WorldWideScience

Sample records for splicer line installer

  1. spliceR

    DEFF Research Database (Denmark)

    Vitting-Seerup, Kristoffer; Porse, Bo Torben; Sandelin, Albin

    2014-01-01

    RNA-seq data is currently underutilized, in part because it is difficult to predict the functional impact of alternate transcription events. Recent software improvements in full-length transcript deconvolution prompted us to develop spliceR, an R package for classification of alternative splicing...

  2. Helium transfer line installation details.

    CERN Multimedia

    G. Perinic

    2007-01-01

    A particularity of the 32 m long four in one helium transfer line in between the cold box in USC55 and the cavern UX5 is the fact that the transfer line passes through a hole in the crane rail support beam. In order to ensure the alignment of the suspension rail in the interconnecting tunnel with the hole in the rail support as well as the connection points at both ends required precise measurements of the given geometries as well as the installation of a temporary target for the verification of the theoretical predictions.

  3. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  4. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  5. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  6. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photo 01: Pictured with the newly installed magnet and transport system in the transfer line tunnel are (left to right) Volker Mertens, responsible for the LHC injection and transfer lines; personnel involved in tr...

  7. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system. Here we see the transport vehicle alongside the magnet supports. Visible in the background is the first magnet in place.

  8. Installation of the LHC transfer lines begins

    CERN Multimedia

    2003-01-01

    On 19 February, the very first magnet was installed in one of the two tunnels that will house the transfer lines leading to the LHC. This magnet, recycled from a previous facility, was transported and positioned using a novel system designed for conveying large objects through narrow tunnels.

  9. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photos 01, 02: Pictured with the newly installed magnet and transport system in the transfer line tunnel are LHC project leader Lyn Evans (second left, white helmet); Volker Mertens, responsible for the LHC injecti...

  10. Improvement of hydrocyclone installations for starch production lines

    Directory of Open Access Journals (Sweden)

    N. R. Andreev

    2016-01-01

    Full Text Available Multicyclonic installations contain up to 15 steps of division (multicyclones. Improvement of work quality at the reduction of quantity of steps of division can be reached by increasing an starch yield from the step with the reduction of an exit of a liquid phase. To achieve that, a connection of three multicyclones according to the cross scheme is used as for a step of division instead of a separate multicyclone. It is shown that at the three multicyclones a step of division of change in redistribution of suspension components is created the design solution of the division step where liquid products are going out with only to liquid ones, and condensed products – only with condensed ones. At this step the starch yield increases in the condensed product while reducing the end product volume; therefore is received in one step the higher quality starch because of its increased quantity in the condensed descent product step. However, at such connection of multicyclones starch gets to a liquid descent of each step, therefore it is condensed additionally to release starch by con-necting of four multicyclones in to one step of division. New multistage multicyclonic installation consists of 12 multicyclones instead of 15 ones. That reduces capital and operational costs. Thus, varying manipulating the scheme of microcyclones connection in the unit, it is possible to receive the required technological result with the improved economic indicators. AllRussian Research Institute of starch products has developed lines of potato processing for dry starch on the basis 10 and 50 t / per day of initial raw materials using hydrocyclone installations. That allows to organize a new production without big capital expenditures. The hydrocyclone design with the changed external way of supply of suspension is developed at which the flow enters the already rotating product to exclude the influence of an inflow on the quality of suspension fractionation.

  11. 49 CFR 192.361 - Service lines: Installation.

    Science.gov (United States)

    2010-10-01

    ... millimeters) of cover in streets and roads. However, where an underground structure prevents installation at... used for backfill must be free of materials that could damage the pipe or its coating. (c) Grading for...

  12. The Lightning Performance of Overhead Distribution Line Installed Mov and Clah Surge Arresters

    Science.gov (United States)

    Thanasaksiri, T.

    2008-10-01

    This paper compares the lightning performance of overhead distribution line which installed two arrester types, metal oxide varistor (MOV) and current limiting arcing horn (CLAH). The performance of line which related to the insulator flashover, with and without arresters installed, has been modeled and analyzed using EMTP. The MOV arrester type gives better line lightning performance. The relatively wide arrester spacings will reduce the lightning performance. The arrester leads should be kept as short as possible.

  13. Feasibility of evaluating possible 85Kr environmental contamination from neon lamp production line to be installed

    International Nuclear Information System (INIS)

    Li Guangzuo

    1989-01-01

    Using a simplified method, the concentrations of 85 Kr leaking into the air of a workshop and its surroundings, where a neon lamp production line was to be installed, were calculated. The doses to the workers and inhabitants nearby were also estimated. Thus, the evaluation of 85 Kr enviromental contamination caused by imported equipments was made feasible

  14. Feasibility Study for Installing Machine in Production Line to Avoid Particle Contamination Based on CFD Simulation

    Science.gov (United States)

    Khaokom, Adisorn; Thongsri, Jatuporn

    2017-10-01

    Ventilation system inside production line for electronic component production needs to meet the factory standard. Because it can eliminate small particles which may cause of human or machine in production as well as it can distribute the circulating air temperature uniformly. CFD is used in this research in order to study the feasibility and plan for machine layout in production line before actual installation. The simulation shows the airflow in every area inside production line. From simulation with releasing the particles from human and machine is found that this ventilation system generates airflow that makes most particles float out of the machines and no particle downs to the conveyor, it results to contamination. In addition, the simulation also shows the range of 19-26 °C air temperature that meets the factory standard. The results of this research are the parts of the data to renovate the production line to get more efficiency and proper on the production.

  15. Practices for improving the serviceability of linings installations in open systems

    International Nuclear Information System (INIS)

    Spieres, G.V.; Tombaugh, R.S.

    2001-01-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  16. Practices for improving the serviceability of linings installations in open systems

    Energy Technology Data Exchange (ETDEWEB)

    Spieres, G.V. [KTA - Tator Inc., Pittsburgh, PE (United States); Tombaugh, R.S. [PPL Susquehanna, LLC, PE (United States)

    2001-07-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  17. Effect of Overhead Ground Wire Installing under Distribution Lines on Surge Arrester Failures

    Science.gov (United States)

    Sugimoto, Hitoshi

    Distribution surge arresters are often damaged by lightning strokes, in particular, winter lightning. An overhead ground wire (OGW) is one of effective measures against surge arrester failures. However, adding the conventional OGW to existing overhead power distribution lines needs the power interruption for construction as well as high costs because of installing them above phase conductors. Experimental results show that a covered conductor for distribution lines is more difficult to attract lightning than a bare conductor. Moreover, lightning strokes to distribution pole heads occupied over 90% of all lightning strokes in the observation result of lightning strokes to actual distribution lines without the conventional OGW, and lightning strokes to power lines were hardly observed. These results indicate that the pole heads shield the power lines from direct lightning strokes. Therefore the author studies the application of an OGW under the distribution lines (UGW) for reducing surge arrester failures. The lightning performance of the UGW is estimated by the Electro-Magnetic Transients Program (EMTP) and its effectiveness is demonstrated. The measure is expected to cut costs of construction and maintenance for lightning protection.

  18. Manufacturing and Installation of the Compound Cryogenic Distribution Line for the Large Hadron Collider

    CERN Document Server

    Riddone,, G; Bouillot, A; Brodzinski, K; Dupont, M; Fathallah, M; Fournel, JL; Gitton, E; Junker, S; Moussavi, H; Parente, C; Riddone, G

    2007-01-01

    The Large Hadron Collider (LHC) [1] currently under construction at CERN will make use of superconducting magnets operating in superfluid helium below 2 K. A compound cryogenic distribution line (QRL) will feed with helium at different temperatures and pressures the local elementary cooling loops in the cryomagnet strings. Low heat inleak to all temperature levels is essential for the overall LHC cryogenic performance. Following a competitive tendering, CERN adjudicated in 2001 the contract for the series line to Air Liquide (France). This paper recalls the main features of the technical specification and shows the project status. The basic choices and achievements for the industrialization phase of the series production are also presented, as well as the installation issues and status.

  19. Managing the risks of the backfill production line from material acquisition to installation

    International Nuclear Information System (INIS)

    Kiviranta, Leena; Kumpulainen, Sirpa; Keto, Paula; Autio, Jorma; Siivonen, Markku; Koho, Petri

    2012-01-01

    Document available in extended abstract form only. The tunnel backfill of Finnish KBS-3V type repository for spent nuclear fuel consists of foundation layer that is installed at site, pre-compacted backfill blocks that fill most of the tunnel and bentonite pellets to fill the gap between blocks and tunnel wall. In order to ensure the quality, availability, and timely delivery of backfill materials and components, and further to ensure the fulfillment of the requirements and specifications set for backfilling of deposition tunnels, the backfill production line was explored step-by-step, and risks related were defined and analyzed. The work described in this paper was initiated by Posiva Oy and is reported in Keto et al. (2012). The first part of the backfill production line is described in Figure 1 for Friedland clay that is designed to be used for the backfill blocks. It consists of excavation, processing and delivery of materials to backfill production facility. Second part of the production line consists of manufacturing of the backfill components, and the third part is the installation. A preliminary risk assessment was done in 2011 for the acquisition of Friedland clay and manufacturing and installation of foundation layer, blocks and pellets. The critical points of the production line were determined using a material flow description where risk is defined as a probability of something unwanted to happen times the severity of the consequences. Risk analysis was performed by going through the whole backfill production line step by step and analyzing all the incidents, which have occurred (or might occur) during the backfilling operations. A risk number from 1 to 25 was given to each step of the chain depending on how long delay the problem causes and how often it occurs. Low risk was the target for each step of the chain, medium risk was considered tolerable, for high risks management actions to decrease the risk number were considered and extremely high risks

  20. A neutral beam-line installation for testing injector systems in the long pulse, megawatt regime

    International Nuclear Information System (INIS)

    Brookes, C.E.; Coupland, J.R.; Green, T.S.; Hammond, D.P.; Hicks, J.B.; Hoskins, A.J.; Pedley, T.R.; West, W.A.

    1981-01-01

    The existing Megawatt Beam Line assembly is being upgraded primarily in order to test prototype JET injector modules to the full rating of 80 Kv, 60 A for pulse durations up to 5 seconds. Two extra vacuum tanks are being installed, together with additional cryopumps to bring the total pumping speed to 4 x 10 5 l/s, and an inertial beam stop calorimeter capable of absorbing the full beam power is being manufactured. The auxiliary electrical supply system is being re-designed to match the proposed 'bucket' type plasma source; the new 144 Kw arc supply has a quasi constant power characteristic in order to reduce fluctuations in beam intensity, and the filament supply is designed to stabilise the source cathodes in the required emission limited mode. The high voltage supply has 120 Kv open circuit voltage for the full beam current and a commercial series tube system which will provide voltage stabilisation, tracking, and fast protection has been ordered from the Systems, Science and Software Company. The assembly and testing of all major components is planned to be completed by early 1981 in order to meet the expected delivery time of the first JET prototype injector. (author)

  1. Overhead contact lines according to TSI Energy, installation design and technical acceptance; Oberleitungsanlagen nach TSI Energie. Planung und Abnahme

    Energy Technology Data Exchange (ETDEWEB)

    Schnadhorst, Kai [Balfour Beatty Rail GmbH, Essen (Germany); Tessun, Heinz [Balfour Beatty Rail GmbH, Muenchen (Germany)

    2011-04-15

    Comparison of the issues of 2002 and 2008 of the technical specification for interoperability relating to the ''energy'' sub-system of the trans-European high-speed rail system (TSI) influences, especially of the permissible wind deviation to the standard overhead contact line of Deutsche Bahn (DB). Installation design, acceptance, construction and technical approval of an overhead contact line in accordance with TSI. (orig.)

  2. Preliminary Guidelines for Installation Product Line Land Management Suite (LMS) Product Developers

    National Research Council Canada - National Science Library

    Westervelt, James; Dilks, Kelly M; Goran, William D

    2005-01-01

    .... This document provides an introduction to the new technologies and techniques and is written for all involved with installation land management software development including managers, supervisors...

  3. Technical-parameter calculation model for underground low-power electrical lines and indoor installations used in telecommunications

    Directory of Open Access Journals (Sweden)

    Henry Bastidas Mora

    2011-09-01

    Full Text Available This article presents an analysis of electrical distribution theory for 60Hz-lines operating at low voltage, particularly underground lines and residential indoor installations. Such distribution lines’ behaviour is observed as a function of frequency to consider any advantages regarding the potential use of power transmission lines (PTL for transmitting telecommunication signals. A method for computing the secondary parameters is proposed which has been based on the primary parameters, namely inductance, capacitance, conductance and resistance. The secondary parameters so obtained were characteristic impedance, propagation constant (together with its real value and the attenuation constant. Conductor configurations, insulation materials and gauges commonly used in Colombia were verified for such low-voltage lines. A mathematical model is proposed as a theoretical tool for analysing and predicting characteristic impedance pattern and the attenuations which occur at high frequencies, thereby complementing our group’s previous work. Conclusions are drawn, together with a perspective regarding future work and applications.

  4. TIGER/Line Shapefile, 2015, nation, U.S., Military Installation National Shapefile

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  5. TIGER/Line Shapefile, 2016, nation, U.S., Topological Faces-Military Installation Relationship File

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  6. TIGER/Line Shapefile, 2017, nation, U.S., Military Installation National Shapefile

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  7. TIGER/Line Shapefile, 2017, nation, U.S., Topological Faces-Military Installation Relationship File

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  8. Development and installation of a new on-line plant safety monitoring system for the Paks VVER-440 units

    International Nuclear Information System (INIS)

    Vegh, J.; Major, C.; Buerger, L.; Lipcsei, S.; Horvath, C.; Kapocs, G.; Eiler, J.; Hornaes, A.; Hulsund, J.E.

    2000-01-01

    The paper describes the architecture, modules, algorithms and human-machine interface of a new operator support system (OSS), which is integrated into the new, reconstructed Paks NPP plant computers. The main task of the new OSS is to perform continuous plant safety monitoring and assessment, it has the following basic functions: on-line evaluation and presentation of critical safety function (CSF) status trees, continuous evaluation and presentation of the actual safety status of the plant, displaying and browsing the new symptom-oriented EOPs, automatic displaying of those process signals which are quoted in the EOPs. The first version of the new operator support system was connected to the Paks NPP full scope simulator in October 1999. This configuration was later successfully applied for the simulator testing of the new symptom-oriented EOP set for the Paks NPP in November 1999. The installation process was continued in 2000: the new system started its operation on Unit 2 (June) and on Unit 1 (August), together with the reconstructed, new PCS. (author)

  9. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XVII, I--MAINTAINING THE LUBRICATION SYSTEM--CUMMINS DIESEL ENGINE, II--UNIT INSTALLATION AND REMOVAL--DRIVE LINES.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…

  10. The Power Behind the Controversy: Understanding Local Policy Elites' Perceptions on the Benefits and Risks Associated with High Voltage Power Line Installation in the State of Arkansas

    Science.gov (United States)

    Moyer, Rachael M.

    Following a proposal for the installation of high voltage power lines in northwest Arkansas, a controversial policy debate emerged. Proponents of the transmission line argue that such an installation is inevitable and necessary to efficiently and reliably support the identified electric load in the region. Opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. This study seeks to understand how local policy elites perceive the benefits and risks associated with proposed transmission lines, which is a critical step in comprehending the formation and changes of related government policies. First, based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high voltage power lines among local policy elites in the state of Arkansas. Next, this study focuses more specifically on the role of value predispositions, specific emotional dimensions of affect heuristics, and perceptions pertaining to high voltage power line risks and benefits. Using original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, other factors claimed by previous literature, including trust, knowledge level, and demographic characteristics are considered. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly -- through affective feelings -- shape perceived utility associated with the installation of high voltage power lines. Recognizing that risk perceptions factor into policy decisions, some practical considerations for better designing policy addressing controversial issues

  11. Durable Residual Wall Lining (DL) Installation Concepts and Acceptability as an IRS Replacement Tool for Malaria Vector Control

    DEFF Research Database (Denmark)

    Larsen, Marie Louise; Lenau, Torben Anker

    that will eliminate the need for repeated spraying of walls over a period of 3-4 years after installation. The objective of this project was to evaluate a variety of methods for attaching DL to various wall surfaces found in traditional, rural African housing. Assessments were made as to strength of attachment under...... various stresses and appearance after installation. The experiments took place in Anwona village near Obuasi, Ghana with the support and cooperation of AngloGold Ashanti’s Malaria Control Center. 55 mechanical and adhesive products were tested for their ability to hold a static load (simulating long...... observations were included in the DL Installation Manual, the final delivery of this project....

  12. TU-H-BRA-07: Design, Construction, and Installation of An Experimental Beam Line for the Development of MRI-Linac Compatible Electron Accelerator

    International Nuclear Information System (INIS)

    Whelan, B; Keall, P; Holloway, L; Gierman, S; Schmerge, J; Tantawi, S; Tremaine, A; Trautwein, A; Scott, B; Fahrig, R

    2016-01-01

    Purpose: MRI guided radiation therapy (MRIgRT) is a rapidly growing field; however, Linac operation in MRI fringe fields represents an ongoing challenge. We have previously shown in-silico that Linacs could be redesigned to function in the in-line orientation with no magnetic shielding by adopting an RF-gun configuration. Other authors have also published insilico studies of Linac operation in magnetic fields; however to date no experimental validation data is published. This work details the design, construction, and installation of an experimental beam line to validate our in-silico results. Methods: An RF-gun comprising 1.5 accelerating cells and capable of generating electron energies up to 3.2MeV is used. The experimental apparatus was designed to monitor both beam current (toroid current monitor), spot size (two phosphor screens with viewports), and generate peak magnetic fields of at least 1000G (three variable current electromagnetic coils). Thermal FEM simulations were developed to ensure coil temperature remained within 100degC. Other design considerations included beam disposal, vacuum maintenance, radiation shielding, earthquake safety, and machine protection interlocks. Results: The beam line has been designed, built, and installed in a radiation shielded bunker. Water cooling, power supplies, thermo-couples, cameras, and radiation shielding have been successfully connected and tested. Interlock testing, vacuum processing, and RF processing have been successfully completed. The first beam on is expected within weeks. The coil heating simulations show that with care, peak fields of up to 1200G (320G at cathode) can be produced using 40A current, which is well within the fields expected for MRI-Linac systems. The maximum coil temperature at this current was 84degC after 6 minutes. Conclusion: An experimental beam line has been constructed and installed at SLAC in order to experimentally characterise RF gun performance in in-line magnetic fields, validate

  13. Conceptual Design of On-line Based Licensing Review and Assesment System of Nuclear Installations and Nuclear Materials ('PRIBEN')

    International Nuclear Information System (INIS)

    Melani, Ai; Chang, Soon Heung

    2008-01-01

    At the present Indonesia has no nuclear power plant in operation yet, although it is expected that the first nuclear power plant will be operated and commercially available in around the year of 2016 to 2017 in Muria Peninsula. There are only three research reactors, one nuclear fuel fabrication plant for research reactors, and one experimental fuel fabrication plant for nuclear power, one isotope production facility and some other research facilities. All the facility is under Nuclear Energy Regulatory Agency (BAPETEN) controlling through regulation, licensing and inspection. The organizations operation submits licensing application to BAPETEN before utilizing the facility. According to the regulation before BAPETEN give license they perform review and assessment for the utility application. Based on the review and assessment result, BAPETEN may stipulate, reject, delay or terminate the license. In anticipation of expansion of the nuclear program in Indonesia, BAPETEN should have an integrated and updated system for review and asses the licensing application. For this reason, an expert system for the review and asses the licensing application, so-called PRIBEN (Perizinan Reaktor, Instalasi dan Bahan Nuklir/Licensing of Reactor, Nuclear Installations and Nuclear Materials), is developed which runs on the online-based reality environment

  14. On-line data acquisition and equipment failure detection system for the high-current phasotron (F installation)

    International Nuclear Information System (INIS)

    Denisov, Yu.N.; Anosov, V.N.; Dorukh, Kh.; Krug, Kh.; Leshchenko, G.P.; Onishchenko, L.M.; Potempa, M.; Saenko, V.A.; Shabashov, M.F.; Shishlyannikova, Z.N.

    1983-01-01

    On-line control system of the high-current phasotron (CS) has been described. CS is a multiprocessor hierarchy system, in which microcomputer processors ''Ehlektronika-60'' and CAMAC standard for intercomputer communication are used, as well as for communication between information processing equipment and the corresponding periphery microcomputer at the lower hierarchy Pack of programs, ensuring self-contained operation of precise measurements and rapid scanning systems, are designed and a dispatcher for periphery microcomputers, controlling the joint operation of the given system in the time sharing regime is envisaged. A program, controlling bilateral data exchange between peripheral and central microcomputer ASUS, developed and checked-out. A dispatcher of board microcomputer is being developed

  15. This picture was taken in 1967 during the first test of the Isotope On-Line Separator (ISOLDE) installation at the 600 MeV CERN Synchro Cyclotron.

    CERN Multimedia

    CERN PhotoLab

    1967-01-01

    When ISOLDE began operation, it was unique in the world. It used a new technique to overcome the problem of rapidly separating interesting atoms from the rest of the nuclear target. Through a combination of chemical and electromagnetic methods the different isotopes were separated and converted into an ion beam made of just one isotope. On-line production of radioactive nuclei, in this way, offered many new opportunities for physicists as it allowed them to perform previously impossible experiments on short-lived nuclei. ISOLDE has become one of CERN's major installations and it supports a broad scientific programme by providing beams to different experiments. The techniques developed at ISOLDE have opened up a new field of radioactive ion-beam accelerators, both at CERN and worldwide.

  16. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  17. Elaboration and installation of technology of on-line diagnostics of important equipment damage as a procedure of NPP lifetime management

    International Nuclear Information System (INIS)

    Bakirov, M.; Povarov, V.

    2012-01-01

    In contrast to conventional approaches used for diagnostics (i.e. when inspection results are used as data for numerical calculative strength analysis) the specific feature of the new proposed approach consists in a fact that the approach is based on application of the 'inverse problem' principle. As regards to implementation of the proposed new approach, first of all a detailed numerical calculative finite-element model of the monitored equipment must be developed. Results of preliminary calculations allow to make reasonable selection of definite installation places and types of control sensors intended for more effective and precise work of the calculative model. As a rule, the control sensors are high-temperature strain gauges, temperature probes, pressure, acceleration and displacement sensors, as well as acoustic-emission and ultrasonic sensors used for monitoring of actual defectiveness kinetics in the zone of potential damaging. All the sensors work in the on-line mode during several years of operation, the optimal frequency of data records is selected, all recorded data after prompt processing are transferred to the finite-element calculative modulus for strength calculations of a monitored zone. Software for strength calculation must be based on an individual calculative code, since it should also work in the on-line mode. Comprehensible strength analysis in conjunction with obtained results of defectiveness kinetics monitoring allow not only to foresee the most unfavorable scenario resulting to damaging, but also to have a possibility for prompt analysis and elaboration of compensating measures allowing to reduce operational loadings. In the report the results of development and practical application of the new approach at NPPs and corresponding technology are presented. (author)

  18. Project installation the large equipment in line system in Brazil. Gas export line valve P-40 FPSO-MLS. Field Marlim Sul, Campos Basin, Brazil; Operacao de instalacao do maior equipamento no sistema in line ja realizado no Brasil. Valvula do gasoduto P-40 X FPSO-MLS. Campo de Marlim Sul, Bacia de Campos, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Marques, Marcos Antonio Rodrigues; Fernandes, Paulo Tavares [PETROBRAS, Campos dos Goytacases, RJ (Brazil). Exploracao e Producao

    2005-07-01

    This work will approach the current level of development of the installation of connected underwater equipment to flexible lines in the underwater engineering operations in Campos' Basin. The project will show studies, analysis and simulations (through software developed by PETROBRAS) about the installation of the largest equipment laid in the 'in-line' system (connected to flexible lines) in Brazil - and one of the largest of the world: the ESDV (Emergency Shut Down Valve) of the gas pipeline P-40 x FPSO-MLS, in the South Marlim field, in Campos' Basin. This ESDV, of about 18.000 kg, 4 m height and 6,5 m length, has the purpose of assuring the safety conditions on the facilities, interrupting the gas flow exported for P-40 in case of emergency situations. Its installation opened a new alternative in releasing underwater equipment, using the ships that install the flexible lines. This operation occurred in June, 2004, and required the use of a second vessel for support and monitoring of the ESDV laying. The ESDV was installed at 400 m from FPSO-MLS, in a water depth of 1.137 m. This method shall be used broadly by the company in the implantation of the new units of Campos' Basin, and the upcoming studies must consider the gradual increase of the water depth in the new projects. This work will focus the technological development in this area, and one of its purposes is to foresee the future difficulties that can appear in the implantation of the production systems in deep and ultra-deep waters. (author)

  19. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  20. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  1. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  2. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  3. LINES

    Directory of Open Access Journals (Sweden)

    Minas Bakalchev

    2015-10-01

    Full Text Available The perception of elements in a system often creates their interdependence, interconditionality, and suppression. The lines from a basic geometrical element have become the model of a reductive world based on isolation according to certain criteria such as function, structure, and social organization. Their traces are experienced in the contemporary world as fragments or ruins of a system of domination of an assumed hierarchical unity. How can one release oneself from such dependence or determinism? How can the lines become less “systematic” and forms more autonomous, and less reductive? How is a form released from modernistic determinism on the new controversial ground? How can these elements or forms of representation become forms of action in the present complex world? In this paper, the meaning of lines through the ideas of Le Corbusier, Leonidov, Picasso, and Hitchcock is presented. Spatial research was made through a series of examples arising from the projects of the architectural studio “Residential Transformations”, which was a backbone for mapping the possibilities ranging from playfulness to exactness, as tactics of transformation in the different contexts of the contemporary world.

  4. The Thin Green Line: An Assessment of DoD’s Readiness and Environmental Protection Initiative to Buffer Installation Encroachment

    Science.gov (United States)

    2007-01-01

    RAND researchers interviewed expect prices to rise again near the installations. Summary xxi lations’ own interest to work with other government...land use zoning to help address encroachment. The Navy also has the Navy’s Encroachment Management Programas an adjunct to the AICUZ program. The

  5. Nuclear installations

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The subject is covered in sections, entitled: competent authorities; control by land use, planning, including licensing; site licences and permits; controls over design, construction, maintenance and operation; monitoring [of ionising radiations from anything on the site, or from anything discharged on or from the site] to be done by the discharger; additional precautions (reporting dangerous occurrences; extended period of the licensee's responsibilities; flying near nuclear installations); enforcement; rights of the individual (to be informed; to appeal or make representations in respect of permission being granted; to initiate or intervene in the enforcement process; to compensation and injunction. (U.K.)

  6. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  7. Some of the QRL team in UJ22 of the LHC tunnel, where the last sector of the cryogenic distribution line was installed.

    CERN Multimedia

    Viviane Li

    2006-01-01

    The cryogenic distribution line "the QRL" is a circle built in 8 sectors, each approximately 3 km in length. It will circulate helium in liquid and gas phases, at different temperatures and pressures, to provide the cryogenic conditions for the superconducting magnets in the LHC tunnel.

  8. Recommendations for main line block valves installation in gas pipelines; Recomendacoes para instalacao de valvulas de bloqueio de linha tronco em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Oliveira, Valeriano Duque de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Cases of gas pipelines block valves and its pneumatic actuators presenting problems during the final pipeline commissioning and pre-operation phases, like internal leaks, leaking to the atmosphere, pneumatic circuit defects caused by water and debris, are nearly common. The majority can be avoided if a series of measuring are to be planned and implemented, as well as if an adequate planning of commissioning operations and line gasification, valves and actuators, are to be applied. This paper shows the practical experience in the construction and commissioning of valves and its actuators in the Bolivia-Brazil gas pipeline, which, in the first construction phase had a series of problems. After the diagnosis a set of procedures was implemented in the secondary construction phase, resulting in insignificant problems detected. All measures and procedures taken in the planning process, as well as additional aspects related to the main line valve design, its by-passes and supports, are demonstrated. (author)

  9. Rehyd development and installation report

    International Nuclear Information System (INIS)

    Schuch, R.L.; Woodall, H.N.

    1977-12-01

    Rehyd, a low-impedance, HYDRA-type, water transmission line for bremsstrahlung exposures, was installed on the north side of the REBA facility. Rehyd produces 300 kA beams of 1.2 MeV electrons with a pulse width of 170 ns. Nominal x-ray exposure dose capabilities of 7 cal/g and 20 to 25 kJ were realized thus far. A description is given of the specific design parameters and facility layouts including the unique features of the REBA Marx generator/Rehyd line energy-transfer system. Diode configurations, magnetic-field applications, and output measurements are also presented

  10. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  11. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  12. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  13. 49 CFR 192.321 - Installation of plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  14. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  15. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  16. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  17. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  18. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  19. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  20. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  1. Research equipment and installations

    International Nuclear Information System (INIS)

    Graf, J.J.; Farny; Destot; Campan; Sabrie

    1987-01-01

    This article gives an information as complete as possible about the activities of the French nuclear industry on the export market. It describes the equipment and services available in the field of research equipement and installations [fr

  2. Installation af opvaskemaskine

    DEFF Research Database (Denmark)

    Christiansen, J.; Skibstrup Eriksen, S.; Nielsen, F.

    Denne SBI-anvisning er et led i en serie om modernisering af installationerne i den ældre boligmasse. Den henvender sig til både beboere, husejere, VVS-installatører og andre interesserede. Anvisningen indeholder almene afsnit om valg og placering af opvaskemaskine, sagsforløb ved installation......, forhold til myndigheder, priser, finansieringsmuligheder m.m. Anvisningen indeholder endvidere tekniske afsnit om vandinstallation, afløb og elinstallation i forbindelse med installation af opvaskemaskine....

  3. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  4. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  5. Cable line engineering

    International Nuclear Information System (INIS)

    Jang, Hak Sin; Kim, Sin Yeong

    1998-02-01

    This book is about cable line engineering. It is comprised of nine chapters, which deals with summary of cable communication such as way, process of cable communication and optical communication, Line constant of transmission on primary constant, reflection and crosstalk, communication cable line of types like flat cable, coaxial cable and loaded cable, Install of communication line with types and facility of aerial line, construction method of communication line facility, Measurement of communication line, Carrier communication of summary, PCM communication with Introduction, regeneration relay system sampling and quantization and Electric communication service and general information network with mobile communication technique and satellite communication system.

  6. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  7. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    contributes to the understanding of the distinctive characteristics of such a new medium, and identifies three strategies for designing 3-D projection installations: establishing space; interplay between the digital and the physical; and transformation of materiality. The principal empirical case, From......Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article...

  8. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  9. Mechanical Behaviour of Lined Pipe

    NARCIS (Netherlands)

    Hilberink, A.

    2011-01-01

    Installing lined pipe by means of the reeling installation method seems to be an attractive combination, because it provides the opportunity of eliminating the demanding welds from the critical time offshore and instead preparing them onshore. However, reeling of lined pipe is not yet proven

  10. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  11. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meters and regulators: Installation. 192... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a...

  12. 49 CFR 192.359 - Customer meter installations: Operating pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meter installations: Operating pressure... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure...

  13. Nuclear Installations Act 1969

    International Nuclear Information System (INIS)

    1969-01-01

    The purpose of this Act is to amend the Nuclear Installations Act 1965 to bring it into full compliance with the international conventions on nuclear third party liability to which the United Kingdom is a Signatory, namely, the Paris Convention, the Brussels Supplementary Convention and the Vienna Convention. (NEA) [fr

  14. Digital Sculpture Installations

    Science.gov (United States)

    Sherwood, Catherine

    2006-01-01

    This author relates how she came upon the idea of using an image-editing program to virtually install monumental sculptures into real-life landscapes in her desire to bring technology and sculpture together in her art class. In this article, she describes how she made her class create tabletop-sized sculptures and photographs of digital…

  15. Drinking-water supply system of Arbedo-Castione. Replacement of the main water supply line and installation of a small hydropower plant; Sostituzione condotta adduzione sorgenti in valle d'Arbedo e ricupero energetico. Acquedotto di Arbedo-Castione

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2005-07-01

    This report presents the comparative evaluation of variants for the replacement work of the main drinking-water supply line from the Arbedo valley to the community of Arbedo-Castione, southern Switzerland. Three variants include the installation of a small hydropower plant to take advantage of the elevation difference of 340 m between the location of water collection and the water reservoir. The base case only includes the line replacement. The feasibility study includes both a technical and an economical analysis. The average water flow rate is estimated to 12 l/s. The nominal electrical power would be 25 kW. Power production cost is calculated to about 0.09 Swiss francs/kWh. The author concludes that an optimized variant with small hydropower plant would be the best solution, also from the point of view of environmental aspects.

  16. Installing the ALICE detector

    CERN Multimedia

    Maximilien Brice

    2006-01-01

    The huge iron yoke in the cavern at Point 2 in the LHC tunnel is prepared for the installation of the ALICE experiment. The yoke is being reused from the previous L3 experiment that was located at the same point during the LEP project from 1989 to 2000. ALICE will be inserted piece by piece into the cradle where it will be used to study collisions between two beams of lead ions.

