the insulator of EP rubber and the sheath of polyolefine containing non-halogen inorganic fire-retardant. The results of the environmental test and fire-resistance test are described. In the environmental test, the cables were subjected to the heating, gamma-irradiation and steam exposure successively, according to IEEE specification 323,383, and subsequently the change in the appearance, tensile strength and electrical performance of the cables was measured. In the fire-resistance test, the vertical tray fire test according to the IEEE specification 383 was adopted, and other tests including the vertical fire test on insulator cores, oxygen index, the generation of corrosive gas, copper mirror corrosion test, gas toxicity test and optical smoke density test were carried out. It became clear that the cables did not generate halogen gas on burning, and brought about reduced toxicity, corrosion and smoke, and that the safety against fire is greatly improved by using the cables.

  12. Development of non-halogen cables for nuclear power stations

    International Nuclear Information System (INIS)

    Yagyu, Hideki; Yamamoto, Yasuaki; Onishi, Takao

    1983-01-01

    The non-halogen fire-resistant cables for nuclear power stations which never generate halogen gas, have been developed. The cables comprise the insulator of EP rubber and the sheath of polyolefine containing non-halogen inorganic fire-retardant. The results of the environmental test and fire-resistance test are described. In the environmental test, the cables were subjected to the heating, gamma-irradiation and steam exposure successively, according to IEEE specification 323,383, and subsequently the change in the appearance, tensile strength and electrical performance of the cables was measured. In the fire-resistance test, the vertical tray fire test according to the IEEE specification 383 was adopted, and other tests including the vertical fire test on insulator cores, oxygen index, the generation of corrosive gas, copper mirror corrosion test, gas toxicity test and optical smoke density test were carried out. It became clear that the cables did not generate halogen gas on burning, and brought about reduced toxicity, corrosion and smoke, and that the safety against fire is greatly improved by using the cables. (Yoshitake, I.)

  13. Technological development of Guangdong nuclear power station

    International Nuclear Information System (INIS)

    Huang Shiqiang

    2000-01-01

    After over 5 years of operations, the Guangdong Nuclear Power Station (GNPS) has achieved good results both economically and in operational safety performance. The main attributes to the success of the plant operational performances include the equipment reliability, the technical capability and management efficiency. To that the key strategy has been to adopt know-how and technological transfer and encourage self-innovation, aiming to strive for the long-term self-reliance in design, manufacturing and operating the plant. (author)

  14. Development of a test station for the illustration of a hydraulic heating network; Entwicklung eines Pruefstandes zur Abbildung eines hydraulischen Heizungsnetzwerks

    Energy Technology Data Exchange (ETDEWEB)

    Kopmann, Nina; Adolph, Michael; Mueller, Dirk [RWTH Aachen Univ. E.ON Energy Research Center (Germany). Inst. for Energy Efficient Buildings and Indoor Climate

    2011-07-01

    As the parameters describing air currents in rooms will change to the opposite when the characteristic length is shortened, small-scale investigations of room air currents are not possible. For this reason, the E.ON Energy Research Center set up a ''Hardware-in-the-Loop'' (HiL) test stand which models a real hydraulic heating system of an apartment or a building. The test stand consists of several interconnected model rooms with typical heating units, and only the enclosing building volume is reduced. The model rooms all have a volume of 3-4 m{sup 3}. Depending on the heat emitted by the radiators, the boundary conditions of air supply (volume flow and temperature) and of the walls (wall surface tempeartures) are calculated using the simulation software Modelica and are emulated in the test stand. The measured heat emissions of the radiators are used as boundary conditions in the thermohydraulic simulations. The function of the HiL test stand was first tested in a single model room. Verification of the test stand concept took place via measurements of the velocity and temperature field in front of the radiator, which were compared with measurements in a thermal test stand with realistic room dimensions. [German] Da die Parameter zur Beschreibung von Raumluftstroemungen bei einer Verkleinerung der charakteristischen Laenge ein gegensaetzliches Verhalten aufweisen, koennen die Untersuchungen von Raumluftstroemungen nicht kleinskaliert werden. Deswegen wird am E.ON Energy Research Center ein ''Hardware-in-the-Loop'' (HiL) -Pruefstand entwickelt, welcher ein reales hydraulisches Heizungsnetz einer Wohnung oder eines Gebaeudes mit geringem Platzbedarf nachbildet. In den Pruefstand, welcher aus mehreren vernetzten Modellraeumen besteht, werden typische Heizkoerper eingebaut und nur das umschliessende Volumen wird verkleinert. Die Modellraeume haben jeweils ein Volumen von 3-4 m{sup 3}. Abhaengig von der Waermeabgabe der Heizkoerper

  15. Space Station CMIF extended duration metabolic control test

    Science.gov (United States)

    Schunk, Richard G.; Bagdigian, Robert M.; Carrasquillo, Robyn L.; Ogle, Kathryn Y.; Wieland, Paul O.

    1989-01-01

    The Space Station Extended Duration Metabolic Control Test (EMCT) was conducted at the MSFC Core Module Integration Facility. The primary objective of the EMCT was to gather performance data from a partially-closed regenerative Environmental Control and Life Support (ECLS) system functioning under steady-state conditions. Included is a description of the EMCT configuration, a summary of events, a discussion of anomalies that occurred during the test, and detailed results and analysis from individual measurements of water and gas samples taken during the test. A comparison of the physical, chemical, and microbiological methods used in the post test laboratory analyses of the water samples is included. The preprototype ECLS hardware used in the test, providing an overall process description and theory of operation for each hardware item. Analytical results pertaining to a system level mass balance and selected system power estimates are also included.

  16. Space Station Environmental Control and Life Support System Test Facility at Marshall Space Flight Center

    Science.gov (United States)

    Springer, Darlene

    1989-01-01

    Different aspects of Space Station Environmental Control and Life Support System (ECLSS) testing are currently taking place at Marshall Space Flight Center (MSFC). Unique to this testing is the variety of test areas and the fact that all are located in one building. The north high bay of building 4755, the Core Module Integration Facility (CMIF), contains the following test areas: the Subsystem Test Area, the Comparative Test Area, the Process Material Management System (PMMS), the Core Module Simulator (CMS), the End-use Equipment Facility (EEF), and the Pre-development Operational System Test (POST) Area. This paper addresses the facility that supports these test areas and briefly describes the testing in each area. Future plans for the building and Space Station module configurations will also be discussed.

  17. Microwave energy transmission test toward the SPS using the space station

    Energy Technology Data Exchange (ETDEWEB)

    Kaya, N.; Matsumoto, H.; Miyatake, S.; Kimura, I.; Nagatomo, M.

    1986-12-01

    An outline of a project METT (Microwave Energy Transmission Test) using the Space Station is described. The objectives of the METT are to develop and test the technology of microwave energy transmission for the future Solar Power Satellite (SPS), and to estimate the environmental effects of the high power microwaves on the ionosphere and the atmosphere. Energy generated with solar cells is transmitted from a transmitting antenna on the bus platform near the Space Station to a rectenna on the sub-satellite or the ground station in order to test the total efficiency and the functions of the developed system of the energy transmission. Plasma similar to that in the D and E layers in the ionosphere is produced in a large balloon opened on the sub-satellite in order to investigate possible interactions between the SPS microwave and the ionospheric plasma and to determine the maximum power density of the microwave beam which passes through the ionosphere.

  18. Space Station thermal storage/refrigeration system research and development

    Science.gov (United States)

    Dean, W. G.; Karu, Z. S.

    1993-01-01

    Space Station thermal loading conditions represent an order of magnitude increase over current and previous spacecraft such as Skylab, Apollo, Pegasus III, Lunar Rover Vehicle, and Lockheed TRIDENT missiles. Thermal storage units (TSU's) were successfully used on these as well as many applications for ground based solar energy storage applications. It is desirable to store thermal energy during peak loading conditions as an alternative to providing increased radiator surface area which adds to the weight of the system. Basically, TSU's store heat by melting a phase change material (PCM) such as a paraffin. The physical property data for the PCM's used in the design of these TSU's is well defined in the literature. Design techniques are generally well established for the TSU's. However, the Space Station provides a new challenge in the application of these data and techniques because of three factors: the large size of the TSU required, the integration of the TSU for the Space Station thermal management concept with its diverse opportunities for storage application, and the TSU's interface with a two-phase (liquid/vapor) thermal bus/central heat rejection system. The objective in the thermal storage research and development task was to design, fabricate, and test a demonstration unit. One test article was to be a passive thermal storage unit capable of storing frozen food at -20 F for a minimum of 90 days. A second unit was to be capable of storing frozen biological samples at -94 F, again for a minimum of 90 days. The articles developed were compatible with shuttle mission conditions, including safety and handling by astronauts. Further, storage rack concepts were presented so that these units can be integrated into Space Station logistics module storage racks. The extreme sensitivity of spacecraft radiator systems design-to-heat rejection temperature requirements is well known. A large radiator area penalty is incurred if low temperatures are accommodated via a

  19. Engineering test station for TFTR blanket module experiments

    International Nuclear Information System (INIS)

    Jassby, D.L.; Leinoff, S.

    1979-12-01

    A conceptual design has been carried out for an Engineering Test Station (ETS) which will provide structural support and utilities/instrumentation services for blanket modules positioned adjacent to the vacuum vessel of the TFTR (Tokamak Fusion Test Reactor). The ETS is supported independently from the Test Cell floor. The ETS module support platform is constructed of fiberglass to eliminate electromagnetic interaction with the pulsed tokamak fields. The ETS can hold blanket modules with dimensions up to 78 cm in width, 85 cm in height, and 105 cm in depth, and with a weight up to 4000 kg. Interfaces for all utility and instrumentation requirements are made via a shield plug in the TFTR igloo shielding. The modules are readily installed or removed by means of TFTR remote handling equipment

  20. On Dimensions of OTA Setups for Massive MIMO Base Stations Radiated Testing

    DEFF Research Database (Denmark)

    Kyösti, Pekka; Fan, Wei; Pedersen, Gert F.

    2016-01-01

    The development of base stations (BS) with large aperture antenna arrays, enabled partially by the utilization of cmWave and mmWave frequency bands, will require radiated testing in fading conditions. In this paper, the objective is to investigate the suitable measurement distances and physical...

  1. metrological performance improvement of a superconducting cable test station

    CERN Document Server

    Montenero, Giuseppe; Ballarino, Amalia

    The work presented in this PhD thesis concerns the metrological performance improvement of a superconducting cable test station based on superconducting transformers. The main cable’s parameter to be assessed –as a function of temperature and magnetic field– is the critical current, i.e. beyond this limit the phase transition to the normal state occurs. Ramping the current at levels in the order of the tens of kA can be achieved with superconducting transformers at moderate capital and operational cost. But, issues such as (i) accurate/precise measurements and (ii) monitoring of the secondary current during the device operation have to be addressed. In this regard, the goals of the thesis are the design, prototyping, and validation of a new cryogenic current transducer and effective monitoring system for test stations transformer-based. Among the available transducers for current sensing at room temperature, the DC current transformer (DCCT) provides measurement accuracy in the order of the hundreds of ...

  2. Space station environmental control and life support systems test bed program - an overview

    Science.gov (United States)

    Behrend, Albert F.

    As the National Aeronautics and Space Administration (NASA) begins to intensify activities for development of the Space Station, decisions must be made concerning the technical state of the art that will be baselined for the initial Space Station system. These decisions are important because significant potential exists for enhancing system performance and for reducing life-cycle costs. However, intelligent decisions cannot be made without an adequate assessment of new and ready technologies, i.e., technologies which are sufficiently mature to allow predevelopment demonstrations to prove their application feasibility and to quantify the risk associated with their development. Therefore, the NASA has implemented a technology development program which includes the establishment of generic test bed capabilities in which these new technologies and approaches can be tested at the prototype level. One major Space Station subsystem discipline in which this program has been implemented is the environmental control and life support system (ECLSS). Previous manned space programs such as Gemini, Apollo, and Space Shuttle have relied heavily on consumables to provide environmental control and life support services. However, with the advent of a long-duration Space Station, consumables must be reduced within technological limits to minimize Space Station resupply penalties and operational costs. The use of advanced environmental control and life support approaches involving regenerative processes offers the best solution for significant consumables reduction while also providing system evolutionary growth capability. Consequently, the demonstration of these "new technologies" as viable options for inclusion in the baseline that will be available to support a Space Station initial operational capability in the early 1990's becomes of paramount importance. The mechanism by which the maturity of these new regenerative life support technologies will be demonstrated is the Space

  3. Phase III Simplified Integrated Test (SIT) results - Space Station ECLSS testing

    Science.gov (United States)

    Roberts, Barry C.; Carrasquillo, Robyn L.; Dubiel, Melissa Y.; Ogle, Kathryn Y.; Perry, Jay L.; Whitley, Ken M.

    1990-01-01

    During 1989, phase III testing of Space Station Freedom Environmental Control and Life Support Systems (ECLSS) began at Marshall Space Flight Center (MSFC) with the Simplified Integrated Test. This test, conducted at the MSFC Core Module Integration Facility (CMIF), was the first time the four baseline air revitalization subsystems were integrated together. This paper details the results and lessons learned from the phase III SIT. Future plans for testing at the MSFC CMIF are also discussed.

  4. Review of DDH 280 citadel cleansing station development. Memorandum report

    Energy Technology Data Exchange (ETDEWEB)

    Dyck, W.R.; McAndless, J.M.; Ho, J.

    1994-02-01

    A mock-up of a DDH 280 class destroyer Aft Cleansing Station has been modified following several technical evaluations. Chemical and biological simulant trials have been carried out and in the conclusion of these trials it was stated that the integrity of the citadel was maintained within a chemical or biological environment. Procedures have been developed which allowed a single man, or a group of men, or a casualty to proceed through an Aft Cleansing Station with minimum effort, and in a coordinated fashion. Evaluations have now been completed where the cleansing station and the personnel passing through it were challenged with the biological simulant Bacillus globigii (BG), and the chemical intake simulant dimethyl sulfoxide (DMSO). It was concluded, that when the cleansing station was operated properly, and the new procedures were being followed, it was possible to process contaminated personnel through the citadel entry system, and maintain the integrity of the citadel.

  5. Investigation of a Station Blackout Scenario with the ATLAS Test

    International Nuclear Information System (INIS)

    Kim, Yeon Sik; Yu, Xin Guo; Kang, Kyoung Ho; Park, Hyun Sik; Cho, Seok; Min, Kyeong Ho; Choi, Nam Hyeon; Kim, Bok Deuk; Park, Jong Gook; Choi, Ki Yong

    2012-01-01

    KAERI (Korea Atomic Energy Research Institute) has been operating an integral effect test facility, ATLAS (Advanced Thermal-Hydraulic Test Loop for Accident Simulation), for accident simulations pertaining to the OPR1000 (Optimized Power Reactor, 1000MWe) and the APR1400 (Advanced Power Reactor, 1400MWe) which are in operation and under construction in Korea, respectively. After the Fukushima accidents due to the combination of an earthquake followed by a tsunami in east Japan on March 11, 2011, the concept of boundary between the design basis and beyond-design basis accidents became obscure. One scenario is the station blackout (SBO), which is defined as 'the loss of all alternating current (AC) power in a nuclear power plant' by the USNRC 10CFR50 Section 50.63, which has adopted a new safety regulation for the SBO in June of 1988. In any case the SBO that occurred in Fukushima seemed to go beyond the definition of the current SBO scenario. In the mean time, numerous researches has been conducted on the safety concern of the SBO for existing and advanced nuclear power plants worldwide. From the internal review of an SBO scenario, it was concluded that the understanding of the thermo-hydraulic phenomena occurred within the reactor coolant system is a prerequisite although seemed to be quite a simple sequence of events. This was the motivation of an SBO test using the ATLAS facility. For the understanding of the physical phenomena within the primary system, an SBO was assumed with simple intial and boundary conditions, e.g. start of an SBO at time zero, no diesel and AC powers, no auxiliary feedwater pumps (motor-driven and turbine driven) etc. In this paper, overview of the SBO test results was described including a result of analytical calculations simulating the SBO test using the MARS code

  6. Corrective action decision document, Second Gas Station, Tonopah test range, Nevada (Corrective Action Unit No. 403)

    International Nuclear Information System (INIS)

    1997-11-01

    This Corrective Action Decision Document (CADD) for Second Gas Station (Corrective Action Unit [CAU] No. 403) has been developed for the U.S. Department of Energy's (DOE) Nevada Environmental Restoration Project to meet the requirements of the Federal Facility Agreement and Consent Order (FFACO) of 1996 as stated in Appendix VI, open-quotes Corrective Action Strategyclose quotes (FFACO, 1996). The Second Gas Station Corrective Action Site (CAS) No. 03-02-004-0360 is the only CAS in CAU No. 403. The Second Gas Station CAS is located within Area 3 of the Tonopah Test Range (TTR), west of the Main Road at the location of former Underground Storage Tanks (USTs) and their associated fuel dispensary stations. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air and approximately 56 km (35 mi) southeast of Tonopah, Nevada, by road. The TTR is bordered on the south, east, and west by the Nellis Air Force Range and on the north by sparsely populated public land administered by the Bureau of Land Management and the U.S. Forest Service. The Second Gas Station CAS was formerly known as the Underground Diesel Tank Site, Sandia Environmental Restoration Site Number 118. The gas station was in use from approximately 1965 to 1980. The USTs were originally thought to be located 11 meters (m) (36 feet [ft]) east of the Old Light Duty Shop, Building 0360, and consisted of one gasoline UST (southern tank) and one diesel UST (northern tank) (DOE/NV, 1996a). The two associated fuel dispensary stations were located northeast (diesel) and southeast (gasoline) of Building 0360 (CAU 423). Presently the site is used as a parking lot, Building 0360 is used for mechanical repairs of vehicles

  7. An Unattended Verification Station for UF6 Cylinders: Development Status

    International Nuclear Information System (INIS)

    Smith, E.; McDonald, B.; Miller, K.; Garner, J.; March-Leuba, J.; Poland, R.

    2015-01-01

    In recent years, the International Atomic Energy Agency (IAEA) has pursued innovative techniques and an integrated suite of safeguards measures to address the verification challenges posed by advanced centrifuge technologies and the growth in separative work unit capacity at modern centrifuge enrichment plants. These measures would include permanently installed, unattended instruments capable of performing the routine and repetitive measurements previously performed by inspectors. Among the unattended instruments currently being explored by the IAEA is an Unattended Cylinder Verification Stations (UCVS) that could provide independent verification of the declared relative enrichment, U-235 mass and total uranium mass of all declared cylinders moving through the plant, as well as the application and verification of a ''Non-destructive Assay Fingerprint'' to preserve verification knowledge on the contents of each cylinder throughout its life in the facility. As IAEA's vision for a UCVS has evolved, Pacific Northwest National Laboratory (PNNL) and Los Alamos National Laboratory have been developing and testing candidate non-destructive assay (NDA) methods for inclusion in a UCVS. Modeling and multiple field campaigns have indicated that these methods are capable of assaying relative cylinder enrichment with a precision comparable to or substantially better than today's high-resolution handheld devices, without the need for manual wall-thickness corrections. In addition, the methods interrogate the full volume of the cylinder, thereby offering the IAEA a new capability to assay the absolute U-235 mass in the cylinder, and much-improved sensitivity to substituted or removed material. Building on this prior work, and under the auspices of the United States Support Programme to the IAEA, a UCVS field prototype is being developed and tested. This paper provides an overview of: a) hardware and software design of the prototypes, b) preparation

  8. Operation of the Hoenoe wind power test station. Final report; Drift av Hoenoe provstation. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Ellsen, Magnus; Carlson, Ola [Chalmers Univ. of Tech., Goeteborg (Sweden). Dept. of Electric Power Engineering

    2002-04-01

    This project has made it possible to have autonomous operation of the Chalmers experimental wind turbine. By development of the optimal speed and stall control the energy production is good. The test station has been put in good order and is well prepared to been shown to visitors. The proposed research will focus on series capacitors for increasing the power output and better control of the damping valves to reduce vibrations.

  9. Stuart Energy's experiences in developing 'Hydrogen Energy Station' infrastructure

    International Nuclear Information System (INIS)

    Crilly, B.

    2004-01-01

    'Full text:' With over 50 years experience, Stuart Energy is the global leader in the development, manufacture and integration of multi-use hydrogen infrastructure products that use the Company's proprietary IMET hydrogen generation water electrolysis technology. Stuart Energy offers its customers the power of hydrogen through its integrated Hydrogen Energy Station (HES) that provides clean, secure and distributed hydrogen. The HES can be comprised of five modules: hydrogen generation, compression, storage, fuel dispensing and / or power generation. This paper discusses Stuart Energy's involvement with over 10 stations installed in recent years throughout North America, Asia and Europe while examining the economic and environmental benefits of these systems. (author)

  10. Development of a Space Station Operations Management System

    Science.gov (United States)

    Brandli, A. E.; McCandless, W. T.

    To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

  11. Development of a Space Station Operations Management System

    Science.gov (United States)

    Brandli, A. E.; Mccandless, W. T.

    1988-01-01

    To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

  12. Development of Base Transceiver Station Selection Algorithm for ...

    African Journals Online (AJOL)

    TEMS) equipment was carried out on the existing BTSs, and a linear algorithm optimization program based on the spectral link efficiency of each BTS was developed, the output of this site optimization gives the selected number of base station sites ...

  13. The Space Station Photovoltaic Panels Plasma Interaction Test Program: Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1989-01-01

    The Plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  14. The Space Station photovoltaic panels plasma interaction test program - Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1990-01-01

    The plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  15. Definition of technology development missions for early space stations: Large space structures

    Science.gov (United States)

    Gates, R. M.; Reid, G.

    1984-01-01

    The objectives studied are the definition of the tested role of an early Space Station for the construction of large space structures. This is accomplished by defining the LSS technology development missions (TDMs) identified in phase 1. Design and operations trade studies are used to identify the best structural concepts and procedures for each TDMs. Details of the TDM designs are then developed along with their operational requirements. Space Station resources required for each mission, both human and physical, are identified. The costs and development schedules for the TDMs provide an indication of the programs needed to develop these missions.

  16. Role of the Space Station in Private Development of Space

    Science.gov (United States)

    Uhran, M. L.

    2002-01-01

    The International Space Station (ISS) is well underway in the assembly process and progressing toward completion. In February 2001, the United States laboratory "Destiny" was successfully deployed and the course of space utilization, for laboratory-based research and development (R&D) purposes, entered a new era - continuous on-orbit operations. By completion, the ISS complex will include pressurized laboratory elements from Europe, Japan, Russia and the U.S., as well as external platforms which can serve as observatories and technology development test beds serviced by a Canadian robotic manipulator. The international vision for a continuously operating, full service R&D complex in the unique environment of low-Earth orbit is becoming increasingly focused. This R&D complex will offer great opportunities for economic return as the basic research program proceeds on a global scale and the competitive advantages of the microgravity and ultravacuum environments are elucidated through empirical studies. In parallel, the ISS offers a new vantage point, both as a source for viewing of Earth and the Cosmos and as the subject of view for a global population that has grown during the dawning of the space age. In this regard, the ISS is both a working laboratory and a powerful symbol for human achievement in science and technology. Each of these aspects bears consideration as we seek to develop the beneficial attributes of space and pursue innovative approaches to expanding this space complex through private investment. Ultimately, the success of the ISS will be measured by the outcome at the end of its design lifetime. Will this incredible complex be de-orbited in a fiery finale, as have previous space platforms? Will another, perhaps still larger, space station be built through global government funding? Will the ISS ownership be transferred to a global, non-government organization for refurbishment and continuation of the mission on a privately financed basis? Steps taken

  17. LHCb: Test Station for the LHCb Muon Front-End Electronic

    CERN Multimedia

    Polycarpo, E

    2005-01-01

    The LHCb Muon Group has developed the CMOS ASIC CARIOCA to readout its Multiwire Proportional Chambers (MWPC) and GEM detectors, using a rad-hard IBM 0.25um process. Each ASIC holds 8 identical current-mode ASDB channels with individual input thresholds. The Muon detector contains around 120000 physical channels, requiring production of 20000 front-end chips, roughly. CARIOCA has been developed to process MWPC cathode and anode signals and two different versions have been implemented to overcome the requirement of MWP and GEM chambers operation. The test station has been devised to accomplish bipolar tests and to measure characteristics of both CARIOCA versions.

  18. Optimal test intervals for shutdown systems for the Cernavoda nuclear power station

    International Nuclear Information System (INIS)

    Negut, Gh.; Laslau, F.

    1993-01-01

    Cernavoda nuclear power station required a complete PSA study. As a part of this study, an important goal to enhance the effectiveness of the plant operation is to establish optimal test intervals for the important engineering safety systems. The paper presents, briefly, the current methods to optimize the test intervals. For this reason it was used Vesely methods to establish optimal test intervals and Frantic code to survey the influence of the test intervals on system availability. The applications were done on the Shutdown System no. 1, a shutdown system provided whit solid rods and on Shutdown System no. 2 provided with injecting poison. The shutdown systems receive nine total independent scram signals that dictate the test interval. Fault trees for the both safety systems were developed. For the fault tree solutions an original code developed in our Institute was used. The results, intended to be implemented in the technical specifications for test and operation of Cernavoda NPS are presented

  19. Test of thermal shields for early warning station detectors

    DEFF Research Database (Denmark)

    Petersen, Jesper

    1997-01-01

    The properties of thermal shields around NaI crystal scintillators for early warning stations have been checked in order to assure that external temperature variations cannot influence the stability of the measurements....

  20. Field testing of behavioral barriers for cooling water intake structures -test site 1 - Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Patrick, P.H.; McKinley, R.S.; Micheletti, W.C.

    1988-01-01

    A multi-year research program was developed by the Electric Power Research Institute to evaluate the effectiveness of selected behavioral systems for fish exclusion at sites representative of different aquatic environments. The first test site was the Pickering Nuclear Generating Station (NGS) located on Lake Ontario which represented the Great Lakes environment. A single pneumatic popper, a low frequency, high amplitude sound deterrent, was found to effectively exclude adult alewife, the principal species impinged at Pickering NGS. An air bubble curtain, used either alone or combined with strobe lights, was not a consistent deterrent. Effectiveness of air bubbles was only enhanced when used in association with a popper. Strobe lights were the least effective of the three devices tested. Operation of all three devices together did not surpass the effectiveness of the popper when used alone. Sound deterrents show promise for fish exclusion at generating stations located on the Great Lakes

  1. Preliminary Test Results of Heshe Hydrogeological Experimental Well Station in Taiwan

    Science.gov (United States)

    Chuang, P.; Liu, C.; Lin, M.; Chan, W.; Lee, T.; Chia, Y.; Teng, M.; Liu, C.

    2013-12-01

    Safe disposal of radioactive waste is a critical issue for the development of nuclear energy. The design of final disposal system is based on the concept of multiple barriers which integrate the natural barriers and engineering barriers for long-term isolation of radioactive wastes. As groundwater is the major medium that can transport radionuclides to our living environment, it is essential to characterize groundwater flow at the disposal site. Taiwan is located at the boundary between the Eurasian plate and the Philippine Sea plate. Geologic formations are often fractured due to tectonic compression and extension. In this study, a well station for the research and development of hydrogeological techniques was established at the Experimental Forest of the National Taiwan University in central Taiwan. There are 10 testing wells, ranging in depth from 25 m to 100 m, at the station. The bedrock beneath the regolith is highly fractured mudstone. As fracture is the preferential pathway of the groundwater flow, the focus of in-situ tests is to investigate the location of permeable fractures and the connection of permeable fractures. Several field tests have been conducted, including geophysical logging, heat-pulse flowmeter, hydraulic test, tracer test and double packer test, for the development of advanced technologies to detect the preferential groundwater flow in fractured rocks.

  2. Shippingport Atomic Power Station Operating Experience, Developments and Future Plans

    International Nuclear Information System (INIS)

    Feinroth, H.; Oldham, G.M.; Stiefel, J.T.

    1963-01-01

    This paper describes and evaluates five years of operation and test of the Shippingport Atomic Power Station and discusses the current technical developments and future plans of the Shippingport programme. This programme is directed towards development of the basic technology of light-water reactors to provide the basis for potential reduction in the costs of nuclear power. The Shippingport reactor plant has operated for over five years and has been found to integrate readily into a utility system either as a base load or peak load unit. Plant component performance has been reliable. There have been no problems in contamination or waste disposal. Access to primary coolant components for maintenance has been good, demonstrating the integrity of fuel elements. Each of the three refuelling operations performed since start-up of Shippingport has required successively less time to accomplish. Recently, the third seed was refuelled in 32 working days, about one quarter the time required for the first refuelling. The formal requirements of personnel training, written administrative procedures, power plant manuals, etc., which have been a vital factor in the successful implementation of the Shippingport programme, are described. The results obtained from the comprehensive test programme carried out at Shippingport are compared with calculations, and good agreement has been obtained. Reactor core performance, plant stability, and response to load changes, fuel element and control rod performance, long-term effects such as corrosion and radiation level build-up, component performance, etc., are discussed in this paper. The principal objective of the current and future programmes of the Shippingport Project in advancing the basic technology of water-cooled reactors is discussed. This programme includes the continued operation of the Shippingport plant, and the development, design, manufacture and test operation of a long-life, highpower density second core - Core 2. At its

  3. Finite element analysis of an underground protective test station subjected to severe ground motion

    International Nuclear Information System (INIS)

    Burchett, S.N.; Milloy, J.A.; Von Riesemann, W.A.

    1974-01-01

    A recoverable test station, to be used at a location very close to the detonation point of an underground nuclear test, was designed and tested. The design required that the station survive the very severe free-field stress and that the acceleration of the station be limited to a tolerable level. The predicted magnitude and time history of the free-field stress and acceleration indicated that the volcanic tuff medium and the materials of the proposed structure would exhibit nonlinear behavior, so that a transient dynamic analysis of a composite type structure involving nonlinear materials and large deformations was necessary. Parameter studies using a linear elastic dynamic finite element technique were first done to gain an understanding of the effect of the material properties and to study the response of various configurations of the protective structure to the transient loading. Based upon the results of these parameter studies and upon fielding considerations, a tentative design was chosen. This design was then evaluated using a newly developed finite element computer program. The results obtained from this analysis are compared to the field test results. (U.S.)

  4. Lunar Station: The Next Logical Step in Space Development

    Science.gov (United States)

    Pittman, Robert Bruce; Harper, Lynn; Newfield, Mark; Rasky, Daniel J.

    2014-01-01

    The International Space Station (ISS) is the product of the efforts of sixteen nations over the course of several decades. It is now complete, operational, and has been continuously occupied since November of 20001. Since then the ISS has been carrying out a wide variety of research and technology development experiments, and starting to produce some pleasantly startling results. The ISS has a mass of 420 metric tons, supports a crew of six with a yearly resupply requirement of around 30 metric tons, within a pressurized volume of 916 cubic meters, and a habitable volume of 388 cubic meters. Its solar arrays produce up to 84 kilowatts of power. In the course of developing the ISS, many lessons were learned and much valuable expertise was gained. Where do we go from here? The ISS offers an existence proof of the feasibility of sustained human occupation and operations in space over decades. It also demonstrates the ability of many countries to work collaboratively on a very complex and expensive project in space over an extended period of time to achieve a common goal. By harvesting best practices and lessons learned, the ISS can also serve as a useful model for exploring architectures for beyond low-­- earth-­-orbit (LEO) space development. This paper will explore the concept and feasibility for a Lunar Station. The Station concept can be implemented by either putting the equivalent capability of the ISS down on the surface of the Moon, or by developing the required capabilities through a combination of delivered materials and equipment and in situ resource utilization (ISRU). Scenarios that leverage existing technologies and capabilities as well as capabilities that are under development and are expected to be available within the next 3-­5 years, will be examined. This paper will explore how best practices and expertise gained from developing and operating the ISS and other relevant programs can be applied to effectively developing Lunar Station.

  5. Definition of technology development missions for early Space Station satellite servicing. Volume 1: Executive summary

    Science.gov (United States)

    1984-01-01

    The Executive Summary volume 1, includes an overview of both phases of the Definition of Technology Development Missions for Early Space Station Satellite Servicing. The primary purpose of Phase 1 of the Marshall Space Flight Center (MSFC) Satellite Servicing Phase 1 study was to establish requirements for demonstrating the capability of performing satellite servicing activities on a permanently manned Space Station in the early 1990s. The scope of Phase 1 included TDM definition, outlining of servicing objectives, derivation of initial Space Station servicing support requirements, and generation of the associated programmatic schedules and cost. The purpose of phase 2 of the satellite servicing study was to expand and refine the overall understanding of how best to use the manned space station as a test bed for demonstration of satellite servicing capabilities.

  6. Multi-Use seismic stations offer strong deterrent to clandestine nuclear weapons testing

    Science.gov (United States)

    Hennet, C. B.; Van der Vink, G. E.; Richards, P. G.; Adushkin, V. V.; Kopnichev, Y. F.; Geary, R.

    As the United States and other nations push for the signing of a Comprehensive Test Ban Treaty, representatives are meeting in Geneva this year to develop an International Seismic Monitoring System to verify compliance with the treaty's restrictions. In addition to the official monitoring system, regional networks developed for earthquake studies and basic research can provide a strong deterrent against clandestine testing. The recent release of information by the U.S. Department of Energy (DoE) on previously unannounced nuclear tests provides an opportunity to assess the ability of multi-use seismic networks to help monitor nuclear testing across the globe.Here we look at the extent to which the formerly unannounced tests were recorded and identified on the basis of publicly available seismographic data recorded by five seismic networks. The data were recorded by networks in southern Nevada and northern California at stations less than 1500 km from the Nevada Test Site (NTS), and two networks in the former Soviet Union at stations farther than 1500 km from the NTS.

  7. Modular space station, phase B extension. Information management advanced development. Volume 2: Communications terminal breadboard

    Science.gov (United States)

    Gerber, C. R.

    1972-01-01

    The design and development of the communications terminal breadboard for the modular space station are discussed. The subjects presented are: (1) history of communications terminal breadboard, (2) requirements analysis, (3) technology goals in terminal design, and (4) communications terminal board integration tests.

  8. Background noise model development for seismic stations of KMA

    Science.gov (United States)

    Jeon, Youngsoo

    2010-05-01

    The background noise recorded at seismometer is exist at any seismic signal due to the natural phenomena of the medium which the signal passed through. Reducing the seismic noise is very important to improve the data quality in seismic studies. But, the most important aspect of reducing seismic noise is to find the appropriate place before installing the seismometer. For this reason, NIMR(National Institution of Meteorological Researches) starts to develop a model of standard background noise for the broadband seismic stations of the KMA(Korea Meteorological Administration) using a continuous data set obtained from 13 broadband stations during the period of 2007 and 2008. We also developed the model using short period seismic data from 10 stations at the year of 2009. The method of Mcmara and Buland(2004) is applied to analyse background noise of Korean Peninsula. The fact that borehole seismometer records show low noise level at frequency range greater than 1 Hz compared with that of records at the surface indicate that the cultural noise of inland Korean Peninsula should be considered to process the seismic data set. Reducing Double Frequency peak also should be regarded because the Korean Peninsula surrounded by the seas from eastern, western and southern part. The development of KMA background model shows that the Peterson model(1993) is not applicable to fit the background noise signal generated from Korean Peninsula.

  9. Fuel Retrieval Sub-Project (FRS) Stuck Fuel Station Performance Test Data Report

    International Nuclear Information System (INIS)

    THIELGES, J.R.

    2000-01-01

    This document provides the test data report for Stuck Fuel Station Performance Testing in support of the Fuel Retrieval Sub-Project. The stuck fuel station was designed to provide a means of cutting open a canister barrel to release fuel elements, etc

  10. The Space Station Module Power Management and Distribution automation test bed

    Science.gov (United States)

    Lollar, Louis F.

    1991-01-01

    The Space Station Module Power Management And Distribution (SSM/PMAD) automation test bed project was begun at NASA/Marshall Space Flight Center (MSFC) in the mid-1980s to develop an autonomous, user-supportive power management and distribution test bed simulating the Space Station Freedom Hab/Lab modules. As the test bed has matured, many new technologies and projects have been added. The author focuses on three primary areas. The first area is the overall accomplishments of the test bed itself. These include a much-improved user interface, a more efficient expert system scheduler, improved communication among the three expert systems, and initial work on adding intermediate levels of autonomy. The second area is the addition of a more realistic power source to the SSM/PMAD test bed; this project is called the Large Autonomous Spacecraft Electrical Power System (LASEPS). The third area is the completion of a virtual link between the SSM/PMAD test bed at MSFC and the Autonomous Power Expert at Lewis Research Center.

  11. Principal facts for about 16,000 gravity stations in the Nevada Test Site and vicinity

    International Nuclear Information System (INIS)

    Harris, R.N.; Ponce, D.A.; Oliver, H.W.; Healey, D.L.

    1989-01-01

    The Nevada Test Site (NTS) and vicinity includes portions of the Goldfield, Caliente, Death Valley, and Las Vegas. This report documents and consolidates previously published and recently compiled gravity data to establish a gravity data base of about 16,000 stations for the NTS and vicinity. While compiling data sets, redundant stations and stations having doubtful locations or gravity values were excluded. Details of compiling the gravity data sets are discussed in later sections. Where feasible, an accuracy code has been assigned to each station so that the accuracy or reliability of each station can be evaluated. This data base was used in preparing complete Bouguer and isostatic gravity maps of the NTS and vicinity. Since publication of the complete Bouguer gravity map, additional data were incorporated into the isostatic gravity map. Gravity data were compiled from five sources: 14,183 stations from the US Geological Survey (USGS), 326 stations from Exploration Data Consultants (EDCON) of Denver, Colorado, 906 stations from the Los Alamos National Laboratory (LANL), 212 stations from the University of Texas at Dallas (UTD), and 48 stations from the Defense Mapping Agency (DMA). This investigation is an effort to study several areas for potential storage of high-level radioactive waste. Gravity stations established under YMP are shown. The objective of this gravity survey was to explore for the presence of plutons. 33 refs., 24 figs., 9 tabs

  12. Principal facts for about 16,000 gravity stations in the Nevada Test Site and vicinity

    International Nuclear Information System (INIS)

    Harris, R.N.; Ponce, D.A.; Oliver, H.W.; Healey, D.L.

    1989-01-01

    The Nevada Test Site (NTS) and vicinity includes portions of the Goldfield, Caliente, Death Valley, and Las Vegas. This report documents and consolidates previously published and recently compiled gravity data to establish a gravity data base of about 16,000 stations for the NTS and vicinity. While compiling data sets, redundant stations and stations having doubtful locations or gravity values were excluded. Details of compiling the gravity data sets are discussed in later sections. Where feasible, an accuracy code has been assigned to each station so that the accuracy or reliability of each station can be evaluated. This data base was used in preparing complete Bouguer and isostatic gravity maps of the NTS and vicinity. Since publication of the complete Bouguer gravity map, additional data were incorporated into the isostatic gravity map. Gravity data were compiled from five sources: 14,183 stations from the US Geological Survey (USGS), 326 stations from Exploration Data Consultants (EDCON) of Denver, Colorado, 906 stations from the Los Alamos National Laboratory (LANL), 212 stations from the University of Texas at Dallas (UTD), and 48 stations from the Defense Mapping Agency (DMA). This investigation is an effort to study several areas for potential storage of high-level radioactive waste. Gravity stations established under YMP are shown. The objective of this gravity survey was to explore for the presence of plutons. This volume contains only compiled data

  13. Materials for the field test - students' attitudes to nuclear power stations

    International Nuclear Information System (INIS)

    Hoffmann, L.; Kattmann, U.; Lucht, H.; Spada, H.

    1975-01-01

    This working paper contains all the materials developed for and used in the field test of 'Student Attitudes toward Atomic Power Stations'. This research is a component of a larger project called 'Attitudes and Attitudes Change with Regard to Problems of Energy Supply and their Consequences for our Environment'. A central aim of this project is the development of instrumental strategies enabling the student to build up in this field a critically reflective and active behavior and attitudes based on sound problem consciousness. These instrumental strategies are derived from theories of social, learning and environmental psychology. A concrete result of these efforts are the materials of the field test mentioned above. They include: a) The draft of an instructional unit 'Atomic Power Stations - Prosperity or Disaster' with - a booklet on the subject matter for students and teachers - a paper on the contents of the instructional unit and their sequence - information for the students concerning the aims of the investigation - working materials for the students - reading materials for the teachers informing them about the proposed instructional strategies based on the psychological theories: (1) model-learning and the structuring of knowledge, (2) how to activate and motivate students, (3) the stabilization of attitudes and (4) small group work. b) Instruments for testing and observation. These instruments were used within a criterion-oriented evaluation and for a test of the effects of the different proposed items used in the instruction. (orig./HP) [de

  14. Development of virtual bait stations to control Argentine ants (Hymenoptera: Formicidae) in environmentally sensitive habitats.

    Science.gov (United States)

    Choe, Dong-Hwan; Vetter, Richard S; Rust, Michael K

    2010-10-01

    A novel bait station referred to as a virtual bait station was developed and tested against field populations of the invasive Argentine ant, Linepithema humile (Mayr) (Hymenoptera: Formicidae), at White Beach, Camp Pendleton, in Oceanside, CA. White Beach is a nesting habitat for an endangered seabird, the California least tern (Sterna antillarum browni Mearns). The beach is heavily infested with Argentine ants, one of the threats for the California least tern chicks. Conventional pest control strategies are prohibited because of the existence of the protected bird species and the site's proximity to the ocean. The bait station consisted of a polyvinyl chloride pipe that was treated on the inside with fipronil insecticide at low concentrations to obtain delayed toxicity against ants. The pipe was provisioned with an inverted bottle of 25% sucrose solution, then capped, and buried in the sand. Foraging ants crossed the treated surface to consume the sucrose solution. The delayed toxicity of fipronil deposits allowed the ants to continue foraging on the sucrose solution and to interact with their nestmates, killing them within 3-5 d after exposure. Further modification of the bait station design minimized the accumulation of dead ants in the sucrose solution, significantly improving the longevity and efficacy of the bait station. The virtual bait station exploits the foraging behavior of the ants and provides a low impact approach to control ants in environmentally sensitive habitats. It excluded all insects except ants, required only milligram quantities of toxicant, and eliminated the problem of formulating toxicants into aqueous sugar baits.

  15. Summary of ROSA-4 LSTF first phase test program and station blackout (TMLB) test results

    International Nuclear Information System (INIS)

    Tasaka, K.; Kukita, Y.; Anoda, Y.

    1990-01-01

    This paper summarizes major test results obtained at the ROSA-4 Large Scale Test Facility (LSTF) during the first phase of the test program. The results from a station blackout (TMLB) test conducted at the end of the first-phase program are described in some detail. The LSTF is an integral test facility being operated by the Japan Atomic Energy Research Institute for simulation of pressurized water reactor (PWR) thermal-hydraulic responses during small-break loss-of-coolant accidents (SBLOCAs) and operational/abnormal transients. It is a 1/48 volumetrically scaled, full-height, full-pressure simulator of a Westinghouse-type 4-loop PWR. The facility includes two symmetric primary loops each one containing an active inverted-U tube steam generator and an active reactor coolant pump. The loop horizontal legs are sized to conserve the scaled (1/24) volumes as well as the length to the square root of the diameter ratio in order to simulate the two-phase flow regime transitions. The primary objective of the LSTF first-phase program was to define the fundamental PWR thermal-hydraulic responses during SBLOCAs and transients. Most of the tests were conducted with simulated component/operator failures, including unavailability of the high pressure injection system and auxiliary feedwater system, as well as operator failure to take corrective actions. The forty-two first phase tests included twenty-nine SBLOCA tests conducted mainly for cold leg breaks, three abnormal transient tests and ten natural circulation tests. Attempts were made in several of the SBLOCA tests to simulate the plant recovery procedures as well as candidate accident management measures for prevention of high-pressure core melt situation. The natural circulation tests simulated the single-phase and two-phase natural circulation as well as reflux condensation behavior in the primary loops in steady or quasi-steady states

  16. Definition of satellite servicing technology development missions for early space stations. Volume 2: Technical

    Science.gov (United States)

    1983-01-01

    Early space station accommodation, build-up of space station manipulator capability, on-orbit spacecraft assembly test and launch, large antenna structure deployment, service/refurbish satellite, and servicing of free-flying materials processing platform are discussed.

  17. Development of an Open Source, Air-Deployable Weather Station

    Science.gov (United States)

    Krejci, A.; Lopez Alcala, J. M.; Nelke, M.; Wagner, J.; Udell, C.; Higgins, C. W.; Selker, J. S.

    2017-12-01

    We created a packaged weather station intended to be deployed in the air on tethered systems. The device incorporates lightweight sensors and parts and runs for up to 24 hours off of lithium polymer batteries, allowing the entire package to be supported by a thin fiber. As the fiber does not provide a stable platform, additional data (pitch and roll) from typical weather parameters (e.g. temperature, pressure, humidity, wind speed, and wind direction) are determined using an embedded inertial motion unit. All designs are open sourced including electronics, CAD drawings, and descriptions of assembly and can be found on the OPEnS lab website at http://www.open-sensing.org/lowcost-weather-station/. The Openly Published Environmental Sensing Lab (OPEnS: Open-Sensing.org) expands the possibilities of scientific observation of our Earth, transforming the technology, methods, and culture by combining open-source development and cutting-edge technology. New OPEnS labs are now being established in India, France, Switzerland, the Netherlands, and Ghana.

  18. Diagnostic testing and repair of Hollingsworth Generating Station`s Unit One

    Energy Technology Data Exchange (ETDEWEB)

    Atkins, R.; Epple, W.; Stevenson, D. [Great Lakes Power Ltd., Sault Ste. Marie, ON (Canada); Brotherton, L.; Crahan, M.; Ghate, A.

    1995-12-31

    A case history of the diagnosis and corrections implemented to resolve vibration problems in a 22,222 kVA hydroelectric generator was presented. The problem prevented the utility from operating the unit throughout the range of its nameplate rating and caused periodic failures of the generator`s guide and thrust bearing. Tests identified that the rim assembly was fastened onto the spider in a manner that resulted in tilting of the rim with respect to the axis of rotation, consequently, there was an unbalanced generator static air gap. A unique repair was implemented to fully restore the rim assembly to its proper position. Problems associated with carrying out such major in-situ repairs in a remote environment and within a scheduled maintenance outage were discussed. Economic benefits and costs associated with the repair were also discussed.

  19. Definition of technology development missions for early space stations. Large space structures, phase 2, midterm review

    Science.gov (United States)

    1984-01-01

    The large space structures technology development missions to be performed on an early manned space station was studied and defined and the resources needed and the design implications to an early space station to carry out these large space structures technology development missions were determined. Emphasis is being placed on more detail in mission designs and space station resource requirements.

  20. Hydrogeological investigations in two boreholes in the Stripa test station

    International Nuclear Information System (INIS)

    Hansson, K.; Almen, K.-E.; Ekman, L.

    1978-01-01

    The investigations included the following: water injection tests in a horizontal core-borehole, Dbh 2; hydrostatic pressure tests in Dbh2; determination of permeability in a vertical core-borehole, Dbh VI. The results of the water injection tests gave very little information due to the fact, that an air cushion was trapped in the borehole. The hydrostatic pressure tests in Dbh 2 were made in that part of the borehole, which is situated beyond the drift (45 - 97 m). Most of the pressure curves were difficult to interpret. The hydrostatic pressure in the section 89 - 97 m (end of the hole) was calculated to 1,67 Mpa. Near the end of the drift (46.00 - 49.71 m) the pressure was 0.22 Mpa. The permeability tests in Dbh VI were performed by measuring the water-flow and hydrostatic pressure in different levels. The calculated average permeability was 6.5x10 -10 m/s

  1. Space station operations task force. Panel 3 report: User development and integration

    Science.gov (United States)

    1987-01-01

    The User Development and Integration Panel of the Space Station Operations Task Force was chartered to develop concepts relating to the operations of the Space Station manned base and the platforms, user accommodation and integration activities. The needs of the user community are addressed in the context with the mature operations phase of the Space Station. Issues addressed include space station pricing options, marketing strategies, payload selection and resource allocation options, and manifesting techniques.

  2. On the development of small nuclear power stations

    International Nuclear Information System (INIS)

    Goetzmann, C.A.

    1989-01-01

    There are weighty reasons for and against the building of small nuclear power stations. Factors such as specific investment costs, opportunities for and areas of application, geographical conditions as well as those relating to infrastructure, security and availability play an important role in the planning, construction and running of a nuclear power station. For the usual large power stations, the comparatively low specific investment costs and a proven technology are favorable factors which minimize the investment risk. The article presents an overview of reasons for using small power stations and also considers the difficulties which would arise in practice. (orig.) [de

  3. Realization of station for testing asynchronous three-phase motors

    Science.gov (United States)

    Wróbel, A.; Surma, W.

    2016-08-01

    Nowadays, you cannot imagine the construction and operation of machines without the use of electric motors [13-15]. The proposed position is designed to allow testing of asynchronous three-phase motors. The position consists of a tested engine and the engine running as a load, both engines combined with a mechanical clutch [2]. The value of the load is recorded by measuring shaft created with Strain Gauge Bridge. This concept will allow to study the basic parameters of the engines, visualization motor parameters both vector and scalar controlled, during varying load drive system. In addition, registration during the variable physical parameters of the working electric motor, controlled by a frequency converter or controlled by a contactor will be possible. Position is designed as a teaching and research position to characterize the engines. It will be also possible selection of inverter parameters.

  4. Space-Based Reconfigurable Software Defined Radio Test Bed Aboard International Space Station

    Science.gov (United States)

    Reinhart, Richard C.; Lux, James P.

