WorldWideScience

Sample records for splicer line installer

  1. spliceR

    DEFF Research Database (Denmark)

    Vitting-Seerup, Kristoffer; Porse, Bo Torben; Sandelin, Albin

    2014-01-01

    RNA-seq data is currently underutilized, in part because it is difficult to predict the functional impact of alternate transcription events. Recent software improvements in full-length transcript deconvolution prompted us to develop spliceR, an R package for classification of alternative splicing...

  2. Problem solving with genetic algorithms and Splicer

    Science.gov (United States)

    Bayer, Steven E.; Wang, Lui

    1991-01-01

    Genetic algorithms are highly parallel, adaptive search procedures (i.e., problem-solving methods) loosely based on the processes of population genetics and Darwinian survival of the fittest. Genetic algorithms have proven useful in domains where other optimization techniques perform poorly. The main purpose of the paper is to discuss a NASA-sponsored software development project to develop a general-purpose tool for using genetic algorithms. The tool, called Splicer, can be used to solve a wide variety of optimization problems and is currently available from NASA and COSMIC. This discussion is preceded by an introduction to basic genetic algorithm concepts and a discussion of genetic algorithm applications.

  3. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  4. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  5. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  6. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photo 01: Pictured with the newly installed magnet and transport system in the transfer line tunnel are (left to right) Volker Mertens, responsible for the LHC injection and transfer lines; personnel involved in tr...

  7. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photos 01, 02: Pictured with the newly installed magnet and transport system in the transfer line tunnel are LHC project leader Lyn Evans (second left, white helmet); Volker Mertens, responsible for the LHC injecti...

  8. Helium transfer line installation details.

    CERN Multimedia

    G. Perinic

    2007-01-01

    A particularity of the 32 m long four in one helium transfer line in between the cold box in USC55 and the cavern UX5 is the fact that the transfer line passes through a hole in the crane rail support beam. In order to ensure the alignment of the suspension rail in the interconnecting tunnel with the hole in the rail support as well as the connection points at both ends required precise measurements of the given geometries as well as the installation of a temporary target for the verification of the theoretical predictions.

  9. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system. Here we see the transport vehicle alongside the magnet supports. Visible in the background is the first magnet in place.

  10. Installation of the LHC transfer lines begins

    CERN Multimedia

    2003-01-01

    On 19 February, the very first magnet was installed in one of the two tunnels that will house the transfer lines leading to the LHC. This magnet, recycled from a previous facility, was transported and positioned using a novel system designed for conveying large objects through narrow tunnels.

  11. An Installation of IPS Bypass Line at the Fuel Test Loop

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Ho Young; Ahn, G. H.; Lee, M.; Kim, M. S.; Cho, S. H.; Han, J. S.; Hur, S. O. [KAERI, Daejeon (Korea, Republic of)

    2010-12-15

    The Fuel Test Loop(FTL) was installed for the national goal of self-supporting technology in the field of design and construction of nuclear power plant. The FTL with the fuel irradiation equipment is essential in developing, improving and inspecting the fuel of CANDU type or PWR type nuclear power plant. The FTL should be operated at the same conditions of commercial nuclear power plant such as temperature, pressure, flow rate, neutron flux and so on. Starting designing in December 2001, the FTL was installed from March 2007 to August 2008. Especially the In Pile Section(IPS) was installed at IR1 hole in August 2008. Until September 2009 after loading the test fuel, a series of power escalation tests (LSD, CSB1, CSB2, HSB, HOP) were conducted. And it was operated at the condition of CSB2 for the 8 cycles from October 2009 to July 2010. But it could not be normally operated in early 2010, because the high radiation released from irradiated materials due to the worn down bearing of main cooling pump. So, we removed the IPS and installed a newly designed IPS bypass line to prevent increasing high radiation. In this report we will present preliminary works, main works processes, devices of making work environments, a designing and manufacturing of IPS bypass line and a rack of IPS, installing know-hows, problems and solutions broke out during the work etc. We believe that our efforts to complete successful installing and operating of the FTL system will contribute for the efficient utilization of HANARO

  12. Practices for improving the serviceability of linings installations in open systems

    Energy Technology Data Exchange (ETDEWEB)

    Spieres, G.V. [KTA - Tator Inc., Pittsburgh, PE (United States); Tombaugh, R.S. [PPL Susquehanna, LLC, PE (United States)

    2001-07-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  13. Practices for improving the serviceability of linings installations in open systems

    International Nuclear Information System (INIS)

    Spieres, G.V.; Tombaugh, R.S.

    2001-01-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  14. Predictive FEM simulation of thermal shock damage in the refractory lining of steelmaking installations

    NARCIS (Netherlands)

    Damhof, F.; Brekelmans, W.A.M.; Geers, M.G.D.

    2011-01-01

    Thermal shock damage in the refractory lining of steelmaking installations is modelled using an experimentally validated constitutive damage framework which is coupled incrementally with a thermo-elastic FE package. Both non-local elasticity-based damage induced by temperature gradients and thermal

  15. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  16. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  17. Fiber Optics Technology.

    Science.gov (United States)

    Burns, William E.

    1986-01-01

    Discusses various applications of fiber optics technology: information systems, industrial robots, medicine, television, transportation, and training. Types of jobs that will be available with fiber optics training (such as electricians and telephone cable installers and splicers) are examined. (CT)

  18. Managing the risks of the backfill production line from material acquisition to installation

    International Nuclear Information System (INIS)

    Kiviranta, Leena; Kumpulainen, Sirpa; Keto, Paula; Autio, Jorma; Siivonen, Markku; Koho, Petri

    2012-01-01

    Document available in extended abstract form only. The tunnel backfill of Finnish KBS-3V type repository for spent nuclear fuel consists of foundation layer that is installed at site, pre-compacted backfill blocks that fill most of the tunnel and bentonite pellets to fill the gap between blocks and tunnel wall. In order to ensure the quality, availability, and timely delivery of backfill materials and components, and further to ensure the fulfillment of the requirements and specifications set for backfilling of deposition tunnels, the backfill production line was explored step-by-step, and risks related were defined and analyzed. The work described in this paper was initiated by Posiva Oy and is reported in Keto et al. (2012). The first part of the backfill production line is described in Figure 1 for Friedland clay that is designed to be used for the backfill blocks. It consists of excavation, processing and delivery of materials to backfill production facility. Second part of the production line consists of manufacturing of the backfill components, and the third part is the installation. A preliminary risk assessment was done in 2011 for the acquisition of Friedland clay and manufacturing and installation of foundation layer, blocks and pellets. The critical points of the production line were determined using a material flow description where risk is defined as a probability of something unwanted to happen times the severity of the consequences. Risk analysis was performed by going through the whole backfill production line step by step and analyzing all the incidents, which have occurred (or might occur) during the backfilling operations. A risk number from 1 to 25 was given to each step of the chain depending on how long delay the problem causes and how often it occurs. Low risk was the target for each step of the chain, medium risk was considered tolerable, for high risks management actions to decrease the risk number were considered and extremely high risks

  19. Analysis quality of content digital plan of cadastre lines (underground installation

    Directory of Open Access Journals (Sweden)

    Marinković Goran

    2016-01-01

    Full Text Available This work presents the results of research quality digital geodetic plans lines and underground installations. The study included the creation of a digital geodetic plan sewerage network vectorization of analogue geodetic plans and creation of digital geodetic plan of the same details from the original data survey and maintenance survey. Based on research results the analysis of the accuracy and reliability digital geodetic plan created vectoring analogue plan or 'digitizing from the screen'. The results obtained in this work, the can be use not only in the Republic of Serbia, but also in other countries where digitalization of geodetic plans are increasingly gaining in importance.

  20. Manufacturing and Installation of the Compound Cryogenic Distribution Line for the Large Hadron Collider

    CERN Document Server

    Riddone,, G; Bouillot, A; Brodzinski, K; Dupont, M; Fathallah, M; Fournel, JL; Gitton, E; Junker, S; Moussavi, H; Parente, C; Riddone, G

    2007-01-01

    The Large Hadron Collider (LHC) [1] currently under construction at CERN will make use of superconducting magnets operating in superfluid helium below 2 K. A compound cryogenic distribution line (QRL) will feed with helium at different temperatures and pressures the local elementary cooling loops in the cryomagnet strings. Low heat inleak to all temperature levels is essential for the overall LHC cryogenic performance. Following a competitive tendering, CERN adjudicated in 2001 the contract for the series line to Air Liquide (France). This paper recalls the main features of the technical specification and shows the project status. The basic choices and achievements for the industrialization phase of the series production are also presented, as well as the installation issues and status.

  1. Feasibility of evaluating possible 85Kr environmental contamination from neon lamp production line to be installed

    International Nuclear Information System (INIS)

    Li Guangzuo

    1989-01-01

    Using a simplified method, the concentrations of 85 Kr leaking into the air of a workshop and its surroundings, where a neon lamp production line was to be installed, were calculated. The doses to the workers and inhabitants nearby were also estimated. Thus, the evaluation of 85 Kr enviromental contamination caused by imported equipments was made feasible

  2. Understanding Local Policy Elites' Perceptions on the Benefits and Risks Associated with High-Voltage Power Line Installations in the State of Arkansas.

    Science.gov (United States)

    Moyer, Rachael M; Song, Geoboo

    2016-10-01

    Recently, a controversial policy debate has arisen concerning the installation of high-voltage power lines in northwest Arkansas. While proponents argue that such an installation is inevitable to efficiently and reliably support the identified electric load in the region, opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. Of particular interest is to understand how local policy elites perceive the benefits and risks associated with such divisive proposals, which is critical for comprehending the formation and changes of related government policies. Based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high-voltage power lines among local policy elites in the state of Arkansas. In doing so, we analyze original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, while considering other factors claimed by previous literature to influence risk perceptions, including trust, knowledge level, and demographic characteristics. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly-through affective feelings-shape perceived utility associated with the installation of high-voltage power lines. We conclude this article by suggesting some practical considerations for better designing policy addressing controversial issues of this nature. © 2016 Society for Risk Analysis.

  3. Feasibility Study for Installing Machine in Production Line to Avoid Particle Contamination Based on CFD Simulation

    Science.gov (United States)

    Khaokom, Adisorn; Thongsri, Jatuporn

    2017-10-01

    Ventilation system inside production line for electronic component production needs to meet the factory standard. Because it can eliminate small particles which may cause of human or machine in production as well as it can distribute the circulating air temperature uniformly. CFD is used in this research in order to study the feasibility and plan for machine layout in production line before actual installation. The simulation shows the airflow in every area inside production line. From simulation with releasing the particles from human and machine is found that this ventilation system generates airflow that makes most particles float out of the machines and no particle downs to the conveyor, it results to contamination. In addition, the simulation also shows the range of 19-26 °C air temperature that meets the factory standard. The results of this research are the parts of the data to renovate the production line to get more efficiency and proper on the production.

  4. Technical-parameter calculation model for underground low-power electrical lines and indoor installations used in telecommunications

    Directory of Open Access Journals (Sweden)

    Henry Bastidas Mora

    2011-09-01

    Full Text Available This article presents an analysis of electrical distribution theory for 60Hz-lines operating at low voltage, particularly underground lines and residential indoor installations. Such distribution lines’ behaviour is observed as a function of frequency to consider any advantages regarding the potential use of power transmission lines (PTL for transmitting telecommunication signals. A method for computing the secondary parameters is proposed which has been based on the primary parameters, namely inductance, capacitance, conductance and resistance. The secondary parameters so obtained were characteristic impedance, propagation constant (together with its real value and the attenuation constant. Conductor configurations, insulation materials and gauges commonly used in Colombia were verified for such low-voltage lines. A mathematical model is proposed as a theoretical tool for analysing and predicting characteristic impedance pattern and the attenuations which occur at high frequencies, thereby complementing our group’s previous work. Conclusions are drawn, together with a perspective regarding future work and applications.

  5. Feasibility of evaluating possible sup 85 Kr environmental contamination from neon lamp production line to be installed

    Energy Technology Data Exchange (ETDEWEB)

    Guangzuo, Li [Chengdu Sanitary-Epidemiological Station, Chengdu, SC (China)

    1989-12-01

    Using a simplified method, the concentrations of {sup 85}Kr leaking into the air of a workshop and its surroundings, where a neon lamp production line was to be installed, were calculated. The doses to the workers and inhabitants nearby were also estimated. Thus, the evaluation of {sup 85}Kr enviromental contamination caused by imported equipments was made feasible.

  6. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  7. The Power Behind the Controversy: Understanding Local Policy Elites' Perceptions on the Benefits and Risks Associated with High Voltage Power Line Installation in the State of Arkansas

    Science.gov (United States)

    Moyer, Rachael M.

    Following a proposal for the installation of high voltage power lines in northwest Arkansas, a controversial policy debate emerged. Proponents of the transmission line argue that such an installation is inevitable and necessary to efficiently and reliably support the identified electric load in the region. Opponents claim that the lines will degrade the natural environment and hamper the tourism-based local economy in affected regions, notably in Ozark Mountain areas. This study seeks to understand how local policy elites perceive the benefits and risks associated with proposed transmission lines, which is a critical step in comprehending the formation and changes of related government policies. First, based upon the dual process theory of judgment, this study systematically investigates the triadic relationships between (a) more profound personal value predispositions, (b) affects and feelings, and (c) perceived benefits and risks related to the proposed installation of high voltage power lines among local policy elites in the state of Arkansas. Next, this study focuses more specifically on the role of value predispositions, specific emotional dimensions of affect heuristics, and perceptions pertaining to high voltage power line risks and benefits. Using original data collected from a statewide Internet survey of 420 local leaders and key policymakers about their opinions on the related issues, other factors claimed by previous literature, including trust, knowledge level, and demographic characteristics are considered. Analytical results suggest that grid-group cultural predispositions, as deeply held core values within local policy elites' individual belief systems, both directly and indirectly -- through affective feelings -- shape perceived utility associated with the installation of high voltage power lines. Recognizing that risk perceptions factor into policy decisions, some practical considerations for better designing policy addressing controversial issues

  8. The analysis of the external factors influence on the efficiency of the absorption heat pumps inclusion in the scheme of a two-stage line installation of a STP

    Directory of Open Access Journals (Sweden)

    Luzhkovoy Dmitriy S.

    2017-01-01

    Full Text Available The article deals with a comparative analysis of the efficiency of a two-stage line installation in a heating turbine before and after the inclusion of absorption heat pumps into its scheme with a decrease in the outside air temperature. The research shows the dependence of the efficiency of the line installation on its heat load while using AHP in its scheme, as well as on the heat conversion factor of the absorption heat pumps.

  9. TU-H-BRA-07: Design, Construction, and Installation of An Experimental Beam Line for the Development of MRI-Linac Compatible Electron Accelerator

    International Nuclear Information System (INIS)

    Whelan, B; Keall, P; Holloway, L; Gierman, S; Schmerge, J; Tantawi, S; Tremaine, A; Trautwein, A; Scott, B; Fahrig, R

    2016-01-01

    Purpose: MRI guided radiation therapy (MRIgRT) is a rapidly growing field; however, Linac operation in MRI fringe fields represents an ongoing challenge. We have previously shown in-silico that Linacs could be redesigned to function in the in-line orientation with no magnetic shielding by adopting an RF-gun configuration. Other authors have also published insilico studies of Linac operation in magnetic fields; however to date no experimental validation data is published. This work details the design, construction, and installation of an experimental beam line to validate our in-silico results. Methods: An RF-gun comprising 1.5 accelerating cells and capable of generating electron energies up to 3.2MeV is used. The experimental apparatus was designed to monitor both beam current (toroid current monitor), spot size (two phosphor screens with viewports), and generate peak magnetic fields of at least 1000G (three variable current electromagnetic coils). Thermal FEM simulations were developed to ensure coil temperature remained within 100degC. Other design considerations included beam disposal, vacuum maintenance, radiation shielding, earthquake safety, and machine protection interlocks. Results: The beam line has been designed, built, and installed in a radiation shielded bunker. Water cooling, power supplies, thermo-couples, cameras, and radiation shielding have been successfully connected and tested. Interlock testing, vacuum processing, and RF processing have been successfully completed. The first beam on is expected within weeks. The coil heating simulations show that with care, peak fields of up to 1200G (320G at cathode) can be produced using 40A current, which is well within the fields expected for MRI-Linac systems. The maximum coil temperature at this current was 84degC after 6 minutes. Conclusion: An experimental beam line has been constructed and installed at SLAC in order to experimentally characterise RF gun performance in in-line magnetic fields, validate

  10. TU-H-BRA-07: Design, Construction, and Installation of An Experimental Beam Line for the Development of MRI-Linac Compatible Electron Accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Whelan, B; Keall, P [University of Sydney, Sydney (Australia); Holloway, L [Liverpool Hospital and Ingham Institute, Liverpool, NSW (United Kingdom); Gierman, S; Schmerge, J; Tantawi, S; Tremaine, A; Trautwein, A; Scott, B [Stanford Linear Accelerator Facility, Palo Alto, CA (United States); Fahrig, R [Siemens Healthcare GmbH, Forchheim (Germany)

    2016-06-15

    Purpose: MRI guided radiation therapy (MRIgRT) is a rapidly growing field; however, Linac operation in MRI fringe fields represents an ongoing challenge. We have previously shown in-silico that Linacs could be redesigned to function in the in-line orientation with no magnetic shielding by adopting an RF-gun configuration. Other authors have also published insilico studies of Linac operation in magnetic fields; however to date no experimental validation data is published. This work details the design, construction, and installation of an experimental beam line to validate our in-silico results. Methods: An RF-gun comprising 1.5 accelerating cells and capable of generating electron energies up to 3.2MeV is used. The experimental apparatus was designed to monitor both beam current (toroid current monitor), spot size (two phosphor screens with viewports), and generate peak magnetic fields of at least 1000G (three variable current electromagnetic coils). Thermal FEM simulations were developed to ensure coil temperature remained within 100degC. Other design considerations included beam disposal, vacuum maintenance, radiation shielding, earthquake safety, and machine protection interlocks. Results: The beam line has been designed, built, and installed in a radiation shielded bunker. Water cooling, power supplies, thermo-couples, cameras, and radiation shielding have been successfully connected and tested. Interlock testing, vacuum processing, and RF processing have been successfully completed. The first beam on is expected within weeks. The coil heating simulations show that with care, peak fields of up to 1200G (320G at cathode) can be produced using 40A current, which is well within the fields expected for MRI-Linac systems. The maximum coil temperature at this current was 84degC after 6 minutes. Conclusion: An experimental beam line has been constructed and installed at SLAC in order to experimentally characterise RF gun performance in in-line magnetic fields, validate

  11. Visiting the SPS installation

    CERN Multimedia

    1975-01-01

    ...., Guenther Loehr, Hans Horisberger walk along the SPS tunnel: here, on the right, an absorber block of 22 tons for beam dumping in the external beam lines. The chariot serves for the installation of the block.

  12. 49 CFR 192.321 - Installation of plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  13. Nuclear installations and their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October 15, 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (authors)

  14. Installation of a tandem-type accelerator mass spectrometer

    International Nuclear Information System (INIS)

    Mizushima, Toshihiko; Togawa, Orihiko; Mizutani, Yoshihiko; Yamamoto, Tadatoshi

    2000-02-01

    Tandem-type accelerator mass spectrometer (hereinafter referred to as Tandetron) was installed at the Ominato Facility of Mutsu Establishment, JAERI in April, 1997. The objective of its installation is to investigate the mechanism of the mixing and circulation of seawater in the ocean, by collecting seawater samples around Japan and analyzing the horizontal and vertical distributions of 14 C contained in the samples. The Tandetron consists of two lines to measure isotopic ratios of carbon and those of heavier iodine. The adjustment for the carbon line was finished and the measurements of seawater samples were started. The iodine line, on the other hand, is on the final step of its adjustment and performance tests are being carried out with a TOF (Time of Flight) detector. The iodine line will be used to analyze 129 I released from a spent nuclear fuel reprocessing plant and other nuclear facilities. In this report, we summarize the status of installation of the carbon and iodine lines for the Tandetron. The report describes the situations of their adjustments until now, the outline of the Tandetron, tests of measurement performance, evaluation and inspection of shielding performance, problems and their solutions, and so on. (author)

  15. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XVII, I--MAINTAINING THE LUBRICATION SYSTEM--CUMMINS DIESEL ENGINE, II--UNIT INSTALLATION AND REMOVAL--DRIVE LINES.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…

  16. Project installation the large equipment in line system in Brazil. Gas export line valve P-40 FPSO-MLS. Field Marlim Sul, Campos Basin, Brazil; Operacao de instalacao do maior equipamento no sistema in line ja realizado no Brasil. Valvula do gasoduto P-40 X FPSO-MLS. Campo de Marlim Sul, Bacia de Campos, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Marques, Marcos Antonio Rodrigues; Fernandes, Paulo Tavares [PETROBRAS, Campos dos Goytacases, RJ (Brazil). Exploracao e Producao

    2005-07-01

    This work will approach the current level of development of the installation of connected underwater equipment to flexible lines in the underwater engineering operations in Campos' Basin. The project will show studies, analysis and simulations (through software developed by PETROBRAS) about the installation of the largest equipment laid in the 'in-line' system (connected to flexible lines) in Brazil - and one of the largest of the world: the ESDV (Emergency Shut Down Valve) of the gas pipeline P-40 x FPSO-MLS, in the South Marlim field, in Campos' Basin. This ESDV, of about 18.000 kg, 4 m height and 6,5 m length, has the purpose of assuring the safety conditions on the facilities, interrupting the gas flow exported for P-40 in case of emergency situations. Its installation opened a new alternative in releasing underwater equipment, using the ships that install the flexible lines. This operation occurred in June, 2004, and required the use of a second vessel for support and monitoring of the ESDV laying. The ESDV was installed at 400 m from FPSO-MLS, in a water depth of 1.137 m. This method shall be used broadly by the company in the implantation of the new units of Campos' Basin, and the upcoming studies must consider the gradual increase of the water depth in the new projects. This work will focus the technological development in this area, and one of its purposes is to foresee the future difficulties that can appear in the implantation of the production systems in deep and ultra-deep waters. (author)

  17. Mechanical Behaviour of Lined Pipe

    NARCIS (Netherlands)

    Hilberink, A.

    2011-01-01

    Installing lined pipe by means of the reeling installation method seems to be an attractive combination, because it provides the opportunity of eliminating the demanding welds from the critical time offshore and instead preparing them onshore. However, reeling of lined pipe is not yet proven

  18. Automated eddy-current installation AVD-01 for detecting flaws in fuel element cans

    International Nuclear Information System (INIS)

    Varvaritsa, V.P.; Martishchenko, L.G.; Popov, V.K.; Romanov, M.L.; Shlepnev, I.O.; Shmatok, V.P.

    1986-01-01

    This paper describes an automated installation for eddy-current flaw detection in thin-walled pipes with small diameter; its unified transport system makes it possible to use the installation in inspection lines and production lines of fuel elements. The article describes the structural diagrams of the installation and presents the results of investigations connected with the selection for establishing the optimum regimes and sensitivity of feedthrough transducers with focusing screens

  19. 49 CFR 192.359 - Customer meter installations: Operating pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meter installations: Operating pressure... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure...

  20. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meters and regulators: Installation. 192... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a...

  1. The installation and dismantling of electrolytic cells

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to construction of aluminium electrolytic cells, their installation and dismantling. Therefore, the general characteristic and classification of aluminium electrolytic cells was considered. The anode and cathode structure was studied. The lining of cathode casing, the process of collection of anode gases, electrolytic cell cover, and electrical insulation was studied as well. The installation and dismantling of aluminium electrolytic cells was described.

  2. The Origin and Role of Trust in Local Policy Elites' Perceptions of High-Voltage Power Line Installations in the State of Arkansas.

    Science.gov (United States)

    Tumlison, Creed; Moyer, Rachael M; Song, Geoboo

    2017-05-01

    The debate over an installation of high-voltage power lines (HVPLs) has been intense, particularly in northwest Arkansas. Detractors claim that the installation will negatively affect both the natural environment and the local economy, which contains a large tourism component. By contrast, those in favor of installing HVPLs claim that the installation is necessary in order to reliably support the increasing demand for electric power. Using original data collected from a recent statewide Internet survey of 420 local policy elites in Arkansas, this article focuses on two key aspects. First, we examine how local policy elites' perceptions of risks versus benefits of HVPL installation in their communities are influenced by their levels of trust toward information provided by various sources (e.g., energy industry, environmental groups, and government). Second, we utilize cultural theory to explain how the cultural worldviews of policy elites--specifically, egalitarianism, individualism, hierarchism, and fatalism--shape these levels of trust and HVPL benefit-risk perceptions, while controlling for other factors claimed by previous literature, including levels of knowledge on energy-related issues and demographic characteristics. In general, our analysis indicates that policy elites' value-oriented formation of HVPL benefit-risk perceptions is partially due to the influence cultural values have on trust in information sources. We conclude this article by discussing broader implications for the origin and role of trust in policy elites' decisions throughout the policy-making process. © 2016 Society for Risk Analysis.

  3. The nuclear installations face to their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October fifteenth 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (author)

  4. 47 CFR 68.213 - Installation of other than “fully protected” non-system simple customer premises wiring.

    Science.gov (United States)

    2010-10-01

    ... only to “unprotected” premises wiring used with simple installations of wiring for up to four line residential and business telephone service. More complex installations of wiring for multiple line services... requirements, for installation and maintenance of wiring on the subscriber's side of the demarcation point...

  5. 30 CFR 817.180 - Utility installations.

    Science.gov (United States)

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  6. Buffer protection in the installation phase

    International Nuclear Information System (INIS)

    Wimelius, Hans; Pusch, Roland

    2008-12-01

    The research and development of the design and construction of the SKB's repository for final disposal of spent reactor fuel is conducted along several paths ('lines'). Issues concerning the bedrock are dealt with in the 'rock line' and those related to buffer and backfill in deposition holes and tunnels are considered in the 'buffer line' and 'backfill line', respectively. These lines also deal with sub-activities that are coupled to several other lines. One of them includes development of techniques for protecting buffer blocks from moisture and water in the installation phase. Techniques and methods for placement and removal of the 'buffer protection sheet' are dealt with in the 'buffer line'. The removal is, however, considered as being part of the backfilling sequence. Since the performance of the sheet is of fundamental importance to the placement and function of the buffer it deserves particular attention. Thus, the removal of the rubber sheet that serves to protect the buffer blocks in the installation phase may be difficult and can cause significant problems that may require retrieval of already placed canister, buffer and backfill. These matters are in focus in the present report. Arrangements for protecting already placed buffer blocks from moist air and water have been tested in earlier large-scale experiments, i.e. the Prototype Repository project at Aespoe but the experience from them has called for more effective protection of the clay blocks as described in the present report. Focus is on the construction of foundation components at the bottom of the deposition holes required for establishing a tight seal between rock and buffer blocks, and on the protection sheet and arrangements for limiting water pressure on it. Special attention is paid to the drainage of the space between rock and protection sheet that is necessary for avoiding failure of the sheet and to systems for achieving this and for providing alarm signals if the allowed pressure is

  7. Design basis and requirements for 241-SY modular exhauster mechanical installation

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1994-01-01

    A new ventilation system is being installed to serve as the K-1 primary exhauster. The existing K-1 primary exhauster will then become the backup. This ventilation system services waste tanks 241-SY-101, 102 and 103. The nominal flow rate through the ventilation system is 1,000 cfm. The new ventilation system will contain a moisture eliminator, a heater, a prefilter, two stages of HEPA filtration, an exhaust fan, a stack and stack sampling system. The purpose of this document is to serve as the design and functional requirements for the mechanical installation of the new 241-SY modular exhauster. The mechanical installation will include modifying the existing ductwork (i.e., installing a ''T'' to connect the new exhauster to the existing system), modifying the existing condensate drain lines to accommodate the new lines associated with the new exhauster, a maintenance platform near the stack of the new exhauster, guy wires and guy wire footings to support the stack of the new exhauster, as well as other miscellaneous tasks associated with the mechanical installation design effort

  8. HYDRAULIC ELEVATOR INSTALLATION ESTIMATION FOR THE WATER SOURCE WELL SAND-PACK CLEANING UP

    Directory of Open Access Journals (Sweden)

    V. V. Ivashechkin

    2016-01-01

    Full Text Available The article offers design of a hydraulic elevator installation for cleaning up water-source wells of sand packs. It considerers the installation hydraulic circuit according to which the normal pump feeds the high-level tank water into the borehole through two parallel water lines. The water-jet line with washing nozzle for destroying the sand-pack and the supply pipe-line coupled with the operational nozzle of the hydraulic elevator containing the inlet and the supply pipelines for respectively intaking the hydromixture and removing it from the well. The paper adduces equations for fluid motion in the supply and the water-jet pipelines and offers expressions for evaluating the required heads in them. For determining water flow in the supply and the water-jet pipe lines the author proposes to employ graphical approach allowing finding the regime point in Q–H chart by means of building characteristics of the pump and the pipe-lines. For calculating the useful vertical head, supply and dimensions of the hydraulic elevator the article employs the equation of motion quantity with consistency admission of the motion quantity before and after mixing the flows in the hydraulic elevator. The suggested correlations for evaluating the hydraulic elevator efficiency determine the sand pack removal duration as function of its sizes and the ejected fluid flow rate. A hydraulic-elevator installation parameters estimation example illustrates removing a sand pack from a water-source borehole of 41 m deep and 150 mm diameter bored in the village of Uzla of Myadelsk region, of Minsk oblast. The working efficiency of a manufactured and laboratory tested engineering prototype of the hydraulic elevator installation was acknowledged in actual tests at the indicated borehole site. With application of graphical approach, the suggested for the hydraulic elevator installation parameters calculation procedure allows selecting, with given depth and the borehole diameter

  9. Rehyd development and installation report

    International Nuclear Information System (INIS)

    Schuch, R.L.; Woodall, H.N.

    1977-12-01

    Rehyd, a low-impedance, HYDRA-type, water transmission line for bremsstrahlung exposures, was installed on the north side of the REBA facility. Rehyd produces 300 kA beams of 1.2 MeV electrons with a pulse width of 170 ns. Nominal x-ray exposure dose capabilities of 7 cal/g and 20 to 25 kJ were realized thus far. A description is given of the specific design parameters and facility layouts including the unique features of the REBA Marx generator/Rehyd line energy-transfer system. Diode configurations, magnetic-field applications, and output measurements are also presented

  10. Toroid field coil shear key installation study, DOE task No. 22

    International Nuclear Information System (INIS)

    Jones, C.E.; Meier, R.W.; Yuen, J.L.

    1995-01-01

    Concepts for fitting and installation of the scissor keys, triangular keys, and truss keys in the ITER Toroidal Field (TF) Coil Assembly were developed and evaluated. In addition, the process of remote removal and replacement of a failed TF coil was considered. Two concepts were addressed: central solenoid installed last (Naka Option 1) and central solenoid installed first (Naka Option 2). In addition, a third concept was developed which utilized the favorable features of both concepts. A time line for installation was estimated for the Naka Option 1 concept

  11. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  12. Installation and commissioning of a cryogen distribution system for the TPS project

    Science.gov (United States)

    Tsai, H. H.; Hsiao, F. Z.; Li, H. C.; Lin, M. C.; Wang, C.; Liao, W. R.; Lin, T. F.; Chiou, W. S.; Chang, S. H.; Chuang, P. S. D.

    2016-07-01

    A cryogen distribution system was installed and commissioned to transfer liquid nitrogen (LN2) and liquid helium (LHe) from storage dewars to superconducting radio-frequency (SRF) cavities for the 3-GeV Taiwan Photon Source (TPS) project. The cryogen distribution system comprises one distribution valve box (DVB), four control valve boxes (CVB) and seven sections of multichannel transfer line (MCL). The DVB distributes the LHe and LN2 to the CVB, and then to the SRF cavities through independent vacuum-jacketed transfer lines. The vaporized GHe and GN2 from the cryomodules are collected via the MCL. The cryogen distribution system was installed and commissioned from October 2014 to the end of March 2015. This paper presents the installation, pre-commissioning and commissioning of the cryogen distribution system, and describes the heat load test. Thermal acoustic oscillation (TAO) was found in the GHe process line; this phenomenon and its solution are also presented and discussed.

  13. Preliminary Guidelines for Installation Product Line Land Management Suite (LMS) Product Developers

    National Research Council Canada - National Science Library

    Westervelt, James; Dilks, Kelly M; Goran, William D

    2005-01-01

    .... This document provides an introduction to the new technologies and techniques and is written for all involved with installation land management software development including managers, supervisors...

  14. Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to the book “Guidelines for Building a Private Cloud Infrastructure”. This document provides guidance on how to install Ubuntu Enterprise Cloud in virtual environment, and afterwards how to scale out when needed. The purpose of this supplemental book...... is to provide a practical, step-by-step, detailed guide on how to dimension and install the machines and network. Some initial steps of configuring the cloud are also covered. The installation is performed in a virtual environment based on Windows 7 and VMware Workstation 7. The cloud installation is performed...... cloud, both using the command line tools, and GUI based tool HybridFox....

  15. Lightning Performance on Overhead Distribution Lines : After Improvement Field Observation

    Directory of Open Access Journals (Sweden)

    Reynaldo Zoro

    2009-11-01

    Full Text Available Two feeders of 20 kV overhead distribution lines which are located in a high lightning density area are chosen to be observed as a field study due to their good lightning performance after improvement of lightning protection system. These two feeders used the new overhead ground wire and new line arrester equipped with lightning counter on the main lines. The significant reduced of lines outages are reported. Study was carried out to observe these improvements by comparing to the other two feeders line which are not improved and not equipped yet with the ground wire and line arrester. These two feeders located in the nearby area. Two cameras were installed to record the trajectory of the lightning strikes on the improved lines. Lightning peak currents are measured using magnetic tape measurement system installed on the grounding lead of lightning arrester. Lightning overvoltage calculations are carried out by using several scenarios based on observation results and historical lightning data derived from lightning detection network. Lightning overvoltages caused by indirect or direct strikes are analyzed to get the lightning performance of the lines. The best scenario was chosen and performance of the lines were improved significantly by installing overhead ground wire and improvement of lightning arrester installation.

  16. Buffer protection in the installation phase

    Energy Technology Data Exchange (ETDEWEB)

    Wimelius, Hans (Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)); Pusch, Roland (Geodevelopment International AB, Lund (Sweden))

    2008-12-15

    The research and development of the design and construction of the SKB's repository for final disposal of spent reactor fuel is conducted along several paths ('lines'). Issues concerning the bedrock are dealt with in the 'rock line' and those related to buffer and backfill in deposition holes and tunnels are considered in the 'buffer line' and 'backfill line', respectively. These lines also deal with sub-activities that are coupled to several other lines. One of them includes development of techniques for protecting buffer blocks from moisture and water in the installation phase. Techniques and methods for placement and removal of the 'buffer protection sheet' are dealt with in the 'buffer line'. The removal is, however, considered as being part of the backfilling sequence. Since the performance of the sheet is of fundamental importance to the placement and function of the buffer it deserves particular attention. Thus, the removal of the rubber sheet that serves to protect the buffer blocks in the installation phase may be difficult and can cause significant problems that may require retrieval of already placed canister, buffer and backfill. These matters are in focus in the present report. Arrangements for protecting already placed buffer blocks from moist air and water have been tested in earlier large-scale experiments, i.e. the Prototype Repository project at Aespoe but the experience from them has called for more effective protection of the clay blocks as described in the present report. Focus is on the construction of foundation components at the bottom of the deposition holes required for establishing a tight seal between rock and buffer blocks, and on the protection sheet and arrangements for limiting water pressure on it. Special attention is paid to the drainage of the space between rock and protection sheet that is necessary for avoiding failure of the sheet and to systems for achieving

  17. Cable line engineering

    International Nuclear Information System (INIS)

    Jang, Hak Sin; Kim, Sin Yeong

    1998-02-01

    This book is about cable line engineering. It is comprised of nine chapters, which deals with summary of cable communication such as way, process of cable communication and optical communication, Line constant of transmission on primary constant, reflection and crosstalk, communication cable line of types like flat cable, coaxial cable and loaded cable, Install of communication line with types and facility of aerial line, construction method of communication line facility, Measurement of communication line, Carrier communication of summary, PCM communication with Introduction, regeneration relay system sampling and quantization and Electric communication service and general information network with mobile communication technique and satellite communication system.

  18. A replacement LH2 recirculation line before installation in Discovery

    Science.gov (United States)

    1999-01-01

    A spare four-inch diameter LH2 recirculation line (shown in photo) will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about =-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.

  19. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  20. Refrigerant lines in split-type air conditioners

    Energy Technology Data Exchange (ETDEWEB)

    Rettenberger, P

    1979-01-01

    Condensator and evaporating units of split-type air conditioners are evaluated and filled with the refrigerant by the producer. The line systems are hermetically closed and prevent the loss of refrigerant and the penetration of moisture or dirt. The best installation method is the 'bendable lines'. They combine flexibility and easy installation with the advantages of the copper pipe. Several ducting systems and their connecting elements like couplings and valves are described, their installation is explained. These flexible systems are especially suitable for small air-condition plants of the split-type the evaporating unit of which is portable and can put where it is desired.

  1. NBS-LANL RTM injector installation

    International Nuclear Information System (INIS)

    Wilson, M.A.; Ayres, R.L.; Cutler, R.I.; Lindstrom, E.R.; Martin, E.R.; Mohr, D.L.; Penner, S.; Yoder, N.R.; Young, L.M.

    1983-01-01

    The injector for the NBS-LANL CW racetrack microtron consists of a 100 KeV electron gun and beam transport line followed by a 5 MeV linac. The function of the gun and transport line, which have been installed at NBS, is to provide a chopped and bunched 100 KeV and up to 0.67 mA dc or pulsed beam of very low transverse emittance for matched insertion into the linac. In this paper the authors present both the design and construction details of the 100 KeV system and the results of preliminary beam tests. The tests conducted thus far show the gun and transport system to be performing well within design specifications

  2. Environmental assessment [of nuclear installations

    International Nuclear Information System (INIS)

    Townsley, M.