  17. SNRIU nuclear installation modifications

    International Nuclear Information System (INIS)

    Goroshanskyi, Andrii

    2013-01-01

    Design stages of Nuclear Instalations (NI): NI design is performed in three stages: • Feasibility study: - Feasibility study is developed on the basis of the customer task for production facilities and linear facilities engineering and transport infrastructure that require detailed study of relevant decisions and identify options for and feasibility of construction. • Design: - The design is developed on the basis of design task, initial data and approved the previous stage under three-stage design. • Detailed documentation

  18. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  19. Installation of the Tritium Purification System

    Energy Technology Data Exchange (ETDEWEB)

    Labik, G.; Golian, T.; Satkofsky, J.; Sichta, P.; Crook, D.; Dudek, L.; Coward, G.; Parsells, R. [Princeton Plasma Physics Lab., NJ (United States)

    1995-12-31

    This paper describes and details the design, the tasks, and the considerations for the mechanical and electrical installation of the TFTR Tritium Purification System (TPS) at the Princeton Plasma Physics Laboratory (PPPL). Canadian Fusion Fuels Technology Project (CFFTP) designed, fabricated, assembled and tested the Tritium Purification System in Ontario, Canada. After system tests were accepted by Princeton Plasma Physics Laboratory, the assembled components were disassembled into a set of subassemblies and were shipped to PPPL. The subassemblies were reassembled at PPPL and installed primarily in the Decon Facility. The original site selection was within the TFTR tritium processing area and that selection impacted the column design. The Decon Facility was later chosen to permit a better layout of equipment and improved access for installation personnel. Selection of the Decon Facility site resulted in longer line runs for most of the process streams including the tritium product line. The initial review of the proposed installation was conducted during September of 1994 and the System Integrated Test began during April 1995, subsequent to a successful Operational Readiness Assessment conducted during March of 1995.

  20. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  1. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  2. Decommissioning nuclear installations

    International Nuclear Information System (INIS)

    Dadoumont, J.

    2010-01-01

    When a nuclear installation is permanently shut down, it is crucial to completely dismantle and decontaminate it on account of radiological safety. The expertise that SCK-CEN has built up in the decommissioning operation of its own BR3 reactor is now available nationally and internationally. Last year SCK-CEN played an important role in the newly started dismantling and decontamination of the MOX plant (Mixed Oxide) of Belgonucleaire in Dessel, and the decommissioning of the university research reactor Thetis in Ghent.

  3. Worldwide installed geothermal power

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    Worldwide electric energy production data are easy to compile, according to the informations given by individual countries. On the contrary, thermal applications of geothermics are difficult to quantify due to the variety of applications and the number of countries concerned. Exhaustive informations sometimes cannot be obtained from huge countries (China, Russia..) because of data centralization problems or not exploitable data transmission. Therefore, installed power data for geothermal heat production are given for 26 countries over the 57 that have answered the International Geothermal Association questionnaire. (J.S.). 1 fig., 2 tabs., 1 photo

  4. Wireless installation standard

    International Nuclear Information System (INIS)

    Lim, Hwang Bin

    2007-12-01

    This is divided six parts which are radio regulation law on securing of radio resource, use of radio resource, protection of radio resource, radio regulation enforcement ordinance with securing, distribution and assignment of radio regulation, radio regulation enforcement regulation on utility of radio resource and technical qualification examination, a wireless installation regulation of technique standard and safety facility standard, radio regulation such as certification regulation of information communicative machines and regulation of radio station on compliance of signal security, radio equipment in radio station, standard frequency station and emergency communication.

  5. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  6. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  7. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  8. Installing Python Modules with pip

    Directory of Open Access Journals (Sweden)

    Fred Gibbs

    2013-05-01

    Full Text Available This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common.

  9. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  10. 40 CFR 1060.130 - What installation instructions must I give to equipment manufacturers?

    Science.gov (United States)

    2010-07-01

    ... instructions must I give to equipment manufacturers? (a) If you sell a certified fuel-system component for... EPA Low-Emission Fuel Lines, tell equipment manufacturers not to install the fuel lines with Large SI engines that operate on gasoline or another volatile liquid fuel. (4) Describe instructions for installing...

  11. Automated eddy-current installation AVD-01 for detecting flaws in fuel element cans

    International Nuclear Information System (INIS)

    Varvaritsa, V.P.; Martishchenko, L.G.; Popov, V.K.; Romanov, M.L.; Shlepnev, I.O.; Shmatok, V.P.

    1986-01-01

    This paper describes an automated installation for eddy-current flaw detection in thin-walled pipes with small diameter; its unified transport system makes it possible to use the installation in inspection lines and production lines of fuel elements. The article describes the structural diagrams of the installation and presents the results of investigations connected with the selection for establishing the optimum regimes and sensitivity of feedthrough transducers with focusing screens

  12. Basic electrical installation work level 2

    CERN Document Server

    Linsley, Trevor

    2015-01-01

    Everything needed to pass the first part of the City & Guilds 2365 Diploma in Electrical InstallationsUpdated in line with the 3rd Amendment of the 17th Edition IET Wiring Regulations, this new edition covers the City & Guilds 2365-02 course. Written in an accessible style with a chapter dedicated to each unit of the syllabus, this book helps you to master each topic before moving on to the next. End of chapter revision questions enable learners to check their understanding and consolidate key concepts learnt in each chapter. With a companion website containing videos, animations, worksheets a

  13. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  14. Offshore structure and installation method

    Energy Technology Data Exchange (ETDEWEB)

    Waddell, J.W.

    1992-12-23

    An offshore structure particularly for use in arctic environments, and a method for installing this structure comprises a shield portion which rests on a seabed and primarily resists environmental loads, such as from ice, and a separate support portion which comprises a plurality of piles driven into the seabed to support a deck payload. The method for installing the structure comprises moving a shield portion of the structure to its intended location with piles pre-installed therein; setting the structure on the seabed; driving the piles into the seabed; and then severing any connection between the piles and the shield portion. (Author)

  15. Installation Restoration Program Records Search for Alaska DEW Line Stations

    Science.gov (United States)

    1982-06-01

    equipment include 1-1-1 trichlorethane , dichlorethane, methyl ethyl ketone, trichlorethylene, and acetone. Waste solvents are now drummed and shipped...carbon tetrachloride) but 1-1-1 trichlorethane is now probably the most commonly used (based on examinations of stock supply). Waste solvents are drummed...Florida. Predicted S02 and NOx air emission impacts on vegetation for a proposed caprolactam facility in southern Alabama. Contributed to preliminary

  16. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  17. Installation of the Gbar LINAC

    CERN Multimedia

    Maximilien, Brice

    2017-01-01

    Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

  18. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  19. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  20. Installment options close to expiry

    Directory of Open Access Journals (Sweden)

    G. Alobaidi

    2006-01-01

    Full Text Available We use an asymptotic expansion to study the behavior of installment options close to expiry. Installment options are contracts where the price is paid over the life of the option rather than as a lump sum at the time of purchase, and where the contract can be allowed to lapse at any time. Series solutions are obtained for the location of the free boundary and the price of the option.

  1. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  2. The Offshore Bucket Trail Installation

    DEFF Research Database (Denmark)

    Nielsen, Søren Andreas; Ibsen, Lars Bo

    The Bucket Trail Installation project has gathered a substantial amount of date in a unique soil database which enable update of the used standards for penetration prediction. This update will lead to less conservative design of bucket foundations and is vital for the aim of cost reduction...... in the offshore wind business. Furthermore is serial offshore operation with the bucket concept was demonstrated with achieving full installation depth and inclination within given tolerance....

  3. Countering Terrorism on Military Installations

    Science.gov (United States)

    1977-07-29

    enforcement purposes. Installation Provost Marshal should review the installation Tables of Distribucion and Allowances to determine commercial items of law...few perpetrators with inexpensive small arms can create disruptions affecting whole natinns. The degree of fear instilled by terror normally parallels...other than basic arms during operations - normally rifles and light automatic weapons, hand grenades and simple explosives. These have included - * U.S

  4. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  5. 46 CFR 183.392 - Radiotelephone installations.

    Science.gov (United States)

    2010-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...

  6. Licensing Process for Nuclear Installations

    International Nuclear Information System (INIS)

    2011-01-01

    This Safety Guide describes how the licensing process should be applied at the various stages of the lifetime of a nuclear installation, with discussion of topics and required documents to be considered at each stage. Recommendations on the application by a regulatory body of a graded approach in the licensing process are also provided. It also describes the processes that should be undertaken to meet the regulatory and legal requirements in a Member State to authorize the establishment of a nuclear installation and/or initiation of its activities. While this Safety Guide focuses on safety at nuclear installations, it is noted that integration of safety and security aspects should be considered and evaluated by the regulatory body in the licensing process. Contents: 1. Introduction; 2. General recommendations for the licensing process; 3. Steps of the licensing process; Appendix I: Examples of documents to be submitted to the regulatory body.

  7. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  8. Deformation Detection in Piping Installations Using Profiling Techniques

    Science.gov (United States)

    Mapurisa, W. T.; Sithole, G.

    2012-07-01

    As-Built surveys of buildings and installations have received greater attention in recent years. An example is the 3D digital reconstruction of existing piping installations at chemical plants for plant maintenance, upgrades and safety standard concerns. This paper is directed at the reconstruction of piping installations with particular emphasis on the detection of deformities in pipes. Reconstruction begins with the automatic detection of individual piping elements which requires a prior segmentation. For segmentation, the profile intersection technique is used. Surfaces are considered as a network of intersecting curves as opposed to surface patches. Recreating such curves on a point set, and intersecting them, segments are identified. The entire scan is partitioned into a series of scan planes referred to as profiles. Points are then connected in each profile based on the surface they represent forming line segments. The line segments, which represent curves, are then intersected to identify segments. For pipes, line segments are elliptical. The centre of an ellipse lies on the pipes' axis and the semi minor axis is equivalent to the radius of the pipe. Therefore together the centres and semi minor axis are used to describe the position, orientation, size and radius of a pipe. For deformed pipes, the line segments deviate from the elliptical shape. By identifying deviations of the line segments from the elliptical shape deformations are identified. The algorithm allows for cylinders, spheres, cones and tori to be detected including deformities in their shape. Experimental results show the effectiveness of the algorithm.

  9. DEFORMATION DETECTION IN PIPING INSTALLATIONS USING PROFILING TECHNIQUES

    Directory of Open Access Journals (Sweden)

    W. T. Mapurisa

    2012-07-01

    Full Text Available As-Built surveys of buildings and installations have received greater attention in recent years. An example is the 3D digital reconstruction of existing piping installations at chemical plants for plant maintenance, upgrades and safety standard concerns. This paper is directed at the reconstruction of piping installations with particular emphasis on the detection of deformities in pipes. Reconstruction begins with the automatic detection of individual piping elements which requires a prior segmentation. For segmentation, the profile intersection technique is used. Surfaces are considered as a network of intersecting curves as opposed to surface patches. Recreating such curves on a point set, and intersecting them, segments are identified. The entire scan is partitioned into a series of scan planes referred to as profiles. Points are then connected in each profile based on the surface they represent forming line segments. The line segments, which represent curves, are then intersected to identify segments. For pipes, line segments are elliptical. The centre of an ellipse lies on the pipes’ axis and the semi minor axis is equivalent to the radius of the pipe. Therefore together the centres and semi minor axis are used to describe the position, orientation, size and radius of a pipe. For deformed pipes, the line segments deviate from the elliptical shape. By identifying deviations of the line segments from the elliptical shape deformations are identified. The algorithm allows for cylinders, spheres, cones and tori to be detected including deformities in their shape. Experimental results show the effectiveness of the algorithm.

  10. Going Dotty: a practical guide for installing new hand hygiene products.

    Science.gov (United States)

    Bush, Kathryn; Mah, Manuel W; Meyers, Gwyneth; Armstrong, Pamela; Stoesz, Janice; Strople, Sally

    2007-12-01

    This report distills our experiences coordinating the installation of a new commercial line of hand hygiene products in a large, integrated health care region in Western Canada into a practical guide that can benefit infection control professionals. Some key considerations while managing such a large hand hygiene products installation are stakeholder collaboration, management of occupational hand dermatitis, housekeeping support, and communication.

  11. Ultrasonic data acquisition installation for basis and in-service testing of nuclear pressure vessels

    International Nuclear Information System (INIS)

    Gutmann, G.; Engl, G.

    1976-01-01

    The safety of nuclear installations requires continuous safety inspections during construction and operation. Essential parts of this safety inspection are the basis and in-line inspections. For this purpose installation systems are used which allow an optimal statement to be made regarding the conditions of tested components

  12. SUB-SLAB PROBE INSTALLATION

    Science.gov (United States)

    Sub-slab sampling has become an integral part of vapor intrusion investigations. It is now recommended in guidance documents developed by EPA and most states. A method for sub-slab probe installation was devised in 2002, presented at conferences through 2005, and finally docume...

  13. Installation tests for BERSAFE 88

    International Nuclear Information System (INIS)

    Bamfield, R.D.; Haigh, R.

    1989-02-01

    A set of ten test problems for each of the four BERSAFE stress analysis programs is provided. These problems along with this report, which forms part of the BERSAFE 88 documentation, constitute a test of the customers' BERSAFE installation. On running the problems and attaining results identical to those presented here, the customer should have some confidence that his system is operating correctly. (author)

  14. YB0 SERVICES INSTALLATION COMPLETED

    CERN Document Server

    The beauty of the completed YB0 was briefly visible at P5 as preparations continue for Tracker installation. A tremendous effort, lasting 7 months and involving more than 100 workers on the busiest days, resulted in 5700 electrical cables, 780 optical cables with 65k fibre channels, and 550 pipes laid on YB0 for HB, EB and Tracker.

  15. Horn installed in CNGS tunnel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The horn is installed for the CERN Neutrinos to Gran Sasso (CNGS) project. Protons collide with a graphite target producing charged particles that are focussed by the magnetic field in the horn. These particles will then pass into a decay tube where they decay into neutrinos, which travel towards a detector at Gran Sasso 732 km away in Italy.

  16. Nuclear Plant Analyzer: Installation manual. Volume 1

    International Nuclear Information System (INIS)

    Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R.

    1995-01-01

    This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays

  17. 30 CFR 56.4501 - Fuel lines.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuel lines. 56.4501 Section 56.4501 Mineral... Installation/construction/maintenance § 56.4501 Fuel lines. Fuel lines shall be equipped with valves capable of stopping the flow of fuel at the source and shall be located and maintained to minimize fire hazards. This...

  18. 30 CFR 57.4501 - Fuel lines.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuel lines. 57.4501 Section 57.4501 Mineral... Installation/construction/maintenance § 57.4501 Fuel lines. Fuel lines shall be equipped with valves capable of stopping the flow of fuel at the source and shall be located and maintained to minimize fire hazards. This...

  19. The dismantling of nuclear installations; Le demantelement des installations nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    Lacoste, A.C.; Duthe, M.; Mignon, H. [Ministere de l`Industrie, des Postes et Telecommunications et du Commerce Exterieur, 75-Paris (France). Direction de la Surete des Installations Nucleaires; Charles, Th. [CEA Centre d`Etudes de Fontenay-aux-Roses, 92 (France). Inst. de Protection et de Surete Nucleaire; Michon, D. [Electricite de France (EDF), 75 - Paris (France); Lambert, F. [Unite de demantelement des installations nucleaires (UDIN), CEA (France); Pradel, Ph. [Compagnie Generale de Matieres Nucleaires (COGEMA), 30 - Bagnols-sur-Ceze (France). Etablissement de Marcoule; Vergne, C. [CODEM Groupement d`interet economique (France); Hillewaere, J.P.; Dupre la Tour, St. [DRIRE Nord-Pas-de-Calais (France); Mandil, C. [Ministere de l`Economie, des Finances et de l`Industrie (France); Weil, L.; Eickelpasch, N.; Finsterwalder, L. [Office Federal de radioprotection, (Germany)

    1997-10-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of `Controle`to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  20. Engineering report for simulated riser installation

    Energy Technology Data Exchange (ETDEWEB)

    Brevick, C.H., Westinghouse Hanford

    1996-05-09

    The simulated riser installation field tests demonstrated that new access ports (risers) can be installed safely, quickly, and economically in the concrete domes of existing underground single- shell waste storage tanks by utilizing proven rotary drilling equipment and vacuum excavation techniques. The new riser installation will seal against water intrusion, provide as table riser anchored to the tank dome, and be installed in accordance with ALARA principles. The information contained in the report will apply to actual riser installation activity in the future.

  1. Quality assurance in nuclear installations

    International Nuclear Information System (INIS)

    Torres M, Nelson.

    1985-08-01

    It has been proven that the bad quality of products, equipment, installations, and services is not due to the lack of tests, experiments and verifications. The main causes are associated with insufficient organization of the activities that have influence on the quality. The garantee of quality is conceptualized as an appropriate instrument composed of normalized criteria initially in advanced technologies. Such as nuclear science and aerospace technology. However, with the appropriate modifications it can be applied to conventional technologies

  2. Mounting clips for panel installation

    Science.gov (United States)

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  3. Simplified installation of thrust bearings

    Science.gov (United States)

    Sensenbaugh, N. D.

    1980-01-01

    Special handling sleeve, key to method of installing thrust bearings, was developed for assembling bearings on shaft of low-pressure oxygen turbo-pump. Method eliminates cooling and vacuum-drying steps which saves time, while also eliminating possibility of corrosion formation. Procedure saves energy because it requires no liquid nitrogen for cooling shaft and no natural gas or electric power for operating vacuum oven.

  4. Installation of LHC experimental areas

    CERN Document Server

    Butin, F; Lacarrère, D; Osborne, J; CERN. Geneva. TS Department

    2005-01-01

    Following handover by the civil engineering contractors, the new LHC experimental areas are being fitted-out with appropriate infrastructure and technical services. In parallel, and in order to make up for the short time available, the installation of the detectors has already started in the experimental caverns. In addition, the LHC machine installation now has a non-negligible impact on the experimental area activities. Four Experimental Area Teams have been set up in order to coordinate all this work, organize the logistic resources and ensure the proper safety of personnel and material. This paper will focus on the status of installation in all areas and define the technical challenges coming in the next months. Illustrations from the new areas at Point 1 and Point 5 will be presented and compared to those from existing areas at Point 2 and Point 8, custom built for and inherited from LEP. The successes and difficulties encountered so far will be reviewed and the conclusions that have been drawn from this...

  5. Installed capacity in New York

    International Nuclear Information System (INIS)

    Charlton, J.

    2006-01-01

    This presentation discussed capacity issues related to the New York Independent System Operator (NYISO). The NYISO's market volume was approximately $11 billion in 2005, and it was responsible for providing 32,075 MW of electricity at peak load to its users. Regulatory uncertainty is currently discouraging investment in new generating resources. All load serving entities are required to contract for sufficient capacity in order to meet their capacity obligations. Market participants currently determine capacity and energy revenues. The NYISO market allows suppliers to recover variable costs for providing ancillary services, and the economic value of the revenue source governs decisions made in the wholesale electricity market. The installed capacity market was designed as a spot auction deficiency auction. Phased-in demand curves are used to modify the installed capacity market's design. A sloped demand curve mechanism is used to value capacity above the minimum requirement for both reliability and competition. Participation in the day-ahead market enhances competition and exerts downward pressure on energy and ancillary service market prices. It was concluded that the market structures and design features of the installed capacity markets recognize the need for system reliability in addition to encouraging robust competition and recognizing energy price caps and regulatory oversights. tabs., figs

  6. Leukaemia near british nuclear installations

    International Nuclear Information System (INIS)

    Hubert, D.

    1991-01-01

    An excess of childhood leukaemia has been seen near some British nuclear installations, especially near the Sellafield reprocessing plant. The same result was found in a more general study including a large number of nuclear sites. Similar studies made in USA, Canada and France have been negative. Moreover, epidemiological studies made in England have discovered other childhood leukaemia clusters in areas far from nuclear facilities, and especially near potential sites of nuclear installations. Several explanations are suggested but no definite conclusion is yet possible. Doses from radioactive releases seem to be too low to account for the additional deaths from leukaemia by environmental contamination. A virus activation, which might be associated with population influx into rural isolated areas, has been considered. The hypothesis of genetic mutation induced by ionising radiation in the fathers of children with leukaemia has been made because a higher risk of leukaemia was observed for children of fathers employed at Sellafield. No firm conclusion is possible considering the small number of observed cases and the lack of excess leukaemias in the offspring of Hiroshima and Nagasaki survivors. The possibility of internal contamination, chemicals or even radon is discussed as other causes. Studies in progress might allow to find an answer to the problem of leukaemia in the vicinity of British nuclear installations [fr

  7. Physical installation of Pelletron and electron cooling system

    International Nuclear Information System (INIS)

    Hurh, P.

    1997-01-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here

  8. 46 CFR 120.392 - Radiotelephone installations.

    Science.gov (United States)

    2010-10-01

    ... INSTALLATION Power Sources and Distribution Systems § 120.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided for each radiotelephone...

  9. 46 CFR 120.354 - Battery installations.

    Science.gov (United States)

    2010-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery...

  10. Utility installation review system : implementation report.

    Science.gov (United States)

    2009-03-01

    Each year, the Texas Department of Transportation (TxDOT) issues thousands of approvals that enable new : utility installations to occupy the state right of way (ROW). The current utility installation review process : relies on the physical delivery ...

  11. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  12. The security of nuclear installations

    International Nuclear Information System (INIS)

    Laponche, Bernard; Marignac, Yves

    2011-12-01

    The authors first describe and discuss the operation principle of a nuclear reactor, and the distinction between a major and severe nuclear accident. They outline that a major nuclear accident is far from being unlikely. They also comment and discuss the context of nuclear installations and nuclear fuel fabrication factories and their associated risks, and do the same for nuclear waste processing activities. Then, they address three specific issues: the use of MOX, the nuclear power plant and reactor lifetime, and the EPR reactor. They finally outline some limitations of the ESC (additional safety assessment) approach, and discuss the first lessons learned from this approach

  13. Designing Software-Based Interactive Installations

    DEFF Research Database (Denmark)

    Andreasen, Troels; Juul, Niels Christian; Rosendahl, Mads

    2014-01-01

    installations and support the description of the approach with a single case- a bumper car competition. Why. To some extent, standard techniques for software development can be adapted for interactive installations. However, there is a need to emphasize the unique aspects of installations, bringing tangible...

  14. Sprinkler System Installer. Occupational Analyses Series.

    Science.gov (United States)

    Chinien, Chris; Boutin, France

    This analysis covers tasks performed by a sprinkler system installer, an occupational title some provinces and territories of Canada have also identified as pipefitter--fire protection mechanic specialty; sprinkler and fire protection installer; sprinkler and fire protection systems installer; and sprinkler fitter. A guide to analysis discusses…

  15. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads for main and booster fans, and air ducts connecting main fans to underground openings shall be...

  16. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    the suction assisted installation process. In this thesis, the phenomenon of buckling of the bucket foundation during installation is investigated by means of Finite Element Analysis. The influence of boundary conditions on the bucket foundation is adressed as well as the effect of including the surrounding...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation......—has been proposed to reduce the foundation costs. The bucket foundation promises to be cheaper as it is both faster to install compared to current technology and it does not require heavy installation equipment. Since the bucket foundation is essentially a relatively thin shell structure subjected to both...

  17. Wind profiler installed in Antarctica

    Science.gov (United States)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  18. NEMP effects on domestic installation

    International Nuclear Information System (INIS)

    Braun, C.; Clemens, P.; Graf, W.; Guidi, P.; Schmidt, H.U.

    1985-01-01

    The measurements have been made in a building of a psychiatric clinic at Alzey/West Germany. The building has been chosen for the measuring campaign because it has its own electrical installation for mains current supply and emergency power supply, apart from systems of the other buildings. The two supply systems DONNERSBERG could be cut off completely from the other mains systems, so that coupling and feed experiments could be made without mains voltage. Current supply to the measuring systems was done by means of extension cables, or by batteries. The wiring for connection to the room circuits is parallel to the exterior wall, so that measurements could be done by using a frame antenna placed outside of the building parallel to the exterior wall. (orig./DG) [de

  19. Installation in the SPS tunnel

    CERN Multimedia

    1974-01-01

    The SPS tunnel is 6910 m in circumference and has a cross section of 4 m inner diameter. It is situated at an elevation of 400 m above sea level at a depth below the surface varying between 23 and 65 m. Its walls are lined with a concrete shell of about 30 cm thickness. See also 7410043X

  20. Application studies of line arresters

    Energy Technology Data Exchange (ETDEWEB)

    Zanetta Junior, Luiz Cera; Pereira, Carlos Eduardo de Morais [Sao Paulo Univ., SP (Brazil). Escola Politecnica. Dept. de Engenharia de Energia e Automacao Eletricas]. E-mail: lzanetta@pea.usp.br

    2001-07-01

    This paper presents the main calculations of the line arresters impact on outage rates, by focusing their effects on critical current curves, in presence of the power frequency voltage. The present critical results obtained will help in the understanding of some variables during the outrage calculations. Energy stresses on arresters due to first stroke are also evaluated in function of tower foot resistance. The transmission line studied, has a shielded 138 kV line configuration, single circuit typical of Brazilian SE region. The alternative with Zn O arresters consider their installation at every tower, in the two lower phases b and c. (author)

  1. Status of ACCULINNA beam line

    CERN Document Server

    Rodin, A M; Bogdanov, D D; Golovkov, M S; Fomichev, A S; Sidorchuk, S I; Slepnev, R S; Wolski, R; Ter-Akopian, G M; Oganessian, Yu T; Yukhimchuk, A A; Perevozchikov, V V; Vinogradov, Yu I; Grishenchkin, S K; Demin, A M; Zlatoustovskii, S V; Kuryakin, A V; Filchagin, S V; Ilkaev, R I

    2003-01-01

    The separator ACCULINNA was upgraded to achieve new experimental requirements. The beam line was extended by new ion-optical elements beyond the cyclotron hall. The new arrangements yield much better background conditions. The intensities of sup 6 He and sup 8 He radioactive beams produced in fragmentation of 35 A MeV sup 1 sup 1 B ions were increased up to a factor of 10. The upgraded beam line was used in experiments to study the sup 5 H resonance states populated in the t+t reaction. A cryogenic liquid tritium target was designed and installed at the separator beam line.

  2. Modern electrical installation for craft students

    CERN Document Server

    Scaddan, Brian

    2013-01-01

    Modern Electrical Installation for Craft Students, Volume 2, Third Edition discusses several topics concerning electrical installations. The book is comprised of eight chapters that deal with craft theory, associated subjects, and electrical industries. Chapter 1 covers inductors and inductance, while Chapter 2 tackles capacitors and capacitance. Chapter 3 deals with inductance and capacitance in installation work. The book also discusses cells, batteries, and transformers. The electrical industries, control and earthing, and testing are also dealt with. The last chapter discusses the basic el

  3. Civilian protection and Britain's commercial nuclear installations

    International Nuclear Information System (INIS)

    1981-01-01

    The subject is treated as follows: initial conclusions (major nuclear attack on military installations; nuclear attack including civil nuclear targets; conventional attack on civil nuclear installations); nature of nuclear weapons explosions and power reactor releases (general; dose effects and biologically significant isotopes; nuclear weapon effects; effect of reactors and other fuel-cycle installations in a thermonuclear area; implications of reactor releases due to conventional attack, sabotage, civil disorder or major accident). (U.K.)

  4. Installation of radiodiagnosis with sweep

    Energy Technology Data Exchange (ETDEWEB)

    Birzu, I.; Catuneanu, V.; Patrascu, S.; Teisanu, E.; Voinea, M. I.; Voinea, V.

    1980-11-18

    The installation according to the invention practically eliminates the total irradiation of the radiologic examinated persons, using an X radiations source, which produces a swept filiform beam, synchronized with the sweep of a T.V. Monitor. In this way the useless irradiation of the entire examined surface is avoided with a strict exception of a single image point useful at one given moment, image point which is transmitted to the T.V. Monitor. There are given more achievement variants of the swept filiform beam, as: radioopaques screens with punctiform orifices or slits and radiodiagnosis tubes with swept emission point of the X radiation associated with antidiffusion grids which turn the swept X radiations beam into a swept filiform X radiations beam. The radiodiagnosis tube with swept emission point of the X radiations is utilized also for the achievement of a tomoscopy or an electronic tomography with the wipe in surface. In this purpose the desirable plane of the examinated object is selected by adjustment of the sweep on the T.V. Monitor by means of a supplementary deflexion system.

  5. ID Barrel installed in cryostat

    CERN Document Server

    Apsimon, R.; Romaniouk, A.

    Wednesday 23rd August was a memorable day for the Inner Detector community as they witnessed the transport and installation of the central part of the inner detector (ID-barrel) into the ATLAS detector. Many members of the collaboration gathered to witness this moment at Point 1. After years of design, construction and commissioning, the outer two detectors (TRT and SCT) of the ID barrel were moved from the SR1 cleanroom to the ATLAS cavern. The barrel was moved across the car park from building 2175 to SX1. Although only a journey of about 100 metres, this required weeks of planning and some degree of luck as far as the weather was concerned. Accelerometers were fitted to the barrel to provide real-time monitoring and no values greater than 0.1 g were recorded, fully satisfying the transport specification for this extremely precise and fragile detector. Muriel, despite her fear of heights, bravely volunteered to keep a close eye on the detector. Swapping cranes to cross the entire parking lot, while Mur...

  6. ALARA in European nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Lefaure, C. [CEPN, Fontenay-Aux-Roses (France); Croft, J. [NRPB, Chilton, Didcot (United Kingdom); Pfeffer, W. [GRS, Koeln (Germany); Zeevaert, T. [SCK/CEN, Mol (Belgium)

    1995-03-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe.

  7. Spectrometric assembly for portable installations

    International Nuclear Information System (INIS)

    Kluger, A.; Popescu, C.

    1997-01-01

    The components of the portable spectrometric assembly are: - the detecting probe with Na I(Tl) crystal and air-tight case of industrial type; - a microcomputer; - a unit of analogical processing of the signal from the detecting probe; - a single-channel analyzer with adjustable threshold; - commands and display module; - a source of high voltage; - an electrical supply battery. The device uses the method of gamma photons detection in energetic windows. Through theoretical and experimental studies carried out during the prototype development phase, the superiority of this method has been proved as compared with the installations which make use of the classical principle of photon integral detection. The achieved prototype has a basic program enabling the setting of all working parameters (measuring time, discriminating thresholds, discriminators operating conditions, etc.). Through the included interface RS232 it is possible to transmit the data to a more powerful computer in order to continually process the results. The spectrometric assembly, realized on the basis of micro-computers, can be used in a wide range of applications: measurement of thickness and erosion of walls and tubes, measurement of level in closed containers, of soil density, etc. The adjustment for specific application is performed only through a program modification. (authors)

  8. Automated installation for atomic emission determination of gold, silver and platinum group metals

    International Nuclear Information System (INIS)

    Zayakina, S.B.; Anoshin, G.N.; Gerasimov, P.A.; Smirnov, A.V.

    1999-01-01

    An automated installation for the direct atomic emission determination of silver, gold and platinum-group metals (Ru) in geological and geochemical materials with software for automated data acquisition and handling is designed and developed. The installation consists of a DFS-458 diffraction spectrograph, a MAES-10 multichannel analyzer of emission spectra, and a dual-jet plasmatron. A library of spectral lines of almost all elements excited in the dual-jet plasmatron is complied [ru

  9. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  10. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  11. A safe system for a heavy water detritiation installation

    International Nuclear Information System (INIS)

    Balteanu, Ovidiu; Retevoi, Carmen; Stefan, Iuliana

    2003-01-01

    In the heavy water circuit of a CANDU reactor tritium is generated by the following mechanisms: - neutron activation; - fission of 235 U, 233 U and 239 Pu in uranium rods; 3 He decay. The equilibrium value is about 30-50 Ci/kg, depending on the amount of heavy water common to the primary and moderate circuit, at a raising rate of 4 Ci/kg/year. As the tritium inventory in the reactor can reach 6 x 10 6 Ci (as tritium oxide in the heavy water circuits) it results that a detritiation installation is necessary. In order to solve the problem the installation should be linked to the moderator circuit of the reactor. This installation could be considered a nuclear facility with safety rules and systems complying with the Romanian and international law, including the IAEA Vienna guide lines. As with any nuclear facility, a special safety system is provided having special hardware and software components to supervise the technological process and the safety equipment operation. Conventional systems make use of numerous and expansive equipment as imposed by reliability and precision requirements. On the other hand the systems become more complex as following the redundancy, diversity and fail-safe requirements. To fulfill these challenges a diagnosis and on-line checking system was developed, implying two computers and a small number of field components. The paper gives the pilot installation layout, the interconnection of the control and safety systems as well as the alarm system for major accident events. The information regarding the operation of installation as well as the data supplied to the operator are essential in making diagnosis, conditioning and prioritization of alarm messages. The system is versatile and easy to handle while improvements required by the technological process can be done in short times at low costs. Such a system can replace dedicated equipment and software platform for industrial application, particularly in our case were many experiments are

  12. Fiber Optics Technology.

    Science.gov (United States)

    Burns, William E.

