  1. Integrated scheduling and resource management. [for Space Station Information System

    Science.gov (United States)

    Ward, M. T.

    1987-01-01

    This paper examines the problem of integrated scheduling during the Space Station era. Scheduling for Space Station entails coordinating the support of many distributed users who are sharing common resources and pursuing individual and sometimes conflicting objectives. This paper compares the scheduling integration problems of current missions with those anticipated for the Space Station era. It examines the facilities and the proposed operations environment for Space Station. It concludes that the pattern of interdependecies among the users and facilities, which are the source of the integration problem is well structured, allowing a dividing of the larger problem into smaller problems. It proposes an architecture to support integrated scheduling by scheduling efficiently at local facilities as a function of dependencies with other facilities of the program. A prototype is described that is being developed to demonstrate this integration concept.

  2. Space station program phase B definition: Nuclear reactor-powered space station cost and schedules

    Science.gov (United States)

    1971-01-01

    Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.

  3. Advertisement scheduling on commercial radio station using genetics algorithm

    Science.gov (United States)

    Purnamawati, S.; Nababan, E. B.; Tsani, B.; Taqyuddin, R.; Rahmat, R. F.

    2018-03-01

    On the commercial radio station, the advertising schedule is done manually, which resulted in ineffectiveness of ads schedule. Playback time consists of two types such as prime time and regular time. Radio Ads scheduling will be discussed in this research is based on ad playback schedule between 5am until 12am which rules every 15 minutes. It provides 3 slots ads with playback duration per ads maximum is 1 minute. If the radio broadcast time per day is 12 hours, then the maximum number of ads per day which can be aired is 76 ads. The other is the enactment of rules of prime time, namely the hours where the common people (listeners) have the greatest opportunity to listen to the radio, namely between the hours and hours of 4 am - 8 am, 6 pm - 10 pm. The number of screenings of the same ads on one day are limited to prime time ie 5 times, while for regular time is 8 times. Radio scheduling process is done using genetic algorithms which are composed of processes initialization chromosomes, selection, crossover and mutation. Study on chromosome 3 genes, each chromosome will be evaluated based on the value of fitness calculated based on the number of infractions that occurred on each individual chromosome. Where rule 1 is the number of screenings per ads must not be more than 5 times per day and rule 2 is there should never be two or more scheduling ads delivered on the same day and time. After fitness value of each chromosome is acquired, then the do the selection, crossover and mutation. From this research result, the optimal advertising schedule with schedule a whole day and ads data playback time ads with this level of accuracy: the average percentage was 83.79%.

  4. Two-Stage Multi-Objective Collaborative Scheduling for Wind Farm and Battery Switch Station

    OpenAIRE

    Zhe Jiang; Xueshan Han; Zhimin Li; Wenbo Li; Mengxia Wang; Mingqiang Wang

    2016-01-01

    In order to deal with the uncertainties of wind power, wind farm and electric vehicle (EV) battery switch station (BSS) were proposed to work together as an integrated system. In this paper, the collaborative scheduling problems of such a system were studied. Considering the features of the integrated system, three indices, which include battery swapping demand curtailment of BSS, wind curtailment of wind farm, and generation schedule tracking of the integrated system are proposed. In additio...

  5. Real-Time Forecasting of EV Charging Station Scheduling for Smart Energy Systems

    Directory of Open Access Journals (Sweden)

    Bharatiraja Chokkalingam

    2017-03-01

    Full Text Available The enormous growth in the penetration of electric vehicles (EVs, has laid the path to advancements in the charging infrastructure. Connectivity between charging stations is an essential prerequisite for future EV adoption to alleviate user’s “range anxiety”. The existing charging stations fail to adopt power provision, allocation and scheduling management. To improve the existing charging infrastructure, data based on real-time information and availability of reserves at charging stations could be uploaded to the users to help them locate the nearest charging station for an EV. This research article focuses on an a interactive user application developed through SQL and PHP platform to allocate the charging slots based on estimated battery parameters, which uses data communication with charging stations to receive the slot availability information. The proposed server-based real-time forecast charging infrastructure avoids waiting times and its scheduling management efficiently prevents the EV from halting on the road due to battery drain out. The proposed model is implemented using a low-cost microcontroller and the system etiquette tested.

  6. Optimal Charging Schedule Planning and Economic Analysis for Electric Bus Charging Stations

    Directory of Open Access Journals (Sweden)

    Rong-Ceng Leou

    2017-04-01

    Full Text Available The battery capacity of electric buses (EB used for public transportation is greater than that of electric cars, and the charging power is also several times greater than that used in electric cars; this can result in high energy consumption and negatively impact power distribution networks. This paper proposes a framework to determine the optimal contracted power capacity and charging schedule of an EB charging station in such a way that energy costs can be reduced. A mathematical model of controlled charging, which includes the capacity and energy charges of the station, was developed to minimize costs. The constraints of the model include the charging characteristics of an EB and the operational guidelines of the bus company. A practical EB charging station was used to verify the proposed model. The financial viability of this EB charging station is also studied in this paper. The economic analysis model for this charging station considers investment and operational costs, and the operational revenue. Sensitivity analyses with respect to some key parameters are also performed in this paper. Based on actual operational routes and EB charging schemes, test results indicate that the EB charging station investment is feasible, and the planning model proposed can be used to determine optimal station power capacity and minimize energy costs.

  7. Long-term scheduling of large cascade hydropower stations in Jinsha River, China

    International Nuclear Information System (INIS)

    Wang, Chao; Zhou, Jianzhong; Lu, Peng; Yuan, Liu

    2015-01-01

    Highlights: • Proposing a Gaussian group selection strategy to overcome premature convergence. • Multi-population ant are developed to enhance the search ability. • Proposing a circulatory solution correction to handle constraints. • Numerical and real hydropower system simulation are used to verify its performance. • Compensation analysis has been done to large hydropower stations in Jinsha River. - Abstract: The Jinsha River is the third longest river in the world. It consists of four large hydropower stations with total installed capacity 42,960 MW lying on the upper stretches of the Yangtze River, which is the longest river in the word. Due to the great potential of large cascade hydropower stations on power generation, long-term scheduling of large cascade hydropower stations (LSLCHS) plays an important role in electrical power system. As more and more concentrations focused on the optimal operation of large cascade hydropower stations, the LSLCHS has been taken into a multi-dimensional, non-convex and non-linear optimization problem due to its complicated hydraulic connection relationships and varieties of complex constraints with considering its power generation, shipping and ecological characteristics. In order to solve this problem, a multi-population ant colony optimization for continuous domain (MACO R ) is proposed in this paper. A Gaussian group selection strategy is applied to overcome premature convergence and ants with different characteristics are employed to enhance search ability, and circulatory solution correction strategy is presented to handle outflow, water level and output constraints. Furthermore, the efficiency and stability of MACO R are verified by its more desirable results in comparison to other latest works in numerical simulation, and it can be a viable alternative for solving those complicated optimal problems. With the applications in hydropower operation, LSLCHS can obtain more power generation benefit than other

  8. Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

    Science.gov (United States)

    Jaap, John; Muery, Kim

    2000-01-01

    Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

  9. Two-Stage Multi-Objective Collaborative Scheduling for Wind Farm and Battery Switch Station

    Directory of Open Access Journals (Sweden)

    Zhe Jiang

    2016-10-01

    Full Text Available In order to deal with the uncertainties of wind power, wind farm and electric vehicle (EV battery switch station (BSS were proposed to work together as an integrated system. In this paper, the collaborative scheduling problems of such a system were studied. Considering the features of the integrated system, three indices, which include battery swapping demand curtailment of BSS, wind curtailment of wind farm, and generation schedule tracking of the integrated system are proposed. In addition, a two-stage multi-objective collaborative scheduling model was designed. In the first stage, a day-ahead model was built based on the theory of dependent chance programming. With the aim of maximizing the realization probabilities of these three operating indices, random fluctuations of wind power and battery switch demand were taken into account simultaneously. In order to explore the capability of BSS as reserve, the readjustment process of the BSS within each hour was considered in this stage. In addition, the stored energy rather than the charging/discharging power of BSS during each period was optimized, which will provide basis for hour-ahead further correction of BSS. In the second stage, an hour-ahead model was established. In order to cope with the randomness of wind power and battery swapping demand, the proposed hour-ahead model utilized ultra-short term prediction of the wind power and the battery switch demand to schedule the charging/discharging power of BSS in a rolling manner. Finally, the effectiveness of the proposed models was validated by case studies. The simulation results indicated that the proposed model could realize complement between wind farm and BSS, reduce the dependence on power grid, and facilitate the accommodation of wind power.

  10. Long-Term Scheduling of Large-Scale Cascade Hydropower Stations Using Improved Differential Evolution Algorithm

    Directory of Open Access Journals (Sweden)

    Xiaohao Wen

    2018-03-01

    Full Text Available Long-term scheduling of large cascade hydropower stations (LSLCHS is a complex problem of high dimension, nonlinearity, coupling and complex constraint. In view of the above problem, we present an improved differential evolution (iLSHADE algorithm based on LSHADE, a state-of-the-art evolutionary algorithm. iLSHADE uses new mutation strategies “current to pbest/2-rand” to obtain wider search range and accelerate convergence with the preventing individual repeated failure evolution (PIRFE strategy. The handling of complicated constraints strategy of ε-constrained method is presented to handle outflow, water level and output constraints in the cascade reservoir operation. Numerical experiments of 10 benchmark functions have been done, showing that iLSHADE has stable convergence and high efficiency. Furthermore, we demonstrate the performance of the iLSHADE algorithm by comparing it with other improved differential evolution algorithms for LSLCHS in four large hydropower stations of the Jinsha River. With the applications of iLSHADE in reservoir operation, LSLCHS can obtain more power generation benefit than other alternatives in dry, normal, and wet years. The results of numerical experiments and case studies show that the iLSHADE has a distinct optimization effect and good stability, and it is a valid and reliable tool to solve LSLCHS problem.

  11. Impact of Train Schedule on Pedestrian Movement on Stairway at Suburban Rail Transit Station in Mumbai, India

    Directory of Open Access Journals (Sweden)

    Shah Jiten

    2015-01-01

    Full Text Available Pedestrian flow takes place in confined environment on stairways under the influence of composition, direction of movement, and schedule of trains. During peak-period, alighting and boarding rate is quite high resulting in very high pedestrian movement from one platform to the other to catch the next train at interchange stations. The transfer of passengers from railway platforms through common undivided stairways becomes difficult, uncomfortable, and unsafe at times when pedestrian flow reaches the capacity level. Understanding of criteria defining quality of flow that affect the effectiveness of facilities like stairways in handling the pedestrian traffic is vital for planning and designing of such facilities to ensure the desired level of service as well as safety in case of emergency. The present paper is based on the study of pedestrian movement on stairways at busy suburban rail transit interchange station at Dadar in Mumbai, India. Pedestrian movements are captured through videography at two stairways and the effect of bidirectional movement on average walking speed is analyzed. The ascending flow in small proportion is found to be more influential in causing speed reduction on undivided stairways. The outcome of the study is useful for capacity and level of service analysis while planning and designing the transit station stairways.

  12. Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

    Science.gov (United States)

    Bonine, Lauren

    2015-01-01

    The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

  13. Optimal Scheduling of Energy Storage System for Self-Sustainable Base Station Operation Considering Battery Wear-Out Cost

    Directory of Open Access Journals (Sweden)

    Yohwan Choi

    2016-06-01

    Full Text Available A self-sustainable base station (BS where renewable resources and energy storage system (ESS are interoperably utilized as power sources is a promising approach to save energy and operational cost in communication networks. However, high battery price and low utilization of ESS intended for uninterruptible power supply (UPS necessitates active utilization of ESS. This paper proposes a multi-functional framework of ESS using dynamic programming (DP for realizing a sustainable BS. We develop an optimal charging and discharging scheduling algorithm considering a detailed battery wear-out model to minimize operational cost as well as to prolong battery lifetime. Our approach significantly reduces total cost compared to the conventional method that does not consider battery wear-out. Extensive experiments for several scenarios exhibit that total cost is reduced by up to 70.6% while battery wear-out is also reduced by 53.6%. The virtue of the proposed framework is its wide applicability beyond sustainable BS and thus can be also used for other types of load in principle.

  14. Optimal route scheduling-driven study of a photovoltaic charging-station (parking lot) for electric mini-buses

    Science.gov (United States)

    Zacharaki, V.; Papanikolaou, S.; Voulgaraki, Ch; Karantinos, A.; Sioumpouras, D.; Tsiamitros, D.; Stimoniaris, D.; Maropoulos, S.; Stephanedes, Y.

    2016-11-01

    The objective of the present study is threefold: To highlight how electro-mobility can: (a) Contribute to the promotion of the environmental conservation of the rural areas (through an integrated solution for reducing the carbon footprint of road facilities and transport), (b) Enhance tourism-based economical development, (c) facilitate students in their daily transport and residents (elderly, disabled, distant-residents) in their daily on-demand transport. The overall goal is to design an energy-efficient, regional intelligent transportation system with innovative solar-energy charging-stations for e-vehicles in municipalities with many geographically scattered small villages and small cities. The innovative character of the study is that it tries to tackle all three specific objectives simultaneously and with the same means, since it utilizes Intelligent Transportation Systems (ITS). The study is adapted and applied to an area with the above characteristics, in order to demonstrate the proof of concept.

  15. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  16. Experience in scheduled maintenance

    International Nuclear Information System (INIS)

    Tsai, M.T.

    1985-01-01

    As outage management affects both the cost and reliability of a nuclear power plant, performance of a scheduled maintenance outage in an efficient and effective manner is an important task in the operation of nuclear power plant. This paper covers the experience gained in the past ten refueling outages for the two BWR units at the First Nuclear Power Station of Taipower. The key to optimizing both the cost and schedule of a refueling outage is to maintain a high level of quality workmanship. The outage management in planning, scheduling, preparation, coordination, and cooperation, accompanied by the qualified in-house capability and sufficient outside support, have placed the refueling outages at the FNPS in a well controlled situation and have established the capacity factors of these two BWR units at a level which is 20% higher than the world average in the past years

  17. Point Lepreau generating station

    International Nuclear Information System (INIS)

    Ganong, G.H.D.; Strang, A.E.; Gunter, G.E.; Thompson, T.S.

    Point Lepreau-1 reactor is a 600 MWe generating station expected to be in service by October 1979. New Brunswick is suffering a 'catch up' phenomenon in load growth and needs to decrease dependence on foreign oil. The site is on salt water and extensive study has gone into corrosion control. Project management, financing and scheduling have unique aspects. (E.C.B.)

  18. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    led several cost research initiatives in cloud computing, service-oriented architecture, and agile development and various independent schedule...and he supports DoD and federal acquisition efforts with a focus on rapid and agile practices to speed solutions with the lowest practical program...assessment, and risk management to control cost and deliver on time. A Government Accountability Office (GAO) assessment of 86 programs that made up the

  19. Fire Stations

    Data.gov (United States)

    Department of Homeland Security — Fire Stations in the United States Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their...

  20. Records Control Schedules Repository

    Data.gov (United States)

    National Archives and Records Administration — The Records Control Schedules (RCS) repository provides access to scanned versions of records schedules, or Standard Form 115, Request for Records Disposition...

  1. Electric power scheduling - A distributed problem-solving approach

    Science.gov (United States)

    Mellor, Pamela A.; Dolce, James L.; Krupp, Joseph C.

    1990-01-01

    Space Station Freedom's power system, along with the spacecraft's other subsystems, needs to carefully conserve its resources and yet strive to maximize overall Station productivity. Due to Freedom's distributed design, each subsystem must work cooperatively within the Station community. There is a need for a scheduling tool which will preserve this distributed structure, allow each subsystem the latitude to satisfy its own constraints, and preserve individual value systems while maintaining Station-wide integrity.

  2. Amtrak Stations

    Data.gov (United States)

    Department of Homeland Security — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  3. Widening the Schedulability Hierarchical Scheduling Systems

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; David, Alexandre; Kim, Jin Hyun

    2014-01-01

    This paper presents a compositional approach for schedula- bility analysis of hierarchical systems, which enables to prove more sys- tems schedulable by having richer and more detailed scheduling models. We use a lightweight method (statistical model checking) for design ex- ploration, easily ass...

  4. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  5. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  6. WVU Hydrogen Fuel Dispensing Station

    Energy Technology Data Exchange (ETDEWEB)

    Davis, William [West Virginia University Research Corporation, Morgantown, WV (United States)

    2015-09-01

    The scope of this project was changed during the course of the project. Phase I of the project was to construct a site similar to the site at Central West Virginia Regional Airport in Charleston, WV to show that duplication of the site was a feasible method of conducting hydrogen stations. Phase II of the project was necessitated due to a lack of funding that was planned for the development of the station in Morgantown. The US Department of Energy determined that the station in Charleston would be dismantled and moved to Morgantown and reassembled at the Morgantown site. This necessitated storage of the components of the station for almost a year at the NAFTC Headquarters which caused a number of issues with the equipment that will be discussed in later portions of this report. This report will consist of PHASE I and PHASE II with discussions on each of the tasks scheduled for each phase of the project.

  7. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  8. Station Capacity

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    the probability of conflicts and the minimum headway times into account. The last method analyzes how optimal platform tracks are used by examining the arrival and departure pattern of the trains. The developed methods can either be used separately to analyze specific characteristics of the capacity of a station...

  9. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  10. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  11. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  12. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  13. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  14. Broadcast scheduling with data bundles

    Science.gov (United States)

    Chen, Fangfei; Pizzocaro, Diego; Johnson, Matthew P.; Bar-Noy, Amotz; Preece, Alun; La Porta, Thomas

    2011-06-01

    Broadcast scheduling has been extensively studied in wireless environments, where a base station broadcasts data to multiple users. Due to the sole wireless channel's limited bandwidth, only a subset of the needs may be satisfiable, and so maximizing total (weighted) throughput is a popular objective. In many realistic applications, however, data are dependent or correlated in the sense that the joint utility of a set of items is not simply the sum of their individual utilities. On the one hand, substitute data may provide overlapping information, so one piece of data item may have lower value if a second data item has already been delivered; on the other hand, complementary data are more valuable than the sum of their parts, if, for example, one data item is only useful in the presence of a second data item. In this paper, we define a data bundle to be a set of data items with possibly nonadditive joint utility, and we study a resulting broadcast scheduling optimization problem whose objective is to maximize the utility provided by the data delivered.

  15. Electric power scheduling: A distributed problem-solving approach

    Science.gov (United States)

    Mellor, Pamela A.; Dolce, James L.; Krupp, Joseph C.

    1990-01-01

    Space Station Freedom's power system, along with the spacecraft's other subsystems, needs to carefully conserve its resources and yet strive to maximize overall Station productivity. Due to Freedom's distributed design, each subsystem must work cooperatively within the Station community. There is a need for a scheduling tool which will preserve this distributed structure, allow each subsystem the latitude to satisfy its own constraints, and preserve individual value systems while maintaining Station-wide integrity. The value-driven free-market economic model is such a tool.

  16. Effects of Block Scheduling

    Directory of Open Access Journals (Sweden)

    William R. Veal

    1999-09-01

    Full Text Available This study examined the effects of a tri-schedule on the academic achievement of students in a high school. The tri-schedule consists of traditional, 4x4 block, and hybrid schedules running at the same time in the same high school. Effectiveness of the schedules was determined from the state mandated test of basic skills in reading, language, and mathematics. Students who were in a particular schedule their freshman year were tested at the beginning of their sophomore year. A statistical ANCOVA test was performed using the schedule types as independent variables and cognitive skill index and GPA as covariates. For reading and language, there was no statistically significant difference in test results. There was a statistical difference mathematics-computation. Block mathematics is an ideal format for obtaining more credits in mathematics, but the block format does little for mathematics achievement and conceptual understanding. The results have content specific implications for schools, administrations, and school boards who are considering block scheduling adoption.

  17. Analysis of crimes committed against scheduled tribes

    Science.gov (United States)

    Khadse, Vivek P.; Akhil, P.; Anto, Christopher; Gnanasigamani, Lydia J.

    2017-11-01

    One of the curses to the society is a crime which has a deep impact on the society. Victims of crimes are the one who is impacted the most. All communities in the world are affected by crime and the criminal justice system, but largely impacted communities are the backward classes. There are many cases reported of crime committed against scheduled tribes from the year 2005 till date. This paper states the analysis of Crimes Committed against Scheduled Tribes in the year 2015 in various states and union territories in India. In this study, Multiple Linear regression techniques have been used to analyze the crimes committed against scheduled tribes’ community in India. This study compares the number of cases reported to the police station and rate of crime committed in different states in India. It also states the future prediction of the crime that would happen. It will also predict the number of cases of crime committed against the scheduled tribe that can be reported in future. The dataset which has been used in this study is taken from official Indian government repository for crimes which include different information of crimes committed against scheduled tribes in different states and union territories measured under the population census of the year 2011. This study will help different Indian states and union territory government to analyze and predict the future crimes that may occur and take appropriate measures against it before the actual crime would occur.

  18. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  19. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    Despite several attempts to accurately predict duration and cost of software projects, initial plans still do not reflect real-life situations. Since commitments with customers are usually decided based on these initial plans, software companies frequently fail to deliver on time and many projects...... overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...

  20. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  1. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  2. Childhood Vaccine Schedule

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... please turn Javascript on. When to Vaccinate What Vaccine Why Birth (or any age if not previously ...

  3. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    the predominant scheduling method since it was introduced in the late 1950s. Over the years, CPM has proven to be a very powerful technique for planning, scheduling and controlling projects, which among other things is indicated by the development of a large number of CPM-based software applications available...... on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...

  4. CERN confirms LHC schedule

    CERN Multimedia

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  5. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  6. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  7. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    Typically, ground staff scheduling is centrally planned for each terminal in an airport. The advantage of this is that the staff is efficiently utilized, but a disadvantage is that staff spends considerable time walking between stands. In this paper a decentralized approach for ground staff...... scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...

  8. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  9. case study of afam power station

    African Journals Online (AJOL)

    NIJOTECH

    replacement, and verification or checking of emergency failure of components or equipment. (b) Setting up and performing scheduled periodic preventive inspections, replacements or repairs. (c) Repair activities in a central facility on failed and replaced items arriving from different operating stations [1]. Unfortunately, the ...

  10. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  11. Genetic Algorithms for Satellite Scheduling Problems

    Directory of Open Access Journals (Sweden)

    Fatos Xhafa

    2012-01-01

    Full Text Available Recently there has been a growing interest in mission operations scheduling problem. The problem, in a variety of formulations, arises in management of satellite/space missions requiring efficient allocation of user requests to make possible the communication between operations teams and spacecraft systems. Not only large space agencies, such as ESA (European Space Agency and NASA, but also smaller research institutions and universities can establish nowadays their satellite mission, and thus need intelligent systems to automate the allocation of ground station services to space missions. In this paper, we present some relevant formulations of the satellite scheduling viewed as a family of problems and identify various forms of optimization objectives. The main complexities, due highly constrained nature, windows accessibility and visibility, multi-objectives and conflicting objectives are examined. Then, we discuss the resolution of the problem through different heuristic methods. In particular, we focus on the version of ground station scheduling, for which we present computational results obtained with Genetic Algorithms using the STK simulation toolkit.

  12. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  13. Fuzzy HRRN CPU Scheduling Algorithm

    OpenAIRE

    Bashir Alam; R. Biswas; M. Alam

    2011-01-01

    There are several scheduling algorithms like FCFS, SRTN, RR, priority etc. Scheduling decisions of these algorithms are based on parameters which are assumed to be crisp. However, in many circumstances these parameters are vague. The vagueness of these parameters suggests that scheduler should use fuzzy technique in scheduling the jobs. In this paper we have proposed a novel CPU scheduling algorithm Fuzzy HRRN that incorporates fuzziness in basic HRRN using fuzzy Technique FIS.

  14. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  15. Iterative robust multiprocessor scheduling

    NARCIS (Netherlands)

    Adyanthaya, S.; Geilen, M.; Basten, T.; Voeten, J.; Schiffelers, R.

    2015-01-01

    General purpose platforms are characterized by unpredictable timing behavior. Real-time schedules of tasks on general purpose platforms need to be robust against variations in task execution times. We define robustness in terms of the expected number of tasks that miss deadlines. We present an

  16. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  17. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  18. A knowledge-based decision support system for payload scheduling

    Science.gov (United States)

    Tyagi, Rajesh; Tseng, Fan T.

    1988-01-01

    This paper presents the development of a prototype Knowledge-based Decision Support System, currently under development, for scheduling payloads/experiments on space station missions. The DSS is being built on Symbolics, a Lisp machine, using KEE, a commercial knowledge engineering tool.

  19. Evaluation of a Cross Layer Scheduling Algorithm for LTE Downlink

    DEFF Research Database (Denmark)

    Popovska Avramova, Andrijana; Yan, Ying; Dittmann, Lars

    2013-01-01

    The LTE standard is a leading standard in the wireless broadband market. The Radio Resource Management at the base station plays a major role in satisfying users demand for high data rates and quality of service. This paper evaluates a cross layer scheduling algorithm that aims at minimizing...

  20. Downlink scheduling using non-orthogonal uplink beams

    KAUST Repository

    Eltayeb, Mohammed E.

    2014-04-01

    Opportunistic schedulers rely on the feedback of the channel state information of users in order to perform user selection and downlink scheduling. This feedback increases with the number of users, and can lead to inefficient use of network resources and scheduling delays. We tackle the problem of feedback design, and propose a novel class of nonorthogonal codes to feed back channel state information. Users with favorable channel conditions simultaneously transmit their channel state information via non-orthogonal beams to the base station. The proposed formulation allows the base station to identify the strong users via a simple correlation process. After deriving the minimum required code length and closed-form expressions for the feedback load and downlink capacity, we show that i) the proposed algorithm reduces the feedback load while matching the achievable rate of full feedback algorithms operating over a noiseless feedback channel, and ii) the proposed codes are superior to the Gaussian codes.

  1. Routing and scheduling problems

    DEFF Research Database (Denmark)

    Reinhardt, Line Blander

    be that the objects routed have an availability time window and a delivery time window or that locations on the path have a service time window. When routing moving transportation objects such as vehicles and vessels schedules are made in connection with the routing. Such schedules represent the time for the presence......In today’s globalized society, transport contributes to our daily life in many different ways. The production of the parts for a shelf ready product may take place on several continents and our travel between home and work, vacation travel and business trips has increased in distance the last...... couple of decades. To deliver competitive service and price, transportation today needs to be cost effective. A company requiring for things to be shipped will aim at having the freight shipped as cheaply as possible while often satisfying certain time constraints. For the transportation company...

  2. CMS Multicore Scheduling Strategy

    CERN Document Server

    Perez-Calero Yzquierdo, Antonio

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue Moores Law style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications. Also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multi-core jobs on the GRID based on the glideIn WMS submission infrastructure. We will present the individual components of the strategy, from special site specific queues used during provisioning of resources and implications to scheduling; to dynamic partitioning within a single pilot to allow to transition to multi-core or whole-node scheduling on site level without disallowing single-core jobs. In this presentation, we will present the experiences mad...

  3. The JFACC Planner/Scheduler

    National Research Council Canada - National Science Library

    2002-01-01

    ... (the JFACC Planner/Scheduler, or JPS) that supports generation of tightly linked air operations plans and schedules, as well as their adaptation in response to changing tasks and resource availability...