    1989-01-01

    The European Community has introduced a directive which instructs that for all projects likely to have a significant effect on the environment consent should only be given after a rigorous assessment of such effects has been carried out and presented as an environmental statement. Projects requiring environmental assessment include nuclear power stations, any thermal power station over 300MW, any radioactive waste storage or disposal facility, any installation which produces electricity, power lines, installations for fuel production, fuel reprocessing, radioactive waste processing and fuel enrichment. The statement must include a description of the likely effects, direct and indirect, on the environment of the development, with reference to human beings, flora, fauna, soil, water, air, climate, landscape, interactions of two or more of these, material assets and cultural heritage. Measures to avoid or remedy the impact must be included. (U.K.)

  3. Physical installation of Pelletron and electron cooling system

    International Nuclear Information System (INIS)

    Hurh, P.

    1997-01-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here

  4. Amdel on-line analyser at Rooiberg Tin Limited

    International Nuclear Information System (INIS)

    Owen, T.V.

    1987-01-01

    An Amdel on line analysis system was installed on the 'A' mine tin flotation plant at Rooiberg in April 1984. The motivation for the installation was made on account of the large variations in the feed grade to the plant and the resulting need for rapid operational adjustments to control concentrate grades thereby maximising the financial returns. An 'on-line' analyser system presented itself as a suitable alternative to the existing control method of smaller laboratory x-ray fluorescence analysers. On the system as installed at Rooiberg, two probes were fitted in each analysis zone, viz a density probe using high energy gamma radiation from a Cesium 127 source and a specific element absorption probe using low energy gamma radiation from a Americium 241 source. The signals as received from the probes are fed to a line receiver unit in the control room where a micro computer is doing the processing and prints out the information as required. Several advantages of this type of installation were gained at Rooiberg Tin Limited

  5. 49 CFR 192.377 - Service lines: Copper.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Service lines: Copper. 192.377 Section 192.377 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... § 192.377 Service lines: Copper. Each copper service line installed within a building must be protected...

  6. Ultrasonic data acquisition installation for basis and in-service testing of nuclear pressure vessels

    International Nuclear Information System (INIS)

    Gutmann, G.; Engl, G.

    1976-01-01

    The safety of nuclear installations requires continuous safety inspections during construction and operation. Essential parts of this safety inspection are the basis and in-line inspections. For this purpose installation systems are used which allow an optimal statement to be made regarding the conditions of tested components

  7. Mechanical design of injection line for VEC

    International Nuclear Information System (INIS)

    Nandi, C.; Bandopadhyay, D.K.; Pal, G.; Sharma, R.N.; Mallik, C.; Chaudhuri, J.; Bhandari, R.K.

    2003-01-01

    A 14.5 GHz ECR ion source along with its analyzing section was earlier installed at VECC for injecting multiply charged gaseous and metallic ions into the existing K 130 cyclotron. The injection line from this ECR ion source was connected to the vertical section of the existing injection line for integrating it with the K 130 cyclotron. The injection line comprises two solenoid magnets, a steering magnet, and a bending magnet. In between the solenoid magnets a length about 1.5 metres has been provided for future atomic physics experimental applications. Two gate valves are used to isolate this area. For beam diagnostics, two Faraday cups, designed and fabricated in this centre, have been installed

  8. 49 CFR 192.375 - Service lines: Plastic.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Service lines: Plastic. 192.375 Section 192.375... § 192.375 Service lines: Plastic. (a) Each plastic service line outside a building must be installed... terminate above ground level and outside the building, if— (i) The above ground level part of the plastic...

  9. Water and power installation for Lanzarote (Canary Islands) Spain

    Energy Technology Data Exchange (ETDEWEB)

    Krebs, F.

    1977-03-01

    Water producing and electrical generating facilities had to be increased on the Spanish Canary Island of Lanzarote for it to develop beyond its 1972 status. The Ministry of Public Works, prepared specifications for a turnkey installation of two 2500 M/sup 3//D desalting plants and a 5 MW (net) generating system. In 1973 through international competition Babcock and Wilcox, Espanola won a contract to build the installation. In December 1975 the construction of the project was completed. In early January 1976 the first line was producing 103% of the rated production at a thermal efficiency of 120% of the rated value. The second line was modified to operate at a reduced maximum brine temperature and commissioned. This plant was brought to full production which was 115% of the rated production in 2/sup 1///sub 2/ days. Problems and delays during the commissioning, were minimal. A 5 days performance test of the installation was run. During this test the water production was 111/sup 1///sub 2/% of the rated value at a specific energy consumption of 93% of the rated value while the maximum brine temperature was maintained 6/sup 0/C less than the design value. The high performances were achieved because the plants were well designed and built and properly commissioned. During the first 4/sup 1///sub 2/ months that the owner operated the installation it provided water and power as demanded. During that time the average plant production was 107% of the rated capacity.

  10. Installation of deep water sub-sea equipment

    Energy Technology Data Exchange (ETDEWEB)

    Pollack, Jack; Demian, Nabil [SBM-IMODCO Inc., Houston, TX (UNited States)

    2004-07-01

    Offshore oil developments are being planned in water depths exceeding 2000 m. Lowering and positioning large, heavy sub sea hardware, using conventional methods, presents new technical challenges in these ultra deep waters. In 3000 m a safe lift using conventional steel cables will require more capacity to support the cable self weight than the static payload. Adding dynamic loads caused by the motions of the surface vessel can quickly cause the safe capacity of the wire to be exceeded. Synthetic ropes now exist to greatly reduce the lowering line weight. The lower stiffness of these synthetic ropes aggravate the dynamic line tensions due to vessel motions and relatively little is known about the interaction of these ropes on the winches and sheaves required for pay-out and haul-in of these lines under dynamic load. Usage of conventional winches would damage the synthetic rope and risk the hardware being deployed. Reliable and economic installation systems that can operate from existing installation vessels are considered vital for ultra deep-water oil development. The paper describes a Deep Water Sub-Sea Hardware Deployment system consisting of a buoy with variable, pressure-balanced buoyancy, which is used to offset most of the payload weight as it is lowered. The buoyant capacity is controlled by air pumped into the tank from the surface vessel through a reinforced hose. The buoy and payload motion are isolated from the deployment line surface dynamics using a simple passive heave compensator mounted between the buoy and the bottom of the deployment rope. The system components, functionality and dynamic behavior are presented in the paper. (author)

  11. The insitu lining of cooling water piping

    International Nuclear Information System (INIS)

    Vaughan, W.K.; Oxner, K.B.

    1994-01-01

    The internal corrosion of cooling water piping as well as other industrial piping is becoming an increasing problem to system reliability. There are various alternatives being offered as solutions to the problem including water treatment, coatings, and piping replacement. The in-place lining of these pipes is becoming increasingly popular as a cost-effective method to control corrosion. A cured-in-place plastic composite system can be installed with minimal dismantling or excavation. This paper will examine case histories of the installations of this lining system in power plants at three (3) locations in the United States and one in France. It will also summarize testing that has been performed on the lining system and tests that are currently being performed

  12. Seal of quality for planners of geothermal energy installations, prize for geothermal installations; Guetesiegel fuer Planer von Geothermieanlagen, Geothermiepreis Phase I (2002)

    Energy Technology Data Exchange (ETDEWEB)

    Eugster, W. J. [Polydynamics Engineering Zuerich, Zuerich (Switzerland); Eberhard, M. [Eberhard and Partner AG, Aarau (Switzerland); Koschenz, M. [EMPA, Duebendorf (Switzerland); Morath, M. [Lippuner and Partner AG, Grabs (Switzerland); Rohner, E. [Engeo AG, Arnegg (Switzerland)

    2003-07-01

    This final report for the Swiss Federal Office for Energy describes a project that aimed to improve the awareness of planners and installers involved in geothermal energy projects for the problems encountered when dimensioning both large and small geothermal installations, and to provide the basic knowledge necessary for a correct sizing of such plants. The report's main emphasis is placed on three types of geothermal plant, bore-hole heat exchangers, groundwater use and energy pile installations. The concept of the training programme involved is described, which is to issue certificates and labels for the attainment of three levels of ability. These three levels (Labels A, B and C) cover simple, small plants for heating operation, medium sized plants within a heating capacity range of 30 to approximately 100 kW and large plants for heating and cooling operation with heat capacities greater than 100 kW, respectively. The report also includes details of the time-line aimed for and costs. Also, the idea of an annual prize for geothermal installations is briefly discussed.

  13. SAF line powder operations

    International Nuclear Information System (INIS)

    Frederickson, J.R.; Horgos, R.M.

    1983-10-01

    An automated nuclear fuel fabrication line is being designed for installation in the Fuels and Materials Examination Facility (FMEF) near Richland, Washington. The fabrication line will consist of seven major process systems: Receiving and Powder Preparation; Powder Conditioning; Pressing and Boat Loading; Debinding, Sintering, and Property Adjustment; Boat Transport; Pellet Inspection and Finishing; and Pin Operations. Fuel powder processing through pellet pressing will be discussed in this paper

  14. Improving Quality and Occupational Safety on Automated Casting Lines

    Directory of Open Access Journals (Sweden)

    Kukla S.

    2017-09-01

    Full Text Available The paper presents a practical example of improving quality and occupational safety on automated casting lines. Working conditions on the line of box moulding with horizontal mould split were analysed due to low degree of automation at the stage of cores or filters installation as well as spheroidizing mortar dosing. A simulation analysis was carried out, which was related to the grounds of introducing an automatic mortar dispenser to the mould. To carry out the research, a simulation model of a line in universal Arena software for modelling and simulation of manufacturing systems by Rockwell Software Inc. was created. A simulation experiment was carried out on a model in order to determine basic parameters of the working system. Organization and working conditions in other sections of the line were also analysed, paying particular attention to quality, ergonomics and occupational safety. Ergonomics analysis was carried out on manual cores installation workplace and filters installation workplace, and changes to these workplaces were suggested in order to eliminate actions being unnecessary and onerous for employees.

  15. Development and installation of a new on-line plant safety monitoring system for the Paks VVER-440 units

    International Nuclear Information System (INIS)

    Vegh, J.; Major, C.; Buerger, L.; Lipcsei, S.; Horvath, C.; Kapocs, G.; Eiler, J.; Hornaes, A.; Hulsund, J.E.

    2000-01-01

    The paper describes the architecture, modules, algorithms and human-machine interface of a new operator support system (OSS), which is integrated into the new, reconstructed Paks NPP plant computers. The main task of the new OSS is to perform continuous plant safety monitoring and assessment, it has the following basic functions: on-line evaluation and presentation of critical safety function (CSF) status trees, continuous evaluation and presentation of the actual safety status of the plant, displaying and browsing the new symptom-oriented EOPs, automatic displaying of those process signals which are quoted in the EOPs. The first version of the new operator support system was connected to the Paks NPP full scope simulator in October 1999. This configuration was later successfully applied for the simulator testing of the new symptom-oriented EOP set for the Paks NPP in November 1999. The installation process was continued in 2000: the new system started its operation on Unit 2 (June) and on Unit 1 (August), together with the reconstructed, new PCS. (author)

  16. End of the line to build a circle

    CERN Multimedia

    2006-01-01

    The installation of the cryogenic distribution line in the LHC tunnel is finally finished! All the sectors have undergone pressure and helium leak tests at room temperature, and one complete sector was cold tested in cryogenic conditions. Some of the QRL team in UJ22 of the LHC tunnel, where the last sector of the cryogenic distribution line was installed.It must have been a joyous moment in UJ22 of the LHC tunnel (near Point 2, Saint Genis Pouilly) on 19 October. This was where the last external weld of the cryogenic distribution line, also known as QRL, was made, thus completing the full distribution ring. The QRL is a circle built in 8 sectors, each approximately 3 km in length. It will circulate helium in liquid and gas phases, at different temperatures and pressures, to provide the cryogenic conditions for the superconducting magnets in the LHC tunnel. The last sector installed (sector 1-2) passed the pressure and helium leak tests at room temperature on 28 October. As part of the warm test, each sector...

  17. 14 CFR 23.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 23.993... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components § 23.993 Fuel system lines and fittings. (a) Each fuel line must be installed...

  18. 14 CFR 25.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System Components § 25.993 Fuel system lines and fittings. (a) Each fuel line must be installed and supported to prevent excessive... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 25.993...

  19. 14 CFR 27.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System Components § 27.993 Fuel system lines and fittings. (a) Each fuel line must be installed and supported to prevent excessive... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 27.993...

  20. 14 CFR 29.993 - Fuel system lines and fittings.

    Science.gov (United States)

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System Components § 29.993 Fuel system lines and fittings. (a) Each fuel line must be installed and supported to prevent excessive... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system lines and fittings. 29.993...

  1. Automated installation for atomic emission determination of gold, silver and platinum group metals

    International Nuclear Information System (INIS)

    Zayakina, S.B.; Anoshin, G.N.; Gerasimov, P.A.; Smirnov, A.V.

    1999-01-01

    An automated installation for the direct atomic emission determination of silver, gold and platinum-group metals (Ru) in geological and geochemical materials with software for automated data acquisition and handling is designed and developed. The installation consists of a DFS-458 diffraction spectrograph, a MAES-10 multichannel analyzer of emission spectra, and a dual-jet plasmatron. A library of spectral lines of almost all elements excited in the dual-jet plasmatron is complied [ru

  2. Broaching installation for cutting holes in a plate and broaching process

    International Nuclear Information System (INIS)

    Beraudier, D.; Douheret, J.Y.

    1995-01-01

    The installation consists of two lines of broaching with successive actions, each containing a pulling unit and an attachment having their axes of displacement aligned to follow the common work axis. The axes of work of the two broaching lines are separated by a distance at least equal to the diameter of the plate. The two pulling units and the two attachments are placed one on either side of the plate to be broached. 6 figs

  3. 49 CFR 192.719 - Transmission lines: Testing of repairs.

    Science.gov (United States)

    2010-10-01

    ... pipe before it is installed. (b) Testing of repairs made by welding. Each repair made by welding in... 49 Transportation 3 2010-10-01 2010-10-01 false Transmission lines: Testing of repairs. 192.719... Transmission lines: Testing of repairs. (a) Testing of replacement pipe. If a segment of transmission line is...

  4. Evaluation of refractory lining wear of Companhia Siderurgica Nacional (CSN) blast furnaces

    International Nuclear Information System (INIS)

    Santos, N.J. dos; Mello, A.H.B. de; Pereira, C.L.; Paula Sarkis, D. de; Martins Filho, D.I.; Banados Perez, H.E.; Carvalho, G.; Daltro, T.F.L.

    1984-01-01

    The blast furnace refractory linings are submitted to unfavourable conditions such as alkalis attack, temperature, top pressure, abrasion and so forth... After studies on distribution and installation of radioactive sources with low activities in the refractory lining, it was possible to develop a new technique of thickness evaluation and attendance of wearing in the furnace lining. The viability analysis, simulated laboratory tests, localization, identification, installations and periodical measurements of the radioactive sources are described, as well the results obtained on the present campaign of CSN Blast Furnaces. (Author) [pt

  5. Durable Residual Wall Lining (DL) Installation Concepts and Acceptability as an IRS Replacement Tool for Malaria Vector Control

    DEFF Research Database (Denmark)

    Larsen, Marie Louise; Lenau, Torben Anker

    that will eliminate the need for repeated spraying of walls over a period of 3-4 years after installation. The objective of this project was to evaluate a variety of methods for attaching DL to various wall surfaces found in traditional, rural African housing. Assessments were made as to strength of attachment under...... various stresses and appearance after installation. The experiments took place in Anwona village near Obuasi, Ghana with the support and cooperation of AngloGold Ashanti’s Malaria Control Center. 55 mechanical and adhesive products were tested for their ability to hold a static load (simulating long...... observations were included in the DL Installation Manual, the final delivery of this project....

  6. Fast polarizers installation for ECRH and ECE in TCV

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Miguel, E-mail: miguel.silva@epfl.ch [Ecole Polytechnique Federale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas (CRPP), Association EURATOM-Confederation Suisse, CH-1015 Lausanne (Switzerland); Goodman, Timothy; Felici, Federico; Porte, Laurie [Ecole Polytechnique Federale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas (CRPP), Association EURATOM-Confederation Suisse, CH-1015 Lausanne (Switzerland)

    2011-10-15

    We report on the installation of fast polarizers for ECRH injection and ECE diagnostics, in the TCV tokamak. The main goal is to change the polarization during a plasma shot and react to changing conditions such as: plasma current and position, ECRH injection angles as well as ECE oblique observation angle and correlation ECE frequency. This will allow tracking of plasma variations, find optimum parameters to maximize ECRH absorption and improve the quality and consistency of ECE measurements. The polarization is varied using two fast polarizers, from General Atomics, positioned either in the evacuated transmission line for ECRH, or in a similar non-evacuated line near a real-time moveable directional antenna for ECE. A programmable driver is used to control a servo-motor and allows three operation modes during a plasma shot: fixed angle position, pre-programmed reference waveform and following of a real-time reference waveform. Preliminary tests of the motor controller achieved an 8 Hz bandwidth for a {+-}4{sup o} amplitude motion and a 2.2 Hz bandwidth for a {+-}4{sup o} amplitude motion. The fast polarizers are presently in the ECE system and the control hardware is being installed.

  7. Status of ACCULINNA beam line

    CERN Document Server

    Rodin, A M; Bogdanov, D D; Golovkov, M S; Fomichev, A S; Sidorchuk, S I; Slepnev, R S; Wolski, R; Ter-Akopian, G M; Oganessian, Yu T; Yukhimchuk, A A; Perevozchikov, V V; Vinogradov, Yu I; Grishenchkin, S K; Demin, A M; Zlatoustovskii, S V; Kuryakin, A V; Filchagin, S V; Ilkaev, R I

    2003-01-01

    The separator ACCULINNA was upgraded to achieve new experimental requirements. The beam line was extended by new ion-optical elements beyond the cyclotron hall. The new arrangements yield much better background conditions. The intensities of sup 6 He and sup 8 He radioactive beams produced in fragmentation of 35 A MeV sup 1 sup 1 B ions were increased up to a factor of 10. The upgraded beam line was used in experiments to study the sup 5 H resonance states populated in the t+t reaction. A cryogenic liquid tritium target was designed and installed at the separator beam line.

  8. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  9. BEAM EXTRACTION FROM THE RECYCLER RING TO P1 LINE AT FERMILAB

    Energy Technology Data Exchange (ETDEWEB)

    Xiao, M. [Fermilab; Capista, D. [Fermilab; Adams, P. [Fermilab; Morris, D. [Fermilab; Yang, M. J. [Fermilab; Hazewood, K. [Fermilab

    2016-10-03

    The transfer line for beam extraction from the Recycler ring to P1 line provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. It was designed in 2012. The kicker magnets at RR520 and the lambertson magnet at RR522 in the RR were installed in 2014 Summer Shutdown, the elements of RR to P1 Stub (permanent quads, trim quads, correctors, BPMs, the toroid at 703 and vertical bending dipole at V703 (ADCW) were installed in 2015 Summer Shutdown. On Tuesday, June 21, 2016, beam line from the Recycler Ring to P1 line was commissioned. The detailed results will be presented in this report.

  10. Basic electrical installation work level 2

    CERN Document Server

    Linsley, Trevor

    2015-01-01

    Everything needed to pass the first part of the City & Guilds 2365 Diploma in Electrical InstallationsUpdated in line with the 3rd Amendment of the 17th Edition IET Wiring Regulations, this new edition covers the City & Guilds 2365-02 course. Written in an accessible style with a chapter dedicated to each unit of the syllabus, this book helps you to master each topic before moving on to the next. End of chapter revision questions enable learners to check their understanding and consolidate key concepts learnt in each chapter. With a companion website containing videos, animations, worksheets a

  11. 49 CFR 192.373 - Service lines: Cast iron and ductile iron.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Service lines: Cast iron and ductile iron. 192.373... Regulators, and Service Lines § 192.373 Service lines: Cast iron and ductile iron. (a) Cast or ductile iron... cast iron pipe or ductile iron pipe is installed for use as a service line, the part of the service...

  12. 40 CFR 63.4568 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... direction indicator must be installed in each bypass line or air makeup supply line that could divert the... via relative accuracy testing. (vi) Perform leak checks monthly. (vii) Perform visual inspections of... accuracy of at least 0.5 inches of water column or 5 percent of the measured value, whichever is larger...

  13. TIGER/Line Shapefile, 2016, nation, U.S., Military Installation National Shapefile

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  14. TIGER/Line Shapefile, 2015, nation, U.S., Military Installation National Shapefile

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  15. TIGER/Line Shapefile, 2017, nation, U.S., Military Installation National Shapefile

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  16. Management of procurement activities in a nuclear installation

    International Nuclear Information System (INIS)

    1996-12-01

    Discussions held within the framework of IAEA regional technical co-operation projects implemented in the Latin America, Asia-Pacific and eastern Europe regions revealed an area of frequent difficulties related to the proper control, by the management of nuclear utilities, of the effective fulfilment of contractual quality and safety requirements. Evaluation of the results of a number of OSART missions has also pointed to a need for improving the control that some utilities exercise on their suppliers. The IAEA was thus prompted to initiate the development of a technical document providing guidance on these subjects. In October 1995, a consultants meeting was convened to determine the target users of the technical document and to develop the scope, contents, structure and the reference material. A first draft was then prepared. An Advisory Group meeting consisting of experts from 17 Members States was held in Vienna in May 1996 to review and complete the draft. The technical document is intended to provide practical guidance on controlling procurement, with supporting information for senior management, line managers and line supervisors in a nuclear installation. Although the guidance is structured to address the needs during the operating stage of a nuclear power plant, much of the material is also applicable to the construction and decommissioning stages and to other nuclear installations. 1 fig

  17. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  18. Monobuoy monitoring system - project, installation and preliminary results; Sistema de monitoracao de monoboias maritimas - desenvolvimento, instalacao e analise preliminar de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Daniel L; Machado Filho, Remo Z [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Medeiros, Junior, Adory J [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    A monobuoy monitoring system was developed and installed on 2004 in two oil terminals of TRANSPETRO. The main purpose of this system is to assure that monobuoys will be assisted during offloading operations, which will reduce the risk of accidents and detect immediately damages on mooring lines and equipment. The system comprises a Control Module on terminal site and a Remote Monitoring Unit, installed on each monobuoy. The link between modules is provided by an UHF radio-modem. The parameters acquired are pitch, roll, heave, geographic position, internal variables, and, if available, pressure and temperature of lines, traction on mooring system, etc. Positioning information is processed by the PETRONAV Positioning System. The whole process is registered and monitored on terminal with graphical interface. This article describes the development and installation of the system and the preliminary analysis of data produced since the system was installed. (author)

  19. Conceptual design and development of a superconducting bus-line for the Large Helical Device

    International Nuclear Information System (INIS)

    Mito, T.; Takahata, K.; Yamada, S.; Yamamoto, J.; Uede, T.; Ikeda, M.

    1993-01-01

    A superconducting bus-line is proposed and preliminarily tested as an electrical feeder between the superconducting coils of the Large Helical Device (LHD) and their electrical power supply. The bus-line consists of a superconductor and its cryogenic transfer-line. The superconductor is a specially developed aluminum stabilized NbTi wire, which is installed in the innermost channel of the transfer-line. The vacuum insulated transfer-line consists of four corrugated tubes assembled coaxially. Liquid helium flows through the innermost channel and shield gas flows through another annular channel in the line. We are completing the conceptual design of the bus-line and the installation plan for the LHD experimental hall and are carrying out development of wires, including an investigation of their mechanical properties and electrical insulation. This report describes the conceptual design of the superconducting bus-line for the LHD, and the results we obtained recently during the design and development of a full-scale demonstration facility. (orig.)

  20. Analytical techniques for in-line/on-line monitoring of uranium and plutonium in process solutions : a brief literature survey

    International Nuclear Information System (INIS)

    Marathe, S.G.; Sood, D.D.

    1991-01-01

    In-line/on-line monitoring of various parameters such as uranium-plutonium-fission product concentration, acidity, density etc. plays an important role in quickly understanding the efficiency of processes in a reprocessing plant. Efforts in studying and installation of such analytical instruments are going on since more than three decades with adaptation of newer methods and technologies. A review on the developement of in-line analytical instrumentation was carried out in this laboratory about two decades ago. This report presents a very short literature survey of the work in the last two decades. The report includes an outline of principles of the main techniques employed in the in-line/on-line monitoring. (author). 77 refs., 6 tabs

  1. Statistical Model Checking for Product Lines

    DEFF Research Database (Denmark)

    ter Beek, Maurice H.; Legay, Axel; Lluch Lafuente, Alberto

    2016-01-01

    average cost of products (in terms of the attributes of the products’ features) and the probability of features to be (un)installed at runtime. The product lines must be modelled in QFLan, which extends the probabilistic feature-oriented language PFLan with novel quantitative constraints among features...

  2. Government response to the consultation on proposals relating to the decommissioning of offshore energy installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-11-09

    This document presents the UK government's response to consultation concerning decommissioning offshore oil and gas installations and pipelines and offshore renewable energy installations and associated power lines. The key issues discussed cover provision of funds for decommissioning, safeguarding the funds in event of insolvency, and widening the categories of people on whom decommissioning obligations can be placed in addition to earlier issue of notices and provision of decommissioning security, and extending the power of the Secretary of State to require information.

  3. Elaboration and installation of technology of on-line diagnostics of important equipment damage as a procedure of NPP lifetime management

    International Nuclear Information System (INIS)

    Bakirov, M.; Povarov, V.

    2012-01-01

    In contrast to conventional approaches used for diagnostics (i.e. when inspection results are used as data for numerical calculative strength analysis) the specific feature of the new proposed approach consists in a fact that the approach is based on application of the 'inverse problem' principle. As regards to implementation of the proposed new approach, first of all a detailed numerical calculative finite-element model of the monitored equipment must be developed. Results of preliminary calculations allow to make reasonable selection of definite installation places and types of control sensors intended for more effective and precise work of the calculative model. As a rule, the control sensors are high-temperature strain gauges, temperature probes, pressure, acceleration and displacement sensors, as well as acoustic-emission and ultrasonic sensors used for monitoring of actual defectiveness kinetics in the zone of potential damaging. All the sensors work in the on-line mode during several years of operation, the optimal frequency of data records is selected, all recorded data after prompt processing are transferred to the finite-element calculative modulus for strength calculations of a monitored zone. Software for strength calculation must be based on an individual calculative code, since it should also work in the on-line mode. Comprehensible strength analysis in conjunction with obtained results of defectiveness kinetics monitoring allow not only to foresee the most unfavorable scenario resulting to damaging, but also to have a possibility for prompt analysis and elaboration of compensating measures allowing to reduce operational loadings. In the report the results of development and practical application of the new approach at NPPs and corresponding technology are presented. (author)

  4. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  5. 29 CFR 1926.955 - Overhead lines.

    Science.gov (United States)

    2010-07-01

    ... installing or removing wire or cable, strains to which poles and structures will be subjected shall be... being strung in or removed shall be kept under positive control by the use of adequate tension reels... adjacent to energized lines the tension stringing method or other methods which preclude unintentional...

  6. Ground-based transmission line conductor motion sensor

    International Nuclear Information System (INIS)

    Jacobs, M.L.; Milano, U.

    1988-01-01

    A ground-based-conductor motion-sensing apparatus is provided for remotely sensing movement of electric-power transmission lines, particularly as would occur during the wind-induced condition known as galloping. The apparatus is comprised of a motion sensor and signal-generating means which are placed underneath a transmission line and will sense changes in the electric field around the line due to excessive line motion. The detector then signals a remote station when a conditioning of galloping is sensed. The apparatus of the present invention is advantageous over the line-mounted sensors of the prior art in that it is easier and less hazardous to install. The system can also be modified so that a signal will only be given when particular conditions, such as specific temperature range, large-amplitude line motion, or excessive duration of the line motion, are occurring

  7. Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation

    Science.gov (United States)

    Razak, K. Abdul; Othman, M. I. H.; Mat Yusuf, S.; Fuad, M. F. I. Ahmad; yahaya, Effah

    2018-05-01

    Oil and gas today being developed at different water depth characterized as shallow, deep and ultra-deep waters. Among the major components involved during the offshore installation is pipelines. Pipelines are a transportation method of material through a pipe. In oil and gas industry, pipeline come from a bunch of line pipe that welded together to become a long pipeline and can be divided into two which is gas pipeline and oil pipeline. In order to perform pipeline installation, we need pipe laying barge or pipe laying vessel. However, pipe laying vessel can be divided into two types: S-lay vessel and J-lay vessel. The function of pipe lay vessel is not only to perform pipeline installation. It also performed installation of umbilical or electrical cables. In the simple words, pipe lay vessel is performing the installation of subsea in all the connecting infrastructures. Besides that, the installation processes of pipelines require special focus to make the installation succeed. For instance, the heavy pipelines may exceed the lay vessel’s tension capacities in certain kind of water depth. Pipeline have their own characteristic and we can group it or differentiate it by certain parameters such as grade of material, type of material, size of diameter, size of wall thickness and the strength. For instances, wall thickness parameter studies indicate that if use the higher steel grade of the pipelines will have a significant contribution in pipeline wall thickness reduction. When running the process of pipe lay, water depth is the most critical thing that we need to monitor and concern about because of course we cannot control the water depth but we can control the characteristic of the pipe like apply line pipe that have wall thickness suitable with current water depth in order to avoid failure during the installation. This research will analyse whether the pipeline parameter meet the requirements limit and minimum yield stress. It will overlook to simulate pipe

  8. Reduction of the visual impact of overhead transmission line systems through utilisation of line surge arresters as lightning protection

    DEFF Research Database (Denmark)

    Sørensen, Thomas Kjærsgaard; Holbøll, Joachim

    2008-01-01

    with the Technical University of Denmark, on how to lessen the visual impact of 400 kV overhead line transmission systems. In this paper omission of shield wires combined with installation of a suitable number of line surge arresters is investigated as a possible alternative to transmission lines equipped...... with shielding wires thereby reducing tower height, allowing more compact designs of towers thus minimizing the visual environment impact of the lines. Omission of shield wires in the system and instead utilizing a larger number of surge arresters in the (upper) phases of an overhead line without reduction...... will be investigated by transient simulations on a 400 kV line with either shield wires or line surge arresters. These simulations will also be used to estimate number and location of the line surge arresters in the line to ensure a satisfactory performance of the line when omitting shield wires in the tower top...

  9. This picture was taken in 1967 during the first test of the Isotope On-Line Separator (ISOLDE) installation at the 600 MeV CERN Synchro Cyclotron.

    CERN Multimedia

    CERN PhotoLab

    1967-01-01

    When ISOLDE began operation, it was unique in the world. It used a new technique to overcome the problem of rapidly separating interesting atoms from the rest of the nuclear target. Through a combination of chemical and electromagnetic methods the different isotopes were separated and converted into an ion beam made of just one isotope. On-line production of radioactive nuclei, in this way, offered many new opportunities for physicists as it allowed them to perform previously impossible experiments on short-lived nuclei. ISOLDE has become one of CERN's major installations and it supports a broad scientific programme by providing beams to different experiments. The techniques developed at ISOLDE have opened up a new field of radioactive ion-beam accelerators, both at CERN and worldwide.

  10. Organic lining materials test in flue gas ducts

    International Nuclear Information System (INIS)

    Raveh, R.; Sfez, D.; Johannsson, L.

    1998-01-01

    Corrosion protection solutions are being widely used in electric power plants equipped with Flue Gas Desulfurization (FGD) systems. Organic lining materials are one of many solutions available on the market for corrosion protection. This market segment is found in a continuous development in order to fulfill the severe demands of these materials. The main goal of this test is to obtain information about the high temperature resistance of the materials as occurs when the FGD system is by-passed. Aster initial investigation of this market segment only a few lining materials were found compatible according to their manufacturer data. Seven of these materials were installed in the outlet flue gas duct of the Israeli power station M.D. B. This power station is not equipped with a FGD system, thus it gives a real simulation of the environmental conditions into which the lining material is subjected when the FGD system is by-passed. The materials installation was observed carefully and performed by representatives from the manufacturers in order to avoid material failure due to a non-adequate application. The power station was shut down and the lining materials were inspected three and a half months after the lining materials were applied. The inspection results were good and besides changes in the lining color, most materials did not show any damages. During that time the flue gas temperature at the duct was 134?C except some temperature fluctuations

  11. The worksite for the tram-line reaches CERN

    CERN Document Server

    2009-01-01

    The civil-engineering work for the tram-line outside CERN starts on 16 February. The zones affected by the work. The darkest line represents the part of the road where the work will be carried out between March and July 2009.The worksite for the section of tram-line between Meyrin-Village and CERN is entering a new phase. The contractors are to begin by upgrading the underground pipelines to comply with the installation requirements for the tramline track. The next stage will be to install the track itself, which will entail a complete reconstruction of the roadway. In the coming weeks a roundabout will be created in front of Gate A, which will allow CERN personnel travelling towards Saint-Genis-Pouilly to exit via Gate A rather than having to use the car park where the flags are as a thoroughfare. Once the roundabout is complete, it is planned to prohibit direct access to the Route de Meyrin at Gate B via this car park to all traffic ...

  12. Delivery and installation of PC/FRAM at the PNC Tokai Works

    International Nuclear Information System (INIS)

    Sampson, T.E.; Kelley, T.A.; Kroncke, K.E.; Menlove, H.O.; Baca, J.; Asano, Takashi; Terakado, Shigeru; Goto, Yasushi; Kogawa, Noboru

    1997-11-01

    The authors report on the assembly, testing, delivery, installation, and initial testing of three PC/FRAM plutonium isotopic analysis systems at the Power Reactor and Nuclear Fuel Development Corporation's Tokai Works. These systems are intended to measure the isotopic composition and 235 U/plutonium of mixed oxide (MOX) waste in 200-L waste drums. These systems provide capability for performing measurements on lead-lined drums

  13. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  14. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  15. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  16. An automatic system for controlling the quality of straws installed in the ATLAS TRT detector

    CERN Document Server

    Golunov, A O; Gousakov, Yu V; Kekelidze, G D; Livinski, V V; Mouraviev, S V; Parzycki, S S; Peshekhonov, V D; Price, M J; Savenkov, A A

    2004-01-01

    This article describes an automatic system to control the quality of straws installed in the wheels of the end-cap Transition Radiation Tracker of the ATLAS experiment. The system tests both the straightness and the electrical insulation of the straws during installation. The testing time per straw is 9s; consequently it takes about 2h to measure one layer of straws. The off-line analysis takes 20s per straw. With this system defects can be immediately detected and corrected. This clearly influences the future performance of the detector.

  17. Installation, testing and first results of TEXTOR's new ICRH system

    International Nuclear Information System (INIS)

    Durodie, F.; Delvigne, T.; Descamps, P.; Koch, R.; Ongena, J.; Vandenplas, P.E.; Van Nieuwenhove, R.; Van Oost, G.; Weynants, R.R.; Shen, X.M.; Ecole Royale Militaire, Brussels; Messiaen, A.M.; Ecole Royale Militaire, Brussels; Huetteman, P.; Kohlhaas, W.; Stickelman, C.; Cosler, A.

    1989-01-01

    The new ICRH system for TEXTOR, presented at the previous SOFT conference, has been tested and installed during spring and summer of 1987. Pulses of up to 2.8 MW have been achieved representing a power density at the antenna of about 3.1 MW/m 2 and over 90% of the installed RF power. Taking into account the already achieved volttages in the system one could extrapolate that a power density of 10 MW/m 2 with an transmission efficiency well over 90% would be technically feasible. First results, such as the interesting property that, in contrast with other experiments, the two antennae in each pair operate with zero and with π phase difference with nearly the same coupling efficiency, are discussed. The testing and conditioning procedures are described. RF-leak problems encounterd at the behinning of the experimental phase are discussed. Antenna and transmission line diagnostics as well as related tuning procedures are also described. During the installation of the neutral beam injectors, from beginning of April to about end of August 1988, several modifications to the whole of the ICRH system are being implemented. (author). 5 refs.; 6 figs.; 1 tab

  18. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  19. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  20. Conceptual design report for the project to install leak detection in FAST-FT-534/548/549

    Energy Technology Data Exchange (ETDEWEB)

    Galloway, K.J.

    1992-07-01

    This report provides conceptual designs and design recommendations for installing secondary containment and leak detection systems for three sumps at the Fluorinel and Storage Facility (FAST), CPP-666. The FAST facility is located at the Idaho Chemical Processing Plant (ICPP) at the Idaho National Engineering Laboratory (INEL). The three sumps receive various materials from the FAST water treatment process. This project involves sump upgrades to meet appropriate environmental requirements. The steps include: providing sump modifications or designs for the installation of leak chases and/or leakage accumulation, coating the sump concrete with a chemical resistant sealant (except for sump VES-FT-534 which is already lined with stainless steel) to act as secondary containment, lining the sumps with a primary containment system, and providing a means to detect and remove primary containment leakage that may occur.

  1. Conceptual design report for the project to install leak detection in FAST-FT-534/548/549

    International Nuclear Information System (INIS)

    Galloway, K.J.

    1992-07-01

    This report provides conceptual designs and design recommendations for installing secondary containment and leak detection systems for three sumps at the Fluorinel and Storage Facility (FAST), CPP-666. The FAST facility is located at the Idaho Chemical Processing Plant (ICPP) at the Idaho National Engineering Laboratory (INEL). The three sumps receive various materials from the FAST water treatment process. This project involves sump upgrades to meet appropriate environmental requirements. The steps include: providing sump modifications or designs for the installation of leak chases and/or leakage accumulation, coating the sump concrete with a chemical resistant sealant (except for sump VES-FT-534 which is already lined with stainless steel) to act as secondary containment, lining the sumps with a primary containment system, and providing a means to detect and remove primary containment leakage that may occur

  2. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  3. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  4. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  5. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  6. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  7. The various lines followed in the world

    International Nuclear Information System (INIS)

    Pierre, C.

