WorldWideScience

Sample records for startup test program

  1. Canister disposition plan for the DWPF Startup Test Program

    International Nuclear Information System (INIS)

    Harbour, J.R.; Payne, C.H.

    1990-01-01

    This report details the disposition of canisters and the canistered waste forms produced during the DWPF Startup Test Program. The six melter campaigns (DWPF Startup Tests FA-13, WP-14, WP-15, WP-16, WP-17, and FA-18) will produce 126 canistered waste forms. In addition, up to 20 additional canistered waste forms may be produced from glass poured during the transition between campaigns. In particular, this canister disposition plan (1) assigns (by alpha-numeric code) a specific canister to each location in the six campaign sequences, (2) describes the method of access for glass sampling on each canistered waste form, (3) describes the nature of the specific tests which will be carried out, (4) details which tests will be carried out on each canistered waste form, (5) provides the sequence of these tests for each canistered waste form, and (6) assigns a storage location for each canistered waste form. The tests are designed to provide evidence, as detailed in the Waste Form Compliance Plan (WCP 1 ), that the DWPF product will comply with the Waste Acceptance Product Specifications (WAPS 2 ). The WAPS must be met before the canistered waste form is accepted by DOE for ultimate disposal at the Federal Repository. The results of these tests will be included in the Waste Form Qualification Report (WQR)

  2. Quality assurance during preoperational testing and during startup operation

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.

    1980-01-01

    Rules and guidelines for the quality assurance. Quality assurance in the course of preoperational testing and the startup period: preoperational testing; hot functional test I; hot functional test II; initial making critical and zero power physics testing; power range testing. Startup documents: startup program; startup instructions; startup data sheet; startup sequence outlines; final startup reports. Advisory safety committee for nuclear startup. (orig./RW)

  3. Startup program after SGR and power increase

    International Nuclear Information System (INIS)

    Krajnc, B.; Dudas, M.; Spiler, J.; Novsak, M.

    2000-01-01

    NPP Krsko replaced steam generators during the outage 2000. Parallel with the steam generator replacement all required systems modifications to accommodate new steam generators into the existing plant (upper feed,..) and support plant power increase of 6.3%, have been implemented. During the years 1997 - 2000 all the required licensing, technical analyses and systems verifications to support such plant changes have been completed. One of the activities within this effort was also the preparation of a detailed Plant Startup Program, which was subject of licensing review and approval process. An integrated plant startup program was then developed based on the plant startup test program, performed regularly during plant startup after refueling and above-mentioned Plant Startup Program. These additional tests defined by the Startup Test Program have been required due to new steam generators, steam generator replacement and related modifications, and power increase from previous 1882 MWt to 2000 MWt. During the preparation period, a startup team was established and procedures were written. All procedures sensitive to the operation were validated on the plant specific simulator. This paper presents more about the Startup Test Program, analysis of its implementation, the results of some key tests as well as the lessons learned. (author)

  4. The Family Startup Program

    DEFF Research Database (Denmark)

    Trillingsgaard, Tea; Maimburg, Rikke Damkjær; Simonsen, Marianne

    2015-01-01

    Background: Inadequate parenting is an important public health problem with possible severe and long-term consequences related to child development. We have solid theoretical and political arguments in favor of efforts enhancing the quality of the early family environment in the population at large....../design: Participants will be approximately 2500 pregnant women and partners. Inclusion criteria are parental age above 18 and the mother expecting first child. Families are recruited when attending routine pregnancy scans provided as a part of the publicly available prenatal care program at Aarhus University Hospital...... and community resources. The program consists of twelve group sessions, with nine families in each group, continuing from pregnancy until the child is 15 months old. TAU is the publicly available pre- and postnatal care available to families in both conditions. Analyses will employ survey data, administrative...

  5. 20 CFR 632.254 - Program startup.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program startup. 632.254 Section 632.254 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.254 Program startup...

  6. USA/FBR program status FFTF operations startup experience

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Izatt, R.D.

    1981-06-01

    This paper gives highlights of the major Operations evaluations and operational results of the startup acceptance testing program and initiation of normal operating cycles for experiment irradiation in the FFTF. 33 figures

  7. Initial results from the canistered waste forms produced during the first campaign of the DWPF Startup Test Program

    International Nuclear Information System (INIS)

    Harbour, J.R.

    1995-01-01

    As part of the Defense Waste Processing Facility (DWPF) Startup Test Program, approximately 90 canisters will be filled with glass containing simulated radioactive waste during five separate campaigns. The first campaign is a facility acceptance test to demonstrate the operability of the facility and to collect initial data on the glass and the canistered waste forms. During the next four campaigns (the waste qualification campaigns) data will be obtained which will be used to demonstrate that the DWPF product meets DOE's Waste Acceptance Product Specifications (WAPS). Currently 12 of the 16 canisters have been filled with glass during the first campaign (FA-13). This paper describes the tests that have been carried out on these 12 glass-filled canisters and presents the data with reference to the acceptance criteria of the WAPS. These tests include measurement of canister dimensions prior to and after glass filling. dew point, composition, and pressure of the gas within the free volume of the canister, fill height, free volume, weight, leak rates of welds and temporary seals, and weld parameters

  8. Measurement of the volatility and glass transition temperatures of glasses produced during the DWPF startup test program

    International Nuclear Information System (INIS)

    Marra, J.C.; Harbour, J.R.

    1995-01-01

    The Defense Waste Processing Facility (DWPF) will immobilize high-level radioactive waste currently stored in underground tanks at the Savannah River Site by incorporating the waste into a glass matrix. The molten waste glass will be poured into stainless steel canisters which will be welded shut to produce the final waste form. One specification requires that any volatiles produced as a result of accidentally heating the waste glass to the glass transition temperature be identified. Glass samples from five melter campaigns, run as part of the DWPF Startup Test Program, were analyzed to determine glass transition temperatures and to examine the volatilization (by weight loss). Glass transition temperatures (T g ) for the glasses, determined by differential scanning calorimetry (DSC), ranged between 445 C and 474 C. Thermogravimetric analysis (TGA) scans showed that no overall weight loss occurred in any of the glass samples when heated to 500 C. Therefore, no volatility will occur in the final glass product when heated up to 500 C

  9. Application of startup/core management code system to YGN 3 startup testing

    International Nuclear Information System (INIS)

    Chi, Sung Goo; Hah, Yung Joon; Doo, Jin Yong; Kim, Dae Kyum

    1995-01-01

    YGN 3 is the first nuclear power plant in Korea to use the fixed incore detector system for startup testing and core management. The startup/core management code system was developed from existing ABB-C-E codes and applied for YGN 3 startup testing, especially for physics and CPC(Core Protection Calculator)/COLSS (Core Operating Limit Supervisory System) related testing. The startup/core management code system consists of startup codes which include the CEBASE, CECOR, CEFAST and CEDOPS, and startup data reduction codes which include FLOWRATE, COREPERF, CALMET, and VARTAV. These codes were implemented on an HP/Apollo model 9000 series 400 workstation at the YGN 3 site and successfully applied to startup testing and core management. The startup codes made a great contribution in upgrading the reliability of test results and reducing the test period by taking and analyzing core data automatically. The data reduction code saved the manpower and time for test data reduction and decreased the chance for error in the analysis. It is expected that this code system will make similar contributions for reducing the startup testing duration of YGN 4 and UCN3,4

  10. Characteristics of HTTR's startup physics tests

    International Nuclear Information System (INIS)

    Nojiri, N.; Nakano, M.; Takeuchi, M.; Pohl, P.; Yamashita, K.

    1997-01-01

    The High Temperature Engineering Test Reactor (HTTR) which is under construction by Japan Atomic Energy Research Institute (JAERI) is a graphite-moderated and helium gas-cooled reactor with an outlet temperature of 950 deg. C and a thermal output of 30MW. The first criticality is expected at the end of October 1997. The start-up physics tests (SPTs) are planned in the period from mid 1997 to the end of 1998. Characteristic items of the SPTs are: 1) Criticality approach; 2) Tests on a preliminary annual core; 3) Measurement of scram reactivity; 4) Excess reactivity test; 5) Measurements along with a 2-step-scram reactor shutdown procedure. (author)

  11. Three Mile Island Startup program and its contributions to plant performance

    International Nuclear Information System (INIS)

    Brill, R.A.; Barton, J.J.

    1976-01-01

    The General Public Utilities Service Corporation Startup Organization provided a specialized group for startup testing, coordination, and management of the Three Mile Island Unit No. 1 nuclear power plant. This organization conducted an extensive test program which contributed to Three Mile Island's high first year plant availability

  12. Reload Startup Physics Tests for Tianwan Nuclear Power station

    International Nuclear Information System (INIS)

    Yang Xiaoqiang; Li Wenshuang; Li Youyi; Yao Jinguo; Li Zaipeng Jiangsu

    2010-01-01

    This paper briefly describes the test purposes, test items, test schedules and test equipment's for reload startup physics test's on Unit 1 and 2 of Tianwan Nuclear Power station. Then, an overview of the previous thrice tests and evaluations on the tests results are presented. In the end, the paper shows the development and work direction of optimization project for reload startup physics tests on Unit 1 and 2 of Tianwan Nuclear Power station. (Authors)

  13. TIBER engineering test reactor (ETR) startup scenarios

    International Nuclear Information System (INIS)

    Blackfield, D.T.; Perkins, L.J.

    1987-01-01

    A time-dependent Tokamak Systems Code (TTSC) has been developed and used to examine various inductively driven startup scenarios for the TIBER reactor. Radially averaged particle and energy balance equations are solved. In addition, time varying currents in the PF and OH coils are determined from MHD equilibrium and volt-seconds considerations. Less than 20 MW of auxiliary power deposited in the electrons is required to obtain steady-state operations. For this scenario, less than 10% of the total volt-seconds capability is consumed during startup and the currents in the PF and OH coils do not appear to exceed stress limits. For every volt-second saved during startup, the burn time can be extended 14 seconds. 4 refs., 6 figs., 3 tabs

  14. Program of RA reactor start-up to nominal power

    International Nuclear Information System (INIS)

    1959-01-01

    The zero start-up program is followed by the program of RA reactor start-up to nominal power. This program is described in detail and includes the following measurements: radiation characteristics at the exit of the channels; gamma and fast neutron dose distribution in the reactor; influence of absorbers on the reactivity; temperature effect; absolute flux and calibration of ionization chambers; xenon effect; thermal and hydraulics; dosimetry around the reactor; neutron flux in the reactor core and in the reactor hall; heavy water level; thermal characteristics after shutdown. A list of measuring devices and instrumentation is included with the detailed action plan and list of responsible staff members

  15. Retran simulation of Oyster Creek generator trip startup test

    International Nuclear Information System (INIS)

    Alammar, M.A.

    1987-01-01

    RETRAN simulation of Oyster Creek generator trip startup test was carried out as part of Oyster Creek RETRAN model qualification program for reload licensing applications. The objective of the simulation was to qualify the turbine model and its interface with the control valve and bypass systems under severe transients. The test was carried out by opening the main breakers at rated power. The turbine speed governor closed the control valves and the pressure regulator opened the bypass valves within 0.5 sec. The stop valves closed by a no-load turbine trip, before the 10 percent overspeed trip was reached and the reactor scrammed on high APRM neutron flux. The simulation resulted in qualifying a normalized hydraulic torque for the turbine model and a 0.3 sec, delay block for the bypass model to account for the different delays in the hydraulic linkages present in the system. One-dimensional kinetics was used in this simulation

  16. Start-up tests of NSRR

    International Nuclear Information System (INIS)

    1976-12-01

    Start up tests of the Nuclear Safety Research Reactor (NSRR) were carried out from June 25 to August 15, 1975. The course of tests is in three stage, i.e. critical approach and zero power, power-up and pulse operation. Performance of the reactor was shown to be in good agreement with the design specifications in both steady-state and pulse operations. Test procedures and the results are presented in four parts: (I) general, (II) zero-power tests, (III) power-up tests, and (IV) pulse operation tests. (auth.)

  17. Business start-ups and the effect of coaching programs

    OpenAIRE

    Loersch, Christian

    2015-01-01

    Entrepreneurship is known to be a main driver of economic growth. Hence, governments have an interest in supporting and promoting entrepreneurial activities. Start-up subsidies, which have been analyzed extensively, only aim at mitigating the lack of financial capital. However, some entrepreneurs also lack in human, social, and managerial capital. One way to address these shortcomings is by subsidizing coaching programs for entrepreneurs. However, theoretical and empirical evidence about busi...

  18. Startup of large coil test facility

    International Nuclear Information System (INIS)

    Haubenreich, P.N.; Bohanan, R.E.; Fietz, W.A.; Luton, J.N.; May, J.R.

    1984-01-01

    The Large Coil Test Facility (LCTF) is being used to test superconducting toroidal field coils about one-third the size of those for INTOR. Data were obtained on performance of refrigerator, helium distribution, power supplies, controls, and data acquisition systems and on the acoustic emission, voltages, currents, and mechanical strains during charging and discharging the coils. (author)

  19. Startup of Large Coil Test Facility

    International Nuclear Information System (INIS)

    Haubenreich, P.N.; Bohanan, R.E.; Fietz, W.A.; Luton, J.N.; May, J.R.

    1984-01-01

    The Large Coil Test Facility (LCTF) is being used to test superconducting toroidal field coils about one-third the size of those for INTOR. Eventually, six different coils from four countries will be tested. Operations began in 1983 with acceptance testing of the helium refrigerator/liquefier system. Comprehensive shakedown of the facility and tests with the first three coils (from Japan, the United States, and Switzerland) were successfully accomplished in the summer of 1984. Currents up to 10,200 A and fields up to 6.4 T were reached. Data were obtained on performance of refrigerator, helium distribution, power supplies, controls, and data acquisition systems and on the acoustic emission, voltages, currents, and mechanical strains during charging and discharging the coils

  20. Startup of Large Coil Test Facility

    International Nuclear Information System (INIS)

    Haubenreich, P.N.; Bohanan, R.E.; Fietz, W.A.; Luton, J.N.; May, J.R.

    1985-01-01

    The Large Coil Test Facility (LCTF) is being used to test superconducting toroidal field coils about one-third the size of those for INTOR. Eventually, six different coils from four countries will be tested. Operations began in 1983 with acceptance testing of the helium refrigerator/liquefier system. Comprehensive shakedown of the facility and tests with the first three coils (from Japan, the United States, and Switzerland) were successfully accomplished in the summer of 1984. Currents up to 10,200 A and fields up to 6.4 T were reached. Data were obtained on performance of refrigerator, helium distribution, power supplies, controls, and data acquisition systems and on the acoustic emission, voltages, currents, and mechanical strains during charging and discharging the coils

  1. Anticipated simulation of Angra-1 start-up physical tests

    International Nuclear Information System (INIS)

    Fernandes, V.B.; Perrotta, J.A.; Silva Ipojuca, T. da; Ponzoni Filho, P.

    1981-01-01

    Some results foreseen by the Department of Nuclear Fuel (DCN. O) in Furnas for the measurements that will be realized during the start-up integrated tests for Angra-1 are presented. All the forecasting is based on a DCN.O proper correlation methodology, developed from basic physical principles, using computer codes developed by the authors or public computer codes adapted to this methodology. (E.G.) [pt

  2. Physical startup tests for VVER-1200 of Novovoronezh NPP. Advanced technique and some results

    Energy Technology Data Exchange (ETDEWEB)

    Afanasiev, Dmitry A.; Kraynov, Yury A.; Pinegin, Anatoly A.; Tsyganov, Sergey V. [National Research Centre, Moscow (Russian Federation). Kurchatov Inst.

    2017-09-15

    The intention of the startup physics tests was to confirm design characteristics of the core loading and their compliance with safety analysis preconditions. The program of startup tests for the leading unit is usually composed in such a way that is is possible to study as much neutron-physical characteristics as possible in the safest condition of zero power. State-of-the-art safety analysis is including computer codes that use three dimensional neutron kinetics and thermohydraulics models. For the substantiation of such models, for its validation and verification there is a need in reactor experiments that implementing spatially distributed transients. We based on such statements when composing hot zero power physical startup program for the new VVER-1200 unit of Novovoronezh NPP. Several tests unconventional for VVER were developed for that program. It includes measuring the worth for each of control rod groups and measuring of single rod worth from the inserted groups - test that models rod ejection event in some sense.

  3. Start-up test of the prototype heavy water reactor 'FUGEN', (1)

    International Nuclear Information System (INIS)

    Ando, Hideki; Kawahara, Toshio

    1982-01-01

    The advanced thermal prototype reactor ''Fugen'' is a heavy water-moderated, boiling light water-cooled power reactor with electric output of 165 MW, which has been developed since 1966 as a national project. The start-up test was begun in March, 1978, being scheduled for about one year, and in March, 1979, it passed the final pre-use inspection and began the full scale operation. In this paper, the result of the start-up test of Fugen is reported. From the experience of the start-up test of Fugen, the following matters are important for the execution of start-up test. 1) Exact testing plan and work schedule, 2) the organization to perform the test, 3) the rapid evaluation of test results and the reflection to next testing plan, and 4) the reflection of test results to rated operation, regular inspection and so on. In the testing plan, the core characteristics peculiar to Fugen, and the features of heavy water-helium system, control system and other equipment were added to the contents of the start-up test of BWRs. The items of the start-up test were reactor physics test, plant equipment performance test, plant dynamic characteristic test, chemical and radiation measurement, and combined test. The organization to perform the start-up test, and the progress and the results of the test are reported. (Kako, I.)

  4. FFTF startup: status and results

    International Nuclear Information System (INIS)

    Noordhoff, B.H.; Moore, C.E.

    1980-03-01

    Startup testing on the Fast Flux Test Facility (FFTF) during the past three years has progressed beyond initial criticality toward the principal goal of power demonstration in 1980. An overview is presented of technical results to date and project plans to achieve power demonstration and complete the startup test program

  5. Startup testing of Romania dual-core test reactor

    International Nuclear Information System (INIS)

    Whittemore, W.L.

    1980-01-01

    Late in 1979 both the Annular Core Pulsed Reactor (ACPR) and the 14-MW steady-state reactor (SSR) were loaded to critical. The fuel loading in both was then carried to completion and low-power testing was conducted. Early in 1980 both reactors successfully underwent high-power testing. The ACPR was operated for several hours at 500 kW and underwent pulse tests culminating in pulses with reactivity insertions of $4.60, peak power levels of about 20,000 MW, energy releases of 100 MW-sec, and peak measured fuel temperatures of 830 deg. C. The SSR was operated in several modes, both with natural convection and forced cooling with one or more pumps. The reactor successfully completed a 120-hr full-power test. Subsequent fuel element inspections confirmed that the fuel has performed without fuel damage or distortion. (author)

  6. Start-up test of Fukushima Daini Nuclear Power Station Unit No.3

    International Nuclear Information System (INIS)

    Inomata, Toshio; Umezu, Akira; Kajikawa, Makoto; Koibuchi, Hiroshi; Netsu, Nobuhiko.

    1986-01-01

    In Unit 3 of the Fukushima Nuclear Power Station II (daini), a BWR power plant of output 1,100 MW, commercial operation was started in June 1985. Its start-up test was finished successfully in about nine months. That is, new equipments introduced were demonstration tested. Though the items of testing are increased, the start-up test took short time, resulting in construction period only 54.7 months of the Unit 3, the shortest in the world. During the test, there was no scramming other than the planned. Described are the following: an outline of the Unit 3, the items of its improvement and standardization, including the new equipments, preparations for the start-up test, the start-up test and its evaluation. (Mori, K.)

  7. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    necessary. The fuel canisters to be processed shall be listed in the Fuel Campaign Letter and are identified in HNF-4898, ''Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specifications (OCRWM)''

  8. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  9. Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria

  10. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria

  11. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification ( OCRWM)

    Energy Technology Data Exchange (ETDEWEB)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-08-07

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria.

  12. Nevada Test Site closure program

    International Nuclear Information System (INIS)

    Shenk, D.P.

    1994-08-01

    This report is a summary of the history, design and development, procurement, fabrication, installation and operation of the closures used as containment devices on underground nuclear tests at the Nevada Test Site. It also addresses the closure program mothball and start-up procedures. The Closure Program Document Index and equipment inventories, included as appendices, serve as location directories for future document reference and equipment use

  13. Preliminary analyses for HTTR`s start-up physics tests by Monte Carlo code MVP

    Energy Technology Data Exchange (ETDEWEB)

    Nojiri, Naoki [Science and Technology Agency, Tokyo (Japan); Nakano, Masaaki; Ando, Hiroei; Fujimoto, Nozomu; Takeuchi, Mitsuo; Fujisaki, Shingo; Yamashita, Kiyonobu

    1998-08-01

    Analyses of start-up physics tests for High Temperature Engineering Test Reactor (HTTR) have been carried out by Monte Carlo code MVP based on continuous energy method. Heterogeneous core structures were modified precisely, such as the fuel compacts, fuel rods, coolant channels, burnable poisons, control rods, control rod insertion holes, reserved shutdown pellet insertion holes, gaps between graphite blocks, etc. Such precise modification of the core structures was difficult with diffusion calculation. From the analytical results, the followings were confirmed; The first criticality will be achieved around 16 fuel columns loaded. The reactivity at the first criticality can be controlled by only one control rod located at the center of the core with other fifteen control rods fully withdrawn. The excess reactivity, reactor shutdown margin and control rod criticality positions have been evaluated. These results were used for planning of the start-up physics tests. This report presents analyses of start-up physics tests for HTTR by MVP code. (author)

  14. Preliminary analyses for HTTR's start-up physics tests by Monte Carlo code MVP

    International Nuclear Information System (INIS)

    Nojiri, Naoki; Nakano, Masaaki; Ando, Hiroei; Fujimoto, Nozomu; Takeuchi, Mitsuo; Fujisaki, Shingo; Yamashita, Kiyonobu

    1998-08-01

    Analyses of start-up physics tests for High Temperature Engineering Test Reactor (HTTR) have been carried out by Monte Carlo code MVP based on continuous energy method. Heterogeneous core structures were modified precisely, such as the fuel compacts, fuel rods, coolant channels, burnable poisons, control rods, control rod insertion holes, reserved shutdown pellet insertion holes, gaps between graphite blocks, etc. Such precise modification of the core structures was difficult with diffusion calculation. From the analytical results, the followings were confirmed; The first criticality will be achieved around 16 fuel columns loaded. The reactivity at the first criticality can be controlled by only one control rod located at the center of the core with other fifteen control rods fully withdrawn. The excess reactivity, reactor shutdown margin and control rod criticality positions have been evaluated. These results were used for planning of the start-up physics tests. This report presents analyses of start-up physics tests for HTTR by MVP code. (author)

  15. Nuclear start-up, testing and core management of the Fast Test Reactor (FTR)

    International Nuclear Information System (INIS)

    Bennett, R.A.; Daughtry, J.W.; Harris, R.A.; Jones, D.H.; Nelson, J.V.; Rawlins, J.A.; Rothrock, R.B.; Sevenich, R.A.; Zimmerman, B.D.

    1980-01-01

    Plans for the nuclear start-up, low and high power physics testing, and core management of the Fast Test Reactor (FTR) are described. Owing to the arrangement of the fuel-handling system, which permits continuous instrument lead access to experiments during refuelling, it is most efficient to load the reactor in an asymmetric fashion, filling one-third core sectors at a time. The core neutron level will be monitored during this process using both in-core and ex-core detectors. A variety of physics tests are planned following the core loading. Because of the experimental purpose of the reactor, these tests will include a comprehensive characterization programme involving both active and passive neutron and gamma measurements. Following start-up tests, the FTR will be operated as a fast neutron irradiation facility, to test a wide variety of fast reactor core components and materials. Nuclear analyses will be made prior to each irradiation cycle to confirm that the planned arrangement of standard and experimental components satisfies all safety and operational constraints, and that all experiments are located so as to achieve their desired irradiation environment. (author)

  16. Time program using in automatization of steam turbines start-up

    International Nuclear Information System (INIS)

    Lejzerovich, A.Sh.; Melamed, A.D.

    Examples and arguments for developing time programs of changing basic parameters of automated start-up of TPP and NPP high-power steam turbines are considered. Basic parameters subject to controlled changing at automatization of turbine start-up are rotation frequency, loading and temperature of steam supplied to the turbine. Principle facility schemes of program regulation of steam temperature at the start-up are presented. The facility scheme of loading the NPP wet steam turbine is given. The principles of developing time programs, of changing basic parameters of automated start-up enable realizing transient processes close to theoretically optimum processes at arbitrary prestart-up state of the turbine by means of rather simple autatic facilities. In particular, for automated temperature increase of steam supplied to the turbine of TES power units and AES turbine loading, it is advisable to use programs in the form of linear dependence of velocity of changing the controlled parameter on the given value, the initial level, from which the parameter increase with a regulated velocity is realized, is given in the form of analogue dependence on the turbine prestart-up state. The programs described and the schemes of their realization have been approved at the automatization of 300 MW power unit starts up with the K-300-240 turbine and K-220-44 turbine as well as used when creating control system for turbines of 500 MW and higher for designed TPP and NPP power units

  17. Startup circuit training program reduces metabolic risk in Latino adolescents.

    Science.gov (United States)

    Davis, Jaimie Nicole; Gyllenhammer, Lauren E; Vanni, Amanda A; Meija, Mathew; Tung, Amy; Schroeder, E Todd; Spruijt-Metz, Donna; Goran, Michael I

    2011-11-01

    This study aimed to test the effects of a circuit training (CT; aerobic + strength training) program, with and without motivational interviewing (MI) behavioral therapy, on reducing adiposity and type 2 diabetes risk factors in Latina teenagers. Thirty-eight Latina adolescents (15.8 ± 1.1 yr) who are overweight/obese were randomly assigned to control (C; n = 12), CT (n = 14), or CT + MI (n = 12). The CT classes were held twice a week (60-90 min) for 16 wk. The CT + MI group also received individual or group MI sessions every other week. The following were measured before and after intervention: strength by one-repetition maximum; cardiorespiratory fitness (V·O 2max) by submaximal treadmill test; physical activity by accelerometry; dietary intake by records; height, weight, waist circumference; total body composition by dual-energy x-ray absorptiometry; visceral adipose tissue, subcutaneous adipose tissue, and hepatic fat fraction by magnetic resonance imaging; and glucose/insulin indices by fasting blood draw. Across-intervention group effects were tested using repeated-measures ANOVA with post hoc pairwise comparisons. CT and CT + MI participants, compared with controls, significantly increased fitness (+16% and +15% vs -6%, P = 0.03) and leg press (+40% vs +20%, P = 0.007). Compared with controls, CT participants also decreased waist circumference (-3% vs +3%; P < 0.001), subcutaneous adipose tissue (-10% vs 8%, P = 0.04), visceral adipose tissue (-10% vs +6%, P = 0.05), fasting insulin (-24% vs +6%, P = 0.03), and insulin resistance (-21% vs -4%, P = 0.05). CT may be an effective starter program to reduce fat depots and improve insulin resistance in Latino youth who are overweight/obese, whereas the additional MI therapy showed no additive effect on these health outcomes.

  18. Engineering analysis activities in support of susquehanna unit 1 startup testing and cycle 1 operations

    International Nuclear Information System (INIS)

    Miller, G.D.; Kukielka, C.A.; Olson, L.M.; Refling, J.G.; Roscioli, A.J.; Somma, S.A.

    1985-01-01

    The engineering analysis group is responsible for all nuclear plant systems analysis and reactor analysis activities, excluding fuel management analysis, at Pennsylvania Power and Light Company. These activities include making pretest and posttest predictions of startup tests; analyzing unplanned or unexpected transient events; providing technical training to plant personnel; assisting in the development of emergency drill scenarios; providing engineering evaluations to support design and technical specification changes, and evaluating, assessing, and resolving a number of license conditions. Many of these activities have required the direct use of RETRAN models. Two RETRAN analyses that were completed to support plant operations - a pretest analysis of the turbine trip startup test, and a posttest analysis of the loss of startup transformer event - are investigated. For each case, RETRAN results are compared with available plant data and comparisons are drawn on the acceptability of the performance of the plant systems

  19. Program of RA reactor start-up to nominal power; Program dizanja reaktora 'RA' na nominalnu snagu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1959-07-01

    The zero start-up program is followed by the program of RA reactor start-up to nominal power. This program is desed in detail and includes the following measurements: radiation characteristics at the exit of the channels; gamma and fast neutron dose distribution in the reactor; influence of absorbers on the reactivity; temperature effect; absolute flux and calibration of ionization chambers; xenon effect; thermal and hydraulics; dosimetry around the reactor; neutron flux in the reactor core and in the reactor hall; heavy water level; thermal characteristics after shutdown. A list of measuring devices and instrumentation is included with the detailed action plan and list of responsible staff members.

  20. Initial Start-Up and Testing of the Fort St. Vrain HTGR – Lessons Learned which May Be Useful for the HTR-PM

    International Nuclear Information System (INIS)

    Brey, H.L.

    2014-01-01

    Although the activities presented in this paper occurred 40 years ago, there are many observations and lessons associated with Fort St. Vrain (FSV) which may be beneficial in support of the start-up, testing and licensing of the HTR-PM. This report includes a review of the FSV NPP design including an overview of the requirements and testing program utilized to bring the plant from initial start-up to full power. A sampling of the test results as well as a comparison of the plant design characteristics to actual values achieved at 100% power along with selected overall experiences gained through operation of this plant is also included. (author)

  1. Simulations and field tests of a reactor coolant pump emergency start-up by means of remote gas units

    International Nuclear Information System (INIS)

    Omahen, P.; Gubina, F.

    1992-01-01

    The problem of the reactor coolant pump start-up in case of emergency by means of remote gas power plant units was analyzed. In this paper a simulation model is developed which enabled a detailed simulation of the transient process occurring at the start-up. The start-up of the RCP motor set was simulated in case of available one and two gas units. The field tests were performed and the measured variable values complied well with the simulation results. Two gas units have been determined as a safe start-up scheme of the RCP motor set considering for safety reasons accepted busbars and motor protection settings. A derived model for deep rotor bars was experimentally confirmed as effective means for the RCP motor set start-up transient simulation. Start-up procedures have been designed and adopted to the safety procedures of the Nuclear Power Plant Krsko

  2. Startup physics tests at Temelin NPP, Unit 1

    International Nuclear Information System (INIS)

    Sedlacek, M.; Minarcin, M.; Toth, L.; Elko, M.; Hascik, R.

    2002-01-01

    The objective, scope and proceedings of the physics tests of Temelin NPP, Unit 1 physical commissioning are given in this paper. Furthermore, some results of selected physics tests are presented: reactor initial criticality test, determination of reactor power range for physics testing, measurement of control rod cluster assembly group no. 10 reactivity worth in case of limitation system LS(a) actuation, control rod cluster assembly system reactivity worth measurement with single rod cluster assembly of greatest reactivity worth stuck in fully withdrawn position, measurement of differential reactivity worth of control rod cluster assembly group no. 9, boron 'endpoint' determination and measurement of power reactivity coefficient (Authors)

  3. Phased Startup Initiative Phase 3 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, loaded into the Primary Clean Machine (PCM) for fuel cleaning, fuel sorted on the Process Table, then loaded back into fuel canisters and relocated in Basin Storage. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a base line to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  4. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, and loaded into the Primary Clean Machine (PCM) for fuel cleaning; and that fuel can be sorted on the Process Table, then loaded back into fuel canisters and relocated in basin storage. An option is included to load selected elements into multi-canister overpack (MCO) Fuel Baskets. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a baseline to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  5. Argonne National Laboratory's photo-oxidation organic mixed waste treatment system - installation and startup testing

    International Nuclear Information System (INIS)

    Shearer, T.L.; Nelson, R.A.; Torres, T.; Conner, C.; Wygmans, D.

    1997-01-01

    This paper describes the installation and startup testing of the Argonne National Laboratory (ANL-E) Photo-Oxidation Organic Mixed Waste Treatment System. This system will treat organic mixed (i.e., radioactive and hazardous) waste by oxidizing the organics to carbon dioxide and inorganic salts in an aqueous media. The residue will be treated in the existing radwaste evaporators. The system is installed in the Waste Management Facility at the ANL-E site in Argonne, Illinois. 1 fig

  6. Radioactive acid digestion test unit nonradioactive startup operations

    International Nuclear Information System (INIS)

    Allen, C.R.; Cowan, R.G.; Crippen, M.D.; Divine, J.R.

    1978-05-01

    The Radioactive Acid Digestion Test Unit (RADTU) will process 5 kg/hour of combustible solid waste and is designed to handle almost all solid combustible waste found in plutonium processing with plutonium contamination levels up to scrap. The RADTU is designed with special safety features to safely contain high masses of fissile materials and to safely handle unusual materials and reactive chemicals which may find their way into the waste. Nonradioactive operating experience to date has been very satisfactory. RADTU has been operated for extended runs on both a 24-hour per day basis as well as on a one shift per day basis. Some minor operating problems have been encountered as expected in a shakedown operation. In general, solutions to these have been readily found. 12 figures

  7. Development of data processing system for the start-up test of FUGEN

    International Nuclear Information System (INIS)

    Nakajima, Ichiro; Kato, Hidemasa

    1981-01-01

    The data processing in the start-up test of conventional reactors has been carried out by recording data with transient phenomena recorders (e.g. electromagnetic oscillographs) or analog data recorders. On the other hand, the rapid works for detailed comparison and investigation between the test data and the analyzed results have been indispensable because ''Fugen'' is a new type of reactor, for which the results in conventional reactors did not necessarily serve as reference. Therefore, in the start-up test of the ''Fugen'' plant, the test data processing and the forecast analysis were performed by installing on the site a mini-computer capable of independently processing the test data and a terminal equipment connected to a large computer with a special communication line. As soon as the testing was completed, the comparison of the test data with the forecast analysis was presented on a graphic display (CRT), and the analysis was modified until significant differences did not appear between the test data and the analyzed data. In this paper, the system hardware and software are described, and two functions of forecast analysis and test data processing are explained. The time required for printing-out or graphic display from inputting 600 kB analysis code data using the terminal equipment was 10 to 30 minutes, and the evaluation and investigation for the test results were able to be immediately achieved by the data processing using the mini-computer. This is one of the factors to carry out the start-up test satisfactorily together with the forecast analysis works. (Wakatsuki, Y.)

  8. Assessment of Startup Fuel Options for a Test or Demonstration Fast Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Carmack, Jon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hayes, Steven [Idaho National Lab. (INL), Idaho Falls, ID (United States); Walters, L. C. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    This document explores startup fuel options for a proposed test/demonstration fast reactor. The fuel options considered are the metallic fuels U-Zr and U-Pu-Zr and the ceramic fuels UO2 and UO2-PuO2 (MOX). Attributes of the candidate fuel choices considered were feedstock availability, fabrication feasibility, rough order of magnitude cost and schedule, and the existing irradiation performance database. The reactor-grade plutonium bearing fuels (U-Pu-Zr and MOX) were eliminated from consideration as the initial startup fuels because the availability and isotopics of domestic plutonium feedstock is uncertain. There are international sources of reactor grade plutonium feedstock but isotopics and availability are also uncertain. Weapons grade plutonium is the only possible source of Pu feedstock in sufficient quantities needed to fuel a startup core. Currently, the available U.S. source of (excess) weapons-grade plutonium is designated for irradiation in commercial light water reactors (LWR) to a level that would preclude diversion. Weapons-grade plutonium also contains a significant concentration of gallium. Gallium presents a potential issue for both the fabrication of MOX fuel as well as possible performance issues for metallic fuel. Also, the construction of a fuel fabrication line for plutonium fuels, with or without a line to remove gallium, is expected to be considerably more expensive than for uranium fuels. In the case of U-Pu-Zr, a relatively small number of fuel pins have been irradiated to high burnup, and in no case has a full assembly been irradiated to high burnup without disassembly and re-constitution. For MOX fuel, the irradiation database from the Fast Flux Test Facility (FFTF) is extensive. If a significant source of either weapons-grade or reactor-grade Pu became available (i.e., from an international source), a startup core based on Pu could be reconsidered.

  9. Ejected control rod and rods drop measurements during Mochovce startup physical tests

    International Nuclear Information System (INIS)

    Minarcin, Miroslav; Elko, Marek

    1998-01-01

    Paper deals with measurements of asymmetric reactivity insertion into the reactor core that were carried out during physical startup tests of Mochovce Unit 1 in June 1998. Control rods worth measurements with one and two rods s tucked in upper limit and worth measurement of one control rod from group 6 'ejected' from the reactor core are discussed. During the experiments neutron flux was measured by four ionisation chambers (three of them were placed symmetrically around the reactor core). Results of measurements and influence of asymmetric reactivity influence on ionisation chambers response are presented in the paper. (Authors)

  10. Tests of arc-welding-related EMI effects on startup instrumentation

    International Nuclear Information System (INIS)

    Qian, T.; Kalechstein, W.; Cosgrove, D.

    1996-01-01

    The tests described in this paper were conducted to characterize the effects that electromagnetic interference (EMI), from arc welding, has on startup instrumentation (SUI). This paper reviews the results of a literature search on EMI resulting from arc welding and gives the objective and scope of the tests conducted and describes the test equipment and setting, and test procedure and results. Are-welding-related EMI levels in an SUI system were measured to determine the dominant source of interference, the coupling path and the susceptible part of the SUI system. The effectiveness of easily implemented improvements in reducing the level of EMI in the SUI system were also tested. Recommendations are provided on how to eliminate or reduce the EMI effects on sensitive nuclear instruments. (author)

  11. 45 CFR 309.150 - What start-up costs are allowable for Tribal IV-D programs carried out under § 309.65(b) of this...

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false What start-up costs are allowable for Tribal IV-D... ENFORCEMENT (IV-D) PROGRAM Tribal IV-D Program Funding § 309.150 What start-up costs are allowable for Tribal... $500,000, unless additional funding is provided pursuant to § 309.16(c). Allowable start-up costs and...

  12. Start-up and Self-sustain Test of 500 W Ultra-Micro Gas Turbine Generator

    International Nuclear Information System (INIS)

    Seo, Jeong Min; Park, Jun Young; Choi, Bum Seog

    2013-01-01

    This paper provides the performance test for start-up and self-sustaining of 500W ultra-micro gas turbine (UMGT) generator. Each component of UMGT, a centrifugal compressor, a radial turbine, an annular combustor and a shaft is already designed, manufactured and tested to meet design requirements in previous researches. However, they are not tested to work in an integrate system. Currently, integrated test unit with a compressor, a combustor and a turbine, is developed to find the proper condition of start-up and self-sustain. Ignition sequence depending on rotating speed is designed. Performance test for start-up and self-sustain is designed based on the ignition possible condition. An air impingement starter and a hot bulb inginer are applied. LPG is used as main fuel

  13. Startup tests for TRIGA-ACPR at the Japan Atomic Energy Research Institute

    International Nuclear Information System (INIS)

    West, G.; Whittemore, W.

    1976-01-01

    The JAERI ACPR TRIGA startup tests involved procedures somewhat different from those considered standard for TRIGA. While the approach to critical followed standard procedures, the tests involving (1) the core loading to the permitted excess reactivity, and (2) the calibration of the 11 control rods (six Reg, two Safety, three Transient rods) were somewhat unusual. The power calibration involved three techniques: reactor noise analysis, flux foil activation, and calorimetry. The pulsing tests involved the insertion of increasing amounts of excess reactivity until the predicted performance was reached with a total insertion of $4.70. For,this the peak measured fuel temperature was 850 o C, and the integrated prompt energy release was about 100 megawatt-second, both in good agreement with predictions. (author)

  14. The Main Tendencies in the Development of Startup Projects as a Form of Innovative-Creative Enterprises in the Ukrainian Computer Programming Market

    Directory of Open Access Journals (Sweden)

    Garafonova Olga I.

    2017-10-01

    Full Text Available The article is aimed at studying the main tendencies in the development of startup projects as a form of innovative-creative enterprises in the Ukrainian computer programming market. A definition of «innovative-creative enterprises» has been proposed, the main features of startups as a form of innovative-creative enterprises has been considered. The directions of development of the computer programming market were analyzed, considering the most significant future trends, products and services in the computer programming sector. An analysis of startups in the Ukrainian computer programming market, based on the volume of investments made, was carried out. A model for the development of startup projects as a form of innovative-creative enterprises has been designed. The unfamiliar promising spheres, wherein have not yet been launched startups in the Ukrainian computer programming market, have been indicated.

  15. Upgrade the startup test instrumentation (ANMS) with innovated I and C system at the Dukovany WWER 440/213 units

    International Nuclear Information System (INIS)

    Kocek, V.

    2005-01-01

    The paper focuses on the innovation procedures of physics startup tests instrumentation used in Dukovany NPP (ANMS) connected with I and C system refurbishment of the Dukovany WWER 440/213 units. The following matters are further discussed in this paper: a) changes in ANMS design, whose has been carried out due to reflect the situation connected with I and C innovation; b) process of consistency checking during implementation stage; c) results of the physics startup tests with upgraded ANMS in 2005 (introduction of Gd2 fuel on Dukovany NPP) (Authors)

  16. Development of Start-up and Shutdown Procedure for the HANARO Fuel Test Loop

    International Nuclear Information System (INIS)

    Park, S. K.; Sim, B. S.; Chi, D. Y.; Lee, J. M.; Lee, C. Y.; Ahn, S. H.

    2009-06-01

    A start-up and shutdown procedure for the HANARO fuel test loop has been developed. This is a facility for fuel and material irradiation tests. The facility provides experimental conditions similar to the normal operational pressures and temperatures of commercial PWR and CANDU plants. The normal operation modes of the HANARO fuel test loop are classified into loop shutdown, cold stand-by 1, cold stand-by 2, hot stand-by, and hot operation. The operation modes depend on the fission power of test fuels and the coolant temperature at the inlet of the in-pile test section. The HANARO must maintain a shutdown mode if the HANARO fuel test loop is loop shutdown, cold stand-by 1, cold stand-by 2, or hot stand-by. As the HANARO becomes power operation mode, the operation mode of the HANARO fuel test loop comes to hot operation from hot stand-by. The procedure for the HANARO fuel test loop consists of four main parts such as check of initial conditions, stat-up operation procedure, shutdown operation procedure, and check lists for operations. Several hot test operations ensure that the procedure is appropriate

  17. Preparations for the start-up of a research program in nuclear safeguards at Chalmers

    International Nuclear Information System (INIS)

    Avdic, Senada; Pazsit, Imre

    2004-03-01

    The Department of Reactor Physics at Chalmers University of Technology plans to start-up a research program in nuclear safeguards and nuclear material management. The program is aimed at utilizing the experimental facilities as well as the experience in reactor physics, criticality safety, signal processing and unfolding, and experimental nuclear techniques, in tackling problems in non-destructive assay (NDA) of nuclear materials. For the introductory part of this program, support has been received from the Swedish Nuclear Power Inspectorate to host Dr. Senada Avdic, University of Tuzla, Bosnia, as a post-doc for three months to participate in the preparatory program. The preparations were focussed on a survey of existing active non-destructive assay methods and preparations of their application in the experimental and theoretical/calculational research of our Department. The methods surveyed comprise - the use of a 252 Cf source in active NDA measurements; - planning of an experiment with the existing equipments of the Department; - time correlation measurements with a 252 Cf source and/or a 252 Cf detector; - Monte Carlo simulations of the time correlations between gammas and neutrons from a measurement with a 252 Cf detector: the MCNP-PoliMi code; - Identification of fissile material (enrichment/mass) with 252 Cf measurements; the use of various unfolding techniques (artificial neural networks) for identifying nuclear parameters; use of neutron activation analysis with a neutron generator for determination of distribution of material in an unknown sample; - determination of fissile material content by measurements of delayed neutrons

  18. Recent operating experience during startup testing at latest 1100 MWe BWR-5 nuclear power plants

    International Nuclear Information System (INIS)

    Tanabe, Akira; Tateishi, Mizuo; Kajikawa, Makoto; Hayase, Yuichi.

    1986-01-01

    In June and September 1985, the latest two 1100 Mwe BWR-5 nuclear power plants started commercial operation about ten days earlier than initially expected without any unscheduled shutdown. These latest plants, 2F-3 and K-1, are characterized by an improved core with new 8 x 8 fuel assemblies, highly reliable control systems, advanced control room system and turbine steam full bypass system for full load rejection (2F3). This paper describes the following operating experiences gained during their startup testing. 1) Continuous operation at full load rejection. 2) Stable operation at natural circulating flow condition. 3) 31 and 23 hour short time start up operation. 4) 100-75-100 %, 1-8-1-14 hours daily load following operation. (author)

  19. Preparations for the start-up of a research program in nuclear safeguards at Chalmers - Stage 2

    Energy Technology Data Exchange (ETDEWEB)

    Kitamura, Yasunori; Pazsit, Imre

    2004-12-01

    This report gives an account of the work performed at the Dept. of Reactor Physics at Chalmers Univ. of Technology in the second stage of the preparations for the start-up of a research program in nuclear safeguards and nuclear material management. The program is aimed at utilizing the experimental facilities as well as the experience in reactor physics, criticality safety, signal processing and unfolding, and experimental nuclear techniques, in tackling problems in non-destructive assay (NDA) of nuclear materials. During the present project, the following three main subjects were dealt with: first tests and pilot measurements were performed with one of the two newly acquired {sup 252}Cf detectors that were obtained from JNC Japan; the second exercise of the ESARDA benchmark. which consisted of the evaluation of the pulse train generated by Los Alamos Laboratory for multiplicity counting was performed and reported to the organisers of the benchmark; the modified Monte-Carlo code MCNP-PoliMi was installed, tested and work started for generating (although outside the ESARDA benchmark), pulse train data as obtained from various neutron sources with or without the presence of fissile material, as detected with an Active Well Coincidence Counter.

  20. Preparations for the start-up of a research program in nuclear safeguards at Chalmers - Stage 2

    International Nuclear Information System (INIS)

    Kitamura, Yasunori; Pazsit, Imre

    2004-12-01

    This report gives an account of the work performed at the Dept. of Reactor Physics at Chalmers Univ. of Technology in the second stage of the preparations for the start-up of a research program in nuclear safeguards and nuclear material management. The program is aimed at utilizing the experimental facilities as well as the experience in reactor physics, criticality safety, signal processing and unfolding, and experimental nuclear techniques, in tackling problems in non-destructive assay (NDA) of nuclear materials. During the present project, the following three main subjects were dealt with: first tests and pilot measurements were performed with one of the two newly acquired 252 Cf detectors that were obtained from JNC Japan; the second exercise of the ESARDA benchmark. which consisted of the evaluation of the pulse train generated by Los Alamos Laboratory for multiplicity counting was performed and reported to the organisers of the benchmark; the modified Monte-Carlo code MCNP-PoliMi was installed, tested and work started for generating (although outside the ESARDA benchmark), pulse train data as obtained from various neutron sources with or without the presence of fissile material, as detected with an Active Well Coincidence Counter

  1. Preparations for the start-up of a research program in nuclear safeguards at Chalmers

    Energy Technology Data Exchange (ETDEWEB)

    Avdic, Senada; Pazsit, Imre

    2004-03-01

    The Department of Reactor Physics at Chalmers University of Technology plans to start-up a research program in nuclear safeguards and nuclear material management. The program is aimed at utilizing the experimental facilities as well as the experience in reactor physics, criticality safety, signal processing and unfolding, and experimental nuclear techniques, in tackling problems in non-destructive assay (NDA) of nuclear materials. For the introductory part of this program, support has been received from the Swedish Nuclear Power Inspectorate to host Dr. Senada Avdic, University of Tuzla, Bosnia, as a post-doc for three months to participate in the preparatory program. The preparations were focussed on a survey of existing active non-destructive assay methods and preparations of their application in the experimental and theoretical/calculational research of our Department. The methods surveyed comprise - the use of a {sup 252}Cf source in active NDA measurements; - planning of an experiment with the existing equipments of the Department; - time correlation measurements with a {sup 252}Cf source and/or a {sup 252}Cf detector; - Monte Carlo simulations of the time correlations between gammas and neutrons from a measurement with a {sup 252}Cf detector: the MCNP-PoliMi code; - Identification of fissile material (enrichment/mass) with {sup 252}Cf measurements; the use of various unfolding techniques (artificial neural networks) for identifying nuclear parameters; use of neutron activation analysis with a neutron generator for determination of distribution of material in an unknown sample; - determination of fissile material content by measurements of delayed neutrons.

  2. Assessment study of RELAP5/MOD2, CYCLE 36. 04 based on spray start-up test for DOEL-4

    Energy Technology Data Exchange (ETDEWEB)

    Moeyaert, P.; Stubbe, E.

    1989-07-01

    This report presents an assessment study for the code RELAP-5 MOD-2 based on a pressurizer spray start-up test of the Doel-4 power plant. Doel-4 is a three loop WESTINGHOUSE PWR plant ordered by the EBES utility with a nominal power rating of 1000 MWe and equipped with preheater type E steam generators. A large series of commissioning tests are normally performed on new plants, of which the so called pressurizer spray and heater test (SU-PR-01) was performed on February 2nd 1985. TRACTEBEL, being the Architect-Engineer for this plant was closely involved with all start-up tests and was responsible for the final approval of the tests.

  3. THE MURMANSK INITIATIVE - RF: COMPLETING CONSTRUCTION AND START-UP TESTING

    International Nuclear Information System (INIS)

    CZAJKOWSKI, C.; BOWERMAN, B.S.; DYER, R.S.; SORLIE, A.A.; WESTER, D.

    1998-01-01

    The Murmansk Initiative - RF was instigated to address Russia's ability to meet the London Convention prohibiting ocean dumping of radioactive waste. The Initiative, under a trilateral agreement, will upgrade an existing low-level liquid radioactive waste treatment facility, increasing capacity from 1,200 m 3 /year to 5,000 m 3 /year, and expand the capability to treat liquids containing salt (up to 10 g/L). The three parties to the agreement, the Russian Federation, Norway, and the US, have split the costs for the project. All construction has been provided by Russia. Construction of mechanical systems (piping and valves, pumps, sorbent columns, settling tanks, surge tanks) is nearly complete, with instrumentation and control (I+C) systems the last to be installed. Delays to the I+C installation have occurred because changes in system specifications required some additional US-supplied computer control equipment to be purchased, and clearance through customs (both US and Russian) has been slow. Start-up testing has been limited to testing of some isolated sub-systems because of the delays in I+C installation. Final construction activities are also hampered by the current state of the Russian economy. The specific impact has been completion of the cementation unit, which was not funded under the trilateral agreement (but funded by the Russian government). Russian regulatory authorities have stated that final licensing for expanded capacity (5,000 m 3 /year) will not be given until the cementation unit is on-line

  4. Results of physics start-up tests of Mochovce and Bohunice units with 2-nd generation Gd fuel (average enrichment 4.87 %)

    International Nuclear Information System (INIS)

    Polakovic, F.

    2015-01-01

    There are presented main features of the fuel and the list of experimental neutron-physical characteristics measured during physics start-up tests.All together there were carried out 14 physics start-ups at Bohunice and Mochovce Units with the new type of fuel. Differences between theoretical and experimental neutron-physical characteristics were statistically processed and compared with the tests acceptance criteria. There are summarized results of reactor physics start-ups with 2-nd generation Gd fuel usage [ru

  5. Training Future Entrepreneurs Using European Funds. A Descriptive Research on Start-Up Romania Programs

    Directory of Open Access Journals (Sweden)

    Cristina Nicolau

    2016-01-01

    Full Text Available This paper focuses on the mutual relationship among the concepts of entrepreneurship, trainingpersonnel and business start-up and development. From our point of view, Romania shallencourage as much as possible entrepreneurship so as to create SMEs, the most flexible andnumerous in number in the Romanian total number of companies. Hence, the main objective of thispaper is to highlight the importance of accessing European funds in increasing the number ofRomanians properly trained so as to become successful entrepreneurs and to manage successfulbusinesses. At the same time, another main objective is to present the need of entrepreneurshiptraining and support in business start-up and development by using the descriptive method ofresearch.