  4. Block Scheduling in High Schools.

    Science.gov (United States)

    Irmsher, Karen

    1996-01-01

    Block Scheduling has been considered a cure for a lengthy list of educational problems. This report reviews the literature on block schedules and describes some Oregon high schools that have integrated block scheduling. Major disadvantages included resistance to change and requirements that teachers change their teaching strategies. There is…

  5. Guidelines for Learning Stations.

    Science.gov (United States)

    Fehrle, Carl C.; Schulz, Jolene

    Guidelines for designing and planning learning stations for pupils at the elementary grade level include suggestions on how to develop a station that will be successful in meeting the learners' needs. Instructions for the use of tapes at a station and matching pupils with stations are given, as are guidelines on classroom arrangement and record…

  6. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  7. Locomotive Schedule Optimization for Da-qin Heavy Haul Railway

    Directory of Open Access Journals (Sweden)

    Ruiye Su

    2015-01-01

    Full Text Available The main difference between locomotive schedule of heavy haul railways and that of regular rail transportation is the number of locomotives utilized for one train. One heavy-loaded train usually has more than one locomotive, but a regular train only has one. This paper develops an optimization model for the multilocomotive scheduling problem (MLSP through analyzing the current locomotive schedule of Da-qin Railway. The objective function of our paper is to minimize the total number of utilized locomotives. The MLSP is nondeterministic polynomial (NP hard. Therefore, we convert the multilocomotive traction problem into a single-locomotive traction problem. Then, the single-locomotive traction problem (SLTP can be converted into an assignment problem. The Hungarian algorithm is applied to solve the model and obtain the optimal locomotive schedule. We use the variance of detention time of locomotives at stations to evaluate the stability of locomotive schedule. In order to evaluate the effectiveness of the proposed optimization model, case studies for 20 kt and 30 kt heavy-loaded combined trains on Da-qin Railway are both conducted. Compared to the current schedules, the optimal schedules from the proposed models can save 62 and 47 locomotives for 20 kt and 30 kt heavy-loaded combined trains, respectively. Therefore, the effectiveness of the proposed model and its solution algorithm are both valid.

  8. Installation of Ohio's First Electrolysis-Based Hydrogen Fueling Station

    Science.gov (United States)

    Scheidegger, Brianne T.; Lively, Michael L.

    2012-01-01

    This paper describes progress made towards the installation of a hydrogen fueling station in Northeast Ohio. In collaboration with several entities in the Northeast Ohio area, the NASA Glenn Research Center is installing a hydrogen fueling station that uses electrolysis to generate hydrogen on-site. The installation of this station is scheduled for the spring of 2012 at the Greater Cleveland Regional Transit Authority s Hayden bus garage in East Cleveland. This will be the first electrolysis-based hydrogen fueling station in Ohio.

  9. New Approaches to Irrigation Scheduling of Vegetables

    Directory of Open Access Journals (Sweden)

    Michael D. Cahn

    2017-04-01

    Full Text Available Using evapotranspiration (ET data for scheduling irrigations on vegetable farms is challenging due to imprecise crop coefficients, time consuming computations, and the need to simultaneously manage many fields. Meanwhile, the adoption of soil moisture monitoring in vegetables has historically been limited by sensor accuracy and cost, as well as labor required for installation, removal, and collection of readings. With recent improvements in sensor technology, public weather-station networks, satellite and aerial imaging, wireless communications, and cloud computing, many of the difficulties in using ET data and soil moisture sensors for irrigation scheduling of vegetables can now be addressed. Web and smartphone applications have been developed that automate many of the calculations involved in ET-based irrigation scheduling. Soil moisture sensor data can be collected through wireless networks and accessed using web browser or smartphone apps. Energy balance methods of crop ET estimation, such as eddy covariance and Bowen ratio, provide research options for further developing and evaluating crop coefficient guidelines of vegetables, while recent advancements in surface renewal instrumentation have led to a relatively low-cost tool for monitoring crop water requirement in commercial farms. Remote sensing of crops using satellite, manned aircraft, and UAV platforms may also provide useful tools for vegetable growers to evaluate crop development, plant stress, water consumption, and irrigation system performance.

  10. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  11. System and Method for Network Bandwidth, Buffers and Timing Management Using Hybrid Scheduling of Traffic with Different Priorities and Guarantees

    Science.gov (United States)

    Varadarajan, Srivatsan (Inventor); Hall, Brendan (Inventor); Smithgall, William Todd (Inventor); Bonk, Ted (Inventor); DeLay, Benjamin F. (Inventor)

    2017-01-01

    Systems and methods for network bandwidth, buffers and timing management using hybrid scheduling of traffic with different priorities and guarantees are provided. In certain embodiments, a method of managing network scheduling and configuration comprises, for each transmitting end station, reserving one exclusive buffer for each virtual link to be transmitted from the transmitting end station; for each receiving end station, reserving exclusive buffers for each virtual link to be received at the receiving end station; and for each switch, reserving a exclusive buffer for each virtual link to be received at an input port of the switch. The method further comprises determining if each respective transmitting end station, receiving end station, and switch has sufficient capability to support the reserved buffers; and reporting buffer infeasibility if each respective transmitting end station, receiving end station, and switch does not have sufficient capability to support the reserved buffers.

  12. The marginal social cost of headway for a scheduled service

    DEFF Research Database (Denmark)

    Fosgerau, Mogens

    2009-01-01

    This brief paper derives the marginal social cost of headway for a scheduled service, i.e. the cost for users of marginal increases to the time interval between departures. In brief we may call it the value of headway in analogy with the value of travel time and the value of reliability. Users have...... waiting time costs as well as schedule delay costs measured relative to their desired time of arrival at the destination. They may either arrive at the station to choose just the next departure or they may plan for a specific departure in which case they incur also a planning cost. Then planning...

  13. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    to scheduling problems with temporal dependencies between tasks. However, these problems appear in various contexts and with different properties. A group of the problems considered are related to vehicle routing problems, where transportation and time windows are important factors that must be accounted for....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied....... Column generation is an iterative exact solution method based on the theory of linear programming and is capable of providing provably optimal solutions. In some of the applications, the approach is modified to provide feasible solutions of high-quality in less time. The exceptional solution quality...

  14. Le Nordais on schedule

    International Nuclear Information System (INIS)

    Anon.

    1998-01-01

    The first phase of the Le Nordais wind farm project in the Gaspe Peninsula in Quebec is on schedule. It was announced that the project's first turbines will be turning by September 1998. Hydro-Quebec has agreed to buy power from the 100 MW wind farm. The Le Nordais consortium plans to have 76,750 kW turbines in service in Cap-Chat by December 1998. Many of the foundations for the towers are poured and a substation is under construction. The turbines that are currently in use come from Denmark, but 20 of the 76 turbines being slated for installation this year will come from NEG Micon Canada Inc.'s assembly plant in Quebec. The Quebec government is providing a $5.6 million grant for their production and for turbine assembly in Quebec. During phase two, an additional 57 turbines will be installed in Matane by the end of 1999. 1 fig

  15. Water Level Station History

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Images contain station history information for 175 stations in the National Water Level Observation Network (NWLON). The NWLON is a network of long-term,...

  16. Fire Stations - 2009

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Stations in Kansas Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their jobs is...

  17. Fire Stations - 2007

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Station Locations in Kansas Any location where fire fighters are stationed at or based out of, or where equipment that such personnel use in carrying out their...

  18. Weather Radar Stations

    Data.gov (United States)

    Department of Homeland Security — These data represent Next-Generation Radar (NEXRAD) and Terminal Doppler Weather Radar (TDWR) weather radar stations within the US. The NEXRAD radar stations are...

  19. Newport Research Station

    Data.gov (United States)

    Federal Laboratory Consortium — The Newport Research Station is the Center's only ocean-port research facility. This station is located at Oregon State University's Hatfield Marine Science Center,...

  20. Streamflow Gaging Stations

    Data.gov (United States)

    Department of Homeland Security — This map layer shows selected streamflow gaging stations of the United States, Puerto Rico, and the U.S. Virgin Islands, in 2013. Gaging stations, or gages, measure...

  1. Big Game Reporting Stations

    Data.gov (United States)

    Vermont Center for Geographic Information — Point locations of big game reporting stations. Big game reporting stations are places where hunters can legally report harvested deer, bear, or turkey. These are...

  2. Ocean Station Vessel

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ocean Station Vessels (OSV) or Weather Ships captured atmospheric conditions while being stationed continuously in a single location. While While most of the...

  3. Hammond Bay Biological Station

    Data.gov (United States)

    Federal Laboratory Consortium — Hammond Bay Biological Station (HBBS), located near Millersburg, Michigan, is a field station of the USGS Great Lakes Science Center (GLSC). HBBS was established by...

  4. Reference Climatological Stations

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Reference Climatological Stations (RCS) network represents the first effort by NOAA to create and maintain a nationwide network of stations located only in areas...

  5. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  6. Approach to transaction management for Space Station Freedom

    Science.gov (United States)

    Easton, C. R.; Cressy, Phil; Ohnesorge, T. E.; Hector, Garland

    1989-01-01

    An approach to managing the operations of the Space Station Freedom based on their external effects is described. It is assumed that there is a conflict-free schedule that, if followed, will allow only appropriate operations to occur. The problem is then reduced to that of ensuring that the operations initiated are within the limits allowed by the schedule, or that the external effects of such operations are within those allowed by the schedule. The main features of the currently adopted transaction management approach are discussed.

  7. Darlington Station outage - a maintenance perspective

    Energy Technology Data Exchange (ETDEWEB)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K. [Ontario Hydro, Darlington Nuclear Generating Station, Bowmanville, ON (Canada)

    1997-07-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  8. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  9. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  10. INTERACT Station Catalogue - 2015

    DEFF Research Database (Denmark)

    and research groups. Therefore, INTERACT has produced a catalogue of research stations including descriptions of the physical setting, facilities and services offered at the stations. It is our hope that this catalogue will help researchers identify research stations that suit their specific needs. The 2015......INTERACT stations are located in all major environmental envelopes of the Arctic providing an ideal platform for studying climate change and its impact on the environment and local communities. Since alpine environments face similar changes and challenges as the Arctic, the INTERACT network also...... includes some alpine stations located outside the Arctic. The INTERACT research stations provide an ideal platform for circumarctic research and monitoring. Activities span from small short term research projects to larger long term monitoring programmes. The stations are thus visited by many researchers...

  11. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  12. Scheduling in the operating theatre.

    OpenAIRE

    Rose, M. B.; Davies, D. C.

    1984-01-01

    The effect of scheduling on the use of operating theatre time has been studied. Scheduling involved determining the average length of common operations and fitting them into the calculated available operating time. The technique has been shown to reduce significantly the variation in length of operating sessions, and it ensures the best use of available operating time.

  13. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  14. Bulletin publication schedule

    CERN Multimedia

    Publications Section, DG-CO Group

    2011-01-01

    The final edition (Nos 51-52/2011 and 1-2-3/2012) of the Bulletin this year will be published on Friday 16 December and will cover events at CERN from 19 December 2011 to 19 January 2012. Announcements for publication in this issue should reach the Communication Group or the Staff Association, as appropriate, by noon on Tuesday 13 December. Bulletin publication schedule for 2012 The table below lists the 2012 publication dates for the paper version of the Bulletin and the corresponding deadlines for the submission of announcements. Please note that all announcements must be submitted by 12.00 noon on Tuesdays at the latest.   Bulletin No. Week number Submission of announcements (before 12.00 midday) Bulletin Web version Bulletin Printed version 4-5   Tuesday 17 January Fridays 20 and 27 January Wednesday25 January 6-7   Tuesday 31 January Fridays 3 and 10 February Wednesday 8 February 8-9 Tuesday 14 February Fridays 17 and 24 february Wednesday 22 Februa...

  15. Astronaut Office Scheduling System Software

    Science.gov (United States)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  16. Range Scheduling Automation for the Air Force Satellite Control Network: A Case Study in Computer System Development

    Science.gov (United States)

    1992-09-01

    ECP Engineering Change Proposal FQT Functional Qualification Test GPS Globil Positioning System GTS Guam Tracking Station HTS Hawaii Tracking Station...operational environment for which the two range scheduling automation projects were developed, it is important to understand the AFSCN range scheduling...of the two efforts? The literature review in Chapter II discusses the software acquisition problem in the Department of Defense (DOD) environment and

  17. Multimodal processes scheduling in mesh-like network environment

    Directory of Open Access Journals (Sweden)

    Bocewicz Grzegorz

    2015-06-01

    Full Text Available Multimodal processes planning and scheduling play a pivotal role in many different domains including city networks, multimodal transportation systems, computer and telecommunication networks and so on. Multimodal process can be seen as a process partially processed by locally executed cyclic processes. In that context the concept of a Mesh-like Multimodal Transportation Network (MMTN in which several isomorphic subnetworks interact each other via distinguished subsets of common shared intermodal transport interchange facilities (such as a railway station, bus station or bus/tram stop as to provide a variety of demand-responsive passenger transportation services is examined. Consider a mesh-like layout of a passengers transport network equipped with different lines including buses, trams, metro, trains etc. where passenger flows are treated as multimodal processes. The goal is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multimodal transportation processes scheduling encompassing passenger flow itineraries. Then, the main objective is to provide conditions guaranteeing solvability of particular transport lines scheduling, i.e. guaranteeing the right match-up of local cyclic acting bus, tram, metro and train schedules to a given passengers flow itineraries.

  18. Scheduling in Sensor Grid Middleware for Telemedicine Using ABC Algorithm

    Directory of Open Access Journals (Sweden)

    T. Vigneswari

    2014-01-01

    Full Text Available Advances in microelectromechanical systems (MEMS and nanotechnology have enabled design of low power wireless sensor nodes capable of sensing different vital signs in our body. These nodes can communicate with each other to aggregate data and transmit vital parameters to a base station (BS. The data collected in the base station can be used to monitor health in real time. The patient wearing sensors may be mobile leading to aggregation of data from different BS for processing. Processing real time data is compute-intensive and telemedicine facilities may not have appropriate hardware to process the real time data effectively. To overcome this, sensor grid has been proposed in literature wherein sensor data is integrated to the grid for processing. This work proposes a scheduling algorithm to efficiently process telemedicine data in the grid. The proposed algorithm uses the popular swarm intelligence algorithm for scheduling to overcome the NP complete problem of grid scheduling. Results compared with other heuristic scheduling algorithms show the effectiveness of the proposed algorithm.

  19. Non-Coop Station History

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Station history documentation for stations outside the US Cooperative Observer network. Primarily National Weather Service stations assigned WBAN station IDs. Other...

  20. Space station GN&C overview for payloads

    Science.gov (United States)

    Treder, Alfred J.

    1999-01-01

    The Guidance, Navigation, and Control (GN&C) function on the International Space Station (ISS) determines navigation parameters (state vector, attitude, angular rate, pointing data, time), maintains Station attitude (non propulsively as a rule but propulsively when necessary), executes translation and reboost maneuvers, and supports microgravity experiments by limiting accelerations. The accuracies to which GN&C is to perform its functions are summarized, and then the expected performance of the current GN&C design is described, including pointing accuracy. Attitude bounds are illustrated as a function of calendar date given the current (Revision D) station assembly sequence and schedule.

  1. Autonomous power system: Integrated scheduling

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA Lewis Research Center is designed to demonstrate the abilities of integrated intelligent diagnosis, control and scheduling techniques to space power distribution hardware. The project consists of three elements: the Autonomous Power Expert System (APEX) for fault diagnosis, isolation, and recovery (FDIR), the Autonomous Intelligent Power Scheduler (AIPS) to determine system configuration, and power hardware (Brassboard) to simulate a space-based power system. Faults can be introduced into the Brassboard and in turn, be diagnosed and corrected by APEX and AIPS. The Autonomous Intelligent Power Scheduler controls the execution of loads attached to the Brassboard. Each load must be executed in a manner that efficiently utilizes available power and satisfies all load, resource, and temporal constraints. In the case of a fault situation on the Brassboard, AIPS dynamically modifies the existing schedule in order to resume efficient operation conditions. A database is kept of the power demand, temporal modifiers, priority of each load, and the power level of each source. AIPS uses a set of heuristic rules to assign start times and resources to each load based on load and resource constraints. A simple improvement engine based upon these heuristics is also available to improve the schedule efficiency. This paper describes the operation of the Autonomous Intelligent Power Scheduler as a single entity, as well as its integration with APEX and the Brassboard. Future plans are discussed for the growth of the Autonomous Intelligent Power Scheduler.

  2. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  3. Amtrak Rail Stations (National)

    Data.gov (United States)

    Department of Transportation — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  4. Cooperative Station History Forms

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Various forms, photographs and correspondence documenting the history of Cooperative station instrumentation, location changes, inspections, and...

  5. Second unit scheduling concerns on a dual-unit nuclear project

    International Nuclear Information System (INIS)

    Block, H.R.; Mazzini, R.A.

    1978-01-01

    This paper explores the planning and scheduling problems of Unit 2 of the Susquehanna steam electric station. The causes of these problems and methods to avoid or mitigate their consequences are discussed. The Susquehanna steam electric station has two boiling water reactors rated at 1,100 MW each. Topics considered include cost factors, structures, equipment, engineering and home office, construction services, completion data phasing, work sequencing, structural dependences, and segregation. Substatial cost and schedule benefits can result if two nuclear units are designed and constructed as one integral station, and if maximum sharing of facilities and services between the units occurs. It is concluded that the cost benefits of highly integrated dual unit construction outweigh the schedule and logistical problems caused by that approach

  6. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  7. When greediness fails: examples from stochastic scheduling

    NARCIS (Netherlands)

    Uetz, Marc Jochen

    2003-01-01

    The purpose of this paper is to present examples for the sometimes surprisingly different behavior of deterministic and stochastic scheduling problems. In particular, it demonstrates some seemingly counterintuitive properties of optimal scheduling policies for stochastic machine scheduling problems.

  8. Immunization Schedules for Preteens and Teens

    Science.gov (United States)

    ... Vaccines: The Basics Immunization Schedule for Preteens and Teens (7 through 18 Years) Recommend on Facebook Tweet ... 2018 Immunization Schedule Recommended Vaccinations for Preteens and Teens Schedule for preteens and teens (7 through 18 ...

  9. Scheduling Spitzer: The SIRPASS Story

    Science.gov (United States)

    Mittman, David S.; Hawkins, Robert

    2013-01-01

    NASA's Spitzer Space Telescope was launched on August 25, 2003 from Florida's Cape Canaveral Air Force Base. Drifting in a unique Earth-trailing orbit around the Sun, Spitzer sees an optically invisible universe dominated by dust and stars. Since 1997, the Spitzer Integrated Resource Planning and Scheduling System (SIRPASS) has helped produce spacecraft activity plans for the Spitzer Space Telescope. SIRPASS is used by members of the Observatory Planning and Scheduling Team to plan, schedule and sequence the Telescope from data made available to them from the science and engineering community. Because of the volume of data that needs to be scheduled, SIRPASS offers a variety of automated assistants to aid in this task. This paper will describe the functional elements of the SIRPASS software system -- emphasizing the role that automation plays in the system -- and will highlight lessons learned for the software developer from a decade of Spitzer Space Telescope operations experience.

  10. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  11. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  12. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  13. COMPLEX EVALUATION OF THE STATE AND QUALITY OF RAILWAY STATION OPERATING

    Directory of Open Access Journals (Sweden)

    D. O. Polishchuk

    2014-02-01

    Full Text Available Purpose. Improvement of existing methods for evaluation of condition and functioning quality of railway stations and development of the new ones in order to improve operation of railway stations. Methodology. During research the local, prognostic, aggregated and interactive analyses of condition and functioning quality of station infrastructure elements and train processing at the stations were applied. Local evaluations are obtained as the result of scheduled and off-schedule surveys. On the basis of local evaluations, aggregated evaluations of different generalization level are applied. Method for interactive evaluation is based on the analysis of compliance with train tables. Method of prognostic analysis applies the prehistory of evaluations obtained during previous surveys. Findings. Resulting from researches held, the complex determinative approach was proposed for evaluation of station sector of Ukrainian Railways. This approach allows determining comprehensive and objective notion about station, functioning quality and interaction between objects of station sector. Originality. Existing method for station infrastructure elements evaluation was improved. Proposed method for interactive evaluation allows performing continuous observation of station functioning quality between scheduled surveys. Practical value. Proposed methodology for complex evaluation may be applied to structural units of station sector of different hierarchy levels. Software developed allows navigating promptly over evaluation results and localizing drawbacks discovered.

  14. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  15. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  16. Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 9)* -A Fast Scheduling Method-

    OpenAIRE

    Yoichi, NAKAMURA; Susumu, YAMASHIRO

    1986-01-01

    A scheduling method for electric power systems is reported. The schedule is made to satisfy the limits of both system security and environmental pollution. The limit of system security is considered as the probability of the power supply. And power supply is considered possible only when every power flow satisfies each transmission line’s capacity in this report. Each thermal unit and line are considered to suffer a failure probabilistically. The nitrogen oxide emission from thermal stations ...

  17. Workload Schedulers - Genesis, Algorithms and Comparisons

    OpenAIRE

    Sliwko, L.; Getov, Vladimir

    2015-01-01

    In this article we provide brief descriptions of three classes of schedulers: Operating Systems Process Schedulers, Cluster Systems, Jobs Schedulers and Big Data Schedulers. We describe their evolution from early adoptions to modern implementations, considering both the use and features of algorithms. In summary, we discuss differences between all presented classes of schedulers and discuss their chronological development. In conclusion, we highlight similarities in the focus of scheduling st...

  18. Non-clairvoyant Scheduling Games

    Science.gov (United States)

    Dürr, Christoph; Nguyen, Kim Thang

    In a scheduling game, each player owns a job and chooses a machine to execute it. While the social cost is the maximal load over all machines (makespan), the cost (disutility) of each player is the completion time of its own job. In the game, players may follow selfish strategies to optimize their cost and therefore their behaviors do not necessarily lead the game to an equilibrium. Even in the case there is an equilibrium, its makespan might be much larger than the social optimum, and this inefficiency is measured by the price of anarchy - the worst ratio between the makespan of an equilibrium and the optimum. Coordination mechanisms aim to reduce the price of anarchy by designing scheduling policies that specify how jobs assigned to a same machine are to be scheduled. Typically these policies define the schedule according to the processing times as announced by the jobs. One could wonder if there are policies that do not require this knowledge, and still provide a good price of anarchy. This would make the processing times be private information and avoid the problem of truthfulness. In this paper we study these so-called non-clairvoyant policies. In particular, we study the RANDOM policy that schedules the jobs in a random order without preemption, and the EQUI policy that schedules the jobs in parallel using time-multiplexing, assigning each job an equal fraction of CPU time.

  19. Solar-Assisted Electric Vehicle Charging Station Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Lapsa, Melissa Voss [ORNL; Durfee, Norman [ORNL; Maxey, L Curt [ORNL; Overbey, Randall M [ORNL

    2011-09-01

    Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data

  20. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  1. Secure base stations

    NARCIS (Netherlands)

    Bosch, Peter; Brusilovsky, Alec; McLellan, Rae; Mullender, Sape J.; Polakos, Paul

    2009-01-01

    With the introduction of the third generation (3G) Universal Mobile Telecommunications System (UMTS) base station router (BSR) and fourth generation (4G) base stations, such as the 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) Evolved Node B (eNB), it has become important to

  2. Ondergronds Station Blijdorp, Rotterdam

    NARCIS (Netherlands)

    Hijma, M.P.|info:eu-repo/dai/nl/266562426; Cohen, K.M.|info:eu-repo/dai/nl/185633374

    2014-01-01

    Het is in de herfst van 2005. Een lief meisje, Marieke, rijdt op haar vouwfiets door Rotterdam. Bij het Centraal Station is het al tijden een grote bouwplaats. Onder de nieuwe hal komt een veel groter metrostation en ook onder de Statenweg in Blijdorp is een grote bouwput voor een nieuw station.

  3. SPS rectifier stations

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    The first of the twelves SPS rectifier stations for the bending magnets arrived at CERN at the end of the year. The photograph shows a station with the rectifiers on the left and in the other three cubicles the chokes, capacitors and resistor of the passive filter.

  4. Meyrin Petrol Station

    CERN Multimedia

    2006-01-01

    Please note that the Meyrin petrol station will be closed for maintenance work on Tuesday 19 and Wednesday 20 December 2006. If you require petrol during this period we invite you to use the Prévessin petrol station, which will remain open. TS-IC-LO Section Tel.: 77039 - 73793

  5. The Roman stational liturgy

    Directory of Open Access Journals (Sweden)

    Janusz Mieczkowski

    2012-03-01

    Full Text Available The papal stational liturgy in Rome was a particular kind of worship service from the Christian Antiquity to the XIV century. Its essential elements are four. Its always took place under the leadership of the pope or his representative. This form of liturgy was mobile: it was celebrated in different basilicas or churches of Rome. Third, the choice of church depended on the feast, liturgical seasons or commemoration being celebrated. Fourth, the stational liturgy was the urban liturgical celebration of the day. The highpoint of this system was Lent. Throughout the entire system Church of Rome manifested its own unity. The station was usually the Pope’s solemn mass in the stational church for the whole city. But on certain days in the year the Pope went in another church (collecta, from which a solemn procession was made to the stational church.

  6. [STEM on Station Education

    Science.gov (United States)

    Lundebjerg, Kristen

    2016-01-01

    The STEM on Station team is part of Education which is part of the External Relations organization (ERO). ERO has traditional goals based around BHAG (Big Hairy Audacious Goal). The BHAG model is simplified to a saying: Everything we do stimulates actions by others to advance human space exploration. The STEM on Station education initiate is a project focused on bringing off the earth research and learning into classrooms. Educational resources such as lesson plans, activities to connect with the space station and STEM related contests are available and hosted by the STEM on Station team along with their partners such as Texas Instruments. These educational activities engage teachers and students in the current happenings aboard the international space station, inspiring the next generation of space explorers.

  7. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .... Return of Partnership Income), Schedule D (Capital Gains and Losses), Schedule K-1 (Partner's Share of...' Capital Accounts), and Schedule M-3 (Net Income (Loss) Reconciliation for Certain Partnerships)). DATES... Partnership Income (Form 1065), Capital Gains and Losses (Schedule D), Partner's Share of Income, Credits...

  8. Report on Darlington nuclear generating station

    International Nuclear Information System (INIS)

    1985-12-01

    The Select Committee on Energy was appointed on July 10, 1985 by the Legislative Assembly of the Province of Ontario in order to inquire into and report on Ontario Hydro affairs within ten months. Two sessions were planned the first of which was a review of the Darlington Nuclear Generating Station. Darlington is a large, 4 unit nuclear-powered electricity generating station currently under construction on the shore of Lake Ontario in the town of Newcastle. At the time the Committee met, construction had been underway for over four years. The first two units are scheduled to become operational in 1988 and 1989 with the second two scheduled to become operational in 1991 and 1992. The total estimated cost of the station is $10.895 billion of which $3.66 billion has been spent and $3.385 billion has been committed. Though the nuclear industry has been a major area of investment in Ontario over the past decade, the demand for electrical power from nuclear stations has been significantly decreased. This report focusses on the need for Darlington and public policy issues involved in planning and completing it. The Committee proposed the following recommendations: 1) The relationship between the Government of Ontario and Ontario Hydro and their individual responsibilities should be clarified. 2) An independent review of the Ontario Hydro demand/supply options should be carried out. 3) No further significant contracts for Darlington units 3 and 4 should be let for materials not required for construction during the next 6 months while the Committee studies demand and supply options

  9. Mathematical model for estimating of technical and technological indicators of railway stations operation

    Directory of Open Access Journals (Sweden)

    D.M. Kozachenko

    2013-06-01

    Full Text Available Purpose. The article aims to create a mathematical model of the railway station functioning for the solving of problems of station technology development on the plan-schedule basis. Methodology. The methods of graph theory and object-oriented analysis are used as research methods. The model of the station activity plan-schedule includes a model of technical equipment of the station (plan-schedule net and a model of the station functioning , which are formalized on the basis of parametric graphs. Findings. The presented model is implemented as an application to the graphics package AutoCAD. The software is developed in Visual LISP and Visual Basic. Taking into account that the construction of the plan-schedule is mostly a traditional process of adding, deleting, and modifying of icons, the developed interface is intuitively understandable for a technologist and practically does not require additional training. Originality. A mathematical model was created on the basis of the theory of graphs and object-oriented analysis in order to evaluate the technical and process of railway stations indicators; it is focused on solving problems of technology development of their work. Practical value. The proposed mathematical model is implemented as an application to the graphics package of AutoCAD. The presence of a mathematical model allows carrying out an automatic analysis of the plan-schedule and, thereby, reducing the period of its creation more than twice.