    1975-01-01

    If the imaginable lines can be counted in hundreds, at least ten of them have effectively contributed to the production of energy and among them the LWR line (reactors cooled and moderated with ordinary water) represent 3/4 of the installed power and an even greater proportion of orders for nuclear power stations. The problems of fissile material supply will undoubtly make it imperative to have massive recourse to fast reactors, superregenerating reactors that produce more fissile material than they consume. Thanks to their special characteristics, high temperature reactors should also play a part. These three lines have, moreover, the advantage of being to a great extent complementary [fr

  8. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  9. Preliminary installment of total picture archiving and communication systems

    International Nuclear Information System (INIS)

    Takenaka, E.; Takanashi, S.; Suda, Y.; Furui, S.; Yoshida, H.; Hosaka, Y.; Fukui, T.

    1990-01-01

    This paper studied the image quality of various medical digital images and to install a small but total image management and communication system to file images. The system consists of a filing system with a laser scanning digitizer (2,000 x 2,000 x 8 bits), an optical disk (3.8 GB), two HD CRTs, and a 1.6 GB magnetic disk. This system can file on-line the images from a second filing system with FCR (on-line) and a Konica direct imaging system during treatment and follow-up, a CCD TV simulator system for a remote after-loading system, a dose map on CT and MR images through a self-made treatment planning system on the PC level, a CCD TV (RGB) system for local lesions, and portal images, through the imaging plate, for brachytherapy

  10. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  11. EVALUATING DEGREE OF ACTIVE POWER LOSSES REDUCTION IN THE ELECTRIC POWER LINES WITH REACTIVE POWER COMPENSATION

    Directory of Open Access Journals (Sweden)

    V. N. Radkevich

    2016-01-01

    Full Text Available The paper considers evaluation procedure for the degree of active power losses reduction in the power transmission lines under 1 kV and 6–10 kV of the systems of electric power supply of industrial enterprises with compensating installations mounted at the side of the customer. The capacitor installations conform to the applied voltage level and factor in dielectric losses in the capacitors. The voltage at the compensating device terminal changes from 0.95 to 1.05 of the capacitors nominal voltage. The study did not account for reactive power losses in the line, nor did it for its charge capacity, conditioned by relative shortness of the cable lines generally operating in the mains of industrial enterprises. For this reason, the quantities of reactive power being consumed and generated by the transmission line are negligible and do not significantly affect the reactive power flux. The researchers obtain functional relations that allow estimating the degree of power loss reduction in the transmission line factoring in its explicit initial data. They perform mathematical analysis of the obtained functional relations and study the function by means of derivatives. The function extremum points are found as well as the intervals of its increment and decrement. A graphical research of the obtained functional relation is performed. It is ascertained that reduction of the active power losses is contingent on the line and the capacitor-installation engineering factors, the electrical energy consumer reactive load value as well as the voltage applied to the capacitor installation. The functional relations presented in the article can be employed in scoping calculation necessary for decision making on the reactive power compensation in systems of the industrial facilities electric power supply. Their account will allow a more accurate estimate of technical and economic effect of the capacitor bank installation in the electrical mains under 1 kV and 6

  12. Unevenness of Sliding Surface of Overhead Rigid Conductor Lines and Method for Reducing Unevenness

    Science.gov (United States)

    Aboshi, Mitsuo; Shimizu, Masashi

    Rigid conductor lines are used in many subways, because the use of such conductor lines reduces the risk of accidents and because less space is required for their installation. However, as the unevenness of the sliding surface of the rigid conductor lines significantly influences the fluctuations in the contact force between pantographs and contact lines, it is necessary to decrease the unevenness at the construction as well as the maintenance stages. In order to investigate the installation accuracy of overhead rigid conductor lines, we have developed a device that accurately and continuously measures the unevenness of the sliding surface. By using this measuring device, we have confirmed that the unevenness of the sliding surface depends on various factors such as the sag between the support points, the deformation of the aluminum base or the conductive rail in the case of a long wavelength, the slight sagging unevenness between the bolts of the long ear, the undulating wear etc. This paper describes the actual unevenness conditions and the technical methods for decreasing the unevenness of the sliding surface of overhead rigid conductor lines.

  13. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Hayoun, C [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  14. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  15. Groundwater quality monitoring well installation for Waste Area Groupings 8 and 9 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of nine groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 8 and two GQM wells on the perimeter of WAG 9. WAG 8 encompasses approximately 34 acres, most of which are located in Melton Valley. Irregular in shape, the site has two sinuous extensions from its northern end that contain the low-level radioactive waste (LLW) transfer lines. WAG 8 contains 22 solid waste management units (SWMUs) that can be divided into 4 groups. These groups include the High Flux Isotope Reactor/Transuranium Processing Facility waste collection basins, the LLW line leak sites, and the active LLW tanks. WAG 9 encompasses about 3 acres and is located west of the main portion of WAG 8 and south of Melton Valley Drive. WAG 9 contains four SWMUs. The wells in WAGs 8 and 9 were drilled and developed from June 1989 to March 1990. Monitoring wells were installed to characterize and assess the WAGs in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAGs 8 and 9. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  16. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  17. Start up testing for the secure automated fabrication line

    International Nuclear Information System (INIS)

    Gerber, E.W.; Benson, E.M.; Dahl, R.E.

    1987-01-01

    The secure automated fabrication (SAF) line is a remotely operated, liquid metal reactor fuel fabrication process being built by Westinghouse Hanford Company for the Department of Energy. All process and control equipment is installed and start up testing has been initiated. Start up testing is comprised of five phases, each incorporating higher degrees of equipment integration, automation, and remote control. Testing methodology for SAF line start up is described in this report

  18. An alternative to conventional babbitt metal-lined generator pads

    Energy Technology Data Exchange (ETDEWEB)

    Puuska, H. [Imatra Hydroelectric Power Plant (Finland)

    1996-08-01

    The generator refurbishment of the Imatra Hydroelectric Power Plant Unit 1 in Finland is described. The generator work called for installation of a new cooling system for the generator thrust bearing. The considerations leading to the decision to replace the conventional babbitt metal-lined pads with elastic metal-plastic coated thrust bearing pads and the installation of the new pads are outlined in the article. Results of the trial run are summarized; the end temperature of the unit was more than 20C lower than for units equipped with conventional babbitted bearings.

  19. TIGER/Line Shapefile, 2017, nation, U.S., Topological Faces-Military Installation Relationship File

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  20. TIGER/Line Shapefile, 2016, nation, U.S., Topological Faces-Military Installation Relationship File

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  1. Zenith distribution and flux of atmospheric muons measured with the 5-line ANTARES detector

    NARCIS (Netherlands)

    Aguilar, J. A.; Albert, A.; Anton, G.; Anvar, S.; Ardid, M.; Jesus, A. C. Assis; Astraatmadja, T.; Aubertg, J. -J.; Auer, R.; Baret, B.; Basa, S.; Bazzotti, M.; Berting, V.; Biagi, S.; Bigongiari, C.; Bou-Cabo, M.; Bouwhuis, M. C.; Brown, A. M.; Brunnerg, J.; Busto, J.; Camarena, F.; Capone, A.; Carminati, G.; Carr, J.; Castel, D.; Castorina, E.; Cavasinni, V.; Cecchini, S.; Charvis, Ph.; Chiarusi, T.; Circella, M.; Coniglione, R.; Costantini, H.; Cottini, N.; Coyle, P.; Curtil, C.; De Bonis, G.; Decowski, M. P.; Dekeyser, I.; Deschamps, A.; Distefano, C.; Donzaud, C.; Dornic, D.; Drouhin, D.; Eberl, T.; Emanuele, U.; Ernenweing, J. -P.; Kalantar-Nayestanaki, N.; Kretschmer, W.; Loehner, H.

    2010-01-01

    The ANTARES high-energy neutrino telescope is a three-dimensional array of about 900 photomultipliers distributed over 12 mooring lines installed in the Mediterranean Sea. Between February and November 2007 it acquired data in a 5-line configuration. The zenith angular distribution of the

  2. The Nuclear Installations (Excepted Matter) Regulations 1978 (Statutory Instrument No. 1779, 4 December 1978)

    International Nuclear Information System (INIS)

    1979-01-01

    These Regulations prescribe, for the purposes of the definition of 'excepted matter' in the Nuclear Installations Act 1965, certain specified quantities and forms of nuclear matter, and supersede the Nuclear Installations (excepted Matter) Regulations 1965. They bring the definition of excepted matter in those Regulations into line with the decisions of 27 October 1977 of the OECD Nuclear Energy Agency's Steering Committee excluding certain kinds and quantities of nuclear substances from the scope of the Paris Convention on Third Party Liability in the Field of Nuclear Energy. Compared with the 1965 Regulations, the principal changes in relation to consignments are that activity limits and packing requirements now take account of the most recent IAEA Regulations. (NEA) [fr

  3. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  4. UHV equipment for light line of the Laboratorio Nacional de Luz Sincrotron - LNLS

    International Nuclear Information System (INIS)

    Pacheco, J.G.; Fonseca, P.T.; Castro, A.R.B. de

    1991-01-01

    The construction of light line for spectral range from 12 to 310 eV of Laboratorio Nacional de Luz Sincrotron (LNLS) is presented. The basic parameters of light line are shown. The components of UHV constructed in the LNLS considering installation aspects and final results are exposed. (M.C.K.)

  5. Reliability studies, construction and test of a pilot cable installation with supra-conductors

    International Nuclear Information System (INIS)

    Franke, H.; Allgemeine Elektricitaets-Gesellschaft AEG Telefunken Kabelwerke A.G., Moenchengladbach; Kabel- und Metallwerke Gutehoffnungshuette A.G., Hannover; Linde A.G., Hoellriegelskreuth

    1980-01-01

    The basic knowledge of electrical insulation, of current carrying capacity of superconductors, of contraction of papers and of thermal insulation was extended. Different kinds of cable-joints were developed. Voltage tests of a testline were made. The line stands the operating voltage, the terminations must be improved to stand the test voltage. The cooling system of a larger cable installation was studied. (orig.) [de

  6. New magnet transport system for the LHC beam transfer lines

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system (pictured here in one of the tunnels) is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The lead vehicle is powered by an electric rail set into the roof of the tunnel. The system is backed up by electrical batteries that enable it to operate in the absence of an outside power source or in the event of power failure. Last but not least, for the long-distance transport of magnets, it can be optically guided by a line traced on the tunnel floor. The convoy moves through the particularly narr...

  7. Resistance to ionizing radiations of materials installed at the CERN accelerators

    International Nuclear Information System (INIS)

    Schoenbacher, H.

    1982-01-01

    All materials installed in high energy accelerators along the lines of primary and secondary beams are exposed to ionizing radiation. This can in certain cases cause a degradation of the properties of these materials and consequently affect the good function of the installation. The author has taken at CERN large number of samples of materials in order to determine their radioresistance. Generally the organic materials and the electronic components are more sensitive to ionizing radiation. The author presents the results of these studies which concern the isolations of the cables (polyethylene, polyvinyl chloride, caoutchouc ethylene propylene, etc.), the isolations for the magnets on the base of epoxy resins, as well as other thermoresistant and thermoplastic products. The author equally presents a choice of materials and components which are used at CERN and which are resistant to radiations above an integral dose of 10 7 -10 8 Gy. (orig.)

  8. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  9. Process for running scrapers, particularly for subsea petroleum well lines; Fremgangsmaate ved kjoering av skrapere, saerlig for undervannspetroleumbroenn-roerledninger

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Jose Eduardo Mendonca da; Herdeiro, Marco Antonio Nogueira; Capplonch, Ricardo Wagner; Miranda, Luiz Vicente Auler Passos

    1997-09-29

    The invention relates to a cleaning method of offshore pipelines. A process for running scrapers for subsea petroleum well lines has, according to a first embodiment, launching a scraper through the line towards the wellhead on a step-by-step basis. The operation proceeds by sending the scraper along successively larger sections via reversing flow through the obstructed line to limit passage of the scraper to that obstructed line, until the whole line is swept. Furthermore, according to a second embodiment, the process consists of the launching of one or more scrapers from a chamber installed in the subsea production system, towards the platform, sweeping only the whole obstructed line, all at once. Once cleaning of the obstructed line is completed, new scrapers may be sent from the platform to the subsea equipment chamber where they are stored until a further cleaning operation is required. The chamber installed in the subsea equipment may serve more than one obstructed line

  10. On-line monitoring applications at nuclear power plants. A risk informed approach to calibration reduction

    International Nuclear Information System (INIS)

    Shankar, Ramesh; Hussey, Aaron; Davis, Eddie

    2003-01-01

    On-line monitoring of instrument channels provides increased information about the condition of monitored channels through accurate, more frequent evaluation of each cannel's performance over time. This type of performance monitoring is a methodology that offers an alternate approach to traditional time-directed calibration. EPRI's strategic role in on-line monitoring is to facilitate its implementation and cost-effective use in numerous applications at power plants. To this end, EPRI has sponsored an on-line monitoring implementation project at multiple nuclear plants specifically intended to install and use on-line monitoring technology. The selected on-line monitoring method is based on the Multivariate State Estimation Technique. The project has a planned three-year life; seven plants are participating in the project. The goal is to apply on-line monitoring to all types of power plant applications and document all aspects of the implementation process in a series of EPRI reports. These deliverables cover installation, modeling, optimization, and proven cost-benefit. This paper discusses the actual implementation of on-line monitoring to various nuclear plant instrument systems. Examples of detected instrument drift are provided. (author)

  11. Resolving piping analysis issues to minimize impact on installation activities during refueling outage at nuclear power plants

    International Nuclear Information System (INIS)

    Bhavnani, D.

    1996-01-01

    While it is required to maintain piping code compliance for all phases of installation activities during outages at a nuclear plant, it is equally essential to reduce challenges to the installation personnel on how plant modification work should be performed. Plant betterment activities that incorporate proposed design changes are continually implemented during the outages. Supporting analysis are performed to back these activities for operable systems. The goal is to reduce engineering and craft man-hours and minimize outage time. This paper outlines how plant modification process can be streamlined to facilitate construction teams to do their tasks that involve safety related piping. In this manner, installation can proceed by minimizing on the spot analytical effort and reduce downtime to support the proposed modifications. Examples are provided that permit performance of installation work in any sequence. Piping and hangers including the branch lines are prequalified and determined operable. The system is up front analyzed for all possible scenarios. The modification instructions in the work packages is flexible enough to permit any possible installation sequence. The benefit to this approach is large enough in the sense that valuable outage time is not extended and on site analytical work is not required

  12. A study for the installation of the TEXT heavy-ion beam probe on DIII-D

    Science.gov (United States)

    Edmonds, P. H.; Solano, E. R.; Bravenec, R. V.; Wootton, A. J.; Schoch, P. M.; Crowley, T. P.; Hickok, R. L.; West, W. P.; Leuer, J.; Anderson, P.

    1997-01-01

    An assessment of the feasibility of installing the TEXT 2 MeV heavy-ion beam probe on the DIII-D tokamak has been completed. Detailed drawings of the machine cross section were imported into the CAD application AutoCAD. A set of programs written in AutoLisp were used to generate trajectories. Displays of the accessible cross section of the plasma, scan lines for the entire range of primary beam energy and injection angle ranges, and sample-volume dimensions can be rapidly generated. Because of the large deflection between the primary input beam and the emergent secondary beam, either the analyzer needs to be tracked over a ±20° angle or secondary poloidal deflector plates need to be installed at the exit port. Toroidal deflector plates will be installed at both the injection and exit ports to compensate for toroidal displacements and deflections. The sample volumes generated by this procedure are within a few centimeters of the locations derived from a full three-dimensional calculation.

  13. Radiological reference base line establishment around CENM site

    International Nuclear Information System (INIS)

    Elkhoukhi, T.; Dehbi, N.; Amechmachi, N.

    2008-01-01

    Full text: As for any installation presenting risks for its surrounding, CENM (Centre d'Etudes Nucleaires de Maamora) that accommodates TRIGA Mark II Research Reactor and related laboratories is subjected to a statutory requirement stipulating that the CNESTEN (Centre National De L'Energie Des Sciences Et Des Techniques Nucleaires) that is in charge the operating of CENM must define its own environmental monitoring program assuring that the nuclear installation is in appropriateness with its environment. In this frame , since 1996 the team of USE (Unite Surveillance de L'Environnement) is conducting periodic work consisting in in-situ measurement of ambient gamma rays and collect of environmental samples and their preparation for adequate analysis form required for each radioactive measurement system. This first step of the environmental monitoring program allows establishing the radiological base line on the CENM's site. This base line is necessary to inform on the present radiological state in order to detect any change of this state consequently to the operating of the reactor or the arrival of abnormal radioactive panache from any source.

  14. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  15. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  16. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  17. Rock deformation equations and application to the study on slantingly installed disc cutter

    Science.gov (United States)

    Zhang, Zhao-Huang; Meng, Liang; Sun, Fei

    2014-08-01

    At present the mechanical model of the interaction between a disc cutter and rock mainly concerns indentation experiment, linear cutting experiment and tunnel boring machine (TBM) on-site data. This is not in line with the actual rock-breaking movement of the disc cutter and impedes to some extent the research on the rock-breaking mechanism, wear mechanism and design theory. Therefore, our study focuses on the interaction between the slantingly installed disc cutter and rock, developing a model in accordance with the actual rock-breaking movement. Displacement equations are established through an analysis of the velocity vector at the rock-breaking point of the disc cutter blade; the functional relationship between the displacement parameters at the rock-breaking point and its rectangular coordinates is established through an analysis of micro-displacement vectors at the rock-breaking point, thus leading to the geometric equations of rock deformation caused by the slantingly installed disc cutter. Considering the basically linear relationship between the cutting force of disc cutters and the rock deformation before and after the leap break of rock, we express the constitutive relations of rock deformation as generalized Hooke's law and analyze the effect of the slanting installation angle of disc cutters on the rock-breaking force. This will, as we hope, make groundbreaking contributions to the development of the design theory and installation practice of TBM.

  18. Precision-guided vehicle for transport and installation of LHC cryomagnets

    CERN Multimedia

    Maximilien Brice

    2003-01-01

    LHC quadrupoles and dipoles are heavier, longer and more fragile than the magnets used in CERN s former LEP collider. Therefore, an innovative solution for their transport and installation in the tunnel has been developed. It consists of convoys of two tractors, a trailer and unloading equipment. The convoys feature infrared optical guidance, which offsets the minimal clearance inside the tunnel, and are designed to minimize vibration of the magnets during transport. Operations will be monitored by a technician, who will take over the controls to unload and install the magnets. The first such convoy is now undergoing testing in the tunnel. The people who have contributed to the new transport system are pictured here at Point 4 in the LHC tunnel where tests on the first convoy are being conducted. The optical guidance system uses the white lines on the floor (Photos 01 and 03) to steer the vehicle in the tunnel. The prototype quadrupole magnet used in the tests is visible in Photos 02 and 04.

  19. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  20. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  1. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  2. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    International Nuclear Information System (INIS)

    Robinson, Sharon M.; Jubin, Robert Thomas; Patton, Bradley D.; Sullivan, Nicholas M.; Bugbee, Kathy P.

    2009-01-01

    the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES and H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

  3. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  4. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  5. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  6. Automatic tuning of the LBL SuperHILAC third-injector transport line

    Energy Technology Data Exchange (ETDEWEB)

    Pines, H.

    1983-03-01

    Testing of a new automatic tuning procedure in an LBL SuperHILAC beam transport line has been conducted with the third injector microcomputer control system. This technique is an advance over the sequential station-by-station automatic tuning method developed for the Bevalac transfer line. The computer now performs steering/focusing adjustments simultaneously on a number of quadrupole and dipole magnets comprising multiple-station sections of the injection line. New magnet currents are computed from equations governing beam optics in a real-time simulation of the beam line. The key to this emittance utilizing the same control magnets and beam profile monitors used for manual tuning of the line. This emittance calculation requires high resolution beam profile measurements using multi-wire profile monitors recently installed in the third injector line.

  7. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  8. Assessing and preparing a pipeline for in line inspection

    Energy Technology Data Exchange (ETDEWEB)

    Payne, Larry [T.D. Williamson Inc., Tulsa, OK (United States)

    2003-07-01

    In today's pipeline environment, operators around the world face new and emerging state and federal regulations requiring validation of their pipelines' integrity. In line inspection, or smart pigging, is generally the preferred methodology used to investigate metal loss and corrosion in pipelines. Although many pipelines can accommodate smart pigging, there are many pipelines that cannot, for various reasons. Those reasons can vary from not having pig launchers and receivers installed on the line to impassable bends or restrictions and general cleanliness of the pipeline itself. Pipeline cleanliness, more times than not, is one of the main reasons for inaccurate in line inspection data gathering or failed smart pig runs. (author)

  9. Initial Beam Test of the Prototype Strip Line BPM

    International Nuclear Information System (INIS)

    Kwon, Hyeok Jung; Kim, Han Sung; Seol, Kyung Tae; Ryu, Jin Yeong; Jang, Ji Ho; Cho, Yong Sub

    2011-01-01

    A beam position monitor (BPM) was developed which would be used for the Proton Engineering Frontier Project (PEFP) beam line. It is a strip line BPM which is commonly used one for the proton beam. The BPM cross section was designed with the SUPERFISH code and the matching section to the feed through was designed by the MWS code. The design parameters of the BPM are shown in Table 1. The designed BPM was fabricated to verify the manufacturing process and check its electrical performance. After the low power test at the test stand, the BPM was installed at the 20-MeV proton accelerator beam line as shown in Fig. 1

  10. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  11. Groundwater quality monitoring well installation for Waste Area Grouping 4 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.

    1994-09-01

    This report documents the drilling and installation of 15 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 4. WAG 4 is comprised of about 27 acres located in Melton Valley approximately 2700 ft southwest of the Oak Ridge National Laboratory main plant. It contains three inactive solid waste management units: (1) the abandoned intermediate level liquid waste transfer line located along the WAG's northwestern boundary, (2) the experimental pilot pit area, and (3) SWSA 4, the largest unit in the WAG. The wells at WAG 4 were drilled and developed between September 1987 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy (DOE), state, and Environmental Protection Agency regulatory requirements. The wells at WAG 4 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 4. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  12. RMR. A new portable Reactivity Measuring System installed at NPP Paks

    International Nuclear Information System (INIS)

    Czibok, T.; Horvath, C.; Bara, P.; Dezsoe, Z.; Laz, J.; Vegh, J.; Pos, I.

    2003-01-01

    The Hungarian Paks NPP is conducting a two year project for upgrading the reactivity measuring system applied during reactor startup experiments. The NPP has decided to replace almost all components of the previous system, only ionisation chambers remain unaltered. Devices for measuring neutron flux by means of ionisation chambers, for data acquisition and for measurement evaluation were completely renewed: new hardware-software components were introduced. Autonomous, high-precision current measuring systems (picoampere meters) are applied at each reactor unit, the converted picoampere signals are handled by a portable processing unit. The portable unit - based on a notebook PC - handles measured signals by using a high-precision A/D converter card, the scan time is 0.10 sec. In addition to handling three ionisation chamber signals the portable unit collects control rod position measurements through a serial line. The portable unit is able to receive additional measured data (e.g. core inlet temperature and boron concentration) from the process computer via local area network. Archiving of all measured and calculated data is performed in a redundant manner: data are stored locally and in the process computer, as well. The new system applies an accurate on-line reactivity calculation algorithm based on the point-kinetic model with 6 delayed neutron groups. Input data (effective delayed neutron fraction and other delayed neutron parameters) to the on-line calculation are taken from the off-line core design calculation. Detailed evaluation and analysis of startup measurements can be performed also on the portable unit. The user interface of the system is tailored to support various startup measurement tasks effectively: measured and calculated data are displayed on trends and on dedicated pictures. A user-friendly trending and listing graphic tool facilitates visualisation of archived data. The paper describes the architecture, data acquisition modules, algorithms and

  13. THROUGH-THE-EARTH (TTE) COMMUNICATIONS SYSTEM AND THE IN-MINE POWER LINE (IMPL) COMMUNICATIONS SYSTEM

    International Nuclear Information System (INIS)

    Zvi H. Meiksin

    2002-01-01

    Work has progressed on both subsystems: the Through-the-Earth (TTE) Communications system and the In-Mine Power Line (IMPL) Communications system. The TTE system: The system was fabricated and repackaged as an industrial product enclosed in a commercial rugged, waterproof housing suitable for installation in mines. Features were added to the system to appeal to the preferences of different mine managers. Arrangements were made with NIOSH to install the system in the Lake Lynn underground mine for evaluation and demonstration to potential users. The IMPL system: Voice compression was successfully implemented and incorporated into the laboratory model. Compressed voice was transmitted through a power line, expanded at the receiving end, and received with high clarity

  14. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  15. 46 CFR 111.60-5 - Cable installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  16. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  17. Drinking-water supply system of Arbedo-Castione. Replacement of the main water supply line and installation of a small hydropower plant; Sostituzione condotta adduzione sorgenti in valle d'Arbedo e ricupero energetico. Acquedotto di Arbedo-Castione

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2005-07-01

    This report presents the comparative evaluation of variants for the replacement work of the main drinking-water supply line from the Arbedo valley to the community of Arbedo-Castione, southern Switzerland. Three variants include the installation of a small hydropower plant to take advantage of the elevation difference of 340 m between the location of water collection and the water reservoir. The base case only includes the line replacement. The feasibility study includes both a technical and an economical analysis. The average water flow rate is estimated to 12 l/s. The nominal electrical power would be 25 kW. Power production cost is calculated to about 0.09 Swiss francs/kWh. The author concludes that an optimized variant with small hydropower plant would be the best solution, also from the point of view of environmental aspects.

  18. Linac4 chopper line commissioning strategy

    CERN Document Server

    Bellodi, G; Lombardi, A M; Posocco, P A; Sargsyan, E

    2010-01-01

    The report outlines the strategy for beam-based commissioning of the Linac4 3 MeV chopper line as currently scheduled to start in the second half of 2011 in the Test Stand Area. A dedicated temporary diagnostics test bench will complement the measurement devices foreseen for permanent installation in the chopper line. A commissioning procedure is set out as a series of consecutive phases, each one supposed to meet a well- defined milestone in the path to fully characterise the beam-line. Specific set-ups for each stage are defined in terms of beam characteristics, machine settings and diagnostics used. Operational guidelines are given and expected results at the relative points of measurements are shown for simulated scenarios (on the basis of multi-particle tracking studies carried out with the codes PATH and TRACEWin). These are then interpreted in the light of the resolution limits of the available diagnostics instruments to assess the precision reach on individual measurements and the feasibility of techn...

  19. A study for the installation of the TEXT heavy-ion beam probe on DIII-D

    International Nuclear Information System (INIS)

    Edmonds, P.H.; Solano, E.R.; Bravenec, R.V.; Wootton, A.J.; Schoch, P.M.; Crowley, T.P.; Hickok, R.L.; West, W.P.; Leuer, J.; Anderson, P.

    1997-01-01

    An assessment of the feasibility of installing the TEXT 2 MeV heavy-ion beam probe on the DIII-D tokamak has been completed. Detailed drawings of the machine cross section were imported into the CAD application AutoCAD. A set of programs written in AutoLisp were used to generate trajectories. Displays of the accessible cross section of the plasma, scan lines for the entire range of primary beam energy and injection angle ranges, and sample endash volume dimensions can be rapidly generated. Because of the large deflection between the primary input beam and the emergent secondary beam, either the analyzer needs to be tracked over a ±20 degree angle or secondary poloidal deflector plates need to be installed at the exit port. Toroidal deflector plates will be installed at both the injection and exit ports to compensate for toroidal displacements and deflections. The sample volumes generated by this procedure are within a few centimeters of the locations derived from a full three-dimensional calculation.copyright 1997 American Institute of Physics

  20. Seismic qualification of existing nuclear installations in India - a proposal

    International Nuclear Information System (INIS)

    Basu, P.C.

    2001-01-01

    In India, the work toward seismic qualification of existing nuclear facilities has been started. Preliminary work is being undertaken with respect to identifying the facilities which would be taken up for seismic qualification, approach and methodology for re-evaluation for seismic safety, acceptance criteria, etc. Work has also been started for framing up the criteria and methodology of the seismic qualification of these facilities. Present paper contains the proposal in this respect. This proposal is on similar lines of the present practice of seismic qualification of NPP, as summarized in the Appendix, but has been modified to suit the special requirements of Indian nuclear installations. (author)

  1. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  2. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  3. A General Purpose High Performance Linux Installation Infrastructure

    International Nuclear Information System (INIS)

    Wachsmann, Alf

    2002-01-01

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation

  4. Transmission line capital costs

    International Nuclear Information System (INIS)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy's Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs

  5. Hydrodynamic problems of heavy liquid metal coolants technology in loop-type and mono-block-type reactor installations

    International Nuclear Information System (INIS)

    Orlov, Yuri I.; Efanov, Alexander D.; Martynov, Pyotr N.; Gulevsky, Valery A.; Papovyants, Albert K.; Levchenko, Yuri D.; Ulyanov, Vladimir V.

    2007-01-01

    In the report, the influence of hydrodynamics of the loop with heavy liquid metal coolants (Pb and Pb-Bi) on the realization methods and efficiency of the coolant technology for the reactor installations of loop, improved loop and mono-block type of design has been studied. The last two types of installations, as a rule, are characterized by the following features: availability of loop sections with low hydraulic head and low coolant velocities, large squares of coolant free surfaces; absence of stop and regulating valve, auxiliary pumps on the coolant pumping-over lines. Because of the different hydrodynamic conditions in the installation types, the tasks of the coolant technology have specific solutions. The description of the following procedures of coolant technology is given in the report: purification by hydrogen (purification using gas mixture containing hydrogen), regulation of dissolved oxygen concentration in coolant, coolant filtrating, control of dissolved oxygen concentration in coolant. It is shown that change of the loop design made with economic purpose and for improvement of the installation safety cause additional requirements to the procedures and apparatuses of the coolant technology realization

  6. On-Line Monitoring of Instrument Channel Performance in Nuclear Power Plant Using PEANO

    International Nuclear Information System (INIS)

    Fantoni, Paolo F.; Hoffmann, Mario; Shankar, Ramesh; Davis, Eddie L.

    2002-01-01

    On-Line monitoring evaluates instrument channel performance by assessing its consistency with other plant indications. Industry and EPRI experience at several plants has shown this overall approach to be very effective in identifying instrument channels that are exhibiting degrading or inconsistent performance characteristics. On-Line monitoring of instrument channels provides information about the condition of the monitored channels through accurate, more frequent monitoring of each channel's performance over time. This type of performance monitoring is a methodology that offers an alternate approach to traditional time-directed calibration. On-line monitoring of these channels can provide an assessment of instrument performance and provide a basis for determining when adjustments are necessary. Elimination or reduction of unnecessary field calibrations can reduce associated labor costs, reduce personnel radiation exposure and reduce the potential for miss-calibration. PEANO is a system for on-line calibration monitoring developed in the years 1995-2000 at the Institutt for energiteknikk (IFE), Norway, which makes use of Artificial Intelligence techniques for its purpose. The system has been tested successfully in Europe in off-line tests with EDF (France), Tecnatom (Spain) and ENEA (Italy). PEANO is currently installed and used for on-line monitoring at the HBWR reactor in Halden. This paper describes the results of performance tests on PEANO with real data from a US PWR plant, in the framework of a co-operation among IFE, EPRI and Edan Engineering, to evaluate the potentials of PEANO for future installations in US nuclear plants. (authors)

  7. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    There is a great politically will to expand the green energy market in these times. A proven green technology is wind turbines. Wind turbines have been installed in great numbers on land over the last decades. However, the current development in wind turbine design leads to larger turbine sizes...... in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...

  8. Evaluation of Instrumentation and Dynamic Thermal Ratings for Overhead Lines

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, A. [New York Power Authority, White Plains, NY (United States)

    2013-01-31

    In 2010, a project was initiated through a partnership between the Department of Energy (DOE) and the New York Power Authority (NYPA) to evaluate EPRI's rating technology and instrumentation that can be used to monitor the thermal states of transmission lines and provide the required real-time data for real-time rating calculations. The project included the installation and maintenance of various instruments at three 230 kV line sites in northern New York. The instruments were monitored, and data collection and rating calculations were performed for about a three year period.

  9. A dented LH2 recirculation line is removed from Discovery

    Science.gov (United States)

    1999-01-01

    In the Payload Changeout Room, Launch Pad 39B, United Space Alliance and NASA workers look at the replacement main propulsion system liquid hydrogen recirculation line (left) to be installed in Shuttle Discovery's aft compartment. At right is the dented line that has been removed. The 12-inch-long dent was discovered during routine aft compartment inspections Tuesday, Dec. 7. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. The line is being replaced and managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.

  10. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  11. Does drywall installers' innovative idea reduce the ergonomic exposures of ceiling installation: A field case study.

    Science.gov (United States)

    Dasgupta, Priyadarshini Sengupta; Punnett, Laura; Moir, Susan; Kuhn, Sarah; Buchholz, Bryan

    2016-07-01

    The study was conducted to assess an intervention suggested by the workers to reduce the physical or ergonomic exposures of the drywall installation task. The drywall installers were asked to brainstorm on innovative ideas that could reduce their ergonomic exposures during the drywall installation work. The workers proposed the idea of using a 'deadman' (narrow panel piece) to hold the panels to the ceiling while installing them. The researcher collected quantitative exposure data (PATH, 3DSSPP) at the baseline and intervention phases and compared the phases to find out any change in the exposure while using the 'deadman'. Results showed that ergonomic exposures (such as overhead arm and awkward trunk postures and heavy load handling) were reduced at the intervention phase while using the 'deadman' with an electrically operated lift. The concept of the 'deadman', which was shown to help reduce musculoskeletal exposures during ceiling installation, can be used to fabricate a permanent ergonomic tool to support the ceiling drywall panel. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  12. Installations solaires photovoltaïques

    CERN Document Server

    2014-01-01

    Cet ouvrage présente les règles de conception et de mise en œuvre des installations photovoltaïques raccordées au réseau public de distribution à basse tension. Il s’applique aux bâtiments neufs et existants et concerne non seulement les petites installations résidentielles, d’une puissance de l’ordre de quelques kWc, mais aussi celles des bâtiments collectifs, tertiaires ou agricoles. Il traite successivement : - des fondamentaux de l'énergie solaire photovoltaïque (gisement solaire, principe de la conversion, composants d'une installation...) ; - du dimensionnement de l'installation (choix des matériels, règles de conception, estimation de l'énergie récupérable...) ; - de sa mise en oeuvre (travail en hauteur, habilitation électrique, mise en service, maintenance...) ; - des démarches administratives nécessaires (aides financières, accès au réseau de distribution, vente de l'électricité produite...).

  13. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  14. Damping of cable vibrations in overhead lines. Daempfung von Leiterseilschwingungen in Hochspannungs-Freileitungen

    Energy Technology Data Exchange (ETDEWEB)

    Moecks, L

    1981-01-01

    The 'Stockbridge'-type vibration damper is presented and its dynamic characteristics are analytically described. In consideration of standard line data a dynamic model of the overhead line is designed. The vibration impulse by the wind and self-damping of the cable are explained with relations being deduced. The entire mathematical model 'overhead line with and without damper' is finally forming the basis for performing numerous parameter studies, with the importance of the damper characteristics and the damper installation site to the value of the dynamic load of the cable being shown very clearly. The presented technique is also convenient for checking the vibration intensity of overhead lines to be newly planned.

  15. Performance analysis of flow lines with non-linear flow of material

    CERN Document Server

    Helber, Stefan

    1999-01-01

    Flow line design is one of the major tasks in production management. The decision to install a set of machines and buffers is often highly irreversible. It determines both cost and revenue to a large extent. In order to assess the economic impact of any possible flow line design, production rates and inventory levels have to be estimated. These performance measures depend on the allocation of buffers whenever the flow of material is occasionally disrupted, for example due to machine failures or quality problems. The book describes analytical methods that can be used to evaluate flow lines much faster than with simulation techniques. Based on these fast analytical techniques, it is possible to determine a flow line design that maximizes the net present value of the flow line investment. The flow of material through the line may be non-linear, for example due to assembly operations or quality inspections.

  16. Deflection estimation of a wind turbine blade using FBG sensors embedded in the blade bonding line

    International Nuclear Information System (INIS)

    Kim, Sang-Woo; Kang, Woo-Ram; Jeong, Min-Soo; Lee, In; Kwon, Il-Bum

    2013-01-01

    Estimating the deflection of flexible composite wind turbine blades is very important to prevent the blades from hitting the tower. Several researchers have used fiber Bragg grating (FBG) sensors—a type of optical fiber sensor (OFS)—to monitor the structural behavior of the blades. They can be installed on the surface and/or embedded in the interior of composites. However, the typical installation positions of OFSs present several problems, including delamination of sensing probes and a higher risk of fiber breakage during installation. In this study, we proposed using the bonding line between the shear web and spar cap as a new installation position of embedded OFSs for estimating the deflection of the blades. Laboratory coupon tests were undertaken preliminarily to confirm the strain measuring capability of embedded FBG sensors in adhesive layers, and the obtained values were verified by comparison with results obtained by electrical strain gauges and finite element analysis. We performed static loading tests on a 100 kW composite wind turbine blade to evaluate its deflections using embedded FBG sensors positioned in the bonding line. The deflections were estimated by classical beam theory considering a rigid body rotation near the tip of the blade. The evaluated tip deflections closely matched those measured by a linear variable differential transformer. Therefore, we verified the capability of embedded FBG sensors for evaluating the deflections of wind turbine blades. In addition, we confirmed that the bonding line between the shear web and spar cap is a practical location to embed the FBG sensors. (paper)

  17. 46 CFR 58.10-5 - Gasoline engine installations.