    2014-01-01

    The National Aeronautical and Space Administration (NASA) recently launched a new software defined radio research test bed to the International Space Station. The test bed, sponsored by the Space Communications and Navigation (SCaN) Office within NASA is referred to as the SCaN Testbed. The SCaN Testbed is a highly capable communications system, composed of three software defined radios, integrated into a flight system, and mounted to the truss of the International Space Station. Software defined radios offer the future promise of in-flight reconfigurability, autonomy, and eventually cognitive operation. The adoption of software defined radios offers space missions a new way to develop and operate space transceivers for communications and navigation. Reconfigurable or software defined radios with communications and navigation functions implemented in software or VHDL (Very High Speed Hardware Description Language) provide the capability to change the functionality of the radio during development or after launch. The ability to change the operating characteristics of a radio through software once deployed to space offers the flexibility to adapt to new science opportunities, recover from anomalies within the science payload or communication system, and potentially reduce development cost and risk by adapting generic space platforms to meet specific mission requirements. The software defined radios on the SCaN Testbed are each compliant to NASA's Space Telecommunications Radio System (STRS) Architecture. The STRS Architecture is an open, non-proprietary architecture that defines interfaces for the connections between radio components. It provides an operating environment to abstract the communication waveform application from the underlying platform specific hardware such as digital-to-analog converters, analog-to-digital converters, oscillators, RF attenuators, automatic gain control circuits, FPGAs, general-purpose processors, etc. and the interconnections among

  5. Photovoltaic power generation field test at Saigo Police Station (police station in a heavy-snow district); Saigo keisatsusho taiyoko hatsuden field test jigyo (sekisetsu chiku no keisatsusho)

    Energy Technology Data Exchange (ETDEWEB)

    Matsuo, S. [Shimane Prefectural Police Department, Shimane (Japan)

    1997-05-30

    Contents of a fiscal 1996 photovoltaic power generation field test at a police station in a heavy-snow district are reported. The system is on the rooftop of the garage of Saigo Police Station, Saigo-cho, Shimane Prefecture, and is used for lighting, airconditioning, etc., in the police station. It is 15kW in capacity and operates on high-voltage interconnection (with back flow). The array is a 9-series/17-parallel (polycrystalline modules) system, facing 15deg eastward from due south and inclined at an angle of elevation of 17deg. Dead space on the roof is used for solar cell installation, and the applicability and stability of the photovoltaic power generation system, as installed at a police station in a heavy-snow district, were verified and, at the same, operation data were collected. The data will serve as guidelines for construction in the future, and will enable understanding about how a distributed type power generation plant should be on an isolated island. The compilation of various data about its system interconnection (with back flow) with the commercial power source is meaningful because it will work effectively in popularizing the photovoltaic power generation system. Efforts to appeal to the local population are under way, which includes letting visitors into a terrace, distributing advertising pamphlets, etc., which are quite effective in enlightening people of the new energy producing technology

  6. Development situation about the Canadian CANDU Nuclear Power Generating Stations

    Energy Technology Data Exchange (ETDEWEB)

    Jeon, Yu Mi; Kim, Yong Hee; Park, Joo Hwan

    2009-07-15

    The CANDU reactor is the most versatile commercial power reactor in the world. The acronym 'CANDU', a registered trademark of Atomic Energy of Canada Limited, stands for 'CANada Deuterium Uranium'. CANDU uses heavy water as moderator and uranium (originally, natural uranium) as fuel. All current power reactors in Canada are of the CANDU type. Canada exports CANDU type reactor in abroad. CANDU type is used as the nuclear power plants to produce electrical. Today, there are 41 CANDU reactors in use around the world, and the design has continuously evolved to maintain into unique technology and performance. The CANDU-6 power reactor offers a combination of proven, superior and state-of-the-art technology. CANDU-6 was designed specifically for electricity production, unlike other major reactor types. One of its characteristics is a very high operating and fuel efficiency. Canada Nuclear Power Generating Stations were succeeded in a commercial reactor of which the successful application of heavy water reactor, natural uranium method and that on-power fuelling could be achieved. It was achieved through the joint development of a major project by strong support of the federal government, public utilities and private enterprises. The potential for customization to any country's needs, with competitive development and within any level of domestic industrial infrastructure, gives CANDU technology strategic importance in the 21st century.

  7. Development of REFLA/TRAC code for engineering work station

    International Nuclear Information System (INIS)

    Ohnuki, Akira; Akimoto, Hajime; Murao, Yoshio

    1994-03-01

    The REFLA/TRAC code is a best-estimate code which is expected to check reactor safety analysis codes for light water reactors (LWRs) and to perform accident analyses for LWRs and also for an advanced LWR. Therefore, a high predictive capability is required and the assessment of each physical model becomes important because the models govern the predictive capability. In the case of the assessment of three-dimensional models in REFLA/TRAC code, a conventional large computer is being used and it is difficult to perform the assessment efficiently because the turnaround time for the calculation and the analysis is long. Then, a REFLA/TRAC code which can run on an engineering work station (EWS) was developed. Calculational speed of the current EWS is the same order as that of large computers and the EWS has an excellent function for multidimensional graphical drawings. Besides, the plotting processors for X-Y drawing and for two-dimensional graphical drawing were developed in order to perform efficient analyses for three-dimensional calculations. In future, we can expect that the assessment of three-dimensional models becomes more efficient by introducing an EWS with higher calculational speed and with improved graphical drawings. In this report, each outline for the following three programs is described: (1) EWS version of REFLA/TRAC code, (2) Plot processor for X-Y drawing and (3) Plot processor for two-dimensional graphical drawing. (author)

  8. Development situation about the Canadian CANDU Nuclear Power Generating Stations

    International Nuclear Information System (INIS)

    Jeon, Yu Mi; Kim, Yong Hee; Park, Joo Hwan

    2009-07-01

    The CANDU reactor is the most versatile commercial power reactor in the world. The acronym 'CANDU', a registered trademark of Atomic Energy of Canada Limited, stands for 'CANada Deuterium Uranium'. CANDU uses heavy water as moderator and uranium (originally, natural uranium) as fuel. All current power reactors in Canada are of the CANDU type. Canada exports CANDU type reactor in abroad. CANDU type is used as the nuclear power plants to produce electrical. Today, there are 41 CANDU reactors in use around the world, and the design has continuously evolved to maintain into unique technology and performance. The CANDU-6 power reactor offers a combination of proven, superior and state-of-the-art technology. CANDU-6 was designed specifically for electricity production, unlike other major reactor types. One of its characteristics is a very high operating and fuel efficiency. Canada Nuclear Power Generating Stations were succeeded in a commercial reactor of which the successful application of heavy water reactor, natural uranium method and that on-power fuelling could be achieved. It was achieved through the joint development of a major project by strong support of the federal government, public utilities and private enterprises. The potential for customization to any country's needs, with competitive development and within any level of domestic industrial infrastructure, gives CANDU technology strategic importance in the 21st century

  9. Performance Evaluation of the International Space Station Flow Boiling and Condensation Experiment (FBCE) Test Facility

    Science.gov (United States)

    Hasan, Mohammad; Balasubramaniam, R.; Nahra, Henry; Mackey, Jeff; Hall, Nancy; Frankenfield, Bruce; Harpster, George; May, Rochelle; Mudawar, Issam; Kharangate, Chirag R.; hide

    2016-01-01

    A ground-based experimental facility to perform flow boiling and condensation experiments is built in support of the development of the long duration Flow Boiling and Condensation Experiment (FBCE) destined for operation on board of the International Space Station (ISS) Fluid Integrated Rack (FIR). We performed tests with the condensation test module oriented horizontally and vertically. Using FC-72 as the test fluid and water as the cooling fluid, we evaluated the operational characteristics of the condensation module and generated ground based data encompassing the range of parameters of interest to the condensation experiment to be performed on the ISS. During this testing, we also evaluated the pressure drop profile across different components of the fluid subsystem, heater performance, on-orbit degassing subsystem, and the heat loss from different components. In this presentation, we discuss representative results of performance testing of the FBCE flow loop. These results will be used in the refinement of the flight system design and build-up of the FBCE which is scheduled for flight in 2019.

  10. IEEE standard for type test of class 1E electric cables, field splices, and connections for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    The Institute of Electrical and Electronics Engineers has generated this document to provide guidance for developing a program to type test cables, field splices, and connections and obtain specific type test data. It supplements IEEE Std 323-1974 Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations, which describes basic requirements for equipment qualification. It is the integrated performance of the structures, fluid systems, the electrical systems, the instrumentation systems of the station, and in particular, the plant protection system, that limits the consequences of accidents. Seismic effects on installed cable systems are not within the scope of this document. Section 2 of this guide is an example of type tests. It is the purpose of this guide to deal with cable and connections; however, at the time of issue, detailed examples of tests for connections were not available

  11. Characterisation of a pneumatic muscle test station with two dynamic plants in cascade.

    Science.gov (United States)

    Serres, J L; Reynolds, D B; Phillips, C A; Rogers, D B; Repperger, D W

    2010-02-01

    Pneumatic muscle actuators (PMAs) offer significant advantages over more traditional actuators, which make them prime candidates in rehabilitation devices. A dynamic test station (DTS) is modified to demonstrate the use of a PMA for this application. The DTS includes two dynamic systems: a PMA and a DC servomotor. An overall transfer function was developed utilising characterisation data for the PMA and DC servomotor. A Tustin (bilinear) transform was performed on the overall transfer function to obtain a discrete time system. Model parameters were optimised and used to generate input voltage profiles that achieve isokinetic (constant velocity) task specifications. Percent root mean square error values (PRMSE) between the actual and ideal profiles were used to evaluate the accuracy of this method in achieving isokinetic displacement. For PMA pressures (in kPa) of 150, 350 and 550 PRMSE were 7.80, 5.40 and 2.76, respectively.

  12. Viking telecommunication effects of GEOS satellite interference based on testing at the Madrid deep space station

    Science.gov (United States)

    Stuhr, F. V.; Kent, S. S.; Galvez, J. L.; Luaces, B. G.; Pasero, G. R.; Urech, J. M.

    1976-01-01

    In support of the ongoing NASA-European Space Agency (ESA) effort to understand and control possible interference between missions, testing was conducted at the Madrid Deep Space Station from July 1975 to February 1976 to characterize the effect on Viking 1975 telecommunication link performance of Geodetic Earth-Orbiting Satellite (GEOS) downlink signals. The prime use of the data was to develop a capability to predict GEOS interference effects for evaluation of Viking 1975 mission impacts and possible temporary GEOS shutdown. Also, the data would serve as a basis for assessment of the GEOS impact on missions other than Viking as well as for more general interference applications. Performances of the reference receiver, telemetry, and planetary ranging were measured in the presence of various types of GEOS-related interference, including an unmodulated GEOS carrier and simulation of the actual spectrum by an ESA-supplied GEOS suitcase model.

  13. Comprehensive Test Ban Treaty (CTBT) monitoring station operating regime influence on radionuclide detection sensitivity

    International Nuclear Information System (INIS)

    Williams, D.L.

    1999-01-01

    International Monitoring System (IMS) stations are being deployed worldwide in support of the Comprehensive [Nuclear] Test Ban Treaty (CTBT). The highly sensitive radionuclide monitoring stations regularly sample airborne radionuclide particulates to determine whether fission products are present in the atmosphere that may be indicative of a nuclear weapons test. Standards have been set for these stations regarding their operation regime and the minimum detectable concentrations (MDCs) for specific radionuclides likely to be present after a nuclear weapons test. This study uses actual CTBT monitoring data to relate a subset of the specified operational standards with the listed MDC limits. It is determined that a relationship exists between the specified operational regime and the MDC values. Since the background radioactivity is largely a function of the radon and thoron progeny, longer decay operational regimes allow for a reduction in the background. For longer lived radionuclides, this corresponds to a reduction in MDC. (author)

  14. International Space Station (ISS) Emergency Mask (EM) Development

    Science.gov (United States)

    Toon, Katherine P.; Hahn, Jeffrey; Fowler, Michael; Young, Kevin

    2011-01-01

    The Emergency Mask (EM) is considered a secondary response emergency Personal Protective Equipment (PPE) designed to provide respiratory protection to the International Space Station (ISS) crewmembers in response to a post-fire event or ammonia leak. The EM is planned to be delivered to ISS in 2012 to replace the current air purifying respirator (APR) onboard ISS called the Ammonia Respirator (AR). The EM is a one ]size ]fits ]all model designed to fit any size crewmember, unlike the APR on ISS, and uses either two Fire Cartridges (FCs) or two Commercial Off-the-Shelf (COTS) 3M(Trademark). Ammonia Cartridges (ACs) to provide the crew with a minimum of 8 hours of respiratory protection with appropriate cartridge swap ]out. The EM is designed for a single exposure event, for either post ]fire or ammonia, and is a passive device that cannot help crewmembers who cannot breathe on their own. The EM fs primary and only seal is around the wearer fs neck to prevent a crewmember from inhaling contaminants. During the development of the ISS Emergency Mask, several design challenges were faced that focused around manufacturing a leak free mask. The description of those challenges are broadly discussed but focuses on one key design challenge area: bonding EPDM gasket material to Gore(Registered Trademark) fabric hood.

  15. Space station common module power system network topology and hardware development

    Science.gov (United States)

    Landis, D. M.

    1985-01-01

    Candidate power system newtork topologies for the space station common module are defined and developed and the necessary hardware for test and evaluation is provided. Martin Marietta's approach to performing the proposed program is presented. Performance of the tasks described will assure systematic development and evaluation of program results, and will provide the necessary management tools, visibility, and control techniques for performance assessment. The plan is submitted in accordance with the data requirements given and includes a comprehensive task logic flow diagram, time phased manpower requirements, a program milestone schedule, and detailed descriptions of each program task.

  16. Power transmission cable development for the Space Station Freedom electrical power system

    Science.gov (United States)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  17. Design and development of electric vehicle charging station equipped with RFID

    Science.gov (United States)

    Panatarani, C.; Murtaddo, D.; Maulana, D. W.; Irawan, S.; Joni, I. M.

    2016-02-01

    This paper reports the development of electric charging station from distributed renewable for electric vehicle (EV). This designed refer to the input voltage standard of IEC 61851, plugs features of IEC 62196 and standard communication of ISO 15118. The developed electric charging station used microcontroller ATMEGA8535 and RFID as controller and identifier of the EV users, respectively. The charging station successfully developed as desired features for electric vehicle from renewable energy resources grid with solar panel, wind power and batteries storage.

  18. Development and testing of a mobile incinerator

    International Nuclear Information System (INIS)

    Eggett, D.R.

    1986-01-01

    The development and testing of a mobile incinerator for processing of combustible dry active waste (DAW) and contaminated oil generated at Nuclear Power Plants is presented. Topics of discussion include initial thoughts on incineration as applied to nuclear waste; DOE's Aerojet's, and CECo's role in the Project; design engineering concepts; site engineering support; licensability; generation of test data; required reports of the NRC and Illinois and California EPA's; present project schedule for incinerating DAW at Dresden and other CECo Stations; and lessons learned from the project

  19. The SOS-LUX-LAC-FLUORO-Toxicity-test on the International Space Station (ISS).

    Science.gov (United States)

    Rabbow, E; Rettberg, P; Baumstark-Khan, C; Horneck, G

    2003-01-01

    In the 21st century, an increasing number of astronauts will visit the International Space Station (ISS) for prolonged times. Therefore it is of utmost importance to provide necessary basic knowledge concerning risks to their health and their ability to work on the station and during extravehicular activities (EVA) in free space. It is the aim of one experiment of the German project TRIPLE-LUX (to be flown on the ISS) to provide an estimation of health risk resulting from exposure of the astronauts to the radiation in space inside the station as well as during extravehicular activities on one hand, and of exposure of astronauts to unavoidable or as yet unknown ISS-environmental genotoxic substances on the other. The project will (i) provide increased knowledge of the biological action of space radiation and enzymatic repair of DNA damage, (ii) uncover cellular mechanisms of synergistic interaction of microgravity and space radiation and (iii) examine the space craft milieu with highly specific biosensors. For these investigations, the bacterial biosensor SOS-LUX-LAC-FLUORO-Toxicity-test will be used, combining the SOS-LUX-Test invented at DLR Germany (Patent) with the commercially available LAC-FLUORO-Test. The SOS-LUX-Test comprises genetically modified bacteria transformed with the pBR322-derived plasmid pPLS-1. This plasmid carries the promoterless lux operon of Photobacterium leiognathi as a reporter element under control of the DNA-damage dependent SOS promoter of ColD as sensor element. This system reacts to radiation and other agents that induce DNA damages with a dose dependent measurable emission of bioluminescence of the transformed bacteria. The analogous LAC-FLUORO-Test has been developed for the detection of cellular responses to cytotoxins. It is based on the constitutive expression of green fluorescent protein (GFP) mediated by the bacterial protein expression vector pGFPuv (Clontech, Palo Alto, USA). In response to cytotoxic agents, this system

  20. In situ testing of the Shippingport Atomic Power Station electrical circuits

    International Nuclear Information System (INIS)

    Dinsel, M.R.; Donaldson, M.R.; Soberano, F.T.

    1987-04-01

    This report discusses the results of electrical in situ testing of selected circuits and components at the Shippingport Atomic Power Station in Shippingport, Pennsylvania. Testing was performed by EG and G Idaho in support of the United States Nuclear Regulatory Commission (USNRC) Nuclear Plant Aging Research (NPAR) Program. The goal was to determine the extent of aging or degradation of various circuits from the original plant, and the two major coreplant upgrades (representing three distinct age groups), as well as to evaluate previously developed surveillance technology. The electrical testing was performed using the Electrical Circuit Characterization and Diagnostic (ECCAD) system developed by EG and G for the US Department of Energy to use at TMI-2. Testing included measurements of voltage, effective series capacitance, effective series inductance, impedance, effective series resistance, dc resistance, insulation resistance and time domain reflectometry (TDR) parameters. The circuits evaluated included pressurizer heaters, control rod position indicator cables, miscellaneous primary system Resistance Temperature Detectors (RTDs), nuclear instrumentation cables, and safety injection system motor operated valves. It is to be noted that the operability of these circuits was tested after several years had elapsed because plant operations had concluded at Shippingport. There was no need following plant shutdown to retain the circuits in working condition, so no effort was expended for that purpose. The in situ measurements and analysis of the data confirmed the effectiveness of the ECCAD system for detecting degradation of circuit connections and splices because of high resistance paths, with most of the problems caused by corrosion. Results indicate a correlation between the chronological age of circuits and circuit degradation

  1. Realisation and instrumentation of high current power station for superconducting cables testing

    International Nuclear Information System (INIS)

    Regnaud, S.

    2000-05-01

    This report deals with the designing of a high current station able to test electric properties of superconductors. This test station will be used for testing the superconducting wires of large hadron collider detectors in CERN. The high current test station will have to generate high intensity continuous current in a magnetic field of 0 to 5 tesla and in temperature conditions of 4.2 K. The length of wire samples submitted to the uniform magnetic field is 300 mm and the installation is fitted with equipment able to measure the magnetic field perpendicular to either faces of the wire. The peculiarity of this station is to use a superconducting transformer in order to generate the high current. The first part of this work recalls important notions concerning superconductivity. The second part presents the high current station by describing the superconducting transformer and the sample-holder. We have studied the designing of a transformer able to yield a secondary current whose intensity reaches 100 kA, such intensity generates powerful electromagnetic forces (566 kN/m) in case of defect, so the sample-holder has to be carefully design to bear them. The third part presents the cryogenic component of the station, the instrumentation of the sample-holder and the method used to measure secondary currents. In the last part we present the performance of a prototype transformer, this prototype is able to deliver a 22 kA secondary current for a 160 A primary current, the uncertainty on the measured value of the secondary current is about 3%

  2. Space Station flight telerobotic servicer functional requirements development

    Science.gov (United States)

    Oberright, John; Mccain, Harry; Whitman, Ruth I.

    1987-01-01

    The Space Station flight telerobotic servicer (FTS), a flight robotic system for use on the first Space Station launch, is described. The objectives of the FTS program include: (1) the provision of an alternative crew EVA by supporting the crew in assembly, maintenance, and servicing activities, and (2) the improvement of crew safety by performing hazardous tasks such as spacecraft refueling or thermal and power system maintenance. The NASA/NBS Standard Reference Model provides the generic, hierarchical, structured functional control definition for the system. It is capable of accommodating additional degrees of machine intelligence in the future.

  3. Research on efficiency test of a turbine in Khan Khwar hydropower station

    International Nuclear Information System (INIS)

    Zhang, H K; Liang, Z; Deng, M G; Liu, X B; Wang, H Y; Liu, D M

    2012-01-01

    The efficiency test is an important indicator to evaluate the energy conversion performance of a hydraulic turbine. For hydropower stations which do not have the direct flow measurement conditions, whether the characteristic curve of a turbine obtained through similarity theory conversion by using the comprehensive characteristic curve of the turbine can correctly reflect the operating performance of the prototype unit is a key issue in this industry. By taking the No.1 unit of Khan Khwar hydropower station as the example, the efficiency test of this turbine was studied on the site, including the measurement method of test parameters, the configuration of the computer test system, as well as the processing and analysis of test data.

  4. A survey on the history of developing nuclear power station in Hunan Province

    International Nuclear Information System (INIS)

    Ren Dexi

    1993-01-01

    Sixteen years ago it was suggested that a nuclear power station should be built in Hunan Province, and a special document was reported to the State Council. Up to now, the idea has still been under consideration. The author discusses the development of nuclear power station in Hunan province. It mainly consists of four parts: the history, the necessity the barriers met in the course and the feasible way of developing nuclear power station in Hunan Province

  5. Space Station Freedom environmental control and life support system phase 3 simplified integrated test detailed report

    Science.gov (United States)

    Roberts, B. C.; Carrasquillo, R. L.; Dubiel, M. Y.; Ogle, K. Y.; Perry, J. L.; Whitley, K. M.

    1990-01-01

    A description of the phase 3 simplified integrated test (SIT) conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) in 1989 is presented. This was the first test in the phase 3 series integrated environmental control and life support systems (ECLSS) tests. The basic goal of the SIT was to achieve full integration of the baseline air revitalization (AR) subsystems for Space Station Freedom. Included is a description of the SIT configuration, a performance analysis of each subsystem, results from air and water sampling, and a discussion of lessons learned from the test. Also included is a full description of the preprototype ECLSS hardware used in the test.

  6. Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2002-04-01

    Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

  7. Strength assessment of a cryostat used by the hollow electron test station.

    CERN Document Server

    Efremov, Filip

    2015-01-01

    The following report explains the work I have done on my summer student work project and the experience I have gained during the process. The work consisted of a strength assessment of a cryogenic vacuum insulated vessel according to European regulations. The cryogenic vacuum insulated vessel is used for the cooling of the solenoids. The solenoids are used in the hollow electron test station and create the magnetic fields used for testing electron guns and validating the concept of a hollow electron lens.

  8. Definition of technology development missions for early space station satellite servicing, volume 1

    Science.gov (United States)

    1983-01-01

    The testbed role of an early manned space station in the context of a satellite servicing evolutionary development and flight demonstration technology plan which results in a satellite servicing operational capability is defined. A satellite servicing technology development mission (a set of missions) to be performed on an early manned space station is conceptually defined.

  9. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of shaft liner tests as part of the large shaft development test proposed for the Hanford Site in support of the repository development program. The objectives of these tests are to develop techniques for measuring liner alignment (straightness), both construction assembly alignment and downhole cumulative alignment, and to assess the alignment information as a real time feedback to aid the installation procedure. The test plan is based upon installing a 16 foot ID shaft liner into a 20 foot diameter shaft to a depth of 1000 feet. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs

  10. Signal Processing for Indian and Pakistan Nuclear Tests Recorded at IMS Stations Located in Israel

    Science.gov (United States)

    Gitterman, Y.; Pinsky, V.; Hofstetter, R.

    - In compliance with the Comprehensive Nuclear-Test-Ban-Treaty (CTBT) the International Monitoring System (IMS) was designed for detection and location of the clandestine Nuclear Tests (NT). Two auxiliary IMS seismic stations MRNI and EIL, deployed recently, were subjected to detectability, travel-time calibration and discrimination analysis. The study is based on the three recent 1998 underground nuclear explosions: one of India and two of Pakistan, which provided a ground-truth test of the existing IMS. These events, attaining magnitudes of 5.2, 4.8 and 4.6 correspondingly, were registered by many IMS and other seismic stations.The MRNI and EIL broadband (BB) stations are located in Israel at teleseismic distances (from the explosions) of 3600, 2800 and 2700km, respectively, where the signals from the tests are already weak. The Indian and the second Pakistan NT were not detected by the short-period Israel Seismic Network (ISN), using standard STA/LTA triggering. Therefore, for the chosen IMS stations we compare the STA/LTA response to the results of the more sensitive Murdock-Hutt (MH) and the Adaptive Statistically Optimal Detector (OD) that showed triggering for these three events. The second Pakistan NT signal arrived at the ISN and the IMS stations in the coda of a strong Afghanistan earthquake and was further disturbed by a preceding signal from a local earthquake. However, the NT signal was successfully extracted at EIL and MRNI stations using MH and OD procedures. For comparison we provide the signal analysis of the cooperating BB station JER, with considerably worse noise conditions than EIL and MRNI, and show that OD can detect events when the other algorithms fail. Using the most quiet EIL station, the most sensitive OD and different bandpass filters we tried in addition to detect the small Kazakh chemical 100-ton calibration explosion of 1998, with magnitude 3.7 at a distance approaching 4000km. The detector response curve showed uprising in the

  11. Integrated management model. Methodology and software-enabled tood designed to assist a utility in developing a station-wide optimization

    International Nuclear Information System (INIS)

    Llovet, R.; Ibanez, R.; Woodcock, J.

    2005-01-01

    A key concern for utilities today is optimizing station aging and realibility management activities in a manner that maximizes the value of those activities withing an affordable budget. The Westinghouse Proactive Asset Management Model is a methodology and software-enabled tood designed to assist a utility in developing a station-wide optimization of those activities. The process and tool support the development of an optimized, station-wide plan for inspection, testing, maintenance, repaor and replacement of aging components. The optimization identifies the benefit and optimal timing of those activities based on minimizing unplanned outage costs (avoided costs) and maximizing station Net Present Value. (Author)

  12. Addressing Challenges to the Design & Test of Operational Lighting Environments for the International Space Station

    Science.gov (United States)

    Clark, Toni A.

    2014-01-01

    In our day to day lives, the availability of light, with which to see our environment, is often taken for granted. The designers of land based lighting systems use sunlight and artificial light as their toolset. The availability of power, quantity of light sources, and variety of design options are often unlimited. The accessibility of most land based lighting systems makes it easy for the architect and engineer to verify and validate their design ideas. Failures with an implementation, while sometimes costly, can easily be addressed by renovation. Consider now, an architectural facility orbiting in space, 260 miles above the surface of the earth. This human rated architectural facility, the International Space Station (ISS) must maintain operations every day, including life support and appropriate human comforts without fail. The facility must also handle logistics of regular shipments of cargo, including new passengers. The ISS requires accommodations necessary for human control of machine systems. Additionally, the ISS is a research facility and supports investigations performed inside and outside its livable volume. Finally, the facility must support remote operations and observations by ground controllers. All of these architectural needs require a functional, safe, and even an aesthetic lighting environment. At Johnson Space Center, our Habitability and Human Factors team assists our diverse customers with their lighting environment challenges, via physical test and computer based analysis. Because of the complexity of ISS operational environment, our team has learned and developed processes that help ISS operate safely. Because of the dynamic exterior lighting environment, uses computational modeling to predict the lighting environment. The ISS' orbit exposes it to a sunrise every 90 minutes, causing work surfaces to quickly change from direct sunlight to earthshine to total darkness. Proper planning of vehicle approaches, robotics operations, and crewed

  13. A Low Heat Inleak Cryogenic Station for Testing HTS Current Leads for the Large Hadron Collider

    CERN Document Server

    Ballarino, A; Gomes, P; Métral, L; Serio, L; Suraci, A

    1999-01-01

    The LHC will be equipped with about 8000 superconducting magnets of all types. The total current to be transported into the cryogenic enclosure amounts to some 3360 kA. In order to reduce the heat load into the liquid helium, CERN intends to use High Temperature Superconducting (HTS) material for leads having current ratings up to 13 kA. The resistive part of the leads is cooled by forced flow of gaseous helium between 20 K and 300 K. The HTS part of the lead is immersed in a 4.5 K liquid helium bath, operates in self cooling conditions and is hydraulically separated from the resistive part. A cryogenic test station has been designed and built in order to assess the thermal and electrical performances of 13 kA prototype current leads. We report on the design, commissioning and operation of the cryogenic test station and illustrate its performance by typical test results of HTS current leads.

  14. Evaluation of speech recognizers for use in advanced combat helicopter crew station research and development

    Science.gov (United States)

    Simpson, Carol A.

    1990-01-01

    The U.S. Army Crew Station Research and Development Facility uses vintage 1984 speech recognizers. An evaluation was performed of newer off-the-shelf speech recognition devices to determine whether newer technology performance and capabilities are substantially better than that of the Army's current speech recognizers. The Phonetic Discrimination (PD-100) Test was used to compare recognizer performance in two ambient noise conditions: quiet office and helicopter noise. Test tokens were spoken by males and females and in isolated-word and connected-work mode. Better overall recognition accuracy was obtained from the newer recognizers. Recognizer capabilities needed to support the development of human factors design requirements for speech command systems in advanced combat helicopters are listed.

  15. Noise test system of rotating machinery in nuclear power station based on microphone array

    Science.gov (United States)

    Chang, Xincai; Guan, Jishi; Qi, Liangcai

    2017-12-01

    Rotating machinery plays an important role in all walks of life. Once the equipment fails, equipment maintenance and shutdown will cause great social harm and economic losses. Equipment safety operations at nuclear power stations have always been of top priority. It is prone to noise when the equipment is out of order or aging. Failure to find or develop equipment at the initial stage of equipment failure or ageing will pose a serious threat to the safety of the plant’s equipment. In this paper, sound imaging diagnosis technology is applied as a supplementary method to the condition monitoring and diagnosis system of rotating machinery in nuclear power stations. It provides a powerful guarantee for the condition monitoring and fault diagnosis of rotating machinery in nuclear power stations.

  16. Investigation of accident management procedures related to loss of feedwater and station blackout in PSB-VVER integral test facility

    Energy Technology Data Exchange (ETDEWEB)

    Bucalossi, A. [EC JRC, (JRC F.5) PO Box 2, 1755 ZG Petten (Netherlands); Del Nevo, A., E-mail: alessandro.delnevo@enea.it [ENEA, C.R. Brasimone, 40032 Camugnano (Italy); Moretti, F.; D' Auria, F. [GRNSPG, Universita di Pisa, via Diotisalvi 2, 56100 Pisa (Italy); Elkin, I.V.; Melikhov, O.I. [Electrogorsk Research and Engineering Centre, Electrogorsk, Moscow Region (Russian Federation)

    2012-09-15

    Highlights: Black-Right-Pointing-Pointer Four integral test facility experiments related to VVER-1000 reactor. Black-Right-Pointing-Pointer TH response of the VVER-1000 primary system following total loss of feedwater and station blackout scenarios. Black-Right-Pointing-Pointer Accident management procedures in case of total loss of feedwater and station blackout. Black-Right-Pointing-Pointer Experimental data represent an improvement of existing database for TH code validation. - Abstract: VVER 1000 reactors have some unique and specific features (e.g. large primary and secondary side fluid inventory, horizontal steam generators, core design) that require dedicated experimental and analytical analyses in order to assess the performance of safety systems and the effectiveness of possible accident management strategies. The European Commission funded project 'TACIS 2.03/97', Part A, provided valuable experimental data from the large-scale (1:300) PSB-VVER test facility, investigating accident management procedures in VVER-1000 reactor. A test matrix was developed at University of Pisa (responsible of the project) with the objective of obtaining the experimental data not covered by the OECD VVER validation matrix and with main focus on accident management procedures. Scenarios related to total loss of feed water and station blackout are investigated by means of four experiments accounting for different countermeasures, based on secondary cooling strategies and primary feed and bleed procedures. The transients are analyzed thoroughly focusing on the identification of phenomena that will challenge the code models during the simulations.

  17. Definition of technology development missions for early space station, orbit transfer vehicle servicing, volume 2

    Science.gov (United States)

    1983-01-01

    Propellant transfer, storage, and reliquefaction TDM; docking and berthing technology development mission; maintenance technology development mission; OTV/payload integration, space station interface/accommodations; combined TDM conceptual design; programmatic analysis; and TDM equipment usage are discussed.

  18. Hot Cell Installation and Demonstration of the Severe Accident Test Station

    Energy Technology Data Exchange (ETDEWEB)

    Linton, Kory D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Burns, Zachary M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Terrani, Kurt A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Yan, Yong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-08-01

    A Severe Accident Test Station (SATS) capable of examining the oxidation kinetics and accident response of irradiated fuel and cladding materials for design basis accident (DBA) and beyond design basis accident (BDBA) scenarios has been successfully installed and demonstrated in the Irradiated Fuels Examination Laboratory (IFEL), a hot cell facility at Oak Ridge National Laboratory. The two test station modules provide various temperature profiles, steam, and the thermal shock conditions necessary for integral loss of coolant accident (LOCA) testing, defueled oxidation quench testing and high temperature BDBA testing. The installation of the SATS system restores the domestic capability to examine postulated and extended LOCA conditions on spent fuel and cladding and provides a platform for evaluation of advanced fuel and accident tolerant fuel (ATF) cladding concepts. This document reports on the successful in-cell demonstration testing of unirradiated Zircaloy-4. It also contains descriptions of the integral test facility capabilities, installation activities, and out-of-cell benchmark testing to calibrate and optimize the system.

  19. Start-up test of Fukushima Daini Nuclear Power Station Unit No.3

    International Nuclear Information System (INIS)

    Inomata, Toshio; Umezu, Akira; Kajikawa, Makoto; Koibuchi, Hiroshi; Netsu, Nobuhiko.

    1986-01-01

    In Unit 3 of the Fukushima Nuclear Power Station II (daini), a BWR power plant of output 1,100 MW, commercial operation was started in June 1985. Its start-up test was finished successfully in about nine months. That is, new equipments introduced were demonstration tested. Though the items of testing are increased, the start-up test took short time, resulting in construction period only 54.7 months of the Unit 3, the shortest in the world. During the test, there was no scramming other than the planned. Described are the following: an outline of the Unit 3, the items of its improvement and standardization, including the new equipments, preparations for the start-up test, the start-up test and its evaluation. (Mori, K.)

  20. An environmental testing facility for Space Station Freedom power management and distribution hardware

    Science.gov (United States)

    Jackola, Arthur S.; Hartjen, Gary L.

    1992-01-01

    The plans for a new test facility, including new environmental test systems, which are presently under construction, and the major environmental Test Support Equipment (TSE) used therein are addressed. This all-new Rocketdyne facility will perform space simulation environmental tests on Power Management and Distribution (PMAD) hardware to Space Station Freedom (SSF) at the Engineering Model, Qualification Model, and Flight Model levels of fidelity. Testing will include Random Vibration in three axes - Thermal Vacuum, Thermal Cycling and Thermal Burn-in - as well as numerous electrical functional tests. The facility is designed to support a relatively high throughput of hardware under test, while maintaining the high standards required for a man-rated space program.

  1. Preliminary results for HIP bonding Ta to W targets for the materials test station

    Energy Technology Data Exchange (ETDEWEB)

    Dombrowski, David E [Los Alamos National Laboratory; Maloy, Stuart A [Los Alamos National Laboratory

    2009-01-01

    Tungsten targets for the Materials Test Station (MTS) were clad with thin tantalum cover plates and a tantalum frame using hot isostatic pressing (HIP). A preliminary HIP parameter study showed good bonding and intimate mechanical contact for Ta cover plate thicknesses of 0.25 mm (0.010 inch) and 0.38 mm (0.015 inch). HIP temperatures of full HIP runs were 1500 C (2732 F). HIP pressure was 203 MPa (30 ksi).

  2. Development of low head Kaplan turbine for power station rehabilitation project

    Science.gov (United States)

    Lim, S. M.; Ohtake, N.; Kurosawa, S.; Suzuki, T.; Yamasaki, T.; Nishi, H.

    2012-11-01

    This paper presents the latest Kaplan turbine rehabilitation project for Funagira Power Station in Japan completed by J-POWER Group in collaboration with Toshiba Corporation. Area of rehabilitation was restricted to guide vane and runner. The main goal of the rehabilitation project was to expand the operating range of the existing turbine in terms of discharge and power with high operational stability, low noise as well as high cavitation performance. Computational Fluids Dynamics and model test were used to optimize the shape of guide vane and runner in development stage. Finally, field tests and runner inspection were carried out to confirm the performance of the new turbine. It was found that the new turbine has excellent performance in efficiency, power output, operational stability compared with existing turbine. Moreover, no sign of cavitation on the runner blade surface was observed after 5078 hours of operation near 100% load.

  3. Development of low head Kaplan turbine for power station rehabilitation project

    International Nuclear Information System (INIS)

    Lim, S M; Ohtake, N; Kurosawa, S; Suzuki, T; Yamasaki, T; Nishi, H

    2012-01-01

    This paper presents the latest Kaplan turbine rehabilitation project for Funagira Power Station in Japan completed by J-POWER Group in collaboration with Toshiba Corporation. Area of rehabilitation was restricted to guide vane and runner. The main goal of the rehabilitation project was to expand the operating range of the existing turbine in terms of discharge and power with high operational stability, low noise as well as high cavitation performance. Computational Fluids Dynamics and model test were used to optimize the shape of guide vane and runner in development stage. Finally, field tests and runner inspection were carried out to confirm the performance of the new turbine. It was found that the new turbine has excellent performance in efficiency, power output, operational stability compared with existing turbine. Moreover, no sign of cavitation on the runner blade surface was observed after 5078 hours of operation near 100% load.

  4. Development of the urban space surrounding selected railway stations in Poland

    Directory of Open Access Journals (Sweden)

    Dragan Weronika

    2017-12-01

    Full Text Available At present, many railway stations, in spite of being architecturally valuable, are subject to de-capitalization and degradation, which increasingly leads to demolition including elements or even entire railway stations of historical importance. Therefore, there arises a need to transform these facilities – as well as their nearby surroundings – into service areas not only for railway passengers but also for the consumer or tourist. This article presents an overview of the types of development of functional and spatial areas around a railway station, as well as the building itself, on selected examples in cities of Poland. In past historical periods, the surroundings of railway stations often became the new core of the studied centres, creating new urban structures. Train station forecourts, as well as access roads leading to railway stations, became specific links of railway infrastructure, the main points of which were railway stations, with the original urban layout. Unfortunately, the decline in the importance of rail transport has contributed to the recession and degradation of these spaces, and often to changes in their functions. This article refers to the concept of redevelopment of the railway station area, which emphasizes the creation of hubs integrating various modes of transport on the one hand, and transforming the area around the stations into an area of development of new business activities, on the other. Some of the discussed train stations have undergone a thorough renovation (e.g. Kraków Główny, Katowice and Poznań Główny, frequently in an attempt to allude to global trends in the commercialization of space and transport integration within station squares. However, this poses a problem and a challenge for decision-makers attempting to redevelop such facilities and the spaces associated with them.

  5. Development and Performance of the Alaska Transportable Array Posthole Broadband Seismic Station

    Science.gov (United States)

    Aderhold, K.; Enders, M.; Miner, J.; Bierma, R. M.; Bloomquist, D.; Theis, J.; Busby, R. W.

    2017-12-01

    The final stations of the Alaska Transportable Array (ATA) will be constructed in 2017, completing the full footprint of 280 new and existing broadband seismic stations stretching across 19 degrees of latitude from western Alaska to western Canada. Through significant effort in planning, site reconnaissance, permitting and the considerable and concerted effort of field crews, the IRIS Alaska TA team is on schedule to successfully complete the construction of 194 new stations and upgrades at 28 existing stations over four field seasons. The station design and installation method was developed over the course of several years, leveraging the experience of the L48 TA deployments and existing network operators in Alaska as well as incorporating newly engineered components and procedures. A purpose-built lightweight drill was designed and fabricated to facilitate the construction of shallow boreholes to incorporate newly available posthole seismometers. This allowed for the development of a streamlined system of procedures to manufacture uniform seismic stations with minimal crew and minimal time required at each station location. A new station can typically be constructed in a single day with a four-person field crew. The ATA utilizes a hammer-drilled, cased posthole emplacement method adapted to the remote and harsh working environment of Alaska. The same emplacement design is implemented in all ground conditions to preserve uniformity across the array and eliminate the need for specialized mechanical equipment. All components for station construction are ideally suited for transport via helicopter, and can be adapted to utilize more traditional methods of transportation when available. This emplacement design delivers high quality data when embedded in bedrock or permafrost, reaching the low noise levels of benchmark permanent global broadband stations especially at long periods over 70 seconds. The TA will operate the network of real-time stations through at least

  6. Design and development of a Space Station proximity operations research and development mockup

    Science.gov (United States)

    Haines, Richard F.

    1986-01-01

    Proximity operations (Prox-Ops) on-orbit refers to all activities taking place within one km of the Space Station. Designing a Prox-Ops control station calls for a comprehensive systems approach which takes into account structural constraints, orbital dynamics including approach/departure flight paths, myriad human factors and other topics. This paper describes a reconfigurable full-scale mock-up of a Prox-Ops station constructed at Ames incorporating an array of windows (with dynamic star field, target vehicle(s), and head-up symbology), head-down perspective display of manned and unmanned vehicles, voice- actuated 'electronic checklist', computer-generated voice system, expert system (to help diagnose subsystem malfunctions), and other displays and controls. The facility is used for demonstrations of selected Prox-Ops approach scenarios, human factors research (work-load assessment, determining external vision envelope requirements, head-down and head-up symbology design, voice synthesis and recognition research, etc.) and development of engineering design guidelines for future module interiors.

  7. Overview of software development at the parabolic dish test site

    Science.gov (United States)

    Miyazono, C. K.

    1985-01-01

    The development history of the data acquisition and data analysis software is discussed. The software development occurred between 1978 and 1984 in support of solar energy module testing at the Jet Propulsion Laboratory's Parabolic Dish Test Site, located within Edwards Test Station. The development went through incremental stages, starting with a simple single-user BASIC set of programs, and progressing to the relative complex multi-user FORTRAN system that was used until the termination of the project. Additional software in support of testing is discussed including software in support of a meteorological subsystem and the Test Bed Concentrator Control Console interface. Conclusions and recommendations for further development are discussed.

  8. Materials for the field test - students' attitudes to nuclear power stations. Materialien zum Unterrichtsversuch: Kernkraftwerke in der Einstellung von Jugendlichen

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, L; Kattmann, U; Lucht, H; Spada, H [Kiel Univ. (Germany, F.R.). Inst. fuer die Paedagogik der Naturwissenschaften (IPN)

    1975-01-01

    This working paper contains all the materials developed for and used in the field test of 'Student Attitudes toward Atomic Power Stations'. This research is a component of a larger project called 'Attitudes and Attitudes Change with Regard to Problems of Energy Supply and their Consequences for our Environment'. A central aim of this project is the development of instrumental strategies enabling the student to build up in this field a critically reflective and active behavior and attitudes based on sound problem consciousness. These instrumental strategies are derived from theories of social, learning and environmental psychology. A concrete result of these efforts are the materials of the field test mentioned above. They include: a) The draft of an instructional unit 'Atomic Power Stations - Prosperity or Disaster' with - a booklet on the subject matter for students and teachers - a paper on the contents of the instructional unit and their sequence - information for the students concerning the aims of the investigation - working materials for the students - reading materials for the teachers informing them about the proposed instructional strategies based on the psychological theories: (1) model-learning and the structuring of knowledge, (2) how to activate and motivate students, (3) the stabilization of attitudes and (4) small group work. b) Instruments for testing and observation. These instruments were used within a criterion-oriented evaluation and for a test of the effects of the different proposed items used in the instruction.

  9. Solid polymer electrolyte water electrolysis system development. [to generate oxygen for manned space station applications

    Science.gov (United States)

    1975-01-01

    Solid polymer electrolyte technology used in a water electrolysis system (WES) to generate oxygen and hydrogen for manned space station applications was investigated. A four-man rated, low pressure breadboard water electrolysis system with the necessary instrumentation and controls was fabricated and tested. A six man rated, high pressure, high temperature, advanced preprototype WES was developed. This configuration included the design and development of an advanced water electrolysis module, capable of operation at 400 psig and 200 F, and a dynamic phase separator/pump in place of a passive phase separator design. Evaluation of this system demonstrated the goal of safe, unattended automated operation at high pressure and high temperature with an accumulated gas generation time of over 1000 hours.

  10. Development of decommissioning engineering support system (DEXUS) of the Fugen Nuclear Power Station

    International Nuclear Information System (INIS)

    Iguchi, Yukihiro; Kanehira, Yoshiki; Tochibana, Mitsuo

    2004-01-01

    The Fugen Nuclear Power Station (NPS) was shut down permanently in March 2003, and preparatory activities are underway to decommission the Fugen NPS. An engineering system to support the decommissioning is being developed to create a dismantling plan using state-of-art software such as 3-dimensional computer aided design (3D-CAD) and virtual reality (VR). In particular, an exposure dose evaluation system using VR has been developed and tested. The total system can be used to quantify radioactive waste, to visualize radioactive inventory, to simulate the dismantling plan, to evaluate workload in radiation environments and to optimize the decommissioning plan. The system will also be useful for educating and training workers and for gaining public acceptance. (author)

  11. Design and Development of a CPCI-Based Electronics Package for Space Station Experiments

    Science.gov (United States)

    Kolacz, John S.; Clapper, Randy S.; Wade, Raymond P.

    2006-01-01

    The NASA John H. Glenn Research Center is developing a Compact-PCI (CPCI) based electronics package for controlling space experiment hardware on the International Space Station. Goals of this effort include an easily modified, modular design that allows for changes in experiment requirements. Unique aspects of the experiment package include a flexible circuit used for internal interconnections and a separate enclosure (box in a box) for controlling 1 kW of power for experiment fuel heating requirements. This electronics package was developed as part of the FEANICS (Flow Enclosure Accommodating Novel Investigations in Combustion of Solids) mini-facility which is part of the Fluids and Combustion Facility s Combustion Integrated Rack (CIR). The CIR will be the platform for future microgravity combustion experiments and will reside on the Destiny Module of the International Space Station (ISS). The FEANICS mini-facility will be the primary means for conducting solid fuel combustion experiments in the CIR on ISS. The main focus of many of these solid combustion experiments will be to conduct applied scientific investigations in fire-safety to support NASA s future space missions. A description of the electronics package and the results of functional testing are the subjects of this report. The report concludes that the use of innovative packaging methods combined with readily available COTS hardware can provide a modular electronics package which is easily modified for changing experiment requirements.

  12. Simulated earthquake testing of naturally aged C and D LCU-13 station battery cells

    International Nuclear Information System (INIS)

    Tulk, J.D.; Black, D.A.; Janis, W.J.; Royce, C.J.

    1985-03-01

    A sample of 10-year-old lead-acid storage batteries from the North Anna Nuclear Power Station (Virginia Electric and Power Company) were tested on a shaker table. Seven cells were subjected to simulated earthquakes with a ZPA of approximately 1.5 g. All seven delivered uninterrupted power during the shaker tests and were able to pass a post-seismic capacity test. Two cells were shaken to higher intensities (ZPA approximately equal to 2 g). These cells provided uninterrupted power during the shaker tests, but had post-seismic capacities that were below the required level for Class1E battery cells. After the tests, several cells were disassembled and examined. Internal components were in good condition with limited oxidization and plate cracking

  13. Situation and future developments in the power station engineering of the GDR

    International Nuclear Information System (INIS)

    Effenberger, H.; Weidlich, H.G.

    1990-01-01

    Starting with the present state of power stations in the GDR and their evaluation in respect of energy and ecology, the authors have developed a concept for the future objectives and possibilities of the power stations. With regard to the modification of the power station engineering, considered as urgently required due to reasons of energy and environment, there was suggestions for modern plant conceptions, such as fluidized bed combustors, combined and gas/steam power plants, besides the retrofitting and the new building of proven conventional plants. It includes also the extension of combined heat and power systems, of nuclear energy, and the use of regenerative energy sources as parts of this concept. The power station modifications intended are shown in tables for the various power station locations. (orig.) [de

  14. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  15. International Space Station USOS Waste and Hygiene Compartment Development

    Science.gov (United States)

    Link, Dwight E., Jr.; Broyan, James Lee, Jr.; Gelmis, Karen; Philistine, Cynthia; Balistreri, Steven

    2007-01-01

    The International Space Station (ISS) currently provides human waste collection and hygiene facilities in the Russian Segment Service Module (SM) which supports a three person crew. Additional hardware is planned for the United States Operational Segment (USOS) to support expansion of the crew to six person capability. The additional hardware will be integrated in an ISS standard equipment rack structure that was planned to be installed in the Node 3 element; however, the ISS Program Office recently directed implementation of the rack, or Waste and Hygiene Compartment (WHC), into the U.S. Laboratory element to provide early operational capability. In this configuration, preserved urine from the WHC waste collection system can be processed by the Urine Processor Assembly (UPA) in either the U.S. Lab or Node 3 to recover water for crew consumption or oxygen production. The human waste collection hardware is derived from the Service Module system and is provided by RSC-Energia. This paper describes the concepts, design, and integration of the WHC waste collection hardware into the USOS including integration with U.S. Lab and Node 3 systems.

  16. Perl Testing A Developer's Notebook

    CERN Document Server

    Langworth, Ian

    2005-01-01

    Is there any sexier topic in software development than software testing? That is, besides game programming, 3D graphics, audio, high-performance clustering, cool websites, et cetera? Okay, so software testing is low on the list. And that's unfortunate, because good software testing can increase your productivity, improve your designs, raise your quality, ease your maintenance burdens, and help to satisfy your customers, coworkers, and managers. Perl has a strong history of automated tests. A very early release of Perl 1.0 included a comprehensive test suite, and it's only improved from th

  17. Start-up tests of Kashiwazakikariwa Nuclear Power Station Unit No.2 and No.5

    International Nuclear Information System (INIS)

    Fueki, Kensuke; Aoki, Shiro; Tanaka, Yasuhisa; Yahagi, Kimitoshi

    1991-01-01

    The Kashiwazakikariwa Nuclear Power Station Units No.5 and No.2 started commercial operation on April 10 and September 28 of 1990 respectively. As the result of the application of the First and Second LWR Improvement and Standardization Program, the plants were designed aiming at improvement of reliability, operation, and maintenance while maintaining safety. Construction of the plants took 6.5 to 7 years for completion, during which period the last 10 months were spent for the start up tests program. Start up tests were carried out under deliberate management to assure that the plants can operate safely and steadily at the prescribed operating points, and the schedules and tests item modifications adopted in Unit No.2 and No.5 were verified under the start up tests program. (author)

  18. Forced vibration tests on the reactor building of a nuclear power station, 1

    International Nuclear Information System (INIS)

    Takeda, Toshikazu; Tsunoda, Tomohiko; Wakamatsu, Kunio; Kaneko, Masataka; Nakamura, Mitsuru; Kunoh, Toshio; Murahashi, Hisahiro

    1988-01-01

    Tsuruga Unit No.2 Nuclear Power Station of the Japan Atomic Power Company is the first PWR-type 4-loop plant constructed in Japan with a prestressed concrete containment vessel (PCCV). This report describes forced vibration tests carried out on the reactor building of this plant. The following were obtained as results: (1) The results of the forced vibration tests corresponded well on the whole with design values. (2) The vibration characteristics of the PCCV observed in the tests after prestressing are no different from the ones before prestressing. This shows that the vibration properties of the PCCV are practically independent of prestressing loads. (3) A seismic response analysis of the design basis earthquake was made on the design model reflecting the test results. The seismic safety of the plant was confirmed by this analysis. (author)

  19. Test and evaluation of load converter topologies used in the Space Station Freedom power management and distribution dc test bed

    Science.gov (United States)

    Lebron, Ramon C.; Oliver, Angela C.; Bodi, Robert F.