  10. Space station operations management

    Science.gov (United States)

    Cannon, Kathleen V.

    1989-01-01

    Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

  11. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  12. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  13. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  14. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  15. Automated and dynamic scheduling for geodetic VLBI - A simulation study for AuScope and global networks

    Science.gov (United States)

    Iles, E. J.; McCallum, L.; Lovell, J. E. J.; McCallum, J. N.

    2018-02-01

    As we move into the next era of geodetic VLBI, the scheduling process is one focus for improvement in terms of increased flexibility and the ability to react with changing conditions. A range of simulations were conducted to ascertain the impact of scheduling on geodetic results such as Earth Orientation Parameters (EOPs) and station coordinates. The potential capabilities of new automated scheduling modes were also simulated, using the so-called 'dynamic scheduling' technique. The primary aim was to improve efficiency for both cost and time without losing geodetic precision, particularly to maximise the uses of the Australian AuScope VLBI array. We show that short breaks in observation will not significantly degrade the results of a typical 24 h experiment, whereas simply shortening observing time degrades precision exponentially. We also confirm the new automated, dynamic scheduling mode is capable of producing the same standard of result as a traditional schedule, with close to real-time flexibility. Further, it is possible to use the dynamic scheduler to augment the 3 station Australian AuScope array and thereby attain EOPs of the current global precision with only intermittent contribution from 2 additional stations. We thus confirm automated, dynamic scheduling bears great potential for flexibility and automation in line with aims for future continuous VLBI operations.

  16. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use of...

  17. Gain scheduling using the youla parameterization

    DEFF Research Database (Denmark)

    Niemann, H.H.; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector theta cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector theta has been derived by using the Youla parameterization...

  18. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  19. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  20. Optimal randomized scheduling by replacement

    Energy Technology Data Exchange (ETDEWEB)

    Saias, I.

    1996-05-01

    In the replacement scheduling problem, a system is composed of n processors drawn from a pool of p. The processors can become faulty while in operation and faulty processors never recover. A report is issued whenever a fault occurs. This report states only the existence of a fault but does not indicate its location. Based on this report, the scheduler can reconfigure the system and choose another set of n processors. The system operates satisfactorily as long as, upon report of a fault, the scheduler chooses n non-faulty processors. We provide a randomized protocol maximizing the expected number of faults the system can sustain before the occurrence of a crash. The optimality of the protocol is established by considering a closely related dual optimization problem. The game-theoretic technical difficulties that we solve in this paper are very general and encountered whenever proving the optimality of a randomized algorithm in parallel and distributed computation.

  1. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Ravn, Anders P.

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact ...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way.......Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...

  2. Materials Test Station

    Data.gov (United States)

    Federal Laboratory Consortium — When completed, the Materials Test Station at the Los Alamos Neutron Science Center will meet mission need. MTS will provide the only fast-reactor-like irradiation...

  3. MCFRS Incidents by Station

    Data.gov (United States)

    Montgomery County of Maryland — This dataset contains the monthly summary data indicating incident occurred in each fire station response area. The summary data is the incident count broken down by...

  4. FEMA DFIRM Station Start

    Data.gov (United States)

    Minnesota Department of Natural Resources — This table contains information about station starting locations. These locations indicate the reference point that was used as the origin for distance measurements...

  5. "Central Station" Londonis

    Index Scriptorium Estoniae

    2000-01-01

    Londoni galeriis Milch seitsme läti, leedu ja eesti kunstniku projekt "Central Station". Kuraatorid Lisa Panting, Sally Tallant. Eestist osalevad Hanno Soans (Catarina Campinoga koostöös valminud video), Kiwa, Kai Kaljo

  6. Mukilteo Research Station

    Data.gov (United States)

    Federal Laboratory Consortium — Research at the Mukilteo Research Station focuses on understanding the life cycle of marine species and the impacts of ecosystem stressors on anadromous and marine...

  7. Routes and Stations

    Data.gov (United States)

    Department of Homeland Security — he Routes_Stations table is composed of fixed rail transit systems within the Continental United States, Alaska, Hawaii, the District of Columbia, and Puerto Rico....

  8. Public Transit Stations

    Data.gov (United States)

    Department of Homeland Security — fixed rail transit stations within the Continental United States, Alaska, Hawaii, the District of Columbia, and Puerto Rico. The modes of transit that are serviced...

  9. Electrostatic pickup station

    CERN Multimedia

    CERN PhotoLab

    1982-01-01

    Electrostatic pickup station, with 4 interleaved electrodes, to measure beam position in the horizontal and vertical plane. This type is used in the transfer lines leaving the PS (TT2, TT70, TTL2). See also 7904075.

  10. Capacity at Railway Stations

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    zone(s) the possible conflicts with other trains (also in the opposite direction) are taken into account leading to more trustworthy results. Although the UIC 406 methodology proposes that the railway network should be divided into line sections when trains turn around and when the train order...... is changed, this paper recommends that the railway lines are not always be divided. In case trains turn around on open (single track) line, the capacity consumption may be too low if a railway line is divided. The same can be the case if only few trains are overtaken at an overtaking station. For dead end......Stations do have other challenges regarding capacity than open lines as it is here the traffic is dispatched. The UIC 406 capacity method that can be used to analyse the capacity consumption can be exposed in different ways at stations which may lead to different results. Therefore, stations need...

  11. Master Station History Report

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Standard/Legacy MSHR, formally identified as the DSI-9767 dataset, is the legacy dataset/report sorted by NCDC Station ID and period of record. This...

  12. ASOS Station Photos

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The images contained in this library are of stations in the Automated Surface Observing System (ASOS) network. These images were taken between 1998-2001 for the ASOS...

  13. Natural Weathering Exposure Station

    Data.gov (United States)

    Federal Laboratory Consortium — The Corps of Engineers' Treat Island Natural Weathering Exposure Station is a long-term natural weathering facility used to study concrete durability. Located on the...

  14. Multiple Craft Stations.

    Science.gov (United States)

    Johns, Mary Sue

    1980-01-01

    Described are three craft stations (claywork, papermaking, and stamp designing) for intermediate grade students, to correlate with their classroom study which focused on Ohio: its history, geography, cities, industries, products and famous natives. (KC)

  15. Signal Station Inspection Reports

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Handwritten reports resulting from detailed inspections of US Army Signal Service Stations, 1871-1889. Features reported included instrument exposure and condition,...

  16. Maine Field Station

    Data.gov (United States)

    Federal Laboratory Consortium — In 2000 NOAA's National Marine Fisheries Service established the Maine Field Station in Orono, ME to have more direct involvement in the conservation of the living...

  17. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  18. TIME RESERVES DURING THE ORGANISATION OF FREIGHT TRAIN MOVEMENT ON SCHEDULE

    Directory of Open Access Journals (Sweden)

    D. M. Kozachenko

    2015-03-01

    Full Text Available Purpose. The article is devoted to the development of estimation methods of time reserves that should be formed at the train schedule and the schedule for the turnover of freight trains, required to ensure the sustained interaction of technological processes of industrial enterprises and railways for the transportation of freight on schedule. Methodology. The paper considers the issues of bulk conveyance organization between industrial enterprises on schedule. In order to ensure the arrival of trains at the destination station to the specified time, the schedules of rolling stocks turnover must have some time reserves. These reserves, in their turn, should be sufficient for correction action of destabilizing factors. The methods of mathematical statistics were used to study the schedule performance quality of separate trains. Currently the movement of the main part of freight trains is performed on preparedness and occupation processes of separate schedule train paths by some depots are not fixed. Therefore, the analyses of the schedule performance of freight trains do not allow receiving the material for research. And, due to the lack of statistical material on the punctuality of the schedule for the movement of freight trains, research of the passenger trains movement with subsequent dissemination of results on freight movement were carried out by the authors. Findings. The research proved that the trains arrival at the destination station according to the schedule should be ensured by permissible rating of delay as well as increase the operating time of trains and running intervals. The values of the additional time reserves that should be included in the schedule of trains, and the schedule for the turnover of freight trains to provide conditional interaction of railroads and industrial enterprises in Ukraine were proposed. Originality. On the basis of the research development graph methods of trains turnover, providing transportation of

  19. Space Station galley design

    Science.gov (United States)

    Trabanino, Rudy; Murphy, George L.; Yakut, M. M.

    1986-01-01

    An Advanced Food Hardware System galley for the initial operating capability (IOC) Space Station is discussed. Space Station will employ food hardware items that have never been flown in space, such as a dishwasher, microwave oven, blender/mixer, bulk food and beverage dispensers, automated food inventory management, a trash compactor, and an advanced technology refrigerator/freezer. These new technologies and designs are described and the trades, design, development, and testing associated with each are summarized.

  20. National Seismic Station

    International Nuclear Information System (INIS)

    Stokes, P.A.

    1982-06-01

    The National Seismic Station was developed to meet the needs of regional or worldwide seismic monitoring of underground nuclear explosions to verify compliance with a nuclear test ban treaty. The Station acquires broadband seismic data and transmits it via satellite to a data center. It is capable of unattended operation for periods of at least a year, and will detect any tampering that could result in the transmission of unauthentic seismic data

  1. 1100 MW BWR power station

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Now, the start-up test of No. 2 plant in Fukushima No. 2 Nuclear Power Station is smoothly in progress, and the start of its commercial operation is scheduled at the beginning of 1984. Here, the main features of No. 2 plant including piping design are explained. For No. 2 plant, many improving measures were adopted as the base plant of the improvement and standardization project of the Ministry of International Trade and Industry, such as the adoption of Mark-2 improved PCV, the adoption of an intermediate loop in the auxiliary cooling system, one-body forging of the lower end cover of the reactor pressure vessel, the adoption of many curved pipes, the adoption of large one-body structural components in reactor recirculation system piping and so on, which are related to the reduction of radiation exposure and the improvement of plant reliability in operation and regular inspection. Also, in order to do general adjustment in the arrangement of equipment and piping and in route design, and to establish the rational construction work plan, model engineering was adopted. In No. 2 plant, a remote-controlled automatic and semiautomatic ultrasonic flaw detection system was adopted to reduce radiation exposure in in-service inspection. Automatic welding was adopted to improve the quality. (Kako, I.)

  2. Gas Stations, US, 2010, NAVTEQ

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Gas_Stations dataset is derived from the Navteq 'AUTOSVC' SDC layer (FAC_TYPE=5540) and contains gas stations and petrol stations. This NAVTEQ dataset is...

  3. Enhanced Master Station History Report

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Enhanced Master Station History Report (EMSHR) is a compiled list of basic, historical information for every station in the station history database, beginning...

  4. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  5. Approach to transaction management for Space Station Freedom

    Science.gov (United States)

    Easton, C. R.; Cressy, Phil; Ohnesorge, T. E.; Hector, Garland

    1990-01-01

    The Space Station Freedom Manned Base (SSFMB) will support the operation of the many payloads that may be located within the pressurized modules or on external attachment points. The transaction management (TM) approach presented provides a set of overlapping features that will assure the effective and safe operation of the SSFMB and provide a schedule that makes potentially hazardous operations safe, allocates resources within the capability of the resource providers, and maintains an environment conducive to the operations planned. This approach provides for targets of opportunity and schedule adjustments that give the operators the flexibility to conduct a vast majority of their operations with no conscious involvement with the TM function.

  6. Scheduling at the Los Alamos Neutron Science Center (LANSCE)

    International Nuclear Information System (INIS)

    Gallegos, F.R.

    1999-01-01

    The centerpieces of the Los Alamos Neutron Science Center (LANSCE) are a half-mile long 800-MeV proton linear accelerator and proton storage ring. The accelerator, storage ring, and target stations provide the protons and spallation neutrons that are used in the numerous basic research and applications experimental programs supported by the US Department of Energy. Experimental users, facility maintenance personnel, and operations personnel must work together to achieve the most program benefit within defined budget and resource constraints. In order to satisfy the experimental users programs, operations must provide reliable and high quality beam delivery. Effective and efficient scheduling is a critical component to achieve this goal. This paper will detail how operations scheduling is presently executed at the LANSCE accelerator facility

  7. Scheduling at the Los Alamos Neutron Science Center (LANSCE)

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, F.R.

    1999-02-01

    The centerpieces of the Los Alamos Neutron Science Center (LANSCE) are a half-mile long 800-MeV proton linear accelerator and proton storage ring. The accelerator, storage ring, and target stations provide the protons and spallation neutrons that are used in the numerous basic research and applications experimental programs supported by the US Department of Energy. Experimental users, facility maintenance personnel, and operations personnel must work together to achieve the most program benefit within defined budget and resource constraints. In order to satisfy the experimental users programs, operations must provide reliable and high quality beam delivery. Effective and efficient scheduling is a critical component to achieve this goal. This paper will detail how operations scheduling is presently executed at the LANSCE accelerator facility.

  8. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    Dynamic models of congestion so far rely on exogenous scheduling preferences of travelers, based for example on disutility of deviation from a preferred departure or arrival time for a trip. This paper provides a more fundamental view in which travelers derive utility just from consumption and le...

  9. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  10. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1996-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the US Department of Energy (DOE). This document contains the planned 1996 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project

  11. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  12. Course Scheduling and Academic Performance

    Science.gov (United States)

    Dills, Angela K.; Hernandez-Julian, Rey

    2008-01-01

    This paper examines the relationship between course scheduling and student achievement, controlling for student and course characteristics. The literature in psychology recognizes that performance varies by time of day and that spacing learning out over time may foster greater long-term memory of items. We use student grades as a measure of…

  13. Job scheduling, cooperation and control

    NARCIS (Netherlands)

    Calleja, P.; Estevez Fernandez, M.A.; Borm, P.; Hamers, H.

    2006-01-01

    This paper studies one machine job scheduling situations where clients can have more than one job to be processed and where a job can be of interest for different players. Corresponding cooperative games are introduced and a result on balancedness is provided. © 2005 Elsevier B.V. All rights

  14. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different...

  15. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  16. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  17. A Management Tool for Improvement (Improving) IMS Stations Performance

    International Nuclear Information System (INIS)

    Mohammad, D.; Pantin, A.; Quintana, E.

    2011-01-01

    IMS-Maintenance is a software under development by the personnel of ARN-CTBT office, intended for the technical management of IMS stations under ARN's responsibility. This software integrates the whole control of the equipment in an IMS station, including the management of consumables used in daily or periodic operation. It permits an easy retrieval (access) of the technical features, suppliers, etc. of each item of the equipment, as well as its maintenance history and scheduled task. Although this project is still in a starting phase, a preliminary version of this software is being used in radionuclide station RN01 (Buenos Aires), having already demonstrated its usefulness and potential for the improvement of IMS station management. (authors)

  18. Optimization of Temperature Schedule Parameters on Heat Supply in Power-and-Heat Supply Systems

    Directory of Open Access Journals (Sweden)

    V. A. Sednin

    2009-01-01

    Full Text Available The paper considers problems concerning optimization of a temperature schedule in the district heating systems with steam-turbine thermal power stations having average initial steam parameters. It has been shown in the paper that upkeeping of an optimum network water temperature permits to increase an energy efficiency of heat supply due to additional systematic saving of fuel. 

  19. ILRS Station Reporting

    Science.gov (United States)

    Noll, Carey E.; Pearlman, Michael Reisman; Torrence, Mark H.

    2013-01-01

    Network stations provided system configuration documentation upon joining the ILRS. This information, found in the various site and system log files available on the ILRS website, is essential to the ILRS analysis centers, combination centers, and general user community. Therefore, it is imperative that the station personnel inform the ILRS community in a timely fashion when changes to the system occur. This poster provides some information about the various documentation that must be maintained. The ILRS network consists of over fifty global sites actively ranging to over sixty satellites as well as five lunar reflectors. Information about these stations are available on the ILRS website (http://ilrs.gsfc.nasa.gov/network/stations/index.html). The ILRS Analysis Centers must have current information about the stations and their system configuration in order to use their data in generation of derived products. However, not all information available on the ILRS website is as up-to-date as necessary for correct analysis of their data.

  20. Evaluation of a Cross Layer Scheduling Algorithm for LTE Downlink

    Directory of Open Access Journals (Sweden)

    A. Popovska Avramova

    2013-06-01

    Full Text Available The LTE standard is a leading standard in the wireless broadband market. The Radio Resource Management at the base station plays a major role in satisfying users demand for high data rates and quality of service. This paper evaluates a cross layer scheduling algorithm that aims at minimizing the resource utilization. The algorithm makes decisions based on channel conditions, the size of transmission buffers and different quality of service demands. Simulation results show that the new algorithm improves the resource utilization and provides better guarantees for service quality.

  1. Integrated scheduling of tasks and gynecologists to improve patient appointment scheduling : a case study

    NARCIS (Netherlands)

    van de Vrugt, Maartje; Luen-English, Samuel J.; Bastiaansen, W.A.P.; Kleinluchtenbeld, S.; Lardinois, W.T.P.; Pots, M.H.; Schoonbergen, D.H.; Hans, Erwin W.; Hurink, Johann L.; Boucherie, Richardus J.

    Like many hospital departments, the gynecology department of the Jeroen Bosch Hospital experienced difficulties with scheduling outpatient appointments at the medically preferred times. Despite the time invested in creating the schedule, the compliance of the achieved schedules with the preferences

  2. Telephony Earth Station

    Science.gov (United States)

    Morris, Adrian J.; Kay, Stan

    The Telephony Earth Station (TES), a digital full-mesh SCPC (single channel per carrier) system designed for satellite voice and data transmission is described. As compared to companded FM, the advanced speech compression and forward error correction techniques used by TES better achieve the quality, power, and bandwidth ideal for each application. In addition, the TES offers a fully demand-assigned voice call setup, handles point-to-point data channels, supports a variety of signaling schemes, and does not require any separate pilot receivers at the station, while keeping costs low through innovative technology and packaging. The TES can be used for both C-band and Ku-band (domestic or international) applications, and is configurable either as an VSAT (very small aperture terminal) using an SSPA, or as a larger station depending on the capacity requirements. A centralized DAMA processor and network manager is implemented using a workstation.

  3. Waste Transfer Stations

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund

    2011-01-01

    tion and transport is usually the most costly part of any waste management system; and when waste is transported over a considerable distance or for a long time, transferring the waste from the collection vehicles to more efficient transportation may be economically beneficial. This involves...... a transfer station where the transfer takes place. These stations may also be accessible by private people, offering flexibility to the waste system, including facilities for bulky waste, household hazardous waste and recyclables. Waste transfer may also take place on the collection route from small...... satellite collection vehicles to large compacting vehicles that cannot effectively travel small streets and alleys within the inner city or in residential communities with narrow roads. However, mobile transfer is not dealt with in this chapter, which focuses on stationary transfer stations. This chapter...

  4. Hydrogen vehicle fueling station

    Energy Technology Data Exchange (ETDEWEB)

    Daney, D.E.; Edeskuty, F.J.; Daugherty, M.A. [Los Alamos National Lab., NM (United States)] [and others

    1995-09-01

    Hydrogen fueling stations are an essential element in the practical application of hydrogen as a vehicle fuel, and a number of issues such as safety, efficiency, design, and operating procedures can only be accurately addressed by a practical demonstration. Regardless of whether the vehicle is powered by an internal combustion engine or fuel cell, or whether the vehicle has a liquid or gaseous fuel tank, the fueling station is a critical technology which is the link between the local storage facility and the vehicle. Because most merchant hydrogen delivered in the US today (and in the near future) is in liquid form due to the overall economics of production and delivery, we believe a practical refueling station should be designed to receive liquid. Systems studies confirm this assumption for stations fueling up to about 300 vehicles. Our fueling station, aimed at refueling fleet vehicles, will receive hydrogen as a liquid and dispense it as either liquid, high pressure gas, or low pressure gas. Thus, it can refuel any of the three types of tanks proposed for hydrogen-powered vehicles -- liquid, gaseous, or hydride. The paper discusses the fueling station design. Results of a numerical model of liquid hydrogen vehicle tank filling, with emphasis on no vent filling, are presented to illustrate the usefulness of the model as a design tool. Results of our vehicle performance model illustrate our thesis that it is too early to judge what the preferred method of on-board vehicle fuel storage will be in practice -- thus our decision to accommodate all three methods.

  5. OMS event evaluator and scheduler

    Science.gov (United States)

    Eckelkamp, Richard E.

    1990-01-01

    An Operations Management System (OMS) is being designed for Space Station Freedom to improve productivity, reliability, and safety while reducing operations and maintenance costs. Central to the concept is a short term plan containing mixes of man-readable and machine-executable procedures used in an environment of distributed processing and execution. An OMS event evaluator to check upcoming short-term plan events for validity of execution is under development. The first version checks time and resource constraints against operational conditions for current or expected stations. In work are the handling of environmental and other operational constraints, as well as detailed modeling of resources and station operational states. The Ada Program also has the ability to reschedule all or part of the events.

  6. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  7. Requested meals versus scheduled meals

    Directory of Open Access Journals (Sweden)

    Ciampolini M

    2012-04-01

    Full Text Available Mario CiampoliniPreventive Gastroenterology Unit, Department of Paediatrics, Università di Firenze, Florence, ItalyBackground: Scheduled meals are considered to be equivalent to those requested by the infant (null hypothesis. In adults, we have found high blood glucose before scheduled meals and low blood glucose after recognition of validated initial hunger. Low preprandial blood glucose is associated with a decrease in energy intake and body weight both in adults who are overtly overweight and in those who are of normal weight with insulin resistance (hidden overweight. In this study, we investigated the validity of the null hypothesis between scheduled and requested meals in 2-year-old infants with chronic nonspecific diarrhea.Methods: We trained a "recognizing request" meal pattern in 70 mother-infant pairs. The trained meal pattern consisted of administering food after a first request that we validated by blood glucose measurement in the hospital laboratory. Using a 7-day food diary, mothers reported preprandial blood glucose measurements for their infants three times a day. We assessed mean preprandial blood glucose, daily energy intake, days with diarrhea, blood parameters, and anthropometry before training and 4 months after training, and compared the results with measurements in 73 randomly selected untrained controls.Results: In the trained group, there was a decrease in mean blood glucose from 86.9 ± 9.4 mg/dL to 76.4 ± 6.7 mg/dL (P < 0.0001, as well as a decrease in energy intake and days with diarrhea in comparison with control infants who maintained scheduled meals. Only two of 21 infants who had a mean blood glucose lower than 81.2 mg/dL at recruitment showed a statistically significant decrease in mean blood glucose, whereas 36 of 49 infants above this cutoff level showed a statistically significant decrease after training (Chi-square test, P < 0.0001.Conclusion: Requested meals are associated with low preprandial blood

  8. Space Station cupola definition

    Science.gov (United States)

    Weaver, Laurie A.

    1988-01-01

    The concept of a Space Station cupola has evolved from a small bubble-type viewport into the primary location for proximity operations requiring direct unobstructed viewing. Derived from a viewing analysis conducted by the Man-Systems Division at the Johnson Space Center, the cupola represents a solution for out-of-plane viewing which cannot be provided by windows placed in the shell of the habitation and/or laboratory modules. An extended Man-Systems design study resulted in several cupola configurations, each illustrating an alternate solution to the required balance between viewing, projected Space Station operations, and human/machine interface issues.

  9. Space Station Biological Research Project

    Science.gov (United States)

    Johnson, Catherine C.; Hargens, Alan R.; Wade, Charles E.

    1995-01-01

    NASA Ames Research Center is responsible for the development of the Space Station Biological Research Project (SSBRP) which will support non-human life sciences research on the International Space Station Alpha (ISSA). The SSBRP is designed to support both basic research to understand the effect of altered gravity fields on biological systems and applied research to investigate the effects of space flight on biological systems. The SSBRP will provide the necessary habitats to support avian and reptile eggs, cells and tissues, plants and rodents. In addition a habitat to support aquatic specimens will be provided by our international partners. Habitats will be mounted in ISSA compatible racks at u-g and will also be mounted on a 2.5 m diameter centrifuge except for the egg incubator which has an internal centrifuge. The 2.5 m centrifuge will provide artificial gravity levels over the range of 0.01 G to 2 G. The current schedule is to launch the first rack in 1999, the Life Sciences glovebox and a second rack early in 2001, a 4 habitat 2.5 in centrifuge later the same year in its own module, and to upgrade the centrifuge to 8 habitats in 2004. The rodent habitats will be derived from the Advanced Animal Habitat currently under development for the Shuttle program and will be capable of housing either rats or mice individually or in groups (6 rats/group and at least 12 mice/group). The egg incubator will be an upgraded Avian Development Facility also developed for the Shuttle program through a Small Business and Innovative Research grant. The Space Tissue Loss cell culture apparatus, developed by Walter Reed Army Institute of Research, is being considered for the cell and tissue culture habitat. The Life Sciences Glovebox is crucial to all life sciences experiments for specimen manipulation and performance of science procedures. It will provide two levels of containment between the work volume and the crew through the use of seals and negative pressure. The glovebox

  10. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  11. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    through, for example, Program Evaluation and Review Technique, Critical Path Method and Gantt Charts (Blanchard & Fabrycky, 2006, esp. Chap. 11...million lines in the F-15E. Lines of code in the F-35 vary with source and date. A 2014 CRS report estimates F- 35 software as containing...set of tasks (e.g., PERT, Gantt Charts) 4 SCHEDULE EST. RELATIONSHIPS Some Candidate Explanatory Variables • Risk Reduction Efforts • Contract

  12. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  13. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  14. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  15. Advisory Committee on the Redesign of the Space Station

    Science.gov (United States)

    1993-06-01

    The Space Station Program was initiated in 1984 to provide for permanent human presence in an orbiting laboratory. This program evolved into Space Station Freedom, later identified as a component to facilitate a return of astronauts to the Moon, followed by the exploration of Mars. In March 1993 the Clinton Administration directed NASA to undertake an intense effort to redesign the space station at a substantial cost savings relative to Space Station Freedom. The Advisory Committee on the Redesign of the Space Station was established in March 1993 to provide independent assessment of the advantages and disadvantages of the redesign options. The results of the Committee's work is described. Discussion describes the mission that the Administration has articulated for the Space Station Program and the scientific and technical characteristics that a redesigned station must possess to fulfill those objectives. A description of recommended management, operations, and acquisition strategies for the redesigned program is provided. The Committee's assessment of the redesign options against five criteria are presented. The five criteria are technical capabilities, research capabilities, schedule, cost, and risk. A discussion of general mission risk is included.

  16. Ada and cyclic runtime scheduling

    Science.gov (United States)

    Hood, Philip E.