    1986-01-01

    Discusses various applications of fiber optics technology: information systems, industrial robots, medicine, television, transportation, and training. Types of jobs that will be available with fiber optics training (such as electricians and telephone cable installers and splicers) are examined. (CT)

  13. 46 CFR 111.33-5 - Installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  14. 46 CFR 58.16-18 - Installation.

    Science.gov (United States)

    2010-10-01

    ... RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a) Cylinders... cylinder housing. The enclosure shall be constructed so that when the access opening is closed, no gas can... gas onto a cylinder. (b) Piping. (1) All piping shall be installed so as to provide minimum interior...

  15. Installation Service - Changes in opening hours

    CERN Multimedia

    GS Department

    2010-01-01

    For organizational matters, please note that, as from 15 March 2010, the Installation Service will have wen opening hours. The new schedule will be from 14:00 to 17:00 (Monday to Friday). Contact persons are: Martine Briant, Karine Robert and Claudia Bruggmann. The office address remains 73-3-014. Installation Service

  16. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  17. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  18. A Hadron Radiation Installation and Verification Method

    NARCIS (Netherlands)

    Beekman, F.J.; Bom, V.R.

    2013-01-01

    A hadron radiation installation adapted to subject a target to irradiation by a hadron radiation beam, said installation comprising: - a target support configured to support, preferably immobilize, a target: - a hadron radiation apparatus adapted to emit a hadron radiation beam along a beam axis to

  19. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  20. 14 CFR 23.1061 - Installation.

    Science.gov (United States)

    2010-01-01

    ... any part of the system, except the coolant tank expansion space, during filling or during operation... Installation. (a) General. Each liquid-cooled engine must have an independent cooling system (including coolant tank) installed so that— (1) Each coolant tank is supported so that tank loads are distributed over a...

  1. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  2. Seismic qualification of existing nuclear installations in India - a proposal

    International Nuclear Information System (INIS)

    Basu, P.C.

    2001-01-01

    In India, the work toward seismic qualification of existing nuclear facilities has been started. Preliminary work is being undertaken with respect to identifying the facilities which would be taken up for seismic qualification, approach and methodology for re-evaluation for seismic safety, acceptance criteria, etc. Work has also been started for framing up the criteria and methodology of the seismic qualification of these facilities. Present paper contains the proposal in this respect. This proposal is on similar lines of the present practice of seismic qualification of NPP, as summarized in the Appendix, but has been modified to suit the special requirements of Indian nuclear installations. (author)

  3. Public perception of nuclear installations

    International Nuclear Information System (INIS)

    Kiipper, Felipe de Moura

    2011-01-01

    The key for nuclear renaissance is public acceptance. Facing energetic needs that occur around the world and lack of resources, the work of characterizing and proposing new models to represent public opinion is extremely important to all stakeholders. Even though public opinion's study on risks is relatively recent, may approaches of this subject have been suggested and presented, especially for the topic of perceptions on nuclear installations. Actual definitions on risk exist between objective and subjective models, that reflect opinions of lay public and experts. Strategies on communications with the public may be evaluated from many developed models, and its results may be registered. The use of structural models may present an exploratory character as well as confirmatory theories, as an adequate tool for the development of studies on public perception. In this work, a structural model is presented from data obtained in a previous report, and added to data collected before and after the Fukushima nuclear accident, in Japan. The effects developed from this accident offered a unique opportunity to study public opinion through the effects of a serious nuclear accident and its effects on risk communications. Aside, this work attempted to check the structural model according with obtained results, in order to sustain a constant improvement of the working tools. Yet, a comparison between data according to experts' respondents and lay public ones as well as a comparison among different students before and after a visit to nuclear station is considered. Obtained data for the structural models has been applied for on a structural model and analyzed by structural correlation matrix, latent variable structural coefficients and R 2 values. Results indicate that public opinion maintains its rejection on nuclear energy and the perception of benefits, facing perceived risks before the accident, has diminished. A new model that included a latent variable for corresponding

  4. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  5. 49 CFR 192.375 - Service lines: Plastic.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Service lines: Plastic. 192.375 Section 192.375... § 192.375 Service lines: Plastic. (a) Each plastic service line outside a building must be installed... terminate above ground level and outside the building, if— (i) The above ground level part of the plastic...

  6. 14 CFR 25.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 25.993 Section 25.993 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Fuel system lines and fittings. (a) Each fuel line must be installed and supported to prevent excessive...

  7. 14 CFR 23.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 23.993 Section 23.993 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Fuel System Components § 23.993 Fuel system lines and fittings. (a) Each fuel line must be installed...

  8. 14 CFR 29.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 29.993 Section 29.993 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Fuel system lines and fittings. (a) Each fuel line must be installed and supported to prevent excessive...

  9. 14 CFR 27.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 27.993 Section 27.993 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Fuel system lines and fittings. (a) Each fuel line must be installed and supported to prevent excessive...

  10. 14 CFR 121.231 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel system lines and fittings. 121.231 Section 121.231 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... system lines and fittings. (a) Fuel lines must be installed and supported so as to prevent excessive...

  11. 14 CFR 125.129 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel system lines and fittings. 125.129 Section 125.129 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... Requirements § 125.129 Fuel system lines and fittings. (a) Fuel lines must be installed and supported so as to...

  12. Preliminary installment of total picture archiving and communication systems

    International Nuclear Information System (INIS)

    Takenaka, E.; Takanashi, S.; Suda, Y.; Furui, S.; Yoshida, H.; Hosaka, Y.; Fukui, T.

    1990-01-01

    This paper studied the image quality of various medical digital images and to install a small but total image management and communication system to file images. The system consists of a filing system with a laser scanning digitizer (2,000 x 2,000 x 8 bits), an optical disk (3.8 GB), two HD CRTs, and a 1.6 GB magnetic disk. This system can file on-line the images from a second filing system with FCR (on-line) and a Konica direct imaging system during treatment and follow-up, a CCD TV simulator system for a remote after-loading system, a dose map on CT and MR images through a self-made treatment planning system on the PC level, a CCD TV (RGB) system for local lesions, and portal images, through the imaging plate, for brachytherapy

  13. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  14. Seismic studies for nuclear installations sites

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Faure, J.

    1988-01-01

    The french experience in seismic risks assessment for french nuclear installations permits to set out the objectives, the phases the geographic extensions of workings to be realized for the installation safety. The data to be collected for the safety analysis are specified, they concern the regional seismotectonics, the essential seismic data for determining the seism level to be taken into account and defining the soil movement spectra adapted to the site. It is necessary to follow up the seismic surveillance during the installation construction and life. 7 refs. (F.M.)

  15. Instability of Bucket Foundations during Installation

    DEFF Research Database (Denmark)

    Madsen, Søren; Andersen, Lars Vabbersgaard; Ibsen, Lars Bo

    The bucket foundation is an upcoming technology for offshore wind turbines. The bucket foundation is a large cylindrical monopod foundation constructed as a thin steel shell structure. A bucket foundation does not require heavy installation equipment since it is installed by suction forces....... The combination of a thin shell structure and suction forces leads to the fact that instability, in form of buckling, becomes a crucial issue during installation. The hydrostatic buckling pressure of the bucket foundation is addressed using three-dimensional, non-linear finite element analysis. The results...

  16. Installation of deep water sub-sea equipment

    Energy Technology Data Exchange (ETDEWEB)

    Pollack, Jack; Demian, Nabil [SBM-IMODCO Inc., Houston, TX (UNited States)

    2004-07-01

    Offshore oil developments are being planned in water depths exceeding 2000 m. Lowering and positioning large, heavy sub sea hardware, using conventional methods, presents new technical challenges in these ultra deep waters. In 3000 m a safe lift using conventional steel cables will require more capacity to support the cable self weight than the static payload. Adding dynamic loads caused by the motions of the surface vessel can quickly cause the safe capacity of the wire to be exceeded. Synthetic ropes now exist to greatly reduce the lowering line weight. The lower stiffness of these synthetic ropes aggravate the dynamic line tensions due to vessel motions and relatively little is known about the interaction of these ropes on the winches and sheaves required for pay-out and haul-in of these lines under dynamic load. Usage of conventional winches would damage the synthetic rope and risk the hardware being deployed. Reliable and economic installation systems that can operate from existing installation vessels are considered vital for ultra deep-water oil development. The paper describes a Deep Water Sub-Sea Hardware Deployment system consisting of a buoy with variable, pressure-balanced buoyancy, which is used to offset most of the payload weight as it is lowered. The buoyant capacity is controlled by air pumped into the tank from the surface vessel through a reinforced hose. The buoy and payload motion are isolated from the deployment line surface dynamics using a simple passive heave compensator mounted between the buoy and the bottom of the deployment rope. The system components, functionality and dynamic behavior are presented in the paper. (author)

  17. High Line

    DEFF Research Database (Denmark)

    Kiib, Hans

    2015-01-01

    . The High Line project has been carried out as part of an open conversion strategy. The result is a remarkable urban architectural project, which works as a catalyst for the urban development of Western Manhattan. The greater project includes the restoration and reuse of many old industrial buildings......At just over 10 meters above street level, the High Line extends three kilometers through three districts of Southwestern Manhattan in New York. It consists of simple steel construction, and previously served as an elevated rail line connection between Penn Station on 34th Street and the many...... in close proximity to the park bridge and new projects being added to fit the context. The outcome is a conglomeration of non-contemporary urban activities along the High Line, where mechanical workshops, small wholesale stores. etc. mix with new exclusive residential buildings, eminent cafés...

  18. World lines.

    OpenAIRE

    Waser Jürgen; Fuchs Raphael; Ribicic Hrvoje; Schindler Benjamin; Blöschl Günther; Gröller Eduard

    2010-01-01

    In this paper we present World Lines as a novel interactive visualization that provides complete control over multiple heterogeneous simulation runs. In many application areas decisions can only be made by exploring alternative scenarios. The goal of the suggested approach is to support users in this decision making process. In this setting the data domain is extended to a set of alternative worlds where only one outcome will actually happen. World Lines integrate simulation visualization and...

  19. Management of procurement activities in a nuclear installation

    International Nuclear Information System (INIS)

    1996-12-01

    Discussions held within the framework of IAEA regional technical co-operation projects implemented in the Latin America, Asia-Pacific and eastern Europe regions revealed an area of frequent difficulties related to the proper control, by the management of nuclear utilities, of the effective fulfilment of contractual quality and safety requirements. Evaluation of the results of a number of OSART missions has also pointed to a need for improving the control that some utilities exercise on their suppliers. The IAEA was thus prompted to initiate the development of a technical document providing guidance on these subjects. In October 1995, a consultants meeting was convened to determine the target users of the technical document and to develop the scope, contents, structure and the reference material. A first draft was then prepared. An Advisory Group meeting consisting of experts from 17 Members States was held in Vienna in May 1996 to review and complete the draft. The technical document is intended to provide practical guidance on controlling procurement, with supporting information for senior management, line managers and line supervisors in a nuclear installation. Although the guidance is structured to address the needs during the operating stage of a nuclear power plant, much of the material is also applicable to the construction and decommissioning stages and to other nuclear installations. 1 fig

  20. Structural Code Considerations for Solar Rooftop Installations.

    Energy Technology Data Exchange (ETDEWEB)

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  1. RF accelerating unit installed in the PSB

    CERN Multimedia

    CERN PhotoLab

    1972-01-01

    RF accelerating unit installed in the PSB ring between two bending magnets. Cool air from a heat exchanger is injected into the four cavities from the central feeder and the hot air recirculated via the lateral ducts.

  2. Design and Installation of Monitoring Wells Guidance

    Science.gov (United States)

    EPA Region 4 Science and Ecosystem Support Division (SESD) document, from Feb. 18, 2008, that describes procedures, methods, and considerations when designing and installing groundwater monitoring wells to be used for collection of groundwater samples.

  3. Notes on LED Installations in Street Illumination

    Directory of Open Access Journals (Sweden)

    Elisabeta Spunei

    2014-09-01

    Full Text Available The paper presents a study made on choosing LED street lighting installations, such that the quality requirements for exterior artificial lighting are fulfilled. We analyze two types of LED street lighting installations from a technical point of view, together with lighting level and brightness values obtained during the measurements. Following on the field measurements, the lighting quality parameters are calculated, and, for the lighting installation with the best performance, optimal mounting suggestions are made. The optimal quality parameters are calculated by simulations using the Dialux software. The same software and the same light sources we also compute an optimal street lighting by determining the size of the installation that provides the best lighting parameter values.

  4. Design, fabrication and installation of irradiation facilities

    International Nuclear Information System (INIS)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C.

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs

  5. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    axial and latteral pressure during the installation process buckling becomes a crucial design consideration. In 2005, a large wind turbine was to be installed nearshore the harbour in Wilhelmshaven, Germany. The windturbine was never erected since the skirt of the bucket foundation buckled during...... the suction assisted installation process. In this thesis, the phenomenon of buckling of the bucket foundation during installation is investigated by means of Finite Element Analysis. The influence of boundary conditions on the bucket foundation is adressed as well as the effect of including the surrounding...... soil and soil–structure interaction. Investigations are made regarding the buckling incident in Wilhelmshaven and the results are compared to current DNV and Eurocode standards. Finally, analysis of a new design of the cross section with a higher buckling capacity than an equivalent circular cross...

  6. Solar Panel Installations on Existing Structures

    OpenAIRE

    Tim D. Sass; Pe; Leed

    2013-01-01

    The rising price of fossil fuels, government incentives and growing public aware-ness for the need to implement sustainable energy supplies has resulted in a large in-crease in solar panel installations across the country. For many sites the most eco-nomical solar panel installation uses existing, southerly facing rooftops. Adding solar panels to an existing roof typically means increased loads that must be borne by the building-s structural elements. The structural desig...

  7. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  8. A method of installing a reactor container

    International Nuclear Information System (INIS)

    Hayashi, Kenji; Murakawa, Hisao.

    1975-01-01

    Object: To achieve exact installation of a reactor container at a site. Structure: A pole is set upright at the center of a cylindrical base portion, a plurality of beams are disposed around the pole in a radial fashion to form a cone, a plurality of steel plates are mounted successively around the cone through a ring, and the steel plates are welded to each other to assemble and install a reactor container at the same time. (Kamimura, M.)

  9. Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC

    CERN Document Server

    Weisz, S; Foraz, K; Rodríguez-Mateos, F

    2006-01-01

    The running of individual system tests has to fit within tight constraints of the LHC installation planning and of CERN's accelerator activity in general. For instance, the short circuit tests of the power converters that are performed in-situ restrict the possibility to work in neighbouring areas; much in the same way, the cold tests of the cryogenic distribution line involve safety access restrictions that are not compatible with the transport and installation of cryo-magnets or interconnect activities in the sector considered. Still, these individual system tests correspond to milestones that are required to insure that we can continue with the installation of machine elements. This paper reviews the conditions required to perform the individual system tests and describe how the general LHC installation planning is organised to allocate periods for these tests.

  10. Broaching installation for cutting holes in a plate and broaching process

    International Nuclear Information System (INIS)

    Beraudier, D.; Douheret, J.Y.

    1995-01-01

    The installation consists of two lines of broaching with successive actions, each containing a pulling unit and an attachment having their axes of displacement aligned to follow the common work axis. The axes of work of the two broaching lines are separated by a distance at least equal to the diameter of the plate. The two pulling units and the two attachments are placed one on either side of the plate to be broached. 6 figs

  11. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  12. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  13. Department of the Army Installation Restoration Program

    International Nuclear Information System (INIS)

    Anderson, A.W.

    1988-01-01

    The Army's Installation Restoration Program (IRP) was established in 1975 in response to regulatory action at several installations where past disposal practices had caused contamination of streams and groundwater. The need to decontaminate excess Army-owned real estate also was considered in early IRP activities. A variety of site types have been discovered on Army installations. The major site types evaluated to date include: contaminated soil areas, landfills, lagoons, buildings, burning grounds, sumps, pits, storage tanks, sewage treatment plants, storage pads, industrial wastewater treatment plants, and salvage yards. Twenty Army installations have been proposed for or listed on the National Priorities List (NPL). The need for taking action at hazardous waste sites, however, is based on threats they pose to human health, welfare or the environment. Sites do not have to be on the SPL in order to be cleaned up through IRP activities. All of the sites that caused Army installations to be proposed for the NPL are being evaluated and cleaned up. In addition, all Army properties have been or will be assessed and where needed they will be addressed by the IRP

  14. Legionella risk assessment in water installations

    Directory of Open Access Journals (Sweden)

    Paulino Pastor Pérez

    2005-12-01

    Full Text Available Legionelose is an illness produced as a consequence of the inhalation of bacteria of the specie Legionella, which occasionally may colonize some of the water installations of the buildings.This article describes a Legionella risk assessment algorithm particularized for every type of installation covering all the specific characteristics of every piece of equipment, but keeping a common similar structure that allows easiness of use and homogeneous results. This algorithm has been developed by the Experts Commission of the Ministry of Health.The main use of these kind of tools is to minimize as much as possible the subjectivity of the inspectors in the identification and assessment of risks associated to the installations. These types of algorithms are applicable in risks depending on a relative low number of parameters that are somehow easy to control, as it happens in the water installations in the buildings.It has been chosen to develop a global index rated from 0 to 100 (meaning 0 minimum risk and 100 maximum risk distributed in term in three sub indexes, which define the main risk aspects to be taken into account.Structural Index: design.Maintenance Index: maintenance quality.Operational Index: performance of the equipment.Covering all the different aspects of the life of the installations.

  15. On-line sipping test system

    International Nuclear Information System (INIS)

    Parrat, D.

    1991-01-01

    When leaking fuel assembly must be identified during routine performance of core unloading sequences, PWR utilities use some systems like sipping test equipments, ultrasonic detection or eddy current control. For this purpose, FRAGEMA proposes, the on-line sipping test system, of which process is patented by CEA. This system is installed on the refuelling machine in the reactor fuel building. This one-line system detect leaking fuel assembly during the fuel handling operation and, it provides a significant refuelling outage time saving, unlike the other systems. In addition, the system installation and exploitation present more facilities: Mast equipments installed on the machine without mechanical structure modification, only two days are necessary for the first erection, and it's a self-contained equipment (no additional operator required for driving the system)

  16. 29 CFR 1926.955 - Overhead lines.

    Science.gov (United States)

    2010-07-01

    ... installing or removing wire or cable, strains to which poles and structures will be subjected shall be... being strung in or removed shall be kept under positive control by the use of adequate tension reels... adjacent to energized lines the tension stringing method or other methods which preclude unintentional...

  17. Listed installations for environmental protection in hospitals

    International Nuclear Information System (INIS)

    Mullot, J.U.; Chaulet, J.F.; Thual, A.; Lafon, M.

    1999-01-01

    This work deals with the implications of different French rules and regulations concerning the environmental protection in hospitals. A special place is given to listed installations for environmental protection, because of their importance. A summary of important regulatory texts is presented concerning these installations, and also an inventory of installations or activities concerned, and the definition of the necessary procedures. Some ideas are also given about the much needed creation of an 'environmental network' inside hospitals, in order to cope with these concerns. Then, we briefly deal with more recent developments concerning the environmental protection, which will, no doubt, extend to hospitals, such as the French water law, air law, and procedures for the management of medical waste. Finally, the stakes of environmental decisions in hospitals and the chemist's place in these decisions are debated. (authors)

  18. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  19. Study on installation of the submersible mixer

    International Nuclear Information System (INIS)

    Tian, F; Shi, W D; He, X H; Xu, Y H; Jiang, H

    2013-01-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice

  20. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  1. Installation Strategy for the LHC Main Dipoles

    CERN Multimedia

    Fartoukh, Stephane David

    2004-01-01

    All positions in the LHC machine are not equivalent in terms of beam requirements on the geometry and the field quality of the main dipoles. In the presence of slightly or strongly out-of tolerance magnets, a well-defined installation strategy will therefore contribute to preserve or even optimize the performance of the machine. Based on the present status of the production, we have anticipated a list of potential issues (geometry, transfer function, field direction and random b3) which, combined by order of priority, have been taken into account to define a simple but efficient installation algorithm for the LHC main dipoles. Its output is a prescription for installing the available dipoles in sequence while reducing to an absolute minimum the number of holes required by geometry or FQ issues.

  2. Design basis and requirements for 241-SY modular exhauster mechanical installation

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1994-01-01

    A new ventilation system is being installed to serve as the K-1 primary exhauster. The existing K-1 primary exhauster will then become the backup. This ventilation system services waste tanks 241-SY-101, 102 and 103. The nominal flow rate through the ventilation system is 1,000 cfm. The new ventilation system will contain a moisture eliminator, a heater, a prefilter, two stages of HEPA filtration, an exhaust fan, a stack and stack sampling system. The purpose of this document is to serve as the design and functional requirements for the mechanical installation of the new 241-SY modular exhauster. The mechanical installation will include modifying the existing ductwork (i.e., installing a ''T'' to connect the new exhauster to the existing system), modifying the existing condensate drain lines to accommodate the new lines associated with the new exhauster, a maintenance platform near the stack of the new exhauster, guy wires and guy wire footings to support the stack of the new exhauster, as well as other miscellaneous tasks associated with the mechanical installation design effort

  3. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  4. Instalaţie de condensare gaze exhaustate de la linia de presare feţe de uşi (HDF, cu recuperator de căldură şi colectare ape uzate/Condensing instalation for exhausted gas from door-skin pressing line (HDF with heat recovery and waste water collecting

    Directory of Open Access Journals (Sweden)

    Nicolae BĂDIN

    2016-12-01

    Full Text Available During the door-skin pressing (HDF, on the production facility are emitted an importing quantity of gases which have an substantial part of dust (small particles and another pollutant (formaldehyde, etc. Ordinary production line give all those gases in atmosphere but the newest prescription of European regulation (BAT try to reduce to the minimum (eliminate if it possible those emissions .In this ideas I present one solution for capture gases and use his energy for another purposes. In the same time, waste water with polluted material are collected separately and stored, used or eliminated with proper company.

  5. Solar installations for drying agricultural products

    International Nuclear Information System (INIS)

    Motulevich, V.P.

    2006-01-01

    Six types of solar installations for drying various agricultural products are presented: the solar drying platform, the solar dryer for granular products, the hotbed dryer, solar dryer with natural draught, radiation-convection solar dryer and solar dryer for cotton. Relative simplicity, cheapness and opportunity of use near to a place of these products cultivation are the general characteristics of these installations. The numerous long tests which have been carried out in the Scientific-Industrial Corporation [Sun] of Turkmenistan Academy of Sciences have proved their efficiency and convenience in operation

  6. Licensing and decommissioning of nuclear installations

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Working Group 1 (Licensing and Decommissioning of Nuclear Installations) investigated the question, 'Should it be recommended to work out international principles and rules on the licensing and decommissioning of nuclear installations and to make them subject to international instruments'. It was found that the legal systems in the countries examined are still too disparate to allow for a recommendation aiming at harmonizing the provisions for licensing. With respect to decommissioning, the WG considers the IAEA three-stage-plan to be a valuable first step towards standardisation. (CW) [de

  7. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sim, Bong Shick; Kim, Y. S.; Lee, C. Y. and others

    1999-03-01

    The principal contents of this project are to design, fabricate and install the steady-state fuel test loop in HANARO for nuclear technology development. Procurement and fabrication of main equipment, licensing and technical review for fuel test loop have been performed during 2 years(1997, 1998) for this project. Following contents are described in the report. - Procurement and fabrication of the equipment, piping for OPS - IPS manufacture - License - Technical review and evaluation of the FTL facility. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and review ofHANARO interface have been performed respectively. (author)

  8. Tolley's industrial and commercial gas installation practice

    CERN Document Server

    Hazlehurst, John

    2010-01-01

    This is the third of three essential reference volumes for those concerned with the installation and servicing of domestic and industrial gas equipment. This volume explains the basic principles underlying the practical and theoretical aspects of installing and servicing gas appliances and associated equipment, from the basics of combustion, to burners, pressure and flow, transfer of heat, controls, as well as materials and processes, electrical aspects, and metering and measuring devices. Covering both Natural Gas and Liquefied Petroleum Gas, the many illustrations and worked examples include

  9. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  10. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  11. Lightning Performance on Overhead Distribution Lines : After Improvement Field Observation

    Directory of Open Access Journals (Sweden)

    Reynaldo Zoro

    2009-11-01

    Full Text Available Two feeders of 20 kV overhead distribution lines which are located in a high lightning density area are chosen to be observed as a field study due to their good lightning performance after improvement of lightning protection system. These two feeders used the new overhead ground wire and new line arrester equipped with lightning counter on the main lines. The significant reduced of lines outages are reported. Study was carried out to observe these improvements by comparing to the other two feeders line which are not improved and not equipped yet with the ground wire and line arrester. These two feeders located in the nearby area. Two cameras were installed to record the trajectory of the lightning strikes on the improved lines. Lightning peak currents are measured using magnetic tape measurement system installed on the grounding lead of lightning arrester. Lightning overvoltage calculations are carried out by using several scenarios based on observation results and historical lightning data derived from lightning detection network. Lightning overvoltages caused by indirect or direct strikes are analyzed to get the lightning performance of the lines. The best scenario was chosen and performance of the lines were improved significantly by installing overhead ground wire and improvement of lightning arrester installation.

  12. An automatic system for controlling the quality of straws installed in the ATLAS TRT detector

    CERN Document Server

    Golunov, A O; Gousakov, Yu V; Kekelidze, G D; Livinski, V V; Mouraviev, S V; Parzycki, S S; Peshekhonov, V D; Price, M J; Savenkov, A A

    2004-01-01

    This article describes an automatic system to control the quality of straws installed in the wheels of the end-cap Transition Radiation Tracker of the ATLAS experiment. The system tests both the straightness and the electrical insulation of the straws during installation. The testing time per straw is 9s; consequently it takes about 2h to measure one layer of straws. The off-line analysis takes 20s per straw. With this system defects can be immediately detected and corrected. This clearly influences the future performance of the detector.

  13. Participatory ergonomics applied in installation work

    NARCIS (Netherlands)

    Jong, A.M. de; Vink, P.

    2002-01-01

    This paper evaluates a step-by-step participatory approach to better work, applied in reducing the musculoskeletal workload in installation work. To arrive at a reduction in workload, a steering group led the project through the following steps: Introduction: defining the goal and informing all 7000

  14. First detector installed inside the ALICE solenoid...

    CERN Multimedia

    2006-01-01

    ALICE's emblematic red magnet welcomed its first detector on 23 September, when the array of seven Cherenkov detectors, named HMPID, was successfully installed. ALICE team members standing in front of the completed HMPID detector.The red magnet, viewed from its front opening. The HMPID unit, seen from the back (top right corner of photo) is placed on a frame and lifted onto a platform during the installation. After the installation of the ACORDE scintillator array and the muon trigger and tracking chambers, the ALICE collaboration fitted the first detector inside the solenoid. The HMPID, for High Momentum Particle Identification, was installed at the 2 o'clock position in the central and most external region of the space frame, just below the solenoid yoke. It will be used to extend the hadron identification capability of the ALICE experiment up to 5 GeV/c, thus complementing the reach of the other particle identification systems (ITS, TPC and TOF). The HMPID is a Ring Imaging Cherenkov (RICH) detector in a...

  15. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... concerning urban computing, including media architecture....

  16. Installation of the ALICE dipole magnet

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The large dipole magnet is installed on the ALICE detector at CERN. This magnet, which is cooled by demineralised water, will bend the path of muons that leave the huge rectangular solenoid (in the background). These muons are heavy electrons that interact less with matter, allowing them to traverse the main section of the detector.

  17. Reuse of Waste Oil at Army Installations.

    Science.gov (United States)

    1982-09-01

    Thousands of gallons ot used crankcase oil are The Toxic Substance Control Act (PL 94-4,0) bulned each year ii Army boilers. Before an instal- regulates...ATTN: Chief. SwGAS-L ATTN: ATZLCA-SA ATTN: Chief. SWGCO-M Los Angeles 90053 Ft. Lee, VA 23801 ATTN: Chief. SPLED-E ATTN: DRXMC-U (2) San Francisco

  18. Installation in Outdoor Advertising Designs: Engagement with ...

    African Journals Online (AJOL)

    The 3D sculptural art form as a reminder medium, positions popular brands such as Star lager beer, Guinness and Milo beverage. Dictates of globalization experienced in Integrated Marketing Communication (IMC) now uses installation as movable promotional medium seen in Triple.X Historical and analytical methods in ...

  19. Solar Energy Installers Curriculum Guides. Final Report.

    Science.gov (United States)

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  20. Computer systems for nuclear installation data control

    International Nuclear Information System (INIS)

    1987-09-01

    The computer programs developed by Divisao de Instalacoes Nucleares (DIN) from Brazilian CNEN for data control on nuclear installations in Brazil are presented. The following computer programs are described: control of registered companies, control of industrial sources, irradiators and monitors; control of liable person; control of industry irregularities; for elaborating credence tests; for shielding analysis; control of waste refuge [pt

  1. On the Modelling of Pile Installation

    NARCIS (Netherlands)

    Dijkstra, J.

    2009-01-01

    This thesis introduces two different types of physical model tests to investigate the stress and density change in the soil during installation of a jacked pile as well as two numerical modelling approaches to model the same process in a finite element code capable of large deformations.

  2. Installation in Outdoor Advertising Designs: Engagement with ...

    African Journals Online (AJOL)

    The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader). If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

  3. Installations solaires photovoltaïques

    CERN Document Server

    2014-01-01

    Cet ouvrage présente les règles de conception et de mise en œuvre des installations photovoltaïques raccordées au réseau public de distribution à basse tension. Il s’applique aux bâtiments neufs et existants et concerne non seulement les petites installations résidentielles, d’une puissance de l’ordre de quelques kWc, mais aussi celles des bâtiments collectifs, tertiaires ou agricoles. Il traite successivement : - des fondamentaux de l'énergie solaire photovoltaïque (gisement solaire, principe de la conversion, composants d'une installation...) ; - du dimensionnement de l'installation (choix des matériels, règles de conception, estimation de l'énergie récupérable...) ; - de sa mise en oeuvre (travail en hauteur, habilitation électrique, mise en service, maintenance...) ; - des démarches administratives nécessaires (aides financières, accès au réseau de distribution, vente de l'électricité produite...).

  4. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  5. UIUC control console installation and upgrade

    International Nuclear Information System (INIS)

    Holm, Richard L.

    1994-01-01

    The University of Illinois Nuclear Reactor Laboratory shutdown in March of 1993 to install the General Atomics digital control console. Two weeks of this period were devoted to refurbishment of the rod drives and two weeks were the actual installation of the console. Much of the wiring necessary to install the console was done during the period when the rod drives were being refurbished. A few mistakes were made along the way. 1) A 'repaired' extension cord was temporarily used to supply power to the DAC... the ground and neutral were reversed... this was not appreciated by the DAC! We had to replace a couple of the boards in the DAC after that little fiasco. 2) The instrumentation cables for the rod drives were received with the plugs all connected and ready to install... except you can't put a two inch plug through a half inch conduit. We had to cut the plugs off, run the cable through the conduit, and then resolder the plugs on where the rod drive assembly connects (my privilege). 3) We had to replace the memory board in the NM1000 in order to prevent it from losing its mind every time it got turned off. 4) There were problems with the pulse data acquisition that were eventually traced to a problem in the ribbon cable between the mother and daughter boards. All in all the installation and operation of the console went fairly well. There are still occasional glitches, but none serious or excessively annoying. The console installation is part of an upgrade program to replace all of the instrumentation in the facility with the modern equivalent. The pressure and flow sensors, currently air operated, are being replaced with 4-20 ma transmitters for input into the control console and into a mimic board for the primary and secondary systems. Through the funding of the now defunct, temporarily we hope, Reactor Instrumentation Program we have upgraded our area radiation monitors as well. These upgrades provide us with more reliable equipment as well as consolidating

  6. 46 CFR 58.10-10 - Diesel engine installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  7. 49 CFR 192.373 - Service lines: Cast iron and ductile iron.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Service lines: Cast iron and ductile iron. 192.373... Regulators, and Service Lines § 192.373 Service lines: Cast iron and ductile iron. (a) Cast or ductile iron... cast iron pipe or ductile iron pipe is installed for use as a service line, the part of the service...

  8. The Swiss nuclear installations. Annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs.

  9. The Swiss nuclear installations. Annual report 1994

    International Nuclear Information System (INIS)

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs

  10. production lines

    Directory of Open Access Journals (Sweden)

    Jingshan Li

    2000-01-01

    Full Text Available In this work, serial production lines with finished goods buffers operating in the pull regime are considered. The machines are assumed to obey Bernoulli reliability model. The problem of satisfying customers demand is addressed. The level of demand satisfaction is quantified by the due-time performance (DTP, which is defined as the probability to ship to the customer a required number of parts during a fixed time interval. Within this scenario, the definitions of DTP bottlenecks are introduced and a method for their identification is developed.

  11. Line facilities outline

    International Nuclear Information System (INIS)

    1998-08-01

    This book deals with line facilities. The contents of this book are outline line of wire telecommunication ; development of line, classification of section of line and theory of transmission of line, cable line ; structure of line, line of cable in town, line out of town, domestic cable and other lines, Optical communication ; line of optical cable, transmission method, measurement of optical communication and cable of the sea bottom, Equipment of telecommunication line ; telecommunication line facilities and telecommunication of public works, construction of cable line and maintenance and Regulation of line equipment ; regulation on technique, construction and maintenance.