    1991-01-01

    Power components hardware in support of the Space Station freedom dc Electric Power System were tested. One type of breadboard hardware tested is the dc Load Converter Unit, which constitutes the power interface between the electric power system and the actual load. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. Three load converters were tested: a series resonant converter, a series inductor switch-mode converter, and a switching full-bridge forward converter. The topology, operation principles, and test results are described, in general. A comparative analysis of the three units is given with respect to efficiency, regulation, short circuit behavior (protection), and transient characteristics.

  20. Free-Suspension Residual Flexibility Testing of Space Station Pathfinder: Comparison to Fixed-Base Results

    Science.gov (United States)

    Tinker, Michael L.

    1998-01-01

    Application of the free-suspension residual flexibility modal test method to the International Space Station Pathfinder structure is described. The Pathfinder, a large structure of the general size and weight of Space Station module elements, was also tested in a large fixed-base fixture to simulate Shuttle Orbiter payload constraints. After correlation of the Pathfinder finite element model to residual flexibility test data, the model was coupled to a fixture model, and constrained modes and frequencies were compared to fixed-base test. modes. The residual flexibility model compared very favorably to results of the fixed-base test. This is the first known direct comparison of free-suspension residual flexibility and fixed-base test results for a large structure. The model correlation approach used by the author for residual flexibility data is presented. Frequency response functions (FRF) for the regions of the structure that interface with the environment (a test fixture or another structure) are shown to be the primary tools for model correlation that distinguish or characterize the residual flexibility approach. A number of critical issues related to use of the structure interface FRF for correlating the model are then identified and discussed, including (1) the requirement of prominent stiffness lines, (2) overcoming problems with measurement noise which makes the antiresonances or minima in the functions difficult to identify, and (3) the use of interface stiffness and lumped mass perturbations to bring the analytical responses into agreement with test data. It is shown that good comparison of analytical-to-experimental FRF is the key to obtaining good agreement of the residual flexibility values.

  1. Development of low cost wireless radiation monitoring station using GSM network

    International Nuclear Information System (INIS)

    Nur Aira Abd Rahman; Mohd Ashhar Khalid; Nor Arymaswati Abdullah; Roslan Md Dan

    2006-01-01

    SMS or Short Message Service is a mean of GSM wireless communication that allow text messages to be sent to and from mobile cell phones. While SMS communication is mainly utilized at personal level or person to person basis; the usage of SMS can be extended into nuclear application specifically in radiation monitoring. This paper explains the development of a wireless station assembled by using a recycled Siemens M50 cell phone as substitutes to GSM modem, a PIC micro controller, and MINT-ISG home made digital survey meter at the remote transmitting site. While at the receiving end; an online monitoring system is set-up by using a Bluetooth enabled cell phone, a Bluetooth dongle, and a PC with Labview 8.0 software written as the Data logger which also served as the PC-Bluetooth interface platform. Wireless station at the remote area operates by continuously sending SMS in every 3 minutes to a predefined cellular number located at the monitoring system. The SMS consists of 6 data which individually is a survey meter readings recorded at each 30 seconds duration. At the receiver, Data logger program will retrieve the SMS from the cell phone via Bluetooth and extract the original 6 readings to be displayed on PC. The system has been successfully tested to detect and log radiation data for extended period of time. (Author)

  2. Developing test materials for dyscalculia

    DEFF Research Database (Denmark)

    Lindenskov, Lena; Bent, Lindhardt,

    Aims, requirements and context for the development of test materials for dyscalculia are analyzed. The test materials are to be used for Grade 4 pupils in Danish primary schools. Preliminary results are presented from focus group interview with adolescents and adults, who see themselves as being...

  3. Development and Characterization of Tissue Equivalent Proportional Counter for Radiation Monitoring in International Space Station

    Directory of Open Access Journals (Sweden)

    Uk-Won Nam

    2013-06-01

    Full Text Available Tissue equivalent proportional counter (TEPC can measure the Linear Energy Transfer (LET spectrum and calculate the equivalent dose for the complicated radiation field in space. In this paper, we developed and characterized a TEPC for radiation monitoring in International Space Station (ISS. The prototype TEPC which can simulate a 2 μm of the site diameter for micro-dosimetry has been tested with a standard alpha source (241Am, 5.5 MeV. Also, the calibration of the TEPC was performed by the 252Cf neutron standard source in Korea Research Institute of Standards and Science (KRISS. The determined calibration factor was kf = 3.59×10-7 mSv/R.

  4. Free-free and fixed base modal survey tests of the Space Station Common Module Prototype

    Science.gov (United States)

    Driskill, T. C.; Anderson, J. B.; Coleman, A. D.

    1992-01-01

    This paper describes the testing aspects and the problems encountered during the free-free and fixed base modal surveys completed on the original Space Station Common Module Prototype (CMP). The CMP is a 40-ft long by 14.5-ft diameter 'waffle-grid' cylinder built by the Boeing Company and housed at the Marshall Space Flight Center (MSFC) near Huntsville, AL. The CMP modal survey tests were conducted at MSFC by the Dynamics Test Branch. The free-free modal survey tests (June '90 to Sept. '90) included interface verification tests (IFVT), often referred to as impedance measurements, mass-additive testing and linearity studies. The fixed base modal survey tests (Feb. '91 to April '91), including linearity studies, were conducted in a fixture designed to constrain the CMP in 7 total degrees-of-freedom at five trunnion interfaces (two primary, two secondary, and the keel). The fixture also incorporated an airbag off-load system designed to alleviate the non-linear effects of friction in the primary and secondary trunnion interfaces. Numerous test configurations were performed with the objective of providing a modal data base for evaluating the various testing methodologies to verify dynamic finite element models used for input to coupled load analysis.

  5. International Space Station Bacteria Filter Element Post-Flight Testing and Service Life Prediction

    Science.gov (United States)

    Perry, J. L.; von Jouanne, R. G.; Turner, E. H.

    2003-01-01

    The International Space Station uses high efficiency particulate air (HEPA) filters to remove particulate matter from the cabin atmosphere. Known as Bacteria Filter Elements (BFEs), there are 13 elements deployed on board the ISS's U.S. Segment. The pre-flight service life prediction of 1 year for the BFEs is based upon performance engineering analysis of data collected during developmental testing that used a synthetic dust challenge. While this challenge is considered reasonable and conservative from a design perspective, an understanding of the actual filter loading is required to best manage the critical ISS Program resources. Thus testing was conducted on BFEs returned from the ISS to refine the service life prediction. Results from this testing and implications to ISS resource management are discussed. Recommendations for realizing significant savings to the ISS Program are presented.

  6. Development of a HTS transceiver sub-system for 3G mobile communication TD-SCDMA base station

    Science.gov (United States)

    Zhang, Xueqiang; He, Xiaofeng; Wang, Yuehui; Duan, Tao; Wang, Guizhen; Zhang, Yan; Li, Chunguang; Zhang, Qiang; Li, Hong; He, Yusheng

    2010-02-01

    A prototype of a high temperature superconducting (HTS) transceiver sub-system for applications in a TD-SCDMA, one of the third generation (3G) communication standards, base station has been developed. Both the HTS sub-system and the conventional counterpart have been implemented into a TD-SCDMA commercial communication network and comparison test studies were carried out. The measured results showed that the HTS sub-system could remarkably improve the RF performance of both transmitting and receiving chains.

  7. Development of a HTS transceiver sub-system for 3G mobile communication TD-SCDMA base station

    Energy Technology Data Exchange (ETDEWEB)

    Zhang Xueqiang; He Xiaofeng; Wang Yuehui; Li Chunguang; Zhang Qiang; Li Hong; He Yusheng [National Laboratory for Superconductivity, Institute of Physics, Chinese Academy of Sciences, Beijing 100190 (China); Duan Tao; Wang Guizhen; Zhang Yan [Datang Mobile Communications Equipment Co., Ltd, Beijing 100190 (China)

    2010-02-15

    A prototype of a high temperature superconducting (HTS) transceiver sub-system for applications in a TD-SCDMA, one of the third generation (3G) communication standards, base station has been developed. Both the HTS sub-system and the conventional counterpart have been implemented into a TD-SCDMA commercial communication network and comparison test studies were carried out. The measured results showed that the HTS sub-system could remarkably improve the RF performance of both transmitting and receiving chains.

  8. Development of a HTS transceiver sub-system for 3G mobile communication TD-SCDMA base station

    International Nuclear Information System (INIS)

    Zhang Xueqiang; He Xiaofeng; Wang Yuehui; Li Chunguang; Zhang Qiang; Li Hong; He Yusheng; Duan Tao; Wang Guizhen; Zhang Yan

    2010-01-01

    A prototype of a high temperature superconducting (HTS) transceiver sub-system for applications in a TD-SCDMA, one of the third generation (3G) communication standards, base station has been developed. Both the HTS sub-system and the conventional counterpart have been implemented into a TD-SCDMA commercial communication network and comparison test studies were carried out. The measured results showed that the HTS sub-system could remarkably improve the RF performance of both transmitting and receiving chains.

  9. Development of the Next Generation Gas Trap for the Space Station Internal Thermal Control System

    Science.gov (United States)

    Leimkuehler, Thomas O.; Spelbring, Chris; Reeves, Daniel R.; Holt, James M.

    2003-01-01

    The current dual-membrane gas trap is designed to remove non-condensed gases (NCG) from the Internal Thermal Control System (ITCS) coolant on board the International Space Station (ISS). To date it has successfully served its purpose of preventing depriming, overspeed, and shutdown of the ITCS pump. However, contamination in the ITCS coolant has adversely affected the gas venting rate and lifetime of the gas trap, warranting a development effort for a next-generation gas trap. Design goals are to meet or exceed the current requirements to (1) include greater operating ranges and conditions, (2) eliminate reliance on the current hydrophilic tube fabrication process, and (3) increase operational life and tolerance to particulate and microbial growth fouling. In addition, the next generation gas trap will essentially be a 'dropin" design such that no modifications to the ITCS pump package assembly (PPA) will be required, and the implementation of the new design will not affect changes to the ITCS operational conditions, interfaces, or software. This paper will present the initial membrane module design and development work which has included (1) a trade study among several conceptual designs, (2) performance modeling of a hydrophobic-only design, and (3) small-scale development test data for the hydrophobic-only design. Testing has shown that the hydrophobic-only design is capable of performing even better than the current dual-membrane design for both steady-state gas removal and gas slug removal.

  10. Latest development of safeguard pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Schill, J.; Fekadu, J.

    1979-01-01

    Performance testing of Residual Heat Removal (RHR) pumps and High Pressure Safety Injection (HPSI) pumps is described. RHR pump is characterised by a combination of an impeller, diffuser and has an annular pressure retaining casted casing. This casing enables a 100% radiographic examination and its geometrical pattern facilitates the use of an axi-symmetric shell model for the computer analysis. Similar considerations govern the choice of the pressure casing of the HPSI pumps. These pumps are meant for nuclear facilities and have to meet certain limiting factors which are mentioned. (M.G.B.)

  11. Influence of the cost development in power station construction and operation on power station planning with special regard to the effects on electricity supply

    International Nuclear Information System (INIS)

    Krieb, K.H.; Frenzel, P.; Vogel, J.

    1974-01-01

    A survey on the present structure of thermal power facilities in the FRG is followed by a discussion of the development of power plant costs in the last few years. Also mentioned are the findings of studies of costs as a function of the power station size and the effects of the overall cost increase on the power generation costs of the last few years. Finally, a model conception for the development of power stations is presented which makes predictions about the future size of power stations and their constructional parts. (UA/AK) [de

  12. DWPF liquid sample station: Status of equipment development

    International Nuclear Information System (INIS)

    Caplan, J.R.

    1987-01-01

    This report summarizes operating experience and equipment status of the DWPF liquid sample cell. Operation hours to date, results of equipment inspections and problems encountered and their solutions are discussed. An equipment and instrumentation status updating DPST-85-592, DWPF LIQUID SAMPLE CELL MOCK-UP, is presented. Remaining development items are also outlined

  13. Development of a compact nuclear power station engineering simulator

    International Nuclear Information System (INIS)

    Jian Jianfeng; Yang Yanhua; Lin Meng; Hu Rui

    2003-01-01

    The compact nuclear power plant project simulator is developed based on the Chashma nuclear power plant. This simulator consists of simulation computation code, data communication module and human-machine interface. This paper discusses the design and implementation of the simulator from such aspect as computer system, hydrothermal model, programming language, human-machine interface and data communication in details

  14. Test Station for Magnetization Measurements on Large Quantities of Superconducting Strands

    CERN Document Server

    Le Naour, S; Billan, J; Genest, J

    2001-01-01

    In the superconducting main magnets of the Large Hadron Collider (LHC), persistent currents in the superconductor determine the field quality at injection field. For this reason it is necessary to check the magnetization of the cable strands during their production. During four years, this requires measurements of the width of the strand magnetization hysteresis loop at 0.5 T, 1.9 K, at a rate of up to eight samples per day. This paper describes the design, construction and the first results of a magnetization test station built for this purpose. The samples are cooled in a cryostat, with a 2-m long elliptic tail. This tail is inserted in a normal conducting dipole magnet with a field between ± 1.5 T. Racetrack pick-up coils, integrated in the cryostat, detect the voltage due to flux change, which is then integrated numerically. The sample holder can contain eight strand samples, each 20 cm long. The test station operates in two modes: either the sample is fixed while the external field is changed, or the sa...

  15. PWR station blackout transient simulation in the INER integral system test facility

    International Nuclear Information System (INIS)

    Liu, T.J.; Lee, C.H.; Hong, W.T.; Chang, Y.H.

    2004-01-01

    Station blackout transient (or TMLB' scenario) in a pressurized water reactor (PWR) was simulated using the INER Integral System Test Facility (IIST) which is a 1/400 volumetrically-scaled reduce-height and reduce-pressure (RHRP) simulator of a Westinghouse three-loop PWR. Long-term thermal-hydraulic responses including the secondary boil-off and the subsequent primary saturation, pressurization and core uncovery were simulated based on the assumptions of no offsite and onsite power, feedwater and operator actions. The results indicate that two-phase discharge is the major depletion mode since it covers 81.3% of the total amount of the coolant inventory loss. The primary coolant inventory has experienced significant re-distribution during a station blackout transient. The decided parameter to avoid the core overheating is not the total amount of the coolant inventory remained in the primary core cooling system but only the part of coolant left in the pressure vessel. The sequence of significant events during transient for the IIST were also compared with those of the ROSA-IV large-scale test facility (LSTF), which is a 1/48 volumetrically-scaled full-height and full-pressure (FHFP) simulator of a PWR. The comparison indicates that the sequence and timing of these events during TMLB' transient studied in the RHRP IIST facility are generally consistent with those of the FHFP LSTF. (author)

  16. Controlled environmental radioiodine tests at the national reactor testing station. 1965 progress report

    Energy Technology Data Exchange (ETDEWEB)

    Adams, D.R.; Bunch, D.F.; Gammill, W.P.; Hawley, C.A. Jr.; Markee, E.H.; Tiernan, M.W.

    1966-02-01

    The CERT project consists of a series of planned releases of radioiodine over different vegetation and during various meteorological conditions, with the prime objective being to measure the relationships involved in the passage of radioiodine through the air-vegetation-cow-milk-human chain. The results of the first five tests in the series, which started in the spring of 1963 and is continuing, are reported. Each test was conducted under measured meteorological conditions and over prepared sampling and grazing courses. Two tests were made over open-range type vegetation, two over irrigated pastures, and one over snow-covered ground. Two tests were conducted under lapse conditions, two under inversion conditions, and one under neutral conditions. In each case, known quantities of elemental /sup 131/I/sub 2/ were released. Relationships determined included air-grass ratios (deposition velocities) which ranged from 0.1 to 1.0 cm/sec; effective half life of /sup 131/I on grass of 3.5 days and 5.5 days; the time of peak activity in milk at two days following a release; milk-grass ratio (C/1:C/g); total /sup 131/I secreted in milk by cows to that ingested by cows; adult human thyroid uptake fraction (inhalation); and based on a breathing rate of 20 m/sup 3//24 hours, the ratio between infinity mills ingestion dose and infinity inhalation dose for a single release was calculated. Data, descriptions of methods, and calculations are reported. Discussions of resuspension factors and particle sizes and behavior are also included.

  17. Development of the fuel-cycle costs in nuclear power stations with light-water reactors

    International Nuclear Information System (INIS)

    Brosch, R.; Moraw, G.; Musil, G.; Schneeberger, M.

    1976-01-01

    The authors investigate the fuel-cycle costs in nuclear power stations with light-water reactors in the Federal Republic of Germany in the years 1966 to 1976. They determine the effect of the price development for the individual components of the nuclear fuel cycle on the fuel-cycle costs averaged over the whole power station life. Here account is taken also of inflation rates and the change in the DM/US $ parity. In addition they give the percentage apportionment of the fuel-cycle costs. The authors show that real fuel-cycle costs for nuclear power stations with light-water reactors in the Federal Republic of Germany have risen by 11% between 1966 and 1976. This contradicts the often repeated reproach that fuel costs in nuclear power stations are rising very steeply and are no longer competitive. (orig.) [de

  18. Testing various modes of installation for permanent broadband stations in open field environment

    Science.gov (United States)

    Vergne, Jérôme; Charade, Olivier; Arnold, Benoît; Louis-Xavier, Thierry

    2014-05-01

    In the framework of the RESIF (Réseau Sismologique et géodésique Français) project, we plan to install more than one hundred new permanent broadband stations in metropolitan France within the next 6 years. Whenever possible, the sensors will be installed in natural or artificial underground cavities that provide a stable thermal environment. However such places do not exist everywhere and we expect that about half the future stations will have to be set up in open fields. For such sites, we are thus looking for a standard model of hosting infrastructure for the sensors that would be easily replicated and would provide good noise level performances at long periods. Since early 2013, we have been operating a prototype station at Clévilliers, a small location in the sedimentary Beauce plain, where we test three kinds of buried seismic vaults and a down-hole installation. The cylindrical seismic vaults are 3m deep and 1m wide and only differ by the type of coupling between the casing and the concrete slab where we installed insulated Trillium T120PA seismometers. The down-hole installation consists in a 3m deep well hosting a Trillium Posthole seismometer. For reference, another sensor has been installed in a ~50cm deep hole, similarly to the way we test every new potential site. Here we compare the noise level in each infrastructure at different frequencies. We observe quite similar performances for the vertical component recorded in the different wells. Conversely, the noise levels on the horizontal components at periods greater than 10s vary by more than 20dB depending on the installation condition. The best results are obtained in the completely decoupled vault and for the down-hole setting, both showing performances comparable to some of our permanent stations installed in tunnels. The amplitude of the horizontal noise also appears to be highly correlated to wind speed recorded on site, even at long periods. The variable response of each vault to such

  19. Laboratory development and testing of spacecraft diagnostics

    Science.gov (United States)

    Amatucci, William; Tejero, Erik; Blackwell, Dave; Walker, Dave; Gatling, George; Enloe, Lon; Gillman, Eric

    2017-10-01

    The Naval Research Laboratory's Space Chamber experiment is a large-scale laboratory device dedicated to the creation of large-volume plasmas with parameters scaled to realistic space plasmas. Such devices make valuable contributions to the investigation of space plasma phenomena under controlled, reproducible conditions, allowing for the validation of theoretical models being applied to space data. However, in addition to investigations such as plasma wave and instability studies, such devices can also make valuable contributions to the development and testing of space plasma diagnostics. One example is the plasma impedance probe developed at NRL. Originally developed as a laboratory diagnostic, the sensor has now been flown on a sounding rocket, is included on a CubeSat experiment, and will be included on the DoD Space Test Program's STP-H6 experiment on the International Space Station. In this talk, we will describe how the laboratory simulation of space plasmas made this development path possible. Work sponsored by the US Naval Research Laboratory Base Program.

  20. ASME XI stroke time testing of solenoid valves at Connecticut Yankee Station

    Energy Technology Data Exchange (ETDEWEB)

    Martin, C.W.

    1996-12-01

    Connecticut Yankee Atomic Power Company has developed the capability of measuring the stroke times of AC and DC solenoid valves. This allows the station to measure the stroke time of any solenoid valve in the plant, even those valves which do not have valve stem position indicators. Connecticut Yankee has adapted the ITI MOVATS Checkmate 3 system, using a signal input from a Bruel and Kjaer (B&K) Model 4382 acoustic accelerometer and the Schaumberg Campbell Associates (SCA) Model SCA-1148 dual sensor, which is a combined accelerometer and gaussmeter.

  1. ASME XI stroke time testing of solenoid valves at Connecticut Yankee Station

    International Nuclear Information System (INIS)

    Martin, C.W.

    1996-01-01

    Connecticut Yankee Atomic Power Company has developed the capability of measuring the stroke times of AC and DC solenoid valves. This allows the station to measure the stroke time of any solenoid valve in the plant, even those valves which do not have valve stem position indicators. Connecticut Yankee has adapted the ITI MOVATS Checkmate 3 system, using a signal input from a Bruel and Kjaer (B ampersand K) Model 4382 acoustic accelerometer and the Schaumberg Campbell Associates (SCA) Model SCA-1148 dual sensor, which is a combined accelerometer and gaussmeter

  2. Integrated water management system - Description and test results. [for Space Station waste water processing

    Science.gov (United States)

    Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.

    1983-01-01

    Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

  3. Mobile work station concept for assembly of large space structures (zero gravity simulation tests)

    Science.gov (United States)

    Heard, W. L., Jr.; Bush, H. G.; Wallsom, R. E.; Jensen, J. K.

    1982-03-01

    The concept presented is intended to enhance astronaut assembly of truss structure that is either too large or complex to fold for efficient Shuttle delivery to orbit. The potential of augmented astronaut assembly is illustrated by applying the result of the tests to a barebones assembly of a truss structure. If this structure were assembled from the same nestable struts that were used in the Mobile Work Station assembly tests, the spacecraft would be 55 meters in diameter and consist of about 500 struts. The struts could be packaged in less than 1/2% of the Shuttle cargo bay volume and would take up approximately 3% of the mass lift capability. They could be assembled in approximately four hours. This assembly concept for erectable structures is not only feasible, but could be used to significant economic advantage by permitting the superior packaging feature of erectable structures to be exploited and thereby reduce expensive Shuttle delivery flights.

  4. Test Driven Development: Performing Art

    Science.gov (United States)

    Bache, Emily

    The art of Test Driven Development (TDD) is a skill that needs to be learnt, and which needs time and practice to master. In this workshop a select number of conference participants with considerable skill and experience are invited to perform code katas [1]. The aim is for them to demonstrate excellence and the use of Test Driven Development, and result in some high quality code. This would be for the benefit of the many programmers attending the conference, who could come along and witness high quality code being written using TDD, and get a chance to ask questions and provide feedback.

  5. Test and Evaluation Station (TESt) - A Control System for the ALICE-HMPID Liquid Distribution Prototype

    CERN Document Server

    Maatta, E; CERN. Geneva; Swoboda, Detlef; Lecoeur, G

    1999-01-01

    The sub-detectors and systems in the ALICE experiment [1] are of various types. However, during physics runs, all devices necessary for the operation of the detector must be accessible and controllable through a common computer interface. Throughout all other periods each sub-detector requires maintenance, upgrading or test operation. To this end, an access independant of other sub-detectors must be guaranteed. These basic requirements impose a fair number of constraints on the architecture and components of the Detector Control System (DCS). The purpose of the TESt project consisted in the construction of a stand alone unit for a specific sub-system of an ALICE detector in order to gain first experience with commercial products for detector control. Although the control system includes only a small number of devices and is designed for a particular application, it covers nevertheless all layers of a complete system and can be extended or used in different applications. The control system prototype has been...

  6. Cask development, testing, and licensing

    International Nuclear Information System (INIS)

    Quinn, G.J.; Haelsig, R.T.; Warrant, M.M.

    1986-01-01

    The NuPac 125-B Rail Cask was developed to provide a safe means of transporting the damaged core of Three Mile Island Unit 2 from the TMI site at Middletown, PA, to the Idaho National Engineering laboratory (INEL) at Idaho Falls, ID. The development of the NuPac 125-B Rail Cask posed two engineering and technical management challenges; Licensing Strategy - The NuPac 125-B Rail Cask represented the first irradiated fuel rail cask developed within the United States in the past decade, a decade characterized by changing nuclear regulations, and Accelerated Schedule - The TMI-2 defueling schedule demanded a cask development schedule one-third as long as normally required. These challenges governed the overall development and licensing process for the cask. First, a high degree of conservation was incorporated into the design to allow quick, simplified demonstrations of adequacy to regulatory staff. Second, redundant design techniques were employed in all areas of uncertainty. The testing program eliminated performance uncertainties and validated predictions and predictive models. Drop tests of a quarter-scale model of the cask were conducted, and results were correlated with analytic predictions to verify structural and mechanical performance of the cask. Full-scale tests of the canisters were conducted to verify structural behavior of canister internals which provide criticality control. This paper describes the testing program for the NuPac 125-B Rail Cask, presents results therefrom, and correlates findings with Regulation 10 CFR 71 of the U.S. Nuclear Regulatory Commission

  7. Boiler recirculation pumps for nuclear power stations - present state of development. Directions for planning, operational experience

    International Nuclear Information System (INIS)

    Mattias, H.B.

    1976-01-01

    Boiler recirculation pumps are important components of modern power stations. The development of large recirculation pumps up to a driving power of 1,500 kW was faced with some problems in meeting the plant requirements. In this paper, the present state of development is dealt with. The development problems in the fields of hydrodynamics, cavitation, corrosion and erosion are dealt with as well as the problems of the design of the casing with regard to thermodynamics and strength. Finally, operational experience with the boiler recirculation pump for 600 MW power stations will be reported on. (orig./AK) [de

  8. Definition of technology development missions for early space station satellite servicing, volume 2

    Science.gov (United States)

    1983-01-01

    The results of all aspects of the early space station satellite servicing study tasks are presented. These results include identification of servicing tasks (and locations), identification of servicing mission system and detailed objectives, functional/operational requirements analyses of multiple servicing scenarios, assessment of critical servicing technology capabilities and development of an evolutionary capability plan, design and validation of selected servicing technology development missions (TDMs), identification of space station satellite servicing accommodation needs, and the cost and schedule implications of acquiring both required technology capability development and conducting the selected TDMs.

  9. Definition of technology development missions for early Space Station satellite servicing. Volume 2: Technical

    Science.gov (United States)

    Cable, D. A.; Diewald, C. A.; Hills, T. C.; Parmentier, T. J.; Spencer, R. A.; Stone, G. E.

    1984-01-01

    Volume 2 contains the Technical Report of the approach and results of the Phase 2 study. The phase 2 servicing study was initiated in June 1983, and is being reported in this document. The scope of the contract was to: (1) define in detail five selected technology development missions (TDM); (2) conduct a design requirement analysis to refine definitions of satellite servicing requirements at the space station; and (3) develop a technology plan that would identify and schedule prerequisite precursor technology development, associated. STS flight experiments and space station experiments needed to provide onorbit validation of the evolving technology.

  10. Development of expert evaluation system for advanced nuclear power stations

    International Nuclear Information System (INIS)

    Yang Mengjia; Ren Junsheng; Zhou Zhiwei; Zhang Qi; Zhu Shutang

    2005-01-01

    The wheels of the nuclear power industry in China are going to roll on the fast rails soon: It is important to establish an expert evaluation system for optimally selecting new types of NPPs in the future based on scientific evaluation. Under such a background, an expert evaluation system is developed to evaluate Various types of NPPs for the following two decades by taking into account the advices of selected top specialists in Chinese nuclear power industry, and by adopting different evaluation methods. The evaluation system is designed to use the database-MS-SQL Server or Oracle for manipulating experts' knowledge and objective data for scaling NPPs by user-selected evaluation methods for evaluating NPPs. The system includes two subsystems: one is called the Data Management Module and the other called the Evaluation Arithmetic Module. The Data Management Module is used to manage expert knowledge in forms of item marks of the NPPs given by experts of nuclear engineering. The Evaluation Arithmetic Module is used to analyze and deal with the evaluation based on the data in the Database by certain designed evaluation method, and to provide the evaluation results. Based on the users' selection, the evaluation of the NPPs is processed, and the results can be dynamically listed in table or displayed in graphics. So it can be used as a consulting tool to help users make optimal selection of prospective NPPs. The system is developed in architecture of the mixture framework C/S(Client/Server) and B/S(Browse/Server), thus is safe, advanced, extensible and user- friendly. The present system is computer network based, so it can be used not only in personal PC and local network, but also in the Web Server which can be browsed by remote users. To develop such an evaluation system is an initiative R and D project in Chinese nuclear R and D activities. Although the evaluation system is far from perfect, however, the preliminary evaluation results produced by the evaluation

  11. Development of techniques for radwaste systems in CANDU power stations

    International Nuclear Information System (INIS)

    Bourns, W.T.; Buckley, L.P.; Burrill, K.A.

    1979-04-01

    Techniques to reduce the volume of CANDU reactor wastes and to bitumenize them are being developed at Chalk River Nuclear Laboratories. Reverse osmosis is suitable for initial purification of dilute radioactive aqueous wastes. Tubular membranes are used to concentrate wastes to 5 weight percent solids, and while the membranes do foul, they may be cleaned mechanically, chemically, or with fresh feed. A wiped-film evaporator then concentrates the retentate to a 20 weight-percent slurry. A twin-screw extruder-evaporator has been used to bitumenize this slurry, and it will also handle ion exchange resin and dry incinerator ash. Work on a wiped-film evaporator as a bitumenizer for various feeds is in progress. More experience in handling solid feeds is needed before work can proceed to the demonstraton phase. (auth)

  12. Accelerated leach test development program

    International Nuclear Information System (INIS)

    Fuhrmann, M.; Pietrzak, R.F.; Heiser, J.; Franz, E.M.; Colombo, P.

    1990-11-01

    In FY 1989, a draft accelerated leach test for solidified waste was written. Combined test conditions that accelerate leaching were validated through experimental and modeling efforts. A computer program was developed that calculates test results and models leaching mechanisms. This program allows the user to determine if diffusion controls leaching and, if this is the case, to make projections of releases. Leaching mechanisms other than diffusion (diffusion plus source term partitioning and solubility limited leaching) are included in the program is indicators of other processes that may control leaching. Leach test data are presented and modeling results are discussed for laboratory scale waste forms composed of portland cement containing sodium sulfate salt, portland cement containing incinerator ash, and vinyl ester-styrene containing sodium sulfate. 16 refs., 38 figs., 5 tabs

  13. Technology development for laser-cooled clocks on the International Space Station

    Science.gov (United States)

    Klipstein, W. M.

    2003-01-01

    The PARCS experiment will use a laser-cooled cesium atomic clock operating in the microgravity environment aboard the International Space Station to provide both advanced tests of gravitational theory to demonstrate a new cold-atom clock technology for space.

  14. Control room inleakage testing using tracer gases at Zion Generating station

    International Nuclear Information System (INIS)

    Lagus, P.L.; Brown, J.H.; Dubois, L.J.; Fleming, K.M.

    1993-01-01

    In order to assess the amount of air inleakage into the Control Room Envelope at Zion Generating Station (ZGS), a series of tracer gas tests using sulfur hexafluoride (SF 6 ) were performed on the Control Room ventilation system (PV system) and the Computer Room/Miscellaneous Area ventilation system (OV system) during February, 1991. Two redundant trains, denoted A and B comprise the PV system. Inleakage was measured for each train. An OV supply duct passes through the Control Room Envelope. Leakage from this duct into the Control Room would constitute air leakage into the Control room Envelope and hence any potential leakage had to be quantified. Each test attempted to measure the contribution (if any) of a particular section of PV return duct or OV supply duct to the total air inleakage into the Control Room. This paper reviews the tracer gas tests. Described here are the control room inleakage testing, HVAC equipment room duct inleakage, purge plenum inleakage, OV duct leakage into the control room envelope, vestibule PV return inleakage, TSC duct inleakage, and cable spreading room inleakage. Conclusions from the testing are presented. 5 refs., 4 figs., 7 tabs

  15. Boars for breeding: A study of methods of evaluation used at testing stations

    Directory of Open Access Journals (Sweden)

    Elsi Ettala

    1973-01-01

    Full Text Available The phenotype testing of highly selected boars was studied. Two groups, each of 30 boars, were tested centrally at stations for growth rate and ultrasonically measured fat thickness. According to test points, made up of a combination of these two traits, the 5 best boars, 5 average boars and the 5 poorest boars where selected for progeny evaluation. In all 26 boars and 441 progeny were tested. The progeny evaluation showed that ultrasonic measurement of the fat thickness of the boars gave a very reliable estimate of the meatiness of their progeny. Those boars, as a group, giving the poorest carcass quality could be distinguished with statistical reliability from the other groups. The correlations between sires and progeny were significant for both daily gain (period 20—88 kg and feed efficiency. The importance of rate of growth and feed efficiency has been neglected in selection for breeding as the test points used for the selection of boars depended almost entirely on fat thickness. More than 30 % of both boars and progeny boars suffered from some form of difficulty in walking. 13 % of the boars were eliminated because of leg faults. Leg faults in progeny were mainly inherited or caused through injury. A phenotype evaluation of progeny boars accounts much more effectively for the variation in their carcass value than does a full barrow sib evaluation alone. For best results, a progeny boar phenotype evaluation should be combined with a full barrow sib evaluation.

  16. Test study on safety features of station blackout accident for nuclear main pump

    International Nuclear Information System (INIS)

    Liu Xiajie; Wang Dezhong; Zhang Jige; Liu Junsheng; Yang Zhe

    2009-01-01

    The theoretical and experimental studies of reactor coolant pump accidents encountered nation-wide and world-wide were described. To investigate the transient hydrodynamic performance of reactor coolant pump (RCP) during the period of rotational inertia in the station blackout accident, some theoretical and experimental studies were carried out, and the analysis of the test results was presented. The experiment parameters, conditions and test methods were introduced. The flow-rate, rotate speed and vibrations were analyzed emphatically. The quadruplicate polynomial curve equation was used to simulate the flow-rate,rotate speed along with time. The test results indicate that the flow-rate and rotator speed decrease rapidly at the very beginning of cut power and the test results accord with the regulation of safety standard. The vibrant displacement of bearing seat is intensified at the moment of lose power, but after a certain period rotor shaft libration changes. The test and analysis results help to understand the hydrodynamic performance of nuclear primary pump under lost of power accident, and provide the basic reference for safety evaluation. (authors)

  17. Development of Bait Stations for Fruit Fly Suppression in Support of SIT. Working Material

    International Nuclear Information System (INIS)

    2009-01-01

    A more economic and practical fruit fly suppression tool is needed to replace conventional aerial and ground bait sprays applications over human settlements, protected natural areas, and difficult to access areas where fruit fly hosts exist. This has been a major request from area-wide integrated pest management action programmes using the Sterile Insect Technique (SIT) as a component. In recent years, especially in Europe, most conventional insecticides used to control fruit pests have been banned (e.g. malathion, dichlorvos and other organophosphates), therefore areas producing fruits and vegetables for markets that request low insecticide residues or even fruit and vegetable organic farming is seeking for a more economic fruit fly control option to the spinosad-based bait sprays and to the use of mass trapping. To address these requests, bait stations can be one of the most suitable alternatives. The development of these devices needs to take into consideration cost-effectiveness, and long lasting attractants and killing agents, and should target female fruit flies. Recent developments of synthetic food attractants and long-lasting formulations open the possibility to improve the existent baits stations or develop new ones. With this objective the Insect Pest Control Subprogramme of the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture organized a Consultants Meeting ('Development of Bait Stations for Fruit Fly Suppression in Support of SIT'), held in Mazatlan, Mexico, from 30 October to 1 November 2008, with the participation of 14 scientists from the Instituto Nacional de Tecnologia Agropecuaria, Argentina; Department of Primary Industries and Fisheries, Australia; North American Plant Protection Organization, Canada; African Insect Science for Food and Health, Kenya; Universidad Politecnica de Valencia, Spain; Institut de Recerca i Tecnologia Agroalimentaries, Spain, Secretaria de Agricultura, Ganaderia, Desarrollo Rural, Pesca y

  18. Simulant Development for LAWPS Testing

    Energy Technology Data Exchange (ETDEWEB)

    Russell, Renee L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schonewill, Philip P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Burns, Carolyn A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-23

    This report describes simulant development work that was conducted to support the technology maturation of the LAWPS facility. Desired simulant physical properties (density, viscosity, solids concentration, solid particle size), sodium concentrations, and general anion identifications were provided by WRPS. The simulant recipes, particularly a “nominal” 5.6M Na simulant, are intended to be tested at several scales, ranging from bench-scale (500 mL) to full-scale. Each simulant formulation was selected to be chemically representative of the waste streams anticipated to be fed to the LAWPS system, and used the current version of the LAWPS waste specification as a formulation basis. After simulant development iterations, four simulants of varying sodium concentration (5.6M, 6.0M, 4.0M, and 8.0M) were prepared and characterized. The formulation basis, development testing, and final simulant recipes and characterization data for these four simulants are presented in this report.

  19. IEEE standard criteria for type tests of class 1E modules used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The Institute of Electrical and Electronics Engineers has generated this document to provide direction for type testing Class 1E modules and obtaining specific type test data. It supplements IEEE Std 323-1974, Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for Class 1E equipment qualification. Adherence to this document alone may not suffice for assuring public health and safety because it is the integrated performance of the structures, the fluid systems, the electrical systems, the instrumentation systems of the station, and in particular, the plant protection system of which these modules are a part that prevents accidents or limits the consequences of accidents. Each applicant to the Nuclear Regulatory Commission for a license to operate a nuclear power generating station has the responsibility to assure himself and others that this document, if used, is pertinent to his application and that the integrated performance of his station is adequate

  20. The network architecture and site test of DCIS in Lungmen nuclear power station

    International Nuclear Information System (INIS)

    Lee, C. K.

    2006-01-01

    The Lungmen Nuclear Power Station (LMNPS) is located in North-Eastern Seashore of Taiwan. LMNPP has two units. Each unit generates 1350 Megawatts. It is the first ABWR Plant in Taiwan and is under-construction now. Due to contractual arrangement, there are seven large I and C suppliers/designers, which are GE NUMAC, DRS, Invensys, GEIS, Hitachi, MHI, and Stone and Webster company. The Distributed Control and Information System (DCIS) in Lungmen are fully integrated with the state-of-the-art computer and network technology. General Electric is the leading designer for integration of DCIS. This paper presents Network Architecture and the Site Test of DCIS. The network architectures are follows. GE NUMAC System adopts the point to point architecture, DRS System adopts Ring type architecture with SCRAMNET protocol, Inevnsys system adopts IGiga Byte Backbone mesh network with Rapid Spanning Tree Protocol, GEIS adopts Ethernet network with EGD protocol, Hitachi adopts ring type network with proprietary protocol. MHI adopt Ethernet network with UDP. The data-links are used for connection between different suppliers. The DCIS architecture supports the plant automation, the alarm prioritization and alarm suppression, and uniform MMI screen for entire plant. The Test Program regarding the integration of different network architectures and Initial DCIS architecture Setup for 161KV Energization will be discussed. Test tool for improving site test schedule, and lessons learned from FAT will be discussed too. And conclusions are at the end of this paper. (authors)

  1. The network architecture and site test of DCIS in Lungmen nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Lee, C. K. [Instrument and Control Section, Lungmen Nuclear Power Station, Taiwan Power Company, Taipei County Taiwan (China)

    2006-07-01

    The Lungmen Nuclear Power Station (LMNPS) is located in North-Eastern Seashore of Taiwan. LMNPP has two units. Each unit generates 1350 Megawatts. It is the first ABWR Plant in Taiwan and is under-construction now. Due to contractual arrangement, there are seven large I and C suppliers/designers, which are GE NUMAC, DRS, Invensys, GEIS, Hitachi, MHI, and Stone and Webster company. The Distributed Control and Information System (DCIS) in Lungmen are fully integrated with the state-of-the-art computer and network technology. General Electric is the leading designer for integration of DCIS. This paper presents Network Architecture and the Site Test of DCIS. The network architectures are follows. GE NUMAC System adopts the point to point architecture, DRS System adopts Ring type architecture with SCRAMNET protocol, Inevnsys system adopts IGiga Byte Backbone mesh network with Rapid Spanning Tree Protocol, GEIS adopts Ethernet network with EGD protocol, Hitachi adopts ring type network with proprietary protocol. MHI adopt Ethernet network with UDP. The data-links are used for connection between different suppliers. The DCIS architecture supports the plant automation, the alarm prioritization and alarm suppression, and uniform MMI screen for entire plant. The Test Program regarding the integration of different network architectures and Initial DCIS architecture Setup for 161KV Energization will be discussed. Test tool for improving site test schedule, and lessons learned from FAT will be discussed too. And conclusions are at the end of this paper. (authors)

  2. SiPM application for a detector for UHE neutrinos tested at Sphinx station

    International Nuclear Information System (INIS)

    Iori, M.; Atakisi, I.O.; Chiodi, G.; Denizli, H.; Ferrarotto, F.; Kaya, M.; Yilmaz, A.; Recchia, L.; Russ, J.

    2014-01-01

    We present the preliminary test results of the prototype detector, working at Sphinx Observatory Center, Jungfraujoch (∼3800 m a.s.l.) HFSJG – Switzerland. This prototype detector is designed to measure large zenith angle showers produced by high energy neutrino interactions in the Earth crust. This station provides us an opportunity to understand if the prototype detector works safely (or not) under hard environmental conditions (the air temperature changes between −25 °C and −5 °C). The detector prototype is using silicon photomultiplier (SiPM) produced by SensL and DRS4 chip as read-out part. Measurements at different temperature at fixed bias voltage (∼29.5 V) were performed to reconstruct tracks by Time Of Flight

  3. SiPM application for a detector for UHE neutrinos tested at Sphinx station

    Science.gov (United States)

    Iori, M.; Atakisi, I. O.; Chiodi, G.; Denizli, H.; Ferrarotto, F.; Kaya, M.; Yilmaz, A.; Recchia, L.; Russ, J.

    2014-04-01

    We present the preliminary test results of the prototype detector, working at Sphinx Observatory Center, Jungfraujoch (~3800 m a.s.l.) HFSJG - Switzerland. This prototype detector is designed to measure large zenith angle showers produced by high energy neutrino interactions in the Earth crust. This station provides us an opportunity to understand if the prototype detector works safely (or not) under hard environmental conditions (the air temperature changes between -25 °C and -5 °C). The detector prototype is using silicon photomultiplier (SiPM) produced by SensL and DRS4 chip as read-out part. Measurements at different temperature at fixed bias voltage (~29.5 V) were performed to reconstruct tracks by Time Of Flight.

  4. SiPM application for a detector for UHE neutrinos tested at Sphinx station

    Energy Technology Data Exchange (ETDEWEB)

    Iori, M. [Sapienza University of Rome, Piazzale A. Moro 5, 00185 Rome (Italy); Atakisi, I.O. [University of Kafkas, 36100 Kars (Turkey); Chiodi, G. [INFN, Sezione Roma 1, Piazzale A. Moro 2, 00185 Rome (Italy); Denizli, H. [Abant Izzet Baysal University, 14280 Bolu (Turkey); Ferrarotto, F. [INFN, Sezione Roma 1, Piazzale A. Moro 2, 00185 Rome (Italy); Kaya, M. [University of Kafkas, 36100 Kars (Turkey); Yilmaz, A. [Abant Izzet Baysal University, 14280 Bolu (Turkey); Recchia, L. [INFN, Sezione Roma 1, Piazzale A. Moro 2, 00185 Rome (Italy); Russ, J. [Carnegie-Mellon University, Pittsburgh, PA 15213 (United States)

    2014-04-01

    We present the preliminary test results of the prototype detector, working at Sphinx Observatory Center, Jungfraujoch (∼3800 m a.s.l.) HFSJG – Switzerland. This prototype detector is designed to measure large zenith angle showers produced by high energy neutrino interactions in the Earth crust. This station provides us an opportunity to understand if the prototype detector works safely (or not) under hard environmental conditions (the air temperature changes between −25 °C and −5 °C). The detector prototype is using silicon photomultiplier (SiPM) produced by SensL and DRS4 chip as read-out part. Measurements at different temperature at fixed bias voltage (∼29.5 V) were performed to reconstruct tracks by Time Of Flight.

  5. The association between disease and profitability in individual finishing boars at a test station

    DEFF Research Database (Denmark)

    Jensen, Tina Birk; Baadsgaard, Niels Peter; Houe, Hans

    2008-01-01

    Endemic diseases in finisher herds are considered to be costly for the pig producer. We investigated the effect of diseases on the profit margin using data from a Danish boar test station (n = 5777) collected from July 2002 to December 2004. Boars reaching a target slaughter weight of at least 80...... kg were included in the study. Oral and parenteral treatments were used as indicator of disease in the finishing period and, pathological lesions were used as indicator of disease at slaughter. Profit margin was calculated individually for each boar as the difference between the total revenue......: profit margin. The results showed that treatment in the finishing period had a negative effect on the profit margin. According to the least square means estimates, boars that were treated parenterally had a reduction in the profit margin of 2.24 €. This corresponded to a reduction in the profit margin...

  6. Modified SPC for short run test and measurement process in multi-stations

    Science.gov (United States)

    Koh, C. K.; Chin, J. F.; Kamaruddin, S.

    2018-03-01

    Due to short production runs and measurement error inherent in electronic test and measurement (T&M) processes, continuous quality monitoring through real-time statistical process control (SPC) is challenging. Industry practice allows the installation of guard band using measurement uncertainty to reduce the width of acceptance limit, as an indirect way to compensate the measurement errors. This paper presents a new SPC model combining modified guard band and control charts (\\bar{\\text{Z}} chart and W chart) for short runs in T&M process in multi-stations. The proposed model standardizes the observed value with measurement target (T) and rationed measurement uncertainty (U). S-factor (S f) is introduced to the control limits to improve the sensitivity in detecting small shifts. The model was embedded in automated quality control system and verified with a case study in real industry.

  7. Pn seismic wave travel time at the Semipalatinsk Test Site - Borovoe seismic station trace

    International Nuclear Information System (INIS)

    An, V.A.; Kaazik, P.B.; Ovchinnikov, V.M.

    2001-01-01

    This paper preparation involved 160 explosions at the Degelen Site conducted in 1961-1989 and 89 explosions at the Balapan Site conducted in 1968-1989. Pn wave travel time was tied to the sea level in accordance with velocity characteristics of the explosion hypocenter medium; and to average epicentral distance for every site basing on their local travel time curves of Pn wave relative to Borovoe station. Maximum amplitude of mean-year travel times variations is 0.3-0.5 s as at the Nevada Test Site - Borovoe trace and Mirniy (Antarctica). However, the linear trend in contrast to previous traces has negative sign (0.08 s for Degelen and 0.1 s for Balapan). Thus, Pn wave velocity increases with calendar time. (author)

  8. Automated subsystems control development. [for life support systems of space station

    Science.gov (United States)

    Block, R. F.; Heppner, D. B.; Samonski, F. H., Jr.; Lance, N., Jr.

    1985-01-01

    NASA has the objective to launch a Space Station in the 1990s. It has been found that the success of the Space Station engineering development, the achievement of initial operational capability (IOC), and the operation of a productive Space Station will depend heavily on the implementation of an effective automation and control approach. For the development of technology needed to implement the required automation and control function, a contract entitled 'Automated Subsystems Control for Life Support Systems' (ASCLSS) was awarded to two American companies. The present paper provides a description of the ASCLSS program. Attention is given to an automation and control architecture study, a generic automation and control approach for hardware demonstration, a standard software approach, application of Air Revitalization Group (ARG) process simulators, and a generic man-machine interface.

  9. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  10. The in-situ testing of high efficiency particulate filters in the CEGB south eastern region nuclear power stations

    International Nuclear Information System (INIS)

    Powell, A.W.; Wilkinson, B.A.

    1977-01-01

    High efficiency air filters are installed in the CEGB's Nuclear Power Stations to prevent discharge of radioactive material to the environment should the ventilation air become contaminated. The Board has determined that these filter units should be tested in-situ to ensure that the stringent design specifications are met. This paper describes the rig work comparing the British Standard method using sodium chloride aerosol with other test methods, such as Dioctyl Phthalate, naturally occurring dust aerosols and artificially produced condensation nuclei. This work led to the development of an in-situ test method using condensation nuclei and a Pollak-Nolan nucleus counter. The advantages and disadvantages of this method over other methods for in-situ testing is discussed. The test method has been used in the South Eastern Region for several years and considerable experience has been gained in its use on a wide variety of filter systems. The method adopted for each system is detailed including the injection, sampling and interpretation of the results obtained. Numerous faults and difficulties have been highlighted from the design, installation and filter changing aspects

  11. Experiences for construction and preoperation test of Shimane nuclear power station

    International Nuclear Information System (INIS)

    Niki, Yoshiya; Taniguchi, Takashi.

    1975-01-01

    Shimane nuclear power station of Chugoku Electric Power Company has begun its commercial operation on March 29, 1974 after the construction period of 49.5 months. The fundamental construction process which Chugoku Electric Power Company and Hitachi Ltd. had agreed was 45 month process, which was the readjustment of the construction process which General Electric Company had presented for preceding nuclear power plants in Japan and its results. The achieved construction and test process required 49.5 months with 4.5 months delay. This delay occurred in two points. The one was caused by the ''upside down'' problem of control rods which had been imported from G.E. The another was caused by the restriction of the rate of load increasing. Fuel charging which indicates the substantial finish of construction works, had begun at May 1, 1973 on schedule. Therefore it can be said that the construction works had been carried out just according to the fundamental process. However, analyzing the result of progress, the pressure test of a reactor containment vessel and the set-up and the first pressure test of a reactor pressure vessel led the schedule by about 2 months. On the contrary, the subsequent works delayed by just that leading time. (Tai, I.)