    1986-01-01

    An important issue that must be faced while introducing Ada into the real time world is efficient and prodictable runtime behavior. One of the most effective methods employed during the traditional design of a real time system is the cyclic executive. The role cyclic scheduling might play in an Ada application in terms of currently available implementations and in terms of implementations that might be developed especially to support real time system development is examined. The cyclic executive solves many of the problems faced by real time designers, resulting in a system for which it is relatively easy to achieve approporiate timing behavior. Unfortunately a cyclic executive carries with it a very high maintenance penalty over the lifetime of the software that is schedules. Additionally, these cyclic systems tend to be quite fragil when any aspect of the system changes. The findings are presented of an ongoing SofTech investigation into Ada methods for real time system development. The topics covered include a description of the costs involved in using cyclic schedulers, the sources of these costs, and measures for future systems to avoid these costs without giving up the runtime performance of a cyclic system.

  17. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the decontamination of plant components and structures at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities in support of the shipment of radioactive wastes and the unconditional release of the site and structural materials. 1 ref., 16 figs., 4 tabs

  18. Designing a Weather Station

    Science.gov (United States)

    Roman, Harry T.

    2012-01-01

    The collection and analysis of weather data is crucial to the location of alternate energy systems like solar and wind. This article presents a design challenge that gives students a chance to design a weather station to collect data in advance of a large wind turbine installation. Data analysis is a crucial part of any science or engineering…

  19. Hydrogen Fuelling Stations

    DEFF Research Database (Denmark)

    Rothuizen, Erasmus Damgaard

    station has been developed in Dymola. The models include the fuelling protocol (J2601) for hydrogen vehicles made by Society of Automotive Engineers (SAE) and the thermodynamic property library CoolProp is used for retrieving state point. The components in the hydrogen fuelling library are building up...

  20. Avoiding Service Station Fraud.

    Science.gov (United States)

    Burton, Grace M.; Burton, John R.

    1982-01-01

    High school students are warned against service station fraud. A problem-solving section is designed to help students calculate consumer costs for various fraudulent transactions. Several ways of reducing fraud or of lessening the chances of problems are noted. (MP)

  1. The Service Station.

    Science.gov (United States)

    Ohio State Univ., Columbus. Center for Vocational and Technical Education.

    The purpose of the teacher's guide is to encourage the primary student to expand his or her awareness of jobs within the community. The role of the service station worker is examined, with emphasis on the goods and services provided. Subject areas for which the materials in this guide have potential are social studies, art, and language. Each set…

  2. Electrostatic pickup station

    CERN Multimedia

    CERN PhotoLab

    1979-01-01

    Electrostatic pickup station, with 4 electrodes, to measure beam position in the horizontal and vertical plane. This type is used in the transfer lines leaving the PS (TT2, TTL2, TT70). See also 8206063, where the electrode shapes are clearly visible.

  3. Space Station Water Quality

    Science.gov (United States)

    Willis, Charles E. (Editor)

    1987-01-01

    The manned Space Station will exist as an isolated system for periods of up to 90 days. During this period, safe drinking water and breathable air must be provided for an eight member crew. Because of the large mass involved, it is not practical to consider supplying the Space Station with water from Earth. Therefore, it is necessary to depend upon recycled water to meet both the human and nonhuman water needs on the station. Sources of water that will be recycled include hygiene water, urine, and cabin humidity condensate. A certain amount of fresh water can be produced by CO2 reduction process. Additional fresh water will be introduced into the total pool by way of food, because of the free water contained in food and the water liberated by metabolic oxidation of the food. A panel of scientists and engineers with extensive experience in the various aspects of wastewater reuse was assembled for a 2 day workshop at NASA-Johnson. The panel included individuals with expertise in toxicology, chemistry, microbiology, and sanitary engineering. A review of Space Station water reclamation systems was provided.

  4. International Space Station Assembly

    Science.gov (United States)

    1999-01-01

    The International Space Station (ISS) is an unparalleled international scientific and technological cooperative venture that will usher in a new era of human space exploration and research and provide benefits to people on Earth. On-Orbit assembly began on November 20, 1998, with the launch of the first ISS component, Zarya, on a Russian Proton rocket. The Space Shuttle followed on December 4, 1998, carrying the U.S.-built Unity cornecting Module. Sixteen nations are participating in the ISS program: the United States, Canada, Japan, Russia, Brazil, Belgium, Denmark, France, Germany, Italy, the Netherlands, Norway, Spain, Sweden, Switzerland, and the United Kingdom. The ISS will include six laboratories and be four times larger and more capable than any previous space station. The United States provides two laboratories (United States Laboratory and Centrifuge Accommodation Module) and a habitation module. There will be two Russian research modules, one Japanese laboratory, referred to as the Japanese Experiment Module (JEM), and one European Space Agency (ESA) laboratory called the Columbus Orbital Facility (COF). The station's internal volume will be roughly equivalent to the passenger cabin volume of two 747 jets. Over five years, a total of more than 40 space flights by at least three different vehicles - the Space Shuttle, the Russian Proton Rocket, and the Russian Soyuz rocket - will bring together more than 100 different station components and the ISS crew. Astronauts will perform many spacewalks and use new robotics and other technologies to assemble ISS components in space.

  5. Space Station Energy Sizing

    Science.gov (United States)

    Rice, R. R.

    1983-01-01

    A general schematic for a space station power system is described. The major items of interest in the power system are the solar array, transfer devices, energy storage, and conversion equipment. Each item will have losses associated with it and must be utilized in any sizing study, and can be used as a checklist for itemizing the various system components.

  6. Issues in Locomotive Crew Management and Scheduling

    Science.gov (United States)

    1990-11-01

    This study explores matters related to the scheduling and management of locomotive crews, particularly as they : might contribute to fatigue and stress. It describes how crews are scheduled currently, why there is so much : unpredictability in schedu...

  7. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  8. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  9. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  10. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  11. Temperature Discontinuity Caused by Relocation of Meteorological Stations in Taiwan

    Directory of Open Access Journals (Sweden)

    Chih-wen Hung

    2009-01-01

    Full Text Available With global warming upon us, it has be come increasingly important to identify the extent of this warming trend and in doing so be able to rank mean temperature changes in particular seasons and years. This requires a need for homogeneous climate data, which do not reflect individual anomalies in instruments, station locations or local environments (urbanization. Ac curate homogeneous long-term meteorological data helps show how temperature variations have truly occurred in the climate. Many possible factors contribute to artificial abrupt changes or sharp discontinuities in long time series data, such as the impact of station relocation, changes in observational schedules and instrumentation. Homogeneity adjustments of in situ climate data are very important processes for preparing observational data to be used in further analysis and research. Users require a well-documented history of stations to make appropriate homogeneity adjustments because precise historical back ground records of stations can provide researchers with knowledge of when artificial discontinuity has occurred and its causes. With out such de tailed historical data for each meteorological station, abrupt changes are difficult to interpret. Unfortunately, no homogeneity adjustments for temperature records have been con ducted previously in Tai wan, and present available sources of the history of Taiwan's meteorological stations exhibit in consistencies. In this study, information pertaining to station history, especially relocation records, is pro vided. This information is essential for anal y sis of continuous time series data for temperature and climate warming studies. Temperature data from several stations is given in this study to show how artificial discontinuity occurs due to station relocation. Al though there is no homogeneous adjusted climate data provided in this preliminary work, the summarizing of information regarding station relocations should be of assistance

  12. Agile Systems Engineering-Kanban Scheduling Subsection

    Science.gov (United States)

    2017-03-10

    Agile Systems Engineering – Kanban Scheduling Subsection Technical Report SERC-2017-TR-104 March 10, 2017 Principal Investigator: Dr...scheduling systems based on explicit, transparent, and continuously updated value of work [6], [7], [8]. This Kanban -based Scheduling System Network (KSSN...and literature searches. • RT-35/35A, Agile-Lean Software Engineering (ALSE) Evaluating Kanban in SE, focused on using pull scheduling techniques

  13. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  14. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  15. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  16. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  17. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  18. 7 CFR 283.29 - Scheduling conference.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Scheduling conference. 283.29 Section 283.29... Procedure for Appeals of QC Claims of Less Than $50,000 § 283.29 Scheduling conference. (a) Time and place. The ALJ shall direct the parties or their counsel to attend a scheduling conference following the...

  19. Hydrogen Filling Station

    Energy Technology Data Exchange (ETDEWEB)

    Boehm, Robert F; Sabacky, Bruce; Anderson II, Everett B; Haberman, David; Al-Hassin, Mowafak; He, Xiaoming; Morriseau, Brian

    2010-02-24

    Hydrogen is an environmentally attractive transportation fuel that has the potential to displace fossil fuels. The Freedom CAR and Freedom FUEL initiatives emphasize the importance of hydrogen as a future transportation fuel. Presently, Las Vegas has one hydrogen fueling station powered by natural gas. However, the use of traditional sources of energy to produce hydrogen does not maximize the benefit. The hydrogen fueling station developed under this grant used electrolysis units and solar energy to produce hydrogen fuel. Water and electricity are furnished to the unit and the output is hydrogen and oxygen. Three vehicles were converted to utilize the hydrogen produced at the station. The vehicles were all equipped with different types of technologies. The vehicles were used in the day-to-day operation of the Las Vegas Valley Water District and monitoring was performed on efficiency, reliability and maintenance requirements. The research and demonstration utilized for the reconfiguration of these vehicles could lead to new technologies in vehicle development that could make hydrogen-fueled vehicles more cost effective, economical, efficient and more widely used. In order to advance the development of a hydrogen future in Southern Nevada, project partners recognized a need to bring various entities involved in hydrogen development and deployment together as a means of sharing knowledge and eliminating duplication of efforts. A road-mapping session was held in Las Vegas in June 2006. The Nevada State Energy Office, representatives from DOE, DOE contractors and LANL, NETL, NREL were present. Leadership from the National hydrogen Association Board of Directors also attended. As a result of this session, a roadmap for hydrogen development was created. This roadmap has the ability to become a tool for use by other road-mapping efforts in the hydrogen community. It could also become a standard template for other states or even countries to approach planning for a hydrogen

  20. Mobile environmental radiation monitoring station

    International Nuclear Information System (INIS)

    Assido, H.; Shemesh, Y.; Mazor, T.; Tal, N.; Barak, D.

    1997-01-01

    A mobile environmental radiation monitoring station has been developed and established for the Israeli Ministry of Environment. The radiation monitoring station is ready for immediate placing in any required location, or can be operated from a vehicle. The station collects data Tom the detector and transfers it via cellular communication network to a Computerized Control Center for data storage, processing, and display . The mobile station is fully controlled from the. Routinely, the mobile station responses to the data request accumulated since the last communication session. In case of fault or alarm condition in the mobile station, a local claim is activated and immediately initiates communication with the via cellular communication network. (authors)

  1. Robotic dissolution station

    Energy Technology Data Exchange (ETDEWEB)

    Beugelsdijk, T.J.; Hollen, R.M.; Temer, D.J.; Haggart, R.J.; Erkkila, T.H.

    1991-12-31

    This invention is comprised of a robotic station for dissolving active metals in acid in an automated fashion. A vessel with cap, containing the active metal is placed onto a shuttle which retracts to a point at which it is directly beneath a cap removing and retaining mechanism. After the cap is removed, a tube carrying an appropriate acid is inserted into the vessel, and the acid is introduced. The structure of the station forms an open hood which is swept of gases generated by the dissolution and the air removed to a remote location for scrubbing. After the reaction is complete, the shuttle extends and the vessel may be removed by a robot arm.

  2. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  3. Optimization of Multiperiod Mixed Train Schedule on High-Speed Railway

    Directory of Open Access Journals (Sweden)

    Wenliang Zhou

    2015-01-01

    Full Text Available For providing passengers with periodic operation trains and making trains’ time distribution better fit that of passengers, the multiperiod mixed train schedule is first proposed in this paper. It makes each type of train having same origin, destination, route, and stop stations operate based on a periodic basis and allows different types of train to have various operation periods. Then a model of optimizing multiperiod mixed train schedule is built to minimize passengers generalized travel costs with the constraints of trains of same type operating periodically, safe interval requirements of trains’ departure, and arrival times, and so forth. And its heuristic algorithm is designed to optimize the multiperiod mixed train schedule beginning with generating an initial solution by scheduling all types of train type by type and then repeatedly improving their periodic schedules until the objective value cannot be reduced or the iteration number reaches its maximum. Finally, example results illustrate that the proposed model and algorithm can effectively gain a better multiperiod mixed train schedule. However, its passengers deferred times and advanced times are a little higher than these of an aperiodic train schedule.

  4. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    Science.gov (United States)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  5. An EV Charging Scheduling Mechanism Based on Price Negotiation

    Directory of Open Access Journals (Sweden)

    Baocheng Wang

    2018-05-01

    Full Text Available Scheduling EV user’s charging behavior based on charging price and applying renewable energy resources are the effective methods to release the load pressure of power grids brought about by the large-scale popularity of electric vehicles (EVs. This paper presents a novel approach for EV charging scheduling based on price negotiation. Firstly, the EV charging system framework based on price negotiation and renewable energy resources is discussed. Secondly, the price negotiation model is presented, including the initial price models and the conditions of transactions. Finally, an EV charging scheduling mechanism based on price negotiation (CSM-PN, including the price adjustment strategies of both the operator and EV users is proposed to seek a final transaction during multi-round price negotiation. Simulation results show that this novel approach can effectively improve the charging station operator’s income, reduce the EV users’ costs, and balance the load of the power grid while improving the efficiency of the EV charging system.

  6. Shippingport station communications program

    International Nuclear Information System (INIS)

    Stote, J.J.

    1988-01-01

    The author discusses how the communications program for the Shippingport Atomic Power Station has a long history. It can be traced as far back as 1953, when the U.S. Atomic Energy Commission (AEC) awarded a contract to Westinghouse Electric to design the nuclear portion of a power plant for electric utility use. During May of the next year, President Eisenhower initiated groundbreaking ceremonies for the construction of the commercial atomic power plant at Shippingport, Pennsylvania

  7. The nuclear power station

    International Nuclear Information System (INIS)

    Plettner, B.

    1987-04-01

    The processes taking place in a nuclear power plant and the dangers arising from a nuclear power station are described. The means and methods of controlling, monitoring, and protecting the plant and things that can go wrong are presented. There is also a short discourse on the research carried out in the USA and Germany, aimed at assessing the risks of utilising nuclear energy by means of the incident tree analysis and probability calculations. (DG) [de

  8. Summit Station Skiway Review

    Science.gov (United States)

    2013-03-01

    determine its usefulness for enhancing runway performance. We docu- mented the snow strength with a Rammsonde Cone Penetrometer and de- termined the... Penetrometer and delivered it to Summit during the Phase III turnover in February 2011 so that it would be available for testing during spring skiway...discussed current maintenance practices with the Station Manager, trained staff on proper use of the Rammsonde Cone Penetrometer , inspected current

  9. Work continues on Destiny, the U.S. Lab module, in the Space Station Processing Facility

    Science.gov (United States)

    1999-01-01

    In the Space Station Processing Facility (SSPF), work continues on the U.S. Lab module, Destiny, which is scheduled to be launched on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the International Space Station. Destiny shares space in the SSPF with the Shuttle Radar Topography Mission (SRTM) and Leonardo, the Multipurpose Logistics Module (MPLM) built by the Agenzia Spaziale Italiana (ASI). The SRTM is targeted for launch on mission STS-99 in September 1999. Leonardo is scheduled to launch on mission STS- 102 in June 2000.

  10. Embedded multiprocessors scheduling and synchronization

    CERN Document Server

    Sriram, Sundararajan

    2009-01-01

    Techniques for Optimizing Multiprocessor Implementations of Signal Processing ApplicationsAn indispensable component of the information age, signal processing is embedded in a variety of consumer devices, including cell phones and digital television, as well as in communication infrastructure, such as media servers and cellular base stations. Multiple programmable processors, along with custom hardware running in parallel, are needed to achieve the computation throughput required of such applications. Reviews important research in key areas related to the multiprocessor implementation of multi

  11. Coordinated scheduling for the downlink of cloud radio-access networks

    KAUST Repository

    Douik, Ahmed S.

    2015-09-11

    This paper addresses the coordinated scheduling problem in cloud-enabled networks. Consider the downlink of a cloud-radio access network (CRAN), where the cloud is only responsible for the scheduling policy and the synchronization of the transmit frames across the connected base-stations (BS). The transmitted frame of every BS consists of several time/frequency blocks, called power-zones (PZ), maintained at fixed transmit power. The paper considers the problem of scheduling users to PZs and BSs in a coordinated fashion across the network, by maximizing a network-wide utility under the practical constraint that each user cannot be served by more than one base-station, but can be served by one or more power-zones within each base-station frame. The paper solves the problem using a graph theoretical approach by introducing the scheduling graph in which each vertex represents an association of users, PZs and BSs. The problem is formulated as a maximum weight clique, in which the weight of each vertex is the benefit of the association represented by that vertex. The paper further presents heuristic algorithms with low computational complexity. Simulation results show the performance of the proposed algorithms and suggest that the heuristics perform near optimal in low shadowing environments. © 2015 IEEE.

  12. Coordinated Scheduling and Power Control in Cloud-Radio Access Networks

    KAUST Repository

    Douik, Ahmed

    2015-12-01

    This paper addresses the joint coordinated scheduling and power control problem in cloud-enabled networks. Consider the downlink of a cloud-radio access network (CRAN), where the cloud is only responsible for the scheduling policy, power control, and synchronization of the transmit frames across the single-antenna base-stations (BS). The transmit frame consists of several time/frequency blocks, called power-zones (PZ). The paper considers the problem of scheduling users to PZs and determining their power levels (PL), by maximizing the weighted sum-rate under the practical constraints that each user cannot be served by more than one base-station, but can be served by one or more power-zones within each base-station frame. The paper solves the problem using a graph theoretical approach by introducing the joint scheduling and power control graph formed by several clusters, where each is formed by a set of vertices, representing the possible association of users, BSs, and PLs for one specific PZ. The problem is, then, formulated as a maximumweight clique problem, in which the weight of each vertex is the sum of the benefits of the individual associations belonging to that vertex. Simulation results suggest that the proposed crosslayer scheme provides appreciable performance improvement as compared to schemes from recent literature.

  13. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  14. Shippingport Station Decommissioning Project Start of Physical Decommissioning

    International Nuclear Information System (INIS)

    Crimi, F. P.

    1987-01-01

    The Shippingport Atomic Power Station consists of the nuclear steam supply system and associated radioactive waste processing systems, which are owned by the United States Department of Energy, and the turbine-generator and balance of plant, which is owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania on seven acres of land leased by DOE from Duquesne Light Company. The Shippingport Station Decommissioning Project is being performed under contract to the DOE by the General Electric Company and its integrated subcontractor, Morrison-Knudsen Company. as the Decommissioning Operations Contractor. This paper describes the current status of the physical decommissioning work, which started September 1985. The preparations required to start a major decommissioning work effort in a safe and cost effective manner are discussed including the development and implementation of a cost/schedule control system. The detailed plan required to ensure that people, property, and procedures are ready in sufficient time to support the start of physical decommissioning is also discussed. The total estimated cost of the Shippingport Station Decommissioning Project should be $98.3 M, with the Project scheduled for completion in April 1990. As the decommissioning of the first commercial-scale nuclear power plant, the Shippingport Project is expected to set the standard for safe, cost-effective demolition of nuclear plants

  15. Automatic Traffic Recorder (ATR) Stations

    Data.gov (United States)

    Department of Homeland Security — The data included in the GIS Traffic Stations Version database have been assimilated from station description files provided by FHWA for Weigh-in-Motion (WIM), and...

  16. Weigh-in-Motion Stations

    Data.gov (United States)

    Department of Homeland Security — The data included in the GIS Traffic Stations Version database have been assimilated from station description files provided by FHWA for Weigh-in-Motion (WIM), and...

  17. Emergency Medical Service (EMS) Stations

    Data.gov (United States)

    Kansas Data Access and Support Center — EMS Locations in Kansas The EMS stations dataset consists of any location where emergency medical services (EMS) personnel are stationed or based out of, or where...

  18. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  19. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  20. Schedule optimization study implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  1. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  2. Air and radiation monitoring stations

    CERN Multimedia

    AUTHOR|(SzGeCERN)582709

    2015-01-01

    CERN has around 100 monitoring stations on and around its sites. New radiation measuring stations, capable of detecting even lower levels of radiation, were installed in 2014. Two members of HE-SEE group (Safety Engineering and Environment group) in front of one of the new monitoring stations.

  3. The engine maintenance scheduling by using reliability centered maintenance method and the identification of 5S application in PT. XYZ

    Science.gov (United States)

    Sembiring, N.; Panjaitan, N.; Saragih, A. F.

    2018-02-01

    PT. XYZ is a manufacturing company that produces fresh fruit bunches (FFB) to Crude Palm Oil (CPO) and Palm Kernel Oil (PKO). PT. XYZ consists of six work stations: receipt station, sterilizing station, thressing station, pressing station, clarification station, and kernelery station. So far, the company is still implementing corrective maintenance maintenance system for production machines where the machine repair is done after damage occurs. Problems at PT. XYZ is the absence of scheduling engine maintenance in a planned manner resulting in the engine often damaged which can disrupt the smooth production. Another factor that is the problem in this research is the kernel station environment that becomes less convenient for operators such as there are machines and equipment not used in the production area, slippery, muddy, scattered fibers, incomplete use of PPE, and lack of employee discipline. The most commonly damaged machine is in the seed processing station (kernel station) which is cake breaker conveyor machine. The solution of this problem is to propose a schedule plan for maintenance of the machine by using the method of reliability centered maintenance and also the application of 5S. The result of the application of Reliability Centered maintenance method is obtained four components that must be treated scheduled (time directed), namely: for bearing component is 37 days, gearbox component is 97 days, CBC pen component is 35 days and conveyor pedal component is 32 days While after identification the application of 5S obtained the proposed corporate environmental improvement measures in accordance with the principles of 5S where unused goods will be moved from the production area, grouping goods based on their use, determining the procedure of cleaning the production area, conducting inspection in the use of PPE, and making 5S slogans.

  4. An Experimental Analysis on Dispatching Rules for the Train Platforming Problem in Busy Complex Passenger Stations

    Directory of Open Access Journals (Sweden)

    Qiongfang Zeng

    2017-09-01

    platforming problem (TPP by using mixed integer linear programming and job shop scheduling theory. First, the operation procedures and scheduled time adjustment costs of different train types specific to busy complex passenger stations are explicitly represented. Second, a multi-criteria scheduling model (MCS for TPP without earliness and tardiness time window (ETTW and a time window scheduling model (TWS with ETTW for TPP are proposed. Third, various dispatching rules were designed by incorporating the dispatcher experiences with modern scheduling theory and a rule-based metaheuristic to solve the above model is presented. With solution improvement strategies analogous to those used in practice by dispatchers, the realistic size problems in acceptable time can be solved.

  5. Southeast Regional Experiment Station

    Science.gov (United States)

    1994-08-01

    This is the final report of the Southeast Regional Experiment Station project. The Florida Solar Energy Center (FSEC), a research institute of the University of Central Florida (UCF), has operated the Southeast Regional Experiment Station (SE RES) for the US Department of Energy (DOE) since September 1982. Sandia National Laboratories, Albuquerque (SNLA) provides technical program direction for both the SE RES and the Southwest Regional Experiment Station (SW RES) located at the Southwest Technology Development Institute at Las Cruces, New Mexico. This cooperative effort serves a critical role in the national photovoltaic program by conducting system evaluations, design assistance and technology transfer to enhance the cost-effective utilization and development of photovoltaic technology. Initially, the research focus of the SE RES program centered on utility-connected PV systems and associated issues. In 1987, the SE RES began evaluating amorphous silicon (a-Si) thin-film PV modules for application in utility-interactive systems. Stand-alone PV systems began receiving increased emphasis at the SE RES in 1986. Research projects were initiated that involved evaluation of vaccine refrigeration, water pumping and other stand-alone power systems. The results of this work have led to design optimization techniques and procedures for the sizing and modeling of PV water pumping systems. Later recent research at the SE RES included test and evaluation of batteries and charge controllers for stand-alone PV system applications. The SE RES project provided the foundation on which FSEC achieved national recognition for its expertise in PV systems research and related technology transfer programs. These synergistic products of the SE RES illustrate the high visibility and contributions the FSEC PV program offers to the DOE.

  6. Scheduling algorithms for rapid imaging using agile Cubesat constellations

    Science.gov (United States)

    Nag, Sreeja; Li, Alan S.; Merrick, James H.

    2018-02-01

    Distributed Space Missions such as formation flight and constellations, are being recognized as important Earth Observation solutions to increase measurement samples over space and time. Cubesats are increasing in size (27U, ∼40 kg in development) with increasing capabilities to host imager payloads. Given the precise attitude control systems emerging in the commercial market, Cubesats now have the ability to slew and capture images within short notice. We propose a modular framework that combines orbital mechanics, attitude control and scheduling optimization to plan the time-varying, full-body orientation of agile Cubesats in a constellation such that they maximize the number of observed images and observation time, within the constraints of Cubesat hardware specifications. The attitude control strategy combines bang-bang and PD control, with constraints such as power consumption, response time, and stability factored into the optimality computations and a possible extension to PID control to account for disturbances. Schedule optimization is performed using dynamic programming with two levels of heuristics, verified and improved upon using mixed integer linear programming. The automated scheduler is expected to run on ground station resources and the resultant schedules uplinked to the satellites for execution, however it can be adapted for onboard scheduling, contingent on Cubesat hardware and software upgrades. The framework is generalizable over small steerable spacecraft, sensor specifications, imaging objectives and regions of interest, and is demonstrated using multiple 20 kg satellites in Low Earth Orbit for two case studies - rapid imaging of Landsat's land and coastal images and extended imaging of global, warm water coral reefs. The proposed algorithm captures up to 161% more Landsat images than nadir-pointing sensors with the same field of view, on a 2-satellite constellation over a 12-h simulation. Integer programming was able to verify that

  7. Designing Space Station

    Science.gov (United States)

    1986-01-01

    An overview of preparations for the construction of Space Station Freedom (SSF) is presented. The video includes footage of astronauts testing materials for erectable structures in space both in the Shuttle bay while in orbit and in a neutral buoyancy tank at McDonald Douglas' Underwater Test Facility. Also shown are footage of robot systems that will assist the astronauts in building SSF, a computer simulation of an Orbiting Maneuvering Vehicle, solar dynamic mirrors that will power SSF, and mockups of the living quarters of the SSF.

  8. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  9. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  10. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  11. The delivery commitment schedule process

    International Nuclear Information System (INIS)

    Vance, S.A.

    1991-01-01

    The Standard Contract for the Disposal of Spent Nuclear Fuel (SNF) and/or High-Level Radioactive Waste (HLW) (herein referred to as the Contract) tasked the U.S. Department of Energy (DOE) with the development of a transportation system adequate to service both utilities and the waste management system (WMS). Due to the nature of the Contract, this development must take place prior to the utilities' final determination of the specific SNF that they will deliver during each allocation period. The Delivery Commitment Schedule (DCS) process is designed to initiate the identification of the SNF that will be delivered at a given time in order to aid in the development of the transportation system

  12. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  13. Shippingport station decommissioning project ALARA Program

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F.P. [Lockheed Environmental Systems and Technology Co., Houston, TX (United States)

    1995-03-01

    Properly planned and implemented ALARA programs help to maintain nuclear worker radiation exposures {open_quotes}As Low As Reasonably Achievable.{close_quotes}. This paper describes the ALARA program developed and implemented for the decontamination and decommissioning (D&D) of the Shippingport Atomic Power Station. The elements required for a successful ALARA program are discussed along with examples of good ALARA practices. The Shippingport Atomic Power Station (SAPS) was the first commercial nuclear power plant to be built in the United States. It was located 35 miles northwest of Pittsburgh, PA on the south bank of the Ohio river. The reactor plant achieved initial criticality in December 1959. During its 25-year life, it produced 7.5 billion kilowatts of electricity. The SAPS was shut down in October 1982 and was the first large-scale U.S. nuclear power plant to be totally decommissioned and the site released for unrestricted use. The Decommission Project was estimated to take 1,007 man-rem of radiation exposure and $.98.3 million to complete. Physical decommissioning commenced in September 1985 and was completed in September 1989. The actual man-rem of exposure was 155. The project was completed 6 months ahead of schedule at a cost of $91.3 million.