  12. PHOENIX: the production line for science data products at ESO

    OpenAIRE

    Hanuschik, Reinhard

    2015-01-01

    In the past two years ESO has installed a production line for level 2 science data products. Focussing on spectroscopic observations, these in-house generated data products are complementary to the externally provided data products from the imaging surveys. The production line combines mass production (more than one million spectra have been generated so far), previews, and quality control.

  13. A model of the immune-compatibility using the install problem in computer science

    Science.gov (United States)

    Díaz, Felipe

    2014-05-01

    We simulate the immune compatibility using the Install Problem: The idea is to define a Boolean variable for each antibody. This variable is true if the antibody must be in the immune system. The Install Problem refers to the incompatibility that some programs may have with an specific operative system making it impossible to be installed. The analysis was implemented using SMT-solvers, specifically Z3, and the code was wrote using the commands "DependsOn", "Conflict" and "Compatibility_check", making it possible to check the antibody compatibility. The programming languages used to build up the code were Z3-Python and Z3-SMT-Lib. The results can be used in systems biology and in the analysis of immunological therapies. As future line of research it could be developed a more complex algorithm to verify the immunological compatibility.

  14. Parallel Lines

    Directory of Open Access Journals (Sweden)

    James G. Worner

    2017-05-01

    Full Text Available James Worner is an Australian-based writer and scholar currently pursuing a PhD at the University of Technology Sydney. His research seeks to expose masculinities lost in the shadow of Australia’s Anzac hegemony while exploring new opportunities for contemporary historiography. He is the recipient of the Doctoral Scholarship in Historical Consciousness at the university’s Australian Centre of Public History and will be hosted by the University of Bologna during 2017 on a doctoral research writing scholarship.   ‘Parallel Lines’ is one of a collection of stories, The Shapes of Us, exploring liminal spaces of modern life: class, gender, sexuality, race, religion and education. It looks at lives, like lines, that do not meet but which travel in proximity, simultaneously attracted and repelled. James’ short stories have been published in various journals and anthologies.

  15. Installation for analytic chemistry under irradiation

    International Nuclear Information System (INIS)

    Fradin, J.; Azoeuf, P.; Guillon, A.

    1966-01-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [fr

  16. Software safety analysis practice in installation phase

    International Nuclear Information System (INIS)

    Huang, H. W.; Chen, M. H.; Shyu, S. S.

    2010-10-01

    This work performed a software safety analysis in the installation phase of the Lung men nuclear power plant in Taiwan, under the cooperation of Institute of Nuclear Energy Research and Tpc. The US Nuclear Regulatory Commission requests licensee to perform software safety analysis and software verification and validation in each phase of software development life cycle with Branch Technical Position 7-14. In this work, 37 safety grade digital instrumentation and control systems were analyzed by failure mode and effects analysis, which is suggested by IEEE standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The failure mode and effects analysis showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (Author)

  17. Software safety analysis practice in installation phase

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H. W.; Chen, M. H.; Shyu, S. S., E-mail: hwhwang@iner.gov.t [Institute of Nuclear Energy Research, No. 1000 Wenhua Road, Chiaan Village, Longtan Township, 32546 Taoyuan County, Taiwan (China)

    2010-10-15

    This work performed a software safety analysis in the installation phase of the Lung men nuclear power plant in Taiwan, under the cooperation of Institute of Nuclear Energy Research and Tpc. The US Nuclear Regulatory Commission requests licensee to perform software safety analysis and software verification and validation in each phase of software development life cycle with Branch Technical Position 7-14. In this work, 37 safety grade digital instrumentation and control systems were analyzed by failure mode and effects analysis, which is suggested by IEEE standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The failure mode and effects analysis showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (Author)

  18. Idaho National Engineering Laboratory installation roadmap document

    International Nuclear Information System (INIS)

    1993-01-01

    The roadmapping process was initiated by the US Department of Energy's office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included

  19. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  20. Universal smoking installation of rotary type

    Directory of Open Access Journals (Sweden)

    Aminov V. A.

    2017-11-01

    Full Text Available According to the research carried out by the authors the most technological installations for producing meat and fish products are oriented only on one type of raw material (meat or fish, as well as the kind of smoking (cold or hot. Limitations are related to the maximum temperature of the drying agent that affects the product; presence of the system for maintaining the relative humidity of the air mixture; presence of the smoke cooling system coming from the smoke generator and a number of other factors. Enterprises expanding the range of products are forced to purchase new equipment. With a limited production area especially for small businesses this is not convenient. In the paper, a universal smoking installation of the rotor type (USIRT is considered for the production of both meat and fish products using cold or hot smoking. The installation is oriented to a wide range of products. The presence of the smoke cooling system will allow the production of cold smoking products, the presence of the dehumidification and humidification system for the smoke-air mixture will ensure the maintenance of the required technological regime for producing fish and meat products. Based on the example of cold smoking studies have shown that the duration of the process should be reduced while maintaining the quality of the product. For this purpose, ultrasonic (US vibrations have been applied to the smoke-air mixture in USIRT. The studies have been carried out to identify the best type of ultrasound radiators capable of transmitting vibrations of the installation metal surface and from it to pass into the smoke-air mixture in order to intensify the process of cold smoking. The necessary power of ultrasonic generators has been determined. Comparative results of technological processes with the application of ultrasound in the production of fish products have been presented.

  1. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  2. Meteorological characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.

    1988-01-01

    The atmosphere is the most propitious medium to a rapid transport and diffusion of a pollutant. So, it is important to know its local characteristics which is decisive for every evaluation of radioactive release consequences using transfer models. It is also the siege of intense sudden hazardous phenomena, as tornados and typhoons, that should be taken into account in the installation conception. 1 tab., 6 refs. (F.M.)

  3. Process computers automate CERN power supply installations

    CERN Document Server

    Ullrich, H

    1974-01-01

    Computerized automation systems are being used at CERN, Geneva, to improve the capacity, operational reliability and flexibility of the power supply installations for main ring magnets in the experimental zones of particle accelerators. A detailed account of the technological problem involved is followed in the article by a description of the system configuration, the program system and field experience already gathered in similar schemes. (1 refs).

  4. The dismantling of CEA nuclear installations

    International Nuclear Information System (INIS)

    Piketty, Laurence

    2016-03-01

    After having indicated locations of French nuclear installations which are currently being dismantled (about 30 installations), and recalled the different categories of radioactive wastes with respect to their activity level and the associated storage options, this article gives an overview of various aspects of dismantling, more precisely in the case of installations owned and managed by the CEA. These operations comprise the dismantling itself, the recovery and packaging of wastes, old effluents and spent fuels. The organisation and responsible departments within the CEA are presented, and the author outlines some operational problematic issues met due to the age of installations (traceability of activities, regulation evolutions). The issue of financing is then discussed, and its uncertainties are outlined. The dismantling strategy within the CEA-DEN is described, with reference to legal and regulatory frameworks. The next parts of the article address the organisation and the economic impact of these decontamination and dismantling activities within the CEA-DEN, highlight how R and D and advanced technology are a support to this activities as R and D actions address all scientific and technical fields of nuclear decontamination and dismantling. An overview of three important dismantling works is proposed: Fontenay-aux-Roses, the Marcoule CEA centre (a reference centre in the field of nuclear dismantling and decontamination) and the Grenoble CEA centre (reconversion in R and D activities in the fields of technologies of information, of communication, technologies, for health, and in renewable energies). The last part addresses the participation to the Strategic Committee of the Nuclear Sector (CSFN)

  5. Torsion instability of Dynamic Cables during Installation

    OpenAIRE

    Opgård, Marie Finstad

    2017-01-01

    The oil and gas industry today is a heavily regulated segment, and current standard hasestablished restrictions which yields a very limited weather window for offshore cable installations. This is due to experience with cable failure in harsh weather. A limiting factor in current practice is the design criterion for the minimum allowable radius of curvature in the touchdown point. In addition, current practice does not allow for occurrence of compression in the touch down zone...

  6. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2001-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2001 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2001. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  7. Installation of electric generators on turbine engines

    Science.gov (United States)

    Demel, H. F.

    1983-01-01

    The installation of generators on turbine aircraft is discussed. Emphasis is placed on the use of the samarium cobalt generator. Potential advantages of an electric secondary power system at the engine level are listed. The integrated generator and the externally mounted generator are discussed. It is concluded that the integrated generator is best used in turbojet and low bypass ratio engines where there is no easy way of placing generators externally without influencing frontal areas.

  8. MICROCOSM - INSTALLATION OF THE LHC MODEL

    CERN Multimedia

    2002-01-01

    This week, installation of a 6m long section of the LHC starts in Microcosm. This full-scale model is the first part of a new exhibition highlighting the technological challenges and the exciting physics of the LHC era. Many people at CERN have helped with the preparations for the model and the Microcosm team would like to thank all those involved. An inauguration for the press will take place at the start of the next school term.

  9. 500 kV oil-filled cable installed on bridges

    Energy Technology Data Exchange (ETDEWEB)

    Minemura, S.; Maekawa, Y. (Electric Power Development Co. Ltd., Tokyo (Japan))

    1990-04-01

    The 220 kV Ch{bar u}si Trunk Line, now transmitting a maximum of 300 MW of electricity between the Ch{bar u}goku area of Honsh{bar u} and Shikoku island, is expected to be inadequate in the 1990's due to the rise in electrical demand. Therefore, to strengthen this interconnection, a new 500 kV transmission line was proposed. The most significant feature of this transmission line is the installation of 500 kV cables along the bridges (the Seto Ohashi Bridge) which span the Inland Sea (Seto). This is the first 500 kV long-distance transmission cable line. It is also the first large-scale cable line in the world installed along various types of bridges (ten bridges; route length of the bridge portion approximately 8 km). This paper gives an outline of the Honsh{bar u}---Shikoku interconnecting transmission line and also presents some technical features concerning 500 kV cables.

  10. Remotely installed steam generator nozzle dam system

    International Nuclear Information System (INIS)

    Mc Donald, F.X.; Weisel, E.M.; Schukei, G.E.

    1990-01-01

    This patent describes a method for remotely installing a dam unit in a nozzle or a nuclear steam generator head, the head including a manway. It comprises: mounting an articulated manipulator to an internal surface of the head, the manipulator having a free end which carries a jaw member; positioning the manipulator so that the jaw member is adjacent the manway and substantially on the manway axis; passing a first dam segment through the manway and attaching the jaw member to the first segment; positioning the manipulator so that the jaw member holds the first dam segment on one side of the manway axis; passing a second dam segment through the manway into engagement with the first dam segment to form a dam subassembly; translating the manipulator through the head until the dam subassembly is adjacent the nozzle; advancing the jaw member toward the nozzle until the cam subassembly is positioned substantially at the desired location of the dam unit with respect to the nozzle; and deploying the manipulator to install dam support structure between the dam subassembly and the steam generator, thereby forming an installed dam unit

  11. A General Purpose High Performance Linux Installation Infrastructure

    International Nuclear Information System (INIS)

    Wachsmann, Alf

    2002-01-01

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation

  12. A General Purpose High Performance Linux Installation Infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Wachsmann, Alf

    2002-06-17

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation.

  13. Seal of quality for planners of geothermal energy installations, prize for geothermal installations; Guetesiegel fuer Planer von Geothermieanlagen, Geothermiepreis Phase I (2002)

    Energy Technology Data Exchange (ETDEWEB)

    Eugster, W. J. [Polydynamics Engineering Zuerich, Zuerich (Switzerland); Eberhard, M. [Eberhard and Partner AG, Aarau (Switzerland); Koschenz, M. [EMPA, Duebendorf (Switzerland); Morath, M. [Lippuner and Partner AG, Grabs (Switzerland); Rohner, E. [Engeo AG, Arnegg (Switzerland)

    2003-07-01

    This final report for the Swiss Federal Office for Energy describes a project that aimed to improve the awareness of planners and installers involved in geothermal energy projects for the problems encountered when dimensioning both large and small geothermal installations, and to provide the basic knowledge necessary for a correct sizing of such plants. The report's main emphasis is placed on three types of geothermal plant, bore-hole heat exchangers, groundwater use and energy pile installations. The concept of the training programme involved is described, which is to issue certificates and labels for the attainment of three levels of ability. These three levels (Labels A, B and C) cover simple, small plants for heating operation, medium sized plants within a heating capacity range of 30 to approximately 100 kW and large plants for heating and cooling operation with heat capacities greater than 100 kW, respectively. The report also includes details of the time-line aimed for and costs. Also, the idea of an annual prize for geothermal installations is briefly discussed.

  14. Delivery and installation of PC/FRAM at the PNC Tokai Works

    International Nuclear Information System (INIS)

    Sampson, T.E.; Kelley, T.A.; Kroncke, K.E.; Menlove, H.O.; Baca, J.; Asano, Takashi; Terakado, Shigeru; Goto, Yasushi; Kogawa, Noboru

    1997-11-01

    The authors report on the assembly, testing, delivery, installation, and initial testing of three PC/FRAM plutonium isotopic analysis systems at the Power Reactor and Nuclear Fuel Development Corporation's Tokai Works. These systems are intended to measure the isotopic composition and 235 U/plutonium of mixed oxide (MOX) waste in 200-L waste drums. These systems provide capability for performing measurements on lead-lined drums

  15. Decree No. 83/7405 of 18 November 1983 on the licensing procedure for nuclear installations

    International Nuclear Information System (INIS)

    1983-01-01

    This Decree (No. 83/7405) on the licensing procedure for nuclear installations came into force on 19 December 1983 and supersedes Decree No. 7/9141 of 5 December 1974 on the same subject. The general lines of the licensing procedure laid down by this new Decree are similar to that provided by the 1979 Decree; it is also carried out in three stages: site, construction and operating licences are delivered in succession. (NEA) [fr

  16. Does drywall installers' innovative idea reduce the ergonomic exposures of ceiling installation: A field case study.

    Science.gov (United States)

    Dasgupta, Priyadarshini Sengupta; Punnett, Laura; Moir, Susan; Kuhn, Sarah; Buchholz, Bryan

    2016-07-01

    The study was conducted to assess an intervention suggested by the workers to reduce the physical or ergonomic exposures of the drywall installation task. The drywall installers were asked to brainstorm on innovative ideas that could reduce their ergonomic exposures during the drywall installation work. The workers proposed the idea of using a 'deadman' (narrow panel piece) to hold the panels to the ceiling while installing them. The researcher collected quantitative exposure data (PATH, 3DSSPP) at the baseline and intervention phases and compared the phases to find out any change in the exposure while using the 'deadman'. Results showed that ergonomic exposures (such as overhead arm and awkward trunk postures and heavy load handling) were reduced at the intervention phase while using the 'deadman' with an electrically operated lift. The concept of the 'deadman', which was shown to help reduce musculoskeletal exposures during ceiling installation, can be used to fabricate a permanent ergonomic tool to support the ceiling drywall panel. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  17. A NEW RUSSIAN WASTE MANAGEMENT INSTALLATION

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Andrew; Engxy, Thor; Endregard, Monica; Schwab, Patrick; Nazarian, Ashot; Krumrine, Paul; Backe, Steinar; Gorin, Stephen; Evans, Brent

    2003-02-27

    The Polyarninsky Shipyard (sometimes called Navy Yard No. 10 or the Shkval Shipyard) has been designated as the recipient for Solid Radioactive Waste (SRW) management facilities under the Arctic Military Environmental Cooperation (AMEC) Program. The existing SRW storage site at this shipyard is filled to capacity, which is forcing the shipyard to reduce its submarine dismantlement activities. The Polyarninsky Shipyard Waste Management Installation is planned as a combination of several AMEC projects. It will have several elements, including a set of hydraulic metal cutting tools, containers for transport and storage, the Mobile Pretreatment Facility (MPF) for Solid Radioactive Waste, the PICASSO system for radiation monitoring, and a Waste Storage Facility. Hydraulically operated cutting tools can cut many metal items via shearing so that dusts or particulates are not generated. The AMEC Program procured a cutting tool system, consisting of a motor and hydraulic pumping unit, a 38-mm conduit-cutting tool, a 100- mm pipe-cutting tool, and a spreading tool all mounted on a wheeled cart. The vendor modified the tool system for extremely cold conditions and Russian electrical standards, then delivered the tool system to the Polyarninsky shipyard. A new container for transportation and storage of SRW and been designed and fabricated. The first 400 of these containers have been delivered to the Northern Fleet of the Russian Navy for use at the Polyarninsky Shipyard Waste Management Installation. These containers are cylindrical in shape and can hold seven standard 200-liter drums. They are the first containers ever certified in Russia for the offsite transport of military SRW. These containers can be transported by truck, rail, barge, or ship. The MPF will be the focal point of the Polyarninsky Shipyard Waste Management Installation and a key element in meeting the nuclear submarine dismantlement and waste processing needs of the Russian Federation. It will receive raw

  18. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  19. Rules and regulations on ionizing radiations sources installations

    International Nuclear Information System (INIS)

    1980-01-01

    The finality of this legislative text is to establish the standards and procedures for site, design, building, operation and decommissioning of nuclear installations, radioactive installations and ionizing radiations sources. This text include the commercialization of radioactive substances and equipment fabrication

  20. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  1. 46 CFR 176.702 - Installation tests and inspections.

    Science.gov (United States)

    2010-10-01

    ..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...

  2. A tangible digital installation in the classroom

    DEFF Research Database (Denmark)

    Marchetti, Emanuela; Valente, Andrea

    2015-01-01

    : facilitating the emergence of imagination and conceptual thinking, and managing the interplay between cooperation and competition. This cooperation originates from one of the teachers’ interest in MicroCulture, a digital and tangible installation earlier created by the authors and aimed at bridging history...... in the development of her classes, offering opportunities to discuss and explore with the children different forms of social interaction. Difficulties were encountered as the teachers had to find ways of supporting the children, strategically shifting between guidance and responsibility transfer, moderate children...

  3. Solution for remote handling in accelerator installations

    International Nuclear Information System (INIS)

    Burgerjon, J.J.; Ekberg, E.L.; Grisham, D.L.; Horne, R.A.; Meyer, R.E.; Flatau, C.R.; Wilson, K.B.

    1977-01-01

    A description is given of a remote-handling system designed for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF), versatile enough to be used in a variety of situations found around particle accelerators. The system consists of a bilateral (force-reflecting) servomanipulator installed on an articulated hydraulic boom. The boom also carries the necessary tools and observation devices. The whole slave unit can be moved by crane or truck to the area of operation. A control cable connects the slave unit with the control station, located at a safe distance in a trailer. Various stages of development as well as some operating experience are discussed

  4. CAST with its micromegas detector installed.

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    The CERN Axion Solar Telescope (CAST) uses a prototype LHC dipole magnet to search for very weakly interacting neutral particles called axions, which should originate in the core of the Sun. The magnet converts the solar axions to photons which are then detected by an X-ray detector based on Micromegas technology. CAST's Micromegas detector has now been installed. Photos 01 02: General view of the CAST experiment with the Micromegas detector in place. Photo 03: Close-up of the micromegas set-up.

  5. Small wind planning and building successful installations

    CERN Document Server

    Clark, Nolan

    2013-01-01

    This book provides a cohesive guide to achieving successful small wind installations. It is a comprehensive information resource from one of the world's most experienced small wind professionals, covering all the key issues for small wind system development, from site and machine selection to international standards compliance. Engineers who are tasked with planning and developing these small wind systems, from choosing the best site and accurately estimating likely power output to obtaining proper permitting and troubleshooting operational inefficiencies, will find this book an ess

  6. Safety culture in nuclear installations. Proceedings

    International Nuclear Information System (INIS)

    Carnino, A.; Weimann, G.

    1995-04-01

    These proceedings of the International Topical Meeting on Safety Culture in Nuclear Installations held in Vienna, Austria from 24 to 28 April 1995 provide a wide forum of information exchange and discussions on the topic safety culture in nuclear power plants. Safety culture deals with human factors since it deals with attitudes, organization and management. It then means that it has a natural component in it which is linked to the national culture and education. There are about 95 contributions, some of them presented by title and abstract only. All of them are in the subject scope of INIS. (Botek)

  7. RF installation for the grain disinfestation

    CERN Document Server

    Zajtzev, B V; Kobetz, A F; Rudiak, B I

    2001-01-01

    The ecologically pure method of grain product disinfestations through the grain treatment with the RF electric field is described. The experimental data obtained showed that with strengths of the electrical RF field of E=5 kV/cm and frequency of 80 MHz the relative death rate is 100%.The time of the grain treatment it this case is 1 sec. The pulses with a duration of 600 mu s and repetition rate of 2 Hz were used, the duration of the front was 10 mu s. The schematic layout of installation with a productivity of 50 tones/h and power of 10 kW is given.

  8. Process computers automate CERN power supply installations

    International Nuclear Information System (INIS)

    Ullrich, H.; Martin, A.

    1974-01-01

    Higher standards of performance and reliability in the power plants of large particle accelerators necessitate increasing use of automation. The CERN (European Nuclear Research Centre) in Geneva started to employ process computers for plant automation at an early stage in its history. The great complexity and extent of the plants for high-energy physics first led to the setting-up of decentralized automatic systems which are now being increasingly combined into one interconnected automation system. One of these automatic systems controls and monitors the extensive power supply installations for the main ring magnets in the experimental zones. (orig.) [de

  9. Coiled transmission line pulse generators

    Science.gov (United States)

    McDonald, Kenneth Fox

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  10. Seismo-acoustic array installed in Vrancea seismogenic area

    Science.gov (United States)

    Ionescu, Constantin; Moldovan, Adrian-Septimiu; Moldovan, Iren-Adelina; Ghica, Daniela

    2010-05-01

    The National Institute for Earth Physics (NIEP) has installed two infrasound networks: a four-element seismo-acoustic array with an 1.2 km aperture (IPLOR) and a three-element array with a 400m aperture (IOANE). Both arrays are installed in Vrancea seismogenic area. Each array element of IPLOR consists of three sensors (a seismic 3C broad-band instrument with 1000V/m/s sensitivity, an accelerometer +/-2g EpiSensor type, and an infrasound Chaparral type sensor) and a 24-bit digitizer (Quanterra Q330). The BB sensors and accelerometers are located in 3 meters deep boreholes, while the infrasound sensors are installed in a plastic 1 mc container connected to a porous flexible pipe or plastic tube (for the central element). Inter-array communication is achieved by radio link (2.4 GHz frequency band) which transmits the data from the six-channel digitizers to the local acquisition system. Each power array element consisted of a 12 V DC source powered by the commercial power line or solar panels. The data acquisition system is based on the Seiscomp3 software; a sampling rate of 100 samples per second is applied for BB seismic instruments and accelerometers, whilst for the infrasound sensor a 20 sps rate is used. Each array element of IPLOR consists of a MBAZEL2007 microbarometer and a 24-bit digitizer. Inter-array communication is achieved by a fiber optic link. The sampling rate is 10 sps. The Vrancea seismo-acoustic array is used to identify and locate events associated with industrial blasts, to detect local and regional events, as well for the complex studies on the Vrancea seismogenic area. Moreover, the array data accelerometers are used in the early warning system for Bucharest. At NIEP, several programs are running to analyze each type of data (seismic and acoustic): for BB seismic data, a software for event detection and characterization, kindly provided by NORSAR, is applied, acceleration data recorded by the episensors are processed with a software developed

  11. Characterization of DoD Installation Wastewater Treatment

    Science.gov (United States)

    2012-11-27

    D: Compilation of Data for On-Site Wastewater Treatment Facilities Installation ( WWTP name in parantheses when more than one plant per...Characterization of Wastewater Treatment in DoD D-2 Installation ( WWTP name in parantheses when more than one plant per installation) Treatment...Holloman AFB unknown L GOGO NM0029971 Characterization of Wastewater Treatment in DoD D-3 Installation ( WWTP name in parantheses when

  12. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  13. General installation of pressurized water reactors; Installation generale des reacteurs a eau sous pression

    Energy Technology Data Exchange (ETDEWEB)

    Kaercher, M. [Electricite de France (EDF), 75 - Paris (France)

    2002-07-01

    This article describes the criteria considered for the installation of PWR reactors according to the most recent French standard: the N4 - 1450 MWe plant series which benefits of the experience feedback of the previous 900 and 1300 MWe series: 1 - functional organization: nuclear island, classical island; 2 - general principles of installation: safety, functional and operation requirements, grouping of equipments inside buildings, criteria of equipments separation; 3 - location of the main equipments, plot plan: specific site constraints, sitting of facilities, leveling; 4 - general installation of buildings: reactor building, fuel building, electrical and auxiliaries building, nuclear auxiliaries building, machines room, pumping station, standby generators building, water storage tank and pool building, effluents processing building; 5 - the EPR european concept: 4 sub-series concept, prevention of serious accidents, annual collective dose. (J.S.)

  14. Groundwater quality monitoring well installation for Waste Area Grouping 4 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.

    1994-09-01

    This report documents the drilling and installation of 15 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 4. WAG 4 is comprised of about 27 acres located in Melton Valley approximately 2700 ft southwest of the Oak Ridge National Laboratory main plant. It contains three inactive solid waste management units: (1) the abandoned intermediate level liquid waste transfer line located along the WAG's northwestern boundary, (2) the experimental pilot pit area, and (3) SWSA 4, the largest unit in the WAG. The wells at WAG 4 were drilled and developed between September 1987 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy (DOE), state, and Environmental Protection Agency regulatory requirements. The wells at WAG 4 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 4. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  15. 30 CFR 57.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...

  16. 30 CFR 56.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...

  17. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  18. Installing fonts in LaTeX a user's experience

    NARCIS (Netherlands)

    Hanssen, F.T.Y.

    2003-01-01

    This paper presents a user's experience with installing fonts for use in LaTeX. It will be shown that it is not hard to make a standard Type 1 font work, if you use modern font installation software for LaTeX. All the steps necessary to install the example fonts will be shown. The example fonts used

  19. 46 CFR 181.520 - Installation and location.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer in...

  20. 49 CFR 192.193 - Valve installation in plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  1. 30 CFR 77.201 - Methane content in surface installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The methane...

  2. GAS FLOW IN UNDERWATER BREATHING INSTALLATIONS

    Directory of Open Access Journals (Sweden)

    Anca CONSTANTIN

    2017-11-01

    Full Text Available The open circuit underwater breathing apparatus can be a one or two-stage regulator used in scuba diving or a two-stage regulator used in surface supplied installations. These installations are proper in underwater sites at small depth. The pneumatic circuit of a two-stage regulator is composed mainly of a first stage regulator mounted on the air cylinders and a second stage carried by the diver in his mouth. The two regulators are linked together by a medium pressure hose. The circuit opens when the depression created by the diver’s inhalation, in the second stage body, reaches a certain value. The second stage opening causes a transient movement, namely an expansion wave that propagates through the medium pressure hose to the first stage regulator. The first stage regulator opens and the air in the cylinders is allowed to flow to the diver. The longer the hose, the greater the duration of the expansion wave propagation. Investigations on the wave propagation offer data on the inspiration unsteady motion duration which influences the respiratory effort of the diver.

  3. Performance of Installed Cooking Exhaust Devices

    Energy Technology Data Exchange (ETDEWEB)

    Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

    2011-11-01

    The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) – including exhaust fan/microwave combination appliances – were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

  4. Emotion in Painting and Art Installations.

    Science.gov (United States)

    Konečni, Vladimir J

    2015-01-01

    Paintings are static 2-dimensional images with limited narrative means. On the basis of a critical analysis of the relevant laboratory scaling studies, museum studies, and neuroaesthetic work, the article reaches a negative conclusion about most paintings' ability to engage sufficiently with general viewers' associative-memory systems, so as to lead to identification and empathy, and induce fundamental psychobiological emotions. In contrast, designers of art installations can draw on subtle combinations of several classes of stimulus properties with psychological significance subsumable under the classical concept of the sublime (physical grandeur, rarity, an association with beauty and with biologically significant outcomes), so that some installations may induce the peak aesthetic emotional response, aesthetic awe--as defined in Aesthetic Trinity Theory (Konečni, 2005, 2011), along with the states of being moved and physiological thrills. The approach also involves an analytical skepticism about emotivism, defined as a culturological proclivity for unnecessary insertion of emotion into accounts of mental life and behavior, especially in the arts. Implications for the role of emotion theory in empirical aesthetics are examined.

  5. Leukemia and cancer around nuclear installations

    International Nuclear Information System (INIS)

    Draper, G.J.

    1990-01-01

    Most reports of an increased incidence of childhood leukemia and less frequently, cancer around nuclear installations in the U.K., are based on inadequate analysis. Although positive associations have been found, the findings are inconsistent. During 1956-1963 there were five cases of leukemia in children under 10 y of age, near the Sellafield nuclear fuel reprocessing plant, an incidence approximately 10 times than that expected. There was a fourfold excess in 1968-1978 for leukemia deaths at ages 0-24 y and a twofold excess from 1959-1978. The excess in Seascale affected those born in this village, rather than those living but not born there, and the excess related also to other childhood cancers. Among 1,068 children born there were five deaths from leukemia compared with 0.53 expected. There was also a threefold excess of other cancers. These studies support the suggestion that the incidence of leukemia in young persons is raised around nuclear installations, but the results are inconsistent. Where detailed dosimetry has been done, the excess risk is too high in relation to the population exposure to radiation to be explained on the basis of current radiobiological theory, and the discrepancies are inconsistent

  6. Selecting parameters of air heating installations

    Energy Technology Data Exchange (ETDEWEB)

    Nazarevich, V.V.; Cherdantsev, N.V.; Bakhtin, G.M. (Kuzbasskii Politekhnicheskii Institut (Russian Federation))

    1993-04-01

    Evaluates types and output of air heating installations used in selected coal basins of the Russian Federation (Kuzbass and Pechora) and Kazakhstan (Karaganda). Types and capacity of mine blowers (VTs, VTsD and VOD), air supply rates and parameters of the air heating installations are comparatively evaluated. Mine shafts used for ventilation in 3 basins are comparatively evaluated considering their air flow rate: 6.4% of shafts with a flow rate to 65 m[sup 3]/s, 12.8% with a flow rate of 65-100 m[sup 3], 20.5% with a flow rate of 101-150, 21.8% with a flow rate of 151-200, 30.8% with a flow rate of 201-300, 6.4% with a flow rate of 301-400 and 1.3% with a flow rate greater than 400 m[sup 3]/s. Recommendations are made for the capacity of air heating systems for individual classes of ventilation shafts.

  7. 47 CFR 68.213 - Installation of other than “fully protected” non-system simple customer premises wiring.

    Science.gov (United States)

    2010-10-01

    ... non-system simple customer premises wiring. 68.213 Section 68.213 Telecommunication FEDERAL... protected” non-system simple customer premises wiring. (a) Scope of this rule. Provisions of this rule apply only to “unprotected” premises wiring used with simple installations of wiring for up to four line...

  8. Experience in float over integrated deck -- Design and installation

    Energy Technology Data Exchange (ETDEWEB)

    Sigrist, J.H.; Naudin, J.C.

    1996-12-31

    Since early 1980, Technip-Geoproduction (TPG), as designer or as installation contractor, has been using with success the float over system UNIDECK-TPG for the transportation and installation of integrated decks for offshore platforms. The concept offers the advantages of significant savings in transportation and installation cost by minimizing the installation time and offshore hook-up and eliminating the need for a heavy lift derrick barge. The paper describes the technology used for the installation, the required engineering studies, the consequences of using such a concept on platform design and the selection of an appropriate barge size to be used.

  9. Designing performativity for mixed reality installations

    Directory of Open Access Journals (Sweden)

    Andrew Morrison

    2010-07-01

    Full Text Available This article takes up the concept of performativity prevalent in the humanities and applies it to the design of installation arts in mixed reality mode. Based on the design, development and public access to two specific works, the concept is related to a form of research by design. We argue that the concept of performativity may be further usefully employed in investigations (design and research, artistic and public into digital arts where complex intersections between concepts, technologies, dramaturgy, media and participant actions are in flux and together constitute the emergence and experience of a work. Theories of performativity are related to these two works in an argument that further suggests there is room in research by design to also include ‘performative design’. The article is the result of a wide-ranging interdisciplinary collaboration and aims to convey some sense of that in its reporting style, content and analysis.

  10. Radiation protection in Spanish nuclear installations

    International Nuclear Information System (INIS)

    Carmena, P.; Iniguez, J.

    1997-01-01

    Radiation Protection was born as a discipline at the same time as the use of ionizing radiation, once the potential harmful effects on living beings of this new phenomenon was recognized. The evolution of the use of the nuclear energy at an industrial scale brought about the evolution of this discipline , initially in association with responsibilities relating to hygiene and safety at work and subsequently as an independent responsibility within organizations involved in nuclear electricity production. From the very beginning, in the year 1968, the Spanish nuclear plant organizations included specific resources for the radiation protection of both the plant workers and the general public living around the installations. Since that time, however, radiation protection organizations and technology have evolved considerably. The purpose of this article is to present a general overview of the current status of the radiation protection activities carried out at Spanish nuclear power plants. (Author)

  11. Survey of medical radium installations in Wisconsin

    International Nuclear Information System (INIS)

    Tapert, A.C.; Lea, W.L.