  6. Start-up tests of Kashiwazakikariwa Nuclear Power Station Unit No.2 and No.5

    International Nuclear Information System (INIS)

    Fueki, Kensuke; Aoki, Shiro; Tanaka, Yasuhisa; Yahagi, Kimitoshi

    1991-01-01

    The Kashiwazakikariwa Nuclear Power Station Units No.5 and No.2 started commercial operation on April 10 and September 28 of 1990 respectively. As the result of the application of the First and Second LWR Improvement and Standardization Program, the plants were designed aiming at improvement of reliability, operation, and maintenance while maintaining safety. Construction of the plants took 6.5 to 7 years for completion, during which period the last 10 months were spent for the start up tests program. Start up tests were carried out under deliberate management to assure that the plants can operate safely and steadily at the prescribed operating points, and the schedules and tests item modifications adopted in Unit No.2 and No.5 were verified under the start up tests program. (author)

  7. The Family Startup Program: study protocol for a randomized controlled trial of a universal group-based parenting support program.

    Science.gov (United States)

    Trillingsgaard, Tea; Maimburg, Rikke Damkjær; Simonsen, Marianne

    2015-04-21

    Inadequate parenting is an important public health problem with possible severe and long-term consequences related to child development. We have solid theoretical and political arguments in favor of efforts enhancing the quality of the early family environment in the population at large. However, little is known about effect of universal approaches to parenting support during the transition to parenthood. This protocol describes an experimental evaluation of group based parenting support, the Family Startup Program (FSP), currently implemented large scale in Denmark. Participants will be approximately 2500 pregnant women and partners. Inclusion criteria are parental age above 18 and the mother expecting first child. Families are recruited when attending routine pregnancy scans provided as a part of the publicly available prenatal care program at Aarhus University Hospital, Skejby. Families are randomized within four geographically defined strata to one of two conditions a) participation in FSP or b) Treatment As Usual (TAU). FSP aims to prepare new families for their roles as parents and enhance parental access to informal sources of support, i.e. social network and community resources. The program consists of twelve group sessions, with nine families in each group, continuing from pregnancy until the child is 15 months old. TAU is the publicly available pre- and postnatal care available to families in both conditions. Analyses will employ survey data, administrative data from health visitors, and administrative register based data from Statistics Denmark. All data sources will be linked via the unique Danish Civil Registration Register (CPR) identifier. Data will be obtained at four time points, during pregnancy, when the child is nine months, 18 months and seven years. The primary study outcome is measured by the Parenting Sense of Competence scale (PSOC) J Clin Child Psychol 18:167-75, 1989. Other outcomes include parenting and couple relationship quality

  8. Assessment of full power turbine trip start-up test for C. Trillo 1 with RELAP5/MOD2

    International Nuclear Information System (INIS)

    Lozano, M.F.; Moreno, P.; de la Cal, C.; Larrea, E.; Lopez, A.; Santamaria, J.G.; Lopez, E.; Novo, M.

    1993-07-01

    C. Trillo I has developed a model of the plant with RELAP5/MOD2/36.04. This model will be validated against a selected set of start-up tests. One of the transients selected to that aim is the turbine trip, which presents very specific characteristics that make it significantly different from the same transient in other PWRs of different design, the main difference being that the reactor is not tripped: a reduction in primary power is carried out instead. Pre-test calculations were done of the Turbine Trip Test and compared against the actual test. Minor problems in the first model, specially in the Control and Limitation Systems, were identified and post-test calculations had been carried out. The results show a good agreement with data for all the compared variables

  9. Start-up physics test predictions for Indian Point 3, cycle 7, utilized PHOENIX-P/ANC

    International Nuclear Information System (INIS)

    Powers, M.A.; Buechel, R.J.

    1989-01-01

    The Westinghouse Advanced In-Core Fuel Management System (PHOENIX-P/ANC) was utilized to predict start-up physics test parameters for Indian Point 3 (IP3) cycle 7. This core utilizes a low-leakage loading pattern implementing VANTAGE-5 fuel, which incorporates axial blankets and integral fuel burnable absorbers. Discrete part-length wet annular burnable absorbers (WABAs) are used in some feed assemblies as well. As a measure to reduce vessel fluence, certain peripheral twice-burned assemblies also contain fresh full-length WABAs. The New York Power Authority (NYPA) is using the Westinghouse code system since the methodology was licensed by the U.S. Nuclear Regulatory Commission and because of the user support supplied by Westinghouse. The IP3 cycle 7 PHOENIX-P/ANC model was developed as a joint effort by NYPA and Westinghouse as part of a technology transfer agreement. The PHOENIX-P/ANC model performed very well in start-up physics test predictions and is expected to agree well through cycle depletion. These results have given NYPA further incentive to use the Westinghouse methodology for core follow, loading pattern design determination, and in the safety analysis area

  10. Relay test program

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.; Kunkel, C.; Shteyngart, S.

    1994-02-01

    This report presents the results of a relay test program conducted by Brookhaven National Laboratory (BNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC). The program is a continuation of an earlier test program the results of which were published in NUREG/CR-4867. The current program was carried out in two phases: electrical testing and vibration testing. The objective was primarily to focus on the electrical discontinuity or continuity of relays and circuit breaker tripping mechanisms subjected to electrical pulses and vibration loads. The electrical testing was conducted by KEMA-Powertest Company and the vibration testing was performed at Wyle Laboratories, Huntsville, Alabama. This report discusses the test procedures, presents the test data, includes an analysis of the data and provides recommendations regarding reliable relay testing

  11. Simulation of the transient behaviour of the Mulheim-Karlich nuclear power station and comparison with startup tests

    International Nuclear Information System (INIS)

    Burchhardt, W.; Weber, J.P.

    1987-01-01

    Among the startup tests of the Mulheim-Karlich nuclear power station an anticipated turbine trip and a rector trip have been performed. Calculations have been done for both tests by the authors using the computer codes DYNODE-P and ALMOD4. At a given reactor power the transient behavior of the plant is determined by the heat load of the once-through steam generators (OTSG), which in turn is governed by the integral control system. As expected the behavior of the plant after the trips can be exactly reproduced only if the bypass control system is completely modelled. In addition the heat transfer to the secondary side of the OTSG which governs the steam production has to be calculated close to reality. comparing the calculated results with the measured test data it is demonstrated that either code can be used to reproduce the transient behavior of the plant

  12. Lean start-up

    DEFF Research Database (Denmark)

    Rasmussen, Erik Stavnsager; Tanev, Stoyan

    2016-01-01

    The risk of launching new products and starting new firms is known to be extremely high. The Lean Start-up approach is a way of reducing these risks and enhancing the chances for success by validating the products and services in the market with customers before launching it in full scale. The ma...... and the final business model. In other words: The start-up must first nail the problem together with the customers, then develop the solution and test, and then in the end scale it to a full-grown business model.......The risk of launching new products and starting new firms is known to be extremely high. The Lean Start-up approach is a way of reducing these risks and enhancing the chances for success by validating the products and services in the market with customers before launching it in full scale. The main...

  13. Preparing for electrical-system startup at a nuclear power plant

    International Nuclear Information System (INIS)

    Boissy, G.J.

    1977-01-01

    Experience at St Lucie Unit No. 1 nuclear power plant regarding organization for electrical startup is related and analyzed. Problems of staffing, organization procedures, test standard development, and implementation of the program are considered

  14. Knowledge Management at the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Wootan, David; Omberg, Ron

    2013-01-01

    Conclusions: • Accessibility of information from FFTF has been substantially increased; • FFTF Startup Test information available – FFTF had a disciplined, organized approach; • Extensive Startup Characterization program data available; • Extensive Passive safety testing data available

  15. Startup of the FFTF sodium cooled reactor

    International Nuclear Information System (INIS)

    Redekopp, R.D.; Umek, A.M.

    1981-03-01

    The Fast Flux Test Facility (FFTF), located on the Department of Energy (DOE) Hanford Reservation near Richland, Washington, is a 3 Loop 400 MW(t) sodium cooled fast reactor with a primary mission to test fuels and materials for development of the Liquid Metal Fast Breeder Reactor (LMFBR). Bringing FFTF to a condition to accomplish this mission is the goal of the Acceptance Test Program (ATP). This program was the mechanism for achieving startup of the FFTF. Highlights of the ATP involving the system inerting, liquid metal and inerted cell testing and initial ascent to full power are discussed

  16. Surry Power Station, Units 1 and 2. Annual operating report for 1976, section 2: core performance and startup physics test reports

    International Nuclear Information System (INIS)

    1977-01-01

    The analyses of four core performance indicators including burnup distribution, reactivity depletion, power distribution, and primary coolant activity are discussed. Information is presented concerning fuel densification monitoring; start-up physics testing; and James River temperature, salinity, fish, biota, and plankton entrainment monitoring

  17. Insertion of control systems models in the Almod 3 computer code for the simulation of Angra I reactor start-up tests

    International Nuclear Information System (INIS)

    Camargo, C.T.M.

    1981-09-01

    The Almod 3 computer code was modified, aiming at the simulation of Angra I nuclear power plant behavior during some reactor start-up tests. The results obtained with the modified computer code (Almod 3W) are compared with those obtained with the Retran computer code. (E.G.) [pt

  18. Engineering Work Plan for the Development of Phased Startup Initiative (PSI) Phases 3 and 4 Test Equipment

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    A number of tools and equipment pieces are required to facilitate planned test operations during Phases 3 and 4 of the Phased Startup Initiative (PSI). These items will be used in assessing residual canister sludge quantities on cleaned fuel assemblies, sorting coarse and fine scrap fuel pieces, assessing the size distribution of scrap pieces, loading scrap into a canister, and measuring the depth of the accumulated scrap in a canister. This work plan supercedes those previously issued for development of several of these test items. These items will be considered prototype equipment until testing has confirmed their suitability for use in K West Basin. The process described in AP-EN-6-032 will be used to qualify the equipment for facility use. These items are considered non-OCRWM for PSI Phase 3 applications. The safety classification of this equipment is General Service, with Quality Level 0 (for PSI Phase 3). Quality Control inspections shall be performed to verify basic dimensions and overall configurations of fabricated components, and any special quality control verifications specified in this work plan (Section 3.1.5). These inspections shall serve to approve the test equipment for use in K West Basin (Acceptance Tag). This equipment is for information gathering only during PSI Phases 3 and 4 activities, and will be discarded at the completion of PSI. For equipment needed to support actual production throughput, development/fabrication/testing activities would be more rigorously controlled

  19. Startup, testing, and operation of the Santa Clara 2MW direct carbonate fuel cell demonstration plant

    Energy Technology Data Exchange (ETDEWEB)

    Skok, A.J.; Leo, A.J. [Fuel Cell Engineering Corp., Danbury, CT (United States); O`Shea, T.P. [Santa Clara Demonstration Project, CA (United States)

    1996-12-31

    The Santa Clara Demonstration Project (SCDP) is a collaboration between several utility organizations, Fuel Cell Engineering Corporation (FCE), and the U.S. Dept. Of Energy aimed at the demonstration of Energy Research Corporation`s (ERC) direct carbonate fuel cell (DFC) technology. ERC has been pursuing the development of the DFC for commercialization near the end of this decade, and this project is an integral part of the ERC commercialization effort. The objective of the Santa Clara Demonstration Project is to provide the first full, commercial scale demonstration of this technology. The approach ERC has taken in the commercialization of the DFC is described in detail elsewhere. An aggressive core technology development program is in place which is focused by ongoing interaction with customers and vendors to optimize the design of the commercial power plant. ERC has selected a 2.85 MW power plant unit for initial market entry. Two ERC subsidiaries are supporting the commercialization effort: the Fuel Cell Manufacturing Corporation (FCMC) and the Fuel Cell Engineering Corporation (FCE). FCMC manufactures carbonate stacks and multi-stack modules, currently from its production facility in Torrington, CT. FCE is responsible for power plant design, integration of all subsystems, sales/marketing, and client services. FCE is serving as the prime contractor for the design, construction, and testing of the SCDP Plant. FCMC has manufactured the multi-stack submodules used in the DC power section of the plant. Fluor Daniel Inc. (FDI) served as the architect-engineer subcontractor for the design and construction of the plant and provided support to the design of the multi-stack submodules. FDI is also assisting the ERC companies in commercial power plant design.

  20. Manipulator comparative testing program

    International Nuclear Information System (INIS)

    Draper, J.V.; Handel, S.J.; Sundstrom, E.; Herndon, J.N.; Fujita, Y.; Maeda, M.

    1986-01-01

    The Manipulator Comparative Testing Program examined differences among manipulator systems from the United States and Japan. The manipulator systems included the Meidensha BILARM 83A, the Model M-2 of Central Research Laboratories Division of Sargent Industries (CRL), and the GCA Corporation PaR Systems Model 6000. The site of testing was the Remote Operations Maintenance Demonstration (ROMD) facility, operated by the Fuel Recycle Division in the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory (ORNL). In all stages of testing, operators using the CRL Model M-2 manipulator had consistently lower times to completion and error rates than they did using other machines. Performance was second best with the Meidensha BILARM 83A in master-slave mode. Performance with the BILARM in switchbox mode and the PaR 6000 manipulator was approximately equivalent in terms of criteria recorded in testing. These data show no impact of force reflection on task performance

  1. A study on the effect of gamma background in low power startup physics tests

    International Nuclear Information System (INIS)

    Bae, Chang Joon; Lee, Ki Bog

    1993-01-01

    Low power physics tests should be performed for the domestic pressurized light water reactors (PWRs) after refueling. The tests are performed to ensure that operating characteristics of the core are consistent with predictions and that the core can be operated as designed. But in some low power physics tests, slow but steady reactivity increasing phenomena were noticed after step reactivity insertion by the control rod movement. These reactivity increasing phenomena are due to the low flux level and the gamma backgroud because an uncompensated ion chamber (UIC) is used as the ex-core neutron detector. The gamma background may affect the results of the low power physics tests. The aims of this paper are to analyze the grounds of such phenomena, to simulate a reference bank worth measurement test and to present a resolution quantitatively. In this study, the gamma background level was estimated by numerically solving the point kinetics equations accounting the gamma background effect. The reactivity computer check test was simulated to verify the model. Also, an appropriate neutron flux level was determined by simulating the reference bank worth measurement test. The determined neutron flux level is approximately 0.3 of the nuclear heating flux. This level is about 3 times as high as the current test upper limit specified in the test procedure. Then, the findings from this work were successfully applied to Kori unit 4 cycle 7 and Yonggwang unit 1 cycle 7 physics tests. (Author)

  2. Start-up procedure

    International Nuclear Information System (INIS)

    Marchl, A.; Krebs, W.D.; Aleite, W.

    1975-01-01

    The start-up procedure will be shown on a pressurized water reactor, although most of the activities will occur similarly in other reactor types. The commissioning time can be divided into 5 sections, the phases A to E together lasting 26 months. Subsequently there are a test run of one month and the handling-over of the plant to the operator. A survey of the commissioning sections with several important main events is shown. (orig./TK) [de

  3. Tokamak reactor startup power

    International Nuclear Information System (INIS)

    Weldon, D.M.; Murray, J.G.

    1983-01-01

    Tokamak startup with ohmic heating (OH)-induced voltages requires rather large voltages and power supplies. On present machines, with no radiofrequency (rf)-assist provisions, hundreds of volts have been specified for their designs. With the addition of electron cyclotron resonant heating (ECRH) assist, the design requirements have been lowered. To obtain information on the cost and complexity associated with this ECRH-assisted, OH-pulsed startup voltage for ignition-type machines, a trade-off study was completed. The Fusion Engineering Device (FED) configuration was selected as a model because information was available on the structure. The data obtained are applicable to all tokamaks of this general size and complexity, such as the Engineering Test Reactor

  4. Wind energy in the State of California: 10 years after program start-up

    International Nuclear Information System (INIS)

    Ferrari, G.; Tampone, O.; ENEA, Rome

    1992-01-01

    This article traces the evolution of the commercialization of wind energy power plants in the State of California. The brief historical review focuses on the activities during the early 80's which witnessed a rapid increase in the number of installed wind power units, especially large sized wind turbines, followed by a sharp decline due to cut-backs in State sponsored financial incentives for wind power development, as well as, to the onset of equipment maintenance and reliability problems. Statistical data - production by major wind farms, efficiency of selected types of medium-sized turbines, turbine efficiency by manufacturer and operator, wind power production cost trends, and federal funding of R ampersand D programs, are used to describe the wind energy situation in this State, currently host to 80% of the world's total of installed wind power plants. Indications are given as to the key socio-economic factors influencing the further development of this renewable energy source in California and, based on the California experience, assessments are made of the future marketing prospects of wind energy in other American states

  5. Construction and start-up tests for Unit No. 5 of Fukushima Daiichi Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, T; Sunami, Y; Ishii, N; Yokojima, T [Toshiba Corp., Kawasaki, Kanagawa (Japan)

    1978-12-01

    This unit, with an output capacity of 874 MWe, was completed by Toshiba last April on the basis of the actual operation records of the units previously completed and the experience in construction. Since its completion it has continued very excellent operation, with no emergency stop. This article is a description of the Unit 5, about: (1) the design and major points of improvement; (2) the construction work and cleaning of the plant; and (3) the operation tests, the use of the first automatic fuel exchanger, and the plant management system including the rust-preventive measures for two years since the oil-crisis.

  6. Software for physical start-up console

    International Nuclear Information System (INIS)

    Arbet, L.; Suchy, R.

    1991-01-01

    The physical start-up console comprises an PC AT-based control unit equipped with an 80386 processor, and information input/output units. The basic functions to be fulfilled by the control unit software include data acquisition related to the following parameters: neutron physics properties of the reactor core (neutron fluxes recorded by ionization chambers and reactivity recorded by a digital reactimeter), positions of the reactor core control elements (by the digital position meter) and reactor core control measurements, and technological quantities requisite for evaluating physical start-up tests. The measured and calculated data are shown on the control unit display. The setup of the data acquisition system and of user programs is dealt with, and characteristics of the user processes are briefly described. (Z.S.)

  7. Lessons learnt during the design, construction and start-up phase of a molten salt testing facility

    International Nuclear Information System (INIS)

    Rodríguez-García, Margarita-Manuela; Herrador-Moreno, Miguel; Zarza Moya, Eduardo

    2014-01-01

    In 2010, CIEMAT (Centro de investigaciones energéticas medioambientales y tecnológicas) signed a turn-key contract to have an experimental plant for thermal storage using molten salts at its PSA (Plataforma Solar de Almeria) facilities. This plant was designed to evaluate components, instrumentation and operation strategies and to give support to the industry in the qualification and evaluation of components. During the design, construction and start-up phases of this plant, many different aspects regarding design, construction and commissioning have been learnt and these will contribute to the improvement of other plants. Among other tips explained in the paper, we recommend the use of venting valves to eliminate the water present in the system after the pressure test or released by the salts during the first melting. The selection of instrumentation with no electronic components near a heat source, thus preventing them from overheating, is also advisable. The heat exchanger design and dimensioning should take into account not only the thermal losses to the atmosphere and through pipes and supports, but any possible reduction in the heat exchange surface that could have detrimental consequences in the thermal performance. Special attention must be paid when dimensioning and installing the EHT and insulation because both components are decisive in the avoidance of plug formation. Its correct installation in valves and supports and the proper positioning of the temperature control sensors, i.e. where no other heat source can distort the readings, are crucial. Recommendations and strategies for the operation and shutdown of this experimental plant are being gathered for a future paper. -- Highlights: • Description of the experimental molten salt storage system built at CIEMAT. • Design technical considerations for an experimental molten salt storage plant. • Hints for piping and heat exchangers design and thermal losses calculation. • Recommendations for

  8. Development and testing of computer aided start-up procedures for U-235 enrichment separation nozzle cascades

    International Nuclear Information System (INIS)

    Hein, H.; Schuette, R.; Steinhaus, H.

    1978-09-01

    In industrial scale separation nozzle cascades measured data acquisition and process control will be performed by on-line computer systems. To develop the necessary measurement and monitoring techniques, on-line control of the ten stage pilot plant by the WANG 2200 miniature computer system was tested. On-line data processing at the same time has reduced the number of measurements because a large number of operating data which cannot be measured directly can be obtained from a reduced number of measurements by calculation from the material balances in the gas dynamics network of the enrichment cascade. This is performed on-line by means of a cascade monitoring code which produces diagrams of the deviations of major operating parameters from their set values and thus offers to cascade operators an improved picture of the present status of a cascade, thereby facilitating the detection of causes of defects. The graphic representation chosen for this purpose and the performance of the system in practical operation is explained by an example of cascade adjustment and by a few selected examples of cascade fault conditions. Calculation of the quantities derived at all stages from the pressure (po) and concentration (No) readings requires that the individual flow characteristics of the separation nozzles are known. Alos the compressor characteristics have to be determined. Since the monitoring computer in calculating the cascade status utilizes these component characteristics in current enrichment operation, routinely establishing and plotting these two characteristics is also attributed to the computer system (start-up procedures). (orig.) 891 HP [de

  9. Ion cyclotron resonance heating (ICRH) start-up antenna for the mirror fusion test facility (MFTF-B)

    International Nuclear Information System (INIS)

    McCarville, T.M.; Romesser, T.E.

    1985-01-01

    The purpose of the ICRH start-up antenna on MFTF-B is to heat the plasma and control the ion distribution as the density increases during start-up. The antenna, consisting of two center fed half turn loops phased 180 0 apart, has been designed for 1 MW of input power, with a goal of coupling 400 kW into the ions. To vary the heating frequency relative to the local ion cyclotron frequency, the antenna is tunable over a range from 7.5 to 12.5 MHz. The thermal requirements common to low duty cycle ICRH antennas are especially severe for the MFTF-B antenna. The stress requirements are also unique, deriving from the possibility of seismic activity or JxB forces if the magnets unexpectedly quench. Considerable attention has been paid to contact control at high current bolt-up joints, and arranging geometries so as to minimize the possibility of voltage breakdown

  10. ORNL TNS program: microwave start-up of tokamak plasmas near electron cyclotron and upper hybrid resonances

    International Nuclear Information System (INIS)

    Peng, Y.K.M.; Borowski, S.K.

    1977-12-01

    The scenario of toroidal plasma start-up with microwave initiation and heating near the electron cyclotron frequency is suggested and examined here. We assume microwave irradiation from the high field side and an anomalously large absorption of the extraordinary waves near the upper hybrid resonance. The dominant electron energy losses are assumed to be due to magnetic field curvature and parallel drifts, ionization of neutrals, cooling by ions, and radiation by low Z impurities. It is shown by particle and energy balance considerations that electron temperatures around 250 eV and densities of 10 12 to 10 13 cm -3 can be maintained, at least in a narrow region near the upper hybrid resonance, with modest microwave powers in the Impurity Study Experiment (ISX) (120 kW at 28 GHz) and The Next Step (TNS) (0.57 MW at 120 GHz). The loop voltages required for start-up from these initial plasmas are also estimated. It is shown that the loop voltage can be reduced by a factor of five to ten from that for unassisted start-up without an increase in the resistive loss in volt-seconds. If this reduction in loop voltage is verified in the ISX experiments, substantial savings in the cost of power supplies for the ohmic heating (OH) and equilibrium field (EF) coils can be realized in future large tokamaks

  11. Underground Nuclear Testing Program, Nevada Test Site

    International Nuclear Information System (INIS)

    1975-09-01

    The Energy Research and Development Administration (ERDA) continues to conduct an underground nuclear testing program which includes tests for nuclear weapons development and other tests for development of nuclear explosives and methods for their application for peaceful uses. ERDA also continues to provide nuclear explosive and test site support for nuclear effects tests sponsored by the Department of Defense. This Supplement extends the Environmental Statement (WASH-1526) to cover all underground nuclear tests and preparations for tests of one megaton (1 MT) or less at the Nevada Test Site (NTS) during Fiscal Year 1976. The test activities covered include numerous continuing programs, both nuclear and non-nuclear, which can best be conducted in a remote area. However, if nuclear excavation tests or tests of yields above 1 MT or tests away from NTS should be planned, these will be covered by separate environmental statements

  12. LHC Startup

    CERN Document Server

    AUTHOR|(CDS)2067853

    2008-01-01

    The Large Hadron Collider will commence operations in the latter half of 2008. The plans of the LHC experiments ALICE, ATLAS, CMS and LHCb are described. The scenario for progression of luminosity and the strategies of these 4 experiments to use the initial data are detailed. There are significant measurements possible with integrated luminosities of 1, 10 and 100 pb^-1. These measurements will provide essential calibration and tests of the detectors, understanding of the Standard Model backgrounds and a first oportunity to look for new physics.

  13. Start-up of Rapsodie

    International Nuclear Information System (INIS)

    Pontier, R.

    1967-01-01

    After giving a general description of Rapsodie this report presents the conditions in which the start-up occurred and in which the tests were carried out. A chronological account is given of the operations and of the main events which occurred. The modifications made to the reactor during this period are described and a synthesis of the results obtained is presented. (author) [fr

  14. Experience in the Kola NPP start-up works

    International Nuclear Information System (INIS)

    Zakharov, S.I.; Omel'chuk, V.V.; Bodrukhin, Yu.M.

    1984-01-01

    Main stages and peculiar features of maintenance and start-up works at WWER-440 type reactor NPPs described. Remarks revealed during complex equipment testing, physical and power start-up will be useful for arrangement of maintenance and start-up works at newly built NPPs

  15. The physics of tokamak start-up

    International Nuclear Information System (INIS)

    Mueller, D.

    2013-01-01

    Tokamak start-up on present-day devices usually relies on inductively induced voltage from a central solenoid. In some cases, inductive startup is assisted with auxiliary power from electron cyclotron radio frequency heating. International Thermonuclear Experimental Reactor, the National Spherical Torus Experiment Upgrade and JT60, now under construction, will make use of the understanding gained from present-day devices to ensure successful start-up. Design of a spherical tokamak (ST) with DT capability for nuclear component testing would require an alternative to a central solenoid because the small central column in an ST has insufficient space to provide shielding for the insulators in the solenoid. Alternative start-up techniques such as induction using outer poloidal field coils, electron Bernstein wave start-up, coaxial helicity injection, and point source helicity injection have been used with success, but require demonstration of scaling to higher plasma current

  16. Implementation of nuclear power plant simulation in start-up commissioning of reactor control system

    International Nuclear Information System (INIS)

    Yang Zongwei; Huang Tieming; Feng Guangyu; Luan Zhenhua; Lin Meng; Zhu Lizhi

    2009-01-01

    Based on the nuclear power thermal-hydraulic model, Labview graphical programming language and virtual instrument data acquisition technology, this paper describes a dedicate test platform to solve the problem that the reactor control system (RRC) can not be evaluated and analyzed far before the actual startup of the unit. By connecting the test platform to the nuclear Digital Control System (DCS), the step-by-step closed-looped test and global function test of RRC system were performed, the dynamic validation and logical function demonstration for RRC were realized, and a lot of configuration mistakes of RRC and nonconformity were solved. The test for unit 3 of Ling'ao phase II has proved that the implementation of nuclear power plant simulation in the start-up commissioning of RRC can greatly reduce the risk of normal power operation and great transient tests, with which the term of startup for overall unit test can be greatly shortened. (authors)

  17. Estudio de las Startups

    OpenAIRE

    Rodríguez Reina, Cristina

    2016-01-01

    Este trabajo trata de analizar las pautas a la hora de poner en marcha una startup. Se explica el método que hay que seguir (Lean Startup), se expone una breve biografía de su autor, se muestran las distintas fases por las que atraviesa, las formas de financiación, así como una serie de puntos que servirán de ayuda para adentrarse en este mundo tan novedoso y hasta entonces tan poco conocido, como es el de la startups. Dentro del ámbito de las startups, se explicará el tema ...

  18. Accelerated test program

    Science.gov (United States)

    Ford, F. E.; Harkness, J. M.

    1977-01-01

    A brief discussion on the accelerated testing of batteries is given. The statistical analysis and the various aspects of the modeling that was done and the results attained from the model are also briefly discussed.

  19. Loop Heat Pipe Startup Behaviors

    Science.gov (United States)

    Ku, Jentung

    2016-01-01

    A loop heat pipe must start successfully before it can commence its service. The startup transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe startup behaviors. Topics include the four startup scenarios, the initial fluid distribution between the evaporator and reservoir that determines the startup scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power startup, and methods to enhance the startup success. Also addressed are the pressure spike and pressure surge during the startup transient, and repeated cycles of loop startup and shutdown under certain conditions.

  20. Test Program Set (TPS) Lab

    Data.gov (United States)

    Federal Laboratory Consortium — The ARDEC TPS Laboratory provides an organic Test Program Set (TPS) development, maintenance, and life cycle management capability for DoD LCMC materiel developers....

  1. Assessment of Startup Fuel Options for the GNEP Advanced Burner Reactor (ABR)

    Energy Technology Data Exchange (ETDEWEB)

    Jon Carmack (062056); Kemal O. Pasamehmetoglu (103171); David Alberstein

    2008-02-01

    The Global Nuclear Energy Program (GNEP) includes a program element for the development and construction of an advanced sodium cooled fast reactor to demonstrate the burning (transmutation) of significant quantities of minor actinides obtained from a separations process and fabricated into a transuranic bearing fuel assembly. To demonstrate and qualify transuranic (TRU) fuel in a fast reactor, an Advanced Burner Reactor (ABR) prototype is needed. The ABR would necessarily be started up using conventional metal alloy or oxide (U or U, Pu) fuel. Startup fuel is needed for the ABR for the first 2 to 4 core loads of fuel in the ABR. Following start up, a series of advanced TRU bearing fuel assemblies will be irradiated in qualification lead test assemblies in the ABR. There are multiple options for this startup fuel. This report provides a description of the possible startup fuel options as well as possible fabrication alternatives available to the program in the current domestic and international facilities and infrastructure.

  2. Initial Startup and Testing of the Fort St. Vrain HTGR - Lessons Learned which May Be Useful to the HTR-PM

    International Nuclear Information System (INIS)

    Brey, Larry H.

    2014-01-01

    Lessons Learned: Although the HTR-PM and FSV incorporate significant differences in their designs, there are lessons to be learned that are applicable to both plants. This is especially important for key systems that incorporate first-of-a-kind equipment. Basically, these lessons are just an application of common sense. • Complexity Breeds Unavailability. Incorporate system/components that are ruggedly simple in design with a history of reliable operation and minimal maintenance. • Assure Strong Expertise and Funding for this First HTR-PM. Quite likely, the successful startup and operation of this plant will require a level of support considerably greater than a typical nuclear plant. • Be Very Attentive to the Design Aspects of first-of-a-kind Components in the Class 1, Safety-Related Portions of the Plant. For example; a generic metallurgical failure could easily lead to a very long plant shutdown in order to redesign the failed component, re-license, manufacture, install and test prior to plant resuming plant operation. • Where Possible, Test all Key Systems/Components Prior to Installation using Actual Plant Configuration & Operating Characteristics This will help assure operational capability prior to application of nuclear heat. • Never Attempt to Start an Innovative Nuclear Power Plant Without First Having the Proper Regulatory Guides and Criteria in Place. FSV was licensed as a Research Facility. There was no Standard Review Plan or Regulatory Guides in place for the NRC (or PSC) to utilize in regulating this HTGR. • Do Not Be Reluctant to Incorporate a Generous Over-Build Capability into Systems/Components. It is significantly easier to design extra margin into the original compressors, pumps and motors than to be required to backfit into larger units after plant start-up. • Assure All Safety Documents Reflect the Actual Capability of the Plant to Respond to Accidents Described in the Safety Analysis. FSV was limited to 82% power during the

  3. Accelerated leach test development program

    International Nuclear Information System (INIS)

    Fuhrmann, M.; Pietrzak, R.F.; Heiser, J.; Franz, E.M.; Colombo, P.

    1990-11-01

    In FY 1989, a draft accelerated leach test for solidified waste was written. Combined test conditions that accelerate leaching were validated through experimental and modeling efforts. A computer program was developed that calculates test results and models leaching mechanisms. This program allows the user to determine if diffusion controls leaching and, if this is the case, to make projections of releases. Leaching mechanisms other than diffusion (diffusion plus source term partitioning and solubility limited leaching) are included in the program is indicators of other processes that may control leaching. Leach test data are presented and modeling results are discussed for laboratory scale waste forms composed of portland cement containing sodium sulfate salt, portland cement containing incinerator ash, and vinyl ester-styrene containing sodium sulfate. 16 refs., 38 figs., 5 tabs

  4. Replacement of Cross-Site Transfer System Startup Plan

    International Nuclear Information System (INIS)

    Gerken, M.D.

    1996-01-01

    This Startup Plan provides a discussion of organizational responsibilities, work planning, quality assurance (QA), personnel qualifications, and testing requirements for the Cross-Site Transfer System

  5. USA/FBR program fast flux test facility startup physics and reactor characterization methods and results

    International Nuclear Information System (INIS)

    Bennett, R.A.; Harris, R.A.; Daughtry, J.W.

    1981-09-01

    Final confirmation of much of the engineering mockup work has been achieved in FTR zero-power experiments in February, 1980, and in power demonstration performed in December, 1980, and March, 1981. Final in-core low-power and high-power irradiation of spatially distributed radioactivants will be completed late in 1981. This paper describes physics experiments and present summaries of the extensive results accumulated to date. 53 figures

  6. Balance of the first 1300MW units start-up phase

    International Nuclear Information System (INIS)

    Meclot, M.; Lemagny, M.; Lavogiez, M.

    1985-01-01

    The program of tests is briefly recalled. Then, a balance of the incident cards is presented. After a recall of the lessons to be drawn from the start-up phase, a comparative examination of the 1300 and 900 unit availability is presented for the first operating year [fr

  7. Intentions to Apply as Internship Students on Digital Start-Up Companies in Jakarta

    Directory of Open Access Journals (Sweden)

    Liza Agustina Maureen Nelloh

    2017-11-01

    Full Text Available Human capital plays an important role in explaining organizational performance and survival, not only for well-established firms but also for digital startup companies. However no previous human resource literature, especially on employers’ brand, investigates the internship program in the startup digital firms. Our pre-test shows that students are less attracted to apply to startup digital companies. Consequently, this study aims to test students’ intention to be on an internship in startup digital companies with its several antecedents (organizational attractiveness, job meaning, organizational attributes, and institutional image. My purposive sampling generates 101 business and management students in Jakarta as my sample. I run Partial Least Square (PLS to test my hypothesis. The results indicate that organizational attributes do not affect intention to be on an internship and other hypothesis tests exhibit positive results. Further, the findings also show that organizational attributes do not exhibit mediating effect. Overall, the results suggest that digital startup companies cooperate and collaborate with universities, especially business and management departments in research and student projects in order to attract the best students to be on internship on these companies that eventually will improve their performance. Abstrak Sumber Daya Manusia memegang peran penting dalam ketahanan dan peningkatan kinerja perusahaan baik berskala besar ataupun berskala startup digital. Akan tetapi, penelitian sebelumnya mengenai sumber daya manusia khususnya merek perekrut yang menguji secara khusus pada program magang yang banyak dilakukan oleh jurusan bisnis dan manajemen atau sejenisnya masih jarang dilakukan. Kemudian, hasil prates menunjukkan rendahnya ketertarikan dan keinginan mahasiswa untuk melamar di perusahaan startup digital. Oleh karena itu, penelitian ini bertujuan untuk menguji intensi melamar calon mahasiswa magang di perusahaan

  8. Single event upset test programs

    International Nuclear Information System (INIS)

    Russen, L.C.

    1984-11-01

    It has been shown that the heavy ions in cosmic rays can give rise to single event upsets in VLSI random access memory devices (RAMs). Details are given of the programs written to test 1K, 4K, 16K and 64K memories during their irradiation with heavy charged ions, in order to simulate the effects of cosmic rays in space. The test equipment, which is used to load the memory device to be tested with a known bit pattern, and subsequently interrogate it for upsets, or ''flips'', is fully described. (author)

  9. Program proposed for dosimetric measures to be carried out during the start-up of the Juragua Nuclear Power Plant

    International Nuclear Information System (INIS)

    Romero Cabrera, J.L.

    1996-01-01

    The present measurement program fulfills two main tasks the first aimed at showing the staff permissible magnitudes of radiation doses and the second to the control of radiation protection and the gathering of necessary data for optimum radiation protection measures

  10. Status of CCTF test program

    International Nuclear Information System (INIS)

    Murao, Y.; Iguchi, T.; Sugimoto, J.; Akimoto, H.; Okubo, T.; Okabe, K.

    1984-01-01

    The cylindrical core test facility (CCTF) is one of the facilities of the large scale reflood test program which was initiated in April, 1976. The first series of the CCTF test (CCTF CORE I Test) was completed in April, 1981 and the second series (CCTF Core II Test) has been conducted since April, 1982. In the test, the following has been intended to be examined: (1) The conservativeness of the assumption of the safety analysis with the evaluation model (EM) code. (2) The refill and reflood phenomena for analytical modeling of thermo-hydrodynamics in the core and the system. (3) The validity of the models in the EM code and the application to the best estimate code development. In this paper, presented are the quantative evaluation of the REFLA code and the discussion of some CCTF Core II Test results. The REFLA code consists of REFLA-1D core code developed with the results of small scale tests and a simple system model developed with the results of the CCTF Core I Test. The CCTF Core II Test was perfored for developing more realistic model for the alternative ECCS as well as for the cold leg injection type ECCS

  11. Automated [inservice testing] IST program

    International Nuclear Information System (INIS)

    Wright, W.M.

    1990-01-01

    There are two methods used to manage a Section XI program: Manual and Automated. The manual method usually consists of hand written records of test results and scheduling requirements. This method while initially lower in cost, results in problems later on in the life of a plant as data continues to accumulate. Automation allows instant access to forty years of test results. Due to the lower cost and higher performance of todays' personal computers, an automated method via a computer program provides an excellent method for managing the vast amount of data that accumulates over the forty year life of a plant. Through the use of a computer, special functions involving this data are available, which through a manual method would not be practical. This paper will describe some of the advantages in using a computer program to manage the Section XI 1ST program. The ISTBASE consists of program code and numerous databases. The source code is written and complied in CLIPPER (tm) language. Graphing routines are performed by dGE (tm) graphics library. Graphs are displayed in EGA form. Since it was estimated that the total complied code, would exceed 640K of ram, overlays through the use of modular programming were used to facilitate the DOS restrictions of 640K ram. The use of overlays still require the user to gain access to ISTBASE through the PASSWORD module. The database files are designed to be compatible with dBASE III+ (tm) data structure. This allows transfer of data between ISTBASE and other database managers/applications. A math co-processor is utilized to speed up calculations on graphs and other mathematical calculations. Program code and data files require a hard disk drive with at least 28 Meg capacity. While ISTBASE will execute on a 8088 based computer, an 80286 computer with a 12 MHz operating speed should be considered the minimum system configuration

  12. Minimum Leakage Condenser Test Program

    International Nuclear Information System (INIS)

    1978-05-01

    This report presents the results and analysis of tests performed on four critical areas of large surface condensers: the tubes, tubesheets, tube/tubesheet joints and the water chambers. Significant changes in operation, service duty and the reliability considerations require that certain existing design criteria be verified and that improved design features be developed. The four critical areas were treated analytically and experimentally. The ANSYS finite element computer program was the basic analytical method and strain gages were used for obtaining experimental data. The results of test and analytical data are compared and recommendations made regarding potential improvement in condenser design features and analytical techniques

  13. Editorial: Startups (February 2010

    Directory of Open Access Journals (Sweden)

    Dru Lavigne

    2010-01-01

    Full Text Available Bob Sutor, Vice President of the Open Source and Linux division at IBM, recently stated that "there doesn't seem to be very many good guides about the nuts and bolts of starting an open source business". He speculates that one reason is that "there is no one way to start and run a business that involves open source". The authors in this issue of the OSBR are serial entrepreneurs, startup founders, and professionals who provide services to and interact daily with startups.

  14. On Startups and Doublethink

    DEFF Research Database (Denmark)

    Egan-Wyer, Carys; Muhr, Sara L.; Rehn, Alf

    2018-01-01

    a reaction to a perceived outrage or a power imbalance, but isin itselfa constitutive part of contemporary entrepreneurship,particularly as this is culturally constructed. We study this paradox, where a discourse of resistance becomes a productive part of entrepreneurial culture, by way of a case study...... of a successful startup. We analyze the manner in which people working in the startup utilize ‘doublethink’ to portray the organization both as resistance to an assumed, more corporate, ‘Other’ and also as a budding corporation unto itself. By doing so, we highlight how a discourse of resistance works as a value...

  15. Software Startups - A Research Agenda

    Directory of Open Access Journals (Sweden)

    Michael Unterkalmsteiner

    2016-10-01

    Full Text Available Software startup companies develop innovative, software-intensive products within limited time frames and with few resources, searching for sustainable and scalable business models. Software startups are quite distinct from traditional mature software companies, but also from micro-, small-, and medium-sized enterprises, introducing new challenges relevant for software engineering research. This paper's research agenda focuses on software engineering in startups, identifying, in particular, 70+ research questions in the areas of supporting startup engineering activities, startup evolution models and patterns, ecosystems and innovation hubs, human aspects in software startups, applying startup concepts in non-startup environments, and methodologies and theories for startup research. We connect and motivate this research agenda with past studies in software startup research, while pointing out possible future directions. While all authors of this research agenda have their main background in Software Engineering or Computer Science, their interest in software startups broadens the perspective to the challenges, but also to the opportunities that emerge from multi-disciplinary research. Our audience is therefore primarily software engineering researchers, even though we aim at stimulating collaborations and research that crosses disciplinary boundaries. We believe that with this research agenda we cover a wide spectrum of the software startup industry current needs.

  16. DISP: Optimizations towards Scalable MPI Startup

    Energy Technology Data Exchange (ETDEWEB)

    Fu, Huansong [Florida State University, Tallahassee; Pophale, Swaroop S [ORNL; Gorentla Venkata, Manjunath [ORNL; Yu, Weikuan [Florida State University, Tallahassee

    2016-01-01

    Despite the popularity of MPI for high performance computing, the startup of MPI programs faces a scalability challenge as both the execution time and memory consumption increase drastically at scale. We have examined this problem using the collective modules of Cheetah and Tuned in Open MPI as representative implementations. Previous improvements for collectives have focused on algorithmic advances and hardware off-load. In this paper, we examine the startup cost of the collective module within a communicator and explore various techniques to improve its efficiency and scalability. Accordingly, we have developed a new scalable startup scheme with three internal techniques, namely Delayed Initialization, Module Sharing and Prediction-based Topology Setup (DISP). Our DISP scheme greatly benefits the collective initialization of the Cheetah module. At the same time, it helps boost the performance of non-collective initialization in the Tuned module. We evaluate the performance of our implementation on Titan supercomputer at ORNL with up to 4096 processes. The results show that our delayed initialization can speed up the startup of Tuned and Cheetah by an average of 32.0% and 29.2%, respectively, our module sharing can reduce the memory consumption of Tuned and Cheetah by up to 24.1% and 83.5%, respectively, and our prediction-based topology setup can speed up the startup of Cheetah by up to 80%.

  17. Startup development: strategic point of view

    OpenAIRE

    ZOPUNYAN Y.S.

    2015-01-01

    The article analyses different strategies of the startup development. The author considers such phases of the startup development as pre-startup, launch, post-startup. The author analyzes factors that affect startup development. The paper presents conclusions about key elements of startup's strategic development.

  18. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  19. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...

  20. Technical bases for the DWPF testing program

    International Nuclear Information System (INIS)

    Plodinec, M.J.

    1990-01-01

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) will be the first production facility in the United States for the immobilization of high-level nuclear waste. Production of DWPF canistered wasteforms will begin prior to repository licensing, so decisions on facility startup will have to be made before the final decisions on repository design are made. The Department of Energy's Office of Civilian Radioactive Waste Management (RW) has addressed this discrepancy by defining a Waste Acceptance Process. This process provides assurance that the borosilicate-glass wasteform, in a stainless-steel canister, produced by the DWPF will be acceptable for permanent storage in a federal repository. As part of this process, detailed technical specifications have been developed for the DWPF product. SRS has developed detailed strategies for demonstrating compliance with each of the Waste Acceptance Process specifications. An important part of the compliance is the testing which will be carried out in the DWPF. In this paper, the bases for each of the tests to be performed in the DWPF to establish compliance with the specifications are described, and the tests are detailed. The results of initial tests relating to characterization of sealed canisters are reported

  1. Restart Testing Program for piping following steam generator replacement at North Anna Unit 1

    International Nuclear Information System (INIS)

    Bain, R.A.; Bayer, R.K.

    1993-01-01

    In order to provide assurance that the effects of performing steam generator replacement (SGR) at North Anna unit 1 had no adverse impact on plant piping systems, a cold functional verification restart testing program was developed. This restart testing program was implemented in lieu of a hot functional testing program normally used during the initial startup of a nuclear plant. A review of North Anna plant-specific and generic U.S. Nuclear Regulatory Commission requirements for restart testing was performed to ensure that no mandatory hot functional testing was required. This was determined to be the case, and the development of a cold functional test program was initiated. The cold functional test had inherent advantages as compared to the hot functional testing, while still providing assurance of piping system adequacy. The advantages of the cold verification program included reducing risk to personnel from hot piping, increasing the accuracy of measurements with the improvement in work conditions, eliminating engineering activities during the heatup process, and being able to record measurements as construction work was completed allowing for rework or repair of components if required. To ensure the effectiveness of the cold verification program, a project procedure was generated to identify the personnel, equipment, and measurement requirements. An engineering calculation was issued to document the scope of the restart test program, and an additional calculation was developed to provide acceptance criteria for the critical commodity measurements

  2. Safety related experience in FFTF startup and operation

    International Nuclear Information System (INIS)

    Peterson, R.E.; Halverson, T.G.; Daughtry, J.W.

    1982-06-01

    The Fast Flux Test Facility (FFTF) is a 400 MW(t) sodium cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US LMFBR program. Startup and initial power ascension testing of the facility involved a comprehensive series of readiness reviews and acceptance tests, many of which relate to the inherent safety of the plant. Included are physics measurements, natural circulation, integrated containment leakage, shielding effectiveness, fuel failure detection, and plant protection system tests. Described are the measurements taken to confirm the design safety margins upon which the operating authorization of the plant was based. These measurements demonstrate that large margins of safety are available in the FFTF design

  3. An innovative approach for testing bioinformatics programs using metamorphic testing

    Directory of Open Access Journals (Sweden)

    Liu Huai

    2009-01-01

    Full Text Available Abstract Background Recent advances in experimental and computational technologies have fueled the development of many sophisticated bioinformatics programs. The correctness of such programs is crucial as incorrectly computed results may lead to wrong biological conclusion or misguide downstream experimentation. Common software testing procedures involve executing the target program with a set of test inputs and then verifying the correctness of the test outputs. However, due to the complexity of many bioinformatics programs, it is often difficult to verify the correctness of the test outputs. Therefore our ability to perform systematic software testing is greatly hindered. Results We propose to use a novel software testing technique, metamorphic testing (MT, to test a range of bioinformatics programs. Instead of requiring a mechanism to verify whether an individual test output is correct, the MT technique verifies whether a pair of test outputs conform to a set of domain specific properties, called metamorphic relations (MRs, thus greatly increases the number and variety of test cases that can be applied. To demonstrate how MT is used in practice, we applied MT to test two open-source bioinformatics programs, namely GNLab and SeqMap. In particular we show that MT is simple to implement, and is effective in detecting faults in a real-life program and some artificially fault-seeded programs. Further, we discuss how MT can be applied to test programs from various domains of bioinformatics. Conclusion This paper describes the application of a simple, effective and automated technique to systematically test a range of bioinformatics programs. We show how MT can be implemented in practice through two real-life case studies. Since many bioinformatics programs, particularly those for large scale simulation and data analysis, are hard to test systematically, their developers may benefit from using MT as part of the testing strategy. Therefore our work

  4. Start-up of NPP Krsko; Pokusno obratovanje NE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Spiler, J; Aralica, J [Nuklearna elektrana Krsko, Krsko (Yugoslavia)

    1984-07-01

    The report describes a review of start-up program and its realisation. There are also described some more significant start-up results with their evaluation. The most significant operation criteria are compared between NPP Krsko and other similar plants in the world. The comparison shows that after the first contractors and operation personnel efforts have been accomplished, our first nuclear power plant is a safe and reliable source of electric power. At the end there are listed NPP Krsko start-up recommendations and experience. (author)

  5. Factors influencing performance within startup assistance organizations

    Directory of Open Access Journals (Sweden)

    Ceaușu Ioana

    2017-07-01

    Full Text Available Startup assistance organizations, and especially business accelerators have gained a lot of traction in the last years, captioning not only the attention of the public, but most importantly that of investors and other stakeholders. It has become a challenge for many all around the world to develop such programs, but many have failed or did not have their expected results, meaning medium to long-term sustainable and profitable alumni start-ups. As high amounts of resources, both human and financial, are being invested in the design and development of such programs, it is important to understand what sets apart the successful business acceleration programs from the ones that fail. The current paper is reviewing the up-to-date theoretical literature and studies on the matter at hand, in order to identify the most relevant factors influencing startup assistance organizations’ performance. The objective behind identifying these factors is to get a better understanding of best practices of such successful programs and set the basis for future research regarding the development of a set of metrics for more accurately measuring their performance.

  6. SP-100 initial startup and restart control strategy

    Science.gov (United States)

    Halfen, Frank J.; Wong, Kwok K.; Switick, Dennis M.; Shukla, Jaikaran N.

    Startup control strategies for SP-100 are described. Revised control and operating strategies are discussed which have been developed and tested using the SP-100 dynamic simulation model Aries-GFS (Generic Flight System).

  7. 47 CFR 73.713 - Program tests.

    Science.gov (United States)

    2010-10-01

    ... International Broadcast Stations § 73.713 Program tests. (a) Upon completion of construction of an international.... The Commission reserves the right to change the date of the beginning of such tests or to suspend or revoke the authority for program tests as and when such action may appear to be in the public interest...

  8. Portland General Electric Company report on the operating and startup experience with control and instrumentation and electrical systems at the Trojan Nuclear Plant

    International Nuclear Information System (INIS)

    Zimmerman, G.A.

    1977-01-01

    The Trojan Nuclear Plant is an 1178 MWe nuclear plant located on the Columbia River 40 miles northwest of Portland, Oregon. The Nuclear Stream Supply System vendor is Westinghouse with a General Electric turbine generator. The reactor is rated and licensed for 3423 MWt (1178 MWe) and the turbine generator is designed for 3570 MWt(1219 MWe). The startup phase testing of Trojan commenced on November 21, 1975, upon receipt of our NRC Operating License. The startup testing program was completed on May 22, 1976, following 100 hours of full-power operation, at which time a scheduled summer maintenance outage began. Some of the highlights and milestones of the startup testing program are described

  9. Energy losses on tokamak startup

    International Nuclear Information System (INIS)

    Murray, J.G.; Rothe, K.E.; Bronner, G.

    1983-01-01

    During the startup of a tokamak reactor using poloidal field (PF) coils to induce plasma currents, the conducting structures carry induced currents. The associated energy losses in the circuits must be provided by the startup coils and the PF system. This paper provides quantitative and comparitive values for the energies required as a function of the thickness or resistivity of the torus shells

  10. An eigenexpansion technique for modelling plasma start-up

    International Nuclear Information System (INIS)

    Pillsbury, R.D.

    1989-01-01

    An algorithm has been developed and implemented in a computer program that allows the estimation of PF coil voltages required to start-up an axisymmetric plasma in a tokamak in the presence of eddy currents in toroidally continuous conducting structures. The algorithm makes use of an eigen-expansion technique to solve the lumped parameter circuit loop voltage equations associated with the PF coils and passive (conducting) structures. An example of start-up for CIT (Compact Ignition Tokamak) is included

  11. The PUMA test program and data analysis

    International Nuclear Information System (INIS)

    Han, J.T.; Morrison, D.L.

    1997-01-01

    The PUMA test program is sponsored by the U.S. Nuclear Regulatory Commission to provide data that are relevant to various Boiling Water Reactor phenomena. The author briefly describes the PUMA test program and facility, presents the objective of the program, provides data analysis for a large-break loss-of-coolant accident test, and compares the data with a RELAP5/MOD 3.1.2 calculation

  12. Activity Based Startup Plan for Prototype Vertical Denitration Calciner

    International Nuclear Information System (INIS)

    SUTTER, C.S.