  14. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  15. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... for planning, scheduling and controlling projects. However, criticism has been raised on the CPM method, specifically in the case of construction projects, for deficient management of construction work and discontinuous flow of resources. Alternative scheduling techniques, often called repetitive or linear...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  16. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  17. Nuclear hydrogen power stations

    International Nuclear Information System (INIS)

    Eroshov, M.E.

    1976-01-01

    Short information about investigations on hydrogen energetics being carried out in the USSR as well as a review of the world literature on this subject are given. Combined cycles of thermochemical and electrochemical reactions applied for hydrogen and oxigen production from water are shown to be of interest, as a number of reactions in a cycle may be reduced to two, and the temperature of processes may be decreased to the temperature range specific to modern reactors. Construction features of nuclear-hydrogen power stations producing hydrogen through the use of thermo-electro-chemical cycles are considered. It is shown that at this stage it is possible to reduce time and expenses needed for realization of hydrogen production on a wide scale as compared to other reaction cycles requiring high temperatures and consequently, construction of high-temperature reactors. The conditions of energy and water transport at great distances by using hydrogen lines and the possibilities of development of desert and arid lands by using this mode of operation are considered. Possible ecological effect of hydrogen energetics development on the environment is pointed out, in particular, when power complexes are concentrated on a limited area. It is shown that it is reasonable to locate nuclear-hydrogen stations on shores

  18. Nuclear hydrogen power stations

    International Nuclear Information System (INIS)

    Eroshov, M.E.

    1976-01-01

    Short information about investigations on hydrogen energetics being carried out in the USSR as well as a review of the world literature on this subject are given. Combined cycles of thermochemical and electrochemical reactions applied for hydrogen and oxygen production from water are shown to be of interest, as a number of reactions in a cycle may be reduced to two, and the temperature of processes may be decreased to the temperature range specific to modern reactors. Construction features of nuclear-hydrogen power stations producing hydrogen through the use of thermo-electrochemical cycles are considered. It is shown that at this stage it is possible to reduce time and expenses needed for realization of hydrogen production on a wide scale as compared to other reaction cycles requiring high temperatures and consequently, construction of high-temperature reactors. The conditions of energy and water transport at great distances by using hydrogen lines and the possibilities of development of desert and arid lands by using this mode of operation are considered. Possible ecological effect of hydrogen energetics development on the environment is pointed out, in particular, when power complexes are concentrated on a limited area. It is shown that it is reasonable to locate nuclear-hydrogen stations on shores

  19. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  20. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors

    OpenAIRE

    Zilanawala, A.

    2017-01-01

    Objectives: Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9–5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Co...

  1. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  2. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  3. Throughput Gain Using Threshold-Based Multiuser Scheduling in WiMAX OFDMA

    Directory of Open Access Journals (Sweden)

    Sulyman AhmedIyanda

    2011-01-01

    Full Text Available This paper presents the analysis of the throughput enhancement possible using threshold-based multiuser scheduling in WiMAX OFDMA. We consider a point-to-multipoint (PMP WiMAX network where base station (BS schedules downlink packets for simultaneous transmissions to multiple users using the WiMAX OFDMA system. WiMAX OFDMA standard specifies several subcarrier permutation options, such as the partial usage of subcarriers (PUSC, full usage of subcarrier (FUSC, and the band adaptive modulation and coding (band-AMC among others, for mapping the physical subcarriers into logical subchannels assigned to users by the BS schedulers. In this paper, we propose the use of threshold testing prior to the process of subchannel assignment to users by the BS scheduler, as a means of throughput enhancement. In the proposed threshold-based multiuser scheduling scheme, the BS scheduler selects at any time instant users whose channel gains in the available subchannels equal or exceed a predetermined energy threshold. Thus, only users who can maximize BS throughput on the available subchannels are assigned data transmission opportunities which enhance the BS data rate, albeit at the expense of fairness to users. We quantify the throughput enhancement of the proposed system and illustrate its benefits by numerical simulations.

  4. Local control stations

    International Nuclear Information System (INIS)

    Brown, W.S.; Higgins, J.C.; Wachtel, J.A.

    1993-01-01

    This paper describes research concerning the effects of human engineering design at local control stations (i.e., operator interfaces located outside the control room) on human performance and plant safety. The research considered both multifunction panels (e.g. remote shutdown panels) as well as single-function interfaces (e.g., valves, breakers, gauges, etc.). Changes in performance shaping factors associated with variations in human engineering at LCSs were estimated based on expert opinion. By means of a scaling procedure, these estimates were used to modify the human error probabilities in a PRA model, which was then employed to generate estimates of plant risk and scoping-level value/impact ratios for various human engineering upgrades. Recent documentation of human engineering deficiencies at single-function LCSs was also reviewed, and an assessment of the current status of LCSs with respect to human engineering was conducted

  5. Innovative Railway Stations

    Science.gov (United States)

    Rzepnicka, Sylwia; Załuski, Daniel

    2017-10-01

    In relation to modern demographic trends, evolving technologies and environment-friendly solutions increases the potential of rail considered as sustainable form of public transport. Contemporary tendencies of designing railway stations in Europe are focused on lowering energy consumption and reducing carbon emission. The main goal of the designers is to create a friendly and intuitive space for its users and at the same time a building that uses renewable energy sources and minimizes negative impact on the environment by the increase of biologically active areas, reuse of rainwater and greywater, innovative heating and cooling solutions and reduction of energy losses. The optimisation of a life circle in railway architecture introduces new approach to passenger service. Examples mentioned in the content of this article help to synthesize changes in approach to the design within the context of sustainability.

  6. Central Station Design Options

    DEFF Research Database (Denmark)

    2011-01-01

    The purpose of EDISON Work Package 4.1 is the evaluation of possible Central (charging) Stations design options for making possible the public charging of Electric Vehicles (EVs). A number of scenarios for EVs are assessed, with special emphasis on the options of Fast Charging and Battery Swapping....... With the 3-phase AC quick charging options of 11, 22 kW and 43 kW, (IEC 62196, EN60038, EN 61851) both the Danish and Bornholm environments offer a good chance for EV integration [1]. Dealing with Fast Charging, the study determined that 300kW Fast Charging, which corresponds to 10 minutes charging for a 50...... charging, rated at 50 kW, fast charging would be easier in both Denmark and Bornholm scenarios. For each scenario and charging power level, the possible number of EVs is estimated and finally architectural design options are proposed. Technical assessment is performed for evaluating the benefits...

  7. 47 CFR 80.1073 - Radio operator requirements for ship stations.

    Science.gov (United States)

    2010-10-01

    .... 80.1073 Section 80.1073 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Global Maritime Distress and Safety System (GMDSS... selecting HF DSC guard channels and receiving scheduled maritime safety information broadcasts; (4...

  8. [Shippingport Station Decommissioning Project]: FY 1987 annual progress report, October 1, 1986-September 30, 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1987. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 3 refs., 9 figs., 4 tabs

  9. A multi-purpose tactile vest for astronauts in the international space station

    NARCIS (Netherlands)

    Erp, J.B.F. van; Veen, H.A.H.C. van

    2003-01-01

    During a 10 day taxiflight to the International Space Station (ISS) in 2004, Dutch astronaut André Kuipers is scheduled to test a multi-purpose vibrotactile vest. The main application of the vest is supporting the astronaut's orientation awareness. To this end, we employ an artificial gravity vector

  10. International Space Station Science Information for Public Release on the NASA Web Portal

    Science.gov (United States)

    Robinson, Julie A.; Tate, Judy M.

    2009-01-01

    This document contains some of the descriptions of payload and experiment related to life support and habitation. These describe experiments that have or are scheduled to fly on the International Space Station. There are instructions, and descriptions of the fields that make up the database. The document is arranged in alphabetical order by the Payload

  11. Shippingport Station Decommissioning Project: FY 1986 annual progress report, October 1, 1985 through September 30, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1986. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 9 refs., 4 figs., 3 tabs

  12. Remerschen nuclear power station with BBR pressurized water reactor

    International Nuclear Information System (INIS)

    Hoffmann, J.P.

    1975-01-01

    On the basis of many decades of successful cooperation in the electricity supply sector with the German RWE utility, the Grand Duchy of Luxemburg and RWE jointly founded Societe Luxembourgeoise d'Energie Nucleaire S.A. (SENU) in 1974 in which each of the partners holds a fifty percent interest. SENU is responsible for planning, building and operating this nuclear power station. Following an international invitation for bids on the delivery and turnkey construction of a nuclear power station, the consortium of the German companies of Brown, Boveri and Cie. AG (BBC), Babcock - Brown Boveri Reaktor GmbH (BBR) and Hochtief AG (HT) received a letter of intent for the purchase of a 1,300 MW nuclear power station equipped with a pressurized water reactor. The 1,300 MW station of Remerschen will be largely identical with the Muelheim-Kaerlich plant under construction by the same consortium near Coblence on the River Rhine since early 1975. According to present scheduling, the Remerschen nuclear power station could start operation in 1981. (orig.) [de

  13. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  14. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Braaksma, Aleida; Vliegen, Ingrid M.H.; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  15. Discharges from nuclear power stations

    International Nuclear Information System (INIS)

    1991-02-01

    HM Inspectorate of Pollution commissioned, with authorising responsibilities in England and Wales, a study into the discharges of radioactive effluents from Nuclear Power Stations. The study considered arisings from nuclear power stations in Europe and the USA and the technologies to treat and control the radioactive discharges. This report contains details of the technologies used at many nuclear power stations to treat and control radioactive discharges and gives, where information was available, details of discharges and authorised discharge limits. (author)

  16. Incremental Scheduling Engines: Cost Savings through Automation

    Science.gov (United States)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  17. Appointment scheduling with unscheduled arrivals and reprioritization

    NARCIS (Netherlands)

    Borgman, Nardo J.; Vliegen, Ingrid M.H.; Boucherie, Richard J.; Hans, Erwin W.

    2017-01-01

    Inspired by the real life problem of a radiology department in a Dutch hospital, we study the problem of scheduling appointments, taking into account unscheduled arrivals and reprioritization. The radiology department offers CT diagnostics to both scheduled and unscheduled patients. Of these

  18. Stochastic Online Scheduling on Unrelated Machines

    NARCIS (Netherlands)

    Gupta, Varun; Moseley, Benjamin; Uetz, Marc Jochen; Xie, Qiaomin

    2016-01-01

    We derive the first performance guarantees for a combinatorial online algorithm that schedules stochastic, nonpreemptive jobs on unrelated machines to minimize the expectation of the total weighted completion time. Prior work on unrelated machine scheduling with stochastic jobs was restricted to the

  19. A question of matching rather than scheduling

    NARCIS (Netherlands)

    van de Velde, S.L.

    1995-01-01

    Proper scheduling maintenance for Air Force C-130 aircraft involves the prevention of mismatches concerning the availability of the aircraft and a new wing kit which would prolong its use. Scheduling maintenance problems include the designation of wing kits in the production sequence to match for a

  20. Scheduling parameters in flexible manufacturing cells

    NARCIS (Netherlands)

    Slomp, J.; Gaalman, G.J.C.; Ahmad, M.M.; Sullivan, W.G.; Migliore, H.; Randhawa, S.

    1998-01-01

    The existence of a well-designed scheduling procedure is a major condition for an effective integration of a flexible manufacturing cell (FMC) in the material flow of a firm. This paper shows the presence and relative importance of three parameter types in the scheduling of operations on a flexible

  1. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  2. A Case Against Periodic Jukebox Scheduling

    NARCIS (Netherlands)

    Lijding, M.E.M.; Hanssen, F.T.Y.; Jansen, P.G.

    This paper presents the jukebox early quantum scheduler (JEQS). JEQS is a periodic jukebox scheduler for a Video-on-Demand system. JEQS uses the jukebox robots in a cyclic way and the time is divided in constant units called quanta. A quantum is the maximum time needed to unload and load all the

  3. Crew Scheduling for Netherlands Railways: "destination: customer"

    NARCIS (Netherlands)

    L.G. Kroon (Leo); M. Fischetti (Matteo)

    2000-01-01

    textabstract: In this paper we describe the use of a set covering model with additional constraints for scheduling train drivers and conductors for the Dutch railway operator NS Reizigers. The schedules were generated according to new rules originating from the project "Destination: Customer"

  4. DEVELOPMENT OF A MAINTENANCE SCHEDULING MODEL FOR ...

    African Journals Online (AJOL)

    The method is capable of stating the overhaul frequency of each machine within this time period. For convenience in the formulation of the model, maintenance schedule was divided into two parts, namely minor and major maintenance schedules. During a minor maintenance, an individual machine is checked and reset, ...

  5. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-01-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes cost and schedule data through June 1989

  6. A Heuristic Approach to Scheduling University Timetables.

    Science.gov (United States)

    Loo, E. H.; And Others

    1986-01-01

    Categories of facilities utilization and scheduling requirements to be considered when using a heuristic approach to timetabling are described together with a nine-step algorithm and the computerized timetabling system, Timetable Schedules System (TTS); TTS utilizes heuristic approach. An example demonstrating use of TTS and a program flowchart…

  7. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  8. Unrelated Machine Scheduling with Stochastic Processing Times

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous processors and a certain degree of uncertainty about the processing times of jobs. In this paper we address both, and study for the first time a scheduling problem that combines the classical unrelated

  9. Machine scheduling with resource dependent processing times

    NARCIS (Netherlands)

    Grigoriev, A.; Sviridenko, M.; Uetz, Marc Jochen

    We consider machine scheduling on unrelated parallel machines with the objective to minimize the schedule makespan. We assume that, in addition to its machine dependence, the processing time of any job is dependent on the usage of a discrete renewable resource, e.g. workers. A given amount of that

  10. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  11. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  12. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  13. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Document Server

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  14. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  15. Photochemical Assessment Monitoring Stations (PAMS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Photochemical Assessment Monitoring Stations (PAMS). This file provides information on the numbers and distribution (latitude/longitude) of air monitoring sites...

  16. Improved utilization and responsiveness with gang scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Feitelson, D.G., [Institute of Computer Science, The Hebrew University of Jerusalem (IsraelL); Jette, M.A. [Lawrence Livermore National Lab., CA (United States)

    1996-10-01

    Most commercial multicomputers use space-slicing schemes in which each scheduling decision has an unknown impact on the future: should a job be scheduled, risking that it will block other larger jobs later, or should the processors be left idle for now in anticipation of future arrivals? This dilemma is solved by using gang scheduling, because then the impact of each decision is limited to its time slice, and future arrivals can be accommodated in other time slices. This added flexibility is shown to improve overall system utilization and responsiveness. Empirical evidence from using gang scheduling on a Cray T3D installed at Lawrence Livermore National Lab corroborates these results, and shows conclusively that gang scheduling can be very effective with current technology. 29 refs., 10 figs., 6 tabs.

  17. Station History Of The Seismic Station In Ahmadu Bello University ...

    African Journals Online (AJOL)

    The station history of the Ahmadu Bello University, Zaria seismic station has been carried out. A total of two hundred and thirty (230) events at epicentral distances between 24o and 180o were selected from recordings covering the period January 1985 to December 1992. Dominants in the selected events are events from ...

  18. Multiple Power-Saving MSSs Scheduling Methods for IEEE802.16e Broadband Wireless Networks

    Science.gov (United States)

    2014-01-01

    This work proposes two enhanced multiple mobile subscriber stations (MSSs) power-saving scheduling methods for IEEE802.16e broadband wireless networks. The proposed methods are designed for the Unsolicited Grant Service (UGS) of IEEE802.16e. To reduce the active periods of all power-saving MSSs, the base station (BS) allocates each MSS fewest possible transmission frames to retrieve its data from the BS. The BS interlaces the active periods of each MSS to increase the amount of scheduled MSSs and splits the overflowing transmission frames to maximize the bandwidth utilization. Simulation results reveal that interlacing the active periods of MSSs can increase the number of scheduled MSSs to more than four times of that in the Direct scheduling method. The bandwidth utilization can thus be improved by 60%–70%. Splitting the overflowing transmission frames can improve bandwidth utilization by more than 10% over that achieved using the method of interlacing active periods, with a sacrifice of only 1% of the sleep periods in the interlacing active period method. PMID:24523656

  19. Multiple Power-Saving MSSs Scheduling Methods for IEEE802.16e Broadband Wireless Networks

    Directory of Open Access Journals (Sweden)

    Shih-Chang Huang

    2014-01-01

    Full Text Available This work proposes two enhanced multiple mobile subscriber stations (MSSs power-saving scheduling methods for IEEE802.16e broadband wireless networks. The proposed methods are designed for the Unsolicited Grant Service (UGS of IEEE802.16e. To reduce the active periods of all power-saving MSSs, the base station (BS allocates each MSS fewest possible transmission frames to retrieve its data from the BS. The BS interlaces the active periods of each MSS to increase the amount of scheduled MSSs and splits the overflowing transmission frames to maximize the bandwidth utilization. Simulation results reveal that interlacing the active periods of MSSs can increase the number of scheduled MSSs to more than four times of that in the Direct scheduling method. The bandwidth utilization can thus be improved by 60%–70%. Splitting the overflowing transmission frames can improve bandwidth utilization by more than 10% over that achieved using the method of interlacing active periods, with a sacrifice of only 1% of the sleep periods in the interlacing active period method.

  20. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  1. Stanwell power station project

    Energy Technology Data Exchange (ETDEWEB)

    Mills, David R; J Dey, Christopher [University of Sidney, Sidney (Australia); Morrison, Graham L [University of New South Wales, Sidney (Australia)

    2000-07-01

    This paper describes the Compact Linear Fresnel Reflector (CLFR) being developed for installation at the Stanwell power station in Queensland Australia. Stanwell Corporation Limited (SCL). Solahart International, Solsearch Pty. Ltd. And the universities of Sidney and New South Wales are cooperating in the project, and this first plant being partly funded by the Australian Greenhouse Office. The solar plant will be attached to a 1440 MW(e) coal fired plant. The 17000 m{sup 2} array will be the largest array in Australia, producing a peak of 13 MW of thermal energy which will offset the use of coal in the generation of electricity. It will use direct steam generation and will feed either steam or hot water at 265 Celsius degrees directly into the power station preheating cycle. The CLFR system, first developed by the University of Sidney and Solsearch Pty. Ltd., is simple and offers small reflector size, low structural cost, fixed receiver geometry. Initial installed plant costs are approximately US$1000 per kWe, but this includes the effect of high up-front design costs and the cost should drop substantially in the second and subsequent plants. [Spanish] Proyecto de la Planta Electrica Stanwell este articulo describe el Reflector Lineal Compacto Fresnel (CLFR, siglas en ingles) que se esta desarrollando para la instalacion de la planta electrica Stanwell en Queensland, Australia. La Corporacion Stanwell Limited (SCL), Solahart International, Solsearch Pty. Ltd., las universidades de Sidney y de New South Wales estan cooperando en este proyecto, y esta primera planta esta parcialmente auspiciada por la Australian Greenhouse Office. La planta solar sera anexa a una planta de carbon de 1440 MW(e). Este arreglo de 17000 m{sup 2} sera el mayor en Australia y producira un maximo de 13 MW en energia termica la cual contrarrestara el uso del carbon en la generacion de electricidad. Utilizara generacion con vapor directo y alimentara ya sea vapor o agua caliente a 265 grados

  2. 75 FR 74719 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Science.gov (United States)

    2010-12-01

    ... Compliance With Antitrust Laws 7. To ensure the competitiveness of the auction process, 47 CFR 1.2105(c.... Antitrust Laws 25. Applicants are also reminded that, regardless of compliance with the Commission's rules, they remain subject to the antitrust laws, which are designed to prevent anticompetitive behavior in...

  3. Automation of the space station core module power management and distribution system

    Science.gov (United States)

    Weeks, David J.

    1988-01-01

    Under the Advanced Development Program for Space Station, Marshall Space Flight Center has been developing advanced automation applications for the Power Management and Distribution (PMAD) system inside the Space Station modules for the past three years. The Space Station Module Power Management and Distribution System (SSM/PMAD) test bed features three artificial intelligence (AI) systems coupled with conventional automation software functioning in an autonomous or closed-loop fashion. The AI systems in the test bed include a baseline scheduler/dynamic rescheduler (LES), a load shedding management system (LPLMS), and a fault recovery and management expert system (FRAMES). This test bed will be part of the NASA Systems Autonomy Demonstration for 1990 featuring cooperating expert systems in various Space Station subsystem test beds. It is concluded that advanced automation technology involving AI approaches is sufficiently mature to begin applying the technology to current and planned spacecraft applications including the Space Station.

  4. Solar panels for the International Space Station are uncrated and moved in the SSPF

    Science.gov (United States)

    1998-01-01

    In the Space Station Processing Facility, a worker (left) guides the lifting of solar panels for the International Space Station (ISS). The panels are the first set of U.S.-provided solar arrays and batteries for ISS, scheduled to be part of mission STS-97 in December 1999. The mission, fifth in the U.S. flights for construction of ISS, will build and enhance the capabilities of the Space Station. It will deliver the solar panels as well as radiators to provide cooling. The Shuttle will spend 5 days docked to the station, which at that time will be staffed by the first station crew. Two space walks will be conducted to complete assembly operations while the arrays are attached and unfurled. A communications system for voice and telemetry also will be installed.

  5. Controversial power station

    International Nuclear Information System (INIS)

    Marcan, P.

    2008-01-01

    When information on plans to build a power station in Trebisov first appeared reactions differed. A 40-billion investment in a town with more than 20% unemployment seemed attractive. But some people did not like the idea of having a power plant located in the town. Around one year after the investment was officially announced TREND returned to Trebisov. In the meantime the investor has managed to overcome one of the biggest obstacles on its way to building a new power plant. The ministry responsible gave the environmental study a positive rating. But objectors are still not sure that everything is fine. They claim that the study misinterprets data and that the ministry did not show expertise when evaluating it. 'Is it possible that a coal power plant located in a town would have twice as many positive effects on peoples' health than negative ones? Why don't we build them everywhere?'asked the chairman of the civic society, Trebisov nahlas, Gejza Gore. The developer of the project, Ceskoslovenska energeticka spolocnost (CES), Kosice is fighting back and claims that their counterpart lacks professional arguments. In the meantime it is preparing for area management proceedings. Trebisov is also involved in the discussion and claims that the town planning scheme does not include such a project. The Ministry of Construction has a different opinion. In the opinion of the Ministry the town planning scheme allows a 885-megawatt power plant to be built only a few hundred meters away from housing estates. (author)

  6. Swedish encapsulation station review

    International Nuclear Information System (INIS)

    Andersson, Sven Olof; Brunzell, P.; Heibel, R.; McCarthy, J.; Pennington, C.; Rusch, C.; Varley, G.

    1998-06-01

    In the Encapsulation Station (ES) Review performed by NAC International, a number of different areas have been studied. The main objectives with the review have been to: Perform an independent review of the cost estimates for the ES presented in SKB's document 'Plan 1996'. This has been made through comparisons between the ES and BNFL's Waste Encapsulation Plant (WEP) at Sellafield as well as with the CLAB facility. Review the location of the ES (at the CLAB site or at the final repository) and its interaction with other parts of the Swedish system for spent fuel management. Review the logistics and plant capacity of the ES. Identify important safety aspects of the ES as a basis for future licensing activities. Based on NAC International's experience of casks for transport and storage of spent fuel, review the basic design of the copper/steel canister and the transport cask. This review insides design, manufacturing, handling and licensing aspects. Perform an overall comparison between the ES project and the CLAB project with the objective to identify major project risks and discuss their mitigation

  7. Swedish encapsulation station review

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Sven Olof; Brunzell, P.; Heibel, R.; McCarthy, J.; Pennington, C.; Rusch, C.; Varley, G. [NAC International, Zuerich (Switzerland)

    1998-06-01

    In the Encapsulation Station (ES) Review performed by NAC International, a number of different areas have been studied. The main objectives with the review have been to: Perform an independent review of the cost estimates for the ES presented in SKB`s document `Plan 1996`. This has been made through comparisons between the ES and BNFL`s Waste Encapsulation Plant (WEP) at Sellafield as well as with the CLAB facility. Review the location of the ES (at the CLAB site or at the final repository) and its interaction with other parts of the Swedish system for spent fuel management. Review the logistics and plant capacity of the ES. Identify important safety aspects of the ES as a basis for future licensing activities. Based on NAC International`s experience of casks for transport and storage of spent fuel, review the basic design of the copper/steel canister and the transport cask. This review insides design, manufacturing, handling and licensing aspects. Perform an overall comparison between the ES project and the CLAB project with the objective to identify major project risks and discuss their mitigation 19 refs, 9 figs, 35 tabs

  8. Alternative schedules of levothyroxine administration.

    Science.gov (United States)

    Geer, Melanie; Potter, Donald Mark; Ulrich, Heather

    2015-03-01

    Published evidence on bedtime versus prebreakfast administration of levothyroxine is reviewed. Because levothyroxine absorption has been shown to increase when the drug is administered to patients in a fasted state, the standard recommendation is that levothyroxine be taken one half to one hour prior to breakfast and at least four hours before or after potentially interacting drugs. However, compliance with this recommendation may be problematic for patients with unpredictable or variable schedules. A literature search identified four published studies of bedtime levothyroxine dosing. Two of the studies demonstrated a significant decrease in levels of thyroid-stimulating hormone (TSH) with levothyroxine administration at bedtime versus 30 minutes before breakfast, one study showed an increase in TSH when levothyroxine was taken at bedtime versus one hour before breakfast, and one study found no significant differences in TSH levels or other thyroid function monitoring limitations with bedtime versus standard dosing in subjects naive to levothyroxine therapy. The inconsistent study findings may be attributable to a number of variables, including dietary differences among the study populations, the use of potentially interacting supplements in one study, and variable intervals between levothyroxine administration and food intake. Neither dosing method correlated with substantial changes in assessments of quality of life or symptom severity; in two of the studies, patients indicated a preference for bedtime levothyroxine administration. Based on the available literature, bedtime administration of levothyroxine is an option for patients with hypothyroidism who want to avoid taking their medication with food. Copyright © 2015 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  9. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  10. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  11. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  12. Using icons to convey medication schedule information.

    Science.gov (United States)

    Morrow, D G; Leirer, V O; Andrassy, J M

    1996-08-01

    We examined older adult comprehension and memory for medication schedules conveyed by different types of visual icons as well as text. Three icons were compared: a timeline, a pair of 12 h clocks (one for AM and one for PM hours) and a 24 h clock. In Experiment 1, older and younger participants paraphrased and then recalled schedules that were conveyed by the three icons or by text. Text and timeline schedules were paraphrased more accurately than either clock icon. Paraphrase errors suggested that subjects had trouble integrating schedule information across the two 12 h clocks. Analysis of paraphrase times showed that the text schedule was paraphrased most quickly, followed by the timeline, the 24 h clock and the 12 h clock. No differences were found for the accuracy of recalling the icon and text schedules. Experiment 2 examined free and cued recall after limited study time by older adults. Because text superiority in Experiment 1 may have reflected greater familiarity with text than with icons, recall was examined across four trials in Experiment 2. Text was recalled most accurately, followed by the timeline, the 24 h clock and the 12 h clock. Study-test trials did not influence recall. Text schedules may have been generally more effective than the icons because of their greater familiarity. The timeline may have been the most effective icon because it was more compact and familiar than the clock icons used in the study. The findings suggest that including such icons in medication instructions requires training.