  12. On test results of the superconducting magnetic energy storage (SMES) system in Ariuragawa Power Station

    International Nuclear Information System (INIS)

    Katahira, Osamu; Fukui, Fumihiko; Karano, Koichi; Irie, Fujio; Takeo, Masakatsu; Okada, Hidehiko; Shimojo, Toshikazu.

    1991-01-01

    SMES system is that for storing electric energy in the form of magnetic energy by flowing DC current through a superconducting coil by utilizing the characteristics of its superconductivity. It comprises a superconducting coil for storing energy, an AC-DC converter, the cooling system for maintaining extremely low temperature and so on. The features of SMES are the high efficiency of storing electric energy (more than 90 % in the large scale system), the fast response to store and release electric power, and effective power and reactive power can be independently and arbitrarily controlled. It is expected that SMES can be applied to the stabilization of electric power system, the adjustment of system voltage, the adjustment of varying load and so on. In order to verify the results of the laboratory research in actual power system, the system test was carried out in Ariuragawa Power Station on November 20-22, 1990. The outline of the test, the method of controlling SMES, the test results and the examination of the results are reported. (K.I.)

  13. Analysis of technological innovation in Danish wind turbine industry - including the Test Station for Windturbines dual roll as research institution and certification authority

    International Nuclear Information System (INIS)

    Dannemand Andersen, P.

    1993-01-01

    The overall aim of this thesis is to examine the interactions between the Danish wind turbine industry and the Test Station for Wind Turbines. Because these interactions are concerning technological innovation, it follows that the innovation processes within the enterprises must be analyzed and modelled. The study is carried out as an iterative model-developing process using case study methods. The findings from some less structured interviews are discussed with literature and forms a basis for models and new interviews. The thesis is based on interviews with 20 R and D engineers in the Danish wind turbine industry, 7 engineers at The Test Station and 7 people involved in wind power abroad (American and British). The theoretical frame for this thesis is sociology/organizational theory and industrial engineering. The thesis consists of five main sections, dealing with technology and knowledge, innovation processes, organizational culture, innovation and interaction between the Test Station's research activities and the companies' innovation processes, and finally interaction through the Test Stations certification activity. First a taxonomy for technology and knowledge is established in order to clarify what kind of technology the interactions are all about, and what kind of knowledge is transferred during the interactions. This part of the thesis also contains an analysis of the patents drawn by the Danish wind turbine industry. The analysis shows that the Danish wind turbine industry do not use patents. Instead the nature of the technology and the speed of innovation are used to protect the industry's knowledge. (EG) (192 refs.)

  14. Development of the Triple Theta assembly station with machine vision feedback

    International Nuclear Information System (INIS)

    Schmidt, Derek William

    2008-01-01

    Increased requirements for tighter tolerances on assembled target components in complex three-dimensional geometries with only days to assemble complete campaigns require the implementation of a computer-controlled high-precision assembly station. Over the last year, an 11-axis computer-controlled assembly station has been designed and built with custom software to handle the multiple coordinate systems and automatically calculate all relational positions. Preliminary development efforts have also been done to explore the benefit of a machine vision feedback module with a dual-camera viewing system to automate certain basic features like crosshair calibration, component leveling, and component centering.

  15. Development of an automated checkout, service and maintenance system for a Space Station EVAS

    Science.gov (United States)

    Abeles, Fred J.; Tri, Terry; Blaser, Robert

    1988-01-01

    The development of a new operational system for the Space Station will minimize the time normally spent on performing on-orbit checkout, servicing, and maintenance of an extravehicular activity system of the Space Station. This system, the Checkout, Servicing, and Maintenance System (COSM), is composed of interactive control software interfacing with software simulations of hardware components. The major elements covered in detail include the controller, the EMU simulator and the regenerative life support system. The operational requirements and interactions of the individual elements as well as the protocols are also discussed.

  16. Developments in health physics at Electricite de France, implementation at Guangdong Nuclear Power Station

    International Nuclear Information System (INIS)

    Yang Maochun

    1993-01-01

    The Guangdong Nuclear Power Station intend to apply the same organization and the same principle in health physics as EDF (ELECTRICITE DE FRANCE). The permanent 'clean plant' objective has ensured that the internal exposure of nuclear plant workers has remained virtually zero. This, then, is the basis on which EDF is now continuing to develop health physics in its plants

  17. Microbiological Tests Performed During the Design of the International Space Station ECLSS: Part 1, Bulk Phase Water and Wastewater

    Science.gov (United States)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    This slide presentation summarizes the studies performed to assess the bulk phase microbial community during the Space Station Water Recover Tests (WRT) from 1990-1998. These tests show that it is possible to recycle water from different sources including urine, and produce water that can exceed the quality of municpally produced tap water.

  18. Detector development and test facility

    International Nuclear Information System (INIS)

    Reeder, D.D.

    1993-01-01

    Following the ideas presented in the proposal to the DoE, we have begun to acquire the equipment needed to design, develop construct and test the electronic and mechanical features of detectors used in High Energy Physics Experiments. A guiding principle for the effort is to achieve integrated electronic and mechanical designs which meet the demanding specifications of the modern hadron collider environment yet minimize costs. This requires state of the art simulation of signal processing as well as detailed calculations of heat transfer and finite element analysis of structural integrity

  19. Development and Deployment of Robonaut 2 to the International Space Station

    Science.gov (United States)

    Ambrose, Robert O.

    2011-01-01

    The development of the Robonaut 2 (R2) system was a joint endeavor with NASA and General Motors, producing robots strong enough to do work, yet safe enough to be trusted to work near humans. To date two R2 units have been produced, designated as R2A and R2B. This follows more than a decade of work on the Robonaut 1 units that produced advances in dexterity, tele-presence, remote supervision across time delay, combining mobility with manipulation, human-robot interaction, force control and autonomous grasping. Design challenges for the R2 included higher speed, smaller packaging, more dexterous fingers, more sensitive perception, soft drivetrain design, and the overall implementation of a system software approach for human safety, At the time of this writing the R2B unit was poised for launch to the International Space Station (ISS) aboard STS-133. R2 will be the first humanoid robot in space, and is arguably the most sophisticated robot in the world, bringing NASA into the 21st century as the world's leader in this field. Joining the other robots already on ISS, the station is now an exciting lab for robot experiments and utilization. A particular challenge for this project has been the design and certification of the robot and its software for work near humans. The 3 layer software systems will be described, and the path to ISS certification will be reviewed. R2 will go through a series of ISS checkout tests during 2011. A taskboard was shipped with the robot that will be used to compare R2B's dexterous manipulation in zero gravity with the ground robot s ability to handle similar objects in Earth s gravity. R2's taskboard has panels with increasingly difficult tasks, starting with switches, progressing to connectors and eventually handling softgoods. The taskboard is modular, and new interfaces and experiments will be built up using equipment already on ISS. Since the objective is to test R2 performing tasks with human interfaces, hardware abounds on ISS and the

  20. Nickel-Hydrogen Battery Cell Life Test Program Update for the International Space Station

    Science.gov (United States)

    Miller, Thomas B.

    2000-01-01

    NASA and Boeing North America are responsible for constructing the electrical power system for the International Space Station (ISS), which circles the Earth every 90 minutes in a low Earth orbit (LEO). For approximately 55 minutes of this orbit, the ISS is in sunlight, and for the remaining 35 minutes, the ISS is in the Earth s shadow (eclipse). The electrical power system must not only provide power during the sunlight portion by means of the solar arrays, but also store energy for use during the eclipse. Nickel-hydrogen (Ni/H2) battery cells were selected as the energy storage systems for ISS. Each battery Orbital Replacement Unit (ORU) comprises 38 individual series-connected Ni/H2 battery cells, and there are 48 battery ORU s on the ISS. On the basis of a limited Ni/H2 LEO data base on life and performance characteristics, the NASA Glenn Research Center at Lewis Field commenced testing through two test programs: one in-house and one at the Naval Surface Warfare Center in Crane, Indiana.

  1. Advanced Software Ground Station and UAV Development for NLoS Control Using Mobile Communications

    Directory of Open Access Journals (Sweden)

    Amr AbdElHamid

    2015-01-01

    Full Text Available Over the last decades, Unmanned Aerial Systems (UASs have gained much attention due to their various applications in different sections. However, their communication range is limited to utilized communication equipment. Therefore, utilization of GSM channels opens a new prospect towards long distance UAV missions and mobile command and control centers. This paper demonstrates new design and development of a small-scale UAV and a Ground Control Station (GCS using GSM bidirectional communications for Non-Line of Sight (NLoS long range control. GCSs are considered the front end node in UAV guidance process. Therefore, the proposed GCS employs a two-layer framework to consider all ground pilot requirements. Moreover, a new exploitation of global weather forecast data is added to the GCS. On the other hand, the proposed airborne system utilizes a new integration of different Commercial off-the-Shelf (COTS components and excludes short range receivers. The ground and flight tests show that stable bidirectional GSM communication is established, reliable hardware integration is accomplished, real time performance is achieved, GCS functional fidelity is obtained, and low cost is maintained. Finally, some qualitative aspects of the proposed platform are presented to address the detailed features.

  2. Alternative Water Processor Test Development

    Science.gov (United States)

    Pickering, Karen D.; Mitchell, Julie; Vega, Leticia; Adam, Niklas; Flynn, Michael; Wjee (er. Rau); Lunn, Griffin; Jackson, Andrew

    2012-01-01

    The Next Generation Life Support Project is developing an Alternative Water Processor (AWP) as a candidate water recovery system for long duration exploration missions. The AWP consists of biological water processor (BWP) integrated with a forward osmosis secondary treatment system (FOST). The basis of the BWP is a membrane aerated biological reactor (MABR), developed in concert with Texas Tech University. Bacteria located within the MABR metabolize organic material in wastewater, converting approximately 90% of the total organic carbon to carbon dioxide. In addition, bacteria convert a portion of the ammonia-nitrogen present in the wastewater to nitrogen gas, through a combination of nitrogen and denitrification. The effluent from the BWP system is low in organic contaminants, but high in total dissolved solids. The FOST system, integrated downstream of the BWP, removes dissolved solids through a combination of concentration-driven forward osmosis and pressure driven reverse osmosis. The integrated system is expected to produce water with a total organic carbon less than 50 mg/l and dissolved solids that meet potable water requirements for spaceflight. This paper describes the test definition, the design of the BWP and FOST subsystems, and plans for integrated testing.

  3. Developing Tests of Visual Dependency

    Science.gov (United States)

    Kindrat, Alexandra N.

    2011-01-01

    Astronauts develop neural adaptive responses to microgravity during space flight. Consequently these adaptive responses cause maladaptive disturbances in balance and gait function when astronauts return to Earth and are re-exposed to gravity. Current research in the Neuroscience Laboratories at NASA-JSC is focused on understanding how exposure to space flight produces post-flight disturbances in balance and gait control and developing training programs designed to facilitate the rapid recovery of functional mobility after space flight. In concert with these disturbances, astronauts also often report an increase in their visual dependency during space flight. To better understand this phenomenon, studies were conducted with specially designed training programs focusing on visual dependency with the aim to understand and enhance subjects ability to rapidly adapt to novel sensory situations. The Rod and Frame test (RFT) was used first to assess an individual s visual dependency, using a variety of testing techniques. Once assessed, subjects were asked to perform two novel tasks under transformation (both the Pegboard and Cube Construction tasks). Results indicate that head position cues and initial visual test conditions had no effect on an individual s visual dependency scores. Subjects were also able to adapt to the manual tasks after several trials. Individual visual dependency correlated with ability to adapt manual to a novel visual distortion only for the cube task. Subjects with higher visual dependency showed decreased ability to adapt to this task. Ultimately, it was revealed that the RFT may serve as an effective prediction tool to produce individualized adaptability training prescriptions that target the specific sensory profile of each crewmember.

  4. Development of equipment reliability process using predictive technologies at Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Taniguchi, Yuji; Sakuragi, Futoshi; Hamada, Seiichi

    2014-01-01

    Development of equipment reliability(ER) process, specifically for predictive maintenance (PdM) technologies integrated condition based maintenance (CBM) process, at Hamaoka Nuclear Power Station is introduced in this paper. Integration of predictive maintenance technologies such as vibration, oil analysis and thermo monitoring is more than important to establish strong maintenance strategies and to direct a specific technical development. In addition, a practical example of CBM is also presented to support the advantage of the idea. (author)

  5. Measuring Transit Oriented Development of Existing Urban Areas around Metro Stations in Faridabad City

    Directory of Open Access Journals (Sweden)

    Sat Pal

    2018-01-01

    Full Text Available Urban population in Indian cities is encouraging auto reliance and having unsafe economic, social and environmental consequences. Land-use-change patterns are the outcome of the complex relations between the human and the physical surroundings. To address these issues the planners are moving beyond land use planning to a sustainable development. Transit and Land use planning are important components to achieve sustainable future of urban development. TOD is a planning tool to encourage this integration. This paper discusses the land use scenario and opportunity around four Metro transit stations in Faridabad city. Different methods and various sets of indicators are considered to evaluate and measure TOD index in this study. This study will evaluate and measure the Faridabad city in the context of land use around Metro Stations to support TOD. This paper seeks to answer how to promote walkable communities, compact and transit-oriented development (TOD that incorporates mixed land use development, including neighbourhood schools, retail and business related space and a mix range of housing types within walkable distance. This paper concludes that the stations area which had a low TOD score needs to have policy for improvement. If planned efficiently, TODs can realize the sustainable development with considerable change in the urban development that focuses on pedestrian based neighbourhood planning.

  6. Space Station galley design

    Science.gov (United States)

    Trabanino, Rudy; Murphy, George L.; Yakut, M. M.

    1986-01-01

    An Advanced Food Hardware System galley for the initial operating capability (IOC) Space Station is discussed. Space Station will employ food hardware items that have never been flown in space, such as a dishwasher, microwave oven, blender/mixer, bulk food and beverage dispensers, automated food inventory management, a trash compactor, and an advanced technology refrigerator/freezer. These new technologies and designs are described and the trades, design, development, and testing associated with each are summarized.

  7. National Seismic Station

    International Nuclear Information System (INIS)

    Stokes, P.A.

    1982-06-01

    The National Seismic Station was developed to meet the needs of regional or worldwide seismic monitoring of underground nuclear explosions to verify compliance with a nuclear test ban treaty. The Station acquires broadband seismic data and transmits it via satellite to a data center. It is capable of unattended operation for periods of at least a year, and will detect any tampering that could result in the transmission of unauthentic seismic data

  8. International Space Station (ISS) Bacterial Filter Elements (BFEs): Filter Efficiency and Pressure Testing of Returned Units

    Science.gov (United States)

    Green, Robert D.; Agui, Juan H.; Vijayakumar, R.

    2017-01-01

    The air revitalization system aboard the International Space Station (ISS) provides the vital function of maintaining a clean cabin environment for the crew and the hardware. This becomes a serious challenge in pressurized space compartments since no outside air ventilation is possible, and a larger particulate load is imposed on the filtration system due to lack of sedimentation due to the microgravity environment in Low Earth Orbit (LEO). The ISS Environmental Control and Life Support (ECLS) system architecture in the U.S. Segment uses a distributed particulate filtration approach consisting of traditional High-Efficiency Particulate Adsorption (HEPA) media filters deployed at multiple locations in each U.S. Segment module; these filters are referred to as Bacterial Filter Elements, or BFEs. These filters see a replacement interval, as part of maintenance, of 2-5 years dependent on location in the ISS. In this work, we present particulate removal efficiency, pressure drop, and leak test results for a sample set of 8 BFEs returned from the ISS after filter replacement. The results can potentially be utilized by the ISS Program to ascertain whether the present replacement interval can be maintained or extended to balance the on-ground filter inventory with extension of the lifetime of ISS beyond 2024. These results can also provide meaningful guidance for particulate filter designs under consideration for future deep space exploration missions.

  9. Construction and start-up testing experience of Kashiwazakikariwa Nuclear Power Station Unit No.1

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Murakami, Hideaki

    1986-01-01

    In order to overcome the new location condition in Japan Sea coast, new techniques were developed and adopted to ensure the safety in construction and to shorten the construction period as far as possible. The commercial operation was started on September 18, 1985. This plant is a BWR plant of 1100 MWe output. The results of the improvement and standardization of BWRs and the measures for reliability improvement and radiation dose reduction were fully adopted in this plant. The site of the power station and the layout of the main facilities are explained. As the features of the location condition, the severe weather condition in winter such as snow, wind and lightning and high waves in the sea were considered. The rockbed for installing the foundation of the reactor building was deep, and the aseismatic design condition was made stricter, accordingly, the quantity of materials increased. A tent dome was developed to cover above the reactor containment vessel being assembled, a lightning forecast system was installed, and synchro-lift method was adopted for caisson breakwaters. The countermeasures to the deep rockbed and the measures to shorten the construction period were taken. The results of the trial operation are reported. (Kako, I.)

  10. International Space Station Lithium-Ion Main Battery Thermal Runaway Propagation Test

    Science.gov (United States)

    Dalton, Penni J.; North, Tim

    2017-01-01

    In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the aging Ni-H2 batteries on the primary Electric Power System (EPS). After the Boeing 787 Li-Ion battery fires, the NASA Engineering and Safety Center (NESC) Power Technical Discipline Team was tasked by ISS to investigate the possibility of Thermal Runaway Propagation (TRP) in all Li-Ion batteries used on the ISS. As part of that investigation, NESC funded a TRP test of an ISS EPS non-flight Li-Ion battery. The test was performed at NASA White Sands Test Facility in October 2016. This paper will discuss the work leading up to the test, the design of the test article, and the test results.

  11. Development and Optimized Design of Propeller Pump System & Structure with VFD in Low-head Pumping Station

    Science.gov (United States)

    Rentian, Zhang; Honggeng, Zhu; Arnold, Jaap; Linbi, Yao

    2010-06-01

    Compared with vertical-installed pumps, the propeller (bulb tubular) pump systems can achieve higher hydraulic efficiencies, which are particularly suitable for low-head pumping stations. More than four propeller pumping stations are being, or will be built in the first stage of the S-to-N Water Diversion Project in China, diverting water from Yangtze River to the northern part of China to alleviate water-shortage problems and develop the economy. New structures of propeller pump have been developed for specified pumping stations in Jiangsu and Shandong Provinces respectively and Variable Frequency Drives (VFDs) are used in those pumping stations to regulate operating conditions. Based on the Navier-Stokes equations and the standard k-e turbulent model, numerical simulations of the flow field and performance prediction in the propeller pump system were conducted on the platform of commercial software CFX by using the SIMPLEC algorithm. Through optimal design of bulb dimensions and diffuser channel shape, the hydraulic system efficiency has improved evidently. Furthermore, the structures of propeller pumps have been optimized to for the introduction of conventional as well as permanent magnet motors. In order to improve the hydraulic efficiency of pumping systems, both the pump discharge and the motor diameter were optimized respectively. If a conventional motor is used, the diameter of the pump casing has to be increased to accommodate the motor installed inside. If using a permanent magnet motor, the diameter of motor casing can be decreased effectively without decreasing its output power, thus the cross-sectional area is enlarged and the velocity of flowing water decreased favorably to reduce hydraulic loss of discharge channel and thereby raising the pumping system efficiency. Witness model tests were conducted after numerical optimization on specific propeller pump systems, indicating that the model system hydraulic efficiencies can be improved by 0.5%˜3.7% in

  12. Study of the mechanical properties of the electric power station components: the punch test

    International Nuclear Information System (INIS)

    Isselin, J.

    2003-03-01

    The aging of the electric production park implies an increasing need of knowledge concerning the evolution of the mechanical properties of its components. With regard to this problem, the availability in material is more and more small. This work proposes to characterize these properties through a mechanical test called Punch test. The main characteristic of this test is to use very small volume samples. The development of this test has been carried out by the study of a 15 MDV 4-05 steel coming from a steam drum of a thermal power plant after 145000 hours of service. At first, we have measured the influence of the parameters of this test. Then, the study has dealt more particularly on the transition temperature of the material. With the finite element simulation method, the strain hardening coefficient of the material has been determined. (O.M.)

  13. Design, modeling and testing of the Askaryan Radio Array South Pole autonomous renewable power stations

    Energy Technology Data Exchange (ETDEWEB)

    Besson, D.Z., E-mail: zedlam@ku.edu [Department of Physics and Astronomy, University of Kansas, 1082 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Moscow Engineering and Physics Institute, 31 Kashirskaya Highway, Moscow 115409 (Russian Federation); Kennedy, D.M., E-mail: dmkennedy@ku.edu [Department of Physics and Astronomy, University of Kansas, 1082 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Ratzlaff, K., E-mail: ratzlaff@ku.edu [Instrumentation Design Laboratory, University of Kansas, 6042 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Young, R., E-mail: rwyoung@ku.edu [Instrumentation Design Laboratory, University of Kansas, 6042 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States)

    2014-11-01

    We describe the design, construction and operation of the Askaryan Radio Array (ARA) Autonomous Renewable Power Stations, initially installed at the South Pole in December, 2010 with the goal of providing an independently operating 100 W power source capable of year-round operation in extreme environments. In addition to particle astrophysics applications at the South Pole, such a station can easily be, and has since been, extended to operation elsewhere, as described herein.

  14. Design, modeling and testing of the Askaryan Radio Array South Pole autonomous renewable power stations

    International Nuclear Information System (INIS)

    Besson, D.Z.; Kennedy, D.M.; Ratzlaff, K.; Young, R.

    2014-01-01

    We describe the design, construction and operation of the Askaryan Radio Array (ARA) Autonomous Renewable Power Stations, initially installed at the South Pole in December, 2010 with the goal of providing an independently operating 100 W power source capable of year-round operation in extreme environments. In addition to particle astrophysics applications at the South Pole, such a station can easily be, and has since been, extended to operation elsewhere, as described herein

  15. DETERMINING THE STUDENTS’ VIEWS TOWARDS THE LEARNING STATIONS DEVELOPED FOR THE ENVIRONMENTAL EDUCATION

    Directory of Open Access Journals (Sweden)

    Cem Gerçek

    2016-02-01

    Full Text Available This study aims to increase awareness in students in relation to environmental consciousness. Therefore, the prepared presentations and the adapted learning stations were used to create awareness of students in the out-of-the-school learning environment supported by the municipality of a county in Ankara the capital city of Turkey. Learning stations serve to people’s individual study. The basic goal here is to develop higher order skills and to make sure that students work in stations according to their abilities in a pre-determined order. The study group was composed of volunteering 15 fifth graders of a private school in Ankara. Firstly, the content to be applied in the study was developed. Prior to the application, a readiness presentation was made so as to raise students’ interest and awareness in terms of the importance of waste and recycling the waste. As a conclusion of the current study, it may be said that students’ interest in and awareness of the environment and collecting the waste developed. Enlarging this pilot project and applying it to bigger groups is important in terms of the success of the educational activities for separating the waste and in terms of the durability of the relevant behavior.

  16. Type test of Class 1E electric cables, field splices, and connections for nuclear power generating stations - 1975

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    This Standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class 1E Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices

  17. A Cryogenic Test Station for the Pre-series 2400 W @ 1.8 K Refrigeration Units for the LHC

    CERN Document Server

    Claudet, S; Gully, P; Jäger, B; Millet, F; Roussel, P; Tavian, L

    2002-01-01

    The cooling capacity below 2 K for the superconducting magnets in the Large Hadron Collider (LHC), at CERN, will be provided by eight refrigeration units at 1.8 K, each of them coupled to a 4.5 K refrigerator. The supply of the series units is linked to successful testing and acceptance of the pre-series delivered by the two selected vendors. To properly assess the performance of specific components such as cold compressors and some process specificities a dedicated test station is necessary. The test station is able to process up to 130 g/s between 4.5 & 20 K and aims at simulating the steady and transient operational modes foreseen for the LHC. After recalling the basic characteristics of the 1.8 K refrigeration units and the content of the acceptance tests of the pre-series, the principle of the test cryostat is detailed. The components of the test station and corresponding layout are described. The first testing experience is presented as well as preliminary results of the pre-series units.

  18. Development of Dissolution Test Method for Drotaverine ...

    African Journals Online (AJOL)

    Development of Dissolution Test Method for Drotaverine ... Methods: Sink conditions, drug stability and specificity in different dissolution media were tested to optimize a dissolution test .... test by Prism 4.0 software, and differences between ...

  19. Development of a test rig and its application for validation and reliability testing of safety-critical software

    Energy Technology Data Exchange (ETDEWEB)

    Thai, N D; McDonald, A M [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    This paper describes a versatile test rig developed by AECL for functional testing of safety-critical software used in the process trip computers of the Wolsong CANDU stations. The description covers the hardware and software aspects of the test rig, the test language and its interpreter, and other major testing software utilities such as the test oracle, sampler and profiler. The paper also discusses the application of the rig in the final stages of testing of the process trip computer software, namely validation and reliability tests. It shows how random test cases are generated, test scripts prepared and automatically run on the test rig. The versatility of the rig is further demonstrated in other types of testing such as sub-system tests, verification of the test oracle, testing of newly-developed test script, self-test and calibration. (author). 5 tabs., 10 figs.

  20. Development of a test rig and its application for validation and reliability testing of safety-critical software

    International Nuclear Information System (INIS)

    Thai, N.D.; McDonald, A.M.

    1995-01-01

    This paper describes a versatile test rig developed by AECL for functional testing of safety-critical software used in the process trip computers of the Wolsong CANDU stations. The description covers the hardware and software aspects of the test rig, the test language and its interpreter, and other major testing software utilities such as the test oracle, sampler and profiler. The paper also discusses the application of the rig in the final stages of testing of the process trip computer software, namely validation and reliability tests. It shows how random test cases are generated, test scripts prepared and automatically run on the test rig. The versatility of the rig is further demonstrated in other types of testing such as sub-system tests, verification of the test oracle, testing of newly-developed test script, self-test and calibration. (author). 5 tabs., 10 figs

  1. Approach to the assessment of the performance of nondestructive test methods in the manufacture of nuclear power station equipment

    International Nuclear Information System (INIS)

    Michaut, J.P.

    1996-01-01

    The safety of a nuclear power station lies largely in the possibility of ensuring, at the time of in service inspections on major equipment, that the extent of faults which may appear or develop is not greater than that of faults detrimental to behavior in service. This assurance is based on performance demonstration of the nondestructive test methods used for inspecting the equipment in service. This is the subject of numerous studies in various countries. To ensure that manufacturing faults likely to downgrade the safety of the equipment are not discovered in service, it seems desirable to make sure that the performance of the nondestructive test (NDT) methods which are going to be used in manufacture will be at least as high as those used in service and that they are therefore capable of guaranteeing detection of faults clearly less important than really harmful faults. The performance of NDT methods and their consistency with those which can be used in service is evaluated before the start of manufacture on a mock-up representative of the equipment itself. Information is given on research in progress on the bimetal welding of a pressurizer spray nozzle

  2. Development of a machine treating removed shells and others in thermal and nuclear power stations

    International Nuclear Information System (INIS)

    Daiho, Koichi; Iwao, Takenobu

    1981-01-01

    The living things removed form the cooling water systems in thermal and nuclear power stations, such as shells and jelly fish, have been disposed by burying in the premises, but it is the actual situation that the occurrence of bad smell and the securing of land for burying are the worries. Accordingly, a machine for deodorizing the removed living things was manufactured for trial, and the treatment experiment was carried out in Chita Power Station. This treating machine dries the removed living things around 200 deg C, and makes the deodorizing treatment. The treated products can be utilized effectively as fertilizer, and the prospect to put this machine in practical use as a waste treatment machine of resource re-utilization type was obtained. General Technical Research Institute, Chubu Electric Power Co., Inc., has developed a machine treating abandoned fish for making organic fertilizer, and its principle was applied to the development of this treating machine. The treating capacity of this machine is 1 t/day, and the power consumption is 9.3 kW. The waste oil from power stations of about 15 l/h is used as the fuel. A crusher, a constant feed screw conveyer and a rotary kiln for drying are used. In the treating experiment, about 30 t of shells and others were treated during 51 days. The results are reported. (Kako, I.)

  3. NASA Systems Autonomy Demonstration Project - Development of Space Station automation technology

    Science.gov (United States)

    Bull, John S.; Brown, Richard; Friedland, Peter; Wong, Carla M.; Bates, William

    1987-01-01

    A 1984 Congressional expansion of the 1958 National Aeronautics and Space Act mandated that NASA conduct programs, as part of the Space Station program, which will yield the U.S. material benefits, particularly in the areas of advanced automation and robotics systems. Demonstration programs are scheduled for automated systems such as the thermal control, expert system coordination of Station subsystems, and automation of multiple subsystems. The programs focus the R&D efforts and provide a gateway for transfer of technology to industry. The NASA Office of Aeronautics and Space Technology is responsible for directing, funding and evaluating the Systems Autonomy Demonstration Project, which will include simulated interactions between novice personnel and astronauts and several automated, expert subsystems to explore the effectiveness of the man-machine interface being developed. Features and progress on the TEXSYS prototype thermal control system expert system are outlined.

  4. Phytotoxicology section investigation in the vicinity of the Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the Darlington Nuclear Generating Station, in October, 1989

    International Nuclear Information System (INIS)

    1991-02-01

    The Phytotoxicology Section, Air Resources Branch is a participant in the Pickering and Bruce Nuclear Contingency Plans. The Phytotoxicology Emergency Response Team is responsible for collecting vegetation samples in the event of a nuclear emergency at any of the nuclear generating stations in the province. As part of its responsibility the Phytotoxicology Section collects samples around the nuclear generating stations for comparison purposes in the event of an emergency. Because of the limited frequency of sampling, the data from the surveys are not intended to be used as part of a regulatory monitoring program. These data represent an effort by the MOE to begin to establish a data base of tritium concentrations in vegetation. The Phytotoxicology Section has carried out seven surveys in the vicinity of Ontario Hydro nuclear generating stations since 1981. Surveys were conducted for tritium in snow in the vicinity of Bruce Nuclear Power Development (BNPD), February, 1981; tritium in cell-free water of white ash in the vicinity of BNPD, September, 1981; tritium in snow in the vicinity of BNPD, March, 1982; tritium in tree sap in the vicinity of BNPD, April, 1982; tritium in tree sap in the vicinity of BNPD, April, 1984, tritium in the cell-free water of white ash in the vicinity of BNPD, September, 1985; and, tritium in cell-free water of grass in the vicinity of Pickering Nuclear Generation Station (PNGS), October 1986. In all cases a pattern of decreasing tritium levels with increasing distance from the stations was observed. In October, 1989, assessment surveys were conducted around Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the new Darlington Nuclear Generating Station (DNGS). The purpose of these surveys was to provide baseline data for tritium in cell-free water of grass at all three locations at the same time of year. As none of the reactor units at DNGS had been brought on line at the time of the survey, this data was to be

  5. Performance Testing of Massive MIMO Base Station with Multi-Probe Anechoic Chamber Setups

    DEFF Research Database (Denmark)

    Zhang, Fengchun; Fan, Wei; Ji, Yilin

    2018-01-01

    The utilization of massive multiple-input multipleoutput (MIMO) antenna arrays at the base station (BS) side has been identified as an enabling technique for 5G communication systems. To evaluate the true end-to-end performance of BS's, an over-the-air (OTA) radiated method is required...

  6. EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory

    Science.gov (United States)

    Jairala, Juniper C.; Durkin, Robert; Marak, Ralph J.; Sipila, Stepahnie A.; Ney, Zane A.; Parazynski, Scott E.; Thomason, Arthur H.

    2012-01-01

    As an early step in the preparation for future Extravehicular Activities (EVAs), astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. Neutral buoyancy demonstrations at NASA Johnson Space Center's Sonny Carter Training Facility to date have primarily evaluated assembly and maintenance tasks associated with several elements of the International Space Station (ISS). With the retirement of the Shuttle, completion of ISS assembly, and introduction of commercial players for human transportation to space, evaluations at the Neutral Buoyancy Laboratory (NBL) will take on a new focus. Test objectives are selected for their criticality, lack of previous testing, or design changes that justify retesting. Assembly tasks investigated are performed using procedures developed by the flight hardware providers and the Mission Operations Directorate (MOD). Orbital Replacement Unit (ORU) maintenance tasks are performed using a more systematic set of procedures, EVA Concept of Operations for the International Space Station (JSC-33408), also developed by the MOD. This paper describes the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated.

  7. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  8. Overview of Microbiological Tests Performed During the Design of the International Space Station Environmental Control and Life Support Systems

    Science.gov (United States)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    The design and manufacturing of the main Environmental Control and Life Support Systems (ECLSS) for the United States segments of the International Space Station (ISS) was an involved process that started in the late 1980's, with the assessment and testing of competing technologies that could be used to clean the air and recycle water. It culminated in 2009 with the delivery and successful activation of the Water Recovery System (WRS) water processor (WP). The ECLSS required the work of a team of engineers and scientist working together to develop systems that could clean and/or recycle human metabolic loads to maintain a clean atmosphere and provide the crew clean water. One of the main goals of the ECLSS is to minimize the time spent by the crew worrying about vital resources not available in the vacuum of space, which allows them to spend most of their time learning to live in a microgravity environment many miles from the comforts of Earth and working on science experiments. Microorganisms are a significant part of the human body as well as part of the environment that we live in. Therefore, the ISS ECLSS design had to take into account the effect microorganisms have on the quality of stored water and wastewater, as well as that of the air systems. Hardware performance issues impacted by the accumulation of biofilm and/or microbiologically influenced corrosion were also studied during the ECLSS development stages. Many of the tests that were performed had to take into account the unique aspects of a microgravity environment as well as the challenge of understanding how to design systems that could not be sterilized or maintained in a sterile state. This paper will summarize the work of several studies that were performed to assess the impacts and/or to minimize the effects of microorganisms in the design of a closed loop life support system.

  9. Mobile Router Developed and Tested

    Science.gov (United States)

    Ivancic, William D.

    2002-01-01

    The NASA Glenn Research Center, under a NASA Space Act Agreement with Cisco Systems, has been performing joint networking research to apply Internet-based technologies and protocols to space-based communications. As a result of this research, NASA performed stringent performance testing of the mobile router, including the interaction of routing and the transport-level protocol. In addition, Cisco Systems developed the mobile router for both commercial and Government markets. The code has become part of the Cisco Systems Internetworking Operating System (IOS) as of release 12.2 (4) T--which will make this capability available to the community at large. The mobile router is software code that resides in a network router and enables entire networks to roam while maintaining connectivity to the Internet. This router code is pertinent to a myriad of applications for both Government and commercial sectors, including the "wireless battlefield." NASA and the Department of Defense will utilize this technology for near-planetary observation and sensing spacecraft. It is also a key enabling technology for aviation-based information applications. Mobile routing will make it possible for information such as weather, air traffic control, voice, and video to be transmitted to aircraft using Internet-based protocols. This technology shows great promise in reducing congested airways and mitigating aviation disasters due to bad weather. The mobile router can also be incorporated into emergency vehicles (such as ambulances and life-flight aircraft) to provide real-time connectivity back to the hospital and health-care experts, enabling the timely application of emergency care. Commercial applications include entertainment services, Internet protocol (IP) telephone, and Internet connectivity for cruise ships, commercial shipping, tour buses, aircraft, and eventually cars. A mobile router, which is based on mobile IP, allows hosts (mobile nodes) to seamlessly "roam" among various IP

  10. Test-driven development with Django

    CERN Document Server

    Harvey, Kevin

    2015-01-01

    This book is for Django developers with little or no knowledge of test-driven development or testing in general. Familiarity with the command line, setting up a Python virtual environment, and starting a Django project are assumed.

  11. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Temperature and Humidity Control Subsystem

    Science.gov (United States)

    Williams, David E.

    2011-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.

  12. Guideline on in-service testing (IST) of ECCS for nuclear power stations in Japan

    International Nuclear Information System (INIS)

    Yamashita, N.; Honjin, M.; Yamazaki, M.; Iwami, H.

    2001-01-01

    In Japan, METI (Ministry of Economy, Trade and Industry) periodic inspections are conducted every 13 months in accordance with the EUIL (Electric Utility Industry Law) for light water reactors. On the other hand, during operation, many kinds of function tests are conducted in accordance with Technical Specifications or utilities voluntary test procedures. However, these maintenance activities during outages are in other respects considered too costly and more than necessary because of its predetermined maintenance interval and its old-fashioned full scope maintenance menu. In these circumstances, the ASME O and M Codes and Standards, which are applied to nuclear power plants in the United States, came to be one of the issues to be considered among Japanese utilities. This is because the ASME O and M Codes and Standards, which are developed to verify the operational readiness of equipment or systems by condition based maintenance or performance testing without overhauls, will be considered to suggest a rational alternative to our existing maintenance activities. Because there had been no standard for function tests other than the METI inspection procedures in Japan, activities started for the development of Japanese Operation and Maintenance Guideline (hereinafter called the Japanese OM Guideline or the Guideline) for function tests and condition monitoring. The Japanese OM Guideline is not proclaimed for regulatory use, but the long-term objective is to provide a substantial basis to change the current maintenance activities including regulatory inspection. The Guideline is composed of five parts, which are general requirements, pumps, valves, snubbers and ECCS systems. This paper gives a summary of the ECCS part of the Japanese OM Guideline, in particular, focusing on the differences between the Guideline and the ASME O and M Standards, and topics or discussion during their establishment. (author)

  13. Concept definition for space station technology development experiments. Experiment definition, task 2

    Science.gov (United States)

    1986-01-01

    The second task of a study with the overall objective of providing a conceptual definition of the Technology Development Mission Experiments proposed by LaRC on space station is discussed. During this task, the information (goals, objectives, and experiment functional description) assembled on a previous task was translated into the actual experiment definition. Although still of a preliminary nature, aspects such as: environment, sensors, data acquisition, communications, handling, control telemetry requirements, crew activities, etc., were addressed. Sketches, diagrams, block diagrams, and timeline analyses of crew activities are included where appropriate.

  14. Trend on research and development of maintenance robot for nuclear power station

    International Nuclear Information System (INIS)

    Hamada, Shoichi

    1990-01-01

    The expectations for nuclear power supply will increase more and more in future. In the field of maintenance, a robot was introduced in the early stages effecting the decrease of personal exposure, shortening of plantoutage, etc., which has significantly contributed to the stable power generation by nuclear power stations. Recently, a robot is expected to handle new applications for man-like maintenance work, too. The research and development for realization of robots having high-grade specified functions or multi-purpose is now being proceeded. This paper presents the recent situation of robots and the tendency of studies on advanced basic technology of robotics. (author)

  15. Astrobee: Developing a Free Flying Robot for the International Space Station

    Science.gov (United States)

    Bualat, Maria; Barlow, Jonathan; Fong, Terrence; Provencher, Christopher; Smith, Trey; Zuniga, Allison

    2015-01-01

    Astronaut time will always be in short supply, consumables (e.g., oxygen) will always be limited, and some work will not be feasible, or productive, for astronauts to do manually. Free flyers offer significant potential to perform a great variety of tasks, include routine, repetitive or simple but long-duration work, such as conducting environment surveys, taking sensor readings or monitoring crew activities. The "Astrobee" project is developing a new free flying robot system suitable for performing Intravehicular Activity (IVA) work on the International Space Station (ISS). This paper will describe the Astrobee project objectives, initial design, concept of operations, and key challenges.

  16. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Atmosphere Control and Supply Subsystem

    Science.gov (United States)

    Williams, David E.

    2009-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS ACS subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.

  17. The development of a volatile organics concentrator for use in monitoring Space Station water quality

    Science.gov (United States)

    Bodek, Itamar; Ehntholt, Daniel J.; Stolki, Thomas J.; Valentine, James R.; Trabanino, Rudy; Webb, Johanna V.; Sauer, Richard L.

    1991-01-01

    A breadboard concept of a volatile organics concentrator (VOC) is manufactured and tested for optimized water-quality analysis in a space environment. The VOC system is attached to a gas chromatograph/mass spectrometer to analyze the volatile chemicals relevant to the operation of Space Station Freedom. The preliminary tests include: (1) comparisons with analyses based on direct on-column injections of standards; (2) analyses of iodinated volatile organics; (3) comparisons of nitrogen vs helium as the chromatography carrier gas; and (4) measurements of collection efficiency. The VOC can analyze EPA method-624 analytes at comparable detection using flame-ionization detection and can analyze volatile iodinated compounds. The breadboard has good reproducibility and can use nitrogen as a carrier gas; good results are noted for the collection and concentration levels and for water removal.

  18. A shuttle and space station manipulator system for assembly, docking, maintenance, cargo handling and spacecraft retrieval (preliminary design). Volume 3: Concept analysis. Part 2: Development program

    Science.gov (United States)

    1972-01-01

    A preliminary estimate is presented of the resources required to develop the basic general purpose walking boom manipulator system. It is assumed that the necessary full scale zero g test facilities will be available on a no cost basis. A four year development effort is also assumed and it is phased with an estimated shuttle development program since the shuttle will be developed prior to the space station. Based on delivery of one qualification unit and one flight unit and without including any ground support equipment or flight test support it is estimated (within approximately + or - 25%) that a total of 3551 man months of effort and $17,387,000 are required.

  19. Space Station Engineering and Technology Development. Proceedings of the Panel on Program Performance and Onboard Mission Control

    Science.gov (United States)

    1985-01-01

    An ad-hoc committee was asked to review the following questions relevant to the space station program: (1) onboard maintainability and repair; (2) in-space research and technology program and facility plans; (3) solar thermodynamic research and technology development program planning; (4) program performance (cost estimating, management, and cost avoidance); (5) onboard versus ground-based mission control; and (6) technology development road maps from IOC to the growth station. The objective of these new assignments is to provide NASA with advice on ways and means for improving the content, performance, and/or effectiveness of these elements of the space station program.

  20. Final Bioventing Pilot Test Work Plan for Base Exchange Service Station Underground Storage Tank Area, Vandenberg Air Force Base, California. Part I

    National Research Council Canada - National Science Library

    1992-01-01

    This pilot test work plan presents the scope of an in situ enhanced biological degradation, or "bioventing", pilot test for treatment of gasoline- contaminated soils at the Base Exchange Service Station (BXSS...

  1. Nonpoint Pollution Discharge Permit Testing and Control Strategies at Naval Air Station Whidbey Island.

    Science.gov (United States)

    1991-01-01

    were published in the 16 November 1990 Federal Recister in response to the Water Quality Act of 1987. The existing station permit expires in 1992 and...anaerobic decomposition potential may be of major significance. Biodegradation may not occur, however, if other factors needed for bacterial growth are not... bacterially mediated oxidation of ammonia-nitrogen, these compounds can be toxic to humans or other mammals if present at excessive levels. Sources include

  2. Firmware development for VMM testing

    CERN Document Server

    Amayuelas Fernandez, Alfonso

    2017-01-01

    The collaboration has been carried out within the ATLAS Detector Systems area, in the Electronics Department for the muon spectrometer. This includes the team from the National Technical University of Athens (NTUA). The project involves the firmware development of the FPGAs for the configuration of the readout chip used in the detector (known as VMM). Some changes in the firmware were needed in order to check the configuration was correctly sent and the chip configured. The aim of this report is to describe the project in detail, how it has been developed and which problems have been encountered during the process.

  3. Mollusc reproductive toxicity tests - Development and validation of test guidelines

    DEFF Research Database (Denmark)

    Ducrot, Virginie; Holbech, Henrik; Kinnberg, Karin Lund

    . Draft standard operating procedures (SOPs) have been designed based upon literature and expert knowledge from project partners. Pre-validation studies have been implemented to validate the proposed test conditions and identify issues in performing the SOPs and analyzing test results. Pre-validation work......The Organisation for Economic Cooperation and Development is promoting the development and validation of mollusc toxicity tests within its test guidelines programme, eventually aiming for the standardization of mollusc apical toxicity tests. Through collaborative work between academia, industry...... and stakeholders, this study aims to develop innovative partial life-cycle tests on the reproduction of the freshwater gastropods Potamopyrgus antipodarum and Lymnaea stagnalis, which are relevant candidate species for the standardization of mollusc apical toxicity tests assessing reprotoxic effects of chemicals...

  4. Corrective Action Investigation Plan for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    1999-01-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the CAU 321 Area 22 Weather Station Fuel Storage, CAS 22-99-05 Fuel Storage Area. For purposes of this discussion, this site will be referred to as either CAU 321 or the Fuel Storage Area. The Fuel Storage Area is located in Area 22 of the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles[mi]) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Fuel Storage Area (Figure 1-2) was used to store fuel and other petroleum products necessary for motorized operations at the historic Camp Desert Rock facility which was operational from 1951 to 1958 at the Nevada Test Site, Nevada. The site was dismantled after 1958 (DOE/NV, 1996a)

  5. Recent developments in water quality monitoring for Space Station reclaimed wastewaters

    Science.gov (United States)

    Small, John W.; Verostko, Charles E.; Linton, Arthur T.; Burchett, Ray

    1987-01-01

    This paper discusses the recent developments in water quality monitoring for Space Station reclaimed wastewaters. A preprototype unit that contains an ultraviolet absorbance organic carbon monitor integrated with pH and conductivity sensors is presented. The preprototype has provisions for automated operation and is a reagentless flow-through system without any gas/liquid interfaces. The organic carbon monitor detects by utraviolet absorbance the organic impurities in reclaimed wastewater which may be correlated to the organic carbon content of the water. A comparison of the preprototype organic carbon detection values with actual total organic carbon measurements is presented. The electrolyte double junction concept for the pH sensor and fixed electrodes for both the pH and conductivity sensors are discussed. In addition, the development of a reagentless organic carbon analyzer that incorporates ultraviolet oxidation and infrared detection is presented. Detection sensitivities, hardware development, and operation are included.

  6. Economy and development of heating station enterprises managed by forest owners

    International Nuclear Information System (INIS)

    Tuomi, S.

    1997-01-01

    Private heating enterprises are a new form of heat generation for municipalities in Finland. In this type the entrepreneur acquires the fuel and takes care of the operation and monitoring of the heating station. The recompense is paid on the basis of the heat amount produced to avoid problems related to i.e. the energy content and quality of the fuel. The price of heat is typically bound with that of light fuel oil. Agreements based on the price development of district heat and chips are also used. In 1996 there were 36 such heating enterprises in operation in Finland, their total efficiency being 11.5 MW. The aim of the project is to improve the feasibility of various forms of heating enterprises and to start new heating enterprises. The feasibility is studied both from the viewpoint of the entrepreneur and the municipality. The feasibility is improved by developing production chains of heating enterprises and the operability of the heating stations. Establishment of new heating enterprises is promoted by producing and disseminating information to possible entrepreneurs and municipalities. (orig.)

  7. Economy and development of heating station enterprises managed by forest owners

    International Nuclear Information System (INIS)

    Tuomi, S.

    1998-01-01

    Private heating enterprises are a new form of heat generation for municipalities in Finland. In this type the entrepreneur acquires the fuel and takes care of the heating station. The recompense is paid on the basis of the heat amount produced to avoid problems related to i.a. the energy content and the quality of the fuel. The price of heat is typically bound to the price of the light fuel oil. Agreements based on the price development of district heat and chips are also used. In 1997 there were about 50 such enterprises in operation in Finland. The aim of the project is to improve the feasibility of various forms of heating enterprises and to start new heating enterprises. The feasibility is studied both from the viewpoint of the entrepreneur and the municipality. The feasibility is improved by developing production chains of heating enterprises and the operability of heating stations. Establishment of new heating enterprises is promoted by producing and disseminating information to prospective entrepreneurs and municipalities. (orig.) 2 figs., 2 tabs. Bioenergy Research programme

  8. Land use planning using transit oriented development concept: Case study: Salaya station

    Science.gov (United States)

    Jarritthai, Supanee; Techpeeraparnich, Wasaporn

    2017-10-01

    The urban sprawl of Bangkok has increased with a motorization rate along with the expansion of the road network to adjacent cities. Nakhonpathom province, located at the southern edge of Bangkok has been affected by the urban sprawl. One of Nakhonpathom's Districts named "Salaya" Salaya has been quickly urbanized due to the establishment of many large academic institutes, such as universities, colleges and high schools as well as many commercial shopping malls. The period of 2013-2017, the Thai government introduced sustainable urban planning policy and promoted the use of public transportation systems. The Light Red Line railway extension of the Bangkok Metro Transit system will soon be constructed and the current Salaya Station will be replaced with new station. Many railway expansion projects will be built, should be designed by using transit-oriented development (TOD) scheme. This paper explores demographic information of the area, the demands of the community and relevant stakeholders for designing of the area using TOD. The proposed land use planning is designed based on the existing condition of the area as much as possible to meet the TOD standard and stakeholders' requirement. The result revealed that the guidelines of transit oriented development concept were of importance not only for planning of urban land use, supporting public transport, but also improving the quality of life.

  9. Economy and development of heating station enterprises managed by forest owners; Metsaenomistajien laempoeyrittaemisen talous ja kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Tuomi, S [Work Efficiency Inst., Rajamaeki (Finland)

    1997-12-01

    Private heating enterprises are a new form of heat generation for municipalities in Finland. In this type the entrepreneur acquires the fuel and takes care of the operation and monitoring of the heating station. The recompense is paid on the basis of the heat amount produced to avoid problems related to i.e. the energy content and quality of the fuel. The price of heat is typically bound with that of light fuel oil. Agreements based on the price development of district heat and chips are also used. In 1996 there were 36 such heating enterprises in operation in Finland, their total efficiency being 11.5 MW. The aim of the project is to improve the feasibility of various forms of heating enterprises and to start new heating enterprises. The feasibility is studied both from the viewpoint of the entrepreneur and the municipality. The feasibility is improved by developing production chains of heating enterprises and the operability of the heating stations. Establishment of new heating enterprises is promoted by producing and disseminating information to possible entrepreneurs and municipalities. (orig.)

  10. Economy and development of heating station enterprises managed by forest owners

    International Nuclear Information System (INIS)

    Tuomi, S.

    1998-01-01

    Private heating enterprises are a new form of heat generation for municipalities in Finland. In this type the entrepreneur acquires the fuel and takes care of the operation and monitoring of the heating station. The recompense is paid on the basis of the heat amount produced to avoid problems related to i.a. the energy content and quality of the fuel. The price of heat is typically bound with that of light fuel oil. Agreements based on the price development of district heat and chips are also used. In 1997 there were about 50 such heating enterprises in operation in Finland. The aim of the project is to improve the feasibility of various forms of heating enterprises and to start new heating enterprises. The feasibility is studied both from the viewpoint of the entrepreneur and the municipality. The feasibility is improved by developing production chains of heating enterprises and the operability of heating stations. Establishment of new heating enterprises is promoted by producing and disseminating information to possible entrepreneurs and municipalities. (orig.)