    1999-01-01

    Testing activation on the Prototype Vertical Denitration Calciner at PFP were suspended in January 1997 due to the hold on fissile material handling in the facility. The restart of testing activities will require a review through an activity based startup process based upon Integrated Safety Management (ISM) principles to verify readiness. The Activity Based Startup Plan for the Prototype vertical Denitration Calciner has been developed for this process

  13. Accelerated bridge paint test program.

    Science.gov (United States)

    2011-07-06

    The accelerated bridge paint (AB-Paint) program evaluated a new Sherwin-Williams two-coat, : fast-curing paint system. The system is comprised of an organic zinc-rich primer (SW Corothane I : Galvapac One-Pack Zinc-Rich Primer B65 G11) and a polyurea...

  14. Impact of entrepreneurship policies on opportunity to startup

    Directory of Open Access Journals (Sweden)

    Ali Davari

    2017-09-01

    Full Text Available During the previous decades, policy makers have formulated policies for developing entrepreneurship in different countries in order to decrease unemployment and poverty toward sustainable development. Some of these policies include encouraging people to be an entrepreneur, opportunity creation, educating new skills to entrepreneurs and so on. In recent years an appropriate context has been formed for entrepreneurship development in Iran and some programs have been executed. Therefore, formulating appropriate frameworks to guide Iranian government in this way is a necessity. This paper evaluates the impact of entrepreneurship policies on opportunity to startup in Iran. The results of path analysis indicate that supportive financial and non-financial actions influence positively on opportunity to startup. In addition, education and culture also influence positively on opportunity to startup. Finally, legislation also positively influences on opportunity to startup.

  15. Defense waste processing facility startup progress report

    International Nuclear Information System (INIS)

    Iverson, D.C.; Elder, H.H.

    1992-01-01

    The Savannah River Site (SRS) has been operating a nuclear fuel cycle since the 1950's to produce nuclear materials in support of the national defense effort. About 83 million gallons of high level waste produced since operation began have been consolidated into 33 million gallons by evaporation at the waste tank farm. The Department of Energy has authorized the construction of the Defense Waste Processing Facility (DWPF) to immobilize the waste as a durable borosilicate glass contained in stainless steel canisters, prior to emplacement in a federal repository. The DWPF is now mechanically complete and undergoing commissioning and run-in activities. Cold startup testing using simulated non-radioactive feeds is scheduled to begin in November 1992 with radioactive operation scheduled to begin in May 1994. While technical issues have been identified which can potentially affect DWPF operation, they are not expected to negatively impact the start of non-radioactive startup testing

  16. The Yucca Mountain Project Prototype Testing Program

    International Nuclear Information System (INIS)

    1989-10-01

    The Yucca Mountain Project is conducting a Prototype Testing Program to ensure that the Exploratory Shaft Facility (ESF) tests can be completed in the time available and to develop instruments, equipment, and procedures so the ESF tests can collect reliable and representative site characterization data. This report summarizes the prototype tests and their status and location and emphasizes prototype ESF and surface tests, which are required in the early stages of the ESF site characterization tests. 14 figs

  17. Testing programs for the Multimission Modular Spacecraft

    Science.gov (United States)

    Greenwell, T. J.

    1978-01-01

    The Multimission Modular Spacecraft (MMS) provides a standard spacecraft bus to a user for a variety of space missions ranging from near-earth to synchronous orbits. The present paper describes the philosophy behind the MMS module test program and discusses the implementation of the test program. It is concluded that the MMS module test program provides an effective and comprehensive customer buy-off at the subsystem contractor's plant, is an optimum approach for checkout of the subsystems prior to use for on-orbit servicing in the Shuttle Cargo Bay, and is a cost-effective technique for environmental testing.

  18. Implementing and testing program PLOTTAB

    International Nuclear Information System (INIS)

    Cullen, D.E.; McLaughlin, P.K.

    1988-01-01

    Enclosed is a description of the magnetic tape or floppy diskette containing the PLOTTAB code package. In addition detailed information is provided on implementation and testing of this code. See part I for mainframe computers; part II for personal computers. These codes are documented in IAEA-NDS-82. (author)

  19. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  20. Startup, Shutdown, & Malfunction (SSM) Emissions

    Science.gov (United States)

    EPA issued a final action to ensure states have plans in place that are fully consistent with the Clean Air Act and recent court decisions concerning startup, shutdown and malfunction (SSM) operations.

  1. MHD diffuser model test program

    Energy Technology Data Exchange (ETDEWEB)

    Idzorek, J J

    1976-07-01

    Experimental results of the aerodynamic performance of seven candidate diffusers are presented to assist in determining their suitability for joining an MHD channel to a steam generator at minimum spacing. The three dimensional diffusers varied in area ratio from 2 to 3.8 and wall half angle from 2 to 5 degrees. The program consisted of five phases: (1) tailoring a diffuser inlet nozzle to a 15 percent blockage; (2) comparison of isolated diffusers at enthalpy ratios 0.5 to 1.0 with respect to separation characteristics and pressure recovery coefficients; (3) recording the optimum diffuser exit flow distribution; (4) recording the internal flow distribution within the steam generator when attached to the diffuser; and (5) observing isolated diffuser exhaust dynamic characteristics. The 2 and 2-1/3 degree half angle rectangular diffusers showed recovery coefficients equal to 0.48 with no evidence of flow separation or instability. Diffusion at angles greater than these produced flow instabilities and with angles greater than 3 degrees random flow separation and reattachment.

  2. MHD diffuser model test program

    International Nuclear Information System (INIS)

    Idzorek, J.J.

    1976-07-01

    Experimental results of the aerodynamic performance of seven candidate diffusers are presented to assist in determining their suitability for joining an MHD channel to a steam generator at minimum spacing. The three dimensional diffusers varied in area ratio from 2 to 3.8 and wall half angle from 2 to 5 degrees. The program consisted of five phases: (1) tailoring a diffuser inlet nozzle to a 15 percent blockage; (2) comparison of isolated diffusers at enthalpy ratios 0.5 to 1.0 with respect to separation characteristics and pressure recovery coefficients; (3) recording the optimum diffuser exit flow distribution; (4) recording the internal flow distribution within the steam generator when attached to the diffuser; and (5) observing isolated diffuser exhaust dynamic characteristics. The 2 and 2-1/3 degree half angle rectangular diffusers showed recovery coefficients equal to 0.48 with no evidence of flow separation or instability. Diffusion at angles greater than these produced flow instabilities and with angles greater than 3 degrees random flow separation and reattachment

  3. Bumpy torus annulus startup

    International Nuclear Information System (INIS)

    Sperling, J.L.; Hamasaki, S.; Krall, N.A.

    1982-01-01

    In order that a stable bumpy torus plasma configuration can be attained, it is first necessary to irradiate the plasma with sufficient external power to cause annulus formation. To estimate the power required to initiate annuli, it is assumed that quasilinear electron-cyclotron heating by microwaves is the dominant electron heating mechanism. A scaling law for required microwave power is derived which shows that annulus formation is assisted by smaller cross-section areas, lower density, lower microwave frequency, and higher C-mode temperature. The scaling law is quantitatively evaluated for NBT, EBT-1, EBT-S, EBT-P, and EBT-R parameters. The resulting power estimates are consistent with the available microwave power in previous and present experiments. In larger projected bumpy tori, like EBT-P and EBT-R, it may be necessary to initiate annulus formation at densities which are lower than in the stable T-mode so that the necessary microwave power can be reduced to reasonably modest levels. It is suggested that instabilities as well as rf heating can aid the formation of bumpy torus electron annuli. Rf experiments on NBT and EBT-S would be beneficial in determining the capability of rf power to assist annulus startup

  4. In-situ thermal testing program strategy

    International Nuclear Information System (INIS)

    1995-06-01

    In the past year the Yucca Mountain Site Characterization Project has implemented a new Program Approach to the licensing process. The Program Approach suggests a step-wise approach to licensing in which the early phases will require less site information than previously planned and necessitate a lesser degree of confidence in the longer-term performance of the repository. Under the Program Approach, the thermal test program is divided into two principal phases: (1) short-term in situ tests (in the 1996 to 2000 time period) and laboratory thermal tests to obtain preclosure information, parameters, and data along with bounding information for postclosure performance; and (2) longer-term in situ tests to obtain additional data regarding postclosure performance. This effort necessitates a rethinking of the testing program because the amount of information needed for the initial licensing phase is less than previously planned. This document proposes a revised and consolidated in situ thermal test program (including supporting laboratory tests) that is structured to meet the needs of the Program Approach. A customer-supplier model is used to define the Project data needs. These data needs, along with other requirements, were then used to define a set of conceptual experiments that will provide the required data within the constraints of the Program Approach schedule. The conceptual thermal tests presented in this document represent a consolidation and update of previously defined tests that should result in a more efficient use of Project resources. This document focuses on defining the requirements and tests needed to satisfy the goal of a successful license application in 2001, should the site be found suitable

  5. Agile metodologies use for software development in Slovenian start-ups

    OpenAIRE

    Kašnik, Matic

    2014-01-01

    The thesis presents and describes the use of agile methodologies which are being used by Slovenian tech start-up companies. It describes the basic features, advantages and disadvantages of various agile methodologies such as Scrum, extreme programming, lean start-up and method Kanban. We made a review of the most used agile methodologies in Slovenian technology start-up companies. In particular, we focus on variety of tools, technics and approaches used by the development teams and where do t...

  6. V2I-based startup assistance system at signalized intersections

    Directory of Open Access Journals (Sweden)

    Jianqiang Wang

    2015-08-01

    Full Text Available Traffic delays are caused by unskilled vehicle operation and driver distraction during the startup process at signalized intersections. To address this issue, we propose a V2I-based driver assistance system that can acquire the current traffic signal status and provide drivers with startup assistance. This article presents the proposed system’s architecture and an assistance algorithm, which contains two types of driver assistance methods: startup prompting and automatic startup control. The automatic startup control method, based on fuzzy logic control, is validated in simulation tests. We also implement startup prompting using a prototype system and validate its performance in field tests. The test results suggest that the proposed assistance algorithm can help drivers start up their vehicles with less delay, which will significantly improve traffic efficiency.

  7. The NRU blowdown test facility commissioning program

    Energy Technology Data Exchange (ETDEWEB)

    Walsworth, J A; Zanatta, R J; Yamazaki, A R; Semeniuk, D D; Wong, W; Dickson, L W; Ferris, C E; Burton, D H [Atomic Energy of Canada Ltd., Chalk River, ON (Canada). Chalk River Nuclear Labs.

    1990-12-31

    A major experimental program has been established at the Chalk River Nuclear Laboratories (CRL) that will provide essential data on the thermal and mechanical behaviour of nuclear fuel under abnormal reactor operating conditions and on the transient release, transport and deposition of fission product activity from severely degraded fuel. A number of severe fuel damage (SFD) experiments will be conducted within the Blowdown Test Facility (BTF) at CRL. A series of experiments are being conducted to commission this new facility prior to the SFD program. This paper describes the features and the commissioning program for the BTF. A development and testing program is described for critical components used on the reactor test section. In-reactor commissioning with a fuel assembly simulator commenced in 1989 June and preliminary results are given. The paper also outlines plans for future all-effects, in-reactor tests of CANDU-designed fuel. (author). 11 refs., 3 tabs., 7 figs.

  8. Programmed Death-Ligand 1 Immunohistochemistry Testing

    DEFF Research Database (Denmark)

    Büttner, Reinhard; Gosney, John R; Skov, Birgit Guldhammer

    2017-01-01

    Purpose Three programmed death-1/programmed death-ligand 1 (PD-L1) inhibitors are currently approved for treatment of non-small-cell lung cancer (NSCLC). Treatment with pembrolizumab in NSCLC requires PD-L1 immunohistochemistry (IHC) testing. Nivolumab and atezolizumab are approved without PD-L1...

  9. 40 CFR 68.77 - Pre-startup review.

    Science.gov (United States)

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The... stationary sources when the modification is significant enough to require a change in the process safety... substances to a process: (1) Construction and equipment is in accordance with design specifications; (2...

  10. Program Helps Design Tests Of Developmental Software

    Science.gov (United States)

    Hops, Jonathan

    1994-01-01

    Computer program called "A Formal Test Representation Language and Tool for Functional Test Designs" (TRL) provides automatic software tool and formal language used to implement category-partition method and produce specification of test cases in testing phase of development of software. Category-partition method useful in defining input, outputs, and purpose of test-design phase of development and combines benefits of choosing normal cases having error-exposing properties. Traceability maintained quite easily by creating test design for each objective in test plan. Effort to transform test cases into procedures simplified by use of automatic software tool to create cases based on test design. Method enables rapid elimination of undesired test cases from consideration and facilitates review of test designs by peer groups. Written in C language.

  11. Control device for start-up of reactor depressurization system

    International Nuclear Information System (INIS)

    Suzuki, Hiroshi; Saito, Minoru; Oda, Shingo; Miura, Satoshi; Hashimoto, Koji; Tate, Hitoshi; Fujii, Kazunobu

    1998-01-01

    The present invention concerns are emergency reactor core cooling system (ECCS) of a BWR type reactor and provides a control device for start-up of an automatic depressurization system. Namely, the device has an object of preventing erroneous opening of a main steam escape safety value when testing a start-up signal circuit of an automatic depressurization system for testing the automatic depressurization system. A start-up signal circuit receives both signals of a reactor container pressure high signal and a reactor pressure vessel water level low signal and outputs an automatic start-up signal for compulsorily opening a main steam escape safety valve automatically. A test switch having a self-holding circuit is disposed to a central control chamber. A test signal circuit is disposed for preventing transfer of an erroneous start-up signal to the main steam escape safety valve due to a simulation signal during output test signals by the test switch. (I.S.)

  12. The advanced test reactor strategic evaluation program

    International Nuclear Information System (INIS)

    Buescher, B.J.

    1989-01-01

    Since the Chernobly accident, the safety of test reactors and irradiation facilities has been critically evaluated from the public's point of view. A systematic evaluation of all safety, environmental, and operational issues must be made in an integrated manner to prioritize actions to maximize benefits while minimizing costs. Such a proactive program has been initiated at the Advanced Test Reactor (ATR). This program, called the Strategic Evaluation Program (STEP), is being conducted for the ATR to provide integrated safety and operational reviews of the reactor against the standards applied to licensed commercial power reactors. This has taken into consideration the lessons learned by the US Nuclear Regulatory Commission (NRC) in its Systematic Evaluation Program (SEP) and the follow-on effort known as the Integrated Safety Assessment Program (ISAP). The SEP was initiated by the NRC to review the designs of older operating nuclear power plants to confirm and document their safety. The ATR STEP objectives are discussed

  13. Periodical test program in depth revision

    International Nuclear Information System (INIS)

    Feltin, C.; Zermizoglou, R.

    1987-11-01

    Inspection visits made to different sites during 1980 and 1981 evidenced the need to extend and define more precisely the periodical tests performed on safety related systems; thus Electricite de France was requested by the Safety Authorities to re-examine the periodical test program for all safety related systems. This paper presents the methodology adopted by Electricite de France in order to perform an exhaustive analysis of the periodical test program for the 900 and 1300 MWe plants, and the organization set up at the IPSN at one hand and Electricite de France on the other hand for the purpose of elaborating a periodical test program which would be ratified by the Safety Authorities

  14. Recommended well drilling and testing program

    International Nuclear Information System (INIS)

    Long, J.; Wilson, C.

    1978-07-01

    A well drilling and testing program is recommended by Lawrence Berkeley Laboratory to identify the hydrology of deep basalts in the Pasco Basin. The ultimate objective of this program is to assist in determining the feasibility of locating a nuclear waste repository on the Hanford Reservation. The recommended program has been staged for maximum effectiveness. In the first stage, six wells have been identified for drilling and testing which, when coupled with existing wells, will provide sufficient data for a preliminary overview of basin hydrology and a preliminary determination of the hydrologic suitability of the deep basalt for a repository site. The rate at which the first stage wells are drilled and tested will depend upon the date at which a preliminary determination of site suitability is required. It was assumed that a preliminary determination of suitability would be required in 1980, in which case all six first stage wells would be drilled in FY 1979. If the results of the first stage analysis are favorable for repository siting, tentative repository sites can be identified and a second stage hydrology program can be implemented to provide the necessary details of the flow system. To accomplish this stage, a number of deep wells would be required at locations both inside and outside the basin, with specific sites to be identified as the work progresses to obtain maximum utility of existing data. A program is recommended for testing in each new well and for completion of testing in each existing well. Recommended tests include borehole geophysics, pressure and permeability testing, geochemical sampling, tracer testing, hydrofracturing and borehole fracture logging. The entire data collection program is oriented toward providing the information required to establish and verify an accurate numerical model of the Pasco Basin

  15. The design of control algorithm for automatic start-up model of HWRR

    International Nuclear Information System (INIS)

    Guo Wenqi

    1990-01-01

    The design of control algorithm for automatic start-up model of HWRR (Heavy Water Research Reactor), the calculation of μ value and the application of digital compensator are described. Finally The flow diagram of the automatic start-up and digital compensator program for HWRR are given

  16. Quality assurance in the nuclear test program

    International Nuclear Information System (INIS)

    Shearer, J.N.

    1979-01-01

    In February 1979 Test Program laid the ground work for a new quality assurance structure. The new approach was based on the findings and recommendations of the Ad Hoc QA Program Review panel, which are summarized in this report. The new structure places the responsibility for quality assurance in the hands of the line organizations, both in the programmatic and functional elements of the LLL matrix

  17. Tritium systems test assembly quality assurance program

    International Nuclear Information System (INIS)

    Kerstiens, F.L.; Wilhelm, R.C.

    1986-07-01

    A quality assurance program should establish the planned and systematic actions necessary to provide adequate confidence that fusion facilities and their subsystems will perform satisfactorily in service. The Tritium Systems Test Assembly (TSTA) Quality Assurance Program has been designed to assure that the designs, tests, data, and interpretive reports developed at TSTA are valid, accurate, and consistent with formally specified procedures and reviews. The quality consideration in all TSTA activities is directed toward the early detection of quality problems, coupled with timely and positive disposition and corrective action

  18. Preliminary considerations on the startup phase for the ASTRID core

    International Nuclear Information System (INIS)

    Mignot, G.

    2015-01-01

    This paper presents preliminary considerations on the startup phase for the ASTRID core, as well as an overview of the different steps before reaching the optimised equilibrium core. The start-up phase is assumed to cover the period between loading the dummy core into the reactor (for commissioning tests) and achieving the optimised equilibrium core. Four main stages are considered: a first stage of start-up tests before fuel core loading, a second stage related to zero power and power ramp-up tests, a third stage corresponding to the transition from the first core to the equilibrium contractual core, and the last stage to reach the optimised performance for the equilibrium core. In the two last stages, a sub-assembly surveillance plan based on post-irradiation examinations is taken into account. As this work is in its preliminary stages, the first scenarios shown for the start-up phase must not be considered as the ASTRID reference scenarios. The scenarios strongly depend on the assumptions considered in the analysis, whereas those discussed in this paper aim at outlining the content and the duration of the starting phases for the ASTRID core, which will be useful in subsequently assessing the core sub-assembly fabrication needs. Assumptions for the start-up phase will be updated in accordance with progress on the ASTRID core design development and core qualification programme. (author)

  19. The WIPP research and development test program

    International Nuclear Information System (INIS)

    Tyler, L.D.

    1985-01-01

    The WIPP (Waste Isolation Pilot Plant) is a DOE RandD Facility for the purpose of developing the technology needed for the safe disposal of the United States defense-related radioactive waste. The in-situ test program is defined for the thermal-structural interactions, plugging and sealing, and waste package interactions in a salt environment. An integrated series of large-scale underground tests address the issues of both systems and long-term isolation performance of a repository

  20. Light duty utility arm startup plan

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1998-01-01

    This Startup Plan encompasses activities necessary to perform startup and operation of the LDUA in Facility Group 3 tanks and complete turnover to CPO. The activities discussed in this plan will occur prior to, and following the US Department Energy, Richland Operations Office Operational Readiness Review. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this startup plan need not be Unresolved Safety Question (USQ) screened

  1. MODEL OF IT-STARTUPS MANAGEMENT

    OpenAIRE

    КОЗИНА, Ольга Андреевна; СТРАТИЕНКО, Наталия Константиновна

    2017-01-01

    Decrease mortality of startups during first three years of existing is an important task of the economy of any country. It has been established that the existing methods of enterprise management have some disadvantages or limits for using in IT-startups management. Analysis of mortality reasons of startups in different stages of their life cycle has been carried out. The comparing of reasons why startups in different time intervals, in different areas of them functioning are failure showed th...

  2. Startup activities of established Finnish companies

    OpenAIRE

    Saalasti, Sini

    2016-01-01

    Established companies have collaborated with startups for decades in order to enhance their capabilities in technology and innovation. However, in the recent years, the changes in the business environment have induced established companies to increase their collaboration with startups. Thus, startup activities of established companies have become a timely phenomenon. This study explores the startup activities of established companies by analyzing all the activity established companies conduct...

  3. Cooperative field test program for wind systems

    Energy Technology Data Exchange (ETDEWEB)

    Bollmeier, W.S. II; Dodge, D.M.

    1992-03-01

    The objectives of the Federal Wind Energy Program, managed by the US Department of Energy (DOE), are (1) to assist industry and utilities in achieving a multi-regional US market penetration of wind systems, and (2) to establish the United States as the world leader in the development of advanced wind turbine technology. In 1984, the program conducted a series of planning workshops with representatives from the wind energy industry to obtain input on the Five-Year Research Plan then being prepared by DOE. One specific suggestion that came out of these meetings was that the federal program should conduct cooperative research tests with industry to enhance the technology transfer process. It was also felt that the active involvement of industry in DOE-funded research would improve the state of the art of wind turbine technology. DOE established the Cooperative Field Test Program (CFTP) in response to that suggestion. This program was one of the first in DOE to feature joint industry-government research test teams working toward common objectives.

  4. 47 CFR 73.1620 - Program tests.

    Science.gov (United States)

    2010-10-01

    ... integration of ownership and management and diversification of the media of mass communciation contained in... 47 Telecommunication 4 2010-10-01 2010-10-01 false Program tests. 73.1620 Section 73.1620 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES...

  5. NRC valve performance test program - check valve testing

    International Nuclear Information System (INIS)

    Jeanmougin, N.M.

    1987-01-01

    The Valve Performance Test Program addresses the current requirements for testing of pressure isolation valves (PIVs) in light water reactors. Leak rate monitoring is the current method used by operating commercial power plants to survey the condition of their PIVs. ETEC testing of three check valves (4-inch, 6-inch, and 12-inch nominal diameters) indicates that leak rate testing is not a reliable method for detecting impending valve failure. Acoustic emission monitoring of check valves shows promise as a method of detecting loosened internals damage. Future efforts will focus on evaluation of acoustic emission monitoring as a technique for determining check valve condition. Three gate valves also will be tested to evaluate whether the check valve results are applicable to gate type PIVs

  6. Final Report Start-Up And Commissioning Tests On The Duramelter 1200 HLW Pilot Melter System Using AZ-101 HLW Simulants VSL-01R0100-2, Rev. 0, 1/20/03

    International Nuclear Information System (INIS)

    Kruger, A.A.; Matlack, K.S.; Kot, W.K.; Brandys, M.; Wilson, C.N.; Schatz, T.R.; Gong, W.; Pegg, I.L.

    2011-01-01

    This document provides the final report on data and results obtained from commissioning tests performed on the one-third scale DuraMelter(trademark) 1200 (DM 1200) HLW Pilot Melter system that has been installed at VSL with an integrated prototypical off-gas treatment system. That system has replaced the DM1000 system that was used for HLW throughput testing during Part BI (1). Both melters have similar melt surface areas (1.2 m 2 ) but the DM1200 is prototypical of the present RPP-WTP HLW melter design whereas the DM1000 was not. These tests were performed under a corresponding RPP-WTP Test Specification and associated Test Plan. This report is a followup to the previously issued Preliminary Data Summary Report. The DM1200 system will be used for testing and confirmation of basic design, operability, flow sheet, and process control assumptions as well as for support of waste form qualification and permitting. This will include data on processing rates, off-gas treatment system performance, recycle stream compositions, as well as process operability and reliability. Consequently, this system is a key component of the overall HLW vitrification development strategy. The results presented in this report are from the initial series of short-duration tests that were conducted to support the start-up and commissioning of this system prior to conducting the main body of development tests that have been planned for this system. These tests were directed primarily at system 'debugging,' operator training, and procedure refinement. The AZ-101 waste simulant and glass composition that was used for previous testing was selected for these tests.

  7. FINAL REPORT START-UP AND COMMISSIONING TESTS ON THE DURAMELTER 1200 HLW PILOT MELTER SYSTEM USING AZ-101 HLW SIMULANTS VSL-01R0100-2 REV 0 1/20/03

    Energy Technology Data Exchange (ETDEWEB)

    KRUGER AA; MATLACK KS; KOT WK; BRANDYS M; WILSON CN; SCHATZ TR; GONG W; PEGG IL

    2011-12-29

    This document provides the final report on data and results obtained from commissioning tests performed on the one-third scale DuraMelter{trademark} 1200 (DM 1200) HLW Pilot Melter system that has been installed at VSL with an integrated prototypical off-gas treatment system. That system has replaced the DM1000 system that was used for HLW throughput testing during Part BI [1]. Both melters have similar melt surface areas (1.2 m{sup 2}) but the DM1200 is prototypical of the present RPP-WTP HLW melter design whereas the DM1000 was not. These tests were performed under a corresponding RPP-WTP Test Specification and associated Test Plan. This report is a followup to the previously issued Preliminary Data Summary Report. The DM1200 system will be used for testing and confirmation of basic design, operability, flow sheet, and process control assumptions as well as for support of waste form qualification and permitting. This will include data on processing rates, off-gas treatment system performance, recycle stream compositions, as well as process operability and reliability. Consequently, this system is a key component of the overall HLW vitrification development strategy. The results presented in this report are from the initial series of short-duration tests that were conducted to support the start-up and commissioning of this system prior to conducting the main body of development tests that have been planned for this system. These tests were directed primarily at system 'debugging,' operator training, and procedure refinement. The AZ-101 waste simulant and glass composition that was used for previous testing was selected for these tests.

  8. The High Level Vibration Test Program

    International Nuclear Information System (INIS)

    Hofmayer, C.H.; Curreri, J.R.; Park, Y.J.; Kato, W.Y.; Kawakami, S.

    1989-01-01

    As part of cooperative agreements between the United States and Japan, tests have been performed on the seismic vibration table at the Tadotsu Engineering Laboratory of Nuclear Power Engineering Test Center (NUPEC) in Japan. The objective of the test program was to use the NUPEC vibration table to drive large diameter nuclear power piping to substantial plastic strain with an earthquake excitation and to compare the results with state-of-the-art analysis of the problem. The test model was designed by modifying the 1/2.5 scale model of the PWR primary coolant loop. Elastic and inelastic seismic response behavior of the test model was measured in a number of test runs with an increasing excitation input level up to the limit of the vibration table. In the maximum input condition, large dynamic plastic strains were obtained in the piping. Crack initiation was detected following the second maximum excitation run. The test model was subjected to a maximum acceleration well beyond what nuclear power plants are designed to withstand. This paper describes the overall plan, input motion development, test procedure, test results and comparisons with pre-test analysis. 4 refs., 16 figs., 2 tabs

  9. The High Level Vibration Test program

    International Nuclear Information System (INIS)

    Hofmayer, C.H.; Curreri, J.R.; Park, Y.J.; Kato, W.Y.; Kawakami, S.

    1990-01-01

    As part of cooperative agreements between the United States and Japan, tests have been performed on the seismic vibration table at the Tadotsu Engineering Laboratory of Nuclear Power Engineering Test Center (NUPEC) in Japan. The objective of the test program was to use the NUPEC vibration table to drive large diameter nuclear power piping to substantial plastic strain with an earthquake excitation and to compare the results with state-of-the-art analysis of the problem. The test model was designed by modifying the 1/2.5 scale model of the pressurized water reactor primary coolant loop. Elastic and inelastic seismic response behavior of the test model was measured in a number of test runs with an increasing excitation input level up to the limit of the vibration table. In the maximum input condition, large dynamic plastic strains were obtained in the piping. Crack initiation was detected following the second maximum excitation run. The test model was subjected to a maximum acceleration well beyond what nuclear power plants are designed to withstand. This paper describes the overall plan, input motion development, test procedure, test results and comparisons with pre-test analysis

  10. 1/3-scale model testing program

    International Nuclear Information System (INIS)

    Yoshimura, H.R.; Attaway, S.W.; Bronowski, D.R.; Uncapher, W.L.; Huerta, M.; Abbott, D.G.

    1989-01-01

    This paper describes the drop testing of a one-third scale model transport cask system. Two casks were supplied by Transnuclear, Inc. (TN) to demonstrate dual purpose shipping/storage casks. These casks will be used to ship spent fuel from DOEs West Valley demonstration project in New York to the Idaho National Engineering Laboratory (INEL) for long term spent fuel dry storage demonstration. As part of the certification process, one-third scale model tests were performed to obtain experimental data. Two 9-m (30-ft) drop tests were conducted on a mass model of the cask body and scaled balsa and redwood filled impact limiters. In the first test, the cask system was tested in an end-on configuration. In the second test, the system was tested in a slap-down configuration where the axis of the cask was oriented at a 10 degree angle with the horizontal. Slap-down occurs for shallow angle drops where the primary impact at one end of the cask is followed by a secondary impact at the other end. The objectives of the testing program were to (1) obtain deceleration and displacement information for the cask and impact limiter system, (2) obtain dynamic force-displacement data for the impact limiters, (3) verify the integrity of the impact limiter retention system, and (4) examine the crush behavior of the limiters. This paper describes both test results in terms of measured deceleration, post test deformation measurements, and the general structural response of the system

  11. Plutonium Immobilization Program cold pour tests

    International Nuclear Information System (INIS)

    Hovis, G.L.; Stokes, M.W.; Smith, M.E.; Wong, J.W.

    1999-01-01

    The Plutonium Immobilization Program (PIP) is a joint venture between the Savannah River Site, Lawrence Livermore National Laboratory, Argonne National Laboratory, and Pacific Northwest National Laboratory to carry out the disposition of excess weapons-grade plutonium. This program uses the can-in-canister (CIC) approach. CIC involves encapsulating plutonium in ceramic forms (or pucks), placing the pucks in sealed stainless steel cans, placing the cans in long cylindrical magazines, latching the magazines to racks inside Defense Waste Processing Facility (DWPF) canisters, and filling the DWPF canisters with high-level waste glass. This process puts the plutonium in a stable form and makes it attractive for reuse. At present, the DWPF pours glass into empty canisters. In the CIC approach, the addition of a stainless steel rack, magazines, cans, and ceramic pucks to the canisters introduces a new set of design and operational challenges: All of the hardware installed in the canisters must maintain structural integrity at elevated (molten-glass) temperatures. This suggests that a robust design is needed. However, the amount of material added to the DWPF canister must be minimized to prevent premature glass cooling and excessive voiding caused by a large internal thermal mass. High metal temperatures, minimizing thermal mass, and glass flow paths are examples of the types of technical considerations of the equipment design process. To determine the effectiveness of the design in terms of structural integrity and glass-flow characteristics, full-scale testing will be conducted. A cold (nonradioactive) pour test program is planned to assist in the development and verification of a baseline design for the immobilization canister to be used in the PIP process. The baseline design resulting from the cold pour test program and CIC equipment development program will provide input to Title 1 design for second-stage immobilization. The cold pour tests will be conducted in two

  12. Nevada Test Site Radiation Protection Program

    Energy Technology Data Exchange (ETDEWEB)

    Radiological Control Managers' Council, Nevada Test Site

    2007-08-09

    Title 10 Code of Federal Regulations (CFR) 835, 'Occupational Radiation Protection', establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (onsite or offsite) DOE National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration offsite projects.

  13. FFTF operational results: startup to 100 MWd/kg

    International Nuclear Information System (INIS)

    Baird, Q.L.; Harris, R.A.

    1985-01-01

    The Fast Flux Test Facility (FFTF) is a 400-MW(t) sodium-cooled fast reactor operating at the Hanford Engineering Development Laboratory in Richland, Washington, to conduct fuels and materials testing in support of the US liquid-metal fast breeder reactor program. Startup and initial power testing included a comprehensive series of nuclear and nonnuclear tests to verify the thermal and neutronic characteristics of the plant and to demonstrate its inherent safety features. Extensive reactor core characterization measurements were completed to provide the neutron and gamma spectra, fission rates, and other physics data needed to design and evaluate tests irradiated in the FFTF. A specially designed series of natural-circulation tests was performed to demonstrate the inherent safety features of the plant. Early in 1982 the FFTF began its first 100-d irradiation cycle. Since that time the plant has operated beyond expectations; it achieved a cycle capacity factor of 99.5% in the most recent irradiation cycle. One hundred fifty fuel assemblies (80 of which are experiments) and over 32,000 individual fuel pins have been irradiated, some in excess of 100 MWd/kg. Specialized equipment and systems unique to sodium-cooled reactor plants have performed well. There have been no sodium leaks in the 6 y of sodium system operation. Liquid-metal system maintenance techniques have been proven reliable. Plant maintenance and operating personnel radiation exposures have been very low. 15 figs

  14. First physical start-up for the first pulsed reactor in China

    International Nuclear Information System (INIS)

    Huang Wenlou; Tan Rilin; Xie Yuqi; Chai Songshan; Li Yingfa; He Qianming; Zhou Bin

    1993-01-01

    The characteristics and the test results of initial loading fuel and first physical start-up for the first pulsed reactor in China (PRC-1) are described. Safe measure to ensure safety of first physical start-up are also described. The experiments show that performances of PRC-1 are in accord with design requirements

  15. Network brokers or hit makers? Analyzing the influence of incubation on start-up investments

    NARCIS (Netherlands)

    Van Rijnsoever, Frank J.; Van Weele, Marijn A.; Eveleens, Chris P.

    Incubators are a prominent way to support technology based start-ups. Yet, it remains unclear to what extent these incubators enhance start-up performance, nor is it known through which mechanisms this would occur. In this paper we test two mechanisms to explain the relationship between incubation

  16. Startup of a Joule-heated glass melter with a graphite slurry

    International Nuclear Information System (INIS)

    Allen, T.L.; Porter, M.A.; Routt, K.R.

    1984-01-01

    Startup of a Joule-heated glass melter using a graphite slurry as a conducting medium was demonstrated. This technique can be used for the initial startup and for the restart of a melter used for vitrifying high-level radioactive waste. Theory, physical property data, and a demonstration test are reported

  17. The high level vibration test program

    International Nuclear Information System (INIS)

    Hofmayer, C.H.; Curreri, J.R.; Park, Y.J.; Kato, W.Y.; Kawakami, S.

    1989-01-01

    As part of cooperative agreements between the US and Japan, tests have been performed on the seismic vibration table at the Tadotsu Engineering Laboratory of Nuclear Power Engineering Test Center (NUPEC) in Japan. The objective of the test program was to use the NUPEC vibration table to drive large diameter nuclear power piping to substantial plastic strain with an earthquake excitation and to compare the results with state-of-the-art analysis of the problem. The test model was subjected to a maximum acceleration well beyond what nuclear power plants are designed to withstand. A modified earthquake excitation was applied and the excitation level was increased carefully to minimize the cumulative fatigue damage due to the intermediate level excitations. Since the piping was pressurized, and the high level earthquake excitation was repeated several times, it was possible to investigate the effects of ratchetting and fatigue as well. Elastic and inelastic seismic response behavior of the test model was measured in a number of test runs with an increasing excitation input level up to the limit of the vibration table. In the maximum input condition, large dynamic plastic strains were obtained in the piping. Crack initiation was detected following the second maximum excitation run. Crack growth was carefully monitored during the next two additional maximum excitation runs. The final test resulted in a maximum crack depth of approximately 94% of the wall thickness. The HLVT (high level vibration test) program has enhanced understanding of the behavior of piping systems under severe earthquake loading. As in other tests to failure of piping components, it has demonstrated significant seismic margin in nuclear power plant piping

  18. The Advanced Test Reactor Strategic Evaluation Program

    International Nuclear Information System (INIS)

    Buescher, B.J.

    1990-01-01

    A systematic evaluation of safety, environmental, and operational issues has been initiated at the Advanced Test Reactor (ATR). This program, the Strategic Evaluation Program (STEP), provides an integrated review of safety and operational issues against the standards applied to licensed commercial facilities. In the review of safety issues, 18 deviations were identified which required prompt attention. Resolution of these items has been accelerated in the program. An integrated living schedule is being developed to address the remaining findings. A risk evaluation is being performed on the proposed corrective actions and these actions will then be formally ranked in order of priority based on considerations of safety and operational significance. Once the final ranking is completed, an integrated schedule will be developed, which will include considerations of availability of funding and operating schedule. 3 refs., 2 figs

  19. NRC Confirmatory Testing Program for SBWR

    International Nuclear Information System (INIS)

    Han, J.T.; Bessette, D.E.; Shotkin, L.M.

    1994-01-01

    The objective of the NRC Confirmatory Testing Program for SBWR is to provide integral data for code assessment, which reasonably reproduce the important phenomena and processes expected in the SBWR under various loss-of-coolant accident (LOCA) and transient conditions. To achieve this objective, the Program consists of four coupled elements: (1) to design and construct an integral, carefully-scaled SBWR test facility at Purdue Univ., (2) to provide pre-construction RELAP5/CONTAIN predictions of the facility design, (3) to provide confirmatory data for code assessment, and (4) to assess the RELAP5/CONTAIN code with data. A description of the open-quotes preliminary designclose quotes of the Purdue test facility and test matrix is presented. The facility is scheduled to be built by December 1994. Approximately 50 tests will be performed from April 1995 through April 1996 and documented by interim data reports. A final and complete data report is scheduled to be published by July 31, 1996

  20. Management of the interfaces between construction and startup

    International Nuclear Information System (INIS)

    Anderson, W.R.; Beatty, D.C.

    1976-01-01

    Many papers have been presented, and many articles published on the various tasks of Nuclear Plant Design, Construction, Startup and Operations. Most of the presentations have been concerned with the complexities of the particular task being discussed. This is as it should be, since these areas are quite broad in themselves and deserve the full attention of the technology. Recently more attention is being directed to the interfaces between the classical portions of nuclear projects. The paper attempts to address just one of these areas: the interfaces between construction and startup. These interfaces have normally been addressed to the extent that engineering schedules, construction schedules, equipment deliveries and startup test schedules have been dovetailed graphically, or computerized, and periodically updated to reflect significant changes

  1. Startup work on Inshas cyclotron

    International Nuclear Information System (INIS)

    Vorogushin, M.F.; Strokach, A.P.; Shikhov, V.Ya.; Galchuk, A.V.; Soliman, A.N.; El-Abyad, M.; Comsan, M.N.H.; Saleh, Z.A.; Azzam, A.N.

    2001-01-01

    Startup works on the MGC-20 variable energy cyclotron in the Inshas Nuclear Research Center (Egypt) are described. The cyclotron is intended for acceleration of hydrogen and helium ions in a wide energy range (for protons - from 5 to 20 MeV). Main units of the cyclotron and results of computer experimental acceleration of protons to 18 MeV are described. The prospects of furthers investigations are presented [ru

  2. Runaway electrons during tokamak startup

    International Nuclear Information System (INIS)

    Sharma, A.S.; Jayakumar, R.

    1988-01-01

    Runaway electrons significantly affect the plasma and impurity evolution during tokamak startup. During its rise, a runaway pulse stores magnetic flux inductively; this is then released during the decay phase of the runaway pulse. This process affects plasma formation, current initiation and current buildup. Because of their relativistic velocities the runaway electrons have higher ionization and excitation rates than the plasma electrons. This leads to a significant modification of the impurity behaviour and consequently the plasma evolution. (author). 20 refs, 8 figs

  3. An enhanced tokamak startup model

    Science.gov (United States)

    Goswami, Rajiv; Artaud, Jean-François

    2017-01-01

    The startup of tokamaks has been examined in the past in varying degree of detail. This phase typically involves the burnthrough of impurities and the subsequent rampup of plasma current. A zero-dimensional (0D) model is most widely used where the time evolution of volume averaged quantities determines the detailed balance between the input and loss of particle and power. But, being a 0D setup, these studies do not take into consideration the co-evolution of plasma size and shape, and instead assume an unchanging minor and major radius. However, it is known that the plasma position and its minor radius can change appreciably as the plasma evolves in time to fill in the entire available volume. In this paper, an enhanced model for the tokamak startup is introduced, which for the first time takes into account the evolution of plasma geometry during this brief but highly dynamic period by including realistic one-dimensional (1D) effects within the broad 0D framework. In addition the effect of runaway electrons (REs) has also been incorporated. The paper demonstrates that the inclusion of plasma cross section evolution in conjunction with REs plays an important role in the formation and development of tokamak startup. The model is benchmarked against experimental results from ADITYA tokamak.

  4. Accelerated Leach Test(s) Program. Annual report

    International Nuclear Information System (INIS)

    Dougherty, D.R.; Fuhrmann, M.; Colombo, P.

    1985-09-01

    This report summarizes the work performed for the Accelerated Leach Test(s) Program at Brookhaven National Laboratory in Fiscal Year 1985 under the sponsorship of the US Department of Energy's Low-Level Waste Management Program (LLWMP). Programmatic activities were concentrated in three areas, as listed and described in the following paragraphs. (1) A literature survey of reported leaching mechanisms, available mathematical models and factors that affect leaching of LLW forms has been compiled. Mechanisms which have been identified include diffusion, dissolution, ion exchange, corrosion and surface effects. Available mathematical models are based on diffusion as the predominant mechanism. Although numerous factors that affect leaching have been identified, they have been conveniently categorized as factors related to the entire leaching system, to the leachant or to the waste form. A report has been published on the results of this literature survey. (2) A computerized data base of LLW leaching data and mathematical models is being developed. The data are being used for model evaluation by curve fitting and statistical analysis according to standard procedures of statistical quality control. (3) Long-term tests on portland cement, bitumen and vinyl ester-styrene (VES) polymer waste forms are underway which are designed to identify and evaluate factors that accelerate leaching without changing the mechanisms. Results on the effect of temperature on leachability indicate that the leach rates of cement and VES waste forms increase with increasing temperature, whereas, the leach rate of bitumen is little affected

  5. Safety quality classification test of the sealed neutron sources used in start-up neutron source rods for Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Yao Chunbing; Guo Gang; Chao Jinglan; Duan Liming

    1992-01-01

    According to the regulations listed in the GB4075, the safety quality classification tests have been carried out for the neutron sources. The test items include temperature, external pressure, impact, vibration and puncture, Two dummy sealed sources are used for each test item. The testing equipment used have been examined and verified to be qualified by the measuring department which is admitted by the National standard Bureau. The leak rate of each tested sample is measured by UL-100 Helium Leak Detector (its minimum detectable leak rate is 1 x 10 -10 Pa·m 3 ·s -1 ). The samples with leak rate less than 1.33 x 10 -8 Pa·m 3 ·s -1 are considered up to the standard. The test results show the safety quality classification class of the neutron sources have reached the class of GB/E66545 which exceeds the preset class

  6. How My Program Passed the Turing Test

    Science.gov (United States)

    Humphrys, Mark

    In 1989, the author put an ELIZA-like chatbot on the Internet. The conversations this program had can be seen - depending on how one defines the rules (and how seriously one takes the idea of the test itself) - as a passing of the Turing Test. This is the first time this event has been properly written. This chatbot succeeded due to profanity, relentless aggression, prurient queries about the user, and implying that they were a liar when they responded. The element of surprise was also crucial. Most chatbots exist in an environment where people expectto find some bots among the humans. Not this one. What was also novel was the onlineelement. This was certainly one of the first AI programs online. It seems to have been the first (a) AI real-time chat program, which (b) had the element of surprise, and (c) was on the Internet. We conclude with some speculation that the future of all of AI is on the Internet, and a description of the "World- Wide-Mind" project that aims to bring this about.

  7. MODEL OF IT-STARTUPS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ольга Андреевна КОЗИНА

    2017-03-01

    Full Text Available Decrease mortality of startups during first three years of existing is an important task of the economy of any country. It has been established that the existing methods of enterprise management have some disadvantages or limits for using in IT-startups management. Analysis of mortality reasons of startups in different stages of their life cycle has been carried out. The comparing of reasons why startups in different time intervals, in different areas of them functioning are failure showed that the run out of cash and the use of not viable business model have appeared mortality factors most often denoted by ex-leaders of startups. The model of startup management based on the lean startup model has been developed. Steps for the management of startups along first two stages of their life cycle were added. We noted that it is important to select set of static points and changeable points of startup during the process of formulation of the business model. Steps to reduce the number of iterations in the method of the lean startup are proposed.

  8. Loading of fuel and reflector elements in the Fort St. Vrain initial core (results of start-up test A-1)

    International Nuclear Information System (INIS)

    Marshall, A.C.; Brown, J.R.

    1974-01-01

    R A description is given of the experimental equipment and techniques used in the fuel and reflector loading. The analysis methods are described and test data are compared with predicted results. (U.S.)

  9. Startup transient simulation for natural circulation boiling water reactors in PUMA facility

    International Nuclear Information System (INIS)

    Kuran, S.; Xu, Y.; Sun, X.; Cheng, L.; Yoon, H.J.; Revankar, S.T.; Ishii, M.; Wang, W.

    2006-01-01

    In view of the importance of instabilities that may occur at low-pressure and -flow conditions during the startup of natural circulation boiling water reactors, startup simulation experiments were performed in the Purdue University Multi-Dimensional Integral Test Assembly (PUMA) facility. The simulations used pressure scaling and followed the startup procedure of a typical natural circulation boiling water reactor. Two simulation experiments were performed for the reactor dome pressures ranging from 55 kPa to 1 MPa, where the instabilities may occur. The experimental results show the signature of condensation-induced oscillations during the single-phase-to-two-phase natural circulation transition. The results also suggest that a rational startup procedure is needed to overcome the startup instabilities in natural circulation boiling water reactor designs

  10. Effect of non-condensable gas on startup of a loop thermosyphon

    International Nuclear Information System (INIS)

    He, Jiang; Lin, Guiping; Bai, Lizhan; Miao, Jianyin; Zhang, Hongxing; Wang, Lu

    2013-01-01

    Non-condensable gas (NCG) generated inside two-phase heat transfer devices can adversely affect the thermal performance and limit the lifetime of such devices. In this work, experimental investigation of the effect of NCG on the startup of an ammonia-stainless steel loop thermosyphon was conducted. In the experiment, nitrogen was injected into the loop thermosyphon as NCG. The effect of NCG inventory on the startup behavior was investigated by adjusting the injected amount of nitrogen. The experimental results reveal that NCG prolongs the startup time and increases the startup liquid superheat and temperature overshoot; the more NCG exists in the loop thermosyphon, the higher the liquid superheat and temperature overshoot. When NCG is present in the system, boiling usually occurs in the evaporator before startup, but it does not mean the system will start up instantly, which differs from the conditions without NCG. Under all the conditions, increasing the heat load can effectively shorten the startup time but leads to a large temperature overshoot; forced convection cooling of the condenser has almost no effect on shortening the startup time especially for large NCG inventory situations, but it can effectively limit the temperature overshoot. For large NCG inventory situations, the loop thermosyphon can start up at a small heat load (5 W) or even without a heat load when the condenser is cooled by forced convection of ethanol. No failed start-ups occurred during any of the tests. (authors)

  11. Neutron flux distribution measurement in the Fort St. Vrain initial core (results of Fort St. Vrain start-up test A-7)

    International Nuclear Information System (INIS)

    Marshall, A.C.; Brown, J.R.

    1975-01-01

    A description is given of a test to measure the axial flux distribution at several radial locations in the Fort St. Vrain core representing unrodded, rodded, and partially rodded regions. The measurements were intended to verify the calculational accuracy of the three-dimensional calculational model used to compute axial power distributions for the Fort St. Vrain core. (U.S.)

  12. Business Startups: An analysis of selection and post-startup performance (Japanese)

    OpenAIRE

    YASUDA Takehiko

    2010-01-01

    This paper investigates how the pre-startup circumstances surrounding an entrepreneur, during the time when he or she decides to start a business, affects the post-startup performance. Based on the original dataset, sample selection models are estimated connecting nascent entrepreneurs' selection of a startup with actual entrepreneurs' performance post-startup. The results of this paper confirm that the individual attributes of nascent entrepreneurs, which make it easier (difficult) to decide...

  13. A Rational Business Startup Model

    Science.gov (United States)

    Chang, Milton

    2000-03-01

    The speaker will share his experience in starting high-tech companies using a low-risk startup model. Most technical people can use this approach to start a company that begins with a modest initial goal and grows the business over time. As the company builds infrastructure and the individuals gain experience, the ability to pursue big opportunities comes naturally. The result is more likely to be a company with a long-term vision, and with the management team retaining more of the ownership.

  14. Producing an Assistant Guide for Haaga-Helia StartUp School

    OpenAIRE

    Averina, Maria

    2016-01-01

    This product-oriented thesis was commissioned by the StartUp School (SUS), a program of Haaga-Helia University of Applied Sciences that supports Haaga-Helia students to become entrepreneurs. The StartUp School offers Haaga-Helia students a six-month assistant trainee position. Consequently, every half a year there is a new assistant at the StartUp School. The commissioning party was lacking an essential tool to introduce work tasks to new assistant interns. The objective of the thesis was...

  15. New start-up channels and multichannel analyzer at the RB reactor; Novi start-up kanali i videkanalni analizator na reaktoru Rb

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Markovic, H; Vranic, S; Dimitrijevic, Z; Pesic, M [Boris Kidric Institute of Nuclear Sciences Vinca, Beograd (Yugoslavia)

    1978-01-15

    New start-up channels and a multichannel analyzer were purchased in 1977 for the RB reactor. Both start-up channels contain BF{sub 3} neutron detectors, preamplifier, amplifier, single-channel analyzer, scaler, ratemeter, control unit, recording instrument. This document contains detailed technical description of these devices as well as characteristics of the multichannel analyzer which is being tested and will be used for measuring irradiation in the vicinity of the reactor.

  16. Loading and initial start-up testing of the low-enrichment uranium core for the Ohio State University research reactor

    International Nuclear Information System (INIS)

    Talnagi, J.W.

    1989-01-01

    Conversion of the Ohio State University Research Reactor (OSURR) from high-enrichment uranium (HEU) fuel to low-enrichment uranium (LEU) fuel elements was begun in August 1985, with funding provided by the U.S. Department of Energy (DOE) and the university. Conversion of the OSURR from HEU to LEU fuel was successfully completed. The reactor is operational at 10-kW steady-state thermal power. Measurements of selected core parameters have been made and compared with predicted values and previous values for the HEU core. In general, measured results agree well with predicted performance, and minor changes have been detected in certain core parameters as a result of the change to LEU fuel. Future plans include additional core testing and a possible increase in operating power

  17. Model citizens. Outsourcing helps start-up Medicare HMO.

    Science.gov (United States)

    Slavic, B; Adami, S

    1999-04-01

    Health Plans of Pennsylvania (HPP), the managed care arm of Crozer-Keystone Health System, in Media, Pa. Selecting the information systems and building the infrastructure to support the start-up of a new Medicare HMO product. HPP chose to outsource the information systems needed to integrate all the components of managed care administration into a cost-effective and cohesive program. Because of its aggressive programming and start-up of the MedCarePlus product offering, HPP became the first plan in the country to submit Medicare claims data electronically for encounter reporting to the Health Care Financing Administration (HCFA). "Through an integrated team approach, an organization truly can benefit from the economies of scale gained through outsourcing."