    1975-05-01

    A radiation protection survey was performed at 70 medical radium installations in the State of Wisconsin. The requirements of the State's Radiation Protection Code were used as survey criteria. Radiation measurements of radium storage containers, radium capsule leakage tests, and monitoring of work surfaces for contamination were performed. Film badge monitoring data of whole body and extremity doses are presented for 221 individuals at 17 hospitals. Whole body doses during single treatments ranged from 10 to 1360 mrems per individual. The estimate of 500 mrems per treatment was determined as the dose aggregate to hospital personnel. Whole body doses from film badges are compared with analogous TLD doses. Four physicians and six technicians at nine hospitals participated in a study for monitoring the extremities with TLD. Cumulative extremity doses ranged from 28 to 6628 mrems per participant during the study. (U.S.)

  12. Conventional radiology: fixed installations in medical environment

    International Nuclear Information System (INIS)

    2010-01-01

    This document presents the different procedures, the different types of specific hazards, the analysis of risks, their assessment and the preventive methods with regard to radioprotection in the case of fixed conventional radiology equipment in medical environment. It indicates and describes the concerned personnel, the course of procedures, the hazards, the identification of the risk associated with ionizing radiation, the risk assessment and the determination of exposure levels (definition of regulated areas, personnel categories), the strategy aimed at controlling the risk (risk reduction, technical measures concerning the installation or the personnel, teaching and information, prevention, incident), the different measures of medical monitoring, the assessment of risk control, and other risks. An appendix proposes an example of workstation assessment

  13. Safety of nuclear installations. An international comparison

    International Nuclear Information System (INIS)

    Renner, Andrea; Diwes, Andreas; Reingardt, Martin

    2010-01-01

    Safeguarding of nuclear power plants against disruptive actions or other external hazards is part of the plant design and presumption of an operation license. The general principle is defense in depth involving different security zones with separate barriers. The safeguards for nuclear installations are organized in three areas of responsibility: governmental measures (police, military), technical (detectors, scanners, illuminations, camera tracking, concrete barriers) and personnel measures (access control, security personnel, alarm) of the operating company. International responsibilities results from the treaty on the non-proliferation of nuclear weapons and several IAEA documents. The authors discuss the national regulations in Germany, Switzerland, United Kingdom and USA. Older NPPs that are not in compliance with actual safety standards will be a topic of increasing importance.

  14. Reference earthquakes determination. Regulations for nuclear installations

    International Nuclear Information System (INIS)

    Levret, A.; Mohammadioun, B.

    1988-03-01

    Regulations in effect in France for taking into account the seismic motion at a site to ensure the safety of nuclear installations is based upon a seismotectonic approach of deterministic nature. This approach is implemented by a vast number of observations compiled for the most part, in two banks of reliable and uniform data. The first of these contains macroseismic data over about a 1000-year period in France and neighbouring countries the second is made up of strong ground motion recorded in seismic regions the world over. During the first step of an analysis, a maximum reference earthquake is defined for the site, which, by drawing upon a statistical treatment of the strong motion data bank is subsequently matched up with a response spectrum that is representative of both the site intensity and the characteristics of the reference earthquake [fr

  15. Safety and Inspection Planning of Older Installations

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Ersdal, G.

    2008-01-01

    at the end of the expected lifetime - corresponding to a bath-tub hazard rate effect. The approach illustrated is for welded steel details in platforms. Systems effects are considered, including the use of dependence between inspection and failure events in different components for inspection planning.......A basic assumption often made in risk- and reliability-based inspection planning is that a Bayesian approach can be used. This implies that probabilities of failure can be updated in a consistent way when new information (from inspections and repairs) becomes available. The Bayesian approach...... (and coalescence of small cracks) and increased crack growth. This should imply shorter inspection time intervals for ageing structures. Different approaches for updating inspection plans for older installations are proposed. The most promisingmethod consists of increasing the rate of crack initiations...

  16. Reproduction of fresh water desalination installations

    Energy Technology Data Exchange (ETDEWEB)

    Slesarenko, V.N. [Maritime State Univ., Vladivostok (Russian Federation)

    2005-07-01

    This paper discussed ways to desalinate sea water for use at power plants. The advantages of different modes of installation in terms of hydrodynamics and heat exchange were presented along with the parameters that determine their perfection and profitability. In particular, the author used a thermodynamic and thermophysical approach to analyze thermal heat desalination schemes. The analysis estimated the efficiency of reproducing fresh water from the sea at thermal power stations located 10 to 30 km from bodies of salt water. It was shown that heat exchange constitutes the greatest expense of exergy in the desalination process. Three thermal schemes of desalination were compared for their exergy losses. The effect of thin-film on energy efficiency was discussed. An exergy efficiency of up to 90 per cent was found in thin-film evaporation equipment. 6 refs., 1 tab., 5 figs.

  17. Skin: an interactive hyperstereoscopic electro installation

    Science.gov (United States)

    Kostis, Helen-Nicole; Kooima, Robert; Kannenberg, John

    2007-02-01

    It is the uniqueness of Virtual Reality as a medium that calls for the creation of hybrid realities which blur the finite boundaries between physical and digital existence. Virtual Reality's distinguishing features as an artistic medium embody a distinct form of aesthetics: it is a stereoscopic, immersive, interactive, performative, dynamic, and experiential medium. A Virtual Reality art piece manifests in multiple ways. It can present itself as an interactive virtual archetype, exploring concepts rendered from different perspectives, and as an impetus to challenge the platform's capabilities, not only theoretically as an artistic practice, but also by calling for the instantiation of authoring tools for the development of virtual reality experiences. The paradigm presented in this paper is a Virtual Reality art piece, called skin, 2006, developed on Electro, which is an open-source cross-platform development environment. skin, 2006, is an interactive hypersteroscopic high-definition audiovisual installation that explores a dialogue between physical and digital senses of "touch".

  18. New electricity generating installations - Czech experience

    International Nuclear Information System (INIS)

    Biza, K.; Pazdera, F.; Zdarek, J.

    2004-01-01

    Economically and technically are analysed alternatives for new electricity generation installations (GEN 111+ NPPs, finalization of NPPs under construction, lifetime extension of existing NPPs, coal plants and gas plants). Described are experienced with NPP Temelin (lessons learned from its design, construction, start-up and resent operation and service experience) and new Czech Energy Policy, where the nuclear energy is an important source for electricity generation. Discussed is also impact of potential trading with CO 2 limits and strategy on minimization of dependence on energy from politically unstable regions. Underlined is important role of preparation of young generation for safe and reliable long term operation of NPPs. General recommendation is to orient on finalization of NPPs under construction, lifetime extension of existing NPPs and long term orientation on new generation of NPPs (GEN III+ and GEN IV). (author)

  19. Status and plans for Linac4 installation and commissioning

    CERN Document Server

    Vretenar, M; Arnaudon, L; Baudrenghien, P; Bellodi, G; Broere, J; Brunner, O; Comblin, J F; Coupard, J; Dimov, V A; Fuchs, J F; Funken, A; Gerigk, F; Granemann Souza, E; Hanke, K; Hansen, J; Yarmohammadi Satri, M; Kozsar, I; Lallement, J B; Lenardon, F; Lettry, J; Lombardi, A M; Maglioni, C; Midtun, O; Mikulec, B; Nisbet, D; Paoluzzi, M; Raich, U; Ramberger, S; Roncarolo, F; Rossi, C; Sanchez Alvarez, J L; Scrivens, R; Tan, J; Valerio-Lizarraga, C A; Vollaire, J; Wegner, R; Weisz, S; Zocca, F

    2014-01-01

    Linac4 is a normal conducting 160 MeV Hˉ linear accelerator presently being installed and progressively commissioned at CERN. It will replace the ageing 50 MeV Linac2 as injector of the PS Booster (PSB), increasing at the same time its brightness by a factor of two thanks to the higher injection energy. This will be the first step of a program to increase the beam brightness in the LHC injectors for the needs of the High-Luminosity LHC project. After a series of beam measurements on a dedicated test stand the 3 MeV Linac4 front-end, including ion source, RFQ and a beam chopping line, has been recommissioned at its final position in the Linac4 tunnel. Commissioning of the following section, the Drift Tube Linac, is starting. Beam commissioning will take place in steps of increasing energy, to reach the final 160 MeV in 2015. An extended beam measurement phase including testing of stripping equipment for the PSB and a year-long test run to assess and improve Linac4 reliability will take place in 2016, prior to...

  20. Solar heating system installed at Stamford, CT. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    Information is provided on the solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut. The information consists of description of system and components, operation and maintenance manual, as-built drawings and manufacturer's component data. The solar system was designed to provide approximately 50 percent of the heating requirements. The solar facility has 2,561 sq. ft. of liquid flat plate collectors and a 6000 gallon, stone lined, well-insulated storage tank. Freeze protection is provided by a 50 percent glycol/water mixture in the collector loop. From the storage tank, solar heated water is fed into the building's distributed heat pump loop via a modulating three-way valve. If the storage tank temperature drops below 80/sup 0/F, the building loop may be supplied from the existing electrical hot water boilers. The Executive East Office Building is of moderate size, 25,000 sq. ft. of heated space in 2 1/2 stories. The solar system makes available for other users up to 150 KVA of existing electrical generating capacity.

  1. Review of potential 230-kV cable installation by horizontal directional drilling : Tsawwassen, British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-02-29

    As part of the Vancouver Island transmission reinforcement (VITR) project, British Columbia Transmission Corporation (BCTC) is proposing a 4 km long section of overhead line between the existing Tsawwassen substation and the English Bluff terminal. Mill Creek Management Technologies, Inc. proposed that the 4-km installation be performed using underground cables installed by horizontal directional drilling. The Ministry of Energy, Mines and Petroleum Resources of British Columbia commissioned an independent assessment of the potential installation, addressing directional drilling feasibility as well as cable system design. This report presented the results of that assessment. It considered alignment and horizontal directional drills. Cable considerations such as cable design, installation, operation, repair and maintenance were discussed. The report also presented a cost estimate and time schedule. A review of the potential horizontal directional drills showed that the drills should be feasible. In addition, it was found that although the cable system was feasible, there were many effects on power system operation and maintenance that should be evaluated. 4 tabs., 1 fig., 2 appendices.

  2. Development of a Live-Line Robot and a New Construction Method at Distributed Lines

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Seung Ho; Kim, Chang Hoi; Seo, Yong Chil; Shin, Ho Cheol; Lee, Sung Uk; Kim, Seung Jo

    2008-10-15

    The developed live-line robot is installed in the commercial live-line working truck used in the live-line works. The optimal installing position and method was analyzed by the graphical simulation. The dual arm robot was designed to have a maximize work space through the optimal configuration simulation in which the accessibility and interference of the robot to the distributed line environments were checked. The shape, material and size of the links was designed through the mechanical analysis, The prototype was made based on the analysis. The developed robot is insulated by the upper arm made of the FRP material. The insulation performance of the robot was verify by the leakage current test and the flashover voltage test. A tele-operating control system was developed for a operator to easily manipulate the developed robot and to actively manage the various conditions of the distributed line. The functions of the robot tested in the mockup. The insulation performance was tested and verified in the KERI (Korea Electrotechnology Research Institute). Finally, the performance of the developed robot was tested at the distributed line of the Gochang electric power test center.

  3. Beam line to S155

    CERN Multimedia

    1977-01-01

    The experiment S155 was designed by the Orsay (CSNM-CNRS) Collaboration to observe the properties of exotic light nuclei. It was installed in the PS neutrino tunnel. The photo shows a mass spectrometer (in the background) on line with the PS proton beam which arrives (bottom, right) from the fast extraction FE74. Roger Fergeau stands on the left. The alkaline isotopes produced in the carbon-uranium target heated at 2000°C were swiftly extracted, mass separated, and brought to a detector behind the shielding. Sodium 34 (11 protons and 23 neutrons) was observed and its half-life of only 5 ms was measured. The excited levels 2+ of Magnesium 30 and Magnesium 32 (Sodium descendants) were localised, and the magic number 20 was found to vanish. Thus, the discovery made earlier for Sodium 30 and Sodium 32, with the same apparatus, was confirmed. (See also photo 7706511.)

  4. Monobuoy monitoring system - project, installation and preliminary results; Sistema de monitoracao de monoboias maritimas - desenvolvimento, instalacao e analise preliminar de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Daniel L.; Machado Filho, Remo Z. [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Medeiros Junior, Adory J. [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    A monobuoy monitoring system was developed and installed on 2004 in two oil terminals of TRANSPETRO. The main purpose of this system is to assure that monobuoys will be assisted during offloading operations, which will reduce the risk of accidents and detect immediately damages on mooring lines and equipment. The system comprises a Control Module on terminal site and a Remote Monitoring Unit, installed on each monobuoy. The link between modules is provided by an UHF radio-modem. The parameters acquired are pitch, roll, heave, geographic position, internal variables, and, if available, pressure and temperature of lines, traction on mooring system, etc. Positioning information is processed by the PETRONAV Positioning System. The whole process is registered and monitored on terminal with graphical interface. This article describes the development and installation of the system and the preliminary analysis of data produced since the system was installed. (author)

  5. New high-speed line Nuremberg - Ingolstadt - Electrical engineering equipment; Neubaustrecke (NBS) Nuernberg - Ingolstadt - Technische Ausruestung

    Energy Technology Data Exchange (ETDEWEB)

    Krems, S. [Balfour Beatty Rail GmbH, Berlin (Germany); Matthes, U. [DB Projektbau GmbH, Nuernberg (Germany)

    2007-07-01

    The Bavarian fast railway line Nuremberg - Ingolstadt is equipped with most recent railway infrastructure for a 300 km/h fast high-speed traffic. The electrical engineering installations were implemented within a seven years period. Since December 2006 the line has been integrated into scheduled services and operated with high-speed trains. So far, the installations complied fully with all the requirements. (orig.)

  6. Installation Restoration Program Records Search for Des Moines Air National Guard Installation, Iowa

    Science.gov (United States)

    1983-09-01

    source of potable water for Des Moines and vicinity. A generalized geologic section for the Des Moines ANG Installation and vicinity is given in Table 3...2,500-2,550 .Yes Fair St. Lawrence Dolomite Yes Fair Franconia Sandstone, siltstone, and shale -- No -- Galesville Sandstone No -- Eau Claire Sandstone...generally highly mineralized and/or at great depth, so that only the Quaternary alluvial aquifer is a major source of potable water. *Small volumes (a

  7. Energy regulation of burning installations; Reglementation energetique des installations de combustion

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-02-18

    This document concerning the energy regulation of burning installations contains a section outlining the juridical context and three decrees. The juridical context is made up the law no. 96-1236 of 30 December 1996 about the air and rational use of energy, namely, the title VII technical measures, which modified deeply the legal bases for the technical regulation concerning the energy consuming devices. On this new juridical basis the Secretariat of State for industry updates the ensemble of regulations about the energy performance of heaters and burning installations. The following three decrees resulted: Decree no. 97-834 of 4 September 1997 suppressing the preceding consultation of the Administration on matters of energy use, the Decree no. 98-817 of 11 September 1998 on yields and equipment of heaters of power within 400 kW and 50 MW and the Decree no. 98-833 of 16 September 1998 on periodic inspection of the installations consuming thermal energy. The document contains a general presentation and indicates the application modes of the three mentioned decrees.

  8. Preventive medicine oversight of splash pads on military installations.

    Science.gov (United States)

    Hardcastle, Lisa Raysby; Perry, Matthew; Browne, Ashley

    2015-01-01

    Over the past several years, an increasing number of military installations have installed splash pads that provide fun, recreational water entertainment for Soldiers and their families. The addition of splash pads brings added responsibilities for medical treatment facility preventive medicine oversight and installation facilities maintenance to ensure a safe and healthy environment. Currently, there are no consistent standards or detailed guidance for military installations to follow when installing and maintaining splash pads. The central issues associated with splash pads on military installations are water quality and risk for waterborne illnesses, responsibility for safety and health oversight, and federal energy and water sustainability mandates. This article examines the importance of implementing a standard for design and oversight to ensure the health and safety of Soldiers and their families.

  9. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  10. IPPC installations in France and limit values of emission

    International Nuclear Information System (INIS)

    Soleille, S.

    2004-05-01

    The IPPC directive of the 24 September 1996 asked for the main european industrial installations an authorization. This authorization fixes limit values for pollutant emissions. In France, the main industrial installations are controlled since many years in the framework of the regulation on classified installations for the environment protection (ICPE). This report compares the limit values of emissions for the national and prefectorial orders and for the IPPC directive. (A.L.B.)

  11. Installation of the Canadian Muon Cargo Inspection System at CRL

    Science.gov (United States)

    2014-04-01

    Installation of the Canadian Muon Cargo Inspection System at CRL Prepared by: Guy Jonkmans Atomic Energy of Canada Limited Chalk River ON...INSTALLATION OF THE CANADIAN MUON CARGO INSPECTION SYSTEM AT CRL 153-30100-REPT-001 Revision 0 2013/02/19 UNRESTRICTED 2013/02/19 ILLIMITÉ 153...30100-REPT-001 2013/02/19 Report, General Installation of the Canadian Muon Cargo Inspection System at CRL Research and Development 153-30100

  12. Resistance to ionizing radiations of materials installed at the CERN accelerators

    International Nuclear Information System (INIS)

    Schoenbacher, H.

    1982-01-01

    All materials installed in high energy accelerators along the lines of primary and secondary beams are exposed to ionizing radiation. This can in certain cases cause a degradation of the properties of these materials and consequently affect the good function of the installation. The author has taken at CERN large number of samples of materials in order to determine their radioresistance. Generally the organic materials and the electronic components are more sensitive to ionizing radiation. The author presents the results of these studies which concern the isolations of the cables (polyethylene, polyvinyl chloride, caoutchouc ethylene propylene, etc.), the isolations for the magnets on the base of epoxy resins, as well as other thermoresistant and thermoplastic products. The author equally presents a choice of materials and components which are used at CERN and which are resistant to radiations above an integral dose of 10 7 -10 8 Gy. (orig.)

  13. Tilecal towards the Installation at Cruise Speed

    CERN Multimedia

    Miralles, Ll

    Over the last month the Tile Calorimeter has made a major step in its way towards its assembly in ATLAS. Late February the final EndCap supports were installed and the load (200 Tn) transferred from the assembly cradle to the supports. By mid-March, 32 Endcap modules, 50% of the total with a weight of 350 Tn were pre-assembled in bldg. 185 at CERN. At this stage the assembly is inside its geometrical envelope and the tooling and procedures have been developed. The ATLAS Tile Calorimeter is composed of 3 cylinders ("barrels") of steel, scintillating tiles and optical fibers, altogether about 12 m long, with an outer diameter of 8.4 m, inner diameter of 4.5 m and weighing about 2800 tons. The central cavity will contain the Liquid Argon cryostats, and the whole calorimetry system will measure the direction and energy of jets produced at the LHC, as well as the missing transverse energy, which - as everyone knows - is one of the telltale signals of new and exciting physics. Each of the three cylinders is divid...

  14. Solid targetry at the TESLA Accelerator Installation

    CERN Document Server

    Comor, J J; Rajcevic, M; Kosutic, D; Spasic, M; Vidovic, A; Duricic, J; Nedeljkovic, N

    2002-01-01

    According to the concept of the TESLA Accelerator Installation, the channel for production of radioisotopes has to routinely produce sup 2 sup 0 sup 1 Tl, sup 1 sup 1 sup 1 In, sup 6 sup 7 Ga, sup 1 sup 2 sup 3 I and sup 1 sup 8 F, and a number of other radionuclides for experimental purposes. The production of sup 1 sup 2 sup 3 I and sup 1 sup 8 F will be performed in dedicated, commercial target stations, while a versatile solid target irradiation system is designed for the routine and experimental production of all other radioisotopes. The solid target station is designed to accept targets for both the 7 deg. and 90 deg. irradiation geometry. The targets used for the routine production will be prepared by electroplating on a silver substrate. They can be irradiated with a 1.5 kW beam using the 7 deg. geometry. The cooling of these targets is enhanced by fins on the back of the silver substrate designed so that the highest temperature on the surface of the target does not exceed 110 deg. C. The irradiation ...

  15. Installation of the sag compensator for HANARO

    International Nuclear Information System (INIS)

    Kim, H. K.; Jung, H. S.; Ahn, G. H.; Lim, I. C.

    2008-01-01

    Electric power is essential for all industrial plants and also for nuclear facilities. HANARO is a research reactor which produces a 30MW thermal power. HANARO is designed to be tripped automatically when interruptions or some extents of sags occur. HANARO has the reactor regulation system (RRS) and reactor protection system (RPS). HANARO is designed so as to tripped automatically by insertion of control absorber rods (CAR) and shut-off rods (SOR). When voltage or momentary interruption occurs, the reactor has an unwanted trip by insertion of CARs and SORs even though the process systems are still in operation. HANARO was experienced in a nuisance trip as often as the unexpected voltage sag and/or momentary interruption occurs. We installed the voltage sag compensator on the power supply for CARs and SORs so as to prevent an unwanted trip. We undertook voltage sag assessment of the AC coil contactor which is a component of the power supply unit for the SORs. The compensation time is determined to be less than 1 sec in consideration of the reactor safety. This paper is concerned with the impact of the momentary interruption on the reactor and the effect of the voltage sag compensator

  16. Installation of the sag compensator for HANARO

    International Nuclear Information System (INIS)

    Kim, Hyung Kyoo; Jung, Hoan Sung; Lim, In Cheol; Ahn, Guk Hoon

    2008-01-01

    Electric power is essential for all industrial plants and also for nuclear facilities. HANARO is a research reactor which produces a 30MW thermal power. HANARO is designed to be tripped automatically when interruptions or some extent of sags occur. HANARO has the reactor regulation system(RRs) and reactor protection system(RPS). HANARO is designed so as to be tripped automatically by insertion of control absorber rods(CAR) and shut off rods(SOR). When voltage sag or momentary interruption occurs, the reactor has an unwanted trip by insertion of CARs and SORs even though the process systems are still in operation. HANARO was experienced in a nuisance trip as often as the unexpected voltage sag and/or momentary interruption occurs. We installed the voltage sag compensator voltage sag assessment of the AC coil contactor which is a component of the power supply unit for the SORs. The compensation time is determined to be less than 1 sec in consideration of the reactor safety. This paper is concerned with the impact of the momentary interruption on the reactor and the effect of the voltage sag compensator

  17. Installation of the sag compensator for HANARO

    International Nuclear Information System (INIS)

    Kim, Hyungkyoo; Jung, Hoansung; Lim, Incheol; Ahn, Gukhoon

    2008-01-01

    Electric power is essential for all industrial plants and also for nuclear facilities. HANARO is a research reactor which produces a 30 MW thermal power. HANARO is designed to be tripped automatically when interruptions or some extent of sags occur. HANARO has the reactor regulation system(RRS) and reactor protection system(RPS). HANARO is designed so as to be tripped automatically by insertion of control absorber rods(CAR) and shut-off rods(SOR). When voltage sag or momentary interruption occurs, the reactor has an unwanted trip by insertion of CARs and SORs even though the process systems are still in operation. HANARO was experienced in a nuisance trip as often as the unexpected voltage sag and/or momentary interruption occurs. We installed the voltage sag compensator on the power supply for CARs and SORs so as to prevent an unwanted trip. We undertook voltage sag assessment of the AC coil contactor which is a component of the power supply unit for the SORs. The compensation time is determined to be less than 1 sec in consideration of the reactor safety. This paper is concerned with the impact of the momentary interruption on the reactor and the effect of the voltage sag compensator. (author)

  18. Installation of a second trip system

    International Nuclear Information System (INIS)

    Bessada, E.

    1997-01-01

    Since its first criticality in 1957, the NRU reactor has been operating safely and efficiently supporting the CANDU reactor's research and development programs and producing radioisotopes for medical use. To ensure that the reactor continues to operate safely and effectively, Atomic Energy of Canada Limited (AECL) commissioned a team in 1989 to conduct a systematic review and assessment of the reactor condition. The outcome of the study indicated that the overall condition of the reactor is good and that it is being operated safely. The study also produced recommendations as to where safety can be improved. These recommendations are the basis of the upgrade program currently being implemented in the reactor. The Second Trip System (STS) is part of the upgrade program. It is a stand alone seismically qualified trip system that operates independently from the existing first trip system (FST) to shutdown the reactor. This paper discusses the design, installation and the inactive commissioning of the system, and the process used to ensure that the system can be retrofitted to the reactor without affecting its safety or its operational requirements. (author)

  19. Installation plan report. Auditing and financial system

    Energy Technology Data Exchange (ETDEWEB)

    Feldmiller, W.H.

    1980-01-01

    The U.S. Geological Survey's Conservation Division is responsible for regulating the development of mineral resources on Federal leased land and Indian reservations and for collecting the rents and royalties due from these lands. Development of the Improved Royalty Management Program will help carry out these functions, and a systems design of the Auditing and Financial System (AFS) is developed. Installation of many facets of the AFS will consider some of the problems expected in implementing improvements in the royalty reporting and paying process. The introductory chapter considers changes in regulations, changes in reporting, USGS organizational changes, and computer-system conversions. It also provides a brief summary of the considerations USGS will address in each of these areas. The detailed approach for converting the method of reporting and paying royalties is presented. A description of the file-conversion approach explains how the new system information is obtained. The impact of the USGS organizational changes on personnel in both the old and new offices is discussed. The steps to convert the computer system and the effort required are summarized.

  20. Minimal Technologies Application Project: Planning and installation

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.; Hinchman, R.R.; Severinghaus, W.D.; Johnson, D.O.; Brent, J.J.

    1989-03-01

    Intensive and continuous tactical training during the last 35 years at the Hohenfels Training Area in West Germany has caused the loss of vegetative ground cover and has accelerated soil erosion rates, resulting in extensive environmental damage, safety hazards, and unrealistic training habitats. The objectives of this project are to develop and evaluate revegetation procedures for establishing adequate vegetative cover to control erosion at minimal costs and disruption to training activities. This project involved the development and installation of 12 revegetation procedures that combined four seedbed preparation methods and seeding options with three site-closure periods. In March 1987, the four seedbed preparation/seeding options and closure periods were selected, a study site design and location chosen, and specifications for the revegetation procedures developed. A German rehabilitation contractor attempted the specified seedbed preparation and seeding on the 13.5-ha site in June, but abnormally high rainfall, usually wet site conditions, and lack of adequate equipment prevented the contractor from completing six of the 12 planned procedures. Planning and execution of the project has nonetheless provided valuable information on the importance and use of soil analytical results, seed availability and cost data, contractor equipment requirements, and time required for planning future revegetation efforts. Continued monitoring of vegetative ground cover at the site for the next two years, combined with cost information, will provide necessary data to determine which of the six revegetation procedures is the most effective. These data will be used in planning future rehabilitation efforts on tactical training areas.

  1. Renewable energy sources and nuclear installations

    International Nuclear Information System (INIS)

    Hirschberg, S.; Bauer, Ch.; Burgherr, P.; Stucki, S.; Vogel, F.; Biollaz, S.; Schulz, T.; Durisch, W.; Hardegger, P.; Foskolos, K.; Meier, A.; Schenler, W.

    2005-02-01

    This comprehensive work report for the Swiss Federal Office of Energy (SFOE) made by the Paul Scherrer Institute PSI takes a look at work done in connection with the updating of the office's Energy Perspectives. In particular, the topic of electricity is reviewed in the light of pending important decisions in the area of nuclear energy and the newer renewable sources of energy. The report makes an attempt to estimate the effect on Swiss power production that the new renewables and new nuclear installations could have in the next 30-40 years and to what costs this could be done and which obstacles would have to overcome. The renewable energy sources include small hydro, wind, photovoltaics, solar thermal power plants, biogas, geothermal energy, wave-power and solar chemistry. The methods used include literature study and contacts with internal PSI experts on the various areas involved. The most important system characteristics were noted and learning curves for the various technologies were taken into account. Ecological and social factors were also considered

  2. The solid parahydrogen target for neutron research and the laboratory-scale installation for ortho-parahydrogen conversion

    International Nuclear Information System (INIS)

    Bazhenov, A.I.; Medvedev, V.I.; Pirozhkov, A.N.

    1991-08-01

    The solid parahydrogen target used in the physical experiment on vertical beam of cold polarized neutrons is described. Hydrogen is cooled by means of liquid helium from the supplementary vessel. The construction peculiarity is placing of hydrogen vessel in lateral appendix of cryostat at the 0.7 m distance from the helium vessel. The design of the simple laboratory-scale installation for ortho-parahydrogen conversion operating 'on-line' with target is given. The installation operating with conversion Fe(OH) 3 catalyst gives parahydrogen with content of ortho-component below 0.1%. The procedure of catalyst preparation is described. 7 refs.; 5 figs

  3. Parameters required to maximize a thermoset hydro-generator stator winding life; Part 1: Design, manufacture, installation

    Energy Technology Data Exchange (ETDEWEB)

    Lyles, J.F.; Goodeve, T.E.; Sedding, H.

    1994-09-01

    This paper and companion paper, Part 2 describe the parameters required for a thermoset hydro-generator stator winding to achieve a service life of 50 years. Such parameters covering design, manufacture, installation, on-line monitoring and maintenance functions have been found to be relevant based on 36 years of design and operation experience. The database includes North American, European and Far Eastern hydro generators up to 20.5 kV-500 MVA. Parameters covered can be simply stated as Design, Manufacture and Installation: the DIM rule. A companion paper, Part 2 covers Monitoring and Maintenance: which leads to the DIM rule.

  4. Ship and Installation Program: Optimal Stationing of Naval Ships

    National Research Council Canada - National Science Library

    Colgary, Katherine A; Willett, Devon K

    2006-01-01

    .... Using constraints that maintain adequate pier capacity and unique capability installation, Configuration Analysis seeks to maximize a measure of military value while penalizing excess capacity...

  5. Use and regulatory control of dental X-ray installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    In the guide the safety requirements concerning dental X-ray installations and their use, prerequisities for exemption from a safety licence, and regulatory control are presented. The guide applies to conventional dental X-ray installations, by which an image is created on an X-ray film or other image receptor placed inside the mouth, and panorama tomography installations for dentition and the cephalostats associated with these. The guide does not apply to multitechnique tomography installations intended for the special imaging of the skull or jaws.

  6. Habitat Fragmentation Handbook for Installation Planners: Status and Options

    National Research Council Canada - National Science Library

    Lozar, Robert C; Ehlschlaeger, Charles; Westervelt, James; Balbach, Harold; Akcakaya, H. R; Hoctor, Tom; Goodiso, Crystal; Hargrove, William W; Hoffman, Forrest M; Rose, Winifred

    2006-01-01

    ... for animal Threatened and Endangered Species (TES). The document provides a review of habitat fragmentation issues, focusing on those of highest concern to Army Military Installation Land Managers...

  7. RADAR 2020. Outline of important future developments for installation businesses

    International Nuclear Information System (INIS)

    Pleijster, F.; Braaksma, R.; Van Hoorik, P.; Pikaart, A.; Zwinkels, A.; Muizer, A.

    2010-11-01

    This RADAR focuses on future trends in the broad field of the installation industry with the aim of developing supporting policy for the installation businesses based on the objectives of UNETO-NVO and OTIB. Trends that can be earmarked as relevant for the installation industry are: Social development, Economic development, Technological development, Organizational development, Economic development, and Political development. In this framework, attention is mainly paid to the developments in the following working areas of the installation industry: Climate Engineering, Electrical Engineering, Sanitary engineering, and ICT. [nl

  8. Design and Installation of Irrigation System for the Expansion of Sugar cane- Industries in Ahvaz, IRAN.

    Science.gov (United States)

    Afshari, E.; Afshari, S.

    2005-12-01

    This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.

  9. IPPC installations in France and limit values of emission; Installations IPPC en France et valeurs limites d'emission

    Energy Technology Data Exchange (ETDEWEB)

    Soleille, S

    2004-07-15

    The IPPC directive of the 24 September 1996 asked for the main european industrial installations an authorization. This authorization fixes limit values for pollutant emissions. In France, the main industrial installations are controlled since many years in the framework of the regulation on classified installations for the environment protection (ICPE). This report compares the limit values of emissions for the national and prefectorial orders and for the IPPC directive. (A.L.B.)

  10. Work-related injuries in drywall installation.

    Science.gov (United States)

    Lipscomb, H J; Dement, J M; Gaal, J S; Cameron, W; McDougall, V

    2000-10-01

    Administrative data sources were used to describe the work-related injuries of drywall carpenters, to calculate rates of occurrence, and to explore high risk sub-groups. Health insurance eligibility files were used to identify a cohort of active union carpenters affiliated with a union local whose predominant work involved drywall installation in the state of Washington. These files contained the hours worked by each individual for each month between January 1989 and December 1995, providing person-hours at risk as a union carpenter. The Washington Department of Labor and Industries (L&I) provided records of workers' compensation claims filed by these individuals. Over seven years 1773 drywall carpenters filed 2567 workers' compensation claims representing an overall rate of 53.3 per 200,000 hours worked. These claims were filed by 1046 different individuals, or 59.0 percent of the cohort. Claims resulting in paid lost time from work were filed at a rate of 12.5 per 200,000 hours worked (n = 609) by 445 (25.1%) different individuals. The most common mechanisms of injury involved being struck (38.3%), overexertion (28.1%), and falls (13.2%). Struck by injuries most commonly involved cuts to the upper extremity. Overexertion injuries were most commonly described as sprains or strains involving the back. Sheetrock was associated with over 40 percent of these injuries. Falls most commonly involved injuries to the knee followed by the back and multiple injuries. Struck by injuries decreased steadily with increasing age and increasing time in the union. There was a steady increase in the rate of falls with increasing age. Overexertion injuries were responsible for the greatest proportion of costs for medical care, permanent impairment, and paid lost days. The high rates of overexertion injuries among these workers is consistent with known ergonomic stresses on drywall jobs. However, these workers are also at high risk of acute traumatic injuries.