  13. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  14. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  15. NEWS OF THE NATIONAL IMMUNIZATION SCHEDULE

    Directory of Open Access Journals (Sweden)

    O. V. Shamsheva

    2014-01-01

    Full Text Available The article presents the changes Immunization Schedule Russia introduced in 2014. In new Schedule now is the vaccination against pneumococcal disease for all children of 2 months with revaccination at 4 and 15 months old; excluded from the Schedule second revaccination against tuberculosis. At risk groups to be vaccinated against the flu, entered pregnant women and persons subject to military conscription. Recommendations on use of vaccines containing relevant antigens for the Russian Federation, to provide maximum effectiveness of immunization and vaccines that do not contain preservatives in children under 1 year of age. Offered to create a council of experts in the field of vaccinology and vaccine prevention

  16. Simultaneous scheduling of machines and mobile robots

    DEFF Research Database (Denmark)

    Dang, Vinh Quang; Nielsen, Izabela Ewa

    2013-01-01

    This paper deals with the problem of simultaneously scheduling machines and a number of autonomous mobile robots in a flexible manufacturing system (FMS). Besides capability of transporting materials between machines, the considered mobile robots are different from other material handling devices...... in terms of their advanced ability to perform tasks at machines by using their manipulation arms. The mobile robots thus have to be scheduled in relation to scheduling of machines so as to increase the efficiency of the overall system. The performance criterion is to minimize time required to complete all...

  17. Efficient Resource Management for Uplink Scheduling in IEEE 802.16e Standard

    Directory of Open Access Journals (Sweden)

    A.R. Rahiman

    2017-01-01

    Full Text Available The IEEE 802.16e standard, known as mobile Worldwide Interoperability for Microwave Access (WiMAX becomes the most demanding broadband wireless access (BWA technology recently. Its main advantage is rapid delivery of services in remote areas due to the cost efficiency factor. The base station (BS supports data rate up to 70 Mbps, mobile stations with 5–15 km length of coverage, and for the fixed stations the wireless access range up to 50 km. To resolve the bandwidth contention issue and guarantee seamless packet transmission from the subscriber stations (SS to the BS, the uplink (UL traffic scheduling must be efficient and reliable. This paper studies the work on the UL scheduling algorithm, namely minimum rest time (MRT. The MRT goal is to strengthen the packet transferring time between the SS and the BS by refining the pre-stipulated expired time and the deadline time of the earliest expiry first (EEF and earliest deadline first (EDF hybrid algorithms. These legacy algorithms are inadequate to support the multi-class traffic systems due to the shortage of quality of service (QoS parameters featuring. Moreover, the algorithms are highly static. Using the Omnet++ with the relevant performance metrics the obtained results confirmed the MRT outperforms effectively from the legacy algorithms.

  18. Seismometer array station processors

    International Nuclear Information System (INIS)

    Key, F.A.; Lea, T.G.; Douglas, A.

    1977-01-01

    A description is given of the design, construction and initial testing of two types of Seismometer Array Station Processor (SASP), one to work with data stored on magnetic tape in analogue form, the other with data in digital form. The purpose of a SASP is to detect the short period P waves recorded by a UK-type array of 20 seismometers and to edit these on to a a digital library tape or disc. The edited data are then processed to obtain a rough location for the source and to produce seismograms (after optimum processing) for analysis by a seismologist. SASPs are an important component in the scheme for monitoring underground explosions advocated by the UK in the Conference of the Committee on Disarmament. With digital input a SASP can operate at 30 times real time using a linear detection process and at 20 times real time using the log detector of Weichert. Although the log detector is slower, it has the advantage over the linear detector that signals with lower signal-to-noise ratio can be detected and spurious large amplitudes are less likely to produce a detection. It is recommended, therefore, that where possible array data should be recorded in digital form for input to a SASP and that the log detector of Weichert be used. Trial runs show that a SASP is capable of detecting signals down to signal-to-noise ratios of about two with very few false detections, and at mid-continental array sites it should be capable of detecting most, if not all, the signals with magnitude above msub(b) 4.5; the UK argues that, given a suitable network, it is realistic to hope that sources of this magnitude and above can be detected and identified by seismological means alone. (author)

  19. Starshade Observation Scheduling for WFIRST

    Science.gov (United States)

    Soto, Gabriel; Garrett, Daniel; Delacroix, Christian; Savransky, Dmitry

    2018-01-01

    An exoplanet direct imaging mission can employ an external starshade for starlight suppression to achieve higher contrasts and potentially higher throughput than with an internal coronagraph. This separately-launched starshade spacecraft is assumed to maintain a single, constant separation distance from the space telescope—for this study, the Wide Field Infrared Survey Telescope (WFIRST)—based on a designated inner working angle during integration times. The science yield of such a mission can be quantified using the Exoplanet Open-Source Imaging Simulator (EXOSIMS): this simulator determines the distributions of mission outcomes, such as the types and amount of exoplanet detections, based on ensembles of end-to-end simulations of the mission. This study adds a starshade class to the survey simulation module of EXOSIMS and outlines a method for efficiently determining observation schedules. The new starshade class solves boundary value problems using circular restricted three-body dynamics to find fast, high-accuracy estimates of the starshade motion while repositioning between WFIRST observations. Fuel usage dictates the mission lifetime of the starshade given its limited fuel supply and is dominated by the Δv used to reposition the starshade between the LOS of different targets; the repositioning time-of-flight is kept constant in this study. A starshade burns less fuel to reach certain target stars based on their relative projected positions on a skymap; other targets with costly transfers can be filtered out to increase the starshade mission duration. Because the initial target list can consist of nearly 2000 stars, calculating the Δv required to move the starshade to every other star on the target list would be too computationally expensive and renders running ensembles of survey simulations infeasible. Assuming the starshade begins its transfer at the LOS of a certain star, a Δv curve is approximated for the remaining target stars based on their right

  20. Channel access delay and buffer distribution of two-user opportunistic scheduling schemes in wireless networks

    KAUST Repository

    Hossain, Md Jahangir

    2010-07-01

    In our earlier works, we proposed rate adaptive hierarchical modulation-assisted two-best user opportunistic scheduling (TBS) and hybrid two-user scheduling (HTS) schemes. The proposed schemes are innovative in the sense that they include a second user in the transmission opportunistically using hierarchical modulations. As such the frequency of information access of the users increases without any degradation of the system spectral efficiency (SSE) compared to the classical opportunistic scheduling scheme. In this paper, we analyze channel access delay of an incoming packet at the base station (BS) buffer when our proposed TBS and HTS schemes are employed at the BS. Specifically, using a queuing analytic model we derive channel access delay as well as buffer distribution of the packets that wait at BS buffer for down-link (DL) transmission. We compare performance of the TBS and HTS schemes with that of the classical single user opportunistic schemes namely, absolute carrier-to-noise ratio (CNR)-based single user scheduling (ASS) and normalized CNR-based single user scheduling (NSS). For an independent and identically distributed (i.i.d.) fading environment, our proposed scheme can improve packet\\'s access delay performance compared to the ASS. Selected numerical results in an independent but non-identically distributed (i.n.d.) fading environment show that our proposed HTS achieves overall good channel access delay performance. © 2010 IEEE.

  1. Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

    Science.gov (United States)

    Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki

    2014-01-01

    Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

  2. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  3. Economic and psychological burden of scheduled surgery ...

    African Journals Online (AJOL)

    Background: Cancellation of scheduled surgery creates a financial burden for hospitals, caregivers and patients. Cancellation ... management. High cancellation rates may indicate that rare health resources are being used ineffectively, thereby increasing costs. There are many reasons for surgery cancellation including.

  4. Dynamical model for retrieval of tram schedule

    Science.gov (United States)

    Nagatani, Takashi

    2007-04-01

    We present the dynamical model for retrieval of a tram schedule when trams arrive at stops slower or faster than the schedule. Trams speed up or stop shorter to retrieve the delay. The dynamics of the trams is expressed in terms of the nonlinear maps. We study the dynamical behavior of trams when they control the speed and stopping time to retrieve the schedule. The arrival times of trams exhibit the complex behavior with varying trips. The trams show the periodic and irregular (chaotic) motions even if there are no noises. The tram chaos is controlled by varying both stopping time and degree of speedup. The tram schedule is connected with the complex motions of trams. The region map (phase diagram) is shown to control the complex motions of trams.

  5. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  6. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  7. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  8. Strategic Gang Scheduling for Railroad Maintenance

    Science.gov (United States)

    2012-08-14

    We address the railway track maintenance scheduling problem. The problem stems from the : significant percentage of the annual budget invested by the railway industry for maintaining its railway : tracks. The process requires consideration of human r...

  9. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  10. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  11. Quantify Risk to Manage Cost and Schedule

    National Research Council Canada - National Science Library

    Raymond, Fred

    1999-01-01

    Too many projects suffer from unachievable budget and schedule goals, caused by unrealistic estimates and the failure to quantify and communicate the uncertainty of these estimates to managers and sponsoring executives...

  12. 40 CFR 52.626 - Compliance schedules.

    Science.gov (United States)

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The.... Source Location Regulation sections involved Date of adoption Nanakuli Paving & Rock Co., Ltd Molokai 8...

  13. Enhancements to highway construction scheduling expert system.

    Science.gov (United States)

    2015-05-01

    This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...

  14. Schedule of average annual equipment ownership expense

    Science.gov (United States)

    2003-03-06

    The "Schedule of Average Annual Equipment Ownership Expense" is designed for use on Force Account bills of Contractors performing work for the Illinois Department of Transportation and local government agencies who choose to adopt these rates. This s...

  15. Congruent Validity of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Harris, Thomas L.; Brown, Nina W.

    1979-01-01

    The validity of the Rathus Assertiveness Schedule (RAS) was investigated by correlating it with the six Class I scales of the California Psychological Inventory on a sample of undergraduate students. Results supported the validity of the RAS. (JKS)

  16. Onboard Autonomous Scheduling Intelligence System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  17. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  18. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  19. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    Science.gov (United States)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  20. Distributed Hybrid Scheduling in Multi-Cloud Networks using Conflict Graphs

    KAUST Repository

    Douik, Ahmed

    2017-09-07

    Recent studies on cloud-radio access networks assume either signal-level or scheduling-level coordination. This paper considers a hybrid coordinated scheme as a means to benefit from both policies. Consider the downlink of a multi-cloud radio access network, where each cloud is connected to several base-stations (BSs) via high capacity links, and, therefore, allows for joint signal processing within the cloud transmission. Across the multiple clouds, however, only scheduling-level coordination is permitted, as low levels of backhaul communication are feasible. The frame structure of every BS is composed of various time/frequency blocks, called power-zones (PZs), which are maintained at a fixed power level. The paper addresses the problem of maximizing a network-wide utility by associating users to clouds and scheduling them to the PZs, under the practical constraints that each user is scheduled to a single cloud at most, but possibly to many BSs within the cloud, and can be served by one or more distinct PZs within the BSs’ frame. The paper solves the problem using graph theory techniques by constructing the conflict graph. The considered scheduling problem is, then, shown to be equivalent to a maximum-weight independent set problem in the constructed graph, which can be solved using efficient techniques. The paper then proposes solving the problem using both optimal and heuristic algorithms that can be implemented in a distributed fashion across the network. The proposed distributed algorithms rely on the well-chosen structure of the constructed conflict graph utilized to solve the maximum-weight independent set problem. Simulation results suggest that the proposed optimal and heuristic hybrid scheduling strategies provide appreciable gain as compared to the scheduling-level coordinated networks, with a negligible degradation to signal-level coordination.

  1. Maximizing System Lifetime by Battery Scheduling

    OpenAIRE

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.; Bohnenkamp, H.C.; Katoen, Joost P.

    2009-01-01

    The use of mobile devices is limited by the battery lifetime. Some devices have the option to connect an extra battery, or to use smart battery-packs with multiple cells to extend the lifetime. In these cases, scheduling the batteries over the load to exploit recovery properties usually extends the system lifetime. Straightforward scheduling schemes, like round robin or choosing the best battery available, already provide a big improvement compared to a sequential discharge of the batteries. ...

  2. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  3. A Program Master Schedule Can Improve Results

    Science.gov (United States)

    2014-02-01

    briefings, so PMOs often rely on static pictures and Gantt charts available on presentation software such as Microsoft PowerPoint. That’s fine—and...dependencies, current status and individual forecasts to be overlaid and projected in a program context. Commercial scheduling software is...uniquely capable of doing this in re- peatable and reliable fashion. However, scheduling software doesn’t always produce the “pretty” pictures preferred for

  4. Drug discrimination under a concurrent schedule.

    OpenAIRE

    Snodgrass, S H; McMillan, D E

    1996-01-01

    Three pigeons were trained to discriminate a 5.0 mg/kg dose of pentobarbital from saline under a two-key concurrent schedule with responding on the key associated with the presession injection, under both stimulus conditions, producing four times as many reinforcers as responding on the other key. This concurrent schedule resulted in approximately 70% responding to the higher reinforcement key under the pentobarbital stimulus and approximately 30% responding to that key under the saline stimu...

  5. Cooperating expert systems for space station power distribution management

    International Nuclear Information System (INIS)

    Nguyen, T.A.; Chiou, W.C.

    1986-01-01

    In a complex system such as the manned Space Station, it is deemed necessary that many expert systems must perform tasks in a concurrent and cooperative manner. An important question to arise is: what cooperative-task-performing models are appropriate for multiple expert systems to jointly perform tasks. The solution to this question will provide a crucial automation design criteria for the Space Station complex systems architecture. Based on a client/server model for performing tasks, the authors have developed a system that acts as a front-end to support loosely-coupled communications between expert systems running on multiple Symbolics machines. As an example, they use the two ART*-based expert systems to demonstrate the concept of parallel symbolic manipulation for power distribution management and dynamic load planner/scheduler in the simulated Space Station environment. This on-going work will also explore other cooperative-task-performing models as alternatives which can evaluate inter and intra expert system communication mechanisms. It will serve as a testbed and a bench-marking tool for other Space Station expert subsystem communication and information exchange

  6. 47 CFR 97.109 - Station control.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Station control. 97.109 Section 97.109... SERVICE Station Operation Standards § 97.109 Station control. (a) Each amateur station must have at least one control point. (b) When a station is being locally controlled, the control operator must be at the...

  7. Torness: proposed nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The need for and desirability of nuclear power, and in particular the proposed nuclear power station at Torness in Scotland, are questioned. Questions are asked, and answered, on the following topics: position, appearance and cost of the proposed Torness plant, and whether necessary; present availability of electricity, and forecast of future needs, in Scotland; energy conservation and alternative energy sources; radiation hazards from nuclear power stations (outside, inside, and in case of an accident); transport of spent fuel from Torness to Windscale; radioactive waste management; possibility of terrorists making a bomb with radioactive fuel from a nuclear power station; cost of electricity from nuclear power; how to stop Torness. (U.K.)

  8. Space station neutral external environment

    Science.gov (United States)

    Ehlers, H.; Leger, L.

    1988-01-01

    Molecular contamination levels arising from the external induced neutral environment of the Space Station (Phase 1 configuration) were calculated using the MOLFLUX model. Predicted molecular column densities and deposition rates generally meet the Space Station contamination requirements. In the doubtful cases of deposition due to materials outgassing, proper material selection, generally excluding organic products exposed to the external environment, must be considered to meet contamination requirements. It is important that the Space Station configuration, once defined, is not significantly modified to avoid introducing new unacceptable contamination sources.

  9. Spiking Neural P Systems With Scheduled Synapses.

    Science.gov (United States)

    Cabarle, Francis George C; Adorna, Henry N; Jiang, Min; Zeng, Xiangxiang

    2017-12-01

    Spiking neural P systems (SN P systems) are models of computation inspired by biological spiking neurons. SN P systems have neurons as spike processors, which are placed on the nodes of a directed and static graph (the edges in the graph are the synapses). In this paper, we introduce a variant called SN P systems with scheduled synapses (SSN P systems). SSN P systems are inspired and motivated by the structural dynamism of biological synapses, while incorporating ideas from nonstatic (i.e., dynamic) graphs and networks. In particular, synapses in SSN P systems are available only at specific durations according to their schedules. The SSN P systems model is a response to the problem of introducing durations to synapses of SN P systems. Since SN P systems are in essence static graphs, it is natural to consider them for dynamic graphs also. We introduce local and global schedule types, also taking inspiration from the above-mentioned sources. We prove that SSN P systems are computationally universal as number generators and acceptors for both schedule types, under a normal form (i.e., a simplifying set of restrictions). The introduction of synapse schedules for either schedule type proves useful in programming the system, despite restrictions in the normal form.

  10. [The social hygiene problems in the operator work of hydroelectric power station workers and the means for enhancing work capacity].

    Science.gov (United States)

    Karakashian, A N; Lepeshkina, T R; Ratushnaia, A N; Glushchenko, S S; Zakharenko, M I; Lastovchenko, V B; Diordichuk, T I

    1993-01-01

    Weight, tension and harmfulness of professional activity, peculiarities of labour conditions and characteristics of work, shift dynamics of operative personnel's working capacity were studied in the course of 8-hour working day currently accepted at hydroelectric power stations (HEPS) and experimental 12-hour schedule. Working conditions classified as "admissible", positive dynamics of operators' state, their social and material contentment were a basis for 12-hour two-shift schedule to be recommended as more appropriate. At the same time, problem of optimal shift schedules for operative personnel of HEPS remains unsolved and needs to be further explored.

  11. VT Data - Electric Charging Stations

    Data.gov (United States)

    Vermont Center for Geographic Information — Locations of Electric Charging Stations provided by the NREL national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy....

  12. Services for nuclear power stations

    International Nuclear Information System (INIS)

    Fremann, M.; Ryckelynck

    1987-01-01

    This article gives an information as complete as possible about the activities of the french nuclear industry on the export-market. It describes the equipment and services available in the field of services for nuclear power stations [fr

  13. Gravity Station Data for Portugal

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The gravity station data total 3064 records. This data base was received in April 1997. Principal gravity parameters include Free-air Anomalies which have been...

  14. Gravity Station Data for Spain

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The gravity station data total 28493 records. This data base was received in April 1997. Principal gravity parameters include Free-air Anomalies which have been...

  15. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  16. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  17. Space Station Human Factors Research Review. Volume 3: Space Station Habitability and Function: Architectural Research

    Science.gov (United States)

    Cohen, Marc M. (Editor); Eichold, Alice (Editor); Heers, Susan (Editor)

    1987-01-01

    Articles are presented on a space station architectural elements model study, space station group activities habitability module study, full-scale architectural simulation techniques for space stations, and social factors in space station interiors.

  18. Space stations systems and utilization

    CERN Document Server

    Messerschmid, Ernst

    1999-01-01

    The design of space stations like the recently launched ISS is a highly complex and interdisciplinary task. This book describes component technologies, system integration, and the potential usage of space stations in general and of the ISS in particular. It so adresses students and engineers in space technology. Ernst Messerschmid holds the chair of space systems at the University of Stuttgart and was one of the first German astronauts.

  19. Internationalization of the Space Station

    Science.gov (United States)

    Lottmann, R. V.

    1985-01-01

    Attention is given to the NASA Space Station system elements whose production is under consideration by potential foreign partners. The ESA's Columbus Program declaration encompasses studies of pressurized modules, unmanned payload carriers, and ground support facilities. Canada has expressed interest in construction and servicing facilities, solar arrays, and remote sensing facilities. Japanese studies concern a multipurpose experimental module concept. Each of these foreign investments would expand Space Station capabilities and lay the groundwork for long term partnerships.

  20. 46 CFR 28.395 - Embarkation stations.

    Science.gov (United States)

    2010-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY UNINSPECTED VESSELS REQUIREMENTS FOR COMMERCIAL FISHING... least one designated survival craft embarkation station and any additional embarkation stations.... Each embarkation station must be arranged to allow the safe boarding of survival craft. ...

  1. Non-Coop Station History (Unindexed)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Station history documentation for stations outside the US Cooperative Observer network. Documents should be compared with those in the Non-Coop Station History...

  2. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  3. 47 CFR 73.6016 - Digital Class A TV station protection of TV broadcast stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital Class A TV station protection of TV... Class A TV station protection of TV broadcast stations. Digital Class A TV stations must protect authorized TV broadcast stations, applications for minor changes in authorized TV broadcast stations filed on...

  4. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  5. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  6. Empirical results on scheduling and dynamic backtracking

    Science.gov (United States)

    Boddy, Mark S.; Goldman, Robert P.

    1994-01-01

    At the Honeywell Technology Center (HTC), we have been working on a scheduling problem related to commercial avionics. This application is large, complex, and hard to solve. To be a little more concrete: 'large' means almost 20,000 activities, 'complex' means several activity types, periodic behavior, and assorted types of temporal constraints, and 'hard to solve' means that we have been unable to eliminate backtracking through the use of search heuristics. At this point, we can generate solutions, where solutions exist, or report failure and sometimes why the system failed. To the best of our knowledge, this is among the largest and most complex scheduling problems to have been solved as a constraint satisfaction problem, at least that has appeared in the published literature. This abstract is a preliminary report on what we have done and how. In the next section, we present our approach to treating scheduling as a constraint satisfaction problem. The following sections present the application in more detail and describe how we solve scheduling problems in the application domain. The implemented system makes use of Ginsberg's Dynamic Backtracking algorithm, with some minor extensions to improve its utility for scheduling. We describe those extensions and the performance of the resulting system. The paper concludes with some general remarks, open questions and plans for future work.

  7. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  8. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  9. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  10. Pumped energy transfer stations (STEP)

    International Nuclear Information System (INIS)

    Tournery, Jean-Francois

    2015-12-01

    As objectives of development are high for renewable energies (they are supposed to cover 50 per cent of new energy needs by 2035), pumped energy transfer stations are to play an important role in this respect. The author first discusses the consequences of the development of renewable energies on the exploitation of electric grids: issue of intermittency for some of them, envisaged solutions. Then, he addresses one of the solutions: the storage of electric power. He notices that increasing the potential energy of a volume of water is presently the most mature solution to face massive needs of the power system. Dams and pumped energy transfer stations represent now almost the whole installed storage power in the world. The author then presents these pumped energy transfer stations: principle, brief history (the first appeared in Italy and Switzerland at the end of the 1890's). He indicates the various parameters of assessment of such stations: maximum stored energy, installed power in pumping mode and turbine mode, time constant, efficiency, level of flexibility. He discusses economic issues. He describes and comments the operation of turbine-pump groups: ternary groups, reversible binary groups. He discusses barriers to be overcome and technical advances to be made for varying speed groups and for marine stations. He finally gives an overview (table with number of stations belonging to different power ranges, remarkable installations) of existing stations in China, USA, Japan, Germany, Austria, Spain, Portugal, Italy, Switzerland, France and UK, and indicate predictions regarding storage needs at the world level. Some data are finally indicated for the six existing French installations

  11. Definition of technology development missions for early Space Station satellite servicing. Volume 1: Executive summary

    Science.gov (United States)

    1984-01-01

    The Executive Summary volume 1, includes an overview of both phases of the Definition of Technology Development Missions for Early Space Station Satellite Servicing. The primary purpose of Phase 1 of the Marshall Space Flight Center (MSFC) Satellite Servicing Phase 1 study was to establish requirements for demonstrating the capability of performing satellite servicing activities on a permanently manned Space Station in the early 1990s. The scope of Phase 1 included TDM definition, outlining of servicing objectives, derivation of initial Space Station servicing support requirements, and generation of the associated programmatic schedules and cost. The purpose of phase 2 of the satellite servicing study was to expand and refine the overall understanding of how best to use the manned space station as a test bed for demonstration of satellite servicing capabilities.

  12. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    Science.gov (United States)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  13. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  14. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  15. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  16. The Probability of Small Schedule Values and Preference for Random-Interval Schedules

    Science.gov (United States)

    Soreth, Michelle Ennis; Hineline, Philip N.

    2009-01-01

    Preference for working on variable schedules and temporal discrimination were simultaneously examined in two experiments using a discrete-trial, concurrent-chains arrangement with fixed interval (FI) and random interval (RI) terminal links. The random schedule was generated by first sampling a probability distribution after the programmed delay to…

  17. 76 FR 77895 - Schedules of Controlled Substances: Placement of Ezogabine Into Schedule V

    Science.gov (United States)

    2011-12-15

    ... medical use, and the degree of dependence the substance may cause, 21 U.S.C. 812. The initial schedules of... with this finding of conditions of public health and of good cause to waive the 30 day period and... of Schedule IV substances such as alprazolam can range from mild dysphoria and insomnia to a major...

  18. Hybrid Scheduling/Signal-Level Coordination in the Downlink of Multi-Cloud Radio-Access Networks

    KAUST Repository

    Douik, Ahmed

    2016-03-28

    In the context of resource allocation in cloud- radio access networks, recent studies assume either signal-level or scheduling-level coordination. This paper, instead, considers a hybrid level of coordination for the scheduling problem in the downlink of a multi-cloud radio- access network, so as to benefit from both scheduling policies. Consider a multi-cloud radio access network, where each cloud is connected to several base-stations (BSs) via high capacity links, and therefore allows joint signal processing between them. Across the multiple clouds, however, only scheduling-level coordination is permitted, as it requires a lower level of backhaul communication. The frame structure of every BS is composed of various time/frequency blocks, called power- zones (PZs), and kept at fixed power level. The paper addresses the problem of maximizing a network-wide utility by associating users to clouds and scheduling them to the PZs, under the practical constraints that each user is scheduled, at most, to a single cloud, but possibly to many BSs within the cloud, and can be served by one or more distinct PZs within the BSs\\' frame. The paper solves the problem using graph theory techniques by constructing the conflict graph. The scheduling problem is, then, shown to be equivalent to a maximum- weight independent set problem in the constructed graph, in which each vertex symbolizes an association of cloud, user, BS and PZ, with a weight representing the utility of that association. Simulation results suggest that the proposed hybrid scheduling strategy provides appreciable gain as compared to the scheduling-level coordinated networks, with a negligible degradation to signal-level coordination.

  19. System for a displaying at a remote station data generated at a central station and for powering the remote station from the central station

    Science.gov (United States)

    Perry, J. C. (Inventor)

    1980-01-01

    A system for displaying at a remote station data generated at a central station and for powering the remote station from the central station is presented. A power signal is generated at the central station and time multiplexed with the data and then transmitted to the remote station. An energy storage device at the remote station is responsive to the transmitted power signal to provide energizing power for the circuits at the remote station during the time interval data is being transmitted to the remote station. Energizing power for the circuits at the remote station is provided by the power signal itself during the time this signal is transmitted. Preferably the energy storage device is a capacitor which is charged by the power signal during the time the power is transmitted and is slightly discharged during the time the data is transmitted to energize the circuits at the remote station.

  20. Integrated scheduled waste management system in Kuala Lumpur ...

    African Journals Online (AJOL)

    GREGORY

    2011-12-16

    Dec 16, 2011 ... requirements, packaging requirements, impact of scheduled wastes, recycling of scheduled wastes and recommendations. Besides ... specifically excludes municipal solid waste and municipal sewage. Scheduled wastes are ... scheduled waste generated in Kuala Lumpur (KL) and service provided for ...

  1. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    This paper proposes a topology-based hierarchical scheduling scheme using Deficit Round Robin (DRR). The main idea of the topology-based hierarchical scheduling is to map the topology of the connected network into the logical structure of the scheduler, and combine several token schedulers accord...... of malicious traffic. This is significant for IPTV services in Carrier Ethernet networks....