  18. Dampak Mentoring Pada Keberhasilan Start-Up Business: Studi Kasus Pada Start-Up Business di Indonesia [Mentoring the Impact of Success of a Start-Up Business: A Case Study of a Start-Up Business in Indonesia

    Directory of Open Access Journals (Sweden)

    Christina Yanita Setyawati

    2016-10-01

    Full Text Available Entrepreneurship is a highly developed science today, as well as in the world of education in Indonesia. Teaching entrepreneurship at the university level, especially at some universities in Surabaya, the second largest city in Indonesia, shows the positive impact that there were 74.03% of start-up businesses that survived and thrived in 2014. Based on the previous observation, some business start-ups are accompanied by a mentor. Mentoring is a process of forming and maintaining lasting relationships that develop intensively among seniors with juniors. The mentoring function includes career and psychosocial functions. The main purpose of this research is to study the relationship between mentoring and the success of a start-up business. This study is a quantitative descriptive study using a random sampling method to obtain 100 samples. The tool used to collect data was a questionnaire. The methodology used to analyze the quantitative description to test the hypothesis. The results of this study indicate that mentoring influences the success of a start-up business that was owned by university students in Surabaya, Indonesia by 32% and 78% was influenced by other variables.

  19. Startup of a Joule-heated glass melter with a graphite slurry

    International Nuclear Information System (INIS)

    Allen, T.L.; Routt, K.R.; Porter, M.A.

    1983-01-01

    This paper discusses the theoretical equations and physical and electrical property data of various graphite slurries for starting up a glass melter. An application test is also included to demonstrate the graphite slurry startup technique

  20. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  1. Cone penetrometer demonstration standard startup review checklist

    International Nuclear Information System (INIS)

    KRIEG, S.A.

    1998-01-01

    Startup readiness for the Cone Penetrometer Demonstration in AX Tank Farm will be verified through the application of a Standard Startup Review Checklist. This is a listing of those items essential to demonstrating readiness to start the Cone Penetrometer Demonstration in AX Tank Farm

  2. Start-up analysis for marketing strategy.

    Science.gov (United States)

    Griffith, M J; Baloff, N

    1984-01-01

    The complex start-up effect on utilization of health care services is too often overlooked or underestimated by marketing planners, leading to a range of negative consequences for both the users of services and the provider organization. Start-up analysis allows accurate estimation of these utilization effects for coordinated strategic planning among marketing finance, and operations.

  3. Spacecraft Testing Programs: Adding Value to the Systems Engineering Process

    Science.gov (United States)

    Britton, Keith J.; Schaible, Dawn M.

    2011-01-01

    Testing has long been recognized as a critical component of spacecraft development activities - yet many major systems failures may have been prevented with more rigorous testing programs. The question is why is more testing not being conducted? Given unlimited resources, more testing would likely be included in a spacecraft development program. Striking the right balance between too much testing and not enough has been a long-term challenge for many industries. The objective of this paper is to discuss some of the barriers, enablers, and best practices for developing and sustaining a strong test program and testing team. This paper will also explore the testing decision factors used by managers; the varying attitudes toward testing; methods to develop strong test engineers; and the influence of behavior, culture and processes on testing programs. KEY WORDS: Risk, Integration and Test, Validation, Verification, Test Program Development

  4. Startup and shutdown of the PULSAR Tokamak Reactor

    International Nuclear Information System (INIS)

    Werley, K.A.; Bathke, C.G.

    1994-01-01

    Start-up conditions are examined for a pulsed tokamak reactor that uses only inductive plasma current drive for startup, burn and shutdown. A zero-dimensional (profile-averaged) model that describes plasma power and particle balance equations is used to study several aspects of plasma startup and shutdown, including optimization of the startup pathway tradeoff of auxiliary startup heating power versus startup time, volt-second consumtion, thermal stability and partial-power operations

  5. WIPP startup: Overcoming unprecedented challenges

    International Nuclear Information System (INIS)

    Hunt, Arlen E.

    1992-01-01

    Since its authorization by the U.S. Congress in Public Law 96-164, the Waste Isolation Pilot Plant Program has achieved significant progress. Subsequent to a Record of Decision based on the October 1980 Final Environmental Impact Statement (FEIS), the scientific and engineering challenge of constructing a 100-acre mined repository to demonstrate the safe and environmentally sound disposal of defense program generated transuranic waste became reality. Since initial conception, however, a complex program has evolved. Demonstration of compliance with the requirements of the Resource Conservation and Recovery Act (RCRA) and Environmental Protection Agency (EPA) disposal Standards defined in 10 CFR 191, Subpart B (yet to be repromulgated), became prerequisites to a disposal decision. On June 13, 1990, based on a supplement to the 1980 FEIS, the decision was made to redefine the program to include a formal test phase. This decision required an addendum to the Final Safety Analysis Report to assure commitment to safety considerations, an intensive operational readiness review effort, and the need for a No-Migration Determination for the Environmental Protection Agency. In addition to meeting the technical challenges, the need to satisfy a broad spectrum of oversight groups (some directly funded by the Department of Energy) was required. With the decision making process publicly displayed on the Secretary of Energy's Decision Plan, the unprecedented challenges of the WIPP Program were painstakingly met, one by one, in an accountable and visible manner. (author)

  6. Startup Report for Ground Water Extraction, Treatment, and Recharge System

    National Research Council Canada - National Science Library

    Lamb, Steve

    1997-01-01

    The document presents startup procedures, observations and measurements conducted during the startup of the Groundwater Extraction, Treatment and Recharge System, built for the 162nd Fighter Wing, Air...

  7. Non-Solenoidal Startup Research Directions on the Pegasus Toroidal Experiment

    Science.gov (United States)

    Fonck, R. J.; Bongard, M. W.; Lewicki, B. T.; Reusch, J. A.; Winz, G. R.

    2017-10-01

    The Pegasus research program has been focused on developing a physical understanding and predictive models for non-solenoidal tokamak plasma startup using Local Helicity Injection (LHI). LHI employs strong localized electron currents injected along magnetic field lines in the plasma edge that relax through magnetic turbulence to form a tokamak-like plasma. Pending approval, the Pegasus program will address a broader, more comprehensive examination of non-solenoidal tokamak startup techniques. New capabilities may include: increasing the toroidal field to 0.6 T to support critical scaling tests to near-NSTX-U field levels; deploying internal plasma diagnostics; installing a coaxial helicity injection (CHI) capability in the upper divertor region; and deploying a modest (200-400 kW) electron cyclotron RF capability. These efforts will address scaling of relevant physics to higher BT, separate and comparative studies of helicity injection techniques, efficiency of handoff to consequent current sustainment techniques, and the use of ECH to synergistically improve the target plasma for consequent bootstrap and neutral beam current drive sustainment. This has an ultimate goal of validating techniques to produce a 1 MA target plasma in NSTX-U and beyond. Work supported by US DOE Grant DE-FG02-96ER54375.

  8. Pioneer Robot Testing Program and Status

    International Nuclear Information System (INIS)

    Herndon, J.N.

    2001-01-01

    The U.S. Department of Energy (USDOE) and Ukraine established a joint program in 1997 to address the need for remotely operated systems for unstructured environments in Ukraine such as the highly hazardous conditions inside the failed Chernobyl Nuclear Power Plant (ChNPP) Unit 4, or Shelter Object. The environment inside Shelter Object is extremely hazardous due to ionizing radiation fields, high airborne contamination, and major industrial safety issues. Although Ukrainian workers have explored and mapped much of the internals of Unit 4 in the time since the accident during the morning hours of April 26, 1986, there remain areas where humans have not entered to this date. Based on the agreement between USDOE and Ukraine, the USDOE, in cooperation with the U.S. National Aeronautics and Space Administration (NASA), developed the Pioneer Robot and has provided it to the ChNPP within the framework of international technical assistance. Pioneer is capable of mobile platform movement and manipulation under teleoperated control, 3-dimensional mapping, and environmental data collection. The Pioneer is radiation hardened for conditions like those of Shelter Object. Pioneer has been evaluated on site in Ukraine for use in both the Shelter Object environment and the more general conditions of ChNPP decommissioning. This paper summarizes the results of these testing activities and describes the status and near-term activities in support of the Pioneer Robot integration into Ukraine

  9. Niland Test Facility Startup Evaluation Task Force

    Energy Technology Data Exchange (ETDEWEB)

    1976-01-01

    The following team reports are included: systems, operation, control, and safety; instrumentation; brine chemistry and materials evaluation; reservoir assessment; environment; and contingency analysis. (MHR)

  10. Pinon Pine power project nears start-up

    Energy Technology Data Exchange (ETDEWEB)

    Tatar, G.A. [Sierra Pacific Power Co., Reno, NV (United States); Gonzalez, M. [Foster Wheeler USA Corp., Clinton, NJ (United States); Mathur, G.K. [M.W. Kellogg Co., Houston, TX (United States)

    1997-12-31

    The IGCC facility being built by Sierra Pacific Power Company (SPPCo) at their Tracy Station in Nevada is one of three IGCC facilities being cost-shared by the US Department of Energy (DOE) under their Clean Coal Technology Program. The specific technology to be demonstrated in SPPCo`s Round Four Project, known as the Pinon Pine IGCC Project, includes the KRW air blown pressurized fluidized bed gasification process with hot gas cleanup coupled with a combined cycle facility based on a new GE 6FA gas turbine. Construction of the 100 MW IGCC facility began in February 1995 and the first firing of the gas turbine occurred as scheduled on August 15, 1996 with natural gas. Mechanical completion of the gasifier and other outstanding work is due in January 1997. Following the startup of the plant, the project will enter a 42 month operating and testing period during which low sulfur western and high sulfur eastern or midwestern coals will be processed.

  11. Summary revaluation of energetic start-up of the unit 1 of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Sarvaic, I.; Miskolci, M.

    1998-01-01

    The document contents stage revaluation of energetic start-up of the unit 1 of nuclear power plant Mochovce. Test results of the stage of energetic start-up are summarized in the document, valuation of important systems and block devices as well as fulfilling the operation limits and conditions has been performed. On that base conclusions and recommendations for start-up the unit 2 and for commercial operation of the unit 1 are elaborated. The valuation has been elaborated by a scientific management for start-up nuclear power plant Mochovce of nuclear safety of nuclear power facilities. Scientific management for start-up of nuclear power plant Mochovce performed continuous valuation of individual power levels after ending of each individual level and it gave its valuation to energy power level with recommendations and conditions for further start-up process and operation. Scientific management finished its activity at the unit 1 of nuclear power plant Mochovce according to a statute of scientific management for start-up after successful completion of conclusive block run. Scientific management group was founded in February 1998 at nuclear power plant Mochovce. Its members are experts from Slovak, Czech, Russian and French organizations which are participating in power plant completion. Members are listed in a supplement No. 2

  12. Analysis of the start-up and control of a particle bed reactor

    International Nuclear Information System (INIS)

    Lazareth, O.W.; Araj, K.J.; Horn, F.L.; Ludewig, H.; Powell, J.R.

    1987-01-01

    This study describes the modeling of start-up transients in Particle Bed Reactors (PBR) for burst electric power. Two computer programs have been developed to analyze the start-up process. The first program (named KINETIC) analyzes the entire fuel element, calculating time dependent solutions for power and the temperature distribution in the packed bed. The second program (named SPHEAT, for Spherical Heating) calculates time-dependent temperatures inside individual, cladded fuel particles. The two programs provide powerful analytical tools for evaluation of material and geometrical options, power and time constraints, and conditions that could lead to element failures

  13. SBWR core thermal hydraulic analysis during startup

    International Nuclear Information System (INIS)

    Lin, J.H.; Huang, R.L.; Sawyer, C.D.

    1993-01-01

    This paper reports on a thermal hydraulic analysis of the SIMPLIFIED BOILING WATER REACTOR (SBWR) during startup. The potential instability during a SBWR startup has drawn the attention of designers, researchers, and engineers. It has not been a concern for a Boiling Water Reactor (BWR) with forced recirculation; however, for SBWR with natural circulation the concern exists. The concern is about the possibility of a geysering mode oscillation during SBWR startup from a cold temperature and a low system pressure with a low natural circulation flow rate. A thermal hydraulic analysis of the SBWR is performed in simulation of the startup using the TRACG computer code. The temperature, pressure, and reactor power profiles of SBWR during the startup are presented. The results are compared with the data of a natural circulation boiling water reactor, the DODEWAARD plant, in which no instabilities have been observed during many startups. It is shown that a SBWR startup which follows proper procedures, geysering and other modes of oscillations can be avoided

  14. Progress of the Hanford Bulk Vitrification Project ICVTM Testing Program

    International Nuclear Information System (INIS)

    Witwer, K.S.; Woolery, D.W.; Dysland, E.J.

    2006-01-01

    In June 2004, the Bulk Vitrification Project was initiated with the intent to engineer, construct and operate a full-scale bulk vitrification pilot-plant to treat low-activity tank waste from Hanford tank 241-S-109. The project, managed by CH2M HILL Hanford Group, Inc., and performed by AMEC Earth and Environmental, Inc. (AMEC), will develop and operate a full-scale demonstration facility to exhibit the effectiveness of the bulk vitrification process under actual operating conditions. Since project initiation, testing has been undertaken using crucible-scale, 1/6 linear (engineering) scale, and full-scale vitrification equipment. Crucible-scale testing, coupled with engineering-scale testing, helps establish process limitations of selected glass formulations. Full-scale testing provides critical design verification of the In Container Vitrification (ICV) TM process both prior to and during operation of the demonstration facility. Beginning in late 2004, several full-scale tests have been performed at AMEC's test site, located adjacent to the U.S. Department of Energy's Hanford Site, in Richland, WA. Early testing involved verification of melt startup methodology, followed by subsequent full-melt testing to validate critical design parameters and demonstrate the 'Bottom-Up, Feed While Melt' process. As testing has progressed, design improvements have been identified and incorporated into each successive test. Full scale testing at AMEC's test site is currently scheduled to complete in 2006, with continued full-scale operational testing at the demonstration facility on the Hanford Site starting in 2007. Additional engineering scale testing will validate recommended glass formulations that have been provided by the Pacific Northwest National Laboratory (PNNL). This testing is expected to continue through 2006. This paper discusses the progress of the full-scale and engineering scale testing performed to date. Crucible-scale testing, a critical step in developing

  15. Market Channels of Technology Startups that Internationalize Rapidly from Inception

    Directory of Open Access Journals (Sweden)

    Simar Yoos

    2012-10-01

    Full Text Available The study of technology startups that internationalize rapidly from inception has increased in recent years. However, little is known about their channels to market. This article addresses a gap in the "born global" literature by examining the channels used by six startups that internationalized rapidly from inception as well as the programs they used to support their channel partners and customers. The six startups examined combined the use of the Internet with: i a relationship with a multi-national, ii distributors, iii re-sellers, or iv a direct sales force. They also delivered programs to support partners and customers that focused on communications, alliance and network development, education, marketing and promotion, and financial incentives. This article informs entrepreneurs who need to design go-to-market channels to exploit global opportunities about decisions made by other entrepreneurs who launched born-global companies. Normative rules and practitioner-oriented approaches are needed to help entrepreneurs explain and apply the results presented in this article.

  16. Entrepreneurial patent management in pharmaceutical startups.

    Science.gov (United States)

    Holgersson, Marcus; Phan, Tai; Hedner, Thomas

    2016-07-01

    Startups fill an increasingly important role as innovators in the pharmaceutical industry, and patenting is typically central to their success. This article aims to explore patent management in pharmaceutical startups. The results show that startups need to deal with several challenges related to patenting and an 'entrepreneurial' approach to patent management is called for. Resource constraints, venture capital provision, exits and other conditions and events must be readily considered in the patent management process to build a successful pharmaceutical venture, something that could benefit the pharmaceutical industry as a whole. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Using Virtual ATE Model to Migrate Test Programs

    Institute of Scientific and Technical Information of China (English)

    王晓明; 杨乔林

    1995-01-01

    Bacause of high development costs of IC (Integrated Circuit)test programs,recycling existing test programs from one kind of ATE (Automatic Test Equipment) to another or generating directly from CAD simulation modules to ATE is more and more valuable.In this paper,a new approach to migrating test programs is presented.A virtual ATE model based on object-oriented paradigm is developed;it runs Test C++ (an intermediate test control language) programs and TeIF(Test Inftermediate Format-an intermediate pattern),migrates test programs among three kinds of ATE (Ando DIC8032,Schlumberger S15 and GenRad 1732) and generates test patterns from two kinds of CAD 9Daisy and Panda) automatically.

  18. Alternative filtration testing program: Pre-evaluation of test results

    International Nuclear Information System (INIS)

    Georgeton, G.K.; Poirier, M.R.

    1990-01-01

    Based on results of testing eight solids removal technologies and one pretreatment option, it is recommended that a centrifugal ultrafilter and polymeric ultrafilter undergo further testing as possible alternatives to the Norton Ceramic filters. Deep bed filtration should be considered as a third alternative, if a backwashable cartridge filter is shown to be inefficient in separate testing

  19. Alternative filtration testing program: Pre-evaluation of test results

    Energy Technology Data Exchange (ETDEWEB)

    Georgeton, G.K.; Poirier, M.R.

    1990-09-28

    Based on results of testing eight solids removal technologies and one pretreatment option, it is recommended that a centrifugal ultrafilter and polymeric ultrafilter undergo further testing as possible alternatives to the Norton Ceramic filters. Deep bed filtration should be considered as a third alternative, if a backwashable cartridge filter is shown to be inefficient in separate testing.

  20. Program for analyzing power boost tests

    International Nuclear Information System (INIS)

    Wills, C.A.

    1982-03-01

    A rapid increase of power in a reactor produces a failure in the fuel. Experiments to study the conditions in the NRU reactor after such failures have been planned and carried out. Given the concentrations of specified isotopes at a number of times over the length of an experiment as produced for example, from the program SARGS and the power history of the reactor, this program calculates the release rates, escape rate coefficients, and fractional releases for the isotopes. These values may be optionally printed and plotted. Decay schemes for a limited number of mass numbers are implemented. The program is written in FORTRAN and runs on the CDC 6600 - CYBER 170 system

  1. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    Science.gov (United States)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  2. Lean Start-up in Established Companies

    DEFF Research Database (Denmark)

    Goduscheit, René Chester

    2018-01-01

    Lean start-up is an emergent perspective on how entrepreneurs can bring new products and services to the market. This approach challenges the dominant role of lengthy business plans, linear product development processes, and seeking complete overview of the potential of the new products....../services before market launch. Instead it suggests that start-ups could benefit from a ‘minimum-viable product’ approach where products and services are launched when they contain critical features. The emphasis in the lean start-up approach is on business models rather than the elaborate business plan...... at the companies (strategy meetings, development workshops etc.). The aim is to shed light on the implications for companies that seek to employ lean start-up. These implications will be aimed at aspects like innovation management, organizational structure, customer relations etc....

  3. Progeria Research Foundation Diagnostic Testing Program

    Science.gov (United States)

    ... Share the DVD Meet the Kids in the Movie Bring LATS to the classroom! Close News/Events ... this could severely affect their research results and interpretation. Through the PRF Diagnostics Program, each cell line ...

  4. Towards a Theory for Testing Non-terminating Programs

    DEFF Research Database (Denmark)

    Gotlieb, Arnaud; Petit, Matthieu

    2009-01-01

    Non-terminating programs are programs that legally perform unbounded computations. Though they are ubiquitous in real-world applications, testing these programs requires new theoretic developments as usual definitions of test data adequacy criteria ignore infinite paths. This paper develops...... a theory of program-based structural testing based on operational semantics. Reasoning at the program semantics level permits to cope with infinite paths (and non-feasible paths) when defining test data adequacy criteria. As a result, our criteria respect the first Weyuker’s property on finite...... applicability, even for non-terminating programs. We discuss the consequences of this re-interpretation of test data adequacy criteria w.r.t. existing test coverage criteria....

  5. Is there a lean future for global startups?

    DEFF Research Database (Denmark)

    Tanev, Stoyan

    2017-01-01

    This article integrates insights from the latest research on the lean startup entrepreneurial method, born-global firms, and global startups. It contributes to the clarification of terminology referring to the global aspects of startups, summarizes insights from previous literature focusing on gl......-based global startup research and practice. The analysis should benefit both researchers and practitioners in technology entrepreneurship, international entrepreneurship, and global innovation management.......This article integrates insights from the latest research on the lean startup entrepreneurial method, born-global firms, and global startups. It contributes to the clarification of terminology referring to the global aspects of startups, summarizes insights from previous literature focusing...... on global startups, and further substantiates the articulation of the need for considering the lean global startup as a new type of firm. The main message is that the lessons learned from the emergence of lean startup entrepreneurship offer a basis for promoting a similar lean phase in technology...

  6. Test plan: Potash Core Test. WIPP experimental program borehole plugging

    International Nuclear Information System (INIS)

    Christensen, C.L.

    1979-09-01

    The Potash Core Test will utilize a WIPP emplaced plug to obtain samples of an in-situ cured plug of known mix constituents for bench scale testing. An earlier effort involved recovery at the salt horizon of Plug 217, a 17 year old plug in a potash exploration hole for bond testing, but the lack of particulars in the emplacement precluded significant determination of plug performance

  7. On the startup and shutdown of a tandem mirror reactor

    International Nuclear Information System (INIS)

    Chang, F.R.; DeCanio, F.T.; Fisher, J.L.; Madden, P.A.

    1979-01-01

    The startup and shutdown of a fusion reactor must be performed in such a way that the plasma remains MHD stable. In a tandem mirror the stability depends on a sufficiently high pressure ratio between the plugs and the central cell, of the order of 100. Control of the neutral beam input to the plugs by means of active feedback has been investigated to achieve an acceptable pressure ratio throughout the entire startup/shutdown transient. An algorithm to control the beam input power has been developed. The control law was subsequently tested in a tandem mirror simulation code. This paper describes the basic models incorporated in the simulation, as well as the derivation of the control algorithm. The simulation results are presented and the practicality of implementing the algorithm is discussed. 4 refs

  8. Simulation of SBWR startup transient and stability

    International Nuclear Information System (INIS)

    Cheng, H.S.; Khan, H.J.; Rohatgi, U.S.

    1998-01-01

    The Simplified Boiling Water Reactor (SBWR) designed by General Electric is a natural circulation reactor with enhanced safety features for potential accidents. It has a strong coupling between power and flow in the reactor core, hence the neutronic coupling with thermal-hydraulics is specially important. The potential geysering instability during the early part of a SBWR startup at low flow, low power and low pressure is of particular concern. The RAMONA-4B computer code developed at Brookhaven National Laboratory (BNL) for the SBWR has been used to simulate a SBWR startup transient and evaluate its stability, using a simplified four-channel representation of the reactor core for the thermal-hydraulics. This transient was run for 20,000 sec (5.56 hrs) in order to cover the essential aspect of the SBWR startup. The simulation showed that the SBWR startup was a very challenging event to analyze as it required accurate modeling of the thermal-hydraulics at low pressures. This analysis did not show any geysering instability during the startup, following the startup procedure as proposed by GE

  9. Neutron flux monitoring with pre-startup channels in FBTR [Paper No.:E6

    International Nuclear Information System (INIS)

    Nagaraj, C.P.; Ramakrishnan, R.; Subha Rao, R.; Pillai, C.P.; Muralikrishan, G.; Raghavan, K.

    1993-01-01

    The pre-start up instrumentation system using boron lined proportional counters has been well designed and the counters have been rigorously tested. This system in conjunction with the regular start-up channels (with more than 3 decades overlap) covers the start up measurement range adequately and provides necessary indications, interlocks and trips on low count rate, high count rate and doubling time to ensure safety. The pre-startup channels have been operational. The reactor trip on LOG NO due to count rate on start-up channels less than 3 cps is automatically inhibited with the higher count rate obtained on the pre-startup channels. With this and log CRM readings from PSU well on scale has facilitated smooth and safe reactor start ups even with low shutdown count rates. (author). 5 figs

  10. Aeroelastic Modeling of a Nozzle Startup Transient

    Science.gov (United States)

    Wang, Ten-See; Zhao, Xiang; Zhang, Sijun; Chen, Yen-Sen

    2014-01-01

    Lateral nozzle forces are known to cause severe structural damage to any new rocket engine in development during test. While three-dimensional, transient, turbulent, chemically reacting computational fluid dynamics methodology has been demonstrated to capture major side load physics with rigid nozzles, hot-fire tests often show nozzle structure deformation during major side load events, leading to structural damages if structural strengthening measures were not taken. The modeling picture is incomplete without the capability to address the two-way responses between the structure and fluid. The objective of this study is to develop a tightly coupled aeroelastic modeling algorithm by implementing the necessary structural dynamics component into an anchored computational fluid dynamics methodology. The computational fluid dynamics component is based on an unstructured-grid, pressure-based computational fluid dynamics formulation, while the computational structural dynamics component is developed under the framework of modal analysis. Transient aeroelastic nozzle startup analyses at sea level were performed, and the computed transient nozzle fluid-structure interaction physics presented,

  11. CIT photoheliograph functional verification unit test program

    Science.gov (United States)

    1973-01-01

    Tests of the 2/3-meter photoheliograph functional verification unit FVU were performed with the FVU installed in its Big Bear Solar Observatory vacuum chamber. Interferometric tests were run both in Newtonian (f/3.85) and Gregorian (f/50) configurations. Tests were run in both configurations with optical axis horizontal, vertical, and at 45 deg to attempt to determine any gravity effects on the system. Gravity effects, if present, were masked by scatter in the data associated with the system wavefront error of 0.16 lambda rms ( = 6328A) apparently due to problems in the primary mirror. Tests showed that the redesigned secondary mirror assembly works well.

  12. The UKAEA mechanical test programs in air

    International Nuclear Information System (INIS)

    Wood, D.S.

    1977-01-01

    The design of CDFR will be based on the mechanical behaviour of materials in air, although at a later date account may need to be taken of sodium effects. The need for this Information is outlined in the introductory paper. The extent of the air programs and preliminary findings are described in this paper

  13. The UKAEA mechanical test programs in air

    Energy Technology Data Exchange (ETDEWEB)

    Wood, D S [UKAEA, RNPDL, Risley (United Kingdom)

    1977-07-01

    The design of CDFR will be based on the mechanical behaviour of materials in air, although at a later date account may need to be taken of sodium effects. The need for this Information is outlined in the introductory paper. The extent of the air programs and preliminary findings are described in this paper.

  14. Test of user- and system programs coded in real time languages - requirements on program language and testing tool

    International Nuclear Information System (INIS)

    Hertlin, J.; Mackert, M.

    1979-01-01

    In the present paper the functions are presented, which should be part of a test system for user programs in a higher treat time programming language, taking into account time sequences and competitive processes. As can be shown by the problem of testing, use of higher level real time programming languages renders the task of program development essentially easier, however performance of test procedures without appropriate test systems is very difficult. After the presentation of notions and methods for the testing of programs, general requirements on testing tools are described and the test system functions for a program test, beeing uncritical with respect to time, are placed together. Thereby, for every individual function, the interface between the test system, the program under test, and the residual program-generation system (compiler, binder, operating system, delay-time system, and loader) is given too. For the time-critical test, a series of desirable functions are described, which can be implemented with acceptable expense. (orig.) [de

  15. The process of the start-up of a PWR nuclear power plant in the USA

    International Nuclear Information System (INIS)

    Rana, B.S.

    1977-01-01

    The procedure is described of putting into full operation the William B. Mc Guire nuclear power plant with two PWR reactors with an output of 2x3,411 MWt (2x1,220 MWe) supplied to the Duke Power Co. lock, stock and barrel. The basic specifications are shown of units I and II and the organization of start-up activities is described. The time schedule of preoperational and start-up tests is shown and testing is reviewed preceding the first fuel charge. Also described are tests related to the first start-up of a unit comprising the period of the first fuel charge, the initial critical state, low-power tests and tests with power gradually increased. In tests of the individual systems and components of the unit, operating regulations are verified and, if required, renewed, or new regulations are introduced. (B.S.)

  16. Robotic surgery start-up with a fellow as the console surgeon

    DEFF Research Database (Denmark)

    Reinhardt, Susanne; Ifaoui, Inge Boetker; Thorup, Jorgen

    2017-01-01

    learning curve for robotic pyeloplasty will allow pediatric urology fellowship programs to be integrated in the start-up phase of a pediatric robotic program even though the case material is limited. Operative success rates were in accordance with the gold standard of open surgery....

  17. Blood-alcohol proficiency test program

    Science.gov (United States)

    1975-01-01

    A preliminary survey has been performed to ascertain the validity of the blood alcohol analysis performed by a number of laboratories on a voluntary basis. Values of accuracy and precision of the tests are presented. /Abstract from report summary pag...

  18. BWR startup and shutdown activity transport control

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, S.E., E-mail: sgarcia@epri.com [Electric Power Research Inst. (EPRI), Palo Alto, California (United States); Giannelli, J.F.; Jarvis, A.J., E-mail: jgiannelli@finetech.com, E-mail: ajarvis@finetech.com [Finetech, Inc., Parsippany, New Jersey (United States)

    2010-07-01

    This paper summarizes BWR industry experience on good practices for controlling the transport of corrosion product activity during shutdowns, particularly refueling outages, and for startup chemistry control to minimize IGSCC (intergranular stress corrosion cracking). For shutdown, overall goals are to minimize adverse impacts of crud bursts and the time required to remove activated corrosion products from the reactor coolant during the shutdown process prior to refueling, and to assist plants in predicting and controlling radiation exposure during outages. For startup, the overall goals are to highlight conditions during early heatup and startup when sources of reactor coolant oxidants are high, when there is a greater likelihood for chemical excursions associated with refueling outage work activities, and when hydrogen injection is not available to mitigate IGSCC due to system design limitations. BWR water chemistry has changed significantly in recent years with the adoption of hydrogen water chemistry, zinc addition and noble metal chemical applications. These processes have, in some instances, resulted in significant activity increases during shutdown evolutions, which together with reduced time for cleanup because of shorter outages, has consequently increased outage radiation exposure. A review several recent outages shows that adverse effects from these conditions can be minimized, leading to the set of good practice recommendations for shutdown chemistry control. Most plants lose the majority of their hydrogen availability hours during early startup because feedwater hydrogen injection systems were not originally designed to inject hydrogen below 20% power. Hydrogen availability has improved through modifications to inject hydrogen at lower power levels, some near 5%. However, data indicate that IGSCC is accelerated during early startup, when dissolved oxygen and hydrogen peroxide levels are high and reactor coolant temperatures are in the 300 to 400 {sup o

  19. Accelerated Leach Test(s) Program: Annual report

    International Nuclear Information System (INIS)

    Dougherty, D.R.; Pietrzak, R.F.; Fuhrmann, M.; Colombo, P.

    1986-09-01

    A computerized data base of LLW leaching data has been developed. Long-term tests on portland cement, bitumen and vinyl ester-styrene (VES) polymer waste forms containing simulated wastes are underway which are designed to identify and evaluate factors that accelerate leaching without changing the mechanisms

  20. SP-100 initial startup and restart control strategy

    International Nuclear Information System (INIS)

    Halfen, F.J.; Wong, K.K.; Switick, D.M.; Shukla, J.N.

    1992-01-01

    This paper reports that recent Generic Flight System (GFS) updates have necessitated revisions in the initial startup and restart control strategies. The design changes that have had the most impact on the control strategies are the addition of the Auxiliary Cooling and Thaw (ACT) system for preheating the lithium filled components, changes in the reactivity worths of the reflectors and safety-rods such that initial cold criticality is achieved with only a small amount of reflector movement following the withdrawal of the safety-rods, and the removal of the scram function from the reflectors. Revised control and operating strategies have been developed and tested using the SP-100 dynamic simulation model, ARIES-GFS. The change in the total reactivity worths of the reflectors and safety-rods has eliminated the need for the use of fast and slow reflector drive speeds during the initial on-orbit approach to criticality. The relatively fast removal of the safety-rods results in a near-critical condition so that the use of slow moving (single speed) reflector drives does not add significant time to achieve full power for the initial startup. The use of the ACT system (with its NaK trace-lines for preheating and auxiliary cooling) affects the main Thermoelectric Electro-Magnetic (TEM) pump startup and the time after a shutdown before freezing occurs in the main heat transfer systems

  1. Testing experience with fast flux test facility

    International Nuclear Information System (INIS)

    Noordhoff, B.H.; McGough, C.B.; Nolan, J.E.

    1975-01-01

    Early FFTF project planning emphasized partial and full-scale testing of major reactor and plant prototype components under expected environmental conditions, excluding radiation fields. Confirmation of component performance during FFTF service was considered essential before actual FFTF startup, to provide increased assurance against FFTF startup delays or operational difficulties and downtime. Several new sodium facilities were constructed, and confirmation tests on the prototype components are now in progress. Test conditions and results to date are reported for the primary pump, intermediate heat exchanger, sodium-to-air dump heat exchanger, large and small sodium valves, purification cold trap, in-vessel handling machine, instrument tree, core restraint, control rod system, low-level flux monitor, closed loop ex-vessel machine, refueling equipment, and selected maintenance equipment. The significance and contribution of these tests to the FFTF and Liquid Metal Fast Breeder Reactor (LMFBR) program are summarized. (U.S.)

  2. A Reload and Startup Plan for and #8233;Conversion of the NIST Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Diamond, D. J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Varuttamaseni, A. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The National Institute of Standards and Technology operates a 20 MW research reactor for neutron-based research. The heavy-water moderated and cooled reactor is fueled with high-enriched uranium (HEU) but a program to convert the reactor to low-enriched uranium (LEU) fuel is underway. Among other requirements, a reload and startup test plan must be submitted to the U.S. Nuclear Regulatory Commission (NRC) for their approval. The NRC provides guidance for what should be in the plan to ensure that the licensee has sufficient information to operate the reactor safely. Hence, a plan has been generated consisting of two parts.The reload portion of the plan specifies the fuel management whereby initially only two LEU fuel elements are in the core for eight fuel cycles. This is repeated until a point when the optimum approach is to place four fresh LEU elements into the reactor each cycle. This final transition is repeated and after eight cycles the reactor is completely fueled with LEU. By only adding two LEU fuel elements initially, the plan allows for the consumption of HEU fuel elements that are expected to be in storage at the time of conversion and provides additional qualification of production LEU fuel under actual operating conditions. Because the reload is to take place over many fuel cycles, startup tests will be done at different stages of the conversion. The tests, to be compared with calculations to show that the reactor will operate as planned, are the measurement of critical shim arm position and shim arm and regulating rod reactivity worths. An acceptance criterion for each test is specified based on technical specifications that relate to safe operation. Additional tests are being considered that have less safety significance but may be of interest to bolster the validation of analysis tools.

  3. A reload and startup plan for conversion of the NIST research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Diamond, D. J. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2016-03-31

    The National Institute of Standards and Technology operates a 20 MW research reactor for neutron-based research. The heavy-water moderated and cooled reactor is fueled with high-enriched uranium (HEU) but a program to convert the reactor to low-enriched uranium (LEU) fuel is underway. Among other requirements, a reload and startup test plan must be submitted to the U.S. Nuclear Regulatory Commission (NRC) for their approval. The NRC provides guidance for what should be in the plan to ensure that the licensee has sufficient information to operate the reactor safely. Hence, a plan has been generated consisting of two parts. The reload portion of the plan specifies the fuel management whereby initially only two LEU fuel elements are in the core for eight fuel cycles. This is repeated until a point when the optimum approach is to place four fresh LEU elements into the reactor each cycle. This final transition is repeated and after eight cycles the reactor is completely fueled with LEU. By only adding two LEU fuel elements initially, the plan allows for the consumption of HEU fuel elements that are expected to be in storage at the time of conversion and provides additional qualification of production LEU fuel under actual operating conditions. Because the reload is to take place over many fuel cycles, startup tests will be done at different stages of the conversion. The tests, to be compared with calculations to show that the reactor will operate as planned, are the measurement of critical shim arm position and shim arm and regulating rod reactivity worths. An acceptance criterion for each test is specified based on technical specifications that relate to safe operation. Additional tests are being considered that have less safety significance but may be of interest to bolster the validation of analysis tools.

  4. Helping Students Test Programs That Have Graphical User Interfaces

    Directory of Open Access Journals (Sweden)

    Matthew Thornton

    2008-08-01

    Full Text Available Within computer science education, many educators are incorporating software testing activities into regular programming assignments. Tools like JUnit and its relatives make software testing tasks much easier, bringing them into the realm of even introductory students. At the same time, many introductory programming courses are now including graphical interfaces as part of student assignments to improve student interest and engagement. Unfortunately, writing software tests for programs that have significant graphical user interfaces is beyond the skills of typical students (and many educators. This paper presents initial work at combining educationally oriented and open-source tools to create an infrastructure for writing tests for Java programs that have graphical user interfaces. Critically, these tools are intended to be appropriate for introductory (CS1/CS2 student use, and to dovetail with current teaching approaches that incorporate software testing in programming assignments. We also include in our findings our proposed approach to evaluating our techniques.

  5. Tested program for Third World economic development

    Energy Technology Data Exchange (ETDEWEB)

    Lindholm, R.W.

    1977-04-01

    Some of the responsibility for the inability of Western-oriented Third World Countries (1) to make democratic economic institutions work rests upon advisers to American and international financial institutions who recommend principles of economic growth distilled out of Keynesian recipes for an over-saving Western society of the 1930s, and out of aspects of American experience with no applicability elsewhere. Applicable aspects of U.S. experience suggest a program relying on capitalistic drives and using fiscal and monetary policy of the type that proved useful in the development of democratic capitalism in the U.S. in the 19th century.

  6. Interdisciplinarity in Tech Startups Development – Case Study of ‘Unistartapp’ Project

    Directory of Open Access Journals (Sweden)

    Kopera Sebastian

    2018-03-01

    Full Text Available Empirical data as well as scientific reports confirm that startups require diverse, in-house competencies in order to achieve market success. However, while technology-related competencies are usually brought to new tech ventures by their founders, there is a significant deficiency of market- and management-related competencies, which is reflected in the statistics of common startup failure reasons. In this context, a question arises: how interdisciplinarity of knowledge and competencies can be built into the very core of tech startups? The text addresses this question by zeroing in on the role of universities in this process. In the first part, the specificity of tech startups is analyzed. The next chapter overviews the hitherto academy-related startup education environment together with its shortcomings as far as interdisciplinarity is concerned. Finally, the case study of innovative and interdisciplinary academic ecosystem, which was built and tested within the project UniStartApp, is presented and discussed together with related lessons learned. The text is concluded with final remarks on challenges involved in embedding interdisciplinarity into startup education ecosystem.

  7. Biosphere 2 test module experimentation program

    Science.gov (United States)

    Alling, Abigail; Leigh, Linda S.; Maccallum, Taber; Alvarez-Romo, Norberto

    1990-01-01

    The Biosphere 2 Test Module is a facility which has the capability to do either short or long term closures: five month closures with plants were conducted. Also conducted were investigations of specific problems, such as trace gas purification by bioregenerative systems by in-putting a fixed concentration of a gas and observing its uptake over time. In other Test Module experiments, the concentration of one gas was changed to observe what effects this has on other gases present or on the system. The science of biospherics which encompasses the study of closed biological systems provides an opening into the future in space as well as in the Earth's biosphere.

  8. TRAINING OF INNOVATIVE ENTREPRENEURSHIP – A KEY TO CREATION OF STARTUPS

    Directory of Open Access Journals (Sweden)

    Olena KURCHENKO

    2016-07-01

    Full Text Available Innovative startup companies that emerged in the late 1990s are now widely supported by countries with developed innovation systems. The aim of this article is to analyse the experience of creation innovative programs in entrepreneurship, with a further perspective for introducing similar programmes into Ukrainian universities. For this, the authors presented their own developed program of monitoring the Ukrainian universities on availability of courses of innovative entrepreneurship. The results of this survey will be analytical prerequisite for decision-making of establishment special curriculum of innovative entrepreneurship in technical and natural Sciences universities for the development of startup-ecosystem in Ukraine.

  9. PBF/LOFT Lead Rod Test Program experiment predictions document

    International Nuclear Information System (INIS)

    Varacalle, D.J.; Cox, W.R.; Niebruegge, D.A.; Seiber, S.J.; Brake, T.E.; Driskell, W.E.; Nigg, D.W.; Tolman, E.L.

    1978-12-01

    The PBF/LOFT Lead Rod (LLR) Test Program is being conducted to provide experimental information on the behavior of nuclear fuel under normal and accident conditions in the Power Burst Facility (PBF) at the Idaho National Engineering Laboratory. The PBF/LLR tests are designed to simulate the test conditions for the LOFT Power Ascension Tests L2-3 through L2-5. The test program has been designed to provide a parametric evaluation of the LOFT fuel (center and peripheral modules) over a wide range of power. This report presents the experiment predictions for the three four-rod LOCA tests

  10. Next Generation Drivetrain Development and Test Program

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan; Erdman, Bill; Blodgett, Doug; Halse, Chris; Grider, Dave

    2015-11-03

    This presentation was given at the Wind Energy IQ conference in Bremen, Germany, November 30 through December 2, 2105. It focused on the next-generation drivetrain architecture and drivetrain technology development and testing (including gearbox and inverter software and medium-voltage inverter modules.

  11. Validating High-Stakes Testing Programs.

    Science.gov (United States)

    Kane, Michael

    2002-01-01

    Makes the point that the interpretations and use of high-stakes test scores rely on policy assumptions about what should be taught and the content standards and performance standards that should be applied. The assumptions built into an assessment need to be subjected to scrutiny and criticism if a strong case is to be made for the validity of the…

  12. Guidelines for e-Startup Promotion Strategy

    Directory of Open Access Journals (Sweden)

    Valerio De Simone

    2015-04-01

    Full Text Available Abstract Startup businesses have always played an important role in the global economy, but recently their importance has grown significantly. For this reason, governments around the world have amended regulation and created incentives to encourage their development. However, statistics show that startups have an extremely high mortality rate, often due to a lack of strategic planning, wrong marketing investments or inefficient resource allocation. The purpose of this paper is to propose a decision-driven tool which will enable the creation of a successful promotional strategy. The proposed strategy is a three-stage process allowing startups to gradually eliminate non-optimal advertising formats. The first stage focuses on the analysis of the e-market where the startup operates. The second stage is dedicated to the economic environment that the new company will face relative to its available resources. Its aim is to reject overly expensive advertising formats by linking costs to availability of funds. The third and last stage is a cost effectiveness analysis, allowing the entrepreneur to identify the best advertising formats and using an impact-factor as a proxy of effectiveness. The proposed methodology has been applied to the case of an Italian early-stage startup for validation.

  13. Test results of Nb3Sn ribbons for the Princeton D coil test program

    International Nuclear Information System (INIS)

    Kaugerts, J.; File, J.; Willard, J.W.

    1974-10-01

    A previously described D coil test program was modified. Details of a smaller Nb 3 Sn D coil test program are described. Cusp coil tests were made with several Nb 3 Sn composite ribbons. Measurements of both the quench and recovery currents as a function of magnetic field component perpendicular to the wide edge of the ribbon are presented. (auth)

  14. Collider Dipole Magnet test program from development through production

    International Nuclear Information System (INIS)

    Bailey, R.E.

    1991-01-01

    Verification of CDM performance, reliability, and magnet production processes will be accomplished during the development phase of the program. Key features of this program include thorough in process testing of magnet subassemblies, verification of the magnetic field quality, and demonstration of the CDM performance during the formal qualification program. Reliability demonstration of the CDM design includes component tests and an accelerated life test program. Prototype magnet phase will address achievement of magnet performance goals through a program of fabrications, test, analysis, redesign as required and procurement of modified parts for a second fabrication run. This process would be repeated again if necessary, and would conclude with a final design for the production magnets. Production process validation will address the effects that key production processes have upon magnet performance, using the magnets produced during the Preproduction phase

  15. Tritium Systems Test Assembly operator training program

    International Nuclear Information System (INIS)

    Kerstiens, F.L.

    1985-01-01

    Proper operator training is needed to help ensure the safe operation of fusion facilities by personnel who are qualified to carry out their assigned responsibilities. Operators control and monitor the Tritium Systems Test Assembly (TSTA) during normal, emergency, and maintenance phases. Their performance is critical both to operational safety, assuring no release of tritium to the atmosphere, and to the successful simulation of the fusion reaction progress. Through proper training we are helping assure that TSTA facility operators perform their assignments in a safe and efficient manner and that the operators maintain high levels of operational proficiency through continuing training, retraining, requalification, and recertification

  16. Start-up of anaerobic digestion of source-sorted organic municipal solid waste

    International Nuclear Information System (INIS)

    Maroun, Rania

    2004-01-01

    Municipal solid waste (MSW) disposal is a major environmental concern worldwide. Among the environmentally sound technologies for the treatment of MSW, composting in the form of anaerobic digestion (AD) appears as a suitable alternative that offers the advantage of rapid stabilization of organic matter, reduction in waste volume, production of methane, and minimal environmental impacts in comparison to land filling and incineration. Yet, although outstanding advances in anaerobic digestion of solid substrate have been made in the last 10 years, some development areas are lagging, including the fast and reliable process start-up in terms of type of inocula and overall start-up strategies. The present study investigates the start-up and operation of bench-scale anaerobic digesters treating the source-sorted organic fraction of municipal solid waste. The experimental program consisted of starting up two digesters in parallel. Three consecutive interventions in the start-up program were implemented to achieve steady state. Start-up was relatively slow indicating the seed obtained from an operating anaerobic wastewater treatment plant was not suitable. The use of cattle manure together with effluent dilution reduced the acclimation period (Author.)

  17. Research nuclear reactor start-up simulator

    International Nuclear Information System (INIS)

    Sofo Haro, M.; Cantero, P.

    2009-01-01

    This work presents the design and FPGA implementation of a research nuclear reactor start-up simulator. Its aim is to generate a set of signals that allow replacing the neutron detector for stimulated signals, to feed the measurement electronic of the start-up channels, to check its operation, together with the start-up security logic. The simulator presented can be configured on three independent channels and adjust the shape of the output pulses. Furthermore, each channel can be configured in 'rate' mode, where you can specify the growth rate of the pulse frequency in %/s. Result and details of the implementation on FPGA of the different functional blocks are given. (author)

  18. History of ground motion programs at the Nevada Test Site

    International Nuclear Information System (INIS)

    Banister, J.R.

    1984-01-01

    Some measurements were made in the atmospheric testing era, but the study of ground motion from nuclear tests became of wider interest after the instigation of underground testing. The ground motion generated by underground nuclear test has been investigated for a number of reasons including understanding basic phenomena, operational and safety concerns, yield determination, stimulation of earthquake concerns, and developing methods to aid in treaty verifications. This history of ground motion programs will include discussing early studies, high yield programs, Peaceful Nuclear Explosions tests, and some more recent developments. 6 references, 10 figures

  19. Implementation and start-up of a quality control program in ultrasonography. A multidisciplinary work; Implementacion y puesta en marcha de un programa de control de calidad en ecografia. Un trabajo multidisciplinar

    Energy Technology Data Exchange (ETDEWEB)

    Fuertes, T. M.; Fernandez Gonzalez, B.; Arguelles Garcia, B.

    2013-09-01

    The Department of Medical Physics and Radiation Protection, in collaboration with the Department of Radiodiagnostics of the Central University Hospital of Asturias, has developed and implemented a quality control program in B-mode and Doppler ultrasound. This paper presents the quality control protocol that has been developed and describes the phantoms used and the tests that have been carried out. We also present the results obtained after the program's first year of implementation and the conclusions drawn from the experience: the improvements that, in our view, the program has brought and the problems we have encountered. Close collaboration between radiologists and physicists is essential to optimize control conditions, which must match conditions found in clinical practice as accurately as possible. (Author)

  20. Testing program for concrete at temperatures to 8940K

    International Nuclear Information System (INIS)

    Naus, D.J.; Oland, C.B.; Robinson, G.C.

    1981-01-01

    A test program was conducted to define the variations in mechanical properties of a limestone aggregate concrete and a lightweight insulating concrete exposed to elevated temperatures. Four test series were conducted: (1) unconfined compression; (2) shear; (3) rebar bond; and (4) sustained loading (creep). Tests results are presented

  1. Justice downwind: America's atomic testing program in the 1950s

    International Nuclear Information System (INIS)

    Ball, H.

    1986-01-01

    Drawing on personal interviews, case histories, and the archives of the Atomic Energy Commission, Professor Ball discusses the American nuclear-testing program from 1951 to 1963, the impact of the testing on people living downwind from the Nevada Test Site, long-term effects of radiation exposure, and the clash between the ''downwinders'' and the government

  2. The Department of Energy's radon testing program

    International Nuclear Information System (INIS)

    Scott, H.L.; Dudney, C.S.; Wilson, D.L.; Gammage, R.B.

    1993-01-01

    The US Department of Energy recently completed an initial survey of indoor radon in its buildings in response to Public Law 100--551, the Indoor Radon Abatement Act of 1988. Other federal agencies have also conducted radon surveys. This paper presents an overview of the results from radon testing of several thousand buildings ranging from 100 m 2 to over 10,000 M 2 in size. In addition, we have examined results from groups of buildings, classified according to ventilation and usage characteristics. So far, there is no apparent difference among building classes. The paper also discusses our proposal for phased radon surveys. We suggest that first-phase results can be used to identify facilities with radon problems. In the second phase, we suggest measurements be made at a much higher sampling density at facilities with radon problems. The results of the second phase are expected to identify all buildings in need of mitigation

  3. Manipulator Comparative Testing Program: Final report

    International Nuclear Information System (INIS)

    Draper, J.V.; Handel, S.J.; Sundstrom, E.; Herndon, J.N; Fujita, Y.; Maeda, M.

    1987-02-01

    The manipulator systems tested included the Meidensha BILARM 83A, the Central Research Laboratories Model M-2, and the GCA PaR Systems Model 6000. Six manipulator and control mode combinations were evaluated: (1) the BILARM in master/slave mode without force reflection, (2) the BILARM in master/slave mode with force reflection, (3) the Model M-2 in master/slave mode without force reflection, (4) the Model M-2 in master/slave mode with force reflection, (5) the BILARM with switchbox controls, and (6) the PaR 6000 with switchbox controls. The experiments examined differences between master/slave systems with and without force reflection and differences between master/slave systems and switchbox-controlled systems. A fourth experiment examined the relative contributions of the remote viewing system and the manipulator system to the performance of remote handling tasks. Results of the experiments showed that operators using the Model M-2 in master/slave mode had significantly faster times to completion than operators using the BILARM in master/slave mode, with about the same error rate per trial. Operators were slower using the BILARM with force reflection than without it, and they committed more errors. There was no statistically significant difference between force-reflection and nonforce-reflection conditions for the M-2 manipulator for any of the performance criteria. Tasks and procedures used in this testing were not sensitive to differences within any single system. No inferences about the effect of force reflection on remote task performance should be made from these data. The two manipulator systems in switchbox mode had significantly slower times to completion than any system in master/slave mode, with approximately the same error rate per trial. There were no significant differences between the BILARM in switchbox mode and the PaR arm

  4. Briu: A Coffee Roasting Startup

    OpenAIRE

    Beck, Maximilian

    2015-01-01

    The purpose of this study is to examine the German coffee market and its appropriateness as a new market to enter for the startup Company Briu. The company has been continuously growing since its initial start. The Chilean Coffee startup has since then looked for new markets opportunities in Europe. Their favored market is Germany. The research conducted in this paper is supposed to reveal the market its suitability for the company its expansion. The following key areas are assessed in order ...

  5. The Lean and Global Start-up

    DEFF Research Database (Denmark)

    Tanev, Stoyan; Rasmussen, Erik Stavnsager

    For several decades researchers have studied start-up companies with a focus on international markets, suppliers and networks from their inception and on companies that are establishing new, agile business models. This has resulted in two streams of research: The Born Global and International New...... Ventures research and research with a focus on the Lean Start-up company. It is our intention in this paper to give a short presentation of the two research streams and show how they can be merged into one with a focus on newly established technology oriented firms that are lean and global from...

  6. PBF/LOFT Lead Rod Test Program experiment operating specification

    International Nuclear Information System (INIS)

    Varacalle, D.J. Jr.