  11. Waste form development/test

    International Nuclear Information System (INIS)

    Kalb, P.D.; Colombo, P.

    1983-01-01

    The main objective of this study is to investigate new solidification agents relative to their potential application to wastes generated by advanced high volume reduction technologies, e.g., incinerator ash, dry solids, and ion exchange resins. Candidate materials selected for the solidification of these wastes include a modified sulfur cement and low-density polyethylene, neither of which are currently employed commerically for the solidification of low-level waste (LLW). As both the modified sulfur cement and the polyethylene are thermoplastic materials, a heated screw type extruder is utilized in the production of waste form samples for testing and evaluation. In this regard, work is being conducted to determine the range of conditions under which these solidification agents can be satisfactorily applied to the specific LLW streams and to provide information relevant to operating parameters and process control

  12. Test-driven development with Mockito

    CERN Document Server

    Acharya, Sujoy

    2013-01-01

    This book is a hands-on guide, full of practical examples to illustrate the concepts of Test Driven Development.If you are a developer who wants to develop software following Test Driven Development using Mockito and leveraging various Mockito features, this book is ideal for you. You don't need prior knowledge of TDD, Mockito, or JUnit.It is ideal for developers, who have some experience in Java application development as well as a basic knowledge of unit testing, but it covers the basic fundamentals of TDD and JUnit testing to get you acquainted with these concepts before delving into them.

  13. Field testing of a 1,300MVA turbine generator for the Oi nuclear-power station

    International Nuclear Information System (INIS)

    Inoue, Toshiaki; Tajiri, Yoshiaki; Ito, Hiroyuki; Fukuda, Mitsuo.

    1980-01-01

    The first Mitsubishi 1,300MVA turbine generator for this power station was put into commercial operation in March 1979, and the second unit in December of that year. The turbine generators use new technology in a variety of areas, including the cooling system, to achieve great increases in capacity over previously designed generators, and are destined to become the worldwide standard for large-scale generators of this type. Valuable experience was gained in the installation and testing of the generators. The outline of the tests performed on the generators with respect to heating and vibration are described in the article. (author)

  14. A 6 kW at 4.5 K helium refrigerator for CERN's Cryogenic Test Station

    International Nuclear Information System (INIS)

    Gistau, G.M.; Bonneton, M.

    1994-01-01

    For purposes of testing the present LEP superconducting resonant cavities and the future LHC magnets, CERN built a test station the cryogenic power of which is presently supplied by a dedicated 6 kW at 4.5 K helium refrigerator. The thermodynamic cycle is discussed and special emphasis is put on a new cryogenic expansion turbine operating in the liquid phase. Information is given about: the cycle screw compressors' performances, the general performance of the refrigerator, the expected efficiency enhancement due to the liquid turbine, an off-design turn down operation

  15. MacDUST - a powder diffraction package developed for the ''ADONE'' high resolution diffraction station

    International Nuclear Information System (INIS)

    Burattini, E.; Cappuccio, G.; Maistrelli, P.; Simeoni, S.

    1993-01-01

    A High Resolution Powder Diffraction Station (PO.DI.STA.) was installed at the beginning of 1991 on the ADONE-Wiggler magnet beam line. The station and the first powder diffraction spectra, collected with synchrotron radiation, were presented at the EPDIC-1 Conference. More details can also be found in. For this station, a very sophisticated software package ''MacDUST'' has been developed on an Apple Macintosh computer, using the Microsoft QuickBASIC compiler. It allows very easy and comfortable operations by means of a graphical user interface environment, typical of the Macintosh system. The package consists of five major programs. The main program, MacDIFF, performs all the graphic operations on the experimental data, including zooming, overlapping, cursor scanning and editing of patterns, control of output operations to printers and HPGL plotters. It also includes several analysis routines for data smoothing, a first derivative peak search algorithm, two background subtraction routines and two profile fitting programs: one based on the simplex method and the other on the Marquardt modification of a least-square algorithm. MacPDF and MacRIC are both dedicated to phase identification. The first program is an archive manager for searching, displaying and printing phase records; MacRIC is a graphic aided search-match program based on the Hanawalt algorithm. Mac3-DIM is a plot program, useful, e.g., for representing kinetics three dimensionally. MacRIET is a Macintosh version of the well known Rietveld refinement program. This version, besides conventional structure refinements, also allows the determination of micro structural parameters, i.e. micro strain and crystallite size. The program can also be used to simulate a pattern, once the structure of the compound is known. Taking advantage of the very intuitive Macintosh graphic user interface, through dialog and alert boxes, the program allows straightforward introduction and modification of the structure

  16. Development of a Computerized Visual Search Test

    Science.gov (United States)

    Reid, Denise; Babani, Harsha; Jon, Eugenia

    2009-01-01

    Visual attention and visual search are the features of visual perception, essential for attending and scanning one's environment while engaging in daily occupations. This study describes the development of a novel web-based test of visual search. The development information including the format of the test will be described. The test was designed…

  17. Technology, safety and costs of decommissioning a reference boiling water reactor power station: Comparison of two decommissioning cost estimates developed for the same commercial nuclear reactor power station

    International Nuclear Information System (INIS)

    Konzek, G.J.; Smith, R.I.

    1990-12-01

    This study presents the results of a comparison of a previous decommissioning cost study by Pacific Northwest Laboratory (PNL) and a recent decommissioning cost study of TLG Engineering, Inc., for the same commercial nuclear power reactor station. The purpose of this comparative analysis on the same plant is to determine the reasons why subsequent estimates for similar plants by others were significantly higher in cost and external occupational radiation exposure (ORE) than the PNL study. The primary purpose of the original study by PNL (NUREG/CR-0672) was to provide information on the available technology, the safety considerations, and the probable costs and ORE for the decommissioning of a large boiling water reactor (BWR) power station at the end of its operating life. This information was intended for use as background data and bases in the modification of existing regulations and in the development of new regulations pertaining to decommissioning activities. It was also intended for use by utilities in planning for the decommissioning of their nuclear power stations. The TLG study, initiated in 1987 and completed in 1989, was for the same plant, Washington Public Supply System's Unit 2 (WNP-2), that PNL used as its reference plant in its 1980 decommissioning study. Areas of agreement and disagreement are identified, and reasons for the areas of disagreement are discussed. 31 refs., 3 figs., 22 tabs

  18. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    Energy Technology Data Exchange (ETDEWEB)

    Charcharos, A N; Jones, A G [National Nuclear Corp. Ltd., Cheshire (United Kingdom)

    1984-07-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  19. A survey of the development of Nuclear Power Stations in Asia

    International Nuclear Information System (INIS)

    Javan, A.

    2000-01-01

    Thanks to its direct correlation with economic development, the power industry has got a boost in the Asian countries. The development of the power industry in Asia hinges predominantly on the construction of nuclear power stations. The capacity of nuclear plants is expected to reach to 51-67 gigawatts in 2010, compared with 22.5 gigawatts in 1999. As the nuclear technology is supplied by the Western economies especially the US, Canada and France, the construction of new nuclear plants would make the Asian states even more dependant on the Western nations. It seems the willingness of the western countries in providing nuclear power technology to the Asian states, among other factors stems from their ambition of controlling price and supply of oil and gas in the region. This is actually a threat to the fossil fuel holders

  20. Technology development activities for housing research animals on Space Station Freedom

    Science.gov (United States)

    Jenner, Jeffrey W.; Garin, Vladimir M.; Nguyen, Frank D.

    1991-01-01

    The development and design of animal facilities are described in terms of the technological needs for NASA's Biological Flight Research Laboratory. Animal habitats are presented with illustrations which encompass waste-collection techniques for microgravity conditions that reduce the need for crew participation. The technology is intended to be highly compatible with animal morphology, and airflow is employed as the primary mechanism of waste control. The airflow can be utilized in the form of localized high-speed directed flow that simultaneously provides a clean animal habitat and low airflow rates. The design of an animal-habitat testbed is presented which capitalizes on contamination-control mechanisms and suitable materials for microgravity conditions. The developments in materials and technologies represent significant contributions for the design of the centrifuge facilities for the Space Station Freedom.

  1. Development of a System to Assess Biofilm Formation in the International Space Station

    Science.gov (United States)

    Martin Charles, E.; Summers, Silvia M.; Roman, Monserrate C.

    1998-01-01

    The design requirements for the water treatment systems aboard the International Space Station (ISS) include and require recycling as much water as possible and to treat the water for intentional contamination (hygiene, urine distillate, condensate, etc.) and unintentional contamination in the form of biofilm and microorganisms. As part of an effort to address the latter issue, a biofilm system was developed by Marshall Space Flight Center (MSFC) to simulate the conditions aboard ISS with respect to materials, flow rates, water conditions, water content, and handling. The tubing, connectors, sensors, and fabricated parts included in the system were chosen for specific attributes as applicable to emulate an orbital water treatment system. This paper addresses the design and development process of the system, as well as the configuration, operation, and system procedures for maintenance to assure that the simulation is valid for the representative data as it applies to water degradation and biofilm/microbial growth. Preliminary biofilm/microbial results are also presented.

  2. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    International Nuclear Information System (INIS)

    Charcharos, A.N.; Jones, A.G.

    1984-01-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  3. Real-time graphics for the Space Station Freedom cupola, developed in the Systems Engineering Simulator

    Science.gov (United States)

    Red, Michael T.; Hess, Philip W.

    1989-01-01

    Among the Lyndon B. Johnson Space Center's responsibilities for Space Station Freedom is the cupola. Attached to the resource node, the cupola is a windowed structure that will serve as the space station's secondary control center. From the cupola, operations involving the mobile service center and orbital maneuvering vehicle will be conducted. The Systems Engineering Simulator (SES), located in building 16, activated a real-time man-in-the-loop cupola simulator in November 1987. The SES cupola is an engineering tool with the flexibility to evolve in both hardware and software as the final cupola design matures. Two workstations are simulated with closed-circuit television monitors, rotational and translational hand controllers, programmable display pushbuttons, and graphics display with trackball and keyboard. The displays and controls of the SES cupola are driven by a Silicon Graphics Integrated Raster Imaging System (IRIS) 4D/70 GT computer. Through the use of an interactive display builder program, SES, cupola display pages consisting of two dimensional and three dimensional graphics are constructed. These display pages interact with the SES via the IRIS real-time graphics interface. The focus is on the real-time graphics interface applications software developed on the IRIS.

  4. Development and calibration of an accurate 6-degree-of-freedom measurement system with total station

    International Nuclear Information System (INIS)

    Gao, Yang; Lin, Jiarui; Yang, Linghui; Zhu, Jigui

    2016-01-01

    To meet the demand of high-accuracy, long-range and portable use in large-scale metrology for pose measurement, this paper develops a 6-degree-of-freedom (6-DOF) measurement system based on total station by utilizing its advantages of long range and relative high accuracy. The cooperative target sensor, which is mainly composed of a pinhole prism, an industrial lens, a camera and a biaxial inclinometer, is designed to be portable in use. Subsequently, a precise mathematical model is proposed from the input variables observed by total station, imaging system and inclinometer to the output six pose variables. The model must be calibrated in two levels: the intrinsic parameters of imaging system, and the rotation matrix between coordinate systems of the camera and the inclinometer. Then corresponding approaches are presented. For the first level, we introduce a precise two-axis rotary table as a calibration reference. And for the second level, we propose a calibration method by varying the pose of a rigid body with the target sensor and a reference prism on it. Finally, through simulations and various experiments, the feasibilities of the measurement model and calibration methods are validated, and the measurement accuracy of the system is evaluated. (paper)

  5. Test Marketing in New Product Development

    Science.gov (United States)

    Klompmaker, Jay E.; And Others

    1976-01-01

    Discusses the role of test marketing in new product development, based on interviews with marketing executives. Attempts to clarify when a test market should be done, what its aims should be, and how it should be used. (JG)

  6. International Space Station Sustaining Engineering: A Ground-Based Test Bed for Evaluating Integrated Environmental Control and Life Support System and Internal Thermal Control System Flight Performance

    Science.gov (United States)

    Ray, Charles D.; Perry, Jay L.; Callahan, David M.

    2000-01-01

    As the International Space Station's (ISS) various habitable modules are placed in service on orbit, the need to provide for sustaining engineering becomes increasingly important to ensure the proper function of critical onboard systems. Chief among these are the Environmental Control and Life Support System (ECLSS) and the Internal Thermal Control System (ITCS). Without either, life onboard the ISS would prove difficult or nearly impossible. For this reason, a ground-based ECLSS/ITCS hardware performance simulation capability has been developed at NASA's Marshall Space Flight Center. The ECLSS/ITCS Sustaining Engineering Test Bed will be used to assist the ISS Program in resolving hardware anomalies and performing periodic performance assessments. The ISS flight configuration being simulated by the test bed is described as well as ongoing activities related to its preparation for supporting ISS Mission 5A. Growth options for the test facility are presented whereby the current facility may be upgraded to enhance its capability for supporting future station operation well beyond Mission 5A. Test bed capabilities for demonstrating technology improvements of ECLSS hardware are also described.

  7. European wind turbine testing procedure developments. Task 2: Power quality

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Friis Pedersen, Troels; Gerdes, G.

    2001-01-01

    The present report describes the work done in the power quality subtask of the European Wind Turbine Testing Procedure Developments project funded by the EU SMT program. The objective of the power quality subtask has been to make recommendations andprovide background for new standards...... for measurement and testing of wind turbine power quality. The focus in the work has been to support the ongoing standardisation work in IEC with a new standard IEC61400-21 for measurement and assessment of powerquality characteristics of grid connected wind turbines. The work has also been based on the power...... quality measuremnet procedure in the Measnet cooperation of European test stations for wind turbines. The first working item of the project has been toverify the state of the art of the measurement procedures by analyses and comparisons of the measurements and data processing software of the participating...

  8. Geochemical Testing And Model Development - Residual Tank Waste Test Plan

    International Nuclear Information System (INIS)

    Cantrell, K.J.; Connelly, M.P.

    2010-01-01

    This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

  9. Testing Infrastructure for Operating System Kernel Development

    DEFF Research Database (Denmark)

    Walter, Maxwell; Karlsson, Sven

    2014-01-01

    Testing is an important part of system development, and to test effectively we require knowledge of the internal state of the system under test. Testing an operating system kernel is a challenge as it is the operating system that typically provides access to this internal state information. Multi......-core kernels pose an even greater challenge due to concurrency and their shared kernel state. In this paper, we present a testing framework that addresses these challenges by running the operating system in a virtual machine, and using virtual machine introspection to both communicate with the kernel...... and obtain information about the system. We have also developed an in-kernel testing API that we can use to develop a suite of unit tests in the kernel. We are using our framework for for the development of our own multi-core research kernel....

  10. Guidelines for Learning Stations.

    Science.gov (United States)

    Fehrle, Carl C.; Schulz, Jolene

    Guidelines for designing and planning learning stations for pupils at the elementary grade level include suggestions on how to develop a station that will be successful in meeting the learners' needs. Instructions for the use of tapes at a station and matching pupils with stations are given, as are guidelines on classroom arrangement and record…

  11. A Decade of Life Sciences Experiment Unique Equipment Development for Spacelab and Space Station, 1990-1999

    Science.gov (United States)

    Savage, Paul D.; Connolly, J. P.; Navarro, B. J.

    1999-01-01

    Ames Research Center's Life Sciences Division has developed and flown an extensive array of spaceflight experiment unique equipment (EUE) during the last decade of the twentieth century. Over this ten year span, the EUE developed at ARC supported a vital gravitational biology flight research program executed on several different platforms, including the Space Shuttle, Spacelab, and Space Station Mir. This paper highlights some of the key EUE elements developed at ARC and flown during the period 1990-1999. Resulting lessons learned will be presented that can be applied to the development of similar equipment for the International Space Station.

  12. TNB Experience in Developing Solar Hybrid Station at RPS Kemar, Gerik, Perak Darul Ridzuan

    International Nuclear Information System (INIS)

    Aziz, K A; Shamsudin, K N

    2013-01-01

    This paper will discuss on TNB experience in developing Solar Hybrid Station at RPS Kemar, Gerik, Perak. TNB has been approached by KKLW to submit proposal to provide electricity in the rural area namely RPS Kemar. Looking at area and source available, Solar Hybrid System was the best method in order to provide electricity at this area. This area is far from national grid sources. Solar Hybrid System is the best method to produce electrical power using the renewable energy from Solar PV, Battery and Diesel Generator Set. Nowadays, price of petroleum is slightly high due to higher demand from industry. Solar energy is good alternative in this country to practice in order to reduce cost for produce of electrical energy. Generally, Solar will produce energy during daytime and when become cloudy and dark, automatically battery and diesel generator set will recover the system through the hybrid controller system.

  13. Development of an acoustic emission equipment for valves of the Nuclear Power Station Atucha 1

    International Nuclear Information System (INIS)

    Giaccheta, R.; Lopez Pumarega, I.; Straus, A.; Ruzzante, J.; Herzovich, P.

    1994-01-01

    A four channel Acoustic Emission was developed by the Acoustic Emission Group, INEND Department, of the Atomic Energy Commission of Argentina, for the detection of leaks in valves of the pressurized air system: ''Sistema de desconexion de emergencias por acido deuteroborico''. Basically, the system consists of four piezoelectric transducers with their corresponding preamplifiers coupled to the piping close to the valves. The following stages: amplifiers, threshold levels, channel identifications and visual alarm system are gathered in a box. The system was installed in the controlled zone of the Nuclear Power Stations Atucha I. It was calibrated and works on line. The values shown on the display are registered daily in order to separate the normal values from the leak ones. (author). 4 refs, 9 figs

  14. Low-cost extrapolation method for maximal LTE radio base station exposure estimation: test and validation.

    Science.gov (United States)

    Verloock, Leen; Joseph, Wout; Gati, Azeddine; Varsier, Nadège; Flach, Björn; Wiart, Joe; Martens, Luc

    2013-06-01

    An experimental validation of a low-cost method for extrapolation and estimation of the maximal electromagnetic-field exposure from long-term evolution (LTE) radio base station installations are presented. No knowledge on downlink band occupation or service characteristics is required for the low-cost method. The method is applicable in situ. It only requires a basic spectrum analyser with appropriate field probes without the need of expensive dedicated LTE decoders. The method is validated both in laboratory and in situ, for a single-input single-output antenna LTE system and a 2×2 multiple-input multiple-output system, with low deviations in comparison with signals measured using dedicated LTE decoders.

  15. Low-cost extrapolation method for maximal lte radio base station exposure estimation: Test and validation

    International Nuclear Information System (INIS)

    Verloock, L.; Joseph, W.; Gati, A.; Varsier, N.; Flach, B.; Wiart, J.; Martens, L.

    2013-01-01

    An experimental validation of a low-cost method for extrapolation and estimation of the maximal electromagnetic-field exposure from long-term evolution (LTE) radio base station installations are presented. No knowledge on down-link band occupation or service characteristics is required for the low-cost method. The method is applicable in situ. It only requires a basic spectrum analyser with appropriate field probes without the need of expensive dedicated LTE decoders. The method is validated both in laboratory and in situ, for a single-input single-output antenna LTE system and a 2x2 multiple-input multiple-output system, with low deviations in comparison with signals measured using dedicated LTE decoders. (authors)

  16. Development of ICT for Leaching Monitoring in Taiwan Agricultural LTER Stations

    Directory of Open Access Journals (Sweden)

    Yankuang Chan

    2017-06-01

    Full Text Available In order to study the groundwater subsidy from different cropping systems, leaching monitoring in Taiwan started in 2008 and implemented agricultural long-term ecological research (LTER stations. Initially, leaching data was received by lysimeters, and then collected manually by laborers in the field twice per month. The cost of data collection and transmission is high, real-time monitoring is not possible, and maintenance of instruments is inefficient. In this study, the goal is to develop a data transmission path. ICT (Information and Communication Technology with different data transmission schemes was applied to improve the efficiency and immediacy of data transfer from the field to the databases in labs. Between 2010 and 2017, four versions of ICT have been developed and applied in LTER stations. WiFi, 2.5G (General Packet Radio Service, GPRS, 3G/4G network transmission, and Arduino cores are applied in different ICT versions. The first version of data transmission used data loggers, developed by the original factory, with a lower cost of renovation of instruments. However, complicated transmission paths, diverse instruments, poor weather resistance, and lack of wireless functionality are the limitations of the first version. Those limitations had been overcome by the second and third versions by using 2.5G (GPRS and 3G/4G network transmission, respectively. Nevertheless, these versions are limited to the processes of data compression and encryption transmission which were developed by the system vendors. In addition, data can only be collected through the webpage provided by the vendors, instead of being received directly from the database using SQL (Structured Query Language. This is inappropriate for advanced data treatment, organization, and analysis. Finally, the fourth version of data transmission has been developed using Arduino. This system allows redesigning of the data loggers and transmission instrument with more feasibility and

  17. Ubiquitous Total Station Development using Smartphone, RSSI and Laser Sensor providing service to Ubi-GIS

    Directory of Open Access Journals (Sweden)

    M. A. Shoushtari

    2014-10-01

    Full Text Available The growing trend in technological advances and Micro Electro Mechanical Systems (MEMS has targeted for intelligent human lives. Accordingly, Ubiquitous Computing Approach was proposed by Mark Weiser. This paper proposes an ubiquitous surveying solution in Geometrics and surveying field. Ubiquitous Surveying provides cost-effective, smart and available surveying techniques while traditional surveying equipment are so expensive and have small availability specially in indoor and daily surveying jobs. In order to have a smart surveying instrument, different information technology methods and tools like Triangle method, Received Signal Strength Indicator (RSSI method and laser sensor are used. These new ways in combine with surveying equations introduces a modern surveying equipment called Ubi-Total Station that also employed different sensors embedded in smartphone and mobile stand. RSSI-based localization and Triangle method technique are easy and well known methods to predict the position of an unknown node in indoor environments whereas additional measures are required for a sufficient accuracy. In this paper the main goal is to introduce the Ubiquitous Total Station as a development in smart and ubiquitous GIS. In order to public use of the surveying equipment, design and implementation of this instrument has been done. Conceptual model of Smartphone-based system is designed for this study and based on this model, an Android application as a first sample is developed. Finally the evaluations shows that absolute errors in X and Y calculation are 0.028 and 0.057 meter respectively. Also RMSE of 0.26 was calculated in RSSI method for distance measurement. The high price of traditional equipment and their requirement for professional surveyors has given way to intelligent surveying. In the suggested system, smartphones can be used as tools for positioning and coordinating geometric information of objects.

  18. AngularJS test-driven development

    CERN Document Server

    Chaplin, Tim

    2015-01-01

    This book is for developers who want to learn about AngularJS development by applying testing techniques. You are assumed to have a basic knowledge and understanding of HTML, JavaScript, and AngularJS.

  19. Test Driven Development of Scientific Models

    Science.gov (United States)

    Clune, Thomas L.

    2014-01-01

    Test-Driven Development (TDD), a software development process that promises many advantages for developer productivity and software reliability, has become widely accepted among professional software engineers. As the name suggests, TDD practitioners alternate between writing short automated tests and producing code that passes those tests. Although this overly simplified description will undoubtedly sound prohibitively burdensome to many uninitiated developers, the advent of powerful unit-testing frameworks greatly reduces the effort required to produce and routinely execute suites of tests. By testimony, many developers find TDD to be addicting after only a few days of exposure, and find it unthinkable to return to previous practices.After a brief overview of the TDD process and my experience in applying the methodology for development activities at Goddard, I will delve more deeply into some of the challenges that are posed by numerical and scientific software as well as tools and implementation approaches that should address those challenges.

  20. Summary of in-situ tests of filter systems in nuclear power stations

    International Nuclear Information System (INIS)

    Hesboel, R.; Persson, M.

    1980-04-01

    Iodine filter installations at nuclear power plants are systematically tested regarding light assembly and retention of iodine. Studsvik Energiteknik AB has collected a sizeable amount of test data over the years. The filter installations and test methods are described, followed by an analysis of test results and experience over the past 10 years. As a rule in-situ tests have been carried out at low relative humidity, in 90% of them below 50% relative humidity. Variations in flow have been larger than expected, and the variations in operative conditions affect test results. The test method is, however, regarded acceptable for off-gas filter systems. Additional test methods are required for the auxiliary and energency systems. (G.B.)

  1. Development and construction of nuclear power and nuclear heating stations in the USSR

    International Nuclear Information System (INIS)

    Schmidt, G.; Kirmse, B.

    1983-01-01

    The state-of-the-art of nuclear power technology in the USSR is reviewed by presenting characteristic data on design and construction. The review takes into consideration the following types of facilities: Nuclear power stations with 1000 MWe pressurized water reactors, with 1000 MWe pressure tube boiling water reactors, and with 600 MWe fast breeder reactors; nuclear heating power stations with 1000 MWe reactors and nuclear heating stations with 500 MWth boiling water reactors

  2. The Climate Hazards group InfraRed Precipitation (CHIRP) with Stations (CHIRPS): Development and Validation

    Science.gov (United States)

    Peterson, P.; Funk, C. C.; Husak, G. J.; Pedreros, D. H.; Landsfeld, M.; Verdin, J. P.; Shukla, S.

    2013-12-01

    CHIRP and CHIRPS are new quasi-global precipitation products with daily to seasonal time scales, a 0.05° resolution, and a 1981 to near real-time period of record. Developed by the Climate Hazards Group at UCSB and scientists at the U.S. Geological Survey Earth Resources Observation and Science Center specifically for drought early warning and environmental monitoring, CHIRPS provides moderate latency precipitation estimates that place observed hydrologic extremes in their historic context. Three main types of information are used in the CHIRPS: (1) global 0.05° precipitation climatologies, (2) time-varying grids of satellite-based precipitation estimates, and (3) in situ precipitation observations. CHIRP: The global grids of long-term (1980-2009) average precipitation were estimated for each month based on station data, averaged satellite observations, and physiographic parameters. 1981-present time-varying grids of satellite precipitation were derived from spatially varying regression models based on pentadal cold cloud duration (CCD) values and TRMM V7 training data. The CCD time-series were derived from the CPC and NOAA B1 datasets. Pentadal CCD-percent anomaly values were multiplied by pentadal climatology fields to produce low bias pentadal precipitation estimates. CHIRPS: The CHG station blending procedure uses the satellite-observed spatial covariance structure to assign relative weights to neighboring stations and the CHIRP values. The CHIRPS blending procedure is based on the expected correlation between precipitation at a given target location and precipitation at the locations of the neighboring observation stations. These correlations are estimated using the CHIRP fields. The CHG has developed an extensive archive of in situ daily, pentadal and monthly precipitation totals. The CHG database has over half a billion daily rainfall observations since 1980 and another half billion before 1980. Most of these observations come from four sets of global

  3. Pilot tests for dismantling by blasting of the biological shield of a shut down nuclear power station

    International Nuclear Information System (INIS)

    Freund, H.U.

    1995-01-01

    Following free-field tests on concrete blocks the feasibility of explosive dismantling of the biological shield of nuclear power stations has been succesfully tested at the former hotsteam reaction in Karlstein/Main Germany. For this purpose a model shield of scale 1:2 was embedded into the reactor structure at which bore-hole blasting tests employing up to about 15 kg of explosive were performed. An elaborate measurement system allowed to receive detailed information on the blast side-effects: Special emphasis was focussed on the quantitative registration of the dynamic blast loads; data for the transfer of the dismantling method to the removal of real ractor structures were obtained. (orig.) [de

  4. Simulation of the transient behaviour of the Mulheim-Karlich nuclear power station and comparison with startup tests

    International Nuclear Information System (INIS)

    Burchhardt, W.; Weber, J.P.

    1987-01-01

    Among the startup tests of the Mulheim-Karlich nuclear power station an anticipated turbine trip and a rector trip have been performed. Calculations have been done for both tests by the authors using the computer codes DYNODE-P and ALMOD4. At a given reactor power the transient behavior of the plant is determined by the heat load of the once-through steam generators (OTSG), which in turn is governed by the integral control system. As expected the behavior of the plant after the trips can be exactly reproduced only if the bypass control system is completely modelled. In addition the heat transfer to the secondary side of the OTSG which governs the steam production has to be calculated close to reality. comparing the calculated results with the measured test data it is demonstrated that either code can be used to reproduce the transient behavior of the plant

  5. The role of a certified calibration laboratory in a station's measuring and test equipment calibration, repair, and documentation program

    International Nuclear Information System (INIS)

    Ebenstreit, K.; MacIntosh, N.

    1995-01-01

    This paper outlines the role of a Certified Calibration Laboratory in- ensuring that the requirements of Measuring and Test Equipment calibration, identification, and traceability are met and documented. The Nuclear environment is one which is subject to influences from numerous 'quality agents'. One of the fields which comes under the scrutiny of the quality agents is that of equipment calibration and repair (both field components and M and TE). There is a responsibility to produce a superior product for the Ontario Consumer. The maintenance and calibration of Station Systems and their components have a direct impact on this output. The Measuring and Test Equipment element in each of these needs can be addressed by having a defined group of Maintenance Staff to execute a Measuring and Test Equipment Program which meets specific parameters. (author)

  6. Development and Validation of a Translation Test.

    Science.gov (United States)

    Ghonsooly, Behzad

    1993-01-01

    Translation testing methodology has been criticized for its subjective character. No real strides have so far been made in developing an objective translation test. In this paper, certain detailed procedures including various phases of pretesting have been performed to achieve objectivity and scorability in translation testing methodology. In…

  7. Ion Exchange Technology Development in Support of the Urine Processor Assembly Precipitation Prevention Project for the International Space Station

    Science.gov (United States)

    Mitchell, Julie L.; Broyan, James L.; Pickering, Karen D.; Adam, Niklas; Casteel, Michael; Callahan, Michael; Carrier, Chris

    2012-01-01

    In support of the Urine Processor Assembly Precipitation Prevention Project (UPA PPP), multiple technologies were explored to prevent CaSO4 2H2O (gypsum) precipitation during the on-orbit distillation process. Gypsum precipitation currently limits the water recovery rate onboard the International Space Station (ISS) to 70% versus the planned 85% target water recovery rate. Due to its ability to remove calcium cations in pretreated augmented urine (PTAU), ion exchange was selected as one of the technologies for further development by the PPP team. A total of 13 ion exchange resins were evaluated in various equilibrium and dynamic column tests with solutions of dissolved gypsum, urine ersatz, PTAU, and PTAU brine at 85% water recovery. While initial evaluations indicated that the Purolite SST60 resin had the highest calcium capacity in PTAU (0.30 meq/mL average), later tests showed that the Dowex G26 and Amberlite FPC12H resins had the highest capacity (0.5 meq/mL average). Testing at the Marshall Spaceflight Center (MSFC) integrates the ion exchange technology with a UPA ground article under flight-like pulsed flow conditions with PTAU. To date, no gypsum precipitation has taken place in any of the initial evaluations.

  8. Methodology for developing new test methods

    Directory of Open Access Journals (Sweden)

    A. I. Korobko

    2017-06-01

    Full Text Available The paper describes the methodology for developing new test methods and forming solutions for the development of new test methods. The basis of the methodology for developing new test methods is the individual elements of the system and process approaches. They contribute to the development of an effective research strategy for the object, the study of interrelations, the synthesis of an adequate model of the test method. The effectiveness of the developed test method is determined by the correct choice of the set of concepts, their interrelations and mutual influence. This allows you to solve the tasks assigned to achieve the goal. The methodology is based on the use of fuzzy cognitive maps. The question of the choice of the method on the basis of which the model for the formation of solutions is based is considered. The methodology provides for recording a model for a new test method in the form of a finite set of objects. These objects are significant for the test method characteristics. Then a causal relationship is established between the objects. Further, the values of fitness indicators and the observability of the method and metrological tolerance for the indicator are established. The work is aimed at the overall goal of ensuring the quality of tests by improving the methodology for developing the test method.

  9. Test Driven Development of Scientific Models

    Science.gov (United States)

    Clune, Thomas L.

    2012-01-01

    Test-Driven Development (TDD) is a software development process that promises many advantages for developer productivity and has become widely accepted among professional software engineers. As the name suggests, TDD practitioners alternate between writing short automated tests and producing code that passes those tests. Although this overly simplified description will undoubtedly sound prohibitively burdensome to many uninitiated developers, the advent of powerful unit-testing frameworks greatly reduces the effort required to produce and routinely execute suites of tests. By testimony, many developers find TDD to be addicting after only a few days of exposure, and find it unthinkable to return to previous practices. Of course, scientific/technical software differs from other software categories in a number of important respects, but I nonetheless believe that TDD is quite applicable to the development of such software and has the potential to significantly improve programmer productivity and code quality within the scientific community. After a detailed introduction to TDD, I will present the experience within the Software Systems Support Office (SSSO) in applying the technique to various scientific applications. This discussion will emphasize the various direct and indirect benefits as well as some of the difficulties and limitations of the methodology. I will conclude with a brief description of pFUnit, a unit testing framework I co-developed to support test-driven development of parallel Fortran applications.

  10. Development and Initial Testing of the Tiltrotor Test Rig

    Science.gov (United States)

    Acree, C. W., Jr.; Sheikman, A. L.

    2018-01-01

    The NASA Tiltrotor Test Rig (TTR) is a new, large-scale proprotor test system, developed jointly with the U.S. Army and Air Force, to develop a new, large-scale proprotor test system for the National Full-Scale Aerodynamics Complex (NFAC). The TTR is designed to test advanced proprotors up to 26 feet in diameter at speeds up to 300 knots, and even larger rotors at lower airspeeds. This combination of size and speed is unprecedented and is necessary for research into 21st-century tiltrotors and other advanced rotorcraft concepts. The TTR will provide critical data for validation of state-of-the-art design and analysis tools.

  11. Development of microcomputer-based mental acuity tests

    Science.gov (United States)

    Turnage, J. J.; Kennedy, R. S.; Smith, M. G.; Baltzley, D. R.; Lane, N. E.

    1992-01-01

    Recent disasters have focused attention on performance problems due to the use of alcohol and controlled substances in the workplace. Environmental stressors such as thermal extremes, mixed gases, noise, motion, and vibration also have adverse effects on human performance and operator efficiency. However, the lack of a standardized, sensitive, human performance assessment battery has probably delayed the systematic study of the deleterious effects of various toxic chemicals and drugs at home and in the workplace. The collective goal of the research reported here is the development of a menu of tests embedded in a coherent package of hardware and software that may be useful in repeated-measures studies of a broad range of agents that can degrade human performance. A menu of 40 tests from the Automated Performance Test System (APTS) is described, and the series of interlocking studies supporting its development is reviewed. The APTS tests, which run on several versions of laptop portables and desktop personal computers, have been shown to be stable, reliable, and factorially rich, and to have predictive validities with holistic measures of intelligence and simulator performances. In addition, sensitivity studies have been conducted in which performance changes due to stressors, agents, and treatments were demonstrated. We believe that tests like those described here have prospective use as an adjunct to urine testing for the screening for performance loss of individuals who are granted access to workplaces and stations that impact public safety.

  12. Tests of Shaft Seal Systems of Circulation Pumps during Station Blackout

    Energy Technology Data Exchange (ETDEWEB)

    Beisiegel, A.; Foppe, F.; Wich, M.

    2014-07-01

    AREVA GmbH operates a unique Thermal-hydraulic plat form in Germany, France and USA. It is recognised as a test body according to ISO 17025. The Deutsche Akkreditierungsstelle GmbH (DAkkS - German Society for Accreditation) has also certified the Thermal-hydraulic platform as an independent inspection body Type C according to ISO 17020. A part of this platform is the Component Laboratory located in Karlstein, Germany which is in operation since more than 50 years. The testing activities cover a wide range as: Critical Heat Flux Tests, Valve Testing and Environmental Qualification for safety related components. Since 2011 the Component Qualification Karlstein extended their testing scope for different types of Shaft Seal Systems. (Author)

  13. Testing the reliability of supply pipings of the pump-fed power station Markersbach

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, W; Perout, A; Hellwig, K

    1981-01-01

    The leakage tests for the pressurised part of steam raising units is carried out during erection of steam raising units by halogen leak indicators. The effect which is produced by spontaneous change of alkali emission of a glowing anode if it comes into contact with molecules containing halogens is used. The erection leak detection equipment which is independent of the mains supply, works on the principle of high voltage corona discharge. Other equipment is also described briefly. All the equipment described uses dichlorfluormethane (CF/sub 2/Cl/sub 2/) as the halogen test gas - with the commercial name Fridohna 12. The test pressure in the pressurised part of the steam raising unit is 0.5 MPa and the mixing ratio of Fridohna 12 to compressed air is 0.12 kg of Fridohna 12 to 1 cubic metre of atmospheric air. The halogen leak test is superior to the water pressure test.

  14. Station Capacity

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    the probability of conflicts and the minimum headway times into account. The last method analyzes how optimal platform tracks are used by examining the arrival and departure pattern of the trains. The developed methods can either be used separately to analyze specific characteristics of the capacity of a station......Stations are often limiting the capacity of railway networks. This is due to extra need of tracks when trains stand still, trains turning around, and conflicting train routes. Although stations are often the capacity bottlenecks, most capacity analysis methods focus on open line capacity. Therefore...... for platform tracks and the probability that arriving trains will not get a platform track immediately at arrival. The third method is a scalable method that analyzes the conflicts in the switch zone(s). In its simplest stage, the method just analyzes the track layout while the more advanced stages also take...

  15. Test and Behaviour Driven Development with Python

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    Experience has taught us that bugs are impossible to avoid when programming. Specially on continuous delivery processes where there are new versions that refactor or incorporate new modules to the project. Although, there are different tools which help us to ensure code quality by enabling developers to catch bugs while still in the development stage. In this talk, I will talk about Test-driven development(TDD) and Behaviour-Driven development (BDD) methodologies focused on web development. Also, I will present an overview of unit testing tools as Selenium or Behave, which help us to produce working software, with fewer bugs, quickly and consistently.

  16. Recent developments in dynamic testing of materials

    Directory of Open Access Journals (Sweden)

    Gilat Amos

    2015-01-01

    Full Text Available New techniques for dynamic characterization of materials that have been developed in the last three years (since the last DYMAT conference in 2012, and results from recent dynamic testing of Inconel 718 are presented. The first development is a dynamic punch test in which three dimensional Digital Image Correlation (DIC is used to measure the deformation of the rear surface of a specimen as it being penetrated. The second experimental technique that is under development is a dynamic tension experiment in which full-field strain measurement with DIC and full-field temperature measurement are done simultaneously during the test.

  17. Extended Bioventing Testing Results at the BX Service Station Site, Patrick AFB, Florida

    National Research Council Canada - National Science Library

    Marchand, Ed

    1997-01-01

    .... Soil gas samples were collected, and in situ respiration testing was performed by Parsons ES from 8 to 14 November 1996 to assess the extent of remediation completed during approximately 3 months...

  18. Human Factors Assessment of the UH-60M Crew Station During the Limited User Test (LUT)

    National Research Council Canada - National Science Library

    Havir, Thomas J; Durbin, David B; Frederick, Lorraine J; Hicks, Jamison S

    2006-01-01

    The utility helicopter (UH)-60M Product Manager requested the U.S. Army Research Laboratory's Human Research and Engineering Directorate to participate in the Limited User Test for the UH-60M Black Hawk...

  19. Development of a Power Electronics Unit for the Space Station Plasma Contactor

    Science.gov (United States)

    Hamley, John A.; Hill, Gerald M.; Patterson, Michael J.; Saggio, Joseph, Jr.; Terdan, Fred; Mansell, Justin D.

    1994-01-01

    A hollow cathode plasma contactor has been baselined as a charge control device for the Space Station (SS) to prevent deleterious interactions of coated structural components with the ambient plasma. NASA LeRC Work Package 4 initiated the development of a plasma contactor system comprised of a Power Electronics Unit (PEU), an Expellant Management Unit (EMU), a command and data interface, and a Plasma Contactor Unit (PCU). A breadboard PEU was designed and fabricated. The breadboard PEU contains a cathode heater and discharge power supply, which were required to operate the PCU, a control and auxiliary power converter, an EMU interface, a command and telemetry interface, and a controller. The cathode heater and discharge supplies utilized a push-pull topology with a switching frequency of 20 kHz and pulse-width-modulated (PWM) control. A pulse ignition circuit derived from that used in arcjet power processors was incorporated in the discharge supply for discharge ignition. An 8088 based microcontroller was utilized in the breadboard model to provide a flexible platform for controller development with a simple command/data interface incorporating a direct connection to SS Mulitplexer/Demultiplexer (MDM) analog and digital I/O cards. Incorporating this in the flight model would eliminate the hardware and software overhead associated with a 1553 serial interface. The PEU autonomously operated the plasma contactor based on command inputs and was successfully integrated with a prototype plasma contactor unit demonstrating reliable ignition of the discharge and steady-state operation.

  20. Performance testing of the environmental TLD system for the Three Mile Island Nuclear Station.

    Science.gov (United States)

    Toke, L F; Carson, B H; Baker, G G; McBride, M H; Plato, P A; Miklos, J A

    1984-05-01

    Panasonic UD-801 thermoluminescent dosimeters ( TLDs ) containing two calcium sulfate phosphors were tested under Performance Specification 3.1 established by the American National Standard Institute ( ANSI75 ) and in the U.S. Nuclear Regulatory Commission's Regulatory Guide 4.13 ( NRC77 ). The specific qualifying tests included TLD uniformity, reproducibility, energy dependence and directional dependence. The overall measurement uncertainties and associated confidence levels are within the prescribed guidelines defined in the qualifying requirements for environmental TLDs .

  1. Development of a flight software testing methodology

    Science.gov (United States)

    Mccluskey, E. J.; Andrews, D. M.

    1985-01-01

    The research to develop a testing methodology for flight software is described. An experiment was conducted in using assertions to dynamically test digital flight control software. The experiment showed that 87% of typical errors introduced into the program would be detected by assertions. Detailed analysis of the test data showed that the number of assertions needed to detect those errors could be reduced to a minimal set. The analysis also revealed that the most effective assertions tested program parameters that provided greater indirect (collateral) testing of other parameters. In addition, a prototype watchdog task system was built to evaluate the effectiveness of executing assertions in parallel by using the multitasking features of Ada.

  2. Structural integrity test of prestressed concrete containment vessel for Tsuruga Unit No. 2 Nuclear Power Station

    International Nuclear Information System (INIS)

    Tamura, S.; Nagata, K.; Takeda, T.; Yamaguchi, T.; Nakayama, T.

    1987-01-01

    In introducing the PCCV to Japan, various verification tests were carried out to understand the structural performance of the PCCV and confirm the reliability of its design. In addition to those tests, a Structural Integrity Test (SIT) was conducted in Feb. 1986 as a final acceptance test. This report discusses the results of the SIT on the PCCV. The test was carried out simultaneously with an Integrated Leak Rate Test (ILRT) under the same pressure sequence. 1) Pressure-displacement relationships and pressure-strain relationships were more or less linear. 2) The measured displacement values at the maximum pressure (4.5 kgf/cm 2 G) corresponded well with calculated values. Correspondence with converted displacement obtained from strain and measured displacement was also good. 3) The residual displacement when 24 hours had elapsed after completion of depressurization was not more than 10% of the displacement at the maximum pressure. 4) The variation in tendon force at the maximum pressure is smaller than the calculated value in proportion to the elongation of the PCCV. 5) Although fine surface cracks due to shrinkage of concrete were seen, new structural cracks due to pressure were not observed. The leakage rate was evaluated at 0.016% of volume per day. It is much smaller than the design value of 0.1% of volume per day. (orig./HP)

  3. Risk-based inservice testing program modifications at Palo Verde nuclear generating station

    Energy Technology Data Exchange (ETDEWEB)

    Knauf, S.; Lindenlaub, B.; Linthicum, R.

    1996-12-01

    Arizona Public Service Company (APS) is investigating changes to the Palo Verde Inservice Testing (IST) Program that are intended to result in the reduction of the required test frequency for various valves in the American Society of Mechanical Engineers (ASME) Section XI IST program. The analytical techniques employed to select candidate valves and to demonstrate that these frequency reductions are acceptable are risk based. The results of the Palo Verde probabilistic risk assessment (PRA), updated in June 1994, and the risk significant determination performed as part of the implementation efforts for 10 CFR 50.65 (the maintenance rule) were used to select candidate valves for extended test intervals. Additional component level evaluations were conducted by an `expert panel.` The decision to pursue these changes was facilitated by the ASME Risk-Based Inservice Testing Research Task Force for which Palo Verde is participating as a pilot plant. The NRC`s increasing acceptance of cost beneficial licensing actions and risk-based submittals also provided incentive to seek these changes. Arizona Public Service is pursuing the risk-based IST program modification in order to reduce the unnecessary regulatory burden of the IST program through qualitative and quantitative analysis consistent with maintaining a high level of plant safety. The objectives of this project at Palo Verde are as follows: (1) Apply risk-based technologies to IST components to determine their risk significance (i.e., high or low). (2) Apply a combination of deterministic and risk-based methods to determine appropriate testing requirements for IST components including improvement of testing methods and frequency intervals for high-risk significant components. (3) Apply risk-based technologies to high-risk significant components identified by the {open_quotes}expert panel{close_quotes} and outside of the IST program to determine whether additional testing requirements are appropriate.

  4. Risk-based inservice testing program modifications at Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Knauf, S.; Lindenlaub, B.; Linthicum, R.

    1996-01-01

    Arizona Public Service Company (APS) is investigating changes to the Palo Verde Inservice Testing (IST) Program that are intended to result in the reduction of the required test frequency for various valves in the American Society of Mechanical Engineers (ASME) Section XI IST program. The analytical techniques employed to select candidate valves and to demonstrate that these frequency reductions are acceptable are risk based. The results of the Palo Verde probabilistic risk assessment (PRA), updated in June 1994, and the risk significant determination performed as part of the implementation efforts for 10 CFR 50.65 (the maintenance rule) were used to select candidate valves for extended test intervals. Additional component level evaluations were conducted by an 'expert panel.' The decision to pursue these changes was facilitated by the ASME Risk-Based Inservice Testing Research Task Force for which Palo Verde is participating as a pilot plant. The NRC's increasing acceptance of cost beneficial licensing actions and risk-based submittals also provided incentive to seek these changes. Arizona Public Service is pursuing the risk-based IST program modification in order to reduce the unnecessary regulatory burden of the IST program through qualitative and quantitative analysis consistent with maintaining a high level of plant safety. The objectives of this project at Palo Verde are as follows: (1) Apply risk-based technologies to IST components to determine their risk significance (i.e., high or low). (2) Apply a combination of deterministic and risk-based methods to determine appropriate testing requirements for IST components including improvement of testing methods and frequency intervals for high-risk significant components. (3) Apply risk-based technologies to high-risk significant components identified by the open-quotes expert panelclose quotes and outside of the IST program to determine whether additional testing requirements are appropriate

  5. Common Data Acquisition Systems (DAS) Software Development for Rocket Propulsion Test (RPT) Test Facilities

    Science.gov (United States)

    Hebert, Phillip W., Sr.; Davis, Dawn M.; Turowski, Mark P.; Holladay, Wendy T.; Hughes, Mark S.

    2012-01-01

    The advent of the commercial space launch industry and NASA's more recent resumption of operation of Stennis Space Center's large test facilities after thirty years of contractor control resulted in a need for a non-proprietary data acquisition systems (DAS) software to support government and commercial testing. The software is designed for modularity and adaptability to minimize the software development effort for current and future data systems. An additional benefit of the software's architecture is its ability to easily migrate to other testing facilities thus providing future commonality across Stennis. Adapting the software to other Rocket Propulsion Test (RPT) Centers such as MSFC, White Sands, and Plumbrook Station would provide additional commonality and help reduce testing costs for NASA. Ultimately, the software provides the government with unlimited rights and guarantees privacy of data to commercial entities. The project engaged all RPT Centers and NASA's Independent Verification & Validation facility to enhance product quality. The design consists of a translation layer which provides the transparency of the software application layers to underlying hardware regardless of test facility location and a flexible and easily accessible database. This presentation addresses system technical design, issues encountered, and the status of Stennis development and deployment.

  6. Exemplar PV system for test and development

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report describes the construction of Reference Photovoltaic System for Test and Development at University of Southampton between April 1995 and June 2000, which subsequently became known as the STaR Facility. (author)

  7. IEEE guide for planning of pre-operational testing programs for class 1E power systems for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Institute of Electrical and Electronics Engineers (IEEE) guide for pre-operational testing of Class 1E power systems for nuclear-power generating stations is presented. The guidelines apply to power systems both ac and dc supplies but not to the equipment which utilizes the ac and dc power. The pre-operational tests are performed after appropriate construction tests

  8. Waste water processing technology for Space Station Freedom - Comparative test data analysis

    Science.gov (United States)

    Miernik, Janie H.; Shah, Burt H.; Mcgriff, Cindy F.

    1991-01-01

    Comparative tests were conducted to choose the optimum technology for waste water processing on SSF. A thermoelectric integrated membrane evaporation (TIMES) subsystem and a vapor compression distillation subsystem (VCD) were built and tested to compare urine processing capability. Water quality, performance, and specific energy were compared for conceptual designs intended to function as part of the water recovery and management system of SSF. The VCD is considered the most mature and efficient technology and was selected to replace the TIMES as the baseline urine processor for SSF.

  9. DTU PMU Laboratory Development - Testing and Validation

    OpenAIRE

    Garcia-Valle, Rodrigo; Yang, Guang-Ya; Martin, Kenneth E.; Nielsen, Arne Hejde; Østergaard, Jacob

    2010-01-01

    This is a report of the results of phasor measurement unit (PMU) laboratory development and testing done at the Centre for Electric Technology (CET), Technical University of Denmark (DTU). Analysis of the PMU performance first required the development of tools to convert the DTU PMU data into IEEE standard, and the validation is done for the DTU-PMU via a validated commercial PMU. The commercial PMU has been tested from the authors' previous efforts, where the response can be expected to foll...