  11. Regulatory Safety Requirements for Operating Nuclear Installations

    International Nuclear Information System (INIS)

    Gubela, W.

    2017-01-01

    The National Nuclear Regulator (NNR) is established in terms of the National Nuclear Regulator Act (Act No 47 of 1999) and its mandate and authority are conferred through sections 5 and 7 of this Act, setting out the NNR's objectives and functions, which include exercising regulatory control over siting, design, construction etc of nuclear installations through the granting of nuclear authorisations. The NNR's responsibilities embrace all those actions aimed at providing the public with confidence and assurance that the risks arising from the production of nuclear energy remain within acceptable safety limits -> Therefore: Set fundamental safety standards, conducting pro-active safety assessments, determining licence conditions and obtaining assurance of compliance. The promotional aspects of nuclear activities in South Africa are legislated by the Nuclear Energy Act (Act No 46 of 1999). The NNR approach to regulations of nuclear safety and security take into consideration, amongst others, the potential hazards associated with the facility or activity, safety related programmes, the importance of the authorisation holder's safety related processes as well as the need to exercise regulatory control over the technical aspects such as of the design and operation of a nuclear facility in ensuring nuclear safety and security. South Africa does not have national nuclear industry codes and standards. The NNR is therefore non-prescriptive as it comes to the use of industry codes and standards. Regulatory framework (current) provide for the protection of persons, property, and environment against nuclear damage, through Licensing Process: Safety standards; Safety assessment; Authorisation and conditions of authorisation; Public participation process; Compliance assurance; Enforcement

  12. An analytical framework for handling production time variety at workstations of mixed-model assembly lines

    OpenAIRE

    Keckl, Stefan; Kern, Wolfgang; Abou-Haydar, A.; Westkämper, Engelbert

    2016-01-01

    In recent years market demands have shifted towards customized products. As a result many manufacturing companies face an increasing variety of their product range. As it is not profitable to install new assembly lines for each product, assembly lines have to be able to handle different products in batch size one. In literature these lines are called mixed-model lines. They follow the logical principal of flow production but are capable of producing different products while needing minimal mo...

  13. 49 CFR 236.723 - Circuit, double wire; line.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Circuit, double wire; line. 236.723 Section 236.723 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION...

  14. Video Installation, Memory and Storytelling: the viewer as narrator

    Directory of Open Access Journals (Sweden)

    Diane Charleson

    2011-05-01

    Full Text Available

    line-height: 150%; margin: auto 0cm 6pt;">Abstract: Much has been written about memory and its link with the visual where memory is likened to our recollection of vignettes or visual traces. Conway (1999 tells us that the brain takes in experience as word and image.  Gibson (2002 suggests that “imagistic cognition” is a process whereby we run image sequences through our heads while trying to make sense of experience. He links this psychological phenomenon with notions of film editing theory and practice. He goes on to suggest that the power of the cinema is linked to this primal experience of remembering that elicits the intense pleasures of childhood and access to a means of navigating the self. This paper will explore the role video installation can play in creating an open, enticing, non-threatening and immersive environment, where viewers can transcend the everyday, reflect on their own memories and recall their personal stories. I will argue that there is a symbiotic link between what I will call the viewer as flâneur and the producer of the work such that a new form of storytelling can be created through this relationship.

    line-height: 150%; margin: auto 0cm 6pt;">Résumé: Il existe une littérature abondante sur les liens entre la mémoire et l'image, notamment en ce qui concerne le traitement de traces visuelles par les fonctions mémorielles. Conway (1999 insiste quant à lui sur le fait que le

  15. The control of base nuclear installations; Le controle des installations nucleaires de base (INB)

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2009-04-15

    The Authority of Nuclear Safety ( A.S.N). presents in this column the current events of the control of the nuclear base installations during november, december 2008 and january 2009, classified by nuclear site. This information is also available in real-time on the A.S.N. web site, www.asn.fr, in the column 'news'. We can consult all the notices of significant incident published as well as the following letters of inspection, the notices of information about the reactors shutdown, press releases and the A.S.N. information notes. (N.C.)

  16. 30 CFR 77.509 - Transformers; installation and guarding.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...

  17. 26 CFR 49.4253-7 - Exemption for installation charges.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Exemption for installation charges. 49.4253-7... installation charges. (a) In general. The taxes imposed by section 4251 do not apply to any amount paid as is... equipment. (b) Maintenance charges subject to tax. The exemption provided by section 4253(g) and paragraph...

  18. Level-Oriented Diagnosis for Indoor Climate Installations

    NARCIS (Netherlands)

    Yu, B.

    2003-01-01

    Indoor climate installations are widely used in modern office buildings. Statistical data show that the energy consumption in buildings has grown quickly in the past decades. A considerable part is due to inefficient and improper operations of installations. Therefore, Fault Detection and Diagnosis

  19. Progress Report 1 January 1983 - 31 December 1984. Computer Installation

    DEFF Research Database (Denmark)

    Risø National Laboratory, Roskilde

    This report describes selected parts of the activities at the Computer Installation of Risa National Laboratory in 1983 and 1984. Information given may be preliminary.......This report describes selected parts of the activities at the Computer Installation of Risa National Laboratory in 1983 and 1984. Information given may be preliminary....

  20. Installation, care, and maintenance of wood shake and shingle roofs

    Science.gov (United States)

    Tony Bonura; Jack Dwyer; Arnie Nebelsick; Brent Stuart; R. Sam Williams; Christopher Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shake and shingle roofs. The authors have gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle roofs, and interviews with experts having...

  1. Installation, care, and maintenance of wood shake and shingle siding

    Science.gov (United States)

    Jack Dwyer; Tony Bonura; Arnie Nebelsick; Sam Williams; Christopher G. Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shakes and shingles. The authors gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle siding, and interviews with experts having...

  2. Philosophy and safety requirements for land-based nuclear installations

    International Nuclear Information System (INIS)

    Kellermann, Otto

    1978-01-01

    The main ideas of safety philosophy for land-based nuclear installations are presented together with their background of protection goals. Today's requirements for design and quality assurance are deductively shown. Finally a proposition is made for a new balancing of safety philosophy according to the high safety level that nuclear installations have reached

  3. Plutonium: resuspension of aerosols in nuclear installations: bibliographic survey

    International Nuclear Information System (INIS)

    Guetat, Ph.; Monfort, M.; Armand, P.; Alloul-Marmor, L.

    2006-01-01

    This document presents an analysis and a bibliographical synthesis of the studies on resuspension factors for plutonium. It aims at helping the engineers of safety to specify the scenarios of accidents which relate to their activities and to bring elements justified for the definition of their term-source 'installation' in the safety reports of the installations. (authors)

  4. 30 CFR 75.310 - Installation of main mine fans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of main mine fans. 75.310 Section... mine fans. (a) Each main mine fan shall be— (1) Installed on the surface in an incombustible housing... that gives a signal at the mine when the fan either slows or stops. A responsible person designated by...

  5. You're a What? Solar Photovoltaic Installer

    Science.gov (United States)

    Torpey, Elka Maria

    2009-01-01

    This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…

  6. Framework for Modelling Multiple Input Complex Aggregations for Interactive Installations

    DEFF Research Database (Denmark)

    Padfield, Nicolas; Andreasen, Troels

    2012-01-01

    We describe a generalized framework as a method and design tool for creating interactive installations with a demand for exploratory meaning creation, not limited to the design stage, but extending into the stage where the installation meets participants and audience. The proposed solution is bas...

  7. 46 CFR 58.20-15 - Installation of refrigerating machinery.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Installation of refrigerating machinery. 58.20-15 Section 58.20-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Refrigeration Machinery § 58.20-15 Installation of refrigerating machinery. (a) Where refrigerating...

  8. An Administrator's Guide to Installing a Telephone System.

    Science.gov (United States)

    Forbes, Phyllis Rossiter

    1986-01-01

    Guidelines for administrators concerning installation of a new campus telephone system address these issues: where to start; location and emergency power; the project team; paperwork; communication among those involved in installation; working with the local operating company; existing wiring; the external cable plant; special needs; and training…

  9. Bridging interpersonal installation art with tangible business modeling

    DEFF Research Database (Denmark)

    Mitchell, Robb

    2012-01-01

    This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction.......This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction....

  10. 14 CFR 25.1353 - Electrical equipment and installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...

  11. 14 CFR 29.1353 - Electrical equipment and installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...

  12. Fuel pins volume measuring installation in hot cells

    International Nuclear Information System (INIS)

    Prokudanov, D.L.; Troitskii, S.V.

    1987-11-01

    The NIIAR Institute has elaborated a method and concepted an installation for determining precisely the fuel pin volume. This determination is based on a fluid measurement level by ultrason. The operation principle and the installation diagram are indicated in this document [fr

  13. Forecasting Climate-Induced Ecosystem Changes on Military Installations

    Science.gov (United States)

    James D. Westervelt; William W. Hargrove

    2011-01-01

    Military installation training lands must be managed to support species at risk as well as to be effective training environments for soldiers. Forecasts from various global climate change models suggest that the habitats associated with some military training installations will face pressures that induce biome-shifts, invasive species, loss of habitat, and changes in...

  14. Progress Report. 1 January 1981 - 31 December 1982. Computer Installation

    DEFF Research Database (Denmark)

    Risø National Laboratory, Roskilde

    This report describes selected parts of the activities at the Computer Installation of Risø National Laboratory in 1981 and 1982. Information given may be preliminary.......This report describes selected parts of the activities at the Computer Installation of Risø National Laboratory in 1981 and 1982. Information given may be preliminary....

  15. 46 CFR 195.03-1 - Installation and details.

    Science.gov (United States)

    2010-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 195.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of... (Marine Engineering) of this chapter. Systems of this type include the following: Steering Systems. Bilge...

  16. Annual report 1 January - 31 December 1978 computer installation

    International Nuclear Information System (INIS)

    1979-05-01

    The computer installation of Risoe National Laboratory functions as an internal service bureau. The staff is concentrated around operating the computer and providing expertise in the fields of numerical mathematics, statistics, operation research, systems software, and software engineering. Selected parts of the activities at the Computer Installation are described. (B.P.)

  17. 32 CFR 634.25 - Installation traffic codes.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic...

  18. The Houston Lightning Mapping Array: Installation, Operation, and Preliminary Results

    Science.gov (United States)

    Orville, R. E.; Cullen, M. R.; Rodeheffer, D.; Krehbiel, P. R.; Rison, W.

    2012-12-01

    The Houston Lightning Mapping Array (LMA) was established in April 2012 and is a network of twelve time-of-arrival lightning sensors operating in the VHF around Houston, Texas. The network sensors are built by New Mexico Institute of Mining and Technology. Built stand-alone units, these LMA sensors use solar panels and cellular data modems for Internet connectivity. This enables the units to be placed in strategic locations at sites to minimize noise and interference by reducing dependence on wired power or communications lines. Twelve sensors are distributed around the Houston and provide total lightning data for the fourth most populated American city. The primary research goals of the network are to investigate the structure of total lightning within thunderstorm development and to examine any potential impact of the urban environment on lightning characteristics. Furthermore, the proximity to the coast and the Gulf of Mexico presents the opportunity to examine the total lightning structure within tropical cyclones that impact the Texas coastline. The availability of real-time LMA data provides a decision support tool for advanced warning of thunderstorm development. We present efforts with the Houston/Galveston Weather Forecast Office and the Spaceflight Meteorology Group at Johnson Space Center to integrate the real-time LMA data into operational display software. The network of 12 sensors has been operating continuously since installation in mid-April with 10 sensors surrounding the Houston area plus one in College Station and one in Galveston. Analysis of recent data will investigate three-dimensional thunderstorm activity.

  19. Installing Ubuntu Enterprise Cloud in a Physical Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to “Guidelines for Building a Private Cloud Infrastructure.” This supplemental material provides guidance on how to install Ubuntu Enterprise Cloud in a physical environment. The purpose of this document is to provide a practical, step...... with screenshots. The material included in this supplemental document is based on the installation that was performed in a physical environment based on HP ProLiant DL380 G4 servers, 100 Mbit/s witches, and a firewall/router that isolated the whole solution. The cloud installation was performed using the (for...... the time being) newest version of the UEC, based on the Ubuntu 11.04. The installation was performed using “CD Install” method (otherwise, there was also a “Package Install” method ). This material in this document is based on Eucalyptus version installed is 2.0.2....

  20. Installation and Preliminary Test of the Ion Accelerator for the Surface Analysis at KOMAC

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Il; Ahn, Tae Sung; Seo, Dong Hyuk; Kwon, Hyeok Jung; Kim, Cho Rong; Park, Jun Kue; Cho, Yong Sub [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    An electrostatic tandem accelerator, which had been operating over 25 years at KIGAM (Korea Institute of Geoscience and Mineral Resources), is moved to KOMAC (Korea Multi-purpose Accelerator Complex) last year. For the purpose of supplying the qualified and quantified data from the irradiated species as part of the user service of KOMAC. The accelerator is a pelletron with tandem type. The ion accelerator for surface analysis was moved at KOMAC last year. The installation with alignment was done. The conditioning of high voltage was operated up to 1.7 MV. The beam transmission to PIXE beam line was achieved as 51%.

  1. First-order aerodynamic and aeroelastic behavior of a single-blade installation setup

    DEFF Research Database (Denmark)

    Gaunaa, Mac; Bergami, Leonardo; Guntur, Srinivas

    2014-01-01

    the first-order aerodynamic and aeroelastic behavior of a single blade installation system, where the blade is grabbed by a yoke, which is lifted by the crane and stabilized by two taglines. A simple engineering model is formulated to describe the aerodynamic forcing on the blade subject to turbulent wind...... of arbitrary direction. The model is coupled with a schematic aeroelastic representation of the taglines system, which returns the minimum line tension required to compensate for the aerodynamic forcing. The simplified models are in excellent agreement with the aeroelastic code HAWC2, and provide a solid basis...

  2. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2002-01-01

    The Health and Safety Executive (HSE) presents the statement of nuclear incidents at nuclear installations published under the Health and Safety Commission's powers derived from section 11 of the Health and Safety at Work, etc. Act 1974. INCIDENT 02/4/1. Harwell (United Kingdom Atomic Energy Authority) On 6 November 2002 during operations in a glove box in B220, the over pressure alarm sounded. The operators evacuated and shortly afterwards the airborne activity monitors also sounded. The building emergency arrangements for airborne activity alarms was initiated to ascertain the source and to manage the operations. An investigation by UKAEA confirmed that a release of Americium 241 into the working area had occurred at a quantity in excess of Schedule 8 column 4 of the Ionising Radiations Regulations 1999 (IRRs). A number of personnel have received intakes including the two operators and the health physics personnel who attended the event. The highest dose (up to 6 mSv.) was received by the Health Physics charge hand. UKAEA placed an embargo on the use of similar systems and have completed their own management investigation and produced an internal report. It concludes that the likely cause of the event was over-pressurisation of the vacuum equipment used in the process. The report also highlights improvements required to the ventilation system in the laboratory and adjoining areas. An action plan has been developed for this work and progress is being made. NIl has followed the UKAEA investigation and carried out its own study including a visit by a ventilation specialist. This has confirmed the problems with the ventilation system. It is a complex issue that may have a wider impact across the building. A letter has been sent to UKAEA detailing a series of short-term requirements and the need to review implications and produce a longer-term action plan. UKAEA is cooperating fully with these requirements. INCIDENT 02/4/2. Dounreay (United Kingdom Atomic Energy

  3. Development regulation regarding with licensing of nuclear installation

    International Nuclear Information System (INIS)

    Bambang Riyono; Yudi Pramono; Dahlia Cakrawati Sinaga

    2011-01-01

    Provisions of Article 17 paragraph (3) of Law Number 10 Year 1997 on Nuclear cleary mandates for the establishment of government regulations (GR) on Nuclear licensing containing the requirements and procedure, both from the standpoint of their utilization and installation. To use has been rising GR No.29 Year 2008 on the Use of Ionizing Radiation Sources and Nuclear Materials, while for the installation has been published PP No.43 Year 2006 on Nuclear Reactor Licensing, and BAPETEN Chairman Decree No.3 Year 2006 on Non-reactor Nuclear Installation Licensing. Based on the background of the preparation of both the aforementioned are just regulate the reactor and utilization, not yet fully meet the mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear, including other nuclear installations. For these reasons, it initiated the need for a separate regulation containing provisions concerning licensing of non-reactor nuclear installations. On the other side from the understanding the legal aspects and interpretations of the Law No.10 of 2004 on the Establishment Regulation Legislation, should be in single mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear would only produce one of the requirements and procedure for the use or installation, or a maximum of two (2) GR related licensing the use and installation. This is encourages conducted the assessing or studies related to how possible it is according to the legal aspect is justified to combine in one Nuclear licensing regulations regarding both the use and installation, by looking at the complexity of installation and wide scope of utilization of nuclear energy in Indonesia. The results of this paper is expected to provide input in the preparation of GR on licensing of nuclear installations. (author)

  4. Groundwater quality monitoring well installation for Waste Area Groupings 8 and 9 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of nine groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 8 and two GQM wells on the perimeter of WAG 9. WAG 8 encompasses approximately 34 acres, most of which are located in Melton Valley. Irregular in shape, the site has two sinuous extensions from its northern end that contain the low-level radioactive waste (LLW) transfer lines. WAG 8 contains 22 solid waste management units (SWMUs) that can be divided into 4 groups. These groups include the High Flux Isotope Reactor/Transuranium Processing Facility waste collection basins, the LLW line leak sites, and the active LLW tanks. WAG 9 encompasses about 3 acres and is located west of the main portion of WAG 8 and south of Melton Valley Drive. WAG 9 contains four SWMUs. The wells in WAGs 8 and 9 were drilled and developed from June 1989 to March 1990. Monitoring wells were installed to characterize and assess the WAGs in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAGs 8 and 9. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  5. Demonstration of a utility industry horizontal drilling system: Horizontal well AMH-5 installation report

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of VOCs in soils and groundwater at the Savannah River Site (SRS) in 1989. The overall goal of the program is demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program. Directional drilling has been shown to be a successful technique for enhancing access to the subsurface, thus improving remediation systems, especially remediation systems which perform in situ. Demonstration of an innovative directional drilling system at the Integrated Demonstration Site at the SRS, was initiated in June of 1992. The directional drilling system was designed to install an in situ remediation system. The drilling system is an experimental compaction/dry drilling technique developed by Charles Machine Works (Ditch Witch reg-sign) of Perry, Oklahoma. A horizontal well was installed in the M Area of the SRS below and parallel to an abandoned tile process sewer line. The installation of the horizontal well was a two-part process. Part one consisted of drilling the borehole, and part two was the horizontal well completion

  6. The imaginary worlds of sustainability: observations from an interactive art installation

    Directory of Open Access Journals (Sweden)

    Roy Bendor

    2017-06-01

    Full Text Available We report on preliminary results from a public engagement project based on a procedural approach to sustainability. The project centered on an interactive art installation that comprised a live actor, an immersive soundscape featuring a handful of different characters, an interactive touch-table, and four interactive rooms within which participants wandered, partially guided by a narrative through-line, yet at the same time left to make sense of any larger meanings on their own. The installation was designed to experiment with two propositions: (1 that there is value in public engagement with sustainability based on the exploration and articulation of deeply held beliefs about the world - the worldviews, values, and presuppositions that mediate perception and action; (2 that there is value in replacing the infocentric tendency of most public engagement on sustainability with an approach premised in aesthetics and experiential resonance. Following the installation's two-week pilot run, our preliminary results indicated that the majority of participants found the experience both resonant and thought provoking, and were mostly willing to critically engage with their pre-existing notions of sustainability.

  7. Nuclear installations abroad the accident risks and their potential consequences

    International Nuclear Information System (INIS)

    Turvey, F.J.

    1996-01-01

    This paper endeavors to assess the threat to Ireland from severe accidents at civil nuclear installations. Among the various types of nuclear installations worldwide, reactors and reprocessing plants are considered to be the most threatening and so the paper focuses on these. The threat is assumed to be a function of the risk of severe accidents at the above types of installations and the probability of unfavourable weather conditions carrying the radioactive releases to Ireland. Although nuclear installations designed in eastern Europe and Asia are less safe than others, the greatest threat to Ireland arises from nearby installations in the UK. The difficulty of measuring the probabilities and consequences of severe nuclear accidents at nuclear installations in general is explained. In the case of the UK installations, this difficulty is overcome to some degree by using values of 'tolerable' risk adopted by the national nuclear regulator to define the radiotoxic releases from nuclear accidents. These are used as input to atmospheric dispersion models in which unfavourable weather conditions for Ireland are assumed and radiation doses are calculated to members of the Irish public. No countermeasures, such as sheltering, are assumed. In the worst cast scenario no deaths would be expected in Ireland in the immediate aftermath of the accident however, an increase in cancers over a period of 25 years or so would be expected assuming present-day models for the effect of low level radiation are valid

  8. Disturbances during minirhizotron installation can affect root observation data

    Energy Technology Data Exchange (ETDEWEB)

    Joslin, J.D.; Wolfe, M.H. [Tennessee Valley Authority, Norris, TN (United States)

    1999-01-01

    Use of minirhizotrons in forested ecosystems has produced considerable information on production, mortality, distribution, and the phenology of root growth. But installation of minirhizotrons severs roots and disturbs soil, which can cause root proliferation in perennial plants. The authors compared the magnitude and vertical distribution of root growth observations in a mature hardwood forest during the growing season immediately after minirhizotron installation with observations more than two years later. They also compared the vertical root growth distribution during these two different years with the preinstallation distribution of fine root biomass. Before minirhizotron installation and again two years later, about 74% of fine root biomass was in the upper 30 cm of soil, but immediately after installation, 98% of the root elongation was in the upper 30 cm. Large differences in the quantity of root elongation were observed across different slope positions in the minirhizotron data from the first growing season (approximately four times greater on the upper slope as the lower slope). Such differences with slope position were not sen in the later minirhizotron data, nor in the preinstallation fine root biomass data. The evidence suggests that the minirhizotron data collected immediately after installation can be biased by disturbance of roots and soil during installation, which result in excessive root proliferation, particularly near the soil surface. Root proliferation appears to be the result of a response to both root pruning and to nutrient release in microsites near the newly installed minirhizotron.

  9. Conceptual design report for the project to install leak detection in FAST-FT-534/548/549

    Energy Technology Data Exchange (ETDEWEB)

    Galloway, K.J.

    1992-07-01

    This report provides conceptual designs and design recommendations for installing secondary containment and leak detection systems for three sumps at the Fluorinel and Storage Facility (FAST), CPP-666. The FAST facility is located at the Idaho Chemical Processing Plant (ICPP) at the Idaho National Engineering Laboratory (INEL). The three sumps receive various materials from the FAST water treatment process. This project involves sump upgrades to meet appropriate environmental requirements. The steps include: providing sump modifications or designs for the installation of leak chases and/or leakage accumulation, coating the sump concrete with a chemical resistant sealant (except for sump VES-FT-534 which is already lined with stainless steel) to act as secondary containment, lining the sumps with a primary containment system, and providing a means to detect and remove primary containment leakage that may occur.

  10. Conceptual design report for the project to install leak detection in FAST-FT-534/548/549

    International Nuclear Information System (INIS)

    Galloway, K.J.

    1992-07-01

    This report provides conceptual designs and design recommendations for installing secondary containment and leak detection systems for three sumps at the Fluorinel and Storage Facility (FAST), CPP-666. The FAST facility is located at the Idaho Chemical Processing Plant (ICPP) at the Idaho National Engineering Laboratory (INEL). The three sumps receive various materials from the FAST water treatment process. This project involves sump upgrades to meet appropriate environmental requirements. The steps include: providing sump modifications or designs for the installation of leak chases and/or leakage accumulation, coating the sump concrete with a chemical resistant sealant (except for sump VES-FT-534 which is already lined with stainless steel) to act as secondary containment, lining the sumps with a primary containment system, and providing a means to detect and remove primary containment leakage that may occur

  11. Overview of the Development and Installation of KEPCO Enhanced Power System Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Y.B.; Jang, G.S.; Cha, S.T. [Korea Electric Power Research Institute, Taejon (Korea)

    1999-07-01

    This paper describes design, development and implementation details of a large scale power system simulator being installed at the Kore Electric Power Research Institute. The so-called KEPCO Enhanced Power System Simulator (KEPS) will include both off line (i.e. non-real time) and on line (real time) simulation capabilities and will be used by KEPRI to study various aspects of the growing power network in Korea. A Real Time Digital simulator based on the well known RTDS hardware and software architecture will form the core of the KEPS system. A number of developments and enhancements will made to the fundamental simulation technology in order to meet some of the special requirements defined in the KEPS project. (author). 5 refs., 4 figs.

  12. Installation of Ohio's First Electrolysis-Based Hydrogen Fueling Station

    Science.gov (United States)

    Scheidegger, Brianne T.; Lively, Michael L.

    2012-01-01

    This paper describes progress made towards the installation of a hydrogen fueling station in Northeast Ohio. In collaboration with several entities in the Northeast Ohio area, the NASA Glenn Research Center is installing a hydrogen fueling station that uses electrolysis to generate hydrogen on-site. The installation of this station is scheduled for the spring of 2012 at the Greater Cleveland Regional Transit Authority s Hayden bus garage in East Cleveland. This will be the first electrolysis-based hydrogen fueling station in Ohio.

  13. Assembly and installation of the Belle II TOP detector

    Science.gov (United States)

    Suzuki, Kazuhito; Belle II TOP Group

    2017-12-01

    The Time-of-Propagation (TOP) detector is a new type of ring-imaging Cherenkov detector developed for particle identification in the barrel region of the Belle II spectrometer. In the assembly and installation, it is crucial for the detector performance to achieve precision alignment and secure gluing of the optical components as well as to mechanically support them managing the stress, attitude, optical and electrical contacts, and limited installation space. Various efforts were made to develop the procedures and jigs along with the development of the mechanical structure. Such efforts accomplished the assembly and installation in April and May 2016, respectively, without a significant incident.

  14. Self and world: large scale installations at science museums.

    Science.gov (United States)

    Shimojo, Shinsuke

    2008-01-01

    This paper describes three examples of illusion installation in a science museum environment from the author's collaboration with the artist and architect. The installations amplify the illusory effects, such as vection (visually-induced sensation of self motion) and motion-induced blindness, to emphasize that perception is not just to obtain structure and features of objects, but rather to grasp the dynamic relationship between the self and the world. Scaling up the size and utilizing the live human body turned out to be keys for installations with higher emotional impact.

  15. Preliminary assessment report for Waiawa Gulch, Installation 15080, Pearl City, Oahu, Hawaii. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Hawaii Army National Guard (HIARNG) property near Pearl City, Oahu, Hawaii. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Waiawa Gulch property, phase I of the Department of Defense Installation Restoration Program (IRP).

  16. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead.

  17. Preliminary assessment report for Camp Swift Military Reservation, Installation 48070, Bastrop County, Texas. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard property in Bastrop County, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Camp Swift property, the requirement of the Department of Defense Installation Restoration Program (IRP). The review of both historical and current practices at the property indicated that the activities at Camp Swift include no operations considered to have an adverse impact to the environment. The recommendation, therefore, is that no further IRP action is necessary at this property.

  18. Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

  19. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  20. Zenith distribution and flux of atmospheric muons measured with the 5-line ANTARES detector

    NARCIS (Netherlands)

    Aguilar, J.A.; et al., [Unknown; Kooijman, P.; Lim, G.; Palioselitis, D.; Presani, E.; Wijnker, G.; de Wolf, E.

    2010-01-01

    The ANTARES high-energy neutrino telescope is a three-dimensional array of about 900 photomultipliers distributed over 12 mooring lines installed in the Mediterranean Sea. Between February and November 2007 it acquired data in a 5-line configuration. The zenith angular distribution of the

  1. VT Electric Transmission Line Corridors - corridor lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  2. Lined canvas paintings

    DEFF Research Database (Denmark)

    Krarup Andersen, Cecil

    2013-01-01

    This work evaluates the lining history of the Danish Golden Age collection of canvas paintings from the nineteenths century at SMK, The National Gallery of Denmark, and seeks to understand the moisture sensitivity of the paintings before and after lining. This is done by chemical analysis...... and tensile testing samples from the tacking edges as well as lined mock-up samples. The ability of the different lining techniques to support canvas paintings is evaluated in terms of their initial stretching and during fluctuations of relative humidity. Six different combinations of lining adhesives...... and textiles were examined. These included the adhesives Beva 371, Plextol D360, wax-resin, and glue-paste. The lining textiles were linen and polyester sailcloth. A naturally aged canvas painting and a modern painting were lined using these materials and methods. Testing of the lined paintings included uni...

  3. Lined canvas paintings

    DEFF Research Database (Denmark)

    Krarup Andersen, Cecil

    2013-01-01

    and tensile testing samples from the tacking edges as well as lined mock-up samples. The ability of the different lining techniques to support canvas paintings is evaluated in terms of their initial stretching and during fluctuations of relative humidity. Six different combinations of lining adhesives...

  4. Installation of the LHC Long Straight Sections (LSS)

    CERN Document Server

    Bartolome-Jimenez, Sonia

    2005-01-01

    The LHC long straight sections (LSS) serve as experimental or utility insertions. There are two high luminosity experimental insertions located at points 1 and 5 and two more experimental insertions at points 2 and 8 which also contain the injection systems. The beams only cross at these four locations and are focused by superconducting low-beta triplets. Insertions 3 and 7 each contain two collimation systems. Insertion 4 contains two RF systems. Insertion 6 contains the beam dumping system. The installation of the LSS is a challenge due to the compact layout that characterises these areas and the difficulties related to the underground work mainly in zones of restricted access. Specific devices are required for handling and installing various heavy and voluminous elements. This paper reviews the installation scenarios, describes the sequences presently planned and highlights the potential problem areas. The particular case of sector 7-8 where the LSS elements will be installed in parallel with the cryogenic...

  5. INSTALLATION OF THE LHC LONG STRAIGHT SECTIONS (LSS)

    CERN Document Server

    Bartolome-Jimenez, S

    2005-01-01

    The LHC long straight sections (LSS) serve as experimental or utility insertions. There are two high luminosity experimental insertions located at Point 1 and 5 and two more experimental insertions at Point 2 and 8 which also contain the injection systems. The beams only cross at these four locations and are focused by superconducting low-beta triplets. Insertions 3 and 7 each contain two collimation systems. Insertion 4 contains two RF systems. Insertion 6 contains the beam dumping system. The installation of the LSS is a challenge due to the compact layout that characterise these areas and the difficulties related to the underground work mainly in zones of restricted access. Specific devices are required for handling and installing various heavy and voluminous elements. This paper reviews the installation scenarios, describes the sequences presently planned and highlights the potential problem areas. The particular case of sector 7-8 where the LSS elements will be installed in parallel with the cryogenic di...

  6. Development of cryogenic installations for large liquid argon neutrino detectors

    CERN Document Server

    Adamowski, M; Geynisman, M; Hentschel, S; Montanari, D; Nessi, M; Norris, B

    2015-01-01

    A proposal for a very large liquid argon (68,000 kg) based neutrino detector is being studied. To validate the design principles and the detector technology, and to gain experience in the development of the cryostats and the cryogenic systems needed for such large experiments, several smaller scale installations will be developed and implemented, at Fermilab and CERN. The cryogenic systems for these installations will be developed, constructed, installed and commissioned by an international engineering team. These installations shall bring the required cooling power under specific conditions to the experiments for the initial cool-down and the long term operation, and shall also guarantee the correct distribution of the cooling power within the cryostats to ensure a homogeneous temperature distribution within the cryostat itself. The cryogenic systems shall also include gaseous and liquid phase argon purification devices to be used to reach and maintain the very stringent purity requirements needed for these...

  7. Position Errors of the Service Airspeed Installations of 10 Airplanes

    National Research Council Canada - National Science Library

    Gracey, William

    1949-01-01

    .... The installations are representative of most of the systems in use at the present time and include static-pressure vents on the nose and the rear section of the fuselage and pitot-static tubes...

  8. Legal bases for the installation of nuclear power plants

    International Nuclear Information System (INIS)

    Faria, N.M. de; Barros, E.A.