    1978-11-01

    The PBF/LOFT Lead Rod (LLR) Test Program is being conducted to provide experimental information on the behavior of nuclear fuel under normal and accident conditions in the Power Burst Facility at the Idaho National Engineering Laboratory. Understanding the behavior of light-water reactors (LWR) under loss-of-coolant conditions is a major objective of the NRC Reactor Safety Research Program. The Loss of Fluid Test (LOFT) facility is the major testing facility to evaluate the systems response of an LWR over a wide range of Loss of Coolant Experment (LOCE) conditions. As such, the LOFT core is intended to be used for sequential LOCE tests provided no significant fuel rod failures occur. The PFB/LLR tests are designed to simulate the test conditions for the LOFT Power Ascension Tests L2-2 through L2-5. The test program has been designed to provide a parametric evaluation of the LOFT fuel over a wide range of power. Thus, a relatively accurate assessment of the state of the LOFT core after the completion of each subtest and the anticipated effect of the next test can be obtained by utilizing a combination of LLR test data and analytical predictions. Specifications for the test program are presented

  7. Testing the structure of a hydrological model using Genetic Programming

    Science.gov (United States)

    Selle, Benny; Muttil, Nitin

    2011-01-01

    SummaryGenetic Programming is able to systematically explore many alternative model structures of different complexity from available input and response data. We hypothesised that Genetic Programming can be used to test the structure of hydrological models and to identify dominant processes in hydrological systems. To test this, Genetic Programming was used to analyse a data set from a lysimeter experiment in southeastern Australia. The lysimeter experiment was conducted to quantify the deep percolation response under surface irrigated pasture to different soil types, watertable depths and water ponding times during surface irrigation. Using Genetic Programming, a simple model of deep percolation was recurrently evolved in multiple Genetic Programming runs. This simple and interpretable model supported the dominant process contributing to deep percolation represented in a conceptual model that was published earlier. Thus, this study shows that Genetic Programming can be used to evaluate the structure of hydrological models and to gain insight about the dominant processes in hydrological systems.

  8. CRIEPI test program for seismic isolation of the FBR

    International Nuclear Information System (INIS)

    Shiojiri, Hiroo

    1989-01-01

    This paper describes the Central Research Institute of Electric Power Industry's (CRIEPIs) seismic isolation program. The test and research program on seismic isolation was started in 1987 by CRIEPI under contract with the Ministry of International Trade and Industry (MITI) of Japan. It was intended to establish a technical basis for the application of seismic isolation to fast breeder reactors (FBRs). In this paper, some details of the program and results of the preliminary study are described

  9. Prototype steam generator test at SCTI/ETEC. Acoustic program test plan

    International Nuclear Information System (INIS)

    Greene, D.A.; Thiele, A.; Claytor, T.N.

    1981-10-01

    This document is an integrated test plan covering programs at General Electric (ARSD), Rockwell International (RI) and Argonne National Laboratory (CT). It provides an overview of the acoustic leak detection test program which will be completed in conjunction with the prototype LMFBR steam generator at the Energy Technology Engineering Laboratory. The steam generator is installed in the Sodium Components Test Installation (SCTI). Two acoustic detection systems will be used during the test program, a low frequency system developed by GE-ARSD (GAAD system) and a high frequency system developed by RI-AI (HALD system). These systems will be used to acquire data on background noise during the thermal-hydraulic test program. Injection devices were installed during fabrication of the prototype steam generator to provide localized noise sources in the active region of the tube bundle. These injectors will be operated during the steam generator test program, and it will be shown that they are detected by the acoustic systems

  10. Sheath insulator final test report, TFE Verification Program

    International Nuclear Information System (INIS)

    1994-07-01

    The sheath insulator in a thermionic cell has two functions. First, the sheath insulator must electrically isolate the collector form the outer containment sheath tube that is in contact with the reactor liquid metal coolant. Second, The sheath insulator must provide for high uniform thermal conductance between the collector and the reactor coolant to remove away waste heat. The goals of the sheath insulator test program were to demonstrate that suitable ceramic materials and fabrication processes were available, and to validate the performance of the sheath insulator for TFE-VP requirements. This report discusses the objectives of the test program, fabrication development, ex-reactor test program, in-reactor test program, and the insulator seal specifications

  11. Sheath insulator final test report, TFE Verification Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The sheath insulator in a thermionic cell has two functions. First, the sheath insulator must electrically isolate the collector form the outer containment sheath tube that is in contact with the reactor liquid metal coolant. Second, The sheath insulator must provide for high uniform thermal conductance between the collector and the reactor coolant to remove away waste heat. The goals of the sheath insulator test program were to demonstrate that suitable ceramic materials and fabrication processes were available, and to validate the performance of the sheath insulator for TFE-VP requirements. This report discusses the objectives of the test program, fabrication development, ex-reactor test program, in-reactor test program, and the insulator seal specifications.

  12. LWR aerosol containment experiments (LACE) program and initial test results

    International Nuclear Information System (INIS)

    Muhlestein, L.D.; Hilliard, R.K.; Bloom, G.R.; McCormack, J.D.; Rahn, F.J.

    1985-01-01

    The LWR aerosol containment experiments (LACE) program is described. The LACE program is being performed at the Hanford Engineer Development Laboratory (operated by Westinghouse Hanford Company) and the initial tests are sponsored by EPRI. The objectives of the LACE program are: to demonstrate, at large-scale, inherent radioactive aerosol retention behavior for postulated high consequence LWR accident situations; and to provide a data base to be used for aerosol behavior . Test results from the first phase of the LACE program are presented and discussed. Three large-scale scoping tests, simulating a containment bypass accident sequence, demonstrated the extent of agglomeration and deposition of aerosols occurring in the pipe pathway and vented auxiliary building under realistic accident conditions. Parameters varied during the scoping tests were aerosol type and steam condensation

  13. Simultaneous test construction by zero-one programming

    NARCIS (Netherlands)

    Boekkooi-Timminga, Ellen

    1986-01-01

    A method is described for simultaneous test construction using the Operations Research technique zero-one programming. The model for zero-one programming consists of two parts. The first contains the objective function that describes the aspect to be optimized. The second part contains the

  14. 76 FR 23914 - National Organic Program; Periodic Residue Testing

    Science.gov (United States)

    2011-04-29

    ... NOP. Residue testing plays an important role in organic certification by providing a means for... OFPA (7 U.S.C. 6503 through 6507) from creating certification programs to certify organic farms or... State organic certification program may contain additional requirements for the production and handling...

  15. NCAA Drug-Testing Program 2010-11

    Science.gov (United States)

    National Collegiate Athletic Association (NJ1), 2010

    2010-01-01

    The National Collegiate Athletic Association (NCAA) Drug-Testing Program was created to protect the health and safety of student-athletes and to ensure that no one participant might have an artificially induced advantage or be pressured to use chemical substances. This publication describes this program in the following chapters: (1) NCAA…

  16. Oil spill sorbents: Testing protocol and certification listing program

    International Nuclear Information System (INIS)

    Cooper, D.; Gausemel, I.

    1993-01-01

    Environment Canada's Emergencies Engineering Division is spearheading a program in conjunction with the Canadian General Standards Board that would see the development of a certification and listing program in addition to a national standard for the testing of sorbent materials. Funding for this program is provided by Environment Canada (EC), Canadian Coast Guard (CCG), Marine Spill Response Corporation (MSRC), US Coast Guard (USCG), and US Minerals Management Service (MMS). The test methods are based upon those defined by the American Society for Testing and Materials and previous test methods developed by Environment Canada for our series of reports entitled Selection Criteria and Laboratory Evaluation of Oil Spill Sorbents. This series, which was started in 1975, encompasses a number of commercially available oil spill sorbents tested with different petroleum products and hydrocarbon solvents. The testing program will categorize the sorbents according to their operating characteristics. The main categories are oil spills on water, oil spills on land, and industrial use. The characteristics to be evaluated with the new test protocols include initial and maximum sorption capacities, water pickup, buoyancy, reuse potential, retention profile, disintegration (material integrity), and ease of application and retrieval. In the near future are plans to incorporate changes to the test that would involve increasing the list of test liquids to encompass spills in an industrial setting, in addition to testing sorbent booms and addressing the disposal problem

  17. High Performance Computing Modernization Program Kerberos Throughput Test Report

    Science.gov (United States)

    2017-10-26

    Naval Research Laboratory Washington, DC 20375-5320 NRL/MR/5524--17-9751 High Performance Computing Modernization Program Kerberos Throughput Test ...NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 2. REPORT TYPE1. REPORT DATE (DD-MM-YYYY) 4. TITLE AND SUBTITLE 6. AUTHOR(S) 8. PERFORMING...PAGE 18. NUMBER OF PAGES 17. LIMITATION OF ABSTRACT High Performance Computing Modernization Program Kerberos Throughput Test Report Daniel G. Gdula* and

  18. NedWind 25 Blade Testing at NREL for the European Standards Measurement and Testing Program

    Energy Technology Data Exchange (ETDEWEB)

    Larwood, S.; Musial, W.; Freebury, G.; Beattie, A.G.

    2001-04-19

    In the mid-90s the European community initiated the Standards, Measurements, and Testing (SMT) program to harmonize testing and measurement procedures in several industries. Within the program, a project was carried out called the European Wind Turbine Testing Procedure Development. The second part of that project, called Blade Test Methods and Techniques, included the United States and was devised to help blade-testing laboratories harmonize their testing methods. This report provides the results of those tests conducted by the National Renewable Energy Laboratory.

  19. Testing Automation of Context-Oriented Programs Using Separation Logic

    Directory of Open Access Journals (Sweden)

    Mohamed A. El-Zawawy

    2014-01-01

    Full Text Available A new approach for programming that enables switching among contexts of commands during program execution is context-oriented programming (COP. This technique is more structured and modular than object-oriented and aspect-oriented programming and hence more flexible. For context-oriented programming, as implemented in COP languages such as ContextJ* and ContextL, this paper introduces accurate operational semantics. The language model of this paper uses Java concepts and is equipped with layer techniques for activation/deactivation of layer contexts. This paper also presents a logical system for COP programs. This logic is necessary for the automation of testing, developing, and validating of partial correctness specifications for COP programs and is an extension of separation logic. A mathematical soundness proof for the logical system against the proposed operational semantics is presented in the paper.

  20. SPSS and SAS programming for the testing of mediation models.

    Science.gov (United States)

    Dudley, William N; Benuzillo, Jose G; Carrico, Mineh S

    2004-01-01

    Mediation modeling can explain the nature of the relation among three or more variables. In addition, it can be used to show how a variable mediates the relation between levels of intervention and outcome. The Sobel test, developed in 1990, provides a statistical method for determining the influence of a mediator on an intervention or outcome. Although interactive Web-based and stand-alone methods exist for computing the Sobel test, SPSS and SAS programs that automatically run the required regression analyses and computations increase the accessibility of mediation modeling to nursing researchers. To illustrate the utility of the Sobel test and to make this programming available to the Nursing Research audience in both SAS and SPSS. The history, logic, and technical aspects of mediation testing are introduced. The syntax files sobel.sps and sobel.sas, created to automate the computation of the regression analysis and test statistic, are available from the corresponding author. The reported programming allows the user to complete mediation testing with the user's own data in a single-step fashion. A technical manual included with the programming provides instruction on program use and interpretation of the output. Mediation modeling is a useful tool for describing the relation between three or more variables. Programming and manuals for using this model are made available.

  1. Startup of Experimental Lithium System

    International Nuclear Information System (INIS)

    McCauley, D.L.

    1980-06-01

    The Experimental Lithium System (ELS) is designed for full-scale testing of targets and other lithium system components for the Fusion Materials Irradiation Test (FMIT) Facility. The system also serves as a test bed for development of lithium purification and characterization equipment, provides experience in operation of large lithium systems, and helps guide FMIT design

  2. 75 FR 59105 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2010-09-27

    ... 2105-AE03 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug... the Federal workplace drug testing program but also pointed out that ``* * * the Department of.... Executive Order 12866 and Regulatory Flexibility Act This Interim Final Rule is not significant for purposes...

  3. Tokamak startup with electron cyclotron heating

    International Nuclear Information System (INIS)

    Holly, D.J.; Prager, S.C.; Shepard, D.A.; Sprott, J.C.

    1980-04-01

    Experiments are described in which the startup voltage in a tokamak is reduced by approx. 60% by the use of a modest amount of electron cyclotron resonance heating power for preionization. A 50% reduction in volt-second requirement and impurity reflux are also observed

  4. From Jam to Start-up

    DEFF Research Database (Denmark)

    Bering Kjæhr, Emil; Lyngbye Hvid Jensen, Jane; Schoenau-Fog, Henrik

    2015-01-01

    the foundation for new start-up companies. There are, however, an even larger group of very creative and innovative games and artifacts with great potential that go unpublished. This potentially leads to a loss of entrepreneurial opportunities and ultimately the jobs and careers such games could have fostered...

  5. Light duty utility arm startup plan

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1998-01-01

    This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO)

  6. Tokamak startup with electron cyclotron heating

    Energy Technology Data Exchange (ETDEWEB)

    Holly, D J; Prager, S C; Shepard, D A; Sprott, J C

    1980-04-01

    Experiments are described in which the startup voltage in a tokamak is reduced by approx. 60% by the use of a modest amount of electron cyclotron resonance heating power for preionization. A 50% reduction in volt-second requirement and impurity reflux are also observed.

  7. Research Strategies in Science-based Start-ups

    DEFF Research Database (Denmark)

    Valentin, Finn; Dahlgren, Johan Henrich; Lund Jensen, Rasmus

    develop a contingency view on complex problem solving which structures the argument into three steps:1) Characterising the problem architectures addressed by different types of DBFs;2) Testing and confirming that DBFs form requisite research strategies, by which we refer to problem solving approaches......Although biotech start-ups fail or succeed based on their research few attempts have been made to examine if and how they strategize in this core of their activity. Popular views on Dedicated Biotech Firms (DBFs) see the inherent uncertainty of research as defying notions of strategizing, directing...

  8. The plane strain tests in the PROMETRA program

    International Nuclear Information System (INIS)

    Cazalis, B.; Desquines, J.; Carassou, S.; Le Jolu, T.; Bernaudat, C.

    2016-01-01

    A fuel cladding mechanical test, performed under conditions of plane strain deformation in the transverse direction of tube axis, was originally developed at Pennsylvania State University. It was decided to implement this original test within the PROMETRA program using the same experimental procedure and its optimization for a ring mechanical testing on plane strain conditions (PST tests) in hot cells laboratory. This paper presents a detailed description and an interpretation of the Plane Strain Tensile (PST) tests performed in the framework of the PROMETRA program on fresh and irradiated claddings. At first, the context of the PST tests is situated and the specificities of these tests implemented at CEA are justified. Indeed, a significant adjustment of the original experimental procedure is carried out in order to test the irradiated fuel cladding in the best possible conditions. Then, the tests results on fresh Zircaloy-4 and on irradiated Zircaloy-4, M5™ and ZIRLO ® specimens are gathered. The main analyses in support of these tests, such as metallographies, fractographic examinations and finite element simulations are detailed. Finally, a synthesis of the interpretation of the tests is proposed. The PST test seems only representative of plane strain fracture conditions when the test material is very ductile (fresh or high temperature or low hydride material like M5TM). However, it provides a relevant representation of the RIA rupture initiation which is observed in irradiated cladding resulting from hydride rim damage due to the strong irradiation of a fuel rod. - Highlights: • A plane strain mechanical test performed on fuel rod claddings is described. • The tests are performed in the framework of the French PROMETRA program. • Fresh Zircaloy-4 and irradiated Zircaloy-4, M5 and ZIRLO specimens are tested. • The main analyses in support of these tests are detailed. • A synthesis of the interpretation of the PST tests is proposed.

  9. The plane strain tests in the PROMETRA program

    Energy Technology Data Exchange (ETDEWEB)

    Cazalis, B., E-mail: bernard.cazalis@irsn.fr [Institut de Radioprotection et de Sûreté Nucléaire, IRSN/PSN-RES, F-13115 Saint-Paul Lez Durance BP3 (France); Desquines, J. [Institut de Radioprotection et de Sûreté Nucléaire, IRSN/PSN-RES, F-13115 Saint-Paul Lez Durance BP3 (France); Carassou, S.; Le Jolu, T. [Commissariat à l' Energie Atomique, CEA/DEN/DMN, F- 91191 Gif-sur-Yvette (France); Bernaudat, C. [Electricité de France, EDF/SEPTEN, F-69628 Villeurbanne (France)

    2016-04-15

    A fuel cladding mechanical test, performed under conditions of plane strain deformation in the transverse direction of tube axis, was originally developed at Pennsylvania State University. It was decided to implement this original test within the PROMETRA program using the same experimental procedure and its optimization for a ring mechanical testing on plane strain conditions (PST tests) in hot cells laboratory. This paper presents a detailed description and an interpretation of the Plane Strain Tensile (PST) tests performed in the framework of the PROMETRA program on fresh and irradiated claddings. At first, the context of the PST tests is situated and the specificities of these tests implemented at CEA are justified. Indeed, a significant adjustment of the original experimental procedure is carried out in order to test the irradiated fuel cladding in the best possible conditions. Then, the tests results on fresh Zircaloy-4 and on irradiated Zircaloy-4, M5™ and ZIRLO{sup ®} specimens are gathered. The main analyses in support of these tests, such as metallographies, fractographic examinations and finite element simulations are detailed. Finally, a synthesis of the interpretation of the tests is proposed. The PST test seems only representative of plane strain fracture conditions when the test material is very ductile (fresh or high temperature or low hydride material like M5TM). However, it provides a relevant representation of the RIA rupture initiation which is observed in irradiated cladding resulting from hydride rim damage due to the strong irradiation of a fuel rod. - Highlights: • A plane strain mechanical test performed on fuel rod claddings is described. • The tests are performed in the framework of the French PROMETRA program. • Fresh Zircaloy-4 and irradiated Zircaloy-4, M5 and ZIRLO specimens are tested. • The main analyses in support of these tests are detailed. • A synthesis of the interpretation of the PST tests is proposed.

  10. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Malfunction, startup, and shutdown..., startup, and shutdown regulations. (a) The following regulations are disapproved because they would permit... malfunctions and/or fail to sufficiently limit startup and shutdown exemptions to those periods where it is...

  11. 40 CFR 61.09 - Notification of startup.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  12. The MuCool Test Area and RF Program

    International Nuclear Information System (INIS)

    Torun, Y.; Huang, D.; Norem, J.; Palmer, Robert B.; Stratakis, Diktys; Bross, A.; Chung, M.; Jansson, A.; Moretti, A.; Yonehara, K.; Li, D.

    2010-01-01

    The MuCool RF Program focuses on the study of normal conducting RF structures operating in high magnetic field for applications in muon ionization cooling for Neutrino Factories and Muon Colliders. Here we give an overview of the program, which includes a description of the test facility and its capabilities, the current test program, and the status of a cavity that can be rotated in the magnetic field, which allows for a detailed study of the maximum stable operating gradient vs. magnetic field strength and angle.

  13. Start-up support for New Brunswick Electric's Point Lepreau nuclear steam generators

    International Nuclear Information System (INIS)

    Schneider, W.; Leroux, A.

    1983-05-01

    The start-up of the 600 MW Point Lepreau reactor provided the opportunity for direct involvement in the important low and medium power start-up phase which was of particular interest because this was a first-of-a-kind reactor type incorporating a new steam generator design. Support included test assistance and test results interpretation for the thermal hydraulic performance of the steam generators and in particular, investigation of water level response to operating pressure, power and feed flow. This work resulted in both a greatly improved understanding of transient characteristics and in a number of beneficial refinements in the control methods

  14. Testing the Structure of Hydrological Models using Genetic Programming

    Science.gov (United States)

    Selle, B.; Muttil, N.

    2009-04-01

    Genetic Programming is able to systematically explore many alternative model structures of different complexity from available input and response data. We hypothesised that genetic programming can be used to test the structure hydrological models and to identify dominant processes in hydrological systems. To test this, genetic programming was used to analyse a data set from a lysimeter experiment in southeastern Australia. The lysimeter experiment was conducted to quantify the deep percolation response under surface irrigated pasture to different soil types, water table depths and water ponding times during surface irrigation. Using genetic programming, a simple model of deep percolation was consistently evolved in multiple model runs. This simple and interpretable model confirmed the dominant process contributing to deep percolation represented in a conceptual model that was published earlier. Thus, this study shows that genetic programming can be used to evaluate the structure of hydrological models and to gain insight about the dominant processes in hydrological systems.

  15. Integrated Data Collection Analysis (IDCA) Program - SSST Testing Methods

    Energy Technology Data Exchange (ETDEWEB)

    Sandstrom, Mary M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brown, Geoffrey W. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Preston, Daniel N. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Pollard, Colin J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Warner, Kirstin F. [Naval Surface Warfare Center (NSWC), Indian Head, MD (United States). Indian Head Division; Remmers, Daniel L. [Naval Surface Warfare Center (NSWC), Indian Head, MD (United States). Indian Head Division; Sorensen, Daniel N. [Naval Surface Warfare Center (NSWC), Indian Head, MD (United States). Indian Head Division; Whinnery, LeRoy L. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Phillips, Jason J. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Shelley, Timothy J. [Bureau of Alcohol, Tobacco and Firearms (ATF), Huntsville, AL (United States); Reyes, Jose A. [Applied Research Associates, Tyndall AFB, FL (United States); Hsu, Peter C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Reynolds, John G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-03-25

    The Integrated Data Collection Analysis (IDCA) program is conducting a proficiency study for Small- Scale Safety and Thermal (SSST) testing of homemade explosives (HMEs). Described here are the methods used for impact, friction, electrostatic discharge, and differential scanning calorimetry analysis during the IDCA program. These methods changed throughout the Proficiency Test and the reasons for these changes are documented in this report. The most significant modifications in standard testing methods are: 1) including one specified sandpaper in impact testing among all the participants, 2) diversifying liquid test methods for selected participants, and 3) including sealed sample holders for thermal testing by at least one participant. This effort, funded by the Department of Homeland Security (DHS), is putting the issues of safe handling of these materials in perspective with standard military explosives. The study is adding SSST testing results for a broad suite of different HMEs to the literature. Ultimately the study will suggest new guidelines and methods and possibly establish the SSST testing accuracies needed to develop safe handling practices for HMEs. Each participating testing laboratory uses identical test materials and preparation methods wherever possible. The testing performers involved are Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Indian Head Division, Naval Surface Warfare Center, (NSWC IHD), Sandia National Laboratories (SNL), and Air Force Research Laboratory (AFRL/RXQL). These tests are conducted as a proficiency study in order to establish some consistency in test protocols, procedures, and experiments and to compare results when these testing variables cannot be made consistent.

  16. Success and Failure in University-Based Startups

    Science.gov (United States)

    Dehn, J.; Webley, P.; Cunningham, K. W.

    2014-12-01

    Adapting from a traditional government-funded research program to supporting the work through a start-up company is a difficult (and often not successful) transition. This is made more challenging in that with the relative decline in federal funding for the sciences the transition is forced on many researchers as a matter of survival. The business model of traditional research is not that different from that of the private sector; the development of an idea, models or mock-ups of the product, pitching to sources of funding, creating and marketing the product. However they differ significantly in the environment in which they are applied, as well as in the life span of a project or product. The environments for pitching an idea and gaining investment are very different in academia from that of the private sector, and most academics are stymied by the new approach. In addition, many universities labor under the illusion that start-ups will be a windfall, when in reality they represent a long term investment that will not pay out for many years. This extended timeline is also something new to academics, though persistence pays and a project may take years to fund, after it is complete and the publications written, many in the geosciences go on to new ideas. If a business is to be successful it must continue with a product long term, and develop new ideas around it. A hopefully successful balance of these approaches is being tried at the University of Alaska Fairbanks, where start-ups can build upon university intellectual property and use university resources to build a successful business. In turn the business supports research and development, primarily through faculty, staff and students at the university.

  17. The value of business incubation services for early stage start-ups

    DEFF Research Database (Denmark)

    Jakobsen, Brian; Tanev, Stoyan; Jensen, Søren

    2017-01-01

    of the needs of early stage start-ups since they: i) do not have a well-articulated business model but work towards establishing one; ii) operate under conditions of significantly high risks and uncertainties; and iii) have not developed the minimum viable set of partners that would enable them to demonstrate...... in specific incubation programs. The findings should contribute to existing literature within the topic of business-incubation, as well as provide managers of both incubators and start-ups with actionable insights about the ways of maximizing the value of incubation services.......The paper focuses on conceptualizing the value of business incubation services for early stage start-ups that are typical of university-based entrepreneurial ecosystems. The challenge of such conceptualization consists in two main issues. The first issue is taking into account the specificity...

  18. 75 FR 3153 - Drug and Alcohol Testing Program; Correction

    Science.gov (United States)

    2010-01-20

    ... definition of prohibited drugs. In Sec. Sec. 120.103 and 120.211, we omitted the reference to Sec. 135.1 from.... FAA-2008-0937; Amendment No. 120-0A, 135-117A] RIN 2120-AJ37 Drug and Alcohol Testing Program... Aviation Administration (FAA) is correcting its drug and alcohol testing regulations published on May 14...

  19. Containment Leakage Rate Testing Program in NPP Krsko

    International Nuclear Information System (INIS)

    Dudas, M.; Heruc, Z.

    2002-01-01

    NPP Krsko adopted new regulations for testing of the reactor building containment as stipulated by 10CFR50 (Code of Federal Regulation) Appendix J, Option B instead of the previous requirement 10CFR50 Appendix J now renamed to 10CFR50 Appendix J, Option A. In the USA a thorough analyses of nuclear power plants reactor building containment testing was conducted. As part of these analyses the test results obtained from testing of various reactor-building containments in the last ten years were reviewed. It was concluded that it would be meaningful to, based on test results historical data, reconsider possibility of redefining testing intervals. The official proposal of such approach was reviewed and approved by the NRC and published in September of 1995 in the FR Vol.60 No.186. Based on directions from 10CFR50 Appendix J, Option B, the new criteria for definition of test intervals were created. Criteria were based upon past performance during testing (Performance-based Requirements) and safety impact. At NPP Krsko, the analyses of the Reactor Building Containment. Integrity Test results was performed . This included test results of the Containment Integrated Leak Rate Testing (CILRT or Type A tests), Containment Isolation Valves Local Leak Rater Tests (Type C tests) and Mechanical and Electrical Penetrations Local Leak Rate tests (Type B tests). In accordance with instructions from NEI 94-01 and based on analyses of test results, NPP Krsko created Containment Leakage Rate Testing Program with the purpose to establish the performance-based definition of test intervals, inspection scope, trending and reporting. Equally, the program gives instructions how to evaluate test results and how to deal with the containment penetration or isolation valve repair contingency. All changes caused with transition from Option A to Option B are marginal to public safety. (author)

  20. Programs for Testing Processor-in-Memory Computing Systems

    Science.gov (United States)

    Katz, Daniel S.

    2006-01-01

    The Multithreaded Microbenchmarks for Processor-In-Memory (PIM) Compilers, Simulators, and Hardware are computer programs arranged in a series for use in testing the performances of PIM computing systems, including compilers, simulators, and hardware. The programs at the beginning of the series test basic functionality; the programs at subsequent positions in the series test increasingly complex functionality. The programs are intended to be used while designing a PIM system, and can be used to verify that compilers, simulators, and hardware work correctly. The programs can also be used to enable designers of these system components to examine tradeoffs in implementation. Finally, these programs can be run on non-PIM hardware (either single-threaded or multithreaded) using the POSIX pthreads standard to verify that the benchmarks themselves operate correctly. [POSIX (Portable Operating System Interface for UNIX) is a set of standards that define how programs and operating systems interact with each other. pthreads is a library of pre-emptive thread routines that comply with one of the POSIX standards.

  1. DOES FAMILY SOCIAL SUPPORT AFFECT STARTUP BUSINESS ACTIVITIES?

    OpenAIRE

    Nurlaily F.; Aini E.K.; Asmoro P.S.

    2018-01-01

    In recent years, StartUp has shown a considerable progress in Indonesia. Although most of the StartUps are newly established companies in phase to find the right markets, the StartUps are expected to contribute to the economy and solve local problems. In Indonesia most of the StartUps are still in the idea stage. Therefore, they have no profit, loss, or even failure. It causes the StartUps to be difficult in gaining trust from investors. To overcome these problems, support from various partie...

  2. IFE chamber technology testing program in NIF and chamber development test plan

    International Nuclear Information System (INIS)

    Abdou, M.A.

    1995-01-01

    Issues concerning chamber technology testing program in NIF involving: criteria for evaluation/prioritization of experiments, engineering scaling requirements for test article design and material selection and R and D plan prior to NIF testing were addressed in this paper. In order to maximize the benefits of testing program in NIF, the testing in NIF should provide the experimental data relevant to DEMO design choice or to DEMO design predictive capability by utilizing engineering scaling test article designs. Test plans were developed for 2 promising chamber design concepts. Early testing in non-fusion/non-ignition prior to testing in ignition facility serves a critical role in chamber R and D test plans in order to reduce the risks and costs of the more complex experiments in NIF

  3. Is There a Lean Future for Global Startups?

    Directory of Open Access Journals (Sweden)

    Stoyan Tanev

    2017-05-01

    Full Text Available This article integrates insights from the latest research on the lean startup entrepreneurial method, born-global firms, and global startups. It contributes to the clarification of terminology referring to the global aspects of startups, summarizes insights from previous literature focusing on global startups, and further substantiates the articulation of the need for considering the lean global startup as a new type of firm. The main message is that the lessons learned from the emergence of lean startup entrepreneurship offer a basis for promoting a similar lean phase in technology-based global startup research and practice. The analysis should benefit both researchers and practitioners in technology entrepreneurship, international entrepreneurship, and global innovation management.

  4. BWR Full Integral Simulation Test (FIST) program: facility description report

    International Nuclear Information System (INIS)

    Stephens, A.G.

    1984-09-01

    A new boiling water reactor safety test facility (FIST, Full Integral Simulation Test) is described. It will be used to investigate small breaks and operational transients and to tie results from such tests to earlier large-break test results determined in the TLTA. The new facility's full height and prototypical components constitute a major scaling improvement over earlier test facilities. A heated feedwater system, permitting steady-state operation, and a large increase in the number of measurements are other significant improvements. The program background is outlined and program objectives defined. The design basis is presented together with a detailed, complete description of the facility and measurements to be made. An extensive component scaling analysis and prediction of performance are presented

  5. EBR-2 [Experimental Breeder Reactor-2] test programs

    International Nuclear Information System (INIS)

    Sackett, J.I.; Lehto, W.K.; Lindsay, R.W.; Planchon, H.P.; Lambert, J.D.B.; Hill, D.J.

    1990-01-01

    The Experimental Breeder Reactor-2 (EBR-2) is a sodium cooled power reactor supplying about 20 MWe to the Idaho National Engineering Laboratory (INEL) grid and, in addition, is the key component in the development of the Integral Fast Reactor (IFR). EBR-2's testing capability is extensive and has seen four major phases: (1) demonstration of LMFBR power plant feasibility, (2) irradiation testing for fuel and material development, (3) testing the off-normal performance of fuel and plant systems and (4) operation as the IFR prototype, developing and demonstrating the IFR technology associated with fuel and plant design. Specific programs being carried out in support of the IFR include advanced fuels and materials development, advanced control system development, plant diagnostics development and component testing. This paper discusses EBR-2 as the IFR prototype and the associated testing programs. 29 refs

  6. Summary of results from sodium-heated steam generator test program

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, J S

    1975-07-01

    A 28 MWt sodium-heated steam generator test unit developed and fabricated by Atomics International was operated in the Sodium Component Test Installation. The SCTI is located at the Liquid Metal Engineering Center which is operated for the Atomic Energy Commission by Atomics International, Reviewed in this paper are the results of the test operations and the findings of the post-test examination of the module. Testing was performed to assure the mechanical integrity of the unit over a wide range of simulated plant operating conditions and to develop a variety of performance data. Specific tests conducted included preheat, vibration, startup-shutdown, pressurization, steady state and parametric performance mapping, endurance, simulated leak injection, low- flow stability and simulated plant transients. (author)

  7. KNK I Test Program, Final Report Part 1

    International Nuclear Information System (INIS)

    Kathol, W.

    1976-01-01

    The compact sodium cooled nuclear reactor KNK I of the Karlsruhe Research Center reached full power for the first time in February 1974. The goal of KNK I is to collect experience for the construction and operation of larger reactors, such as SNR 300. In order to deepen these experiences, a test program was drawn up and conducted from 1973 until 1975 within the framework of R and D work on the development of fast breeder reactors. The program included individual tasks concerning reactor design, safety instrumentation, irradiation and post-examination as well as behavior of components during operation. The performance of the tests was essentially governed by the licensing procedure imposed under the atomic energy act for the construction and operation of nuclear facilities. This report is the first part of the final report of the test program

  8. A compliance testing program for diagnostic X-ray equipment

    International Nuclear Information System (INIS)

    Hutchinson, D.E.; Cobb, B.J.; Jacob, C.S.

    1999-01-01

    Compliance testing is nominally that part of a quality assurance program dealing with those aspects of X-ray equipment performance that are subject to radiation control legislation. Quality assurance programs for medical X-ray equipment should be an integral part of the quality culture in health care. However while major hospitals and individual medical centers may implement such programs with some diligence, much X-ray equipment can remain unappraised unless there is a comprehensive regulatory inspection program or some form of compulsion on the equipment owner to implement a testing program. Since the late 1950s all X-ray equipment in the State of Western Australia has been inspected by authorized officers acting on behalf of the Radiological Council, the regulatory authority responsible for administration of the State's Radiation Safety Act. However, economic constraints, coupled with increasing X-ray equipment numbers and a geographically large State have significantly affected the inspection rate. Data available from inspections demonstrate that regular compliance and performance checks are essential in order to ensure proper performance and to minimize unnecessary patient and operator dose. To ensure that diagnostic X-ray equipment complies with accepted standards and performance criteria, the regulatory authority introduced a compulsory compliance testing program for all medical, dental and chiropractic diagnostic X-ray equipment effective from 1 January 1997

  9. Framework for a National Testing and Evaluation Program ...

    Science.gov (United States)

    Abstract:The National STEPP Program seeks to improve water quality by accelerating the effective implementation and adoption of innovative stormwater management technologies. Itwill attempt to accomplish this by establishing practices through highly reliable, and cost-effective Stormwater control measures (SCM) testing, evaluation, and verification services. The program will aim to remove barriers to innovation, minimize duplicative performance evaluation needs, increase confidence that regulatory requirements are met by creating consistency among testing and evaluation protocols, and establishing equity between public domain and proprietary SCM evaluation approaches.The Environmental Technology Verification Program, established by the U.S. Environmental Protection Agency (EPA) 18 years ago, was the only national program of its kindin the stormwater sector, but is now defunct, leaving a national leadership void. The STEPP initiative was triggered in part by regulatory demands in the government and private sectors to fill this vacuum. A concerted focus and study of this matter led to the release of a Water Environment Federation (WEF) white paper entitled “Investigation into the Feasibility of a National Testing and Evaluation Program for Stormwater Products and Practices” in February 2014. During this second phase of the STEPP initiative, and with EPA support, five analogous technology evaluation programs related to both stormwater and non-stormwater were an

  10. Programme of CABRI start-up measurements with the Zircaloy loop

    International Nuclear Information System (INIS)

    Kussmaul, G.; Rongier, P.

    1981-06-01

    After installation and operational tests of the CABRI Zircaloy loop, a start-up test programme will be carried out to determine the new coupling value between the driver core and the test pin and the reactivity dependent driver core energy release for transients from different power levels and modified injection rates. The purpose of the tests and the test programme itself are described in the report

  11. Lean and global technology start-ups

    DEFF Research Database (Denmark)

    Tanev, Stoyan; Rasmussen, Erik Stavnsager; Zijdemans, Erik

    2015-01-01

    In this paper the authors introduce the concept of Lean Global Start-up (LGS) as a way of emphasizing the impossibility for new technology start-ups to deal separately with business development, innovation and early internationalization. For a newly established technology firm the task of being...... global and innovative at the same time should be seen as one process. The paper has two components – an introductory conceptual part and an empirical part that should be considered as basis for the preliminary validation of the conceptual insights. The research sample includes six firms – three from...... Canada and three from Denmark. The firms have had significant problems with the complexity, uncertainties and risks of being innovative on a global scale. They have however found ways of addressing these problems by a disciplined knowledge sharing and IP protection strategy and the efficient use...

  12. Smart or Diverse Start-up Teams?

    DEFF Research Database (Denmark)

    Hoogendoorn, Sander; Parker, Simon C.; Van Praag, Mirjam

    2017-01-01

    This paper explores the relationship between cognitive abilities and team performance in a start-up setting. We argue that performance in this setting hinges on three tasks: opportunity recognition, problem solving, and implementation. We theorize that cognitive ability at the individual level has...... others can be assigned to tasks that impose a greater cognitive load (problem solving or opportunity recognition). We present the results of a field experiment in which 573 students in 49 teams started up and managed real companies. We ensured exogenous variation in—otherwise random—team composition...... by assigning students to teams based on their measured cognitive abilities. Each team performed a variety of tasks, often involving complex decision making. The key result of the experiment is that the performance of start-up teams first increases and then decreases with ability dispersion. Strikingly, average...

  13. Model-based automated testing of critical PLC programs.

    CERN Document Server

    Fernández Adiego, B; Tournier, J-C; González Suárez, V M; Bliudze, S

    2014-01-01

    Testing of critical PLC (Programmable Logic Controller) programs remains a challenging task for control system engineers as it can rarely be automated. This paper proposes a model based approach which uses the BIP (Behavior, Interactions and Priorities) framework to perform automated testing of PLC programs developed with the UNICOS (UNified Industrial COntrol System) framework. This paper defines the translation procedure and rules from UNICOS to BIP which can be fully automated in order to hide the complexity of the underlying model from the control engineers. The approach is illustrated and validated through the study of a water treatment process.

  14. Evaluation of a Secure Laptop-Based Testing Program in an Undergraduate Nursing Program: Students' Perspective.

    Science.gov (United States)

    Tao, Jinyuan; Gunter, Glenda; Tsai, Ming-Hsiu; Lim, Dan

    2016-01-01

    Recently, the many robust learning management systems, and the availability of affordable laptops, have made secure laptop-based testing a reality on many campuses. The undergraduate nursing program at the authors' university began to implement a secure laptop-based testing program in 2009, which allowed students to use their newly purchased laptops to take quizzes and tests securely in classrooms. After nearly 5 years' secure laptop-based testing program implementation, a formative evaluation, using a mixed method that has both descriptive and correlational data elements, was conducted to seek constructive feedback from students to improve the program. Evaluation data show that, overall, students (n = 166) believed the secure laptop-based testing program helps them get hands-on experience of taking examinations on the computer and gets them prepared for their computerized NCLEX-RN. Students, however, had a lot of concerns about laptop glitches and campus wireless network glitches they experienced during testing. At the same time, NCLEX-RN first-time passing rate data were analyzed using the χ2 test, and revealed no significant association between the two testing methods (paper-and-pencil testing and the secure laptop-based testing) and students' first-time NCLEX-RN passing rate. Based on the odds ratio, however, the odds of students passing NCLEX-RN the first time was 1.37 times higher if they were taught with the secure laptop-based testing method than if taught with the traditional paper-and-pencil testing method in nursing school. It was recommended to the institution that better quality of laptops needs to be provided to future students, measures needed to be taken to further stabilize the campus wireless Internet network, and there was a need to reevaluate the Laptop Initiative Program.

  15. Means-Tested Public Assistance Programs and Adolescent Political Socialization.

    Science.gov (United States)

    Barnes, Carolyn Y; Hope, Elan C

    2017-07-01

    In recent years, scholars have pointed to the politically demobilizing effects of means-tested assistance programs on recipients. In this study, we bridge the insights from policy feedback literature and adolescent political socialization research to examine how receiving means-tested programs shapes parent influence on adolescent political participation. We argue that there are differences in pathways to political participation through parent political socialization and youth internal efficacy beliefs for adolescents from households that do or do not receive means-tested assistance. Using data from a nationally representative sample of 536 Black, Latino, and White adolescents (50.8% female), we find that adolescents from means-tested assistance households report less parent political socialization and political participation. For all youth, parent political socialization predicts adolescent political participation. Internal political efficacy is a stronger predictor of political participation for youth from a non-means-tested assistance household than it is for youth from a household receiving means-tested assistance. These findings provide some evidence of differential paths to youth political participation via exposure to means-tested programs.

  16. Marketing plan for business start-up

    OpenAIRE

    Kaisar, Jabed

    2016-01-01

    The marketing plan for the startup company concentrates on the affordable and effective marketing strategies for the new company with the limited budget for marketing. In this thesis, the shoe company named Jalkani is selected as the case study for the marketing plan. In the age of Internet, the marketing becomes more complex with the combination of the traditional advertising (paid advertisements in newspapers, billboard, or television) and the model digital marketing. The costs for each ...

  17. Plasma startup patterns in tokamak reactors

    International Nuclear Information System (INIS)

    Maki, Koichi; Tone, Tatsuzo.

    1983-01-01

    Plasma startup patterns are studied from the viewpoint of net power loss represented by the total power loss less the α-particle heating power. The existence is shown of a critical temperature of plasma at which the net power loss becomes independent of plasma density. Observations are made which indicate that the net power loss decreases with lowering plasma density in the range below the critical temperature and vice versa, whether governed by empirical or trapped-ion scaling laws. A startup pattern is presented which minimizes the net power loss during startup, and which prescribes that: (1) The plasma density should be kept as low as possible until the plasma is heated up to the critical temperature; (2) thereafter, the plasma density should be increased to its steady state value while retaining the critical temperature; and (3) finally, with the density kept constant, the temperature should be further raised to its steady state value. The net power loss at critical temperature represents the lower limit of heating power required to bring the plasma to steady state in tokamak reactors. (author)

  18. Material control and accounting self-test program design

    International Nuclear Information System (INIS)

    Eggers, R.F.; Wilson, R.L.; Byers, K.R.

    1981-01-01

    This paper describes a controversial but potentially beneficial MCandA strategy that has not been widely attempted in the past, called Self-Test. In this strategy a processor of Strategic Special Nuclear Material (SSNM) devises a program of internally administered tests to determine if the MCandA system performs in a reliable, expedient manner in the face of a simulated loss or compromise. Self-Test procedures would include, for example, the actual removal of SSNM from process equipment in order to determine whether the MCandA system will detect the simulated theft. Self-Test programs have several potential problems. However, an approach with the potential for solving many of these problems has been devised and is discussed

  19. MAVL wastes containers functional demonstration and associated tests program

    International Nuclear Information System (INIS)

    Templier, J.C.

    2002-01-01

    In the framework of studies on the MAVL wastes, the CEA develops containers for middle time wastes storage. This program aims to realize a ''B wastes containers'' demonstrator. A demonstrator is a container, parts of a container or samples which must validate the tests. This document presents the state of the study in the following three chapters: functions description, base data and design choices; presentation of the functional demonstrators; demonstration tests description. (A.L.B.)

  20. Cooperative field test program for wind systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bollmeier, W.S. II; Dodge, D.M.

    1992-03-01

    The objectives of the Federal Wind Energy Program, managed by the US Department of Energy (DOE), are (1) to assist industry and utilities in achieving a multi-regional US market penetration of wind systems, and (2) to establish the United States as the world leader in the development of advanced wind turbine technology. In 1984, the program conducted a series of planning workshops with representatives from the wind energy industry to obtain input on the Five-Year Research Plan then being prepared by DOE. One specific suggestion that came out of these meetings was that the federal program should conduct cooperative research tests with industry to enhance the technology transfer process. It was also felt that the active involvement of industry in DOE-funded research would improve the state of the art of wind turbine technology. DOE established the Cooperative Field Test Program (CFTP) in response to that suggestion. This program was one of the first in DOE to feature joint industry-government research test teams working toward common objectives.

  1. DWPF Stage 2: precipitation test program at Mott

    International Nuclear Information System (INIS)

    Schmitz, M.A.

    1981-01-01

    This memorandum covers the results of the test program conducted at Mott Metallurgical to determine cross-flow filter performance on potassium/cesium tetraphenylborate (K/Cs TPB)-sodium titanate slurries. The test program was designed to provide essential basic operating data to supplement the 1000-gallon cold process tests planned at TNX and the shielded cell tests with actual waste supernate planned by Chemical Technology. The specific Mott Metallurgical test objectives are outlined in DPST-81-722. During the Mott Metallurgical test program an average filtrate flow rate of approximately 0.05 gpm/ft 2 was repeatedly demonstrated over an 8-hr run with 0.5 micron filter elements. Initial Fe/Al sludge concentrations up to 150 ppM did not affect filter performance. Rheologies of the K/Cs TPB-sodium titanate slurries up to 13% by weight, the maximum concentration achieved, are summarized. Several recommendations are made to act as a guide for optimal filter performance

  2. Startup and first operation evaluation of the nuclear station at Fessenheim

    International Nuclear Information System (INIS)

    Leblond, Andre; Ferriole, Guy.

    1978-01-01

    Having first recalled the main characteristics of the Fessenheim power station and its different construction and startup stages, the starting tests and the difficulties encountered are described. The main results recorded and the conclusions which can be drawn are analyzed [fr

  3. Environmental test program for superconducting materials and devices

    Science.gov (United States)

    Haertling, Gene; Randolph, Henry; Hsi, Chi-Shiung; Verbelyi, Darren

    1991-01-01

    This report is divided into two parts. The first dealing with work involved with Clemson University and the second with the results from Westinghouse/Savannah River. Both areas of work involved low noise, low thermal conductivity superconducting grounding links used in the NASA-sponsored Spectroscopy of the Atmosphere using Far Infrared Emission (SAFIRE) Project. Clemson prepared the links from YBa2Cu3O(7-x) superconductor tape that was mounted on a printed circuit board and encapsulated with epoxy resin. The Clemson program includes temperature vs. resistance, liquid nitrogen immersion, water immersion, thermal cycling, humidity, and radiation testing. The evaluation of the links under a long term environmental test program is described. The Savannah River program includes gamma irradiation, vibration, and long-term evaluation. The progress made in these evaluations is discussed.

  4. Mathematical-programming approaches to test item pool design

    NARCIS (Netherlands)

    Veldkamp, Bernard P.; van der Linden, Willem J.; Ariel, A.

    2002-01-01

    This paper presents an approach to item pool design that has the potential to improve on the quality of current item pools in educational and psychological testing andhence to increase both measurement precision and validity. The approach consists of the application of mathematical programming

  5. 78 FR 12259 - Unmanned Aircraft System Test Site Program

    Science.gov (United States)

    2013-02-22

    ... addressing potential UAS privacy concerns, as set out herein, contact Gregory C. Carter, Office of the Chief... address privacy concerns relating to the operation of the test site program, the FAA intends to include in... among policymakers, privacy advocates, and the industry regarding broader questions concerning the use...

  6. 78 FR 53466 - Modification of Two National Customs Automation Program (NCAP) Tests Concerning Automated...

    Science.gov (United States)

    2013-08-29

    ... Customs Automation Program (NCAP) Tests Concerning Automated Commercial Environment (ACE) Document Image... National Customs Automation Program (NCAP) tests concerning document imaging, known as the Document Image... the National Customs Automation Program (NCAP) tests concerning document imaging, known as the...

  7. Ageing significantly at Temelin start-up process

    International Nuclear Information System (INIS)

    Brumovsky, M.; Zdarek, J.; Hahn, J.

    2002-01-01

    Full text: NPP Temelin is a unique case in Plant Life Management Programme application as it is now only in the period of start-up and thus all measures can be easily prepared and implemented in advance based on the experience of similar plants already in operation. Detailed analyses of potential damaging mechanisms as well as of initial conditions and properties of main components have been already done. Regarding this analysis, several measures have been prepared and put into operation: List of important parameters to be measured, saved and periodically analysed have been prepared - some of these parameters are measured in the framework of standard I and C system; new sets of sensors were installed for some additional ones; Special software for on-line evaluation of stress/temperature conditions and subsequently also fatigue damage in some chosen parts (with flow stratification etc.) have been installed and during reactor start-up tests have been checked; Surveillance specimen programme for reactor pressure vessel material monitoring was modified for better and fuller characterisation of material changes during operation; Ex-vessel neutron flux measurement has been established as a part of surveillance specimen programme. The whole Plant Life Management Programme is governed by a special PLIM Group in the plant with necessary links and responsibilities and rules with other necessary plant departments. (author)

  8. BNL NONLINEAR PRE TEST SEISMIC ANALYSIS FOR THE NUPEC ULTIMATE STRENGTH PIPING TEST PROGRAM

    International Nuclear Information System (INIS)

    DEGRASSI, G.; HOFMAYER, C.; MURPHY, C.; SUZUKI, K.; NAMITA, Y.

    2003-01-01

    The Nuclear Power Engineering Corporation (NUPEC) of Japan has been conducting a multi-year research program to investigate the behavior of nuclear power plant piping systems under large seismic loads. The objectives of the program are: to develop a better understanding of the elasto-plastic response and ultimate strength of nuclear piping; to ascertain the seismic safety margin of current piping design codes; and to assess new piping code allowable stress rules. Under this program, NUPEC has performed a large-scale seismic proving test of a representative nuclear power plant piping system. In support of the proving test, a series of materials tests, static and dynamic piping component tests, and seismic tests of simplified piping systems have also been performed. As part of collaborative efforts between the United States and Japan on seismic issues, the US Nuclear Regulatory Commission (USNRC) and its contractor, the Brookhaven National Laboratory (BNL), are participating in this research program by performing pre-test and post-test analyses, and by evaluating the significance of the program results with regard to safety margins. This paper describes BNL's pre-test analysis to predict the elasto-plastic response for one of NUPEC's simplified piping system seismic tests. The capability to simulate the anticipated ratcheting response of the system was of particular interest. Analyses were performed using classical bilinear and multilinear kinematic hardening models as well as a nonlinear kinematic hardening model. Comparisons of analysis results for each plasticity model against test results for a static cycling elbow component test and for a simplified piping system seismic test are presented in the paper

  9. Heavy Section Steel Technology Program. Part II. Intermediate vessel testing

    International Nuclear Information System (INIS)

    Whitman, G.D.

    1975-01-01

    The testing of the intermediate pressure vessels is a major activity under the Heavy Section Steel Technology Program. A primary objective of these tests is to develop or verify methods of fracture prediction, through the testing of selected structures and materials, in order that a valid basis can be established for evaluating the serviceability and safety of light-water reactor pressure vessels. These vessel tests were planned with sufficiently specific objectives that substantial quantitative weight could be given to the results. Each set of testing conditions was chosen so as to provide specific data by which analytical methods of predicting flaw growth, and in some cases crack arrest, could be evaluated. Every practical effort was made to assure that results would be relevant to some aspect of real reactor pressure vessel performance through careful control of material properties, selection of test temperatures, and design of prepared flaws. 5 references

  10. SSC string test facility for superconducting magnets: Testing capabilities and program for collider magnets

    International Nuclear Information System (INIS)

    Kraushaar, P.; Burgett, W.; Dombeck, T.; McInturff, A.; Robinson, W.; Saladin, V.

    1993-05-01

    The Accelerator Systems String Test (ASST) R ampersand D Testing Facility has been established at the SSC Laboratory to test Collider and High Energy Booster (HEB) superconducting magnet strings. The facility is operational and has had two testing periods utilizing a half cell of collider prototypical magnets with the associated spool pieces and support systems. This paper presents a description of the testing capabilities of the facility with respect to components and supporting subsystems (cryogenic, power, quench protection, controls and instrumentation), the planned testing program for the collider magnets

  11. Baikal-1 stand complex. Preparation and carrying out of the first energy start-up of the IVG-1 reactor

    International Nuclear Information System (INIS)

    Tikhomirov, L.N.

    1995-01-01

    The IVG-1 reactor was a first ground prototype of nuclear rocket engine. The reactor was built on the site 10 of the Semipalatinsk test site. Since the first energy start-up in 1975 the reactor was exploited 14 years till its modernization in 1989. The Bajkal-1 stand complex was designed and built for the carrying out of tests for fuel assemblies of different modifications. The energy start-up has been sum of long creative work of different research and constructive staffs on creation of high-temperature gas-cooled IVG-1 reactor. The history of construction, project and assembling of the stand complex is presented. Complex start and put works were carried out in the December 1974. Control physical start-up was carried out in the January 1975. Cold start-up by hydrogen was in the February 1975. Hot start-up was in the March 1975. The result of the hot start-up was experimental confirmation of metodics of thermohydrovlical estimations. 2 figs., 3 tabs

  12. Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program

    International Nuclear Information System (INIS)

    2002-01-01

    The Gas Generation Test Program (GGTP), referred to as the Program, is designed to establish the concentration of flammable gases and/or gas generation rates in a test category waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II). The phrase 'gas generationtesting' shall refer to any activity that establishes the flammable gas concentration or the flammable gas generation rate. This includes, but is not limited to, measurements performed directly on waste containers or during tests performed on waste containers. This Quality Assurance Program Plan (QAPP) documents the quality assurance (QA) and quality control (QC) requirements that apply to the Program. The TRUPACT-II requirements and technical bases for allowable flammable gas concentration and gas generation rates are described in the TRUPACT-II Authorized Methods for Payload Control (TRAMPAC).