    Science.gov (United States)

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... of such protection. (d) Exhaust pipe. (1) Exhaust pipe installations must conform to the requirements...

  18. Installation for analytic chemistry under irradiation; Installation de chimie analytique sous rayonnement

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Azoeuf, P; Guillon, A [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1966-07-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [French] L'installation a ete realisee pour effectuer des manipulations et des analyses chimiques sur des produits radioactifs. Elle est totalement telecommandee et se presente sous une forme lineaire de 15 metres de longueur et comporte trois zones: - une zone active d'appareillage, - une zone arriere d'intervention, - une zone avant independante des deux premieres et totalement protegee, ou s'operent les telecommandes de l'appareillage. L'ensemble a ete concu de facon a ce que chaque appareillage correspondant a une technique d'analyse soit implante dans une enceinte etanche. Les enceintes etanches sont reliees entre elles par un convoyeur. Apres trois annees de fonctionnement nous faisons le bilan et les critiques de l'installation. (auteurs)

  19. Dynamic behaviour of the contact line for 350 km/h on the new line Wuhan - Guangzhou; Dynamisches Verhalten der Oberleitung fuer 350 km/h auf der neuen Strecke Wuhan - Guangzhou

    Energy Technology Data Exchange (ETDEWEB)

    Zimmert, Gerhard [Balfour Beatty Rail, Beijing (China)

    2010-04-15

    Only after four and a half years of construction activities regular services started on the approximately 1 000 km long new high-speed line Wuhan - Guangzhou in the People's Republic of China. Achieving 320 to 330 km/h commercial speed, this line is the fastest railway connection in the world. The dynamic interaction between contact line and pantograph determines the maximally possible speed to an increasing extent. Worldwide, there is only low experience on the contact line dynamic behavior at this speed level. Balfour Beatty Rail designed the contact line for this installation, participated essentially in the implementation and, therefore, was in charge of proving the contact line quality. A series of test runs concerning the geometrical requirements and the contact force behaviour eventually proved the suitability of the system. (orig.)

  20. Collimation in the Transfer Lines to the LHC

    CERN Document Server

    Burkhardt, H; Kadi, Y; Kain, V; Weterings, W

    2004-01-01

    The intensities foreseen for injection into the LHC are over an order of magnitude above the expected damage levels. The TI 2 and TI 8 transfer lines between the SPS and LHC are each about 2.5 km long and comprise many magnet families. Despite planned power supply surveillance and interlocks, failure modes exist which could result in uncontrolled beam loss and serious transfer line or LHC equipment damage. We describe the collimation system in the transfer lines that has been designed to provide passive protection against damage at injection. Results of simulations to develop a conceptual design are presented. The optical and physical installation constraints are described, and the resulting element locations and expected system performance presented, in terms of the phase space coverage, local element temperature rises and the characteristics of the beam transmitted into the LHC.

  1. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  2. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  3. Decree No. 83/7405 of 18 November 1983 on the licensing procedure for nuclear installations

    International Nuclear Information System (INIS)

    1983-01-01

    This Decree (No. 83/7405) on the licensing procedure for nuclear installations came into force on 19 December 1983 and supersedes Decree No. 7/9141 of 5 December 1974 on the same subject. The general lines of the licensing procedure laid down by this new Decree are similar to that provided by the 1979 Decree; it is also carried out in three stages: site, construction and operating licences are delivered in succession. (NEA) [fr

  4. Competent person for radiation protection. Practical radiation protection for base nuclear installations and installations classified for the environment protection

    International Nuclear Information System (INIS)

    Pin, A.; Perez, S.; Videcoq, J.; Ammerich, M.

    2008-01-01

    This book corresponds to the practical module devoted to the base nuclear installations and to the installations classified for the environment protection, that is to say the permanent nuclear installations susceptible to present risks for the public, environment or workers. Complied with the legislation that stipulates this module must allow to apply the acquired theoretical training to practical situations of work, it includes seven chapters as follow: generalities on access conditions in regulated areas of nuclear installation,s or installations classified for environment protection and clothing against contamination; use of control devices and management of damaged situations; methodology of working place studies, completed by the application to a real case of a study on an intervention on a containment wall; a part entitled 'take stock of the situation' ends every chapter and proposes to the reader to check its understanding and acquisition of treated knowledge. (N.C.)

  5. 24 CFR 3280.709 - Installation of appliances.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Installation of appliances. 3280... Fuel Burning Systems § 3280.709 Installation of appliances. (a) The installation of each appliance... the manufacturer's instructions attached to the appliance. Every appliance shall be secured in place...

  6. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  7. Successful pipeline installation for Parque das Conchas development; Subsea installation

    Energy Technology Data Exchange (ETDEWEB)

    Bartz, Cesar

    2010-07-01

    Subsea 7 has successfully delivered again in Brazilian deep-waters. The subsea engineering and construction company has recently completed pipeline installation activities for the Parque das Conchas (BC-10) development, offshore Brazil. (AG)

  8. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  9. 46 CFR 181.520 - Installation and location.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer in...

  10. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  11. BEAM LINE DESIGN FOR THE CERN HIRADMAT TEST FACILITY

    CERN Document Server

    Hessler, C; Goddard, B; Meddahi, M; Weterings, W

    2009-01-01

    The LHC phase II collimation project requires beam shock and impact tests of materials used for beam intercepting devices. Similar tests are also of great interest for other accelerator components such as beam entrance/exit windows and protection devices. For this purpose a dedicated High Radiation Material test facility (HiRadMat) is under study. This facility may be installed at CERN at the location of a former beam line. This paper describes the associated beam line which is foreseen to deliver a 450 GeV proton beam from the SPS with an intensity of up to 3×1013 protons per shot. Different beam line designs will be compared and the choice of the beam steering and diagnostic elements will be discussed, as well as operational issues.

  12. Beam Line Design for the CERN Hiradmat Test Facility

    CERN Document Server

    Hessler, C; Goddard, B; Meddahi, M; Weterings, W

    2010-01-01

    The LHC phase II collimation project requires beam shock and impact tests of materials used for beam intercepting devices. Similar tests are also of great interest for other accelerator components such as beam entrance/exit windows and protection devices. For this purpose a dedicated High Radiation Material test facility (HiRadMat) is under study. This facility may be installed at CERN at the location of a former beam line. This paper describes the associated beam line which is foreseen to deliver a 450 GeV proton beam from the SPS with an intensity of up to 3×10**13 protons per shot. Different beam line designs will be compared and the choice of the beam steering and diagnostic elements will be discussed, as well as operational issues.

  13. Design of the ESCAR injection beam line

    International Nuclear Information System (INIS)

    Tanabe, J.; Staples, J.; Yourd, R.

    1975-01-01

    The design features of the elements of the ESCAR (Experimental Superconducting Accelerator Ring) injection beam line are described. The junction of the proton transport system with the ESCAR injection straight section requires the design of mechanical elements compatible with the 10 -11 torr vacuum requirements of the main ring. These elements include a novel septum magnet whose salient design features include a current-carrying septum of tapered thicknesses to reduce the overall power requirements and total enclosure of the magnet coil in a metal can for vacuum compatibility. Other elements are a wire electro-static septum and several fast-rise ''bump magnets''. A transition cryopump is designed to separate the main ring vacuum from the relatively poor 10 -6 torr vacuum of the conventional beam transport line. A brief description of the conventional beam transport line from the 50 MeV proton linac, recently installed for Bevatron injection,is also included. (U.S.)

  14. 46 CFR 58.10-10 - Diesel engine installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  15. On-line analyzers to distributed control system linking

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, S.F.; Buchanan, B.R.; Sanders, M.A.

    1990-01-01

    The Analytical Development Section (ADS) of the Savannah River Laboratory is developing on-line analyzers to monitor various site processes. Data from some of the on-line analyzers (OLA's) will be used for process control by distributed control systems (DCS's) such as the Fisher PRoVOX. A problem in the past has been an efficient and cost effective way to get analyzer data onto the DCS data highway. ADS is developing a system to accomplish the linking of OLA's to PRoVOX DCS's. The system will be described, and results of operation in a research and development environment given. Plans for the installation in the production environment will be discussed.

  16. 32 CFR 634.25 - Installation traffic codes.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activit...

  17. Study of Parameters that Determine Railway Line Capacity

    Directory of Open Access Journals (Sweden)

    Josip Kukec

    2005-07-01

    Full Text Available In this work the study focuses on:- determining the elements required to determine the locationfor the installation of the main signals,- calculated block lengths, and- calculations of optimal head ways, that have not been studiedin detail although they deserve special attention due totheir impact.Generally speaking, the signals are installed in compliancewith the local circumstances, i. e. according to the technicaland technological characteristics and conditions determinedby the traffic places of work they protect.The distribution and length of the blocks depend on: therailway line and its exploitation characteristics, structure andtype of trains that run on the railway line, traffic organisationand signalisation system, as well as technical and exploitationcharacte1istics of the traction vehicles and the rolling stock.What has to be considered is that the minimum section lengthcannot be shorter than the length of the braking distance, i. e.the length of the longest train which runs on the respective railwayline.The study of these parameters is supplemented by the calculationof the reduction in throughput capacity depending on thelack of uniformity in the operation of trains, which, in order tomaintain the design quality of the transportation se1vice, and inthe activities of establishing and implementing the business policyshouldn't be left out nor bypassed.

  18. Evaluation of Fibre Lifetime in Optical Ground Wire Transmission Lines

    Science.gov (United States)

    Grunvalds, R.; Ciekurs, A.; Porins, J.; Supe, A.

    2017-06-01

    In the research, measurements of polarisation mode dispersion of two OPGWs (optical ground wire transmission lines), in total four fibres, have been carried out, and the expected lifetime of the infrastructure has been assessed on the basis of these measurements. The cables under consideration were installed in 1995 and 2011, respectively. Measurements have shown that polarisation mode dispersion values for cable installed in 1995 are four times higher than that for cable installed in 2011, which could mainly be explained by technological differences in fibre production and lower fibre polarisation mode dispersion requirements in 1995 due to lack of high-speed (over 10 Gbit/s) optical transmission systems. The calculation methodology of non-refusal work and refusal probabilities, using the measured polarisation mode dispersion parameters, is proposed in the paper. Based on reliability calculations, the expected lifetime is then predicted, showing that all measured fibres most likely will be operational within minimum theoretical service life of 25 years accepted by the industry.

  19. Modern electrical installation for craft students

    CERN Document Server

    Scaddan, Brian

    2013-01-01

    Modern Electrical Installation for Craft Students, Volume 2, Third Edition discusses several topics concerning electrical installations. The book is comprised of eight chapters that deal with craft theory, associated subjects, and electrical industries. Chapter 1 covers inductors and inductance, while Chapter 2 tackles capacitors and capacitance. Chapter 3 deals with inductance and capacitance in installation work. The book also discusses cells, batteries, and transformers. The electrical industries, control and earthing, and testing are also dealt with. The last chapter discusses the basic el

  20. Nuclear Plant Analyzer: Installation manual. Volume 1

    International Nuclear Information System (INIS)

    Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R.

    1995-01-01

    This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays

  1. A novel method for coiled tubing installation

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Peter J. [2H Offshore, Houston, TX (United States); Tibbetts, David [Aquactic Engineering and Construction Ltd., Aberdeen (United Kingdom)

    2009-12-19

    Installation of flexible pipe for offshore developments is costly due to the physical cost of the flexible pipe, expensive day rates and the availability of suitable installation vessels. Considering the scarcity of flexible pipe in today's increasingly demanding and busy market, operators are seeking a cost effective solution for installing piping in a range of water depths using vessels which are readily on hand. This paper describes a novel approach to installing reeled coiled tubing, from 1 inch to 5 inch diameter, from the back of a small vessel in water depths from 40 m up to around 1000 m. The uniqueness of the system is the fact that the equipment design is modular and compact. This means that when disassembled, it fits into standard 40 ft shipping containers, and the size allows it to be installed on even relatively small vessels of opportunity, such as anchor handling or installation vessels, from smaller, and cheaper quay side locations. Such an approach is the ideal solution to the problem faced by operators, in that it allows the installation of cheaper, readily available coiled tubing, from cost-effective vessels, which do not need to transit to a pick up the system. (author)

  2. Development of an Ethernet enabled microcontroller based module for Superconducting Cyclotron ECR beam line control

    International Nuclear Information System (INIS)

    Chatterjee, M.; Koley, D.; Nabhiraj, P.Y.

    2012-01-01

    An Ethernet enabled control and data acquisition module is developed for remote control and monitoring of the ECR beam line equipment of the Superconducting Cyclotron. The PIC microcontroller based module supports multiple general purpose analog and digital inputs and outputs for interfacing with various equipments and an embedded web server. The remote monitoring and control of the equipment are achieved through the web based user interface. The user authenticated access to control parameters and module configuration parameters ensures the operational safety of the equipment under control. This module is installed in Superconducting Cyclotron ECR beam line for the control and monitoring of vacuum pumping modules, comprising of pumps, gate valves and dual vacuum gauges. The installation of these modules results in a distributed control with localised field cabling and hence better fault diagnosis. (author)

  3. Geometry and Optics of the Electrostatic ELENA Transfer Lines

    CERN Document Server

    Vanbavinckhove, G; Barna, D; Bartmann, W; Butin, F; Choisnet, O; Yamada, H

    2013-01-01

    The future ELENA ring at CERN will decelerate the AD anti-proton beam further from 5.3 MeV to 100 keV kinetic energy, to increase the efficiency of anti-proton trapping. At present there are four experiments in the AD hall which will be complemented with the installation of ELENA by additional three experiments and an additional source for commissioning. This paper describes the optimization of the transfer line geometry, ring rotation and source position. The optics of the transfer lines and error studies to define field and alignment tolerances are shown, and the optics particularities of electrostatic elements and their optimization highlighted.

  4. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects......; Transforming materiality; Adding virtual objects; 3D effects; Complex content on simple objects or simple content on complex; Strong versus loose connections between the physical object and the digital content. This paper is based on four cases, two of which concern cultural heritage installations, the others...

  5. Python Introduction and Installation

    OpenAIRE

    William J. Turkel; Adam Crymble

    2012-01-01

    This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo ...

  6. Lietojumprogrammu instalāciju izveides risinājumi

    OpenAIRE

    Zālītis, Mārtiņš

    2010-01-01

    Bakalaura darbā „Lietojumprogrammu instalāciju izveides risinājumi” mērķis ir izanalizēt lietotājam draudzīgas un nedraudzīgas instalācijas, kā arī salīdzināt instalāciju veidošanas rīkus, norādot uz to stiprajām un vājajām pusēm. Lai izpētītu instalāciju izveides iespējas tiek izmantota tīmeklī pieejamā informācija, autora darbs ar instalāciju rīkiem un to novērtējums. Parādīta sarežģītas instalācijas uzbūve, kas izveidota ar NSIS instalāciju rīku, kuru arī autors atzīst par labāko risinājum...

  7. Lessons learned from installation of an environmental horizontal well

    International Nuclear Information System (INIS)

    Oakley, D.B.; Nickelson, M.D.

    1994-01-01

    At Williams Air Force Base near Phoenix, Arizona, a Pilot Study/Demonstration Study is being performed to evaluate the effectiveness of horizontal vs vertical wells in remediating and containing a jet fuel contaminant plume. An early stage of this project included successful installation of the world's longest, deepest environmental horizontal well. The horizontal well was installed using river crossing technology developed for drilling boreholes and installing utility conduits under rivers. Boreholes more than 5,000 ft. long have been successfully installed using river crossing technology. However, these boreholes are typically shallower than 100 ft. below land surface. Installation of the environment horizontal well proved to be extremely challenging because of the depth, the length of the borehole, and the requirements dictated by well installation criteria. Two installation attempts failed before the successful installation. The first installation attempt failed during well material installation. The second attempt resulted in the drill string becoming permanently stuck and abandoned downhole. The history of the two failed and one successful installation attempts demonstrates several lessons learned, including (1) streamline the well materials installation process as much as possible; (2) guar-gum-based drilling muds do not have the gel strength to remove sufficient cuttings from deep boreholes; (3) if sandpack around the well screen is required, a prepack screen should be installed--avoid using tremie pipes for installing a sandpack; (4) drill string location information provided by surface magnetic systems is unreliable at 150 ft. or more bls; and (5) for difficult drilling conditions, 24 hr./day drilling is recommended

  8. Optical fibers installation the different technologies and the advantages of using the RTE power grid; Pose de fibres optiques les differentes technologies et les avantages lies a l'utilisation du reseau de transport d'electricite de RTE

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    To install optical fibers lines RTE implements two different technologies: the THYM line and the COE line. The two technologies are explained and compared with the advantages of using RTE for such an equipment. (A.L.B.)

  9. Transport and dosimetric solutions for the ELIMED laser-driven beam line

    Energy Technology Data Exchange (ETDEWEB)

    Cirrone, G.A.P. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Romano, F. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Medical Physics School, University of Catania, Via S. Sofia 64 - 95125 Catania (Italy); Scuderi, V. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Institute of Physics ASCR, v.v.i. (FZU), ELI-Beamlines Project, Na Slovance 2, 182 21 Prague (Czech Republic); Amato, A. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Candiano, G. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Medical Physics School, University of Catania, Via S. Sofia 64 - 95125 Catania (Italy); Cuttone, G. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Giove, D. [INFN Sezione di Milano, Via Celoria 16, Milano (Italy); Korn, G.; Krasa, J. [Institute of Physics ASCR, v.v.i. (FZU), ELI-Beamlines Project, Na Slovance 2, 182 21 Prague (Czech Republic); Leanza, R. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Universitá degli Studi di Catania, Dipartimento di Fisica e Astronomia, Via S. Sofia 64, Catania (Italy); Manna, R. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Maggiore, M. [INFN-LNL, Viale dell' Universitá 2 - 35020 Legnaro (PD) (Italy); Marchese, V. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Margarone, D. [Institute of Physics ASCR, v.v.i. (FZU), ELI-Beamlines Project, Na Slovance 2, 182 21 Prague (Czech Republic); Milluzzo, G. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Universitá degli Studi di Catania, Dipartimento di Fisica e Astronomia, Via S. Sofia 64, Catania (Italy); Petringa, G. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Sabini, M.G. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Azienda Ospedaliera Cannizzaro, Via Messina 829 - 95100 Catania (Italy); Schillaci, F. [INFN-LNS, Via S. Sofia 62 - 95125 Catania (Italy); Medical Physics School, University of Catania, Via S. Sofia 64 - 95125 Catania (Italy); and others

    2015-10-01

    Within 2017, the ELIMED (ELI-Beamlines MEDical applications) transport beam-line and dosimetric systems for laser-generated beams will be installed at the ELI-Beamlines facility in Prague (CZ), inside the ELIMAIA (ELI Multidisciplinary Applications of laser–Ion Acceleration) interaction room. The beam-line will be composed of two sections: one in vacuum, devoted to the collecting, focusing and energy selection of the primary beam and the second in air, where the ELIMED beam-line dosimetric devices will be located. This paper briefly describes the transport solutions that will be adopted together with the main dosimetric approaches. In particular, the description of an innovative Faraday Cup detector with its preliminary experimental tests will be reported.

  10. Importance of human factors on nuclear installations safety

    International Nuclear Information System (INIS)

    Caruso, G.J.

    1990-01-01

    Actually, installations safety and, in particular the nuclear installations infer a strong incidence in human factors related to the design and operation of such installations. In general, the experience aims to that the most important accidents have happened as result of the components' failures combination and human failures in the operation of safety systems. Human factors in the nuclear installations may be divided into two areas: economy and human reliability. Human factors treatments for the safety evaluation of the nuclear installations allow to diagnose the weak points of man-machine interaction. (Author) [es

  11. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  12. W-320 waste retrieval sluicing system transfer line flushing volume and frequency calculation

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1997-01-01

    The calculations contained in this analysis document establish the technical basis for the volume, frequency, and flushing fluid to be utilized for routine Waste Retrieval Sluicing System (WRSS) process line flushes. The WRSS was installed by Project W-320, Tank 241-C-106 Sluicing. The double contained pipelines being flushed have 4 inch stainless steel primary pipes. The flushes are intended to prevent hydrogen buildup in the transfer lines and to provide ALARA conditions for maintenance personnel

  13. Coiled transmission line pulse generators

    Science.gov (United States)

    McDonald, Kenneth Fox

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  14. 78 FR 28622 - Notice of Approval of Record of Decision for Extending F-Line Streetcar Service to Fort Mason...

    Science.gov (United States)

    2013-05-15

    ...] Notice of Approval of Record of Decision for Extending F-Line Streetcar Service to Fort Mason Center... Environmental Impact Statement (Final EIS) for extending the F-Line historic streetcar service to Fort Mason... turnaround terminus at the Fort Mason Center; and installing appurtenant features such as signals, crossings...

  15. Design and Installation of Irrigation System for the Expansion of Sugar cane- Industries in Ahvaz, IRAN.

    Science.gov (United States)

    Afshari, E.; Afshari, S.

    2005-12-01

    This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.

  16. Fuel followed control rod installation at AFRRI

    International Nuclear Information System (INIS)

    Moore, Mark; Owens, Chris; Forsbacka, Matt

    1992-01-01

    Fuel Followed Control Rods (FFCRs) were installed at the Armed Forces Radiobiology Research Institute's 1 MW TRIGA Reactor. The procedures for obtaining, shipping, and installing the FFCRs is described. As part of the FFCR installation, the transient rod drive was relocated. Core performance due to the addition of the fuel followed control rods is discussed. (author)

  17. The insurance of nuclear installations

    International Nuclear Information System (INIS)

    Francis, H.W.

    1977-01-01

    A brief account is given of the development of nuclear insurance. The subject is dealt with under the following headings: the need for nuclear insurance, nuclear insurance pools, international co-operation, nuclear installations which may be insured, international conventions relating to the liability of operators of nuclear installations, classes of nuclear insurance, nuclear reactor hazards and their assessment, future developments. (U.K.)

  18. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  19. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  20. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  1. Seismic Station Installation Orientation Errors at ANSS and IRIS/USGS Stations

    Science.gov (United States)

    Ringler, Adam T.; Hutt, Charles R.; Persfield, K.; Gee, Lind S.

    2013-01-01

    Many seismological studies depend on the published orientations of sensitive axes of seismic instruments relative to north (e.g., Li et al., 2011). For example, studies of the anisotropic structure of the Earth’s mantle through SKS‐splitting measurements (Long et al., 2009), constraints on core–mantle electromagnetic coupling from torsional normal‐mode measurements (Dumberry and Mound, 2008), and models of three‐dimensional (3D) velocity variations from surface waves (Ekström et al., 1997) rely on accurate sensor orientation. Unfortunately, numerous results indicate that this critical parameter is often subject to significant error (Laske, 1995; Laske and Masters, 1996; Yoshizawa et al., 1999; Schulte‐Pelkum et al., 2001; Larson and Ekström, 2002). For the Advanced National Seismic System (ANSS; ANSS Technical Integration Committee, 2002), the Global Seismographic Network (GSN; Butler et al., 2004), and many other networks, sensor orientation is typically determined by a field engineer during installation. Successful emplacement of a seismic instrument requires identifying true north, transferring a reference line, and measuring the orientation of the instrument relative to the reference line. Such an exercise is simple in theory, but there are many complications in practice. There are four commonly used methods for determining true north at the ANSS and GSN stations operated by the USGS Albuquerque Seismological Laboratory (ASL), including gyroscopic, astronomical, Global Positioning System (GPS), and magnetic field techniques. A particular method is selected based on site conditions (above ground, below ground, availability of astronomical observations, and so on) and in the case of gyroscopic methods, export restrictions. Once a north line has been determined, it must be translated to the sensor location. For installations in mines or deep vaults, this step can include tracking angles through the one or more turns in the access tunnel leading to

  2. Seismic studies for nuclear installations sites

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Faure, J.

    1988-01-01

    The french experience in seismic risks assessment for french nuclear installations permits to set out the objectives, the phases the geographic extensions of workings to be realized for the installation safety. The data to be collected for the safety analysis are specified, they concern the regional seismotectonics, the essential seismic data for determining the seism level to be taken into account and defining the soil movement spectra adapted to the site. It is necessary to follow up the seismic surveillance during the installation construction and life. 7 refs. (F.M.)

  3. Installation for producing sealed radioactive sources

    International Nuclear Information System (INIS)

    Fradin, J.; Hayoun, C.

    1969-01-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [fr

  4. Thin Spray-on Liner - a potential application. Demonstrated at a longwall installation on Dendrobium mine

    Energy Technology Data Exchange (ETDEWEB)

    Byrnes, Roger [BHP Billiton, NSW (Australia). Dendrobium Mine; Martin, Philip [BASF AG Australia (Australia). BASF-CC Australia Ltd' s

    2008-08-21

    The paper describes a potential application of a Thin Spray-on Liner, on a longwall installation in Australia. The BHPBilliton mine, Dendrobium, is a relatively new mine in the Southern New South Wales coalfields, near to Wollongong. Normal installation and start-up operations for a new longwall face is to completely rock bolt and mesh the face. The operations use plastic/glassfibre cutable rock bolts, with steel/plastic mesh to prevent spalling. The biggest problem on face start up is the sheets of steel or plastic mesh getting wrapped around the shearer disc, which requires time consuming additional work removing the mesh. BASF Construction Chemicals Australia Pty Ltd's Underground Construction group, (UGC), proposed the use of Masterseal 845A, a fast sprayable cementitious/polymer membrane material that could be trialed and used to replace the steel mesh, as a surface support in unison with the conventional cutable rock bolts. The application took 12 h spraying to cover the 240 m long face line which averaged about 3.3 m high. The product was sprayed between 3.5 m to 4 mm thick, and according to the mine operators was at least three times quicker than mesh installation, not withstanding the savings in transport of the awkward bundles of mesh. In conclusion the Thin Spray-on Liner (TSL) performed adequately and achieved it's objective in this installation at Dendrobium mine. (orig.)

  5. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  6. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  7. 49 CFR 393.30 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY...

  8. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  9. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  10. THROUGH-THE EARTH (TTE) SYSTEM AND THE IN-MINE POWER LINE (IMPL) SYSTEM

    International Nuclear Information System (INIS)

    Zvi H. Meiksin

    2001-01-01

    Work has progressed on both subsystems: the through-the-earth (TTE) system and the In-Mine Power Line (IMPL) system. After the Lab prototype of the IMPL system was perfected to function satisfactorily, the thrust of the work focused on building a first production prototype that can be installed and tested inside a mine. To obtain multi-channel voice communication through the TTE system, effort has proceeded to compress voice messages and make the format compatible with the power-line interface protocol

  11. Atmospheric pressure photoionization for enhanced compatibility in on-line micellar electrokinetic chromatography-mass spectrometry

    NARCIS (Netherlands)

    Mol, Roelof; De Jong, Gerhardus J.; Somsen, Govert W.

    2005-01-01

    Atmospheric pressure photoionization (APPI) is presented as a novel means for the combination of micellar electrokinetic chromatography (MEKC) and mass spectrometry (MS). The on-line coupling is achieved using an adapted sheath flow interface installed on an orthogonal APPI source. Acetone or

  12. Workshop on a project for a FZR-beam line at ESRF

    International Nuclear Information System (INIS)

    Matz, W.

    1993-10-01

    The Research Center Rossendorf (FZR) investigates the possibilities to install its own beam line as a Cooperate Research Group-project (CRG) at the European Synchrotron Radiation Facility (ESRF) in Grenoble. The main interests for the FZR to use high brillant synchrotron radiation are in the Institute of Radiochemistry and the Institute of Ion Beam Physics and Materials Research. This workshop was organized by these two institutes together with the FZR Study group Synchrotron. The purpose of the workshop was to achieve a better understanding for the technical needs of the projected beam line for the planned research projects. Experts with experience in beam line design met with the Rossendorf groups to discuss the best layout for such a beam line. The summary of this workshop and the copies of transparencies of the lectures that were given are published in this booklet. (orig.)

  13. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  14. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  15. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  16. Alignment of dipole magnet in micro-beam line of HIRFL

    International Nuclear Information System (INIS)

    Wang Shaoming; Chen Wenjun; Yang Shengli; Cai Guozhu; Guo Yizhen; Zhou Guangming; Man Kaidi; Song Mingtao

    2010-01-01

    Microbeam irradiation facility is an experiment platform, which can reduce the beam-spot on the irradiated sample to micrometer level, and can accurately locate and count the radioactive particles. It is a powerful research tool for the irradiation material science, irradiation biology, irradiation biomedicine and micro mechanical machining. The microbeam irradiation facility requires the precise work for installation and alignment. These conditions make magnet's change for directions and positions because the location space of dipole magnets in micro-beam line of HIRFL (Heavy Ion Research Facility in Lanzhou) is very small. It is a challenge for the installation and alignment work of magnets. It was solved by transforming coordinates of benchmarks of magnets, which controlled the error of magnet setup within error tolerance range. (authors)

  17. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  18. Statistical analysis of probabilistic models of software product lines with quantitative constraints

    DEFF Research Database (Denmark)

    Beek, M.H. ter; Legay, A.; Lluch Lafuente, Alberto

    2015-01-01

    We investigate the suitability of statistical model checking for the analysis of probabilistic models of software product lines with complex quantitative constraints and advanced feature installation options. Such models are specified in the feature-oriented language QFLan, a rich process algebra...... of certain behaviour to the expected average cost of products. This is supported by a Maude implementation of QFLan, integrated with the SMT solver Z3 and the distributed statistical model checker MultiVeStA. Our approach is illustrated with a bikes product line case study....

  19. The stripping foil test stand in the Linac4 transfer line

    CERN Document Server

    Weterings, W; Noulibos, R; Sillanoli, Y; van Trappen, P

    2015-01-01

    The 160 MeV H− beam from the Linac4 (L4) linear accelerator at CERN will be injected into the proton synchrotron booster (PSB) with a new H− charge-exchange injection system. It will include a stripping foil, to convert H− into protons by stripping off the electrons. To gain experience with these very fragile foils, prior to the installation in the PSB, and test different foil materials and thicknesses, lifetimes of the foils, the foil changing mechanism and interlocking functions, a stripping foil test stand will be installed in the L4 transfer line in 2015. This paper describes the mechanical design of the system and discusses the test possibilities and parameters.

  20. The stripping foil test stand in the Linac4 transfer line

    International Nuclear Information System (INIS)

    Weterings, W.; Bracco, C.; Noulibos, R.; Sillanoli, Y.; Trappen van, P.

    2015-01-01

    The 160 MeV H - beam from the Linac4 (L4) linear accelerator at CERN will be injected into the proton synchrotron booster (PSB) with a new H - charge-exchange injection system. It will include a stripping foil, to convert H - into protons by stripping off the electrons. To gain experience with these very fragile foils, prior to the installation in the PSB, and test different foil materials and thicknesses, lifetimes of the foils, the foil changing mechanism and interlocking functions, a stripping foil test stand will be installed in the L4 transfer line in 2015. This paper describes the mechanical design of the system and discusses the test possibilities and parameters. (author)

  1. Development regulation regarding with licensing of nuclear installation

    International Nuclear Information System (INIS)

    Bambang Riyono; Yudi Pramono; Dahlia Cakrawati Sinaga

    2011-01-01

    Provisions of Article 17 paragraph (3) of Law Number 10 Year 1997 on Nuclear cleary mandates for the establishment of government regulations (GR) on Nuclear licensing containing the requirements and procedure, both from the standpoint of their utilization and installation. To use has been rising GR No.29 Year 2008 on the Use of Ionizing Radiation Sources and Nuclear Materials, while for the installation has been published PP No.43 Year 2006 on Nuclear Reactor Licensing, and BAPETEN Chairman Decree No.3 Year 2006 on Non-reactor Nuclear Installation Licensing. Based on the background of the preparation of both the aforementioned are just regulate the reactor and utilization, not yet fully meet the mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear, including other nuclear installations. For these reasons, it initiated the need for a separate regulation containing provisions concerning licensing of non-reactor nuclear installations. On the other side from the understanding the legal aspects and interpretations of the Law No.10 of 2004 on the Establishment Regulation Legislation, should be in single mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear would only produce one of the requirements and procedure for the use or installation, or a maximum of two (2) GR related licensing the use and installation. This is encourages conducted the assessing or studies related to how possible it is according to the legal aspect is justified to combine in one Nuclear licensing regulations regarding both the use and installation, by looking at the complexity of installation and wide scope of utilization of nuclear energy in Indonesia. The results of this paper is expected to provide input in the preparation of GR on licensing of nuclear installations. (author)

  2. On-line monitoring system for I-131 manufacturing labs

    International Nuclear Information System (INIS)

    Osovizky, A.; Malamud, Y.; Paran, Y.; Tal, N.; Turgeman, S.; Weinstein, M.

    1997-01-01

    An on-line monitoring and safety system has been installed in a lab for manufacturing 1-131 capsules for nuclear medicine use. Production of up to 100mCi batches is performed in shielded glove boxes. The safety system is based on a unique, 'Medi SMARTS' system (Medical Survey Mapping Automatic Radiation Tracing System), that collects continuously the radiation measurements for processing, display, and storage for future retrieval. Radiation is measured by GM tubes, data is transferred to a data processing unit, and then via a RS-485 communication line to a computer. In addition to the operational advantages and radiation levels storage, the system is being evaluated for the purpose of identifying risky stages in the process. (authors)

  3. Decommissioning and dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Pelzer, N.

    1993-01-01

    The German law governing decommissioning and dismantling of nuclear installations can be called to be embryonic as compared to other areas of the nuclear regulatory system, and this is why the AIDN/INLA regional meeting organised by the German national committee in July 1992 in Schwerin has been intended to elaborate an assessment of the current legal situation and on this basis establish proposals for enhancement and development, taking into account the experience reported by experts from abroad. The proceedings comprise the paper of the opening session, 'Engineering and safety aspects of the decommissioning of nuclear installations', and the papers and discussions of the technical sessions entitled: - Comparative assessment of the regulatory regimes. - Legislation governing the decommissioning of nuclear installations in Germany. - Analysis of the purpose and law making substance of existing regulatory provisions for the decommissioning of nuclear installations. All seventeen papers of the meeting have been prepared for separate retrieval from the database. (orig./HSCH) [de

  4. Culture safety in the nuclear installation

    International Nuclear Information System (INIS)

    Benar Bukit

    2008-01-01

    Culture safety is aimed to empower all the personnel to contribute and responsible to the installation safety where they work in. Culture safety is important as there were so many accidents happened due to the little attention given to the safety, take as examples of what happened in Three Mille Island installation (1979) and Chernobyl (1986). These remind us that human factor gives a significant contribution to the failure of operational system which influences the safety. Therefore, as one of institutions which has nuclear installation. National Nuclear Energy Agency must apply the culture safety to guarantee the safety operation of nuclear installation to protect the personnel, community and environment from the hazard of radioactive radiation. Culture safety has two main components. The first component under the management responsibility is a framework needed in an organisation. The second component is the personnel attitude in al/ levels to respond and optimize those framework. (author)

  5. Notes on LED Installations in Street Illumination

    Directory of Open Access Journals (Sweden)

    Elisabeta Spunei

    2014-09-01

    Full Text Available The paper presents a study made on choosing LED street lighting installations, such that the quality requirements for exterior artificial lighting are fulfilled. We analyze two types of LED street lighting installations from a technical point of view, together with lighting level and brightness values obtained during the measurements. Following on the field measurements, the lighting quality parameters are calculated, and, for the lighting installation with the best performance, optimal mounting suggestions are made. The optimal quality parameters are calculated by simulations using the Dialux software. The same software and the same light sources we also compute an optimal street lighting by determining the size of the installation that provides the best lighting parameter values.

  6. Status of the ELIMED multidisciplinary and medical beam-line at ELI-Beamlines

    International Nuclear Information System (INIS)

    Romano, F; Cirrone, G A P; Cuttone, G; Schillaci, F; Scuderi, V; Amico, A; Candiano, G; Larosa, G; Leanza, R; Manna, R; Marchese, V; Milluzzo, G; Petringa, G; Pipek, J; Giordanengo, S; Guarachi, L F; Marchetto, F; Sacchi, R; Korn, G; Margarone, D

    2017-01-01

    Nowadays, one of the biggest challenges consists in using high intensity laser-target interaction to generate high-energy ions for medical purposes, eventually replacing the old paradigm of acceleration characterized by huge and complex machines. In order to investigate the feasibility of using laser-driven ion beams for multidisciplinary application, a dedicated beam transport line will be installed at the ELI-Beamlines facility in Prague (CZ), as a part of the User-oriented ELIMAIA beam-line dedicated to ion acceleration and their potential applications. The beam-line section dedicated to transport and dosimetric endpoints is called ELIMED (ELI-Beamlines MEDical and multidisciplinary applications) and will be developed by the INFN-LNS. (paper)

  7. [The hygienic characteristics of the medical technology accompaniment to the development, creation and operation of installations equipped with video display terminals].

    Science.gov (United States)

    Prygun, A V; Lazarev, N V

    1998-10-01

    Radiation measuring on the work places of operators in command and control installations proved that environment parameters depending on electronic display functioning are in line with the regulations' requirements. Nevertheless the operator health estimates show that the problem of personnel security still exists. The authors recommend some measures to improve the situation.

  8. Civilian protection and Britain's commercial nuclear installations

    International Nuclear Information System (INIS)

    1981-01-01

    The subject is treated as follows: initial conclusions (major nuclear attack on military installations; nuclear attack including civil nuclear targets; conventional attack on civil nuclear installations); nature of nuclear weapons explosions and power reactor releases (general; dose effects and biologically significant isotopes; nuclear weapon effects; effect of reactors and other fuel-cycle installations in a thermonuclear area; implications of reactor releases due to conventional attack, sabotage, civil disorder or major accident). (U.K.)