  2. A Priority-Based Budget Scheduler with Conservative Dataflow Model

    NARCIS (Netherlands)

    Steine, Marcel; Bekooij, Marco Jan Gerrit; Wiggers, M.H.

    2009-01-01

    Currently, the guaranteed throughput of a stream processing application, mapped on a multi-processor system, can be computed with a conservative dataflow model, if only time division multiplex (TDM) schedulers are applied. A TDM scheduler is a budget scheduler. Budget schedulers can be characterized

  3. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    -Wolfe decomposition is presented. The pricing problem is the linear multicommodity flow problem defined on a time-space network. Branching strategies are presented for the branchand-price algorithm and three heuristics and an exact solution method are implemented for finding a feasible start solution. Finally......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  4. A scheduling algorithm based on Clara clustering

    Science.gov (United States)

    Kuang, Ling; Zhang, Lichen

    2017-08-01

    Task scheduling is a key issue in cloud computing. A new algorithm for queuing task scheduling based on Clara clustering and SJF cloud computing is proposed to introduce the Clara clustering for the shortcomings of SJF algorithm load imbalance. The Clara clustering method prepares the task clustering based on the task execution time and the waiting time of the task, and then divides the task into three groups according to the reference point obtained by the clustering. Based on the number of tasks per group in the proportion of the total number of tasks assigned to the implementation of the quota. Each queue team will perform task scheduling based on these quotas and SJF. The simulation results show that the algorithm has good load balancing and system performance.

  5. Effects of 4X4 Block Scheduling

    Directory of Open Access Journals (Sweden)

    R. Brian Cobb

    1999-02-01

    Full Text Available The effects of a 4 X 4 block scheduling program in a middle school on a variety of student measures were investigated. These measures included standardized achievement tests in mathematics, reading, and writing, cumulative and semester grades in middle school and high school, attendance rates, and enrollment rates in advanced high school courses (in mathematics only. The block scheduling program had been in effect for four years allowing analyses of current middle and high school students who had experienced a minimum of one and one-half years of block scheduling while in middle school. The primary research design was a post-test only, matched pairs design. Students were matched on school characteristics, gender, ethnicity, grade level, and 5th grade standardized reading scores. Results were relatively consistent with the extant literature and generally positive.

  6. Program cost and schedule baseline; Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-11-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of the Radioactive Waste Management Program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive Level (Level 0) and Program (Level 1) Change Control Boards (CCBs) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD) and the Waste Management System Requirements (WMSR) documents provides the technical basis for the PCSB. The PCSB establishes baseline values for the Yucca Mountain Site Characterization Project cost and schedule through submittal of the license application to the Nuclear Regulatory Commission (NRC).

  7. Shippingport Station decommissioning project overview

    International Nuclear Information System (INIS)

    Schreiber, J.J.

    1985-01-01

    The U.S. Department of Energy is in the process of decommissioning the Shippingport Atomic Power Station located on the Ohio River, 30 miles northwest of Pittsburgh, Pennsylvania. The Shippingport Station is the first commercial size nuclear power plant to undergo decommissioning in the United Staes. The plant is located on approximately 7 acres of land owned by the Duquesne Light Company (DLC) and leased to the U.S. Government. DLC operates two nuclear power plants, Beaver Valley 1 and 2, located immediately adjacent to the site and the Bruce Mansfield coal-fired power plant is also within the immediate area. The Station was shutdown in October, 1982. Defueling operations began in 1983 and were completed by September, 1984. The Shippingport Station consists of a 275' x 60' fuel handling building containing the reactor containment chamber, the service building, the turbine building, the radioactive waste processing building, the administration building and other smaller support buildings. The Station has four coolant loops and most of the containment structures are located below grade. Structures owned by the U.S. Government including the fuel handling building, service building, contaminated equipment room, the boiler chambers, the radioactive waste processing building and the decontamination and laydown buildings will be dismantled and removed to 3 feet below grade. The area will then be filled with clean soil and graded. The turbine building, testing and training building and the administration building are owned by DLC and will remain

  8. Nursing teamwork, staff characteristics, work schedules, and staffing.

    Science.gov (United States)

    Kalisch, Beatrice J; Lee, Hyunhwa

    2009-01-01

    This study aimed to explore whether and how staff characteristics, staffing, and scheduling variables are associated with the level of teamwork in nursing staff on acute care hospital patient units. This was a cross-sectional study with a sample of 1,758 nursing staff members from two different hospitals on 38 patient care units who completed the Nursing Teamwork Survey in 2008. This study focused on nursing teams who are stationed on a particular patient care unit (as opposed to visitors to the units). The return rate was 56.9%. The sample was made up of 77.4% nurses (registered nurses and licensed practical nurses), 11.9% assistive personnel, and 7.9% unit secretaries. Teamwork varied by unit and service type, with the highest scores occurring in pediatrics and maternity and the lowest scores on the medical-surgical and emergency units. Staff with less than 6 months of experience, those working 8- or 10-hour shifts (as opposed to 12 hours or a combination of 8 and 12 hours), part-time staff (as opposed to full time), and those working on night shift had higher teamwork scores. The higher teamwork scores were also associated with no or little overtime. The higher perception of the adequacy of staffing and the fewer patients cared for on a previous shift, the higher the teamwork scores. There is a relationship between selected staff characteristics, aspects of work schedules, staffing, and teamwork. Nursing staff want to work where teamwork is high, and perceptions of good staffing lead to higher teamwork. Higher teamwork scores correlated with those who worked less overtime.

  9. S-CHART - SCHEDULING CHART PROGRAM

    Science.gov (United States)

    Klinkner, E. R.

    1994-01-01

    The Scheduling Chart Program (S-Chart) uses simple menu choices to produce high quality Gantt type scheduling and production time-line charts with minimal data entry requirements. The software produces high quality charts (20, 40, and 80 day options) in 10-20 minutes including start up, data entry, and printing. Reprints take less than one minute. Some of the more significant features are as follows: speed and ease of use with menu driven selections from start to finish, storage and catalogs of all data sets for rapid access and manipulation, compact program size to permit storage of dozens of data sets on the program disc, and creation of ASCII text files of graphs for rapid printing. The final product of the plot routine is an extended ASCII character file which shows the events scheduled and actual work dates. This file may be printed from the program, from DOS, or imported to a word processor for customizing. S-Chart is not intended to take the place of commercial scheduling/project management software. However, it is a simple, somewhat limited Gantt chart plotter and scheduling tracking program with an emphasis on straightforward data entry. There is no complex relationship building between the scheduled events. Dates are entered as dates, not as algebraic functions. All the files of S-Chart, except for the graph picture and the stand-alone executable, were written in 100% dBASE III compatible code. The executable code was created with CLIPPER and the graph picture files are written in ASCII code. S-Chart was implemented on an IBM PC series machine under DOS and requires 215k bytes of memory. The program was developed in 1988.

  10. A heuristic approach to incremental and reactive scheduling

    Science.gov (United States)

    Odubiyi, Jide B.; Zoch, David R.

    1989-01-01

    An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.

  11. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  12. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  13. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  14. Crane Scheduling for a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper; Clausen, Jens

    2002-01-01

    Odense Steel Shipyard produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. This paper considers the problem of scheduling two cranes that carry out the movements of plates...... into, around and out of the storage. The system is required to create a daily schedule for the cranes, but also handle possible disruptions during the execution of the plan. The problem is solved with a Simulated Annealing algorithm....

  15. Anesthesiology Nurse Scheduling using Particle Swarm Optimization

    Directory of Open Access Journals (Sweden)

    Leopoldo Altamirano

    2012-02-01

    Full Text Available In this article we present an approach designed to solve a real world problem: the Anesthesiology Nurse Scheduling Problem (ANSP at a public French hospital. The anesthesiology nurses are one of the most shared resources in the hospital and we attempt to find a fair/balanced schedule for them, taking into account a set of constraints and the nursesarsquo; stated preferences, concerning the different shifts. We propose a particle swarm optimization algorithm to solve the ANSP. Finally, we compare our technique with previous results obtained using integer programming.

  16. Solar panels for the International Space Station are uncrated and moved in the SSPF

    Science.gov (United States)

    1998-01-01

    In the Space Station Processing Facility, the overhead crane slowly moves solar panels intended for the International Space Station (ISS). The panels are the first set of U.S.-provided solar arrays and batteries for ISS, scheduled to be part of mission STS-97 in December 1999. The mission, fifth in the U.S. flights for construction of ISS, will build and enhance the capabilities of the Space Station. It will deliver the solar panels as well as radiators to provide cooling. The Shuttle will spend 5 days docked to the station, which at that time will be staffed by the first station crew. Two space walks will be conducted to complete assembly operations while the arrays are attached and unfurled. A communications system for voice and telemetry also will be installed. At the left of the crane and panels is the Multipurpose Logistics Module (MPLM), the Leonardo A reusable logistics carrier, the MPLM is scheduled to be launched on Space Shuttle Mission STS-100, targeted for April 2000.

  17. Reviewing nuclear power station achievement

    International Nuclear Information System (INIS)

    Howles, L.R.

    1976-01-01

    For measurement of nuclear power station achievement against original purchase the usual gross output figures are of little value since the term loosely covers many different definitions. An authentically designed output figure has been established which relates to net design output plus house load at full load. Based on these figures both cumulative and moving annual load factors are measured, the latter measuring the achievement over the last year, thus showing trends with time. Calculations have been carried out for all nuclear stations in the Western World with 150 MW(e) gross design output and above. From these are shown: moving annual load factor indicating relative station achievements for all the plants; cumulative load factors from which return of investment can be calculated; average moving annual load factors for the four types of system Magnox, PWR, HWR, and BWR; and a relative comparison of achievement by country in a few cases. (U.K.)

  18. Monitoring of nuclear power stations

    International Nuclear Information System (INIS)

    Ull, E.; Labudda, H.J.

    1987-01-01

    The purpose of the invention is to create a process for undelayed automated detection and monitoring of accidents in the operation of nuclear power stations. According to the invention, this problem is solved by the relevant local measurements, such as radiation dose, components and type of radiation and additional relevant meteorological parameters being collected by means of wellknown data collection platforms, these being transmitted via transmission channels by means of satellites to suitable worldwide situated receiving stations on the ground, being processed there and being evaluated to recognise accidents. The local data collection platforms are used in the immediate vicinity of the nuclear power station. The use of aircraft, ships and balloons as data collection systems is also intended. (HWJ)

  19. Group Elevator Peak Scheduling Based on Robust Optimization Model

    OpenAIRE

    ZHANG, J.; ZONG, Q.

    2013-01-01

    Scheduling of Elevator Group Control System (EGCS) is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization) method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is re...

  20. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  1. Definition of technology development missions for early space station satellite servicing, volume 2

    Science.gov (United States)

    1983-01-01

    The results of all aspects of the early space station satellite servicing study tasks are presented. These results include identification of servicing tasks (and locations), identification of servicing mission system and detailed objectives, functional/operational requirements analyses of multiple servicing scenarios, assessment of critical servicing technology capabilities and development of an evolutionary capability plan, design and validation of selected servicing technology development missions (TDMs), identification of space station satellite servicing accommodation needs, and the cost and schedule implications of acquiring both required technology capability development and conducting the selected TDMs.

  2. Definition of technology development missions for early Space Station satellite servicing. Volume 2: Technical

    Science.gov (United States)

    Cable, D. A.; Diewald, C. A.; Hills, T. C.; Parmentier, T. J.; Spencer, R. A.; Stone, G. E.

    1984-01-01

    Volume 2 contains the Technical Report of the approach and results of the Phase 2 study. The phase 2 servicing study was initiated in June 1983, and is being reported in this document. The scope of the contract was to: (1) define in detail five selected technology development missions (TDM); (2) conduct a design requirement analysis to refine definitions of satellite servicing requirements at the space station; and (3) develop a technology plan that would identify and schedule prerequisite precursor technology development, associated. STS flight experiments and space station experiments needed to provide onorbit validation of the evolving technology.

  3. Definition of technology development missions for early space stations: Large space structures

    Science.gov (United States)

    Gates, R. M.; Reid, G.

    1984-01-01

    The objectives studied are the definition of the tested role of an early Space Station for the construction of large space structures. This is accomplished by defining the LSS technology development missions (TDMs) identified in phase 1. Design and operations trade studies are used to identify the best structural concepts and procedures for each TDMs. Details of the TDM designs are then developed along with their operational requirements. Space Station resources required for each mission, both human and physical, are identified. The costs and development schedules for the TDMs provide an indication of the programs needed to develop these missions.

  4. 47 CFR 73.1820 - Station log.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Station log. 73.1820 Section 73.1820... Rules Applicable to All Broadcast Stations § 73.1820 Station log. (a) Entries must be made in the station log either manually by a person designated by the licensee who is in actual charge of the...

  5. 47 CFR 73.1120 - Station location.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Station location. 73.1120 Section 73.1120... Rules Applicable to All Broadcast Stations § 73.1120 Station location. Each AM, FM, TV and Class A TV... be the geographical station location. ...

  6. Fairness Consideration of Scheduling for Real-Time Services in 4G Systems

    Directory of Open Access Journals (Sweden)

    Woei-Hwa Tarn

    2015-01-01

    Full Text Available In order to achieve higher resource utilization, the call admission control (CAC will allow the number of connections into the system more than the system capacity can offer. However, the fairness problem will occur when these connections are real-time services. To solve this problem, in this paper, we propose a fair scheduling algorithm named contribution-based scheduling algorithm (CSA for real-time polling service (rtPS or guarantee bit rate (GBR in the uplink direction in the forth-generation (4G systems. In CSA, a mobile subscriber (MS gains its contribution credit value at the end of each transmission time interval (TTI, which is based on the contribution of MS to the radio resource scheduling. The base station (BS schedules the bandwidth according to the credit value. Simulation results show that CSA achieves higher fairness in bandwidth allocation while connection drop rate and queuing delay are also guaranteed as compared to the roundrobin (RR and early deadline first (EDF mechanisms.

  7. SCHEDULING AND SIMULATION OF VLBI MEASUREMETS FOR THE DETERMINATION OF EARTH ORIENTATION PARAMETERS

    Directory of Open Access Journals (Sweden)

    Nistor S.

    2015-05-01

    Full Text Available The article aims to present the results obtain from the scheduling and simulation of VLBI measurements in October 2010 for a period of three days for 24 hour continuous observations. To be sure that we will obtain good VLBI observation we have to do an optimization of the network. This can be done quite accurately by using the new modules that are part of the VLBI processing software’s, the modules scheduling and simulation. This can be considered the first step in preparation of the VLBI experiment. Very Long Baseline Interferometry (VLBI it is a primary space-geodetic technique that it is able to determine precise coordinates on the Earth, by monitoring the variable of Earth orientation parameters (EOP with high precision. Also Very Long Baseline Interferometry plays an important role for determination of celestial and terrestrial reference frame. It is also a technique that each year is more developed form a software and hardware point of view. To obtain the scans we used a set of eight different VLBI antennas and as a source we used different quasars. In the scheduling we used the source based strategy contrary to the station based approach and the radio sources where from updated catalogues according to the requirements of the VLBI2010 system, which means that we are able to obtain a best coverage of the celestial sphere. The results show that scheduling and simulation are very good tools in preparing real VLBI experiments.

  8. Path Planning and Vehicle Scheduling Optimization for Logistic Distribution of Hazardous Materials in Full Container Load

    Directory of Open Access Journals (Sweden)

    Huo Chai

    2017-01-01

    Full Text Available Mathematical models for path planning and vehicle scheduling for logistic distribution of hazardous materials in full container load (FCL are established, with their problem-solving methods proposed. First, a two-stage multiobjective optimization algorithm is designed for path planning. In the first stage, pulse algorithm is used to obtain the Pareto paths from the distribution center to each destination. In the second stage, a multiobjective optimization method based on Nondominated Sorting Genetic Algorithm II (NSGA-II is designed to obtain candidate transport paths. Second, with analysis on the operating process of vehicles with hazardous materials in FCL, the vehicle scheduling problem is converted to Vehicle Routing Problem with Time Windows (VRPTW. A problem-solving method based on estimation of distribution is adopted. A transport timetable for all vehicles based on their transport paths is calculated, with participation of the decision-makers. A visual vehicle scheduling plan is presented for the decision-makers. Last, two examples are used to test the method proposed in this study: distribution of hazardous materials in a small-scale test network and distribution of oil products for sixteen gas stations in the main districts of Lanzhou city. In both examples, our method is used to obtain the path selection and vehicle scheduling plan, proving that validity of our method is verified.

  9. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning/scheduli....../scheduling solution approach to the problem.......This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  10. Evolutionary approaches for scheduling a flexible manufacturing system with automated guided vehicles and robots

    Directory of Open Access Journals (Sweden)

    Ramaraj Natarajan

    2012-08-01

    Full Text Available This paper addresses the scheduling of machines, an Automated Guided Vehicle (AGV and two robots in a Flexible Manufacturing System (FMS formed in three loop layouts, with objectives to minimize the makespan, mean flow time and mean tardiness. The scheduling optimization is carried out using Sheep Flock Heredity Algorithm (SFHA and Artificial Immune System (AIS algorithm. AGV is used for carrying jobs between the Load/Unload station and the machines. The robots are used for loading and unloading the jobs in the machines, and also used for transferring jobs between the machines. The algorithms are applied for test problems taken from the literature and the results obtained using the two algorithms are compared. The results indicate that SFHA performs better than AIS for this problem.

  11. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  12. Adaptive resource allocation for efficient patient scheduling

    NARCIS (Netherlands)

    Vermeulen, Ivan B.; Bohte, Sander M.; Elkhuizen, Sylvia G.; Lameris, Han; Bakker, Piet J. M.; La Poutré, Han

    2009-01-01

    Efficient scheduling of patient appointments on expensive resources is a complex and dynamic task. A resource is typically used by several patient groups. To service these groups, resource capacity is often allocated per group, explicitly or implicitly. Importantly, due to fluctuations in demand,

  13. FLOWSHOP SCHEDULING USING A NETWORK APPROACH ...

    African Journals Online (AJOL)

    eobe

    problems considered were solved using LINGO 7.0. The present technique has been shown to be very effective and efficient efficient. Keywords: Flow shop, network, linear programming, makespan, Gantt Chart, LINGO. 1. INTRODUCTION. INTRODUCTION. INTRODUCTION. The traditional flow shop scheduling problem, in.

  14. Scheduling irrigation in heterogeneous container nursery crops

    NARCIS (Netherlands)

    Incrocci, L.; Incrocci, G.; Vita, Di A.; Pardossi, A.; Bibbiani, C.; Marzialetti, P.; Balendonck, J.

    2014-01-01

    One of the major production areas in Europe for Hardy Ornamental Nursery Stocks (HONS) is located around Pistoia (Tuscany, Italy). In this area, pot ornamental crops show low water use efficiency (WUE). Main reasons of poor irrigation efficiency are both the inaccurate irrigation scheduling, which

  15. Integrating job scheduling and constrained network routing

    DEFF Research Database (Denmark)

    Gamst, Mette

    2010-01-01

    This paper examines the NP-hard problem of scheduling jobs on resources such that the overall profit of executed jobs is maximized. Job demand must be sent through a constrained network to the resource before execution can begin. The problem has application in grid computing, where a number...

  16. LTE uplink scheduling - Flow level analysis

    NARCIS (Netherlands)

    Dimitrova, D.C.; Berg, J.L. van den; Heijenk, G.; Litjens, R.

    2011-01-01

    Long Term Evolution (LTE) is a cellular technology foreseen to extend the capacity and improve the performance of current 3G cellular networks. A key mechanism in the LTE traffic handling is the packet scheduler, which is in charge of allocating resources to active flows in both the frequency and

  17. Physician Fee Schedule National Payment Amount File

    Data.gov (United States)

    U.S. Department of Health & Human Services — The significant size of the Physician Fee Schedule Payment Amount File-National requires that database programs (e.g., Access, dBase, FoxPro, etc.) be used to read...

  18. 76 FR 33181 - Regulatory Review Schedule

    Science.gov (United States)

    2011-06-08

    ...'s regulatory review process establishes a detailed tribal consultation schedule with a description... 66 Casino 1, 2, 3, 4, 5 Southwest. Hotel, Albuquerque, NM. July 28-29, 2011 NIGC Consultation-- DOI..., 3, 4, 5 Southwest. Casino, Scottsdale, AZ. Sept. 7-8, 2011 NIGC Consultation--United Radisson Hotel...

  19. 76 FR 54408 - Regulatory Review Schedule

    Science.gov (United States)

    2011-09-01

    ... established a tribal consultation schedule with a description of the regulation groups to be covered during... Quapaw Casino Miami, OK.. 5 December 8-9, 2011 NIGC Consultation Turtle Creek Casino & 5 Hotel... Rock Casino 3 Resort, Albuquerque, NM. February 7-8, 2012 NIGC Consultation Radisson Hotel Rapid 3 City...

  20. 76 FR 10233 - Schedule of Water Charges

    Science.gov (United States)

    2011-02-24

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River..., Part III, Basin Regulations--Water Supply Charges. Accordingly, the Commission's water charging rates..., 2011. Effective Date: February 24, 2011. FOR FURTHER INFORMATION CONTACT: For questions about the water...

  1. Scheduling drayage operations in synchromodal transport

    NARCIS (Netherlands)

    Rivera, Arturo E.Pérez; Mes, Martijn R.K.; Bektas, Tolga; Coniglio, Stefano; Martinez-Sykora, Antonio; Voss, Stefan

    2017-01-01

    We study the problem of scheduling drayage operations in synchromodal transport. Besides the usual decisions to time the pick-up and delivery of containers, and to route the vehicles that transport them, synchromodal transport includes the assignment of terminals for empty and loaded containers. The

  2. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...

  3. Direct block scheduling technology: Analysis of Avidity

    Directory of Open Access Journals (Sweden)

    Felipe Ribeiro Souza

    Full Text Available Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the classical methodology derived from Lerchs-Grossmann's initial proposition improved by Whittle. This paper presents the differences between these methodologies, specially focused on the algorithms' avidity. Avidity is classically defined by the voracious search algorithms, whereupon some of the most famous greedy algorithms are Branch and Bound, Brutal Force and Randomized. Strategies based on heuristics can accentuate the voracity of the optimizer system. The applied algorithm use simulated annealing combined with Tabu Search. The most avid algorithm can select the most profitable blocks in early periods, leading to higher present value in the first periods of mine operation. The application of discount factors to blocks on the Lerchs-Grossmann's final pit has an accentuated effect with time, and this effect may make blocks scheduled for the end of the mine life unfeasible, representing a trend to a decrease in reported reserves.

  4. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  5. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    implementation cost if no breakdown occurs. The method is compared to a state of the art method for stochastic scheduling and concluded to have the same level of performance, but a wider area of applicability. The current implementation of the method is based on an evolutionary algorithm, but since the real...

  6. HEURISTIC SCHEDULING IN A NIGERIA FURNITURE SHOP

    African Journals Online (AJOL)

    NIJOTECH

    heuristic scheduling Job Shop situations. The furniture shop ... The job flow diagram is schematically presented in figure. 1. Not every order needs processing in all work centres. If a Job does not require shaping then the processing time of .... Anude. 31. Figure 3: Variation of MINF with decreasing shop load for the four rules ...

  7. Scheduling support for transactional memory contention management

    DEFF Research Database (Denmark)

    Maldonado, Walther; Marler, Patrick; Felber, Pascal

    2010-01-01

    different strategies for efficient communication between the kernel and the user-level TM library. To the best of our knowledge, our work is the first to investigate kernel-level support for TM contention management. We have introduced kernel-level TM scheduling support into both the Linux and Solaris...

  8. 15 CFR 700.14 - Preferential scheduling.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Preferential scheduling. 700.14 Section 700.14 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS...

  9. Randomized online scheduling on two uniform machines

    NARCIS (Netherlands)

    Epstein, Leah; Noga, John; Seiden, Steve S.; Sgall, Jirí; Woeginger, Gerhard

    2001-01-01

    We study the problem of on-line scheduling on two uniform machines with speeds 1 and s⩾1. A ϕ≈1.61803 competitive deterministic algorithm was already known. We present the first randomized results for this problem: We show that randomization does not help for speeds s⩾2, but does help for all s<2.

  10. Activity Schedule And Anticipation Training As Counselling ...

    African Journals Online (AJOL)

    This study investigated the impact of Activity Schedule and Anticipation Training as counselling strategies in managing mild depression among Nigerian adolescents. Six Senior Secondary Schools were randomly selected from three Education Districts in Lagos State. The total population of SS 2 students available for the ...

  11. 76 FR 57683 - Regulatory Review Schedule

    Science.gov (United States)

    2011-09-16

    ... location for the Tribal consultation scheduled for November 14-15, 2011 at the Spa Resort Casino, Palms... Primary Management Officials and Key Employees; (b) Part 558--Gaming Licenses for Key Employees and Primary Management Officials; (c) Part 571--Monitoring and Investigations; (d) Part 531--Collateral...

  12. Scheduling with Automatic Resolution of Conflicts

    Science.gov (United States)

    Clement, Bradley; Schaffer, Steve

    2006-01-01

    DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

  13. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  14. Proportional green time scheduling for traffic lights

    NARCIS (Netherlands)

    P. Kovacs; Le, T. (Tung); R. Núñez Queija (Rudesindo); Vu, H. (Hai); N. Walton

    2016-01-01

    textabstractWe consider the decentralized scheduling of a large number of urban traffic lights. We investigate factors determining system performance, in particular, the length of the traffic light cycle and the proportion of green time allocated to each junction. We study the effect of the length

  15. Multimodal Plan Representation for Adaptable BML Scheduling

    NARCIS (Netherlands)

    Reidsma, Dennis; van Welbergen, H.; Zwiers, Jakob; Vilhjálmsson, Hannes Högni; Kopp, Stefan; Marsella, Stacy; Thórisson, Kristinn R.

    In this paper we show how behavior scheduling for Virtual Humans can be viewed as a constraint optimization problem, and how Elckerlyc uses this view to maintain a extensible behavior plan representation that allows one to make micro-adjustments to behaviors while keeping constraints between them

  16. LTE uplink scheduling - flow level analysis

    NARCIS (Netherlands)

    Dimitrova, D.C.; van den Berg, J.L.; Heijenk, G.; Litjens, R.; Sacchi, Claudio; Bellalta, Boris; Vinel, Alexey; Schlegel, Christian; Granelli, Fabrizio; Zhang, Yan

    Long Term Evolution (LTE) is a cellular technology foreseen to extend the capacity and improve the performance of current 3G cellular networks. A key mechanism in the LTE traffic handling is the packet scheduler, which is in charge of allocating resources to active flows in both the frequency and

  17. Schedule reconciliation tests for management prudency determination

    International Nuclear Information System (INIS)

    Howell, G.E.

    1986-01-01

    The prudency audit of a nuclear project involves engineering, construction, financial, and management dimensions. The audit must retrospectively evaluate the decisions and actions of management decision makers and then equitably allocate the cost impacts of those decisions and actions in a comprehensive and objective manner. In most situations, determination of the impact of schedule delays is a paramount issue. Manzi and Associates uses an approach to schedule reconciliation that focuses on the site-specific, as-built condition. The as-built schedule model is analyzed by a backward pass, or but-for methodology which focuses on the causes and impacts of identified delays. The objective is to demonstrate that but-for the identified delay, the project could have been built in the as-planned time frame. The but-for methodology has been used in many contract dispute cases and is currently being applied to schedule reconciliation on several nuclear plants. The potential for applying this methodology to both new construction and retrofit projects is great

  18. 78 FR 37246 - January 2013 Pay Schedules

    Science.gov (United States)

    2013-06-20

    ... incorporated as part of this notice. U.S. Office of Personnel Management. Elaine Kaplan, Acting Director... MANAGEMENT January 2013 Pay Schedules AGENCY: U.S. Office of Personnel Management. ACTION: Notice. SUMMARY... levels. This notice serves as documentation for the public record. FOR FURTHER INFORMATION CONTACT...