  13. Spent fuel sabotage aerosol test program :FY 2005-06 testing and aerosol data summary

    International Nuclear Information System (INIS)

    Gregson, Michael Warren; Brockmann, John E.; Nolte, O.; Loiseau, O.; Koch, W.; Molecke, Martin Alan; Autrusson, Bruno; Pretzsch, Gunter Guido; Billone, M. C.; Lucero, Daniel A.; Burtseva, T.; Brucher, W; Steyskal, Michele D.

    2006-01-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program has been underway for several years. This program provides source-term data that are relevant to some sabotage scenarios in relation to spent fuel transport and storage casks, and associated risk assessments. This document focuses on an updated description of the test program and test components for all work and plans made, or revised, primarily during FY 2005 and about the first two-thirds of FY 2006. It also serves as a program status report as of the end of May 2006. We provide details on the significant findings on aerosol results and observations from the recently completed Phase 2 surrogate material tests using cerium oxide ceramic pellets in test rodlets plus non-radioactive fission product dopants. Results include: respirable fractions produced; amounts, nuclide content, and produced particle size distributions and morphology; status on determination of the spent fuel ratio, SFR (the ratio of respirable particles from real spent fuel/respirables from surrogate spent fuel, measured under closely matched test conditions, in a contained test chamber); and, measurements of enhanced volatile fission product species sorption onto respirable particles. We discuss progress and results for the first three, recently performed Phase 3 tests using depleted uranium oxide, DUO 2 , test rodlets. We will also review the status of preparations and the final Phase 4 tests in this program, using short rodlets containing actual spent fuel from U.S. PWR reactors, with both high- and lower-burnup fuel. These data plus testing results and design are tailored to support and guide, follow-on computer modeling of aerosol dispersal hazards and radiological consequence assessments

  14. Start-up date announced

    CERN Multimedia

    7th August 2008. CERN has announced that the first attempt to circulate the beam in the LHC will be made on the 10th September. This news comes as the cool down phase of commissioning the accelerator reaches a successful conclusion.The next phase is the synchronization of the LHC with the SPS accelerator, the last link in the LHC’s injector chain. A first synchronization test is scheduled for the 9th August, for the clockwise circulating beam, with the second to follow over the coming weeks.Once stable circulating beams have been established in September they will be brought to collision, and the final step will be to commission the LHC’s acceleration system to boost the energy to 5 TeV, the target energy for 2008.“We’re finishing a marathon with a sprint”, said LHC project leader Lyn Evans. “It’s been a long haul, and we’re all eager to get the LHC research programme underway.”For more information, please see the recent press release at: http://press.web.cern.ch/press/PressReleases/Rele...

  15. Mobile Energy Laboratory energy-efficiency testing programs

    Energy Technology Data Exchange (ETDEWEB)

    Parker, G B; Currie, J W

    1992-03-01

    This report summarizes energy-efficiency testing activities applying the Mobile Energy Laboratory (MEL) testing capabilities during the third and fourth quarters of fiscal year (FY) 1991. The MELs, developed by the US Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) and the Naval Energy and Environmental Support Activity (NEESA) for energy testing and energy conservation program support functions at federal facilities. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in Section 8 of the MEL Use Plan (PNL-6861) for semi-annual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semi-annually to establish priorities for energy-efficient testing applications using the MEL capabilities. The MEL Use Committee is composed of one representative each of the US Department of Energy, US Army, US Air Force, US Navy, and other federal agencies.

  16. Mobile Energy Laboratory energy-efficiency testing programs

    International Nuclear Information System (INIS)

    Parker, G.B.; Currie, J.W.

    1992-03-01

    This report summarizes energy-efficiency testing activities applying the Mobile Energy Laboratory (MEL) testing capabilities during the third and fourth quarters of fiscal year (FY) 1991. The MELs, developed by the US Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) and the Naval Energy and Environmental Support Activity (NEESA) for energy testing and energy conservation program support functions at federal facilities. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in Section 8 of the MEL Use Plan (PNL-6861) for semi-annual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semi-annually to establish priorities for energy-efficient testing applications using the MEL capabilities. The MEL Use Committee is composed of one representative each of the US Department of Energy, US Army, US Air Force, US Navy, and other federal agencies

  17. Piping vibrations measured during FFTF startup

    International Nuclear Information System (INIS)

    Anderson, M.J.

    1981-03-01

    An extensive vibration survey was conducted on the Fast Flux Test Facility piping during the plant acceptance test program. The purpose was to verify that both mechanical and flow induced vibration amplitudes were of sufficiently low level so that pipe and pipe support integrity would not be compromised over the plant design lifetime. Excitation sources included main heat transport sodium pumps, reciprocating auxiliary system pumps, EM pumps, and flow oscillations. Pipe sizes varied from one-inch to twenty-eight-inches in diameter. This paper describes the test plan; the instrumentation and procedures utilized; and the test results

  18. Test Report Emission Test Program EPA Information Collection Request for Delayed Coking Units 736 Coker Unit

    Science.gov (United States)

    ARI Environmental, Inc. (ARI) was retained by Houston Refining LP (HRO) to conduct an emission test program at their refinery located in Houston, Texas. The testing was conducted on on the 736 Delayed Coking Unit (DCU) in response to EPA's ICR.

  19. WIPP R and D in situ test program

    International Nuclear Information System (INIS)

    Tyler, L.D.

    1987-01-01

    The Waste Isolation Pilot Plant (WIPP) is a Department of Energy (DOE) RandD Facility for the purpose of developing the technology needed for the safe disposal of the United States' defense-related radioactive waste. The in situ test program focus is to provide the models and data to demonstrate the facility performance for isolation of waste at WIPP. The program is defined for the WIPP sealing system, thermal-structural interactions and waste package performance. A number of integrated large-scale underground tests have been operational since 1983 and are ongoing. The tests address the issues of both systems design and long-term isolation performance of the WIPP repository

  20. Growth Hacking for Startups : How Growth Hacking can utilised for growing startups

    OpenAIRE

    Lee, Jin

    2016-01-01

    In the era of start-ups, many failed to put out their prototypes or products to the market due to lack of funds or experience in marketing. Growth Hacking is a tool that start-ups can benefit from if they learn what Growth Hacking is and how to implement it. The aim of this thesis is to explore what Growth Hacking is and how to implement it for the commissioner CubiCasa Oy. A couple of Growth Hacking tactics are used for CubiCasa Oy and the process of implementation and findings are rec...

  1. Influence of startup oxidizing transients of IGA/SCC in PWR steam generators

    International Nuclear Information System (INIS)

    Gorman, J.A.; McIlree, A.R.; Gaudreau, T.; Bjornkvist, L.; Andersson, P.-O.

    1998-01-01

    There is a considerable amount of evidence oxidizing conditions during and following startups are an important factor in the intergranular corrosion/stress corrosion cracking (IGA/SCC) of mill annealed alloy 600 steam generator tubes. This evidence includes plant data that indicate that the growth of IGA/SCC correlates better in some cases with numbers of startups than with time at power, laboratory tests in several plausible crevice environments that show that small amounts of copper oxides accelerate the rate of IGA/SCC, laboratory tests that show that elevating the electrochemical potential (ECP) increases the rates of IGA/SCC in many chemical environments, and laboratory tests that show that copper oxides, hematite, and other oxidized corrosion products can raise the ECP of several solution chemistries into aggressive ranges. Some preliminary data also exist that show that some amounts of oxidized species are produced during typical layup and startup conditions, but data for the subsequent reduction of these oxides are largely lacking. The purpose of this paper is to review the available evidence, to arrive at conclusions regarding the probable importance of oxidizing conditions during startup on occurrence of IGA/SCC, and to identify needed research to better quantify the situation. (author)

  2. Large-Scale Seismic Test Program at Hualien, Taiwan

    International Nuclear Information System (INIS)

    Tang, H.T.; Graves, H.L.; Yeh, Y.S.

    1991-01-01

    The Large-Scale Seismic Test (LSST) Program at Hualien, Taiwan, is a follow-on to the soil-structure interaction (SSI) experiments at Lotung, Taiwan. The planned SSI studies will be performed at a stiff soil site in Hualien, Taiwan, that historically has had slightly more destructive earthquakes in the past than Lotung. The objectives of the LSST project is as follows: To obtain earthquake-induced SSI data at a stiff soil site having similar prototypical nuclear power plant soil conditions. To confirm the findings and methodologies validated against the Lotung soft soil SSI data for prototypical plant condition applications. To further validate the technical basis of realistic SSI analysis approaches. To further support the resolution of USI A-40 Seismic Design Criteria issue. These objectives will be accomplished through an integrated and carefully planned experimental program consisting of: soil characterization, test model design and field construction, instrumentation layout and deployment, in-situ geophysical information collection, forced vibration test, and synthesis of results and findings. The LSST is a joint effort among many interested parties. EPRI and Taipower are the organizers of the program and have the lead in planning and managing the program

  3. Large-Scale Seismic Test Program at Hualien, Taiwan

    International Nuclear Information System (INIS)

    Tang, H.T.; Graves, H.L.; Chen, P.C.

    1992-01-01

    The Large-Scale Seismic Test (LSST) Program at Hualien, Taiwan, is a follow-on to the soil-structure interaction (SSI) experiments at Lotung, Taiwan. The planned SSI studies will be performed at a stiff soil site in Hualien, Taiwan, that historically has had slightly more destructive earthquakes in the past than Lotung. The LSST is a joint effort among many interested parties. Electric Power Research Institute (EPRI) and Taipower are the organizers of the program and have the lead in planning and managing the program. Other organizations participating in the LSST program are US Nuclear Regulatory Commission, the Central Research Institute of Electric Power Industry, the Tokyo Electric Power Company, the Commissariat A L'Energie Atomique, Electricite de France and Framatome. The LSST was initiated in January 1990, and is envisioned to be five years in duration. Based on the assumption of stiff soil and confirmed by soil boring and geophysical results the test model was designed to provide data needed for SSI studies covering: free-field input, nonlinear soil response, non-rigid body SSI, torsional response, kinematic interaction, spatial incoherency and other effects. Taipower had the lead in design of the test model and received significant input from other LSST members. Questions raised by LSST members were on embedment effects, model stiffness, base shear, and openings for equipment. This paper describes progress in site preparation, design and construction of the model and development of an instrumentation plan

  4. Startup methods for single-mode gyrotron operation

    International Nuclear Information System (INIS)

    Whaley, D.R.; Tran, M.Q.; Alberti, S.; Tran, T.M.; Antonsen, T.M. Jr.; Dubrovin, A.; Tran, C.

    1995-01-01

    Experimental results of startup studies on a 118 GHz TE 22,6 gyrotron are presented and compared with theory. The startup paths through the energy-velocity-pitch-angle plane are determined by the time evolution of the beam parameters during the startup phase. These startup paths are modified by changing the anode and cathode voltage rise from zero to their nominal values and are seen to determine the cavity oscillating mode. Experimental results show specifically that competition between the TE 22,6 and TE -19,7 mode can be completely eliminated by use of the proper startup method in a case where a typical triode startup results in oscillation in the competing TE -19,7 mode. These new results are shown to be in excellent agreement with the theory whose approach is general and therefore applicable to gyrotrons operating in any arbitrary cavity mode. (author) 3 figs., 4 refs

  5. Start-up simulations of the PULSAR pulsed tokamak reactor

    International Nuclear Information System (INIS)

    Werley, K.A.; Bathke, C.G.

    1993-01-01

    Start-up conditions are examined for a pulsed tokamak reactor that uses only inductively driven plasma current (and bootstrap current). A zero-dimensional (profile-averaged) model containing plasma power and particle balance equations is used to study several aspects of plasma start-up, including: (1) optimization of the start-up pathway; (2) tradeoffs of auxiliary start-up heating power versus start-up time; (3) volt-second consumption; (4) thermal stability of the operating point; (5) estimates of the diverter heat flux and temperature during the start-up transient; (6) the sensitivity of the available operating space to allowed values of the H confinement factor; and (7) partial-power operations

  6. Cost estimate for a proposed GDF Suez LNG testing program

    Energy Technology Data Exchange (ETDEWEB)

    Blanchat, Thomas K.; Brady, Patrick Dennis; Jernigan, Dann A.; Luketa, Anay Josephine; Nissen, Mark R.; Lopez, Carlos; Vermillion, Nancy; Hightower, Marion Michael

    2014-02-01

    At the request of GDF Suez, a Rough Order of Magnitude (ROM) cost estimate was prepared for the design, construction, testing, and data analysis for an experimental series of large-scale (Liquefied Natural Gas) LNG spills on land and water that would result in the largest pool fires and vapor dispersion events ever conducted. Due to the expected cost of this large, multi-year program, the authors utilized Sandia's structured cost estimating methodology. This methodology insures that the efforts identified can be performed for the cost proposed at a plus or minus 30 percent confidence. The scale of the LNG spill, fire, and vapor dispersion tests proposed by GDF could produce hazard distances and testing safety issues that need to be fully explored. Based on our evaluations, Sandia can utilize much of our existing fire testing infrastructure for the large fire tests and some small dispersion tests (with some modifications) in Albuquerque, but we propose to develop a new dispersion testing site at our remote test area in Nevada because of the large hazard distances. While this might impact some testing logistics, the safety aspects warrant this approach. In addition, we have included a proposal to study cryogenic liquid spills on water and subsequent vaporization in the presence of waves. Sandia is working with DOE on applications that provide infrastructure pertinent to wave production. We present an approach to conduct repeatable wave/spill interaction testing that could utilize such infrastructure.

  7. U.S. EPR ITAAC: coordination with construction and startup

    International Nuclear Information System (INIS)

    Magnarelli, D.; Levin, A.E.

    2007-01-01

    The 10 CFR 52 process provides for a single combined license (COL) to be granted prior to the beginning of construction. Incorporated into the COL is a set of inspections, tests, analyses and acceptance criteria (ITAAC) which, when satisfied, provide the Nuclear Regulatory Commission (NRC) with reasonable assurance that the completed plant has been constructed properly and will operate safely in accordance with the terms of the license. The licensee performs the inspections, tests and analyses, and determines that the acceptance criteria have been fulfilled; the NRC must make a finding that the ITAAC requirements have been satisfied before fuel loading at the nuclear power plant is permitted. The challenge is that the concept of ITAAC is new and not well defined. This paper addresses some of the ITAAC issues for the U.S. EPR approach for coordination of ITAAC with design, procurement, construction and startup activities to ensure timely approval of fuel loading and commissioning for plant operation. (authors)

  8. Indicators for monitoring screening programs with primary HPV test.

    Science.gov (United States)

    Zorzi, Manuel; Giorgi Rossi, Paolo

    2017-01-01

    following scientific evidence produced in numerous studies, as well as national and international guidelines, organized cervical cancer screening programs in Italy have gradually introduced the HPV test as primary screening test, replacing cytology. As public health interventions, screening programs must ensure equity, improvement in quality of life, and adequate information for the population involved with regards to benefits and possible risks; therefore, it is essential for quality to be constantly checked at every phase of the project.The Italian Cervical Screening Group (Gruppo Italiano per lo Screening Cervicale, GISCi) has written a handbook for the calculation and interpretation of cervical screening program monitoring indicators that take into account the new protocol based on primary HPV test with cytology triage. based on the European guidelines and Italian recommendations on primary HPVbased screening, the working group, which includes professionals from all the fields involved in cervical screening, identified the essential points needed to monitor the screening process, the accuracy of individual tests, and early outcomes, defining a specific indicator for each aspect. The indicators were grouped as follows: baseline indicators, indicators for test repeat after one year, cumulative indicators, and waiting times. For every indicator, the source of data, calculation formula, any standards or critical thresholds, and interpretation were defined. The standards are based on the results of NTCC trials or Italian pilot studies. the main indicators proposed for the organization are the following: number of invitations, compliance with first invitation, with one-year test repeat and with colposcopy; for test and process accuracy, a cohort approach was utilised, where indicators are based on women who must be followed for at least one year, so as to integrate the results obtained after the first HPV test with the outcome of the test's repetition after one year

  9. The joint EC/EPA mid-Connecticut test program

    International Nuclear Information System (INIS)

    Kilgroe, J.D.; Brna, T.G.

    1991-01-01

    In early 1989, Environment Canada and the U.S. Environmental Protection Agency sponsored a comprehensive test program on a refuse-derived fuel (RDF) unit of the Mid-Connecticut facility in Hartford. The program, conducted in cooperation with the Connecticut Resource Recovery Authority (CRRA), the facility's operator, included characterization and performance test phases. The results of the characterization tests were used in defining both the combustion and flue gas cleaning system operating conditions for the performance tests. The results of the performance tests are emphasized in this paper and are summarized in three parts. First, the combustion tests results will be addressed and related to good combustion practice for RDF combustors. Then, the performance of the lime spray dryer absorber/fabric filter system in controlling acid gas (hydrogen chloride, sulfur dioxide), trace organic [polychlorinated dibenzodioxin (PCDD) and polychlorinated dibenzofuran (PCDF)], trace metal [arsenic (as), cadmium (Cd), chromium (Cr), lead (Pb), mercury (Hg), nickel (Ni), and zinc (Zn)], and particulate matter (PM) emissions will be discussed. Finally, the results of ash/residue analyses will be presented

  10. Describing of elements IO field in a testing computer program

    Directory of Open Access Journals (Sweden)

    Igor V. Loshkov

    2017-01-01

    Full Text Available A standard of describing the process of displaying interactive windows on a computer monitor, through which an output of questions and input of answers are implemented during computer testing, is presented in the article [11]. According to the proposed standard, the description of the process mentioned above is performed with a format line, containing element names, their parameters as well as grouping and auxiliary symbols. Program objects are described using elements of standard. The majority of objects create input and output windows on a computer monitor. The aim of our research was to develop a minimum possible set of elements of standard to perform mathematical and computer science testing.The choice of elements of the standard was conducted in parallel with the development and testing of the program that uses them. This approach made it possible to choose a sufficiently complete set of elements for testing in fields of study mentioned above. For the proposed elements, names were selected in such a way: firstly, they indicate their function and secondly, they coincide with the names of elements in other programming languages that are similar by function. Parameters, their names, their assignments and accepted values are proposed for the elements. The principle of name selection for the parameters was the same as for elements of the standard: the names should correspond to their assignments or coincide with names of similar parameters in other programming languages. The parameters define properties of objects. Particularly, while the elements of standard create windows, the parameters define object properties (location, size, appearance and the sequence in which windows are created. All elements of standard, proposed in this article are composed in a table, the columns of which have names and functions of these elements. Inside the table, the elements of standard are grouped row by row into four sets: input elements, output elements, input

  11. Emissions of polychlorinated diphenyl ethers from a municipal solid waste incinerator during the start-up operation

    International Nuclear Information System (INIS)

    Yang, Jing-Sing; Lin, Sheng-Lun; Lin, Ta-Chang; Wu, Yee-Lin; Wang, Lin-Chi; Chang-Chien, Guo-Ping

    2015-01-01

    Highlights: • This is the first study on the PCDE emission during a MSWI start-up procedure. • The highest PCDE level occurred similar to the PCDD/F reformation temperature. • The pollution control were modified and reduce 86% PCDE peak emission. • Multiple start-ups are analyzed for their effects on the annual PCDE emission. - Abstract: This study examines the emissions of polychlorinated diphenyl ethers (PCDEs) during the start-up processes of a municipal solid waste incinerator (MSWI). Both normal and modified emission control start-ups were tested. Fifteen samples were taken from the flue gas with increasing furnace temperature. Peak PCDE concentrations of 1.48–10.3 ng/Nm 3 were observed at 8–11 h after the start of combustion, when the furnace temperature was in the range of 267–440 °C, that also needed for PCDD/F formation by de novo synthesis. The PCDE emissions could thus, be reduced by current control techniques. Furthermore, the modified control strategies inhibited PCDE formation at the beginning of combustion, and led to an 86% reduction in the maximum PCDE concentration. The overall start-up emissions were calculated as 1.01–3.08 mg, while the annual PCDE emissions with one start-up operation were found to be 7.48–9.64 mg. However, total PCDE emissions will increase by 12–69% if the number of start-up runs increases to between two and eight times per year. Consequently, the prevention of the unnecessary start-ups and advanced activation of the related emission control system are both efficient ways to reduce PCDE emissions.

  12. Emissions of polychlorinated diphenyl ethers from a municipal solid waste incinerator during the start-up operation

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jing-Sing [Department of Environmental Engineering, National Cheng Kung University, Tainan 70101, Taiwan (China); Lin, Sheng-Lun, E-mail: cbmsgml@gmail.com [Department of Civil Engineering and Geomatics, Cheng Shiu University, Kaohsiung 83347, Taiwan (China); Super Micro Mass Research and Technology Center, Cheng Shiu University, Kaohsiung 83347, Taiwan (China); Lin, Ta-Chang; Wu, Yee-Lin [Department of Environmental Engineering, National Cheng Kung University, Tainan 70101, Taiwan (China); Wang, Lin-Chi [Department of Civil Engineering and Geomatics, Cheng Shiu University, Kaohsiung 83347, Taiwan (China); Chang-Chien, Guo-Ping, E-mail: guoping@csu.edu.tw [Super Micro Mass Research and Technology Center, Cheng Shiu University, Kaohsiung 83347, Taiwan (China); Department of Cosmetic and Fashion Styling, Kaohsiung 83347, Taiwan (China)

    2015-12-15

    Highlights: • This is the first study on the PCDE emission during a MSWI start-up procedure. • The highest PCDE level occurred similar to the PCDD/F reformation temperature. • The pollution control were modified and reduce 86% PCDE peak emission. • Multiple start-ups are analyzed for their effects on the annual PCDE emission. - Abstract: This study examines the emissions of polychlorinated diphenyl ethers (PCDEs) during the start-up processes of a municipal solid waste incinerator (MSWI). Both normal and modified emission control start-ups were tested. Fifteen samples were taken from the flue gas with increasing furnace temperature. Peak PCDE concentrations of 1.48–10.3 ng/Nm{sup 3} were observed at 8–11 h after the start of combustion, when the furnace temperature was in the range of 267–440 °C, that also needed for PCDD/F formation by de novo synthesis. The PCDE emissions could thus, be reduced by current control techniques. Furthermore, the modified control strategies inhibited PCDE formation at the beginning of combustion, and led to an 86% reduction in the maximum PCDE concentration. The overall start-up emissions were calculated as 1.01–3.08 mg, while the annual PCDE emissions with one start-up operation were found to be 7.48–9.64 mg. However, total PCDE emissions will increase by 12–69% if the number of start-up runs increases to between two and eight times per year. Consequently, the prevention of the unnecessary start-ups and advanced activation of the related emission control system are both efficient ways to reduce PCDE emissions.

  13. INDIAN POINT REACTOR STARTUP AND PERFORMANCE

    Energy Technology Data Exchange (ETDEWEB)

    Deddens, J. C.; Batch, M. L.

    1963-09-15

    The testing program for the Indian Point Reactor is discussed. The thermal and hydraulic evaluation of the primary coolant system is discussed. Analyses of fuel loading and initial criticality, measurement of operating coefficients of reactivity, control rod group reactivity worths, and xenon evaluation are presented. (R.E.U.)

  14. DOES FAMILY SOCIAL SUPPORT AFFECT STARTUP BUSINESS ACTIVITIES?

    Directory of Open Access Journals (Sweden)

    Nurlaily F.

    2018-02-01

    Full Text Available In recent years, StartUp has shown a considerable progress in Indonesia. Although most of the StartUps are newly established companies in phase to find the right markets, the StartUps are expected to contribute to the economy and solve local problems. In Indonesia most of the StartUps are still in the idea stage. Therefore, they have no profit, loss, or even failure. It causes the StartUps to be difficult in gaining trust from investors. To overcome these problems, support from various parties is necessary for the development of StartUp activities. One of them is a support from family (Family Social Support. Previous studies have shown that family support contributes to the success of an entrepreneur. However, there has been no research on the relationship between family support with StartUp activities, especially in developing countries like Indonesia. This study examined the influence of family social support in the form of financial capital support, social capital, human capital, physical capital, and family cohesiveness on StartUp activities in Indonesia by using Poisson regression analysis. The results showed that family cohesiveness had a significant effect on the increase of StartUp activities.

  15. Nuclear plant startup support problems experienced by B and W

    International Nuclear Information System (INIS)

    Spangler, W.H.; Phinney, J.D.

    1976-01-01

    There have now been enough nuclear power plants brought on line for the industry to recognize some of the problems that will occur during startup. Schedules are not being met; startup costs to both the utilities and the suppliers are excessive and unpredictable, and in some cases reliability has suffered. Manpower planning is difficult at best. Earlier and more accurate scheduling and planning are the most significant candidates for improvement. Greater attention to the startup organization and how it is to function is also a key. The organization should probably be designed with the specific startup task in mind

  16. Thermal hydraulic behavior of SCWR sliding pressure startup

    International Nuclear Information System (INIS)

    Fu Shengwei; Zhou Chong; Xu Zhihong; Yang Yanhua

    2011-01-01

    The modification to ATHLET-SC code is introduced in this paper, which realizes the simulation of trans-critical transients using two-phase model. With the modified code, the thermal-hydraulic dynamic behavior of the mixed SCWR core during the startup process is simulated. The startup process is similar to the design of SCLWR-H sliding pressure startup. The results show that maximum temperature of cladding-surface does not exceed 650℃ in the whole startup process, and the sudden change of water properties in the trans-critical transients will not cause harmful influence to the heat transfer of the fuel cladding. (authors)

  17. Safeguards system testing WSRC Insider Exercise Program (U)

    International Nuclear Information System (INIS)

    Robichaux, J.J.

    1991-01-01

    One of the major concerns related to the control and accountability of nuclear material located at DOE facilities is the theft or diversion of material by an insider. Many complex safeguards and security systems have been installed to provide timely detection and prevention of the removal of nuclear materials. The Westinghouse Savannah River Company's (WSRC) Material Control and Accountability (MC and A) section has implemented an insider exercise program designed to evaluate the effectiveness of these safeguards systems. Exercises consist of limited scope performance test. This paper describes the structure and controls for the insider exercise program at the Savannah River Site, the lessons learned over the past several years, and methods being utilized to improve the program

  18. Results of CABRI start-up measurements with the Zircaloy loop

    International Nuclear Information System (INIS)

    Kussmaul, G.; Rongier, P.

    1983-02-01

    After the change of the test loop in the CABRI core a start-up programme has been performed to determine the gain of coupling and the He-3 pressure-dependent driver core energy release for transients from different initial power levels and modified injection rates. This report gives the results of thirty tests and the means to adjust the experimental conditions of future CABRI tests

  19. Construction and start-up of a 250 kW natural gas fueled MCFC demonstration power plant

    Energy Technology Data Exchange (ETDEWEB)

    Figueroa, R.A.; Carter, J.; Rivera, R.; Otahal, J. [San Diego Gas & Electric, CA (United States)] [and others

    1996-12-31

    San Diego Gas & Electric (SDG&E) is participating with M-C Power in the development and commercialization program of their internally manifolded heat exchanger (IMHEX{reg_sign}) carbonate fuel cell technology. Development of the IMHEX technology base on the UNOCAL test facility resulted in the demonstration of a 250 kW thermally integrated power plant located at the Naval Air Station at Miramar, California. The members of the commercialization team lead by M-C Power (MCP) include Bechtel Corporation, Stewart & Stevenson Services, Inc., and Ishikawajima-Harima Heavy Industries (IHI). MCP produced the fuel cell stack, Bechtel was responsible for the process engineering including the control system, Stewart & Stevenson was responsible for packaging the process equipment in a skid (pumps, desulfurizer, gas heater, turbo, heat exchanger and stem generator), IHI produced a compact flat plate catalytic reformer operating on natural gas, and SDG&E assumed responsibility for plant construction, start-up and operation of the plant.

  20. Research activities and plan of electron cyclotron wave startup and Alfven wave current drive at SUNIST

    International Nuclear Information System (INIS)

    Gao Zhe; He Yexi; Tan Yi

    2009-01-01

    Using electromagnetic waves to startup and sustain plasma current takes a important role in the research program of the SUNIST spherical tokamak. Electron cyclotron ware (ECW) current startup have been investigated and revealed two totally different regimes. In the regime of very low working pressure, a plasma current of about 2 kA is obtained with a steadily applied vertical field of 12 Gauss and 40 kW/2.45 GHz microwave injection. In addition, the physics of the transient process during ECW startup in the relatively high working pressure regime is analyzed. The hardware preparation for the experimental research of Alfven wave current drive is being performed. The Alfven wave antenna system consists of four models in toroidal direction and two antenna straps in poloidal direction for each module and the rf generator has been designed as a four-phase oscillator (4x100 kW, 0.5 - 1 Mhz).The impedance spectrum of the antenna system is roughly evaluated by 1-D cylindrical magneto-hydrodynamic calculation. To investigate the wave-plasma interaction in ECW startup and Alfven wave current drive, upgrade of the device, especially in equilibrium control and diagnostics, is ongoing. (author)

  1. Validation experience with the core calculation program karate

    International Nuclear Information System (INIS)

    Hegyi, Gy.; Hordosy, G.; Kereszturi, A.; Makai, M.; Maraczy, Cs.

    1995-01-01

    A relatively fast and easy-to-handle modular code system named KARATE-440 has been elaborated for steady-state operational calculations of VVER-440 type reactors. It is built up from cell, assembly and global calculations. In the frame of the program neutron physical and thermohydraulic process of the core at normal startup, steady and slow transient can be simulated. The verification and validation of the global code have been prepared recently. The test cases include mathematical benchmark and measurements on operating VVER-440 units. Summary of the results, such as startup parameters, boron letdown curves, radial and axial power distributions of some cycles of Paks NPP is presented. (author)

  2. Startup measurements on the CABRI reactor

    International Nuclear Information System (INIS)

    Kussmaul, G.; Bensoussan, P.; Dadillon, J.; Golinelli, C.; Tonolli, J.

    1979-08-01

    The CABRI reactor will be used for the investigation of the behavior of fresh and irradiated fast reactor fuel pins under TOP conditions. A startup programme has been carried out to measure fundamental data determining steady state and transient behavior of the driver core as well as data ensuring safe operation of the reactor. Special emphasis was laid on quantities not well known from previous neutronics calculations, e.g. prompt-neutron generation time, Doppler feedback and time-dependent reactivity injection. Utilizing the data inferred from measurements in the dynamic code DULCINEE good agreement between calculated and observed transient behavior of the driver core has been found

  3. Startup of the Whiteshell irradiation facility

    International Nuclear Information System (INIS)

    Barnard, J.W.; Stanley, F.W.

    1989-01-01

    Recently, a 10-MeV, 1-kW electron linear accelerator was installed in a specially designed irradiation facility at the Whiteshell Nuclear Research Establishment. The facility was designed for radiation applications research in the development of new radiation processes up to the pilot scale level. The accelerator is of advanced design. Automatic startup via computer control makes it compatible with industrial processing. It has been operated successfully as a fully integrated electron irradiator for a number of applications including curing of plastics and composites, sterilization of medical disposables and animal feed irradiation. We report here on our experience during the first six months of operation. (orig.)

  4. Startup of the whiteshell irradiation facility

    Science.gov (United States)

    Barnard, J. W.; Stanley, F. W.

    1989-04-01

    Recently, a 10-MeV, 1-kW electron linear accelerator was installed in a specially designed irradiation facility at the Whiteshell Nuclear Research Establishment. The facility was designed for radiation applications research in the development of new radiation processes up to the pilot scale level. The accelerator is of advanced design. Automatic startup via computer control makes it compatible with industrial processing. It has been operated successfully as a fully integrated electron irradiator for a number of applications including curing of plastics and composites, sterilization of medical disposables and animal feed irradiation. We report here on our experience during the first six months of operation.

  5. Risk Management Program Application for the Component Test Capability

    International Nuclear Information System (INIS)

    Stephanie L. Austad; Jeffrey D. Bryan

    2009-01-01

    This paper documents the application of the risk management program requirements to Component Test Capability (CTC) Project activities for each CTC alternative. In particular, DOE O 413.3A, 'Program and Project Management for the Acquisition of Capital Assets,' and DOE G 413.3-7, 'Risk Management Guide for Project Management,' will apply in the event that Alternative 4, Single, Standalone Component Test Facility (CTF), is selected and approved. As such, it is advisable to begin planning to meet the associated Department of Energy (DOE) requirements and guidance as early in the acquisition process as practicable. This white paper is intended to assist in this planning and to support associated decision-making activities. Nontechnical risks associated with each alternative will be identified to support the Next Generation Nuclear Plant (NGNP) CTC alternatives analysis. Technical risks are assumed to be addressed through the Technology Development Risk Management modeling process and are inherent to the alternatives

  6. Influence of start-ups with fuel-oil on the operation of electrostatic precipitators in pulverised coal boilers

    Energy Technology Data Exchange (ETDEWEB)

    Navarrete, B.; Vilches, L.F.; Canadas, L.; Salvador, L. [University of Seville, Seville (Spain)

    2004-04-01

    This article describes the results of a series of tests carried out in a pilot fly ash electrostatic precipitation facility operating with real gases from a 550 MWe pulverized coal-fired power station. The main goal of these tests was to determine the effects of boiler start-ups on the performance of the electrostatic preciptator. The tests were carried out during start-ups of the power station boiler. All tests were carried out with the same fuel. An evaluation was made of the effects of the use of fuel-oil as auxillary fuel in start-ups and shut-downs of the boiler, and different electrostatic precipitators operation procedures were tested during start-ups and shut-downs. The results of the experiments made it possible to assess the relative importance of different variables on the possible deterioration of the efficiency of the precipitators. Also evaluated were operational modes that have demonstrated an improvement in the performance of the precipitators after the transient stage of these operations. As a result of this study, a number of important operational recommendations are made on boiler start-up and shut-down procedures.

  7. Overview and status of the SIMMER testing program

    International Nuclear Information System (INIS)

    Scott, J.H.

    1979-01-01

    Los Alamos Scientific Laboratory has undertaken an extensive experiment analysis program to test the results of SIMMER Liquid Metal Fast Breeder Reactor (LMFBR) accident calculations. Initially, we will test the postdisassembly work-energy partition problem. The SIMMER-calculated order-of-magnitude reduction of available kinetic energy following a severe hypothetical core-disruptive accident (HCDA) can be attributed to (1) purely fluid-dynamic effects; and (2) rate-controlled effects, such as phase transitions and heat transfer. We have chosen to test separately each class of mitigator. In this paper we review the experiments initially chosen for testing of each class of mitigator and report on the status of the analyses. We enumerate several problems in SIMMER that experiment analysis has disclosed. Finally, needs for future experiments are discussed

  8. FY11 Facility Assessment Study for Aeronautics Test Program

    Science.gov (United States)

    Loboda, John A.; Sydnor, George H.

    2013-01-01

    This paper presents the approach and results for the Aeronautics Test Program (ATP) FY11 Facility Assessment Project. ATP commissioned assessments in FY07 and FY11 to aid in the understanding of the current condition and reliability of its facilities and their ability to meet current and future (five year horizon) test requirements. The principle output of the assessment was a database of facility unique, prioritized investments projects with budgetary cost estimates. This database was also used to identify trends for the condition of facility systems.

  9. The initial criticality and nuclear commissioning test program at HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Choong-Sung; Seo, Chul-Gyo; Jun, Byung-Jin [Korea Atomic Energy Research Institute, Dukjin-Dong 150, Yusung-Ku, Taejon, 305-353 (Korea, Republic of)

    1995-07-01

    The construction of the Korea Multipurpose Research Reactor - HANARO of 3MW, developed by Korea Atomic Energy Research Institute, was completed at the beginning of this year. The first fuel loading began on February 2 1995, and initial criticality was achieved on February 8, when the core had four 18-element assemblies and thirteen 36-element assemblies. The critical control rod position was 600.8 mm which represents excess reactivity of 0.71 $. Currently the nuclear commissioning test is on going under the zero power range. This paper describes the initial criticality approach of the HANARO, and its nuclear commissioning test program. (author)

  10. DOE standard: Filter test facility quality program plan

    International Nuclear Information System (INIS)

    1999-02-01

    This standard was developed primarily for application in US Department of Energy programs. It contains specific direction for HEPA filter testing performed at a DOE-accepted HEPA Filter Test Facility (FTF). Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve this document should be sent to the Office of Nuclear Safety Policy and Standards (EH-31), US Department of Energy, Washington, DC 20585, by letter or by using the self-addressed Document Improvement Proposal form (DOE F 1300.3) appearing at the end of this document

  11. Business Incubators - the savior of startups? : An exploratory study on knowledge acquisition in a business incubator from a startup perspective

    OpenAIRE

    Pettersson, Beatrice; Götsén, Anna

    2016-01-01

    Startups play a vital role in economic development, however, have a high rate of failure, partly due to insufficient knowledge resources. A business incubator is an institution aimed to assist startups with services and resources in order to facilitate their development. There is, however, a gap in previous research regarding knowledge flows and acquisition in business incubators. Furthermore, few scholars have conducted research from the startup perspective in this context. This study, there...

  12. Summary of ROSA-4 LSTF first phase test program and station blackout (TMLB) test results

    International Nuclear Information System (INIS)

    Tasaka, K.; Kukita, Y.; Anoda, Y.

    1990-01-01

    This paper summarizes major test results obtained at the ROSA-4 Large Scale Test Facility (LSTF) during the first phase of the test program. The results from a station blackout (TMLB) test conducted at the end of the first-phase program are described in some detail. The LSTF is an integral test facility being operated by the Japan Atomic Energy Research Institute for simulation of pressurized water reactor (PWR) thermal-hydraulic responses during small-break loss-of-coolant accidents (SBLOCAs) and operational/abnormal transients. It is a 1/48 volumetrically scaled, full-height, full-pressure simulator of a Westinghouse-type 4-loop PWR. The facility includes two symmetric primary loops each one containing an active inverted-U tube steam generator and an active reactor coolant pump. The loop horizontal legs are sized to conserve the scaled (1/24) volumes as well as the length to the square root of the diameter ratio in order to simulate the two-phase flow regime transitions. The primary objective of the LSTF first-phase program was to define the fundamental PWR thermal-hydraulic responses during SBLOCAs and transients. Most of the tests were conducted with simulated component/operator failures, including unavailability of the high pressure injection system and auxiliary feedwater system, as well as operator failure to take corrective actions. The forty-two first phase tests included twenty-nine SBLOCA tests conducted mainly for cold leg breaks, three abnormal transient tests and ten natural circulation tests. Attempts were made in several of the SBLOCA tests to simulate the plant recovery procedures as well as candidate accident management measures for prevention of high-pressure core melt situation. The natural circulation tests simulated the single-phase and two-phase natural circulation as well as reflux condensation behavior in the primary loops in steady or quasi-steady states

  13. Test Program for the Performance Analysis of DNS64 Servers

    Directory of Open Access Journals (Sweden)

    Gábor Lencse

    2015-09-01

    Full Text Available In our earlier research papers, bash shell scripts using the host Linux command were applied for testing the performance and stability of different DNS64 server imple­mentations. Because of their inefficiency, a small multi-threaded C/C++ program (named dns64perf was written which can directly send DNS AAAA record queries. After the introduction to the essential theoretical background about the structure of DNS messages and TCP/IP socket interface programming, the design decisions and implementation details of our DNS64 performance test program are disclosed. The efficiency of dns64perf is compared to that of the old method using bash shell scripts. The result is convincing: dns64perf can send at least 95 times more DNS AAAA record queries per second. The source code of dns64perf is published under the GNU GPLv3 license to support the work of other researchers in the field of testing the performance of DNS64 servers.

  14. Study of startup conditions of a pulsed annular reactor

    International Nuclear Information System (INIS)

    Silva, Mario Augusto Bezerra da

    2003-10-01

    A new concept of reactor, which combines features of pulsed and stationary reactors, was proposed so as to produce intense neutronic fluxes. Such a reactor, known as VICHFPR (Very Intense Continuous High Flux Pulsed Reactor), consists of a subcritical core with an annular geometry and pulsed by a rotating reflector which acts as a reactivity modulator as it produces a short pulse (approximately equal to 1 ms) of high intensity, guiding the region near the pulser to super-prompt critical state. This dissertation intends to analyze the startup conditions of a Pulsed Annular Reactor. The evolution of the neutron pulse intensity is analyzed when the reactivity modulator is brought upwards according to a helicoidal path from its initial position (far away from the core), when the multiplication factor has a subcritical value, up to the final position (near the core), in which a super-prompt critical state is reached. Part of the analysis is based on the variation of neutron reflection, which is a uniform function of the exit and reflection angles between the core and the modulator. It must be emphasized that this work is an approximation of the real situation. As the initial and final reactor parameters are known, a programming code in Fortran is worked out to provide the multiplication factor and the flux intensity evolution. According to the results obtained with this code, the conditions under which the modulator must be lifted up during the startup are established. Basically, these conditions are related to the analysis of the rising and the rotation velocities, the reflector saving and the initial distance between the reactor and the modulator. The Pulsed Annular Reactor startup was divided into three stages. Because of its negative reactivity in the first two stages, the neutron multiplication is not large, while the last one, having a positive reactivity, shows an intense multiplication as is usually expected when handling pulsed systems. This last stage is quite

  15. Sensory submodalities testing in neurolinguistic programming, part of mental training

    Directory of Open Access Journals (Sweden)

    Vlad Teodor GROSU

    2017-03-01

    Full Text Available Introduction: this study is part of a larger work, which involves increasing sporting performance by applying mental training techniques – special techniques of neurolinguistic programming. In this case we will discuss some aspects of the test application Jacobson S. (2011. Purpose of study and hypothesis: In neurolinguistic programming (NLP we have studied the relationship between sensory submodalities, in accordance with the Jacobson test (2011. We wanted to check the degree of significance of the mean difference parameters studied and if the materiality result falls within the objective parameters. If ideomotor representations of athletes are completed with multiple sensations of all sensory submodalities such as visual, auditory, kinesthetic, olfactory and gustatory, the possibility of applying the techniques of NLP (neurolinguistic programming will have more effective results. Methods and material: two records were made by using two tests, test1 and test2 on master students of the University “Babes-Bolyai” Cluj-Napoca, from FEFS from APS department (training and sports performance. The statistical indicators were calculated on elements of descriptive statistics and the data is presented using indicators of centrality, location and distribution. Statistical analysis of non-parametric Wilcoxon test was used for sample pairs (data uneven distribution/rank. Materiality tests used was α=0.05 (5%, α=0.01 (1% or α=0.001. Results and deliberations: to detect the correlation between the two variables we used the Spearman rank correlation coefficient (ρ. Statistical analysis was performed using the correlation coefficients Colton’s rule. It was found that no statistically significant differences were observed (p>0.05 in the statistical analysis of sample pairs Jacobson test values (times T1-T2. This is a result of the short timeframe – just one month – for objectives reasons. However, many of them appear in a good and a very good

  16. An overview of RPCs at the LHC startup

    International Nuclear Information System (INIS)

    Santonico, R.

    2009-01-01

    This issue of the RPC workshop occurs in a particular historical moment which is characterized by a number of RPC systems already in data taking or in phase of advanced commissioning. In particular the startup of the Cern LHC, foreseen this year, will be a crucial test for the trigger and the time-of-flight RPC systems that have been developed for both trigger and time-of-flight by most of the LHC experiments. This offers the opportunity to evaluate the results achieved by very large systems. This introductory talk will stress some of the main achievements and problems of the last two years. The choice of the topics is somewhat arbitrary and apologies are due for the relevant results not mentioned here.

  17. Start-up of Rapsodie; Le demarrage de Rapsodie

    Energy Technology Data Exchange (ETDEWEB)

    Pontier, R [Commissariat a l' Energie Atomique, 13 - Cadarache (France). Centre d' Etudes Nucleaires

    1967-07-01

    After giving a general description of Rapsodie this report presents the conditions in which the start-up occurred and in which the tests were carried out. A chronological account is given of the operations and of the main events which occurred. The modifications made to the reactor during this period are described and a synthesis of the results obtained is presented. (author) [French] Apres avoir donne de RAPSODIE une description tres generale, ce rapport expose le cadre dans lequel ont ete effectues le demarrage et les essais de l'installation, fait un historique du deroulement des operations et des principaux evenements qui sont intervenus, indique les modifications apportees au reacteur au cours de cette periode et presente une synthese des resultats obtenus. (auteur)

  18. Reactor power system deployment and startup

    International Nuclear Information System (INIS)

    Wetch, J.R.; Nelin, C.J.; Britt, E.J.; Klein, G.; Rasor Associates, Inc., Sunnyvale, CA; California Institute of Technology, Pasadena)

    1985-01-01

    This paper addresses issues that should receive further examination in the near-term as concept selection for development of a U.S. space reactor power system is approached. The issues include: the economics, practicality and system reliability associated with transfer of nuclear spacecraft from low earth shuttle orbits to operational orbits, via chemical propulsion versus nuclear electric propulsion; possible astronaut supervised reactor and nuclear electric propulsion startup in low altitude Shuttle orbit; potential deployment methods for nuclear powered spacecraft from Shuttle; the general public safety of low altitude startup and nuclear safe and disposal orbits; the question of preferred reactor power level; and the question of frozen versus molten alkali metal coolant during launch and deployment. These issues must be considered now because they impact the SP-100 concept selection, power level selection, weight and size limits, use of deployable radiators, reliability requirements, and economics, as well as the degree of need for and the urgency of developing space reactor power systems. 5 references

  19. Test program element II blanket and shield thermal-hydraulic and thermomechanical testing, experimental facility survey

    International Nuclear Information System (INIS)

    Ware, A.G.; Longhurst, G.R.

    1981-12-01

    This report presents results of a survey conducted by EG and G Idaho to determine facilities available to conduct thermal-hydraulic and thermomechanical testing for the Department of Energy Office of Fusion Energy First Wall/Blanket/Shield Engineering Test Program. In response to EG and G queries, twelve organizations (in addition to EG and G and General Atomic) expressed interest in providing experimental facilities. A variety of methods of supplying heat is available

  20. Test program element II blanket and shield thermal-hydraulic and thermomechanical testing, experimental facility survey

    Energy Technology Data Exchange (ETDEWEB)

    Ware, A.G.; Longhurst, G.R.

    1981-12-01

    This report presents results of a survey conducted by EG and G Idaho to determine facilities available to conduct thermal-hydraulic and thermomechanical testing for the Department of Energy Office of Fusion Energy First Wall/Blanket/Shield Engineering Test Program. In response to EG and G queries, twelve organizations (in addition to EG and G and General Atomic) expressed interest in providing experimental facilities. A variety of methods of supplying heat is available.

  1. Advanced Utility Mercury-Sorbent Field-Testing Program

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Landreth

    2007-12-31

    This report summarizes the work conducted from September 1, 2003 through December 31, 2007 on the project entitled Advanced Utility Mercury-Sorbent Field-Testing Program. The project covers the testing at the Detroit Edison St. Clair Plant and the Duke Power Cliffside and Buck Stations. The St. Clair Plant used a blend of subbituminous and bituminous coal and controlled the particulate emissions by means of a cold-side ESP. The Duke Power Stations used bituminous coals and controlled their particulate emissions by means of hot-side ESPs. The testing at the Detroit Edison St. Clair Plant demonstrated that mercury sorbents could be used to achieve high mercury removal rates with low injection rates at facilities that burn subbituminous coal. A mercury removal rate of 94% was achieved at an injection rate of 3 lb/MMacf over the thirty day long-term test. Prior to this test, it was believed that the mercury in flue gas of this type would be the most difficult to capture. This is not the case. The testing at the two Duke Power Stations proved that carbon- based mercury sorbents can be used to control the mercury emissions from boilers with hot-side ESPs. It was known that plain PACs did not have any mercury capacity at elevated temperatures but that brominated B-PAC did. The mercury removal rate varies with the operation but it appears that mercury removal rates equal to or greater than 50% are achievable in facilities equipped with hot-side ESPs. As part of the program, both sorbent injection equipment and sorbent production equipment was acquired and operated. This equipment performed very well during this program. In addition, mercury instruments were acquired for this program. These instruments worked well in the flue gas at the St. Clair Plant but not as well in the flue gas at the Duke Power Stations. It is believed that the difference in the amount of oxidized mercury, more at Duke Power, was the difference in instrument performance. Much of the equipment was

  2. The US Army Foreign Comparative Test fuel cell program

    Science.gov (United States)

    Bostic, Elizabeth; Sifer, Nicholas; Bolton, Christopher; Ritter, Uli; Dubois, Terry

    The US Army RDECOM initiated a Foreign Comparative Test (FCT) Program to acquire lightweight, high-energy dense fuel cell systems from across the globe for evaluation as portable power sources in military applications. Five foreign companies, including NovArs, Smart Fuel Cell, Intelligent Energy, Ballard Power Systems, and Hydrogenics, Inc., were awarded competitive contracts under the RDECOM effort. This paper will report on the status of the program as well as the experimental results obtained from one of the units. The US Army has interests in evaluating and deploying a variety of fuel cell systems, where these systems show added value when compared to current power sources in use. For low-power applications, fuel cells utilizing high-energy dense fuels offer significant weight savings over current battery technologies. This helps reduce the load a solider must carry for longer missions. For high-power applications, the low operating signatures (acoustic and thermal) of fuel cell systems make them ideal power generators in stealth operations. Recent testing has been completed on the Smart Fuel Cell A25 system that was procured through the FCT program. The "A-25" is a direct methanol fuel cell hybrid and was evaluated as a potential candidate for soldier and sensor power applications.

  3. An Overview of the NASA Aeronautics Test Program Strategic Plan

    Science.gov (United States)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced

  4. The BNL Accelerator Test Facility and experimental program

    International Nuclear Information System (INIS)

    Ben-Zvi, I.; State Univ. of New York, Stony Brook, NY

    1992-01-01

    The Accelerator Test Facility (ATF) at BNL is a users' facility for experiments in Accelerator and Beam Physics. The ATF provides high brightness electron beams and high-power laser pulses synchronized to the electron beam, suitable for studies of new methods of high-gradient acceleration and state-of-the-art Free-Electron Lasers. The electrons are produced by a laser photocathode rf gun and accelerated to 50 MeV by two traveling wave accelerator sections. The lasers include a 10 mJ, 10 ps ND:YAG laser and a 500 mJ, 10 to 100 ps C0 2 laser. A number of users from National Laboratories, universities and industry take part in experiments at the ATF. The experimental program includes various laser acceleration schemes, Free-Electron Laser experiments and a program on the development of high-brightness electron beams. The ATF's experimental program commenced in early 1991 at an energy of about 4 MeV. The full program, with 50 MeV and the high-power laser will begin operation this year

  5. The BNL Accelerator Test Facility and experimental program

    International Nuclear Information System (INIS)

    Ben-Zvi, I.; State Univ. of New York, Stony Brook, NY

    1991-01-01

    The Accelerator Test Facility (ATF) at BNL is a users' facility for experiments in Accelerator and Beam Physics. The ATF provides high brightness electron beams and high power laser pulses synchronized to the electron beam, suitable for studies of new methods of high gradient acceleration and state of the art free electron lasers. The electrons are produced by a laser photocathode rf gun and accelerated to 50 to 100 MeV by two traveling wave accelerator sections. The lasers include a 10 mJ, 10 ps Nd:YAG laser and a 100 mJ, 10 ps CO 2 laser. A number of users from National Laboratories, universities and industry take part in experiments at the ATF. The experimental program includes various acceleration schemes, Free-Electron Laser experiments and a program on the development of high brightness electron beams. The AFT's experimental program commenced in early 1991 at an energy of about 4 MeV. The full program, with 50 MeV and the High power laser will begin operation this year. 28 refs., 4 figs

  6. Strategies, Uncertainty and Performance of Small Business Startups

    NARCIS (Netherlands)

    A.M. van Gelderen (Marco); M. Frese (Michael); A.R. Thurik (Roy)

    2000-01-01

    textabstractPersonal strategies of owners/founders of small business startups are related to performance and to environmental uncertainty. This is done using a longitudinal data set of some 50 Dutch startups. The results suggest a dynamic process between strategy and performance. A discrimination is

  7. Startup operation of Browns Ferry's 1152-MW nuclear units

    International Nuclear Information System (INIS)

    Calhoun, J.R.; Green, H.J.; Beers, R.B.