  10. Morphoagrobiological properties and productivity of new soft winter wheat varieties under the conditions of Kirovohrad variety testing station

    Directory of Open Access Journals (Sweden)

    О. Л. Уліч

    2017-03-01

    Full Text Available Purpose. To study morphoagrobiological and adaptive properties, level of yielding capacity of recently registered soft winter wheat varieties of various ecological groups under agroecological conditions of Kirovohrad variety testing station. Methods. Field study, laboratory test, analytical procedure and statistical evaluation. Results. It was established that the yield level of is a key composite indicator of genotype adaptation to agroecological growing conditions. Experimental data indicate significant deviations of yield depending on the genotype and the year of study. During three years of experiments, yield depending of the variety ranged from 4.26 to 9.71 t/ha, such varieties as ‘CN Kombin’, ‘Estivus’, ‘Tradytsiia odeska’, ‘Mudrist odeska’, ‘Lil’ and ‘Fabius’ had higher yields. In case of dry weather conditions and unfavorable agro-ecological factors, the following varieties as ‘Mudrist odeska’, ‘Veteran’, ‘Lil’, ‘Tsentylivka’, ‘Fabius’, ‘Patras’, ‘Montrei’ have demonstrated good adaptive properties. Their yield has decreased by 9,2–19,0%, while in the varieties ‘Mahistral’, ‘Poltavka’, ‘Harantiia odeska’ and ‘Pokrova’ – by 34.4, 42.4, 45.2 and 50.6% accordingly. Conclusions. Investigated soft winter wheat varieties differ in morphoagrobiological characteristics, productivity, height, maturation period, adaptability as well as economic and agronomic value. According to the complex of such indices as productivity, agronomic characters and properties as well as adaptability, in the microzone of Kirovohrad variety testing station it is advisable to grow varie­ties ‘CN Kombi’, ‘Pokrova’, ‘Mudrist odeska’, ‘Veteran’ and ‘Lil’.

  11. Vehicle Impact Testing of Snow Roads at McMurdo Station, Antarctica

    Science.gov (United States)

    2014-06-01

    especially during warm weather when their high flotation tires al- low greater over-snow mobility. Table 2. Test vehicle information. Vehicle Vehicle...potential danger to the vehicle and pax 16 ERDC/CRREL TR-14-9 51 GO SLOWTI-U<OtJG-ISBTFOR YOLH?. SAFETY LANE C SCOTT BASE TRANSIT/ONTO SILVER

  12. Space station common module thermal management: Design and construction of a test bed

    Science.gov (United States)

    Barile, R. G.

    1986-01-01

    In this project, a thermal test bed was designed, simulated, and planned for construction. The thermal system features interior and exterior thermal loads and interfacing with the central-radiator thermal bus. Components of the test bed include body mounted radiator loop with interface heat exchangers (600 Btu/hr); an internal loop with cabin air-conditioning and cold plates (3400 Btu/hr); interface heat exchangers to the central bus (13,000 Btu/hr); and provisions for new technology including advanced radiators, thermal storage, and refrigeration. The apparatus will be mounted in a chamber, heated with lamps, and tested in a vacuum chamber with LN2-cooled walls. Simulation of the test bed was accomplished using a DEC PRO 350 computer and the software package TK! olver. Key input variables were absorbed solar radiation and cold plate loads. The results indicate temperatures on the two loops will be nominal when the radiation and cold plate loads are in the range of 25% to 75% of peak loads. If all loads fall to zero, except the cabin air system which was fixed, the radiator fluid will drop below -100 F and may cause excessive pressure drop. If all loads reach 100%, the cabin air temperature could rise to 96 F.

  13. Efficient separations and processing crosscutting program: Develop and test sorbents

    International Nuclear Information System (INIS)

    Bray, L.A.

    1995-09-01

    This report summarizes work performed during FY 1995 under the task open-quotes Develop and Test Sorbents,close quotes the purpose of which is to develop high-capacity, selective solid extractants to recover cesium, strontium, and technetium from nuclear wastes. This work is being done for the Efficient Separations and Processing Crosscutting Program (ESP), operated by the U.S. Department of Energy's Office of Environmental Management's Office of Technology Development. The task is under the direction of staff at Pacific Northwest Laboratory (PNL) with key participation from industrial and university staff at 3M, St. Paul, Minnesota; IBC Advanced Technologies, Inc., American Forks, Utah; AlliedSignal, Inc., Des Plaines, Illinois, and Texas A ampersand M University, College Station, Texas. 3M and IBC are responsible for ligand and membrane technology development; AlliedSignal and Texas A ampersand M are developing sodium titanate powders; and PNL is testing the materials developed by the industry/university team members. Major accomplishments for FY 1995 are summarized in this report

  14. The development and implementation of a dry active waste (DAW) sorting program at Catawba Nuclear Station

    International Nuclear Information System (INIS)

    Schulte, J.H.; McNamara, P.N.

    1988-01-01

    Duke Power Company, like other nuclear utilities, bears a burdensome radwaste disposal cost that has rapidly escalated during recent years. Dry active waste (DAW) represents approximately 85% of the total radioactive waste volume shipped to low-level disposal facilities. Sorting waste with less than detectable radioactivity from waste with detectable radioactivity provides a volume reduction (VR) technique that can save significant radwaste disposal costs and conserve dwindling burial space. This paper presents the development and results of a project that was conducted at Catawba Nuclear Station to determine the volume reduction potential from sorting DAW. Guidelines are given so that other utilities can perform a VR potential study on a low cost basis. Based on the results of the DAW VR study, an overall DAW volume radiation program was initiated at Duke Power Company. This program includes personnel training, drumming techniques, bag tracking and equipment purchases for sorting. This program has been fully implemented at Duke Power Company since January 1, 1988 and preliminary results and savings are given

  15. Development of Cold Neutron Activation Station at HANARO Cold Neutron Source

    International Nuclear Information System (INIS)

    Sun, G. M.; Hoang, S. M. T.; Moon, J. H.; Chung, Y. S.; Cho, S. J.; Lee, K. H.; Park, B. G.; Choi, H. D.

    2012-01-01

    A new cold neutron source at the HANARO Research Reactor had been constructed in the framework of a five-year project, and ended in 2009. It has seven neutron guides, among which five guides were already allocated for a number of neutron scattering instruments. A new two-year project to develop a Cold Neutron Activation Station (CONAS) was carried out at the two neutron guides since May 2010, which was supported by the program of the Ministry of Education, Science and Technology, Korea. Fig. 1 shows the location of CONAS. CONAS is a complex facility including several radioanalytical instruments utilizing neutron capture reaction to analyze elements in a sample. It was designed to include three instruments like a CN-PGAA (Cold Neutron - Prompt Gamma Activation Analysis), a CN-NIPS (Cold Neutron - Neutron Induced Pair Spectrometer), and a CN-NDP (Cold Neutron - Neutron-induced prompt charged particle Depth Profiling). Fig. 2 shows the conceptual configuration of the CONAS concrete bioshield and the instruments. CN-PGAA and CN-NIPS measure the gamma-rays promptly emitted from the sample after neutron capture, whereas CN-NDP is a probe to measure the charged particles emitted from the sample surface after neutron capture. For this, we constructed two cold neutron guides called CG1 and CG2B guides from the CNS

  16. The development of on-line thermal performance monitors in Nuclear Electric Company's stations

    International Nuclear Information System (INIS)

    Conner, A.S.

    1992-01-01

    The paper examines the economic benefits of using on-line monitoring techniques in assisting Station Staff with the task of optimising the efficient use of reactor fuel. The role of thermal performance monitoring for detecting changes in plant condition is also examined and the way in which the data can be used by engineers to assist with the preparation of operating and maintenance programmes. To enable genuine gradual changes in plant performance to be detected when operating against a background of changing plant signal accuracy conditions, plant transducers have to be calibrated on a regular basis. This can be both costly and labour intensive. To reduce this requirement for regular calibrations, an automatic software signal verification program has been developed for use in on-line monitoring schemes. It forms part of the total unit performance calculation package and uses a whole plant model to verify plant signals. All plant signals used to calculate unit heat rate are verified typically every 15 minutes with signals going outside predetermined limits being automatically reported to the user. The program is interactive allowing the user to interrogate the condition of the signal, with respect to both its error magnitude and rate of drift outside signal limits. The program runs in real time mode on a Workstation connected directly to the plant

  17. The Prospect of Solar Energy in the Development of Power Stations in the State of Kuwait

    Directory of Open Access Journals (Sweden)

    Mohammad Ramadhan

    2013-01-01

    Full Text Available Over the years, the production capacity for power generation has not been able to keep pace with the surge in electricity demand in the oil-rich State of Kuwait. To expand its power generation capacity, Kuwait's strategic energy plans focus on constructing gas turbine and fuel oil stations. This paper aimed to evaluate the prospect of photovoltaic solar energy (PV in generating electricity as an alternative to decrease dependency on combined cycle gas turbine (CCGT power stations. It applies the LCOE framework to evaluate the economic feasibility of installing a 100 MW PV and CCGT power stations in Kuwait. The results indicate that under the assumption of 5% interest rate, the estimated LCOE of PV station ($0.19/kWh is unfeasible in comparison to the generation cost of gas turbine station ($0.11/kWh. However, the analysis has emphasized that evaluation of future electricity generation plans must not be limited to the LCOE criteria and should incorporate the following factors: the effect of natural gas supply constraints on the production of gas turbine plants, the environmental concerns of CO2 emissions, the peak load demand, and the domestic energy balance mix. The paper concludes that once these factors are addressed properly, the prospect of PV power stations becomes relatively feasible.

  18. The Cyborg Astrobiologist: testing a novelty detection algorithm on two mobile exploration systems at Rivas Vaciamadrid in Spain and at the Mars Desert Research Station in Utah

    Science.gov (United States)

    McGuire, P. C.; Gross, C.; Wendt, L.; Bonnici, A.; Souza-Egipsy, V.; Ormö, J.; Díaz-Martínez, E.; Foing, B. H.; Bose, R.; Walter, S.; Oesker, M.; Ontrup, J.; Haschke, R.; Ritter, H.

    2010-01-01

    In previous work, a platform was developed for testing computer-vision algorithms for robotic planetary exploration. This platform consisted of a digital video camera connected to a wearable computer for real-time processing of images at geological and astrobiological field sites. The real-time processing included image segmentation and the generation of interest points based upon uncommonness in the segmentation maps. Also in previous work, this platform for testing computer-vision algorithms has been ported to a more ergonomic alternative platform, consisting of a phone camera connected via the Global System for Mobile Communications (GSM) network to a remote-server computer. The wearable-computer platform has been tested at geological and astrobiological field sites in Spain (Rivas Vaciamadrid and Riba de Santiuste), and the phone camera has been tested at a geological field site in Malta. In this work, we (i) apply a Hopfield neural-network algorithm for novelty detection based upon colour, (ii) integrate a field-capable digital microscope on the wearable computer platform, (iii) test this novelty detection with the digital microscope at Rivas Vaciamadrid, (iv) develop a Bluetooth communication mode for the phone-camera platform, in order to allow access to a mobile processing computer at the field sites, and (v) test the novelty detection on the Bluetooth-enabled phone camera connected to a netbook computer at the Mars Desert Research Station in Utah. This systems engineering and field testing have together allowed us to develop a real-time computer-vision system that is capable, for example, of identifying lichens as novel within a series of images acquired in semi-arid desert environments. We acquired sequences of images of geologic outcrops in Utah and Spain consisting of various rock types and colours to test this algorithm. The algorithm robustly recognized previously observed units by their colour, while requiring only a single image or a few images to

  19. Principal facts of gravity stations with gravity and magnetic profiles from the southwest Nevada Test Site, Nye County, Nevada, as of January 1982

    International Nuclear Information System (INIS)

    Jansma, P.E.; Snyder, D.B.; Ponce, D.A.

    1983-01-01

    Three gravity profiles and principal facts of 2604 gravity stations in the southwest quadrant of the Nevada Test Site are documented in this data report. The residual gravity profiles show the gravity measurements and the smoothed curves derived from these points that were used in geophysical interpretations. The principal facts include station label, latitude, longitude, elevation, observed gravity value, and terrain correction for each station as well as the derived complete Bouguer and isostatic anomalies, reduced at 2.67 g/cm 3 . Accuracy codes, where available, further document the data

  20. Gas and water permeability tests of 25 year old concrete from the NPD Nuclear Generating Station

    International Nuclear Information System (INIS)

    Mills, R.H.

    1990-05-01

    Permeability tests on cores recovered from concrete which had been in service for 25 years in the Nuclear Power Demonstration (NPD) reactor showed rates of mass transfer of gas and water which were greater than young fresh concrete of the same proportions and that reported in previous AECB reports. This transparency of the concrete was also 2 orders of magnitude greater than that of comparable concrete which had been stored in the laboratory atmosphere for 19 years. Analysis of the effluent in water permeability tests revealed the presence of unusual amounts of soluble materials, mainly Na and K but little Ca, in the reactor concrete. This suggested service-related deterioration of the concrete rather than the release of soluble Ca by continuing hydration of cement

  1. IEEE Std 600: IEEE trial-use standard requirements for organizations that conduct qualification testing of safety systems equipment for use in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The purpose of this standard is to provide requirements for establishing a program for conducting qualification tests of safety systems equipment used in nuclear power generating stations. Compliance with the requirements of this standard does not assure the adequacy of the qualification tests performed. This standard applies to organizations that conduct qualification tests on equipment that has a definable safety function and is an identifiable part of a safety system for use in nuclear power generating stations. It requires a technical program, a quality assurance program, and a demonstrated ability to meet specified technical requirements. It does not apply to materials tests, production tests, normal performance testing, qualification by analysis, qualification by operating experience, or reliability tests such as diesel-generator multiple start tests. The intent of this standard is to achieve greater consistency, reliability, and reproducibility of test results and to provide adequate control of qualification testing of safety systems equipment

  2. NNWSI waste form performance test development

    International Nuclear Information System (INIS)

    Bates, J.K.; Gerding, T.J.

    1984-01-01

    A test method has been developed to measure the release of radionuclides from the waste package under simulated NNWSI repository conditions, and to provide information concerning materials interactions that may occur in the repository. Data from 13 weeks of unsaturated testing are discussed and compared to that from a 13-week analog test. The data indicate that the waste form test is capable of producing consistent, reproducible results that will be useful in evaluating the role of the waste in the long-term performance of the repository. 6 references, 3 figures

  3. Experience of manual periodic testing and development of automatic test devices

    International Nuclear Information System (INIS)

    Lorenzen, J.; Bergdahl, B.G.; Oguma, R.; Pazsit, I.; Akerhielm, F.

    1989-01-01

    During more than two decades experience has been gained in the field of process control and instrumentation using signal noise analysis applied to measurements at Swedish nuclear power plants. The methods developed and employed cover areas like: - Sensor and component status test in safety systems during operation, - Monitoring of BWR-stability during start-up, - Thermal time constant analysis on irradiated fuel, - Monitoring of instrument tube vibrations during operation, Self-diagnosing neutron detectors. Together with stationary surveillance systems like SOLNAS for Early Warning based on spectral analysis and Pattern Recognition we use a mobile mini-computer twin station and PC/AT sets. Further theory development goes hand in hand with experimental results obtained through measurement campaigns. In the following some of the work under progress, demonstrated or already applied is described and the results are reported correspondingly

  4. Providing Pressurized Gasses to the International Space Station (ISS): Developing a Composite Overwrapped Pressure Vessel (COPV) for the Safe Transport of Oxygen and Nitrogen

    Science.gov (United States)

    Kezirian, Michael; Cook, Anthony; Dick, Brandon; Phoenix, S. Leigh

    2012-01-01

    To supply oxygen and nitrogen to the International Space Station, a COPV tank is being developed to meet requirements beyond that which have been flown. In order to "Ship Full' and support compatibility with a range of launch site operations, the vessel was designed for certification to International Standards (ISO) that have a different approach than current NASA certification approaches. These requirements were in addition to existing NASA certification standards had to be met. Initial risk-reduction development tests have been successful. Qualification is in progress.

  5. Definition of technology development missions for early space station, orbit transfer vehicle servicing. Volume 1: Executive summary

    Science.gov (United States)

    1983-01-01

    Orbital Transfer Vehicle (OTV) servicing study scope, propellant transfer, storage and reliquefaction technology development missions (TDM), docking and berthing TDM, maintenance TDM, OTV/payload integration TDM, combined TDMS design, summary space station accomodations, programmatic analysis, and TDM equipment operational usage are discussed.

  6. Development of kit for detection of the larvae of fouling organisms flowing in the power station's water intake conduits

    International Nuclear Information System (INIS)

    Yanagawa, T.

    2009-01-01

    Massive settlement of the mussel Mytilus galloprovincialis and the barnacle Megabalanus rosa often causes serious problems in coastal industries: electric power stations, fisheries, marine services. This paper describes development of rapid and sensitive methods for on-site monitoring the larval settlement of the fouling species to make efficient the antifouling systems. (author)

  7. Determination of neutron energy spectrum at a pneumatic rabbit station of a typical swimming pool type material test research reactor

    International Nuclear Information System (INIS)

    Malkawi, S.R.; Ahmad, N.

    2002-01-01

    The method of multiple foil activation was used to measure the neutron energy spectrum, experimentally, at a rabbit station of Pakistan Research Reactor-1 (PARR-1), which is a typical swimming pool type material test research reactor. The computer codes MSITER and SANDBP were used to adjust the spectrum. The pre-information required by the adjustment codes was obtained by modelling the core and its surroundings in three-dimensions by using the one dimensional transport theory code WIMS-D/4 and the multidimensional finite difference diffusion theory code CITATION. The input spectrum covariance information required by MSITER code was also calculated from the CITATION output. A comparison between calculated and adjusted spectra shows a good agreement

  8. Development and radiation evaluation of mobile station for personnel monitoring system based on indigenous plastic scintillator sensor rods

    International Nuclear Information System (INIS)

    Chaudhary, H.S.; Parihar, A.; Senwar, K.R.; Prakash, V.; Rathore, A.S.

    2018-01-01

    The Mobile Station for Personnel Monitoring (MSPM) system has been designed and developed for rapid screening of personnel with respect to radiation contamination during nuclear or radiological emergency; it can also be used for prevention of illicit movement of radioactive sources. The objective was to develop a modular, transportable and easily deployable gamma portal monitoring system based on indigenous DLJ developed plastic scintillator sensors. The Gamma radiation response of the system is presented here

  9. Construction and start-up tests for Unit No. 5 of Fukushima Daiichi Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, T; Sunami, Y; Ishii, N; Yokojima, T [Toshiba Corp., Kawasaki, Kanagawa (Japan)

    1978-12-01

    This unit, with an output capacity of 874 MWe, was completed by Toshiba last April on the basis of the actual operation records of the units previously completed and the experience in construction. Since its completion it has continued very excellent operation, with no emergency stop. This article is a description of the Unit 5, about: (1) the design and major points of improvement; (2) the construction work and cleaning of the plant; and (3) the operation tests, the use of the first automatic fuel exchanger, and the plant management system including the rust-preventive measures for two years since the oil-crisis.

  10. Progress in FMIT test assembly development

    International Nuclear Information System (INIS)

    Opperman, E.K.; Vogel, M.A.; Shen, E.J.; Trego, A.L.

    1983-08-01

    Research and development supporting the completed design of the Fusion Materials Irradiation Test (FMIT) Facility is continuing at the Hanford Engineering Development Laboratory (HEDL) in Richland, Washington. The FMIT, a deuteron accelerator based (d + Li) neutron source, will produce an intense flux of high energy neutrons for use in radiation damage studies of fusion reactor materials. The most intense flux magnitude of greater than 10 15 n/cm 2 -s is located close to the neutron producing lithium target and is distributed within a volume about the size of an American football. The conceptual design and development of FMIT experiments called Test Assemblies has progressed over the past five years in parallel with the design of the FMIT. The paper will describe the recent accomplishments made in developing test assemblies appropriate for use in the limited volume close to the FMIT target where high neutron flux and heating rates and the associated spacial gradients significantly impact design considerations

  11. Testing the sampling efficiency of a nuclear power station stack monitor

    Energy Technology Data Exchange (ETDEWEB)

    Stroem, L.H. [Instrumentinvest, Nykoeping (Sweden)

    1997-08-01

    The test method comprises the injection of known amounts of monodisperse particles in the stack air stream, at a suitable point upstream of the sampling installation. To find a suitable injection polls, the gas flow was mapped by means of a tracer gas, released in various points in the stack base. The resulting concentration distributions at the stack sampler level were observed by means of an array of gas detectors. An injection point that produced symmetrical distribution over the stack area, and low concentrations at the stack walls was selected for the particle tests. Monodisperse particles of 6, 10, and 19 {mu}m aerodynamic diameter, tagged with dysprosium, were dispersed in the selected injection point. Particle concentration at the sampler level was measured. The losses to the stack walls were found to be less than 10 %. The particle concentrations at the four sampler inlets were calculated from the observed gas distribution. The amount calculated to be aspirated into the sampler piping was compared with the quantity collected by the sampling train ordinary filter, to obtain the sampling line transmission efficiency. 1 ref., 2 figs.

  12. Status of the Flooding Fragility Testing Development

    Energy Technology Data Exchange (ETDEWEB)

    Pope, C. L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Savage, B. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bhandari, B. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kamerman, D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Muchmore, C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Roberts, G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ryan, E. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Suresh, S. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Tahhan, A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Wells, A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, C. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-06-01

    This report provides an update on research addressing nuclear power plant component reliability under flooding conditions. The research includes use of the Component Flooding Evaluation Laboratory (CFEL) where individual components and component subassemblies will be tested to failure under various flooding conditions. The resulting component reliability data can then be incorporated with risk simulation strategies to provide a more thorough representation of overall plant risk. The CFEL development strategy consists of four interleaved phases. Phase 1 addresses design and application of CFEL with water rise and water spray capabilities allowing testing of passive and active components including fully electrified components. Phase 2 addresses research into wave generation techniques followed by the design and addition of the wave generation capability to CFEL. Phase 3 addresses methodology development activities including small scale component testing, development of full scale component testing protocol, and simulation techniques including Smoothed Particle Hydrodynamic (SPH) based computer codes. Phase 4 involves full scale component testing including work on full scale component testing in a surrogate CFEL testing apparatus.

  13. Status of the Flooding Fragility Testing Development

    International Nuclear Information System (INIS)

    Pope, C. L.; Savage, B.; Bhandari, B.; Kamerman, D.; Muchmore, C.; Roberts, G.; Ryan, E.; Suresh, S.; Tahhan, A.; Wells, A.; Smith, C.

    2016-01-01

    This report provides an update on research addressing nuclear power plant component reliability under flooding conditions. The research includes use of the Component Flooding Evaluation Laboratory (CFEL) where individual components and component subassemblies will be tested to failure under various flooding conditions. The resulting component reliability data can then be incorporated with risk simulation strategies to provide a more thorough representation of overall plant risk. The CFEL development strategy consists of four interleaved phases. Phase 1 addresses design and application of CFEL with water rise and water spray capabilities allowing testing of passive and active components including fully electrified components. Phase 2 addresses research into wave generation techniques followed by the design and addition of the wave generation capability to CFEL. Phase 3 addresses methodology development activities including small scale component testing, development of full scale component testing protocol, and simulation techniques including Smoothed Particle Hydrodynamic (SPH) based computer codes. Phase 4 involves full scale component testing including work on full scale component testing in a surrogate CFEL testing apparatus.

  14. Base Station Performance Model

    OpenAIRE

    Walsh, Barbara; Farrell, Ronan

    2005-01-01

    At present the testing of power amplifiers within base station transmitters is limited to testing at component level as opposed to testing at the system level. While the detection of catastrophic failure is possible, that of performance degradation is not. This paper proposes a base station model with respect to transmitter output power with the aim of introducing system level monitoring of the power amplifier behaviour within the base station. Our model reflects the expe...

  15. Development of the adaptive music perception test.

    Science.gov (United States)

    Kirchberger, Martin J; Russo, Frank A

    2015-01-01

    Despite vast amounts of research examining the influence of hearing loss on speech perception, comparatively little is known about its influence on music perception. No standardized test exists to quantify music perception of hearing-impaired (HI) persons in a clinically practical manner. This study presents the Adaptive Music Perception (AMP) test as a tool to assess important aspects of music perception with hearing loss. A computer-driven test was developed to determine the discrimination thresholds of 10 low-level physical dimensions (e.g., duration, level) in the context of perceptual judgments about musical dimensions: meter, harmony, melody, and timbre. In the meter test, the listener is asked to judge whether a tone sequence is duple or triple in meter. The harmony test requires that the listener make judgments about the stability of the chord sequences. In the melody test, the listener must judge whether a comparison melody is the same as a standard melody when presented in transposition and in the context of a chordal accompaniment that serves as a mask. The timbre test requires that the listener determines which of two comparison tones is different in timbre from a standard tone (ABX design). Twenty-one HI participants and 19 normal-hearing (NH) participants were recruited to carry out the music tests. Participants were tested twice on separate occasions to evaluate test-retest reliability. The HI group had significantly higher discrimination thresholds than the NH group in 7 of the 10 low-level physical dimensions: frequency discrimination in the meter test, dissonance and intonation perception in the harmony test, melody-to-chord ratio for both melody types in the melody test, and the perception of brightness and spectral irregularity in the timbre test. Small but significant improvement between test and retest was observed in three dimensions: frequency discrimination (meter test), dissonance (harmony test), and attack length (timbre test). All other

  16. DTU PMU Laboratory Development - Testing and Validation

    DEFF Research Database (Denmark)

    Garcia-Valle, Rodrigo; Yang, Guang-Ya; Martin, Kenneth E.

    2010-01-01

    This is a report of the results of phasor measurement unit (PMU) laboratory development and testing done at the Centre for Electric Technology (CET), Technical University of Denmark (DTU). Analysis of the PMU performance first required the development of tools to convert the DTU PMU data into IEEE...... standard, and the validation is done for the DTU-PMU via a validated commercial PMU. The commercial PMU has been tested from the authors' previous efforts, where the response can be expected to follow known patterns and provide confirmation about the test system to confirm the design and settings....... In a nutshell, having 2 PMUs that observe same signals provides validation of the operation and flags questionable results with more certainty. Moreover, the performance and accuracy of the DTU-PMU is tested acquiring good and precise results, when compared with a commercial phasor measurement device, PMU-1....

  17. Tests of shielding effectiveness of Kevlar and Nextel onboard the International Space Station and the Foton-M3 capsule.

    Science.gov (United States)

    Pugliese, M; Bengin, V; Casolino, M; Roca, V; Zanini, A; Durante, M

    2010-08-01

    Radiation assessment and protection in space is the first step in planning future missions to the Moon and Mars, where mission and number of space travelers will increase and the protection of the geomagnetic shielding against the cosmic radiation will be absent. In this framework, the shielding effectiveness of two flexible materials, Kevlar and Nextel, were tested, which are largely used in the construction of spacecrafts. Accelerator-based tests clearly demonstrated that Kevlar is an excellent shield for heavy ions, close to polyethylene, whereas Nextel shows poor shielding characteristics. Measurements on flight performed onboard of the International Space Station and of the Foton-M3 capsule have been carried out with special attention to the neutron component; shielded and unshielded detectors (thermoluminescence dosemeters, bubble detectors) were exposed to a real radiation environment to test the shielding properties of the materials under study. The results indicate no significant effects of shielding, suggesting that thin shields in low-Earth Orbit have little effect on absorbed dose.

  18. The WIPP research and development test program

    International Nuclear Information System (INIS)

    Tyler, L.D.

    1985-01-01

    The WIPP (Waste Isolation Pilot Plant) is a DOE RandD Facility for the purpose of developing the technology needed for the safe disposal of the United States defense-related radioactive waste. The in-situ test program is defined for the thermal-structural interactions, plugging and sealing, and waste package interactions in a salt environment. An integrated series of large-scale underground tests address the issues of both systems and long-term isolation performance of a repository

  19. Development of autonomous vehicles’ testing system

    Science.gov (United States)

    Ivanov, A. M.; Shadrin, S. S.

    2018-02-01

    This article describes overview of automated and, in perspective, autonomous vehicles’ (AV) implementation risks. Set of activities, actual before the use of AVs on public roads, minimizing negative technical and social problems of AVs’ implementation is presented. Classification of vehicle’s automated control systems operating conditions is formulated. Groups of tests for AVs are developed and justified, sequence of AVs’ testing system formation is proposed.

  20. Test Bench Development for Femur Stability Assessment

    Directory of Open Access Journals (Sweden)

    Samuel SANCHEZ-CABALLERO

    2015-01-01

    Full Text Available This paper shows the design and development of a test bench for humanfemurs. The main uses of this test bench will run from artificial femurs comparisonwith real femurs, to join stability assessment after bone a fracture repair. Amongthis uses is specially designed for condylar fractures testing. The test bench isdeveloped from a self-made existing tensile/compression testing machine. Thedesign procedure is supported by a literature review about the bone mechanicalbehavior and composition generally and the knee joint performance and repairparticularly. On the basis of this review, the machine was designed to simulate theadduction and abduction movements of the joint. The magnitudes to be measuredare: the compression force, the bone displacement (vertical and the knee jointrotation

  1. Development of a Danish speech intelligibility test

    DEFF Research Database (Denmark)

    Nielsen, Jens Bo; Dau, Torsten

    2009-01-01

    Abstract A Danish speech intelligibility test for assessing the speech recognition threshold in noise (SRTN) has been developed. The test consists of 180 sentences distributed in 18 phonetically balanced lists. The sentences are based on an open word-set and represent everyday language. The sente....... The test was verified with 14 normal-hearing listeners; the overall SRTN lies at a signal-to-noise ratio of -3.15 dB with a standard deviation of 1.0 dB. The list-SRTNs deviate less than 0.5 dB from the overall mean....

  2. Development for advanced materials and testing techniques

    Energy Technology Data Exchange (ETDEWEB)

    Hishinuma, Akimichi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-03-01

    Recent studies using a JMTR and research reactors of JRR-2 and JRR-3 are briefly summarized. Small specimen testing techniques (SSTT) required for an effective use of irradiation volume and also irradiated specimens have been developed focussing on tensile test, fatigue test, Charpy test and small punch test. By using the small specimens of 0.1 - several mm in size, similar values of tensile and fatigue properties to those by standard size specimens can be taken, although the ductile-brittle transition temperature (DBTT) depends strongly on Charpy specimen size. As for advanced material development, R and D about low activation ferritic steels have been done to investigate irradiation response. The low activation ferritic steel, so-called F82H jointly-developed by JAERI and NKK for fusion, has been confirmed to have good irradiation resistance within a limited dose and now selected as a standard material in the fusion material community. It is also found that TiAi intermetallic compounds, which never been considered for nuclear application in the past, have an excellent irradiation resistance under an irradiation condition. Such knowledge can bring about a large expectation for developing advanced nuclear materials. (author)

  3. Prototype Software for Future Spaceflight Tested at Mars Desert Research Station

    Science.gov (United States)

    Clancey, William J.; Sierhuis, Maaretn; Alena, Rick; Dowding, John; Garry, Brent; Scott, Mike; Tompkins, Paul; vanHoof, Ron; Verma, Vandi

    2006-01-01

    NASA scientists in MDRS Crew 49 (April 23-May 7, 2006) field tested and significantly extended a prototype monitoring and advising system that integrates power system telemetry with a voice commanding interface. A distributed, wireless network of functionally specialized agents interacted with the crew to provide alerts (e.g., impending shut-down of inverter due to low battery voltage), access md interpret historical data, and display troubleshooting procedures. In practical application during two weeks, the system generated speech over loudspeakers and headsets lo alert the crew about the need to investigate power system problems. The prototype system adapts the Brahms/Mobile Agents toolkit to receive data from the OneMeter (Brand Electronics) electric metering system deployed by Crew 47. A computer on the upper deck was connected to loudspeakers, four others were paired with wireless (Bluetooth) headsets that enabled crew members to interact with their personal agents from anywhere in the hab. Voice commands and inquiries included: 1. What is the {battery | generator} {volts | amps | volts and amps}? 2. What is the status of the {generator | inverter | battery | solar panel}? 3. What is the hab{itat} {power usage | volts | voltage | amps | volts and amps}? 4. What was the average hab{itat} {amps | volts | voltage} since {AM | PM)? 5. When did the {generator | batteries} change status? 6. Tell {me I | everyone} when{ ever} the generator goes offline. 7. Tell {me | | everyone} when the hab{itat} {amps | volts | voltage} {exceeds | drops brelow} . 8. {Send | Take | Record} {a} voice note {(for | to} } {at }. This research demonstrates the principles of design in the context of use, investigating requirements through experimental use of prototype systems in an analog setting, and use of MDRS as a research facility for designing and implementing new systems.

  4. A facility for training Space Station astronauts

    Science.gov (United States)

    Hajare, Ankur R.; Schmidt, James R.

    1992-01-01

    The Space Station Training Facility (SSTF) will be the primary facility for training the Space Station Freedom astronauts and the Space Station Control Center ground support personnel. Conceptually, the SSTF will consist of two parts: a Student Environment and an Author Environment. The Student Environment will contain trainers, instructor stations, computers and other equipment necessary for training. The Author Environment will contain the systems that will be used to manage, develop, integrate, test and verify, operate and maintain the equipment and software in the Student Environment.

  5. Bell Canyon Test (BCT): cement development report

    International Nuclear Information System (INIS)

    Gulick, C.W.; Boa, J.A. Jr.; Buck, A.D.

    1980-05-01

    The Borehole Plugging (BHP) materials development program which has been underway at WES under Sandia sponsorship for about five years is reviewed. Development testing data for candidate grout mixtures for the BCT plug are presented. Field batching, mixing, and placement operations are discussed. Data from field samples molded during the two plug placements include strength, expansion, compressional wave velocity, dynamic modulus, density, and porosity. Microstructure and composition are compared for grout samples at ages of a few weeks and one year

  6. Development of a Cost-Effective Solar/Diesel Independent Power Plant for a Remote Station

    Directory of Open Access Journals (Sweden)

    Okeolu Samuel Omogoye

    2015-01-01

    Full Text Available The paper discusses the design, simulation, and optimization of a solar/diesel hybrid power supply system for a remote station. The design involves determination of the station total energy demand as well as obtaining the station solar radiation data. This information was used to size the components of the hybrid power supply system (HPSS and to determine its configuration. Specifically, an appropriate software package, HOMER, was used to determine the number of solar panels, deep-cycle batteries, and rating of the inverter that comprise the solar section of the HPSS. A suitable diesel generator was also selected for the HPSS after careful technical and cost analysis of those available in the market. The designed system was simulated using the HOMER software package and the simulation results were used to carry out the optimization of the system. The final design adequately meets the station energy requirement. Based on a life expectancy of twenty-five years, a cost-benefit analysis of the HPSS was carried out. This analysis shows that the HPSS has a lower cost as compared to a conventional diesel generator power supply, thus recommending the HPSS as a more cost-effective solution for this application.

  7. SRS environmental technology development field test platform

    International Nuclear Information System (INIS)

    Riha, B.D.; Rossabi, J.; Eddy-Dilek, C.A.

    1995-01-01

    A critical and difficult step in the development and implementation of new technologies for environmental monitoring and characterization is successfully transferring these technologies to industry and government users for routine assessment and compliance activities. The Environmental Sciences Section of the DOE Savannah River Technology Center provides a forum for developers, potential users, and regulatory organizations to evaluate new technologies in comparison with baseline technologies in a well characterized field test bed. The principal objective of this project is to conduct comprehensive, objective field tests of monitoring and characterization technologies that are not currently used in EPA standard methods and evaluate their performance during actual operating conditions against baseline methods. This paper provides an overview of the field test site and a description of some of the technologies demonstrated at the site including their field applications

  8. Next Generation Drivetrain Development and Test Program

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan; Erdman, Bill; Blodgett, Doug; Halse, Chris; Grider, Dave

    2015-11-03

    This presentation was given at the Wind Energy IQ conference in Bremen, Germany, November 30 through December 2, 2105. It focused on the next-generation drivetrain architecture and drivetrain technology development and testing (including gearbox and inverter software and medium-voltage inverter modules.

  9. Early Phonological Development: Creating an Assessment Test

    Science.gov (United States)

    Stoel-Gammon, Carol; Williams, A. Lynn

    2013-01-01

    This paper describes a new protocol for assessing the phonological systems of two-year-olds with typical development and older children with delays in vocabulary acquisition. The test (Profiles of Early Expressive Phonological Skills ("PEEPS"), Williams & Stoel-Gammon, in preparation) differs from currently available assessments in…

  10. Developing a solar panel testing system

    Directory of Open Access Journals (Sweden)

    Árpád Rácz

    2009-10-01

    Full Text Available Solar energy is increasingly used togenerate electricity for individual households. There isa wide variety of solar panel technologies, whichshould be tested at an individual level during theirlifetime. In this paper, the development of a testingstation at the University of Debrecen is presented. Thetesting system can be used for research andeducational purposes and for in field applicationsequally well.

  11. Experience and development of on-line BWR surveillance system at Onagawa nuclear power station unit-1

    International Nuclear Information System (INIS)

    Kishi, A.; Chiba, K.; Kato, K.; Ebata, S.; Ando, Y.; Sakamoto, H.

    1986-01-01

    ONAGAWA nuclear power station Unit-1 (Tohoku Electric Power Co.) is a BWR-4 nuclear power station of 524 MW electric power which started commercial operation in June 1984. To attain high reliability and applicability for ONAGAWA-1, Tohoku Electric Power Co. and Toshiba started a Research and Development project on plant surveillance and diagnosis from April 1982. Main purposes of this project are to: (1) Develop an on-line surveillance system and acquire its operating experience at a commercial BWR, (2) Assist in plant operation and maintenance by data acquisition and analysis, (3) Develop a new technique for plant surveillance and diagnosis. An outline of the project, operating experience gained from the on-line surveillance system and an introduction to new diagnosis techniques are reported in this paper. (author)

  12. Field pilot testing for chemical oxidation at the former Nitchequon meteorological station : decontamination project in isolated areas

    Energy Technology Data Exchange (ETDEWEB)

    Peisajovich, A. [Transport Canada, Montreal, PQ (Canada); Bergeron, E. [Golder Associates Ltd., Montreal, PQ (Canada); Barbeau, M. [Golder Associates Innovative Applications, Montreal, PQ (Canada); Lajoie, G. [Cree Regional Authority, Montreal, PQ (Canada)

    2006-07-01

    Field pilot testing for chemical oxidation at the former Nitchequon meteorological station was discussed. This presentation described the site location and provided an aerial view and cross section of the site. The historical background and condition of the site were then identified. Photographs and illustrations of the site and the source of the problem were provided. Photographs were also provided of the logistics, temporary camp, dismantling of tanks, equipment, pipeline dismantling, residues, methodology as well as a graphical representation of how to solve the problem. Other topics included technologies tested on site, full-scale remediation plans, remediation goals, step by step process, and costs distribution. Among the steps discussed was: vegetation removal; excavation of the first two feet of soil; transfer of contaminated soil on high-density polyethylene (HDPE) lining prior to treatment; cell construction; cell lining insulation; transfer of treated soil from the mixers to the curing cells; installation of HDPE top cover lining over the treated soil; and the addition of 12 inches of clean soil over the top cover lining. tabs., figs.

  13. Business Models for Solar Powered Charging Stations to Develop Infrastructure for Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Jessica Robinson

    2014-10-01

    Full Text Available Electric power must become less dependent on fossil fuels and transportation must become more electric to decrease carbon emissions and mitigate climate change. Increasing availability and accessibility of charging stations is predicted to increase purchases of electric vehicles. In order to address the current inadequate charging infrastructure for electric vehicles, major entities must adopt business models for solar powered charging stations (SPCS. These SPCS should be located in parking lots to produce electricity for the grid and provide an integrated infrastructure for charging electric vehicles. Due to the lack of information related to SPCS business models, this manuscript designs several models for major entities including industry, the federal and state government, utilities, universities, and public parking. A literature review of the available relevant business models and case studies of constructed charging stations was completed to support the proposals. In addition, a survey of a university’s students, staff, and faculty was conducted to provide consumer research on people’s opinion of SPCS construction and preference of business model aspects. Results showed that 69% of respondents would be more willing to invest in an electric vehicle if there was sufficient charging station infrastructure at the university. Among many recommendations, the business models suggest installing level 1 charging for the majority of entities, and to match entities’ current pricing structures for station use. The manuscript discusses the impacts of fossil fuel use, and the benefits of electric car and SPCS use, accommodates for the present gap in available literature on SPCS business models, and provides current consumer data for SPCS and the models proposed.

  14. Developing a vitamin greenhouse for the life support system of the international space station and for future interplanetary missions

    Science.gov (United States)

    Berkovich, Y. A.; Krivobok, N. M.; Sinyak, Yu. Ye.; Smolyanina, S. O.; Grigoriev, Yu. I.; Romanov, S. Yu.; Guissenberg, A. S.

    2004-01-01

    In order to evaluate the effects of gravity on growing plants, we conducted ground based long-term experiments with dwarf wheat, cultivar Apogee and Chinese cabbage, cultivar Khibinskaya. The test crops had been grown in overhead position with HPS lamp below root module so gravity and light intensity gradients had been in opposite direction. Plants of the control crop grew in normal position under the same lamp. Both crops were grown on porous metallic membranes with stable -1 kPa matric potential on their surface. Results from these and other studies allowed us to examine the differences in growth and development of the plants as well as the root systems in relation to the value of the gravity force influence. Dry weight of the roots from test group was decreased in 2.5 times for wheat and in 6 times - at the Chinese cabbage, but shoot dry biomass was practically same for both test and control versions. A harvest index of the test plants increased substantially. The data shows, that development of the plants was essentially changed in microgravity. The experiments in the space greenhouse Svet aboard the Mir space station proved that it is possible to compensate the effects of weightlessness on higher plants by manipulating gradients of environmental parameters (i.e. photon flux, matric potential in the root zone, etc.). However, the average productivity of Svet concerning salad crops even in ground studies did not provide more than 14 g fresh biomass per day. This does not provide a sufficient level of supplemental nutrients to the crew of the ISS. A cylindrical design of a space plant growth chamber (SPGC) allows for maximal productivity in presence of very tight energy and volume limitations onboard the ISS and provides a number of operational advantages. Productivity from this type of SPGF with a 0.5 kW energy utilization when salad growing would provide approximately 100 g of edible biomass per day, which would almost satisfy requirements for a crew of two in

  15. Development of small specimen test techniques. Development of a remote controlled small punch testing apparatus

    International Nuclear Information System (INIS)

    Ohmi, Masao; Saito, Junichi; Ooka, Norikazu; Jitsukawa, Shiro; Hishinuma, Akimichi; Umino, Akira.

    1997-01-01

    An accelerator-driven deuterium-lithium (d-Li) stripping reaction-type neutron source, such as the International Fusion Materials Irradiation Facility (IFMIF) planned by the International Energy Agency is recognized as one of the most promising facility to obtain test environments of high-energy neutrons for fusion reactor materials development. The limitation on the available irradiation volume of the irradiation facility requires the development of the small specimen test techniques (SSTT). Application of SSTT to evaluate the degradation of various components in the light water reactor for the life extension is expected to be also quite beneficial. A remote-controlled testing machine for the Small Punch (SP) and miniaturized tensile tests was developed at the hot laboratory of the Japan Materials Testing Reactor (JMTR). The machine is designed for testing at temperatures ranging between 93 and 1,123 K to evaluate the temperature dependence of the strength of materials including the embrittlement at low temperatures and the softening at elevated temperatures. The tests are performed in a vacuum or in an inert gas environment. The machine has been installed in a hot cell and is being used for the round robin test program of the SP test method. The round robin test program is planned to identify the capability of the test method and to establish a standard test procedure. The configuration and the specifications of the test machine are introduced and the results of the SP tests are also shown. (author)

  16. Recent developments in dynamic testing of materials

    Directory of Open Access Journals (Sweden)

    Seidt J.D.

    2012-08-01

    Full Text Available Three new testing configurations that have been developed since the last DYMAT conference in 2009 are presented. The first is high strain rate testing of Kevlar cloth and Kevlar yarn in a tensile Split Hopkinson Bar (SHB apparatus. The Kevlar cloth/yarn is attached to the bars by specially designed adaptors that keep the impedance constant. In addition to determining the specimen’s stress and strain from the recorded waves in the bars the deformations are also measured with Digital Image Correlation (DIC. The second testing configuration is a high strain rate shear test for sheet metal. The experiment is done by using a flat notched specimen in a tensile SHB apparatus. The shear strain is measured using DIC within the notch and on the boundary. The third development is a compression apparatus for testing at intermediate strain rates ranging from 20 s−1 to 200 s−1. The apparatus is a combination of a hydraulic actuator and a compression SHB. The stress in the specimen is determined from the stress wave in a very long transmitter bar and the strain and strain rate is determined by using DIC. The results show clean stress strain curves (no ringing.

  17. Field Testing of Activated Carbon Injection Options for Mercury Control at TXU's Big Brown Station

    Energy Technology Data Exchange (ETDEWEB)

    John Pavlish; Jeffrey Thompson; Christopher Martin; Mark Musich; Lucinda Hamre

    2009-01-07

    The primary objective of the project was to evaluate the long-term feasibility of using activated carbon injection (ACI) options to effectively reduce mercury emissions from Texas electric generation plants in which a blend of lignite and subbituminous coal is fired. Field testing of ACI options was performed on one-quarter of Unit 2 at TXU's Big Brown Steam Electric Station. Unit 2 has a design output of 600 MW and burns a blend of 70% Texas Gulf Coast lignite and 30% subbituminous Powder River Basin coal. Big Brown employs a COHPAC configuration, i.e., high air-to-cloth baghouses following cold-side electrostatic precipitators (ESPs), for particulate control. When sorbent injection is added between the ESP and the baghouse, the combined technology is referred to as TOXECON{trademark} and is patented by the Electric Power Research Institute in the United States. Key benefits of the TOXECON configuration include better mass transfer characteristics of a fabric filter compared to an ESP for mercury capture and contamination of only a small percentage of the fly ash with AC. The field testing consisted of a baseline sampling period, a parametric screening of three sorbent injection options, and a month long test with a single mercury control technology. During the baseline sampling, native mercury removal was observed to be less than 10%. Parametric testing was conducted for three sorbent injection options: injection of standard AC alone; injection of an EERC sorbent enhancement additive, SEA4, with ACI; and injection of an EERC enhanced AC. Injection rates were determined for all of the options to achieve the minimum target of 55% mercury removal as well as for higher removals approaching 90%. Some of the higher injection rates were not sustainable because of increased differential pressure across the test baghouse module. After completion of the parametric testing, a month long test was conducted using the enhanced AC at a nominal rate of 1.5 lb/Macf. During

  18. Multiphase Transport in Porous Media: Gas-Liquid Separation Using Capillary Pressure Gradients International Space Station (ISS) Flight Experiment Development

    Science.gov (United States)

    Wheeler, Richard R., Jr.; Holtsnider, John T.; Dahl, Roger W.; Deeks, Dalton; Javanovic, Goran N.; Parker, James M.; Ehlert, Jim

    2013-01-01

    Advances in the understanding of multiphase flow characteristics under variable gravity conditions will ultimately lead to improved and as of yet unknown process designs for advanced space missions. Such novel processes will be of paramount importance to the success of future manned space exploration as we venture into our solar system and beyond. In addition, because of the ubiquitous nature and vital importance of biological and environmental processes involving airwater mixtures, knowledge gained about fundamental interactions and the governing properties of these mixtures will clearly benefit the quality of life here on our home planet. The techniques addressed in the current research involving multiphase transport in porous media and gas-liquid phase separation using capillary pressure gradients are also a logical candidate for a future International Space Station (ISS) flight experiment. Importantly, the novel and potentially very accurate Lattice-Boltzmann (LB) modeling of multiphase transport in porous media developed in this work offers significantly improved predictions of real world fluid physics phenomena, thereby promoting advanced process designs for both space and terrestrial applications.This 3-year research effort has culminated in the design and testing of a zero-g demonstration prototype. Both the hydrophilic (glass) and hydrophobic (Teflon) media Capillary Pressure Gradient (CPG) cartridges prepared during the second years work were evaluated. Results obtained from ground testing at 1-g were compared to those obtained at reduced gravities spanning Martian (13-g), Lunar (16-g) and zero-g. These comparisons clearly demonstrate the relative strength of the CPG phenomena and the efficacy of its application to meet NASAs unique gas-liquid separation (GLS) requirements in non-terrestrial environments.LB modeling software, developed concurrently with the zero-g test effort, was shown to accurately reproduce observed CPG driven gas-liquid separation

  19. GPS and Galileo Developments on Board the International Space Station With the Space Communications and Navigation (SCaN) Testbed

    Science.gov (United States)

    Pozzobon, Oscar; Fantinato, Samuele; Dalla Chiara, Andrea; Gamba, Giovanni; Crisci, Massimo; Giordana, Pietro; Enderle, Werner; Chelmins, David; Sands, Obed S.; Clapper, Carolyn J.; hide

    2016-01-01

    The Space Communications and Navigation (SCaN) is a facility developed by NASA and hosted on board the International Space Station (ISS) on an external truss since 2013.It has the objective of testing navigation and communication experimentations with a Software Defined Radio (SDR) approach, which permits software updates for testing new experimentations.NASA has developed the Space Telecommunications Radio System (STRS) architecture standard for SDRs used in space and ground-based platforms to provide commonality among radio developments to provide enhanced capability. The hardware is equipped with both L band front-end radios and the NASA space network communicates with it using S-band, Ku-band and Ka-band links.In May 2016 Qascom started GARISS (GPS and Galileo Receiver for the ISS), an activity of experimentation in collaboration with ESA and NASA that has the objective to develop and validate the acquisition and processing of combined GPS and Galileo signals on board the ISS SCaN testbed. This paper has the objective to present the mission, and provide preliminary details about the challenges in the design, development and verification of the waveform that will be installed on equipment with limited resources. GARISS is also the first attempt to develop a waveform for the ISS as part of an international collaboration between US and Europe. Although the final mission objective is to target dual frequency processing, initial operations will foresee a single frequency processing. Initial results and trade-off between the two options, as well as the final decision will be presented and discussed. The limited resources on board the SCaN with respect to the challenging requirements to acquire and track contemporaneously two satellite navigation systems, with different modulations and data structure, led to the need to assess the possibility of aiding from ground through the S-band. This option would allow assistance to the space receiver in order to provide

  20. Development and field test of psychophysical tests for DWI arrest

    Science.gov (United States)

    1981-03-01

    Administration and scoring procedures were standardized for a sobriety test battery consisting of the walk-and-turn test, the one leg stand test, and horizontal gaze nystagmus. The effectiveness of the standardized battery was then evaluated in the l...

  1. Thermal Protection Test Bed Pathfinder Development Project

    Science.gov (United States)

    Snapp, Cooper

    2015-01-01

    In order to increase thermal protection capabilities for future reentry vehicles, a method to obtain relevant test data is required. Although arc jet testing can be used to obtain some data on materials, the best method to obtain these data is to actually expose them to an atmospheric reentry. The overprediction of the Orion EFT-1 flight data is an example of how the ground test to flight traceability is not fully understood. The RED-Data small reentry capsule developed by Terminal Velocity Aerospace is critical to understanding this traceability. In order to begin to utilize this technology, ES3 needs to be ready to build and integrate heat shields onto the RED-Data vehicle. Using a heritage Shuttle tile material for the heat shield will both allow valuable insight into the environment that the RED-Data vehicle can provide and give ES3 the knowledge and capability to build and integrate future heat shields for this vehicle.