  19. Scheduling in Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2015-01-01

    Full Text Available This issue presents five papers selected from the 2013 (4th International Conference on Engineering, Project, and Production Management (EPPM2013 held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  20. Cost-efficient scheduling of FAST observations

    Science.gov (United States)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  1. Flexible Scheduling in Multimedia Kernels: An Overview

    NARCIS (Netherlands)

    Jansen, P.G.; Scholten, Johan; Laan, Rene; Chow, W.S.

    1999-01-01

    Current Hard Real-Time (HRT) kernels have their timely behaviour guaranteed on the cost of a rather restrictive use of the available resources. This makes current HRT scheduling techniques inadequate for use in a multimedia environment where we can make a considerable profit by a better and more

  2. Stochastic online scheduling on parallel machines

    NARCIS (Netherlands)

    Persiano, G; Megow, N.; Uetz, Marc Jochen; Solis-Oba, R; Vredeveld, T.

    We consider a non-preemptive, stochastic parallel machine scheduling model with the goal to minimize the weighted completion times of jobs. In contrast to the classical stochastic model where jobs with their processing time distributions are known beforehand, we assume that jobs appear one by one,

  3. Parental Work Schedules and Adolescent Risky Behaviors

    Science.gov (United States)

    Han, Wen-Jui; Miller, Daniel P.; Waldfogel, Jane

    2010-01-01

    Using a large contemporary data set (the National Longitudinal Survey of Youth-Child Supplement), the authors examined the effects of parental work schedules on adolescent risky behaviors at age 13 or 14 and the mechanisms that might explain them. Structural equation modeling suggests mothers who worked more often at night spent significantly less…

  4. Intelligence amplification framework for enhancing scheduling processes

    NARCIS (Netherlands)

    Dobrkovic, Andrej; Liu, Luyao; Iacob, Maria Eugenia; van Hillegersberg, Jos

    2016-01-01

    The scheduling process in a typical business environment consists of predominantly repetitive tasks that have to be completed in limited time and often containing some form of uncertainty. The intelligence amplification is a symbiotic relationship between a human and an intelligent agent. This

  5. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference...

  6. Verifiable Task Assignment and Scheduling Controller

    Science.gov (United States)

    2017-07-01

    AFRL-RH-WP-TR-2017-0045 Verifiable Task Assignment and Scheduling Controller Clayton Rothwell Infoscitex Corporation...Chief, Supervisory Control Cognition Branch Supervisory Control and Cognition Branch Warfighter Interface Division //signed// KRISTOFFER A...information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM

  7. 37 CFR 2.85 - Classification schedules.

    Science.gov (United States)

    2010-07-01

    ... classification, where appropriate. (f) Classification schedules shall not limit or extend the applicant's rights.... (a) International classification system. Section 6.1 of this chapter sets forth the international... international classification pursuant to § 2.85(e)(3). (b) Prior United States classification system. Section 6...

  8. Intensive Scheduling: When Less Is More.

    Science.gov (United States)

    Ryan, Francis, J.

    1996-01-01

    Examines the potential benefits of intensive scheduling, an alternative to traditional school day structuring that allows students to take fewer classes but stay in them longer. Suggests that fewer and longer classes accommodate more cooperative learning styles and enhance student academic performance. Includes descriptions of several intensive…

  9. Reinventing Crew Scheduling at Netherlands Railways

    NARCIS (Netherlands)

    M. Fischetti (Matteo); L.G. Kroon (Leo); G. Timmer (Gerrit); M.J.C.M. Vromans (Michiel); E.J.W. Abbink (Erwin)

    2004-01-01

    textabstractIn this paper we describe the successful application of a sophisticated Operations Research model and the corresponding solution techniques for scheduling the 6,500+ drivers and conductors of the Dutch railway operator NS Reizigers (Netherlands Railways). In 2001 the drivers and

  10. The Home Care Crew Scheduling Problem

    DEFF Research Database (Denmark)

    Rasmussen, Matias Sevel; Justesen, Tor

    In the Home Care Crew Scheduling Problem (HCCSP) a staff of caretakers has to be assigned a number of visits, such that the total number of assigned visits is maximised. The visits have different locations and positions in time, and travelling time and time windows must be respected. The challenge...

  11. Adaptive Patient Scheduling with Dynamic Resource Usage

    NARCIS (Netherlands)

    I.B. Vermeulen (Ivan); S.M. Bohte (Sander); J.A. La Poutré (Han)

    2007-01-01

    htmlabstractCan patient planning be more efficient? The Computational Intelligence and Multiagent Games (SEN4) research group at CWI uses software agents and smart, adaptive algorithms to improve hospital patient scheduling and to better match patients’ appointments to their own preferences.

  12. Crane Scheduling on a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper

    2002-01-01

    OSS produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. Two gantry cranes carry out this task. The planning task is now to create a schedule of movements for the 2 cranes...

  13. Online Scheduling in Distributed Message Converter Systems

    NARCIS (Netherlands)

    Risse, Thomas; Wombacher, Andreas; Surridge, Mike; Taylor, Steve; Aberer, Karl

    The optimal distribution of jobs among hosts in distributed environments is an important factor to achieve high performance. The optimal strategy depends on the application. In this paper we present a new online scheduling strategy for distributed EDI converter system. The strategy is based on the

  14. Split Scheduling with Uniform Setup Times

    NARCIS (Netherlands)

    Schalekamp, F.; Sitters, R.A.; van der Ster, S.L.; Stougie, L.; Verdugo, V.; van Zuylen, A.

    2015-01-01

    We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a machine cannot process or

  15. Split scheduling with uniform setup times.

    NARCIS (Netherlands)

    F. Schalekamp; R.A. Sitters (René); S.L. van der Ster; L. Stougie (Leen); V. Verdugo; A. van Zuylen

    2015-01-01

    htmlabstractWe study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a

  16. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes project performance data reported through March 1989

  17. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...

  18. Advance Resource Provisioning in Bulk Data Scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Balman, Mehmet

    2012-10-01

    Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

  19. Maximizing System Lifetime by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.; Bohnenkamp, H.C.; Katoen, Joost P.

    2009-01-01

    The use of mobile devices is limited by the battery lifetime. Some devices have the option to connect an extra battery, or to use smart battery-packs with multiple cells to extend the lifetime. In these cases, scheduling the batteries over the load to exploit recovery properties usually extends the

  20. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  1. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  2. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  3. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  4. Scheduling Broadcasts in a Network of Timelines

    KAUST Repository

    Manzoor, Emaad A.

    2015-05-12

    Broadcasts and timelines are the primary mechanism of information exchange in online social platforms today. Services like Facebook, Twitter and Instagram have enabled ordinary people to reach large audiences spanning cultures and countries, while their massive popularity has created increasingly competitive marketplaces of attention. Timing broadcasts to capture the attention of such geographically diverse audiences has sparked interest from many startups and social marketing gurus. However, formal study is lacking on both the timing and frequency problems. In this thesis, we introduce, motivate and solve the broadcast scheduling problem of specifying the timing and frequency of publishing content to maximise the attention received. We validate and quantify three interacting behavioural phenomena to parametrise social platform users: information overload, bursty circadian rhythms and monotony aversion, which is defined here for the first time. Our analysis of the influence of monotony refutes the common assumption that posts on social network timelines are consumed piecemeal independently. Instead, we reveal that posts are consumed in chunks, which has important consequences for any future work considering human behaviour over social network timelines. Our quantification of monotony aversion is also novel, and has applications to problems in various domains such as recommender list diversification, user satiation and variety-seeking consumer behaviour. Having studied the underlying behavioural phenomena, we link schedules, timelines, attention and behaviour by formalising a timeline information exchange process. Our formulation gives rise to a natural objective function that quantifies the expected collective attention an arrangement of posts on a timeline will receive. We apply this formulation as a case-study on real-data from Twitter, where we estimate behavioural parameters, calculate the attention potential for different scheduling strategies and, using the

  5. "Artificial intelligence" at streamgaging stations

    Science.gov (United States)

    R. B. Thomas

    1985-01-01

    Two types of problems are related to collecting hydrologic data at stream gaging stations. One includes the technical/logistical questions associated with measuring and transferring data for processing. Effort spent on these problems ranges from improving devices for sensing data to using electronic data loggers.

  6. The Medicina Station Status Report

    Science.gov (United States)

    Orfei, Alessandro; Orlati, Andrea; Maccaferri, Giuseppe

    2013-01-01

    General information about the Medicina Radio Astronomy Station, the 32-m antenna status, and the staff in charge of the VLBI observations is provided. In 2012, the data from geodetic VLBI observations were acquired using the Mark 5A recording system with good results. Updates of the hardware were performed and are briefly described.

  7. Remote input/output station

    CERN Multimedia

    1972-01-01

    A general view of the remote input/output station installed in building 112 (ISR) and used for submitting jobs to the CDC 6500 and 6600. The card reader on the left and the line printer on the right are operated by programmers on a self-service basis.

  8. Performance of Existing Hydrogen Stations

    Energy Technology Data Exchange (ETDEWEB)

    Sprik, Samuel [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kurtz, Jennifer M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ainscough, Christopher D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Peters, Michael C [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-12-01

    In this presentation, the National Renewable Energy Laboratory presented aggregated analysis results on the performance of existing hydrogen stations, including performance, operation, utilization, maintenance, safety, hydrogen quality, and cost. The U.S. Department of Energy funds technology validation work at NREL through its National Fuel Cell Technology Evaluation Center (NFCTEC).

  9. Delay distributions in railway stations

    NARCIS (Netherlands)

    Goverde, R.M.P.; Hansen, I.A.; Hooghiemstra, G.; Lopuhaa, H.P.

    2001-01-01

    The estimation of the precise arrival and departure times of trains at stations is done by means of a software tool that extracts the occupation and clearance times of each train per track section of the Dutch Railways‘ network. The software tool was applied to the whole automatically collected set

  10. Space station molecular sieve development

    Science.gov (United States)

    Chang, C.; Rousseau, J.

    1986-01-01

    An essential function of a space environmental control system is the removal of carbon dioxide (CO2) from the atmosphere to control the partial pressure of this gas at levels lower than 3 mm Hg. The use of regenerable solid adsorbents for this purpose was demonstrated effectively during the Skylab mission. Earlier sorbent systems used zeolite molecular sieves. The carbon molecular sieve is a hydrophobic adsorbent with excellent potential for space station application. Although carbon molecular sieves were synthesized and investigated, these sieves were designed to simulate the sieving properties of 5A zeolite and for O2/N2 separation. This program was designed to develop hydrophobic carbon molecular sieves for CO2 removal from a space station crew environment. It is a first phase effort involved in sorbent material development and in demonstrating the utility of such a material for CO2 removal on space stations. The sieve must incorporate the following requirements: it must be hydrophobic; it must have high dynamic capacity for carbon dioxide at the low partial pressure of the space station atmosphere; and it must be chemiclly stable and will not generate contaminants.

  11. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  12. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  13. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  14. A Closed Mars Analog Simulation: The Approach of Crew 5 At the Mars Desert Research Station

    Science.gov (United States)

    Clancey, William J.; Koga, Dennis (Technical Monitor)

    2002-01-01

    For twelve days in April 2002 we performed a closed simulation in the Mars Desert Research Station, isolated from other people, as on Mars, while performing systematic surface exploration and life support chores. Email provided our only means of contact; no phone or radio conversations were possible. All mission-related messages were mediated by a remote mission support team. This protocol enabled a systematic and controlled study of crew activities, scheduling, and use of space. The analysis presented here focuses on two questions: Where did the time go-why did people feel rushed and unable to complete their work? How can we measure and model productivity, to compare habitat designs, schedules, roles, and tools? Analysis suggests that a simple scheduling change-having lunch and dinner earlier, plus eliminating afternoon meetings-increased the available productive time by 41%.

  15. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  16. 47 CFR 73.6018 - Digital Class A TV station protection of DTV stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital Class A TV station protection of DTV... TV station protection of DTV stations. Digital Class A TV stations must protect the DTV service that... application for digital operation of an existing Class A TV station or to change the facilities of a digital...

  17. 47 CFR 80.107 - Service of private coast stations and marine-utility stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Service of private coast stations and marine...) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Operating Procedures-Land Stations § 80.107 Service of private coast stations and marine-utility stations. A...

  18. A matheuristic approach for solving the Integrated Timetabling and Vehicle Scheduling Problem

    DEFF Research Database (Denmark)

    Fonseca, Joao Filipe Paiva; Larsen, Allan; van der Hurk, Evelien

    that considers both operational costs and passenger transfer costs. Starting from a base timetable, the allowed modifications include shifting the departure time from the first station of each trip and also the extension of dwell times at important stops where large flows of passengers are expected to transfer...... between different trips. We consider transfers between bus trips scheduled by the model, but also transfers to other fixed lines that intersect the lines considered in the IT-VSP. We present a MIP formulation of the IT-VSP able to solve small instances of the problem, and a matheuristic approach that uses...

  19. Advisory Algorithm for Scheduling Open Sectors, Operating Positions, and Workstations

    Science.gov (United States)

    Bloem, Michael; Drew, Michael; Lai, Chok Fung; Bilimoria, Karl D.

    2012-01-01

    Air traffic controller supervisors configure available sector, operating position, and work-station resources to safely and efficiently control air traffic in a region of airspace. In this paper, an algorithm for assisting supervisors with this task is described and demonstrated on two sample problem instances. The algorithm produces configuration schedule advisories that minimize a cost. The cost is a weighted sum of two competing costs: one penalizing mismatches between configurations and predicted air traffic demand and another penalizing the effort associated with changing configurations. The problem considered by the algorithm is a shortest path problem that is solved with a dynamic programming value iteration algorithm. The cost function contains numerous parameters. Default values for most of these are suggested based on descriptions of air traffic control procedures and subject-matter expert feedback. The parameter determining the relative importance of the two competing costs is tuned by comparing historical configurations with corresponding algorithm advisories. Two sample problem instances for which appropriate configuration advisories are obvious were designed to illustrate characteristics of the algorithm. Results demonstrate how the algorithm suggests advisories that appropriately utilize changes in airspace configurations and changes in the number of operating positions allocated to each open sector. The results also demonstrate how the advisories suggest appropriate times for configuration changes.

  20. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  1. 76 FR 65424 - Schedules of Controlled Substances: Placement of Ezogabine Into Schedule V

    Science.gov (United States)

    2011-10-21

    ... cause. 21 U.S.C. 812. The initial schedules of controlled substances by statute are found at 21 U.S.C... substances such as alprazolam can range from mild dysphoria and insomnia to a major syndrome including...

  2. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ... hyperthermia, seizures, hyponatremia, bruxism, sweating, hypertension, tachycardia, headache, palpitations... departments of individuals exposed to methylone with symptoms that include tachycardia, headache, palpitations... medical use, classification of methylone as a Schedule I controlled substance was appropriate. Another...

  3. Analyzing Job Aware Scheduling Algorithm in Hadoop for Heterogeneous Cluster

    Directory of Open Access Journals (Sweden)

    Mayuri A Mehta

    2015-12-01

    Full Text Available A scheduling algorithm is required to efficiently manage cluster resources in a Hadoop cluster, thereby to increase resource utilization and to reduce response time. The job aware scheduling algorithm schedules non-local map tasks of jobs based on job execution time, earliest deadline first or workload of the job. In this paper, we present the performance evaluation of the job aware scheduling algorithm using MapReduce WordCount benchmark. The experimental results are compared with matchmaking scheduling algorithm. The results show that the job aware scheduling algorithm reduces average waiting time and memory wastage considerably as compared to matchmaking algorithm.

  4. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  5. Management techniques that keep outages on schedule

    International Nuclear Information System (INIS)

    Taylor, R.B.

    1987-01-01

    During the immature operation of the Pickering Units 5 through 8, significant numbers of outages have been required to deal with warranty inspections and equipment problems. Techniques have been developed to ensure that outages are properly planned and managed so that outage time is minimized, overtime is minimized, and capacity factor is maximized, while ensuring that personnel safety is not compromised. Successful outage planning and execution requires the commitment of many on-station and off-station resources groups. Coordination of all of these groups is required both before and during the outage to ensure outage time is not lost due to unavailability of men or equipment at the time they are required. This paper details the control processes that must be used prior to, during, and after an outage to ensure that time is not lost unnecessarily during outages. Successful outage management at Pickering Nuclear Generating Station can be subdivided into three stages; preoutage planning, outage execution, and postoutage review

  6. Cost Minimization for Joint Energy Management and Production Scheduling Using Particle Swarm Optimization

    Science.gov (United States)

    Shah, Rahul H.

    Production costs account for the largest share of the overall cost of manufacturing facilities. With the U.S. industrial sector becoming more and more competitive, manufacturers are looking for more cost and resource efficient working practices. Operations management and production planning have shown their capability to dramatically reduce manufacturing costs and increase system robustness. When implementing operations related decision making and planning, two fields that have shown to be most effective are maintenance and energy. Unfortunately, the current research that integrates both is limited. Additionally, these studies fail to consider parameter domains and optimization on joint energy and maintenance driven production planning. Accordingly, production planning methodology that considers maintenance and energy is investigated. Two models are presented to achieve well-rounded operating strategy. The first is a joint energy and maintenance production scheduling model. The second is a cost per part model considering maintenance, energy, and production. The proposed methodology will involve a Time-of-Use electricity demand response program, buffer and holding capacity, station reliability, production rate, station rated power, and more. In practice, the scheduling problem can be used to determine a joint energy, maintenance, and production schedule. Meanwhile, the cost per part model can be used to: (1) test the sensitivity of the obtained optimal production schedule and its corresponding savings by varying key production system parameters; and (2) to determine optimal system parameter combinations when using the joint energy, maintenance, and production planning model. Additionally, a factor analysis on the system parameters is conducted and the corresponding performance of the production schedule under variable parameter conditions, is evaluated. Also, parameter optimization guidelines that incorporate maintenance and energy parameter decision making in the

  7. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  8. 2-Layered Architecture of Vague Logic Based Multilevel Queue Scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2014-01-01

    Full Text Available In operating system the decisions which CPU scheduler makes regarding the sequence and length of time the task may run are not easy ones, as the scheduler has only a limited amount of information about the tasks. A good scheduler should be fair, maximizes throughput, and minimizes response time of system. A scheduler with multilevel queue scheduling partitions the ready queue into multiple queues. While assigning priorities, higher level queues always get more priorities over lower level queues. Unfortunately, sometimes lower priority tasks get starved, as the scheduler assures that the lower priority tasks may be scheduled only after the higher priority tasks. While making decisions scheduler is concerned only with one factor, that is, priority, but ignores other factors which may affect the performance of the system. With this concern, we propose a 2-layered architecture of multilevel queue scheduler based on vague set theory (VMLQ. The VMLQ scheduler handles the impreciseness of data as well as improving the starvation problem of lower priority tasks. This work also optimizes the performance metrics and improves the response time of system. The performance is evaluated through simulation using MatLab. Simulation results prove that the VMLQ scheduler performs better than the classical multilevel queue scheduler and fuzzy based multilevel queue scheduler.

  9. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  10. Present and future hydropower scheduling in Statkraft

    Science.gov (United States)

    Bruland, O.

    2012-12-01

    Statkraft produces close to 40 TWH in an average year and is one of the largest hydropower producers in Europe. For hydropower producers the scheduling of electricity generation is the key to success and this depend on optimal use of the water resources. The hydrologist and his forecasts both on short and on long terms are crucial to this success. The hydrological forecasts in Statkraft and most hydropower companies in Scandinavia are based on lumped models and the HBV concept. But before the hydrological model there is a complex system for collecting, controlling and correcting data applied in the models and the production scheduling and, equally important, routines for surveillance of the processes and manual intervention. Prior to the forecasting the states in the hydrological models are updated based on observations. When snow is present in the catchments snow surveys are an important source for model updating. The meteorological forecast is another premise provider to the hydrological forecast and to get as precise meteorological forecast as possible Statkraft hires resources from the governmental forecasting center. Their task is to interpret the meteorological situation, describe the uncertainties and if necessary use their knowledge and experience to manually correct the forecast in the hydropower production regions. This is one of several forecast applied further in the scheduling process. Both to be able to compare and evaluate different forecast providers and to ensure that we get the best available forecast, forecasts from different sources are applied. Some of these forecasts have undergone statistical corrections to reduce biases. The uncertainties related to the meteorological forecast have for a long time been approached and described by ensemble forecasts. But also the observations used for updating the model have a related uncertainty. Both to the observations itself and to how well they represent the catchment. Though well known, these

  11. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  12. Holonic fleet scheduling with TeleTruck

    Science.gov (United States)

    Bürckert, Hans-Jürgen; Fischer, Klaus; Vierke, Gero

    1999-03-01

    In this paper we describe the TeleTruck approach for multi-agent fleet scheduling. In close collaboration with a forwarding company we developed a multiagent system with holonic agents that will support dispatch officers in transport scheduling. The system is capable of handling real-world requirements like dynamics and uncertainty. Holonic agents are agents which are composed of sub-agents acting in a corporate way. We give a brief overview of the current state of the TeleTruck application prototype. We discuss requirements of communication, coordination, and resource control that distinguish holonic from common multiagent systems and we show, how we integrated these concepts with the three-layered agent architecture INTERRAP, in order to result in a smooth implementation of a dispatch support system.

  13. Sensor Transmission Power Schedule for Smart Grids

    Science.gov (United States)

    Gao, C.; Huang, Y. H.; Li, J.; Liu, X. D.

    2017-11-01

    Smart grid has attracted much attention by the requirement of new generation renewable energy. Nowadays, the real-time state estimation, with the help of phasor measurement unit, plays an important role to keep smart grid stable and efficient. However, the limitation of the communication channel is not considered by related work. Considering the familiar limited on-board batteries wireless sensor in smart grid, transmission power schedule is designed in this paper, which minimizes energy consumption with proper EKF filtering performance requirement constrain. Based on the event-triggered estimation theory, the filtering algorithm is also provided to utilize the information contained in the power schedule. Finally, its feasibility and performance is demonstrated using the standard IEEE 39-bus system with phasor measurement units (PMUs).

  14. Multitasking Scheduling Problems with Deterioration Effect

    Directory of Open Access Journals (Sweden)

    Zhanguo Zhu

    2017-01-01

    Full Text Available Multitasking scheduling problems with a deterioration effect incurred by coexisting behavioral phenomena in human-related scheduling systems including deteriorating task processing times and deteriorating rate-modifying activity (DRMA of human operators are addressed. Under the assumption of this problem, the processing of a selected task suffers from the joint effect of available but unfinished waiting tasks, the position-dependent deterioration of task processing time, and the DRMA of human operators. Traditionally, these issues have been considered separately; herein, we address their integration. We propose optimal algorithms to solve the problems to minimize makespan and the total absolute differences in completion time, respectively. Based on the analysis, some special cases and extensions are also discussed.

  15. Software Schedules Missions, Aids Project Management

    Science.gov (United States)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  16. Multiprocessor scheduling for real-time systems

    CERN Document Server

    Baruah, Sanjoy; Buttazzo, Giorgio

    2015-01-01

    This book provides a comprehensive overview of both theoretical and pragmatic aspects of resource-allocation and scheduling in multiprocessor and multicore hard-real-time systems.  The authors derive new, abstract models of real-time tasks that capture accurately the salient features of real application systems that are to be implemented on multiprocessor platforms, and identify rules for mapping application systems onto the most appropriate models.  New run-time multiprocessor scheduling algorithms are presented, which are demonstrably better than those currently used, both in terms of run-time efficiency and tractability of off-line analysis.  Readers will benefit from a new design and analysis framework for multiprocessor real-time systems, which will translate into a significantly enhanced ability to provide formally verified, safety-critical real-time systems at a significantly lower cost.

  17. Power Efficient Hierarchical Scheduling for DSP Transformations

    Directory of Open Access Journals (Sweden)

    P. K. Merakos

    2002-01-01

    Full Text Available In this paper, the problem of scheduling the computation of partial products in transformational Digital Signal Processing (DSP algorithms, aiming at the minimization of the switching activity in data and address buses, is addressed. The problem is stated as a hierarchical scheduling problem. Two different optimization algorithms, which are based on the Travelling Salesman Problem (TSP, are defined. The proposed optimization algorithms are independent on the target architecture and can be adapted to take into account it. Experimental results obtained from the application of the proposed algorithms in various widely used DSP transformations, like Discrete Cosine Transform (DCT and Discrete Fourier Transform (DFT, show that significant switching activity savings in data and address buses can be achieved, resulting in corresponding power savings. In addition, the differences between the two proposed methods are underlined, providing envisage for their suitable selection for implementation, in particular transformational algorithms and architectures.

  18. A Network Simulation Tool for Task Scheduling

    Directory of Open Access Journals (Sweden)

    Ondřej Votava

    2012-01-01

    Full Text Available Distributed computing may be looked at from many points of view. Task scheduling is the viewpoint, where a distributed application can be described as a Directed Acyclic Graph and every node of the graph is executed independently. There are, however, data dependencies and the nodes have to be executed in a specified order. Hence the parallelism of the execution is limited. The scheduling problem is difficult and therefore heuristics are used. However, many inaccuracies are caused by the model used for the system, in which the heuristics are being tested. In this paper we present a tool for simulating the execution of the distributed application on a “real” computer network, and try to tell how the executionis influenced compared to the model.

  19. Medications for Sleep Schedule Adjustments in Athletes.

    Science.gov (United States)

    Baird, Matthew B; Asif, Irfan M

    Sleep schedule adjustments are common requirements of modern-day athletes. Many nonpharmacologic and pharmacologic strategies exist to facilitate circadian rhythm shifts to maximize alertness and performance during competition. This review summarizes the evidence for commonly used pharmacologic agents and presents recommendations for the sports medicine provider. MEDLINE searches were performed using the following keywords: sleep aids, circadian rhythm adjustment, athletes and sleep, caffeine and sports, melatonin and athletes, and sleep aids and sports. Pertinent articles were extracted and discussed. Clinical review. Level 2. There are very few available studies investigating pharmacologic sleep aids in athletes. Data from studies involving shift workers and airline personnel are more abundant and were used to formulate recommendations and conclusions. Melatonin, caffeine, and nonbenzodiazepine sleep aids have a role in facilitating sleep schedule changes in athletes and maximizing sports performance through sleep enhancement.

  20. Load scheduling for decentralized CHP plants

    DEFF Research Database (Denmark)

    Nielsen, Henrik Aalborg, orlov 31.07.2008; Madsen, Henrik; Nielsen, Torben Skov

    be obtained. Furthermore, we believe that all relevant forecasting methods are far too complicated to allow for this integration; both uncertainties originating from the dependence of heat load on climate and from meteorological forecasts need to be taken into account. Instead we suggest that the decision......This report considers load scheduling for decentralized combined heat and power plants where the revenue from selling power to the transmission company and the fuel cost may be time-varying. These plants produce both heat and power with a fixed ratio between these outputs. A heat storage facility...... is used to be able to deviate from this restriction. The load scheduling must be performed with only approximate knowledge about the future. At present in Denmark this uncertainty is only associated with the heat demand, but in the future revenues of produced energy and the fuel costs might also...