  9. 14 CFR 25.1703 - Function and installation: EWIS.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...

  10. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  11. Hydro-Quebec line crew returns home from Haiti

    Energy Technology Data Exchange (ETDEWEB)

    Horne, D.

    2005-04-01

    This article recounted the experience of a 14-member Hydro-Quebec line crew and support group that travelled to Haiti in November 2004 to help re-establish essential electricity services. The work was conducted together with Electricite d'Haiti (EDH). The team installed 400 poles, 10 km of conductors and 85 transformers, restoring service to water pumps; La Providence and Raboteau hospitals; a centre housing Doctors without borders; a CARE distribution centre; and several convents and schools. The installation of street lights at strategic points allowed lighting to be restored in several districts of Gonaives. Hydro-Quebec was able to extend their mission to Haiti and purchase more poles and transformers with the help of a $500,000 contribution from the Canadian International Development Agency. Hydro-Quebec was the only company who came to the aid of EDH. The total budget for the project was $4 million. 2 figs.

  12. Effect of distributed generation installation on power loss using genetic algorithm method

    Science.gov (United States)

    Hasibuan, A.; Masri, S.; Othman, W. A. F. W. B.

    2018-02-01

    Injection of the generator distributed in the distribution network can affect the power system significantly. The effect that occurs depends on the allocation of DG on each part of the distribution network. Implementation of this approach has been made to the IEEE 30 bus standard and shows the optimum location and size of the DG which shows a decrease in power losses in the system. This paper aims to show the impact of distributed generation on the distribution system losses. The main purpose of installing DG on a distribution system is to reduce power losses on the power system.Some problems in power systems that can be solved with the installation of DG, one of which will be explored in the use of DG in this study is to reduce the power loss in the transmission line. Simulation results from case studies on the IEEE 30 bus standard system show that the system power loss decreased from 5.7781 MW to 1,5757 MW or just 27,27%. The simulated DG is injected to the bus with the lowest voltage drop on the bus number 8.

  13. Risk assessment techniques for industrial installations

    International Nuclear Information System (INIS)

    Croitoru, C.; Dumitrescu, M.; Preda, I.; Stefanescu, I.; Titescu, G.

    1995-01-01

    This paper presents a risk analysis which concerns the following stages: identification of the initiation events, evaluation of the occurrence frequency of different accident sequences, assessment of human, economical, and environmental consequences, risk assessment and management. The study of the accident sequences subsequent to an initiation event was achieved by the event tree method. Also, there were developed methods based on mathematical models of installations which take into account reliability data, data concerning the exploitation history, and data referring to the human factor effects in the installation operation. These methods were used for the determination of occurrence frequencies of hydrogen sulfide emission accidents in the heavy water production installations

  14. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P. [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines

  15. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines comprennent la seismicite

  16. Technical and economic data for overhead lines in high-voltage a. c. and d. c. transmission

    Energy Technology Data Exchange (ETDEWEB)

    1977-11-01

    For the study of 'High-power electricity transmission and distribution in densely populated areas' technical and economic data were compiled for high-voltage alternating current and direct current transmission. A modification of the overhead lines for transmitting higher powers is possible as required by means of higher rated transmission voltages, larger conductor cross-sections and a larger number of circuits installed on each mast. For the use of larger partial conductor cross-sections and of bundle conductors with more than 4 partial conductors, and also to use voltages higher than 380 kV, development work is requisite from the points of view of construction, installation, insulators and fittings. Further possible developments result from the use of new materials such as plastic insulators which make possible the use of more versatile shapes for application in heavy pollution, particulary for direct current overhead lines. By using insulating crossarms the width of path can be considerably reduced. Economic efficiency investigations show even today higher cost for such techniques compared with lines of earlier construction.

  17. Installation of beam screens in LHC arc cryomagnets

    CERN Document Server

    Cruikshank, P; Schneider, G; Veness, R J M

    1999-01-01

    Beam screens will be installed in the cold bores of the LHC arc cryodipoles and Short Straight Sections (SSS). This note describes the constraints on the beam screen installation imposed by the beam vacuum interconnects and Beam Position Monitors (BPM), and explains the installation scenario which has been adopted.

  18. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site

  19. Installation Service - Changes in opening hours

    CERN Multimedia

    GS Department

    2010-01-01

    For organizational matters, please note that, as from 15 March 2010, the Installation Service will have wen opening hours. The new schedule will be from 14:00 to 17:00 (Monday to Friday). Contact persons are: Martine Briant, Karine Robert and Claudia Bruggmann. The office address remains 73-3-014. Installation Service

  20. 800 kW transmission line research at Leatherhead

    Energy Technology Data Exchange (ETDEWEB)

    1964-05-29

    The experimental transmission line was installed at Leatherhead to enable the Central Electricity Research Laboratories to study the insulators, fittings, and conductors likely to be needed for ac power transmission at voltages up to the equivalent of 800 kV three-phase. Continuous recording will be made of corona power loss and radio and television interference. For this purpose C.E.R.L. has developed a statistical radio-interference recorder. The instrumentation also includes an automatic corona-loss bridge and data logger.

  1. Update of the database of photovoltaic installations in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.; Bruhns, H.

    1999-07-01

    The article describes an updated database of photovoltaic (PV) installations in the UK. The database contains more than 300 records representing over 40,000 photovoltaic installations with more than 100 buildings that use photovoltaic arrays. Figures show: (i) a chart of cumulative PV applications to date; (ii) a chart of cumulative installations in the database; (iii) the growth of Building Integrated PV installed to date; (iv) the cumulative growth of peak power of PV for buildings installed every year since 1985; (v) the distribution by application of all PV installations in the database and (vi) the various applications of PV installations.

  2. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  3. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    Science.gov (United States)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  4. Installation of an isotope separator in Debrecen

    International Nuclear Information System (INIS)

    Gacsi, Z.; Gulyas, J.; Vitez, A.; Csige, L.; Krasznahorkay, A.

    2005-01-01

    Complete text of publication follows. An isotope separator named OSIRIS was decommissioned in Studsvik, Sweden last July. Researchers there offered this equipment to us for dismantling and moving it over to ATOMKI in Debrecen for installation at the cyclotron lab and save and use it in nuclear physics and other sciences where stable and radioactive isotopes are used extensively for fundamental and applied research. Since the separator was used to separate radioactive isotopes, the ion source with its beam extracting, shaping, and transporting accessories, as well as the lining inside the bending magnet, furthermore the beam diagnostic and shaping elements in the 'switchyard' part of the separator had to stay in Studsvik because of the high radioactive contamination. In order to operate this equipment, first we have to design and manufacture these parts together with a new endstation for the collection and handling of the separated isotopes. Parallel with the installation, we also concentrate on different applications of an isotope separator, including separation of stable isotopes for labelling special compounds used in many branches of sciences, medical care, and industry, and on studying single ion implantation possibilities, as well as on the production of special targets for nuclear physics research. First we want to separate stable isotopes, and then, when we overcome all technical pitfalls, we will consider using this equipment to separate radioactive isotopes as well. Our intention is to have this equipment available to anyone at ATOMKI and elsewhere interested in using its capabilities in their own research fields. Consequently, all comments, suggestion, and ideas are welcome now and continuously, since the design and manufacture of parts can then be oriented by taking into account all the suggestions as much as possible. (author)

  5. 46 CFR 119.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... an exhaust pipe. (b) Exhaust gas must not leak from the piping or any connections. The piping must be...

  6. 30 CFR 57.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or... wiring. ...

  7. Static design of steel-concrete lining for traffic tunnels

    Science.gov (United States)

    Vojtasik, Karel; Mohyla, Marek; Hrubesova, Eva

    2017-09-01

    Article summarizes the results of research focused on the structural design of traffic tunnel linings that have been achieved in the framework of a research project TE01020168 that supports The Technology Agency of Czech Republic. This research aim is to find and develop a process for design structure parameters of tunnel linings. These are now mostly build up by a shotcrete technology. The shotcrete is commonly endorsed either with steel girders or steel fibres. Since the installation a lining structure is loaded while strength and deformational parameters of shotcrete start to rise till the setting time elapses. That’s reason why conventional approaches of reinforced concrete are not suitable. As well as there are other circumstances to step in shown in this article. Problem is solved by 3D analysis using numerical model that takes into account all the significant features of a tunnel lining construction process inclusive the interaction between lining structure with rock massive. Analysis output is a view into development of stress-strain state in respective construction parts of tunnel lining the whole structure around, including impact on stability of rock massive. The proposed method comprises all features involved in tunnel fabrication including geotechnics and construction technologies.

  8. Installations of SNCR on bark-fired boilers

    International Nuclear Information System (INIS)

    Hjalmarsson, A.K.; Hedin, K.; Andersson, Lars

    1997-01-01

    Experience has been collected from the twelve bark-fired boilers in Sweden with selective non catalytic reduction (SNCR) installations to reduce emissions of nitrogen oxides. Most of the boilers have slope grates, but there are also two boilers with cyclone ovens and two fluidized bed boilers. In addition to oil there are also possibilities to burn other fuel types in most boilers, such as sludge from different parts of the pulp and paper mills, saw dust and wood chips. The SNCR installations seems in general to be of simple design. In most installations the injection nozzles are located in existing holes in the boiler walls. The availability is reported to be good from several of the SNCR installations. There has been tube leakage in several boilers. The urea system has resulted in corrosion and in clogging of one oil burner. This incident has resulted in a decision not to use SNCR system with the present design of the system. The fuel has also caused operational problems with the SNCR system in several of the installations due to variations in the moisture content and often high moisture content in bark and sludge, causing temperature variations. The availability is presented to be high for the SNCR system at several of the plants, in two of them about 90 %. The results in NO x reduction vary between the installations depending on boiler, fuel and operation. The emissions are between 45 and 100 mg NO 2 /MJ fuel input and the NO x reduction rates are in most installations between 30 and 40 %, the lowest 20 and the highest 70 %. 13 figs, 3 tabs

  9. The Swiss nuclear installations annual report 1992

    International Nuclear Information System (INIS)

    1993-06-01

    This report concerns the safety of the Swiss nuclear installations in the period of 1992. Surveillance of these installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). In Switzerland five nuclear power plants are operational: Beznau I and II, Muehleberg, Goesgen and Leibstadt. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basle. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut down experimental reactor of Lucens, the exploration in Switzerland of final disposal facilities for radwaste and the interim radwaste storage facilities. The present report first deals with the nuclear power plants and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK (chapters 1-4). In chapter 5, the corresponding information is given for the research installations. Chapter 6 on radwaste disposal is dedicated to the waste treatment, waste from reprocessing, interim storage and exploration by the NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' vicinity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into some general questions relating to the safety of nuclear installations, and in particular covers important events in nuclear installations abroad. In all, the operation of the Swiss nuclear installations in the period of 1992 is rated safe by HSK. (author) 7 figs., 13 tabs

  10. Operational experience with the GEM detector assembly lines for the CMS forward muon upgrade

    CERN Document Server

    Vai, Ilaria

    2017-01-01

    The CMS Collaboration has been developing large-area Triple-GEM detectors to be installed in the muon endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the HL-LHC. Ten pre-production detectors were built at CERN to commission the first assembly line and the quality controls. These were installed in the CMS detector in early 2017 and are currently participating in the 2017 LHC run. The collaboration has prepared several additional assembly and quality control lines for distributed mass production of 160 GEM detectors at various sites worldwide. During 2017, these additional production sites have been optimizing construction techniques and quality control procedures and validating them against common specifications by constructing additional pre-production detectors. Using the specific experience from one production site as an example, we discuss how the quality controls make use of independent hardware and trained personnel to ensure fast and reliable pro...

  11. Total productive maintenance on example of automated foundry lines

    Directory of Open Access Journals (Sweden)

    S. Kukla

    2009-07-01

    Full Text Available Within framework of the presented study one has performed analysis of stoppages in automatic foundry lines operation, and basing on assumptions from complex maintenance system has undertaken himself to develop a service maintenance schedule for machinery installed in the line. Moreover, one has presented general assumptions of TPM system operated in conditions of series and multi-series production of cast iron castings. One has constructed operational database and has elaborated a list of line stoppage causes within a year. One has proposed a possibility of implementation of manufacturing systems modeling and simulating technique in management of production machinery operation in a foundry shop. Within framework of the simulation experiment one has developed schedules of production, schedules of maintenance and has forecasted indices of general productivity of the machinery for a various scenarios of events on example of casting line having in-series structure of operational reliability. In course of the study there was implemented ARENA universal software package to modeling and simulation of the manufacturing systems.

  12. 562,3 MWP installed in european union

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    In the end, the growth problems that were announced for the European photovoltaic market did not happen. With 170 MWp of additional capacity installed in the European Union 2003 has marked a new record high in installations bringing European installed capacity up to the neighbourhood of 562 MWp. While this sector's expansion has been remarkable (+ 43.4 % with respect to 2002), a lot of questions still remain with respect to the true will of certain countries to develop this form of energy. (author)

  13. Development of a Density Sensor for In-Line Real-Time Process Control and Monitoring of Slurries during Radioactive Waste Retrieval and Transport Operations at DOE Sites

    International Nuclear Information System (INIS)

    Bamberger, Judith A.; Greenwood, Margaret S.

    2000-01-01

    A density sensor (densimeter) to monitor and control slurries in-line real-time during radioactive waste retrieval and transport and detect conditions leading to degraded transport and line plugging is described. Benefits over baseline grab samples and off line analysis include: early detection and prevention of pipeline plugging, real-time density through the transfer process, elimination of grab sampling and off-line analysis, and reduced worker radiation exposure. The sensor is small, robust and could be retrofitted into existing pump pit manifolds and transfer lines. The probe uses ultrasonic signal reflection at the fluid-pipe wall interface to quantify density and features include: a non-intrusive sensing surface located flush with the pipeline wall; performance that is not affected by entrained air or by electromagnetic noise from nearby pumps and other equipment and is compact. Components were tested for chemical and radiation resistance and the spool piece was pressure tested in accordance with ASME Process Piping Code B31.3 and approved by the Hanford Site Flammable Gas Equipment Advisory Board for installation. During pipeline tests, the sensor predicted density within+ 2% oriented in vertical and horizontal position. The densimeter is installed in the modified process manifold that is installed in the prefabricated pump pit at Hanford tank SY-101 site. In FY-2002 the density sensor performance will be evaluated during transfers of both water and waste through the pipeline. A separate project developed an ultrasonic sensor that: (1) can be attached permanently to a pipeline wall, possibly as a spool piece inserted into the line or (2) can clamp onto an existing pipeline wall and be movable to another location. This method is attractive for radioactive fluids transport applications because the sensors could be applied to existing equipment without the need to penetrate the pipe pressure boundary or to open the system to install new equipment

  14. Evaluation of Installation Time for SMASHmount by SMASHsolar

    Energy Technology Data Exchange (ETDEWEB)

    2017-04-05

    The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewable Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.

  15. Update of the Linac4-PSB Transfer Line

    CERN Document Server

    HEIN, Lutz

    2010-01-01

    The installation of Linac4 represents the first step of the upgrade plans of the CERN accelerator complex for the future in order to raise the available proton flux to attain amongst others the LHC ultimate luminosity. This linac is capable to accelerate H--ions from 45keV to 160MeV, which will be injected into the Proton Synchrotron Booster (PSB). The increase of energy from 50MeV (Linac2) to 160MeV (Linac4) allows to overcome the space charge limitations at the PSB injection, which is the main bottleneck towards higher beam brightness in the downstream accelerator chain. In order to preserve beam quality from the outlet of Linac4 to PSB injection the design of the transfer line becomes crucial. As the location of Linac4 was chosen in view of upgrade scenarios, the construction of a new transfer line is foreseen, see ref.[1] and ref.[2]. Here part of the Linac2-PSB transfer line will be re-used. In the new part of the transfer line the beam is horizontally and vertically adjusted towards the bending magnet B...

  16. ITER PF6 double pancakes winding line

    Energy Technology Data Exchange (ETDEWEB)

    Du, Shuangsong [Institute of Plasma Physics, Chinese Academy of Science, Hefei (China); University of Science and Technology of China, Hefei (China); Wen, Wei, E-mail: wenwei@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Science, Hefei (China); Chen, Jin; Wu, Weiyue; Song, Yuntao; Shen, Guang [Institute of Plasma Physics, Chinese Academy of Science, Hefei (China)

    2017-03-15

    Highlights: • ITER PF6 double pancakes “two-in-hand” winding line layout and main parameters were introduced, main winding sequences were also included. • Main features of each winding unit include de-spooling unit, straightening unit, sandblasting and cleaning unit, bending unit, turn insulation wrapping head, rotary table and automatic control system were depicted. • PF6 double pancake winding line was commissioned with PF5 empty jacket conductor after the installation and testing of each unit, ±0.5 mm turn positioning and ±2 turn to turn deviations were achieved. - Abstract: The Poloidal Field (PF) coils are one of the main sub-systems of the ITER magnets. The PF6 coil is being manufactured by the Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP) as per the Poloidal Field coils cooperation agreement signed between ASIPP and Fusion for Energy (F4E).The ITER PF6 winding pack is composed by stacking of 9 double pancakes. Each double pancake is wound with a “two-in-hand” configuration. This paper describes the ITER PF6 double pancakes winding line, including layout and main parameters of the winding line, features of main units and the commissioning trial with PF5 empty jacket conductor.

  17. Canberra Alpha Sentry Installation Functional Design Criteria (FDC)

    International Nuclear Information System (INIS)

    WHITE, W.F.

    1999-01-01

    This document provides the functional design criteria for the installation of the Canberra Alpha Sentry System at selected locations within the Plutonium Finishing Plant (PFP). The equipment being installed is identified by part number in Section 3 and the locations are given in Section 5. The design, procurement and installation are assigned to Fluor Federal Services

  18. An earth anchor system: installation and design guide.

    Science.gov (United States)

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  19. Beam position monitoring in the AGS Linac to Booster transfer line

    International Nuclear Information System (INIS)

    Shea, T.J.; Brodowski, J.; Witkover, R.

    1991-01-01

    A beam position monitor system has been developed and used in the commissioning of Brookhaven's Linac to Booster transfer line. This line transports a chopped, RF modulated H- beam from the 200 MeV Linac to the AGS Booster. Over a 15dB dynamic range in beam current, the position monitor system provides a real-time, normalized position signal with an analog bandwidth of about 20 MHz. Seven directional coupler style pickups are installed in the line with each pickup sensing both horizontal and vertical position. Analog processing electronics are located in the tunnel and incorporate the amplitude modulation to phase modulation normalization technique. To avoid interference from the 200 MHz linac RF system, processing is performed at 400 MHz. This paper provides a system overview and report results from the commissioning experience

  20. Comparative study of aerial transmission lines and underground isolated on gas

    International Nuclear Information System (INIS)

    Quesada Jimenez, Marco Esteban

    2012-01-01

    A comparison was made of aerial power lines and underground isolated on gas. Growing electric demand has given way to debate the lines transmission. Multiple discussions have generated about its application, however, the energy must be supplied and this process leads to the search for more efficient methods. The theory has covered the most important design criteria of the airlines and an introduction to the little known transport lines isolated on gas. The process of manufacturing, installation and operation are studied within the scope of the project. Count information is included in the main aspects of calculation relating to power transmission. Besides, the planning of the optimal route nominal calculations, load flow and power losses are focused as well as magnetic field strengths and finally economic analysis. (author) [es

  1. The Local Helium Compound Transfer Lines for the Large Hadron Collider Cryogenic System

    CERN Document Server

    Parente, C; Munday, A; Wiggins, P

    2006-01-01

    The cryogenic system for the Large Hadron Collider (LHC) under construction at CERN will include twelve new local helium transfer lines distributed among five LHC points in underground caverns. These lines, being manufactured and installed by industry, will connect the cold boxes of the 4.5-K refrigerators and the 1.8-K refrigeration units to the cryogenic interconnection boxes. The lines have a maximum of 30-m length and may possess either small or large re-distribution units to allow connection to the interface ports. Due to space restrictions the lines may have complex routings and require several elbowed sections. The lines consist of a vacuum jacket, a thermal shield and either three or four helium process pipes. Specific internal and external supporting and compensation systems were designed for each line to allow for thermal contraction of the process pipes (or vacuum jacket, in case of a break in the insulation vacuum) and to minimise the forces applied to the interface equipment. Whenever possible, f...

  2. The Thin Green Line: An Assessment of DoD’s Readiness and Environmental Protection Initiative to Buffer Installation Encroachment

    Science.gov (United States)

    2007-01-01

    degraded natural ecosys- tems so much that few wild bees are left. Farmers who relied on wild bees for pollination must now rent bees commercially...around military installations, noise and air pollution, endangered species and critical habitat, wetlands , water quality and supply, cultural resources...encroachment issues:1 noise pollution endangered species and critical habitat wetlands water quality and supply air pollution and quality cultural

  3. New technique for landfill leachate well installation

    International Nuclear Information System (INIS)

    Hornsby, R.G.; Miller, M.S.

    1991-01-01

    The installation method fulfilled our expectations. The entire well installation took eight writing days to complete, for an average of two wells per day. It met our Health and Safety, waste volume, environmental risk and uniform sandpack expectations. Health and Safety concerns were minimal. We found that virtually all work could be completed using Level D protection. The volume of waste produced by the well installation was extremely low. The core samples and casing scrapings were the only well installation wastes directly produced. The waste containers which required sampling prior to disposal were: Decontaminated water (330 gallons), Personnel protective equipment and water (715 gallons), Soil cores (25 gallons), Land leachate (440 gallons). Each waste type was sampled and submitted to a laboratory for analyses of full Appendix 3 plus U.S. EPA toxicity parameters. The results verified that all of the wastes could be disposed of on-site. Since the only drilling wastes were the clay core samples and the very small amount of material adhering to the casing, contamination of the new clay cap did not occur. A uniform sandpack was guaranteed through the use of a presanded well screen. The loose sand added when the casing was removed served to fill any voids. All the leachate wells have water in them, and it appears that they will function adequately. We are in the process of constructing a treatment and storage facility to manage the liquids to be extracted for off-site disposal. The long-term effectiveness of the wells will be quantified. This well installation method should be considered in situations requiring the following: expedited installation; reduced Health and Safety concerns; reduced disposal costs; reduced potential for adverse environmental impact; and comparable installation costs. The choice of this method must include considerations of the subsurface geology and the nature of any manmade materials

  4. Safety of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    In accordance with the Nuclear Energy Act, a Licence may only be issued if the precautions required by the state of the art have been taken to prevent damage resulting from the construction and operation of the installation. The maximum admissible body doses in the area around the installation which must be observed in planning constructional and other technical protective measures to counter accidents in or at a nuclear power station (accident planning values, are established). According to the Radiological Protection Ordinance the Licensing Authority can consider these precautions to have been taken if, in designing the installation against accidents, the applicant has assumed the accidents which, according to the Safety Criteria and Guidelines for Nuclear Power Stations published in the Federal Register by the Federal Minister of the Interior after hearing the competent senior state authorities, must determine the design of a nuclear power station. On the basis of previous experience from safety analysis, assessment and operation of nuclear power stations, the accident guidelines published here define which accidents are determinative for the safety-related design of PWR power stations and what verification -particularly with regard to compliance with the accident planning values of the Radiological Protection Ordinance -must be provided by the applicant. (author)

  5. Department of the Army Installation Restoration Program

    International Nuclear Information System (INIS)

    Anderson, A.W.

    1988-01-01

    The Army's Installation Restoration Program (IRP) was established in 1975 in response to regulatory action at several installations where past disposal practices had caused contamination of streams and groundwater. The need to decontaminate excess Army-owned real estate also was considered in early IRP activities. A variety of site types have been discovered on Army installations. The major site types evaluated to date include: contaminated soil areas, landfills, lagoons, buildings, burning grounds, sumps, pits, storage tanks, sewage treatment plants, storage pads, industrial wastewater treatment plants, and salvage yards. Twenty Army installations have been proposed for or listed on the National Priorities List (NPL). The need for taking action at hazardous waste sites, however, is based on threats they pose to human health, welfare or the environment. Sites do not have to be on the SPL in order to be cleaned up through IRP activities. All of the sites that caused Army installations to be proposed for the NPL are being evaluated and cleaned up. In addition, all Army properties have been or will be assessed and where needed they will be addressed by the IRP

  6. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  7. Utilizing Facebook and Automated Telephone Calls to Increase Adoption of a Local Smoke Alarm Installation Program.

    Science.gov (United States)

    Frattaroli, Shannon; Schulman, Eric; McDonald, Eileen M; Omaki, Elise C; Shields, Wendy C; Jones, Vanya; Brewer, William

    2018-05-17

    Innovative strategies are needed to improve the prevalence of working smoke alarms in homes. To our knowledge, this is the first study to report on the effectiveness of Facebook advertising and automated telephone calls as population-level strategies to encourage an injury prevention behavior. We examine the effectiveness of Facebook advertising and automated telephone calls as strategies to enroll individuals in Baltimore City's Fire Department's free smoke alarm installation program. We directed our advertising efforts toward Facebook users eligible for the Baltimore City Fire Department's free smoke alarm installation program and all homes with a residential phone line included in Baltimore City's automated call system. The Facebook campaign targeted Baltimore City residents 18 years of age and older. In total, an estimated 300 000 Facebook users met the eligibility criteria. Facebook advertisements were delivered to users' desktop and mobile device newsfeeds. A prerecorded message was sent to all residential landlines listed in the city's automated call system. By the end of the campaign, the 3 advertisements generated 456 666 impressions reaching 130 264 Facebook users. Of the users reached, 4367 individuals (1.3%) clicked the advertisement. The automated call system included approximately 90 000 residential phone numbers. Participants attributed 25 smoke alarm installation requests to Facebook and 458 to the automated call. Facebook advertisements are a novel approach to promoting smoke alarms and appear to be effective in exposing individuals to injury prevention messages. However, converting Facebook message recipients to users of a smoke alarm installation program occurred infrequently in this study. Residents who participated in the smoke alarm installation program were more likely to cite the automated call as the impetus for their participation. Additional research is needed to understand the circumstances and strategies to effectively use the social

  8. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  9. Performance of cooling installation for cyclotron Decy-13

    International Nuclear Information System (INIS)

    Edi Trijono Budisantoso; Suprapto; Sutadi

    2015-01-01

    Has been calculated the cooling installation performance of Decy-13 cyclotron. The cooling installation is analysed based on the technical specifications of each cooling component to proof the results of the design and implementation of installations meet the cooling requirement. Analysis of loss of pressure and flow rate in the piping installation is done empirically using Hazen-Williams equation while the analysis of heat transfer processes in the cooling tower is done using the help of psychometric charts that available. Cooling component consists of a condenser and associated piping systems with cooling towers and equipped with a pump to push the circulation of cooling. The calculations show that the installation of the condenser cooler uses the cooling tower LiangChi LBC-30 with a booster pump Grundfos 4 kW NF30-36T powered 47kW able to transfer heat with the coolant flow rate 136 lpm, input to output coolant pressure difference 2.1atm and the cooling temperature difference 5 °C. Conclusion of the calculation is the technical specifications of cooling components and installation already meets the needs of the cooling expected. (author)

  10. Installing Ubuntu Enterprise Cloud in a Physical Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to “Guidelines for Building a Private Cloud Infrastructure.” This supplemental material provides guidance on how to install Ubuntu Enterprise Cloud in a physical environment. The purpose of this document is to provide a practical, step......-by-step, detailed guide on how to pre-configure and install the machines and network. For more detailed description of the steps, a reader is advised to refer to another supplemental book named “Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment.” There are a few more details, accompanied...... with screenshots. The material included in this supplemental document is based on the installation that was performed in a physical environment based on HP ProLiant DL380 G4 servers, 100 Mbit/s witches, and a firewall/router that isolated the whole solution. The cloud installation was performed using the (for...

  11. Installation and Preliminary Test of the Ion Accelerator for the Surface Analysis at KOMAC

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Il; Ahn, Tae Sung; Seo, Dong Hyuk; Kwon, Hyeok Jung; Kim, Cho Rong; Park, Jun Kue; Cho, Yong Sub [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    An electrostatic tandem accelerator, which had been operating over 25 years at KIGAM (Korea Institute of Geoscience and Mineral Resources), is moved to KOMAC (Korea Multi-purpose Accelerator Complex) last year. For the purpose of supplying the qualified and quantified data from the irradiated species as part of the user service of KOMAC. The accelerator is a pelletron with tandem type. The ion accelerator for surface analysis was moved at KOMAC last year. The installation with alignment was done. The conditioning of high voltage was operated up to 1.7 MV. The beam transmission to PIXE beam line was achieved as 51%.

  12. Installation of an accelerator from theory to practice

    CERN Document Server

    Foraz, K; Weisz, S; CERN. Geneva. TS Department

    2004-01-01

    The size and complexity of the LHC project at CERN calls for a strong co-ordination of all installation activities. The detailed installation planning has to take into account many constraints such as the component production rates, the installation contracts or the transport and handling requirements in a narrow tunnel with limited access points. The planning also needs to be flexible enough to cope with aleas that are unavoidable in such a large project that spans over many years. This paper describes the follow-up methodology, both in the field and in the office, adopted by the IC team to assist the groups involved in the installation of the LHC machine.

  13. Full Scale Experimental Study on the Air Insulation of 765kV Transmission Lines

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Boo; Shin, Jeong Woon; Cho, Sung Bae; Chang, Sung Chil; Kwak, Joo Shik [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Kim, Ik Soo; Lee, Heyoung Ho; Kang, Young Sik; Lee, Hong Sik; Choi, Beyoung Joo; Kim, Young Bae [Korea Electrotechnology Research Institute, Changwon (Korea, Republic of)

    1997-12-31

    Design and construction of testing yard. Technical specification of impulse voltage generator which was installed in testing yard. Corrosion and statistical analysis of test data. Test object setup and test results of flashover characteristic in various paths. Recommended optimum air clearance of 765kV transmission lines. (author). 163 refs., figs.

  14. Entropy and Digital Installation

    Directory of Open Access Journals (Sweden)

    Susan Ballard

    2005-01-01

    Full Text Available This paper examines entropy as a process which introduces ideas of distributed materiality to digital installation. Beginning from an analysis of entropy as both force and probability measure within information theory and it’s extension in Ruldof Arnheim’s text ‘Entropy and Art” it develops an argument for the positive rather thannegative forces of entropy. The paper centres on a discussion of two recent works by New Zealand artists Ronnie van Hout (“On the Run”, Wellington City Gallery, NZ, 2004 and Alex Monteith (“Invisible Cities”, Physics Room Contemporary Art Space, Christchurch, NZ, 2004. Ballard suggests that entropy, rather than being a hindrance to understanding or a random chaotic force, discloses a necessary and material politics of noise present in digital installation.

  15. Installation and experimental uses of RTNS-I at the University of California, Berkeley

    International Nuclear Information System (INIS)

    Belian, A.P.; Morse, E.C.; Tobin, M.

    1996-01-01

    The National Ignition Facility (NIF) features optical components with line-of-sight access to the 14 MeV neutrons generated by fusion reactions in the target. Two of these components are a final focusing lens, made of fused silica, and a frequency conversion crystal comprised of two potassium dihydrogen phosphate (KDP) crystals. The Rotating Target Neutron Source (RTNS-I), which was previously operated at Lawrence Livermore National Laboratory (LLNL), has now been re-installed at UC Berkeley and is being used for the studies of neutron irradiation of fused silica and KDP. The machine has been installed so as to re-utilize the concrete structure that once housed the Berkeley Research Reactor, now decommissioned. The RTNS uses a 2 - 5 mA beam of deuterons impinging upon a spinning internally cooled tritiated copper target with a 110 Ci tritium inventory. Maximum beam energy is 399 KeV. The 14 MeV neutron production rate is 1.0x10 12 n/sec. Some new features of the machine include fiber-optic coupled microprocessor control of accelerator parameters, a cryogenic tritium collection system, and a scrubber system for exhaust tritium management. 15 refs., 4 figs

  16. SICS. A Sensor-Based In-Line Control System for the Surfaces of Continuously Cast Slabs

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Tzyy-Shuh [OG Technologies, Inc., Ann Arbor, MI (United States)

    2013-09-23

    The Phase II project has been carried out in accordance to the proposed tasks and budget, based on the original and extended schedule. The R&D team designed and implemented the test unit for the full width coverage, installed the unit in a caster. The development work further included enhanced image processing, in-depth defect study and process control models. The function, operation, and maintenance of the SICS was thoroughly studied during the Phase II research. The experience indicates additional hardware and procedures are required to make the SICS a commercially ready product in operation and maintenance aspect. Such developments have been finished and the team is contacting potential customers for the first commercial installation of SICS. Additionally, OGT is exploring the possibility to team up with a US company that specializes in surface cleaning for slabs/blooms/billets such that the in-line surface inspection can be integrated with in-line surface clean up for the maximum benefit to the steel industry.

  17. Offshore wind transport and installation vessel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The initial objective of the project was to complete a feasibility study to determine the viability of an innovative transportation vessel to be deployed in the installation of offshore wind farms. This included the feasibility of providing a stable-working platform that can be used in harsh offshore environments. A study of current installation contractors and their installation equipment was used to provide a preliminary specification for the installation vessel. A typical barge was selected and a number of hydrodynamic analyses were carried out in order to establish it's on course and operational stability. The analysis proved the stability of the vessel during operation was critical and that in order to utilise the crane's full potential a stabilisation system must be employed. The main aim of the work to date was to establish whether it was feasible to use a stabilisation system on the installation vessel. The spud leg FEED study established that it was feasible to use spud legs to stabilise the vessel. In order to achieve the degree of stability required it is necessary to lift the vessel completely out of the water. This was not the original aim of the study but due to the external loads on the hull it was the only viable option. Lifting the vessel out of the water results in the legs and leg casings becoming very large. This has a number of consequences for the final design. Due to large loads on the legs spud cans must be used to avoid bottom penetration, the spud cans increase the draft of the vessel by 2m. The large loads require larger winches and more reeving to be used, this results in larger pumps and motors, all of which have to be housed. The stabilisation system has been proved to be feasible for a large installation vessel, the cost and physical size are however more excessive than first anticipated. (Author)

  18. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  19. Evaluation of the probability of arrester failure in a high-voltage transmission line using a Q learning artificial neural network model

    International Nuclear Information System (INIS)

    Ekonomou, L; Karampelas, P; Vita, V; Chatzarakis, G E

    2011-01-01

    One of the most popular methods of protecting high voltage transmission lines against lightning strikes and internal overvoltages is the use of arresters. The installation of arresters in high voltage transmission lines can prevent or even reduce the lines' failure rate. Several studies based on simulation tools have been presented in order to estimate the critical currents that exceed the arresters' rated energy stress and to specify the arresters' installation interval. In this work artificial intelligence, and more specifically a Q-learning artificial neural network (ANN) model, is addressed for evaluating the arresters' failure probability. The aims of the paper are to describe in detail the developed Q-learning ANN model and to compare the results obtained by its application in operating 150 kV Greek transmission lines with those produced using a simulation tool. The satisfactory and accurate results of the proposed ANN model can make it a valuable tool for designers of electrical power systems seeking more effective lightning protection, reducing operational costs and better continuity of service

  20. Evaluation of the probability of arrester failure in a high-voltage transmission line using a Q learning artificial neural network model

    Science.gov (United States)

    Ekonomou, L.; Karampelas, P.; Vita, V.; Chatzarakis, G. E.

    2011-04-01

    One of the most popular methods of protecting high voltage transmission lines against lightning strikes and internal overvoltages is the use of arresters. The installation of arresters in high voltage transmission lines can prevent or even reduce the lines' failure rate. Several studies based on simulation tools have been presented in order to estimate the critical currents that exceed the arresters' rated energy stress and to specify the arresters' installation interval. In this work artificial intelligence, and more specifically a Q-learning artificial neural network (ANN) model, is addressed for evaluating the arresters' failure probability. The aims of the paper are to describe in detail the developed Q-learning ANN model and to compare the results obtained by its application in operating 150 kV Greek transmission lines with those produced using a simulation tool. The satisfactory and accurate results of the proposed ANN model can make it a valuable tool for designers of electrical power systems seeking more effective lightning protection, reducing operational costs and better continuity of service.

  1. Demonstration of a utility industry horizontal drilling system: Horizontal well AMH-5 installation report

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of VOCs in soils and groundwater at the Savannah River Site (SRS) in 1989. The overall goal of the program is demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program. Directional drilling has been shown to be a successful technique for enhancing access to the subsurface, thus improving remediation systems, especially remediation systems which perform in situ. Demonstration of an innovative directional drilling system at the Integrated Demonstration Site at the SRS, was initiated in June of 1992. The directional drilling system was designed to install an in situ remediation system. The drilling system is an experimental compaction/dry drilling technique developed by Charles Machine Works (Ditch Witch reg-sign) of Perry, Oklahoma. A horizontal well was installed in the M Area of the SRS below and parallel to an abandoned tile process sewer line. The installation of the horizontal well was a two-part process. Part one consisted of drilling the borehole, and part two was the horizontal well completion

  2. 14 CFR 27.967 - Fuel tank installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 27.967 Section 27.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a...

  3. 14 CFR 29.967 - Fuel tank installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 29.967 Section 29.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.967 Fuel tank installation...

  4. 14 CFR 25.967 - Fuel tank installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installations. 25.967 Section 25.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations...