  2. Demonstration test of electron beam flue gas treatment pilot plant of a coal fired thermal power station

    International Nuclear Information System (INIS)

    Doi, Yoshitaka; Hayashi, Kazuaki; Izutsu, Masahiro; Watanabe, Shigeharu; Namba, Hideki; Tokunaga, Okihiro; Hashimoto, Shoji; Tanaka, Tadashi; Ogura, Yoshimi.

    1995-01-01

    The Japan Atomic Energy Research Institute, Chubu Electric Power Company and Ebara Corporation jointly constructed a pilot plant for electron beam flue gas treatment (dry process) capable of treating 12,000 m 3 /h (NTP) of flue gas from a coal fired boiler, at Shin-Nagoya Thermal Power Station, Chubu Electric Power Company. Various tests carried out at the plant over a period extending one year verified the followings. By appropriately controlling parameters such as electron beam dosage, flue gas temperature, and ammonia stoichiometric amount, highly efficient simultaneous SO 2 and NOx removal from flue gas was achieved under all gas conditions, equal to or more efficient than that by the highest level conventional treatment. The operation of the pilot plant was stable and trouble-free over a long term, and the operation and the process was easy to operate and control. By-products (ammonium sulfate and ammonium nitrate) produced by the flue gas treatment were proven to have superior quality, equivalent to that of market-available nitrogen fertilizers. These by-products had been registered as by-product nitrogen fertilizers. (author)

  3. The International Space Station: A Low-Earth Orbit (LEO) Test Bed for Advancements in Space and Environmental Medicine

    Science.gov (United States)

    Ruttley, Tara M.; Robinson, Julie A.

    2010-01-01

    Ground-based space analog projects such as the NASA Extreme Environment Mission Operations (NEEMO) can be valuable test beds for evaluation of experimental design and hardware feasibility before actually being implemented on orbit. The International Space Station (ISS) is an closed-system laboratory that orbits 240 miles above the Earth, and is the ultimate extreme environment. Its inhabitants spend hours performing research that spans from fluid physics to human physiology, yielding results that have implications for Earth-based improvements in medicine and health, as well as those that will help facilitate the mitigation of risks to the human body associated with exploration-class space missions. ISS health and medical experiments focus on pre-flight and in-flight prevention, in-flight treatment, and postflight recovery of health problems associated with space flight. Such experiments include those on enhanced medical monitoring, bone and muscle loss prevention, cardiovascular health, immunology, radiation and behavior. Lessons learned from ISS experiments may not only be applicable to other extreme environments that face similar capability limitations, but also serve to enhance standards of care for everyday use on Earth.

  4. Design and development of CAMAC test module

    International Nuclear Information System (INIS)

    Kulkarni, S.G.; Gore, J. A.; Gupta, A.K.; Saxena, A.

    2015-01-01

    Various Computer automated measurement and control (CAMAC) modules are used in control and monitoring of Pelletron Accelerator. 24 channels CAMAC Input Gate is used for getting the ON/OFF status of various devices in the Pelletron Accelerator. If a channel has 24 V then the status is 'ON' and if the channel receives 0 V then the status is 'OFF'. Hence we can get the status of 24 different channels though one CAMAC Input Gate module. The status is transported to the PC via CAMAC controller. The manual testing of CAMAC Input Gate involves connection of 24 V to each channel and checking the status of each channel with Graphical user interface (GUI) software. This process of checking input gate is automated by developing a CAMAC Test module which is connected to CAMAC Input Gate with a 50 pin ribbon cable. The Test module automatically generates 24 V /0 V on each channel to be tested depending on the software GUI buttons labeled as 'ON'/'OFF' in labview. The status of CAMAC Input Gate is displayed on GUI for all 24 channels. Hence the user can check the working of each channel on GUI written in labview. This automated process of checking the CAMAC Input Gate saves time to debug problems in module and identifying the bad channel which can be subsequently repaired. The CAMAC Test module uses Spartan 2 FPGA which is connected to 24 transistors which in turn operates 24 relays. 24 V supply is connected to the relay secondary contacts which open/close as per the transistor inputs. The 24 V contacts are connected to the module output connector which should be connected to CAMAC Input Gate which is to be tested. (author)

  5. Test des photomultiplicateurs en silicium couplés à un scintillateur plastique pour la nouvelle Tape Station

    CERN Document Server

    sekal, Smain

    2014-01-01

    L’une des parties essentielles de la l’installation ISOLDE est la tape Station (contrôleur de bandes), qui permet la vérification de la qualité du faisceau délivré aux expériences. On prévoit à ISOLDE de remplacer l’ancienne Tape Station, par une nouvelle Tape station; et l’un des paramètres essentiels pour la performance de la tape Station est l’efficacité de détection. Le but de ce travail est de vérifier l’efficacité des détecteurs de particules bêta, composés par l’association des photomultiplicateurs en Silicium à un scintillateur plastique pour differentes distances.

  6. Tests of a new CCD-camera based neutron radiography detector system at the reactor stations in Munich and Vienna

    Energy Technology Data Exchange (ETDEWEB)

    Lehmann, E; Pleinert, H [Paul Scherrer Inst. (PSI), Villigen (Switzerland); Schillinger, B [Technische Univ. Muenchen (Germany); Koerner, S [Atominstitut der Oesterreichischen Universitaeten, Vienna (Austria)

    1997-09-01

    The performance of the new neutron radiography detector designed at PSI with a cooled high sensitive CCD-camera was investigated under real neutronic conditions at three beam ports of two reactor stations. Different converter screens were applied for which the sensitivity and the modulation transfer function (MTF) could be obtained. The results are very encouraging concerning the utilization of this detector system as standard tool at the radiography stations at the spallation source SINQ. (author) 3 figs., 5 refs.

  7. Development of upgraded full-core 3D diffusion models for the Pickering stations

    Energy Technology Data Exchange (ETDEWEB)

    Arsenault, B., E-mail: benoit.arsenault@amecfw.com [AMEC Foster Wheeler, Toronto, ON (Canada); Catovic, Z., E-mail: zlatko.catovic@opg.com [Ontario Power Generation, Pickering, ON (Canada); Shaula, S., E-mail: sergiy.shaula@amecfw.com [AMEC Foster Wheeler, Toronto, ON (Canada); Buchan, P.D., E-mail: david.buchan@opg.com [Ontario Power Generation, Pickering, ON (Canada)

    2015-07-01

    This paper describes a methodology used to model Pickering reactors with the Reactor Physics toolset currently in use at OPG stations, which includes the Reactor Physics Industry Standard Toolset (RFSP-IST/WIMS-IST/DRAGON-IST) and the fuel management code SORO. Detailed geometries were modeled in DRAGON-IST with devices and structures that extended into the reflector region and incremental properties were calculated for reactivity devices, guide tubes and structural materials based on the engineering drawings. Simulations and comparisons with measurements performed showed improved predictive capabilities of the new reactor physics models. (author)

  8. Development of upgraded full-core 3D diffusion models for the Pickering stations

    International Nuclear Information System (INIS)

    Arsenault, B.; Catovic, Z.; Shaula, S.; Buchan, P.D.

    2015-01-01

    This paper describes a methodology used to model Pickering reactors with the Reactor Physics toolset currently in use at OPG stations, which includes the Reactor Physics Industry Standard Toolset (RFSP-IST/WIMS-IST/DRAGON-IST) and the fuel management code SORO. Detailed geometries were modeled in DRAGON-IST with devices and structures that extended into the reflector region and incremental properties were calculated for reactivity devices, guide tubes and structural materials based on the engineering drawings. Simulations and comparisons with measurements performed showed improved predictive capabilities of the new reactor physics models. (author)

  9. Standards for the user interface - Developing a user consensus. [for Space Station Information System

    Science.gov (United States)

    Moe, Karen L.; Perkins, Dorothy C.; Szczur, Martha R.

    1987-01-01

    The user support environment (USE) which is a set of software tools for a flexible standard interactive user interface to the Space Station systems, platforms, and payloads is described in detail. Included in the USE concept are a user interface language, a run time environment and user interface management system, support tools, and standards for human interaction methods. The goals and challenges of the USE are discussed as well as a methodology based on prototype demonstrations for involving users in the process of validating the USE concepts. By prototyping the key concepts and salient features of the proposed user interface standards, the user's ability to respond is greatly enhanced.

  10. IEEE Std 383-1974: IEEE standard for type test of Class IE electric cables, field splices, and connections for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class IE Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices. This guide does not cover cables for service within the reactor vessel

  11. Development of Search-Coil Magnetometer for Ultra Low Frequency (ULF) Wave Observations at Jang Bogo Station in Antarctica

    Science.gov (United States)

    Lee, J. K.; Shin, J.; Kim, K. H.; Jin, H.; Kim, H.; Kwon, J.; Lee, S.; Jee, G.; Lessard, M.

    2016-12-01

    A ground-based bi-axial search-coil magnetometer (SCM) has been devloped for observation of time-varying magnetic fields (dB/dt) in the Ultra Low Frequency (ULF) range (a few mHz up to 5 Hz) to understand magnetosphere-ionosphere coupling processes. The SCM consists of magnetic sensors, analog electronics, cables and data acquisition system (DAQ). The bi-axial magnetic sensor has coils of wire wound around a mu-metal cores, each of which measures magnetic field pulsations in the horizontal components, geomagnetic north-south and east-west, respectively. The analog electronics is designed to control the cut-off frequency of the instrument and to amplify detected signals. The DAQ has a 16 bit analog to digital converter (ADC) at the user defined rate of 10 Hz. It is also equipped with the Global Positioning System (GPS) and Network Time Protocol (NTP) for time synchronization and accuracy. We have carried out in-lab performance tests (e.g., frequency response, noise level, etc) using a magnetically shielded case and a field-test in a magnetically quiet location in South Korea. During the field test, a ULF Pi 2 event has been observed clearly. We also confirmed that it was a substorm activity from a fluxgate magnetometer data at Mineyama (35°57.3'N, 135°05'E, geographic). The SCM will be installed and operated at Jang Bogo Antarctic Research Station (74°37.4'S, 164°13.7'E, geographic) on Dec. 2016. The geomagnetic latitude of the station is similar to that of the US McMurdo station (77°51'S, 166°40'E, geographic), both of which are typically near the cusp region. Thus, we expect that the SCM can provide useful information to understand ULF wave propagation characteristics.

  12. Steady reconstruction process - development, testing and comparison in ultrasonic testing

    International Nuclear Information System (INIS)

    Langenberg, K.J.; Schmitz, V.

    1986-01-01

    The fault parameters can be extracted from a few data of high quality in steady test procedures. The boundary conditions for the successful use of such a process were researched and found, so that by using theoretical models for the elasto-dynamic interaction of fault and ultrasonics, a concentration of wavefronts instead of resonances and a wide band careful collection of data makes a physical interpretation in the form of specific geometry torques possible. Models of the interaction of ultrasonics and faults for two fault geometries (cracks and pores) were developed which permit the calculation of A scans of any bandwidth and with any angle of scatter for the direct and mode converted parts of the elastic ultrasonic scatter wave. The curved pressure and shear waves including the mode converted bending fields over an angular range of 360deg were experimentally recorded. Their agreement including the additional wavefronts caused by the close field of the crack bending field is close. Classification of torques is done on two examples (crack, cylinder) for evaluation purposes. It was found that a classification was possible according to the sign of the a 1 polynomial coefficient. (orig./HP) [de

  13. Penetration Testing Curriculum Development in Practice

    Directory of Open Access Journals (Sweden)

    Chengcheng Li

    2015-04-01

    report for the management team to aid in strengthening the system, never to cause any real damages. This paper introduces the development of a penetration testing curriculum as a core class in an undergraduate cybersecurity track in Information Technology. The teaching modules are developed based on the professional penetration testing life cycle. The concepts taught in the class are enforced by hands-on lab exercises. This paper also shares the resources that are available to institutions looking for teaching materials and grant opportunities to support efforts when creating a similar curriculum in cybersecurity.

  14. Definition of technology development missions for early space stations orbit transfer vehicle serving. Phase 2, task 1: Space station support of operational OTV servicing

    Science.gov (United States)

    1983-01-01

    Representative space based orbital transfer vehicles (OTV), ground based vehicle turnaround assessment, functional operational requirements and facilities, mission turnaround operations, a comparison of ground based versus space based tasks, activation of servicing facilities prior to IOC, fleet operations requirements, maintenance facilities, OTV servicing facilities, space station support requirements, and packaging for delivery are discussed.

  15. Fire Stations

    Data.gov (United States)

    Department of Homeland Security — Fire Stations in the United States Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their...

  16. Developing the MAPLE materials test reactor concept

    International Nuclear Information System (INIS)

    Lee, A.G.; Lidstone, R.F.; Donnelly, J.V.

    1992-05-01

    MAPLE-MTR is a new multipurpose research facility being planned by AECL Research as a possible replacement for the 35-year-old NRU reactor. In developing the MAPLE-MTR concept, AECL is starting from the recent design and licensing experience with the MAPLE-X10 reactor. By starting from technology developed to support the MAPLE-X10 design and adapting it to produce a concept that satisfies the requirements of fuel channel materials testing and fuel irradiation programs, AECL expects to minimize the need for major advances in nuclear technology (e.g., fuel, heat transfer). Formulation of the MAPLE-MTR concept is at an early stage. This report describes the irradiation requirements of the research areas, how these needs are translated into design criteria for the project and elements of the preliminary design concept

  17. Gas recovery and self-testing systm in gasoline stations. Execution of practical field tests / phase of tests in the wholistic system; Gasrueckfuehrung und selbstueberwachende Systeme an Tankstellen. Durchfuehrung von praktischen Feldtests/Testphase im ganzheitlichen System

    Energy Technology Data Exchange (ETDEWEB)

    Altmann, B.R.; Kunter, S.; Maurer, C.; Schneider, T.; Schrittenlacher, W.; Maahsen, H.; Arts, M.

    2003-04-01

    The amendment of the 21{sup st} Regulation on Air-Pollution Control dated 17.05.2002 describes continuous control of the function of gas recovery systems in gasoline stations by automatic control systems. Both systems available in the market (supplied by FAFNIR and TOKHEIM) were tested in extensive field tests. Both systems are ready for mass production. New dispensers are delivered with self control systems per production-type since 1.04.2003. Supplementary kits for the different dispenser types are available. (orig.)

  18. Nasa's International Space Station: A Testbed for Planetary Protection Protocol Development

    Science.gov (United States)

    Bell, M. S.; Rucker, M.; Love, S.; Johnson, J.; Chambliss, J.; Pierson, D.; Ott, M.; Mary, N.; Glass, B.; Lupisella, M.; hide

    2015-01-01

    Wherever humans go, they inevitably carry along the critters that live in and on them. Conventional wisdom has long held that it is unlikely those critters could survive the space environment, but in 2007 some microscopic aquatic animals called Tardigrades survived exposure to space and in 2008 Cyanobacteria lived for 548 days outside the ISS. Unlike the Mars rovers that were cleaned once and sent on their way, crew members will provide a constantly regenerating contaminant source. Are we prepared to certify that we can meet forward contamination protocols as we search for life at new destinations? What about the organisms we might reasonably expect a crewed spacecraft to leak or vent? Do we even know what they are? How long might our tiny hitch-hikers survive in close proximity to a warm spacecraft that periodically leaks/vents water or oxygen and how might they mutate with long-duration exposure? How will these contaminants migrate from their source in conditions encountered in space or on other planetary surfaces? This project aims to answer some of these questions by bringing together key stakeholder communities to develop a human forward contamination test, analysis, and integration plan. A system engineering approach to identify the experiments, analysis, and modeling needed to develop the contamination control protocols required will be used as a roadmap to integrate the many different parts of this problem - from launch to landing, living, and working on another planetary surface.

  19. Development and prospects of guidance system for operators in nuclear power station

    International Nuclear Information System (INIS)

    Aeba, Youichi

    1988-01-01

    In nuclear power plants, the information on plant process and the status of machinery and equipment is collected in a central control room, and operators watch the information and carry out the necessary operation according to circumstances, in this way, the stable safe operation is carried out. Recently, process parameters and the status of machinery and equipment are displayed, being classified by the objectives of monitoring, and when operators evaluate the condition of a plant, the burden of collecting required information is reduced, and the identification of the cause of abnormality and the forecast of the range of spread and the development of abnormality are eased. However, the burden of operators in the case of coping with the abnormal event in a plant is still heavy. In this report, the prospect of the operation-supporting system to which knowledge engineering is applied and the status of its development are described. The concept, system constitution, knowledge expression and inference control mechanism of the operation-supporting system, the test of the system and the results, and the perspective of the system hereafter are reported. (Kako, I.)

  20. Method of 16N generation for test of radiation controlled channels at nuclear power stations with water-cooled reactors

    International Nuclear Information System (INIS)

    Khryachkov, V.A.; Bondarenko, I.P.; Dvornikov, P.A.; Zhuravlev, B.V.; Kovtun, S.N.; Khromyleva, T.A.; Pavlov, A.V.; Roshchin, N.G.

    2012-01-01

    The preferences of nuclear reaction use for radiation control channels test in water-cooled power reactors have been analyzed in the paper. The new measurements for more accurate determination of reaction cross section energy dependence have been carried out. A set of new methods for background reducing and improvement of events determination reliability has also been developed [ru

  1. Development and testing of an objective structured clinical exam (OSCE) to assess socio-cultural dimensions of patient safety competency

    Science.gov (United States)

    Ginsburg, Liane R; Tregunno, Deborah; Norton, Peter G; Smee, Sydney; de Vries, Ingrid; Sebok, Stefanie S; VanDenKerkhof, Elizabeth G; Luctkar-Flude, Marian; Medves, Jennifer

    2015-01-01

    Background Patient safety (PS) receives limited attention in health professional curricula. We developed and pilot tested four Objective Structured Clinical Examination (OSCE) stations intended to reflect socio-cultural dimensions in the Canadian Patient Safety Institute's Safety Competency Framework. Setting and participants 18 third year undergraduate medical and nursing students at a Canadian University. Methods OSCE cases were developed by faculty with clinical and PS expertise with assistance from expert facilitators from the Medical Council of Canada. Stations reflect domains in the Safety Competency Framework (ie, managing safety risks, culture of safety, communication). Stations were assessed by two clinical faculty members. Inter-rater reliability was examined using weighted κ values. Additional aspects of reliability and OSCE performance are reported. Results Assessors exhibited excellent agreement (weighted κ scores ranged from 0.74 to 0.82 for the four OSCE stations). Learners’ scores varied across the four stations. Nursing students scored significantly lower (p<0.05) than medical students on three stations (nursing student mean scores=1.9, 1.9 and 2.7; medical student mean scores=2.8, 2.9 and 3.5 for stations 1, 2 and 3, respectively where 1=borderline unsatisfactory, 2=borderline satisfactory and 3=competence demonstrated). 7/18 students (39%) scored below ‘borderline satisfactory’ on one or more stations. Conclusions Results show (1) four OSCE stations evaluating socio-cultural dimensions of PS achieved variation in scores and (2) performance on this OSCE can be evaluated with high reliability, suggesting a single assessor per station would be sufficient. Differences between nursing and medical student performance are interesting; however, it is unclear what factors explain these differences. PMID:25398630

  2. The J-resistance curve Leak-before-Break test program on material for the Darlington Nuclear Generating Station

    International Nuclear Information System (INIS)

    Mukherjee, B.

    1988-01-01

    The Darlington Leak-Before-Break (DLBB) approach has been developed for large diameter (21, 22, 24 inch) SA106B heat transport (HT) piping and SA105 fittings as a design alternative to pipewhip restraints and in recognition of the questionable benefits of providing such restraints. Ontario Hydro's DLBB approach is based on the elastic plastic fracture mechanics method. In this test program, J-resistance curves were determined from actual pipe heats that were used in the construction of the Darlington heat transport systems (Units 1 and 2). Test blocks were prepared using four different welding procedures for nuclear Class I piping. The test program was designed to take into account the effect of various factors such as test temperature, crack plane orientation, welding effects, etc., which have influence on fracture properties. A total of 91 tests were conducted. An acceptable lower bound J-resistance curve for the piping steels was obtained by machining maximum thickness specimens from the pipes and by testing side grooved compact tension specimens. Test results showed that all pipes, welds and heat-affected zone materials within the scope of the DLBB program exhibited uppershelf toughness behaviour. All specimens showed high crack initiation toughness Jsub(lc), rising J-resistance curve and stable and ductile crack extension. Toughness of product forms depended on the direction of crack extension (circumferential versus axial crack orientation). Toughness of DLBB welds and parent materials at 250 0 C was lower than that at 20 0 C. (author)

  3. Space Station personal hygiene study

    Science.gov (United States)

    Prejean, Stephen E.; Booher, Cletis R.

    1986-01-01

    A personal hygiene system is currently under development for Space Station application that will provide capabilities equivalent to those found on earth. This paper addresses the study approach for specifying both primary and contingency personal hygiene systems and provisions for specified growth. Topics covered are system definition and subsystem descriptions. Subsystem interfaces are explored to determine which concurrent NASA study efforts must be monitored during future design phases to stay up-to-date on critical Space Station parameters. A design concept for a three (3) compartment personal hygiene facility is included as a baseline for planned test and verification activities.

  4. Development in cooling water intake and outfall systems for atomic or steam power stations

    International Nuclear Information System (INIS)

    Wada, Akira

    1987-01-01

    The condenser cooling water channel, in its functional aspects, is an important structure for securing a stable supply of cooling water. In its design it is necessary to give a thorough-going study to a reduction of ranges affected by discharged warm water and minimizing the effect of discharged water on navigating ships, and in its functional aspects as a structure for power generation, avoiding the recirculation of discharged warm water as well as to maintaining the operation of power stations in case of abnormalities (concentration of dirts owing to typhoons and floods, outbreak of a large amount of jellyfishes, etc.), and all these aspects must be reflected in the design of cooling water channel systems. In this paper, the present situation relating to the design of cooling water intake and outfall systems in Japan is discussed. (author). 10 figs

  5. Water-related constraints to the development of geothermal electric generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Robertson, R.C.; Shepherd, A.D.; Rosemarin, C.S.; Mayfield, M.W.

    1981-06-01

    The water-related constraints, which may be among the most complex and variable of the issues facing commercialization of geothermal energy, are discussed under three headings: (1) water requirements of geothermal power stations, (2) resource characteristics of the most promising hydrothermal areas and regional and local water supply situations, and (3) legal issues confronting potential users of water at geothermal power plants in the states in which the resource areas are located. A total of 25 geothermal resource areas in California, New Mexico, Oregon, Idaho, Utah, Hawaii, and Alaska were studied. Each had a hydrothermal resource temperature in excess of 150/sup 0/C (300/sup 0/F) and an estimated 30-year potential of greater than 100-MW(e) capacity.

  6. LLR data analysis and impact on lunar dynamics from recent developments at OCA LLR Station

    Science.gov (United States)

    Viswanathan, Vishnu; Fienga, Agnes; Courde, Clement; Torre, Jean-Marie; Exertier, Pierre; Samain, Etienne; Feraudy, Dominique; Albanese, Dominique; Aimar, Mourad; Mariey, Hervé; Viot, Hervé; Martinot-Lagarde, Gregoire

    2016-04-01

    Since late 2014, OCA LLR station has been able to range with infrared wavelength (1064nm). IR ranging provides both temporal and spatial improvement in the LLR observations. IR detection also permits in densification of normal points, including the L1 and L2 retroreflectors due to better signal to noise ratio. This contributes to a better modelisation of the lunar libration. The hypothesis of lunar dust and environmental effects due to the chromatic behavior noticed on returns from L2 retroreflector is discussed. In addition, data analysis shows that the effect of retroreflector tilt and the use of calibration profile for the normal point deduction algorithm, contributes to improving the precision of normal points, thereby impacting lunar dynamical models and inner physics.

  7. Applicability of AWJ technique for dismantling reactor of the Fukushima Daiichi Nuclear Power Station. Cutting test of imitation of fuel debris and optimization of the cutting condition

    International Nuclear Information System (INIS)

    Maruyama, Shin-ichiro; Watatani, Satoshi

    2016-01-01

    Based on findings during recovery works that followed the accident at Three Mile Island Station 2, it is assumed that the reactor internals at the Fukushima Daiichi Nuclear Power Station (1F) have complex geometries intermixed with melted fuel and confined in limited spaces. Accordingly, abrasive water jet (AWJ) cutting method is considered to be a promising technique that can be safely and reasonably used for cutting and removing reactor internals. The authors conducted tests to examine the possibility of application and to solve the problems of this technique. In the tests imitation of fuel debris and optimization of the cutting condition is used. The test result made the measures for some of the associated issues clear, and demonstrated that AWJ cutting method is assumed as one of the promising techniques for removing reactor internals. (author)

  8. Development of DCC software dynamic test facility: past and future

    International Nuclear Information System (INIS)

    McDonald, A.M.; Thai, N.D.; Buijs, W.J.

    1996-01-01

    This paper describes a test facility for future dynamic testing of DCC software used in the control computers of CANDU nuclear power stations. It is a network of three computers: the DCC emulator, the dynamic CANDU plant simulator and the testing computer. Shared network files are used for input/output data exchange between computers. The DCC emulator runs directly on the binary image of the DCC software. The dynamic CANDU plant simulator accepts control signals from the DCC emulator and returns realistic plant behaviour. The testing computer accepts test scripts written in AECL Test Language. Both dynamic test and static tests may be performed on the DCC software to verify control program outputs and dynamic responses. (author)

  9. The Twenty Statement Test in Teacher Development

    Directory of Open Access Journals (Sweden)

    Ahmet Aypay

    2011-10-01

    Full Text Available The purpose of this study is to describe teacher characteristics using Twenty Statements Test (TST. Study group includes a total of thirty-five individuals, including teachers, guidance and counselors and research assistants. The study used a qualitative approach on teacher identity. TST is one of the qualitative methods that were used to determine individual self-conceptualization. Study group were requested to write twenty statements that describe themselves responding to the question “Who I am?” in a free format. The findings indicated that teachers were overwhelmingly in group c (reflective. No differences were found in terms of gender and profession. Only few significant differences have been found based on marital status. The utility of TST in teacher training and development was discussed.

  10. The Twenty Statement Test in Teacher Development

    Directory of Open Access Journals (Sweden)

    Ahmet Aypay

    2011-04-01

    Full Text Available The purpose of this study is to describe teacher characteristics using Twenty Statements Test (TST. Study group includes a total of thirty-five individuals, including teachers, guidance and counselors and research assistants. The study used a qualitative approach on teacher identity. TST is one of the qualitative methods that were used to determine individual self-conceptualization. Study group were requested to write twenty statements that describe themselves responding to the question “Who I am?” in a free format. The findings indicated that teachers were overwhelmingly in group c (reflective. No differences were found in terms of gender and profession. Only few significant differences have been found based on marital status. The utility of TST in teacher training and development was discussed

  11. Study of the mechanical properties of the electric power station components: the punch test; Etude des proprietes mecaniques des composants de centrales thermiques: l'essai punch test

    Energy Technology Data Exchange (ETDEWEB)

    Isselin, J

    2003-03-15

    The aging of the electric production park implies an increasing need of knowledge concerning the evolution of the mechanical properties of its components. With regard to this problem, the availability in material is more and more small. This work proposes to characterize these properties through a mechanical test called Punch test. The main characteristic of this test is to use very small volume samples. The development of this test has been carried out by the study of a 15 MDV 4-05 steel coming from a steam drum of a thermal power plant after 145000 hours of service. At first, we have measured the influence of the parameters of this test. Then, the study has dealt more particularly on the transition temperature of the material. With the finite element simulation method, the strain hardening coefficient of the material has been determined. (O.M.)

  12. Development of a numerical pump testing framework.

    Science.gov (United States)

    Kaufmann, Tim A S; Gregory, Shaun D; Büsen, Martin R; Tansley, Geoff D; Steinseifer, Ulrich

    2014-09-01

    It has been shown that left ventricular assist devices (LVADs) increase the survival rate in end-stage heart failure patients. However, there is an ongoing demand for an increased quality of life, fewer adverse events, and more physiological devices. These challenges necessitate new approaches during the design process. In this study, computational fluid dynamics (CFD), lumped parameter (LP) modeling, mock circulatory loops (MCLs), and particle image velocimetry (PIV) are combined to develop a numerical Pump Testing Framework (nPTF) capable of analyzing local flow patterns and the systemic response of LVADs. The nPTF was created by connecting a CFD model of the aortic arch, including an LVAD outflow graft to an LP model of the circulatory system. Based on the same geometry, a three-dimensional silicone model was crafted using rapid prototyping and connected to an MCL. PIV studies of this setup were performed to validate the local flow fields (PIV) and the systemic response (MCL) of the nPTF. After validation, different outflow graft positions were compared using the nPTF. Both the numerical and the experimental setup were able to generate physiological responses by adjusting resistances and systemic compliance, with mean aortic pressures of 72.2-132.6 mm Hg for rotational speeds of 2200-3050 rpm. During LVAD support, an average flow to the distal branches (cerebral and subclavian) of 24% was found in the experiments and the nPTF. The flow fields from PIV and CFD were in good agreement. Numerical and experimental tools were combined to develop and validate the nPTF, which can be used to analyze local flow fields and the systemic response of LVADs during the design process. This allows analysis of physiological control parameters at early development stages and may, therefore, help to improve patient outcomes. Copyright © 2014 International Center for Artificial Organs and Transplantation and Wiley Periodicals, Inc.

  13. Development of the Science Data System for the International Space Station Cold Atom Lab

    Science.gov (United States)

    van Harmelen, Chris; Soriano, Melissa A.

    2015-01-01

    Cold Atom Laboratory (CAL) is a facility that will enable scientists to study ultra-cold quantum gases in a microgravity environment on the International Space Station (ISS) beginning in 2016. The primary science data for each experiment consists of two images taken in quick succession. The first image is of the trapped cold atoms and the second image is of the background. The two images are subtracted to obtain optical density. These raw Level 0 atom and background images are processed into the Level 1 optical density data product, and then into the Level 2 data products: atom number, Magneto-Optical Trap (MOT) lifetime, magnetic chip-trap atom lifetime, and condensate fraction. These products can also be used as diagnostics of the instrument health. With experiments being conducted for 8 hours every day, the amount of data being generated poses many technical challenges, such as downlinking and managing the required data volume. A parallel processing design is described, implemented, and benchmarked. In addition to optimizing the data pipeline, accuracy and speed in producing the Level 1 and 2 data products is key. Algorithms for feature recognition are explored, facilitating image cropping and accurate atom number calculations.

  14. Development of Testing Methodologies to Evaluate Postflight Locomotor Performance

    Science.gov (United States)

    Mulavara, A. P.; Peters, B. T.; Cohen, H. S.; Richards, J. T.; Miller, C. A.; Brady, R.; Warren, L. E.; Bloomberg, J. J.

    2006-01-01

    Crewmembers experience locomotor and postural instabilities during ambulation on Earth following their return from space flight. Gait training programs designed to facilitate recovery of locomotor function following a transition to a gravitational environment need to be accompanied by relevant assessment methodologies to evaluate their efficacy. The goal of this paper is to demonstrate the operational validity of two tests of locomotor function that were used to evaluate performance after long duration space flight missions on the International Space Station (ISS).

  15. Technical evaluation of the noise and isolation testing of the safety features actuation system at the Davis Besse Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1981-07-01

    This report documents the technical evaluation of the noise and isolation testing of the safety features actuation system at the Davis Besse Nuclear Power Station, Unit 1. The tests were to verify that faults on the non-Class 1E circuits would not propagate to the Class 1E circuits and degrade them below acceptable levels. The tests conducted demonstrated that the safety features actuation system did not degrade below acceptable levels nor was the system's ability to perform its protective functions affected

  16. Preparedness of fire safety in underground train station: Comparison between train operators in Malaysia with other operators from the developed countries

    Science.gov (United States)

    Tajedi, Noor Aqilah A.; Sukor, Nur Sabahiah A.; Ismail, Mohd Ashraf M.; Shamsudin, Shahrul A.

    2017-10-01

    The purpose of this paper is to compare the fire evacuation plan and preparation at the underground train stations in the different countries. The methodology for this study was using the extended questionnaire survey to investigate the Rapid Rail Sdn Bhd, Malaysia's fire safety plan and preparation at the underground train stations. There were four sections in the questionnaire which included (i) background of the respondents, (ii) the details on the train stations, safety instruction and fire evacuation exercises (iii) technical systems, installation and equipment at the underground stations and (iv) procedures and technical changes related to fire safety that had been applied by the operators. Previously, the respondents from the different train operator services in the developed countries had completed the questionnaires. This paper extends the response from the Rapid Rail Sdn Bhd to compare the emergency procedures and preparation for fire event with the developed countries. As a result, this study found that the equipment and facilities that provided at the underground train stations that operated by Rapid Rail are relevant for fire safety procedures and needs. The main advantage for Rapid Rail is the underground stations were designed with two or more entrances/exits that may perform better evacuation compare to one main entrance/exit train stations in the other developed countries.

  17. Space station data system analysis/architecture study. Task 2: Options development, DR-5. Volume 2: Design options

    Science.gov (United States)

    1985-01-01

    The primary objective of Task 2 is the development of an information base that will support the conduct of trade studies and provide sufficient data to make key design/programmatic decisions. This includes: (1) the establishment of option categories that are most likely to influence Space Station Data System (SSDS) definition; (2) the identification of preferred options in each category; and (3) the characterization of these options with respect to performance attributes, constraints, cost and risk. This volume contains the options development for the design category. This category comprises alternative structures, configurations and techniques that can be used to develop designs that are responsive to the SSDS requirements. The specific areas discussed are software, including data base management and distributed operating systems; system architecture, including fault tolerance and system growth/automation/autonomy and system interfaces; time management; and system security/privacy. Also discussed are space communications and local area networking.

  18. Strip reduction testing of lubricants developed during ENFORM project

    DEFF Research Database (Denmark)

    Gazvoda, S.; Andreasen, Jan Lasson; Olsson, David Dam

    Strip reduction testing of lubricants developed during ENFORM project. Experiments were conducted with the strip reduction test [1] in order to classify experimental lubricants, developed during concerned project. One reference lubricant was used during testing....

  19. Fuel Cell Development and Test Laboratory | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL Fuel Cell Development and Test Laboratory Fuel Cell Development and Test Laboratory The Energy System Integration Facility's Fuel Cell Development and Test Laboratory supports fuel cell research and development projects through in-situ fuel cell testing. Photo of a researcher running

  20. Development of lubricant test for punching and blanking

    DEFF Research Database (Denmark)

    Olsson, David Dam

    2001-01-01

    The background for development of new lubricants Requirements to lubricant test for punching Methods of evaluating lubricants Test equipment developed at DTU Conclusion.......The background for development of new lubricants Requirements to lubricant test for punching Methods of evaluating lubricants Test equipment developed at DTU Conclusion....

  1. Radiological survey of the area surrounding the National Reactor Testing Station, Idaho Falls, Idaho. Date of survey: 1 and 2 February 1972

    International Nuclear Information System (INIS)

    1974-01-01

    The Aerial Radiological Measuring System (ARMS) was used to survey the National Reactor Testing Station (NRTS) during February 1972. The purpose of the survey was primarily to identify the presence of Ru-106 and Rh-106 in a release from the Chemical Processing Plant at NRTS. Additionally, the gamma-ray terrestrial exposure rate levels were mapped and the distribution of any man-made isotopes was located and defined

  2. Small zeolite column tests for removal of cesium from high radioactive contaminated water in Fukushima Daiichi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hijikata, Takatoshi; Uozumi, Koichi; Tukada, Takeshi; Koyama, Tadafumi; Ishikawa, Keiji; Ono, Shoichi; Suzuki, Shunichi; Denton, Mark; Raymont, John

    2011-01-01

    After the earthquake on March 11th 2011, a large amount (more than 0.12 million m 3 ) of highly radioactive contaminated water had pooled in Fukushima Daiichi nuclear power station. As an urgent issue, highly radioactive nuclides should be removed from this contaminated water to reduce radioactivity in the turbine buildings and nuclear reactor buildings. Removal of Cs from this contaminated water is a key issue, because 134 Cs and 137 Cs are highly radioactive γ-emitting nuclides. The zeolite column system was used for Cs and Sr removal from the radioactive water of Three-Mile Island Unit 2, and modified columns were then developed as a Cs removal method for high-level radioactive water in US national laboratories (WRSC, ORNL, PNNL, Hanford, etc.). In order to treat Fukushima's highly contaminated water with a similar system, it was necessary to understand the properties of zeolite to remove Cs from sea salt as well as the applicability of the column system to a high throughput of around 1200 m 3 /d. The kinetic characteristics of the column were another property to be understood before actual operation. Hence, a functional small-scale zeolite column system was installed in CRIEPI for conducting the experiments to understand decontamination behaviors. Each column has a 2- or 3-cm inner diameter and a 12-cm height, and 12 g of zeolite-type media was packed into the column. The column experiments were carried out with Kurion-zeolite, Herschelite, at different feed rates of simulated water with different concentrations of Cs and sea salt. As for the water with 4 ppm Cs and 0 ppm sea salt, only a 10% Cs concentration was observed in the effluent after 20,000 bed volumes were fed at a rate of 33 cm/min, which corresponds to the actual system. On the other hand, a 40% Cs concentration was observed in the effluent after only 50 bed volumes were passed for water with 2 ppm Cs and 3.4 wt.% sea salt at a feed rate of 34 cm/min. As the absorption of Cs is hampered by the

  3. Development of Multichannel Eddy Current Testing Instrument

    International Nuclear Information System (INIS)

    Lee, Hee Jong; Cho, Chan Hee; Nam, Min Woo; Yoon, Byung Sik; Yoo, Hyun Joo

    2010-01-01

    Four main techniques of electromagnetic testing are used for commercial applications: eddy current testing, alternating current field testing, magnetic flux leakage testing and remote field testing. Eddy current testing is a nondestructive evaluation method, which makes eddy current flow on a specimen by applying driving pulse to eddy current probe coil, by using eddy current testing device, and makes the change of eddy current which is dependently caused by flaws, material characteristics, testing condition, receiving through eddy current, and analyzes material properties, flaws, status on the specimen. Application of EC instrumentation varies widely in industry from the identification of metal heat treatment to the inspection of steam generator tubing in nuclear power plants. In this study, we have designed multichannel EC instrument which can be applicable to the NDE of the tube in heat exchanger for electric power facility, chemistry, and military industry, and finally confirmed the proper function of EC instrumentation

  4. Involving Students in Developing Math Tests

    Science.gov (United States)

    Rapke, Tina

    2017-01-01

    Many studies have claimed that traditional testing actually promotes students' use of superficial approaches to learning. When preparing to take tests, students typically memorize and cram rather than understanding the material and gaining new perspectives. This article describes how the author recast traditional tests by having students take a…

  5. Amtrak Stations

    Data.gov (United States)

    Department of Homeland Security — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  6. IEEE Std 381-1977: IEEE standard criteria for type tests of Class 1E modules used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes the basic requirements of a type test program with the objective of verifying that a module used as Class 1E equipment in a nuclear power generating station meets or exceeds its design specifications. This document is limited to class 1E modules from and including the sensor through the logic circuitry of the final actuation devices. Except for those that are part of a module, switchgear, cables, connections, motors, valve actuators, station batteries, and penetrations are not included and are covered by other IEEE documents. The purpose of this document is to supplement the procedures and requirements given in IEEE Std 323-1974 [24] for type testing Class 1E modules, thereby providing directions for establishment of a type test program which will obtain the required test data and yield the required documentation of test methods and results. This standard is structured to present to the user the principal performance characteristics and environmental parameters which must be considered in designing a type test program for any give Class 1E module. These modules range from tiny sensors to complete racks or cabinets full of equipment that may be located inside or outside containment. The Class 1E modules are required to perform their function before, during, or after, or all, any design basis event specified for the module. The vast variety of modules covered by this document precludes the listing here of specific requirements for each type test

  7. Space Station Furnace Facility Management Information System (SSFF-MIS) Development

    Science.gov (United States)

    Mead, Robert M.

    1996-01-01

    Thios report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. Attachment A contains additions, corrections, and deletions by the COTR.

  8. THE STRUCTRUE PRINCIPLE AND DEVELOPMENT ANALYSIS OF TOTAL STATION%全站仪结构原理与发展分析

    Institute of Scientific and Technical Information of China (English)

    王刚

    2013-01-01

    全站仪作为当前最常用的测量仪器,在测量工作中有着不可或缺的地位。为了更好地掌握全站仪,使用全站仪,有必要了解全站仪的结构及其发展方向,在工程许可下进一步提高全站仪的利用率。本文在介绍全站仪的特点、功能、精度等级划分及结构原理的基础上,重点研究了全站仪在当今测量工作中的现状、前景及发展方向。%The total station as the most commonly used measuring instrument,plays an indispensable role in the measurement work. In order to grasp the total station instrument better,using total station,we need to understand the structure and development direction of total station instrument,in which further improve the utilization of the total station instrument engineering approval rate.In this paper,the characteristics of the function of total station instrument,the accuracy of classification and structure principle and so on,current situation,focus on the total station in the surveying work in the future and developing direction.

  9. Development of Technique for Testing the Long-Term Stability of Silicon Microstrip Detectors

    International Nuclear Information System (INIS)

    Kosinov, A.V.; Maslov, N.I.; Naumov, S.V.; Ovchinnik, V.D.; Starodubtsev, A.F.; Vasiliev, G.P.; Yalovenko, V.I.; Bosisio, L.

    2006-01-01

    An automatic multi-channel set-up prototype for simultaneous testing of the Long-Term Stability (LTS) of more than ten detectors is described. The Inner Tracking System of the ALICE experiment will include about two thousand Double-sided Microstrip Detectors (DSMD). Efficient automatic measurement techniques are crucial for the LTS test, because the corresponding test procedure should be performed on each detector and requires long time, at least two days. By using special adapters for supporting and connecting the bare DSMDs, failing detectors can be screened out before module assembly, thus minimizing the cost. Automated probe stations developed for a special purpose or for microelectronics industry are used for measuring physical static DSMD characteristics and check good-to-bad elements ratio for DSMD. However, automated (or semi-automatic)test benches for studying LTS or testing DSMD long-term stability before developing a detecting module are absent

  10. Human factors in equipment development for the Space Shuttle - A study of the general purpose work station

    Science.gov (United States)

    Junge, M. K.; Giacomi, M. J.

    1981-01-01

    The results of a human factors test to assay the suitability of a prototype general purpose work station (GPWS) for biosciences experiments on the fourth Spacelab mission are reported. The evaluation was performed to verify that users of the GPWS would optimally interact with the GPWS configuration and instrumentation. Six male subjects sat on stools positioned to allow assimilation of the zero-g body posture. Trials were run concerning the operator viewing angles facing the console, the console color, procedures for injecting rates with dye, a rat blood cell count, mouse dissection, squirrel monkey transfer, and plant fixation. The trials were run for several days in order to gage improvement or poor performance conditions. Better access to the work surface was found necessary, together with more distinct and better located LEDs, better access window latches, clearer sequences on control buttons, color-coded sequential buttons, and provisions made for an intercom system when operators of the GPWS work in tandem.

  11. Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Doctor, S.R.; Smith, B.W.; Gore, B.F.

    1993-01-01

    As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants

  12. Development of remote decontamination technologies improving internal environment of reactor buildings at Fukushima Daiichi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hotta, Koji; Hayashi, Hirotada; Sakai, Hitoshi

    2016-01-01

    The reactor buildings at the Fukushima Daiichi Nuclear Power Station of Tokyo Electric Power Co., Inc., which was seriously damaged by the Great East Japan Earthquake of March 11, 2011, have been highly contaminated by radioactive materials. To safely and efficiently advance the processes related to the forthcoming decommissioning of the reactors, it is necessary to improve the hazardous environment inside the reactor buildings. During the more than four years that have elapsed since the Great East Japan Earthquake, Toshiba has been implementing various measures to reduce the ambient dose rates inside the reactor buildings through decontamination work and participation in a national project for the development of remote decontamination technologies for reactor buildings. A variety of vehicles and technologies to support decontamination work have been developed through these activities, and are significantly contributing to improvement of the environment inside the reactor buildings. (author)

  13. SMART Rotor Development and Wind Tunnel Test

    Science.gov (United States)

    2009-09-01

    amplifier and control system , and data acquisition, processing, and display systems . Boeing�s LRTS (Fig. 2), consists of a sled structure that...Support Test Stand Sled Tail Sting Outrigger Arm Figure 2: System integration test at whirl tower Port Rotor Balance Main Strut Flap Tail...demonstrated. Finally, the reliability of the flap actuation system was successfully proven in more than 60 hours of wind tunnel testing

  14. FMIT test-end instrumentation development bases

    International Nuclear Information System (INIS)

    Fuller, J.L.

    1982-06-01

    FMIT test-end measurements proposed for deuteron beam control, target diagnostics, and irradiation sample dosimetry are listed. The test-end refers to the area inside the test cell, but includes measurements inside and outside the cell. Justification, categorization, and limits qualification are presented for each measurement. Methods are purposefully de-emphasized in order to clarify the measurement needs, not techniques. Some discussion of techniques currently under investigation is given in the last section of the report

  15. LiquidPower-1. Development and proof-of-concept of core methanol reformer for stationary and motive fuel cell systems and hydrogen refuelling stations. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Krogsgaard, J.; Mortensen, Henrik [H2 Logic A/S, Herning (Denmark); Skipper, T. [Dantherm Power A/S, Hobro (Denmark)

    2013-03-15

    LiquidPower-1 has developed laboratory test systems for methanol reforming and tested reformers from four different suppliers. This has contributed to determining the state-of-the-art level for methanol reforming and enabled an update of the LiquidPower R and D Roadmap onwards a commercialisation of the technology. The project has achieved the following results: 1) A detailed technical specification of methanol reformers for the fuel cell back-up power and hydrogen refueling station markets has been conducted; 2) Laboratory test systems for methanol reformers has been developed and established at Dantherm Power and H2 Logic; 3) Initial test of reformers from four suppliers has been conducted - with two suppliers being selected for continued tests; 4) Extensive laboratory tests conducted of reformers from two suppliers, with the aim to determine state-of-the-art for price, efficiency, capacity and lifetime. Several errors and break-downs were experienced during the test period, which revealed a need for further R and D to improve lifetime and stability; 5) The LiquidPower F and U Roadmap has been updated. Reformer TCO targets (Total Cost of Operation) for each of the markets have been calculated including updated targets for efficiency and cost. These targets also serve as the main ones to be pursued as part of the continued R and D roadmap execution. Compared to the previous edition of the Roadmap, the project has confirmed the viability of methanol reforming, but also revealed that stability and lifetime needs to be addressed and solved before commencing commercialization of the technology. If the Roadmap is successful a commercialization can commence beyond 2015. (Author)

  16. Development of non-destructive testing

    International Nuclear Information System (INIS)

    Park, D.Y.; Moon, Y.S.; Lim, B.K.

    1980-01-01

    Various standard test samples were made for eddy current test last year ('78) and several probes of eddy current test were fabricated this year ('79). The result of some basic experiments using these probes is described in this report. A EM 3300 Multitester (made by Automation Industries, U.S.A.) was purchased, which is the fundamental instrument for the examinations of steam generator U-tubes of nuclear power plant. After some necessary experiments had been performed with this instrument, we have participated in the first inservice inspection of KORI-1 nuclear power plant (Nov., '79) and accumulated much technical experiences. Some of its test results are described in this report. (author)

  17. Interim report spent nuclear fuel retrieval system fuel handling development testing

    Energy Technology Data Exchange (ETDEWEB)

    Ketner, G.L.; Meeuwsen, P.V.; Potter, J.D.; Smalley, J.T.; Baker, C.P.; Jaquish, W.R.

    1997-06-01

    Fuel handling development testing was performed in support of the Fuel Retrieval System (FRS) Sub-Project at the Hanford Site. The project will retrieve spent nuclear fuel, clean and remove fuel from canisters, repackage fuel into baskets, and load fuel into a multi-canister overpack (MCO) for vacuum drying and interim dry storage. The FRS is required to retrieve basin fuel canisters, clean fuel elements sufficiently of uranium corrosion products (or sludge), empty fuel from canisters, sort debris and scrap from whole elements, and repackage fuel in baskets in preparation for MCO loading. The purpose of fuel handling development testing was to examine the systems ability to accomplish mission activities, optimization of equipment layouts for initial process definition, identification of special needs/tools, verification of required design changes to support performance specification development, and validation of estimated activity times/throughput. The test program was set up to accomplish this purpose through cold development testing using simulated and prototype equipment; cold demonstration testing using vendor expertise and systems; and graphical computer modeling to confirm feasibility and throughput. To test the fuel handling process, a test mockup that represented the process table was fabricated and installed. The test mockup included a Schilling HV series manipulator that was prototypic of the Schilling Hydra manipulator. The process table mockup included the tipping station, sorting area, disassembly and inspection zones, fuel staging areas, and basket loading stations. The test results clearly indicate that the Schilling Hydra arm cannot effectively perform the fuel handling tasks required unless it is attached to some device that can impart vertical translation, azimuth rotation, and X-Y translation. Other test results indicate the importance of camera locations and capabilities, and of the jaw and end effector tool design. 5 refs., 35 figs., 3 tabs.