    1975-01-01

    An overview is presented of startup operation for the Browns Ferry-1 reactor, and comparisons are made with the startup of Browns Ferry-2. Included are comments on the selection of the BWR type steam supply system, reactor fueling, problems encountered, and plant availability

  8. Model checking the FlexRay startup phase

    NARCIS (Netherlands)

    Cranen, S.

    2012-01-01

    This report describes a discrete-time model of the startup phase of a FlexRay network. The startup behaviour of this network is analysed in the presence of several faults. It is shown that in certain cases a faulty node can prevent the network from communicating altogether. One previously unknown

  9. Start-up Costs, Taxes and Innovative Entrepreneurship

    NARCIS (Netherlands)

    P. Darnihamedani (Pourya); J.H. Block (Jörn); S.J.A. Hessels (Jolanda); A. Simonyan (Aram)

    2015-01-01

    markdownabstract__Abstract__ Prior research suggests that start-up costs and taxes negatively influence entry into entrepreneurship. Yet, no distinction is made regarding the type of entrepreneurship, particularly innovative versus non-innovative entrepreneurship. Start-up costs, being one-off

  10. Genetic Counselors in Startup Companies: Redefining the Genetic Counselor Role.

    Science.gov (United States)

    Rabideau, Marina M; Wong, Kenny; Gordon, Erynn S; Ryan, Lauren

    2016-08-01

    Genetic counselors (GCs) have recently begun moving into non-clinic based roles in increasing numbers. A relatively new role for GCs is working for startup companies. Startups are newly established companies in the phase of developing and researching new scalable businesses. This article explores the experiences of four GCs working at different startup companies and aims to provide resources for GCs interested in learning more about these types of roles. The article describes startup culture, including a relatively flat organizational structure, quick product iterations, and flexibility, among other unique cultural characteristics. Financial considerations are described, including how to understand and evaluate a company's financial status, along with a brief explanation of alternate forms of compensation including stock options and equity. Specifically, the article details the uncertainties and rewards of working in a fast-paced startup environment that affords opportunities to try new roles and use the genetic counseling skill set in new ways. This article aims to aid GCs in determining whether a startup environment would be a good fit, learning how to evaluate a specific startup, and understanding how to market themselves for positions at startups.

  11. Digital Marketing concept and strategy for a Finnish Start-up, Case: Sofi Filtration

    OpenAIRE

    Buda, Constantin

    2014-01-01

    The case company is a Finnish start-up company that operates in the industrial water filtration business and who aims to increase its brand awareness and generate more sales leads. The aim of this study is to provide effective and inexpensive tools for Sofi Filtration to engage its target audience and grow its business by being acknowledged as an expert in industrial water filtration. The thesis is part of the International Business Management program offered by HAAGA-HELIA University of ...

  12. US DOE Regional Test Centers Program - 2016 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Stein, Joshua [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-05-01

    The US Department of Energy’s Regional Test Center (RTC) program provides outdoor validation and bankability data for innovative solar technologies at five sites across the US representing a range of climate conditions. Data helps get new technologies to market faster and improves US industry competitiveness. Managed by Sandia National Laboratories and the National Renewable Energy Laboratory (NREL), the RTC program partners with US manufacturers of photovoltaic (PV) technologies, including modules, inverters, and balance-of-system equipment. The study is collaborative, with manufacturers (also known as RTC industry partners) and the national labs working together on a system design and validation strategy that meets a clearly defined set of performance and reliability objectives.

  13. An Airborne Parachute Compartment Test Bed for the Orion Parachute Test Program

    Science.gov (United States)

    Moore, James W.; Romero, Leah M.

    2013-01-01

    The test program developing parachutes for the Orion/MPCV includes drop tests with parachutes deployed from an Orion-like parachute compartment at a wide range of dynamic pressures. Aircraft and altitude constraints precluded the use of an Orion boilerplate capsule for several test points. Therefore, a dart-shaped test vehicle with a hi-fidelity mock-up of the Orion parachute compartment has been developed. The available aircraft options imposed constraints on the test vehicle development and concept of operations. Delivery of this test vehicle to the desired velocity, altitude, and orientation required for the test is a di cult problem involving multiple engineering disciplines. This paper describes the development of the test technique. The engineering challenges include extraction from an aircraft, reposition of the extraction parachute, and mid-air separation of two vehicles, neither of which has an active attitude control system. The desired separation behavior is achieved by precisely controlling the release point using on-board monitoring of the motion. The design of the test vehicle is also described. The trajectory simulations and other analyses used to develop this technique and predict the behavior of the test vehicle are reviewed in detail. The application of the technique on several successful drop tests is summarized.

  14. Seismic II over I Drop Test Program results and interpretation

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, B.

    1993-03-01

    The consequences of non-seismically qualified (Category 2) objects falling and striking essential seismically qualified (Category 1) objects has always been a significant, yet analytically difficult problem, particularly in evaluating the potential damage to equipment that may result from earthquakes. Analytical solutions for impact problems are conservative and available for mostly simple configurations. In a nuclear facility, the {open_quotes}sources{close_quotes} and {open_quotes}targets{close_quotes} requiring evaluation are frequently irregular in shape and configuration, making calculations and computer modeling difficult. Few industry or regulatory rules are available on this topic even though it is a source of considerable construction upgrade costs. A drop test program was recently conducted to develop a more accurate understanding of the consequences of seismic interactions. The resulting data can be used as a means to improve the judgment of seismic qualification engineers performing interaction evaluations and to develop realistic design criteria for seismic interactions. Impact tests on various combinations of sources and targets commonly found in one Savannah River Site (SRS) nuclear facility were performed by dropping the sources from various heights onto the targets. This report summarizes results of the Drop Test Program. Force and acceleration time history data are presented as well as general observations on the overall ruggedness of various targets when subjected to impacts from different types of sources.

  15. Seismic II over I Drop Test Program results and interpretation

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, B.

    1993-03-01

    The consequences of non-seismically qualified (Category 2) objects falling and striking essential seismically qualified (Category 1) objects has always been a significant, yet analytically difficult problem, particularly in evaluating the potential damage to equipment that may result from earthquakes. Analytical solutions for impact problems are conservative and available for mostly simple configurations. In a nuclear facility, the [open quotes]sources[close quotes] and [open quotes]targets[close quotes] requiring evaluation are frequently irregular in shape and configuration, making calculations and computer modeling difficult. Few industry or regulatory rules are available on this topic even though it is a source of considerable construction upgrade costs. A drop test program was recently conducted to develop a more accurate understanding of the consequences of seismic interactions. The resulting data can be used as a means to improve the judgment of seismic qualification engineers performing interaction evaluations and to develop realistic design criteria for seismic interactions. Impact tests on various combinations of sources and targets commonly found in one Savannah River Site (SRS) nuclear facility were performed by dropping the sources from various heights onto the targets. This report summarizes results of the Drop Test Program. Force and acceleration time history data are presented as well as general observations on the overall ruggedness of various targets when subjected to impacts from different types of sources.

  16. Seismic II over I Drop Test Program results and interpretation

    International Nuclear Information System (INIS)

    Thomas, B.

    1993-03-01

    The consequences of non-seismically qualified (Category 2) objects falling and striking essential seismically qualified (Category 1) objects has always been a significant, yet analytically difficult problem, particularly in evaluating the potential damage to equipment that may result from earthquakes. Analytical solutions for impact problems are conservative and available for mostly simple configurations. In a nuclear facility, the open-quotes sourcesclose quotes and open-quotes targetsclose quotes requiring evaluation are frequently irregular in shape and configuration, making calculations and computer modeling difficult. Few industry or regulatory rules are available on this topic even though it is a source of considerable construction upgrade costs. A drop test program was recently conducted to develop a more accurate understanding of the consequences of seismic interactions. The resulting data can be used as a means to improve the judgment of seismic qualification engineers performing interaction evaluations and to develop realistic design criteria for seismic interactions. Impact tests on various combinations of sources and targets commonly found in one Savannah River Site (SRS) nuclear facility were performed by dropping the sources from various heights onto the targets. This report summarizes results of the Drop Test Program. Force and acceleration time history data are presented as well as general observations on the overall ruggedness of various targets when subjected to impacts from different types of sources

  17. New Solutions to the Funding Dilemma of Technology Startups

    Directory of Open Access Journals (Sweden)

    Ali Kousari

    2011-05-01

    Full Text Available This article explores the current funding challenges facing technology startups and describes new models based on smaller investments and collective action. First, the advantages and disadvantages of traditional startup funding models are presented, with an emphasis on venture capital and angel investment. Next, an overview of existing seed funds, or seed accelerators, shows how entrepreneurs can leverage this approach to access subsequent rounds of funding and create successful ventures. Then, an overview of crowd funding is provided, including examples of companies that have adopted this approach to funding startups and their founders. Finally, the article presents the basis of a new approach that uses crowd funding as means of attracting investors to collectives. In these business ecosystems, startups are exposed to less risk and investors can benefit from attractive returns by investing in these promising startups.

  18. Ignited tokamak devices with ohmic-heating dominated startup

    International Nuclear Information System (INIS)

    Cohn, D.R.; Bromberg, L.; Jassby, D.L.

    1986-01-01

    Startup of tokamaks such that the auxiliary heating power is significantly less than the ohmic heating power at all times during heating to ignition can be referred to as ''Ohmic-heating dominated startup.'' Operation in this mode could increase the certainty of heating to ignition since energy confinement during startup may be described by present scaling laws for ohmic heating. It could also reduce substantially the auxiliary heating power (the required power may be quite large for auxiliary-heating dominated startup). These advantages might be realized without the potentially demanding requirements for pure ohmic heating to ignition. In this paper the authors discuss the requirements for ohmic-heating dominated startup and present illustrative design parameters for compact experiment ignition devices that use high performance copper magnets

  19. Startup analysis for a high temperature gas loaded heat pipe

    Science.gov (United States)

    Sockol, P. M.

    1973-01-01

    A model for the rapid startup of a high-temperature gas-loaded heat pipe is presented. A two-dimensional diffusion analysis is used to determine the rate of energy transport by the vapor between the hot and cold zones of the pipe. The vapor transport rate is then incorporated in a simple thermal model of the startup of a radiation-cooled heat pipe. Numerical results for an argon-lithium system show that radial diffusion to the cold wall can produce large vapor flow rates during a rapid startup. The results also show that startup is not initiated until the vapor pressure p sub v in the hot zone reaches a precise value proportional to the initial gas pressure p sub i. Through proper choice of p sub i, startup can be delayed until p sub v is large enough to support a heat-transfer rate sufficient to overcome a thermal load on the heat pipe.

  20. The RERTR [Reduced Enrichment Research and Test Reactor] program:

    International Nuclear Information System (INIS)

    Travelli, A.

    1987-01-01

    The progress of the Reduced Enrichment Research and Test Reactor (RERTR) program is described. After a brief summary of the results which the RERTR program, in collaboration with its many international partners, had achieved by the end of 1986, the activities, results and new developments which ocurred in 1987 are reviewed. Irradiation of the second miniplate series, concentrating on U 3 Si 2 -Al and U 3 Si-Al fuels was completed and postirradiation examinations were performed on many of its miniplates. The whole-core ORR demonstration with U 3 Si 2 -Al fuel at 4.8 g U/cm 3 was completed at the end of March with excellent results and with 29 elements estimated to have reached at least 40 % average burnup. Good progress was made in the area of LEU usage for the production of fission 99 Mo, and in the coordination of safety evaluations related to LEU conversions of U.S. university reactors. Planned activities include testing and demonstrating advanced fuels intended to allow use of reduced enrichment uranium in very-high-performance reactors. Two candidate fuels are U 3 Si-Al with 19.75 % enrichment and U 3 Si 2 -Al with 45 % enrichment. Demonstration of these fuels will include irradiation of full-size elements and, possibly, a full-core demonstration. Achievement of the final program goals is still projected for 1990. This progress could not have been possible without the close international cooperation which has existed from the beginning, and which is essential to the ultimate success of the RERTR program. (Author)

  1. Material testing facilities and programs for plasma-facing component testing

    Science.gov (United States)

    Linsmeier, Ch.; Unterberg, B.; Coenen, J. W.; Doerner, R. P.; Greuner, H.; Kreter, A.; Linke, J.; Maier, H.

    2017-09-01

    Component development for operation in a large-scale fusion device requires thorough testing and qualification for the intended operational conditions. In particular environments are necessary which are comparable to the real operation conditions, allowing at the same time for in situ/in vacuo diagnostics and flexible operation, even beyond design limits during the testing. Various electron and neutral particle devices provide the capabilities for high heat load tests, suited for material samples and components from lab-scale dimensions up to full-size parts, containing toxic materials like beryllium, and being activated by neutron irradiation. To simulate the conditions specific to a fusion plasma both at the first wall and in the divertor of fusion devices, linear plasma devices allow for a test of erosion and hydrogen isotope recycling behavior under well-defined and controlled conditions. Finally, the complex conditions in a fusion device (including the effects caused by magnetic fields) are exploited for component and material tests by exposing test mock-ups or material samples to a fusion plasma by manipulator systems. They allow for easy exchange of test pieces in a tokamak or stellarator device, without opening the vessel. Such a chain of test devices and qualification procedures is required for the development of plasma-facing components which then can be successfully operated in future fusion power devices. The various available as well as newly planned devices and test stands, together with their specific capabilities, are presented in this manuscript. Results from experimental programs on test facilities illustrate their significance for the qualification of plasma-facing materials and components. An extended set of references provides access to the current status of material and component testing capabilities in the international fusion programs.

  2. Conceptual design of the IFMIF Start-Up monitoring module

    Energy Technology Data Exchange (ETDEWEB)

    Gouat, Philippe, E-mail: philippe.gouat@sckcen.be [SCK-CEN – The Belgian Nuclear Research Centre, Boeretang 200, B-2400 Mol (Belgium); Leysen, Willem; Goussarov, Andrei; Galledou, Papa Sally [SCK-CEN – The Belgian Nuclear Research Centre, Boeretang 200, B-2400 Mol (Belgium); Rapisarda, David; Mota, Fernando; Garcia, Angela [CIEMAT – Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas, Avda. Complutense 40, 28040 Madrid (Spain)

    2013-10-15

    Highlights: ► IFMIF test module conceptual design. ► IFMIF test module foreseen instrumentation. ► Cerenkov photon flux monitor. -- Abstract: The preliminary engineering design of the test facilities, including the various test modules to be used in the IFMIF plant is a part of the IFMIF/EVEDA (Engineering Validation and Engineering Design Activities) project from the Broader Approach to fusion. One presents the current status of the conceptual development of the IFMIF Start-Up Monitoring Module, a dedicated device used in the IFMIF test cell during the commissioning phase of the installation, in order to completely characterise the irradiation conditions behind the target on which the beam of deuterons will be focused. This STUMM embarks a lot of instrumentation to precisely characterise the neutron field, the nuclear heating and the temperatures in the test cell. One briefly describes the measuring instruments (including a specific radiation flux monitor under development), the possible layouts and the possible positioning. One also defines which types of measurements are expected by this especially dedicated commissioning module.

  3. Impeller radial force evolution in a large double-suction centrifugal pump during startup at the shut-off condition

    Energy Technology Data Exchange (ETDEWEB)

    Zou, Zhichao [College of Water Resources and Civil Engineering, China Agricultural University, Beijing 100083 (China); Wang, Fujun, E-mail: wangfj@cau.edu.cn [College of Water Resources and Civil Engineering, China Agricultural University, Beijing 100083 (China); Beijing Engineering Research Center of Safety and Energy Saving Technology for Water Supply Network System, China Agricultural University, Beijing 100083 (China); Yao, Zhifeng [College of Water Resources and Civil Engineering, China Agricultural University, Beijing 100083 (China); Beijing Engineering Research Center of Safety and Energy Saving Technology for Water Supply Network System, China Agricultural University, Beijing 100083 (China); Tao, Ran [College of Water Resources and Civil Engineering, China Agricultural University, Beijing 100083 (China); Xiao, Ruofu [College of Water Resources and Civil Engineering, China Agricultural University, Beijing 100083 (China); Beijing Engineering Research Center of Safety and Energy Saving Technology for Water Supply Network System, China Agricultural University, Beijing 100083 (China); Li, Huaicheng [Shanghai Liancheng (Group) Co., Ltd., Shanghai 201812 (China)

    2016-12-15

    Highlights: • Conclude the characteristics of transient radial force in the startup process for a large double-suction centrifugal pump. • The overall direction of the radial force during startup process is also confirmed. • A formula used to calculate the transient radial force during startup process is proposed. • A relationship between radial force variation and axial vortex development in blade channel during the startup process is established. The mechanism of the radial force evolution is revealed. - Abstract: Double-suction centrifugal pumps play an important role in the main feedwater systems of nuclear power plant. The impeller radial force in a centrifugal pump varies dramatically during startup at the shut-off condition. In this study, the startup process of a large double-suction centrifugal pump is investigated using CFD. During testing, the impeller speed is accelerated from zero to its rated speed in 1.0 s (marked as t{sub 0}) and is then maintained at the rated speed. The results show that the radial force increase lags behind the impeller speed increase. At 0–0.4t{sub 0}, the radial force is small (approaching zero). At 0.4–1.4t{sub 0}, the radial force increases rapidly. After 1.4t{sub 0}, the average radial force stabilizes and reaches its maximum value of 55,619 N. The observed maximum radial force value during startup is approximately nine times as high as the radial force under rated condition. During startup, the overall radial force direction is proximate to the radial line located 25° from the volute tongue along circumferential direction. A transient radial force formula is proposed to evaluate the changes in radial force during startup. The streamline distribution in impeller passages and the impeller outlet pressure profile varying over time are produced. The relationship between radial force evolution and the varying axial-to-spiral vortex structure is analyzed. The radial force change mechanism is revealed. This research

  4. Impeller radial force evolution in a large double-suction centrifugal pump during startup at the shut-off condition

    International Nuclear Information System (INIS)

    Zou, Zhichao; Wang, Fujun; Yao, Zhifeng; Tao, Ran; Xiao, Ruofu; Li, Huaicheng

    2016-01-01

    Highlights: • Conclude the characteristics of transient radial force in the startup process for a large double-suction centrifugal pump. • The overall direction of the radial force during startup process is also confirmed. • A formula used to calculate the transient radial force during startup process is proposed. • A relationship between radial force variation and axial vortex development in blade channel during the startup process is established. The mechanism of the radial force evolution is revealed. - Abstract: Double-suction centrifugal pumps play an important role in the main feedwater systems of nuclear power plant. The impeller radial force in a centrifugal pump varies dramatically during startup at the shut-off condition. In this study, the startup process of a large double-suction centrifugal pump is investigated using CFD. During testing, the impeller speed is accelerated from zero to its rated speed in 1.0 s (marked as t_0) and is then maintained at the rated speed. The results show that the radial force increase lags behind the impeller speed increase. At 0–0.4t_0, the radial force is small (approaching zero). At 0.4–1.4t_0, the radial force increases rapidly. After 1.4t_0, the average radial force stabilizes and reaches its maximum value of 55,619 N. The observed maximum radial force value during startup is approximately nine times as high as the radial force under rated condition. During startup, the overall radial force direction is proximate to the radial line located 25° from the volute tongue along circumferential direction. A transient radial force formula is proposed to evaluate the changes in radial force during startup. The streamline distribution in impeller passages and the impeller outlet pressure profile varying over time are produced. The relationship between radial force evolution and the varying axial-to-spiral vortex structure is analyzed. The radial force change mechanism is revealed. This research provides a scientific

  5. Preliminary irradiation test results from the Yankee Atomic Electric Company reactor vessel test irradiation program

    International Nuclear Information System (INIS)

    Biemiller, E.C.; Fyfitch, S.; Campbell, C.A.

    1993-01-01

    The Yankee Atomic Electric Company test irradiation program was implemented to characterize the irradiation response of representative Yankee Rowe reactor vessel beltline plate materials and to remove uncertainties in the analysis of existing irradiation data on the Yankee Rowe reactor vessel steel. Plate materials each containing 0.24 w/o copper, but different nickel contents at 0.63 w/o and 0.19 w/o, were heat treated to simulate the Yankee vessel heat treatment (austenitized at 1800 deg F) and to simulate Regulatory Guide 1.99 database materials (austenitized at 1600 deg. F). These heat treatments produced different microstructures so the effect of microstructure on irradiation damage sensitivity could be tested. Because the nickel content of the test plates varied and the copper level was constant, the effect of nickel on irradiation embrittlement was also tested. Correlation monitor material, HSST-02, was included in the program to benchmark the Ford Nuclear Reactor (U. of Michigan Test Reactor) which had never been used for this type of irradiation program. Materials taken from plate surface locations (vs. 1/4T) were included to test whether or not the improved toughness properties of the plate surface layer, resulting from the rapid quench, is maintained after irradiation. If the improved properties are maintained, pressurized thermal shock calculations could utilize this margin. Finally, for one experiment, irradiations were conducted at two irradiation temperatures (500 deg. F and 550 deg. F) to determine the effect of irradiation temperature on embrittlement. The preliminary results of the irradiation program show an increase in T 30 shift of 69 deg. F for a decrease in irradiation temperature of 50 deg. F. The results suggest that for nickel bearing steels, the superior toughness of plate surface material is maintained after irradiation and for the copper content tested, nickel had no apparent effect on irradiation response. No apparent microstructure

  6. Plutonium immobilization program - Cold pour Phase 1 test results

    International Nuclear Information System (INIS)

    Hamilton, L.

    2000-01-01

    The Plutonium Immobilization Project will disposition excess weapons grade plutonium. It uses the can-in-canister approach that involves placing plutonium-ceramic pucks in sealed cans that are then placed into Defense Waste Processing Facility canisters. These canisters are subsequently filled with high-level radioactive waste glass. This process puts the plutonium in a stable form and makes it unattractive for reuse. A cold (non-radioactive) glass pour program was performed to develop and verify the baseline design for the canister and internal hardware. This paper describes the Phase 1 scoping test results

  7. Testing program for burning plasma experiment vacuum vessel bolted joint

    International Nuclear Information System (INIS)

    Hsueh, P.K.; Khan, M.Z.; Swanson, J.; Feng, T.; Dinkevich, S.; Warren, J.

    1992-01-01

    As presently designed, the Burning Plasma Experiment vacuum vessel will be segmentally fabricated and assembled by bolted joints in the field. Due to geometry constraints, most of the bolted joints have significant eccentricity which causes the joint behavior to be sensitive to joint clamping forces. Experience indicates that as a result of this eccentricity, the joint will tend to open at the side closest to the applied load with the extent of the opening being dependent on the initial preload. In this paper analytical models coupled with a confirmatory testing program are developed to investigate and predict the non-linear behavior of the vacuum vessel bolted joint

  8. Plutonium Immobilization Program - Cold pour Phase 1 test results

    International Nuclear Information System (INIS)

    Hamilton, L.

    2000-01-01

    The Plutonium Immobilization Project will disposition excess weapons grade plutonium. It uses the can-in-canister approach that involves placing plutonium-ceramic pucks in sealed cans that are then placed into Defense Waste Processing Facility canisters. These canisters are subsequently filled with high-level radioactive waste glass. This process puts the plutonium in a stable form and makes it unattractive for reuse. A cold (non-radioactive) glass pour program was performed to develop and verify the baseline design for the canister and internal hardware. This paper describes the Phase 1 scoping test results

  9. Cover gas seals: FFTF-LMFBR seal test program

    International Nuclear Information System (INIS)

    Kurzeka, W.; Oliva, R.; Welch, T.S.; Shimazaki, T.

    1974-01-01

    The objectives of this program are to: (1) conduct static and dynamic tests to demonstrate or determine the mechanical performance of full-size (cross section) FFTF fuel transfer machine and reactor vessel head seals intended for use in a sodium vapor-inert gas environment, (2) demonstrate that these FFTF seals or new seal configurations provide acceptable fission product and cover gas retention capabilities at Clinch River Breeder Reactor Plant (CRBRP) operating environmental conditions other than radiation, and (3) develop improved seals and seal technology for the CRBRP to support the national objective to reduce all atmospheric contaminations to low levels

  10. Safety Test Program Summary SNAP 19 Pioneer Heat Source Safety Program

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1971-07-01

    Sixteen heat source assemblies have been tested in support of the SNAP 19 Pioneer Safety Test Program. Seven were subjected to simulated reentry heating in various plasma arc facilities followed by impact on earth or granite. Six assemblies were tested under abort accident conditions of overpressure, shrapnel impact, and solid and liquid propellant fires. Three capsules were hot impacted under Transit capsule impact conditions to verify comparability of test results between the two similar capsule designs, thus utilizing both Pioneer and Transit Safety Test results to support the Safety Analysis Report for Pioneer. The tests have shown the fuel is contained under all nominal accident environments with the exception of minor capsule cracks under severe impact and solid fire environments. No catastrophic capsule failures occurred in this test which would release large quantities of fuel. In no test was fuel visible to the eye following impact or fire. Breached capsules were defined as those which exhibit thoria contamination on its surface following a test, or one which exhibited visible cracks in the post test metallographic analyses.

  11. Experimental Program for the CLIC test facility 3 test beam line

    CERN Document Server

    Adli, E; Dobert, S; Olvegaard, M; Schulte, D; Syratchev, I; Lillestol, Reidar

    2010-01-01

    The CLIC Test Facility 3 Test Beam Line is the first prototype for the CLIC drive beam decelerator. Stable transport of the drive beam under deceleration is a mandatory component in the CLIC two-beam scheme. In the Test Beam Line more than 50% of the total energy will be extracted from a 150 MeV, 28 A electron drive beam, by the use of 16 power extraction and transfer structures. A number of experiments are foreseen to investigate the drive beam characteristics under deceleration in the Test Beam Line, including beam stability, beam blow up and the efficiency of the power extraction. General benchmarking of decelerator simulation and theory studies will also be performed. Specially designed instrumentation including precision BPMs, loss monitors and a time-resolved spectrometer dump will be used for the experiments. This paper describes the experimental program foreseen for the Test Beam Line, including the relevance of the results for the CLIC decelerator studies.

  12. Neutron Tests at the Start-Up of EDF1; Les essais neutroniques au demarrage du reacteur EDF1; Nejtronnye izmereniya pri puske reaktora EDF1; Ensayos neutronicos efectuados durante la puesta en marcha del reactor EDF1

    Energy Technology Data Exchange (ETDEWEB)

    Teste du Bailler, A. [Centre d' Etudes Nucleaires de Saclay (France); Janin, R. [Electricite de France, Paris (France)

    1963-10-15

    A series of neutron measurements, for which the principal experimental methods perfected at the Marcoule reactors were used, was carried out at the start-up of EDF1. The measurements were designed mainly to determine the efficiency of the control rods at different depths of insertion. From them a rod-withdrawal configuration was derived which allowed full-power operation without infringing certain limitations on cladding and gas temperatures. At the same time flux measurements were made for different shim-rod positions and different absorber loadings in certain channels. These measurements based on preliminary two-dimensional calculations, were obtained by activation of point detectors,using the standard technique of air poisoning. At certain temperature plateaus (up to 140{sup o}C), measurements of temperature coefficients and control-rod efficiency were made. Spectrum index measurements were carried out at the same time by activation of appropriate detectors (U, Pu, Lu, Mn, In, Au). The oscillation technique was used to measure the efficiency of certain shim rods. Finally, fast-neutron measurements were made in connection with studies of shielding and graphite damage. (author) [French] Une serie de mesures neutroniques utilisant les principales methodes experimentales mises au point sur les reacteurs de Marcoule a ete effectuee au cours du demarrage d'EDF1. Les mesures portent essentiellement sur l 'efficacite des barres de controle a differents enfoncements. On en deduit une configuration de montee des barres permettant d'obtenir la pleine puissance en respectant certaines limitations sur les temperatures de gaines et de gaz. Parallelement des mesures de flux ont ete faites pour differentes positions des barres de compensation et pour divers chargements d'absorbants dans certains canaux, suivant des calculs previsionnels a deux dimensions. Ces mesures sont obtenues par activation de detecteurs ponctuels, au moyen de la technique classique par empoisonnement a l

  13. Alternatives to L startup: new production reactor

    International Nuclear Information System (INIS)

    Hostetler, D.E.

    1983-01-01

    An alternative to renewed operation of L Reactor for increased production of nuclear materials would be the construction and operation of a New Production Reactor (NPR). This report describes a conceptual design for a low temperature heavy water reactor with no electricity generation (LTHWR-NE) to be built as a new production reactor at the Savannah River Plant (SRP). The reactor design is based on the proven SRP reactor design with enhancements and state-of-the-art equipment. Aluminum cladding temperatures would be the same as with current operations. The power and productivity of the new reactor would be greater than L Reactor by about 30%. However, the estimated time from authorization to startup is 10 years. Thus an NPR could not contribute to material production until late 1993 at the earliest

  14. Start-up Strategy for Continuous Bioreactors

    Directory of Open Access Journals (Sweden)

    A.C. da Costa

    1997-06-01

    Full Text Available Abstract - The start-up of continuous bioreactors is solved as an optimal control problem. The choice of the dilution rate as the control variable reduces the dimension of the system by making the use of the global balance equation unnecessary for the solution of the optimization problem. Therefore, for systems described by four or less mass balance equations, it is always possible to obtain an analytical expression for the singular arc as a function of only the state variables. The steady state conditions are shown to satisfy the singular arc expression and, based on this knowledge, a feeding strategy is proposed which leads the reactor from an initial state to the steady state of maximum productivity

  15. Building Dynamic Capabilities in Web Startups: An Empirical Study of Norwegian Web Startups

    OpenAIRE

    Sahlen, Martin Abelson; Gran-Jansen, Sigurd; Rygh, Mathias

    2014-01-01

    Purpose: This thesis explores how web startups operating in a crowded, fast-moving and highly competitive marketplace can gain competitive advantage through building dynamic capabilities and what these capabilities consist of. Design/methodology/approach: Firstly, insight was obtained through reviewing key themes within classic resource based theory and entrepreneurship theory. Newer empirical research on entrepreneurial success factors, as well as popular science and advice given by expert w...

  16. Nevada Test Site Radiation Protection Program - Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Radiological Control Managers' Council

    2008-06-01

    Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection,' establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (on-site or off-site) U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration off-site projects. This NTS RPP promulgates the radiation protection standards, limits, and program requirements for occupational exposure to ionizing radiation resulting from NNSA/NSO activities at the NTS and other operational areas as stated in 10 CFR 835.1(a). NNSA/NSO activities (including design, construction, operation, and decommissioning) within the scope of this RPP may result in occupational exposures to radiation or radioactive material. Therefore, a system of control is implemented through specific references to the site-specific NV/YMP RCM. This system of control is intended to ensure that the following criteria are met: (1) occupational exposures are maintained as low as reasonably achievable (ALARA), (2) DOE's limiting values are not exceeded, (3) employees are aware of and are prepared to cope with emergency conditions, and (4) employees are not inadvertently exposed to radiation or radioactive material.

  17. Nevada Test Site Radiation Protection Program - Revision 1

    International Nuclear Information System (INIS)

    Nevada Test Site Radiological Control Managers' Council

    2008-01-01

    Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection,' establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (on-site or off-site) U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration off-site projects. This NTS RPP promulgates the radiation protection standards, limits, and program requirements for occupational exposure to ionizing radiation resulting from NNSA/NSO activities at the NTS and other operational areas as stated in 10 CFR 835.1(a). NNSA/NSO activities (including design, construction, operation, and decommissioning) within the scope of this RPP may result in occupational exposures to radiation or radioactive material. Therefore, a system of control is implemented through specific references to the site-specific NV/YMP RCM. This system of control is intended to ensure that the following criteria are met: (1) occupational exposures are maintained as low as reasonably achievable (ALARA), (2) DOE's limiting values are not exceeded, (3) employees are aware of and are prepared to cope with emergency conditions, and (4) employees are not inadvertently exposed to radiation or radioactive material

  18. Radiation damage calculations for the APT materials test program

    International Nuclear Information System (INIS)

    Corzine, R.K.; Wechsler, M.S.; Dudziak, D.J.; Ferguson, P.D.; James, M.R.

    1999-01-01

    A materials irradiation was performed at the Los Alamos Neutron Science Center (LANSCE) in the fall of 1996 and spring of 1997 in support of the Accelerator Production of Tritium (APT) program. Testing of the irradiated materials is underway. In the proposed APT design, materials in the target and blanket are to be exposed to protons and neutrons over a wide range of energies. The irradiation and testing program was undertaken to enlarge the very limited direct knowledge presently available of the effects of medium-energy protons (∼1 GeV) on the properties of engineering materials. APT candidate materials were placed in or near the LANSCE accelerator 800-MeV, 1-mA proton beam and received roughly the same proton current density in the center of the beam as would be the case for the APT facility. As a result, the proton fluences achieved in the irradiation were expected to approach the APT prototypic full-power-year values. To predict accurately the performance of materials in APT, radiation damage parameters for the materials experiment must be determined. By modeling the experiment, calculations for atomic displacement, helium and hydrogen cross sections and for proton and neutron fluences were done for representative samples in the 17A, 18A, and 18C areas. The LAHET code system (LCS) was used to model the irradiation program, LAHET 2.82 within LCS transports protons > 1 MeV, and neutrons >20 MeV. A modified version of MCNP for use in LCS, HMCNP 4A, was employed to tally neutrons of energies <20 MeV

  19. Total dose and dose-rate effects on start-up current in anti-fuse FPGA

    International Nuclear Information System (INIS)

    Wang, J.; Wong, W.; McCollum, J.; Cronquist, B.; Katz, R.; Kleyner, I.; Kleyner, F.

    1999-01-01

    Radiation enhanced start-up current (RESC) in an anti-fuse FPGA, A1280A, is thoroughly investigated and a comprehensive transistor-level mechanism is proposed. Low dose-rate testing, appropriate for civilian space applications, and annealing at room temperature shows RESC to be negligible for the lot of parts tested with a fixed power supply slew rate. (authors)

  20. A Study of Minimum Competency Testing Programs. Final Summary and Analysis Report.

    Science.gov (United States)

    Gorth, William Phillip; Perkins, Marcy R.

    To portray the status of minimum competency testing programs nationwide; as of June 30, 1979, on-site visits were conducted with directors of all 31 state programs and 20 local district programs. Most programs were developed since 1976; 14 state and 13 local programs are fully implemented. The state board of education mandated 16 state programs;…

  1. Preliminary irradiation test results from the Yankee Atomic Electric Company reactor vessel test irradiation program

    International Nuclear Information System (INIS)

    Biemiller, E.C.; Fyfitch, Stephen; Campbell, C.A.

    1994-01-01

    The Yankee Atomic Electric Company test irradiation program was implemented to characterize the irradiation response of representative Yankee Rowe reactor vessel beltline plate materials and to remove uncertainties in the analysis of existing irradiation data on the Yankee Rowe reactor vessel steel. Plate materials each containing 0.24 w/o copper, but different nickel contents at 0.63 w/o and 0.19 w/o, were heat treated to simulate the Yankee vessel heat treatment (austenitized at 982 o C (1800 o F)) and to simulate Regulatory Guide 1.99 database materials (austenitized at 871 o C (1600 o F)). These heat treatments produced different microstructures so the effect of microstructure on irradiation damage sensitivity could be tested. Because the nickel content of the test plates varied and the copper level was constant, the effect of nickel on irradiation embrittlement was also tested. Correlation monitor material, HSST-02, was included in the program to benchmark the Ford Nuclear Reactor (University of Michigan Test Reactor) which had never been used before for this type of irradiation program. Materials taken from plate surface locations (versus 1/4 T) were included to test whether or not the improved toughness properties of the plate surface layer, resulting from the rapid quench, are maintained after irradiation. If the improved properties are maintained, pressurized thermal shock calculations could utilize this margin. Finally, for one experiment, irradiations were conducted at two irradiation temperatures (260 o C and 288 o C) to determine the effect of irradiation temperature on embrittlement. (Author)

  2. Irradiation testing of miniature fuel plates for the RERTR program

    Energy Technology Data Exchange (ETDEWEB)

    Senn, R L; Martin, M M [Oak Ridge National Laboratory, Oak Ridge, TN 37830 (United States)

    1983-08-01

    An irradiation test facility, which provides a test bed for irradiating a variety of miniature fuel plates miniplates) for the Reduced Enrichment Research and Test Reactors (RERTR) program, has been placed into operation. The objective of these tests is to screen various candidate fuel materials as to their suitability for replacing the highly enriched uranium fuel materials currently used by the world's test and research reactors with a lower enrichment fuel material, without significantly degrading reactor operating characteristics and power levels. The use of low uranium enrichment of about 20% {sup 235}U in place of highly enriched fuel for these reactors would reduce the potential for {sup 235}U diversion. Fuel materials currently being evaluated in this first phase of these screening tests include aluminum-base dispersion-type fuel plates with fuel cores of 1) high uranium content U{sup 3}){sup 8}-Al being developed by ORNL, 2) high uranium content UAI{sub x}-Al being developed by EG and G Idaho, Inc., and 3) very high uranium content U{sub 3}Si-Al- being developed by ANL. The miniplates are 115-mm long by 50-mm wide with overall plate thicknesses of 1.27 or 1.52 mm. The fuel core dimensions vary according to overall plate thicknesses with a minimal clad thickness requirement of 0.20 mm. Sixty such miniplates (thirty of each thickness) can be irradiated in one test facility. The irradiation test facility, designated as HFED-1 is operating in core position E-7 in the Oak Ridge Research Reactor (ORR), a 30-MW water-moderated reactor. The peak neutron flux measured for this experiment is 1.96 x 10{sup 18} neutrons m{sub -2} s{sub -1}. The various types of miniplates will achieve burnups of up to approximately 2.2x10{sup 27} fissions/m{sup 3} of fuel, which will require approximately eight full power months of irradiation. During reactor shutdown periods, the experiment is removed from the reactor, moved to a special poolside station, disassembled, and inspected

  3. 77 FR 18793 - Spectrum Sharing Innovation Test-Bed Pilot Program

    Science.gov (United States)

    2012-03-28

    .... 120322212-2212-01] Spectrum Sharing Innovation Test-Bed Pilot Program AGENCY: National Telecommunications... Innovation Test-Bed pilot program to assess whether devices employing Dynamic Spectrum Access techniques can... Spectrum Sharing Innovation Test-Bed (Test-Bed) pilot program to examine the feasibility of increased...

  4. CANMET Gasifier Liner Coupon Material Test Report

    Energy Technology Data Exchange (ETDEWEB)

    Mark Fitzsimmons; Dave Grimmett; Bryan McEnerney

    2007-01-31

    This report provides detailed test results consisting of test data and post-test inspections from Task 1 ''Cooled Liner Coupon Development and Test'' of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources--Advanced Gasification Systems Development (AGSD)''. The primary objective of this development and test program is to verify that ceramic matrix composite (CMC) liner materials planned for use in an advanced gasifier pilot plant will successfully withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) designed and fabricated the cooled liner test assembly article that was tested in a slagging gasifier at CANMET Energy Technology Center (CETC-O) in Ottawa, Ontario, Canada. The test program conducted in 2006 met the objective of operating the cooled liner test article at slagging conditions in a small scale coal gasifier at CETC-O for over the planned 100 hours. The test hardware was exposed to at least 30 high temperature excursions (including start-up and shut-down cycles) during the test program. The results of the testing has provided valuable information on gasifier startup and required cooling controls in steady state operation of future advanced gasifiers using similar liners. The test program also provided a significant amount of information in the areas of CMC materials and processing for improved capability in a gasifier environment and insight into CMC liner fabrication that will be essential for near-term advanced gasifier projects.

  5. Innovative Startup-Projects: Experience, Evaluation, Implementation Contradictions

    Directory of Open Access Journals (Sweden)

    Inshakov Maksim Olegovich

    2015-09-01

    Full Text Available Innovative companies in the conditions of global post-crisis economic recovery and increased economic activity become again a promising area for investments of large investment and venture capital funds, venture divisions of large transnational corporations, business angels and other private investors. This is confirmed by the data on the increase in the volume of venture capital market in the US and Europe and on a significant increase in the cost of the leading foreign and Russian start-up companies which are rated as of 2014 in the present article. The comparative analysis of the leading Russian and foreign start-ups showed the prevalence of companies engaged in the field of IT-Internet-Mobile and focused on the provision of various kinds of innovative services to consumers among the foreign participants of the rating. Among Russian startups-winners the companies of technological orientation (biological, medical, and “clean” technologies dominate. They reflect the increasing importance of start-ups in the innovative development of the Russian economy. Participation in such competitions and ratings is a favorable factor of promoting start-ups, increasing awareness of potential investors and consumers of start-up products. The importance of start-ups formation and the development of effective regional and national innovation systems update the studies related to the identification of the fundamental contradictions in the activities of Russian start-ups and to the development of recommendations for their resolution. The article identifies the key issues of economic, organizational, informational and marketing character causing the collapse of start-up projects in the Russian economy in modern conditions.

  6. Minimum Viable Product and the Importance of Experimentation in Technology Startups

    Directory of Open Access Journals (Sweden)

    Dobrila Rancic Moogk

    2012-03-01

    Full Text Available Entrepreneurs are often faced with limited resources in their quest to commercialize new technology. This article presents the model of a lean startup, which can be applied to an organization regardless of its size or environment. It also emphasizes the conditions of extreme uncertainty under which the commercialization of new technology is carried out. The lean startup philosophy advocates efficient use of resources by introducing a minimum viable product to the market as soon as possible in order to test its value and the entrepreneur’s growth projections. This testing is done by running experiments that examine the metrics relevant to three distinct types of the growth. These experiments bring about accelerated learning to help reduce the uncertainty that accompanies commercialization projects, thereby bringing the resulting new technology to market faster.

  7. Carboy Security Testing and Training Programs for Industrial Control Systems

    International Nuclear Information System (INIS)

    Noyes, Daniel

    2012-01-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These training vary from web-based cyber security training for control systems engineers to more advanced hands-on training that culminates with a Red Team/Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors

  8. Cyber Security Testing and Training Programs for Industrial Control Systems

    International Nuclear Information System (INIS)

    Noyes, Daniel

    2012-01-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These trainings vary from web-based cyber security trainings for control systems engineers to more advanced hands-on training that culminates with a Red Team/ Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  9. Cyber Security Testing and Training Programs for Industrial Control Systems

    Energy Technology Data Exchange (ETDEWEB)

    Daniel Noyes

    2012-03-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These trainings vary from web-based cyber security trainings for control systems engineers to more advanced hands-on training that culminates with a Red Team/ Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  10. Comparison of Statistical Methods for Detector Testing Programs

    Energy Technology Data Exchange (ETDEWEB)

    Rennie, John Alan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Abhold, Mark [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-10-14

    A typical goal for any detector testing program is to ascertain not only the performance of the detector systems under test, but also the confidence that systems accepted using that testing program’s acceptance criteria will exceed a minimum acceptable performance (which is usually expressed as the minimum acceptable success probability, p). A similar problem often arises in statistics, where we would like to ascertain the fraction, p, of a population of items that possess a property that may take one of two possible values. Typically, the problem is approached by drawing a fixed sample of size n, with the number of items out of n that possess the desired property, x, being termed successes. The sample mean gives an estimate of the population mean p ≈ x/n, although usually it is desirable to accompany such an estimate with a statement concerning the range within which p may fall and the confidence associated with that range. Procedures for establishing such ranges and confidence limits are described in detail by Clopper, Brown, and Agresti for two-sided symmetric confidence intervals.

  11. Interpretation of a seismic test of the IPIRG2 program

    International Nuclear Information System (INIS)

    Blay, N.; Gantenbein, F.

    1995-01-01

    In the framework of the linear and non linear analysis of PWR cracked pipes under seismic loading, the calculations of the 1.2 seismic test of the important IPIRG2 program (International Piping Integrity Research Group) was undertaken. This seismic test was performed on a pipe with a surface crack and loaded by an imposed displacement. A low level and a high level of excitation were applied to the pipe. The calculations are made with a global model including a through wall crack pipe finite element. The modal analysis made for the non-cracked pipe and the real geometrical characteristics gives a first frequency of the pipe with pressure and temperature in good agreement with the test. For the cracked pipe, the first frequency decrease is less than 0.5%. The low level response was calculated with a linear model by modal combination in order to study the importance of the both inertial and differential displacement responses in the total response. For both configurations, non-cracked and cracked, the inertial contribution to the moment at the crack location is approximately equal to 80% of the total moment. For the linear behaviour, the influence of the crack appears weak. The non linear calculations are performed with the equivalent crack previously defined up to penetration. To study the behaviour after penetration, various hypothesis for the crack size are taken. (authors). 3 refs., 6 figs., 4 tabs

  12. Testing New Programming Paradigms with NAS Parallel Benchmarks

    Science.gov (United States)

    Jin, H.; Frumkin, M.; Schultz, M.; Yan, J.

    2000-01-01

    Over the past decade, high performance computing has evolved rapidly, not only in hardware architectures but also with increasing complexity of real applications. Technologies have been developing to aim at scaling up to thousands of processors on both distributed and shared memory systems. Development of parallel programs on these computers is always a challenging task. Today, writing parallel programs with message passing (e.g. MPI) is the most popular way of achieving scalability and high performance. However, writing message passing programs is difficult and error prone. Recent years new effort has been made in defining new parallel programming paradigms. The best examples are: HPF (based on data parallelism) and OpenMP (based on shared memory parallelism). Both provide simple and clear extensions to sequential programs, thus greatly simplify the tedious tasks encountered in writing message passing programs. HPF is independent of memory hierarchy, however, due to the immaturity of compiler technology its performance is still questionable. Although use of parallel compiler directives is not new, OpenMP offers a portable solution in the shared-memory domain. Another important development involves the tremendous progress in the internet and its associated technology. Although still in its infancy, Java promisses portability in a heterogeneous environment and offers possibility to "compile once and run anywhere." In light of testing these new technologies, we implemented new parallel versions of the NAS Parallel Benchmarks (NPBs) with HPF and OpenMP directives, and extended the work with Java and Java-threads. The purpose of this study is to examine the effectiveness of alternative programming paradigms. NPBs consist of five kernels and three simulated applications that mimic the computation and data movement of large scale computational fluid dynamics (CFD) applications. We started with the serial version included in NPB2.3. Optimization of memory and cache usage

  13. GetData Digitizing Program Code: Description, Testing, Training

    International Nuclear Information System (INIS)

    Taova, S.

    2013-01-01

    90 percents of compilation in our center is obtained by data digitizing. So we are rather interested in the development of different techniques of data digitizing. Plots containing a great amount of points and solid lines are most complicated for digitizing. From our point of view including to the Exfor-Digitizer procedures of automatic or semi-automatic digitizing will allow to simplify significantly this process. We managed to test some free available program codes. Program GETDATA Graph Digitizer (www.getdata- graph-digitizer.com) looks more suitable for our purposes. GetData Graph Digitizer is a program for digitizing graphs, plots and maps. Main features of GetData Graph Digitizer are: - supported graphics formats are TIFF, JPEG, BMP and PCX; - two algorithms for automatic digitizing; - convenient manual digitizing; - reorder tool for easy points reordering; - save/open workspace, which allows to save the work and return to it later; - obtained data can be exported to the clipboard; - export to the formats: TXT (text file), XLS (MS Excel), XML, DXF (AutoCAD) and EPS (PostScript). GetData Graph Digitizer includes two algorithms for automatic digitizing. Auto trace lines: This method is designed to digitize solid lines. Choose the starting point, and the program will trace the line, stopping at it's end. To trace the line use Operations =>Auto trace lines menu or context menu ('Auto trace lines' item). To choose starting point click left mouse button, or click right mouse button to additionally choose direction for line tracing. Digitize area: The second way is to set digitizing area. This method works for any type of lines, including dashed lines. Data points are set at the intersection of grid with the line. You can choose the type of grid (X grid or Y grid), and set the distance between grid lines. You can also make the grid be shifted in such a way, that it will pass through a specific X (or Y) value. To digitize area use Operations →Digitize area menu

  14. Tokamak start-up with electron-cyclotron heating

    Energy Technology Data Exchange (ETDEWEB)

    Holly, D J; Prager, S C; Shepard, D A; Sprott, J C [Wisconsin Univ., Madison (USA)

    1981-11-01

    Experiments are described in which the start-up voltage in a tokamak is reduced by about a factor of two by the use of a modest amount of electron cyclotron resonance heating power for pre-ionization. The solution of the zero-dimensional start-up equations indicates that the effect is due to the high initial density which increases the rate at which the conductivity increases in the neutral-dominated initial plasma. The effect extrapolates favourably to larger tokamaks. A 50% reduction in the start-up volt-second requirement and impurity reflux is also observed.

  15. Tokamak start-up with electron-cyclotron heating

    International Nuclear Information System (INIS)

    Holly, D.J.; Prager, S.C.; Shepard, D.A.; Sprott, J.C.

    1981-01-01

    Experiments are described in which the start-up voltage in a tokamak is reduced by about a factor of two by the use of a modest amount of electron cyclotron resonance heating power for pre-ionization. The solution of the zero-dimensional start-up equations indicates that the effect is due to the high initial density which increases the rate at which the conductivity increases in the neutral-dominated initial plasma. The effect extrapolates favourably to larger tokamaks. A 50% reduction in the start-up volt-second requirement and impurity reflux is also observed. (author)

  16. Predicting start-up success with machine learning

    OpenAIRE

    Bento, Francisco Ramadas da Silva Ribeiro

    2018-01-01

    Start-ups are becoming the motor that moves our economy. Google, Apple, or more recently Airbnb and Uber are companies with tremendous impact in worldwide economy, social interactions and government. Over the past decade, both in the US and Europe, there has been an exponential growth in start-up formation. Thus, it seems a relevant challenge understanding what makes this type of high-risk ventures successful and as such, attractive to investors and entrepreneurs. Success for a start-up is de...

  17. Product innovation and commercialization in lean global start-ups

    DEFF Research Database (Denmark)

    Tanev, Stoyan; Rasmussen, Erik Stavnsager; Zijdemans, Erik

    2015-01-01

    The paper examines the distinctive characteristics of product innovation and commercialization in Lean Global Start-up (LGS) – new technology firms which have adopted a lean and global path from or near to their inception. It suggests an uncertainty vs risk framework which allows integrating two...... research streams – Born Global (BG) firms and lean start-ups. In addition to its integrative theoretical value, the paper offers insights for lean start-up managers dealing with the challenges of a global start....

  18. Roads Leading to Self-Employment: Comparing Transgenerational Entrepreneurs and Self-Made Start-Ups

    OpenAIRE

    Blumberg, Boris; Pfann, Gerard Antonie

    2015-01-01

    This paper studies the event history of business foundation and distinguishes between transgenerational entrepreneurship and self-made start-ups. Three theoretical concepts of human, financial and social capital are linked to investigate variations over time in the decision process to become self-employed. Data from a cohort of Dutch inhabitants born in 1939/1940 who have been interviewed three times during their lives in 1952, 1983, and 1993 allows testing theoretical hypotheses that state c...

  19. Improving ADM1 model to simulate anaerobic digestion start-up with inhibition phase based on cattle slurry

    International Nuclear Information System (INIS)

    Normak, A.; Suurpere, J.; Suitso, I.; Jõgi, E.; Kokin, E.; Pitk, P.