  5. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  6. Evaluation Of RSG-GAS Power Installed After 12 Years

    International Nuclear Information System (INIS)

    Mrsahala, Yan Bony

    2001-01-01

    The total power installed in RSG-GAS electric system less then 3 x 2500 KVA. Some of powers installed included are the never used loads, so the operationally total load installed that regularly operational and incidental are amount about 3700 KVA. In this condition, the capacity of power transformer installed 3 x 2500 KVA becomes larger. The influences of the numinous power are electric bill payment by RSG-GAS. The reduces power installed may be done as well as remember that some of the load not be operation so that the power consume for that facility could be cut off. The evaluation and calculation result gives some alternatively can be selected to minimize the electric bill payment

  7. An application of residual current protective device at electrical installation

    International Nuclear Information System (INIS)

    Firman Silitonga

    2008-01-01

    In an electrical installation, a protection for overload and short circuit are always to be installed. In addition to the installation, it is necessary to be installed a protection device for residual current because both the short circuit and the overload device protection will not work for the residual current. The quantity of the residual current must be defined first at any electrical installation to define an appropriate residual current protection so that not every residual current will break the circuit down. This paper will explain a method how to install a residual protection device for 3500 VA or more at TN and TT of earthing system. (author)

  8. Guide related to structure sanitation in basic nuclear installations. Guide Nr 14, Release of the 30 August 2016

    International Nuclear Information System (INIS)

    2016-01-01

    This guide defines recommendations made by the ASN regarding the sanitation methodology to be applied to buildings and structures of any basic nuclear installation. After a recall of the general doctrine for the management of wastes in basic nuclear installations, the guide presents the ASN doctrine for structure sanitation which distinguishes complete sanitation, extended sanitation, and sanitation in operation phase. It presents principles for the sanitation of component structures of an area of possible production of nuclear wastes. It indicates administrative procedures to be applied before and after sanitation works, notably when the radiological condition of structures has been made compatible or not with any use. After indication of requirements in terms of quality insurance, modalities of definition of defence lines (from first to fourth) are discussed. Requirements regarding the performance of sanitation operations are reviewed

  9. 30 CFR 77.212 - Draw-off tunnel ventilation fans; installation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Draw-off tunnel ventilation fans; installation... UNDERGROUND COAL MINES Surface Installations § 77.212 Draw-off tunnel ventilation fans; installation. When fans are used to ventilate draw-off tunnels the fans shall be: (a) Installed on the surface; (b...

  10. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  11. The ATLAS software installation system for LCG/EGEE

    Energy Technology Data Exchange (ETDEWEB)

    Salvo, A D [Istituto Nazionale di Fisica Nucleare, sez. Roma 1 (Italy); Barchiesi, A [Universita di Roma I ' La Sapienza' (Italy); Gnanvo, K [Queen Mary and Westfield College (United Kingdom); Gwilliam, C [University of Liverpool (United Kingdom); Kennedy, J; Krobath, G [Ludwig-Maximilians-Universitaet Muenchen (Germany); Olszewski, A [Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences (Poland); Rybkine, G [Royal Holloway College (United Kingdom)

    2008-07-15

    The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within a few hours, have driven the need for an automatic installation system for the LHC experiments. In this work we describe the ATLAS system for the experiment software installation in LCG/EGEE, based on the Light Job Submission Framework for Installation (LJSFi), an independent job submission framework for generic submission and job tracking in EGEE. LJSFi is able to automatically discover, check, install, test and tag the full set of resources made available in LCG/EGEE to the ATLAS Virtual Organization in a few hours, depending on the site availability.

  12. 16 CFR 460.17 - What installers must tell their customers.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false What installers must tell their customers... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all...

  13. Evaluation of ATLAS 100% DVI Line Break Using TRACE Code

    International Nuclear Information System (INIS)

    Huh, Byung Gil; Bang, Young Seok; Cheong, Ae Ju; Woo, Sweng Woong

    2011-01-01

    ATLAS (Advanced Thermal-Hydraulic Test Loop for Accident Simulation) is an integral effect test facility in KAERI. It had installed completely to simulate the accident for the OPR1000 and the APR1400 in 2005. After then, several tests for LBLOCA, DVI line break have been performed successfully to resolve the safety issues of the APR1400. Especially, a DVI line break is considered as another spectrum among the SBLOCAs in APR1400 because the DVI line is directly connected to the reactor vessel and the thermal hydraulic behaviors are expected to be different from those for the cold leg injection. However, there are not enough experimental data for the DVI line break. Therefore, integral effect data for the DVI line break of ATLAS is very useful and available for an improvement and validation of safety codes. For the DVI line break in ATLAS, several analyses using MARS and RELAP codes were performed in the ATLAS DSP (Domestic Standard Problem) meetings. However, TRACE code has still not used to simulate a DVI line break. TRACE code has developed as the unified code for the reactor thermal hydraulic analyses in USNRC. In this study, the 100% DVI line break in ATLAS was evaluated by TRACE code. The objectives of this study are to identify the prediction capability of TRACE code for the major thermal hydraulic phenomena of a DVI line break in ATLAS

  14. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Science.gov (United States)

    2010-07-01

    ...) Cranes and hoists. This paragraph applies to the installation of electric equipment and wiring used in..., and similar events. This paragraph covers the installation of portable wiring and equipment, including... 29 Labor 5 2010-07-01 2010-07-01 false Specific purpose equipment and installations. 1910.306...

  15. Using game engines in mixed reality installations

    NARCIS (Netherlands)

    Nakevska, M.; Vos, E.C.; Juarez, Alex; Hu, J.; Langereis, G.R.; Rauterberg, G.W.M.; Anacleto, J.; Fels, S.; Graham, N.; et al., xx

    2011-01-01

    In a mixed reality installation, a variety of technologies is integrated such as virtual reality, augmented reality, and animated virtual agents and robotic agents. One of the main challenges is how to design and implement a mixed reality installation that integrates a heterogeneous array of sensors

  16. Development of BPM/BLM DAQ System for KOMAC Beam Line

    Energy Technology Data Exchange (ETDEWEB)

    Song, Young-Gi; Kim, Jae-Ha; Yun, Sang-Pil; Kim, Han-Sung; Kwon, Hyeok-Jung; Cho, Yong-Sub [Korea Atomic Energy Research Institute, Gyeongju (Korea, Republic of)

    2016-10-15

    The proton beam is accelerated from 3 MeV to 100 MeV through 11 DTL tanks. The KOMAC installed 10 beam lines, 5 for 20-MeV beams and 5 for 100-MeV beams. The proton beam is transmitted to two target room. The KOMAC has been operating two beam lines, one for 20 MeV and one for 100 MeV. New beam line, RI beam line is under commissioning. A Data Acquisition (DAQ) system is essential to monitor beam signals in an analog front-end circuitry from BPM and BLM at beam lines. A data acquisition (DAQ) system is essential to monitor beam signals in an analog front-end circuitry from BPM and BLM at beam lines. The DAQ digitizes beam signal and the sampling is synchronized with a reference signal which is an external trigger for beam operation. The digitized data is accessible by the Experimental Physics and Industrial Control System (EPICS)-based control system, which manages the whole accelerator control. The beam monitoring system integrates BLM and BPM signals into the control system and offers realtime data to operators. The IOC, which is implemented with Linux and a PCI driver, supports data acquisition as a very flexible solution.

  17. On-line acquisition of plant related and environmental parameters (plant monitoring) in gerbera: determining plant responses

    NARCIS (Netherlands)

    Baas, R.; Slootweg, G.

    2004-01-01

    For on-line plant monitoring equipment to be functional in commercial glasshouse horticulture, relations between sensor readings and plant responses on both the short (days) and long term (weeks) are required. For this reason, systems were installed to monitor rockwool grown gerbera plants on a

  18. LS1 Report: The cryogenic line goes through the scanner

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    In spite of the complexity of LS1, with many different activities taking place in parallel and sometimes overlapping, the dashboard shows that work is progressing on schedule. This week, teams have started X-raying the cryogenic line to examine its condition in minute detail.   The LS1 schedule is pretty unfathomable for those who don't work in the tunnels or installations, but if you look down all the columns and stop at the line indicating today’s date, you can see that all of the priority and critical items are bang on time, like a Swiss watch. More specifically: the SMACC project in the LHC is on schedule, with a new testing phase for the interconnections which have already been consolidated; preparations are under way for the cable replacement campaign at Point 1 of the SPS (about 20% of the cables will not be replaced as they are completely unused); and the demineralised water distribution line is back in service, as are the electrical substations for the 400 and 66 kV line...

  19. An integrated in-line fluid characterization system for industrial applications(In-situ fluid mechanics experiments)

    OpenAIRE

    Johan, Wiklund; Reinhardt, Kotze; Beat, Birkhofer; Stefano, Ricci; Valentino, Meacci; Mats, Stading; Rainer, Haldenwang; SP-Technical Research Institute of Sweden; FPRC, Cape Peninsula University of Technology; Sika Services AG; Information Engineering Department - University of Florence; Information Engineering Department - University of Florence; SP-Technical Research Institute of Sweden; FPRC, Cape Peninsula University of Technology

    2015-01-01

    In this work we have presented the world's first commercially available embedded in-line fluids characterization system, "Flow-Viz". It has been specifically designed for the non-invasive, in-line, continuous, real-time velocity profile and rheological assessment of opaque, non-Newtonian industrial fluids. The Flow-Viz system has been successfully installed in pilot plants of international companies and used also for academic research. The technology has been applied to a wide range of fluids...

  20. Design, fabrication and installation of irradiation facilities

    International Nuclear Information System (INIS)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C.

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs

  1. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C. [and others

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs.

  2. Use and regulatory control of dental X-ray installations

    International Nuclear Information System (INIS)

    1999-01-01

    In the guide the safety requirements concerning dental X-ray installations and their use, prerequisities for exemption from a safety licence, and regulatory control are presented. The guide applies to conventional dental X-ray installations, by which an image is created on an X-ray film or other image receptor placed inside the mouth, and panorama tomography installations for dentition and the cephalostats associated with these. The guide does not apply to multitechnique tomography installations intended for the special imaging of the skull or jaws

  3. The beam diagnostic instruments in Beijing radioactive ion-beam facilities isotope separator on-line

    International Nuclear Information System (INIS)

    Ma, Y.; Cui, B.; Ma, R.; Tang, B.; Chen, L.; Huang, Q.; Jiang, W.

    2014-01-01

    The beam diagnostic instruments for Beijing Radioactive Ion-beam Facilities Isotope Separator On-Line are introduced [B. Q. Cui, Z. H. Peng, Y. J. Ma, R. G. Ma, B. Tang, T. Zhang, and W. S. Jiang, Nucl. Instrum. Methods 266, 4113 (2008); T. J. Zhang, X. L. Guan, and B. Q. Cui, in Proceedings of APAC 2004, Gyeongju, Korea, 2004, http://www.jacow.org , p. 267]. For low intensity ion beam [30–300 keV/1 pA–10 μA], the beam profile monitor, the emittance measurement unit, and the analyzing slit will be installed. For the primary proton beam [100 MeV/200 μA], the beam profile scanner will be installed. For identification of the nuclide, a beam identification unit will be installed. The details of prototype of the beam diagnostic units and some experiment results will be described in this article

  4. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  5. 49 CFR 192.193 - Valve installation in plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  6. The Management System for Nuclear Installations (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  7. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  8. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  9. Solar Panel Installations on Existing Structures

    OpenAIRE

    Tim D. Sass; Pe; Leed

    2013-01-01

    The rising price of fossil fuels, government incentives and growing public aware-ness for the need to implement sustainable energy supplies has resulted in a large in-crease in solar panel installations across the country. For many sites the most eco-nomical solar panel installation uses existing, southerly facing rooftops. Adding solar panels to an existing roof typically means increased loads that must be borne by the building-s structural elements. The structural desig...

  10. 30 CFR 56.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at... at least 6 feet high and at least 3 feet from any energized parts, casings, or wiring. ...

  11. Installation package for the Solaron solar subsystem

    Science.gov (United States)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  12. 46 CFR 176.702 - Installation tests and inspections.

    Science.gov (United States)

    2010-10-01

    ..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...

  13. Preparation, installation, and calibration of a 152-fiber imaging experiment at the Nevada Test Site

    International Nuclear Information System (INIS)

    Thayer, D.R.; Lyons, P.B.; Looney, L.D.; Manning, J.P.; Malone, R.M.

    1981-01-01

    Fiber-optic transmission lines are being used with increasing frequency in the demanding environment of nuclear device diagnostic tests at the Nevada Test Site. Previous reports have described diagnostic experiments that utilize properties of fiber-optic cables to provide capabilities that are extremely difficult to obtain with coaxial cable systems. This paper describes an imaging experiment conducted during the last quarter of 1980 at the Nevada Test Site involving 152 approx. 0.6-km long GI fibers in 18 cables. An imager cell sensitive to neutron and gamma radiation was located at approx. 8 m from the source. Individual elements of the fluor were coupled by approx. 10 m PCS fibers (for radiation damage resistance) to the GI fibers used for the uphole and surface lines to the detector station. Light from the imager cell in a 9-nm band, centered at 540 nm, was detected by photomultipliers and the electrical signals then recorded on oscilloscopes. Overall system bandwidth, including the fluor, was approx. 80 MHz. Due to the complexity of the experiment and the conditions associated with field testing, the PCS and GI fibers were cut and terminated under laboratory shop conditions prior to installation at the field site. Procedures used for quality assurance of the fiber assemblies as well as procedures used in checking fiber throughput during installation are described. The application of a large star coupler (5 input x 200 output fibers) used for system time and amplitude calibration and an attempt to shutter fibers with neutrons for a multiplexing application are also discussed

  14. Measurement of borders in power transmission lines; Medicao de fronteira em linhas de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Doria, Celso [Bandeirante Energia S.A., Sao Paulo, SP (Brazil)

    2001-07-01

    The creation of Bandeirantes Energia S/A, which is a energy distributor company and at the same time one of the four originated companies from the division of ELETROPAULO Eletricidade S/A, generated the need of consumed energy measurements. Different from a previous situation, which had been accomplished in the 230, 345 and 440 Kv transformer stations. With the aggravating of having been created two distribution companies by this division, which later possessed transmission lines in common finishing a border scenery of 88/138 kv in connection with CTEEP, EPTE, Furnas in station terminals and ELETROPAULO Metropolitana in transmission lines. In order to measure the consumed energy it has been necessary to install meters in all energy entrance subsystems, but there were certain cases for which part of the energy had been absorbed by other distribution company, some times before the connection with Bandeirantes some times after this connection to have been done. For these cases, it has been necessary to install meters at de middle of the line, it means installed meters at the border between the two companies. In February of 1999, they were initiate the studies of viability for these measurements implantation in all of the interface points among Bandeirantes and the other concessionaires, based on the premise that from 01/01/2000 on all the consumed energy by the company should be measured. In the end of May of 1999, with the design final definitions the studies were finished, after that, it has been started the equipment purchases and the actions to hire companies to execute these activities. Finally, in the last week of August of 1999 the construction activities were initiated and the circuits were energized in December of that year.

  15. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  16. CFPL installs products pipeline with directional drilling

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland number-sign 70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line

  17. Performance evaluation of the analytical control line for nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Knobloch, V.; Talas, M.

    1976-01-01

    The analytical line was placed in a five-section semi-hot cell of a total length of 35 m, height of fields 1 m and depth of 75 cm, comprising a manual lift, a sample store, equipment for the opening of the probe vessels, a chemical desk and a desk for preparing the chemical samples for radiometric determination. A two member team worked 6.5 hrs a day making an average of 4.4 chemical determinations and preparing two radiometric determinations. On the basis of experiences gained in this work recommendations are given for the construction of similar installations. A diagram is given of the line and the key parts are shown in figures. (M.K.)

  18. The effect of topography on the choice of optimal step intermediate supports along the line of the cable metro

    Directory of Open Access Journals (Sweden)

    Lagerev A.V.

    2017-09-01

    Full Text Available In article was formulated and solved the problem of conditional nonlinear optimization of the distance between inter-mediate supports during the design of the cable metro lines in highly urbanized environment, taking into account not the horizontal surface of the terrain. The optimization problem involves a single-criterion objective function that expresses the cost of construction of the cable metro line (total cost of intermediate supports and their foundations, traction and carrying steel cables and technical equipment. The specified objective function subject to minimization by finding the optimal combination of the distance between intermediate supports and tension carrying ropes with accounting con-structive, modal, structural and planning constraints in the form of nonlinear inequalities. When constructing the objec-tive function were considered three possible forms sagging of carrying ropes, which can be implemented for various values of the efforts of their tension. Analysis was done of the influence of the angle of the longitudinal slope of the surface relief along the line of the cable metro on the value of the optimal distance between intermediate supports de-pending on the design and cost of intermediate supports and at the cost of 1 km line of the cable metro. Quantitative calculations showed that with the increase of the longitudinal slope of the surface construction cost also increases with nonlinear increasing rate. The dependence of the cost of 1 km of line underground cable metro from the parameters of the relief is of extreme character with a pronounced minimum at small angles of inclination of the terrain surface about 3...60 degrees. The position of the minimum is quite stable and only slightly changes when enough significant change in the cost of intermediate supports and installed on them technological equipment. The most effective conditions for the construction of the cable metro is the terrain with considerable

  19. Proper Installation of New Windows | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  20. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  1. Installing fonts in LaTeX a user's experience

    NARCIS (Netherlands)

    Hanssen, F.T.Y.

    2003-01-01

    This paper presents a user's experience with installing fonts for use in LaTeX. It will be shown that it is not hard to make a standard Type 1 font work, if you use modern font installation software for LaTeX. All the steps necessary to install the example fonts will be shown. The example fonts used

  2. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  3. Installation And Test Of Electron Beam Generation System To Produce Far-Infrared Radiation And X-Ray Pulses

    International Nuclear Information System (INIS)

    Wichaisirimongkol, Pathom; Jinamoon, Witoon; Khangrang, Nopadon; Kusoljariyakul, Keerati; Rhodes, Michael W.; Rimjaem, Sakhorn; Saisut, Jatuporn; Chitrlada, Thongbai; Vilaithong, Thiraphat; Wiedemann, Helmut

    2005-10-01

    SURIYA project at the Fast Neutron Research Facility, Chiang Mai University, aims to establish a facility to generate femtosecond electron beams. This electron beam can be used to generate high intensity far-infrared radiation and ultra-short X-ray pulses. The main components of the system are a 3 MeV RF electron gun with a thermionic cathode, an a-magnet as a bunch compressor, and post acceleration 15-20 MeV by a linear accelerator (linac). Between the main components, there are focusing quadrupole magnets and steering magnets to maintain the electron beam within a high vacuum tube. At the end of the beam transport line, a dipole magnet has been installed to function as a beam dump and an energy spectrometer. After the installation and testing of individual major components were completed, we have been investigating the generation of the electron beam, intense far- infrared radiation and ultra short X-ray pulses

  4. First detector installed inside the ALICE solenoid...

    CERN Multimedia

    2006-01-01

    ALICE's emblematic red magnet welcomed its first detector on 23 September, when the array of seven Cherenkov detectors, named HMPID, was successfully installed. ALICE team members standing in front of the completed HMPID detector.The red magnet, viewed from its front opening. The HMPID unit, seen from the back (top right corner of photo) is placed on a frame and lifted onto a platform during the installation. After the installation of the ACORDE scintillator array and the muon trigger and tracking chambers, the ALICE collaboration fitted the first detector inside the solenoid. The HMPID, for High Momentum Particle Identification, was installed at the 2 o'clock position in the central and most external region of the space frame, just below the solenoid yoke. It will be used to extend the hadron identification capability of the ALICE experiment up to 5 GeV/c, thus complementing the reach of the other particle identification systems (ITS, TPC and TOF). The HMPID is a Ring Imaging Cherenkov (RICH) detector in a...

  5. Piezometer installation and monitoring procedure: Revision 1

    International Nuclear Information System (INIS)

    1987-04-01

    The Deaf Smith County (Texas) site has been selected by the US Department of Energy as one of three candidate sites for characterization to determine its suitability as a geologic repository for high-level nuclear waste. The installation and monitoring of piezometers has been identified as one of the tasks required during the development of an underground Exploratory Shaft Facility to satisfy specific information needs through a program of in situ testing, instrumentation and monitoring. The scope of piezometer installation and monitoring encompasses the installation of fluid pressure measuring equipment and the subsequent collection, presentation and interpretation of piezometric data from strata surrounding the Exploratory Shaft Facility (ESF) prior to, during and following construction of the ESF, and as part of geohydrologic testing within the ESF. This procedure describes the required instrumentation, equipment, and sequence of activities for piezometer installation in the ESF. The procedure also includes details on the data recording and presentation requirements, personnel responsibilities, test management and quality assurance. 16 refs., 12 figs., 2 tabs

  6. Industrial installation surveillance acoustic device

    International Nuclear Information System (INIS)

    Marini, Jean; Audenard, Bernard.

    1981-01-01

    The purpose of this invention is the detection of possible impacts of bodies migrating inside the installation, using acoustic sensors of the waves emitted at the time of impact of the migrating bodies. This device makes it possible to take into account only those acoustic signals relating to the impacts of bodies migrating in the area under surveillance, to the exclusion of any other acoustic or electric perturbing phenomenon. The invention has a preferential use in the case of a linear shape installation in which a fluid flows at high rate, such as a section of the primary system of a pressurized water nuclear reactor [fr

  7. Building Up an On-Line Plant Information System for the Emergency Response Center of the Hungarian Nuclear Safety Directorate

    International Nuclear Information System (INIS)

    Vegh, Janos; Major, Csaba; Horvath, Csaba; Hozer, Zoltan; Adorjan, Ferenc; Lux, Ivan; Horvath, Kristof

    2002-01-01

    The main design features, services, and human-machine interface characteristics are described of the CERTA VITA on-line plant information system developed and installed by KFKI AEKI at the Nuclear Safety Directorate (NSD) of the Hungarian Atomic Energy Authority (HAEA) in cooperation with experts from the NSD. The Center for Emergency Response, Training, and Analysis (CERTA) located at the headquarters of NSD, Budapest, Hungary, was established in 1997. The center supports the NSD installation, radiological monitoring, and advisory team in case of nuclear emergencies, with appropriate hardware and software for communication, diagnosis, prognosis, and prediction. The vital information transfer and analysis (VITA) system represents an important part of the CERTA, as it provides for the continuous remote inspection of the four VVER-440/V213 units of the Hungarian Paks nuclear power plant (NPP). The on-line information system maintains a continuous data link with the NPP through a managed leased line that connects CERTA to a gateway computer located at the Paks NPP. The present scope of the system is a result of a 4-yr development project: In addition to the basic safety parameter display functions, the VITA system now includes an on-line break parameter estimation module, an extensive training package based on simulated transients, and on-line data transfer capabilities to feed accident diagnosis/analysis codes

  8. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Eoliennes en Suisse. Liste de controle pour investisseurs de grandes installations

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  9. Monitoring beam position in the TRISTAN AR-to-MR transport lines

    International Nuclear Information System (INIS)

    Ieiri, Takao; Arinaga, Mitsuhiro

    1994-01-01

    A beam-position monitor (BPM) has been installed in the transport lines between the Accumulation Ring (AR) and the Main Ring (MR) of TRISTAN. This monitor can detect the beam position and its charge every passage of the beam. Variations of the beam position have been observed during the routine operation. An investigation into the AR extraction components has been carried out in order to clarify a source of the variations. (author)

  10. On-line chemistry monitoring for the secondary side

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Babcock and Wilcox (B and W) has developed a computerized water chemistry data acquisition and management system for nuclear plant secondary coolant systems. The Integrated Water Chemistry Monitoring System (IWCMS) provides on-line monitoring of conditions and rapid trend analysis of sampled data. So far it has been installed at GPU Three Mile Island unit 1 and at Toledo Edison Davis-Besse. The IWCMS meets the following utility needs for monitoring power plant chemistry: control of chemistry conditions to minimize corrosion and extend component/system life; continuous analysis of data from on-line detectors and grab samples; expediting of transient recovery actions with trend, alarm and evaluation capability; provision for rapid sharing of useful operational chemistry information; concentration of attention on evaluation instead of data manipulation. The system is composed of three functional parts: data acquisition hardware; PC-based computer system and customised system software. (author)

  11. You're a What? Solar Photovoltaic Installer

    Science.gov (United States)

    Torpey, Elka Maria

    2009-01-01

    This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…

  12. Robust on-line monitoring of biogas processes; Robusta maettekniker on-line foer optimerad biogasproduktion

    Energy Technology Data Exchange (ETDEWEB)

    Nordberg, Aake; Hansson, Mikael; Kanerot, Mija; Krozer, Anatol; Loefving, Bjoern; Sahlin, Eskil

    2010-03-15

    Although demand for biomethane in Sweden is higher than ever, many Swedish codigestion plants are presently operated below their designed capacity. Efforts must be taken to increase the loading rate and guarantee stable operation and high availability of the plants. There are currently no commercial systems for on-line monitoring, and due to the characteristics of the material, including corrosion and tearing, robust applications have to be developed. The objective of this project was to identify and study different monitoring technologies with potential for on-line monitoring of both substrate mixtures and anaerobic digester content. Based on the prerequisites and demands at Boraas Energi och Miljoe AB's (BEMAB, the municipal energy and waste utility in the city of Boraas, Sweden) biogas plant, the extent of the problems, measurement variables and possible ways of managing these issues have been identified and prioritized. The substrate mixtures in question have a high viscosity and are inhomogeneous with variation in composition, which calls for further homogenization, dilution and filtration to achieve high precision in the necessary analyses. Studies of using different mixers and mills showed that the particle size (800 mum) needed for on-line COD measurement could not be achieved. The problem of homogenization can be avoided if indirect measurement methods are used. Laboratory tests with NIR (near-infra red spectroscopy) showed that VS can be predicted (R2=0,78) in the interval of 2-9% VS. Furthermore, impedance can give a measurement of soluble components. However, impedance is not sensitive enough to give a good measurement of total TS. Microwave technology was installed at the production plant and showed a faster response to changes in TS than the existing TS-sensor. However, due to technical problems, the evaluation only could be done during a limited period of ten days. BEMAB will continue the measurements and evaluation of the instrument. The

  13. The EPICS-based remote control system for muon beam line devices at J-PARC MUSE

    Science.gov (United States)

    Ito, T. U.; Nakahara, K.; Kawase, M.; Fujimori, H.; Kobayashi, Y.; Higemoto, W.; Miyake, Y.

    2010-04-01

    The remote control system for muon beam line devices of J-PARC MUSE has been developed with the Experimental Physics and Industrial Control System (EPICS). The EPICS input/output controller was installed in standard Linux PCs for slow control of the devices. Power supplies for 21 magnetic elements and four slit controllers for the decay-surface muon beam line in the Materials and Life Science Experimental Facility are now accessible via Ethernet from a graphical user interface which has been composed using the Motif Editor and Display Manger.

  14. In-Containment Signal Acquisition and Data Transmission via Power Lines within High Dose Areas of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Mueller Steffen; Wibbing Sascha; Weigel Robert; Koelpin Alexander; Dennerlein, Juergen; Janke, Iryna; Weber, Johannes

    2015-01-01

    Signal acquisition and data transmission for innovative sensor systems and networks inside the containment of nuclear power plants (NPPs) is still a challenge with respect to safety, performance, reliability, availability, and costs. This especially applies to equipment upgrades for existing plants, special measurements, but also for new builds. This paper presents a novel method for efficient and cost-effective sensor signal acquisition and data transmission via power lines, in order to cope with the disadvantages of common system architectures that often suffer from poor signal integrity due to raw data transmissions via long cables, huge efforts and costs for installation, and low flexibility with respect to maintenance and upgrades. A transmitter-receiver architecture is proposed that allows multiplexing of multiple sensor inputs for unidirectional point-to-point transmission by superimposing information signals on existing AC or DC supply lines, but also on active and inactive sensor wires, or spare cables, using power line communication (PLC) technology. Based on commercial off-the-shelf (COTS) electronic parts, a radiation hard transmitter hardware is designed to operate in harsh environment within the containment during full plant operation. The system's modular approach allows application specific trade-offs between redundancy and throughput regarding data transmission, as well as various sensor input front-ends which are compatible with state of the art systems. PLC technology eliminates the need for costly installation of additional cables and wall penetrations, while providing a complementary and diverse communication technology for upgrades of existing systems. At the receiver side in low dose areas, signals are extracted from the power line, demodulated, and de-multiplexed, in order to regain the original sensor signal information and provide it either in analog or digital output format. Successful laboratory qualification tests, field trails

  15. In-Containment Signal Acquisition and Data Transmission via Power Lines within High Dose Areas of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Mueller Steffen; Wibbing Sascha; Weigel Robert; Koelpin Alexander [Institute for Electronics Engineering, University of Erlangen-Nuremberg (Germany); Dennerlein, Juergen; Janke, Iryna; Weber, Johannes [AREVA GmbH, Paul-Gossen-Str. 100, 91052 Erlangen (Germany)

    2015-07-01

    Signal acquisition and data transmission for innovative sensor systems and networks inside the containment of nuclear power plants (NPPs) is still a challenge with respect to safety, performance, reliability, availability, and costs. This especially applies to equipment upgrades for existing plants, special measurements, but also for new builds. This paper presents a novel method for efficient and cost-effective sensor signal acquisition and data transmission via power lines, in order to cope with the disadvantages of common system architectures that often suffer from poor signal integrity due to raw data transmissions via long cables, huge efforts and costs for installation, and low flexibility with respect to maintenance and upgrades. A transmitter-receiver architecture is proposed that allows multiplexing of multiple sensor inputs for unidirectional point-to-point transmission by superimposing information signals on existing AC or DC supply lines, but also on active and inactive sensor wires, or spare cables, using power line communication (PLC) technology. Based on commercial off-the-shelf (COTS) electronic parts, a radiation hard transmitter hardware is designed to operate in harsh environment within the containment during full plant operation. The system's modular approach allows application specific trade-offs between redundancy and throughput regarding data transmission, as well as various sensor input front-ends which are compatible with state of the art systems. PLC technology eliminates the need for costly installation of additional cables and wall penetrations, while providing a complementary and diverse communication technology for upgrades of existing systems. At the receiver side in low dose areas, signals are extracted from the power line, demodulated, and de-multiplexed, in order to regain the original sensor signal information and provide it either in analog or digital output format. Successful laboratory qualification tests, field trails

  16. A new beam emission polarimetry diagnostic for measuring the magnetic field line angle at the plasma edge of ASDEX Upgrade.

    Science.gov (United States)

    Viezzer, E; Dux, R; Dunne, M G

    2016-11-01

    A new edge beam emission polarimetry diagnostic dedicated to the measurement of the magnetic field line angle has been installed on the ASDEX Upgrade tokamak. The new diagnostic relies on the motional Stark effect and is based on the simultaneous measurement of the polarization direction of the linearly polarized π (parallel to the electric field) and σ (perpendicular to the electric field) lines of the Balmer line D α . The technical properties of the system are described. The calibration procedures are discussed and first measurements are presented.

  17. Installation Test of Cold Neutron Soruce In-pool Assembly

    International Nuclear Information System (INIS)

    Lee, Kye Hong; Choi, J.; Wu, S. I.; Kim, Y. K.; Cho, Y. G.; Lee, C. H.; Kim, K. R.

    2006-04-01

    Before installation of the final cold neutron source in-pool assembly (IPA) in the vertical CN hole at the HANARO, the research reactor, the installation test of IPA has been conducted in the CN hole of the reactor using a full-scaled mock-up in-pool assembly. The well-known cold neutron sources, being safely operated or being now constructed, had been constructed together with each research reactor; therefore, there was little limitation to obtain the optimal cold neutron source since a cold neutron source had been decided to be installed in the reactor from the beginning of the design for the reactor construction. Unlikely, the HANARO has been operated for 10 years so that we have got lots of design limitation in terms of the decisions in the optimal shape, size, minimal light-water gap, and adhesion degree to the CN beam tube, IPA installation tools, etc. for the construction of the CNS. Accordingly, the main objective of this test is to understand any potential problem or interference happened inside the reactor by installing the mock-up IPA and installation bracket. The outcomes from this test is reflected on the finalizing process of the IPA detail design

  18. An after-market, five-port vertical beam line extension for the PETtrace

    Science.gov (United States)

    Barnhart, T. E.; Engle, J. W.; Severin, G. W.; Valdovinos, H. F.; Gagnon, K.; Nickles, R. J.

    2012-12-01

    Most commercial cyclotrons intended for medical isotope production provide a limited number of beam ports crowded into a minimal vault space. Taking advantage of our new lab construction, we planned and installed a beam-line on port ♯2 of our GEMS PETtrace to bring beam to an additional 5 target positions. These are oriented in the vertical plane, with the downward directed beam well suited for molten target substrates.

  19. Rules and regulations on ionizing radiations sources installations

    International Nuclear Information System (INIS)

    1980-01-01

    The finality of this legislative text is to establish the standards and procedures for site, design, building, operation and decommissioning of nuclear installations, radioactive installations and ionizing radiations sources. This text include the commercialization of radioactive substances and equipment fabrication

  20. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  1. Design and installation of a Prototype Geohazard Monitoring System near Machu Picchu, Peru

    Directory of Open Access Journals (Sweden)

    M. H. Bulmer

    2010-09-01

    Full Text Available The town of Machu Picchu, Peru, serves the >700 000 tourists visiting Machu Picchu annually. It has grown threefold in population in the past two decades. Due to the limited low-lying ground, construction is occurring on the unstable valley slopes. Slopes range from <10° on the valley floor to >70° in the surrounding mountains. The town has grown on a delta formed at the confluence of the Alcamayo, Aguas Calientes and Vilcanota Rivers. Geohazards in and around the town of particular concern are 1 large rocks falling onto the town and/or the rail line, 2 flash flooding by any one of its three rivers, and 3 mudflows and landslides. A prototype early warning system that could monitor weather, river flow and slope stability was installed along the Aguas Calientes River in 2009. This has a distributed modular construction allowing components to be installed, maintained, salvaged, and repaired by local technicians. A diverse set of candidate power, communication and sensor technologies was evaluated. Most of the technologies had never been deployed in similar terrain, altitude or weather. The successful deployment of the prototype proved that it is technically feasible to develop early warning capacity in the town.

  2. Classified installations for environmental protection subject to declaration. Tome 2

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Legislation concerning classified installations govern most of industries or dangerous or pollutant activities. This legislation aims to prevent risks and harmful effects coming from an installation, air pollution, water pollution, noise, wastes produced by installations, even aesthetic bad effects. Pollutant or dangerous activities are defined in a list called nomenclature which obliged installations to a rule of declaration or authorization. Technical regulations ordered by the secretary of state for the environment are listed in tome 2

  3. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  4. 46 CFR 11.470 - Officer endorsements as offshore installation manager.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Officer endorsements as offshore installation manager... Officer endorsements as offshore installation manager. (a) Officer endorsements as offshore installation manager (OIM) include: (1) OIM Unrestricted; (2) OIM Surface Units on Location; (3) OIM Surface Units...

  5. Offshore Wind Energy Cost Modeling Installation and Decommissioning

    CERN Document Server

    Kaiser, Mark J

    2012-01-01

    Offshore wind energy is one of the most promising and fastest growing alternative energy sources in the world. Offshore Wind Energy Cost Modeling provides a methodological framework to assess installation and decommissioning costs, and using examples from the European experience, provides a broad review of existing processes and systems used in the offshore wind industry. Offshore Wind Energy Cost Modeling provides a step-by-step guide to modeling costs over four sections. These sections cover: ·Background and introductory material, ·Installation processes and vessel requirements, ·Installation cost estimation, and ·Decommissioning methods and cost estimation.  This self-contained and detailed treatment of the key principles in offshore wind development is supported throughout by visual aids and data tables. Offshore Wind Energy Cost Modeling is a key resource for anyone interested in the offshore wind industry, particularly those interested in the technical and economic aspects of installation and decom...

  6. On-line fouling monitor for heat exchangers

    International Nuclear Information System (INIS)

    Tsou, J.L.

    1995-01-01

    Biological and/or chemical fouling in utility service water system heat exchangers adversely affects operation and maintenance costs, and reduced heat transfer capability can force a power deaerating or even a plant shut down. In addition, service water heat exchanger performance is a safety issue for nuclear power plants, and the issue was highlighted by NRC in Generic Letter 89-13. Heat transfer losses due to fouling are difficult to measure and, usually, quantitative assessment of the impact of fouling is impossible. Plant operators typically measure inlet and outlet water temperatures and flow rates and then perform complex calculations for heat exchanger fouling resistance or ''cleanliness''. These direct estimates are often imprecise due to inadequate instrumentation. Electric Power Research Institute developed and patented an on-line condenser fouling monitor. This monitor may be installed in any location within the condenser; does not interfere with routine plant operations, including on-line mechanical and chemical treatment methods; and provides continuous, real-time readings of the heat transfer efficiency of the instrumented tube. This instrument can be modified to perform on-line monitoring of service water heat exchangers. This paper discusses the design, construction of the new monitor, and algorithm used to calculate service water heat exchanger fouling

  7. Installed capacity in New York

    International Nuclear Information System (INIS)

    Charlton, J.