  18. Modeling and analysis of selected organization for economic cooperation and development PKL-3 station blackout experiments using TRACE

    Directory of Open Access Journals (Sweden)

    Roman Mukin

    2018-04-01

    Full Text Available A series of tests dedicated to station blackout (SBO accident scenarios have been recently performed at the Primärkreislauf-Versuchsanlage (primary coolant loop test facility; PKL facility in the framework of the OECD/NEA PKL-3 project. These investigations address current safety issues related to beyond design basis accident transients with significant core heat up. This work presents a detailed analysis using the best estimate thermal–hydraulic code TRACE (v5.0 Patch4 of different SBO scenarios conducted at the PKL facility; failures of high- and low-pressure safety injection systems together with steam generator (SG feedwater supply are considered, thus calling for adequate accident management actions and timely implementation of alternative emergency cooling procedures to prevent core meltdown. The presented analysis evaluates the capability of the applied TRACE model of the PKL facility to correctly capture the sequences of events in the different SBO scenarios, namely the SBO tests H2.1, H2.2 run 1 and H2.2 run 2, including symmetric or asymmetric secondary side depressurization, primary side depressurization, accumulator (ACC injection in the cold legs and secondary side feeding with mobile pump and/or primary side emergency core coolant injection from the fuel pool cooling pump. This study is focused specifically on the prediction of the core exit temperature, which drives the execution of the most relevant accident management actions. This work presents, in particular, the key improvements made to the TRACE model that helped to improve the code predictions, including the modeling of dynamical heat losses, the nodalization of SGs' heat exchanger tubes and the ACCs. Another relevant aspect of this work is to evaluate how well the model simulations of the three different scenarios qualitatively and quantitatively capture the trends and results exhibited by the actual experiments. For instance, how the number of SGs considered for

  19. Development of research reactor simulator and its application to dynamic test-bed

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Baang, Dane; Park, Jae-Chang; Lee, Seung-Wook; Bae, Sung Won

    2014-01-01

    We developed a real-time simulator for 'High-flux Advanced Neutron Application ReactOr (HANARO), and the Jordan Research and Training Reactor (JRTR). The main purpose of this simulator is operator training, but we modified this simulator into a dynamic test-bed (DTB) to test the functions and dynamic control performance of reactor regulating system (RRS) in HANARO or JRTR before installation. The simulator hardware consists of a host computer, 6 operator stations, a network switch, and a large display panel. The software includes a mathematical model that implements plant dynamics in real-time, an instructor station module that manages user instructions, and a human machine interface module. The developed research reactor simulators are installed in the Korea Atomic Energy Research Institute nuclear training center for reactor operator training. To use the simulator as a dynamic test-bed, the reactor regulating system modeling software of the simulator was replaced by actual RRS cabinet, and was interfaced using a hard-wired and network-based interface. RRS cabinet generates control signals for reactor power control based on the various feedback signals from DTB, and the DTB runs plant dynamics based on the RRS control signals. Thus the Hardware-In-the-Loop Simulation between RRS and the emulated plant (DTB) has been implemented and tested in this configuration. The test result shows that the developed DTB and actual RRS cabinet works together simultaneously resulting in quite good dynamic control performances. (author)

  20. A test facility for the international linear collider at SLAC end station a for prototypes of beam delivery and IR components

    International Nuclear Information System (INIS)

    Hildreth, M.D.; Erickson, R.; Frisch, J.

    2006-01-01

    The SLAC Linac can deliver damped bunches with ILC parameters for bunch charge and bunch length to End Station A. A 10Hz beam at 28.5 GeV energy can be delivered there, parasitic with PEP-II operation. We plan to use this facility to test prototype components of the Beam Delivery System and Interaction Region. We discuss our plans for this ILC Test Facility and preparations for carrying out experiments related to collimator wakefields and energy spectrometers. We also plan an interaction region mockup to investigate effects from backgrounds and beam-induced electromagnetic interference. (author)

  1. Developing MESA : an accelerated reliability test

    NARCIS (Netherlands)

    Baskoro, G.; Rouvroye, J.L.; Bacher, W.; Brombacher, A.C.

    2003-01-01

    This paper describes the on-going research on an accelerated reliability test strategy called MESA (Multiple Environment Stress Analysis) intended to find in a fast and efficient manner (potential) reliability problems during the design phase of high volume consumer products. This test has shown

  2. Current Research/Development in Language Testing.

    Science.gov (United States)

    Oller, John W., Jr.

    A discussion of language testing looks at the relationship between the processes of language learning and language testing, particularly from the point of view of pragmatics theory. It outlines some of the theory of Charles Sanders Pierce and its role in the evolution of linguistic theory, as well as the work of other theorists concerning the…

  3. Marihuana contact test, evaluation and development

    Science.gov (United States)

    1976-02-01

    A colorimetric swab test for detecting human contact with marihuana was evaluated. The test was found to be capable of detecting only 83% of marihuana smokers immediately after smoking and was also demonstrated to be subject to a wide range of possib...

  4. SLAC physicists develop test for string theory

    CERN Multimedia

    Yajnik, Juhi

    2006-01-01

    "Under certain conditions, string theory solves many of the questions wracking the minds of physicists, but until recently it had one major flaw - it could not be tested. SLAC (Stanford Linear Accelerator Center) scientists have found a way to test this revolutionary theory, which posits that there are 10 or 11 dimensions in our universe" (1 page)

  5. Engineer Research and Development Center's Materials Testing Center (MTC)

    Data.gov (United States)

    Federal Laboratory Consortium — The Engineer Research and Development Center's Materials Testing Center (MTC) is committed to quality testing and inspection services that are delivered on time and...

  6. Microbiological Tests Performed During the Design of the International Space Station Environmental Control and Life Support Systems. Part 1, Bulk Phase. Part 1; Bulk Phase

    Science.gov (United States)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    The design and manufacturing of the main Environmental Control and Life Support Systems (ECLSS) for the United States segments of the International Space Station (ISS) was an involved process that started in the mid 1980s, with the assessment and testing of competing technologies that could be used to clean the air and recycle water. It culminated in 2009 with the delivery and successful activation of the Water Recovery System (WRS) water processor (WP). The ECLSS required the work of a team of engineers and scientist working together to develop systems that could clean and/or recycle human metabolic loads to maintain a clean atmosphere and provide the crew clean water. One of the main goals of the ECLSS is to minimize the time spent by the crew worrying about vital resources not available in the vacuum of space, which allows them to spend most of their time learning to live in a microgravity environment many miles from the comforts of Earth and working on science experiments. Microorganisms are a significant part of the human body as well as part of the environment that we live in. Therefore, the ISS ECLSS design had to take into account the effect microorganisms have on the quality of stored water and wastewater, as well as that of the air systems. Hardware performance issues impacted by the accumulation of biofilm and/or microbiologically influenced corrosion were also studied during the ECLSS development stages. Many of the tests that were performed had to take into account the unique aspects of a microgravity environment as well as the challenge of understanding how to design systems that could not be sterilized or maintained in a sterile state. This paper will summarize the work of several studies that were performed to assess the impacts and/or to minimize the effects of microorganisms in open, semi-closed and closed loop life support system. The biofilm and biodeterioration studies that were performed during the design and test periods will be presented in

  7. Development of Partial Discharging Simulation Test Equipment

    Science.gov (United States)

    Kai, Xue; Genghua, Liu; Yan, Jia; Ziqi, Chai; Jian, Lu

    2017-12-01

    In the case of partial discharge training for recruits who lack of on-site work experience, the risk of physical shock and damage of the test equipment may be due to the limited skill level and improper operation by new recruits. Partial discharge simulation tester is the use of simulation technology to achieve partial discharge test process simulation, relatively true reproduction of the local discharge process and results, so that the operator in the classroom will be able to get familiar with and understand the use of the test process and equipment.The teacher sets up the instrument to display different partial discharge waveforms so that the trainees can analyze the test results of different partial discharge types.

  8. The Solid Waste Transfer Pit an FFTF [Fast Flux Test Facility] station for fuel and reflector transfer

    International Nuclear Information System (INIS)

    Milewski, A.J.; Thomson, J.D.

    1985-01-01

    This paper describes the design aspects of a proposed FFTF facility called the Solid Waste Transfer Pit (SWTP). This new facility will be used as a transfer station for reflectors and/or low decay heat fuel assemblies when movement from the Fuel Storage Facility for sodium removal and subsequent reprocessing is to be accomplished. The SWTP utilizes a shielded cell cover with an integral manually-operated gate valve for top loading of a transfer vessel. The cost-effective design discussed herein provides a practical approach using state-of-the-art concepts while assuring safe and reliable operation

  9. Pore Formation and Mobility Investigation (PFMI): Concept, Hardware Development, and Initial Analysis of Experiments Conducted Aboard the International Space Station

    Science.gov (United States)

    Grugel, Richard N.

    2003-01-01

    Porosity in the form of "bubbles and pipes" can occur during controlled directional solidification processing of metal alloys. This is a consequence that 1) precludes obtaining any meaningful scientific results and 2) is detrimental to desired material properties. Unfortunately, several Microgravity experiments have been compromised by porosity. The intent of the PFMl investigation is to conduct a systematic effort directed towards understanding porosity formation and mobility during controlled directional solidification (DS) in a microgravity environment. PFMl uses a pure transparent material, succinonitrile (SCN), as well as SCN "alloyed" with water, in conjunction with a translating temperature gradient stage so that direct observation and recording of pore generation and mobility can be made. PFMl is investigating the role of thermocapillary forces and temperature gradients in affecting bubble dynamics as well as other solidification processes in a microgravity environment. This presentation will cover the concept, hardware development, operations, and the initial results from experiments conducted aboard the International Space Station.

  10. Common Data Acquisition Systems (DAS) Software Development for Rocket Propulsion Test (RPT) Test Facilities - A General Overview

    Science.gov (United States)

    Hebert, Phillip W., Sr.; Hughes, Mark S.; Davis, Dawn M.; Turowski, Mark P.; Holladay, Wendy T.; Marshall, PeggL.; Duncan, Michael E.; Morris, Jon A.; Franzl, Richard W.

    2012-01-01

    The advent of the commercial space launch industry and NASA's more recent resumption of operation of Stennis Space Center's large test facilities after thirty years of contractor control resulted in a need for a non-proprietary data acquisition system (DAS) software to support government and commercial testing. The software is designed for modularity and adaptability to minimize the software development effort for current and future data systems. An additional benefit of the software's architecture is its ability to easily migrate to other testing facilities thus providing future commonality across Stennis. Adapting the software to other Rocket Propulsion Test (RPT) Centers such as MSFC, White Sands, and Plumbrook Station would provide additional commonality and help reduce testing costs for NASA. Ultimately, the software provides the government with unlimited rights and guarantees privacy of data to commercial entities. The project engaged all RPT Centers and NASA's Independent Verification & Validation facility to enhance product quality. The design consists of a translation layer which provides the transparency of the software application layers to underlying hardware regardless of test facility location and a flexible and easily accessible database. This presentation addresses system technical design, issues encountered, and the status of Stennis' development and deployment.

  11. Development of filtered containment venting system and application for Kashiwazaki-Kariwa Nuclear Power Station Unit 6, 7

    International Nuclear Information System (INIS)

    Murai, Soutarou; Hiranuma, Naoki; Kimura, Takeo; Omori, Shuichi; Watanabe, Fumitoshi; Sasa, Daisuke

    2014-01-01

    The Fukushima Dai-ichi Nuclear Power Station (1F) of Tokyo Electric Power Company (TEPCO) had experienced severe radio-active release to the environment in the Tohoku Region Pacific Coast Earthquake (alias: the Great East Japan Earthquake) in 2011. Under the Station Black-Out (SBO) conditions caused by tsunami with the earthquake, the 1F operators had tried to vent the gasses in the Primary Containment Vessels (PCVs) of the unit 1, 2 and 3 to the environment through the water pools in the suppression chambers of the PCVs. Its venting, however, was imperfect and, as a result, major direct radio-active release to the environment was caused. After this disaster, TEPCO launched a project to develop the Filtered Containment Venting System (FCVS), in which our very bitter experiences in the 1F accident as described above are reflected. One of the main purposes of the development of the FCVS is to enhance operability of venting under the severe plant conditions such as the SBO during progressing of severe core damage, and another is to enhance removal performance of radio-nuclides with the newly added filtering equipment, which is installed in the venting line from the PCV to the outer. The Kashiwazaki-Kariwa NPS unit 6 and 7 will be the first reactors applied the FCVSs. In this paper, we show the design concept of the TEPCO's FCVS, the brief overview of the system design and the summary of experiment which has been performed for getting the performance data of the FCVS such as decontamination factor in various conditions. (author)

  12. Expansive development of a decommissioning program 'recycle simulator' in nuclear power station

    International Nuclear Information System (INIS)

    Nishiuchi, T.; Ozaki, S.; Hironaga, M.

    2004-01-01

    A decommissioning program 'Recycle Simulator' should be put into practice in careful consideration of both recycle of non-radioactive wastes and reduce of radioactive wastes in the coming circulatory social system. Nevertheless current support systems for decommissioning planning mainly deal with decontamination, safety storage and dismantlement, so-called the prior part of the total decommissioning process. Authors emphasize the necessity of total planning of decommissioning including recycle or reuse of a large amount of demolition materials and are propelling the development of the multi expert system named 'Recycle Simulator'. This paper presents an algorithm of the recycling and reusing scenario of demolition materials and a summarized configuration. 'Recycle Simulator' for the demolished concrete was developed in 2000 and presented at a previous International Conference on Nuclear Engineering. Construction of a supporting multi expert system for the totally planning of decommissioning projects is objected by expansive development of the previous version. 3 main conclusions obtained from this paper are the following. (1) The previously developed expert system was advanced in its estimation function toward the satisfaction of decommissioning planners. (2) The applicability of the system was enlarged to all the radioactive and non-radioactive wastes, demolished metal and concrete products, in a corresponding site of decommissioning. (3) Finally decommissioning recycle simulator was completed in a harmonized unification. (authors)

  13. Power stations in Poland running on brown coal-development up to now and anticipated

    International Nuclear Information System (INIS)

    Twardy, L.; Zawadzki, M.

    1994-01-01

    Polish power plants fueled by lignite are shortly described. They generate almost 40% of electric power which is 32% cheaper than the power from plants fueled by black coal (taking into account generation unit cost). The program of modernization and reconstruction of brown coal sector is presented and its development is discussed. 1 tab

  14. Development and application of probabilistic safety assessment PSA in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Huang Weigang; Chen Jiefei; Guo Jianbing; Zhen Wei

    2005-01-01

    This paper discusses the development and application of Level 1 PSA used for safety review, risk monitoring and on line maintenance of the nuclear power plant. PSA development includes the analysis of event tree, fault tree, FMEA, PSA quantification and the equipment reliability database. We have collected and processed the reliability data of external power source, the equipment reliability data and the initial event frequency. The thermal-hydraulics analysis of some important events and accidents, human factor analysis, and the calculation of human error probability have been made. During the development of event trees and fault trees, the effect of some support systems such as compressed air distribution system, ventilation system and electrical system have been taken into account. The system manuals, operation procedures and emergency operating procedures of Daya Bay NPP are referred to in this project. The operators of the NPP were involved in the establishment of all event trees and fault trees analysis. Furthermore, we have accepted the suggestion of IAEA experts, completed the logic chart of initial events to the initial events analysis of Daya Bay NPP, and optimized the code system of PSA model again. Together with the development of the reliability database, by absorbing the advanced experience of EDF, we have gained the reports about equipment's classifying, function and experience feedback information of Daya Bay NPP. According to the quantitative calculation of the latest Level 1 PSA Model of Daya Bay NPP, the results of Core Damage Frequency (CDF) is: CDF = 2.13E-5/reactor . year. The latest PSA Model of Daya Bay NPP includes: 1) 12 sorts of initial events, 67 sub-initial events, 70 fault trees; 2) 25 nuclear safety related systems were developed by fault trees and FMEA ; 3) 2609 fault tree logic gates; 4) 2146 basic events; 5) 680 core damage accident sequences. (authors)

  15. Development of Ada language control software for the NASA power management and distribution test bed

    Science.gov (United States)

    Wright, Ted; Mackin, Michael; Gantose, Dave

    1989-01-01

    The Ada language software developed to control the NASA Lewis Research Center's Power Management and Distribution testbed is described. The testbed is a reduced-scale prototype of the electric power system to be used on space station Freedom. It is designed to develop and test hardware and software for a 20-kHz power distribution system. The distributed, multiprocessor, testbed control system has an easy-to-use operator interface with an understandable English-text format. A simple interface for algorithm writers that uses the same commands as the operator interface is provided, encouraging interactive exploration of the system.

  16. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  17. SSE software test management STM capability: Using STM in the Ground Systems Development Environment (GSDE)

    Science.gov (United States)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    This report is one of a series discussing configuration management (CM) topics for Space Station ground systems software development. It provides a description of the Software Support Environment (SSE)-developed Software Test Management (STM) capability, and discusses the possible use of this capability for management of developed software during testing performed on target platforms. This is intended to supplement the formal documentation of STM provided by the SEE Project. How STM can be used to integrate contractor CM and formal CM for software before delivery to operations is described. STM provides a level of control that is flexible enough to support integration and debugging, but sufficiently rigorous to insure the integrity of the testing process.

  18. Development of Abnormal Operating Strategies for Station Blackout in Shutdown Operating Mode in Pressurized Water Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Duk-Joo; Lee, Seung-Chan; Sung, Je-Joong; Ha, Sang-Jun [KHNP CRI, Daejeon (Korea, Republic of); Hwang, Su-Hyun [FNC Tech. Co., Yongin (Korea, Republic of)

    2016-10-15

    Loss of all AC power is classified as one of multiple failure accident by regulatory guide of Korean accident management program. Therefore we need develop strategies for the abnormal operating procedure both of power operating and shutdown mode. This paper developed abnormal operating guideline for loss of all AC power by analysis of accident scenario in pressurized water reactor. This paper analyzed the loss of ultimate heat sink (LOUHS) in shutdown operating mode and developed the operating strategy of the abnormal procedure. Also we performed the analysis of limiting scenarios that operator actions are not taken in shutdown LOUHS. Therefore, we verified the plant behavior and decided operator action to taken in time in order to protect the fuel of core with safety. From the analysis results of LOUHS, the fuel of core maintained without core uncovery for 73 minutes respectively for opened RCS states after the SBO occurred. Therefore, operator action for the emergency are required to take in 73 minutes for opened RCS state. Strategy is to cooldown by using spent fuel pool cooling system. This method required to change the plant design in some plant. In RCS boundary closed state, first abnormal operating strategy in shutdown LOUHS is first abnormal operating strategy in shutdown LOUHS is to remove the residual heat of core by steam dump flow and auxiliary feedwater of SG.

  19. Development of standard testing methods for nuclear-waste forms

    International Nuclear Information System (INIS)

    Mendel, J.E.; Nelson, R.D.

    1981-11-01

    Standard test methods for waste package component development and design, safety analyses, and licensing are being developed for the Nuclear Waste Materials Handbook. This paper describes mainly the testing methods for obtaining waste form materials data

  20. Production development and utilization of Zimmer Station wet FGD by-products. Final report. Volume 1, Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Kevin [Dravo Technology Center, Pittsburgh, PA (United States); Beeghly, Joel H. [Dravo Technology Center, Pittsburgh, PA (United States)

    2000-11-30

    About 30 electric utility units with a combined total of 15,000 MW utilize magnesium enhanced lime flue gas desulfurization (FGD) systems. A disadvantage of this and other inhibited or natural oxidation wet FGD systems is the capital and operating cost associated with landfill disposal of the calcium sulfite based solids. Fixation to stabilize the solids for compaction in a landfill also consumes fly ash that otherwise may be marketable. This Executive Summary describes efforts to dewater the magnesium hydroxide and gypsum slurries and then process the solids into a more user friendly and higher value form. To eliminate the cost of solids disposal in its first generation Thiosorbic® system, the Dravo Lime Company developed the ThioClear® process that utilizes a magnesium based absorber liquor to remove S02 with minimal suspended solids. Magnesium enhanced lime is added to an oxidized bleed stream of thickener overflow (TOF) to produce magnesium hydroxide [Mg(OH)2] and gypsum (CaS04 • 2H20), as by-products. This process was demonstrated at the 3 to 5 MW closed loop FGD system pilot plant at the Miami Fort Station of Cinergy, near Cincinnati, Ohio with the help of OCDO Grant Agreement CDO/D-91-6. A similar process strictly for'recovery and reuse of Mg(OH)2 began operation at the Zimmer Station of Cinergy in late 1994 that can produce 900 pounds of Mg(OH)2 per hour and 2,600 pounds of gypsum per hour. This by-product plant, called the Zimmer Slipstream Magnesium Hydroxide Recovery Project Demonstration, was conducted with the help of OCDO Grant Agreement CDO/D-921-004. Full scale ThioClear® plants began operating in 1997 at the 130 MW Applied Energy Services plant, in Monaca, PA, and in year 2000 at the 1,330 MW Allegheny Energy Pleasants Station at St. Marys, WV.

  1. Exploration of plant growth and development using the European Modular Cultivation System facility on the International Space Station.

    Science.gov (United States)

    Kittang, A-I; Iversen, T-H; Fossum, K R; Mazars, C; Carnero-Diaz, E; Boucheron-Dubuisson, E; Le Disquet, I; Legué, V; Herranz, R; Pereda-Loth, V; Medina, F J

    2014-05-01

    Space experiments provide a unique opportunity to advance our knowledge of how plants respond to the space environment, and specifically to the absence of gravity. The European Modular Cultivation System (EMCS) has been designed as a dedicated facility to improve and standardise plant growth in the International Space Station (ISS). The EMCS is equipped with two centrifuges to perform experiments in microgravity and with variable gravity levels up to 2.0 g. Seven experiments have been performed since the EMCS was operational on the ISS. The objectives of these experiments aimed to elucidate phototropic responses (experiments TROPI-1 and -2), root gravitropic sensing (GRAVI-1), circumnutation (MULTIGEN-1), cell wall dynamics and gravity resistance (Cell wall/Resist wall), proteomic identification of signalling players (GENARA-A) and mechanism of InsP3 signalling (Plant signalling). The role of light in cell proliferation and plant development in the absence of gravity is being analysed in an on-going experiment (Seedling growth). Based on the lessons learned from the acquired experience, three preselected ISS experiments have been merged and implemented as a single project (Plant development) to study early phases of seedling development. A Topical Team initiated by European Space Agency (ESA), involving experienced scientists on Arabidopsis space research experiments, aims at establishing a coordinated, long-term scientific strategy to understand the role of gravity in Arabidopsis growth and development using already existing or planned new hardware. © 2014 German Botanical Society and The Royal Botanical Society of the Netherlands.

  2. Mobile environmental radiation monitoring station

    International Nuclear Information System (INIS)

    Assido, H.; Shemesh, Y.; Mazor, T.; Tal, N.; Barak, D.

    1997-01-01

    A mobile environmental radiation monitoring station has been developed and established for the Israeli Ministry of Environment. The radiation monitoring station is ready for immediate placing in any required location, or can be operated from a vehicle. The station collects data Tom the detector and transfers it via cellular communication network to a Computerized Control Center for data storage, processing, and display . The mobile station is fully controlled from the. Routinely, the mobile station responses to the data request accumulated since the last communication session. In case of fault or alarm condition in the mobile station, a local claim is activated and immediately initiates communication with the via cellular communication network. (authors)

  3. Geologic and hydrologic records of observation wells, test holes, test wells, supply wells, springs, and surface water stations in the Los Alamos area

    International Nuclear Information System (INIS)

    Purtymun, W.D.

    1995-01-01

    Hundreds of holes have been drilled into the Pajarito Plateau and surrounding test areas of the Los Alamos National Laboratory since the end of World War II. They range in depth from a few feet to more than 14,000 ft. The holes were drilled to provide geologic, hydrologic, and engineering information related to development of a water supply, to provide data on the likelihood or presence of subsurface contamination from hazardous and nuclear materials, and for engineering design for construction. The data contained in this report provide a basis for further investigations into the consequences of our past, present, and future interactions with the environment

  4. Next-generation Event Horizon Telescope developments: new stations for enhanced imaging

    Science.gov (United States)

    Palumbo, Daniel; Johnson, Michael; Doeleman, Sheperd; Chael, Andrew; Bouman, Katherine

    2018-01-01

    The Event Horizon Telescope (EHT) is a multinational Very Long Baseline Interferometry (VLBI) network of dishes joined to resolve general relativistic behavior near a supermassive black hole. The imaging quality of the EHT is largely dependent upon the sensitivity and spatial frequency coverage of the many baselines between its constituent telescopes. The EHT already contains many highly sensitive dishes, including the crucial Atacama Large Millimeter/Submillimeter Array (ALMA), making it viable to add smaller, cheaper telescopes to the array, greatly improving future capabilities of the EHT. We develop tools for optimizing the positions of new dishes in planned arrays. We also explore the feasibility of adding small orbiting dishes to the EHT, and develop orbital optimization tools for space-based VLBI imaging. Unlike the Millimetron mission planned to be at L2, we specifically treat near-earth orbiters, and find rapid filling of spatial frequency coverage across a large range of baseline lengths. Finally, we demonstrate significant improvement in image quality when adding small dishes to planned arrays in simulated observations.

  5. Hypersonic Inflatable Aerodynamic Decelerator Ground Test Development

    Science.gov (United States)

    Del Corso, Jospeh A.; Hughes, Stephen; Cheatwood, Neil; Johnson, Keith; Calomino, Anthony

    2015-01-01

    Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology readiness levels have been incrementally matured by NASA over the last thirteen years, with most recent support from NASA's Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP). Recently STMD GCDP has authorized funding and support through fiscal year 2015 (FY15) for continued HIAD ground developments which support a Mars Entry, Descent, and Landing (EDL) study. The Mars study will assess the viability of various EDL architectures to enable a Mars human architecture pathfinder mission planned for mid-2020. At its conclusion in November 2014, NASA's first HIAD ground development effort had demonstrated success with fabricating a 50 W/cm2 modular thermal protection system, a 400 C capable inflatable structure, a 10-meter scale aeroshell manufacturing capability, together with calibrated thermal and structural models. Despite the unquestionable success of the first HIAD ground development effort, it was recognized that additional investment was needed in order to realize the full potential of the HIAD technology capability to enable future flight opportunities. The second HIAD ground development effort will focus on extending performance capability in key technology areas that include thermal protection system, lifting-body structures, inflation systems, flight control, stage transitions, and 15-meter aeroshell scalability. This paper presents an overview of the accomplishments under the baseline HIAD development effort and current plans for a follow-on development effort focused on extending those critical technologies needed to enable a Mars Pathfinder mission.

  6. Developing and validating of predictive model for radiofrequency radiation emission within the vicinity of fm stations in Ghana

    International Nuclear Information System (INIS)

    Ahenkora-Duodu, Kingsley

    2016-07-01

    The rapid growing number of FM stations with their corresponding antennas have led to an increase in the concern of the potential health risks that may arise as a result of exposure to RF radiations. The main objective of this research was to develop and validate a predictive model with real time measured data for FM antennas in Ghana. Theoretical and experimental assessment of radiofrequency emission due to FM antennas has been analysed. The maximum and minimum electric field spatial average recorded was 7.17E-01 ± 6.97E-01V/m at Kasapa FM and 6.39E-02 ± 5.39E-02V/m at Asempa FM respectively. At a transmission frequency range of 88 -108 MHz, the average power density of the real time measured data ranged between 3.92E-05W/m"2 and 1.37E-03W/m"2 whiles that of the FM model varied from 9.72E-03W/m"2 to 5.35E-01W/m"2 respectively. Results obtained showed a variation between measured power density levels and the FM model. The FM model overestimates the power density levels as compared to that of the measured data. The impact predictions were based on the maximum values estimated by the FM model, hence these results validates the credibility of the impact analysis for the FM stations. The general public exposure quotient ranged between 9.00E-03 and 2.68E-01 whilst that of the occupational exposure quotient varied from 9.72E-04 to 5.35E-02. The results obtained were found to be in compliance with the International Commission on Non-Ionizing Radiation Protection (ICNIRP) RF exposure limit. (au)

  7. Alternative Fuels Data Center: Ethanol Fueling Stations

    Science.gov (United States)

    ... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure fueling stations by location or along a route. Infrastructure Development Learn about ethanol fueling infrastructure; codes, standards, and safety; and ethanol equipment options. Maps & Data E85 Fueling Station

  8. Development of radioactive waste treatment system for nuclear power stations by Toshiba (III)

    International Nuclear Information System (INIS)

    Irie, H.; Takahara, T.; Matsuda, T.; Matsuura, H.; Yasumura, K.; Nakayama, Y.

    1989-01-01

    This paper describes a solidification process with thermosetting resin to satisfy both requirements of volume reduction and quality of solidified products. Volumes of solidified products in drums generated from spent resins and concentrated wastes were reduced respectively to 1/4 and less than 1/6 of those in the conventional cement solidification process. In plants using a simple demineralizing system for condensate polishing, a large amount of waste water with regenerant chemicals is generated from the condensate demineralizer. In general, radioactivity concentration of wastes from this type of nuclear power plant is comparatively high, so the dose rate at the surface of drums containing solidified wastes exceeds 200mR/h. A pelletizing system for radioactive wastes was developed to reduce their volumes and allow their interim storage until the radioactivity decays down to a level at which they can be handled easily

  9. Inflatable Module Seal Interface Development and Testing

    Data.gov (United States)

    National Aeronautics and Space Administration — Develop a repeatable low permeable sealing interface evaluating O-ring, RTV bond and flowed RTV bond methods. Advanced Bladder materials (ArmorFlex, Nanoclay, etc)...

  10. Automated Vision Test Development and Validation

    Science.gov (United States)

    2016-11-01

    crystal display monitor (NEC Multisync, P232W) at 1920x1080 resolution. Proper calibration was confirmed using a spot photometer/colorimeter (X-Rite i1...visual input to the right and left eye was achieved using liquid crystal display shuttered glasses (NVIDIA 3D Vision 2). The stereo target (Figure 4...threshold on the automated tasks. • Subjects had a lower (better) threshold on color testing for all cone types using the OCCT due to a ceiling

  11. Development of non-destructive testing. Turkey

    International Nuclear Information System (INIS)

    1991-01-01

    A National Scheme for the qualification and certification of Non-Destructive Testing (NDT) personnel in various methods has been established as the first stage of implementation. Systematic training in such methods as radiography (RT), ultrasonics (UT), magnetic particles (MT), liquid penetrant (PT) and eddy currents (ET) at levels I, II and some at III has been initiated and should be continued. Direct link with the industry and continuous effort to extend practical applications is strongly recommended

  12. Performance testing SPECT systems: Recent developments

    International Nuclear Information System (INIS)

    Todd-Pokropek, A.

    1985-01-01

    A protocol is used to test as many currently available systems as possible, including both rotating gamma camera systems from GE, Siemens, Toshiba, Technicare, Elscint, Philips, Picker, etc, and single/multi slice system such as the Medimatic. This paper indicates changes that have occurred with respect to preliminary results previously published. Reconstructions were performed in a standard manner, using a Ramp filter and without attenuation correction, in order to reduce the effect of differences in software. The Jaszczak phantom was used to assess overall image quality. Tests were performed using the different collimators available. Image quality improved with better spatial resolution, even at the expense of sensitivity. Non-circular orbits, where available, were tested, and resolution was comparing for various positions and directions. With double headed systems, the results obtained were compared to those using a single head alone. Some gain in image quality seems to have been achieved by better uniformity resulting from improved correction circuitry, by the use of non-circular orbits, and from scatter correction. Potential still exists to improve collimator design

  13. Radiation workers of nuclear power stations and a method of regional economic development

    International Nuclear Information System (INIS)

    Nakagawa, Haruo

    2003-01-01

    In Japan, most of the electric power companies depend on radiation works to the external labor, but the employment of radiation works lacks its' stability. From the analysis on the mobility of radiation workers, we can see the stability of employment increases in proportion to the number of reactors. The radiation work is legally classified to harmful in Japan. And many health control systems for radiation workers are applied strictly. If we apply the health records registration system to the health control systems and involve them to the regional health care system, we can get more effective plan for regional economic development. It is therefore, very important to strive for employee controls, radiation controls, health examinations and data control. Furthermore, it is necessary to establish a total data management system that processes numerous amounts of data concerning radiation employees. This paper proposes the need for such a registration system to set up the system within regional medical information systems, and proposes the establishment of a radiation work market on the web using a total data management system. The system will include radiation employee control information service for members who are planning new employment contracts. (author)

  14. Evaluation of the expected moments algorithm and a multiple low-outlier test for flood frequency analysis at streamgaging stations in Arizona

    Science.gov (United States)

    Paretti, Nicholas V.; Kennedy, Jeffrey R.; Cohn, Timothy A.

    2014-01-01

    Flooding is among the costliest natural disasters in terms of loss of life and property in Arizona, which is why the accurate estimation of flood frequency and magnitude is crucial for proper structural design and accurate floodplain mapping. Current guidelines for flood frequency analysis in the United States are described in Bulletin 17B (B17B), yet since B17B’s publication in 1982 (Interagency Advisory Committee on Water Data, 1982), several improvements have been proposed as updates for future guidelines. Two proposed updates are the Expected Moments Algorithm (EMA) to accommodate historical and censored data, and a generalized multiple Grubbs-Beck (MGB) low-outlier test. The current guidelines use a standard Grubbs-Beck (GB) method to identify low outliers, changing the determination of the moment estimators because B17B uses a conditional probability adjustment to handle low outliers while EMA censors the low outliers. B17B and EMA estimates are identical if no historical information or censored or low outliers are present in the peak-flow data. EMA with MGB (EMA-MGB) test was compared to the standard B17B (B17B-GB) method for flood frequency analysis at 328 streamgaging stations in Arizona. The methods were compared using the relative percent difference (RPD) between annual exceedance probabilities (AEPs), goodness-of-fit assessments, random resampling procedures, and Monte Carlo simulations. The AEPs were calculated and compared using both station skew and weighted skew. Streamgaging stations were classified by U.S. Geological Survey (USGS) National Water Information System (NWIS) qualification codes, used to denote historical and censored peak-flow data, to better understand the effect that nonstandard flood information has on the flood frequency analysis for each method. Streamgaging stations were also grouped according to geographic flood regions and analyzed separately to better understand regional differences caused by physiography and climate. The B

  15. Trend curve data development and testing

    International Nuclear Information System (INIS)

    McElroy, W.N.; Gold, R.; Simons, R.L.; Roberts, J.H.

    1986-08-01

    Existing trend curves do not account for previous and more recently observed test and power reactor flux-level, thermal neutron and gamma-ray field-induced effects. Any agreement between measured data and trend curve predictions that does not adequately represent the important neutron environmental and temperature effects as well as the microstructural damage processes, therefore, could be fortuitous. Two principal questions asked concerning the metallurgical condition of the pressure vessel and its support structures are: What are the controlling variables; and What effects do they have on changing the metallurgical properties of the vessel and its support structures throughout their lifetimes

  16. Development and testing of hydrogen ignition devices

    International Nuclear Information System (INIS)

    Renfro, D.; Smith, L.; Thompson, L.; Clever, R.

    1982-01-01

    Controlled ignition systems for the mitigation of hydrogen produced during degraded core accidents have been installed recently in several light water reactor (LWR) containments. This paper relates the background of the thermal igniter approach and its application to LWR controlled ignition systems. The process used by the Tennessee Valley Authority (TVA) to select a hydrogen mitigation system in general and an igniter type in particular is described. Descriptions of both the Interim Distributed Ignition System and the Permanent Hydrogen Mitigation System installed by TVA are included as examples. Testing of igniter durability at TVA's Singleton Materials Engineering Laboratory and of igniter performance at Atomic Energy of Canada's Whiteshell Nuclear Research Establishment is presented

  17. Thermal management of space stations

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    Thermal management aims at making full use of energy resources available in the space station to reduce energy consumption, waste heat rejection and the weight of the station. It is an extension of the thermal control. This discussion introduces the concept and development of thermal management, presents the aspects of thermal management and further extends its application to subsystems of the space station.

  18. DEVELOPING COMMUNICATIVE LANGUAGE TESTS FOR SENIOR HIGH SCHOOL

    Directory of Open Access Journals (Sweden)

    Y. M. Harsono

    2005-01-01

    Full Text Available The Communicative Approach of teaching English in senior high school in Indonesia has been adopted since the implementation of The 1984 Curriculum, but the tests–the communicative language tests–(CL Tests have not been developed and used properly. The objective of the study is to develop CL Tests for senior high school. The procedure of conducting the study consists of three major steps, that is, identifying the objectives, developing the test specification, and developing the CL Tests. The development of the CL Tests in detail consists of fifteen sub-steps from determining what language skills tested, selecting the suitable source materials, up to rewriting the CL Tests to be used as CL Tests alternative for senior high school. The results of the test development reveal that there are fifteen CL Tests consisting of three tests of listening, three reading, three speaking, and three writing tests. The whole tests have construct and content validity, no complete evidence of concurrent validity with report marks and semester test scores, high to very high inter-rater reliability, and no complete practicality.

  19. Guide to good practices for the development of test items

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    While the methodology used in developing test items can vary significantly, to ensure quality examinations, test items should be developed systematically. Test design and development is discussed in the DOE Guide to Good Practices for Design, Development, and Implementation of Examinations. This guide is intended to be a supplement by providing more detailed guidance on the development of specific test items. This guide addresses the development of written examination test items primarily. However, many of the concepts also apply to oral examinations, both in the classroom and on the job. This guide is intended to be used as guidance for the classroom and laboratory instructor or curriculum developer responsible for the construction of individual test items. This document focuses on written test items, but includes information relative to open-reference (open book) examination test items, as well. These test items have been categorized as short-answer, multiple-choice, or essay. Each test item format is described, examples are provided, and a procedure for development is included. The appendices provide examples for writing test items, a test item development form, and examples of various test item formats.

  20. Valve stem packing seal test results for primary heat transport system conditions in Canadian nuclear generating stations

    International Nuclear Information System (INIS)

    Dixon, D.F.; Farrell, J.M.; Coutinho, R.F.

    1978-06-01

    Valve stem packing tests were done to obtain performance data on packing already in CANDU-PHW reactor service and on alternative packings. Most of the tests were replicated. Results are presented for ten packings tested under two stem cycle modes; leakage, packing consolidation and packing friction were the main responses. Packing tests were performed with water at close to CANDU-PHW reactor primary heat transport (PHT) system conditions (288 deg C and 10 MPa), but without ionizing radiation. The test rigs had rising, rotating stems. Stuffing box dimensions were typical of a standard Velan valve; packings were spring loaded to control applied packing stress

  1. Development of Trypanosomosis Agglutination Card Test (TACT ...

    African Journals Online (AJOL)

    In a bid to improve field diagnosis of animal trypanosomosis in tsetse-infested African countries, TACT utilizing fixed and stabilized procyclic antigen from culture-derived Trypanosoma brucei gambiense isolate IL2343 was developed and evaluated in Uganda. Its diagnostic sensitivity was evaluated using blood samples ...

  2. The Observability Calibration Test Development Framework

    Energy Technology Data Exchange (ETDEWEB)

    Endicott-Popovsky, Barbara E.; Frincke, Deborah A.

    2007-06-20

    Abstract— Formal standards, precedents, and best practices for verifying and validating the behavior of low layer network devices used for digital evidence-collection on networks are badly needed— initially so that these can be employed directly by device owners and data users to document the behaviors of these devices for courtroom presentation, and ultimately so that calibration testing and calibration regimes are established and standardized as common practice for both vendors and their customers [1]. The ultimate intent is to achieve a state of confidence in device calibration that allows the network data gathered by them to be relied upon by all parties in a court of law. This paper describes a methodology for calibrating forensic-ready low layer network devices based on the Flaw Hypothesis Methodology [2,3].

  3. Trend curve data development and testing

    International Nuclear Information System (INIS)

    McElroy, W.N.; Gold, R.; Simons, R.L.; Roberts, J.H.

    1986-01-01

    Existing trend curves do not account for previous and more recently observed test and power reactor flux-level, thermal neutron and γ-ray field-induced effects. Any agreement between measured data and trend curve predictions that does not adequately represent the important neutron environmental and temperature effects as well as the microstructural damage processes, therefore, could be fortuitous. Empirically derived end-of-life (EOL) and life-extension-range (LER) trend curves are presented and discussed in this paper for high temperature [∼288 0 C (550 0 F)] irradiation of two weld, two plate, and two forging pressure vessel (PV) steels and low-temperature [∼60 0 C (140 0 F)] irradiation of one support structure-type steel

  4. Testing Software Development Project Productivity Model

    Science.gov (United States)

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  5. Space station operations management

    Science.gov (United States)

    Cannon, Kathleen V.

    1989-01-01

    Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

  6. Developing a TTCN-3 Test Harness for Legacy Software

    DEFF Research Database (Denmark)

    Okika, Joseph C.; Ravn, Anders Peter; Siddalingaiah, Lokesh

    2006-01-01

    We describe a prototype test harness for an embedded system which is the control software for a modern marine diesel engine. The operations of such control software requires complete certification. We adopt Testing and Test Control Notation (TTCN-3) to define test cases for this purpose. The main...... challenge in developing the test harness is to interface a generic test driver to the legacy software and provide a suitable interface for test engineers. The main contribution of this paper is a demonstration of a suitable design for such a test harness. It includes: a TTCN-3 test driver in C++, the legacy...

  7. Tested program for Third World economic development

    Energy Technology Data Exchange (ETDEWEB)

    Lindholm, R.W.

    1977-04-01

    Some of the responsibility for the inability of Western-oriented Third World Countries (1) to make democratic economic institutions work rests upon advisers to American and international financial institutions who recommend principles of economic growth distilled out of Keynesian recipes for an over-saving Western society of the 1930s, and out of aspects of American experience with no applicability elsewhere. Applicable aspects of U.S. experience suggest a program relying on capitalistic drives and using fiscal and monetary policy of the type that proved useful in the development of democratic capitalism in the U.S. in the 19th century.

  8. Development and testing of spheroidal inorganic sorbents

    International Nuclear Information System (INIS)

    Collins, J.L.; Egan, B.Z.; Anderson, K.K.

    1996-01-01

    Objective was to develop sodium titanate (ST) microspheres, made by the HMTA (hexamethylenetetramine) internal gelation process, to remove radionuclides and heavy metals from waste streams at DOE sites. to determine the optimum amount of ST that can be embedded in hydrous Ti oxide (HTO) microspheres, batches of 9.2 to 23.3% ST in HTO were prepared. Crush strength of the air-dried microspheres was found to be highest. Sr was removed from simulated supernatant by all composite microspheres; 13.2% ST/HTO worked best

  9. Development of testing techniques for mine fan performance

    Institute of Scientific and Technical Information of China (English)

    WU Zheng-yan; JIANG Shu-guang; PENG Dan-ren

    2006-01-01

    Three progressive stages of testing techniques are elaborated, which are entirely manual operating, taking separate instruments testing and computer program controlling. The testing method and principle are detailed based on the testing process for meteorological parameters, air pressure, air quality and rotating velocity. And every testing technique is analyzed. Finally, the technique outlook is viewed. All this plays a leading role in development of the testing techniques.

  10. Networked simulation for team training of Space Station astronauts, ground controllers, and scientists - A training and development environment

    Science.gov (United States)

    Hajare, Ankur R.; Wick, Daniel T.; Bovenzi, James J.

    1991-01-01

    The purpose of this paper is to describe plans for the Space Station Training Facility (SSTF) which has been designed to meet the envisioned training needs for Space Station Freedom. To meet these needs, the SSTF will integrate networked simulators with real-world systems in five training modes: Stand-Alone, Combined, Joint-Combined, Integrated, and Joint-Integrated. This paper describes the five training modes within the context of three training scenaries. In addition, this paper describes an authoring system which will support the rapid integration of new real-world system changes in the Space Station Freedom Program.

  11. Development of an aging evaluation and life extension program for the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Dwight, J.E. Jr.

    1988-01-01

    A life extension program has been developed for the US Department of Energy's Advanced Test Reactor. The program is an adaptation of life extension pilot programs at the Surry Unit 1 and Monticello generating stations and is being completed in three phases. In Phase 1, the critical plant components were identified. In Phase 2, existing lifetime analyses and support data for the critical components were reviewed. The results from the review give a preliminary indication that an overall plant lifetime in excess of forty years is feasible. In Phase 3, now in progress, detailed evaluations for component life extensions are being performed. 2 refs., 2 figs., 1 tab

  12. Transcription and the IELTS Speaking Test: Facilitating Development

    Science.gov (United States)

    Stones, Thomas P.

    2013-01-01

    This article describes a transcription task cycle that was designed to facilitate the development of skills for the IELTS (International English Language Testing System) speaking test at a language school in Japan. The cycle involved practice test, transcription, student correction, teacher correction, and retrial of the original test and…

  13. Achievement report for fiscal 2000 on the phase II research and development for hydrogen utilizing international clean energy system technology (WE-NET). Task 7. Development of hydrogen refueling station; 2000 nendo suiso riyo kokusai clean energy system gijutsu (WE-NET) dai 2 ki kenkyu kaihatsu. Task 7. Suiso kyokyu station no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This paper describes the achievements in fiscal 2000 from the development of hydrogen refueling stand-alone stations for hydrogen fueled automobiles in the WE-NET. Supply capacity of practical size of 1/10, 30 Nm{sup 3} was selected as the object. For the natural gas reformed type hydrogen generator, discussions were given on design and manufacture of a reforming unit and a PSA device. The PCT diagram method was discussed to estimate the capacity of a hydrogen absorbing alloy type storing facility. Interface between fuel cell driven automobiles and the station was adjusted. For the solid polymer electrolyte water decomposition type, safety measures were discussed with a high-pressure filling system kept in mind. Detailed design was made on a water decomposing hydrogen generator. Fabrication was completed on the hydrogen absorbing alloy type storing facility, and verifications were given on the storage amount, hydrogen absorbing speed, and discharge capability. In the high-pressure refueling system, temperature rise was simulated at a pressure of 35 MPa. Refueling for ten minutes raised the gas temperature by 75 degrees C, and the container surface by 65 degrees C. Local temperature rise was forecasted in the actual work, which is a future discussion assignment. An outline method was discussed for the verification test. (NEDO)

  14. Development of Research Reactor Simulator and Its Application to Dynamic Test-bed

    International Nuclear Information System (INIS)

    Kwon, Kee Choon; Park, Jae Chang; Lee, Seung Wook; Bang, Dane; Bae, Sung Won

    2014-01-01

    We developed HANARO and the Jordan Research and Training Reactor (JRTR) real-time simulator for operating staff training. The main purpose of this simulator is operator training, but we modified this simulator as a dynamic test-bed to test the reactor regulating system in HANARO or JRTR before installation. The simulator configuration is divided into hardware and software. The simulator hardware consists of a host computer, 6 operator stations, a network switch, and a large display panel. The simulator software is divided into three major parts: a mathematical modeling module, which executes the plant dynamic modeling program in real-time, an instructor station module that manages user instructions, and a human machine interface (HMI) module. The developed research reactors are installed in the Korea Atomic Energy Research Institute nuclear training center for reactor operator training. To use the simulator as a dynamic test-bed, the reactor regulating system modeling software of the simulator was replaced by a hardware controller and the simulator and target controller were interfaced with a hard-wired and network-based interface

  15. Development of Research Reactor Simulator and Its Application to Dynamic Test-bed

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Kee Choon; Park, Jae Chang; Lee, Seung Wook; Bang, Dane; Bae, Sung Won [KAERI, Daejeon (Korea, Republic of)

    2014-08-15

    We developed HANARO and the Jordan Research and Training Reactor (JRTR) real-time simulator for operating staff training. The main purpose of this simulator is operator training, but we modified this simulator as a dynamic test-bed to test the reactor regulating system in HANARO or JRTR before installation. The simulator configuration is divided into hardware and software. The simulator hardware consists of a host computer, 6 operator stations, a network switch, and a large display panel. The simulator software is divided into three major parts: a mathematical modeling module, which executes the plant dynamic modeling program in real-time, an instructor station module that manages user instructions, and a human machine interface (HMI) module. The developed research reactors are installed in the Korea Atomic Energy Research Institute nuclear training center for reactor operator training. To use the simulator as a dynamic test-bed, the reactor regulating system modeling software of the simulator was replaced by a hardware controller and the simulator and target controller were interfaced with a hard-wired and network-based interface.

  16. Decommissioning situation and research and development for the decommissioning of the commercial nuclear power station in Japan

    International Nuclear Information System (INIS)

    Yamamoto, Tatsumi.

    1996-01-01

    There are 48 commercial nuclear power stations in operation in Japan as of January 1, 1995, which supplies about 28% (2.2 x 10 8 MWh) of total annual electricity generation in FY 1992. Accordingly, as the nuclear power contributes so much in electricity generation, there is a growing concern in the public toward the safety on decommissioning nuclear power station. It is gravely important to secure the safety throughout the decommissioning. This paper discusses: the decommissioning situation in Japan; the Japanese national policy for decommissioning of commercial nuclear power stations; R and D for decommissioning of commercial nuclear power stations in Japan; and the present conditions of low-level radioactive wastes disposal in Japan

  17. Very Portable Remote Automatic Weather Stations

    Science.gov (United States)

    John R. Warren

    1987-01-01

    Remote Automatic Weather Stations (RAWS) were introduced to Forest Service and Bureau of Land Management field units in 1978 following development, test, and evaluation activities conducted jointly by the two agencies. The original configuration was designed for semi-permanent installation. Subsequently, a need for a more portable RAWS was expressed, and one was...

  18. Development of an Autonomous Navigation Technology Test Vehicle

    National Research Council Canada - National Science Library

    Tobler, Chad K

    2004-01-01

    .... In order to continue these research activities at CIMAR, a new Kawasaki Mule All-Terrain Vehicle was chosen to be automated as a test-bed for the purpose of developing and testing autonomous vehicle technologies...

  19. Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory

    Science.gov (United States)

    We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.

  20. Microbial Challenge Testing of Single Liquid Cathode Feed Water Electrolysis Cells for the International Space Station (ISS) Oxygen Generator Assembly (OGA)

    Science.gov (United States)

    Roy, Robert J.; Wilson, Mark E.; Diderich, Greg S.; Steele, John W.

    2011-01-01

    The International Space Station (ISS) Oxygen Generator Assembly (OGA) operational performance may be adversely impacted by microbiological growth and biofilm formation over the electrolysis cell membranes. Biofilms could hinder the transport of water from the bulk fluid stream to the membranes and increase the cell concentration overpotential resulting in higher cell voltages and a shorter cell life. A microbial challenge test was performed on duplicate single liquid-cathode feed water electrolysis cells to evaluate operational performance with increasing levels of a mixture of five bacteria isolated from ISS and Space Shuttle potable water systems. Baseline performance of the single water electrolysis cells was determined for approximately one month with deionized water. Monthly performance was also determined following each inoculation of the feed tank with 100, 1000, 10,000 and 100,000 cells/ml of the mixed suspension of test bacteria. Water samples from the feed tank and recirculating water loops for each cell were periodically analyzed for enumeration and speciation of bacteria and total organic carbon. While initially a concern, this test program has demonstrated that the performance of the electrolysis cell is not adversely impacted by feed water containing the five species of bacteria tested at a concentration measured as high as 1,000,000 colony forming units (CFU)/ml. This paper presents the methodologies used in the conduct of this test program along with the performance test results at each level of bacteria concentration.