    2015-01-01

    The Anaerobic Digestion Model No.1 (ADM1) was improved to simulate an anaerobic digestion start-up phase. To improve the ADM1, a combined hydrolysis equation was used based on the Contois model of bacterial growth and the function of hydrolysis inhibition by VFA. The start-up with fresh cattle slurry was carried out in a pilot-scale reactor to calibrate the chosen parameters of the ADM1. The important aspects of model calibration were hydrolysis rate, the number of anaerobic microbes in cattle slurry, and the growth rate of bacteria. Good simulation results were achieved after calibration for the independent start-up test with pre-conditioned cattle slurry. - Highlights: • Improved ADM1 can be used for simulation of reactor start-up with inhibition phase. • The hydrolysis rate had a decreased value in case of high VFA concentration or low number of hydrolytic bacteria. • Hydrolysis inhibitory threshold value of 9.85 g L −1 was obtained for VFA. • Start-up with pre-conditioned cattle slurry had a relatively short inhibition phase

  20. Allen Newell's Program of Research: The Video-Game Test.

    Science.gov (United States)

    Gobet, Fernand

    2017-04-01

    Newell (1973) argued that progress in psychology was slow because research focused on experiments trying to answer binary questions, such as serial versus parallel processing. In addition, not enough attention was paid to the strategies used by participants, and there was a lack of theories implemented as computer models offering sufficient precision for being tested rigorously. He proposed a three-headed research program: to develop computational models able to carry out the task they aimed to explain; to study one complex task in detail, such as chess; and to build computational models that can account for multiple tasks. This article assesses the extent to which the papers in this issue advance Newell's program. While half of the papers devote much attention to strategies, several papers still average across them, a capital sin according to Newell. The three courses of action he proposed were not popular in these papers: Only two papers used computational models, with no model being both able to carry out the task and to account for human data; there was no systematic analysis of a specific video game; and no paper proposed a computational model accounting for human data in several tasks. It is concluded that, while they use sophisticated methods of analysis and discuss interesting results, overall these papers contribute only little to Newell's program of research. In this respect, they reflect the current state of psychology and cognitive science. This is a shame, as Newell's ideas might help address the current crisis of lack of replication and fraud in psychology. Copyright © 2017 The Author. Topics in Cognitive Science published by Wiley Periodicals, Inc. on behalf of Cognitive Science Society.

  1. Nuclear thermal rocket nozzle testing and evaluation program

    International Nuclear Information System (INIS)

    Davidian, K.O.; Kacynski, K.J.

    1993-01-01

    Performance characteristics of the Nuclear Thermal Rocket can be enhanced through the use of unconventional nozzles as part of the propulsion system. In this report, the Nuclear Thermal Rocket nozzle testing and evaluation program being conducted at the NASA Lewis Research Center is outlined and the advantages of a plug nozzle are described. A facility description, experimental designs and schematics are given. Results of pretest performance analyses show that high nozzle performance can be attained despite substantial nozzle length reduction through the use of plug nozzles as compared to a convergent-divergent nozzle. Pretest measurement uncertainty analyses indicate that specific impulse values are expected to be within plus or minus 1.17%

  2. Power Burst Facility severe-fuel-damage test program

    International Nuclear Information System (INIS)

    McCardell, R.K.; MacDonald, P.E.

    1982-01-01

    As a result of the Three Mile Island Unit 2 (TMI-2) accident, the United States Nuclear Regulatory Commission (USNRC) has initiated a severe fuel damage research program to investigate fuel rod and core response, and fission product and hydrogen release and transport during degraded core cooling accidents. This paper presents a discussion of the expected benefits of the PBF severe fuel damage tests to the nuclear industry, a description of the first five planned experiments, the results of pretest analysis performed to predict the fuel bundle heatup for the first two experiments, and a discussion of Phase II severe fuel damage experiments. Modifications to the fission product detection system envisioned for the later experiments are also described

  3. Large scale intender test program to measure sub gouge displacements

    Energy Technology Data Exchange (ETDEWEB)

    Been, Ken; Lopez, Juan [Golder Associates Inc, Houston, TX (United States); Sancio, Rodolfo [MMI Engineering Inc., Houston, TX (United States)

    2011-07-01

    The production of submarine pipelines in an offshore environment covered with ice is very challenging. Several precautions must be taken such as burying the pipelines to protect them from ice movement caused by gouging. The estimation of the subgouge displacements is a key factor in pipeline design for ice gouged environments. This paper investigated a method to measure subgouge displacements. An experimental program was implemented in an open field to produce large scale idealized gouges on engineered soil beds (sand and clay). The horizontal force required to produce the gouge, the subgouge displacements in the soil and the strain imposed by these displacements were monitored on a buried model pipeline. The results showed that for a given keel, the gouge depth was inversely proportional to undrained shear strength in clay. The subgouge displacements measured did not show a relationship with the gouge depth, width or soil density in sand and clay tests.

  4. DCS-Neural-Network Program for Aircraft Control and Testing

    Science.gov (United States)

    Jorgensen, Charles C.

    2006-01-01

    A computer program implements a dynamic-cell-structure (DCS) artificial neural network that can perform such tasks as learning selected aerodynamic characteristics of an airplane from wind-tunnel test data and computing real-time stability and control derivatives of the airplane for use in feedback linearized control. A DCS neural network is one of several types of neural networks that can incorporate additional nodes in order to rapidly learn increasingly complex relationships between inputs and outputs. In the DCS neural network implemented by the present program, the insertion of nodes is based on accumulated error. A competitive Hebbian learning rule (a supervised-learning rule in which connection weights are adjusted to minimize differences between actual and desired outputs for training examples) is used. A Kohonen-style learning rule (derived from a relatively simple training algorithm, implements a Delaunay triangulation layout of neurons) is used to adjust node positions during training. Neighborhood topology determines which nodes are used to estimate new values. The network learns, starting with two nodes, and adds new nodes sequentially in locations chosen to maximize reductions in global error. At any given time during learning, the error becomes homogeneously distributed over all nodes.

  5. Emergency medical support for a manned stratospheric balloon test program.

    Science.gov (United States)

    Blue, Rebecca S; Norton, Sean C; Law, Jennifer; Pattarini, James M; Antonsen, Erik L; Garbino, Alejandro; Clark, Jonathan B; Turney, Matthew W

    2014-10-01

    Red Bull Stratos was a commercial program that brought a test parachutist, protected by a full-pressure suit, in a stratospheric balloon with pressurized capsule to over 127,582 ft (38,969 m), from which he free fell and subsequently parachuted to the ground. Given that the major risks to the parachutist included ebullism, negative Gz (toe-to-head) acceleration exposure from an uncontrolled flat spin, and trauma, a comprehensive plan was developed to recover the parachutist under nominal conditions and to respond to any medical contingencies that might have arisen. In this report, the project medical team describes the experience of providing emergency medical support and crew recovery for the manned balloon flights of the program. The phases of flight, associated risks, and available resources were systematically evaluated. Six distinct phases of flight from an Emergency Medical Services (EMS) standpoint were identified. A Medical Support Plan was developed to address the risks associated with each phase, encompassing personnel, equipment, procedures, and communications. Despite geographical, communications, and resource limitations, the medical team was able to implement the Medical Support Plan, enabling multiple successful manned balloon flights to 71,615 ft (21,828 m), 97,221 ft (29,610 m), and 127,582 ft (38,969 m). The experience allowed refinement of the EMS and crew recovery procedures for each successive flight and could be applied to other high altitude or commercial space ventures.

  6. Employee assistance programs, drug testing, and workplace injury.

    Science.gov (United States)

    Waehrer, Geetha M; Miller, Ted R; Hendrie, Delia; Galvin, Deborah M

    2016-06-01

    Little is known about the effects of employee assistance programs (EAPs) on occupational injuries. Multivariate regressions probed a unique data set that linked establishment information about workplace anti-drug programs in 1988 with occupational injury rates for 1405 establishments. EAPs were associated with a significant reduction in both no-lost-work and lost-work injuries, especially in the manufacturing and transportation, communication and public utilities industries (TCPU). Lost-work injuries were more responsive to specific EAP characteristics, with lower rates associated with EAPs staffed by company employees (most likely onsite). Telephone hotline services were associated with reduced rates of lost-work injuries in manufacturing and TCPU. Drug testing was associated with reductions in the rate of minor injuries with no lost work, but had no significant relationship with lost-work injuries. This associational study suggests that EAPs, especially ones that are company-staffed and ones that include telephone hotlines, may prevent workplace injuries. Copyright © 2016. Published by Elsevier Ltd.

  7. 77 FR 48527 - National Customs Automation Program (NCAP) Test Concerning Automated Commercial Environment (ACE...

    Science.gov (United States)

    2012-08-14

    ... National Customs Automation Program (NCAP) test concerning the simplified entry functionality in the... DEPARTMENT OF HOMELAND SECURITY U.S. Customs and Border Protection National Customs Automation Program (NCAP) Test Concerning Automated Commercial Environment (ACE) Simplified Entry: Modification of...

  8. Decision Enhancement Services for Small and Medium Enterprise Start-Ups in Uganda

    NARCIS (Netherlands)

    Sol, H G; Basaza, Habinka; Sprague, Ralph H.

    2012-01-01

    While start-up firms create a substantial economic impact on most economies, the failure rate of start-up firms seems to remain high due to inadequate agile decision services. Deciding to start-up mining Small and Medium Enterprises (SME) is a challenging task in Uganda. Research on SME start-up

  9. Řízení rozvoje start-up společnosti

    OpenAIRE

    Paluch, Juraj

    2013-01-01

    Thesis deals with startup companies and their development methodology. The main aim is to present a model of startup company development. Within the theoretical part successful and unsuccessful businesses are analyzed and selected approaches to the development of startup companies are explained. In practical part, based on the findings a model for startup company development is proposed.

  10. General-Purpose Heat Source Development: Safety Test Program. Postimpact evaluation, Design Iteration Test 3

    International Nuclear Information System (INIS)

    Schonfeld, F.W.; George, T.G.

    1984-07-01

    The General-Purpose Heat Source(GPHS) provides power for space missions by transmitting the heat of 238 PuO 2 decay to thermoelectric elements. Because of the inevitable return of certain aborted missions, the heat source must be designed and constructed to survive both re-entry and Earth impact. The Design Iteration Test (DIT) series is part of an ongoing test program. In the third test (DIT-3), a full GPHS module was impacted at 58 m/s and 930 0 C. The module impacted the target at an angle of 30 0 to the pole of the large faces. The four capsules used in DIT-3 survived impact with minimal deformation; no internal cracks other than in the regions indicated by Savannah River Plant (SRP) preimpact nondestructive testing were observed in any of the capsules. The 30 0 impact orientation used in DIT-3 was considerably less severe than the flat-on impact utilized in DIT-1 and DIT-2. The four capsules used in DIT-1 survived, while two of the capsules used in DIT-2 breached; a small quantity (approx. = 50 μg) of 238 PuO 2 was released from the capsules breached in the DIT-2 impact. All of the capsules used in DIT-1 and DIT-2 were severely deformed and contained large internal cracks. Postimpact analyses of the DIT-3 test components are described, with emphasis on weld structure and the behavior of defects identified by SRP nondestructive testing

  11. Transportable Heavy Duty Emissions Testing Laboratory and Research Program

    Energy Technology Data Exchange (ETDEWEB)

    David Lyons

    2008-03-31

    The objective of this program was to quantify the emissions from heavy-duty vehicles operating on alternative fuels or advanced fuel blends, often with novel engine technology or aftertreatment. In the first year of the program West Virginia University (WVU) researchers determined that a transportable chassis dynamometer emissions measurement approach was required so that fleets of trucks and buses did not need to be ferried across the nation to a fixed facility. A Transportable Heavy-Duty Vehicle Emissions Testing Laboratory (Translab) was designed, constructed and verified. This laboratory consisted of a chassis dynamometer semi-trailer and an analytic trailer housing a full scale exhaust dilution tunnel and sampling system which mimicked closely the system described in the Code of Federal Regulations for engine certification. The Translab was first used to quantify emissions from natural gas and methanol fueled transit buses, and a second Translab unit was constructed to satisfy research demand. Subsequent emissions measurement was performed on trucks and buses using ethanol, Fischer-Tropsch fuel, and biodiesel. A medium-duty chassis dynamometer was also designed and constructed to facilitate research on delivery vehicles in the 10,000 to 20,000lb range. The Translab participated in major programs to evaluate low-sulfur diesel in conjunction with passively regenerating exhaust particulate filtration technology, and substantial reductions in particulate matter were recorded. The researchers also participated in programs to evaluate emissions from advanced natural gas engines with closed loop feedback control. These natural gas engines showed substantially reduced levels of oxides of nitrogen. For all of the trucks and buses characterized, the levels of carbon monoxide, oxides of nitrogen, hydrocarbons, carbon dioxide and particulate matter were quantified, and in many cases non-regulated species such as aldehydes were also sampled. Particle size was also

  12. Efficient separations and processing crosscutting program: Develop and test sorbents

    International Nuclear Information System (INIS)

    Bray, L.A.

    1995-09-01

    This report summarizes work performed during FY 1995 under the task open-quotes Develop and Test Sorbents,close quotes the purpose of which is to develop high-capacity, selective solid extractants to recover cesium, strontium, and technetium from nuclear wastes. This work is being done for the Efficient Separations and Processing Crosscutting Program (ESP), operated by the U.S. Department of Energy's Office of Environmental Management's Office of Technology Development. The task is under the direction of staff at Pacific Northwest Laboratory (PNL) with key participation from industrial and university staff at 3M, St. Paul, Minnesota; IBC Advanced Technologies, Inc., American Forks, Utah; AlliedSignal, Inc., Des Plaines, Illinois, and Texas A ampersand M University, College Station, Texas. 3M and IBC are responsible for ligand and membrane technology development; AlliedSignal and Texas A ampersand M are developing sodium titanate powders; and PNL is testing the materials developed by the industry/university team members. Major accomplishments for FY 1995 are summarized in this report

  13. The Livermore Free-Electron Laser Program Magnet Test Laboratory

    International Nuclear Information System (INIS)

    Burns, M.J.; Kulke, B.; Deis, G.A.; Frye, R.W.; Kallman, J.S.; Ollis, C.W.; Tyler, G.C.; Van Maren, R.D.; Weiss, W.C.

    1987-01-01

    The Lawrence Livermore National Laboratory (LLNL) Free-Electron Laser Program Magnet Test Laboratory supports the ongoing development of the Induction Linac Free Electron Laser (IFEL) and uses magnetic field measurement systems that are useful in the testing of long periodic magnetic structures, electron-beam transport magnets, and spectrometer magnets. The major systems described include two computer-controlled, three-axis Hall probe-and-search coil transports with computer-controlled data acquisition; a unique, automated-search coil system used to detect very small inaccuracies in wiggler fields; a nuclear magnetic resonance (NMR)-based Hall probe-calibration facility; and a high-current DC ion source using heavy ions of variable momentum to model the transport of high-energy electrons. Additionally, a high-precision electron-beam-position monitor for use within long wigglers that has a positional resolution of less than 100 μm is under development in the laboratory and will be discussed briefly. Data transfer to LLNL's central computing facility and on-line graphics enable us to analyze large data sets quickly. 3 refs

  14. CERN confident of LHC start-up in 2007

    CERN Document Server

    2007-01-01

    "Delegates attending the 140th meeting of CERN Council heard a confident report from the Laboratory about the scheduled start-up of the world's highest energy particle accelerator, the Large Hadron Collier (LHC), in 2007." (1 page)

  15. Skill Heterogeneity in Startups and its Development over Time

    DEFF Research Database (Denmark)

    Kaiser, Ulrich; Müller, Bettina

    2015-01-01

    We study how startup teams are assembled in terms of team member human capital characteristics. To this end, we derive a statistically motivated benchmark for new venture team heterogeneity in terms of observed team member characteristics to generate stylized facts about team member diversity...... at startup and how it evolves as the new venture matures. We use the population of Danish startups that were established in 1998 and track them until 2001. Main findings are that teams are relatively more homogeneous at startup compared to our benchmark, indicating that difficulties associated with workforce...... heterogeneity (like affective conflict or coordination cost) as well as “homophily” (people’s inclination to bound with others with similar characteristics) may overweigh the benefits of heterogeneity. While workforce heterogeneity does increase over time, the increase is smaller compared to our benchmark...

  16. 1-D hybrid code for FRM start-up

    International Nuclear Information System (INIS)

    Stark, R.A.; Miley, G.H.

    1982-01-01

    A one-D hybrid has been developed to study the start-up of the FRM via neutral-beam injection. The code uses a multi-group numerical model originally developed by J. Willenberg to describe fusion product dynamics in a solenoidal plasma. Earlier we described such a model for use in determining self-consistent ion currents and magnetic fields in FRM start-up. However, consideration of electron dynamics during start-up indicate that the electron current will oppose the injected ion current and may even foil the attempt to achieve reversal. For this reason, we have combined the multi-group ion (model) with a fluid treatment for electron dynamics to form the hybrid code FROST (Field Reversed One-dimensional STart-up). The details of this merger, along with sample results of operation of FROST, are given

  17. Intellectual property and financing strategies for technology startups

    CERN Document Server

    Halt, Jr , Gerald B; Stiles, Amber R; Fesnak, Robert

    2017-01-01

    This book offers a comprehensive, easy to understand guide for startup entities and developing companies, providing insight on the various sources of funding that are available, how these funding sources are useful at each stage of a company’s development, and offers a comprehensive intellectual property strategy that parallels each stage of development. The IP strategies offered in this book take into consideration the goals that most startups and companies have at each stage of development, as well as the limitations that exist at each stage (i.e., limited available resources earmarked for intellectual property asset development), and provides solutions that startups and companies can implement to maximize their return on intellectual property investments. This book also includes a number of descriptive examples, case studies and scenarios to illustrate the topics discussed, and is intended for use by startups and companies across all industries. Readers will garner an appreciation for the value that inte...

  18. Startup, Shutdown, & Malfunction (SSM) Emissions at Industrial Facilities

    Science.gov (United States)

    EPA issued a final action to ensure states have plans in place that are fully consistent with the Clean Air Act and recent court decisions concerning startup, shutdown and malfunction (SSM) operations.

  19. Science Library of Test Items. Volume Thirteen. Mastery Testing Program. [Mastery Tests Series 5.] Tests M51-M65.

    Science.gov (United States)

    New South Wales Dept. of Education, Sydney (Australia).

    As part of a series of tests to measure mastery of specific skills in the natural sciences, copies of tests 51 through 65 include: (51) interpreting atomic and mass numbers; (52) extrapolating from a geological map; (53) matching geological sections and maps; (54) identifying parts of the human eye; (55) identifying the functions of parts of a…

  20. Carboy Security Testing and Training Programs for Industrial Control Systems

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, Daniel [Idaho National Laboratory, Idaho (United States)

    2012-03-15

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These training vary from web-based cyber security training for control systems engineers to more advanced hands-on training that culminates with a Red Team/Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  1. The insulation irradiation test program for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    McManamy, T.J.; Kanemoto, G.; Snook, P.

    1990-01-01

    The electrical insulation for the toroidal field coils of the Compact Ignition Tokamak (CIT) is expected to be exposed to radiation doses on the order of 10 10 rad with ∼90% of the dose from neutrons. The coils are cooled to liquid nitrogen temperature and then heated during the pulse to a peak temperature >300 K. In a program to evaluate the effects of radiation exposure on the insulators, three types of boron-free insulation were irradiated at room temperature in the Advanced Technology Reactor (ATR) and tested at the Idaho National Engineering Laboratory. The materials were Spaulrad-S, Shikishima PG5-1, and Shikishima PG3-1. The first two use a bismaleimide resin and the third an aromatic amine hardened epoxy. Spaulrad-S is a two-dimensional (2-D) weave of S-glass, while the others are 3-D weaves of T-glass. Flexure and shear/compression samples were irradiated to approximately 5 x 10 9 rad and 3 x 10 10 rad with 35 to 40% of the total dose from neutrons. The shear/compression samples were tested in pairs by applying an average compression of 345 MPa and then a shear load. After static tests were completed, fatigue testing was done by cycling the shear load for up to 30,000 cycles with a constant compression. The static shear strength of the samples that did not fail was then determined. Generally, shear strengths on the order of 120 MPa were measured. The behavior of the flexure and shear/compression samples was significantly different; large reductions in the flexure strength were observed, while the shear strength stayed the same or increased slightly. The 3-D weave material demonstrated higher strength and significantly less radiation damage than the 2-D material in flexure but performed nearly identically when tested with combined shear and compression. The epoxy system was much more sensitive to fatigue damage than the bismaleimide materials. 9 refs., 5 figs

  2. 78 FR 27984 - Modification of the National Customs Automation Program Test (NCAP) Regarding Reconciliation for...

    Science.gov (United States)

    2013-05-13

    ... Customs Automation Program Test (NCAP) Regarding Reconciliation for Filing Certain Post-Importation Claims... Automation Program (NCAP) Reconciliation prototype test to include the filing of post-importation [[Page... of the Test Reconciliation, a planned component of the National Customs Automation Program (NCAP), as...

  3. 77 FR 36014 - Initial Test Program of Emergency Core Cooling Systems for Boiling-Water Reactors

    Science.gov (United States)

    2012-06-15

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0134] Initial Test Program of Emergency Core Cooling... for public comment draft regulatory guide (DG), DG-1277, ``Initial Test Program of Emergency Core..., entitled, ``Initial Test Program of Emergency Core Cooling Systems for Boiling-Water Reactors,'' is...

  4. University Start-ups: A Better Business Model

    Science.gov (United States)

    Dehn, J.; Webley, P. W.

    2015-12-01

    Many universities look to start-up companies as a way to attract faculty, supporting research and students as traditional federal sources become harder to come by. University affiliated start-up companies can apply for a broader suite of grants, as well as market their services to a broad customer base. Often university administrators see this as a potential panacea, but national statistics show this is not the case. Rarely do universities profit significantly from their start-ups. With a success rates of around 20%, most start-ups end up costing the university money as well as faculty-time. For the faculty, assuming they want to continue in academia, a start-up is often unattractive because it commonly leads out of academia. Running a successful business as well as maintaining a strong teaching and research load is almost impossible to do at the same time. Most business models and business professionals work outside of academia, and the models taught in business schools do not merge well in a university environment. To mitigate this a new business model is proposed where university start-ups are aligned with the academic and research missions of the university. A university start-up must work within the university, directly support research and students, and the work done maintaining the business be recognized as part of the faculty member's university obligations. This requires a complex conflict of interest management plan and for the companies to be non-profit in order to not jeopardize the university's status. This approach may not work well for all universities, but would be ideal for many to conserve resources and ensure a harmonious relationship with their start-ups and faculty.

  5. Strategic Management: Business Model Canvas for Start-Up Company

    OpenAIRE

    Sonninen, Anna

    2016-01-01

    Thesis is written about development of Kakunpala as a Start-Up Company, because development processes and ideas are the key factors for future success of the company. The aim of this thesis is to understand Strategic Management of the Company and Development processes,by using the SWOT analysis before and after development and by applying Business Model Canvas template to the Start-Up Company, and by describing Customer Journey: what relations Kakunpala has with clients and its processes...

  6. GUERRILLA MARKETING : A creative marketing method for start-ups

    OpenAIRE

    Zujewska, Barbara

    2014-01-01

    The objective of this thesis work was to introduce guerrilla marketing as a valuable marketing method for small and medium size startup companies. The thesis presents the theoretical studies on the subject based on literature and case studies. The practical use of the theory is demonstrated in the marketing plan based on guerrilla marketing approach. The marketing plan was written based on the example of an existing startup company, mCASH. The company is located in Oslo, Norway. The thesis...

  7. Digital Innovations: Startup Marketing Strategy for Global Growth

    OpenAIRE

    Gröhn, Hanna

    2017-01-01

    This thesis discusses the relatively new phenomena of innovative digital products created by startup companies, who often must scale globally fast, before the volatile trends or the fierce competition of the digital marketspace take over. International entry itself is no longer the issue, but rather standing out in the crowd while balancing resources and flexibility. The focus is on how startups can induce global growth and tackle structural obstacles by means of marketing strategy. The t...

  8. Dampak Mentoring Pada Keberhasilan Start-Up Business: Studi Kasus Pada Start-Up Business di Indonesia [Mentoring the Impact of Success of a Start-Up Business: A Case Study of a Start-Up Business in Indonesia

    OpenAIRE

    Christina Yanita Setyawati

    2016-01-01

    Entrepreneurship is a highly developed science today, as well as in the world of education in Indonesia. Teaching entrepreneurship at the university level, especially at some universities in Surabaya, the second largest city in Indonesia, shows the positive impact that there were 74.03% of start-up businesses that survived and thrived in 2014. Based on the previous observation, some business start-ups are accompanied by a mentor. Mentoring is a process of forming and maintaining lasting relat...

  9. Startup and mode competition in a 420 GHz gyrotron

    Science.gov (United States)

    Qixiang Zhao, A.; Sheng Yu, B.; Tianzhong Zhang, C.

    2017-09-01

    In the experiments of a 420 GHz second-harmonic gyrotron, it is found that the electron beam voltage and current ranges for single mode operation of TE17.4 are slightly narrower than those in the simulation. To explain this phenomenon, the startup scenario has been investigated with special emphasis on mode competition. The calculations indicate that the decreases of the operating ranges are caused by the voltage overshoot in the startup scenario.

  10. Waste Isolation Pilot Plant (WIPP) startup plan

    International Nuclear Information System (INIS)

    1988-03-01

    To allow the Waste Isolation Pilot Plant (WIPP) to transition from a Major System Acquisition to an operating demonstration facility, the Acquisition Executive and the Energy System Acquisition Advisory Board (ESAAB) must concur in the facility's readiness to receive waste. This action, designated in DOE Order 4700.1 as Key Decision Four, concludes with the Chairman of the ESAAB issuing a Record of Decision. Since the meeting leading to the Record of Decision is scheduled for August 1988, plans must be made to ensure all activities contributing to that decision are completed in a clear and well-coordinated process. To support that effort, this Start-Up Plan was prepared to identify and track key events necessary to verify WIPP's readiness to receive waste; this provides a management/scheduling/tracking tool for the DOE WIPP Project Office (WPO) and a tracking mechanism for the DOE Albuquerque Operations Office (DOE-AL) and for DOE Headquarters (DOE-HQ); and describe the process to ensure readiness is documented by providing relevant data and reports to the cognizant decision makers. The methods by which these two purposes are achieved are discussed in further detail in the remainder of this plan

  11. Giving start-ups a helping hand

    CERN Multimedia

    2008-01-01

    The French-Swiss foundation for research and technology (FFSRT) joined forces with CERN to organise an information day on setting up new businesses, at the Globe of Science and Innovation. The participants heard talks by entrepreneurs who started out at CERN, sharing their experiences and difficulties.CERN is a hot-bed of high-tech skills and know-how, and the Organization works actively to transfer this expertise to society. Some such innovations can lead to new business start-ups, but it can be extremely difficult to obtain the information and support you need to find your way through the inevitable administrative labyrinth. By opening its doors to the Fondation franco-suisse pour la recherche et la technologie (FFSRT) and hosting this "Entrepreneurial Day" on 7 March, CERN has clearly flagged its desire to assist budding entrepreneurs. The day was jointly kicked off by Olga Hooft, General Manager of the FFSRT, and Maximilian Metzger, CERN’s Se...

  12. Creating a test blueprint for a progress testing program: A paired-comparisons approach.

    Science.gov (United States)

    von Bergmann, HsingChi; Childs, Ruth A

    2018-03-01

    Creating a new testing program requires the development of a test blueprint that will determine how the items on each test form are distributed across possible content areas and practice domains. To achieve validity, categories of a blueprint are typically based on the judgments of content experts. How experts judgments are elicited and combined is important to the quality of resulting test blueprints. Content experts in dentistry participated in a day-long faculty-wide workshop to discuss, refine, and confirm the categories and their relative weights. After reaching agreement on categories and their definitions, experts judged the relative importance between category pairs, registering their judgments anonymously using iClicker, an audience response system. Judgments were combined in two ways: a simple calculation that could be performed during the workshop and a multidimensional scaling of the judgments performed later. Content experts were able to produce a set of relative weights using this approach. The multidimensional scaling yielded a three-dimensional model with the potential to provide deeper insights into the basis of the experts' judgments. The approach developed and demonstrated in this study can be applied across academic disciplines to elicit and combine content experts judgments for the development of test blueprints.

  13. Technological start of T-15 tokamak. The start-up diagnostic complex

    International Nuclear Information System (INIS)

    Notkin, G.E.

    1989-01-01

    The T-15 tokamak with superconducting toroidal winding reached the technological start-up phase. The results of the first operating tests of the main tokamak components are reported. Due to improper function of both the vacuum and the cryogenic system, the nominal parameters of the vacuum and of the toroidal magnetic field have not been achieved. The non-optimum vacuum conditions made the discharge start-up difficult even when a pre-ionizing electron beam and a gyrotron generator were used. The pre-discharge plasma parametes were studied by means of a limited set of plasma diagnostic apparatus. Due to substantially deteriorated vacuum conditions, it was not possible to repeat the only one successful discharge with a current of 100 kA, lasting for 50 ms. (J.U.)

  14. Startup methods for single-mode gyrotron operation

    International Nuclear Information System (INIS)

    Whaley, D.R.; Tran, M.Q.; Alberti, S.; Tran, T.M.; Antonsen, T.M.; Tran, C.

    1995-03-01

    Experimental results of startup studies on a 118 GHz TE 22,6 gyrotron are presented and compared with theory. The theoretical excitation regimes of competing modes are computed in the energy-velocity-pitch-angle plane near the operation point. The startup paths through the plane are determined by the time evolution of the beam parameters during the startup phase. These startup paths are modified by changing the anode and cathode voltage rise from zero to their nominal values and are seen to determine the cavity oscillating mode. Experimental results show specifically that competition between the TE 22,6 and TE -19,7 mode can be completely eliminated by using the proper startup method in a case where a typical triode startup results in oscillation in the competing TE -19,7 mode. These new results are shown to be in excellent agreement with theory whose approach is general and therefore applicable to gyrotrons operating in any arbitrary cavity mode. (author) 5 figs., 1 tab., 13 refs

  15. Manual wheelchair propulsion patterns on natural surfaces during start-up propulsion.

    Science.gov (United States)

    Koontz, Alicia M; Roche, Bailey M; Collinger, Jennifer L; Cooper, Rory A; Boninger, Michael L

    2009-11-01

    To classify propulsion patterns over surfaces encountered in the natural environment during start-up and compare selected biomechanical variables between pattern types. Case series. National Veterans Wheelchair Games, Minneapolis, MN, 2005. Manual wheelchair users (N=29). Subjects pushed their wheelchairs from a resting position over high-pile carpet, over linoleum, and up a ramp with a 5 degrees incline while propulsion kinematics and kinetics were recorded with a motion capture system and an instrumented wheel. Three raters classified the first 3 strokes as 1 of 4 types on each surface: arc, semicircular (SC), single looping over propulsion (SL), and double looping over propulsion (DL). The Fisher exact test was used to assess pattern changes between strokes and surface type. A multiple analysis of variance test was used to compare peak and average resultant force and moment about the hub, average wheel velocity, stroke frequency, contact angle, and distance traveled between stroke patterns. SL was the most common pattern used during start-up propulsion (44.9%), followed by arc (35.9%), DL (14.1%), and SC (5.1%). Subjects who dropped their hands below the rim during recovery achieved faster velocities and covered greater distances (.016propulsion patterns is a difficult task that should use multiple raters. In addition, propulsion patterns change during start-up, with an arc pattern most prevalent initially. The biomechanical findings in this study agree with current clinical guidelines that recommend training users to drop the hand below the pushrim during recovery.

  16. DATASPACE - A PROGRAM FOR THE LOGARITHMIC INTERPOLATION OF TEST DATA

    Science.gov (United States)

    Ledbetter, F. E.

    1994-01-01

    Scientists and engineers work with the reduction, analysis, and manipulation of data. In many instances, the recorded data must meet certain requirements before standard numerical techniques may be used to interpret it. For example, the analysis of a linear visoelastic material requires knowledge of one of two time-dependent properties, the stress relaxation modulus E(t) or the creep compliance D(t), one of which may be derived from the other by a numerical method if the recorded data points are evenly spaced or increasingly spaced with respect to the time coordinate. The problem is that most laboratory data are variably spaced, making the use of numerical techniques difficult. To ease this difficulty in the case of stress relaxation data analysis, NASA scientists developed DATASPACE (A Program for the Logarithmic Interpolation of Test Data), to establish a logarithmically increasing time interval in the relaxation data. The program is generally applicable to any situation in which a data set needs increasingly spaced abscissa values. DATASPACE first takes the logarithm of the abscissa values, then uses a cubic spline interpolation routine (which minimizes interpolation error) to create an evenly spaced array from the log values. This array is returned from the log abscissa domain to the abscissa domain and written to an output file for further manipulation. As a result of the interpolation in the log abscissa domain, the data is increasingly spaced. In the case of stress relaxation data, the array is closely spaced at short times and widely spaced at long times, thus avoiding the distortion inherent in evenly spaced time coordinates. The interpolation routine gives results which compare favorably with the recorded data. The experimental data curve is retained and the interpolated points reflect the desired spacing. DATASPACE is written in FORTRAN 77 for IBM PC compatibles with a math co-processor running MS-DOS and Apple Macintosh computers running MacOS. With

  17. Financial planning and control in very small start-up companies: antecedents and effects on company performance

    NARCIS (Netherlands)

    Mengel, S.; Wouters, M.

    2015-01-01

    This study motivates and tests hypotheses about the antecedents of the use of financial planning and control systems in very small and young start-up firms, and, in turn, the effect of this on firm performance. This setting is of particular interest since theory on financial planning and control in

  18. Study of the Department of Defense Student Testing Program

    National Research Council Canada - National Science Library

    Davidson, Lance G

    2005-01-01

    ...) Career Exploration Program (CEP) and its contributions to Navy recruiting. The ASVAB-CEP is a Department of Defense program created in 1968, operating in 12,598 high schools throughout the nation as of 2004...

  19. 77 FR 39194 - Combined Drug and Alcohol Testing Programs

    Science.gov (United States)

    2012-07-02

    .... Revise paragraph (c)(5) and redesignate it as (c)(6); Sec. 120.115 Employee Assistance Program (EAP... assistance program (EAP). Finally, this rulemaking would make it clear that the agency's practice of... of the training given to both supervisors and employees in their employee assistance programs...

  20. 78 FR 41999 - Combined Drug and Alcohol Testing Programs

    Science.gov (United States)

    2013-07-15

    ...)(5) and (c)(6). The revisions read as follows: Sec. 120.115 Employee Assistance Program (EAP... of employees, must be documented as part of each employer's employee assistance program. 4. It makes... documentation of the training given to both supervisors and employees in their employee assistance programs...

  1. Automated Critical Peak Pricing Field Tests: Program Descriptionand Results

    Energy Technology Data Exchange (ETDEWEB)

    Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Xu, Peng

    2006-04-06

    California utilities have been exploring the use of critical peak prices (CPP) to help reduce needle peaks in customer end-use loads. CPP is a form of price-responsive demand response (DR). Recent experience has shown that customers have limited knowledge of how to operate their facilities in order to reduce their electricity costs under CPP (Quantum 2004). While the lack of knowledge about how to develop and implement DR control strategies is a barrier to participation in DR programs like CPP, another barrier is the lack of automation of DR systems. During 2003 and 2004, the PIER Demand Response Research Center (DRRC) conducted a series of tests of fully automated electric demand response (Auto-DR) at 18 facilities. Overall, the average of the site-specific average coincident demand reductions was 8% from a variety of building types and facilities. Many electricity customers have suggested that automation will help them institutionalize their electric demand savings and improve their overall response and DR repeatability. This report focuses on and discusses the specific results of the Automated Critical Peak Pricing (Auto-CPP, a specific type of Auto-DR) tests that took place during 2005, which build on the automated demand response (Auto-DR) research conducted through PIER and the DRRC in 2003 and 2004. The long-term goal of this project is to understand the technical opportunities of automating demand response and to remove technical and market impediments to large-scale implementation of automated demand response (Auto-DR) in buildings and industry. A second goal of this research is to understand and identify best practices for DR strategies and opportunities. The specific objectives of the Automated Critical Peak Pricing test were as follows: (1) Demonstrate how an automated notification system for critical peak pricing can be used in large commercial facilities for demand response (DR). (2) Evaluate effectiveness of such a system. (3) Determine how customers

  2. Optimization of operation conditions for the startup of aerobic granular sludge reactors biologically removing carbon, nitrogen, and phosphorous.

    Science.gov (United States)

    Lochmatter, Samuel; Holliger, Christof

    2014-08-01

    The transformation of conventional flocculent sludge to aerobic granular sludge (AGS) biologically removing carbon, nitrogen and phosphorus (COD, N, P) is still a main challenge in startup of AGS sequencing batch reactors (AGS-SBRs). On the one hand a rapid granulation is desired, on the other hand good biological nutrient removal capacities have to be maintained. So far, several operation parameters have been studied separately, which makes it difficult to compare their impacts. We investigated seven operation parameters in parallel by applying a Plackett-Burman experimental design approach with the aim to propose an optimized startup strategy. Five out of the seven tested parameters had a significant impact on the startup duration. The conditions identified to allow a rapid startup of AGS-SBRs with good nutrient removal performances were (i) alternation of high and low dissolved oxygen phases during aeration, (ii) a settling strategy avoiding too high biomass washout during the first weeks of reactor operation, (iii) adaptation of the contaminant load in the early stage of the startup in order to ensure that all soluble COD was consumed before the beginning of the aeration phase, (iv) a temperature of 20 °C, and (v) a neutral pH. Under such conditions, it took less than 30 days to produce granular sludge with high removal performances for COD, N, and P. A control run using this optimized startup strategy produced again AGS with good nutrient removal performances within four weeks and the system was stable during the additional operation period of more than 50 days. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. Hydrogen energy network start-up scenario

    International Nuclear Information System (INIS)

    Weingartner, S.; Ellerbrock, H.

    1994-01-01

    Hydrogen is widely discussed as future fuel and energy storage medium either to replace conventional fuels for automobiles, aircrafts and ships or to avoid the necessity of bulky battery systems for electricity storage, especially in connection with solar power systems. These discussions however started more than 25 years ago and up to now hydrogen has failed to achieve a major break-through towards wider application as energy storage medium in civil markets. The main reason is that other fuels are cheaper and very well implemented in our daily life. A study has been performed at Deutsche Aerospace in order to evaluate the boundary conditions, either political or economical, which would give hydrogen the necessary push, i.e. advantage over conventional fuels. The main goal of this study was to identify critical influence factors and specific start-up scenarios which would allow an economical and practically realistic use of hydrogen as fuel and energy medium in certain niche markets outside the space industry. Method and major results of this study are presented in detail in the paper. Certain niche markets could be identified, where with little initial governmental support, either by funding, tax laws or legislation, hydrogen can compete with conventional fuels. This however requires a scenario where a lot of small actions have to be taken by a high variety of institutions and industries which today are not interconnected with each other, i.e. it requires a new cooperative and proactive network between e.g. energy utilities, car industries, those who have a sound experience with hydrogen (space industry, chemical industry) and last, but certainly not the least, the government. Based on the developed scenario precise recommendations are drawn as conclusions

  4. Action plan for the task: Physical measurements at the RA reactor related to VISA-2 project, '0' program, Reactor start-up and measurement of basic parameters of the new core; Plan rada po zadatku: Fizicka merenja na reaktoru RA u vezi projekta VISA-2, '0' program, Pustanje u rad reaktora RA i merenje osnovnih parametara novog jezgra

    Energy Technology Data Exchange (ETDEWEB)

    Markovic, H; Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1962-07-01

    This report consists of two parts. Part one describes the RA reactor start-up, measurements of thermal neutron flux distribution, measurements of epithermal flux, fast neutron flux distribution, absolute values of both thermal and fast neutron fluxes, calibration of regulating rods, and measurements of neutron flux inside the fuel elements. All the mentioned measurements were done at low power level. Part two includes description of the reactor power increase up to nominal value of 6.5 MW, and measurements of thermal neutron flux distribution under xenon poisoning conditions, measurements of epithermal neutrons, absolute values of both thermal and fast neutron fluxes, and measurements of thermal and epithermal neutron fluxes at the exit of the horizontal experimental channel HK-d.

  5. Resonance investigation of pump-turbine during startup process

    International Nuclear Information System (INIS)

    He, L Y; Wang, Z W; Kurosawa, S; Nakahara, Y

    2014-01-01

    The causes of resonance of a certain model pump-turbine unit during startup process were investigated in this article. A three-dimensional full flow path analysis model which contains spiral case, stay vanes, guide vanes, runner, gaps outside the runner crown and band, and draft tube was constructed. The transient hydraulic excitation force of full flow path was analyzed under five conditions near the resonance region. Based on one-way fluid- structure interaction (FSI) analysis model, the dynamic stress characteristics of the pump-turbine runner was investigated. The results of pressure pulsation, vibration mode and dynamic stress obtained from simulation were consistent with the test results. The study indicated that the hydraulic excitation frequency (Z g *f n ) Hz due to rotor-stator interference corresponding to the natural frequency of 2ND+4ND runner mode is the main cause of resonance. The relationship among pressure pulsation, vibration mode and dynamic stress was discussed in this paper. The results revealed the underlying causes of the resonance phenomenon

  6. Start-up strategies for thermophilic anaerobic digestion of pig manure

    International Nuclear Information System (INIS)

    Moset, V.; Bertolini, E.; Cerisuelo, A.; Cambra, M.; Olmos, A.; Cambra-López, M.

    2014-01-01

    Sludge physicochemical composition, methane (CH 4 ) yield, and methanogenic community structure and dynamics using quantitative real-time polymerase chain reaction were determined after start-up of anaerobic digestion of pig manure. Eight thermophilic continuous stirred anaerobic digesters were used during 126 days. Four management strategies were investigated: a feedless and a non-feedless period followed by a gradual or an abrupt addition of pig manure (two digesters per strategy). During the first 43 days, VFA (volatile fatty acids) accumulations and low CH 4 yield were observed in all digesters. After this period, digesters recovered their initial status being propionic acid the last parameter to be re-established. Non-feedless digesters with an abrupt addition of pig manure showed the best performances (lower VFA accumulation and higher CH 4 yield). Differences in microbial orders and dynamics, however, were less evident among treatments. Hydrogenotrophic methanogenesis, Methanomicrobiales first and Methanobacteriales second, was the dominant metabolic pathway in all digesters. Further research is needed to clarify the role and activity of hydrogenotrophic methanogens during the recovery start-up period and to identify the best molecular tools and methodologies to monitor microbial populations and dynamics reliably and accurately in anaerobic digesters. - Highlights: • Four start-up strategies for thermophilic anaerobic digestion of pig manure were tested. • Physicochemical composition, methane yield and methanogenic community were determined. • During the first 43 days, a decline in reactor's performance occurred. • The best start-up strategy was non-feedless with an abrupt addition of pig slurry. • Hydrogenotrophic methanogenesis was the dominant metabolic pathway

  7. Fast reactor test facilities in the US safety program

    International Nuclear Information System (INIS)

    Avery, R.; Dickerman, C.E.; Lennox, D.H.; Rose, D.

    1979-01-01

    The needs for safety information derivable from in-pile programs are reviewed, and the correlation made with existing and planned capability. In view of the current status of the U.S. breeder program, emphasis is given in the review to the impact of different fast breeder options on the required program and facilities. It is concluded that facility needs are somewhat independent of specific fast breeder concept, even though the relative emphasis on the various safety issues will differ. 8 refs

  8. Federal Spending for Means Tested Programs, 2007 to 2027

    Science.gov (United States)

    2017-02-01

    child tax credits (which are refundable), the Supplemental Nutrition Assistance Program (SNAP), and Supplemental Security Income. The largest non...child tax credits, and SNAP—have been or will be significantly affected by program changes that unfold over time: B Medicaid spending rose by 35...total outlays in the Part D program). Increases in the number of beneficiaries account for about one- third of that growth; the introduction of new

  9. JTst - An Automated Unit Testing Tool for Java Program

    OpenAIRE

    Kamal Z.  Zamli; Nor A. M.  Isa

    2008-01-01

    Software testing is an integral part of software development lifecycle. Lack of testing can often lead to disastrous consequences including lost of data, fortunes, and even lives. Despite its importance, current software testing practice lacks automation, and is still primarily based on highly manual processes from the generation of test cases up to the actual execution of the test. Although the emergence of helpful automated testing tools in the market is blooming, their adoptions are lackin...

  10. Program Correctness, Verification and Testing for Exascale (Corvette)

    Energy Technology Data Exchange (ETDEWEB)

    Sen, Koushik [Univ. of California, Berkeley, CA (United States); Iancu, Costin [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Demmel, James W [UC Berkeley

    2018-01-26

    The goal of this project is to provide tools to assess the correctness of parallel programs written using hybrid parallelism. There is a dire lack of both theoretical and engineering know-how in the area of finding bugs in hybrid or large scale parallel programs, which our research aims to change. In the project we have demonstrated novel approaches in several areas: 1. Low overhead automated and precise detection of concurrency bugs at scale. 2. Using low overhead bug detection tools to guide speculative program transformations for performance. 3. Techniques to reduce the concurrency required to reproduce a bug using partial program restart/replay. 4. Techniques to provide reproducible execution of floating point programs. 5. Techniques for tuning the floating point precision used in codes.

  11. Start-up Funding via Equity Crowdfunding in Germany

    DEFF Research Database (Denmark)

    Angerer, Martin; Brem, Alexander; Kraus, Sascha

    2017-01-01

    Entrepreneurs often struggle to find sufficient funding for their start-ups. A relatively new way for companies to attract capital is via an internet platform, locating investors who in return receive something in return for their ventures. Equity crowdfunding is one of several types of crowdfund......Entrepreneurs often struggle to find sufficient funding for their start-ups. A relatively new way for companies to attract capital is via an internet platform, locating investors who in return receive something in return for their ventures. Equity crowdfunding is one of several types...... of crowdfunding, and is also known as crowdinvesting in the German-speaking realm. This article predominantly advances the scientific knowledge regarding the success factors of equity crowdfunding for German start-ups. The study conducted nine qualitative interviews with start-ups and crowdinvesting platforms....... Its first result is that German start-ups select crowdinvesting because (1) it is a funding opportunity and (2) it has an expected marketing effect. To organize the results of relevant success factors, the Crowdinvesting Success Model was designed by the researchers. This supports German entrepreneurs...

  12. Statement on the first research on digital startups in Poland

    Directory of Open Access Journals (Sweden)

    Agnieszka Skala

    2016-10-01

    Full Text Available The objective of the paper is to present the results of the first study of Polish startups’ ecosystem as the first stage of a larger study of digital economy landscape in Poland. The first estimate of the number of Polish startups amounts to 2400 entities. The publication presents the first survey Polish startups that marks the beginning of cyclical studies on enterprises belonging to the digital economy in Poland. The study was conducted among 423 entities using an in-house questionnaire prepared based on the author’s own knowledge. Results are discussed. Startups most often consider themselves software producers who follow the SaaS model and operate in the following industries: mobile apps, e-commerce and Internet services. Nearly one in three startups achieve 50% annual revenue growth, while in one-fifth such growth exceeds 100%. Almost two thirds of Polish startups are financed exclusively from own funds. It is necessary to repeat and deepen the study in order to determining the significance of the digital industry in the economy of Poland and the CEE region. The originality of this work lies in taking this subject for the first time in Polish literature and in elaborating the proposition of a “startup” term’s definition.

  13. The Rationality and Irrationality of Financing Green Start-Ups

    Directory of Open Access Journals (Sweden)

    Linda Bergset

    2015-11-01

    Full Text Available Green start-ups contribute towards a transition to a more sustainable economy by developing sustainable and environmentally friendly innovation and bringing it to the market. Due to specific product/service characteristics, entrepreneurial motivation and company strategies that might differ from that of other start-ups, these companies might struggle even more than usual with access to finance in the early stages. This conceptual paper seeks to explain these challenges through the theoretical lenses of entrepreneurial finance and behavioural finance. While entrepreneurial finance theory contributes to a partial understanding of green start-up finance, behavioural finance is able to solve a remaining explanatory deficit produced by entrepreneurial finance theory. Although some behavioural finance theorists are suggesting that the current understanding of economic rationality underlying behavioural finance research is inadequate, most scholars have not yet challenged these assumptions, which constrict a comprehensive and realistic description of the reality of entrepreneurial finance in green start-ups. The aim of the paper is thus, first, to explore the specifics of entrepreneurial finance in green start-ups and, second, to demonstrate the need for a more up-to-date conception of rationality in behavioural finance theory in order to enable realistic empirical research in this field.

  14. Experimental Investigation of Heat Pipe Startup Under Reflux Mode

    Science.gov (United States)

    Ku, Jentung

    2018-01-01

    In the absence of body forces such as gravity, a heat pipe will start as soon as its evaporator temperature reaches the saturation temperature. If the heat pipe operates under a reflux mode in ground testing, the liquid puddle will fill the entire cross sectional area of the evaporator. Under this condition, the heat pipe may not start when the evaporator temperature reaches the saturation temperature. Instead, a superheat is required in order for the liquid to vaporize through nucleate boiling. The amount of superheat depends on several factors such as the roughness of the heat pipe internal surface and the gravity head. This paper describes an experimental investigation of the effect of gravity pressure head on the startup of a heat pipe under reflux mode. In this study, a heat pipe with internal axial grooves was placed in a vertical position with different tilt angles relative to the horizontal plane. Heat was applied to the evaporator at the bottom and cooling was provided to the condenser at the top. The liquid-flooded evaporator was divided into seven segments along the axial direction, and an electrical heater was attached to each evaporator segment. Heat was applied to individual heaters in various combinations and sequences. Other test variables included the condenser sink temperature and tilt angle. Test results show that as long as an individual evaporator segment was flooded with liquid initially, a superheat was required to vaporize the liquid in that segment. The amount of superheat required for liquid vaporization was a function of gravity pressure head imposed on that evaporator segment and the initial temperature of the heat pipe. The most efficient and effective way to start the heat pipe was to apply a heat load with a high heat flux to the lowest segment of the evaporator.

  15. SP-100 reactor disassembly remote handling test program

    International Nuclear Information System (INIS)

    Wilson, C.E.; Potter, J.D.; Maiden, G.E.; Vader, D.P.

    1991-01-01

    This paper is presented as an overview of the remote handling equipment validation testing, which will be conducted before installation and use in the ground engineering test facility. This equipment will be used to defuel the SP-100 reactor core after removing it from the Test Assembly following nuclear testing. A series of full scale mock-up operational tests will be conducted at a Hanford Site facility to verify equipment design, operation, and capabilities

  16. 77 FR 11367 - Defense Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation...

    Science.gov (United States)

    2012-02-24

    ...DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement to extend the program period for the DoD Test Program for Negotiation of Comprehensive Small Business Subcontracting Plans.

  17. 75 FR 26183 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-05-11

    ... 2105-AE01 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of...: For program issues, Bohdan Baczara, Office of Drug and Alcohol Policy and Compliance, 1200 New Jersey... of Federal Regulations, as follows: [[Page 26184

  18. Modeling of two-phase flow instabilities during startup transients utilizing RAMONA-4B methodology

    International Nuclear Information System (INIS)

    Paniagua, J.; Rohatgi, U.S.; Prasad, V.

    1996-01-01

    RAMONA-4B code is currently under development for simulating thermal hydraulic instabilities that can occur in Boiling Water Reactors (BWRs) and the Simplified Boiling Water Reactor (SBWR). As one of the missions of RAMONA-4B is to simulate SBWR startup transients, where geysering or condensation-induced instability may be encountered, the code needs to be assessed for this application. This paper outlines the results of the assessments of the current version of RAMONA-4B and the modifications necessary for simulating the geysering or condensation-induced instability. The test selected for assessment are the geysering tests performed by Prof Aritomi (1993)

  19. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Science.gov (United States)

    2010-04-01

    ... basis for selecting participants. (b) NCAP testing. For purposes of conducting an approved test program or procedure designed to evaluate planned components of the National Customs Automation Program (NCAP... publication requirement. For tests affecting the NCAP, notice shall be published in the Federal Register not...

  20. 78 FR 66039 - Modification of National Customs Automation Program Test Concerning Automated Commercial...

    Science.gov (United States)

    2013-11-04

    ... Customs Automation Program Test Concerning Automated Commercial Environment (ACE) Cargo Release (Formerly...) plan to both rename and modify the National Customs Automation Program (NCAP) test concerning the... data elements required to obtain release for cargo transported by air. The test will now be known as...