    2006-01-01

    This presentation discussed capacity issues related to the New York Independent System Operator (NYISO). The NYISO's market volume was approximately $11 billion in 2005, and it was responsible for providing 32,075 MW of electricity at peak load to its users. Regulatory uncertainty is currently discouraging investment in new generating resources. All load serving entities are required to contract for sufficient capacity in order to meet their capacity obligations. Market participants currently determine capacity and energy revenues. The NYISO market allows suppliers to recover variable costs for providing ancillary services, and the economic value of the revenue source governs decisions made in the wholesale electricity market. The installed capacity market was designed as a spot auction deficiency auction. Phased-in demand curves are used to modify the installed capacity market's design. A sloped demand curve mechanism is used to value capacity above the minimum requirement for both reliability and competition. Participation in the day-ahead market enhances competition and exerts downward pressure on energy and ancillary service market prices. It was concluded that the market structures and design features of the installed capacity markets recognize the need for system reliability in addition to encouraging robust competition and recognizing energy price caps and regulatory oversights. tabs., figs

  8. Awareness of the Installation the Lightning Protection System (LPS by Using Structural Bonding Method in Malaysia

    Directory of Open Access Journals (Sweden)

    Abdul Rahim Mustaqqim

    2017-01-01

    Full Text Available Structural Bonding Method (SBM is one type of Lightning Protection System (LPS, design to protect human, structures, contents inside structures, electrical equipment, transmission lines and other from the lightning flash. Besides, SBM is a standard LPS that comply with technical standards or codes of practice or called as conventional Lightning Protection System. In order to know the level of the Awareness of the Installation LPS by using SBM in the building among Civil Engineering Consultants, conducting survey need to be done. This paper presents the Research Design and Research Strategy in conducting the survey. It is explaining about the way before conducting the survey which are determine the population of sample (Consultant Company at Northern Region Area, samples of respondents (Civil Engineer at Consultant Office with the number of sample is 40, data collecting process, structure of the questionnaire form and the way in analysis the data. After the analysis the data, the result of the level of awareness in the Installation of LPS by using SBM are consider as moderate level.

  9. Installation and operation of a chain of detection of tritium for groundwater dating at Madagascar-INSTN

    International Nuclear Information System (INIS)

    ANDRIAMIHARITSOA, G.

    2008-01-01

    The present study aims at installing and operating the Madagascar -INSTN tritium line for groundwater dating. The laboratory was first installed in July 2007 and is operational since January 2008. The objective of the laboratory is to determine the tritium activity in water sample by electrolytic enrichment prior to Liquid Scintillation Counting. The spike analyses showed that the mean value of the enrichment factor is 23.78 and that of the enrichment parameter is 0.88 for the first analysis. Such factor value is much higher than the usual determined value of 18 for a first enrichment run and shows that the electrolytic cells are working properly. the standard deviations are 1.6 and 0.02 for the enrichment factor and parameter, respectively. This indicates that the cells performance is approximately the same. The dead water activity is very low, with a value of 1.07cpm, while the inside and outside contamination control water activities are 0.5 cpm and 0.4 cpm, respectively. These values indicate that the laboratory is free of any contamination. [fr

  10. Installation of foundation fieldbus to KUR

    International Nuclear Information System (INIS)

    Ishihara, Shinji; Fujita, Yoshiaki

    1999-11-01

    The instrumentation and control system for the research reactor in Research Reactor Institute, Kyoto University has been used for the safe and steady operation since the initial critical attainment in 1964. It has been modified and added many devices in the chance of increasing the reactor power from 1 MW to 5 MW, installing new experimental facilities or fitting to modified nuclear regulations. In order to avoid the unscheduled shutdown of the research reactor by cause the failure of the devices, most of instrumentation system was renewed in 1999. Operating the research reactor more safely and reliably, Supervisory Control Automation and Data Acquisition System which employed personal computers with the Windows NT operating system was added to the conventional instrumentation system, and the fieldbus system called Foundation Fieldbus was installed. Compared with conventional instrumentation system, each fieldbus system has some advantages. Many kinds of fieldbus systems have been developed and sold on the markets in some countries. Foundation Fieldbus standardizing international, which was able to use the devices made by multi-vendor was tentatively installed to study particular techniques about Foundation Fieldbus. The primary coolant flow rate, the temperature difference between the reactor tank inlet and outlet temperatures, the calorimetric power and the reactor power in nuclear instrumentation are monitored on human-machine interface devices on the fieldbus. The programmable logic controller is employed to control the information system for the reactor. This paper introduces Foundation Fieldbus installed. (author)

  11. Decommissioning and abandonment of offshore installations

    International Nuclear Information System (INIS)

    Side, J.C.

    1992-01-01

    To the onlooker surprising little thought was given at the project planning stage to the fate of offshore facilities once their production lifetimes had come to an end. Throughout the 1970s at least, international law required the complete removal of all structures and installations one disused or abandoned. Fishermen's organisations were led to believe that such installations would be entirely removed yet many of the designs of these show that removal was not much in the minds of the engineers or project management during the design stages. Changes in the text of the United Nations' Convention on the Law of the Sea and (by their widespread legal adoption) in customary international law may now permit partial removal of installations subject to important safeguards for navigation, the environment and other users of the sea. Of the North Sea states at least one has adopted policies that will minimise the cost associated with offshore decommissioning and abandonment and both the UK and Norway are adopting legislation which will provide for a case by case approach to the decommissioning and abandonment of offshore facilities and allow partial removal options. There has thus been a recent and significant change in approach to the abandonment of offshore oil and gas installations. This chapter reviews the development of abandonment laws and policies, outlines the available removal options, and provides a consideration of the environmental and fishery implications of these for the North Sea. (Author)

  12. Evaluation of Carcass Quality for Coliforms, Salmonella and Psychrophiles on Evisceration and Chiller lines in Yazd Province Industrial Poultry Slaughterhouses

    Directory of Open Access Journals (Sweden)

    M Mofidi

    2014-05-01

    In general, it can be said that secondary contamination in the slaughter line along with gradual increase in temperature of the chiller can increase bacterial load of both coliforms and salmonella but it will not affect the amount of psychrophile bacteria. Due to some differences between the studied slaughterhouses, microbial load of coliform and salmonella can be acheived by improving the management and installation of appropriate aquipments in the evisceration line.

  13. Y2K bug and nuclear installations; Le passage a l'an 2000 sur les installations nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    1999-10-01

    Most nuclear installations except power plants, will be shut down on the eve of new year. By september 1999, EDF will have realized all the corrective and preventive actions that are necessary to pass Y2K. CEA has committed to present to safety authorities a complete report concerning preventive actions in its own basic nuclear installations. Safety authorities plan to organize a crisis center in order to face any problem. (A.C.)

  14. 30 CFR 77.509 - Transformers; installation and guarding.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a... feet from any energized parts, casings, or wiring. (b) Transformer stations shall be enclosed to...

  15. 47 CFR 80.903 - Inspection of radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... ship passes the inspection, the technician will issue a Communications Act Safety Radiotelephony... 47 Telecommunication 5 2010-10-01 2010-10-01 false Inspection of radiotelephone installation. 80... Passenger Boats § 80.903 Inspection of radiotelephone installation. Every vessel subject to Part III of...

  16. Operational experience with synchrotron light interferometers for CEBAF experimental beam lines

    Energy Technology Data Exchange (ETDEWEB)

    Pavel Chevtsov

    2006-10-24

    Beam size and energy spread monitoring systems based on Synchrotron Light Interferometers (SLI) have been in operations at Jefferson Lab for several years. A non-invasive nature and a very high (a few mm) resolution of SLI make these instruments valuable beam diagnostic tools for the CEBAF accelerator. This presentation describes the evolution of the Synchrotron Light Interferometer at Jefferson Lab and highlights our extensive experience in the installation and operation of the SLI for CEBAF experimental beam lines.

  17. Construction of a differential thermal analysis installation; Realisation d'une installation d'analyse thermique differentielle

    Energy Technology Data Exchange (ETDEWEB)

    Branche, G; Chantret, F [Commissariat a l' Energie Atomique, Saclay (France).Centre d' Etudes Nucleaires

    1959-07-01

    The authors are indicating the characteristics of a D.T.A. installation they built. Experimental rooms, ovens, thermal regulation, recording methods are thoroughly described, with outlining of the requirements to obtain a high sensitivity. Numerous D.T.A. curves relating to argillaceous substances, bituminous shales, and uraniferous compounds are given. (author) [French] Les auteurs donnent les caracteristiques de l'installation d'Analyse Thermique Differentielle qu'ils ont construits. Ils decrivent en detail les chambres d'experiences, les fours, la regulation thermique, l'enregistrement, en insistant sur les conditions necessaires pour obtenir une sensibilite elevee. Ils donnent de nombreuses courbes differentielles relatives des produits argileux, des schistes bitumineux et des composes uraniferes. (auteur)

  18. Antimicrobial efficacy and longevity of silver+zeolite incorporating preinsulated ducts installed in real healthcare settings.

    Science.gov (United States)

    Tinteri, C; Potenza, M; Rizzetto, R

    2012-12-01

    The values of microbial growth in the air exiting from the heating, ventilation and air conditioning (HVAC) ducts treated with silver/zeolite have been shown to be lower than those in the air coming out the traditional metal ones. This study aims to verify how long this antimicrobial activity lasts. All the tests were performed according to US ASTM E2180-01 and ISO-JIZ 22196 standards. Samples of aluminum cladding panels of different thickness and incorporating silver-zeolite were tested in order to verify their thickness depending antibacterial activity. The same kind of linings samples were analyzed after a simulated and accelerated ageing process. Ag-zeolite incorporating HVAC duct panels linings were tested after years from their installation, in order to verify the maintenance of their bactericidal power during time. For laminates containing different amounts of silver+Zeolite it was shown that also in panels with minimum thickness tested, the lowest germicidal effect (GE) found was still very good (GE of 5,76 ULog10). After their wearing and tearing the antimicrobial activity tended to increase passing from 7.2081 to 8.29922 LogUnits in panels 80 microns thick. For still hospital working aluminium foils incorporating Silver/Zeolite on panels installed through 2006 and 2008, the antimicrobial action of zeolite was still firmly present even after two years and three years.The germicidal effect standards were maintained even during time on constant values between 7.477 and 7.086 LogUnits. The persistence of bactericidal efficacy of Ag+zeolite treatment in all the materials used for the construction of HVAC ductworks can be confirmed.

  19. 30 CFR 57.4131 - Surface fan installations and mine openings.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface fan installations and mine openings. 57... Fire Prevention and Control Prohibitions/precautions/housekeeping § 57.4131 Surface fan installations... stored within 100 feet of mine openings or within 100 feet of fan installations used for underground...

  20. Project W-314 specific test and evaluation plan for SN-635 transfer line (241-AY-01A to 241-AY-02A) and SN-633 transfer line tie in

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the installation of the SN-635 transfer line for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-635 transfer line and the tie in of SN-633 to the AY-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  1. RADAR 2020. Outline of important future developments for installation businesses

    International Nuclear Information System (INIS)

    Pleijster, F.; Braaksma, R.; Van Hoorik, P.; Pikaart, A.; Zwinkels, A.; Muizer, A.

    2010-11-01

    This RADAR focuses on future trends in the broad field of the installation industry with the aim of developing supporting policy for the installation businesses based on the objectives of UNETO-NVO and OTIB. Trends that can be earmarked as relevant for the installation industry are: Social development, Economic development, Technological development, Organizational development, Economic development, and Political development. In this framework, attention is mainly paid to the developments in the following working areas of the installation industry: Climate Engineering, Electrical Engineering, Sanitary engineering, and ICT. [nl

  2. Installation Strategy for the LHC Main Dipoles

    CERN Multimedia

    Fartoukh, Stephane David

    2004-01-01

    All positions in the LHC machine are not equivalent in terms of beam requirements on the geometry and the field quality of the main dipoles. In the presence of slightly or strongly out-of tolerance magnets, a well-defined installation strategy will therefore contribute to preserve or even optimize the performance of the machine. Based on the present status of the production, we have anticipated a list of potential issues (geometry, transfer function, field direction and random b3) which, combined by order of priority, have been taken into account to define a simple but efficient installation algorithm for the LHC main dipoles. Its output is a prescription for installing the available dipoles in sequence while reducing to an absolute minimum the number of holes required by geometry or FQ issues.

  3. Transmission line undergrounding : rate impact investigation and analysis

    International Nuclear Information System (INIS)

    2004-01-01

    In response to concerns expressed by the residents of Markham, Ontario regarding the possible environmental and health impacts of a proposed 230 kV overhead transmission line, Hydro One Networks Inc. (HONI) has proposed to place the line underground as an alternative. This analysis was prepared to evaluate the potential impacts on transmission rates and consumer prices related to changes in the level of underground construction of transmission lines by HONI, as opposed to overhead construction. The report presents the approach to data collection; cost estimates and projections; the modeling and projecting of HONI's regulated rate base and revenue requirement on a basis that reflects the manner in which its future transmission rates are expected to be established; estimates of the incremental cost of undergrounding reflecting a range of reasonable assumptions; and a comparison of the resulting transmission costs and total customer bill. To address the issue of potential demand in other municipalities for additional undergrounding, the study also examined the cumulative effects of ten years' incremental undergrounding costs (i.e. effects on 2014 rates). It was concluded that if HONI were to implement an undergrounding program beginning in 2005, resulting in the installation of 80 km of underground lines by 2014, and shared costs by all users of HONI's system through the network transmission charges, the 2014 transmission rates would be higher. 5 tabs

  4. The 12th 735-kV transmission line project: Hydro-Quebec network

    International Nuclear Information System (INIS)

    1992-01-01

    Hydro-Quebec is proposing to construct a 735-kV transmission line from the Chissibi station near the LG3 hydroelectric power plant to the Jacques-Cartier station near Quebec City. The width of the right-of-way will generally be 90 m and it is intended to install the line in two stages. The Chissibi-Chibougamau section should enter service in 1993 and the Chibougamau-Cartier section in 1994. The cost of the line is estimated at $1.21 billion, of which $900 million is for line construction and $310 million for station equipment. Prospective corridors for the line route have been selected, portions of which enable twinning with Hydro-Quebec's existing 9th 735-kV line. A series of hearings on the environmental and other impacts of the power line project was held by the Bureau d'audiences publiques sur l'environnement and results are summarized along with the views of the Bureau. The summary describes the justification for the project, the choice of the transmission line route, the evaluation of the impacts of the project on the natural and human environments, health effects due to magnetic fields, and effects on the economic development of northern Quebec. Recommendations are given for mitigating the impacts of the project. 13 refs., 8 figs., 2 tabs

  5. IPPC installations in France and limit values of emission

    International Nuclear Information System (INIS)

    Soleille, S.

    2004-05-01

    The IPPC directive of the 24 September 1996 asked for the main european industrial installations an authorization. This authorization fixes limit values for pollutant emissions. In France, the main industrial installations are controlled since many years in the framework of the regulation on classified installations for the environment protection (ICPE). This report compares the limit values of emissions for the national and prefectorial orders and for the IPPC directive. (A.L.B.)

  6. INMACS - An approach to on-line nuclear materials accounting and control in a fuel fabrication environment

    International Nuclear Information System (INIS)

    Yan, G.; L'Archeveque, J.V.R.; Paul, R.N.

    1977-08-01

    Taking advantage of modern system technologies, the concept of an Integrated Nuclear Materials Accounting and Control System (INMACS) was formulated as an alternative solution to manual inventory procedures. The selected approach offers prospects for tackling the more general fissile materials inventory problem while satisfying the immediate requirements of the Fuel Fabrication Pilot Line at CRNL. A PDP-11/40 minicomputer system was purchased, and a Data Base Management System (DBMS) was designed and implemented to provide a uniform file handling capability. The specific requirements of the Pilot Line were met by a package of application programs. About 16 man-years have been spent on the project. INMACS has been installed in the field and its usefulness as an on-line inventory system will be demonstrated in the Pilot Line. (author)

  7. Aggregate Production Planning, Casestudy in a Medium-sized Industry of the Rubber Production Line in Ecuador.

    Science.gov (United States)

    Rosero-Mantilla, César; Sánchez-Sailema, Mayra; Sánchez-Rosero, Carlos; Galleguillos-Pozo, Rosa

    2017-06-01

    This research aims to improve the productivity in the rubber line of a medium-sized industry by increasing the production capacities through the use of the Aggregate Production Planning model. For this purpose an analysis of the production processes of the line was made and the aggregate plan was defined evaluating two strategies: Exact Production Plan (Zero Inventory) and Constant Workforce Plan (Vary Inventory) by studying the costs of both inventory maintenance and workforce. It was also determined how the installed capacity was used with the standards of the rubber line and measures for decreasing production costs were proposed. It was proven that only 70% of the plant capacity was being used so it could be possible to produce more units and to obtain a bigger market for the products of this line.+

  8. Study for reactive power on distribution system line B RSG-GAS

    International Nuclear Information System (INIS)

    Yan Bony Marsahala

    2010-01-01

    Study for reactive power on distribution system line B RSG-GA is already done. The study intended to evaluate how much inductive load need the reactive power (positive), how much power factor, and what will be done to increase the power factor. The reactive power is the losses power, can't be changed into energy, but it is need for transmission process and it is cause the energy losses. The loads on distribution system line B consist of induction motors which are used for primary cooling system and secondary cooling system, lift, blower on cooling tower, and air condition system. Due to the motors using, the power factor are falling down to low. By the calculation results give that the inductive loads on distribution line B are 850 KVA and these loads caused the low power factor 0.80. If we want to increase the power factor up to 0.95, it is need to install the reactive loads likes capacitor bank 250 KVAR. (author)

  9. The dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Lacoste, A.C.; Duthe, M.; Mignon, H.; Lambert, F.; Pradel, Ph.; Hillewaere, J.P.; Dupre la Tour, St.; Mandil, C.; Weil, L.; Eickelpasch, N.; Finsterwalder, L.

    1997-01-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of 'Controle'to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  10. An after-market, five-port vertical beam line extension for the PETtrace

    Energy Technology Data Exchange (ETDEWEB)

    Barnhart, T. E.; Engle, J. W.; Severin, G. W.; Valdovinos, H. F.; Gagnon, K.; Nickles, R. J. [Department of Medical Physics, University of Wisconsin, Madison, WI (United States); Los Alamos National Lab, Los Alamos, NM (United States); Hevesy Laboratory, Danish Technical University, Riso (Denmark); Department of Medical Physics, University of Wisconsin, Madison, WI (United States); Department of Radiology, University of Washington, Seattle, WA (United States); Department of Medical Physics, University of Wisconsin, Madison, WI (United States)

    2012-12-19

    Most commercial cyclotrons intended for medical isotope production provide a limited number of beam ports crowded into a minimal vault space. Taking advantage of our new lab construction, we planned and installed a beam-line on port Music-Sharp-Sign 2 of our GEMS PETtrace to bring beam to an additional 5 target positions. These are oriented in the vertical plane, with the downward directed beam well suited for molten target substrates.

  11. DOD low energy model installation program

    International Nuclear Information System (INIS)

    Fournier, D.F. Jr.

    1993-01-01

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DoD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DoD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies. A military installation is in reality a small to medium sized city. It generally has a complete utilities infrastructure including water supply and distribution, sewage collection and treatment, electrical supply and distribution, central heating and cooling plants with thermal distribution, and a natural gas distribution system. These utilities are quite extensive and actually consume about 10-15% of the energy on the facility not counting the energy going into the central plants

  12. Some suggestions based on the instrumentation installation experience at RAPP

    International Nuclear Information System (INIS)

    Raghunath, M.R.; Singh, S.; Jain, V.K.

    1977-01-01

    Suggestions regarding installation of reactor instrumentation have been made based on the instrumentation installation experience at the Rajasthan Atomic Power Plant. It has been mentioned that the instrumentation installation work has to proceed simultaneously with that of the heavy equipment and piping errection work, to meet the commissioning target dates. (S.K.K.)

  13. A dynamic system for ATLAS software installation on OSG grid sites

    International Nuclear Information System (INIS)

    Zhao, X; Maeno, T; Wenaus, T; Leuhring, F; Youssef, S; Brunelle, J; De Salvo, A; Thompson, A S

    2010-01-01

    A dynamic and reliable system for installing the ATLAS software releases on Grid sites is crucial to guarantee the timely and smooth start of ATLAS production and reduce its failure rate. In this paper, we discuss the issues encountered in the previous software installation system, and introduce the new approach, which is built upon the new development in the areas of the ATLAS workload management system (PanDA), and software package management system (pacman). It is also designed to integrate with the EGEE ATLAS software installation framework. In the new system, ATLAS software releases are packaged as pacball, a uniquely identifiable and reproducible self-installing data file. The distribution of pacballs to remote sites is managed by ATLAS data management system (DQ2) and PanDA server. The installation on remote sites is automatically triggered by the PanDA pilot jobs. The installation job payload connects to a central ATLAS software installation portal, making the information of installation status easily accessible across OSG and EGEE Grids. The issues encountered in running the new system in production, and our future plan for improvement, will also be discussed.

  14. Advanced Measuring (Instrumentation Methods for Nuclear Installations: A Review

    Directory of Open Access Journals (Sweden)

    Wang Qiu-kuan

    2012-01-01

    Full Text Available The nuclear technology has been widely used in the world. The research of measurement in nuclear installations involves many aspects, such as nuclear reactors, nuclear fuel cycle, safety and security, nuclear accident, after action, analysis, and environmental applications. In last decades, many advanced measuring devices and techniques have been widely applied in nuclear installations. This paper mainly introduces the development of the measuring (instrumentation methods for nuclear installations and the applications of these instruments and methods.

  15. Optimal installation program for reprocessing plants

    International Nuclear Information System (INIS)

    Kubokawa, Toshihiko; Kiyose, Ryohei

    1976-01-01

    Optimization of the program of installation of reprocessing plants is mathematically formulated as problem of mixed integer programming, which is numerically solved by the branch-and-bound method. A new concept of quasi-penalty is used to obviate the difficulties associated with dual degeneracy. The finiteness of the useful life of the plant is also taken into consideration. It is shown that an analogous formulation is possible for the cases in which the demand forecasts and expected plant lives cannot be predicted with certainty. The scale of the problem is found to have kN binary variables, (k+2)N continuous variables, and (k+3)N constraint conditions, where k is the number of intervals used in the piece-wise linear approximation of a nonlinear objective function, and N the overall duration of the period covered by the installation program. Calculations are made for N=24 yr and k=3, with the assumption that the plant life is 15 yr, the plant scale factor 0.5, and the maximum plant capacity 900 (t/yr). The results are calculated and discussed for four different demand forecasts. The difference of net profit between optimal and non-optimal installation programs is found to be in the range of 50 -- 100 M$. The pay-off matrix is calculated, and the optimal choice of action when the demand cannot be forecast with certainty is determined by applying Bayes' theory. The optimal installation program under such conditions of uncertainty is obtained also with a stochastic mixed integer programming model. (auth.)

  16. The dismantling of CEA nuclear installations

    International Nuclear Information System (INIS)

    Piketty, Laurence

    2016-03-01

    After having indicated locations of French nuclear installations which are currently being dismantled (about 30 installations), and recalled the different categories of radioactive wastes with respect to their activity level and the associated storage options, this article gives an overview of various aspects of dismantling, more precisely in the case of installations owned and managed by the CEA. These operations comprise the dismantling itself, the recovery and packaging of wastes, old effluents and spent fuels. The organisation and responsible departments within the CEA are presented, and the author outlines some operational problematic issues met due to the age of installations (traceability of activities, regulation evolutions). The issue of financing is then discussed, and its uncertainties are outlined. The dismantling strategy within the CEA-DEN is described, with reference to legal and regulatory frameworks. The next parts of the article address the organisation and the economic impact of these decontamination and dismantling activities within the CEA-DEN, highlight how R and D and advanced technology are a support to this activities as R and D actions address all scientific and technical fields of nuclear decontamination and dismantling. An overview of three important dismantling works is proposed: Fontenay-aux-Roses, the Marcoule CEA centre (a reference centre in the field of nuclear dismantling and decontamination) and the Grenoble CEA centre (reconversion in R and D activities in the fields of technologies of information, of communication, technologies, for health, and in renewable energies). The last part addresses the participation to the Strategic Committee of the Nuclear Sector (CSFN)

  17. Design and installation package for a solar powered pump

    Science.gov (United States)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  18. Comparison of an Inductance In-Line Oil Debris Sensor and Magnetic Plug Oil Debris Sensor

    Science.gov (United States)

    Dempsey, Paula J.; Tuck, Roger; Showalter, Stephen

    2012-01-01

    The objective of this research was to compare the performance of an inductance in-line oil debris sensor and magnetic plug oil debris sensor when detecting transmission component health in the same system under the same operating conditions. Both sensors were installed in series in the NASA Glenn Spiral Bevel Gear Fatigue Rig during tests performed on 5 gear sets (pinion/gear) when different levels of damage occurred on the gear teeth. Results of this analysis found both the inductance in-line oil debris sensor and magnetic plug oil debris sensor have benefits and limitations when detecting gearbox component damage.

  19. Design and construction of UVSOR-BL4A2 beam line for nano-structure processing

    CERN Document Server

    Takezoe, N; Tanaka, T; Kurosawa, K; Nonogaki, Y; Noda, H; Mekaru, H; Urisu, T

    2001-01-01

    We have designed and constructed a new beam line BL4A2 at UVSOR mainly for nano-structure fabrication based on synchrotron radiation stimulated surface photochemical reactions. In order to obtain high-photon flux, we use white ray beam focused with only one mirror. The beam line is connected with ultra-high vacuum scanning tunneling microscope for in-situ atomic scale observations, low energy electron diffraction and Auger electron spectroscope for surface crystal structure characterization, and photo-stimulated surface reaction chamber. In order to monitor the optical properties with atomic scale, a near field optical microscope is planned to be installed.

  20. Design and construction of UVSOR-BL4A2 beam line for nano-structure processing

    International Nuclear Information System (INIS)

    Takezoe, N.; Yanagida, H.; Tanaka, T.; Kurosawa, K.; Nonogaki, Y.; Noda, H.; Mekaru, H.; Urisu, T.

    2001-01-01

    We have designed and constructed a new beam line BL4A2 at UVSOR mainly for nano-structure fabrication based on synchrotron radiation stimulated surface photochemical reactions. In order to obtain high-photon flux, we use white ray beam focused with only one mirror. The beam line is connected with ultra-high vacuum scanning tunneling microscope for in-situ atomic scale observations, low energy electron diffraction and Auger electron spectroscope for surface crystal structure characterization, and photo-stimulated surface reaction chamber. In order to monitor the optical properties with atomic scale, a near field optical microscope is planned to be installed

  1. 46 CFR 76.27-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  2. Listed installations for environmental protection in hospitals

    International Nuclear Information System (INIS)

    Mullot, J.U.; Chaulet, J.F.; Thual, A.; Lafon, M.

    1999-01-01

    This work deals with the implications of different French rules and regulations concerning the environmental protection in hospitals. A special place is given to listed installations for environmental protection, because of their importance. A summary of important regulatory texts is presented concerning these installations, and also an inventory of installations or activities concerned, and the definition of the necessary procedures. Some ideas are also given about the much needed creation of an 'environmental network' inside hospitals, in order to cope with these concerns. Then, we briefly deal with more recent developments concerning the environmental protection, which will, no doubt, extend to hospitals, such as the French water law, air law, and procedures for the management of medical waste. Finally, the stakes of environmental decisions in hospitals and the chemist's place in these decisions are debated. (authors)

  3. Leukaemia near british nuclear installations

    International Nuclear Information System (INIS)

    Hubert, D.

    1991-01-01

    An excess of childhood leukaemia has been seen near some British nuclear installations, especially near the Sellafield reprocessing plant. The same result was found in a more general study including a large number of nuclear sites. Similar studies made in USA, Canada and France have been negative. Moreover, epidemiological studies made in England have discovered other childhood leukaemia clusters in areas far from nuclear facilities, and especially near potential sites of nuclear installations. Several explanations are suggested but no definite conclusion is yet possible. Doses from radioactive releases seem to be too low to account for the additional deaths from leukaemia by environmental contamination. A virus activation, which might be associated with population influx into rural isolated areas, has been considered. The hypothesis of genetic mutation induced by ionising radiation in the fathers of children with leukaemia has been made because a higher risk of leukaemia was observed for children of fathers employed at Sellafield. No firm conclusion is possible considering the small number of observed cases and the lack of excess leukaemias in the offspring of Hiroshima and Nagasaki survivors. The possibility of internal contamination, chemicals or even radon is discussed as other causes. Studies in progress might allow to find an answer to the problem of leukaemia in the vicinity of British nuclear installations [fr

  4. Changing from booster transformer system to auto transformer system in the Kiruna-Raatsi-Svappavaara line in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Buelund, A.; Hellstroem, U. [Banverket, Swedisch National Rail Administration Engineering Dept., Borlaenge (Sweden); Varju, G. [Technical Univ. Budapest (Hungary). Dept. of Electrical Power System

    1999-07-01

    A study of the changeover from a booster transformer (BT) system to an auto transformer (AT) system has been initiated by Banverket to increase the transport capability (weight and speed) of a heavily loaded freight train lines of about 40 km situated between Raatsi and Svappavaara and fed from the Kiruna converter station. In this paper, firstly, a survey of comparison is given on the bases of sophisticated three-conductor line simulations for the two supply schemes in the point of view of equivalent impedance, losses, power rating for actual traffic conditions, longitudinal induction to line-side telecommunication cable, rail-to-earth and rail-to-rail potential. The results of simulation calculations have provided the necessary information on the rating of the AT scheme including the required number and locations of the auto transformers. At AT system has been installed in addition to the already existing BT without the removal of the BT system. This installation has allowed to change from one system to the other in one day period of time and thus giving the possibility of performing real scale comparison tests between the two schemes. The paper presents a survey of the results of two week time site measurements. (orig.)

  5. Nuclear Installations Act 1969

    International Nuclear Information System (INIS)

    1969-01-01

    The purpose of this Act is to amend the Nuclear Installations Act 1965 to bring it into full compliance with the international conventions on nuclear third party liability to which the United Kingdom is a Signatory, namely, the Paris Convention, the Brussels Supplementary Convention and the Vienna Convention. (NEA) [fr

  6. Installations having pressurised fluid circuits

    International Nuclear Information System (INIS)

    Rigg, S.; Grant, J.

    1977-01-01

    Reference is made to nuclear installations having pressurised coolant flow circuits. Breaches in such circuits may quickly result in much damage to the plant. Devices such as non-return valves, orifice plates, and automatically operated shut-off valves have been provided to prevent or reduce fluid flow through a breached pipe line, but such devices have several disadvantages; they may present large restrictions to normal flow of coolant, and may depend on the operation of ancillary equipment, with consequent delay in bringing them into operation in an emergency. Other expedients that have been adopted to prevent or reduce reverse flow through an upstream breach comprise various forms of hydraulic counter flow brakes. The arrangement described has at least one variable fluid brake comprising a fluidic device connected into a duct in the pressurised circuit, the device having an inlet, an outlet, a vortex chamber between the inlet and outlet, a control jet for introducing fluid into the vortex chamber, connections communicating the inlet and the outlet into one part of the circuit and the control jet into another region at a complementary pressure so that, in the event of a breach in the circuit in one region, fluid passes from the other region to enter the vortex chamber to stimulate pressure to create a flow restricting vortex in the chamber that reduces flow through the breach. The system finds particular application to stream generating pressure tube reactors, such as the steam generating heavy water reactor at UKAEA, Winfrith. (U.K.)

  7. Questions for the nuclear installations inspectorate

    International Nuclear Information System (INIS)

    Conroy, C.; Flood, M.; MacRory, R.; Patterson, W.C.

    1976-01-01

    The responsibilities of the Nuclear Installations Inspectorate are considered, and the responsibilities of other bodies for (a) reprocessing and enrichment, and (b) security. Questions for the Nuclear Installations Inspectorate are then set out under the following heads: general (on such topics as vandalism, sabotage, threats, security, reactor incidents); magnox reactors; corrosion; advanced gas-cooled reactor; steam generating heavy water reactor; fast breeder reactor; reproces-sing and waste. Most of the questions are concerned with technical problems that have been reported or might possibly arise during construction or operation, affecting the safety of the reactor or process. (U.K.)

  8. First DT+RPC chambers installation round in the UX5 cavern

    CERN Multimedia

    Jesus Puerta-Pelayo

    2007-01-01

    DT+RPC packages corresponding to sectors 1 and 7 of the barrel region cannot be installed on surface, since the lowering gantry from SX5 to UX5 uses their gaps to hold the wheels. Therefore this installation has to be carried out in the cavern. These pictures illustrate the first installation round on YB+2 right after the lowering. A total of 8 chambers were successfully installed in 2 days.

  9. Professional installation of overvoltage protection devices. The most common installation errors; Fachgerechte Installation von Ueberspannungsschutzgeraeten. Die haeufigsten Installationsfehler

    Energy Technology Data Exchange (ETDEWEB)

    Gmelch, L. [Dehn und Soehne GmbH und Co. KG, Neumarkt (Germany)

    2007-07-01

    Increasingly sensitive electronic equipment and high demands on plant and system availability necesstate effective protection against lightning and overvoltage. Apart from the measures that must be taken already in the projecting phase in order to minimize the risk of interferences, disturbances and destruction of plants and systems, there are also some basic principles that must be observed when installing overvoltage protection equipment. If these are neglected, the protective function of overvoltage protection systems may be seriously impaired. (orig.)

  10. 46 CFR 76.35-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.35-15 Section 76.35-15... EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  11. 46 CFR 76.25-35 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.25-35 Section 76.25-35... EQUIPMENT Automatic Sprinkling System, Details § 76.25-35 Operation and installation. (a) The system shall... all its components shall be used for no other purpose. (h) All wiring and electrical circuits and...

  12. 46 CFR 76.30-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.30-15 Section 76.30-15... EQUIPMENT Pneumatic Fire Detecting System, Details § 76.30-15 Operation and installation. (a) The system... that it may be incorporated with the manual alarm system. (e) All wiring and electrical circuits and...

  13. 46 CFR 182.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust pipe... equipment might come in contact with an exhaust pipe. (b) Exhaust gas must not leak from the piping or any...

  14. Installation of a second superconducting wiggler at SAGA-LS

    Energy Technology Data Exchange (ETDEWEB)

    Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.; Koda, S. [SAGA Light Source, 8-7 Yayoigaoka, Tosu 841-0005 (Japan)

    2016-07-27

    The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of the vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.

  15. Preliminary design for spent fuel canister handling systems in a canister transfer and installation vehicle

    International Nuclear Information System (INIS)

    Wendelin, T.; Suikki, M.

    2008-12-01

    The report presents a spent fuel canister transfer and installation vehicle. The vehicle is used for carrying the fuel canister into a disposal tunnel and installing it into a deposition hole. The report outlines basic requirements and a design for canister handling equipment used in a canister transfer and installation vehicle, a description regarding the operation and maintenance of the equipment, as well as a cost estimate. Specific vehicles will be manufactured for all canister types in order to minimize the height of the disposal tunnels. This report is only focused on a transfer and installation vehicle for OL1-2 fuel canisters. Detailed designing and selection of final components have not yet been carried out. The report also describes the vehicle's requirements for the structures of a repository system, as well as actions in possible malfunction or fault situations. The spent fuel canister is brought from an encapsulation plant by a canister lift down to the repository level. The fuel canister is driven from the canister lift by an automated guided vehicle onto a canister hoist at a canister loading station. The canister transfer and installation vehicle is waiting for the canister with its radiation shield in an upright position above the canister hoist. The hoist carries the canister upward until the vehicle's own lifting means grab hold of the canister and raise it up into the vehicle's radiation shield. This is followed by turning the radiation shield to a transport position and by closing it in a radiation-proof manner against a rear radiation shield. The vehicle is driven along the central tunnel into the disposal tunnel and parked on top of the deposition hole. The vehicle's radiation shield is turned to the upright position and the canister is lowered with the vehicle's hydraulic winches into a bentonite-lined deposition hole. The radiation shield is turned back to the transport position and the vehicle can be driven out of the disposal tunnel

  16. Physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Toepfer, K.

    1989-01-01

    This contribution investigates the possible danger and the legal basis of physical protection and explains the current, integrated system provided for, as well as the underlying possible scenarios of an assault: (1) by a violent crowd of aggressors outside the installation, (2) by a small group of aggressors outside the installation, (3) by a person allowed to enter (internal assault). The physical protection system supplements the internal safety measures to enhance protection against hypothetical and possible acts of terrorism or other criminal assault. The system covers external and internal controlled areas, access monitoring, physical protection control room and service, security checks of the personnel, and activities to disclose sabotage. Some reflections on the problem field between security controls and the constitutional state conclude this contribution. (orig./HSCH) [de

  17. Installation package for a sunspot cascade solar water heating system

    Science.gov (United States)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  18. Keeping the Future Bright: Department of Defense (DOD) Sustainable Energy Strategy for Installations

    Science.gov (United States)

    2016-04-04

    still slightly more expensive to install than utility-scale PV, distributed solar installation costs decreased in half since 2008, and this power source...has been privately purchased and installed . However, utility companies are beginning to purchase and install solar panel systems on homes and...front installation and hardware costs. This new initiative accounted for more than 72 % of U.S. residential solar installations in 2Ol4. Over the past

  19. Laser ionization installation for measurement of atomic beam parameters

    CERN Document Server

    Tukhlibaev, O; Khalilov, E E; Alimov, U Z

    2002-01-01

    The design of the laser ionization installation for determination of the atomic beam intensity, density and spatial structure is described. The method of the atoms laser resonance staged photoionization is applied in the installation. The above installation consists of two lasers on the dyestuffs, the atomizer, the ionization system and the ion signals registration system. The results of studies on the spatial structure of the In atoms beam are presented. The proposed method provides for the spatial resolution at the level of 10-100 mu m

  20. Volcanic Hazards in Site Evaluation for Nuclear Installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-10-15

    This publication provides comprehensive and updated guidance for site evaluation in relation to volcanic hazards. It includes recommendations on assessing the volcanic hazards at a nuclear installation site, in order to identify and characterize, in a comprehensive manner, all potentially hazardous phenomena that may be associated with future volcanic events. It describes how some of these volcanic phenomena may affect the acceptability of the selected site, resulting in exclusion of a site or determining the corresponding design basis parameters for the installation. This Safety Guide is applicable to both existing and new sites, and a graded approach is recommended to cater for all types of nuclear installations. Contents: 1. Introduction; 2. Overview of volcanic hazard assessment; 3. General recommendations; 4. Necessary information and investigations (database); 5. Screening of volcanic hazards; 6. Site specific volcanic hazard assessment; 7. Nuclear installations other than nuclear power plants; 8. Monitoring and preparation for response; 9. Management system for volcanic hazard assessment; Annex I: Volcanic hazard scenarios; Annex II: Worldwide sources of information.