    1980-01-01

    The role of the National Nuclear Energy Comission, the National Department of Water and Electrical Energy and the 'Centrais Eletricas Brasileiras S.A.' for the installation of Nuclear Power Plants is presented. (A.L.) [pt

  9. Offshore Wind Energy Cost Modeling Installation and Decommissioning

    CERN Document Server

    Kaiser, Mark J

    2012-01-01

    Offshore wind energy is one of the most promising and fastest growing alternative energy sources in the world. Offshore Wind Energy Cost Modeling provides a methodological framework to assess installation and decommissioning costs, and using examples from the European experience, provides a broad review of existing processes and systems used in the offshore wind industry. Offshore Wind Energy Cost Modeling provides a step-by-step guide to modeling costs over four sections. These sections cover: ·Background and introductory material, ·Installation processes and vessel requirements, ·Installation cost estimation, and ·Decommissioning methods and cost estimation.  This self-contained and detailed treatment of the key principles in offshore wind development is supported throughout by visual aids and data tables. Offshore Wind Energy Cost Modeling is a key resource for anyone interested in the offshore wind industry, particularly those interested in the technical and economic aspects of installation and decom...

  10. Prototype road weather performance management tool : installation instructions & user manual.

    Science.gov (United States)

    2016-07-20

    This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...

  11. Siren system installed to alert campus community to emergency events

    OpenAIRE

    Miller, Allan

    2006-01-01

    Virginia Tech is installing a system of warning sirens to alert the campus community to emergency events. The first test of the siren system is scheduled to occur on Wednesday, April 19, at 12:10 p.m.

  12. 46 CFR 115.702 - Installation tests and inspections.

    Science.gov (United States)

    2010-10-01

    ... CERTIFICATION Repairs and Alterations § 115.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or...

  13. Regulations of local choices for installation of power reactors

    International Nuclear Information System (INIS)

    1969-09-01

    The present regulations specify the criteria under which the Comissao Nacional de Energia Nuclear will approve the local proposed for the installation of power reactors, according to his attributions established in the Law 4118, dated of August 27, 1962

  14. Disturbances During Minirhizotron Installation Can Affect Root Observation Data

    Energy Technology Data Exchange (ETDEWEB)

    J. Devereux Joslin; Mark H. Wolfe

    1999-01-31

    Comparison of the magnitude and vertical distribution of root growth observation in a mature hardwood forest during the growing season immediately after minirhizotron installation with observations more than two years later.

  15. Characterization of double face adhesive sheets for ceramic tile installation

    International Nuclear Information System (INIS)

    Nascimento, Otavio L.; Mansur, Alexandra A.P.; Mansur, Herman S.

    2011-01-01

    The main goal of this work was the characterization of an innovative ceramic tile installation product based on double face adhesive sheets. Density, hardness, tensile strength, x-ray diffraction, infrared spectroscopy, and scanning electron microscopy coupled with spectroscopy of dispersive energy assays were conducted. The results are in agreement with some manufacture specifications and the obtained information will be crucial in the analysis of durability and stability of the ceramic tile system installed with this new product. (author)

  16. Developing Headquarters Guidance for Army Installation Sustainability Plans in 2007

    Science.gov (United States)

    2009-01-01

    leverage off strong installation pollution prevention, energy man- agement, environmental management systems (EMSs) (such as ISO 14001 implemen- tation...Plans in 2007 Fort Campbell, “Sustainable Installation Management System ISO 14001 .” Fort Campbell, KY, 15 January 2006. As of October 19, 2006...mis- sion requirements worldwide, safeguards human health, improves quality of life, and enhances the natural environment.” This strategy transitions

  17. Offshore Renewable Energy Installations: Impact on Navigation and Marine Safety

    Science.gov (United States)

    2011-01-01

    To reduce our dependence on foreign energy supplies, alternative or renewable energy sources are being pursued. These sources exploit a wide range of...technologies: solar photovoltaics or power plants; hydroelectricity (dams); ocean thermal energy conversion facilities; and offshore renewable energy installations...to affect marine navigation and safety, and although no offshore renewable energy installations presently exist in U.S. waters, several are

  18. Data - installed capacity of Indian provinces on 31 December 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-16

    Tables from the 2002 fiscal year annual report of India's Ministry of Power list the installed capacity total and by fuel source (hydro, coal, gas, diesel, wind, nuclear) of power plants in each of India's states. Figures are given for each of the ownership sectors - state, private and central. The total installed capacity for India on 31 December 2001 was 103,134.06 MW.

  19. Solution for Improve the Efficiency of Solar Photovoltaic Installation

    Directory of Open Access Journals (Sweden)

    Petru Chioncel

    2013-01-01

    Full Text Available This paper present a solution for improving efficiency of solar photovoltaic installation, realized with fixed solar photovoltaic modules, placed in solar parks or individual installations. The proposed solution to increase the radiation on the solar photovoltaic panels is to use some thin plates covered with a reflective blanket, mounted in front of the solar photovoltaic modules, with the possibility of their adjustment.

  20. Entity Resolution Workflow Installation Process and User Guide

    Science.gov (United States)

    2013-07-01

    PostgreSQL Service on Windows OS. ...............................................................3 Figure 2. Starting Global Graph REST Service on...Otherwise, users can use the pre-configured and pre- installed virtual machines to test the ERW components. Installation Sequence 1. Start PostgreSQL ...Service on ERDP-Win7 (figure 1). • Log in to ERDP-Win7 as the “arl” user/administrator. • Use Windows Services Manager to start the PostgreSQL

  1. Installations for water desalination by reverse osmosis. P. 2

    International Nuclear Information System (INIS)

    Bauermann, H.D.; Ermert, U.

    1974-01-01

    Starting with the explanation of an installation scheme of a reverse osmosis (RO) plant for water desalination, the various parts of such a plant are firstly discussed briefly. After a chapter dealing with the feed pre-treatment required, the operation of RO-plants is dealt with. The usual variations of arrangement are shown, as well as some information given on maintenance and costs of such methods of desalination. The last part contains some examples of plants installed so far. (orig.) [de

  2. Climate Change Impacts at Department of Defense Installations

    Science.gov (United States)

    2017-06-16

    Christensen, N.S., A.W. Wood, N. Voisin, D.P. Lettenmaier, and R.N. Palmer, 2004: The effects of climate change on the hydrology and water resources...ANL/EVS-17/9 Climate Change Impacts at Department of Defense Installations Environmental Science Division About...LLC. June 16, 2017 ANL/EVS-17/9 Climate Change Impacts at Department of Defense Installations prepared by Rao Kotamarthi

  3. Technical aspects of the safety of nuclear installations

    International Nuclear Information System (INIS)

    Bourgeois, J.

    1979-12-01

    Methods employed to carry out the technical assessment of safety are described. The roles of the builder, operator and public authority in relation to the safety of nuclear installations are noted. The safety of a reactor rests on the effectiveness of three or four impermeable barriers which must prevent radioactive products from escaping. In France there are efforts to introduce the ideas of reliability and accident probability into the analysis of the safety of an installation

  4. Decommissioning of nuclear installations - regulations - financing - responsibility - insurance

    International Nuclear Information System (INIS)

    Hubert, E.H.; Andersson, C.; Deprimoz, J.; Mayoux, J.C.; Richard, M.; Sartorelli, C.; Nocera, F.

    1983-01-01

    This paper highlights three aspects of decommissioning of nuclear installations which relate, more or less directly, to legal options already applied or advocated. It reviews the regulatory conditions for decommissioning a nuclear installation and indicates legal provisions for financing decommissioning expenditures. It also describes the legal provisions to determine liabilities in case of nuclear damage and the assistance which insurers may provide to cover the consequences of such liabilities. (NEA) [fr

  5. Installation Test of Cold Neutron Soruce In-pool Assembly

    International Nuclear Information System (INIS)

    Lee, Kye Hong; Choi, J.; Wu, S. I.; Kim, Y. K.; Cho, Y. G.; Lee, C. H.; Kim, K. R.

    2006-04-01

    Before installation of the final cold neutron source in-pool assembly (IPA) in the vertical CN hole at the HANARO, the research reactor, the installation test of IPA has been conducted in the CN hole of the reactor using a full-scaled mock-up in-pool assembly. The well-known cold neutron sources, being safely operated or being now constructed, had been constructed together with each research reactor; therefore, there was little limitation to obtain the optimal cold neutron source since a cold neutron source had been decided to be installed in the reactor from the beginning of the design for the reactor construction. Unlikely, the HANARO has been operated for 10 years so that we have got lots of design limitation in terms of the decisions in the optimal shape, size, minimal light-water gap, and adhesion degree to the CN beam tube, IPA installation tools, etc. for the construction of the CNS. Accordingly, the main objective of this test is to understand any potential problem or interference happened inside the reactor by installing the mock-up IPA and installation bracket. The outcomes from this test is reflected on the finalizing process of the IPA detail design

  6. Evaluation of Installation Time for SMASHmount by SMASHsolar

    Energy Technology Data Exchange (ETDEWEB)

    2017-04-05

    The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewable Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.

  7. Development of a quality management system for Brazilian nuclear installations

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Zouain, Desiree Moraes

    2005-01-01

    The present work is a proposal for developing a quality management system for Brazilian nuclear installations, based on applicable standards. The standard ISO 9001:2000 [4] establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard IAEA 50-C/SG-Q [1] establishes general requirements for the implementation of a quality assurance system in nuclear installations. The standard CNEN-NN- 1.16 [5] establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The revision of standard IAEA 50-C/SG-Q [1], to be replaced by IAEA DS 338 [2] and IAEA DPP 349 [3], introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concept of 'Quality Assurance'. This approach is incorporated with the current tendency, because it guides the system to manage, in an integrated way, the requirements of quality, safety, health, environment, security and economics of the installation. The results of the characterization of the quality management systems established in the applicable standards are presented, with the determination of the common and conflicting points among them. Referring data to quality assurance program/quality management system in some nuclear installations of IAEA Member States are also presented. (author)

  8. Statistical Model Checking for Product Lines

    DEFF Research Database (Denmark)

    ter Beek, Maurice H.; Legay, Axel; Lluch Lafuente, Alberto

    2016-01-01

    We report on the suitability of statistical model checking for the analysis of quantitative properties of product line models by an extended treatment of earlier work by the authors. The type of analysis that can be performed includes the likelihood of specific product behaviour, the expected...... average cost of products (in terms of the attributes of the products’ features) and the probability of features to be (un)installed at runtime. The product lines must be modelled in QFLan, which extends the probabilistic feature-oriented language PFLan with novel quantitative constraints among features...... behaviour converge in a discrete-time Markov chain semantics, enabling the analysis of quantitative properties. Technically, a Maude implementation of QFLan, integrated with Microsoft’s SMT constraint solver Z3, is combined with the distributed statistical model checker MultiVeStA, developed by one...

  9. Installations of SNCR on bark-fired boilers

    International Nuclear Information System (INIS)

    Hjalmarsson, A.K.; Hedin, K.; Andersson, Lars

    1997-01-01

    Experience has been collected from the twelve bark-fired boilers in Sweden with selective non catalytic reduction (SNCR) installations to reduce emissions of nitrogen oxides. Most of the boilers have slope grates, but there are also two boilers with cyclone ovens and two fluidized bed boilers. In addition to oil there are also possibilities to burn other fuel types in most boilers, such as sludge from different parts of the pulp and paper mills, saw dust and wood chips. The SNCR installations seems in general to be of simple design. In most installations the injection nozzles are located in existing holes in the boiler walls. The availability is reported to be good from several of the SNCR installations. There has been tube leakage in several boilers. The urea system has resulted in corrosion and in clogging of one oil burner. This incident has resulted in a decision not to use SNCR system with the present design of the system. The fuel has also caused operational problems with the SNCR system in several of the installations due to variations in the moisture content and often high moisture content in bark and sludge, causing temperature variations. The availability is presented to be high for the SNCR system at several of the plants, in two of them about 90 %. The results in NO x reduction vary between the installations depending on boiler, fuel and operation. The emissions are between 45 and 100 mg NO 2 /MJ fuel input and the NO x reduction rates are in most installations between 30 and 40 %, the lowest 20 and the highest 70 %. 13 figs, 3 tabs

  10. Renewable Energy Opportunities at the Kanto Installations, Japan

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-09-24

    This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most

  11. Analytical techniques for in-line/on-line monitoring of uranium and plutonium in process solutions : a brief literature survey

    International Nuclear Information System (INIS)

    Marathe, S.G.; Sood, D.D.

    1991-01-01

    In-line/on-line monitoring of various parameters such as uranium-plutonium-fission product concentration, acidity, density etc. plays an important role in quickly understanding the efficiency of processes in a reprocessing plant. Efforts in studying and installation of such analytical instruments are going on since more than three decades with adaptation of newer methods and technologies. A review on the developement of in-line analytical instrumentation was carried out in this laboratory about two decades ago. This report presents a very short literature survey of the work in the last two decades. The report includes an outline of principles of the main techniques employed in the in-line/on-line monitoring. (author). 77 refs., 6 tabs

  12. The Management System for Nuclear Installations (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  13. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  14. Financing of Liabilities Beyond the Service Life of Nuclear Installations

    Directory of Open Access Journals (Sweden)

    L. Havlíček

    2006-01-01

    Full Text Available Operation of a nuclear installation is connected with the creation of long-term liabilities for spent fuel management and disposal, and also decommissioning of the installation (power plant, storages. This means that the operator will have to expend considerable amount of financial resources over a long period after the closure of installation. These financial resources will have to be created during operation of the installation. Related costs to be expended in future must be fully included in the price of electricity, in order to ensure fair competition among different operators. Financial resources for future coverage of liabilities must be continuously invested in order to compensate for inflation and to gain some real interest.Any failure by the operator to comply with its liabilities poses an economic and potentially an environmental hazard for operator’s country. Due attention must therefore be paid to assessing connected costs, defining liabilities and ensuring appropriate regulatory oversight. Appropriate measures must be well defined and firmly anchored in the legislation of countries operating nuclear installations. This paper reviews the basic principles that should ensure operator’s compliance their liabilities, and maps the current situation in the Czech Republic. 

  15. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  16. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  17. Covariant electromagnetic field lines

    Science.gov (United States)

    Hadad, Y.; Cohen, E.; Kaminer, I.; Elitzur, A. C.

    2017-08-01

    Faraday introduced electric field lines as a powerful tool for understanding the electric force, and these field lines are still used today in classrooms and textbooks teaching the basics of electromagnetism within the electrostatic limit. However, despite attempts at generalizing this concept beyond the electrostatic limit, such a fully relativistic field line theory still appears to be missing. In this work, we propose such a theory and define covariant electromagnetic field lines that naturally extend electric field lines to relativistic systems and general electromagnetic fields. We derive a closed-form formula for the field lines curvature in the vicinity of a charge, and show that it is related to the world line of the charge. This demonstrates how the kinematics of a charge can be derived from the geometry of the electromagnetic field lines. Such a theory may also provide new tools in modeling and analyzing electromagnetic phenomena, and may entail new insights regarding long-standing problems such as radiation-reaction and self-force. In particular, the electromagnetic field lines curvature has the attractive property of being non-singular everywhere, thus eliminating all self-field singularities without using renormalization techniques.

  18. Federal Emergency Management Information System (FEMIS) Installation Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Downing, Timothy R.(BATTELLE (PACIFIC NW LAB)); Dunkle, Julie R.(BATTELLE (PACIFIC NW LAB)); Homer, Brian J.(BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS Installation Guide provides instructions for installing and configuring the FEMIS software package.

  19. Wind power installations in Switzerland - Regional planning basics and impact

    International Nuclear Information System (INIS)

    Ott, W.; Kaufmann, Y.; Steiner, P.; Gilgen, K.; Sartoris, A.

    2008-01-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  20. Nuclear installations safety in France. Compilation of regulatory guides

    International Nuclear Information System (INIS)

    1988-01-01

    General plan: 1. General organization of public officials. Procedures 1.1. Texts defining the general organization and the procedures 1.2. Interventing organisms; 2. Texts presenting a technical aspect other than basic safety rules and associated organization texts; 2.1. Dispositions relating to safety of nuclear installations 2.2. Dispositions relating to pressure vessels 2.3. Dispositions relating to quality 2.4. Dispositions relating to radioactive wastes release 2.5. Dispositions relating to activities depending of classified installations; 3. Basic Safety Rules (BSR) 3.1. BSR relating to PWR 3.2. BSR relating to nuclear installations other than PWR 3.3. Other BSR [fr

  1. Ground mounted photovoltaic installations. Guide for an impact study

    International Nuclear Information System (INIS)

    2011-01-01

    Legally, an impact study must be performed for ground mounted photovoltaic installations with a power greater than 250 kW. This guide is aimed at helping the actors of the photovoltaic sector to perform impact studies. After the description of the characteristics of a photovoltaic installation (principles, technical characteristics of a ground mounted installation, impact of photovoltaic systems on climate) and a presentation of the legal framework (European commitments, Grenelle de l'Environnement, applicable procedures), this report present the objectives and approach of an impact study, describes how the environment is taken into account from the early stages of a project, how the impact study is to be prepared. The last part describes the different components of the impact study: legal content, project description, analysis of the site initial status and environment, analysis of the project effects, rationale for the choice of the project

  2. Practical methods for radiation survey in nuclear installations

    International Nuclear Information System (INIS)

    Shweikani, R.

    2001-12-01

    This study is placed to those who are responsible to perform radiation survey in the nuclear installations, especially the beginners. Therefore, it gives a comprehensive view to all-important aspects related to their work starting from the structure of atoms to the practical steps for radiation survey works. So, it clarify how to perform personal monitoring, methods for monitoring surface contamination, methods for measuring radioactivity of gases and radioactive aerosols in air, monitoring radiation doses, measuring radiation influences in workplaces and finally measuring internal exposure of radiation workers in nuclear installations. Finally, The study shows some cases of breaches of radiation protection rules in some American nuclear installations and describes the final results of these breaches. The aim of this is to assure that any breach or ignore to radiation protection principles may produce bad results, and there is no leniency in implementing environmental radiation protection principles. (author)

  3. Designing, Integrating, and Coordinating the Installation of MedAustron

    CERN Document Server

    Nicquevert, B; Benedikt, M

    2011-01-01

    "Give me a layout good enough and a building to place it, and I will install your accelerator". To paraphrase Archimedes, this is the role attributed to the Integration team in the MedAustron project. Starting with the optics layout and a building sketch, the integration work consists of a series of activities, interlinked in a complex manner. First the design and the integration of accelerator: list all items, define geometrical envelopes with interfaces, put them in position in CAD, identify conflicts and define input for design of items and of infrastructure. Then the various equipment is procured: verify and validate design data, follow-up manufacturing, fiducialize equipment and build supports. Lastly the global installation: check building and infrastructure, define survey framework, install and pre-align equipment on supports, move assemblies to their final location, survey actual position and adjust to theoretical position. The whole chain of operations from the layout to a real beam in MedAustron, i...

  4. Mineral insulated thermocouples - installation in steam generating plant

    International Nuclear Information System (INIS)

    Bridges, W.J.; Brown, J.F.

    1980-01-01

    The main areas of interest considered are Central Station Fossil Fuel fired boilers of around 500 MW capacity, AGR Boilers, and Industrial and Research Development projects. While the requirement for temperature measurement in each of these areas may vary the techniques adopted to overcome installation and protection problems created by thermal, chemical and mechanical hazards remain basically the same. The reasons for temperature measurement are described together with methods of attachment development and procedures for protection of the thermocouple along its route length until its exit from the hazardous environment. These relative accuracies of the different attachments are discussed along with factors influencing the life of the thermocouple. In many instances thermocouple installation is either a once only opportunity and/or an expensive exercise. It is therefore essential to develop and apply an effective quality control system during the installation phase. An effective system is described. Finally, a brief outline of possible future trends is given. (author)

  5. Safety requirements and radiological protection for ore installations

    International Nuclear Information System (INIS)

    2003-06-01

    This norm establishes the safety and radiological protection requirements for mining installations which manipulates, process and storing ores, raw materials, steriles, slags and wastes containing radionuclides of the uranium and thorium natural series, simultaneously or separated, and which can cause undue exposures to the public and workers, at anytime of the functioning or pos operational stage. This norm applies to the mining installations activities, suspended or which have ceased their activities before the issue date of this norm, destined to the mining, physical, chemical and metallurgical processing, and the industrialization of raw materials and residues containing associated radionuclides from the natural series of uranium and thorium, including the stages of implantation, operation and decommissioning of the installation

  6. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Eoliennes en Suisse. Liste de controle pour investisseurs de grandes installations

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  7. Glue-paste linings

    DEFF Research Database (Denmark)

    Fuster-López, Laura; Andersen, Cecil Krarup; Bouillon, Nicolas

    2017-01-01

    processes of lined canvas paintings. The impact of cyclic relative humidity on the biological and physical stability of the laminate structure is reported. Carefully constructed mock-ups, simulating lined canvas paintings, were used to examine the effect of pest infestation, mould growth, mechanical damage...

  8. Minnesota County Boundaries - lines

    Data.gov (United States)

    Minnesota Department of Natural Resources — Minnesota county boundaries derived from a combination of 1:24,000 scale PLS lines, 1:100,000 scale TIGER, 1:100,000 scale DLG, and 1:24,000 scale hydrography lines....

  9. Managing a major security system installation: Practical lessons learned

    International Nuclear Information System (INIS)

    Roehrig, S.C.

    1986-01-01

    Sandia National Laboratories has been heavily involved for over a decade in aiding a number of DOE facilities in defining and implementing upgraded security safeguards systems. Because security system definition, design, and installation is still a relatively new field to the commercial world, effective project management must pay special attention to first understanding and then interpreting the unique aspects of a security system for all concerned parties. Experiences from an actual security system installation are used to illustrate some project management approaches which have been found to be effective

  10. Status and perspectives of wind turbine installations in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Barra, L.; Arena, A.; Mizzoni, G.; Pirazzi, L. [ENEA, Rome (Italy). Energy Dept.

    1995-12-31

    The article intends to illustrate the Italian situation in wind sector, giving some elements to explain why some delay is registered with respect to other European countries. Further than the present day situation, from which it can be concluded that the diffusion process is still commencing, being installed only 20 MW, the perspectives are discussed. Projects for plant installations totaling about 430 MW have been submitted to the electric utility. The actual realization of these important initiatives will probably depend on the ability to use wind energy as an occasion to sustain economic development of the involved zones. (author)

  11. The Installation Status of the SNS Accumulator Ring

    CERN Document Server

    Hechler, Michael; Error, Joseph; McGahern, William J

    2005-01-01

    The Spallation Neutron Source (SNS*) SNS accumulator Ring, when completed in 2006, will be capable of delivering a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron production. This paper presents an overview of the issues and logistics associated with the preparation and installation of the accumulator Ring. The preparatory activities which occurred at the Brookhaven National Laboratory, vendors and at the SNS will be discussed as well as the installation sequence and procedures.

  12. Photovoltaics for professionals solar electric systems marketing, design and installation

    CERN Document Server

    Falk, Antony; Remmers, Karl-Heinz

    2007-01-01

    For the building industry, the installation of photovoltaic systems has become a new field of activity. Interest in solar energy is growing and future business prospects are excellent. Photovoltaics for Professionals describes the practicalities of marketing, designing and installing photovoltaic systems, both grid-tied and stand-alone. It has been written for electricians, technicians, builders, architects and building engineers who want to get involved in this expanding industry. It answers all the beginner's questions as well as serving as a textbook and work of reference

  13. Solar system installation at Louisville, Kentucky (final report)

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-07

    A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

  14. Status and perspectives of wind turbine installations in Italy

    International Nuclear Information System (INIS)

    Barra, L.; Arena, A.; Mizzoni, G.; Pirazzi, L.

    1995-01-01

    The article intends to illustrate the Italian situation in wind sector, giving some elements to explain why some delay is registered with respect to other European countries. Further than the present day situation, from which it can be concluded that the diffusion process is still commencing, being installed only 20 MW, the perspectives are discussed. Projects for plant installations totaling about 430 MW have been submitted to the electric utility. The actual realization of these important initiatives will probably depend on the ability to use wind energy as an occasion to sustain economic development of the involved zones. (author)

  15. Conventional radiology. Mobile installations in medical environment: radiographies in bed

    International Nuclear Information System (INIS)

    2011-01-01

    This document presents the different procedures, the different types of specific hazards, the analysis of risks, their assessment and the preventive methods with regard to radioprotection in the case of mobile installations used in a medical environment to perform radiographies on patients lying on a bed. It indicates and describes the concerned personnel, the course of procedures, the hazards, the identification of the risk associated with ionizing radiation, the risk assessment and the determination of exposure levels, the strategy aimed at controlling the risk (risk reduction, technical measures concerning the installation or the personnel, teaching and information, prevention, incident), the different measures of medical monitoring, the assessment of risk control, and other risks

  16. Eliciting Audience's Experience to Improve Interactive Art Installation

    DEFF Research Database (Denmark)

    Baharin, Hanif; Morrison, Ann

    2006-01-01

    Designing with the users in mind is one of the widely accepted design practices in the Interaction Design field. On the other hand, it can be said that audience's experience is the heart of an interactive art. Since Interaction Design has shown that user's involvement in the design process can be...... installation using techniques adopted from Interaction Design such as prototyping, observation and contextual interview is described. This paper also presents the result from the contextual interview and the improvement made to the installation....

  17. Safety culture in nuclear installations - The role of the regulator

    International Nuclear Information System (INIS)

    Karigi, Alice W.

    2002-01-01

    Safety culture is an amalgamation of values, standards, morals and norms of acceptable behavior by the licensees, Radiation workers and the Regulator. The role played by a Regulator in establishing safety culture in a nuclear installation is that related to Authorization, review, assessment, inspection and enforcement. The regulator is to follow the development of a facility or activity from initial selection of the site through design, construction, commissioning, radioactive waste management through to decommissioning and closure. He is to ensure safety measures are followed through out the operation of the facility by laying down in the license conditions of controlling construction of nuclear installations and ensuring competence of the operators. (author)

  18. Thermal solar energy. Collective domestic hot water installations

    International Nuclear Information System (INIS)

    Garnier, Cedric; Chauvet, Chrystele; Fourrier, Pascal

    2016-01-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic outlook on the way to complete the installation of a collective domestic water solar heating system. After some recall of what is solar energy, the thermal solar technology and the energy savings it may induce, this document presents the main hydraulic configurations of a solar heating system with water storage, the dimensioning of a solar water heating system and its cost estimation, the installation and the commissioning of the system, the monitoring and maintenance operations

  19. Installation af vaskemaskine og tørretumbler

    DEFF Research Database (Denmark)

    Christiansen, J.; Skibstrup Eriksen, S.; Nielsen, F.

    Denne SBI-anvisning er et led i en serie om modernisering af installationerne i den ældre boligmasse. Den henvender sig til både beboere, husejere, VVS-installatører og andre interesserede. Anvisningen indeholder almene afsnit om valg og placering af vaskemaskine og tørretumbler, sagsforløb ved i...... installation, forhold til myndigheder, priser, finansieringsuligheder m.m. Anvisningen indeholder endvidere tekniske afsnit om vandinstallation, afløb, ventilation og elinstallation i forbindelse med installation af vaskemaskine og tørretumbler....

  20. Manufacture and installation of JET MKII divertor support structure

    International Nuclear Information System (INIS)

    Celentano, G.; Altmann, H.; Macklin, B.; Miele, P.; Pick, M.A.; Tait, J.; Moletta, L.; Romagnolo, A.; Shaw, R.

    1995-01-01

    The water cooled support structure, comprising twenty-four modules is the main component of the JET MKII divertor system. It is to be installed in the vacuum vessel with high accuracy with respect to the magnetic center and the other in-vessel components. The paper describes the design and manufacturing cycle including the required tolerances, the assembly and installation method and the material production process required to ensure the accuracy and reliability of the MKII support structure system. The water cooling holes, machined into the support structure require the procurement of special material to prevent risks of leaks inside the vacuum vessel

  1. Seismic risks in designing the basic nuclear installations

    International Nuclear Information System (INIS)

    Berge-Thierry, C.; Duval, C.

    2004-01-01

    The good behaviour of an installation against an earthquake depends on the risk level of seism and robustness of its structure, equipment and systems. The regulations related to the determination of seismic risk in the nuclear installations have been developed recently taking into account the experience results of great earthquake as well as scientific progress in the two last decades. This article presents the principal evolutions of the rule (RFS2001-01) and recalls the global gait of the determination of hazards in a site. (author)

  2. Seismic detection system for blocking the dangerous installations in case of strong earthquake occurrence

    Science.gov (United States)

    Ghica, Daniela; Corneliu Rau, Dan; Ionescu, Constantin; Grigore, Adrian

    2010-05-01

    During the last 70 years, four major earthquakes occurred in the Vrancea seismic area affected Romania territory: 10 November 1940 (Mw = 7.7, 160 km depth), 4 March 1977 (Mw = 7.5, 100 km depth), 30 August 1986 (Mw = 7.2, 140 km depth), 30 May 30 1990 (Mw = 6.9, 80 km depth). Romania is a European country with significant seismicity. So far, the 1977 event had the most catastrophic consequences: about 33,000 residences were totally destroyed or partially deteriorated, 1,571 people dies and another 11,300 were injured. Moreover, 61 natural-gas pipelines were damaged, causing destructive fires. The total losses were estimated at 3 mld. U.S. dollars. Recent studies clearly pointed out that in case of a strong earthquake occurrence in Vrancea region (Ms above 7), the biggest danger regarding the major cities comes from explosions and fires started immediately after the earthquake, and the most important factor of risk are the natural gas distribution networks. The damages are strongly amplified by the fact that, simultaneously, water and electric energy lines distributions are damaged too, making impossible the efficient firemen intervention, for localizing the fire sources. Presently, in Romania safe and efficient accepted solutions for improving the buildings securing, using antiseismic protection of the dangerous installations as natural-gas pipelines are not available. Therefore, we propose a seismic detection system based on a seismically actuated gas shut-off valve, which is automatically shut down in case of a seismic shock. The device is intended to be installed in the natural-gas supply line outside of buildings, as well at each user (group of users), inside of the buildings. The seismic detection system for blocking the dangerous installations in case of a strong earthquake occurrence was designed on the basis of 12 criteria enforced by the US regulations for seismic valves, aimed to eliminate the critical situations as fluids and under pressure gases leakage

  3. Protection of civilian nuclear installations in time of armed conflict

    International Nuclear Information System (INIS)

    Lamm, V.

    2003-01-01

    The inclusion of article 56 in Protocol 1 of the Geneva convention of 12 August 1949 represents a significant achievement in the development of international humanitarian law. Article 56 of protocol 1 reads as follow: firstly, works or installations containing dangerous forces, namely dams, dykes and nuclear electrical generating stations, shall not not be made the object of attack, even where these objects are military objectives, if such attack may cause the release of dangerous forces and consequent severe losses among the civilian population. Other military objectives located at or in the vicinity of these works or installations shall not be made the object of attack if such attack may cause the release of dangerous forces from the works or installations and consequent severe losses among the civilian population. Secondly, the special protection against attack provided by paragraph 1 shall cease: for a dam or a dyke only if it is used for other than its normal function and in regular, significant and direct support of military operations and if such attack is the only feasible way to terminate such support; for a nuclear electrical generating station only if it provides electric power in regular, significant and direct support of military operations and if such attack is the only feasible way to terminate such support;for other military objectives located at or in the vicinity of these works or installations only if they are used in regular, significant and direct support of military operations and if such attack is the only feasible way to terminate such support. Thirdly, in all cases, the civilian population and individual civilians shall remain entitled to all the protection accorded them by international law, including the protection of the precautionary measures provided for in article 57. If the protection ceases and any of the works, installations or military objectives mentioned in paragraph 1 is attacked, all practical precautions shall be taken to

  4. Estimation of the Frequency of Instantaneous Voltage Drops Dependent on Arrangement of Line Surge Arresters

    Science.gov (United States)

    Kawamura, Hironao; Kozuka, Masahiro; Itamoto, Naoki; Shinjo, Kazuo; Ishii, Masaru

    Lightning faults on transmission lines often cause instantaneous voltage drops in power systems. Influences of instantaneous voltage drops become increasingly serious in high technology industries etc. As countermeasures of instantaneous voltage drops, uninterruptible power supplies (UPS) are employed. On the other hand, line surge arresters are installed on transmission lines increasingly as one of the effective countermeasures of double-circuit faults caused by lightning strokes. Additionally, the arresters are effective as one of the reduction methods for the frequency of instantaneous voltage drops. In this paper, the frequency of instantaneous voltage drops reduced by installation of line surge arresters on transmission lines is estimated by employing EMTP analysis. Also, the accuracy of the method in estimating the frequency of instantaneous voltage drops in power systems is evaluated through comparison with experience.

  5. Preliminary design for spent fuel canister handling systems in a canister transfer and installation vehicle

    International Nuclear Information System (INIS)

    Wendelin, T.; Suikki, M.

    2008-12-01

    The report presents a spent fuel canister transfer and installation vehicle. The vehicle is used for carrying the fuel canister into a disposal tunnel and installing it into a deposition hole. The report outlines basic requirements and a design for canister handling equipment used in a canister transfer and installation vehicle, a description regarding the operation and maintenance of the equipment, as well as a cost estimate. Specific vehicles will be manufactured for all canister types in order to minimize the height of the disposal tunnels. This report is only focused on a transfer and installation vehicle for OL1-2 fuel canisters. Detailed designing and selection of final components have not yet been carried out. The report also describes the vehicle's requirements for the structures of a repository system, as well as actions in possible malfunction or fault situations. The spent fuel canister is brought from an encapsulation plant by a canister lift down to the repository level. The fuel canister is driven from the canister lift by an automated guided vehicle onto a canister hoist at a canister loading station. The canister transfer and installation vehicle is waiting for the canister with its radiation shield in an upright position above the canister hoist. The hoist carries the canister upward until the vehicle's own lifting means grab hold of the canister and raise it up into the vehicle's radiation shield. This is followed by turning the radiation shield to a transport position and by closing it in a radiation-proof manner against a rear radiation shield. The vehicle is driven along the central tunnel into the disposal tunnel and parked on top of the deposition hole. The vehicle's radiation shield is turned to the upright position and the canister is lowered with the vehicle's hydraulic winches into a bentonite-lined deposition hole. The radiation shield is turned back to the transport position and the vehicle can be driven out of the disposal tunnel

  6. Evaluation of Instrumentation and Dynamic Thermal Ratings for Overhead Lines

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, A. [New York Power Authority, White Plains, NY (United States)

    2013-01-31

    In 2010, a project was initiated through a partnership between the Department of Energy (DOE) and the New York Power Authority (NYPA) to evaluate EPRI's rating technology and instrumentation that can be used to monitor the thermal states of transmission lines and provide the required real-time data for real-time rating calculations. The project included the installation and maintenance of various instruments at three 230 kV line sites in northern New York. The instruments were monitored, and data collection and rating calculations were performed for about a three year period.

  7. Geometry and Optics of the Electrostatic ELENA Transfer Lines

    CERN Document Server

    Vanbavinckhove, G; Barna, D; Bartmann, W; Butin, F; Choisnet, O; Yamada, H

    2013-01-01

    The future ELENA ring at CERN will decelerate the AD anti-proton beam further from 5.3 MeV to 100 keV kinetic energy, to increase the efficiency of anti-proton trapping. At present there are four experiments in the AD hall which will be complemented with the installation of ELENA by additional three experiments and an additional source for commissioning. This paper describes the optimization of the transfer line geometry, ring rotation and source position. The optics of the transfer lines and error studies to define field and alignment tolerances are shown, and the optics particularities of electrostatic elements and their optimization highlighted.

  8. End of the line to build a circle

    CERN Multimedia

    2006-01-01

    The installation of the cryogenic distribution line in the LHC tunnel is finally finished! All the sectors have undergone pressure and helium leak tests at room temperature, and one complete sector was cold tested in cryogenic conditions. Some of the QRL team in UJ22 of the LHC tunnel, where the last sector of the cryogenic distribution line was installed.It must have been a joyous moment in UJ22 of the LHC tunnel (near Point 2, Saint Genis Pouilly) on 19 October. This was where the last external weld of the cryogenic distribution line, also known as QRL, was made, thus completing the full distribution ring. The QRL is a circle built in 8 sectors, each approximately 3 km in length. It will circulate helium in liquid and gas phases, at different temperatures and pressures, to provide the cryogenic conditions for the superconducting magnets in the LHC tunnel. The last sector installed (sector 1-2) passed the pressure and helium leak tests at room temperature on 28 October. As part of the warm test, each sector...

  9. Effect of distributed generation installation on power loss using genetic algorithm method

    Science.gov (United States)

    Hasibuan, A.; Masri, S.; Othman, W. A. F. W. B.

    2018-02-01

    Injection of the generator distributed in the distribution network can affect the power system significantly. The effect that occurs depends on the allocation of DG on each part of the distribution network. Implementation of this approach has been made to the IEEE 30 bus standard and shows the optimum location and size of the DG which shows a decrease in power losses in the system. This paper aims to show the impact of distributed generation on the distribution system losses. The main purpose of installing DG on a distribution system is to reduce power losses on the power system.Some problems in power systems that can be solved with the installation of DG, one of which will be explored in the use of DG in this study is to reduce the power loss in the transmission line. Simulation results from case studies on the IEEE 30 bus standard system show that the system power loss decreased from 5.7781 MW to 1,5757 MW or just 27,27%. The simulated DG is injected to the bus with the lowest voltage drop on the bus number 8.

  10. Precision-guided vehicle for transport and installation of LHC cryomagnets

    CERN Document Server

    Maximilien Brice

    2003-01-01

    LHC quadrupoles and dipoles are heavier, longer and more fragile than the magnets used in CERN s former LEP collider. Therefore, an innovative solution for their transport and installation in the tunnel has been developed. It consists of convoys of two tractors, a trailer and unloading equipment. The convoys feature infrared optical guidance, which offsets the minimal clearance inside the tunnel, and are designed to minimize vibration of the magnets during transport. Operations will be monitored by a technician, who will take over the controls to unload and install the magnets. The first such convoy is now undergoing testing in the tunnel. The people who have contributed to the new transport system are pictured here at Point 4 in the LHC tunnel where tests on the first convoy are being conducted. The optical guidance system uses the white lines on the floor (Photos 01 and 03) to steer the vehicle in the tunnel. The prototype quadrupole magnet used in the tests is visible in Photos 02 and 04.

  11. Specific Aspects Regarding Coupled Numerical Modeling of Inverter and Load Equipments in an Induction Heating Installation

    Directory of Open Access Journals (Sweden)

    Claudiu MICH-VANCEA

    2008-05-01

    Full Text Available The most propitious projection of inductiveelectrothermic installation requires a deep study ofcoupled electrothermic and circuits problems; thereforethe present paper follows the same line. Research inspecific literature have emphasized that induction heatinghas a much higher efficiency if the supply of the charge(inductor – piece is done at frequencies other thatindustrial one. [1]. Due to material alter depending ontemperature and, implicitly, the variation of the electricalparameters of the heating installation it is necessary totackle the projection of these inductive electrothermicinstallation projected through coupled numericalmodeling of the inverter circuit and of the heatingthrough induction process. The paper presents thenumerical modeling of the continuous current –alternating current conversion bridge (inverter withelements of static switch – over, the type of commandsignal (PWM of elements of static switch of power, thenumerical modeling of the heating throughelectromagnetic induction process and aspects ofcorrelation regarding the functioning/ working of theinstallation depending on the parameters of the load. Theparameters get modified due to material alter dependingon temperature during the heating process.

  12. Design and installation of a Prototype Geohazard Monitoring System near Machu Picchu, Peru

    Science.gov (United States)

    Bulmer, M. H.; Farquhar, T.

    2010-09-01

    The town of Machu Picchu, Peru, serves the >700 000 tourists visiting Machu Picchu annually. It has grown threefold in population in the past two decades. Due to the limited low-lying ground, construction is occurring on the unstable valley slopes. Slopes range from 70° in the surrounding mountains. The town has grown on a delta formed at the confluence of the Alcamayo, Aguas Calientes and Vilcanota Rivers. Geohazards in and around the town of particular concern are 1) large rocks falling onto the town and/or the rail line, 2) flash flooding by any one of its three rivers, and 3) mudflows and landslides. A prototype early warning system that could monitor weather, river flow and slope stability was installed along the Aguas Calientes River in 2009. This has a distributed modular construction allowing components to be installed, maintained, salvaged, and repaired by local technicians. A diverse set of candidate power, communication and sensor technologies was evaluated. Most of the technologies had never been deployed in similar terrain, altitude or weather. The successful deployment of the prototype proved that it is technically feasible to develop early warning capacity in the town.

  13. Awareness of the Installation the Lightning Protection System (LPS by Using Structural Bonding Method in Malaysia

    Directory of Open Access Journals (Sweden)

    Abdul Rahim Mustaqqim

    2017-01-01

    Full Text Available Structural Bonding Method (SBM is one type of Lightning Protection System (LPS, design to protect human, structures, contents inside structures, electrical equipment, transmission lines and other from the lightning flash. Besides, SBM is a standard LPS that comply with technical standards or codes of practice or called as conventional Lightning Protection System. In order to know the level of the Awareness of the Installation LPS by using SBM in the building among Civil Engineering Consultants, conducting survey need to be done. This paper presents the Research Design and Research Strategy in conducting the survey. It is explaining about the way before conducting the survey which are determine the population of sample (Consultant Company at Northern Region Area, samples of respondents (Civil Engineer at Consultant Office with the number of sample is 40, data collecting process, structure of the questionnaire form and the way in analysis the data. After the analysis the data, the result of the level of awareness in the Installation of LPS by using SBM are consider as moderate level.

  14. Design and installation of a next generation pilot scale fermentation system.

    Science.gov (United States)

    Junker, B; Brix, T; Lester, M; Kardos, P; Adamca, J; Lynch, J; Schmitt, J; Salmon, P

    2003-01-01

    Four new fermenters were designed and constructed for use in secondary metabolite cultivations, bioconversions, and enzyme production. A new PC/PLC-based control system also was implemented using GE Fanuc PLCs, Genius I/O blocks, and Fix Dynamics SCADA software. These systems were incorporated into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Details of the design of these new fermenters and the new control system are described and compared with the existing installation for expected effectiveness. In addition, the reasoning behind selection of some of these features has been included. Key to the design was the goal of preserving similarity between the new and previously existing and successfully utilized fermenter hardware and software installations where feasible but implementing improvements where warranted and beneficial. Examples of enhancements include strategic use of Inconel as a material of construction to reduce corrosion, piping layout design for simplified hazardous energy isolation, on-line calculation and control of nutrient feed rates, and the use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation.

  15. Design and installation of a Prototype Geohazard Monitoring System near Machu Picchu, Peru

    Directory of Open Access Journals (Sweden)

    M. H. Bulmer

    2010-09-01

    Full Text Available The town of Machu Picchu, Peru, serves the >700 000 tourists visiting Machu Picchu annually. It has grown threefold in population in the past two decades. Due to the limited low-lying ground, construction is occurring on the unstable valley slopes. Slopes range from <10° on the valley floor to >70° in the surrounding mountains. The town has grown on a delta formed at the confluence of the Alcamayo, Aguas Calientes and Vilcanota Rivers. Geohazards in and around the town of particular concern are 1 large rocks falling onto the town and/or the rail line, 2 flash flooding by any one of its three rivers, and 3 mudflows and landslides. A prototype early warning system that could monitor weather, river flow and slope stability was installed along the Aguas Calientes River in 2009. This has a distributed modular construction allowing components to be installed, maintained, salvaged, and repaired by local technicians. A diverse set of candidate power, communication and sensor technologies was evaluated. Most of the technologies had never been deployed in similar terrain, altitude or weather. The successful deployment of the prototype proved that it is technically feasible to develop early warning capacity in the town.

  16. The CHAIN-Project and Installation of Flare Monitoring Telescopes in Developing Countries

    Directory of Open Access Journals (Sweden)

    S UeNo

    2009-04-01

    Full Text Available The Flare Monitoring Telescope (FMT was constructed in 1992 at Hida Observatory in Japan to investigate the long-term variation of solar activity and explosive events. It has five solar imaging telescopes that simultaneously observe the full-disk Sun at different wavelengths around the H-alpha absorption line or in different modes. Therefore, the FMT can measure the three-dimensional velocity field of moving structures on the full solar disk. The science target of the FMT is to monitor solar flares and erupting filaments continuously all over the solar disk and to investigate correlation between the characteristics of the erupting phenomena and the geoeffectiveness of the corresponding coronal mass ejections (CMEs. We are planning to start up a new worldwide project, the Continuous H-alpha Imaging Network (CHAIN project, as an important IHY project of our observatories. As part of this project, we are examining the possibility of installing telescopes similar to the FMT in developing countries. We have selected Peru and Algeria as the countries where the first and second overseas FMTs will be installed, and we are aiming to start operation of these FMTs by the end of 2010 before the maximum phase of solar cycle 24. To create such an international network, it will be necessary to improve the information technologies applied in our observation-system. In this paper, we explain the current status and future areas of work regarding our system.

  17. Guide related to structure sanitation in basic nuclear installations. Guide Nr 14, Release of the 30 August 2016

    International Nuclear Information System (INIS)

    2016-01-01

    This guide defines recommendations made by the ASN regarding the sanitation methodology to be applied to buildings and structures of any basic nuclear installation. After a recall of the general doctrine for the management of wastes in basic nuclear installations, the guide presents the ASN doctrine for structure sanitation which distinguishes complete sanitation, extended sanitation, and sanitation in operation phase. It presents principles for the sanitation of component structures of an area of possible production of nuclear wastes. It indicates administrative procedures to be applied before and after sanitation works, notably when the radiological condition of structures has been made compatible or not with any use. After indication of requirements in terms of quality insurance, modalities of definition of defence lines (from first to fourth) are discussed. Requirements regarding the performance of sanitation operations are reviewed

  18. Cell line provenance.

    Science.gov (United States)

    Freshney, R Ian

    2002-07-01

    Cultured cell lines have become an extremely valuable resource, both in academic research and in industrial biotechnology. However, their value is frequently compromised by misidentification and undetected microbial contamination. As detailed elsewhere in this volume, the technology, both simple and sophisticated, is available to remedy the problems of misidentification and contamination, given the will to apply it. Combined with proper records of the origin and history of the cell line, assays for authentication and contamination contribute to the provenance of the cell line. Detailed records should start from the initiation or receipt of the cell line, and should incorporate data on the donor as well as the tissue from which the cell line was derived, should continue with details of maintenance, and include any accidental as well as deliberate deviations from normal maintenance. Records should also contain details of authentication and regular checks for contamination. With this information, preferably stored in a database, and suitable backed up, the provenance of the cell line so created makes the cell line a much more valuable resource, fit for validation in industrial applications and more likely to provide reproducible experimental results when disseminated for research in other laboratories.

  19. Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to the book “Guidelines for Building a Private Cloud Infrastructure”. This document provides guidance on how to install Ubuntu Enterprise Cloud in virtual environment, and afterwards how to scale out when needed. The purpose of this supplemental bo...

  20. A Monet Garden Installation: A Momentary Gift of Art.

    Science.gov (United States)

    McGonigle, Kathleen

    2002-01-01

    Discusses art lessons where students created a three-dimensional rendering of Claude Monet's gardens using the Impressionist style. Focused on teaching students about art history, Impressionistic art, and installation of art. Addresses the goals of the lesson and the process of creating the art. (CMK)

  1. Art at large: through performance and installation art

    NARCIS (Netherlands)

    van Mechelen, M.

    2013-01-01

    A collection of essays previously published in various international journals by art historian Marga van Mechelen, recognised for her expertise in the fields of conceptual, performance and video and installation art, this unusual book was handwritten by graphic designer Ilke Gers. This action in

  2. Assessment approaches to logistics for offshore wind energy installation

    NARCIS (Netherlands)

    Vis, Iris F.A.; Ursavas, Evrim

    2016-01-01

    Offshore wind farm installation planning is highly complex, due to the high dependency on weather and the oversized components that impose specific constraints in areas such as transportation and lifting. Currently, there is very little transparency vis-à-vis the logistics challenges in the

  3. Technical and legal aspects of the decommissioning of nuclear installations

    International Nuclear Information System (INIS)

    Rowden, M.A.; Fowler, S.E.

    1983-01-01

    Many of the plants licensed at the start of nuclear power programmes will require decommissioning in the 1990's and this issue should now be confronted by the nuclear industry, its regulators and governments. This paper deals with the United States programme and experience in the decommissioning of nuclear installations and describes alternative decommissioning methods including safety and financial aspects. (NEA) [fr

  4. 46 CFR 111.15-5 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery... must be as close as possible to the engine or engines. (c) Small batteries. Small size battery... and, for a lead-acid battery, the fully charged specific gravity value. This information must be...

  5. Transformation of Installation Management: An Analysis of Organizational Change

    Science.gov (United States)

    2006-03-15

    This paper analyzes the dynamics of organizational change that led the Department of the Army (DA) to establish the Installation Management Agency...to establish the IMA. Viewed through the lenses of contingency and organizational theory this paper provides answers related to organizational change that are relevant to today’s strategic leaders.

  6. Installation and Assembly, Electrical Ground Support Equipment (GSE), Specification for

    Science.gov (United States)

    Denson, Erik C.

    2014-01-01

    This specification covers the general workmanship requirements and procedures for the complete installation and assembly of electrical ground support equipment (EGSE) such as terminal distributors, junction boxes, conduit and fittings, cable trays and accessories, interconnecting cables (including routing requirements), motor-control equipment, and necessary hardware as specified by the applicable contract and drawings.

  7. Prevention and risks limitation of the radioactive installations

    International Nuclear Information System (INIS)

    San Segundo, T.

    1983-01-01

    Associated risks to the ionizing radiation, in general, and to the radioactive installations, in particular, are exposed; as well as the prevention and limitation techniques applied in order to keep risk into acceptable levels are detatched. Finally, the effect in the human life of the radioactivity use and other activities are compared and man-made occupational and public exposures are explained. (author)

  8. Behavior of Acacia Plants Installed on Substrates Based on ...

    African Journals Online (AJOL)

    The present study aims principally the evaluation of germination and of plant growth of Acacia cyanophylla installed, on the one hand, on the gross forestry compost (CSB) in its purest form, produced in a forest nursery in Tunisia, on the other hand, on the CSB mixed with poultry methacompost (MCA) refined (solid residue ...

  9. Contamination of Ground Water Samples from Well Installations

    DEFF Research Database (Denmark)

    Grøn, Christian; Madsen, Jørgen Øgaard; Simonsen, Y.

    1996-01-01

    Leaching of a plasticizer, N-butylbenzenesulfonamide, from ground water multilevel sampling installations in nylon has been demonstrated. The leaching resulted in concentrations of DOC and apparent AOX, both comparable with those observed in landfill contaminated ground waters. It is concluded...

  10. ATLAS Tile Calorimeter central barrel assembly and installation.

    CERN Multimedia

    nikolai topilin

    2009-01-01

    These photos belong to the self-published book by Nikolai Topilin "ATLAS Hadron Calorimeter Assembly". The book is a collection of souvenirs from the years of assembly and installation of the Tile Hadron Calorimeter, which extended from November 2002 until May 2006.

  11. Installing, Configuring and Implementing an SMF in Joomla

    Directory of Open Access Journals (Sweden)

    Maria Cristina ENACHE

    2009-01-01

    Full Text Available This paper’s goal is to show how an asynchronous communication componentwhich can also be used in teaching activities was installed, configured andimplemented on the website of the Department of Accounting and EconomicInformatics of the Economics Faculty within the Dunarea de Jos University inGalati. This component is known under the name of forum or discussionboard.

  12. Multiaperture spectroscopy with rapid mask fabrication and installation

    International Nuclear Information System (INIS)

    Fort, B.; Mellier, Y.; Picat, J.P.; Lelievre, G.; Rio, Y.

    1986-03-01

    A multiaperture spectroscopy device has been installed on the focal reducer at the Cassegrain focus of the Canada-France-Hawaii Telescope. The mask processing and positioning operations are described. Emphasis is placed on the speed and reliability of a fully automatic method controlled by a computer routine. Spectra obtained during the first observations at C.F.H.T. are shown as illustration

  13. Independent Spent Fuel Storage Installations (ISFSI). Annual report, FY 1978

    International Nuclear Information System (INIS)

    Zima, G.E.

    1979-03-01

    The prime objective of the subject program is the identification of technical aspects of the design, operation and maintenance of independent spent fuel storage installations which could contribute to technical bases for Regulations and Regulatory Guides issued by NRC for these facilities. Activities on the various tasks of the program for the FY 1978 period are discussed in this report

  14. Co-occurence of Invasive Species on Priority TES Installations

    Science.gov (United States)

    2006-05-01

    Nutrient mineralization rate Nutrient immobilization rate Soil and water chemistry Altered disturbance regime Type ...with installation. Scientific name Scientific name of NIS. Form Life form of NIS. Habitat Habitat type species is most likely to occur in; F... Herbarium , Bruce Baldwin, 510-643-7008 Sea Grant, http://endeavor.des.ucdavis.edu/weeds/countylist.asp California Exotic Pest Plant Council, http

  15. Interactive Installations for Spatial Access to Artistic Sketchbooks

    DEFF Research Database (Denmark)

    Christiansen, Henning; Laursen, Bjørn

    2017-01-01

    A book is a book – or is it? With present-day, aordable technology, we can scale a book to become a spatial object, or even a space in itself, of almost arbitrary size. We describe our design of and experiences with a generic interactive installation, called Viskbook, that provides a convincing i...

  16. Spallation Neutron Source High Power RF Installation and Commissioning Progress

    CERN Document Server

    McCarthy, Michael P; Bradley, Joseph T; Fuja, Ray E; Gurd, Pamela; Hardek, Thomas; Kang, Yoon W; Rees, Daniel; Roybal, William; Young, Karen A

    2005-01-01

    The Spallation Neutron Source (SNS) linac will provide a 1 GeV proton beam for injection into the accumulator ring. In the normal conducting (NC) section of this linac, the Radio Frequency Quadupole (RFQ) and six drift tube linac (DTL) tanks are powered by seven 2.5 MW, 402.5 MHz klystrons and the four coupled cavity linac (CCL) cavities are powered by four 5.0 MW, 805 MHz klystrons. Eighty-one 550 kW, 805 MHz klystrons each drive a single cavity in the superconducting (SC) section of the linac. The high power radio frequency (HPRF) equipment was specified and procured by LANL and tested before delivery to ensure a smooth transition from installation to commissioning. Installation of RF equipment to support klystron operation in the 350-meter long klystron gallery started in June 2002. The final klystron was set in place in September 2004. Presently, all RF stations have been installed and high power testing has been completed. This paper reviews the progression of the installation and testing of the HPRF Sys...

  17. Mechanical installation for standby power house, Building No. 184-N

    Energy Technology Data Exchange (ETDEWEB)

    1960-09-01

    This specification covers the furnishing of piping, piping accessories, and certain specified mechanical equipment. Further it covers the provision of all labor, supervision, supplies, equipment and tools required for the handling, installation, painting, readying for operating and functional testing of all the equipment and systems described.

  18. Installation of one supermodule of the ALICE Transition Radiation Detector.

    CERN Multimedia

    Saba, A.

    2006-01-01

    In order to be installed in the correct position, the TRD supermodule is placed in a special rotating frame. The space to fit the module is very tight, so the insertion is monitored from outside but also from inside the space frame.

  19. Contamination of Ground Water Samples from Well Installations

    DEFF Research Database (Denmark)

    Grøn, Christian; Madsen, Jørgen Øgaard; Simonsen, Y.

    1996-01-01

    Leaching of a plasticizer, N-butylbenzenesulfonamide, from ground water multilevel sampling installations in nylon has been demonstrated. The leaching resulted in concentrations of DOC and apparent AOX, both comparable with those observed in landfill contaminated ground waters. It is concluded...... that nylon should not be used in studies of contamination with organic compounds....

  20. Safety aspects of spent nuclear fuel interim storage installations

    International Nuclear Information System (INIS)

    Romanato, Luiz Sergio

    2007-01-01

    Nowadays safety and security of spent nuclear fuel (SNF) interim storage installations are very important, due to a great concentration of fission products, actinides and activation products. In this kind of storage it is necessary to consider the physical security. Nuclear installations have become more vulnerable. New types of accidents must be considered in the design of these installations, which in the early days were not considered like: fissile material stolen, terrorists' acts and war conflicts, and traditional accidents concerning the transport of the spent fuel from the reactor to the storage location, earthquakes occurrence, airplanes crash, etc. Studies related to airplane falling had showed that a collision of big commercials airplanes at velocity of 800 km/h against SNF storage and specially designed concrete casks, do not result in serious structural injury to the casks, and not even radionuclides liberation to the environment. However, it was demonstrated that attacks with modern military ammunitions, against metallic casks, are calamitous. The casks could not support a direct impact of this ammo and the released radioactive materials can expose the workers and public as well the local environment to harmful radiation. This paper deals about the main basic aspects of a dry SNF storage installation, that must be physically well protected, getting barriers that difficult the access of unauthorized persons or vehicles, as well as, must structurally resist to incidents or accidents caused by unauthorized intrusion. (author)

  1. 47 CFR 80.268 - Technical requirements for radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... a visual indication whenever the transmitter is supplying power to the antenna. (4) Have a two-tone... between masts or other supports subject to whipping, a safety link must be installed which under heavy stress will reduce breakage of the antenna, the halyards, or any other supporting elements. (d) The...

  2. Traumatic injury among drywall installers, 1992 to 1995.

    Science.gov (United States)

    Chiou, S S; Pan, C S; Keane, P

    2000-11-01

    This study examined the traumatic-injury characteristics associated with one of the high-risk occupations in the construction industry--drywall installers--through an analysis of the traumatic-injury data obtained from the Bureau of Labor Statistics. An additional objective was to demonstrate a feasible and economic approach to identify risk factors associated with a specific occupation by using an existing database. An analysis of nonfatal traumatic injuries with days away from work among wage-and-salary drywall installers was performed for 1992 through 1995 using the Occupational Injury and Illness Survey conducted by the Bureau of Labor Statistics. Results from this study indicate that drywall installers are at a high risk of overexertion and falls to a lower level. More than 40% of the injured drywall installers suffered sprains, strains, and/or tears. The most frequently injured body part was the trunk. More than one-third of the trunk injuries occurred while handling solid building materials, mainly drywall. In addition, the database analysis used in this study is valid in identifying overall risk factors for specific occupations.

  3. Training and certification of PV installers in Europe

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Tournaki, Stavroula; Gkouskos, Zacharias; Masson, Gaetan; Holden, John; Huidobro, Ana; Stoykova, Evelina; Rata, Camelia; Bacan, Andro; Maxoulis, Christos; Charalambous, Anthi

    2013-01-01

    The European strategy for the coming decades sets specific targets for a sustainable growth, including reaching a 20% share of renewables in final energy consumption till 2020. To achieve this target, a number of initiatives and measures have been in force. Europe, is currently the largest market for PV systems with more than 75% of the annual worldwide installations in 2011. The favourable European policies as well as the Member States’ supporting legislations have resulted in high market growth for photovoltaics. Applying PV technologies however, requires high qualified technicians to install, repair and maintain them. Until today, national markets have been growing faster than the skilled PV installers force can satisfy. The PVTRIN, an Intelligent Energy Europe action, addresses these issues by developing a training and certification scheme for technicians active in the installation and maintenance of small scale PV systems. During the implementation of the action, a market research was conducted in the six participating countries in order to record the stakeholders’ attitudes, perceptions and considerations and to adapt the training methods, tools and materials to the national PV industry requirements and markets’ needs. Indicative results of this analysis as well as the current situation regarding relevant training and certification schemes are presented in this paper. - Highlights: ► Market research in six EU countries on PV professional Training and Certification needs. ► PVTRIN scheme integrates the national legislations and the market's needs. ► The different aspects (technical, institutional, financial) are presented

  4. Laboratory technology for hydrogen purification in liquefying installations

    International Nuclear Information System (INIS)

    Avram, I.; David, E.; Dordea, M.; Peculea, M.; Pop, F.; Stanciu, V.; Varzaru, O.; Panu, E.; Curuia, M.; Fron, P.; Balint, I.; Culcer, M.; Roman, T.; Smeureanu, N.

    1995-01-01

    This paper presents the development of a laboratory installation for purification of the hydrogen to be liquefied. The purification is achieved by the procedure of physical adsorption at low temperature. This procedure implies the use of materials with extensive active surfaces such as activated carbon, molecular sieves and silica gels. The main stages of the purification process are described

  5. Massive scale production and installation of flexible printed solar cells

    DEFF Research Database (Denmark)

    Hösel, Markus

    Printed solar cells can be prepared on a large scale (kilometers) on relatively small equipment using little material. The performance and lifetime are lower and shorter than many conventional PV technology but manufacturing speed, manufacturing cost, energy pay back time and installation speed can...

  6. 24 CFR 3280.709 - Installation of appliances.

    Science.gov (United States)

    2010-04-01

    ...) Vertical clearance above cooking top. Ranges shall have a vertical clearance above the cooking top of not... transporting the manufactured home. (h) A corrosion resistant water drip collection and drain pan must be installed under each water heater that will allow water leaking from the water heater to drain to the...

  7. RFAR installation for Buildings 703, 712, 747, 748 and 1163

    International Nuclear Information System (INIS)

    Ferry, M.

    1995-01-01

    This document is to certify the installation and testing of the Radio Fire Alarm Reporting box (RFAR). The Hanford Fire Dept. will be notified of troubles via RFAR. The document outlines prerequisites, necessary equipment, and the fire alarm system test to insure the system is operating correctly

  8. Installation of GEANT on a T800 transputer card

    International Nuclear Information System (INIS)

    Jejcic, A.; Maillard, J.; Silva, J.; Boun, K.K.

    1989-01-01

    The GEANT installation and verification on a single node of a transputer T800 based parallel computer T.Node is reported. Problems encountered are summarised and performances are given for several simulation conditions in high energy physics. Comparison is made with results obtained on other systems [fr

  9. 33 CFR 183.552 - Plastic encased fuel tanks: Installation.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Plastic encased fuel tanks... § 183.552 Plastic encased fuel tanks: Installation. (a) Each fuel tank encased in cellular plastic foam or in fiber reinforced plastic must have the connections, fittings, and labels accessible for...

  10. 24 CFR 3286.105 - Requirement for installer licensing.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Requirement for installer licensing. 3286.105 Section 3286.105 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...

  11. Completion of the ITER central solenoid model coils installation

    International Nuclear Information System (INIS)

    Tsuji, H.

    1999-01-01

    The short article details how dozens of problems, regarding the central solenoid model coils installation, were faced and successfully overcome one by one at JAERI-Naga. A black and white photograph shows K. Kwano, a staff member of the JAERI superconducting magnet laboratory, to be still inside the vacuum tank while the lid is already being brought down..

  12. 30 CFR 75.340 - Underground electrical installations.

    Science.gov (United States)

    2010-07-01

    ... Section 75.340 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Ventilation § 75.340 Underground...) Ventilated with intake air that is monitored for carbon monoxide or smoke by an AMS installed and operated...

  13. 46 CFR 76.30-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... EQUIPMENT Pneumatic Fire Detecting System, Details § 76.30-15 Operation and installation. (a) The system... the center of the circuit. (d) The fire detecting system shall be used for no other purpose except that it may be incorporated with the manual alarm system. (e) All wiring and electrical circuits and...

  14. 46 CFR 76.27-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system shall be used for no other purpose, except that it may be incorporated with the manual alarm...

  15. 46 CFR 76.35-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system shall be used for no other purpose, except that it may be incorporated with the fire detecting...

  16. Instability during Installation of Foundations for Offshore Structures

    DEFF Research Database (Denmark)

    Madsen, Søren; Andersen, Lars Vabbersgaard; Ibsen, Lars Bo

    2012-01-01

    caisson”. During installation, suction is applied inside the bucket. The suction creates a pressure differential across the bucket lid, effectively increasing the downward force on the bucket while the water flow reduces the skirt tip resistance. The bucket foundation is constructed as a thin shell...

  17. Installation and performance evaluation of an indigenous surface area analyser

    International Nuclear Information System (INIS)

    Pillai, S.N.; Solapurkar, M.N.; Venkatesan, V.; Prakash, A.; Khan, K.B.; Kumar, Arun; Prasad, R.S.

    2014-01-01

    An indigenously available surface area analyser was installed inside glove box and checked for its performance by analyzing uranium oxide and thorium oxide powders at RMD. The unit has been made ready for analysis of Plutonium oxide powders after incorporating several important features. (author)

  18. Documenting the Analogue Past in Marijke van Warmerdam's Film Installations

    NARCIS (Netherlands)

    Noordegraaf, J.

    2015-01-01

    Dutch visual artist Marijke van Warmerdam is best known for her film-based installations, which present simple settings or actions, such as a girl performing a handstand, in short, 16mm film loops that are projected in the gallery space. In 2011 van Warmerdam took the decision to digitize most of

  19. Nuclear installations and childhood cancer in the UK

    International Nuclear Information System (INIS)

    Goldsmith, J.R.

    1992-01-01

    Data on cancer incidence and mortality near nuclear installations in England and Wales have been published, covering the period 1959-1980. Several age classes and a number of cancer sites have been included. Systematic analysis has so far been limited to cancer mortality. This suggests that childhood leukemia is unusually frequent near some types of installations and the excess is greater for years 0-9 than for later ages. In the earlier decade, 1959-1969, there was questionable consistency of incidence reporting. This report uses the incidence and mortality data only for the period 1971-1980; leukemia and non-leukemia cancer data for those 0-9 years are analyzed, and consistency of incidence reporting is evaluated by comparing incidence and mortality. For comparison with reported data for grouped local authority areas (LAAs) near to 21 different installations, 2 sources of expected incidence are used. The first is based on regional data, and the second is based on a group of LAAs similar in location, urban/rural character and population size. The results of this study confirm Cook-Mozaffari et al.'s findings by mortality analysis for the group of installations involved in non-power producing nuclear technology. This study sheds no light on the possible basis for the association, which remains to be clarified. Initial steps have been taken by Gardner et al. using case-referent methods. (author). 15 refs., 3 figs., 7 tabs

  20. Streamlining U.S. Army Military Installation Map (MIM) Production

    Science.gov (United States)

    2010-06-01

    Assurance Plans ( QAPs ). Serves as the standardized data structure across all Army training and testing installations. Once populated, this...produced NGA MIMs and supporting documentation. All aspects reflect the layout, fonts, and features which are common to MIMs. Based on SRP QAP (CIP