  1. Safety requirements and radiological protection for ore installations

    International Nuclear Information System (INIS)

    2003-06-01

    This norm establishes the safety and radiological protection requirements for mining installations which manipulates, process and storing ores, raw materials, steriles, slags and wastes containing radionuclides of the uranium and thorium natural series, simultaneously or separated, and which can cause undue exposures to the public and workers, at anytime of the functioning or pos operational stage. This norm applies to the mining installations activities, suspended or which have ceased their activities before the issue date of this norm, destined to the mining, physical, chemical and metallurgical processing, and the industrialization of raw materials and residues containing associated radionuclides from the natural series of uranium and thorium, including the stages of implantation, operation and decommissioning of the installation

  2. A method of installing a reactor container

    International Nuclear Information System (INIS)

    Hayashi, Kenji; Murakawa, Hisao.

    1975-01-01

    Object: To achieve exact installation of a reactor container at a site. Structure: A pole is set upright at the center of a cylindrical base portion, a plurality of beams are disposed around the pole in a radial fashion to form a cone, a plurality of steel plates are mounted successively around the cone through a ring, and the steel plates are welded to each other to assemble and install a reactor container at the same time. (Kamimura, M.)

  3. Study on installation of the submersible mixer

    International Nuclear Information System (INIS)

    Tian, F; Shi, W D; He, X H; Xu, Y H; Jiang, H

    2013-01-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice

  4. On-line sodium and cover as purity monitors gas operating tools at EBR-II

    International Nuclear Information System (INIS)

    Smith, C.R.F.; Richardson, W.J.; Holmes, J.T.

    1976-01-01

    Plugging temperature indicators, electrochemical oxygen meters and hydrogen diffusion meters are the on-line sodium purity monitors now in use at EBR-II. On-line gas chromatographs are used to monitor helium, hydrogen, oxygen and nitrogen impurities in the argon cover gases. Monitors for tritium-in-sodium and for hydrocarbons-in-cover gas have been developed and are scheduled for installation in the near future. An important advantage of on-line monitors over the conventional grab-sampling techniques is the speed of response to changing reactor conditions. This helps us to identify the source of the impurity, whether the cause may be transient or constant, and take corrective action as necessary. The oxygen meter is calibrated monthly against oxygen in sodium determined by the vanadium wire equilibration method. The other instruments either do not require calibration or are self-calibrating. The ranges, sensitivity and response times of all of the on-line purity monitors has proven satisfactory under EBR-II operating conditions

  5. Bypass line assisted start-up of a loop heat pipe with a flat evaporator

    International Nuclear Information System (INIS)

    Boo, Joon Hong; Jung, Eui Guk

    2009-01-01

    Loop heat pipes often experience start-up problems especially under low thermal loads. A bypass line was installed between the evaporator and the liquid reservoir to alleviate the difficulties associated with start-up of a loop heat pipe with flat evaporator. The evaporator and condenser had dimensions of 40 mm (W) by 50 mm (L). The wall and tube materials were stainless steel and the working fluid was methanol. Axial grooves were provided in the flat evaporator to serve as vapor passages. The inner diameters of liquid and vapor transport lines were 2 mm and 4 mm, respectively, and the length of the two lines was 0.5 m each. The thermal load range was up to 130 W for horizontal alignment with the condenser temperature of 10 .deg. C. The experimental results showed that the minimum thermal load for start-up was lowered by 37% when the bypass line was employed

  6. The Swiss nuclear installations. Annual report 1993

    International Nuclear Information System (INIS)

    1994-08-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration of final disposal facilities for radwaste and the interim radwaste storage facilities in Switzerland. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1993, is judged as good by HSK. (author) 10 figs., 11 tabs

  7. The Swiss nuclear installations. Annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs.

  8. Commissioning status of the decelerator test beam line in CTF3

    CERN Document Server

    Adli, E; Lillestol, R; Olvegaard, M; Syratchev, I; Carrillo, D; Toral, F; Faus-Golfe, A; Garcia-Garrigos, J J; Kubyshin, Y; Montoro, G

    2010-01-01

    The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasibility of the concepts for a compact linear collider. The test beam line (TBL) recently added to the CTF3 machine was designed to study the CLIC decelerator beam dynamics and 12 GHz power production. The beam line consists of a FODO lattice with high precision BPM’s and quadrupoles on movers for precise beam alignment. A total of 16 Power Extraction and Transfer Structures (PETS) will be installed in between the quadrupoles to extract 12 GHz power from the drive beam provided by the CTF3 machine. The CTF3 drive beam with a bunch-train length of 140 ns, 12 GHz bunch repetition frequency and an average current over the train of up to 28 A will be injected into the test beam line. Each PETS structure will produce 135 MW of 12 GHz power at nominal current. The beam will have lost more than 50 % of its initial energy of 150 MeV at the end of the beam line and will contain particles with energies between 65 MeV and 1...

  9. An after-market, five-port vertical beam line extension for the PETtrace

    DEFF Research Database (Denmark)

    Barnhart, T. E.; Engle, J. W.; Severin, Gregory

    2012-01-01

    Most commercial cyclotrons intended for medical isotope production provide a limited number of beam ports crowded into a minimal vault space. Taking advantage of our new lab construction, we planned and installed a beam-line on port ♯2 of our GEMS PETtrace to bring beam to an additional 5 target...... positions. These are oriented in the vertical plane, with the downward directed beam well suited for molten target substrates. © 2012 American Institute of Physics...

  10. Beam Transfer Line Design for a Plasma Wakefield Acceleration Experiment (AWAKE) at the CERN SPS

    CERN Document Server

    Bracco, C; Brethoux, D; Clerc, V; Goddard, B; Gschwendtner, E; Jensen, L K; Kosmicki, A; Le Godec, G; Meddahi, M; Muggli, P; Mutin, C; Osborne, O; Papastergiou, K; Pardons, A; Velotti, F M; Vincke, H

    2013-01-01

    The world’s first proton driven plasma wakefield acceleration experiment (AWAKE) is presently being studied at CERN. The experimentwill use a high energy proton beam extracted from the SPS as driver. Two possible locations for installing the AWAKE facility were considered: the West Area and the CNGS beam line. The previous transfer line from the SPS to the West Area was completely dismantled in 2005 and would need to be fully re-designed and re-built. For this option, geometric constraints for radiation protection reasons would limit the maximum proton beam energy to 300 GeV. The existing CNGS line could be used by applying only minor changes to the lattice for the final focusing and the interface between the proton beam and the laser, required for plasma ionisation and bunch-modulation seeding. The beam line design studies performed for the two options are presented.

  11. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    Science.gov (United States)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  12. Improved gas installations and services. Phase 1: Analysis project. Part report

    International Nuclear Information System (INIS)

    Nielsen, K.J.

    1996-05-01

    As Danish gas companies receive a large number of complaints related to the installation and operation of gas installations it was suggested that a course for personnel should be established in order to raise the standard of services and installation requirements. The first phase of the described project was to evaluate the quality of the gas installers' services so as to determine which aspects of installation and services should be emphasized during such a course. Interviews were carried out and questionnaires (illustrated within the document) sent out to installaters etc. Recommendations include that the level of information given to customers should be raised, also in relation to maintenance, and that installation should be improved. Analyses of the degree of customers' satisfaction, of the nature of the quality of services etc. expected, subjects for further training in this area and details of the training system are dealt with

  13. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    CERN Document Server

    De Salvo, Alessandro; The ATLAS collaboration; Sanchez, Arturo; Smirnov, Yuri

    2015-01-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  14. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  15. Using the Spatial Distribution of Installers to Define Solar Photovoltaic Markets

    Energy Technology Data Exchange (ETDEWEB)

    O' Shaughnessy, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Nemet, Gregory F. [Univ. of Wisconsin, Madison, WI (United States); Darghouth, Naim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-09-01

    Solar PV market research to date has largely relied on arbitrary jurisdictional boundaries, such as counties, to study solar PV market dynamics. This paper seeks to improve solar PV market research by developing a methodology to define solar PV markets. The methodology is based on the spatial distribution of solar PV installers. An algorithm is developed and applied to a rich dataset of solar PV installations to study the outcomes of the installer-based market definitions. The installer-based approach exhibits several desirable properties. Specifically, the higher market granularity of the installer-based approach will allow future PV market research to study the relationship between market dynamics and pricing with more precision.

  16. Managing for safety at nuclear installations

    International Nuclear Information System (INIS)

    1996-01-01

    This publication, by the Health and Safety Executive's (HSE's) Nuclear Safety Division (NSD), provides a statement of the criteria the Nuclear Installations Inspectorate (NII) uses to judge the adequacy of any proposed or existing system for managing a nuclear installation in so far as it affects safety. These criteria have been developed from the basic HSE model, described in the publication Successful health and safety management that applies to industry generally, in order to meet the additional needs for managing nuclear safety. In addition, the publication identifies earlier studies upon which this work was based together with the key management activities and outputs. (Author)

  17. Natural gas fuelling stations installation code

    Energy Technology Data Exchange (ETDEWEB)

    Barrigar, C; Burford, G; Adragna, M; Hawryn, S

    2004-07-01

    This Canadian Standard applies to natural gas fuelling stations that can be used for fleet and public dispensing operations. This document is divided into 11 sections that address the scope of the Standard; definitions and reference publications; general requirements; compressors; storage; dispensing; flow control devices; storage vessel dispatch and receiving; design, installation and testing of piping, tubing and fittings; and installation of vehicle refuelling appliances (VRAs) connected to storage piping. The most recent revision to the Standard includes requirements for indoor fuelling of natural gas vehicles. This Standard, like all Canadian Standards, was subject to periodic review and was most recently reaffirmed in 2004. tabs., figs.

  18. Poultry farming buildings. Natural gas heating. Guidebook of installation rules; Batiments d`elevage avicole. Chauffage au gaz. Guide des regles d`installation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The technical and economical performances of a poultry farm are greatly influenced by the mastery of ambient temperature during the first days of husbandry. The natural gas space heating installation must answer these requirements and also respect all safety rules concerning the personnel and the animals. In order to answer the questions of poultry farming professionals, the technical association of the natural gas industry (ATG) in France and the Groupama insurance company have redefined the new version of this brochure which integrates the recent technological advances and defines the minimum quality and safety rules required to achieve a natural gas heating installation. The different topics presented are: the gas supply (aerial fixed reservoirs), the general distribution panel (location, command systems, regulation systems for LPG installations, electrical equipments), the distribution pipes (general supply, indoor pipes, flexible pipes, pipe fittings), the heating systems (power, choice, power supply, fastening, air renewal), the check and sign and the start-up of the installation, the periodical control and maintenance operations. (J.S.)

  19. Nuclear installations abroad the accident risks and their potential consequences

    Energy Technology Data Exchange (ETDEWEB)

    Turvey, F J [Radiological Protection Inst. of Ireland (Ireland)

    1996-10-01

    This paper endeavors to assess the threat to Ireland from severe accidents at civil nuclear installations. Among the various types of nuclear installations worldwide, reactors and reprocessing plants are considered to be the most threatening and so the paper focuses on these. The threat is assumed to be a function of the risk of severe accidents at the above types of installations and the probability of unfavourable weather conditions carrying the radioactive releases to Ireland. Although nuclear installations designed in eastern Europe and Asia are less safe than others, the greatest threat to Ireland arises from nearby installations in the UK. The difficulty of measuring the probabilities and consequences of severe nuclear accidents at nuclear installations in general is explained. In the case of the UK installations, this difficulty is overcome to some degree by using values of `tolerable` risk adopted by the national nuclear regulator to define the radiotoxic releases from nuclear accidents. These are used as input to atmospheric dispersion models in which unfavourable weather conditions for Ireland are assumed and radiation doses are calculated to members of the Irish public. No countermeasures, such as sheltering, are assumed. In the worst cast scenario no deaths would be expected in Ireland in the immediate aftermath of the accident however, an increase in cancers over a period of 25 years or so would be expected assuming present-day models for the effect of low level radiation are valid.

  20. Nuclear installations abroad the accident risks and their potential consequences

    International Nuclear Information System (INIS)

    Turvey, F.J.

    1996-01-01

    This paper endeavors to assess the threat to Ireland from severe accidents at civil nuclear installations. Among the various types of nuclear installations worldwide, reactors and reprocessing plants are considered to be the most threatening and so the paper focuses on these. The threat is assumed to be a function of the risk of severe accidents at the above types of installations and the probability of unfavourable weather conditions carrying the radioactive releases to Ireland. Although nuclear installations designed in eastern Europe and Asia are less safe than others, the greatest threat to Ireland arises from nearby installations in the UK. The difficulty of measuring the probabilities and consequences of severe nuclear accidents at nuclear installations in general is explained. In the case of the UK installations, this difficulty is overcome to some degree by using values of 'tolerable' risk adopted by the national nuclear regulator to define the radiotoxic releases from nuclear accidents. These are used as input to atmospheric dispersion models in which unfavourable weather conditions for Ireland are assumed and radiation doses are calculated to members of the Irish public. No countermeasures, such as sheltering, are assumed. In the worst cast scenario no deaths would be expected in Ireland in the immediate aftermath of the accident however, an increase in cancers over a period of 25 years or so would be expected assuming present-day models for the effect of low level radiation are valid

  1. The effectiveness of the installation of a mobile voice communication system in a university hospital.

    Science.gov (United States)

    Hanada, Eisuke; Fujiki, Tadayoshi; Nakakuni, Hideaki; Sullivan, Corbet Vernon

    2006-04-01

    In large hospitals, collaborative clinical practice is currently emphasized, with members of various departments expected to work as a team. The importance of accurate communication among the team members is of utmost importance. To improve such communication, the introduction of mobile voice communication systems has received much attention in Japan. Shimane University Hospital also introduced a Personal Handy-phone System (PHS) for doctors. In the traditional setting, much time was wasted searching for doctors through multiple calls on fixed-line telephones. In order to measure the effectiveness of our system, the change in the number of calls made on fixed-line telephones before and after PHS installation was compared. The total number of calls was reduced by more than 35%, and the number of calls to the wards on weekdays was reduced by half. Mobile telecommunication systems with small output power, such as PHS, are known to cause little interference with medical devices which makes it possible to use mobile voice communication safely in hospitals. The improvement in communication by this systems resulted in an improvement in labor efficiency.

  2. Design of modified annulus air sampling system for the detection of leakage in waste transfer line

    International Nuclear Information System (INIS)

    Deokar, U.V; Khot, A.R.; Mathew, P.; Ganesh, G.; Tripathi, R.M.; Srivastava, Srishti

    2018-01-01

    Various liquid waste streams are generated during the operation of reprocessing plant. The High Level (HL), Intermediate Level (IL) and Low Level (LL) liquid wastes generated, are transferred from reprocessing plant to Waste Management Facility. These respective waste streams are transferred through pipe-in-pipe lines along the shielded concrete trench. For detection of radioactive leakage from primary waste transfer line into secondary line, sampling of the annulus air between the two pipes is carried out. The currently installed pressurized annulus air sampling system did not have online leakage detection provision. Hence, there are chances of personal exposure and airborne activity in the working area. To overcome these design flaws, free air flow modified online annulus air sampling system with more safety features is designed

  3. Installation of the Gbar LINAC

    CERN Multimedia

    Maximilien, Brice

    2017-01-01

    Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

  4. A four-detector spectrometer for e--γ PAC on-line with the ISOLDE-CERN isotope separator

    International Nuclear Information System (INIS)

    Marques, J.G.; Correia, J.G.; Melo, A.A.; Silva, M.F. da; Soares, J.C.

    1995-01-01

    A four-detector e - -γ spectrometer has been installed on-line with the ISOLDE isotope separator. The spectrometer consists of two magnetic lenses for detection of conversion electrons, and two BaF 2 scintillators for γ-ray detection. The spectrometer has been equipped with a 20 kV pre-acceleration system which enables detection of conversion electrons down to 2 keV. Implantation and measurement can be performed simultaneously on a large temperature range by heating or cooling the sample holder. The advantages of using the e - -γ PAC technique on-line at ISOLDE are discussed. (orig.)

  5. Bridging interpersonal installation art with tangible business modeling

    DEFF Research Database (Denmark)

    Mitchell, Robb

    2012-01-01

    This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction.......This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction....

  6. Childhood cancer and nuclear installations: a review

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1998-01-01

    Many epidemiological studies of childhood cancer around nuclear installations have been conducted in recent years. This article reviews results from Great Britain and elsewhere. Geographical studies have indicated raised risks of childhood leukaemia around some British nuclear installations. However, environmental assessments suggest that the findings are unlikely to be due to radioactive releases from the sites. Case-control studies have allowed more detailed investigation of putative risk factors than is possible from geographical studies. In particular, a recent national study in Britain does not support the hypothesis raised by an earlier study in West Cumbria that paternal radiation exposure prior to conception may increase the risk of leukaemia and non-Hodgkin's lymphoma in offspring. Other studies suggest that childhood leukaemia may have an infective basis, although there is still uncertainty about whether this would explain the findings around nuclear installations. The UK Childhood Cancer Study may provide more information on the causes of these diseases. (author)

  7. Update on Geothermal Direct-Use Installations in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Beckers, Koenraad J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Snyder, Diana M. [Georgia State University

    2017-02-15

    Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.

  8. Rapid installation of numerical models in multiple parent codes

    Energy Technology Data Exchange (ETDEWEB)

    Brannon, R.M.; Wong, M.K.

    1996-10-01

    A set of``model interface guidelines``, called MIG, is offered as a means to more rapidly install numerical models (such as stress-strain laws) into any parent code (hydrocode, finite element code, etc.) without having to modify the model subroutines. The model developer (who creates the model package in compliance with the guidelines) specifies the model`s input and storage requirements in a standardized way. For portability, database management (such as saving user inputs and field variables) is handled by the parent code. To date, NUG has proved viable in beta installations of several diverse models in vectorized and parallel codes written in different computer languages. A NUG-compliant model can be installed in different codes without modifying the model`s subroutines. By maintaining one model for many codes, MIG facilitates code-to-code comparisons and reduces duplication of effort potentially reducing the cost of installing and sharing models.

  9. Decommissioning nuclear installations

    International Nuclear Information System (INIS)

    Dadoumont, J.

    2010-01-01

    When a nuclear installation is permanently shut down, it is crucial to completely dismantle and decontaminate it on account of radiological safety. The expertise that SCK-CEN has built up in the decommissioning operation of its own BR3 reactor is now available nationally and internationally. Last year SCK-CEN played an important role in the newly started dismantling and decontamination of the MOX plant (Mixed Oxide) of Belgonucleaire in Dessel, and the decommissioning of the university research reactor Thetis in Ghent.

  10. A novel transmission line protection using DOST and SVM

    Directory of Open Access Journals (Sweden)

    M. Jaya Bharata Reddy

    2016-06-01

    Full Text Available This paper proposes a smart fault detection, classification and location (SFDCL methodology for transmission systems with multi-generators using discrete orthogonal Stockwell transform (DOST. The methodology is based on synchronized current measurements from remote telemetry units (RTUs installed at both ends of the transmission line. The energy coefficients extracted from the transient current signals due to occurrence of different types of faults using DOST are being utilized for real-time fault detection and classification. Support vector machine (SVM has been deployed for locating the fault distance using the extracted coefficients. A comparative study is performed for establishing the superiority of SVM over other popular computational intelligence methods, such as adaptive neuro-fuzzy inference system (ANFIS and artificial neural network (ANN, for more precise and reliable estimation of fault distance. The results corroborate the effectiveness of the suggested SFDCL algorithm for real-time transmission line fault detection, classification and localization.

  11. Project development and commercialisation of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    2000-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects, usually lasting 7-10 years, has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems, licensed to Australian companies, are used world-wide. They are now the market leaders for radioisotope gauges in their application field. The third, the multiphase flow meter, was licensed in 1997 to an international company. This meter has even greater potential than the other two systems for economic benefit from its use and for numbers of installations. (author)

  12. Experimental complex to study nuclei far from beta-stability line-isol-facility YASNAPP-2

    International Nuclear Information System (INIS)

    Kalinnikov, V.G.; Gromov, K.Ya.; Ianicki, M.

    1990-01-01

    A complex of installations (complex YASNAPP-2), developed for spectroscopic investigations of short-lived isotopes and working on the line of the proton beam of the JINR phasotron, is briefly described. The first physics results of investigations of short-lived nuclides in the rare earth region are presented: the alpha-spectrum of A=155 and the gamma-gamma coincidence spectrum for A=157. 25 refs.; 9 figs.; 2 tabs

  13. Order of 27 October 1971 on exemptions from classification as radioactive installations

    International Nuclear Information System (INIS)

    1971-01-01

    This Order was made in implementation of Section 2 of the 1964 Act on nuclear activities which provides that installations where the level of radiation produced entails no significant hazard shall be excluded from the classification of radioactive installations. Consequently, the Order specifies the activity thresholds for radionuclides below which installations containing them are not considered as radioactive installations. (NEA) [fr

  14. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  15. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2002-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2002 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2002. There are two installations mentioned in the statement: Dungeness B and Heysham 1. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  16. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  17. Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8

    CERN Document Server

    Goddard, B; Risselada, Thys

    2004-01-01

    Beam transfer from the CERN Super Proton Synchrotron (SPS) to the Large Hadron Collider (LHC) will be done through the two transfer lines TI 2 and TI 8, presently under construction, with a combined length of about 5.6 km. The final layout, optics design and correction scheme for these lines will be presented. The requirement of simultaneously matching their geometry and optics with that of the LHC will be treated, including the methodology for alignment of the elements along the line and a proposed solution in the final matching section. After the commissioning of the short transfer line TT40 just upstream of TI 8 in 2003, beam tests of the whole of TI 8 are scheduled for autumn 2004, with the aim to validate many of the new features and mechanisms involved in the future control and operation of these lines. The status of the installation will be described, comprising the progress with infrastructure, services and line elements. An outlook will be given for the work remaining until 2007.

  18. Installation for fatigue testing of materials at cryogenic temperatures

    International Nuclear Information System (INIS)

    Abushenkov, I.D.; Chernetskij, V.K.; Il'ichev, V.Ya.

    1986-01-01

    A new installation for mechanical fatigue tests of structural material samples is described, in which the possibility to conduct tests in the range of lower temperatures (4.2-300 K) is ensured. The installation permits to carry out fatigue tests using the method of axial loading of annular (up to 6 mm in diameter) and plane (up to 12 mm wide) samples during symmetric, asymmetric and pulsing loading cycles. It is shown that the installation suggested has quite extended operation possibilities and, coincidentally, it is characterized by design simplicity, compactness, comparatively low metal consumption and maintenance convenience

  19. Universal smoking installation of rotary type

    Directory of Open Access Journals (Sweden)

    Aminov V. A.

    2017-11-01

    Full Text Available According to the research carried out by the authors the most technological installations for producing meat and fish products are oriented only on one type of raw material (meat or fish, as well as the kind of smoking (cold or hot. Limitations are related to the maximum temperature of the drying agent that affects the product; presence of the system for maintaining the relative humidity of the air mixture; presence of the smoke cooling system coming from the smoke generator and a number of other factors. Enterprises expanding the range of products are forced to purchase new equipment. With a limited production area especially for small businesses this is not convenient. In the paper, a universal smoking installation of the rotor type (USIRT is considered for the production of both meat and fish products using cold or hot smoking. The installation is oriented to a wide range of products. The presence of the smoke cooling system will allow the production of cold smoking products, the presence of the dehumidification and humidification system for the smoke-air mixture will ensure the maintenance of the required technological regime for producing fish and meat products. Based on the example of cold smoking studies have shown that the duration of the process should be reduced while maintaining the quality of the product. For this purpose, ultrasonic (US vibrations have been applied to the smoke-air mixture in USIRT. The studies have been carried out to identify the best type of ultrasound radiators capable of transmitting vibrations of the installation metal surface and from it to pass into the smoke-air mixture in order to intensify the process of cold smoking. The necessary power of ultrasonic generators has been determined. Comparative results of technological processes with the application of ultrasound in the production of fish products have been presented.

  20. Parametric Design and Rapid Prototyping of Installation Box for Vehicle Terminal PCB

    Directory of Open Access Journals (Sweden)

    Wang Xingxing

    2016-01-01

    Full Text Available Installation box for vehicle terminal PCB (Printed Circuit Board was took as research object, which is encountered in the process of project developing. Vehicle terminal PCB in actual development process was set as an example, point cloud data were acquired by three coordinate measuring method; Imageware software was used to reconstruct the vehicle terminal PCB model, basic size parameters of vehicle terminal PCB can be got and then design parameters of installation box for vehicle terminal PCB can be determined. Design of the installation box for vehicle terminal PCB was completed based on Solidworks software, then 3D modeling and 2D drawing of installation box for vehicle terminal PCB was gained. Up Plus 2 rapid prototype machine was used to manufacture installation box for vehicle terminal PCB rapidly based on 3D printing technology, then prototype of installation box for vehicle terminal PCB was obtained. It is of certain engineering significant for single (small amount manufacturing of installation box for general PCB.

  1. To Solution of Classical Problem Pertaining to Magnetic Interference of Overhead Power Transmission Line on Extended Conducting Communications

    Directory of Open Access Journals (Sweden)

    V. I. Glushko

    2013-01-01

    Full Text Available The paper considers a problem pertaining to magnetic interference of overhead power transmission lines and high-voltage bus bars of electrical installations on extended conducting communications and secondary circuits of relay protection and automation. A simplified task solution has been obtained on the basis of the Carson integral approximation.

  2. The development of insecticide-treated durable wall lining for malaria control: insights from rural and urban populations in Angola and Nigeria

    Directory of Open Access Journals (Sweden)

    Messenger Louisa A

    2012-09-01

    Full Text Available Abstract Background Durable lining (DL is a deltamethrin-impregnated polyethylene material, which is designed to cover domestic walls that would normally be sprayed with residual insecticide. The operational success of DL as a long-lasting insecticidal substrate will be dependent on a high level of user acceptability as households must maintain correctly installed linings on their walls for several years. Preliminary trials were undertaken to identify a material to develop into a marketable wall lining and to assess its level of acceptability among rural and urban populations. Methods In Angola (n=60, prototype DL and insecticide-treated plastic sheeting (ITPS were installed on urban house walls and ceilings, respectively, and acceptability was compared to indoor residual spraying (IRS (n=20 using a knowledge, attitude and practice (KAP questionnaire. In Nigeria (n=178, three materials (prototype DL, ITPS and insecticide-treated wall netting were distributed among rural and urban households. User opinions were gathered from focus group discussions, in-depth interviews and KAP questionnaires. Results In Angola, after two weeks, the majority of participants (98% expressed satisfaction with the products and identified the killing of insects as the materials’ principal benefits (73%. After one year, despite a loss of almost 50% of households to refugee repatriation, all 32 remaining households still asserted that they had liked the DL/ITPS in their homes and given the choice of intervention preferred DL/ITPS to IRS (94% or insecticide-treated nets (78%. In Nigeria, a dichotomy between rural and urban respondents emerged. Rural participants favoured wall adornments and accepted wall linings because of their perceived decorative value and entomological efficacy. By contrast, urban households preferred minimal wall decoration and rejected the materials based upon objections to their aesthetics and installation feasibility. Conclusions The high level

  3. The development of insecticide-treated durable wall lining for malaria control: insights from rural and urban populations in Angola and Nigeria

    Science.gov (United States)

    2012-01-01

    Background Durable lining (DL) is a deltamethrin-impregnated polyethylene material, which is designed to cover domestic walls that would normally be sprayed with residual insecticide. The operational success of DL as a long-lasting insecticidal substrate will be dependent on a high level of user acceptability as households must maintain correctly installed linings on their walls for several years. Preliminary trials were undertaken to identify a material to develop into a marketable wall lining and to assess its level of acceptability among rural and urban populations. Methods In Angola (n=60), prototype DL and insecticide-treated plastic sheeting (ITPS) were installed on urban house walls and ceilings, respectively, and acceptability was compared to indoor residual spraying (IRS) (n=20) using a knowledge, attitude and practice (KAP) questionnaire. In Nigeria (n=178), three materials (prototype DL, ITPS and insecticide-treated wall netting) were distributed among rural and urban households. User opinions were gathered from focus group discussions, in-depth interviews and KAP questionnaires. Results In Angola, after two weeks, the majority of participants (98%) expressed satisfaction with the products and identified the killing of insects as the materials’ principal benefits (73%). After one year, despite a loss of almost 50% of households to refugee repatriation, all 32 remaining households still asserted that they had liked the DL/ITPS in their homes and given the choice of intervention preferred DL/ITPS to IRS (94%) or insecticide-treated nets (78%). In Nigeria, a dichotomy between rural and urban respondents emerged. Rural participants favoured wall adornments and accepted wall linings because of their perceived decorative value and entomological efficacy. By contrast, urban households preferred minimal wall decoration and rejected the materials based upon objections to their aesthetics and installation feasibility. Conclusions The high level of acceptability

  4. Installation for analytic chemistry under irradiation

    International Nuclear Information System (INIS)

    Fradin, J.; Azoeuf, P.; Guillon, A.

    1966-01-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [fr

  5. Seismic Hazards in Site Evaluation for Nuclear Installations. Specific Safety Guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-08-15

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear installations. It supplements the Safety Requirements publication on Site Evaluation for Nuclear Installations. The present publication provides guidance and recommends procedures for the evaluation of seismic hazards for nuclear power plants and other nuclear installations. It supersedes Evaluation of Seismic Hazards for Nuclear Power Plants, IAEA Safety Standards Series No. NS-G-3.3 (2002). In this publication, the following was taken into account: the need for seismic hazard curves and ground motion spectra for the probabilistic safety assessment of external events for new and existing nuclear installations; feedback of information from IAEA reviews of seismic safety studies for nuclear installations performed over the previous decade; collective knowledge gained from recent significant earthquakes; and new approaches in methods of analysis, particularly in the areas of probabilistic seismic hazard analysis and strong motion simulation. In the evaluation of a site for a nuclear installation, engineering solutions will generally be available to mitigate, by means of certain design features, the potential vibratory effects of earthquakes. However, such solutions cannot always be demonstrated to be adequate for mitigating the effects of phenomena of significant permanent ground displacement such as surface faulting, subsidence, ground collapse or fault creep. The objective of this Safety Guide is to provide recommendations and guidance on evaluating seismic hazards at a nuclear installation site and, in particular, on how to determine: (a) the vibratory ground motion hazards, in order to establish the design basis ground motions and other relevant parameters for both new and existing nuclear installations; and (b) the potential for fault displacement and the rate of fault displacement that could affect the feasibility of the site or the safe operation of the installation at

  6. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  7. 32 CFR 643.121 - Private organizations on DA installations.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Private organizations on DA installations. 643.121 Section 643.121 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY... DA installations. (a) AR 210-1 defines and classifies private organizations, such as thrift shops and...

  8. Completion of installation of DT and RPC chambers before Cosmic Challenge

    CERN Multimedia

    Mimmo Dattola

    2006-01-01

    All the drift tube ("DT") and resistive plate chambers ("RPC") packages foreseen to be installed in the central barrel ring ("YB0") before the magnet test have been installed (some are missing in the photograph but have since been installed). These silver-coloured rectangular boxes in the gaps between the steel of the rings (red in the image) detect muons. Chambers for Sectors 4 and 5 (sector 1 is at the 9 o'clock position and the counting is clockwise) as well as a couple of chambers in the support "feet" (sectors 9 and 11) will be installed after the magnet test. Chambers for sectors 1 and 7 will be installed in the underground cavern ("UXC") - the latter will be in the places used for the lifting and lowering of the ring.

  9. Accuracy of computer-assisted cervicle pedicle screw installation

    International Nuclear Information System (INIS)

    Zhang Honglei; Zhou Dongsheng; Jang Zhensong

    2009-01-01

    Objective: To investigate the accuracy of computer-assisted cervical pedicle screw installation and the reason of screw malposition. Methods: A total of 172 cervical pedicle screws were installed by computer-assisted navigation for 30 patients with lower cervical spinal diseases. All the patients were examined by X-ray and CT after operation. Screw's position and direction were measured on the sagittal and transectional images of intraoperative navigation and post-operative CT. Then linear regression analysis was taken between navigational and post-operative CT's images. Results: Two screws perforated the upper pedicle wall, 3 perforated the lateral pedicle wall.There was a positive linear correlation between navigational and post-operative CT's images. Conclusion: Computer-assisted navigation can provide the high accuracy of cervical pedicle screw installation and excursion phenomenon is reason of screw malposition. (authors)

  10. The Management System for Nuclear Installations. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a) To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b) As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c) To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a) Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b) Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c) Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d) Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e) Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear

  11. Small break loss of coolant accident analysis of advanced PWR plant designs utilizing DVI line venturis

    International Nuclear Information System (INIS)

    Kemper, Robert M.; Gagnon, Andre F.; McNamee, Kevin; Cheung, Augustine C.

    1995-01-01

    The Westinghouse Advanced Passive and evolutionary Pressurizer Water Reactors (i.e. AP600 and APWR) incorporate direct vessel injection (DVI) of emergency core coolant as a means of minimizing the potential spilling of emergency core cooling water during a loss of coolant accident (LOCA). As a result, the most limiting small break LOCA (SBLOCA) event for these designs, with respect core inventory makeup capability, is a postulated double ended rupture of one of the DVI lines. This paper presents the results of a design optimization study that examines the installation of a venturi in the DVI line as a means of limiting the reactor coolant lost from the reactor vessel. The comparison results demonstrate that by incorporating a properly sized venturi in the DVI line, core uncovery concerns as a result of a DVI line break can be eliminated for both the AP600 and APWR plants. (author)

  12. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  13. Tolley's industrial and commercial gas installation practice

    CERN Document Server

    Hazlehurst, John

    2010-01-01

    This is the third of three essential reference volumes for those concerned with the installation and servicing of domestic and industrial gas equipment. This volume explains the basic principles underlying the practical and theoretical aspects of installing and servicing gas appliances and associated equipment, from the basics of combustion, to burners, pressure and flow, transfer of heat, controls, as well as materials and processes, electrical aspects, and metering and measuring devices. Covering both Natural Gas and Liquefied Petroleum Gas, the many illustrations and worked examples include

  14. Beam line to S155

    CERN Multimedia

    1977-01-01

    The experiment S155 was designed by the Orsay (CSNM-CNRS) Collaboration to observe the properties of exotic light nuclei. It was installed in the PS neutrino tunnel. The photo shows a mass spectrometer (in the background) on line with the PS proton beam which arrives (bottom, right) from the fast extraction FE74. Roger Fergeau stands on the left. The alkaline isotopes produced in the carbon-uranium target heated at 2000°C were swiftly extracted, mass separated, and brought to a detector behind the shielding. Sodium 34 (11 protons and 23 neutrons) was observed and its half-life of only 5 ms was measured. The excited levels 2+ of Magnesium 30 and Magnesium 32 (Sodium descendants) were localised, and the magic number 20 was found to vanish. Thus, the discovery made earlier for Sodium 30 and Sodium 32, with the same apparatus, was confirmed. (See also photo 7706511.)

  15. A study on the behaviour of concrete lining and rock mass during shaft excavation at the Horonobe URL project. Part 2

    International Nuclear Information System (INIS)

    Tsusaka, Kimikazu; Inagaki, Daisuke; Koike, Masashi; Ijiri, Yuji; Hatsuyama, Yoshihiro

    2011-01-01

    The authors investigated concrete lining stress caused by excavation of a 6.5 m diameter access shaft at the Horonobe Underground Research Laboratory. They analyzed lining stress distribution by three-dimensional analysis. The stress distribution was also measured with ten stress meters installed in each section in the direction of maximum and minimum initial stresses. As a result, it was clarified that the maximum and minimum lining stresses occurred in the inner bottom in the direction of the minimum initial stress and in the inner top in the direction of the maximum initial stress, respectively, and the more than 10 MPa stress inclination between them occurred in 60 cm thick and 2 m high concrete lining. (author)

  16. 40 CFR 1042.130 - Installation instructions for vessel manufacturers.

    Science.gov (United States)

    2010-07-01

    ...) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW AND IN-USE MARINE COMPRESSION-IGNITION ENGINES...-speed operation, tell vessel manufacturers not to install the engines in variable-speed applications or... vessel manufacturers. (a) If you sell an engine for someone else to install in a vessel, give the engine...

  17. 7 CFR 58.214 - General construction, repair and installation.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false General construction, repair and installation. 58.214... Service 1 Equipment and Utensils § 58.214 General construction, repair and installation. All equipment and utensils necessary to the manufacture of dry milk products, including pasteurizer, timing-pump or device...

  18. 14 CFR 171.9 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric... a power distribution system or locally generated, with a supplemental standby system, if needed. (c...

  19. Decommissioning of nuclear installations - regulations - financing - responsibility - insurance

    International Nuclear Information System (INIS)

    Hubert, E.H.; Andersson, C.; Deprimoz, J.; Mayoux, J.C.; Richard, M.; Sartorelli, C.; Nocera, F.

    1983-01-01

    This paper highlights three aspects of decommissioning of nuclear installations which relate, more or less directly, to legal options already applied or advocated. It reviews the regulatory conditions for decommissioning a nuclear installation and indicates legal provisions for financing decommissioning expenditures. It also describes the legal provisions to determine liabilities in case of nuclear damage and the assistance which insurers may provide to cover the consequences of such liabilities. (NEA) [fr

  20. Designing Software-Based Interactive Installations

    DEFF Research Database (Denmark)

    Andreasen, Troels; Juul, Niels Christian; Rosendahl, Mads

    2014-01-01

    of the installation using tools like sketching or storyboarding. The design involves a clarification of available and appropriate building blocks, as well as the linking of these blocks to provide an architectural framework comprising the intended external behavior. The construction phase takes a component...